RecordWell Data

Council Packet_2025-11-25

City of Simpsonville · Greenville County · meeting of Nov 21, 2025 · Agenda packets

Open the original document More from City of Simpsonville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF SIMPSONVILLE: CITY COUNCIL COMMITTEE OF THE WHOLE AGENDA Council Chambers, Simpsonville City Hall | Nov. 25, 2025| 6 p.m. 1. CALL TO ORDER Presiding Officer: Mayor Paul Shewmaker 2. ROLL CALL Recorder: Ashley Clark, Clerk of Council 3. PLEDGE OF ALLEGIANCE 4. APPROVAL OF MINUTES: October 28, 2025 5. CITIZEN COMMENTS (Code of Ordinances: Chapter 2. Article II. Division 2. Sec. 2-69.b.1) Citizens of the City or others who have standing in the City, such as business owners, shall be entitled to appear before council at regular meetings. Such persons may speak regarding matters that are within the jurisdiction of the City, except for personnel matters. At least 10 minutes prior to the time the meeting is scheduled to commence, such person wishing to appear before council must place his or her name, address, and topic to be addressed on the public comments sign-up list maintained by the City Clerk. Individual comments shall be limited to three minutes. 6. CITY ADMINISTRATOR’S REPORT Tee Coker, City Administrator 7. BUSINESS A. Z-2025-02, Proposed Rezoning of Properties Located at 118 & 124 NE Main Street Jon Derby, Planning Director B. Resolution R-2025-05, Textile Rehabilitation Certification, Burdette Textile Factory Jon Derby, Planning Director C. Proposed Resolution to Authorize Conveyance of Garrett Property to the City of Simpsonville Tee Coker, City Administrator D. Proposed Ordinance to Approve a Trespass Enforcement Authorization Program Tee Coker, City Administrator E. Nominations & Selections of Council Representatives to CCNB Amphitheatre Selection Committee F. Nomination & Selection of Council Representative to the Simpsonville Chamber of Commerce Board 8. ADJOURNMENT PLEASE NOTE CITY COUNCIL MEETING AGENDAS ARE ACCURATE AS OF THE FRIDAY PRIOR TO THE MEETING BUT IS SUBJECT TO CHANGE UP TO TWENTY- FOUR (24) HOURS PRIOR TO THE MEETING. PLEASE CONTACT SIMPSONVILLE CITY HALL THE DAY OF THE MEETING FOR AN UP-TO-DATE AGENDA AT 864-967-9526. City of Simpsonville: City Council Committee of the Whole MINUTES Council Chambers, Simpsonville City Hall | Date: Oct. 28, 2025 | 6 p.m. 1. CALL TO ORDER Presiding Officer: Paul Shewmaker, Mayor 2. ROLL CALL Councilmember Present Absent Ward 1 – Chad O’Rear ü Ward 2 – Aaron Rupe ü Ward 3 – Shannon Williams ü Ward 4 – Sherry Roche ü Ward 5 – Tim Pinkerton ü Ward 6 – Lou Hutchings ü Mayor Paul Shewmaker ü 3. PLEDGE OF ALLEGIANCE 4. APPROVAL OF MINUTES Minutes from the September 23, 2025 Committee of the Whole were approved as written. 5. CITIZEN COMMENTS Brianne Shaffer expressed concerns about the increasing population of feral cats in the community. Ms. Shaffer expressed her willingness to work together with city officials t o develop and implement strategies aimed at addressing these concerns. Joyce Todd voiced concerns regarding the loud music emanating from the amphitheater which has been affecting the quality of life for residents in the area. 6. STAFF REPORTS PRESENTED Community Relations- Justin Campbell, Community Relations Specialist, presented on events happening in the city. Planning Report- Jon Derby, Planning Director, presented information on upcoming annexations and ordinances. Finance Dept.- Maria Tooley, Finance Director, presented a monthly financial report. Administrative Dept.- Tee Coker, City Administrator, presented a City Administrator report. 7. BUSINESS ITEMS A. O-2025-11, Amend Code of Ordinances Sec. 8-41 and 8-42, Technical Codes Motion by Councilmember Roche with a second by Councilmember Hutchings to approve O-2025-11, Amend Code of Ordinances Sec. 8-41 and 8-42, Technical Codes and move to the next Business Meeting. Y-7 N-0. Motion carried. B. AXZ-2025-03, Proposed Annexation of Property at 320 Tearose Lane Motion by Councilmember Roche with a second by Councilmember Hutchings to approve AXZ-2025-03, Proposed Annexation of Property at 320 Tearose Lane. Y-7 N-0. Motion carried. C. AXZ-2025-04, Proposed Annexation of Property on W. Georgia Road Motion by Councilmember Roche with a second by Councilmember Williams to approve AXZ-2025-04, Proposed Annexation of Property on W. Georgia Road. Y-7 N-0. Motion carried. D. Amend Code of Ordinances Sec. 16-4, Wards and Boundaries Motion by Councilmember Pinkerton with a second by Councilmember Roche to approve Amending Code of Ordinances Sec. 16-4, Wards and Boundaries. Y-7 N-0. Motion carried. 8. EXECUTIVE SESSION Motion by Councilmember Roche with a second by Councilmember Rupe to go into executive session to discuss a contractual arrangement pertaining to Heritage Park . Y-7 N-0. Motion carried. Upon coming out of executive session the following vote was taken. Motion by Councilmember Pinkerton with a second by Councilmember Rupe to terminate management of the CCNB Amphitheater. Y-7 N-0. Motion carried. 9. ADJOURNMENT Time of Adjournment: 8:42PM Simpsonville Planning Department P lanning & Economic Development Director Jon Derby A GENDA ITEM 1 | Page To: City Council - Committee of the Whole Meeting Date: 11/25/2025 Agenda Item: Proposed rezoning to ID Subject: Z-2025-02 Proposed rezoning to property located at 118 & 124 NE Main St. Tax Map# 0315.00.02.004.00 & 0315.00.02.001.00 A pplicant/Owner: Blue Ridge Land Holdings, LLC Attachments: ☒Proposed Ordinance ☒Proposed Concept Plan ☒Proposed Statement of Intent ☒Applicant Material ☐ Consent Letter ☒Locations Maps ☒Development Agreement ☒Traffic Study ☒Renderings Bri ef Description of request The City of Simpsonville has received a signed petition requesting the rezoning of parcels of land pursuant to Section 7.5 of the Simpsonville Zoning Ordinance. This petition is for two parcels located at 118 & 124 NE Main St (tax map # 0315.00.02.004.00 & 315.00.02.001.00) The applicant has requested that these two parcels be rezoned from B-U, Business Urban to ID (Innovative Development). The developer is looking to create a mixed-use development of multifamily and commercial retail within our city center. Existing Zoning Requested Zoning Surrounding Zoning Extraterritorial Land Use Size of Property B-U, Business Urban ID B-U & B-G Town Center Mixed-Use 2.44 +/- Acres Simpsonville Planning Department P lanning & Economic Development Director Jon Derby Z-2025-02 2 | Page Location & Site Description These parcels contain the prior City Hall site and the vacant AAA/Suntrust building, with surface parking on the rear portions. These parcels will be combined as one tax parcel in the future, fronting NE Main St., E. College St., & Hedge St. Statement of Intent The Statement of Intent details a three-story, multifamily, mixed-use project, with surfacing parking on the eastern side near Hedge St. The development will consist of a maximum 80 residential units comprised of studio, one, two, & three-bedroom units. 18,000 square feet of commercial space will be provided on the main level, fronting NE Main St. & E. College St. Access points will be installed on E. College St. and on Hedge St. 144 surface parking spaces are being provided, hidden from Main St, behind the structure. Coworking spaces and flexible office units will be integrated into the project. The development will incorporate public art and streetscape elements to coincide with the city’s downtown streetscape project. The development is proposing the use of EV (Electric Vehicle) charging stations as well as solar power concepts to promote renewable energy options. Comprehensive Plan The City’s Comprehensive Plan identifies this area as Town Center Mixed Use. This designation applies only in and around Downtown Simpsonville. It emphasizes the urban character and the mix and intensity of activities uniquely suited to the town center. This designation is intended to permit a true mix of all uses, except industrial, at the highest levels of scale and density within the City and with unique development standards tailored to the urban character of Downtown. It is particularly important to move the Downtown towards becoming a center of activity not only in the day, but also at night and during weekends, by promoting a mix of commercial, entertainment, residential, and other uses. To help achieve this goal, creative forms of housing, such as lofts and residential units in second-stories above ground level retail, should be encouraged.… Zoning District Per Section 2.11.1 of the Simpsonville Zoning Ordinance: “the ID, Innovative Development District is established to provide flexibility in the planning and construction of development projects in accordance with an approved plan. In return for greater flexibility in site design requirements, innovative development are expected to demonstrate exceptional quality community designs that: Simpsonville Planning Department P lanning & Economic Development Director Jon Derby Z-2025-02 3 | Page A. Preserve critical environmental resources; B. Provide above-average open space amenities; C. Demonstrate innovative and creative site planning techniques that improve upon the layout and design of buildings, open space and circulation that would otherwise be achieved by the standards of other allowable zoning districts; D. Assure compatibility with surrounding land uses and neighborhood character; and E. Provide greater efficiency in the layout and provision of roads, utilities, and other infrastructure. ” S ite Improvements The current overhead transmission lines, running in front of the old AAA/Suntrust building will be placed underground to allow for maximum use of the site. This will allow for this project to have a 0’ build line, along Main St and E. College St. Current vehicle access points along Main St will be removed, allowing for more fluid traffic movement for this stretch of Main St., while encouraging more walkability along the streetscape. Public Hearing Proceeding A public hearing regarding this petition was conducted on November 6th, 2025, before the body of the Simpsonville Planning Commission. There was only one public comment, in favor of the request with recommendation of color and pattern design. Planning Commission Review The Simpsonville Planning Commission reviewed the request to rezone the property at their November 6th, 2025, meeting. The Commission discussed the ingress/egress along with the proposed unit counts. The topic of parking was discussed, and their Traffic Engineer was available to answer other questions. By a vote of 4-0, the Planning Commission recommends approval of Z-2025-02. Staff Comments A traffic study has been conducted by the developers to determine potential impact from the proposed project. This project will be the first ground-up construction in the commercial core of the city in several years. The proposed design of the project will incorporate the materials and colors accustomed to our city theme, while introducing fresh, innovative design elements that breathe new life into the area. Simpsonville Planning Department P lanning & Economic Development Director Jon Derby Z-2025-02 4 | Page S TAFF RECOMMENDATION : Approval of the requested rezoning set forth in Ordinance Z-2025-02. ORDINANCE NO. Z-2025-02 WHEREAS, the South Carolina Code of Laws of 1976, as amended, Chapter 23 Title 5 provides for the process for municipalities to rezone property; and W HEREAS, the City of Simpsonville has enacted a Zoning Ordinance which governs amendments to the Official Zoning Map; and W HEREAS, the hereinafter described propert y was advertised on October 19, 2025 , and the City of Simpsonville Planning Commission held a public hearing on November 6, 2025. N OW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF SIMPSONVILLE THAT: 1. ZONING CLASSIFICATION: The Official Zoning Map of the City of Simpsonville is hereby amended to assign Tax Map # 0315.00-02-004.00 depicted in the deed contained in Book 2759 on Page 834, & Tax Map# 0315.00-02-001.00 depicted in the deed contained in Book 2623 on Page 2891, of the official records of Greenville County Register of Deeds and as depicted in Exhibit “A” & “B”, attached hereto, the zoning classification of I-D, Innovative Development District. 2. PROVISION SEVERAGE: It is hereby declared to be the intention of the governing authority of this municipality that the sections , subjections, paragraphes, sentences, clauses and phrases are severable, and if any phrase, clause, sentence, paragraph, subsection, or section of this Ordinance shall be declared invalid or unconstitutional by the valid judgment or decree of any court or competent jurisdiction, such invalidity or unconstitutionality shall not effect any of the remaining portions of this Ordinance so held to be invalid. 3. ORDINANCE SUPERSEDES PREVIOUS INCONSISTENT LEGISLATION: All Ordinances or parts of Ordinances inconsistent herewith, which may have heretofore been passed by the Simpsonville City Council, are hereby repealed. ( SIGNATURE PAGE FOLLOWS) AN ORDINANCE TO AMEND THE ZONING MAP OF THE CITY OF SIMPSONVILLE, SOUTH CAROLINA OF LAND AT 118 NE MAIN STREET , & 124 N E MAIN STREET., TAX MAP# 0315.00-02- 004.00, & 0315.00-02-001.00 OWNED BY BLUE RIDGE LAND HOLDINGS, LLC ORDINANCE NO.: Z-2025-02 Page 2 This Ordinance shall be effective upon second and final reading by the City Council. SIGNATURE OF MAYOR: _____________________ ____________ Paul Shewmaker ATTEST: __________________________________ Ashley Clark City Clerk APPROVED AS TO FORM: _________________________________ Daniel Hughes City Attorney First Reading: December 9, 2025 Second Reading: January 13, 2025 ORDINANCE NO.: Z-2025-02 Page 3 EXHIBIT “A” ORDINANCE NO.: Z-2025-02 Page 4 EXHIBIT B ±99,000-SF Mixed-Use DevelopmentLocated Along North East Main StreetCity of SimpsonvilleGreenville County, South Carolina N Project No.: 25195-0023October 9, 2025Prepared by Alliance Consulting Engineers, Inc. Documents prepared or furnished by Alliance Consulting Engineers, Inc. are instruments of service, and Alliance Consulting Engineers, Inc. retainsan ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the project is completed.NOTE: BOUNDARIES, TOPOGRAPHY, WETLANDS, AND STREAMS LOCATIONS ARE APPROXIMATE BASED OFF GEOGRAPHICINFORMATION SYSTEMS (GIS). A BOUNDARY AND TOPOGRAPHIC SURVEY ALONG WITH A WETLAND DELINEATION SHOULD BEPERFORMED TO DETERMINE ACCURATE BOUNDARY, TOPOGRAPHIC, AND WETLAND LOCATIONS. 7 11 4 9 1210 2426 10 SITE INFORMATION:TM#: 0315000200100, 0315000200400SIZE: ±2.52 ACRESEXISTING ZONING: B-U (BUSINESS - URBAN)PROPOSED ZONING: ID (INNOVATIVE DEVELOPMENT)SETBACKS: -FRONT = NONE-SIDE = NONE-REAR = NONEPARKING REQUIREMENTS:STALL WIDTH90-DEGREE STALL= 9-FT X 18FT24-FT AISLEPROVIDED PARKING COUNT: 144 SPACESPASSENGER: 139 SPACESADA: 5 SPACESPROPOSED BUILDING:MIXED USE DEVELOPMENT3 STORIES EAST COLLEGE STREET HEDGE STREET NORTH EAST MAIN STREET ±99,000-SFMIXED USEDEVELOPMENT PROPOSED BUILDING INFORMATION:RESIDENTIALAMENITYRETAILCOMMERCIALTOTAL LEVEL 113,9946,1478,9913,82332,955 LEVEL 232,95532,955 LEVEL 332,95532,955 TOTAL79,9046,1478,9913,82398,865 RESIDENTIAL UNIT COUNT: 73 Blue Ridge Land Holdings, LLC NORTH MAIN STREET10 12 13 © 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc. Burdette North Statement of Intent for Innovative Development (ID) Rezoning Project Name: Burdette North Location: Southeast corner of NE Main Street and E. College Street, Simpsonville, SC Parcels: Tax Map #0315000200400 (+/- 1.09-Acres) and #0315000200400 (+/- 1.43-Acres) Current Zoning: Business-Urban Proposed Zoning: Innovative Development (ID) Developer: Blue Ridge Land Holdings, LLC Architect: SHLTR Architects Civil/Site Design: Alliance Consulting Engineers, Inc. Traffic Impact Analysis: Impact Designs, Inc. Surveying: Site Design, Inc. Project Overview Burdette North is proposed as a vibrant, mixed-use redevelopment designed to bring new life and economic energy to the north end of Downtown Simpsonville. The project will include up to 80 residential units (a mix of studios, one-bedroom, and two-bedroom apartments) and +/- 18,000 square feet of commercial space dedicated to retail, restaurant, amenities, and coworking uses. The building will be a total of three (3) stories. As shown on the included Conceptual Site Plan, the development will include 144 surface parking spaces. Both existing structures on the site will be demolished to make way for this new, cohesive urban development that aligns with the City’s vision for a more walkable, connected, and active downtown district. Innovative Features Burdette North exemplifies the goals of the Innovative Development (ID) zoning by introducing design and sustainability features that are new to the City of Simpsonville’s Central Business District and Business Urban (B-U) zones. The project will include at least two (2) of the following innovative components:  Coworking Space: Dedicated coworking suites and flexible office amenities will serve local entrepreneurs, small businesses, and remote professionals, providing modern workspace solutions within a walkable downtown setting. Burdette North Statement of Intent Blue Ridge Land Holdings, LLC October 17, 2025 – Page 2 of 4 © 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc.All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc.  Public Art: The project will feature integrated public art installations—such as murals, sculptures, or artist-designed streetscape elements—that contribute to placemaking and enhance the visual identity of NE Main and College Streets.  Pervious Pavement: Portions of the parking and pedestrian areas will utilize pervious pavement systems to reduce stormwater runoff, promote infiltration, and improve site sustainability.  EV Charging Stations: Electric Vehicle (EV) charging infrastructure will be provided to support the growing demand for sustainable transportation options.  Solar Power: Where feasible, solar panels will be integrated to supplement building energy use and demonstrate commitment to renewable energy innovation. These innovative elements will provide a unique character and forward-thinking design approach, establishing Burdette North as a model for sustainable, mixed-use redevelopment in the city. Community Impact and Vision Burdette North will bring a new level of vibrancy and activity to NE Main Street and College Street, reinforcing the urban fabric of Downtown Simpsonville. The project’s blend of residential and commercial uses will:  Activate the public-facing street level with restaurants, retail, and coworking spaces  Provide diverse housing options that appeal to young professionals, empty nesters, retirees and small households  Encourage walkability and connectivity with nearby businesses and public amenities  Support the continued revitalization of the downtown corridor through attractive design and public engagement features As the second major downtown investment by Blue Ridge Land Holdings, LLC, following the successful redevelopment of Burdette Central, this project continues the developer’s commitment to high-quality, community-oriented growth in the City of Simpsonville. Working with SHLTR Architects and Alliance Consulting Engineers, Inc., the design team will deliver a well-integrated, visually appealing, and environmentally conscious project that enhances both the aesthetic and economic vitality of the city. Integrating residential uses into the City of Simpsonville’s downtown core brings vitality, economic stability, and a stronger sense of community to the urban environment. Residents living downtown provide support to local businesses, restaurants, and cultural venues, helping sustain activity beyond typical business hours and creating a lively, 24-hour district. Burdette North Statement of Intent Blue Ridge Land Holdings, LLC October 17, 2025 – Page 3 of 4 © 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc. This mix of living, working, and leisure spaces reduces reliance on cars, encourages walking, and fosters a more sustainable urban form. Moreover, downtown living attracts a diverse range of people - young professionals, small families, and retirees alike—who contribute to the social and cultural vibrancy of the area. By combining residential and commercial space, this project will be dynamic, safe, and engaging to the City of Simpsonville’s downtown, and serve as the center of urban life. Property Access & Traffic Flow Coordination Vehicle access to Burdette North will be on E. College and Hedge Streets (one ingress/egress on each street). The project team has designed internal circulation to align with the City’s soon-to-be implemented counterclockwise one-way circulation pattern. The Traffic Impact Analysis has accounted for the City’s new traffic pattern. The plan is to have Burdette North’s construction occurring simultaneously with Simpsonville’s Downtown Revitalization and Traffic Realignment strategy and construction. Existing curb cuts along NE Main Street and East College Street will be eliminated, along with one curb cut on Hedge Street. Eliminating multiple vehicle access points with this development offers several important benefits for safety, efficiency, and overall site design. By consolidating access to two (2) well-designed entrances/exits along E. College Street and Hedge Street, traffic movement becomes more predictable and easier to manage, reducing potential conflict points between vehicles, pedestrians, and cyclists. Fewer access points also enhance roadway safety by minimizing turning movements and improving sight distances along adjacent streets. Overall, limiting vehicle access points contributes to a safer, more attractive, and functionally efficient development. Utilities This project will be served by Greenville Water, City of Simpsonville Sewer, and Duke Energy. Duke Energy will locate transformers on the development site. Existing utilities and connections will be used wherever possible. The Development Agreement between Blue Ridge Holdings, LLC and the City of Simpsonville states that the City will use its best efforts to relocate utilities in the public right-of-way, creating a cleaner, less-cluttered aesthetic. Burdette North Statement of Intent Blue Ridge Land Holdings, LLC October 17, 2025 – Page 4 of 4 © 2025 by Alliance Consulting Engineers, Inc. All information contained in this document is the property of Alliance Consulting Engineers, Inc. All rights reserved. No part of this document may be reproduced or transmitted in any form or by any means, electronic, mechanical, photocopying, recording, or otherwise, without prior explicit written permission of Alliance Consulting Engineers, Inc. Stormwater Because the site consists of mostly impervious surface, major stormwater infrastructure improvements are not anticipated being needed, as this project assumes zero increase in runoff. If required through Detailed Design, additional Stormwater Management will be coordinated and compliant with Greenville County under its Stormwater Standards. Signage Burdette North will utilize monument signage where feasible on the site and within the City’s Sign Ordinance requirements. The signage type and design will closely resemble existing signage at Burdette Central to maintain consistency of brand. Landscaping The developer and design team will adhere to all landscaping requirements as required by City Ordinance. Wherever possible, with Client direction, the team will strive to exceed requirements. Conclusion Burdette North represents the next evolution of downtown Simpsonville—an innovative, mixed-use community that strengthens the city’s identity, supports local business, and creates a vibrant, connected environment for residents and visitors alike. Through thoughtful design, sustainable features, and a commitment to quality development, this project will serve as a catalyst for continued downtown growth and exemplify the purpose and intent of the Innovative Development (ID) zoning designation. FLOOR 01 0" FLOOR 02 15' - 4" FLOOR 03 27' - 0" ROOF BRG. 37' - 0" FLOOR 01 0" FLOOR 02 15' - 4" FLOOR 03 27' - 0" ROOF BRG. 37' - 0" COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MA Y NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PER MISSION ELEVATIONS | SD04 PROJECT #: 2566 SHEET DATE: 10/13/2025 BURDETTE NORTH CLIENT NAME ADDRESS 1 CITY, STATE ZIP 1" = 10'-0" E COLLEGE STREET - EXTERIOR ELEVATION 1" = 10'-0" NE MAIN STREET - EXTERIOR ELEVATION PEDESTRIAN ACCESS TO COURTYARD NOTE: SIGNAGE IS SUBJECT TO CHANGE. DRAWINGS REPRESENT CONCEPTS AND POTENTIAL LOCATIONS AT THIS PHASE FINAL SELECTION OF MATERIALS AND COLOR MAY VARY BRICK VENEER ALUMINUM RAILINGS @ BALCONIES ACCENT PANELING HORIZONTAL SIDING CORNICE DETAILING STOREFRONT ENTRY PLANTERS OPTIONAL BUILDING SIGNAGE CANOPIES AT COMMERCIAL ENTRY COVERED PATIO SEATING LEASING OFFICE ENTRY AWNINGS OVER SMALLER SCALE COMMERCIAL SUITES STREET FACING COMMERCIAL SUITES COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MA Y NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PER MISSION RENDERING | SD05 PROJECT #: 2566 SHEET DATE: 10/13/2025 BURDETTE NORTH CLIENT NAME ADDRESS 1 CITY, STATE ZIP VIEW @ CORNER OF NE MAIN STREET & E COLLEGE STREET 3,711 SF AMENITY / LEASING 4,354 SF RESTAURANT SPACE LOBBY 4,136 SF CO-WORKING 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 524 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 647 SF COM. SUITES SHARED BATHROOMS (SUITES & AMENITY) 355 SF CORE/UTILITY COURTYARD AREA BREEZEWAY PATIO SEATING 715 SF THD (2 BED) 715 SF THD (2 BED) 715 SF THD (2 BED) 715 SF THD (2 BED) 715 SF THD (2 BED) 715 SF THD (2 BED) 3,348 SF COMMERCIAL EAST COLLEGE STREET NORTHEAST MAIN STREET 67' - 0" 191' - 8" 23' - 4" 67' - 0" 266' - 4" INDOOR/OUTDOOR SEATING 585 SF THD 585 SF THD 638 SF THB 513 SF THA 513 SF THA 513 SF THA 513 SF THA 513 SF THA 635 SF 1 BED 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,134 SF 2 BED 686 SF 1 BED 962 SF 2 BED 1,074 SF 2 BED 149 SF UTILITY 773 SF 1+ BED 1,049 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 686 SF 1 BED 1,049 SF 2 BED 773 SF 1+ BED 962 SF 2 BED 672 SF 1 BED 672 SF 1 BED 972 SF 2 BED 585 SF THD 585 SF THD 585 SF THD 585 SF THD 30' - 6" 6' - 0" 30' - 6" 67' - 0" 282' - 0" 266' - 4" 585 SF 1 BED 585 SF 1 BED 1,174 SF 3 BED 1,049 SF 2 BED 1,049 SF 2 BED 635 SF 1 BED 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,134 SF 2 BED 686 SF 1 BED 962 SF 2 BED 1,074 SF 2 BED 149 SF UTILITY 773 SF 1+ BED 1,049 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 686 SF 1 BED 1,049 SF 2 BED 773 SF 1+ BED 962 SF 2 BED 672 SF 1 BED 672 SF 1 BED 972 SF 2 BED 585 SF 1 BED 585 SF 1 BED 585 SF 1 BED 585 SF 1 BED LEGEND 1 BED 1+ BED 2 BED 3 BED AMENITY CO-WORKING COMMERCIAL 1 RESTAURANT STUDIO TH - 1+ BED TH - 2 BED UTILITY COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION OPTION 1 | SD01 PROJECT #: 2566 SHEET DATE: 10/13/2025 BURDETTE NORTH CLIENT NAME ADDRESS 1 CITY, STATE ZIP 1" = 30'-0" OPTION 1 -LEVEL 1 1 1" = 30'-0" OPTION 1 -LEVEL 2 2 1" = 30'-0" OPTION 1 -LEVEL 3 3 NORTH 3,707 SF AMENITY / LEASING 4,354 SF RESTAURANT SPACE LOBBY 3,967 SF COMMERCIAL 4,770 SF CO-WORKING 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 640 SF THB (2 BED) 524 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 649 SF COM. SUITES SHARED BATHROOMS (SUITES & AMENITY) 355 SF CORE/UTILITY FIRE STAIR COURTYARD BREEZEWAY PATIO SEATING 524 SF THC (2 BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 513 SF THA (1+ BED) 67' - 0" 23' - 4" 191' - 8" 67' - 0" 266' - 4" 524 SF THC-2 513 SF THA-2 640 SF THB-2 513 SF THA-2 513 SF THA-2 513 SF THA-2 513 SF THA-2 513 SF THA-2 637 SF 1 BED 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,133 SF 2 BED 686 SF 1 BED 991 SF 2 BED 1,043 SF 2 BED 149 SF UTILITY 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,223 SF 3 BED 513 SF THA-2 513 SF THA-2 513 SF THA-2 513 SF THA-2 266' - 4" 30' - 6" 6' - 0" 30' - 6" 282' - 0" 67' - 0" 637 SF 1 BED 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,133 SF 2 BED 1,020 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,223 SF 3 BED 524 SF 1 BED 513 SF STUDIO 1,049 SF 2 BED 1,049 SF 2 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 1,043 SF 2 BED 991 SF 2 BED 686 SF 1 BED 1,049 SF 2 BED 1,049 SF 2 BED 513 SF STUDIO 640 SF 1 BED 149 SF UTILITY LEGEND 1 BED 1+ BED 2 BED 3 BED AMENITY CO-WORKING COMMERCIAL 1 RESTAURANT STUDIO TH - 1+ BED TH - 2 BED UTILITY COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION OPTION 2 | SD02 PROJECT #: 2566 SHEET DATE: 10/13/2025 BURDETTE NORTH CLIENT NAME ADDRESS 1 CITY, STATE ZIP 1" = 30'-0" OPTION 2 -LEVEL 1 1 1" = 30'-0" OPTION 2 -LEVEL 2 2 1" = 30'-0" OPTION 2 -LEVEL 3 3 NORTH 3,723 SF AMENITY / LEASING 4,354 SF RESTAURANT SPACE RES. LOBBY 3,970 SF COMMERCIAL 4,770 SF CO-WORKING 524 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 536 SF COM. SUITES 649 SF COM. SUITES SHARED BATHROOMS (SUITES & AMENITY) 355 SF CORE/UTILITY FIRE COURTYARD BREEZEWAY PATIO SEATING 524 SF 1 BED 513 SF STUDIO 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 812 SF 1+ BED 266' - 4" 67' - 0" 23' - 3 1/2" 191' - 8 1/2" 67' - 0" 30' - 6" 6' - 0" 30' - 6" 524 SF 1 BED 513 SF STUDIO 812 SF 1+ BED 1,049 SF 2 BED 686 SF 1 BED 637 SF 1 BED 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,133 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 1,030 SF 2 BED 149 SF UTILITY 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,223 SF 3 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 524 SF 1 BED 513 SF STUDIO 812 SF 1+ BED 1,049 SF 2 BED 686 SF 1 BED 637 SF 1 BED 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 513 SF STUDIO 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,133 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 1,030 SF 2 BED 149 SF UTILITY 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 1,020 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED 686 SF 1 BED 1,223 SF 3 BED 1,049 SF 2 BED 1,049 SF 2 BED 686 SF 1 BED LEGEND 1 BED 1+ BED 2 BED 3 BED AMENITY CO-WORKING COMMERCIAL 1 RESTAURANT STUDIO TH - 1+ BED TH - 2 BED UTILITY COPYRIGHT 2025 - SHLTR ARCHITECTS, LLC | ALL RIGHTS RESERVED - PRINTED OR ELECTRONIC DRAWINGS AND DOCUMENTATION MAY NOT BE REPRODUCED IN ANY FORM WITHOUT WRITTEN PERMISSION OPTION 3 | SD03 PROJECT #: 2566 SHEET DATE: 10/13/2025 BURDETTE NORTH CLIENT NAME ADDRESS 1 CITY, STATE ZIP 1" = 30'-0" OPTION 3 - LEVEL 1 1 1" = 30'-0" OPTION 3 - LEVEL 2 2 1" = 30'-0" OPTION 3 - LEVEL 3 3 NORTH October 17, 2025 G r e e n v ille C o u n t y , S C G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille , S o u t h C a r o lin a , G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille C o u n t y , S o u t h C a r o lin a G I S D iv is io n O c t o b e r 3 0 , 2 0 2 5 0 1 5 0 3 0 07 5 f t 0 4 0 8 02 0 m 1 : 1 , 6 0 0 D is c la im e r : T h is M a p is n o t a L A N D S U R V E Y a n d is f o r r e f e r e n c e p u r p o s e s o n ly . D a t a c o n t a in e d in t h is m a p a r e p r e p a r e d f o r t h e in v e n t o r y o f R e a l P r o p e r t y f o u n d w it h in t h is ju r is d ic t io n , a n d a r e G r e e n v ille C o u n t y , S C G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille , S o u t h C a r o lin a , G r e e n v ille C o u n t y G I S D iv is io n , G r e e n v ille C o u n t y , S o u t h C a r o lin a G I S D iv is io n O c t o b e r 3 0 , 2 0 2 5 0 1 5 0 3 0 07 5 f t 0 4 0 8 02 0 m 1 : 1 , 6 0 0 D is c la im e r : T h is M a p is n o t a L A N D S U R V E Y a n d is f o r r e f e r e n c e p u r p o s e s o n ly . D a t a c o n t a in e d in t h is m a p a r e p r e p a r e d f o r t h e in v e n t o r y o f R e a l P r o p e r t y f o u n d w it h in t h is ju r is d ic t io n , a n d a r e Know what's below.Call before you dig. CIVIL ENGINEERS - SURVEYORS - LANDSCAPE ARCHITECTS225 ROCKY CREEK ROAD, GREENVILLE, SC 29615PH:(864)271-0496www.sitedesign-inc.com 1 NOVEMBER 5, 2025 IMPACT DESIGNS, INC. Prepared by: Allen J. Reid, PE TRAFFIC IMPACT STUDY Burdette North Simpsonville, South Carolina Burdette North | i Table of Contents EXECUTIVE SUMMARY ................................................................................................................. iii 1. INTRODUCTION ......................................................................................................................... 