RecordWell Data

Agenda

Town of Seabrook Island · Charleston County · Agendas

Open the original document More from Town of Seabrook Island

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Town Council Regular Meeting February 24, 2026 – 2:30 PM Watch Live on YouTube S eabrook Island Town Hall, Council Chambers 2001 Seabrook Island Road Seabrook Island, SC 29455 AGENDA CALL TO ORDER, ROLL CALL, AND FOIA STATEMENT APPROVAL OF MINUTES January 27, 2026 Town Council Regular Meeting CITIZEN COMMENTS During the first citizen comment period, any citizen may speak pertaining to any item listed on the meeting agenda which does not require a public hearing. Each speaker shall be limited to three minutes in which to make his or her comments. Town council shall allow no more than 30 minutes for citizen comments. Preference shall be given to individuals who have signed up or otherwise notified the town clerk/treasurer of a desire to speak prior to the start of the meeting. REPORTS OF TOWN BOARDS COMMISSIONS, AND COMMITTEES Advisory Committees Environment & Wildlife Committee (Raymond Hamilton) P ublic Safety Committee (Darryl May) D iscretionary Grants Committee (Patrick Faulkner) • Recommendation to approve Program Guidelines for the Discretionary Grants Program (Action Item) C ommunity Facilities & Infrastructure (Thomas Hund) • Request to authorize the initiation of a procurement process to engage a consultant to conduct a space and facility needs assessment (Action Item) REPORTS OF TOWN OFFICERS AND STAFF Mayor’s Report S taff Reports Report of the Mayor • Charleston County Transportation Sales Tax Referendum • Ordinance 2026-01 R eport of the Town Administrator • Strategic Planning Workshop, March 10th – 10:00 am 1 Report of the Finance Director Report of the Planning Director Report of the Community Affairs Director CITIZEN COMMENTS During the second citizen comment period, any citizen may speak pertaining to any town matter, except personnel matters. Each speaker shall be limited to three minutes in which to make his or her comments. Town council shall allow no more than 30 minutes for citizen comments. Preference shall be given to individuals who have signed up or otherwise notified the town clerk/treasurer of a desire to speak prior to the start of the meeting. EXECUTIVE SESSION ITEMS Pursuant to SC Code § 30-4-70 (a)(2), Discussion of items incident to proposed contractual arrangements (Beach Patrol Services RFP) Please Note – Upon returning to open session, the Town Council may take action on items discussed in Executive Session. COUNCIL COMMENTS ADJOURNMENT 2 Town Council Regular Meeting January 27, 2026 – 2:30 PM View Meeting on YouTube Seabrook Is land Town Hall, Council Chambers 2001 Seabrook Island Road Seabrook Island, SC 29455 MINUTES CALL TO ORDER Mayor Kleinman called the meeting to order at 2:32 pm. ROLL CALL Council Members Present: Bruce Kleinman; Mayor, Patrick Faulkner, Thomas Hund, and Raymond Hamilton Town Staff Present: Joe Cronin (Town Administrator), Abby Grooms (Communications and Events Coordinator), Tyler Newman (Zoning Administrator), Amber Howard (Finance Director), and Peter Wiggins (Town Clerk). FOIA STATEMENT The Town Clerk confirmed that the meeting was advertised in compliance with the requirements of the South Carolina Freedom of Information Act. Agendas were posted and furnished to news media and all others requesting notification. ELECTION OF MAYOR PRO TEMPORE Mayor Kleinman motioned to nominate Darryl May as Mayor Pro- Tempore for a two-year term. Mayor Kleinman’s motion was APPROVED unanimously. OTHER ACTION ITEMS Shorebird Steward Program Mr. Hamilton motioned to approve the Town of Seabrook Island’s statement of support for the Shorebird Steward Program, seconded by Mr. Faulkner. Mr. Hamilton’s motion was APPROVED unanimously. APPROVAL OF MINUTES January 12, 2026 Mr. Faulkner motioned to approve the minutes of January 12, 2026, seconded by Mr. Hamilton. Mr. Faulkner’s motion was APPROVED unanimously. PUBLIC HEARING ITEMS 3 Ordinance 2025-11; An ordinance amending the Town Code for the Town of Seabrook Island, South Carolina; Chapter 2, Administration; Article VI, Financial Administration; Division 1, Generally; Section 2-608, Fund Balance Policy; so as to amend the town’s Fund Balance Policy Mayor Kleinman opened the Public Hearing on Ordinance 2025-11. Upon hearing there was no one present who wished to speak on Ordinance 2025-11, Mayor Kleinman closed the public hearing. REPORTS OF TOWN BOARDS, COMMISSIONS, AND COMMITTEES Environment & Wildlife Public Safety Discretiona ry Grants Community Fac ilities & Infrastructure Seabrook Island Utility Commission Mr. Hamilton stated the first committee meeting of 2026 is scheduled for February 5, at 10:00 am. He announced that Camp St. Christopher is having a Wildlife Workshop on February 3, at 6:00 pm. He stated that the workshop will have information on biodiversity and how humans can coexist with wildlife. Mr. Hamilton also announced that Jeff Davis of SIPOA had a great article in the January edition of “Currents” on how humans can coexist with coyotes. Mayor Kleinman sta ted he chaired a meeting of the Public Safety Committee in Mr. May’s absence. He stated the committee was advised on the upcoming Beach Patrol Services RFP. Mr. Faulkner st ated the committee met on January 21. He stated the committee discussed the powers and duties granted to the committee under the current ordinance. He added that the committee will be recommending the Conservation and Community Promotions Grant Programs be merged into one program. He also added the committee will be recommending the grant limit per applicant be raised to $5,000.00 from $2,500.00. He closed by stating the committee will be recommending the town enter into a Memorandum of Agreement with each applicant that lays out the terms and conditions of the applicant receiving grant funding. Mr. Hund stat ed the first committee meeting is scheduled for January 29. He stated there is work to do related to prioritizing the powers and duties of the committee. He stated the committee will be discussing the Seabrook Island Road project, as well as the need for a new town hall. He stated he also wanted the committee to discuss a vision for the committee that allows the members to be involved in other projects on the island such as the Seabrook Island Master Plan. 4 Mr. Ferland updated the council on SIUC’s finances for December 2025. Mr. Ferland s tated the Pond Project is complete. He stated the project consisted of approximately $12 million of work. He added the work on Pump Station #1 is complete. Mr. Hamilton ask ed if there is any major work planned for 2026. Mr. Ferland stated there is other work planned for two pump station rebuilds, as well as other regular maintenance planned for the coming year. REPORTS OF TOWN OFFICERS & STAFF Mayor Mr. Kleinman stated he wanted to address the Town’s efforts to acquire funding through the proposed Transportation Sales Tax (TST) for the Seabrook Island Road Project. He reminded residents that the council passed a resolution in 2025 that supported the Town pursuing funding through the TST program. He urged Seabrookers to submit public comments to Charleston County in support of the project. Mr. Kleinman closed by stating that residents, visitors, and business owners have been paying into the TST program and the Town has yet to receive funding for a project within its municipal limits. Mr. Kleinman re minded council that the Town has scheduled a strategic planning workshop for March 10. He continued by urging council to formulate their own list of priorities prior to the workshop so the meeting could be both more efficient and productive. Mr. Hamilton ask ed if the Town could submit an example form letter for residents to forward to Charleston County. Mac McQuillin, Town A ttorney, stated the Town could urge residents to voice their opinion in favor of a specific project. He continued by saying the Town should be cautious not to use public resources to influence the outcome of any potential referendum. Mr. Kleinman s tated he didn’t think that having residents submit a form letter was a great way to gather support for the road project. Mr. Kleinman stated he would work with the Town’s Communications and Events Coordinator to decide how best to gather support for the project. Mr. Kleinman closed by stating that nothing is better than word of mouth support. Mr. Hamilton st ated his idea was to compress the recent Pelican’s Brief email and compress it to three bullet points that could be submitted as public comments to Charleston County. 5 Town Administrator Finance Direc tor Zoning Administ rator Mr. Cronin stated the Town has issued a Request for Proposal for Beach Patrol Services. He continued by saying the proposal asked the bidder to submit proposals for April through September service as has been practiced in the past, but also includes a request to submit a cost for year-round service. He stated he had been contacted by three prospective bidders. He stated the Public Safety Committee will be the recommending body, and council will award the contract. Mr. Cronin sta ted that now the Seafields facility is complete, there needs to be a post-construction inspection of the right-of-way. The inspection will assess any damage to the right-of-way that is a result of the construction of the new facility. He stated the Town is using G. Robert George and Associates for the damage assessment/post- construction inspection. Ms. Howard ga ve an update on the Town’s financials as of December 31, 2025. Mr. Hamilton asked what percentage of the fund balances is interest. Ms. Howard stat ed in 2025, the Town received $475,000 in interest from the Local Government Investment Pool. Mr. Hamilton ask ed why the local accommodations tax payments received by the Town have increased, while the State Accommodations Tax payments have decreased. Mr. Cronin stat ed the local accommodations tax is a newer tax. He stated that the Town continues to see better compliance, and thus payments to the Town continue to increase relative to the growth/decline of State Accommodations Tax payments. Mr. Newman gave an update on Zoning and Code Enforcement activities since the December meeting. ORDINANCES FOR SECOND READING Ordinance 2025-11: An ordinance amending the Town Code for the Town of Seabrook Island, South Carolina; Chapter 2, Administration; Article VI, Financial Administration; Division 1, Generally; Section 2-608, Fund Balance Policy; so as to amend the fund balance policy Mr. Cronin gave a brief history of the ordinance to update Mr. Hund and Mr. Faulkner. Mr. Hund motioned t o pass Ordinance 2025-11 at second reading, seconded by Mr. Hamilton. Mr. Hund’s motion was APPROVED unanimously. 6 ADJOURNMENT There being no further business before the council, Mr. Kleinman declared the meeting adjourned at 3:34 pm. Peter D. Wigg ins II, MPA Town Clerk 7 TOWN OF SEABROOK ISLAND REQUEST FOR PROPOSALS (RFP) 2026-01 BEACH PATROL SERVICES [REVISION #1: JANUARY 20, 2026] The Town of Seabrook Island is inviting s ealed proposals from qualified contractors for all labor, equipment and materials to provide professional beach patrol services on the beaches of Seabrook Island. A copy of the RFP package, consisting of (1) General Terms and Conditions, (2) Special Terms and Conditions, (3) Scope of Services, (4) Form of Contract, (5) Insurance Requirements and (6) Non-Collusion Oath, may be obtained at the Seabrook Island Town Hall during normal business hours, or from the Town website at https://www.townofseabrookisland.org/bids--proposals.html. Except as otherwise specifically noted, the entire package must be used in preparing proposals. Issue Date: January 16, 2026 Solicitation Number: RFP 2026-01 Description of Services: The Town of Seabrook Island is inviting proposals from qualified firms to provide professional beach patrol services on the beaches of Seabrook Island Bid Security: Not Required Pre-Bid Conference: Not Required Due Date For Proposals: February 13, 2026, 2:00 PM Public Opening Date: February 13, 2026, 2:30 PM Public Opening Location: Seabrook Island Town Hall Town Council Chambers 2001 Seabrook Island Road Seabrook Island, SC 29455 8 RFP 2026-01 RFP Page 1 of 8 Town of Seabrook Island REQUEST FOR PROPOSALS GENERAL TERMS AND CONDITIONS 1. PREPARATION, SUBMISSION AND WITHDRAWAL OF PROPOSALS A. There is no standard form of proposal. Proposals must be typewritten or computer - generated using a word processor or similar program . The information contained in the proposal should include, but is not limited to: (i) the official name, mailing address, email address and telephone number of the individual, firm, or corporation under which the business is conducted, as well as all legal entities which will participate in the provision of goods or services (hereinafter “Bidder” or “Bidders”); (ii) the form of organization of the Bidder, whether individual, firm, partnership, corporation, joint venture or other legal entity; (iii) all affiliations, parent -subsidiary relationships and corporate identities , including the names of the principals of such legal entities, must be fully disclosed and explained; (iv) a straightforward, concise description of Bidder’s qualifications, current and prior experience , and ability to satisfy the requirements of this Request for Proposal s (hereinafter “RFP”), including, specifically, the Bidder’s ability to perform the services set forth in Attachment B of this RFP (hereinafter “Services”); (v) a description of the size of the firm, the location of the office(s) from which the Services are to be performed, and the number and qualification of the staff to be employed in performance of the Services. The description should identify the principal supervisor and management staff who will be assigned to the Services and indicate any special skills, education, training and experience that would be applicable to the Services; (vi) a description of the vehicles and equipment which will be used by the Bidder in providing the Services; (vii) an acknowledgement of receipt of the entire RFP Package; (viii) the price the Bidder will charge for performing the Services during the two (2) year initial term . The proposal must contain all pricing information relative to providing the goods and /or performing the Services described in the RFP. The all-inclusive price is to contain all direct and indirect costs , including all out -of-pocket expenses , for which reimbursement is anticipated . Any price increases beyond the two (2) 9 RFP 2026-01 RFP Page 2 of 8 Town of Seabrook Island year initial term shall be subject to approval by the Town of Seabrook Island (hereinafter “Town”); and (ix) A list of other related contracts performed in the last three (3) years similar to the proposed Services covered by this RFP. Indicate the date, the name and telephone number of the principal contact. All proposals must include the RFP solicitation number and must be signed by an official authorized to bind the Bidder. All Bidders must submit one paper copy and one digital copy (PDF format on a USB drive) of the proposal. B. Mailed or hand-delivered proposals must be submitted in a sealed envelope to the Town of Seabrook Island , Attn: Town Administrator, 2001 Seabrook Island Road, Seabrook Island, South Carolina 29455. Each sealed envelope containing a proposal shall be marked on the outside with the Bidders ’ complete name, address, and the solicitation number (“RFP 2026-01”). Failure to do so may result in premature opening of, or a failure to open, such proposal. C. Proposals must be received in the Office of the Town Administrator by 2:00 PM on February 13, 2026. Proposals received after this date and time are considered “Late Proposals.” “Late Proposals” will not be opened or considered. D. Proposals may be withdrawn by written request by the Bidder to the Town Administrator prior to the time set for the public opening of proposals. E. Bidders shall promptly notify the Town Administrator in writing as soon as possible, but not later than 2:00 pm on January 23, 2026 , of any ambiguity, inconsistency or error which they may discover upon examination of the RFP documents or the project premises and local conditions. F. Bidders requiring clarification or interpretation of the RFP documents shall make a written request to the Town Administrator no later than 2:00 PM on January 23, 2026. G. Any interpretation, correction or change to the RFP documents will be made and posted on the Town’s website as an addendum to the RFP. No addenda will be posted after 2:00 PM on January 30, 2026. H. No substitution s or amendments will be considered after the awarding of a contract except by contract amendment or change order. I. The Town seeks a single, qualified company to be responsible for the provision of the Services, although the Town reserves the option to award portions of the project to multiple bidders if such approach is deemed to be most advantageous to the Town . Therefore, any one proposal submitted by more than one company will be deemed to be a proposal for a joint venture between or among the companies unless the proposal clearly and unequivocally describes that only one firm proposes to act as principal and the 10 RFP 2026-01 RFP Page 3 of 8 Town of Seabrook Island other firm(s) contractual position is clearly defined. The companies submitting as a joint venture will be held jointly and severally responsible for the entire project and will not be permitted to limit their liability to the Town. K. The following attachments are included in the RFP Package: (i) Attachment A: Special Instructions/Terms and Conditions (ii) Attachment B: Scope of Services/Specifications (iii) Attachment C: Sample Contract (iv) Attachment D: Insurance Requirements (v) Attachment E: Non-Collusion Oath 2. NON-COLLUSION OATH Every proposal must be accompanied by a notarized affidavit of non -collusion, executed by the Bidder or, in the case of a corporation, by a duly authorized representative of said corporation. The Non-Collusion Oath is provided in Attachment E of this RFP. 3. BIDDER REPRESENTATIONS By submitting a proposal, each Bidder represents that: A. The Bidder has read and understands this RFP (including all specifications and attachments) and that its proposal is made in accordance therewith. B. The Bidder has reviewed the RFP, has become familiar with the local conditions under which the Services are to be performed, and has correlated personal observations with the requirements of the proposed contract documents. C. The proposal is based o n the terms, materials, and equipment required by this RFP, without exception. D. The Bidder is qualified to provide the Services and, if awarded the contract, will do so in a professional, timely manner using Bidder's best skill and attention. E. If Bidder is awarded the contract, it will execute the formal contract called for herein. F If Bidder is awarded the contract, Bidder agrees that: (i) it will provide the insurance coverage as requir ed in Attachment D, Insurance Requirements, and (ii) if the Services or any part thereof are not completed within the required time period, the Bidder will be liable for all damages in accordance with 11 RFP 2026-01 RFP Page 4 of 8 Town of Seabrook Island the terms of the formal contract. G. Bidder’s staff is knowledgeable about and experienced in performing the Services required in this RFP, and the Bidder warrants that it will use its best skill and attention to provide the Services in a professional and timely manner. 4. BIDDER'S QUALIFICATIONS Before a proposal is considered for award, the Bidder may be requested by the Town to submit a statement providing additional information regarding their previous experience in performing comparable Services. 5. EVALUATION CRITERIA Bidders meeting the minimum requirements set forth in this RFP will have their proposal evaluated and scored using the evaluation criteria stated below. Bidders may be required to provide oral presentations to the Town’s Public Safety Committee, who shall serve as the Evaluation Committee for this RFP. The Public Safety Committee meeting is tentatively scheduled for February 17, 2026, at 10:00 AM. Qualifications & Experience 30 Points Project Approach 20 Poins License & Training Requirements 10 Points Resources & Financial Ability 10 Points Cost Proposal 30 Points TOTAL 100 Points 6. AWARD OF CONTRACT A. Award of the contract will be made consistent with the criteria in the Town’s applicable ordinance, to the lowest responsive and responsible Bidder(s) whose proposal, conforming to the RFP, is deemed most advantageous to the Town, price and other factors considered. B. The Town reserves the right to (1) reject any or all proposals and any part of a proposal; (2) waive informalities, technical defects, and minor irregularities in proposals received not involving price ; (3) interview Bidders prior to selecting a successful Bidder; and (4) award the proposal(s) received on the basis of individual items or groups of items or the entire list of items. 7. NOTICE OF AWARD OF CONTRACT The successful Bidder will be notified of acceptance of proposal by a wr itten notice of award (hereinafter, “Notice of Award”) of the contract. The successful Bidder shall not undertake any Services, and the Town will not be responsible for payment for any Services whatsoever undertaken by successful Bidder prior to issuance of the notice to proceed (hereinafter, “Notice to Proceed”.) 12 RFP 2026-01 RFP Page 5 of 8 Town of Seabrook Island The successful Bidder shall be required to submit acceptable insurance certificat e(s) and endorsement(s) within five (5) business days after the issuance of the Notice of Award. 8. CONTRACT DOCUMENT The successful Bidder shall be required to execute a formal contract (the “ Contract”) within five (5) business days after issuance of a Notice of Award , unless extended by mutual consent . It is anticipated that the Contract shall be virtually identical in substance and form to the Sample Contract which is attached hereto as Attachment C (Sample Contract ). The only anticipated changes from Attachment C (Sample Contract) will be to include additional exhibits, to fill in the blanks to identify the successful Bidder, and terms relating to compensation, or to revise the contract to accommodate corrections, changes in the scope of Services, or changes pursuant to addenda issued prior to the public opening. Bidders should raise any questions regarding the terms of the Contract or submit the specific language of any requested change to the terms and conditions of the Contract , together with their submitted proposal. Because the signed contract will be substantively and substantially derived from Attachment C (Sample Contract), Bidder is urged to seek independent legal counsel as to any questions about the terms, conditions or provisions contained in Attachment C (Sample Contract ), before submitting a proposal. Again, Attachment C (Sample Contract ), contains important legal provisions and is considered part and parcel of this RFP. Failure or refusal to sign aforesaid Contract shall be grounds for the Town to revoke any Notice of Award which has been issued, forfeit bid security, and award the Contract to another Bidder. If Bidder generally uses a n industry standard form of contract, in lieu of submitting requested changes to the Contract, a copy of the industry standard form of contract proposed by the Bidder may be submitted along with the Bidder’s Proposal. Any requested changes to the Contract language may affect the Town’s consideration of the proposal. The Town will be the sole judge as to whether to accept any changes to the terms and conditions of the Contract, or whether to accept an alternative form of contract. No changes to the Contract will be considered after the proposal has been accepted. 9. NOTICE TO PROCEED A Notice to Proceed will be issued after the successful Bidder has executed the Contract and has submitted acceptable performance and payment bonds (if applicable) to the Town as well as other submittals specified herein and in the Contract which are required to be delivered before the Notice to Proceed is issued. The successful Bidder shall not deliver any equipment to the work site or commence work until the successful Bidder has received a written Notice to Proceed from the Town Administrator. 10. STATE AND LOCAL TAXES Except as otherwise specifically provided for in the Contract, Contract prices shall include all state 13 RFP 2026-01 RFP Page 6 of 8 Town of Seabrook Island and local taxes applicable to the Services provided. The successful Bidder shall calculate, if applicable, that portion of the Contract which is subject to the South Carolina sales and/or use tax, which amount shall be itemized and shown on all invoices and shall be paid to South Carolina Department of Revenue (SCDOR) by the successful Bidder. If the successful Bidder is a non-South Carolina company, the Town will withhold said amount from all invoices and remit payment to the SCDOR, unless successful Bidder furnishes Town with a valid South Carolina Use Tax Registration Certificate Number. The successful Bidder shall indemnify and hold harmless the Town for any loss, cost, or expense incurred by, levied upon or billed to the Town as a result of the successful Bidder’s failure to pay any tax of any type due in connection with this Contract. The successful Bidder shall ensure that the above sections are included in all subcontracts and sub-subcontracts and shall ensure withholding on out of state sub and sub -subcontractors to which withholding is applicable. 11. PERMITS AND LICENSES The successful Bidder, and any subcontractor, shall, without additional expense to the Town, be responsible for obtaining and maintaining all necessary licenses and permits required by the State of South Carolina or the Town or any other authority having j urisdiction over the Services. Prior to execution of a contract, the successful Bidder and subcontractor may be required to provide a copy of its current applicable Contractor’s Licenses issued by the State of South Carolina and the Town. 12. SUBCONTRACTORS A. If any subcontractors will be used for this project, the successful Bidder shall provide to the Town Administrator a list of names of any of the intended subcontractors, the subcontractor's applicable license number(s), and a description of the Services to be done by each subcontractor. B. The successful Bidder shall not substitute other subcontractors without the written consent of the Town Administrator. C. The successful Bidder shall be responsible for all services performed by a subcontractor as though they had been performed by the successful Bidder. Responsibilities include, but are not limited to, compliance with any applicable licensing regulations. D. If at any time the Town Administrator determines that any subcontractor is incompetent or undesirable, he or she shall notify the successful Bidder accordingly, and the successful Bidder shall take immediate steps for cancellation of the subcontract and replacement of the subcontractor. E. Nothing contained in any subcontract resulting from this RFP shall create any contractual relationship between any subcontractor of the successful Bidder and the Town. 14 RFP 2026-01 RFP Page 7 of 8 Town of Seabrook Island F. It shall be the successful Bidder’s responsibility to ensure that all terms required in the attached Contract are incorporated into all subcontracts. 13. INSURANCE REQUIREMENTS The successful Bidder, at its own expense, shall at all times during the term of the Contract, maintain insurance as r equired in Attachment D (Insurance Requirements), which is attached hereto and incorporated by reference. The Town shall not execute the Contract until the successful Bidder has submitted acceptable Insurance certificate(s) and endorsement(s) , which must be submitted within five (5) business days of receipt of the Notice of Award, unless extended by mutual consent, and which reflect that the required coverages are in place and that all premiums have been paid. Refusal or failure to submit such insurance certificat e(s) and endorsement(s) shall constitute grounds for the Town to revoke its Notice of Award, forfeit bid security, and award the Contract to another Bidder. The Town may contact the successful Bidder’s insurer(s) or insurer(s)' agent(s) directly at any time regarding the successful Bidder’s coverages, coverage amounts, or other such relevant and r easonable issues related to the Contract. The successful Bidder shall also require any sub-contractors to carry the same coverages in the same amounts. Faxed Insurance certificate(s) and endorsement(s) will be accepted if received no later than the time of contract execution and the original documents are received within one (1) business day after receipt of the fax transmittals. The Town must be advised immediately of any lapses or changes in required coverage. 14. INDEMNIFICATION Except for expenses or liabilities arising from the negligence or intentional acts of the Town, the successful Bidder shall expressly agree to indemnify, defend and hold the Town harmless against any and all expenses and liabilities arising out of the performance or default hereunder as follows: The successful Bidder shall expressly agree that to the extent that there is a causal relationship between its negligence, action or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation directly or indi rectly employed by the successful Bidder and any damage, liability, injury, loss or expense (whether in connection with bodily injury or death or property damage) that is suffered by the Town and/or its officers or employees or by any member of the public, to indemnify, defend and save the Town and its officers and employees harmless from and against any and all liabilities, penalties, demands, claims, lawsuits, losses, damages, costs, and expenses arising directly or indirectly out of the performance of the Contract to be entered into by the parties. Such costs are to include, without limitation, defense, settlement and reasonable attorney’s fees incurred by the Town and its employees. This obligation to indemnify shall include, without limitation, bodily injuries or death occurring to the successful Bidder’s employees and any person, directly or indirectly employed by the Successful Bidder (including, without limitation, any employee of any subcontractor), the Town’s officers or employees, the employees of any other independent contractors, or occurring to any member of the public. When the Town submits notice, the successful Bidder shall promptly defend any aforementioned claim, demand or lawsuit. This obligation shall survive the suspension or termination of the Contract resulting from this RFP. The limits of insurance required in such 15 RFP 2026-01 RFP Page 8 of 8 Town of Seabrook Island Contract shall not limit the successful Bidder’s obligation of indemnification. The recovery of costs and fees all extend to those incurred in the enforcement of this indemnity. 15. MATERIALS AND WORKMANSHIP If equipment, materials and supplies are to be included as part of the Services provided, all equipment, materials and s upplies incorporated in the Services and covered by the RFP and provided by the successful Bidder are to be of the most suitable grade for the purposes intended. When requested, the successful Bidder shall furnish the Town for approval the name of the manufacturer, the model number and other identifying data and information respecting the performance, capacity and rating of the machinery and other mechanical equipm ent which is incorporated in the Services. Machinery, equipment and materials installed and / or used without the Town’s prior approval shall be at risk of rejection. 16. COMPETITIVE BIDDING & BID SECURITY Purchases and/or contracts exceeding $5,000 shall be made in accordance with the competitive bidding procedures set forth in the Town’s ordinances, including the requirements for bid security. Bid security may be waived provided notice of such is given by the Town when bids are solicited. 17. PUBLIC ACCESS TO PROCUREMENT INFORMATION Subject to the requirements of the Freedom of Information Act, commercial or financial information obtained in response to this RFP that is deemed privileged and confidential by the Bidder and is so marked in a conspicuous manner will not be disclosed. It is therefore the responsibility of each Bidder to mark as “CONFIDENTIAL” each specific part of the proposal that it considers to be proprietary and confidential. 18. NON-DISCRIMINATION The successful Bidder shall not discriminate against any individual based upon age, sex, race, color, national origin, religion, genetic information, military/veteran status, or disability. 19. DRUG FREE WORKPLACE The successful Bidder shall comply with the South Carolina Drug-Free Workplace Act, Section 44- 107-10 et. seq., South Carolina Code of Laws, as amended. 20. INCORPORATION BY REFERENCE The contents of this RFP, and any addenda, will become part of the Contract for the Services. 16 RFP 2026-01 RFP Attachment A: Page 1 of 1 Town of Seabrook Island ATTACHMENT A SPECIAL INSTRUCTIONS/ TERMS AND CONDITIONS 1. PRE-BID CONFERENCE: A pre-bid conference is not required. 2. SUBMITTAL DEADLINE: Proposals will be received until 2:00 PM, on February 13, 2026 (as indicated on the official clock in the office of the Town Administrator ) after which time all proposals will be publicly open ed and read at the date and time specified in the RFP. Bidders are invited, but are not required, to attend the public opening. 3. ADDITIONAL INFORMATION, INQUIRIES & ADDENDA Questions or clarifications concerning this RFP should only be directed to: Joseph Cronin Town Administrator Town of Seabrook Island 2001 Seabrook Island Road Seabrook Island, SC 29455 Phone: (843) 768-9121 Email: jcronin@townofseabrookisland.org The deadline for the submittal of questions or requests for clarification is 2:00 PM on January 23, 2026. Any interpretation, correction or change of the RFP documents will be made and posted on the Town’s website (https://www.townofseabrookisland.org/bids--proposals.html) as an addendum to the RFP. No addenda will be posted after 2:00 PM on January 30, 2026. 4. TERM OF AGREEMENT A two (2) year initial term with up to five (5) one-year renewal options is contemplated, subject to an annual review, the satisfactory negotiation of terms and pricing (including, if applicable, any amendments to the days and hours the Services are provided and pricing acceptable to the Town), and the annual appropriation of funds by the Town Council. 17 RFP 2026-01 RFP Attachment B – Page 1 of 5 Town of Seabrook Island ATTACHMENT B SCOPE OF SERVICES SERVICES: The Town of Seabrook Island is inviting proposals from qualified firms to provide for the safety of residents and visitors in need of assistances on all beaches within the Town. In connection therewith, the required Services shall include the following: 1. Render assistance to those in need including, but not limited to: first aid assistance; water rescue; swim assistance; boat assistance; treatment of minor injuries (including stings); reuniting lost persons; and responding to inquiries or requests for information from the public; 2. When necessary, c all for assistance from appropriate public safety agencies (e.g., law enforcement, emergency management services, fire department, U.S. Coast Guard, etc.), and report any observed illegal or dangerous activities to the appropriate authorities in a timely manner; 3. Enforce the Town’s Beachfront Management Ordinances ( as specified in Chapter 32, Article II, of the Town Code for the Town of Seabrook Island), as well as any other restrictions or regulations lawfully imposed by the Town on users of the beach. To provide for this service, one or more of the Contractor’s employees shall be designated by the Town Council as Code Enforcement Officers of the Town . Such employee (s) shall be responsible for informing beachgoers not observing the Town’s ordinance s of their responsibility to do so, and for the issuance of citations in appropriate c ircumstances. Employees shall issue citations for violation of the Town’s beach ordinance, consistent with the policies adopted by the Town and communicated to the Contractor from time to time. At least one code enforcement officer shall be present on the beach whenever beach patrol personnel are present. When necessary, employees may be required to appear and provide testimony in Municipal Court. 