TOWN OF FORT MILL
PLANNING COMMISSION MEETING
September 15, 2026
205 North White Street
6:00 PM
[Pages 2-4]
CALL TO ORDER
APPROVAL OF MINUTES
1. Regular Meeting: August 18, 2026
The following press was notified of the meeting by email or fax in accordance with the Freedom of Information
Act: The Herald, CN2, WRHI, WSOC, and WBTV. The agenda was also posted at the entrance to Town
Hall the required length of time and on the Town website. The Town of Fort Mill is committed to assuring
accessibility with reasonable accommodation, of Town services and facilities for all individuals, in compliance
with federal law. Please contact the Town Manager’s Office at 803-547-2116 if you need assistance.
OLD BUSINESS
[Pages 5-74]
None
NEW BUSINESS
1. Annexation/Zoning Map Amendment Request: Holbrook Commercial Development
An ordinance annexing parcels currently or formerly known as York County Tax Map Numbers
738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00-062, containing approximately
8.254 acres +/- with a proposed zoning designation of Highway Commercial (HC).
ADJOURN
1
TOWN OF FORT MILL
PLANNING COMMISSION MEETING
August 18, 2026
205 N. White St
6:00 p.m.
Present:
Chairman Mark Kerr, Daniel Reynolds, Dawn Williams-Zabicki, Sarah Curtis,
Dan Stout Jr. Planning Director Penelope Karagounis, Planner Mia Pulczinski
Absent: Vice Chairman Matt Lucarelli, Jonathan Hutchinson
Guests: No attendees
CALL TO ORDE
R
Chairman Mark Kerr called the Planning Commission meeting to order at 6:04 p.m. on Tuesday,
August 18, 2026.
APPROVAL OF MINUTES
Chairman Mark Kerr asked for a motion to approve Planning Commission meeting minutes from
July 21, 2026. Commissioner Reynolds made the motion to approve with one edit to page 2 of
the agenda under the call to order section, changing the date from June to J uly. Commissioner
Williams-Z
abicki seconded the motion. The mot ion passed unanimously by a vote of 5-0.
OLD BUSINESS
1. Zoning Regul ation Text Amendment Reques t: Town of Fort Mill
Planning Director Penelope Karagouni s reintroduced the proposed text amendment to Amend
Article
2, Section 28 – Transportation Corridor Protection Overlay District (TCO) to add the
Pennies 5 (2024) Pennies for Progress projects listed. The TCO will protect a portion of the US
21 corridor from Highway 160 to Sutton Road and Fort Mill Parkway from the railroad bridge to
Holbrook Road with a proposed minimum 170’ buffer to mitigate potential future development
in the buffer. At the request of the Planning C ommission, Ms. Karagounis provided clarification
regarding the use of the word “minimum” in the proposed buffer. She stated that Deputy
Planning Director Joey Adams-Raczkowski had reached out to Patrick Hamilton from York
County Pennies for Progress, who stated that minimum was used because a larger right of way
may be needed in certain cir cumstances, but it would not be known until the project is designed.
Commissioner Curtis asked whether 170’ was adequate in previous Pennies projects. Planning
Director P
enelope Karagounis stated that she did not have specific metrics, however, if 170’ was
not enough spac
e for a buffer in previous projects, it likely would have already been widened.
2
With no further discussion, Chairman Kerr called for a motion. Commissioner Williams-Zabicki
made a motion to recommend approving the text amendment as presented. Commissioner Curtis
seconded the motion. The motion passed unanimously, by a vote of 5-0.
NEW BUSINESS
None
INFORMATION AND DISCUSSION
Planning Director Penelope Karagounis reminded the commissioners to keep up with their
continuing education hours and that there would be a virtual continuing education class on
August 20, 2026.
ADJOURNMENT
With no further business, Commissioner Stout Jr. made a motion to adjourn the meeting.
Commissioner Curtis seconded the motion. The motion of adjournment was approved
unanimously by a vote of 5-0.
The meeting adjourned at 6:15 pm.
Respectfully submitted by Mia Pulczinski, Planner
August 19, 2026
3
PLANNING COMMISSION MEETING
AUGUST 18, 2026
ATTENDANCE SHEET
Name Address
EKddE^
4
Meeting Information
Meeting Type Planning Commission
Meeting Date September 15, 2026
Request Summary
Request Type Action (Old Bus.) X Action (New Bus.) Info/Discussion
Public Hearing Executive Session Other
Case Summary
Case Type X Annexation X Rezoning Text Amendment
Subdivision Plat Appearance Review Other
Property Information
Applicant Ashok Patel
Property Owner Charles A. Wilson, Susan L. Haire, Cheyenne Dena
Property Location Intersection of Fort Mill Parkway and Holbrook Road
Tax Map Number Currently or formerly known as 738 -00-00-063, 738-00-00-097, 738 -00-00-
004, and a portion of 738-00-00-062
Acreage 8.254 +/- acres
Current Zoning RMX-10 (York County)
Proposed Zoning HC, Highway Commercial
Existing Use Residential
Title
Nee
An ordinance annexing York County Tax Map Number(s) 738-00-00-063, 738-00-00-097, 738-00-
00-004 and a portion of 738-00-00-062 containing approximately 8.254 +/- acres located at the
intersection of Fort Mill Parkway and Holbrook Road, including the Right-of-Way.
Background Information
Subject Parcels The proposed annexation of parcels is to be designated as HC, consists of the
entirety of York County Tax Map Number(s) 738-00-00-063, 738-00-00-097, 738-
00-00-004 and a portion of 738 -00-00-062. These parcels comprise of 8.254 +/-
acres. The current zoning in York County for these four parcels is RMX-10
(Residential Mixed 10).
Neighboring
Uses
Direction Zoning Existing Use
North RMX-10 Single-Family Residential – York County
South HC Service & Commercial - Fort Mill
East RMX-10 Single-Family Residential/Undeveloped – York
County
West HC Single-Family Residential/Undeveloped – Fort Mill
5
Zoning
Summary
The York County Residential Mixed 10 District (RMX-10) is intended to provide for
a diversity of housing types at variable, moderate densities based on residential
land use, on lots generally with a minimum area of 10,000 square feet. This zoning
district is applied principally to undeveloped parcels where housing type and
density flexibility will compliment existing residential neighborhoods, and where
public water and sewer is readily available.
The ap
plicant has requested a zoning designation of Highway Commercial (HC)
upon annexation into the Town of Fort Mill.
It is the intent that parcels within the HC zoning district be developed and
reserved primarily as a retail service and commercial area, serving surrounding
neighborhoods and larger community or citywide clientele with a wide range of
commercial services,
including retail, offices and business support services
located in areas which are well served by collector and arterial street facilities as
well as pedestrian access facilities where appropriate.
It should be noted that upon successful annexation, the entirety of the property
under consideration will be located within the COD -N, Corridor Overlay District.
Thus, future development on these parcels shall conform to the COD-N standards
as enumerated within the Town of Fort Mill Zoning Ordinance.
Comprehensive
Plan
The subject propert ies are located within areas that ha ve been designated as
“Neighborhood Center” and “Single Family Residential” on the Town of Fort Mill’s
Future Land Use Map.
The pu
rpose of the “Neighborhood Center” land use category is to complement
surrounding residential areas by providing small centers with local goods and
services in a walkable community that residents visit daily. The design and scale
of the development encourages active living through a comprehensive and
interconnected network of walkable streets.
The purpose of the “Single Family Residential” land use category is to support low-
to moderate -density residential development, primarily consisting of single -
family detached homes.
6
Traffic Impact A Traffic Mitigation Agreement (TMA) was entered into as of July 10, 2026 for the
proposed annexation. This TMA indicates improvements needed at Fort Mill
Parkway and Holbrook Road/N Dobys Bridge Road, Fort Mill Parkway and Haire
Road, Fort Mill Parkway and Williams Road, Holbrook Road and Access 1, Fort Mill
Parkway and N Dobys Commercial Access 2, and Haire Road and Access 3, as well
as pedestrian and bicycle improvements to the Study Area.
As stated in the TMA, any off -site transportation improvements deemed
necessary by the Town and SCDOT would be the responsibility of the developer.
Fire Impact The properties are located approximately 0.8 mile (2 Minutes) ordinary driving
distance from Fort Mill Fire Station No. 2 on Fort Mill Parkway.
Utility Impact The applicant would be required to work with the Town of Fort Mill Utilities
Department to determine all improvements necessary to serve the properties.
Nothing in this report shall be deemed a guarantee that water and/or sewer
service/capacity will be available at the time of development.
School Impact The applicant’s request would not provide any additional impact to the Fort Mill
School District.
Discussion The properties are contiguous to the town limits and are, therefore, eligible for
annexation.
Alternatives
1. Recommend approval of the annexation request with a zoning designation of HC.
2. Recommend approval of the annexation request with an alternate zoning designation.
3. Recommend denial of the annexation request.
7
Staff Contact
Name & Title Penelope Karagounis, Planning Director
Department Planning Department
Date of Request September 15, 2026
Legislative History
Planning Commission 09/15/26: Scheduled
First Reading 10/26/26: Tentative
Public Hearing 10/26/26: Tentative
Second Reading TBD
Effective Date Upon a pproval and adoption of the annexation ordinance by Fort Mill
Town Council
Attachments
• Aerial Image
• Zoning Map
• Transportation Impact Analysis (TIA) prepared by Kimley Horn
• Transportation Mitigation Agreement
• Draft Ordinance
8
Aerial Image
9
Zoning Map
10
Holbrook Commercial Development
Transportation Impact Analysis Update
Fort Mill, South Carolina
Prepared for:
Town of Fort Mill
March 2026
© Kimley-Horn and Associates, Inc., 2026
11
12
i
TABLE OF CONTENTS
Page No.
1.0 EXECUTIVE SUMMARY 1
2.0 INTRODUCTION 5
3.0 EXISTING TRAFFIC CONDITIONS 9
3.1 STUDY AREA 9
3.2 EXISTING TRAFFIC 10
4.0 FUTURE BACKGROUND CONDITIONS 13
4.1 HISTORICAL GROWTH TRAFFIC 13
4.2 APPROVED OFF-SITE DEVELOPMENTS 13
4.3 PLANNED TRANSPORTATION PROJECTS 15
5.0 FUTURE BUILD-OUT CONDITIONS 18
5.1 SITE ACCESS 18
5.2 TRAFFIC GENERATION 18
5.3 SITE TRAFFIC DISTRIBUTION AND ASSIGNMENT 19
5.4 2029 BUILD-OUT TRAFFIC VOLUMES 19
6.0 VEHICULAR CAPACITY ANALYSIS 23
6.1 FORT MILL PARKWAY AND WHITES ROAD/HARRIS TEETER CENTER ACCESS 1 27
6.2 FORT MILL PARKWAY AND S DOBYS BRIDGE ROAD/HARRIS TEETER CENTER ACCESS 2 28
6.3 FORT MILL PARKWAY AND HOLBROOK ROAD/N DOBYS BRIDGE ROAD 29
6.4 FORT MILL PARKWAY AND HAIRE ROAD 31
6.5 FORT MILL PARKWAY AND WILLIAMS ROAD 33
6.6 WILLIAMS ROAD AND N DOBYS BRIDGE ROAD 34
6.7 HOLBROOK ROAD AND PUBLIC STORAGE DRIVEWAY/EXISTING DRIVEWAY (ACCESS 1) 35
6.8 FORT MILL PARKWAY AND N DOBYS COMMERCIAL ACCESS 2/ACCESS 2 36
7.0 AUXILIARY TURN-LANE WARRANTS 38
8.0 PEDESTRIAN AND BICYCLE OPERATIONS ANALYSIS 39
9.0 TRAFFIC SIGNAL WARRANTS 45
10.0 COMPLIANCE WITH ADOPTED TRANSPORTATION PLANS 45
11.0 MITIGATION IMPROVEMENTS 46
APPENDIX 49
13
ii
List of Figures
Page No.
FIGURE 1.1 – IDENTIFIED MITIGATION IMPROVEMENTS 4
FIGURE 2.1 – STUDY AREA/SITE LOCATION 7
FIGURE 2.2 – PROPOSED SITE PLAN 8
FIGURE 3.1 – EXISTING ROADWAY LANEAGE 11
FIGURE 3.2 – 2025 EXISTING PEAK HOUR TRAFFIC VOLUMES 12
FIGURE 4.1 – 2029 BACKGROUND AM PEAK-HOUR TRAFFIC VOLUMES 16
FIGURE 4.2 – 2029 BACKGROUND PM PEAK-HOUR TRAFFIC VOLUMES 17
FIGURE 5.1 – SITE TRAFFIC DISTRIBUTION AND ASSIGNMENT 20
FIGURE 5.2 – 2029 BUILD-OUT AM PEAK-HOUR TRAFFIC VOLUMES 21
FIGURE 5.3 – 2029 BUILD-OUT PM PEAK-HOUR TRAFFIC VOLUMES 22
FIGURE 6.1 – BACKGROUND AND BUILD-OUT/BUILD-OUT IMPROVED LOS 26
FIGURE 11.1 – IDENTIFIED MITIGATION IMPROVEMENTS 47
List of Tables
Page No.
TABLE 3.1- STUDY AREA ROADWAYS 9
TABLE 4.1 – APPROVED OFF-SITE DEVELOPMENTS 14
TABLE 5.1 – TRIP GENERATION 19
TABLE 6.0-A –VEHICULAR LOS CONTROL DELAY THRESHOLDS FOR INTERSECTIONS 24
TABLE 6.0-B – ADOPTED LOS STANDARD 25
TABLE 6.1 – FORT MILL PARKWAY AND WHITES ROAD/HARRIS TEETER CENTER ACCESS 1 27
TABLE 6.2 – FORT MILL PARKWAY AND S DOBYS BRIDGE ROAD/HARRIS TEETER CENTER ACCESS 2 28
TABLE 6.3 – FORT MILL PARKWAY AND HOLBROOK ROAD/N DOBYS BRIDGE ROAD 29
TABLE 6.4 – FORT MILL PARKWAY AND HAIRE ROAD 31
TABLE 6.5 – FORT MILL PARKWAY AND WILLIAMS ROAD 33
TABLE 6.6 – WILLIAMS ROAD AND N DOBYS BRIDGE ROAD 34
TABLE 6.7 – HOLBROOK ROAD AND PUBLIC STORAGE DRIVEWAY/EXISTING DRIVEWAY (ACCESS 1) 35
TABLE 6.8 – FORT MILL PARKWAY AND N DOBYS COMMERCIAL ACCESS 2/ACCESS 2 36
TABLE 6.9 – HAIRE ROAD AND ACCESS 3 37
TABLE 8.0 – PEDESTRIAN LOS THRESHOLDS FOR INTERSECTIONS 39
TABLE 8.1 – PEDESTRIAN OPERATIONS 40
TABLE 8.2 – BICYCLE LOS THRESHOLDS 42
TABLE 8.3 – BICYCLE OPERATIONS 43
14
Holbrook Commercial Development
Transportation Impact Analysis Update
1
1.0 Executive Summary
The purpose of this Transportation Impact Analysis (TIA) Update is to evaluate the impacts on the
surrounding transportation infrastructure as a result of the updated Holbrook Commercial
development proposed by Ashok Patel. The primary objectives of the study are:
⚫ To estimate trip generation and distribution for the proposed development.