1 1.1. Project Summary .............................................................................................................. 1 1.2. Existing Roadway Conditions .......................................................................................... 1 1.3. Planned Roadway Improvements .................................................................................... 2 1.4. Driveway Locations .......................................................................................................... 2 2. TRAFFIC VOLUME DEVELOPMENT..................................................................................... 7 2.1. Existing Traffic Volumes .................................................................................................. 7 2.2. Rerouted Traffic Volumes ................................................................................................ 7 2.3. Projected Traffic Volumes ............................................................................................... 7 2.4. Proposed Development Traffic Volumes ........................................................................ 8 2.5. Future Build Traffic Volumes ......................................................................................... 8 3. TRAFFIC IMPACT ANALYSIS ............................................................................................... 16 3.1. Turn Lane Analysis ........................................................................................................ 16 3.2. Intersection LOS Analysis .............................................................................................. 16 4. SUMMARY OF FINDINGS ....................................................................................................... 20 Burdette North | ii Tables Table 1 – Study Area Summary .................................................................................................................... 1 Table 2 – Trip Generation ............................................................................................................................. 8 Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections ............................. 16 Table 4 – Intersection Capacity Analysis Results ....................................................................................... 17 Figures Figure 1 – Project Location ........................................................................................................................... 3 Figure 2 – Conceptual Site Plan .................................................................................................................... 4 Figure 3 – Existing Lane Configuration ....................................................................................................... 5 Figure 4 – No-Build Lane Configuration ...................................................................................................... 6 Figure 5 – Raw Existing (2025) Traffic Volumes ........................................................................................ 9 Figure 6 – One-Way Volume Adjustments ................................................................................................. 10 Figure 7 – Adjusted Existing (2025) Traffic Volumes ............................................................................... 11 Figure 8 – No-Build (2028) Traffic Volumes ............................................................................................. 12 Figure 9 – Site Trip Distribution ................................................................................................................. 13 Figure 10 – Site Trip Assignments ............................................................................................................. 14 Figure 11 – Build (2028) Traffic Volumes ................................................................................................. 15 Figure 12 – Recommended Lane Configuration ......................................................................................... 19 Appendices A) Traffic Count Data B) Turn Lane Analysis C) Synchro Analysis Reports D) SimTraffic Analysis Reports E) Background Improvements Burdette North | iii EXECUTIVE SUMMARY A traffic impact study was conducted for the proposed Burdette North development in accordance with SCDOT guidelines. The proposed development is located on the southeast corner of College Street and NE Main Street (SC 417) , in Simpsonville, South Carolina. The development is expected to consist of 12 ,812 square feet of retail and up to 80 multi-family units and is anticipated to be constructed by the end of 2028. Direct access to Burdette North development is proposed to be provided via two full movement connections: one on Hedge Street and one on College Street. The development is expected to have parallel parking along Hedge Street, however, to be conservative all traffic was assumed to access the site through the site accesses. A turn lane analysis was conducted at the site accesses utilizing the Build (2028) volumes. Based on build - out volumes, there are no turn lanes warranted at the site accesses. The capacity analysis indicates that the signalized study intersections approaches are expected to maintain their LOS from No -Build to Build conditions, except for the northbound and southbound approach of NE Main Street (SC 417) and Curtis Street. Although, the approaches are expected to operate at LOS D or better in the Build scenario, which is still considered acceptable. Therefore, there is no mitigation recommended at the signalized intersections. Additionally, the unsignalized study intersections are expected to operate at an LOS C or better in all scenarios. The site accesses are expected to operate at LOS B or better in the Build scenario. Therefore, there is no mitigation recommended at the study intersections based on the capacity analysis. Recommendations: • None Burdette North | 1 1. INTRODUCTION The purpose of this report is to summarize the traffic impact study that was completed for the Burdette North site in Simpsonville, South Carolina. The study was developed in accordance with SCDOT guidelines. This report summarizes the procedures and findings of the traffic impact study. 1.1. Project Summary The proposed development is located on the southeast corner of College Street and NE Main Street (SC 417), in Simpsonville, South Carolina. The development is expected to consist of 12, 812 square feet of retail and up to 80 multi-family units and is anticipated to be constructed by the end of 2028. This traffic impact study analyzes the effects of the additional traffic associated with the proposed development during the weekday AM (7:00 AM - 9:00 AM) and the weekday PM (4:00 PM - 6:00 PM) peak periods. The study area for the purpose of the analysis includes: • NE Main Street (SC 417) and College Street • NE Main Street (SC 417) and Curtis Street • Hedge Street and College Street • Hedge Street and Curtis Street • Main Street and College Street • Main Street and Curtis Street • Hedge Street and Access A • College Street and Access B The proposed development is expected to be built out by the end of 2028; therefore, 2028 was considered as the future year for the purpose of this analysis. Refer to Figures 1 and 2 for the site location and the conceptual site plan. 1.2. Existing Roadway Conditions The primary roadways within the study area include NE Main Street ( SC 417), Curtis Street and College Street. A summary of their existing characteristics is shown in Table 1. Table 1 – Study Area Summary Facility Name Route # Typical Cross Section Posted Speed Limit Maintained By 2024 AADT College Street N/A 2-lane undivided 25 MPH Local No Data Curtis Street 2-lane undivided 25 MPH SCDOT/Local 6,200 NE Main Street SC 417 2-lane undivided 35 MPH SCDOT 19,400 Refer to Figure 3 for an illustration of the existing geometry and traffic control at the study intersections. Burdette North | 2 1.3. Planned Roadway Improvements The City of Simpsonville and SCDOT intend to construct a project to convert Curtis Street and College Street to a one-way pair with counterclockwise circulation. Based on the information provided by SCDOT and City staff, the following geometric improvements are proposed: Curtis Street • Convert the existing 2-lane road to a one-way two-lane road travelling eastbound. • Adjust all intersections along Curtis Street to account for the approach restrictions. College Street • Convert the existing 2-lane road to a one-way two-lane road travelling westbound. • Adjust all intersections along College Street to account for the approach restrictions. College Street and NE Main Street (SC 417) • Extend the northbound left turn lane to have 150 feet of storage. Curtis Street and NE Main Street (SC 417) • Extend the southbound left turn lane to have 225 feet of storage. It was assumed that these projects would be completed prior to the build out of the Burdette North development. Refer to Figure 4 for an illustration of the background improvements. Refer to Appendix E for improvement plans and drawings. 1.4. Driveway Locations Direct access to Burdette North development is proposed to be provided via two full movement connections: one on Hedge Street and one on College Street. The development is expected to have parallel parking along Hedge Street, however, to be conservative all traffic was assumed to access the site through the site accesses. ±99,000-SF Mixed-Use DevelopmentLocated Along North East Main StreetCity of SimpsonvilleGreenville County, South Carolina N Project No.: 25195-0023October 9, 2025Prepared by Alliance Consulting Engineers, Inc. Documents prepared or furnished by Alliance Consulting Engineers, Inc. are instruments of service, and Alliance Consulting Engineers, Inc. retainsan ownership and property interest (including the copyright and the right of reuse) in such documents, whether or not the project is completed.NOTE: BOUNDARIES, TOPOGRAPHY, WETLANDS, AND STREAMS LOCATIONS ARE APPROXIMATE BASED OFF GEOGRAPHICINFORMATION SYSTEMS (GIS). A BOUNDARY AND TOPOGRAPHIC SURVEY ALONG WITH A WETLAND DELINEATION SHOULD BEPERFORMED TO DETERMINE ACCURATE BOUNDARY, TOPOGRAPHIC, AND WETLAND LOCATIONS. 7 11 4 9 1210 2426 10 SITE INFORMATION:TM#: 0315000200100, 0315000200400SIZE: ±2.52 ACRESEXISTING ZONING: B-U (BUSINESS - URBAN)PROPOSED ZONING: ID (INNOVATIVE DEVELOPMENT)SETBACKS: -FRONT = NONE-SIDE = NONE-REAR = NONEPARKING REQUIREMENTS:STALL WIDTH90-DEGREE STALL= 9-FT X 18FT24-FT AISLEPROVIDED PARKING COUNT: 144 SPACESPASSENGER: 139 SPACESADA: 5 SPACESPROPOSED BUILDING:MIXED USE DEVELOPMENT3 STORIES EAST COLLEGE STREET HEDGE STREET NORTH EAST MAIN STREET ±99,000-SFMIXED USEDEVELOPMENT PROPOSED BUILDING INFORMATION:RESIDENTIALAMENITYRETAILCOMMERCIALTOTAL LEVEL 113,9946,1478,9913,82332,955 LEVEL 232,95532,955 LEVEL 332,95532,955 TOTAL79,9046,1478,9913,82398,865 RESIDENTIAL UNIT COUNT: 73 Blue Ridge Land Holdings, LLC NORTH MAIN STREET10 12 13 Burdette North | 7 2. TRAFFIC VOLUME DEVELOPMENT 2.1. Existing Traffic Volumes Existing turning movement counts were conducted at the study intersections in September 2025, during the AM (7:00 AM to 9:00 AM) peak period and the PM (4:00 PM to 6:00 PM) peak period. The 2025 traffic volumes are illustrated in Figure 5. 2.2. Rerouted Traffic Volumes As previously mentioned, the City of Simpsonville and SCDOT intend to construct a project to convert Curtis Street and College Street to a one-way pair with counterclockwise circulation. Due to adjustment to the path of travel, it was assumed that eastbound traffic on College Street will become eastbound traffic on Curtis Street and westbound traffic on Curtis Street will become westbound traffic on College Street. Refer to Figure 6 and 7 for an illustration of the rerouted volumes on the study network. 2.3. Projected Traffic Volumes Based on SCDOT Average Annual Daily Traffic (AADT) volumes, daily traffic volumes in the study area have grown at a rate of 2 % in the past years. A 2% annual growth rate was applied to the 2025 rerouted volumes to develop the No-Build (2028) volumes. This growth rate was applied to account for all background growth in the area without any adjacent and/or the proposed developments. Refer to Figure 8 for an illustration of the No-Build (2028) traffic volumes at the study intersections. Burdette North | 8 2.4. Proposed Development Traffic Volumes As mentioned previously, the proposed development is expected to consist of 12,812 square feet of retail and up to 80 multi-family units and is anticipated to be constructed by the end of 2028 . The trip generation potential for the proposed development was estimated utilizing methodology contained within the ITE’s Trip Generation Manual, 11th Edition. Utilizing ITE dat a for ITE Code s 220 and 822 , traffic volumes were generated for the weekday daily, the weekday AM peak hour, and the weekday PM peak hour. Refer to Table 2 for a summary of the trip generation potential of the proposed development. Table 2 – Trip Generation ITE Land Use (Code) Density Independent Variable Daily Traffic AM Peak PM Peak Enter Exit Enter Exit Strip Retail Plaza (<40k) (ITE Code 822) 12.81 KSF 698 18 12 42 42 Multi-Family Housing (Low-Rise) (ITE Code 220) 80 Dwelling Units 588 11 37 35 20 Total New Trips 1,286 29 49 77 62 Traffic associated with the proposed development was distributed and assigned to the roadway network based upon existing travel patterns and are summarized below: • 30% to/from the north via NE Main Street (SC 417) • 15% to/from the south vis NE Main Street (SC 417) • 10% to/from the south via Hedge Street • 25% to the east via Curtis Street • 25% from the east via College Street • 20% to the west via College Street • 20% from the west via College Street Refer to Figures 9 and 10 for the site trip distributions and assignments. 2.5. Future Build Traffic Volumes The site generated traffic volumes were added to the No-Build (2028) traffic volumes to determine the Build (2028) volumes. The Build (2028) volumes are illustrated in Figure 11. Burdette North | 16 3. TRAFFIC IMPACT ANALYSIS 3.1. Turn Lane Analysis A turn lane analysis was conducted at the site accesses utilizing the Build (2028) volumes. Based on build- out volumes, there are no turn lanes warranted at the site accesses. Refer to Appendix B for the turn lane warrants with the volumes graphed. 3.2. Intersection LOS Analysis Using the existing , no-build, and build traffic volumes, intersection analyses were conducted for the study intersections under Existing (2025) conditions, No-Build (2028) conditions and Build (2028) conditions. This analysis was conducted using the Transportation Research Board’s Highway Capacity Manual (HCM 6 th Edition) methodologies of the Synchro, Version 11 software. Intersection level of service (LOS) grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, forced-flow (bumper -to-bumper) conditions with high vehicular delays, and are generally considered undesirable. Table 3 summarizes the HCM 6 th Edition control delay thresholds associated with each LOS grade for signalized and unsignalized intersections. Table 3 – HCM 6th Edition LOS Criteria for Signalized & Unsignalized Intersections Signalized Intersections Unsignalized Intersections LOS Control Delay per Vehicle (seconds) LOS Control Delay per Vehicle (seconds) A ≤ 10 A ≤ 10 B > 10 and ≤ 20 B > 10 and ≤ 15 C > 20 and ≤ 35 C > 15 and ≤ 25 D > 35 and ≤ 55 D > 25 and ≤ 35 E > 55 and ≤ 80 E > 35 and ≤ 50 F > 85 F > 50 The results of the capacity analysis for the study intersections under existing traffic control are summarized in Table 4. Refer to Appendix C for the detailed capacity analysis reports and Appendix D for the queuing analysis results. Burdette North | 17 Table 4 – Intersection Capacity Analysis Results Intersections Approach LOS (Delay in seconds per vehicle) Existing (2025) No-Build (2028) Build (2028) AM PM AM PM AM PM NE Main Street (SC 417) & College Street EB C (26.0) D (45.0) Analyzed under Existing conditions only WB D (45.5) E (56.8) D (38.0) D (48.6) D (39.8) D (52.9) NB B (18.5) A (9.8) A (4.0) A (3.0) A (4.1) A (3.6) SB B (19.3) B (14.2) C (25.8) C (30.5) C (26.5) C (34.0) Overall C (26.4) C (23.4) C (25.7) C (28.4) C (26.9) C (31.8) NE Main Street (SC 417) & Curtis Street EB C (30.0) D (54.0) D (43.9) D (54.0) D (44.0) D (54.9) WB C (29.5) D (46.8) Analyzed under Existing conditions only NB C (23.5) C (20.4) B (18.2) C (34.1) B (18.4) D (36.3) SB A (6.8) B (10.6) A (2.5) A (9.1) A (2.6) B (13.0) Overall C (20.1) C (25.6) B (18.0) C (28.9) B (18.0) C (31.4) Hedge Street & College Street EB - - Analyzed under Existing conditions only WB A (8.0) A (8.6) - - - - NB B (12.0) B (12.6) C (21.0) B (14.2) C (21.8) B (14.9) Hedge Street & Curtis Street EB A (8.8) B (17.2) A (6.9) B (10.2) A (7.6) B (11.2) WB B (19.1) B (19.8) Analyzed under Existing conditions only NB D (42.7) D (44.6) B (19.6) D (38.3) B (19.9) D (41.1) SB D (50.8) D (51.3) D (49.8) D (51.2) D (49.5) D (52.4) Overall C (25.3) C (27.9) B (19.0) B (19.2) B (19.7) C (20.8) Main Street & College Street EB A (7.7) A (7.6) Analyzed under Existing conditions only WB A (7.6) A (7.8) - - - - NB A (9.2) B (10.9) B (12.2) B (13.1) B (12.3) B (13.2) SB A (9.8) B (10.7) B (10.4) B (11.8) B (10.5) B (11.9) Main Street & Curtis Street EB A (7.8) A (7.8) - - - - WB A (7.8) A (7.9) Analyzed under Existing conditions only NB B (12.2) B (11.7) B (10.6) B (10.6) B (10.6) B (10.7) SB B (10.2) B (11.7) B (12.4) B (13.4) B (12.4) B (13.6) Hedge Street & Access A EB Analyzed under Build conditions only B (10.0) A (9.8) NB A (7.8) A (7.7) SB - - College Street & Access B WB Analyzed under Build conditions only - - NB B (12.8) B (11.2) Burdette North | 18 The capacity analysis indicates that the signalized study intersection s approaches are expected to maintain their LOS from No -Build to Build conditions , except for the northbound and southbound approach of NE Main Street (SC 417) and Curtis Street. Although, the approaches are expected to operate at LOS D or better in the Build scenario, which is still considered acceptable. Therefore, there is no mitigation recommended at the signalized intersections. Additionally, the unsignalized study intersections are expected to operate at an LOS C or better in all scenarios. The site accesses are expected to operate at LOS B or better in the Build scenario. Therefore, there is no mitigation recommended at the study intersections based on the capacity analysis. Figure 12 shows the proposed lane configurations and traffic control for the Build (2028) conditions. Burdette North | 20 4. SUMMARY OF FINDINGS A traffic impact study was conducted for the proposed Burdette North development in accordance with SCDOT guidelines. The proposed development is located on the southeast corner of College Street and NE Main Street (SC 417) , in Simpsonville, South Carolina. The development is expected to consist of 12 ,812 square feet of retail and up to 80 multi-family units and is anticipated to be constructed by the end of 2028. Direct access to Burdette North development is proposed to be provided via two full movement connections: one on Hedge Street and one on College Street. The development is expected to have parallel parking along Hedge Street, however, to be conservative all traffic was assumed to access the site through the site accesses. A turn lane analysis was conducted at the site accesses utilizing the Build (2028) volumes. Based on build - out volumes, there are no turn lanes warranted at the site accesses. The capacity analysis indicates that the signalized study intersections approaches are expected to maintain their LOS from No -Build to Build conditions, except for the northbound and southbound approach of NE Main Street (SC 417) and Curtis Street. Although, the approaches are expected to operate at LOS D or better in the Build scenario, which is still considered acceptable. Therefore, there is no mitigation recommended at the signalized intersections. Additionally, the unsignalized study intersections are expected to operate at an LOS C or better in all scenarios. The site accesses are expected to operate at LOS B or better in the Build scenario. Therefore, there is no mitigation recommended at the study intersections based on the capacity analysis. Recommendations: • None TECHNICAL APPENDIX APPENDIX A TRAFFIC COUNT DATA File Name : Simpsonville(01 - SC 417 and College Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks SC 417 Southbound College Street Westbound SC 417 Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 07:00 AM 7 71 2 0 80 18 41 61 0 120 0 87 6 1 94 1 16 1 1 19 313 07:15 AM 12 80 2 0 94 17 37 68 1 123 2 126 4 0 132 4 28 1 4 37 386 07:30 AM 14 124 5 0 143 13 60 56 0 129 1 139 2 1 143 10 31 1 2 44 459 07:45 AM 14 121 4 0 139 15 54 50 0 119 2 154 2 0 158 15 29 1 1 46 462 Total 47 396 13 0 456 63 192 235 1 491 5 506 14 2 527 30 104 4 8 146 1620 08:00 AM 17 137 3 0 157 19 54 44 0 117 1 126 6 0 133 8 33 4 2 47 454 08:15 AM 16 133 7 0 156 17 32 46 0 95 2 133 6 0 141 3 32 6 1 42 434 08:30 AM 13 101 3 0 117 10 41 40 0 91 3 125 6 0 134 8 27 2 0 37 379 08:45 AM 18 102 4 0 124 8 40 41 0 89 2 118 4 0 124 15 27 2 0 44 381 Total 64 473 17 0 554 54 167 171 0 392 8 502 22 0 532 34 119 14 3 170 1648 Grand Total 111 869 30 0 1010 117 359 406 1 883 13 1008 36 2 1059 64 223 18 11 316 3268 Apprch % 11 86 3 0 13.3 40.7 46 0.1 1.2 95.2 3.4 0.2 20.3 70.6 5.7 3.5 Total % 3.4 26.6 0.9 0 30.9 3.6 11 12.4 0 27 0.4 30.8 1.1 0.1 32.4 2 6.8 0.6 0.3 9.7 Cars + 110 846 28 0 984 114 355 405 1 875 13 988 35 2 1038 63 218 18 11 310 3207 % Cars + 99.1 97.4 93.3 0 97.4 97.4 98.9 99.8 100 99.1 100 98 97.2 100 98 98.4 97.8 100 100 98.1 98.1 Trucks 1 23 2 0 26 3 4 1 0 8 0 20 1 0 21 1 5 0 0 6 61 % Trucks 0.9 2.6 6.7 0 2.6 2.6 1.1 0.2 0 0.9 0 2 2.8 0 2 1.6 2.2 0 0 1.9 1.9 File Name : Simpsonville(01 - SC 417 and College Street) Site Code : Start Date : 9/24/2025 Page No : 2 SC 417 Southbound College Street Westbound SC 417 Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 14 124 5 0 143 13 60 56 0 129 1 139 2 1 143 10 31 1 2 44 459 07:45 AM 14 121 4 0 139 15 54 50 0 119 2 154 2 0 158 15 29 1 1 46 462 08:00 AM 17 137 3 0 157 19 54 44 0 117 1 126 6 0 133 8 33 4 2 47 454 08:15 AM 16 133 7 0 156 17 32 46 0 95 2 133 6 0 141 3 32 6 1 42 434 Total Volume 61 515 19 0 595 64 200 196 0 460 6 552 16 1 575 36 125 12 6 179 1809 % App. Total 10.3 86.6 3.2 0 13.9 43.5 42.6 0 1 96 2.8 0.2 20.1 69.8 6.7 3.4 PHF .897 .940 .679 .000 .947 .842 .833 .875 .000 .891 .750 .896 .667 .250 .910 .600 .947 .500 .750 .952 .979 Cars + 61 498 17 0 576 62 198 195 0 455 6 541 16 1 564 36 122 12 6 176 1771 % Cars + 100 96.7 89.5 0 96.8 96.9 99.0 99.5 0 98.9 100 98.0 100 100 98.1 100 97.6 100 100 98.3 97.9 Trucks 0 17 2 0 19 2 2 1 0 5 0 11 0 0 11 0 3 0 0 3 38 % Trucks 0 3.3 10.5 0 3.2 3.1 1.0 0.5 0 1.1 0 2.0 0 0 1.9 0 2.4 0 0 1.7 2.1 SC 417 College Street College Street SC 417 Right 17 2 19 Thru 498 17 515 Left 61 0 61 Peds 0 0 0 InOut Total 772 576 1348 12 19 31 784 1379 595 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 195 1 196 Thru 198 2 200 Left 62 2 64 Peds 0 0 0 OutTotal In 199 455 654 3 5 8 202 662 460 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 6 0 6 Thru 541 11 552 Right 16 0 16 Peds 1 0 1 Out TotalIn 572 564 1136 19 11 30 591 1166 575 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 36 0 36 Thru 122 3 125 Right 12 0 12 Peds 6 0 6 TotalOut In 221 176 397 4 3 7 225 404 179 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 07:30 AM Cars + Trucks Peak Hour Data North File Name : Simpsonville(01 - SC 417 and College Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks SC 417 Southbound College Street Westbound SC 417 Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 04:00 PM 43 174 4 0 221 6 31 34 0 71 4 140 18 0 162 2 42 8 0 52 506 04:15 PM 30 155 7 0 192 11 44 25 0 80 3 129 22 0 154 8 43 9 0 60 486 04:30 PM 24 178 6 0 208 7 36 26 0 69 1 120 11 0 132 7 51 9 0 67 476 04:45 PM 32 145 5 0 182 12 37 28 1 78 3 123 20 0 146 8 42 7 0 57 463 Total 129 652 22 0 803 36 148 113 1 298 11 512 71 0 594 25 178 33 0 236 1931 05:00 PM 37 185 4 0 226 12 43 24 0 79 5 126 19 0 150 10 41 2 0 53 508 05:15 PM 38 146 3 2 189 6 38 23 1 68 2 110 16 0 128 4 51 10 0 65 450 05:30 PM 49 167 7 0 223 10 46 20 0 76 2 97 19 0 118 4 49 10 0 63 480 05:45 PM 53 153 5 0 211 11 31 16 0 58 5 114 24 0 143 2 67 6 0 75 487 Total 177 651 19 2 849 39 158 83 1 281 14 447 78 0 539 20 208 28 0 256 1925 Grand Total 306 1303 41 2 1652 75 306 196 2 579 25 959 149 0 1133 45 386 61 0 492 3856 Apprch % 18.5 78.9 2.5 0.1 13 52.8 33.9 0.3 2.2 84.6 13.2 0 9.1 78.5 12.4 0 Total % 7.9 33.8 1.1 0.1 42.8 1.9 7.9 5.1 0.1 15 0.6 24.9 3.9 0 29.4 1.2 10 1.6 0 12.8 Cars + 306 1296 41 2 1645 74 304 195 2 575 25 949 147 0 1121 45 386 60 0 491 3832 % Cars + 100 99.5 100 100 99.6 98.7 99.3 99.5 100 99.3 100 99 98.7 0 98.9 100 100 98.4 0 99.8 99.4 Trucks 0 7 0 0 7 1 2 1 0 4 0 10 2 0 12 0 0 1 0 1 24 % Trucks 0 0.5 0 0 0.4 1.3 0.7 0.5 0 0.7 0 1 1.3 0 1.1 0 0 1.6 0 0.2 0.6 File Name : Simpsonville(01 - SC 417 and College Street) Site Code : Start Date : 9/24/2025 Page No : 2 SC 417 Southbound College Street Westbound SC 417 Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:15 PM 04:15 PM 30 155 7 0 192 11 44 25 0 80 3 129 22 0 154 8 43 9 0 60 486 04:30 PM 24 178 6 0 208 7 36 26 0 69 1 120 11 0 132 7 51 9 0 67 476 04:45 PM 32 145 5 0 182 12 37 28 1 78 3 123 20 0 146 8 42 7 0 57 463 05:00 PM 37 185 4 0 226 12 43 24 0 79 5 126 19 0 150 10 41 2 0 53 508 Total Volume 123 663 22 0 808 42 160 103 1 306 12 498 72 0 582 33 177 27 0 237 1933 % App. Total 15.2 82.1 2.7 0 13.7 52.3 33.7 0.3 2.1 85.6 12.4 0 13.9 74.7 11.4 0 PHF .831 .896 .786 .000 .894 .875 .909 .920 .250 .956 .600 .965 .818 .000 .945 .825 .868 .750 .000 .884 .951 Cars + 123 659 22 0 804 41 160 103 1 305 12 493 72 0 577 33 177 27 0 237 1923 % Cars + 100 99.4 100 0 99.5 97.6 100 100 100 99.7 100 99.0 100 0 99.1 100 100 100 0 100 99.5 Trucks 0 4 0 0 4 1 0 0 0 1 0 5 0 0 5 0 0 0 0 0 10 % Trucks 0 0.6 0 0 0.5 2.4 0 0 0 0.3 0 1.0 0 0 0.9 0 0 0 0 0 0.5 SC 417 College Street College Street SC 417 Right 22 0 22 Thru 659 4 663 Left 123 0 123 Peds 0 0 0 InOut Total 629 804 1433 5 4 9 634 1442 808 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 103 0 103 Thru 160 0 160 Left 41 1 42 Peds 1 0 1 OutTotal In 372 305 677 0 1 1 372 678 306 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 12 0 12 Thru 493 5 498 Right 72 0 72 Peds 0 0 0 Out TotalIn 727 577 1304 5 5 10 732 1314 582 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 33 0 33 Thru 177 0 177 Right 27 0 27 Peds 0 0 0 TotalOut In 194 237 431 0 0 0 194 431 237 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 04:15 PM Cars + Trucks Peak Hour Data North File Name : Simpsonville(02 - SC 417 and Curtis Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks SC 417 Southbound Curtis Street Westbound SC 417 Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 07:00 AM 23 61 3 0 87 5 83 30 0 118 8 61 20 0 89 4 43 0 0 47 341 07:15 AM 30 73 2 0 105 9 88 27 1 125 10 102 17 0 129 2 38 1 0 41 400 07:30 AM 33 93 2 1 129 14 55 31 0 100 9 99 13 0 121 5 50 5 0 60 410 07:45 AM 25 103 8 0 136 10 61 43 0 114 3 97 6 0 106 12 44 3 0 59 415 Total 111 330 15 1 457 38 287 131 1 457 30 359 56 0 445 23 175 9 0 207 1566 08:00 AM 36 122 6 0 164 12 69 24 0 105 3 100 9 0 112 6 48 4 0 58 439 08:15 AM 24 124 5 0 153 15 50 24 0 89 7 114 15 0 136 2 47 1 0 50 428 08:30 AM 25 85 6 0 116 15 64 20 0 99 13 113 10 1 137 1 38 3 0 42 394 08:45 AM 28 79 6 0 113 15 54 16 0 85 6 100 6 1 113 10 40 6 0 56 367 Total 113 410 23 0 546 57 237 84 0 378 29 427 40 2 498 19 173 14 0 206 1628 Grand Total 224 740 38 1 1003 95 524 215 1 835 59 786 96 2 943 42 348 23 0 413 3194 Apprch % 22.3 73.8 3.8 0.1 11.4 62.8 25.7 0.1 6.3 83.4 10.2 0.2 10.2 84.3 5.6 0 Total % 7 23.2 1.2 0 31.4 3 16.4 6.7 0 26.1 1.8 24.6 3 0.1 29.5 1.3 10.9 0.7 0 12.9 Cars + 216 724 36 1 977 83 505 211 1 800 58 769 93 2 922 42 330 23 0 395 3094 % Cars + 96.4 97.8 94.7 100 97.4 87.4 96.4 98.1 100 95.8 98.3 97.8 96.9 100 97.8 100 94.8 100 0 95.6 96.9 Trucks 8 16 2 0 26 12 19 4 0 35 1 17 3 0 21 0 18 0 0 18 100 % Trucks 3.6 2.2 5.3 0 2.6 12.6 3.6 1.9 0 4.2 1.7 2.2 3.1 0 2.2 0 5.2 0 0 4.4 3.1 File Name : Simpsonville(02 - SC 417 and Curtis Street) Site Code : Start Date : 9/24/2025 Page No : 2 SC 417 Southbound Curtis Street Westbound SC 417 Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 33 93 2 1 129 14 55 31 0 100 9 99 13 0 121 5 50 5 0 60 410 07:45 AM 25 103 8 0 136 10 61 43 0 114 3 97 6 0 106 12 44 3 0 59 415 08:00 AM 36 122 6 0 164 12 69 24 0 105 3 100 9 0 112 6 48 4 0 58 439 08:15 AM 24 124 5 0 153 15 50 24 0 89 7 114 15 0 136 2 47 1 0 50 428 Total Volume 118 442 21 1 582 51 235 122 0 408 22 410 43 0 475 25 189 13 0 227 1692 % App. Total 20.3 75.9 3.6 0.2 12.5 57.6 29.9 0 4.6 86.3 9.1 0 11 83.3 5.7 0 PHF .819 .891 .656 .250 .887 .850 .851 .709 .000 .895 .611 .899 .717 .000 .873 .521 .945 .650 .000 .946 .964 Cars + 113 429 21 1 564 45 224 119 0 388 21 402 41 0 464 25 179 13 0 217 1633 % Cars + 95.8 97.1 100 100 96.9 88.2 95.3 97.5 0 95.1 95.5 98.0 95.3 0 97.7 100 94.7 100 0 95.6 96.5 Trucks 5 13 0 0 18 6 11 3 0 20 1 8 2 0 11 0 10 0 0 10 59 % Trucks 4.2 2.9 0 0 3.1 11.8 4.7 2.5 0 4.9 4.5 2.0 4.7 0 2.3 0 5.3 0 0 4.4 3.5 SC 417 Curtis Street Curtis Street SC 417 Right 21 0 21 Thru 429 13 442 Left 113 5 118 Peds 1 0 1 InOut Total 546 564 1110 11 18 29 557 1139 582 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 119 3 122 Thru 224 11 235 Left 45 6 51 Peds 0 0 0 OutTotal In 333 388 721 17 20 37 350 758 408 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 21 1 22 Thru 402 8 410 Right 41 2 43 Peds 0 0 0 Out TotalIn 487 464 951 19 11 30 506 981 475 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 25 0 25 Thru 179 10 189 Right 13 0 13 Peds 0 0 0 TotalOut In 266 217 483 12 10 22 278 505 227 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 07:30 AM Cars + Trucks Peak Hour Data North File Name : Simpsonville(02 - SC 417 and Curtis Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks SC 417 Southbound Curtis Street Westbound SC 417 Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 04:00 PM 44 130 12 0 186 12 33 21 0 66 15 135 29 4 183 8 41 3 0 52 487 04:15 PM 53 120 7 0 180 4 52 16 0 72 10 127 25 1 163 3 55 6 0 64 479 04:30 PM 61 118 7 0 186 10 47 27 0 84 8 111 19 6 144 7 50 1 0 58 472 04:45 PM 52 101 11 0 164 15 37 15 3 70 10 125 26 0 161 4 47 11 0 62 457 Total 210 469 37 0 716 41 169 79 3 292 43 498 99 11 651 22 193 21 0 236 1895 05:00 PM 47 135 12 0 194 5 48 22 0 75 12 120 27 1 160 4 58 4 0 66 495 05:15 PM 47 101 8 0 156 11 40 9 1 61 12 113 39 5 169 3 65 5 0 73 459 05:30 PM 56 124 19 2 201 8 50 6 2 66 12 102 37 0 151 3 64 3 0 70 488 05:45 PM 41 105 12 0 158 6 52 17 5 80 8 121 33 5 167 6 65 9 0 80 485 Total 191 465 51 2 709 30 190 54 8 282 44 456 136 11 647 16 252 21 0 289 1927 Grand Total 401 934 88 2 1425 71 359 133 11 574 87 954 235 22 1298 38 445 42 0 525 3822 Apprch % 28.1 65.5 6.2 0.1 12.4 62.5 23.2 1.9 6.7 73.5 18.1 1.7 7.2 84.8 8 0 Total % 10.5 24.4 2.3 0.1 37.3 1.9 9.4 3.5 0.3 15 2.3 25 6.1 0.6 34 1 11.6 1.1 0 13.7 Cars + 398 928 88 2 1416 69 350 131 10 560 86 944 230 20 1280 38 437 42 0 517 3773 % Cars + 99.3 99.4 100 100 99.4 97.2 97.5 98.5 90.9 97.6 98.9 99 97.9 90.9 98.6 100 98.2 100 0 98.5 98.7 Trucks 3 6 0 0 9 2 9 2 1 14 1 10 5 2 18 0 8 0 0 8 49 % Trucks 0.7 0.6 0 0 0.6 2.8 2.5 1.5 9.1 2.4 1.1 1 2.1 9.1 1.4 0 1.8 0 0 1.5 1.3 File Name : Simpsonville(02 - SC 417 and Curtis Street) Site Code : Start Date : 9/24/2025 Page No : 2 SC 417 Southbound Curtis Street Westbound SC 417 Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 47 135 12 0 194 5 48 22 0 75 12 120 27 1 160 4 58 4 0 66 495 05:15 PM 47 101 8 0 156 11 40 9 1 61 12 113 39 5 169 3 65 5 0 73 459 05:30 PM 56 124 19 2 201 8 50 6 2 66 12 102 37 0 151 3 64 3 0 70 488 05:45 PM 41 105 12 0 158 6 52 17 5 80 8 121 33 5 167 6 65 9 0 80 485 Total Volume 191 465 51 2 709 30 190 54 8 282 44 456 136 11 647 16 252 21 0 289 1927 % App. Total 26.9 65.6 7.2 0.3 10.6 67.4 19.1 2.8 6.8 70.5 21 1.7 5.5 87.2 7.3 0 PHF .853 .861 .671 .250 .882 .682 .913 .614 .400 .881 .917 .942 .872 .550 .957 .667 .969 .583 .000 .903 .973 Cars + 189 463 51 2 705 30 185 52 7 274 43 453 135 9 640 16 248 21 0 285 1904 % Cars + 99.0 99.6 100 100 99.4 100 97.4 96.3 87.5 97.2 97.7 99.3 99.3 81.8 98.9 100 98.4 100 0 98.6 98.8 Trucks 2 2 0 0 4 0 5 2 1 8 1 3 1 2 7 0 4 0 0 4 23 % Trucks 1.0 0.4 0 0 0.6 0 2.6 3.7 12.5 2.8 2.3 0.7 0.7 18.2 1.1 0 1.6 0 0 1.4 1.2 SC 417 Curtis Street Curtis Street SC 417 Right 51 0 51 Thru 463 2 465 Left 189 2 191 Peds 2 0 2 InOut Total 521 705 1226 5 4 9 526 1235 709 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 52 2 54 Thru 185 5 190 Left 30 0 30 Peds 7 1 8 OutTotal In 572 274 846 7 8 15 579 861 282 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 43 1 44 Thru 453 3 456 Right 135 1 136 Peds 9 2 11 Out TotalIn 514 640 1154 2 7 9 516 1163 647 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 16 0 16 Thru 248 4 252 Right 21 0 21 Peds 0 0 0 TotalOut In 279 285 564 6 4 10 285 574 289 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 05:00 PM Cars + Trucks Peak Hour Data North File Name : Simpsonville(03 - W. College Street and Main Street (DC) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Main Street Southbound College Street Westbound Main Street Northbound College Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 0 0 0 0 0 0 1 1 0 0 0 0 1 0 0 1 2 07:15 AM 0 0 1 1 0 0 3 3 0 0 0 0 0 0 0 0 4 07:30 AM 0 0 1 1 0 0 1 1 0 0 0 0 1 0 0 1 3 07:45 AM 0 0 3 3 2 0 1 3 0 0 2 2 0 0 0 0 8 Total 0 0 5 5 2 0 6 8 0 0 2 2 2 0 0 2 17 08:00 AM 1 0 3 4 0 0 1 1 0 0 2 2 0 0 0 0 7 08:15 AM 0 0 6 6 0 0 2 2 0 0 0 0 3 0 0 3 11 08:30 AM 0 0 3 3 4 0 3 7 0 0 1 1 1 0 0 1 12 08:45 AM 0 0 9 9 0 0 3 3 0 0 4 4 1 0 1 2 18 Total 1 0 21 22 4 0 9 13 0 0 7 7 5 0 1 6 48 Grand Total 1 0 26 27 6 0 15 21 0 0 9 9 7 0 1 8 65 Apprch % 3.7 0 96.3 28.6 0 71.4 0 0 100 87.5 0 12.5 Total % 1.5 0 40 41.5 9.2 0 23.1 32.3 0 0 13.8 13.8 10.8 0 1.5 12.3 Cars + 1 0 25 26 6 0 15 21 0 0 9 9 7 0 1 8 64 % Cars + 100 0 96.2 96.3 100 0 100 100 0 0 100 100 100 0 100 100 98.5 Trucks 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 % Trucks 0 0 3.8 3.7 0 0 0 0 0 0 0 0 0 0 0 0 1.5 File Name : Simpsonville(03 - W. College Street and Main Street (DC) Site Code : Start Date : 9/24/2025 Page No : 2 Main Street Southbound College Street Westbound Main Street Northbound College Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 1 0 3 4 0 0 1 1 0 0 2 2 0 0 0 0 7 08:15 AM 0 0 6 6 0 0 2 2 0 0 0 0 3 0 0 3 11 08:30 AM 0 0 3 3 4 0 3 7 0 0 1 1 1 0 0 1 12 08:45 AM 0 0 9 9 0 0 3 3 0 0 4 4 1 0 1 2 18 Total Volume 1 0 21 22 4 0 9 13 0 0 7 7 5 0 1 6 48 % App. Total 4.5 0 95.5 30.8 0 69.2 0 0 100 83.3 0 16.7 PHF .250 .000 .583 .611 .250 .000 .750 .464 .000 .000 .438 .438 .417 .000 .250 .500 .667 Main Street College Street College Street Main Street Right 21 Thru 0 Left 1 InOut Total 14 22 36 Right 9 Thru 0 Left 4 OutTotal In 8 13 21 Left 0 Thru 0 Right 7 Out TotalIn 5 7 12 Left 5 Thru 0 Right 1 TotalOut In 21 6 27 Peak Hour Begins at 08:00 AM Cars + Trucks Peak Hour Data North File Name : Simpsonville(03 - W. College Street and Main Street (DC) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Main Street Southbound College Street Westbound Main Street Northbound College Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 04:00 PM 1 0 4 5 0 0 1 1 1 0 3 4 0 0 2 2 12 04:15 PM 0 0 4 4 2 0 2 4 0 0 3 3 0 0 0 0 11 04:30 PM 5 0 7 12 4 0 2 6 1 0 4 5 0 0 1 1 24 04:45 PM 2 0 6 8 6 0 0 6 2 0 0 2 0 0 0 0 16 Total 8 0 21 29 12 0 5 17 4 0 10 14 0 0 3 3 63 05:00 PM 0 0 8 8 2 0 2 4 1 0 0 1 2 0 0 2 15 05:15 PM 7 0 7 14 3 0 0 3 0 0 2 2 1 0 1 2 21 05:30 PM 5 0 3 8 5 0 1 6 1 0 1 2 0 0 0 0 16 05:45 PM 2 0 0 2 4 0 0 4 4 0 3 7 0 0 0 0 13 Total 14 0 18 32 14 0 3 17 6 0 6 12 3 0 1 4 65 Grand Total 22 0 39 61 26 0 8 34 10 0 16 26 3 0 4 7 128 Apprch % 36.1 0 63.9 76.5 0 23.5 38.5 0 61.5 42.9 0 57.1 Total % 17.2 0 30.5 47.7 20.3 0 6.2 26.6 7.8 0 12.5 20.3 2.3 0 3.1 5.5 Cars + 21 0 39 60 26 0 8 34 10 0 16 26 3 0 4 7 127 % Cars + 95.5 0 100 98.4 100 0 100 100 100 0 100 100 100 0 100 100 99.2 Trucks 1 0 0 1 0 0 0 0 0 0 0 0 0 0 0 0 1 % Trucks 4.5 0 0 1.6 0 0 0 0 0 0 0 0 0 0 0 0 0.8 File Name : Simpsonville(03 - W. College Street and Main Street (DC) Site Code : Start Date : 9/24/2025 Page No : 2 Main Street Southbound College Street Westbound Main Street Northbound College Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 04:30 PM 04:30 PM 5 0 7 12 4 0 2 6 1 0 4 5 0 0 1 1 24 04:45 PM 2 0 6 8 6 0 0 6 2 0 0 2 0 0 0 0 16 05:00 PM 0 0 8 8 2 0 2 4 1 0 0 1 2 0 0 2 15 05:15 PM 7 0 7 14 3 0 0 3 0 0 2 2 1 0 1 2 21 Total Volume 14 0 28 42 15 0 4 19 4 0 6 10 3 0 2 5 76 % App. Total 33.3 0 66.7 78.9 0 21.1 40 0 60 60 0 40 PHF .500 .000 .875 .750 .625 .000 .500 .792 .500 .000 .375 .500 .375 .000 .500 .625 .792 Main Street College Street College Street Main Street Right 28 Thru 0 Left 14 InOut Total 7 42 49 Right 4 Thru 0 Left 15 OutTotal In 20 19 39 Left 4 Thru 0 Right 6 Out TotalIn 17 10 27 Left 3 Thru 0 Right 2 TotalOut In 32 5 37 Peak Hour Begins at 04:30 PM Cars + Trucks Peak Hour Data North File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Main Street Southbound Curtis Street Westbound Main Street Northbound Curtis Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 07:00 AM 0 0 0 0 0 0 0 0 1 0 0 1 0 0 1 1 2 07:15 AM 0 0 3 3 1 0 0 1 4 0 0 4 0 0 0 0 8 07:30 AM 0 0 0 0 0 0 1 1 4 0 4 8 0 0 0 0 9 07:45 AM 2 0 5 7 1 0 1 2 5 0 1 6 1 0 2 3 18 Total 2 0 8 10 2 0 2 4 14 0 5 19 1 0 3 4 37 08:00 AM 0 0 5 5 4 0 0 4 2 0 3 5 0 0 4 4 18 08:15 AM 0 0 2 2 2 0 1 3 2 0 0 2 0 0 1 1 8 08:30 AM 0 0 6 6 3 0 2 5 2 0 0 2 1 0 4 5 18 08:45 AM 1 0 3 4 4 0 5 9 8 0 9 17 0 0 2 2 32 Total 1 0 16 17 13 0 8 21 14 0 12 26 1 0 11 12 76 Grand Total 3 0 24 27 15 0 10 25 28 0 17 45 2 0 14 16 113 Apprch % 11.1 0 88.9 60 0 40 62.2 0 37.8 12.5 0 87.5 Total % 2.7 0 21.2 23.9 13.3 0 8.8 22.1 24.8 0 15 39.8 1.8 0 12.4 14.2 Cars + 3 0 23 26 15 0 10 25 28 0 17 45 2 0 14 16 112 % Cars + 100 0 95.8 96.3 100 0 100 100 100 0 100 100 100 0 100 100 99.1 Trucks 0 0 1 1 0 0 0 0 0 0 0 0 0 0 0 0 1 % Trucks 0 0 4.2 3.7 0 0 0 0 0 0 0 0 0 0 0 0 0.9 File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1) Site Code : Start Date : 9/24/2025 Page No : 2 Main Street Southbound Curtis Street Westbound Main Street Northbound Curtis Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 AM 08:00 AM 0 0 5 5 4 0 0 4 2 0 3 5 0 0 4 4 18 08:15 AM 0 0 2 2 2 0 1 3 2 0 0 2 0 0 1 1 8 08:30 AM 0 0 6 6 3 0 2 5 2 0 0 2 1 0 4 5 18 08:45 AM 1 0 3 4 4 0 5 9 8 0 9 17 0 0 2 2 32 Total Volume 1 0 16 17 13 0 8 21 14 0 12 26 1 0 11 12 76 % App. Total 5.9 0 94.1 61.9 0 38.1 53.8 0 46.2 8.3 0 91.7 PHF .250 .000 .667 .708 .813 .000 .400 .583 .438 .000 .333 .382 .250 .000 .688 .600 .594 Main Street Curtis Street Curtis Street Main Street Right 16 Thru 0 Left 1 InOut Total 9 17 26 Right 8 Thru 0 Left 13 OutTotal In 13 21 34 Left 14 Thru 0 Right 12 Out TotalIn 24 26 50 Left 1 Thru 0 Right 11 TotalOut In 30 12 42 Peak Hour Begins at 08:00 AM Cars + Trucks Peak Hour Data North File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Main Street Southbound Curtis Street Westbound Main Street Northbound Curtis Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total 04:00 PM 1 0 7 8 5 0 2 7 6 0 3 9 1 0 1 2 26 04:15 PM 1 0 9 10 8 0 1 9 6 0 4 10 0 0 0 0 29 04:30 PM 4 0 5 9 9 0 3 12 1 0 3 4 0 0 1 1 26 04:45 PM 2 0 5 7 11 0 4 15 1 0 5 6 2 0 5 7 35 Total 8 0 26 34 33 0 10 43 14 0 15 29 3 0 7 10 116 05:00 PM 2 0 3 5 6 0 2 8 2 0 5 7 0 0 2 2 22 05:15 PM 0 0 10 10 6 0 4 10 1 0 4 5 3 0 0 3 28 05:30 PM 6 0 9 15 9 0 2 11 1 0 3 4 1 0 0 1 31 05:45 PM 3 0 7 10 10 0 2 12 5 0 11 16 0 0 0 0 38 Total 11 0 29 40 31 0 10 41 9 0 23 32 4 0 2 6 119 Grand Total 19 0 55 74 64 0 20 84 23 0 38 61 7 0 9 16 235 Apprch % 25.7 0 74.3 76.2 0 23.8 37.7 0 62.3 43.8 0 56.2 Total % 8.1 0 23.4 31.5 27.2 0 8.5 35.7 9.8 0 16.2 26 3 0 3.8 6.8 Cars + 19 0 55 74 64 0 20 84 23 0 38 61 7 0 8 15 234 % Cars + 100 0 100 100 100 0 100 100 100 0 100 100 100 0 88.9 93.8 99.6 Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 1 1 1 % Trucks 0 0 0 0 0 0 0 0 0 0 0 0 0 0 11.1 6.2 0.4 File Name : Simpsonville(04 - W. Curtis Street and N. Main Street (DC) (1) Site Code : Start Date : 9/24/2025 Page No : 2 Main Street Southbound Curtis Street Westbound Main Street Northbound Curtis Street Eastbound Start Time Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Left Thru Right App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 2 0 3 5 6 0 2 8 2 0 5 7 0 0 2 2 22 05:15 PM 0 0 10 10 6 0 4 10 1 0 4 5 3 0 0 3 28 05:30 PM 6 0 9 15 9 0 2 11 1 0 3 4 1 0 0 1 31 05:45 PM 3 0 7 10 10 0 2 12 5 0 11 16 0 0 0 0 38 Total Volume 11 0 29 40 31 0 10 41 9 0 23 32 4 0 2 6 119 % App. Total 27.5 0 72.5 75.6 0 24.4 28.1 0 71.9 66.7 0 33.3 PHF .458 .000 .725 .667 .775 .000 .625 .854 .450 .000 .523 .500 .333 .000 .250 .500 .783 Main Street Curtis Street Curtis Street Main Street Right 29 Thru 0 Left 11 InOut Total 14 40 54 Right 10 Thru 0 Left 31 OutTotal In 34 41 75 Left 9 Thru 0 Right 23 Out TotalIn 33 32 65 Left 4 Thru 0 Right 2 TotalOut In 38 6 44 Peak Hour Begins at 05:00 PM Cars + Trucks Peak Hour Data North File Name : Simpsonville(05 - College St and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Commercial Access Southbound College Street Westbound Hedge Street Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 07:00 AM 0 0 0 0 0 6 117 0 0 123 4 0 5 1 10 0 22 6 0 28 161 07:15 AM 0 0 0 0 0 9 130 0 0 139 2 0 8 0 10 1 34 10 0 45 194 07:30 AM 0 0 0 0 0 9 129 0 0 138 0 0 10 1 11 0 31 16 0 47 196 07:45 AM 0 0 0 0 0 19 116 0 0 135 4 0 18 0 22 0 35 10 0 45 202 Total 0 0 0 0 0 43 492 0 0 535 10 0 41 2 53 1 122 42 0 165 753 08:00 AM 0 0 0 0 0 27 107 0 0 134 6 0 16 0 22 0 48 8 0 56 212 08:15 AM 0 0 0 0 0 62 90 0 0 152 2 0 10 0 12 1 39 13 0 53 217 08:30 AM 0 0 0 0 0 18 82 0 0 100 6 0 19 0 25 0 35 10 0 45 170 08:45 AM 0 0 0 0 0 10 83 0 0 93 7 1 11 0 19 1 29 19 0 49 161 Total 0 0 0 0 0 117 362 0 0 479 21 1 56 0 78 2 151 50 0 203 760 Grand Total 0 0 0 0 0 160 854 0 0 1014 31 1 97 2 131 3 273 92 0 368 1513 Apprch % 0 0 0 0 15.8 84.2 0 0 23.7 0.8 74 1.5 0.8 74.2 25 0 Total % 0 0 0 0 0 10.6 56.4 0 0 67 2 0.1 6.4 0.1 8.7 0.2 18 6.1 0 24.3 Cars + 0 0 0 0 0 160 846 0 0 1006 31 1 97 2 131 3 266 92 0 361 1498 % Cars + 0 0 0 0 0 100 99.1 0 0 99.2 100 100 100 100 100 100 97.4 100 0 98.1 99 Trucks 0 0 0 0 0 0 8 0 0 8 0 0 0 0 0 0 7 0 0 7 15 % Trucks 0 0 0 0 0 0 0.9 0 0 0.8 0 0 0 0 0 0 2.6 0 0 1.9 1 File Name : Simpsonville(05 - College St and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 2 Commercial Access Southbound College Street Westbound Hedge Street Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:30 AM 07:30 AM 0 0 0 0 0 9 129 0 0 138 0 0 10 1 11 0 31 16 0 47 196 07:45 AM 0 0 0 0 0 19 116 0 0 135 4 0 18 0 22 0 35 10 0 45 202 08:00 AM 0 0 0 0 0 27 107 0 0 134 6 0 16 0 22 0 48 8 0 56 212 08:15 AM 0 0 0 0 0 62 90 0 0 152 2 0 10 0 12 1 39 13 0 53 217 Total Volume 0 0 0 0 0 117 442 0 0 559 12 0 54 1 67 1 153 47 0 201 827 % App. Total 0 0 0 0 20.9 79.1 0 0 17.9 0 80.6 1.5 0.5 76.1 23.4 0 PHF .000 .000 .000 .000 .000 .472 .857 .000 .000 .919 .500 .000 .750 .250 .761 .250 .797 .734 .000 .897 .953 Cars + 0 0 0 0 0 117 437 0 0 554 12 0 54 1 67 1 150 47 0 198 819 % Cars + 0 0 0 0 0 100 98.9 0 0 99.1 100 0 100 100 100 100 98.0 100 0 98.5 99.0 Trucks 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 3 0 0 3 8 % Trucks 0 0 0 0 0 0 1.1 0 0 0.9 0 0 0 0 0 0 2.0 0 0 1.5 1.0 Commercial Access College Street College Street Hedge Street Right 0 0 0 Thru 0 0 0 Left 0 0 0 Peds 0 0 0 InOut Total 1 0 1 0 0 0 1 1 0 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 0 0 0 Thru 437 5 442 Left 117 0 117 Peds 0 0 0 OutTotal In 204 554 758 3 5 8 207 766 559 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 12 0 12 Thru 0 0 0 Right 54 0 54 Peds 1 0 1 Out TotalIn 164 67 231 0 0 0 164 231 67 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 1 0 1 Thru 150 3 153 Right 47 0 47 Peds 0 0 0 TotalOut In 449 198 647 5 3 8 454 655 201 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 07:30 AM Cars + Trucks Peak Hour Data North File Name : Simpsonville(05 - College St and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Commercial Access Southbound College Street Westbound Hedge Street Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 04:00 PM 0 0 1 0 1 10 54 0 0 64 12 0 24 0 36 0 69 31 0 100 201 04:15 PM 0 0 1 0 1 16 80 0 0 96 5 0 14 0 19 1 60 34 0 95 211 04:30 PM 0 0 0 0 0 9 67 0 0 76 1 0 9 0 10 0 69 18 0 87 173 04:45 PM 0 0 0 0 0 17 73 0 0 90 3 0 15 0 18 1 67 23 0 91 199 Total 0 0 2 0 2 52 274 0 0 326 21 0 62 0 83 2 265 106 0 373 784 05:00 PM 0 0 3 0 3 8 77 0 0 85 0 0 19 0 19 0 70 28 0 98 205 05:15 PM 0 0 0 2 2 14 59 0 0 73 7 0 13 0 20 1 74 31 0 106 201 05:30 PM 0 0 1 0 1 11 74 0 0 85 1 0 16 0 17 1 78 35 0 114 217 05:45 PM 0 0 2 0 2 11 58 3 0 72 1 0 8 0 9 0 109 39 0 148 231 Total 0 0 6 2 8 44 268 3 0 315 9 0 56 0 65 2 331 133 0 466 854 Grand Total 0 0 8 2 10 96 542 3 0 641 30 0 118 0 148 4 596 239 0 839 1638 Apprch % 0 0 80 20 15 84.6 0.5 0 20.3 0 79.7 0 0.5 71 28.5 0 Total % 0 0 0.5 0.1 0.6 5.9 33.1 0.2 0 39.1 1.8 0 7.2 0 9 0.2 36.4 14.6 0 51.2 Cars + 0 0 8 2 10 96 538 3 0 637 30 0 118 0 148 4 595 238 0 837 1632 % Cars + 0 0 100 100 100 100 99.3 100 0 99.4 100 0 100 0 100 100 99.8 99.6 0 99.8 99.6 Trucks 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 1 0 2 6 % Trucks 0 0 0 0 0 0 0.7 0 0 0.6 0 0 0 0 0 0 0.2 0.4 0 0.2 0.4 File Name : Simpsonville(05 - College St and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 2 Commercial Access Southbound College Street Westbound Hedge Street Northbound College Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 0 0 3 0 3 8 77 0 0 85 0 0 19 0 19 0 70 28 0 98 205 05:15 PM 0 0 0 2 2 14 59 0 0 73 7 0 13 0 20 1 74 31 0 106 201 05:30 PM 0 0 1 0 1 11 74 0 0 85 1 0 16 0 17 1 78 35 0 114 217 05:45 PM 0 0 2 0 2 11 58 3 0 72 1 0 8 0 9 0 109 39 0 148 231 Total Volume 0 0 6 2 8 44 268 3 0 315 9 0 56 0 65 2 331 133 0 466 854 % App. Total 0 0 75 25 14 85.1 1 0 13.8 0 86.2 0 0.4 71 28.5 0 PHF .000 .000 .500 .250 .667 .786 .870 .250 .000 .926 .321 .000 .737 .000 .813 .500 .759 .853 .000 .787 .924 Cars + 0 0 6 2 8 44 266 3 0 313 9 0 56 0 65 2 331 133 0 466 852 % Cars + 0 0 100 100 100 100 99.3 100 0 99.4 100 0 100 0 100 100 100 100 0 100 99.8 Trucks 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 0 0 0 0 2 % Trucks 0 0 0 0 0 0 0.7 0 0 0.6 0 0 0 0 0 0 0 0 0 0 0.2 Commercial Access College Street College Street Hedge Street Right 6 0 6 Thru 0 0 0 Left 0 0 0 Peds 2 0 2 InOut Total 5 8 13 0 0 0 5 13 8 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 3 0 3 Thru 266 2 268 Left 44 0 44 Peds 0 0 0 OutTotal In 387 313 700 0 2 2 387 702 315 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 9 0 9 Thru 0 0 0 Right 56 0 56 Peds 0 0 0 Out TotalIn 177 65 242 0 0 0 177 242 65 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 2 0 2 Thru 331 0 331 Right 133 0 133 Peds 0 0 0 TotalOut In 281 466 747 2 0 2 283 749 466 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 05:00 PM Cars + Trucks Peak Hour Data North File Name : Simpsonville(06 - Curtis Street and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Hedge Street Southbound Curtis Street Westbound Hedge Street Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 07:00 AM 5 5 1 0 11 2 121 3 0 126 0 5 14 0 19 1 83 0 0 84 240 07:15 AM 9 6 1 0 16 4 119 1 0 124 0 9 18 0 27 1 81 1 0 83 250 07:30 AM 10 11 0 1 22 12 103 4 0 119 0 12 25 0 37 0 96 1 0 97 275 07:45 AM 14 25 2 0 41 14 109 5 0 128 2 17 30 0 49 2 70 3 0 75 293 Total 38 47 4 1 90 32 452 13 0 497 2 43 87 0 132 4 330 5 0 339 1058 08:00 AM 6 29 1 0 36 16 100 2 1 119 1 21 32 0 54 1 90 1 0 92 301 08:15 AM 7 66 1 0 74 24 91 3 1 119 0 10 25 0 35 0 87 0 0 87 315 08:30 AM 8 25 0 0 33 18 97 2 0 117 4 25 42 0 71 1 72 0 1 74 295 08:45 AM 7 13 4 0 24 16 79 2 0 97 5 19 29 0 53 4 67 1 0 72 246 Total 28 133 6 0 167 74 367 9 2 452 10 75 128 0 213 6 316 2 1 325 1157 Grand Total 66 180 10 1 257 106 819 22 2 949 12 118 215 0 345 10 646 7 1 664 2215 Apprch % 25.7 70 3.9 0.4 11.2 86.3 2.3 0.2 3.5 34.2 62.3 0 1.5 97.3 1.1 0.2 Total % 3 8.1 0.5 0 11.6 4.8 37 1 0.1 42.8 0.5 5.3 9.7 0 15.6 0.5 29.2 0.3 0 30 Cars + 66 180 10 1 257 106 784 22 1 913 11 118 211 0 340 10 617 7 1 635 2145 % Cars + 100 100 100 100 100 100 95.7 100 50 96.2 91.7 100 98.1 0 98.6 100 95.5 100 100 95.6 96.8 Trucks 0 0 0 0 0 0 35 0 1 36 1 0 4 0 5 0 29 0 0 29 70 % Trucks 0 0 0 0 0 0 4.3 0 50 3.8 8.3 0 1.9 0 1.4 0 4.5 0 0 4.4 3.2 File Name : Simpsonville(06 - Curtis Street and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 2 Hedge Street Southbound Curtis Street Westbound Hedge Street Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 AM to 08:45 AM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 AM 07:45 AM 14 25 2 0 41 14 109 5 0 128 2 17 30 0 49 2 70 3 0 75 293 08:00 AM 6 29 1 0 36 16 100 2 1 119 1 21 32 0 54 1 90 1 0 92 301 08:15 AM 7 66 1 0 74 24 91 3 1 119 0 10 25 0 35 0 87 0 0 87 315 08:30 AM 8 25 0 0 33 18 97 2 0 117 4 25 42 0 71 1 72 0 1 74 295 Total Volume 35 145 4 0 184 72 397 12 2 483 7 73 129 0 209 4 319 4 1 328 1204 % App. Total 19 78.8 2.2 0 14.9 82.2 2.5 0.4 3.3 34.9 61.7 0 1.2 97.3 1.2 0.3 PHF .625 .549 .500 .000 .622 .750 .911 .600 .500 .943 .438 .730 .768 .000 .736 .500 .886 .333 .250 .891 .956 Cars + 35 145 4 0 184 72 376 12 1 461 7 73 126 0 206 4 300 4 1 309 1160 % Cars + 100 100 100 0 100 100 94.7 100 50.0 95.4 100 100 97.7 0 98.6 100 94.0 100 100 94.2 96.3 Trucks 0 0 0 0 0 0 21 0 1 22 0 0 3 0 3 0 19 0 0 19 44 % Trucks 0 0 0 0 0 0 5.3 0 50.0 4.6 0 0 2.3 0 1.4 0 6.0 0 0 5.8 3.7 Hedge Street Curtis Street Curtis Street Hedge Street Right 4 0 4 Thru 145 0 145 Left 35 0 35 Peds 0 0 0 InOut Total 89 184 273 0 0 0 89 273 184 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 12 0 12 Thru 376 21 397 Left 72 0 72 Peds 1 1 2 OutTotal In 461 461 922 22 22 44 483 966 483 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 7 0 7 Thru 73 0 73 Right 126 3 129 Peds 0 0 0 Out TotalIn 221 206 427 0 3 3 221 430 209 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 4 0 4 Thru 300 19 319 Right 4 0 4 Peds 1 0 1 TotalOut In 387 309 696 21 19 40 408 736 328 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 07:45 AM Cars + Trucks Peak Hour Data North File Name : Simpsonville(06 - Curtis Street and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 1 Groups Printed- Cars + - Trucks Hedge Street Southbound Curtis Street Westbound Hedge Street Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total 04:00 PM 23 12 0 0 35 10 65 3 0 78 0 23 44 0 67 2 113 2 0 117 297 04:15 PM 41 16 0 0 57 15 70 2 0 87 2 15 34 0 51 4 122 5 0 131 326 04:30 PM 16 12 2 0 30 14 70 1 0 85 3 10 50 1 64 1 134 2 0 137 316 04:45 PM 22 16 3 0 41 11 55 1 0 67 2 16 45 0 63 4 104 4 0 112 283 Total 102 56 5 0 163 50 260 7 0 317 7 64 173 1 245 11 473 13 0 497 1222 05:00 PM 26 12 1 0 39 21 75 1 0 97 1 13 47 0 61 2 127 4 4 137 334 05:15 PM 32 21 1 2 56 14 66 5 0 85 2 22 60 1 85 4 145 1 2 152 378 05:30 PM 29 13 1 0 43 21 64 1 0 86 0 23 52 0 75 3 143 6 0 152 356 05:45 PM 20 21 3 0 44 19 70 4 0 93 2 20 50 0 72 7 127 0 2 136 345 Total 107 67 6 2 182 75 275 11 0 361 5 78 209 1 293 16 542 11 8 577 1413 Grand Total 209 123 11 2 345 125 535 18 0 678 12 142 382 2 538 27 1015 24 8 1074 2635 Apprch % 60.6 35.7 3.2 0.6 18.4 78.9 2.7 0 2.2 26.4 71 0.4 2.5 94.5 2.2 0.7 Total % 7.9 4.7 0.4 0.1 13.1 4.7 20.3 0.7 0 25.7 0.5 5.4 14.5 0.1 20.4 1 38.5 0.9 0.3 40.8 Cars + 209 123 11 2 345 125 521 18 0 664 12 142 379 0 533 27 999 24 8 1058 2600 % Cars + 100 100 100 100 100 100 97.4 100 0 97.9 100 100 99.2 0 99.1 100 98.4 100 100 98.5 98.7 Trucks 0 0 0 0 0 0 14 0 0 14 0 0 3 2 5 0 16 0 0 16 35 % Trucks 0 0 0 0 0 0 2.6 0 0 2.1 0 0 0.8 100 0.9 0 1.6 0 0 1.5 1.3 File Name : Simpsonville(06 - Curtis Street and Hedge Street) Site Code : Start Date : 9/24/2025 Page No : 2 Hedge Street Southbound Curtis Street Westbound Hedge Street Northbound Curtis Street Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 04:00 PM to 05:45 PM - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 05:00 PM 05:00 PM 26 12 1 0 39 21 75 1 0 97 1 13 47 0 61 2 127 4 4 137 334 05:15 PM 32 21 1 2 56 14 66 5 0 85 2 22 60 1 85 4 145 1 2 152 378 05:30 PM 29 13 1 0 43 21 64 1 0 86 0 23 52 0 75 3 143 6 0 152 356 05:45 PM 20 21 3 0 44 19 70 4 0 93 2 20 50 0 72 7 127 0 2 136 345 Total Volume 107 67 6 2 182 75 275 11 0 361 5 78 209 1 293 16 542 11 8 577 1413 % App. Total 58.8 36.8 3.3 1.1 20.8 76.2 3 0 1.7 26.6 71.3 0.3 2.8 93.9 1.9 1.4 PHF .836 .798 .500 .250 .813 .893 .917 .550 .000 .930 .625 .848 .871 .250 .862 .571 .934 .458 .500 .949 .935 Cars + 107 67 6 2 182 75 266 11 0 352 5 78 208 0 291 16 535 11 8 570 1395 % Cars + 100 100 100 100 100 100 96.7 100 0 97.5 100 100 99.5 0 99.3 100 98.7 100 100 98.8 98.7 Trucks 0 0 0 0 0 0 9 0 0 9 0 0 1 1 2 0 7 0 0 7 18 % Trucks 0 0 0 0 0 0 3.3 0 0 2.5 0 0 0.5 100 0.7 0 1.3 0 0 1.2 1.3 Hedge Street Curtis Street Curtis Street Hedge Street Right 6 0 6 Thru 67 0 67 Left 107 0 107 Peds 2 0 2 InOut Total 105 182 287 0 0 0 105 287 182 Out 0 0 0 In 0 0 0 Total 0 0 0 Right 11 0 11 Thru 266 9 275 Left 75 0 75 Peds 0 0 0 OutTotal In 850 352 1202 8 9 17 858 1219 361 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 5 0 5 Thru 78 0 78 Right 208 1 209 Peds 0 1 1 Out TotalIn 153 291 444 0 2 2 153 446 293 Out 0 0 0 In 0 0 0 Total 0 0 0 Left 16 0 16 Thru 535 7 542 Right 11 0 11 Peds 8 0 8 TotalOut In 277 570 847 9 7 16 286 863 577 Out0 0 0 In 0 0 0 Total0 0 0 Peak Hour Begins at 05:00 PM Cars + Trucks Peak Hour Data North APPENDIX B TURN LANE ANALYSIS /0/1/2/3/4/i255/6/7/8/9/i255/10 /11/12/13/14/15/13/16/12/10/17/11/15/i255/18 /19/20/21/18/i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /23/24/25/26/27/28/29/26/30 /31/24/25/32/i255 /i255 /33/34/i255/35/36/37/i255/38/39/40/30/41/42/i255/31/38/i255/29/28/27/43/37/25/i255/27/37/44/27/37/25/37/24/26/25/i255/26/36/37/i255/44/37/27/29/37/24/26/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/i255/30/24/i255/26/36/37/i255/39/45/43/39/24/29/30/24/46/i255/43/31/41/28/40/37/i255/47/48/49/50/34/i255 /35/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/29/28/27/43/37/i255/38/31/27/i255/26/36/37/i255/39/29/26/28/39/41/i255/44/37/27/29/37/24/26/39/46/37/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/34/i255/i255/51/36/37/24/i255/26/36/30/25/i255/30/25/i255 /24/31/26/i255/39/24/i255/37/43/37/24/i255/30/24/29/27/37/40/37/24/26/i255/31/38/i255/52/53/i255/26/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/37/25/26/30/40/39/26/37/i255/54/36/37/27/37/i255/26/36/37/i255/29/28/27/43/37/i255/41/30/37/25/34/i255 /55/34/i255/56/37/39/45/i255/48/49/i255/39/24/45/i255/48/57/i255/30/24/26/31/i255/26/36/37/i255/29/36/39/27/26/i255/39/24/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/30/24/26/37/27/25/37/29/26/30/31/24/i255/31/38/i255/26/36/37/i255/26/54/31/i255/43/31/41/28/40/37/25/34/i255 /58/34/i255/59/31/26/37/i255/26/36/37/i255/41/31/29/39/26/30/31/24/i255/31/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/24/i255/60/55/i255/27/37/41/39/26/30/43/37/i255/26/31/i255/26/36/37/i255/41/30/24/37/i255/30/24/i255/60/33/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/27/30/46/36/26/i255/31/38/i255 /26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61/26/28/27/24/i255/41/39/24/37/i255/30/25/i255/54/39/27/27/39/24/26/37/45/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/41/37/38/26/i255/31/38/i255/26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61 /26/28/27/24/i255/41/39/24/37/i255/30/25/i255/24/31/26/i255/54/39/27/27/39/24/26/37/45/i255/62/39/25/37/45/i255/31/24/i255/26/27/39/38/38/30/29/i255/43/31/41/28/40/37/25/34/i255 /i255 /i255 /i255 /i255 /63/64/65/66/67/68/i255/70/66/71/72/68/65/71/73/68/74/i255/75/64/76/i255/65/68/75/77/78/77/66/76/73/i255/65/79/73/68/74/i255/79/77/i255/66/73/74/71/70/73/79/65/71/80/68/72/i255 /71/73/77/68/76/74/68/81/77/71/64/73/74/i255/64/73/i255/77/82/64 /78/65/79/73/68/i255/83/71/70/83/82/79/84/74/i255/85/86/87/i255/88/89/90/91/i255 /75/92/93/94/95/96/i255/97/98/99/78/70/i255 /0/1/2/3/4/i255/6/7/8/9/i255/10 /11/12/13/14/15/13/16/12/10/17/11/15/i255/18 /19/20/21/18/i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /23/24/25/26/27/28/29/26/30 /31/24/25/32/i255 /i255 /33/34/i255/35/36/37/i255/38/39/40/30/41/42/i255/31/38/i255/29/28/27/43/37/25/i255/27/37/44/27/37/25/37/24/26/25/i255/26/36/37/i255/44/37/27/29/37/24/26/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/i255/30/24/i255/26/36/37/i255/39/45/43/39/24/29/30/24/46/i255/43/31/41/28/40/37/i255/47/48/49/50/34/i255 /35/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/29/28/27/43/37/i255/38/31/27/i255/26/36/37/i255/39/29/26/28/39/41/i255/44/37/27/29/37/24/26/39/46/37/i255/31/38/i255/41/37/38/26/i255/26/28/27/24/25/34/i255/i255/51/36/37/24/i255/26/36/30/25/i255/30/25/i255 /24/31/26/i255/39/24/i255/37/43/37/24/i255/30/24/29/27/37/40/37/24/26/i255/31/38/i255/52/53/i255/26/36/37/i255/45/37/25/30/46/24/37/27/i255/25/36/31/28/41/45/i255/37/25/26/30/40/39/26/37/i255/54/36/37/27/37/i255/26/36/37/i255/29/28/27/43/37/i255/41/30/37/25/34/i255 /55/34/i255/56/37/39/45/i255/48/49/i255/39/24/45/i255/48/57/i255/30/24/26/31/i255/26/36/37/i255/29/36/39/27/26/i255/39/24/45/i255/41/31/29/39/26/37/i255/26/36/37/i255/30/24/26/37/27/25/37/29/26/30/31/24/i255/31/38/i255/26/36/37/i255/26/54/31/i255/43/31/41/28/40/37/25/34/i255 /58/34/i255/59/31/26/37/i255/26/36/37/i255/41/31/29/39/26/30/31/24/i255/31/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/24/i255/60/55/i255/27/37/41/39/26/30/43/37/i255/26/31/i255/26/36/37/i255/41/30/24/37/i255/30/24/i255/60/33/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/27/30/46/36/26/i255/31/38/i255 /26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61/26/28/27/24/i255/41/39/24/37/i255/30/25/i255/54/39/27/27/39/24/26/37/45/34/i255/i255/23/38/i255/26/36/37/i255/44/31/30/24/26/i255/30/25/i255/26/31/i255/26/36/37/i255/41/37/38/26/i255/31/38/i255/26/36/37/i255/41/30/24/37/53/i255/26/36/37/24/i255/39/i255/41/37/38/26/61 /26/28/27/24/i255/41/39/24/37/i255/30/25/i255/24/31/26/i255/54/39/27/27/39/24/26/37/45/i255/62/39/25/37/45/i255/31/24/i255/26/27/39/38/38/30/29/i255/43/31/41/28/40/37/25/34/i255 /i255 /i255 /i255 /i255 /63/64/65/66/67/68/i255/70/66/71/72/68/65/71/73/68/74/i255/75/64/76/i255/65/68/75/77/78/77/66/76/73/i255/65/79/73/68/74/i255/79/77/i255/66/73/74/71/70/73/79/65/71/80/68/72/i255 /71/73/77/68/76/74/68/81/77/71/64/73/74/i255/64/73/i255/77/82/64 /78/65/79/73/68/i255/83/71/70/83/82/79/84/74/i255/85/86/87/i255/88/89/90/91/i255 /75/92/93/94/95/96/i255/97/98/99/78/70/i255 /0/1/2/3/4/i255/6 /7/8/9/10/11/9/12/8/6/13/7/11/i255/14 /15 /16/17/18/i255/4/19/20/21/i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /i255 /23/24/25/26/27/i255/28 /24/29/i255/30/31/32/30/33/34/35/36/i255/33/31/25/30/i255/34/i255/37/26/36/31/32/38/i255/36/39/26/26/37/i255/40/26/41/24/33/i255/42/43/i255/44/31/41/26/36/i255/39/26/29/i255/30/24/45/29/i255/33/31/25/30/i255/34/i255/46/47/48/i255/49/i255/50/43/43/i255/34/38/37/i255/33/30/26/29/26/i255 /29/31/32/30/25/i255/25/45/29/38/36/i255/51/i255/52/43/53/i255/34/38/i255/34/37/54/45/36/25/44/26/38/25/i255/36/30/24/45/41/37/i255/40/26/i255/45/36/26/37/55/i255/i255/56/24/i255/29/26/34/37/i255/25/30/26/i255/57/26/29/25/31/58/34/41/i255/34/59/31/36/i255/24/60/i255/25/30/26/i255/58/30/34/29/25/53/i255 /36/45/40/25/29/34/58/25/i255/61/43/i255/60/29/24/44/i255/25/30/26/i255/34/58/25/45/34/41/i255/38/45/44/40/26/29/i255/24/60/i255/29/31/32/30/25/i255/25/45/29/38/36/55/i255 /i255 /i255 /62/63/64/65/66/67/68/i255 /70/71/72/73/74/75/i255 /76/73/77/71/78/74/i255/11/79/73/73/80/i255/i255/81/i255/82/2/i255/83/71/84/73/77/i255/79/73/16/i255/18/85/86/16/i255 /i255 /76/87/88/i255 /i255/i255/81/i255/4/2/19/i255/72/73/18/71/17/84/73/77/i255/79/73/16/i255/18/85/86/16/i255 /i255 /10/71/78/18/89/i255/8/86/16/74/77/i255/i255 /81/i255/20/19/19/i255/72/73/18/71/17/84/73/77/i255/79/73/16/i255/18/85/86/16/i255 /i255 /90/16/85/91/84/73/83/75/i255/i255 /76/73/89/73/16/83/71/74/73/i255/71/92/i255/15/i255/16/71/78/18/89/3/89/86/16/74/i255/84/15/74/73/i255/71/77/i255/74/73/17/73/77/77/15/16/93/1/i255 /11/85/84/86/89/71/85/74/75/i255/8/85/i255/16/73/15/80/i255/89/18/73/i255/72/73/16/89/71/17/15/84/i255/15/94/71/77/95/i255/86/77/73/i255/20/19/19/i255/96/i255/4/19/i255/81/i255/97/19/i255/72/73/18/71/17/84/73/77/i255/79/73/16/i255/18/85/86/16/1/i255/i255/8/18/73/i255/92/71/78/86/16/73/i255 /71/74/80/71/17/15/89/73/77/i255/89/18/15/89/i255/15/i255/16/71/78/18/89/3/89/86/16/74/i255/84/15/74/73/i255/71/77/i255/74/85/89/i255/74/73/17/73/77/77/15/16/93/95/i255/86/74/84/73/77/77/i255/85/89/18/73/16/i255/92/15/17/89/85/16/77/i255/98/73/1/78/1/95/i255/18/71/78/18/i255 /17/16/15/77/18/i255/16/15/89/73/99/i255/71/74/80/71/17/15/89/73/i255/15/i255/84/15/74/73/i255/71/77/i255/74/73/73/80/73/80/1/i255 /i255 /100/101/102/103/62/104/102/105/62/106/i255/107/108/109/i255/109/102/100/110/111/112/111/101/109/105/i255/104/113/105/62/106/i255/113/111/i255/101/105/106/102/100/105/113/104/102/114/62/103/i255/102/105/111/62/109/106/62/115/111/102/108/105/106/i255 /108/105/i255/111/116/108 /112/104/113/105/62/i255/110/102/100/110/116/113/117/106/i255 /107/118/119/120/121/68/i255/122/123/124/112/113/i255 /i255/i255 APPENDIX C SYNCHRO ANALYSIS REPORTS Lanes, Volumes, Timings Existing (2025) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 36 125 12 64 200 196 6 552 16 61 515 19 Future Volume (vph) 36 125 12 64 200 196 6 552 16 61 515 19 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 125 0 125 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.991 0.942 0.996 0.995 Flt Protected 0.990 0.993 0.950 0.950 Satd. Flow (prot) 0 1828 0 0 1742 0 1770 1855 0 1770 1853 0 Flt Permitted 0.791 0.929 0.347 0.169 Satd. Flow (perm) 0 1460 0 0 1630 0 646 1855 0 315 1853 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 4 44 2 2 Link Speed (mph) 25 25 35 35 Link Distance (ft) 82 413 570 1253 Travel Time (s) 2.2 11.3 11.1 24.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 40 139 13 71 222 218 7 613 18 68 572 21 Shared Lane Traffic (%) Lane Group Flow (vph) 0 192 0 0 511 0 7 631 0 68 593 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA pm+pt NA pm+pt NA Protected Phases 4 8 5 2 1 6 P e r m i t t e d P h a s e s 4826 Lanes, Volumes, Timings Existing (2025) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 8 8 5 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 43.0 43.0 43.0 43.0 9.6 47.2 9.8 47.4 Total Split (%) 43.0% 43.0% 43.0% 43.0% 9.6% 47.2% 9.8% 47.4% Maximum Green (s) 38.5 38.5 38.5 38.5 5.1 42.7 5.3 42.9 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lag Lag Lead Lead Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 33.9 33.9 48.7 48.7 55.2 55.2 Actuated g/C Ratio 0.34 0.34 0.49 0.49 0.55 0.55 v/c Ratio 0.39 0.88 0.02 0.70 0.26 0.58 Control Delay (s/veh) 26.0 45.5 14.0 18.4 15.7 19.7 Queue Delay 0.0 0.0 0.0 0.1 0.0 0.0 Total Delay (s/veh) 26.0 45.5 14.0 18.5 15.7 19.7 LOS C D B B B B Approach Delay (s/veh) 26.0 45.5 18.5 19.3 Approach LOS C D B B Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 77 (77%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay (s/veh): 26.4 Intersection LOS: C Intersection Capacity Utilization 76.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: NE Main Street (SC 417) & College Street Lanes, Volumes, Timings Existing (2025) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 25 189 13 51 235 122 22 410 43 118 442 21 Future Volume (vph) 25 189 13 51 235 122 22 410 43 118 442 21 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.992 0.960 0.986 0.993 Flt Protected 0.994 0.994 0.950 0.950 Satd. Flow (prot) 0 1837 0 0 1778 0 1770 1837 0 1770 1850 0 Flt Permitted 0.898 0.918 0.391 0.289 Satd. Flow (perm) 0 1659 0 0 1642 0 728 1837 0 538 1850 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 3 25 6 3 Link Speed (mph) 25 25 35 35 Link Distance (ft) 85 379 1084 570 Travel Time (s) 2.3 10.3 21.1 11.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 28 210 14 57 261 136 24 456 48 131 491 23 Shared Lane Traffic (%) Lane Group Flow (vph) 0 252 0 0 454 0 24 504 0 131 514 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA pm+pt NA pm+pt NA Protected Phases 4 8 5 2 1 6 P e r m i t t e d P h a s e s 4826 Lanes, Volumes, Timings Existing (2025) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 8 8 5 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 42.0 42.0 42.0 42.0 9.6 45.0 13.0 48.4 Total Split (%) 42.0% 42.0% 42.0% 42.0% 9.6% 45.0% 13.0% 48.4% Maximum Green (s) 37.5 37.5 37.5 37.5 5.1 40.5 8.5 43.9 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 31.0 31.0 53.0 47.3 59.6 55.9 Actuated g/C Ratio 0.31 0.31 0.53 0.47 0.60 0.56 v/c Ratio 0.49 0.86 0.05 0.58 0.31 0.50 Control Delay (s/veh) 30.0 29.0 10.7 24.0 5.5 7.0 Queue Delay 0.0 0.6 0.0 0.1 0.0 0.1 Total Delay (s/veh) 30.0 29.5 10.7 24.1 5.5 7.1 L O S C CB CA A Approach Delay (s/veh) 30.0 29.5 23.5 6.8 Approach LOS C C C A Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 80 (80%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.86 Intersection Signal Delay (s/veh): 20.1 Intersection LOS: C Intersection Capacity Utilization 73.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street Lanes, Volumes, Timings Existing (2025) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 153 47 117 442 12 54 Future Volume (vph) 153 47 117 442 12 54 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.968 0.889 Flt Protected 0.990 0.991 Satd. Flow (prot) 1803 0 0 1844 1641 0 Flt Permitted 0.990 0.991 Satd. Flow (perm) 1803 0 0 1844 1641 0 Link Speed (mph) 25 25 25 Link Distance (ft) 413 1158 568 Travel Time (s) 11.3 31.6 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 170 52 130 491 13 60 Shared Lane Traffic (%) Lane Group Flow (vph) 222 0 0 621 73 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 54.6% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Existing (2025) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 6 Intersection Int Delay, s/veh 2.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 153 47 117 442 12 54 Future Vol, veh/h 153 47 117 442 12 54 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 170 52 130 491 13 60 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 222 0 947 196 Stage 1 - - - - 196 - Stage 2 - - - - 751 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1347 - 290 845 Stage 1 - - - - 837 - Stage 2 - - - - 466 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1347 - 251 845 Mov Cap-2 Maneuver - - - - 251 - Stage 1 - - - - 837 - Stage 2 - - - - 404 - Approach EB WB NB HCM Ctrl Dly, s/v 0 1.7 12 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 591 - - 1347 - HCM Lane V/C Ratio 0.124 - - 0.097 - HCM Ctrl Dly (s/v) 12 - - 8 0 HCM Lane LOS B - - A A HCM 95th %tile Q (veh) 0.4 - - 0.3 - Lanes, Volumes, Timings Existing (2025) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 319 4 72 397 12 7 73 129 35 145 4 Future Volume (vph) 4 319 4 72 397 12 7 73 129 35 145 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.997 0.917 0.997 Flt Protected 0.999 0.993 0.998 0.991 Satd. Flow (prot) 0 1859 0 0 1844 0 0 1705 0 0 1840 0 Flt Permitted 0.996 0.890 0.998 0.991 Satd. Flow (perm) 0 1853 0 0 1653 0 0 1705 0 0 1840 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 1 2 72 1 Link Speed (mph) 25 25 25 25 Link Distance (ft) 379 1213 1024 568 Travel Time (s) 10.3 33.1 27.9 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 354 4 80 441 13 8 81 143 39 161 4 Shared Lane Traffic (%) Lane Group Flow (vph) 0 362 0 0 534 0 0 232 0 0 204 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 0 1 1 1 1 Detector Template Left Thru Left Left Left Leading Detector (ft) 20 100 20 0 20 30 20 30 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 30 20 30 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 Detector 2 Size(ft) 6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 Turn Type Perm NA Perm NA Split NA Split NA Protected Phases 2 6 4 4 8 8 Permitted Phases 2 6 Detector Phase 2 2 6 6 4 4 8 8 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Lanes, Volumes, Timings Existing (2025) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 Total Split (s) 52.2 52.2 52.2 52.2 24.2 24.2 23.6 23.6 Total Split (%) 52.2% 52.2% 52.2% 52.2% 24.2% 24.2% 23.6% 23.6% Maximum Green (s) 47.7 47.7 47.7 47.7 19.7 19.7 19.1 19.1 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C-Max C-Max Max Max None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 56.3 56.3 14.6 15.6 Actuated g/C Ratio 0.56 0.56 0.15 0.16 v/c Ratio 0.35 0.57 0.75 0.71 Control Delay (s/veh) 8.3 19.0 42.7 50.8 Queue Delay 0.5 0.1 0.0 0.0 Total Delay (s/veh) 8.8 19.1 42.7 50.8 LOS A B D D Approach Delay (s/veh) 8.8 19.1 42.7 50.8 Approach LOS A B D D Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 6 (6%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.75 Intersection Signal Delay (s/veh): 25.3 Intersection LOS: C Intersection Capacity Utilization 78.4% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 4: Hedge Street & Curtis Street Lanes, Volumes, Timings Existing (2025) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 5 165 1 4 212 9 0 0 7 1 0 21 F u t u r e V o l u m e ( v p h ) 5 1 6 514 2 1 2900710 2 1 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.995 0.865 0.871 Flt Protected 0.998 0.999 0.998 Satd. Flow (prot) 0 1857 0 0 1852 0 0 1611 0 0 1619 0 Flt Permitted 0.998 0.999 0.998 Satd. Flow (perm) 0 1857 0 0 1852 0 0 1611 0 0 1619 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1082 82 565 1260 Travel Time (s) 29.5 2.2 15.4 34.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 6 183 1 4 236 10 0 0 8 1 0 23 Shared Lane Traffic (%) Lane Group Flow (vph) 0 190 0 0 250 0 0 8 0 0 24 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 23.4% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Existing (2025) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 10 Intersection Int Delay, s/veh 0.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 5 1 6 514 2 1 2900710 2 1 F u t u r e V o l , v e h / h 5 1 6 514 2 1 2900710 2 1 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 6 1 8 314 2 3 6 1 000810 2 3 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 246 0 0 184 0 0 457 450 184 449 445 241 Stage 1 - ----- 1 9 6 1 9 6- 2 4 9 2 4 9- Stage 2 - ----- 2 6 1 2 5 4- 2 0 0 1 9 6- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1320 - - 1391 - - 514 504 858 520 508 798 Stage 1 - ----- 8 0 6 7 3 9- 7 5 5 7 0 1- Stage 2 - ----- 7 4 4 6 9 7- 8 0 2 7 3 9- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1320 - - 1391 - - 496 500 858 512 504 798 Mov Cap-2 Maneuver - ----- 4 9 6 5 0 0- 5 1 2 5 0 4- Stage 1 - ----- 8 0 2 7 3 5- 7 5 1 6 9 9- Stage 2 - ----- 7 2 0 6 9 5- 7 9 1 7 3 5- Approach EB WB NB SB HCM Ctrl Dly, s/v 0.2 0.1 9.2 9.8 HCM LOS A A Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 858 1320 - - 1391 - - 778 HCM Lane V/C Ratio 0.009 0.004 - - 0.003 - - 0.031 HCM Ctrl Dly (s/v) 9.2 7.7 0 - 7.6 0 - 9.8 HCM Lane LOS A A A - A A - A HCM 95th %tile Q (veh) 0 0 - - 0 - - 0.1 Lanes, Volumes, Timings Existing (2025) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 1 214 11 13 257 8 14 0 12 1 0 16 Future Volume (vph) 1 214 11 13 257 8 14 0 12 1 0 16 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.994 0.996 0.939 0.872 Flt Protected 0.998 0.973 0.997 Satd. Flow (prot) 0 1852 0 0 1852 0 0 1702 0 0 1619 0 Flt Permitted 0.998 0.973 0.997 Satd. Flow (perm) 0 1852 0 0 1852 0 0 1702 0 0 1619 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1197 85 1027 565 Travel Time (s) 32.6 2.3 28.0 15.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 1 238 12 14 286 9 16 0 13 1 0 18 Shared Lane Traffic (%) Lane Group Flow (vph) 0 251 0 0 309 0 0 29 0 0 19 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 37.0% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Existing (2025) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 12 Intersection Int Delay, s/veh 1.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 1 214 11 13 257 8 14 0 12 1 0 16 Future Vol, veh/h 1 214 11 13 257 8 14 0 12 1 0 16 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 Mvmt Flow 1 238 12 14 286 9 16 0 13 1 0 18 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 295 0 0 250 0 0 574 569 244 572 571 291 Stage 1 - ----- 2 4 6 2 4 6- 3 1 9 3 1 9- Stage 2 - ----- 3 2 8 3 2 3- 2 5 3 2 5 2- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1266 - - 1316 - - 430 432 795 431 431 748 Stage 1 - ----- 7 5 8 7 0 3- 6 9 3 6 5 3- Stage 2 - ----- 6 8 5 6 5 0- 7 5 1 6 9 8- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1266 - - 1316 - - 415 426 795 419 425 748 Mov Cap-2 Maneuver - ----- 4 1 5 4 2 6- 4 1 9 4 2 5- Stage 1 - ----- 7 5 7 7 0 2- 6 9 2 6 4 5- Stage 2 - ----- 6 6 0 6 4 2- 7 3 8 6 9 7- Approach EB WB NB SB HCM Ctrl Dly, s/v 0 0.4 12.2 10.2 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 532 1266 - - 1316 - - 715 HCM Lane V/C Ratio 0.054 0.001 - - 0.011 - - 0.026 HCM Ctrl Dly (s/v) 12.2 7.8 0 - 7.8 0 - 10.2 HCM Lane LOS B A A - A A - B HCM 95th %tile Q (veh) 0.2 0 - - 0 - - 0.1 Lanes, Volumes, Timings Existing (2025) PM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 33 177 27 42 160 103 12 498 72 123 663 22 Future Volume (vph) 33 177 27 42 160 103 12 498 72 123 663 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 125 0 125 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.985 0.955 0.981 0.995 Flt Protected 0.993 0.993 0.950 0.950 Satd. Flow (prot) 0 1822 0 0 1766 0 1770 1827 0 1770 1853 0 Flt Permitted 0.832 0.867 0.262 0.249 Satd. Flow (perm) 0 1527 0 0 1542 0 488 1827 0 464 1853 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 6 26 10 2 Link Speed (mph) 25 25 35 35 Link Distance (ft) 82 413 570 1253 Travel Time (s) 2.2 11.3 11.1 24.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 37 197 30 47 178 114 13 553 80 137 737 24 Shared Lane Traffic (%) Lane Group Flow (vph) 0 264 0 0 339 0 13 633 0 137 761 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA pm+pt NA pm+pt NA Protected Phases 4 8 5 2 1 6 P e r m i t t e d P h a s e s 4826 Lanes, Volumes, Timings Existing (2025) PM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 8 8 5 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 33.0 33.0 33.0 33.0 9.6 53.8 13.2 57.4 Total Split (%) 33.0% 33.0% 33.0% 33.0% 9.6% 53.8% 13.2% 57.4% Maximum Green (s) 28.5 28.5 28.5 28.5 5.1 49.3 8.7 52.9 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 23.8 23.8 60.2 54.8 67.0 65.3 Actuated g/C Ratio 0.24 0.24 0.60 0.55 0.67 0.65 v/c Ratio 0.72 0.88 0.04 0.63 0.33 0.63 Control Delay (s/veh) 45.0 56.8 4.3 9.7 8.9 15.1 Queue Delay 0.0 0.0 0.0 0.2 0.0 0.0 Total Delay (s/veh) 45.0 56.8 4.3 9.9 8.9 15.1 L O S D EA AA B Approach Delay (s/veh) 45.0 56.8 9.8 14.2 Approach LOS D E A B Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 72 (72%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay (s/veh): 23.4 Intersection LOS: C Intersection Capacity Utilization 74.3% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: NE Main Street (SC 417) & College Street Lanes, Volumes, Timings Existing (2025) PM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 16 252 21 30 190 54 44 456 136 191 465 51 Future Volume (vph) 16 252 21 30 190 54 44 456 136 191 465 51 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 150 0 Storage Lanes 0 0 0 0 1 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.990 0.973 0.966 0.985 Flt Protected 0.997 0.995 0.950 0.950 Satd. Flow (prot) 0 1839 0 0 1803 0 1770 1799 0 1770 1835 0 Flt Permitted 0.955 0.841 0.375 0.232 Satd. Flow (perm) 0 1761 0 0 1524 0 699 1799 0 432 1835 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 4 12 21 9 Link Speed (mph) 25 25 35 35 Link Distance (ft) 85 379 1084 570 Travel Time (s) 2.3 10.3 21.1 11.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 18 280 23 33 211 60 49 507 151 212 517 57 Shared Lane Traffic (%) Lane Group Flow (vph) 0 321 0 0 304 0 49 658 0 212 574 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 1 2 1 2 Detector Template Left Thru Left Thru Left Thru Left Thru Leading Detector (ft) 20 100 20 100 20 100 20 100 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 94 Detector 2 Size(ft) 6 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 0.0 Turn Type Perm NA Perm NA pm+pt NA pm+pt NA Protected Phases 4 8 5 2 1 6 P e r m i t t e d P h a s e s 4826 Lanes, Volumes, Timings Existing (2025) PM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 8 8 5 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 5.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 22.5 9.5 22.5 9.5 22.5 Total Split (s) 30.0 30.0 30.0 30.0 9.6 53.0 17.0 60.4 Total Split (%) 30.0% 30.0% 30.0% 30.0% 9.6% 53.0% 17.0% 60.4% Maximum Green (s) 25.5 25.5 25.5 25.5 5.1 48.5 12.5 55.9 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead Lag Lead-Lag Optimize? Yes Yes Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 Act Effct Green (s) 22.0 22.0 60.3 54.7 68.4 60.9 Actuated g/C Ratio 0.22 0.22 0.60 0.55 0.68 0.61 v/c Ratio 0.82 0.88 0.10 0.66 0.50 0.51 Control Delay (s/veh) 54.0 46.7 6.9 21.1 12.0 9.8 Queue Delay 0.0 0.1 0.0 0.3 0.1 0.2 Total Delay (s/veh) 54.0 46.8 6.9 21.4 12.1 10.0 L O S D DA CB B Approach Delay (s/veh) 54.0 46.8 20.4 10.6 Approach LOS D D C B Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 66 (66%), Referenced to phase 2:NBTL and 6:SBTL, Start of Green Natural Cycle: 65 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay (s/veh): 25.6 Intersection LOS: C Intersection Capacity Utilization 77.8% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street Lanes, Volumes, Timings Existing (2025) PM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 331 133 44 268 9 56 Future Volume (vph) 331 133 44 268 9 56 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.961 0.884 Flt Protected 0.993 0.993 Satd. Flow (prot) 1790 0 0 1850 1635 0 Flt Permitted 0.993 0.993 Satd. Flow (perm) 1790 0 0 1850 1635 0 Link Speed (mph) 25 25 25 Link Distance (ft) 413 1158 568 Travel Time (s) 11.3 31.6 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 368 148 49 298 10 62 Shared Lane Traffic (%) Lane Group Flow (vph) 516 0 0 347 72 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 56.0% ICU Level of Service B Analysis Period (min) 15 HCM 6th TWSC Existing (2025) PM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 6 Intersection Int Delay, s/veh 1.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 331 133 44 268 9 56 Future Vol, veh/h 331 133 44 268 9 56 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 368 148 49 298 10 62 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 516 0 838 442 Stage 1 - - - - 442 - Stage 2 - - - - 396 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1050 - 336 615 Stage 1 - - - - 648 - Stage 2 - - - - 680 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1050 - 317 615 Mov Cap-2 Maneuver - - - - 317 - Stage 1 - - - - 648 - Stage 2 - - - - 642 - Approach EB WB NB HCM Ctrl Dly, s/v 0 1.2 12.6 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 544 - - 1050 - HCM Lane V/C Ratio 0.133 - - 0.047 - HCM Ctrl Dly (s/v) 12.6 - - 8.6 0 HCM Lane LOS B - - A A HCM 95th %tile Q (veh) 0.5 - - 0.1 - Lanes, Volumes, Timings Existing (2025) PM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 16 542 11 75 275 11 5 78 209 107 67 6 Future Volume (vph) 16 542 11 75 275 11 5 78 209 107 67 6 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.996 0.904 0.995 Flt Protected 0.999 0.990 0.999 0.971 Satd. Flow (prot) 0 1855 0 0 1837 0 0 1682 0 0 1800 0 Flt Permitted 0.985 0.778 0.999 0.971 Satd. Flow (perm) 0 1829 0 0 1443 0 0 1682 0 0 1800 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 1 2 114 2 Link Speed (mph) 25 25 25 25 Link Distance (ft) 379 1213 1024 568 Travel Time (s) 10.3 33.1 27.9 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 18 602 12 83 306 12 6 87 232 119 74 7 Shared Lane Traffic (%) Lane Group Flow (vph) 0 632 0 0 401 0 0 325 0 0 200 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 0 1 1 1 1 Detector Template Left Thru Left Left Left Leading Detector (ft) 20 100 20 0 20 30 20 30 Trailing Detector (ft) 0 0 0 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 20 30 20 30 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 Detector 2 Size(ft) 6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 Turn Type Perm NA Perm NA Split NA Split NA Protected Phases 2 6 4 4 8 8 Permitted Phases 2 6 Detector Phase 2 2 6 6 4 4 8 8 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Lanes, Volumes, Timings Existing (2025) PM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 22.5 22.5 22.5 Total Split (s) 51.0 51.0 51.0 51.0 26.0 26.0 23.0 23.0 Total Split (%) 51.0% 51.0% 51.0% 51.0% 26.0% 26.0% 23.0% 23.0% Maximum Green (s) 46.5 46.5 46.5 46.5 21.5 21.5 18.5 18.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 3.0 3.0 3.0 Recall Mode C-Max C-Max Max Max None None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 0 0 0 Act Effct Green (s) 53.6 53.6 17.4 15.4 Actuated g/C Ratio 0.54 0.54 0.17 0.15 v/c Ratio 0.64 0.52 0.84 0.72 Control Delay (s/veh) 16.0 19.8 44.6 51.3 Queue Delay 1.2 0.0 0.0 0.0 Total Delay (s/veh) 17.2 19.8 44.6 51.3 LOS B B D D Approach Delay (s/veh) 17.2 19.8 44.6 51.3 Approach LOS B B D D Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 8 (8%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay (s/veh): 27.9 Intersection LOS: C Intersection Capacity Utilization 91.4% ICU Level of Service F Analysis Period (min) 15 Splits and Phases: 4: Hedge Street & Curtis Street Lanes, Volumes, Timings Existing (2025) PM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 3 217 2 15 175 4 4 0 6 14 0 28 Future Volume (vph) 3 217 2 15 175 4 4 0 6 14 0 28 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.997 0.914 0.911 Flt Protected 0.999 0.996 0.982 0.983 Satd. Flow (prot) 0 1859 0 0 1850 0 0 1672 0 0 1668 0 Flt Permitted 0.999 0.996 0.982 0.983 Satd. Flow (perm) 0 1859 0 0 1850 0 0 1672 0 0 1668 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1082 82 565 1260 Travel Time (s) 29.5 2.2 15.4 34.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 3 241 2 17 194 4 4 0 7 16 0 31 Shared Lane Traffic (%) Lane Group Flow (vph) 0 246 0 0 215 0 0 11 0 0 47 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.5% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Existing (2025) PM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 10 Intersection Int Delay, s/veh 1.5 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 3 2 1 72 1 5 1 7 54406 1 40 2 8 F u t u r e V o l , v e h / h 3 2 1 72 1 5 1 7 54406 1 40 2 8 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 3 2 4 12 1 7 1 9 44407 1 60 3 1 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 198 0 0 243 0 0 494 480 242 482 479 196 Stage 1 - ----- 2 4 8 2 4 8- 2 3 0 2 3 0- Stage 2 - ----- 2 4 6 2 3 2- 2 5 2 2 4 9- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1375 - - 1323 - - 486 485 797 495 486 845 Stage 1 - ----- 7 5 6 7 0 1- 7 7 3 7 1 4- Stage 2 - ----- 7 5 8 7 1 3- 7 5 2 7 0 1- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1375 - - 1323 - - 462 477 797 485 478 845 Mov Cap-2 Maneuver - ----- 4 6 2 4 7 7- 4 8 5 4 7 8- Stage 1 - ----- 7 5 4 6 9 9- 7 7 1 7 0 4- Stage 2 - ----- 7 2 0 7 0 3- 7 4 3 6 9 9- Approach EB WB NB SB HCM Ctrl Dly, s/v 0.1 0.6 10.9 10.7 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 618 1375 - - 1323 - - 677 HCM Lane V/C Ratio 0.018 0.002 - - 0.013 - - 0.069 HCM Ctrl Dly (s/v) 10.9 7.6 0 - 7.8 0 - 10.7 HCM Lane LOS B A A - A A - B HCM 95th %tile Q (veh) 0.1 0 - - 0 - - 0.2 Lanes, Volumes, Timings Existing (2025) PM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 4 255 2 31 244 10 9 0 23 11 0 29 Future Volume (vph) 4 255 2 31 244 10 9 0 23 11 0 29 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.995 0.902 0.902 Flt Protected 0.999 0.995 0.986 0.987 Satd. Flow (prot) 0 1859 0 0 1844 0 0 1657 0 0 1658 0 Flt Permitted 0.999 0.995 0.986 0.987 Satd. Flow (perm) 0 1859 0 0 1844 0 0 1657 0 0 1658 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1197 85 1027 565 Travel Time (s) 32.6 2.3 28.0 15.