Agenda
Town of Seabrook Island · Charleston County · Agendas
Open the original document More from Town of Seabrook Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town Council Regular Meeting
February 24, 2026 – 2:30 PM
Watch Live on YouTube
S
eabrook Island Town Hall, Council Chambers
2001 Seabrook Island Road
Seabrook Island, SC 29455
AGENDA
CALL TO ORDER, ROLL CALL, AND FOIA STATEMENT
APPROVAL OF MINUTES
January 27, 2026 Town Council Regular Meeting
CITIZEN COMMENTS
During the first citizen comment period, any citizen may speak
pertaining to any item listed on the meeting agenda which does not
require a public hearing. Each speaker shall be limited to three minutes
in which to make his or her comments. Town council shall allow no
more than 30 minutes for citizen comments. Preference shall be given
to individuals who have signed up or otherwise notified the town
clerk/treasurer of a desire to speak prior to the start of the meeting.
REPORTS OF TOWN BOARDS COMMISSIONS, AND COMMITTEES
Advisory Committees Environment & Wildlife Committee (Raymond Hamilton)
P
ublic Safety Committee (Darryl May)
D
iscretionary Grants Committee (Patrick Faulkner)
• Recommendation to approve Program Guidelines for the
Discretionary Grants Program (Action Item)
C
ommunity Facilities & Infrastructure (Thomas Hund)
• Request to authorize the initiation of a procurement process
to engage a consultant to conduct a space and facility needs
assessment (Action Item)
REPORTS OF TOWN OFFICERS AND STAFF
Mayor’s Report
S
taff Reports
Report of the Mayor
• Charleston County Transportation Sales Tax Referendum
• Ordinance 2026-01
R
eport of the Town Administrator
• Strategic Planning Workshop, March 10th – 10:00 am
1
Report of the Finance Director
Report of the Planning Director
Report of the Community Affairs Director
CITIZEN COMMENTS
During the second citizen comment period, any citizen may speak
pertaining to any town matter, except personnel matters. Each
speaker shall be limited to three minutes in which to make his or her
comments. Town council shall allow no more than 30 minutes for
citizen comments. Preference shall be given to individuals who have
signed up or otherwise notified the town clerk/treasurer of a desire to
speak prior to the start of the meeting.
EXECUTIVE SESSION ITEMS
Pursuant to SC Code § 30-4-70 (a)(2), Discussion of items incident to
proposed contractual arrangements (Beach Patrol Services RFP)
Please Note – Upon returning to open session, the Town Council may
take action on items discussed in Executive Session.
COUNCIL COMMENTS
ADJOURNMENT
2
Town Council Regular Meeting
January 27, 2026 – 2:30 PM
View Meeting on YouTube
Seabrook Is
land Town Hall, Council Chambers
2001 Seabrook Island Road
Seabrook Island, SC 29455
MINUTES
CALL TO ORDER Mayor Kleinman called the meeting to order at 2:32 pm.
ROLL CALL Council Members Present: Bruce Kleinman; Mayor, Patrick Faulkner,
Thomas Hund, and Raymond Hamilton
Town Staff Present: Joe Cronin (Town Administrator), Abby Grooms
(Communications and Events Coordinator), Tyler Newman (Zoning
Administrator), Amber Howard (Finance Director), and Peter Wiggins
(Town Clerk).
FOIA STATEMENT The Town Clerk confirmed that the meeting was advertised in
compliance with the requirements of the South Carolina Freedom of
Information Act. Agendas were posted and furnished to news media
and all others requesting notification.
ELECTION OF MAYOR PRO TEMPORE
Mayor Kleinman motioned to nominate Darryl May as Mayor Pro-
Tempore for a two-year term.
Mayor Kleinman’s motion was APPROVED unanimously.
OTHER ACTION ITEMS
Shorebird Steward Program Mr. Hamilton motioned to approve the Town of Seabrook Island’s
statement of support for the Shorebird Steward Program, seconded by
Mr. Faulkner.
Mr. Hamilton’s motion was APPROVED unanimously.
APPROVAL OF MINUTES
January 12, 2026 Mr. Faulkner motioned to approve the minutes of January 12, 2026,
seconded by Mr. Hamilton.
Mr. Faulkner’s motion was APPROVED unanimously.
PUBLIC HEARING ITEMS
3
Ordinance 2025-11; An
ordinance amending the
Town Code for the Town of
Seabrook Island, South
Carolina; Chapter 2,
Administration; Article VI,
Financial Administration;
Division 1, Generally;
Section 2-608, Fund Balance
Policy; so as to amend the
town’s Fund Balance Policy
Mayor Kleinman opened the Public Hearing on Ordinance 2025-11.
Upon hearing
there was no one present who wished to speak on
Ordinance 2025-11, Mayor Kleinman closed the public hearing.
REPORTS OF TOWN BOARDS, COMMISSIONS, AND COMMITTEES
Environment & Wildlife
Public Safety
Discretiona
ry Grants
Community Fac
ilities &
Infrastructure
Seabrook Island Utility
Commission
Mr. Hamilton stated the first committee meeting of 2026 is scheduled
for February 5, at 10:00 am.
He announced
that Camp St. Christopher is having a Wildlife
Workshop on February 3, at 6:00 pm. He stated that the workshop will
have information on biodiversity and how humans can coexist with
wildlife. Mr. Hamilton also announced that Jeff Davis of SIPOA had a
great article in the January edition of “Currents” on how humans can
coexist with coyotes.
Mayor Kleinman sta
ted he chaired a meeting of the Public Safety
Committee in Mr. May’s absence. He stated the committee was
advised on the upcoming Beach Patrol Services RFP.
Mr. Faulkner st
ated the committee met on January 21. He stated the
committee discussed the powers and duties granted to the committee
under the current ordinance. He added that the committee will be
recommending the Conservation and Community Promotions Grant
Programs be merged into one program. He also added the committee
will be recommending the grant limit per applicant be raised to
$5,000.00 from $2,500.00. He closed by stating the committee will be
recommending the town enter into a Memorandum of Agreement
with each applicant that lays out the terms and conditions of the
applicant receiving grant funding.
Mr. Hund stat
ed the first committee meeting is scheduled for January
29. He stated there is work to do related to prioritizing the powers and
duties of the committee. He stated the committee will be discussing
the Seabrook Island Road project, as well as the need for a new town
hall. He stated he also wanted the committee to discuss a vision for
the committee that allows the members to be involved in other
projects on the island such as the Seabrook Island Master Plan.
4
Mr. Ferland updated the council on SIUC’s finances for December
2025.
Mr. Ferland s
tated the Pond Project is complete. He stated the project
consisted of approximately $12 million of work. He added the work on
Pump Station #1 is complete.
Mr. Hamilton ask
ed if there is any major work planned for 2026.
Mr. Ferland stated there is other work planned for two pump station
rebuilds, as well as other regular maintenance planned for the coming
year.
REPORTS OF TOWN OFFICERS & STAFF
Mayor Mr. Kleinman stated he wanted to address the Town’s efforts to
acquire funding through the proposed Transportation Sales Tax (TST)
for the Seabrook Island Road Project. He reminded residents that the
council passed a resolution in 2025 that supported the Town pursuing
funding through the TST program. He urged Seabrookers to submit
public comments to Charleston County in support of the project. Mr.
Kleinman closed by stating that residents, visitors, and business
owners have been paying into the TST program and the Town has yet
to receive funding for a project within its municipal limits.
Mr. Kleinman re
minded council that the Town has scheduled a
strategic planning workshop for March 10. He continued by urging
council to formulate their own list of priorities prior to the workshop
so the meeting could be both more efficient and productive.
Mr. Hamilton ask
ed if the Town could submit an example form letter
for residents to forward to Charleston County.
Mac McQuillin, Town A
ttorney, stated the Town could urge residents
to voice their opinion in favor of a specific project. He continued by
saying the Town should be cautious not to use public resources to
influence the outcome of any potential referendum.
Mr. Kleinman s
tated he didn’t think that having residents submit a
form letter was a great way to gather support for the road project. Mr.
Kleinman stated he would work with the Town’s Communications and
Events Coordinator to decide how best to gather support for the
project. Mr. Kleinman closed by stating that nothing is better than
word of mouth support.
Mr. Hamilton st
ated his idea was to compress the recent Pelican’s
Brief email and compress it to three bullet points that could be
submitted as public comments to Charleston County.
5
Town Administrator
Finance Direc
tor
Zoning Administ
rator
Mr. Cronin stated the Town has issued a Request for Proposal for
Beach Patrol Services. He continued by saying the proposal asked the
bidder to submit proposals for April through September service as has
been practiced in the past, but also includes a request to submit a cost
for year-round service. He stated he had been contacted by three
prospective bidders. He stated the Public Safety Committee will be the
recommending body, and council will award the contract.
Mr. Cronin sta
ted that now the Seafields facility is complete, there
needs to be a post-construction inspection of the right-of-way. The
inspection will assess any damage to the right-of-way that is a result of
the construction of the new facility. He stated the Town is using G.
Robert George and Associates for the damage assessment/post-
construction inspection.
Ms. Howard ga
ve an update on the Town’s financials as of December
31, 2025.
Mr. Hamilton
asked what percentage of the fund balances is interest.
Ms. Howard stat
ed in 2025, the Town received $475,000 in interest
from the Local Government Investment Pool.
Mr. Hamilton ask
ed why the local accommodations tax payments
received by the Town have increased, while the State
Accommodations Tax payments have decreased.
Mr. Cronin stat
ed the local accommodations tax is a newer tax. He
stated that the Town continues to see better compliance, and thus
payments to the Town continue to increase relative to the
growth/decline of State Accommodations Tax payments.
Mr. Newman gave an update on Zoning and Code Enforcement
activities since the December meeting.
ORDINANCES FOR SECOND READING
Ordinance 2025-11: An
ordinance amending the
Town Code for the Town of
Seabrook Island, South
Carolina; Chapter 2,
Administration; Article VI,
Financial Administration;
Division 1, Generally;
Section 2-608, Fund Balance
Policy; so as to amend the
fund balance policy
Mr. Cronin gave a brief history of the ordinance to update Mr. Hund
and Mr. Faulkner.
Mr. Hund motioned t
o pass Ordinance 2025-11 at second reading,
seconded by Mr. Hamilton.
Mr. Hund’s motion was APPROVED unanimously.
6
ADJOURNMENT There being no further business before the council, Mr. Kleinman
declared the meeting adjourned at 3:34 pm.
Peter D. Wigg
ins II, MPA
Town Clerk
7
TOWN OF SEABROOK ISLAND
REQUEST FOR PROPOSALS (RFP) 2026-01
BEACH PATROL SERVICES
[REVISION #1: JANUARY 20, 2026]
The Town of Seabrook Island is inviting s ealed proposals from qualified contractors for all labor,
equipment and materials to provide professional beach patrol services on the beaches of Seabrook Island.
A copy of the RFP package, consisting of (1) General Terms and Conditions, (2) Special Terms and
Conditions, (3) Scope of Services, (4) Form of Contract, (5) Insurance Requirements and (6) Non-Collusion
Oath, may be obtained at the Seabrook Island Town Hall during normal business hours, or from the Town
website at https://www.townofseabrookisland.org/bids--proposals.html. Except as otherwise specifically
noted, the entire package must be used in preparing proposals.
Issue Date: January 16, 2026
Solicitation Number: RFP 2026-01
Description of Services: The Town of Seabrook Island is inviting proposals from qualified
firms to provide professional beach patrol services on the
beaches of Seabrook Island
Bid Security: Not Required
Pre-Bid Conference: Not Required
Due Date For Proposals: February 13, 2026, 2:00 PM
Public Opening Date: February 13, 2026, 2:30 PM
Public Opening Location: Seabrook Island Town Hall
Town Council Chambers
2001 Seabrook Island Road
Seabrook Island, SC 29455
8
RFP 2026-01 RFP Page 1 of 8
Town of Seabrook Island
REQUEST FOR PROPOSALS
GENERAL TERMS AND CONDITIONS
1. PREPARATION, SUBMISSION AND WITHDRAWAL OF PROPOSALS
A. There is no standard form of proposal. Proposals must be typewritten or computer -
generated using a word processor or similar program . The information contained in the
proposal should include, but is not limited to:
(i) the official name, mailing address, email address and telephone number
of the individual, firm, or corporation under which the business is
conducted, as well as all legal entities which will participate in the
provision of goods or services (hereinafter “Bidder” or “Bidders”);
(ii) the form of organization of the Bidder, whether individual, firm,
partnership, corporation, joint venture or other legal entity;
(iii) all affiliations, parent -subsidiary relationships and corporate identities ,
including the names of the principals of such legal entities, must be fully
disclosed and explained;
(iv) a straightforward, concise description of Bidder’s qualifications, current
and prior experience , and ability to satisfy the requirements of this
Request for Proposal s (hereinafter “RFP”), including, specifically, the
Bidder’s ability to perform the services set forth in Attachment B of this
RFP (hereinafter “Services”);
(v) a description of the size of the firm, the location of the office(s) from
which the Services are to be performed, and the number and
qualification of the staff to be employed in performance of the Services.
The description should identify the principal supervisor and management
staff who will be assigned to the Services and indicate any special skills,
education, training and experience that would be applicable to the
Services;
(vi) a description of the vehicles and equipment which will be used by the
Bidder in providing the Services;
(vii) an acknowledgement of receipt of the entire RFP Package;
(viii) the price the Bidder will charge for performing the Services during the
two (2) year initial term . The proposal must contain all pricing
information relative to providing the goods and /or performing the
Services described in the RFP. The all-inclusive price is to contain all direct
and indirect costs , including all out -of-pocket expenses , for which
reimbursement is anticipated . Any price increases beyond the two (2)
9
RFP 2026-01 RFP Page 2 of 8
Town of Seabrook Island
year initial term shall be subject to approval by the Town of Seabrook
Island (hereinafter “Town”); and
(ix) A list of other related contracts performed in the last three (3) years
similar to the proposed Services covered by this RFP. Indicate the date,
the name and telephone number of the principal contact.
All proposals must include the RFP solicitation number and must be signed by an official
authorized to bind the Bidder.
All Bidders must submit one paper copy and one digital copy (PDF format on a USB
drive) of the proposal.
B. Mailed or hand-delivered proposals must be submitted in a sealed envelope to the Town
of Seabrook Island , Attn: Town Administrator, 2001 Seabrook Island Road, Seabrook
Island, South Carolina 29455. Each sealed envelope containing a proposal shall be marked
on the outside with the Bidders ’ complete name, address, and the solicitation number
(“RFP 2026-01”). Failure to do so may result in premature opening of, or a failure to open,
such proposal.
C. Proposals must be received in the Office of the Town Administrator by 2:00 PM on
February 13, 2026. Proposals received after this date and time are considered “Late
Proposals.” “Late Proposals” will not be opened or considered.
D. Proposals may be withdrawn by written request by the Bidder to the Town Administrator
prior to the time set for the public opening of proposals.
E. Bidders shall promptly notify the Town Administrator in writing as soon as possible, but
not later than 2:00 pm on January 23, 2026 , of any ambiguity, inconsistency or error
which they may discover upon examination of the RFP documents or the project premises
and local conditions.
F. Bidders requiring clarification or interpretation of the RFP documents shall make a written
request to the Town Administrator no later than 2:00 PM on January 23, 2026.
G. Any interpretation, correction or change to the RFP documents will be made and posted
on the Town’s website as an addendum to the RFP. No addenda will be posted after 2:00
PM on January 30, 2026.
H. No substitution s or amendments will be considered after the awarding of a contract
except by contract amendment or change order.
I. The Town seeks a single, qualified company to be responsible for the provision of the
Services, although the Town reserves the option to award portions of the project to
multiple bidders if such approach is deemed to be most advantageous to the Town .
Therefore, any one proposal submitted by more than one company will be deemed to be
a proposal for a joint venture between or among the companies unless the proposal
clearly and unequivocally describes that only one firm proposes to act as principal and the
10
RFP 2026-01 RFP Page 3 of 8
Town of Seabrook Island
other firm(s) contractual position is clearly defined. The companies submitting as a joint
venture will be held jointly and severally responsible for the entire project and will not be
permitted to limit their liability to the Town.
K. The following attachments are included in the RFP Package:
(i) Attachment A: Special Instructions/Terms and Conditions
(ii) Attachment B: Scope of Services/Specifications
(iii) Attachment C: Sample Contract
(iv) Attachment D: Insurance Requirements
(v) Attachment E: Non-Collusion Oath
2. NON-COLLUSION OATH
Every proposal must be accompanied by a notarized affidavit of non -collusion, executed by the
Bidder or, in the case of a corporation, by a duly authorized representative of said corporation.
The Non-Collusion Oath is provided in Attachment E of this RFP.
3. BIDDER REPRESENTATIONS
By submitting a proposal, each Bidder represents that:
A. The Bidder has read and understands this RFP (including all specifications and
attachments) and that its proposal is made in accordance therewith.
B. The Bidder has reviewed the RFP, has become familiar with the local conditions under
which the Services are to be performed, and has correlated personal observations with
the requirements of the proposed contract documents.
C. The proposal is based o n the terms, materials, and equipment required by this RFP,
without exception.
D. The Bidder is qualified to provide the Services and, if awarded the contract, will do so in
a professional, timely manner using Bidder's best skill and attention.
E. If Bidder is awarded the contract, it will execute the formal contract called for herein.
F If Bidder is awarded the contract, Bidder agrees that:
(i) it will provide the insurance coverage as requir ed in Attachment D,
Insurance Requirements, and
(ii) if the Services or any part thereof are not completed within the required
time period, the Bidder will be liable for all damages in accordance with
11
RFP 2026-01 RFP Page 4 of 8
Town of Seabrook Island
the terms of the formal contract.
G. Bidder’s staff is knowledgeable about and experienced in performing the Services
required in this RFP, and the Bidder warrants that it will use its best skill and attention to
provide the Services in a professional and timely manner.
4. BIDDER'S QUALIFICATIONS
Before a proposal is considered for award, the Bidder may be requested by the Town to submit a
statement providing additional information regarding their previous experience in performing
comparable Services.
5. EVALUATION CRITERIA
Bidders meeting the minimum requirements set forth in this RFP will have their proposal
evaluated and scored using the evaluation criteria stated below. Bidders may be required to
provide oral presentations to the Town’s Public Safety Committee, who shall serve as the
Evaluation Committee for this RFP. The Public Safety Committee meeting is tentatively scheduled
for February 17, 2026, at 10:00 AM.
Qualifications & Experience 30 Points
Project Approach 20 Poins
License & Training Requirements 10 Points
Resources & Financial Ability 10 Points
Cost Proposal 30 Points
TOTAL 100 Points
6. AWARD OF CONTRACT
A. Award of the contract will be made consistent with the criteria in the Town’s applicable
ordinance, to the lowest responsive and responsible Bidder(s) whose proposal,
conforming to the RFP, is deemed most advantageous to the Town, price and other
factors considered.
B. The Town reserves the right to (1) reject any or all proposals and any part of a proposal;
(2) waive informalities, technical defects, and minor irregularities in proposals received
not involving price ; (3) interview Bidders prior to selecting a successful Bidder; and (4)
award the proposal(s) received on the basis of individual items or groups of items or the
entire list of items.
7. NOTICE OF AWARD OF CONTRACT
The successful Bidder will be notified of acceptance of proposal by a wr itten notice of award
(hereinafter, “Notice of Award”) of the contract. The successful Bidder shall not undertake any
Services, and the Town will not be responsible for payment for any Services whatsoever
undertaken by successful Bidder prior to issuance of the notice to proceed (hereinafter, “Notice
to Proceed”.)
12
RFP 2026-01 RFP Page 5 of 8
Town of Seabrook Island
The successful Bidder shall be required to submit acceptable insurance certificat e(s) and
endorsement(s) within five (5) business days after the issuance of the Notice of Award.
8. CONTRACT DOCUMENT
The successful Bidder shall be required to execute a formal contract (the “ Contract”) within five
(5) business days after issuance of a Notice of Award , unless extended by mutual consent . It is
anticipated that the Contract shall be virtually identical in substance and form to the Sample
Contract which is attached hereto as Attachment C (Sample Contract ). The only anticipated
changes from Attachment C (Sample Contract) will be to include additional exhibits, to fill in the
blanks to identify the successful Bidder, and terms relating to compensation, or to revise the
contract to accommodate corrections, changes in the scope of Services, or changes pursuant to
addenda issued prior to the public opening.
Bidders should raise any questions regarding the terms of the Contract or submit the specific
language of any requested change to the terms and conditions of the Contract , together with
their submitted proposal.
Because the signed contract will be substantively and substantially derived from Attachment C
(Sample Contract), Bidder is urged to seek independent legal counsel as to any questions about
the terms, conditions or provisions contained in Attachment C (Sample Contract ), before
submitting a proposal. Again, Attachment C (Sample Contract ), contains important legal
provisions and is considered part and parcel of this RFP. Failure or refusal to sign aforesaid
Contract shall be grounds for the Town to revoke any Notice of Award which has been issued,
forfeit bid security, and award the Contract to another Bidder.
If Bidder generally uses a n industry standard form of contract, in lieu of submitting requested
changes to the Contract, a copy of the industry standard form of contract proposed by the Bidder
may be submitted along with the Bidder’s Proposal.
Any requested changes to the Contract language may affect the Town’s consideration of the
proposal. The Town will be the sole judge as to whether to accept any changes to the terms and
conditions of the Contract, or whether to accept an alternative form of contract. No changes to
the Contract will be considered after the proposal has been accepted.
9. NOTICE TO PROCEED
A Notice to Proceed will be issued after the successful Bidder has executed the Contract and has
submitted acceptable performance and payment bonds (if applicable) to the Town as well as other
submittals specified herein and in the Contract which are required to be delivered before the
Notice to Proceed is issued.
The successful Bidder shall not deliver any equipment to the work site or commence work until
the successful Bidder has received a written Notice to Proceed from the Town Administrator.
10. STATE AND LOCAL TAXES
Except as otherwise specifically provided for in the Contract, Contract prices shall include all state
13
RFP 2026-01 RFP Page 6 of 8
Town of Seabrook Island
and local taxes applicable to the Services provided.
The successful Bidder shall calculate, if applicable, that portion of the Contract which is subject to
the South Carolina sales and/or use tax, which amount shall be itemized and shown on all invoices
and shall be paid to South Carolina Department of Revenue (SCDOR) by the successful Bidder. If
the successful Bidder is a non-South Carolina company, the Town will withhold said amount from
all invoices and remit payment to the SCDOR, unless successful Bidder furnishes Town with a valid
South Carolina Use Tax Registration Certificate Number.
The successful Bidder shall indemnify and hold harmless the Town for any loss, cost, or expense
incurred by, levied upon or billed to the Town as a result of the successful Bidder’s failure to pay
any tax of any type due in connection with this Contract.
The successful Bidder shall ensure that the above sections are included in all subcontracts and
sub-subcontracts and shall ensure withholding on out of state sub and sub -subcontractors to
which withholding is applicable.
11. PERMITS AND LICENSES
The successful Bidder, and any subcontractor, shall, without additional expense to the Town, be
responsible for obtaining and maintaining all necessary licenses and permits required by the State
of South Carolina or the Town or any other authority having j urisdiction over the Services. Prior
to execution of a contract, the successful Bidder and subcontractor may be required to provide a
copy of its current applicable Contractor’s Licenses issued by the State of South Carolina and the
Town.
12. SUBCONTRACTORS
A. If any subcontractors will be used for this project, the successful Bidder shall provide to
the Town Administrator a list of names of any of the intended subcontractors, the
subcontractor's applicable license number(s), and a description of the Services to be done
by each subcontractor.
B. The successful Bidder shall not substitute other subcontractors without the written
consent of the Town Administrator.
C. The successful Bidder shall be responsible for all services performed by a subcontractor
as though they had been performed by the successful Bidder. Responsibilities include, but
are not limited to, compliance with any applicable licensing regulations.
D. If at any time the Town Administrator determines that any subcontractor is incompetent
or undesirable, he or she shall notify the successful Bidder accordingly, and the successful
Bidder shall take immediate steps for cancellation of the subcontract and replacement of
the subcontractor.
E. Nothing contained in any subcontract resulting from this RFP shall create any contractual
relationship between any subcontractor of the successful Bidder and the Town.
14
RFP 2026-01 RFP Page 7 of 8
Town of Seabrook Island
F. It shall be the successful Bidder’s responsibility to ensure that all terms required in the
attached Contract are incorporated into all subcontracts.
13. INSURANCE REQUIREMENTS
The successful Bidder, at its own expense, shall at all times during the term of the Contract,
maintain insurance as r equired in Attachment D (Insurance Requirements), which is attached
hereto and incorporated by reference. The Town shall not execute the Contract until the
successful Bidder has submitted acceptable Insurance certificate(s) and endorsement(s) , which
must be submitted within five (5) business days of receipt of the Notice of Award, unless extended
by mutual consent, and which reflect that the required coverages are in place and that all
premiums have been paid. Refusal or failure to submit such insurance certificat e(s) and
endorsement(s) shall constitute grounds for the Town to revoke its Notice of Award, forfeit bid
security, and award the Contract to another Bidder. The Town may contact the successful Bidder’s
insurer(s) or insurer(s)' agent(s) directly at any time regarding the successful Bidder’s coverages,
coverage amounts, or other such relevant and r easonable issues related to the Contract. The
successful Bidder shall also require any sub-contractors to carry the same coverages in the same
amounts.
Faxed Insurance certificate(s) and endorsement(s) will be accepted if received no later than the
time of contract execution and the original documents are received within one (1) business day
after receipt of the fax transmittals.
The Town must be advised immediately of any lapses or changes in required coverage.
14. INDEMNIFICATION
Except for expenses or liabilities arising from the negligence or intentional acts of the Town, the
successful Bidder shall expressly agree to indemnify, defend and hold the Town harmless against
any and all expenses and liabilities arising out of the performance or default hereunder as follows:
The successful Bidder shall expressly agree that to the extent that there is a causal relationship
between its negligence, action or inaction, or the negligence, action or inaction of any of its
employees or any person, firm or corporation directly or indi rectly employed by the successful
Bidder and any damage, liability, injury, loss or expense (whether in connection with bodily injury
or death or property damage) that is suffered by the Town and/or its officers or employees or by
any member of the public, to indemnify, defend and save the Town and its officers and employees
harmless from and against any and all liabilities, penalties, demands, claims, lawsuits, losses,
damages, costs, and expenses arising directly or indirectly out of the performance of the Contract
to be entered into by the parties. Such costs are to include, without limitation, defense,
settlement and reasonable attorney’s fees incurred by the Town and its employees. This
obligation to indemnify shall include, without limitation, bodily injuries or death occurring to the
successful Bidder’s employees and any person, directly or indirectly employed by the Successful
Bidder (including, without limitation, any employee of any subcontractor), the Town’s officers or
employees, the employees of any other independent contractors, or occurring to any member of
the public. When the Town submits notice, the successful Bidder shall promptly defend any
aforementioned claim, demand or lawsuit. This obligation shall survive the suspension or
termination of the Contract resulting from this RFP. The limits of insurance required in such
15
RFP 2026-01 RFP Page 8 of 8
Town of Seabrook Island
Contract shall not limit the successful Bidder’s obligation of indemnification. The recovery of costs
and fees all extend to those incurred in the enforcement of this indemnity.
15. MATERIALS AND WORKMANSHIP
If equipment, materials and supplies are to be included as part of the Services provided, all
equipment, materials and s upplies incorporated in the Services and covered by the RFP and
provided by the successful Bidder are to be of the most suitable grade for the purposes intended.
When requested, the successful Bidder shall furnish the Town for approval the name of the
manufacturer, the model number and other identifying data and information respecting the
performance, capacity and rating of the machinery and other mechanical equipm ent which is
incorporated in the Services. Machinery, equipment and materials installed and / or used without
the Town’s prior approval shall be at risk of rejection.
16. COMPETITIVE BIDDING & BID SECURITY
Purchases and/or contracts exceeding $5,000 shall be made in accordance with the competitive
bidding procedures set forth in the Town’s ordinances, including the requirements for bid
security. Bid security may be waived provided notice of such is given by the Town when bids are
solicited.
17. PUBLIC ACCESS TO PROCUREMENT INFORMATION
Subject to the requirements of the Freedom of Information Act, commercial or financial
information obtained in response to this RFP that is deemed privileged and confidential by the
Bidder and is so marked in a conspicuous manner will not be disclosed. It is therefore the
responsibility of each Bidder to mark as “CONFIDENTIAL” each specific part of the proposal that
it considers to be proprietary and confidential.
18. NON-DISCRIMINATION
The successful Bidder shall not discriminate against any individual based upon age, sex, race,
color, national origin, religion, genetic information, military/veteran status, or disability.
19. DRUG FREE WORKPLACE
The successful Bidder shall comply with the South Carolina Drug-Free Workplace Act, Section 44-
107-10 et. seq., South Carolina Code of Laws, as amended.
20. INCORPORATION BY REFERENCE
The contents of this RFP, and any addenda, will become part of the Contract for the Services.
16
RFP 2026-01 RFP Attachment A: Page 1 of 1
Town of Seabrook Island
ATTACHMENT A
SPECIAL INSTRUCTIONS/ TERMS AND CONDITIONS
1. PRE-BID CONFERENCE:
A pre-bid conference is not required.
2. SUBMITTAL DEADLINE:
Proposals will be received until 2:00 PM, on February 13, 2026 (as indicated on the official clock
in the office of the Town Administrator ) after which time all proposals will be publicly open ed
and read at the date and time specified in the RFP. Bidders are invited, but are not required, to
attend the public opening.
3. ADDITIONAL INFORMATION, INQUIRIES & ADDENDA
Questions or clarifications concerning this RFP should only be directed to:
Joseph Cronin
Town Administrator
Town of Seabrook Island
2001 Seabrook Island Road
Seabrook Island, SC 29455
Phone: (843) 768-9121
Email: jcronin@townofseabrookisland.org
The deadline for the submittal of questions or requests for clarification is 2:00 PM on January 23,
2026.
Any interpretation, correction or change of the RFP documents will be made and posted on the
Town’s website (https://www.townofseabrookisland.org/bids--proposals.html) as an addendum
to the RFP. No addenda will be posted after 2:00 PM on January 30, 2026.
4. TERM OF AGREEMENT
A two (2) year initial term with up to five (5) one-year renewal options is contemplated, subject
to an annual review, the satisfactory negotiation of terms and pricing (including, if applicable, any
amendments to the days and hours the Services are provided and pricing acceptable to the Town),
and the annual appropriation of funds by the Town Council.
17
RFP 2026-01 RFP Attachment B – Page 1 of 5
Town of Seabrook Island
ATTACHMENT B
SCOPE OF SERVICES
SERVICES: The Town of Seabrook Island is inviting proposals from qualified firms to provide for the safety
of residents and visitors in need of assistances on all beaches within the Town. In connection therewith,
the required Services shall include the following:
1. Render assistance to those in need including, but not limited to: first aid assistance; water
rescue; swim assistance; boat assistance; treatment of minor injuries (including stings);
reuniting lost persons; and responding to inquiries or requests for information from the
public;
2. When necessary, c all for assistance from appropriate public safety agencies (e.g., law
enforcement, emergency management services, fire department, U.S. Coast Guard, etc.),
and report any observed illegal or dangerous activities to the appropriate authorities in a
timely manner;
3. Enforce the Town’s Beachfront Management Ordinances ( as specified in Chapter 32,
Article II, of the Town Code for the Town of Seabrook Island), as well as any other
restrictions or regulations lawfully imposed by the Town on users of the beach. To provide
for this service, one or more of the Contractor’s employees shall be designated by the
Town Council as Code Enforcement Officers of the Town . Such employee (s) shall be
responsible for informing beachgoers not observing the Town’s ordinance s of their
responsibility to do so, and for the issuance of citations in appropriate c ircumstances.
