cal Year 2025 Adopted Budget
July 1, 2024 - June 30, 2025
G
OVERNMENT FINANCE OFFICERS ASSOCIATION
Distinguished
Budget Presentation
Award
P
RESENTED TO
City of Hardeeville
South Carolina
For the Fiscal Year Beginning
July 01, 2023
Executive Director
The Government Finance Officers Association of the United States and Canada (GFOA) presented a Distinguished
Budget Presentation Award to the City of Hardeeville, South Carolina for its annual budget for the Fiscal Year
beginning July 1, 2024. In order to receive this award, a governmental unit must publish a budget document that meets
program criteria as a policy document, as an operations guide, as a financial plan, and as a communications device.
This award is valid for a period of one year only. We believe our current budget continues to conform to program
requirements, and we are submitting it to GFOA to determine its eligibility for another award.
April 12, 2024
To the Honorable Mayor Williams and Members of the City Council:
The budget preparation process that began in late January is entering its final stage of
development. The process began with a budget kickoff meeting where the proposed process,
objectives, expectations, and budget calendar were discussed with each of the Department
Heads and key staff members. The Department Heads then spent a month reviewing their
current budget(s) appropriation(s) and developing their anticipated needs and budget request
for the 2024/2025 fiscal year (FY25). The Finance Director, Deputy City Manager and I
then met with each Department Head to review their requests and justification for each line
item. After reconciling the Departments requests, we prepared the proposed budget
including the preliminary millage rate, taxable value projections, new revenue sources,
capital improvement requests, additional staffing requests, FY24 year-end projections, FY25
budget request and finally proposed the tentative millage rate which was all incorporated
into the proposed budget. The budget has been balanced, reconciled, and compiled.
Therefore, with this letter, I am transmitting the proposed budget for your thorough review,
consideration, and subsequent adoption.
A cornerstone in developing the annual budget is to fully evaluate all potential and
available revenue sources and proposed expenditures to develop a proposed plan
which provides the necessary resources to fully fund municipal services by proposing
and appropriating the optimal millage rate. The City of Hardeeville over the past ten
years has been the fastest or second fastest growing community in population, by
annual percentage rate, in the State of South Carolina.
The
City's prime location is in the heart of the lowcountry between Savannah and Hilton
Head, the seasonal weather and the area cultural resources make it a wonderful place to
reside. New home construction has been measurably increasing over the past five years
with over 1,175 new homes built in 2023. The City in FY25 is expected to issue over
1,200 single family building permits, the most in the City's history. This substantial
annual growth significantly adds to the City's total assessed property value, which
increased 11.5% in FY24 and is projected to increase significantly by 31.3% in FY25.
This significant increase in property values provides the City Council with unique
opportunities to provide needed funding for critical capital improvement projects,
providing new and enhancing public service delivery, additional staffing needs, and
enhancing the overall quality of life in our community. To meet the challenges of a
growing population in our community and continue to provide a high level of municipal
services, the City's Department Heads requested a total of 25 new full-time equivalent
positions costing approximately $1.4M annually "all in". In addition to the staffing
requests, there was also a corresponding substantial list of necessary capital improvement
projects, equipment, and vehicle purchases.
The City has been a very good fiscal steward and has had the ability and collective
p
olitical will to reduce the City's millage rate for FY 2013-24 which reduced the millage
from 153 to 96 mills in the Jasper County portion of the city. These persistent efforts
allowed the City to be competitive in attracting new business and industry to our
community and provided the taxpayers with needed fiscal relief. This year, with the
proposed robust capital improvements program to improve the facilities, infrastructure
and programs for our residents and the increasing cost to provide our high level of public
services we are recommending that the Council to maintain the existing millage rate for
FY25. Of course, the decision to set the final millage rate solely lies within the purview
of the City Council.
The City c ontinues to be fiscally responsible and at the end of FY24 has a healthy budget
stabilization fund balance which equals a General Fund balance of 20% of the annual
expenditures or 2.4 months of expenditures set aside as an "emergency fund/rainy day".
The City's total projected FY24 unreserved fund balance is $3,667,000 with an additional
$324,000 reserved for the Economic Development Fund, and $2,669.000 Land Acquisition
Fund. The proposed FY25 budget projects a year end unreserved balance of $3,667.000.
The proposed allocation of the City's reserves continues to promote a strong financial
position for our community, while also providing an "insurance policy" to fund unexpected
expenditures or a shortfall in projected revenue or unexpected expenses.
Upon review of the City's audit regarding historical full-time staffing equivalents, the
C
ity has maintained a small work force even with the City's rapid expansion in area from
5 square miles to 58+ square miles and the population more than tripling over the past
ten years. The FY24 budget had appropriated funds for 156 full-time equivalents in the
City's sixteen General Fund Departments. The City's Department Heads submitted
requests for additional personnel to meet the growing needs and service demands with
their budget proposal. After careful consideration and review of the merits of each
personnel request, the proposed FY24 budget proposes an additional 10 full-time and 4
part-time positions. The following positions are proposed to be funded:
✓ P olice Officers (3)
✓ FD Records Specialist, PT Paramedic (4)
✓ Building Inspector
✓ Financial Analyst
✓ Recreation Complex Supervisor
✓ Maintenance Tech I and Maintenance Tech II
✓ Network Administrator
These proposed positions will not be immediately staffed and will be phased in based on
the need to staff new public facilities, or a critical need for the position. These positions
are vitally needed to meet the increasing workload and demands of community growth
and to reduce the overall burden on the existing workforce. The proposed budget also
contains a 4.5% cost of living increase for the City's employees. Please see Exhibit A for
the proposed positions job description and a justification for each position as well.
The proposed budget contains a newly developed and healthy Capital Projects and
Improvements plan which sets out a "roadmap" to enhance our facilities and increase the
overall quality of life in our community. Projects will be financed by a combination of
Federal and State Grants, Development Agreement voluntary contributions, American
Rescue Plan proceeds, proceeds from new debt, and existing City resources. The City's
proposed CIP Plan mirrors and compliments the City's adopted Short- and Long-Term Goals
and Objectives. The proposed Capital Improvement Plan additions are projected to be
approximately ($24,500,000) including ($975,000) for vehicles and equipment. The most
other notable projects include:
($12,200,000) for new public buildings or facilities or expansions to existing
facilities. ($10,200,000) for infrastructure, storm drainage projects and/or street or
highway projects.
The City's elected and appointed officials will continue to collaborate, cooperate, be
creative and be willing to consider unconventional approaches and partnerships to
navigate through these unchartered waters and to meet our stated mission, goals, and
objectives. Our City continues to be blessed with a committed group of Department
Heads and employees who work hard every day to serve the citizens of our community,
and I want to acknowledge their dedication and continuing contributions. In closing this
message, I want to extend my deepest appreciation to our Finance Director, Mr. John
Boyle and Mr. Matt Davis, Deputy City Manager for their wisdom and expertise in
providing invaluable assistance and recommendations in the development of this
proposed document. This budget is not the City Manager's budget or the City Council's
budget but a guiding document that is owned by all that helped prepare it.
This will be the last budget that I will present to the City Council, and we have
continually strived to enhance the budget development process, increase transparency
and understanding, and improve the overall appearance and usefulness of the
document. I believe we have met those objectives. We look forward to meeting with
you to present this proposed budget.
cc Robin Connor-Payne, City Clerk
John Boyle, Finance Director
Prina Maines, City Attorney
TABLE OF CONTENTS:
CITY MANAGERS LETTER TRANSMITTING PROPOSED BUDGET TO CITY
COUNCIL
PREFACE ......................................................................................................................................................... 8
BASIS OF BUDGETING AND ACCOUNTING ......................................................................................... 8
FUND STRUCTURE .................................................................................................................................... 8
BUDGET OVERVIEW PROCESS ............................................................................................................... 9
FY25 BUDGET CALENDAR .................................................................................................................... 10
INTRODUCTION .......................................................................................................................................... 11
CITY MISSION STATEMENT .................................................................................................................. 11
COUNCIL GOALS ..................................................................................................................................... 11
CITY OF HARDEEVILLE GOVERNMENT OVERVIEW ....................................................................... 26
THE CITY’S ORGANIZATION CHART is depicted on the following page. ........................................... 26
CITY OF HARDEEVILLE AT A GLANCE ............................................................................................. 28
ECONOMY ................................................................................................................................................ 29
FINANCIAL POLICIES ................................................................................................................................. 31
FUND BALANCE .......................................................................................................................................... 32
DEBT .......................................................................................................................................................... 33
BOND RATING ......................................................................................................................................... 34
CONSOLIDATED BUDGET ......................................................................................................................... 35
MANAGEMENT SUMMARY .................................................................................................................. 35
BUDGET SUMMARY ............................................................................................................................... 35
CHANGES TO PROPOSED BUDGET ...................................................................................................... 39
BUDGET TRENDS .................................................................................................................................... 40
MILLAGE ................................................................................................................................................... 41
GENERAL FUND BALANCE ................................................................................................................... 42
REVENUE PROJECTIONS ....................................................................................................................... 42
GENERAL FUND REVENUE COMPARISON ........................................................................................ 43
GENERAL FUND EXPENDITURE COMPARISON ................................................................................ 44
DEPARTMENTAL SUMMARIES, GOALS AND BUDGET DISCUSSION .............................................. 46
GENERAL GOVERNMENT ..................................................................................................................... 46
CITY COUNCIL ......................................................................................................................................... 46
POLICE ....................................................................................................................................................... 47
FIRE ............................................................................................................................................................ 50
PUBLIC WORKS ....................................................................................................................................... 55
PARKS, RECREATION AND TOURISM DEPARTMENT ..................................................................... 58
MUNICIPAL COURT ................................................................................................................................. 60
PLANNING ................................................................................................................................................ 61
COMMUNICATION, INFORMATION AND DIGITAL SERVICES ....................................................... 63
BUILDING ................................................................................................................................................. 65
FINANCE ................................................................................................................................................... 67
WORKFORCE DEVELOPMENT ............................................................................................................. 69
SAFETY AND RISK MANAGEMENT ..................................................................................................... 70
FACILITY MAINTENANCE .................................................................................................................... 71
DEBT SERVICE ......................................................................................................................................... 71
FESTIVAL ON MAIN ................................................................................................................................ 71
PERSONNEL SUMMARY ............................................................................................................................ 72
CAPITAL IMPROVEMENT PLAN ............................................................................................................... 73
APPENDIX ................................................................................................................................................... 284
THE BUDGET ORDINANCE is attached on the following pages. ......................................................... 284
GLOSSERY OF TERMS .......................................................................................................................... 293
GLOSSERY OF ACRONYMS ................................................................................................................. 297
8
PREFACE
BAS
IS OF BUDGETING AND ACCOUNTING
T
he terms “basis of budgeting” and “basis of accounting” are used to describe the recognition of
transactions or events that are to be recognized. The budget is prepared using the modified accrual
basis of accounting which is a combination of cash basis and full accrual basis. Modified accrual
accounting recognizes revenues when they become measurable and available. Measurable means
that the dollar value of the revenue is known or can be reasonably estimated. Available means that
it is collectible within the current period or soon enough after the end of the current period to
pay current expenditures. Expenditures are recorded when the liability is incurred and not
based on cash flow. Revenues related to the current period are generally considered to be
available if they are collected within 60 days of the end of the current period. All expenditures
incurred during the current period are accrued and are general cash flowed within the 60 days as
well. Appropriations lapse at year end; however, encumbrances and amounts specifically
designed to be carried forward (i.e., multi-year capital projects and approved grants) to the
subsequent year are reappropriated in the following year.
Th
e City reports financial information on a fund basis in accordance with generally
accepted accounting principles (GAAP). Depreciation and amortization, which are considered
expenses on the GAAP basis of accounting, are ignored under the budget basis because these
items do not require an expenditure of funds. If transactions are not a current resource or use,
they are reported in the operating fund of the fund financial statement. Under GASB 34,
noncurrent activities (i.e., capital assets or long-term liabilities) are reported on government-wide
statements only.
FUND STRUCTURE
The City maintains the following governmental funds which are subject to appropriation. The
General Fund is the City’s primary operating fund. It accounts for all financial resources of the
City except those required to be accounted for in another fund. Departments included in the
9
general fund are: General Government, Police, Fire, Public Works, Recreation, City Council,
Municipal Court, Planning and Development, Building Services, Finance, Workforce
Development, Communication, Information, Technology and Data Services (CIDS), Facility
Maintenance, Safety/Risk Management, Debt Service and Festival on Main.
T
he Development Fund represents the City’s receipts and disbursements for Developer Agreement
(DA) developer fees negotiated under developer agreements. The Capital Projects Fund accounts
for the acquisition of capital assets and construction or improvement of major capital projects such
as the construction of new roads.
N
onmajor Governmental Funds include eight Special Revenue Funds used to account for revenue
sources that are legally restricted to expenditure for specific purposes. These funds are: Indirect
ATAX, Direct ATAX, Local ATAX, Local HTAX, Victim’s Assistance, Fire, Police Funds and
The Hardeeville Transformation Foundation.
BUDGET OVERVIEW PROCESS
Budget preparation commenced in late January with the City Manager meeting with Department
Heads and key staff to review the process, objectives, expectations, and budget schedule.
Department Heads reviewed FY24 year to date results and other data to proje ct their anticipated
needs for FY25. Budgets were then reviewed in detail with the City Manager, Deputy City
Manager, and Finance Director.
While departmental budget requests were being prepared, department heads were assessing their
capital needs. Capital requests were finalized, compiled, and reviewed. Each project was reviewed
individually and considered collectively based on the availability of funding for Capital Projects.
Note that a project not being funded is not a reflection of the merits or importance of the request,
but rather the result of limited funding for such projects.
Revenue projections are developed and potential changes to the millage rate are reviewed as the
budget is balanced, reconciled, and compiled. The City of Hardeeville FY25 budget includes a
millage rate reduction of 2 mill.
10
On April 12, 2024, the City Manager transmitted the proposed budget to City Council for their
review, consideration, and adoption. City Council’s review included budget workshops. Budget
workshops were held February 12, 2024, April 23, 2024, and May 1, 2024, to provide Council and
the public opportunity to pose questions, receive additional information and provide input on the
budget. (Note: All workshops and public hearings are advertised and open to the public and
citizens are encouraged to participate in the process and provide input either in person or through
live stream media.) Based on input from Council, staff revises the budget as appropriate.
In accordance with South Carolina law, public hearings were held on May 16, 2024, and June 6,
2024, and the budget was adopted by Council on June 6, 2024.
FY25 BUDGET CALENDAR
January 24 Budget Kick-off Meeting- City Manager met with Department Heads to outline the
schedule for preparing the FY 25 Budget
February 12 City Council Budget Workshop One
Initial Budget Requests, Revenue Projections, Statement of Level of Service, five-
February 19 year Capital Improvements Plan, Department Mission Statements, Goals and
Objectives due to Finance.
February 20 - March 8 City Manager and Finance Director review requests and meet with Department Heads
to review and revise departmental budgets.
March 14 - March 22 City Manager and Finance Director meet with City Council Members individually to
discuss preliminary budget proposals.
March 25 - April 12 City Manager prepares Proposed Budget.
April 12 Submission of Proposed Budget to City Council.
April 23 City Council Budget Workshop Two.
May 1 City Council Budget Workshop Three.
May 16 First Reading of proposed FY 25 Budget Ordinance and Public Hearing.
June 6 Second and Final Reading of Budget, Public Hearing and Approval of Budget and
FY 25 Millage Rate.
July 1 New Fiscal Year Begins.
11
INTRODUCTION
CITY MISSION STATEMENT
The City of Hardeeville, South Carolina is in partnership with our community and works to protect
and enhance the quality of life by providing a high level of service in an efficient and responsive
manner for all citizens.
The primary goal of the City is to support the success and wellbeing of the community by
maximizing our resources (services, programs, facilities and financial assets) while being good
stewards of public funds to provide the greatest possible benefits for all citizens, visitors and
businesses.
The City recognizes that as it continues to grow and develop it must be flexible in implementing
various changes in efforts to continue to provide successful levels of programs and services.
COUNCIL GOALS
Acknowledging the need to periodically review operations, and the challenges and opportunities
facing Hardeeville, City Council conducts an annual retreat. The most recent retreat was conducted
on January 16, 2024. That day, the City Council, Administration, and Department Heads worked
collaboratively to identify priorities for the City. Pursuant to the retreat and subsequent
discussions, City Council, at its February 15, 2024, meeting adopted Resolution 2024- 2-15B.
Pursuant to the resolution above, City Council and staff focus their energy and resources
on
accomplishing the objectives included therein. On an ongoing basis, not solely during the budget
process, the City Manager and staff consider these goals, the impact of growth and the cost and
impact of ongoing services. The goals below provide guidance on the Council’s desired direction
and initiatives in the immediate, intermediate and long term.
The 6 Goals and 25 Objectives identified and adopted by City Council can be found on the
fourteen pages that follow.
12
GOVERNANCE & ADMINISTRATION
Goals Objectives Tactics Responsibility Timeframe /
Status
Outcome/Metrics
Build strong
connections with
community
partners,
residents, and
employees
1. Improve our relations
and cooperative efforts
with Jasper County
Council to propose a meeting, face to face,
Council to Council, to explore mutual goals and
expectations and consider various perspectives.
Use new members as opportunity for new
relationship liaisons
Council-Mayor
City Manager
2X Per Year
Progressing
- Two-way
communication
and cooperation
- See progress in
County + City
efforts.
- COH Council
attends 50% of
County Council
meetings.
- Co-host 2 events
in 2024
City Council attend Council meetings Council-Mayor Monthly
Ongoing
Cohost lunch and learn workshops Council-Mayor
City Manager
1X Quarter
Initiate
Coordinate with Jasper collaborative, and joint
decision-making Administration/
Council/Planning
FY 2024/2025
Progressing
2. Improve regional
cooperative efforts with
Beaufort County and
other municipalities.
Council and Administration explore mutual
regional goals and expectations with Beaufort
County and neighboring municipalities.
Schedules meetings or lunches periodically for
additional insight and regional
Council-Mayor
Administration
2X Per Year
Initiate
- Two-way
communication
and cooperation.
3. Enhance two-way
communication
internally & externally
to increase effectiveness,
efficiency, and
transparency.
EXTERNAL
Craft a comprehensive, proactive citywide
communication plan Communication
Committee
FY 2025
Progressing
- Improve city
wide
communication
Organize City-Wide Debates Communication,
IT & Digital
Solutions/
Administration/
Mayor
Priority Project
FY 2024/2025
Initiate
- Organize and
host 2 debates
13
Create a unity campaign and city slogan Communication
Committee
Priority Project
Fall FY 2025
Initiate
- Increase
followers on
social media
- Reduce citizen
inquiry calls
- Provide regular
website analytics
to
communication
committee and
administration
- Track FB and
Social Media
interactions
during meetings
- Track attendance
at speaking
events
- Promote Don
Ryan Center
utilization and
meeting
attendance
- Establish a
virtual wall of
honor
Put QR codes on business cards and signage that
take citizens to helpful website information Communication
Committee
Priority Project
FY 2024/2025
Initiate
Update the website for ease of access of key info Communication,
IT & Digital
Solutions
FY 2024/
Progressing
Empower the media department to seek & receive
updates to share from all departments through a
formalized process
Communication,
IT & Digital
Solutions
FY 2024/
Progressing
Incorporate language translation into
website/social media/ printed documents and in-
person meetings
Communication,
IT & Digital
Solutions
Priority Project
FY 2024/2025
Progressing
Townhall meetings, visit neighborhoods, utilize
neighborhood marketing, utilize email & text
campaign: share positive stories, give quick short
updates
Communication,
IT & Digital
Solutions/
Administration/
Mayor
Priority Project
FY 2024/2025
Progressing
Introduce new communication techniques and
strategies.
Communication,
IT & Digital
Solutions/
Communication
Committee
Priority Project
FY 2024/2025
Progressing
Improve City television services with additional
programs, interviews, and events
Communication,
IT & Digital
Solutions/
FY 2024/2025
Progressing
Educate citizenry to increase awareness of the
Beaufort County and Jasper County Sales Tax
Referendum
Communication,
IT & Digital
Solutions/
Administration/
Council
Priority Project
FY 2024/2025
Initiate
14
Improve visibility and understanding of City
goals and objectives through the use of visual
displays, digital media spotlights, and increased
status updates
Communication,
IT & Digital
Solutions
FY 2024/2025
Progressing
Establish a virtual wall of honor at City Hall Communication,
IT & Digital
Solutions/
Administration
Priority Project
FY 2024/2025
Progressing
Promote nonprofit service partners to help
address city challenges
Communication,
IT & Digital
Solutions/
Administration/
Council
FY 2024/2025
Progressing
INTERNAL
Streamline documents for easy skimming of key
info (e.g., what’s shared with council)
Communication,
IT & Digital
Solutions/
Administration
FY 2024/2025
Progressing
- Introduce 4 new
inclusive city-
wide training
and social
events
opportunities
- Complete 10
lunch and learns
sessions with
Council and
Departments
- Develop
incentives for
health and
wellness
participation
Establish and formalize templates for consistent
branding (e.g., ppts, reports, website, social
media)
Communication,
IT & Digital
Solutions/
Communication
Committee
FY 2024/2025
Progressing
Increase off-camera interactions between council
and staff to improve interaction through
scheduled events, outside meetings and other
activities.
Council/
Administration/
Department
Director
FY 2024/2025
Progressing
Increase training and group participation
opportunities between all staff, improve
workplace culture
Administration/
Department/
Outside Services
FY 2024/2025
Progressing
Monthly lunch and learn opportunities with
designated departments and Council members
Council/
Administration/
Department
Director
Priority Project
FY 2024/2025
Progressing
15
Improve utilization of digital tools and resources
to improve quality of services being delivered.
Communication,
IT & Digital
Solution
FY 2024/2025
Progressing
Evaluate and select project management software
to enable real time updates of projects and goals
CIP Manager/
Communication,
IT & Digital
Solutions
/Administration
FY 2024/2025
Progressing
Promote health and wellness opportunities for
staff
Safety and Risk
Management
Committee/Health
and Wellness
Committee
FY 2024/2025
Progressing
More open dialogue and workshops so all are
well informed
Administration/
Council
FY 2024/2025
Progressing
Open communication to improve transparency
and efficiency
CIP Manager/
Communication,
IT & Digital
Solutions
/Administration
FY 2024/2025
Progressing
Develop a reference sheet for education on
standards
Administration/
Council/ Planning
& Development
FY 2024/2025
Progressing
Develop a clear process & policy for new &
existing developing including items such as
wetlands, tree cutting, traffic, green spaces,
multiple entrances using the updated MZDO
Administration/
Council/ Planning
FY 2024/2025
Progressing
Help search for volunteers to join historical
society Council/
Communication,
IT & Digital
Solution
Priority Project
FY 2024/2025
Initiate
16
Goals Objectives Tactics Responsibility Timeframe /
Status
Outcome/Metrics
Produce high-
quality services to
the community
through a
commitment to
local government
best practices and
employee
development,
support, and
retention.
1. Align City staffing
strategies with growth
and development goals
and increase job training
for the new workforce.
Develop a comprehensive staffing plan across
departments including recruiting and retaining
efforts to adequately staff the city, develop
transition plans associated with retirements and
departures.
HR/
Administration
Priority Project
FY 2024/2025
Progressing
- Increase citywide
staff by 10%
- Retain 90% of
existing staff
Analyze opportunities to add relevant new
workforce training programs
Administration/
Council
FY 2024/2025
Progressing
Partner with other organization to host job fairs
and setup informational booths at events
HR/
Administration
FY 2024/2025
Progressing
2. Analysis of existing and
future resources to meet
the demands of a
growing city
Identify resources and align resources with
anticipated growth Administration/
Council/
Departments
FY 2024/2025
Progressing
3. Administrative and
operation improvements
Focus on improvements to P3 – policy,
procedures, process for city departments
Administration/
Council/
Departments
FY 2024/2025
Progressing
4. Hire necessary new
support and
administration staff to
meet demands of
growing city (Finance,
Housing-Community
Services, HR)
Establish a new position that focus on housing in
the city, region, and work to address community
services needs including challenges associated
with homelessness, job availability and
transportation
Administration
Priority Project
FY 2024/2025
Progressing
5. Regional solutions for
increasing community
challenges
Establish regional subcommittees including one
focused on the increasing challenge of
homelessness
Administration/
Council/
Priority Project
FY 2024/2025
Progressing
17
ECONOMIC & COMMUNITY DEVELOPMENT
Goals Objectives Tactic Responsibility Timeframe /
Status
Outcome/Metric
Capitalize on the
growth and
development to
expand and
enhance the city.
while creating a
financially
healthy,
sustainable, and
desirable
community.
1. Development attainable
housing through the city
Create a workforce and attainable housing template
for developers to partner with the city for possible
housing solutions
Mayor/
Administration
Priority
Project
FY 2024/2025
Progressing
- Increase
availability of
total number of
units
2. Revitalizing downtown
New additional COH
facilities (including City
Hall and Police Station,
beautify the downtown
area, improve Whyte
Hardee Blvd., develop
Veterans Park and
construct Municipal Hub
Implementation Strategy for Whyte Hardee Blvd
including traffic calming, landscape, increase
private/public partnerships, purchase available
property.
Council/
Administration/
Planning/CIP
Manager
Priority
Project
FY 2024/2025
Progressing
Construct Veterans Park Council/
Administration/
Planning/CIP
Manager
Priority
Project
FY 2024/2025
Progressing
Move forward with City Hall expansion plans Administration/
CIP Manager/
FY 2024/2025
Initiate
Complete analysis for new police station location
and move forward determining financing alternatives
Administration/
CIP Manager
/Police
Department
FY 2024/2025
Initiate
Explore the feasibility of providing space for various
non-profit organizations such as Volunteers in
Medicine, Lowcountry Legal, Bluffton Self Help
Administration/
CIP
FY 2024/2025
Initiate
Upgrades to City Hall Lobby Administration/
CIP
FY 2024/2025
Progressing
3. Address other COH
facility needs
Design, permit and construct new Fire station 82 Administration/
CIP Manager
/Fire Department
Priority
Project
FY 2024/2025
Progressing
18
Determination use of Old City Hall building and
remodel as necessary
Administration/
CIP Manager/
Public Works
Priority
Project
FY 2024/2025
Progressing
Determination use of 102 and 104 main street
properties and remodel house as necessary
Administration/
CIP Manager/
Public Works
Priority
Project
FY 2024/2025
Progressing
Work with library management and leadership for
space improvements and/or expansion
Administration/
CIP Manager/
FY 2024/2025
Initiate
Explore the use of solar energy with new building
development
CIP Manager/
Public Works
FY 2025
Initiate
4. Actively work to recruit
new commercial and
industrial businesses to
the city
Work with developers and public/partnerships to
attract new businesses to the city. Mayor/
Administration
FY 2024/2025
Progressing
5. Manage our shared
infrastructure by
beautifying the median
along 278
Partner with local jurisdictions and community
partners to address median beautification Administration/
Planning/CIP/
Public Works
FY 2025
Initiate
19
TRANSPORTATION & INFRASTRUCTURE
Goals Objectives Tactics Responsibility Timeframe /
Status
Outcome/Metric
Facilitate the
development of
efficient and
effective
transportation
systems that
provide for both
local and regional
needs and
strengthen the
city’s partnerships
with public
utilities to improve
city-wide
infrastructure.
