Fiscal Year 2023 Adopted Budget July 1, 2022 – June 30, 2023 GOVERNMENT FINANCE OFFICERS ASSOCIATION Distinguished Budget Presentation Award PRESENTED TO City of Hardeeville South Carolina For the Fiscal Year Beginning July 01, 2021 Executive Director The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished Budget Presentation Award to the City of Hardeeville , South Carolina for its annual budget for the Fiscal Year beginning July 1, 2021. In order to receive this award, a governmental unit must publish a budget document that meets program criteria as a policy document, as an operations guide, as a financial plan, and as a communications device. This award is valid for a period of one year only. We believe our current budget continues to conform to program requirements, and we are submit ting it to GFOA to determine its eligibility for another award. TABLE OF CONTENTS City Managers Letter Transmitting Proposed Budget to City Council Preface Basis of Budgeting and Accounting 1 Fund Structure 1 Budget Process Overview 2 Budget Calendar 2 Introduction City Mission Statement 3 Council Goals 4 G o v e r n m e n t O v e r v i e w 1 2 O r g a n i z a t i o n a l C h a r t 1 3 Hardeeville Location 14 Hardeeville at a Glance 15 Financial Policies Financial Policies 17 Fund Balance 17 D e b t 1 8 Legal Debt Margin Calculation 18 Current and Future Debt Principal and Interest 19 Bond Rating 19 Consolidated Budget M a n a g e m e n t S u m m a r y 1 9 Budget Summary 20 Changes to Proposed Budget 21 Budget Trends 21 Millage 22 General Fund Balance 22 Revenue Projection 23 General Fund Revenue Comparison 23 Other Sources of Revenue 24 General Fund Expenditure Comparison 24 D e p a r t m e n t a l S u m m a r i e s 2 5 Personnel Summary 29 Capital Improvement Plan Introduction 30 Proposed and Approved Projects 31 Appendix Glossary of Terms 152 Glossary of Acronyms 155 FY23 Budget Ordinance 157 PREFACE Bas is of Budgeting and Accounting The terms “basis of budgeting” and “basis of accounting” are used to describe the recognition of transactions or events are to be recognized. The budget is prepared using the modified accrual basis of accounting which is a combination of cash basis and full accrual basis. Modified accrual accounting recognizes revenues when they become measurable and available. Measurable means that the dollar value of the revenue is known or can be reasonably estimated. Available means that it is collectible within the current period or soon enough after the end of the current period to pay current expenditures. Expenditures are recorded when the liability is incurred and not based on cash flow. Revenues related to the current period are generally considered to be available if they are collected within 60 days of the end of the current period. All expenditures incurred during the current period are accrued and are general cash flowed within the 60 days as well. Appropriations lapse at year end; however, encumbrances and amounts specifically designed to be carried forward (i.e., multi-year capital projects and approved grants) to the subsequent year are reappropriated in the following year. The City reports financial information on a fund basis in accordance with general ly accepted accounting principles (GAAP). Depreciation and amortization, which are considered expenses on the GAAP basis of accounting, are ignored under the budget basis because these items do not require an expenditure of funds. If transactions are not a current resource or use, they are reported in the operating fund of the fund financial statement. Under GASB 34, noncurrent activities (i.e., capital assets or long-term liabilities) are reported on the government-wide statements only. Fund Structure The City maintains the following governmental funds which are subject to appropriation: General Fund is the City’s primary operating fund. It accounts for all financial resources of the City except those required to be accounted for in another fund. Departments included in the general fund are: G eneral Government, P olice, Fire, Public Works, Recreation, C ity Council, Municipal Court, Planning and Development, Media, Building Inspection, Finance, W orkforce Development, Information Technology, F acility Maintenance, Safety/Risk M anagement, Debt Service and Festival on Main. Development Fund represents the City’s receipts and disbursements for Developer Agreement (DA) developer fees negotiated under developer agreements. Capital Proje cts Fund accounts for the acquisition of capital assets and construction or improvement of major capital projects such as the construction of new roads. Nonm ajor Governmental Funds include seven Special Revenue Funds used to account for revenue sources that are legally restricted to expenditure for specific purposes. These funds are: Indirect ATAX, Direct ATAX, Local ATAX, Local HTAX, Victim’s Assistance, Fire, and Police Funds. 1 Budget P rocess Overview Budget preparation commenced in early February with the City Manager meeting with Department Heads and key staff to review the process, objectives, expectations, and budget schedule. Department Heads reviewed FY21 actual results and other data to project their anticipated needs for FY23. Budgets were then reviewed in detail with the City Manager, Deputy City Manager, and Finance Director. While departmental budget requests were being prepared, department heads were assessing their capital needs. Capital requests were finalized, compiled, and reviewed. Each project was reviewed individually and considered collectively based on the availability of funding for Capital Projects. Note that a project not being funded is not a reflection of the merits or importance of the request, but rather the result of limited funding for such projects. Revenue projections are developed and potential changes to the millage rate are reviewed as the budget is balanced, reconciled, and compiled. The City of Hardeeville FY23 budget includes a millage rate reduction of 2 mills. On April 13th, 2022, the City Manager transmitted the proposed budget to City Council for their review, consideration, and adoption. City Council’s review included budget workshops. Four budget workshops were held in April and May to provide Council and residents opportunity to pose questions, receive additional information and provide input on the budget. (Note: All workshops and public hearings are advertised and open to the public and citizens are encouraged to participate in the process and provide input either in person or through live stream media.) Based on input from Council, staff revises the budget as appropriate. In accordance with South Carolina law, public hearings were held on June 9, 2022, and June 16, 2022 and the budget was adopted by Council on June 16, 2022. FY23 Budget Calendar February 2, 2022 BudgetKick-Off Meeting- City Manager met withDepartment Headsto outlinethe schedulefor preparing the FY23 budget February 18, 2022 InitialBudget Requests, Revenue Projections, Statement of Level of Service, five-year Capital Improvements Plan, Department Mission Statements, Goals and Objectives due to Finance Director February 22-March 9, 2022 City Manager and Finance Director review requestsand meet with Department Headsto review and revise departmental budgets March 10, 2022 Hold workshop with CityCouncilto discuss millage, prioritiesand proposed improvementsand projects March 11-18, 2022 City Manager and Finance Director meet with City Council Members individuallyto discuss preliminary budget proposals March 21-April 8, 2022 City Manager prepares Proposed Budget April 13, 2022 Submission of Proposed Budget to City Council April 27, 2022 City Council Budget Workshop June 9, 2022 First Reading of proposed FY23 Budget Ordinance and Public Hearing June 16, 2022 Second and FinalReadingof Budget,Public Hearingand Approval of Budget and FY23 Millage Rate July 1, 2022 New Fiscal Year begins 2 INTRODUCTI ON City Mission Statement The City of Hardeeville, South Carolina is in partnership with our community and works to protect and enhance the quality of life by providing a high level of service in an efficient and responsive manner for all citizens. The primary goal of the City is to support the success and wellbeing of the community by maximizing our resources (services, programs, facilities and financial assets) while being good stewards of public funds to provide the greatest possible benefits for all citizens, visitors and businesses. The City recognizes that as it continues to grow and develop it must be flexible in implementing various changes in efforts to continue to provide successful levels of programs and services. Council Goals Acknowledging the need to periodically review operations, and the challenges and opportunities facing Hardeeville, City Council conducts an annual retreat. The most recent retreat was conducted on January 11, 2022. That day, the City Council, Administration, and Department Heads worked collaboratively to identify priorities for the City. Pursuant to the retreat and subsequent discussions, City Council, at its March 3, 2022, meeting adopted Resolution 2022-3- 3H. Pursuant to the resolution referenced above, City Council and staff focus their energy and resources on accomplishing the objectives included therein. On an ongoing basis, not solely during the budget process, the City Manager and staff consider these goals, the impact of growth and the cost and impact of ongoing services. The goals below provide guidance on the Council’s desired direction and initiatives in the immediate, intermediate and long term. The 44 Goals adopted by City Council can be found on the eight pages that follow. 3 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 2022-2023 HIGH PRIORITY APPROVED 2022 GOALS ONGOING IMMEDIATE FY23 BUDGET IMPACT 1 Improve relations with Jasper County. No budgetary impact. MEASURABLE: Metrics and milestones. How much? What percentage? * City Council attend 25% of County Council Meetings in 2022. * Cohost 2 lunch and learn joint council workshops in 2022. * City and County administration successfully complete 2 co-sponsored projects in 2022. 2 Designate a permanent placement for Media staff with studio space. Various * Explore the 5 options identified for placement CIP item 23-040 $50,000 to build out media space through department analyzation, placement, and CIP item 23-052 $20,000 for media space furnishing utilization of studio by Summer 2022. Permanent Media personnel will move into new offices at Old City Hall in February 2023. placement of media staff by Summer 2023. 3 Implement the Master Plan/Municipal HUB to renovate Whyte Hardee Blvd. Council expressed a desire to proceed more slowly than had been previously planned. * Final Design completed by Winter 2023. CIP item 23-001 includes $300,000 for the municipal hub. * Traffic calming and streetscape completed at CIP item 23-050 includes $552,800 for the Whytee Hardee Blvd masterplan. Whyte Hardee Blvd. and SC 46 Intersection. 4 Improve road and traffic safety, particularly at problem intersections along Argent Blvd. Various * Work with DOT to install traffic signal by 2023. CIP item 23-003 includes $1,570,000 for Argent Blvd & Short Cut Road * Add two additional officers to assist with traffic CIP item 23-004 includes $850,000 for Argent Blvd & East Argent Parkway control along Argent Blvd, US 278, and John Smith CIP item 23-004 includes $500,000 for partnership with Beaufort and Jasper Road by Fall 2022. Counties to improve 170 and Argent Boulevard. * Increase speeding citations delivered by 10%. 4 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 5 Create and develop public places / services to honor Veterans. (Veterans Park) CIP item 23-001 includes $300,000 for the municipal hub project which includes Veterans Park. * Complete final design by Fall 2022. * Demolish existing house structures by Fall 2022. 6 Secure ownership of Randall St. property. No budgetary impact. Property is not currently available for sale. Should it go * Explore property to purchase if comes available, back on the market, City would be able to pursue purchase with Land allocation of funds for property purchases for Acquisition Funds. downtown revitalization. 7 Develop a clear policy for the preservation of citywide natural resources (wetlands). No budgetary impact. Current City staff will be tasked with completing this. * Policy to be completed by Fall 2022. 8 Develop a Historical Society and work with services agencies for additional programs and services. No budgetary impact. * Identify 3-5 interested participants for Historical Society Council formation by Fall 2022. * Conduct first meeting by Winter 2023. 9 Allocate more budget to funding the police department. The FY23 budget anticpates hiring of 4 patrol officers in the first half of the FY. * Increase police department staffing by 10% or Projected all in costs for these 4 officers in FY23 is approximately $609,000. approximately 3.5 FTE by Fall 2022. 10 Develop a better process for car allowance of vehicles. No budgetary impact. City Council discussed the City's vehicle policy at a * Review existing policy and make any necessary workshop on April 13, 2022. No change was suggested to policy. amendments, to be completed by Summer 2022 which includes the strategy for vehicle purchase/lease, replacement, and assignment. 11 Bring natural gas lines to Whyte Hardee Blvd. for economic development of new business. $200,000 of ARPA funding has been earmarked the expansion of natural gas lines to downtown business. * Work with Dominion to have gas installed to the intersection of SC 46 and Whyte Hardee Blvd. by Fall 2022. 5 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 12 Expansion of recreation and sports competition programs for youth, teens, and seniors. No budgetary impact. Recreation staff is always looking for ways to expand programs to citizens of all ages. * Increase sports related program participation by 10% in 2022. * Implement two new team sport leagues in 2022. * Host one sports tournament in 2022. 13 Enhance interactions between Council and Staff. No budgetary impact. Anticipated costs for these lunch and learns will be * Each council member host a lunch and learn with negligible. each Department Head to be completed by Fall 2022. * Each Department host a lunch and learn for each Council Member to be completed by Summer 2023. 14 Improve communication with the City overall. CIP item 23-040 $50,000 to build out media space * Complete citywide communication plan by Spring 2023 CIP item 23-052 $20,000 for media space furnishing * Improve City television services by Summer 2022. The new media space and furnishings will enable the Media Department to * Invest in additional communication tools by greatly enhance the quality and frequency of communications with citizens. Summer 2022 that provides better communication FY23 budget includes an additional staff member in the IT Department at services for public awareness and engagement. $88,000. This staff addition will enable the City to enhance its interal and external communications. NEW 2022 GOALS IMMEDIATE 15 Complete Regional Traffic Analysis This project will require multiple funding sources and collaboration with * Work with LCOG and LATS for committed LCOG and L ATS. The deve loper of the Karrh Tract pledged up to $300,000 sponsors hip of and responsibility to complete the to this study along with several other potential stakeholders who will also Regional Traffic Analysis. participate in the study. * Secure funding from local jurisdictions to complete the Regional Traffic Analysis. 16 Review and update Municipal Zoning and Development Ordinance An RFP to attract qualified consultants to perform this task has been drafted * Professional services obtained to have updated and will be issued in late FY22 or early FY23. Municipal Zoning and Development Ordinance by The FY23 budget includes $45,000 for this task which may need to be Summer 2023. increased based upon consultant responses. 6 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 17 Develop a clear process and policy for new and existing development including items such as wetlands, tree cutting, traffic green spaces, and multiple entrances. The process and policy will be included in the work done for Goal 16 above. * Develop new policy for development by Fall 2022. * Implement process by winter 2023. 18 Establish a parade committee for annual parades. No budgetary impact. The Recreation Department is taking the lead on * Establish committee and implement process by establishing a parade committee. The committee will include participation from Spring 2022. other City departments and community volunteers. 19 Improve safety and security for Council chambers. No budgetary impact. This project was funded in FY22 and will be completed * Complete installation of bulletproof glass and in late FY22 or early FY23. Estimated project cost is $75,000. bulletproof materials by Summer 2022. 20 Develop a comprehensive city owned facilities plan. Staff is in the initial stages of this project. Budget impacts will be provided at * Complete plan by Winter 2023. a later time. * Move forward with City Hall Annex development, request for design and determine finance options to be considered by Spring 2023. * Complete analysis for new police station location by Spring 2023. 21 Develop a comprehensive citywide recreational plan. No budgetary impact. CIP item 23-049 was proposed but not funded in * Complete plan by Fall 2023. FY23. The request was for $60,000 but is included in the 5 year CIP. 22 Develop a citywide event strategy for introduction and implementation of new events and festivals and continuous operations of existing events and festivals. No budgetary impact. The Recreation Department has established a special events committee. * Complete plan by Spring 2023. 23 Develop Road Department to maintain new city owned roads. No budgetary impact. CIP item 23-029 proposed the establishment of a * Develop Road Department by Fall 2023. Street Maintenance Division. Requested FY23 funding of $250,000 was not included in the FY23 budget but remains in the 5 year CIP. 7 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 24 Improve visibility and understanding of City goals and objectives. No budgetary impact. Efforts to improve the visibility and understanding of * Make goals more visible to Council and public with City goals and objectives occurs regularly. City staff reviews these regularly use of visual displays and digital media spotlight by and reports to Council on progress quarterly. In addition, this report will be Summer 2022. included in the final budget document, addressed in the City's Popular Annual Financial Report (PAFR) and the City's Annual Report. 25 Develop first bike and pedestrian trail inside City. CIP item 23-043 includes $680,000 in FY23 funding for the ALTA bike/ * Richard Gray Sports complex Trail, complete design pedestrian trails master plan. and permitting of first trail by Fall 2022 and complete construction by Spring 2023. 26 Evaluate City staffing for growth and development. FY23 Budget calls for 11 positions to be added throughout the fiscal year. * Expand citywide total staffing by 20%. FY23 costs for the 11 new staff is projceted to be $1,065,000. APPROVED 2022 GOALS ONGOING SHORT TERM (2-5) YEARS 27 Continue development of Richard Gray Sports Complex. CIP item 23-042 includes FY23 funding of $635,000 for the continued * Plan, design, and construct additional phases of JuJu Hutson Park development of the Richard Gray Complex. and Playground. 