RecordWell Data

SUPPORTING DOCUMENTS PT 1

City of Goose Creek · Berkeley County · meeting of Oct 17, 2022 · Other

Open the original document More from City of Goose Creek

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

ARCHITECTURAL REVIEW BOARD October 17, 2022 Regular Meeting 6:00PM City Hall Council Chambers 519 N. Goose Creek Blvd Goose Creek, SC 29445 ________________ _____________________________________________________________________ _______________________ __________________________________________ 519 N. Goose Creek Blvd. P.O. Drawer 1768 Goose Creek, S.C. 29445 843-797-6220 www.cityofgoosecreek.com TO: MEMBER S OF THE ARCHITECTURAL REVIEW BOARD FROM: LILI O RTIZ-LUDLUM, ADMINISTRATIVE ASSISTANT DATE: OCTOBER 13, 2022 SUBJECT : NOTIFICATION OF ARCHITECTURAL REVIEW BOARD This is to remind everyone that the next meeting of the ARB is scheduled for Monday, Octobe r 17, 2022, at 6:00 p.m. This meeting will take place at City Hall in Council Chambers. Should you have any questions or comments prior to Monday's meeting, please do not hesitate to contact the Planning Department at 843-797-6220 or via e-mail at planning- zoning@cityofgoosecreek.com. MINUTES 1 MINUTES CITY OF GOOSE CREEK ARCHITECTURAL REVIEW BOARD MEETING MONDAY, SEPTEMBER 19, 2022, 6:00 P.M. MARGUERITE H. BROWN MUNICIPAL CENTER 519 N. GOOSE CREEK BOULEVARD I. CALL TO O RDER AND ROLL CALL Chairperson Wise called the meeting to order at 6:00 p.m., and Ms. Kiser initiated roll call. Present: R obert Smith; Mary Kay Soto; Terri Victor; Jen Wise Absent: Doug Dickerson; Jordan Pace; Armando Solarana Staff Present: Planning and Zoning Director Kendra Wise; Assistant to the City Administrator Alexis Kiser II. APPROVAL OF MINUTES – AUGUST 15, 2022 Motion: A motion was made to approve the minutes as submitted. Moved by Board Member Smith, Seconded by Board Member Victor. Discussion : None. Vote: All voted in favor (4-0). Motion carried. III. NEW BU SINESS A. 2022-062 N BLD: CITY OF GOOSE CREEK AMPHITHEATER: 519 N. GOOS CREEK BLVD- NEW BUILD The appl icant presented the application. The applicant stated the project consists of three distinct areas: the amphitheater, a food truck plaza and an outdoor basketball court with gravel parking. They presented renderings to the board. The applicant answered questions from the board pertaining to parking and storage. It was stated the estimated completion date for this project is April 2024. Motion: A motion was made to approve the application as submitted . Moved by Board Member Smith , Seconded by Board Member Soto. Discussion : None. Vote: Al l voted in favor (4-0). Motion carried. 2 IV. CLOSING REMARKS & ADJOURNMENT Board Member Smith stated Kramerica add ed the Kramer image to the road sign which was denied by the board at the last ARB meeting. Mrs. Soto stated the Brazilian Bakery located on Red Bank add ed the signs that were presented in the ARB packet. Ms. Kiser stated she is working with them. Ms. Kiser stated the sign ordinance did pass second reading which means that signs will no longer be reviewed by the ARB. She stated townhomes and multifamily dwellings are now under ARB purview. She stated a townhome and multifamily training will take place for the ARB. Mrs. Wise stated mandatory training, not related to what Mrs. K iser