4. To remove, or assist with the removal of, litter, equipment and debris on the beach; 5. To report, or assist with reporting of, injured wildlife to appropriate state agencies and/or non-profit organizations; 6. Provide all Services in a courteous and professional manner; and 7. Provide weekly activity logs to the Town in an agreed upon format. Significant events shall be reported both to the Town Administrator and Mayor as promptly as is reasonably possible. GENERAL REQUIREMENTS. The Services provided by the Contractor and its employees shall conform to the following general requirements: 1. UNIFORMS: All employees shall wear matching uniforms approved by the Town. Uniforms shall display the Town logo. All employees shall maintain a professional 18 RFP 2026-01 RFP Attachment B – Page 2 of 5 Town of Seabrook Island appearance at all times . The Contractor shall remove any employee deemed inappropriate by the Town. 2. QUALIFICATIONS & TRAINING: a. The Contractor shall maintain the minimum requirements for open water beach patrol and lifeguard agencies in accordance with nationally accepted standards set forth by the United States Lifesaving Association; b. The Contractor’s employees shall possess the physical and mental ability to adequately and professionally perform the Services. c. Each employee involved in providing the Services shall possess and maintain the following: i. USLA open water lifeguard certification; ii. CPR/AED certification; iii. first aid training consistent with United States Life Savings Association Guidelines; iv. a valid South Carolina driver’s license; v. background checks performed by the Contractor; and vi. code enforcement training provided by the Town. d. All employees shall be adequately trained in water rescue. e. The Town shall conduct code enforcement training both on an annual basis and for all new employees. The Contractor shall arrange for all employees to attend code enforcement training to become familiar with the Town’s beach ordinance s. New employees must be trained on the beach ordinances before being assigned to Services. f. Copies of employee records/certifications must be on file with the Town Administrator prior to employee assignment. g. Supervisors will be identified to the Town in advance and must be present during each employee shift. 3. EQUIPMENT: a. The Contractor shall provide all necessary safety, rescue and medical equipment to provide the Services. The safety equipment must include, but is not limited to: rescue cans, first aid kits, whistles and binoculars. At least one automatic external defibrillator (AED) will be supplied by the Town and shall remain on the beach any time employees are present. The Contractor shall inspect the AED weekly for serviceability. The Contractor may supply its own AED(s) in lieu of using the AED provided by the Town; provided the AED(s) are of equal or higher quality, and subject to prior approval by the Town Administrator. 19 RFP 2026-01 RFP Attachment B – Page 3 of 5 Town of Seabrook Island b. Contractor’s employees shall patrol the beach by driving Contractor owned vehicles approved by the Town Administrator. Vehicles shall be equipped with four -wheel drive and capable of carrying the necessary equipment. Vehicles shall have the ability to transport medical emergencies with the aid of a backboard via the bed of the vehicle. All vehicles shall have identifying decals, including a Town Logo, which is easily visible to beach goers. c. The Contractor’s employees shall have the ability to patrol and respond to water emergencies by operating a Contractor owned and maintained watercraft equipped with equipment for water rescue. d. The Town will supply the Contractor’s employees with 800 mHz portable radios to allow communication with the Town and other agencies . The Contractor will be responsible for the cost of any damage to the radios caused by abuse or misuse by the Contractor’s employees. WORK SITE: The Services shall be provided on the Town’s beach es, dunes, and waterways, which for purposes of this RFP are defined as follows: 1. ATLANTIC OCEAN: That area lying between the high-tide line and the low-tide line of the Atlantic Ocean and extending one mile seaward of the low-tide line of the Atlantic Ocean. 2. NORTH EDISTO RIVER: That area lying between the high-water mark and the low-water mark of the North Edisto River. 3. CAPTAIN SAMS INLET: That area lying between the high-water mark of Captain Sams Inlet to the point equidistant from the high -water mark of each strand on both sides of the inlet (ie. halfway between the high-water mark on the Seabrook Island side and the high-water mark on the Kiawah Island side). 4. EXCLUSIONS: For the avoidance of doubt, the Services shall not exclude calls for assistance in other navigable waterways surrounding the Town. DAYS & HOURS OF SERVICE: As part of this RFP, the Town is requesting pricing for two (2) service alternatives. Responsive Bidders must provide pricing for both alternatives. The alternative selected by the Town will be at the sole discretion of the Mayor and Council at the time of contract award. 1. ALTERNATIVE #1: PEAK SEASON SERVICE ONLY a. Early Season • Dates: April 1 through the Thursday preceding Memorial Day • Shifts Per Day: 1 • Daily Staffing: o Vehicles: 2 o Personnel: 2 (1 Per Vehicle) 20 RFP 2026-01 RFP Attachment B – Page 4 of 5 Town of Seabrook Island o On-Beach (Start Time): 9:30 AM o Off-Beach (End Time): 4:30 PM o Total Coverage: 7 Hours b. Mid-Season • Dates: Friday preceding Memorial Day through the second Sunday in August • Shifts Per Day: 2 (AM & PM), with scheduled overlap • Shift #1 (AM): o Vehicles: 2 o Personnel: 2 (1 Per Vehicle) o On-Beach (Start Time): 8:30 AM o Off-Beach (End Time): 3:30 PM o Total Coverage: 7 Hours • Shift Overlap: o Vehicles: 2 o Personnel: 4 (2 Per Vehicle) o Overlap (Start Time): 12:30 AMPM o Overlap (End Time): 3:30 PM o Total Overlap: 3 Hours • Shift #2 (PM): o # Vehicles: 2 o # Personnel: 2 (1 Per Vehicle) o On-Beach (Start Time): 12:30 PM o Off-Beach (End Time): 7:30 PM o Total Coverage: 7 Hours c. Late Season • Dates: Monday following the second Sunday in August through Labor Day September 30 • Shifts Per Day: 1 • Daily Staffing: o Vehicles: 2 o Personnel: 2 (1 Per Vehicle) o On-Beach (Start Time): 9:30 AM o Off-Beach (End Time): 4:30 PM o Total Coverage: 7 Hours 2. ALTERNATIVE #2: YEAR-ROUND SERVICE a. Early Season • Dates: April 1 through the Thursday preceding Memorial Day • Staffing and hours identical to Alternative #1, Early Season b. Mid-Season • Dates: Friday preceding Memorial Day through the second Sunday in August • Staffing and hours identical to Alternative #1, Mid-Season 21 RFP 2026-01 RFP Attachment B – Page 5 of 5 Town of Seabrook Island c. Late Season • Dates: Monday following the second Sunday in August through Labor Day September 30 • Staffing and hours identical to Alternative #1, Late Season a. Off-Season • Dates: Tuesday following Labor Day through April 1 October 1 through March 31 • Shifts Per Day: 1 • Daily Staffing: o Vehicles: 1 o Personnel: 1 o On-Beach (Start Time): 9:30 AM o Off-Beach (End Time): 4:30 PM o Total Coverage: 7 Hours 22 RFP 2026-01 RFP Attachment C – Page 1 of 13 Town of Seabrook Island ATTACHMENT C FORM OF CONTRACT STATE OF SOUTH CAROLINA ) CONTRACT ) TOWN OF SEABROOK ISLAND ) BEACH PATROL SERVICES THIS CONTRACT (hereinafter the “ Contract”) is made and entered into this _____ day of ____________________, 20__, by and b etween the TOWN OF SEABROOK ISLAND , South Carolina, a public body corporate and politic and political subdivision of the State of South Carolina, (hereinafter the "Town") and ____________________ [NAME OF COMPANY/INDIVIDUAL ], a ______ [ State Name ] ____________________ [ Sole Proprietorship/Partnership/Corporation, Limited Liability Corporation (choose one)], the address of which is ____________________ [Street, City, State, Zip ] (hereinafter the "Contractor"), (“Party” as to each; collectively the “Parties”). W I T N E S S E T H: WHEREAS, the Town wishes to contract for beach patrol services (“ Services”) more specifically described in Exhibit C: Scope of Services; and WHEREAS, the Contractor has represented to the Town that its staff is qualified to provide the Services required, and to perform this Contract in a professional and timely manner; and WHEREAS, the Town has relied upon the above representations by Contractor; NOW, THEREFORE, for and in consideration of these promises, of the mutual covenants herein set forth, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged, and the above-referenced recitals incorporated into this Contract herein by reference, the Parties hereto hereby agree as follows: SECTION 1. Contract Documents The Parties agree that the term “Contract Documents” shall include the following, which are attached hereto and incorporated herein by reference as if set out in full: Exhibit A: Request for Proposals (RFP) No. 2026-01 Exhibit B: RFP No. 2026-01 – General Terms and Conditions Exhibit C: RFP No. 2026-01 – Scope of Services Exhibit D: RFP No. 2026-01 – Insurance Requirements Exhibit E: Contractor’s Insurance certificate(s) and endorsement(s) SECTION 2. Performance of Services The Contractor agrees to perform and furnish all labor, supervision, materials, equipment, 23 RFP 2026-01 RFP Attachment C – Page 2 of 13 Town of Seabrook Island transportation and supplies necessary for the completion of the Services required under this Contract in a professional, timely manner, in accord with all applicable laws, rules and regulations. The Contractor shall provide the Services as specified in the Notice to Proceed, but not before said notice is issued. Coordination of the Services and administration of this Contract on behalf of the Town shall be by the Town Administrator. SECTION 3. Contract Price: Payment Terms The Town agrees to pay ____________________dollars ($__________) (hereinafter “ Contract Price”) to the Contractor for the Contractor’s performance of the Services described in this Contract, plus all reasonable expenses, pre-approved in writing by the Town Administrator, necessary to accomplish and complete the Services, in accordance with all terms and conditions as stated herein. The Contract Price shall be paid in monthly installments, as follows: [IF ALTERNATIVE #1 – PEAK SEASON SERVICE ONLY IS SELECTED] Installment # Dates Covered (Installment Period) Payment Amount 1 April 1 – April 30 $__________ 2 May 1 – May 31 $__________ 3 June 1 – June 30 $__________ 4 July 1 – July 31 $__________ 5 August 1 – August 30 $__________ 6 September 1 – September 30 $__________ TOTAL $__________ [IF ALTERNATIVE #2 – YEAR-ROUND SERVICE IS SELECTED] Installment # Dates Covered (Installment Period) Payment Amount 1 April 1 – April 30 $__________ 2 May 1 – May 31 $__________ 3 June 1 – June 30 $__________ 4 July 1 – July 31 $__________ 5 August 1 – August 30 $__________ 6 September 1 – September 30 $__________ 7 October 1 – October 31 $__________ 8 November 1 – November 30 $__________ 9 December 1 – December 31 $__________ 10 January 1 – January 31 $__________ 11 February 1 – February 28 $__________ 12 March 1 – March 31 $__________ TOTAL $__________ The Contractor shall invoice the Town for each Payment Amount within five (5) business days following the closing date of each Installment Period. In no event shall the aggregate total of the invoices for Services so submitted exceed the Contract Price. 24 RFP 2026-01 RFP Attachment C – Page 3 of 13 Town of Seabrook Island SECTION 4. Term of Contract; Time and Dates of Performance The initial term of the Contract shall be for a period of two years, beginning on April 1, 2026, and ending on March 31, 2028 (“Initial Term”). During the Initial Term, the Contractor shall perform the Services on the dates and times and with the personnel and vehicles as follows: [IF ALTERNATIVE #1 – PEAK SEASON SERVICE ONLY IS SELECTED] Hours of Operation & Staffing Levels Dates of Coverage* Shifts Per Day Hours & Staffing Early Season April 1 through the Thursday preceding Memorial Day 1 Daily Staffing - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 9:30 AM - Off-Beach (End Time): 4:30 PM - Total Coverage: 7 Hours Mid-Season Friday preceding Memorial Day through the second Sunday in August 2 Shift #1 (AM) - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 8:30 AM - Off-Beach (End Time): 3:30 PM - Total Coverage: 7 Hours Shift Overlap - Vehicles: 2 - Personnel: 4 (2 Per Vehicle) - Overlap (Start Time): 12:30 PM - Overlap (End Time): 3:30 PM - Total Overlap: 3 Hours Shift #2 (PM) - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 12:30 PM - Off-Beach (End Time): 7:30 PM - Total Coverage: 7 Hours Late Season Monday following the second Sunday in August through Labor Day September 30 1 Daily Staffing - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 9:30 AM - Off-Beach (End Time): 4:30 PM - Total Coverage: 7 Hours [IF ALTERNATIVE #2 – YEAR-ROUND SERVICE IS SELECTED] Hours of Operation & Staffing Levels 25 RFP 2026-01 RFP Attachment C – Page 4 of 13 Town of Seabrook Island Dates of Coverage* Shifts Per Day Hours & Staffing Early Season April 1 through the Thursday preceding Memorial Day 1 Daily Staffing - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 9:30 AM - Off-Beach (End Time): 4:30 PM - Total Coverage: 7 Hours Mid-Season Friday preceding Memorial Day through the second Sunday in August 2 Shift #1 (AM) - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 8:30 AM - Off-Beach (End Time): 3:30 PM - Total Coverage: 7 Hours Shift Overlap - Vehicles: 2 - Personnel: 4 (2 Per Vehicle) - Overlap (Start Time): 12:30 PM - Overlap (End Time): 3:30 PM - Total Overlap: 3 Hours Shift #2 (PM) - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 12:30 PM - Off-Beach (End Time): 7:30 PM - Total Coverage: 7 Hours Late Season Monday following the second Sunday in August through Labor Day September 30 1 Daily Staffing - Vehicles: 2 - Personnel: 2 (1 Per Vehicle) - On-Beach (Start Time): 9:30 AM - Off-Beach (End Time): 4:30 PM - Total Coverage: 7 Hours Off-Season Tuesday following Labor Day through April 1 October 1 through March 31 1 Daily Staffing - Vehicles: 1 - Personnel: 1 - On-Beach (Start Time): 9:30 AM - Off-Beach (End Time): 4:30 PM - Total Coverage: 7 Hours Upon reasonable notice to the Contractor during the Initial Term (or any extension thereof) the Town may request additional Services on dates other than those specified above. In such event, the Contractor shall use reasonable efforts to accommodate the Town’s request at a cost approximately proportional to the Contract Price. Any changes in the Contract Price, dates of coverage and hours of coverage shall be agreed to in writing by both Parties and attached hereto as an addendum. The Town reserves the right to renew this Contract for up to five (5) additional one-year periods if it determines renewal to be in its best interest ; provided, in no event shall the total term of this 26 RFP 2026-01 RFP Attachment C – Page 5 of 13 Town of Seabrook Island Contract, including both the Initial Term and annual renewals, exceed a total of seven (7) years. After the Initial Term, any request by the Contractor for a price increase for subsequent renewal periods must be made in writing at least ninety (90) days prior to the anniversary date of the Contract, or sooner if so requested by the Town. Any request for a price increase will be evaluated by the Town prior to exercising its right to renew. The Town will be the sole judge as to whether any price increase will be approved. If the Town exercises its right of renewal, any changes to the dates of coverage, hours of operation and Contract Price shall be agreed to in writing as an addendum to this Contract. The Contractor expressly acknowledges that time is of the essence in completion of this Contract and that the time limits and dates herein are critical components of the Contract. The Contractor warrants and represents that it has taken these facts into c onsideration and has determined that it can complete the Services within these time limits, including time for likely delays caused by weather or from other sources. The Contractor will not be compensated for any delays beyond the time set forth herein. The Contractor's only remedy for delays may be an extension of time to perform the Services. Due consideration will be given to claims for an extension of time due to extraordinary circumstances only. SECTION 5. Insurance Requirements The Contractor, at its own expense, shall at all times during the term of the Contract, maintain insurance which meets all of the requirements set forth in Exhibit D: Insurance Requirements, and as included in Exhibit E : Insurance Certificate(s) and Endorsement(s) , which are attached hereto and incorporated by reference. The Town may contact the Contractor’s insurer(s) or insurer(s)' agent(s) directly at any time regarding the Contractor’s coverages, coverage amounts, or other such relevant and reasonable issues related to this Contract. The Contractor shall also require any subcontractors to carry the same coverages in the same amounts. The Town must be advised immediately of any lapse changes in required coverages. SECTION 6. Compliance with Legal Requirements All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities (including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency of the provision of Services. The Contractor shall be responsible for compliance with any such law, ordinance, rule or regulation, and shall hold the Town harmless and indemnify same in the event of non- compliance as set forth in the Contract. By signing a bid, the Contractor certifies that it will comply with the applicable requirements of Title 8, Chapter 14 of South Carolina Code of Laws, 1976, as amended, and agrees to provide to the State upon request any documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable to the Contractor and its subcontractors or sub -subcontractors; or (b) that the Contractor and its subcontractors or sub-subcontractors are in compliance with Title 8, Chapter 14. The Contractor agrees to include in any contracts with subcontractors, language requiring subcontractors to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its contracts with the subcontractors language requiring the sub -subcontractors to comply with the applicable requirements of Title 8, Chapter 14. 27 RFP 2026-01 RFP Attachment C – Page 6 of 13 Town of Seabrook Island The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI of the Civil Rights Act of 1964, and other non-discrimination authorities under federal law, and specifically the provisions of the equal opportunity clause. The Contractor shall comply with all federal, state and local laws, ordinances, rules and regulations of any authorities throughout the duration of this Contract. The Contractor shall be responsible for compliance with any such law, ordinance, rule or regulation, and shall hold Town harmless and indemnify same in the event of non compliance. SECTION 7. Contractor's Warranties and Representations The Contractor represents that its staff is knowledgeable about and experienced in performing the Services required in this Contract and warrants that it will use its best skill and attention to provide the above-described Services in a professional, timely manner. The Contractor is fully qualified to act as the general contractor for the required Services and has, and shall maintain, any and all licenses, permits or other authorizations necessary to act as the general contractor for the provision of the Services. The Contractor is familiar with the site(s) at which the Services are to be performed. The Contractor warrants and represents that it shall be responsible for all subcontractors working directly for it, as well as for their work product, as though Contractor had performed the Services itself. The Town Administrator may, in writing, require the Contractor to remove from the work site any employee or subcontractor the Town Administrator deems incompetent, careless or otherwise objectionable. If equipment, materials and supplies are to be included as part of the Services provided, all equipment, materials and supplies so included and provided by the Contractor are to be of the most suitable grade for the purposes intended. When requested, the Contractor shall furnish the Town for approval the name of the manufacturer, the model number and other identifying data and information respecting the performance, capacity and rating of the machinery and other mechanical equipment which is incorporated in the Services provided. Machinery, equipment and materials installed and / or used without the prior approval of the Town shall be at risk of rejection. SECTION 8. Retention of Records The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the end of any audit or closure of all pending matters under this Contract, whichever is later, all books, documents, papers, and records pertinent to this Contract. The Contractor agrees to provide to the Town, any federal grantor agency, the Comptroller General of the United States, any state grantor agency, any assignee, or any of their duly authorized representatives access to such books, documents, papers, an d records for the purpose of examining, auditing, and copying them. The Contractor further agrees to include these provisions in any subcontracts issued in connection with this Contract. SECTION 9. State and Local Taxes Except as otherwise specifically provided for in the Contract, the Contract Price shall include all applicable state and local taxes. 28 RFP 2026-01 RFP Attachment C – Page 7 of 13 Town of Seabrook Island The successful Bidder shall calculate that portion of the Contract which is subject to the South Carolina sales and/or use tax, which amount shall be itemized and shown on all invoices, and shall be paid to South Carolina Department of Revenue (SCDOR) by successful Bidder. If the successful Bidder is a non- South Carolina company, the Town will withhold said amount from all invoices and remit payment to the SCDOR, unless successful Bidder furnishes Town with a valid South Carolina Use Tax Registration Certificate Number. The Contractor shall indemnify and hold harmless the Town for any loss, cost, or expense incurred by, levied upon or billed to the Town as a result of Contractor's failure to pay any tax of any type due in connection with this Contract. The Contractor shall ensure that the above sections are included in all subcontracts and sub - subcontracts and shall ensure withholding on out of state sub and sub -subcontractors to which withholding is applicable. SECTION 10. Independent Contractor The Contractor is an independent contractor and shall not be deemed the agent or employee of the Town for any purpose whatsoever. The Contractor shall not hold himself out as an employee of the Town and shall have no power or authority to bind or obligate the Town in any manner, except the Town shall make payment to the Contractor for the Services provided and necessary expenses rela ted thereto as herein provided. The Contractor shall obtain and maintain all licenses and permits required by law for performance of this Contract by him or his employees, agents, and servants. The Contractor shall be liable for and pay all taxes required by local, state or federal governments, including but not limited to social security, Workers’ Compensation, employment security, and any other taxes and licenses or insurance premiums required by law. No employee benefits of any kind shall be paid by the Town to or for the benefit of the Contractor or its employees, agents, or servants by reason of this Contract. The Contractor acknowledges and agrees that it has no independent decision -making authority related to enforcement, discretionary matters, or any aspect of ordinance administration beyond the scope of duties expressly set forth in this Agreement. The Contractor’s role is strictly administrative, and any matter requiring interpretation, policy determination, or discretion shall be referred to the Town for resolution. The Contractor shall not modify, alter, or exercise judgment regarding any aspect of the Town’s ordinances, enforcement procedures, or policies. SECTION 11. Other Contracts The Town reserves the right to undertake or award other contracts for additional work or services and may elect to complete portions of the Services included in this Contract using its own forces or through other contracts, and the Contractor shall fully c ooperate with such other contractors, Town employees and carefully fit its own work or services to such work or services as may be directed by the Town. The Contractor shall not commit or permit any act by its employees or subcontractors which will interfere with the performance of work or services by any other contractor or by Town employees. SECTION 12. Permits and Licenses The successful Bidder, and any subcontractor, shall, without additional expense to the Town, be responsible for obtaining and maintaining all necessary licenses and permits required by the State of 29 RFP 2026-01 RFP Attachment C – Page 8 of 13 Town of Seabrook Island South Carolina or the Town or any other authority having jurisdiction over the provided Services. Prior to execution of a contract, the successful Bidder and subcontractor may be required to provide a copy of its current applicable Contractor’s Licenses issued by the State of South Carolina and the Town. SECTION 13. Safety, Health, and Security Precautions The Contractor shall take proper safety, health and security precautions to protect its workers and the Town's property, workers and the public at all times during the term of this Contract. All materials shall be stored securely, protected from theft or damage. SECTION 14. Conditions Affecting the Services The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the nature and location where the Services will be provided, and the general and local conditions which can affect the provision of Services or the cost thereof. Any failure by the Contractor to do so will not relieve it from responsibility for successfully performing the Services without additional expense to the Town. The Town assumes no responsibility for any understandings or representations concerning conditio ns made by any of its officers or agents prior to the execution of this Contract, unless such understandings or representations by the Town are expressly stated in this Contract. SECTION 15. Repair of Damages During the provision of Services, the Contractor will restore or replace, when and as directed by the Town, any public or private property damaged or destroyed by the Contractor's work, equipment or employees to a condition at least equal to that existing immediately prior to the beginning of the Services. SECTION 16. Damages The Contractor expressly agrees that if the required Services, or any part thereof, is not performed or completed in a timely or professional manner in accordance with this Contract or any amendment thereto, the Contractor shall be liable to the Town for all damages which relate to the Contractor’s failure to perform or complete the Services in the manner described above. If the amount of damages are agreed to by the Town and Contractor or awarded by a Court, the Town shall have the right to deduct from and retain, out of monies which may be then due or which may become due and payable to the Contractor, the amount of such damages; and if the amount so retained by the Town is not sufficient to pay in full such damages, the Contractor and/or its sureties shal l pay to the Town the amount necessary to effect payment in full of such damages. SECTION 17. Suspension of Services The Town Administrator may order, in writing, the Contractor to suspend, delay, or interrupt all or any provision of Services for such period of time as he may determine to be appropriate for the convenience of the Town. The Town may suspend performance of its obligations under this Contract in good faith for the convenience of the Town or to investigate matters arising out of the performance of Services. The Town Administrator may order suspension of the Services in whole or in part for such time as he deems necessary because of the failure of the Contractor to comply with any of the requirements of 30 RFP 2026-01 RFP Attachment C – Page 9 of 13 Town of Seabrook Island this Contract, and the Contract's completion date shall not be extended on account of any such suspension of the provided Services. When the Town Administrator orders any suspension of the Services under the paragraph above, the Contractor shall not be entitled to any payment for Services with respect to the period during which such Services are suspended and shall not be entitled to any costs or damages resulting from such suspension. The rights and remedies of the Town provided in this Section are in addition to any other rights and remedies provided by law or under this Contract. SECTION 18. Modification of Contract The Town maintains the right to modify this Contract when modification is determined to be in the best interest of the Town ; provided however, the Contractor is given written notice of any such modification and the Town is responsible for paying Contractor for any additional expenses reasonably and necessarily incurred by Contractor which relate to the modification. Subject to the above, the Contractor shall immediately notify the Town in writing of any proposed adjustment in its fee. The Contractor is obligated to perform the revised contract when so directed by the Town Administrator and the Town is obligated to pay for the Se rvices performed pursuant to the modification. No claim by the Contractor for an adjustment hereunder shall be allowed if asserted after Final Payment under this Contract. SECTION 19. Termination A. For Convenience The Town Administrator, by advance written notice, may terminate this Contract when it is in the best interests of the Town. If this Contract is so terminated, the Contractor shall be compensated at the rate specified in the Contract for all necessary and reasonable direct costs of performing the Services to the date of termination. The Contractor will not be compensated for any other costs in connection with a termination for convenience. The Contractor will not be entitled to recover any damages in connec tion with a termination for convenience. B. For Default If the Contractor refuses or fails to perform the Services or any separable part thereof in a timely or workmanlike manner in accordance with the Contract Documents, or otherwise fails, in the sole opinion of the Town, to comply with any of the terms and conditions of the Contract Documents deemed, in the sole opinion of the Town, to be material (including, without limitation, the requirement that Contractor obtain and maintain in force all necessary permits), such refusal or failure shall be deemed a default under this Contract. In the event of a default under this Section, the Town shall have the right to terminate forthwith this Contract by written notice to the Contractor. In the event of such default, advance notice for termination is waived and the Contractor shall not be ent itled to any 31 RFP 2026-01 RFP Attachment C – Page 10 of 13 Town of Seabrook Island costs or damages resulting from a termination under this section. Whether or not the Contractor's right to proceed with the Services is terminated, it and its sureties shall be liable for any damage to the Town resulting from Contractor's default. Any wrongful termination for default shall be deemed by the Parties a term ination for convenience. C. Termination for Non-Appropriation of Funds The Town Administrator, by written advance notice, may terminate this Contract in whole or in part in the event that sufficient appropriation of funds from any source (whether a federal, state, Town or other source) are not made or sufficient funds are oth erwise unavailable, in either case, to pay the charges under this Contract. If this Contract is so terminated, the Contractor shall be compensated for all necessary and reasonable direct costs of performing the Services actually provided to the date of suc h termination. The Contractor will not be compensated for any other costs in connection with a termination for non-appropriation or unavailability of funds. The Contractor will not be entitled to recover any damages in connection with a termination for non -appropriation or unavailability of funds, including, but not limited to, lost profits. D. Rights Cumulative The rights and remedies of the Town provided in this Section are in addition to any other rights and remedies provided by law or under this Contract. SECTION 20. Indemnification Except for expenses or liabilities arising directly from the negligence or intentional acts of the Town, the Contractor hereby expressly agrees to indemnify, defend and hold the Town harmless against any and all expenses and liabilities arising out of the performance or default hereunder as follows: The Contractor expressly agrees that to the extent that there is a causal relationship between (A) its negligence, action or inaction, or the negligence, action or inaction of any of its employees or any person, firm or corporation directly or indirectly employed by the Contractor and (B) any damage, liability, injury, loss or expense (whether in connection with bodily injury or death or property damage) that is suffered by the Town and/or its officers or employees or by any member of the public, it shall indemnify, defend and save the Town and its officers and employees harmless from and against any and all liabilities, penalties, demands, claims, lawsuits, losses, damages, costs, and expenses arising directly or indirectly out of the performance of this Contract. Such costs are to include, without limitation, defense, settlement and reasonable attorney’s fees incurred by the Town and its employees. This obligation to indemnify shall include, without limitation, bodily injuries or death occurring to the Con tractor’s employees and any person, directly or indirectly employed by the Contractor (including, without limitation, any employee of any subcontractor), the Town’s officers or employees, the employees of any other independent contractors, or occurring to any member of the public. When the Town submits notice, Contractor shall promptly defend any aforementioned claim, demand or lawsuit. This obligation shall survive the suspension or termination of this Contract. The limits of insurance required in this Contract shall not limit the Contractor’s obligation of indemnification under this Section. The recovery of costs and fees all extend to those incurred in the enforcement of this indemnity. 32 RFP 2026-01 RFP Attachment C – Page 11 of 13 Town of Seabrook Island SECTION 21. Gratuities and Kickbacks Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or former employee, or for any employee or former employee to solicit, demand, accept, or agree to accept from another person a gratuity or an offer of employment in connecti on with any decision, approval, disapproval, recommendation, preparation or any part of a program requirement or a purchase request, influencing the content of any specification or procurement standard, rendering of advice, investigation, auditing, or in any other advisory capacity in any proceeding or application, request for ruling, determination, claim or controversy, or other particular matter pertaining to any program requirement of a contract or subcontract, or to any solicitation or proposal therefore. Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by or on behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or any person associated therewith, as an inducement for the award of a subcontract or order. Violation of this clause may result in Contract termination. SECTION 22. Labor: Subcontractors If any subcontractors will be used for this project, the Contractor shall provide to the Town Administrator a list of names of any of the intended subcontractors, the subcontractor's applicable license number(s), and a description of the work to be done by each subcontractor. The Contractor shall not substitute other subcontractors without the written consent of the Town Administrator. The Contractor shall be responsible for all services performed by a subcontractor as though they had been performed by the Contractor. Responsibilities include, but are not limited to, compliance with any applicable licensing regulations. If at any time the Town Administrator determines that any subcontractor is incompetent or undesirable, he or she shall notify the Contractor accordingly , and the Contractor shall take immediate steps for cancellation of the subcontract and replacement. Nothing herein shall create any contractual relationship between any subcontractor and the Town. It shall be the Contractor’s responsibility to ensure that all terms required in the attached Contract are incorporated into all subcontracts SECTION 23. Confidentiality and Use of Name Contractor agrees that it will not release any information relating to this Contract including without limitation press releases, advertisements, or marketing materials without the prior written consent of the Town. SECTION 24. Force Majeure The Town will not be liable for contract default or delay due to acts beyond its reasonable control. Contractor shall inform the Town in writing whenever it becomes aware of facts or circumstances which may delay or prevent its performance. SECTION 25. Assignment 33 RFP 2026-01 RFP Attachment C – Page 12 of 13 Town of Seabrook Island The Contractor shall not assign in whole or in part the Contract without the prior written consent of the Town. The Contractor shall not assign any money due or that may become due to it under said Contract without the prior written consent of the Town. Each Party binds itself, its successors, assigns, executors, administrators or other representatives to the other Party hereto and to successors, assigns, executors, administrators or other representatives of such other Party in connection with all terms a nd conditions of the Contract. SECTION 26. Controlling Law This Contract shall be governed by the laws of the State of South Carolina. SECTION 27. Incorporation by Reference The Request for Proposals applicable to the Services, together with all addenda, attachments and exhibits thereto, are hereby incorporated by reference into this Contract as if set out in full. SECTION 28. Entire Contract This Contract constitutes the entire understanding and agreement between the Parties hereto and supersedes all prior and contemporaneous written and oral contracts between the Parties and their predecessors in interest regarding the subject matter of this Contract. This Contract may not be changed, altered, amended, modified, or terminated orally, except as specifically provided, and any such change, alteration, amendment, or modification must be in writing and executed by the Parties hereto. SECTION 29. Severance Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid, illegal, or against public policy, said offending Section shall be void and of no effect and shall not render any other Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should survive the suspension, termination or expiration hereof shall be deemed to so survive. SECTION 30. Non-waiver Any waiver of any default by either Party to this Contract shall not constitute waiver of any subsequent default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver of, any subsequent default hereunder. SECTION 31. Set-Off The Town shall at all time have the right to set-off any amounts owing from the Contractor to the Town against any amount owing from the Town to the Contractor. At the Town’s option, repayment in lieu of set-off may be required. IN WITNESS WHEREOF, the Parties hereto have executed this Contract under their several seals the day and year first written above. Contractor Town of Seabrook Island By: ______________________________ By: ______________________________ 34 RFP 2026-01 RFP Attachment C – Page 13 of 13 Town of Seabrook Island Its: ______________________________ Its: ______________________________ Attest: ______________________________ Attest: ______________________________ 35 RFP 2026-01 RFP Attachment C – Page 14 of 13 Town of Seabrook Island Exhibits to Beach Patrol Services Contract [INSERT] Exhibit A: Request for Proposals (RFP) No. 2026-01 [INSERT] Exhibit B: RFP No. 2026-01 – General Terms and Conditions [INSERT] Exhibit C: RFP No. 2026-01 – Scope of Services [INSERT] Exhibit D: RFP No. 2026-01 – Insurance Requirements [INSERT] Exhibit E: Contractor’s Insurance certificate(s) and endorsement(s) 36 RFP 2026-01 RFP Attachment D – Page 1 of 1 Town of Seabrook Island ATTACHMENT D INSURANCE REQUIREMENTS (Contracts Greater Than $10,000) The successful Bidder will be required, at its own expense, to procure and maintain for the duration of their contract with the Town insurance against claims for injuries to persons or damages to property which may arise from or i n connection with Services provided by the Contractor, its agents, representatives, employees or subcontractors. 1. The successful Bidder shall carry and maintain Workman’s Compensation Insurance in statutory amounts for its employees. 2. The successful Bidder shall carry and maintain a comprehensive general liability policy of at least one million dollars ($1,000,000.00) per occurrence (combined single limit of liability) to cover operations, equipment and contractual liability. The policy shall name the Town of Seabrook Island as an additional named insured. 3. The successful Bidder shall maintain automobile insurance liability policies on all vehicles used in the performance of the Services with at least five hundred thousand / one million dollars ($500,000.00 / $1,000,000.00) coverage. 4. Any deductibles or self-insured retentions larger than $5,000 must be declared to and approved by the Town. 5. Each Insurance policy required by the Town shall be endorsed to state that should any of the required policies be cancelled before the expiration date thereof, notice will be delivered to the Town prior to the date of such cancellation. 6. All coverages for subcontractors shall be subject to all the requirements stated herein. 7. Insurance must be placed with an approved insurance company with current Best's rating of A+, A, or A - and minimum Financial Size Category (FSC) of VIII or greater. Exceptions to this requirement must be approved in writing by the Town Administrator. 8. The Contractor shall furnish the Town with Certificates of Insurance noting the endorsements. The Certificates and endorsements for each insurance policy are to be signed by a person authorized by that insurer to bind coverage on its behalf. All certificates and endorsements are to be received and approved by the Town before work commences. The Town reserves the right to require complete, certified copies of all required insurance policies, at any time. Required certificates should be mailed to: Town Administrator Town of Seabrook Island 2001 Seabrook Island Road Seabrook Island, SC 29455 The Certificates shall be attached to the Contract as Exhibit E 37 RFP 2026-01 RFP Attachment E – Page 1 of 1 Town of Seabrook Island ATTACHMENT E Non-Collusion Oath CITY/TOWN OF: _________________________________ STATE OF: _________________________________ Before me, the Undersigned, a Notary Public, for and in the Town and State aforesaid, personally appeared __________________________________ and made oath that the Bidder herein, its agents, servants, and/or employees, to the best of its knowledge and belief, have not in any way colluded with anyone for and on behalf of the Bidder, or itself, to obtain information that would give the Bidder an unfair advantage over others, nor have it colluded with anyone for and on behalf of the Bidder, or itself, to gain any favoritism in the award of the Contract herein. SWORN TO BEFORE ME THIS _____ DAY OF __________________, 20___ NOTARY PUBLIC FOR THE STATE OF _____________________________________ My Commission Expires: _________________ Print Name: ___________________________ Address: ______________________________ _____________________________________ Phone Number: ________________________ _________________________________________ Authorized Signature for Bidder _________________________________________ Print Bidder’s Name Bidder’s Address: _________________________________________ _________________________________________ NOTARY SEAL (Required for Out of State Bidders) 38 Discretionary Grants Program: Program Guidelines Page 1 of 6 DISCRETIONARY GRANTS PROGRAM PROGRAM GUIDELINES Adopted February 24, 2026 [Anticipated] Note: Additions Deletions PURPOSE The Discretionary Grants Program is intended to support eligible organizations in carrying out Projects that advance a legitimate public purpose and provide a direct and demonstrable benefit to the Town of Seabrook Island (the “Town”), including, but not limited to, its residents, property owners, visitors, and/or businesses. Grant funds shall be used to promote community wellness, civic engagement, cultural and historical awareness, economic vitality, environmental stewardship, and wildlife conservation in a manner consistent with applicable law, Town policy, and sound fiscal accountability. As used herein, the term “Project” means any program, project, activity, initiative, or undertaking for which funding from the Discretionary Grants Program is requested or awarded. APPLICANT ELIGIBILITY Discretionary Grants may be awarded by the Town to organizations that: • Are recognized as tax-exempt under Section 501(c) of the Internal Revenue Code;, including: • • Section 501(c)(3) – Charitable, religious, educational, and scientific organizations; • Section 501(c)(4) – Social welfare organizations; • Section 501(c)(6) – Business leagues and chambers of commerce; • Section 501(c)(7) – Social and recreational clubs; • Section 501(c)(8) and (10) – Fraternal beneficiary societies; and • Section 501(c)(19) – Veterans’ organizations; • Are established for benevolent, social welfare, scientific, educational, environmental, philanthropic, humane, patriotic, public health, civic, or other eleemosynary purposes, or for the benefit of public safety personnel; • Employ a charitable purpose or appeal as the basis for solicitation; or • Are units of local government created or authorized by the State of South Carolina, including counties, municipalities, school districts, and special purpose districts. Religious organizations MAY be eligible for grant funding, provided the proposed Project serves a secular (non-religious) public purpose. 39 Discretionary Grants Program: Program Guidelines Page 2 of 6 Individuals and organizations affiliated with a national, state, or local political party or candidate are NOT eligible for grant funding. Eligible organizations must allow open membership to all interested persons. Pursuant to the South Carolina Solicitation of Charitable Funds Act (S.C. Code Ann. Title 33, Chapter 56), charitable organizations that solicit contributions or have contributions solicited on their behalf must register annually with the South Carolina Secretary of State unless exempt. Applicants must provide documentation of their current registration or exemption status with their grant application. This requirement shall not apply when the applicant is a unit of local government. PROJECT ELIGIBILITY Discretionary Grants may be awarded to eligible organizations to support any lawful Project that: • Promotes community wellness, cultural or historical awareness, or economic development; • Enhances citizen participation, satisfaction, or sense of place; • Preserves or protects wildlife and wildlife habitat; • Supports environmental or wildlife conservation efforts; or • Increases public knowledge of environmental, wildlife, or community issues affecting the Town. Preference shall be given to Projects occurring within the Town’s corporate limits. Projects outside the Town limits may be considered if they provide a clear and demonstrable benefit to the Town or its residents, visitors, and/or businesses. All grant funds must advance a legitimate public purpose. Unless expressly authorized by Town Council, grant funds shall NOT be used for: • Cash, gift cards, and other items of monetary valuePrizes, awards, trophies, gift cards, raffles, or giveaways, including cash or items of monetary value distributed to participants or attendees, provided, non-cash awards, trophies, and other giveaways of nominal value may be permitted; • Sub-grants or pass-through funding, including redistribution of grant funds to other organizations, individuals, or entities not directly approved by the Town; • Activities that violate federal, state, or local laws, regulations, ordinances, or other Town policies; • Political activities, including support of political parties, candidates, campaigns, or ballot initiatives; 40 Discretionary Grants Program: Program Guidelines Page 3 of 6 • Religious instruction, worship services, or proselytizing, provided, however, faith- based organizations may receive funding for Projects serving a secular public purpose; • Operating deficits or debt repayment, including payment of past-due bills, loans, or financial obligations; • Fundraising activities or events, including costs associated with soliciting donations or hosting fundraising campaigns; • Alcoholic beverages, except as expressly approved as part of a permitted community event in compliance with applicable law; • Personal expenses, including stipends, honoraria, or compensation not directly related to the approved Project or not supported by appropriate documentation; • Capital improvements or property acquisition, including land purchases or permanent structural improvements; • Travel expenses not directly related to Project implementation within, or providing a direct benefit to, the Town; • Expenses incurred prior to grant approval; • Administrative overhead not reasonably allocable to the approved Project, including general office expenses unrelated to the Project; or • Any other use inconsistent with the approved grant application or the terms and conditions of the award. Town Council reserves the right to amend or limit eligibility criteria at any time. GRANT AWARDS Grant awards shall range from $250.00 (minimum) to The maximum grant award shall be $5,000.00 (maximum) per organization per calendar year. The total funding available each calendar year shall not exceed the amount appropriated by Town Council in the annual budget ordinance. The Town is not obligated to award all available funds. Organizations may submit multiple applications; however, the total amount awarded to any organization shall not exceed $5,000.00 in a calendar year. APPLICATION Applications must be submitted to the Town Finance Director during the calendar year in which funds are proposed to be expended. Unless otherwise authorized, applicants shall use the standard application form prescribed by the Town Administrator. 41 Discretionary Grants Program: Program Guidelines Page 4 of 6 Application acceptance periods, review schedules, and submission deadlines shall be established annually by the Town Administrator and publicly announced by the Town. Applications shall be accepted until the earlier of October 1st or until all available funds for the calendar year have been committed. Completed applications shall be submitted to: Town of Seabrook Island Attn: Finance Director 2001 Seabrook Island Road Seabrook Island, SC 29455 REVIEW PROCEDURES The Town Finance Director shall review all grant applications for completeness. Complete applications shall be placed on the agenda for the next meeting of the Town’s Discretionary Grants Committee (the “Committee”). The Committee shall review each application and provide a recommendation to Town Council. In performing these functions, the Committee shall have the authority to: • Establish procedures for reviewing applications; • Request additional information from applicants; and • Recommend modifications necessary to ensure applications conform to grant criteria. The Committee shall provide a recommendation to approve (in whole or in part) or deny each request. Once the Committee has provided a recommendation, the application shall be placed on the agenda for the next Town Council meeting, at which time Town Council shall review the request and render a final decision. Town Council retains final authority to approve or deny all grant applications. A representative of the applicant must attend both the Committee meeting and Town Council meeting (either in person or virtually) at which the application will be considered. Failure to attend may result in deferral or denial. EVALUATION CRITERIA In reviewing grant applications, the Committee and Town Council shall consider the following criteria: • Public Benefit: The extent to which the Project provides a direct and demonstrable benefit to the Town, its residents, visitors, and/or businesses. • • Alignment with Program Purpose: The degree to which the proposal advances one or more of the program’s stated purposes, including community wellness, cultural and historical awareness, economic development, citizen engagement, environmental stewardship, and wildlife conservation. • 42 Discretionary Grants Program: Program Guidelines Page 5 of 6 • Organizational Capacity: The applicant’s demonstrated ability to successfully implement the Project, including relevant experience, staffing, partnerships, and financial stability. • • Project Feasibility and Work Plan: The clarity, completeness, and reasonableness of the proposed scope of work, timeline, activities, and methods for achieving stated objectives. • • Budget and Cost Effectiveness: The reasonableness of the proposed budget and the extent to which grant funds will be used efficiently, including leveraging other funding sources or in-kind contributions when applicable. • • Measurable Outcomes: The extent to which the application identifies clear goals, performance measures, or outcomes that can be used to evaluate Project success. • • Community Impact and Engagement: The anticipated level of participation, collaboration, or engagement with the Seabrook Island community. • • Project Sustainability/Long-Term Impact: The potential for the Project to achieve long-term impact or continue beyond the grant period.; and • • Compliance and Accountability: The applicant’s history of compliance with prior Town grant requirements, if applicable, including timely reporting and proper use of funds. GRANT AGREEMENT Upon approval of a grant award by Town Council, each recipient must execute a written grant agreement with the Town prior to the disbursement of any grant funds. The grant agreement shall set forth the terms and conditions governing the use of grant funds and shall include, at a minimum, the following: • Grant Award Amount: The total amount of funds awarded to the recipient organization. • Project Description and Scope of Work: A summary of the approved Project, including key objectives, deliverables, and timelines. • Authorized Use of Funds: The specific costs and budget categories for which grant funds may be expended, consistent with the approved application and applicable Town policies. • Disbursement Procedures: The process for requesting disbursement of grant funds, including required documentation and applicable deadlines. • Reporting Requirements: Required financial documentation, performance measures, and final reporting obligations. • Compliance Requirements: An obligation to comply with all applicable federal, state, and local laws, Town ordinances, and program guidelines. • Audit and Recordkeeping Provisions: Requirements for maintaining financial records and making such records available to the Town for review or audit upon request. 43 Discretionary Grants Program: Program Guidelines Page 6 of 6 • Indemnification and Liability Provisions: Terms addressing responsibility for claims, damages, or losses arising from the Project. • Termination and Repayment Provisions: Conditions under which the Town may suspend or terminate the agreement and require repayment of grant funds, including misuse of funds or failure to comply with agreement terms. • General Terms and Conditions: Standard contractual provisions as determined by the Town, which may include insurance requirements, non-discrimination provisions, assignment restrictions, and governing law. No grant funds shall be disbursed by the Town unless the grant agreement has been fully executed by the Mayor and the authorized representative(s) of the recipient. Failure to execute a grant agreement within 30 days of the award date shall result in forfeiture of the grant funds, unless an extension is approved by vote of Town Council. DELIVERY OF GRANT FUNDS Grant recipients shall submit a written request for disbursement to the Town Finance Director. Disbursement requests shall be accompanied by all required documentation, including invoices and/or paid receipts demonstrating the commitment or expenditure of awarded grant funds. Disbursement requests must be received no later than December 15th of the calendar year in which the grant funds were awarded. Failure to submit a disbursement request by this date may result in forfeiture of any unpaid grant funds. All disbursement requests shall be reviewed and approved by the Town Administrator prior to payment. Upon approval, the Town Finance Director shall issue payment to the grant recipient. Any grant funds that remain uncommitted or unexpended at the end of the calendar year shall revert to the Town’s General Fund. REPORTING REQUIREMENTS Grant recipients shall submit a detailed written report describing the purpose(s) for which Town funds were expended and the overall impact of the Project. The report shall be submitted to the Town Administrator on or before December 31st of the applicable calendar year, on a form provided by the Town Administrator. At a minimum, the report shall include: • A brief summary of the Project; • A detailed accounting of the expenditure of Town funds; and • A description of the outcomes achieved and the public benefits provided. 44 Discretionary Grants Program: Program Guidelines Page 7 of 6 Failure to submit the required report in a timely manner may result in enforcement actions, including, but not limited to, the withholding of future funding, the requirement to repay funds, or disqualification from future Town grant programs.The Town Administrator shall distribute copies of all reports to members of the Committee and Town Council as soon as practicable after the conclusion of the calendar year. 45 TOWN OF SEABROOK ISLAND ORDINANCE NO. 2026-01 ADOPTED ______________ AN ORDINANCE AMENDING THE TOWN OF SEABROOK ISLAND DEVELOPMENT STANDARDS ORDINANCE (“DSO”) TO ESTABLISH A PLANNED DEVELOPMENT (PD) DISTRICT AND TO UPDATE VARIOUS DEVELOPMENT REGULATIONS, ADMINISTRATIVE PROCEDURES, AND DEFINITIONS WHEREAS, the Development Standards Ordinance for the Town of Seabrook Island (the “DSO”) was adopted by the Mayor and Council of the Town of Seabrook Island on June 29, 2022, with the passage of Ordinance No. 2022-04; and WHEREAS, the DSO was amended by the Mayor and Council on October 25, 2022, with the passage of Ordinance No. 2022-06; and WHEREAS, the DSO was again amended by the Mayor and Council on June 26, 2024, with the passage of Ordinance No. 2024-03; and WHEREAS, the DSO was most recently amended by the Mayor and Council on December 17, 2024, with the passage of Ordinance No. 2024-06; and WHEREAS, the Mayor and Council for the Town of Seabrook Island desire to further amend the DSO to: - Update references to various local, state, and federal agencies (Throughout); - Update requirements for fences, walls, and swimming pools (Article 2); - Update procedures for the establishment of zoning on annexed property (Article 3); - Establish a Planned Development (PD) District (Article 7); - Update conditional use requirements for short -term rental units related to the duties of authorized agents and qualified local contacts, and to amend the items to be included in the annual rental activity report (Article 9); - Update landscaping and buffering requirements for certain zoning districts (Article 11); - Update requirements for temporary signage (Article 13); - Clarify procedures for the issuance of certificates of occupancy and establish a procedure for the issuance of temporary certificates of occupancy (Article 18); - Update policies and procedures for text and map amendments (Article 19); - Update policies and procedures for appeals (Article 20); - Amend policies for certain nonconforming buildings and structures (Article 21); - Clarify requirements for enforcement actions and corresponding penalties (Article 22); and - Update various definitions (Appendix A – Definitions) WHEREAS, as required by law, the Town of Seabrook Island Planning Commission reviewed the proposed amendments during a regularly scheduled meeting on February 11, 2026, at which time members of the Planning Commission recommended in favor of approval of the proposed amendments, with modifications; and 46 WHEREAS, as required by law, the Mayor and Council advertised and held a public hearing on the proposed amendments during a duly called meeting on March 24, 2026, with public comments duly noted; and WHEREAS, the Mayor and Council believe it is fitting and proper to amend the DSO to achieve the objectives stated herein; NOW, THEREFORE, pursuant to the authority granted by the Constitution and the General Assembly of the State of South Carolina, BE IT ORDAINED BY THE MAYOR AND COUNCIL FOR THE TOWN OF SEABROOK ISLAND, S.C.: SECTION 1. Adopting Amendments to the DSO. The amended version of the DSO, a copy of which is attached hereto as “Exhibit A”, is hereby adopted by reference as if fully set forth in this section. SECTION 2. Conflicting Ordinances Repealed . All ordinances or parts of ordinances in conflict with the provisions of this ordinance are hereby repealed. SECTION 3. Severability. If any section, subsection, paragraph, clause, or provision of this ordinance shall be deemed to be unconstitutional, unenforceable, or otherwise invalid by the final decision of a court of competent jurisdiction, it shall be construed to have been the legislative intent of Town Council to pass said ordinance without such unconstitutional provision, and the validity of all remaining sections, subsections, paragraphs, clauses, or provisions of said ordinance shall not be affected thereby. If said ordinance, or any provision thereof, is held by the final decision of a court of competent jurisdiction to be inapplicable to any person, group of persons, property, kind of property, circumstances or set of circumstances, such holding shall not affect the applicability thereof to any other persons, property or circumstances. SECTION 4. Effective Date . This ordinance shall be effective from and after the date of adoption. SIGNED AND SEALED this _____ day of ___________________, 202 6, having been duly adopted by the Mayor and Council for the Town of Seabrook Island on the _____ day of ___________________, 2026. First Reading: February 24, 2026 TOWN OF SEABROOK ISLAND Public Hearing: March 24, 2026 Second Reading: March 24, 2026 _______________________________ Bruce Kleinman, Mayor LEGAL REVIEW ATTEST _______________________________ _______________________________ Stafford J. McQuillin, Town Attorney Peter D. Wiggins II, Town Clerk 47 EXHIBIT A To Ordinance No. 2026-01 Town of Seabrook Island Development Standards Ordinance (Amended) 48 Town of Seabrook Island Development Standards Ordinance [Title Page] Adopted: June 29, 2022 Current Through: TBD ORDINANCE STANDARDS DEVELOPMENT 49 Town of Seabrook Island Development Standards Ordinance 2 Town of Seabrook Island Development Standards Ordinance TABLE OF CONTENTS Article 1: Purpose, Organization and Enactment ............................................................................... 712 Section 1.1 Title and Purpose ................................................................................................. 813 Section 1.2 Enabling Authority ............................................................................................... 813 Section 1.3 Scope and Interpretation..................................................................................... 813 Section 1.4 Conflicting Regulations........................................................................................ 914 Section 1.5 Effect of this Ordinance ....................................................................................... 914 Section 1.6 Vested Rights ........................................................................................................ 914 Section 1.7 Rules of Construction ......................................................................................... 1015 Section 1.8 Repeal of Ordinances ........................................................................................ 1116 Section 1.9 Severability .......................................................................................................... 1217 Section 1.10 Enactment and Effective Date ............................................................................ 1217 Article 2: General Provisions ............................................................................................................... 1318 Section 2.1 General Compliance .......................................................................................... 1419 Section 2.2 BUILDINGs .......................................................................................................... 1722 Section 2.3 LOTs ..................................................................................................................... 1823 Section 2.4 SETBACKs ........................................................................................................... 1924 Section 2.5 STRUCTUREs ....................................................................................................... 2126 Section 2.6 USEs ..................................................................................................................... 2631 Section 2.7 Utilities and Services .......................................................................................... 2833 Article 3: Zoning Districts and Map.................................................................................................... 3035 Section 3.1 Districts Established ........................................................................................... 3136 Section 3.2 ZONING MAP...................................................................................................... 3136 Section 3.3 District Boundaries Interpreted ........................................................................ 3136 Section 3.4 LOTs Divided by a Zoning Line......................................................................... 3237 Section 3.5 Zoning of Vacated Areas ................................................................................... 3237 Section 3.6 Zoning of Annexed Property ............................................................................. 3237 Article 4: Conservation/Recreation Districts ..................................................................................... 3338 Section 4.1 Purpose ............................................................................................................... 3439 50 Town of Seabrook Island Development Standards Ordinance 3 Section 4.2 Schedule of Uses ................................................................................................ 3439 Section 4.3 Spatial Requirements ......................................................................................... 3641 Section 4.4 Site Development Regulations ......................................................................... 3742 Article 5: Residential Districts ............................................................................................................. 3843 Section 5.1 Purpose ............................................................................................................... 3944 Section 5.2 Schedule of Uses ................................................................................................ 3944 Section 5.3 Spatial Requirements ......................................................................................... 4045 Section 5.4 CONSERVATION SUBDIVISIONS ..................................................................... 4449 Section 5.5 Site Development Regulations ......................................................................... 4752 Article 6: Support Districts .................................................................................................................. 4853 Section 6.1 Purpose ............................................................................................................... 4954 Section 6.2 Schedule of Uses ................................................................................................ 4954 Section 6.3 Spatial Requirements ......................................................................................... 5055 Section 6.4 Site Development Regulations ......................................................................... 5156 Article 7: Mixed Use Districts .............................................................................................................. 5358 Section 7.1 Mixed Use (MU) District ..................................................................................... 5459 Section 7.2 Planned Development (PD) District.................................................................. 6671 Article 8: Overlay Districts ................................................................................................................... 8489 Section 8.1 Seabrook Island Road Overlay District ............................................................ 8590 Section 8.2 SHORT-TERM RENTAL Overlay District ........................................................... 9398 Article 9: Conditional Use Requirements ........................................................................................ 96101 Section 9.1 Scope ................................................................................................................. 97102 Section 9.2 Application and Review ................................................................................... 97102 Section 9.3 General Requirements ..................................................................................... 97102 Section 9.4 Specific Use Requirements .............................................................................. 98103 Article 10: Environmental Performance Standards ...................................................................... 142147 Section 10.1 Purpose ............................................................................................................ 143148 Section 10.2 Vegetation. ....................................................................................................... 143148 Section 10.3 Coastal Tidelands and WETLANDs. .............................................................. 