Council Packet_2026-04-14
City of Simpsonville · Greenville County · meeting of Apr 10, 2026 · Agenda packets
Open the original document More from City of Simpsonville
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY COUNCIL MEETING AGENDAS ARE ACCURATE AS OF THE FRIDAY PRIOR TO THE MEETING BUT ARE SUBJECT TO
CHANGE UP TO TWENTY-FOUR (24) HOURS PRIOR TO THE MEETING. PLEASE CONTACT SIMPSONVILLE CITY HALL THE DAY
OF THE MEETING FOR AN UP -TO-DATE AGENDA AT 864-967-9526.
CITY OF SIMPSONVILLE: CITY COUNCIL BUSINESS MEETING
— AGENDA —
Council Chambers, Simpsonville City Hall | April 14, 2026 | 6 p.m.
1. CALL TO ORDER
Presiding Officer: Paul Shewmaker, Mayor
2. RO
LL CALL
Recorder: Ashley Clark, City Clerk
3. PLEDGE OF ALLEGIANCE
4. APPROVAL OF MINUTES
Business Meeting on March 10, 2026
5. CITI ZEN COMMENTS
(Code of Ordinances: Chapter 2. Article II. Division 2. Sec. 2-69.b.1) Citizens of the City or others who
have standi ng in the City, such as business owners, shall be entitl ed to appear before council at regular
meetings. Such persons may speak regarding matters that are within the jurisdiction of the City, except for
personnel matters. At least 10 minutes prior to the time the meeting is scheduled t o commence, such person
wishing to appear before council must place his or her name, address, and topic to be addressed on the public
comments sign-up list maintained by the City Clerk. Individual comments shall be limited to three minutes.
6. BUSINESS
A. Sec
ond Reading of Ordinance Z-2025-02, to propose rezoning of properties located at 118 N.E.
Main
St. and 124 N.E. Main St.
Jon Derby, Planning Director
B. Sec
ond Reading of Ordinance O-2026-03, to amend Division 2 (Junk or Abandoned Vehicles) of
Article 2 (Nuisances) of Chapter 18 (Environment)
Jon Derby, Planning Director
C. First
Reading of Ordinance Z-2026-01, to propose rezoning of property located at 206 Ladean
Court
Jon Derby, Planning Director
D. Resolution R -2026-08, t o accept the allocation of Community Development Bl ock Grant and Home
Funds
from Greenville County Redevelopment Authority as set for Program Year 2026
Tee Coker, City Administrator
E. Resolution R -2026-09, t o approve funding for an impact fee study and capital improvement plan
that will fund certain municipal facilities and equipment, public safety needs, and recreation
facilities (park)
Councilmember Tim Pinkerton, Ward 5
F. Resolution R -2026-10, t o include in the Fiscal Year 2026-2027 budget and make immediately
effective an approved updated fee schedule for processing public records requests per S.C. Code
§ 30-4-30(B) of South Caroli na Freedom of Information Act, S.C. Code § Title 30, Chapter 4
Justin Campbell, Community Relations Specialist
7. ADJOURNMENT
CITY OF SIMPSONVILLE: CITY COUNCIL BUSINESS MEETING
— MINUTES —
Council Chambers, Simpsonville City Hall | March 10, 2026 | 6 p.m.
1. CALL TO ORDER
Presiding Officer: Paul Shewmaker, Mayor
2. ROLL CALL
Councilmember Present Absent
Ward 1 – Chad O’Rear ü
Ward 2 – Aaron Rupe ü
Ward 3 – Shannon Williams ü
Ward 4 – Sherry Roche ü
Ward 5 – Tim Pinkerton ü
Ward 6 – Jerry Tuso ü
Mayor Paul Shewmaker ü
3. PLEDGE OF ALLEGIANCE
4. PRESENTATIONS
A. Heart Huddle AED Awareness through AED Placement and CPR Education
Connor Shaw, Founder of Heart Huddle, gave a presentation on Heart Huddle and awareness of
AED placement and CPR education. Mr. Sha w explained he worked with Simpsonville Parks &
Recreation Department Director Robbie Davis and Simpsonville Fire Department Training Officer
Caleb Carter to place AED units in Simpsonville parks. Mr. Carter was presented with the Life
Saving Award for his heroic efforts in saving Mr. Shaw’s life.
B. Greenville County Redevelopment Authority Annual Action Plan
Francisco Arnaiz, Program Manager for Greenville County R edevelopment Authority, presented
the GCRA Annual Action Plan for Program Year 2026.
5. APPROV AL OF MINUTES
Minutes from the Business Meeting on Feb. 10, 2026 were approved as written.
6. CITIZEN COMMENTS
There were no citizen comments.
7. BUSINESS ITEMS
A. Second Reading of Ordinance O-2026-01, Proposed ordinance for the issuance and sale of Cit
y
of Simpsonville, South Carolina Se wer System Revenue Refunding Bond, Series 2026 not
exceeding six -million seven -hundred fifty -thousand dollars ($6,750,000) an d other matters
relating thereto
Motion by Councilmember Pinkerton with a second by Councilmember Roche to approve Second
Reading of Ordinance O-2026-01, Proposed ordinance for the issuance and sale of City of Simpsonville,
South Carolina Sewer System Revenue Refunding Bond, Series 2026 not exceeding six-million seven-
hundred fifty-thousand dollars ($6,750,000) and other matters relating thereto. Yes – 6, No – 0. Motion
carried.
B. First Reading of Ordinance O-2026-02, Mayor and Council Compensation
Motion by Mayor Shewmaker with a second by Councilmember Roche to approve First Reading of
Ordinance O-2026-02, Mayor and Council Compensation. Yes – 2, N – 4. Dissenting: Councilmembers
O’Rear, Pinkerton, Rupe, and Tuso. Motion Failed.
C. First Reading of Ordinance O-2026-03, to amend Division 2 (Junk or Abandoned Vehicles) of Article 2 (Nuisances) of Chapter 18 (Environment) Motion by Councilmember Roche with a second by Councilmember O’Rear to approve First Reading of Ordinance O-2026-03, to amend Division 2 (Junk or Abandoned Vehicles) of Article 2 (Nuisances)of Chapter 18 (Environment) to the next business meeting. Yes – 6, N – 0. Motion Carried. D. Resolution R-2026-06, to approve a Second Amendment to the Amphitheatre Naming Rights and Banking Services Agreement and authorize the Mayor to execute the Second Amendment Motion by Councilmember Roche with a second by Councilmember Rupe to adopt Resolution R-2026-06, to approve a Second Amendment to the Amphitheatre Naming Rights and Banking Services Agreement and authorize the Mayor to execute the Second Amendment. Y – 6. N – 0. Motion Carried. E. Resolution R-2026-07, to authorize a Local Fund Match for Hazard Mitigation Grant projects to support stormwater improvements including the acquisition of real property in the City of Simpsonville Motion by Councilmember Pinkerton with a second by Councilmember Roche to approve Resolution R-2026-07, to authorize a Local Fund Match for Hazard Mitigation Grant projects to support stormwater improvements including the acquisition of real property in the City of Simpsonville. Y – 6. N – 0. Motion Carried. 8. ADJOURNMENT 6:46PM
Simpsonville Planning Department
Planning & Economic Development Director
Jon Derby
AGENDA ITEM
1 | Page
To: City Council –Second Reading
Meeting Date: 4/14/2026
Agenda Item: Proposed rezoning to ID
Subject: Z-2025-02 Proposed rezoning to property located at 118 &
124 NE Main St. Tax Map# 0315.00.02.004.00 &
0315.00.02.001.00
Applicant/Owner: Blue Ridge Land Holdings, LLC
Attachments: ☒Proposed Ordinance ☒Proposed Concept Plan
☒Proposed Statement of Intent ☒Applicant Material
☐Consent Letter ☒Locations Maps ☒Development
Agreement ☒Traffic Study ☒Renderings
Brief Description of request
The City of Simpsonville has received a signed petition requesting the rezoning of parcels of
land pursuant to Section 7.5 of the Simpsonville Zoning Ordinance. This petition is for two
parcels located at 118 & 124 NE Main St (tax map # 0315.00.02.004.00 & 315.00.02.001.00)
The applicant has requested that these two parcels be rezoned from B-U, Business Urban
to ID (Innovative Development). The developer is looking to create a mixed-use
development of multifamily and commercial retail within our city center.
Nothing has changed since the first reading on December 9
th, 2025. Staff has been
coordinating with Walker Consultants to conduct a downtown parking study. This study will
provide the City a better understanding of its current and future availability for parking.
Once complete, staff plans to present this study to council.
Existing Zoning Requested Zoning Surrounding Zoning Extraterritorial
Land Use
Size of Property
B-U, Business
Urban
ID B-U & B-G Town Center
Mixed-Use
2.44 +/- Acres
Simpsonville Planning Department
Planning & Economic Development Director
Jon Derby
Z-2025-02
2 | Page
Location & Site Description
These parcels contain the prior City Hall site and the vacant AAA/Suntrust building, with
surface parking on the rear portions. These parcels will be combined as one tax parcel in
the future, fronting NE Main St., E. College St., & Hedge St.
Statement of Intent
The Statement of Intent details a three-story, multifamily, mixed-use project, with surfacing
parking on the eastern side near Hedge St. The development will consist of a maximum 80
residential units comprised of studio, one, two, & three-bedroom units. 18,000 square feet
of commercial space will be provided on the main level, fronting NE Main St. & E. College
St. Access points will be installed on E. College St. and on Hedge St. 144 surface parking
spaces are being provided, hidden from Main St, behind the structure. Coworking spaces
and flexible office units will be integrated into the project. The development will incorporate
public art and streetscape elements to coincide with the city’s downtown streetscape
project. The development is proposing the use of EV (Electric Vehicle) charging stations as
well as solar power concepts to promote renewable energy options.
Comprehensive Plan
The City’s Comprehensive Plan identifies this area as Town Center Mixed Use. This
designation applies only in and around Downtown Simpsonville. It emphasizes the urban
character and the mix and intensity of activities uniquely suited to the town center. This
designation is intended to permit a true mix of all uses, except industrial, at the highest
levels of scale and density within the City and with unique development standards tailored
to the urban character of Downtown. It is particularly important to move the Downtown
towards becoming a center of activity not only in the day, but also at night and during
weekends, by promoting a mix of commercial, entertainment, residential, and other uses.
To help achieve this goal, creative forms of housing, such as lofts and residential units in
second-stories above ground level retail, should be encouraged.…
Zoning District
Per Section 2.11.1 of the Simpsonville Zoning Ordinance: “the ID, Innovative Development
District is established to provide flexibility in the planning and construction of development
Simpsonville Planning Department
Planning & Economic Development Director
Jon Derby
Z-2025-02
3 | Page
projects in accordance with an approved plan. In return for greater flexibility in site design
requirements, innovative development are expected to demonstrate exceptional quality
community designs that:
A. Preserve critical environmental resources;
B. Provide above-average open space amenities;
C. Demonstrate innovative and creative site planning techniques that improve upon
the layout and design of buildings, open space and circulation that would
otherwise be achieved by the standards of other allowable zoning districts;
D. Assure compatibility with surrounding land uses and neighborhood character; and
E. Provide greater efficiency in the layout and provision of roads,
utilities, and other infrastructure. ”
Site Improvements
The current overhead transmission lines, running in front of the old AAA/Suntrust building
will be placed underground to allow for maximum use of the site. This will allow for this
project to have a 0’ build line, along Main St and E. College St. Current vehicle access
points along Main St will be removed, allowing for more fluid traffic movement for this
stretch of Main St., while encouraging more walkability along the streetscape.
Public Hearing Proceeding
A public hearing regarding this petition was conducted on November 6th, 2025, before the
body of the Simpsonville Planning Commission. There was only one public comment, in
favor of the request with recommendation of color and pattern design.
Planning Commission Review
The Simpsonville Planning Commission reviewed the request to rezone the property at
their November 6th, 2025, meeting. The Commission discussed the ingress/egress along
with the proposed unit counts. The topic of parking was discussed, and their Traffic
Engineer was available to answer other questions. By a vote of 4 -0, the Planning
Commission recommends approval of Z-2025-02.
Staff Comments
A traffic study has been conducted by the developers to determine potential impact from
the proposed project. This project will be the first ground-up construction in the
commercial core of the city in several years. The proposed design of the project will
incorporate the materials and colors accustomed to our city theme, while introducing
Simpsonville Planning Department
Planning & Economic Development Director
Jon Derby
Z-2025-02
4 | Page
fresh, innovative design elements that breathe new life into the area.
STAFF RECOMMENDATION: Approval of the requested rezoning set forth in
Ordinance Z-2025-02.
ORDINANCE NO. Z-2025-02
WHEREAS, the South Carolina Code of Laws of 1976, as amended, Chapter 23 Title
5 provides for the process for municipalities to rezone property; and
WHEREAS, the City of Simpsonville has enacted a Zoning Ordinance which governs
amendments to the Official Zoning Map; and
WHEREAS, the hereinafter described propert y was advertised on October 19, 2025,
and the City of Simpsonville Planning Commission held a public hearing on November 6,
2025.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
SIMPSONVILLE THAT:
1. ZONING CLASSIFICATION: The Official Zoning Map of the City of
Simpsonville is hereby amended to assign Tax Map # 0315.00-02-004.00 depicted in the deed
contained in Book 2759 on Page 834, & Tax Map# 0315.00- 02-001.00 depicted in the deed
contained in Book 2623 on Page 2891, of the official records of Greenville County Register of
Deeds and as depicted in Exhibit “A” & “B”, attached hereto, the zoning classification of I-D,
Innovative Development District.
2. PROVISION SEVERAGE: It is hereby declared to be the intention of the
governing authority of this municipality that the sections , subjections, paragraphes, sentences,
clauses and phrases are severable, and if any phrase, clause, sentence, paragraph, subsection, or
section of this Ordinance shall be declared invalid or unconstitutional by the valid judgment or
decree of any court or competent jurisdiction, such invalidity or unconstitutionality shall not
effect any of the remaining portions of this Ordinance so held to be invalid.
3. ORDINANCE SUPERSEDES PREVIOUS INCONSISTENT
LEGISLATION: All Ordinances or parts of Ordinances inconsistent herewith, which may
have heretofore been passed by the Simpsonville City Council, are hereby repealed.
(SIGNATURE PAGE FOLLOWS)
AN ORDINANCE TO AMEND THE ZONING MAP
OF THE CITY OF SIMPSONVILLE, SOUTH
CAROLINA OF LAND AT 118 NE MAIN STREET , &
124 NE MAIN STREET., TAX MAP# 0 315.00-02-
004.00, & 0315.00- 02-001.00 OWNED BY BLUE
RIDGE LAND HOLDINGS, LLC
ORDINANCE NO.: Z-2025-02
Page 2
This Ordinance shall be effective upon second and final reading by the City Council.
SIGNATURE OF MAYOR:
_________________________________
Paul Shewmaker
ATTEST:
__________________________________
Ashley Clark
City Clerk
APPROVED AS TO FORM:
_________________________________
Daniel Hughes
City Attorney
First Reading: December 9, 2025
Second Reading: April 14, 2026
ORDINANCE NO.: Z-2025-02
Page 3
EXHIBIT “A”
ORDINANCE NO.: Z-2025-02
Page 4
EXHIBIT B
±99,000-SF Mixed-Use DevelopmentLocated Along North East Main StreetCity of SimpsonvilleGreenville County, South Carolina
N Project No.: 25195-0023October 9, 2025Prepared by Alliance Consulting Engineers, Inc.
Documents prepared or furnished by Alliance Consulting Engineers, Inc. are instruments of service, and Alliance Consulting Engineers, Inc. retainsan ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the project is completed.NOTE: BOUNDARIES, TOPOGRAPHY, WETLANDS, AND STREAMS LOCATIONS ARE APPROXIMATE BASED OFF GEOGRAPHICINFORMATION SYSTEMS (GIS). A BOUNDARY AND TOPOGRAPHIC SURVEY ALONG WITH A WETLAND DELINEATION SHOULD BEPERFORMED TO DETERMINE ACCURATE BOUNDARY, TOPOGRAPHIC, AND WETLAND LOCATIONS.
7
11
4
9
1210
2426
10
SITE INFORMATION:TM#: 0315000200100, 0315000200400SIZE: ±2.52 ACRESEXISTING ZONING: B-U (BUSINESS - URBAN)PROPOSED ZONING: ID (INNOVATIVE DEVELOPMENT)SETBACKS: -FRONT = NONE-SIDE = NONE-REAR = NONEPARKING REQUIREMENTS:STALL WIDTH90-DEGREE STALL= 9-FT X 18FT24-FT AISLEPROVIDED PARKING COUNT: 144 SPACESPASSENGER: 139 SPACESADA: 5 SPACESPROPOSED BUILDING:MIXED USE DEVELOPMENT3 STORIES
EAST COLLEGE STREET
HEDGE STREET
NORTH EAST MAIN STREET
±99,000-SFMIXED USEDEVELOPMENT
PROPOSED BUILDING INFORMATION:RESIDENTIALAMENITYRETAILCOMMERCIALTOTAL LEVEL 113,9946,1478,9913,82332,955 LEVEL 232,95532,955 LEVEL 332,95532,955 TOTAL79,9046,1478,9913,82398,865 RESIDENTIAL UNIT COUNT: 73
Blue Ridge Land Holdings, LLC
NORTH MAIN STREET10
12
13
© 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc.
All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical,
photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc.
Burdette North
Statement of Intent for Innovative Development (ID) Rezoning
Project Name: Burdette North
Location: Southeast corner of NE Main Street and E. College Street, Simpsonville, SC
Parcels: Tax Map #0315000200400 (+/- 1.09-Acres) and #0315000200400 (+/- 1.43-Acres)
Current Zoning: Business-Urban
Proposed Zoning: Innovative Development (ID)
Developer: Blue Ridge Land Holdings, LLC
Architect: SHLTR Architects
Civil/Site Design: Alliance Consulting Engineers, Inc.
Traffic Impact Analysis: Impact Designs, Inc.
Surveying: Site Design, Inc.
Project Overview
Burdette North is proposed as a vibrant, mixed-use redevelopment designed to bring new
life and economic energy to the north end of Downtown Simpsonville. The project will
include up to 80 residential units (a mix of studios, one-bedroom, and two-bedroom
apartments) and +/-18,000 square feet of commercial space dedicated to retail,
restaurant, amenities, and coworking uses. The building will be a total of three (3) stories.
As shown on the included Conceptual Site Plan, the development will include 144 surface
parking spaces. Both existing structures on the site will be demolished to make way for this
new, cohesive urban development that aligns with the City’s vision for a more walkable,
connected, and active downtown district.
Innovative Features
Burdette North exemplifies the goals of the Innovative Development (ID) zoning by
introducing design and sustainability features that are new to the City of Simpsonville’s
Central Business District and Business Urban (B-U) zones. The project will include at least
two (2) of the following innovative components:
Coworking Space: Dedicated coworking suites and flexible office amenities will
serve local entrepreneurs, small businesses, and remote professionals, providing
modern workspace solutions within a walkable downtown setting.
Burdette North Statement of Intent
Blue Ridge Land Holdings, LLC
October 17, 2025 – Page 2 of 4
© 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc.All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc.
Public Art: The project will feature integrated public art installations—such as
murals, sculptures, or artist-designed streetscape elements—that contribute to
placemaking and enhance the visual identity of NE Main and College Streets.
Pervious Pavement: Portions of the parking and pedestrian areas will utilize
pervious pavement systems to reduce stormwater runoff, promote infiltration, and
improve site sustainability.
EV Charging Stations: Electric Vehicle (EV) charging infrastructure will be provided
to support the growing demand for sustainable transportation options.
Solar Power: Where feasible, solar panels will be integrated to supplement building
energy use and demonstrate commitment to renewable energy innovation.
These innovative elements will provide a unique character and forward-thinking design
approach, establishing Burdette North as a model for sustainable, mixed-use
redevelopment in the city.
Community Impact and Vision
Burdette North will bring a new level of vibrancy and activity to NE Main Street and College
Street, reinforcing the urban fabric of Downtown Simpsonville. The project’s blend of
residential and commercial uses will:
Activate the public-facing street level with restaurants, retail, and coworking spaces
Provide diverse housing options that appeal to young professionals, empty nesters,
retirees and small households
Encourage walkability and connectivity with nearby businesses and public amenities
Support the continued revitalization of the downtown corridor through attractive
design and public engagement features
As the second major downtown investment by Blue Ridge Land Holdings, LLC, following the
successful redevelopment of Burdette Central, this project continues the developer’s
commitment to high-quality, community-oriented growth in the City of Simpsonville.
Working with SHLTR Architects and Alliance Consulting Engineers, Inc., the design team will
deliver a well-integrated, visually appealing, and environmentally conscious project that
enhances both the aesthetic and economic vitality of the city.
Integrating residential uses into the City of Simpsonville’s downtown core brings vitality,
economic stability, and a stronger sense of community to the urban environment. Residents
living downtown provide support to local businesses, restaurants, and cultural venues,
helping sustain activity beyond typical business hours and creating a lively, 24-hour district.
Burdette North Statement of Intent
Blue Ridge Land Holdings, LLC
October 17, 2025 – Page 3 of 4
© 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc.All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc.
This mix of living, working, and leisure spaces reduces reliance on cars, encourages walking,
and fosters a more sustainable urban form. Moreover, downtown living attracts a diverse
range of people - young professionals, small families, and retirees alike—who contribute to
the social and cultural vibrancy of the area. By combining residential and commercial space,
this project will be dynamic, safe, and engaging to the City of Simpsonville’s downtown, and
serve as the center of urban life.
Property Access & Traffic Flow Coordination
Vehicle access to Burdette North will be on E. College and Hedge Streets (one
ingress/egress on each street). The project team has designed internal circulation to align
with the City’s soon-to-be implemented counterclockwise one-way circulation pattern. The
Traffic Impact Analysis has accounted for the City’s new traffic pattern. The plan is to have
Burdette North’s construction occurring simultaneously with Simpsonville’s Downtown
Revitalization and Traffic Realignment strategy and construction. Existing curb cuts along
NE Main Street and East College Street will be eliminated, along with one curb cut on Hedge
Street.
Eliminating multiple vehicle access points with this development offers several important
benefits for safety, efficiency, and overall site design. By consolidating access to two (2)
well-designed entrances/exits along E. College Street and Hedge Street, traffic movement
becomes more predictable and easier to manage, reducing potential conflict points
between vehicles, pedestrians, and cyclists. Fewer access points also enhance roadway
safety by minimizing turning movements and improving sight distances along adjacent
streets. Overall, limiting vehicle access points contributes to a safer, more attractive, and
functionally efficient development.
Utilities
This project will be served by Greenville Water, City of Simpsonville Sewer, and Duke Energy.
Duke Energy will locate transformers on the development site. Existing utilities and
connections will be used wherever possible. The Development Agreement between Blue
Ridge Holdings, LLC and the City of Simpsonville states that the City will use its best efforts
to relocate utilities in the public right-of-way, creating a cleaner, less-cluttered aesthetic.
Burdette North Statement of Intent
Blue Ridge Land Holdings, LLC
October 17, 2025 – Page 4 of 4
© 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc.All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc.
Stormwater
Because the site consists of mostly impervious surface, major stormwater infrastructure
improvements are not anticipated being needed, as this project assumes zero increase in
runoff. If required through Detailed Design, additional Stormwater Management will be
coordinated and compliant with Greenville County under its Stormwater Standards.
Signage
Burdette North will utilize monument signage where feasible on the site and within the City’s
Sign Ordinance requirements. The signage type and design will closely resemble existing
signage at Burdette Central to maintain consistency of brand.
Landscaping
The developer and design team will adhere to all landscaping requirements as required by
City Ordinance. Wherever possible, with Client direction, the team will strive to exceed
requirements.
Conclusion
Burdette North represents the next evolution of downtown Simpsonville—an innovative,
mixed-use community that strengthens the city’s identity, supports local business, and
creates a vibrant, connected environment for residents and visitors alike.
Through thoughtful design, sustainable features, and a commitment to quality
development, this project will serve as a catalyst for continued downtown growth and
exemplify the purpose and intent of the Innovative Development (ID) zoning designation.
FLOOR 01
0"
FLOOR 02
15' - 4"
FLOOR 03
27' - 0"
ROOF BRG.
37' - 0"
FLOOR 01
0"
FLOOR 02
15' - 4"
FLOOR 03
27' - 0"
ROOF BRG.
37' - 0"
COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MA Y NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PER MISSION
ELEVATIONS | SD04
PROJECT #: 2566
SHEET DATE: 10/13/2025
BURDETTE NORTH
CLIENT NAME
ADDRESS 1
CITY, STATE ZIP
1" = 10'-0"
E COLLEGE STREET - EXTERIOR ELEVATION
1" = 10'-0"
NE MAIN STREET - EXTERIOR ELEVATION
PEDESTRIAN
ACCESS TO
COURTYARD
NOTE:
SIGNAGE IS SUBJECT TO CHANGE. DRAWINGS REPRESENT CONCEPTS AND POTENTIAL LOCATIONS AT THIS PHASE
FINAL SELECTION OF MATERIALS AND COLOR MAY VARY
BRICK VENEER
ALUMINUM RAILINGS @
BALCONIES
ACCENT PANELING
HORIZONTAL SIDING
CORNICE DETAILING
STOREFRONT ENTRY
PLANTERS
OPTIONAL BUILDING SIGNAGE
CANOPIES AT COMMERCIAL ENTRY
COVERED PATIO SEATING
LEASING OFFICE ENTRY
AWNINGS OVER SMALLER SCALE
COMMERCIAL SUITES
STREET FACING COMMERCIAL SUITES
COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MA Y NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PER MISSION
RENDERING | SD05
PROJECT #: 2566
SHEET DATE: 10/13/2025
BURDETTE NORTH
CLIENT NAME
ADDRESS 1
CITY, STATE ZIP
VIEW @ CORNER OF NE MAIN STREET & E COLLEGE STREET
3,711 SF
AMENITY / LEASING
4,354 SF
RESTAURANT SPACE
LOBBY
4,136 SF
CO-WORKING
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
524 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
647 SF
COM. SUITES
SHARED
BATHROOMS
(SUITES &
AMENITY)
355 SF
CORE/UTILITY
COURTYARD
AREA BREEZEWAY
PATIO SEATING
715 SF
THD (2 BED)
715 SF
THD (2 BED)
715 SF
THD (2 BED)
715 SF
THD (2 BED)
715 SF
THD (2 BED)
715 SF
THD (2 BED)
3,348 SF
COMMERCIAL
EAST COLLEGE STREET
NORTHEAST MAIN STREET
67' - 0"
191' - 8" 23' - 4" 67' - 0"
266' - 4"
INDOOR/OUTDOOR SEATING
585 SF
THD
585 SF
THD
638 SF
THB
513 SF
THA
513 SF
THA
513 SF
THA
513 SF
THA
513 SF
THA
635 SF
1 BED
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,134 SF
2 BED
686 SF
1 BED
962 SF
2 BED
1,074 SF
2 BED 149 SF
UTILITY
773 SF
1+ BED
1,049 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
686 SF
1 BED
1,049 SF
2 BED
773 SF
1+ BED
962 SF
2 BED
672 SF
1 BED
672 SF
1 BED
972 SF
2 BED
585 SF
THD
585 SF
THD
585 SF
THD
585 SF
THD
30' - 6" 6' - 0" 30' - 6"
67' - 0"
282' - 0"
266' - 4"
585 SF
1 BED
585 SF
1 BED
1,174 SF
3 BED
1,049 SF
2 BED
1,049 SF
2 BED
635 SF
1 BED
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,134 SF
2 BED
686 SF
1 BED
962 SF
2 BED
1,074 SF
2 BED 149 SF
UTILITY
773 SF
1+ BED
1,049 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
686 SF
1 BED
1,049 SF
2 BED
773 SF
1+ BED
962 SF
2 BED
672 SF
1 BED
672 SF
1 BED
972 SF
2 BED
585 SF
1 BED
585 SF
1 BED
585 SF
1 BED
585 SF
1 BED
LEGEND
1 BED
1+ BED
2 BED
3 BED
AMENITY
CO-WORKING
COMMERCIAL 1
RESTAURANT
STUDIO
TH - 1+ BED
TH - 2 BED
UTILITY
COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION
OPTION 1 | SD01
PROJECT #: 2566
SHEET DATE: 10/13/2025
BURDETTE NORTH
CLIENT NAME
ADDRESS 1
CITY, STATE ZIP
1" = 30'-0"
OPTION 1 -LEVEL 1
1 1" = 30'-0"
OPTION 1 -LEVEL 2
2 1" = 30'-0"
OPTION 1 -LEVEL 3
3
NORTH
3,707 SF
AMENITY / LEASING
4,354 SF
RESTAURANT SPACE
LOBBY
3,967 SF
COMMERCIAL
4,770 SF
CO-WORKING
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
640 SF
THB (2 BED)
524 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
649 SF
COM. SUITES
SHARED
BATHROOMS
(SUITES &
AMENITY)
355 SF
CORE/UTILITY
FIRE STAIR
COURTYARD BREEZEWAY
PATIO SEATING
524 SF
THC (2 BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
513 SF
THA (1+ BED)
67' - 0" 23' - 4" 191' - 8"
67' - 0"
266' - 4"
524 SF
THC-2
513 SF
THA-2
640 SF
THB-2
513 SF
THA-2
513 SF
THA-2
513 SF
THA-2
513 SF
THA-2
513 SF
THA-2
637 SF
1 BED
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,133 SF
2 BED
686 SF
1 BED
991 SF
2 BED
1,043 SF
2 BED 149 SF
UTILITY
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,223 SF
3 BED
513 SF
THA-2
513 SF
THA-2
513 SF
THA-2
513 SF
THA-2
266' - 4"
30' - 6" 6' - 0" 30' - 6"
282' - 0"
67' - 0"
637 SF
1 BED
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,133 SF
2 BED
1,020 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,223 SF
3 BED
524 SF
1 BED
513 SF
STUDIO
1,049 SF
2 BED
1,049 SF
2 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
1,043 SF
2 BED
991 SF
2 BED
686 SF
1 BED
1,049 SF
2 BED
1,049 SF
2 BED
513 SF
STUDIO
640 SF
1 BED
149 SF
UTILITY
LEGEND
1 BED
1+ BED
2 BED
3 BED
AMENITY
CO-WORKING
COMMERCIAL 1
RESTAURANT
STUDIO
TH - 1+ BED
TH - 2 BED
UTILITY
COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION
OPTION 2 | SD02
PROJECT #: 2566
SHEET DATE: 10/13/2025
BURDETTE NORTH
CLIENT NAME
ADDRESS 1
CITY, STATE ZIP
1" = 30'-0"
OPTION 2 -LEVEL 1
1 1" = 30'-0"
OPTION 2 -LEVEL 2
2 1" = 30'-0"
OPTION 2 -LEVEL 3
3
NORTH
3,723 SF
AMENITY / LEASING
4,354 SF
RESTAURANT SPACE
RES. LOBBY
3,970 SF
COMMERCIAL
4,770 SF
CO-WORKING
524 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
536 SF
COM. SUITES
649 SF
COM. SUITES
SHARED
BATHROOMS
(SUITES &
AMENITY) 355 SF
CORE/UTILITY
FIRE
COURTYARD BREEZEWAY
PATIO SEATING
524 SF
1 BED
513 SF
STUDIO
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
812 SF
1+ BED
266' - 4"
67' - 0" 23' - 3 1/2" 191' - 8 1/2"
67' - 0"
30' - 6" 6' - 0" 30' - 6"
524 SF
1 BED
513 SF
STUDIO
812 SF
1+ BED
1,049 SF
2 BED
686 SF
1 BED
637 SF
1 BED
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,133 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
1,030 SF
2 BED 149 SF
UTILITY
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,223 SF
3 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
524 SF
1 BED
513 SF
STUDIO
812 SF
1+ BED
1,049 SF
2 BED
686 SF
1 BED
637 SF
1 BED
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
513 SF
STUDIO
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,133 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
1,030 SF
2 BED 149 SF
UTILITY
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
1,020 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
686 SF
1 BED
1,223 SF
3 BED
1,049 SF
2 BED
1,049 SF
2 BED
686 SF
1 BED
LEGEND
1 BED
1+ BED
2 BED
3 BED
AMENITY
CO-WORKING
COMMERCIAL 1
RESTAURANT
STUDIO
TH - 1+ BED
TH - 2 BED
UTILITY
COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION
OPTION 3 | SD03
PROJECT #: 2566
SHEET DATE: 10/13/2025
BURDETTE NORTH
CLIENT NAME
ADDRESS 1
CITY, STATE ZIP
1" = 30'-0"
OPTION 3 - LEVEL 1
1 1" = 30'-0"
OPTION 3 - LEVEL 2
2 1" = 30'-0"
OPTION 3 - LEVEL 3
3
NORTH
October 17, 2025
G r e e n v ille C o u n t y , S C
G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille , S o u t h C a r o lin a , G r e e n v ille
C o u n t y G I S D iv is io n , G r e e n v ille C o u n t y , S o u t h C a r o lin a G I S D iv is io n
O c t o b e r 3 0 , 2 0 2 5
0 1 5 0 3 0 07 5 f t
0 4 0 8 02 0 m
1 : 1 , 6 0 0
D is c la im e r : T h is M a p is n o t a L A N D S U R V E Y a n d is f o r r e f e r e n c e p u r p o s e s o n ly . D a t a c o n t a in e d in t h is m a p a r e p r e p a r e d f o r t h e in v e n t o r y o f R e a l P r o p e r t y f o u n d w it h in t h is ju r is d ic t io n , a n d a r e
G r e e n v ille C o u n t y , S C
G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille , S o u t h C a r o lin a , G r e e n v ille
C o u n t y G I S D iv is io n , G r e e n v ille C o u n t y , S o u t h C a r o lin a G I S D iv is io n
O c t o b e r 3 0 , 2 0 2 5
0 1 5 0 3 0 07 5 f t
0 4 0 8 02 0 m
1 : 1 , 6 0 0
D is c la im e r : T h is M a p is n o t a L A N D S U R V E Y a n d is f o r r e f e r e n c e p u r p o s e s o n ly . D a t a c o n t a in e d in t h is m a p a r e p r e p a r e d f o r t h e in v e n t o r y o f R e a l P r o p e r t y f o u n d w it h in t h is ju r is d ic t io n , a n d a r e
Know what's below.Call before you dig.
CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS225 ROCKY CREEK ROAD, GREENVILLE, SC 29615PH:(864)271-0496www.sitedesign-inc.com
1
NOVEMBER 5, 2025
IMPACT DESIGNS, INC.
Prepared by: Allen J. Reid, PE
TRAFFIC IMPACT STUDY
Burdette North
Simpsonville, South Carolina
Burdette North | i
Table of Contents
EXECUTIVE SUMMARY ................................................................................................................. iii
1. INTRODUCTION ......................................................................................................................... 1
1.1. Project Summary .............................................................................................................. 1
1.2. Existing Roadway Conditions .......................................................................................... 1
1.3. Planned Roadway Improvements .................................................................................... 2
1.4. Driveway Locations .......................................................................................................... 2
2. TRAFFIC VOLUME DEVELOPMENT..................................................................................... 7
2.1. Existing Traffic Volumes .................................................................................................. 7
2.2. Rerouted Traffic Volumes ................................................................................................ 7
2.3. Projected Traffic Volumes ............................................................................................... 7
2.4. Proposed Development Traffic Volumes ........................................................................ 8
2.5. Future Build Traffic Volumes ......................................................................................... 8
3. TRAFFIC IMPACT ANALYSIS ............................................................................................... 16
3.1. Turn Lane Analysis ........................................................................................................ 16
3.2. Intersection LOS Analysis .............................................................................................. 16
4. SUMMARY OF FINDINGS ....................................................................................................... 20
Burdette North | ii
Tables
Table 1 – Study Area Summary .................................................................................................................... 1
Table 2 – Trip Generation ............................................................................................................................. 8
Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections ............................. 16
Table 4 – Intersection Capacity Analysis Results ....................................................................................... 17
Figures
Figure 1 – Project Location ........................................................................................................................... 3
Figure 2 – Conceptual Site Plan .................................................................................................................... 4
Figure 3 – Existing Lane Configuration ....................................................................................................... 5
Figure 4 – No-Build Lane Configuration ...................................................................................................... 6
Figure 5 – Raw Existing (2025) Traffic Volumes ........................................................................................ 9
Figure 6 – One-Way Volume Adjustments ................................................................................................. 10
Figure 7 – Adjusted Existing (2025) Traffic Volumes ............................................................................... 11
Figure 8 – No-Build (2028) Traffic Volumes ............................................................................................. 12
Figure 9 – Site Trip Distribution ................................................................................................................. 13
Figure 10 – Site Trip Assignments ............................................................................................................. 14
Figure 11 – Build (2028) Traffic Volumes ................................................................................................. 15
Figure 12 – Recommended Lane Configuration ......................................................................................... 19
Appendices
A) Traffic Count Data
B) Turn Lane Analysis
C) Synchro Analysis Reports
D) SimTraffic Analysis Reports
E) Background Improvements
Burdette North | iii
EXECUTIVE SUMMARY
A traffic impact study was conducted for the proposed Burdette North development in accordance with
SCDOT guidelines. The proposed development is located on the southeast corner of College Street and NE
Main Street (SC 417) , in Simpsonville, South Carolina. The development is expected to consist of 12 ,812
square feet of retail and up to 80 multi-family units and is anticipated to be constructed by the end of 2028.
Direct access to Burdette North development is proposed to be provided via two full movement connections:
one on Hedge Street and one on College Street. The development is expected to have parallel parking along
Hedge Street, however, to be conservative all traffic was assumed to access the site through the site accesses.
A turn lane analysis was conducted at the site accesses utilizing the Build (2028) volumes. Based on build -
out volumes, there are no turn lanes warranted at the site accesses.
The capacity analysis indicates that the signalized study intersections approaches are expected to maintain
their LOS from No -Build to Build conditions, except for the northbound and southbound approach of NE
Main Street (SC 417) and Curtis Street. Although, the approaches are expected to operate at LOS D or better
in the Build scenario, which is still considered acceptable. Therefore, there is no mitigation recommended at
the signalized intersections.
Additionally, the unsignalized study intersections are expected to operate at an LOS C or better in all
scenarios. The site accesses are expected to operate at LOS B or better in the Build scenario. Therefore, there
is no mitigation recommended at the study intersections based on the capacity analysis.
Recommendations:
• None
Burdette North | 1
1. INTRODUCTION
The purpose of this report is to summarize the traffic impact study that was completed for the Burdette North
site in Simpsonville, South Carolina. The study was developed in accordance with SCDOT guidelines. This
report summarizes the procedures and findings of the traffic impact study.
1.1. Project Summary
The proposed development is located on the southeast corner of College Street and NE Main Street (SC 417),
in Simpsonville, South Carolina. The development is expected to consist of 12, 812 square feet of retail and
up to 80 multi-family units and is anticipated to be constructed by the end of 2028. This traffic impact study
analyzes the effects of the additional traffic associated with the proposed development during the weekday
AM (7:00 AM - 9:00 AM) and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the
purpose of the analysis includes:
• NE Main Street (SC 417) and College Street
• NE Main Street (SC 417) and Curtis Street
• Hedge Street and College Street
• Hedge Street and Curtis Street
• Main Street and College Street
• Main Street and Curtis Street
• Hedge Street and Access A
• College Street and Access B
The proposed development is expected to be built out by the end of 2028; therefore, 2028 was considered as
the future year for the purpose of this analysis. Refer to Figures 1 and 2 for the site location and the conceptual
site plan.
1.2. Existing Roadway Conditions
The primary roadways within the study area include NE Main Street ( SC 417), Curtis Street and College
Street. A summary of their existing characteristics is shown in Table 1.
Table 1 – Study Area Summary
Facility Name Route # Typical Cross
Section
Posted
Speed
Limit
Maintained
By 2024 AADT
College Street N/A 2-lane undivided 25 MPH Local No Data
Curtis Street 2-lane undivided 25 MPH SCDOT/Local 6,200
NE Main Street SC 417 2-lane undivided 35 MPH SCDOT 19,400
Refer to Figure 3 for an illustration of the existing geometry and traffic control at the study intersections.
Burdette North | 2
1.3. Planned Roadway Improvements
The City of Simpsonville and SCDOT intend to construct a project to convert Curtis Street and College Street
to a one-way pair with counterclockwise circulation. Based on the information provided by SCDOT and City
staff, the following geometric improvements are proposed:
Curtis Street
• Convert the existing 2-lane road to a one-way two-lane road travelling eastbound.
• Adjust all intersections along Curtis Street to account for the approach restrictions.
College Street
• Convert the existing 2-lane road to a one-way two-lane road travelling westbound.
• Adjust all intersections along College Street to account for the approach restrictions.
College Street and NE Main Street (SC 417)
• Extend the northbound left turn lane to have 150 feet of storage.
Curtis Street and NE Main Street (SC 417)
• Extend the southbound left turn lane to have 225 feet of storage.
It was assumed that these projects would be completed prior to the build out of the Burdette North
development. Refer to Figure 4 for an illustration of the background improvements. Refer to Appendix E for
improvement plans and drawings.
1.4. Driveway Locations
Direct access to Burdette North development is proposed to be provided via two full movement connections:
one on Hedge Street and one on College Street. The development is expected to have parallel parking along
Hedge Street, however, to be conservative all traffic was assumed to access the site through the site accesses.
±99,000-SF Mixed-Use DevelopmentLocated Along North East Main StreetCity of SimpsonvilleGreenville County, South Carolina
N Project No.: 25195-0023October 9, 2025Prepared by Alliance Consulting Engineers, Inc.
Documents prepared or furnished by Alliance Consulting Engineers, Inc. are instruments of service, and Alliance Consulting Engineers, Inc. retainsan ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the project is completed.NOTE: BOUNDARIES, TOPOGRAPHY, WETLANDS, AND STREAMS LOCATIONS ARE APPROXIMATE BASED OFF GEOGRAPHICINFORMATION SYSTEMS (GIS). A BOUNDARY AND TOPOGRAPHIC SURVEY ALONG WITH A WETLAND DELINEATION SHOULD BEPERFORMED TO DETERMINE ACCURATE BOUNDARY, TOPOGRAPHIC, AND WETLAND LOCATIONS.
7
11
4
9
1210
2426
10
SITE INFORMATION:TM#: 0315000200100, 0315000200400SIZE: ±2.52 ACRESEXISTING ZONING: B-U (BUSINESS - URBAN)PROPOSED ZONING: ID (INNOVATIVE DEVELOPMENT)SETBACKS: -FRONT = NONE-SIDE = NONE-REAR = NONEPARKING REQUIREMENTS:STALL WIDTH90-DEGREE STALL= 9-FT X 18FT24-FT AISLEPROVIDED PARKING COUNT: 144 SPACESPASSENGER: 139 SPACESADA: 5 SPACESPROPOSED BUILDING:MIXED USE DEVELOPMENT3 STORIES
EAST COLLEGE STREET
HEDGE STREET
NORTH EAST MAIN STREET
±99,000-SFMIXED USEDEVELOPMENT
PROPOSED BUILDING INFORMATION:RESIDENTIALAMENITYRETAILCOMMERCIALTOTAL LEVEL 113,9946,1478,9913,82332,955 LEVEL 232,95532,955 LEVEL 332,95532,955 TOTAL79,9046,1478,9913,82398,865 RESIDENTIAL UNIT COUNT: 73
Blue Ridge Land Holdings, LLC
NORTH MAIN STREET10
12
13
Burdette North | 7
2. TRAFFIC VOLUME DEVELOPMENT
2.1. Existing Traffic Volumes
Existing turning movement counts were conducted at the study intersections in September 2025, during the
AM (7:00 AM to 9:00 AM) peak period and the PM (4:00 PM to 6:00 PM) peak period. The 2025 traffic
volumes are illustrated in Figure 5.
2.2. Rerouted Traffic Volumes
As previously mentioned, the City of Simpsonville and SCDOT intend to construct a project to convert Curtis
Street and College Street to a one-way pair with counterclockwise circulation. Due to adjustment to the path
of travel, it was assumed that eastbound traffic on College Street will become eastbound traffic on Curtis
Street and westbound traffic on Curtis Street will become westbound traffic on College Street. Refer to Figure
6 and 7 for an illustration of the rerouted volumes on the study network.
2.3. Projected Traffic Volumes
Based on SCDOT Average Annual Daily Traffic (AADT) volumes, daily traffic volumes in the study area
have grown at a rate of 2 % in the past years. A 2% annual growth rate was applied to the 2025 rerouted
volumes to develop the No-Build (2028) volumes. This growth rate was applied to account for all background
growth in the area without any adjacent and/or the proposed developments. Refer to Figure 8 for an
illustration of the No-Build (2028) traffic volumes at the study intersections.
Burdette North | 8
2.4. Proposed Development Traffic Volumes
As mentioned previously, the proposed development is expected to consist of 12,812 square feet of retail and
up to 80 multi-family units and is anticipated to be constructed by the end of 2028 . The trip generation
potential for the proposed development was estimated utilizing methodology contained within the ITE’s Trip
Generation Manual, 11th Edition. Utilizing ITE dat a for ITE Code s 220 and 822 , traffic volumes were
generated for the weekday daily, the weekday AM peak hour, and the weekday PM peak hour. Refer to Table
2 for a summary of the trip generation potential of the proposed development.
Table 2 – Trip Generation
ITE Land Use (Code) Density Independent
Variable
Daily
Traffic
AM Peak PM Peak
Enter Exit Enter Exit
Strip Retail Plaza
(<40k)
(ITE Code 822)
12.81 KSF 698 18 12 42 42
Multi-Family Housing
(Low-Rise)
(ITE Code 220)
80 Dwelling
Units 588 11 37 35 20
Total New Trips 1,286 29 49 77 62
Traffic associated with the proposed development was distributed and assigned to the roadway network
based upon existing travel patterns and are summarized below:
• 30% to/from the north via NE Main Street (SC 417)
• 15% to/from the south vis NE Main Street (SC 417)
• 10% to/from the south via Hedge Street
• 25% to the east via Curtis Street
• 25% from the east via College Street
• 20% to the west via College Street
• 20% from the west via College Street
Refer to Figures 9 and 10 for the site trip distributions and assignments.
2.5. Future Build Traffic Volumes
The site generated traffic volumes were added to the No-Build (2028) traffic volumes to determine the Build
(2028) volumes. The Build (2028) volumes are illustrated in Figure 11.
Burdette North | 16
3. TRAFFIC IMPACT ANALYSIS
3.1. Turn Lane Analysis
A turn lane analysis was conducted at the site accesses utilizing the Build (2028) volumes. Based on build-
out volumes, there are no turn lanes warranted at the site accesses.
Refer to Appendix B for the turn lane warrants with the volumes graphed.
3.2. Intersection LOS Analysis
Using the existing , no-build, and build traffic volumes, intersection analyses were conducted for the study
intersections under Existing (2025) conditions, No-Build (2028) conditions and Build (2028) conditions. This
analysis was conducted using the Transportation Research Board’s Highway Capacity Manual (HCM 6 th
Edition) methodologies of the Synchro, Version 11 software.
Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level
of control delay at the intersection and characterize the operational conditions of the intersection traffic flow.
LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays,
and LOS F operations typically represent poor, forced-flow (bumper -to-bumper) conditions with high
vehicular delays, and are generally considered undesirable. Table 3 summarizes the HCM 6
th Edition control
delay thresholds associated with each LOS grade for signalized and unsignalized intersections.
Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections
Signalized Intersections Unsignalized Intersections
LOS Control Delay per Vehicle
(seconds) LOS Control Delay per Vehicle
(seconds)
A ≤ 10 A ≤ 10
B > 10 and ≤ 20 B > 10 and ≤ 15
C > 20 and ≤ 35 C > 15 and ≤ 25
D > 35 and ≤ 55 D > 25 and ≤ 35
E > 55 and ≤ 80 E > 35 and ≤ 50
F > 85 F > 50
The results of the capacity analysis for the study intersections under existing traffic control are summarized
in Table 4. Refer to Appendix C for the detailed capacity analysis reports and Appendix D for the queuing
analysis results.
Burdette North | 17
Table 4 – Intersection Capacity Analysis Results
Intersections Approach
LOS (Delay in seconds per vehicle)
Existing (2025) No-Build (2028) Build (2028)
AM PM AM PM AM PM
NE Main Street (SC 417)
& College Street
EB C (26.0) D (45.0) Analyzed under Existing conditions only
WB D (45.5) E (56.8) D (38.0) D (48.6) D (39.8) D (52.9)
NB B (18.5) A (9.8) A (4.0) A (3.0) A (4.1) A (3.6)
SB B (19.3) B (14.2) C (25.8) C (30.5) C (26.5) C (34.0)
Overall C (26.4) C (23.4) C (25.7) C (28.4) C (26.9) C (31.8)
NE Main Street (SC 417)
& Curtis Street
EB C (30.0) D (54.0) D (43.9) D (54.0) D (44.0) D (54.9)
WB C (29.5) D (46.8) Analyzed under Existing conditions only
NB C (23.5) C (20.4) B (18.2) C (34.1) B (18.4) D (36.3)
SB A (6.8) B (10.6) A (2.5) A (9.1) A (2.6) B (13.0)
Overall C (20.1) C (25.6) B (18.0) C (28.9) B (18.0) C (31.4)
Hedge Street & College
Street
EB - - Analyzed under Existing conditions only
WB A (8.0) A (8.6) - - - -
NB B (12.0) B (12.6) C (21.0) B (14.2) C (21.8) B (14.9)
Hedge Street & Curtis
Street
EB A (8.8) B (17.2) A (6.9) B (10.2) A (7.6) B (11.2)
WB B (19.1) B (19.8) Analyzed under Existing conditions only
NB D (42.7) D (44.6) B (19.6) D (38.3) B (19.9) D (41.1)
SB D (50.8) D (51.3) D (49.8) D (51.2) D (49.5) D (52.4)
Overall C (25.3) C (27.9) B (19.0) B (19.2) B (19.7) C (20.8)
Main Street & College
Street
EB A (7.7) A (7.6) Analyzed under Existing conditions only
WB A (7.6) A (7.8) - - - -
NB A (9.2) B (10.9) B (12.2) B (13.1) B (12.3) B (13.2)
SB A (9.8) B (10.7) B (10.4) B (11.8) B (10.5) B (11.9)
Main Street & Curtis
Street
EB A (7.8) A (7.8) - - - -
WB A (7.8) A (7.9) Analyzed under Existing conditions only
NB B (12.2) B (11.7) B (10.6) B (10.6) B (10.6) B (10.7)
SB B (10.2) B (11.7) B (12.4) B (13.4) B (12.4) B (13.6)
Hedge Street & Access A
EB
Analyzed under Build conditions only
B (10.0) A (9.8)
NB A (7.8) A (7.7)
SB - -
College Street & Access B WB Analyzed under Build conditions only - -
NB B (12.8) B (11.2)
Burdette North | 18
The capacity analysis indicates that the signalized study intersection s approaches are expected to maintain
their LOS from No -Build to Build conditions , except for the northbound and southbound approach of NE
Main Street (SC 417) and Curtis Street. Although, the approaches are expected to operate at LOS D or better
in the Build scenario, which is still considered acceptable. Therefore, there is no mitigation recommended at
the signalized intersections.
Additionally, the unsignalized study intersections are expected to operate at an LOS C or better in all
scenarios. The site accesses are expected to operate at LOS B or better in the Build scenario. Therefore, there
is no mitigation recommended at the study intersections based on the capacity analysis.
Figure 12 shows the proposed lane configurations and traffic control for the Build (2028) conditions.
Burdette North | 20
4. SUMMARY OF FINDINGS
A traffic impact study was conducted for the proposed Burdette North development in accordance with
SCDOT guidelines. The proposed development is located on the southeast corner of College Street and NE
Main Street (SC 417) , in Simpsonville, South Carolina. The development is expected to consist of 12 ,812
square feet of retail and up to 80 multi-family units and is anticipated to be constructed by the end of 2028.
Direct access to Burdette North development is proposed to be provided via two full movement connections:
one on Hedge Street and one on College Street. The development is expected to have parallel parking along
Hedge Street, however, to be conservative all traffic was assumed to access the site through the site accesses.
A turn lane analysis was conducted at the site accesses utilizing the Build (2028) volumes. Based on build -
out volumes, there are no turn lanes warranted at the site accesses.
The capacity analysis indicates that the signalized study intersections approaches are expected to maintain
their LOS from No -Build to Build conditions, except for the northbound and southbound approach of NE
Main Street (SC 417) and Curtis Street. Although, the approaches are expected to operate at LOS D or better
in the Build scenario, which is still considered acceptable. Therefore, there is no mitigation recommended at
the signalized intersections.
Additionally, the unsignalized study intersections are expected to operate at an LOS C or better in all
scenarios. The site accesses are expected to operate at LOS B or better in the Build scenario. Therefore, there
is no mitigation recommended at the study intersections based on the capacity analysis.