stated, is also being offered. Motion: Discussion: Vote: A motion was made to adjourn (6:29 p.m. ) Moved by Board Member Soto, Seconded by Board Member Smith. There was none. A ll voted in favor (4-0). Motion carried. __________________________________________________________________ Da te_____________________________ Jen Wise, Chairperson 2022-064PT BOJANGLES ________________ _____________________________________________________________________ _________________________________________________________________ 519 N. Goose Creek Blvd. P.O. Drawer 1768 Goose Creek, S.C. 29445 843-797-6220 www.cityofgoosecreek.com MEMORANDUM TO: City of Goose Creek Architectural Review Board FROM: Alexis Kiser, Assistant to City Administrator RE: Exterior Modification (Former Bojangles) 431 St. James Avenue A DATE: October 4, 2022 Staff has re viewed the submittal to the Architectural Review Board (ARB) and offers the following commentary: Genera l Conformance Analysis On September 28, 2022 city staff issued a stop work order at this location for unauthorized modifications according to Code Sections §151.190(E)(1)C,D. This section gives the Architectural Review Board purview over all color changes and all changes in signs. The work done on this property included changing the paint color of awnings and removing signage from the menu board to “debrand” the property. _____________________________________________________________________________________ _________________________________________________________________ 519 N. Goose Creek Blvd. P.O. Drawer 1768 Goose Creek, S.C. 29445 843-797-6220 www.cityofgoosecreek.com Architectural Review Design Guidelines Analysis As the result of the unapproved work, when painting the awnings, the building received paint overspray. This damages the view of the building from the right -of-way. Furthermore, it is the intent of the ARB to assure respect for the character, integrity and quality of the built environment. Staff Recommendation Staff asks that the ARB approve the application , with the condition of correcting the oversprayed areas on the building as a result of painting the awnings. 2022-066NBLD STEINBERG LAW FIRM _____________________________________________________________________________________ _________________________________________________________________ 519 N. Goose Creek Blvd. P.O. Drawer 1768 Goose Creek, S.C. 29445 843-797-6220 www.cityofgoosecreek.com MEMORANDUM TO: City of Goose Creek Architectural Review Board FROM: Alexis Kiser, Assistant to City Administrator RE: Steinberg Law Firm Architectural Review, S. Goose Creek Boulevard (TMS# 243-16-01-025, 243-16-01-027) DATE: September 22, 2022 Staff has reviewed the submittal to the Architectural Review Board (ARB) and offers the following commentary: General Conformance Analysis This proposal is for an adjustment of a previously approved application (November 2021). The applicant has recently acquired 0.12 acres of a SCDOT right-of-way that was situated in between the property location and S. Goose Creek Boulevard (Highway 52). The applicant will be abandoning the property line and in doing so would like to move the building closer to the right-of-way by eight (8) feet. This parcel is zoned General Commercial (GC), which has a front building setback of twenty (20) feet. The