RecordWell Data

SUPPORTING DOCUMENTS

City of Goose Creek · Berkeley County · meeting of Aug 16, 2021 · Other

Open the original document More from City of Goose Creek

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MARGUERITE BROWN MUNICIPAL CENTER CITY HALL COUNCIL CHAMBERS 519 N. GOOSE CREEK BLVD. GOOSE CREEK, SOUTH CAROLINA 1 TO: MEMBERS OF THE ARCHITECTURAL REVIEW BOARD FROM: LILI ORTIZ-LUDLUM, ADMINISTRATIVE ASSISTANT DATE: AUGUST 12, 2021 SUBJECT: MEETING NOTIFICATION WHERE: MARGUERITE H. BROWN MUNICIPAL CENTER This is to remind everyone that the next meeting of the Architectural Review Board is scheduled for Monday, August 16, 2021 at 6:00 p.m. Please review the enclosed packet. Should you have any questions or comments prior to Monday’s meeting, please do not hesitate to contact Brenda Moneer, Planning and Zoning Technician (x1116) or Mark Brodeur, Planning and Zoning Director(x.1118) at 843-797-6220. MEMORANDUM 2 MINUTES 3 MINUTES CITY OF GOOSE CREEK ARCHITECTURAL REVIEW BOARD MEETING MONDAY, JULY 26, 2021, 6:00 P.M. MARGUERITE H. BROWN MUNICIPAL CENTER 519 N. GOOSE CREEK BOULEVARD I. CALL TO ORDER, PLEDGE OF ALLEGIANCE AND ROLL CALL Chairperso n Dresel called the meeting to order at 6:0 0 p.m. and initiated the Pledge of Allegiance. Mrs. Moneer initiated roll call. Present: Ric ky Dresel, Jen Wise, David Cantrill, Mary Kay Soto, Teri Victor Absent: Sharon Clopton, Gary Becker Staff Presen t: Planning and Zoning Director Mark Brodeur Planning and Zoning Technician Brenda Moneer II. APPROVAL OF MINUTES – JUNE 21, 2021 Motion: A mo tion was made to accept the minutes as submitted. Moved by Board Member Wise, Seconded by Board Member Cantrill. Discussion: None. Vote: All v oted in favor (5-0). Motion carried. III. MINOR APPLICATIONS – NEW BUSINESS A. 2021- 045 SIG: S C FEDERAL CREDIT UNION: 82 BRIDGETOWN ROAD – SIGNAGE A representative p resented the application. She stated South Carolina Federal Credit Union is currently upfitting their facility and all new signs will be installed. She stated the building signs will be halo lit. The monument sign will have push through letters. The background will be opaque, and the letters will be illuminated. The directional will not be luminated. Discussion occurred as where the signs will be located. The applicant stated they will be placed where they are currently existing. Mr. Brodeur stated he would prefer to see the address on both sides of the monument signs. Motion: A mo tion was made to accept the application as submitted. Moved by Board Member Soto, Seconded by Board Member Wise. Discussion: Bo ard Member Cantrill inquired as to the color of the building. The representative stated she is not sure as to the current color of the building. Mrs. Moneer presented the proposed rendering of the scope of work. 4 Amended Motion: An amended motion was made to accept the application as submitted with the addition that the street number be added to both sides of the monument sign. Moved by Board Member Soto, Seconded by Board Member Wise. Vote: All voted in favor (5-0). Motion carried. B. 2021-047 SIG: O UTLAW BARBER COMPANY: 119 PLANTATION NORTH BLVD, UNIT C –SIGNAGE A representative p resented the application. He stated this business will be located in the Goose Creek Village. He stated the sign will be internally lit channel letters. Motion: A mo tion was made to accept the application as submitted. Moved by Board Member Wise, Seconded by Board Member Victor. Discussion: None . Vote: All voted in favor (5-0). Motion carried. C. 2021-048 SIG: G OD’S LITTLE MASTERMINDS/ DELIVERANCE & FAITH MINISTRIES: 107 ST. JAMES AVE, SUITE B1 & B2 – SIGNAGE A representative p resented the application. The representative stated he has a change to this sign and presented to the board a new rendering. He stated it is the same design that is presented in the packet however he inverted the black and white. The sign will be opaque with white letters; t he logo will stay the same. He stated this is an existing cabinet sign that is already on the building. He stated he will remove the current panel and install a new