Recommendations:
• None
TECHNICAL APPENDIX
APPENDIX A
TRAFFIC COUNT DATA
File Name : Simpsonville(01 - SC 417 and College Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
SC 417
Southbound
College Street
Westbound
SC 417
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:00 AM 7 71 2 0 80 18 41 61 0 120 0 87 6 1 94 1 16 1 1 19 313
07:15 AM 12 80 2 0 94 17 37 68 1 123 2 126 4 0 132 4 28 1 4 37 386
07:30 AM 14 124 5 0 143 13 60 56 0 129 1 139 2 1 143 10 31 1 2 44 459
07:45 AM 14 121 4 0 139 15 54 50 0 119 2 154 2 0 158 15 29 1 1 46 462
Total 47 396 13 0 456 63 192 235 1 491 5 506 14 2 527 30 104 4 8 146 1620
08:00 AM 17 137 3 0 157 19 54 44 0 117 1 126 6 0 133 8 33 4 2 47 454
08:15 AM 16 133 7 0 156 17 32 46 0 95 2 133 6 0 141 3 32 6 1 42 434
08:30 AM 13 101 3 0 117 10 41 40 0 91 3 125 6 0 134 8 27 2 0 37 379
08:45 AM 18 102 4 0 124 8 40 41 0 89 2 118 4 0 124 15 27 2 0 44 381
Total 64 473 17 0 554 54 167 171 0 392 8 502 22 0 532 34 119 14 3 170 1648
Grand Total 111 869 30 0 1010 117 359 406 1 883 13 1008 36 2 1059 64 223 18 11 316 3268
Apprch % 11 86 3 0 13.3 40.7 46 0.1 1.2 95.2 3.4 0.2 20.3 70.6 5.7 3.5
Total % 3.4 26.6 0.9 0 30.9 3.6 11 12.4 0 27 0.4 30.8 1.1 0.1 32.4 2 6.8 0.6 0.3 9.7
Cars + 110 846 28 0 984 114 355 405 1 875 13 988 35 2 1038 63 218 18 11 310 3207
% Cars + 99.1 97.4 93.3 0 97.4 97.4 98.9 99.8 100 99.1 100 98 97.2 100 98 98.4 97.8 100 100 98.1 98.1
Trucks 1 23 2 0 26 3 4 1 0 8 0 20 1 0 21 1 5 0 0 6 61
% Trucks 0.9 2.6 6.7 0 2.6 2.6 1.1 0.2 0 0.9 0 2 2.8 0 2 1.6 2.2 0 0 1.9 1.9
File Name : Simpsonville(01 - SC 417 and College Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
SC 417
Southbound
College Street
Westbound
SC 417
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 14 124 5 0 143 13 60 56 0 129 1 139 2 1 143 10 31 1 2 44 459
07:45 AM 14 121 4 0 139 15 54 50 0 119 2 154 2 0 158 15 29 1 1 46 462
08:00 AM 17 137 3 0 157 19 54 44 0 117 1 126 6 0 133 8 33 4 2 47 454
08:15 AM 16 133 7 0 156 17 32 46 0 95 2 133 6 0 141 3 32 6 1 42 434
Total Volume 61 515 19 0 595 64 200 196 0 460 6 552 16 1 575 36 125 12 6 179 1809
% App. Total 10.3 86.6 3.2 0 13.9 43.5 42.6 0 1 96 2.8 0.2 20.1 69.8 6.7 3.4
PHF .897 .940 .679 .000 .947 .842 .833 .875 .000 .891 .750 .896 .667 .250 .910 .600 .947 .500 .750 .952 .979
Cars + 61 498 17 0 576 62 198 195 0 455 6 541 16 1 564 36 122 12 6 176 1771
% Cars + 100 96.7 89.5 0 96.8 96.9 99.0 99.5 0 98.9 100 98.0 100 100 98.1 100 97.6 100 100 98.3 97.9
Trucks 0 17 2 0 19 2 2 1 0 5 0 11 0 0 11 0 3 0 0 3 38
% Trucks 0 3.3 10.5 0 3.2 3.1 1.0 0.5 0 1.1 0 2.0 0 0 1.9 0 2.4 0 0 1.7 2.1
SC 417
College Street
College Street
SC 417
Right
17
2
19
Thru
498
17
515
Left
61
0
61
Peds
0
0
0
InOut Total
772 576 1348
12 19 31
784 1379 595
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
195
1
196
Thru
198
2
200
Left
62
2
64
Peds
0
0
0
OutTotal In
199 455 654
3 5 8
202 662 460
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
6
0
6
Thru
541
11
552
Right
16
0
16
Peds
1
0
1
Out TotalIn
572 564 1136
19 11 30
591 1166 575
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
36
0
36
Thru
122
3
125
Right
12
0
12
Peds
6
0
6
TotalOut In
221 176 397
4 3 7
225 404 179
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 07:30 AM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(01 - SC 417 and College Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
SC 417
Southbound
College Street
Westbound
SC 417
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
04:00 PM 43 174 4 0 221 6 31 34 0 71 4 140 18 0 162 2 42 8 0 52 506
04:15 PM 30 155 7 0 192 11 44 25 0 80 3 129 22 0 154 8 43 9 0 60 486
04:30 PM 24 178 6 0 208 7 36 26 0 69 1 120 11 0 132 7 51 9 0 67 476
04:45 PM 32 145 5 0 182 12 37 28 1 78 3 123 20 0 146 8 42 7 0 57 463
Total 129 652 22 0 803 36 148 113 1 298 11 512 71 0 594 25 178 33 0 236 1931
05:00 PM 37 185 4 0 226 12 43 24 0 79 5 126 19 0 150 10 41 2 0 53 508
05:15 PM 38 146 3 2 189 6 38 23 1 68 2 110 16 0 128 4 51 10 0 65 450
05:30 PM 49 167 7 0 223 10 46 20 0 76 2 97 19 0 118 4 49 10 0 63 480
05:45 PM 53 153 5 0 211 11 31 16 0 58 5 114 24 0 143 2 67 6 0 75 487
Total 177 651 19 2 849 39 158 83 1 281 14 447 78 0 539 20 208 28 0 256 1925
Grand Total 306 1303 41 2 1652 75 306 196 2 579 25 959 149 0 1133 45 386 61 0 492 3856
Apprch % 18.5 78.9 2.5 0.1 13 52.8 33.9 0.3 2.2 84.6 13.2 0 9.1 78.5 12.4 0
Total % 7.9 33.8 1.1 0.1 42.8 1.9 7.9 5.1 0.1 15 0.6 24.9 3.9 0 29.4 1.2 10 1.6 0 12.8
Cars + 306 1296 41 2 1645 74 304 195 2 575 25 949 147 0 1121 45 386 60 0 491 3832
% Cars + 100 99.5 100 100 99.6 98.7 99.3 99.5 100 99.3 100 99 98.7 0 98.9 100 100 98.4 0 99.8 99.4
Trucks 0 7 0 0 7 1 2 1 0 4 0 10 2 0 12 0 0 1 0 1 24
% Trucks 0 0.5 0 0 0.4 1.3 0.7 0.5 0 0.7 0 1 1.3 0 1.1 0 0 1.6 0 0.2 0.6
File Name : Simpsonville(01 - SC 417 and College Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
SC 417
Southbound
College Street
Westbound
SC 417
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:15 PM
04:15 PM 30 155 7 0 192 11 44 25 0 80 3 129 22 0 154 8 43 9 0 60 486
04:30 PM 24 178 6 0 208 7 36 26 0 69 1 120 11 0 132 7 51 9 0 67 476
04:45 PM 32 145 5 0 182 12 37 28 1 78 3 123 20 0 146 8 42 7 0 57 463
05:00 PM 37 185 4 0 226 12 43 24 0 79 5 126 19 0 150 10 41 2 0 53 508
Total Volume 123 663 22 0 808 42 160 103 1 306 12 498 72 0 582 33 177 27 0 237 1933
% App. Total 15.2 82.1 2.7 0 13.7 52.3 33.7 0.3 2.1 85.6 12.4 0 13.9 74.7 11.4 0
PHF .831 .896 .786 .000 .894 .875 .909 .920 .250 .956 .600 .965 .818 .000 .945 .825 .868 .750 .000 .884 .951
Cars + 123 659 22 0 804 41 160 103 1 305 12 493 72 0 577 33 177 27 0 237 1923
% Cars + 100 99.4 100 0 99.5 97.6 100 100 100 99.7 100 99.0 100 0 99.1 100 100 100 0 100 99.5
Trucks 0 4 0 0 4 1 0 0 0 1 0 5 0 0 5 0 0 0 0 0 10
% Trucks 0 0.6 0 0 0.5 2.4 0 0 0 0.3 0 1.0 0 0 0.9 0 0 0 0 0 0.5
SC 417
College Street
College Street
SC 417
Right
22
0
22
Thru
659
4
663
Left
123
0
123
Peds
0
0
0
InOut Total
629 804 1433
5 4 9
634 1442 808
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
103
0
103
Thru
160
0
160
Left
41
1
42
Peds
1
0
1
OutTotal In
372 305 677
0 1 1
372 678 306
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
12
0
12
Thru
493
5
498
Right
72
0
72
Peds
0
0
0
Out TotalIn
727 577 1304
5 5 10
732 1314 582
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
33
0
33
Thru
177
0
177
Right
27
0
27
Peds
0
0
0
TotalOut In
194 237 431
0 0 0
194 431 237
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 04:15 PM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(02 - SC 417 and Curtis Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
SC 417
Southbound
Curtis Street
Westbound
SC 417
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:00 AM 23 61 3 0 87 5 83 30 0 118 8 61 20 0 89 4 43 0 0 47 341
07:15 AM 30 73 2 0 105 9 88 27 1 125 10 102 17 0 129 2 38 1 0 41 400
07:30 AM 33 93 2 1 129 14 55 31 0 100 9 99 13 0 121 5 50 5 0 60 410
07:45 AM 25 103 8 0 136 10 61 43 0 114 3 97 6 0 106 12 44 3 0 59 415
Total 111 330 15 1 457 38 287 131 1 457 30 359 56 0 445 23 175 9 0 207 1566
08:00 AM 36 122 6 0 164 12 69 24 0 105 3 100 9 0 112 6 48 4 0 58 439
08:15 AM 24 124 5 0 153 15 50 24 0 89 7 114 15 0 136 2 47 1 0 50 428
08:30 AM 25 85 6 0 116 15 64 20 0 99 13 113 10 1 137 1 38 3 0 42 394
08:45 AM 28 79 6 0 113 15 54 16 0 85 6 100 6 1 113 10 40 6 0 56 367
Total 113 410 23 0 546 57 237 84 0 378 29 427 40 2 498 19 173 14 0 206 1628
Grand Total 224 740 38 1 1003 95 524 215 1 835 59 786 96 2 943 42 348 23 0 413 3194
Apprch % 22.3 73.8 3.8 0.1 11.4 62.8 25.7 0.1 6.3 83.4 10.2 0.2 10.2 84.3 5.6 0
Total % 7 23.2 1.2 0 31.4 3 16.4 6.7 0 26.1 1.8 24.6 3 0.1 29.5 1.3 10.9 0.7 0 12.9
Cars + 216 724 36 1 977 83 505 211 1 800 58 769 93 2 922 42 330 23 0 395 3094
% Cars + 96.4 97.8 94.7 100 97.4 87.4 96.4 98.1 100 95.8 98.3 97.8 96.9 100 97.8 100 94.8 100 0 95.6 96.9
Trucks 8 16 2 0 26 12 19 4 0 35 1 17 3 0 21 0 18 0 0 18 100
% Trucks 3.6 2.2 5.3 0 2.6 12.6 3.6 1.9 0 4.2 1.7 2.2 3.1 0 2.2 0 5.2 0 0 4.4 3.1
File Name : Simpsonville(02 - SC 417 and Curtis Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
SC 417
Southbound
Curtis Street
Westbound
SC 417
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 33 93 2 1 129 14 55 31 0 100 9 99 13 0 121 5 50 5 0 60 410
07:45 AM 25 103 8 0 136 10 61 43 0 114 3 97 6 0 106 12 44 3 0 59 415
08:00 AM 36 122 6 0 164 12 69 24 0 105 3 100 9 0 112 6 48 4 0 58 439
08:15 AM 24 124 5 0 153 15 50 24 0 89 7 114 15 0 136 2 47 1 0 50 428
Total Volume 118 442 21 1 582 51 235 122 0 408 22 410 43 0 475 25 189 13 0 227 1692
% App. Total 20.3 75.9 3.6 0.2 12.5 57.6 29.9 0 4.6 86.3 9.1 0 11 83.3 5.7 0
PHF .819 .891 .656 .250 .887 .850 .851 .709 .000 .895 .611 .899 .717 .000 .873 .521 .945 .650 .000 .946 .964
Cars + 113 429 21 1 564 45 224 119 0 388 21 402 41 0 464 25 179 13 0 217 1633
% Cars + 95.8 97.1 100 100 96.9 88.2 95.3 97.5 0 95.1 95.5 98.0 95.3 0 97.7 100 94.7 100 0 95.6 96.5
Trucks 5 13 0 0 18 6 11 3 0 20 1 8 2 0 11 0 10 0 0 10 59
% Trucks 4.2 2.9 0 0 3.1 11.8 4.7 2.5 0 4.9 4.5 2.0 4.7 0 2.3 0 5.3 0 0 4.4 3.5
SC 417
Curtis Street
Curtis Street
SC 417
Right
21
0
21
Thru
429
13
442
Left
113
5
118
Peds
1
0
1
InOut Total
546 564 1110
11 18 29
557 1139 582
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
119
3
122
Thru
224
11
235
Left
45
6
51
Peds
0
0
0
OutTotal In
333 388 721
17 20 37
350 758 408
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
21
1
22
Thru
402
8
410
Right
41
2
43
Peds
0
0
0
Out TotalIn
487 464 951
19 11 30
506 981 475
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
25
0
25
Thru
179
10
189
Right
13
0
13
Peds
0
0
0
TotalOut In
266 217 483
12 10 22
278 505 227
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 07:30 AM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(02 - SC 417 and Curtis Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
SC 417
Southbound
Curtis Street
Westbound
SC 417
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
04:00 PM 44 130 12 0 186 12 33 21 0 66 15 135 29 4 183 8 41 3 0 52 487
04:15 PM 53 120 7 0 180 4 52 16 0 72 10 127 25 1 163 3 55 6 0 64 479
04:30 PM 61 118 7 0 186 10 47 27 0 84 8 111 19 6 144 7 50 1 0 58 472
04:45 PM 52 101 11 0 164 15 37 15 3 70 10 125 26 0 161 4 47 11 0 62 457
Total 210 469 37 0 716 41 169 79 3 292 43 498 99 11 651 22 193 21 0 236 1895
05:00 PM 47 135 12 0 194 5 48 22 0 75 12 120 27 1 160 4 58 4 0 66 495
05:15 PM 47 101 8 0 156 11 40 9 1 61 12 113 39 5 169 3 65 5 0 73 459
05:30 PM 56 124 19 2 201 8 50 6 2 66 12 102 37 0 151 3 64 3 0 70 488
05:45 PM 41 105 12 0 158 6 52 17 5 80 8 121 33 5 167 6 65 9 0 80 485
Total 191 465 51 2 709 30 190 54 8 282 44 456 136 11 647 16 252 21 0 289 1927
Grand Total 401 934 88 2 1425 71 359 133 11 574 87 954 235 22 1298 38 445 42 0 525 3822
Apprch % 28.1 65.5 6.2 0.1 12.4 62.5 23.2 1.9 6.7 73.5 18.1 1.7 7.2 84.8 8 0
Total % 10.5 24.4 2.3 0.1 37.3 1.9 9.4 3.5 0.3 15 2.3 25 6.1 0.6 34 1 11.6 1.1 0 13.7
Cars + 398 928 88 2 1416 69 350 131 10 560 86 944 230 20 1280 38 437 42 0 517 3773
% Cars + 99.3 99.4 100 100 99.4 97.2 97.5 98.5 90.9 97.6 98.9 99 97.9 90.9 98.6 100 98.2 100 0 98.5 98.7
Trucks 3 6 0 0 9 2 9 2 1 14 1 10 5 2 18 0 8 0 0 8 49
% Trucks 0.7 0.6 0 0 0.6 2.8 2.5 1.5 9.1 2.4 1.1 1 2.1 9.1 1.4 0 1.8 0 0 1.5 1.3
File Name : Simpsonville(02 - SC 417 and Curtis Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
SC 417
Southbound
Curtis Street
Westbound
SC 417
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM
05:00 PM 47 135 12 0 194 5 48 22 0 75 12 120 27 1 160 4 58 4 0 66 495
05:15 PM 47 101 8 0 156 11 40 9 1 61 12 113 39 5 169 3 65 5 0 73 459
05:30 PM 56 124 19 2 201 8 50 6 2 66 12 102 37 0 151 3 64 3 0 70 488
05:45 PM 41 105 12 0 158 6 52 17 5 80 8 121 33 5 167 6 65 9 0 80 485
Total Volume 191 465 51 2 709 30 190 54 8 282 44 456 136 11 647 16 252 21 0 289 1927
% App. Total 26.9 65.6 7.2 0.3 10.6 67.4 19.1 2.8 6.8 70.5 21 1.7 5.5 87.2 7.3 0
PHF .853 .861 .671 .250 .882 .682 .913 .614 .400 .881 .917 .942 .872 .550 .957 .667 .969 .583 .000 .903 .973
Cars + 189 463 51 2 705 30 185 52 7 274 43 453 135 9 640 16 248 21 0 285 1904
% Cars + 99.0 99.6 100 100 99.4 100 97.4 96.3 87.5 97.2 97.7 99.3 99.3 81.8 98.9 100 98.4 100 0 98.6 98.8
Trucks 2 2 0 0 4 0 5 2 1 8 1 3 1 2 7 0 4 0 0 4 23
% Trucks 1.0 0.4 0 0 0.6 0 2.6 3.7 12.5 2.8 2.3 0.7 0.7 18.2 1.1 0 1.6 0 0 1.4 1.2
SC 417
Curtis Street
Curtis Street
SC 417
Right
51
0
51
Thru
463
2
465
Left
189
2
191
Peds
2
0
2
InOut Total
521 705 1226
5 4 9
526 1235 709
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
52
2
54
Thru
185
5
190
Left
30
0
30
Peds
7
1
8
OutTotal In
572 274 846
7 8 15
579 861 282
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
43
1
44
Thru
453
3
456
Right
135
1
136
Peds
9
2
11
Out TotalIn
514 640 1154
2 7 9
516 1163 647
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
16
0
16
Thru
248
4
252
Right
21
0
21
Peds
0
0
0
TotalOut In
279 285 564
6 4 10
285 574 289
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 05:00 PM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(03 - W. College Street and Main Street (DC)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Main Street
Southbound
College Street
Westbound
Main Street
Northbound
College Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
07:00 AM 0 0 0 0 0 0 1 1 0 0 0 0 1 0 0 1 2
07:15 AM 0 0 1 1 0 0 3 3 0 0 0 0 0 0 0 0 4
07:30 AM 0 0 1 1 0 0 1 1 0 0 0 0 1 0 0 1 3
07:45 AM 0 0 3 3 2 0 1 3 0 0 2 2 0 0 0 0 8
Total 0 0 5 5 2 0 6 8 0 0 2 2 2 0 0 2 17
08:00 AM 1 0 3 4 0 0 1 1 0 0 2 2 0 0 0 0 7
08:15 AM 0 0 6 6 0 0 2 2 0 0 0 0 3 0 0 3 11
08:30 AM 0 0 3 3 4 0 3 7 0 0 1 1 1 0 0 1 12
08:45 AM 0 0 9 9 0 0 3 3 0 0 4 4 1 0 1 2 18
Total 1 0 21 22 4 0 9 13 0 0 7 7 5 0 1 6 48
Grand Total 1 0 26 27 6 0 15 21 0 0 9 9 7 0 1 8 65
Apprch % 3.7 0 96.3 28.6 0 71.4 0 0 100 87.5 0 12.5
Total % 1.5 0 40 41.5 9.2 0 23.1 32.3 0 0 13.8 13.8 10.8 0 1.5 12.3
Cars + 1 0 25 26 6 0 15 21 0 0 9 9 7 0 1 8 64
% Cars + 100 0 96.2 96.3 100 0 100 100 0 0 100 100 100 0 100 100 98.5
Trucks 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1
% Trucks 0 0 3.8 3.7 0 0 0 0 0 0 0 0 0 0 0 0 1.5
File Name : Simpsonville(03 - W. College Street and Main Street (DC)
Site Code :
Start Date : 9/24/2025
Page No : 2
Main Street
Southbound
College Street
Westbound
Main Street
Northbound
College Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 1 0 3 4 0 0 1 1 0 0 2 2 0 0 0 0 7
08:15 AM 0 0 6 6 0 0 2 2 0 0 0 0 3 0 0 3 11
08:30 AM 0 0 3 3 4 0 3 7 0 0 1 1 1 0 0 1 12
08:45 AM 0 0 9 9 0 0 3 3 0 0 4 4 1 0 1 2 18
Total Volume 1 0 21 22 4 0 9 13 0 0 7 7 5 0 1 6 48
% App. Total 4.5 0 95.5 30.8 0 69.2 0 0 100 83.3 0 16.7
PHF .250 .000 .583 .611 .250 .000 .750 .464 .000 .000 .438 .438 .417 .000 .250 .500 .667
Main Street
College Street
College Street
Main Street
Right
21
Thru
0
Left
1
InOut Total
14 22 36
Right
9
Thru
0
Left
4
OutTotal In
8 13 21
Left
0
Thru
0
Right
7
Out TotalIn
5 7 12
Left
5
Thru
0
Right
1
TotalOut In
21 6 27
Peak Hour Begins at 08:00 AM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(03 - W. College Street and Main Street (DC)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Main Street
Southbound
College Street
Westbound
Main Street
Northbound
College Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
04:00 PM 1 0 4 5 0 0 1 1 1 0 3 4 0 0 2 2 12
04:15 PM 0 0 4 4 2 0 2 4 0 0 3 3 0 0 0 0 11
04:30 PM 5 0 7 12 4 0 2 6 1 0 4 5 0 0 1 1 24
04:45 PM 2 0 6 8 6 0 0 6 2 0 0 2 0 0 0 0 16
Total 8 0 21 29 12 0 5 17 4 0 10 14 0 0 3 3 63
05:00 PM 0 0 8 8 2 0 2 4 1 0 0 1 2 0 0 2 15
05:15 PM 7 0 7 14 3 0 0 3 0 0 2 2 1 0 1 2 21
05:30 PM 5 0 3 8 5 0 1 6 1 0 1 2 0 0 0 0 16
05:45 PM 2 0 0 2 4 0 0 4 4 0 3 7 0 0 0 0 13
Total 14 0 18 32 14 0 3 17 6 0 6 12 3 0 1 4 65
Grand Total 22 0 39 61 26 0 8 34 10 0 16 26 3 0 4 7 128
Apprch % 36.1 0 63.9 76.5 0 23.5 38.5 0 61.5 42.9 0 57.1
Total % 17.2 0 30.5 47.7 20.3 0 6.2 26.6 7.8 0 12.5 20.3 2.3 0 3.1 5.5
Cars + 21 0 39 60 26 0 8 34 10 0 16 26 3 0 4 7 127
% Cars + 95.5 0 100 98.4 100 0 100 100 100 0 100 100 100 0 100 100 99.2
Trucks 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1
% Trucks 4.5 0 0 1.6 0 0 0 0 0 0 0 0 0 0 0 0 0.8
File Name : Simpsonville(03 - W. College Street and Main Street (DC)
Site Code :
Start Date : 9/24/2025
Page No : 2
Main Street
Southbound
College Street
Westbound
Main Street
Northbound
College Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 04:30 PM
04:30 PM 5 0 7 12 4 0 2 6 1 0 4 5 0 0 1 1 24
04:45 PM 2 0 6 8 6 0 0 6 2 0 0 2 0 0 0 0 16
05:00 PM 0 0 8 8 2 0 2 4 1 0 0 1 2 0 0 2 15
05:15 PM 7 0 7 14 3 0 0 3 0 0 2 2 1 0 1 2 21
Total Volume 14 0 28 42 15 0 4 19 4 0 6 10 3 0 2 5 76
% App. Total 33.3 0 66.7 78.9 0 21.1 40 0 60 60 0 40
PHF .500 .000 .875 .750 .625 .000 .500 .792 .500 .000 .375 .500 .375 .000 .500 .625 .792
Main Street
College Street
College Street
Main Street
Right
28
Thru
0
Left
14
InOut Total
7 42 49
Right
4
Thru
0
Left
15
OutTotal In
20 19 39
Left
4
Thru
0
Right
6
Out TotalIn
17 10 27
Left
3
Thru
0
Right
2
TotalOut In
32 5 37
Peak Hour Begins at 04:30 PM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Main Street
Southbound
Curtis Street
Westbound
Main Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
07:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 1 2
07:15 AM 0 0 3 3 1 0 0 1 4 0 0 4 0 0 0 0 8
07:30 AM 0 0 0 0 0 0 1 1 4 0 4 8 0 0 0 0 9
07:45 AM 2 0 5 7 1 0 1 2 5 0 1 6 1 0 2 3 18
Total 2 0 8 10 2 0 2 4 14 0 5 19 1 0 3 4 37
08:00 AM 0 0 5 5 4 0 0 4 2 0 3 5 0 0 4 4 18
08:15 AM 0 0 2 2 2 0 1 3 2 0 0 2 0 0 1 1 8
08:30 AM 0 0 6 6 3 0 2 5 2 0 0 2 1 0 4 5 18
08:45 AM 1 0 3 4 4 0 5 9 8 0 9 17 0 0 2 2 32
Total 1 0 16 17 13 0 8 21 14 0 12 26 1 0 11 12 76
Grand Total 3 0 24 27 15 0 10 25 28 0 17 45 2 0 14 16 113
Apprch % 11.1 0 88.9 60 0 40 62.2 0 37.8 12.5 0 87.5
Total % 2.7 0 21.2 23.9 13.3 0 8.8 22.1 24.8 0 15 39.8 1.8 0 12.4 14.2
Cars + 3 0 23 26 15 0 10 25 28 0 17 45 2 0 14 16 112
% Cars + 100 0 95.8 96.3 100 0 100 100 100 0 100 100 100 0 100 100 99.1
Trucks 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1
% Trucks 0 0 4.2 3.7 0 0 0 0 0 0 0 0 0 0 0 0 0.9
File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1)
Site Code :
Start Date : 9/24/2025
Page No : 2
Main Street
Southbound
Curtis Street
Westbound
Main Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00 AM
08:00 AM 0 0 5 5 4 0 0 4 2 0 3 5 0 0 4 4 18
08:15 AM 0 0 2 2 2 0 1 3 2 0 0 2 0 0 1 1 8
08:30 AM 0 0 6 6 3 0 2 5 2 0 0 2 1 0 4 5 18
08:45 AM 1 0 3 4 4 0 5 9 8 0 9 17 0 0 2 2 32
Total Volume 1 0 16 17 13 0 8 21 14 0 12 26 1 0 11 12 76
% App. Total 5.9 0 94.1 61.9 0 38.1 53.8 0 46.2 8.3 0 91.7
PHF .250 .000 .667 .708 .813 .000 .400 .583 .438 .000 .333 .382 .250 .000 .688 .600 .594
Main Street
Curtis Street
Curtis Street
Main Street
Right
16
Thru
0
Left
1
InOut Total
9 17 26
Right
8
Thru
0
Left
13
OutTotal In
13 21 34
Left
14
Thru
0
Right
12
Out TotalIn
24 26 50
Left
1
Thru
0
Right
11
TotalOut In
30 12 42
Peak Hour Begins at 08:00 AM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Main Street
Southbound
Curtis Street
Westbound
Main Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
04:00 PM 1 0 7 8 5 0 2 7 6 0 3 9 1 0 1 2 26
04:15 PM 1 0 9 10 8 0 1 9 6 0 4 10 0 0 0 0 29
04:30 PM 4 0 5 9 9 0 3 12 1 0 3 4 0 0 1 1 26
04:45 PM 2 0 5 7 11 0 4 15 1 0 5 6 2 0 5 7 35
Total 8 0 26 34 33 0 10 43 14 0 15 29 3 0 7 10 116
05:00 PM 2 0 3 5 6 0 2 8 2 0 5 7 0 0 2 2 22
05:15 PM 0 0 10 10 6 0 4 10 1 0 4 5 3 0 0 3 28
05:30 PM 6 0 9 15 9 0 2 11 1 0 3 4 1 0 0 1 31
05:45 PM 3 0 7 10 10 0 2 12 5 0 11 16 0 0 0 0 38
Total 11 0 29 40 31 0 10 41 9 0 23 32 4 0 2 6 119
Grand Total 19 0 55 74 64 0 20 84 23 0 38 61 7 0 9 16 235
Apprch % 25.7 0 74.3 76.2 0 23.8 37.7 0 62.3 43.8 0 56.2
Total % 8.1 0 23.4 31.5 27.2 0 8.5 35.7 9.8 0 16.2 26 3 0 3.8 6.8
Cars + 19 0 55 74 64 0 20 84 23 0 38 61 7 0 8 15 234
% Cars + 100 0 100 100 100 0 100 100 100 0 100 100 100 0 88.9 93.8 99.6
Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1
% Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.1 6.2 0.4
File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1)
Site Code :
Start Date : 9/24/2025
Page No : 2
Main Street
Southbound
Curtis Street
Westbound
Main Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM
05:00 PM 2 0 3 5 6 0 2 8 2 0 5 7 0 0 2 2 22
05:15 PM 0 0 10 10 6 0 4 10 1 0 4 5 3 0 0 3 28
05:30 PM 6 0 9 15 9 0 2 11 1 0 3 4 1 0 0 1 31
05:45 PM 3 0 7 10 10 0 2 12 5 0 11 16 0 0 0 0 38
Total Volume 11 0 29 40 31 0 10 41 9 0 23 32 4 0 2 6 119
% App. Total 27.5 0 72.5 75.6 0 24.4 28.1 0 71.9 66.7 0 33.3
PHF .458 .000 .725 .667 .775 .000 .625 .854 .450 .000 .523 .500 .333 .000 .250 .500 .783
Main Street
Curtis Street
Curtis Street
Main Street
Right
29
Thru
0
Left
11
InOut Total
14 40 54
Right
10
Thru
0
Left
31
OutTotal In
34 41 75
Left
9
Thru
0
Right
23
Out TotalIn
33 32 65
Left
4
Thru
0
Right
2
TotalOut In
38 6 44
Peak Hour Begins at 05:00 PM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(05 - College St and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Commercial Access
Southbound
College Street
Westbound
Hedge Street
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:00 AM 0 0 0 0 0 6 117 0 0 123 4 0 5 1 10 0 22 6 0 28 161
07:15 AM 0 0 0 0 0 9 130 0 0 139 2 0 8 0 10 1 34 10 0 45 194
07:30 AM 0 0 0 0 0 9 129 0 0 138 0 0 10 1 11 0 31 16 0 47 196
07:45 AM 0 0 0 0 0 19 116 0 0 135 4 0 18 0 22 0 35 10 0 45 202
Total 0 0 0 0 0 43 492 0 0 535 10 0 41 2 53 1 122 42 0 165 753
08:00 AM 0 0 0 0 0 27 107 0 0 134 6 0 16 0 22 0 48 8 0 56 212
08:15 AM 0 0 0 0 0 62 90 0 0 152 2 0 10 0 12 1 39 13 0 53 217
08:30 AM 0 0 0 0 0 18 82 0 0 100 6 0 19 0 25 0 35 10 0 45 170
08:45 AM 0 0 0 0 0 10 83 0 0 93 7 1 11 0 19 1 29 19 0 49 161
Total 0 0 0 0 0 117 362 0 0 479 21 1 56 0 78 2 151 50 0 203 760
Grand Total 0 0 0 0 0 160 854 0 0 1014 31 1 97 2 131 3 273 92 0 368 1513
Apprch % 0 0 0 0 15.8 84.2 0 0 23.7 0.8 74 1.5 0.8 74.2 25 0
Total % 0 0 0 0 0 10.6 56.4 0 0 67 2 0.1 6.4 0.1 8.7 0.2 18 6.1 0 24.3
Cars + 0 0 0 0 0 160 846 0 0 1006 31 1 97 2 131 3 266 92 0 361 1498
% Cars + 0 0 0 0 0 100 99.1 0 0 99.2 100 100 100 100 100 100 97.4 100 0 98.1 99
Trucks 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 7 0 0 7 15
% Trucks 0 0 0 0 0 0 0.9 0 0 0.8 0 0 0 0 0 0 2.6 0 0 1.9 1
File Name : Simpsonville(05 - College St and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
Commercial Access
Southbound
College Street
Westbound
Hedge Street
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:30 AM
07:30 AM 0 0 0 0 0 9 129 0 0 138 0 0 10 1 11 0 31 16 0 47 196
07:45 AM 0 0 0 0 0 19 116 0 0 135 4 0 18 0 22 0 35 10 0 45 202
08:00 AM 0 0 0 0 0 27 107 0 0 134 6 0 16 0 22 0 48 8 0 56 212
08:15 AM 0 0 0 0 0 62 90 0 0 152 2 0 10 0 12 1 39 13 0 53 217
Total Volume 0 0 0 0 0 117 442 0 0 559 12 0 54 1 67 1 153 47 0 201 827
% App. Total 0 0 0 0 20.9 79.1 0 0 17.9 0 80.6 1.5 0.5 76.1 23.4 0
PHF .000 .000 .000 .000 .000 .472 .857 .000 .000 .919 .500 .000 .750 .250 .761 .250 .797 .734 .000 .897 .953
Cars + 0 0 0 0 0 117 437 0 0 554 12 0 54 1 67 1 150 47 0 198 819
% Cars + 0 0 0 0 0 100 98.9 0 0 99.1 100 0 100 100 100 100 98.0 100 0 98.5 99.0
Trucks 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 3 0 0 3 8
% Trucks 0 0 0 0 0 0 1.1 0 0 0.9 0 0 0 0 0 0 2.0 0 0 1.5 1.0
Commercial Access
College Street
College Street
Hedge Street
Right
0
0
0
Thru
0
0
0
Left
0
0
0
Peds
0
0
0
InOut Total
1 0 1
0 0 0
1 1 0
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
0
0
0
Thru
437
5
442
Left
117
0
117
Peds
0
0
0
OutTotal In
204 554 758
3 5 8
207 766 559
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
12
0
12
Thru
0
0
0
Right
54
0
54
Peds
1
0
1
Out TotalIn
164 67 231
0 0 0
164 231 67
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
1
0
1
Thru
150
3
153
Right
47
0
47
Peds
0
0
0
TotalOut In
449 198 647
5 3 8
454 655 201
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 07:30 AM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(05 - College St and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Commercial Access
Southbound
College Street
Westbound
Hedge Street
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
04:00 PM 0 0 1 0 1 10 54 0 0 64 12 0 24 0 36 0 69 31 0 100 201
04:15 PM 0 0 1 0 1 16 80 0 0 96 5 0 14 0 19 1 60 34 0 95 211
04:30 PM 0 0 0 0 0 9 67 0 0 76 1 0 9 0 10 0 69 18 0 87 173
04:45 PM 0 0 0 0 0 17 73 0 0 90 3 0 15 0 18 1 67 23 0 91 199
Total 0 0 2 0 2 52 274 0 0 326 21 0 62 0 83 2 265 106 0 373 784
05:00 PM 0 0 3 0 3 8 77 0 0 85 0 0 19 0 19 0 70 28 0 98 205
05:15 PM 0 0 0 2 2 14 59 0 0 73 7 0 13 0 20 1 74 31 0 106 201
05:30 PM 0 0 1 0 1 11 74 0 0 85 1 0 16 0 17 1 78 35 0 114 217
05:45 PM 0 0 2 0 2 11 58 3 0 72 1 0 8 0 9 0 109 39 0 148 231
Total 0 0 6 2 8 44 268 3 0 315 9 0 56 0 65 2 331 133 0 466 854
Grand Total 0 0 8 2 10 96 542 3 0 641 30 0 118 0 148 4 596 239 0 839 1638
Apprch % 0 0 80 20 15 84.6 0.5 0 20.3 0 79.7 0 0.5 71 28.5 0
Total % 0 0 0.5 0.1 0.6 5.9 33.1 0.2 0 39.1 1.8 0 7.2 0 9 0.2 36.4 14.6 0 51.2
Cars + 0 0 8 2 10 96 538 3 0 637 30 0 118 0 148 4 595 238 0 837 1632
% Cars + 0 0 100 100 100 100 99.3 100 0 99.4 100 0 100 0 100 100 99.8 99.6 0 99.8 99.6
Trucks 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 1 0 2 6
% Trucks 0 0 0 0 0 0 0.7 0 0 0.6 0 0 0 0 0 0 0.2 0.4 0 0.2 0.4
File Name : Simpsonville(05 - College St and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
Commercial Access
Southbound
College Street
Westbound
Hedge Street
Northbound
College Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM
05:00 PM 0 0 3 0 3 8 77 0 0 85 0 0 19 0 19 0 70 28 0 98 205
05:15 PM 0 0 0 2 2 14 59 0 0 73 7 0 13 0 20 1 74 31 0 106 201
05:30 PM 0 0 1 0 1 11 74 0 0 85 1 0 16 0 17 1 78 35 0 114 217
05:45 PM 0 0 2 0 2 11 58 3 0 72 1 0 8 0 9 0 109 39 0 148 231
Total Volume 0 0 6 2 8 44 268 3 0 315 9 0 56 0 65 2 331 133 0 466 854
% App. Total 0 0 75 25 14 85.1 1 0 13.8 0 86.2 0 0.4 71 28.5 0
PHF .000 .000 .500 .250 .667 .786 .870 .250 .000 .926 .321 .000 .737 .000 .813 .500 .759 .853 .000 .787 .924
Cars + 0 0 6 2 8 44 266 3 0 313 9 0 56 0 65 2 331 133 0 466 852
% Cars + 0 0 100 100 100 100 99.3 100 0 99.4 100 0 100 0 100 100 100 100 0 100 99.8
Trucks 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2
% Trucks 0 0 0 0 0 0 0.7 0 0 0.6 0 0 0 0 0 0 0 0 0 0 0.2
Commercial Access
College Street
College Street
Hedge Street
Right
6
0
6
Thru
0
0
0
Left
0
0
0
Peds
2
0
2
InOut Total
5 8 13
0 0 0
5 13 8
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
3
0
3
Thru
266
2
268
Left
44
0
44
Peds
0
0
0
OutTotal In
387 313 700
0 2 2
387 702 315
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
9
0
9
Thru
0
0
0
Right
56
0
56
Peds
0
0
0
Out TotalIn
177 65 242
0 0 0
177 242 65
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
2
0
2
Thru
331
0
331
Right
133
0
133
Peds
0
0
0
TotalOut In
281 466 747
2 0 2
283 749 466
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 05:00 PM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(06 - Curtis Street and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Hedge Street
Southbound
Curtis Street
Westbound
Hedge Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
07:00 AM 5 5 1 0 11 2 121 3 0 126 0 5 14 0 19 1 83 0 0 84 240
07:15 AM 9 6 1 0 16 4 119 1 0 124 0 9 18 0 27 1 81 1 0 83 250
07:30 AM 10 11 0 1 22 12 103 4 0 119 0 12 25 0 37 0 96 1 0 97 275
07:45 AM 14 25 2 0 41 14 109 5 0 128 2 17 30 0 49 2 70 3 0 75 293
Total 38 47 4 1 90 32 452 13 0 497 2 43 87 0 132 4 330 5 0 339 1058
08:00 AM 6 29 1 0 36 16 100 2 1 119 1 21 32 0 54 1 90 1 0 92 301
08:15 AM 7 66 1 0 74 24 91 3 1 119 0 10 25 0 35 0 87 0 0 87 315
08:30 AM 8 25 0 0 33 18 97 2 0 117 4 25 42 0 71 1 72 0 1 74 295
08:45 AM 7 13 4 0 24 16 79 2 0 97 5 19 29 0 53 4 67 1 0 72 246
Total 28 133 6 0 167 74 367 9 2 452 10 75 128 0 213 6 316 2 1 325 1157
Grand Total 66 180 10 1 257 106 819 22 2 949 12 118 215 0 345 10 646 7 1 664 2215
Apprch % 25.7 70 3.9 0.4 11.2 86.3 2.3 0.2 3.5 34.2 62.3 0 1.5 97.3 1.1 0.2
Total % 3 8.1 0.5 0 11.6 4.8 37 1 0.1 42.8 0.5 5.3 9.7 0 15.6 0.5 29.2 0.3 0 30
Cars + 66 180 10 1 257 106 784 22 1 913 11 118 211 0 340 10 617 7 1 635 2145
% Cars + 100 100 100 100 100 100 95.7 100 50 96.2 91.7 100 98.1 0 98.6 100 95.5 100 100 95.6 96.8
Trucks 0 0 0 0 0 0 35 0 1 36 1 0 4 0 5 0 29 0 0 29 70
% Trucks 0 0 0 0 0 0 4.3 0 50 3.8 8.3 0 1.9 0 1.4 0 4.5 0 0 4.4 3.2
File Name : Simpsonville(06 - Curtis Street and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
Hedge Street
Southbound
Curtis Street
Westbound
Hedge Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45 AM
07:45 AM 14 25 2 0 41 14 109 5 0 128 2 17 30 0 49 2 70 3 0 75 293
08:00 AM 6 29 1 0 36 16 100 2 1 119 1 21 32 0 54 1 90 1 0 92 301