1. Transportation
improvements through
road construction and
traffic solutions
Complete Regional Traffic Analysis through
coordination with LCOG and LATS
Administration/
Council/
FY 2024
Progressing
Work with DOT to install traffic signals along
Argent Blvd.
Administration
Priority
Project
FY 2024/2025
Progressing
Work with DOT to install traffic signals along
US278
Administration
Priority
Project
FY 2024/2025
Progressing
Work with Beaufort County/Jasper County to
implement traffic improvement strategies for the
Triangle project.
Administration
Priority
Project
FY 2024/2025
Progressing
Evaluate the need and determine resources for COH
Road Department to maintain new city owned roads
Administration/
Public Works/
CIP Manager
FY 2024/2025
Progressing
Work with DOT, Jasper County, and developer for
the construction of the Exit 3 project
Mayor/
Administration
FY 2024/2025
Progressing
Work with DOT in regards I-95 widening project,
Exit 5, Exit 8, John Smith Road
Administration/
Planning
FY 2024/2025
Progressing
2. Prepare core
infrastructure for
economic development
of new business
Bring natural gas lines to Whyte Hardee Blvd at SC
46 through collaboration with Dominion
Administration FY 2024/2025
Progressing
20
3. Proactively prepare our
infrastructure for
growth by developing a
Stormwater Master
Plan to inform the
design of new
development.
Implement new stormwater projects as determined
by master plan
Administration/
Public Works/
CIP Manager
FY 2024/2025
Progressing
4. Utility improvements
citywide
Work with BJWSA, Dominion and Palmetto Electric
to advance water, wastewater, and electric to
adequately service new commercial and industrial
growth and development.
Administration
Priority
Project
FY 2024/2025
Progressing
21
COMMUNITY ENGAGEMENT
Goal Objective Tactics Responsibility Timeframe /
Status
Outcome/Metric
Provide solutions
that promote
community
growth and
innovation,
including
implementing
strategies to
improve quality
of life and
community
service needs
throughout the
city.
1. Develop a
comprehensive
recreational plan for the
COH that allows for
proactive, relevant
programming.
Engage an outside contractor for independent
evaluation and assessment
PRT/
Administration/
CIP Manager
FY 2024/2025
Initiate
Include in the plan the development of Millstone
Landing along the Savannah River to coincide
development with RiverPort Parkway North and
Exit 3
PRT/
Administration/
CIP Manager
FY 2024/2025
Initiate
5. Meet with
RiverPort
Developer and
identify partner
opportunities
Increase staff in Recreation & Tourism to support
expanded programming
PRT/
Administration
FY 2024/2025
Progressing
- Increase sports
related
programming by
10%
- Two new sports
teams
- Host one sports
tournament.
Develop the next section Richard Gray Sports
Complex trail for connectivity to Recreational
Complex
PRT/
Administration/
CIP Manager
FY 2024/2025
Progressing
6. Complete
second section
of trail
Construct additional phases of the Richard Sports
Complex including the Ju Ju Hutson Park &
Playground
PRT/
CIP Manager/
Public Works
FY 2024/2025
Progressing
7. Complete
Winter 2024.
22
Work with developers to acquire ROW to develop
bike and pedestrian lanes throughout the city:
- Work with East Argent Road development for
trail development through community
- Work with Dominion Energy for right of way
use for new trail development
- Work with Heron Point to complete downtown
trail development
Administration/
PRT/
FY 2024/2025
Initiate
2. Develop and
communicate a
citywide event strategy
for continuing events
and festivals and
introducing and
implementing new
events
Develop criteria for introducing new events and
festivals including additional staff needed
Administration/
PRT/
FY 2024/2025
Progressing
3. Engage the community
for insight and
participation for
holiday related events
Community-wide survey and interviews related to
holiday events and festivals.
Efforts to increase volunteerism
PRT FY 2024/2025
Progressing
4. Use the conservation
easement to develop a
passive recreation
center for the region
Develop a master plan for the conservation area
once the area becomes accessible with the new road
development
Administration/
PRT/
Planning &
Development
FY 2025
Initiate
5. Utilize regional
resources to address
city challenges
Partner with community groups and nonprofits for
collaborative efforts to improve quality of life
throughout the city
Administration/
Council
FY 2024/2025
Progressing
23
PUBLIC SAFETY & SECURITY
Goals Objectives Tactics Responsibility Timeframe /
Status
Outcome/Metrics
Implement
strategies to
strengthen the
city’s quality of
life by improving
the health, safety
and security for
residents and
visors alike
1. Provide public safety
services to all City
residents, businesses,
visitors, and employees
in an efficient, timely,
and fiscally responsible
manner.
Assess all existing resources and the need for future
resources
Fire Department/
EMS/Police
Department/
Administration
FY 2024/2025
Progressing
- Meet and exceed
national
standards.
- Increase in public
outreach and
education touch
points
- CJIS compliance
- Certifications for
training
- ISO Rating
maintained
- Traffic tickets
- Increase PD staff
by 5 new officers
- Hire new EMS
service providers
Identify response areas (zones) and needs within
each
Fire Department/
EMS/
Police
Department/
Administration
FY 2024/2025
Progressing
Secure budget to increase staff through focused
recruitment and retention efforts for fire department,
EMS, and police department
Fire Department/
EMS/
Police
Department/HR/
Administration
FY 2024/2025
Progressing
Use GIS and AI for more data-driven solutions for
citywide safety
Fire Department/
EMS/ Public
Works/ Police
Department/
Administration
FY 2024/2025
Progressing
Conduct citywide scenario-based training (fire drills
and active shooting) using POC – plan of action
including hospitals, schools
Fire Department/
EMS/
Police
Department/t/
Administration
FY 2024/2025
Progressing
24
Create Emergency Management Division Administration/
Fire Department/
EMS/
Police
Department
FY 2024/2025
Progressing
Research and conduct applicable OSHA for all
public works staff Public Works FY 2024/2025
Initiate
Assess cybersecurity needs Communication,
IT & Digital
Solution
FY 2024/2025
Progressing
Encourage community policing / watch programs Police
Department
FY 2024/2025
Progressing
Develop an equipment replacement plan for each
public safety department
Administration/
Fire Department/
EMS/
Police
Department
FY 2024/2025
Progressing
Improve city-wide safety measures Fire
Department/EMS
Police
Department
FY 2024/2025
Progressing
2. Improve traffic safety
through a multi-
strategy approach
Increase speeding citations Police
Department
FY 2024/2025
Progressing
10% increase in
citations by ?
Add additional officers to assist with traffic control
along Argent Blvd, US 278, and John Smith Road
Police
Department
FY 2024/2025
Progressing
25
Reduce distracted driving through increased
partnership with state and local law enforcement,
attendance at networking events, and increased
traffic enforcement
Police
Department/
Community
Partners
FY 2024/2025
Progressing
3. Develop a COH public
health policy and
process to prepare for
future health
emergencies
Provide training regarding public health
emergencies
Fire Department/
EMS/Police
FY 2024/2025
Progressing
26
CITY OF HARDEEVILLE GOVERNMENT OVERVIEW
The City of Hardeeville operates under the Council-Manager form of government. Policy making
and legislative authority are vested in a governing council consisting of five members. The
governing council’s responsibilities include, but are not limited to, passing ordinances, adopting
the budget, appointing committees, hiring the government’s manager, and appointing the
municipal judge, and attorney.
The City Manager is responsible for carrying out policies and ordinances of the governing council,
for overseeing the day- to-day operations of the City, and for hiring the heads of various
departments. The four (4) Council members and Mayor are each elected to four -year staggered
terms; with two (2) council members being elected every two (2) years and the other two (2)
council members and Mayor running during the next election year. Municipal elections occur in
November of even numbered years. The four-year terms begin in January of the year following
the election.
The City provides a full range of services including police and fire protection, maintenance of
streets and parks, recreational activities, cultural events, court services, planning, building &
development services, code enforcement, economic and community development and media
coverage.
THE CITY’S ORGANIZATION CHART is depicted on the following page.
Mayor & City Council
Muncipal Judge City Attorney
Deputy City Manager
Police Chief
Public Works Director
Finance Director
City Manager
Assistant City Manager
City Clerk
Fire Chief
Communication, IT, and
Digital Solutions
Director
Human ResourcesDirector
Capital ImprovementProgram Director
Planning & Development Director
Parks, Recreation, & Tourism Director
City of Hardeeville
Organizational Chart
Citizens
Building Official
28
CITY OF HARDEEVILLE AT A GLANCE
The I-95 corridor provides an accessible route for Hardeeville to capitalize on nearby major urban
and tourist markets such as Hilton Head, Savannah, and Charleston. Another asset is the proximity
to the three major cities of the southeast - Jacksonville, Atlanta, and Charlotte. The City of
Hardeeville’s I-95 location enables easy access to Savannah/Hilton Head International Airport, the
Port of Savannah, the future Jasper Ocean Terminal and to major rail services.
In recent years, the City of Hardeeville and Jasper County experienced increased economic
opportunity and population growth complimenting the growth of Beaufort County and the Town
of Bluffton. As City leadership saw growth in these neighboring communities, they developed and
implemented a long -term plan with a vision focused on economic development, the addition of
quality housing options for residents and providing quality recreational opportunities for the
citizenry.
Hardeeville’s growth included annexing large tracts of land along US 278, US 17, and the I -95
corridor. Through these annexations, the City of Hardeeville grew more than tenfold. The City
grew from five square miles in 2000 to fifty- eight square miles in 2022. With this exponential
growth, the City of Hardeeville is the fastest growing municipality in SC over the last ten years.
The City’s expansion, especially along the US 278 corridor from I-95 Exit 8 to Beaufort County,
29
has generated limited commercial development and the development of quality housing in
communities such as Sun City, Hilton Head Lakes and Latitude Margaritaville. These residential
communities continue to expand, and other new developments are underway, further increasing
the availability of housing and commercial opportunities in the East Argent and West Argent
communities along with areas along US 278.
A once rural city located along the I-95 corridor in the Lowcountry of South Carolina, the City of
Hardeeville continues to experience increased growth and development. The City now
encompasses over fifty -eight square miles and continues to receive and review additional
development opportunities. Hardeeville’s population continues to grow, and the estimated 2024
population 14,000 residents. Most of Hardeeville is located within Jasper County, with the balance
located in Beaufort County. The City of Hardeevi lle is a diverse community. A sampling of that
population diversity:
33% African American and Hispanic
8% Age 18 and under
37% Age 65 and over
The City of Hardeeville projects its population will exceed 31,000 residents by the year 2030.
Current and planned development will add 10,000 residential units over the next ten years. In
addition to this residential growth, an additional 12 million squar e feet of commercial space
(hotels, restaurants, and various retail establishments) will be added over this timeframe as well.
The City has already begun planning for the increased demand for programs and services.
Initiatives include promoting new communi ty services, the increased need for healthcare and
assisted living facilities and affordable workforce housing.
ECONOMY
The City of Hardeeville is juxtaposed between Interstate 95, and US Highways 17 and 278. The
Savannah/Hilton Head International Airport, the ports of Savannah and Charleston and a major
CSX rail trunk line are all within commuting distance. The City’s development of I-95 Exit 3 will
create a hub for three logistics transportation methods. Interstate I-95 exits 5 & 8 make Hardeeville
a gateway to the coastal communities and vacation hubs of Hilton Head and Bluffton.
30
Economic growth is strong along Hardeeville’s I -95 exits. Ongoing infrastructure improvements
from the South Carolina Department of Transportation include US 17 widening, I -95 widening
which is scheduled to start in early 2025, the addition of new Exit 3, improvements to Exit 5 and
the reconstruction of a new interchange at Exit 8 will bring new industrial, commercial and
residential growth within the city. Exit 3’s thriving logistics hub will provide direct economic
impact to the entire region and significant job growth.
Continued growth of the Port of Savannah and the establishment of the proposed Jasper Ocean
Terminal will be primary drivers in the City’s anticipated job growth in the coming years. The City
is enhancing the local impact from these industries with the Hardeeville Commerce Park and
Riverport Commerce Park. Each park will offer modern infrastructure, including roads, utilities,
and telecommunications, essential for supporting large-scale industrial activities. Their proximity
to the interstate ensures seamless access to regional and national markets. Both commerce parks
have the potential to be significant job creators, providing employment opportunities across
various sectors.
The expansion of medical and healthcare services, including the Hilton Head Regional Hospital’s
Tidewatch Free- Standing Emergency Department and Beaufort Memorial Hospital’s 70,000
square-foot medical center, have improved access to healthcare for City residents. Additionally,
these facilities provide numerous employment opportunities to Hardeeville residents.
The City provides a well -trained labor force that provides significant value to the transformation
of the local economy. Based on the Census Bureau’s 2015 - 2019 American Community Survey 5
Year Estimates, 91% of Hardeeville residents are 25 and older graduated high school and 38% of
those same residents have earned a bachelor’s degree. The City’s workforce participation is
roughly 50% of its total population due, in part, to the considerable number of retirees.
To further provide a well-trained workforce, the City of Hardeeville, in partnership with Palmetto
Training Incorporated, initiated a Career Advancement and Workforce Training program. Starting
from a grant from EJF Philanthropies, programs were established for a National Center for
Construction Education & Research (NCCER) welding certification, OSHA 10-hours construction
safety certification, forklift certification and a Commercial Driver’s License (CDL) program.
These programs continue to enroll and graduate new students, providing life changing job skills to
residents of Hardeeville and the surrounding area.
31
FINANCIAL POLICIES
The City of Hardeeville’s financial policies are governed by South Carolina state law, the City
Charter, and Generally Accepted Accounting Principles (GAAP). These laws, principles and
policies describe ways to amend the budget after adoption, budgetary controls and reporting and
appropriate methods for budgeting, accounting, and reporting. The City Manager is authorized to
make transfers provided that no such transfer shall:
1. Be made from one fund to another fund,
2. Conflict with any existing Bond Ordinance,
3. Conflict with any previously adopted policy of the City Council.
Any change in the budget which would increase or decrease total authorized expenditures must be
approved by City Council.
The accounting policies of the City of Hardeeville conform to GAAP as applicable for
governmental units. The Governmental Accounting Standards Board (GASB) is the accepted body
for establishing governmental accounting and financial reporting principles. The City’s budget is
prepared using the accrual basis of accounting. It is also the same accounting basis used for the
City’s audited financial statements. Revenues are recog nized as soon as they are considered
measurable and available. Measurable means that the dollar value of the revenue is known or can
be reasonably estimated. Available means that it is collectible within the current period or soon
enough after the end of the current period to pay current expenditures. The City considers certain
revenues related to the current period to be available if they are collected within 60 days of the end
of the current period.
Expenditures generally are recorded when a liability is incurred and not based on cash flow. All
expenditures incurred during the current period are accrued and are generally paid within 60 days
as well. All appropriations lapse at year end; however, encumbrances and amounts specifically
designed to be carried forward (i.e., multi -year capital projects and approved grants) to the
subsequent year are re-appropriated in the following year.
32
The accounts of the City are organized as funds. Each is considered a separate accounting entity.
Fund accounting is designed to demonstrate legal compliance and to aid financial management by
segregating transactions related to certain government functions or activities.
The operations of each fund are accounted for with a separate set of self -balancing accounts that
comprise its assets, liabilities, fund balance, revenues, and expenditures. South Carolina law
requires the City to adopt a balanced budget each year. A balanced budget is one in which budgeted
funding sources equal budgeted expenditures.
FUND BALANCE
Fund Balance is generally defined as the difference between a fund’s assets and liabilities. It is
intended to serve as a measure of the financial resources available in a governmental fund. It is
essential that governments maintain adequate levels of fund balance to mitigate current and future
risks, ensure stable tax rates, maintain bond rating, and not jeopardize the continuation of necessary
public services. The City Council has set a minimum fund balance target of 20% of expenditures
and recurring transfers. The City refers to this fund balance target as the budget stabilization fund.
The budget stabilization fund amounts to $5,325,890 for FY25. The total estimated fund balance
for the General Fund for the year beginning July 1, 2024, is $1,171,889. The City has committed
unreserved fund balance as follows:
The Economic Development Fund is established for marketing Hardeeville Commerce Park and
other targeted areas in the City, assisting Southern Carolina Alliance when attracting new industrial
prospects to the City by financing needed studies or infrastructu re improvements, or other
Economic Development activities recommended by the City Manager and approved by the City
Council. The Economic Development Fund Balance shall be increased by 20% of the Unassigned
Fund Balance at the end of the Fiscal Year.
The Land Acquisition Fund is established for the purchase of real property which will benefit the
community and serve a vital identified need, or other related activities as recommended by the
City Manager and approved by the City Council. The Land Acquisition Fund shall be increased
by the net proceeds of all land sales by the City of Hardeeville.
33
DEBT
The City’s FY25 budget includes additional debt for the purchase of equipment and
renovations. Debt Service (principal and interest) for FY25 Debt Service totals $2,156,504
compared to the FY24 total of $2,103,000. Debt Service the City is directly responsible for in
FY25 is $1,428,436. The remaining principal and interest payments are funded by Developer
Agreement (DA) Fees, ATAX, and HTAX.
The City incurs debt for the purchase, renovation, and construction of City facilities. City facilities
currently being financed are City Hall, Fire Department and the Hargray Building which serves as
the Fire Department Headquarters and Emergency Operations Center (EOC) building, Public
Works facility site, Police and Court building, , and the Recreation Center.
The City’s general obligation debt is limited by law to eight percent of the total assessed value of
all taxable real and personal property of the district. The latest assessed value is $128,227,077.
The legal debt limit is computed as follows:
LEGAL DEBT MARGIN CALCULATION FOR FISCAL YEAR 2025
Assessed Value 128,227,077
Debt limit (8% of assessed value) 10,258,166
Debt applicable to limit:
General Obligation Bonds -
Legal Debt Margin 10,258,166
34
CURRENT AND FUTURE DEBT PRINCIPAL AND INTEREST PAYMENT
ORIGINAL FY25 PAYMENTS PRINCIPAL AND FINAL
EXISTING DEBT
SERVICE
TERM
ISSUE
AMOUNT
PRINCIPAL
INTEREST
TOTAL
INTEREST DUE
AFTER FY25
PAYMENT
FY
Lease Purchase Series
2021B 15 Years $3,291,800 203,813 53,120 256,933 2,954,133 2037
2017 Note A Tax
Exempt 20 Years $4,722,000 200,000 114,336 314,336 4,197,552 2038
2017 Note B Non-Tax
Exempt 20 Years $816,000 44,000 22,880 66,880 831,424 2038
2018 Revenue Bond 15 Years $6,500,000 442,000 132,773 574,773 4,585,935 2033
2019 Equipment Lease 10 Years $1,446,579 129,812 15,168 144,980 652,411 2030
2019 Equipment Lease 10 Years $225,236 20,212 2,362 22,574 101,582 2030
2019 IPRB 2019 a 15 Years $2,062,000 131,000 53,693 184,693 1,577,090 2034
Funding Lease 18 Years $1,050,000 40,000 49,029 89,029 1,419,684 2041
Vehicle Lease 4 Years 1,867,00 363,000 61,217 424,217 1,273,804 2028
Gym Equipment Lease 4 Years $141,115 37,177 719 37,896 - 2025
EXISTING DEBT
SERVICE $1,611,014 $505,297 $2,116,311 $17,593,615
PROPOSED NEW
ISSUANCE
Veteran's Park/
Municipal Hub 20 Years $1,900,000 - 28,980 28,980 2,872,500 2045
City Hall Expansion 20 Years $1,000,000 - 15,255 15,255 1,511,840 2045
FS82 Rebuild 20 Years $3,050,000 - 46,530 46,530 4,611,074 2045
Vehicle & Equipment
Acquisition 5 Years $924,000 - 12,590 12,590 1,029,568 2030
PROPOSED NEW
ISSUANCE $103,355 $103,355 $10,024,982
PROPOSED FY25
DEBT SERVICE $1,611,014 $608,652 $2,219,666 $27,618,597
BOND RATING
In May 2023, Moody’s reviewed the rating below. The rating was affirmed, and no report was
issued.
Moody’s February 2024 issuer comment on the City of Hardeeville provided the following Credit
Overview:
35
The credit position for Hardeeville is solid. However, its A1 rating is a little weaker than
the US cities median of Aa3. The notable credit factors include a very healthy financial
position, a strong wealth and income profile and a sound tax base. It also reflects an
affordable debt burden and a moderate pension liability.
CONSOLIDATED BUDGET
MANAGEMENT SUMMARY
The City of Hardeeville Consolidated Municipal Budget comprises both the annual operating
budget and the capital improvement budget. The City's FY25 total budget is $76,173,257 of which
$25,290,142 is programmed for capital projects.
The Operating Budget finances the day-to-day operations of the City. The budget includes general
government administration and operations, debt service, and transfer payments for the fiscal year.
The funding for the budget is derived from taxes, fees, licenses, fines, and inter -governmental
revenues (state and federal).
The Capital Improvement Program (CIP) is a multi- year planning instrument that drives the
identification, evaluation, and financing of capital infrastructure projects. Capital projects range
from construction and renovation of municipal buildings, parks, a nd recreation facilities to
purchase of vehicles and equipment. CIP projects typically carry considerable future impact and
have a life span of five years or more.
Included are budget stabilization funds in the amount of $5,325,890.
BUDGET SUMMARY
The FY25 Summary Budget for the City of Hardeeville, with comparative data to FY23 actual and
FY24 projected amounts is presented to provide a snapshot of Fund Balance, Revenues and
Expenses.
36
Fund Balance Year Over Year Comparison
FY23 Actual FY24 Projected
FY25 Approved
Budget
Fund Balances
General Fund Balance
2,861,900
3,168,585
3,168,585
Less ARPA unspent funds 2,385,881 1,996,696 -
476,019 1,171,889 3,168,585
Land Acquisition Fund 1,300,528 2,669,000 1,459,000
Economic Development Fund 304,637 324,000 340,000
Budget Stabilization 3,467,961 3,996,489 5,325,890
37
OPERATING BUDGET SUMMARY
FY25 Approved
FY23 Actual FY24 Projected Budget
Revenue
General Fund 24,853,585 29,211,423 35,019,083
Community Foundation 580,758 697,000 694,000
State Accommodation Tax Indirect 150,000 585,779 1,589,544
State Accommodation Tax Direct 75,000 149,376 249,376
Local Accommodations Tax 1,166,373 1,222,680 1,862,680
Local Hospitality Tax 1,324,902 1,634,297 2,254,297
Investment and DA Fees 4,552,457 8,865,939 9,214,135
Five Year CIP 14,325,471 16,634,653 25,290,142
Total Revenue 47,028,546 59,001,147 76,173,257
General Government
6,669,032
7,828,430
10,157,011
Police 3,631,072 5,002,464 5,983,450
Fire 4,727,569 6,434,372 7,546,436
Public Works 1,023,405 1,199,173 1,416,845
Recreation 1,035,593 1,172,968 1,321,875
Council 112,498 115,788 150,623
Court 221,174 342,134 358,922
Planning 597,377 779,490 742,541
Media 223,865 269,841 -
Building Safety 793,284 1,032,151 1,496,855
Finance 435,970 465,846 573,042
Workforce Development 186,250 322,000 324,050
Festival on Main 126,250 126,250 140,848
Facility Maintenance 925,250 1,137,789 1,214,642
Safety/Risk Management 5,500 11,650 46,500
Debt Service 2,102,597 1,669,188 2,156,504
Communications, Information & Digital
Solutions (CIDS)
733,357
797,117
1,388,939
General Fund Expenditures 23,550,043 28,706,651 35,019,083
Community Foundation
580,758
697,000
694,000
State Accommodation Tax Indirect 150,000 585,779 1,589,544
State Accommodation Tax Direct 75,000 149,376 249,376
Local Accommodations Tax 1,166,373 1,222,680 1,862,680
Local Hospitality Tax 1,324,902 1,634,297 2,254,297
Investment and DA Fees 4,552,457 8,865,939 9,214,135
Five Year CIP Expense 14,379,702 16,634,653 25,290,142
Total Expenditures 45,779,235 58,496,375 76,173,257
38
39
*See Department Summaries, Goals and Budget Discussions for department specific budget
changes.
CHANGES TO PROPOSED BUDGET
The approved FY25 Budget includes the following changes to the proposed budget:
• The millage rates for FY24 for Jasper and Beaufort Counties were 96 mills and 102 mills
respectively. FY24 is a reassessment year for Beaufort County. The proposed millage rate for
FY25 was 95 mills for Jasper County. For Beaufort County the proposed millage rate was
100.5.
• Council directed staff to prepare a balanced budget with a rollback millage rate of 95 mills for
Jasper County and to reflect the proportionate decrease to the Beaufort County millage.
40
• Positions removed from the budget by Council were the planner 2, plans examiner, media
technician and three fire fighters/paramedics.
• Council reduced the proposed cost of living increase from 5.5% to 4.5%.
• It was decided by Council that the proposed Parks, Recreation and Tourism master plan not be
funded.
BUDGET TRENDS
• Public Safety - Police & Fire Department projected expenditures constitute the largest portion
of General Fund Expenditures, comprising 38.64% of the total.
• As a reflection of the City’s continued growth, the FY25 budget includes $9,150,000 to fund
necessary construction, acquisition, renovation, and expansion of facilities.
• Infrastructure needs included in the FY25 budget include storm drainage projects, and street
projects totaling $13,900,000.
41
MILLAGE
City Council has reduced the millage rate from 136 mills in FY15 to 95 mills for FY25. The
reduction is noted on the ten-year millage rate comparison chart below.