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 4 283 2 34 271 11 10 0 26 12 0 32 Shared Lane Traffic (%) Lane Group Flow (vph) 0 289 0 0 316 0 0 36 0 0 44 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 41.9% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Existing (2025) PM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 12 Intersection Int Delay, s/veh 1.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 4 255 2 31 244 10 9 0 23 11 0 29 Future Vol, veh/h 4 255 2 31 244 10 9 0 23 11 0 29 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 Mvmt Flow 4 283 2 34 271 11 10 0 26 12 0 32 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 282 0 0 285 0 0 653 642 284 650 638 277 Stage 1 - ----- 2 9 2 2 9 2- 3 4 5 3 4 5- Stage 2 - ----- 3 6 1 3 5 0- 3 0 5 2 9 3- Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 C r i t i c a l H d w y S t g 1 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- C r i t i c a l H d w y S t g 2 ------ 6 . 1 2 5 . 5 2- 6 . 1 2 5 . 5 2- Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 1280 - - 1277 - - 380 392 755 382 394 762 Stage 1 - ----- 7 1 6 6 7 1- 6 7 1 6 3 6- Stage 2 - ----- 6 5 7 6 3 3- 7 0 5 6 7 0- Platoon blocked, % - - - - Mov Cap-1 Maneuver 1280 - - 1277 - - 354 378 755 359 380 762 Mov Cap-2 Maneuver - ----- 3 5 4 3 7 8- 3 5 9 3 8 0- Stage 1 - ----- 7 1 3 6 6 8- 6 6 8 6 1 6- Stage 2 - ----- 6 0 9 6 1 3- 6 7 8 6 6 7- Approach EB WB NB SB HCM Ctrl Dly, s/v 0.1 0.9 11.7 11.7 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 573 1280 - - 1277 - - 582 HCM Lane V/C Ratio 0.062 0.003 - - 0.027 - - 0.076 HCM Ctrl Dly (s/v) 11.7 7.8 0 - 7.9 0 - 11.7 HCM Lane LOS B A A - A A - B HCM 95th %tile Q (veh) 0.2 0 - - 0.1 - - 0.2 Lanes, Volumes, Timings No-Build (2028) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 122 462 337 30 495 0 0 611 42 Future Volume (vph) 0 0 0 122 462 337 30 495 0 0 611 42 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 125 0 Storage Lanes 0 0 0 0 1 0 0 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.945 0.991 Flt Protected 0.993 0.950 S a t d . F l o w ( p r o t ) 0000 3321 0 1770 1863 0 0 1846 0 Flt Permitted 0.993 0.188 S a t d . F l o w ( p e r m ) 0000 3321 0 350 1863 0 0 1846 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 123 5 Link Speed (mph) 25 25 35 35 Link Distance (ft) 82 413 570 1253 Travel Time (s) 2.2 11.3 11.1 24.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 136 513 374 33 550 0 0 679 47 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 1023 0 33 550 0 0 726 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 2 Detector Template Left Thru Left Thru Thru Leading Detector (ft) 20 100 20 100 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 2 Lanes, Volumes, Timings No-Build (2028) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 8 8 5 2 6 Switch Phase Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0 Minimum Split (s) 22.5 22.5 9.5 22.5 22.5 Total Split (s) 38.0 38.0 9.6 62.0 52.4 Total Split (%) 38.0% 38.0% 9.6% 62.0% 52.4% Maximum Green (s) 33.5 33.5 5.1 57.5 47.9 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 32.5 58.5 58.5 52.8 Actuated g/C Ratio 0.33 0.59 0.59 0.53 v/c Ratio 0.88 0.12 0.50 0.74 Control Delay (s/veh) 38.0 3.0 4.0 25.8 Queue Delay 0.0 0.0 0.1 0.0 Total Delay (s/veh) 38.0 3.0 4.1 25.8 LOS D A A C Approach Delay (s/veh) 38.0 4.0 25.8 Approach LOS D A C Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 14 (14%), Referenced to phase 2:NBTL and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay (s/veh): 25.7 Intersection LOS: C Intersection Capacity Utilization 77.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: NE Main Street (SC 417) & College Street Lanes, Volumes, Timings No-Build (2028) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 6 5 3 3 3 2 70000 4 4 1 6 3 1 9 0 5 3 30 F u t u r e V o l u m e ( v p h ) 6 5 3 3 3 2 70000 4 4 1 6 3 1 9 0 5 3 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 225 0 Storage Lanes 0 0 0 0 0 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.990 0.983 Flt Protected 0.992 0.950 S a t d . F l o w ( p r o t ) 0 3 4 7 600000 1831 0 1770 1863 0 Flt Permitted 0.992 0.329 S a t d . F l o w ( p e r m ) 0 3 4 7 600000 1831 0 613 1863 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 6 10 Link Speed (mph) 25 25 35 35 Link Distance (ft) 85 379 1084 570 Travel Time (s) 2.3 10.3 21.1 11.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 7 2 3 7 0 3 00000 4 9 0 7 0 2 1 1 5 9 20 Shared Lane Traffic (%) Lane Group Flow (vph) 0 47 200000 5 6 00 2 1 1 5 9 20 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 2 Detector Template Left Thru Thru Left Thru Leading Detector (ft) 20 100 100 20 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA NA pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 6 Lanes, Volumes, Timings No-Build (2028) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 9.5 22.5 Total Split (s) 27.0 27.0 55.0 18.0 73.0 Total Split (%) 27.0% 27.0% 55.0% 18.0% 73.0% Maximum Green (s) 22.5 22.5 50.5 13.5 68.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 18.8 54.2 72.2 72.2 Actuated g/C Ratio 0.19 0.54 0.72 0.72 v/c Ratio 0.72 0.56 0.35 0.44 Control Delay (s/veh) 43.9 18.2 2.6 2.2 Queue Delay 0.0 0.0 0.0 0.3 Total Delay (s/veh) 43.9 18.2 2.6 2.5 LOS D B A A Approach Delay (s/veh) 43.9 18.2 2.5 Approach LOS D B A Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 9 (9%), Referenced to phase 2:NBT and 6:SBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay (s/veh): 18.0 Intersection LOS: B Intersection Capacity Utilization 77.2% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street Lanes, Volumes, Timings No-Build (2028) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 0 0 213 890 24 0 Future Volume (vph) 0 0 213 890 24 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt Flt Protected 0.990 0.950 Satd. Flow (prot) 0 0 0 3504 1770 0 Flt Permitted 0.990 0.950 Satd. Flow (perm) 0 0 0 3504 1770 0 Link Speed (mph) 25 25 25 Link Distance (ft) 413 1158 568 Travel Time (s) 11.3 31.6 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 237 989 27 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 1226 27 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 40.8% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC No-Build (2028) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 6 Intersection Int Delay, s/veh 0.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 0 0 213 890 24 0 Future Vol, veh/h 0 0 213 890 24 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 237 989 27 0 Major/Minor Major2 Minor1 Conflicting Flow All 0 0 969 - Stage 1 - - 0 - Stage 2 - - 969 - Critical Hdwy 4.14 - 6.84 - C r i t i c a l H d w y S t g 1 ---- Critical Hdwy Stg 2 - - 5.84 - Follow-up Hdwy 2.22 - 3.52 - Pot Cap-1 Maneuver - - 251 0 Stage 1 - - - 0 Stage 2 - - 329 0 Platoon blocked, % - Mov Cap-1 Maneuver - - 251 - Mov Cap-2 Maneuver - - 251 - Stage 1 ---- Stage 2 - - 329 - Approach WB NB HCM Ctrl Dly, s/v 21 HCM LOS C Minor Lane/Major Mvmt NBLn1 WBL WBT Capacity (veh/h) 251 - - HCM Lane V/C Ratio 0.106 - - HCM Ctrl Dly (s/v) 21 - - HCM Lane LOS C - - HCM 95th %tile Q (veh) 0.4 - - Lanes, Volumes, Timings No-Build (2028) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 4 5 0 1 5 40000 2 8 1 9 4 3 7 1 8 00 F u t u r e V o l u m e ( v p h ) 4 5 0 1 5 40000 2 8 1 9 4 3 7 1 8 00 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.986 0.882 Flt Protected 0.992 S a t d . F l o w ( p r o t ) 0 3 4 9 000000 1643 0 0 1848 0 Flt Permitted 0.992 S a t d . F l o w ( p e r m ) 0 3 4 9 000000 1643 0 0 1848 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 12 216 Link Speed (mph) 25 25 25 25 Link Distance (ft) 379 1213 1024 568 Travel Time (s) 10.3 33.1 27.9 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 4 5 5 7 6 00000 3 1 2 1 6 4 1 2 0 00 Shared Lane Traffic (%) Lane Group Flow (vph) 0 62 100000 2 4 700 2 4 10 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 1 1 Detector Template Left Thru Left Leading Detector (ft) 20 100 30 20 30 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 30 20 30 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 Detector 2 Size(ft) 6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 Turn Type Perm NA NA Split NA Protected Phases 2 4 8 8 Permitted Phases 2 Detector Phase 2 2 4 8 8 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 Lanes, Volumes, Timings No-Build (2028) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 38.0 29.0 33.0 33.0 Total Split (%) 38.0% 38.0% 29.0% 33.0% 33.0% Maximum Green (s) 33.5 33.5 24.5 28.5 28.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode C-Max C-Max None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 58.5 9.7 18.3 Actuated g/C Ratio 0.59 0.10 0.18 v/c Ratio 0.30 0.70 0.71 Control Delay (s/veh) 6.7 19.6 49.8 Queue Delay 0.2 0.0 0.0 Total Delay (s/veh) 6.9 19.6 49.8 LOS A B D Approach Delay (s/veh) 6.9 19.6 49.8 Approach LOS A B D Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 76 (76%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.71 Intersection Signal Delay (s/veh): 19.0 Intersection LOS: B Intersection Capacity Utilization 51.9% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: Hedge Street & Curtis Street Lanes, Volumes, Timings No-Build (2028) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 27 498 10 32 5 0 0 1 22 Future Volume (vph) 0 0 0 27 498 10 32 5 0 0 1 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.870 Flt Protected 0.997 0.959 S a t d . F l o w ( p r o t ) 0000 3518 0 0 1786 0 0 1621 0 Flt Permitted 0.997 0.959 S a t d . F l o w ( p e r m ) 0000 3518 0 0 1786 0 0 1621 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1082 82 565 1260 Travel Time (s) 29.5 2.2 15.4 34.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 30 553 11 36 6 0 0 1 24 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 5 9 400 4 200 2 50 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.2% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC No-Build (2028) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 10 Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 000 2 7 4 9 8 1 0 3 25001 2 2 F u t u r e V o l , v e h / h 000 2 7 4 9 8 1 0 3 25001 2 2 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 000 3 0 5 5 3 1 1 3 66001 2 4 Major/Minor Major2 Minor1 Minor2 Conflicting Flow All 0 0 0 337 624 - - 619 282 Stage 1 - - - 0 0 - - 619 - Stage 2 - - - 337 624 - - 0 - Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94 C r i t i c a l H d w y S t g 1 ------- 5 . 5 4- Critical Hdwy Stg 2 - - - 6.54 5.54 - - - - Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver - - - 593 400 0 0 403 715 Stage 1 ----- 0 0 4 7 8- Stage 2 - - - 651 476 0 0 - - Platoon blocked, % - - Mov Cap-1 Maneuver - - - 572 400 - - 403 715 Mov Cap-2 Maneuver - - - 572 400 - - 403 - Stage 1 ------- 4 7 8- Stage 2 - - - 627 476 - - - - Approach WB NB SB HCM Ctrl Dly, s/v 12.2 10.4 HCM LOS B B Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1 Capacity (veh/h) 541 - - - 692 HCM Lane V/C Ratio 0.076 - - - 0.037 HCM Ctrl Dly (s/v) 12.2 - - - 10.4 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.2 - - - 0.1 Lanes, Volumes, Timings No-Build (2028) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 6 4 0 2 1 300007 2 02 1 30 F u t u r e V o l u m e ( v p h ) 6 4 0 2 1 300007 2 02 1 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.996 0.901 Flt Protected 0.999 0.994 S a t d . F l o w ( p r o t ) 0 3 5 2 200000 1678 0 0 1852 0 Flt Permitted 0.999 0.994 S a t d . F l o w ( p e r m ) 0 3 5 2 200000 1678 0 0 1852 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1197 85 1027 565 Travel Time (s) 32.6 2.3 28.0 15.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 7 4 4 7 1 400008 2 22 1 40 Shared Lane Traffic (%) Lane Group Flow (vph) 0 46 800000 3 000 1 60 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.7% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC No-Build (2028) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 12 Intersection Int Delay, s/veh 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 6 4 0 2 1 300007 2 02 1 30 F u t u r e V o l , v e h / h 6 4 0 2 1 300007 2 02 1 30 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 7 4 4 7 1 400008 2 22 1 40 Major/Minor Major1 Minor1 Minor2 Conflicting Flow All 0 0 0 - 468 231 242 475 - Stage 1 - - - - 468 - 0 0 - Stage 2 - - - - 0 - 242 475 - Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 - C r i t i c a l H d w y S t g 1 --- - 5 . 5 4---- Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 - Pot Cap-1 Maneuver - - - 0 491 771 692 487 0 Stage 1 - - - 0 560 - - - 0 Stage 2 - - - 0 - - 740 556 0 Platoon blocked, % - - Mov Cap-1 Maneuver - - - - 491 771 664 487 - Mov Cap-2 Maneuver - - - - 491 - 664 487 - Stage 1 - - - - 560 - - - - Stage 2 - - - - - - 709 556 - Approach EB NB SB HCM Ctrl Dly, s/v 10.6 12.4 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1 Capacity (veh/h) 672 - - - 505 HCM Lane V/C Ratio 0.045 - - - 0.033 HCM Ctrl Dly (s/v) 10.6 - - - 12.4 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.1 - - - 0.1 Lanes, Volumes, Timings No-Build (2028) PM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 76 371 167 59 506 0 0 834 77 Future Volume (vph) 0 0 0 76 371 167 59 506 0 0 834 77 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 125 0 Storage Lanes 0 0 0 0 1 0 0 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.959 0.989 Flt Protected 0.994 0.950 S a t d . F l o w ( p r o t ) 0000 3374 0 1770 1863 0 0 1842 0 Flt Permitted 0.994 0.083 S a t d . F l o w ( p e r m ) 0000 3374 0 155 1863 0 0 1842 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 50 8 Link Speed (mph) 25 25 35 35 Link Distance (ft) 82 413 570 1253 Travel Time (s) 2.2 11.3 11.1 24.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 84 412 186 66 562 0 0 927 86 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 6 8 20 6 6 5 6 200 1013 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 2 Detector Template Left Thru Left Thru Thru Leading Detector (ft) 20 100 20 100 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 2 Lanes, Volumes, Timings No-Build (2028) PM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 8 8 5 2 6 Switch Phase Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0 Minimum Split (s) 22.5 22.5 9.5 22.5 22.5 Total Split (s) 27.0 27.0 10.0 73.0 63.0 Total Split (%) 27.0% 27.0% 10.0% 73.0% 63.0% Maximum Green (s) 22.5 22.5 5.5 68.5 58.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 21.9 69.1 69.1 61.1 Actuated g/C Ratio 0.22 0.69 0.69 0.61 v/c Ratio 0.88 0.34 0.44 0.90 Control Delay (s/veh) 48.6 7.7 2.0 30.5 Queue Delay 0.0 0.0 0.5 0.0 Total Delay (s/veh) 48.6 7.7 2.4 30.5 LOS D A A C Approach Delay (s/veh) 48.6 3.0 30.5 Approach LOS D A C Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 38 (38%), Referenced to phase 2:NBTL and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay (s/veh): 28.4 Intersection LOS: C Intersection Capacity Utilization 82.8% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 1: NE Main Street (SC 417) & College Street Lanes, Volumes, Timings No-Build (2028) PM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 5 2 4 5 5 5 10000 4 5 4 2 2 1 3 3 3 5 5 10 F u t u r e V o l u m e ( v p h ) 5 2 4 5 5 5 10000 4 5 4 2 2 1 3 3 3 5 5 10 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 225 0 Storage Lanes 0 0 0 0 0 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.986 0.956 Flt Protected 0.995 0.950 S a t d . F l o w ( p r o t ) 0 3 4 7 200000 1781 0 1770 1863 0 Flt Permitted 0.995 0.144 S a t d . F l o w ( p e r m ) 0 3 4 7 200000 1781 0 268 1863 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 10 33 Link Speed (mph) 25 25 35 35 Link Distance (ft) 85 379 1084 570 Travel Time (s) 2.3 10.3 21.1 11.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 5 8 5 0 6 5 70000 5 0 4 2 4 6 3 7 0 6 1 20 Shared Lane Traffic (%) Lane Group Flow (vph) 0 62 100000 7 5 00 3 7 0 6 1 20 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 2 Detector Template Left Thru Thru Left Thru Leading Detector (ft) 20 100 100 20 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA NA pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 6 Lanes, Volumes, Timings No-Build (2028) PM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 9.5 22.5 Total Split (s) 25.0 25.0 52.0 23.0 75.0 Total Split (%) 25.0% 25.0% 52.0% 23.0% 75.0% Maximum Green (s) 20.5 20.5 47.5 18.5 70.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 20.0 48.0 71.0 71.0 Actuated g/C Ratio 0.20 0.48 0.71 0.71 v/c Ratio 0.88 0.86 0.79 0.46 Control Delay (s/veh) 54.0 34.1 20.2 1.5 Queue Delay 0.0 0.0 0.7 0.4 Total Delay (s/veh) 54.0 34.1 21.0 1.9 LOS D C C A Approach Delay (s/veh) 54.0 34.1 9.1 Approach LOS D C A Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 39 (39%), Referenced to phase 2:NBT and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.88 Intersection Signal Delay (s/veh): 28.9 Intersection LOS: C Intersection Capacity Utilization 82.8% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street Lanes, Volumes, Timings No-Build (2028) PM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 0 0 138 576 21 0 Future Volume (vph) 0 0 138 576 21 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt Flt Protected 0.990 0.950 Satd. Flow (prot) 0 0 0 3504 1770 0 Flt Permitted 0.990 0.950 Satd. Flow (perm) 0 0 0 3504 1770 0 Link Speed (mph) 25 25 25 Link Distance (ft) 413 1158 568 Travel Time (s) 11.3 31.6 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 153 640 23 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 793 23 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 29.9% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC No-Build (2028) PM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 6 Intersection Int Delay, s/veh 0.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 0 0 138 576 21 0 Future Vol, veh/h 0 0 138 576 21 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 153 640 23 0 Major/Minor Major2 Minor1 Conflicting Flow All 0 0 626 - Stage 1 - - 0 - Stage 2 - - 626 - Critical Hdwy 4.14 - 6.84 - C r i t i c a l H d w y S t g 1 ---- Critical Hdwy Stg 2 - - 5.84 - Follow-up Hdwy 2.22 - 3.52 - Pot Cap-1 Maneuver - - 416 0 Stage 1 - - - 0 Stage 2 - - 495 0 Platoon blocked, % - Mov Cap-1 Maneuver - - 416 - Mov Cap-2 Maneuver - - 416 - Stage 1 ---- Stage 2 - - 495 - Approach WB NB HCM Ctrl Dly, s/v 14.2 HCM LOS B Minor Lane/Major Mvmt NBLn1 WBL WBT Capacity (veh/h) 416 - - HCM Lane V/C Ratio 0.056 - - HCM Ctrl Dly (s/v) 14.2 - - HCM Lane LOS B - - HCM 95th %tile Q (veh) 0.2 - - Lanes, Volumes, Timings No-Build (2028) PM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 1 7 9 2 6 1 5 30000 2 9 2 8 1 1 1 4 1 00 F u t u r e V o l u m e ( v p h ) 1 7 9 2 6 1 5 30000 2 9 2 8 1 1 1 4 1 00 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.979 0.878 Flt Protected 0.999 0.956 S a t d . F l o w ( p r o t ) 0 3 4 6 100000 1635 0 0 1781 0 Flt Permitted 0.999 0.956 S a t d . F l o w ( p e r m ) 0 3 4 6 100000 1635 0 0 1781 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 23 165 Link Speed (mph) 25 25 25 25 Link Distance (ft) 379 1213 1024 568 Travel Time (s) 10.3 33.1 27.9 15.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 19 1029 17 00000 3 2 3 1 2 1 2 7 1 10 Shared Lane Traffic (%) Lane Group Flow (vph) 0 121 800000 3 4 400 1 3 80 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 1 1 Detector Template Left Thru Left Leading Detector (ft) 20 100 30 20 30 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 30 20 30 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 Detector 2 Size(ft) 6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 Turn Type Perm NA NA Split NA Protected Phases 2 4 8 8 Permitted Phases 2 Detector Phase 2 2 4 8 8 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 Lanes, Volumes, Timings No-Build (2028) PM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 49.2 49.2 28.0 22.8 22.8 Total Split (%) 49.2% 49.2% 28.0% 22.8% 22.8% Maximum Green (s) 44.7 44.7 23.5 18.3 18.3 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode C-Max C-Max None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 56.8 16.7 13.0 Actuated g/C Ratio 0.57 0.17 0.13 v/c Ratio 0.62 0.84 0.60 Control Delay (s/veh) 9.8 38.3 51.2 Queue Delay 0.5 0.0 0.0 Total Delay (s/veh) 10.2 38.3 51.2 LOS B D D Approach Delay (s/veh) 10.2 38.3 51.2 Approach LOS B D D Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.84 Intersection Signal Delay (s/veh): 19.2 Intersection LOS: B Intersection Capacity Utilization 67.9% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 4: Hedge Street & Curtis Street Lanes, Volumes, Timings No-Build (2028) PM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 59 445 4 45 3 0 0 15 30 Future Volume (vph) 0 0 0 59 445 4 45 3 0 0 15 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.911 Flt Protected 0.994 0.955 S a t d . F l o w ( p r o t ) 0000 3514 0 0 1779 0 0 1697 0 Flt Permitted 0.994 0.955 S a t d . F l o w ( p e r m ) 0000 3514 0 0 1779 0 0 1697 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1082 82 565 1260 Travel Time (s) 29.5 2.2 15.4 34.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 66 494 4 50 3 0 0 17 33 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 5 6 400 5 300 5 00 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.1% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC No-Build (2028) PM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 10 Intersection Int Delay, s/veh 1.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 000 5 9 4 4 54 4 5300 1 5 3 0 F u t u r e V o l , v e h / h 000 5 9 4 4 54 4 5300 1 5 3 0 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 000 6 6 4 9 44 5 0300 1 7 3 3 Major/Minor Major2 Minor1 Minor2 Conflicting Flow All 0 0 0 388 630 - - 628 249 Stage 1 - - - 0 0 - - 628 - Stage 2 - - - 388 630 - - 0 - Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94 C r i t i c a l H d w y S t g 1 ------- 5 . 5 4- Critical Hdwy Stg 2 - - - 6.54 5.54 - - - - Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver - - - 545 397 0 0 398 751 Stage 1 ----- 0 0 4 7 4- Stage 2 - - - 607 473 0 0 - - Platoon blocked, % - - Mov Cap-1 Maneuver - - - 504 397 - - 398 751 Mov Cap-2 Maneuver - - - 504 397 - - 398 - Stage 1 ------- 4 7 4- Stage 2 - - - 560 473 - - - - Approach WB NB SB HCM Ctrl Dly, s/v 13.1 11.8 HCM LOS B B Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1 Capacity (veh/h) 496 - - - 580 HCM Lane V/C Ratio 0.108 - - - 0.086 HCM Ctrl Dly (s/v) 13.1 - - - 11.8 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.4 - - - 0.3 Lanes, Volumes, Timings No-Build (2028) PM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 7 5 0 1400003 3 1 2 7 3 10 F u t u r e V o l u m e ( v p h ) 7 5 0 1400003 3 1 2 7 3 10 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.876 Flt Protected 0.999 0.977 S a t d . F l o w ( p r o t ) 0 3 5 3 200000 1632 0 0 1820 0 Flt Permitted 0.999 0.977 S a t d . F l o w ( p e r m ) 0 3 5 3 200000 1632 0 0 1820 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1197 85 1027 565 Travel Time (s) 32.6 2.3 28.0 15.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 8 5 5 7400003 3 4 3 0 3 40 Shared Lane Traffic (%) Lane Group Flow (vph) 0 56 900000 3 700 6 40 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.6% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC No-Build (2028) PM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 12 Intersection Int Delay, s/veh 1.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 7 5 0 1400003 3 1 2 7 3 10 F u t u r e V o l , v e h / h 7 5 0 1400003 3 1 2 7 3 10 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 8 5 5 7400003 3 4 3 0 3 40 Major/Minor Major1 Minor1 Minor2 Conflicting Flow All 0 0 0 - 575 281 296 577 - Stage 1 - - - - 575 - 0 0 - Stage 2 - - - - 0 - 296 577 - Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 - C r i t i c a l H d w y S t g 1 --- - 5 . 5 4---- Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 - Pot Cap-1 Maneuver - - - 0 427 716 634 426 0 Stage 1 - - - 0 501 - - - 0 Stage 2 - - - 0 - - 688 500 0 Platoon blocked, % - - Mov Cap-1 Maneuver - - - - 427 716 600 426 - Mov Cap-2 Maneuver - - - - 427 - 600 426 - Stage 1 - - - - 501 - - - - Stage 2 - - - - - - 651 500 - Approach EB NB SB HCM Ctrl Dly, s/v 10.6 13.4 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1 Capacity (veh/h) 676 - - - 492 HCM Lane V/C Ratio 0.056 - - - 0.131 HCM Ctrl Dly (s/v) 10.6 - - - 13.4 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.2 - - - 0.4 Lanes, Volumes, Timings Build (2028) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 129 472 352 30 495 0 0 620 42 Future Volume (vph) 0 0 0 129 472 352 30 495 0 0 620 42 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 125 0 Storage Lanes 0 0 0 0 1 0 0 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.945 0.991 Flt Protected 0.993 0.950 S a t d . F l o w ( p r o t ) 0000 3321 0 1770 1863 0 0 1846 0 Flt Permitted 0.993 0.179 S a t d . F l o w ( p e r m ) 0000 3321 0 333 1863 0 0 1846 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 128 5 Link Speed (mph) 25 25 35 35 Link Distance (ft) 82 314 570 1253 Travel Time (s) 2.2 8.6 11.1 24.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 143 524 391 33 550 0 0 689 47 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 1058 0 33 550 0 0 736 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 2 Detector Template Left Thru Left Thru Thru Leading Detector (ft) 20 100 20 100 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 2 Lanes, Volumes, Timings Build (2028) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 8 8 5 2 6 Switch Phase Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0 Minimum Split (s) 22.5 22.5 9.5 22.5 22.5 Total Split (s) 38.0 38.0 9.6 62.0 52.4 Total Split (%) 38.0% 38.0% 9.6% 62.0% 52.4% Maximum Green (s) 33.5 33.5 5.1 57.5 47.9 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 32.7 58.3 58.3 52.5 Actuated g/C Ratio 0.33 0.58 0.58 0.53 v/c Ratio 0.90 0.12 0.51 0.76 Control Delay (s/veh) 39.8 3.1 4.0 26.5 Queue Delay 0.0 0.0 0.1 0.0 Total Delay (s/veh) 39.8 3.1 4.2 26.5 LOS D A A C Approach Delay (s/veh) 39.8 4.1 26.5 Approach LOS D A C Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 14 (14%), Referenced to phase 2:NBTL and 6:SBT, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.90 Intersection Signal Delay (s/veh): 26.9 Intersection LOS: C Intersection Capacity Utilization 78.7% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 1: NE Main Street (SC 417) & College Street Lanes, Volumes, Timings Build (2028) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 6 5 3 3 9 2 70000 4 4 1 6 7 1 9 9 5 4 00 F u t u r e V o l u m e ( v p h ) 6 5 3 3 9 2 70000 4 4 1 6 7 1 9 9 5 4 00 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 225 0 Storage Lanes 0 0 0 0 0 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.991 0.982 Flt Protected 0.993 0.950 S a t d . F l o w ( p r o t ) 0 3 4 8 300000 1829 0 1770 1863 0 Flt Permitted 0.993 0.326 S a t d . F l o w ( p e r m ) 0 3 4 8 300000 1829 0 607 1863 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 6 11 Link Speed (mph) 25 25 35 35 Link Distance (ft) 85 379 1084 570 Travel Time (s) 2.3 10.3 21.1 11.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 7 2 3 7 7 3 00000 4 9 0 7 4 2 2 1 6 0 00 Shared Lane Traffic (%) Lane Group Flow (vph) 0 47 900000 5 6 40 2 2 1 6 0 00 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 2 Detector Template Left Thru Thru Left Thru Leading Detector (ft) 20 100 100 20 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA NA pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 6 Lanes, Volumes, Timings Build (2028) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 9.5 22.5 Total Split (s) 27.0 27.0 55.0 18.0 73.0 Total Split (%) 27.0% 27.0% 55.0% 18.0% 73.0% Maximum Green (s) 22.5 22.5 50.5 13.5 68.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 18.9 54.1 72.1 72.1 Actuated g/C Ratio 0.19 0.54 0.72 0.72 v/c Ratio 0.72 0.57 0.37 0.45 Control Delay (s/veh) 44.0 18.4 2.7 2.2 Queue Delay 0.0 0.0 0.0 0.3 Total Delay (s/veh) 44.0 18.4 2.7 2.5 LOS D B A A Approach Delay (s/veh) 44.0 18.4 2.6 Approach LOS D B A Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 9 (9%), Referenced to phase 2:NBT and 6:SBTL, Start of Green Natural Cycle: 60 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.72 Intersection Signal Delay (s/veh): 18.0 Intersection LOS: B Intersection Capacity Utilization 78.7% ICU Level of Service D Analysis Period (min) 15 Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street Lanes, Volumes, Timings Build (2028) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 0 0 217 893 31 0 Future Volume (vph) 0 0 217 893 31 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt Flt Protected 0.990 0.950 Satd. Flow (prot) 0 0 0 3504 1770 0 Flt Permitted 0.990 0.950 Satd. Flow (perm) 0 0 0 3504 1770 0 Link Speed (mph) 25 25 25 Link Distance (ft) 99 1158 256 Travel Time (s) 2.7 31.6 7.