08:15 AM 7 66 1 0 74 24 91 3 1 119 0 10 25 0 35 0 87 0 0 87 315
08:30 AM 8 25 0 0 33 18 97 2 0 117 4 25 42 0 71 1 72 0 1 74 295
Total Volume 35 145 4 0 184 72 397 12 2 483 7 73 129 0 209 4 319 4 1 328 1204
% App. Total 19 78.8 2.2 0 14.9 82.2 2.5 0.4 3.3 34.9 61.7 0 1.2 97.3 1.2 0.3
PHF .625 .549 .500 .000 .622 .750 .911 .600 .500 .943 .438 .730 .768 .000 .736 .500 .886 .333 .250 .891 .956
Cars + 35 145 4 0 184 72 376 12 1 461 7 73 126 0 206 4 300 4 1 309 1160
% Cars + 100 100 100 0 100 100 94.7 100 50.0 95.4 100 100 97.7 0 98.6 100 94.0 100 100 94.2 96.3
Trucks 0 0 0 0 0 0 21 0 1 22 0 0 3 0 3 0 19 0 0 19 44
% Trucks 0 0 0 0 0 0 5.3 0 50.0 4.6 0 0 2.3 0 1.4 0 6.0 0 0 5.8 3.7
Hedge Street
Curtis Street
Curtis Street
Hedge Street
Right
4
0
4
Thru
145
0
145
Left
35
0
35
Peds
0
0
0
InOut Total
89 184 273
0 0 0
89 273 184
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
12
0
12
Thru
376
21
397
Left
72
0
72
Peds
1
1
2
OutTotal In
461 461 922
22 22 44
483 966 483
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
7
0
7
Thru
73
0
73
Right
126
3
129
Peds
0
0
0
Out TotalIn
221 206 427
0 3 3
221 430 209
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
4
0
4
Thru
300
19
319
Right
4
0
4
Peds
1
0
1
TotalOut In
387 309 696
21 19 40
408 736 328
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 07:45 AM
Cars +
Trucks
Peak Hour Data
North
File Name : Simpsonville(06 - Curtis Street and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 1
Groups Printed- Cars + - Trucks
Hedge Street
Southbound
Curtis Street
Westbound
Hedge Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
04:00 PM 23 12 0 0 35 10 65 3 0 78 0 23 44 0 67 2 113 2 0 117 297
04:15 PM 41 16 0 0 57 15 70 2 0 87 2 15 34 0 51 4 122 5 0 131 326
04:30 PM 16 12 2 0 30 14 70 1 0 85 3 10 50 1 64 1 134 2 0 137 316
04:45 PM 22 16 3 0 41 11 55 1 0 67 2 16 45 0 63 4 104 4 0 112 283
Total 102 56 5 0 163 50 260 7 0 317 7 64 173 1 245 11 473 13 0 497 1222
05:00 PM 26 12 1 0 39 21 75 1 0 97 1 13 47 0 61 2 127 4 4 137 334
05:15 PM 32 21 1 2 56 14 66 5 0 85 2 22 60 1 85 4 145 1 2 152 378
05:30 PM 29 13 1 0 43 21 64 1 0 86 0 23 52 0 75 3 143 6 0 152 356
05:45 PM 20 21 3 0 44 19 70 4 0 93 2 20 50 0 72 7 127 0 2 136 345
Total 107 67 6 2 182 75 275 11 0 361 5 78 209 1 293 16 542 11 8 577 1413
Grand Total 209 123 11 2 345 125 535 18 0 678 12 142 382 2 538 27 1015 24 8 1074 2635
Apprch % 60.6 35.7 3.2 0.6 18.4 78.9 2.7 0 2.2 26.4 71 0.4 2.5 94.5 2.2 0.7
Total % 7.9 4.7 0.4 0.1 13.1 4.7 20.3 0.7 0 25.7 0.5 5.4 14.5 0.1 20.4 1 38.5 0.9 0.3 40.8
Cars + 209 123 11 2 345 125 521 18 0 664 12 142 379 0 533 27 999 24 8 1058 2600
% Cars + 100 100 100 100 100 100 97.4 100 0 97.9 100 100 99.2 0 99.1 100 98.4 100 100 98.5 98.7
Trucks 0 0 0 0 0 0 14 0 0 14 0 0 3 2 5 0 16 0 0 16 35
% Trucks 0 0 0 0 0 0 2.6 0 0 2.1 0 0 0.8 100 0.9 0 1.6 0 0 1.5 1.3
File Name : Simpsonville(06 - Curtis Street and Hedge Street)
Site Code :
Start Date : 9/24/2025
Page No : 2
Hedge Street
Southbound
Curtis Street
Westbound
Hedge Street
Northbound
Curtis Street
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 05:00 PM
05:00 PM 26 12 1 0 39 21 75 1 0 97 1 13 47 0 61 2 127 4 4 137 334
05:15 PM 32 21 1 2 56 14 66 5 0 85 2 22 60 1 85 4 145 1 2 152 378
05:30 PM 29 13 1 0 43 21 64 1 0 86 0 23 52 0 75 3 143 6 0 152 356
05:45 PM 20 21 3 0 44 19 70 4 0 93 2 20 50 0 72 7 127 0 2 136 345
Total Volume 107 67 6 2 182 75 275 11 0 361 5 78 209 1 293 16 542 11 8 577 1413
% App. Total 58.8 36.8 3.3 1.1 20.8 76.2 3 0 1.7 26.6 71.3 0.3 2.8 93.9 1.9 1.4
PHF .836 .798 .500 .250 .813 .893 .917 .550 .000 .930 .625 .848 .871 .250 .862 .571 .934 .458 .500 .949 .935
Cars + 107 67 6 2 182 75 266 11 0 352 5 78 208 0 291 16 535 11 8 570 1395
% Cars + 100 100 100 100 100 100 96.7 100 0 97.5 100 100 99.5 0 99.3 100 98.7 100 100 98.8 98.7
Trucks 0 0 0 0 0 0 9 0 0 9 0 0 1 1 2 0 7 0 0 7 18
% Trucks 0 0 0 0 0 0 3.3 0 0 2.5 0 0 0.5 100 0.7 0 1.3 0 0 1.2 1.3
Hedge Street
Curtis Street
Curtis Street
Hedge Street
Right
6
0
6
Thru
67
0
67
Left
107
0
107
Peds
2
0
2
InOut Total
105 182 287
0 0 0
105 287 182
Out
0 0 0 In
0 0 0 Total
0
0 0
Right
11
0
11
Thru
266
9
275
Left
75
0
75
Peds
0
0
0
OutTotal In
850 352 1202
8 9 17
858 1219 361
Out
0 0
0
In
0 0 0
Total
0
0 0 Left
5
0
5
Thru
78
0
78
Right
208
1
209
Peds
0
1
1
Out TotalIn
153 291 444
0 2 2
153 446 293
Out
0 0 0
In
0 0 0
Total
0 0
0 Left
16
0
16
Thru
535
7
542
Right
11
0
11
Peds
8
0
8
TotalOut In
277 570 847
9 7 16
286 863 577
Out0 0 0
In 0 0 0
Total0 0
0
Peak Hour Begins at 05:00 PM
Cars +
Trucks
Peak Hour Data
North
APPENDIX B
TURN LANE ANALYSIS
/0/1/2/3/4/i255/6/7/8/9/i255/10 /11/12/13/14/15/13/16/12/10/17/11/15/i255/18 /19/20/21/18/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/23/24/25/26/27/28/29/26/30
/31/24/25/32/i255
/i255
/33/34/i255/35/36/37/i255/38/39/40/30/41/42/i255/31/38/i255/29/28/27/43/37/25/i255/27/37/44/27/37/25/37/24/26/25/i255/26/36/37/i255/44/37/27/29/37/24/26/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/i255/30/24/i255/26/36/37/i255/39/45/43/39/24/29/30/24/46/i255/43/31/41/28/40/37/i255/47/48/49/50/34/i255
/35/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/29/28/27/43/37/i255/38/31/27/i255/26/36/37/i255/39/29/26/28/39/41/i255/44/37/27/29/37/24/26/39/46/37/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/34/i255/i255/51/36/37/24/i255/26/36/30/25/i255/30/25/i255
/24/31/26/i255/39/24/i255/37/43/37/24/i255/30/24/29/27/37/40/37/24/26/i255/31/38/i255/52/53/i255/26/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/37/25/26/30/40/39/26/37/i255/54/36/37/27/37/i255/26/36/37/i255/29/28/27/43/37/i255/41/30/37/25/34/i255
/55/34/i255/56/37/39/45/i255/48/49/i255/39/24/45/i255/48/57/i255/30/24/26/31/i255/26/36/37/i255/29/36/39/27/26/i255/39/24/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/30/24/26/37/27/25/37/29/26/30/31/24/i255/31/38/i255/26/36/37/i255/26/54/31/i255/43/31/41/28/40/37/25/34/i255
/58/34/i255/59/31/26/37/i255/26/36/37/i255/41/31/29/39/26/30/31/24/i255/31/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/24/i255/60/55/i255/27/37/41/39/26/30/43/37/i255/26/31/i255/26/36/37/i255/41/30/24/37/i255/30/24/i255/60/33/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/27/30/46/36/26/i255/31/38/i255
/26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61/26/28/27/24/i255/41/39/24/37/i255/30/25/i255/54/39/27/27/39/24/26/37/45/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/41/37/38/26/i255/31/38/i255/26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61
/26/28/27/24/i255/41/39/24/37/i255/30/25/i255/24/31/26/i255/54/39/27/27/39/24/26/37/45/i255/62/39/25/37/45/i255/31/24/i255/26/27/39/38/38/30/29/i255/43/31/41/28/40/37/25/34/i255
/i255
/i255
/i255
/i255
/63/64/65/66/67/68/i255/70/66/71/72/68/65/71/73/68/74/i255/75/64/76/i255/65/68/75/77/78/77/66/76/73/i255/65/79/73/68/74/i255/79/77/i255/66/73/74/71/70/73/79/65/71/80/68/72/i255
/71/73/77/68/76/74/68/81/77/71/64/73/74/i255/64/73/i255/77/82/64 /78/65/79/73/68/i255/83/71/70/83/82/79/84/74/i255/85/86/87/i255/88/89/90/91/i255
/75/92/93/94/95/96/i255/97/98/99/78/70/i255
/0/1/2/3/4/i255/6/7/8/9/i255/10 /11/12/13/14/15/13/16/12/10/17/11/15/i255/18 /19/20/21/18/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/23/24/25/26/27/28/29/26/30
/31/24/25/32/i255
/i255
/33/34/i255/35/36/37/i255/38/39/40/30/41/42/i255/31/38/i255/29/28/27/43/37/25/i255/27/37/44/27/37/25/37/24/26/25/i255/26/36/37/i255/44/37/27/29/37/24/26/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/i255/30/24/i255/26/36/37/i255/39/45/43/39/24/29/30/24/46/i255/43/31/41/28/40/37/i255/47/48/49/50/34/i255
/35/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/29/28/27/43/37/i255/38/31/27/i255/26/36/37/i255/39/29/26/28/39/41/i255/44/37/27/29/37/24/26/39/46/37/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/34/i255/i255/51/36/37/24/i255/26/36/30/25/i255/30/25/i255
/24/31/26/i255/39/24/i255/37/43/37/24/i255/30/24/29/27/37/40/37/24/26/i255/31/38/i255/52/53/i255/26/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/37/25/26/30/40/39/26/37/i255/54/36/37/27/37/i255/26/36/37/i255/29/28/27/43/37/i255/41/30/37/25/34/i255
/55/34/i255/56/37/39/45/i255/48/49/i255/39/24/45/i255/48/57/i255/30/24/26/31/i255/26/36/37/i255/29/36/39/27/26/i255/39/24/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/30/24/26/37/27/25/37/29/26/30/31/24/i255/31/38/i255/26/36/37/i255/26/54/31/i255/43/31/41/28/40/37/25/34/i255
/58/34/i255/59/31/26/37/i255/26/36/37/i255/41/31/29/39/26/30/31/24/i255/31/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/24/i255/60/55/i255/27/37/41/39/26/30/43/37/i255/26/31/i255/26/36/37/i255/41/30/24/37/i255/30/24/i255/60/33/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/27/30/46/36/26/i255/31/38/i255
/26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61/26/28/27/24/i255/41/39/24/37/i255/30/25/i255/54/39/27/27/39/24/26/37/45/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/41/37/38/26/i255/31/38/i255/26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61
/26/28/27/24/i255/41/39/24/37/i255/30/25/i255/24/31/26/i255/54/39/27/27/39/24/26/37/45/i255/62/39/25/37/45/i255/31/24/i255/26/27/39/38/38/30/29/i255/43/31/41/28/40/37/25/34/i255
/i255
/i255
/i255
/i255
/63/64/65/66/67/68/i255/70/66/71/72/68/65/71/73/68/74/i255/75/64/76/i255/65/68/75/77/78/77/66/76/73/i255/65/79/73/68/74/i255/79/77/i255/66/73/74/71/70/73/79/65/71/80/68/72/i255
/71/73/77/68/76/74/68/81/77/71/64/73/74/i255/64/73/i255/77/82/64 /78/65/79/73/68/i255/83/71/70/83/82/79/84/74/i255/85/86/87/i255/88/89/90/91/i255
/75/92/93/94/95/96/i255/97/98/99/78/70/i255
/0/1/2/3/4/i255/6 /7/8/9/10/11/9/12/8/6/13/7/11/i255/14 /15 /16/17/18/i255/4/19/20/21/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/i255
/23/24/25/26/27/i255/28
/24/29/i255/30/31/32/30/33/34/35/36/i255/33/31/25/30/i255/34/i255/37/26/36/31/32/38/i255/36/39/26/26/37/i255/40/26/41/24/33/i255/42/43/i255/44/31/41/26/36/i255/39/26/29/i255/30/24/45/29/i255/33/31/25/30/i255/34/i255/46/47/48/i255/49/i255/50/43/43/i255/34/38/37/i255/33/30/26/29/26/i255
/29/31/32/30/25/i255/25/45/29/38/36/i255/51/i255/52/43/53/i255/34/38/i255/34/37/54/45/36/25/44/26/38/25/i255/36/30/24/45/41/37/i255/40/26/i255/45/36/26/37/55/i255/i255/56/24/i255/29/26/34/37/i255/25/30/26/i255/57/26/29/25/31/58/34/41/i255/34/59/31/36/i255/24/60/i255/25/30/26/i255/58/30/34/29/25/53/i255
/36/45/40/25/29/34/58/25/i255/61/43/i255/60/29/24/44/i255/25/30/26/i255/34/58/25/45/34/41/i255/38/45/44/40/26/29/i255/24/60/i255/29/31/32/30/25/i255/25/45/29/38/36/55/i255
/i255
/i255
/62/63/64/65/66/67/68/i255
/70/71/72/73/74/75/i255 /76/73/77/71/78/74/i255/11/79/73/73/80/i255/i255/81/i255/82/2/i255/83/71/84/73/77/i255/79/73/16/i255/18/85/86/16/i255
/i255 /76/87/88/i255 /i255/i255/81/i255/4/2/19/i255/72/73/18/71/17/84/73/77/i255/79/73/16/i255/18/85/86/16/i255
/i255 /10/71/78/18/89/i255/8/86/16/74/77/i255/i255 /81/i255/20/19/19/i255/72/73/18/71/17/84/73/77/i255/79/73/16/i255/18/85/86/16/i255
/i255
/90/16/85/91/84/73/83/75/i255/i255 /76/73/89/73/16/83/71/74/73/i255/71/92/i255/15/i255/16/71/78/18/89/3/89/86/16/74/i255/84/15/74/73/i255/71/77/i255/74/73/17/73/77/77/15/16/93/1/i255
/11/85/84/86/89/71/85/74/75/i255/8/85/i255/16/73/15/80/i255/89/18/73/i255/72/73/16/89/71/17/15/84/i255/15/94/71/77/95/i255/86/77/73/i255/20/19/19/i255/96/i255/4/19/i255/81/i255/97/19/i255/72/73/18/71/17/84/73/77/i255/79/73/16/i255/18/85/86/16/1/i255/i255/8/18/73/i255/92/71/78/86/16/73/i255
/71/74/80/71/17/15/89/73/77/i255/89/18/15/89/i255/15/i255/16/71/78/18/89/3/89/86/16/74/i255/84/15/74/73/i255/71/77/i255/74/85/89/i255/74/73/17/73/77/77/15/16/93/95/i255/86/74/84/73/77/77/i255/85/89/18/73/16/i255/92/15/17/89/85/16/77/i255/98/73/1/78/1/95/i255/18/71/78/18/i255
/17/16/15/77/18/i255/16/15/89/73/99/i255/71/74/80/71/17/15/89/73/i255/15/i255/84/15/74/73/i255/71/77/i255/74/73/73/80/73/80/1/i255
/i255
/100/101/102/103/62/104/102/105/62/106/i255/107/108/109/i255/109/102/100/110/111/112/111/101/109/105/i255/104/113/105/62/106/i255/113/111/i255/101/105/106/102/100/105/113/104/102/114/62/103/i255/102/105/111/62/109/106/62/115/111/102/108/105/106/i255
/108/105/i255/111/116/108 /112/104/113/105/62/i255/110/102/100/110/116/113/117/106/i255
/107/118/119/120/121/68/i255/122/123/124/112/113/i255
/i255/i255
APPENDIX C
SYNCHRO ANALYSIS REPORTS
Lanes, Volumes, Timings Existing (2025) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 36 125 12 64 200 196 6 552 16 61 515 19
Future Volume (vph) 36 125 12 64 200 196 6 552 16 61 515 19
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 125 0 125 0
Storage Lanes 0 0 0 0 1 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.991 0.942 0.996 0.995
Flt Protected 0.990 0.993 0.950 0.950
Satd. Flow (prot) 0 1828 0 0 1742 0 1770 1855 0 1770 1853 0
Flt Permitted 0.791 0.929 0.347 0.169
Satd. Flow (perm) 0 1460 0 0 1630 0 646 1855 0 315 1853 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 4 44 2 2
Link Speed (mph) 25 25 35 35
Link Distance (ft) 82 413 570 1253
Travel Time (s) 2.2 11.3 11.1 24.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 40 139 13 71 222 218 7 613 18 68 572 21
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 192 0 0 511 0 7 631 0 68 593 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 1 2 1 2
Detector Template Left Thru Left Thru Left Thru Left Thru
Leading Detector (ft) 20 100 20 100 20 100 20 100
Trailing Detector (ft) 0 0 0 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 20 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94 94
Detector 2 Size(ft) 6 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0 0.0
Turn Type Perm NA Perm NA pm+pt NA pm+pt NA
Protected Phases 4 8 5 2 1 6
P e r m i t t e d P h a s e s 4826
Lanes, Volumes, Timings Existing (2025) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 43.0 43.0 43.0 43.0 9.6 47.2 9.8 47.4
Total Split (%) 43.0% 43.0% 43.0% 43.0% 9.6% 47.2% 9.8% 47.4%
Maximum Green (s) 38.5 38.5 38.5 38.5 5.1 42.7 5.3 42.9
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lag Lag Lead Lead
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
Act Effct Green (s) 33.9 33.9 48.7 48.7 55.2 55.2
Actuated g/C Ratio 0.34 0.34 0.49 0.49 0.55 0.55
v/c Ratio 0.39 0.88 0.02 0.70 0.26 0.58
Control Delay (s/veh) 26.0 45.5 14.0 18.4 15.7 19.7
Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0
Total Delay (s/veh) 26.0 45.5 14.0 18.5 15.7 19.7
LOS C D B B B B
Approach Delay (s/veh) 26.0 45.5 18.5 19.3
Approach LOS C D B B
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 77 (77%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay (s/veh): 26.4 Intersection LOS: C
Intersection Capacity Utilization 76.8% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 1: NE Main Street (SC 417) & College Street
Lanes, Volumes, Timings Existing (2025) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 25 189 13 51 235 122 22 410 43 118 442 21
Future Volume (vph) 25 189 13 51 235 122 22 410 43 118 442 21
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 150 0
Storage Lanes 0 0 0 0 1 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.992 0.960 0.986 0.993
Flt Protected 0.994 0.994 0.950 0.950
Satd. Flow (prot) 0 1837 0 0 1778 0 1770 1837 0 1770 1850 0
Flt Permitted 0.898 0.918 0.391 0.289
Satd. Flow (perm) 0 1659 0 0 1642 0 728 1837 0 538 1850 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 3 25 6 3
Link Speed (mph) 25 25 35 35
Link Distance (ft) 85 379 1084 570
Travel Time (s) 2.3 10.3 21.1 11.1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 28 210 14 57 261 136 24 456 48 131 491 23
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 252 0 0 454 0 24 504 0 131 514 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 1 2 1 2
Detector Template Left Thru Left Thru Left Thru Left Thru
Leading Detector (ft) 20 100 20 100 20 100 20 100
Trailing Detector (ft) 0 0 0 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 20 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94 94
Detector 2 Size(ft) 6 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0 0.0
Turn Type Perm NA Perm NA pm+pt NA pm+pt NA
Protected Phases 4 8 5 2 1 6
P e r m i t t e d P h a s e s 4826
Lanes, Volumes, Timings Existing (2025) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 42.0 42.0 42.0 42.0 9.6 45.0 13.0 48.4
Total Split (%) 42.0% 42.0% 42.0% 42.0% 9.6% 45.0% 13.0% 48.4%
Maximum Green (s) 37.5 37.5 37.5 37.5 5.1 40.5 8.5 43.9
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
Act Effct Green (s) 31.0 31.0 53.0 47.3 59.6 55.9
Actuated g/C Ratio 0.31 0.31 0.53 0.47 0.60 0.56
v/c Ratio 0.49 0.86 0.05 0.58 0.31 0.50
Control Delay (s/veh) 30.0 29.0 10.7 24.0 5.5 7.0
Queue Delay 0.0 0.6 0.0 0.1 0.0 0.1
Total Delay (s/veh) 30.0 29.5 10.7 24.1 5.5 7.1
L O S C CB CA A
Approach Delay (s/veh) 30.0 29.5 23.5 6.8
Approach LOS C C C A
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 80 (80%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.86
Intersection Signal Delay (s/veh): 20.1 Intersection LOS: C
Intersection Capacity Utilization 73.2% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street
Lanes, Volumes, Timings Existing (2025) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 5
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 153 47 117 442 12 54
Future Volume (vph) 153 47 117 442 12 54
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.968 0.889
Flt Protected 0.990 0.991
Satd. Flow (prot) 1803 0 0 1844 1641 0
Flt Permitted 0.990 0.991
Satd. Flow (perm) 1803 0 0 1844 1641 0
Link Speed (mph) 25 25 25
Link Distance (ft) 413 1158 568
Travel Time (s) 11.3 31.6 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 170 52 130 491 13 60
Shared Lane Traffic (%)
Lane Group Flow (vph) 222 0 0 621 73 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 54.6% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Existing (2025) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 6
Intersection
Int Delay, s/veh 2.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 153 47 117 442 12 54
Future Vol, veh/h 153 47 117 442 12 54
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 170 52 130 491 13 60
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 222 0 947 196
Stage 1 - - - - 196 -
Stage 2 - - - - 751 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1347 - 290 845
Stage 1 - - - - 837 -
Stage 2 - - - - 466 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1347 - 251 845
Mov Cap-2 Maneuver - - - - 251 -
Stage 1 - - - - 837 -
Stage 2 - - - - 404 -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 1.7 12
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 591 - - 1347 -
HCM Lane V/C Ratio 0.124 - - 0.097 -
HCM Ctrl Dly (s/v) 12 - - 8 0
HCM Lane LOS B - - A A
HCM 95th %tile Q (veh) 0.4 - - 0.3 -
Lanes, Volumes, Timings Existing (2025) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 319 4 72 397 12 7 73 129 35 145 4
Future Volume (vph) 4 319 4 72 397 12 7 73 129 35 145 4
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.997 0.917 0.997
Flt Protected 0.999 0.993 0.998 0.991
Satd. Flow (prot) 0 1859 0 0 1844 0 0 1705 0 0 1840 0
Flt Permitted 0.996 0.890 0.998 0.991
Satd. Flow (perm) 0 1853 0 0 1653 0 0 1705 0 0 1840 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 72 1
Link Speed (mph) 25 25 25 25
Link Distance (ft) 379 1213 1024 568
Travel Time (s) 10.3 33.1 27.9 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 4 354 4 80 441 13 8 81 143 39 161 4
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 362 0 0 534 0 0 232 0 0 204 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 0 1 1 1 1
Detector Template Left Thru Left Left Left
Leading Detector (ft) 20 100 20 0 20 30 20 30
Trailing Detector (ft) 0 0 0 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 20 30 20 30
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94
Detector 2 Size(ft) 6
Detector 2 Type Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0
Turn Type Perm NA Perm NA Split NA Split NA
Protected Phases 2 6 4 4 8 8
Permitted Phases 2 6
Detector Phase 2 2 6 6 4 4 8 8
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Lanes, Volumes, Timings Existing (2025) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5
Total Split (s) 52.2 52.2 52.2 52.2 24.2 24.2 23.6 23.6
Total Split (%) 52.2% 52.2% 52.2% 52.2% 24.2% 24.2% 23.6% 23.6%
Maximum Green (s) 47.7 47.7 47.7 47.7 19.7 19.7 19.1 19.1
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode C-Max C-Max Max Max None None None None
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0
Act Effct Green (s) 56.3 56.3 14.6 15.6
Actuated g/C Ratio 0.56 0.56 0.15 0.16
v/c Ratio 0.35 0.57 0.75 0.71
Control Delay (s/veh) 8.3 19.0 42.7 50.8
Queue Delay 0.5 0.1 0.0 0.0
Total Delay (s/veh) 8.8 19.1 42.7 50.8
LOS A B D D
Approach Delay (s/veh) 8.8 19.1 42.7 50.8
Approach LOS A B D D
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 6 (6%), Referenced to phase 2:EBTL, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.75
Intersection Signal Delay (s/veh): 25.3 Intersection LOS: C
Intersection Capacity Utilization 78.4% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 4: Hedge Street & Curtis Street
Lanes, Volumes, Timings Existing (2025) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 5 165 1 4 212 9 0 0 7 1 0 21
F u t u r e V o l u m e ( v p h ) 5 1 6 514 2 1 2900710 2 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.995 0.865 0.871
Flt Protected 0.998 0.999 0.998
Satd. Flow (prot) 0 1857 0 0 1852 0 0 1611 0 0 1619 0
Flt Permitted 0.998 0.999 0.998
Satd. Flow (perm) 0 1857 0 0 1852 0 0 1611 0 0 1619 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1082 82 565 1260
Travel Time (s) 29.5 2.2 15.4 34.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 6 183 1 4 236 10 0 0 8 1 0 23
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 190 0 0 250 0 0 8 0 0 24 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 23.4% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Existing (2025) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 10
Intersection
Int Delay, s/veh 0.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 5 1 6 514 2 1 2900710 2 1
F u t u r e V o l , v e h / h 5 1 6 514 2 1 2900710 2 1
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 6 1 8 314 2 3 6 1 000810 2 3
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 246 0 0 184 0 0 457 450 184 449 445 241
Stage 1 - ----- 1 9 6 1 9 6- 2 4 9 2 4 9-
Stage 2 - ----- 2 6 1 2 5 4- 2 0 0 1 9 6-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1320 - - 1391 - - 514 504 858 520 508 798
Stage 1 - ----- 8 0 6 7 3 9- 7 5 5 7 0 1-
Stage 2 - ----- 7 4 4 6 9 7- 8 0 2 7 3 9-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1320 - - 1391 - - 496 500 858 512 504 798
Mov Cap-2 Maneuver - ----- 4 9 6 5 0 0- 5 1 2 5 0 4-
Stage 1 - ----- 8 0 2 7 3 5- 7 5 1 6 9 9-
Stage 2 - ----- 7 2 0 6 9 5- 7 9 1 7 3 5-
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0.2 0.1 9.2 9.8
HCM LOS A A
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 858 1320 - - 1391 - - 778
HCM Lane V/C Ratio 0.009 0.004 - - 0.003 - - 0.031
HCM Ctrl Dly (s/v) 9.2 7.7 0 - 7.6 0 - 9.8
HCM Lane LOS A A A - A A - A
HCM 95th %tile Q (veh) 0 0 - - 0 - - 0.1
Lanes, Volumes, Timings Existing (2025) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 214 11 13 257 8 14 0 12 1 0 16
Future Volume (vph) 1 214 11 13 257 8 14 0 12 1 0 16
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.994 0.996 0.939 0.872
Flt Protected 0.998 0.973 0.997
Satd. Flow (prot) 0 1852 0 0 1852 0 0 1702 0 0 1619 0
Flt Permitted 0.998 0.973 0.997
Satd. Flow (perm) 0 1852 0 0 1852 0 0 1702 0 0 1619 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1197 85 1027 565
Travel Time (s) 32.6 2.3 28.0 15.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 1 238 12 14 286 9 16 0 13 1 0 18
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 251 0 0 309 0 0 29 0 0 19 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 37.0% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Existing (2025) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 12
Intersection
Int Delay, s/veh 1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 1 214 11 13 257 8 14 0 12 1 0 16
Future Vol, veh/h 1 214 11 13 257 8 14 0 12 1 0 16
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 1 238 12 14 286 9 16 0 13 1 0 18
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 295 0 0 250 0 0 574 569 244 572 571 291
Stage 1 - ----- 2 4 6 2 4 6- 3 1 9 3 1 9-
Stage 2 - ----- 3 2 8 3 2 3- 2 5 3 2 5 2-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1266 - - 1316 - - 430 432 795 431 431 748
Stage 1 - ----- 7 5 8 7 0 3- 6 9 3 6 5 3-
Stage 2 - ----- 6 8 5 6 5 0- 7 5 1 6 9 8-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1266 - - 1316 - - 415 426 795 419 425 748
Mov Cap-2 Maneuver - ----- 4 1 5 4 2 6- 4 1 9 4 2 5-
Stage 1 - ----- 7 5 7 7 0 2- 6 9 2 6 4 5-
Stage 2 - ----- 6 6 0 6 4 2- 7 3 8 6 9 7-
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0 0.4 12.2 10.2
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 532 1266 - - 1316 - - 715
HCM Lane V/C Ratio 0.054 0.001 - - 0.011 - - 0.026
HCM Ctrl Dly (s/v) 12.2 7.8 0 - 7.8 0 - 10.2
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q (veh) 0.2 0 - - 0 - - 0.1
Lanes, Volumes, Timings Existing (2025) PM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 33 177 27 42 160 103 12 498 72 123 663 22
Future Volume (vph) 33 177 27 42 160 103 12 498 72 123 663 22
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 125 0 125 0
Storage Lanes 0 0 0 0 1 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.985 0.955 0.981 0.995
Flt Protected 0.993 0.993 0.950 0.950
Satd. Flow (prot) 0 1822 0 0 1766 0 1770 1827 0 1770 1853 0
Flt Permitted 0.832 0.867 0.262 0.249
Satd. Flow (perm) 0 1527 0 0 1542 0 488 1827 0 464 1853 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 6 26 10 2
Link Speed (mph) 25 25 35 35
Link Distance (ft) 82 413 570 1253
Travel Time (s) 2.2 11.3 11.1 24.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 37 197 30 47 178 114 13 553 80 137 737 24
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 264 0 0 339 0 13 633 0 137 761 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 1 2 1 2
Detector Template Left Thru Left Thru Left Thru Left Thru
Leading Detector (ft) 20 100 20 100 20 100 20 100
Trailing Detector (ft) 0 0 0 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 20 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94 94
Detector 2 Size(ft) 6 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0 0.0
Turn Type Perm NA Perm NA pm+pt NA pm+pt NA
Protected Phases 4 8 5 2 1 6
P e r m i t t e d P h a s e s 4826
Lanes, Volumes, Timings Existing (2025) PM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 33.0 33.0 33.0 33.0 9.6 53.8 13.2 57.4
Total Split (%) 33.0% 33.0% 33.0% 33.0% 9.6% 53.8% 13.2% 57.4%
Maximum Green (s) 28.5 28.5 28.5 28.5 5.1 49.3 8.7 52.9
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
Act Effct Green (s) 23.8 23.8 60.2 54.8 67.0 65.3
Actuated g/C Ratio 0.24 0.24 0.60 0.55 0.67 0.65
v/c Ratio 0.72 0.88 0.04 0.63 0.33 0.63
Control Delay (s/veh) 45.0 56.8 4.3 9.7 8.9 15.1
Queue Delay 0.0 0.0 0.0 0.2 0.0 0.0
Total Delay (s/veh) 45.0 56.8 4.3 9.9 8.9 15.1
L O S D EA AA B
Approach Delay (s/veh) 45.0 56.8 9.8 14.2
Approach LOS D E A B
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 72 (72%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay (s/veh): 23.4 Intersection LOS: C
Intersection Capacity Utilization 74.3% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 1: NE Main Street (SC 417) & College Street
Lanes, Volumes, Timings Existing (2025) PM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 16 252 21 30 190 54 44 456 136 191 465 51
Future Volume (vph) 16 252 21 30 190 54 44 456 136 191 465 51
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 150 0
Storage Lanes 0 0 0 0 1 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.990 0.973 0.966 0.985
Flt Protected 0.997 0.995 0.950 0.950
Satd. Flow (prot) 0 1839 0 0 1803 0 1770 1799 0 1770 1835 0
Flt Permitted 0.955 0.841 0.375 0.232
Satd. Flow (perm) 0 1761 0 0 1524 0 699 1799 0 432 1835 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 4 12 21 9
Link Speed (mph) 25 25 35 35
Link Distance (ft) 85 379 1084 570
Travel Time (s) 2.3 10.3 21.1 11.1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 18 280 23 33 211 60 49 507 151 212 517 57
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 321 0 0 304 0 49 658 0 212 574 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 1 2 1 2
