I. CALL TO ORDER, PLEDGE OF ALLEGIANCE AND ROLL CALL
Chairperson Dresel called the meeting to order at 6 :30 p.m. and initiated the Pledge of
Allegiance. Mrs. Moneer initiated roll call.
Present: Ricky Dresel, Gary Becker, David Cantrill, Sharon Clopton, Mary
Kay Soto, Teri Victor
Absent: Jen Wise
Staff Present: Planning and Zoning Technician Brenda Moneer
II. APPROVAL OF MINUTES – MAY 17, 2021
Motion: A motion was made to accept the minutes as submitted. Moved
by Board Member Clopton, Seconded by Board Member
Cantrill.
Discussion: None.
Vote: All voted in favor (6-0). Motion carried.
III. MINOR APPLICATIONS – NEW BUSINESS
A. 2021-038 SIG: BLUE TEQUILA: 121 PLANTATION NORTH BLVD, UNIT A –
SIGNAGE
A representative was not present. The board revisited this item later in the meeting.
B. 2021-040 SIG: DREAM LEARNING ACADEMY: 100 S. GOOSE CREEK BLVD –
SIGNAGE
Mr. Hugh Welch with Carolina Moon Signs presented the application. He stated the sign
will be lowered to a height of 10 feet and will be printed vinyl. Mr. Welch stated the size
of the boxes will remain the same. Discussion regarding the line of vision for cars ensued
due to shrubbery and the sign being lowered. The board stated the address will need to
be inc luded on both sides of the sign. The board shared their concerns with how the
building will look. Concerns were raised as Mr. Welch stated Dream Learning Academy
have already installed new exterior doors for classrooms . The board stated this
modification did not come before them for approval.
2
Motion: A motion was made to table the decision on Dream Learning
Academy until the board receives information about their plans
for the exterior of the building. Moved by Board Member
Clopton, Seconded by Board Member Becker.
Discussion: Board Member Clopton stated if they are making changes to the
exterior of the building it needs to come before the board for
approval. She stated we need color and materials samples.
Board Member Dresel stated the board needs to see the
proposed signed with the renderings of the new building. It was
stated there is not a problem with the sign, they just want to see
how it fits with the building. It was stated the address needs to
be included in the new rendering of the signs.
Vote: All voted in favor (6-0). Motion carried.
C. 2021-041 SIG: CREEK CITY GRILL/WIDE AWAKE BREWING COMPANY: 101
BUTTON HALL – SIGNAGE
Mr. Hugh Welch with Carolina Moon Signs presented the application. He stated this is
a standard channel letter sign with white letter and black trim. The applicant is
looking to have two (2) different signs as these are two (2) different businesses. Mr.
Welch stated the building is a hundred feet long. He stated o ne (1) sign is fifty -one
(51) square feet and the other is forty-six (46) square feet.
Motion: A motion was made to approve the application as submitted.
Moved by Board Member Clopton, Seconded by Board
Member Cantrill.
Discussion: It was inquired if a street sign was also being proposed. Mr .
Welch stated no, as of right now only the building signs are being
proposed.
Vote: All voted in favor (6-0). Motion carried.
IV. NEW BUSINESS: MAJOR APPLICATIONS
A. 2021-042 RENO: MILLER CONWAY LAWYERS: 124 S. GOOSE CREEK BLVD –
SECOND FLOOR ADDITION RENOVATION
Mr. Adam Ferrara with Ferrara Buist Contractors presented the application. He stated
they are proposing adding a second floor to the top of the Miller Conway Lawyers as a
continuation of the Goose Creek Family Dentistry that was already approved. He
presented a rendering of what the board already approved. He stated they are
continuing this to the back half of the building.
3
The board was concerned with utilities and HVAC. The applicant stated there is only
one HVAC that will be added to the back half of the building. The applicant stated
shrubbery will be added to match what has already been approved to screen the new
HVAC unit. The board inquired if an emergency exit will be added from the lawyer’s
office. Mr. Ferrara stated they are adding a single stair inside. He stated there is not
enough occupant load to require two sets of stairs.