new building location does not encroach into the front building setback. The orientation of the building is not changing from the previously approved version. Architectural Review Design Guidelines Analysis The architectural elements and building design previously presented t he Architectural Review Board are not changing. The only item different from the previous application is the location of the building. The ARB approved design still stands. Staff Recommendation Staff asks the Archiectural Review Board approve the application as submitted as it meets the standards by zone for the General Commerical (GC) zoning district. S. GOOSE CREEK BLVD.                                                                                    x x x x                        GENERAL NOTES C-001                                                x x x x x x x x x x     Co CW SF A LIMITS OF DISTURBANCE = 1.60 ACRES F                       INITIAL LAND DISTURBANCE PHASE NOTES                                             S. GOOSE CREEK BLVD. N76°15'41"W 263.43' Co CW N05°08'50"E 101.71' N05°13'18"E 101.22' N05°11'04"E 101.30' N76°49'12"W 237.89' Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps S15°09'09"W 189.14'    LIMITS OF DISTURBANCE= 1.60 ACRES Co CW SF A F TEMPORARY MAINTENANCE PLAN AND SCHEDULE: DRY SEDIMENT BASIN 1. THE KEY TO A FUNCTIONAL SEDIMENT BASIN IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 2. ATTENTION TO SEDIMENT ACCUMULATIONS WITHIN THE BASIN IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT DEPOSITION SHOULD BE CONTINUALLY CHECKED AND REMOVED WHEN NECESSARY. 3. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 50% OF THE DESIGN SEDIMENT STORAGE VOLUME OR 1 2 THE HEIGHT OF THE RISER STRUCTURE, WHICHEVER IS REACHED FIRST. 4. REMOVED SEDIMENT FROM THE BASIN SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS THE DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 5. INSPECTIONS OF SEDIMENT BASINS SHOULD BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS OF EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. 6. ALL TEMPORARY SEDIMENT BASINS, WHICH ARE NOT TO BE CONVERTED TO A DETENTION BASIN POST CONSTRUCTION, SHOULD BE REMOVED WITHIN 30 DAYS AFTER FINAL SITE STABILIZATION IS ACHIEVED. 7. DISTURBED AREA RESULTING FROM THE REMOVAL OF THE SEDIMENT BASIN SHOULD BE PERMANENTLY STABILIZED AND ADDITIONAL BMPS, SUCH AS SILT FENCE, SHOULD BE UTILIZED TO ACCEPT STORM WATER RUNOFF FROM THIS DISTURBED AREA UNTIL FINAL STABILIZATION IS REACHED. SILT FENCE 1. THE KEY TO FUNCTIONAL SILT FENCE IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 2. REGULAR INSPECTIONS OF SILT FENCE SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVENt THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. 3. ATTENTION TO SEDIMENT ACCUMULATIONS ALONG THE SILT FENCE IS EXTREMELY IMPORTANT. ACCUMULATED SEDIMENT SHOULD BE CONTINUALLY MONITORED AND REMOVED WHEN NECESSARY. 4. REMOVE ACCUMULATED SEDIMENT WHEN IT REACHES 1/3 THE HEIGHT OF THE SILT FENCE. 5. REMOVED SEDIMENT SHALL BE PLACED IN STOCKPILE STORAGE AREAS OR SPREAD THINLY ACROSS DISTURBED AREA. STABILIZE THE REMOVED SEDIMENT AFTER IT IS RELOCATED. 6. CHECK FOR AREAS WHERE STORMWATER RUNOFF HAS ERODED A CHANNEL BENEATH THE SILT FENCE, OR WHERE THE FENCE HAS SAGGED OR COLLAPSED DUE TO RUNOFF OVERTOPPING THE SILT FENCE. INSTALL CHECKS/TIE-BACKS AND/OR REINSTALL SILT FENCE, AS NECESSARY. 