Historic Review Board
205 N. White Street
July 14, 2026
4:30 p.m.
Agenda
CALL TO ORDER
APPROVAL O
F MINUTES
1. HRB Meeting: June 9, 2026 [pages 2 - 6 ]
OLD BUSINESS
1. Request for Modifications to a previous Certificate of Appropriateness [pages 7 - 39 ]
Applicant Name: Growing Main, LLC
Owner Name: Kevin Higgins
Property Address: 233 Main Street
Purpose: Modifications to a previous Certificate of Appropriateness
Property Information: Local Commercial (LC) and Historic Overlay District
NEW BUSINESS
2. Request for Certificate of Appropriateness [pages 40 - 62 ]
Applicant Name: Barron B. Mack, Jr.
Owner Name: Mack Family Trust, LLC
Property Address: 124 Confederate Street
Purpose: Certificate of Appropriateness for exterior remodeling
Property Information: Local Commercial (LC) and Historic Overlay District
INFORMATIO
N AND DISCUSSION
• August 20,
2026 virtual continuing education opportunity (6:00 pm – 7:30 pm)
ADJOURN
The following press was notified of the meeting by email or fax in accordance with the Freedom of Information Act:
The Herald, CN2, WRHI, WSOC, and WBTV. The agenda was also posted at the entrance to Town Hall the
required length of time and on the Town website. The Town of Fort Mill is committed to assuring accessibility with
reasonable accommodation, of Town services and facilities for all individuals, in compliance with federal law.
contact the Town Manager’s Office at 803-547-2116 if you need assistance.
1
TOWN OF FORT MILL
HISTORIC REVIEW BOARD MEETING
June 9, 2026
205 N. White St
4:30 p.m.
Pres
ent: Chairwoman Megan Brinton, Vice Chairman David Booth, Scott Couchenour,
Chuck Wright, Planning Director Penelope Karagounis, Deputy Planning Director
Joey Adams-Raczkowski, Planner Emily Hawkins.
Abse
nt: Joanne Walker, Elizabeth Leventis, and David Helms
Guests: See attached sign in sheet
Chai
rwoman Megan Brinton called the Historic Review Board meeting to order at 4:32 p.m. on
Tuesday, June 9, 2026.
APPRO
VAL OF MINUTES
Chai
rwoman Megan Brinton asked for a motion to be made to approve Historic Review Board meeting
minutes from May 12, 2026. Mr. Couchenour made the motion to approve the minutes as presented. Vice
Chairman Booth seconded the motion. The motion to approve the minutes from May 12, 2026, was
approved by a vote of 4:0.
NEW BUSINESS
1. Requ
est for Bailey Bill Preliminary Certification
Deput
y Planning Director Joey Adams-Raczkowski introduced the request for a Bailey Bill Preliminary
Certification for the historic Williamson Mill site located at 104 Williamson Street. The application is
submitted by Jerry Gronske - 104 Williamson, LLC.
Mr. A
dams-Raczkowski reminded the board that the Town of Fort Mill Code of Ordinances authorizes a
Special Tax Assessment for Rehabilitated Historic Properties that meet the criteria for eligibility This is
authorized by Section 5 -21-140 of the SC Code of Laws and is generally referred to as the Baile y Bill.
Upon final certification, the Bailey Bill allows the property’s value to be assessed at the pre-rehabilitation
value for a period of 20 years.
For t
his submittal, the applicant has provided an application and a copy of an assessment from York County
Tax Assessor, both of which are on file with the Planning Department. The FMV via the appraised value
published by the York County Tax Assessor, is $2,010,200. Thus, the minimum expenditure required for
this project is $402,040, or 20% of the appraised value. The application indicates that the anticipated project
cost of $74M greatly exceeds the minimum, mandatory expenditure amount. The project mus t also meet
2
the work and rehabilitation standards which have already been reviewed by the HRB and subsequent
Certificates of Appropriateness were issued by the HRB on January 13, 2026, and March 10, 2026.
Duri
ng discussion, Mr. Adams -Raczkowski clarified that the Bailey Bill only applied to the historic
Williamson Mill site. The new construction of multi-family and commercial, along with the parking deck,
are not eligible for the Bailey Bill.
Wit
h no more discussion, Chairwoman Bri nton called for a motion. Mr. Couchenour made a motion to
approve the request as submitted. Mr. Wright seconded the motion. The motion passed unanimously 4:0.