Detector Template Left Thru Left Thru Left Thru Left Thru
Leading Detector (ft) 20 100 20 100 20 100 20 100
Trailing Detector (ft) 0 0 0 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 20 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94 94
Detector 2 Size(ft) 6 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0 0.0
Turn Type Perm NA Perm NA pm+pt NA pm+pt NA
Protected Phases 4 8 5 2 1 6
P e r m i t t e d P h a s e s 4826
Lanes, Volumes, Timings Existing (2025) PM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 8 8 5 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 30.0 30.0 30.0 30.0 9.6 53.0 17.0 60.4
Total Split (%) 30.0% 30.0% 30.0% 30.0% 9.6% 53.0% 17.0% 60.4%
Maximum Green (s) 25.5 25.5 25.5 25.5 5.1 48.5 12.5 55.9
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0
Act Effct Green (s) 22.0 22.0 60.3 54.7 68.4 60.9
Actuated g/C Ratio 0.22 0.22 0.60 0.55 0.68 0.61
v/c Ratio 0.82 0.88 0.10 0.66 0.50 0.51
Control Delay (s/veh) 54.0 46.7 6.9 21.1 12.0 9.8
Queue Delay 0.0 0.1 0.0 0.3 0.1 0.2
Total Delay (s/veh) 54.0 46.8 6.9 21.4 12.1 10.0
L O S D DA CB B
Approach Delay (s/veh) 54.0 46.8 20.4 10.6
Approach LOS D D C B
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 66 (66%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green
Natural Cycle: 65
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay (s/veh): 25.6 Intersection LOS: C
Intersection Capacity Utilization 77.8% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street
Lanes, Volumes, Timings Existing (2025) PM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 5
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 331 133 44 268 9 56
Future Volume (vph) 331 133 44 268 9 56
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.961 0.884
Flt Protected 0.993 0.993
Satd. Flow (prot) 1790 0 0 1850 1635 0
Flt Permitted 0.993 0.993
Satd. Flow (perm) 1790 0 0 1850 1635 0
Link Speed (mph) 25 25 25
Link Distance (ft) 413 1158 568
Travel Time (s) 11.3 31.6 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 368 148 49 298 10 62
Shared Lane Traffic (%)
Lane Group Flow (vph) 516 0 0 347 72 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 56.0% ICU Level of Service B
Analysis Period (min) 15
HCM 6th TWSC Existing (2025) PM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 6
Intersection
Int Delay, s/veh 1.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 331 133 44 268 9 56
Future Vol, veh/h 331 133 44 268 9 56
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 368 148 49 298 10 62
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 516 0 838 442
Stage 1 - - - - 442 -
Stage 2 - - - - 396 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1050 - 336 615
Stage 1 - - - - 648 -
Stage 2 - - - - 680 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1050 - 317 615
Mov Cap-2 Maneuver - - - - 317 -
Stage 1 - - - - 648 -
Stage 2 - - - - 642 -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 1.2 12.6
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 544 - - 1050 -
HCM Lane V/C Ratio 0.133 - - 0.047 -
HCM Ctrl Dly (s/v) 12.6 - - 8.6 0
HCM Lane LOS B - - A A
HCM 95th %tile Q (veh) 0.5 - - 0.1 -
Lanes, Volumes, Timings Existing (2025) PM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 16 542 11 75 275 11 5 78 209 107 67 6
Future Volume (vph) 16 542 11 75 275 11 5 78 209 107 67 6
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.997 0.996 0.904 0.995
Flt Protected 0.999 0.990 0.999 0.971
Satd. Flow (prot) 0 1855 0 0 1837 0 0 1682 0 0 1800 0
Flt Permitted 0.985 0.778 0.999 0.971
Satd. Flow (perm) 0 1829 0 0 1443 0 0 1682 0 0 1800 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 1 2 114 2
Link Speed (mph) 25 25 25 25
Link Distance (ft) 379 1213 1024 568
Travel Time (s) 10.3 33.1 27.9 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 18 602 12 83 306 12 6 87 232 119 74 7
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 632 0 0 401 0 0 325 0 0 200 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 0 1 1 1 1
Detector Template Left Thru Left Left Left
Leading Detector (ft) 20 100 20 0 20 30 20 30
Trailing Detector (ft) 0 0 0 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 20 30 20 30
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94
Detector 2 Size(ft) 6
Detector 2 Type Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0
Turn Type Perm NA Perm NA Split NA Split NA
Protected Phases 2 6 4 4 8 8
Permitted Phases 2 6
Detector Phase 2 2 6 6 4 4 8 8
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Lanes, Volumes, Timings Existing (2025) PM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5
Total Split (s) 51.0 51.0 51.0 51.0 26.0 26.0 23.0 23.0
Total Split (%) 51.0% 51.0% 51.0% 51.0% 26.0% 26.0% 23.0% 23.0%
Maximum Green (s) 46.5 46.5 46.5 46.5 21.5 21.5 18.5 18.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0
Recall Mode C-Max C-Max Max Max None None None None
Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0
Act Effct Green (s) 53.6 53.6 17.4 15.4
Actuated g/C Ratio 0.54 0.54 0.17 0.15
v/c Ratio 0.64 0.52 0.84 0.72
Control Delay (s/veh) 16.0 19.8 44.6 51.3
Queue Delay 1.2 0.0 0.0 0.0
Total Delay (s/veh) 17.2 19.8 44.6 51.3
LOS B B D D
Approach Delay (s/veh) 17.2 19.8 44.6 51.3
Approach LOS B B D D
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 8 (8%), Referenced to phase 2:EBTL, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.84
Intersection Signal Delay (s/veh): 27.9 Intersection LOS: C
Intersection Capacity Utilization 91.4% ICU Level of Service F
Analysis Period (min) 15
Splits and Phases: 4: Hedge Street & Curtis Street
Lanes, Volumes, Timings Existing (2025) PM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 3 217 2 15 175 4 4 0 6 14 0 28
Future Volume (vph) 3 217 2 15 175 4 4 0 6 14 0 28
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.997 0.914 0.911
Flt Protected 0.999 0.996 0.982 0.983
Satd. Flow (prot) 0 1859 0 0 1850 0 0 1672 0 0 1668 0
Flt Permitted 0.999 0.996 0.982 0.983
Satd. Flow (perm) 0 1859 0 0 1850 0 0 1672 0 0 1668 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1082 82 565 1260
Travel Time (s) 29.5 2.2 15.4 34.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 3 241 2 17 194 4 4 0 7 16 0 31
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 246 0 0 215 0 0 11 0 0 47 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.5% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Existing (2025) PM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 10
Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 3 2 1 72 1 5 1 7 54406 1 40 2 8
F u t u r e V o l , v e h / h 3 2 1 72 1 5 1 7 54406 1 40 2 8
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 3 2 4 12 1 7 1 9 44407 1 60 3 1
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 198 0 0 243 0 0 494 480 242 482 479 196
Stage 1 - ----- 2 4 8 2 4 8- 2 3 0 2 3 0-
Stage 2 - ----- 2 4 6 2 3 2- 2 5 2 2 4 9-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1375 - - 1323 - - 486 485 797 495 486 845
Stage 1 - ----- 7 5 6 7 0 1- 7 7 3 7 1 4-
Stage 2 - ----- 7 5 8 7 1 3- 7 5 2 7 0 1-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1375 - - 1323 - - 462 477 797 485 478 845
Mov Cap-2 Maneuver - ----- 4 6 2 4 7 7- 4 8 5 4 7 8-
Stage 1 - ----- 7 5 4 6 9 9- 7 7 1 7 0 4-
Stage 2 - ----- 7 2 0 7 0 3- 7 4 3 6 9 9-
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0.1 0.6 10.9 10.7
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 618 1375 - - 1323 - - 677
HCM Lane V/C Ratio 0.018 0.002 - - 0.013 - - 0.069
HCM Ctrl Dly (s/v) 10.9 7.6 0 - 7.8 0 - 10.7
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q (veh) 0.1 0 - - 0 - - 0.2
Lanes, Volumes, Timings Existing (2025) PM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 255 2 31 244 10 9 0 23 11 0 29
Future Volume (vph) 4 255 2 31 244 10 9 0 23 11 0 29
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.995 0.902 0.902
Flt Protected 0.999 0.995 0.986 0.987
Satd. Flow (prot) 0 1859 0 0 1844 0 0 1657 0 0 1658 0
Flt Permitted 0.999 0.995 0.986 0.987
Satd. Flow (perm) 0 1859 0 0 1844 0 0 1657 0 0 1658 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1197 85 1027 565
Travel Time (s) 32.6 2.3 28.0 15.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 4 283 2 34 271 11 10 0 26 12 0 32
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 289 0 0 316 0 0 36 0 0 44 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 41.9% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Existing (2025) PM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 12
Intersection
Int Delay, s/veh 1.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 4 255 2 31 244 10 9 0 23 11 0 29
Future Vol, veh/h 4 255 2 31 244 10 9 0 23 11 0 29
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
Mvmt Flow 4 283 2 34 271 11 10 0 26 12 0 32
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 282 0 0 285 0 0 653 642 284 650 638 277
Stage 1 - ----- 2 9 2 2 9 2- 3 4 5 3 4 5-
Stage 2 - ----- 3 6 1 3 5 0- 3 0 5 2 9 3-
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2-
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 1280 - - 1277 - - 380 392 755 382 394 762
Stage 1 - ----- 7 1 6 6 7 1- 6 7 1 6 3 6-
Stage 2 - ----- 6 5 7 6 3 3- 7 0 5 6 7 0-
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 1280 - - 1277 - - 354 378 755 359 380 762
Mov Cap-2 Maneuver - ----- 3 5 4 3 7 8- 3 5 9 3 8 0-
Stage 1 - ----- 7 1 3 6 6 8- 6 6 8 6 1 6-
Stage 2 - ----- 6 0 9 6 1 3- 6 7 8 6 6 7-
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0.1 0.9 11.7 11.7
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 573 1280 - - 1277 - - 582
HCM Lane V/C Ratio 0.062 0.003 - - 0.027 - - 0.076
HCM Ctrl Dly (s/v) 11.7 7.8 0 - 7.9 0 - 11.7
HCM Lane LOS B A A - A A - B
HCM 95th %tile Q (veh) 0.2 0 - - 0.1 - - 0.2
Lanes, Volumes, Timings No-Build (2028) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 122 462 337 30 495 0 0 611 42
Future Volume (vph) 0 0 0 122 462 337 30 495 0 0 611 42
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 125 0
Storage Lanes 0 0 0 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.945 0.991
Flt Protected 0.993 0.950
S a t d . F l o w ( p r o t ) 0000 3321 0 1770 1863 0 0 1846 0
Flt Permitted 0.993 0.188
S a t d . F l o w ( p e r m ) 0000 3321 0 350 1863 0 0 1846 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 123 5
Link Speed (mph) 25 25 35 35
Link Distance (ft) 82 413 570 1253
Travel Time (s) 2.2 11.3 11.1 24.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 136 513 374 33 550 0 0 679 47
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 1023 0 33 550 0 0 726 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 2
Detector Template Left Thru Left Thru Thru
Leading Detector (ft) 20 100 20 100 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA pm+pt NA NA
Protected Phases 8 5 2 6
Permitted Phases 8 2
Lanes, Volumes, Timings No-Build (2028) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 8 8 5 2 6
Switch Phase
Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0
Minimum Split (s) 22.5 22.5 9.5 22.5 22.5
Total Split (s) 38.0 38.0 9.6 62.0 52.4
Total Split (%) 38.0% 38.0% 9.6% 62.0% 52.4%
Maximum Green (s) 33.5 33.5 5.1 57.5 47.9
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None C-Max C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 32.5 58.5 58.5 52.8
Actuated g/C Ratio 0.33 0.59 0.59 0.53
v/c Ratio 0.88 0.12 0.50 0.74
Control Delay (s/veh) 38.0 3.0 4.0 25.8
Queue Delay 0.0 0.0 0.1 0.0
Total Delay (s/veh) 38.0 3.0 4.1 25.8
LOS D A A C
Approach Delay (s/veh) 38.0 4.0 25.8
Approach LOS D A C
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 14 (14%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay (s/veh): 25.7 Intersection LOS: C
Intersection Capacity Utilization 77.2% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 1: NE Main Street (SC 417) & College Street
Lanes, Volumes, Timings No-Build (2028) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 6 5 3 3 3 2 70000 4 4 1 6 3 1 9 0 5 3 30
F u t u r e V o l u m e ( v p h ) 6 5 3 3 3 2 70000 4 4 1 6 3 1 9 0 5 3 30
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 225 0
Storage Lanes 0 0 0 0 0 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.990 0.983
Flt Protected 0.992 0.950
S a t d . F l o w ( p r o t ) 0 3 4 7 600000 1831 0 1770 1863 0
Flt Permitted 0.992 0.329
S a t d . F l o w ( p e r m ) 0 3 4 7 600000 1831 0 613 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 6 10
Link Speed (mph) 25 25 35 35
Link Distance (ft) 85 379 1084 570
Travel Time (s) 2.3 10.3 21.1 11.1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 7 2 3 7 0 3 00000 4 9 0 7 0 2 1 1 5 9 20
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 47 200000 5 6 00 2 1 1 5 9 20
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 2 1 2
Detector Template Left Thru Thru Left Thru
Leading Detector (ft) 20 100 100 20 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA NA pm+pt NA
Protected Phases 4 2 1 6
Permitted Phases 4 6
Lanes, Volumes, Timings No-Build (2028) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 9.5 22.5
Total Split (s) 27.0 27.0 55.0 18.0 73.0
Total Split (%) 27.0% 27.0% 55.0% 18.0% 73.0%
Maximum Green (s) 22.5 22.5 50.5 13.5 68.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 18.8 54.2 72.2 72.2
Actuated g/C Ratio 0.19 0.54 0.72 0.72
v/c Ratio 0.72 0.56 0.35 0.44
Control Delay (s/veh) 43.9 18.2 2.6 2.2
Queue Delay 0.0 0.0 0.0 0.3
Total Delay (s/veh) 43.9 18.2 2.6 2.5
LOS D B A A
Approach Delay (s/veh) 43.9 18.2 2.5
Approach LOS D B A
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 9 (9%), Referenced to phase 2:NBT and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay (s/veh): 18.0 Intersection LOS: B
Intersection Capacity Utilization 77.2% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street
Lanes, Volumes, Timings No-Build (2028) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 5
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 0 0 213 890 24 0
Future Volume (vph) 0 0 213 890 24 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00
Frt
Flt Protected 0.990 0.950
Satd. Flow (prot) 0 0 0 3504 1770 0
Flt Permitted 0.990 0.950
Satd. Flow (perm) 0 0 0 3504 1770 0
Link Speed (mph) 25 25 25
Link Distance (ft) 413 1158 568
Travel Time (s) 11.3 31.6 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 237 989 27 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 1226 27 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 40.8% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC No-Build (2028) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 6
Intersection
Int Delay, s/veh 0.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 213 890 24 0
Future Vol, veh/h 0 0 213 890 24 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 237 989 27 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 969 -
Stage 1 - - 0 -
Stage 2 - - 969 -
Critical Hdwy 4.14 - 6.84 -
C r i t i c a l H d w y S t g 1 ----
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 251 0
Stage 1 - - - 0
Stage 2 - - 329 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 251 -
Mov Cap-2 Maneuver - - 251 -
Stage 1 ----
Stage 2 - - 329 -
Approach WB NB
HCM Ctrl Dly, s/v 21
HCM LOS C
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 251 - -
HCM Lane V/C Ratio 0.106 - -
HCM Ctrl Dly (s/v) 21 - -
HCM Lane LOS C - -
HCM 95th %tile Q (veh) 0.4 - -
Lanes, Volumes, Timings No-Build (2028) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 4 5 0 1 5 40000 2 8 1 9 4 3 7 1 8 00
F u t u r e V o l u m e ( v p h ) 4 5 0 1 5 40000 2 8 1 9 4 3 7 1 8 00
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.986 0.882
Flt Protected 0.992
S a t d . F l o w ( p r o t ) 0 3 4 9 000000 1643 0 0 1848 0
Flt Permitted 0.992
S a t d . F l o w ( p e r m ) 0 3 4 9 000000 1643 0 0 1848 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 12 216
Link Speed (mph) 25 25 25 25
Link Distance (ft) 379 1213 1024 568
Travel Time (s) 10.3 33.1 27.9 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 4 5 5 7 6 00000 3 1 2 1 6 4 1 2 0 00
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 62 100000 2 4 700 2 4 10
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 1 1
Detector Template Left Thru Left
Leading Detector (ft) 20 100 30 20 30
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 30 20 30
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94
Detector 2 Size(ft) 6
Detector 2 Type Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0
Turn Type Perm NA NA Split NA
Protected Phases 2 4 8 8
Permitted Phases 2
Detector Phase 2 2 4 8 8
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0
Lanes, Volumes, Timings No-Build (2028) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Split (s) 22.5 22.5 22.5 22.5 22.5
Total Split (s) 38.0 38.0 29.0 33.0 33.0
Total Split (%) 38.0% 38.0% 29.0% 33.0% 33.0%
Maximum Green (s) 33.5 33.5 24.5 28.5 28.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode C-Max C-Max None None None
Walk Time (s) 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0
Act Effct Green (s) 58.5 9.7 18.3
Actuated g/C Ratio 0.59 0.10 0.18
v/c Ratio 0.30 0.70 0.71
Control Delay (s/veh) 6.7 19.6 49.8
Queue Delay 0.2 0.0 0.0
Total Delay (s/veh) 6.9 19.6 49.8
LOS A B D
Approach Delay (s/veh) 6.9 19.6 49.8
Approach LOS A B D
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 76 (76%), Referenced to phase 2:EBTL, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.71
Intersection Signal Delay (s/veh): 19.0 Intersection LOS: B
Intersection Capacity Utilization 51.9% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 4: Hedge Street & Curtis Street
Lanes, Volumes, Timings No-Build (2028) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 27 498 10 32 5 0 0 1 22
Future Volume (vph) 0 0 0 27 498 10 32 5 0 0 1 22
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.997 0.870
Flt Protected 0.997 0.959
S a t d . F l o w ( p r o t ) 0000 3518 0 0 1786 0 0 1621 0
Flt Permitted 0.997 0.959
S a t d . F l o w ( p e r m ) 0000 3518 0 0 1786 0 0 1621 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1082 82 565 1260
Travel Time (s) 29.5 2.2 15.4 34.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 30 553 11 36 6 0 0 1 24
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 5 9 400 4 200 2 50
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.2% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC No-Build (2028) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 10
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 000 2 7 4 9 8 1 0 3 25001 2 2
F u t u r e V o l , v e h / h 000 2 7 4 9 8 1 0 3 25001 2 2
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 000 3 0 5 5 3 1 1 3 66001 2 4
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 337 624 - - 619 282
Stage 1 - - - 0 0 - - 619 -
Stage 2 - - - 337 624 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
C r i t i c a l H d w y S t g 1 ------- 5 . 5 4-
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 593 400 0 0 403 715
Stage 1 ----- 0 0 4 7 8-
Stage 2 - - - 651 476 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 572 400 - - 403 715
Mov Cap-2 Maneuver - - - 572 400 - - 403 -
Stage 1 ------- 4 7 8-
Stage 2 - - - 627 476 - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 12.2 10.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1
Capacity (veh/h) 541 - - - 692
HCM Lane V/C Ratio 0.076 - - - 0.037
HCM Ctrl Dly (s/v) 12.2 - - - 10.4
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.2 - - - 0.1
Lanes, Volumes, Timings No-Build (2028) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 6 4 0 2 1 300007 2 02 1 30
F u t u r e V o l u m e ( v p h ) 6 4 0 2 1 300007 2 02 1 30
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.996 0.901
Flt Protected 0.999 0.994
S a t d . F l o w ( p r o t ) 0 3 5 2 200000 1678 0 0 1852 0
Flt Permitted 0.999 0.994
S a t d . F l o w ( p e r m ) 0 3 5 2 200000 1678 0 0 1852 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1197 85 1027 565
Travel Time (s) 32.6 2.3 28.0 15.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 7 4 4 7 1 400008 2 22 1 40
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 46 800000 3 000 1 60
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 21.7% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC No-Build (2028) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 12
Intersection
Int Delay, s/veh 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 6 4 0 2 1 300007 2 02 1 30
F u t u r e V o l , v e h / h 6 4 0 2 1 300007 2 02 1 30
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 7 4 4 7 1 400008 2 22 1 40
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 0 0 0 - 468 231 242 475 -
Stage 1 - - - - 468 - 0 0 -
Stage 2 - - - - 0 - 242 475 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
C r i t i c a l H d w y S t g 1 --- - 5 . 5 4----
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver - - - 0 491 771 692 487 0
Stage 1 - - - 0 560 - - - 0
Stage 2 - - - 0 - - 740 556 0
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - - 491 771 664 487 -
Mov Cap-2 Maneuver - - - - 491 - 664 487 -
Stage 1 - - - - 560 - - - -
Stage 2 - - - - - - 709 556 -
Approach EB NB SB
HCM Ctrl Dly, s/v 10.6 12.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1
Capacity (veh/h) 672 - - - 505
HCM Lane V/C Ratio 0.045 - - - 0.033
HCM Ctrl Dly (s/v) 10.6 - - - 12.4
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.1 - - - 0.1
Lanes, Volumes, Timings No-Build (2028) PM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 76 371 167 59 506 0 0 834 77
Future Volume (vph) 0 0 0 76 371 167 59 506 0 0 834 77
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 125 0
Storage Lanes 0 0 0 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.959 0.989
Flt Protected 0.994 0.950
S a t d . F l o w ( p r o t ) 0000 3374 0 1770 1863 0 0 1842 0
Flt Permitted 0.994 0.083
S a t d . F l o w ( p e r m ) 0000 3374 0 155 1863 0 0 1842 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 50 8
Link Speed (mph) 25 25 35 35
Link Distance (ft) 82 413 570 1253
Travel Time (s) 2.2 11.3 11.1 24.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 84 412 186 66 562 0 0 927 86
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 6 8 20 6 6 5 6 200 1013 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 2
Detector Template Left Thru Left Thru Thru
Leading Detector (ft) 20 100 20 100 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA pm+pt NA NA
Protected Phases 8 5 2 6
Permitted Phases 8 2
Lanes, Volumes, Timings No-Build (2028) PM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 8 8 5 2 6
Switch Phase
Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0
Minimum Split (s) 22.5 22.5 9.5 22.5 22.5
Total Split (s) 27.0 27.0 10.0 73.0 63.0
Total Split (%) 27.0% 27.0% 10.0% 73.0% 63.0%
Maximum Green (s) 22.5 22.5 5.5 68.5 58.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None C-Max C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 21.9 69.1 69.1 61.1
Actuated g/C Ratio 0.22 0.69 0.69 0.61
v/c Ratio 0.88 0.34 0.44 0.90
Control Delay (s/veh) 48.6 7.7 2.0 30.5
Queue Delay 0.0 0.0 0.5 0.0
Total Delay (s/veh) 48.6 7.7 2.4 30.5
LOS D A A C
Approach Delay (s/veh) 48.6 3.0 30.5
Approach LOS D A C
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 38 (38%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.90
Intersection Signal Delay (s/veh): 28.4 Intersection LOS: C
Intersection Capacity Utilization 82.8% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 1: NE Main Street (SC 417) & College Street
Lanes, Volumes, Timings No-Build (2028) PM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 5 2 4 5 5 5 10000 4 5 4 2 2 1 3 3 3 5 5 10
F u t u r e V o l u m e ( v p h ) 5 2 4 5 5 5 10000 4 5 4 2 2 1 3 3 3 5 5 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 225 0
Storage Lanes 0 0 0 0 0 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.986 0.956
Flt Protected 0.995 0.950
S a t d . F l o w ( p r o t ) 0 3 4 7 200000 1781 0 1770 1863 0
Flt Permitted 0.995 0.144
S a t d . F l o w ( p e r m ) 0 3 4 7 200000 1781 0 268 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 10 33
Link Speed (mph) 25 25 35 35
Link Distance (ft) 85 379 1084 570
Travel Time (s) 2.3 10.3 21.1 11.1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 5 8 5 0 6 5 70000 5 0 4 2 4 6 3 7 0 6 1 20
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 62 100000 7 5 00 3 7 0 6 1 20
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 2 1 2
Detector Template Left Thru Thru Left Thru
Leading Detector (ft) 20 100 100 20 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA NA pm+pt NA
Protected Phases 4 2 1 6
Permitted Phases 4 6
Lanes, Volumes, Timings No-Build (2028) PM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 9.5 22.5
Total Split (s) 25.0 25.0 52.0 23.0 75.0
Total Split (%) 25.0% 25.0% 52.0% 23.0% 75.0%
Maximum Green (s) 20.5 20.5 47.5 18.5 70.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 20.0 48.0 71.0 71.0
Actuated g/C Ratio 0.20 0.48 0.71 0.71
v/c Ratio 0.88 0.86 0.79 0.46
Control Delay (s/veh) 54.0 34.1 20.2 1.5
Queue Delay 0.0 0.0 0.7 0.4
Total Delay (s/veh) 54.0 34.1 21.0 1.9
LOS D C C A
Approach Delay (s/veh) 54.0 34.1 9.1
Approach LOS D C A
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 39 (39%), Referenced to phase 2:NBT and 6:SBTL, Start of Green
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay (s/veh): 28.9 Intersection LOS: C
Intersection Capacity Utilization 82.8% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street
Lanes, Volumes, Timings No-Build (2028) PM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 5
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 0 0 138 576 21 0
Future Volume (vph) 0 0 138 576 21 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00
Frt
Flt Protected 0.990 0.950
Satd. Flow (prot) 0 0 0 3504 1770 0
Flt Permitted 0.990 0.950
Satd. Flow (perm) 0 0 0 3504 1770 0
Link Speed (mph) 25 25 25
Link Distance (ft) 413 1158 568
Travel Time (s) 11.3 31.6 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 153 640 23 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 793 23 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 29.9% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC No-Build (2028) PM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 6
Intersection
Int Delay, s/veh 0.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 138 576 21 0
Future Vol, veh/h 0 0 138 576 21 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 153 640 23 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 626 -
Stage 1 - - 0 -
Stage 2 - - 626 -
Critical Hdwy 4.14 - 6.84 -
C r i t i c a l H d w y S t g 1 ----
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 416 0
Stage 1 - - - 0
Stage 2 - - 495 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 416 -
Mov Cap-2 Maneuver - - 416 -
Stage 1 ----
Stage 2 - - 495 -
Approach WB NB
HCM Ctrl Dly, s/v 14.2
HCM LOS B
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 416 - -
HCM Lane V/C Ratio 0.056 - -
HCM Ctrl Dly (s/v) 14.2 - -
HCM Lane LOS B - -
HCM 95th %tile Q (veh) 0.2 - -
Lanes, Volumes, Timings No-Build (2028) PM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 1 7 9 2 6 1 5 30000 2 9 2 8 1 1 1 4 1 00
F u t u r e V o l u m e ( v p h ) 1 7 9 2 6 1 5 30000 2 9 2 8 1 1 1 4 1 00
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.979 0.878
Flt Protected 0.999 0.956
S a t d . F l o w ( p r o t ) 0 3 4 6 100000 1635 0 0 1781 0
Flt Permitted 0.999 0.956
S a t d . F l o w ( p e r m ) 0 3 4 6 100000 1635 0 0 1781 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 23 165
Link Speed (mph) 25 25 25 25
Link Distance (ft) 379 1213 1024 568
Travel Time (s) 10.3 33.1 27.9 15.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 19 1029 17 00000 3 2 3 1 2 1 2 7 1 10
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 121 800000 3 4 400 1 3 80
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 1 1
Detector Template Left Thru Left
Leading Detector (ft) 20 100 30 20 30
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 30 20 30
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94
Detector 2 Size(ft) 6
Detector 2 Type Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0
Turn Type Perm NA NA Split NA
Protected Phases 2 4 8 8
Permitted Phases 2
Detector Phase 2 2 4 8 8
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0
Lanes, Volumes, Timings No-Build (2028) PM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Split (s) 22.5 22.5 22.5 22.5 22.5