143148 Section 10.4 Oceanfront and North Edisto River SETBACKs. ........................................... 143148 Section 10.5 Requirements for CRITICAL AREAS and WATERBODIES. .......................... 144149 Section 10.6 Dunes. ............................................................................................................... 145150 Section 10.7 Permits. ............................................................................................................. 145150 Article 11: Landscaping and Buffering .......................................................................................... 147152 51 Town of Seabrook Island Development Standards Ordinance 4 Section 11.1 Purpose ............................................................................................................ 148153 Section 11.2 General Provisions .......................................................................................... 148153 Section 11.3 Specific Landscaping Requirements ............................................................. 148153 Section 11.4 Materials, Installation, and MAINTENANCE ................................................. 155160 Section 11.5 Tree Preservation ............................................................................................ 157162 Article 12: Parking and Loading ..................................................................................................... 161166 Section 12.1 Purpose ............................................................................................................ 162167 Section 12.2 General Requirements .................................................................................... 162167 Section 12.3 Required Off-Street Parking ........................................................................... 164169 Section 12.4 Design Requirements ..................................................................................... 166171 Section 12.5 Off-Street LOADING Requirements .............................................................. 169174 Article 13: Signs ............................................................................................................................... 171176 Section 13.1 Purpose, Findings, and Intent ........................................................................ 172177 Section 13.2 General Provisions .......................................................................................... 173178 Section 13.3 Permitted Permanent SIGNs by District ........................................................ 179184 Section 13.4 Community SIGNs ........................................................................................... 182187 Section 13.5 TEMPORARY SIGNs ........................................................................................ 183188 Section 13.6 SIGN Permits .................................................................................................... 185190 Section 13.7 NONCONFORMING SIGNs ........................................................................... 187193 Section 13.8 Inspection and MAINTENANCE .................................................................... 187193 Section 13.9 Enforcement..................................................................................................... 187193 Article 14: Site Development Plan ................................................................................................. 189195 Section 14.1 Purpose ............................................................................................................ 190196 Section 14.2 Applicability ..................................................................................................... 190196 Section 14.3 Exemptions ...................................................................................................... 191197 Section 14.4 Application and Review .................................................................................. 191197 Section 14.5 Site Plan Requirements ................................................................................... 194200 Section 14.6 Review Criteria ................................................................................................. 196202 Section 14.7 Conditions ........................................................................................................ 197203 Section 14.8 Changes to an Approved Plan ....................................................................... 198204 Section 14.9 Time Limits ....................................................................................................... 198204 Section 14.10 Appeals ............................................................................................................ 199205 Article 15: Subdivision: Purpose and Procedures ........................................................................ 200206 Section 15.1 Scope and Purpose ......................................................................................... 201207 52 Town of Seabrook Island Development Standards Ordinance 5 Section 15.2 SUBDIVISION Type and Approval Authority ................................................ 201207 Section 15.3 Procedures and Plan Requirements .............................................................. 203209 Article 16: Subdivision: Design Requirements ............................................................................. 210216 Section 16.1 Purpose ............................................................................................................ 211217 Section 16.2 Design Standards ............................................................................................ 211217 Section 16.3 Required IMPROVEMENTs. ............................................................................ 215221 Section 16.4 Modifications ................................................................................................... 217223 Section 16.5 Appeals ............................................................................................................ 218224 Section 16.6 Street Naming Policy ....................................................................................... 218224 Article 17: Duties and Responsibilities .......................................................................................... 223229 Section 17.1 ZONING ADMINISTRATOR ............................................................................ 224230 Section 17.2 PLANNING COMMISSION ............................................................................. 224230 Section 17.3 TOWN COUNCIL ............................................................................................. 226232 Section 17.4 Board of Zoning Appeals ............................................................................... 227233 Article 18: Permits and Fees ........................................................................................................... 229235 Section 18.1 Minimum Requirements ................................................................................. 230236 Section 18.2 Required Permits ............................................................................................. 230236 Section 18.3 Fees ................................................................................................................... 234240 Section 18.4 PERFORMANCE GUARANTEEs ..................................................................... 234240 Article 19: Amendments ................................................................................................................. 237243 Section 19.1 Ordinance Text or Map Amendments .......................................................... 238244 Section 19.2 Amendment Procedure .................................................................................. 238244 Section 19.3 Criteria for Amendments ................................................................................ 242248 Section 19.4 Challenges ....................................................................................................... 244250 Article 20: Appeals .......................................................................................................................... 246252 Section 20.1 Purpose and Authority .................................................................................... 247253 Section 20.2 Administrative Appeals .................................................................................. 247253 Section 20.3 VARIANCEs ...................................................................................................... 249255 Section 20.4 Special Exceptions .......................................................................................... 251257 Section 20.5 Decisions of the Board .................................................................................... 251257 Section 20.6 Appeals of Board Decisions ........................................................................... 251257 Article 21: Nonconformities ............................................................................................................ 252258 Section 21.1 Intent ................................................................................................................. 253259 Section 21.2 NONCONFORMING Uses .............................................................................. 253259 53 Town of Seabrook Island Development Standards Ordinance 6 Section 21.3 NONCONFORMING BUILDINGs and STRUCTUREs ................................... 254260 Section 21.4 NONCONFORMING LOTs of Record ........................................................... 255261 Section 21.5 Non-Reversion ................................................................................................. 255261 Section 21.6 Unlawful Nonconformities .............................................................................. 255261 Article 22: Enforcement and Penalties .......................................................................................... 256262 Section 22.1 Minimum Requirements ................................................................................. 257263 Section 22.2 Enforcement..................................................................................................... 257263 Section 22.3 Violations .......................................................................................................... 258264 Section 22.4 Penalties ........................................................................................................... 259265 Section 22.5 Appeals ............................................................................................................ 260266 Appendix A: Definitions .................................................................................................................. 261267 Appendix B: Consolidated Table of Uses ..................................................................................... 280286 Appendix C: Consolidated Table of Spatial Requirements ........................................................ 284290 Appendix D: Plant Materials ........................................................................................................... 287293 Section D.1 Appropriate for PARKING LOTs and BUFFERs ........................................... 288294 Section D.2 Appropriate Native and Naturalized Species.............................................. 290296 Section D.3 Prohibited Plant Material ............................................................................... 293299 Appendix E: Fee Schedule ............................................................................................................. 296302 54 Town of Seabrook Island Development Standards Ordinance 7 Article 1: Purpose, Organization and Enactment ARTICLE 1 Purpose, Organization, and Enactment Town of Seabrook Island Development Standards Ordinance 55 Town of Seabrook Island Development Standards Ordinance 8 Section 1.1 Title and Purpose A. This ordinance shall be known as the “TOWN of Seabrook Island Development Standards Ordinance” and may also be referred to as the “DSO” or “this ordinance.” B. The purpose of this ordinance is to: 1. guide DEVELOPMENT in accordance with existing and future needs; 2. protect, promote, and improve the public health, safety, morals, convenience, order, appearance, prosperity, and general welfare; 3. preserve the environmental character of the community; 4. facilitate the timely and adequate provision of water, sewage disposal, other UTILITY services, parks, and other public infrastructure; 5. regulate the density and distribution of populations and the uses of BUILDINGs, STRUCTUREs and land for trade, residence, recreation, and conservation; 6. secure safety from fire, FLOOD, and other dangers; and 7. further the public welfare in any other regard specified by TOWN COUNCIL. C. In accordance with the South Carolina Local Government Comprehensive Planning Enabling Act, this ordinance is based on a COMPREHENSIVE PLAN for the TOWN, which promotes safeguarding the character and unique resources of the community, while providing for a range of land uses in harmony with that character and the ability to provide public services. Section 1.2 Enabling Authority A. The TOWN COUNCIL is authorized to adopt this ordinance pursuant to the enabling authority contained in the S.C. Code of Laws, Sections 6-29-710, et. seq., and all other relevant laws of the State of South Carolina. B. Whenever any provision of this ordinance refers to or cites a section of the S.C. Code of Laws and that section is later amended or superseded, this ordinance shall be deemed amended to refer to the amended section or the section that most nearly corresponds to the superseded section. Section 1.3 Scope and Interpretation A. This ordinance affects and regulates the use, DEVELOPMENT, preservation, and occupancy of all land, BUILDINGs, and STRUCTUREs within the TOWN. B. In the interpretation and application of this ordinance, all provisions shall be considered as minimum requirements, liberally construed in favor of the TOWN COUNCIL, and deemed neither to limit nor repeal any other powers granted under state law. This ordinance is not intended to repeal, abrogate, or impair any existing EASEMENTs, covenants, or deed restrictions. 56 Town of Seabrook Island Development Standards Ordinance 9 Section 1.4 Conflicting Regulations This ordinance affects and regulates the use, DEVELOPMENT, preservation, and occupancy of all land, BUILDINGs, and STRUCTUREs within the TOWN. In those instances where the ordinance imposes greater limitations or restrictions than those imposed by the provisions of other ordinances, instruments of land conveyance, private restrictions or land use covenants, or other laws or instruments purporting to affect land use, the provisions of this ordinance shall control. Whenever the provisions of any other statute or regulation require more restrictive standards than are required by this ordinance, the provisions of such statute or regulation shall govern. Section 1.5 Effect of this Ordinance No land, BUILDING, STRUCTURE, or other premises shall be used, developed, or occupied and no BUILDING or STRUCTURE shall be constructed, reconstructed, moved, removed, extended, enlarged, or altered except in compliance with the provisions of this ordinance. Section 1.6 Vested Rights A. Findings. 1. The General Assembly of the State of South Carolina, by Act 287 of 2004, amended the South Carolina Local Government Comprehensive Planning Enabling Act (Title 6, Chapter 29 of the S.C. Code of Laws) to add Article 11 cited as the “Vested Rights Act.” 2. TOWN COUNCIL has determined that it is in the best interest of the TOWN to avoid the default provisions and to maintain and allow for local government control and flexibility of local planning and zoning functions to the extent allowed by law. B. Establishment and Conditions of Vested Rights. 1. Vested Rights Established. A vested right to develop property in accord with a site-specific development plan is triggered upon the final approval of the site-specific development plan by the reviewing authority authorized to approve the site-specific development plan, and the payment to the TOWN of all applicable established fees. While the TOWN may approve grading, installation of utilities, streets, or other infrastructure under separate permits in anticipating site-specific development plan approval, any such construction or any expenditure in preparing documents for further permits is done at risk, since rights are not vested in the site-specific development plan until it is approved and fees paid. 2. Subject to the South Carolina Code of Laws and Legislative Joint Resolutions. Except as hereinafter set forth, a vested right established by this ordinance is subject to the conditions and limitations set out in Sections 6-29-1540 and 6-29-1550 of the Code of Laws of South Carolina, as enacted by Act 287 of 2004, and subsequent joint resolutions so long as they are in effect. 3. Expiration and Extension. a. A vested right for an approved site-specific development plan expires two (2) years after the date of final approval by the review authority authorized to approve a site- 57 Town of Seabrook Island Development Standards Ordinance 10 specific development plan. A vested site-specific development plan may be amended if the amendment conforms to, or does not cause greater nonconformity with, the then current provisions of this ordinance, municipal code sections, or other applicable regulations. Approval or conditional approval of an amendment does not re-set or re- start the expiration period of a vested right. b. No sooner than three (3) months, and no later than 45 days prior to the expiration of the two-year vested right period for an approved site-specific development plan, the landowner of property with a vested right may apply to the ZONING ADMINISTRATOR for an annual extension of the vested right. The ZONING ADMINISTRATOR must approve the vested right extension, unless an amendment to the land development ordinance or regulations has been adopted that prohibits approval. No more than five (5) annual extensions of the vested right may be approved. 4. Phased DEVELOPMENT Plans. No vested rights are established for phased development plans, including approved or conditionally approved phased development plans and those plans applicable to lands proposed for annexation, unless approved under a DEVELOPMENT agreement or such development conditions as may be adopted pursuant to Section 7.4(c)(4). An approved or conditionally approved site-specific development plan, meeting the requirements of Article 14, is required prior to approval with respect to each phase of a phased development plan. Section 1.7 Rules of Construction A. The words, terms, and phrases used in this ordinance shall have the meaning assigned to them in Appendix A - Definitions, except where the context clearly indicates a different meaning. B. The following rules shall apply for construing or interpreting the terms and provisions of this ordinance: 1. Meanings and Intent. All provisions, terms, phrases, and expressions contained in this ordinance shall be construed according to the purpose statements set forth throughout this ordinance. When a specific section of this ordinance gives a different meaning than the general definition provided in Appendix A, the specific section’s meaning and application of the term shall control. 2. Headings, Illustrations, and Text. In the event of a conflict or inconsistency between the text of this ordinance and any heading, caption, figure, illustration, table, or map, the text shall control. 3. Lists and Examples. Unless otherwise specifically indicated, lists of items, or examples that use terms such as "for example," "including," and "such as," or similar language are intended to provide examples and are not exhaustive lists of all possibilities. 4. Computation of Time. The time in which an act is to be done shall be computed by excluding the first day and including the last day. If a deadline or required date of action falls on a Saturday, Sunday, or holiday observed by the TOWN, the deadline or required date of action shall be the next day that is not a Saturday, Sunday, or holiday observed by the TOWN. References to days are calendar days unless otherwise stated. 58 Town of Seabrook Island Development Standards Ordinance 11 5. References to Other Regulations/Publications. Whenever reference is made to a resolution, ordinance, statute, regulation, or document, it shall be construed as a reference to the most recent edition of such regulation, resolution, ordinance, statute, regulation, or document, unless otherwise specifically stated. 6. Delegation of Authority. Any act authorized by this ordinance to be carried out by the TOWN ADMINISTRATOR, ZONING ADMINISTRATOR, or other TOWN employee may be carried out by a designee of that employee. 7. Technical and Non-Technical Terms. Words and phrases shall be construed according to the common and approved usage of the language, but technical words and phrases that may have acquired a peculiar and appropriate meaning in law shall be construed and understood according to such meaning. 8. Public Officials and Agencies. a. All public officials, bodies, and agencies, and departments to which references are made are those of the TOWN, unless otherwise indicated. a.b. In the event this ordinance makes reference to a specific official, body, agency, department, or political subdivision of the county, state, or federal government, which is subsequently renamed, consolidated, or eliminated following the effective date of this ordinance, it is the intent of this ordinance that such reference shall apply to the lawful successor having jurisdiction over the subject matter, as applicable. 8.9. Mandatory and Discretionary Terms. The words "shall," "must," and "will" are mandatory in nature, establishing an obligation or duty to comply with the particular provision. The words "may" and "should" are permissive in nature. 9.10. Conjunctions. Unless the context clearly suggests to the contrary, conjunctions shall be interpreted as follows: a. "And" indicates that all connected items, conditions, provisions, or events apply; and b. "Or" indicates that one (1) or more of the connected items, conditions, provisions, or events apply. 10.11. Tenses, Plurals, and Gender. Words used in the present tense include the future tense. Words used in the singular number include the plural number and the plural number includes the singular number, unless the context of the particular usage clearly indicates otherwise. Words used in the masculine gender include the feminine gender, and vice versa. 11.12. Measuring Distance. Unless specified otherwise, in those provisions that require separation between uses or properties, measurement of distance shall be from nearest property line to nearest property line. Section 1.8 Repeal of Ordinances 59 Town of Seabrook Island Development Standards Ordinance 12 A. The repeal of any language within this ordinance, or any expiration by virtue of any provision contained within the ordinance, shall not affect any right accrued, any offense committed, any penalty or punishment incurred, or any proceeding commenced before the repeal took effect or the regulation expired. B. When any language which repealed another provision shall itself be repealed, the previous language shall not be revived without being approved as a text amendment to this ordinance, as detailed in Article 19. Section 1.9 Severability If any section, subsection, clause, or provision of these regulations shall be held to be invalid or unconstitutional by any court of competent jurisdiction, such holding shall not affect any other section, subsection, clause, provision. or portion of these regulations which is not invalid or unconstitutional. Section 1.10 Enactment and Effective Date A public hearing having been held as required by the S.C. Code of Laws, Sections 6-29-710, et. seq., as amended, and all other relevant laws of the state of South Carolina, the provisions of this ordinance are hereby adopted, and shall take effect on July 1, 2022. Whenever used in this ordinance, the term "effective date of this Ordinance" shall mean July 1, 2022. 60 Town of Seabrook Island Development Standards Ordinance 13 Article 2: General Provisions ARTICLE 2 General Provisions Town of Seabrook Island Development Standards Ordinance 61 Town of Seabrook Island Development Standards Ordinance 14 Section 2.1 General Compliance A. Ordinance Compliance. 1. Except as otherwise provided in this ordinance, no BUILDING, STRUCTURE, or premises shall be used or occupied; and no BUILDING or part of any BUILDING or other STRUCTUREs shall be erected, razed, moved, placed, reconstructed, extended, enlarged, or altered, except in conformity with the provisions of this ordinance. 2. No LOT may be altered or diminished in size to less than the minimum requirements of this ordinance; provided, a LOT may be reduced below the requirements of this ordinance to meet the needs of a PRIVATE or PUBLIC UTILITY (e.g., a pumping station or electrical substation). B. Unlawful BUILDINGs and Uses. Any BUILDING, use, or LOT which has been unlawfully constructed, occupied, or created prior to the date of adoption of this ordinance shall continue to be unlawful, unless expressly permitted by this ordinance. Such unlawful BUILDINGs, uses, or LOTs shall not be considered to be NONCONFORMING BUILDINGs, uses, or LOTs of record and shall not be afforded any protections or allowances otherwise granted to legally NONCONFORMING BUILDINGs, uses, or LOTs. C. Withholding Approval. The TOWN COUNCIL, PLANNING COMMISSION, Board of Zoning Appeals, ZONING ADMINISTRATOR, or other authorized board, commission, or administrative staff may, in its sole discretion, withhold approval of any plan, use, or permit request pending receipt of permits or approvals from other local, county, state, or federal departments or agencies. D. Excavations or Fill. 1. The construction, MAINTENANCE, or existence within the TOWN of any unprotected, unbarricaded, open, or dangerous excavations, holes, pits, or wells, which constitute or are likely to constitute a danger or menace to the public health, safety, or welfare, is hereby prohibited; provided, this subsection shall not apply to the following: a. any excavation under a permit issued by the ZONING ADMINISTRATOR where such excavation is properly protected and warning SIGNs are posted in such manner as approved by the TOWN; and b. natural water bodies, marshes, ditches, reservoirs, and other such bodies of water created or existing by authority of governmental units or agencies. 2. No property shall be increased in size by filling any CRITICAL AREA or WATERBODY by any method. E. Lighting. 1. Purpose. The purpose of this subsection is to permit reasonable uses of outdoor lighting for night-time safety, utility, security, productivity, enjoyment, and commerce while minimizing the effects of excessive or uncontrolled light in order to: 62 Town of Seabrook Island Development Standards Ordinance 15 a. Maintain consistent and uniform light levels for traffic and pedestrian safety along streets, sidewalks, and in PARKING LOTs; b. Ensure uniform lighting for security and law enforcement; c. Minimize glare, obtrusive light, and artificial sky glow by limiting outdoor lighting that is misdirected, excessive, or unnecessary; d. Curtail and reverse the degradation of the nighttime environment and the night sky; e. Prevent impacts upon shoreline wildlife; f. Minimize light pollution and light trespass from light sources onto adjacent properties; and g. Conserve energy and resources to the greatest extent possible. 2. Applicability. These provisions shall apply to all new DEVELOPMENT subject to this ordinance, unless otherwise specified. When a BUILDING, STRUCTURE, or lighting fixture is extended, enlarged, or reconstructed after the effective date of this ordinance, the applicable lighting standards shall apply. 3. Exemptions. The following lighting types shall be exempt from the lighting standards of this subsection: a. lighting within swimming pools or other water features that are governed by SCDHECSCDES regulations; b. exit SIGNs, stairs, ramps, and other illumination required by BUILDING CODES; c. holiday decorations; d. lighting of the American and government flags; and e. any lighting fixture that is exempt from the provisions of this subsection by state and/or federal law. 4. Prohibitions. The following types of lighting features shall be prohibited: a. search lights, b. strobe lights, c. laser source lights, d. any similar high-intensity or flashing light, except in emergencies by police and fire personnel or at their direction, and e. Mercury Vapor fixtures. 63 Town of Seabrook Island Development Standards Ordinance 16 5. Standards. Unless otherwise specified, the following standards shall apply to lighting fixtures in all zoning districts and applications, except those located within a street right- of-way and approved by the TOWN or SIPOA. a. General i. All exterior illuminating devices, except as may be specifically exempt, shall be hooded or shielded to prevent glare and light spill onto adjoining properties. ii. No light fixture shall exceed a height of 24 feet, measured from the ground to the top of the fixture; provided, the Planning Commission may approve taller fixtures for athletic fields where it is demonstrated that such fixtures will be properly positioned and shielded to prevent light trespass and glare onto adjoining properties; not impact shoreline wildlife; and not degrade the nighttime environment. iii. Light sources shall not be aimed at adjoining properties, streets, beaches, or upward, except in accordance with paragraph 5(d) below. iv. To control light spill and glare, lighting fixtures shall be properly aimed when installed, and proper aiming shall be maintained at all times. v. Canopy or under soffit fixtures shall be recessed into the soffit, shall not be visible from off-site, and shall not emit any glare. vi. No light fixture shall be permitted within 25 feet of the CRITICAL LINE or any BEACH TRUST property. b. Nonresidential Lighting i. Light levels in PARKING LOTs shall be reduced during non-business or non-use hours. ii. SIGNs shall not be illuminated between the hours of 11:00 PM and 6:00 AM or during any period of time when the establishment is not in use, whichever is more restrictive. c. Residential Lighting. i. Light fixtures in any residential district, including RESIDENTIAL USEs within the mixed-use district, shall not exceed 16 feet in height. ii. Light fixtures mounted on a BUILDING in a residential district may not be mounted above the 1st floor of the BUILDING. iii. Bollard lights are permitted to light driveways and pedestrian areas. d. Accent lighting. Accent lighting for sculptures, statues, trees, landscape features, flags, SIGNs, architectural features, and entrances may orient light upward, provided the directed light shall be substantially confined to the object intended to be illuminated 64 Town of Seabrook Island Development Standards Ordinance 17 to minimize glare, sky glow, and light trespass. Accent lighting shall not shine directly into the window of a neighboring STRUCTURE or directly onto a street. e. Gas lamp fixtures. Fixtures with clear, seeded, and/or translucent glass are permitted only when used with low wattage “flicker” bulbs that mimic gas lamps. Use of frosted bulbs is not a substitute for using Dark Sky compliant fixtures. Lamp types shall produce a light color that is in the color spectrum between 2700 and 3100 Kelvin. Lamp types producing a light color outside this range (e.g., mercury vapor, sodium vapor, CFL, and others) are prohibited. All lamps/light fixtures shall provide a color rendering index (CRI) of 85 or higher. f. SIGN lighting. Illumination of SIGNs shall comply with the requirements of Article 13. Internally illuminated SIGNs are not permitted and light fixtures directed at a SIGN may only be permitted where the fixtures are shielded so not to cause visible glare to PERSONs on adjacent streets or adjacent property. g. Decorative or aesthetic light fixtures. The ZONING ADMINISTRATOR may approve decorative or aesthetic lighting fixtures, including those that do not orient all light downward, if the following conditions are met: i. The fixtures shall not exceed the maximum height specified in this subsection; ii. The fixtures shall offer a design element that is complementary to the architectural style of the adjacent BUILDING(s); and iii. The fixtures shall not negatively impact neighboring residential properties or any street right-of-way. 6. Photometric Plan. A photometric plan, prepared by a registered lighting engineer, is required as part of any development plan reviewed by the PLANNING COMMISSION. The photometric plan shall be overlain on the development plan illustrating the proposed layout of lighting fixtures and foot-candles of site lighting. The following are required for review: a. Lighting plan showing light pole and fixture locations and type designations; b. Photometric plan showing horizontal luminance levels in a point-by-point format with contour lines. Canopy lighting will also be included in luminance levels; c. Lighting manufacturers’ equipment specifications and data sheets on the photometric plan; and d. Any other presentations required to convey the intent of the design. Section 2.2 BUILDINGs A. ACCESSORY BUILDINGs. 65 Town of Seabrook Island Development Standards Ordinance 18 1. ACCESSORY BUILDINGs or GARAGEs shall be considered to be part of the main BUILDING if structurally and architecturally integrated into the main BUILDING, or if attached by an enclosed breezeway or similar enclosed STRUCTURE. 2. Detached ACCESSORY BUILDINGs shall not be located closer than 10 feet to the main BUILDING or any structural appurtenance attached to the main BUILDING, such as a PORCH or raised DECK. 3. No ACCESSORY BUILDING, other than detached GARAGEs, shall be located in a FRONT YARD. 4. Accessory STRUCTUREs, such as gazebos and similar roofed, but unenclosed, STRUCTUREs, shall not be permitted within a residential zoning district, except if attached to the principal dwelling. 5. No ACCESSORY BUILDING shall be constructed on a LOT before the principal BUILDING or use is constructed or established on the LOT. 6. Unless otherwise provided in this ordinance, ACCESSORY BUILDINGs and GARAGES shall meet the minimum SETBACK requirements for principal BUILDINGS in all zoning districts. 7. If a detached GARAGE is accessed from an alley, there shall be no rear SETBACK requirement. 8. The maximum total floor area of all ACCESSORY BUILDINGs on a SINGLE-FAMILY LOT shall not exceed 50 percent of the ground floor area of the dwelling or 600 sq. ft., whichever is less. 9. In the R-CL, R-TH, and R-MF districts, detached GARAGEs shall be exempt from limits on number and size. In addition, up to three (3) ACCESSORY BUILDINGs serving a DEVELOPMENT of multiple-family or TOWNHOME units may be permitted for MAINTENANCE and storage. 10. The area of ACCESSORY BUILDINGs shall be included in the maximum LOT COVERAGE. 