Employees shall issue citations for violation of the Town’s beach ordinance, consistent
with the policies adopted by the Town and communicated to the Contractor from time to
time. At least one code enforcement officer shall be present on the beach whenever
beach patrol personnel are present. When necessary, employees may be required to
appear and provide testimony in Municipal Court.
4. To remove, or assist with the removal of, litter, equipment and debris on the beach;
5. To report, or assist with reporting of, injured wildlife to appropriate state agencies and/or
non-profit organizations;
6. Provide all Services in a courteous and professional manner; and
7. Provide weekly activity logs to the Town in an agreed upon format. Significant events shall
be reported both to the Town Administrator and Mayor as promptly as is reasonably
possible.
GENERAL REQUIREMENTS. The Services provided by the Contractor and its employees shall conform to
the following general requirements:
1. UNIFORMS: All employees shall wear matching uniforms approved by the Town.
Uniforms shall display the Town logo. All employees shall maintain a professional
18
RFP 2026-01 RFP Attachment B – Page 2 of 5
Town of Seabrook Island
appearance at all times . The Contractor shall remove any employee deemed
inappropriate by the Town.
2. QUALIFICATIONS & TRAINING:
a. The Contractor shall maintain the minimum requirements for open water
beach patrol and lifeguard agencies in accordance with nationally
accepted standards set forth by the United States Lifesaving Association;
b. The Contractor’s employees shall possess the physical and mental ability
to adequately and professionally perform the Services.
c. Each employee involved in providing the Services shall possess and
maintain the following:
i. USLA open water lifeguard certification;
ii. CPR/AED certification;
iii. first aid training consistent with United States Life Savings
Association Guidelines;
iv. a valid South Carolina driver’s license;
v. background checks performed by the Contractor; and
vi. code enforcement training provided by the Town.
d. All employees shall be adequately trained in water rescue.
e. The Town shall conduct code enforcement training both on an annual
basis and for all new employees. The Contractor shall arrange for all
employees to attend code enforcement training to become familiar with
the Town’s beach ordinance s. New employees must be trained on the
beach ordinances before being assigned to Services.
f. Copies of employee records/certifications must be on file with the Town
Administrator prior to employee assignment.
g. Supervisors will be identified to the Town in advance and must be present
during each employee shift.
3. EQUIPMENT:
a. The Contractor shall provide all necessary safety, rescue and medical
equipment to provide the Services. The safety equipment must include,
but is not limited to: rescue cans, first aid kits, whistles and binoculars.
At least one automatic external defibrillator (AED) will be supplied by the
Town and shall remain on the beach any time employees are present.
The Contractor shall inspect the AED weekly for serviceability. The
Contractor may supply its own AED(s) in lieu of using the AED provided
by the Town; provided the AED(s) are of equal or higher quality, and
subject to prior approval by the Town Administrator.
19
RFP 2026-01 RFP Attachment B – Page 3 of 5
Town of Seabrook Island
b. Contractor’s employees shall patrol the beach by driving Contractor
owned vehicles approved by the Town Administrator. Vehicles shall be
equipped with four -wheel drive and capable of carrying the necessary
equipment. Vehicles shall have the ability to transport medical
emergencies with the aid of a backboard via the bed of the vehicle. All
vehicles shall have identifying decals, including a Town Logo, which is
easily visible to beach goers.
c. The Contractor’s employees shall have the ability to patrol and respond
to water emergencies by operating a Contractor owned and maintained
watercraft equipped with equipment for water rescue.
d. The Town will supply the Contractor’s employees with 800 mHz portable
radios to allow communication with the Town and other agencies . The
Contractor will be responsible for the cost of any damage to the radios
caused by abuse or misuse by the Contractor’s employees.
WORK SITE: The Services shall be provided on the Town’s beach es, dunes, and waterways, which for
purposes of this RFP are defined as follows:
1. ATLANTIC OCEAN: That area lying between the high-tide line and the low-tide line of
the Atlantic Ocean and extending one mile seaward of the low-tide line of the Atlantic
Ocean.
2. NORTH EDISTO RIVER: That area lying between the high-water mark and the low-water
mark of the North Edisto River.
3. CAPTAIN SAMS INLET: That area lying between the high-water mark of Captain Sams
Inlet to the point equidistant from the high -water mark of each strand on both sides of
the inlet (ie. halfway between the high-water mark on the Seabrook Island side and the
high-water mark on the Kiawah Island side).
4. EXCLUSIONS: For the avoidance of doubt, the Services shall not exclude calls for
assistance in other navigable waterways surrounding the Town.
DAYS & HOURS OF SERVICE: As part of this RFP, the Town is requesting pricing for two (2) service
alternatives. Responsive Bidders must provide pricing for both alternatives. The alternative selected by
the Town will be at the sole discretion of the Mayor and Council at the time of contract award.
1. ALTERNATIVE #1: PEAK SEASON SERVICE ONLY
a. Early Season
• Dates: April 1 through the Thursday preceding Memorial Day
• Shifts Per Day: 1
• Daily Staffing:
o Vehicles: 2
o Personnel: 2 (1 Per Vehicle)
20
RFP 2026-01 RFP Attachment B – Page 4 of 5
Town of Seabrook Island
o On-Beach (Start Time): 9:30 AM
o Off-Beach (End Time): 4:30 PM
o Total Coverage: 7 Hours
b. Mid-Season
• Dates: Friday preceding Memorial Day through the second Sunday in August
• Shifts Per Day: 2 (AM & PM), with scheduled overlap
• Shift #1 (AM):
o Vehicles: 2
o Personnel: 2 (1 Per Vehicle)
o On-Beach (Start Time): 8:30 AM
o Off-Beach (End Time): 3:30 PM
o Total Coverage: 7 Hours
• Shift Overlap:
o Vehicles: 2
o Personnel: 4 (2 Per Vehicle)
o Overlap (Start Time): 12:30 AMPM
o Overlap (End Time): 3:30 PM
o Total Overlap: 3 Hours
• Shift #2 (PM):
o # Vehicles: 2
o # Personnel: 2 (1 Per Vehicle)
o On-Beach (Start Time): 12:30 PM
o Off-Beach (End Time): 7:30 PM
o Total Coverage: 7 Hours
c. Late Season
• Dates: Monday following the second Sunday in August through Labor Day
September 30
• Shifts Per Day: 1
• Daily Staffing:
o Vehicles: 2
o Personnel: 2 (1 Per Vehicle)
o On-Beach (Start Time): 9:30 AM
o Off-Beach (End Time): 4:30 PM
o Total Coverage: 7 Hours
2. ALTERNATIVE #2: YEAR-ROUND SERVICE
a. Early Season
• Dates: April 1 through the Thursday preceding Memorial Day
• Staffing and hours identical to Alternative #1, Early Season
b. Mid-Season
• Dates: Friday preceding Memorial Day through the second Sunday in August
• Staffing and hours identical to Alternative #1, Mid-Season
21
RFP 2026-01 RFP Attachment B – Page 5 of 5
Town of Seabrook Island
c. Late Season
• Dates: Monday following the second Sunday in August through Labor Day
September 30
• Staffing and hours identical to Alternative #1, Late Season
a. Off-Season
• Dates: Tuesday following Labor Day through April 1 October 1 through
March 31
• Shifts Per Day: 1
• Daily Staffing:
o Vehicles: 1
o Personnel: 1
o On-Beach (Start Time): 9:30 AM
o Off-Beach (End Time): 4:30 PM
o Total Coverage: 7 Hours
22
RFP 2026-01 RFP Attachment C – Page 1 of 13
Town of Seabrook Island
ATTACHMENT C
FORM OF CONTRACT
STATE OF SOUTH CAROLINA ) CONTRACT
)
TOWN OF SEABROOK ISLAND ) BEACH PATROL SERVICES
THIS CONTRACT (hereinafter the “ Contract”) is made and entered into this _____ day of
____________________, 20__, by and b etween the TOWN OF SEABROOK ISLAND , South Carolina, a
public body corporate and politic and political subdivision of the State of South Carolina, (hereinafter the
"Town") and ____________________ [NAME OF COMPANY/INDIVIDUAL ], a ______ [ State Name ]
____________________ [ Sole Proprietorship/Partnership/Corporation, Limited Liability Corporation
(choose one)], the address of which is ____________________ [Street, City, State, Zip ] (hereinafter the
"Contractor"), (“Party” as to each; collectively the “Parties”).
W I T N E S S E T H:
WHEREAS, the Town wishes to contract for beach patrol services (“ Services”) more specifically
described in Exhibit C: Scope of Services; and
WHEREAS, the Contractor has represented to the Town that its staff is qualified to provide the
Services required, and to perform this Contract in a professional and timely manner; and
WHEREAS, the Town has relied upon the above representations by Contractor;
NOW, THEREFORE, for and in consideration of these promises, of the mutual covenants herein
set forth, and for other good and valuable consideration, the sufficiency of which is hereby acknowledged,
and the above-referenced recitals incorporated into this Contract herein by reference, the Parties hereto
hereby agree as follows:
SECTION 1. Contract Documents
The Parties agree that the term “Contract Documents” shall include the following, which are
attached hereto and incorporated herein by reference as if set out in full:
Exhibit A: Request for Proposals (RFP) No. 2026-01
Exhibit B: RFP No. 2026-01 – General Terms and Conditions
Exhibit C: RFP No. 2026-01 – Scope of Services
Exhibit D: RFP No. 2026-01 – Insurance Requirements
Exhibit E: Contractor’s Insurance certificate(s) and endorsement(s)
SECTION 2. Performance of Services
The Contractor agrees to perform and furnish all labor, supervision, materials, equipment,
23
RFP 2026-01 RFP Attachment C – Page 2 of 13
Town of Seabrook Island
transportation and supplies necessary for the completion of the Services required under this Contract in
a professional, timely manner, in accord with all applicable laws, rules and regulations.
The Contractor shall provide the Services as specified in the Notice to Proceed, but not before
said notice is issued. Coordination of the Services and administration of this Contract on behalf of the
Town shall be by the Town Administrator.
SECTION 3. Contract Price: Payment Terms
The Town agrees to pay ____________________dollars ($__________) (hereinafter “ Contract
Price”) to the Contractor for the Contractor’s performance of the Services described in this Contract, plus
all reasonable expenses, pre-approved in writing by the Town Administrator, necessary to accomplish and
complete the Services, in accordance with all terms and conditions as stated herein. The Contract Price
shall be paid in monthly installments, as follows:
[IF ALTERNATIVE #1 – PEAK SEASON SERVICE ONLY IS SELECTED]
Installment # Dates Covered (Installment Period) Payment Amount
1 April 1 – April 30 $__________
2 May 1 – May 31 $__________
3 June 1 – June 30 $__________
4 July 1 – July 31 $__________
5 August 1 – August 30 $__________
6 September 1 – September 30 $__________
TOTAL $__________
[IF ALTERNATIVE #2 – YEAR-ROUND SERVICE IS SELECTED]
Installment # Dates Covered (Installment Period) Payment Amount
1 April 1 – April 30 $__________
2 May 1 – May 31 $__________
3 June 1 – June 30 $__________
4 July 1 – July 31 $__________
5 August 1 – August 30 $__________
6 September 1 – September 30 $__________
7 October 1 – October 31 $__________
8 November 1 – November 30 $__________
9 December 1 – December 31 $__________
10 January 1 – January 31 $__________
11 February 1 – February 28 $__________
12 March 1 – March 31 $__________
TOTAL $__________
The Contractor shall invoice the Town for each Payment Amount within five (5) business days
following the closing date of each Installment Period. In no event shall the aggregate total of the invoices
for Services so submitted exceed the Contract Price.
24
RFP 2026-01 RFP Attachment C – Page 3 of 13
Town of Seabrook Island
SECTION 4. Term of Contract; Time and Dates of Performance
The initial term of the Contract shall be for a period of two years, beginning on April 1, 2026, and
ending on March 31, 2028 (“Initial Term”).
During the Initial Term, the Contractor shall perform the Services on the dates and times and with
the personnel and vehicles as follows:
[IF ALTERNATIVE #1 – PEAK SEASON SERVICE ONLY IS SELECTED]
Hours of Operation & Staffing Levels
Dates of Coverage* Shifts
Per Day Hours & Staffing
Early Season
April 1 through the Thursday preceding
Memorial Day
1
Daily Staffing
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 9:30 AM
- Off-Beach (End Time): 4:30 PM
- Total Coverage: 7 Hours
Mid-Season
Friday preceding Memorial Day through the
second Sunday in August
2
Shift #1 (AM)
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 8:30 AM
- Off-Beach (End Time): 3:30 PM
- Total Coverage: 7 Hours
Shift Overlap
- Vehicles: 2
- Personnel: 4 (2 Per Vehicle)
- Overlap (Start Time): 12:30 PM
- Overlap (End Time): 3:30 PM
- Total Overlap: 3 Hours
Shift #2 (PM)
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 12:30 PM
- Off-Beach (End Time): 7:30 PM
- Total Coverage: 7 Hours
Late Season
Monday following the second Sunday in
August through Labor Day September 30
1
Daily Staffing
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 9:30 AM
- Off-Beach (End Time): 4:30 PM
- Total Coverage: 7 Hours
[IF ALTERNATIVE #2 – YEAR-ROUND SERVICE IS SELECTED]
Hours of Operation & Staffing Levels
25
RFP 2026-01 RFP Attachment C – Page 4 of 13
Town of Seabrook Island
Dates of Coverage* Shifts
Per Day Hours & Staffing
Early Season
April 1 through the Thursday preceding
Memorial Day
1
Daily Staffing
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 9:30 AM
- Off-Beach (End Time): 4:30 PM
- Total Coverage: 7 Hours
Mid-Season
Friday preceding Memorial Day through the
second Sunday in August
2
Shift #1 (AM)
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 8:30 AM
- Off-Beach (End Time): 3:30 PM
- Total Coverage: 7 Hours
Shift Overlap
- Vehicles: 2
- Personnel: 4 (2 Per Vehicle)
- Overlap (Start Time): 12:30 PM
- Overlap (End Time): 3:30 PM
- Total Overlap: 3 Hours
Shift #2 (PM)
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 12:30 PM
- Off-Beach (End Time): 7:30 PM
- Total Coverage: 7 Hours
Late Season
Monday following the second Sunday in
August through Labor Day September 30
1
Daily Staffing
- Vehicles: 2
- Personnel: 2 (1 Per Vehicle)
- On-Beach (Start Time): 9:30 AM
- Off-Beach (End Time): 4:30 PM
- Total Coverage: 7 Hours
Off-Season
Tuesday following Labor Day through April 1
October 1 through March 31
1
Daily Staffing
- Vehicles: 1
- Personnel: 1
- On-Beach (Start Time): 9:30 AM
- Off-Beach (End Time): 4:30 PM
- Total Coverage: 7 Hours
Upon reasonable notice to the Contractor during the Initial Term (or any extension thereof) the
Town may request additional Services on dates other than those specified above. In such event, the
Contractor shall use reasonable efforts to accommodate the Town’s request at a cost approximately
proportional to the Contract Price. Any changes in the Contract Price, dates of coverage and hours of
coverage shall be agreed to in writing by both Parties and attached hereto as an addendum.
The Town reserves the right to renew this Contract for up to five (5) additional one-year periods
if it determines renewal to be in its best interest ; provided, in no event shall the total term of this
26
RFP 2026-01 RFP Attachment C – Page 5 of 13
Town of Seabrook Island
Contract, including both the Initial Term and annual renewals, exceed a total of seven (7) years.
After the Initial Term, any request by the Contractor for a price increase for subsequent renewal
periods must be made in writing at least ninety (90) days prior to the anniversary date of the Contract,
or sooner if so requested by the Town. Any request for a price increase will be evaluated by the Town
prior to exercising its right to renew. The Town will be the sole judge as to whether any price increase
will be approved. If the Town exercises its right of renewal, any changes to the dates of coverage, hours
of operation and Contract Price shall be agreed to in writing as an addendum to this Contract.
The Contractor expressly acknowledges that time is of the essence in completion of this Contract
and that the time limits and dates herein are critical components of the Contract. The Contractor
warrants and represents that it has taken these facts into c onsideration and has determined that it can
complete the Services within these time limits, including time for likely delays caused by weather or from
other sources. The Contractor will not be compensated for any delays beyond the time set forth herein.
The Contractor's only remedy for delays may be an extension of time to perform the Services. Due
consideration will be given to claims for an extension of time due to extraordinary circumstances only.
SECTION 5. Insurance Requirements
The Contractor, at its own expense, shall at all times during the term of the Contract, maintain
insurance which meets all of the requirements set forth in Exhibit D: Insurance Requirements, and as
included in Exhibit E : Insurance Certificate(s) and Endorsement(s) , which are attached hereto and
incorporated by reference. The Town may contact the Contractor’s insurer(s) or insurer(s)' agent(s)
directly at any time regarding the Contractor’s coverages, coverage amounts, or other such relevant and
reasonable issues related to this Contract. The Contractor shall also require any subcontractors to carry
the same coverages in the same amounts.
The Town must be advised immediately of any lapse changes in required coverages.
SECTION 6. Compliance with Legal Requirements
All applicable federal, state and local laws, ordinances, and rules and regulations of any authorities
(including, but not limited to, any laws, ordinances or regulations relating to the S.C. Department of
Revenue or the S.C. Board of Contractors) shall be binding upon the Contractor throughout the pendency
of the provision of Services. The Contractor shall be responsible for compliance with any such law,
ordinance, rule or regulation, and shall hold the Town harmless and indemnify same in the event of non-
compliance as set forth in the Contract.
By signing a bid, the Contractor certifies that it will comply with the applicable requirements of
Title 8, Chapter 14 of South Carolina Code of Laws, 1976, as amended, and agrees to provide to the State
upon request any documentation required to establish either: (a) that Title 8, Chapter 14 is inapplicable
to the Contractor and its subcontractors or sub -subcontractors; or (b) that the Contractor and its
subcontractors or sub-subcontractors are in compliance with Title 8, Chapter 14.
The Contractor agrees to include in any contracts with subcontractors, language requiring
subcontractors to (a) comply with applicable requirements of Title 8, Chapter 14, and (b) include in its
contracts with the subcontractors language requiring the sub -subcontractors to comply with the
applicable requirements of Title 8, Chapter 14.
27
RFP 2026-01 RFP Attachment C – Page 6 of 13
Town of Seabrook Island
The Contractor agrees to and shall certify agreement to abide by the requirements under Title VI
of the Civil Rights Act of 1964, and other non-discrimination authorities under federal law, and specifically
the provisions of the equal opportunity clause.
The Contractor shall comply with all federal, state and local laws, ordinances, rules and
regulations of any authorities throughout the duration of this Contract. The Contractor shall be
responsible for compliance with any such law, ordinance, rule or regulation, and shall hold Town harmless
and indemnify same in the event of non compliance.
SECTION 7. Contractor's Warranties and Representations
The Contractor represents that its staff is knowledgeable about and experienced in performing
the Services required in this Contract and warrants that it will use its best skill and attention to provide
the above-described Services in a professional, timely manner. The Contractor is fully qualified to act as
the general contractor for the required Services and has, and shall maintain, any and all licenses, permits
or other authorizations necessary to act as the general contractor for the provision of the Services. The
Contractor is familiar with the site(s) at which the Services are to be performed.
The Contractor warrants and represents that it shall be responsible for all subcontractors working
directly for it, as well as for their work product, as though Contractor had performed the Services itself.
The Town Administrator may, in writing, require the Contractor to remove from the work site any
employee or subcontractor the Town Administrator deems incompetent, careless or otherwise
objectionable.
If equipment, materials and supplies are to be included as part of the Services provided, all
equipment, materials and supplies so included and provided by the Contractor are to be of the most
suitable grade for the purposes intended. When requested, the Contractor shall furnish the Town for
approval the name of the manufacturer, the model number and other identifying data and information
respecting the performance, capacity and rating of the machinery and other mechanical equipment which
is incorporated in the Services provided. Machinery, equipment and materials installed and / or used
without the prior approval of the Town shall be at risk of rejection.
SECTION 8. Retention of Records
The Contractor agrees to maintain for three (3) years from the date of Final Payment, or until the
end of any audit or closure of all pending matters under this Contract, whichever is later, all books,
documents, papers, and records pertinent to this Contract. The Contractor agrees to provide to the Town,
any federal grantor agency, the Comptroller General of the United States, any state grantor agency, any
assignee, or any of their duly authorized representatives access to such books, documents, papers, an d
records for the purpose of examining, auditing, and copying them. The Contractor further agrees to
include these provisions in any subcontracts issued in connection with this Contract.
SECTION 9. State and Local Taxes
Except as otherwise specifically provided for in the Contract, the Contract Price shall include all
applicable state and local taxes.
28
RFP 2026-01 RFP Attachment C – Page 7 of 13
Town of Seabrook Island
The successful Bidder shall calculate that portion of the Contract which is subject to the South
Carolina sales and/or use tax, which amount shall be itemized and shown on all invoices, and shall be paid
to South Carolina Department of Revenue (SCDOR) by successful Bidder. If the successful Bidder is a non-
South Carolina company, the Town will withhold said amount from all invoices and remit payment to the
SCDOR, unless successful Bidder furnishes Town with a valid South Carolina Use Tax Registration
Certificate Number.
The Contractor shall indemnify and hold harmless the Town for any loss, cost, or expense incurred
by, levied upon or billed to the Town as a result of Contractor's failure to pay any tax of any type due in
connection with this Contract.
The Contractor shall ensure that the above sections are included in all subcontracts and sub -
subcontracts and shall ensure withholding on out of state sub and sub -subcontractors to which
withholding is applicable.
SECTION 10. Independent Contractor
The Contractor is an independent contractor and shall not be deemed the agent or employee of
the Town for any purpose whatsoever. The Contractor shall not hold himself out as an employee of the
Town and shall have no power or authority to bind or obligate the Town in any manner, except the Town
shall make payment to the Contractor for the Services provided and necessary expenses rela ted thereto
as herein provided. The Contractor shall obtain and maintain all licenses and permits required by law for
performance of this Contract by him or his employees, agents, and servants. The Contractor shall be liable
for and pay all taxes required by local, state or federal governments, including but not limited to social
security, Workers’ Compensation, employment security, and any other taxes and licenses or insurance
premiums required by law. No employee benefits of any kind shall be paid by the Town to or for the
benefit of the Contractor or its employees, agents, or servants by reason of this Contract.
The Contractor acknowledges and agrees that it has no independent decision -making authority
related to enforcement, discretionary matters, or any aspect of ordinance administration beyond the
scope of duties expressly set forth in this Agreement. The Contractor’s role is strictly administrative, and
any matter requiring interpretation, policy determination, or discretion shall be referred to the Town for
resolution. The Contractor shall not modify, alter, or exercise judgment regarding any aspect of the Town’s
ordinances, enforcement procedures, or policies.
SECTION 11. Other Contracts
The Town reserves the right to undertake or award other contracts for additional work or services
and may elect to complete portions of the Services included in this Contract using its own forces or
through other contracts, and the Contractor shall fully c ooperate with such other contractors, Town
employees and carefully fit its own work or services to such work or services as may be directed by the
Town. The Contractor shall not commit or permit any act by its employees or subcontractors which will
interfere with the performance of work or services by any other contractor or by Town employees.
SECTION 12. Permits and Licenses
The successful Bidder, and any subcontractor, shall, without additional expense to the Town, be
responsible for obtaining and maintaining all necessary licenses and permits required by the State of
29
RFP 2026-01 RFP Attachment C – Page 8 of 13
Town of Seabrook Island
South Carolina or the Town or any other authority having jurisdiction over the provided Services. Prior to
execution of a contract, the successful Bidder and subcontractor may be required to provide a copy of its
current applicable Contractor’s Licenses issued by the State of South Carolina and the Town.
SECTION 13. Safety, Health, and Security Precautions
The Contractor shall take proper safety, health and security precautions to protect its workers
and the Town's property, workers and the public at all times during the term of this Contract. All materials
shall be stored securely, protected from theft or damage.
SECTION 14. Conditions Affecting the Services
The Contractor shall be responsible for having taken steps reasonably necessary to ascertain the
nature and location where the Services will be provided, and the general and local conditions which can
affect the provision of Services or the cost thereof. Any failure by the Contractor to do so will not relieve
it from responsibility for successfully performing the Services without additional expense to the Town.
The Town assumes no responsibility for any understandings or representations concerning conditio ns
made by any of its officers or agents prior to the execution of this Contract, unless such understandings
or representations by the Town are expressly stated in this Contract.
SECTION 15. Repair of Damages
During the provision of Services, the Contractor will restore or replace, when and as directed by
the Town, any public or private property damaged or destroyed by the Contractor's work, equipment or
employees to a condition at least equal to that existing immediately prior to the beginning of the Services.
SECTION 16. Damages
The Contractor expressly agrees that if the required Services, or any part thereof, is not performed
or completed in a timely or professional manner in accordance with this Contract or any amendment
thereto, the Contractor shall be liable to the Town for all damages which relate to the Contractor’s failure
to perform or complete the Services in the manner described above. If the amount of damages are agreed
to by the Town and Contractor or awarded by a Court, the Town shall have the right to deduct from and
retain, out of monies which may be then due or which may become due and payable to the Contractor,
the amount of such damages; and if the amount so retained by the Town is not sufficient to pay in full
such damages, the Contractor and/or its sureties shal l pay to the Town the amount necessary to effect
payment in full of such damages.
SECTION 17. Suspension of Services
The Town Administrator may order, in writing, the Contractor to suspend, delay, or interrupt all
or any provision of Services for such period of time as he may determine to be appropriate for the
convenience of the Town. The Town may suspend performance of its obligations under this Contract in
good faith for the convenience of the Town or to investigate matters arising out of the performance of
Services.
The Town Administrator may order suspension of the Services in whole or in part for such time as
he deems necessary because of the failure of the Contractor to comply with any of the requirements of
30
RFP 2026-01 RFP Attachment C – Page 9 of 13
Town of Seabrook Island
this Contract, and the Contract's completion date shall not be extended on account of any such suspension
of the provided Services.
When the Town Administrator orders any suspension of the Services under the paragraph above,
the Contractor shall not be entitled to any payment for Services with respect to the period during which
such Services are suspended and shall not be entitled to any costs or damages resulting from such
suspension.
The rights and remedies of the Town provided in this Section are in addition to any other rights
and remedies provided by law or under this Contract.
SECTION 18. Modification of Contract
The Town maintains the right to modify this Contract when modification is determined to be in
the best interest of the Town ; provided however, the Contractor is given written notice of any such
modification and the Town is responsible for paying Contractor for any additional expenses reasonably
and necessarily incurred by Contractor which relate to the modification. Subject to the above, the
Contractor shall immediately notify the Town in writing of any proposed adjustment in its fee. The
Contractor is obligated to perform the revised contract when so directed by the Town Administrator and
the Town is obligated to pay for the Se rvices performed pursuant to the modification. No claim by the
Contractor for an adjustment hereunder shall be allowed if asserted after Final Payment under this
Contract.
SECTION 19. Termination
A. For Convenience
The Town Administrator, by advance written notice, may terminate this Contract when it
is in the best interests of the Town. If this Contract is so terminated, the Contractor shall
be compensated at the rate specified in the Contract for all necessary and reasonable
direct costs of performing the Services to the date of termination. The Contractor will not
be compensated for any other costs in connection with a termination for convenience.
The Contractor will not be entitled to recover any damages in connec tion with a
termination for convenience.
B. For Default
If the Contractor refuses or fails to perform the Services or any separable part thereof in
a timely or workmanlike manner in accordance with the Contract Documents, or
otherwise fails, in the sole opinion of the Town, to comply with any of the terms and
conditions of the Contract Documents deemed, in the sole opinion of the Town, to be
material (including, without limitation, the requirement that Contractor obtain and
maintain in force all necessary permits), such refusal or failure shall be deemed a default
under this Contract.
In the event of a default under this Section, the Town shall have the right to terminate
forthwith this Contract by written notice to the Contractor. In the event of such default,
advance notice for termination is waived and the Contractor shall not be ent itled to any
31
RFP 2026-01 RFP Attachment C – Page 10 of 13
Town of Seabrook Island
costs or damages resulting from a termination under this section.
Whether or not the Contractor's right to proceed with the Services is terminated, it and
its sureties shall be liable for any damage to the Town resulting from Contractor's default.
Any wrongful termination for default shall be deemed by the Parties a term ination for
convenience.
C. Termination for Non-Appropriation of Funds
The Town Administrator, by written advance notice, may terminate this Contract in whole
or in part in the event that sufficient appropriation of funds from any source (whether a
federal, state, Town or other source) are not made or sufficient funds are oth erwise
unavailable, in either case, to pay the charges under this Contract. If this Contract is so
terminated, the Contractor shall be compensated for all necessary and reasonable direct
costs of performing the Services actually provided to the date of suc h termination. The
Contractor will not be compensated for any other costs in connection with a termination
for non-appropriation or unavailability of funds. The Contractor will not be entitled to
recover any damages in connection with a termination for non -appropriation or
unavailability of funds, including, but not limited to, lost profits.
D. Rights Cumulative
The rights and remedies of the Town provided in this Section are in addition to any other
rights and remedies provided by law or under this Contract.
SECTION 20. Indemnification
Except for expenses or liabilities arising directly from the negligence or intentional acts of the
Town, the Contractor hereby expressly agrees to indemnify, defend and hold the Town harmless against
any and all expenses and liabilities arising out of the performance or default hereunder as follows:
The Contractor expressly agrees that to the extent that there is a causal relationship between (A)
its negligence, action or inaction, or the negligence, action or inaction of any of its employees or any
person, firm or corporation directly or indirectly employed by the Contractor and (B) any damage, liability,
injury, loss or expense (whether in connection with bodily injury or death or property damage) that is
suffered by the Town and/or its officers or employees or by any member of the public, it shall indemnify,
defend and save the Town and its officers and employees harmless from and against any and all liabilities,
penalties, demands, claims, lawsuits, losses, damages, costs, and expenses arising directly or indirectly
out of the performance of this Contract. Such costs are to include, without limitation, defense, settlement
and reasonable attorney’s fees incurred by the Town and its employees. This obligation to indemnify shall
include, without limitation, bodily injuries or death occurring to the Con tractor’s employees and any
person, directly or indirectly employed by the Contractor (including, without limitation, any employee of
any subcontractor), the Town’s officers or employees, the employees of any other independent
contractors, or occurring to any member of the public. When the Town submits notice, Contractor shall
promptly defend any aforementioned claim, demand or lawsuit. This obligation shall survive the
suspension or termination of this Contract. The limits of insurance required in this Contract shall not limit
the Contractor’s obligation of indemnification under this Section. The recovery of costs and fees all extend
to those incurred in the enforcement of this indemnity.
