RecordWell Data

Packet

City of Hardeeville · Jasper County · meeting of Jan 7, 2021 · Agenda packets

Open the original document More from City of Hardeeville

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF HARDEEVILLE CITY COUNCIL WORKSHOP THURSDAY, JANUARY 7, 2021 4:00 PM I. CALL TO ORDER II. MANGERS REPORT 1. STATUS OF FIRE STATION 82- REPAIRS / RENOVATION / DEMOLITION HARDEEVILLE FIRE STATION 82 (PDF).PDF 2. BROOKS WILLIS DRIVE RECONSTRUCTION AND PARTNERSHIP WITH ASSOCIATION OWNERS BROOKS WILLIS DRIVE UPDATE (PDF).PDF III. ADJOURNMENT 1. 2. 2.I. Documents: 2.II. Documents: 3. Hardeeville Fire Station 82 Building Issues and Remediation Options Building Issues • Leaking roof and gutters caused ingress of rainwater between exterior and interior walls over several years • Over time the ingress of water caused unknown damage to interior and exterior walls • Roof, gutters, and windows replaced • Building was constructed with insufficient waterproofing behind exterior walls with no means for water egress • Over time, the water trapped within the walls caused the growth of mold • Air quality testing and mold treatment was completed; however, the levels of mold in the building continued to increase Station Operation • With the increasing levels of mold, the building was deemed to be unsafe to occupy by the air quality testing firm • Fire Department Staff was relocated to Fire Station 83 and have been operating from that location Remediation Option 1 • Demolition and removal of contaminated materials, chemical mold remediation and repair/renovation of the living quarters portion of the building. • Approximate cost = $240,000 - $390,000 • Building would be required to brought up to current building codes • Timeline approximately 3 – 4 months • Fire Department Staff would continue to operate out of Station 83 Remediation Option 2 • Demolition and removal of contaminated materials and complete re- construction of the living quarters portion of the building • Approximate cost = $750,000 • Timeline approximately 4 – 6 months • Fire Department Staff would continue to operate out of Station 83 Remediation Option 3 • Demolition of the living quarters portion of the building without re- construction • Installation of a mobile living quarters unit • Approximate cost = $50,000 + $1,500/month rental of mobile unit • Timeline approximately 1 – 2 months • Fire Department Staff would operate out of Station 83 during demolition Remediation Option 4 • Demolition and removal of contaminated materials, chemical mold remediation of the living quarters portion of the building. • Sale of building and property and construction of a new fire station at an alternate location • Approximate cost = $1,500,000 - $2,500,000 (dependent on sale price) • Timeline approximately 12 – 18 months • Fire Department Staff would continue to operate out of Station 83 Considerations • Should we choose to keep the station in the same location? • Should we sell and pick and new more suitable location? • Is the station in a good location considering the future growth in the area? Recommendation • Option 3: Installation of Mobile Living Quarters • Shortest timeframe to resume operations at Station 82 location • Lowest short-term cost • Allows time to budget for permanent solution Total Phase I Project Cost - $1,895,000, executed an IGA with Jasper County for the project to be reimbursed through Jasper County local option sales tax. City of Hardeeville/Jasper County - Exit 8 and US 278 Improvements Project Area Phase I East US 278 toward Hilton Head From at Intersection City of Hardeeville/Jasper County - Exit 8 and US 278 Improvements Project Area Phase I UPDATES: • Design is finalizing and will enter project review and permitting stages, 60 to 75 days are estimated for permitting. • Bidding and Project Award – 30 to 45 days from completion of the permitting process. • Construction completion – 90 to 120 days from project being awarded. • Met with CEO Joel Taylor and provided Project Update and timeline. • Working with Brooks Willis Drive landowners for contract with City for improvements made to Brooks Willis Drive, 2 of the landowners have signed the Contract, Hampton Inn – Jay Patel and Fairfield Inn – Justin Patel. BROOKS WILLIS DRIVE PROJECT Responsibilities as part of the Contract: • City of Hardeeville o City incur certain third-party professional fees and costs, $100,000.00 in connection with the development of appropriate legal documents necessary to effectuate the Road Construction Project, and the City’s engagement and utilization of legal counsel for the City, any one or more engineering firms for the City (including but not limited to Alliance Engineering Consultants), any one or more financial advisors to the City and any other person (other than employees of the City) performing services by or on behalf of the City in connection with the road construction. o Search for grant availability to lesson the total cost contribution of the owner’s association. o Take ownership of the road. • Exit 8 Owners Association o Will pay for the development & construction costs of the road at the cost of $520,000.00. o Association agrees to deposit into escrow with the City a sum equal to $100,000.00. o Shall also provide a letter of credit to the City in the amount of $620,000.00. o Shall transfer road to the City. Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Pictures as 01/04/2021 Questions

Source: City of Hardeeville website. First collected Oct 17, 2026.