Total Split (s) 49.2 49.2 28.0 22.8 22.8
Total Split (%) 49.2% 49.2% 28.0% 22.8% 22.8%
Maximum Green (s) 44.7 44.7 23.5 18.3 18.3
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode C-Max C-Max None None None
Walk Time (s) 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0
Act Effct Green (s) 56.8 16.7 13.0
Actuated g/C Ratio 0.57 0.17 0.13
v/c Ratio 0.62 0.84 0.60
Control Delay (s/veh) 9.8 38.3 51.2
Queue Delay 0.5 0.0 0.0
Total Delay (s/veh) 10.2 38.3 51.2
LOS B D D
Approach Delay (s/veh) 10.2 38.3 51.2
Approach LOS B D D
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.84
Intersection Signal Delay (s/veh): 19.2 Intersection LOS: B
Intersection Capacity Utilization 67.9% ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 4: Hedge Street & Curtis Street
Lanes, Volumes, Timings No-Build (2028) PM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 59 445 4 45 3 0 0 15 30
Future Volume (vph) 0 0 0 59 445 4 45 3 0 0 15 30
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.911
Flt Protected 0.994 0.955
S a t d . F l o w ( p r o t ) 0000 3514 0 0 1779 0 0 1697 0
Flt Permitted 0.994 0.955
S a t d . F l o w ( p e r m ) 0000 3514 0 0 1779 0 0 1697 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1082 82 565 1260
Travel Time (s) 29.5 2.2 15.4 34.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 66 494 4 50 3 0 0 17 33
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 5 6 400 5 300 5 00
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.1% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC No-Build (2028) PM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 10
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 000 5 9 4 4 54 4 5300 1 5 3 0
F u t u r e V o l , v e h / h 000 5 9 4 4 54 4 5300 1 5 3 0
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 000 6 6 4 9 44 5 0300 1 7 3 3
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 388 630 - - 628 249
Stage 1 - - - 0 0 - - 628 -
Stage 2 - - - 388 630 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
C r i t i c a l H d w y S t g 1 ------- 5 . 5 4-
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 545 397 0 0 398 751
Stage 1 ----- 0 0 4 7 4-
Stage 2 - - - 607 473 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 504 397 - - 398 751
Mov Cap-2 Maneuver - - - 504 397 - - 398 -
Stage 1 ------- 4 7 4-
Stage 2 - - - 560 473 - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 13.1 11.8
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1
Capacity (veh/h) 496 - - - 580
HCM Lane V/C Ratio 0.108 - - - 0.086
HCM Ctrl Dly (s/v) 13.1 - - - 11.8
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.4 - - - 0.3
Lanes, Volumes, Timings No-Build (2028) PM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 7 5 0 1400003 3 1 2 7 3 10
F u t u r e V o l u m e ( v p h ) 7 5 0 1400003 3 1 2 7 3 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.876
Flt Protected 0.999 0.977
S a t d . F l o w ( p r o t ) 0 3 5 3 200000 1632 0 0 1820 0
Flt Permitted 0.999 0.977
S a t d . F l o w ( p e r m ) 0 3 5 3 200000 1632 0 0 1820 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1197 85 1027 565
Travel Time (s) 32.6 2.3 28.0 15.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 8 5 5 7400003 3 4 3 0 3 40
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 56 900000 3 700 6 40
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.6% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC No-Build (2028) PM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 12
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 7 5 0 1400003 3 1 2 7 3 10
F u t u r e V o l , v e h / h 7 5 0 1400003 3 1 2 7 3 10
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 8 5 5 7400003 3 4 3 0 3 40
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 0 0 0 - 575 281 296 577 -
Stage 1 - - - - 575 - 0 0 -
Stage 2 - - - - 0 - 296 577 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
C r i t i c a l H d w y S t g 1 --- - 5 . 5 4----
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver - - - 0 427 716 634 426 0
Stage 1 - - - 0 501 - - - 0
Stage 2 - - - 0 - - 688 500 0
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - - 427 716 600 426 -
Mov Cap-2 Maneuver - - - - 427 - 600 426 -
Stage 1 - - - - 501 - - - -
Stage 2 - - - - - - 651 500 -
Approach EB NB SB
HCM Ctrl Dly, s/v 10.6 13.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1
Capacity (veh/h) 676 - - - 492
HCM Lane V/C Ratio 0.056 - - - 0.131
HCM Ctrl Dly (s/v) 10.6 - - - 13.4
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.2 - - - 0.4
Lanes, Volumes, Timings Build (2028) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 129 472 352 30 495 0 0 620 42
Future Volume (vph) 0 0 0 129 472 352 30 495 0 0 620 42
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 125 0
Storage Lanes 0 0 0 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.945 0.991
Flt Protected 0.993 0.950
S a t d . F l o w ( p r o t ) 0000 3321 0 1770 1863 0 0 1846 0
Flt Permitted 0.993 0.179
S a t d . F l o w ( p e r m ) 0000 3321 0 333 1863 0 0 1846 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 128 5
Link Speed (mph) 25 25 35 35
Link Distance (ft) 82 314 570 1253
Travel Time (s) 2.2 8.6 11.1 24.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 143 524 391 33 550 0 0 689 47
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 1058 0 33 550 0 0 736 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 2
Detector Template Left Thru Left Thru Thru
Leading Detector (ft) 20 100 20 100 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA pm+pt NA NA
Protected Phases 8 5 2 6
Permitted Phases 8 2
Lanes, Volumes, Timings Build (2028) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 8 8 5 2 6
Switch Phase
Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0
Minimum Split (s) 22.5 22.5 9.5 22.5 22.5
Total Split (s) 38.0 38.0 9.6 62.0 52.4
Total Split (%) 38.0% 38.0% 9.6% 62.0% 52.4%
Maximum Green (s) 33.5 33.5 5.1 57.5 47.9
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None C-Max C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 32.7 58.3 58.3 52.5
Actuated g/C Ratio 0.33 0.58 0.58 0.53
v/c Ratio 0.90 0.12 0.51 0.76
Control Delay (s/veh) 39.8 3.1 4.0 26.5
Queue Delay 0.0 0.0 0.1 0.0
Total Delay (s/veh) 39.8 3.1 4.2 26.5
LOS D A A C
Approach Delay (s/veh) 39.8 4.1 26.5
Approach LOS D A C
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 14 (14%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.90
Intersection Signal Delay (s/veh): 26.9 Intersection LOS: C
Intersection Capacity Utilization 78.7% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 1: NE Main Street (SC 417) & College Street
Lanes, Volumes, Timings Build (2028) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 6 5 3 3 9 2 70000 4 4 1 6 7 1 9 9 5 4 00
F u t u r e V o l u m e ( v p h ) 6 5 3 3 9 2 70000 4 4 1 6 7 1 9 9 5 4 00
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 225 0
Storage Lanes 0 0 0 0 0 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.991 0.982
Flt Protected 0.993 0.950
S a t d . F l o w ( p r o t ) 0 3 4 8 300000 1829 0 1770 1863 0
Flt Permitted 0.993 0.326
S a t d . F l o w ( p e r m ) 0 3 4 8 300000 1829 0 607 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 6 11
Link Speed (mph) 25 25 35 35
Link Distance (ft) 85 379 1084 570
Travel Time (s) 2.3 10.3 21.1 11.1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 7 2 3 7 7 3 00000 4 9 0 7 4 2 2 1 6 0 00
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 47 900000 5 6 40 2 2 1 6 0 00
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 2 1 2
Detector Template Left Thru Thru Left Thru
Leading Detector (ft) 20 100 100 20 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA NA pm+pt NA
Protected Phases 4 2 1 6
Permitted Phases 4 6
Lanes, Volumes, Timings Build (2028) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 9.5 22.5
Total Split (s) 27.0 27.0 55.0 18.0 73.0
Total Split (%) 27.0% 27.0% 55.0% 18.0% 73.0%
Maximum Green (s) 22.5 22.5 50.5 13.5 68.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 18.9 54.1 72.1 72.1
Actuated g/C Ratio 0.19 0.54 0.72 0.72
v/c Ratio 0.72 0.57 0.37 0.45
Control Delay (s/veh) 44.0 18.4 2.7 2.2
Queue Delay 0.0 0.0 0.0 0.3
Total Delay (s/veh) 44.0 18.4 2.7 2.5
LOS D B A A
Approach Delay (s/veh) 44.0 18.4 2.6
Approach LOS D B A
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 9 (9%), Referenced to phase 2:NBT and 6:SBTL, Start of Green
Natural Cycle: 60
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.72
Intersection Signal Delay (s/veh): 18.0 Intersection LOS: B
Intersection Capacity Utilization 78.7% ICU Level of Service D
Analysis Period (min) 15
Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street
Lanes, Volumes, Timings Build (2028) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 5
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 0 0 217 893 31 0
Future Volume (vph) 0 0 217 893 31 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00
Frt
Flt Protected 0.990 0.950
Satd. Flow (prot) 0 0 0 3504 1770 0
Flt Permitted 0.990 0.950
Satd. Flow (perm) 0 0 0 3504 1770 0
Link Speed (mph) 25 25 25
Link Distance (ft) 99 1158 256
Travel Time (s) 2.7 31.6 7.0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 241 992 34 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 1233 34 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 41.0% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 6
Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 217 893 31 0
Future Vol, veh/h 0 0 217 893 31 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 241 992 34 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 978 -
Stage 1 - - 0 -
Stage 2 - - 978 -
Critical Hdwy 4.14 - 6.84 -
C r i t i c a l H d w y S t g 1 ----
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 248 0
Stage 1 - - - 0
Stage 2 - - 325 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 248 -
Mov Cap-2 Maneuver - - 248 -
Stage 1 ----
Stage 2 - - 325 -
Approach WB NB
HCM Ctrl Dly, s/v 21.8
HCM LOS C
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 248 - -
HCM Lane V/C Ratio 0.139 - -
HCM Ctrl Dly (s/v) 21.8 - -
HCM Lane LOS C - -
HCM 95th %tile Q (veh) 0.5 - -
Lanes, Volumes, Timings Build (2028) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 2 3 5 0 1 5 40000 3 1 1 9 4 4 9 1 8 50
F u t u r e V o l u m e ( v p h ) 2 3 5 0 1 5 40000 3 1 1 9 4 4 9 1 8 50
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.986 0.883
Flt Protected 0.998 0.990
S a t d . F l o w ( p r o t ) 0 3 4 8 300000 1645 0 0 1844 0
Flt Permitted 0.998 0.990
S a t d . F l o w ( p e r m ) 0 3 4 8 300000 1645 0 0 1844 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 12 216
Link Speed (mph) 25 25 25 25
Link Distance (ft) 379 1213 1024 312
Travel Time (s) 10.3 33.1 27.9 8.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 2 6 5 5 7 6 00000 3 4 2 1 6 5 4 2 0 60
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 64 300000 2 5 000 2 6 00
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 1 1
Detector Template Left Thru Left
Leading Detector (ft) 20 100 30 20 30
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 30 20 30
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94
Detector 2 Size(ft) 6
Detector 2 Type Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0
Turn Type Perm NA NA Split NA
Protected Phases 2 4 8 8
Permitted Phases 2
Detector Phase 2 2 4 8 8
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0
Lanes, Volumes, Timings Build (2028) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Split (s) 22.5 22.5 22.5 22.5 22.5
Total Split (s) 38.0 38.0 29.0 33.0 33.0
Total Split (%) 38.0% 38.0% 29.0% 33.0% 33.0%
Maximum Green (s) 33.5 33.5 24.5 28.5 28.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode C-Max C-Max None None None
Walk Time (s) 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0
Act Effct Green (s) 57.3 9.8 19.3
Actuated g/C Ratio 0.57 0.10 0.19
v/c Ratio 0.32 0.70 0.73
Control Delay (s/veh) 7.4 19.9 49.5
Queue Delay 0.2 0.0 0.0
Total Delay (s/veh) 7.6 19.9 49.5
LOS A B D
Approach Delay (s/veh) 7.6 19.9 49.5
Approach LOS A B D
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 76 (76%), Referenced to phase 2:EBTL, Start of Green
Natural Cycle: 70
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.73
Intersection Signal Delay (s/veh): 19.7 Intersection LOS: B
Intersection Capacity Utilization 53.5% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 4: Hedge Street & Curtis Street
Lanes, Volumes, Timings Build (2028) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 27 508 10 32 5 0 0 1 22
Future Volume (vph) 0 0 0 27 508 10 32 5 0 0 1 22
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.997 0.870
Flt Protected 0.998 0.959
S a t d . F l o w ( p r o t ) 0000 3522 0 0 1786 0 0 1621 0
Flt Permitted 0.998 0.959
S a t d . F l o w ( p e r m ) 0000 3522 0 0 1786 0 0 1621 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1082 82 565 1260
Travel Time (s) 29.5 2.2 15.4 34.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 30 564 11 36 6 0 0 1 24
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 6 0 500 4 200 2 50
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.5% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 10
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 000 2 7 5 0 8 1 0 3 25001 2 2
F u t u r e V o l , v e h / h 000 2 7 5 0 8 1 0 3 25001 2 2
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 000 3 0 5 6 4 1 1 3 66001 2 4
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 343 635 - - 630 288
Stage 1 - - - 0 0 - - 630 -
Stage 2 - - - 343 635 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
C r i t i c a l H d w y S t g 1 ------- 5 . 5 4-
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 587 394 0 0 397 709
Stage 1 ----- 0 0 4 7 3-
Stage 2 - - - 646 471 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 565 394 - - 397 709
Mov Cap-2 Maneuver - - - 565 394 - - 397 -
Stage 1 ------- 4 7 3-
Stage 2 - - - 622 471 - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 12.3 10.5
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1
Capacity (veh/h) 534 - - - 686
HCM Lane V/C Ratio 0.077 - - - 0.037
HCM Ctrl Dly (s/v) 12.3 - - - 10.5
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.2 - - - 0.1
Lanes, Volumes, Timings Build (2028) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 6 4 0 8 1 300007 2 02 1 30
F u t u r e V o l u m e ( v p h ) 6 4 0 8 1 300007 2 02 1 30
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.996 0.901
Flt Protected 0.999 0.994
S a t d . F l o w ( p r o t ) 0 3 5 2 200000 1678 0 0 1852 0
Flt Permitted 0.999 0.994
S a t d . F l o w ( p e r m ) 0 3 5 2 200000 1678 0 0 1852 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1197 85 1027 565
Travel Time (s) 32.6 2.3 28.0 15.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 7 4 5 3 1 400008 2 22 1 40
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 47 400000 3 000 1 60
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 21.9% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 12
Intersection
Int Delay, s/veh 1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 6 4 0 8 1 300007 2 02 1 30
F u t u r e V o l , v e h / h 6 4 0 8 1 300007 2 02 1 30
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 7 4 5 3 1 400008 2 22 1 40
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 0 0 0 - 474 234 245 481 -
Stage 1 - - - - 474 - 0 0 -
Stage 2 - - - - 0 - 245 481 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
C r i t i c a l H d w y S t g 1 --- - 5 . 5 4----
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver - - - 0 488 768 688 483 0
Stage 1 - - - 0 556 - - - 0
Stage 2 - - - 0 - - 737 552 0
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - - 488 768 660 483 -
Mov Cap-2 Maneuver - - - - 488 - 660 483 -
Stage 1 - - - - 556 - - - -
Stage 2 - - - - - - 706 552 -
Approach EB NB SB
HCM Ctrl Dly, s/v 10.6 12.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1
Capacity (veh/h) 669 - - - 501
HCM Lane V/C Ratio 0.045 - - - 0.033
HCM Ctrl Dly (s/v) 10.6 - - - 12.4
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.1 - - - 0.1
Lanes, Volumes, Timings Build (2028) AM
11: Hedge Street & Access A Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 13
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 7 17 22 32 217 4
Future Volume (vph) 7 17 22 32 217 4
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.905 0.998
Flt Protected 0.985 0.980
Satd. Flow (prot) 1660 0 0 1825 1859 0
Flt Permitted 0.985 0.980
Satd. Flow (perm) 1660 0 0 1825 1859 0
Link Speed (mph) 25 25 25
Link Distance (ft) 1169 312 256
Travel Time (s) 31.9 8.5 7.0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 8 19 24 36 241 4
Shared Lane Traffic (%)
Lane Group Flow (vph) 27 0 0 60 245 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 0 0
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 28.3% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
11: Hedge Street & Access A Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 14
Intersection
Int Delay, s/veh 1.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 17 22 32 217 4
Future Vol, veh/h 7 17 22 32 217 4
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 19 24 36 241 4
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 327 243 245 0 - 0
Stage 1 243 -----
Stage 2 84 -----
Critical Hdwy 6.42 6.22 4.12 - - -
C r i t i c a l H d w y S t g 1 5 . 4 2-----
C r i t i c a l H d w y S t g 2 5 . 4 2-----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 667 796 1321 - - -
Stage 1 797 -----
Stage 2 939 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 654 796 1321 - - -
Mov Cap-2 Maneuver 654 -----
Stage 1 782 -----
Stage 2 939 -----
Approach EB NB SB
HCM Ctrl Dly, s/v 10 3.2 0
HCM LOS B
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1321 - 749 - -
HCM Lane V/C Ratio 0.019 - 0.036 - -
HCM Ctrl Dly (s/v) 7.8 0 10 - -
HCM Lane LOS A A B - -
HCM 95th %tile Q (veh) 0.1 - 0.1 - -
Lanes, Volumes, Timings Build (2028) AM
18: Access B & College Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 15
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 0 0 3 921 25 0
Future Volume (vph) 0 0 3 921 25 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00
Frt
Flt Protected 0.950
Satd. Flow (prot) 0 0 0 3539 1770 0
Flt Permitted 0.950
Satd. Flow (perm) 0 0 0 3539 1770 0
Link Speed (mph) 25 25 30
Link Distance (ft) 314 99 1024
Travel Time (s) 8.6 2.7 23.3
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 3 1023 28 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 1026 28 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 35.5% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
18: Access B & College Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 16
Intersection
Int Delay, s/veh 0.3
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 3 921 25 0
Future Vol, veh/h 0 0 3 921 25 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 3 1023 28 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 518 -
Stage 1 - - 0 -
Stage 2 - - 518 -
Critical Hdwy 4.14 - 6.84 -
C r i t i c a l H d w y S t g 1 ----
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 487 0
Stage 1 - - - 0
Stage 2 - - 563 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 487 -
Mov Cap-2 Maneuver - - 487 -
Stage 1 ----
Stage 2 - - 563 -
Approach WB NB
HCM Ctrl Dly, s/v 12.8
HCM LOS B
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 487 - -
HCM Lane V/C Ratio 0.057 - -
HCM Ctrl Dly (s/v) 12.8 - -
HCM Lane LOS B - -
HCM 95th %tile Q (veh) 0.2 - -
Lanes, Volumes, Timings Build (2028) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 1
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 85 383 186 59 506 0 0 857 77
Future Volume (vph) 0 0 0 85 383 186 59 506 0 0 857 77
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 125 0
Storage Lanes 0 0 0 0 1 0 0 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.957 0.989
Flt Protected 0.994 0.950
S a t d . F l o w ( p r o t ) 0000 3367 0 1770 1863 0 0 1842 0
Flt Permitted 0.994 0.063
S a t d . F l o w ( p e r m ) 0000 3367 0 117 1863 0 0 1842 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 55 8
Link Speed (mph) 25 25 35 35
Link Distance (ft) 82 313 570 1253
Travel Time (s) 2.2 8.5 11.1 24.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 94 426 207 66 562 0 0 952 86
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 7 2 70 6 6 5 6 200 1038 0
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 2 2
Detector Template Left Thru Left Thru Thru
Leading Detector (ft) 20 100 20 100 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 20 6 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA pm+pt NA NA
Protected Phases 8 5 2 6
Permitted Phases 8 2
Lanes, Volumes, Timings Build (2028) AM
1: NE Main Street (SC 417) & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 2
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 8 8 5 2 6
Switch Phase
Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0
Minimum Split (s) 22.5 22.5 9.5 22.5 22.5
Total Split (s) 27.0 27.0 10.0 73.0 63.0
Total Split (%) 27.0% 27.0% 10.0% 73.0% 63.0%
Maximum Green (s) 22.5 22.5 5.5 68.5 58.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lag Lead
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None None C-Max C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 22.3 68.7 68.7 60.7
Actuated g/C Ratio 0.22 0.69 0.69 0.61
v/c Ratio 0.92 0.39 0.44 0.93
Control Delay (s/veh) 52.9 13.1 2.0 34.0
Queue Delay 0.0 0.0 0.5 0.0
Total Delay (s/veh) 52.9 13.1 2.5 34.0
LOS D B A C
Approach Delay (s/veh) 52.9 3.6 34.0
Approach LOS D A C
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 38 (38%), Referenced to phase 2:NBTL and 6:SBT, Start of Green
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.93
Intersection Signal Delay (s/veh): 31.8 Intersection LOS: C
Intersection Capacity Utilization 85.2% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 1: NE Main Street (SC 417) & College Street
Lanes, Volumes, Timings Build (2028) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 3
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 5 2 4 7 0 5 10000 4 5 4 2 3 3 3 5 6 5 6 00
F u t u r e V o l u m e ( v p h ) 5 2 4 7 0 5 10000 4 5 4 2 3 3 3 5 6 5 6 00
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 150 0 225 0
Storage Lanes 0 0 0 0 0 0 1 0
Taper Length (ft) 100 100 100 100
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.987 0.954
Flt Protected 0.995 0.950
S a t d . F l o w ( p r o t ) 0 3 4 7 600000 1777 0 1770 1863 0
Flt Permitted 0.995 0.131
S a t d . F l o w ( p e r m ) 0 3 4 7 600000 1777 0 244 1863 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 9 35
Link Speed (mph) 25 25 35 35
Link Distance (ft) 85 379 1084 570
Travel Time (s) 2.3 10.3 21.1 11.1
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 5 8 5 2 2 5 70000 5 0 4 2 5 9 3 9 6 6 2 20
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 63 700000 7 6 30 3 9 6 6 2 20
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 12 12
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 2 1 2
Detector Template Left Thru Thru Left Thru
Leading Detector (ft) 20 100 100 20 100
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 6 20 6
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94 94 94
Detector 2 Size(ft) 6 6 6
Detector 2 Type Cl+Ex Cl+Ex Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0 0.0 0.0
Turn Type Perm NA NA pm+pt NA
Protected Phases 4 2 1 6
Permitted Phases 4 6
Lanes, Volumes, Timings Build (2028) AM
2: NE Main Street (SC 417) & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 4
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Detector Phase 4 4 2 1 6
Switch Phase
Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0
Minimum Split (s) 22.5 22.5 22.5 9.5 22.5
Total Split (s) 25.0 25.0 52.0 23.0 75.0
Total Split (%) 25.0% 25.0% 52.0% 23.0% 75.0%
Maximum Green (s) 20.5 20.5 47.5 18.5 70.5
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag
Lead-Lag Optimize? Yes Yes
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode None None C-Max None C-Max
Walk Time (s) 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0
Act Effct Green (s) 20.3 47.7 70.7 70.7
Actuated g/C Ratio 0.20 0.48 0.71 0.71
v/c Ratio 0.89 0.88 0.87 0.47
Control Delay (s/veh) 54.9 36.3 26.1 1.5
Queue Delay 0.0 0.0 4.2 0.5
Total Delay (s/veh) 54.9 36.3 30.3 1.9
LOS D D C A
Approach Delay (s/veh) 54.9 36.3 13.0
Approach LOS D D B
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 39 (39%), Referenced to phase 2:NBT and 6:SBTL, Start of Green
Natural Cycle: 90
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.89
Intersection Signal Delay (s/veh): 31.4 Intersection LOS: C
Intersection Capacity Utilization 85.2% ICU Level of Service E
Analysis Period (min) 15
Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street
Lanes, Volumes, Timings Build (2028) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 5
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 0 0 150 584 30 0
Future Volume (vph) 0 0 150 584 30 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00
Frt
Flt Protected 0.990 0.950
Satd. Flow (prot) 0 0 0 3504 1770 0
Flt Permitted 0.990 0.950
Satd. Flow (perm) 0 0 0 3504 1770 0
Link Speed (mph) 25 25 25
Link Distance (ft) 100 1158 256
Travel Time (s) 2.7 31.6 7.0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 167 649 33 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 816 33 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.5% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
3: Hedge Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 6
Intersection
Int Delay, s/veh 0.6
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 150 584 30 0
Future Vol, veh/h 0 0 150 584 30 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 167 649 33 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 659 -
Stage 1 - - 0 -
Stage 2 - - 659 -
Critical Hdwy 4.14 - 6.84 -
C r i t i c a l H d w y S t g 1 ----
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 397 0
Stage 1 - - - 0
Stage 2 - - 476 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 397 -
Mov Cap-2 Maneuver - - 397 -
Stage 1 ----
Stage 2 - - 476 -
Approach WB NB
HCM Ctrl Dly, s/v 14.9
HCM LOS B
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 397 - -
HCM Lane V/C Ratio 0.084 - -
HCM Ctrl Dly (s/v) 14.9 - -
HCM Lane LOS B - -
HCM 95th %tile Q (veh) 0.3 - -
Lanes, Volumes, Timings Build (2028) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 7
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 6 7 9 2 6 1 5 30000 3 6 2 8 1 1 3 0 1 60
F u t u r e V o l u m e ( v p h ) 6 7 9 2 6 1 5 30000 3 6 2 8 1 1 3 0 1 60
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.980 0.880
Flt Protected 0.997 0.957
S a t d . F l o w ( p r o t ) 0 3 4 5 800000 1639 0 0 1783 0
Flt Permitted 0.997 0.957
S a t d . F l o w ( p e r m ) 0 3 4 5 800000 1639 0 0 1783 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 22 150
Link Speed (mph) 25 25 25 25
Link Distance (ft) 379 1213 1024 312
Travel Time (s) 10.3 33.1 27.9 8.5
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 74 1029 17 00000 4 0 3 1 2 1 4 4 1 80
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 127 300000 3 5 200 1 6 20
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Number of Detectors 1 2 1 1 1
Detector Template Left Thru Left
Leading Detector (ft) 20 100 30 20 30
Trailing Detector (ft) 0 0 0 0 0
Detector 1 Position(ft) 0 0 0 0 0
Detector 1 Size(ft) 20 6 30 20 30
Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex
Detector 1 Channel
Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0
Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0
Detector 2 Position(ft) 94
Detector 2 Size(ft) 6
Detector 2 Type Cl+Ex
Detector 2 Channel
Detector 2 Extend (s) 0.0
Turn Type Perm NA NA Split NA
Protected Phases 2 4 8 8
Permitted Phases 2
Detector Phase 2 2 4 8 8
Switch Phase
Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0
Lanes, Volumes, Timings Build (2028) AM
4: Hedge Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 8
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Minimum Split (s) 22.5 22.5 22.5 22.5 22.5
Total Split (s) 49.2 49.2 28.0 22.8 22.8
Total Split (%) 49.2% 49.2% 28.0% 22.8% 22.8%
Maximum Green (s) 44.7 44.7 23.5 18.3 18.3
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5
Lead/Lag
Lead-Lag Optimize?
Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0
Recall Mode C-Max C-Max None None None
Walk Time (s) 7.0 7.0 7.0 7.0 7.0
Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0
Pedestrian Calls (#/hr) 0 0 0 0 0
Act Effct Green (s) 54.7 17.8 14.0
Actuated g/C Ratio 0.55 0.18 0.14
v/c Ratio 0.67 0.85 0.65
Control Delay (s/veh) 10.6 41.1 52.4
Queue Delay 0.7 0.0 0.0
Total Delay (s/veh) 11.2 41.1 52.4
LOS B D D
Approach Delay (s/veh) 11.2 41.1 52.4
Approach LOS B D D
Intersection Summary
Area Type: Other
Cycle Length: 100
Actuated Cycle Length: 100
Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green
Natural Cycle: 80
Control Type: Actuated-Coordinated
Maximum v/c Ratio: 0.85
Intersection Signal Delay (s/veh): 20.8 Intersection LOS: C
Intersection Capacity Utilization 71.0% ICU Level of Service C
Analysis Period (min) 15
Splits and Phases: 4: Hedge Street & Curtis Street
Lanes, Volumes, Timings Build (2028) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 9
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 59 457 4 45 3 0 0 15 30
Future Volume (vph) 0 0 0 59 457 4 45 3 0 0 15 30
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.911
Flt Protected 0.994 0.955
S a t d . F l o w ( p r o t ) 0000 3514 0 0 1779 0 0 1697 0
Flt Permitted 0.994 0.955
S a t d . F l o w ( p e r m ) 0000 3514 0 0 1779 0 0 1697 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1082 82 565 1260
Travel Time (s) 29.5 2.2 15.4 34.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 0 66 508 4 50 3 0 0 17 33
Shared Lane Traffic (%)
Lane Group Flow (vph) 0000 5 7 800 5 300 5 00
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 30.5% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
5: Main Street & College Street Bur dette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 10
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 000 5 9 4 5 74 4 5300 1 5 3 0
F u t u r e V o l , v e h / h 000 5 9 4 5 74 4 5300 1 5 3 0
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 000 6 6 5 0 84 5 0300 1 7 3 3
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 395 644 - - 642 256
Stage 1 - - - 0 0 - - 642 -
Stage 2 - - - 395 644 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
C r i t i c a l H d w y S t g 1 ------- 5 . 5 4-
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 539 390 0 0 391 743
Stage 1 ----- 0 0 4 6 7-
Stage 2 - - - 602 466 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 498 390 - - 391 743
Mov Cap-2 Maneuver - - - 498 390 - - 391 -
Stage 1 ------- 4 6 7-
Stage 2 - - - 554 466 - - - -
Approach WB NB SB
HCM Ctrl Dly, s/v 13.2 11.9
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1
Capacity (veh/h) 490 - - - 572
HCM Lane V/C Ratio 0.109 - - - 0.087
HCM Ctrl Dly (s/v) 13.2 - - - 11.9
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.4 - - - 0.3
Lanes, Volumes, Timings Build (2028) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 11
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l u m e ( v p h ) 7 5 1 6400003 3 1 2 7 3 10
F u t u r e V o l u m e ( v p h ) 7 5 1 6400003 3 1 2 7 3 10
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.999 0.876
Flt Protected 0.999 0.977
S a t d . F l o w ( p r o t ) 0 3 5 3 200000 1632 0 0 1820 0
Flt Permitted 0.999 0.977
S a t d . F l o w ( p e r m ) 0 3 5 3 200000 1632 0 0 1820 0
Link Speed (mph) 25 25 25 25
Link Distance (ft) 1197 85 1027 565
Travel Time (s) 32.6 2.3 28.0 15.4
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90
A d j . F l o w ( v p h ) 8 5 7 3400003 3 4 3 0 3 40
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 58 500000 3 700 6 40
Enter Blocked Intersection No No No No No No No No No No No No
Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right
Median Width(ft) 0 0 0 0
Link Offset(ft) 0 0 0 0
Crosswalk Width(ft) 16 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9 15 9 15 9
Sign Control Free Free Stop Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 31.1% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
6: Main Street & Curtis Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 12
Intersection
Int Delay, s/veh 1.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
T r a f f i c V o l , v e h / h 7 5 1 6400003 3 1 2 7 3 10
F u t u r e V o l , v e h / h 7 5 1 6400003 3 1 2 7 3 10
C o n f l i c t i n g P e d s , # / h r 000000000000
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - -----------
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
H e a v y V e h i c l e s , % 222222222222
M v m t F l o w 8 5 7 3400003 3 4 3 0 3 40
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 0 0 0 - 591 289 304 593 -
Stage 1 - - - - 591 - 0 0 -
Stage 2 - - - - 0 - 304 593 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
C r i t i c a l H d w y S t g 1 --- - 5 . 5 4----
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver - - - 0 418 708 625 417 0
Stage 1 - - - 0 493 - - - 0
Stage 2 - - - 0 - - 681 492 0
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - - 418 708 591 417 -
Mov Cap-2 Maneuver - - - - 418 - 591 417 -
Stage 1 - - - - 493 - - - -
Stage 2 - - - - - - 643 492 -
Approach EB NB SB
HCM Ctrl Dly, s/v 10.7 13.6
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1
Capacity (veh/h) 667 - - - 483
HCM Lane V/C Ratio 0.057 - - - 0.133
HCM Ctrl Dly (s/v) 10.7 - - - 13.6
HCM Lane LOS B - - - B
HCM 95th %tile Q (veh) 0.2 - - - 0.5
Lanes, Volumes, Timings Build (2028) AM
11: Hedge Street & Access A Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 13
Lane Group EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Volume (vph) 9 22 57 46 138 12
Future Volume (vph) 9 22 57 46 138 12
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00
Frt 0.905 0.989
Flt Protected 0.986 0.973
Satd. Flow (prot) 1662 0 0 1812 1842 0
Flt Permitted 0.986 0.973
Satd. Flow (perm) 1662 0 0 1812 1842 0
Link Speed (mph) 25 25 25
Link Distance (ft) 1169 312 256
Travel Time (s) 31.9 8.5 7.0
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 10 24 63 51 153 13
Shared Lane Traffic (%)
Lane Group Flow (vph) 34 0 0 114 166 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 12 0 0
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 15 9 15 9
Sign Control Stop Free Free
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 26.9% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
11: Hedge Street & Access A Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 14
Intersection
Int Delay, s/veh 2.6
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 9 22 57 46 138 12
Future Vol, veh/h 9 22 57 46 138 12
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 -----
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 10 24 63 51 153 13
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 337 160 166 0 - 0
Stage 1 160 -----
Stage 2 177 -----
Critical Hdwy 6.42 6.22 4.12 - - -
C r i t i c a l H d w y S t g 1 5 . 4 2-----
C r i t i c a l H d w y S t g 2 5 . 4 2-----
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 658 885 1412 - - -
Stage 1 869 -----
Stage 2 854 -----
Platoon blocked, % - - -
Mov Cap-1 Maneuver 628 885 1412 - - -
Mov Cap-2 Maneuver 628 -----
Stage 1 829 -----
Stage 2 854 -----
Approach EB NB SB
HCM Ctrl Dly, s/v 9.8 4.2 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1412 - 791 - -
HCM Lane V/C Ratio 0.045 - 0.044 - -
HCM Ctrl Dly (s/v) 7.7 0 9.8 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q (veh) 0.1 - 0.1 - -
Lanes, Volumes, Timings Build (2028) AM
18: Access B & College Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 15
Lane Group EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Volume (vph) 0 0 8 606 31 0
Future Volume (vph) 0 0 8 606 31 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00
Frt
Flt Protected 0.999 0.950
Satd. Flow (prot) 0 0 0 3536 1770 0
Flt Permitted 0.999 0.950
Satd. Flow (perm) 0 0 0 3536 1770 0
Link Speed (mph) 25 25 25
Link Distance (ft) 313 100 1023
Travel Time (s) 8.5 2.7 27.9
Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90
Adj. Flow (vph) 0 0 9 673 34 0
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 682 34 0
Enter Blocked Intersection No No No No No No
Lane Alignment Left Right Left Left Left Right
Median Width(ft) 0 0 12
Link Offset(ft) 0 0 0
Crosswalk Width(ft) 16 16 16
Two way Left Turn Lane
Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00
Turning Speed (mph) 9 15 15 9
Sign Control Free Free Stop
Intersection Summary
Area Type: Other
Control Type: Unsignalized
Intersection Capacity Utilization 27.0% ICU Level of Service A
Analysis Period (min) 15
HCM 6th TWSC Build (2028) AM
18: Access B & College Street Burdette North TIS
10/16/2025 Synchro 12 Report
Impact Designs, Inc. Page 16
Intersection
Int Delay, s/veh 0.5
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 8 606 31 0
Future Vol, veh/h 0 0 8 606 31 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 9 673 34 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 355 -
Stage 1 - - 0 -
Stage 2 - - 355 -
Critical Hdwy 4.14 - 6.84 -
C r i t i c a l H d w y S t g 1 ----
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 617 0
Stage 1 - - - 0
Stage 2 - - 681 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 617 -
Mov Cap-2 Maneuver - - 617 -
Stage 1 ----
Stage 2 - - 681 -
Approach WB NB
HCM Ctrl Dly, s/v 11.2
HCM LOS B
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 617 - -
HCM Lane V/C Ratio 0.056 - -
HCM Ctrl Dly (s/v) 11.2 - -
HCM Lane LOS B - -
HCM 95th %tile Q (veh) 0.2 - -
APPENDIX D
SIMTRAFFIC ANALYSIS REPORTS
Queuing and Blocking Report
Existing (2025) AM 10/16/2025
11 - EX AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 1
Intersection: 1: NE Main Street (SC 417) & College Street
Movement EB WB NB NB SB SB
Directions Served LTR LTR L TR L TR
Maximum Queue (ft) 61 360 31 317 150 329
Average Queue (ft) 31 312 3 132 36 165
95th Queue (ft) 45 419 16 258 91 283
Link Distance (ft) 16 341 507 1225
Upstream Blk Time (%) 48 26
Queuing Penalty (veh) 83 120
Storage Bay Dist (ft) 125 125
Storage Blk Time (%) 10 14
Queuing Penalty (veh) 1 8
Intersection: 2: NE Main Street (SC 417) & Curtis Street
Movement EB WB NB NB SB SB
Directions Served LTR LTR L TR L TR
Maximum Queue (ft) 62 334 67 327 115 175
Average Queue (ft) 31 282 15 158 46 64
95th Queue (ft) 45 392 55 279 90 134
Link Distance (ft) 13 309 1047 507
Upstream Blk Time (%) 54 13
Queuing Penalty (veh) 124 53
Storage Bay Dist (ft) 150 150
Storage Blk Time (%) 9 0 1
Queuing Penalty (veh) 2 0 1
Intersection: 3: Hedge Street & College Street
Movement EB WB NB
Directions Served TR LT LR
Maximum Queue (ft) 15 555 292
Average Queue (ft) 1 245 140
95th Queue (ft) 9 681 412
Link Distance (ft) 341 1137 508
Upstream Blk Time (%) 2 4
Queuing Penalty (veh) 0 3
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Existing (2025) AM 10/16/2025
11 - EX AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 2
Intersection: 4: Hedge Street & Curtis Street
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 194 872 352 225
Average Queue (ft) 89 421 139 114
95th Queue (ft) 167 1018 308 198
Link Distance (ft) 309 1185 990 508
Upstream Blk Time (%) 1 6
Queuing Penalty (veh) 2 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Main Street & College Street
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 209 26 36 57
Average Queue (ft) 83 2 8 18
95th Queue (ft) 177 13 29 65
Link Distance (ft) 1053 16 506 1230
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Main Street & Curtis Street
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 326 30 138 81
Average Queue (ft) 138 2 44 21
95th Queue (ft) 296 15 135 85
Link Distance (ft) 1159 13 988 506
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 398
Queuing and Blocking Report
Existing (2025) PM 10/16/2025
12 - EX PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 1
Intersection: 1: NE Main Street (SC 417) & College Street
Movement EB WB NB NB SB SB
Directions Served LTR LTR L TR L TR
Maximum Queue (ft) 67 355 43 208 224 783
Average Queue (ft) 32 238 7 85 59 265
95th Queue (ft) 48 382 29 165 146 766
Link Distance (ft) 16 341 507 1225
Upstream Blk Time (%) 70 13 8
Queuing Penalty (veh) 166 36 0
Storage Bay Dist (ft) 125 125
Storage Blk Time (%) 3 0 21
Queuing Penalty (veh) 0 2 25
Intersection: 2: NE Main Street (SC 417) & Curtis Street
Movement EB WB NB NB SB SB
Directions Served LTR LTR L TR L TR
Maximum Queue (ft) 46 334 154 375 184 202
Average Queue (ft) 30 299 30 183 75 81
95th Queue (ft) 39 381 109 321 150 167
Link Distance (ft) 13 309 1047 507
Upstream Blk Time (%) 72 39
Queuing Penalty (veh) 207 111
Storage Bay Dist (ft) 150 150
Storage Blk Time (%) 12 1 1
Queuing Penalty (veh) 5 7 2
Intersection: 3: Hedge Street & College Street
Movement EB WB NB
Directions Served TR LT LR
Maximum Queue (ft) 15 529 139
Average Queue (ft) 1 93 35
95th Queue (ft) 7 476 91
Link Distance (ft) 341 1137 508
Upstream Blk Time (%) 3
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Existing (2025) PM 10/16/2025
12 - EX PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 2
Intersection: 4: Hedge Street & Curtis Street
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 272 810 440 258
Average Queue (ft) 130 423 183 117
95th Queue (ft) 232 903 418 214
Link Distance (ft) 309 1185 990 508
Upstream Blk Time (%) 0 2
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Main Street & College Street
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 792 31 161 783
Average Queue (ft) 512 5 67 423
95th Queue (ft) 961 21 175 835
Link Distance (ft) 1053 16 506 1230
Upstream Blk Time (%) 5 11
Queuing Penalty (veh) 0 22
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Main Street & Curtis Street
Movement EB WB NB SB
Directions Served LTR LTR LTR LTR
Maximum Queue (ft) 1193 30 694 488
Average Queue (ft) 949 4 358 332
95th Queue (ft) 1424 21 702 554
Link Distance (ft) 1159 13 988 506
Upstream Blk Time (%) 44 0 0 13
Queuing Penalty (veh) 0102
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 587
Queuing and Blocking Report
No-Build (2028) AM 10/16/2025
21 - NB AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 1
Intersection: 1: NE Main Street (SC 417) & College Street
Movement WB WB NB NB SB
Directions Served LT TR L T TR
Maximum Queue (ft) 372 380 67 219 390
Average Queue (ft) 335 343 20 83 212
95th Queue (ft) 412 406 53 175 336
Link Distance (ft) 342 342 532 1213
Upstream Blk Time (%) 37 43
Queuing Penalty (veh) 167 194
Storage Bay Dist (ft) 150
Storage Blk Time (%) 1
Queuing Penalty (veh) 0
Intersection: 2: NE Main Street (SC 417) & Curtis Street
Movement EB EB NB SB SB
Directions Served LT TR TR L T
Maximum Queue (ft) 38 46 259 123 99
Average Queue (ft) 24 29 89 48 29
95th Queue (ft) 31 38 192 91 77
Link Distance (ft) 10 10 1035 532
Upstream Blk Time (%) 82 81
Queuing Penalty (veh) 174 172
Storage Bay Dist (ft) 225
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 3: Hedge Street & College Street
Movement WB WB NB
Directions Served LT T L
Maximum Queue (ft) 854 834 167
Average Queue (ft) 447 440 51
95th Queue (ft) 1042 1022 172
Link Distance (ft) 1136 1136 531
Upstream Blk Time (%) 8 9
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
No-Build (2028) AM 10/16/2025
21 - NB AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 2
Intersection: 4: Hedge Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 100 105 216 322
Average Queue (ft) 34 42 88 144
95th Queue (ft) 75 88 171 265
Link Distance (ft) 307 307 978 531
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Main Street & College Street
Movement WB WB NB SB
Directions Served LT TR LT TR
Maximum Queue (ft) 7 8 56 40
Average Queue (ft) 0 0 21 17
95th Queue (ft) 5 5 49 44
Link Distance (ft) 17 17 530 1219
Upstream Blk Time (%) 0
Queuing Penalty (veh) 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Main Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 1186 1190 658 205
Average Queue (ft) 947 936 338 86
95th Queue (ft) 1423 1424 661 255
Link Distance (ft) 1155 1155 976 530
Upstream Blk Time (%) 50 49
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 709
Queuing and Blocking Report
No-Build (2028) PM 10/16/2025
22 - NB PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 1
Intersection: 1: NE Main Street (SC 417) & College Street
Movement WB WB NB NB SB
Directions Served LT TR L T TR
Maximum Queue (ft) 364 370 223 480 1245
Average Queue (ft) 334 256 116 200 782
95th Queue (ft) 407 489 267 545 1573
Link Distance (ft) 342 342 532 1213
Upstream Blk Time (%) 74 39 21 47
Queuing Penalty (veh) 222 115 106 0
Storage Bay Dist (ft) 150
Storage Blk Time (%) 40 5
Queuing Penalty (veh) 201 3
Intersection: 2: NE Main Street (SC 417) & Curtis Street
Movement EB EB NB SB SB
Directions Served LT TR TR L T
Maximum Queue (ft) 32 53 906 229 118
Average Queue (ft) 22 29 403 59 20
95th Queue (ft) 31 39 1060 171 76
Link Distance (ft) 10 10 1035 532
Upstream Blk Time (%) 84 79 22
Queuing Penalty (veh) 235 222 0
Storage Bay Dist (ft) 225
Storage Blk Time (%) 0 0
Queuing Penalty (veh) 2 0
Intersection: 3: Hedge Street & College Street
Movement WB WB NB
Directions Served LT T L
Maximum Queue (ft) 1158 1164 183
Average Queue (ft) 765 757 58
95th Queue (ft) 1539 1540 167
Link Distance (ft) 1136 1136 531
Upstream Blk Time (%) 53 52
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
No-Build (2028) PM 10/16/2025
22 - NB PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 2
Intersection: 4: Hedge Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 153 156 293 173
Average Queue (ft) 42 53 118 44
95th Queue (ft) 114 132 216 133
Link Distance (ft) 307 307 978 531
Upstream Blk Time (%)
Queuing Penalty (veh)
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Main Street & College Street
Movement WB WB NB SB
Directions Served LT TR LT TR
Maximum Queue (ft) 34 9 53 507
Average Queue (ft) 14 0 23 190
95th Queue (ft) 33 5 49 550
Link Distance (ft) 17 17 530 1219
Upstream Blk Time (%) 61 0
Queuing Penalty (veh) 156 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Main Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 1193 1195 778 536
Average Queue (ft) 1090 1083 476 462
95th Queue (ft) 1381 1386 821 665
Link Distance (ft) 1155 1155 976 530
Upstream Blk Time (%) 76 75 0 65
Queuing Penalty (veh) 0 0 0 48
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 1310
Queuing and Blocking Report
Build (2028) AM 10/16/2025
31 - BLD AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 1
Intersection: 1: NE Main Street (SC 417) & College Street
Movement WB WB NB NB SB
Directions Served LT TR L T TR
Maximum Queue (ft) 265 269 93 213 383
Average Queue (ft) 225 230 22 75 201
95th Queue (ft) 331 339 62 167 361
Link Distance (ft) 244 244 532 1213
Upstream Blk Time (%) 32 39
Queuing Penalty (veh) 153 183
Storage Bay Dist (ft) 150
Storage Blk Time (%) 1
Queuing Penalty (veh) 0
Intersection: 2: NE Main Street (SC 417) & Curtis Street
Movement EB EB NB SB SB
Directions Served LT TR TR L T
Maximum Queue (ft) 38 47 235 103 102
Average Queue (ft) 24 29 80 44 28
95th Queue (ft) 33 37 171 81 79
Link Distance (ft) 10 10 1035 532
Upstream Blk Time (%) 83 82
Queuing Penalty (veh) 178 176
Storage Bay Dist (ft) 225
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 3: Hedge Street & College Street
Movement WB WB NB
Directions Served LT T L
Maximum Queue (ft) 1127 1122 197
Average Queue (ft) 800 797 121
95th Queue (ft) 1479 1468 249
Link Distance (ft) 1136 1136 203
Upstream Blk Time (%) 41 42 37
Queuing Penalty (veh) 0 0 15
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Build (2028) AM 10/16/2025
31 - BLD AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 2
Intersection: 4: Hedge Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 112 121 513 260
Average Queue (ft) 38 45 156 123
95th Queue (ft) 95 98 501 234
Link Distance (ft) 307 307 978 273
Upstream Blk Time (%) 3 1
Queuing Penalty (veh) 0 1
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Main Street & College Street
Movement WB WB NB SB
Directions Served LT TR LT TR
Maximum Queue (ft) 9 3 61 43
Average Queue (ft) 0 0 18 17
95th Queue (ft) 5 0 47 44
Link Distance (ft) 17 17 530 1219
Upstream Blk Time (%) 0 0
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Main Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 1185 1195 722 140
Average Queue (ft) 1009 998 388 55
95th Queue (ft) 1433 1434 733 189
Link Distance (ft) 1155 1155 976 530
Upstream Blk Time (%) 59 58 0
Queuing Penalty (veh) 0 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Build (2028) AM 10/16/2025
31 - BLD AM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 3
Intersection: 11: Hedge Street & Access A
Movement EB NB SB
Directions Served LR LT TR
Maximum Queue (ft) 160 188 26
Average Queue (ft) 44 71 1
95th Queue (ft) 148 238 23
Link Distance (ft) 1140 273 203
Upstream Blk Time (%) 13 0
Queuing Penalty (veh) 7 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 18: Access B & College Street
Movement WB WB NB
Directions Served LT T L
Maximum Queue (ft) 60 69 98
Average Queue (ft) 42 48 30
95th Queue (ft) 77 75 88
Link Distance (ft) 41 41 1004
Upstream Blk Time (%) 28 37
Queuing Penalty (veh) 131 172
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 1015
Queuing and Blocking Report
Build (2028) AM 10/16/2025
32 - BLD PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 1
Intersection: 1: NE Main Street (SC 417) & College Street
Movement WB WB NB NB SB
Directions Served LT TR L T TR
Maximum Queue (ft) 253 273 223 538 1235
Average Queue (ft) 245 171 121 239 886
95th Queue (ft) 252 358 272 618 1594
Link Distance (ft) 243 243 532 1213
Upstream Blk Time (%) 86 42 33 57
Queuing Penalty (veh) 274 135 167 0
Storage Bay Dist (ft) 150
Storage Blk Time (%) 44 9
Queuing Penalty (veh) 221 5
Intersection: 2: NE Main Street (SC 417) & Curtis Street
Movement EB EB NB SB SB
Directions Served LT TR TR L T
Maximum Queue (ft) 33 42 1050 237 161
Average Queue (ft) 21 25 439 50 16
95th Queue (ft) 32 43 1121 165 91
Link Distance (ft) 10 10 1035 532
Upstream Blk Time (%) 88 68 28 0
Queuing Penalty (veh) 251 194 0 0
Storage Bay Dist (ft) 225
Storage Blk Time (%) 0 0
Queuing Penalty (veh) 2 1
Intersection: 3: Hedge Street & College Street
Movement WB WB NB
Directions Served LT T L
Maximum Queue (ft) 1160 1159 198
Average Queue (ft) 812 797 102
95th Queue (ft) 1499 1507 226
Link Distance (ft) 1136 1136 203
Upstream Blk Time (%) 56 55 25
Queuing Penalty (veh) 0 0 14
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Build (2028) AM 10/16/2025
32 - BLD PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 2
Intersection: 4: Hedge Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 177 186 365 185
Average Queue (ft) 52 60 153 48
95th Queue (ft) 137 153 377 131
Link Distance (ft) 307 307 978 273
Upstream Blk Time (%) 2 0
Queuing Penalty (veh) 0 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 5: Main Street & College Street
Movement WB WB NB SB
Directions Served LT TR LT TR
Maximum Queue (ft) 36 3 60 613
Average Queue (ft) 16 0 23 231
95th Queue (ft) 37 3 50 620
Link Distance (ft) 17 17 530 1219
Upstream Blk Time (%) 68 0
Queuing Penalty (veh) 177 0
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 6: Main Street & Curtis Street
Movement EB EB NB SB
Directions Served LT TR TR LT
Maximum Queue (ft) 1186 1188 790 538
Average Queue (ft) 1107 1101 465 472
95th Queue (ft) 1345 1351 837 655
Link Distance (ft) 1155 1155 976 530
Upstream Blk Time (%) 80 78 71
Queuing Penalty (veh) 0 0 52
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Queuing and Blocking Report
Build (2028) AM 10/16/2025
32 - BLD PM Burdette North TIS SimTraffic Report
Impact Designs, Inc. Page 3
Intersection: 11: Hedge Street & Access A
Movement EB NB
Directions Served LR LT
Maximum Queue (ft) 91 179
Average Queue (ft) 26 36
95th Queue (ft) 75 159
Link Distance (ft) 1140 273
Upstream Blk Time (%) 4
Queuing Penalty (veh) 4
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Intersection: 18: Access B & College Street
Movement WB WB NB
Directions Served LT T L
Maximum Queue (ft) 60 66 506
Average Queue (ft) 47 33 214
95th Queue (ft) 59 76 516
Link Distance (ft) 42 42 1003
Upstream Blk Time (%) 85 42
Queuing Penalty (veh) 260 128
Storage Bay Dist (ft)
Storage Blk Time (%)
Queuing Penalty (veh)
Network Summary
Network wide Queuing Penalty: 1886
AP
PENDIX E
BACKGROUND IMPROVEMENTS
Simpsonville Planning Department
Planning &
Economic Development Director
Jon Derby
AGENDA ITEM
1 | Page
To:
Meeting Date:
Agenda Item:
Subject:
City Council
4/14/2026
O-2026-03, Code of Ordinance, Derelict Vehicle
Second Reading - Amendments to Chapter 18, Article
II, Division II, Section 18-61
Attachments: ☒Proposed Code of Ordinance ☐Proposed Zoning Ordinance
☐Discussion from Council ☐Locations Maps ☐ Petitions
☐Traffic Study ☒Supp. Sections of the Code
Brief Description of Request
From time-to-time staff discovers areas of the City Code of Ordinance that may need some
refinement. In this case, staff has requested changes to the sections listed below.