32
RFP 2026-01 RFP Attachment C – Page 11 of 13
Town of Seabrook Island
SECTION 21. Gratuities and Kickbacks
Gratuities. It shall be unethical for any person to offer, give or agree to give any employee or
former employee, or for any employee or former employee to solicit, demand, accept, or agree to accept
from another person a gratuity or an offer of employment in connecti on with any decision, approval,
disapproval, recommendation, preparation or any part of a program requirement or a purchase request,
influencing the content of any specification or procurement standard, rendering of advice, investigation,
auditing, or in any other advisory capacity in any proceeding or application, request for ruling,
determination, claim or controversy, or other particular matter pertaining to any program requirement
of a contract or subcontract, or to any solicitation or proposal therefore.
Kickbacks. It shall be unethical for any payment, gratuity, or offer of employment to be made by
or on behalf of a subcontractor under a contract to the prime contractor, or to hire any subcontractor or
any person associated therewith, as an inducement for the award of a subcontract or order.
Violation of this clause may result in Contract termination.
SECTION 22. Labor: Subcontractors
If any subcontractors will be used for this project, the Contractor shall provide to the Town
Administrator a list of names of any of the intended subcontractors, the subcontractor's applicable license
number(s), and a description of the work to be done by each subcontractor. The Contractor shall not
substitute other subcontractors without the written consent of the Town Administrator. The Contractor
shall be responsible for all services performed by a subcontractor as though they had been performed by
the Contractor. Responsibilities include, but are not limited to, compliance with any applicable licensing
regulations. If at any time the Town Administrator determines that any subcontractor is incompetent or
undesirable, he or she shall notify the Contractor accordingly , and the Contractor shall take immediate
steps for cancellation of the subcontract and replacement. Nothing herein shall create any contractual
relationship between any subcontractor and the Town.
It shall be the Contractor’s responsibility to ensure that all terms required in the attached Contract
are incorporated into all subcontracts
SECTION 23. Confidentiality and Use of Name
Contractor agrees that it will not release any information relating to this Contract including
without limitation press releases, advertisements, or marketing materials without the prior written
consent of the Town.
SECTION 24. Force Majeure
The Town will not be liable for contract default or delay due to acts beyond its reasonable control.
Contractor shall inform the Town in writing whenever it becomes aware of facts or circumstances which
may delay or prevent its performance.
SECTION 25. Assignment
33
RFP 2026-01 RFP Attachment C – Page 12 of 13
Town of Seabrook Island
The Contractor shall not assign in whole or in part the Contract without the prior written consent
of the Town. The Contractor shall not assign any money due or that may become due to it under said
Contract without the prior written consent of the Town. Each Party binds itself, its successors, assigns,
executors, administrators or other representatives to the other Party hereto and to successors, assigns,
executors, administrators or other representatives of such other Party in connection with all terms a nd
conditions of the Contract.
SECTION 26. Controlling Law
This Contract shall be governed by the laws of the State of South Carolina.
SECTION 27. Incorporation by Reference
The Request for Proposals applicable to the Services, together with all addenda, attachments and
exhibits thereto, are hereby incorporated by reference into this Contract as if set out in full.
SECTION 28. Entire Contract
This Contract constitutes the entire understanding and agreement between the Parties hereto
and supersedes all prior and contemporaneous written and oral contracts between the Parties and their
predecessors in interest regarding the subject matter of this Contract. This Contract may not be changed,
altered, amended, modified, or terminated orally, except as specifically provided, and any such change,
alteration, amendment, or modification must be in writing and executed by the Parties hereto.
SECTION 29. Severance
Should any part of this Contract be determined by a Court of competent jurisdiction to be invalid,
illegal, or against public policy, said offending Section shall be void and of no effect and shall not render
any other Section herein, nor this Contract as a whole, invalid. Any terms which, by their nature, should
survive the suspension, termination or expiration hereof shall be deemed to so survive.
SECTION 30. Non-waiver
Any waiver of any default by either Party to this Contract shall not constitute waiver of any
subsequent default, nor shall it operate to require either Party to waive, or entitle either Party to a waiver
of, any subsequent default hereunder.
SECTION 31. Set-Off
The Town shall at all time have the right to set-off any amounts owing from the Contractor to the
Town against any amount owing from the Town to the Contractor. At the Town’s option, repayment in
lieu of set-off may be required.
IN WITNESS WHEREOF, the Parties hereto have executed this Contract under their several seals
the day and year first written above.
Contractor Town of Seabrook Island
By: ______________________________ By: ______________________________
34
RFP 2026-01 RFP Attachment C – Page 13 of 13
Town of Seabrook Island
Its: ______________________________ Its: ______________________________
Attest: ______________________________ Attest: ______________________________
35
RFP 2026-01 RFP Attachment C – Page 14 of 13
Town of Seabrook Island
Exhibits to Beach Patrol Services Contract
[INSERT] Exhibit A: Request for Proposals (RFP) No. 2026-01
[INSERT] Exhibit B: RFP No. 2026-01 – General Terms and Conditions
[INSERT] Exhibit C: RFP No. 2026-01 – Scope of Services
[INSERT] Exhibit D: RFP No. 2026-01 – Insurance Requirements
[INSERT] Exhibit E: Contractor’s Insurance certificate(s) and endorsement(s)
36
RFP 2026-01 RFP Attachment D – Page 1 of 1
Town of Seabrook Island
ATTACHMENT D
INSURANCE REQUIREMENTS
(Contracts Greater Than $10,000)
The successful Bidder will be required, at its own expense, to procure and maintain for the duration of
their contract with the Town insurance against claims for injuries to persons or damages to property which
may arise from or i n connection with Services provided by the Contractor, its agents, representatives,
employees or subcontractors.
1. The successful Bidder shall carry and maintain Workman’s Compensation Insurance in statutory
amounts for its employees.
2. The successful Bidder shall carry and maintain a comprehensive general liability policy of at least
one million dollars ($1,000,000.00) per occurrence (combined single limit of liability) to cover
operations, equipment and contractual liability. The policy shall name the Town of Seabrook
Island as an additional named insured.
3. The successful Bidder shall maintain automobile insurance liability policies on all vehicles used in
the performance of the Services with at least five hundred thousand / one million dollars
($500,000.00 / $1,000,000.00) coverage.
4. Any deductibles or self-insured retentions larger than $5,000 must be declared to and approved
by the Town.
5. Each Insurance policy required by the Town shall be endorsed to state that should any of the
required policies be cancelled before the expiration date thereof, notice will be delivered to the
Town prior to the date of such cancellation.
6. All coverages for subcontractors shall be subject to all the requirements stated herein.
7. Insurance must be placed with an approved insurance company with current Best's rating of A+,
A, or A - and minimum Financial Size Category (FSC) of VIII or greater. Exceptions to this
requirement must be approved in writing by the Town Administrator.
8. The Contractor shall furnish the Town with Certificates of Insurance noting the endorsements.
The Certificates and endorsements for each insurance policy are to be signed by a person
authorized by that insurer to bind coverage on its behalf. All certificates and endorsements are to
be received and approved by the Town before work commences. The Town reserves the right to
require complete, certified copies of all required insurance policies, at any time.
Required certificates should be mailed to: Town Administrator
Town of Seabrook Island
2001 Seabrook Island Road
Seabrook Island, SC 29455
The Certificates shall be attached to the Contract as Exhibit E
37
RFP 2026-01 RFP Attachment E – Page 1 of 1
Town of Seabrook Island
ATTACHMENT E
Non-Collusion Oath
CITY/TOWN OF: _________________________________
STATE OF: _________________________________
Before me, the Undersigned, a Notary Public, for and in the Town and State aforesaid, personally
appeared __________________________________ and made oath that the Bidder herein, its agents,
servants, and/or employees, to the best of its knowledge and belief, have not in any way colluded with
anyone for and on behalf of the Bidder, or itself, to obtain information that would give the Bidder an
unfair advantage over others, nor have it colluded with anyone for and on behalf of the Bidder, or itself,
to gain any favoritism in the award of the Contract herein.
SWORN TO BEFORE ME THIS
_____ DAY OF __________________, 20___
NOTARY PUBLIC FOR THE STATE OF
_____________________________________
My Commission Expires: _________________
Print Name: ___________________________
Address: ______________________________
_____________________________________
Phone Number: ________________________
_________________________________________
Authorized Signature for Bidder
_________________________________________
Print Bidder’s Name
Bidder’s Address:
_________________________________________
_________________________________________
NOTARY SEAL (Required for Out of State Bidders)
38
Discretionary Grants Program: Program Guidelines Page 1 of 6
DISCRETIONARY GRANTS PROGRAM
PROGRAM GUIDELINES
Adopted February 24, 2026 [Anticipated]
Note: Additions Deletions
PURPOSE
The Discretionary Grants Program is intended to support eligible organizations in carrying out
Projects that advance a legitimate public purpose and provide a direct and demonstrable benefit
to the Town of Seabrook Island (the “Town”), including, but not limited to, its residents, property
owners, visitors, and/or businesses. Grant funds shall be used to promote community wellness,
civic engagement, cultural and historical awareness, economic vitality, environmental stewardship,
and wildlife conservation in a manner consistent with applicable law, Town policy, and sound fiscal
accountability.
As used herein, the term “Project” means any program, project, activity, initiative, or undertaking
for which funding from the Discretionary Grants Program is requested or awarded.
APPLICANT ELIGIBILITY
Discretionary Grants may be awarded by the Town to organizations that:
• Are recognized as tax-exempt under Section 501(c) of the Internal Revenue Code;,
including:
•
• Section 501(c)(3) – Charitable, religious, educational, and scientific organizations;
• Section 501(c)(4) – Social welfare organizations;
• Section 501(c)(6) – Business leagues and chambers of commerce;
• Section 501(c)(7) – Social and recreational clubs;
• Section 501(c)(8) and (10) – Fraternal beneficiary societies; and
• Section 501(c)(19) – Veterans’ organizations;
• Are established for benevolent, social welfare, scientific, educational, environmental,
philanthropic, humane, patriotic, public health, civic, or other eleemosynary purposes, or
for the benefit of public safety personnel;
• Employ a charitable purpose or appeal as the basis for solicitation; or
• Are units of local government created or authorized by the State of South Carolina,
including counties, municipalities, school districts, and special purpose districts.
Religious organizations MAY be eligible for grant funding, provided the proposed Project serves a
secular (non-religious) public purpose.
39
Discretionary Grants Program: Program Guidelines Page 2 of 6
Individuals and organizations affiliated with a national, state, or local political party or candidate
are NOT eligible for grant funding.
Eligible organizations must allow open membership to all interested persons.
Pursuant to the South Carolina Solicitation of Charitable Funds Act (S.C. Code Ann. Title 33,
Chapter 56), charitable organizations that solicit contributions or have contributions
solicited on their behalf must register annually with the South Carolina Secretary of State
unless exempt. Applicants must provide documentation of their current registration or
exemption status with their grant application. This requirement shall not apply when the
applicant is a unit of local government.
PROJECT ELIGIBILITY
Discretionary Grants may be awarded to eligible organizations to support any lawful Project that:
• Promotes community wellness, cultural or historical awareness, or economic development;
• Enhances citizen participation, satisfaction, or sense of place;
• Preserves or protects wildlife and wildlife habitat;
• Supports environmental or wildlife conservation efforts; or
• Increases public knowledge of environmental, wildlife, or community issues affecting the
Town.
Preference shall be given to Projects occurring within the Town’s corporate limits. Projects outside
the Town limits may be considered if they provide a clear and demonstrable benefit to the Town
or its residents, visitors, and/or businesses.
All grant funds must advance a legitimate public purpose.
Unless expressly authorized by Town Council, grant funds shall NOT be used for:
• Cash, gift cards, and other items of monetary valuePrizes, awards, trophies, gift
cards, raffles, or giveaways, including cash or items of monetary value distributed to
participants or attendees, provided, non-cash awards, trophies, and other giveaways of
nominal value may be permitted;
• Sub-grants or pass-through funding, including redistribution of grant funds to other
organizations, individuals, or entities not directly approved by the Town;
• Activities that violate federal, state, or local laws, regulations, ordinances, or other
Town policies;
• Political activities, including support of political parties, candidates, campaigns, or ballot
initiatives;
40
Discretionary Grants Program: Program Guidelines Page 3 of 6
• Religious instruction, worship services, or proselytizing, provided, however, faith-
based organizations may receive funding for Projects serving a secular public purpose;
• Operating deficits or debt repayment, including payment of past-due bills, loans, or
financial obligations;
• Fundraising activities or events, including costs associated with soliciting donations or
hosting fundraising campaigns;
• Alcoholic beverages, except as expressly approved as part of a permitted community
event in compliance with applicable law;
• Personal expenses, including stipends, honoraria, or compensation not directly related to
the approved Project or not supported by appropriate documentation;
• Capital improvements or property acquisition, including land purchases or permanent
structural improvements;
• Travel expenses not directly related to Project implementation within, or providing a
direct benefit to, the Town;
• Expenses incurred prior to grant approval;
• Administrative overhead not reasonably allocable to the approved Project, including
general office expenses unrelated to the Project; or
• Any other use inconsistent with the approved grant application or the terms and
conditions of the award.
Town Council reserves the right to amend or limit eligibility criteria at any time.
GRANT AWARDS
Grant awards shall range from $250.00 (minimum) to The maximum grant award shall be
$5,000.00 (maximum) per organization per calendar year.
The total funding available each calendar year shall not exceed the amount appropriated by Town
Council in the annual budget ordinance. The Town is not obligated to award all available funds.
Organizations may submit multiple applications; however, the total amount awarded to any
organization shall not exceed $5,000.00 in a calendar year.
APPLICATION
Applications must be submitted to the Town Finance Director during the calendar year in which
funds are proposed to be expended. Unless otherwise authorized, applicants shall use the
standard application form prescribed by the Town Administrator.
41
Discretionary Grants Program: Program Guidelines Page 4 of 6
Application acceptance periods, review schedules, and submission deadlines shall be established
annually by the Town Administrator and publicly announced by the Town. Applications shall be
accepted until the earlier of October 1st or until all available funds for the calendar year have
been committed.
Completed applications shall be submitted to: Town of Seabrook Island
Attn: Finance Director
2001 Seabrook Island Road
Seabrook Island, SC 29455
REVIEW PROCEDURES
The Town Finance Director shall review all grant applications for completeness. Complete
applications shall be placed on the agenda for the next meeting of the Town’s Discretionary
Grants Committee (the “Committee”).
The Committee shall review each application and provide a recommendation to Town Council. In
performing these functions, the Committee shall have the authority to:
• Establish procedures for reviewing applications;
• Request additional information from applicants; and
• Recommend modifications necessary to ensure applications conform to grant criteria.
The Committee shall provide a recommendation to approve (in whole or in part) or deny each
request.
Once the Committee has provided a recommendation, the application shall be placed on the
agenda for the next Town Council meeting, at which time Town Council shall review the request
and render a final decision. Town Council retains final authority to approve or deny all grant
applications.
A representative of the applicant must attend both the Committee meeting and Town
Council meeting (either in person or virtually) at which the application will be considered.
Failure to attend may result in deferral or denial.
EVALUATION CRITERIA
In reviewing grant applications, the Committee and Town Council shall consider the following
criteria:
• Public Benefit: The extent to which the Project provides a direct and demonstrable benefit
to the Town, its residents, visitors, and/or businesses.
•
• Alignment with Program Purpose: The degree to which the proposal advances one or
more of the program’s stated purposes, including community wellness, cultural and
historical awareness, economic development, citizen engagement, environmental
stewardship, and wildlife conservation.
•
42
Discretionary Grants Program: Program Guidelines Page 5 of 6
• Organizational Capacity: The applicant’s demonstrated ability to successfully implement
the Project, including relevant experience, staffing, partnerships, and financial stability.
•
• Project Feasibility and Work Plan: The clarity, completeness, and reasonableness of the
proposed scope of work, timeline, activities, and methods for achieving stated objectives.
•
• Budget and Cost Effectiveness: The reasonableness of the proposed budget and the
extent to which grant funds will be used efficiently, including leveraging other funding
sources or in-kind contributions when applicable.
•
• Measurable Outcomes: The extent to which the application identifies clear goals,
performance measures, or outcomes that can be used to evaluate Project success.
•
• Community Impact and Engagement: The anticipated level of participation, collaboration,
or engagement with the Seabrook Island community.
•
• Project Sustainability/Long-Term Impact: The potential for the Project to achieve long-term
impact or continue beyond the grant period.; and
•
• Compliance and Accountability: The applicant’s history of compliance with prior Town
grant requirements, if applicable, including timely reporting and proper use of funds.
GRANT AGREEMENT
Upon approval of a grant award by Town Council, each recipient must execute a written grant
agreement with the Town prior to the disbursement of any grant funds.
The grant agreement shall set forth the terms and conditions governing the use of grant funds
and shall include, at a minimum, the following:
• Grant Award Amount: The total amount of funds awarded to the recipient organization.
• Project Description and Scope of Work: A summary of the approved Project, including
key objectives, deliverables, and timelines.
• Authorized Use of Funds: The specific costs and budget categories for which grant funds
may be expended, consistent with the approved application and applicable Town policies.
• Disbursement Procedures: The process for requesting disbursement of grant funds,
including required documentation and applicable deadlines.
• Reporting Requirements: Required financial documentation, performance measures, and
final reporting obligations.
• Compliance Requirements: An obligation to comply with all applicable federal, state, and
local laws, Town ordinances, and program guidelines.
• Audit and Recordkeeping Provisions: Requirements for maintaining financial records
and making such records available to the Town for review or audit upon request.
43
Discretionary Grants Program: Program Guidelines Page 6 of 6
• Indemnification and Liability Provisions: Terms addressing responsibility for claims,
damages, or losses arising from the Project.
• Termination and Repayment Provisions: Conditions under which the Town may suspend
or terminate the agreement and require repayment of grant funds, including misuse of
funds or failure to comply with agreement terms.
• General Terms and Conditions: Standard contractual provisions as determined by the
Town, which may include insurance requirements, non-discrimination provisions,
assignment restrictions, and governing law.
No grant funds shall be disbursed by the Town unless the grant agreement has been fully
executed by the Mayor and the authorized representative(s) of the recipient.
Failure to execute a grant agreement within 30 days of the award date shall result in forfeiture of
the grant funds, unless an extension is approved by vote of Town Council.
DELIVERY OF GRANT FUNDS
Grant recipients shall submit a written request for disbursement to the Town Finance Director.
Disbursement requests shall be accompanied by all required documentation, including invoices
and/or paid receipts demonstrating the commitment or expenditure of awarded grant funds.
Disbursement requests must be received no later than December 15th of the calendar year in
which the grant funds were awarded. Failure to submit a disbursement request by this date may
result in forfeiture of any unpaid grant funds.
All disbursement requests shall be reviewed and approved by the Town Administrator prior to
payment. Upon approval, the Town Finance Director shall issue payment to the grant recipient.
Any grant funds that remain uncommitted or unexpended at the end of the calendar year shall
revert to the Town’s General Fund.
REPORTING REQUIREMENTS
Grant recipients shall submit a detailed written report describing the purpose(s) for which Town
funds were expended and the overall impact of the Project.
The report shall be submitted to the Town Administrator on or before December 31st of the
applicable calendar year, on a form provided by the Town Administrator.
At a minimum, the report shall include:
• A brief summary of the Project;
• A detailed accounting of the expenditure of Town funds; and
• A description of the outcomes achieved and the public benefits provided.
44
Discretionary Grants Program: Program Guidelines Page 7 of 6
Failure to submit the required report in a timely manner may result in enforcement actions,
including, but not limited to, the withholding of future funding, the requirement to repay funds, or
disqualification from future Town grant programs.The Town Administrator shall distribute copies of
all reports to members of the Committee and Town Council as soon as practicable after the
conclusion of the calendar year.
45
TOWN OF SEABROOK ISLAND
ORDINANCE NO. 2026-01
ADOPTED ______________
AN ORDINANCE AMENDING THE TOWN OF SEABROOK ISLAND DEVELOPMENT STANDARDS ORDINANCE
(“DSO”) TO ESTABLISH A PLANNED DEVELOPMENT (PD) DISTRICT AND TO UPDATE VARIOUS
DEVELOPMENT REGULATIONS, ADMINISTRATIVE PROCEDURES, AND DEFINITIONS
WHEREAS, the Development Standards Ordinance for the Town of Seabrook Island (the “DSO”)
was adopted by the Mayor and Council of the Town of Seabrook Island on June 29, 2022, with the passage
of Ordinance No. 2022-04; and
WHEREAS, the DSO was amended by the Mayor and Council on October 25, 2022, with the
passage of Ordinance No. 2022-06; and
WHEREAS, the DSO was again amended by the Mayor and Council on June 26, 2024, with the
passage of Ordinance No. 2024-03; and
WHEREAS, the DSO was most recently amended by the Mayor and Council on December 17, 2024,
with the passage of Ordinance No. 2024-06; and
WHEREAS, the Mayor and Council for the Town of Seabrook Island desire to further amend the
DSO to:
- Update references to various local, state, and federal agencies (Throughout);
- Update requirements for fences, walls, and swimming pools (Article 2);
- Update procedures for the establishment of zoning on annexed property (Article 3);
- Establish a Planned Development (PD) District (Article 7);
- Update conditional use requirements for short -term rental units related to the duties of
authorized agents and qualified local contacts, and to amend the items to be included in the
annual rental activity report (Article 9);
- Update landscaping and buffering requirements for certain zoning districts (Article 11);
- Update requirements for temporary signage (Article 13);
- Clarify procedures for the issuance of certificates of occupancy and establish a procedure for the
issuance of temporary certificates of occupancy (Article 18);
- Update policies and procedures for text and map amendments (Article 19);
- Update policies and procedures for appeals (Article 20);
- Amend policies for certain nonconforming buildings and structures (Article 21);
- Clarify requirements for enforcement actions and corresponding penalties (Article 22); and
- Update various definitions (Appendix A – Definitions)
WHEREAS, as required by law, the Town of Seabrook Island Planning Commission reviewed the
proposed amendments during a regularly scheduled meeting on February 11, 2026, at which time
members of the Planning Commission recommended in favor of approval of the proposed amendments,
with modifications; and
46
WHEREAS, as required by law, the Mayor and Council advertised and held a public hearing on the
proposed amendments during a duly called meeting on March 24, 2026, with public comments duly
noted; and
WHEREAS, the Mayor and Council believe it is fitting and proper to amend the DSO to achieve the
objectives stated herein;
NOW, THEREFORE, pursuant to the authority granted by the Constitution and the General
Assembly of the State of South Carolina, BE IT ORDAINED BY THE MAYOR AND COUNCIL FOR THE TOWN
OF SEABROOK ISLAND, S.C.:
SECTION 1. Adopting Amendments to the DSO. The amended version of the DSO, a copy of which
is attached hereto as “Exhibit A”, is hereby adopted by reference as if fully set forth in this section.
SECTION 2. Conflicting Ordinances Repealed . All ordinances or parts of ordinances in
conflict with the provisions of this ordinance are hereby repealed.
SECTION 3. Severability. If any section, subsection, paragraph, clause, or provision of this
ordinance shall be deemed to be unconstitutional, unenforceable, or otherwise invalid by the final
decision of a court of competent jurisdiction, it shall be construed to have been the legislative
intent of Town Council to pass said ordinance without such unconstitutional provision, and the
validity of all remaining sections, subsections, paragraphs, clauses, or provisions of said ordinance
shall not be affected thereby. If said ordinance, or any provision thereof, is held by the final decision
of a court of competent jurisdiction to be inapplicable to any person, group of persons, property,
kind of property, circumstances or set of circumstances, such holding shall not affect the
applicability thereof to any other persons, property or circumstances.
SECTION 4. Effective Date . This ordinance shall be effective from and after the date of
adoption.
SIGNED AND SEALED this _____ day of ___________________, 202 6, having been duly
adopted by the Mayor and Council for the Town of Seabrook Island on the _____ day of
___________________, 2026.
First Reading: February 24, 2026 TOWN OF SEABROOK ISLAND
Public Hearing: March 24, 2026
Second Reading: March 24, 2026 _______________________________
Bruce Kleinman, Mayor
LEGAL REVIEW ATTEST
_______________________________ _______________________________
Stafford J. McQuillin, Town Attorney Peter D. Wiggins II, Town Clerk
47
EXHIBIT A
To Ordinance No. 2026-01
Town of Seabrook Island
Development Standards Ordinance
(Amended)
48
Town of Seabrook Island
Development Standards Ordinance
[Title Page]
Adopted: June 29, 2022
Current Through: TBD
ORDINANCE
STANDARDS
DEVELOPMENT
49
Town of Seabrook Island Development Standards Ordinance 2
Town of Seabrook Island
Development Standards
Ordinance
TABLE OF CONTENTS
Article 1: Purpose, Organization and Enactment ............................................................................... 712
Section 1.1 Title and Purpose ................................................................................................. 813
Section 1.2 Enabling Authority ............................................................................................... 813
Section 1.3 Scope and Interpretation..................................................................................... 813
Section 1.4 Conflicting Regulations........................................................................................ 914
Section 1.5 Effect of this Ordinance ....................................................................................... 914
Section 1.6 Vested Rights ........................................................................................................ 914
Section 1.7 Rules of Construction ......................................................................................... 1015
Section 1.8 Repeal of Ordinances ........................................................................................ 1116
Section 1.9 Severability .......................................................................................................... 1217
Section 1.10 Enactment and Effective Date ............................................................................ 1217
Article 2: General Provisions ............................................................................................................... 1318
Section 2.1 General Compliance .......................................................................................... 1419
Section 2.2 BUILDINGs .......................................................................................................... 1722
Section 2.3 LOTs ..................................................................................................................... 1823
Section 2.4 SETBACKs ........................................................................................................... 1924
Section 2.5 STRUCTUREs ....................................................................................................... 2126
Section 2.6 USEs ..................................................................................................................... 2631
Section 2.7 Utilities and Services .......................................................................................... 2833
Article 3: Zoning Districts and Map.................................................................................................... 3035
Section 3.1 Districts Established ........................................................................................... 3136
Section 3.2 ZONING MAP...................................................................................................... 3136
Section 3.3 District Boundaries Interpreted ........................................................................ 3136
Section 3.4 LOTs Divided by a Zoning Line......................................................................... 3237
Section 3.5 Zoning of Vacated Areas ................................................................................... 3237
Section 3.6 Zoning of Annexed Property ............................................................................. 3237
Article 4: Conservation/Recreation Districts ..................................................................................... 3338
Section 4.1 Purpose ............................................................................................................... 3439
50
Town of Seabrook Island Development Standards Ordinance 3
Section 4.2 Schedule of Uses ................................................................................................ 3439
Section 4.3 Spatial Requirements ......................................................................................... 3641
Section 4.4 Site Development Regulations ......................................................................... 3742
Article 5: Residential Districts ............................................................................................................. 3843
Section 5.1 Purpose ............................................................................................................... 3944
Section 5.2 Schedule of Uses ................................................................................................ 3944
Section 5.3 Spatial Requirements ......................................................................................... 4045
Section 5.4 CONSERVATION SUBDIVISIONS ..................................................................... 4449
Section 5.5 Site Development Regulations ......................................................................... 4752
Article 6: Support Districts .................................................................................................................. 4853
Section 6.1 Purpose ............................................................................................................... 4954
Section 6.2 Schedule of Uses ................................................................................................ 4954
Section 6.3 Spatial Requirements ......................................................................................... 5055
Section 6.4 Site Development Regulations ......................................................................... 5156
Article 7: Mixed Use Districts .............................................................................................................. 5358
Section 7.1 Mixed Use (MU) District ..................................................................................... 5459
Section 7.2 Planned Development (PD) District.................................................................. 6671
Article 8: Overlay Districts ................................................................................................................... 8489
Section 8.1 Seabrook Island Road Overlay District ............................................................ 8590
Section 8.2 SHORT-TERM RENTAL Overlay District ........................................................... 9398
Article 9: Conditional Use Requirements ........................................................................................ 96101
Section 9.1 Scope ................................................................................................................. 97102
Section 9.2 Application and Review ................................................................................... 97102
Section 9.3 General Requirements ..................................................................................... 97102
Section 9.4 Specific Use Requirements .............................................................................. 98103
Article 10: Environmental Performance Standards ...................................................................... 142147
Section 10.1 Purpose ............................................................................................................ 143148
Section 10.2 Vegetation. ....................................................................................................... 143148
Section 10.3 Coastal Tidelands and WETLANDs. .............................................................. 143148
Section 10.4 Oceanfront and North Edisto River SETBACKs. ........................................... 143148
Section 10.5 Requirements for CRITICAL AREAS and WATERBODIES. .......................... 144149
Section 10.6 Dunes. ............................................................................................................... 145150
Section 10.7 Permits. ............................................................................................................. 145150
Article 11: Landscaping and Buffering .......................................................................................... 147152
51
Town of Seabrook Island Development Standards Ordinance 4
Section 11.1 Purpose ............................................................................................................ 148153
Section 11.2 General Provisions .......................................................................................... 148153
Section 11.3 Specific Landscaping Requirements ............................................................. 148153
Section 11.4 Materials, Installation, and MAINTENANCE ................................................. 155160
Section 11.5 Tree Preservation ............................................................................................ 157162
Article 12: Parking and Loading ..................................................................................................... 161166
Section 12.1 Purpose ............................................................................................................ 162167
Section 12.2 General Requirements .................................................................................... 162167
Section 12.3 Required Off-Street Parking ........................................................................... 164169
Section 12.4 Design Requirements ..................................................................................... 166171
Section 12.5 Off-Street LOADING Requirements .............................................................. 169174
Article 13: Signs ............................................................................................................................... 171176
Section 13.1 Purpose, Findings, and Intent ........................................................................ 172177
Section 13.2 General Provisions .......................................................................................... 173178
Section 13.3 Permitted Permanent SIGNs by District ........................................................ 179184
Section 13.4 Community SIGNs ........................................................................................... 182187
Section 13.5 TEMPORARY SIGNs ........................................................................................ 183188
Section 13.6 SIGN Permits .................................................................................................... 185190
Section 13.7 NONCONFORMING SIGNs ........................................................................... 187193
Section 13.8 Inspection and MAINTENANCE .................................................................... 187193
Section 13.9 Enforcement..................................................................................................... 187193
Article 14: Site Development Plan ................................................................................................. 189195
Section 14.1 Purpose ............................................................................................................ 190196
Section 14.2 Applicability ..................................................................................................... 190196
Section 14.3 Exemptions ...................................................................................................... 191197
Section 14.4 Application and Review .................................................................................. 191197
Section 14.5 Site Plan Requirements ................................................................................... 194200
Section 14.6 Review Criteria ................................................................................................. 196202
Section 14.7 Conditions ........................................................................................................ 197203
Section 14.8 Changes to an Approved Plan ....................................................................... 198204
Section 14.9 Time Limits ....................................................................................................... 198204
Section 14.10 Appeals ............................................................................................................ 199205
Article 15: Subdivision: Purpose and Procedures ........................................................................ 200206
Section 15.1 Scope and Purpose ......................................................................................... 201207
52
Town of Seabrook Island Development Standards Ordinance 5
Section 15.2 SUBDIVISION Type and Approval Authority ................................................ 201207
Section 15.3 Procedures and Plan Requirements .............................................................. 203209
Article 16: Subdivision: Design Requirements ............................................................................. 210216
Section 16.1 Purpose ............................................................................................................ 211217
Section 16.2 Design Standards ............................................................................................ 211217
Section 16.3 Required IMPROVEMENTs. ............................................................................ 215221
Section 16.4 Modifications ................................................................................................... 217223
Section 16.5 Appeals ............................................................................................................ 218224
Section 16.6 Street Naming Policy ....................................................................................... 218224
Article 17: Duties and Responsibilities .......................................................................................... 223229
Section 17.1 ZONING ADMINISTRATOR ............................................................................ 224230
Section 17.2 PLANNING COMMISSION ............................................................................. 224230
Section 17.3 TOWN COUNCIL ............................................................................................. 226232
Section 17.4 Board of Zoning Appeals ............................................................................... 227233
Article 18: Permits and Fees ........................................................................................................... 229235
Section 18.1 Minimum Requirements ................................................................................. 230236
Section 18.2 Required Permits ............................................................................................. 230236
Section 18.3 Fees ................................................................................................................... 234240
Section 18.4 PERFORMANCE GUARANTEEs ..................................................................... 234240
Article 19: Amendments ................................................................................................................. 237243
Section 19.1 Ordinance Text or Map Amendments .......................................................... 238244
Section 19.2 Amendment Procedure .................................................................................. 238244
Section 19.3 Criteria for Amendments ................................................................................ 242248
Section 19.4 Challenges ....................................................................................................... 244250
Article 20: Appeals .......................................................................................................................... 246252
Section 20.1 Purpose and Authority .................................................................................... 247253
Section 20.2 Administrative Appeals .................................................................................. 247253
Section 20.3 VARIANCEs ...................................................................................................... 249255
Section 20.4 Special Exceptions .......................................................................................... 251257
Section 20.5 Decisions of the Board .................................................................................... 251257
Section 20.6 Appeals of Board Decisions ........................................................................... 251257
Article 21: Nonconformities ............................................................................................................ 252258
Section 21.1 Intent ................................................................................................................. 253259
Section 21.2 NONCONFORMING Uses .............................................................................. 253259
53
Town of Seabrook Island Development Standards Ordinance 6
Section 21.3 NONCONFORMING BUILDINGs and STRUCTUREs ................................... 254260
Section 21.4 NONCONFORMING LOTs of Record ........................................................... 255261
Section 21.5 Non-Reversion ................................................................................................. 255261
Section 21.6 Unlawful Nonconformities .............................................................................. 255261
Article 22: Enforcement and Penalties .......................................................................................... 256262
Section 22.1 Minimum Requirements ................................................................................. 257263
Section 22.2 Enforcement..................................................................................................... 257263
Section 22.3 Violations .......................................................................................................... 258264
Section 22.4 Penalties ........................................................................................................... 259265
Section 22.5 Appeals ............................................................................................................ 260266
Appendix A: Definitions .................................................................................................................. 261267
Appendix B: Consolidated Table of Uses ..................................................................................... 280286
Appendix C: Consolidated Table of Spatial Requirements ........................................................ 284290
Appendix D: Plant Materials ........................................................................................................... 287293
Section D.1 Appropriate for PARKING LOTs and BUFFERs ........................................... 288294
Section D.2 Appropriate Native and Naturalized Species.............................................. 290296
Section D.3 Prohibited Plant Material ............................................................................... 293299
Appendix E: Fee Schedule ............................................................................................................. 296302
54
Town of Seabrook Island Development Standards Ordinance 7
Article 1: Purpose, Organization and Enactment
ARTICLE
1
Purpose, Organization,
and Enactment
Town of Seabrook Island
Development Standards Ordinance
55
Town of Seabrook Island Development Standards Ordinance 8
Section 1.1 Title and Purpose
A. This ordinance shall be known as the “TOWN of Seabrook Island Development Standards
Ordinance” and may also be referred to as the “DSO” or “this ordinance.”
