RecordWell Data

Waterfront Advisory Committee — Agenda Packet

City of Beaufort · Beaufort County · General · meeting of Jul 6, 2026 · Agenda packets

Open the original document More from City of Beaufort

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF BEAUFORT WATERFRONT ADVISORY COMMITTEE MEETING AMENDED AGENDA 1911 Boundary Street, Planning Conference Room, Beaufort, SC 29902 July 6, 2026 at 5:00 pm Meetings will be live-streamed on the City of Beaufort’s YouTube Page; City Beaufort SC STATEMENT OF MEDIA NOTIFICATION In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, all local media was duly notified of the time, date, place, and agenda of this meeting. Please click the link below to join the Webinar: Join from PC, Mac, iPad, or Android: https://us02web.zoom.us/j/82600419485?pwd=x69pVPOz8LdEQ5BtCraXmcNaEtzKZy.1 Passcode:824262 +13052241968 Webinar ID: 826 0041 9485 I. Call to Order II. Pledge of Allegiance III. Meeting Agenda Approval IV. Approval of minutes from June 1, 2026 V. Discussions 1. Overview of Draft Request for Qualifications (RFQ) Tasks 2. Future Meeting Dates VI. Public Comment VII. Adjourn Waterfront Advisory Committee Meeting Minutes – Planning Conference Room, 1st Floor June 1, 2026 I. CALL TO ORDER 5:00 PM Mr. Oliver, Chair. Members in attendance – Scott Marshall, Joseph Oliver, David Russell, Josh Scallate, Josh Schott, Mike Sutton. Absent – David Bartholomew, Bill Suter. II. PLEDGE OF ALLEGIANCE Mr. Oliver, Chair. III. MEETING AGENDA APPROVAL Motion to approve was made by Councilman Scallate and seconded by Mr. Sutton. All were in favor, motion carried. IV. MINUTES A. May 4, 2026. Motion to approve was made by Mr. Russell and seconded by Councilman Scallate. Mr. Sutton abstained from the vote as he was not present for the meeting. Minutes approved as presented. V. DISCUSSIONS 1. Report on cost estimates for options to address Waterfront Park issues. Bill Barna with McSweeney Engineers and Duncan O’Quinn with O’Quinn Marine Construction were in attendance to answer the Committee’s questions and address their concerns. Mr. Barna presented and went over 4 options . Estimated costs for the various options ranged from $66,482,075.00 to $121,440,000.00. Their formal recommendation to the Committee was Option 2. Rebuild the Relieving Platform at a higher elevation. He stated this option provides the highest level of certainty with regards to performance, durability, and design life. Page 2 Mr. Barna spoke about the Estimated Benefit – Cost Ratio as it relates to elevation. He went over a few recommendations which included incorporating adaptive capacity to 9 feet into the design. All increments up to 9 feet are economically justified. Some of the topics discussed were about what elevation height should be used, and whether or not the city should a sk for a Request for Proposals on just a design, or should this be a design/build approach. Mr. O’Quinn feels a design/build is the way forward and the platform should be built up to 9 feet. Assistant City Manager, Eric Claussen, stated the challenges with a design/build concept is it excludes some funding sources. Staff will move forward with a Resolution to bring forward to Council that the Committee is supportive of Option 2 which would preserve as mu ch as possible the characteristics of the existing platform by occupying the same footprint, while using current technology and stronger materials for the supporting piles . This option raises the height of the promenade to address tide level concerns. A copy of the presentation is attached to these minutes. 2. Consideration of possible role for the Waterfront Advisory Committee in identifying and evaluation funding opportunities to meet costs of Waterfront Park project. Mr. Barna met with Assistant City Manager, Eric Claussen and JMT about grant opportunities that may be available. The question was asked if the grant funding role should be an item identified within the Req uest for Qualifica tions/Proposals application process. Having a grant writer on the team from the onset makes the most sense. Mr. Barna will let the Committee know if there is anything they can do in this area. VI. PUBLIC COMMENTS Howell Beach, Alternate Member of the Committee Paul Trask (written comments attached) Graham Trask Rob Cahill VII. EXECUTIVE SESSION Pursuant to Title 30, Chapter 4, Section 70 (a) (2) of the SC Code of Laws. “Discussion of negotiations incident to proposed contractual arrangements and proposed sale or purchase of property, the receipt of legal advice where the legal advice relates to a pending, threatened, or potential claim or other matters covered by the attorney-client privilege, settlement of legal claims, or the position of the public agency in other adversary situations involving the assertion against the agency of a claim” – Protect Beaufort Foundation V. the City of Beaufort. Mr. Sutton made a motion to go into Executive Session and seconded by Councilman Scallate. All were in favor, motion carried. Mr. Sutton made a motion to come out of Executive Session and seconded by Councilman Scallate. All were in favor, motion carried. Page 3 No actions