Ten Year Millage Rate Comparison
FY
JASPER
COUNTY
SCHOOL
OPERATIONS
SCHOOL
DEBT
SERVICE
TOWN OF
RIDGELAND
CITY OF
HARDEEVILLE
2016 154 164 25 118.2 130
2017 154 164 25 125.2 123
2018 154 166 25 126.48 120
2019 154 166 25 134.48 117
2020 154 166 25 137.76 114
2021 154 166 25 140.25 114
2022 154 166 25 143.27 112
2023 152 166 25 140 97
2024 152 166 25 151 96
2025 151.8 166 25 157.2 95
Jasper County presented because virtually all of Hardeeville is in Jasper County
FY24 millage rates for City residents in each county are as follows:
Jasper County - 95 mills
Beaufort County - 100.9 mills
* 10 Year Comparison omits School Operations and School Debt Service
42
GENERAL FUND BALANCE
The City’s General Fund balance for the most recent fiscal years along with the projections for
FY24 and FY25 are as follows:
FY25
FY24 Approved
FY22 Actual FY23 Actual Projected Budget
Fund Balances
General Fund Balance
4,465,510
2,861,900
3,168,585
3,168,585
Less ARPA unspent funds 1,624,656 2,385,881 1,996,696 -
2,840,854 476,019 1,171,889 3,168,585
Land Acquisition Fund 1,226,260 1,300,528 2,669,000 1,459,000
Economic Development Fund 293,983 304,637 324,000 340,000
Budget Stabilization 3,058,265 3,467,961 3,996,489 5,325,890
REVENUE PROJECTIONS
City of Hardeeville staff projects revenue based on all available information. Projections are built
analyzing past results (trends) coupled with an assessment of the anticipated impact of growth.
Additionally, the projected impacts, if any, of events occurring in the greater economy (i.e.,
pandemic, supply and demand challenges, etc.) are also considered.
Property taxes are the largest single revenue source for the City. Staff consults with both Jasper
and Beaufort Counties regarding digest data and reviews permitting and home building activity
the City is experiencing.
43
GENERAL FUND REVENUE COMPARISON
Historical revenue trends are represented in the chart below.
FY20 Actual FY21 Actual FY22 Actual FY23 Actual FY24 Projected FY25 Budget
Taxes 6,619,822 7,890,099 9,622,869 11,390,787 11,943,506 11,402,262
Licenses and permits 3,718,492 4,457,031 6,403,760 7,843,262 7,030,000 7,535,050
Intergovernmental 540,961 996,197 1,348,492 2,214,420 873,258 15,144,039
Fees 936,184 1,020,320 1,149,991 1,360,616 1,641,200 8,869,590
Charges for services 44,075 154,967 346,358 289,060 248,500 2,333,948
Investment income 216,895 19,726 38,240 443,998 250,000 1,714,333
Other revenues 799,510 502,105 3,565,208 2,243,456 4,996,489 1,155,200
Total Revenues 12,875,939 15,040,445 22,474,918 25,785,599 26,982,953 48,154,422
• The significant increase in Taxes is the result of the continued growth of the City’s tax base,
particularly residential housing.
• Planning, Building & License increase reflects the ongoing growth in permitting and business
license activity.
• Other revenues (FY24 projected and FY25 Budget) include budget stabilization of $3,996,489
and $5,325,890, respectively. Budget stabilization is the City’s reserve of fund balance for
unanticipated events.
44
OTHER SOURCES OF REVENUE
In addition to the General Fund revenues summarized above, the City has other sources of revenue.
Accommodation and Hospitality tax revenues are legally restricted for expenditures that promote
parks. recreation and tourism within the City. These special revenues are classified as nonmajor
governmental funds.
Other nonmajor special revenue funds include the Fire Fund, Police Fund and Victims’ Assistance
Funds. This revenue is restricted to the functions of the individual funds.
The City receives fees for funding various infrastructure projects and the increased service demands
related to the City’s growth. These fees are paid pursuant to agreements between the City and
developers.
GENERAL FUND EXPENDITURE COMPARISON
Changes in departmental budgets are addressed in the Departmental Summaries that follow. The
departmental expenditures are presented graphically below to provide a visual of where City funds
are spent.
45
46
DEPARTMENTAL SUMMARIES, GOALS AND BUDGET
DISCUSSION
GENERAL GOVERNMENT
The City of Hardeeville's General Government consists of the City Manager, Deputy City
Manager, City Clerk, Deputy City Clerk, Administrative Services Director, CIP Project Manager
and Human Resources Director.
Collectively, the Administration Department works to manage the City's delivery of public
services, direct and oversee the implementation of policy decisions, planning, and fiscal
management. Additionally, the Department provides management of human resources, insurance,
grants, risk management and special projects.
Significant increases in the General Government budget include the increase in budget
stabilization ($1,329,401) to meet the 20% of total expenditure requirement. Also included are
increases in salary and benefit costs and transfers out.
CITY COUNCIL
The City Council budget includes a slight increase in council salaries, effective mid-year, in
anticipation of increased costs for meeting participation.
47
POLICE
It is the mission of the Hardeeville Police Department to consistently provide a level of service
that improves the quality of life for residents and visitors. We recognize our ethical responsibility
and commit ourselves to a high standard of professional accountability. Dignity and respect for all
individuals have provided the foundation for our community policing partnerships. Our mission is
accomplished through collaborative efforts between the police department and the community by
employing proactive policing strategies and problem-solving.
FY25 BUDGET NOTES
The City’s Police Department consistently provides a level of service that improves the quality of
life for the residents and visitors. The Police Department staffing totals 44 positions and includes:
41 sworn officers, 1 Victims Advocate and 2 Records Specialists. Included in the FY25 Budget
are 3 new patrol positions. Most of the Department’s increase relates to salaries, benefits, and
related equipment for four new officers.
GOAL ONE
Recruitment remains a top priority of the Department. The following efforts and steps have been
implemented:
1) Implementing command staff duties to streamline the onboarding process with proper oversight.
2) Utilizing NeoGov to track onboarding and internal processes, including a training sergeant to
oversee new hires.
3) Developing clear policies and procedures to guide the process.
48
GOAL TWO
The South Carolina Law Enforcement Accreditation is a goal of the department, and every effort
has been made to expedite the process. SCLEA is given only after rigorous review of the
Department’s policies, procedures, and activities, assuring commitment to the highest standards of
practice. The process typically takes 3 years.
City of Hardeeville Police Department Accreditation Phases and Progress
Fiscal Year FY24 FY25 Projected FY26 Projected
Application 100%
Self-Assessment 75% 100%
On-Site Assessment 100%
Council Review 100%
Maintain Compliance and
Reaccreditation
100%
GOAL THREE
The department is focused on improving community relations by building trust and legitimacy,
policy and oversight, technology and social media, community policing and crime reduction,
officer training and education, and officer safety and wellness. These are the six pillars of 21st -
century policing. Our initiatives include:
• Building Trust and Legitimacy: Achieving accreditation through best practices to reduce
liability and safeguard the community.
• Policy and Oversight: Implementing policies and procedures that provide a clear path for day-
to-day operations.
• Technology and social media: Utilizing Nixle and Facebook for public information sharing
and nearing completion of a standalone web page for the department.
• Community Policing and Crime Reduction: Continuing programs like Cops with Cones and
National Night Out and launching the first Citizens Police Academy. We will also conduct
annual public surveys to gather feedback and improve.
49
• Officer Training and Education: Budgeting for training and education, implementing virtual
reality training, and providing active shooter training and response plans.
• Officer Safety and Wellness: Enhancing officer safety with new firearms, equipment, and a
break room. Future plans include an on- duty workout schedule, adding officers to distribute
workload, and stress management training.
50
FIRE
The City of Hardeeville Fire Department is dedicated to saving lives and property through
excellence in training, preparedness, professionalism, and community risk reduction.
FY25 BUDGET NOTES
The City of Hardeeville Fire Department is responsible for providing for the safety and security
for its citizens, the community, and neighboring areas to reduce or eliminate loss associated with
fires, emergencies, and disasters.
The Fire Department total run volume exceeds 2,000 calls annually. Rescue and emergency
medical services make up more than three-quarters of the total call volume. The City has four fire
stations and approved staffing of 51 full time paid professional firefighters and 10 part time
paramedics. Budget increases for FY25 include an added administrative position, increased
salaries and related benefits, and supplies for special operations teams.
GOAL ONE
To develop targeted and measurable initiatives internally that set us apart from surrounding Fire
Departments with the intent of enhancing recruitment and reinforcing retention of the best
members.
51
City of Hardeeville Fire Department Quality Assurance Metrics
Fiscal Year FY24 FY25 Projected FY26 Projected
Created stringent testing
process as part of the pre-hire
process
75% 100% 100%
Implemented competency
testing for current employees 50% 100% 100%
Develop Quality Assurance
metrics for performance
(patient surveys) *
10% 50% 100%
Weekly Training Program for
Fire, Technical Rescue and
Medical Disciplines
10% 75% 100%
Implement Training Calendar
for Department leads 0% 50% 100%
*Beginning in FY25 all patients will be given a QR code that will allow them to rate their
experience with their Medic Crew. This data will be gathered over several years and used as the
basis for the HFD quality rating system.
GOAL TWO
In FY24, we began to implement the metrics below to ensure excellence in training; we will
continue to expand training requirements and professional certification in subsequent years.
• Facility training at Bluffton Township Fire District required time performance standards be
met by all line personnel for Rescue Skills, Forcible Entry Skills, Initial Company Fireground
Skills
• ISO Hours Standards for Company Training Hours (192), Officer Hours (12), Driving Hours
(12) and HazMat Hours (6) are completed for all line personnel
• Personnel strive to complete 18 hours of training at a facility as defined by the Fire Suppression
Rating Schedule through MOUs.
• Approximately 25 personnel complete (National Registry Emergency Medical Technician)
NREMT recertification annually.
52
• Established a weekly Training Program to provide direction on training in Fire, Technical
Rescue, and Medical Disciplines.
• Department Lead Training is scheduled for three weeks every month with each session
including one of the three disciplines.
The City of Hardeeville Fire Department is staffed at 49 members, firstly, certified as firefighters.
To ensure mission success and overall excellence in training, it is a priority for members to cross
train in specific areas. Area specialization includes training and certification as Paramedics, South
Carolina Fire Academy Instructors, Dive Team Members, and Rescue Technicians. See below for
specific cross training capabilities.
City of Hardeeville Fire Department Team: Discipline Break Out
Fiscal Year FY24 FY25 Projected FY26 Projected
Firefighters 49 49 *61
Paramedics 12 12 *16
Emergency Medical Technicians 36 36 36
Advanced Emergency Medical
Technician 1 3 7
Officers 20 21 22
Fire Apparatus Operators 12 18 26
Ambulance Operators on the Line 44 44 57
Rescue Technicians 11 15 20
Technical Rescue Team Members 0 5 5
Tactical Paramedics on the Special
Response Team 0 4 5
Dive Team Members 0 12 12
Fire Inspectors 1 2 2
South Carolina Fire Academy
Instructors 8 10 12
Critical Care Paramedics 0 1 3
*Projections include assumption of additional ambulance and Fire House.
53
Minimum Fire Suppression Training Requirements are set by the Insurance Service Office and are
outlined in the Fire Suppression Rating Schedule. ISO also requires driver training, hazmat
training, and officer training as outlined below. The National Registry of Emergency Medical
Technicians dictates the Training Hours required annually. The City of Hardeeville Fire
Department requires SCFA instructors, Rescue Technicians, and Teams Members to meet the
below hours. Other agencies such as OSHA, NFPA, and DHEC require additional training
annually. It is the City’s intent to meet and exceed these requirements each year.
City of Hardeeville Fire Department Current Training Hours (Average per employee)
Fiscal Year FY24 FY25 Projected FY26 Projected
Paramedic Training Hours
*30 hr/yr Minimum 34 48 55
EMT Training Hours
*20 hr/yr Minimum 24 38 48
Advance EMT Training Hours
*25 hr/yr Minimum 29 42 50
Firefighter Company Training
Hours
*192 hr/yr Minimum
200.1
210
220
Facilities Training Hours
*18 hr/yr Minimum 7.3 10 18
Officer Training Hours
*12 hr/yr Minimum 26.5 30 30
Fire Apparatus Driver Training
Hours
*12 hr/yr Minimum
21
25
25
HazMat Training Hours
*6 hr/yr Minimum 6 10 10
Ambulance Driver Training Hours
*0 hr/yr Minimum 3 6 6
Rescue Discipline Training Hours
*40/yr Minimum 11.4 40 40
Technical Rescue Team Member
Training Hours
*100 hr/yr Minimum
27.1
100
100
Tactical Medic Team Member
Training Hours
*100 hr/yr Minimum
29.25
100
100
Dive Team Member Training
Hours
*100 hr/yr Minimum
6
100
100
54
City of Hardeeville Fire Department Training Total Hours New Member
Fiscal Year FY24 FY25 Projected FY26 Projected
Training Hours for
New Paramedics 1,112 (1 member) 1,112 (1 member
attending)
5,560 (send at least 5
members)
Training Hours for
New EMT 320 (1 member) 320 (send 1 member) 1,280 (send 4
members)
Training Hours for
New Firefighter 660 (2 member) 330(1 member) 1320 (4 members)
Advanced EMT 136 (1 member) 408 (send 3 members) 680 (5 members)
Total Training Hours - 11796.38 Hours -- Average per Fire Department – 267.21Hours
GOAL THREE
The Hardeeville Fire Department will continue to expand upon our Advanced Life Support
protocols and capabilities to provide a higher level of service than typically found in this
region. This is accomplished through a solid working relationship with our Medical Control
Physician, planned acquisition and training for Rapid Sequence Intubation, Point of Care Ultra -
sound, and a consistent commitment to implementing Evidence Based Medicine.
• FY25 intends to procure the Point of Care Ultrasound dramatically increasing diagnostic
capabilities in critical patients.
• FY26 will train for the ability to administer blood or blood products in critical situations
GOAL FOUR
The Municipal Emergency Operation Center was opened to emergent and non-emergent situations
in FY24 and critical situations occurred that year to vet the robust capability of the MEOC. During
an active shooter situation, two tactical medics were on the scene within minutes. During a storm
microburst, calls were handled quickly, efficiently and with no injuries to personnel.
• FY25 increased capabilities and services are planned to include the addition of Resue
divers (the only in our area) and personnel trained by the Regional USAR team.
• FY26 continues to enhance capacity to become a true “All Hazards” Fire Department to
include Special Operations and aggressive medical capabilities.
55
PUBLIC WORKS
The mission of Public Works is to deliver reliable and sustainable public infrastructure and services
that ensure the health, safety, and well-being of our community. We are dedicated to maintaining
and improving our roads, water systems, and public spaces through innovation, collaboration, and
responsible stewardship of resources.
FY25 BUDGET NOTES
The City of Hardeeville Public Works Department provides management, maintenance, and repair
services for infrastructure within the City and for City vehicles, equipment, and facilities. Regular
services include right-of-way mowing and trimming, maintenance and repair of the City’s storm
drainage system, management and maintenance of public buildings, maintenance of parks and
public open space, and management of City fleet vehicles and heavy equipment.
Public Works also has responsibility for logistics, setup and take down of special events, festivals,
and celebrations. The Public Works Department consists of 11 staff including the Public Works
Director, Operations Manager, Maintenance Supervisor and 8 Maintenance Technicians. The
Public Works Director works to implement various capital improvement projects assisting each of
the City's Departments with various budgeting, design, construction, and project management as
these projects are developed.
Public Works will continue to increase the level and quality of maintenance and inspection of the
City’s stormwater system. The FY25 budget allows funding for one additional employee and
increases in overall benefit costs.
GOAL ONE
Establish a set of policies and procedures to standardize Public Works’ operations while enhancing
efficiencies across all service and support lines of action.
56
• Within three months, identify gaps and assign development and rewrites of policies and
procedures to division managers.
• By end of FY, drafts of new policies and procedures or rewrites of existing policies and
procedures routed through the department for comments and edits. Routed to the department
director for approval.
• Within FY26, a complete library of all public works policies and procedures is in place and
ready for use by all department personnel.
City of Hardeeville Public Works Operations Standardization Progress
Fiscal Year FY24 FY25 Projected FY26 Projected
% of Standardized
Procedures and
Policies
10% 80% 100%
GOAL TWO
Develop and implement a facility condition index (FCI) to track and monitor the physical condition
of city-owned facilities, allowing for well-informed, data-driven funding decisions.
• Within three months, establish a system (i.e. excel spreadsheet) to track, monitor, and update
facility condition information and assess the physical condition of all systems which make up
the facility. Utilize the already existing facility condition assessment conducted by MPS in
2023 as the baseline
• By end of FY25, develop preventive maintenance schedule for all city- owned facilities, to
include all facility systems
• Within FY26, have necessary data to begin assigning an FCI to each city-owned facility
City of Hardeeville Public Works Operations Standardization Progress
Fiscal Year FY24 FY25 Projected FY26 Projected
% of City Property
Assigned a FCI 5% 65% 100%
57
GOAL THREE
Implement cross training program designed to encourage pursuit of new skills and knowledge
which will enhance Public Works’ service and support to other city departments and city residents
alike.
• Within three months, identify and make opportunities available for department personnel to
cross train and learn to safely operate all public works vehicles and equipment. Establish a
tracking system to monitor cross training progress.
• By end of FY25, at least 75% of public works staff are cross trained and competent in safely
operating one additional piece of equipment or operating a vehicle different than that used for
their individual day-to-day workload.
• Within FY26, all personnel have cross trained, and at least one additional team member has
achieved the Commercial Driver’s License (CDL) certification, enhancing public works’
capability and capacity for heavy equipment operations.
City of Hardeeville Public Works Operations Standardization Progress
Fiscal Year FY24 FY25 Projected FY26 Projected
% of Cross Trained
Employees 5% 75% 100%
58
PARKS, RECREATION AND TOURISM DEPARTMENT
The Parks, Recreation and Tourism (PRT) Department manages various facilities, programs, and
activities providing recreational opportunities for Hardeeville residents and visitors. Through
utilization of its parks, open spaces, facilities, programs, and cultural resources, PRT promotes
opportunities that make Hardeeville a more desirable place to live, work and play. Responsibilities
of the Department include establishing and managing facilities, parks, festivals, special events,
athletics, and programming for all ages while delivering the four pillars of CARE:
• Creating economic impacts
• Advancing conservation
• Rejuvenating health and wellness
• Enhancing quality of life
The PRT Department staffing consists of five full time staff: the PRT Director, the Programs and
Events Manager, and the Recreation Center Manager. Additionally, the Recreation Center is
staffed with seven part time Recreation Center Guest Specialists.
FY25 BUDGET NOTES
PRT is responsible for providing the community with events such as the Hardeeville Festival on
Main and Fourth off Main. The increase in staff costs, supplies and services account for most of
the PRT budget increase.
GOAL ONE
Expand onsite events and use of the facilities, including; Sports Tourism Opportunities by 10%;
Field rentals by 40% and Rec Center rentals by 25%; and class offers and revenue by 30%.
59
City of Hardeeville Parks, Recreation and Tourism Department
Fiscal Year FY24 FY25 Projected FY26 Projected
Tournaments 10 11 12
Field Rental
Revenues $38,870 $54,418 $70,743
Rec Center Rentals $39,532 $49,000 $54,000
Classes $7,200 $9,000 $12,000
GOAL TWO
In cooperation with the planning department, PRT plans enhancements and expansions to existing
community structures such as the JuJu Hudson park and the Richard Grey Sports complex. These
enhancements include additional parking, and the construction of a 10-mile walking trail.
City of Hardeeville Parks, Recreation and Tourism Department Capital Improvements
Fiscal Year FY24 FY25 Projected FY26 Projected
Finalize JuJu Hudson
Park Enhancements
Secured budget
approval
Issue ITB for project-
will award and begin
work
Expectation that
enhancements will be
complete
Richard Gray Master
Plan
Identify and budget
projects
Issue ITB for
additional parking
Parking Expansion
complete
10 Mile Nature Trail
Initiate Ideas
Identify details and
discuss trail rights of
land use with
stakeholders
Present plan for
budget appropriation
GOAL THREE
Continue to add programing, events and athletic offerings to the community. PRT will continue
to grow, both in number and attendance, of special events; add additional programs, classes and
sports offerings for youth athletics
60
MUNICIPAL COURT
The court treats all citizens equally, impartially and fairly in accordance to South Carolina Code
of Laws, the administrative authority given by South Carolina Court Administration and the City
of Hardeeville. It is to also be efficient and to continue enhancing its operational performance.
FY25 BUDGET NOTES
The Municipal Court is a branch of South Carolina Court Administration and serves as the judicial
system for the City of Hardeeville. This court handles traffic and criminal misdemeanor violations
as well as City ordinances. Municipal Court staff consists of the Municipal Court Judge, 2 Court
Clerks and 2 part time bailiffs. The Court’s FY25 budget increase reflects salary and benefit cost
increases.
GOAL ONE
Treat all people equally and fairly, in accordance with the SC Code of Laws and administrative
authority given by South Carolina Court Administration and the City of Hardeeville.
GOAL TWO
Efficiently dispose of all cases in a timely manner as to keep in line with the Rules and Regulations
set by the South Carolina Court Administration.
GOAL THREE
Keep accurate records of tickets and/or warrants entry and public funds collected.
61
PLANNING
Hardeeville has, and is set to continue to grow rapidly, necessitating that people embrace a true
vision for the City which respects the natural environment and traditional lifestyles, allows for
responsible growth and quality development with an emphasis on regional cooperation. The
Hardeeville Comprehensive Plan and Municipal Zoning and Development Ordinance (MZDO)
support these economic activities and quality growth, coordination and cooperation among our
neighbors must occur resulting in improved service delivery, high quality development, and unity.
The Planning Department must implement these documents to move our community forward. This
healthy vibrant community must look to the past, consider the present, and plan for the future in
order to remain a superior place to live, work, and play. Hardeeville … our future awaits.
FY25 BUDGET NOTES
The mission of the Planning Department is to promote managed growth in the City of Hardeeville
by maintaining a comprehensive planning program. This is accomplished by maximizing zoning
and permitting, coordinating the provision of public services, and striving to optimize the quality
of life for all City residents while maintaining full compliance with City codes and ordinances.
Planning staff is comprised of the Planning Director, Planning Manager, 2 Planners, Planning
Technician, Permit Technician and a Code Enforcement Technician.
For FY25, engineering cost increases are offset by decreases in salaries netting a reduction in the
Planning Departments budget. Additional engineering costs will facilitate refinement of the
MZDO (Municipal Zoning and Development Ordinance) update.
GOAL ONE
Incorporate growth management techniques and sustainable development principles into public
policy and development review requirements.
62
• FY24 The City adopted MZDO which contains Transect Zones for the Downtown Districts
to aid in developing and creating a pedestrian-friendly, business-friendly atmosphere.
• FY25 will bring continued redevelopment and revisions.
• FY26 visual impacts of change and development will be evident throughout the city.
GOAL TWO
Encourage attainable housing as part of a broad plan that aims to increase housing choice. Plans
include providing information for residential housing pipelines and to ensure it is updated monthly
to all media sources.
City of Hardeeville Planning Department Affordable Housing Plan Implementation
Fiscal Year FY24 FY25 Projected FY26 Projected
Housing Pipeline
Information
Distribution Progress
Internal to planning
commission and
council.
Internal to planning
commission and
council.
Published through
Hardeeville Media
Department
GOAL THREE
Transform Whyte Hardee Boulevard and Main Street into complete streets via the execution of the
Whyte Hardee Blvd Master Plan by committing resources to installing a landscape median,
crosswalks, street trees and shared accesses.
• In FY24 the MZDO was adopted and studies on traffic and the intersection were performed.
• In FY25, the City will formalize a private partnership for the benefit of the community, and
implementation of the standards plan will commence.
• Redevelopment will continue through FY26, with the support of established Public -Private
Partnerships.
63
COMMUNICATION, INFORMATION AND DIGITAL SERVICES
At the heart of Hardeeville's diverse community lies our commitment to connectivity,
transparency, and shared narratives. Our mission is to weave the rich tapestry of Hardeeville's
story, ensuring it resonates with every resident and visitor alike. With a relentless pursuit of
technological advancements, we strive to deliver timely and relevant information that empowers
our community. By harnessing the power of digital media, we will spotlight the unique
experiences, achievements, and aspirations that define Hardeeville. Our pledge is to cultiv ate a
digital landscape that not only informs but inspires, fostering a sense of pride and shared identity.
Together, let us embrace the future, connect through cutting-edge communication, and illuminate
the essence of Hardeeville for all to see. Through innovative digital platforms, we aim to foster an
inclusive dialogue, promoting civic engagement and unity.
FY25 BUDGET NOTES
In FY24, IT, Communications and Digital Solutions were consolidated into a single department
consisting of 5 employees; the CIDS Director, Media Coordinator, Digital Communications
Coordinator, Digital Content Coordinator, and IT Coordinator. The FY25 budget includes
provisions for adding a Network Technician, part -time Media Tech and covering the increased
costs of software licensing.
GOAL ONE
Enhance collaboration across the Department through digital solutions to inform and engage
internal and external audiences. Enhance communications platforms to allow for easier access to
published information. Develop a cyclical newsletter to be distributed by print and digital solutions.
GOAL TWO
Improve City television services with additional programs, interviews, and events.
64
City of Hardeeville CIDS Department Television Services
Fiscal Year FY24 FY25 Projected FY26 Projected
Special interest
content 4 22 28
Sporting event
content 0 8 24
Shop Local 4 12 24
GOAL THREE
Incorporate language translation into website/social media/ printed documents and in - person
meetings
City of Hardeeville CIDS Department Multi-Language Integration Across Variety of
Media
Fiscal Year FY24 FY25 Projected FY26 Projected
Website translation 10% 95% 100%
Job Postings 36 50 50
Multi-lingual kiosks 0 5 5
65
BUILDING
The Department of Building Safety has a primary mission to provide a public safety service to the
community that is efficient, knowledgeable, and helpful. The overall intention is to safeguard life,
health, property, and public welfare through the administration and enforcement of the
comprehensive building codes from the state of South Carolina.
FY25 BUDGET NOTES
The Department reviews projects, ensures code compliance, conducts inspections and issues
permits on existing properties and new building projects. The Department is staffed by the
Building Official, Deputy Building Official, Plans Examiner, 6 full -time Building Inspectors and
one part-time Building Inspector.
The FY25 increase in the Department’s budget reflects the expectation of full staffing, the addition
of one full-time inspector, cost increases for employee benefits and the use of 3rd party inspection
services.
GOAL ONE
Exceed standards in our community by providing code compliant residential and commercial
structures to protect the safety, health, and financial investment of the citizens and businesses of
the City.
City of Hardeeville Building Department
Fiscal Year FY24 FY25 Projected FY26 Projected
# of Permits 2,054 2,350 2,652
# of Inspections 30,000 44,424 55,530
GOAL TWO
Provide efficient, transparent, and reliable plan review, inspection and building services by
obtaining a state -of-the-art software program that will provide real time updates on permits and
projects throughout the city.
66
GOAL THREE
Develop effective strategies to increase efficiency, communication and accountability from both
the building staff and the construction community for the increased quality of life for all residents
in Hardeeville.
• On site meeting, 1 per month, which each development.
• Exploring virtual inspection options to increase efficiency and timeliness.
67
FINANCE
The Finance Department is committed to providing timely, accurate, and complete information to
City Council, the City Manager and staff to facilitate decision making. Primary objectives of the
department are the preparation of the budget and the annual audit. The department provides clear
and easily understandable information to city residents. To that end, the City produces an Annual
Comprehensive Financial Report (ACFR), the Popular Annual Financial Report (PAFR) as well
as the budget book. The ACFR document includes the annual audit and narrative and supplemental
schedules.