B. The purpose of this ordinance is to:
1. guide DEVELOPMENT in accordance with existing and future needs;
2. protect, promote, and improve the public health, safety, morals, convenience, order,
appearance, prosperity, and general welfare;
3. preserve the environmental character of the community;
4. facilitate the timely and adequate provision of water, sewage disposal, other UTILITY
services, parks, and other public infrastructure;
5. regulate the density and distribution of populations and the uses of BUILDINGs,
STRUCTUREs and land for trade, residence, recreation, and conservation;
6. secure safety from fire, FLOOD, and other dangers; and
7. further the public welfare in any other regard specified by TOWN COUNCIL.
C. In accordance with the South Carolina Local Government Comprehensive Planning Enabling
Act, this ordinance is based on a COMPREHENSIVE PLAN for the TOWN, which promotes
safeguarding the character and unique resources of the community, while providing for a
range of land uses in harmony with that character and the ability to provide public services.
Section 1.2 Enabling Authority
A. The TOWN COUNCIL is authorized to adopt this ordinance pursuant to the enabling authority
contained in the S.C. Code of Laws, Sections 6-29-710, et. seq., and all other relevant laws of
the State of South Carolina.
B. Whenever any provision of this ordinance refers to or cites a section of the S.C. Code of Laws
and that section is later amended or superseded, this ordinance shall be deemed amended to
refer to the amended section or the section that most nearly corresponds to the superseded
section.
Section 1.3 Scope and Interpretation
A. This ordinance affects and regulates the use, DEVELOPMENT, preservation, and occupancy of
all land, BUILDINGs, and STRUCTUREs within the TOWN.
B. In the interpretation and application of this ordinance, all provisions shall be considered as
minimum requirements, liberally construed in favor of the TOWN COUNCIL, and deemed
neither to limit nor repeal any other powers granted under state law. This ordinance is not
intended to repeal, abrogate, or impair any existing EASEMENTs, covenants, or deed
restrictions.
56
Town of Seabrook Island Development Standards Ordinance 9
Section 1.4 Conflicting Regulations
This ordinance affects and regulates the use, DEVELOPMENT, preservation, and occupancy of all
land, BUILDINGs, and STRUCTUREs within the TOWN. In those instances where the ordinance
imposes greater limitations or restrictions than those imposed by the provisions of other
ordinances, instruments of land conveyance, private restrictions or land use covenants, or other
laws or instruments purporting to affect land use, the provisions of this ordinance shall control.
Whenever the provisions of any other statute or regulation require more restrictive standards than
are required by this ordinance, the provisions of such statute or regulation shall govern.
Section 1.5 Effect of this Ordinance
No land, BUILDING, STRUCTURE, or other premises shall be used, developed, or occupied and
no BUILDING or STRUCTURE shall be constructed, reconstructed, moved, removed, extended,
enlarged, or altered except in compliance with the provisions of this ordinance.
Section 1.6 Vested Rights
A. Findings.
1. The General Assembly of the State of South Carolina, by Act 287 of 2004, amended the
South Carolina Local Government Comprehensive Planning Enabling Act (Title 6, Chapter
29 of the S.C. Code of Laws) to add Article 11 cited as the “Vested Rights Act.”
2. TOWN COUNCIL has determined that it is in the best interest of the TOWN to avoid the
default provisions and to maintain and allow for local government control and flexibility of
local planning and zoning functions to the extent allowed by law.
B. Establishment and Conditions of Vested Rights.
1. Vested Rights Established. A vested right to develop property in accord with a site-specific
development plan is triggered upon the final approval of the site-specific development
plan by the reviewing authority authorized to approve the site-specific development plan,
and the payment to the TOWN of all applicable established fees. While the TOWN may
approve grading, installation of utilities, streets, or other infrastructure under separate
permits in anticipating site-specific development plan approval, any such construction or
any expenditure in preparing documents for further permits is done at risk, since rights are
not vested in the site-specific development plan until it is approved and fees paid.
2. Subject to the South Carolina Code of Laws and Legislative Joint Resolutions. Except as
hereinafter set forth, a vested right established by this ordinance is subject to the
conditions and limitations set out in Sections 6-29-1540 and 6-29-1550 of the Code of
Laws of South Carolina, as enacted by Act 287 of 2004, and subsequent joint resolutions
so long as they are in effect.
3. Expiration and Extension.
a. A vested right for an approved site-specific development plan expires two (2) years
after the date of final approval by the review authority authorized to approve a site-
57
Town of Seabrook Island Development Standards Ordinance 10
specific development plan. A vested site-specific development plan may be amended
if the amendment conforms to, or does not cause greater nonconformity with, the then
current provisions of this ordinance, municipal code sections, or other applicable
regulations. Approval or conditional approval of an amendment does not re-set or re-
start the expiration period of a vested right.
b. No sooner than three (3) months, and no later than 45 days prior to the expiration of
the two-year vested right period for an approved site-specific development plan, the
landowner of property with a vested right may apply to the ZONING ADMINISTRATOR
for an annual extension of the vested right. The ZONING ADMINISTRATOR must
approve the vested right extension, unless an amendment to the land development
ordinance or regulations has been adopted that prohibits approval. No more than five
(5) annual extensions of the vested right may be approved.
4. Phased DEVELOPMENT Plans. No vested rights are established for phased development
plans, including approved or conditionally approved phased development plans and
those plans applicable to lands proposed for annexation, unless approved under a
DEVELOPMENT agreement or such development conditions as may be adopted pursuant
to Section 7.4(c)(4). An approved or conditionally approved site-specific development
plan, meeting the requirements of Article 14, is required prior to approval with respect to
each phase of a phased development plan.
Section 1.7 Rules of Construction
A. The words, terms, and phrases used in this ordinance shall have the meaning assigned to
them in Appendix A - Definitions, except where the context clearly indicates a different
meaning.
B. The following rules shall apply for construing or interpreting the terms and provisions of this
ordinance:
1. Meanings and Intent. All provisions, terms, phrases, and expressions contained in this
ordinance shall be construed according to the purpose statements set forth throughout
this ordinance. When a specific section of this ordinance gives a different meaning than
the general definition provided in Appendix A, the specific section’s meaning and
application of the term shall control.
2. Headings, Illustrations, and Text. In the event of a conflict or inconsistency between the
text of this ordinance and any heading, caption, figure, illustration, table, or map, the text
shall control.
3. Lists and Examples. Unless otherwise specifically indicated, lists of items, or examples that
use terms such as "for example," "including," and "such as," or similar language are
intended to provide examples and are not exhaustive lists of all possibilities.
4. Computation of Time. The time in which an act is to be done shall be computed by
excluding the first day and including the last day. If a deadline or required date of action
falls on a Saturday, Sunday, or holiday observed by the TOWN, the deadline or required
date of action shall be the next day that is not a Saturday, Sunday, or holiday observed by
the TOWN. References to days are calendar days unless otherwise stated.
58
Town of Seabrook Island Development Standards Ordinance 11
5. References to Other Regulations/Publications. Whenever reference is made to a
resolution, ordinance, statute, regulation, or document, it shall be construed as a
reference to the most recent edition of such regulation, resolution, ordinance, statute,
regulation, or document, unless otherwise specifically stated.
6. Delegation of Authority. Any act authorized by this ordinance to be carried out by the
TOWN ADMINISTRATOR, ZONING ADMINISTRATOR, or other TOWN employee may be
carried out by a designee of that employee.
7. Technical and Non-Technical Terms. Words and phrases shall be construed according to
the common and approved usage of the language, but technical words and phrases that
may have acquired a peculiar and appropriate meaning in law shall be construed and
understood according to such meaning.
8. Public Officials and Agencies.
a. All public officials, bodies, and agencies, and departments to which references are
made are those of the TOWN, unless otherwise indicated.
a.b. In the event this ordinance makes reference to a specific official, body, agency,
department, or political subdivision of the county, state, or federal government, which
is subsequently renamed, consolidated, or eliminated following the effective date of
this ordinance, it is the intent of this ordinance that such reference shall apply to the
lawful successor having jurisdiction over the subject matter, as applicable.
8.9. Mandatory and Discretionary Terms. The words "shall," "must," and "will" are mandatory in
nature, establishing an obligation or duty to comply with the particular provision. The
words "may" and "should" are permissive in nature.
9.10. Conjunctions. Unless the context clearly suggests to the contrary, conjunctions
shall be interpreted as follows:
a. "And" indicates that all connected items, conditions, provisions, or events apply; and
b. "Or" indicates that one (1) or more of the connected items, conditions, provisions, or
events apply.
10.11. Tenses, Plurals, and Gender. Words used in the present tense include the future
tense. Words used in the singular number include the plural number and the plural
number includes the singular number, unless the context of the particular usage clearly
indicates otherwise. Words used in the masculine gender include the feminine gender,
and vice versa.
11.12. Measuring Distance. Unless specified otherwise, in those provisions that require
separation between uses or properties, measurement of distance shall be from nearest
property line to nearest property line.
Section 1.8 Repeal of Ordinances
59
Town of Seabrook Island Development Standards Ordinance 12
A. The repeal of any language within this ordinance, or any expiration by virtue of any provision
contained within the ordinance, shall not affect any right accrued, any offense committed, any
penalty or punishment incurred, or any proceeding commenced before the repeal took effect
or the regulation expired.
B. When any language which repealed another provision shall itself be repealed, the previous
language shall not be revived without being approved as a text amendment to this ordinance,
as detailed in Article 19.
Section 1.9 Severability
If any section, subsection, clause, or provision of these regulations shall be held to be invalid or
unconstitutional by any court of competent jurisdiction, such holding shall not affect any other
section, subsection, clause, provision. or portion of these regulations which is not invalid or
unconstitutional.
Section 1.10 Enactment and Effective Date
A public hearing having been held as required by the S.C. Code of Laws, Sections 6-29-710, et.
seq., as amended, and all other relevant laws of the state of South Carolina, the provisions of this
ordinance are hereby adopted, and shall take effect on July 1, 2022. Whenever used in this
ordinance, the term "effective date of this Ordinance" shall mean July 1, 2022.
60
Town of Seabrook Island Development Standards Ordinance 13
Article 2: General Provisions
ARTICLE
2
General Provisions
Town of Seabrook Island
Development Standards Ordinance
61
Town of Seabrook Island Development Standards Ordinance 14
Section 2.1 General Compliance
A. Ordinance Compliance.
1. Except as otherwise provided in this ordinance, no BUILDING, STRUCTURE, or premises
shall be used or occupied; and no BUILDING or part of any BUILDING or other
STRUCTUREs shall be erected, razed, moved, placed, reconstructed, extended, enlarged,
or altered, except in conformity with the provisions of this ordinance.
2. No LOT may be altered or diminished in size to less than the minimum requirements of
this ordinance; provided, a LOT may be reduced below the requirements of this
ordinance to meet the needs of a PRIVATE or PUBLIC UTILITY (e.g., a pumping station or
electrical substation).
B. Unlawful BUILDINGs and Uses. Any BUILDING, use, or LOT which has been unlawfully
constructed, occupied, or created prior to the date of adoption of this ordinance shall
continue to be unlawful, unless expressly permitted by this ordinance. Such unlawful
BUILDINGs, uses, or LOTs shall not be considered to be NONCONFORMING BUILDINGs,
uses, or LOTs of record and shall not be afforded any protections or allowances otherwise
granted to legally NONCONFORMING BUILDINGs, uses, or LOTs.
C. Withholding Approval. The TOWN COUNCIL, PLANNING COMMISSION, Board of Zoning
Appeals, ZONING ADMINISTRATOR, or other authorized board, commission, or
administrative staff may, in its sole discretion, withhold approval of any plan, use, or permit
request pending receipt of permits or approvals from other local, county, state, or federal
departments or agencies.
D. Excavations or Fill.
1. The construction, MAINTENANCE, or existence within the TOWN of any unprotected,
unbarricaded, open, or dangerous excavations, holes, pits, or wells, which constitute or
are likely to constitute a danger or menace to the public health, safety, or welfare, is
hereby prohibited; provided, this subsection shall not apply to the following:
a. any excavation under a permit issued by the ZONING ADMINISTRATOR where such
excavation is properly protected and warning SIGNs are posted in such manner as
approved by the TOWN; and
b. natural water bodies, marshes, ditches, reservoirs, and other such bodies of water
created or existing by authority of governmental units or agencies.
2. No property shall be increased in size by filling any CRITICAL AREA or WATERBODY by
any method.
E. Lighting.
1. Purpose. The purpose of this subsection is to permit reasonable uses of outdoor lighting
for night-time safety, utility, security, productivity, enjoyment, and commerce while
minimizing the effects of excessive or uncontrolled light in order to:
62
Town of Seabrook Island Development Standards Ordinance 15
a. Maintain consistent and uniform light levels for traffic and pedestrian safety along
streets, sidewalks, and in PARKING LOTs;
b. Ensure uniform lighting for security and law enforcement;
c. Minimize glare, obtrusive light, and artificial sky glow by limiting outdoor lighting that
is misdirected, excessive, or unnecessary;
d. Curtail and reverse the degradation of the nighttime environment and the night sky;
e. Prevent impacts upon shoreline wildlife;
f. Minimize light pollution and light trespass from light sources onto adjacent properties;
and
g. Conserve energy and resources to the greatest extent possible.
2. Applicability. These provisions shall apply to all new DEVELOPMENT subject to this
ordinance, unless otherwise specified. When a BUILDING, STRUCTURE, or lighting fixture
is extended, enlarged, or reconstructed after the effective date of this ordinance, the
applicable lighting standards shall apply.
3. Exemptions. The following lighting types shall be exempt from the lighting standards of
this subsection:
a. lighting within swimming pools or other water features that are governed by
SCDHECSCDES regulations;
b. exit SIGNs, stairs, ramps, and other illumination required by BUILDING CODES;
c. holiday decorations;
d. lighting of the American and government flags; and
e. any lighting fixture that is exempt from the provisions of this subsection by state
and/or federal law.
4. Prohibitions. The following types of lighting features shall be prohibited:
a. search lights,
b. strobe lights,
c. laser source lights,
d. any similar high-intensity or flashing light, except in emergencies by police and fire
personnel or at their direction, and
e. Mercury Vapor fixtures.
63
Town of Seabrook Island Development Standards Ordinance 16
5. Standards. Unless otherwise specified, the following standards shall apply to lighting
fixtures in all zoning districts and applications, except those located within a street right-
of-way and approved by the TOWN or SIPOA.
a. General
i. All exterior illuminating devices, except as may be specifically exempt, shall be
hooded or shielded to prevent glare and light spill onto adjoining properties.
ii. No light fixture shall exceed a height of 24 feet, measured from the ground to the
top of the fixture; provided, the Planning Commission may approve taller fixtures
for athletic fields where it is demonstrated that such fixtures will be properly
positioned and shielded to prevent light trespass and glare onto adjoining
properties; not impact shoreline wildlife; and not degrade the nighttime
environment.
iii. Light sources shall not be aimed at adjoining properties, streets, beaches, or
upward, except in accordance with paragraph 5(d) below.
iv. To control light spill and glare, lighting fixtures shall be properly aimed when
installed, and proper aiming shall be maintained at all times.
v. Canopy or under soffit fixtures shall be recessed into the soffit, shall not be visible
from off-site, and shall not emit any glare.
vi. No light fixture shall be permitted within 25 feet of the CRITICAL LINE or any
BEACH TRUST property.
b. Nonresidential Lighting
i. Light levels in PARKING LOTs shall be reduced during non-business or non-use
hours.
ii. SIGNs shall not be illuminated between the hours of 11:00 PM and 6:00 AM or
during any period of time when the establishment is not in use, whichever is more
restrictive.
c. Residential Lighting.
i. Light fixtures in any residential district, including RESIDENTIAL USEs within the
mixed-use district, shall not exceed 16 feet in height.
ii. Light fixtures mounted on a BUILDING in a residential district may not be mounted
above the 1st floor of the BUILDING.
iii. Bollard lights are permitted to light driveways and pedestrian areas.
d. Accent lighting. Accent lighting for sculptures, statues, trees, landscape features, flags,
SIGNs, architectural features, and entrances may orient light upward, provided the
directed light shall be substantially confined to the object intended to be illuminated
64
Town of Seabrook Island Development Standards Ordinance 17
to minimize glare, sky glow, and light trespass. Accent lighting shall not shine directly
into the window of a neighboring STRUCTURE or directly onto a street.
e. Gas lamp fixtures. Fixtures with clear, seeded, and/or translucent glass are permitted
only when used with low wattage “flicker” bulbs that mimic gas lamps. Use of frosted
bulbs is not a substitute for using Dark Sky compliant fixtures. Lamp types shall
produce a light color that is in the color spectrum between 2700 and 3100 Kelvin.
Lamp types producing a light color outside this range (e.g., mercury vapor, sodium
vapor, CFL, and others) are prohibited. All lamps/light fixtures shall provide a color
rendering index (CRI) of 85 or higher.
f. SIGN lighting. Illumination of SIGNs shall comply with the requirements of Article 13.
Internally illuminated SIGNs are not permitted and light fixtures directed at a SIGN
may only be permitted where the fixtures are shielded so not to cause visible glare to
PERSONs on adjacent streets or adjacent property.
g. Decorative or aesthetic light fixtures. The ZONING ADMINISTRATOR may approve
decorative or aesthetic lighting fixtures, including those that do not orient all light
downward, if the following conditions are met:
i. The fixtures shall not exceed the maximum height specified in this subsection;
ii. The fixtures shall offer a design element that is complementary to the architectural
style of the adjacent BUILDING(s); and
iii. The fixtures shall not negatively impact neighboring residential properties or any
street right-of-way.
6. Photometric Plan. A photometric plan, prepared by a registered lighting engineer, is
required as part of any development plan reviewed by the PLANNING COMMISSION. The
photometric plan shall be overlain on the development plan illustrating the proposed
layout of lighting fixtures and foot-candles of site lighting. The following are required for
review:
a. Lighting plan showing light pole and fixture locations and type designations;
b. Photometric plan showing horizontal luminance levels in a point-by-point format with
contour lines. Canopy lighting will also be included in luminance levels;
c. Lighting manufacturers’ equipment specifications and data sheets on the photometric
plan; and
d. Any other presentations required to convey the intent of the design.
Section 2.2 BUILDINGs
A. ACCESSORY BUILDINGs.
65
Town of Seabrook Island Development Standards Ordinance 18
1. ACCESSORY BUILDINGs or GARAGEs shall be considered to be part of the main
BUILDING if structurally and architecturally integrated into the main BUILDING, or if
attached by an enclosed breezeway or similar enclosed STRUCTURE.
2. Detached ACCESSORY BUILDINGs shall not be located closer than 10 feet to the main
BUILDING or any structural appurtenance attached to the main BUILDING, such as a
PORCH or raised DECK.
3. No ACCESSORY BUILDING, other than detached GARAGEs, shall be located in a FRONT
YARD.
4. Accessory STRUCTUREs, such as gazebos and similar roofed, but unenclosed,
STRUCTUREs, shall not be permitted within a residential zoning district, except if attached
to the principal dwelling.
5. No ACCESSORY BUILDING shall be constructed on a LOT before the principal BUILDING
or use is constructed or established on the LOT.
6. Unless otherwise provided in this ordinance, ACCESSORY BUILDINGs and GARAGES shall
meet the minimum SETBACK requirements for principal BUILDINGS in all zoning districts.
7. If a detached GARAGE is accessed from an alley, there shall be no rear SETBACK
requirement.
8. The maximum total floor area of all ACCESSORY BUILDINGs on a SINGLE-FAMILY LOT
shall not exceed 50 percent of the ground floor area of the dwelling or 600 sq. ft.,
whichever is less.
9. In the R-CL, R-TH, and R-MF districts, detached GARAGEs shall be exempt from limits on
number and size. In addition, up to three (3) ACCESSORY BUILDINGs serving a
DEVELOPMENT of multiple-family or TOWNHOME units may be permitted for
MAINTENANCE and storage.
10. The area of ACCESSORY BUILDINGs shall be included in the maximum LOT COVERAGE.
11. The maximum BUILDING HEIGHT of an ACCESSORY BUILDING shall not exceed 14 feet.
12. No ACCESSORY BUILDING, except as may otherwise be permitted in this ordinance, shall
be occupied or rented for RESIDENTIAL USE.
B. Restoring Unsafe BUILDINGs. Nothing in this ordinance shall prevent the strengthening or
restoration to a safe condition of any part of any BUILDING or STRUCTURE declared unsafe by
the BUILDING OFFICIAL or required to comply with his or her lawful order; provided, such
restoration shall be subject to and completed in accordance with the applicable BUILDING
CODES and all other applicable ordinances.
Section 2.3 LOTs
A. CORNER LOTs. On CORNER LOTs, the minimum FRONT YARD requirement shall be met on
each street. Each CORNER LOT shall be comprised of two (2) FRONT YARDs and two (2) SIDE
66
Town of Seabrook Island Development Standards Ordinance 19
YARDs. CORNER LOTs shall have extra widths where necessary to permit the establishment of
clear vision corners, as required at Section 2.4 A.
B. CUL DE SAC Lots. In the case of LOTs abutting CUL DE SAC streets, the minimum required
LOT WIDTH shall be measured at the required front SETBACK line. CUL DE SAC lots shall
have a minimum width of 40 feet at the front lot line.
C. THROUGH LOTs. On THROUGH LOTs, the minimum FRONT YARD requirement shall be met
on each street.
D. Minimum LOT FRONTAGE. All LOTs and
parcels created after the effective date of this
ordinance shall have FRONTAGE upon and
be accessed from a public or PRIVATE STREET
right-of-way.
E. Required Area or Space. No LOT or LOTs in
common ownership and no yard, court,
parking area, or other space shall be so
divided, altered, or reduced as to make the
area or space smaller than the minimum
required for the district under this ordinance
in which it is located. If already less than the
minimum size required, the area or space
shall not be further divided or reduced.
Section 2.4 SETBACKs
A. Clear Vision Corner. In all zoning districts, SIGNs, FENCEs, walls, STRUCTUREs, benches,
shrubbery, or other potential obstructions to vision, shall not be permitted to exceed a height
of three (3) feet above the center line FINISHED GRADE of the road within a triangular area
formed by the intersection of the street right-of-way lines and a line connecting two points
located on those intersecting right-of-way lines 25 feet from the point where the right-of-way
lines intersect; provided, UTILITY poles, street lights, and street signs shall be exempt from
this requirement.
B. Driveways.
1. No part of a driveway for a SINGLE-FAMILY residence shall be closer than three (3) feet to
the side property lines on NONCONFORMING lots and six (6) feet on all other LOTs.
2. Residential driveways shall be at least 12 feet wide.
3. No residential driveway shall be constructed within 50 feet of an intersecting street right-
of-way.
4. A shared driveway for cluster, TOWNHOME, or MULTI-FAMILY LOTs or DEVELOPMENTs
is permitted to cross property lines for those properties accessed by that driveway.
67
Town of Seabrook Island Development Standards Ordinance 20
a. All such driveways shall be engineered on SITE DEVELOPMENT PLANs and presented
to the ZONING ADMINISTRATOR at the time of application. With the approval of the
PLANNING COMMISSION, shared driveways for cluster, TOWNHOME, and MULTI-
FAMILY DEVELOPMENTs may be permitted.
b. In such instances, the driveway must be a minimum of 16 feet wide.
c. The ZONING ADMINISTRATOR must further certify that the proposed shared driveway
does not in any manner affect proper ingress or egress to the properties sharing such
driveway or other adjoining properties.
d. Where shared driveways are approved, REGIME covenants must clearly define
ownership and MAINTENANCE responsibilities of the owners sharing the driveway.
C. FRONT YARDs. All yards abutting upon a street right-of-way, whether public or private, shall
be considered as FRONT YARDs for SETBACK purposes, except as otherwise provided in this
ordinance.
D. Encroachments in Right-of-Way. No BUILDINGs, STRUCTUREs, service areas, or off-street
parking and loading facilities, except driveways, shall be permitted to encroach into street
rights-of-way.
E. Encroachments into Required Yards. Certain STRUCTUREs and architectural features may
project into the required yard SETBACKs, as shown in Table 2-4 E.
Table 2-4 E, Encroachments into Required SETBACKs
Type of Feature Maximum Allowed Encroachments into a SETBACK
FRONT YARD SIDE YARD REAR YARD
Accessory STRUCTUREs See Section 2.2 A
Accessible ramps, wheelchair
lifts and similar STRUCTUREs
Least encroachment necessary to provide a reasonable
accommodation pursuant to the Federal Fair Housing Act
(FHA) and Title II of the Americans with Disabilities Act (ADA)
Air conditioning units,
generators, and other
mechanical equipment,
including associated stands
None None / 5 ft.1 None / 5 ft.1
DECKs and PERVIOUS PATIOs None None None / 10 ft.2
Driveways See Section 2.4B
Eaves and gutters None / 18 in.3 None / 18 in.3 None / 18 in.3
FENCEs and walls See Section 2.5 B.
1 In the R-SF3, R-CL, R-TH, and R-MF districts only, air conditioning units, generators, and other mechanical
equipment, including associated stands, may extend no more than five (5) feet from the outer wall of a residential
BUILDING; provided, however, the equipment may be no closer than three (3) feet to an adjoining property line or
six (6) feet from a neighboring STRUCTURE. Equipment shall not be located within any EASEMENT, except with
written permission of the EASEMENT holder.
2 Open DECKs and PERVIOUS PATIOs may encroach up to ten (10) feet into the required REAR YARD SETBACK
on any residential zoned LOT which abuts a golf course or OPEN SPACE.
3 For residential lots with less than 17,500 square feet of HIGH GROUND, eaves and gutters may encroach up to
eighteen (18) inches into the required SETBACK.
68
Town of Seabrook Island Development Standards Ordinance 21
Stairways and stoops,
uncovered and unenclosed None / 10 ft.4 None None / 10 ft.2
SIGNs See Article 13
F. SETBACK Requirements. All SETBACKs shall be measured from the property lines; provided,
if a beachfront jurisdictional line, CRITICAL AREA, or WATERBODY is present on the property,
the SETBACK shall be the greater of the minimum yard SETBACK or the Oceanfront and
North Edisto River SETBACK (Section 10.4 B), CRITICAL AREA SETBACK (Section 10.5 A) or
WATERBODY SETBACK (Section 10.5 B) , as applicable. If located on a PRIVATE STREET, the
SETBACK shall be measured from the right-of-way line or 30 feet from the edge of pavement,
whichever is greater. A BUILDING shall not be erected, converted, enlarged, reconstructed, or
structurally altered, except in conformity with the SETBACK requirements of the district in
which it is located.
G. SCDHEC-OCRMSCDES-BCM CRITICAL LINE. Whenever this ordinance requires
measurement from, or based on, the SCDHEC-OCRMSCDES-BCM CRITICAL LINE, the
CRITICAL LINE shall have been reviewed and certified by SCDHEC-OCRMSCDES-BCM within
the previous five (5) years. Notwithstanding this requirement, CRITICAL AREAs by their nature
are dynamic and subject to change over time. As such, in the event there is reason to believe
a CRITICAL AREA has changed since its last review (even if the review occurred within five (5)
years), the property owner may be required to have the CRITICAL LINE reviewed again and, if
such a change has occurred, relocated before making any determinations requiring a
measurement based on the CRITICAL LINE.
Section 2.5 STRUCTUREs
4 In the R-SF3 district, uncovered and unenclosed stairways and stoops may encroach up to ten (10) feet into the
required FRONT YARD SETBACK, but shall be no closer than twenty (20) feet from the street right-of-way.
69
Town of Seabrook Island Development Standards Ordinance 22
A. Awnings.
1. All awnings shall be securely attached to and supported by a BUILDING wall. No other
means of support will be approved.
2. No part of the awning or its supporting frame shall be less than seven (7) feet above the
surface over which it is erected.
3. No advertising shall be placed on any awning, unless specifically authorized in Article 13
as an awning SIGN and duly permitted by the town.
