Waterfront Advisory Committee — Agenda Packet
City of Beaufort · Beaufort County · General · meeting of May 4, 2026 · Agenda packets
Open the original document More from City of Beaufort
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF BEAUFORT
WATERFRONT ADVISORY COMMITTEE MEETING AMENDED AGENDA
1911 Boundary Street, Planning Conference Room, Beaufort, SC 29902
May 1, 2026 at 5:00 pm
Meetings will be live-streamed on the City of Beaufort’s YouTube Page; City Beaufort SC
STATEMENT OF MEDIA NOTIFICATION
In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, all local media was
duly notified of the time, date, place, and agenda of this meeting.
Please click the link below to join the Webinar:
Join from PC, Mac, iPad, or Android:
https://us02web.zoom.us/j/83594238995?pwd=uEuoFMuxAKExqzNwAP8lZP8amvJoU2.1
Passcode:104985 +13052241968 Webinar ID: 835 9423 8995
I. Call to Order
II. Pledge of Allegiance
III. Meeting Agenda Approval
IV. Approval of minutes from April 13, 2026
V. Discussions
1. Review of Waterfront Park Design Concepts following Public Meeting Comments and Next Steps
2. Status of request to Council regarding grants/fundraising
VI. Public Comment
VII. Adjourn
Waterfront Advisory Committee
Meeting Minutes – Planning Conference Room, 1st Floor
April 13, 2026
I. CALL TO ORDER 5:00 PM
Mr. Oliver, Chair.
Members in attendance – Ben Coppage (Virtual), Scott Marshall, Joseph Oliver, David Russell,
Josh Scallate, Josh Schott, Bill Suter, Mike Sutton.
Absent – David Bartholomew
II. PLEDGE OF ALLEGIANCE
Mr. Oliver, Chair.
III. MEETING AGENDA APPROVAL
Motion to approve was made by Councilman Scallate and seconded by Mr. Suter.
All were in favor, motion carried.
Councilman Scallate stated the Agenda Packets should include more context relevant to the
discussions moving forward. He said if we are expecting updates on certain projects the materials
related to the said project should be available ahead of time both for the committee’s
consumption but also for the public.
IV. MINUTES
A. February 9, 2026.
Motion to approve was made by Councilman Scallate and seconded by Mr. Schott.
Mr. Oliver requested that the first sentence on page two be amended as follows:
Mr. Oliver feels the results of question 11 are incorrect as it treats responses that do not
indicate support for any vessel type as “skips” for purposes of calculating support percentages.
Minutes approved as amended.
V. FUTURE MEETING DATES
Future meeting dates are as follows: May 4, 2026, June 1, 2026, July 6, 2026 and August 3,
2026.
Page 2
VI. DISCUSSIONS
1. Status Updates.
A. Dinghy Dock – Mr. Marshall reported that this has been permitted with a completion date of
May 1, 2026.
B. Day Dock – Mr. Marshall stated staff will be bringing forth a contract to Council at the Regular
Meeting on April 14, 2026. The selected contractor was O’Quinn Marine. A July 1, 2026
completion date is anticipated.
C. Fencing – The new fencing arrived last week, and the contractor will start replacing the
sections within the next few days. The process should be completed by the end of this week.
2. Charrette Discussion.
A. Renderings by Engineers – Bill Barna with McSweeney Engineers and Duncan O’Quinn with
O’Quinn Marine started off by speaking about the Waterfront Day Dock and the modifications
that will be done to get it operational for patrons to use. An anticipated completion date
before July 1, 2026 , is expected . They spoke about the options regarding the Relieving
Platform Design and provided rendering s of what the concepts would look like. They
introduced several options that included repairing, build new and raise, raise platform and
enhance amenities. The committee’s questions were addressed on both topics. Copies of
those presentations are attached to the minutes.
There was a discussion about the Day Dock and whether money should be spent on what is
being considered a temporary fix to get it opened back up. Would the improvements being
made to the Dinghy Dock be enough to get us through? Do we have a federal obligation to
re-open the Day Dock? Mr. Marshall stated yes since it was partially funded with federal
funds.
3. Next Steps.
There will be a Waterfront Park Design Concepts Public Meeting on April 22, 2026, under the
Pavilion at the Henry C. Chambers Waterfront Park beginning at 5:00 pm. McSweeney
Engineers will give a formal presentation at 5:30 pm. In the event of inclement weather, the
event will be held in City Hall, First Floor Foyer. McSweeney Engineers, Davis and Floyd and
staff will be in attendance to answer questions and discuss the proposed design concepts.
VII. PUBLIC COMMENTS
Howell Beach, Alternate Member of the Committee
Rob Cahill
Pete Cotter
VIII. ADJOURN 7:02 PM
Motion to adjourn was made by Mr. Sutton and seconded by Councilman Scallate.
All were in favor, motion carried.