28 Develop bike and pedestrian lanes throughout the City. No budgetary impact. City has adopted a Bicycle/ Pedestrian Master Plan. * Work with East Argent road development for trail As new developments are proposed, the City is requiring developers to development through community. construct sidewalks, walkways and bicycle paths. * Work with Dominion Energy for right-of-way use for new trail development. * Work with Heron Point to complete downtown trail development. 29 Develop a computerized Master Plan for project management. In May, 2022 the City hired its first Project Manager. Researching and * Hire new Project Director and implement new developing an RFP for a project management solution for the City is one of the project management software. tasks the Project Manager has been assigned. 8 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 30 Increase utilization of the library. The City has purchased scheduling software for the library and will take over * Increase utilization of computer room and the scheduling of the meeting room and computer lab. This software will community room of the library by 25%. enable City residents to easily reserve both the computer room and community room. It is anticipated that utilization will increase by much more than 25%. 31 Increase job training for the new workforce. ARPA funding in the amount of $421,000 has been bugeted to provide funding * Increase welding and CDL graduates by 10%. to the Workforce Training Program for FY23. Adequate funding is available * Analyze opportunities to add new programs and to provide these training opportunities to a larger number of participants. services for workforce training. The City continues to seek additional partners to contribute to the program. * Partner with community groups and nonprofits to increase other workforce training programs. 32 Implement the Municipal Hub Master Plan. For FY23, $300,000 has been proposed for the Municipal Hub/ Veterans * Plan, design, permit, and construct various Park project. components of plan in phased approach. * Incorporate public/private partnerships when opportunities are available. 33 Develop a comprehensive drainage plan with projects, budget, and milestones. This is a three year, $800,000 project that began in FY20. Project will be * Plan, design, permit, and construct various completed in FY22 with the final deliverables expected to be received by components of plan in phased approach. December 2022. NEW 2022 GOALS SHORT TERM (2-5 YEARS) 34 Develop ALS Services Strategy to accommodate City growth and expansion. $300,000 Fire Department staff continue to train and receive Advanced Life Support Certification. * Review existing services and need for growth of CIP item 23-013 provides $300,000 for the purchase of the City's first new and existing services, provide alternate ambulance. This CIP item further proposes $300,000 for both FY25 and solutions by Fall 2022. FY27 to acquire and additional ambulance in each of those years. Fire Station 84 will be staffed and operational in FY23 at an anticipated annual cost of $640,000. 9 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL APPROVED 2022 GOALS ONGOING LONG TERM 35 Use the conservation easement to develop a passive recreation center for the region. No budgetary impact. $50,000 was approved in the FY22 CIP budget but project is on hold until the necessary infrastructure is developed. * Develop master plan for conservation area once the area becomes accessible with the new road development. * Address with new city comprehensive recreational plan. 36 Evaluate zones and locations for police department, prioritizing specific areas as needed (Argent). No budgetary impact. The Police Department monitors and evaluates patrol staffing on an ongoing basis and provides enhanced patrols as warranted. * Continue evaluating traffic, collision, and speeding A strategic plan for future service areas is being developed. data, along with criminal activity to prioritize areas for implementation of new zones. 37 Evaluate and enhance police personnel staffing and retention strategies. Nominal budgetary impact. The Police Chief has included this as one of the * Conduct internal survey of police staff for feedback department's goals for FY23. to address individual and department needs. * Complete comparison analysis of neighboring police departments. 38 Develop policies and handbook for future health emergencies. Explore financial impacts. The City's Emergency Operations Plan provides policy and guidelines for all manner of emergencies. This plan undergoes continuous reviews and updates. * Utilize known data and impacts from COVID-19 pandemic to establish any new policies associated with future health emergencies. 39 Develop a comprehensive plan to address homelessness. No budgetary impact. Project still in the conceptual phase. * Research and analyze the types of programs and services that other Cities are using in South Carolina and neighboring Cities such as Savannah. 10 City of Hardeeville, SC City Council Adopted Short Term and Long Term Goals FY23 Budget Inclusion and Impacts GOAL 40 Develop Millstone Landing along the Savannah River with park amenities. City is under contract with Hardeeville Marine Rescue Squadron until 2028. A$60,000 improvement to the shelter is scheduled to be completed in FY23. $40,000 of this cost will be funded through a PARD grant. * Address with new recreational plan. No major work is planned until closer to lease end. * Coincide development with RiverPort Parkway north and Exit 3. 41 Create offices in Hardeeville for Volunteers in Medicine and other nonprofits. No budgetary impact. Project still in the conceptual phase. * Address need in the City’s comprehensive facilities plan. 42 Intensify efforts to decrease distracted driving. No budgetary impact. Both the Police and Recreation Departments are * Partner with state and local law enforcement, local working with the Lutz Foundation and other organizations to combat distracted jurisdictions, community partners to address. driving. No additional staff resources required for this endeavor and only nominal other costs will be incurred. 43 Develop a plan to beautify the median along 278. No budgetary impact. Project is still in the conceptual phase. Discussions * Partner with local jurisdictions and community with Beaufort County, Jasper County and SCDOT are ongoing. partners to address. 44 Increase our involvement in solar energy. No budgetary impact. Project still in the conceptual phase. * Address the potential use of solar energy in the facilities comprehensive plan. 11 City o f Hardeeville Government Overview The City of Hardeeville operates under the Council-Manager form of government. Policy making and legislative authority are vested in a governing council consisting of five members. The governing council’s responsibilities included, but are not limited to, passing ordinances, adopting the budget, appointing committees, and hiring the government's manager, municipal judge, and attorney. The City Manager is responsible for carrying out policies and ordinances of the governing council, for overseeing the day -to-day operations of the City, and for appointing the heads of various departments. The four (4) Council members and Mayor are each elected to four -year staggered terms; with two (2) council members being elected every two (2) years and the other two (2) council members and Mayor running during the next election year. Municipal elections occur in November of even numbered years. The four -year terms begin in January of the year following the election. The City provides a full range of services including police and fire protection, maintenance of streets and parks, recreational activities, cultural events, court services, planning, building & development services, code enforcement, economic and community development and media coverage. The City’s Organization Chart is on the following page. 12 Citizens of Hardeeville Mayor & City Council Municipal Judge City Manager City Attorney Deputy City Manager Finance Director City Clerk Police Chief Planning Director Public Works Director Project Manager Parks, Recreation & Tourism Director Administrative Services Director Fire Chief Media Director Manager of Information Systems 13 14 City of Ha rdeeville at a Glance The I-95 corridor provides an accessible route for Hardeeville to capitalize on nearby major urban and tourist markets such as Hilton Head, Savannah, and Charleston. Another asset is the proximity to the three major cities of the south east - Jacksonville, Atlanta, and Charlotte. T he City of Hardeeville’s I-95 location enables easy access to Savannah/Hilton Head International Airport, the Port of Savannah, the future Jasper Ocean Terminal and to major rail services. In recent years, the City of Hardeeville and Jasper County experienc ed increased economic opportunity and population growth complimenting the growth of Beaufort County and the Town of Bluffton. As City leadership saw growth in these neighboring communities, they developed and implemented a long- term plan with a vision focuse d on economic development, the addition of quality housing options for residents and providing quality recreational opportunities for the citizenry. Ha rdeeville’s growth included annexing large tracts of land along US 278, US 17, and the I-95 corridor. Through these annexations, the City of Hardeeville grew more than tenfold. The City grew from five square miles in 2000 to fifty -six square miles in 2020. With this exponential growth, the City of Hardeeville is the fastest growing municipality in SC over the last ten years. The City’s expansion, especially along the US 278 corridor from I-95 Exit 8 to Beaufort County, has generated limited commercial development and the development of quality housing in communities such as Sun City, Hilton Head Lakes and Latitude Margaritaville. These residential communities continue to expand, and other new developments are underway , further increasing the availability of housing and commercial opportunities in the East Argent and West Argent communities along with areas along US 278. A o nce rural city located along the I-95 corridor in the Lowcountry of South Carolina, the City of Hardeeville continues to experience increased growth and development. The City now encompasses over fifty -six s quare miles and continues to receive and review additional development opportunities. Hardeeville’s population continues to grow, and the US Census preliminary population estimate for 2020 is 7,473 residents. Most of Hardeeville is located within Jasper County, with the balance located in Beaufort County. The City of Hardeeville is a diverse community. A sampling of that population diversity: 28% African American and Hispanic 12% Age 18 and under 36% Age 65 and over The City of Hardeeville projects its population will exceed 31,000 residents by the year 2030. Current and planned development will add 10,000 residential units over the next ten years . In addition to this residential growth, an additional 12 million square f eet of commercial space (hotels, restaurants, and various retail establishments) will be added over this timeframe as well. The City has already begun planning for the increased demand for programs and services . Initiatives include promoting new community services, the increased need for healthcare and assisted living facilities and affordable workforce housing. 15 Economy S ituated at the convergence of three major highways, Hardeeville has over 100,000 vehicles per day pass through on I nterstate 95, and US Highways 17 and 278. The City is close to Savannah/Hilton Head International Airport, the ports of Savannah and Charleston and a major CSX rail trunk line. The City's I-95 exits, exits 5 & 8 provide a gateway to coastal communities. In contrast, the new I-95 Exit 3 Interchange project will provide an intermodal transportation hub bringing together of port and rail systems, airports, and easy interstate access. Commercial growth remains strong along both of Hardeeville’s I -95 exits. Along the US 278 corridor, new restaurants and businesses are opening. At Exit 8, a Hampton Inn recently opened, and Marriott Fairfield Inn will open soon. The City of Hardeeville’s I-95 Exit 3 Interchange Project will complement these major economic development projects along US 17. Exit 3 will provide direct economic impact to the entire region. Along with the development of I -95 Exit 3, the South Carolina Department of Transportation (SCDOT) is working to expand US 17 and is developing plans to widen I -95 from the Georgia state line to I-95 Exit 8 in Hardeeville. Continued growth of the Port of Savannah and the establishment of the proposed Jasper Ocean Terminal will be primary drivers in the City’s anticipated job growth in the coming years. Riverport Industrial Park and the development of Hardeeville Commerce Park will also add jobs to the City. The Sherwood Tract, a mega site of over 1,300 acres suitable for large industrial and commercial development will provide additional job creation. The expansion of medical and healthcare services, including the Hilton Head Regional Hospital’s Tidewatch Free- Standing Emergency Department and Beaufort Memorial Hospital ’s 70,000 square-foot medical center, have improved access to healthcare for City residents. Additionally, these facilities provide numerous employment opportunities to Hardeeville residents. The City provides a well -trained labor force that provides significant value to the transformation of the local economy. Based on the Census Bureau’s 2015 - 2019 American Community Survey 5 Year Estimates, 91% of Hardeeville residents are 25 and older graduated high school and 38% of those same residents have earned a bachelor’s degree. The City’s workforce participation is roughly 50% of its total population due, in part, to the considerable number of retirees. To further provide a well-trained workforce, the City of Hardeeville, in partnership with Palmetto Training Incorporated, initiated a Career Advancement and Workforce Training program. The City was awarded a $350,000 grant from EJF Philanthropies to establish programs for a National Center for Construction Education & Research (NCCER) welding certification, OSHA 10-hours construction safety certification, forklift certification and a Commercial Driver’s License (CDL) program. In the Fall of 2020, the first participants in these programs graduated. 16 FINANCIAL PO LICIES Financial Policies The City of Hardeeville’s financial policies are governed by South Carolina state law, the City Charter, and Generally Accepted Accounting Principles (GAAP). These laws, principles and policies describe ways to amend the budget after adoption, budgetary controls and reporting and appropriate methods for budgeting, accounting, and reporting. The City Manager is authorized to make transfers provided that no such transfer shall: 1. Be made from one fund to another fund, 2. Conflict with any existing Bond Ordinance, 3. Conflict with any previously adopted policy of the City Council. Any c hange in the budget which would increase or decrease total authorized expenditures must be approved by City Council. The accounting policies of the City of Hardeeville conform to GAAP as applicable for governmental units. The Governmental Accounting Standards Board (GASB) is the accepted body for establishing governmental accounting and financial reporting principles. The City’s budget is prepared using the accrual basis of accounting. It is also the same accounting basis used for the City’s audited financial statements. Revenues are recognized as soon as they are considered measurable and available. Measurable means that the dollar value of the revenue is known or can be reasonably estimated. Available means that it is collectible within the current period or soon enough after the end of the current period to pay current expenditures. The City considers certain revenues related to the current period to be available if they are collected within 60 days of the end of the current period. Expe nditures generally are recorded when a liability is incurred and not based on cash flow. All expenditures incurred during the current period are accrued and are generally paid within the 60 days as well. All appropriations lapse at year end; however, encumbrances and amounts specifically designed to be carr ied forward (i.e., multi -year capital projects and approved grants) to the subsequent year are re-appropriated in the following year. The accounts of the City are organized as funds. Each is considered a separate accounting entity. Fund accounting is designed to demonstrate legal compliance and to aid financial management by segregating transactions related to certain government functions or activities. The operations of each fund are accounted for with a separate set of self -balancing accounts that comprise its assets, liabilities, fund balance, revenues, and expenditures. South Carolina law requires the City to adopt a balanced budget each year. A balanced budget is one in which budgeted funding sources equal budgeted expenditures. Fund B alance Fund Balance is generally defined as the difference between a fund’s assets and liabilities. It is intended to serve as a measure of the financial resources available in a governmental fund. It is essential that governments maintain adequate levels of fund balance to mitigate current and future risks, ensure stable tax rates, maintain bond rating, and not jeopardize the continuation of necessary 17 publi c services. The City Council has set a minimum fund balance target of 20% of expenditures and recurring transfers. The City refers to this fund balance target as the budget stabilization fund. The budget stabilization fund amounts to $3,467,961 for FY 20 23. The total estimated fund balance for the General Fund for the year beginning July 1, 2022 is $1,571,012. The City has committed unreserved fund balance as follows: The Economic Development Fund is established for marketing Hardeeville Commerce Park and other targeted areas in the City, assisting Southern Carolina Alliance when attracting new industrial prospects to the City by financing needed studies or infrastructure improvements, or other Economic Development activities recommended by the City Manager and approved by the City Council. The Economic Development Fund Balance shall be increased by 20% of the Unassigned Fund Balance at the end of the Fiscal Year. The Land Acquisition Fund is established for the purchase of real property which will benefit the community and serve a vital identified need, or other related activities as recommended by the City Manager and approved by the City Council. The Land Acquisition Fund shall be increased by the net proceeds of all land sales by the City of Hardeeville. Debt The City’s FY 23 budget includes additional debt for the purchase of equipment and renovations. Debt Service (principal and interest) for FY 23 Debt Service totals $ 2,103,000 compared to the FY2 2 total of $2,512,000. Debt Service the City is direc tly responsible for in FY23 is $1,171,000. The remaining principal and interest payments are funded by Developer Agreement (DA) Fees, ATAX, and HTAX. The City incurs debt for the purchase, renovation, and construction of City facilities. City facilities currently being financed are City Hall, Fire Department and the Hargray Building which serves as the Fire Department Headquarters and Emergency Operations Center (EOC) building, Public Works facility site, Police and Court building, Library, and the Recre ation Center. Debt