B. FENCEs and Walls.
1. FENCEs and walls, including retaining walls, shall be permitted in all zoning districts;
provided, they conform with the following:
a. Any open spaces or non-solid areas shall be evenly spaced.;
b. Walls must be made of stucco, cypress, pressure-treated wood, wood composite,
brick, stone, architectural concrete masonry units (CMU), or similar materials;
c. FENCEs must be made of stucco, cypress, pressure-treated wood, wood composite,
iron, powder coated aluminum, or similar materials. Chain link fences may be
permitted in the Agricultural (AGR), Recreation (RC), Camp St. Christopher (CSC), and
Community Facilities (CF) districts only. Barbed wire, concertina wire, razor wire, chain
link, poultry wire and vinyl are strictly prohibited in all zoning districts;
d. Walls and FENCEs shall be constructed with quality materials and workmanship in
accordance with prevailing BUILDING industry standards for appearance, soundness,
safety, and resistance to decay and weather, and shall be maintained in good REPAIR;
e. Walls and FENCEs shall be located no closer to a side or rear property line than fifty
percent (50%) of the required side or rear setback for principal structures;
f. No wall or FENCE shall be permitted within a required CRITICAL AREA or beachfront
SETBACK area;
g. No wall or FENCE shall be taller than six (6) feet in height, except in the Agricultural
(AGR), Recreation (RC), Camp St. Christopher (CSC), and Community Facilities (CF)
districts, where the maximum height shall be twelve (12) feet. Height shall be
measured from the finished elevation at its the base of the wall or FENCE to the its
highest point of the wall or FENCE. The maximum height limitation shall not apply to
walls and FENCEs which are located on property owned by the TOWN or any other
unit of government; provided, however, the PLANNING COMMISSION may allow a
wall or FENCE to exceed six (6) feet in height when the wall or FENCE is used to
screen a public BUILDING or storage yard, UTILITY STRUCTUREs or equipment, or an
approved outdoor storage area in a district zoned for conservation, business,
community facility, or recreation uses.
70
Town of Seabrook Island Development Standards Ordinance 23
h. Walls and FENCEs shall not exceed a height of three (3) feet within any sight
EASEMENT or clear vision corner;
i. When a wall or FENCE has both a finished side and an unfinished side, the finished
side shall face the adjoining property or, if on the interior of the site, shall face outward
toward the perimeter of the site;
j. Plant materials, where required, shall be installed on the exterior side of the wall or
FENCE; and
k. Walls and FENCEs shall not be constructed in a way that negatively impacts drainage
on the site or on adjacent properties.
2. The requirements of this section shall not apply to the REPAIR, replacement, or
reconstruction of any wall or FENCE which was legally in existence as of the effective date
of this ordinance. Any such wall or FENCE may be REPAIRed, REPLACEd, or
reconstructed, provided:
a. The extent of any NONCONFORMING element shall not be increased. For the
purpose of this section, the term “element” shall include the design, materials, height
and/or location of the existing FENCE;
b. The extent of any previously NONCONFORMING element may not be re-established
once that element has been brought into conformity, or made less
NONCONFORMING, with the provisions of this ordinance;
c. In the case of replacement or reconstruction, installation of the new wall or FENCE
shall be completed no more than 120 days following demolition or destruction of the
wall or FENCE which it will REPLACE. The ZONING ADMINISTRATOR may authorize a
one-time 60-day extension in the event he or she finds, in writing, that installation may
not be completed within 120 days due to circumstances which are beyond the
applicant’s control; and
d. Nothing in this paragraph shall be interpreted to conflict with or supersede the
requirements of the applicable BUILDING CODES.
3. The provisions of this section shall not apply to the construction and/or MAINTENANCE of
any wall, revetment, riprap, or similar STRUCTURE which has been duly permitted by the
SCDHEC-OCRMSCDES-BCM.
4. Whenever a hedge is used in landscaping BUILDINGs other than SINGLE-FAMILY homes,
the hedge shall be installed with plants of sufficient size and spacing as to attain the height
required and opacity of at least seventy-five percent (75%) within two (2) years of planting.
If a hedge is not in compliance with the above height and opacity requirements within two
(2) years after planting, the hedge must be completed with mature plants at the
developer’s expense.
C. Height Exceptions. The maximum BUILDING HEIGHT for any BUILDING in the Town shall be
thirty-six (36) feet above the DESIGN FLOOD ELEVATION, as required by Section 20-22 of the
Town Code; provided, however, the following exceptions shall apply:
71
Town of Seabrook Island Development Standards Ordinance 24
1. MULTI-FAMILY and commercial buildings may increase the maximum allowable height by
one (1) additional foot for each three (3) feet of additional FRONT YARD SETBACK, with a
maximum BUILDING HEIGHT of 40 feet above the required DESIGN FLOOD ELEVATION.
2. The maximum BUILDING HEIGHT for residential structures permitted on or after January
29, 2021, may be measured from the ALTERNATE DESIGN FLOOD ELEVATION; provided,
1) the ALTERNATE DESIGN FLOOD ELEVATION is higher than the DESIGN FLOOD
ELEVATION required at the time of permitting; and 2) the lowest floor elevation of the
residential structure also complies with the ALTERNATE DESIGN FLOOD ELEVATION
requirement.
3. Unless otherwise expressly stated, the height limitations of this ordinance shall not apply
to any of the following:
a. Farm buildings in the AGR zoning district;
b. Electrical power transmission lines;
c. Belfries, cupolas, spires, domes, monuments, flagpoles, chimneys, radio/television
receiving antennas or chimney flues; or
d. Bulkhead, elevator, water tank, or any other similar structure or necessary mechanical
appurtenance extending above the roof of any building, if such structure does not
occupy more than 33 1/3 percent of the area of the roof.
D. Mechanical Equipment.
1. Mechanical equipment located on the ground shall be located in the rear or SIDE YARD in
accordance with the requirements of Table 2-4 E.
2. When attached to a BUILDING, the mechanical equipment shall be architecturally
integrated or appropriately screened by shrubbery or fencing so as not to be visible from
neighboring property and to provide sound BUFFERing. Screening shall comply with the
requirements of Section 11.3 B.
3. If located on the roof of a BUILDING or in a location that cannot otherwise be screened,
the equipment shall be enclosed or designed in a manner that is architecturally integrated
with the BUILDING where it is located.
4. Mechanical equipment shall not be placed within any EASEMENT, except with written
permission of the EASEMENT holder.
5. The mechanical equipment shall be elevated to meet the requirements of Section 20-22 of
the Town Code and all applicable BUILDING CODES.
6. All such equipment shall be located to have the least adverse impact on surrounding
property owners.
7. A permit shall be obtained from the ZONING ADMINISTRATOR.
72
Town of Seabrook Island Development Standards Ordinance 25
E. Swimming Pools, Spas, Reflecting Ponds, and Hot Tubs. Any swimming pool, spa, hot tub,
reflecting pond, or similar STRUCTURE whose depth at any point exceeds 24 inches shall be
subject to the following regulations and shall be fenced securely, in accordance with the
applicable requirements of the BUILDING CODES.
1. Swimming pools, spas, hot tubs, reflecting ponds, and similar STRUCTUREs, including
changing rooms and mechanical equipment, shall only be permitted in the REAR YARD;
provided, on CORNER LOTs they may be located within a SIDE YARD.
2. Swimming pools, spas, hot tubs, reflecting ponds, and similar STRUCTUREs, whether
above or below ground, shall be subject to the minimum SETBACK requirements for
principal BUILDINGs.
3. AsWhen required by the currently adopted South Carolina BUILDING CODES, all in-
ground pools must be fenced.
a. The FENCE must be at least forty-eight (48) inches in height, with an opening in one
direction that does not exceed five and one-half (5½) inches.
b. The FENCE must be accented with landscaping on all exterior sides not abutting a
BUILDING so as to minimize its visual impact.
c. In lieu of fencing, certified mechanical pool covers may be approved by the ZONING
ADMINISTRATOR.
c.d. In lieu of a fence, a pool wall, structure wall, natural barrier, or other allowable
structure or feature may be permitted to serve as the required barrier when authorized
by the BUILDING CODES administrator.
d.e. Fencing material around community pools must be approved by the ZONING
ADMINISTRATOR. Only materials that are harmonious and architecturally compatible
with surrounding areas and DEVELOPMENTs shall be approved.
F. TEMPORARY STRUCTUREs or BUILDINGs.
1. TEMPORARY STRUCTUREs and Tents.
a. No STRUCTURE of a temporary nature shall be authorized or allowed to remain on any
property; and no trailer, camper, shack, tent, or other similar STRUCTURE shall be
used as a residence or for any other purpose, except for construction trailers and
temporary sanitary facilities as provided for elsewhere in this ordinance.
b. The erection of large tents and other TEMPORARY STRUCTUREs associated with
recreational activities and temporary events may be authorized by the ZONING
ADMINISTRATOR. In making such determination, the ZONING ADMINISTRATOR shall
consider traffic patterns to and from the STRUCTURE, its proximity to nearby
residences, potential noise from amplified music or other sources, the hours of the
event for which the tent or STRUCTURE is being erected, and the number of days it will
be present.
73
Town of Seabrook Island Development Standards Ordinance 26
c. All such STRUCTUREs or tents shall meet the minimum SETBACK requirements of the
zoning district in which they are located.
2. Temporary Storage Units.
a. It shall be unlawful to place or permit the placement of a temporary storage unit on
any property for more than seven (7) consecutive days; provided, a longer period may
be approved by the ZONING ADMINISTRATOR for BUILDING construction or
remodeling projects.
b. Temporary storage units shall only be placed upon or within a driveway, parking area
or, if access exists to the rear of the LOT, the REAR YARD.
c. No temporary storage unit shall be placed upon or within public property or a public
place including, without limitation, a street, sidewalk, or out lawn.
d. The temporary storage unit shall not exceed eight (8) feet in height, eight (8) feet in
width and 16 feet in length.
e. The temporary storage unit shall be secured in a manner that does not endanger the
safety of PERSONs or property in the vicinity of the unit.
f. The temporary storage unit shall be maintained in good condition, free from evidence
of deterioration, weathering, discoloration, graffiti, rust, ripping, tearing or other holes
or breaks at all times.
g. No temporary storage unit shall be used for human occupancy or to store solid waste,
construction debris, demolition debris, business inventory, commercial goods, or
goods for property other than the property where the storage unit is located or any
illegal or hazardous material. Upon reasonable notice, the ZONING ADMINISTRATOR
may inspect the contents of any temporary storage unit at any reasonable time to
ensure compliance with these requirements.
h. Any temporary storage unit which is not removed at the end of the time for which it
may lawfully remain in place, may be removed by the TOWN immediately, without
notice, and the violation shall be enforced in accordance with Article 22 of this
ordinance.
i. A SIGN identifying the storage unit supplier, mounted on the temporary storage unit,
shall not require a SIGN permit; provided, the storage unit complies with the
requirements of this subsection and all other applicable ordinances.
Section 2.6 USEs
A. Illegal Dwellings. The use of any floor area below BASE FLOOD ELEVATION for dwelling
purposes is prohibited in all zoning districts unless the floor area meets the applicable
BUILDING code requirements. BUILDINGs erected as GARAGEs or ACCESSORY BUILDINGs,
except approved ACCESSORY DWELLING UNITs, shall not be occupied for dwelling
purposes.
74
Town of Seabrook Island Development Standards Ordinance 27
B. PRINCIPAL USE. A LOT or parcel shall not be devoted to more than one (1) PRINCIPAL USE,
or contain more than one (1) principal BUILDING; except for groups of multiple family
BUILDINGs, TOWNHOMEs, business establishments, or other BUILDINGs which are
determined by the ZONING ADMINISTRATOR to be a PRINCIPAL USE collectively, based on
the following considerations:
1. individual BUILDINGs share common parking areas;
2. access to the BUILDINGs/uses is provided via shared access drives or streets;
3. BUILDINGs are under single ownership;
4. individual activities support one another (such as MARINA/convenience store or cycle
rental/RETAIL sporting goods); or
5. The BUILDING or USE is located within the MU Mixed Use zoning district.
C. Domestic Animals.
1. The keeping of household pets, including dogs, cats, fish, birds, hamsters, and other
animals commonly considered household pets is permitted in any residential district;
provided, no more than three (3) dogs or cats, six (6) months of age or older, in any
combination shall be kept or housed in or at one (1) dwelling.
2. The keeping of animals not generally considered to be household pets, including, but not
limited to, exotic animals and LIVESTOCK, horses, pigs, sheep, cattle, goats, and poultry is
prohibited in all zoning districts, except within the AGR, RC and CSC Districts.
D. Outdoor Storage. Outdoor storage of merchandise, equipment, supplies, products, or other
materials shall only be permitted as a CONDITIONAL USE within those districts and under
such conditions as specifically authorized by this ordinance.
E. Parking, Storage, and REPAIR of Vehicles.
1. In order to prevent nuisance effects within the community including, but not limited to,
noise, soil contamination, unsightly conditions, and diminution of property values, it shall
be unlawful for the owner, tenant, or lessee of any BUILDING or land within the TOWN to
permit the open storage or parking of any inoperable motor vehicle, machinery, or
equipment, or parts thereof, outside of an enclosed GARAGE or enclosed BUILDING.
Inoperable, for purposes of this subsection, shall mean motor vehicles, machinery, or
equipment which, by reason of dismantling, disrepair, or other cause, are incapable of
being propelled under their own power, operated or used, are unsafe for operation on
the streets and highways of this state because of the inability to comply with the South
Carolina Motor Vehicle Code, or do not have a current license and registration as required
for operation by the South Carolina Motor Vehicle Code.
2. The REPAIR, restoration, and MAINTENANCE of vehicles in any district shall be conducted
entirely within an enclosed BUILDING, except for vehicle cleaning, tire changing, or
replacement of a battery.
75
Town of Seabrook Island Development Standards Ordinance 28
3. It shall be unlawful for the owner, tenant or lessee of any LOT or BUILDING in a residential
district or on property containing a DWELLING UNIT to permit the open storage or
parking outside of a BUILDING of semi-truck tractors and/or semi-truck trailers, box trucks,
bulldozers, earth carriers, cranes, or any other similar equipment or machinery, unless
parked for purposes of construction, MAINTENANCE, moving, or similar purpose being
conducted on that LOT.
F. RECREATIONAL VEHICLE Storage. RECREATIONAL VEHICLEs shall only be stored within
areas specifically designated for that purpose as allowed by this ordinance.
G. Similar Uses. Every type of potential use cannot be addressed in this ordinance, each district
provides for "similar uses" referencing this section. All requests for a use not specifically
addressed in any zoning district shall be submitted to the ZONING ADMINISTRATOR for
review, based on the following standards.
1. A finding has been made by the ZONING ADMINISTRATOR that the proposed use is not
listed as a permitted or CONDITIONAL USE in any zoning district.
2. If the use is not addressed in this ordinance, the ZONING ADMINISTRATOR shall select
the use listed which most closely approximates the proposed use, using criteria such as
the nature of the use, conformance with the purpose of the zoning district in which it is
proposed, aesthetics, traffic characteristics, and potential nuisance effects including, but
not limited to, noise, vibration, dust, smoke, odor, glare, and hours of operation).
3. Once a similar use is determined, the use shall comply with any conditions and review
procedures that may apply to that use, including the CONDITIONAL USE requirements of
Article 9, as applicable.
4. If the ZONING ADMINISTRATOR determines a proposed use is not similar to any use
addressed in this ordinance, the applicant may petition TOWN COUNCIL for an
amendment to this ordinance, as described in Article 19.
5. The determination as to whether a proposed use is similar in nature and class to another
permitted or CONDITIONAL USE within a district shall be considered as an expansion of
the use regulations, not a VARIANCE applying to a particular situation. Any use
determined by the ZONING ADMINISTRATOR to be similar shall thereafter be included in
the enumeration of the uses.
H. Voting Place. The provisions of this ordinance shall not interfere with the temporary use of
any property as a voting place in connection with a federal, state, county, municipal, or other
public election.
Section 2.7 Utilities and Services
A. Essential Public Services. The erection, construction, alteration, or MAINTENANCE of
essential public services shall be permitted in any zoning district and shall be exempt from the
application of this ordinance; provided, BUILDINGs, parking areas, and other uses or
STRUCTUREs accessory to the essential service shall not be exempt and shall conform to all
applicable ordinance requirements and procedures. This provision, however, shall not be
76
Town of Seabrook Island Development Standards Ordinance 29
construed to waive the rights of the TOWN to require that specific services be installed
underground.
B. Water and Sanitary Sewer Service. No STRUCTURE for human occupancy shall, after the
effective date of this ordinance, be erected, altered, or moved upon any LOT or premises and
used, in whole or in part, for dwelling, business, industrial, institutional, or recreational
purposes unless provided with a safe, sanitary, and potable water supply and with a safe and
effective means of collection, treatment and disposal of human, domestic, commercial, and
industrial waste. Such installations and facilities shall conform to the minimum requirements
for such facilities as established by the State of South Carolina, Charleston County, the TOWN,
and other relevant government codes, ordinances, and standards.
C. Underground Storage Tanks. All underground storage tanks utilized for the storage of
propane gas, oil, fuel, or other substances shall be secured in place by straps, bands, or other
fastening devices sufficient to keep the tanks securely in place and to prevent them from
rising above ground level. Any underground storage tank already in place at the time this
ordinance is adopted shall be brought into compliance within two (2) years. Installing or
allowing the installation of an underground tank in violation of this ordinance shall be a
misdemeanor and prosecuted in accord with Article 22 of this ordinance. No underground
storage tank shall be located closer than 25 feet to a CRITICAL AREA or WATERBODY.
77
Town of Seabrook Island Development Standards Ordinance 30
Article 3: Zoning Districts and Map
ARTICLE
3
Zoning Districts
and Map
Town of Seabrook Island
Development Standards Ordinance
78
Town of Seabrook Island Development Standards Ordinance 31
Section 3.1 Districts Established
The following zoning districts are established by this ordinance:
Table 3-1, Zone Districts Established
Category Designation District Name
Conservation / Recreation Districts
CP Conservation
AGR Agricultural
RC Recreation
CSC Camp St. Christopher
Residential Districts
R-SF1 Large LOT SINGLE-FAMILY
R-SF2 Medium LOT SINGLE-FAMILY
R-SF3 Small LOT SINGLE-FAMILY
R-CL SINGLE-FAMILY Cluster
R-TH TOWNHOME
R-MF MULTI-FAMILY
Support Districts LC Limited Commercial
CF Community Facilities/Services
Mixed Use Districts MU Mixed Use
PD Planned Development
OVERLAY DISTRICT SIR Seabrook Island Road
Section 3.2 ZONING MAP
A. General. The official ZONING MAP designates the location and boundaries of the various
districts established in this ordinance within the TOWN. The official ZONING MAP shall be
kept on file in the office of the ZONING ADMINISTRATOR and be available for public
inspection during normal business hours. The original official version of the map shall be
identified by the signature of the mayor and attested by the TOWN clerk. Copies of the map
may be kept in hardcopy and digital form. The official ZONING MAP, together with any
amendments approved pursuant to Article 19, but not yet incorporated into the map, shall be
the final authority as to the status of the current zone district classification of all land within the
TOWN.
B. Amendments. The TOWN COUNCIL may, at its discretion or upon formal application, amend
the ZONING MAP, in accordance with the amendment procedures of Article 19.
Section 3.3 District Boundaries Interpreted
A. Boundaries indicated as approximately following the centerline of streets, highways, or alleys
shall be construed to follow such centerlines.
B. Boundaries indicated as approximately following platted lot lines shall be construed as
following such lot lines.
C. Boundaries indicated as approximately following TOWN boundaries shall be construed as
following TOWN boundaries.
D. Boundaries indicated as approximately following the centerline of creeks, streams or rivers
shall be construed as following such creeks, streams, or rivers, or in the event of change in the
79
Town of Seabrook Island Development Standards Ordinance 32
location of creeks, streams, or rivers, shall be construed as moving with the creek, stream, or
river.
E. Boundaries indicated as approximately following the edge of a marsh or the SCDHEC-
OCRMSCDES-BCM CRITICAL LINE shall be construed as following that marsh or SCDHEC-
OCRMSCDES-BCM CRITICAL LINE, or in the event of change in location of that marsh edge or
CRITICAL LINE, shall be construed as moving with the marsh edge or CRITICAL LINE.
F. Boundaries indicated as approximately following property lines, section lines or other lines of
government survey shall be construed as following such property lines, section lines, or other
lines of government survey as they exist as of the effective date of this ordinance or applicable
amendments thereto.
Section 3.4 LOTs Divided by a Zoning Line
Where a zoning line divides a LOT or where two (2) LOTs in different districts are combined, the
entire LOT shall be considered to be wholly within the less intense zoning district. Where two (2)
LOTs are combined and one of the LOTs is within an OVERLAY DISTRICT, the entire LOT shall be
considered to be wholly within the OVERLAY DISTRICT. Table 2-1 lists districts from least intense
to most intense.
Section 3.5 Zoning of Vacated Areas
Whenever any street, alley, or other public way within the TOWN is vacated by official
governmental action, and when the lands within those vacated lands attach to and become a part
of lands adjoining the street, alley, or public way, those lands shall automatically be subjected to
the same zoning regulations as are applicable to the adjoining lands.
Section 3.6 Zoning of Annexed Property
Each annexation petition shall be accompanied by an application for ZONING MAP amendment.
The purpose of the ZONING MAP amendment is to amend the official ZONING MAP of the
TOWN to assign a zoning designation to the subject property upon its annexation into the
corporate limits of the TOWN. The ZONING MAP amendment shall be considered concurrently
with the annexation petition; provided, the ZONING MAP amendment shall be processed and
considered in accordance with the provisions set forth in Article 19 of this ordinance.When land is
annexed into the TOWN, its zoning designation shall be as established by the annexation
ordinance. In instances when the zoning designation of land annexed into the TOWN is not
established by the annexation ordinance, it shall be zoned R-SF1 until or unless the TOWN
COUNCIL takes action to classify it as another zone district.
80
Town of Seabrook Island Development Standards Ordinance 33
Article 4: Conservation/Recreation Districts
ARTICLE
4
Conservation /
Recreation Districts
Town of Seabrook Island
Development Standards Ordinance
81
Town of Seabrook Island Development Standards Ordinance 34
Section 4.1 Purpose
A. CP, Conservation District. This district is established for the purpose of protecting and
conserving CRITICAL AREAS and WETLANDs, wildlife habitats, other sensitive environmental
areas, and those areas otherwise encumbered by conservation EASEMENTs. In addition, all
areas within the corporate limits of the TOWN lying seaward of the SCDHEC-OCRMSCDES-
BCM CRITICAL LINE are included.
B. AGR, Agricultural District. The purpose of this district is to provide for and protect
traditional, low intensity agricultural, farming, and recreational activities, together with very
low-density single-family residential development.
C. RC, Recreation District. This district provides for designated active and passive leisure
amenities, both public and private, that contribute to the enjoyment and relaxation of life on
Seabrook Island.
D. CSC, Camp St. Christopher District. This district is established to preserve the historically
significant and environmentally sensitive property occupied by the non-profit camp and
conference center and to support its continued operation. The district allows those uses that
currently exist, along with others that may be added in support of the camp’s mission and are
commonly associated with such facilities, but not including for-profit commercial uses.
Section 4.2 Schedule of Uses
BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the
following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs
in the districts indicated at the top of Table 4-2 may be used for the purposes denoted by the
following abbreviations:
A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right.
B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right,
provided the specific conditions related to that use, as found in Article 9 are met.
C. Specific Conditions. Indicates the relevant section outlining the specific requirements or
conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the
general criteria of Section 9.3.
82
Town of Seabrook Island Development Standards Ordinance 35
Table 4-2 Schedule of Uses: Conservation/Recreation Districts
USE
CP
AGR
RC
CSC Specific
Conditions
ACCESSORY USEs
ACCESSORY USEs and STRUCTUREs P P P P
Agriculture and Conservation
Agriculture P
Bulkhead and EROSION control devices P P P P
Community gardens P P P P
Open space preserves such as
WETLANDs and wildlife habitat refuge
areas
P P P P
Entertainment, Hospitality, and Leisure
Boat docks, landings and launches P
Classroom and lecture facilities P
Community swimming pools P
Dormitories, cabins, and cafeterias for
campers and conference attendees, not
including for-profit HOTELs
P
Equestrian facilities P P P
Fitness club/health spa P P
Golf course/country club, including
ACCESSORY USEs such as
MAINTENANCE facilities, pro shops,
lounges, banquet facilities, and
RESTAURANTs.
P P
Greenways, boardwalks, and non-
motorized trails/pathways P P P P
Gymnasium and indoor recreation
facilities P P P
MARINA C Section 9.4 H
OPEN AIR RECREATION uses C C C C Section 9.4 I
Office
Government offices P
Residential
ACCESSORY DWELLING UNITs C Section 9.4 A
HOME OCCUPATIONs C Section 9.4 F
SHORT-TERM RENTAL UNITs C Section 9.4 O
SINGLE-FAMILY DWELLINGs P
VACATION CLUB UNIT C Section 9.4 Q
Services
Cemetery P
PLACES OF PUBLIC WORSHIP P
UTILITY substation or subinstallation C C C Section 9.4 P
Wireless communication antennas or
towers C C Section 9.4 T
Other
Similar Uses C C C C Section 2.6 G
83
Town of Seabrook Island Development Standards Ordinance 36
Section 4.3 Spatial Requirements
A. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 4-3.
New LOTs shall not be created, except in conformance with these requirements.
Table 4-3. LOT and Width Requirements, Conservation/Recreation Districts
Zoning District Minimum LOT AREA
(sq. ft)
Minimum LOT WIDTH
(ft.)
Maximum
Residential
Density
(units/acre)
CP - - -
AGR 5 acres - 0.2
RC - - -
CSC 250 acres - -
B. All STRUCTUREs and their placement on a LOT shall conform to the minimum dimensional
requirements listed in Table 4-3a.
Table 4-3a. Dimensional Requirements, Conservation/Recreation Districts
Zoning District
Maximum
BUILDING HEIGHT
(ft./stories)
Minimum Yard SETBACKs (ft.)
Front Side Rear Parking BUILDING
CP 36 50 50 30 50
AGR
No max. for farm
buildings; 36 for all
other uses
100 100 50 50
RC 36 30 20 20 30
CSC 36 305 305 5 5
5 Front setbacks shall only apply along perimeter streets, not including interior streets within a development. No
minimum SIDE YARD shall be required; provided, a minimum separation distance of 15 feet shall be maintained
between all buildings. No REAR YARD shall be required; provided, a minimum setback of 20 feet shall be
required from the development’s perimeter property boundary.
84
Town of Seabrook Island Development Standards Ordinance 37
Section 4.4 Site Development Regulations
In addition to the requirements of this article, all DEVELOPMENT in the Conservation/Recreation
Districts shall meet the applicable requirements as listed elsewhere in this ordinance:
A. General Provisions – Article 2
B. Overlay Districts – Article 8
B.C. CONDITIONAL USE Requirements – Article 9
C.D. Environmental Performance Standards – Article 10
D.E. Trees, Landscaping and BUFFERing – Article 11
E.F. Parking and Loading – Article 12
F.G. SIGNs – Article 13
G.H. Site Plan Review – Article 14
85
Town of Seabrook Island Development Standards Ordinance 38
Article 5: Residential Districts
ARTICLE
5
Residential Districts
Town of Seabrook Island
Development Standards Ordinance
86
Town of Seabrook Island Development Standards Ordinance 39
Section 5.1 Purpose
The purposes of the residential districts, in general, are to: provide for quiet, low-density
residential neighborhoods; discourage unwarranted encroachment by regulating commercial
and other uses which would interfere with the development or continuation of residential uses;
minimize nonconformities; and discourage uses which would generate traffic on minor streets
other than required to serve residences on those streets.
A. R-SF1, Large LOT SINGLE-FAMILY. This district is created to retain the character of
established large-LOT SINGLE-FAMILY neighborhoods and to provide a district that would
allow for the creation of future estate-sized home sites. Other uses are also permitted that are
compatible with and supportive of the character of the homes in this district.
B. R-SF2, Moderate LOT SINGLE-FAMILY. It is the purpose of this district to encompass those
early SUBDIVISIONs that were developed prior to the incorporation of the TOWN and to
establish DEVELOPMENT standards based on the existing moderate density conditions that
will minimize nonconformities to the extent practical. Other uses are also permitted that are
compatible with, and supportive of, the character of the homes in this district.
C. R-SF3, Small LOT SINGLE-FAMILY. This district is intended to support established
DEVELOPMENT patterns of those existing SUBDIVISIONs containing SINGLE-FAMILY homes
on small LOTs and to reduce existing nonconformities to the extent practical.
D. R-CL, SINGLE-FAMILY Cluster. This district is intended to accommodate SINGLE-FAMILY
detached dwellings which are situated in a “cluster” style arrangement within a PLANNED
COMMUNITY, rather than on traditional SINGLE-FAMILY LOTs, and to provide greater
flexibility for their IMPROVEMENT and expansion.
E. R-TH, TOWNHOME. This district is established specifically to accommodate TOWNHOME
DEVELOPMENT at a reasonable density to afford an alternate form of residence within the
community.
F. R-MF, MULTI-FAMILY. This district is intended to support MULTI-FAMILY dwellings, including
CONDOMINIUMs and apartments, at moderate density as another residential option within
the community.
Section 5.2 Schedule of Uses
BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the
following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs
in the districts indicated at the top of Table 5-2 may be used for the purposes denoted by the
following abbreviations:
A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right.
B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right,
provided the specific conditions related to that use, as found in Article 9, are met.
87
Town of Seabrook Island Development Standards Ordinance 40
C. Specific Conditions. Indicates the relevant section outlining the specific requirements or
conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the
general criteria of Section 9.3.
Table 5-2 Schedule of Uses: Residential Districts
USE
R-SF1
R-SF2
R-SF3
R-CL
R-TH
R-MF
Specific
Conditions
ACCESSORY USEs
ACCESSORY USEs and
STRUCTUREs P P P P P P
Agriculture and Conservation
Open space preserves such as
WETLANDs and wildlife
habitat refuge areas
P P P P P P
Entertainment, Hospitality, and Leisure
Greenways, boardwalks, and
non-motorized trails/pathways P P P P P P
Non-commercial community or
neighborhood activity uses
such as, park/playground,
swimming pool, storage
STRUCTUREs, and off-street
parking
p p p p p p
Residential
ACCESSORY DWELLING
UNITs C C Section 9.4 A
HOME OCCUPATIONs C C C C C C Section 9.4 F
SHORT-TERM RENTAL UNITs C C C C C C Section 9.4 O
MULTI-FAMILY DWELLINGs P
SINGLE-FAMILY DWELLINGs P P P P
TOWNHOMEs P
TWO-FAMILY DWELLINGs P
VACATION CLUB UNIT C C C C C C Section 9.4 Q
Services
UTILITY substation or
subinstallation C C C C C C Section 9.4 P
Other
Similar Uses C C C C C C Section 2.6 G
Section 5.3 Spatial Requirements
A. Area and Width. All LOTs and BUILDINGs shall meet the minimum area and width
requirements of Table 5-3 based on the date on which they were recorded.
88
Town of Seabrook Island Development Standards Ordinance 41
Table 5-3. LOT and Width Requirements for LOTs Recorded Prior to or After July 1, 2022
Zoning
District
Lots Recorded Prior to July 1, 2022 Lots Recorded On/After July 1, 2022
Minimum
LOT AREA
(sq. Ft.)
Minimum
LOT
WIDTH
(ft.)
Maximum
Density
(units/acre)
Minimum
LOT AREA
(sq. Ft.)