11. The maximum BUILDING HEIGHT of an ACCESSORY BUILDING shall not exceed 14 feet. 12. No ACCESSORY BUILDING, except as may otherwise be permitted in this ordinance, shall be occupied or rented for RESIDENTIAL USE. B. Restoring Unsafe BUILDINGs. Nothing in this ordinance shall prevent the strengthening or restoration to a safe condition of any part of any BUILDING or STRUCTURE declared unsafe by the BUILDING OFFICIAL or required to comply with his or her lawful order; provided, such restoration shall be subject to and completed in accordance with the applicable BUILDING CODES and all other applicable ordinances. Section 2.3 LOTs A. CORNER LOTs. On CORNER LOTs, the minimum FRONT YARD requirement shall be met on each street. Each CORNER LOT shall be comprised of two (2) FRONT YARDs and two (2) SIDE 66 Town of Seabrook Island Development Standards Ordinance 19 YARDs. CORNER LOTs shall have extra widths where necessary to permit the establishment of clear vision corners, as required at Section 2.4 A. B. CUL DE SAC Lots. In the case of LOTs abutting CUL DE SAC streets, the minimum required LOT WIDTH shall be measured at the required front SETBACK line. CUL DE SAC lots shall have a minimum width of 40 feet at the front lot line. C. THROUGH LOTs. On THROUGH LOTs, the minimum FRONT YARD requirement shall be met on each street. D. Minimum LOT FRONTAGE. All LOTs and parcels created after the effective date of this ordinance shall have FRONTAGE upon and be accessed from a public or PRIVATE STREET right-of-way. E. Required Area or Space. No LOT or LOTs in common ownership and no yard, court, parking area, or other space shall be so divided, altered, or reduced as to make the area or space smaller than the minimum required for the district under this ordinance in which it is located. If already less than the minimum size required, the area or space shall not be further divided or reduced. Section 2.4 SETBACKs A. Clear Vision Corner. In all zoning districts, SIGNs, FENCEs, walls, STRUCTUREs, benches, shrubbery, or other potential obstructions to vision, shall not be permitted to exceed a height of three (3) feet above the center line FINISHED GRADE of the road within a triangular area formed by the intersection of the street right-of-way lines and a line connecting two points located on those intersecting right-of-way lines 25 feet from the point where the right-of-way lines intersect; provided, UTILITY poles, street lights, and street signs shall be exempt from this requirement. B. Driveways. 1. No part of a driveway for a SINGLE-FAMILY residence shall be closer than three (3) feet to the side property lines on NONCONFORMING lots and six (6) feet on all other LOTs. 2. Residential driveways shall be at least 12 feet wide. 3. No residential driveway shall be constructed within 50 feet of an intersecting street right- of-way. 4. A shared driveway for cluster, TOWNHOME, or MULTI-FAMILY LOTs or DEVELOPMENTs is permitted to cross property lines for those properties accessed by that driveway. 67 Town of Seabrook Island Development Standards Ordinance 20 a. All such driveways shall be engineered on SITE DEVELOPMENT PLANs and presented to the ZONING ADMINISTRATOR at the time of application. With the approval of the PLANNING COMMISSION, shared driveways for cluster, TOWNHOME, and MULTI- FAMILY DEVELOPMENTs may be permitted. b. In such instances, the driveway must be a minimum of 16 feet wide. c. The ZONING ADMINISTRATOR must further certify that the proposed shared driveway does not in any manner affect proper ingress or egress to the properties sharing such driveway or other adjoining properties. d. Where shared driveways are approved, REGIME covenants must clearly define ownership and MAINTENANCE responsibilities of the owners sharing the driveway. C. FRONT YARDs. All yards abutting upon a street right-of-way, whether public or private, shall be considered as FRONT YARDs for SETBACK purposes, except as otherwise provided in this ordinance. D. Encroachments in Right-of-Way. No BUILDINGs, STRUCTUREs, service areas, or off-street parking and loading facilities, except driveways, shall be permitted to encroach into street rights-of-way. E. Encroachments into Required Yards. Certain STRUCTUREs and architectural features may project into the required yard SETBACKs, as shown in Table 2-4 E. Table 2-4 E, Encroachments into Required SETBACKs Type of Feature Maximum Allowed Encroachments into a SETBACK FRONT YARD SIDE YARD REAR YARD Accessory STRUCTUREs See Section 2.2 A Accessible ramps, wheelchair lifts and similar STRUCTUREs Least encroachment necessary to provide a reasonable accommodation pursuant to the Federal Fair Housing Act (FHA) and Title II of the Americans with Disabilities Act (ADA) Air conditioning units, generators, and other mechanical equipment, including associated stands None None / 5 ft.1 None / 5 ft.1 DECKs and PERVIOUS PATIOs None None None / 10 ft.2 Driveways See Section 2.4B Eaves and gutters None / 18 in.3 None / 18 in.3 None / 18 in.3 FENCEs and walls See Section 2.5 B. 1 In the R-SF3, R-CL, R-TH, and R-MF districts only, air conditioning units, generators, and other mechanical equipment, including associated stands, may extend no more than five (5) feet from the outer wall of a residential BUILDING; provided, however, the equipment may be no closer than three (3) feet to an adjoining property line or six (6) feet from a neighboring STRUCTURE. Equipment shall not be located within any EASEMENT, except with written permission of the EASEMENT holder. 2 Open DECKs and PERVIOUS PATIOs may encroach up to ten (10) feet into the required REAR YARD SETBACK on any residential zoned LOT which abuts a golf course or OPEN SPACE. 3 For residential lots with less than 17,500 square feet of HIGH GROUND, eaves and gutters may encroach up to eighteen (18) inches into the required SETBACK. 68 Town of Seabrook Island Development Standards Ordinance 21 Stairways and stoops, uncovered and unenclosed None / 10 ft.4 None None / 10 ft.2 SIGNs See Article 13 F. SETBACK Requirements. All SETBACKs shall be measured from the property lines; provided, if a beachfront jurisdictional line, CRITICAL AREA, or WATERBODY is present on the property, the SETBACK shall be the greater of the minimum yard SETBACK or the Oceanfront and North Edisto River SETBACK (Section 10.4 B), CRITICAL AREA SETBACK (Section 10.5 A) or WATERBODY SETBACK (Section 10.5 B) , as applicable. If located on a PRIVATE STREET, the SETBACK shall be measured from the right-of-way line or 30 feet from the edge of pavement, whichever is greater. A BUILDING shall not be erected, converted, enlarged, reconstructed, or structurally altered, except in conformity with the SETBACK requirements of the district in which it is located. G. SCDHEC-OCRMSCDES-BCM CRITICAL LINE. Whenever this ordinance requires measurement from, or based on, the SCDHEC-OCRMSCDES-BCM CRITICAL LINE, the CRITICAL LINE shall have been reviewed and certified by SCDHEC-OCRMSCDES-BCM within the previous five (5) years. Notwithstanding this requirement, CRITICAL AREAs by their nature are dynamic and subject to change over time. As such, in the event there is reason to believe a CRITICAL AREA has changed since its last review (even if the review occurred within five (5) years), the property owner may be required to have the CRITICAL LINE reviewed again and, if such a change has occurred, relocated before making any determinations requiring a measurement based on the CRITICAL LINE. Section 2.5 STRUCTUREs 4 In the R-SF3 district, uncovered and unenclosed stairways and stoops may encroach up to ten (10) feet into the required FRONT YARD SETBACK, but shall be no closer than twenty (20) feet from the street right-of-way. 69 Town of Seabrook Island Development Standards Ordinance 22 A. Awnings. 1. All awnings shall be securely attached to and supported by a BUILDING wall. No other means of support will be approved. 2. No part of the awning or its supporting frame shall be less than seven (7) feet above the surface over which it is erected. 3. No advertising shall be placed on any awning, unless specifically authorized in Article 13 as an awning SIGN and duly permitted by the town. B. FENCEs and Walls. 1. FENCEs and walls, including retaining walls, shall be permitted in all zoning districts; provided, they conform with the following: a. Any open spaces or non-solid areas shall be evenly spaced.; b. Walls must be made of stucco, cypress, pressure-treated wood, wood composite, brick, stone, architectural concrete masonry units (CMU), or similar materials; c. FENCEs must be made of stucco, cypress, pressure-treated wood, wood composite, iron, powder coated aluminum, or similar materials. Chain link fences may be permitted in the Agricultural (AGR), Recreation (RC), Camp St. Christopher (CSC), and Community Facilities (CF) districts only. Barbed wire, concertina wire, razor wire, chain link, poultry wire and vinyl are strictly prohibited in all zoning districts; d. Walls and FENCEs shall be constructed with quality materials and workmanship in accordance with prevailing BUILDING industry standards for appearance, soundness, safety, and resistance to decay and weather, and shall be maintained in good REPAIR; e. Walls and FENCEs shall be located no closer to a side or rear property line than fifty percent (50%) of the required side or rear setback for principal structures; f. No wall or FENCE shall be permitted within a required CRITICAL AREA or beachfront SETBACK area; g. No wall or FENCE shall be taller than six (6) feet in height, except in the Agricultural (AGR), Recreation (RC), Camp St. Christopher (CSC), and Community Facilities (CF) districts, where the maximum height shall be twelve (12) feet. Height shall be measured from the finished elevation at its the base of the wall or FENCE to the its highest point of the wall or FENCE. The maximum height limitation shall not apply to walls and FENCEs which are located on property owned by the TOWN or any other unit of government; provided, however, the PLANNING COMMISSION may allow a wall or FENCE to exceed six (6) feet in height when the wall or FENCE is used to screen a public BUILDING or storage yard, UTILITY STRUCTUREs or equipment, or an approved outdoor storage area in a district zoned for conservation, business, community facility, or recreation uses. 70 Town of Seabrook Island Development Standards Ordinance 23 h. Walls and FENCEs shall not exceed a height of three (3) feet within any sight EASEMENT or clear vision corner; i. When a wall or FENCE has both a finished side and an unfinished side, the finished side shall face the adjoining property or, if on the interior of the site, shall face outward toward the perimeter of the site; j. Plant materials, where required, shall be installed on the exterior side of the wall or FENCE; and k. Walls and FENCEs shall not be constructed in a way that negatively impacts drainage on the site or on adjacent properties. 2. The requirements of this section shall not apply to the REPAIR, replacement, or reconstruction of any wall or FENCE which was legally in existence as of the effective date of this ordinance. Any such wall or FENCE may be REPAIRed, REPLACEd, or reconstructed, provided: a. The extent of any NONCONFORMING element shall not be increased. For the purpose of this section, the term “element” shall include the design, materials, height and/or location of the existing FENCE; b. The extent of any previously NONCONFORMING element may not be re-established once that element has been brought into conformity, or made less NONCONFORMING, with the provisions of this ordinance; c. In the case of replacement or reconstruction, installation of the new wall or FENCE shall be completed no more than 120 days following demolition or destruction of the wall or FENCE which it will REPLACE. The ZONING ADMINISTRATOR may authorize a one-time 60-day extension in the event he or she finds, in writing, that installation may not be completed within 120 days due to circumstances which are beyond the applicant’s control; and d. Nothing in this paragraph shall be interpreted to conflict with or supersede the requirements of the applicable BUILDING CODES. 3. The provisions of this section shall not apply to the construction and/or MAINTENANCE of any wall, revetment, riprap, or similar STRUCTURE which has been duly permitted by the SCDHEC-OCRMSCDES-BCM. 4. Whenever a hedge is used in landscaping BUILDINGs other than SINGLE-FAMILY homes, the hedge shall be installed with plants of sufficient size and spacing as to attain the height required and opacity of at least seventy-five percent (75%) within two (2) years of planting. If a hedge is not in compliance with the above height and opacity requirements within two (2) years after planting, the hedge must be completed with mature plants at the developer’s expense. C. Height Exceptions. The maximum BUILDING HEIGHT for any BUILDING in the Town shall be thirty-six (36) feet above the DESIGN FLOOD ELEVATION, as required by Section 20-22 of the Town Code; provided, however, the following exceptions shall apply: 71 Town of Seabrook Island Development Standards Ordinance 24 1. MULTI-FAMILY and commercial buildings may increase the maximum allowable height by one (1) additional foot for each three (3) feet of additional FRONT YARD SETBACK, with a maximum BUILDING HEIGHT of 40 feet above the required DESIGN FLOOD ELEVATION. 2. The maximum BUILDING HEIGHT for residential structures permitted on or after January 29, 2021, may be measured from the ALTERNATE DESIGN FLOOD ELEVATION; provided, 1) the ALTERNATE DESIGN FLOOD ELEVATION is higher than the DESIGN FLOOD ELEVATION required at the time of permitting; and 2) the lowest floor elevation of the residential structure also complies with the ALTERNATE DESIGN FLOOD ELEVATION requirement. 3. Unless otherwise expressly stated, the height limitations of this ordinance shall not apply to any of the following: a. Farm buildings in the AGR zoning district; b. Electrical power transmission lines; c. Belfries, cupolas, spires, domes, monuments, flagpoles, chimneys, radio/television receiving antennas or chimney flues; or d. Bulkhead, elevator, water tank, or any other similar structure or necessary mechanical appurtenance extending above the roof of any building, if such structure does not occupy more than 33 1/3 percent of the area of the roof. D. Mechanical Equipment. 1. Mechanical equipment located on the ground shall be located in the rear or SIDE YARD in accordance with the requirements of Table 2-4 E. 2. When attached to a BUILDING, the mechanical equipment shall be architecturally integrated or appropriately screened by shrubbery or fencing so as not to be visible from neighboring property and to provide sound BUFFERing. Screening shall comply with the requirements of Section 11.3 B. 3. If located on the roof of a BUILDING or in a location that cannot otherwise be screened, the equipment shall be enclosed or designed in a manner that is architecturally integrated with the BUILDING where it is located. 4. Mechanical equipment shall not be placed within any EASEMENT, except with written permission of the EASEMENT holder. 5. The mechanical equipment shall be elevated to meet the requirements of Section 20-22 of the Town Code and all applicable BUILDING CODES. 6. All such equipment shall be located to have the least adverse impact on surrounding property owners. 7. A permit shall be obtained from the ZONING ADMINISTRATOR. 72 Town of Seabrook Island Development Standards Ordinance 25 E. Swimming Pools, Spas, Reflecting Ponds, and Hot Tubs. Any swimming pool, spa, hot tub, reflecting pond, or similar STRUCTURE whose depth at any point exceeds 24 inches shall be subject to the following regulations and shall be fenced securely, in accordance with the applicable requirements of the BUILDING CODES. 1. Swimming pools, spas, hot tubs, reflecting ponds, and similar STRUCTUREs, including changing rooms and mechanical equipment, shall only be permitted in the REAR YARD; provided, on CORNER LOTs they may be located within a SIDE YARD. 2. Swimming pools, spas, hot tubs, reflecting ponds, and similar STRUCTUREs, whether above or below ground, shall be subject to the minimum SETBACK requirements for principal BUILDINGs. 3. AsWhen required by the currently adopted South Carolina BUILDING CODES, all in- ground pools must be fenced. a. The FENCE must be at least forty-eight (48) inches in height, with an opening in one direction that does not exceed five and one-half (5½) inches. b. The FENCE must be accented with landscaping on all exterior sides not abutting a BUILDING so as to minimize its visual impact. c. In lieu of fencing, certified mechanical pool covers may be approved by the ZONING ADMINISTRATOR. c.d. In lieu of a fence, a pool wall, structure wall, natural barrier, or other allowable structure or feature may be permitted to serve as the required barrier when authorized by the BUILDING CODES administrator. d.e. Fencing material around community pools must be approved by the ZONING ADMINISTRATOR. Only materials that are harmonious and architecturally compatible with surrounding areas and DEVELOPMENTs shall be approved. F. TEMPORARY STRUCTUREs or BUILDINGs. 1. TEMPORARY STRUCTUREs and Tents. a. No STRUCTURE of a temporary nature shall be authorized or allowed to remain on any property; and no trailer, camper, shack, tent, or other similar STRUCTURE shall be used as a residence or for any other purpose, except for construction trailers and temporary sanitary facilities as provided for elsewhere in this ordinance. b. The erection of large tents and other TEMPORARY STRUCTUREs associated with recreational activities and temporary events may be authorized by the ZONING ADMINISTRATOR. In making such determination, the ZONING ADMINISTRATOR shall consider traffic patterns to and from the STRUCTURE, its proximity to nearby residences, potential noise from amplified music or other sources, the hours of the event for which the tent or STRUCTURE is being erected, and the number of days it will be present. 73 Town of Seabrook Island Development Standards Ordinance 26 c. All such STRUCTUREs or tents shall meet the minimum SETBACK requirements of the zoning district in which they are located. 2. Temporary Storage Units. a. It shall be unlawful to place or permit the placement of a temporary storage unit on any property for more than seven (7) consecutive days; provided, a longer period may be approved by the ZONING ADMINISTRATOR for BUILDING construction or remodeling projects. b. Temporary storage units shall only be placed upon or within a driveway, parking area or, if access exists to the rear of the LOT, the REAR YARD. c. No temporary storage unit shall be placed upon or within public property or a public place including, without limitation, a street, sidewalk, or out lawn. d. The temporary storage unit shall not exceed eight (8) feet in height, eight (8) feet in width and 16 feet in length. e. The temporary storage unit shall be secured in a manner that does not endanger the safety of PERSONs or property in the vicinity of the unit. f. The temporary storage unit shall be maintained in good condition, free from evidence of deterioration, weathering, discoloration, graffiti, rust, ripping, tearing or other holes or breaks at all times. g. No temporary storage unit shall be used for human occupancy or to store solid waste, construction debris, demolition debris, business inventory, commercial goods, or goods for property other than the property where the storage unit is located or any illegal or hazardous material. Upon reasonable notice, the ZONING ADMINISTRATOR may inspect the contents of any temporary storage unit at any reasonable time to ensure compliance with these requirements. h. Any temporary storage unit which is not removed at the end of the time for which it may lawfully remain in place, may be removed by the TOWN immediately, without notice, and the violation shall be enforced in accordance with Article 22 of this ordinance. i. A SIGN identifying the storage unit supplier, mounted on the temporary storage unit, shall not require a SIGN permit; provided, the storage unit complies with the requirements of this subsection and all other applicable ordinances. Section 2.6 USEs A. Illegal Dwellings. The use of any floor area below BASE FLOOD ELEVATION for dwelling purposes is prohibited in all zoning districts unless the floor area meets the applicable BUILDING code requirements. BUILDINGs erected as GARAGEs or ACCESSORY BUILDINGs, except approved ACCESSORY DWELLING UNITs, shall not be occupied for dwelling purposes. 74 Town of Seabrook Island Development Standards Ordinance 27 B. PRINCIPAL USE. A LOT or parcel shall not be devoted to more than one (1) PRINCIPAL USE, or contain more than one (1) principal BUILDING; except for groups of multiple family BUILDINGs, TOWNHOMEs, business establishments, or other BUILDINGs which are determined by the ZONING ADMINISTRATOR to be a PRINCIPAL USE collectively, based on the following considerations: 1. individual BUILDINGs share common parking areas; 2. access to the BUILDINGs/uses is provided via shared access drives or streets; 3. BUILDINGs are under single ownership; 4. individual activities support one another (such as MARINA/convenience store or cycle rental/RETAIL sporting goods); or 5. The BUILDING or USE is located within the MU Mixed Use zoning district. C. Domestic Animals. 1. The keeping of household pets, including dogs, cats, fish, birds, hamsters, and other animals commonly considered household pets is permitted in any residential district; provided, no more than three (3) dogs or cats, six (6) months of age or older, in any combination shall be kept or housed in or at one (1) dwelling. 2. The keeping of animals not generally considered to be household pets, including, but not limited to, exotic animals and LIVESTOCK, horses, pigs, sheep, cattle, goats, and poultry is prohibited in all zoning districts, except within the AGR, RC and CSC Districts. D. Outdoor Storage. Outdoor storage of merchandise, equipment, supplies, products, or other materials shall only be permitted as a CONDITIONAL USE within those districts and under such conditions as specifically authorized by this ordinance. E. Parking, Storage, and REPAIR of Vehicles. 1. In order to prevent nuisance effects within the community including, but not limited to, noise, soil contamination, unsightly conditions, and diminution of property values, it shall be unlawful for the owner, tenant, or lessee of any BUILDING or land within the TOWN to permit the open storage or parking of any inoperable motor vehicle, machinery, or equipment, or parts thereof, outside of an enclosed GARAGE or enclosed BUILDING. Inoperable, for purposes of this subsection, shall mean motor vehicles, machinery, or equipment which, by reason of dismantling, disrepair, or other cause, are incapable of being propelled under their own power, operated or used, are unsafe for operation on the streets and highways of this state because of the inability to comply with the South Carolina Motor Vehicle Code, or do not have a current license and registration as required for operation by the South Carolina Motor Vehicle Code. 2. The REPAIR, restoration, and MAINTENANCE of vehicles in any district shall be conducted entirely within an enclosed BUILDING, except for vehicle cleaning, tire changing, or replacement of a battery. 75 Town of Seabrook Island Development Standards Ordinance 28 3. It shall be unlawful for the owner, tenant or lessee of any LOT or BUILDING in a residential district or on property containing a DWELLING UNIT to permit the open storage or parking outside of a BUILDING of semi-truck tractors and/or semi-truck trailers, box trucks, bulldozers, earth carriers, cranes, or any other similar equipment or machinery, unless parked for purposes of construction, MAINTENANCE, moving, or similar purpose being conducted on that LOT. F. RECREATIONAL VEHICLE Storage. RECREATIONAL VEHICLEs shall only be stored within areas specifically designated for that purpose as allowed by this ordinance. G. Similar Uses. Every type of potential use cannot be addressed in this ordinance, each district provides for "similar uses" referencing this section. All requests for a use not specifically addressed in any zoning district shall be submitted to the ZONING ADMINISTRATOR for review, based on the following standards. 1. A finding has been made by the ZONING ADMINISTRATOR that the proposed use is not listed as a permitted or CONDITIONAL USE in any zoning district. 2. If the use is not addressed in this ordinance, the ZONING ADMINISTRATOR shall select the use listed which most closely approximates the proposed use, using criteria such as the nature of the use, conformance with the purpose of the zoning district in which it is proposed, aesthetics, traffic characteristics, and potential nuisance effects including, but not limited to, noise, vibration, dust, smoke, odor, glare, and hours of operation). 3. Once a similar use is determined, the use shall comply with any conditions and review procedures that may apply to that use, including the CONDITIONAL USE requirements of Article 9, as applicable. 4. If the ZONING ADMINISTRATOR determines a proposed use is not similar to any use addressed in this ordinance, the applicant may petition TOWN COUNCIL for an amendment to this ordinance, as described in Article 19. 5. The determination as to whether a proposed use is similar in nature and class to another permitted or CONDITIONAL USE within a district shall be considered as an expansion of the use regulations, not a VARIANCE applying to a particular situation. Any use determined by the ZONING ADMINISTRATOR to be similar shall thereafter be included in the enumeration of the uses. H. Voting Place. The provisions of this ordinance shall not interfere with the temporary use of any property as a voting place in connection with a federal, state, county, municipal, or other public election. Section 2.7 Utilities and Services A. Essential Public Services. The erection, construction, alteration, or MAINTENANCE of essential public services shall be permitted in any zoning district and shall be exempt from the application of this ordinance; provided, BUILDINGs, parking areas, and other uses or STRUCTUREs accessory to the essential service shall not be exempt and shall conform to all applicable ordinance requirements and procedures. This provision, however, shall not be 76 Town of Seabrook Island Development Standards Ordinance 29 construed to waive the rights of the TOWN to require that specific services be installed underground. B. Water and Sanitary Sewer Service. No STRUCTURE for human occupancy shall, after the effective date of this ordinance, be erected, altered, or moved upon any LOT or premises and used, in whole or in part, for dwelling, business, industrial, institutional, or recreational purposes unless provided with a safe, sanitary, and potable water supply and with a safe and effective means of collection, treatment and disposal of human, domestic, commercial, and industrial waste. Such installations and facilities shall conform to the minimum requirements for such facilities as established by the State of South Carolina, Charleston County, the TOWN, and other relevant government codes, ordinances, and standards. C. Underground Storage Tanks. All underground storage tanks utilized for the storage of propane gas, oil, fuel, or other substances shall be secured in place by straps, bands, or other fastening devices sufficient to keep the tanks securely in place and to prevent them from rising above ground level. Any underground storage tank already in place at the time this ordinance is adopted shall be brought into compliance within two (2) years. Installing or allowing the installation of an underground tank in violation of this ordinance shall be a misdemeanor and prosecuted in accord with Article 22 of this ordinance. No underground storage tank shall be located closer than 25 feet to a CRITICAL AREA or WATERBODY. 77 Town of Seabrook Island Development Standards Ordinance 30 Article 3: Zoning Districts and Map ARTICLE 3 Zoning Districts and Map Town of Seabrook Island Development Standards Ordinance 78 Town of Seabrook Island Development Standards Ordinance 31 Section 3.1 Districts Established The following zoning districts are established by this ordinance: Table 3-1, Zone Districts Established Category Designation District Name Conservation / Recreation Districts CP Conservation AGR Agricultural RC Recreation CSC Camp St. Christopher Residential Districts R-SF1 Large LOT SINGLE-FAMILY R-SF2 Medium LOT SINGLE-FAMILY R-SF3 Small LOT SINGLE-FAMILY R-CL SINGLE-FAMILY Cluster R-TH TOWNHOME R-MF MULTI-FAMILY Support Districts LC Limited Commercial CF Community Facilities/Services Mixed Use Districts MU Mixed Use PD Planned Development OVERLAY DISTRICT SIR Seabrook Island Road Section 3.2 ZONING MAP A. General. The official ZONING MAP designates the location and boundaries of the various districts established in this ordinance within the TOWN. The official ZONING MAP shall be kept on file in the office of the ZONING ADMINISTRATOR and be available for public inspection during normal business hours. The original official version of the map shall be identified by the signature of the mayor and attested by the TOWN clerk. Copies of the map may be kept in hardcopy and digital form. The official ZONING MAP, together with any amendments approved pursuant to Article 19, but not yet incorporated into the map, shall be the final authority as to the status of the current zone district classification of all land within the TOWN. B. Amendments. The TOWN COUNCIL may, at its discretion or upon formal application, amend the ZONING MAP, in accordance with the amendment procedures of Article 19. Section 3.3 District Boundaries Interpreted A. Boundaries indicated as approximately following the centerline of streets, highways, or alleys shall be construed to follow such centerlines. B. Boundaries indicated as approximately following platted lot lines shall be construed as following such lot lines. C. Boundaries indicated as approximately following TOWN boundaries shall be construed as following TOWN boundaries. D. Boundaries indicated as approximately following the centerline of creeks, streams or rivers shall be construed as following such creeks, streams, or rivers, or in the event of change in the 79 Town of Seabrook Island Development Standards Ordinance 32 location of creeks, streams, or rivers, shall be construed as moving with the creek, stream, or river. E. Boundaries indicated as approximately following the edge of a marsh or the SCDHEC- OCRMSCDES-BCM CRITICAL LINE shall be construed as following that marsh or SCDHEC- OCRMSCDES-BCM CRITICAL LINE, or in the event of change in location of that marsh edge or CRITICAL LINE, shall be construed as moving with the marsh edge or CRITICAL LINE. F. Boundaries indicated as approximately following property lines, section lines or other lines of government survey shall be construed as following such property lines, section lines, or other lines of government survey as they exist as of the effective date of this ordinance or applicable amendments thereto. Section 3.4 LOTs Divided by a Zoning Line Where a zoning line divides a LOT or where two (2) LOTs in different districts are combined, the entire LOT shall be considered to be wholly within the less intense zoning district. Where two (2) LOTs are combined and one of the LOTs is within an OVERLAY DISTRICT, the entire LOT shall be considered to be wholly within the OVERLAY DISTRICT. Table 2-1 lists districts from least intense to most intense. Section 3.5 Zoning of Vacated Areas Whenever any street, alley, or other public way within the TOWN is vacated by official governmental action, and when the lands within those vacated lands attach to and become a part of lands adjoining the street, alley, or public way, those lands shall automatically be subjected to the same zoning regulations as are applicable to the adjoining lands. Section 3.6 Zoning of Annexed Property Each annexation petition shall be accompanied by an application for ZONING MAP amendment. The purpose of the ZONING MAP amendment is to amend the official ZONING MAP of the TOWN to assign a zoning designation to the subject property upon its annexation into the corporate limits of the TOWN. The ZONING MAP amendment shall be considered concurrently with the annexation petition; provided, the ZONING MAP amendment shall be processed and considered in accordance with the provisions set forth in Article 19 of this ordinance.When land is annexed into the TOWN, its zoning designation shall be as established by the annexation ordinance. In instances when the zoning designation of land annexed into the TOWN is not established by the annexation ordinance, it shall be zoned R-SF1 until or unless the TOWN COUNCIL takes action to classify it as another zone district. 80 Town of Seabrook Island Development Standards Ordinance 33 Article 4: Conservation/Recreation Districts ARTICLE 4 Conservation / Recreation Districts Town of Seabrook Island Development Standards Ordinance 81 Town of Seabrook Island Development Standards Ordinance 34 Section 4.1 Purpose A. CP, Conservation District. This district is established for the purpose of protecting and conserving CRITICAL AREAS and WETLANDs, wildlife habitats, other sensitive environmental areas, and those areas otherwise encumbered by conservation EASEMENTs. In addition, all areas within the corporate limits of the TOWN lying seaward of the SCDHEC-OCRMSCDES- BCM CRITICAL LINE are included. B. AGR, Agricultural District. The purpose of this district is to provide for and protect traditional, low intensity agricultural, farming, and recreational activities, together with very low-density single-family residential development. C. RC, Recreation District. This district provides for designated active and passive leisure amenities, both public and private, that contribute to the enjoyment and relaxation of life on Seabrook Island. D. CSC, Camp St. Christopher District. This district is established to preserve the historically significant and environmentally sensitive property occupied by the non-profit camp and conference center and to support its continued operation. The district allows those uses that currently exist, along with others that may be added in support of the camp’s mission and are commonly associated with such facilities, but not including for-profit commercial uses. Section 4.2 Schedule of Uses BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs in the districts indicated at the top of Table 4-2 may be used for the purposes denoted by the following abbreviations: A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right. B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right, provided the specific conditions related to that use, as found in Article 9 are met. C. Specific Conditions. Indicates the relevant section outlining the specific requirements or conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the general criteria of Section 9.3. 82 Town of Seabrook Island Development Standards Ordinance 35 Table 4-2 Schedule of Uses: Conservation/Recreation Districts USE CP AGR RC CSC Specific Conditions ACCESSORY USEs ACCESSORY USEs and STRUCTUREs P P P P Agriculture and Conservation Agriculture P Bulkhead and EROSION control devices P P P P Community gardens P P P P Open space preserves such as WETLANDs and wildlife habitat refuge areas P P P P Entertainment, Hospitality, and Leisure Boat docks, landings and launches P Classroom and lecture facilities P Community swimming pools P Dormitories, cabins, and cafeterias for campers and conference attendees, not including for-profit HOTELs P Equestrian facilities P P P Fitness club/health spa P P Golf course/country club, including ACCESSORY USEs such as MAINTENANCE facilities, pro shops, lounges, banquet facilities, and RESTAURANTs. P P Greenways, boardwalks, and non- motorized trails/pathways P P P P Gymnasium and indoor recreation facilities P P P MARINA C Section 9.4 H OPEN AIR RECREATION uses C C C C Section 9.4 I Office Government offices P Residential ACCESSORY DWELLING UNITs C Section 9.4 A HOME OCCUPATIONs C Section 9.4 F SHORT-TERM RENTAL UNITs C Section 9.4 O SINGLE-FAMILY DWELLINGs P VACATION CLUB UNIT C Section 9.4 Q Services Cemetery P PLACES OF PUBLIC WORSHIP P UTILITY substation or subinstallation C C C Section 9.4 P Wireless communication antennas or towers C C Section 9.4 T Other Similar Uses C C C C Section 2.6 G 83 Town of Seabrook Island Development Standards Ordinance 36 Section 4.3 Spatial Requirements A. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 4-3. New LOTs shall not be created, except in conformance with these requirements. Table 4-3. LOT and Width Requirements, Conservation/Recreation Districts Zoning District Minimum LOT AREA (sq. ft) Minimum LOT WIDTH (ft.) Maximum Residential Density (units/acre) CP - - - AGR 5 acres - 0.2 RC - - - CSC 250 acres - - B. All STRUCTUREs and their placement on a LOT shall conform to the minimum dimensional requirements listed in Table 4-3a. Table 4-3a. Dimensional Requirements, Conservation/Recreation Districts Zoning District Maximum BUILDING HEIGHT (ft./stories) Minimum Yard SETBACKs (ft.) Front Side Rear Parking BUILDING CP 36 50 50 30 50 AGR No max. for farm buildings; 36 for all other uses 100 100 50 50 RC 36 30 20 20 30 CSC 36 305 305 5 5 5 Front setbacks shall only apply along perimeter streets, not including interior streets within a development. No minimum SIDE YARD shall be required; provided, a minimum separation distance of 15 feet shall be maintained between all buildings. No REAR YARD shall be required; provided, a minimum setback of 20 feet shall be required from the development’s perimeter property boundary. 84 Town of Seabrook Island Development Standards Ordinance 37 Section 4.4 Site Development Regulations In addition to the requirements of this article, all DEVELOPMENT in the Conservation/Recreation Districts shall meet the applicable requirements as listed elsewhere in this ordinance: A. General Provisions – Article 2 B. Overlay Districts – Article 8 B.C. CONDITIONAL USE Requirements – Article 9 C.D. Environmental Performance Standards – Article 10 D.E. Trees, Landscaping and BUFFERing – Article 11 E.F. Parking and Loading – Article 12 F.G. SIGNs – Article 13 G.H. Site Plan Review – Article 14 85 Town of Seabrook Island Development Standards Ordinance 38 Article 5: Residential Districts ARTICLE 5 Residential Districts Town of Seabrook Island Development Standards Ordinance 86 Town of Seabrook Island Development Standards Ordinance 39 Section 5.1 Purpose The purposes of the residential districts, in general, are to: provide for quiet, low-density residential neighborhoods; discourage unwarranted encroachment by regulating commercial and other uses which would interfere with the development or continuation of residential uses; minimize nonconformities; and discourage uses which would generate traffic on minor streets other than required to serve residences on those streets. A. R-SF1, Large LOT SINGLE-FAMILY. This district is created to retain the character of established large-LOT SINGLE-FAMILY neighborhoods and to provide a district that would allow for the creation of future estate-sized home sites. Other uses are also permitted that are compatible with and supportive of the character of the homes in this district. B. R-SF2, Moderate LOT SINGLE-FAMILY. It is the purpose of this district to encompass those early SUBDIVISIONs that were developed prior to the incorporation of the TOWN and to establish DEVELOPMENT standards based on the existing moderate density conditions that will minimize nonconformities to the extent practical. Other uses are also permitted that are compatible with, and supportive of, the character of the homes in this district. C. R-SF3, Small LOT SINGLE-FAMILY. This district is intended to support established DEVELOPMENT patterns of those existing SUBDIVISIONs containing SINGLE-FAMILY homes on small LOTs and to reduce existing nonconformities to the extent practical. D. R-CL, SINGLE-FAMILY Cluster. This district is intended to accommodate SINGLE-FAMILY detached dwellings which are situated in a “cluster” style arrangement within a PLANNED COMMUNITY, rather than on traditional SINGLE-FAMILY LOTs, and to provide greater flexibility for their IMPROVEMENT and expansion. E. R-TH, TOWNHOME. This district is established specifically to accommodate TOWNHOME DEVELOPMENT at a reasonable density to afford an alternate form of residence within the community. F. R-MF, MULTI-FAMILY. This district is intended to support MULTI-FAMILY dwellings, including CONDOMINIUMs and apartments, at moderate density as another residential option within the community. Section 5.2 Schedule of Uses BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs in the districts indicated at the top of Table 5-2 may be used for the purposes denoted by the following abbreviations: A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right. B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right, provided the specific conditions related to that use, as found in Article 9, are met. 87 Town of Seabrook Island Development Standards Ordinance 40 C. Specific Conditions. Indicates the relevant section outlining the specific requirements or conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the general criteria of Section 9.3. Table 5-2 Schedule of Uses: Residential Districts USE R-SF1 R-SF2 R-SF3 R-CL R-TH R-MF Specific Conditions ACCESSORY USEs ACCESSORY USEs and STRUCTUREs P P P P P P Agriculture and Conservation Open space preserves such as WETLANDs and wildlife habitat refuge areas P P P P P P Entertainment, Hospitality, and Leisure Greenways, boardwalks, and non-motorized trails/pathways P P P P P P Non-commercial community or neighborhood activity uses such as, park/playground, swimming pool, storage STRUCTUREs, and off-street parking p p p p p p Residential ACCESSORY DWELLING UNITs C C Section 9.4 A HOME OCCUPATIONs C C C C C C Section 9.4 F SHORT-TERM RENTAL UNITs C C C C C C Section 9.4 O MULTI-FAMILY DWELLINGs P SINGLE-FAMILY DWELLINGs P P P P TOWNHOMEs P TWO-FAMILY DWELLINGs P VACATION CLUB UNIT C C C C C C Section 9.4 Q Services UTILITY substation or subinstallation C C C C C C Section 9.4 P Other Similar Uses C C C C C C Section 2.6 G Section 5.3 Spatial Requirements A. Area and Width. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 5-3 based on the date on which they were recorded. 88 Town of Seabrook Island Development Standards Ordinance 41 Table 5-3. LOT and Width Requirements for LOTs Recorded Prior to or After July 1, 2022 Zoning District Lots Recorded Prior to July 1, 2022 Lots Recorded On/After July 1, 2022 Minimum LOT AREA (sq. Ft.) Minimum LOT WIDTH (ft.) Maximum Density (units/acre) Minimum LOT AREA (sq. Ft.) Minimum LOT WIDTH (ft.) Maximum Density (units/acre) R-SF1 32,670 100 1 65,3406,7 1256,7 0.6 R-SF2 17,500 85 2 21,7807 857 2 R-SF3 6,000 45 5 10,8907 457 4 R-CL 2 acres8 - 89 5 acres8 - 59 R-TH 2 acres8,10 - 149 5 acres8,10 - 79 R-MF 2 acres8 - 209 5 acres8 - 129 B. SETBACKs and Related Standards. All STRUCTUREs and their placement on a LOT recorded prior to the adoption of this ordinance shall conform to the minimum dimensional requirements listed in Table 5-3a. STRUCTUREs erected on new LOTs, recorded on or after the adoption of this ordinance, shall conform with the requirements of Table 5-3b. 6 The spatial requirements for R-SF1-zoned LOTs developed as part of a CONSERVATION SUBDIVISION shall be as provided in Section 5.4. 7 Any LOT which was created by the combination of two or more smaller LOTS by PLAT recorded prior to July 1, 2022, may be re-subdivided on or after July 1, 2022, even if the resulting LOTs do not conform to the minimum LOT AREA and/or LOT WIDTH requirements specified herein, provided: 1) the property line(s) may only be re- established in the same location(s) that existed immediately prior to the combination; and 2) no BUILDING, STRUCTURE, or other site IMPROVEMENT may be made nonconforming with the current SETBACK or LOT COVERAGE requirements as a result of the re-subdivision. 8 Minimum acreage applies to the GROSS ACREAGE of the development parcel. 9 Maximum density for CLUSTER UNITS, townhomes, and multiple family shall be calculated based on NET ACREAGE. 10 Minimum LOT AREA and width for a two-family dwelling shall be the same as required for R-SF2. 89 Town of Seabrook Island Development Standards Ordinance 42 Table 5-3a. Dimensional Requirements for LOTs Recorded Prior to July 1, 2022 Zoning District Maximum BUILDING HEIGHT (ft.) Minimum Yard SETBACKs (ft.) LOT COVERAGE (%) Min. Floor Area11 (sq. ft.) Front Side Rear Park’g. Bldg.12 Min. Sep. R-SF1 36 - 30 15 - 25 35 1,200 R-SF2 36 - 30 1513 - 25 40 1,000 R-SF3 36 - 3014 7.515 1515 25 50 850 R-CL 36 - 2016 - 1515 17 40 11 R-TH 36 2016 2016 - 1515 17 50 11 R-MF 36 2016 3016 - 1515 17 60 11 Table 5-3b. Dimensional Requirements for LOTs Recorded On/After July 1, 2022 Zoning District Maximum BUILDING HEIGHT (ft.) Minimum Yard SETBACKs (ft.) LOT COVERAGE (%) Min. Floor Area11 (sq. ft.) Front Side Rear Park’g . Bldg.12 Min. Sep. R-SF1 36 - 506 256 - 506 256 1,500 R-SF2 36 - 30 15 - 25 40 1,000 R-SF3 36 - 30 7.5 - 25 50 850 R-CL 36 - 3016 - 2518 19 40 11 R-TH 36 2016 3016 - 2518 19 50 11 R-MF 36 2016 3016 - 2518 19 60 11 11 Minimum LIVABLE FLOOR AREA requirements are for single family detached dwellings in the R-SF1, R-SF2, and R-SF3 districts. The minimum required LIVABLE FLOOR AREA for units in the R-CL, R-TH and R-MF districts shall be determined by the number of bedrooms, as follows: efficiency unit – 650, 1 bedroom – 800, 2 bedroom – 1,000, 3 bedroom – 1,200. An additional 100 square feet shall be provided for each bedroom over 3. 12 Average established setback shall apply, as applicable, in R-SF1, R-SF2, and R-SF3 Districts, per Section 5.3 C. 13 For lots with less than 13,500 square feet of HIGH GROUND, the minimum SIDE YARD SETBACK shall be 10 feet. For lots with greater than 13,500 square feet, but less than 17,500 square feet, of HIGH GROUND, the minimum SIDE YARD SETBACK shall be 12.5 feet. 14 Where a LOT zoned R-SF3 fronts two intersecting streets wherein one street contains a CUL-DE-SAC, the required FRONT YARD SETBACK from the street containing the CUL-DE-SAC shall be 30 feet, and the required FRONT YARD SETBACK from the street which does not contain the CUL-DE-SAC shall be 20 feet. 15 In instances where an existing structure on a neighboring lot is situated less than 7.5 feet from the shared property line in the R-SF3 district, a larger SIDE YARD SETBACK shall be required in order to ensure a minimum separation of at least 15 feet between structures. In the R-CL, R-TH and R-MF districts, no minimum SIDE YARD shall be required; provided, a minimum separation distance of 15 feet shall be maintained between all buildings. 16 Front setbacks shall only apply along perimeter streets, not including interior streets within a DEVELOPMENT. 17 No REAR YARD shall be required; provided, a minimum SETBACK of 20 feet shall be required from the DEVELOPMENT’s perimeter property boundary. 18 No minimum SIDE YARD shall be required; provided, a minimum separation distance of 25 feet shall be maintained between all buildings. 19 No REAR YARD shall be required; provided, a minimum setback of 30 feet shall be required from the development’s perimeter property boundary. 90 Town of Seabrook Island Development Standards Ordinance 43 91 Town of Seabrook Island Development Standards Ordinance 44 Section 5.4 CONSERVATION SUBDIVISIONS A. Purpose. The purpose of this section is to encourage the voluntary preservation of OPEN SPACE by permitting limited design flexibility for new residential DEVELOPMENT within designated zoning districts. This section is intended to: 1. Provide for the permanent preservation of OPEN SPACE; 2. Permit flexibility of design in order to promote environmentally sensitive design and the efficient use of land; 3. Preserve unique or sensitive natural resources such as groundwater, floodplains, WETLANDS, streams, steep slopes, woodlands, and wildlife habitats; 4. Permit the clustering of dwellings and accessory structures, at densities consistent with neighboring DEVELOPMENT, to reduce the amount of infrastructure, including paved surfaces and utility easements, necessary for residential development; 5. Reduce erosion and sedimentation by minimizing land disturbance and removal of vegetation in residential development; and 6. Conserve scenic views and reduce perceived density. B. General Requirements. 1. Applicability. The CONSERVATION SUBDIVISION is an available option, though not a requirement, for new residential DEVELOPMENT within the R-SF1 zoning district. 2. Size and ownership requirements. Any property which is proposed to be subdivided as a CONSERVATION SUBDIVISION must contain a minimum of ten (10) contiguous acres of HIGH GROUND. The land may be held in single and separate ownership or in multiple ownership. If held in multiple ownership, the site shall be developed according to a single plan with common authority and common responsibility. 3. Minimum OPEN SPACE required. To qualify as a CONSERVATION SUBDIVISION, at least twenty-five percent (25%) of the developable HIGH GROUND shall be preserved as OPEN SPACE pursuant to the provisions of this section. C. Procedures. 1. Review and approval. All requests to develop a CONSERVATION SUBDIVISION shall be reviewed and approved by the Planning Commission, pursuant to the requirements of this section and those specified in Article 15. 2. Plan required. Any PERSON seeking to subdivide property as a CONSERVATION SUBDIVISION shall prepare and submit an OPEN SPACE plan concurrent with the application for a preliminary PLAT. The OPEN SPACE plan shall include the following: a. Dedicated OPEN SPACE shall be shown on the preliminary PLAT and shall be labeled to specify that the land is to be permanently dedicated as OPEN SPACE. For purposes 92 Town of Seabrook Island Development Standards Ordinance 45 of this section, credit shall be granted only for developable HIGH GROUND which is dedicated as OPEN SPACE. b. As a condition of approval, the applicant shall specify how the dedicated OPEN SPACE shall be conveyed. The conveyance may be trough any of the following means, subject to approval by the PLANNING COMMISSION: i. Deeded in perpetuity to the TOWN, subject to prior approval by TOWN COUNCIL; ii. Reserved for common use or ownership of all property owners within the DEVELOPMENT by covenants in the deeds approved by the TOWN attorney. A final copy of the proposed covenants shall be submitted with the application for final PLAT approval; iii. Deeded in perpetuity to a private, non-profit, tax-exempt organization legally constituted for conservation purposes under terms and conditions that ensure the perpetual protection and management of the property for conservation purposes. A copy of the proposed deed and relevant corporate documents of the land trust shall be submitted with the application for final PLAT approval; iv. Deeded to a property owner's association or REGIME within the DEVELOPMENT upon terms and conditions approved by the TOWN attorney that will ensure the continued use and management of the land for the intended purposes. If this option is selected, the formation and incorporation by the applicant of one or more appropriate property owners' associations or REGIMEs shall be required prior to approval. A copy of the proposed property owner's deed and the by-laws and other relevant documents of the property owner's association or REGIME shall be submitted with the application for final PLAT approval. The following shall be required if OPEN SPACE is to be dedicated to a property owners' association or REGIME: (a) Covenants providing for mandatory membership in the association/REGIME and setting forth the owner's rights, interests, and privileges in the association and the common land, must be included in the deed for each LOT or unit; (b) The property owners' association or REGIME shall have the responsibility of maintaining the OPEN SPACE and shall operate and maintain any recreational facilities which may be provided within the OPEN SPACE; (c) The association or REGIME shall have the authority to levy charges against all property owners to defray the expenses connected with the operation and MAINTENANCE of OPEN SPACE and recreational facilities; and (d) The applicant shall maintain control of dedicated OPEN SPACE and be responsible for its MAINTENANCE until DEVELOPMENT sufficient to support the association or REGIME has taken place. 93 Town of Seabrook Island Development Standards Ordinance 46 3. OPEN SPACE to be dedicated to the TOWN shall have shape, dimension, character, location, and topography to ensure appropriate access and usability, and to accomplish at least two (2) of the following OPEN SPACE purposes: a. natural resource conservation, b. WETLAND and water course conservation, c. selective forestry, d. wildlife habitat, e. recreation, f. civic purposes, or g. scenic preservation. 4. Dedicated OPEN SPACE features that are not dedicated to the TOWN may be open to the public or restricted to the residents or property owners within the DEVELOPMENT. 5. All approved OPEN SPACE shall be dedicated in accordance with the provisions of this section, and as approved by PLANNING COMMISSION, prior to commencing any construction, regardless of whether or not the project will be completed in phases. D. Spatial Requirements for CONSERVATION SUBDIVISIONS. 1. Standards. The following spatial requirements shall apply to all LOTs created on or after July 1, 2022, within a duly authorized CONSERVATION SUBDIVISION: Table 5-4. Spatial Requirements for CONSERVATION SUBDIVISION LOTs Maximum Density The maximum NET DENSITY of any CONSERVATION SUBDIVISION shall not exceed 0.6 dwelling units per acre, multiplied by the total acreage of HIGH GROUND within the DEVELOPMENT. Any calculation which results in a fraction shall be rounded down to the nearest whole number. Minimum LOT AREA 65,340 sf (1.5 acre). The minimum LOT AREA specified herein may be reduced by one percent (1%) for each one percent (1%) of HIGH GROUND within the DEVELOPMENT which is dedicated as OPEN SPACE; provided, the minimum LOT AREA shall not be less than 32,670 square feet (0.75 acre) Minimum LOT WIDTH If min. LOT AREA is 43,560 sf (1 acre) or more 125 If min. LOT AREA is less than 43,560 sf (1 acre) 100 Minimum YARD SETBACKS If min. LOT AREA is 43,560 sf (1 acre) or more Front 50 Side 25 Rear 50 If min. LOT AREA is less than 43,560 sf (1 acre) Front 30 Side 15 Rear 25 Maximum LOT COVERAGE (%) If min. LOT AREA is 43,560 sf (1 acre) or more 35 If min. LOT AREA is less than 43,560 sf (1 acre) 30 94 Town of Seabrook Island Development Standards Ordinance 47 2. Other requirements. Except for those modifications expressly authorized herein, the applicant shall comply with all other provisions of this ordinance, including, specifically, all other requirements of Tables 5-3 and 5-3b, and all other applicable laws and regulations, except those which are incompatible with the provisions contained herein. Section 5.5 Site Development Regulations In addition to the requirements of this article, all DEVELOPMENT in the Residential Districts shall meet the applicable requirements as listed elsewhere in this ordinance: A. General Provisions – Article 2 B. Overlay Districts – Article 8 B.C. CONDITIONAL USE Requirements – Article 9 C.D. Environmental Performance Standards – Article 10 D.E. Trees, Landscaping and BUFFERing – Article 11 E.F. Parking and Loading – Article 12 F.G. SIGNs – Article 13 G.H. Site Plan Review – Article 14 95 Town of Seabrook Island Development Standards Ordinance 48 Article 6: Support Districts ARTICLE 6 Support Districts Town of Seabrook Island Development Standards Ordinance 96 Town of Seabrook Island Development Standards Ordinance 49 Section 6.1 Purpose A. CF, Community Facilities District. It is the purpose of this district to provide suitable locations for those facilities that generally comprise the public and quasi-public infrastructure for the community. B. LC, Limited Commercial District. This district is intended to provide a concentrated location for various businesses of a type, scale, and character that are in harmony with the residential nature of the Seabrook Island community and support the daily needs of its residents and visitors. Section 6.2 Schedule of Uses BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs in the districts indicated at the top of Table 6-2 may be used for the purposes denoted by the following abbreviations: A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right. B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right, provided the specific conditions related to that use, as found in Article 9 are met. C. Specific Conditions. Indicates the relevant section outlining the specific requirements or conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the general criteria of Section 9.3. Table 6-2 Schedule of Uses: Support Districts USE LC CF Specific Conditions ACCESSORY USEs ACCESSORY USEs and STRUCTUREs P P Drive-in and drive-through facilities for automated teller machines, banks, pharmacies, and similar uses (not including DRIVE-THROUGH RESTAURANTs) C Section 9.4 B Outdoor display areas for RETAIL ESTABLISHMENTs C Section 9.4 J Outdoor seating at eating/drinking establishments C Section 9.4 K Outdoor storage facilities C Section 9.4 L Entertainment, Hospitality, and Leisure Boat docks, landings and launches P Classroom and lecture facilities P Community swimming pools P Establishments serving alcoholic beverages C Section 9.4 D Fitness club/health spa P Greenways, boardwalks, and non-motorized trails/pathways P P Gymnasium and indoor recreation facilities P P HOTELs P MARINA C C Section 9.4 H 97 Town of Seabrook Island Development Standards Ordinance 50 Non-commercial community or neighborhood activity uses such as, park/playground, swimming pool, storage STRUCTUREs, and off-street parking P OPEN AIR RECREATION uses P Section 9.4 I RESTAURANTs (not including DRIVE-THROUGH facilities) P Office Banks, savings & loans, and similar financial institutions P Government offices P P Medical, dental or chiropractic office, including clinics and/or laboratory P Offices, general and professional P Veterinary offices and clinics C Section 9.4 R RETAIL Establishments, not exceeding 5,000 square feet, selling goods at RETAIL within a fully enclosed BUILDING P Establishments larger than 5,000 square feet but not more than 10,000 square feet, selling goods at RETAIL within a fully enclosed BUILDING C Section 9.4 N Services Helipad C Section 9.4 E KENNELs C Section 9.4 G Government facilities, including storage and MAINTENANCE facilities P P PERSONAL SERVICEs P Photographic studios P PLACES OF PUBLIC WORSHIP P RECREATIONAL VEHICLE storage C C Section 9.4 M UTILITY substation or subinstallation C C Section 9.4 P Water or wastewater treatment facilities C Section 9.4 S Wireless communication antennas or towers C C Section 9.4 T Other Similar Uses C C Section 2.6 G Section 6.3 Spatial Requirements A. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 6-3. New LOTs shall not be created, except in conformance with these requirements. Table 6-3. LOT and Width Requirements, Support Districts Zoning District Minimum Area Minimum Width (ft.) LC 15,000 80 CF 15,000 80 B. All STRUCTUREs and their placement on a LOT shall conform to the minimum dimensional requirements listed in Table 6-3a. 98 Town of Seabrook Island Development Standards Ordinance 51 Table 6-3a. Dimensional Requirements, Support Districts Zoning District Maximum BUILDING HEIGHT (ft./stories) Minimum Yard SETBACKs (ft.) Front Side Rear Parking BUILDING LC 36 20 30 15 30 CF 36 - 30 - - Section 6.4 Site Development Regulations In addition to the requirements of this article, all DEVELOPMENT in the LC and CF Districts shall meet the applicable requirements as listed elsewhere in this ordinance: A. General Provisions – Article 2 B. Overlay Districts – Article 8 B.C. CONDITIONAL USE Requirements – Article 9 C.D. Environmental Performance Standards – Article 10 20 Parking shall not be permitted within the required FRONT YARD. 99 Town of Seabrook Island Development Standards Ordinance 52 D.E. Trees, Landscaping and BUFFERing – Article 11 E.F. Parking and Loading – Article 12 F.G. SIGNs – Article 13 G.H. Site Plan Review – Article 14 100 Town of Seabrook Island Development Standards Ordinance 53 Article 7: Mixed Use Districts ARTICLE 7 Mixed-Use Districts Town of Seabrook Island Development Standards Ordinance 101 Town of Seabrook Island Development Standards Ordinance 54 Section 7.1 PurposeMixed Use (MU) District A. Purpose. The Mixed Use (MU) district is established for the purpose of offering a tool that permits a combination of residential and non-RESIDENTIAL USEs within a cohesive integrated DEVELOPMENT. A variety of housing types is encouraged at moderate densities, along with complementary office, RETAIL, and service uses in scale with the character of the district and surrounding area. Size limits are imposed to ensure that NONRESIDENTIAL USEs remain appropriate to the district intent. B. Schedule of Uses. BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs in the districts indicated at the top of Table 7-1 may be used for the purposes denoted by the following abbreviations: 1. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right. 2. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right, provided the specific conditions related to that use, as found in Article 9 are met. 3. Specific Conditions. Indicates the relevant section listing the requirements or conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the general criteria of Section 9.3. Table 7-1 Schedule of Uses: Mixed-Use District USE MU Specific Conditions ACCESSORY USEs ACCESSORY USEs and STRUCTUREs P Drive-in and drive-through facilities for automated teller machines, banks, pharmacies, and similar uses (not including DRIVE-THROUGH RESTAURANTs) C Section 9.4 B Outdoor display areas for RETAIL ESTABLISHMENTs C Section 9.4 J Outdoor seating at eating/drinking establishments C Section 9.4 K Outdoor storage facilities C Section 9.4 L Agriculture and Conservation Bulkhead and EROSION control devices P Community gardens P Open space preserves such as WETLANDs and wildlife habitat refuge areas P Entertainment, Hospitality, and Leisure Boat docks, landings and launches P Classroom and lecture facilities P Establishments serving alcoholic beverages C Section 9.4 D Fitness club/health spa P Greenways, boardwalks, and non-motorized trails/pathways P Gymnasium and indoor recreation facilities P HOTELs P MARINA C Section 9.4 H 102 Town of Seabrook Island Development Standards Ordinance 55 Non-commercial community or neighborhood activity uses such as, park/playground, swimming pool, storage STRUCTUREs, and off-street parking P OPEN AIR RECREATION uses P Section 9.4 I RESTAURANTs (not including DRIVE-THROUGH facilities) P Office Banks, savings & loans, and similar financial institutions P Government offices P Medical, dental or chiropractic office, including clinics and/or laboratory P Offices, general and professional P Residential DWELLINGS on upper floors above businesses C Section 9.4 C HOME OCCUPATIONs C Section 9.4 F SHORT-TERM RENTAL UNITs C Section 9.4 O MULTI-FAMILY DWELLINGs P SINGLE-FAMILY DWELLINGs P TOWNHOMEs P TWO-FAMILY DWELLINGs P VACATION CLUB UNIT C Section 9.4 Q RETAIL Establishments, not exceeding 5,000 square feet, selling goods at RETAIL within a fully enclosed BUILDING P Establishments larger than 5,000 square feet but not more than 10,000 square feet, selling goods at RETAIL within a fully enclosed BUILDING C Section 9.4 N Services Government facilities, including storage and MAINTENANCE facilities P PERSONAL SERVICEs P Photographic studios P PLACES OF PUBLIC WORSHIP P UTILITY substation or subinstallation C Section 9.4 P Wireless communication antennas or towers C Section 9.4 T Other Similar Uses C Section 2.6 G C. Spatial Requirements 1. Area and Density. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 7-1a. New LOTs shall not be created, except in conformance with these requirements. 103 Town of Seabrook Island Development Standards Ordinance 56 Table 7-1a. LOT AREA, Width, and Density Requirements, Mixed-Use District Zoning District Size Area Occupied by Non-RESIDENTIAL USES (%) Min. Width (ft.) Density (max. units/ NET Resid. ACRE Project Area (acres) Minimum Min. OPEN SPACE (%) Minimum Maximum MU 5 20 20 50 200 15 2. Density Bonus. A residential density bonus over and above the density otherwise allowed in the mixed-use district may be approved by TOWN COUNCIL provided the applicant increases the percentage of the total project area dedicated for OPEN SPACE. This bonus may be granted only if specifically requested by the applicant. Such bonus shall consist of an additional one (1) unit per NET ACRE of allowable density for every additional five (5) percent of HIGH GROUND land area devoted to dedicated OPEN SPACE beyond the minimum requirement; provided, the maximum bonus shall not exceed an additional five (5) units per NET ACRE. 3. SETBACKs. All STRUCTUREs and their placement on a LOT shall conform to the minimum dimensional requirements listed in Table 7-1b. Table 7-1b. Dimensional Requirements, Mixed-Use District Zoning District Maximum BUILDING HEIGHT (ft./stories) Minimum Yard SETBACKs (ft.)21 Front Side Rear Parking BUILDING MU 36 20 20 20 40 4. OPEN SPACE. Dedicated OPEN SPACE shall be provided in accordance with the following standards: a. A minimum 20 percent of the gross land area, as specified in Table 7-1, shall be dedicated OPEN SPACE. b. Dedicated OPEN SPACE shall be shown on the concept plan and preliminary PLAT, if applicable, and shall be labeled to specify that the land is to be dedicated for OPEN SPACE purposes. The OPEN SPACE land is to be permanently reserved for OPEN SPACE purposes. The applicant shall convey the dedicated OPEN SPACE as a condition of approval through any of the following means, as approved by the TOWN COUNCIL: i. Deeded in perpetuity to the TOWN; ii. Reserved for common use or ownership of all property owners within the DEVELOPMENT by covenants in the deeds approved by the TOWN attorney. A 21 Setbacks apply to the perimeter boundary of the project area. Individual setbacks within the mixed-use development shall be determined during the development plan review process, based on the setback requirements for the zoning district corresponding with the proposed use. 104 Town of Seabrook Island Development Standards Ordinance 57 copy of the proposed covenants shall be submitted with the application for final site plan approval; iii. Deeded in perpetuity to a private, non-profit, tax-exempt organization legally constituted for conservation purposes under terms and conditions that ensure the perpetual protection and management of the property for conservation purposes. A copy of the proposed deed and relevant corporate documents of the land trust shall be submitted with the final site plan application; iv. Deeded to a property owner's association or REGIME within the DEVELOPMENT upon terms and conditions approved by the TOWN attorney that will ensure the continued use and management of the land for the intended purposes. If this option is selected, the formation and incorporation by the applicant of one or more appropriate property owners' associations or REGIMEs shall be required prior to approval. A copy of the proposed property owner's deed and the by-laws and other relevant documents of the property owner's association or REGIME shall be submitted with the final site plan application. The following shall be required if OPEN SPACE is to be dedicated to a property owners' association or REGIME: (a) Covenants providing for mandatory membership in the association/REGIME and setting forth the owner's rights, interests, and privileges in the association and the common land, must be included in the deed for each LOT or unit; (b) The property owners' association or REGIME shall have the responsibility of maintaining the OPEN SPACE and shall operate and maintain any recreational facilities which may be provided within the OPEN SPACE; (c) The association or REGIME shall have the authority to levy charges against all property owners to defray the expenses connected with the operation and MAINTENANCE of OPEN SPACE and recreational facilities; and (d) The applicant shall maintain control of dedicated OPEN SPACE and be responsible for its MAINTENANCE until DEVELOPMENT sufficient to support the association or REGIME has taken place. c. OPEN SPACE to be dedicated to the TOWN shall have shape, dimension, character, location, and topography to ensure appropriate public access and usability, and to accomplish at least two (2) of the following OPEN SPACE purposes: i. natural resource conservation, ii. WETLAND and water course conservation, iii. selective forestry, iv. wildlife habitat, v. recreation, vi. civic purposes, or 105 Town of Seabrook Island Development Standards Ordinance 58 vii. scenic preservation. d. Dedicated OPEN SPACE features that are not dedicated to the TOWN may be open to the general public or restricted to the residents or property owners within the DEVELOPMENT. e. Streets, sidewalks, PARKING LOTs and other IMPERVIOUS SURFACEs shall be excluded from the calculation of required OPEN SPACE. However, lands occupied by bike paths, tennis courts, or similar common recreational amenities may be counted as dedicated OPEN SPACE; provided, such IMPERVIOUS SURFACEs shall not constitute more than 10 percent of the total required OPEN SPACE. f. Up to 50 percent of the dedicated OPEN SPACE requirement may be satisfied with land covered by water or by stormwater detention or retention basins if the TOWN determines that such a water body or basin constitutes an amenity that contributes to the character of the mixed-use DEVELOPMENT and offers an active or passive leisure experience. g. At least 50 percent of the dedicated OPEN SPACE within a mixed-use DEVELOPMENT shall be usable for active and passive recreation including, but not limited to, walking, biking, playfields, picnicking, playgrounds, relaxation, and boating. h. The dedicated OPEN SPACE shall not be included in SUBDIVISION LOTs designated for DEVELOPMENT or in LOT size calculations. i. All approved OPEN SPACE shall be dedicated in accordance with the provisions of this section and as approved by TOWN COUNCIL prior to commencing any construction, regardless of whether or not the project will be completed in phases. D. Review Procedures. All requests for approval of a mixed-use zoning district shall be subject to the review and approval procedures of this section. Mixed-use zoning may be established on any property at the initiation of the TOWN or by rezoning application submitted by the property owner. If initiated by the TOWN, DEVELOPMENT of the property shall be subject to review and approval of concept and final DEVELOPMENT plans, in accordance with the applicable provisions of this section. 1. Approval Authority. a. The ZONING ADMINISTRATOR and PLANNING COMMISSION shall have review and recommendation authority for the concept plan. b. The TOWN COUNCIL shall have final approval authority for the concept plan. c. The ZONING ADMINISTRATOR shall have approval authority for a final plan/site- specific plan where no major changes to the approved concept plan, as defined in Article 14.8, are required. 2. Pre-application Review. 106 Town of Seabrook Island Development Standards Ordinance 59 a. All applicants seeking mixed-use zoning approval shall schedule a pre-application conference with the ZONING ADMINISTRATOR to discuss the proposed DEVELOPMENT prior to applying. The ZONING ADMINISTRATOR may include representatives from any outside agency, department, entity, or consultant as he or she deems appropriate. At the pre-application conference, the ZONING ADMINISTRATOR shall review a proposed sketch plan. b. At minimum, the sketch plan shall contain the following information: i. Location map of the proposed site; ii. General description of proposed land uses, including approximate location and acreage; and iii. Proposed GROSS DENSITY of the DEVELOPMENT, type of dwellings proposed, proposed GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and activities and NET DENSITY of individual areas or parcels within the DEVELOPMENT. c. A narrative description shall also accompany the sketch plan. The narrative shall describe how the proposed mixed-use zoning and uses relate to the goals and recommendations of the TOWN’s COMPREHENSIVE PLAN. The narrative shall also describe any anticipated inconsistencies between the proposed DEVELOPMENT and the provisions of this article. d. The ZONING ADMINISTRATOR shall review the sketch plan and narrative and advise the applicant regarding conformance or inconsistencies with the requirements of this article and any modifications that may be required to comply with the ordinance. Once the pre-application process is complete, if the applicant wishes to proceed with the zoning application, a concept plan of the entire mixed-use DEVELOPMENT shall be prepared and submitted with a formal application. 