⚫ To perform vehicular, pedestrian, and bicycle operations analyses for each of the identified
study intersections.
⚫ To determine the potential transportation impacts of the proposed development.
⚫ To identify improvements to mitigate the proposed development’s transportation impacts.
The proposed Holbrook Commercial development is located in the southeast quadrant of the
intersection of Fort Mill Parkway and N Dobys Bridge Road/Holbrook Road in Fort Mill , South
Carolina. Based on the site plan provided by the developer, the proposed development is currently
envisioned to include of the following land uses and intensities:
⚫ 13,600 square-foot (SF) strip retail plaza
⚫ 9,000 SF high-turnover sit-down restaurant
⚫ 2,500 SF fast-food restaurant with drive through
⚫ 600 SF fast-food restaurant with drive through and no indoor seating
⚫ 2,500 SF coffee/donut shop with drive through
The site is planned to be completed (built -out) in 2029. Based on the provided site plan, the
proposed development will be accessed as follows:
⚫ Access 1 – Full-movement connection to Holbrook Road aligned with Public Storage
Driveway approximately 340 feet south of Fort Mill Parkway.
⚫ Access 2 – Right-in/right-out (RIRO) connection to Fort Mill Parkway aligned with the future
N Dobys Commercial Access 2 approximately 575 feet east of Holbrook Road.
⚫ Access 3 – Entrance-only connection to Haire Road approximately 120 feet south of Fort
Mill Parkway.
A TIA Scoping Meeting was held on November 6, 2025 with the Town and developer, and the
scope and parameters to be included in this TIA were finalized December 17, 2025. A TIA Scoping
Document was developed based on agency and developer coordination prior to, during, and after
this meeting that outlined the scoping parameters to be used for the TIA and was reviewed and
agreed upon by the Town of Fort Mill, South Carolina Department of Transportation (SCDOT), York
County, and the developer.
The following AM and PM peak -hour scenarios were analyzed to determine the proposed
development’s transportation impacts on the surrounding network:
⚫ 2025 Existing Conditions
⚫ 2029 Background Conditions
⚫ 2029 Build-out Conditions
This TIA evaluates the vehicular, pedestrian, and bicycle operations in each of the scenarios above
for the following study area intersections:
1. Fort Mill Parkway and Whites Road
2. Fort Mill Parkway and S Dobys Bridge Road
3. Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
4. Fort Mill Parkway and Haire Road
15
Holbrook Commercial Development
Transportation Impact Analysis Update
2
5. Fort Mill Parkway and Williams Road
6. N Dobys Bridge Road and Williams Road
7. Holbrook Road and Public Storage Driveway/Access 1
8. Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
9. Haire Road and Access 3
For purposes of this study, Fort Mill Parkway was assumed with east -west orientation between
Whites Road and Haire Road and with north-south orientation at Williams Road.
Transportation impacts and mitigation requirements were determined in accordance with the traffic
study guidelines in the SCDOT Access & Roadside Management Standards (ARMS) Manual and
Town of Fort Mill TIA Ordinance. As such, this report presents trip generation, distribution, vehicular
capacity analysis, auxiliary turn lane warrant review, and multimodal capacity analyses.
Based on the analyses contained herein, the following improvements are identified to mitigate the
impact of the proposed development on the surrounding transportation infrastructure:
Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
⚫ Construct a northbound right-turn lane along Holbrook Road with 100 feet of storage and
appropriate taper.
⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage
and appropriate taper.
Fort Mill Parkway and Haire Road
⚫ Construct a southbound right-turn lane on Haire Road with 75 feet of storage and
appropriate taper. Cost sharing with other area projects should be considered as applicable
for this improvement.
⚫ Construct a westbound left-lane with 150 feet of storage and appropriate taper.
Fort Mill Parkway and Williams Road
⚫ Construct a westbound right-turn lane with 100 feet of storage and appropriate taper. Cost
sharing with other area projects should be considered as applicable for this improvement.
Holbrook Road and Access 1
⚫ Construct Access 1 to include a single ingress lane, single egress lane, stop control, and
a 70-foot internal protected stem (IPS).
⚫ Per SCDOT, construction of a southbound left -turn lane along Holbrook Road is required.
This lane is recommended to be constructed with 150 feet of storage and appropriate taper.
⚫ Install Do Not Block Intersection signage/striping along the northbound approach of
Holbrook Road.
Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
⚫ Construct Access 2 to include a single right-in ingress lane, a single right-out egress lane,
and a 30-foot IPS . Per coordination with SCDOT, an acceleration lane along Fort Mill
Parkway would be involved, with presumed yield control.
⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage
and appropriate taper.
Haire Road and Access 3
⚫ Construct Access 3 to include a single ingress lane.
16
Holbrook Commercial Development
Transportation Impact Analysis Update
3
Study Area Pedestrian and Bicycle Improvements
⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage
and in the development’s roadway improvement areas along Fort Mill Parkway and
Holbrook Road (within 500 feet), and five -foot-wide sidewalks along the site’s frontage
otherwise.
⚫ Install crosswalks /markings and pedestrian ramps/truncated dome mats across the site
accesses as appropriate.
The mitigation improvements should be coordinated with the other improvements planned at the
study intersections to the extent possible.
The mitigation improvements identified within the study area are shown in Figure 1.1 . The
improvements shown on this figure are subject to approval by SCDOT, Town of Fort Mill, and York
County as applicable. All additions and attachments to the public roadway system shall be properly
permitted, designed, and constructed in conformance to standards maintained by the agencies. It
is noted that the site -civil engineer is responsible for confirming that the proposed access points
meet current sight distance standards.
17
Figure 1.1Holbrook Commercial Development
Transportation Impact Analysis Update Identified Mitigation Improvements
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
Existing Lane
Storage Length
Stop Control
Traffic Signal
X'
Fort Mill Parkway
225'
425'300'
525'
350'
250'
350'
325'
150'
525'
275'
350'
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Access 3
Access 2 N Dobys Comm.
Access 2
Access 1
150'
100'
100'
100'
150'
Maximize
Study Area Pedestrian and Bicycle Improvements
- Incorporate a minimum 8’ multi-use path along the site’s Fort Mill Parkway
frontage and in roadway improvement areas along Fort Mill Parkway and
Holbrook Road (within 500’), and 5’ wide sidewalks along the site’s frontage
otherwise.
- Install crosswalks/markings and pedestrian ramps/truncated dome mats
across the site accesses as appropriate.
Background Improvements
Recommended Improvements
Internal Protected StemIPS
SITE
100'
50'
100'
100'
75'
100'
150'
150'
Recommended Cost Sharing
Install "Do Not
Block Intersection"
signage/striping
70' IPS
30' IPS
100'
18
Holbrook Commercial Development
Transportation Impact Analysis Update
5
2.0 Introduction
The purpose of this TIA Update is to evaluate the impacts on the surrounding transportation
infrastructure as a result of the updated Holbrook Commercial development proposed by Ashok
Patel. The primary objectives of the study are:
⚫ To estimate trip generation and distribution for the proposed development.
⚫ To perform vehicular, pedestrian, and bicycle operations analyses for each of the identified
study intersections.
⚫ To determine the potential transportation impacts of the proposed development.
⚫ To identify improvements to mitigate the proposed development’s transportation impacts.
The proposed Holbrook Commercial development is located in the southeast quadrant of the
intersection of Fort Mill Parkway and N Dobys Bridge Road/Holbrook Road in Fort Mill, South
Carolina. Figure 2.1 shows the site location. Based on the site plan provided by the developer, the
proposed development is currently envisioned to include of the following land uses and intensities:
⚫ 13,600 square-foot (SF) strip retail plaza
⚫ 9,000 SF high-turnover sit-down restaurant
⚫ 2,500 SF fast-food restaurant with drive through
⚫ 600 SF fast-food restaurant with drive through and no indoor seating
⚫ 2,500 SF coffee/donut shop with drive through
The site is planned to be built -out in 2029. Figure 2.2 shows the proposed site plan provided by
the developer. Based on the provided site plan, the proposed development will be accessed as
follows:
⚫ Access 1 – Full-movement connection to Holbrook Road aligned with Public Storage
Driveway approximately 340 feet south of Fort Mill Parkway.
⚫ Access 2 – Right-in/right-out (RIRO) connection to Fort Mill Parkway aligned with the future
N Dobys Commercial Access 2 approximately 575 feet east of Holbrook Road.
⚫ Access 3 – Entrance-only connection to Haire Road approximately 120 feet south of Fort
Mill Parkway.
The 5.90-acre site currently features a residential usage and is not zoned within the Town of Fort
Mill, requiring an annexation/rezoning request, Town Commercial Appearance Review , and
SCDOT encroachment permit approval.
A TIA Scoping Meeting was held on November 6 , 2025 with the Town and developer, and the
scope and parameters to be included in this TIA were finalized December 17, 2025. A TIA Scoping
Document was developed based on agency and developer coordination prior to, during, and after
this meeting that outlined the scoping parameters to be used for the TIA and was reviewed and
agreed upon by the Town of Fort Mill, SCDOT, York County, and the developer. The approved TIA
Scoping Document is included in the Appendix.
The following AM and PM peak -hour scenarios were analyzed to determine the proposed
development’s transportation impacts on the surrounding network:
⚫ 2025 Existing Conditions
⚫ 2029 Background Conditions
⚫ 2029 Build-out Conditions
19
Holbrook Commercial Development
Transportation Impact Analysis Update
6
Based on coordination prior to and at the scoping meeting, this TIA evaluates the vehicular,
pedestrian, and bicycle operations in each of the scenarios above for the following study area
intersections:
1. Fort Mill Parkway and Whites Road
2. Fort Mill Parkway and S Dobys Bridge Road
3. Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
4. Fort Mill Parkway and Haire Road
5. Fort Mill Parkway and Williams Road
6. N Dobys Bridge Road and Williams Road
7. Holbrook Road and Public Storage Driveway/Access 1
8. Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
9. Haire Road and Access 3
For purposes of this study, Fort Mill Parkway was assumed with east -west orientation between
Whites Road and Haire Road and with north-south orientation at Williams Road.
The study area was based on the Town of Fort Mill TIA Ordinance (Section 8, No. 2019-03), which
states “At a minimum, the study area shall include all streets and signalized intersections within a
one-mile radius of the proposed site and/or where site traffic estimated for build -out of the project
will constitute 10% or more of any signalized intersection approach during one or both peak hours.
During the Scoping Meeting, staff may reduce the radius due to conditions specific to the site based
on request by developer and supported with valid reasoning. Unsignalized intersections between
the required signalized intersections will be added to the scope as directed by the Town.”
Kimley-Horn was retained to determine the potential transportation impacts of this development in
accordance with the traffic study guidelines in the SCDOT ARMS and the Town of Fort Mill TIA
Ordinance; and to identify transportation improvements that may be required to mitigate these
impacts. This report presents trip generation, distribution, vehicular and multimodal analyses, and
identified transportation improvemen ts required to mitigate anticipated transportation demands
produced by the subject development.
20
Figure 2.1Holbrook Commercial Development
Transportation Impact Analysis Update Study Area/Site Location
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Construction Driveway
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
Existing Lane
Storage Length
Stop Control
Traffic Signal
X'
Fort Mill Parkway
325'
425'300'
525'
350'
250'
350'
325'
150'
525'
275'
350'
1
2
3
5
6
9
SITE
8
4
7
1.Fort Mill Parkway and Whites Road
2.Fort Mill Parkway and S Dobys Bridge Road
3.Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
4.Fort Mill Parkway and Haire Road
5.Fort Mill Parkway and Williams Road
6.N Dobys Bridge Road and Williams Road
7.Holbrook Road and Public Storage Driveway/Access 1
8.Fort Mill Parkway and N Doby Commercial Access 2/Access 2
9.Haire Road and Access 3
Legend
- Study Area Intersections
-Site
NOT TO
SCALE
21
Figure 2.2Holbrook Commercial Development
Transportation Impact Analysis Update Proposed Site Plan
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Construction Driveway
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
Existing Lane
Storage Length
Stop Control
Traffic Signal
X'
Fort Mill Parkway
325'
425'300'
525'
350'
250'
350'
325'
150'
525'
275'
350'
22
Holbrook Commercial Development
Transportation Impact Analysis Update
9
3.0 Existing Traffic Conditions
Existing traffic conditions were coordinated with Town of Fort Mill and SCDOT staff and collected
through field observations and turning -movement counts to establish the existing conditions
baseline analysis.
3.1 STUDY AREA
Figure 3.1 shows the current roadway geometry at the existing study intersections.
The primary roadways in the vicinity of the site are:
⚫ N Dobys Bridge Road – classified by SCDOT as a minor arterial
⚫ Fort Mill Parkway, Williams Road, S Dobys Bridge Road, and Holbrook Road – classified
by SCDOT as major collectors
Table 3.1 describes existing conditions for portions of the se roadways within the vicinity of the
study area as well as on -line data research including section type, 2024 SCDOT annual average
daily traffic (AADT) in vehicles per day (vpd), and posted speed limit in miles per hour (mph).