Minimum
LOT
WIDTH
(ft.)
Maximum
Density
(units/acre)
R-SF1 32,670 100 1 65,3406,7 1256,7 0.6
R-SF2 17,500 85 2 21,7807 857 2
R-SF3 6,000 45 5 10,8907 457 4
R-CL 2 acres8 - 89 5 acres8 - 59
R-TH 2 acres8,10 - 149 5 acres8,10 - 79
R-MF 2 acres8 - 209 5 acres8 - 129
B. SETBACKs and Related Standards. All STRUCTUREs and their placement on a LOT recorded
prior to the adoption of this ordinance shall conform to the minimum dimensional
requirements listed in Table 5-3a. STRUCTUREs erected on new LOTs, recorded on or after
the adoption of this ordinance, shall conform with the requirements of Table 5-3b.
6 The spatial requirements for R-SF1-zoned LOTs developed as part of a CONSERVATION SUBDIVISION shall be
as provided in Section 5.4.
7 Any LOT which was created by the combination of two or more smaller LOTS by PLAT recorded prior to July 1,
2022, may be re-subdivided on or after July 1, 2022, even if the resulting LOTs do not conform to the minimum
LOT AREA and/or LOT WIDTH requirements specified herein, provided: 1) the property line(s) may only be re-
established in the same location(s) that existed immediately prior to the combination; and 2) no BUILDING,
STRUCTURE, or other site IMPROVEMENT may be made nonconforming with the current SETBACK or LOT
COVERAGE requirements as a result of the re-subdivision.
8 Minimum acreage applies to the GROSS ACREAGE of the development parcel.
9 Maximum density for CLUSTER UNITS, townhomes, and multiple family shall be calculated based on NET
ACREAGE.
10 Minimum LOT AREA and width for a two-family dwelling shall be the same as required for R-SF2.
89
Town of Seabrook Island Development Standards Ordinance 42
Table 5-3a. Dimensional Requirements for LOTs Recorded Prior to July 1, 2022
Zoning
District
Maximum
BUILDING
HEIGHT
(ft.)
Minimum Yard SETBACKs (ft.) LOT
COVERAGE
(%)
Min.
Floor
Area11
(sq. ft.)
Front Side
Rear Park’g. Bldg.12 Min. Sep.
R-SF1 36 - 30 15 - 25 35 1,200
R-SF2 36 - 30 1513 - 25 40 1,000
R-SF3 36 - 3014 7.515 1515 25 50 850
R-CL 36 - 2016 - 1515 17 40 11
R-TH 36 2016 2016 - 1515 17 50 11
R-MF 36 2016 3016 - 1515 17 60 11
Table 5-3b. Dimensional Requirements for LOTs Recorded On/After July 1, 2022
Zoning
District
Maximum
BUILDING
HEIGHT
(ft.)
Minimum Yard SETBACKs (ft.) LOT
COVERAGE
(%)
Min.
Floor
Area11
(sq. ft.)
Front Side
Rear Park’g
. Bldg.12 Min. Sep.
R-SF1 36 - 506 256 - 506 256 1,500
R-SF2 36 - 30 15 - 25 40 1,000
R-SF3 36 - 30 7.5 - 25 50 850
R-CL 36 - 3016 - 2518 19 40 11
R-TH 36 2016 3016 - 2518 19 50 11
R-MF 36 2016 3016 - 2518 19 60 11
11 Minimum LIVABLE FLOOR AREA requirements are for single family detached dwellings in the R-SF1, R-SF2, and
R-SF3 districts. The minimum required LIVABLE FLOOR AREA for units in the R-CL, R-TH and R-MF districts shall
be determined by the number of bedrooms, as follows: efficiency unit – 650, 1 bedroom – 800, 2 bedroom –
1,000, 3 bedroom – 1,200. An additional 100 square feet shall be provided for each bedroom over 3.
12 Average established setback shall apply, as applicable, in R-SF1, R-SF2, and R-SF3 Districts, per Section 5.3 C.
13 For lots with less than 13,500 square feet of HIGH GROUND, the minimum SIDE YARD SETBACK shall be 10
feet. For lots with greater than 13,500 square feet, but less than 17,500 square feet, of HIGH GROUND, the
minimum SIDE YARD SETBACK shall be 12.5 feet.
14 Where a LOT zoned R-SF3 fronts two intersecting streets wherein one street contains a CUL-DE-SAC, the
required FRONT YARD SETBACK from the street containing the CUL-DE-SAC shall be 30 feet, and the required
FRONT YARD SETBACK from the street which does not contain the CUL-DE-SAC shall be 20 feet.
15 In instances where an existing structure on a neighboring lot is situated less than 7.5 feet from the shared
property line in the R-SF3 district, a larger SIDE YARD SETBACK shall be required in order to ensure a minimum
separation of at least 15 feet between structures. In the R-CL, R-TH and R-MF districts, no minimum SIDE YARD
shall be required; provided, a minimum separation distance of 15 feet shall be maintained between all buildings.
16 Front setbacks shall only apply along perimeter streets, not including interior streets within a DEVELOPMENT.
17 No REAR YARD shall be required; provided, a minimum SETBACK of 20 feet shall be required from the
DEVELOPMENT’s perimeter property boundary.
18 No minimum SIDE YARD shall be required; provided, a minimum separation distance of 25 feet shall be
maintained between all buildings.
19 No REAR YARD shall be required; provided, a minimum setback of 30 feet shall be required from the
development’s perimeter property boundary.
90
Town of Seabrook Island Development Standards Ordinance 43
91
Town of Seabrook Island Development Standards Ordinance 44
Section 5.4 CONSERVATION SUBDIVISIONS
A. Purpose. The purpose of this section is to encourage the voluntary preservation of OPEN
SPACE by permitting limited design flexibility for new residential DEVELOPMENT within
designated zoning districts. This section is intended to:
1. Provide for the permanent preservation of OPEN SPACE;
2. Permit flexibility of design in order to promote environmentally sensitive design and the
efficient use of land;
3. Preserve unique or sensitive natural resources such as groundwater, floodplains,
WETLANDS, streams, steep slopes, woodlands, and wildlife habitats;
4. Permit the clustering of dwellings and accessory structures, at densities consistent with
neighboring DEVELOPMENT, to reduce the amount of infrastructure, including paved
surfaces and utility easements, necessary for residential development;
5. Reduce erosion and sedimentation by minimizing land disturbance and removal of
vegetation in residential development; and
6. Conserve scenic views and reduce perceived density.
B. General Requirements.
1. Applicability. The CONSERVATION SUBDIVISION is an available option, though not a
requirement, for new residential DEVELOPMENT within the R-SF1 zoning district.
2. Size and ownership requirements. Any property which is proposed to be subdivided as a
CONSERVATION SUBDIVISION must contain a minimum of ten (10) contiguous acres of
HIGH GROUND. The land may be held in single and separate ownership or in multiple
ownership. If held in multiple ownership, the site shall be developed according to a single
plan with common authority and common responsibility.
3. Minimum OPEN SPACE required. To qualify as a CONSERVATION SUBDIVISION, at least
twenty-five percent (25%) of the developable HIGH GROUND shall be preserved as OPEN
SPACE pursuant to the provisions of this section.
C. Procedures.
1. Review and approval. All requests to develop a CONSERVATION SUBDIVISION shall be
reviewed and approved by the Planning Commission, pursuant to the requirements of this
section and those specified in Article 15.
2. Plan required. Any PERSON seeking to subdivide property as a CONSERVATION
SUBDIVISION shall prepare and submit an OPEN SPACE plan concurrent with the
application for a preliminary PLAT. The OPEN SPACE plan shall include the following:
a. Dedicated OPEN SPACE shall be shown on the preliminary PLAT and shall be labeled
to specify that the land is to be permanently dedicated as OPEN SPACE. For purposes
92
Town of Seabrook Island Development Standards Ordinance 45
of this section, credit shall be granted only for developable HIGH GROUND which is
dedicated as OPEN SPACE.
b. As a condition of approval, the applicant shall specify how the dedicated OPEN
SPACE shall be conveyed. The conveyance may be trough any of the following means,
subject to approval by the PLANNING COMMISSION:
i. Deeded in perpetuity to the TOWN, subject to prior approval by TOWN
COUNCIL;
ii. Reserved for common use or ownership of all property owners within the
DEVELOPMENT by covenants in the deeds approved by the TOWN attorney. A
final copy of the proposed covenants shall be submitted with the application for
final PLAT approval;
iii. Deeded in perpetuity to a private, non-profit, tax-exempt organization legally
constituted for conservation purposes under terms and conditions that ensure the
perpetual protection and management of the property for conservation purposes.
A copy of the proposed deed and relevant corporate documents of the land trust
shall be submitted with the application for final PLAT approval;
iv. Deeded to a property owner's association or REGIME within the DEVELOPMENT
upon terms and conditions approved by the TOWN attorney that will ensure the
continued use and management of the land for the intended purposes. If this
option is selected, the formation and incorporation by the applicant of one or
more appropriate property owners' associations or REGIMEs shall be required
prior to approval. A copy of the proposed property owner's deed and the by-laws
and other relevant documents of the property owner's association or REGIME shall
be submitted with the application for final PLAT approval. The following shall be
required if OPEN SPACE is to be dedicated to a property owners' association or
REGIME:
(a) Covenants providing for mandatory membership in the association/REGIME
and setting forth the owner's rights, interests, and privileges in the association
and the common land, must be included in the deed for each LOT or unit;
(b) The property owners' association or REGIME shall have the responsibility of
maintaining the OPEN SPACE and shall operate and maintain any recreational
facilities which may be provided within the OPEN SPACE;
(c) The association or REGIME shall have the authority to levy charges against all
property owners to defray the expenses connected with the operation and
MAINTENANCE of OPEN SPACE and recreational facilities; and
(d) The applicant shall maintain control of dedicated OPEN SPACE and be
responsible for its MAINTENANCE until DEVELOPMENT sufficient to support
the association or REGIME has taken place.
93
Town of Seabrook Island Development Standards Ordinance 46
3. OPEN SPACE to be dedicated to the TOWN shall have shape, dimension, character,
location, and topography to ensure appropriate access and usability, and to accomplish at
least two (2) of the following OPEN SPACE purposes:
a. natural resource conservation,
b. WETLAND and water course conservation,
c. selective forestry,
d. wildlife habitat,
e. recreation,
f. civic purposes, or
g. scenic preservation.
4. Dedicated OPEN SPACE features that are not dedicated to the TOWN may be open to
the public or restricted to the residents or property owners within the DEVELOPMENT.
5. All approved OPEN SPACE shall be dedicated in accordance with the provisions of
this section, and as approved by PLANNING COMMISSION, prior to commencing any
construction, regardless of whether or not the project will be completed in phases.
D. Spatial Requirements for CONSERVATION SUBDIVISIONS.
1. Standards. The following spatial requirements shall apply to all LOTs created on or after
July 1, 2022, within a duly authorized CONSERVATION SUBDIVISION:
Table 5-4. Spatial Requirements for CONSERVATION SUBDIVISION LOTs
Maximum
Density
The maximum NET DENSITY of any CONSERVATION SUBDIVISION
shall not exceed 0.6 dwelling units per acre, multiplied by the total
acreage of HIGH GROUND within the DEVELOPMENT. Any calculation
which results in a fraction shall be rounded down to the nearest whole
number.
Minimum LOT
AREA
65,340 sf (1.5 acre). The minimum LOT AREA specified herein may be
reduced by one percent (1%) for each one percent (1%) of HIGH
GROUND within the DEVELOPMENT which is dedicated as OPEN
SPACE; provided, the minimum LOT AREA shall not be less than 32,670
square feet (0.75 acre)
Minimum LOT
WIDTH
If min. LOT AREA is 43,560 sf (1 acre) or more 125
If min. LOT AREA is less than 43,560 sf (1 acre) 100
Minimum YARD
SETBACKS
If min. LOT AREA is 43,560 sf (1 acre) or more
Front 50
Side 25
Rear 50
If min. LOT AREA is less than 43,560 sf (1 acre)
Front 30
Side 15
Rear 25
Maximum LOT
COVERAGE (%)
If min. LOT AREA is 43,560 sf (1 acre) or more 35
If min. LOT AREA is less than 43,560 sf (1 acre) 30
94
Town of Seabrook Island Development Standards Ordinance 47
2. Other requirements. Except for those modifications expressly authorized herein, the
applicant shall comply with all other provisions of this ordinance, including, specifically, all
other requirements of Tables 5-3 and 5-3b, and all other applicable laws and regulations,
except those which are incompatible with the provisions contained herein.
Section 5.5 Site Development Regulations
In addition to the requirements of this article, all DEVELOPMENT in the Residential Districts shall
meet the applicable requirements as listed elsewhere in this ordinance:
A. General Provisions – Article 2
B. Overlay Districts – Article 8
B.C. CONDITIONAL USE Requirements – Article 9
C.D. Environmental Performance Standards – Article 10
D.E. Trees, Landscaping and BUFFERing – Article 11
E.F. Parking and Loading – Article 12
F.G. SIGNs – Article 13
G.H. Site Plan Review – Article 14
95
Town of Seabrook Island Development Standards Ordinance 48
Article 6: Support Districts
ARTICLE
6
Support Districts
Town of Seabrook Island
Development Standards Ordinance
96
Town of Seabrook Island Development Standards Ordinance 49
Section 6.1 Purpose
A. CF, Community Facilities District. It is the purpose of this district to provide suitable
locations for those facilities that generally comprise the public and quasi-public infrastructure
for the community.
B. LC, Limited Commercial District. This district is intended to provide a concentrated location
for various businesses of a type, scale, and character that are in harmony with the residential
nature of the Seabrook Island community and support the daily needs of its residents and
visitors.
Section 6.2 Schedule of Uses
BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the
following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs
in the districts indicated at the top of Table 6-2 may be used for the purposes denoted by the
following abbreviations:
A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right.
B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right,
provided the specific conditions related to that use, as found in Article 9 are met.
C. Specific Conditions. Indicates the relevant section outlining the specific requirements or
conditions applicable to the CONDITIONAL USE which must be satisfied, in addition to the
general criteria of Section 9.3.
Table 6-2 Schedule of Uses: Support Districts
USE
LC
CF Specific
Conditions
ACCESSORY USEs
ACCESSORY USEs and STRUCTUREs P P
Drive-in and drive-through facilities for automated
teller machines, banks, pharmacies, and similar uses
(not including DRIVE-THROUGH RESTAURANTs)
C Section 9.4 B
Outdoor display areas for RETAIL ESTABLISHMENTs C Section 9.4 J
Outdoor seating at eating/drinking establishments C Section 9.4 K
Outdoor storage facilities C Section 9.4 L
Entertainment, Hospitality, and Leisure
Boat docks, landings and launches P
Classroom and lecture facilities P
Community swimming pools P
Establishments serving alcoholic beverages C Section 9.4 D
Fitness club/health spa P
Greenways, boardwalks, and non-motorized
trails/pathways P P
Gymnasium and indoor recreation facilities P P
HOTELs P
MARINA C C Section 9.4 H
97
Town of Seabrook Island Development Standards Ordinance 50
Non-commercial community or neighborhood
activity uses such as, park/playground, swimming
pool, storage STRUCTUREs, and off-street parking
P
OPEN AIR RECREATION uses P Section 9.4 I
RESTAURANTs (not including DRIVE-THROUGH
facilities) P
Office
Banks, savings & loans, and similar financial
institutions P
Government offices P P
Medical, dental or chiropractic office, including
clinics and/or laboratory P
Offices, general and professional P
Veterinary offices and clinics C Section 9.4 R
RETAIL
Establishments, not exceeding 5,000 square feet,
selling goods at RETAIL within a fully enclosed
BUILDING
P
Establishments larger than 5,000 square feet but not
more than 10,000 square feet, selling goods at
RETAIL within a fully enclosed BUILDING
C Section 9.4 N
Services
Helipad C Section 9.4 E
KENNELs C Section 9.4 G
Government facilities, including storage and
MAINTENANCE facilities P P
PERSONAL SERVICEs P
Photographic studios P
PLACES OF PUBLIC WORSHIP P
RECREATIONAL VEHICLE storage C C Section 9.4 M
UTILITY substation or subinstallation C C Section 9.4 P
Water or wastewater treatment facilities C Section 9.4 S
Wireless communication antennas or towers C C Section 9.4 T
Other
Similar Uses C C Section 2.6 G
Section 6.3 Spatial Requirements
A. All LOTs and BUILDINGs shall meet the minimum area and width requirements of Table 6-3.
New LOTs shall not be created, except in conformance with these requirements.
Table 6-3. LOT and Width Requirements, Support Districts
Zoning District Minimum Area Minimum Width (ft.)
LC 15,000 80
CF 15,000 80
B. All STRUCTUREs and their placement on a LOT shall conform to the minimum dimensional
requirements listed in Table 6-3a.
98
Town of Seabrook Island Development Standards Ordinance 51
Table 6-3a. Dimensional Requirements, Support Districts
Zoning District Maximum BUILDING
HEIGHT (ft./stories)
Minimum Yard SETBACKs (ft.)
Front Side Rear Parking BUILDING
LC 36 20 30 15 30
CF 36 - 30 - -
Section 6.4 Site Development Regulations
In addition to the requirements of this article, all DEVELOPMENT in the LC and CF Districts shall
meet the applicable requirements as listed elsewhere in this ordinance:
A. General Provisions – Article 2
B. Overlay Districts – Article 8
B.C. CONDITIONAL USE Requirements – Article 9
C.D. Environmental Performance Standards – Article 10
20 Parking shall not be permitted within the required FRONT YARD.
99
Town of Seabrook Island Development Standards Ordinance 52
D.E. Trees, Landscaping and BUFFERing – Article 11
E.F. Parking and Loading – Article 12
F.G. SIGNs – Article 13
G.H. Site Plan Review – Article 14
100
Town of Seabrook Island Development Standards Ordinance 53
Article 7: Mixed Use Districts
ARTICLE
7
Mixed-Use Districts
Town of Seabrook Island
Development Standards Ordinance
101
Town of Seabrook Island Development Standards Ordinance 54
Section 7.1 PurposeMixed Use (MU) District
A. Purpose. The Mixed Use (MU) district is established for the purpose of offering a tool that
permits a combination of residential and non-RESIDENTIAL USEs within a cohesive integrated
DEVELOPMENT. A variety of housing types is encouraged at moderate densities, along with
complementary office, RETAIL, and service uses in scale with the character of the district and
surrounding area. Size limits are imposed to ensure that NONRESIDENTIAL USEs remain
appropriate to the district intent.
B. Schedule of Uses. BUILDINGs or land shall not be used; and BUILDINGs shall not be erected,
except for the following specified uses, unless otherwise provided for in this ordinance. Land
and/or BUILDINGs in the districts indicated at the top of Table 7-1 may be used for the
purposes denoted by the following abbreviations:
1. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right.
2. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right,
provided the specific conditions related to that use, as found in Article 9 are met.
3. Specific Conditions. Indicates the relevant section listing the requirements or conditions
applicable to the CONDITIONAL USE which must be satisfied, in addition to the general
criteria of Section 9.3.
Table 7-1 Schedule of Uses: Mixed-Use District
USE MU Specific
Conditions
ACCESSORY USEs
ACCESSORY USEs and STRUCTUREs P
Drive-in and drive-through facilities for automated
teller machines, banks, pharmacies, and similar uses
(not including DRIVE-THROUGH RESTAURANTs)
C Section 9.4 B
Outdoor display areas for RETAIL ESTABLISHMENTs C Section 9.4 J
Outdoor seating at eating/drinking establishments C Section 9.4 K
Outdoor storage facilities C Section 9.4 L
Agriculture and Conservation
Bulkhead and EROSION control devices P
Community gardens P
Open space preserves such as WETLANDs and
wildlife habitat refuge areas P
Entertainment, Hospitality, and Leisure
Boat docks, landings and launches P
Classroom and lecture facilities P
Establishments serving alcoholic beverages C Section 9.4 D
Fitness club/health spa P
Greenways, boardwalks, and non-motorized
trails/pathways P
Gymnasium and indoor recreation facilities P
HOTELs P
MARINA C Section 9.4 H
102
Town of Seabrook Island Development Standards Ordinance 55
Non-commercial community or neighborhood
activity uses such as, park/playground, swimming
pool, storage STRUCTUREs, and off-street parking
P
OPEN AIR RECREATION uses P Section 9.4 I
RESTAURANTs (not including DRIVE-THROUGH
facilities) P
Office
Banks, savings & loans, and similar financial
institutions P
Government offices P
Medical, dental or chiropractic office, including
clinics and/or laboratory P
Offices, general and professional P
Residential
DWELLINGS on upper floors above businesses C Section 9.4 C
HOME OCCUPATIONs C Section 9.4 F
SHORT-TERM RENTAL UNITs C Section 9.4 O
MULTI-FAMILY DWELLINGs P
SINGLE-FAMILY DWELLINGs P
TOWNHOMEs P
TWO-FAMILY DWELLINGs P
VACATION CLUB UNIT C Section 9.4 Q
RETAIL
Establishments, not exceeding 5,000 square feet,
selling goods at RETAIL within a fully enclosed
BUILDING
P
Establishments larger than 5,000 square feet but
not more than 10,000 square feet, selling goods at
RETAIL within a fully enclosed BUILDING
C Section 9.4 N
Services
Government facilities, including storage and
MAINTENANCE facilities P
PERSONAL SERVICEs P
Photographic studios P
PLACES OF PUBLIC WORSHIP P
UTILITY substation or subinstallation C Section 9.4 P
Wireless communication antennas or towers C Section 9.4 T
Other
Similar Uses C Section 2.6 G
C. Spatial Requirements
1. Area and Density. All LOTs and BUILDINGs shall meet the minimum area and width
requirements of Table 7-1a. New LOTs shall not be created, except in conformance with
these requirements.
103
Town of Seabrook Island Development Standards Ordinance 56
Table 7-1a. LOT AREA, Width, and Density Requirements, Mixed-Use District
Zoning
District
Size
Area Occupied by
Non-RESIDENTIAL
USES (%) Min.
Width (ft.)
Density
(max.
units/ NET
Resid.
ACRE
Project
Area
(acres)
Minimum
Min.
OPEN
SPACE
(%)
Minimum Maximum
MU 5 20 20 50 200 15
2. Density Bonus. A residential density bonus over and above the density otherwise allowed
in the mixed-use district may be approved by TOWN COUNCIL provided the applicant
increases the percentage of the total project area dedicated for OPEN SPACE. This bonus
may be granted only if specifically requested by the applicant. Such bonus shall consist of
an additional one (1) unit per NET ACRE of allowable density for every additional five (5)
percent of HIGH GROUND land area devoted to dedicated OPEN SPACE beyond the
minimum requirement; provided, the maximum bonus shall not exceed an additional five
(5) units per NET ACRE.
3. SETBACKs. All STRUCTUREs and their placement on a LOT shall conform to the minimum
dimensional requirements listed in Table 7-1b.
Table 7-1b. Dimensional Requirements, Mixed-Use District
Zoning
District
Maximum
BUILDING HEIGHT
(ft./stories)
Minimum Yard SETBACKs (ft.)21
Front Side Rear Parking BUILDING
MU 36 20 20 20 40
4. OPEN SPACE. Dedicated OPEN SPACE shall be provided in accordance with the following
standards:
a. A minimum 20 percent of the gross land area, as specified in Table 7-1, shall be
dedicated OPEN SPACE.
b. Dedicated OPEN SPACE shall be shown on the concept plan and preliminary PLAT, if
applicable, and shall be labeled to specify that the land is to be dedicated for OPEN
SPACE purposes. The OPEN SPACE land is to be permanently reserved for OPEN
SPACE purposes. The applicant shall convey the dedicated OPEN SPACE as a
condition of approval through any of the following means, as approved by the TOWN
COUNCIL:
i. Deeded in perpetuity to the TOWN;
ii. Reserved for common use or ownership of all property owners within the
DEVELOPMENT by covenants in the deeds approved by the TOWN attorney. A
21 Setbacks apply to the perimeter boundary of the project area. Individual setbacks within the mixed-use
development shall be determined during the development plan review process, based on the setback
requirements for the zoning district corresponding with the proposed use.
104
Town of Seabrook Island Development Standards Ordinance 57
copy of the proposed covenants shall be submitted with the application for final
site plan approval;
iii. Deeded in perpetuity to a private, non-profit, tax-exempt organization legally
constituted for conservation purposes under terms and conditions that ensure the
perpetual protection and management of the property for conservation purposes.
A copy of the proposed deed and relevant corporate documents of the land trust
shall be submitted with the final site plan application;
iv. Deeded to a property owner's association or REGIME within the DEVELOPMENT
upon terms and conditions approved by the TOWN attorney that will ensure the
continued use and management of the land for the intended purposes. If this
option is selected, the formation and incorporation by the applicant of one or
more appropriate property owners' associations or REGIMEs shall be required
prior to approval. A copy of the proposed property owner's deed and the by-laws
and other relevant documents of the property owner's association or REGIME shall
be submitted with the final site plan application. The following shall be required if
OPEN SPACE is to be dedicated to a property owners' association or REGIME:
(a) Covenants providing for mandatory membership in the association/REGIME
and setting forth the owner's rights, interests, and privileges in the association
and the common land, must be included in the deed for each LOT or unit;
(b) The property owners' association or REGIME shall have the responsibility of
maintaining the OPEN SPACE and shall operate and maintain any recreational
facilities which may be provided within the OPEN SPACE;
(c) The association or REGIME shall have the authority to levy charges against all
property owners to defray the expenses connected with the operation and
MAINTENANCE of OPEN SPACE and recreational facilities; and
(d) The applicant shall maintain control of dedicated OPEN SPACE and be
responsible for its MAINTENANCE until DEVELOPMENT sufficient to support
the association or REGIME has taken place.
c. OPEN SPACE to be dedicated to the TOWN shall have shape, dimension, character,
location, and topography to ensure appropriate public access and usability, and to
accomplish at least two (2) of the following OPEN SPACE purposes:
i. natural resource conservation,
ii. WETLAND and water course conservation,
iii. selective forestry,
iv. wildlife habitat,
v. recreation,
vi. civic purposes, or
105
Town of Seabrook Island Development Standards Ordinance 58
vii. scenic preservation.
d. Dedicated OPEN SPACE features that are not dedicated to the TOWN may be open to
the general public or restricted to the residents or property owners within the
DEVELOPMENT.
e. Streets, sidewalks, PARKING LOTs and other IMPERVIOUS SURFACEs shall be
excluded from the calculation of required OPEN SPACE. However, lands occupied by
bike paths, tennis courts, or similar common recreational amenities may be counted as
dedicated OPEN SPACE; provided, such IMPERVIOUS SURFACEs shall not constitute
more than 10 percent of the total required OPEN SPACE.
f. Up to 50 percent of the dedicated OPEN SPACE requirement may be satisfied with
land covered by water or by stormwater detention or retention basins if the TOWN
determines that such a water body or basin constitutes an amenity that contributes to
the character of the mixed-use DEVELOPMENT and offers an active or passive leisure
experience.
g. At least 50 percent of the dedicated OPEN SPACE within a mixed-use DEVELOPMENT
shall be usable for active and passive recreation including, but not limited to, walking,
biking, playfields, picnicking, playgrounds, relaxation, and boating.
h. The dedicated OPEN SPACE shall not be included in SUBDIVISION LOTs designated
for DEVELOPMENT or in LOT size calculations.
i. All approved OPEN SPACE shall be dedicated in accordance with the provisions of
this section and as approved by TOWN COUNCIL prior to commencing any
construction, regardless of whether or not the project will be completed in phases.
D. Review Procedures. All requests for approval of a mixed-use zoning district shall be subject
to the review and approval procedures of this section. Mixed-use zoning may be established
on any property at the initiation of the TOWN or by rezoning application submitted by the
property owner. If initiated by the TOWN, DEVELOPMENT of the property shall be subject to
review and approval of concept and final DEVELOPMENT plans, in accordance with the
applicable provisions of this section.
1. Approval Authority.
a. The ZONING ADMINISTRATOR and PLANNING COMMISSION shall have review and
recommendation authority for the concept plan.
b. The TOWN COUNCIL shall have final approval authority for the concept plan.
c. The ZONING ADMINISTRATOR shall have approval authority for a final plan/site-
specific plan where no major changes to the approved concept plan, as defined in
Article 14.8, are required.
2. Pre-application Review.
106
Town of Seabrook Island Development Standards Ordinance 59
a. All applicants seeking mixed-use zoning approval shall schedule a pre-application
conference with the ZONING ADMINISTRATOR to discuss the proposed
DEVELOPMENT prior to applying. The ZONING ADMINISTRATOR may include
representatives from any outside agency, department, entity, or consultant as he or
she deems appropriate. At the pre-application conference, the ZONING
ADMINISTRATOR shall review a proposed sketch plan.
b. At minimum, the sketch plan shall contain the following information:
i. Location map of the proposed site;
ii. General description of proposed land uses, including approximate location and
acreage; and
iii. Proposed GROSS DENSITY of the DEVELOPMENT, type of dwellings proposed,
proposed GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and
activities and NET DENSITY of individual areas or parcels within the
DEVELOPMENT.
c. A narrative description shall also accompany the sketch plan. The narrative shall
describe how the proposed mixed-use zoning and uses relate to the goals and
recommendations of the TOWN’s COMPREHENSIVE PLAN. The narrative shall also
describe any anticipated inconsistencies between the proposed DEVELOPMENT and
the provisions of this article.
d. The ZONING ADMINISTRATOR shall review the sketch plan and narrative and advise
the applicant regarding conformance or inconsistencies with the requirements of this
article and any modifications that may be required to comply with the ordinance.
Once the pre-application process is complete, if the applicant wishes to proceed with
the zoning application, a concept plan of the entire mixed-use DEVELOPMENT shall
be prepared and submitted with a formal application.
3. Concept Plan.
a. Application requirements.
i. A complete application shall be filed on a form provided by the ZONING
ADMINISTRATOR, along with the application fee, a concept plan meeting all
requirements of this section, and any DEVELOPMENT conditions proposed by the
applicant. Incomplete applications or concept plans shall be returned to the
applicant without further processing.
ii. Unless specifically modified by DEVELOPMENT conditions accepted by the TOWN
COUNCIL, a mixed-use DEVELOPMENT shall comply with all regulations in effect
at the time of rezoning approval.
iii. The mixture of uses shall be limited to those specified in Table 7-1.
107
Town of Seabrook Island Development Standards Ordinance 60
b. Concept plan requirements. At minimum, the concept plan shall contain the following
information in schematic form, unless specifically waived by the ZONING
ADMINISTRATOR:
i. A title, giving the names of the developers and property owners, the date, scale,
and the PERSON or firm preparing the plan.
ii. A vicinity map and north arrow.
iii. The location and size of the project site, including the total GROSS ACREAGE and
total HIGH GROUND
iv. The current zoning of the subject property and surrounding properties.
v. The landowners and general land use of adjoining properties.
vi. Location of proposed uses assigned to sub-areas.
vii. A tabulation of total DWELLING UNITs and gross residential densities and the
GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and activities.
viii. Location of existing FLOOD zones, CRITICAL AREAS, WATERBODIES, WETLANDS,
and other riparian areas, and significant environmental features.
ix. General layout of transportation routes including streets and major pedestrian
ways.
x. The location of existing infrastructure (examples include roadways, sidewalks, and
proximity of nearest water and/or sewer mains).
xi. Conceptual location for any proposed public uses including schools, parks, fire,
and medical emergency services, etc.
xii. General areas to be designated for common OPEN SPACE.
xiii. Tree survey, if applicable, in accordance with Section 11.5 B.
xiv. A TRAFFIC IMPACT ANALYSIS shall be required. The analysis must be prepared by
a professional transportation engineer with expertise in the preparation of
TRAFFIC IMPACT ANALYSES and shall follow the requirements of Section 8.4.
xv. A phasing plan, if applicable.
c. Review and approval.
i. Staff review.