Service for City facilities totals $1,361,000 for FY 2023. Remaining Debt Service of $742,000 is associated with the purchase of Public Works, Police and Parks and Recreation equipment and vehicles for the Police, Fire and Public Works departments. The City’s general obligation debt is limited by law to eight percent of the total assessed value of all taxable real and personal property of the district. The latest assessed value is $72,152,000. The legal debt limit is computed as follows: Legal Debt Margin Calculation Assessed Value $72,152,000 Debt limit (8% of assessed value) 5,772,160 Debt applicable to limit: Genera l Obligation Bonds ($992,617) Legal Debt Margin $4,779,543 18 Curr ent and F uture Debt Principal and Interest Bo nd Rati ng Moody’s June 2021 issuer comment on the City of Hardeeville provided the following Credit Overview: The credit position for Hardeeville is solid. However, its A1 rating is a little weaker than the US cities median of Aa3. The notable credit factors include a very healthy financial position, a strong wealth and income profile and a sound tax base. It also reflects an affordable debt burden and a moderate pension liability. In M ay 2022, Moody’s reviewed the rating above. The rating was affirmed, and no report was issued. CONS OLIDATED BUDGET Management Summary The City of Hardeeville Consolidated Municipal Budget comprises both the annual operating budget and the capital improvement budget. The City's FY23 total budget is $46,496,004 of which $14,325,471 is programmed for capital projects. The Operating Budget finances the day-to-day operations of the City. The budget includes general government administration and operations, debt service, and transfer payments for the fiscal year. The funding for th e budget is derived from taxes, fees, licenses, fines, and inter -governmental revenues (state and federal). Original Issue Amount Prinicpal Inter est Total Principal & Inter est Due After FY23 Final Payment FY Existing Debt Service 2017 Revenue Bond 610,000$ 63,610$ 621$ 64,231$ -$ 2023 Revenue 11122769 2,473,000 175,852 7,935 183,787 91,893 2024 2018 Note A Tax Exempt 4,722,000 183,000 126,416 309,416 4,822,384 2038 2018 Note B Non Tax Exempt 928,000 37,000 39,704 76,704 1,096,109 2038 2017 GO Bond 780,500 19,843 19,339 39,182 900,091 2046 2018 Revenue Bond 6,500,000 340,000 155,605 495,605 5,652,711 2033 2019 IPRB 2,482,000 234,000 67,233 301,233 1,947,251 2034 2019 Equipment Lease 1,500,000 143,839 23,715 167,554 1,089,100 2030 2022 Equipment Lease 141,115 34,632 3,264 37,896 75,792 2025 Lease Purchase Series 2021B 3,291,800 172,292 60,457 232,749 3,467,998 2037 Existing Debt Service 1,404,068$ 504,289$ 1,908,357$ 19,143,329$ Proposed New Issuances Public Works Equipment Purchase 75,000$ 12,338$ 1,798$ 14,136$ 56,563 2027 Public Works Equipment Purchase 65,576 14,116 2,056 16,172 64,687 2027 Fire Station Renovation 1,000,000 37,062 29,490 66,552 1,264,482 2042 Police Department Renovation 840,500 24,210 73,170 97,380 876,520 2032 Proposed New Issuances 87,726$ 106,514$ 194,240$ 2,262,252$ Proposed FY23 Debt Service 1,491,794$ 610,803$ 2,102,597$ 21,405,581$ FY23 Payments 19 Th e Capita l Improvement Program (CIP) is a multi- year planning instrument that drives the identification, evaluation, and financing of capital infrastructure projects. Capital projects rang e from construction and renovation of municipal buildings, parks, and recreation facilities to purchase of vehicles and equipment. CIP projects typically carry considerable future impact and have a life span of five years or more. The City's FY23 total budget general fund expenditures include a contingency of $320,483. Also included are budget stabilization funds in the amount of $3,467,961. Budg et Summary The FY23 Summary Budget for the City of Hardeeville, with comparative data to FY21 actual and FY22 projected amounts is presented to provide a snapshot of Revenues, Expenses and Fund Balance. FY 2021 Actual Pr oj ected FY 2022 FY 2023 Approved Budget Revenue General Fund 14,021,886 22,873,834 24,321,043 Community Foundation - 445,758 580,758 State Accomm Tax Indirect 116,372 140,000 150,000 State Accomm Tax Direct 63,553 70,000 75,000 Local Accommodations Tax 983,990 1,126,373 1,166,373 Local Hospitality Tax 1,263,824 1,294,902 1,324,902 Hilton Head Lakes SAD 1,133,000 - - Investment and DA Fees 8,757,870 4,790,330 4,552,457 Five Year CIP 8,856,177 6,364,633 14,325,471 Total Revenue 35,196,672 37,105,830 46,496,004 General Government 1,034,617 4,820,836 6,755,091 Police 2,660,918 3,359,317 3,949,233 Fire 3,295,073 3,951,518 4,620,887 Public Works 775,070 948,555 1,060,033 Recreation 494,987 957,074 1,135,593 Council 156,823 196,538 112,498 Court 185,798 251,846 274,457 Planning 319,676 300,325 693,503 Media 217,957 243,480 262,138 Building Inspection 559,305 674,642 838,165 Finance 328,395 401,988 486,883 Workforce Development 72,887 92,750 203,250 Downtown Development 204,353 256,394 - Information Technology 413,590 691,554 764,715 Facility Maintenance 638,784 878,235 925,250 Safety/Risk Management 229 - 10,500 Debt Service 1,119,090 2,511,964 2,102,597 Festival on Main - - 126,250 General Fund Expenditures 12,477,552 20,537,017 24,321,043 20 Ch anges t o Proposed Budget The approved FY23 Budget includes the following changes to the proposed budget: • The millage rate for FY22 for Jasper and Beaufort Counties was 112 mills. FY23 is a reassessment year for Jasper County. The preliminary millage rate for FY23 projected at 98.25 mills after calculating the reassessment rollback for Jasper County. Staff added the 4.7% CPI multiplier to the calculated rate for a proposed rate of 102.9 mills. • Council directed staff to prepare a balanced budget with a rollback millage rate of 97.0 mills (with no CPI multiplier) for Jasper County and to reflect the proporti onate decrease to the Beaufort County millage. • For FY23 The City’s millage rate for its Jasper County residents is 97.0 mills. For City residents in Beaufort County the millage rate is 109.2 mills. • The addition of a code enforcement officer position at mid -year was approved for the Planning Department. This position was not proposed in the City Manager’s budget. • Council made no changes to the City Manager’s proposed CIP budget. Budg et Trends • Public Safety - Police & Fire Department projected expenditures constitute the largest portion of General Fund Expenditures, comprising 35.24% of the total. • The Building Inspection D epartment continues to grow to support the City’s residential and commercial growth. The Department projects an increase of 24% as a result of a full Community Foundation - 175,000 580,758 State Accomm Tax Indirect 165,408 140,000 150,000 State Accomm Tax Direct 37,177 70,000 75,000 Local Accommodations Tax 338,841 1,126,373 1,166,373 Local Hospitality Tax 338,842 1,294,902 1,324,902 Hilton Head Lakes SAD 1,811,249 - - Investment and DA Fees 744,399 1,958,505 4,552,457 Five Year CIP Expense 4,782,958 6,364,633 14,325,471 Total Expenditures 20,696,426 31,666,430 46,496,004 FY 2021 Actual Pr oj ected FY 2022 FY 2023 Approved Budget Fund Balances General Fund Balance 399,813 2,836,327 2,836,327 Less ARPA unspent funds 1,212,219 1,265,315 1,624,108 1,571,012 Land Acquisition Fund 772,912 1,386,113 1,392,000 Economic Development Fund 293,089 235,836 237,000 Budget Stabilization 2,725,635 3,058,318 3,467,961 21 year of in creased staff costs. • The City’s Recreation Department projects an increase of 19% reflecting a full year of staffing and operational costs of the Recreation Center. Milla ge City Council has reduced the millage rate from 142 mills in FY14 to 97 mills for FY23. The reduction is noted on the ten-year millage rate comparison chart below. Ge neral Fund Balance The City’s General Fund balance for the most recent fiscal years along with the projections for FY22 and FY23 are as follows: Ten Year Millage Rate Comparison FY JASPER COUNTY SCHOOL OPERATIONS SCHOOL DEBT SERICE TOWN OF RIDGELAND CITY OF HARDEEVILLE 14 154 166 25 114.2 142 15 154 164 25 116.2 136 16 154 164 25 118.2 130 17 154 164 25 125.2 123 18 154 166 25 126.48 120 19 154 166 25 134.48 117 20 154 166 25 137.76 114 21 154 166 25 140.25 114 22 154 166 25 143.27 112 23 140 166 25 140 97 Jasper County reassement reflected in FY23 millage rates FY23 millage rates for City residents in each county are as follows: Jasper County - 97 mills Beaufort County - 109.2 mills 22 Revenue Projection City of Hardeeville staff projects revenue based on all available information. Projections are built analyzing past results (trends) coupled with an assessment of the anticipated impact of growth. Additionally, the projected impacts, if any, of events occurring in the greater economy (i.e., pandemic, supply and demand challenges, etc.) are also considered. Property taxes are the largest single revenue source for the City. Staff consults with both Jasper and Beaufort Counties regarding digest data and reviews permitting and home building activity the City is experiencing. General Fund Revenue Comparison Historical revenue trends are represented in the chart below. • The significant increase in Taxes is the result of the cont inued growth of the City’s tax base, particularly residential housing. • Local Option Sales Tax consists of funds received from the State of SC as a result of Local Option Sales Tax levies by the County. • Planning, Building & License increase reflects the ongoing growth in permitting and business license activity. • Other revenues (FY22 projected and FY23 Budget) include budget stabilization of $3,058,318 and $3,467,961, respectively. Budget stabilization is the City’s reserve of fund balance for unanticipated events. FY19 Actual FY20 Actual FY21 Actual FY22 Projected FY23 Budget Nonspendable 16,300 Restricted 8,482,358 6,237,001 293,385 1,212,219 1,265,315 Committted Fund Balance: Budget Stabilization 2,869,435 2,662,382 2,725,635 3,058,318 3,467,961 Economic Development Fund 332,911 332,911 797,912 235,836 237,000 Land A cquisition Fund 332,911 332,911 293,011 1,386,113 1,392,000 Total Committed Fund Balance 3,535,257 3,328,204 3,816,558 4,680,267 5,096,961 Unassigned 998,735 399,813 1,778,540 1,624,108 1,571,012 Total Fund Balances 13,032,650 9,965,018 5,888,483 7,516,594 7,933,288 FY19 Actual FY20 Actual FY21 Actu al FY22 Projected FY23 Budget Taxes 5,981,871 6,619,822 7,890,099 8,939,488 10,096,628 Licenses and permits 3,154,003 3,718,492 4,457,031 5,365,000 6,125,000 Intergovernmental 1,915,509 540,961 996,197 2,205,026 2,293,366 Fees 877,534 936,184 1,020,320 1,190,000 1,280,000 Charges for services 110,881 44,075 154,967 200,463 220,405 Investment income 288,259 216,895 19,726 15,000 15,000 Other revenues 157,762 799,510 502,105 4,958,857 4,290,644 Total Revenues 12,485,819 12,875,939 15,040,445 22,873,834 24,321,043 23 Other So urces of Revenue • In addition to the General Fund revenues summarized above, the City has other sources of revenue. Accommodation and Hospitality tax revenues are legally restricted for expenditures that promote parks. recreation and tourism in within the City. These special revenues are classified as nonmajor governmental funds. • Other nonmajor special revenue funds include the Fire Fund, Police Fund and Victims’ Assistance Funds. This revenue is restricted to the functions of the individual funds. • The City receives fees for funding various infrastructure projects and the increased service demands related to the City’s growth. These fees are paid pursuant to agreements between the City and developers. General Fund Expenditure Comparison Changes in departmental budgets are addressed in the Departmental Summaries that follow. The departmental expenditures are presented graphically below to provide a visual of where City funds are spent. 24 Departm ental Summaries Administration (General Government) The City of Hardeeville's Administration Department consists of the City Manager, Deputy City Manager, City Clerk, Deputy City Clerk, Administrative Services Director , Manager of Information Systems, CIP Project Manager and Human Resources Director. Collectively, the Administration Department works to manage the C ity's delivery of public services, direct and oversee the implementation of policy decisions, planning, and fiscal management. Additionally, the Department provides management of human resources, insurance, grants, risk management and special projects. Significant increases in the General Government budget include the increase in budget stabilization ($409,643) to meet the 20% of total expenditure requirement. Also included are increases in salary and benefit costs as a result of additional staff and transfers out. Police The City’s Police Department consistently provides a level of service that improves the quality of life for the residents and visitors of the City. The Police Department staffing totals thirty -seven positions and includes: (34) sworn officers, (1) Victims Advocate and (2) Records Specialists. Included in the above staffing are four new patrol positions approved by Council for FY23. Most of the Department’s increase relates to salaries, benefits and related equipment for four new officers. Fire The City of Hardeeville Fire Department is responsible for providing for the safety and security for its citizens, the community, and neighboring areas to reduce or eliminate loss associated with fires, emergencies, and disasters. The Fire Department total annual average run volume is 1800 calls with rescues and emergency services making up more than two-thirds of the total call volume. The City has three fire stations and approved staffing of 43 paid professional firefighters. With Hardeeville’s continued growth, the City plans to open its fourth fire station in early FY23. The new station will service the Southern portion of the City and the new industrial developments along US 17. The cost of staffing and operating the new station accounts for the bulk of the Department’s budget increase. Public Works The City of Hardeeville Public Works Department provides management, maintenance, and repair services for infrastructure within the City as well as City vehicles, equipment, and facilities. Regular services include right -of-way mowing and trimming, maintenance and repair 25 of the Ci ty’s storm drainage system, management and maintenance of public buildings, maintenance of parks and public open space, and management of City fleet vehicles and heavy equipment. The Public Works Department also has the responsibility of logistics, setup and take down of special events, festivals, and celebrations. The Public Works Department consists of thirteen (13) staff including the Public Works Director, Operations Manager, Maintenance Supervisor and nine Maintenance Technicians. The Public Works Director works to implement various capital improvement projects assisting each of the City's Departments with variou s budgeting, design, construction, and project management as these projects are developed. In FY23, the Public Works Department will increase the level and quality of maintenance and inspection of the City’s stormwater system. This will be accomplished by reorganizing the department, adding a Maintenance Technician and outsourcing City grounds maintenance. This will provide existing staff the opportunity to focus on maintenance tasks such as the stormwater drainage system. The reorganization is in orde r as the Department prepares to add a Stormwater Management division to address the upcoming MS4 requirements. That cost, along with the increase in services to keep up with the City’s growth, account s for most of the increase in the FY23 budget for the Department. Parks, Recreation and Tourism The Parks, Recreation and Tourism (PRT) Department manages various facilities, programs, and activities providing recreational opportunities for residents and visitors of Hardeeville. Through utilization of its parks, open spaces, facilities, programs, and cultural resources, PRT promotes opportunities that make Hardeeville a more desirable place to live, work and play. Responsibilities of the Department include establishing and managing facilities, parks, festivals, special events, athletics, and programming for all ages while delivering the four pillars of CARE: Creating economic impacts, Advancing conservation, Rejuvenating health and wellness, and Enhancing the quality of life for the City's residents and visitors alike. The PRT Department staffing consists of five full time staff: the PRT Director, the Programs and Events Manager , and the Recreation Center Manager . Additionally, the Recreation Center is staffed with seven part time Recreation Center Guest Specialists. PRT is responsible for providing the community with events such as the Hardeeville Festival on Main and Fourth off Main. The City’s 35,000 square foot Recreation Center opened in FY22. This facility has enabled Hardeeville to provide a wide range of recreational and fitness activities to it citizens and visitors alike. The increase in staff costs, supplies and services account for most of the PRT budget increase. 26 City Cou ncil The City Council budget decrease reflects the City’s second year support of the Affordable Housing Trust Fund being much lower than the initial contribution to that multi -jurisdictional, regional effort. Municipal Court The Municipal Court is a branch of South Carolina Court Administration and serves as the judicial system for the City of Hardeeville. This court handles traffic and criminal misdemeanor violations as well as City ordinances. The Municipal Court consist of three (3) staff, the Municipal Court Judge and two (2) Court Clerks. The Court’s nominal budget increase reflects salary and benefit cost increases. Planning The mission of the Planning Department is to promote managed growth and in the City of Hardeeville by maintaining a comprehensive planning program. This is accomplished by maximizing zoning and permitting, coordinat ing the provision of public services, and striving to optimize the quality of life for all City residents while maintaining full compliance with City codes and ordinances. The Planning Department has absorbed the former Downtown Development D epartm ent. Planning staff is comprised of the Planni ng Director, Planning Manager, Planner, Planning Technician, Permit Technician and Code Enforcement Technician. For FY23, increased engineering costs accounts for much of the Planning budget increase. These additional costs will facilitate work on the M ZDO (Municipal Zoning and Development Ordinance) update. Media The City of Hardeeville Media Department has several responsibilities. Primarily, the Department provides information regarding events occurring in the City to promote City initiatives, foster a culture of engagement, maximize communications resources, and ensure a unified City message. The Media Department plays a significant role in promoting transparency and fostering trust between the City and the community it serves. The Media Department records and promotes events and activities throughout the City and neighboring communities. These events are aired live on the City’s government access television station (HTVN) and rebroadcast later as scheduling permits. Station programming is updated continuously. The Department is also responsible for the management of the City's website and social media platforms. The Media Department consists of three (3) staff, a Director, Media Technician and Web Content/Media Specialist. The slight increase in the Media Department budget reflects the expectation the D epartment will be fully staffed in FY23. 