panel in its place. Motion: A mo tion was made to accept the application as presented. Moved by Board Member Soto, Seconded by Board Member Cantrill. Discussion: None . Vote: All voted in favor (5-0). Motion carried. D. 2021-049 ROOF: RI PLEY’S ACCOUNTING: 205 RED BANK ROAD – REROOF A representative p resented the application. He stated Ripley’s Accounting currently has a flat roof which has caused problems. The proposal is to build over the roof per engineer’s specifications and put an architectural vinyl siding on the front and vinyl siding on the back gable ends. The facia would come down to meet the brick line so no siding will be needed on the sides. The representative presented material samples to the board. 5 Motion: A motion was made to accept the application as submitted. Moved by Board Member Cantrill, Seconded by Board Member Wise. Discussion: None . Vote: All voted in favor (5-0). Motion carried. E. 2021-050 PT: DRE AM LEARNING ACADEMY: 100 GOOSE CREEK BLVD – PAINT EXTERIOR AND FENCE, REPLACE EXTERIOR DOORS AND WINDOW FRAMES A representative p resented the application. He stated they are upfitting this building. He presented a rendering and material samples to the board. It was stated that signage will be presented at a later date as it was tabled at the last meeting. The board inquired if the fence would be painted. It was stated that it would be painted gray. Chairman Dresel stated it would be prudent to make a comment to spruce up landscaping and that it matches the rendering. Motion: A mo tion was made to accept the application as submitted with the addition that landscape reflects the rendering and is alive and well. Moved by Board Member Wise , Seconded by Board Member Cantrill. Discussion: Mr . Brodeur stated this site has 96 parking spaces which is a lot for a facility this size. He stated the Planning Commission has been struggling with projects that come in over parked. He stated this is a renovation so he will not suggest the removal of parking spaces, but this is an area where the City can make a facade grant to this property, and he would love to see trees planted someplace in this parking lot . He stated this is a lot of asphalt for this site and recommends a condition is made for the project that the applicant speaks to the Economic Development Department to seek a facade grant. The applicant stated there are plans on the adjacent parcel that the landowner owns for future development that would use some of the parking. Amended M otion: A motion was made to accept the application as submitted, to spruce up current landscaping, and to suggest that the applicant speak with the City’s Economic Development Department for possible grants to further spruce up the property. Moved by Board Member Wise, Seconded by Board Member Cantrill. Vote: All voted in favor (5-0). Motion carried. IV. OLD BUSINESS: MAJOR APPLICATIONS 6 A. 2021-051 RENO: MILLER CONWAY LAWYERS: 124 S. GOOSE CREEK BLVD – SECOND FLOOR ADDITION RENOVATION. The applicant p resented the application. He stated they want to add a second story to the back 1/3 of the building. He stated one point at the last meeting that he wanted to address today was clarification of the location for the Miller Conway Sign, he stated that would be submitted on a separate application but did include it on the elevation. He stated on the side the faces Evatt Stree t, we provided additional screening. He stated the screening would be a permanent structure with a footing in brick to screen the HVAC units. The applicant stated greenery was the initial screening that was approved for the dental office, however, to make everything cohesive, all screening will now be brick. Motion: A mo tion was made to accept the application as submitted. Moved By: Board Member Soto, Seconded By: Board Member Victor. Discussion: T here was none. Vote: All voted in favor (5-0). Motion carried. V. CLOSING REMARKS AND ADJOURNMENT Board Memb er Wise stated the new Brazilian restaurant windows is full of signage. Mr. Brodeur stated they are aware. Board Member Wise inquired if there is a limit to how many