FY25 BUDGET NOTES
The Finance Department FY 25 budget reflects the addition of one full-time Financial Analyst and
cost increases related to salaries and benefits.
GOAL ONE
Improve procurement support to departments Citywide.
• Improve staff understanding of procurement workflow upon the addition of new department
staff person responsible for standardizing the City’s process for procurement, including RFP,
RFQ, RFI and other bid opportunities.
City of Hardeeville Procurement Standardization Progress
Fiscal Year FY24 FY25 Projected FY26 Projected
Group Training Sessions 0 2 4
Total Group Training
Attendees 0 10 20
Number of One-on-One
Procurement Advisement
Meetings
0 10 8
Total One-on-One Attendees 0 14 10
68
GOAL TWO
Provide and improve financial transparency.
• Continue to evolve financial reporting and continue to earn the GFOA’s Triple Crown awards.
o The Certificate of Achievement for Excellence in Financial Reporting
o The Distinguished Budget Presentation Award
o The Popular Annual Financial Reporting (PAFR) Award
• Increase the readability and visual appeal of the ACFR and the budget document through
increased use of photos, charts and graphs.
• Address fully the recommendations and comments in the GFOA reviews.
Annual Budget Visuals
Fiscal Year FY24 FY25 Projected FY26 Projected
Pictures 142 150 160
Charts 3 10 20
Graphs 1 10 20
GOAL THREE
Improve processing efficiencies in all aspects of the Finance department.
• Pursue a financial ERP system. Request for Proposals for this financial enterprise solution will
be published in FY25 with projected system implementation in FY26.
• Increase the number of vendors payments processed through ACH.
• Increase the number of automated processes and approvals.
69
WORKFORCE DEVELOPMENT
The program works to serve residents of Jasper and Beaufort County, who feel as they don’t have
a chance to make it in the real world, providing them opportunity to advance their careers through
the availability of new training and additional resources.
FY25 BUDGET NOTES
The City’s Workforce Development Program will continue to provide training in welding and
commercial driver’s license (CDL). The FY25 budget anticipates doubling the number of CDL
students from 15 to 30, and maintaining the number of welding students at 20.
The program has no employees and is overseen by the Assistant City Manager.
GOALS:
• Create and launch one industry-specific training program within the next 12 months.
• Achieve a 10% increase in enrollment and a 90% completion rate within 18 months
• Secure employment for 60% of program graduates within 6 months of completion
• Implement a robust evaluation system to measure program impact and achieve a 85%
satisfaction rate among participants
• Establish formal partnerships with at least 10 local businesses and organizations within 12
months.
70
SAFETY AND RISK MANAGEMENT
The City of Hardeeville has a moral and legal duty to protect its citizens, employees, assets, and
customers. In efforts to complete this process, the city will endeavor to provide a work
environment free of potential and recognizable hazards and safety concerns along with promoting
an environment of health and wellness.
FY25 BUDGET NOTES
This Department has no employees and is overseen by the Administrative Services Director. A
slight increase in operating costs is anticipated in FY25.
GOALS:
• Reduce workplace incidents by 30% within the next 12 months
• Improve claims processing efficiency by 25% and reduce reporting time by 25% within 12
months
• Establish a comprehensive risk management strategy that limits annual loss exposure to less
than 1% of the city's budget within 18 months.
• Achieve 80% participation in safety and health training across all departments within the next
12 months.
• Implement a recognition and rewards program within 6 months, achieving 90% employee
awareness.
• Achieve a 50% increase in employee participation in safety training programs within 6 months
• Increase participation in health and wellness programs by 40% within 12 months.
• Conduct 2 major team-building safety events annually with at least 60% team participation
71
FACILITY MAINTENANCE
Facility Maintenance is responsible for the maintenance and utilities for all City buildings. The
Department has no employees and is overseen by the Public Works Director.
The FY25 budget anticipates higher utility costs and use of outside services.
DEBT SERVICE
Principal and Interest payments on City Debt are accounted for in this Department. Debt Service
has no employees and is overseen by the Finance Director.
The City utilizes various funding sources to achieve these outcomes including voluntary developer
agreement fees, grants, and loans. The largest project in its history, the Recreation Center opened
in early FY22, and was funded with Accommodation (ATAX) and Hospitality Taxes (HTAX) and
developer funds. Additional projects include improvements to Hardeeville Commerce Park and
Improvement to the Exit 8 and US 278 Corridor Area Phase I with total project cost of
approximately $15 million.
The City incurs debt service responsibilities for the purchase, construction, and renovation of
infrastructure, rolling stock, Additionally, the City is also working to obtain funding for the new I-
95 Exit 3 project, an $85 million project that the City is developing in partnership with Jasper
County, the State of South Carolina and private developers.
FESTIVAL ON MAIN
The City captures the cost of its largest event, Festival on Main, in a separate cost center. Changes
between FY25 and FY24 are primarily due to anticipated cost increases for additional staffing as
the event becomes larger.
72
PERSONNEL SUMMARY
The City adjusts staffing levels as necessary to ensure the increased demand for services is met.
Since 2018, the City's FTE have increased from ninety-four to one hundred fifty-four and one half.
Staffing changes over the last five years are indicated in the chart below.
FY21 FY22 FY23 FY24
FY25
Budget
General Government 5 7 7 7 7
Planning/Development Services 4 3 4 5 5
Downtown Development 3 3 - - 0
Media 3 3 3 3 0
Fire Department 34 40 49 54 57
Police Department 30 33 38 44 47
Courts 2.5 3 3.5 4 4
Public Works 11 12 11 11 13
Parks and Recreation 7.5 8.5 8.5 8.5 9.5
Building Inspection 6.5 7.5 10 11 12
Communication, Information &
Digital Solutions 1 1 2 2 6
Finance 3 4 5 5 6
110.5 125 141 154.5 166.5
The FY25 budget adds 13 full-time equivalents (FTE) to City staff. These additions include:
• Police Department – 3 Patrol Officers.
• Fire Department – 4 Part Time Paramedics and 1 Records Specialist
• Building Inspection - 1 Building Inspector
• Planning & Development Department – 1 Planner
• Public Works – 2 Maintenance Technicians
• Parks and Recreation – 1 Rec Complex Supervisor
• CIDS – 1 Network Technician
• Finance – 1 Financial Analyst
73
CAPITAL IMPROVEMENT PLAN
With the goal of providing a competent, comprehensive project assessment, Department Heads
were challenged to develop a five-year Capital Improvement Plan (CIP)rather than consider only
immediate, upcoming year needs. The plan that follows provides approved CIP items for FY25 as
well as a snapshot of anticipated future needs.
The Capital Improvement Plan is provided on the pages that follow.
FY25
Capital Improvement Plan
Summary
74
75
5)41"(&*/5&/5*0/"--:-&'5#-"/,
Project
No. Project Name FY25 FY26 FY27 FY28 FY29 FY30+ Total
City Mgr
Recommended
GG01 Exec Admin Vehicle 70,000 70,000
GG02 Municipal Hub 1,900,000 1,900,000 2,035,000 1,565,000 914,000 1,052,000 9,366,000 1,900,000
GG03 City Hall Expansion 1,000,000 4,770,000 4,770,000 -
-
-
10,540,000 1,000,000
GG04 Argent Blvd-Short Cut Road 5,500,000 -
-
-
-
-
5,500,000 5,500,000
GG05 Argent Blvd @ East Argent Pkwy 1,500,000 -
-
-
-
-
1,500,000 1,500,000
GG06 102 Main Street Renovation & Parking 380,000 1,324,200 350,500 -
-
-
2,054,700 380,000
GG07 Old City Hall - Renovation 900,000 865,000 -
-
-
-
1,765,000 900,000
GG08 Left Turn Lanes US278 1,100,000 -
-
-
-
-
1,100,000 1,100,000
GG09 Exit 8 Sewer 2,108,690 2,108,690 2,108,690 -
-
-
6,326,070 2,108,690
PD01 Equipment Trailer 16,453 -
-
-
-
-
16,453
PD02 Training Facility @ Location TBD 250,000 - - - - - 250,000 250,000
PD03 Hardeeville Police Dept 3,768,800 22,868,250 603,000 -
-
-
27,240,050
PD04 Police Fleet 873,900 -
-
-
-
-
873,900
PD05 Axon Safety Plan 271,670 271,670 271,670 271,670 271,670 -
1,358,350 271,670
PD06 Citywide Cameras 95,906 92,906 92,906 92,906 92,906 92,906 560,436 95,906
PD07 Entry Team Kits 35,200 -
-
-
-
-
35,200
PD08 Covert Pole Camera 7,500 -
-
-
-
-
7,500
FD01 EOC Storm Upgrades 120,000 -
-
-
-
-
120,000 120,000
FD02 Rescue Watercraft 50,000 -
-
-
-
-
50,000
FD03 UTV for emergency response 70,000 -
-
-
-
-
70,000
FD04 Ambulance Program 450,000 - 450,000 - 450,000 - 1,350,000
FD05
Opticom 105,000 -
- -
- - 105,000 105,000
FD06 Vehicle Replacement 165,000 -
- -
- -
165,000
FD07 Fire Station 85 & PD substation 1,655,950 5,600,225 188,000 -
- -
7,444,175
FD08 Fire Station 86 & PD substation 2,155,950 5,600,225 188,000 -
- -
7,944,175
FD09 Truck 83 Refurb 250,000 -
-
-
- -
250,000
FD10 Station 82 New Build 4,700,000 -
-
-
- -
4,700,000 4,700,000
FD11 Radio Replacement 210,000 210,000 210,000 -
- -
630,000
FD12 Axon Cameras 41,250 41,250 41,250 41,250 41,250 -
206,250 41,250
PW01 PWD Bay 2 Renovation 154,440 -
-
-
-
-
154,440 154,440
PW02 City Hall Roof Replacement 115,020 -
-
-
-
-
115,020 115,020
PW03 FS 83 Drainage and Bldg Paint 194,100 -
-
-
-
-
194,100
76
Project
No. Project Name FY25 FY26 FY27 FY28 FY29 FY30+ Total
City Mgr
Recommended
PW04 Generator Install Var Fac 241,600 - - - - - 241,600 241,600
PW05 Excavator 215,000 -
-
-
-
-
215,000
PW06 2 Additional PW Vehicles 102,800 -
-
-
-
-
102,800 51,400
PW07 New Software Suite 133,615 -
-
-
-
-
133,615
PRT01 JuJu Playground Phase 2 1,097,000 -
-
-
-
-
1,097,000 1,097,000
PRT02 JuJu Phase 3 Parking Lots (2) 357,000 1,350,700 -
-
-
-
1,707,700 357,000
PRT03 Richard Gray Rec Plex MP Improvements 60,000 750,000 750,000 1,000,000 6,000,000 6,000,000 14,560,000 -
PRT04 Alta Bike Ped Trailways -
-
-
-
-
4,821,000 4,821,000 -
PRT05 PRT Master Plan (Comprehensive/ longrange strategy) -
250,000 -
-
-
- 250,000 -
PRT06 Rec Center Parking Lot additon 400,000 -
-
-
-
-
400,000 400,000
PRT07 Traffic Calming Jim Hatter Way -
15,000 15,000 - - - 30,000 -
PRT08
Richard Gray Complex basketball parking & sidewalk 492,000 492,000 -
-
-
-
984,000 492,000
PRT09 EA 1330 Conservation Park -
85,000 85,000 -
-
19,830,000 20,000,000 -
PRT10
Randall Street Parking Lot (old church site) 364,000 614,000 -
-
-
-
978,000 364,000
PRT11 Sewage Complex Pump Station -
-
-
200,000 -
-
200,000
-
-
-
-
-
-
-
-
PLN01
Whyte Hardee Blvd MP Implementation 125,000 150,000 200,000 250,000 300,000 -
1,025,000 125,000
PLN02 New Softare Suite 75,183 -
-
-
-
-
75,183
PLN03 Comprehensive Plan Update 125,000 -
-
-
-
-
125,000 100,000
BS01 1 Additional BS Vehicle 51,400 -
-
-
-
-
51,400
CIDS01 Recreation Cameras 89,000 -
-
-
-
-
89,000 -
CIDS02
Digital Wall 94,238 -
-
-
-
-
94,238 94,238
CIDS03 Multi Lingual Kiosks 19,889 -
-
-
-
-
19,889 19,889
CIDS04 Outdoor Signage 100,000 100,000 -
-
-
-
200,000 -
CIDS05
Digital Documentation / Storage 120,000 -
-
-
-
-
120,000 -
-
**
Citywide Vehicle Replacement $975,100 924,000
34,477,554 49,459,116 12,359,016 3,420,826 8,069,826 31,795,906 139,582,244 24,508,103
** Three replacement PD vehicles and three new PD vehicles $97,100 each, $582,600 total. One replacement SUV for FD $75,000, one truck for new
Bldg Safety staff $51,400 and new excavator for PW $215,000.
77
Project
No. Project Name FY25
City Mgr
Recommended
GENERAL
FUND
USE OF
GENERAL
FUND BAL GRANTS DA FEES
THIRD
PARTY
FUNDING ARPA
DEBT
ISSUANCE
LAND
ACQUISITION HTAX ATAX TOTAL
CM RECOMMENDED
GG01 Exec Admin Vehicle 70,000 -
GG02 Municipal Hub 1,900,000 1,900,000 1,900,000 1,900,000
GG03 City Hall Expansion 1,000,000 1,000,000 1,000,000 1,000,000
GG04 Argent Blvd-Short Cut Road 5,500,000 5,500,000 3,650,000 1,850,000 5,500,000
GG05 Argent Blvd @ East Argent Pkwy 1,500,000 1,500,000 1,500,000 1,500,000
GG06 102 Main Street Renovation & Parking 380,000 380,000 380,000 380,000
GG07 Old City Hall - Renovation 900,000 900,000 900,000 900,000
GG08 Left Turn Lanes US278 1,100,000 1,100,000 1,100,000 1,100,000
GG09 Exit 8 Sewer 2,108,690 2,108,690 1,696,333 412,357 2,108,690
-
PD01 Equipment Trailer 16,453 -
PD02 Training Facility @ Location TBD 250,000 250,000 250,000 250,000
PD03 Hardeeville Police Dept 3,768,800 -
PD04 Police Fleet 873,900 -
PD05 Axon Safety Plan 271,670 271,670 271,670 271,670
PD06 Citywide Cameras 95,906 95,906 95,906 95,906
PD07 Entry Team Kits 35,200
PD08
Covert Pole Camera 7,500
-
FD01 EOC Storm Upgrades 120,000 120,000 120,000 120,000
FD02 Rescue Watercraft 50,000 -
FD03 UTV for emergency response 70,000 -
FD04 Ambulance Program 450,000 -
FD05 Opticom 105,000 105,000 105,000 105,000
FD06 Vehicle Replacement 165,000 -
FD07 Fire Station 85 & PD substation 1,655,950 -
FD08 Fire Station 86 & PD substation 2,155,950 -
FD09 Truck 83 Refurb 250,000 -
FD10 Station 82 New Build 4,700,000 4,700,000 3,050,000 1,650,000 4,700,000
FD11 Radio Replacement 210,000
FD12 Axon Cameras 41,250 41,250 41,250 41,250
PW01 PWD Bay 2 Renovation 154,440 154,440 154,440 154,440
PW02 City Hall Roof Replacement 115,020 115,020 115,020 115,020
PW03 FS 83 Drainage and Bldg Paint 194,100 -
78
Project
No. Project Name FY25
City Mgr
Recommended
GENERAL
FUND
USE OF
GENERAL
FUND BAL GRANTS DA FEES
THIRD
PARTY
FUNDING ARPA
DEBT
ISSUANCE
LAND
ACQUISITION HTAX ATAX TOTAL
CM RECOMMENDED
PW04 Generator Install Var Fac 241,600 241,600 241,600 241,600
PW05 Excavator 215,000 -
PW06 2 Additional PW Vehicles 102,800 51,400 51,400 51,400
PW07 New Software Suite 133,615
-
PRT01 JuJu Playground Phase 2 1,097,000 1,097,000 635,000 462,000 1,097,000
PRT02 JuJu Phase 3 Parking Lots (2) 357,000 357,000 15,000 342,000 357,000
PRT03 Richard Gray Rec Plex MP Improvements 60,000 - -
PRT04 Alta Bike Ped Trailways - - -
PRT05 PRT Master Plan (Comprehensive/ longrange strategy) - - -
PRT06 Rec Center Parking Lot additon 400,000 400,000 100,000 300,000 400,000
PRT07 Traffic Calming Jim Hatter Way - - -
PRT08 Richard Gray Complex basketball parking & sidewalk 492,000 492,000 300,000 192,000 492,000
PRT09 EA 1330 Conservation Park - - -
PRT10 Randall Street Parking Lot (old church site) 364,000 364,000 - 364,000 - - - 364,000
PRT11 Sewage Complex Pump Station - -
- - -
PLN01 Whyte Hardee Blvd MP Implementation 125,000 125,000 25,000 100,000 125,000
PLN02 New Softare Suite 75,183
PLN03 Comprehensive Plan Update 125,000 100,000 100,000 100,000
BS01 1 Additional BS Vehicle 51,400 -
CIDS01 Recreation Cameras 89,000 - -
CIDS02 Digital Wall 94,238 94,238 94,238 94,238
CIDS03 Multi Lingual Kiosks 19,889 19,889 19,889 19,889
CIDS04 Outdoor Signage 100,000 - -
CIDS05 Digital Documentation / Storage 120,000 - -
- -
** Citywide Vehicle Replacement $975,100 924,000 924,000 924,000
34,477,554 24,508,103 1,650,187 - 1,696,333 7,614,226 2,262,357 1,215,000 6,874,000 1,900,000 534,000 762,000 24,508,103
** Three replacement PD vehicles and three new PD vehicles $97,100 each, $582,600 total. One replacement SUV for FD $75,000, one truck for new
Bldg Safety staff $51,400 and new excavator for PW $215,000.
79
FY25
Capital Improvement Plan
Proposed Project Descriptions
80
81
5)41"(&*/5&/5*0/"--:-&'5#-"/,
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Exec Admin Vehicle Project Number: GG01
Department: Administration Responsible Staff: Czymbor
Location/address: 205 Main Street Priority: Medium
Project Type: New SUV Reason: Travel vehicle for Adminstrative staff
Lifespan/ Useful Life: 8 yrs. Total Project Cost Estimate: $ 70,000
Description/Justification:The Exec Admin team often travels in groups of 4 or more. Staff are often required to use our persona l
vehicles due to the Ford Escape fleet vehicle being used by the Clerk and others daily. This vehicle needs to be a full sized S UV for
comfort. This vehicle can also be used by the Mayor and City Council when traveling in groups.
82
Project Name: Exec Admin Vehicle Project Number: GG01
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 70,000 70,000
American Rescue Plan Funds -
Grants -
Other -
Other -
70,000 - - - - - 70,000
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset 70,000 70,000
70,000 - - - - - 70,000
83
Project Name: Exec Admin Vehicle Project Number: GG01
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $ -
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
TOTAL CONSTRUCTION BUDGET $ -
Gross SF (includes stairwells, hallways etc.)
Assignable SF
84
Project Name: Exec Admin Vehicle Project Number: GG01
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 7% 0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset Estimated Cost Quantity Estimated Cost
Full sized SUV 70,000 1 70,000
0
000
TOTAL PURCHASED ASSET $ 70,000
85
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Municipal Hub
Department: General Government
Location/address: Martin/main street Downtown area
Project Type: Complete Redesign of existing assets
Lifespan/ Useful Life: 40 years
Project Number: GG02
Responsible Staff: Matt Davis
Priority: High
Reason: Growth & development
Estimate: $
9,366,000
Description/Justification: Create a municipal complex featuring City-owned buildings and public park space that is cohesive and will ultimately
connect with a revitalized Whyte Hardee Boulevard. This is a plan ned improvement spurred by the interest in developing a Veteran s Park as the
first phase. The project will be a multi-year endeavor. Design work has progressed in FY24 for the Veterans Park and construction on that
component should begin in FY25 and will include all site and utility work. Additional design work should occur in FY25 for the rest of the
Municipal Hub and hopefully include a partnership with a private developer for adjacent properties located along Whyte Hardee Boulevard.
$224,000 was spent on Design in FY24.
86
Project Name: Municipal Hub Project Number: GG02
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Veteran's Park Veteran's Park Event Park Event Park Linear Playground Martin Street
General Fund -
Developer Agreement Fees -
Debt Issuance 1,900,000 1,900,000 2,035,000 1,565,000 914,000 1,052,000 9,366,000
American Rescue Plan Funds -
Grants -
Other -
Other -
1,900,000 1,900,000 2,035,000 1,565,000 914,000 1,052,000 9,366,000
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Land Acquistion -
Design 100,000 470,000 120,000 138,000 828,000
Construction 1,900,000 1,800,000 1,565,000 1,565,000 794,000 914,000 8,538,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
1,900,000 1,900,000 2,035,000 1,565,000 914,000 1,052,000 9,366,000
87
Project Name: Municipal Hub Project Number: GG02
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
00 :
00 0
00 0
0
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface 00
Architecture 0 0 300,000
Engineering (MEP) 0 0
Permitting 0 0
TOTAL DESIGN BUDGET $ 300,000
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
Construction Administration
Landscape Budget
00
00
0 0 7,950,020
00
00
00
00
00
TOTAL CONSTRUCTION BUDGET $ 7,950,020
Gross SF (includes stairwells, hallways etc.)
Assignable SF
88
Project Name: Municipal Hub Project Number: GG02
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
00 $ -
00
00
00
00
00
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
00 $ -
00
00
00
00 $ -
00 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset Estimated Cost Quantity
Estimated
Cost
00 0
00 0
00 0
TOTAL PURCHASED ASSET $-
89
Capital Improvements Budget Analysis Worksheet FY24 Budget
Project Name: City Hall Expansion
Department: General Government
Location/address: 205 Main Street
Project Number: GG03
Responsible Staff: Matt Davis
Priority:
& Build a new Annex
Lifespan/ Useful Life: 40 years
&
Bi l d
AProject Type: Renovate existing CH Bldg
Reason:
Estimate: $
10,540,000
Description/Justification: Design and build City Hall renovation and expansion. The current City Hall is at capacity.
Occupancy code requirements require additional sq ft inorder to continue to accommodate new staff. A new building
or annex to City Hall will allow for additional office space and permanently dedicated space for the Media Dept. A
space needs study with recommenations will be completed in FY24. Renovations to the existing building will also be
necessary to maximize meeting space. The new building is projected to be approx 14,400 sq. ft. $300,000 will be spent
on the space study in FY24.
90
Project Name: City Hall Expansion Project Number: GG03
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 1,000,000 4,770,000 4,770,000 10,540,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
1,000,000 4,770,000 4,770,000 - - - 10,540,000
Expenditures FY 25 FY26 FY27 FY28 FY29
FY30 &
Beyond
TOTAL
Land Acquistion -
Design 1,000,000 1,000,000
Construction 4,770,000 4,770,000 - 9,540,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
1,000,000 4,770,000 4,770,000 - - - 10,540,000
91
Project Name: City Hall Expansion Project Number: GG03
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
00
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00
00
00
00
TOTAL DESIGN BUDGET $ -
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
Construction Administration
Landscape Budget
00
00
00
00
00
00
00
00
TOTAL CONSTRUCTION BUDGET $ -
Gross SF (includes stairwells, hallways etc.)
Assignable SF
92
Project Name: City Hall Expansion Project Number: GG03
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0
Signage 0 0 $ -
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
00
00
00
00
00
00 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
000
000
000
TOTAL PURCHASED ASSET $ -
93
Capital Improvements Budget Analysis Worksheet FY24 Budget
Reason: Need a Signal at this
Description/justification: A corridor traffic study was funded by the City which identified this intersection as meeting signal
warrants. SCDOT has agreed to design, fund and install the actual traffic signals but will not do so until the various lane
improvements are completed. The City used a consultant to engineer and design the geometric improvements and is currently
being permitted through SCDOT, DHEC, OCRM and the ACOE. Final approvals are expected in the final quarter of FY24.
Construction should begin in the first quarter of FY25. The project will be bid and constructed using Development Fees and
contributions from several nearby projects.
94
Project Name: Argent Blvd-Short Cut Road Project Number: GG04
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 3,650,000 3,650,000
Debt Issuance -
Third Party Contributions 1,500,000 1,500,000
Grants -
SCDOT 350,000 350,000
Other
5,500,000 - - - -
-
- 5,500,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond
TOTAL
Land Acquistion -
Design -
Construction 5,500,000 5,500,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
5,500,000 - - - - - 5,500,000
95
Project Name: Argent Blvd-Short Cut Road Project Number: GG04
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
0 0 0
0 0 0
0 0 0
0 0
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0 0
0 0
0 0
0 0
TOTAL DESIGN BUDGET $ -
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management
Construction Administration
Landscape Budget
0 0
0 0
0 0
0 0
0 0
0 0 0
0 0 0
0 0 0
TOTAL CONSTRUCTION BUDGET $ -
Gross SF (includes stairwells, hallways etc.)
Assignable SF
96
Project Name: Argent Blvd-Short Cut Road Project Number: GG04
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 7% 0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
0 0 0
0 0 0
0 0 0
TOTAL PURCHASED ASSET $ -
97
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Argent Blvd @ East Argent Pkwy
Department: General Government
Location/address: Argent Blvd @ East Argent Pkwy
Project Number: GG05
Responsible Staff: Matt Davis
Priority: High
Project Type: Construction; Install Turn Lanes & Signals Reason: Safety
Lifespan/ Useful Life: 20 years Estimate: $ 1,500,000
Description/Justification: This is a mu lti-year project consisting of the addition of turning lanes and ultimately the
installation of a traffic signal. DA fees have been collected and will be used to pay for the design and construction of the
turning lanes. Signal warrants have been meet to justify this signal however due to the length of time to obtain environmental
permits a temporary signal is being permitted as an interim safety improvement. Regional tr affic growth on Argent Blvd
coupled with development in the East Argent area have created a need for roadway improvements. Turns from side streets
have become increasingly difficult and have been a contributer to collisions. Permanent intersection improvements will
continue to be designed and ultimately constructed. Approximately $350,000 will be expended in FY24 for initial design of
both permanent and temporary improvements and installation of temporary signal.