(a) Upon receipt of a complete mixed-use DEVELOPMENT application, the
ZONING ADMINISTRATOR shall distribute the application materials to the
108
Town of Seabrook Island Development Standards Ordinance 61
appropriate TOWN staff, as well as representatives from any outside agency,
department, entity, or consultant as he or she deems appropriate.
(b) The ZONING ADMINISTRATOR shall prepare a staff report based on the
comments provided by other reviewers. The report and recommendations
shall be forwarded to the PLANNING COMMISSION for review and
recommendation.
(c) The ZONING ADMINISTRATOR shall provide notice as required by Section
19.2 and schedule consideration of the mixed-use application on the next
available PLANNING COMMISSION agenda. The ZONING ADMINISTRATOR
will then inform the applicant/agent when the request will appear on the
PLANNING COMMISSION agenda for action on the application. The applicant
or authorized representative must be present at the meeting or the matter will
not be heard.
ii. Optional joint work session. The applicant may request a joint work session with
the TOWN COUNCIL and PLANNING COMMISSION to provide an opportunity to
present the application and respond to any initial questions that members may
have regarding the proposed DEVELOPMENT.
(a) If the request is granted, the ZONING ADMINISTRATOR shall schedule the
joint work session and notify the applicant when the session will occur.
(b) No decision or final action may be taken at a joint work session.
iii. PLANNING COMMISSION review and recommendation.
(a) The ZONING ADMINISTRATOR shall present the staff report to the PLANNING
COMMISSION.
(b) After allowing time for presentation from the applicant and public comments, if
any, the PLANNING COMMISSION shall consider the application for
conformance with the requirements of this ordinance and the review criteria in
Section 7.5.
(c) The PLANNING COMMISSION shall then make a recommendation to the
TOWN COUNCIL to approve or deny the application.
iv. TOWN COUNCIL hearing and final decision.
(a) The staff report and PLANNING COMMISSION recommendations shall be
forwarded to the TOWN COUNCIL for review and final decision.
(b) The ZONING ADMINISTRATOR shall provide notice, as required by Section
19.2 C, for a public hearing and schedule the mixed-use application on the
next available TOWN COUNCIL agenda.
(c) The ZONING ADMINISTRATOR shall present the staff report and PLANNING
COMMISSION recommendation.
109
Town of Seabrook Island Development Standards Ordinance 62
(d) After allowing time for presentation from the applicant and holding the
required public hearing, the TOWN COUNCIL shall consider the application
for conformance with the requirements of this ordinance and the review
criteria in Section 7.5.
(e) Following the rezoning procedures, as specified in Section 19.2, the TOWN
COUNCIL shall approve, deny, or refer the application back to the PLANNING
COMMISSION for further consideration.
d. DEVELOPMENT conditions. The applicant may offer conditions to be attached to the
rezoning. Proposed conditions shall be submitted as part of the application and
concept plan.
i. Conditions may be more restrictive than the requirements of this article but shall
not alter the intent of the applicable mixed-use district nor permit uses not
otherwise authorized by Table 7-1.
ii. The conditions shall be described in writing.
iii. The DEVELOPMENT conditions shall be binding upon the property, unless
amended in conformance with the requirements of this section. Upon approval of
the rezoning application, the approved DEVELOPMENT conditions shall be
recorded in the Register of Deeds Office.
iv. If phasing is proposed, the applicant shall provide a general breakdown showing
the various phases and the estimated schedule of construction.
4. Final Plan or Site-Specific Plan.
a. Phasing. The mixed-use DEVELOPMENT may be completed in multiple phases. If the
DEVELOPMENT is to be completed in a single phase, the applicant shall prepare and
submit a final development plan. If the DEVELOPMENT is to be completed in more
than one phase, the applicant shall prepare and submit a site-specific plan prior to
construction of each phase of the project. In either case, the final plan/site-specific
plan shall contain the elements required in Section 14.5 for final development plans
and conform to the previously approved concept plan.
b. Timing. An application for approval of the final plan for the mixed-use DEVELOPMENT
or a site-specific plan for the initial phase(s) shall be submitted to the ZONING
ADMINISTRATOR within 12 months of the date of TOWN COUNCIL’s approval of the
concept plan and rezoning.
c. ZONING ADMINISTRATOR review and approval.
i. The ZONING ADMINISTRATOR shall distribute the final plan/site-specific plan
application to the appropriate TOWN staff, as well as representatives from any
outside agency, department, entity, or consultant as he or she deems appropriate.
110
Town of Seabrook Island Development Standards Ordinance 63
ii. Once the plan has been received and reviewed by the appropriate reviewers and
the applicant has met all of the required elements of this ordinance, any other
applicable regulations, and the approved concept plan and DEVELOPMENT
conditions, the ZONING ADMINISTRATOR shall issue a final approval.
iii. If the plan is inconsistent in any aspect with the approved concept plan, the
ZONING ADMINISTRATOR shall follow the procedure specified in this section for
amending an approved plan.
5. Amendments. Any and all amendments to the concept plan, development conditions
and/or final/site-specific plans for the mixed-use shall be subject to the following review
procedures:
a. The ZONING ADMINISTRATOR shall have the authority to approve:
i. Changes which result in a decrease in approved density or BUILDING size, either
residential or non-residential.
ii. Change in land use designation from MULTI-FAMILY, TWO-FAMILY, or
TOWNHOME to SINGLE-FAMILY or a change from any other use to OPEN
SPACE/passive recreation; provided, the minimum required proportion of non-
RESIDENTIAL USEs shall be retained.
iii. Change in infrastructure features (i.e., roads/access, sewer, water, storm drainage)
internal to the mixed-use area which are clearly beneficial to the occupants of the
mixed-use area and will have no impact on adjoining or off-site properties.
iv. Movement of BUILDINGs within the same general vicinity as shown on the
approved plan.
v. Internal rearrangement of a PARKING LOT that does not affect the number of
PARKING SPACEs or alter access locations or design.
b. All other changes shall be considered as a new application and processed in
accordance with the provisions of Section 7.4 C and D.
E. Development Review Criteria. Applications for mixed-use DEVELOPMENT shall only be
approved upon a finding of compliance with the following criteria:
1. Rezoning Criteria. The criteria of Article 19.3 B for rezonings shall be satisfied.
2. Development Plan Standards. The standards of Section 14.6 for development plans shall
be satisfied.
3. Consistency with COMPREHENSIVE PLAN. All mixed-use DEVELOPMENT shall be
designed, constructed, and maintained in conformance with the applicable guidelines
and standards established by the TOWN’s COMPREHENSIVE PLAN.
4. Integration with Transportation System. Mixed-use DEVELOPMENTs shall be designed to
integrate into the adjacent transportation system relative to:
111
Town of Seabrook Island Development Standards Ordinance 64
a. Pedestrian connections to ensure accessibility to current or future DEVELOPMENT, if
applicable;
b. Connectivity to existing and future roadways, sidewalks, and pathways;
c. Complete streets roadway design that accommodates vehicular, pedestrian, and
bicycle transportation modes;
d. Strategic locations of PARKING LOTs and STRUCTUREs to facilitate shared parking;
and
e. Access management to provide internal connections between uses and minimize
individual driveway access to perimeter roads.
5. Impact on Infrastructure. The DEVELOPMENT is staged in a manner that allows for and
facilitates the timely provision of public utilities, facilities, and services.
6. Compatibility of Uses and STRUCTUREs. The mixed-use DEVELOPMENT is planned so
land uses and densities create an appropriate transition to existing or planned uses and
densities on adjoining properties.
7. DEVELOPMENT Balance. If constructed in phases, each phase shall include a mixture of
residential types and/or residential and non-RESIDENTIAL USEs to ensure that each phase
contributes to the mixed-use concept.
8. General Site Design: The following characteristics shall be incorporated into the mixed-
use DEVELOPMENT:
a. Pedestrian accessibility/concentration of DEVELOPMENT (critical mass) in a compact,
walkable area.
i. Uses are concentrated to promote convenient pedestrian access.
ii. Pedestrian circulation is clearly defined and connects all uses.
iii. Bicycle and pedestrian access are provided to adjacent DEVELOPMENTs.
iv. Sidewalks are provided on each side of rights-of-way or PRIVATE STREETs
throughout the DEVELOPMENT.
v. Strip commercial DEVELOPMENT characterized by single story uncoordinated,
unconnected BUILDINGs with large street FRONTAGE PARKING LOTs is
specifically prohibited. Strip malls with uncoordinated, unconnected out-parcels
are prohibited. All STRUCTUREs are fully integrated into the mixed-use project
through common design themes (including, but not limited to, lighting, benches,
landscaping, other decorative features but not necessarily BUILDING design),
integration with a variety of uses, nonlinear arrangement, common spaces,
pedestrian walkways, vehicular access connections, and other features.
112
Town of Seabrook Island Development Standards Ordinance 65
b. Plazas, courtyards, and other common areas are provided for public gathering and
interaction. Amenities, such as benches, planters, lighting, fountains, art, and
landscaping that further the design theme of the project and encourage interaction
shall be provided.
c. Mixed-use projects require special attention to BUILDING design because of the
relationship of land uses in close proximity. Functional integration of residential and
commercial uses shall be considered during design of mixed-use projects. The
following standards are intended to guide DEVELOPMENT of mixed-use projects:
i. The mixed-use DEVELOPMENT shall be designed and developed to provide an
appropriate interrelationship between the various uses and STRUCTUREs within
the DEVELOPMENT through the use of complementary materials, unified
streetscape treatment, BUFFERing, connectivity for vehicular and pedestrian
movement, BUILDING orientation, parking location and height transition.
ii. Residential and commercial uses may be located within the same or adjoining
STRUCTUREs, provided applicable health and safety regulations are followed.
iii. STRUCTUREs shall provide architectural relief and interest, with emphasis at
BUILDING entrances and along sidewalks, to promote and enhance a comfortable
pedestrian scale and orientation. STRUCTUREs shall have consistent scale and
massing to create a unified project. Compatibility with the immediate context is
required. However, gradual transitions in scale and massing are permitted.
(a) Blank walls shall be avoided by including ground floor windows, recesses,
extensions and breaks in roof elevation.
(b) Design shall provide differentiation between ground level spaces and upper
stories. For example, bays or balconies for upper levels, and awnings,
canopies, or other similar treatments for lower levels can provide
differentiation. Variation in BUILDING materials, trim, paint, ornamentation,
windows, or other features such as public art, may also be used.
(c) Design shall ensure privacy in residential sectors through effective window
placement, soundproofing, landscape screening, or orientation of outdoor
living areas (e.g., balconies, PORCHes, and PATIOs). Opposite facing windows
at close distances should be offset vertically or horizontally or employ
appropriate materials (e.g., glazed or tinted) to protect privacy.
d. Residential uses and diversity of housing types may be required.
i. Subject to approval by TOWN COUNCIL, a mixed use development may be
required to incorporate one or more types of residential uses (SINGLE-FAMILY,
MULTI-FAMILY, TOWNHOME, cluster, or TWO-FAMILY) at densities not to exceed
those permitted within the MU district, where recommended by the PLANNING
COMMISSION to comply with the recommendations of the TOWN’s
COMPREHENSIVE PLAN.
113
Town of Seabrook Island Development Standards Ordinance 66
ii. Where incorporated into the mixed-use DEVELOPMENT, SINGLE-FAMILY LOT
sizes shall be varied to provide a mixture of LOT sizes.
iii. Minimum LIVABLE FLOOR AREA requirement for SINGLE-FAMILY detached units
shall be 850 sq. ft. All other residential types shall adhere to area per number of
bedrooms, as listed in the Residential District Table 5-3c.
e. Permitted flexibility in LOT sizes, SETBACKs, street widths and landscaping shall result
in a more livable DEVELOPMENT, preservation of natural features, and creation of
OPEN SPACE consistent with the policies of the COMPREHENSIVE PLAN and this
ordinance.
F. Timing. Approval of the final plan or site-specific plan shall be vested in accordance with the
provisions of Section 1.6 B. of this ordinance.
G. Site Development Regulations. In addition to the requirements of this article, all
DEVELOPMENT in the Mixed-Use District shall meet the applicable requirements as listed
elsewhere in this ordinance:
1. General Provisions – Article 2
2. Overlay Districts – Article 8
3. CONDITIONAL USE Requirements – Article 9
4. Environmental Performance Standards – Article 10
5. Trees, Landscaping and BUFFERing – Article 11
6. Parking and Loading – Article 12
7. SIGNs – Article 13
8. Site Plan Review – Article 14
Section 7.2 Planned Development (PD) District
A. Purpose. The Planned Development (PD) district is established to:
1. Allow for a coordinated and compatible mix of land USEs, where appropriate, in a manner
consistent with the TOWN’s COMPREHENSIVE PLAN;
2. Encourage innovative site planning, architectural design, and DEVELOPMENT flexibility
that cannot be achieved under conventional zoning districts;
3. Enhance the quality, functionality, and overall character of new mixed-USE
DEVELOPMENTs;
4. Ensure high-quality DEVELOPMENT through a UNIFIED DEVELOPMENT PLAN that
establishes clear, enforceable, and site-specific standards and conditions;
114
Town of Seabrook Island Development Standards Ordinance 67
5. Protect and preserve environmentally sensitive areas, OPEN SPACEs, historic resources,
and the established character of the community;
6. Promote the efficient and coordinated use of land and public infrastructure, including
transportation systems, utilities, stormwater systems, and public services; and
7. Provide a clear, predictable, and equitable regulatory framework that balances
DEVELOPMENT flexibility with the protection of public health, safety, and general welfare.
B. Applicability. A PD district may be established for any parcel, or combination of contiguous
parcels, by rezoning in accordance with the procedures, standards, and criteria set forth in this
section. PD districts are intended to accommodate mixed-USE DEVELOPMENTs containing
one or more of the following:
1. Residential DWELLINGs of varying types and densities, together with compatible
commercial USES;
2. BUSINESS CENTERS, shopping centers, and similar multi-tenant commercial
DEVELOPMENTs;
3. Office parks and professional or campus-style office DEVELOPMENTs; and
4. Any other mixture of two or more USEs deemed acceptable by TOWN COUNCIL.
C. Minimum Area. To be eligible for rezoning as a PD district, a parcel, or combination of
contiguous parcels, shall contain a minimum of five (5) acres of HIGH GROUND.
D. UNIFIED DEVELOPMENT PLAN. Each PD district is anticipated to be unique and shall be
subject to a site-specific UNIFIED DEVELOPMENT PLAN, which shall be adopted concurrently
with rezoning approval. The UNIFIED DEVELOPMENT PLAN shall consist of two components:
the PD district map and PD district text.
1. PD District Map. Each PD district shall include a map depicting the general layout of the
proposed DEVELOPMENT and the permitted location(s) of authorized land USEs. Upon
adoption by TOWN COUNCIL, the PD district map shall become the official zoning district
map for the subject property.
2. PD District Text. The PD district text shall expressly enumerate the allowable USEs and
applicable DEVELOPMENT standards for the PD district. Upon adoption by TOWN
COUNCIL, the PD district text shall constitute the official zoning ordinance text governing
the USE and DEVELOPMENT of the subject property.
a. General Requirements.
i. The PD district shall demonstrate innovative site planning for a coordinated
mixture of USEs, as reflected in the PD district map.
ii. Overall site design shall be harmonious with respect to landscaping; the
placement and enclosure of PRINCIPAL and ACCESSORY USEs; BUILDING size,
115
Town of Seabrook Island Development Standards Ordinance 68
height and orientation; street patterns; vehicular and pedestrian connectivity; and
relationships among USEs. Variety in BUILDING types, BUILDING HEIGHTs,
façades, SETBACKS, and the size and location of OPEN SPACEs is encouraged.
b. PERMITTED and CONDITIONAL USEs.
i. Each PD district shall contain a list of PERMITTED and CONDITIONAL USEs
authorized within the district. Only USEs expressly authorized in the PD district text
shall be permitted. All other uses shall be prohibited.
ii. Any USE proposed by an applicant and approved by TOWN COUNCIL may be
authorized in the PD district text, including USEs not expressly listed in Appendix
B: Consolidated Table of USEs.
iii. When necessary to mitigate potential adverse impacts – including, but not limited
to, traffic, noise, hours of operation, and similar factors – or to protect the public
health, safety, and general welfare, the TOWN COUNCIL may impose reasonable
conditions, limitations, or additional requirements on any authorized USE. Such
conditions shall be in addition to all other standards otherwise applicable to the
authorized USE.
c. Required DEVELOPMENT Standards. The DEVELOPMENT standards identified in
Table 7-2 shall be established in the PD district text, as applicable. If a specific
DEVELOPMENT standard is not expressly identified in the PD district text, the
corresponding standard of the RSF-1 district shall apply.
Table 7-2. Required DEVELOPMENT Standards
Category Standard to be Enumerated in PD District Text
Residential
Density
Maximum Number of DWELLING UNITs (By DWELLING Type)
Maximum Number of DWELLING UNITs (Total Project)
Maximum DENSITY (DWELLING UNITS Per NET ACREAGE)
Non-Residential
Density
Maximum USABLE FLOOR AREA (Per BUILDING or USE Type)
Maximum USABLE FLOOR AREA (Total Project)
REQUIRED
SETBACKS
Minimum FRONT YARD SETBACK
Minimum SIDE YARD SETBACK
Minimum REAR YARD SETBACK
Minimum BUILDING Separation (For Multiple BUILDINGs on
the Same LOT)
BUFFERs Minimum BUFFER Width
BUFFER Zone Specifications and Standards
BUILDING Design
Standards
Maximum BUILDING HEIGHT
Minimum LIVABLE FLOOR AREA (By DWELLING Type)
LOT AREA &
WIDTH
Minimum LOT AREA
Minimum LOT WIDTH
LOT COVERAGE Maximum LOT COVERAGE (Per LOT)
Maximum LOT COVERAGE (Total Project)
OPEN SPACE
Minimum OPEN SPACE Required (Total Project)
OPEN SPACE Design Standards
OPEN SPACE Conveyance & Management Plan
116
Town of Seabrook Island Development Standards Ordinance 69
Phasing Project Phasing Plan (If Applicable)
d. Other DEVELOPMENT Standards. The PD district text may provide for variations from
other DEVELOPMENT standards to allow flexibility in the arrangement of USEs and to
promote and protect the public health, safety, and general welfare. Except as
expressly modified in the PD district text, all DEVELOPMENT within a PD district shall
comply with all other applicable requirements of this ordinance, including:
i. General Provisions – Article 2
ii. Overlay Districts – Article 8
iii. CONDITIONAL USE Requirements – Article 9
iv. Environmental Performance Standards – Article 10
v. Trees, Landscaping and BUFFERing – Article 11
vi. Parking and Loading – Article 12
vii. SIGNs – Article 13
viii. Site Plan Review – Article 14
E. Adoption; Effect.
1. Rezoning Required. Establishment of a PD district shall require approval of a rezoning
ordinance by TOWN COUNCIL.
2. Application. In addition to the requirements set forth in Section 19.2 A, each application to
establish a PD district shall be accompanied by a proposed UNIFIED DEVELOPMENT
PLAN consisting of a PD district map and PD district text.
3. Review Procedure. Applications to establish a PD district shall be processed as map
amendments in accordance with the procedures set forth in Section 19.2.
4. Criteria for Review. Applications to establish a PD district shall be evaluated using the map
amendment criteria set forth in Sections 19.3 B, C and D.
5. Binding Effect. Upon adoption, the approved PD ordinance and UNIFIED DEVELOPMENT
PLAN shall be binding upon the subject property, and all future development shall
conform thereto. Any substantial deviation shall require amendment of the PD ordinance
in accordance with subsection F.
6. Enforcement. The TOWN may enforce the provisions of a PD district using all remedies
authorized by law.
F. Amendments.
117
Town of Seabrook Island Development Standards Ordinance 70
1. Major Amendments. Major amendments to a PD district shall require adoption of an
ordinance of TOWN COUNCIL following review and recommendation by the PLANNING
COMMISSION. Major amendments constitute zoning ordinance amendments and shall be
processed as follows:
a. Amendments to the PD district map shall be processed as map amendments in
accordance with Section 19.2 and evaluated using the criteria set forth in Sections 19.3
A, C and D.
b. Amendments to the PD district text shall be processed as text amendments in
accordance with Section 19.2 and evaluated using the criteria set forth in Sections 19.3
B, C and D.
2. Minor Amendments. The PD district text may authorize a procedure for the review and
approval of minor amendments to the UNIFIED DEVELOPMENT PLAN. When expressly
authorized in the PD district text, the ZONING ADMINISTRATOR may approve minor
amendments subject to any conditions or limitations imposed by TOWN COUNCIL. Any
amendment which is not expressly authorized in the PD district text as a minor
amendment shall be treated as a major amendment.
G. Approved PD Districts.
1. Adopted. The PD districts listed in Table 7-2a are hereby adopted by reference as if fully
set forth in this ordinance:
Table 7-2a. Adopted PD Districts
PD # PD Name Adopted Amended
Ordinance Date Ordinance Date
[RESERVED]
2. Records. Copies of all PD district ordinances and amendments thereto shall be maintained
on file in the office of the ZONING ADMINISTRATOR.
MU, Mixed-Use District. This district is established for the purpose of offering a tool that permits
a combination of residential and non-RESIDENTIAL USEs within a cohesive integrated
DEVELOPMENT. A variety of housing types is encouraged at moderate densities, along with
complementary office, RETAIL, and service uses in scale with the character of the district and
surrounding area. Size limits are imposed to ensure that NONRESIDENTIAL USEs remain
appropriate to the district intent.
Section 7.2 Schedule of Uses
BUILDINGs or land shall not be used; and BUILDINGs shall not be erected, except for the
following specified uses, unless otherwise provided for in this ordinance. Land and/or BUILDINGs
in the districts indicated at the top of Table 7-2 may be used for the purposes denoted by the
following abbreviations:
A. PERMITTED USE (P). Land and/or BUILDINGs in this district may be used by right.
118
Town of Seabrook Island Development Standards Ordinance 71
B. CONDITIONAL USE (C). Land and/or BUILDINGs in this district may be used by right,
provided the specific conditions related to that use, as found in Article 9 are met.
C. Specific Conditions. Indicates the relevant section listing the requirements or conditions
applicable to the CONDITIONAL USE which must be satisfied, in addition to the general
criteria of Section 9.3.
Table 7-2 Schedule of Uses: Mixed-Use District
USE
MU
Specific Conditions
ACCESSORY USEs
ACCESSORY USEs and STRUCTUREs P
Drive-in and drive-through facilities for automated
teller machines, banks, pharmacies, and similar uses
(not including DRIVE-THROUGH RESTAURANTs)
C Section 9.4 B
Outdoor display areas for RETAIL ESTABLISHMENTs C Section 9.4 J
Outdoor seating at eating/drinking establishments C Section 9.4 K
Outdoor storage facilities C Section 9.4 L
Agriculture and Conservation
Bulkhead and EROSION control devices P
Community gardens P
Open space preserves such as WETLANDs and wildlife
habitat refuge areas P
Entertainment, Hospitality, and Leisure
Boat docks, landings and launches P
Classroom and lecture facilities P
Establishments serving alcoholic beverages C Section 9.4 D
Fitness club/health spa P
Greenways, boardwalks, and non-motorized
trails/pathways P
Gymnasium and indoor recreation facilities P
HOTELs P
MARINA C Section 9.4 H
Non-commercial community or neighborhood activity
uses such as, park/playground, swimming pool,
storage STRUCTUREs, and off-street parking
P
OPEN AIR RECREATION uses P Section 9.4 I
RESTAURANTs (not including DRIVE-THROUGH
facilities) P
Office
Banks, savings & loans, and similar financial institutions P
Government offices P
Medical, dental or chiropractic office, including clinics
and/or laboratory P
Offices, general and professional P
Residential
DWELLINGS on upper floors above businesses C Section 9.4 C
HOME OCCUPATIONs C Section 9.4 F
SHORT-TERM RENTAL UNITs C Section 9.4 O
MULTI-FAMILY DWELLINGs P
SINGLE-FAMILY DWELLINGs P
119
Town of Seabrook Island Development Standards Ordinance 72
TOWNHOMEs P
TWO-FAMILY DWELLINGs P
VACATION CLUB UNIT C Section 9.4 Q
RETAIL
Establishments, not exceeding 5,000 square feet,
selling goods at RETAIL within a fully enclosed
BUILDING
P
Establishments larger than 5,000 square feet but not
more than 10,000 square feet, selling goods at RETAIL
within a fully enclosed BUILDING
C Section 9.4 N
Services
Government facilities, including storage and
MAINTENANCE facilities P
PERSONAL SERVICEs P
Photographic studios P
PLACES OF PUBLIC WORSHIP P
UTILITY substation or subinstallation C Section 9.4 P
Wireless communication antennas or towers C Section 9.4 T
Other
Similar Uses C Section 2.6 G
Section 7.3 Spatial Requirements
A. Area and Density. All LOTs and BUILDINGs shall meet the minimum area and width
requirements of Table 7-3. New LOTs shall not be created, except in conformance with these
requirements.
120
Town of Seabrook Island Development Standards Ordinance 73
Table 7-3. LOT AREA, Width, and Density Requirements, Mixed-Use District
Zoning
District
Size Area Occupied by Non-
RESIDENTIAL USES (%)
Min.
Width (ft.)
Density
(max.
units/ NET
Resid.
ACRE
Project
Area
(acres)
Minimum
Min. OPEN
SPACE (%) Minimum Maximum
MU 5 20 20 50 200 15
B. Density Bonus. A residential density bonus over and above the density otherwise allowed in
the mixed-use district may be approved by TOWN COUNCIL provided the applicant increases
the percentage of the total project area dedicated for OPEN SPACE. This bonus may be
granted only if specifically requested by the applicant. Such bonus shall consist of an
additional one (1) unit per NET ACRE of allowable density for every additional five (5) percent
of HIGH GROUND land area devoted to dedicated OPEN SPACE beyond the minimum
requirement; provided, the maximum bonus shall not exceed an additional five (5) units per
NET ACRE.
C. SETBACKs. All STRUCTUREs and their placement on a LOT shall conform to the minimum
dimensional requirements listed in Table 7-3a.
Table 7-3a. Dimensional Requirements, Mixed-Use District
Zoning District Maximum BUILDING
HEIGHT (ft./stories)
Minimum Yard SETBACKs (ft.)22
Front Side Rear Parking BUILDING
MU 36 20 20 20 40
D. OPEN SPACE. Dedicated OPEN SPACE shall be provided in accordance with the following
standards:
1. A minimum 20 percent of the gross land area, as specified in Table 7-3, shall be dedicated
OPEN SPACE.
2. Dedicated OPEN SPACE shall be shown on the concept plan and preliminary PLAT, if
applicable, and shall be labeled to specify that the land is to be dedicated for OPEN
SPACE purposes. The OPEN SPACE land is to be permanently reserved for OPEN SPACE
purposes. The applicant shall convey the dedicated OPEN SPACE as a condition of
approval through any of the following means, as approved by the TOWN COUNCIL:
a. Deeded in perpetuity to the TOWN;
b. Reserved for common use or ownership of all property owners within the
DEVELOPMENT by covenants in the deeds approved by the TOWN attorney. A copy
of the proposed covenants shall be submitted with the application for final site plan
approval;
22 Setbacks apply to the perimeter boundary of the project area. Individual setbacks within the mixed-use
development shall be determined during the development plan review process, based on the setback
requirements for the zoning district corresponding with the proposed use.
121
Town of Seabrook Island Development Standards Ordinance 74
c. Deeded in perpetuity to a private, non-profit, tax-exempt organization legally
constituted for conservation purposes under terms and conditions that ensure the
perpetual protection and management of the property for conservation purposes. A
copy of the proposed deed and relevant corporate documents of the land trust shall
be submitted with the final site plan application;
d. Deeded to a property owner's association or REGIME within the DEVELOPMENT upon
terms and conditions approved by the TOWN attorney that will ensure the continued
use and management of the land for the intended purposes. If this option is selected,
the formation and incorporation by the applicant of one or more appropriate property
owners' associations or REGIMEs shall be required prior to approval. A copy of the
proposed property owner's deed and the by-laws and other relevant documents of
the property owner's association or REGIME shall be submitted with the final site plan
application. The following shall be required if OPEN SPACE is to be dedicated to a
property owners' association or REGIME:
i. Covenants providing for mandatory membership in the association/REGIME and
setting forth the owner's rights, interests, and privileges in the association and the
common land, must be included in the deed for each LOT or unit;
ii. The property owners' association or REGIME shall have the responsibility of
maintaining the OPEN SPACE and shall operate and maintain any recreational
facilities which may be provided within the OPEN SPACE;
iii. The association or REGIME shall have the authority to levy charges against all
property owners to defray the expenses connected with the operation and
MAINTENANCE of OPEN SPACE and recreational facilities; and
iv. The applicant shall maintain control of dedicated OPEN SPACE and be
responsible for its MAINTENANCE until DEVELOPMENT sufficient to support the
association or REGIME has taken place.
3. OPEN SPACE to be dedicated to the TOWN shall have shape, dimension, character,
location, and topography to ensure appropriate public access and usability, and to
accomplish at least two (2) of the following OPEN SPACE purposes:
a. natural resource conservation,
b. WETLAND and water course conservation,
c. selective forestry,
d. wildlife habitat,
e. recreation,
f. civic purposes, or
g. scenic preservation.
122
Town of Seabrook Island Development Standards Ordinance 75
4. Dedicated OPEN SPACE features that are not dedicated to the TOWN may be open to the
general public or restricted to the residents or property owners within the
DEVELOPMENT.
5. Streets, sidewalks, PARKING LOTs and other IMPERVIOUS SURFACEs shall be excluded
from the calculation of required OPEN SPACE. However, lands occupied by bike paths,
tennis courts, or similar common recreational amenities may be counted as dedicated
OPEN SPACE; provided, such IMPERVIOUS SURFACEs shall not constitute more than 10
percent of the total required OPEN SPACE.
6. Up to 50 percent of the dedicated OPEN SPACE requirement may be satisfied with land
covered by water or by stormwater detention or retention basins if the TOWN determines
that such a water body or basin constitutes an amenity that contributes to the character of
the mixed-use DEVELOPMENT and offers an active or passive leisure experience.
7. At least 50 percent of the dedicated OPEN SPACE within a mixed-use DEVELOPMENT
shall be usable for active and passive recreation including, but not limited to, walking,
biking, playfields, picnicking, playgrounds, relaxation, and boating.
8. The dedicated OPEN SPACE shall not be included in SUBDIVISION LOTs designated for
DEVELOPMENT or in LOT size calculations.
9. All approved OPEN SPACE shall be dedicated in accordance with the provisions of this
section and as approved by TOWN COUNCIL prior to commencing any construction,
regardless of whether or not the project will be completed in phases.