3. Concept Plan. a. Application requirements. i. A complete application shall be filed on a form provided by the ZONING ADMINISTRATOR, along with the application fee, a concept plan meeting all requirements of this section, and any DEVELOPMENT conditions proposed by the applicant. Incomplete applications or concept plans shall be returned to the applicant without further processing. ii. Unless specifically modified by DEVELOPMENT conditions accepted by the TOWN COUNCIL, a mixed-use DEVELOPMENT shall comply with all regulations in effect at the time of rezoning approval. iii. The mixture of uses shall be limited to those specified in Table 7-1. 107 Town of Seabrook Island Development Standards Ordinance 60 b. Concept plan requirements. At minimum, the concept plan shall contain the following information in schematic form, unless specifically waived by the ZONING ADMINISTRATOR: i. A title, giving the names of the developers and property owners, the date, scale, and the PERSON or firm preparing the plan. ii. A vicinity map and north arrow. iii. The location and size of the project site, including the total GROSS ACREAGE and total HIGH GROUND iv. The current zoning of the subject property and surrounding properties. v. The landowners and general land use of adjoining properties. vi. Location of proposed uses assigned to sub-areas. vii. A tabulation of total DWELLING UNITs and gross residential densities and the GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and activities. viii. Location of existing FLOOD zones, CRITICAL AREAS, WATERBODIES, WETLANDS, and other riparian areas, and significant environmental features. ix. General layout of transportation routes including streets and major pedestrian ways. x. The location of existing infrastructure (examples include roadways, sidewalks, and proximity of nearest water and/or sewer mains). xi. Conceptual location for any proposed public uses including schools, parks, fire, and medical emergency services, etc. xii. General areas to be designated for common OPEN SPACE. xiii. Tree survey, if applicable, in accordance with Section 11.5 B. xiv. A TRAFFIC IMPACT ANALYSIS shall be required. The analysis must be prepared by a professional transportation engineer with expertise in the preparation of TRAFFIC IMPACT ANALYSES and shall follow the requirements of Section 8.4. xv. A phasing plan, if applicable. c. Review and approval. i. Staff review. (a) Upon receipt of a complete mixed-use DEVELOPMENT application, the ZONING ADMINISTRATOR shall distribute the application materials to the 108 Town of Seabrook Island Development Standards Ordinance 61 appropriate TOWN staff, as well as representatives from any outside agency, department, entity, or consultant as he or she deems appropriate. (b) The ZONING ADMINISTRATOR shall prepare a staff report based on the comments provided by other reviewers. The report and recommendations shall be forwarded to the PLANNING COMMISSION for review and recommendation. (c) The ZONING ADMINISTRATOR shall provide notice as required by Section 19.2 and schedule consideration of the mixed-use application on the next available PLANNING COMMISSION agenda. The ZONING ADMINISTRATOR will then inform the applicant/agent when the request will appear on the PLANNING COMMISSION agenda for action on the application. The applicant or authorized representative must be present at the meeting or the matter will not be heard. ii. Optional joint work session. The applicant may request a joint work session with the TOWN COUNCIL and PLANNING COMMISSION to provide an opportunity to present the application and respond to any initial questions that members may have regarding the proposed DEVELOPMENT. (a) If the request is granted, the ZONING ADMINISTRATOR shall schedule the joint work session and notify the applicant when the session will occur. (b) No decision or final action may be taken at a joint work session. iii. PLANNING COMMISSION review and recommendation. (a) The ZONING ADMINISTRATOR shall present the staff report to the PLANNING COMMISSION. (b) After allowing time for presentation from the applicant and public comments, if any, the PLANNING COMMISSION shall consider the application for conformance with the requirements of this ordinance and the review criteria in Section 7.5. (c) The PLANNING COMMISSION shall then make a recommendation to the TOWN COUNCIL to approve or deny the application. iv. TOWN COUNCIL hearing and final decision. (a) The staff report and PLANNING COMMISSION recommendations shall be forwarded to the TOWN COUNCIL for review and final decision. (b) The ZONING ADMINISTRATOR shall provide notice, as required by Section 19.2 C, for a public hearing and schedule the mixed-use application on the next available TOWN COUNCIL agenda. (c) The ZONING ADMINISTRATOR shall present the staff report and PLANNING COMMISSION recommendation. 109 Town of Seabrook Island Development Standards Ordinance 62 (d) After allowing time for presentation from the applicant and holding the required public hearing, the TOWN COUNCIL shall consider the application for conformance with the requirements of this ordinance and the review criteria in Section 7.5. (e) Following the rezoning procedures, as specified in Section 19.2, the TOWN COUNCIL shall approve, deny, or refer the application back to the PLANNING COMMISSION for further consideration. d. DEVELOPMENT conditions. The applicant may offer conditions to be attached to the rezoning. Proposed conditions shall be submitted as part of the application and concept plan. i. Conditions may be more restrictive than the requirements of this article but shall not alter the intent of the applicable mixed-use district nor permit uses not otherwise authorized by Table 7-1. ii. The conditions shall be described in writing. iii. The DEVELOPMENT conditions shall be binding upon the property, unless amended in conformance with the requirements of this section. Upon approval of the rezoning application, the approved DEVELOPMENT conditions shall be recorded in the Register of Deeds Office. iv. If phasing is proposed, the applicant shall provide a general breakdown showing the various phases and the estimated schedule of construction. 4. Final Plan or Site-Specific Plan. a. Phasing. The mixed-use DEVELOPMENT may be completed in multiple phases. If the DEVELOPMENT is to be completed in a single phase, the applicant shall prepare and submit a final development plan. If the DEVELOPMENT is to be completed in more than one phase, the applicant shall prepare and submit a site-specific plan prior to construction of each phase of the project. In either case, the final plan/site-specific plan shall contain the elements required in Section 14.5 for final development plans and conform to the previously approved concept plan. b. Timing. An application for approval of the final plan for the mixed-use DEVELOPMENT or a site-specific plan for the initial phase(s) shall be submitted to the ZONING ADMINISTRATOR within 12 months of the date of TOWN COUNCIL’s approval of the concept plan and rezoning. c. ZONING ADMINISTRATOR review and approval. i. The ZONING ADMINISTRATOR shall distribute the final plan/site-specific plan application to the appropriate TOWN staff, as well as representatives from any outside agency, department, entity, or consultant as he or she deems appropriate. 110 Town of Seabrook Island Development Standards Ordinance 63 ii. Once the plan has been received and reviewed by the appropriate reviewers and the applicant has met all of the required elements of this ordinance, any other applicable regulations, and the approved concept plan and DEVELOPMENT conditions, the ZONING ADMINISTRATOR shall issue a final approval. iii. If the plan is inconsistent in any aspect with the approved concept plan, the ZONING ADMINISTRATOR shall follow the procedure specified in this section for amending an approved plan. 5. Amendments. Any and all amendments to the concept plan, development conditions and/or final/site-specific plans for the mixed-use shall be subject to the following review procedures: a. The ZONING ADMINISTRATOR shall have the authority to approve: i. Changes which result in a decrease in approved density or BUILDING size, either residential or non-residential. ii. Change in land use designation from MULTI-FAMILY, TWO-FAMILY, or TOWNHOME to SINGLE-FAMILY or a change from any other use to OPEN SPACE/passive recreation; provided, the minimum required proportion of non- RESIDENTIAL USEs shall be retained. iii. Change in infrastructure features (i.e., roads/access, sewer, water, storm drainage) internal to the mixed-use area which are clearly beneficial to the occupants of the mixed-use area and will have no impact on adjoining or off-site properties. iv. Movement of BUILDINGs within the same general vicinity as shown on the approved plan. v. Internal rearrangement of a PARKING LOT that does not affect the number of PARKING SPACEs or alter access locations or design. b. All other changes shall be considered as a new application and processed in accordance with the provisions of Section 7.4 C and D. E. Development Review Criteria. Applications for mixed-use DEVELOPMENT shall only be approved upon a finding of compliance with the following criteria: 1. Rezoning Criteria. The criteria of Article 19.3 B for rezonings shall be satisfied. 2. Development Plan Standards. The standards of Section 14.6 for development plans shall be satisfied. 3. Consistency with COMPREHENSIVE PLAN. All mixed-use DEVELOPMENT shall be designed, constructed, and maintained in conformance with the applicable guidelines and standards established by the TOWN’s COMPREHENSIVE PLAN. 4. Integration with Transportation System. Mixed-use DEVELOPMENTs shall be designed to integrate into the adjacent transportation system relative to: 111 Town of Seabrook Island Development Standards Ordinance 64 a. Pedestrian connections to ensure accessibility to current or future DEVELOPMENT, if applicable; b. Connectivity to existing and future roadways, sidewalks, and pathways; c. Complete streets roadway design that accommodates vehicular, pedestrian, and bicycle transportation modes; d. Strategic locations of PARKING LOTs and STRUCTUREs to facilitate shared parking; and e. Access management to provide internal connections between uses and minimize individual driveway access to perimeter roads. 5. Impact on Infrastructure. The DEVELOPMENT is staged in a manner that allows for and facilitates the timely provision of public utilities, facilities, and services. 6. Compatibility of Uses and STRUCTUREs. The mixed-use DEVELOPMENT is planned so land uses and densities create an appropriate transition to existing or planned uses and densities on adjoining properties. 7. DEVELOPMENT Balance. If constructed in phases, each phase shall include a mixture of residential types and/or residential and non-RESIDENTIAL USEs to ensure that each phase contributes to the mixed-use concept. 8. General Site Design: The following characteristics shall be incorporated into the mixed- use DEVELOPMENT: a. Pedestrian accessibility/concentration of DEVELOPMENT (critical mass) in a compact, walkable area. i. Uses are concentrated to promote convenient pedestrian access. ii. Pedestrian circulation is clearly defined and connects all uses. iii. Bicycle and pedestrian access are provided to adjacent DEVELOPMENTs. iv. Sidewalks are provided on each side of rights-of-way or PRIVATE STREETs throughout the DEVELOPMENT. v. Strip commercial DEVELOPMENT characterized by single story uncoordinated, unconnected BUILDINGs with large street FRONTAGE PARKING LOTs is specifically prohibited. Strip malls with uncoordinated, unconnected out-parcels are prohibited. All STRUCTUREs are fully integrated into the mixed-use project through common design themes (including, but not limited to, lighting, benches, landscaping, other decorative features but not necessarily BUILDING design), integration with a variety of uses, nonlinear arrangement, common spaces, pedestrian walkways, vehicular access connections, and other features. 112 Town of Seabrook Island Development Standards Ordinance 65 b. Plazas, courtyards, and other common areas are provided for public gathering and interaction. Amenities, such as benches, planters, lighting, fountains, art, and landscaping that further the design theme of the project and encourage interaction shall be provided. c. Mixed-use projects require special attention to BUILDING design because of the relationship of land uses in close proximity. Functional integration of residential and commercial uses shall be considered during design of mixed-use projects. The following standards are intended to guide DEVELOPMENT of mixed-use projects: i. The mixed-use DEVELOPMENT shall be designed and developed to provide an appropriate interrelationship between the various uses and STRUCTUREs within the DEVELOPMENT through the use of complementary materials, unified streetscape treatment, BUFFERing, connectivity for vehicular and pedestrian movement, BUILDING orientation, parking location and height transition. ii. Residential and commercial uses may be located within the same or adjoining STRUCTUREs, provided applicable health and safety regulations are followed. iii. STRUCTUREs shall provide architectural relief and interest, with emphasis at BUILDING entrances and along sidewalks, to promote and enhance a comfortable pedestrian scale and orientation. STRUCTUREs shall have consistent scale and massing to create a unified project. Compatibility with the immediate context is required. However, gradual transitions in scale and massing are permitted. (a) Blank walls shall be avoided by including ground floor windows, recesses, extensions and breaks in roof elevation. (b) Design shall provide differentiation between ground level spaces and upper stories. For example, bays or balconies for upper levels, and awnings, canopies, or other similar treatments for lower levels can provide differentiation. Variation in BUILDING materials, trim, paint, ornamentation, windows, or other features such as public art, may also be used. (c) Design shall ensure privacy in residential sectors through effective window placement, soundproofing, landscape screening, or orientation of outdoor living areas (e.g., balconies, PORCHes, and PATIOs). Opposite facing windows at close distances should be offset vertically or horizontally or employ appropriate materials (e.g., glazed or tinted) to protect privacy. d. Residential uses and diversity of housing types may be required. i. Subject to approval by TOWN COUNCIL, a mixed use development may be required to incorporate one or more types of residential uses (SINGLE-FAMILY, MULTI-FAMILY, TOWNHOME, cluster, or TWO-FAMILY) at densities not to exceed those permitted within the MU district, where recommended by the PLANNING COMMISSION to comply with the recommendations of the TOWN’s COMPREHENSIVE PLAN. 113 Town of Seabrook Island Development Standards Ordinance 66 ii. Where incorporated into the mixed-use DEVELOPMENT, SINGLE-FAMILY LOT sizes shall be varied to provide a mixture of LOT sizes. iii. Minimum LIVABLE FLOOR AREA requirement for SINGLE-FAMILY detached units shall be 850 sq. ft. All other residential types shall adhere to area per number of bedrooms, as listed in the Residential District Table 5-3c. e. Permitted flexibility in LOT sizes, SETBACKs, street widths and landscaping shall result in a more livable DEVELOPMENT, preservation of natural features, and creation of OPEN SPACE consistent with the policies of the COMPREHENSIVE PLAN and this ordinance. F. Timing. Approval of the final plan or site-specific plan shall be vested in accordance with the provisions of Section 1.6 B. of this ordinance. G. Site Development Regulations. In addition to the requirements of this article, all DEVELOPMENT in the Mixed-Use District shall meet the applicable requirements as listed elsewhere in this ordinance: 1. General Provisions – Article 2 2. Overlay Districts – Article 8 3. CONDITIONAL USE Requirements – Article 9 4. Environmental Performance Standards – Article 10 5. Trees, Landscaping and BUFFERing – Article 11 6. Parking and Loading – Article 12 7. SIGNs – Article 13 8. Site Plan Review – Article 14 Section 7.2 Planned Development (PD) District A. Purpose. The Planned Development (PD) district is established to: 1. Allow for a coordinated and compatible mix of land USEs, where appropriate, in a manner consistent with the TOWN’s COMPREHENSIVE PLAN; 2. Encourage innovative site planning, architectural design, and DEVELOPMENT flexibility that cannot be achieved under conventional zoning districts; 3. Enhance the quality, functionality, and overall character of new mixed-USE DEVELOPMENTs; 4. Ensure high-quality DEVELOPMENT through a UNIFIED DEVELOPMENT PLAN that establishes clear, enforceable, and site-specific standards and conditions; 114 Town of Seabrook Island Development Standards Ordinance 67 5. Protect and preserve environmentally sensitive areas, OPEN SPACEs, historic resources, and the established character of the community; 6. Promote the efficient and coordinated use of land and public infrastructure, including transportation systems, utilities, stormwater systems, and public services; and 7. Provide a clear, predictable, and equitable regulatory framework that balances DEVELOPMENT flexibility with the protection of public health, safety, and general welfare. B. Applicability. A PD district may be established for any parcel, or combination of contiguous parcels, by rezoning in accordance with the procedures, standards, and criteria set forth in this section. PD districts are intended to accommodate mixed-USE DEVELOPMENTs containing one or more of the following: 1. Residential DWELLINGs of varying types and densities, together with compatible commercial USES; 2. BUSINESS CENTERS, shopping centers, and similar multi-tenant commercial DEVELOPMENTs; 3. Office parks and professional or campus-style office DEVELOPMENTs; and 4. Any other mixture of two or more USEs deemed acceptable by TOWN COUNCIL. C. Minimum Area. To be eligible for rezoning as a PD district, a parcel, or combination of contiguous parcels, shall contain a minimum of five (5) acres of HIGH GROUND. D. UNIFIED DEVELOPMENT PLAN. Each PD district is anticipated to be unique and shall be subject to a site-specific UNIFIED DEVELOPMENT PLAN, which shall be adopted concurrently with rezoning approval. The UNIFIED DEVELOPMENT PLAN shall consist of two components: the PD district map and PD district text. 1. PD District Map. Each PD district shall include a map depicting the general layout of the proposed DEVELOPMENT and the permitted location(s) of authorized land USEs. Upon adoption by TOWN COUNCIL, the PD district map shall become the official zoning district map for the subject property. 2. PD District Text. The PD district text shall expressly enumerate the allowable USEs and applicable DEVELOPMENT standards for the PD district. Upon adoption by TOWN COUNCIL, the PD district text shall constitute the official zoning ordinance text governing the USE and DEVELOPMENT of the subject property. a. General Requirements. i. The PD district shall demonstrate innovative site planning for a coordinated mixture of USEs, as reflected in the PD district map. ii. Overall site design shall be harmonious with respect to landscaping; the placement and enclosure of PRINCIPAL and ACCESSORY USEs; BUILDING size, 115 Town of Seabrook Island Development Standards Ordinance 68 height and orientation; street patterns; vehicular and pedestrian connectivity; and relationships among USEs. Variety in BUILDING types, BUILDING HEIGHTs, façades, SETBACKS, and the size and location of OPEN SPACEs is encouraged. b. PERMITTED and CONDITIONAL USEs. i. Each PD district shall contain a list of PERMITTED and CONDITIONAL USEs authorized within the district. Only USEs expressly authorized in the PD district text shall be permitted. All other uses shall be prohibited. ii. Any USE proposed by an applicant and approved by TOWN COUNCIL may be authorized in the PD district text, including USEs not expressly listed in Appendix B: Consolidated Table of USEs. iii. When necessary to mitigate potential adverse impacts – including, but not limited to, traffic, noise, hours of operation, and similar factors – or to protect the public health, safety, and general welfare, the TOWN COUNCIL may impose reasonable conditions, limitations, or additional requirements on any authorized USE. Such conditions shall be in addition to all other standards otherwise applicable to the authorized USE. c. Required DEVELOPMENT Standards. The DEVELOPMENT standards identified in Table 7-2 shall be established in the PD district text, as applicable. If a specific DEVELOPMENT standard is not expressly identified in the PD district text, the corresponding standard of the RSF-1 district shall apply. Table 7-2. Required DEVELOPMENT Standards Category Standard to be Enumerated in PD District Text Residential Density Maximum Number of DWELLING UNITs (By DWELLING Type) Maximum Number of DWELLING UNITs (Total Project) Maximum DENSITY (DWELLING UNITS Per NET ACREAGE) Non-Residential Density Maximum USABLE FLOOR AREA (Per BUILDING or USE Type) Maximum USABLE FLOOR AREA (Total Project) REQUIRED SETBACKS Minimum FRONT YARD SETBACK Minimum SIDE YARD SETBACK Minimum REAR YARD SETBACK Minimum BUILDING Separation (For Multiple BUILDINGs on the Same LOT) BUFFERs Minimum BUFFER Width BUFFER Zone Specifications and Standards BUILDING Design Standards Maximum BUILDING HEIGHT Minimum LIVABLE FLOOR AREA (By DWELLING Type) LOT AREA & WIDTH Minimum LOT AREA Minimum LOT WIDTH LOT COVERAGE Maximum LOT COVERAGE (Per LOT) Maximum LOT COVERAGE (Total Project) OPEN SPACE Minimum OPEN SPACE Required (Total Project) OPEN SPACE Design Standards OPEN SPACE Conveyance & Management Plan 116 Town of Seabrook Island Development Standards Ordinance 69 Phasing Project Phasing Plan (If Applicable) d. Other DEVELOPMENT Standards. The PD district text may provide for variations from other DEVELOPMENT standards to allow flexibility in the arrangement of USEs and to promote and protect the public health, safety, and general welfare. Except as expressly modified in the PD district text, all DEVELOPMENT within a PD district shall comply with all other applicable requirements of this ordinance, including: i. General Provisions – Article 2 ii. Overlay Districts – Article 8 iii. CONDITIONAL USE Requirements – Article 9 iv. Environmental Performance Standards – Article 10 v. Trees, Landscaping and BUFFERing – Article 11 vi. Parking and Loading – Article 12 vii. SIGNs – Article 13 viii. Site Plan Review – Article 14 E. Adoption; Effect. 1. Rezoning Required. Establishment of a PD district shall require approval of a rezoning ordinance by TOWN COUNCIL. 2. Application. In addition to the requirements set forth in Section 19.2 A, each application to establish a PD district shall be accompanied by a proposed UNIFIED DEVELOPMENT PLAN consisting of a PD district map and PD district text. 3. Review Procedure. Applications to establish a PD district shall be processed as map amendments in accordance with the procedures set forth in Section 19.2. 4. Criteria for Review. Applications to establish a PD district shall be evaluated using the map amendment criteria set forth in Sections 19.3 B, C and D. 5. Binding Effect. Upon adoption, the approved PD ordinance and UNIFIED DEVELOPMENT PLAN shall be binding upon the subject property, and all future development shall conform thereto. Any substantial deviation shall require amendment of the PD ordinance in accordance with subsection F. 6. Enforcement. The TOWN may enforce the provisions of a PD district using all remedies authorized by law. F. Amendments. 117 Town of Seabrook Island Development Standards Ordinance 70 1. Major Amendments. Major amendments to a PD district shall require adoption of an ordinance of TOWN COUNCIL following review and recommendation by the PLANNING COMMISSION. Major amendments constitute zoning ordinance amendments and shall be processed as follows: a. Amendments to the PD district map shall be processed as map amendments in accordance with Section 19.2 and evaluated using the criteria set forth in Sections 19.3 A, C and D. b. Amendments to the PD district text shall be processed as text amendments in accordance with Section 19.2 and evaluated using the criteria set forth in Sections 19.3 B, C and D. 2. Minor Amendments. The PD district text may authorize a procedure for the review and approval of minor amendments to the UNIFIED DEVELOPMENT PLAN. When expressly authorized in the PD district text, the ZONING ADMINISTRATOR may approve minor amendments subject to any conditions or limitations imposed by TOWN COUNCIL. Any amendment which is not expressly authorized in the PD district text as a minor amendment shall be treated as a major amendment. G. Approved PD Districts. 1. Adopted. The PD districts listed in Table 7-2a are hereby adopted by reference as if fully set forth in this ordinance: Table 7-2a. Adopted PD Districts PD # PD Name Adopted Amended Ordinance Date Ordinance Date [RESERVED] 2. Records. Copies of all PD district ordinances and amendments thereto shall be maintained on file in the office of the ZONING ADMINISTRATOR. MU, Mixed-Use District. This district is established for the purpose of offering a tool that permits a combination of residential and non-RESIDENTIAL USEs within a cohesive integrated DEVELOPMENT. A variety of housing types is encouraged at moderate densities, along with complementary office, RETAIL, and service uses in scale with the character of the district and surrounding area. Size limits are imposed to ensure that NONRESIDENTIAL USEs remain appropriate to the district intent. Section 7.2 Schedule of Uses BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs in the districts indicated at the top of Table 7-2 may be used for the purposes denoted by the following abbreviations: A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right. 118 Town of Seabrook Island Development Standards Ordinance 71 B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right, provided the specific conditions related to that use, as found in Article 9 are met. C. Specific Conditions. Indicates the relevant section listing the requirements or conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the general criteria of Section 9.3. Table 7-2 Schedule of Uses: Mixed-Use District USE MU Specific Conditions ACCESSORY USEs ACCESSORY USEs and STRUCTUREs P Drive-in and drive-through facilities for automated teller machines, banks, pharmacies, and similar uses (not including DRIVE-THROUGH RESTAURANTs) C Section 9.4 B Outdoor display areas for RETAIL ESTABLISHMENTs C Section 9.4 J Outdoor seating at eating/drinking establishments C Section 9.4 K Outdoor storage facilities C Section 9.4 L Agriculture and Conservation Bulkhead and EROSION control devices P Community gardens P Open space preserves such as WETLANDs and wildlife habitat refuge areas P Entertainment, Hospitality, and Leisure Boat docks, landings and launches P Classroom and lecture facilities P Establishments serving alcoholic beverages C Section 9.4 D Fitness club/health spa P Greenways, boardwalks, and non-motorized trails/pathways P Gymnasium and indoor recreation facilities P HOTELs P MARINA C Section 9.4 H Non-commercial community or neighborhood activity uses such as, park/playground, swimming pool, storage STRUCTUREs, and off-street parking P OPEN AIR RECREATION uses P Section 9.4 I RESTAURANTs (not including DRIVE-THROUGH facilities) P Office Banks, savings & loans, and similar financial institutions P Government offices P Medical, dental or chiropractic office, including clinics and/or laboratory P Offices, general and professional P Residential DWELLINGS on upper floors above businesses C Section 9.4 C HOME OCCUPATIONs C Section 9.4 F SHORT-TERM RENTAL UNITs C Section 9.4 O MULTI-FAMILY DWELLINGs P SINGLE-FAMILY DWELLINGs P 119 Town of Seabrook Island Development Standards Ordinance 72 TOWNHOMEs P TWO-FAMILY DWELLINGs P VACATION CLUB UNIT C Section 9.4 Q RETAIL Establishments, not exceeding 5,000 square feet, selling goods at RETAIL within a fully enclosed BUILDING P Establishments larger than 5,000 square feet but not more than 10,000 square feet, selling goods at RETAIL within a fully enclosed BUILDING C Section 9.4 N Services Government facilities, including storage and MAINTENANCE facilities P PERSONAL SERVICEs P Photographic studios P PLACES OF PUBLIC WORSHIP P UTILITY substation or subinstallation C Section 9.4 P Wireless communication antennas or towers C Section 9.4 T Other Similar Uses C Section 2.6 G Section 7.3 Spatial Requirements A. Area and Density. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 7-3. New LOTs shall not be created, except in conformance with these requirements. 120 Town of Seabrook Island Development Standards Ordinance 73 Table 7-3. LOT AREA, Width, and Density Requirements, Mixed-Use District Zoning District Size Area Occupied by Non- RESIDENTIAL USES (%) Min. Width (ft.) Density (max. units/ NET Resid. ACRE Project Area (acres) Minimum Min. OPEN SPACE (%) Minimum Maximum MU 5 20 20 50 200 15 B. Density Bonus. A residential density bonus over and above the density otherwise allowed in the mixed-use district may be approved by TOWN COUNCIL provided the applicant increases the percentage of the total project area dedicated for OPEN SPACE. This bonus may be granted only if specifically requested by the applicant. Such bonus shall consist of an additional one (1) unit per NET ACRE of allowable density for every additional five (5) percent of HIGH GROUND land area devoted to dedicated OPEN SPACE beyond the minimum requirement; provided, the maximum bonus shall not exceed an additional five (5) units per NET ACRE. C. SETBACKs. All STRUCTUREs and their placement on a LOT shall conform to the minimum dimensional requirements listed in Table 7-3a. Table 7-3a. Dimensional Requirements, Mixed-Use District Zoning District Maximum BUILDING HEIGHT (ft./stories) Minimum Yard SETBACKs (ft.)22 Front Side Rear Parking BUILDING MU 36 20 20 20 40 D. OPEN SPACE. Dedicated OPEN SPACE shall be provided in accordance with the following standards: 1. A minimum 20 percent of the gross land area, as specified in Table 7-3, shall be dedicated OPEN SPACE. 2. Dedicated OPEN SPACE shall be shown on the concept plan and preliminary PLAT, if applicable, and shall be labeled to specify that the land is to be dedicated for OPEN SPACE purposes. The OPEN SPACE land is to be permanently reserved for OPEN SPACE purposes. The applicant shall convey the dedicated OPEN SPACE as a condition of approval through any of the following means, as approved by the TOWN COUNCIL: a. Deeded in perpetuity to the TOWN; b. Reserved for common use or ownership of all property owners within the DEVELOPMENT by covenants in the deeds approved by the TOWN attorney. A copy of the proposed covenants shall be submitted with the application for final site plan approval; 22 Setbacks apply to the perimeter boundary of the project area. Individual setbacks within the mixed-use development shall be determined during the development plan review process, based on the setback requirements for the zoning district corresponding with the proposed use. 121 Town of Seabrook Island Development Standards Ordinance 74 c. Deeded in perpetuity to a private, non-profit, tax-exempt organization legally constituted for conservation purposes under terms and conditions that ensure the perpetual protection and management of the property for conservation purposes. A copy of the proposed deed and relevant corporate documents of the land trust shall be submitted with the final site plan application; d. Deeded to a property owner's association or REGIME within the DEVELOPMENT upon terms and conditions approved by the TOWN attorney that will ensure the continued use and management of the land for the intended purposes. If this option is selected, the formation and incorporation by the applicant of one or more appropriate property owners' associations or REGIMEs shall be required prior to approval. A copy of the proposed property owner's deed and the by-laws and other relevant documents of the property owner's association or REGIME shall be submitted with the final site plan application. The following shall be required if OPEN SPACE is to be dedicated to a property owners' association or REGIME: i. Covenants providing for mandatory membership in the association/REGIME and setting forth the owner's rights, interests, and privileges in the association and the common land, must be included in the deed for each LOT or unit; ii. The property owners' association or REGIME shall have the responsibility of maintaining the OPEN SPACE and shall operate and maintain any recreational facilities which may be provided within the OPEN SPACE; iii. The association or REGIME shall have the authority to levy charges against all property owners to defray the expenses connected with the operation and MAINTENANCE of OPEN SPACE and recreational facilities; and iv. The applicant shall maintain control of dedicated OPEN SPACE and be responsible for its MAINTENANCE until DEVELOPMENT sufficient to support the association or REGIME has taken place. 3. OPEN SPACE to be dedicated to the TOWN shall have shape, dimension, character, location, and topography to ensure appropriate public access and usability, and to accomplish at least two (2) of the following OPEN SPACE purposes: a. natural resource conservation, b. WETLAND and water course conservation, c. selective forestry, d. wildlife habitat, e. recreation, f. civic purposes, or g. scenic preservation. 122 Town of Seabrook Island Development Standards Ordinance 75 4. Dedicated OPEN SPACE features that are not dedicated to the TOWN may be open to the general public or restricted to the residents or property owners within the DEVELOPMENT. 5. Streets, sidewalks, PARKING LOTs and other IMPERVIOUS SURFACEs shall be excluded from the calculation of required OPEN SPACE. However, lands occupied by bike paths, tennis courts, or similar common recreational amenities may be counted as dedicated OPEN SPACE; provided, such IMPERVIOUS SURFACEs shall not constitute more than 10 percent of the total required OPEN SPACE. 6. Up to 50 percent of the dedicated OPEN SPACE requirement may be satisfied with land covered by water or by stormwater detention or retention basins if the TOWN determines that such a water body or basin constitutes an amenity that contributes to the character of the mixed-use DEVELOPMENT and offers an active or passive leisure experience. 7. At least 50 percent of the dedicated OPEN SPACE within a mixed-use DEVELOPMENT shall be usable for active and passive recreation including, but not limited to, walking, biking, playfields, picnicking, playgrounds, relaxation, and boating. 8. The dedicated OPEN SPACE shall not be included in SUBDIVISION LOTs designated for DEVELOPMENT or in LOT size calculations. 