98
Project Name: Argent Blvd @ East Argent Pkwy Project Number: GG05
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 1,500,000 1,500,000
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
1,500,000 - - - - - 1,500,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Design 50,000 50,000
Construction 1,450,000 1,450,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
1,500,000 - - - - - 1,500,000
99
Project Name: Argent Blvd @ East Argent Pkwy Project Number: GG05
Expansion
Renovation
Increase
0 0
0 0
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface 0 0 320,000
Architecture 0 0
Engineering (MEP) 0 0
Permitting 0 0 0
TOTAL DESIGN BUDGET $ 320,000
Construction
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/ erosion
Construction Administration
Landscape Budget
00
00
00
00
00
00
00
00
TOTAL CONSTRUCTION BUDGET $ 1,450,000
Gross SF (includes stairwells, hallways etc.)
Assignable SF
100
Project Name: Argent Blvd @ East Argent Pkwy Project Number: GG05
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
00 $ -
00
00
00
00
00 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
00 $ -
00
00
00
00
00 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
000
000
000
TOTAL PURCHASED ASSET $-
101
Capital Improvements Budget Analysis Worksheet FY25 Budget
102 Main Street
Project Name: Renovation & Parking Project Number: GG06
Department: Gen Gov CIP Responsible Staff: Davis/McMahon
Location/address: 102 Main Street Priority: High
Project Type: Renovation and Expansion Reason: Space needed
Lifespan/ Useful Life: 20 - 50 years Estimate: $ 2,054,700
Description/Justification: The City purchased 102 Main street and a portion of 104 Main street. We intend to
renovate the existing house, Garage, driveway, frontyard and backyard. The building needs to be converted
from residential use to a commercial office space. This building will become the new COH
Communications/Media/IT Dept. (Staff of 7-9) The 2 car garage will be converted into studio space for
production use. We will expand our parking to allow staff parking for Police, Courts, EOC/Fire HQ and the
public. Potentially adding 150 additional parking spaces. This will require reworking the existing parking lots at
Police/Court/Fire HQ.
102
Project Name: 102 Main Street Renovation & Parking Project Number: GG06
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 380,000 380,000
Developer Agreement Fees -
Debt Issuance 944,200 350,500 1,294,700
American Rescue Plan Funds 380,000 380,000
Grants -
Other -
Other -
380,000 1,324,200 350,500 - - - 2,054,700
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design 75,000 60,000 135,000
Construction 305,000 1,189,200 1,494,200
FF&E 58,500 58,500
Miscellaneous Fees 75,000 292,000 367,000
Purchased Asset
380,000 1,324,200 350,500 - - -
-
2,054,700
103
Project Name: 102 Main Street Renovation & Parking Project Number: GG06
Garage
Renovation
House
Renovation
720 2,800
0 2,200
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
0 0 399,000
000
000
TOTAL LAND BUDGET $ 399,000
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech 27500 1 27,500
Architecture 3500 20 70,000
Engineering (MEP) 3500 10 35,000
Permitting 0 0 2,500
TOTAL DESIGN BUDGET $ 135,000
Construction S.F. Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Bldg/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
30,000 10 300,000
000
0
3,520 200 704,000
000
0 0 50,000
3,520 10 35,200
5,000 20 100,000
TOTAL CONSTRUCTION BUDGET $ 1,189,200
etc.)
Assignable SF
104
Project Name: 102 Main Street Renovation & Parking Project Number: GG06
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 9 500 $ 4,500
Ext Lts, flag poles, bike racks 5 200 $ 1,000
Signage 5 1,000 $ 5,000
Generator 1 10,000 $ 10,000
Technology 9 2,000 $ 18,000
Special Equipment Costs 100 200 $ 20,000
TOTAL FF&E $ 58,500
Best
Miscellaneous Fees Estimate/fee
Hazardous Mtl Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee
Performance Bond Fee
Contractors overhead/profit fee
0 0 $ 20,000
0 0 $ 22,000
0 0 $ 150,000
0 0 $ 100,000
00 $ -
00 $ -
TOTAL MISCELLANEOUS FEES $ 292,000
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
000
000
000
TOTAL PURCHASED ASSET $-
105
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Old City Hall - Renovation Project Number: GG07
Department: Gen Gov Responsible Staff: Davis/McMahon
Location/address: 36 Main Street Priority: Space needed
Project Type: Possible Renovation Reason: Health & Safety
Lifespan/ Useful Life: 20 years Estimate: $ 865,000
106
Project Name: Old City Hall - Renovation Project Number: GG07
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 900,000 865,000 1,765,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
900,000 865,000 - - - - 1,765,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond
TOTAL
Land Acquistion -
Design -
Construction 900,000 865,000 1,765,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
900,000 865,000 - - - - 1,765,000
107
Project Name: Old City Hall - Renovation Project Number: GG07
Expansion Renovation
0 3,000
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
0 0 0
0 0 0
0 0 0
0 0 0
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0 0 0
0 0 0
0 0 0
0 0 0
TOTAL DESIGN BUDGET $ -
Best
Construction S.F. Cost Cost per SF Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
10,000 10 100,000
3,000 5 15,000
0
3,000 250 750,000
0 0 0
0 0 0
0 0 0
0 0 0
TOTAL CONSTRUCTION BUDGET $ 865,000
Gross SF (includes stairwells, hallways etc.)
Assignable SF
108
Project Name: Old City Hall - Renovation Project Number: GG07
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
0 0 0
0 0 0
0 0 0
TOTAL PURCHASED ASSET $ -
109
Project Name: Left Turn Lanes US278 Project Number: GG08
Department: General Government
US278 and Latitude and
Location/address: Lakeside Blvds.
Project Type:
Responsible Staff: Matt Davis
Priority: High
Short lanes cause excessive
Reason: cycling of signal
Lifespan/ Useful Life: :FBST Estimate: $ 600,000
Capital Improvements Budget Analysis Worksheet FY25 Budget
110
Project Name: Left Turn Lanes US278 Project Number: GG08
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 1,100,000 1,100,000
Debt Issuance -
American Rescue Plan Funds -
Grants -
SCDOT -
Other -
1,100,000 - - - - - 1,100,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction 1,100,000 1,100,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
1,100,000 - - - - - 1,100,000
111
Project Name: Left Turn Lanes US278 Project Number:
Renovation
Expansion Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Jt venture, grant, partnership
Utility needs/infrastructure
000
000
000
00
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech 00
Architecture 0 0
Engineering (MEP) 00
Permitting 0 0
TOTAL DESIGN BUDGET $ -
N
Gross SF (includes stairwells, hallways
etc.)
Assignable SF
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work) 0 0
Demolition 0 0
ew Bldg/vertical installation 00
Remodel of existing space 0 0
Mech/Elect/Plumbing 0 0
Storm water/site mgmt 000
Construction Administration 000
Landscape Budget 000
TOTAL CONSTRUCTION BUDGET $ -
112
Project Name: Left Turn Lanes US278 Project Number: GG08
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Lights, flag poles, bike racks 0 0 $ -
Signage 0 0
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Mtl Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants 0 0 $ -
Contingency Fee (15%) 0 0
Performance Bond Fee 0 0 $ -
Contractors overhead/profit 0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
0 0 0
0 0 0
0 0 0
TOTAL PURCHASED ASSET $ -
113
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Exit 8 Sewer Project Number: GG09
Department: General Government Responsible Staff: McMahon/ Brown/ Parsons
Location/address: Exit 8 US 278 Priority: Improve Service
Project Type: Infrastructure Reason: Growth and Development
Lifespan/ Useful Life: 25 years Estimate: $ 6,326,070
Description/Justification: One of the most opportunistic commercial growth and development target areas include Exit 8
and intersection of US 278 and Medical Center Drive. As developers continue to work through methodologies of
developing this area, the availability and capacity of sewer service to this area has been identified as a major roadblock
limiting the timeliness of any projects from moving forward. The City is in agreeance to work with the developers and
local businesses in efforts to improve the sewer availability and capacity in this area.
114
Project Name: Exit 8 Sewer Project Number: GG09
Funding Sources FY25 FY26 FY26 FY28 FY29 FY30 & Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants 1,696,333 1,696,333 1,696,333 5,089,000
Other 412,357 412,357 412,357 1,237,070
Other -
2,108,690 2,108,690 2,108,690 - - - 6,326,070
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Land Acquistion -
Design -
Construction 1,622,070 1,622,070 1,622,070 4,866,210
#REF! -
Miscellaneous Fees -
Purchased Asset -
Contingency 486,620 486,620 486,620 1,459,860
2,108,690 2,108,690 2,108,690 - - - 6,326,070
Land Acquistion S.F. Cost # of Units
Best
Estimate/fee
Existing asset
New purchase
int venture, grant, partnership
Utility needs/infrastructure
0
0
0
TOTAL LAND BUDGET $ -
115
Project Name: Exit 8 Sewer Project Number: GG09
Design S.F. Cost # of Units
Best
Estimate/fee
Survey, Geotech, Subsurface
Architecture
Engineering
Permitting
0
0
0
TOTAL DESIGN BUDGET $ -
Construction S.F. Cost # of Units
Best
Estimate/fee
Construction
ite work (civil work, parking)
Demolition
Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site
management/ erosion control
Construction Administration
Landscape Budget
4,866,210
0
0
0
0
0
0
0
0
TOTAL CONSTRUCTION BUDGET $ 4,866,210
116
Project Name: Exit 8 Sewer Project Number: GG09
Miscellaneous Fees S.F. Cost #o fU n i t s
Best
Estimate/fee
zardous Materials Abatement
Construction Testing Fees
Specialty Consultants
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit
1,459,860
TOTAL MISCELLANEOUS FEES $ 1,459,860
Purchased Asset Estimated Cost Quantity Estimated Cost
TOTAL PURCHASED ASSET $ -
TOTALPROJECT COST
117
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Equipment Trailer
Department: Police Dept
Location/address: Citywide
Project Type: Continuation
Lifespan/ Useful Life: 5 years
Project Number: PD01
Responsible Staff: Jenkins
Priority: High
Reason: Public Safety
Estimate: $
16,453
Description/Justification: We have a total of two Polaris Rangers and 1 six seater golf cart. We currently have
an old landscape trailer to haul equipment and no ability to keep our assets secure. With an enclosed trailer we
can keep one Polaris ready to deploy as well as house equipment that we may need for training/ crime scene
equipment etc. that will remain readily deployable. This will also allow us to keep the equipment in the trailer
versus housing it inside of the Police Department as space is limited. This particular price quote is the trailer
outfitted with cabinets in the front, the ETrac system used to tie down equipment, loading lights, and
recepticals on the interior. WE CAN PURCHASE THIS TRAILER WITHOUT UPGRADES FOR $12,000.
118
Project Name: Equipment Trailer Project Number: PD01
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 16,453 16,453
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
16,453 - - - - - 16,453
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
8.5 x 18 Trailer 12,000 12,000
Accessories 4,453 4,453
16,453 - - - - - 16,453
119
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Training Facility @ Location TBD Project Number: PD02
Department: Police Dept Responsible Staff: Jenkins / Melnick
Location/address: TBD Priority: High
Project Type: Training Facility Reason: Safety/Training
Lifespan/ Useful Life: 15-30 years Estimate: $ 250,000
120
Project Name: Training Facility @ Location TBD Project Number: PD02
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Land Acquisition 250,000 250,000
Other -
250,000 - - - - - 250,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Construction 250,000 250,000
FF&E -
Miscellaneous Fees -
Site Work (Parking and Fencing)
Purchased Asset -
250,000 - - - - - 250,000
121
Project Name: Training Facility @ Location TBD Project Number: PD02
Expansion
Renovation
Increase
2,000 0
0 0
Best
FY24 Construction S.F. Cost per SF Estimate/fee
Site work (civil work, 4" slab foundation)
Demolition
New Building/vertical installation
1 restroom
Mech/Elect/Plumbing -septic & well
HVAC
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
2,000 8 16,000
0 0 0
2,000 25 50,000
100 50 5,000
2 7,500 15,000
1 13,000 13,000
1,000 1 1,000
1,000 1 1,000
25 200 5,000
TOTAL CONSTRUCTION BUDGET $ 106,000
Best
FY25 Construction S.F. Cost per SF Estimate/fee
Parking Lot
Manual Fence Gate
Upgrades to Physical Agility
Upgraded Obstacles
Permitting
Contingency / Landscaping
Privacy Screening
12,000 10,000
10,000
3,600 44,280
2,500
1,000
14,000
0 0 2,500
TOTAL CONSTRUCTION BUDGET $ 84,280
Gross SF (includes stairwells, hallways etc.)
Assignable SF
122
Project Name: Training Facility @ Location TBD Project Number: PD02
Cost per Best
FF&E # of Units Unit Estimate/fee
Movable Divider partitions
Exterior lighting/flood lamps
Signage
Generator
Technology/security camera/gate
Special Equipment Costs
10 1,000 $ 10,000
12 500 $ 6,000
10 300 $ 3,000
0 0 $ -
20 200 $ 4,000
0 0 $ -
TOTAL FF&E $ 23,000
Best
Miscellaneous Fees LF # of Units Estimate/fee
Hazardous Materials Abatement
Construction Testing Fees
Security fencing
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
0 0 $ -
0 0 $ -
$ -
0 0 $ -
0 0 $ -
0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset Cost Quantity Cost
0 0 0
0 0 0
0 0 0
TOTAL PURCHASED ASSET $ -
123
Project Name: Hardeeville Police Dept Project Number: PD03
Department: Police
Location/address: TBD - along 278, Brickyard
Project Type: New Construction
Lifespan/ Useful Life: 50
Responsible Staff: Woodward
Priority: Immediate
Reason: Public Safety
Total Project Cost
Estimate: $27,240,050
Capital Improvements Budget Analysis Worksheet FY25 Budget
Description/Justification: This building will serve as a new Police Dept., the new addition/renovation was a
temporary solution to the overcrowding. We are over occupancy and growing. Funding sources include
potential grants, penny sales tax and general funds.
124
Project Name: Hardeeville Police Dept Project Number: PD03
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 3,768,800 22,868,250 603,000 27,240,050
American Rescue Plan Funds -
Grants -
Other -
Other -
3,768,800 22,868,250 603,000 - - - 27,240,050
FY30 &
Expenditures FY25 FY26 FY27 FY28 FY29 Beyond TOTAL
Land Acquistion 725,000 725,000
Design 3,043,800 3,043,800
Construction 20,025,000 20,025,000
FF&E - 603,000 603,000
Miscellaneous Fees 2,843,250 2,843,250
3,768,800 22,868,250 603,000 - - - 27,240,050
125
Project Name: Hardeeville Police Dept Project Number: PD03
New Build
45,000 0
0 0
Land Acquistion
Cost Per
Acre acre
Best
Estimate/fee
Planning fees (legal,
permitting) 5 5,000 25,00 0
New purchase 5 100,000 500,00 0
Utility needs/infrastructure 5 40,000 200,00 0
TOTAL LAND BUDGET $725,000
Design
percent of
total
Best
Estimate/fee
ivil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0.03 20,025,000 600,750
0.1 20,025,000 2,002,500
0.02 20,025,000 400,500
0.002 20,025,000 40,050
TOTAL DESIGN BUDGET $3,043,800
Construction S.F. cost per sq ft
Best
Estimate/fee
Site work (civil work, parking)
w Building/vertical installation
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
25,000 50 1,250,00 0
45,000 400 18,000,00 0
20,000 15 300,00 0
7,500 30 225,00 0
2,500 100 250,00 0
TOTAL CONSTRUCTION BUDGET $20,025,000
Gross SF (includes stairwells, hallways
etc.)
Assignable SF
126
Project Name: Hardeeville Police Dept Project Number: PD03
FF&E
Cost per
# of Units Unit
Best
Estimate/fee
Desks, office furniture etc
Health and wellness equipment
xt Lights, flag poles, bike racks
Signage
Technology & Security
Generator
65 4,000 $260,000
65 200 $13,000
100 200 $20,000
10 1,000 $10,000
100 2,000 $200,000
1 100,000 $100,000
TOTAL FF&E $603,000
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
azardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (5%)
Performance Bond Fee
00 $ -
4000 10 $40,000
1000 200 $200,000
0.05 $1,001,250
0.08 $1,602,000
TOTAL MISCELLANEOUS FEES $2,843,250
127
Capital Improvements Budget Analysis Worksheet FY25 Budget
Description/justification: Fleet is in constant need for replacement/rotation. 3 vehicles with the highest
mileage and age will be replaced and will be using the general fund for this purchase. We are asking for 6
new positions and will need vehicles for these positions. These 6 new vehicles will be purchased with
Developer Agreement fees.
128
Project Name: Police Fleet Project Number: PD04
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 TOTAL
General Fund -
veloper Agreement Fees -
Debt Issuance 873,900 873,900
ican Rescue Plan Funds -
Grants -
Other -
Other -
873,900 - - - - - 873,900
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 TOTAL
Purchased Asset 873,900 873,900
Purchased Asset -
873,900 - - - - - 873,900
Estimated
Purchased Asset Cost per unit Quantity Cost
Vehicle for new investigator
in 24 60,000 1 60,000
Upfitting Investigator Vehicle 25,000 1 25,000
New (6) and Replacement (3)
Vehicles 60,000 9 540,000
Graphics 1,100 9 9,900
Upfitting for Staffing Vehicle
Increase 35,000 9 315,000
Tags/title/taxes/registration 1,000 10 10,000
TOTAL PURCHASED ASSET $ 959,900
DA Funds
New Admin 0
Patrol Vehicle 0
Motorola Radios 0
Upfitting new admin 0
Upfitting Patrol equipment 0
Graphics 0
TOTAL PURCHASED ASSET $ -
129
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Axon Safety Plan
Department: Police Dept
Location/address: Citywide
Project Type: Continuation
Lifespan/ Useful Life: 5 year contract
Project Number: PD05
Responsible Staff: Jenkins/Woodward
Priority: High
Reason: Public Safety
Estimate: $
1,358,350
Description/Justification: We are in our 3rd year of contract however, the contract must be rewritten to
accommodate all of the new hires and additions over the last three years, and put us back on a 5 year plan. This
new contract will include the upgrade of our tasers as well as incorporate the add ons. This has to be done to
eliminate multiple invoices every time an addition is made and will incorporate one invoice per year. TOTAL
NUMBER IS FOR 5 YEAR CONTRACT
130
Project Name: Axon Safety Plan Project Number: PD05
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 271,670 271,670 271,670 271,670 271,670 1,358,350
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
271,670 271,670 271,670 271,670 271,670 - 1,358,350
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
5 year contract 271,670 271,670 271,670 271,670 271,670 1,358,350
-
271,670 271,670 271,670 271,670 271,670 - 1,358,350
131
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Citywide Cameras
Department: Police Dept
Location/address: Citywide
Project Type: Public Safety Phase 4 New Cameras
Lifespan/ Useful Life: 5 years
Project Number: PD06
Responsible Staff: Michaud/Woodward
Priority: High
Reason: Safety
Estimate: $
560,436
Description/Justification: We are currently in phase 4 and are wanting to add additional cameras to Industrial
Park (old and new) River Port, and Argent. 2 cameras for old Industrial Park, 1 camera for new industrial park, 1
at River Port, 1 at Argent. The remaining years show additional 5 cameras each year for future phases which
would include Argent Blvd Loop Road etc.
132
Project Name: Citywide Cameras Project Number: PD06
Funding
Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 95,906 92,906 92,906 92,906 92,906 92,906 560,436
Debt Issuance -
American Rescue Plan Funds -
Grants -
95,906 92,906 92,906 92,906 92,906 92,906 560,436
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Construction 3,000 3,000
Other -
Power & Tech Fees 720 720 720 720 720 720 4,320
Service & Maintenance 5,500 5,500 5,500 5,500 5,500 5,500 33,000
Purchased Asset 86,686 86,686 86,686 86,686 86,686 86,686 520,116
95,906 92,906 92,906 92,906 92,906 92,906 560,436
133
Project Name Citywide Cameras Project Number: PD06
n
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
Cameras 15,057 5 $ 75,285.55
Lift rentals 500 12 $ 6,000.00
Annual IP/Technology
costs/fees 480 5 $ 2,400.00
TOTAL PURCHASED ASSET $ 83,685.55
Yearly Operation fees
Dominion Power annual 120 5 $ 600.00
Annual Service & $ -
Best
Construction cost per qty QTY Estimate/fee
k (civil work, 4" slab foundation)
Demolition
uilding/vertical installation
1 restroom
Elect/Plumbing -septic & well
Electrician/inspections
Storm water/site
struction Administration
Landscape Budget
500 6 3,000
TOTAL CONSTRUCTION BUDGET $ 3,000
134
THS PAGE INTENTIONALLY LEFT BLANK
135
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Entry Team Kits
Department: Police Dept
Location/address: Citywide
Project Type: JRT Equipment
Lifespan/ Useful Life: 5 years
Project Number: PD07
Responsible Staff: Jenkins
Priority: High
Reason: Safety
Estimate: $
35,200
Description/Justification: The JRT ( Joint Response Team) which is comprised of a group of well trained, professional law
enforcement officers who are responsible for conducting search warrants and response to high priority calls in the event specialized
training and equipment is needed, needs to purchase 4 new entry kits. The kit includes everything the Officer needs to be a member
of this team. The kit includes, helmet, communication devices, ballistic vest, protective padding and all attachments for the vest.
The Joint Response Team is comprised of members of the Hardeeville Police Department and the Jasper County Sheriffs Office.
This team has been utilized multiple times.The need to maintain equipment, and add additional is paramount to the success and
overall safety of this team.
136
Project Name: Entry Team Kits Project Number: PD07
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 35,200 35,200
Developer Agreement Fees -
CIP -
American Rescue Plan Funds -
Grants -
Other -
Other -
35,200 - - - - - 35,200
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Equipment Purchase 35,200 35,200
Construction -
Power & Tech Fees -
Service & Maintenance -
Purchased Asset -
35,200 - - - - - 35,200
137
Project Name: Entry Team Kits Project Number: PD07
Construction cost per qty QTY
Best
Estimate/fee
Site work (civil work, 4" slab foundation)
Demolition
New Building/vertical installation
1 restroom
Mech/Elect/Plumbing -septic & well
Electrician/inspections
Storm water/site management/ erosion
Construction Administration
Landscape Budget
0
TOTAL CONSTRUCTION BUDGET $-
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
Tactical Equipment Kit 8,800 4 $ 35,200.00
$ -
$ -
TOTAL PURCHASED ASSET $ 35,200.00
Yearly Operation fees
Dominion Power annual $ -
Annual Service & Maintenance contract $ -
138
THIS PAGE INTENTIONALLY LEFT BALNK
139
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Covert Pole Camera
Department: Police Dept
Location/address: Citywide
Project Type: Surveillance Equipment
Lifespan/ Useful Life: 5 years
Project Number: PD08
Responsible Staff: Jenkins
Priority: High
Reason: Investigations
Estimate: $
7,500
Description/Justification: The Hard eeville Police Department is requesting the purchase of 1 covert pole camera. This camera can
be utilized to quickly deploy into areas to gather intel and conduct surveillance operations. A prime example of this would be
having vehicle break-ins in a certain area. This camera would prove extremely beneficial for the capture of those involved. We
would be able to utilize this pole camera unnoticed to capture surveilance of that area. The camera has the ability to stream live to
the investigators utilizing the camera as well as record. We do not have this piece of equipment for our agency and is a great tool in
our investigative efforts.
140
Project Name: Covert Pole Camera Project Number: PD08
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 7,500 7,500
Developer Agreement Fees -
CIP -
American Rescue Plan Funds -
Grants -
Other -
Other -
7,500 - - - - - 7,500
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Equipment Purchase 7,500 7,500
Construction - -
Power & Tech Fees -
Service & Maintenance -
Purchased Asset -
7,500 - - - - - 7,500
141
Project Name: Covert Pole Camera Project Number: PD08
Construction cost per qty QTY
Best
Estimate/fee
Site work (civil work, 4" slab foundation)
Demolition
New Building/vertical installation
1 restroom
Mech/Elect/Plumbing -septic & well
Electrician/inspections
Storm water/site management/ erosion
Construction Administration
Landscape Budget
0
TOTAL CONSTRUCTION BUDGET $-
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
Covert Pole Camera 8,800 4 $ 7,500.00
$ -
$ -
TOTAL PURCHASED ASSET $ 7,500.00
Yearly Operation fees
Dominion Power annual $ -
Annual Service & Maintenance contract $ -
142
THIS PAGE INTENTIONALLY LEFT BLANK
143
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: EOC Storm Upgrades Project Number: FD01
Department: Fire Responsible Staff: Rowell
Location/address: 30 Martin St Priority: High
Project Type: Remodel Reason: Safety/Usefull
Lifespan/ Useful Life: 10 years Total Project Cost Estimate: $ 120,000
Description/Justification: The MEOC needs to be able to service the city residents as a vital, critical infrastructure building in the
event of natural disasters. Currently the windows need to be replaced to withstand hurricane force winds with the capability of
using storm reinforcements. This will greatly enhance the functionality, safety, and usability of this space. The replacement of the
door will give us the capabilities to have a weather tight and functioning secured front entryway. These improvements will also
give a better curb appeal to the building to represent the City of Hardeeville.
144
Project Name: EOC Storm Upgrades Project Number: FD01
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 120,000 120,000
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
120,000 - - - - - 120,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction 120,000 120,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
120,000 - - - - - 120,000
145
Project Name: EOC Storm Upgrades Project Number: FD01
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
00 0
00 0
00 0
00 0
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Replace doors and windows
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
00 0
00 0
00 0
0 0 120,000
00 0
0 0 0
00 0
00 0
TOTAL CONSTRUCTION BUDGET $ 120,000
Gross SF (includes stairwells, hallways etc.)
Assignable SF
146
Project Name: EOC Storm Upgrades Project Number: FD01
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset Estimated Cost Quantity Estimated Cost
00 0
00 0
00 0
TOTAL PURCHASED ASSET $-
147
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Rescue Watercraft Project Number: FD02
Department: Fire Responsible Staff: Camp
Location/address: 27 Martin St Priority: High
Project Type: Vehicle acquisition Reason: Public Safety
Lifespan/ Useful Life: 10 years Total Project Cost Estimate: $ 50,000
Description/Justification: Hardeeville first responder organizations do not currently have any boat assets for facilitating searches or
rescues. HFD has multiple water rescue trained personnel, and multiple personnel with boat operating experience. We have the
opportunity to pioneer rescue for the entire county, including our own areas (Savannah River and Latitude Margaritaville) where water
access needs are a distinct possibility. In my tenure as the Fire Chief we have had 3 separate incidents where we needed a boat and had
to wait for one to arrive. On February 28,2024, we lost a citizen in a water accident where we could have deployed the boat.
148
Project Name: Rescue Watercraft Project Number: FD02
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 50,000 50,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
50,000 - - - - - 50,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset 50,000 50,000
50,000 - - - - - 50,000
149
Project Name: Rescue Watercraft Project Number: FD02
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
Gross SF (includes stairwells, hallways etc.)