from Executive Session. VIII. ADJOURN 7:29 PM Motion to adjourn was made by Mr. Sutton and seconded by Councilman Scallate. All were in favor, motion carried. EXECUTIVE SUMMARY Preserving the Promenade Henry C. Chambers Waterfront Park Relieving Platform Project CONSULTANT SCOPE OF SERVICES The City of Beaufort is preparing to advertise a Request for Qualifications to select a qualified multidisciplinary consultant team for the Preserving the Promenade – Henry C. Chambers Waterfront Park Relieving Platform Project. The scope focuses on advancing Option 2, the City’s preferred approach for restoring, strengthening, and improving the long -term resilience of the Waterfront Park promenade while preserving the historic character and public identity of Henry C. Chambers Waterfront Park. The City intends to select one prime consultant responsible for managing all subconsultants and delivering a coordinated design, permitting, grant, public engagement, bidding, and construction - support effort. The work may be authorized in phases based on f unding availability, regulatory approvals, federal environmental review requirements, and project readiness. The proposed scope is organized into four phases and twelve tasks: PHASE I Task 1 – Project Management and Coordination Provide overall project management, scheduling, meeting support, progress reporting, decision tracking, and risk management. Task 2 – Public Engagement and Communications Support Assist the City with public engagement, stakeholder coordination, meeting materials, website content, FAQs, graphics, and public-facing project updates. Task 3 – Existing Conditions Review and Project Summary Review prior reports, studies, inspection records, permit information, cost estimates, grant materials, historical documentation, utilities, and public comments to confirm the consultant’s understanding of Option 2 and identify next steps. Task 4 – Survey, Investigations, and Technical Analysis Perform surveys, geotechnical work, structural review, coastal and hydraulic analysis, utility review, environmental resource assessment, NEPA-support documentation, and construction-access evaluation. Task 5 – Preliminary Design Prepare preliminary design documents to advance and refine Option 2, including 30-percent plans, preliminary permit drawings, construction staging concepts, schedule updates, cost estimates, and presentations to City staff, the Waterfront Advisory Committee, and City Council as requested. Task 6 – Landscape Architecture Design Develop landscape and park-integration concepts that preserve the character of Henry C. Chambers Waterfront Park, including pedestrian circulation, accessibility, plantings, trees, lighting, seating, swings, railings, bollards, materials, and public-facing visual exhibits. Task 7 – Environmental Review, NEPA Support, and Permitting Prepare and coordinate permit applications, agency coordination materials, NEPA/EHP support documentation, Section 106 historic-preservation support, responses to agency comments, and final environmental commitments. Task 8 – Grant and Funding Strategy, Grant Writing, and Grant Administration Support Assist the City with identifying funding opportunities, preparing grant-readiness materials, developing benefit-cost and resilience documentation, supporting grant applications, coordinating with funding partners, and assisting with grant administration if funds are awarded. PHASE II Task 9 – Final Design and Construction Documents Prepare 60-percent, 90-percent, and final signed and sealed construction documents, including drawings, specifications, calculations, bid schedules, cost estimates, permit conditions, NEPA/EHP commitments, and supporting technical documentation. Task 10 – Cost Estimating, Value Engineering, and Funding Alignment Provide cost estimates at major design milestones and conduct value-engineering to evaluate cost savings, phasing opportunities, maintenance impacts, resilience benefits, permitting implications, schedule impacts, and funding eligibility. PHASE III Task 11 – Bid-Phase and Construction-Phase Services Support the City through bidding, contractor selection, construction administration, submittal review, RFIs, change-order review, payment application review, inspections, environmental and grant-compliance documentation, record drawings, and project closeout. PHASE IV Task 12 – Post-Construction Monitoring and Asset Management Provide post-construction inspection support, structural inspection and maintenance planning, post-storm inspection procedures, landscape warranty review, and long-term asset management recommendations. SUMMARY The overall purpose of this scope is to move the Preserving the Promenade project from preferred concept into a coordinated, fundable, permittable, constructible, and maintainable project. The scope is intended to restore safe public access, protect one of Beaufort’s most important civic spaces, support downtown businesses and tourism, preserve the character of Henry C. Chambers Waterfront Park, and improve the long-term resilience of the waterfront.

Source: City of Beaufort website. First collected Oct 17, 2026.