2. Requ
est for Certificate of Appropriateness – 214 Main Street
Deput
y Planning Director Adams-Raczkowski introduced the request for a Certificate of Appropriateness
at 214 Main Street to address signage issues due to this being a multi-tenant building with two distinct and
separate entrances. The building at 214 Main Street is a three -tenant space. However, only Suite 101
occupied by NeedleWorx directly fronts on Main Street and was previously approved for a projecting wall
sign.
Mr. A
dams-Raczkowski explained that the other two suites , entered via a separate entrance at the rear of
the building, are occupied by Phoebes and Veritas Construction. These businesses are ineligible for
independent signage on the façade of 214 Main Street because the entrance is at the rear of the building.
Therefore, the tenants are requesting a muti-tenant directional sign to be placed on the left of the entrance
to NeedleWorx, which will list all three tenants. The second part of the request is to consider approving a
shared projecting wall sign for Phoebes and Veritas Construction, which would be located to the left of the
rear building entrance.
Duri
ng the board discussion, staff and the applicant clarified that the signs would be wrapped in a vinyl
product and/or have metal sign inserts for utilization by future business es who may occupy these three
suites. Mr. Adams-Raczkowski also clarified for the board that they do have the ability to provide input
about the signage colors and bracketing or mounting method that will be used.
Wit
h no more discussion, Chairwoman Brinton called for a motion. Commissioner Wright made a motion
to approve the request as submitted. Mr. Couchenour seconded the motion. The motion passed
unanimously 4:0
3. Requ
est for Certificate of Appropriateness Modification – 232 Main Street
Mr. A
dams-Raczkowski stated that the HRB issued a COA on January 14, 2025, for the rear of the
Kimbrell’s building for remodeling and conversion of the exterior loading dock area. The project would
remove portions of the loading dock, install a new roofing system, and upgrade exterior stairs and entrances
to three suites in the rear of the building. Upon a recent site inspection, staff discovered that a majority of
3
the work had been completed. However, the new brick columns are about 70” taller, and all the bricking
unde
rneath the new roofing system had been painted. Neither of those project elements were previously
appr
oved by the HRB. Additionally, not all previously approved replacement windows have been
replaced.
Property owner Kevin Higgins explained that Treadstone occupies one of the lower suites and The Mill
24hr Fitness occupies both a lower and the entire upper suite. Mr. Higgins explained that he arranged for
the tenants to upfit the interior and exterior areas of their portions of the building. Mr. Higgins stated that
all of the windows will be replaced, however, some may have to be slightly moved due to the
building official’s comments. Mr. Higgins also explained that he was aware that there was difficulty
attempting to remove layers of tar from the old roofline and some of the bricking began to degrade after
pressure washing it 3 times. Mr. Higgins recalls talking with the contractor about painting the brick
instead
as the best option, which he admits was a terrible mistake. As for the brick columns, Mr.
Higgins said that they had the extra brick and thought the taller bricking on the columns looks better.
During board discussion, Chairwoman Brinton emphasized that the brick was not approved to be painted
and none of the board members know the details of what the brick looked like before it was painted, so it
is
difficult for the board to decide without that information. Board member Wright made the point tha t
there are processes through which brick can be restored and is concerned about setting a precedent of
allowing brick to be painted without more information.
There was additional discussion among the board members about how to proceed with motions . Staff
explained that
this was one request and although separating the columns from the paint is an option,
one motion could be made with conditions. Board member Couchenour made a motion to approve
the column height as-is. With no second, the board entered additional discussion about the
application, including deferral of the item so that the applicant can present more information to the HRB.
Options were
presented to the applicant regarding actions the board could take. If the item is deferred, the
applicant can bring back additional details from the contractor and architect to HRB regarding why the
brick was painted. With this option, the tenants could not occupy the spaces. If the columns are approved
and the paint will be removed, the tenants could move forward with occupancy once they pass inspection.
The applicant indicated that he needed time to bring more information back to the HRB for consideration.
W
ith no more discussion, Board member Wright made a motion to defer so the applicant can bring back
details regarding any window changes along with a formal request for the column height and
justification for painting the brick. Board member Couchenour seconded the motion. The motion passed
unanimously 4:0.
Mr. Adams-Raczkowski clarified for the applicant that the next deadline to have all materials turned in
for the July 14, 2026, meeting is
June 23rd.
4
4. Request for Certificate of Appropriateness Modification – 112 Confederate Street
Mr. Adams-Raczkowski stated that the HRB issued a COA for this project on May 13, 2025, for exterior
remodeling. Upon a recent site visit staff noticed that the materials for the canopy entries, placement of
some of the paint colors, and materials for the railings were different than what was originally approved.