9. All approved OPEN SPACE shall be dedicated in accordance with the provisions of this section and as approved by TOWN COUNCIL prior to commencing any construction, regardless of whether or not the project will be completed in phases. Section 7.4 Review Procedures All requests for approval of a mixed-use zoning district shall be subject to the review and approval procedures of this section. Mixed-use zoning may be established on any property at the initiation of the TOWN or by rezoning application submitted by the property owner. If initiated by the TOWN, DEVELOPMENT of the property shall be subject to review and approval of concept and final DEVELOPMENT plans, in accordance with the applicable provisions of this section. A. Approval Authority. 1. The ZONING ADMINISTRATOR and PLANNING COMMISSION shall have review and recommendation authority for the concept plan. 2. The TOWN COUNCIL shall have final approval authority for the concept plan. 3. The ZONING ADMINISTRATOR shall have approval authority for a final plan/site-specific plan where no major changes to the approved concept plan, as defined in Article 14.8, are required. B. Pre-application Review. 1. All applicants seeking mixed-use zoning approval shall schedule a pre-application conference with the ZONING ADMINISTRATOR to discuss the proposed DEVELOPMENT prior to applying. The ZONING ADMINISTRATOR may include representatives from any 123 Town of Seabrook Island Development Standards Ordinance 76 outside agency, department, entity, or consultant as he or she deems appropriate. At the pre-application conference, the ZONING ADMINISTRATOR shall review a proposed sketch plan. 2. At minimum, the sketch plan shall contain the following information: a. Location map of the proposed site; b. General description of proposed land uses, including approximate location and acreage; and c. Proposed GROSS DENSITY of the DEVELOPMENT, type of dwellings proposed, proposed GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and activities and NET DENSITY of individual areas or parcels within the DEVELOPMENT. 3. A narrative description shall also accompany the sketch plan. The narrative shall describe how the proposed mixed-use zoning and uses relate to the goals and recommendations of the TOWN’s COMPREHENSIVE PLAN. The narrative shall also describe any anticipated inconsistencies between the proposed DEVELOPMENT and the provisions of this article. 4. The ZONING ADMINISTRATOR shall review the sketch plan and narrative and advise the applicant regarding conformance or inconsistencies with the requirements of this article and any modifications that may be required to comply with the ordinance. Once the pre- application process is complete, if the applicant wishes to proceed with the zoning application, a concept plan of the entire mixed-use DEVELOPMENT shall be prepared and submitted with a formal application. C. Concept Plan. 1. Application requirements. a. A complete application shall be filed on a form provided by the ZONING ADMINISTRATOR, along with the application fee, a concept plan meeting all requirements of this section, and any DEVELOPMENT conditions proposed by the applicant. Incomplete applications or concept plans shall be returned to the applicant without further processing. b. Unless specifically modified by DEVELOPMENT conditions accepted by the TOWN COUNCIL, a mixed-use DEVELOPMENT shall comply with all regulations in effect at the time of rezoning approval. c. The mixture of uses shall be limited to those specified in Table 7-2. 2. Concept plan requirements. At minimum, the concept plan shall contain the following information in schematic form, unless specifically waived by the ZONING ADMINISTRATOR: a. A title, giving the names of the developers and property owners, the date, scale, and the PERSON or firm preparing the plan. 124 Town of Seabrook Island Development Standards Ordinance 77 b. A vicinity map and north arrow. c. The location and size of the project site, including the total GROSS ACREAGE and total HIGH GROUND d. The current zoning of the subject property and surrounding properties. e. The landowners and general land use of adjoining properties. f. Location of proposed uses assigned to sub-areas. g. A tabulation of total DWELLING UNITs and gross residential densities and the GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and activities. h. Location of existing FLOOD zones, CRITICAL AREAS, WATERBODIES, WETLANDS, and other riparian areas, and significant environmental features. i. General layout of transportation routes including streets and major pedestrian ways. j. The location of existing infrastructure (examples include roadways, sidewalks, and proximity of nearest water and/or sewer mains). k. Conceptual location for any proposed public uses including schools, parks, fire, and medical emergency services, etc. l. General areas to be designated for common OPEN SPACE. m. Tree survey, if applicable, in accordance with Section 11.5 B. n. A TRAFFIC IMPACT ANALYSIS shall be required. The analysis must be prepared by a professional transportation engineer with expertise in the preparation of TRAFFIC IMPACT ANALYSES and shall follow the requirements of Section 8.4. o. A phasing plan, if applicable. 3. Review and approval. a. Staff review. i. Upon receipt of a complete mixed-use DEVELOPMENT application, the ZONING ADMINISTRATOR shall distribute the application materials to the appropriate TOWN staff, as well as representatives from any outside agency, department, entity, or consultant as he or she deems appropriate. ii. The ZONING ADMINISTRATOR shall prepare a staff report based on the comments provided by other reviewers. The report and recommendations shall be forwarded to the PLANNING COMMISSION for review and recommendation. iii. The ZONING ADMINISTRATOR shall provide notice as required by Section 19.2 and schedule consideration of the mixed-use application on the next available 125 Town of Seabrook Island Development Standards Ordinance 78 PLANNING COMMISSION agenda. The ZONING ADMINISTRATOR will then inform the applicant/agent when the request will appear on the PLANNING COMMISSION agenda for action on the application. The applicant or authorized representative must be present at the meeting or the matter will not be heard. b. Optional joint work session. The applicant may request a joint work session with the TOWN COUNCIL and PLANNING COMMISSION to provide an opportunity to present the application and respond to any initial questions that members may have regarding the proposed DEVELOPMENT. i. If the request is granted, the ZONING ADMINISTRATOR shall schedule the joint work session and notify the applicant when the session will occur. ii. No decision or final action may be taken at a joint work session. c. PLANNING COMMISSION review and recommendation. i. The ZONING ADMINISTRATOR shall present the staff report to the PLANNING COMMISSION. ii. After allowing time for presentation from the applicant and public comments, if any, the PLANNING COMMISSION shall consider the application for conformance with the requirements of this ordinance and the review criteria in Section 7.5. iii. The PLANNING COMMISSION shall then make a recommendation to the TOWN COUNCIL to approve or deny the application. d. TOWN COUNCIL hearing and final decision. i. The staff report and PLANNING COMMISSION recommendations shall be forwarded to the TOWN COUNCIL for review and final decision. ii. The ZONING ADMINISTRATOR shall provide notice, as required by Section 19.2 C, for a public hearing and schedule the mixed-use application on the next available TOWN COUNCIL agenda. iii. The ZONING ADMINISTRATOR shall present the staff report and PLANNING COMMISSION recommendation. iv. After allowing time for presentation from the applicant and holding the required public hearing, the TOWN COUNCIL shall consider the application for conformance with the requirements of this ordinance and the review criteria in Section 7.5. v. Following the rezoning procedures, as specified in Section 19.2, the TOWN COUNCIL shall approve, deny, or refer the application back to the PLANNING COMMISSION for further consideration. 126 Town of Seabrook Island Development Standards Ordinance 79 4. DEVELOPMENT conditions. The applicant may offer conditions to be attached to the rezoning. Proposed conditions shall be submitted as part of the application and concept plan. a. Conditions may be more restrictive than the requirements of this article but shall not alter the intent of the applicable mixed-use district nor permit uses not otherwise authorized by Table 7-2. b. The conditions shall be described in writing. c. The DEVELOPMENT conditions shall be binding upon the property, unless amended in conformance with the requirements of this section. Upon approval of the rezoning application, the approved DEVELOPMENT conditions shall be recorded in the Register of Deeds Office. d. If phasing is proposed, the applicant shall provide a general breakdown showing the various phases and the estimated schedule of construction. D. Final Plan or Site-Specific Plan. 1. Phasing. The mixed-use DEVELOPMENT may be completed in multiple phases. If the DEVELOPMENT is to be completed in a single phase, the applicant shall prepare and submit a final development plan. If the DEVELOPMENT is to be completed in more than one phase, the applicant shall prepare and submit a site-specific plan prior to construction of each phase of the project. In either case, the final plan/site-specific plan shall contain the elements required in Section 14.5 for final development plans and conform to the previously approved concept plan. 2. Timing. An application for approval of the final plan for the mixed-use DEVELOPMENT or a site-specific plan for the initial phase(s) shall be submitted to the ZONING ADMINISTRATOR within 12 months of the date of TOWN COUNCIL’s approval of the concept plan and rezoning. 3. ZONING ADMINISTRATOR review and approval. a. The ZONING ADMINISTRATOR shall distribute the final plan/site-specific plan application to the appropriate TOWN staff, as well as representatives from any outside agency, department, entity, or consultant as he or she deems appropriate. b. Once the plan has been received and reviewed by the appropriate reviewers and the applicant has met all of the required elements of this ordinance, any other applicable regulations, and the approved concept plan and DEVELOPMENT conditions, the ZONING ADMINISTRATOR shall issue a final approval. c. If the plan is inconsistent in any aspect with the approved concept plan, the ZONING ADMINISTRATOR shall follow the procedure specified in this section for amending an approved plan. E. Amendments. Any and all amendments to the concept plan, development conditions and/or final/site-specific plans for the mixed-use shall be subject to the following review procedures: 127 Town of Seabrook Island Development Standards Ordinance 80 1. The ZONING ADMINISTRATOR shall have the authority to approve: a. Changes which result in a decrease in approved density or BUILDING size, either residential or non-residential. b. Change in land use designation from MULTI-FAMILY, TWO-FAMILY, or TOWNHOME to SINGLE-FAMILY or a change from any other use to OPEN SPACE/passive recreation; provided, the minimum required proportion of non-RESIDENTIAL USEs shall be retained. c. Change in infrastructure features (i.e., roads/access, sewer, water, storm drainage) internal to the mixed-use area which are clearly beneficial to the occupants of the mixed-use area and will have no impact on adjoining or off-site properties. d. Movement of BUILDINGs within the same general vicinity as shown on the approved plan. e. Internal rearrangement of a PARKING LOT that does not affect the number of PARKING SPACEs or alter access locations or design. 2. All other changes shall be considered as a new application and processed in accordance with the provisions of Section 7.4 C and D. Section 7.5 Development Review Criteria Applications for mixed-use DEVELOPMENT shall only be approved upon a finding of compliance with the following criteria: A. Rezoning Criteria. The criteria of Article 19.3 B for rezonings shall be satisfied. B. Development Plan Standards. The standards of Section 14.6 for development plans shall be satisfied. C. Consistency with COMPREHENSIVE PLAN. All mixed-use DEVELOPMENT shall be designed, constructed, and maintained in conformance with the applicable guidelines and standards established by the TOWN’s COMPREHENSIVE PLAN. D. Integration with Transportation System. Mixed-use DEVELOPMENTs shall be designed to integrate into the adjacent transportation system relative to: 1. Pedestrian connections to ensure accessibility to current or future DEVELOPMENT, if applicable; 2. Connectivity to existing and future roadways, sidewalks, and pathways; 3. Complete streets roadway design that accommodates vehicular, pedestrian, and bicycle transportation modes; 4. Strategic locations of PARKING LOTs and STRUCTUREs to facilitate shared parking; and 128 Town of Seabrook Island Development Standards Ordinance 81 5. Access management to provide internal connections between uses and minimize individual driveway access to perimeter roads. E. Impact on Infrastructure. The DEVELOPMENT is staged in a manner that allows for and facilitates the timely provision of public utilities, facilities, and services. F. Compatibility of Uses and STRUCTUREs. The mixed-use DEVELOPMENT is planned so land uses and densities create an appropriate transition to existing or planned uses and densities on adjoining properties. G. DEVELOPMENT Balance. If constructed in phases, each phase shall include a mixture of residential types and/or residential and non-RESIDENTIAL USEs to ensure that each phase contributes to the mixed-use concept. H. General Site Design: The following characteristics shall be incorporated into the mixed-use DEVELOPMENT: 1. Pedestrian accessibility/concentration of DEVELOPMENT (critical mass) in a compact, walkable area. a. Uses are concentrated to promote convenient pedestrian access. b. Pedestrian circulation is clearly defined and connects all uses. c. Bicycle and pedestrian access are provided to adjacent DEVELOPMENTs. d. Sidewalks are provided on each side of rights-of-way or PRIVATE STREETs throughout the DEVELOPMENT. e. Strip commercial DEVELOPMENT characterized by single story uncoordinated, unconnected BUILDINGs with large street FRONTAGE PARKING LOTs is specifically prohibited. Strip malls with uncoordinated, unconnected out-parcels are prohibited. All STRUCTUREs are fully integrated into the mixed-use project through common design themes (including, but not limited to, lighting, benches, landscaping, other decorative features but not necessarily BUILDING design), integration with a variety of uses, nonlinear arrangement, common spaces, pedestrian walkways, vehicular access connections, and other features. 2. Plazas, courtyards, and other common areas are provided for public gathering and interaction. Amenities, such as benches, planters, lighting, fountains, art, and landscaping that further the design theme of the project and encourage interaction shall be provided. 3. Mixed-use projects require special attention to BUILDING design because of the relationship of land uses in close proximity. Functional integration of residential and commercial uses shall be considered during design of mixed-use projects. The following standards are intended to guide DEVELOPMENT of mixed-use projects: a. The mixed-use DEVELOPMENT shall be designed and developed to provide an appropriate interrelationship between the various uses and STRUCTUREs within the 129 Town of Seabrook Island Development Standards Ordinance 82 DEVELOPMENT through the use of complementary materials, unified streetscape treatment, BUFFERing, connectivity for vehicular and pedestrian movement, BUILDING orientation, parking location and height transition. b. Residential and commercial uses may be located within the same or adjoining STRUCTUREs, provided applicable health and safety regulations are followed. c. STRUCTUREs shall provide architectural relief and interest, with emphasis at BUILDING entrances and along sidewalks, to promote and enhance a comfortable pedestrian scale and orientation. STRUCTUREs shall have consistent scale and massing to create a unified project. Compatibility with the immediate context is required. However, gradual transitions in scale and massing are permitted. i. Blank walls shall be avoided by including ground floor windows, recesses, extensions and breaks in roof elevation. ii. Design shall provide differentiation between ground level spaces and upper stories. For example, bays or balconies for upper levels, and awnings, canopies, or other similar treatments for lower levels can provide differentiation. Variation in BUILDING materials, trim, paint, ornamentation, windows, or other features such as public art, may also be used. iii. Design shall ensure privacy in residential sectors through effective window placement, soundproofing, landscape screening, or orientation of outdoor living areas (e.g., balconies, PORCHes, and PATIOs). Opposite facing windows at close distances should be offset vertically or horizontally or employ appropriate materials (e.g., glazed or tinted) to protect privacy. 4. Residential uses and diversity of housing types may be required. a. Subject to approval by TOWN COUNCIL, a mixed use development may be required to incorporate one or more types of residential uses (SINGLE-FAMILY, MULTI-FAMILY, TOWNHOME, cluster, or TWO-FAMILY) at densities not to exceed those permitted within the MU district, where recommended by the PLANNING COMMISSION to comply with the recommendations of the TOWN’s COMPREHENSIVE PLAN. b. Where incorporated into the mixed-use DEVELOPMENT, SINGLE-FAMILY LOT sizes shall be varied to provide a mixture of LOT sizes. c. Minimum LIVABLE FLOOR AREA requirement for SINGLE-FAMILY detached units shall be 850 sq. ft. All other residential types shall adhere to area per number of bedrooms, as listed in the Residential District Table 5-3c. 5. Permitted flexibility in LOT sizes, SETBACKs, street widths and landscaping shall result in a more livable DEVELOPMENT, preservation of natural features, and creation of OPEN SPACE consistent with the policies of the COMPREHENSIVE PLAN and this ordinance. 130 Town of Seabrook Island Development Standards Ordinance 83 Section 7.6 Timing Approval of the final plan or site-specific plan shall be vested in accordance with the provisions of Section 1.6 B. of this ordinance. Section 7.7 Site Development Regulations A. In addition to the requirements of this article, all DEVELOPMENT in the Mixed-Use District shall meet the applicable requirements as listed elsewhere in this ordinance: B. General Provisions – Article 2 C. CONDITIONAL USE Requirements – Article 9 D. Environmental Performance Standards – Article 10 E. Trees, Landscaping and BUFFERing – Article 11 F. Parking and Loading – Article 12 G. Signs – Article 13 H. Site Plan Review – Article 14 131 Town of Seabrook Island Development Standards Ordinance 84 Article 8: Overlay Districts ARTICLE 8 Overlay Districts Town of Seabrook Island Development Standards Ordinance 132 Town of Seabrook Island Development Standards Ordinance 85 Section 8.1 Seabrook Island Road Overlay District A. Purpose. As the only public right-of-way providing access to and from the TOWN, it is essential that Seabrook Island Road be maintained as a safe, efficient, functional, and attractive corridor. The Seabrook Island Road OVERLAY DISTRICT is established for that purpose. Regulations are established by this section to manage access to and from abutting properties, create an inviting and unified appearance along the corridor, protect the corridor’s prized natural features, promote alternate modes of transportation, and preserve the value of abutting properties. B. Applicability. 1. An OVERLAY DISTRICT is hereby established for a portion of Seabrook Island Road lying between its intersection with Long Bend Drive and the roundabout located at its intersection with Betsy Kerrison Parkway, Kiawah Island Parkway and Village Green Lane, and extending 250 feet in both directions from the outer edge of the right-of-way or property line. The boundaries of the Seabrook Island Road OVERLAY DISTRICT shall be as illustrated on the official ZONING MAP referenced in Section 3.2. 2. The requirements of the Seabrook Island Road OVERLAY DISTRICT shall apply only to property located within the corporate limits of the TOWN. Property within the boundaries of the Seabrook Island Road OVERLAY DISTRICT, but located outside the corporate limits of the TOWN, as of the effective date of this ordinance, shall become subject to the requirements of this section only upon annexation into the TOWN; provided, any construction or other DEVELOPMENT activity within the right-of-way, including but not limited to encroachment permits, stormwater impacts, UTILITY construction, or other IMPROVEMENTs or impacts occurring within the right-of-way shall be subject to the requirements of this section. 3. The requirements of this section are in addition to, and shall supplement, those imposed on the same lands by any underlying zoning provisions of this ordinance or other ordinances of the TOWN. To the extent a conflict exists, these regulations shall supersede all conflicting regulations, unless otherwise specified. C. District Requirements. 1. PERMITTED and CONDITIONAL USEs. All PERMITTED and CONDITIONAL USEs allowed within the underlying zoning district shall be permitted within the Seabrook Island Road OVERLAY DISTRICT, subject to the applicable requirements of the underlying district, unless superseded by this section. 2. Spatial Requirements. Except as otherwise specified, the spatial requirements of the underlying zoning district shall control. 3. Permits. a. A permit shall be required for any project within the Seabrook Island Road OVERLAY DISTRICT (whether within or outside the corporate limits of the TOWN) which: i. is proposed to have access to Seabrook Island Road via driveway or street; 133 Town of Seabrook Island Development Standards Ordinance 86 ii. which in any manner may impact drainage to, from, under, or within the Seabrook Island Road right-of-way; iii. which in any manner may impact utilities (whether owned and/or operated by the TOWN or others) located above, below, or within the Seabrook Island Road right- of-way; and/or iv. which involves any other construction, change, or alteration of land within the Seabrook Island Road right-of-way. b. Applicants shall furnish a SITE DEVELOPMENT PLAN, as required by Article 14. and such additional information concerning the proposed project, as may be required by the TOWN, including the following, at no expense to the TOWN, before a permit is considered: i. a TRAFFIC IMPACT ANALYSIS, prepared to the TOWN’s specifications, in accordance with the requirements of subsection 8.4 D, by a qualified transportation engineer registered in the State of South Carolina; ii. a drainage study, prepared to the TOWN's specifications, which identifies and quantifies drainage from the proposed DEVELOPMENT, including its impact on existing roadway drainage systems and compliance with all applicable provisions of the TOWN's stormwater program; and iii. a UTILITY impact study, prepared to the TOWN's specifications, which identifies and quantifies the impact of the proposed DEVELOPMENT on any public or private utilities located above, below or within the Seabrook Island Road right-of- way. c. Completed permit applications, including any required studies, shall be submitted to the ZONING ADMINISTRATOR for review and approval by the PLANNING COMMISSION prior to issuance of a permit. At its sole discretion, the PLANNING COMMISSION may request independent consultant review of studies, plans, and other documents submitted as part of the application. The applicant shall bear the cost of such review. d. The PLANNING COMMISSION may attach such conditions of approval as it deems necessary to protect the interests of the TOWN, PUBLIC STREET or right-of-way, and drainage system and utilities, including without limitation requiring the applicant to: i. construct IMPROVEMENTs and/or erect traffic signs and/or signals determined to be necessary to mitigate traffic impacts from the proposed DEVELOPMENT, or alternatively, make payment to the TOWN to defray the entire cost of such IMPROVEMENTs; ii. install replacements and/or modifications to existing roadway drainage systems, as specified by the TOWN, or alternatively, make payment to the TOWN to defray the entire cost of such replacements and/or modifications; and 134 Town of Seabrook Island Development Standards Ordinance 87 iii. REPAIR and/or REPLACE utilities, as specified by the TOWN, or alternatively, make payment to the TOWN to defray the entire cost of doing the same or reach agreement regarding the costs with any UTILITY not controlled by the TOWN. 4. Access. Control over the number and location of access points along Seabrook Island Road, as specified in this section, is necessary to reduce congestion, improve safety, maintain acceptable traffic flow, and minimize confusion. Therefore, the standards of this section shall apply to all property having FRONTAGE on and direct access to that segment of Seabrook Island Road. It shall be the policy of the TOWN to minimize the number of new points of access. The use of feeder streets and neighborhood road networks is encouraged in order to minimize the number of roads and driveways intersecting with Seabrook Island Road or other ARTERIAL STREETs. a. Access in General. i. For purposes of this section, points of vehicular access shall be defined to include streets and driveways intersecting with (i.e., providing ingress to and egress from) Seabrook Island Road. ii. To the extent feasible, properties abutting Seabrook Island Road shall not have direct access to that street, but shall provide street FRONTAGE on interior, collector roads. iii. To the extent feasible, tract property abutting Seabrook Island Road shall be provided with one (1) point of vehicular access to the tract. SUBDIVISION of property subsequent to the effective date of this section shall not entitle the owner(s) to direct access if alternative access through interior roads is either available or feasible. iv. To the extent feasible, vehicular access to Seabrook Island Road shall be limited to no more than one (1) point of access per every 600 ft. when the proposed access point is located within or adjacent to the public right-of-way. b. Driveway Location. i. Driveways shall be positioned to minimize interference with the free movement of traffic, to provide adequate sight distance, and to provide the most favorable driveway grade. ii. Driveways, including the radii, but not including right turn lanes, passing lanes, and tapers, shall be located entirely within the right-of-way FRONTAGE of the property being served, unless otherwise approved by the PLANNING COMMISSION, and upon written certification from the adjacent property owner agreeing to such encroachment. c. Driveway Spacing. 135 Town of Seabrook Island Development Standards Ordinance 88 i. Minimum spacing between two driveways, between a driveway and a street intersection, or between two street intersections, on the same side of the street, shall be 600 feet. The minimum spacing shall be measured from centerline to centerline for all driveways and street intersections. ii. To reduce left-turn conflicts, new driveways shall be aligned with those across the street, where possible. If alignment is not possible, driveways shall be offset from those on the opposite side of the street by at least 200 feet, measured from centerline to centerline. The PLANNING COMMISSION may reduce this requirement, as provided in paragraph (d) below, where there is insufficient FRONTAGE and shared access with an adjacent site is not feasible. Greater offsets may be required depending on the expected inbound and outbound turn volumes to and from both driveways. d. Modification of Requirements. i. Modification to the spacing and other requirements above may be permitted by the PLANNING COMMISSION under the following conditions, provided the requirements of paragraph d(ii) are also satisfied. (a) The modification will allow an existing driveway to remain that does not meet the standards of this section but that has, or is expected to have, very low traffic volumes (less than 50 in- and out-bound trips per day) and is not expected to impact safe traffic operations. (b) The use is expected to generate a relatively high number of trips (exceeding 200/peak hour) and an additional driveway will improve overall traffic operations. (c) Practical difficulties exist on the site (sight distance limitations, existing DEVELOPMENT, soil conditions, the presence of CRITICAL AREAS, WATERBODIES, or WETLANDs, or unique site configuration) that make compliance unreasonable; or existing off-site driveways make it impractical to fully comply with the standards. 136 Town of Seabrook Island Development Standards Ordinance 89 (d) Because of restricted turning movements or the presence of a median that restricts turning movements, the driveway will not contribute to congestion or create an unsafe situation. ii. The PLANNING COMMISSION may waive or modify certain requirements of this section upon consideration of the following: (a) The proposed modification is consistent with the general intent of the standards of this section and the recommendations of the TOWN’s COMPREHENSIVE PLAN. (b) Driveway geometrics have been improved to the extent practical to reduce impacts on traffic flow. (c) Shared access has been provided, or the applicant has demonstrated it is not practical. (d) Such modification is the minimum necessary to provide reasonable access, will not impair public safety, will not prevent the logical DEVELOPMENT or redevelopment of adjacent sites, and is not simply for convenience of the DEVELOPMENT. e. Driveways Permitted. i. In the case of a CORNER LOT or parcel, access shall only be provided from the intersecting street, not from Seabrook Island Road. ii. One (1) driveway may be permitted to serve an individual LOT or parcel; provided, the minimum spacing requirements of this section shall be maintained. iii. The use of shared driveways or access roads is encouraged. iv. One (1) additional driveway may be permitted for a property only as follows: (a) The PLANNING COMMISSION determines that, based on a TRAFFIC IMPACT ANALYSIS, the projected traffic volumes will warrant an additional access point and traffic operations will be improved along the road as a result; and (b) The minimum spacing requirements of this section will be met. f. Driveway Design. i. All driveways shall be designed according to the standards of the TOWN, including the provision of necessary turn radii, clear vision corners, drainage facilities, and utilities. ii. For high traffic generators or where high left-turn demand is expected, the PLANNING COMMISSION may require separate right- and left-turn egress lanes. 137 Town of Seabrook Island Development Standards Ordinance 90 iii. Where a boulevard entrance is proposed by the applicant or required by the PLANNING COMMISSION, a fully curbed island shall separate the ingress and egress lanes. The radii forming the edges on this island shall be designed to accommodate the largest vehicle that will use the driveway. The minimum area of the island shall be 180 square feet. For aesthetic purposes, the PLANNING COMMISSION may require landscaping, tolerant of street conditions, on the section outside the public right-of-way. g. Shared Driveways and Service Roads. i. Where the PLANNING COMMISSION determines that traffic operations and safety along the Seabrook Island Road corridor will be benefitted, a shared driveway or service road connecting two (2) or more properties or uses may be required. ii. A shared driveway or service road shall be within a recorded access EASEMENT. A draft of the access EASEMENT shall be provided to the TOWN for review prior to filing. iii. The number of access points along a service road shall be according to the standards of this section. The PLANNING COMMISSION may allow temporary access where the service road is not completed if a financial guarantee is provided which assures elimination of the temporary access upon completion of the service road. BUILDING permits shall not be issued until the financial guarantee has been submitted to the TOWN. h. Service Road Design Standards. Service roads shall generally be parallel to the front property line and may be located either in front of, adjacent to, or behind principal BUILDINGs. In considering the most appropriate alignment for a service road, the PLANNING COMMISSION shall consider the SETBACKs of existing and proposed BUILDINGs and anticipated traffic flow for the site. However, placement of the service road intersection with the driveway providing access to Seabrook Island Road shall be as far as possible from the street for safe and efficient operation. The separation distance between the nearest edge of the street and the nearest edge of a service road or drive aisle shall be equal to at least one-fifth of the LOT DEPTH, but no less than 60 feet. i. Access EASEMENT. The service road shall be within an access EASEMENT permitting traffic circulation between properties. This EASEMENT shall be 40 feet wide, except an access EASEMENT parallel to the PUBLIC STREET right-of-way may be 30 feet wide, if approved by the PLANNING COMMISSION. The required width shall remain free and clear of obstructions, unless otherwise approved. 138 Town of Seabrook Island Development Standards Ordinance 91 ii. Construction and materials. Service roads shall have a base, pavement, and gutter in accordance with TOWN standards for PUBLIC STREETs, except the service road shall have a minimum pavement width of at least 24 feet. iii. Parking. The service road is intended to be used exclusively for circulation, not as a parking or maneuvering aisle. The posting of "no parking" SIGNs may be required along the service road. In reviewing the site plan, the PLANNING COMMISSION may permit temporary parking in the EASEMENT area where a continuous service road is not yet available; provided, the layout allows removal of the parking in the future to permit extension of the service road. iv. Access to service road. The PLANNING COMMISSION shall approve the location of all access points to the service road; provided, a minimum separation distance of 125 feet shall be maintained between driveways along the service road. v. MAINTENANCE. Each property owner shall be responsible for MAINTENANCE of the EASEMENT and service road. i. DOUBLE FRONTAGE Lots (Through Lots). LOTs which have DOUBLE FRONTAGE shall not be permitted, except where essential to provide separation of residential DEVELOPMENT from Seabrook Island Road. An EASEMENT of at least 10 feet in width, across which there shall be no right of access, shall be required along the lot lines abutting Seabrook Island Road. No right of access shall be granted except by the PLANNING COMMISSION. 5. Landscaping. The area between any service road or driveway and the Seabrook Island Road right-of-way shall be planted as a level A BUFFER, as specified in Section 11.3. 6. SIGNs. The SIGN requirements of Article 13 shall apply; provided, however, only one (1) monument SIGN shall be permitted per parcel and shall comply with the following requirements: a. Maximum area: 12 square feet b. Maximum height: six (6) feet c. Minimum SETBACK from road right-of-way: 10 feet d. External illumination only e. Design, color, materials, and lettering shall conform to the standards adopted by the PLANNING COMMISSION for such SIGNs. 7. Lighting. Lighting shall meet the requirements of subsection 2.1 E. 8. Non-motorized Connectivity. All properties subject to the Seabrook Island Road OVERLAY DISTRICT shall provide paved connections to existing pathways for pedestrians and cyclists. D. Traffic Impact Analysis. 139 Town of Seabrook Island Development Standards Ordinance 92 1. Applicability. a. TIA Required. Unless exempted, a TRAFFIC IMPACT AN

Text truncated. Open the original for the full document.

Source: Town of Seabrook Island website. First collected Oct 17, 2026.