27 Building Inspection The Department reviews projects, ensures code compliance, conducts inspections and issues permits on existing properties and new building projects. The Department is staffed by the Building Official, Deputy Building Official, Plans Examiner, five full -time Building Inspectors and one part-time Building Inspector. The increase in the Department’s budget reflects ful l staffing for the year and the addition of the fifth full-time inspector position to be added in mid FY23. Finance The Fin ance Department is committed to providing timely, accurate, and complete information to Council, the City Manager, and staff to facilitate decision making. The Department is responsible for maintaining the general ledger, biweekly payroll production, and processing accounts receivable and accounts payable. Other responsibilities of the department include preparing the City's Annual Comprehensive Financial Report ( ACFR), preparation of the City's annual budget, Business License administration, administration of the Local Accommodations Tax and Local Hospitality Tax programs and providing staff liaison to the Accommodations Tax Committe e. The Finance Department consists of four staff: the Finance Director, Senior Accountant, Accounts Payable Clerk and Business License Coordinator. The change to the Department budget reflects the anticipated addition of a Tax Collector position at mid-year. Workforce Development The City’s Workforce Development Program will continue to provide training in welding and commercial driver’s license (CDL). For FY23 the program anticipates providing 45 students CDL training and 15 students welding certification training. The program has no employees and is overseen by the Administrative Services Director. Information Technology The Information Technology (IT) Department, led by the IT Manager, will add a Network Administrator in FY23. The Departmen t supports the various, wide -ranging hardware and software needs of the City and its employees. The budget increase for the Department reflects the addition of its second employee. Facility Maintenance Facility Maintenance is responsible for the maintenance and utilities for all City buildings. The Department has no employees and is overseen by the Public Works Director. 28 The bud get reduction reflects a full year of experience with the Recreation Center utilities and outside services. Safety and Risk Management This Department has no employees and is overseen by the Administrative Services Director. A slight increase in operating costs is anticipated in FY23. Debt Service Principal and Interest payments on City Debt are accounted for in this Department. Debt Service has no employees and is overseen by the Finance Director. The City utilizes various funding sources to achieve these outcomes including voluntary developer agreement fees, grants, and loans. The largest project in its history, the Recreation Center opened in early FY22, and was funded with Accommodation (ATAX) and Hospitality Taxes (HTAX) and developer funds. Additional projects include improvements to Hardeeville Commerce Park and Improvement to the Exit 8 and US 278 Corridor Area Phase I with total project cost of approximately $15 million. Fire Station 84 will open in mid FY23 and will serve the southern portion of the City. The City is also working to obtain funding for the new I-95 Exit 3 project, an $85 million project that the City is developing in partnership with Jasper County, the S tate of South Carolina and private developers. Festival on Main Beginning FY23 the City elected to captu re costs for its largest even t, Festival on Main, in a separate cost center. PERSONNEL SUMMARY The FY23 budget adds twelve full-time equivalents (FTE) to City staff. These additions include: Police Department - 4 Patrol Officers. Fire Department - 3 Fire Firefighters Public Works.- 1 Maintenance Technician Planning & Development Department – 1 Senior Planner & 1 Code Enforcement Officer Finance – 1 Tax Administrator Information Technology – 1 Network Administrator The City adjusts staffing levels as necessary to assure the increased demand for services is met . Since 2018, the City's FTE have increased from ninety-four to one hundred twenty-five. Staffing changes over the last five years are indicated on the chart below. 29 CAPITAL I MPROVEMENT PLAN With the goal of providing a competent, comprehensive project assessment, Department Heads were challenged to develop a five- year Capital Improvement Plan rather than consider only immediate, upcoming year needs. The plan that follows provides approved CIP items for FY23 as well as a snapshot into anticipated future needs. The CIP is provided on the pages that follow. STAFFING BY FISCAL YEAR 2019 2020 2021 2022 FY23 General Government 5 5 5 7 7 Planning/Development Services 4 4 4 3 7 Downtown Development 3 3 3 3 - Media 3 3 3 3 3 Fire Department 34 34 34 40 43 Police Department 26 28 30 33 37 Courts 2.5 2.5 2.5 3 3 Public Works 12 12 11 12 12 Parks and Recreation 2 3 7.5 8.5 9.5 Building Inspection 4.5 5.5 6.5 7.5 8.5 Management Information Systems 0 0 1 1 2 Finance 3 3 3 4 5 99 103 110.5 125 137 30 Department Project Number Project Name FY23 FY24 FY25 FY26 FY27 Five Year Total City Council Approved General Government 23-001 Municipal Hub 300,000 2,380,000 3,603,485 914,380 1,052,155 8,250,020 300,000 General Government 23-002 City Hall Expansion 500,000 500,000 3,180,000 3,180,000 3,180,000 10,540,000 500,000 General Government 23-003 Argent Boulevard at Short Cut Road Intersection Improvements 1,570,000 - - - - 1,570,000 1,570,000 General Government 23-004 Argent Boulevard/East Argent Parkway Intersection Improvements 850,000 - 300,000 - - 1,150,000 850,000 General Government 23-005 Highway 170 Corridor Project 500,000 - - - - 500,000 500,000 Police 23-006 Upgrade Training Facility 20,000 - - - - 20,000 20,000 Police 23-007 Police Bay & Vault Renovation 840,500 - - - - 840,500 840,500 Police 23-008 City Wide Camera System 100,917 - - - - 100,917 100,917 Police 23-009 Axon Officer Safety Plan 99,701 99,701 78,144 - - 277,546 99,701 Police 23-010 New Police Headquarters 28,310,000 - - - - 28,310,000 Fire 23-011 Station 82 Rebuild 1,000,000 - - - - 1,000,000 1,000,000 Fire 23-012 Fire Dept Ballistic Protection 45,000 - - - - 45,000 Fire 23-013 Ambulance Program 300,000 - 300,000 - 300,000 900,000 300,000 Fire 22-014 Replace 2006 Ford F-150 - 80,000 - - - 80,000 Fire 23-015 Vulnerability Assessment 20,000 - - - - 20,000 Fire 23-016 EOC Training Evaluation 12,000 - - - - 12,000 Fire 23-017 Hurricane Shutters 18,000 - - - - 18,000 18,000 Fire 23-018 Fire Staion 85 - 3,500,000 - - - 3,500,000 Fire 23-019 Public Safety Training Facility - - 5,000,000 - - 5,000,000 Fire 23-020 City Dispatch Center - - 250,000 - 10,000,000 10,250,000 Fire 23-021 Fire Station 84 Expansion - 3,500,000 - - - 3,500,000 Public Works 23-022 City Building Access Control & Security 75,000 75,000 75,000 75,000 - 300,000 75,000 Public Works 23-023 Roadway Holiday Decorations 121,670 - - - - 121,670 121,670 Public Works 23-024 Public Works Parking Paving 110,000 - - - - 110,000 Public Works 23-025 Stormwater Managment Division - 250,000 200,000 150,000 - 600,000 Public Works 23-026 Highway 17 Pump Station Upgrades 350,000 300,000 - - - 650,000 Public Works 23-027 Presbyterian Church Property and Building Improvements 689,000 289,000 - - - 978,000 Public Works 23-028 Public Works Facility Renovations 175,000 75,000 - - - 250,000 Public Works 23-029 Street Maintenance Division - 250,000 250,000 250,000 - 750,000 Public Works 23-030 Replace Compact Track Loader 75,000 - - - - 75,000 75,000 Public Works 23-031 Replace 4 Zero Turn Mowers 65,576 16,395 16,395 16,395 16,395 131,156 65,576 Public Works 23-032 Purchase of a 10' Rotary Mower 11,000 - - - - 11,000 11,000 31 Department Project Number Project Name FY23 FY24 FY25 FY26 FY27 Five Year Total City Council Approved Public Works 23-033 Purchase of a Brush Cutter Attachment 10,000 - - - - 10,000 10,000 Public Works 23-034 Recreation Complex Pump Station 200,000 - - - - 200,000 200,000 Public Works 23-035 Finance Department Renovations 18,000 - - - - 18,000 18,000 Public Works 23-036 Purchase of a Backhoe 180,000 - - - - 180,000 Public Works 23-037 Purchase of a Vacuum Truck 425,000 - - - - 425,000 Public Works 23-038 US 278 - Lattitude/Lakeside Turn Lanes 924,500 - - - - 924,500 924,500 Public Works 23-039 Fire Station 81 HVAC Modifications 42,800 - - - - 42,800 42,800 Public Works 23-040 Media Studio Space 50,000 - - - - 50,000 50,000 Public Works 23-041 Boyd Street Sidewalk 300,000 - - - - 300,000 Recreation 23-042 RG Park Complex Overview 2,484,000 2,704,000 3,070,500 5,020,000 6,460,000 19,738,500 635,000 Recreation 23-043 Alta Bike Pedestrain Trails Master Plan 680,000 2,315,000 396,000 750,000 680,000 4,821,000 680,000 Recreation 23-044 Millstone Landing 65,000 - 248,000 - 2,935,000 3,248,000 Recreation 23-045 East Argent 1330 Conservation Easement 50,000 65,000 1,000,000 950,000 900,000 2,965,000 50,000 Recreation 23-046 East Argent Rec Plex - - 65,000 2,500,000 4,900,000 7,465,000 Recreation 23-047 Recreation Center 90,000 125,000 100,000 - - 315,000 90,000 Recreation 23-048 Rec Center Drive and Parking 175,000 - - - - 175,000 175,000 Recreation 23-049 PRT Department Comprehensive Master Plan 60,000 60,000 - - - 120,000 Planning 23-050 Whyte Hardee Boulevard Master Plan 552,800 663,070 319,000 301,350 326,300 2,162,520 552,800 Media 23-051 AV Equipment Update-Council Chambers 40,000 - - - 55,000 95,000 40,000 Media 23-052 Media Studio Space Furnishing 20,000 - - - - 20,000 20,000 Information Tech 23-053 Inter Connect All City Facilities via Fiber 90,000 90,000 - - - 180,000 90,000 All 23-054 Fleet Management 216,632 307,890 451,021 562,912 562,912 2,101,367 216,632 42,832,096 17,645,056 18,902,545 14,670,037 31,367,762 125,417,496 10,242,096 32 City of Hardeeville Capital Improvement Program Project # 23-001 Project Name Municipal Hub Type: Infrastructure Department: General Government Useful Life: 40 years Contact: Matt Davis Category: Building & Structures Priority: Planned Improvement Location: Downtown Year Submitted: FY21 Status: Description Justification Budget Impact/Other Create a municipal complex featuring City-owned buildings and public park space that is cohesive and will ultimately connect with a revitalized Whyte Hardee Boulevard. This is a planned improvement spurred by the interest in developing a Veterans Park as the first phase. The project will be a multi-year endeavor. FY23 $300,000 for engineering and design of Veterans Park, FY24 Construct Veteran's Park, FY25 Design and construct event park and Dasher Lane streetscape, FY26 Design and construct Linear Park and playground, FY 27 Design and construct Martin Street improvements FY23 through FY27 Proposed 33 Project # 23-001 Project Name Municipal Hub Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Engineering and Design 300,000 - 470,000 119,267 137,272 1,026,539 Construction - 2,380,000 3,133,485 795,113 914,883 7,223,481 300,000 2,380,000 3,603,485 914,380 1,052,155 8,250,020 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL American Rescue Plan Act Funds 300,000 300,000 General Fund/ Financing 2,380,000 3,603,485 914,380 1,052,155 7,950,020 300,000 2,380,000 3,603,485 914,380 1,052,155 8,250,020 34 City of Hardeeville Capital Improvement Program Project # 23-002 Project Name City Hall Expansion Type: Infrastructure Department: General Government Useful Life: 40 years Contact: Category: Building & Structures Priority: Location: Year Submitted: FY22 Status: Description Justification Budget Impact/Other Design and build City Hall expansion. The current City Hall is at capacity as far as accomodating new staff. An addition or annex to City Hall will allow for a additional office space, permanement dedicated space for the Media Department including a studio and a larger City Council Chambers. Renovations will also be included for the existing building creating more efficiencies and more meeting space. The new space will be approximately 14,400 square feet. The City's workforce has grown and there is no longer enough space for new employees and the need for additional meeting spaces has also increased. The Media Department is also in dire need of a permanent home with an adquate studio to produce new content and deliver vital information to a growing city. FY23 and FY 24 $500,000 each year for engineering and design of City Hall expansion, FY25 Construction FY26 Construction. FY23 through FY27 Matt Davis Planned Improvement Proposed 35 Project # 23-002 Project Name City Hall Expansion Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Engineering and Design 500,000 500,000 - - - 1,000,000 Construction - - 3,180,000 3,180,000 3,180,000 9,540,000 500,000 500,000 3,180,000 3,180,000 3,180,000 10,540,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/ Financing 500,000 500,000 3,180,000 3,180,000 3,180,000 10,540,000 500,000 500,000 3,180,000 3,180,000 3,180,000 10,540,000 36 City of Hardeeville Capital Improvement Program Project # 23-003 Project Name Argent Boulevard at Short Cut Road Intersection Improvements Type: Infrastructure Department: Useful Life: 20 years Contact: Category: Roadway Improvements Priority: Location: City Hall Year Submitted: FY23 Status: Description Justification Budget Impact/Other A recent Argent Boulevard Corridor Study identified the Argent/Jasper Station/Short Cut Road intersection as meeting the warrants for a fully signalized intersection. This project will add both turning lanes at all legs of the intersection and include the installation of a traffic signal. Regional traffic growth coupled with the increased development activity in the East Argent area has led to difficult turning movements and several collisions. Adding turning lanes and a signal will provide a safer means to cross this offset intersection and create gaps in traffic along Argent Boulevard to provide more opportunities for other turning movements. All horizonal improvments (turns lanes and widenting) will be paid from existing Development Agreement Fees and one-time contributions from developers of projects in the area. SCDOT will fund the signal equipment. FY23 through FY27 General Government Matt Davis Safety Improvement Proposed 37 Project # 23-003 Project Name Argent Boulevard at Short Cut Road Intersection Improvements Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction (turn lanes) 1,220,000 - - - - 1,220,000 Signal Installation 350,000 - - - - 350,000 1,570,000 - - - - 1,570,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Developer Agreement Fees 1,220,000 - - - - 1,220,000 SCDOT 350,000 - - - - 350,000 1,570,000 - - - - 1,570,000 38 City of Hardeeville Capital Improvement Program Project # 23-004 Project Name Argent Boulevard/East Argent Parkway Intersection Improvements Type: Department: Useful Life: 20 years Contact: Category: Roadways Priority: Location: City Hall Year Submitted: FY23 Status: Description Justification Budget Impact/Other This is a multi-year project consisting of the addition of turning lanes and ultimately the installation of a traffic signal. Development Fees have been collected and will be used to pay for the design and construction of the turning lanes. When signal warrants are met the traffic lights will be installed. Regional traffic growth on Argent Boulevard coupled with development in the East Argent area have created a need for roadway improvements. Turns from side streets have become increasingly difficult and have been a contributor to collisions. Adding turning lanes will help mitigate these conditions until a full signal is warranted. This project will be funded with Developer Agreement fees. FY23 through FY27 General Government Matt Davis Safety Improvement Proposed 39 Project # 23-004 Project Name Argent Boulevard/East Argent Parkway Intersection Improvements Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Engineering and Design 250,000 - - - - 250,000 Construction 600,000 - 300,000 - - 900,000 850,000 - 300,000 - - 1,150,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Developer Agreement Fees 850,000 - 300,000 - - 1,150,000 850,000 - 300,000 - - 1,150,000 40 City of Hardeeville Capital Improvement Program Project # 23-005 Project Name Highway 170 Corridor Project Type: Improvement Department: Useful Life: 20 years Contact: Category: Roadway Improvements Priority: Location: City Hall Year Submitted: FY23 Status: Description Justification Budget Impact/Other The recently adopted Highway 170 Access Management Plan included six near-term improvements to the 170 corridor between Highway 278 and SC 462. Five projects remain to be completed. Beaufort County is managing the implementation of the various improvments and has asked both Hardeeville and Jasper County to participate. The City has been asked to contribute $500K toward the projects. Regional traffic growth along Highway 170 has been significant in recent years. New development along the corridor has contributed to both increased volume and turning movements. The Access Management Plan seeks to eliminate certain conflicts and create safer conditions for others while allowing for the safer flow of traffic. Beaufort County has asked for $500,000 from the City. $250,000 will come from the "Good Neighbor Fund" proposed by Beaufort County as part of the County's distribution of its ARPA funds. The remaining $250,000 will be paid using the City's ARPA funds. FY23 through FY27 General Government Matt Davis Safety Improvement Proposed 41 Project # 23-005 Project Name Highway 170 Corridor Project Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Roadway Improvements 500,000 - - - - 500,000 500,000 - - - - 500,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Beaufort County Good Neighbor Grant 250,000 - - - - 250,000 ARPA Funds 250,000 - - - - 250,000 500,000 - - - - 500,000 42 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-006 Project Name Upgrade Training Facility Type: Upkeep/Renovation Department: Useful Life: Ongoing Contact: Category: Building & Structures Priority: Location: Purrysburg Road Reason: Year Submitted: 2022 Status: Description Justification Budget Impact/Other The project calls for the upgrade and renovation of the existing structure at the training facility on Purrysburg Road. The main structure on the property has been utilized for various training activities. Over the course of years, this structure has suffered damage and requires repairs for it to be a viable, functioning training facility. Upgrades to the front porch, flooring, and walls will ensure safety and continued use. Project funding will be provided by the General Fund. Police Chief Woodward Public Safety Training Proposed 43 Project # 23-006 Project Name Upgrade Training Facility Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Building Material/Installation 20,000 - - - - 20,000 Total 20,000 - - - - 20,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund 20,000 - - - - 20,000 20,000 - - - - 20,000 44 City of Hardeeville Capital Improvement Program FY23 through FY23 Project # 23-007 Project Name Police Bay & Vault Renovation Project Type: Improvement Department: Police Useful Life: 20 Years Contact: Woodward Category: Building & Structures Priority: Public Safety Location: Police Department/ Martin Street Reason: Safety Year Submitted: FY23 Status: Proposed Description CONTINUED ON FOLLOWING PAGE Project calls for the expansion of the bay to provide needed office space for detectives and the construction of an evidence vault to properly secure evidence. 