7. CHECK FOR TEARS WITHIN THE SILT FENCE, AREAS WHERE SILT FENCE HAS BEGUN TO DECOMPOSE, AND FOR ANY OTHER CIRCUMSTANCE THAT MAY RENDER THE SILT FENCE INEFFECTIVE. REMOVE DAMAGED SILT FENCE AND REINSTALL NEW SILT FENCE IMMEDIATELY. 8. SILT FENCE SHOULD BE REMOVED WITHIN 30 DAYS AFTER FINAL STABILIZATION IS ACHIEVED AND ONCE IT IS REMOVED, THE RESULTING DISTURBED AREA SHALL BE PERMANENTLY STABILIZED. CONSTRUCTION ENTRANCE 1. THE KEY TO FUNCTIONAL CONSTRUCTION ENTRANCES IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL. 2. REGULAR INSPECTIONS OF CONSTRUCTION ENTRANCES SHALL BE CONDUCTED ONCE EVERY CALENDAR WEEK AND, AS RECOMMENDED, WITHIN 24-HOURS AFTER EACH RAINFALL EVENT THAT PRODUCES 1/2-INCH OR MORE OF PRECIPITATION. 3. DURING REGULAR INSPECTIONS, CHECK FOR MUD AND SEDIMENT BUILDUP AND PAD INTEGRITY. INSPECTION FREQUENCIES MAY NEED TO BE MORE FREQUENT DURING LONG PERIODS OF WET WEATHER. 4. RESHAPE THE STONE PAD AS NECESSARY FOR DRAINAGE AND RUNOFF CONTROL. 5. WASH OR REPLACE STONES AS NEEDED AND AS DIRECTED BY SITE INSPECTOR. THE STONE IN THE ENTRANCE SHOULD BE WASHED OR REPLACED WHENEVER THE ENTRANCE FAILS TO REDUCE THE AMOUNT OF MUD BEING CARRIED OFF-SITE BY VEHICLES. FREQUENT WASHING WILL EXTEND THE USEFUL LIFE OF STONE PAD. 6. IMMEDIATELY REMOVE MUD AND SEDIMENT TRACKED OR WASHED ONTO ADJACENT IMPERVIOUS SURFACES BY BRUSHING OR SWEEPING. FLUSHING SHOULD ONLY BE USED WHEN THE WATER CAN BE DISCHARGED TO A SEDIMENT TRAP OR BASIN. 7. DURING MAINTENANCE ACTIVITIES, ANY BROKEN PAVEMENT SHOULD BE REPAIRED IMMEDIATELY. 8. CONSTRUCTION ENTRANCES SHOULD BE REMOVED AFTER THE SITE HAS REACHED FINAL STABILIZATION. PERMANENT VEGETATION SHOULD REPLACE AREAS FROM WHICH CONSTRUCTION ENTRANCES HAVE BEEN REMOVED, UNLESS AREA WILL BE CONVERTED TO AN IMPERVIOUS SURFACE TO SERVE POST-CONSTRUCTION. INLET FILTERS INSTALLATION INSTRUCTIONS: 1. REMOVE GRATE FROM THE DRAINAGE STRUCTURE. 2. CLEAN STONE AND DIRT FROM LEDGE (LIP) OF DRAINAGE STRUCTURE. 3. DROP THE FLEXSTORM INLET FILTER THROUGH THE CLEAR OPENING SUCH THAT THE HANGERS REST FIRMLY ON THE LIP OF THE STRUCTURE. 4. REPLACE THE GRATE AND CONFIRM IT IS NOT ELEVATED MORE THAN 1/8", THE THICKMESS OF THE STEEL HANGERS. FREQUENCY OF INSPECTIONS: 1. INSPECTION SHOULD OCCUR FOLLOWING ANY RAIN EVENT >1/2". 2. POST CONSTRUCTION INSPECTIONS SHOULD OCCUR 4 TIMES PER YEAR. IN SNOWFALL AFFECTED REGIONS ADDITIONAL INSPECTIONS SHOULD TAKE PLACE BEFORE AND AFTER SNOWFALL SEASON. 3. INDUSTRIAL APPLICATION SITE INSPECTIONS (LOADING RAMPS, WASH RACKS, MAINTENANCE FACILITIES) SHOULD OCCUR ON A REGULARLY SCHEDULED BASIS NO LESS THAN 3 TIMES/YEAR. MAINTENANCE GUIDELINE: 1. EMPTY THE SEDIMENT BAG IF MORE THAN HALF FILLED WITH SEDIMENT AND DEBRIS, OR AS DIRECTED. 2. REMOVE THE GRATE, ENGAGE THE LIFTING BARS WITH THE FLEXSTORM REMOVAL TOOL, AND LIFT FROM DRAINAGE STRUCTURE. 3. DISPOSE OF SEDIMENT OR DEBRIS AS DIRECTED BY THE ENGINEER OR MAINTENANCE CONTRACT. 4. AN INDUSTRIAL VACUUM CAN BE USED TO COLLECT SEDIMENT. 5. REMOVE CAKED ON SILT FROM SEDIMENT BAG AND FLUSH WITH MEDIUM SPRAY WITH OPTIMAL FILTRATION. 