Assignable SF
150
Project Name: Rescue Watercraft Project Number: FD02
FF&E #o fU n i t s Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost #o fU n i t s
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset Estimated Cost Quantity Estimated Cost
50,000 1 50,000
000
000
TOTAL PURCHASED ASSET $ 50,000
TOTAL CONSTRUCTION BUDGET $ -
151
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: UTV for emergency response Project Number: FD03
Department: Fire Responsible Staff: Camp
Location/address: 30 Martin St Priority: Very High
Project Type: Vehicle acquisition Reason: Public Safety
Lifespan/ Useful Life: 10 Total Project Cost Estimate: $ 70,000
Description/Justification: We need a multipurpose UTV to serve the areas of town that are unreachable by our apparatus. This
is needed for areas where there are no roads, along the train tracks, along biking/walking trails and in areas of development that
are unreachable. Vehicle will be outfitted for EMS and Fire responses. Needed for city events.
152
Project Name: UTV for emergency response Project Number: FD03
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 70,000 70,000
American Rescue Plan Funds -
Grants -
Other -
Other -
70,000 - - - - - 70,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset 70,000 70,000
70,000 - - - - - 70,000
153
Project Name: UTV for emergency response Project Number: FD03
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
TOTAL CONSTRUCTION BUDGET $-
Gross SF (includes stairwells, hallways etc.)
Assignable SF
154
Project Name: UTV for emergency response Project Number: FD03
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset Estimated Cost Quantity Estimated Cost
UTV 70,000 1 70,000
000
000
TOTAL PURCHASED ASSET $ 70,000
155
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Ambulance Program Project Number: FD04
Department: Fire Responsible Staff: Camp
Location/address: 29 Martin St Priority: High
Project Type: Equipment Reason: Public Safety
Lifespan/ Useful Life: 5 Total Project Cost Estimate: $ 1,350,000
Description/Justification: Now that we have started the ALS transport service we need to look ahead and plan for an additional
Ambulance. We have to cover over 56 square miles we are going to need to expand the transport service. This additional
ambulance would be located at Station 81 and the current Ambulance would move from Station 83 to Station 82. The additional
ambulance would also provide for additional resources for all call types. With the aging population growth on the east side of
town we need to increase the availability of our ambulances. Please remember these vehicle are not like a car, it is extremely
hard to find one in this market.
156
Project Name: Ambulance Program Project Number: FD04
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 450,000 450,000 450,000 1,350,000
American Rescue Plan Funds -
Grants -
Other -
Other -
450,000 - 450,000 - 450,000 - 1,350,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset 450,000 450,000 450,000 1,350,000
450,000 - 450,000 - 450,000 - 1,350,000
157
Project Name: Ambulance Program Project Number: FD04
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Bldg/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
TOTAL CONSTRUCTION BUDGET $-
Gross SF (includes stairwells, hallways etc.)
Assignable SF
158
Project Name: Ambulance Program Project Number: FD04
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset Estimated Cost Quantity Estimated Cost
Ambulance 450,000 3 1,350,000
000
000
TOTAL PURCHASED ASSET $ 1,350,000
159
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Opticom Project Number: FD05
Department: Fire Responsible Staff: Rowell
Location/address: Multiple Priority: High
Project Type: Equipment Reason: Public Safety
Lifespan/ Useful Life: 20 years Total Project Cost Estimate: $ 105,000
Description/Justification: This allows emergency vehicles to approach signal controlled intersections and pass through in the
most efficient manner in order to reduce response times and increase the safety of the public and our personnel.
160
Project Name: Opticom Project Number: FD05
Funding Sources FY24 FY25 FY26 FY27 FY28
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 105,000 105,000
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
105,000 - - - - - 105,000
Expenditures FY24 FY25 FY26 FY27 FY28
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset 105,000 105,000
105,000 - - - - - 105,000
161
Project Name: Opticom Project Number: FD05
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
TOTAL CONSTRUCTION BUDGET $-
Gross SF (includes stairwells, hallways etc.)
Assignable SF
162
Project Name: Opticom Project Number: FD05
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset Estimated Cost Quantity Estimated Cost
Opticom System 105,000 1 105,000
000
000
TOTAL PURCHASED ASSET $ 105,000
163
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Vehicle Replacement Project Number: FD06
Department: Fire Responsible Staff: Camp
Location/address: 30 Martin St. Priority: High
Project Type: Vehicle Replacement Reason: Aging vehicles
Lifespan/ Useful Life: 5 Total Project Cost Estimate: $ 165,000
Description/Justification: 2016 Ford Interceptor is due for replacement, this vehicle is used daily by the Fire Inspector. The 2015
Tahoe is due for replacement, the replacement will go to the training officer and that vehicle will be moved into utility role.
164
Project Name: Vehicle Replacement Project Number: FD06
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 165,000 165,000
American Rescue Plan Funds -
Grants -
Other -
Other -
165,000 - - - - - 165,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset 165,000 165,000
165,000 - - - - - 165,000
165
Project Name: Vehicle Replacement Project Number: FD06
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
00 0
00 0
00 0
00 0
TOTAL DESIGN BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
TOTAL CONSTRUCTION BUDGET $-
Gross SF (includes stairwells, hallways etc.)
Assignable SF
166
Project Name: Vehicle Replacement Project Number: FD06
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $-
Purchased Asset Estimated Cost Quantity Estimated Cost
SUV
Battalion SUV
75,000 1 75,000
90,000 1 90,000
000
TOTAL PURCHASED ASSET $ 165,000
167
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Fire Station 85 & PD substation Project Number: FD07
Department: Fire & Police Responsible Staff: Camp
Location/address: East Argent Priority: High
Project Type: New Construction Reason: Public Safety
Lifespan/ Useful Life: 50 Total Project Cost Estimate: $ 7,444,175
Description/Justification: East Argent Loop is currently under construction. Once the road is finished this fire station will need to
be built to provide fire protection for the Northern end of East Argent.
168
Project Name: Fire Station 85 & PD substation Project Number: FD07
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 1,655,950 5,600,225 188,000 7,444,175
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
1,655,950 5,600,225 188,000 - - - 7,444,175
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Planning 250,000 250,000
Design 705,950 705,950
Construction 5,042,500 5,042,500
FF&E 188,000 188,000
Miscellaneous Fees 557,725 557,725
Purchased Asset 700,000 700,000
1,655,950 5,600,225 188,000 - - - 7,444,175
169
Project Name: Fire Station 85 & PD substation Project Number: FD07
Expansion
Renovation
Increase
7,500 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
20,000 7.5 150,000
000
20,000 5 100,000
TOTAL LAND BUDGET $ 250,000
Design
Best
percent of total Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0.03 $ 5,042,500 151,275
0.075 $ 5,042,500 378,188
0.03 $ 5,042,500 151,275
0.005 $ 5,042,500 25,213
TOTAL DESIGN BUDGET $ 705,950
Construction
Best
S.F. cost per sq ft Estimate/fee
Site work (civil work, parking)
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
7,500 200 1,500,000
7,500 445 3,337,500
0 0
0 0
2,500 22 55,000
0
2,000 75 150,000
TOTAL CONSTRUCTION BUDGET $ 5,042,500
Gross SF (includes stairwells, hallways etc.)
Assignable SF
170
Project Name: Fire Station 85 & PD substation Project Number: FD07
FF&E #o fU n i t s
Best
Cost per Unit Estimate/fee
Beds, Desks, office furniture etc 8 4,000 $ 32,000
Ext Lights, flag poles, bike racks 15 400 $ 6,000
Signage 40 100 $ 4,000
Compressor scba 1 30,000 $ 30,000
Technology 8 2,000 $ 16,000
Upfitting of bay 2 50,000 $ 100,000
TOTAL FF&E $ 188,000
Miscellaneous Fees SF Cost #o fU n i t s
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 2000 10 $ 20,000
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 7500 15 $ 112,500
Performance Bond Fee 7500 8 $ 60,000
Contractors overhead/profit fee 7% $ 5,217,500.00 0.07 $ 365,225
TOTAL MISCELLANEOUS FEES $ 557,725
3 year lead time3
Purchased Asset Estimated Cost Quantity Estimated Cost
Apparatus
Ambulance
700,000 1 700,000
0
000
TOTAL PURCHASED ASSET $ 700,000
171
Fire Station 86 & PD substation Project Number: FD08
Responsible Staff:
Priority:
Reason:
Lifespan/ Useful Life: 50 Total Project Cost Estimate: 7,944,175$
Description/Justification: Inside Margaritaville, needed for continued growth in that area, and extended response times.
Location/address: East Argent High
Project Type: New Construction Public Safety
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Fire & Police Camp
172
Project Name: Fire Station 86 & PD substation Project Number: FD08
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 2,155,950 5,600,225 188,000 7,944,175
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
2,155,950 5,600,225 188,000 - - - 7,944,175
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Planning 250,000 250,000
Design 705,950 705,950
Construction 5,042,500 5,042,500
FF&E 188,000 188,000
557,725 557,725
1,200,000 1,200,000
2,155,950 5,600,225 188,000 - - - 7,944,175
Miscellaneous Fees
Purchased Asset
173
Project Name: Fire Station 86 & PD substation Project Number: FD08
Expansion
Renovation
Increase
7,500 0
00
SF Cost Per SF
Best
Estimate/fee
000
20,000 7.5 150,000
000
20,000 5 100,000
250,000$
percent of total
Best
Estimate/fee
0.03 5,042,500$ 151,275
0.075 5,042,500$ 378,188
0.03 5,042,500$ 151,275
0.005 5,042,500$ 25,213
705,950$
S.F. cost per sq ft
Best
Estimate/fee
7,500 200 1,500,000
7,500 445 3,337,500
00
00
2,500 22 55,000
0
2,000 75 150,000
5,042,500$ TOTAL CONSTRUCTION BUDGET
Landscape Budget
Engineering (MEP)
Permitting
TOTAL DESIGN BUDGET
Construction
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Existing asset
Site work (civil work, parking)
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Civil, Survey, Geotech, Subsurface
New purchase
Architecture
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
174
Project Name: Fire Station 86 & PD substation Project Number: FD08
# of Units Cost per Unit
Best
Estimate/fee
8 4,000 32,000 $
15 400 6,000 $
40 100 4,000 $
1 30,000 30,000 $
8 2,000 16,000 $
2 50,000 100,000 $
188,000$
SF Cost # of Units
Best
Estimate/fee
00 - $
2000 10 20,000 $
00 - $
7500 15 112,500 $
7500 8 60,000 $
5,217,500.00$ 0.07 365,225 $
557,725$
Estimated Cost Quantity
Estimated
Cost
700,000 1 700,000 3 year lead time
500,000 1 500,000 2 year lead time
000
1,200,000$
Apparatus
Ambulance
TOTAL PURCHASED ASSET
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
TOTAL MISCELLANEOUS FEES
Purchased Asset
Construction Testing Fees
FF&E
Beds, Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Compressor scba
Technology
Upfitting of bay
TOTAL FF&E
Miscellaneous Fees
Hazardous Materials Abatement
175
Truck 83 Refurb Project Number: FD09
Responsible Staff:
Priority:
Reason:
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Fire Rowell
Location/address: 30 Matin St High
Project Type: Vehicle Refurb Dated and aged equipment
Description/Justification: Refurbish Truck 83 to continue its usefull life time. Cheaper than purchasing an new ladder truck.
Lifespan/ Useful Life: 10 Total Project Cost Estimate: 250,000$
176
Project Name: Truck 83 Refurb Project Number: FD09
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 250,000 250,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
250,000 - - - - - 250,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
-
250,000 250,000
250,000 - - - - - 250,000
Miscellaneous Fees
Purchased Asset
177
Project Name: Truck 83 Refurb Project Number: FD09
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
000
-$
SF Cost per SF
Best
Estimate/fee
00 0
00 0
00 0
00 0
-$
S.F. Cost Cost per SF
Best
Estimate/fee
000
000
000
000
000
000
000
000
-$
Land Acquistion
Architecture
New purchase
TOTAL LAND BUDGET
Design
Civil, Survey, Geotech, Subsurface
Joint venture, grant, partnership
Utility needs/infrastructure
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Construction Administration
Engineering (MEP)
Permitting
TOTAL DESIGN BUDGET
Construction
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Site work (civil work, parking)
Landscape Budget
TOTAL CONSTRUCTION BUDGET
178
Project Name: Truck 83 Refurb Project Number: FD09
# of Units Cost per Unit
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
Estimated
Cost Quantity
Estimated
Cost
250,000 1 250,000
000
000
250,000$
Hazardous Materials Abatement
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL FF&E
Miscellaneous Fees
Purchased Asset
Refurb T-83
TOTAL PURCHASED ASSET
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
TOTAL MISCELLANEOUS FEES
179
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Station 82 New Build Project Number: FD10
Department: Fire Responsible Staff: Camp & McMahon
Location/address: Village Dr Priority: High
Project Type: New Build Reason: Mold
Lifespan/ Useful Life: 30 Years Total Project Cost Estimate: $ 5,657,000
Description/Justification: Station 82 is in disrepair and is being demolished. Public Safety is at risk everyday this station is not
operational.
180
Project Name: Station 82 New Build Project Number: FD10
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 3,050,000 3,050,000
American Rescue Plan Funds -
Grants -
Land Acquisition 1,650,000 1,650,000
Other -
4,700,000 - - - - - 4,700,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion - -
Design 525,000 525,000
Construction 3,243,000 3,243,000
FF&E 194,000 194,000
Miscellaneous Fees 738,000 738,000
Purchased Asset - -
4,700,000 - - - - - 4,700,000
181
Project Name: Station 82 New Build Project Number: FD10
New Build
Renovation
Increase
12,000 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
00
130,680 0 0
000
TOTAL LAND BUDGET $-
Design SF Cost per SF
Best
Estimate/fee
Survey, Geotech, Subsurface
Architecture
Engineering
Permitting
4800 14 67,200
12000 14.75 177,000
12000 23.4 280,800
00
TOTAL DESIGN BUDGET $ 525,000
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
0
0
12,000 350 4,200,000
0
000
0
000
0
TOTAL CONSTRUCTION BUDGET $ 4,200,000
Gross SF (includes stairwells, hallways etc.)
182
Project Name: Station 82 New Build Project Number: FD10
FF&E # of Units
Best
Cost per Unit Estimate/fee
Desks, office furniture etc 20 4,000 $ 80,000
Ext Lights, flag poles, bike racks 15 400 $ 6,000
Signage 40 200 $ 8,000
Generator 1 30,000 $ 30,000
Technology 10 2,000 $ 20,000
Gear Extractor/Bay Equipment 2 25,000 $ 50,000
TOTAL FF&E $ 194,000
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ -
Construction Testing Fees 12000 2 $ 24,000
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 $ 630,000
Performance Bond Fee(2%) 0 $ 84,000
$-
TOTAL MISCELLANEOUS FEES $ 738,000
Purchased Asset Estimated Cost Quantity Estimated Cost
000
000
000
TOTAL PURCHASED ASSET $-
183
Radio Replacement Project Number: FD11
Responsible Staff:
Priority:
Reason:
Old New
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Fire CAMP
Location/address: The City High
Project Type: Replacement Public Safety
Lifespan/ Useful Life: 5-10 years Total Project Cost Estimate: #REF!
Description/Justification: Palmetto 800 is swithcing to TDMA which is P25-Phase 2 in 3ish years. Our current radius are older
models that will support Phase-2 but need to be updated. Putting money into dated electronic equipment is not best practices.
184
Project Name: Radio Replacement Project Number: FD11
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 210,000 210,000 210,000 630,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
210,000 210,000 210,000 - - - 630,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
30 Radio Replacements 210,000 210,000 210,000 630,000
#REF! -
Construction -
FF&E -
-
-
210,000 210,000 210,000 - - - 630,000
Miscellaneous Fees
Purchased Asset
185
Project Name: Radio Replacement Project Number: FD11
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
000
-$
S.F. Cost Cost per SF
Best
Estimate/fee
000
000
000
000
000
000
000
000
-$
New purchase
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
Existing asset
Site work (civil work, parking)
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Construction Administration
Construction
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Landscape Budget
TOTAL CONSTRUCTION BUDGET
186
Project Name: Radio Replacement Project Number: FD11
# of Units Cost per Unit
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
Estimated Cost Quantity Estimated Cost
210,000 3 630,000
000
000
630,000$
Hazardous Materials Abatement
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL FF&E
Miscellaneous Fees
Purchased Asset
Radio Replacement
TOTAL PURCHASED ASSET
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
TOTAL MISCELLANEOUS FEES
187
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Axon Cameras Project Number: FD12
Department: Fire Responsible Staff: Camp
Location/address: The City Priority: HIGH
Project Type: Cameras Reason: Safety
Lifespan/ Useful Life: 5yr Estimate: $ 206,250
Description/Justification: Body Cameras and Vehicle Cameras to protect our assets and personel.
188
Project Name: Axon Cameras Project Number: FD12
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 41,250 41,250 41,250 41,250 41,250 206,250
Developer Agreement Fees -
Debt Issuance -
Other -
Other -
41,250 41,250 41,250 41,250 41,250 - 206,250
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Body Cams 10,500 10,500 10,500 10,500 10,500 52,500
Fleet 3 30,750 30,750 30,750 30,750 30,750 153,750
Construction -
FF&E -
Miscellaneous Fees -
Purchased Asset -
41,250 41,250 41,250 41,250 41,250 - 206,250
189
Project Name: Axon Cameras Project Number: FD12
Renovation
Expansion Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
000
TOTAL LAND BUDGET $-
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
ew Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
000
000
000
000
000
0 0 0
000
000
TOTAL CONSTRUCTION BUDGET $-
Gross SF (includes stairwells, hallways etc.)
Assignable SF
190
Project Name: Axon Cameras Project Number: FD12
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
xt Lights, flag poles, bike racks 0 0 $ -
Signage 0 0 $ -
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ -
H
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
Body Cams
Fleet 3 Cameras
10,500 5 52,500
30,750 5 153,750
000
TOTAL PURCHASED ASSET $ 206,250
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
azardous Materials Abatement 0 0 $ -
Construction Testing Fees 0 0 $ -
Specialty Consultants (fencing) 0 0 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $ -
191
Capital Improvements Budget Analysis Worksheet FY25 Budget
Reason: Future Cost Savings
Description/Justification: Project renovates existing Bay 2 at the PWD facility to more efficiently provide vehicle
maintenance by increasing available floor space to perform maintenance operations on multiple vehicles and equipment
simultaneously. Project will demolish existing office and storage space; relocate existing vehicle lift; install additioinal
vehicle lift; install modular office space; replace existing roll up door; install slip resistant flooring; install new storage
for parts and supplies.
192
Project Name: PWD Bay 2 Renovation Project Number: PW01
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 154,440 154,440
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
154,440 - - - - - 154,440
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond
TOTAL
Land Acquistion - -
Design 6,200 6,200
Construction 126,140 126,140
FF&E 15,900 15,900
Miscellaneous Fees 6,200 6,200
Purchased Asset - -
154,440 - - - - - 154,440
193
Project Name: PWD Bay 2 Renovation Project Number: PW01
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
2,478 0 0
n/a n/a n/a
n/a n/a n/a
0 0 0
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0 7 0
0 5.5 0
3100 1.5 4,650
3100 0.5 1,550
TOTAL DESIGN BUDGET $ 6,200
Best
Construction S.F. Cost per SF Estimate/fee
Site work (civil work, parking)
Demolition
ew Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
0 11 0
1,000 10 10,000
96 15 1,440
3,100 27 83,700
3,100 7.5 23,250
0 5 0
3,100 3 7,750
0 10 0
TOTAL CONSTRUCTION BUDGET $ 126,140
etc.)
Assignable SF
194
Project Name: PWD Bay 2 Renovation Project Number: PW01
FF&E #o f U n i t s
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 1 400 $ 400
xt Lights, flag poles, bike racks 0 200 $ -
Signage 1 500 $ 500
Generator 0 25,000 $ -
Technology 0 1,000 $ -
Special Equipment Costs 3 5,000 $ 15,000
TOTAL FF&E $ 15,900
H
Estimated Estimated
Purchased Asset Cost Quantity Cost
TOTAL PURCHASED ASSET $ -
Best
Miscellaneous Fees SF # of Units Estimate/fee
azardous Materials Abatement 00 $ -
Construction Testing Fees 01 0 $ -
Specialty Consultants (fencing) 03 1 2 $ -
Contingency Fee (15%) 00 $ -
Performance Bond Fee 3100 1 $ 3,100
Contractors overhead/profit fee 3100 1 $ 3,100
TOTAL MISCELLANEOUS FEES $ 6,200
195
Capital Improvements Budget Analysis Worksheet FY25 Budget
Description/Justification: Project removes exiting asphalt shingles and underlying vapor barrier, replaces any roof decking showing
signs of deterioration due to water infiltration, and installs new roofing material and vapor barrier.
196
Project Name: City Hall Roof Replacement Project Number: PW02
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
General Fund 115,020 115,020
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
115,020 - - - - - 115,020
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Land Acquistion - -
Design 4,883 4,883
Construction 83,900 83,900
FF&E 5,313 5,313
Miscellaneous Fees 20,924 20,924
Purchased Asset - -
115,020 - - - - - 115,020
197
Project Name: City Hall Roof Replacement Project Number: PW02
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, pship
Utility needs/infrastructure
00 0
n/a n/a n/a
n/a n/a n/a
01 0 0 0
TOTAL LAND BUDGET $ -
155' x 90'
13,950 sf with 3/12 pitch
Gross SF (includes stairwells, hallways etc.)
Assignable SF
1
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech 07 0
Architecture 0 5.5 0
Engineering (MEP) 01 0
Permitting 13950 0.35 4,883
TOTAL DESIGN BUDGET $ 4,883
1
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical install
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
01 1 0
13,950 1.0 13,950
16,000 2 32,000
05 0 0
02 2 0
05 0
13,950 1 13,950
01 0 0
TOTAL CONSTRUCTION BUDGET $ 59,900
198
Project Name: City Hall Roof Replacement Project Number: PW02
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 0 400 $ -
Ext lts, flag poles, bike racks 0 200 $ -
Signage 0 500 $ -
Generator 0 25,000 $ -
Technology 0 1,000 $ -
Special Equipment Costs 0 500 $ -
TOTAL FF&E $ -
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Haz Materials Abatement 0 0 $ -
Construction Testing Fees 0 10 $ -
Specialty Consultants (fencing) 0 312 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 13950 1 $ 13,950
Contractors overhead/profit fee 13950 0.5 $ 6,975
TOTAL MISCELLANEOUS FEES $ 20,925
Estimated
Purchased Asset Estimated Cost Quantity Cost
TOTAL PURCHASED ASSET $ -
199
FS 83 Drainage and Bldg Paint Project Number: PW03
Responsible Staff:
Priority:
Reason: Safety
Lifespan/ Useful Life: 30 years Total Project Cost Estimate: 194,100$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Public Works/Fire Department Brown
Location/address: 1617 Lakside Blvd N Planned Improvement
Project Type: Improvement/Maintenance
Description/Justification: Project investigates reason for concrete drive settling behind Fire Station 83. Provides for concrete removal;
drainage pipe and junction box removal; and repair of soil base layer. Once base is stabilized, drainage components reinstalled and
concrete replaced. Project also addresses exterior of fire station, requiring repair of hardy plank siding, guttering, and painting of full
exterior.
200
Project Name: FS 83 Drainage and Bldg Paint Project Number: PW03
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
General Fund 194,100 194,100
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
194,100 - - - - - 194,100
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion - -
Design 38,750 38,750
Construction 112,850 112,850
FF&E - -
42,500 42,500
- -
194,100 - - - - - 194,100
Miscellaneous Fees
Purchased Asset
201
Project Name: FS 83 Drainage and Bldg Paint Project Number: PW03
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
00 0
n/a n/a n/a
n/a n/a n/a
0 100 0
-$
SF Cost per SF
Best
Estimate/fee
5000 7 35,000
0 5.5 0
500 2.5 1,250
5000 0.5 2,500
38,750$
SF Cost per SF
Best
Estimate/fee
5,000 11 55,000
1,000 10 10,000
08 2 0
7,800 3 25,350
Exterior paint (~7,800 sf)
02 2 0
1,000 5 5,000
5,000 3 12,500
500 10 5,000
112,850$
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Civil, Survey, Geotech, Subsurface
Mech/Elect/Plumbing
Architecture
Engineering (MEP)
Permitting
TOTAL DESIGN BUDGET
Construction
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
202
Project Name: FS 83 Drainage and Bldg Paint Project Number: PW03
# of Units Cost per Unit
Best
Estimate/fee
0 400 - $
0 200 - $
0 500 - $
0 25,000 - $
0 1,000 - $
0 500 - $
-$
SF # of Units
Best
Estimate/fee
00 - $
500 10 5,000 $
0 312 - $
00 - $
5000 5 25,000 $
5000 2.5 12,500 $
42,500$
Estimated Cost Quantity
Estimated
Cost
-$
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
TOTAL MISCELLANEOUS FEES
Purchased Asset
203
Capital Improvements Budget Analysis Worksheet FY25 Budget
Description/Justification: Project installs a dedicated 800 KW back-up generator system at the Indoor Recreation Center and a
dedicated 250 KW back-up generator system at the Police Department/Courts. Project will disconnect the existing tranfer switch at the
Police Department, from the Hargray generator, located by the Fire Department HQ. In order to maintain control of existing back-up
Hargray generator, located at the FDHQ/EOC, Hargray has agreed to turn over ownership and operational control to the City. An
official agreement will be drafted and approved through all necessary channels. Electrical design for project, funded in FY24, is
currently underway.
204
Project Name: Generator Install Var Fac Project Number: PW04
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
General Fund 241,600 241,600
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
241,600 - - - - - 241,600
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Land Acquistion - -
Design 3,300 3,300
Construction 32,300 32,300
FF&E 193,000 193,000
Miscellaneous Fees 13,000 13,000
Purchased Asset - -
241,600 - - - - - 241,600
205
Project Name: Generator Install Var Fac Project Number: PW04
Expansion
Renovation
Increase
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
00 0
n/a n/a n/a
n/a n/a n/a
01 0 0 0
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech 400 7 2,800
Architecture 0 5.5 0
Engineering (MEP) 01 0
Permitting 1000 0.5 500
TOTAL DESIGN BUDGET $ 3,300
Concrete Pad, Bollards
Gross SF (includes stairwells, hallways etc.)