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 241 992 34 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 1233 34 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 41.0% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 6 Intersection Int Delay, s/veh 0.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 0 0 217 893 31 0 Future Vol, veh/h 0 0 217 893 31 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 241 992 34 0 Major/Minor Major2 Minor1 Conflicting Flow All 0 0 978 - Stage 1 - - 0 - Stage 2 - - 978 - Critical Hdwy 4.14 - 6.84 - C r i t i c a l H d w y S t g 1 ---- Critical Hdwy Stg 2 - - 5.84 - Follow-up Hdwy 2.22 - 3.52 - Pot Cap-1 Maneuver - - 248 0 Stage 1 - - - 0 Stage 2 - - 325 0 Platoon blocked, % - Mov Cap-1 Maneuver - - 248 - Mov Cap-2 Maneuver - - 248 - Stage 1 ---- Stage 2 - - 325 - Approach WB NB HCM Ctrl Dly, s/v 21.8 HCM LOS C Minor Lane/Major Mvmt NBLn1 WBL WBT Capacity (veh/h) 248 - - HCM Lane V/C Ratio 0.139 - - HCM Ctrl Dly (s/v) 21.8 - - HCM Lane LOS C - - HCM 95th %tile Q (veh) 0.5 - - Lanes, Volumes, Timings Build (2028) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 2 3 5 0 1 5 40000 3 1 1 9 4 4 9 1 8 50 F u t u r e V o l u m e ( v p h ) 2 3 5 0 1 5 40000 3 1 1 9 4 4 9 1 8 50 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.986 0.883 Flt Protected 0.998 0.990 S a t d . F l o w ( p r o t ) 0 3 4 8 300000 1645 0 0 1844 0 Flt Permitted 0.998 0.990 S a t d . F l o w ( p e r m ) 0 3 4 8 300000 1645 0 0 1844 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 12 216 Link Speed (mph) 25 25 25 25 Link Distance (ft) 379 1213 1024 312 Travel Time (s) 10.3 33.1 27.9 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 2 6 5 5 7 6 00000 3 4 2 1 6 5 4 2 0 60 Shared Lane Traffic (%) Lane Group Flow (vph) 0 64 300000 2 5 000 2 6 00 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 1 1 Detector Template Left Thru Left Leading Detector (ft) 20 100 30 20 30 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 30 20 30 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 Detector 2 Size(ft) 6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 Turn Type Perm NA NA Split NA Protected Phases 2 4 8 8 Permitted Phases 2 Detector Phase 2 2 4 8 8 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 Lanes, Volumes, Timings Build (2028) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 38.0 38.0 29.0 33.0 33.0 Total Split (%) 38.0% 38.0% 29.0% 33.0% 33.0% Maximum Green (s) 33.5 33.5 24.5 28.5 28.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode C-Max C-Max None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 57.3 9.8 19.3 Actuated g/C Ratio 0.57 0.10 0.19 v/c Ratio 0.32 0.70 0.73 Control Delay (s/veh) 7.4 19.9 49.5 Queue Delay 0.2 0.0 0.0 Total Delay (s/veh) 7.6 19.9 49.5 LOS A B D Approach Delay (s/veh) 7.6 19.9 49.5 Approach LOS A B D Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 76 (76%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 70 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.73 Intersection Signal Delay (s/veh): 19.7 Intersection LOS: B Intersection Capacity Utilization 53.5% ICU Level of Service A Analysis Period (min) 15 Splits and Phases: 4: Hedge Street & Curtis Street Lanes, Volumes, Timings Build (2028) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 27 508 10 32 5 0 0 1 22 Future Volume (vph) 0 0 0 27 508 10 32 5 0 0 1 22 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.997 0.870 Flt Protected 0.998 0.959 S a t d . F l o w ( p r o t ) 0000 3522 0 0 1786 0 0 1621 0 Flt Permitted 0.998 0.959 S a t d . F l o w ( p e r m ) 0000 3522 0 0 1786 0 0 1621 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1082 82 565 1260 Travel Time (s) 29.5 2.2 15.4 34.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 30 564 11 36 6 0 0 1 24 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 6 0 500 4 200 2 50 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.5% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 10 Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 000 2 7 5 0 8 1 0 3 25001 2 2 F u t u r e V o l , v e h / h 000 2 7 5 0 8 1 0 3 25001 2 2 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 000 3 0 5 6 4 1 1 3 66001 2 4 Major/Minor Major2 Minor1 Minor2 Conflicting Flow All 0 0 0 343 635 - - 630 288 Stage 1 - - - 0 0 - - 630 - Stage 2 - - - 343 635 - - 0 - Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94 C r i t i c a l H d w y S t g 1 ------- 5 . 5 4- Critical Hdwy Stg 2 - - - 6.54 5.54 - - - - Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver - - - 587 394 0 0 397 709 Stage 1 ----- 0 0 4 7 3- Stage 2 - - - 646 471 0 0 - - Platoon blocked, % - - Mov Cap-1 Maneuver - - - 565 394 - - 397 709 Mov Cap-2 Maneuver - - - 565 394 - - 397 - Stage 1 ------- 4 7 3- Stage 2 - - - 622 471 - - - - Approach WB NB SB HCM Ctrl Dly, s/v 12.3 10.5 HCM LOS B B Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1 Capacity (veh/h) 534 - - - 686 HCM Lane V/C Ratio 0.077 - - - 0.037 HCM Ctrl Dly (s/v) 12.3 - - - 10.5 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.2 - - - 0.1 Lanes, Volumes, Timings Build (2028) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 6 4 0 8 1 300007 2 02 1 30 F u t u r e V o l u m e ( v p h ) 6 4 0 8 1 300007 2 02 1 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.996 0.901 Flt Protected 0.999 0.994 S a t d . F l o w ( p r o t ) 0 3 5 2 200000 1678 0 0 1852 0 Flt Permitted 0.999 0.994 S a t d . F l o w ( p e r m ) 0 3 5 2 200000 1678 0 0 1852 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1197 85 1027 565 Travel Time (s) 32.6 2.3 28.0 15.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 7 4 5 3 1 400008 2 22 1 40 Shared Lane Traffic (%) Lane Group Flow (vph) 0 47 400000 3 000 1 60 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 21.9% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 12 Intersection Int Delay, s/veh 1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 6 4 0 8 1 300007 2 02 1 30 F u t u r e V o l , v e h / h 6 4 0 8 1 300007 2 02 1 30 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 7 4 5 3 1 400008 2 22 1 40 Major/Minor Major1 Minor1 Minor2 Conflicting Flow All 0 0 0 - 474 234 245 481 - Stage 1 - - - - 474 - 0 0 - Stage 2 - - - - 0 - 245 481 - Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 - C r i t i c a l H d w y S t g 1 --- - 5 . 5 4---- Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 - Pot Cap-1 Maneuver - - - 0 488 768 688 483 0 Stage 1 - - - 0 556 - - - 0 Stage 2 - - - 0 - - 737 552 0 Platoon blocked, % - - Mov Cap-1 Maneuver - - - - 488 768 660 483 - Mov Cap-2 Maneuver - - - - 488 - 660 483 - Stage 1 - - - - 556 - - - - Stage 2 - - - - - - 706 552 - Approach EB NB SB HCM Ctrl Dly, s/v 10.6 12.4 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1 Capacity (veh/h) 669 - - - 501 HCM Lane V/C Ratio 0.045 - - - 0.033 HCM Ctrl Dly (s/v) 10.6 - - - 12.4 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.1 - - - 0.1 Lanes, Volumes, Timings Build (2028) AM 11: Hedge Street & Access A Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 13 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 7 17 22 32 217 4 Future Volume (vph) 7 17 22 32 217 4 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.905 0.998 Flt Protected 0.985 0.980 Satd. Flow (prot) 1660 0 0 1825 1859 0 Flt Permitted 0.985 0.980 Satd. Flow (perm) 1660 0 0 1825 1859 0 Link Speed (mph) 25 25 25 Link Distance (ft) 1169 312 256 Travel Time (s) 31.9 8.5 7.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 8 19 24 36 241 4 Shared Lane Traffic (%) Lane Group Flow (vph) 27 0 0 60 245 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 28.3% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 11: Hedge Street & Access A Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 14 Intersection Int Delay, s/veh 1.4 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 7 17 22 32 217 4 Future Vol, veh/h 7 17 22 32 217 4 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 8 19 24 36 241 4 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 327 243 245 0 - 0 Stage 1 243 ----- Stage 2 84 ----- Critical Hdwy 6.42 6.22 4.12 - - - C r i t i c a l H d w y S t g 1 5 . 4 2----- C r i t i c a l H d w y S t g 2 5 . 4 2----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 667 796 1321 - - - Stage 1 797 ----- Stage 2 939 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 654 796 1321 - - - Mov Cap-2 Maneuver 654 ----- Stage 1 782 ----- Stage 2 939 ----- Approach EB NB SB HCM Ctrl Dly, s/v 10 3.2 0 HCM LOS B Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1321 - 749 - - HCM Lane V/C Ratio 0.019 - 0.036 - - HCM Ctrl Dly (s/v) 7.8 0 10 - - HCM Lane LOS A A B - - HCM 95th %tile Q (veh) 0.1 - 0.1 - - Lanes, Volumes, Timings Build (2028) AM 18: Access B & College Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 15 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 0 0 3 921 25 0 Future Volume (vph) 0 0 3 921 25 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt Flt Protected 0.950 Satd. Flow (prot) 0 0 0 3539 1770 0 Flt Permitted 0.950 Satd. Flow (perm) 0 0 0 3539 1770 0 Link Speed (mph) 25 25 30 Link Distance (ft) 314 99 1024 Travel Time (s) 8.6 2.7 23.3 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 3 1023 28 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 1026 28 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 35.5% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 18: Access B & College Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 16 Intersection Int Delay, s/veh 0.3 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 0 0 3 921 25 0 Future Vol, veh/h 0 0 3 921 25 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 3 1023 28 0 Major/Minor Major2 Minor1 Conflicting Flow All 0 0 518 - Stage 1 - - 0 - Stage 2 - - 518 - Critical Hdwy 4.14 - 6.84 - C r i t i c a l H d w y S t g 1 ---- Critical Hdwy Stg 2 - - 5.84 - Follow-up Hdwy 2.22 - 3.52 - Pot Cap-1 Maneuver - - 487 0 Stage 1 - - - 0 Stage 2 - - 563 0 Platoon blocked, % - Mov Cap-1 Maneuver - - 487 - Mov Cap-2 Maneuver - - 487 - Stage 1 ---- Stage 2 - - 563 - Approach WB NB HCM Ctrl Dly, s/v 12.8 HCM LOS B Minor Lane/Major Mvmt NBLn1 WBL WBT Capacity (veh/h) 487 - - HCM Lane V/C Ratio 0.057 - - HCM Ctrl Dly (s/v) 12.8 - - HCM Lane LOS B - - HCM 95th %tile Q (veh) 0.2 - - Lanes, Volumes, Timings Build (2028) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 1 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 85 383 186 59 506 0 0 857 77 Future Volume (vph) 0 0 0 85 383 186 59 506 0 0 857 77 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 125 0 Storage Lanes 0 0 0 0 1 0 0 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.957 0.989 Flt Protected 0.994 0.950 S a t d . F l o w ( p r o t ) 0000 3367 0 1770 1863 0 0 1842 0 Flt Permitted 0.994 0.063 S a t d . F l o w ( p e r m ) 0000 3367 0 117 1863 0 0 1842 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 55 8 Link Speed (mph) 25 25 35 35 Link Distance (ft) 82 313 570 1253 Travel Time (s) 2.2 8.5 11.1 24.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 94 426 207 66 562 0 0 952 86 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 7 2 70 6 6 5 6 200 1038 0 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 2 2 Detector Template Left Thru Left Thru Thru Leading Detector (ft) 20 100 20 100 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 20 6 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA pm+pt NA NA Protected Phases 8 5 2 6 Permitted Phases 8 2 Lanes, Volumes, Timings Build (2028) AM 1: NE Main Street (SC 417) & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 2 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 8 8 5 2 6 Switch Phase Minimum Initial (s) 7.0 7.0 5.0 12.0 12.0 Minimum Split (s) 22.5 22.5 9.5 22.5 22.5 Total Split (s) 27.0 27.0 10.0 73.0 63.0 Total Split (%) 27.0% 27.0% 10.0% 73.0% 63.0% Maximum Green (s) 22.5 22.5 5.5 68.5 58.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lag Lead Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None None C-Max C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 22.3 68.7 68.7 60.7 Actuated g/C Ratio 0.22 0.69 0.69 0.61 v/c Ratio 0.92 0.39 0.44 0.93 Control Delay (s/veh) 52.9 13.1 2.0 34.0 Queue Delay 0.0 0.0 0.5 0.0 Total Delay (s/veh) 52.9 13.1 2.5 34.0 LOS D B A C Approach Delay (s/veh) 52.9 3.6 34.0 Approach LOS D A C Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 38 (38%), Referenced to phase 2:NBTL and 6:SBT, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.93 Intersection Signal Delay (s/veh): 31.8 Intersection LOS: C Intersection Capacity Utilization 85.2% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 1: NE Main Street (SC 417) & College Street Lanes, Volumes, Timings Build (2028) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 3 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 5 2 4 7 0 5 10000 4 5 4 2 3 3 3 5 6 5 6 00 F u t u r e V o l u m e ( v p h ) 5 2 4 7 0 5 10000 4 5 4 2 3 3 3 5 6 5 6 00 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Storage Length (ft) 0 0 0 0 150 0 225 0 Storage Lanes 0 0 0 0 0 0 1 0 Taper Length (ft) 100 100 100 100 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.987 0.954 Flt Protected 0.995 0.950 S a t d . F l o w ( p r o t ) 0 3 4 7 600000 1777 0 1770 1863 0 Flt Permitted 0.995 0.131 S a t d . F l o w ( p e r m ) 0 3 4 7 600000 1777 0 244 1863 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 9 35 Link Speed (mph) 25 25 35 35 Link Distance (ft) 85 379 1084 570 Travel Time (s) 2.3 10.3 21.1 11.1 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 5 8 5 2 2 5 70000 5 0 4 2 5 9 3 9 6 6 2 20 Shared Lane Traffic (%) Lane Group Flow (vph) 0 63 700000 7 6 30 3 9 6 6 2 20 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 12 12 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 2 1 2 Detector Template Left Thru Thru Left Thru Leading Detector (ft) 20 100 100 20 100 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 6 20 6 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 94 94 Detector 2 Size(ft) 6 6 6 Detector 2 Type Cl+Ex Cl+Ex Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 0.0 0.0 Turn Type Perm NA NA pm+pt NA Protected Phases 4 2 1 6 Permitted Phases 4 6 Lanes, Volumes, Timings Build (2028) AM 2: NE Main Street (SC 417) & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 4 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Detector Phase 4 4 2 1 6 Switch Phase Minimum Initial (s) 7.0 7.0 12.0 5.0 12.0 Minimum Split (s) 22.5 22.5 22.5 9.5 22.5 Total Split (s) 25.0 25.0 52.0 23.0 75.0 Total Split (%) 25.0% 25.0% 52.0% 23.0% 75.0% Maximum Green (s) 20.5 20.5 47.5 18.5 70.5 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 4.5 Lead/Lag Lead Lag Lead-Lag Optimize? Yes Yes Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode None None C-Max None C-Max Walk Time (s) 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 Act Effct Green (s) 20.3 47.7 70.7 70.7 Actuated g/C Ratio 0.20 0.48 0.71 0.71 v/c Ratio 0.89 0.88 0.87 0.47 Control Delay (s/veh) 54.9 36.3 26.1 1.5 Queue Delay 0.0 0.0 4.2 0.5 Total Delay (s/veh) 54.9 36.3 30.3 1.9 LOS D D C A Approach Delay (s/veh) 54.9 36.3 13.0 Approach LOS D D B Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 39 (39%), Referenced to phase 2:NBT and 6:SBTL, Start of Green Natural Cycle: 90 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.89 Intersection Signal Delay (s/veh): 31.4 Intersection LOS: C Intersection Capacity Utilization 85.2% ICU Level of Service E Analysis Period (min) 15 Splits and Phases: 2: NE Main Street (SC 417) & Curtis Street Lanes, Volumes, Timings Build (2028) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 5 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 0 0 150 584 30 0 Future Volume (vph) 0 0 150 584 30 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt Flt Protected 0.990 0.950 Satd. Flow (prot) 0 0 0 3504 1770 0 Flt Permitted 0.990 0.950 Satd. Flow (perm) 0 0 0 3504 1770 0 Link Speed (mph) 25 25 25 Link Distance (ft) 100 1158 256 Travel Time (s) 2.7 31.6 7.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 167 649 33 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 816 33 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.5% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 3: Hedge Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 6 Intersection Int Delay, s/veh 0.6 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 0 0 150 584 30 0 Future Vol, veh/h 0 0 150 584 30 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 167 649 33 0 Major/Minor Major2 Minor1 Conflicting Flow All 0 0 659 - Stage 1 - - 0 - Stage 2 - - 659 - Critical Hdwy 4.14 - 6.84 - C r i t i c a l H d w y S t g 1 ---- Critical Hdwy Stg 2 - - 5.84 - Follow-up Hdwy 2.22 - 3.52 - Pot Cap-1 Maneuver - - 397 0 Stage 1 - - - 0 Stage 2 - - 476 0 Platoon blocked, % - Mov Cap-1 Maneuver - - 397 - Mov Cap-2 Maneuver - - 397 - Stage 1 ---- Stage 2 - - 476 - Approach WB NB HCM Ctrl Dly, s/v 14.9 HCM LOS B Minor Lane/Major Mvmt NBLn1 WBL WBT Capacity (veh/h) 397 - - HCM Lane V/C Ratio 0.084 - - HCM Ctrl Dly (s/v) 14.9 - - HCM Lane LOS B - - HCM 95th %tile Q (veh) 0.3 - - Lanes, Volumes, Timings Build (2028) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 7 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 6 7 9 2 6 1 5 30000 3 6 2 8 1 1 3 0 1 60 F u t u r e V o l u m e ( v p h ) 6 7 9 2 6 1 5 30000 3 6 2 8 1 1 3 0 1 60 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.980 0.880 Flt Protected 0.997 0.957 S a t d . F l o w ( p r o t ) 0 3 4 5 800000 1639 0 0 1783 0 Flt Permitted 0.997 0.957 S a t d . F l o w ( p e r m ) 0 3 4 5 800000 1639 0 0 1783 0 Right Turn on Red Yes Yes Yes Yes Satd. Flow (RTOR) 22 150 Link Speed (mph) 25 25 25 25 Link Distance (ft) 379 1213 1024 312 Travel Time (s) 10.3 33.1 27.9 8.5 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 74 1029 17 00000 4 0 3 1 2 1 4 4 1 80 Shared Lane Traffic (%) Lane Group Flow (vph) 0 127 300000 3 5 200 1 6 20 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Number of Detectors 1 2 1 1 1 Detector Template Left Thru Left Leading Detector (ft) 20 100 30 20 30 Trailing Detector (ft) 0 0 0 0 0 Detector 1 Position(ft) 0 0 0 0 0 Detector 1 Size(ft) 20 6 30 20 30 Detector 1 Type Cl+Ex Cl+Ex Cl+Ex Cl+Ex Cl+Ex Detector 1 Channel Detector 1 Extend (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Queue (s) 0.0 0.0 0.0 0.0 0.0 Detector 1 Delay (s) 0.0 0.0 0.0 0.0 0.0 Detector 2 Position(ft) 94 Detector 2 Size(ft) 6 Detector 2 Type Cl+Ex Detector 2 Channel Detector 2 Extend (s) 0.0 Turn Type Perm NA NA Split NA Protected Phases 2 4 8 8 Permitted Phases 2 Detector Phase 2 2 4 8 8 Switch Phase Minimum Initial (s) 7.0 7.0 7.0 7.0 7.0 Lanes, Volumes, Timings Build (2028) AM 4: Hedge Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 8 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Minimum Split (s) 22.5 22.5 22.5 22.5 22.5 Total Split (s) 49.2 49.2 28.0 22.8 22.8 Total Split (%) 49.2% 49.2% 28.0% 22.8% 22.8% Maximum Green (s) 44.7 44.7 23.5 18.3 18.3 Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 Lost Time Adjust (s) 0.0 0.0 0.0 Total Lost Time (s) 4.5 4.5 4.5 Lead/Lag Lead-Lag Optimize? Vehicle Extension (s) 3.0 3.0 3.0 3.0 3.0 Recall Mode C-Max C-Max None None None Walk Time (s) 7.0 7.0 7.0 7.0 7.0 Flash Don't Walk (s) 11.0 11.0 11.0 11.0 11.0 Pedestrian Calls (#/hr) 0 0 0 0 0 Act Effct Green (s) 54.7 17.8 14.0 Actuated g/C Ratio 0.55 0.18 0.14 v/c Ratio 0.67 0.85 0.65 Control Delay (s/veh) 10.6 41.1 52.4 Queue Delay 0.7 0.0 0.0 Total Delay (s/veh) 11.2 41.1 52.4 LOS B D D Approach Delay (s/veh) 11.2 41.1 52.4 Approach LOS B D D Intersection Summary Area Type: Other Cycle Length: 100 Actuated Cycle Length: 100 Offset: 0 (0%), Referenced to phase 2:EBTL, Start of Green Natural Cycle: 80 Control Type: Actuated-Coordinated Maximum v/c Ratio: 0.85 Intersection Signal Delay (s/veh): 20.8 Intersection LOS: C Intersection Capacity Utilization 71.0% ICU Level of Service C Analysis Period (min) 15 Splits and Phases: 4: Hedge Street & Curtis Street Lanes, Volumes, Timings Build (2028) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 9 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (vph) 0 0 0 59 457 4 45 3 0 0 15 30 Future Volume (vph) 0 0 0 59 457 4 45 3 0 0 15 30 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.911 Flt Protected 0.994 0.955 S a t d . F l o w ( p r o t ) 0000 3514 0 0 1779 0 0 1697 0 Flt Permitted 0.994 0.955 S a t d . F l o w ( p e r m ) 0000 3514 0 0 1779 0 0 1697 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1082 82 565 1260 Travel Time (s) 29.5 2.2 15.4 34.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 0 66 508 4 50 3 0 0 17 33 Shared Lane Traffic (%) Lane Group Flow (vph) 0000 5 7 800 5 300 5 00 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 30.5% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 5: Main Street & College Street Bur dette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 10 Intersection Int Delay, s/veh 1.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 000 5 9 4 5 74 4 5300 1 5 3 0 F u t u r e V o l , v e h / h 000 5 9 4 5 74 4 5300 1 5 3 0 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 000 6 6 5 0 84 5 0300 1 7 3 3 Major/Minor Major2 Minor1 Minor2 Conflicting Flow All 0 0 0 395 644 - - 642 256 Stage 1 - - - 0 0 - - 642 - Stage 2 - - - 395 644 - - 0 - Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94 C r i t i c a l H d w y S t g 1 ------- 5 . 5 4- Critical Hdwy Stg 2 - - - 6.54 5.54 - - - - Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32 Pot Cap-1 Maneuver - - - 539 390 0 0 391 743 Stage 1 ----- 0 0 4 6 7- Stage 2 - - - 602 466 0 0 - - Platoon blocked, % - - Mov Cap-1 Maneuver - - - 498 390 - - 391 743 Mov Cap-2 Maneuver - - - 498 390 - - 391 - Stage 1 ------- 4 6 7- Stage 2 - - - 554 466 - - - - Approach WB NB SB HCM Ctrl Dly, s/v 13.2 11.9 HCM LOS B B Minor Lane/Major Mvmt NBLn1 WBL WBT WBR SBLn1 Capacity (veh/h) 490 - - - 572 HCM Lane V/C Ratio 0.109 - - - 0.087 HCM Ctrl Dly (s/v) 13.2 - - - 11.9 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.4 - - - 0.3 Lanes, Volumes, Timings Build (2028) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 11 Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l u m e ( v p h ) 7 5 1 6400003 3 1 2 7 3 10 F u t u r e V o l u m e ( v p h ) 7 5 1 6400003 3 1 2 7 3 10 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 Lane Util. Factor 0.95 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.999 0.876 Flt Protected 0.999 0.977 S a t d . F l o w ( p r o t ) 0 3 5 3 200000 1632 0 0 1820 0 Flt Permitted 0.999 0.977 S a t d . F l o w ( p e r m ) 0 3 5 3 200000 1632 0 0 1820 0 Link Speed (mph) 25 25 25 25 Link Distance (ft) 1197 85 1027 565 Travel Time (s) 32.6 2.3 28.0 15.4 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 0.90 A d j . F l o w ( v p h ) 8 5 7 3400003 3 4 3 0 3 40 Shared Lane Traffic (%) Lane Group Flow (vph) 0 58 500000 3 700 6 40 Enter Blocked Intersection No No No No No No No No No No No No Lane Alignment Left Left Right Left Left Right Left Left Right Left Left Right Median Width(ft) 0 0 0 0 Link Offset(ft) 0 0 0 0 Crosswalk Width(ft) 16 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 15 9 15 9 Sign Control Free Free Stop Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 31.1% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 6: Main Street & Curtis Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 12 Intersection Int Delay, s/veh 1.9 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations T r a f f i c V o l , v e h / h 7 5 1 6400003 3 1 2 7 3 10 F u t u r e V o l , v e h / h 7 5 1 6400003 3 1 2 7 3 10 C o n f l i c t i n g P e d s , # / h r 000000000000 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length - ----------- Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90 H e a v y V e h i c l e s , % 222222222222 M v m t F l o w 8 5 7 3400003 3 4 3 0 3 40 Major/Minor Major1 Minor1 Minor2 Conflicting Flow All 0 0 0 - 591 289 304 593 - Stage 1 - - - - 591 - 0 0 - Stage 2 - - - - 0 - 304 593 - Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 - C r i t i c a l H d w y S t g 1 --- - 5 . 5 4---- Critical Hdwy Stg 2 - - - - - - 6.54 5.54 - Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 - Pot Cap-1 Maneuver - - - 0 418 708 625 417 0 Stage 1 - - - 0 493 - - - 0 Stage 2 - - - 0 - - 681 492 0 Platoon blocked, % - - Mov Cap-1 Maneuver - - - - 418 708 591 417 - Mov Cap-2 Maneuver - - - - 418 - 591 417 - Stage 1 - - - - 493 - - - - Stage 2 - - - - - - 643 492 - Approach EB NB SB HCM Ctrl Dly, s/v 10.7 13.6 HCM LOS B B Minor Lane/Major Mvmt NBLn1 EBL EBT EBR SBLn1 Capacity (veh/h) 667 - - - 483 HCM Lane V/C Ratio 0.057 - - - 0.133 HCM Ctrl Dly (s/v) 10.7 - - - 13.6 HCM Lane LOS B - - - B HCM 95th %tile Q (veh) 0.2 - - - 0.5 Lanes, Volumes, Timings Build (2028) AM 11: Hedge Street & Access A Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 13 Lane Group EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Volume (vph) 9 22 57 46 138 12 Future Volume (vph) 9 22 57 46 138 12 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 Frt 0.905 0.989 Flt Protected 0.986 0.973 Satd. Flow (prot) 1662 0 0 1812 1842 0 Flt Permitted 0.986 0.973 Satd. Flow (perm) 1662 0 0 1812 1842 0 Link Speed (mph) 25 25 25 Link Distance (ft) 1169 312 256 Travel Time (s) 31.9 8.5 7.0 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 10 24 63 51 153 13 Shared Lane Traffic (%) Lane Group Flow (vph) 34 0 0 114 166 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 12 0 0 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 15 9 15 9 Sign Control Stop Free Free Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 26.9% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 11: Hedge Street & Access A Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 14 Intersection Int Delay, s/veh 2.6 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 9 22 57 46 138 12 Future Vol, veh/h 9 22 57 46 138 12 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 ----- Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 10 24 63 51 153 13 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 337 160 166 0 - 0 Stage 1 160 ----- Stage 2 177 ----- Critical Hdwy 6.42 6.22 4.12 - - - C r i t i c a l H d w y S t g 1 5 . 4 2----- C r i t i c a l H d w y S t g 2 5 . 