Section(s) Amendment Reason
18-61 To Amend the location permitting &
prohibiting derelict vehicles
Clarify language that better defines the
nuisance and the appropriate storage.
Council Committee of the Whole
Nothing has changed since 1st Reading on March 10th.
Staff Comments
The current language for §18-61 (Abandonment prohibited; junk motor vehicle defined), defines
what a
junk vehicle is and provides permitted location options to allow junk vehicles within a
property. These location options are also mentioned in the exception portion of Derelict Motor
Vehicle definition § 18-36 Definitions. However, Section 18-61 further explains that junk
vehicles can be stored in “areas” in addition to a 3-sided building or e nclosed building. This term,
“area” i
s not mentioned in the definition Section of 18-36 as an option nor is it defined. With junk
vehicles being synonymous with derelict vehicles, it can create confusion or inconsistency within
the
intent of the code.
Staff has requested this portion be removed and better clarify the allowable locations.
Ordinance O-2026-03
AN ORDINANCE TO AMEND DIVISION 2 (JUNK OR ABANDONED
VEHICLES) OF ARTICLE II (NUISANCES) OF CHAPTER 18
(ENVIRONMENT) OF THE CITY OF SIMPSONVILLE CODE OF
ORDINANCES
WHEREAS, the City of Simpsonville City Council reviews its Ordinances at various
times to make necessary improvements and/or changes; and,
WHEREAS, the City of Simpsonville desires to amend its existing ordinances regarding
the storage of derelict vehicles and junk to resolve conflicting language pertaining to the same.
NOW, THEREFORE, BE IT ORDAINED by the Mayor and Council of the City of
Simpsonville as follows:
Section 1. That Division 2 (Junk or Abandoned Vehicles) of Article II (Nuisances) of
Chapter 18 (Environment) be amended as follows: [Additions are underlined;
deletions are struck through.]
Sec. 18-61 – Abandonment prohibited; junk motor vehicle
(a) It shall be unlawful for any person to abandon, accumulate or place or deposit or cause
to be placed or deposited on any street, alleyway, or sidewalk, or anywhere within the
corporate limits of the city, other than within an enclosed building or area any of the
following: derelict motor vehicles (as defined herein) or junk, old automobiles ,
including old vehicles or parts of old automobiles, or vehicles, except those as may be
approved by the City Council. The foregoing prohibition shall not apply to derelict
motor vehicles or junk, including old vehicle or parts of old automobiles located within
a commercial garage, wrecker, or storage facility, which shall be stored in accordance
with the Simpsonville Zoning Ordinance.
(b) Any motor vehicle of which the condition of is wrecked, dismantled, partially
dismantled, inoperative, or discarded, and remains so for a period of 30 days, shall be
deemed abandoned junk motor vehicle.
Section 2. Severability. The provisions of this Ordinance are hereby declared to be
severable and if any section, phrase or provision shall for any reason be declared by a court of
competent jurisdiction to be invalid or unenforceable, such declaration shall not affect the
validity of the remainder of the sections, phrases and provisions hereunder.
Section 3. Suspension of Conflicting Ordinances, Rules, Orders or Resolutions. All
ordinances, rules, orders, resolutions and parts thereof in conflict herewith are, to the extent of
such conflict, hereby suspended for the duration of this ordinance.
Ordinance O-2026-03
Section 4. Savings Clause: Nothing in this ordinance hereby adopted shall be construed to
affect any suit or proceeding in any court, or any rights acquired, or liability incurred, or any
cause or causes of action acquired or existing, under any act or ordinance hereby repealed as
stated in Section 3 of the ordinance; nor shall any just or legal right or remedy of any character
be lost, impaired or affected by this ordinance.
Section 5. Effective Date of the Ordinance. This ordinance shall be effective immediately
upon passage.
DONE in meeting duly assembled this day of 2026.
SIGNATURE OF MAYOR:
______________________________
Paul Shewmaker
ATTEST:
__________________________________
Ashley Clark
City Clerk
First Reading: March 10, 2026
Second Reading: April, 14, 2026
APPROVED AS TO FORM:
_________________________________
Daniel Hughes
City Attorney
Simpsonville Planning Department
P lanning & Economic Development Director
Jon Derby
AG ENDA ITEM
1 | Page
To:
Meeting Date:
Agenda Item:
Subject:
Applicant/Owner:
Planning Commission
04/14/2026
Proposed rezoning to B-G
Z-2026-01 Proposed rezoning to property located at 206
Ladean Ct. Tax Map# 0330.00.01.001.24
Justin A. Holck, Scu letown Real Estate Holdings
Attachments: ☒Proposed Ordinance ☐Proposed Concept Plan
☐Proposed Statement of Intent ☒Applicant Material
☒C onsent Letter ☒Locations Maps ☐Petitions
☐T
raffic Study ☐Renderings
Brief
Description of request
The City of Simpsonville has received a signed petition requesting the rezoning of property
pursuant to Section 7.5 of the Simpsonville Zoning Ordinance. This petition is for the parcel
located at 206 Ladean Ct (tax map # 0330.00.01.001.24)
The applicant has requested that this parcel be rezoned back to B-G, (Business General)
from its current zoning of ID (Innovative Development). The applicant would like to market
the site under the B-G use and design standards.
Existing Zoning Requested Zoning Surrounding Zoning Future Land Use Size of Property
ID BG B-G Village Activity
Center
0.66 +/- Acres
Simpsonville Planning Department
Planning & Economic Development Director
Jon Derby
Z-2026-01
2 | Page
Location & Site Description
This parcel was rezoned to ID in 2022 for the “Scuffletown Food Truck Park” . This project
saw great success over the years. The site layout is still intact for the food park concept.
Ingress/egress to the site is still from the private drive via the Fairview Market shopping
center besides the Wine Barn (Prior Ace Hardware).
Comprehensive Plan
The City’s Comprehensive Plan identifies this area as Village Activity Center. This
designation is intended to promote a mix of uses, of which various commercial uses
remain predominant, but where residential, service, and other uses are complementary.
Where applied to older highway corridors characterized by commercial “strip” uses, the
intent is to encourage infill and redevelopment for a more diverse and attractive mix of uses
over time. Ensuring that buildings are of the appropriate scale and intensity is critical, as is
ensuring that sites are designed in a coordinated, as opposed to a lot-by-lot, manner. New
commercial “strip” development is discouraged.
Zoning District
Per Section 2.8.1 of the Simpsonville Zoning Ordinance: “The B-G, Business—General
District is established to promote accessible and central concentrations of business
activities and commercial establishments offering both retail goods and services to people
from throughout the community. This district also provides opportunities to integrate
residential uses subject to careful design. The district is intended to serve both pedestrians
as well as people who travel by automobile. Therefore, this district is primarily located
along major roadways, and businesses are encouraged to locate in close proximity to one
another. Where necessary, adjacent residential areas are protected through landscaping
and site design.”
Public Hearing Proceeding
A public hearing regarding this petition was conducted on March 3rd, 2026, before the body
of the Simpsonville Planning Commission. The were no public comments.
Planning Commission Review
The Simpsonville Planning Commission reviewed the request to rezone the propert y at
their March 3rd, 2026, meeting. By a vote of 6 -0, the Planning Commission recommends
approval of Z-2026-01.
Simpsonville Planning Department
Planning & Economic Development Director
Jon Derby
Z-2026-01
3 | Page
Site Improvements
No site improvements at this time. The site is still intact from the approved master site plan
for the food truck concept. Any new development would adhere to the site standards of
Article 4, of the Simpsonville Zoning Ordinance.
Staff Comments
Staff recommends approval.
STAFF RECOMMENDATION: I move that the Planning Commission recommend
approval of the requested rezoning set forth in Ordinance Z-2026-01.
ORDINANCE NO. Z-2026-01
WHEREAS, the South Carolina Code of Laws of 1976, as amended, Chapter 23 Title
5 provides for the process for municipalities to rezone property; and
WHEREAS, the City of Simpsonville has enacted a Zoning Ordinance which governs
amendments to the Official Zoning Map; and
WHEREAS, the hereinafter described propert y was advertised on February 16, 2026,
and the City of Simpsonville Planning Commission held a public hearing on March 3, 2026.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF
SIMPSONVILLE THAT:
1. ZONING CLASSIFICATION: The Official Zoning Map of the City of
Simpsonville is hereby amended to assign Tax Map # 0330.00-01-001.24 depicted in the deed
contained in Book 2682 on Page 72, of the official records of Greenville County Register of
Deeds and as depicted in Exhibit “A” & “B”, attached hereto, the zoning classification of B-G,
Business General District.
2. PROVISION SEVERAGE: It is hereby declared to be the intention of the
governing authority of this municipality that the sections , subjections, paragraphes, sentences,
clauses and phrases are severable, and if any phrase, clause, sentence, paragraph, subsection, or
section of this Ordinance shall be declared invalid or unconstitutional by the valid judgment or
decree of any court or competent jurisdiction, such invalidity or unconstitutionality shall not
effect any of the remaining portions of this Ordinance so held to be invalid.
3. ORDINANCE SUPERSEDES PREVIOUS INCONSISTENT
LEGISLATION: All Ordinances or parts of Ordinances inconsistent herewith, which may
have heretofore been passed by the Simpsonville City Council, are hereby repealed.
(SIGNATURE PAGE FOLLOWS)
AN ORDINANCE TO AMEND THE ZONING MAP
OF THE CITY OF SIMPSONVILLE, SOUTH
CAROLINA OF LAND AT 206 LADEAN COURT ,
TAX MAP# 0330.00- 01-001.24, OWNED BY
SCUFFLETOWN REAL ESTATE HOLDING
ORDINANCE NO.: Z-2026-01
Page 2
This Ordinance shall be effective upon second and final reading by the City Council.
SIGNATURE OF MAYOR:
_________________________________
Paul Shewmaker
ATTEST:
__________________________________
Ashley Clark
City Clerk
APPROVED AS TO FORM:
_________________________________
Daniel Hughes
City Attorney
First Reading: April 14, 2026
Second Reading: May 12, 2026
ORDINANCE NO.: Z-2026-01
Page 3
EXHIBIT “A”
ORDINANCE NO.: Z-2026-01
Page 4
EXHIBIT B
CITY OF SIMPSONVILLE
ZONING AMENDMENT (REZONING)
APPLICATION
118 Northeast Main Street Simpsonville, SC 29681
Ph. (864) 967-9526 Fax (864) 967-9530
SITE/PROPERTY LOCATION:
Property Address: __________________________ Tax Map Number: ______________________________
APPLICANT: _______________________________________________________________________
Mailing Address: ___________________________ City, State, Zip: ________________________________
Phone Number: ____________________________ E- mail Address: ________________________________
PROPERTY OWNER (if different from Applicant): _______________________________________________
Mailing Address: ___________________________ City, State, Zip: ________________________________
Phone Number: ____________________________ E- mail Address: ________________________________
Current Requested
Zoning District: ______________________ ______________________
“Future Land Use Map” Designation: ______________________ ______________________
Project Description (be specific): __________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
_____________________________________________________________________________________
No. of Parcels: _____________________ Acreage of Parcel(s): ________________________
Submittal Checklist*:
Consent Letter from Property Owner (if application is not signed by property owner)
Cover Letter explaining your request in detail
Application Fee (see “Rezoning Guide”)
Survey/Boundary Map – 1 printed copy/1 PDF copy
*Staff reserves the right to request additional information and/or materials as necessary
I do hereby certify as property owner/authorized agent that the information shown on this application and any
attached forms and/or plans is correct.
_____________________________________ _____________________________ ______________
Signature Printed Name Date
FOR CITY STAFF USE ONLY
Date Received: ________ By: _______________ Docket #: __________ Zoning District: ________
Comments: ________________________________ PC Review: __________ CC Review: ___________
__________________________________________ APPROVED ( with conditions) DENIED
206 Ladean Ct, Simpsonville SC
Justin A Holck
306 Lorca DR
Greenville, SC 29611
541-610-2872
justinaholck@gmail.com
ID
BG
Change from ID zoning to BG
ID
BG
1
0.74
Justin A Holck
02/11/2026
0330000100124
February 11, 2026
City of Simpsonville Planning Commission
118 NE Main Street
Simpsonville, SC 29681
Re: Rezoning Request – 206 Ladean Court, Simpsonville, SC
Dear Members of the Planning Commission,
Please accept this letter as a formal request to rezone the property located at 206 Ladean
Court, Simpsonville, South Carolina from its current Innovative Development (ID)
designation back to Business General (BG).
The purpose of this request is to restore the property’s zoning classification to Business
General in order to better align with surrounding commercial uses and to support
appropriate business operations at this location. The Business General designation is
consistent with the existing development pattern in the area and provides suitable
flexibility for commercial activity while remaining compliant with all applicable municipal
standards and regulations.
This proposed rezoning will not negatively impact the character of the surrounding area.
Rather, it reinforces the established commercial nature of nearby properties and supports
continued economic activity within the corridor.
We respectfully request review and approval of this rezoning application. Please advise if
any additional documentation or supporting materials are required to assist in your
evaluation.
Thank you for your time and consideration.
Sincerely,
Justin Holck
Owner
541-610-2872
justinaholck@gmail.com
G r e e n v ille C o u n t y , S C
G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille , S o u t h C a r o lin a , G r e e n v ille
C o u n t y G I S D iv is io n
F e b r u a r y 2 4 , 2 0 2 6
0 1 5 0 3 0 07 5 f t
0 4 0 8 02 0 m
1 : 1 , 6 0 0
D is c la im e r : T h is M a p is n o t a L A N D S U R V E Y a n d is f o r r e f e r e n c e p u r p o s e s o n ly . D a t a c o n t a in e d in t h is m a p a r e p r e p a r e d f o r t h e in v e n t o r y o f R e a l P r o p e r t y f o u n d w it h in t h is ju r is d ic t io n , a n d a r e
G r e e n v ille C o u n t y , S C
G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille , S o u t h C a r o lin a , G r e e n v ille
C o u n t y G I S D iv is io n
F e b r u a r y 2 4 , 2 0 2 6
0 1 5 0 3 0 07 5 f t
0 4 0 8 02 0 m
1 : 1 , 6 0 0
D is c la im e r : T h is M a p is n o t a L A N D S U R V E Y a n d is f o r r e f e r e n c e p u r p o s e s o n ly . D a t a c o n t a in e d in t h is m a p a r e p r e p a r e d f o r t h e in v e n t o r y o f R e a l P r o p e r t y f o u n d w it h in t h is ju r is d ic t io n , a n d a r e
STATE OF SOUTH CAROLINA COUNTY OF GREENVILLE CITY OF SIMPSONVILLE City of Simpsonville RESOLUTION R-2026-08 ALLOCATION OF GREENVILLE COUNTY CDBG AND HOME FUNDS FOR PROGRAM YEAR 2026 WHEREAS, the City of Simpsonville participates in the Greenville County Urban County Program; and WHEREAS, the funds received by Greenville County available for allocation by the City of Simpsonville are as follows: CDBG HOME City Allocation $145,125 $49,375 Program Income $ 9,400 $0 _________________________________________________________________ Total Estimated $154,525 $49,375 WHEREAS, the HOME funds may only be used to increase the supply of decent affordable housing for modest income persons, and CDBG funds may only be used to assist low- and moderate-income persons, reduce or eliminate slum and community blight, or meet an urgent community need where no other funding is available; and WHEREAS, the Mayor and Council of the City of Simpsonville have discussed and reviewed projects for which these funds should be allocated by Greenville County; NOW, THEREFORE, IT IS HEREBY RESOLVED that the City of Simpsonville accepts the allocation of funds as set forth above and budgets use of the funds as follows: HOME funds in the amount of $49,375 or such other amount as may be received in HOME funds in the 2026 program year to be used for new construction or reconstruction of affordable housing and assisting low- and moderate-income households in the City of Simpsonville; CDBG funds in the amount of $154,525 or such other amount as may be received in CDBG funds in the 2026 program year may be used on the following activities: $22,000 in CDBG to be allocated to Public Service programs; $49,375 for New Construction; $128,525 for Infrastructure, and $4,000 in disposition in the City of Simpsonville.
ANY CHANGE in CDBG and HOME funding allocations by the Greenville County Redevelopment Authority and the U.S. Department of Housing and Urban Development, increase or decrease in funding, will be distributed on a pro rata basis to all activities. PASSED, ADOPTED AND APPROVED by the Council of the City of Simpsonville on this th day of , 2026. CITY OF SIMPSONVILLE, SOUTH CAROLINA BY: ATTEST: Paul Shewmaker, Mayor Ashley Clark, City Clerk REVIEWED: Tee Coker, City Administrator APPROVED AS TO FORM: Daniel Hughes, City Attorney
For additional information please contact
Greenville County Redevelopment Authority • 301 University Ridge, Suite South-4300 • Greenville SC 29601
Phone: (864) 242-9801 • Fax: (864) 232-9946
CITY OF SIMPSONVILLE
2026 COMMUNITY DEVELOMENT BLOCK GRANT (CDBG)
AND HOME PROGRAM FACT SHEET
Community Development Block Grant (CDBG). This grant is used to help low- and moderate-
income people, prevent or eliminate blight, or meet an urgent community need where no other
funding is available.
Qualified projects include:
1. Projects benefiting an entire neighborhood (public works, infrastructure, sewer, streets,
sidewalks, parks, and lighting). At least 51 percent of the people in the neighborhood must be
verified low to moderate income.
2. Projects dealing with housing (rehabilitation or new construction). Each household must be
verified as income eligible.
3. Public service activities (education, nutrition, childcare, and medical care). Participants must
be income qualified unless they are members of certain groups (seniors, disabled adults,
battered and abused spouses and children, illiterates, people with HIV/AIDS, or migrant farm
workers). People in these groups are automatically eligible for public service activities.
4. Public facilities. If a community center is for everyone in a neighborhood, the neighborhood
must be low or moderate income. If it is for one of the special groups mentioned above, it
may be located anywhere inside the city.
5. Projects to eliminate slums and blight on a spot basis – demolition activities. The site and/or
the building must be declared blighted by your city codes department.
6. Economic Development: Revolving loans to existing or start up small business owners and
façade improvement to commercial properties in the Central Business Areas for the purpose
of creating and retaining low- and moderate-income jobs.
HOME Program. This program is used to increase the supply and provide access to decent and
safe affordable housing for low- and moderate-income persons/households. Each participating
household must be income qualified.
Funding Available. The City of Simpsonville has the following estimated allocation
for
Program Year 2026: $203,900
Simpsonville CDBG HOME
Grant Estimated Allocation $145,125 $49,375
Program Income $ 9,400 $0
Total $154,525 $49,375
Program income is generated by the repayment of CDBG or HOME funded housing loans and
has the same use requirements as the original grants.
PROGRAM YEAR 2026 BEGINS JULY 1, 2026
EXHIBIT A
RESOLUTION R-2026-09 A RESOLUTION TO AUTHORIZE THE CITY ADMINISTRATOR TO ENGAGE A PROFESSIONAL FIRM TO COMPLETE AN IMPACT FEE STUDY AND CAPITAL IMPROVEMENT PLAN AND DIRECTING THE PLANNING COMMISSION TO INITIATE AND REVIEW THOSE STUDIES TO MAKE A RECOMMENDATION FOR AN IMPACT FEE ORDINANCE AND ASSOCIATED CAPITAL IMPROVEMENT PLAN WHEREAS, South Carolina law authorizes municipalities to take actions not inconsistent with the Constitution and general laws of the State, regarding any subject the municipality finds necessary and proper for the health, safety, general welfare, and convenience of the municipality; and, WHEREAS, the City of Simpsonville has experienced increased growth in population and development with increasing demands on City public facilities and the services necessary to provide for the health, safety, security, general welfare, and convenience of the City’s residents and visitors; and, WHEREAS, these services including, for example, parks and recreation services, police and fire, and other public safety services, are necessary to provide for and promote harmonious living conditions and to maintain quality standards of living for the City’s residents and to encourage tourism; and, WHEREAS, pursuant to S.C. Code §6-1-910 (the South Carolina Development Fee Act (“the Act”), the Simpsonville City Council is required to enact a Resolution directing the Planning Commission to review studies and to recommend an impact fee ordinance developed in accordance with the Act; and, WHEREAS, the City must have a capital improvements plan prepared as well as an impact fee study to justify any impact fees that are enacted; and, WHEREAS, City Council is authorizing the City Administrator to contract with a qualified firm to prepare the Impact Fee Study and Capital Improvement Plan; and, WHEREAS, this study will require a funding allocation of in order to complete; and, WHEREAS, the City Council believes that an Impact Fee Ordinance would be in the best interest of the City of Simpsonville. NOW, THEREFORE BE IT RESOLVED by the Mayor and Council of the City of Simpsonville, in a duly assembled Council meeting, as follows: 1. Initiation of Study. The City of Simpsonville Planning Commission is hereby directed to initiate and complete studies to develop a proposed Impact Fee Ordinance and Capital Improvement Plan consistent with the Act. 2. Authorization for Services. That the City Administrator is authorized to engage the services of a professional firm specializing in development of an Impact Fee Study and Capital Improvement Plan, and to fund the cost of the Study and Plan from the General Fund Balance in an amount not to exceed $51,500.00.
RESOLVED AND ADOPTED this __________ day of April 2026. CITY OF SIMPSONVILLE, SOUTH CAROLINA BY: ________________________________ Paul Shewmaker, Mayor ATTEST: ___________________________________ Ashley Clark, Municipal Clerk APPROVED AS TO FORM: ___________________________________ Daniel Hughes
RESOLUTION R-2026-10
A RESOLUTION APPROVING AN UPDATED FEE SCHEDULE FOR FREEDOM OF
INFORMATION ACT REQUESTS FOR INCLUSION IN FISCAL YEAR 2026-2027
BUDGET TO GO INTO EFFECT IMMEDIATELY
WHEREAS, the City of Simpsonville processes public records requests pursuant to the South
Carolina Freedom of Information Act, S.C. Code § Title 30, Chapter 4; and
WHEREAS, S.C. Code § 30-4-30(B) authorizes a public body to establish and collect reasonable
fees for the search, retrieval, redaction, and copying of public records; and
WHEREAS, the City currently utilizes a fee schedule to calculate such costs, but a formal record
of City Council approval has not been identified; and
WHEREAS, City Administration and the Simpsonville Police Department have reviewed and
updated the fee schedule to improve clarity, consistency, and efficiency in processing requests
across departments; and
WHEREAS, the proposed updates include, among other items, establishing a flat rate for reports,
clarifying provisions for victims of crimes, adjusting thresholds for staff time charges, and
streamlining payment practices; and
WHEREAS, City Council finds that adopting an updated fee schedule is necessary to ensure
transparency, consistency, and compliance with state law while maintaining reasonable access to
public records.
NOW, THEREFORE, BE IT RESOLVED THAT:
1. Approval of Fee Schedule. The updated Fee Schedule for Requests Under t
he
Freedom of Information Act (Fee Schedule), attached hereto as Exhibit A, is hereby approved.
2. Incorporation into Budget. The approved Fee Schedule shall be incorporated into the
Fiscal Year 2026–2027 Budget and shall serve as the City of Simpsonville’s official fee schedule
for processing Freedom of Information Act requests.
3. Immediate Effect. Resolution R-2026-10 and the approved Fee Schedule shall take
effect immediately upon adoption.
4. Future Application. The approved Fee Schedule shall remain in effect for future
fiscal years unless amended or repealed by subsequent action of Simpsonville City Council.
ADOPTED this ____ day of April, 2026. CITY OF SIMPSONVILLE, SOUTH CAROLINA BY: __________________________________ Paul Shewmaker, Mayor ATTEST: __________________________________ Ashley Clark, City Clerk APPROVED AS TO FORM: __________________________________ Daniel Hughes, City Attorney
— CITY OF SIMPSONVILLE —
Fee Schedule for Requests Under Freedom of Information Act
Search/Retrieval Time Search/Retrieval Time Rate Cost
The fee for the search, retrieval,
and redaction of records
shall not exceed the prorated
hourly salary of the lowest paid
employee who, in the reasonable
discretion of the custodian of the
records, has the necessary skill
and training to perform the tasks.
____hours $____/hour $____
Copies Number of Units Rate Cost
A charge for printing or copies will
start at 50 pages at $.10/page. ____copies $0.10/page $____
Media Number of Units Rate Cost
Hard Drive at market rate
USB Drive at market rate ____HD | ____USBD $___HD
$___USB $____
Reports Number of Reports Rate Cost
All Police Department records
requests including but not limited
to:
• Incident Reports1
• Accident Reports2
• Local Criminal History
Check
• Calls for Service
____Reports Flat rate: $8
per request3 $____
TOTAL COST $____
DEPOSIT4 (Estimated Total Cost $_____ x 0.25) $____
A public body is permitted by S.C. Code Ann. § 30-4-30(B) of South Carolina Freedom Information Act, S.C. Code Ann.
Title 30, Chapter 4 to require a fee for processing public records requests. Simpsonville City Council approved with
Resolution R-2026-10 on April 14, 2026 the current FOIA fee schedule for the City of Simpsonville to be included in the
Fiscal Year 2026-2027 budget and future budgets and to go into effect immediately upon approval.
1 Victims of a crime and their legal guardians and ot her law enforcement agencies and certai n organizations (e.g. sheriff’s offices, police departments, Federal Bureau of Investigation) can receive an incident report at no charge.
2 The State Collision Report does not designate a “victim” or assign “fault ” but rather qualifies as a statistical document that only categorizes by “contributor.” An $8 fee will be applied to all requested collision reports. Only victims of crimes can receive free
reports.
3 A charge
for staff time may be made in addition to the report/s fee if the amount of time required to process the request for a
r
eport or reports is at least 1 hour.
4 A 25% deposit may be required prior to processing a request if the estimated total cost is at least $20.
EXHIBIT A:
PROPOSED FEE SCHEDULE
Fee Schedule for FOIA Requests
Search/Retrieval Time Minutes/Hour x Rate = Cost
The fee for the search, retrieval,
redaction or scanning of records
will equal the hourly wage of the
lowest paid employee who can
fulfill the request.
Copies Number of
Copies
x Rate = Cost
If an electronic version of a record
is available, and the requestor
elects to receive the record
electronically, then there will be no
charge for copies.*
$0.10/page
Media Type Number of
Units
= Cost
CD | DVD | Flash Drive | Other
Type x Rate = Cost
Postage/Shipping USPS
UPS
FedEx
Reports Number of
Reports
x Rate +
Printing
($0.10/page)
= Cost
Incident Reports**
(Simpsonville Police Department) $5**
*/report
Accident Reports
(Simpsonville Police Department) $5/report
Local Criminal History Check
(Simpsonville Police Department) $6/report
TOTAL COST
*Please note that if the requested records are not in an electronic form, and our office agrees to transfer
the documents to an electronic format, then there may be a charge for the staff time required to
transfer the documents to an electronic format.
**Victims of a crime can receive an incident report at no charge but must pick up the report at
the Simpsonville Police Department at 405 E. Curtis St., Simpsonville, S.C. 29681.
***The Simpson ville Police Department may charge different fee amounts, such as printing expenses,
for fulfilling FOIA requests, depending on staff hourly wage and other factors.
EXHIBIT B:
CURRENT FEE SCHEDULE
Source: City of Simpsonville website. First collected Oct 17, 2026.