45 Project # 23-007 Project Name Police Bay & Vault Renovation Justification Budget Impact/Other Currently the Hardeeville Police Department houses its 3 Investigators in 250 Square feet of office space. This space includes the investigators workspace, investigations equipment and supply as there is no other place in the current building to house these items. Space is extremely limited and as a result investigator often create disturbances while trying to complete work and speak to Victims, Suspects, and Witnesses on the phone, or just conduct business as usual. Along with the limited space, Investigators commonly must use the Data master room to conduct interviews which is sometimes pre occupied and in view of the public. With this added space, Investigators will be able to pursue job assignments, be more thorough in their investigations, be able to conduct interrogations and interviews in a better, more secure setting. This will also allow investigators to have a meeting space for Investigators from outside sources to collaborate and maintain the integrity of active investigations / operations. The current setting does not allow for special operations briefings or meetings, in which we are constantly requesting the fire department training room for this business, which in return does not allow us to protect the integrity of these investigations / operations. The evidence vault is currently housed in the upstairs attic over the patrol room. This room is extremely small and is not of sufficient size to house the intake of evidence. As you are aware evidence must be maintained by the South Carolina Law Enforcement Division guidelines and with the current room it is nearly impossible to do. Evidence weapons such as rifles are tagged and placed in a corner of the room, and evidence is stored in bins which contains evidence from earlier cases. Temporary evidence lockers are currently stored in the hallway outside of the Patrol Room. With the addition of the evidence vault, the Hardeeville Police Department can begin to streamline its evidence intake process, create a better more secure area for evidence, to include being able to store weapons and narcotics safely and appropriately. Staff would like to use DA fees to fund this project. Investigators would be better able to fulfill their job duties with the completion of this project. Evidence would be properly secured. 46 Project # 23-007 Project Name Police Bay & Vault Renovation Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning and Consultants 100,000 - - - - 100,000 Renovation of Bay 250,500 - - - - 250,500 Furnishings 40,000 - - - - 40,000 Construction of Vault 450,000 - - - - 450,000 840,500 - - - - 840,500 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 840,500 - - - - 840,500 840,500 - - - - 840,500 47 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-008 Project Name City Wide Camera System Project Type: City Wide Camera System Department: Police Useful Life: 10 years Contact: Woodward Category: Security for the City Priority: Public Safety Location: Main Street to Exit 5 Year Submitted: FY23 Status: Ongoing Description Justification Budget Impact/Other Implementation of the City wide camera system began in FY21. This threee year project continued in FY22 and will be completed in FY23. Remote Technlogy was awarded a bid to install security cameras throughout the City over a three year period. The Camera system is being funded with DA fees. 48 Project # 23-008 Project Name City Wide Camera System Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL City Wide Camera System 100,917 - - - - 100,917 100,917 - - - - 100,917 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 100,917 - - - - 100,917 100,917 - - - - 100,917 49 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-009 Project Name Axon Officer Safety Plan Type: Improvement Department: Police Department Useful Life: 5 years Contact: Chief Sam Woodward Category: Equipment Priority: Public Safety Location: Police Department Year Submitted: FY22 Status: Continuation Description Justification Budget Impact/Other Proposed year two costs are $99,701 paid with DA funds. Officer Safety Plan through Axon enables the Department to establish one contract for the Police Department for tasers, body cameras, and fleet in car systems. FY23 will be the scond year of the five year program. To consolidate all Axon contracts into one streamlined contract that covers all axon body cameras, tasers, and in car cameras. This safety plan enables the Police Department to update all body cameras and taser equipment in 2021, and begin the process of having all upgrades in 2.5 years, and the 5 year mark. This covers lost or broken equipment at no cost, and provides taser training and duty cartridges at no cost. Expenditures for all years are to continue rotation of all equipment, replacement, storage, and licensing. 50 Project # 23-009 Project Name Axon Officer Safety Plan Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Officer Safety Program 99,701 99,701 78,144 - - 277,546 99,701 99,701 78,144 - - 277,546 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Funds 99,701 99,701 78,144 - - 277,546 99,701 99,701 78,144 - - 277,546 51 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-010 Project Name New Police Headquarters Project Type: Building & Structures Department: Police Useful Life: 50 Years Contact: Sam Woodward Category: Building & Structures Priority: Public Safety Location: TBD Reason: Inadequate Space Year Submitted: FY23 Status: Proposed Description Justification Project calls for the construction of a new headquarters facility for the Hardeeville Police Department. The construction for a new state of the art police station is a necessity. The department consists of 34 employees and will continue to grow. The current building is at full capacity even with the renovation planned for 2022. According to Planning and Development, the population of Hardeeville is projected to grow to around 30,527 citizens. FBI statistics show that there are typically 3.4 officers to every 1,000- citizen ratio. Using this formula, the department should consist of approximately 88 officers to effectively manage this population growth. We are looking to build this new department for year 2023 with the future in mind. To effectively lead the added officers, command staff with increase. Office space for the command staff is not possible in the current building. The number of detectives and administration assistants with increase. Space is not feasible in the current building. Patrol officers have outgrown the patrol office and we are even using closet space for an officer’s office. The current building is inadequate to support parking, handicapped parking, equipment storage and every day operational equipment for the projected department size. 52 Project # 23-005 Project Name New Police Headquarters Justification continued Budget Impact/Other Possible funding sources include DA Fees, Local Tax Funds, State and Federal Grants or borrowed funds. This new police station will house a sizable classroom for in house as well as provide the opportunity to host outside agencies for training and seminars. This will create a positive environment within the law enforcement community. This space will be utilized for public meetings and engagement, essentially breaking community, and law enforcement barriers as we welcome them to our facility. We currently use the court room for department meetings and have no space for training or community activities. An indoor firing range will be included in this building. We currently pay for and outsource a gun range for qualifications and training. This will prove more difficult as more officers are added as the gun range time would be limited. A private parking garage will be constructed. This parking garage will be secure and restricted to law enforcement only. The current parking situation is unsafe and absolutely unsecure for our officers and their equipment. This will also control the flow of both traffic and pedestrian visitors to the building. The Hardeeville Police Department is also housed with the Hardeeville Municipal Court which is a conflict of interest in the eyes of the public and should be separated. The separation from the two is most noted in the three forms of government, the police department being the executive branch and the court system being the judicial branch. With the proper funding secured and invested into the new building, the department will enjoy many years of operation without concern for another expansion. 53 Project # 23-010 Project Name New Police Headquarters Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning and Consultants 2,467,000 - - - - 2,467,000 Police Department 24,843,000 - - - - 24,843,000 Land Acquisition 1,000,000 - - - - 1,000,000 28,310,000 - - - - 28,310,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Grant Funding 5,000,000 - - - - 5,000,000 Fund Balance 18,310,000 - - - - 18,310,000 DA Fees 5,000,000 - - - - 5,000,000 28,310,000 - - - - 28,310,000 54 City of Hardeeville Capital Improvement Program Project # 23-011 Project Name Station 82 Rebuild Type: Replacement Department: Useful Life: 30 years Contact: Category: Building & Structures Priority: Location: FS82 Reason: Year Submitted: 2022 Status: Description Justification Budget Impact/Other Station is being demolished due to mold and poor condition of the living quarters. We need to rebuild the living quarters. Station 82 is in disrepair and is being demolished. Public Safety is at risk everyday this station is not operational. Funding to be provided by bond financing. FY23 through FY27 Fire Steve Camp Public Safety Safety 55 Project # 23-011 Project Name Station 82 Rebuild Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 1,000,000 - - - - 1,000,000 1,000,000 - - - - 1,000,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Bond Financing 1,000,000 - - - - 1,000,000 1,000,000 - - - - 1,000,000 56 City of Hardeeville Capital Improvement Program Project # 23-012 Project Name Fire Dept Ballistic Protection Type: Equipment Department: Useful Life: 5 years Contact: Category: Building & Structures Priority: Location: Downtown Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other To purchase ballistic protection for all firefighters. With the current issues around the county, it is proving necessary to provide protection for our Firefighters for the higher risk calls. Most of the time our firefighters are the first on a scene and there are increasing number of attacks on firefighters. this will provide the protection needed for day to day calls and for the unwanted mass shooting scene. Funding $45,000 purchase with DA fees. FY23 through FY27 Fire Steve Camp Planned Improvement Safety Proposed 57 Project # 23-012 Project Name Fire Dept Ballistic Protection Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 45,000 - - - - 45,000 45,000 - - - - 45,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 45,000 - - - - 45,000 45,000 - - - - 45,000 58 City of Hardeeville Capital Improvement Program Project # 23-013 Project Name Ambulance Program Type: Replacement Department: Useful Life: 5 years Contact: Category: Automobiles & Trucks Priority: Location: FS83 Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other Purchase of Ambulances The state of EMS in the County is not sufficient to provide a quality service to the citizens of Hardeeville. We need to supliment the County system with our own ambulances. We can provide a better service to our citizens. The cost per ambulance is $300,000. Proposal is to purchase an ambulance in FY23, FY25 and FY27. FY23 through FY27 Picture or Graphic Fire Steve Camp Public Safety Safety Proposed 59 Project # 23-013 Project Name Ambulance Program Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 300,000 - 300,000 - 300,000 900,000 300,000 - 300,000 - 300,000 900,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 300,000 - 300,000 - 300,000 900,000 300,000 - 300,000 - 300,000 900,000 60 City of Hardeeville Capital Improvement Program Project # 22-014 Project Name Replace 2006 Ford F-150 Type: Replacement Department: Useful Life: 5 years Contact: Category: Automobiles & Trucks Priority: Location: FS81 Reason: Year Submitted: 2022 Status: Description Justification Budget Impact/Other Replacement of 2006 Ford F-150 (Utility 82) utility truck. This is a replacement for current old pickup truck. We are looking to make this a F350 or F550 to increase our capabilities. The larger pickup truck will allow the vehicle to tow larger trailers. $80,000 or purchase through Enterprise. Not sure of cost through Enterprise. FY23 through FY27 Fire Steve Camp Public Safety Safety Proposed 61 Project # 22-014 Project Name Replace 2006 Ford F-150 Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase - 80,000 - - - 80,000 - 80,000 - - - 80,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees - 80,000 - - - 80,000 - 80,000 - - - 80,000 62 City of Hardeeville Capital Improvement Program Project # 23-015 Project Name Vulnerability Assessment Type: Improvement Department: Useful Life: 5 years Contact: Category: Priority: Location: Downtown Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other The City of Hardeeville is a rapidly changing/growing municipality that will continue to see increasing hazards & threats that will impact the City on a larger scale than everyday calls for service. These larger scale events have created a need for a comprehensive hazard vulnerability assessment to measure our weaknesses and see where we need to make improvements. A comprehensive hazard vulnerability assessment by a third party is highly beneficial to the City of Hardeeville as one has never been done before, it is important to know and understand the location, probability and valuation of hazards and vulnerabilities, will also help mitigation efforts, and provides a roadmap for implementation. There is not sufficient staff to conduct this study, and a third party would be impartial and concentrated in their efforts. Budget impact would be approx $20,000 every 5 years to conduct assessment, or as needed due to growth. FY23 through FY27 Emergency Management Steve Camp Public Safety Community Benefit Proposed 63 Project # 23-015 Project Name Vulnerability Assessment Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 20,000 - - - - 20,000 20,000 - - - - 20,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 20,000 - - - - 20,000 20,000 - - - - 20,000 64 City of Hardeeville Capital Improvement Program Project # 23-016 Project Name EOC Training Evaluation Type: Improvement Department: Useful Life: 5 years Contact: Category: Training Priority: Location: Downtown Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other The City of Hardeeville Emergency Operations Center (EOC) strives to engage in aggressive and meaningful training for it's EOC personnel. While this training generally covers the five main areas: Prevention, Mitigation, Preparedness, Response, Recovery there is a need to evaluate personnel on competencies and performance while providing feedback, increased skills and direction for the future made possible by an outside subject matter expert. A third party vendor is able to provide real-life scenarios tailored to the hazards we face, creating the needed training for personnel. All personnel regardless of position will be able to function in their role, w/o the need for EOC leaders to be involved in hosting the event. The impact to the budget should be approx. $12,000 every 5 years for evaluation/training, based on growth of City. FY23 through FY27 Emergency Management Steve Camp Improve Service Community Benefit Proposed 65 Project # 23-016 Project Name EOC Training Evaluation Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 12,000 - - - - 12,000 12,000 - - - - 12,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 12,000 - - - - 12,000 12,000 - - - - 12,000 66 City of Hardeeville Capital Improvement Program Project # 23-017 Project Name Hurricane Shutters Type: Improvement Department: Useful Life: 20 years Contact: Category: Building & Structures Priority: Location: Downtown Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other Install hurricane shutters on all emergency services buildings. 4 Fire Stations, EOC/HQ, and Police Dept. We have personnel staying in these buildings during Hurricanes, it is imperative that we protect them. $18,000 FY23 through FY27 Emergency Management Steve Camp Planned Improvement Safety Proposed 67 Project # 23-017 Project Name Hurricane Shutters Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 18,000 - - - - 18,000 18,000 - - - - 18,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 18,000 - - - - 18,000 18,000 - - - - 18,000 68 City of Hardeeville Capital Improvement Program Project # 23-018 Project Name Fire Staion 85 Type: Improvement Department: Useful Life: 20 years Contact: Category: Building & Structures Priority: Location: Various Reason: Year Submitted: 2022 Status: Description Justification Budget Impact/Other Build Fire STA 85 in the East Argent tract HFD will need to build fire station 85 to provide coverage to the ever expanding City of Hardeeville. This will also allow for proper ISO ratings/coverage. $3,500,000 FY23 through FY27 Fire Steve Camp Public Safety Safety Proposed 69 Project # 23-018 Project Name Fire Staion 85 Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction - 3,500,000 - - - 3,500,000 - 3,500,000 - - - 3,500,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees - 3,500,000 - - - 3,500,000 - 3,500,000 - - - 3,500,000 70 City of Hardeeville Capital Improvement Program Project # 23-019 Project Name Public Safety Training Facility Type: Improvement Department: Useful Life: 20 years Contact: Category: Building & Structures Priority: Location: FS85 Reason: Year Submitted: 2022 Status: Description Justification Budget Impact/Other Build HFD Training Facility in conjunction with Fire STA 85 HFD and HPD need a permanent training facility in order to conduct realistic, mandated, and OSHA/NFPA compliant training. This facility could be built in conjunction and on the same site as Fire STA 85. This would also eliminate the need for impromtu temporary training sites behind other fire stations. This facility could also incorporate training for other City departments and eliminate down time/travel time for fire apparatus going out of district. $5,000,000 FY23 through FY27 Picture or Graphic Fire Steve Camp Public Safety Safety Proposed 71 Project # 23-019 Project Name Public Safety Training Facility Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction - - 5,000,000 - - 5,000,000 - - 5,000,000 - - 5,000,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees - - 5,000,000 - - 5,000,000 - - 5,000,000 - - 5,000,000 72 City of Hardeeville Capital Improvement Program Project # 23-020 Project Name City Dispatch Center Type: Replacement Department: Useful Life: 5 years Contact: Category: Building & Structures Priority: Location: Downtown Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other Establish a city dispatch center for Police and Fire/EMS In the coming years with the increase in population the need for a City Dispatch Center will become a necessity. $10,250,000 FY23 through FY27 Fire Steve Camp Public Safety Safety Proposed 73 Project # 23-020 Project Name City Dispatch Center Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants - - 250,000 - - 250,000 Construction - - - - 10,000,000 10,000,000 - - 250,000 - 10,000,000 10,250,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees - - - - - - Bond Financing - - - - 10,000,000 10,000,000 Transfer to CIP-General Fund - - 250,000 - - 250,000 - - 250,000 - 10,000,000 10,250,000 74 City of Hardeeville Capital Improvement Program Project # 23-021 Project Name Fire Station 84 Expansion Type: Improvement Department: Useful Life: 20 years Contact: Category: Building & Structures Priority: Location: Various Reason: Year Submitted: 2023 Status: Description Justification Budget Impact/Other Expand fire station 84. $3,000,000 FY23 through FY27 Fire Steve Camp Public Safety Safety Proposed 75 Project # 23-021 Project Name Fire Station 84 Expansion Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction - 3,500,000 - - - 3,500,000 - 3,500,000 - - - 3,500,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees - 3,500,000 - - - 3,500,000 - 3,500,000 - - - 3,500,000 76 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-022 Project Name City Building Access Control & Security Type: Improvement Department: Public Works/Police Department Useful Life: 20 Years Contact: Rhett Lott/Sam Woodward Category: Building & Structures Priority: Security/Planned Improvement Location: Multiple Year Submitted: FY22 Status: Active Description Access control and security upgrades to all City buildings. FY23 to include card access control for City Hall Justification Continue the access control program for City buildings to include card reader access control at all non-public exterior and interor doors with programmed access control for City employess utilizing printed RFID employee ID cards. Also includes security cameras at exterior doors and select interior doors. Budget Impact/Other 77 Project # 23-022 Project Name City Building Access Control & Security Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 75,000 75,000 75,000 75,000 - 300,000 75,000 75,000 75,000 75,000 - 300,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 75,000 75,000 75,000 75,000 - 300,000 75,000 75,000 75,000 75,000 - 300,000 78 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-023 Project Name Roadway Holiday Decorations Type: Replacement Department: Public Works Useful Life: 10 years Contact: Rhett Lott Category: Seasonal Priority: Planned Improvement Location: Downtown Year Submitted: FY22 Status: Active Description Continue replacement of Christmas decorations for US 17 and SC 46. FY21 purchased lighted decorations for US17 & SC46. FY22 Competed electrical connections for lighted decorations Justification In FY21 existing decorations were found to be in disrepair. This is the third year of a three year campiagn to Budget Impact/Other FY21: Lighted Holiday Decorations ordered for $67,534. (COMPLETE) FY22: Electrical Connections: $100,350. (COMPLETE) FY23: Order unlighted decorations for US 17, order banners and brackets, replace christmas tree: $121,670. 