Design Review Board Minutes
April 23rd, 2026
Members Present:
Peter Irie (Vice Chair)
Chris Campeau (Chairman)
Bill Beauchene
Candace Pratt
Jared Condon
Justin Westbrook
Tammie Golden
I. Approval of March Meeting Minutes
1. N. Maple Street – Revisions to previously approved flex space building
2. 1320 N. Main Street – New construction of 7brew coffee shop
3. Lincoln Square – New construction of multi-family development
NEW BUSINESS:
1. 502 W. 5th North Street – New construction of accessory pavilion for ARK Foundation
The meeting was called to order at 4pm.
Chairman Campeau asked for consideration of the March meeting minutes. made a motion to approve the minutes; seconded the
motion. The motion passed unanimously.
Old Business
1. N. Maple Street – Ms. Pratt recused herself from this item. Mr. Karpus presented the changes to the previously approved
flex building. He noted that the design previously included a single, larger building, but had been revised to include two
smaller buildings. The board noted that they would like to see additional site landscaping, which could be achieved by
reducing sidewalk area and adding plantings around the base of the proposed buildings. The board also discussed the
potential of adding brackets or more residential details to soften the buildings architectural presentation. Mr. Beauchene
made a motion to approve the project with comments made. Chairman Campeau seconded the motion; the motion passed
unanimously.
2. 1320 N. Main Street- Mr. Boyer presented the updated proposal for preliminary review for a new 7brew location. The board
discussed the site and their concerns with the lack of Lowcountry plant choices within the landscaping plan, traffic
circulation and excess parking. Ms. Zimmerman offered to set a up a meeting to discuss the traffic circulation concerns
further with the Town’s Engineering department, noting that this project did not require a traffic impact analysis. The board
then discussed the updated architecture, noting that it was an improvement from the conceptual design. The board advised
that the applicant should restudy the flat canopy roof and attempt to give it a more residential feel, utilize brick rather than
“thin” brick, and study the use of Lowcountry residential details, (cornice, mansard roof, rafter tails, and brackets). Mr. Irie
made a motion to deny preliminary approval, as there were still outstanding concerns with the site design, but noted that
the architecture was moving in the right direction. Mr. Westbrook seconded the motion. The motion passed unanimously.
3. Lincoln Square – Mr. Hutchinson provided updates on the project from the conceptual review. The board and the applicant
discussed the layout of the property at length. The board requested that the applicant restudy the location of the pump
station. They also noted that the site plan should include the location of all utilities and associated screening of said items.
The board noted that refuse collection needed to be addressed, and if a dumpster enclosure were to be utilized instead of
rollouts, the location and design of the enclosure needed to be included and reviewed by the board. The board moved on to
2
discussion of the residences and their proposed architecture. The board requested that the applicant return with varying
color palette, study façade detail variation and the potential of front porches. The board also noted that additional trees
could provide streetscape variation, and to ensure that when they return that all pedestrian connections are depicted within
the site plan. Mr. Westbrook made a motion to grant preliminary approval with comments noted. Ms. Pratt seconded the
motion; the motion passed unanimously.
New Business
1. 502 W. 5th North Street – Mr. Brooker presented the proposal for the Leadership Dorchester Class of 2026 non-profit
project; a new pavilion structure for the ARK Foundation. The board discussed the architectural details with Mr. Brooker,
who confirmed that the pavilion would mimic the primary structure, which was originally a residence. Mr. Brooker explained
that there would be little impact to the site, and the most of the materials and labor would be donated. Mr. Beauchene
made a motion to approved the project as presented. Mr. Campeau seconded the motion; the motion passed unanimously.
ADJOURN:
There being no further business, the meeting was adjourned at 5:15pm
Respectfully Submitted, Date: ____5/27/26_____
Becca Zimmerman
Zoning Administrator