Table 3.1- Study Area Roadways
Roadway Section type 2024 AADT Posted speed limit
Fort Mill Parkway 2-lane undivided 18,500 W of Whites Road 45 mph
Williams Road 2-lane undivided 1,950 35 mph
N Dobys Bridge Road 2-lane undivided 6,800 N of Fort Mill Pkwy 35 mph
S Dobys Bridge Road 2-lane undivided 15,400 40 mph
Holbrook Road 2-lane undivided Not Available 40 mph
Haire Road 2-lane undivided Not Available 25 mph
The following is a description of existing pedestrian and bicycle accommodations at the study area
intersections:
Fort Mill Parkway
• Sidewalk along the south side of Fort Mill Parkway between S Dobys Bridge Road and
Holbrook Road/N Dobys Bridge Road
N Dobys Bridge Road
• Sidewalk along the east side of N Dobys Bridge Road between Williams Road and just
north of Nims Lake Road
• Sidewalk along the west side of N Dobys Bridge Road between Doby Bridge Park and just
south of Williams Road
Fort Mill Parkway and S Dobys Bridge Road
• Pedestrian signal heads and push buttons for each approach, but no marked crosswalks .
Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
• Pedestrian signal heads and push buttons for each approach, but no marked crosswalks.
Fort Mill Parkway and Williams Road
• Push buttons to facilitate crossing the eastbound and westbound approaches, but no
pedestrian signal heads or marked crosswalks.
23
Holbrook Commercial Development
Transportation Impact Analysis Update
10
Pedestrian and bicycle needs have been identified within the Rock Hill-Fort Mill Area Transportation
Study (RFATS) Bike Walk Plan as later discussed in Section 4.3.
3.2 EXISTING TRAFFIC
Turning movement counts (TMCs) were collected on Thursday, April 10, 2025 from 6:30-9:00 AM
and 3:00-7:00 PM at the following intersections:
⚫ Fort Mill Parkway and Whites Road
⚫ Fort Mill Parkway and S Dobys Bridge Road
⚫ Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
⚫ Fort Mill Parkway and Williams Road
TMCs were collected on Wednesday, December 10, 2025 from 6:30-9:00 AM and 3:00-7:00 PM at
the following intersections:
⚫ N Dobys Bridge Road and Williams Road
⚫ Fort Mill Parkway and Haire Road
⚫ Holbrook Road and Public Storage Driveway
The observed AM and PM peak hour of each individual intersection was used as the baseline data
to represent the highest collected traffic volumes within the specified count timeframes. Note that
the Town’s TIA Ordinance requires counts to be collected from 6:30 -9:00 AM and 3:00 -7:00 PM,
stating ‘The PM count timeframe is expected to cover peaking characteristics caused by local
Middle and High School dismissal times, as well as typical employment peaking characteristics.’
It should be noted that construction traffic for the Catawba Ridge Market (Harris Teeter)
development was recorded along future HT Access 1 aligned with Whites Road and future HT
Access 2 aligned with S Dobys Bridge Road. Access 1 construction traffic was not considered for
this analysis since signal heads to control the movements in/out of the construction access were
not in place at the time of the counts. The construction traffic recorded at HT Access 2 was
considered for the existing analysis as signal heads were observed to be in place and operating.
The construction traffic was removed for the future year analysis and only the approved Catawba
Ridge Market site trips are considered in 2029 Background and 2029 Build -out conditions.
Additionally, construction traffic at the intersection of Fort Mill Parkway and Haire Road was
observed during the AM and PM peak periods. Based on review of the TMCs, this traffic was
removed from the existing conditions. This volume modification is included in the Appendix, with
the existing TMC data for reference.
Volume balancing was performed along the following segments:
⚫ Fort Mill Parkway between Whites Road and Williams Road, excluding the section between
S Dobys Bridge and N Dobys Bridge due to the presence of a driveway.
⚫ Holbrook Road between Fort Mill Parkway and Public Storage Driveway.
⚫ Williams Road between N Dobys Bridge Road and Fort Mill Parkway.
Volume balancing was not performed between the remaining study area intersections d ue to the
presence of streets/driveways.
Figure 3.2 shows the 2025 existing AM and PM peak -hour traffic volumes. Raw peak -hour
intersection TMC data is provided in the Appendix.
24
Figure 3.1Holbrook Commercial Development
Transportation Impact Analysis Update Existing Roadway Laneage
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Construction Driveway
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
Existing Lane
Storage Length
Stop Control
Traffic Signal
X'
Fort Mill Parkway
325'
425'300'
525'
350'
250'
350'
325'
150'
525'
275'
350'
25
6 5
1 2 3 4
7
4
562
54
2
35
421
30 28
(90)
(594)
(2)
(307)
(18)
5 (10)
777 499 51 (68)
(555)
252
22
4
0
0
2 2
18
0
14 14
369
2
3265 191 (525)
622
168
291
(608)
(252)
(578)
(576)
(0)
582
514
543
0
416
(113)
(416)
(0)119 397(136)
604
3
3
4(1)
297
157
40
61
(228) (66)
(77)
(27)
(1)
(0)
(1)
45
89
9
14
18364
(926)
(239)
(676)
(4)
(0)
(4)
(349)
(388)
(56)
(7)
(105)
334
(495)
(0)
(11)
(26)
(23)
(92)
(117)
(164)
10
(2)
(51)
(25)
41
(103)
(35)
(18)
(678)
(13)
2
50 28
98
34
(23)
(56)
(30)
(3)
(7)
(1)
(602)
(18)
280
39
17
286
11 15
(20)
(516)
(34)
(425)
(51)
Figure 3.2Holbrook Commercial Development
Transportation Impact Analysis Update
2025 Existing
Peak-Hour Traffic Volumes
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Construction Driveway
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
AM Peak-Hour Traffic Volumes
PM Peak-Hour Traffic Volumes
Stop Control
Traffic Signal
(XX)
XX
Fort Mill Parkway
26
Holbrook Commercial Development
Transportation Impact Analysis Update
13
4.0 Future Background Conditions
Projected background (non -project) traffic is defined as the expected growth or change in traffic
volumes on the surrounding roadway network between the year the existing counts were collected
and the expected build -out year ( 2029) absent the construction and opening of the proposed
project. This includes both non-specific general growth based on historical increases in local traffic
volumes (historical growth), and specific growth and/or change in traffic volumes caused by future
off-site developments that are not yet fully -constructed; and/or planned transportation projects
specifically identified within the horizon year and vicinity of the proposed development.
4.1 HISTORICAL GROWTH TRAFFIC
Historical growth is the increase in existing traffic volumes due to usage increases and non-specific
growth throughout the area, and accounts for growth that is independent of specific off-site
developments or planned transportation projects . Historical growth traffic is calculated using an
annual growth rate, which is applied to the existing traffic volumes up to the future horizon year. As
shown in the approved TIA Scoping Document, an annual growth rate of 2.1% was applied to the
2025 peak-hour traffic volumes over four years to calculate 2029 historical growth traffic volumes.
4.2 APPROVED OFF -SITE DEVELOPMENT S
Based on the TIA Scoping Document, five approved offsite developments within the vicinity of this
study area were included in the 2029 background traffic. These developments, land uses and
intensities, and build-out percentages are outlined in Table 4.1.
Offsite approved development traffic volumes were taken directly from each respective TIA .
Existing intersection splits were used to carry and assign volumes appropriately at study area
intersections that were not included in the approved TIAs listed in Table 4.1.
27
Holbrook Commercial Development
Transportation Impact Analysis Update
14
Table 4.1 – Approved Off-Site Developments
Development Land Use/Intensity
(per TIA)
Approx % Built-out
2025/2029 portion^
Build-out
year per TIA TIA Required Improvements
Catawba Ridge
Market
Ref: 014007043
10k SF Vet Clinic
19.7k SF Strip Retail
61k SF Supermarket
7k SF Small Strip Outlot
4.59k SF Fast Food with Drive-Thru
4.6k SF Fast Food with Drive-Thru
14 VFP C-Store/Gas Station
4k HTSD Restaurant
1.9k Drive-In Bank
0%/100% 2026 2-24
Fort Mill Parkway/Whites Road:
-EBL w/150’
-SBL w/100’ and SBR w/100’ (HT D/W)
-Addl WBT that drops at HS DW #2
Fort Mill Parkway/S Dobys Bridge Road:
-EBL w/150’
-SBL w/100’ and SBTR (Harris Teeter D/W)
-Addl NBL w/525’
-Addl WBT that drops at HS DW#2
N Dobys
Commercial
Ref: 014007027
3.6k SF Medical-Dental Office
9.6k SF Shopping Center
7.2k SF restaurant
2.5k SF fast food
0%/100% 2027 05-22 None in study area
Catawba Ridge HS
(FKA FMHS #3)
Ref: 018577001
1,600 student high school 100%/100%* 2019 4-16 None in study area
Cresswind Fort
Milll
Ref: 014007046
645 detached senior homes 0%/50% 2033 12-24
Fort Mill Parkway and Whites Road/HT
Access 1:
-EBR w/ 225’
-EBTR restriped to a through lane
Fort Mill Parkway and S Dobys Bridge/HT
Access 2:
-NBR w/ storage maximized ~250’ between
Fort Mill Parkway and existing driveway
Banks Road
Development
Ref: 014007009
12,500 SF daycare 0%/100% 2022 9-21 None in study area
^Based on January 2025 aerial imagery.
*FMHS #3 plans to have 1,600 students upon 2019 opening and gradually increase until it reaches full occupancy of 2,400 stude nts in
2031. Approximately 67 students will be added to the high school per year.
**Arden Mill Phase 2 excluded as currently recommended for denial by PC, and Williams Reserve (Mattamy) excluded due to Counc il
denial and potential for offsite improvements impacting this TIA.
It is noted that the southbound approach of N Dobys Commercial Access 2 is recommended to be
modified from what was previously recommended by SCDOT as feedback on the N Dobys
Commercial TIA and as recorded in the N Dobys Commercial Transportation Mitigation Agreement
(TMA).
Figures 4.1 and 4.2 show the projected 2029 background AM and PM peak -hour traffic volumes,
respectively, which include the existing plus historical growth traffic and future off-site development
trips.
28
Holbrook Commercial Development
Transportation Impact Analysis Update
15
4.3 PLANNED TRANSPORTATION PROJECTS
Based on review of online information regarding SCDOT and York County transportation projects
for the area, there are no known public projects funded/committed within the study area. However,
private development commitments are noted in Table 4.1.
The RFATS Bike Walk Plan shows th e following unfunded pedestrian and bicycle projects within
the study area:
⚫ Fort Mill Parkway/S Dobys Bridge Road - Spot Improvement
⚫ Fort Mill Parkway between Spratt Street and Holbrook Road – shared-use path
⚫ Fort Mill Parkway between Holbrook Road and Tom Hall Street – bike lane and sidewalk
⚫ N Dobys Bridge Road between Fort Mill Parkway and Tom Hall Street – shared-use path
⚫ Dobys Bridge Road between Fort Mill Parkway and US 521 – bike lane and sidewalk
The Fort Mill Parkway/S Dobys Bridge Road spot improvements are assumed to include high -
visibility crosswalks, median refuge, and pedestrian signalization as applicable (per Bike Walk
RFATS page 79). Due to the extent of the Harris Teeter Center/Catawba Ridge Market committed
improvements at Fort Mill Parkway/S Dobys Bridge Road, the spot improvements would be
anticipated to be incorporated into that project.
Town of Fort Mill Trails Master Plan shows the following recommended pedestrian and bicycle
projects within the study area:
⚫ Whites Road south of Fort Mill Parkway – side path
⚫ Dobys Bridge Road north of Fort Mill Parkway – side path
Town of Fort Mill Corridor Overlay District (COD) guidelines listed in Article II., Section 24.10 of the
Fort Mill Zoning Ord inance requires installation of eight -foot-wide shared use paths along lots
abutting public roads and roadway improvement areas (Fort Mill Parkway and along Holbrook Road
within 500 feet), and five-foot-wide sidewalks along the site’s frontage otherwise.
29
6 5
1 2 3 8 4
7
304
42
18
311
12 16
<411>
<42>
<18>
<383>
<12>
(107)
(0)
(0)
(72)
(0)
(20) <126>
(0) <16>
45 (0) <45> 37 (0) <37>
457
33 <33> (3) 30
11 (0) <11> 106
4
611
58
<28> (26) 2
<38> (0) 38
(76)
(3)
(0)
(63)
(12)
<533>
<36>
<4>
<674>
<70>
<15>
(42)
(36)
(40)
(16)
(56)
(59)
<295>
<28>
<15>
<50>
<28>
<42>
<36>
<40>
<16>
<56>
<59>
(0)
5
(4)
(11)
(50)
0
0
0 0 (24) <24>
<36>
<22>
<0>
(36)
(2)
(0)
(46)
424 (46)
274
24
4
0 363 (71)
(0) <5>
(21)
(28)
20
0
15 15 (0)
<470> 401 (44)
<46><434>
0
0 0
(63) <907> 542 (45) <587> 55 (3) <58>
4 (0) <4>
<445>
288 (15) <303> 208 (6) <214>
0
0
2 2 (62) <62> <15>
844
<32> (2) 30
<684> (8) 676
183
0
316 <592>
<37> (37) 0<77> (77) 0 <17> (17) 2
(27) 323
171
43
54
(65) 632
(33) 559
590
0
452 <350>
<697>
<730> (39) 691 <693> (37) 656
3
3
2
<4> (0) 4
(23)
(41)
(74)
(7)<146> (17) 129 <452> (21) 431
(0)
<209>
<51>
<339>
<631>
<74>
<459>
<192>
<45>
(0)
(0)
(0)<73> (7) 66
(21)
(2)
(26)
(51)
<2>
<54>
<106>
<54>
<3>
<3>
(5)
(9)
49
97
<76> (6) 70
<10> (0) 10
15
199
(0)
(17)
<15>
<216>
[-2]
[-2]
[-2]
Figure 4.1Holbrook Commercial Development
Transportation Impact Analysis Update
2029 Background AM
Peak-Hour Traffic Volumes
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
N Dobys Comm.