79 Project # 23-023 Project Name Roadway Holiday Decorations Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 121,670 - - - - 121,670 121,670 - - - - 121,670 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 121,670 - - - - 121,670 121,670 - - - - 121,670 80 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-024 Project Name Public Works Parking Paving Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Improvement Priority: Planned Improvement Location: Public Works Parking Lot Paving Year Submitted: FY22 Status: Proposed Description Asphalt paving of the Public Works Facility parking lot. Justification With the increased use of the facility due to housing the workforce training classes, additional parking is necessary. Paved and lined asphalt will provide more efficient parking and will allow for the necessary parking without expanding the parking area and will also be more appropriate for a City building. Budget Impact/Other Propesed funding for this project would be general fund transfer. 81 Project # 23-024 Project Name Public Works Parking Paving Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 25,000 - - - - 25,000 Construction 85,000 - - - - 85,000 110,000 - - - - 110,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 110,000 - - - - 110,000 110,000 - - - - 110,000 82 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-025 Project Name Stormwater Managment Division Type: Infrastructure Department: Public Works Useful Life: N/A Contact: Rhett Lott Category: Improvement Priority: Improve Service Location: Public Works Year Submitted: FY22 Status: Proposed Description Creation of a division of the Public Works Department for implementation of the City's NPDES permit (MS4) including estimated costs for staffing, equipment, vehicles, tools and supples. Justification With anticpated MS4 designation, the City will become responsible for discharges from all of the stormwater systems within the City. This will require planning, inspection, maintenance, sampling/testing, plan review, and constant update of the system inventory and condition assesment. Much of this will be contracted. However, this will require additional staffing, vehicles, and equipment for program reqirements that are not financially feasible to contract for. Budget Impact/Other 83 Project # 23-025 Project Name Stormwater Managment Division Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Staffing and Equipment - 250,000 200,000 150,000 - 600,000 - 250,000 200,000 150,000 - 600,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund - 250,000 200,000 150,000 - 600,000 - 250,000 200,000 150,000 - 600,000 84 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-026 Project Name Highway 17 Pump Station Upgrades Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Land Improvements Priority: Planned Improvement Location: Downtown Year Submitted: FY22 Status: Proposed Descript ion Replacement and upgrade to the stormwater pump station located at HWY 17 and Strain Place. Justification Existing pump station constructed in 1972 with an irrigation screw pump. Pump has undergone multiple repairs and is currently running at approximately 50% capacity. The intake basin was constructed partially across the adjacent property line and also does not allow for maintenance of the basin. Replacement consists of construction of a concrete intake structure and replacement of the irrigation pump with a submersible duplex pump station. Budget Impact/Other 85 Project # 23-026 Project Name Highway 17 Pump Station Upgrades Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 50,000 - - - - 50,000 Cons truction 300,000 300,000 - - 600,000 350,000 300,000 - - - 650,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 350,000 300,000 - - - 650,000 350,000 300,000 - - - 650,000 86 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-027 Project Name Presbyterian Church Property and Building Improvements Type: Improvement Department: Public Works Useful Life: N/A Contact: Rhett Lott Category: Land Improvements Priority: Planned Improvement Location: Downtown Year Submitted: FY22 Status: Proposed Description Improvement of the First Prebyterian Church Property and Building for City use; provided the City purchases the property. Justification Budget Impact/Other Land Acquisition funds could be used to fund this project. 87 Project # 23-027 Project Name Presbyterian Church Property and Building Improvements Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 75,000 - - - - 75,000 Construction 614,000 289,000 - - - 903,000 689,000 289,000 - - - 978,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Land Acquisition Funds 689,000 289,000 - - - 978,000 689,000 289,000 - - - 978,000 88 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-028 Project Name Public Works Facility Renovations Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Building & Structures Priority: Planned Improvement Location: Public Works Year Submitted: FY22 Status: Proposed Description Facility renovations to accommodate department growth, specifically Stormwater Division and Streets Maintenance Division. Justification Renovation of the 2nd bay in the bulding to add office space, locker rooms, larger restrooms, and open office for PW staff. Will also include secure storage areas for facility maintenance supplies. Budget Impact/Other 89 Project # 23-028 Project Name Public Works Facility Renovations Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 50,000 - - - 50,000 Construction 125,000 75,000 - - 200,000 175,000 75,000 - - - 250,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 175,000 75,000 - - 250,000 175,000 75,000 - - - 250,000 90 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-029 Project Name Street Maintenance Division Type: Infrastructure Department: Public Works Useful Life: N/A Contact: Rhett Lott Category: Growth Priority: Improve Service Location: Public Works Year Submitted: FY22 Status: Proposed Description Creation of a division of the Public Works Department for maintenance of City streets including asphalt and concrete repair, pavement striping, inspection, and development of City road and pavement standards. Includes estimated costs for staffing, vehicles, and equipment Justification The City has begun adding or assuming responsibility for new roads that will require maintenance including pothole and sidewalk repair. Major repairs or resurfacing will be contracted; however, it is not feasible or advantageous to contract regular maintenance or minor repairs. The Street Maintenance Division would consist of a crew of 3-5 workers with associated vehicle(s) and equipment necessary for the inspection, maintenance, and minor repairs of City maintained roads. Budget Impact/Other 91 Project # 23-029 Project Name Street Maintenance Division Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Staffing and Equipment - 250,000 250,000 250,000 - 750,000 - 250,000 250,000 250,000 - 750,000 Funding Sources FY22 FY23 FY24 FY25 FY27 TOTAL Transfer to CIP-General Fund - 250,000 250,000 250,000 - 750,000 - 250,000 250,000 250,000 - 750,000 92 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-030 Project Name Replace Compact Track Loader Type: Replacement Department: Public Works Useful Life: 10 years Contact: Rhett Lott Category: Machinery & Equipment Priority: Cost Avoidance Location: Public Works Year Submitted: FY22 Status: Proposed Description Replace 2010 Cat 257B compact track loader with new wheeled skid steer. Justification Current compact track loader was purchased approximately 10 years ago and is heavily utilized. Department staff has stated that a wheeled skid steer would work better for operations than the tracked machine; the skid steer is also less costly to purchase and maintain than the tracked loader. This is equipment that is used daily, therefore rental of a machine is not practical. Budget Impact/Other 93 Project # 23-030 Project Name Replace Compact Track Loader Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 75,000 - - - - 75,000 75,000 - - - - 75,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 75,000 - - - - 75,000 75,000 - - - - 75,000 94 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-031 Project Name Replace 4 Zero Turn Mowers Type: Replacement Department: Public Works Useful Life: 5 years Contact: Rhett Lott Category: Machinery & Equipment Priority: Planned Improvement Location: Various Year Submitted: FY22 Status: Proposed Description Replacement of 4 zero turn mowers; planned replacement of mowers on a 5 year cycle. Replacement of 2 mowers was requested in FY22 but was not funded. Justification Mowers utilized city wide for grass mowing. Typical lifespan for these is 5 years. This replacement would be for two mowers purchased approximately 6 years ago and 2 mowers purchased approximately 5 years ago. Several mowers are not currently operational and have been scavanged for parts to keep the other motors running. Budget Impact/Other 95 Project # 23-031 Project Name Replace 4 Zero Turn Mowers Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 65,576 16,395 16,395 16,395 16,395 131,156 65,576 16,395 16,395 16,395 16,395 131,156 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 65,576 16,395 16,395 16,395 16,395 131,156 65,576 16,395 16,395 16,395 16,395 131,156 96 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-032 Project Name Purchase of a 10' Rotary Mower Type: New Vehicles & Equipment Department: Public Works Useful Life: 10 years Contact: Rhett Lott Category: Machinery & Equipment Priority: Planned Improvement Location: Various Year Submitted: FY22 Status: Proposed Description Purchase of a 10' rotary mower for use with existing utility tractor. Justification Utility tractor with rotary mower utilized for right-of-way mowing and canal/pond access road maintenance. Current 15' batwing mower is too large for use in all areas, this would supplement use of the batwing. Budget Impact/Other 97 Project # 23-032 Project Name Purchase of a 10' Rotary Mower Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 11,000 - - - - 11,000 11,000 - - - - 11,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 11,000 - - - - 11,000 11,000 - - - - 11,000 98 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-033 Project Name Purchase of a Brush Cutter Attachment Type: New Vehicles & Equipment Department: Public Works Useful Life: 10 years Contact: Rhett Lott Category: Machinery & Equipment Priority: Planned Improvement Location: Various Year Submitted: FY22 Status: Proposed Description Purchase of a brush cutter attachment for the mini-excavator. Justification Will be utilized for canal and pond bank mantenance as well as maintaining miscellaneous areas that are innaccessable with current equipment. Budget Impact/Other 99 Project # 23-033 Project Name Purchase of a Brush Cutter Attachment Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 10,000 - - - - 10,000 10,000 - - - - 10,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 10,000 - - - - 10,000 10,000 - - - - 10,000 100 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-034 Project Name Recreation Complex Pump Station Type: Improvement Department: Public Works Useful Life: 5 years Contact: Rhett Lott Category: Equipment Priority: Planned Improvement Location: Richard Gray Complex Year Submitted: FY22 Status: Proposed Description Justification Budget Impact/Other Potential funding source - ARPA funds. Replace two existing grinder pumps with one duplex pump station. Existing grinder pumps are undersized for current use and planned growth. 101 Project # 23-034 Project Name Recreation Complex Pump Station Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 200,000 - - - - 200,000 200,000 - - - - 200,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Recreation DA Fees 200,000 - - - - 200,000 200,000 - - - - 200,000 102 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-035 Project Name Finance Department Renovations Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Building & Structures Priority: Planned Improvement Location: City Hall Year Submitted: FY23 Status: Proposed Description Construction of two closed offices in Finance Department Justification Finance Staff are required to complete tasks requiring significant attention to detail. Closing in the Accountant and AP Clerk workspaces will enable them to be more effective and produce work more efficiently by reducing distractions. Budget Impact/Other $18,000 to change the Finance suite layout and provide enclosed workspace for two staff members. 103 Project # 23-035 Project Name Finance Department Renovations Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 18,000 - - - 18,000 18,000 - - - - 18,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 18,000 - - - 18,000 18,000 - - - - 18,000 104 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-036 Project Name Purchase of a Backhoe Type: New Vehicles & Equipment Department: Public Works Useful Life: 15 years Contact: Rhett Lott Category: Machinery & Equipment Priority: Planned Improvement Location: Various Year Submitted: FY23 Status: Proposed Description Purchase of a backhoe Justification Backhoe will be utilized for stormwater system maintence, small improvement projects identified in the Comprehensive Stormwater Master Plan and asphalt pavement repair. Equipment will be utilized by the Stormwater Management Division and Streets Division. Backhoe wouuld also utilized in emergency and disaster recovery operations. Budget Impact/Other 105 Project # 23-036 Project Name Purchase of a Backhoe Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 180,000 - - - - 180,000 180,000 - - - - 180,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 180,000 - - - - 180,000 180,000 - - - - 180,000 106 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-037 Project Name Purchase of a Vacuum Truck Type: New Vehicles & Equipment Department: Public Works Useful Life: 15 years Contact: Rhett Lott Category: Machinery & Equipment Priority: Planned Improvement Location: Various Year Submitted: FY23 Status: Proposed Description Purchase of a vacuum truck Justification Vacuum truck will be utilized for stormwater system maintence, small improvement projects identified in the Comprehensive Stormwater Master Plan an will be utilized by the Stormwater Management division. Budget Impact/Other 107 Project # 23-037 Project Name Purchase of a Vacuum Truck Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase 425,000 - - - - 425,000 425,000 - - - - 425,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 425,000 - - - - 425,000 425,000 - - - - 425,000 108 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-038 Project Name US 278 - Lattitude/Lakeside Turn Lanes Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Improvement Priority: Planned Improvement Location: US 278 & Lattitude/Lakeside Intersection Year Submitted: FY23 Status: Proposed Description Improvement to turn lanes at Margaritaville & Hilton Head Lakes intersection Justification With the installation of the new traffic signal, there is a potential for the stacking of left turn traffic into the travel lanes of US 278. Improvement of the left hand turn lanes is proposed to increase the number of cars that can be stacked in the turn lanes Budget Impact/Other 109 Project # 23-038 Project Name US 278 - Lattitude/Lakeside Turn Lanes Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 74,500 - - - - 74,500 Construction 850,000 - - - - 850,000 924,500 - - - - 924,500 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 924,500 - - - - 924,500 924,500 - - - - 924,500 110 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-039 Project Name Fire Station 81 HVAC Modifications Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Improvement Priority: Planned Improvement Location: Fire Station 81 Year Submitted: FY23 Status: Proposed Description Modifications to the HVAC system at FS81 to improve temperature and humidity control Justification Fire Station 81 was designed to accommodate a staff of approximatly 15 personell; the HVAC system as designed cannot effectively control the temperature and humidity with the current staff of 4. These modifications will allow control of the system with the current staffing and also allow for software manipulation of the system as the staffing increases. Budget Impact/Other 111 Project # 23-039 Project Name Fire Station 81 HVAC Modifications Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 42,800 - - - - 42,800 42,800 - - - - 42,800 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund Transfer 42,800 - - - - 42,800 42,800 - - - - 42,800 112 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-040 Project Name Media Studio Space Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Building & Structures Priority: Planned Improvement Location: City Hall Year Submitted: FY23 Status: Proposed Description Construction of studio space for the Media Department in current location of departmement staff; staff will relocated to center section of Old Town Hall once vacated by Jasper County Auditor and Treasurer Justification Previous location of studio was removed with re-location of Fire Department HQ and EOC, a temporary studio was setup in the Dasher House, but that location and space was deemed to be unsatisfactory. Budget Impact/Other Project will be funded using General Funds. 