Meeting was called to order at 6:00 PM by Chairman Price.
I. Approval of Minutes – Ms. Knight motioned to approve the July 7, 2026 minutes.
Mr. Baus seconded the motion. Motion carried 5-0.
Public Hearing
a. Mr. James Bigelow – Discussed issues regarding parking and lighting. He quoted the St
Paul’s representatives as saying that they wouldn’t turn Waring St into a parking lot.
They now have 20 parking spaces along Waring St. The lighting for the Campus has
intruded on the neighborhood even when the parking lot is empty. He felt that the best
solution for St Paul’s would be to buy a large parcel in the country where they could
create the expansive campus that they want.
b. Diane Frankenberger – regarding 321 S. Laurel Ave application. Central Ave is very
different from the other streets in the Historic District. There is a significant amount of
traffic on this street which creates a tremendous amount of noise. She understands why
the homeowner constructed the screen that they did and felt that a reasonable solution
would be to paint it black and allow it to stay until SCDOT resolved the truck traffic issue
on Central Ave.
c. Alex McIntosh – St Paul’s parishioner – They have not caused the growth; growth is
coming to them. They already have satellite parishes in other areas. They host many
outreach missions in the community. They are trying to prepare for the future given the
growth of their congregation.
d. Elise Richardson – Lights and increase traffic are her main concern.
e. Karyn Healy – Stormwater management is a concern for the St. Paul’s project. They are
already over the allowed impervious coverage and they want to add a large structure that
will only increase their stormwater issue. What is the effect that this will have on the
surrounding properties?
f. Jim Healy – The concern regarding St Paul’s is the impervious coverage and what is
happening during construction. How is the proposed basin going to control the release of
this detained water? What is the effect on the surrounding area?
g. Peter Gorman – Re:401 S. Magnolia St – Commended the workmanship that has been
done so far. The garage and addition design are very appropriate. Of the two proposed
garage locations, he preferred the rear yard location and felt that location was more
appropriate than the side yard location.
Old Business
1. 321 S Laurel St – Mary Jo Swanson presented the application. The applicant installed a
wooden screen to reduce the amount of noise from the traffic at the intersection of
Central Ave and S Laurel Ave. She proposed three (3) options. 1. Leave the existing
screen in place and paint it black. 2. Re-install the railing and install Bahama Shutters
that would be attached to it. 3. Install a shutter that is attached to the existing screen for
the full length of the screen without installing the railing. Of these three options the
applicant preferred options 1 and 3. The Board was receptive of the 2
nd and 3rd options.
Board deferred the decision with the anticipation that the applicant was to submit plans
for the full length Bahama Shutter with no railing to staff for review and approval.
New Business
2. 311 Sumter Ave - Mike Taylor presented the application. Applicant requested to
construct a dormer off the back of their client’s house. The proposed dormer addition is to
be 8” fiber cement siding. All trim and siding are to be white. Windows will be
simulated divided light windows with 6 over 6 grids to match the existing windows.
Roofing will match the existing raised seam metal roofing in color and material.
Mr. Baus thought the design was appropriate and motioned to approve the application.
Ms. Knight seconded the motion. Motion carried 5-0.
3. 108 Rutherford St – This application requested to enclose the rear portion of the
wraparound porch to create an addition in the back of the house. Materials used are to
match the existing materials – wood siding, brick piers, and simulated divided light 6
over 6 windows. The existing rear door and window will be re-used. All siding and trim
are to be the same color as the existing siding and trim. Mr. Price recommended saving
the original windows. It was agreed to use new simulated divided light windows on the
new construction and keep the 10 existing windows for the remainder of the house and
possibly renovate them over time.
Mr. Pye motioned to approve this application. Mr. Baus seconded the motion. Motion
passed 5-0.
4. 401 S. Magnolia St – Mr. Pye recused himself from this application. Ms. Rachel Reed
presented this application to build an addition in the rear corner of the house and to build
a detached two-car garage. The addition requires the demolition of an existing porch
addition that was previously enclosed.
There are two proposed locations for the proposed garage. The first location was in the
side yard between 401 and 405 S. Magnolia St. The setbacks were sufficient for this
location. The driveway entrance was off of S. Magnolia St and offset from the garage to
get around a large (30”+)Live Oak. The applicant felt that it allowed them to provide
access from the driveway to the front door. This location will require review by the Tree
Protection Board and approval from SCDOT for the new curb cut on Magnolia. The
applicant has been in touch with the Township Arborist and is scheduled next month to
appear before the TPB. They have also been in touch with SCDOT and they did not seem
to have an issue with the location of the driveway entrance.