6. REPLACE BAG IS TORN OR PUNCTURED TO>1/2" DIAMETER ON LOWER HALF OF BAG. GRADING NOTES 1. CONTRACTOR TO VERIFY ALL ADA ACCESS POINTS TO BUILDING WITH ARCHITECT PRIOR TO FINE GRADING & INSTALLATION OF CONCRETE FORMS TO ENSURE ALL ACCESSIBLE ROUTES MEET CODE REQUIREMENTS FOR BOTH HORIZONTAL & VERTICAL. ALL CROSS SLOPES IN THE ADA ROUTE MAY NOT EXCEED 2% SLOPE. IF ANY ROUTE EXCEEDS 2% SLOPE PLEASE CONTACT CIVIL ENGINEER TO DISCUSS PRIOR TO INSTALLATION OF LANDSCAPE. 2. CONTRACTOR TO VERIFY REQUIRED DROP AROUND BUILDING EXTERIOR FACADE AT FOUNDATION WHICH MAY VARY BETWEEN 4"-8" WHERE PEDESTRIAN WALK DOES NOT ABUT BUILDING ENTRY. IN ADDITION TO REQUIRED DROP AT THE FOUNDATION CONTRACTOR TO SLOPE FINISH GRADE AWAY FROM BUILDING 6" IN THE FIRST 6'. ( PER BUILDING CODE IBC 2018) CONTRACTOR TO COORDINATE WITH CIVIL ENGINEER IF PLANS DONT CLEARLY DEFINE OR PROVIDE THIS SLOPE Ts Ps S. GOOSE CREEK BLVD. N76°15'41"W 263.43' N14°51'55"E 100.00' N05°08'50"E 101.71' N05°13'18"E 101.22' N05°11'04"E 101.30' N76°49'12"W 237.89' Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps Ts Ps S15°09'09"W 189.14'     PERMANENT MAINTENANCE PLAN AND SCHEDULE: POND MAINTENANCE 1. REGULAR INSPECTIONS: INSPECTIONS SHALL BE PERFORMED AT LEAST TWICE A YEAR AND MORE REGULARLY AS LISTED BELOW OR AS SPECIFIED BY A MANUFACTURER. INSPECTION REPORTS SHALL BE GENERATED AND KEPT ON FILE FOR AT LEAST 5 YEARS. REPORTS ARE TO BE MADE AVAILABLE TO THE CITY OF CHARLESTON UPON REQUEST. IF GENERATED BY A THIRD PART, IT SHALL REMAIN THE OWNER'S (OR OWNERS' RESPONSIBILITY TO MAINTAIN THE REPORTS. 2. ROUTINE MAINTENANCE: SOME MAINTENANCE ACTIVITIES ARE NEEDED ON A ROUTINE BASIS, AS LISTED BELOW. THE ACTIVITIES LISTED SHOULD BE PERFORMED ON A MONTHLY BASIS OR MORE FREQUENTLY IF NEEDED OR UNLESS SPECIFIED BELOW OR BY A MANUFACTURER. a. VEGETATION MANAGEMENT: IF APPLICABLE, GRASS SHOULD BE MOWED BIMONTHLY OR MORE FREQUENTLY IF NEEDED. b. INLET AND OUTLET STRUCTURES: ANY BLOCKAGE OF INLETS AND OUTLETS STRUCTURES SHOULD BE REMOVED. INLET AND OUTLET PROTECTION SHOULD BE REPAIRED OR REPLACED AS NEEDED. c. DEBRIS AND LITTER: TRASH AND OTHER DEBRIS THAT COLLECTS IN THE BMP SHOULD BE REMOVED. 3. SEDIMENT REMOVAL: BMPS WILL TRAP SEDIMENTS AND OTHER SETTLEABLE MATERIAL OVER TIME AND THIS MATERIAL SHOULD BE REMOVED ONCE THE STORAGE CAPACITY HAS BEEN REDUCED B 33%. REMOVAL OF THE SEDIMENT SHALL OCCUR NO LESS FREQUENTLY THAN ONCE EVERY YEAR OR A S SPECIFIED BY THE MANUFACTURER. IF A FOREBAY EXISTS, ANY TRASH, SEDIMENT, OR OTHER DEBRIS SHOULD BE COMPLETELY REMOVED AS DISCOVERED THROUGH ROUTINE MAINTENANCE ACTIVITIES OR INSPECTIONS. 4. SLOPE STABILIZATION/STRUCTURAL INTEGRITY: SLOPE EROSION, SINK HOLES, OR OTHER STRUCTURAL ISSUES SHOULD BE REPAIRED AS SOON AS DISCOVERED THROUGH ROUTINE MAINTENANCE ACTIVITIES OR INSPECTIONS. 5. A PERMANENT STAND OF GRASS MUST BE MAINTAINED ON ALL PONDS. (TOPS, SLOPES, AND BOTTOMS) 6. BASED ON THE SUBMITTED PLAN AND BERKELY COUNTY REQUIREMENTS, THE ROADWAYS AND DRAINAGE SYSTEM FOR THE PROPOSED PROJECT WILL BE PRIVATE AND MAINTAINED BY THE PROPERTY OWNER. BERKELEY COUNTY WILL NOT BE RESPONSIBLE FOR THE MAINTENANCE OF THE ROADWAYS AND DRAINAGE SYSTEM. (SEE RECORDED COVENANTS FOR PERMANENT MAINTENANCE OF STORM WATER FACILITIES) Ps     GENERAL POWER AND LIGHTING NOTES CONSTRUCTION DETAILS (SITE) C-500  (NOT TO SCALE) SECTION VIEWISOMETRIC VIEW (NOT TO SCALE) (NOT TO SCALE) 1" CHAMFER BOTH CORNERS x 3000 PSI