113 Project # 23-040 Project Name Media Studio Space Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 50,000 - - - 50,000 50,000 - - - - 50,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 50,000 - - - 50,000 50,000 - - - - 50,000 114 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-041 Project Name Boyd Street Sidewalk Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Improvement Priority: Planned Improvement Location: Boyd Street Year Submitted: FY23 Status: Proposed Description Construction of a new sidewalk along Boyd Street to connect existing sidewalk on Boyd Street and on Martin Street. Justification Provide safe pedestrian travel from Boyd Street and Ulmer Street to Main Street. Budget Impact/Other 115 Project # 23-041 Project Name Boyd Street Sidewalk Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 300,000 - - - 300,000 300,000 - - - - 300,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer from General Fund 300,000 - - - 300,000 300,000 - - - - 300,000 116 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-042 Project Name RG Park Complex Overview JuJu, Parking, Pump Station and RG MP improvements Project Type: Improvement Department: PRT Useful Life: 20 Years Contact: Combs Category: Construction/Improvements Priority: High Location: Richard Gray Recreation Complex Park Reason: Safety Year Submitted: FY21 Status: Active Description Justification Budget Impact/Other The Ricahrd Gray Recreation Complex is the only community park in Hardeeville. A master plan was adopted in 2019 that focuses on improvements to the park and grounds. Projects include:several smaller projects (JuJu Hutson, pump station, parking additons and resurfacing, and traffic calming). Since the master was approved, the Department has made several improvements including a Dog Park and street parking, new fencing around both the turf field and the old dog park entrance. Additionally,a new playground (Phase 1 of JuJu Hutson Masterplan), two covered shelters over the exisiting basketball courts, and basketball court resurfacing have been completed. Two new grinder pumps at the football and baseball fields were also added. The Richard Gray Recreation Complex is the only community park in Hardeeville. The park will not be able to meet the growing demands for recreational facilities. To meet the growing demands, the park will need to be upgraded. Once the playground (JuJu Hutson Phase 1) was completed, safety is priorty to get the area fenced in with sidewalks and landscaping as well as continued planed improvements to inlcude construction of shelter, fencing, shade and seating components, defined entrances and onstreet parking, Phase 2 park construction is set to begin in 2022 as well as parts of Phase 3 (parking). Grinder pumps were added in FY22 and will sustain growth through 2025-2026 before a pump station can be added. ARPA Funds could be used for pump station, construction of park approved usinig ARPA $635K 117 Project # 23-042 Project Name RG Park Complex Overview Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL JuJu Phase 2 & 3 1,569,000 - 750,000 210,000 376,000 2,905,000 RG Master Plan Improvements 215,000 1,840,000 2,320,500 4,810,000 6,084,000 15,269,500 Trails Grant 550,000 - - - - 550,000 Traffic Calming RG Complex - 30,000 - - - 30,000 RG Complex Parking 150,000 834,000 - - - 984,000 2,484,000 2,704,000 3,070,500 5,020,000 6,460,000 19,738,500 Funding Sources FY23 FY24 FY25 FY25 FY27 TOTAL JuJu Phase 2 & 3 1,569,000 - 750,000 210,000 376,000 2,905,000 RG Master Plan Improvements 215,000 1,840,000 2,320,500 4,810,000 6,084,000 15,269,500 Trails Grant 550,000 - - - - 550,000 Traffic Calming RG Complex - 30,000 - - - 30,000 RG Complex Parking 150,000 834,000 - - - 984,000 2,484,000 2, 704,000 3,070,500 5,020,000 6,460,000 19,738,500 118 FY23 through FY27 Project # 23-042 Project Name JuJu Hutson Phase 2 & 3 Project Type: Improvement Department: PRT Useful Life: 20 Years Contact: Lott/Combs Category: Construction Priority: High Location: Richard Gray Recreation Complex Park Reason: Safety Year Submitted: FY21 Status: Active Description Justification Budget Impact/Other Budget impact is projected at $562,000 (FY 21/22) phase 2 (includes $55k in FY21, moving $330 to FY22 and adding $278K to FY22. Funding sources available might be GF, DA fees, State/Local Accomodations Tax, grants where applicable to fund this project. NOTE: $385K was earmarked and approved for spending through DA fees in the FY21 budget. Due to COVID and delay of the projects in the park, we have pushed all but $55K (alliance engineering to come out this FY21). Remaining balance will need to be pushed to FY22 $330,000-also adjusted for drainiange, irrigation,site work JuJu Hutson is a phased approved Master Plan (adopted in 2018 by CC) that provides quality of life enhancements to the citizens through recreational facilities and amenities. Planned upgrades are playground (competed in 2020), landscaping (Phase 2), fencing (phase 2), sidewalk (phase 2) defined gateway entrance to play area (phase 2), shelter (phase 2), on street parking, ADA parking, bathrooms (phase 3), will need to add sub station capable of handling all current and future needs (phase 3), additional parking across from the playground (Phase 3) parking is only a place holder for project. Quality of life; Richard Gray Recreation Complex Park has a Master Plan adopted by CC in 2019 that addresses the rising need to provide recreational amenities that enhance the existing park. The JuJu Hutson Playground Master Plan adopted by CC in 2018 is a place holder in the Richard Gray Master Plan. Once playground (Phase 1) was completed, safety is priorty to get the area fenced in with sidewalks and landscaping as well as continued planed improvements to inlcude construction of shelter, f i h d d i d fi d d ki 119 Project # 23-042 Project Name JuJu Hutson Phase 2 & 3 Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning, Consultants, Engineering 50,000 - 50,000 10,000 - 110,000 Construction 1,519,000 - 350,000 200,000 376,000 2,445,000 Grants - - 350,000 - - 350,000 1,569,000 - 750,000 210,000 376,000 2,905,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/Bond 50,000 - - 10,000 - 60,000 DA Fees 884,000 - 50,000 - 280,000 1,214,000 Accomodations (State/local) - - 350,000 - 96,000 446,000 Grants/ARP funds 635,000 - 350,000 200,000 - 1,185,000 1,569,000 - 750,000 210,000 376,000 2,905,000 FY23 through FY27 Project # 23-042 Project Name Richard Gray Recreation Complex MP improvements Type: New Department: PRT Useful Life: 15 years Contact: Combs Category: Hardware & Software Priority: High Location: RG Complex (RecPlex) Reason: Growth/Safety Year Submitted: 2021 Status: Active Description Richard Gray Master Plan is a 9-15 million dollar improvement plan that City Council adopted in 2019. The plane aimsto improve existing amenities within the complex as well as adding new features that will provide services and amenities for the growing population of the City. Improvements include street lighting, street scaping, trails, new fields, road resurfacing, new parking, parking improvements, gateway entrances, fencing, shelters and more. Justification As the City continues to grow, the Park be expanded. 120 Budget Impact/Other Based on the approved master plan provided by consultants, budget impact for improvements is estimated to be $15 million depending on implementation schedules with possible funding from genral funds, DA fees, accomodations taxes, and grants. Plans include a new parking lot by the basketball court and dog park as well as gateway entry signage. Note: 5 year budget is broken out for project completion; it will expand over a 10 year period. Project # 23-042 Project Name Richard Gray Recreation Complex MP improvements Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning, Consulting, Engineeri 65,000 40,000 20,000 10,000 84,000 219,000 Construction 150,000 1,800,000 2,300,500 4,800,000 6,000,000 15,050,500 215,000 1,840,000 2,320,500 4,810,000 6,084,000 15,269,500 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/Bond 65,000 1,840,000 2,295,500 4,800,000 6,000,000 15,000,500 DA Fees 150,000 150,000 Accomodations (State/local) 25,000 10,000 84,000 119,000 Grants 0 215,000 1,840,000 2,320,500 4,810,000 6,084,000 15,269,500 121 FY23 through FY27 Project # 23-042 Project Name Trails Grant Project Type: Trail Development Department: PRT Useful Life: 10 years Contact: Jennifer Combs Category: Trail Construction Priority: Immediate Location: Richard C Gray Sports Complex Year Submitted: FY21 Status: Proposed Description Justification Budget Impact/Other The estimated project total is $500,000 and the City received $100,000 through the Recreational Trails Program with $50,000 match. The project will be completed over the next two years and paid for through a partnership between the City and a new developer. The developer has purchased land adjacent to the proposed trail system and Royal Live Oaks Academy. The developer will be constructing workforce and attainable housing that complements the vision of City Administration in revitalizing the downtown area. The trail system will be a community asset that directly impacts the school, the new housing community and City facilities while improving the quality of life for all City residents and visitors alike. Phase I of the trail project establishes a looping trailhead in conjunction with the Richard Gray Sports complex and the future Ju Ju Hutson Park. This initial section of the trail will be approximately 2,650 linear ft. and 8ft. in width with an ADA accessible compact aggregate base. The project will help to improve the mobility and safety/security for pedestrians and bicyclists to better enjoy the various components of the City. The City Loop Trail, once complete, will be a shared use path winding its way through pristine nature areas consisting of water views, woodlands and marshland areas while allowing enjoyable opportunities for walking, biking and picnicking. The success of the project will help improve the quality of life for the residents and visitors of the City and begin working towards a future connection with the East Coast Greenway. 122 Project # 23-042 Project Name Trails Grant Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 500,000 - - - 500,000 planing, permitting, engineering 50,000 - - - 50,000 550,000 - - - - 550,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Recreational Trails Grant 500,000 - - - 500,000 DA Fees/ARPA funds 50,000 - - - 50,000 550,000 - - - 550,000 123 FY23 through FY27 Project # 23-042 Project Name Traffic Calming, Richard Gray Complex Type: Improvement Department: Public Works Useful Life: 30 years Contact: Rhett Lott Category: Land Improvements Priority: Planned Improvement Location: Richard Gray Complex Year Submitted: FY22 Status: Proposed Description Installation of traffic calming measures at the Richard Gray Sports complex including speed humps, bollards/fencing, and signage Justification Measures to reduce the speed of traffic in the Richard Gray complex. Budget Impact/Other 124 Project # 23-042 Project Name Traffic Calming, Richard Gray Complex Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Purchase and Installation 30,000 - - - - 30,000 30,000 - - - - 30,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Recreation DA Fees/ Atax 30,000 - - - - 30,000 30,000 - - - - 30,000 125 FY23 through FY27 Project # 23-042 Project Name Richard Gray Complex Parking Type: Improvement Department: Public Works Useful Life: Contact: Jennifer Combs Category: Land Improvement Priority: Planned Improvement Location: Richard Gray Complex Year Submitted: FY22 Status: Proposed Description Justification Budget Impact/Other Resurfacing and re-striping of the existing asphalt parking lot at the Richard Gray Sports Complex and construction of new parking areas adjacent to the basketball courts per the masterplan. Proposed to be funded by DA fees; design and permitting FY21 as part of the JuJu Hutson project. Included in the current masterplan for the Richard Gray complex. 126 Project # 23-042 Project Name Richard Gray Complex Parking Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 55,000 - - - - 55,000 Construction 95,000 834,000 - - - 929,000 150,000 834,000 - - - 984,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 150,000 834,000 - - - 984,000 150,000 834,000 - - - 984,000 127 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-043 Project Name Alta Bike Pedestrain Trails Master Plan Community Trail City Loop Trail Type: New Department: PRT Useful Life: 20 years Contact: Combs Category: Construction (Trails) Priority: Improve Service Location: City Wide Reason: Connectivity Year Submitted: 2021 Status: Active Description Seeing the future planned growth for the City, City Council requested a bid package be realsed for consultation which resulted in the 2017 Alta plan being adopted by CC. The Master plan encompasses 5 main trails that provide recreational opportunities and connectivity enhancing the quality of life. Justification As the City grows, connectivity is needed. With the construction of the recreation Center and a planned development community adject to the City's property the City is moving ahead with it's first planned trail. Budget Impact/Other Based on the approved City Wide Bike and Pedestrain Trails Master Plan adopted by CC (2017) provided by consultants, the budget impact for the project (City Loop/RG Connection Trail) of this section of the MP is $680,000 with funding to come from a variety of funding sources including grants, general funds, DA fees, local atax (accomodations and hosptitality) Speaks to 3 projects within the Alta Plan; excludes Downtown sidepath (Whyte Hardee) and Sgt Jasper Loop trail. 128 Project # 23-043 Project Name Alta Bike Pedestrain Trails Master Plan Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning, Consulting, Engineering 45,000 15,000 46,000 - - 106,000 Construction 635,000 2,300,000 350,000 750,000 680,000 4,715,000 680,000 2,315,000 396,000 750,000 680,000 4,821,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/Bond 50,000 2,315,000 396,000 750,000 680,000 4,191,000 DA Fees 455,000 - - - - 455,000 Accomodations (State & Local) 25,000 - - - - 25,000 Grants 150,000 - - - - 150,000 680,000 2,315,000 396,000 750,000 680,000 4,821,000 129 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-044 Project Name Millstone Landing Type: Improvement Department: Planning Useful Life: 20 Contact: Lott/Combs Category: Construction Priority: Planned Improvement Location: Millstone landing Reason: Safety/Security Year Submitted: 2023 Status: Active Description Realizing that Hardeeville is a growing municipality and that growth has largely eluded Millstone Landing, a need is viable to maintain safety, safety, security and quality of life improvements. Millstone Landing is a very popular landing providing access to the Savannah River. It will be a major park amenitty once Exit 3 is developed. Justification The project seeks to provide safety and security enhancements for residents and visitors alike. Budget Impact/Other Based on the exisitng conditons and rising need to address security and aging amenities, budget impact for FY22 project is $248,000 with a variety of funding sources, including General Fund, Accomodations, DA Fees and Grants where applicable. Proposal is to develop a Master Plan in FY26 in anticipation of Marine Rescue Squad Building lease expiring in 2028. 130 Project # 23-044 Project Name Millstone Landing Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning, Consultants, Engineerin 5,000 - 8,000 - 65,000 78,000 Construction 60,000 - 240,000 - 2,870,000 3,170,000 65,000 - 248,000 - 2,935,000 3,248,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/Bond 5,000 - 178,000 - 2,935,000 3,118,000 DA Fees - - 10,000 - - 10,000 Accomodations (State/local) - - 50,000 - - 50,000 Grants/ARP 60,000 - 10,000 - - 70,000 65,000 - 248,000 - 2,935,000 3,248,000 131 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-045 Project Name East Argent 1330 Conservation Easement Type: New Department: PRT Useful Life: 15 years Contact: Lott/Combs Category: Construction Priority: Planned Improvement Location: East Argent Reason: Increased need Year Submitted: 2024 Status: Future Description EA 1330 was gifted to the City in 2019; legally turned over in 2020. Realizing that Hardeeville is a growing municipality in the East Argent section of the City and natural protected open areas are dwiendling, this conservation easement was a welcome opportunity to protect and preserve Lowcountry natural resources while providing a new outdoor recreational options for bike and pedestrian trails. Justification As the East Argent corridor expands, recreational needs continue to increase. This large 1330 acre natural resource will provide Hardeevill a protected natural resource with several outdoor recreational opportunities. Budget Impact/Other Possible funding sources would be general funds, DA fees, Federal and local grants, Accomodations. Expected total project impact $3,000,000. Infrasturcture is needed before City can develop this property. There is currently no access and developers estimate it could be FY24 before access is available. 132 Project # 23-045 Project Name East Argent 1330 Conservation Easement Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning, Consultants & Engineering 50,000 65,000 - - - 115,000 Construction - - 1,000,000 950,000 900,000 2,850,000 50,000 65,000 1,000,000 950,000 900,000 2,965,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 50,000 65,000 1,000,000 950,000 900,000 2,965,000 50,000 65,000 1,000,000 950,000 900,000 2,965,000 133 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-046 Project Name East Argent Rec Plex Type: New Department: PRT Useful Life: 20-25 years Contact: Combs Category: Construction Priority: Location: East Argent Reason: Year Submitted: 2021 Status: Inactive Description The East Argent development gifted to the City 81 acres for recreational facilites. Realizing that Hardeeville is a growing municipality in the East Argent section of the City the current amenities will be adequate not provide for the influx of residents to the area. Current RG Complex park is already at capacity and will not be able to sustain additional usage. This property will be developed in manner similar to that of the Richard Gray Complex. Justification As the East Argent corridor grows, recreational requirements will increase. This 81 acre parcel will allow the PRT department to expand services to provide amenities such as soccer fields, practice fields, an outdoor concert venue, and softball and baseball fields. Budget Impact/Other including General General Fund, DA fees, State and Local Accomodations Tax, and Grants could be used to fund this project. Citizens would have more park amenties to fullfill a better quality of life with the completion of this project. Budget impact is projected between $7-10 million completely built out including engineering and consulting fees. Various funding sources 134 Project # 23-046 Project Name East Argent Rec Plex Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning, Consultants, Engineering - - 65,000 - - 65,000 Construction - - - 2,500,000 4,900,000 7,400,000 - - 65,000 2,500,000 4,900,000 7,465,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/ Bond - - - 2,500,000 4,900,000 7,400,000 DA Fees - - 65,000 - - 65,000 - - 65,000 2,500,000 4,900,000 7,465,000 135 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-047 Project Name Recreation Center Type: New Department: PRT Useful Life: Contact: Combs Category: Equipment Priority: Location: Rec Cneter Reason: Year Submitted: 2022 Status: Description Due to lack of contingency or interior supply budget at the initial onset of the contractual process, the Rec Center build project was not able to add some items in the initial build. A/V $150,000; turnstiles front desk lobby $70,000; sound proofing/enginerreing and plan implementatoin $150,000 to $225,000 based on returns. Only 120K was approved and covers $50K A/V and turnstiles (we replaced turnstiles with signage) Justification These items will help enhance the space and allow for a multi-use function for rentals, tournaments, conferences, retreats and events. Budget Impact/Other Budget impact is expected to be approximately $315,000. 