The second location was in the rear yard with the driveway access off E 3
rd South St.
This location was located between two Live Oaks but was at the edge of both of their drip
lines. It was not as intrusive on the trees as the side yard location. The downside was
that it broke up the back yard.
Ms. Knight motioned to approve the demolition of the existing rear addition, the design
and construction of the proposed addition, and the design and construction of the
proposed garage in the side yard. Mr. Baus seconded the motion. Motion passed 4-0.
5. 111 Waring St. – St Paul’s Episcopal Church – Rector Tripp Jeffords and Eric Epstein,
Epstein Architecture presented the current plans. Rector Jeffords presented the current
need for the Church’s expansion. During the early 2000’s, the Church experienced rapid
growth that resulted in the construction of Doar Hall, the Youth and Learning Center, and
the Nursery and Fellowship Center. Part of this original master plan was the demolition
of Skardon Hall to create room for an adult education building, and a future church. The
latter phases did not happen. The Church is again rapidly growing with many outreach
programs that service community needs. These programs often meet during the day
during school hours and consequently require separate facilities. In addition, Trinity
Academy was added to the St. Paul’s community and is also in need for additional
facilities.
Mr. Epstein presented the proposed design. The site (about 1 acre) is off Waring St
between the current Youth and Learning Center and the cemetery. Skardon Hall currently
occupies the site and was built in 1974 using light wood frame construction on a cinder
block foundation. This construction limits its ability to be expanded. The current plan
follows the L shaped design of the original masterplan but has one building instead of
two. There is still a courtyard, but it is greatly reduced in size. The building is divided
into two wings. The left wing is the classroom wing for adult classrooms on the first floor
and classrooms for Trinity Academy on the second floor. The right wing is for the
gynatorium. A central hallway connects the two wings and leads from the Waring St
entrance to the courtyard area on the other side.
There are a variety of siding options on the proposed structure – lap siding, board and
batten, and louvers/shutters - all of which are on other campus structures. Natural wood
will be used to highlight prominent areas such as entrances. Brick will be used
predominantly as a paving element. The proposed roof is a red standing seam metal roof
that is indicative of the other roofs found on the campus.
Mr. Price asked about what grades the classrooms on the second floor served. Mr.
Epstein responded 5-8. There was no intention to go beyond the 8
th grade at this time. If
the need for high school level classrooms arose, then they would consider building off
campus as a separate facility. Mr. Pye asked about the size difference between what was
conceptually approved vs what is being proposed today. The proposed building is larger
than what was previously proposed, partly because of increased growth of the St. Paul’s
community. Mr. Pye and Mr. Price mentioned that their purview did not address lighting,
parking, and stormwater management. These issues will be resolved by others as they go
through the approvals process. Mr. Price mentioned that the lighting issues brought up by
the residents could be addressed regardless of what happens with this application.
Mr. Baus commented that the Waring St side was more abrupt and sheer than the campus
side of the building. It did not have the same scale as the other elements. The link
between the two wings was proposed to be wood looking Hardie Plank siding or wood
siding. Mr. Epstein said that they will continue to study this elevation, but it is stacked
classrooms so they may be limited in breaking it down more. Mr. Baus was thinking
about the residents across the street and thought that it was a bit “boxy’. Mr. Price
questioned about breaking down the other side of the Waring St entrance where the
gymnatorium is located and that they were hesitant to approve board and batten for
residential projects. Mr. Epstein responded that the treatment at the roofline and that the
proposed board and batten is more pronounced than typical board and batten to allow for
greater shadow play and create more interest. Mr. Pye and Mr. Battle also commented on
the Waring St elevation and that they thought that they should look at trying to break it up
more on the right side of the entrance. Mr. Epstein said that they will look at it.
Mr. Pye made a motion to conceptually approve the demolition of Skardon Hall and the
conceptual building design pending final building design approval. Mr. Baus seconded
the motion. Motion passed 5-0.
As there was no more business in front of the Board, Ms. Knight motioned to adjourn.
Mr. Baus seconded the motion. Motion carried 5-0. Meeting was adjourned at 7:52.