Assignable SF
)
F
0 0
0 0
C
Construction SF Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical install
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management /
erosion control
Construction Administration
Landscape Budget
500 11 5,500
01 0 0
400 12 4,800
05 0 0
500 22 11,000
500 5 2,500
500 12 6,000
250 10 2,500
TOTAL CONSTRUCTION BUDGET $ 32,300
206
Project Name: Generator Install Var Fac Project Number: PW04
FF&E # of Units
Best
Cost per Unit Estimate/fee
Desks, office furniture etc 0 400 $ -
Ext Lts, flag poles, bike racks 0 200 $ -
Signage 2 500 $ 1,000
Generator 2 95,000 $ 190,000
Technology 0 1,000 $ -
Special Equipment Costs 2 1,000 $ 2,000
TOTAL FF&E $ 193,000
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Haz Materials Abatement 0 0 $ -
Construction Testing Fees 300 10 $ 3,000
Specialty Consultants (fencing) 0 312 $ -
Contingency Fee (15%) 0 0 $ -
Performance Bond Fee 500 10 $ 5,000
Contractors overhead/profit fee 500 10 $ 5,000
TOTAL MISCELLANEOUS FEES $ 13,000
Estimated
Purchased Asset Estimated Cost Quantity Cost
TOTAL PURCHASED ASSET $ -
207
Excavator Project Number: PW05
Responsible Staff:
Priority:
Reason: Future Cost Savings
Lifespan/ Useful Life: 10 years Total Project Cost Estimate: 215,000$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Public Works Brown
Location/address: 1612 Plantation Dr Planned Improvement
Project Type: Replacement
Description/Justification: This project augments existing mini-excavator with larger excavator. New equipment will have longer
reach and brush cutter attachment and will also replace aging John Deere tractor/brush cutter. Existing excavator is approaching its
useful life in hours of operation. Increased spending for maintenance and repairs being realized now. Anticipate future costs of repair
and maintenance to continue to increase. Larger, more powerful excavator will allow PWD to manage debris removal, needed
excavation o
peration and myriad of other uses to support city operations.
208
Project Name: Excavator Project Number: PW05
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance 215,000 215,000
American Rescue Plan Funds -
Grants -
Other -
Other -
215,000 - - - - - 215,000
Expenditures FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
-
215,000 215,000
215,000 - - - - - 215,000
Miscellaneous Fees
Purchased Asset
209
Project Name: Excavator Project Number: PW05
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
00 0
n/a n/a n/a
n/a n/a n/a
0 100 0
-$
SF Cost per SF
Best
Estimate/fee
07 0
0 5.5 0
01 0
0 0.5 0
-$
S.F. Cost Cost per SF
Best
Estimate/fee
01 1 0
01 0 0
08 2 0
05 0 0
02 2 0
05 0
01 2 0
01 0 0
-$
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Civil, Survey, Geotech
Architecture
Engineering (MEP)
Permitting
TOTAL DESIGN BUDGET
Construction
Site work (civil work, parking)
Demolition
New Building/vertical install
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
210
Project Name: Excavator Project Number: PW05
# of Units Cost per Unit
Best
Estimate/fee
0 400 - $
0 200 - $
0 500 - $
0 25,000 - $
0 1,000 - $
0 500 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
01 0 - $
0 312 - $
00 - $
01 0 - $
01 0 - $
-$
Estimated Cost Quantity
Estimated
Cost
200,000 1 200,000
15,000 1 15,000
0
215,000$
Desks, office furniture etc
FF&E
Performance Bond Fee
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL FF&E
Miscellaneous Fees
Haz Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
TOTAL PURCHASED ASSET
Contractors overhead/profit fee
TOTAL MISCELLANEOUS FEES
Purchased Asset
Mini-Excavator
Cutter Head
211
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: 2 Additional PW Vehicles Project Number: PW06
Department: Public Works Responsible Staff: Brown
Location/address: 1612 Plantation Dr Priority: Planned Improvement
Project Type: Improvement Reason: Future Cost Savings
Lifespan/ Useful Life: 10 years Total Project Cost Estimate: $ 102,800
Description/Justification: This project procures two (2) Ford F-150 pick up trucks to support the hiring of two additional personnel in
the Public Works Department, one in the Grounds Maintenance Division, and one for the Fleet Maintenance Division. Personnel in the
Grounds Division cannot share vehicles as each person is assigned different coverage areas throughout the city. As well, trailers are
needed to haul mowers and other equipment to jobsites, therefore, vehicles must be adequately equipped to transport equipment. This
procurement will be an add to the fleet inventory.
212
Project Name: 2 Additional PW Vehicles Project Number: PW06
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Debt Issuance 102,800 102,800
Other -
Other -
102,800 - - - - - 102,800
FY30 &
Expenditures FY25 FY26 FY27 FY28 FY29 Beyond TOTAL
Land Acquistion - -
Design - -
Construction - -
FF&E - -
Miscellaneous Fees - -
Purchased Asset 102,800 102,800
102,800 - - - - - 102,800
213
Expansion
Renovation
Increase
Best
Land Acquistion SF Cost Per SF Estimate/fee
Existing asset
Joint venture, grant, partnership
Utility needs/infrastructure
00 0
n/a n/a n/a
0 100 0
TOTAL LAND BUDGET $ -
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Engineering (MEP)
Permitting
07 0
01 0
0 0.5 0
TOTAL DESIGN BUDGET $ -
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
01 1 0
01 0 0
08 2 0
05 0 0
02 2 0
05 0
01 2 0
01 0 0
TOTAL CONSTRUCTION BUDGET $ -
Gross SF (includes stairwells, hallways etc.)
Assignable SF
)
F
0 0
0 0
214
Project Name: 2 Additional PW Vehicles Project Number: PW06
FF&E # of Units Cost per Unit
Best
Estimate/fee
Desks, office furniture etc 04 0 0 $ -
Ext Lights, flag poles, bike racks 02 0 0 $ -
Signage 0 500 $ -
Generator 0 25,000 $ -
Technology 0 1,000 $ -
Special Equipment Costs 0 500 $ -
TOTAL FF&E $-
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 00 $ -
Construction Testing Fees 0 10 $ -
Specialty Consultants (fencing) 03 1 2 $ -
Contingency Fee (15%) 0 0 $ -
Contractors overhead/profit fee 0 10 $ -
TOTAL MISCELLANEOUS FEES $ -
Purchased Asset
Estimated
Cost Quantity Estimated Cost
Mini-Excavator
Cutter Head
51,400 2 102,800
00 0
0
TOTAL PURCHASED ASSET $ 102,800
215
New Software Suite Project Number: PW07
Responsible Staff:
Priority:
Reason: Future Cost Savings
Lifespan/ Useful Life: 10 years Total Project Cost 133,615$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Public Works Kimbrell/Brown
Location/address: 1612 Plantation Dr Planned Improvement
Project Type: Improvement
Description/Justification: This project procures two OpnGov software for asset management in Public Works. The
data will cover assets related to buildings, roads, stormwater, parks & recreation, and walkability.The software will
enable Public Works to more efficiently plan, execute, and monitor asset management processes and to report on assets'
physical condition. Recommended funding from Tech Software 001-14-914004.
216
Project Name: New Software Suite Project Number: PW07
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 133,615 133,615
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
133,615 - - - - - 133,615
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
67,735 67,735
65,880 65,880
133,615 - - - - - 133,615
Software
Implemantation Services
217
Project Name: New Software Suite Project Number: PW07
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
n/a n/a n/a
n/a n/a n/a
0 100 0
-$
SF Cost per SF
Best
Estimate/fee
07 0
0 5.5 0
01 0
0 0.5 0
-$
S.F. Cost Cost per SF
Best
Estimate/fee
01 1 0
01 0 0
08 2 0
05 0 0
02 2 0
050
01 2 0
01 0 0
-$
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
TOTAL DESIGN BUDGET
Construction
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
218
Project Name: New Software Suite Project Number: PW07
# of Units
Cost per
Unit
Best
Estimate/fee
0 400 - $
0 200 - $
0 500 - $
0 25,000 - $
0 1,000 - $
0 500 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
01 0 - $
0 312 - $
00 - $
01 0 - $
01 0 - $
-$
Estimated
Cost Quantity
Estimated
Cost
67,735 1 67,735
65,880 1 65,880
0
133,615$
Desks, office furniture etc
FF&E
Performance Bond Fee
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL FF&E
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
TOTAL PURCHASED ASSET
Contractors overhead/profit fee
TOTAL MISCELLANEOUS FEES
Purchased Asset
Software
Professional Services (one-time)
219
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: JuJu Playground Phase 2
Department: PRT
Location/address: 205 Main Street
Project Type: Expansion
Lifespan/ Useful Life: 25
Project Number: PRT01
Responsible Staff: McMahon/ Combs
Priority: Critical
Reason: finalize planned project
Total Project Cost Estimate:
$
1,097,000
Description/Justification: The JuJu Hutson approved Master Plan was adopted in 2018. Overall project was phased into
three seperate phases to includeproject was approved in 2019 by CC and phased into three sections. Phase 1 was
completed in 2020 with Phase 2 approved for take off in the 21FY with funding from ARP designated. Phase three
finalizes the Playground "Park" phase with planned upgrade; landscaping, fencing, sidewalk/surround trail, defined
gateway entrance to play area, large picnic shelter/bathrooms (bathrooms won't be online until pump station is online)
220
Project Name: JuJu Playground Phase 2 Project Number: PRT25-001
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund
American Rescue Plan Funds
635,000
-
635,000
Grants
Local ATAX
462,000
-
462,000
Other -
1,097,000 - - - - - 1,097,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond
TOTAL
Land Acquistion 12,000 12,000
Design 19,000 19,000
Construction 896,000 896,000
FF&E 30,000 30,000
Miscellaneous Fees
Purchased Asset
140,000 140,000
-
1,097,000 - - - - - 1,097,000
221
Project Name: JuJu Playground Phase 2 Project Number: PRT01
Renovation
Expansion Increase
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
00 0
00 0
00 0
0 12,000
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface 0 0 8,000
Architecture 0 0 5,500
Engineering (MEP) 0 0 5,500
Permitting 0 0
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
Construction Administration
Landscape Budget
0 0 20,000
0 0 12,000
0 0 750,000
00 0
0 0 12,000
0 0 12,000
0 0 5,000
0 0 85,000
TOTAL CONSTRUCTION BUDGET $ 896,000
Gross SF (includes stairwells, hallways etc.)
0
0
222
Project Name: JuJu Playground Phase 2 Project Number: PRT01
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 00 $ -
Ext Lights, flag poles, bike racks 0 0 $ 20,000
Signage 0 0 $ 5,000
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ 5,000
TOTAL FF&E $ 30,000
Best
Miscellaneous Fees SF Cost # of Units Estimate/fee
Hazardous Materials Abatement 00 $ -
Construction Testing Fees 00 $ -
Specialty Consultants (fencing) 0 0 $ 50,000
Contingency Fee (15%) 0 0 $ 90,000
Performance Bond Fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $ 140,000
Purchased Asset
Estimated
Cost Quantity Estimated Cost
00 0
00 0
00 0
TOTAL PURCHASED ASSET $-
223
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: JuJu Phase 3 Parking Lots (2)
Department: PRT
Location/address: 205 Main Street
Project Number: PRT02
Responsible Staff: McMahon/ Brown/Combs
Priority: improved parking
existing lot
Lifespan/ Useful Life: 35 years
existing
lotProject Type: Expansion & Renovation of
Reason: maxed out parking, need
Estimate:
more
$
984,000
Description/Justification: This project is needed to complete the final phase of the overall JuJu Park Master Plan project and
includes portion of the Richard Gray Recreation Complex Park Master Plan to upgrade exisiting parking and add additional
parking. The RG Complex is at capacity for growth and additional parking is needed to sustain the growth for patrons.
224
Project Name: JuJu Phase 3 Parking Lots (2) Project Number: PRT02
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 15,000 721,000 736,000
Debt Issuance -
American Rescue Plan Funds -
Local H Tax 342,000 629,700 971,700
Other -
357,000 1,350,700 - - - - 1,707,700
FY30 &
Expenditures FY25 FY26 FY27 FY28 FY29 Beyond TOTAL
Land Acquistion 25,000 25,000
Design 32,000 5,000 37,000
Construction 300,000 900,000 1,200,000
FF&E 151,200 151,200
Miscellaneous Fees 294,500 294,500
Purchased Asset -
357,000 1,350,700 - - - - 1,707,700
225
Project Name: JuJu Phase 3 Parking Lots (2) Project Number: PRT02
Expansion
Renovation
Increase
Land Acquistion SF Cost Per SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
000
000
000
0 0 25,000
TOTAL LAND BUDGET $ 25,000
Design
Best
SF Cost per SF Estimate/fee
Civil, Survey, Geotech, Subsurface 0 0 22,000
Architecture 0 0 0
Engineering (MEP) 0 0 15,000
Permitting 0 0 0
TOTAL DESIGN BUDGET $ 37,000
Construction S.F. Cost Cost per SF
Best
Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/ erosion
Construction Administration
Landscape Budget
0 0 50,000
0 0 25,000
0 0 900,000
0 0 180,000
000
0 0 15,000
0 0 5,000
0 0 25,000
TOTAL CONSTRUCTION BUDGET $ 1,200,000
226
Project Name: JuJu Phase 3 Parking Lots (2) Project Number: PRT02
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ 150,000
Signage 0 0 $ 1,200
Generator 0 0 $ -
Technology 00 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ 151,200
Miscellaneous Fees SF Cost # of Units
Best
Estimate/fee
Hazardous Materials Abatement 0 0 $ 13,000
Construction Testing Fees 0 0 $ 6,500
Specialty Consultants (fencing) 0 0 $ 60,000
Contingency Fee (15%) 0 0 $ 150,000
Performance Bond Fee 0 0 $ 65,000
Contractors overhead/profit fee 7% 0 0 $ -
TOTAL MISCELLANEOUS FEES $ 294,500
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
000
000
000
TOTAL PURCHASED ASSET $-
227
Project Number: PRT03
Responsible Staff:
Priority:
Reason: End of Life
Lifespan/ Useful Life: 20 years Total Project Cost 14,560,000$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: PRT McMahon/ Combs
Location/address: 205 Main Street Upgrade exisiting amenities
Project Type: Expansion & Renovation of
existing
Richard Gray Rec Plex
MP Improvements
Description/Justification: Richard Gray Master Plan is a $9-$15 million dollar improvement plan that CC adopted (2019) aimed at
improving existing amenities within the complex as well as adding new features that will help provide additional services and amenities
for the growing population of the City over the next 10-15 years. Improvements include street lighting, street scaping, trails, new fields,
road resurfacing, new parking, parking improvements, gateway entrances, fencing, shelters and more. As the City sees record growth,
the Commnity park has seen an influx in use and will need to improve to keep up with the current use as well as expansion efforts. The
City's adopted master plan addresses these issues and plans for the needs addressed by the community within the plan.
228
Project Name: Richard Gray Rec Plex MP Improvements Project Number: PRT03
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 500,000 500,000 6,000,000 6,000,000 13,000,000
Developer Agreement Fees 60,000 150,000 150,000 1,000,000 1,360,000
Debt Issuance -
American Rescue Plan Funds -
Grants 100,000 100,000 200,000
Other -
Other -
60,000 750,000 750,000 1,000,000 6,000,000 6,000,000 14,560,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design 5,000 5,000
#REF! 55,000 55,000
FF&E -
750,000 750,000 1,000,000 6,000,000 6,000,000 14,500,000
-
60,000 750,000 750,000 1,000,000 6,000,000 6,000,000 14,560,000
Miscellaneous Fees
Purchased Asset
229
Project Name: Richard Gray Rec Plex MP Improvements Project Number: PRT03
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
00
-$
SF Cost per SF
Best
Estimate/fee
00
00 0
0 0 5,000
00
5,000$
Existing asset
Gross SF (includes stairwells, hallwa
ys etc.)
Assignable SF
Land Acquistion
Architecture
Engineering (MEP)
Permitting
TOTAL DESIGN BUDGET
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Civil, Survey, Geotech, Subsurface
230
Project Name: Richard Gray Rec Plex MP Improvements Project Number: PRT03
# of Units
Cost per
Unit
Best
Estimate/fee
00 - $
00 - $
0 0 55,000 $
00 - $
00 - $
00 - $
55,000$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
00
00 - $
00 - $
-$
Estimated
Cost Quantity
Estimated
Cost
000
000
000
-$
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
TOTAL MISCELLANEOUS FEES
Purchased Asset
231
Alta Bike Ped Trailways Project Number: PRT04
Responsible Staff:
Priority:
Reason:
Lifespan/ Useful Life: 25-30 Total Project Cost 4,821,000$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: PRT McMahon/ Combs
Location/address: Hardeeville Create greenways/trails
Project Type: New construction No greenway system
Description/Justification: Seeing the explosion of future growth for the City and not having a greenway in place for
connectivity, City Council requested a bid package be released for consultation which resulted in the 2017 Alta Plan being
adopted by the CC. The Master Plan encompasses five main trails that provide recreational opportunities and connectivity
enhancing the quality of life. As the City grows, connectivity is needed. As more planned development and growth explode in
the City, the need for connectivity and greenways becomes paramount to community connection.
232
Project Name: Alta Bike Ped Trailways Project Number: PRT04
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants 4,821,000 4,821,000
Other -
Other -
- - - - - 4,821,000 4,821,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Construction 4,821,000 4,821,000
FF&E -
-
-
- - - - - 4,821,000 4,821,000
Miscellaneous Fees
Purchased Asset
233
Project Name: Alta Bike Ped Trailways Project Number: PRT04
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
000
-$
S.F. Cost Cost per SF
Best
Estimate/fee
0 0 4,821,000
000
000
000
000
000
000
000
4,821,000$
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
Mech/Elect/Plumbing
Construction
Site work (civil work, parking)
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Demolition
New Building/vertical installation
Remodel of existing space
Storm water/site management/ erosion
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
234
Project Name: Alta Bike Ped Trailways Project Number: PRT04
# of Units
Cost per
Unit
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
Estimated
Cost Quantity
Estimated
Cost
000
000
000
-$
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
TOTAL MISCELLANEOUS FEES
Purchased Asset
235
Project Number: PRT05
Responsible Staff:
Priority:
Reason:
Lifespan/ Useful Life: 30 Total Project Cost 250,000$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: PRT Combs
Location/address: Hardeeville
Project Type: Master planning long range
PRT Master Plan
(Comprehensive/
longrange strategy)
Description/Justification: The City of Hardeeville is the fastest growing City in SC and has growing recreational needs to meet the demands of
the City throughout its borders. Having a Master Plan in place to address comprehensive, long-range strategy for the creation, optimization, and
maintenance of the Community's assests. In addition, the plan helps to establish the long-range vision in accordance with the City's adopted
Comprehensive plan. It also allows the department to prioritize and build a budget for CIP. Having the PRT Master Plan in place will allow the
department to plan strategically while assessing the recreational needs and future impacts for parks trails, amenities, open space and more. The
PRT Master Plan can also be a critical tool in how we deal with new development and impact fees for these services or amenities.
236
Project Name: PRT Master Plan Project Number: PRT05
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 100,000 100,000
Developer Agreement Fees 150,000 150,000
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
250,000 - - - - 250,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
#REF! 250,000 250,000
Construction -
FF&E -
-
- 250,000 - - - - 250,000
Purchased Asset
237
Project Name: PRT Master Plan Project Number: PRT05
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
000
-$
S.F. Cost Cost per SF
Best
Estimate/fee
000
000
000
000
000
000
000
000
-$
Existing asset
Gross SF (includes stairwells, hallwa
ys etc.)
Assignable SF
Land Acquistion
Mech/Elect/Plumbing
Construction
Site work (civil work, parking)
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Demolition
New Building/vertical installation
Remodel of existing space
Storm water/site management/ erosion
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
238
Project Name: PRT Master Plan Project Number: PRT05
# of Units
Cost per
Unit
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
Estimated
Cost Quantity
Estimated
Cost
000
000
000
-$
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
TOTAL MISCELLANEOUS FEES
Purchased Asset
239
Project Number: PRT06
Priority:
Reason:
Lifespan/ Useful Life: 50 years Total Project Cost 304,750$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: PRT McMahon/ Combs/Brown
Location/address: 285 John Smith Road add additional lot/McTeer
Road entrance
Project Type: Expansion of existing
Rec Center Parking Lot
additon
growth demands more
parking
Description/Justification: Complete rear drive and parking area from McTeer area at the Recreation Center; requested for FY21
CIP, moved to FY 22, then FY23. Drive and parking area paving were removed from project due to increased cost for site work
design phase of the project, earthwork was not removed. Planned completion immediately after the rest of the project is complete.
NOTE: Drainage is an issue; site plan has not been fixed with engineers.
Responsible Staff:
240
Project Name: Rec Center Parking Lot Project Number: PRT06
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds 100,000 100,000
Grants -
Local ATAX 300,000 300,000
Other -
400,000 - - - - - 400,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion 15,000 15,000
Mechanical 20,000 20,000
Construction 305,000 305,000
FF&E -
60,000 60,000
-
400,000 - - - - - 400,000
Miscellaneous Fees
Purchased Asset
241
Project Name: Rec Center Parking Lot Project Number: PRT06
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
0 0 15,000
15,000$
S.F. Cost Cost per SF
Best
Estimate/fee
0 0 205,000
0 0 50,000
000
000
0 0 15,000
0 0 5,000
0 0 2,000
0 0 28,000
305,000$
Existing asset
Gross SF (includes stairwells, hallwa
ys etc.)
Assignable SF
Land Acquistion
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Demolition
New Building/vertical installation
Remodel of existing space
Storm water/site management/ erosion
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
Mech/Elect/Plumbing
Construction
Site work (civil work, parking)
242
Project Name: Rec Center Parking Lot Project Number: PRT06
# of Units
Cost per
Unit
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
0 0 60,000 $
00 - $
00 - $
60,000$
Estimated
Cost Quantity
Estimated
Cost
000
000
000
-$
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
TOTAL MISCELLANEOUS FEES
Purchased Asset
243
Project Number: PRT07
Responsible Staff:
Priority:
Reason:
Lifespan/ Useful Life: 50 years Total Project Cost 30,000$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: PRT McMahon/ Brown/Combs
Location/address: 205 Main Street create traffic calming
Project Type: Expansion & Renovation of
existing
Traffic Calming Jim
Hatter Way
needed for growth
Description/Justification: Installation of traffic calming measures at the Richard Gray Recreation Complex Park to include
speed humps, bollards, fencing and signage. This will help to reduce the speed of traffic in the complex
244
Project Name: Traffic Calming Jim Hatter Way Project Number: PRT07
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 15,000 15,000 30,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
- 15,000 15,000 - - - 30,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
#REF! 5,000 5,000
Construction 10,000 15,000 25,000
FF&E -
-
-
- 15,000 15,000 - - - 30,000
Miscellaneous Fees
Purchased Asset
245
Project Name: Traffic Calming Jim Hatter Way Project Number: PRT07
Expansion
Renovation
Increase
00
00
SF Cost Per SF
Best
Estimate/fee
000
000
000
000
-$
S.F. Cost Cost per SF
Best
Estimate/fee
00
000
000
000
000
000
000
000
-$
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
Mech/Elect/Plumbing
Construction
Site work (civil work, parking)
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Demolition
New Building/vertical installation
Remodel of existing space
Storm water/site management/
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
246
Project Name: Traffic Calming Jim Hatter Way Project Number: PRT07
# of Units
Cost per
Unit
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
SF Cost # of Units
Best
Estimate/fee
00 - $
00 - $
00 - $
00 - $
00 - $
00 - $
-$
Estimated
Cost Quantity
Estimated
Cost
000
000
000
-$
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
TOTAL MISCELLANEOUS FEES
Purchased Asset
247
Capital Improvements Budget Analysis Worksheet FY25 Budget
Responsible Staff:
Expansion &
Description/Justification: Construction of new parking areas adjacent to the basketball courts per the
masterplan. Included in the current masterplan for the Richard Gray complex to help parking congestion.
248
Project Name: Richard Gray Complex basketball parking & sidewalk Project Number: PRT08
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond
TOTAL
General Fund
Developer Agreement Fees 300,000 492,000
-
792,000
Local HTAX 192,000 192,000
Other -
492,000 492,000 - - - - 984,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion 3,000 3,000 6,000
Design 11,500 11,500 23,000
Construction 402,000 402,000 804,000
FF&E 4,000 4,000 8,000
Miscellaneous Fees 71,500 71,500 143,000
Purchased Asset
492,000 492,000 - - - -
-
984,000
249
Project Name: Richard Gray Complex basketball parking & sidewalk Project Number: PRT08
Expansion
Renovation
Increase
0 0
0 0
Land Acquistion SF
Cost Per
SF
Best
Estimate/fee
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
0 0 0
0 0 0
0 0 0
0 0 6,000
TOTAL LAND BUDGET $ 6,000
Design SF
Cost per
SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0 0 15,000
0 0 0
0 0 8,000
0 0 0
TOTAL DESIGN BUDGET $ 23,000
Cost per Best
Construction S.F. Cost SF Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
Construction Administration
Landscape Budget
0 0 25,000
0 0 5,000
0 0 731,000
0 0 0
0 0 8,000
0 0 15,000
0 0 0
0 0 20,000
TOTAL CONSTRUCTION BUDGET $ 804,000
Gross SF (includes stairwells, hallways
Assignable SF
250
Project Name: Richard Gray Complex basketball parking & sidewalk Project Number: PRT08
FF&E # of Units
Cost per
Unit
Best
Estimate/fee
Desks, office furniture etc 0 0 $ -
Ext Lights, flag poles, bike racks 0 0 $ 8,000
Signage 0 0 $ -
Generator 0 0 $ -
Technology 0 0 $ -
Special Equipment Costs 0 0 $ -
TOTAL FF&E $ 8,000
Best
Miscellaneous Fees SF Cost # of Units Estimate/fee
Hazardous Materials Abatemen t 0 0 $ -
Construction Testing Fees 0 0 $ 25,000
Specialty Consultants (fencing) 0 0 $ 22,000
Contingency Fee (15%) 0 0 $ 96,000
Performance Bond Fee 0 0 $ -
Contractors overhead/profit fee 0 0 $ -
TOTAL MISCELLANEOUS FEES $ 143,000
Purchased Asset
Estimated
Cost Quantity
Estimated
Cost
0 0 0
0 0 0
0 0 0
TOTAL PURCHASED ASSET $ -
251
Project Number: PRT09
Responsible Staff:
Priority:
Reason:
Lifespan/ Useful Life: 50 years Total Project Cost 20,000,000
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: PRT McMahon/ Combs
Location/address: TBD East Argent
Low-no
infrastructure/public
accessway
Project Type: Expansion & Renovation of
existing
Passive rec park
growth/ecotourism
EA 1330 Conservation
Description/Justification: EA 1330 was gifted to the City in 2019; legally turned over in 2020. Realizing that Hardeeville is
a growing municipality in the East Argent section of the City and natural protected open areas are dwendling, this conservation
easement was a welcomed treasure to protecting and preserving lowcountry life while providing for new outdoor recreational
options for trails (bike/ped). as the East Argent corridor expands, recreational provisions are on the rise. This large 1330 acre
natural resource wonder will provide for all of Hardeeville a protected natural resource with several outdoor recreational
opportunities.