Access 2
Haire Road
LEGEND
Existing + Historical Growth Traffic
Approved Development Trips
Background Traffic Volumes
Stop Control
Traffic Signal
(XX)
<XX>
XX
Fort Mill Parkway
Removal of Construction Traffic[XX]
30
6 5
1 2 3 8 4
7 9
462
55
37
561
22 20
<580>
<55>
<37>
<642>
<22>
(118)
(0)
(0)
(81)
(0)
(23) <135>
(0) <20>
61 (0) <61> 38 (0) <38>
334
20 <57> (2) 55
25 (0) <25> 112
2
645
98
<2> (0) 2
<27> (0) 27
(114)
(2)
(0)
(74)
(19)
<448>
<22>
<2>
<719>
<117>
<8>
(68)
(63)
(43)
(23)
(94)
(85)
<433>
<69>
<22>
<77>
<27>
<68>
<63>
<43>
<27>
<94>
<89>
(0)
11
(8)
(14)
(77)
0
0
0 0 (30) <30>
<33>
<35>
<3>
(33)
(2)
(0)
(42)
688 (62)
422
61
8
0 603 (87)
(0) <11>
(11)
(27)
33
3
8 20 (0)
<750> 654 (60)
<42><690>
0
0 0
(23) <757> 538 (32) <570> 73 (2) <75>
1 (0) <1>
<714>
260 (24) <284> 571 (5) <576>
4
0
4 0 (82) <82> <20>
734
<15> (1) 14
<1,026> (20) 1,006
123
0
248 <661>
<33> (33) 0<90> (90) 0 <16> (16) 0
(36) 274
114
29
84
(78) 661
(35) 626
452
0
379 <310>
<739>
<812> (60) 752 <796> (59) 737
1
0
1
<1> (0) 1
(17)
(22)
(97)
(6)<179> (31) 148 <657> (29) 628
(0)
<140>
<62>
<265>
<474>
<97>
<385>
<135>
<31>
(0)
(0)
(0)<84> (12) 72
(21)
(2)
(17)
(62)
<1>
<31>
<197>
<84>
<1>
<0>
(3)
(19)
28
178
<108> (8) 100
<25> (0) 25
12
127
(0)
(15)
<12>
<142>
Figure 4.2Holbrook Commercial Development
Transportation Impact Analysis Update
2029 Background PM
Peak-Hour Traffic Volumes
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
N Dobys Comm.
Access 2
Haire Road
LEGEND
Existing + Historical Growth Traffic
Approved Development Trips
Background Traffic Volumes
Stop Control
Traffic Signal
(XX)
<XX>
XX
Fort Mill Parkway
31
Holbrook Commercial Development
Transportation Impact Analysis Update
18
5.0 Future Build-Out Conditions
Site traffic developed for this TIA is defined as the site-generated trips expected to be added to the
study area by the proposed development, and the distribution and assignment of that traffic to the
identified study area intersections.
5.1 SITE ACCESS
Based on the provided site plan, the proposed development will be accessed as follows:
⚫ Access 1 – Full-movement connection to Holbrook Road aligned with Public Storage
Driveway approximately 340 feet south of Fort Mill Parkway.
⚫ Access 2 – RIRO connection to Fort Mill Parkway aligned with the future N Dobys
Commercial Access 2 approximately 575 feet east of Holbrook Road.
⚫ Access 3 – Entrance-only connection to Haire Road approximately 120 feet south of Fort
Mill Parkway.
As shown in the SCDOT ARMS Manual, the minimum driveway spacing is 325 feet for roadways
with a posted speed limit of 45 mph (Fort Mill Parkway) and 275 feet for roadways with a posted
speed limit of 40 mph (Holbrook Road). 75 feet is required by York County for 30 mph with AADT
less than 2000 vpd (Haire Road).
It is noted that the site-civil engineer is responsible for confirming that the proposed access points
meet current sight distance standards.
5.2 TRAFFIC GENERATION
The traffic generation potential of the proposed development was determined using the trip
generation rates published in Trip Generation (Institute of Transportation Engineers, Eleventh
Edition, 2021). Based on the provided site plan, the proposed development is envisioned to consist
of the following land uses and intensities:
⚫ 13,600 square-foot (SF) strip retail plaza
⚫ 9,000 SF high-turnover sit-down restaurant
⚫ 2,500 SF fast-food restaurant with drive through
⚫ 600 SF fast-food restaurant with drive through and no indoor seating
⚫ 2,500 SF coffee/donut shop with drive through
Table 5.1 summarizes the projected trip generation for the proposed development. During a typical
weekday, the proposed development has the potential to generate 426 and 259 net new external
trips during the AM and PM peak hours, respectively.
Internally captured trips are trips that begin and end within the project site and do not access the
external roadway network. The National Cooperative Highway Research Program (NCHRP) Report
684 Enhancing Internal Trip Capture Estimation for Mixed -Use Developments, produced by the
Transportation Research Board, was used to calculate the internal capture, applied between the
office and retail components of the site. Internal capture calculations are included in the Appendix.
Pass-by trips are trips already on the roadway network that turn into and out of the site as they
pass by on the adjacent street. Pass-by volumes were calculated based on the equations and data
presented in the ITE Trip Generation Handbook. Pass-by volumes were limited to ten percent of
the adjacent street traffic. Pass-by calculations are included in the Appendix.
32
Holbrook Commercial Development
Transportation Impact Analysis Update
19
Table 5.1 – Trip Generation
5.3 SITE TRAFFIC DISTRIBUTION AND ASSIGNMENT
The proposed development’s trips were assigned to the surrounding network based on available
ADTs, prior studies, and surrounding land uses. The site traffic distribution and assignment shown
in Figure 5.1 was reviewed and approved by the Town of Fort Mill, SCDOT, York County, and the
developer.
5.4 2029 BUILD -OUT TRAFFIC VOLUMES
The 2029 build-out traffic volumes include the assignment of the projected site traffic generation
added to the 2029 background traffic volumes. Figures 5.2 and 5.3 show the projected 2029 build-
out traffic volumes for the AM and PM peak hours, respectively.
Intersection volume development worksheets for the identified study intersections are provided in
the Appendix.
AM Peak Hour PM Peak Hour
Total In Out Total In Out
Retail Land Uses 741 32 19 13 90 45 45
822 - Strip Retail Plaza (<40k) 13.6 KSF 741 32 19 13 90 45 45
Restaurant Land Uses 3,983 456 234 222 321 172 149
934 - Fast-Food Restaurant with Drive-Through Window 2.5 KSF 1,169 112 57 55 83 43 40
935 - Fast-Food Restaurant with Drive-Through Window and No Indoor Seating 1.0 LANE 515 43 20 23 60 31 29
932 - High-Turnover (Sit-Down) Restaurant 9.0 KSF 965 86 47 39 81 49 32
937 - Coffee/Donut Shop with Drive-Through Window 2.5 KSF 1,334 215 110 105 97 49 48
Subtotal 4,724 488 253 235 411 217 194
Internal Capture 372 8 4 4 74 37 37
ITE 934 Pass-By - 50% AM / 55% PM 614 54 27 27 38 19 19
ITE 935 Pass-By - 0% AM / 31% PM 80 0 0 0 16 8 8
ITE 932 Pass-By - 0% AM / 43% PM 207 0 0 0 24 12 12
ITE Pass-By 901 54 27 27 78 39 39
Adjacent Street Traffic 35,614 1,614 1,947
10% Adjacent Street Traffic 3,561 162 81 81 196 98 98
Pass-By 901 54 27 27 78 39 39
Total Net New External Trips 3,451 426 222 204 259 141 118
*ITE 935 does not provide daily rates; therefore, the average of the total AM and PM peak-hour trips was assumed to account for 10% of the daily trips.
Land Use
Table 5.1 - Holbrook Trip Generation
DailyIntensity Units
*
33
6 5
1 2 3 8 4
7 9
15%
45%
5%
(15%)
(5%)
(45%)
50%
5%
10%
(50%) (50%)
(5%)
(45%)
15%
50%
5%
15%
10%20%
10%
20%
(15%)
(30%)
(5%)
(15%)5%
(10%)
(20%)
30%
Figure 5.1Holbrook Commercial Development
Transportation Impact Analysis Update Site Traffic Distribution and Assignment
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Access 3
Access 2 N Dobys Comm.
Access 2
Haire Road
SITE
LEGEND
Site Traffic Distribution
Inbound Assignment
2024 SCDOT AADT
Stop Control
Traffic Signal
XX%
Outbound Assignment
(XX%)
Access 1
Fort Mill Parkway
XX%
XX
15%
5%
10%
5%
5%
45%
15%
18,500
18,900
6,800
15,400
7,600 10,600
11,800
34
6 5
1 2 3 8 4
7 9
(0)
411
42
18
383
12 16
(34)
(0)
(0)
(100)
(0)
<42>
<36>
<40>
<16>
(31)
(0)
(0)
(92)
(10)
<295>
<39>
<38>
<50>
<22>
<0>
<15>
(11)
(23)
(0)
(0)
(0)
(0)
(0)
(0)
(0)
(0)
(0)
5
(0)
0
36
16
56
59 62 (0)
42
36
40 24 (0) <24> <62>
303 (10) 214 (20)
907 (31) 587 (41) 58 (0)
<313>
<938>
<234>
<628>
0
(44) 592
631
74
459 (0) 32(0) 37(0) 17
(0) 452
(102) 693
<37>
<12>
0
80 (0) <0>
<105>
54
106
0 0 (92) {13}
{2}(10)
(0)
(0)
(11)
(0)
(0)
<16>
<211>
<15>
<452>
<636>
<17>
<350>
<51>
<209>
<146>
<717>
<77>
(0)
(0)
(11)(0) 146
(33) 684
209
51
339(0) 77
<10>
<0>
<76>
<54>
<104>
<35>
<56>
<59>
<631>
<74>
<481>
(0) 10
(0) 0
(0)
(0)
(33)
(22) 73<95>
(0)
(0)
(22)
15
216
0
0 (61)
(31)697
295
28
15
50 434
(0) 76
(0) 350
192
45
(44)
<261>
<445>
<42>
<11>
<45>
<564>
<36>
<58>
<426>
<5>
(0)
(0)
533
36
11 (0)
45 (0)
{-8}
<0>
<0>
<114>
<0>
<741>
<350>
<54>
<76>
(0)
(0)
(0)
(102)
0 (0)
{8}
<79>
54 <718> (0) 730
0
0
(67)
<8>
<119>
<46>
<28>
<0>
<36>
<4>
<795>
<32>
46 (0)
470 (0)
(0)
(0) 4
0
22
0
15
<462>
28
(0)
(0)
4
{-8}
{8}
(0)
(0)
(0)
<0>
<9>
3
3
2
(111)
15 (0)
445 (0)
<18>
<483>
<12>
<38>
<4>
<766>
<80>
<137>
<37>
4
674
70
(0) 28
(0) 38
(0) 33
<28>
<33>
126 (11)
(0)
37
{5}
{-5)
{-2}
{2}
{12}
{-8}
{-12}
{12}
<16>
<123>
<437>
<15>
0
9
(111)
(0)
<3>
<3>
<2> (0)
Figure 5.2Holbrook Commercial Development
Transportation Impact Analysis Update
2029 Build-Out AM
Peak-Hour Traffic Volumes
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Access 3
Access 2 N Dobys Comm.
Access 2
Haire Road
SITE
LEGEND
Background Traffic Volumes
Site Trips
Build-out Traffic Volumes
Stop Control
Traffic Signal
(XX)
<XX>
XX
Pass-By Trips
{XX}
Access 1
Fort Mill Parkway
35
6 5
1 2 3 8 4
7 9
580
55
37
642
22 20
<601>
<55>
<37>
<706>
<22>
(21)
(0)
(0)
(64)
(0)
(7) <142>
(0) <20>
61 (0) <61> 38 (0) <38>
448
22 <57> (0) 57
25 (0) <25> 135
2
719
117
<2> (0) 2
<27> (0) 27
(18)
(0)
(0)
(53)
(6)
<466>
<22>
<2>
<772>
<123>
<33>
<35>
<3>
<8>
(0)
(0)
(0)
(0)
(0)
(0)
<433>
<76>
<36>
<77>
<27>
<0>
<68>
<63>
<43>
<27>
<94>
<89>
(0)
11 (0) <11>
(0)
(7)
(14)
(0)
(0)
(0)
68
63
43 30 (0) <30> <675>
27
0
(0)
(0)
(0)
(0)
750 (0)
<42>
35
3
8 20 (0)
<735> 714 (0)757 (18) <775> 570 (24) <594> 75 (0) <75>
433
69
22
77 690 (0)
33 42
1 (71) <87>
<699>
284 (6) <290> 576 (11) <587>
27
94
89 82 (0) <82> {-15}
{-15}
{15}
{-15}
<20>
<90> (0) 90 <16> (0) 16
0 (0) <0>
15
(21) 1,026
140
62
265 <689>
<33> (0) 33
(0) 310
135
31
84
(28) 739
(28)
97
385
0
1
<1> (0) 1
0
0 <855> (59) 796661
474 <310>
<767>
<797> (0) 812
<15> (0)
<179> (0) 179 <657> (0) 657
(0)
<140>
<62>
<272>
<474>
<97>
<399>
<49>
(0)
(0)
(0)
(59)
(0)
(0)<98> (14)
1
(0)
(0)
<1>
<31>
<194>
<24>
<86>
<5>
<84>
<0>
<0>
<75>
<1>
<0>
{15}<185>
(7)
(0)
(0)
(14) 84
(35)
(18)
0
50 (0) <0>
(0)
(0)
(21)
(71)
(0)
31
197
0 0 (53)
0
2
<25> (0) 25
<0> (0) 0
12
142
0<108> (0) 108
(0)
(0)
(7)
(0)
(0)
<12>
<137>
<12>
<0>
<2>
<1,047>
{5}
{-5}
{3}
{20}
{-3}
{3}
{-15}
{15}
{16}
0 (6) <9>
<73>
0
<57> (42) 0
Figure 5.3Holbrook Commercial Development
Transportation Impact Analysis Update
2029 Build-Out PM
Peak-Hour Traffic Volumes
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Access 3
Access 2 N Dobys Comm.
Access 2
Haire Road
SITE
LEGEND
Background Traffic Volumes
Site Trips
Build-out Traffic Volumes
Stop Control
Traffic Signal
(XX)
<XX>
XX
Pass-By Trips
{XX}
Access 1
Fort Mill Parkway
36
Holbrook Commercial Development
Transportation Impact Analysis Update
23
6.0 Vehicular Capacity Analysis
Based on the requirements set forth by the Town of Fort Mill TIA Ordinance and in accordance with
the traffic study guidelines in the SCDOT ARMS manual, vehicular capacity analyses were
performed at the study area intersections for each of the following AM and PM peak-hour scenarios:
⚫ 2025 Existing Conditions
⚫ 2029 Background Conditions
⚫ 2029 Build-out Conditions
Vehicular capacity analyses were performed for the AM and PM peak hours using the Synchro
Version 12 software to determine the operating characteristics at the signalized and stop-controlled
intersections of the adjacent street network and to evaluate the impacts of the proposed
development. Capacity is defined as the maximum number of vehicles that can pass over a
particular road segment, or through a particular intersection, within a specified period of time under
prevailing operational, geometric and controlling conditions within a set time duration.