Also, although exterior to the building and approved separately, the additional parking was not installed.
Mr. Adams-Raczkowski clarified that the additional parking was not necessary to meet minimum parking
standards.
Architect Ver onica Grant and Attorney David Buist represented David Martin Law firm. Mr. Buist
acknowledged that there was a discrepancy between the colored renderings that were included in the HRB
packet versus the architectural renderings that were part of the building permit package. Mr. Buist
confirmed that those two items should have been coordinated more closely at the time of building permit
submission. Ms. Grant reviewed the architectural elevations with the board and described the changes as
well as the justification for the changes. The wooden materials for the canopies and the railings were
replaced with metal materials due to fire retardancy requirements. The same paint colors were used as
originally approved, however, applied to different parts of the structure.
The board members discussed the changes with Ms. Grant and Mr. Buist.
With no further discussion, Chairwoman Brinton asked for a motion. Vice Chairman Booth made a motion
to approve the changes as presented . Board member Wright seconded the motion. The motion passed
unanimously 4:0.
INFORMATION / DISCUSSION
Planning staff reminded the board members of their continuing education requirements for the upcoming
period and that staff would be communicating opportunities for the board to earn those educational
credits.
ADJOURNMENT
Chairwoman Brinton entertained a motion to adjourn the meeting. Vice Chairman Booth made a motion
to adjourn. Mr. Couchenour seconded the motion. The motion to adjourn was approved by a vote of 4-0.
The meeting adjourned at 5:44 PM
Respectfully submitted by Joey Adams-Raczkowski
Deputy Planning Director
June 18, 2026
5
6
INFORMATION/MATERIALS FROM APPLICANT FOR JULY 14, 2026, MEETING [pages 7 - 20]
STAFF REPORT & ATTACHMENTS FROM JUNE 9, 2026, MEETING [pages
21 - 39]
OLD BUSINESS
Request for Modifications to a previous Certificate of Appropriateness
Applicant Name: Growing Main, LLC
Owner Name
: Kevin Higgins
Property Address: 233 Main Street
Purpose: Modifications to a previous Certificate of
Appropriateness
Property Information: Local Commercial (LC) an
d Historic Overlay District
7
June 12, 2026
Kevin Higgins
Growing Main, LLC sent via email: kevinh@aquatreegarden.com
232 Main Street
Fort Mill, SC 29715
RE: 232 Main Street
Certificate of Appropriateness – Action to Defer
Zoning Case 2026-278
Dear Mr. Higgins,
On Tuesday, June 9, 2026, the Town of Fort Mill Historic Review Board (HRB) met to consider
modifications to a previously approved Certificate of Appropriateness (COA) issued on January 14, 2025,
submitted by Growing Main, LLC at 232 Main Street.
During deliberations, the board members reached the consensus that you have not provided enough
information for the board to make an informed decision regarding the primary issue of the existing brick
being painted without prior approval from the HRB. The board members requested that you provide
greater details as to how and why the decision to paint the brick was made; pictures and descriptions of
the condition of the brick prior to painting; the cost of restoring the brick prior to painting; and the cost of
restoring the brick to an unpainted state. The board also specifically asked that the contractor(s) and
architect provide opinions as to the issues mentioned above.
The HRB voted unanimously 4:0 to defer this request to the July 14, 2026, meeting. You were informed
by staff at the meeting that the deadline for submitting information for inclusion in the agenda packet is
June 23, 2026. You were also instructed that no Certificates of Occupancy would be issued for the tenant
spaces until these issues are resolved.
Please send all information to my attention via email jadamsraczkowski@fortmillsc.gov. If you have any
questions, please contact me via email or by calling 803-835-1162.
Take care,
Joey Adams-Raczkowski, AICP
Deputy Planning Director
8
232 Main Street – Rear Exterior
Brick Condition Documentation & Supporting Materials
Prepared in support of the Certificate of Appropriateness Modification request to the Fort Mill Historic
Review Board.
Contents of This Document
This packet documents the condition of the rear brick wall at 232 Main Street before, during, and after the
recent renovation, and includes contractor pricing obtained for alternative approaches to addressing the
painted brick. It is organized as follows:
1. Before: Original Loading Dock Condition
Photographs of the rear loading dock area prior to renovation.
2. During: Construction and Brick Condition Discovered
Photographs taken during construction, including two close-up, annotated views highlighting brick discoloration
and mortar inconsistency discovered once the old roofing and tar buildup were removed.
3. After: Completed Renovation
Photograph of the same area following completion of the work.