times a logo can be added to a building. Mrs. Moneer stated as long as they do not exceed the sign coverage. Mr. Brod eur stated recently staff conducted a city-wide review of all the signs existing in the city . He stated he was surprised to find how many offenders they have of window signs exceeding the allowable coverage. Board Memb er Cantrill inquired as to when the Brewery will open. Mr. Brodeur stated he was not sure. Mr. Brodeur stated one of the changes recommended by the Planning Commission to City Council is a way to improve the overall aesth etics of the signs w e are receiving. The Planning Department has noticed a lot of the signs the ARB is asked to approve are simple plastic replacement signs. He stated these signs tend to be low er quality. He stated the Planning Commission recommended allowing these signs however they should have an opaque field and translucent letters. Mr. Brodeur stated this will allow light to go through so that during the day the business can have whatever background they want on the sign, but at night all you will see is the illuminated letters of the signs. It would be a lot clearer and aesthetically pleasing. He stated City Council has not adopted the sign code yet but there will be a workshop coming up. 7 Board Member Soto stated she was disappointed with the inconsistency of the look at Goose Creek Village. Mr. Brodeur suggested that the next time a development like this is in the city we request they come up with a sign program that is of consistent font, coverage, and placement. Motion: A m otion w as made to adjourn (6: 50p.m.) Moved By: Board Member Cantrill, Seconded By: Board Member Wise. Discussion: Th ere was none. Vote: A ll voted in favor (5-0). Motion carried. __________________________________________________________________ Dat e_____________________________ Ricky Dresel, Chairperson 8 NEW BUSINESS: MINOR APPLICATIONS 2021-053 SIG LOWCOUNTRY BELL CLUB 219 S. GOOSE CREEK BLVD- SIGNAGE 9 16541 219 S Goose Creek Blvd. 044268 75.00 08/02/2021 YEARLY 10 32sf 11 12 13 NEW BUSINESS: MINOR APPLICATIONS 2021-054 SIG EXXON 670 COLLEGE PARK ROAD - SIGNAGE 14 044092 75.00PAID 6-29-2021 15 16 17 3URSRVHG6LJQVTIWµ2$+ ([LVWLQJ6LJQVTIWµ2$+  18 19 NEW BUSINESS: MINOR APPLICATIONS 2021-055 PT CROWFIELD PARK PLAZA 119 SPRINGHALL DRIVE - EXTERIOR PAINT 20 21 22 NEW BUSINESS: MINOR APPLICATIONS 2021-056 PT 103 MARILYN STREET - SIGNAGE 23 All exterior painting of a different color requires ARB Approval. Building "appears" to be residential in nature but zoning is Commercial (GC) Please contact Brenda Moneer, at extension 1116 24 25 NEW BUSINESS: MAJOR APPLICATIONS 2021-057 NBLD TIME TO SHINE 539 ST JAMES AVE - SITE, LANDSCAPE, ELEVATIONS 26 27 28 D:\Jacob Rice\Time to Shine\Goose Creek\Plan Set\Plan Set for ARB_8.2.21.dwgAug 02, 2021 - 4:13pmPrinted By:Alden 803.760.3437 14 CALENDAR CT. COLUMBIA, SC 29206 PROJECT CONTACTS CITY OF GOOSE CREEK, SC ARCHITECTURAL REVIEW BOARD PLANS FOR **** THE INDIVIDUALS LISTED **** HERE-IN ARE INTENDED TO BE POINTS OF CONTACT AND ARE NOT NECESSARILY THE PROFESSIONALS OF RECORD. REFER TO THE INDIVIDUAL DISCIPLINE PLANS FOR INFORMATION REGARDING THE RESPECTIVE PROFESSIONALS OF RECORD. PHONE: EMAIL: CONTACT: SURVEYOR SURVEYING & MAPPING, LLC (SAM) 6904 N. MAIN ST., SUITE 102 COLUMBIA, SC 29203 DON WILSON (803)764-1902 DON.WILSON@SAM.BIZ PHONE: EMAIL: CONTACT: PLANNING & ZONING CITY OF GOOSE CREEK 519 NORTH GOOSE CREEK BLVD. GOOSE CREEK, SC 29445 (843)797-6220 PHONE: EMAIL: CONTACT: ENGINEER JACOB RICE ENGINEERING, LLC 14 CALENDAR CT. COLUMBIA, SC 29206 ALDEN LIVINGSTON (803)760-3437 ALIVINGSTON@JACOBRICEENG.COM TIME TO SHINE AT ST JAMES AVE. TIME TO SHINE CAR WASH, INC. PHONE: EMAIL: CONTACT: DEVELOPER/OWNER TIME TO SHINE CAR WASH, INC. 2814 BYINGTON SOLWAY RD. KNOXVILLE, TN 37931 MIKE ROPER MROPER99@COMCAST.NET DEVELOPED BY PHONE: EMAIL: CONTACT: STORMWATER BERKELEY COUNTY 1003 HWY 52 MONKS CORNER, SC 29461 (843)719-4234 LAND DISTURBANCE ±1.3 ACRES SHEET INDEX SHT. NO. SHEET NAME SITE CIVIL C-001 COVER SHEET C-002 EXISTING CONDITIONS C-101 SITE PLAN C-102 SITE PLAN W/ AERIAL OVERLAY