4 2----- Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 658 885 1412 - - - Stage 1 869 ----- Stage 2 854 ----- Platoon blocked, % - - - Mov Cap-1 Maneuver 628 885 1412 - - - Mov Cap-2 Maneuver 628 ----- Stage 1 829 ----- Stage 2 854 ----- Approach EB NB SB HCM Ctrl Dly, s/v 9.8 4.2 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1412 - 791 - - HCM Lane V/C Ratio 0.045 - 0.044 - - HCM Ctrl Dly (s/v) 7.7 0 9.8 - - HCM Lane LOS A A A - - HCM 95th %tile Q (veh) 0.1 - 0.1 - - Lanes, Volumes, Timings Build (2028) AM 18: Access B & College Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 15 Lane Group EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Volume (vph) 0 0 8 606 31 0 Future Volume (vph) 0 0 8 606 31 0 Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 Lane Util. Factor 1.00 1.00 0.95 0.95 1.00 1.00 Frt Flt Protected 0.999 0.950 Satd. Flow (prot) 0 0 0 3536 1770 0 Flt Permitted 0.999 0.950 Satd. Flow (perm) 0 0 0 3536 1770 0 Link Speed (mph) 25 25 25 Link Distance (ft) 313 100 1023 Travel Time (s) 8.5 2.7 27.9 Peak Hour Factor 0.90 0.90 0.90 0.90 0.90 0.90 Adj. Flow (vph) 0 0 9 673 34 0 Shared Lane Traffic (%) Lane Group Flow (vph) 0 0 0 682 34 0 Enter Blocked Intersection No No No No No No Lane Alignment Left Right Left Left Left Right Median Width(ft) 0 0 12 Link Offset(ft) 0 0 0 Crosswalk Width(ft) 16 16 16 Two way Left Turn Lane Headway Factor 1.00 1.00 1.00 1.00 1.00 1.00 Turning Speed (mph) 9 15 15 9 Sign Control Free Free Stop Intersection Summary Area Type: Other Control Type: Unsignalized Intersection Capacity Utilization 27.0% ICU Level of Service A Analysis Period (min) 15 HCM 6th TWSC Build (2028) AM 18: Access B & College Street Burdette North TIS 10/16/2025 Synchro 12 Report Impact Designs, Inc. Page 16 Intersection Int Delay, s/veh 0.5 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 0 0 8 606 31 0 Future Vol, veh/h 0 0 8 606 31 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 0 9 673 34 0 Major/Minor Major2 Minor1 Conflicting Flow All 0 0 355 - Stage 1 - - 0 - Stage 2 - - 355 - Critical Hdwy 4.14 - 6.84 - C r i t i c a l H d w y S t g 1 ---- Critical Hdwy Stg 2 - - 5.84 - Follow-up Hdwy 2.22 - 3.52 - Pot Cap-1 Maneuver - - 617 0 Stage 1 - - - 0 Stage 2 - - 681 0 Platoon blocked, % - Mov Cap-1 Maneuver - - 617 - Mov Cap-2 Maneuver - - 617 - Stage 1 ---- Stage 2 - - 681 - Approach WB NB HCM Ctrl Dly, s/v 11.2 HCM LOS B Minor Lane/Major Mvmt NBLn1 WBL WBT Capacity (veh/h) 617 - - HCM Lane V/C Ratio 0.056 - - HCM Ctrl Dly (s/v) 11.2 - - HCM Lane LOS B - - HCM 95th %tile Q (veh) 0.2 - - APPENDIX D SIMTRAFFIC ANALYSIS REPORTS Queuing and Blocking Report Existing (2025) AM 10/16/2025 11 - EX AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 1 Intersection: 1: NE Main Street (SC 417) & College Street Movement EB WB NB NB SB SB Directions Served LTR LTR L TR L TR Maximum Queue (ft) 61 360 31 317 150 329 Average Queue (ft) 31 312 3 132 36 165 95th Queue (ft) 45 419 16 258 91 283 Link Distance (ft) 16 341 507 1225 Upstream Blk Time (%) 48 26 Queuing Penalty (veh) 83 120 Storage Bay Dist (ft) 125 125 Storage Blk Time (%) 10 14 Queuing Penalty (veh) 1 8 Intersection: 2: NE Main Street (SC 417) & Curtis Street Movement EB WB NB NB SB SB Directions Served LTR LTR L TR L TR Maximum Queue (ft) 62 334 67 327 115 175 Average Queue (ft) 31 282 15 158 46 64 95th Queue (ft) 45 392 55 279 90 134 Link Distance (ft) 13 309 1047 507 Upstream Blk Time (%) 54 13 Queuing Penalty (veh) 124 53 Storage Bay Dist (ft) 150 150 Storage Blk Time (%) 9 0 1 Queuing Penalty (veh) 2 0 1 Intersection: 3: Hedge Street & College Street Movement EB WB NB Directions Served TR LT LR Maximum Queue (ft) 15 555 292 Average Queue (ft) 1 245 140 95th Queue (ft) 9 681 412 Link Distance (ft) 341 1137 508 Upstream Blk Time (%) 2 4 Queuing Penalty (veh) 0 3 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report Existing (2025) AM 10/16/2025 11 - EX AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 2 Intersection: 4: Hedge Street & Curtis Street Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 194 872 352 225 Average Queue (ft) 89 421 139 114 95th Queue (ft) 167 1018 308 198 Link Distance (ft) 309 1185 990 508 Upstream Blk Time (%) 1 6 Queuing Penalty (veh) 2 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Main Street & College Street Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 209 26 36 57 Average Queue (ft) 83 2 8 18 95th Queue (ft) 177 13 29 65 Link Distance (ft) 1053 16 506 1230 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 6: Main Street & Curtis Street Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 326 30 138 81 Average Queue (ft) 138 2 44 21 95th Queue (ft) 296 15 135 85 Link Distance (ft) 1159 13 988 506 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 398 Queuing and Blocking Report Existing (2025) PM 10/16/2025 12 - EX PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 1 Intersection: 1: NE Main Street (SC 417) & College Street Movement EB WB NB NB SB SB Directions Served LTR LTR L TR L TR Maximum Queue (ft) 67 355 43 208 224 783 Average Queue (ft) 32 238 7 85 59 265 95th Queue (ft) 48 382 29 165 146 766 Link Distance (ft) 16 341 507 1225 Upstream Blk Time (%) 70 13 8 Queuing Penalty (veh) 166 36 0 Storage Bay Dist (ft) 125 125 Storage Blk Time (%) 3 0 21 Queuing Penalty (veh) 0 2 25 Intersection: 2: NE Main Street (SC 417) & Curtis Street Movement EB WB NB NB SB SB Directions Served LTR LTR L TR L TR Maximum Queue (ft) 46 334 154 375 184 202 Average Queue (ft) 30 299 30 183 75 81 95th Queue (ft) 39 381 109 321 150 167 Link Distance (ft) 13 309 1047 507 Upstream Blk Time (%) 72 39 Queuing Penalty (veh) 207 111 Storage Bay Dist (ft) 150 150 Storage Blk Time (%) 12 1 1 Queuing Penalty (veh) 5 7 2 Intersection: 3: Hedge Street & College Street Movement EB WB NB Directions Served TR LT LR Maximum Queue (ft) 15 529 139 Average Queue (ft) 1 93 35 95th Queue (ft) 7 476 91 Link Distance (ft) 341 1137 508 Upstream Blk Time (%) 3 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report Existing (2025) PM 10/16/2025 12 - EX PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 2 Intersection: 4: Hedge Street & Curtis Street Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 272 810 440 258 Average Queue (ft) 130 423 183 117 95th Queue (ft) 232 903 418 214 Link Distance (ft) 309 1185 990 508 Upstream Blk Time (%) 0 2 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Main Street & College Street Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 792 31 161 783 Average Queue (ft) 512 5 67 423 95th Queue (ft) 961 21 175 835 Link Distance (ft) 1053 16 506 1230 Upstream Blk Time (%) 5 11 Queuing Penalty (veh) 0 22 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 6: Main Street & Curtis Street Movement EB WB NB SB Directions Served LTR LTR LTR LTR Maximum Queue (ft) 1193 30 694 488 Average Queue (ft) 949 4 358 332 95th Queue (ft) 1424 21 702 554 Link Distance (ft) 1159 13 988 506 Upstream Blk Time (%) 44 0 0 13 Queuing Penalty (veh) 0102 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 587 Queuing and Blocking Report No-Build (2028) AM 10/16/2025 21 - NB AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 1 Intersection: 1: NE Main Street (SC 417) & College Street Movement WB WB NB NB SB Directions Served LT TR L T TR Maximum Queue (ft) 372 380 67 219 390 Average Queue (ft) 335 343 20 83 212 95th Queue (ft) 412 406 53 175 336 Link Distance (ft) 342 342 532 1213 Upstream Blk Time (%) 37 43 Queuing Penalty (veh) 167 194 Storage Bay Dist (ft) 150 Storage Blk Time (%) 1 Queuing Penalty (veh) 0 Intersection: 2: NE Main Street (SC 417) & Curtis Street Movement EB EB NB SB SB Directions Served LT TR TR L T Maximum Queue (ft) 38 46 259 123 99 Average Queue (ft) 24 29 89 48 29 95th Queue (ft) 31 38 192 91 77 Link Distance (ft) 10 10 1035 532 Upstream Blk Time (%) 82 81 Queuing Penalty (veh) 174 172 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Hedge Street & College Street Movement WB WB NB Directions Served LT T L Maximum Queue (ft) 854 834 167 Average Queue (ft) 447 440 51 95th Queue (ft) 1042 1022 172 Link Distance (ft) 1136 1136 531 Upstream Blk Time (%) 8 9 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report No-Build (2028) AM 10/16/2025 21 - NB AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 2 Intersection: 4: Hedge Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 100 105 216 322 Average Queue (ft) 34 42 88 144 95th Queue (ft) 75 88 171 265 Link Distance (ft) 307 307 978 531 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Main Street & College Street Movement WB WB NB SB Directions Served LT TR LT TR Maximum Queue (ft) 7 8 56 40 Average Queue (ft) 0 0 21 17 95th Queue (ft) 5 5 49 44 Link Distance (ft) 17 17 530 1219 Upstream Blk Time (%) 0 Queuing Penalty (veh) 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 6: Main Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 1186 1190 658 205 Average Queue (ft) 947 936 338 86 95th Queue (ft) 1423 1424 661 255 Link Distance (ft) 1155 1155 976 530 Upstream Blk Time (%) 50 49 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 709 Queuing and Blocking Report No-Build (2028) PM 10/16/2025 22 - NB PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 1 Intersection: 1: NE Main Street (SC 417) & College Street Movement WB WB NB NB SB Directions Served LT TR L T TR Maximum Queue (ft) 364 370 223 480 1245 Average Queue (ft) 334 256 116 200 782 95th Queue (ft) 407 489 267 545 1573 Link Distance (ft) 342 342 532 1213 Upstream Blk Time (%) 74 39 21 47 Queuing Penalty (veh) 222 115 106 0 Storage Bay Dist (ft) 150 Storage Blk Time (%) 40 5 Queuing Penalty (veh) 201 3 Intersection: 2: NE Main Street (SC 417) & Curtis Street Movement EB EB NB SB SB Directions Served LT TR TR L T Maximum Queue (ft) 32 53 906 229 118 Average Queue (ft) 22 29 403 59 20 95th Queue (ft) 31 39 1060 171 76 Link Distance (ft) 10 10 1035 532 Upstream Blk Time (%) 84 79 22 Queuing Penalty (veh) 235 222 0 Storage Bay Dist (ft) 225 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 2 0 Intersection: 3: Hedge Street & College Street Movement WB WB NB Directions Served LT T L Maximum Queue (ft) 1158 1164 183 Average Queue (ft) 765 757 58 95th Queue (ft) 1539 1540 167 Link Distance (ft) 1136 1136 531 Upstream Blk Time (%) 53 52 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report No-Build (2028) PM 10/16/2025 22 - NB PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 2 Intersection: 4: Hedge Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 153 156 293 173 Average Queue (ft) 42 53 118 44 95th Queue (ft) 114 132 216 133 Link Distance (ft) 307 307 978 531 Upstream Blk Time (%) Queuing Penalty (veh) Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Main Street & College Street Movement WB WB NB SB Directions Served LT TR LT TR Maximum Queue (ft) 34 9 53 507 Average Queue (ft) 14 0 23 190 95th Queue (ft) 33 5 49 550 Link Distance (ft) 17 17 530 1219 Upstream Blk Time (%) 61 0 Queuing Penalty (veh) 156 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 6: Main Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 1193 1195 778 536 Average Queue (ft) 1090 1083 476 462 95th Queue (ft) 1381 1386 821 665 Link Distance (ft) 1155 1155 976 530 Upstream Blk Time (%) 76 75 0 65 Queuing Penalty (veh) 0 0 0 48 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1310 Queuing and Blocking Report Build (2028) AM 10/16/2025 31 - BLD AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 1 Intersection: 1: NE Main Street (SC 417) & College Street Movement WB WB NB NB SB Directions Served LT TR L T TR Maximum Queue (ft) 265 269 93 213 383 Average Queue (ft) 225 230 22 75 201 95th Queue (ft) 331 339 62 167 361 Link Distance (ft) 244 244 532 1213 Upstream Blk Time (%) 32 39 Queuing Penalty (veh) 153 183 Storage Bay Dist (ft) 150 Storage Blk Time (%) 1 Queuing Penalty (veh) 0 Intersection: 2: NE Main Street (SC 417) & Curtis Street Movement EB EB NB SB SB Directions Served LT TR TR L T Maximum Queue (ft) 38 47 235 103 102 Average Queue (ft) 24 29 80 44 28 95th Queue (ft) 33 37 171 81 79 Link Distance (ft) 10 10 1035 532 Upstream Blk Time (%) 83 82 Queuing Penalty (veh) 178 176 Storage Bay Dist (ft) 225 Storage Blk Time (%) Queuing Penalty (veh) Intersection: 3: Hedge Street & College Street Movement WB WB NB Directions Served LT T L Maximum Queue (ft) 1127 1122 197 Average Queue (ft) 800 797 121 95th Queue (ft) 1479 1468 249 Link Distance (ft) 1136 1136 203 Upstream Blk Time (%) 41 42 37 Queuing Penalty (veh) 0 0 15 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report Build (2028) AM 10/16/2025 31 - BLD AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 2 Intersection: 4: Hedge Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 112 121 513 260 Average Queue (ft) 38 45 156 123 95th Queue (ft) 95 98 501 234 Link Distance (ft) 307 307 978 273 Upstream Blk Time (%) 3 1 Queuing Penalty (veh) 0 1 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Main Street & College Street Movement WB WB NB SB Directions Served LT TR LT TR Maximum Queue (ft) 9 3 61 43 Average Queue (ft) 0 0 18 17 95th Queue (ft) 5 0 47 44 Link Distance (ft) 17 17 530 1219 Upstream Blk Time (%) 0 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 6: Main Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 1185 1195 722 140 Average Queue (ft) 1009 998 388 55 95th Queue (ft) 1433 1434 733 189 Link Distance (ft) 1155 1155 976 530 Upstream Blk Time (%) 59 58 0 Queuing Penalty (veh) 0 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report Build (2028) AM 10/16/2025 31 - BLD AM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 3 Intersection: 11: Hedge Street & Access A Movement EB NB SB Directions Served LR LT TR Maximum Queue (ft) 160 188 26 Average Queue (ft) 44 71 1 95th Queue (ft) 148 238 23 Link Distance (ft) 1140 273 203 Upstream Blk Time (%) 13 0 Queuing Penalty (veh) 7 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 18: Access B & College Street Movement WB WB NB Directions Served LT T L Maximum Queue (ft) 60 69 98 Average Queue (ft) 42 48 30 95th Queue (ft) 77 75 88 Link Distance (ft) 41 41 1004 Upstream Blk Time (%) 28 37 Queuing Penalty (veh) 131 172 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1015 Queuing and Blocking Report Build (2028) AM 10/16/2025 32 - BLD PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 1 Intersection: 1: NE Main Street (SC 417) & College Street Movement WB WB NB NB SB Directions Served LT TR L T TR Maximum Queue (ft) 253 273 223 538 1235 Average Queue (ft) 245 171 121 239 886 95th Queue (ft) 252 358 272 618 1594 Link Distance (ft) 243 243 532 1213 Upstream Blk Time (%) 86 42 33 57 Queuing Penalty (veh) 274 135 167 0 Storage Bay Dist (ft) 150 Storage Blk Time (%) 44 9 Queuing Penalty (veh) 221 5 Intersection: 2: NE Main Street (SC 417) & Curtis Street Movement EB EB NB SB SB Directions Served LT TR TR L T Maximum Queue (ft) 33 42 1050 237 161 Average Queue (ft) 21 25 439 50 16 95th Queue (ft) 32 43 1121 165 91 Link Distance (ft) 10 10 1035 532 Upstream Blk Time (%) 88 68 28 0 Queuing Penalty (veh) 251 194 0 0 Storage Bay Dist (ft) 225 Storage Blk Time (%) 0 0 Queuing Penalty (veh) 2 1 Intersection: 3: Hedge Street & College Street Movement WB WB NB Directions Served LT T L Maximum Queue (ft) 1160 1159 198 Average Queue (ft) 812 797 102 95th Queue (ft) 1499 1507 226 Link Distance (ft) 1136 1136 203 Upstream Blk Time (%) 56 55 25 Queuing Penalty (veh) 0 0 14 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report Build (2028) AM 10/16/2025 32 - BLD PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 2 Intersection: 4: Hedge Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 177 186 365 185 Average Queue (ft) 52 60 153 48 95th Queue (ft) 137 153 377 131 Link Distance (ft) 307 307 978 273 Upstream Blk Time (%) 2 0 Queuing Penalty (veh) 0 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 5: Main Street & College Street Movement WB WB NB SB Directions Served LT TR LT TR Maximum Queue (ft) 36 3 60 613 Average Queue (ft) 16 0 23 231 95th Queue (ft) 37 3 50 620 Link Distance (ft) 17 17 530 1219 Upstream Blk Time (%) 68 0 Queuing Penalty (veh) 177 0 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 6: Main Street & Curtis Street Movement EB EB NB SB Directions Served LT TR TR LT Maximum Queue (ft) 1186 1188 790 538 Average Queue (ft) 1107 1101 465 472 95th Queue (ft) 1345 1351 837 655 Link Distance (ft) 1155 1155 976 530 Upstream Blk Time (%) 80 78 71 Queuing Penalty (veh) 0 0 52 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Queuing and Blocking Report Build (2028) AM 10/16/2025 32 - BLD PM Burdette North TIS SimTraffic Report Impact Designs, Inc. Page 3 Intersection: 11: Hedge Street & Access A Movement EB NB Directions Served LR LT Maximum Queue (ft) 91 179 Average Queue (ft) 26 36 95th Queue (ft) 75 159 Link Distance (ft) 1140 273 Upstream Blk Time (%) 4 Queuing Penalty (veh) 4 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Intersection: 18: Access B & College Street Movement WB WB NB Directions Served LT T L Maximum Queue (ft) 60 66 506 Average Queue (ft) 47 33 214 95th Queue (ft) 59 76 516 Link Distance (ft) 42 42 1003 Upstream Blk Time (%) 85 42 Queuing Penalty (veh) 260 128 Storage Bay Dist (ft) Storage Blk Time (%) Queuing Penalty (veh) Network Summary Network wide Queuing Penalty: 1886 AP PENDIX E BACKGROUND IMPROVEMENTS 1 DEVELOPMENT AGREEMENT FOR BURDETTE NORTH DISTRICT REDEVLOPMENT PROJECT THIS DEVELOPMENT AGREEMENT FOR BURDETTE NORTH DISTRICT REDEVELOPMENT PROJECT (the “Agreement”) is effective _____________, 2025 (“Effective Date”), between CITY OF SIMPSONVILLE, SOUTH CAROLINA, a body corporate and politic (the “City”) of the State of South Carolina, and BLUE RIDGE LAND HOLDINGS, LLC, a South Carolina limited liability company (“Developer”). City and Developer are each a “Party,” and collectively, the “Parties.” RECITALS: WHEREAS, the Parties entered into a Purchase and Sale Agreement effective as of August 20, 2021, as amended by (i) Amendment to Purchase and Sale Agreement dated April 25, 2023, (ii) Second Amendment to Purchase and Sale Agreement dated November 21, 2024, (iii) Third Amendment to Purchase and Sale Agreement dated December 31, 2024, and (iv) Fourth Amendment to Purchase and Sale Agreement dated April 22, 2025 (the “PSA”) whereby the Developer will purchase certain property from the City identified on Exhibit A attached hereto and made a part hereof (the “City Property”) from the City; and, WHEREAS, Developer is the owner of that certain property adjacent to the City Property being more particularly described on Exhibit B attached hereto and made a part hereof (the “Former Bank Property”, and together with the City Property, the “Developer Property”); and, WHEREAS, the Parties intend to cooperate to redevelop parcels of land more particularly described herein in the City of Simpsonville to create a privately -owned mixed-use development as set forth below; and, WHEREAS, the Parties intend for the Burdette North District Redevelopment (defined in Section 5A below) to (i) create capital investment and full -time employment in the City’s municipal limits, (ii) maximize public benefit and minimize public investment, (iii) provide business -urban district housing, provide for additional public benefit, (iv) respect existing City fabric such as height limits, historic buildings, design aesthetics, etc., and (v) provide for establishment of integrated site plans, urban des ign elements, land uses, architecture, site engineering, and landscape architecture, all while respecting the Simpsonville Comprehensive Plan: 2040 as it relates to land use; and, WHEREAS, in exchange for providing these benefits to the City, Developer desires to receive the assurance that it may proceed with the development of the Developer Property (defined below) in accordance with and subject to any and all existing City development regulations and conditions of approval of the City as they exist on the effective date of the Rezoning (defined in Section 2 below), subject to the terms, conditions, and exceptions contained herein and subject to periodic potential amendments to this Agreement made in accordance with this Agreement. WHEREAS, Developer intends to develop the improvements set forth below on the Developer Property pursuant to a rezoning of the Developer Property to the Innovative Development District designation (See Section 2.11 of the City of Simpsonville Zoning Ordinance “Zoning Ordinance”), which requires, among other things, City approval of a concept plan and master site plan pursuant to the terms of Section 2.11, the terms and conditions of which are incorporated herein as if set forth fully. NOW, THEREFORE , in consideration and mutual dependence on the factual representations 2 contained in this Agreement, the Recitals set forth hereinabove, each Party’s expending funds to complete their respective portions of the Development, and in reliance on each Party’s exchange of promises as contained in this Agreement, the Parties agree as follows: 1. City’s Approval of Agreement: The terms and conditions of this Agreement have undergone extensive review by City Council (the “Council”) and Council has determined this Agreement to be fair, just, reasonable, and in the best interests of the City. After careful review and deliberation, the Council has determined and concluded that the Agreement meets the goals and needs of the City and complies with all statutory requirements. On __________, 2025, the Council considered and approved this Agreement by ordinance and authorized the City’s execution of the same. The approval of this Agreement constitutes a legislative act of the Council. 2. Rezoning of Developer Property. In order for Developer to undertake the Project, City and Developer acknowledge the Developer Property must be rezoned from its current Business Urban zoning classification to the Innovative Development District (ID) zoning classification (the “Rezoning”) as set forth under Section 2.11 of the City’s zoning ordinance (the “Zoning Ordinance”) in effect as of the Effective Date. The terms of Section 2.11 of the Zoning Ordinance are hereby incorporated into the terms of this Agreement. To effectuate such Rezoning, Developer agrees to submit appropriate and applicabl e documentation to request the Rezoning of the Property as soon as reasonably possible upon receipt of the fully effective Agreement. City agrees to use its reasonable best efforts to assist Developer in obtaining the Rezoning. This Agreement shall termina te automatically in the event the Rezoning of the Developer Property is not obtained. In the event Developer does not obtain the Rezoning of the Property, Developer shall have the right in its complete and sole discretion to either (i) terminate the PSA by delivery of written notice to City prior to the Closing Date set forth in the PSA, or (ii) waive such right and complete the acquisition of the City Property. 3. Expansion of Developer Property. Developer is attempting to acquire, lease or otherwise control some or all of the property currently owned by Secured Advantage Credit Union being more particularly described on Exhibit C attached hereto and made a part hereof (the “Credit Union Property”), to be utilized as part of the Project. In the event that Developer is able to accomplish the same, the portion of the Credit Union Property, Developer either acquires or leases shall become part of the Developer Property. The Parties shall thereafter amend this Agreement to include the Credit Union Property as part of the Developer Property. 4. SC Mill Tax Credits. Developer may elect to undertake appropriate actions with Greenville County in order to request and obtain a satisfactory resolution and a subsequent ordinance confirming that tax credits under the South Carolina Textiles Communities Revitalization Act, Section 12-67-140, et. seq., of the South Carolina Codes of Laws (the “Mill Tax Credits”), shall be applicable and available with respect to all or a portion of the Developer Property. City agrees to use its reasonable best efforts to assist Developer in obtaining the Mill Tax Credits. 5. Developer Commitments and Benefits. A. Development on Developer Property. Developer shall acquire the City Property from the City subject to the terms of the PSA. Developer shall design, develop, construct, furnish, and do all other things necessary to redevelop, construct and operate on the Developer Property (i) up to one hundred twenty five (125) apartment units with related amenities for tenants of the apartments, (ii) up to 25,000 square feet of retail, restaurant or office space; and (iii) a surface parking lot with parking to accommo date the development with vehicular and pedestrian access to and from all improvements (collectively the “Project” 3 or “Burdette North District Redevelopment”) in compliance with all requirements set forth in Section 4.5 of the Simpsonville Zoning Ordinance, the approved Concept Plan/Statement of Intent, and DO -TC 2.12, Design Overlay-Town Center District, as preliminarily illustrated in the drawing attached hereto as Exhibit D (the “Project Facilities”) and as will be fully described on the Master Site Plan approved by Council as part of the Rezoning. The Project shall be constructed according to the Construction Schedule attached hereto as Exhibit E (the “Construction Schedule”), which may be adjusted based upon the Construction Commencement Date defined below. Developer shall use its reasonable best efforts to achieve substantial completion of the Project by June 30, 2028. For purposes of this Agreement, “substantial completion” means that the buildings and improvements for the Project Facilities are sufficiently complete so that it can be utilized for their intended use. Developer shall commence site demolition, grading, and construction after it acquires the City Property pursuant to the PSA and as soon as reasonably possible upon receipt of applicable permits and approvals after Developer acquires the City Property from the City (“Construction Commencement Date”). The Construction Commencement Date and the dates provided on the Construction Schedule are each a “Benchmark Date” and Developer’s failure to comply with the same is enforceable against the Developer as set forth in Section 6(F) hereof. B. Design Considerations. At a minimum, Developer shall design all improvements on the Developer Property in compliance with City’s Building & Development Standards in the Zoning Ordinance, including Section 2.11 of the Zoning Ordinance, and must receive all required approvals by City’s Department of Building & Development Standards prior to commencing each phase of construction. Developer shall submit the design of the buildings on the Developer Property to be approved by City Planning Staff subject to the plans approved by Council. . Developer shall design and construct the Project Facility on Developer’s Property of a scale and using materials to be complementary of public improvements and to be compatible with existing downtown buildings and other downtown development. C. Compliance with Building, Zoning, and Environmental Laws. Subject to the Rezoning necessary in order for Developer to develop the Project Facilities as described in this Agreement, including without limitation, waiver of setback lines and height restrictions for the Developer Property, Developer shall construct and develop the Project Facilities according to all applicable federal, state, and local laws, rules, orders, ordinances, regulations, and legal requirements of all governmental entities, agencie s, or instrumentalities relating to the development, use, or condition of Developer Property, including, without limitation, all building code, zoning requirements, and environmental regulations then in effect at the latter of the time applicable permits are issued and a certificate of occupancy is issued. At the completion of each phase or component of the Project Facilities, Developer shall ensure the use and operation of each phase or component of the Project Facilities is according to all applicable federal, state, and local laws, as amended for the Project Facilities. Developer shall (i) ensure construction is performed in a manner that does not cause any damage to existing land, or improvements and (ii) at City’s option, promptly repair any damage that may occur. D. General Construction Requirements. The Developer is responsible for the following items during all construction phases: a. Cleanliness to include entire worksite area (including, for example, dust control, garbage, construction debris, loose and blowing materials); b. Damage to existing on -site utilities, including, for example, water, sewer, storm water, communication, electricity, and gas; c. Parking for construction employees, material lay- down area, location for construction material dumpsters; 4 d. Coordination with existing businesses and residents regarding noise, displaced parkers, after-hours construction, concrete pours, blasting, disruption of vehicle and pedestrian access; and E. Additional Developer Benefits . The general benefits to be received by Developer from the implementation of the Development, in addition to certain matters set forth above, include without limitation: a. Realization of the opportunity to implement the Development plan for a mixed use development that is consistent with City’s and the Developer’s goals and needs; b. Integration of site plans, urban design elements, land uses, architecture, site engineering, landscape architecture, and mitigation measures over the entire Project; c. Security provided by certain City ordinances, standards, policies, and guidelines to achieve the Project; d. Participation by the City to achieve the public benefits necessary for the Project; and e. In exchange for providing the within benefits to the City, the Developer desires to receive the assurance that it may proceed with the Project in accordance with any and all existing City development regulations and conditions of approval of the City as they exist on the Effective Date, subject to the terms, conditions, and exceptions contained herein and subject to periodic potential amendments to this Agreement made in accordance with this Agreement. 6. City Commitments A. Rezoning. The City acknowledges that a condition to Developer’s obligations herein is that the Developer receive the Rezoning so that Developer can develop the Project Facilities as described in this Agreement. B. Streetscape Improvements. City agrees to use its reasonable best efforts to complete the streetscape and other public improvements planned for the area contiguous and adjacent to the Developer Property which are set forth on Exhibit F attached hereto and made a part hereof (the “Streetscape Improvements”) at its expense prior to Developer’s completion of the Project. C. Undergrounding Utilities. Prior to Developer’s completion of construction of Project Facilities, City agrees to use its reasonable best efforts to either complete, or facilitate the completion with Duke Energy, of the undergrounding utilities along College Street and Main Street in front of the Developer Property at no expense to Developer. D. Street Narrowing. City shall use it reasonable best efforts to cause the portion of Hedge Street that is contiguous to the Developer Property shown and depicted on the drawing attached hereto as Exhibit G to be narrowed to allow for additional parking on the Developer Property at no expense to Developer. E. Permitting. To the extent permitted by law and for those items under City control, the City shall attempt to expedite the processing, approval, and permitting of drawings, plats, plans, applications, and other items for and pertaining to all phases of the Project. F. Benchmark Dates. If Developer fails to accomplish any required task by that required task’s applicable benchmark date, then, in addition to any other remedy provided under this Agreement, City may delay its performance of any obligation under this Agreement for a similar period. 