The Highway Capacity Manual (HCM) defines level-of-service (LOS) as a “quantitative stratification
of a performance measure or measures representing quality of service ” and is used to “translate
complex numerical performance results into a simple A -F system representative of travelers’
perceptions of the quality of service provided by a facility or service”. The HCM defines six levels
of service, LOS A through LOS F, with A having the best operating conditions from the traveler’s
perspective and F having the worst. However, it must be understood that “the LOS letter result
hides much of the complexity of facility performance”, and that “the appropriate LOS for a given
system element in the community is a decision for local policy makers”. According to the HCM, “for
cost, environmental impact, and other reasons, roadways are typically designed not to provide LOS
A conditions during peak periods but instead to provide some lower LOS that balances individual
travelers’ desires against society’s desires and financial resources. Nevertheless, during low -
volume periods of the day, a system element may operate at LOS A.”
LOS for a two -way stop-controlled (TWSC) intersection is determined by the control delay and is
reported for the side-street approaches, typically during the highest volume periods of the day, the
AM and PM peak periods. Control delay includes initial deceleration delay, queue move -up time,
stopped delay, and final acceleration delay. With respect to field measur ements, control delay is
defined as the total elapsed time from the time a vehicle stops at the end of the queue to the time
the vehicle departs from the stop line. It is typical for stop sign-controlled side streets and driveways
intersecting major streets to experience long delays during peak hours, particularly for left -turn
movements. The majority of the traffic moving through the intersection on the major street
experiences little or no delay.
LOS for signalized intersections is reported for the intersection as a whole, and typically during the
highest volume periods of the day, the AM and PM peak periods. One or more movements at an
intersection may experience a low level -of-service, while the intersection as a whole may operate
acceptably.
Table 6.0 -A lists LOS control delay thresholds published i n the HCM for unsignalized and
signalized intersections, respectively, as well as the unsignalized operational descriptions assumed
herein.
37
Holbrook Commercial Development
Transportation Impact Analysis Update
24
Table 6.0-A – LOS/Delay Thresholds [sec/veh]
LOS Signalized Unsignalized
A ≤ 10 ≤10
Short Delays B > 10 – 20 >10-15
C > 20 – 35 >15-25
D > 35 – 55 >25-35 Moderate Delays E > 55 – 80 >35-50
F > 80 >50 Long Delays
Traffic signal geometric plans were obtained from SCDOT for the intersections of Fort Mill
Parkway/S Dobys Bridge Road and Fort Mill Parkway/Holbrook Road/N Dobys Bridge Road, which
were used in the development of the existing conditions Synchro network. S ignal plans were not
available for the intersections of Fort Mill Parkway/Whites Road or Fort Mill Parkway/Williams Road;
therefore, SCDOT’s Synchro V11 defaults were used in the development of the existing conditions
Synchro network at these intersections . Available signal geometric plans are included in the
Appendix.
Cycle lengths, splits and offsets for the coordinated Fort Mill Parkway intersections with Whites
Road, S Dobys Bridge Road, and Holbrook Road/N Dobys Bridge Road were optimized in existing
conditions given the timing and volume inputs. Cycle lengths, spli ts, and offsets were optimized
again under background conditions to account for the additional laneage and approaches from the
Catawba Ridge Market and Cresswind Fort Mill approved developments. Under build -out
conditions, cycle lengths, splits, and offsets were maintained from background conditions.
Cycle lengths and splits were optimized under all studied conditions for the uncoordinated
intersection of Fort Mill Parkway and Williams Road.
Field-observed peak hour factors (PHFs) were used under existing conditions, while a PHF of 0.9
was used in future year analyses. Heavy-vehicle percentages collected with the counts were used
for existing conditions, subject to a two -percent minimum. A weighted heavy -vehicle percentage
was determined for future year conditions, subject to a two-percent minimum.
It is noted that overall intersection delay may decrease slightly from existing conditions to
background conditions. This can be attributed to the following:
• Signal timing optimization from existing time-of-day plans.
• The assumption of a PHF of 0.9 for future -year scenarios. The observed PHFs were
generally lower than 0.9; therefore, increasing them to 0.9 represents a more normal
distribution of vehicles over time, leading to less delay.
It is also noted that overall intersection delay may decrease slightly from background conditions to
build-out conditions. This can be attributed to the following:
• Signal timing optimization from background conditions.
• The addition of only major street through and right -turning traffic, which experiences less
delay than side street approaches and left -turn movements. Therefore, the increase in
through and right-turn movement trips drops the weighted average of delay.
Mitigation for vehicular traffic impacts caused by the proposed development were identified based
on Town of Fort Mill and SCDOT mitigation requirements. When determining the proposed
development’s traffic impact to the study area intersections, the 2029 build-out conditions were
38
Holbrook Commercial Development
Transportation Impact Analysis Update
25
compared to the 2029 background conditions. Based on the Town of Fort Mill TIA Ordinance ,
developer mitigation shall be required ‘if at least one of the following conditions exists when
comparing the multimodal operations of future year background conditions to future year build -out
conditions:
a. the total average delay at an intersection or individual approach increases by 25% or
greater, while maintaining the same LOS,
b. the LOS degrades by at least one level,
c. or the LOS does not meet the identified standard (as shown in Table 6.0-B) in background
conditions, and the proposed project shows a negative impact on the intersection or
approach.’
Table 6.0-C – Adopted LOS Standard
Table 6.0-B
Adopted LOS Standard
Intersection Type LOS Threshold
Involving only Collector or Local streets LOS C or better
Involving one or more Arterial or Higher Order streets LOS D or better
If the background LOS (intersection or approach) is inadequate, developer improvements are
expected to mitigate only the impact caused by the proposed site.
In addition, based on the SCDOT ARMS Manual, the TIA ‘should include proposed improvements
or access management techniques that will mitigate any significant changes in the levels of service.
For the purposes of this TIA, “significant changes” were assumed where the overall intersection or
stop-controlled approach delay increases by more than 25% or drops by one or more LOS grade
between 2029 background and 2029 build -out conditions. The District Traffic Engineer will be
responsible for final determination of mitigation improvements required to be constructed by the
applicant.’
Capacity analysis reports generated by Synchro Version 12 software are included in the Appendix
along with queuing and blocking reports generated by the SimTraffic microsimulation model. Figure
6.1 shows the resulting LOS of each studied intersection under background and build-out/improved
conditions as applicable.
Pedestrian and bicycle operations analyses are discussed in Section 8.0.
39
Figure 6.1Holbrook Commercial Development
Transportation Impact Analysis Update Background and Build-Out Improved LOS
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
Stop Control
Traffic Signal
X (X)
Fort Mill Parkway
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Access 3
Access 2 N Dobys Comm.
Access 2
Access 1
Background LOS AM (PM)
Build/Build Improved LOS AM (PM)
SITE
X (X)
C (C)
C (C)
D (E)
D (E)
C (D)
C (D)
D (F)
F (F)
B (C)
B (C)
D (E)
D (E)
C (C)
C (C)
B (B)
C (C)
B (A)
B (C)
C (D)
C (D)
40
Holbrook Commercial Development
Transportation Impact Analysis Update
27
6.1 FORT MILL P ARKWAY AND WHITES ROAD/ HT ACCESS 1
Table 6.1 summarizes the LOS, control delay (seconds), and 95th percentile queue lengths at the
signalized intersection of Fort Mill Parkway and Whites Road/HT Access 1.
Table 6.1 – Fort Mill Parkway and Whites Road/HT Access 1
As shown in Table 6.1, the overall intersection is projected to operate at LOS C or better under all
conditions analyzed. It should be noted that the southbound approach is projected to degrade from
LOS D to E during the AM peak hour and LOS E to F in PM peak hour. However, adjusting the
signal timing to provide 3 additional seconds of green time to HT Access 1 resolves this issue and
creates a slightly better delay overall as shown in the Build-out IMP row.
Based on review of the Synchro 95 th percentile queues, the southbound left -turn queues are
expected to exceed the available storage during the PM peak hour under background and build -
out conditions. Since the storage lengths are exceeded under both background and build -out
conditions and th e proposed site is not expected to significantly increase the queue lengths, the
turn lane is not recommended to be extended as developer responsibility.
EBL EBT EBR WBL WBTR NBL NBT NBR SBL SBT SBR LOS (Delay)
AM Peak Hour
LOS (Delay) B (18.2)
Synchro 95th Q - 298' - m37' m101' 361' - 230' - - -
LOS (Delay) C (23.3)
Synchro 95th Q 123' 401' 53' m230' m471' 264' 281' - 83' 73' 0'
LOS (Delay) C (26.6)
Synchro 95th Q 125' 425' 58' m252' m362' 261' 289' - #85' 72' 0'
LOS (Delay) C (25.7)
Synchro 95th Q 121' 411' 60' m253' m363' 252' 249' - 82' 72' 0'
PM Peak Hour
LOS (Delay) B (17.4)
Synchro 95th Q - 397' - m80' m219' 235' - 244' - - -
LOS (Delay) C (30.0)
Synchro 95th Q 128' 605' 95' m254' m314' 209' 361' - #124' 121' 26'
LOS (Delay) C (30.9)
Synchro 95th Q 128' 623' 97' m273' m314' 209' 369' - #128' 121' 26'
LOS (Delay) C (31.6)
Synchro 95th Q 134' 648' 108' m281' m317' 206' 358' - #122' 121' 26'
150' 225' 425' 325' 100' 100'
Table 6.1 - Fort Mill Parkway and Whites Road/HT Access 1
Condition Measure EB (Fort Mill Parkway) WB (Fort Mill Parkway) NB (Whites Road) SB (HT Access 1) Intersection
2025 Existing B (11.1) A (3.6) E (63.1) -
2029 Background C (26.4) B (11.3) D (37.7) D (52.5)
2029 Build-out C (27.5) B (17.2) D (38.8) E (58.1)
2029 Build-out IMP C (27.9) B (18.2) C (33.1) D (52.2)
2025 Existing B (10.3) A (6.6) E (68.9) -
2029 Background C (26.7) B (14.4) E (56.6) E (78.6)
2029 Build-out C (28.0) B (15.2) E (56.6) F (80.8)
2029 Build-out IMP C (30.1) B (15.7) D (54.4) E (79.8)
Background Storage
Exceeds storage
# 95th percentile volume exceeds capacity, queue may be longer
m Volume for 95th percentile queue is metered by upstream signal
41
Holbrook Commercial Development
Transportation Impact Analysis Update
28
6. 2 FORT MILL PARKWAY AND S DOBYS BRIDGE ROAD/ HT
ACCESS 2
Table 6.2 summarizes the LOS, control delay (seconds), and 95th percentile queue lengths at the
signalized intersection of Fort Mill Parkway and S Dobys Bridge Road/HT Access 2.
Table 6.2 – Fort Mill Parkway and S Dobys Bridge Road/HT Access 2
As shown in Table 6.2, the overall intersection is projected to operate at LOS D during the AM peak
hour and LOS E during the PM peak hour under future year conditions analyzed. Given the addition
of site traffic is not projected to significantly increase delays during the peak hours, no
improvements are recommended for capacity purposes.
It is noted that based on review of the existing conditions, an overlap phase for the eastbound right-
turn is currently in operation. This overlap phase was modeled in all scenarios.
Based on review of the Synchro 95 th percentile queues, the westbound and southbound left -turn
lanes are projected to exceed the available storage during the PM peak hour under background
and build-out conditions. Since the storage lengths are exceeded under both background and build-
out conditions and the proposed site is not expected to significantly increase the queue lengths,
the turn lane is not recommended to be extended as developer responsibility.
EBL EBT EBR WBL WBTR NBL NBT NBR SBL SBTR LOS (Delay)
AM Peak Hour
LOS (Delay) D (51.0)
Synchro 95th Q - 774' 103' 213' 539' #1067' 172' - 15' -
LOS (Delay) D (43.6)
Synchro 95th Q m17' #857' 374' m#197' m660' #490' 101' 276' 72' 112'
LOS (Delay) D (45.5)
Synchro 95th Q m15' #970' 6' m#210' m#736' #490' 97' 312' 69' 108'
PM Peak Hour
LOS (Delay) D (50.2)
Synchro 95th Q - 573' 55' 454' 367' #756' 0' - 0' -
LOS (Delay) E (56.3)
Synchro 95th Q m9' #1084' 716' m#525' m652' #455' 156' 112' 129' 202'
LOS (Delay) E (58.7)
Synchro 95th Q m8' #1157' 717' m#537' m691' #455' 156' 141' 129' 202'
150' 350' 750' 250' 100'Background Storage
Exceeds storage
# 95th percentile volume exceeds capacity, queue may be longer
m Volume for 95th percentile queue is metered by upstream signal
2029 Background C (29.3) E (67.3) E (77.7) E (67.2)
2029 Build-out C (33.8) E (69.5) E (77.6) E (67.2)
2025 Existing B (17.5) D (53.5) F (95.5) A (1.1)
2029 Background C (21.9) D (42.4) E (63.9) D (47.8)
2029 Build-out C (21.3) D (49.9) E (64.5) D (45.1)
2025 Existing C (22.6) D (43.7) F (83.2) F (109.5)
Table 6.2 - Fort Mill Parkway and S Dodys Bridge Road/HT Access 2
Condition Measure EB (Fort Mill Parkway) WB (Fort Mill Parkway) NB (S Dobys Bridge Road) SB (HT Access 2) Intersection
42
Holbrook Commercial Development
Transportation Impact Analysis Update
29
6. 3 FORT MILL P AR KW AY AND HOLBROOK R OA D/N DOBYS
BRI DGE R OA D
Table 6.3 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
signalized intersection of Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road .
Table 6.3 – Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
As shown in T able 6.3, the overall intersection is projected to operate at LOS C in the AM peak
hour and LOS D in the PM peak hour under background conditions. With the addition of site traffic,
the intersection is projected to degrade to LOS D during the AM peak hour. Given the overall
intersection LOS degradation during the AM peak hour and degradation from E to F and D to E on
the northbound approach, the following improvement was identified:
• Construct a northbound right-turn lane along Holbrook Road
With this improvement in place, the degradations are resolved. Based on Synchro 95 th percentile
queues, the SCDOT minimum 100 feet of storage is recommended.
Based on review of the Synchro 95 th percentile queues, the southbound and eastbound left-turn
queues are projected to exceed the available storage during the PM peak hour under background
and build-out improved conditions. Since the storage lengths are exceeded under both background
and build-out improved conditions, the turn lane is not recommended to be extended as developer
responsibility.