C-103 LANDSCAPE PLAN ARCHITECTURAL A-1 FLOOR PLAN A-2 EXTERIOR ELEVATIONS A-3.1 EXTERIOR ELEVATIONS COLOR (EXIT & ENTRY) A-3.2 EXTERIOR ELEVATIONS COLOR (TUNNEL & OFFICE) A-4.1 SITE PERSPECTIVES A-4.2 SITE PERSPECTIVES A-5.1 BUILDING PERSPECTIVES 8/2/21 GOOSE CREEK ARCH. REVIEW BOARD DIAL 811 PHONE: EMAIL: CONTACT: ARCHITECT FALCONNIER DESIGN 4622 CHAMBLISS AVE. KNOXVILLE, TN 37919 GRAHAM FOX (865)584-7868 GRAHAM.FOX@FALCONNIER.NET IN GENERAL NOTES: 1. A COMPLETE SET OF APPROVED DRAWINGS MUST BE MAINTAINED ON SITE AT ALL TIMES THAT THE CONTRACTOR IS PERFORMING WORK. 2. WITHIN ALL NOTES, THE TERM CONTRACTOR SHALL MEAN THE GENERAL CONTRACTOR AND ANY SUBCONTRACTOR OR VENDOR PERFORMING CONSTRUCTION ON THE SITE. 3. SHOULD THE CONTRACTOR FIND ANY DISCREPANCIES ON THE DRAWINGS, OR IN THE FIELD PRIOR TO BEGINNING WORK OR DURING CONSTRUCTION, HE SHALL IMMEDIATELY NOTIFY THE ENGINEER. 4. BOUNDARY AND TOPOGRAPY HAS NOT BEEN FIELD VERIFIED BY THE ENGINEER. IT WILL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY EXISTING FIELD CONDITIONS AND REPORT ANY DISCREPANCIES OR CONFLICTS TO THE ENGINEER PRIOR TO CONSTRUCTION. 5. THE CONTRACTOR IS RESPONSIBLE FOR LOCATING AND VERIFYING ALL UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION AND IS RESPONSIBLE FOR ANY DAMAGE TO THEM DURING CONSTRUCTION. CONTRACTOR SHALL CONTACT THE STATE'S LOCATION SERVICE AT LEAST 48 HOURS PRIOR TO BEGINNING CONSTRUCTION. 6. THE CONTRACTOR SHALL COMPLY WITH ALL RULES AND REGULATIONS OF FEDERAL, STATE, COUNTY AND LOCAL MUNICIPALITIES. 7. ALL MATERIALS, METHODS, AND DETAILS OF CONSTRUCTION SHALL CONFORM TO THE STANDARD SPECIFICATIONS AND REGULATIONS OF THE BERKELEY COUNTY, THE CITY OF GOOSE CREEK, SOUTH CAROLINA DEPARTMENT OF HEALTH & ENVIRONMENTAL CONTROL (SCDHEC), & SOUTH CAROLINA DEPARTMENT OF TRANSPORTATION (SCDOT). 8. ALL RIGHT-OF-WAY CONSTRUCTION SHALL MEET LOCAL AND STATE DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS, LATEST EDITION. 9. THE CONTRACTOR IS REQUIRED TO MEET ALL APPLICABLE FEDERAL, OSHA, STATE, & LOCAL REGULATIONS CONCERNING PROJECT SAFETY AND ASSUMES FULL RESPONSIBILITY FOR SAFETY ON THE PROJECT. 10. THE CONTRACTOR SHALL VERIFY THAT ALL NECESSARY PERMITS FOR CONSTRUCTION HAVE BEEN OBTAINED PRIOR TO THE START OF THE PROJECT. 11. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGES TO EXISTING INFRASTRUCTURE WITHIN THE SITE OR ADJOINING PROPERTIES (i.e. PAVEMENT, CURB, SIDEWALK, UTILITIES, LANDSCAPED AREAS etc.). THE CONTRACTOR SHALL REPAIR/REPLACE ALL DAMAGED ITEMS IMMEDIATELY, IF NECESSARY, OR PRIOR TO THE END OF THE JOB AND AT NO COST TO THE OWNER IN ACCORDANCE WITH LOCAL REGULATORY REQUIREMENTS. 12. CONTRACTOR SHALL PROVIDE AS-BUILT RECORDS OF ALL CONSTRUCTION (INCLUDING UNDERGROUND UTILITIES) TO THE OWNER FOLLOWING COMPLETION OF CONSTRUCTION ACTIVITIES, AS REQUIRED. 13. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING INSTALLATION OF ALL UTILITIES BY THE APPROPRIATE UTILITY COMPANY AND SUBCONTRACTORS PERFORMING WORK TO AVOID CONFLICTS. THE CONTRACTOR IS ALSO RESPONSIBLE FOR SCHEDULING INSTALLATION OF ALL UTILITIES IN A TIMELY, ORGANIZED, AND SYSTEMATIC MANNER. 14.IN THE EVENT OF A CONFLICT WITH WATER, SEWER, DRAINAGE OR OTHER UTILITY LINES, THE CONTRACTOR SHALL COORDINATE WITH THE ENGINEER PRIOR TO MAKING FIELD ADJUSTMENTS. 15. THE CONTRACTOR IS RESPONSIBLE FOR THE REMOVAL AND DISPOSAL OF ALL RUBBISH, TRASH, DEBRIS, AND ORGANIC MATERIAL etc. IN A LEGAL MANNER. 16. THE CONTRACTOR SHALL REFERENCE THE PROJECT GEOTECHNICAL REPORT AND COMPLY WITH ALL REPORT RECOMMENDATIONS. IF A CONFLICT ARISES BETWEEN CIVIL DOCUMENTS AND GEOTECHNICAL REPORT, THE MORE STRINGENT SHALL GOVERN. SITE VICINITY MAP - 1"=1500' 539 ST JAMES AVE. GOOSE CREEK, SC 29445 OLD MT. HOLLY RD ST. JAMES AVE PROJECT SITE PHONE: EMAIL: CONTACT: CONTRACTOR WILD BUILDING CONSTRUCTION, INC. 225 W. 1st NORTH STREET, SUITE 102 MORRISTOWN, TN 37814 LANCE WILDS (423)581-5639 LANCE@WILDBUILDING.COM 29 D:\Jacob Rice\Time to Shine\Goose Creek\Plan Set\Plan Set for ARB_8.2.21.dwgAug 02, 2021 - 4:15pmPrinted By:Alden 803.760.3437 14 CALENDAR CT. COLUMBIA, SC 29206 NOTE: THIS SCALE APPLIES FOR SHEETS ONLY24"x36" 1 INCH = FT GRAPHIC SCALE 020' 10' 20' 20 SITE VICINITY MAP - 1"=1500' 539 ST JAMES AVE. GOOSE CREEK, SC 29445 OLD MT. HOLLY RD ST. JAMES AVE PROJECT SITE MAP & DEMOLITION NOTES: 1. ALL EXISTING BOUNDARY INFORMATION PROVIDED BY PARKER LAND SURVEYING, LLC (SEALED BY RICHARD A. ALDRIDGE ON MAY 12, 2021) & TOPOGRAPHY INFORMATION PROVIDED BY SURVEYING & MAPPING, LLC (SAM) (SEALED BY DON WILLSON ON JULY 30, 2021). 