136 Project # 23-044 Project Name Recreation Center Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Turnstiles 90,000 5,000 - - - 95,000 Public Address & Sound Proofing - 120,000 100,000 - - 220,000 90,000 125,000 100,000 - - 315,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund/Bond - 125,000 70,000 - - 195,000 DA Fees/ ARPA funding 90,000 - 10,000 - - 100,000 Accomodations (State/local) - - 20,000 - - 20,000 90,000 125,000 100,000 - - 315,000 137 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-048 Project Name Rec Center Drive and Parking Type: Improvement Department: Public Works/Recreation Useful Life: 30 years Contact: Rhett Lott/Jennifer Combs Category: Land Improvements Priority: Planned Improvement Location: Indoor Recreation Center Year Submitted: FY22 Status: Proposed Description Complete rear drive to McTeer Street and rear parking area at Rec Center. Justification Requested for FY21 CIP, moved to FY22 CIP. Drive and parking area paving were removed from project due to increased cost for site work during the design phase of the project, earthwork was not removed. Planned completion immediately after the rest of the project is complete. Budget Impact/Other 138 Project # 23-048 Project Name Rec Center Drive and Parking Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 175,000 - - - - 175,000 175,000 - - - - 175,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL DA Fees 175,000 - - - - 175,000 175,000 - - - - 175,000 139 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-049 Project Name PRT Department Comprehensive Master Plan Type: NEW Department: PRT Useful Life: 15 years Contact: Combs Category: Design/Development Priority: HIGH Location: City Wide Reason plan for the future Year Submitted: 2023 Status: Description The City of Hardeeville is the fastest growing City in SC and such has growing recreational needs to meet the growing demands of the City throughout its borders, having a comprehensive plan put into place will allow the department to plan strategically while assessing the recreational needs and future impacts for parks and trails, amenities, open space and more. The comprehensive plan can also be a critical tool in how we deal with new development and impact fees for these services and amenities. Justification A comprehensive MP is needed to assess current and future needs of the community. Plans help establish long range vision, prioritize and budget for CIP and also helps build community support, new ideas, and strong partnerships. As we work with developers who are required to provide open spaces, having a plan in place can help shape how we provide serivces and ameniteis as we grow. Budget Impact/Other General Fund or DA fees could fund this initiave. 140 Project # 23-049 Project Name PRT Department Comprehensive Master Plan Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Planning & Consultants 60,000 60,000 - - - 120,000 60,000 60,000 - - - 120,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund 30,000 30,000 - - - 60,000 DA Fees 30,000 30,000 - - - 60,000 60,000 60,000 - - - 120,000 141 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-050 Project Name Whyte Hardee Boulevard Master Plan Type: Improvement Department: Planning Useful Life: 30 Years Contact: Snowden Category: Construction Priority: Planned Improvement Location: Downtown Hardeeville Year Submitted: FY21 Status: Active Description To implement a strategy for the long-term revitalization of Whyte Hardee Blvd. with a focus on creating a true downtown. Justification To seek a balance between different modes of transportation along the corridor, consider existing and future through-traffic and support the City's vision of walkability and economic develop. Budget Impact/Other Based on the Master Plan provided by consultants, the budget impact for the overall project is roughly $10 million with funding to come from a variety of sources, including SCDOT, Jasper County, grants, impact fees and General Funds. 142 Project # 23-050 Project Name Whyte Hardee Boulevard Master Plan Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction of Sidewalk/ Streetscape 321 to Garr 552,800 - - - - 552,800 Exit 5 to 321 - 663,070 - - - 663,070 Garr to Best - - 319,000 - - 319,000 Exit 5 I95 Bridge - - - 301,350 - 301,350 Main Street - - - - 326,300 326,300 552,800 663,070 319,000 301,350 326,300 2,162,520 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL SCDOT 250,000 100,000 100,000 100,000 100,000 650,000 Public - Private Partnerships 50,000 50,000 50,000 50,000 50,000 250,000 Transfer to CIP-General Fund 152,800 - - 151,350 176,300 480,450 Grants 100,000 513,070 169,000 - - 782,070 552,800 663,070 319,000 301,350 326,300 2,162,520 143 City of Hardeeville Capital Improvement Program Project # 23-051 Project Name AV Equipment Update-Council Chambers Type: AVTV Equipment Department: Useful Life: 5 years Contact: Category: Machinery & Equipment Priority: Location: City Hall Year Submitted: FY23 Status: Description Justification Budget Impact/Other Replace and upgrade cameras in council chambers along with adding a bi-switch monitor on the opposite wall of the current drop down screen. This is a follow-up to last year's upgrades Last year council agreed to make imporvements to the AV system in Council Chambers. Those improvements were imperative as the out of date with technology was not meeting the City's needs.. The current cameras need to be replaced. We recently had to purchase a new power pack which caused a camera to be out of service for several weeks. Additionally, the video is not as sharp as they need to be. The final piece of equipmenet is a bi-switch monitor that will be placed on a swing arm across from the current screen. Use of the bi-switch allows the City to show what is being presented on the screen and what is being shown on the stream. FY27 CIP request anticipates replacement of equipment purchased in FY23. Anticipated useful life is five years. FY23 through FY27 Media Juan Singleton Improve Service Proposed 144 Project # 23-051 Project Name AV Equipment Update-Council Chambers Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Hardware 40,000 - - - 55,000 95,000 40,000 - - - 55,000 95,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund 40,000 - - - 55,000 95,000 40,000 - - - 55,000 95,000 145 City of Hardeeville Capital Improvement Program Project # 23-052 Project Name Media Studio Space Furnishing Type: Furnishings and equipment Department: Useful Life: 5 years Contact: Category: Furniture and Equipment Priority: Location: 30 Main Street/ Studio Year Submitted: FY23 Status: Description Justification Budget Impact/Other This will be used to furnish and equip the new space for the media department. This will include set design furniture, equipment and general office furnishings. We are looking at having a two-set design. The first set will feature a round table design that will be used to continue the show, "Speaking of Hardeeville". This will consist of three chairs, a table a black back dropand semi permanenent and studio lighting. The second studio will be more flexible where we can make quick changes to have a set up that looks like a late night talk show, news desk or open for just taking a head shot. The items that are needed are guest chairs, sofa, studio lighting, backdrops, set desk,refrigerator and small appliances. FY23 through FY27 Media Juan Singleton Improve Service Proposed 146 Project # 23-052 Project Name Media Studio Space Furnishing Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Furniture & Equipment 20,000 - - - - 20,000 20,000 - - - - 20,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL General Fund 20,000 - - - - 20,000 20,000 - - - - 20,000 147 City of Hardeeville Capital Improvement Program FY23 through FY27 Project # 23-053 Project Name Inter Connect All City Facilities via Fiber Type: Improvement Department: Information Technology Useful Life: 20 Years Contact: James Kimbrell Category: Network Infrastructure Priority: Security/Planned Improvement Location: Multiple Year Submitted: FY22 Status: Proposed Description Connect all City Facilities (minus Remote Fire Stations) with Dark Fiber. 30 Martin to City Hall to Public Works. City Hall to Rec Center Justification Enhance Conectivity with less latency and increased stability to provide a more efficient and reliable services to the City. This will also allow us to reduce multiple circuits at the remote locations and allow for the phone system to communicate more efficiently on the same network. Budget Impact/Other Reduction in circuit costs of $12,000 per year 148 Project # 23-053 Project Name Inter Connect All City Facilities via Fiber Expenditures FY23 FY24 FY25 FY26 FY27 TOTAL Construction 90,000 90,000 - - - 180,000 90,000 90,000 - - - 180,000 Funding Sources FY23 FY24 FY25 FY26 FY27 TOTAL Transfer to CIP-General Fund 90,000 90,000 - - - 180,000 90,000 90,000 - - - 180,000 149 City of Hardeeville Capital Improvement Program FY22 through FY26 Project # 23-054 Project Name Fleet Management Type: Replacement Department: Public Works Useful Life: 5 years/ Rolling Contact: Rhett Lott Category: Automobiles and Trucks Priority: Cost Avoidance Location: Various Departments Year Submitted: FY22 Status: Proposed Descript ion Fleet replacment plan for City fleet vehicles with leased vehicles. Replacement plan and lease pricing by Enterprise Fleet under Sourcewell Cooperative Purchasing contract (vehicle pricing no higher than SC state purchasing contract). Does not include heavy vehicles or equipment; includes complete upfit for PD vehicles. Justification Fleet replacement and maintenance program by Enterprise Fleet; projected to save between $750,000 and $1,000,000 over a ten year period due to reduced maintenance cost and increased revenue from vehicle sale at end of lease term. Budget Impact/Other Initial plan included only replacement of current fleet; however new vehicles could also be included in lease program and will be included in the replacement plan beginning FY27. FY23 includes $27,396 due to the proposed hiring of three new patrol officers. 150 Project # 23-054 Project Name Fleet Management Expenditures FY22 FY23 FY24 FY25 FY26 FY27 TOTAL Vehicle Lease YR1 FY22 53,796 189,236 189,236 189,236 189,236 189,236 810, 740 Vehicle Lease YR2 FY23 - 27,396 - - - - 27,396 Vehicle Lease YR3 FY24 - - 118,654 52,349 52,349 52,349 275,701 Vehicle Lease YR4 FY25 - - - 209,436 124,065 124,065 457,566 Vehicle Lease YR5 FY26 - - - - 197,262 197,262 394,524 53,796 216,632 307,890 451,021 562,912 562,912 1,965,927 Funding Sources FY22 FY23 FY24 FY25 FY26 FY27 TOTAL Lease/ General Fund 53,796 216,632 307,890 451,021 562,912 562,912 1,592,251 53,796 216,632 307,890 451,021 562,912 562,912 1,592,251 151 APPENDIX G lossary of Terms The Annual Budget contains specialized and technical terminology that is unique to public finance and budgeting. To assist the reader in understanding these terms, a budget glossary of terms has been included. Accrued PTO - City employees accumulate paid time off (PTO). The City records a liability for this accumulation and commits a portion of fund balance to provide for potential payouts. American Rescue Plan Act (ARPA) (ARP) – Signed into law on March 11, 2021, The American Rescue P lan Act of 2021 provides $350 billion in additional funding for state and local governments. Assessed Value - The estimated value placed on real and personal property by the County’s Assessor used the basis for levying property taxes. Balanced Budget - A budget in which revenues fully cover expenditures. Appropriations may be made from prior year fund balance provided favorable reserves are maintained. Bond - A form of borrowing which reflects a written promise to pay a specified sum of money, called the face value or principal amount, at a specific date or dates in the future, called the maturity date(s), together with periodic interest at a specific rate. Budget - A comprehensive financial plan of operation which incorporates an estimate of proposed expenditures for a given period and the proposed means of financing them. Budget Stabilization Funds - Funds available for expenditure should an unbudgeted event (such as a hurricane) occur. Often referred to as rainy day funds. Capital Expenditures - The City considers items which cost more than $5,000 and have a useful life of greater than one year to be capital assets. Capital Improvement Plan (CIP) - A plan of capital improvement expenditures to be incurred each year over a period of the project’s life, setting forth each capital project, the amount to be expended and the proposed method of funding the project. Debt Limit - The maximum amount of general obligated debt which is legally permitted. The State of South Carolina forbids cities from incurring debt more than 8% of the total assessed valuation of taxable property within the City. Debt Service - The payment of principal and interest on borrowed funds, such as bonds. Department - An organizational unit of the City which manages an operation or group of related operations within a functional area. Development Agreement - a voluntary contract between a local jurisdiction and the entity that owns or controls property within the jurisdiction, detailing the obligations of both parties and specifying the standards and conditions that will govern development of the property. 152 Fiscal Y ear (FY) - A 12-month period to which the annual operating budget applies and at the end of which a government determines its financial position and the results of its operations. The City of Hardeeville’s fiscal year begins July first and ends the following June thirtieth. Full-Time Equivalent (FTE) - A position which works a 40-hour week on an ongoing basis and is specifically authorized for ongoing funding by classification in the annual budget. Two part -time positions equal one FTE. Most Public Safety (Fire and Police) employees work in shifts. The normal Fire employee shift is 10 4 work hours during a two- week period, while a normal Police employee shift is 84 work hours during a two-week period. Fund - A fiscal and accounting entity that has self -balancing set of accounts recording cash and other financial resources, together with all related liabilities and residual equities or balances, and changes therein, which are segregated for the purpose of carrying on specific activities or attaining certain objectives in accordance with special regulations, restrictions, or limitations. Fund Balance - The difference between governmental fund assets and liabilities. Fund Balance is intended to serve as a measure of the current financial resources available in a governmental fund. Generally Accepted Accounting Principles (GAAP) - a collection of commonly followed accounting rules and standards for financial reporting. General Fund - The fund used to account for all financial resources except those required to be accounted for in another fund. This is considered the City’s chief operating fund. General Obligation (G.O.) Bonds - When the City pledges its full-faith and credit to the repayment of the bonds it issues, then those bonds are General Obligation (G.O.) bonds. These bonds are usually repaid from taxes relating to debt. Governmental Accounting Standards Board (GASB) - A private non-governmental organization that creates accounting reporting standards, or Generally Accepted Accounting Principles (GAAP), for state and local governments in the United States. Governmental Funds - Funds generally used to account for tax-supported activities that rely mostly on current assets and current liabilities. There are five difference types of governmental funds: General, Special Revenue, Debt Service, Capital Projects, and Permanent Funds. Intergovernmental Revenue - Revenue received from other governments, whether local, state, or federal, usually in the form of grants, shared revenues, or payments in lieu of taxes. Mill - A tax rate based on the valuation of property. A tax rate of one mill produces one dollar of taxes on each $1,000 of property valuation. Modified Accrual Accounting - A basis of a ccounting in which expenditures are accrued, but revenues are accounted for on a cash basis. This accounting technique is a combination of cash and accrual accounting since expenditures are immediately incurred as a liability, while revenues are not recorded until they are received or are “measurable and available.” It is recommended as the standard for most governmental funds. 153 Operat ing Budget - A financial plan for the City’s general operations, such as salaries, contract services, utilities, and supplies. Performance Indicators - Statistical information which denotes the demands for services with a department. Property Tax - Property taxes are levied on both real and personal property according to the property’s assessed valuation and the tax rate applied. Special Revenue Fund - A fund used to account for and report the proceeds of specific revenue sources that are restricted or committed to expenditure for specific purposes other than debt service or capital projects. 154 Glossar y of Acronyms ACFR: Annual Comprehensive Financial Report (Formerly Comprehensive Annual Financial Report) AICPA: American Institute of Certified Public Accountants ARPA / ARP: American Rescue Plan Act ATAX: Accommodations Tax CIP: Capital Improvements Plan COLA: Cost of Living Adjustment CPI: Consumer Price Index DA: Developer Agreement FTE: Full-Time Equivalent FY: Fiscal Year GAAP: General Accepted Accounting Principles GAAFR: Governmental Accounting, Auditing and Financial Reports GASB: Governmental Accounting Standards Board GFOA: Government Finance Officers Association HTAX: Hospitality Tax IT: Information Technology LCOG: Lowcountry Council of Government MID: Municipal Improvement District MS4: Municipal Separate Storm Sewer System MZDO: Municipal Zoning and Development Ordinance PRT: Parks, Recreation & Tourism Department PO: Purchase Order 155 PPE: P ersonal Protective Equipment TBD: To Be Determined 156 157 158 159 160 161 162 163 164 165 166 S T A Y C O N N E C T E D F o l l o w u s o n S o c i a l m e d i a 167

Source: City of Hardeeville website. First collected Oct 17, 2026.