4. Contractor Bids: Alternative Repair Approaches
Pricing obtained from two contractors for alternative approaches to the brick: (a) chemical/pressure-wash removal
of existing coating, and (b) full demolition and relay of the painted brick veneer. Both bids are included as exhibits.
9
1. Before: Original Loading Dock Condition
The following photographs show the rear loading dock area prior to renovation, including the original brick,
short columns, corrugated metal awning, and concrete loading ramp.
Photo 1 – Rear loading dock, original condition (wide view)
Photo 2 – Original brick, columns, and awning structure (close view)
10
2. During: Construction and Brick Condition Discovered
The following photographs were taken during construction, documenting site conditions as the old roofing
and tar buildup were removed and the brick beneath was prepared and pressure washed. Two close-up
views below highlight areas where the brick and mortar showed visible discoloration and inconsistency
once exposed.
Photo 3 – Construction site overview, secured perimeter
Photo 4 – Foundation and structural work in progress
11
Photo 5 – Exposed brick wall section prior to brick work completion
Photo 6 – Rear stair wall, brick condition visible after site work
12
Close-Up: Brick Discoloration and Mortar Inconsistency
The circled areas below highlight discoloration and surface degradation observed on the brick wall
beneath the new stair landing, consistent with the deterioration described following repeated pressure
washing.
Photo 7 – Streaking and surface degradation on lower brick wall (detail)
13
Photo 8 – Discolored brick patch near stair wall, inconsistent with surrounding brick (detail)
14
3. After: Completed Renovation
The following photograph shows the same rear area following completion of the work, including the
painted brick, raised column height, new metal roof structure, and new stairs and decking serving the
upper and lower suites.
Photo 9 – Rear entrance area, completed renovation
15
4. Contractor Bids: Alternative Repair Approaches
To evaluate alternatives to the painted brick, pricing was obtained from two contractors for approaches
that would remove the paint and restore or replace the brick. Both bids are attached as exhibits
immediately following this page.
Exhibit A: Paint/Coating Removal
Best Under Pressure, Inc. provided a bid of $6,735.00 to chemically strip and pressure wash the existing
paint/coating from the brick, including a multi-coat stripper process, prep, clean-up, and boom lift rental.
This approach does not address any underlying brick or mortar damage; it would only remove the surface
coating.
Exhibit B: Demolition and Relay of Brick Veneer
Griffin Masonry, Inc. provided a bid of $73,075.00 to demolish and relay approximately 2,500 square feet
of painted brick veneer. Notably, this bid’s qualifications state that brick and mortar color/texture would be
matched to the existing wall “as close as possible,” but that an exact match is not guaranteed
— the
same matching risk that contributed to the original decision to paint the brick.
16
Estimate
Date
6/15/2026
Bid#
6706
Estimate For:
CARMEL CONTRACTORS
114 SPRINGS ST. STE A
FORT MILL, SC 29715
BEST UNDER PRESSURE, INC.
704-363-7646 - FAX - 704-948-6274
ckay@carolina.rr.com
PO BOX 943
HUNTERSVILLE, NC 28070
Job Site
232 Main St Ft Mill
We look forward to working with you!
Total
Description Qty. Rate Total
232 Main St, Ft Mill
- 4 HRS PREP
4 100.00 400.00
- 28 HRS CHEM APPLICALTION & PRESSURE WASH 28 100.00 2,800.00
- 8 HRS CLEAN UP 8 100.00 800.00
- MATERIALS - 20-25 GALLONS STRIPPER, LCS BY ECO CHEM, 3
COAT PROCESS AT SOME AREAS IF NOT ALL ACCORDING TO TEST
RESULTS, PLASTIC AND TAPE
1 700.00 700.00
- BOOM LIFT RENTAL 1 WEEK 1 2,035.00 2,035.00
$6,735.00
17
PO Box 23027 P (704) 545-2722
Charlotte, NC F (704) 545-3063
Project Name: Treadstone
Project Address: Fort Mill SC
Client Name: Carmel Contractor
Estimator: Kory Podgaysky
Division 4
$73,075
Additional Item Pricing (Not included unless otherwise noted):
1) Water Wagon $250.00 each trip
2) Brick Field Sample Panel - (Sample panels built upon request at 7 courses tall x 3 brick wide = $350/each)
Qualifications:
1) This quote is based on field measured quantities
2) Brick to match existing as close as possible. Brick match is not guaranteed
3) Mortar to match existing as close as possible. Mortar match is not guaranteed
4) Lay down area to be provided by GC. Relocation of laydown area will be charged at $100/hr
for labor and equipment.