2. TRANSFER OF SITE BENCHMARK(S) IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR AND SHALL ONLY BE COMPLETED BY A SURVEYOR LICENSED/REGISTERED IN THE STATE IN WHICH THE PROJECT IS LOCATED. 3. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFICATION OF EXISTING BENCHMARK(S) PRIOR TO ANY CONSTRUCTION AND SHALL REPORT ANY DISCREPANCIES IMMEDIATELY TO THE ENGINEER. FIELD VERIFICATION CAN BE ACCOMPLISHED BY CHECKING A MINIMUM OF TWO FIXED OBJECTS DISPLAYED ON THE SURVEY (i.e. MANHOLE RIM, STORM GRATE, PIPE INVERTS, ETC.). 4. THE CONTRACTOR SHALL FIELD VERIFY ALL ITEMS TO BE DEMOLISHED & REMOVED FROM THE SITE. THE VERIFICATION PROCESS SHALL INCLUDE VISITING & WALKING THE SITE WITH THE OWNER AND THE ENGINEER. ALL ITEMS REQUIRING DEMOLITION/REMOVAL, WHETHER SHOWN ON THIS PLAN OR NOT, SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 5. PRIOR TO THE COMMENCEMENT OF CLEARING, THE CONTRACTOR SHALL WALK THE SITE WITH THE OWNER & ENGINEER TO IDENTIFY TREES AND/OR VEGETATION TO REMAIN. PROTECTION OF IDENTIFIED TREES AND/OR VEGETATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. 6. ALL DEMOLISHED ITEMS/MATERIALS OR ANY ITEMS THAT ARE NOT SALVAGED SHALL BE REMOVED FROM THE PROJECT SITE & DISPOSED OF IN ACCORDANCE WITH APPLICABLE CODES. 7. THERE SHALL BE NO BURNING ON-SITE. 8. EROSION & SEDIMENT CONTROL DEVICES MUST BE IN PLACE PRIOR TO DEMOLITION. REFER TO THE CONSTRUCTION SEQUENCE ON GENERAL NOTES SHEET C-002. FIRST, CLEARING, GRUBBING, & DEMOLITION SHALL BE LIMITED TO INSTALL PERIMETER CONTROL BMPs (INCLUDES SILT FENCE, INLET PROTECTION FOR EXISTING STRUCTURES, & CONSTRUCTION ENTRANCE(s)). 9. IF ANY HAZARDOUS MATERIAL IS ENCOUNTERED DURING DEMOLITION, THE CONTRACTOR SHALL COORDINATE WITH THE OWNER & APPROPRIATE AGENCIES FOR PROPER REMOVAL & DISPOSAL. 10. ANY TREES TO BE CLEARED SHALL BE REMOVED OF STUMPS AND ROOT SYSTEM ENTIRELY. 11.IF ENCOUNTERED, WELLS & SEPTIC TANKS SHALL BE ACCURATELY LOCATED BY THE CONTRACTOR & THE SURROUNDING AREA SHALL BE BARRICADED & GRADES SHALL BE MAINTAINED IN THE AREA SUCH THAT SURFACE RUNOFF CANNOT ENTER THE OPENING. THE CONTRACTOR SHALL NOTIFY THE THE ENGINEER & OWNER IMMEDIATELY. 12. APPLICABLE SCDOT PERMITS SHALL BE OBTAINED BEFORE PERFORMING ANY WORK IN SCDOT R/W. 13. PROPOSED WORK ON ADJACENT PROPERTIES SHALL NOT TAKE PLACE PRIOR TO PERMISSION/TEMPORARY CONSTRUCTION EASEMENTS ARE OBTAINED. 14. SIDEWALK, CURB, AND GUTTER TO BE REMOVED AND REPLACED FROM JOINT TO JOINT. 15. CONTRACTOR TO SAW CUT, WHERE APPLICABLE, FOR SMOOTH JOINTS. JOINTS SHALL NOT BE ALIGNED WITH WHEEL PATH. 16. THE CONTRACTOR SHALL DEMOLISH EXISTING BUILDING, CANOPIES, ACCESSORY STURTURES, FOUNDATIONS, ATTACHED UTILITIES, ASPHALT, & CURB & GUTTER, ETC. INSIDE THE DEMOLITION LIMITS ENTIRELY, EXCEPT WHERE SHOWN. REFERENCE SHEET C-401 FOR UTILITIES TO REMAIN FULLY OPERATIONAL. 17. THE CONTRACTOR SHALL COORDINATE WITH THE APPLICABLE UTILITIES FOR THE REMOVAL / RELOCATION OF EXISTING UTILITIES (UNDERGROUND & OVERHEAD). MAP & DEMOLITION NOTES: 30 20' BUILDINGSETBACK LINE FLAG POLE D:\Jacob Rice\Time to Shine\Goose Creek\Plan Set\Plan Set for ARB_8.2.21.dwgAug 02, 2021 - 4:33pmPrinted By:Alden 803.760.3437 14 CALENDAR CT. COLUMBIA, SC 29206 NOTE: THIS SCALE APPLIES FOR SHEETS ONLY24"x36" 1 INCH = FT GRAPHIC SCALE 020' 10' 20' 20 LOT SUMMARY: ADDRESS: 539 ST JAMES AVE., GOOSE CREEK, SC 29445 TMS #: 234-00-00-153 TOTAL PROJECT SITE AREA: ±1.26 ACRES ZONING: GENERAL COMMERCIAL - EXISTING LAND USE: VACANT COMMERCIAL - PROPOSED USE: AUTOMOBILE SERVICE STATION (AUTOMATED CAR WASH) LOT REQUIREMENTS: - SETBACKS: FRONT - 20', REAR - 20', & SIDE - 10' - BUFFER YARDS: NONE - STREET YARD: 10' - MAX IMPERVIOUS SURFACE RATIO: 80% PROPOSED BUILDING: - BUILDING AREA (GFA): ±5,200 SF REQUIRED PARKING: 1 SPACE PER 250 SF PROPOSED PARKING: -TOTAL PROPOSED PARKING: 35 SPACES (30) STANDARD VACUUM SPACE (1) VAN ACCESSIBLE HANDICAP VACUUM SPACE (4) STANDARD SPACE (EMPLOYEE PARKING) LEGEND CONCRETE PAVEMENT LANDSCAPED AREA (SEE LANDSCAPE PLAN) CONCRETE SIDEWALK VACUUM MOTOR / EQUIP. VACUUM STATION VAC 1. SEE GENERAL NOTES, SHEET C-002. 