It is noted that the northbound left -turn lane is projected to exceed storage in build-out improved
conditions. Additionally, based on review of SimTraffic queues for build-out improved conditions,
the queu e along the northbound approach (caused by northbound left -turn demand at the
intersection) was shown to extend beyond the Holbrook Road/Public Storage Driveway/Access 1
intersection, therefore causing extensive queueing along Access 1. To improve the queue on the
northbound approach, the following alternative build improvements were identified:
• Construct a northbound right-turn lane along Holbrook Road
• Construct an eastbound right-turn lane along Fort Mill Parkway
EBL EBT EBR WBL WBTR NBL NBT NBR SBL SBT SBR LOS (Delay)
AM Peak Hour
LOS (Delay) C (21.9)
Synchro 95th Q 83' 38' 353' 345' 19' 67' 81'
LOS (Delay) C (26.8)
Synchro 95th Q m214' 39' 503' 254' 117' 59' 164'
LOS (Delay) D (37.1)
Synchro 95th Q m262' 43' 519' #380' 146' 73' 164'
LOS (Delay) C (34.2)
Synchro 95th Q m270' 45' 487' #339' 103' 0' 146' 74' 158'
LOS (Delay) C (33.1)
Synchro 95th Q m#334' m#1049' m11' 53' 532' 299' 94' 0' 146' 74' 173'
PM Peak Hour
LOS (Delay) C (24.4)
Synchro 95th Q 43' 35' 560' 231' 30' 131' 386'
LOS (Delay) D (41.2)
Synchro 95th Q m371' 50' #1078' 203' 183' 128' 425'
LOS (Delay) D (44.4)
Synchro 95th Q m363' 50' #1051' 274' #217' 138' 418'
LOS (Delay) D (44.0)
Synchro 95th Q m367' 52' #1078' 269' 84' 32' 204' 137' 467'
LOS (Delay) D (41.7)
Synchro 95th Q m362' m352' m5' 53' #1064' 267' 83' 31' 203' 136' 468'
350' 325' 250' 150' 525'
m417'
#433'
#1157'
m#1180'
156'
m368'
m393'
103'
148'
Exceeds storage
# 95th percentile volume exceeds capacity, queue may be longer
m Volume for 95th percentile queue is metered by upstream signal
Background Storage
2029 Build-out IMP
(Alternative)
C (28.9) D (46.5) D (51.8)
2029 Build-out C (32.7) D (47.7) E (59.3) D (55.0)
2029 Build-out IMP C (33.3) D (48.1) D (52.4) D (54.8)
D (53.1)
2029 Background C (30.7) D (45.6) D (44.6) D (53.7)
98'
141'
2029 Build-out IMP
(Alternative)
C (29.7) D (35.3) D (41.1) C (33.0)
2029 Build-out IMP C (27.3) C (28.0) E (65.4) C (32.0)
2029 Background B (15.0) C (25.8) E (69.9) C (29.5)
2029 Build-out C (24.5) C (29.1) F (89.7) C (32.8)
A (6.1) B (14.3) F (102.2) B (14.6)
162'219'
151'
Table 6.3 - Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
Condition Measure EB (Fort Mill Parkway) WB (Fort Mill Parkway) NB (Holbrook Road) SB (N Dobys Bridge Road) Intersection
2025 Existing
D (54.8)
2025 Existing A (4.3) B (13.6) F (83.9)
43
Holbrook Commercial Development
Transportation Impact Analysis Update
30
With these improvements in place, the overall intersection is projected to continue operating at LOS
C during the AM peak hour and LOS D during the PM peak hour . Based on review of the Synchro
95th percentile queues, the SCDOT minimum 100 feet of storage is recommended for both the
northbound and eastbound right-turn lanes.
It is noted that with these improvements in place, the
northbound left -turn queue is projected to exceed
available storage by less than two car lengths during the
peak hours.
As shown in the image to the right, the northbound left -
turn lane and taper area are currently maximized to the
existing Public Storage Driveway, and additional storage
is available within the taper area . Additionally, a
northbound left -turn lane is available for the Public
Storage Driveway. Therefore, Do Not Block striping and
signing is recommended on Holbrook Road in the Public
Storage Driveway/Access 1 area.
It is noted that the additional lane (eastbound right) in the
alternative scenario also resolves the SimTraffic queueing on Access 1 projected in the build -
improved scenario; therefore, the alternative mitigation is recommended.
44
Holbrook Commercial Development
Transportation Impact Analysis Update
31
6.4 FORT MILL PARKWAY AND HAIRE ROAD
Table 6.4 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
unsignalized intersection of Fort Mill Parkway and Haire Road.
Table 6.4 – Fort Mill Parkway and Haire Road
Table 6.4 shows that the stop -controlled northbound and southbound approaches of Haire Road
are expected to operate with moderate delays during the AM peak hour, and moderate-long delays
during the PM peak hour under background conditions.
When the proposed site traffic is added to the 2029 background conditions, the stop -controlled
northbound and southbound approaches are projected to operate with long delays during both peak
hours. Given the projected degradation in LOS and associated long delays , identification of
mitigation improvements is required. The following improvement is recommended to mitigate the
impact of the proposed site:
• Construction of a southbound right-turn lane along Haire Road
• Construction of a westbound left-turn lane along Fort Mill Parkway
With these improvements in place, the southbound approach is projected to operate with moderate
delays during both peak hours, while the northbound approach is projected to continue to operate
with long delays during both peak hours . Given the low volumes on the northbound approach at
this intersection the addition of a turn lane is not recommended. An additional scenario, considering
the interconnectivity between Haire Road and Holbrook Road provided by the site, was also
considered. This scenario considers the redistribution of northbound left-turning and through traffic
from Haire Road (6 vehicles in the AM peak and 1 vehicle in the PM peak) to Holbrook Road, where
access to a traffic signal is provided under the assumption that northbound left-turn movements
from Haire Road can utilize Access 3. It is noted that this an isolated scenario for this intersection
given the minimal volumes being redistributed.
EBLTR WBL WBTR NBLTR SBLT SBR
AM Peak Hour
LOS (Delay)
Synchro 95th Q 3' 5'
LOS (Delay)
Synchro 95th Q 3' 0'
LOS (Delay)
Synchro 95th Q 3' 13'
LOS (Delay)
Synchro 95th Q 3' 18' 0' 13' 28' 8'
LOS (Delay)
Synchro 95th Q 3' 18' 0' 0' 25' 3'
PM Peak Hour
LOS (Delay)
Synchro 95th Q 0' 3'
LOS (Delay)
Synchro 95th Q 3' 3'
LOS (Delay)
Synchro 95th Q 3' 5'
LOS (Delay)
Synchro 95th Q 3' 13' 0' 5' 25' 8'
LOS (Delay)
Synchro 95th Q 3' 13' 0' 0' 25' 8'
A (1.2) C (22.1) E (40.9)2029 Build-out IMP
(Redistribution)
F (121.8)
A (0.2)
A (0.3)2029 Build-out IMP
2025 Existing
2029 Build-out IMP
(Redistribution)
A (0.3) A (2.3) C (15.5)
Table 6.4 - Fort Mill Parkway and Haire Road
IntersectionNB (Haire Road)
E (44.3)
F (70.1) E (47.0)
A (0.2)
2029 Background
Condition SB (Haire Road)
A (0.4) D (26.7) C (20.2)
2029 Build-out
Measure EB (Fort Mill Parkway)
A (0.4) D (34.5)
A (0.3) F (76.6)
2025 Existing
A (0.2)
D (25.1)
F (56.8)
2029 Background
A (0.2)
2029 Build-out IMP
2029 Build-out
F (69.5)
F (129.9) F (55.6)
A (0.2) E (45.6) C (23.3)
A (2.3)
A (0.1)
A (0.1)
18'
5'
0'
WB (Fort Mill Parkway)
A (2.3)
38'
18'
10'
A (1.2)
13'
A (1.2)
0'
A (0.0)
0'
A (0.0)
E (40.9)
45'
28'
18'
D (32.3)
45
Holbrook Commercial Development
Transportation Impact Analysis Update
32
Based on review of the SimTraffic maximum queues , the southbound right-turn lane is
recommended to be constructed with 75 feet of storage , and the westbound left -turn lane is
recommended to be constructed with the SCDOT minimum 150 feet of storage .
It is noted that the recommended southbound right -turn lane along Haire Road was also an
identified mitigation for the Williams Reserve development. However, this improvement was not
assumed part of background conditions given that Williams Reserve was not included in this TIA
due to Council denial at the time of scoping . Therefore, cost-sharing of the southbound right -turn
lane improvement should be considered as applicable.
46
Holbrook Commercial Development
Transportation Impact Analysis Update
33
6. 5 FORT MILL P ARKWAY AND WILLIAMS ROAD
Table 6.5 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
signalized intersection of Fort Mill Parkway and Williams Road.
Table 6.5 – Fort Mill Parkway and Williams Road
Table 6.5 shows that the signalized intersection is projected to operate at LOS B and C during the
AM and PM peak hours, respectively, under 2029 background conditions.
When the proposed site traffic is added to the 2029 background conditions, the overall intersection
is projected to operate at LOS C during both peak hours, with westbound approach delay increasing
by more than 25% during the AM peak hour. Additionally, the northbound approach is projected to
degrade LOS during the AM peak hour. Given the projected LOS degradations and delay
increases, the following improvement was identified:
• Construction of a westbound right-turn lane along Williams Road
With this improvement in place, the overall intersection is expected to operate at LOS B in the AM
peak hour and LOS C in the PM peak hour. Based on Synchro 95th percentile queues, the SCDOT
minimum 100 feet of storage is recommended for the right-turn lane.
It is noted that the recommended westbound right-turn lane along Williams Road was also an
identified mitigation for the Williams Reserve development. However, this improvement was not
assumed part of background conditions given that Williams Reserve was not included in this TIA
due to Council denial at the time of scoping. Therefore, cost -sharing of the westbound right-turn
lane improvement should be considered as applicable.
EBLTR WBLT WBR NBL NBTR SBL SBTR LOS (Delay)
AM Peak Hour
LOS (Delay) B (11.0)
Synchro 95th Q 42' 3' 188' 6' 77'
LOS (Delay) B (17.4)
Synchro 95th Q 66' 4' #376' 8' 137'
LOS (Delay) C (20.8)
Synchro 95th Q 68' 3' #526' 9' 174'
LOS (Delay) B (19.3)
Synchro 95th Q 84' #184' 6' 4' #489' 9' 190'
PM Peak Hour
LOS (Delay) B (11.6)
Synchro 95th Q 50' 2' 221' 10' 161'
LOS (Delay) C (20.4)
Synchro 95th Q 62' 2' #480' 14' 268'
LOS (Delay) C (22.8)
Synchro 95th Q 66' 2' #558' 15' 328'
LOS (Delay) C (21.7)
Synchro 95th Q 66' #166' 6' 2' #558' 16' 328'
275' 350'
Table 6.5 - Fort Mill Parkway and Williams Road
Condition Measure EB (Williams Road) WB (Williams Road) NB (Fort Mill Parkway) SB (Fort Mill Parkway) Intersection
2025 Existing B (15.6) B (19.7) B (10.5) A (6.9)
#90'
2029 Background B (17.7) D (35.2) B (17.9) A (8.6)
2029 Build-out B (19.6) D (46.8) C (22.3) A (9.1)
2029 Build-out IMP C (23.7) D (37.1) C (20.9)
2025 Existing B (16.7) C (22.0) B (10.9) A (8.9)
2029 Background C (21.2) D (43.3) C (21.4) B (12.6)
2029 Build-out C (23.0) D (49.6) C (24.4)
Background Storage
# 95th percentile volume exceeds capacity, queue may be longer
2029 Build-out IMP C (23.4) D (42.7) C (23.6) B (13.7)
#159'
#182'
#185'
#165'
#101'
A (9.2)
B (14.0)
47
Holbrook Commercial Development
Transportation Impact Analysis Update
34
6. 6 WILLIAMS R OAD AND N DOBYS BRIDGE ROAD
Table 6.6 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
unsignalized intersection of Williams Road and N Dobys Bridge Road.
Table 6.6 – Williams Road and N Dobys Bridge Road
Table 6.6 shows that the stop-controlled westbound approach is projected to operate with short
delays under all conditions analyzed. Therefore, no improvements are recommended for capacity
purposes.
WBLR NBTL SBLT
AM Peak Hour
LOS (Delay)
Synchro 95th Q 8' 0' 3'
LOS (Delay)
Synchro 95th Q 15' 0' 5'
LOS (Delay)
Synchro 95th Q 15' 0' 5'
PM Peak Hour
LOS (Delay)
Synchro 95th Q 15' 0' 3'
LOS (Delay)
Synchro 95th Q 30' 0' 5'
LOS (Delay)
Synchro 95th Q 30' 0' 5'
2029 Background C (20.1) A (0.0) A (0.8)
2029 Build-out C (21.1) A (0.0) A (0.7)
2025 Existing B (13.4) A (0.0) A (0.9)
2029 Background C (16.3) A (0.0) A (0.8)
2029 Build-out C (17.2) A (0.0) A (0.8)
2025 Existing B (12.8) A (0.0) A (1.0)
Table 6.6 - N Dobys Bridge Road and Williams Road
Condition Measure WB (Williams Road) NB (N Dobys Bridge Road) SB (N Dobys Bridge Road)Intersection
48
Holbrook Commercial Development
Transportation Impact Analysis Update
35
6. 7 HOLBROOK ROAD AND PUBLIC STORAGE DRIVEWAY/
ACCESS 1
Table 6.7 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
unsignalized intersection of Holbrook Road and Public Storage Driveway/Access 1.
Table 6.7 – Holbrook Road and Public Storage Driveway/Existing Driveway (Access 1)
Table 6.7 shows that the stop-controlled approaches operate with short delays under all conditions
analyzed. Therefore, no improvements are recommended for capacity purposes beyond the
construction of Access 1 with a single ingress and egress lane, as well as a stop sign and stop bar.
It is noted that per SCDOT, construction of a southbound left-turn lane along Holbrook Road is
required to maintain full-movement access at this location. This lane is shown in the site plan and
therefore modeled in build conditions. Based on review of SimTraffic maximum queues, this lane
is recommended to be constructed with the SCDOT minimum 150 feet of storage and appropriate
taper.