Section 7.4 Review Procedures
All requests for approval of a mixed-use zoning district shall be subject to the review and approval
procedures of this section. Mixed-use zoning may be established on any property at the initiation
of the TOWN or by rezoning application submitted by the property owner. If initiated by the
TOWN, DEVELOPMENT of the property shall be subject to review and approval of concept and
final DEVELOPMENT plans, in accordance with the applicable provisions of this section.
A. Approval Authority.
1. The ZONING ADMINISTRATOR and PLANNING COMMISSION shall have review and
recommendation authority for the concept plan.
2. The TOWN COUNCIL shall have final approval authority for the concept plan.
3. The ZONING ADMINISTRATOR shall have approval authority for a final plan/site-specific
plan where no major changes to the approved concept plan, as defined in Article 14.8, are
required.
B. Pre-application Review.
1. All applicants seeking mixed-use zoning approval shall schedule a pre-application
conference with the ZONING ADMINISTRATOR to discuss the proposed DEVELOPMENT
prior to applying. The ZONING ADMINISTRATOR may include representatives from any
123
Town of Seabrook Island Development Standards Ordinance 76
outside agency, department, entity, or consultant as he or she deems appropriate. At the
pre-application conference, the ZONING ADMINISTRATOR shall review a proposed
sketch plan.
2. At minimum, the sketch plan shall contain the following information:
a. Location map of the proposed site;
b. General description of proposed land uses, including approximate location and
acreage; and
c. Proposed GROSS DENSITY of the DEVELOPMENT, type of dwellings proposed,
proposed GROSS FLOOR AREA to be devoted to non-RESIDENTIAL USEs and
activities and NET DENSITY of individual areas or parcels within the DEVELOPMENT.
3. A narrative description shall also accompany the sketch plan. The narrative shall describe
how the proposed mixed-use zoning and uses relate to the goals and recommendations
of the TOWN’s COMPREHENSIVE PLAN. The narrative shall also describe any anticipated
inconsistencies between the proposed DEVELOPMENT and the provisions of this article.
4. The ZONING ADMINISTRATOR shall review the sketch plan and narrative and advise the
applicant regarding conformance or inconsistencies with the requirements of this article
and any modifications that may be required to comply with the ordinance. Once the pre-
application process is complete, if the applicant wishes to proceed with the zoning
application, a concept plan of the entire mixed-use DEVELOPMENT shall be prepared and
submitted with a formal application.
C. Concept Plan.
1. Application requirements.
a. A complete application shall be filed on a form provided by the ZONING
ADMINISTRATOR, along with the application fee, a concept plan meeting all
requirements of this section, and any DEVELOPMENT conditions proposed by the
applicant. Incomplete applications or concept plans shall be returned to the applicant
without further processing.
b. Unless specifically modified by DEVELOPMENT conditions accepted by the TOWN
COUNCIL, a mixed-use DEVELOPMENT shall comply with all regulations in effect at
the time of rezoning approval.
c. The mixture of uses shall be limited to those specified in Table 7-2.
2. Concept plan requirements. At minimum, the concept plan shall contain the following
information in schematic form, unless specifically waived by the ZONING
ADMINISTRATOR:
a. A title, giving the names of the developers and property owners, the date, scale, and
the PERSON or firm preparing the plan.
124
Town of Seabrook Island Development Standards Ordinance 77
b. A vicinity map and north arrow.
c. The location and size of the project site, including the total GROSS ACREAGE and total
HIGH GROUND
d. The current zoning of the subject property and surrounding properties.
e. The landowners and general land use of adjoining properties.
f. Location of proposed uses assigned to sub-areas.
g. A tabulation of total DWELLING UNITs and gross residential densities and the GROSS
FLOOR AREA to be devoted to non-RESIDENTIAL USEs and activities.
h. Location of existing FLOOD zones, CRITICAL AREAS, WATERBODIES, WETLANDS,
and other riparian areas, and significant environmental features.
i. General layout of transportation routes including streets and major pedestrian ways.
j. The location of existing infrastructure (examples include roadways, sidewalks, and
proximity of nearest water and/or sewer mains).
k. Conceptual location for any proposed public uses including schools, parks, fire, and
medical emergency services, etc.
l. General areas to be designated for common OPEN SPACE.
m. Tree survey, if applicable, in accordance with Section 11.5 B.
n. A TRAFFIC IMPACT ANALYSIS shall be required. The analysis must be prepared by a
professional transportation engineer with expertise in the preparation of TRAFFIC
IMPACT ANALYSES and shall follow the requirements of Section 8.4.
o. A phasing plan, if applicable.
3. Review and approval.
a. Staff review.
i. Upon receipt of a complete mixed-use DEVELOPMENT application, the ZONING
ADMINISTRATOR shall distribute the application materials to the appropriate
TOWN staff, as well as representatives from any outside agency, department,
entity, or consultant as he or she deems appropriate.
ii. The ZONING ADMINISTRATOR shall prepare a staff report based on the
comments provided by other reviewers. The report and recommendations shall be
forwarded to the PLANNING COMMISSION for review and recommendation.
iii. The ZONING ADMINISTRATOR shall provide notice as required by Section 19.2
and schedule consideration of the mixed-use application on the next available
125
Town of Seabrook Island Development Standards Ordinance 78
PLANNING COMMISSION agenda. The ZONING ADMINISTRATOR will then
inform the applicant/agent when the request will appear on the PLANNING
COMMISSION agenda for action on the application. The applicant or authorized
representative must be present at the meeting or the matter will not be heard.
b. Optional joint work session. The applicant may request a joint work session with the
TOWN COUNCIL and PLANNING COMMISSION to provide an opportunity to present
the application and respond to any initial questions that members may have regarding
the proposed DEVELOPMENT.
i. If the request is granted, the ZONING ADMINISTRATOR shall schedule the joint
work session and notify the applicant when the session will occur.
ii. No decision or final action may be taken at a joint work session.
c. PLANNING COMMISSION review and recommendation.
i. The ZONING ADMINISTRATOR shall present the staff report to the PLANNING
COMMISSION.
ii. After allowing time for presentation from the applicant and public comments, if
any, the PLANNING COMMISSION shall consider the application for conformance
with the requirements of this ordinance and the review criteria in Section 7.5.
iii. The PLANNING COMMISSION shall then make a recommendation to the TOWN
COUNCIL to approve or deny the application.
d. TOWN COUNCIL hearing and final decision.
i. The staff report and PLANNING COMMISSION recommendations shall be
forwarded to the TOWN COUNCIL for review and final decision.
ii. The ZONING ADMINISTRATOR shall provide notice, as required by Section 19.2 C,
for a public hearing and schedule the mixed-use application on the next available
TOWN COUNCIL agenda.
iii. The ZONING ADMINISTRATOR shall present the staff report and PLANNING
COMMISSION recommendation.
iv. After allowing time for presentation from the applicant and holding the required
public hearing, the TOWN COUNCIL shall consider the application for
conformance with the requirements of this ordinance and the review criteria in
Section 7.5.
v. Following the rezoning procedures, as specified in Section 19.2, the TOWN
COUNCIL shall approve, deny, or refer the application back to the PLANNING
COMMISSION for further consideration.
126
Town of Seabrook Island Development Standards Ordinance 79
4. DEVELOPMENT conditions. The applicant may offer conditions to be attached to the
rezoning. Proposed conditions shall be submitted as part of the application and concept
plan.
a. Conditions may be more restrictive than the requirements of this article but shall not
alter the intent of the applicable mixed-use district nor permit uses not otherwise
authorized by Table 7-2.
b. The conditions shall be described in writing.
c. The DEVELOPMENT conditions shall be binding upon the property, unless amended
in conformance with the requirements of this section. Upon approval of the rezoning
application, the approved DEVELOPMENT conditions shall be recorded in the
Register of Deeds Office.
d. If phasing is proposed, the applicant shall provide a general breakdown showing the
various phases and the estimated schedule of construction.
D. Final Plan or Site-Specific Plan.
1. Phasing. The mixed-use DEVELOPMENT may be completed in multiple phases. If the
DEVELOPMENT is to be completed in a single phase, the applicant shall prepare and
submit a final development plan. If the DEVELOPMENT is to be completed in more than
one phase, the applicant shall prepare and submit a site-specific plan prior to construction
of each phase of the project. In either case, the final plan/site-specific plan shall contain
the elements required in Section 14.5 for final development plans and conform to the
previously approved concept plan.
2. Timing. An application for approval of the final plan for the mixed-use DEVELOPMENT or
a site-specific plan for the initial phase(s) shall be submitted to the ZONING
ADMINISTRATOR within 12 months of the date of TOWN COUNCIL’s approval of the
concept plan and rezoning.
3. ZONING ADMINISTRATOR review and approval.
a. The ZONING ADMINISTRATOR shall distribute the final plan/site-specific plan
application to the appropriate TOWN staff, as well as representatives from any outside
agency, department, entity, or consultant as he or she deems appropriate.
b. Once the plan has been received and reviewed by the appropriate reviewers and the
applicant has met all of the required elements of this ordinance, any other applicable
regulations, and the approved concept plan and DEVELOPMENT conditions, the
ZONING ADMINISTRATOR shall issue a final approval.
c. If the plan is inconsistent in any aspect with the approved concept plan, the ZONING
ADMINISTRATOR shall follow the procedure specified in this section for amending an
approved plan.
E. Amendments. Any and all amendments to the concept plan, development conditions and/or
final/site-specific plans for the mixed-use shall be subject to the following review procedures:
127
Town of Seabrook Island Development Standards Ordinance 80
1. The ZONING ADMINISTRATOR shall have the authority to approve:
a. Changes which result in a decrease in approved density or BUILDING size, either
residential or non-residential.
b. Change in land use designation from MULTI-FAMILY, TWO-FAMILY, or TOWNHOME
to SINGLE-FAMILY or a change from any other use to OPEN SPACE/passive
recreation; provided, the minimum required proportion of non-RESIDENTIAL USEs
shall be retained.
c. Change in infrastructure features (i.e., roads/access, sewer, water, storm drainage)
internal to the mixed-use area which are clearly beneficial to the occupants of the
mixed-use area and will have no impact on adjoining or off-site properties.
d. Movement of BUILDINGs within the same general vicinity as shown on the approved
plan.
e. Internal rearrangement of a PARKING LOT that does not affect the number of
PARKING SPACEs or alter access locations or design.
2. All other changes shall be considered as a new application and processed in accordance
with the provisions of Section 7.4 C and D.
Section 7.5 Development Review Criteria
Applications for mixed-use DEVELOPMENT shall only be approved upon a finding of compliance
with the following criteria:
A. Rezoning Criteria. The criteria of Article 19.3 B for rezonings shall be satisfied.
B. Development Plan Standards. The standards of Section 14.6 for development plans shall be
satisfied.
C. Consistency with COMPREHENSIVE PLAN. All mixed-use DEVELOPMENT shall be
designed, constructed, and maintained in conformance with the applicable guidelines and
standards established by the TOWN’s COMPREHENSIVE PLAN.
D. Integration with Transportation System. Mixed-use DEVELOPMENTs shall be designed to
integrate into the adjacent transportation system relative to:
1. Pedestrian connections to ensure accessibility to current or future DEVELOPMENT, if
applicable;
2. Connectivity to existing and future roadways, sidewalks, and pathways;
3. Complete streets roadway design that accommodates vehicular, pedestrian, and bicycle
transportation modes;
4. Strategic locations of PARKING LOTs and STRUCTUREs to facilitate shared parking; and
128
Town of Seabrook Island Development Standards Ordinance 81
5. Access management to provide internal connections between uses and minimize
individual driveway access to perimeter roads.
E. Impact on Infrastructure. The DEVELOPMENT is staged in a manner that allows for and
facilitates the timely provision of public utilities, facilities, and services.
F. Compatibility of Uses and STRUCTUREs. The mixed-use DEVELOPMENT is planned so land
uses and densities create an appropriate transition to existing or planned uses and densities
on adjoining properties.
G. DEVELOPMENT Balance. If constructed in phases, each phase shall include a mixture of
residential types and/or residential and non-RESIDENTIAL USEs to ensure that each phase
contributes to the mixed-use concept.
H. General Site Design: The following characteristics shall be incorporated into the mixed-use
DEVELOPMENT:
1. Pedestrian accessibility/concentration of DEVELOPMENT (critical mass) in a compact,
walkable area.
a. Uses are concentrated to promote convenient pedestrian access.
b. Pedestrian circulation is clearly defined and connects all uses.
c. Bicycle and pedestrian access are provided to adjacent DEVELOPMENTs.
d. Sidewalks are provided on each side of rights-of-way or PRIVATE STREETs throughout
the DEVELOPMENT.
e. Strip commercial DEVELOPMENT characterized by single story uncoordinated,
unconnected BUILDINGs with large street FRONTAGE PARKING LOTs is specifically
prohibited. Strip malls with uncoordinated, unconnected out-parcels are prohibited.
All STRUCTUREs are fully integrated into the mixed-use project through common
design themes (including, but not limited to, lighting, benches, landscaping, other
decorative features but not necessarily BUILDING design), integration with a variety of
uses, nonlinear arrangement, common spaces, pedestrian walkways, vehicular access
connections, and other features.
2. Plazas, courtyards, and other common areas are provided for public gathering and
interaction. Amenities, such as benches, planters, lighting, fountains, art, and landscaping
that further the design theme of the project and encourage interaction shall be provided.
3. Mixed-use projects require special attention to BUILDING design because of the
relationship of land uses in close proximity. Functional integration of residential and
commercial uses shall be considered during design of mixed-use projects. The following
standards are intended to guide DEVELOPMENT of mixed-use projects:
a. The mixed-use DEVELOPMENT shall be designed and developed to provide an
appropriate interrelationship between the various uses and STRUCTUREs within the
129
Town of Seabrook Island Development Standards Ordinance 82
DEVELOPMENT through the use of complementary materials, unified streetscape
treatment, BUFFERing, connectivity for vehicular and pedestrian movement,
BUILDING orientation, parking location and height transition.
b. Residential and commercial uses may be located within the same or adjoining
STRUCTUREs, provided applicable health and safety regulations are followed.
c. STRUCTUREs shall provide architectural relief and interest, with emphasis at BUILDING
entrances and along sidewalks, to promote and enhance a comfortable pedestrian
scale and orientation. STRUCTUREs shall have consistent scale and massing to create a
unified project. Compatibility with the immediate context is required. However,
gradual transitions in scale and massing are permitted.
i. Blank walls shall be avoided by including ground floor windows, recesses,
extensions and breaks in roof elevation.
ii. Design shall provide differentiation between ground level spaces and upper
stories. For example, bays or balconies for upper levels, and awnings, canopies, or
other similar treatments for lower levels can provide differentiation. Variation in
BUILDING materials, trim, paint, ornamentation, windows, or other features such as
public art, may also be used.
iii. Design shall ensure privacy in residential sectors through effective window
placement, soundproofing, landscape screening, or orientation of outdoor living
areas (e.g., balconies, PORCHes, and PATIOs). Opposite facing windows at close
distances should be offset vertically or horizontally or employ appropriate
materials (e.g., glazed or tinted) to protect privacy.
4. Residential uses and diversity of housing types may be required.
a. Subject to approval by TOWN COUNCIL, a mixed use development may be required
to incorporate one or more types of residential uses (SINGLE-FAMILY, MULTI-FAMILY,
TOWNHOME, cluster, or TWO-FAMILY) at densities not to exceed those permitted
within the MU district, where recommended by the PLANNING COMMISSION to
comply with the recommendations of the TOWN’s COMPREHENSIVE PLAN.
b. Where incorporated into the mixed-use DEVELOPMENT, SINGLE-FAMILY LOT sizes
shall be varied to provide a mixture of LOT sizes.
c. Minimum LIVABLE FLOOR AREA requirement for SINGLE-FAMILY detached units shall
be 850 sq. ft. All other residential types shall adhere to area per number of bedrooms,
as listed in the Residential District Table 5-3c.
5. Permitted flexibility in LOT sizes, SETBACKs, street widths and landscaping shall result in a
more livable DEVELOPMENT, preservation of natural features, and creation of OPEN
SPACE consistent with the policies of the COMPREHENSIVE PLAN and this ordinance.
130
Town of Seabrook Island Development Standards Ordinance 83
Section 7.6 Timing
Approval of the final plan or site-specific plan shall be vested in accordance with the provisions of
Section 1.6 B. of this ordinance.
Section 7.7 Site Development Regulations
A. In addition to the requirements of this article, all DEVELOPMENT in the Mixed-Use District
shall meet the applicable requirements as listed elsewhere in this ordinance:
B. General Provisions – Article 2
C. CONDITIONAL USE Requirements – Article 9
D. Environmental Performance Standards – Article 10
E. Trees, Landscaping and BUFFERing – Article 11
F. Parking and Loading – Article 12
G. Signs – Article 13
H. Site Plan Review – Article 14
131
Town of Seabrook Island Development Standards Ordinance 84
Article 8: Overlay Districts
ARTICLE
8
Overlay Districts
Town of Seabrook Island
Development Standards Ordinance
132
Town of Seabrook Island Development Standards Ordinance 85
Section 8.1 Seabrook Island Road Overlay District
A. Purpose. As the only public right-of-way providing access to and from the TOWN, it is
essential that Seabrook Island Road be maintained as a safe, efficient, functional, and
attractive corridor. The Seabrook Island Road OVERLAY DISTRICT is established for that
purpose. Regulations are established by this section to manage access to and from abutting
properties, create an inviting and unified appearance along the corridor, protect the
corridor’s prized natural features, promote alternate modes of transportation, and preserve
the value of abutting properties.
B. Applicability.
1. An OVERLAY DISTRICT is hereby established for a portion of Seabrook Island Road lying
between its intersection with Long Bend Drive and the roundabout located at its
intersection with Betsy Kerrison Parkway, Kiawah Island Parkway and Village Green Lane,
and extending 250 feet in both directions from the outer edge of the right-of-way or
property line. The boundaries of the Seabrook Island Road OVERLAY DISTRICT shall be as
illustrated on the official ZONING MAP referenced in Section 3.2.
2. The requirements of the Seabrook Island Road OVERLAY DISTRICT shall apply only to
property located within the corporate limits of the TOWN. Property within the boundaries
of the Seabrook Island Road OVERLAY DISTRICT, but located outside the corporate limits
of the TOWN, as of the effective date of this ordinance, shall become subject to the
requirements of this section only upon annexation into the TOWN; provided, any
construction or other DEVELOPMENT activity within the right-of-way, including but not
limited to encroachment permits, stormwater impacts, UTILITY construction, or other
IMPROVEMENTs or impacts occurring within the right-of-way shall be subject to the
requirements of this section.
3. The requirements of this section are in addition to, and shall supplement, those imposed
on the same lands by any underlying zoning provisions of this ordinance or other
ordinances of the TOWN. To the extent a conflict exists, these regulations shall supersede
all conflicting regulations, unless otherwise specified.
C. District Requirements.
1. PERMITTED and CONDITIONAL USEs. All PERMITTED and CONDITIONAL USEs allowed
within the underlying zoning district shall be permitted within the Seabrook Island Road
OVERLAY DISTRICT, subject to the applicable requirements of the underlying district,
unless superseded by this section.
2. Spatial Requirements. Except as otherwise specified, the spatial requirements of the
underlying zoning district shall control.
3. Permits.
a. A permit shall be required for any project within the Seabrook Island Road OVERLAY
DISTRICT (whether within or outside the corporate limits of the TOWN) which:
i. is proposed to have access to Seabrook Island Road via driveway or street;
133
Town of Seabrook Island Development Standards Ordinance 86
ii. which in any manner may impact drainage to, from, under, or within the Seabrook
Island Road right-of-way;
iii. which in any manner may impact utilities (whether owned and/or operated by the
TOWN or others) located above, below, or within the Seabrook Island Road right-
of-way; and/or
iv. which involves any other construction, change, or alteration of land within the
Seabrook Island Road right-of-way.
b. Applicants shall furnish a SITE DEVELOPMENT PLAN, as required by Article 14. and
such additional information concerning the proposed project, as may be required by
the TOWN, including the following, at no expense to the TOWN, before a permit is
considered:
i. a TRAFFIC IMPACT ANALYSIS, prepared to the TOWN’s specifications, in
accordance with the requirements of subsection 8.4 D, by a qualified
transportation engineer registered in the State of South Carolina;
ii. a drainage study, prepared to the TOWN's specifications, which identifies and
quantifies drainage from the proposed DEVELOPMENT, including its impact on
existing roadway drainage systems and compliance with all applicable provisions
of the TOWN's stormwater program; and
iii. a UTILITY impact study, prepared to the TOWN's specifications, which identifies
and quantifies the impact of the proposed DEVELOPMENT on any public or
private utilities located above, below or within the Seabrook Island Road right-of-
way.
c. Completed permit applications, including any required studies, shall be submitted to
the ZONING ADMINISTRATOR for review and approval by the PLANNING
COMMISSION prior to issuance of a permit. At its sole discretion, the PLANNING
COMMISSION may request independent consultant review of studies, plans, and
other documents submitted as part of the application. The applicant shall bear the
cost of such review.
d. The PLANNING COMMISSION may attach such conditions of approval as it deems
necessary to protect the interests of the TOWN, PUBLIC STREET or right-of-way, and
drainage system and utilities, including without limitation requiring the applicant to:
i. construct IMPROVEMENTs and/or erect traffic signs and/or signals determined to
be necessary to mitigate traffic impacts from the proposed DEVELOPMENT, or
alternatively, make payment to the TOWN to defray the entire cost of such
IMPROVEMENTs;
ii. install replacements and/or modifications to existing roadway drainage systems, as
specified by the TOWN, or alternatively, make payment to the TOWN to defray the
entire cost of such replacements and/or modifications; and
134
Town of Seabrook Island Development Standards Ordinance 87
iii. REPAIR and/or REPLACE utilities, as specified by the TOWN, or alternatively, make
payment to the TOWN to defray the entire cost of doing the same or reach
agreement regarding the costs with any UTILITY not controlled by the TOWN.
4. Access. Control over the number and location of access points along Seabrook Island
Road, as specified in this section, is necessary to reduce congestion, improve safety,
maintain acceptable traffic flow, and minimize confusion. Therefore, the standards of this
section shall apply to all property having FRONTAGE on and direct access to that segment
of Seabrook Island Road. It shall be the policy of the TOWN to minimize the number of
new points of access. The use of feeder streets and neighborhood road networks is
encouraged in order to minimize the number of roads and driveways intersecting with
Seabrook Island Road or other ARTERIAL STREETs.
a. Access in General.
i. For purposes of this section, points of vehicular access shall be defined to include
streets and driveways intersecting with (i.e., providing ingress to and egress from)
Seabrook Island Road.
ii. To the extent feasible, properties abutting Seabrook Island Road shall not have
direct access to that street, but shall provide street FRONTAGE on interior,
collector roads.
iii. To the extent feasible, tract property abutting Seabrook Island Road shall be
provided with one (1) point of vehicular access to the tract. SUBDIVISION of
property subsequent to the effective date of this section shall not entitle the
owner(s) to direct access if alternative access through interior roads is either
available or feasible.
iv. To the extent feasible, vehicular access to Seabrook Island Road shall be limited to
no more than one (1) point of access per every 600 ft. when the proposed access
point is located within or adjacent to the public right-of-way.
b. Driveway Location.
i. Driveways shall be positioned to minimize interference with the free movement of
traffic, to provide adequate sight distance, and to provide the most favorable
driveway grade.
ii. Driveways, including the radii, but not including right turn lanes, passing lanes,
and tapers, shall be located entirely within the right-of-way FRONTAGE of the
property being served, unless otherwise approved by the PLANNING
COMMISSION, and upon written certification from the adjacent property owner
agreeing to such encroachment.
c. Driveway Spacing.
135
Town of Seabrook Island Development Standards Ordinance 88
i. Minimum spacing between
two driveways, between a
driveway and a street
intersection, or between two
street intersections, on the
same side of the street, shall
be 600 feet. The minimum
spacing shall be measured
from centerline to centerline
for all driveways and street
intersections.
ii. To reduce left-turn conflicts, new
driveways shall be aligned with
those across the street, where
possible. If alignment is not
possible, driveways shall be
offset from those on the
opposite side of the street by at
least 200 feet, measured from
centerline to centerline. The
PLANNING COMMISSION may
reduce this requirement, as
provided in paragraph (d)
below, where there is insufficient
FRONTAGE and shared access
with an adjacent site is not
feasible. Greater offsets may be required depending on the expected inbound
and outbound turn volumes to and from both driveways.
d. Modification of Requirements.
i. Modification to the spacing and other requirements above may be permitted by
the PLANNING COMMISSION under the following conditions, provided the
requirements of paragraph d(ii) are also satisfied.
(a) The modification will allow an existing driveway to remain that does not meet
the standards of this section but that has, or is expected to have, very low traffic
volumes (less than 50 in- and out-bound trips per day) and is not expected to
impact safe traffic operations.
(b) The use is expected to generate a relatively high number of trips (exceeding
200/peak hour) and an additional driveway will improve overall traffic
operations.
(c) Practical difficulties exist on the site (sight distance limitations, existing
DEVELOPMENT, soil conditions, the presence of CRITICAL AREAS,
WATERBODIES, or WETLANDs, or unique site configuration) that make
compliance unreasonable; or existing off-site driveways make it impractical to
fully comply with the standards.
136
Town of Seabrook Island Development Standards Ordinance 89
(d) Because of restricted turning movements or the presence of a median that
restricts turning movements, the driveway will not contribute to congestion or
create an unsafe situation.
ii. The PLANNING COMMISSION may waive or modify certain requirements of this
section upon consideration of the following:
(a) The proposed modification is consistent with the general intent of the
standards of this section and the recommendations of the TOWN’s
COMPREHENSIVE PLAN.
(b) Driveway geometrics have been improved to the extent practical to reduce
impacts on traffic flow.
(c) Shared access has been provided, or the applicant has demonstrated it is not
practical.
(d) Such modification is the minimum necessary to provide reasonable access, will
not impair public safety, will not prevent the logical DEVELOPMENT or
redevelopment of adjacent sites, and is not simply for convenience of the
DEVELOPMENT.
e. Driveways Permitted.
i. In the case of a CORNER LOT or parcel, access shall only be provided from the
intersecting street, not from Seabrook Island Road.
ii. One (1) driveway may be permitted to serve an individual LOT or parcel; provided,
the minimum spacing requirements of this section shall be maintained.
iii. The use of shared driveways or access roads is encouraged.
iv. One (1) additional driveway may be permitted for a property only as follows:
(a) The PLANNING COMMISSION determines that, based on a TRAFFIC IMPACT
ANALYSIS, the projected traffic volumes will warrant an additional access point
and traffic operations will be improved along the road as a result; and
(b) The minimum spacing requirements of this section will be met.
f. Driveway Design.
i. All driveways shall be designed according to the standards of the TOWN,
including the provision of necessary turn radii, clear vision corners, drainage
facilities, and utilities.
ii. For high traffic generators or where high left-turn demand is expected, the
PLANNING COMMISSION may require separate right- and left-turn egress lanes.
137
Town of Seabrook Island Development Standards Ordinance 90
iii. Where a boulevard entrance is proposed by the applicant or required by the
PLANNING COMMISSION, a fully curbed island shall separate the ingress and
egress lanes. The radii forming the edges on this island shall be designed to
accommodate the largest vehicle that will use the driveway. The minimum area of
the island shall be 180 square feet. For aesthetic purposes, the PLANNING
COMMISSION may require landscaping, tolerant of street conditions, on the
section outside the public right-of-way.
g. Shared Driveways and Service Roads.
i. Where the PLANNING COMMISSION determines that traffic operations and safety
along the Seabrook Island Road corridor will be benefitted, a shared driveway or
service road connecting two (2) or more properties or uses may be required.
ii. A shared driveway or service road shall be within a recorded access EASEMENT. A
draft of the access EASEMENT shall be provided to the TOWN for review prior to
filing.
iii. The number of access points along a service road shall be according to the
standards of this section. The PLANNING COMMISSION may allow temporary
access where the service road is not completed if a financial guarantee is provided
which assures elimination of the temporary access upon completion of the service
road. BUILDING permits shall not be issued until the financial guarantee has been
submitted to the TOWN.
h. Service Road Design Standards.
Service roads shall generally be
parallel to the front property
line and may be located either
in front of, adjacent to, or
behind principal BUILDINGs. In
considering the most
appropriate alignment for a
service road, the PLANNING
COMMISSION shall consider
the SETBACKs of existing and
proposed BUILDINGs and
anticipated traffic flow for the
site. However, placement of the service road intersection with the driveway providing
access to Seabrook Island Road shall be as far as possible from the street for safe and
efficient operation. The separation distance between the nearest edge of the street
and the nearest edge of a service road or drive aisle shall be equal to at least one-fifth
of the LOT DEPTH, but no less than 60 feet.
i. Access EASEMENT. The service road shall be within an access EASEMENT
permitting traffic circulation between properties. This EASEMENT shall be 40 feet
wide, except an access EASEMENT parallel to the PUBLIC STREET right-of-way
may be 30 feet wide, if approved by the PLANNING COMMISSION. The required
width shall remain free and clear of obstructions, unless otherwise approved.
138
Town of Seabrook Island Development Standards Ordinance 91
ii. Construction and materials. Service roads shall have a base, pavement, and gutter
in accordance with TOWN standards for PUBLIC STREETs, except the service road
shall have a minimum pavement width of at least 24 feet.
iii. Parking. The service road is intended to be used exclusively for circulation, not as a
parking or maneuvering aisle. The posting of "no parking" SIGNs may be required
along the service road. In reviewing the site plan, the PLANNING COMMISSION
may permit temporary parking in the EASEMENT area where a continuous service
road is not yet available; provided, the layout allows removal of the parking in the
future to permit extension of the service road.
iv. Access to service road. The PLANNING COMMISSION shall approve the location of
all access points to the service road; provided, a minimum separation distance of
125 feet shall be maintained between driveways along the service road.
v. MAINTENANCE. Each property owner shall be responsible for MAINTENANCE of
the EASEMENT and service road.
i. DOUBLE FRONTAGE Lots (Through Lots). LOTs which have DOUBLE FRONTAGE shall
not be permitted, except where essential to provide separation of residential
DEVELOPMENT from Seabrook Island Road. An EASEMENT of at least 10 feet in width,
across which there shall be no right of access, shall be required along the lot lines
abutting Seabrook Island Road. No right of access shall be granted except by the
PLANNING COMMISSION.
5. Landscaping. The area between any service road or driveway and the Seabrook Island
Road right-of-way shall be planted as a level A BUFFER, as specified in Section 11.3.
6. SIGNs. The SIGN requirements of Article 13 shall apply; provided, however, only one (1)
monument SIGN shall be permitted per parcel and shall comply with the following
requirements:
a. Maximum area: 12 square feet
b. Maximum height: six (6) feet
c. Minimum SETBACK from road right-of-way: 10 feet
d. External illumination only
e. Design, color, materials, and lettering shall conform to the standards adopted by the
PLANNING COMMISSION for such SIGNs.
7. Lighting. Lighting shall meet the requirements of subsection 2.1 E.
8. Non-motorized Connectivity. All properties subject to the Seabrook Island Road OVERLAY
DISTRICT shall provide paved connections to existing pathways for pedestrians and
cyclists.
D. Traffic Impact Analysis.
139
Town of Seabrook Island Development Standards Ordinance 92
1. Applicability.
a. TIA Required. Unless exempted, a TRAFFIC IMPACT AN
Text truncated. Open the original for the full document.
Source: Town of Seabrook Island website. First collected Oct 17, 2026.