2. ALL DIMENSIONS ARE MEASURED FROM FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE NOTED. 3. ALL CURB RADII MEASURED FROM FACE OF CURB TO FACE OF CURB UNLESS OTHERWISE SHOWN. 4. ALL PROPOSED CURB & GUTTER TO BE 18" BARRIER TYPE UNLESS SHOWN OTHERWISE. 5. ALL SIDEWALKS, STRIPING, & SIGNAGE TO BE ADA & MUTCD COMPLIANT. 6. THE CONTRACTOR SHALL FURNISH & INSTALL "HANDICAP PARKING" SIGNS WITH IDENTIFYING HANDICAPPED SYMBOL AT ALL HANDICAPPED PARKING STALLS. INCLUDE VAN ACCESSIBLE SIGN, WHERE APPLICABLE (SEE DETAILS). 7. THE CONTRACTOR SHALL FURNISH & INSTALL ALL SIGNS SHOWN IN ACCORDANCE WITH SCDOT & MUTCD SPECIFICATIONS. 8. ALL PARKING LOT STRIPING TO BE 4" WIDE TRAFFIC MARKING PAINT UNLESS OTHERWISE NOTED. ALL PAINT SHALL BE APPLIED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. 9. ITEMS TO BE PAINTED WHITE INCLUDE BUT NOT LIMITED TO: TRAFFIC ARROWS, STOP BARS, PEDESTRIAN CROSSINGS, NON ADA AISLES, & NON ADA PARKING STALLS. 10.ITEMS TO BE PAINTED YELLOW INCLUDE BUT NOT LIMITED TO: DOUBLE YELLOW, ROAD STRIPING, ETC. 11.ITEMS TO BE PAINTED BLUE INCLUDE BUT NOT LIMITED TO: HANDICAP PARKING STALLS, HANDICAP SYMBOLS, HANDICAP ACCESS AISLES, & ADA CROSSING AREAS. 12. CONTRACTOR TO REMOVE AND REPLACE DAMAGED SIDEWALK OR CURB & GUTTER ALONG PROPERTY FRONTAGE AS NECESSARY. 13. SIDEWALK AND CURB AND GUTTER TO BE REMOVED AND REPLACED FROM JOINT TO JOINT. 14.IN PRESENCE OF SIDEWALK OR OTHER ADA PATHWAYS, ACCESS(ES) TO PROVIDE A MINIMUM OF 3' WIDE PEDESTRIAN PATH OF NO GREATER CROSS SLOPE THAN 2%. 15. REFER TO THE LANDSCAPE PLAN FOR PROPOSED PLANTINGS IN BUFFERYARDS, LANDSCAPE ISLANDS, ETC. 16. CONTRACTOR TO COORDINATE LOCATION OF BOLLARDS WITH THE OWNER/DEVELOPER. 17. CONTRACTOR TO REFER TO ARCHITECTURAL PLANS FOR SITE LIGHTING. 18. CONTRACTOR TO REFER TO OWNER'S EQUIPMENT PLAN & COORDINATE LOCATION OF EQUIPMENT WITH THE OWNER/DEVELOPER. SITE NOTES: 31 20' BUILDINGSETBACK LINE FLAG POLE D:\Jacob Rice\Time to Shine\Goose Creek\Plan Set\Plan Set for ARB_8.2.21.dwgAug 02, 2021 - 4:36pmPrinted By:Alden 803.760.3437 14 CALENDAR CT. COLUMBIA, SC 29206 NOTE: THIS SCALE APPLIES FOR SHEETS ONLY24"x36" 1 INCH = FT GRAPHIC SCALE 020' 10' 20' 20 LOT SUMMARY: ADDRESS: 539 ST JAMES AVE., GOOSE CREEK, SC 29445 TMS #: 234-00-00-153 TOTAL PROJECT SITE AREA: ±1.26 ACRES ZONING: GENERAL COMMERCIAL - EXISTING LAND USE: VACANT COMMERCIAL - PROPOSED USE: AUTOMOBILE SERVICE STATION (AUTOMATED CAR WASH) LOT REQUIREMENTS: - SETBACKS: FRONT - 20', REAR - 20', & SIDE - 10' - BUFFER YARDS: NONE - STREET YARD: 10' - MAX IMPERVIOUS SURFACE RATIO: 80% PROPOSED BUILDING: - BUILDING AREA (GFA): ±5,200 SF REQUIRED PARKING: 1 SPACE PER 250 SF PROPOSED PARKING: -TOTAL PROPOSED PARKING: 35 SPACES (30) STANDARD VACUUM SPACE (1) VAN ACCESSIBLE HANDICAP VACUUM SPACE (4) STANDARD SPACE (EMPLOYEE PARKING) LEGEND CONCRETE PAVEMENT LANDSCAPED AREA (SEE LANDSCAPE PLAN) CONCRETE SIDEWALK VACUUM MOTOR / EQUIP. VACUUM STATION VAC 32 VAC VAC D:\Jacob Rice\Time to Shine\Goose Creek\Plan Set\Plan Set for ARB_8.2.21.dwgAug 03, 2021 - 5:52pmPrinted By:Alden 803.760.3437 14 CALENDAR CT. COLUMBIA, SC 29206 NOTE: THIS SCALE APPLIES FOR SHEETS ONLY24"x36" 1 INCH = FT GRAPHIC SCALE 020' 10' 20' 20 PLANT SCHEDULE BOTANICAL NAME LIVE OAK OR APPROVED EQUAL AMERICAN HOLLY OR APPROVED EQUAL SABAL PALM OR APPROVED EQUAL LITTLE GEM MAGNOLIA OR APPROVED EQUAL INDIAN HAWTHORNE OR APPROVED EQUAL PODACARPUS OR APPROVED EQUAL LIGUSTRUM OR APPROVED EQUAL SYMBOL CAL SIZE QTY 2.5" 1" 1.5" 1.5" 3 GAL. 3 GAL. 3 GAL. 8-10' HT 6' HT 6' HT 6' HT 5 5 4 6 11 36 49 1. THE CONTRACTOR IS RESPONSIBLE FOR HIS OR HER OWN QUANTITIES. IF THERE IS A CONFLICT BETWEEN QUANTITIES AND SPACING, SPACING SHALL PREVAIL. 