Waterfront Park Relieving Platform Consulting Services
Phase 2
Project Team
• Project Management
• Structural Engineering
• Inspections
• Structural Engineering
• Grant Facilitation/Research
• Permitting
• Adaptive Strategy Analysis
• Site Civil Engineering
• Surveying
• Geotechnical Engineering
• Materials Testing
• Constructability Reviews
• Cost Estimating
RE-ESTABLISH WATERFRONT ACCESS
MARINA DAY DOCK
KEY FEATURES:
• RE-USE OF EXISTING
PILES
• IPE TROPICAL
HARDWOOD DECKING
• STAINLESS AND
GALVANIZED
FASTENERS
• MARINE FENDERS
• DESIGNED FOR
GROUNDOUT
CONDITION
MARINA DAY DOCK
MARINA DAY DOCK STATUS
• PROJECT AWARDED TO O’QUINN MARINE CONSTRUCTION COMPANY , INC.
• SHOP DRAWINGS HAVE BEEN REVIEWED AND APPROVED
• WAITING ON FINAL PERMIT AUTHORIZATION
RE-ESTABLISH WATERFRONT ACCESS
WATERFRONT PARK DAY DOCK
KEY FEATURES:
• NEW GANGWAY
SUPPORT PLATFORM
• NEW 6’x45’ GANGWAY
• NEW 6’x75’ GANGWAY
WATERFRONT PARK DAY DOCK
WATERFRONT PARK DAY DOCK STATUS
• O’QUINN MARINE CONSTRUCTION COMPANY , INC. WAS LOW BIDDER
• WAITING ON CITY COUNCIL APPROVAL
• WAITING ON FINAL PERMIT AUTHORIZATION
• EXPECTED OPENING PRIOR TO JULY 1, 2026
WATERFRONT PARK RELIEVING PLATFORM PROJECT
PHASE 2
DEVELOPMENT OF DESIGN CONCEPTS
• ORIGINAL INVESTIGATION DEVELOPED 8 ALTERNATIVES.
• THIS SCOPE WAS A DEEPER DIVE INTO THE 5 MOST FEASIBLE SCENARIOS
• DO NOTHING
• REPAIR
• REBUILD PLATFORM (SAME AS EXISTING)
• REBUILD WITH SEAWALL (FILL IT IN)
• HYBRID APPROACH
• THE INVESTIGATION FOCUSED ON A MORE DETAILED ANALYSIS OF COST,
MAINTENANCE, DESIGN LIFE AND PERMITTING CONSIDERATIONS.
• DEVELOP RENDERINGS TO FOSTER PUBLIC ENGAGEMENT AND INPUT.
REVIEW OF
RENDERINGS
BEAUFORT’S W A TERFRONT PARK PROJECT -
PERSERVING THE PROMENADE
Restoring Our History, Securing Our Future
EXISTING CONDITIONS: IDENTIFIED RISKS
EXISTING PLATFORM
ADDRESSING 50 YEARS OF ENVIRONMENTAL CHANGE : The promenade was built in 1974 at lower water levels; local relative sea
levels have risen approximately 7 inches since construction began.
MITIGATING INCREASED TIDAL IMPACT : Modern “King Tides” now reach the relieving deck and support structures far more
frequently than original 1970s designs anticipated, leading to accelerated structural decay ex. October 2025 King Tide event.
DETERIORATING SUBSTRUCTURE
COMMUNITY FEEDBACK: SHARED VISION
The following points represent the key findings and priorities identified by the Beaufort community through the survey process:
Visitation Frequency: Over 56% of respondents visit the park at least weekly.
Respondents identified their primary reasons for visiting as:
Relaxation and waterfront views.
Dining and shopping.
Events and festivals.
Reopen the Promenade ASAP: Residents want the walkway repaired and reopened.
Restore the Swings: The park’s most iconic and beloved feature.
Future Considerations :
Walkability/Connectivity: Better lighting and safer pathways connecting Bay Street.
Splash Pad: Significant interest in adding a water feature or splash pad for children to combat the Lowcountry heat.
INUNDATION LEVEL
INTERMITTENT FLOODING
DETERIORATING PILES
OPTION 1 REPAIR : STABILIZE THE WATERFRONT PROMENADE AND RESTORE ACCESS
This approach focuses on repairing the existing structure to restore existing access, but it does not address the following critical struc-
tural vulnerabilities and fiscal challenges :
Restore Access : by repairing structural issues such as severely deteriorated piles (e.g., pile jacketing ($$$), replace bad piles ($$$$$),
add new piles ($$$$$)).
Continuing flood risk : by maintaining the current height, the promenade will be subject to intermittent flooding (e.g., Spring tides
and storms).
Imminent failure : a repair of the current outdated structure is a highly limited, expensive, and short-term band aid because different
parts of the structure will continue to fail over time.
Construction Difficulty: Extremely difficult for a contractor to drive new pilings without destroying the existing platform.
Poor ROI : repairs will cost up to 75% (perhaps 100%) of the cost of a new structure.