252
Project Name: EA 1330 Conservation Par k Project Number: PRT09
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 85,000 85,000 170,000
Debt Issuance -
American Rescue Plan Funds -
Other 19,830,000 19,830,000
Other -
- 85,000 85,000 - - 19,830,000 20,000,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Master Plan 85,000 85,000 170,000
Construction -
FF&E -
19,830,000 19,830,000
-
- 85,000 85,000 - - 19,830,000 20,000,000
Miscellaneous Fees
Purchased Asset
253
Project Name: EA 1330 Conservation Par k Project Number: PRT09
Expansion
Renovation
Increase
--
--
SF Cost Per SF
Best
Estimate/fee
-- -
- - -
- - -
- - -
-
S.F. Cost Cost per SF
Best
Estimate/fee
-- -
- --
- - -
- - -
- - -
- - -
- - -
- - -
-
Existing asset
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
Mech/Elect/Plumbing
Construction
Site work (civil work, parking)
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Demolition
New Building/vertical installation
Remodel of existing space
Storm water/site management/ erosion
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
254
Project Name: EA 1330 Conservation Par k Project Number: PRT09
# of Units
Cost per
Unit
Best
Estimate/fee
- - -
- - -
- - -
- - -
- - -
- - -
-
SF Cost # of Units
Best
Estimate/fee
- - -
- - -
- - -
- - -
- - -
- - -
-
Estimated
Cost Quantity
Estimated
Cost
- - -
- - -
- - -
-
TOTAL FF&E
FF&E
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
TOTAL PURCHASED ASSET
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee 7%
TOTAL MISCELLANEOUS FEES
Purchased Asset
255
Project Name: Randall Street Parking Lot Project Number: PRT10 (old church site)
Department: PRT Responsible Staff: McMahon/ Brown/Combs
Location/address: 205 main Street Priority: create more parking for
overflow
Project Type: Expansion & Renovation of Reason: need parking, at capacity existing
Lifespan/ Useful Life: 50 years Total Project Cost $ 978,000
Capital Improvements Budget Analysis Worksheet FY25 Budget
Description/Justification: Additional parking for RG RecPlex that allows for more needed parking for the complex to
accomodate the growing needs of the RG RecPLex
256
Project Name: Randall Street Parking Lot (old church site) Project Number: PRT10
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees 364,000 614,000 978,000
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
364,000 614,000 - - - - 978,000
FY30 &
Expenditures FY25 FY26 FY27 FY28 FY29 Beyond TOTAL
#REF! -
Design 75,000 75,000
Construction 289,000 614,000 903,000
FF&E -
Miscellaneous Fees -
Purchased Asset -
364,000 614,000 - - - - 978,000
257
Project Name: Randall Street Parking Lot (old church site) Project Number: PRT10
Expansion
Renovation
Increase
0 0
0 0
Design SF Cost per SF
Best
Estimate/fee
Civil, Survey, Geotech, Subsurface
Architecture
Engineering (MEP)
Permitting
0 0 10,000
00 0
0 0 65,000
00 0
TOTAL DESIGN BUDGET $ 75,000
Best
Construction S.F. Cost Cost per SF Estimate/fee
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
Construction Administration
Landscape Budget
0 0 15,000
0 0 10,000
0 0 842,000
000
000
0 0 21,000
000
0 0 15,000
TOTAL CONSTRUCTION BUDGET $ 903,000
Gross SF (includes stairwells, hallways etc.)
Assignable SF
258
Project Name: Randall Street Parking Lot (old church site) Project Name: PRT10
Cost per Best
FF&E # of Units Unit Estimate/fee
Desks, office furniture etc
Ext Lights, flag poles, bike racks
Signage
Generator
Technology
Special Equipment Costs
00 $ -
00 $ -
00 $ -
00 $ -
00 $ -
00 $ -
TOTAL FF&E $-
Best
Miscellaneous Fees SF Cost # of Units Estimate/fee
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants (fencing)
Contingency Fee (15%)
Performance Bond Fee
Contractors overhead/profit fee
00 $ -
00 $ -
00 $ -
00 $ -
00 $ -
00 $ -
TOTAL MISCELLANEOUS FEES $-
Estimated Estimated
Purchased Asset Cost Quantity Cost
000
000
000
TOTAL PURCHASED ASSET $-
259
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Whyte Hardee Blvd MP Project Number: PLN01 Implementation
Department: Planning Responsible Staff: Snowden
Location/address: WHB Priority: High
Project Type: Parking & Traffic Calming Reason: Revitalization needed
Lifespan/ Useful Life: 50 years Total Project Cost $ 125,000
Description/Justification: This project is needed to create a walkable downtown environment including on street parking,
traffic calming effects, trees and streetscapes, wider sidewalks, curb bulb-outs amd high visibility crosswalks. The scope
would revitalize/improve approx 2,500 lineal feet of the downtown district of the Whyte Hardee District
masterplan.
260
Project Name: Whyte Hardee Blvd MP Implementation Project Number: PLN01
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 25,000 150,000 200,000 250,000 300,000 925,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds 100,000 100,000
Grants -
Other -
Other -
125,000 150,000 200,000 250,000 300,000 - 1,025,000
FY30 &
Expenditures FY25 FY26 FY27 FY28 FY29 Beyond TOTAL
Land Acquistion -
Design 115,000 100,000 100,000 315,000
Construction 150,000 200,000 150,000 200,000 700,000
FF&E -
Miscellaneous Fees 10,000 10,000
Purchased Asset -
125,000 150,000 200,000 250,000 300,000 - 1,025,000
261
New Softare Suite Project Number: PLN02
Planning & Building Responsible Staff: Snowden/Oliver
Priority:
Reason: Update required
75,183$
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department:
Location/address: N/A High
Project Type: Software for efficiency in
processes
Lifespan/ Useful Life: 5 years Total Project Cost
Description/Justification: This project is needed to fund the Building, Planning & Code Enforcement portion of city-
wide software update. Necessary to centralize file management, increase efficiency and should be user-firendly for staff
and the public. The ability to work virtually with your citizens, business owners and contractors is critical.
262
Project Name: Software Project Number: PLN02
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 75,183 75,183
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
75,183 ----- 75,183
Expenditures FY24 FY25 FY26 FY27 FY28
FY30 &
Beyond TOTAL
Land Acquistion -
Design
Construction
FF&E
16,863 16,863
58,320 58,320
75,183 ----- 75,183
Software
Implemantation Services
263
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name: Comprehensive Plan Update Project Number: PLN03
Department: Planning Responsible Staff: Snowden
Location/address: N/A Priority: High
Project Type: State Regulation Compliance Reason: Update required
Lifespan/ Useful Life: 5 years Total Project Cost Estimate: $ 125,000
Description/Justification: This project is needed to fund the Comprehsive Plan Update. SC State law requires that the Plan be
reviewed every 5 years and updated every 10 years. This requirement ensures the legality of the City's Zoning Standards.
264
Project Name: Comprehensive Plan Update Project Number: PLN03
Funding Sources FY25 FY26 FY27 FY28 FY29 FY30 & Beyond TOTAL
General Fund 125,000 125,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
125,000 - - - - - 125,000
Expenditures FY24 FY25 FY26 FY27 FY28 FY29 & Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
Consultant Fees 125,000 125,000
Purchased Asset -
125,000 - - - - - 125,000
265
Recreation Cameras Project Number: CIDS01
Responsible Staff:
Priority:
Reason: City Council Directive
Description/Justification: This project is needed to provide space for the Media Department. City Council has directed
the City Manager to identify a permanent space for Media staff and related studio space. Project entails the demolition and
modification of space in old City Hall.
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Media McMahon/ Brown/
Singleton
Lifespan/ Useful Life: 15 years Total Project Cost 89,000$
Location/address: xx Main Street Improve Service
Project Type: Improvement
266
Project Name: Recreation Project Number: CIDS01
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 89,000 89,000
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
89,000 ----- 89,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
-
89,000 89,000
89,000 ----- 89,000
Miscellaneous Fees
Purchased Asset
267
Project Name: Recreation Project Number: CIDS01
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
-$
S.F. Cost # of Units
Best
Estimate/fee
0
-$
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Survey, Geotech, Subsurface
Land Acquistion
Architecture
Engineering
Permitting
TOTAL DESIGN BUDGET
268
Project Name:ation Cameras Project Number: CIDS01
S.F. Cost # of Units
Best
Estimate/fee
-$
Estimated
Cost Quantity
Estimated
Cost
69,000
20,000
89,000$ TOTAL PURCHASED ASSET
Contractors overhead/profit fee
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants
Contingency Fee (15%)
Performance Bond Fee
TOTAL MISCELLANEOUS FEES
Purchased Asset
Verkada Hardware
Labor
269
Digital Wall Project Number: CIDS02
Responsible Staff:
Priority:
Reason: City Council Directive
Description/Justification: This project would allow for more info to be distributed to visitors at City Hall. This has the
ability for the citizen to engage. This would also replace our wall of honor which will allow for digital display of the
honorees both present and past also allowing for history and bios to be injected as well.
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Media McMahon/ Brown/
Singleton
Lifespan/ Useful Life: 15 years Total Project Cost 94,238$
Location/address: xx Main Street Improve Service
Project Type: Improvement
270
Project Name: Digital Wall Project Number: CIDS02
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 94,238 94,238
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
94,238 ----- 94,238
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
-
94,238 94,238
94,238 ----- 94,238
Miscellaneous Fees
Purchased Asset
271
Project Name: Digital Wall Project Number: CIDS02
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
-$
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
-$
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Survey, Geotech, Subsurface
Land Acquistion
Architecture
Engineering
Permitting
TOTAL DESIGN BUDGET
272
Project Name: Digital Wall Project Number: CIDS02
S.F. Cost # of Units
Best
Estimate/fee
-$
Estimated
Cost Quantity
Estimated
Cost
38,488 2 76,976
822 21 17,262
94,238$ TOTAL PURCHASED ASSET
Contractors overhead/profit fee
Miscellaneous Fees
Hazardous Materials Abatement
Construction Testing Fees
Specialty Consultants
Contingency Fee (15%)
Performance Bond Fee
TOTAL MISCELLANEOUS FEES
Purchased Asset
Samsung Wall in One
SA and Installation
273
Multi Lingual Kiosks Project Number: CIDS03
Responsible Staff:
Priority:
Reason:
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Media IT / Media / Gen Gov
Lifespan/ Useful Life: 5 years Total Project Cost 19,889$
Location/address: City Hall, Building, PD,
Court Improve Service
Project Type: Citizen Engagement
Description/Justification: This project is needed to provide multi lingual communication with the citizens. City Council
has directed the City Manager to identify a solution to better engage with our citizens of different nationalities. This will
allow for updates to City announcements, access to multilingual forms and communication.
City Council Initiative / HBAL
274
Multi Lingual Kiosks Project Number: CIDS03
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 19,889 19,889
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
Other -
Other -
19,889 ----- 19,889
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
#REF! -
-
19,889 19,889
19,889 ----- 19,889
Project Name:
#REF!
Purchased Asset
275
Multi Lingual Kiosks Project Number: CIDS03
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
-$
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
-$
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Existing asset
New purchase
Joint venture, grant, partnership
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Survey, Geotech, Subsurface
Architecture
Engineering
Permitting
TOTAL DESIGN BUDGET
Land Acquistion
Project Name:
276
Multi Lingual Kiosks Project Number: CIDS03
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
0
0
0
0
Site work (civil work, parking)
Demolition
Construction
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
Project Name:
277
Outdoor Signage Project Number: CIDS04
Responsible Staff:
Priority:
Reason: City Council Directive
Lifespan/ Useful Life: 15 years Project Cost Estimate: $200,000
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: Media McMahon/ Brown/
Singleton
Location/address: Main Street/ WHB Improve Service
Project Type: Improvement
In an effort to present information and add another avenue for communicating with the citizens and keeping them
more informed to align with some of the goals and objectives of City Council, we feel that digital signage is a good
avenue to harness. This will allow for immediate relaying of city info and events to not only the public but also to
visitors to the area. We can address the MZDO and appropriate locations for the signage. The possibility of using
ATAX dollars should be available as we will be publishing events offerings that can / will appeal to citizens and
visitors alike.
278
Outdoor Signage Project Number: CIDS04
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund -
Developer Agreement Fees -
Debt Issuance -
American Rescue Plan Funds -
Grants -
ATAX 100,000 100,000 200,000
Other -
100,000 100,000 ---- 200,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction 75,000 75,000 150,000
FF&E -
Miscellaneous Fees 25,000 25,000 50,000
Purchased Asset -
100,000 100,000 ---- 200,000
Project Name:
279
Outdoor Signage Project Number: CIDS04
S.F. Cost # of Units
Best
Estimate/fee
0
0
0
0
$-
S.F. Cost # of Units
Best
Estimate/fee
0
$-
Joint venture, grant, partnership
Gross SF (includes stairwells, hallways etc.)
Assignable SF
Land Acquistion
Existing asset
New purchase
Architecture
Engineering
Permitting
TOTAL DESIGN BUDGET
Utility needs/infrastructure
TOTAL LAND BUDGET
Design
Survey, Geotech, Subsurface
Project Name:
280
Project Name: Outdoor Signage Project Number: CIDS-25-004
S.F. Cost # of Units
Best
Estimate/fee
-
-
-
-
-
-
-
-
$-
Construction
Site work (civil work, parking)
Demolition
New Building/vertical installation
Remodel of existing space
Mech/Elect/Plumbing
Storm water/site management/
erosion control
Construction Administration
Landscape Budget
TOTAL CONSTRUCTION BUDGET
281
Digital Documentation / Storage Project Number: CIDS05
Responsible Staff:
Priority:
Reason: Efficiency
Capital Improvements Budget Analysis Worksheet FY25 Budget
Project Name:
Department: IT / Gen Gov IT Staff
Implementing digital documentation in Hardeeville, SC, is a strategic move for efficiency, transparency, and cost
savings. This shift from paper to digital enhances accessibility, collaboration, and citizen services. It ensures data
security, compliance, and disaster recovery while contributing to environmental sustainability. With improved
reporting and scalability, the City can make informed decisions and remain future-ready. This investment signals
a commitment to modernization, setting the stage for enhanced municipal operations and improved citizen
experiences.
Location/address: xx Main Street Improve Service
Project Type: Improvement
Lifespan/ Useful Life: Perpetual Total Project Cost
Estimate: $120,000
282
Project Name: Digital Documentation / Storage Project Number: CIDS05
Funding Sources FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
General Fund 120,000 120,000
per Agreement Fees -
Debt Issuance -
Rescue Plan Funds -
Grants -
ATAX -
Other -
120,000 ----- 120,000
Expenditures FY25 FY26 FY27 FY28 FY29
FY30 &
Beyond TOTAL
Land Acquistion -
Design -
Construction -
FF&E -
100,000 100,000
20,000 20,000
120,000 ----- 120,000
Software Purchase
Scanning to Bring Current
283
284
APPENDIX
THE BUDGET ORDINANCE is attached on the following pages.
Attachment A
General Fund Revenues
Taxes
REAL PROPERTY TAXES 10,879,353
VEHICLE TAXES 910,000
DELINQUENT TAXES 200,000
HOMESTEAD EXEMPTION 500,000
PERSONAL PROPERTY TAX 8,000
MOTOR CARRIER APPORTIONMENT 140,000
12,637,353
Local Option Sales Tax
LOC OPT SALE TAX- PROP TX 1,600,000
LOC OPT SALE TAX- REV FUND 780,000
2,380,000
Special Assessments
REPLACEMENT METAL FILOT 5,050
5,050
Intergovernmental
MASC TAX COLLECTIONS 1,200,000
AID TO SUBDIVISIONS 225,000
STATE ACCOMMODATION TAX 50,000
TRANSFER FROM VICTIM WITNESS 32,000
COMMUNICATIONS, INFORMATION & DIGITAL SERVICE 8,000
SRO REVENUE 250,000
JC-LIBRARY EXP CONTRIBUTION 27,000
JC-LIBRARY CAPITAL CONTRIBUTION 5,000
1,797,000
Franchise Fees
FRANCHISE FEES 1,200,000
1,200,000
Police and Court Fines and Fees
POLICE MISC CREDITS 6,000
POLICE SERVICE REIMBURSEMENT 15,000
FINES, FORFEITURES, & FEES 370,000
391,000
Fire
RESCUE SERVICE REIMBURSEMENT 115,200
FIRE SERVICE REIMBURSEMENT 1,000
FIRE INSPECTIONS 35,000
151,200
Recreation Fees
RECREATION REGISTRATION 6,000
CLASSES/ PROGRAMS 2,200
RENTALS 67,000
CONTRACTS/MOU 26,000
SPECIAL EVENTS 3,000
SPONSORSHIPS/ DONATIONS 1,165
CONCESSION REVENUE 2,600
MEMBERSHIPS 106,000
GUEST PASS FEE 20,000
FESTIVAL ON MAIN VENDORS 6,195
FESTIVAL ON MAIN RIDES 40,095
FESTIVAL ON MAIN SPONSORSHIPS/ DONATIONS 100,000
FESTIVAL ON MAIN ATAX 42,348
422,603
Planning, Building and License
BUSINESS LICENSES 3,075,000
PLANNING PERMITS 600,000
BUILDING PERMITS 4,648,432
WATER/SEWER FEES 350,000
8,673,432
Miscellaneous
DEVELOPMENT- ADMIN FEE 100,000
REFUNDS/REIMBURSEMENTS 900,000
LEASE INCOME 25,000
INTEREST 500,000
DONATIONS 10,000
MISCELLANEOUS INCOME 193,555
WORKFORCE TRAINING 307,000
BUDGET STABILIZATION 5,325,890
7,361,445
Total General Fund Revenues 35,019,083
Special Fund Revenues
State Accommodations Tax 1,838,920
Local Hospitality Tax 2,254,297
Local Accommodations Tax 1,862,680
Total Special Fund Revenues 5,955,897
Investment and Development Agreement Fees
Investment and Development Agreement Fees 9,214,135
Total Investment and Development Agreement Fees 9,214,135
Community Foundation
Community Foundation 694,000
Total Community Foundation 694,000
Capital Improvement Plan Revenue
TRANSFER IN GENERAL FUND 904,456
TRANSFER IN A/H TAX FUND 1,296,000
PROCEEDS OF DEBT 6,874,000
GRANTS 2,372,147
OTHER FUNDING SOURCES 4,812,357
TRANSFER IN DEVELOPMENT FEES- Police 367,576
TRANSFER IN DEVELOPMENT FEES- Fire 428,310
TRANSFER IN DEVELOPMENT FEES- Public Works 6,301,400
TRANSFER IN DEVELOPMENT FEES- Recreation 718,896
AMERICAN RESCUE PLAN 1,215,000
Total Capital Improvement Plan Revenue 25,290,142
Total Revenue All Funds 76,173,257
General Fund Expenditures
General Government 10,157,011
Police 5,983,450
Fire 7,546,436
Public Works 1,416,845
Recreation 1,321,875
Council 150,623
Court 358,922
Planning 742,541
Building Safety 1,496,855
Finance 573,042
Workforce Development 324,050
Communications, Information & Digital Solutions 1,388,939
Facilities Maintenance 1,214,642
Safety/ Risk Management 46,500
Debt Service 2,156,504
Festival on Main 140,848
Total General Fund Expenditures 35,019,083
Special Fund Expenditures
State Accommodations Tax 1,838,920
Local Hospitality Tax 2,254,297
Local Accommodations Tax 1,862,680
Total Special Fund Expenditures 5,955,897
Investment and Development Agreement Expenditures
Investment and Development Agreement Expenditures 9,214,135
Total Investment and Development Agreement Fees 9,214,135
Community Foundation
Community Foundation 694,000
Total Community Foundation Expenditures 694,000
Capital Improvement Plan
GENERAL GOVERNMENT
Capital Outlay 12,280,000
General Government CIP Total 12,280,000
POLICE
Capital Outlay 1,200,176
Police CIP Total 1,200,176
FIRE
Capital Outlay 4,921,250
Repairs/Improvements 120,000
Fire CIP Total 5,041,250
PUBLIC WORKS
Capital Outlay 508,000
Repairs/Improvements 269,460
Public Works CIP Total 777,460
RECREATION
Capital Outlay 2,710,000
Recreation CIP Total 2,710,000
PLANNING
Capital Outlay 225,000
Planning CIP Total 225,000
BUILDING SAFETY
Capital Outlay 54,100
Building CIP Total 54,100
COMMUNICATIONS, INFO. & DIGITAL SOLUTIONS
Capital Outlay 114,127
CIDS Total 114,127
GRANTS
Exit 8 MP Improvements 2,108,690
Contingency 289,525
Other Grants 489,814
Grants Total 2,888,029
Capital Improvement Total 25,290,142
Toal Expenditures 76,173,257
293
GLOSSERY OF TERMS
The Annual Budget contains specialized and technical terminology that is unique to public finance
and budgeting. To assist the reader in understanding these terms, a budget glossary of terms has
been included.
Accrued PTO - City employees accumulate paid time off (PTO). The City records a liability for
this accumulation and commits a portion of fund balance to provide for potential payouts.
American Rescue Plan Act (ARPA) (ARP) – Signed into law on March 11, 2021, The American
Rescue Plan Act of 2021 provides $350 billion in additional funding for state and local
governments.
Assessed Value - The estimated value placed on real and personal property by the County’s
Assessor used the basis for levying property taxes.
Balanced Budget - A budget in which revenues fully cover expenditures. Appropriations may be
made from prior year fund balance provided favorable reserves are maintained.
Bond - A form of borrowing which reflects a written promise to pay a specified sum of money,
called the face value or principal amount, at a specific date or dates in the future, called the
maturity date(s), together with periodic interest at a specific rate.
Budget - A comprehensive financial plan of operation which incorporates an estimate of
proposed expenditures for a given period and the proposed means of financing them.
Budget Stabilization Funds - Funds available for expenditure should an unbudgeted event (such
as a hurricane) occur. Often referred to as rainy day funds.
Capital Expenditures - The City considers items which cost more than $5,000 and have a useful
life of greater than one year to be capital assets.
Capital Improvement Plan (CIP) - A plan of capital improvement expenditures to be incurred
each year over a period of the project’s life, setting forth each capital project, the amount to be
expended and the proposed method of funding the project.
294
Debt Limit - The maximum amount of general obligated debt which is legally permitted. The
State of South Carolina forbids cities from incurring debt of more than 8% of the total assessed
valuation of taxable property within the City.
Debt Service - The payment of principal and interest on borrowed funds, such as bonds.
Department - An organizational unit of the City which manages an operation or group of related
operations within a functional area.
Development Agreement - a voluntary contract between a local jurisdiction and the entity that
owns or controls property within the jurisdiction, detailing the obligations of both parties and
specifying the standards and conditions that will govern development of the property.
Fiscal Year (FY) - A 12-month period to which the annual operating budget applies and at the
end of which a government determines its financial position and the results of its operations. The
City of Hardeeville’s fiscal year begins July first and ends the following June thirtieth.
Full-Time Equivalent (FTE) - A position which works a 40-hour week on an ongoing basis and
is specifically authorized for ongoing funding by classification in the annual budget. Two part-
time positions equal one FTE. Most Public Safety (Fire and Police) employees work in shifts.
The normal Fire employee shift is 104 work hours during a two-week period, while a normal
Police employee shift is 84 work hours during a two-week period.
Fund - A fiscal and accounting entity that has self-balancing set of accounts recording cash and
other financial resources, together with all related liabilities and residual equities or balances,
and changes therein, which are segregated for the purpose of carrying on specific activities or
attaining certain objectives in accordance with special regulations, restrictions, or limitations.
Fund Balance - The difference between governmental fund assets and liabilities. Fund Balance is
intended to serve as a measure of the current financial resources available in a governmental
fund.
General Fund - The fund used to account for all financial resources except those required to be
accounted for in another fund. This is considered the City’s chief operating fund.
295
General Obligation (G.O.) Bonds - When the City pledges its full faith and credit to the
repayment of the bonds it issues, then those bonds are General Obligation (G.O.) bonds. These
bonds are usually repaid from taxes relating to debt.
Generally Accepted Accounting Principles (GAAP) - a collection of commonly followed
accounting rules and standards for financial reporting.
Governmental Accounting Standards Board (GASB) - A private non-governmental organization
that creates accounting reporting standards, or Generally Accepted Accounting
Principles (GAAP), for state and local governments in the United States.
Governmental Funds - Funds used to account for tax-supported activities that rely mostly on
current assets and current liabilities. There are five difference types of governmental funds:
General, Special Revenue, Debt Service, Capital Projects, and Permanent Funds.
Intergovernmental Revenue - Revenue received from other governments, whether local, state, or
federal, usually in the form of grants, shared revenues, or payments in lieu of taxes.
Mill - A tax rate based on the valuation of property. A tax rate of one mill produces one dollar of
taxes on each $1,000 of property valuation.
Modified Accrual Accounting - A basis of accounting in which expenditures are accrued, but
revenues are accounted for on a cash basis. This accounting technique is a combination of cash
and accrual accounting since expenditures are immediately incurred as a liability, while revenues
are not recorded until they are received or are “measurable and available.” It is recommended as
the standard for most governmental funds.
Operating Budget - A financial plan for the City’s general operations, such as salaries, contract
services, utilities, and supplies.
Performance Indicators - Statistical information which denotes the demands for services within a
department.
Property Tax - Property taxes are levied on both real and personal property according to the
property’s assessed valuation and the tax rate applied.
296
Special Revenue Fund - A fund used to account for and report the proceeds of specific revenue
sources that are restricted or committed to expenditure for specific purposes other than debt
service or capital projects.
Transect Zone- a land-use term that describes a location's relative density and natural or built
form characteristics. Transect zones are used to inform zoning codes.
297
GLOSSERY OF ACRONYMS
ACFR: Annual Comprehensive Financial Report (Formerly Comprehensive Annual Financial
Report)
AICPA: American Institute of Certified Public Accountants
ARPA / ARP: American Rescue Plan Act
ATAX: Accommodations Tax
CIDS: Communication, Information, Technology and Data Services
CIP: Capital Improvements Plan
COLA: Cost of Living Adjustment
CPI: Consumer Price Index
DA: Developer Agreement
FCI: Facility Condition Index
FTE: Full-Time Equivalent
FY: Fiscal Year
GAAFR: Governmental Accounting, Auditing and Financial Reports
GAAP: General Accepted Accounting Principles
GASB: Governmental Accounting Standards Board
GFOA: Government
Finance Officers Association
298
HTAX: Hospitality Tax
IT: Information Technology
ITB: Invitation to Bid
LCOG: Lowcountry Council of Government
MEOC: Municipal Emergency Operation Center
MID: Municipal Improvement District
MS4: Municipal Separate Storm Sewer System
MZDO: Municipal Zoning and Development Ordinance
PO: Purchase Order
PPE: Personal Protective Equipment
PRT: Parks, Recreation & Tourism Department
RFI: Request for Information
RFP: Request for Proposal
RFQ: Request for Quote
TBD: To Be Determined
299