2. ALL TREES AND SHRUBS SHALL BE MULCHED (2-3" IN DEPTH) WITHIN TWO DAYS AFTER PLANTING, MULCH SHALL COVER THE AREA OF THE PLANTING PIT, BED, OR SAUCER, AROUND EACH PLANT. 3. ANY AREA DISTURBED DURING CONSTRUCTION NOT COVERED BY NEW CONSTRUCTION, SODDING, AND OR PLANT BEDS SHALL BE PERMANENTLY GRASSED. AS SPECIFIED AT NO ADDITIONAL COST TO THE OWNER. 4. ALL PLANTS SHALL MEET THE STANDARDS AND SPECIFICATIONS OF THE AMERICAN STANDARD FOR NURSERY STOCK, LATEST EDITION. 5. ALL PLANTINGS SHALL IN BE ACCORDANCE WITH THE LATEST CITY OF GOOSE CREEK LANDSCAPE ORDINANCES. LANDSCAPE NOTES: LEGEND CONCRETE PAVEMENT SOD / INTERNAL LANDSCAPING CONCRETE SIDEWALK VACUUM MOTOR / EQUIP. VACUUM STATION VAC LANDSCAPE REQUIREMENTS REQUIRED STREET YARD REQUIREMENTS STREET FRONTAGE TREES 2 CANOPY TREES OF A MINIMUM OF 2.5" CALIPER (8-10'HT.) REQUIRED FOR EACH 100 LF OF STREET FRONTAGE BUFFER YARD REQUIREMENTS BUFFER YARD PLANTINGS NONE REQUIRED (ADJACENT USE(S) IS COMMERCIAL / GC) OTHER REQUIREMENTS LANDSCAPE AREA SHALL BE 12% OF THE TOTAL AVAILABLE AREA. 10% OF PLANTINGS SHALL BE TREES OR 12 TREES PER ACRE, WHICHEVER IS GREATER LANDSCAPED ISLANDS SHALL BE PROVIDED FOR EVERY 10 SPACES. 1 CANOPY & 2 SHRUBS SHALL BE PLANTED IN ISLANDS SHRUBS MATURING TO 2' MIN. HEIGHT SHALL BE PLANTED AT 5' ON CENTER FOR THE ENTIRE LENGTH OF PROPOSED BUILDING FACADE FACING THE RoW 33 A1 FLOOR PLAN 1/8" = 1'-0"      n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      C1 OFFICE AREA DETAIL 1/8" = 1'-0" N 05 4 810 FEET 34 A1 SOUTH (OFFICE) ELEVATION 1/8" = 1'-0"      n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      A5 WEST (EXIT) ELEVATION 1/8" = 1'-0" B1 EAST (ENTRANCE) ELEV. 1/8" = 1'-0" B2 NORTH (TUNNEL) ELEVATION 1/8" = 1'-0" EXTERIOR FINISHES 05 4 810 FEET 35 A1 ENTRY ELEVATION 1/8" = 1'-0"        n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      05 4 810 FEET B1 EXIT ELEVATION 1/8" = 1'-0" 36 A1 OFFICE ELEVATION 1/8" = 1'-0"        n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      05 4 810 FEET B1 TUNNEL ELEVATION 1/8" = 1'-0" 37 A1 SITE PERSPECTIVE NO SCALE      n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      38 A1 SITE PERSPECTIVE NO SCALE      n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      39 A1 BUILDING PERSPECTIVE NO SCALE      n Fax Phone faldesco@gmail.com 4622 Chambliss Avenue K copyright 2021 584 584 865 865 le, T N . . vixo l © 97 . . 3 9 3139 7868 1 FALCONNIER      C1 BUILDING PERSPECTIVE NO SCALE A4 BUILDING PERSPECTIVE NO SCALE 40 Design Memorandum TO: Architectural Review Board FROM: Mark Brodeur, Planning and Zoning Director DATE: August 16, 2021 SUBJECT: Time to Shine Car Wash Dear ARB Members: I’d like to share some comments on this project. I am sharing because of the prominent corner of this proposal. The Site Plan This proposed Site Pan for the project has several admirable aspects that mitigate the usual issues associated with vehicular flow. Here is what is positive about the site plan.  The building mass is located at the intersection.  Vehicular connection to Plantation North shopping center.  A deep entry access to payment kiosk permits car stacking  A significant vehicle queue into wash car wash structure  Provided parking spaces are extra-wide to accommodate open door vacuuming  Plenty of parking spaces for individual car vacuuming  A drive thru “escape” lane Of course, there are always potential improvements that could improve on-site vehicular flow. I offer the following suggested modifications for ARB consideration.  Customer spaces would be easier to access if they were diagonal. Seniors have a more difficult time pulling into perpendicular parking spaces.  Coupled with diagonal spaces, the proposed two-way circulation would prove more problematic than a simple one-way flow. Subsequently, the aisle dimensions could be reduced and drivers only have to look in one direction before pulling out of the space.  Four employee/customer spaces may not be sufficient.  Place brick pilasters along the St. James and Plantation North frontages (see images below).  