Mrs. Moneer read Mr. Brodeur’s Staff Report into the record.
The Site Plan:
It may not be readily apparent, but the Site Plan for this project remains the same. The
existing parking on-site is adequate to allow the additional building square footage.
The Architecture:
The proposal before ARB is to extend the recently approved s econd floor over the
entire first floor. You may recall, the previous submittal was for a second floor over the
Dentist office only.
Staff extended the deadline of the submittal of this project to accommodate the
applicant. Unfortunately, we cannot comment on the architecture of the second floor
because we have yet to see a color rendering of what the building will look like with a
FULL second floor.
ARB approved the partial second floor with conditions to strengthen the appearance
of the building. Staff recommends that the ARB take a critical look at this new second
floor extension and require the same level of quality that was suggested for the first
half.
Recommendation:
Staff recommends that the ARB consider placing the same type of requirements on this
half of the second floor that were required on the first half. These include a beefier
cornice, window surrounds and other window enhancements.
Board Member Dresel shar ed his concerns. He stated he feels the application is
incomplete. He stated it is basically the same drawing we looked at last time just
transposed over. Location of HVAC, landscaping, and signage details are not presented
on the rendering provided. Board Member Dresel stated an extension was given for the
submission and these details still were not added. Board Member Becker agreed with
Board Member Dresel.
The applicant stated we took all the guidance that was approved for the prior submittal
and included it on this application. He stated we did not have the HVAC on the prior
submittal, we demonstrated where it was going to be placed and how we were going
to protect it with shrubbery and that was okay. The applicant apologized for no t
providing a color rendering. He stated the focus is not to put something up that is
haphazard and rushed. He stated the entire goal is not build the project twice. He stated
he is trying to be reasonable and fair to the project and the business owners.
4
Board Member Dresel stated we want to keep the businesses in mind also, but with
that kind of urgency he would have expected a c omplete application. Last time we
asked for landscaping and got it on the second submission of that project, he stated he
would have expected it on the first submission this time.
The applicant asked what the board wants to see regarding screening for HVAC. Board
Member Becker made a few suggestions regarding bushes, fencing, or materials that
match the building.
Motion: A motion was made to deny the application until current
elevations are provided showing in detail their proposal.
Moved by Board Member Clopton, Seconded by Board
Member Becker.
Discussion: Board Member Becker stated the resubmission should include
screening. Board Member Clopton stated we want to see more
detail.
Vote: Board Member Dresel, Board Member Becker, Board Member
Clopton, Board Member Soto and Board Member Victor voted in
favor. Board Member Cantrill opposed (5-1). Motion carried.
The board revisited 2021-038 SIG BLUE TEQUILA. Mrs. Moneer stated the applicant did
request to present their application via zoom. She stated we are no longer doing zoom
presentations. Mrs. Moneer stated staff calculated that each sign is really 45.7 square feet
in total which is an allowable amount because of the width of the building. She stated
they are allowed 97.2 square feet of signage; this brings them to 91.46 with both signs.
Motion: A motion was made to accept the application as submitted.
Moved By: Board Member Soto, Seconded By: Board Member
Victor.
Discussion: There was none.
Vote: All voted in favor (6-0). Motion carried.
V. CLOSING REMARKS AND ADJOURNMENT
The board resumed discussion regarding the second -floor addition to Miller Conway
Lawyers. Board Member Cantrill inquired how to clarify screening for HVAC. Mrs.
Moneer stated screening should complemen t the primary structure. Mr. Brian Cook ,
Assistant City Administrator, introduced himself. He stated we are looking to redo the
Zoning Ordinance in the near future. He stated we will be looking specifically at
potential overlay districts for the city . He stated i deally, we will create a design
guideline booklet that is either specific to the entire city or specific to the overlay
district if Council approves it.
5
Motion: A m otion was made to adjourn ( 7:36p.m.) Moved By: Board
Member Becker, Seconded By: Board Member Victor.
Discussion: There was none.
Vote: All voted in favor (6-0). Motion carried.