Based on the SCDOT ARMS Manual, the minimum throat length for unsignalized intersections with
one exit lane is 30 feet. Based on review of the Synchro 95 th percentile queues, SimTraffic
maximum queues, and SCDOT ARMS Manual minimums, a 70-foot internal protected stem (IPS)
is recommended along Access 1.
It is noted the southbound left -turn lane storage length and Access 1 IPS length are based on
SimTraffic max queues reported for the Fort Mill Parkway/Holbrook Road/N Dobys Bridge
intersection build-improved alternative scenario. This scenario is not represented in Table 6.7 since
those improvements are not necessary for Synchro capacity purposes at this intersection.
WB (Access 1)
EBLTR WBLTR NBLTR SBL SBTR
AM Peak Hour
LOS (Delay) -
Synchro 95th Q 10' - 0' 0' 0'
LOS (Delay) -
Synchro 95th Q 13' - 0' 0' 0'
LOS (Delay) B (10.9)
Synchro 95th Q 23' 15' 0' 3' 0'
PM Peak Hour
LOS (Delay) -
Synchro 95th Q 15' - 0' 0' 0'
LOS (Delay) -
Synchro 95th Q 20' - 0' 0' 0'
LOS (Delay) A (9.9)
Synchro 95th Q 30' 10' 0' 3' 0'
A (0.5) A (0.0)
Table 6.7 - Holbrook Road and Public Storage Driveway/Access 1
Condition Measure EB (Public Storage Driveway) NB (Holbrook Road) SB (Holbrook Road)Intersection
2025 Existing B (11.0)
2029 Background B (11.7) A (0.5) A (0.0)
2029 Build-out C (16.9) A (0.5) A (1.4)
2025 Existing B (11.0) A (0.7) A (0.0)
2029 Background B (11.9) A (0.6) A (0.0)
2029 Build-out C (15.2) A (0.6) A (0.7)
49
Holbrook Commercial Development
Transportation Impact Analysis Update
36
6. 8 FORT MILL PARKWAY AND N DOBYS COMMERCIAL ACCESS
2/ACCESS 2
Table 6.8 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
unsignalized intersection of Fort Mill Parkway and N Dobys Commercial Access 2/Access 2.
Table 6.8 – Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
As noted in Section 4.1, the N Dobys Commercial Development plans to construct its site access
as the southbound approach with Fort Mill Parkway. As shown in Table 6.8, under 2029 background
conditions, with the addition of this leg and associated background improvements along with
background traffic, the southbound approach is expected to operate with short and moderate
delays during the AM and PM peak hours, respectively.
It is noted that t he site plan includes an
eastbound right -turn lane and a
northbound right -turn acceleration lane,
as shown in the image. These
improvements have been incorporated
into the build conditions. Per the Manual
on Uniform Traffic Control Devices
(MUTCD), Section 2B.10.03, the
northbound right-turn lane would operate
as a yield control. With these
improvements, the northbound approach is projected to operate with short delays, while the stop -
controlled southbound approach is projected to continue operating with short to moderate delays.
Based on the SCDOT ARMS Manual, the minimum throat length for unsignalized intersections with
one exit lane is 30 feet. Based on review of the Synchro 95 th percentile queues, SimTraffic
maximum queues, and SCDOT minimum, a 30-foot IPS is recommended along Access 2.
EBL EBTR WBLT WBR NBR SBLR
AM Peak Hour
LOS (Delay)
Synchro 95th Q 3' 0' 0' 0' - 20'
LOS (Delay)
Synchro 95th Q 3' 0' 0' 0' 25' 28'
PM Peak Hour
LOS (Delay)
Synchro 95th Q 2' 0' 0' 0' - 30'
LOS (Delay)
Synchro 95th Q 3' 0' 0' 0' 18' 35'
2029 Background A (0.4) A (0.0) - D (26.9)
2029 Build-out A (0.4) C (15.4) D (32.3)A (0.0)
2029 Background A (0.4) A (0.0) - C (19.2)
2029 Build-out A (0.4) B (14.9) C (23.7)A (0.0)
Table 6.8 - Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
Condition Measure EB (Fort Mill Parkway) NB (Access 2) SB (N Dobys Commercial Access 2)IntersectionWB (Fort Mill Parkway)
50
Holbrook Commercial Development
Transportation Impact Analysis Update
37
6. 9 HAIRE ROAD AND ACCESS 3
Table 6.9 summarizes the LOS, control delay (seconds), and 95 th percentile queue lengths at the
proposed ingress-only intersection of Haire Road and Access 3.
Table 6.9 – Haire Road and Access 3
Based on the projected results, no improvements are recommended for capacity purposes beyond
the construction of Access 3 with a single ingress lane.
EB (Access 3)
EB NBLT SBTR
AM Peak Hour
LOS (Delay) -
Synchro 95th Q - 0' 0'
PM Peak Hour
LOS (Delay) -
Synchro 95th Q - 0' 0'
2029 Build-out A (0.0) A (0.0)
2029 Build-out A (0.0) A (0.0)
Table 6.9 - Haire Road and Access 3
Condition Measure NB (Haire Road) SB (Haire Road)Intersection
51
Holbrook Commercial Development
Transportation Impact Analysis Update
38
7.0 Auxiliary Turn-Lane Warrants
Warrants for additional turn -lane improvements for unsignalized intersections beyond those
necessary for capacity were determined based on a review of the figures 9.5-A through 9.5-G found
on pages 9.5 -2 through 9.5 -9 in the 2021 SCDOT Roadway Design Manual . SCDOT turn-lane
warrant graphs are included in the Appendix.
The following turn lanes are warranted under 2029 build-out conditions:
Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
• Eastbound right-turn lane (AM peak hour)
This turn lane was modeled under build conditions as it’s identified on the current site plan.
Fort Mill Parkway and Haire Road
• Westbound left-turn lane (both peak hours)
This turn lane was identified for capacity purposes as well.
While not warranted, a southbound left-turn lane along Holbrook Road at Access 1 is being required
by SCDOT as a condition for full movement access.
52
Holbrook Commercial Development
Transportation Impact Analysis Update
39
8.0 Pedestrian and Bicycle Operations Analysis
In addition to vehicular capacity analyses, the Town of Fort Mill also requires non -vehicular
operations analyses, including pedestrian and bicycle analyses, to allow for the safe and
convenient travel for all modes.
Pedestrian Operations Analysis
The Highway Capacity Manual 6th Edition was used to evaluate the pedestrian LOS at the study
intersections. The HCM provides methodology for calculating the pedestrian LOS for TWSC
intersections and signalized intersections based on geometric data, demand data , and signal
control data including, but not limited to:
⚫ Number of lanes on the major street
⚫ Crossing distance
⚫ Traffic volumes
⚫ Motorist yielding rates to pedestrians
⚫ Cycle length
⚫ Walk time
⚫ Presence of pedestrian phase
It should be noted that pedestrian delay and LOS calculation methodology for TWSC intersections
in the HCM only applies to the major street, free -flow crossings. It is stated in the HCM that
“approaches where conflicting traffic is stop-controlled are assumed to result in negligible delay for
pedestrians, as vehicles are required to stop and wait for conflicting vehicle and pedestrian traffic
before proceeding.”
Table 8.0 lists pedestrian LOS thresholds published in the HCM. The pedestrian LOS calculation
worksheets are included in the Appendix.
Table 8.0 – Pedestrian LOS Thresholds
LOS Average Control Delay
(seconds per pedestrian) LOS Score
A 0 – 5 1.50
B 5 – 10 > 1.50 – 2.50
C 10 – 20 > 2.50 – 3.50
D 20 – 30 > 3.50 – 4.50
E 30 – 45 > 4.50 – 5.50
F > 45 > 5.50
Table 8.1 summarizes the LOS and control delay (seconds per pedestrian) for the unsignalized
intersections, and the LOS and LOS score for the signalized study area intersections. The LOS
and delay are reported for pedestrians crossing the free -flow approaches only at the TWSC
intersection, and the LOS and LOS score are reported for all approaches at the signalized
intersections.
53
Holbrook Commercial Development
Transportation Impact Analysis Update
40
Table 8.1 – Pedestrian Operations
As shown in Table 8.1, the study area intersections are expected to operate at LOS D or better
during both peak hours under 2029 build -out/improved conditions, with the exception of the
following unsignalized intersections:
⚫ Fort Mill Parkway and Haire Road
⚫ N Dobys Bridge Road and Williams Road
⚫ Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
These delays are primarily attributed to long crossing distances, relatively high vehicular travel
speeds (Fort Mill Parkway 45 mph posted), and/or high traffic volumes along Fort Mill Parkway and
N Dobys Bridge Road during the peak hours. It is noted that identified developer improvements for
the intersection of Fort Mill Parkway and Haire Road are projected to improve pedestrian LOS
crossing the eastbound approach given the median area that pedestrians may use to cross this
leg. It is also noted that the site is not projected to significantly increase delays beyond background
conditions at the intersection of N Dobys Bridge Road and Williams Road.
The following pedestrian and bicycle accommodations are recommended by the development:
⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage
and in the development’s roadway improvement areas (Fort Mill Parkway and along
Holbrook Road within 500 feet), and five -foot-wide sidewalks along the site’s frontage
otherwise.
⚫ Installation of crosswalks/markings and pedestrian ramps/truncated dome mats across the
site accesses as appropriate.
Condition Peak EB WB NB SB Condition Peak EB WB NB SB
5 - Fort Mill Parkway and Williams Road
AM C (2.83) C (2.91) B (2.31) - AM B (1.77) B (1.84) B (2.42) B (2.38)
PM C (2.91) C (2.95) B (2.26) - PM B (1.79) B (1.88) C (2.58) C (2.53)
AM C (3.00) C (3.07) B (2.42) B (2.22) AM B (1.81) B (1.89) C (2.63) C (2.55)
PM C (3.07) C (3.11) B (2.39) B (2.24) PM B (1.81) B (1.95) C (2.81) C (2.72)
AM C (3.02) C (3.10) B (2.43) B (2.22) AM B (1.81) B (1.91) C (2.75) C (2.66)
PM C (3.08) C (3.13) B (2.40) B (2.24) PM B (1.81) B (1.96) C (2.88) C (2.79)
2 - Fort Mill Parkway & S Dobys Bridge Road/HT Access 2 AM B (1.82) B (2.08) C (2.75) C (2.66)
AM C (2.95) C (2.78) C (2.69) B (1.76) PM B (1.81) B (2.10) C (2.88) C (2.79)
PM C (3.00) C (2.89) C (2.79) B (1.76) 6 - N Dobys Bridge Road & Williams Road
AM C (3.07) C (2.96) C (2.93) B (2.05) AM - - F F
PM C (3.11) C (3.12) C (3.04) B (2.10) PM - - F F
AM C (3.10) C (3.01) C (2.94) B (2.05) AM - - F F
PM C (3.13) C (3.16) C (3.04) B (2.10) PM - - F F
3 - Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road AM - - F F
AM C (2.87) C (2.52) B (2.16) B (2.36) PM - - F F
PM C (3.01) C (2.67) B (2.17) B (2.40) 7 - Holbrook Road and Public Storage Driveway/Access 1
AM C (3.06) C (2.64) B (2.17) B (2.41) AM - - B (9.6) A (1.7)
PM C (3.26) C (2.85) B (2.20) B (2.48) PM - - C (10.0) A (1.8)
AM C (3.14) C (2.68) B (2.24) B (2.44) AM - - C (12.2) A (2.1)
PM C (3.30) C (2.86) B (2.24) B (2.50) PM - - C (13.2) A (2.2)
AM C (3.14) C (2.68) B (2.36) B (2.44) AM - - D (20.4) A (3.0)
PM C (3.30) C (2.86) B (2.36) B (2.50) PM - - C (19.1) A (4.0)
AM C (3.03) C (2.68) B (2.36) B (2.44) 8 - Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
PM C (3.16) C (2.86) B (2.36) B (2.50) AM - - - -
4 - Fort Mill Parkway and Haire Road PM - - - -
AM F F - - AM D (25.2) C (18.1) - -
PM F F - - PM E (32.6) E (32.6) - -
AM F F - - 9 - Haire Road and Access 3
PM F F - - AM - - A (0.2) A (0.4)
AM F F - - PM - - A (0.1) A (0.1)
PM F F - -
AM C (13.7) F - -
PM C (16.9) F - -
2029 Build-out
2029 Build-out
2029 Build-out IMP
2029 Build-out
2025 Existing
2029 Build-out
2029 Build-out IMP
2029 Background
Table 8.1 - Pedestrian Operations
1 - Fort Mill Parkway & Whites Road/HT Access 1
2025 Existing
2025 Existing
2029 Build-out
2029 Build-out
2029 Build-out
2029 Background
2029 Background
2029 Build-out
2029 Background
2025 Existing
2025 Existing
2025 Existing
2029 Background
2029 Background
2029 Background
2029 Build-out2029 Build-out IMP
2029 Build-out
(Alternative) 2029 Background
2025 Existing
54
Holbrook Commercial Development
Transportation Impact Analysis Update
41
It is noted that the current LOS methodology does not consider improvements made along the
roadway or site frontage. Therefore, the multi-use paths and sidewalk improvements do not show
improved pedestrian LOS in Table 8. 1. These improvements would be expected to improve
pedestrian and bicycle connectivity within the study area, however.
55
Holbrook Commercial Development
Transportation Impact Analysis Update
42
Bicycle Operations Analysis
The HCM does not provide methodology to analyze the operations of bicyclists at unsignalized
intersections. As listed in the approved TIA Scoping Document , the Charlotte Department of
Transportations’ (CDOT) Bicycle LOS Worksheet was used to determine the bicycle LOS. The
CDOT Bicycle LOS Worksheet assesses bicyclists’ comfort based on geometric and traffic signal
features including, but not limited to:
⚫ Number of lanes crossed
⚫ Presence of conflicting turning movements
⚫ Presence of bike lanes
⚫ Left-turn phase treatment (permitted green, protected green, leading green)
Intersection features are assigned points, as identified by CDOT in the worksheet. LOS for each
approach is calculated based on the accumulation of points for each geometric and traffic signal
feature identified in the worksheet. A higher number of points correlates to a better LOS. The LOS
thresholds for CDOT’s Bicycle LOS Worksheet are shown in Table 8.2.