An alternate location for the dumpster should be considered or an upgraded design that is less utilitarian in nature. The Architecture The proposed building architecture needs considerable upgrading due to the prominence of the commercial intersection along St. James Avenue. Staff understands that car washes are mostly utilitarian, and that form follows function. However, that does not mean that Goose Creek needs to settle for uninspiring commercial design on an important corner. 41 Staff suggests that the ARB instruct the architect to return with another design proposal. Staff has reviewed three (3) other “Time to Shine” car washes in the Low Country and suggests that Goose Creek may not be receiving a very compelling design solution for this prominent location. Without delving into unnecessary negative commentary, the Planning Director suggests that the ARB instruct the architect to return with a design that is more in keeping with the current “Time to Shine” on Savannah Highway shown below. There are several reasons to do this.  Using an existing car wash design reduces costs of a total redesign.  A 2-Story building mass is preferred on this corner. The current proposal is a one-story with a tower element.  The design is fresh, clean and interesting. The proposed architecture is too gimmicky with its blue roofs and red trimmed shade canopies. This all needs to be toned-down a bit.  The brick accents compliment architecture on other corners. 42 TIME TO SHINE CARWASH – SAVANNAH HWY – STREET VIEW GOOGLE MAPS 43 TIME TO SHINE CAR WASH – S TIME TO SHINE CARWASH – SAVANNAH HWY. – STREET VIEW GOOGLE MAPS 44 TIME TO SHINE CARWAS – SAM RITTENBURG – STREET VIEW GOOGLE MAPS 45 TIME TO SHINE CARWASH – SAM RITTENBURG – REAR STREET VIEW GOOGLE MAPS 46 47 48 49 50 044270 75.00 08/02/2021 21 8 03015 250.80 250.80 238990 75.0008/02/2021 Property in Goose Creek Carnes Development Zone: Town Center Zone ~106’ Right of way Curb & Gutter 103” = 8.6’ 296” = 24.67’ Allowable Signage: As building is located 106’ from property line (see next page), the business is allowed 1.5 x frontage of 24.67 = 37 sq feet of signage. Embossed and painted. Cap over face Internal illumination. Quantity 1 Proposed Roof-Mounted Sign: Internally illuminated logobox cabinet 82.5” wide x 60” tall Sign Cabinet Square Footage: 34.4 2424 N. Main Street; Summerville, SC 29486 82.5” 60” 103” = 8.6’ 296” = 24.67’ Proposed Building Sign: Roof-Mounted Proposed Bracket (Engineer to provide specifications) 12’-3” Approx 24” Power Must be provided by others for roof-mounted sign. 120V on dedicated 20 amp breaker. Recommend electrician tying into timeclock. 2424 N. Main Street; Summerville, SC 29486 5” thick sign cabinet 60” tall cabinet Proposed Bracket as specified by enginner FASTENERS AS SPECIFIED BY ENGINEER FOR ATTACHMENT TO ROOF. Power Must be provided by others for roof-mounted sign. 120V on dedicated 20 amp breaker. Recommend electrician tying into timeclock. Proposed Roof-Mounted Sign: Bracket and Attachment Details RETAINER FASTENERS AS SPECIFIED BY ENGINEER FOR ATTACHMENT TO BRACKET BRACKET (AS SPECIFIED BY ENGINEER) Roof-Mounted Sign: Electrical Detail Overall Sq Footage: 108” x 60” = 45 sq feet Overall Sign Height: 2’ base + 5’ sign = 7’ tall Proposed Roadside Sign Proposed Monument – Construction Detail Double-Sided cabinet (12’ deep) Embossed Acrylic Faces Internally illuminated LED lighting Pole skirt Single-pole mounted (saddle mount) steel square tube center post Base of cabinet to be black Foundation Details (See Engineered Drawing) steel square tube center post (see engineered drawing for details) 3/8” through bolt to attach sign to steel post Saddle Mounting Detail 12” deep Right of way Curb & Gutter Roadside Sign Location (Option A: Preferred Location) A 6’ 10’ 10’ Power Must be provided for monument sign. 120V on dedicated 20 amp breaker. Recommend electrician tying into timeclock. Recommend leaving plastic conduit out of ground about 1.5’ with about 6’ of wire coiled up that we can run up through sign cabinet to power sign. 12.5’ from street curb

Source: City of Goose Creek website. First collected Oct 17, 2026.