SAME LEVEL AS EXISTING PLATFORM
INUNDATION LEVEL
PARK CONNECTIONS TO REMAIN
INTERMITTENT FLOODING
BEAUFORT’S W A TERFRONT PARK PROJECT -
PERSERVING THE PROMENADE
Restoring Our History, Securing Our Future
OPTION 2 BUILD NEW AND RAISE: A HIGH-PERFORMANCE ELEVATED PLATFORM
This comprehensive approach replaces the
failing structure with a modern design that
ensures safety, durability, and permanent
access for the community:
Create long-term resilience by building the
promenade above the 8ft flood level
Restore access by building a new
promenade and sea edge with the latest
methods
Ensure universal access with ramped
pathways and stairs to the raised
promenade
STRUCTURALLY SOUND CONCRETE PLATFORM RAISED PLATFORM
NEW CONNECTIONS
ADAPTIVE CAPACITY
TERRACED SEATING
BEAUFORT’S W A TERFRONT PARK PROJECT -
PERSERVING THE PROMENADE
Restoring Our History, Securing Our Future
OPTION 3 BUILD NEW AND RAISE: A RESILIENT SEAWALL AND SOLID FILL FOUNDATION
This comprehensive approach replaces the
failing structure with a modern design that
ensures safety, durability, and permanent
access for the community: :
Create long-term resilience by building the
promenade above the 8ft flood level
Restore access by building a new
promenade and sea edge with the latest
methods
Ensure universal access with ramped
pathways and stairs to the raised
promenade
SIGNIFICANT FILL AND
MONOLITHIC CONCRETE
NEW CONNECTIONS
BEAUFORT’S W A TERFRONT PARK PROJECT -
PERSERVING THE PROMENADE
Restoring Our History, Securing Our Future
OPTION 4 RAISE PLAT FORM AND ENHANCE AMENITIES : A TRANSFORMATIVE AND RESILIENT WATERFRONT
Integrated splash pad A direct response to community requests for family-friendly water features and interactive play spaces.
This hybrid approach pairs maximum structural resilience of Options II or III with the specific amenities requested by the community
to create a vibrant, world-class destination:
Community-driven amenities : Incorporates priorities from the community survey, including a new splash pad and expanded public
spaces designed for family-friendly, year-round use.
A generational investment : Structural resilience with a transformative public experience that will serve as a landmark for decades.
Certain park features and amenities can be phased over time.
BEAUFORT’S W A TERFRONT PARK PROJECT -
PERSERVING THE PROMENADE
Restoring Our History, Securing Our Future
OPTION 4 RAISE PLATFORM AND ENHANCE AMENITIES : A TRANSFORMATIVE AND RESILIENT WATERFRONT
Safe water access Designed for everyone from toddlers to seniors, the new dock provides a protected environment to enjoy the
riverfront from a fresh perspective.
Substantial flood protection : Elevating the entire platform above the 8ft flood level provides a higher degree of resilience, reducing
flood and wave risks significantly from King Tides and storms.
Enhanced water interaction : Features a new dock extending into the river, creating a direct connection for water-based recreation
and offering a unique perspective of the shoreline.
Dual-purpose gathering space : New water-facing amphitheater steps provide tiered seating for sunset viewing and community
events, shifting the focus toward the beauty of the river.
BEAUFORT’S W A TERFRONT PARK PROJECT -
PERSERVING THE PROMENADE
Restoring Our History, Securing Our Future
March 3, 2026
To: The Mayor and Council of the City of Beaufort:
On behalf of the Waterfront Advisory Committee, I am requesting that Council expand the scope
of the Committee’s charge to include exploration of grant opportunities for funding the
Waterfront Park reconstruction project (including any associated work on the marina premises).
The Committee has recently received, through the office of Congresswoman Nancy Mace, a list
of potentially available federal grants for the Waterfront Park project. In addition, we expect to
receive from the City’s consulting engineers, as a part of their scope of work, a list of potential
funding sources.
The resolution under which the Committee is currently operating (Resolution 2025/12, approved
May 13, 2025) defines the scope of the Committee’s charge to include activities related directly
to the physical work required for the reconstruction of the Park’s relieving platform and seawall
and, with respect to the marina, the current lease agreement as well as opportunities to enhance
public use of the facilities. The resolution does not mention activities related to grant or other
funding opportunities.
I believe the Committee’s work in arriving at recommendations for the Waterfront Park project
would be greatly assisted by having an evaluation of the identified funding possibilities to
determine which are feasible and may be available, and in what amounts. It will also be
important to know the qualifying criteria and the applicable terms and conditions of each
potential grant. In addition to assisting the Committee, this evaluation would also be a valuable
resource to the City as it determines a strategy for pursuing grant funding, including how
individual grants might be pursued in a coordinated fashion to reach a funding goal.
Accordingly, I am requesting that Council authorize the Committee to proceed with an
evaluation of identified funding sources, including, in coordination with the City Manager, the
use of such City or outside staff resources as may be required to perform this work efficiently.
Respectfully,
Joseph M. Oliver, Chairman
cc: Members of the Waterfront Advisory Committee