7. Design and Construction Processes 5 A. Designated Contact. Immediately following this Agreement’s execution, City and Developer shall each designate a senior -level contact to represent that Party (each a “Designated Contact”). Designated Contacts shall address, without delay, issues related to scheduling, traffic control, utility coordination, and a process for reviewing and revising plans and specifications. Each Party shall provide that Party’s communications through that Party’s Designated Contact. B. Pre- and During Construction. Prior to preparing any plans or specifications, and through the construction process, the City and Developer shall confer on the needs, preferences, and expectations each Party has for its respective project and as much as possible achieve common goals as to how to achieve those goals. The process Parties outline in this subsection is in addition to and not in lieu of all approval and permitting processes applicable to all persons and entities developing projects in city limits. 8. Bonds and Insurance A. Insurance. During construction, the Developer shall obtain and maintain, or cause to be obtained and maintained, at all times one or more policies of insurance containing the following types of coverage, deductibles, limits, and other terms acceptable to the City, in its sole discretion: a. Builders Risk. Comprehensive builders’ risk, casualty, and property insurance against any casualty on an “all risk” perils basis. This policy must include fire, extended coverage, vandalism, and malicious mischief. b. General Liability. Commercial general liability insurance covering the defense and legal liability claims of bodily injury, death and property damage which occurs on, in or about or relating to the Developer Property regardless of the cause of the same. This policy must have not less than $3,000,000 combined single limits per occurrence/aggregate for bodily injury or property damage, provided by a Commercial General Liability policy or combination of General Liability and Umbrella Liability limits. c. Workers Compensation. Workers Compensation and Occupational Disease insurance meeting the State’s statutory requirements, including employer’s liability in an amount not less than $1,000,000. d. Motor Vehicle. Motor vehicle covering all owned, non-owned and hired automobiles of not less than $1,000,000 combined single -limits per each occurrence/aggregate for liability, bodily injury, and property damage. e. Miscellaneous. Insurance this Agreement requires must be effected under standard form policies issued by insurers of recognized responsibility authorized to do business in South Carolina which are rated at least Class A/VIII, Best Rating Services. The policies must be non-assessable and shall contain language to the effect that (i) any loss shall be payable notwithstanding any act of negligence, (ii) the policies are primary and noncontributing with insurance on which additional insured’s are listed as name d insured’s, and (iii) the insurer is not entitled to initiate cancellation, material limitation or non -renewal except after 30 days’ written notice for cancellation due to non- payment of premium) by the insurer to the Developer and City. The policies must include waivers of all rights of subrogation against the Developer, City and their respective elected officials, officers, agents, and employees. The policy described in subparagraphs (a) , (b) , and (d) of this section must include the City and Developer, and their respective elected officials, officers, agents, employees, subcontractors, and licensees as additional insureds to the extent allowed by law. The policy described in subparagraphs (e) of this section must include the 6 Developer as an additional insured. Each policy must contain deductibles, retentions, or both, as City, in its sole discretion, deems appropriate. 9. Damage or Destruction Prior to Substantial Completion If, at any time prior to substantial completion, the Project is damaged or destroyed by a fire or other casualty, the Developer shall commence, and proceed as promptly as possible, to repair and restore the Project Facilities so as to cause the same to ach ieve substantial completion according to approved architectural drawings as soon as practicable. 10. Cooperation Parties shall work together to correct and conform deeds, assignments, or other conveyance instruments, to reflect as-built configurations. A Party may not unreasonably withhold consent. 11. Default / Remedies A. Developer. Upon the default by the Developer in the due performance of or compliance with any of the terms hereof, City shall give Developer written notice of such default and thirty (30) days to cure such default; provided, however, that if the nature of Developer’s obligation is such that more than thirty (30) days are required for its performance, and so long as Developer has provided written notice of the precise time frame for completion, then Developer shall not be deemed in default if it shall commence such performance within thirty (30) days and thereafter diligently pursues the same to completion, and if Developer shall fail to proceed promptly to cure the same, City may: a. terminate this Agreement immediately by delivery of written notice to Developer; and, b. take whatever action at law or in equity as may appear necessary or desirable to enforce its rights under this Agreement; and, B. City. Upon the default of the City in the due performance of or compliance with any of the terms hereof, the Developer shall give the City written notice of such default and 30 days to cure such default; provided, however, that if the nature of City’s obligation is such that more than thirty (30) days are required for its performance, and so long as City has provided written notice of the precise time frame for completion, then City shall not be deemed in default if it shall commence such performance within thirty (30) days and thereafter diligently pursues the same to completion and if the City shall fail to proceed promptly to cure the same, the Developer may take whatever action at law or in equity as may appear necessary or desirable to enforce its rights under this Agreement. 12. Developer Property Restriction. In the event that Developer has both (i) acquired the City Property and (ii) entered into this Agreement with the City, Developer shall record a covenant against the Developer Property, to run with the Developer Property, that the Developer Property shall not, for a period of twenty (20) years, be transferred to, owned by, or used, by any person (legal or natural) that would result in the Developer Property, or any portion (legal or geographic), having a complete exemption from ad valorem property taxes without the written approval of the City ; provided, however, such covenant shall not preclude or prevent Developer or a subsequent owner or user of the Developer Property, or any portion thereof, from applying for and receiving the benefit of an applicable property tax classification that would reduce, lower or otherwise benefit the ad valorem property taxes applicable to the Developer Property or any portion thereof (such as, for example, (i) a fee in lieu of taxes agreement with the City or (ii) ownership by a 501(C)(3) non-profit entity). 7 13. Entire Agreement This Agreement is the entire agreement among Parties with respect to the subject matter of this Agreement. All prior documents, negotiations, and discussions merge in this Agreement and do not survive this Agreement’s execution. 14. No Oral Modification/Waiver Parties are not entitled to modify, in any way, this Agreement except by a writing signed by or on behalf of all Parties by a duly authorized representative of the executing Party. Neither any purported amendment, of any kind, to this Agreement, nor any purported waiver of any provision of this Agreement is valid unless all Parties have consented in writing. 15. Non-Assignment A Party shall not assign its rights or delegate its responsibilities under this Agreement to any third party without the prior, written consent of all Parties; provided, however, the Parties recognizes that Developer shall be permitted to assign its interest in this Agreement to an entity created for the purpose of acquiring, owning and developing the Developer Property in which Developer or its principals own(s) an interest . Notwithstanding the foregoing, the City is entitled to assign some or all of its rights or delegate some or all of its duties under this Agreement to a nonprofit corporation to effect a means of financing the City’s project costs. City is not required to obtain any further consent from any other Party beyond this Agreement’s execution for that purpose. 16. Mutual Dependency of Commitments Each Party’s commitments under this Agreement are collectively dependent, each on the other, and are subject to the condition that each Party continues to move toward completion of that Party’s projects on collectively acceptable terms and conditions of all documents contemplated by this Agreement. 17. No Third-Party Beneficiary/No Joint Venture The Parties do not intend to create any third-party beneficiary rights, nor any form of partnership, joint venture, or any other legal relationship among the Parties, except a contractual relationship as set forth in this Agreement. 18. Force Majeure Neither party shall be held responsible for delays in the performance of its obligations hereunder when caused by a Force Majeure event. In order for its performance to be excused for the period of a Force Majeure event, a party must give written notice to the other party within 10 days after the occurrence of the Force Majeure event. A Force Majeure event is any period of delay which arises from or through: Acts of God, including, without limitation, flood, earthquake, and severe weather conditions; strike s; explosion; sabotage; riot or civil commotion; act of war; fire or other casualty; legal requirements; or any other causes beyond the reasonable control of the party claiming delay from or through such causes. 19. Limitation of City’s Liability NOTWITHSTANDING ANYTHING ELSE IN THIS AGREEMENT TO THE CONTRARY , ANY CITY OBLIGATION CONTAINED IN THIS AGREEMENT, INCLUDING ANY OBLIGATION TO PAY MONEY , IS NOT A DEBT OR GENERAL OBLIGATION OF CITY , BUT RATHER IS PAYABLE SOLELY AND EXCLUSIVELY FROM ANNUALLY APPROPRIABLE REVENUES AND RECEIPTS 8 OF CITY’S GENERAL OPERATIONS. 20. No City Personnel Liability Any City obligation contained in this Agreement, including any obligation to pay money, is an obligation of the City and not an obligation of any member of the City Council or any employee, other elected official, officer, or agent of the City in either an individual or an official capacity. 21. Absence of Certain Commercial Practices Neither Developer nor any officer, member, director, employee or agent of them (nor any person acting on behalf of any of the foregoing), has given or agreed to give any gift or similar benefit, including, without limitation, any contribution, payment or expenditure, of more than normal value to any customer, supplier, City or other governmental employee or official or any other person who is or may be in a position to help or hinder the foregoing entities or assist them in connection with any actual or proposed activity described in this Agreement. 22. Governing Law; Venue The law of the State, without regard to any conflict of law provision that would direct a court to use the laws of another jurisdiction, govern this Agreement. The Parties submit to venue and jurisdiction in the state and federal courts of the State. 23. State Law Limitations Notwithstanding anything else in this Agreement to the contrary, the City’s commitments are subject to the provisions of the South Carolina Code Annotated, as well as all local laws. 24. Developer and City Responsibility. Developer, and its officers, directors and employees, agree to hold the City harmless from all claims, liabilities, damages, losses, including attorney’s fees and expenses for bodily injury, sickness or death, and property damage or destruction which may be claimed against the City due to any acts or omissions by the Developer or its officers, employees or agents related to the administration of the Project. The City is a governmental entity and political subdivision of the State of South Carolina and enjoys sovereign immunity, as well as the imposition of duties and protections afforded by the South Carolina Tort Claims Act. By law, the City cannot hold harmless any contracting party. However, subject to the application of the aforementioned law and to the limits of its insurance, the City agrees that the Developer, and its officers, directors and employees shall not be liable from and against all claims, liabilities, damages, losses, including attorney's fees and expenses for bodily injury, sickness, or death, and property damage or destruction (other than to the Work itself) related to the negligent acts or omissions by the City, and the Developer’s officers, employees, and agents. 25. Dispute Resolution. (a) In the event of a dispute arising under this Agreement, the parties agree to engage in good faith discussions to resolve the matter amicably. 9 (b) If the dispute cannot be resolved through discussions, the parties agree to participate in non-binding mediation, with a mutually agreed-upon mediator, as a condition precedent to further legal proceedings. (c) If mediation is unsuccessful, the parties agree to submit venue and jurisdiction in the state or federal courts located in County of Greenville, State of South Carolina. (d) Each party shall bear its own costs of mediation, except that the costs of the mediator or shall be shared equally . 26. Benefit of the Parties. This Agreement is intended to benefit the Parties hereto only, and therefore no third party shall have any rights under this Agreement, or be deemed a third-party beneficiary. 27. Notices. Unless specifically provided otherwise by this Agreement, any notice, demand, request, consent, approval or communication which a Party is required to or may give to another Party hereunder shall be in writing and shall be delivered or addressed to the other at the address below set forth or to such other address as such Party may from time to time direct by written notice given in the manner herein prescribed. Any written notice or written certification or payment required by the Terms of this Agreement shall be deemed given if delivered in person or mailed certified mail, return receipt requested to the persons named below. The Parties shall make reasonable inquiry to determine whether the names or titles of the persons listed in this Agreement should be substituted with the name of the listed person’s successor. If to the City: ________________________________ Attn: _Tee Coker__________________________ 425 E. Curtis Street Simpsonville, SC 29681 Email: tcoker@simpsonville.com With a copy to: Duggan & Hughes, LLC Attn: Daniel R. Hughes P.O. Box 449 Greer, SC 29652 Email: dhughes@dugganhughes.com If to Developer: Blue Ridge Land Holdings, LLC Attn: John T. Pazdan P. O. Box 8856 Greenville, SC 29604 Email: chanticleer18@gmail.com With a copy to: Belmont Sayre, LLC Attn: Kenneth M. Reiter P. O. Box 1622 Carrboro, NC 27510 Email: kreiter@belmontsayre.com 10 28. Jurisdiction. This Agreement shall be binding upon the parties hereto and governed by the laws of the State of South Carolina. 29. Counterparts. This Agreement may be executed in one or more counterparts and shall become effective when one or more counterparts have been signed by all of the Parties; each counterpart shall be deemed an original but all counterparts shall constitute a single instrument. 30. Agreement to Cooperate. In the event of any legal action instituted by a third party or other governmental entity or official challenging the validity of any provision of this Agreement, the Parties hereby agree to cooperate in defending such action; provided, however, each Party shall retain the right to pursue its own independent legal defense. 31. Severability. In the event that a court of competent jurisdiction holds that a provision or requirement of this Agreement violates any applicable law, each such provision or requirement shall be replaced with a revision which accomplishes the purposes outlined herein and shall be enforced only to the extent it is not in violation of law or is not otherwise unenforceable and all other provisions and requirements of this Agreement, not contingent thereon, shall remain in full force and effect. 34. Organization and Power. Developer represents and warrants to the City that it (i) is a limited liability company organized, validly existing, and in good standing under the laws of the State of South Carolina, (ii) has the power to engage in the transactions contemplated hereby; and (iii) has the full power, authority and legal right to execute and deliver this Agreement and other documents and to perform and observe the terms and provisions thereof. The City represents and warrants to Developer that it has the right, power and authority to execute and deliver this Agreement and to perform and observe the terms thereof. This Agreement, when executed and delivered by the parties, is a valid and binding obligation of the parties and is enforceabl e in accordance with its terms, subject to the conditions precedent set forth above. [ONE SIGNATURE PAGE AND ONE EXHIBIT FOLLOW] [REMAINDER OF PAGE SUBSTANTIVELY BLANK] 11 WHEREFORE by its signature, the City binds itself and successors in interest as of the effective date provided in this Agreement’s preamble. CITY OF SIMPSONVILLE, SOUTH CAROLINA By _____________________________________ _Paul Shewmaker, Mayor [SEAL] ATTEST: Ashley Clark, Municipal Clerk Date of Execution: _____________, 2025 [SIGNATURES CONTINUE ON THE FOLLOWING PAGE] 12 WHEREFORE by its signature, Developer binds itself and its successors in interest as of the effective date provided in this Agreement’s preamble. BLUE RIDGE LAND HOLDINGS, LLC By: John T. Pazdan, Member Date of Execution: _____________, 2025 13 EXHIBIT A DESCRIPTION OF CITY PROPERTY All that certain piece, parcel or tract of land with improvements thereon situate, lying and being in the City of Simpsonville, County of Greenville, State of South Carolina, containing 1.42 acres, more or less, bound on the north by lands now or forme rly of United Federal Savings & Loan Association and Wesley V. Harrison, on the east by Hedge Street, on the south by lands now or formerly of Hendricks Properties, Inc., and on the west by N. Main Street. This being the identical property conveyed to City of Simpsonville, a municipal corporation, by deed of Duke Power Company, dated June 6, 1996, and recorded August 13, 1996, in the Greenville County ROD Office in Deed Book 1649 at Page 1669. TMS 0315.00-02-004.00 14 EXHIBIT B DESCRIPTION OF FORMER BANK PROPERTY P arcel 1: A ll that certain piece, parcel, or lot of land, situate, lying and being in the Town of Simpsonville, County of Greenville, State of South Carolina, at the southeast corner of College and North Main Streets, and having, according to a survey made by Piedmont Engineering Service on October 2, 1951, the following metes and bounds, to-wit: B EGINNING at the southeast intersection of College and North Main Streets, and running thence with North Main Street, S. 25-23 E., 128 feet to an iron pin; thence N. 64-24 E., 100 feet to an iron pin; thence N. 25 -23 W., 129.7 feet to an iron pin on the south side of College Street; thence with the south side of College Street; thence with the south side of College Street, S. 63-36 W., 100 feet to the point of beginning. P arcel 2: A LL that lot of land, with improvements thereon, situate on the Southeastern side of College Street, Town of Simpsonville, Austin Township, Greenville County, State of South Carolina, shown as a portion of Lot No. 1, on Map No. 1, of A. R. Hunter Estate, made by W. J. Riddle, August, 1947, and having, according to said Map, the following metes and bounds, to-wit: B EGINNING at an iron pin on the Southeastern side of College Street, said point being 100.ft. in a Northeasterly direction from the point where the Northeastern side of North Main Street· intersects with the Southeastern side of College Street, and running thence with the Southeastern side of College Street, N. 63-35 E. 132 ft, to an iron pin with the line of Lot No, 4; thence S. 26-42 E., 131.5 ft. to an iron pin; thence with the line of Lot No, 2, S-64-24 W, 134 ft. to an iron pin in the joint line of Lots 1 and 2, said point being 100 ft, in a Northeasterly direction from the joint front corner of Lots 1 and 2; thence through Lot No. 1 N. 25 -23 W., 131 ft., more or less, to the beginning corner. P arcel 3: A LL that certain piece, parcel or lot of land, with all improvements thereon, containing 0.37 acres, more or less, situate, lying and being in the Town of Simpsonville, County of Greenville, State of South Carolina, located at the southwestern corner of the intersection of West Hedge Street and East College Street, and being shown on a plat entitled Survey for S & S Properties, a South Carolina General Partnership, prepared by Landrith Surveying, dated February 1, 1990, recorded in Plat Book 18- G at Page 11, and having, according to a survey entitled "Property of American Federal Bank, FSB", prepared by Freeland- Clinkscales & Associates, Inc., dated July 23, 1992, recorded in Plat Book 23-F at Page 35, the following metes and bounds, to-wit: B EGINNING at an iron pin on the southern side of College Street at the joint corner of Lots 1 and 4; thence with said College Street N 63-35-00 E 132.99 feet to an iron pin at the intersection of College Street an d Hedge Street; thence with the south-stern side of Hedge Street S 20-21-39 D 131.00 feet to an iron pin at the joint corner of Lots 2 and 4; thence with the common line of said properties S 63-08-00 W 118.47 feet to an iron pin at the joint corner of Lots 1 and 4; thence with the common line of said properties N 26-43- 23 W 131.20 feet to an iron pin, the point of BEGINNING. 15 BEING ALSO DESCRIBED AS FOLLOWS: All that certain piece, parcel or tract of land with improvements thereon situate, lying and being in the State of South Carolina, County of Greenville, City of Simpsonville, adjacent to North East Main Street, College Street and Hedge Street, identified as Lot 1 & 4, Map No. 1, A. R. Hunter Est., containing 1.069 Acres, 46,548 Sq. Ft., more or less, on a survey entitled SURVEY FOR BLUE RIDGE LAND HOLDINGS LLC, prepared by Site Design, Inc., dated March 22, 2021, and recorded May 7, 2021, in the Greenville County ROD Office in Plat Book 1397 at Page 56, reference to said survey being hereby made for a more complete metes and bounds description thereof. This being the identical property conveyed to Blue Ridge Land Holdings, LLC, a South Carolina limited liability company, by Truist Bank, a North Carolina banking corporation, by (i) warranty deed dated April 28, 2021, and recorded May 7, 2021, in the Greenville County ROD Office in Deed Book 2623 at Page 2891, and (ii) quitclaim deed dated April 28, 2021, and recorded May 7, 2021, in the Greenville County ROD Office in Deed Book 2623 at Page 2899. TMS0315.00-02-001.00 16 EXHIBIT C DESCRIPTION OF CREDIT UNION PROPERTY Tract A: ALL THAT PIECE, PARCEL OR LOT OF LAND IN SIMPSONVILLE TOWNSHIP, GREENVILLE COUNTY , STATE OF SOUTH CAROLINA, SHOWN ON PLAT OF PROPERTY ENTITLED D. L. BRAMLETT, JR., MADE BY C.O. RIDDLE, DATED AUGUST 1960 AND RECORDED IN THE ROD OFFICE FOR GREENVILLE COUNTY IN PLAT BOOK OO AT PAGE 534 AND 535, AND HA VING, ACCORDING TO SAID PLAT, THE FOLLOWING METES AND BOUNDS, TO-WIT: BEGINNING AT AN IRON PIN ON THE EASTERN SIDE OF NORTH MAIN STREET, 48.1 FEET NORTH OF THE INTERSECTION OF EAST CURTIS STREET AND RUNNING THENCE ALONG THE EASTERN SIDE OF NORTH MAIN STREET N 22 -48 W, 133.3 FEET TO AN IRON PIN AT THE CORNER OF PROPERTY THIS DAY CONVEYED TO GEO. A. WEBB; THENCE ALONG SAID PROPERTY N 70-47 E, 334.8 FEET TO AN IRON PIN ON THE WESTERN SIDE OF HEDGE STREET; THENCE ALONG SAID STREETS 15-10 E, 68.7 FEET TO AN IRON PIN A T THE CORNER OF PROPERTY NOW OR FORMERLY OF ETHEL M. HILL; THENCE S 64 -50 W ALONG THE HILL AND MAYFIELD PROPERTIES, 102 FEET TO AN IRON PIN; THENCE S 65-44 W, ALONG THE CANNON, HA YNES AND TODD PROPERTIES 75 FEET TO AN IRON PIN; THENCE S 23-56 E, 30 FEET TO AN IRON PIN; THENCE ALONG THE TOWN PROPERTY S 66-35 W, 30 FEET TO AN IRON PIN; THENCE S 23-56 E, 9 FEET TO AN IRON PIN; THENCE S 66-35 W, 19.5 FEET TO AN IRON PIN; THENCE S 23 -56 E, 3.83 FEET TO AN IRON PIN; THENCE ALONG PROPERTY OF WOOTENCORPORATION, JONES AND BRAMLETT, S 67-12 W, 99.3 FEET TO THE POINT OF BEGINNING. Tract B: ALL THAT CERTAIN PIECE, PARCEL OR LOT OF LAND IN GREENVILLE COUNTY , ST A TE OF SOUTH CAROLINA, LOCATED ON THE EASTERLY SIDE OF MAIN STREET IN THE TOWN OF SIMPSONVILLE, AND BEING DESCRIBED AS FOLLOWS: BEGINNING AT AN IRON PIN ON THE EASTERLY SIDE OF MAIN STREET IN THE TOWN OF SIMPSONVILLE AND RUNNING THENCE N 74-56 E, 172.5 FEET TO AN IRON PIN; THENCE N 75-02 E 164.6 FEET TO AN IRON PIN ON THE WESTERLY SIDE OF HEDGE STREET; THENCE WITH PROPERTY OF GRANTEE HEREIN S 70 -47 W, 334.8 FEET TO AN IRON PIN ON THE EASTERLY SIDE OF MAIN STREET; THENCE WITH THE EASTERLY SIDE OF MAIN STREET N 22-48 W, 23.75 FEET TO AN IRON PIN, THE BEGINNING CORNER. Tract C: ALL THAT CERTAIN PIECE, PARCEL OR LOT OF LAND LYING, BEING SITUATE IN THE COUNTY OF GREENVILLE, STATE OF SOUTH CAROLINA, BEING SHOWN AND DESIGNATED ON A PLAT ENTITLED "DUKE POWER COMPANY , SIMPSONVILLE BRANCH OFFICE" Page 17 of 21 DATED DECEMBER 22, 1987 AND HA VING, ACCORDING TO SAID PLA T, THE FOLLOWING METES AND BOUNDS, TO-WIT: BEGINNING AT AN IRON PIN FOUND ALONG THE EASTERN EDGE OF S. C. HIGHWAY 14 AND U.S. HIGHWAY 276 (N. MAIN STREET) JOINT CORNER OF A 1.42 ACRE TRACT AND RUNNING THENCE N 68-1-51 E, 339.23 FEET TO A PK NAIL IN ROAD ALONG THE WESTERN EDGE OF W. HEDGE STREET; THENCE RUNNING ALONG THE WESTERN EDGE OF W. HEDGE STREET 15-21-15 E, 38.00 FEET TO A PK NAIL IN ROAD ALONG THE WESTERN EDGE OF W. HEDGE STREET; RUNNING THENCE S 74 -39-45 W, 337.10 FEET TO AN IRON PIPE FOUND ALONG THE EASTERN EDGE OF S.C. HIGHWAY 14AND U.S. HIGHWAY 276 (N. MAIN STREET), THE POINT OF BEGINNING. This being the identical property conveyed to Secured Advantage Federal Credit Union by deed of Pontus Vault Portfolio, LLC dated August 28, 2024, and recorded September 20, 2024, in the Greenville County ROD Office in Deed Book 2731 at Page 2652, which deed corrects a prior deed between the parties recorded June 12, 2019, in Deed Book 2568 at Page 1149. TMS 0315.00-02-006.00 Page 18 of 21 EXHIBIT D DEPICTION OF PROJECT FACILITIES Page 19 of 21 EXHIBIT E CONSTRUCTION SCHEDULE September 30, 2025 – Developer obtains Rezoning. March 31, 2026 – Design and construction plans for the Project finalized and submitted to the City. June 1, 2026 -- Building and site construction and land disturbance permits issued. June 30, 2028 – Project construction completed and leasing commences. Residents and businesses begin to take occupancy. Page 20 of 21 EXHIBIT F STREETSCAPE IMPROVEMENTS Page 21 of 21 EXHIBIT G AREA OF HEDGE STREET TO BE NARROWED [ATTACHED ON THE FOLLOWING PAGE] Page 1 of 1 November 17, 2025 To: City Council From: Planning Director, Jon Derby Subject: Textile Rehabilitation Certification, Burdette Textile Mill Meeting Date: November 25, 2025 Type of Agenda Item: Resolution Attachments: Resolution REQUEST The City of Simpsonville has received a request to certify, by Resolution, that 118 NE Main St. & 124 NE Main St. (Tax Map# 0315.00 -02-004.00 & 0315.00 -02-001.00) are the former location s of textile manufacturing operations that served the contiguous sites of the Burdette Building and the Simpsonville Oil Mill gin. This will allow the property owners to apply for income tax credits to help offset the costs of redeveloping the sites. LOCATION & SITE DESCRIPTION The subject properties are located at 118 NE Main St. & 124 NE Main St. These locations currently contain the old City Hall site and the prior Suntrust / AAA Insurance building. STAFF COMMENTS Staff finds that there is evidence that this site, along with the surrounding properties, were used for textile manufacturing. By obtaining income tax credits, there will not be a negative monetary impact to the City. AGENDA ITEM Burdette District Redevelopment PIN / Tax Map # 0315000200100 0315000200400 Simpsonville, South Carolina REQUEST FOR TEXTILE MILL SITE CERTIFICATION October 31, 2025 TABLE OF CONTENTS Timeline of Ownership and Uses Location of Mill Buildings

Text truncated. Open the original for the full document.

Source: City of Simpsonville website. First collected Oct 17, 2026.