Table 8.2
Bicycle LOS Thresholds
Level-of-Service Points
A 93+
B 74 – 92
C 55 – 73
D 37 – 54
E 19 – 36
F 0 – 18
CDOT’s Bicycle LOS Worksheet was originally developed to assess the operations of bicycles at
signalized intersections. Based on review of the inputs related to traffic signals, the worksheet was
used to evaluate bicycle LOS at the unsignalized intersections in this study using the following
assumptions to better reflect unsignalized operations:
⚫ Opposing vehicle left-turns were permitted (made on Green Ball only)
⚫ Right turn on red was permitted
Table 8.3 summarizes the LOS for bicyclists at the study area intersections. CDOT’s Bicycle LOS
Worksheet does not consider demand volumes; therefore, the bicycle LOS does not adjust or differ
between AM and PM peak hours, nor does it differ for future-year scenarios unless the intersection
laneage is modified. The bicycle LOS calculation worksheets are included in the Appendix.
56
Holbrook Commercial Development
Transportation Impact Analysis Update
43
Table 8.3 – Bicycle Operations
Table 8.3 shows that the study area intersections are expected to operate with an overall bicycle
LOS E or better under build-out/improved conditions with the exception of the Fort Mill Parkway
intersections with N Dobys Bridge Road/Holbrook Road and Williams Road, which are expected to
operate at LOS F under all conditions studied . This is primarily attributed to left- and right-turn
conflicts, speed limits, and lack of bicycle facilities.
The following pedestrian and bicycle accommodations are recommended to be constructed along
the site’s frontages and along the development’s roadway improvement areas:
⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage
and in the development’s roadway improvement areas (Fort Mill Parkway and along
Holbrook Road within 500 feet), and five -foot-wide sidewalks along the site’s fronta ge
otherwise.
⚫ Installation of crosswalks/markings and pedestrian ramps/truncated dome mats across the
site accesses as appropriate.
It is noted that the current LOS methodology does not consider improvements outside of the
roadway pavement area. Therefore, the shared use path improvements do not show improved
bicycle LOS in Table 8.3 . These improvements would be expected to improve pedestrian and
bicycle connectivity within the study area, however.
Condition Condition EB WB NB SB Intersection
Existing F(10) D- (40) D (45) - E (32)
Background & Build-out F (10) F (10) E (25) D (45) E- (23)
Existing F (15) E- (20) F (15) E+ (35) E- (21)
Background & Build-out F (15) F (5) F (5) C (60) E- (21)
Existing & Background F (10) F (5) F (5) E (30) F (13)
Build-out IMP F (5) F (5) F (5) E (30) F (11)
Build-out IMP (ALT) F (5) F (5) F (5) E (25) F (10)
Existing, Background, &
Build-out F (5) F (5) D (50) D (50) E (28)
Build-out IMP F (5) F (5) D (50) D (50) E (28)
Existing, Background, &
Build-out E (30) E (30) F (5) F (5) F (18)
Build-out IMP E (30) E (30) F (5) F (5) F (18)
6 - N Dobys Bridge Road and Williams Road Existing, Background, &
Build-out E (30) C (65) - D (50) D (48)
Existing, Background,
Build-out B (85) - D- (40) F (5) D (43)
Build-out D (50) D (50) F (5) F (5) E+ (35)
Existing & Background D- (40) F (5) - B (85) D (43)
Build-out F (5) F (5) D (50) D (50) E (28)
9 - Haire Road and Access 3 Build-out B (85) - D- (40) F (5) D (43)
7 - Holbrook Road and Public Storage
Driveway/Access 1
3 - Fort Mill Parkway and Holbrook Road/N
Dobys Bridge Road
Table 8.3 - Bicycle Operations
1 - Fort Mill Parkway and Whites Road/Access 1
2 - Fort Mill Parkway and S Dobys Bridge
Road/HT Access 2
4 - Fort Mill Parkway and Haire Road
5 - Fort Mill Parkway & Williams Road
8 - Fort Mill Parkway and N Dobys Commercial
Access 2/Access 2
57
Holbrook Commercial Development
Transportation Impact Analysis Update
44
9.0 Traffic Signal Warrants
Full traffic signal warrants were not analyzed as part of this TIA.
10.0 Compliance with Adopted Transportation Plans
This TIA has been prepared in compliance with plans, programs, and policies adopted by the Town
of Fort Mill and SCDOT.
58
Holbrook Commercial Development
Transportation Impact Analysis Update
46
11.0 Mitigation Improvements
Based on the vehicular, pedestrian , and bicycle operations analyses performed at each of the
identified study intersections, along with review of SCDOT turn-lane warrants contained herein, the
following improvements are identified to mitigate the impact of the proposed development on the
surrounding transportation infrastructure:
Fort Mill Parkway and Holbrook Road/N Dobys Bridge Road
⚫ Construct a northbound right -turn lane along Holbrook Road with 100 feet of storage and
appropriate taper.
⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage
and appropriate taper.
Fort Mill Parkway and Haire Road
⚫ Construct a southbound right -turn lane on Haire Road with 75 feet of storage and
appropriate taper. Cost sharing with other area projects should be considered as applicable
for this improvement.
⚫ Construct a westbound left-lane with 150 feet of storage and appropriate taper.
Fort Mill Parkway and Williams Road
⚫ Construct a westbound right-turn lane with 100 feet of storage and appropriate taper. Cost
sharing with other area projects should be considered as applicable for this improvement.
Holbrook Road and Access 1
⚫ Construct Access 1 to include a single ingress lane, single egress lane, stop control, and
a 70-foot internal protected stem (IPS).
⚫ Per SCDOT, construction of a southbound left -turn lane along Holbrook Road is required.
This lane is recommended to be constructed with 150 feet of storage and appropriate taper.
⚫ Install Do Not Block Intersection signage/striping along the northbound approach of
Holbrook Road.
Fort Mill Parkway and N Dobys Commercial Access 2/Access 2
⚫ Construct Access 2 to include a single right-in ingress lane, a single right-out egress lane,
and a 30 -foot IPS . Per coordination with SCDOT, an acceleration lane along Fort Mill
Parkway would be involved, with presumed yield control.
⚫ Construct an eastbound right -turn lane along Fort Mill Parkway with 100 feet of storage
and appropriate taper.
Haire Road and Access 3
⚫ Construct Access 3 to include a single ingress lane.
Study Area Pedestrian and Bicycle Improvements
⚫ Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway frontage
and in the development’s roadway improvement areas along Fort Mill Parkway and
Holbrook Road (within 500 feet), and five -foot-wide sidewalks along the site’s fronta ge
otherwise.
⚫ Install crosswalks/markings and pedestrian ramps/truncated dome mats across the site
accesses as appropriate.
The mitigation improvements identified within the study area are shown in Figure 1 1.1. The
improvements shown on this figure are subject to approval by SCDOT, Town of Fort Mill, and York
59
Holbrook Commercial Development
Transportation Impact Analysis Update
47
County as applicable. All additions and attachments to the public roadway system shall be properly
permitted, designed and constructed in conformance to standards maintained by the agencies.
It is noted that the site-civil engineer is responsible for confirming that the proposed access point s
meet current sight distance standards.
60
Figure 11.1Holbrook Commercial Development
Transportation Impact Analysis Update Identified Mitigation Improvements
NOT TO
SCALE
Williams Road
N Dobys Bridge Road
Whites Road
S Dobys Bridge Road
Holbrook Road
Public Storage
Driveway
Haire Road
LEGEND
Existing Lane
Storage Length
Stop Control
Traffic Signal
X'
Fort Mill Parkway
225'
425'300'
525'
350'
250'
350'
325'
150'
525'
275'
350'
Harris Teeter Center
Access 2
Harris Teeter Center
Access 1
Access 3
Access 2 N Dobys Comm.
Access 2
Access 1
150'
100'
100'
100'
150'
Maximize
Study Area Pedestrian and Bicycle Improvements
- Incorporate a minimum eight-foot multi-use path along the site’s Fort Mill Parkway
frontage and in the development’s roadway improvement areas along Fort Mill
Parkway and Holbrook Road (within 500 feet), and five-foot-wide sidewalks along the
site’s frontage otherwise.
- Install crosswalks/markings and pedestrian ramps/truncated dome mats across the
site accesses as appropriate.
Background Improvements
Recommended Improvements
Internal Protected StemIPS
SITE
100'
50'
100'
100'
75'
100'
150'
150'
Recommended Cost Sharing
Install "Do Not
Block Intersection"
signage/striping
70' IPS
30' IPS
100'
61
62
63
64
65
66
67
68
69
STATE OF SOUTH CAROLINA ) ORDINANCE NO. 2026-___
COUNTY OF YORK )
TOWN OF FORT MILL )
AN ORDINANCE AN
NEXING YORK COUNTY TAX MAP PARCELS 738-00-00-
063, 738-00-00-097, 738-00-00-004, AND A PORTION OF 738-00-00-062, LOCATED AT THE
INTERSECTION OF FORT MILL PARKWAY AND HOLBROOK ROAD CONTAINING
APPROXIMATELY 8.254 +/- ACRES
WHE
REAS, a proper petition was submitted to the Fort Mill Town Council on April 20,
2026, by Ashok Patel (the “Property Owner”), requesting that York County Tax Map Parcels 661-
00-00-030 and 658-00-00-106, such parcels being owned fully by the Property Owner, be annexed
to and included within the corporate limits of the Town of Fort Mill under the provisions of S.C.
Code Section 5-3-150(3);
WHE
REAS, the proper petition submitted to the Fort Mill Town Council on April 20,
2026, also identified Ashok Patel as the authorized agent to represent Susan Haire Harnishfeger
and Dena Haire, owners of York County Tax Parcel Number 738-00-00- 004, as well as Charles
A. Wilson, owner of York County Tax Percel Number 738-00-00-062.
WHER
EAS, the Planning Commission of the Town of Fort Mill, in a duly called meeting
on October 26, 2026, made its recommendation in favor of annexation, and that upon annexation,
the aforesaid area shall be zoned under the Town’s Zoning Ordinance, as follows: HC Highway
Commercial;
WHE
REAS, a public hearing was advertised and held at 6:00 p.m. on September 15, 2026,
during a duly called regular meeting of the Town Council of the Town of Fort Mill;
WHE
REAS, Section 5-3-150(3) of the Code of Laws of the State of South Carolina, as
amended, provides that any area or property which is contiguous to a municipality may be annexed
to the municipality by filing with the municipal governing body a petition signed by all persons
owning real estate in the area requesting annexation. Upon the agreement of the governing body
to accept the petition and annex the area, and the enactment of an ordinance declaring the area
annexed to the municipality, the annexation is complete;
WHE
REAS, using the definition of “contiguous” as outlined in S.C. Code Section 5-3-
305, the Town Council has determined that the above -referenced property is contiguous to
property that was previously annexed into the corporate limits of the Town of Fort Mill; and
WHE
REAS, the Town Council has determined that annexation would be in the best
interest of both the Property Owner and the Town of Fort Mill.
NOW,
THEREFORE , pursuant to the authority granted by the Constitution and the
General Assembly of the State of South Carolina, BE IT ORDAINED by the Mayor and Town
Council of the Town of Fort Mill, South Carolina, in meeting duly assembled, as follows:
70
2
SECTION I. Annexation. It is hereby declared by the Town Council of the Town of Fort
Mill, in Council assembled, that the incorporated limits of the Town of Fort Mill shall be extended
so as to include, annex and make a part of said Town, the described area of territory above referred
to, being more or less 8.254 +/- acres, the same being fully described in Exhibit “A” and Exhibit
“B” attached hereto, and contiguous to land already within the Town of Fort Mill. Pursuant to
S.C. Code Section 5-3- 110, this annexation shall include the whole or any part of any street,
roadway, or highway abutting the above referenced property, not exceeding the width thereof,
provided such street, roadway or highway has been accepted for and is under permanent public
maintenance by the Town of Fort Mill, York County, or the South Carolina Department of
Transportation.
SEC
TION II. Zoning Classification of Annexed Property. The above-described property,
upon annexation into the corporate limits of the Town of Fort Mill, shall be zoned, as follows: HC
Highway Commercial.
SEC
TION III. Voting District. For the purpose of municipal elections, the above-described
property, upon annexation into the incorporated limits of the Town of Fort Mill, shall be assigned
to and made a part of Ward One (1).
SEC
TION IV. Notification. Notice of the annexation of the above-described area and the
inclusion thereof within the incorporated limits of the Town of Fort Mill shall forthwith be filed
with the Secretary of State of South Carolina (SCSOS), the South Carolina Department of Public
Safety (SCDPS), and the South Carolina Department of Transportation (SCDOT), pursuant to S.C.
Code § 5-3-90(E).
SECTI
ON V. Severability. If any section, subsection, or clause of this ordinance shall be
deemed to be unconstitutional or otherwise invalid, the validity of the remaining sections,
subsections, and clauses shall not be affected thereby.
SEC
TION VI. Effective Date. This ordinance shall be effective from and after the date of
adoption.
FIRST READING: October 26, 2026, Approved, Held Public Hearing
SECOND READING: _______________
SIGNED:
Mayor Guynn H. Savage Cary B. Vargo, Town Manager
Enac
ted this ________ day of ________________, 2026, by a majority vote of the duly
elected Town Council of the Town of Fort Mill.
ATTE
ST:___________________________
Casey O’Brien, Municipal Clerk
71
3
EXHIBIT A
Prope
rty Description
All
those certain pieces, parcels or tracts of land lying, being and situate in Fort Mill Township,
County of York, State of South Carolina, containing 8.254 +/- acres, more or less, containing all
the property shown in the map attached as Exhibit B, and being more particularly describe d as
York County Tax Map Parcels 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of
738-00-00-062 located at the intersection of Fort Mill Parkway and Holbrook Road Sutton Road.
Purs
uant to S.C. Code Section 5-3-110, this annexation shall include the whole or any part of any
street, roadway, or highway abutting the above referenced property, not exceeding the width
thereof, provided such street, roadway or highway has been accepted for and is under permanent
public maintenance by the Town of Fort Mill, York County, or the South Carolina Department of
Transportation.
72
18882898v2 03957.02087 4
EXH
IBIT B
Prope
rty Maps
73
18882898v2 03957.02087 5
Tax Pa
rcels Parcels 738-00-00-063, 738-00-00-097, 738-00-00-004, and a portion of 738-00-00-062– An
Annexation Exhibit Showing Property Along Fort Mill Southern Bypass (At Intersection With N Dobys Bridge
RD & Holbrook Rd) prepared by Thomas E. White, dated 7-28-26, attached hereto
74