CONCRETE (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) x x x x x x x x x (NOT TO SCALE) x x x x x x x x x (NOT TO SCALE) x x x x x x x x x x x (NOT TO SCALE)(NOT TO SCALE) (NOT TO SCALE) x (NOT TO SCALE) DUMPSTER SCREEN PLAN BOLLARD DETAIL DUMPSTER SCREEN SECTION (NOT TO SCALE) (NOT TO SCALE)(NOT TO SCALE)(NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE)   (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) RECOMMENDED MINIMUM TRENCH WIDTHS © MINIMUM RECOMMENDED COVER BASED ON VEHICLE LOADING CONDITIONS** * VEHICLES IN EXCESS OF 75T MAY REQUIRE ADDITIONAL COVER **SEE BACKFILL REQUIREMENTS IN NOTE 6. NOTES: 1. ALL PIPE SYSTEMS SHALL BE INSTALLED IN ACCORDANCE WITH ASTM D2321, "STANDARD PRACTICE FOR UNDERGROUND INSTALLATION OF THERMOPLASTIC PIPE FOR SEWERS AND OTHER GRAVITY FLOW APPLICATIONS", LATEST ADDITION 2. MEASURES SHOULD BE TAKEN TO PREVENT MIGRATION OF NATIVE FINES INTO BACKFILL MATERIAL, WHEN REQUIRED. 3. FOUNDATION: WHERE THE TRENCH BOTTOM IS UNSTABLE, THE CONTRACTOR SHALL EXCAVATE TO A DEPTH REQUIRED BY THE ENGINEER AND REPLACE WITH SUITABLE MATERIAL AS SPECIFIED BY THE ENGINEER. AS AN ALTERNATIVE AND AT THE DISCRETION OF THE DESIGN ENGINEER, THE TRENCH BOTTOM MAY BE STABILIZED USING A GEOTEXTILE MATERIAL. 4. BEDDING: SUITABLE MATERIAL SHALL BE CLASS I, II OR III. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. UNLESS OTHERWISE NOTED BY THE ENGINEER, MINIMUM BEDDING THICKNESS SHALL BE 4" (100mm) FOR 4"-24" (100mm-600mm); 6" (150mm) FOR 30"-60" (750mm-1500mm). 5. INITIAL BACKFILL: SUITABLE MATERIAL SHALL BE CLASS I, II OR III IN THE PIPE ZONE EXTENDING NOT LESS THAN 6" ABOVE CROWN OF PIPE. THE CONTRACTOR SHALL PROVIDE DOCUMENTATION FOR MATERIAL SPECIFICATION TO ENGINEER. MATERIAL SHALL BE INSTALLED AS REQUIRED IN ASTM D2321, LATEST EDITION. 6. MINIMUM COVER: MINIMUM COVER, H, IN NON-TRAFFIC APPLICATIONS (GRASS OR LANDSCAPE AREAS) IS 12" FROM THE TOP OF PIPE TO GROUND SURFACE. ADDITIONAL COVER MAY BE REQUIRED TO PREVENT FLOTATION. FOR TRAFFIC APPLICATIONS, MINIMUM COVER, H, IS 12" UP TO 48" DIAMETER PIPE AND 24" OF COVER FOR 60" DIAMETER PIPE, MEASURED FROM TOP OF PIPE TO BOTTOM OF FLEXIBLE PAVEMENT OR TO TOP OF RIGID PAVEMENT. FOR TRAFFIC APPLICATIONS WITH LESS THAN FOUR FEET OF COVER, EMBEDMENT OF THE PIPE SHALL BE USING ONLY A CLASS I OR CLASS II BACKFILL. MAXIMUM RECOMMENDED COVER BASED ON VECHICLE LOADING CONDITIONS FILL HEIGHT TABLE GENERATED USING AASHTO SECTION 12, LOAD RESISTANCE FACTOR DESIGN (LRFD) PROCEDURE WITH THE FOLLOWING ASSUMPTIONS: NO HYDROSTATIC PRESSURE, UNIT WEIGHT OF SOIL (Ys) = 120 PCF (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) (NOT TO SCALE) Ts TEMPORARY SEEDING SPECIFICATION Ps PERMANENT SEEDING SPECIFICATION  SF      (NOT TO SCALE)  (NOT TO SCALE) TYPICAL RECTANGULAR INLET FILTER COMBINATION INLET FILTER FOR CURB HOODS TYPICAL ROUND INLET FILTER STAINLESS STEEL ROUND INLET FILTERS for NYLOPLAST CASTINGS CATCH-ITS SPECIFIED W/ FX or FX-S BAGS 1 1 2 2 3 3 4 4 A A B B C C D D SHEET 1 OF 1 DWG NOSIZE SCALE REV (NOT TO SCALE) S. GOOSE CREEK BLVD.     ORNAMENTAL GRASS UNDERSTORY TREES QUANTITYCOMMON NAME CANOPY TREES SHRUBS BOTANICAL NAME PLANT SCHEDULE SIZE CALIPER SPACING GROUND COVER x x x x x x x x x x x x x x x x x

Source: City of Goose Creek website. First collected Oct 17, 2026.