5) This bid is good for 30 days
6) Water to be provided by GC from on site source. Additional costs will be incurred if GMI is required
to bring water from offsite.
7) Back charges for corrective work or replacement of material will not be accepted unless
authorized by Griffin Masonry, Inc. before such costs are incurred.
Exclusions:
1) Bond premium
2) Layout of corners and lines
3) Anchor bolts
4) Bearing plates
5) Caulking and backer rod
6) Testing or special inspections
7) Steel, rebar, welded wire mesh
8) Mechanically fastened, welded, loose lintels (GMI to install loose lintels)
9) Welding
10) Sealants, coatings, paints, hardeners, densifiers, integral colored concrete, polishing, grinding
11) Wall brace footings & engineering
12) Demolition
13) E.I.F.S., GFRC, FRP, and stucco
14) Waterproofing
15) Fireproofing
Demo & relay painted brick
6/19/2026 1:41 PM 1 of 1
18
June 27, 2026
Penelope Karagounis MA
Planning Director
205 N White Street, Fort Mill, SC, 29715
RE: 232 Main Street – Certificate of Appropriateness Modification – Rear Brick Condition
Fort Mill Historic Review Board
To the Fort Mill Historical Board,
I am writing as the contractor responsible for the exterior renovation work at the rear of
232 Main Street to explain the circumstances that led to our decision to paint the brick in
the rear area of the canopy addition.
As part of removing the old roo fing system and the former loading dock ramp, we pressure
washed the rear brick wall to clear years of tar buildup and black mastic membrane
waterproo
fing from the original brick surfaces. We tried multiple times to remove this
material with no success. After repeated cleaning e fforts, it became clear that the existing
brick had deteriorated signi ficantly and repeated e fforts to clean the brick would
deteriorate the conditions further. Compounding this situation the mortar in the newer
brick and the newer brick itself did not match the older, original brick beside it. The result
was a wall surface that was both compromised in places and visually inconsistent.
In discussing options with the property owner, we elected to paint the brick to create a
uniform appearance across the rear of the building, so that the area would appear as an
architectural opening into the suites rather than a mismatched hodge podge of new and
old masonry. At the time, this seemed like a practical solution to a real problem with the
existing materials.
Looking back, our mistake was moving forward with the painting before bringing this to the
Historic Review Board and getting their input and approval first. That is on us, and we
understand the Board's concerns about precedent and about not having seen the brick's
condition firsthand before the work was done. We have provided photos to the owner
(Kevin Higgens) taken during the process and we will try our best to answer any questions
the Board has so they can fully evaluate the situation.
Respectfully,
Scott Tuttle
Carmel Contractors
NC License #54548 PO Box 588 • Fort Mill, SC 29716 SC License #G109706
704.552.2338 • carmelcontractors.com
19
131 EAST GREGG STREET
FORT MILL SC 29715
704 . 953 . 5014
SC 10143
A4 H
05/29/26 6
09/04/25 -
HRB
ELEVATIONS
DATE INFO REV
SET HISTORY
© 2025 COPYRIGHT . THIS DRAWING IS THE PROPERTY of
53:TWELVE PA . REPRODUCTION or REUSE IN PART or WHOLE
WITHOUT WRITTEN PERMISSION IS PROHIBITED.
THE MILL 24/7 GYM
232 MAIN STREET FORT MILL SC SUITE 120 / 220 / 230
12/09/25 CODE 1
05/29/26
03/09/26 CODE 2
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
EXISTING WINDOW :
PAINT DARK BRONZE
EXISTING WINDOW :
PAINT DARK BRONZE
MATCH LINEMATCH LINE
1011 10 9 8
T/FOOTING
-10'-6"
LOWER
-9'-6"
FIRST FLOOR
±0"
T/TRUSS
+11'-4"
T/WALL
+12'-8"
NEW GALVANIZED
STEEL ADA COMPLIANT
SINGLE RAIL HANDRAIL
EACH SIDE OF RAMP
AND STAIR
NEW MASONRY
CANOPY COLUMN
BASE : FACE BRICK =
MATCH EXISTING
POURED CONCRETE
CURB WALL
NEW STEEL CANOPY
FRAME : COLOR =
DARK BRONZE
/ STANDING SEAM
METAL ROOF PANELS :
COLOR DARK BRONZE
NEW GALVANIZED
STEEL GAURD RAIL :
COLOR = DARK
BRONZE
/ WITH WELDED WIRE
INFILL PANELS :
COLOR = BLACK
NEW ALUMINUM
STOREFRONT ENTRY
WITH SIDE LIGHT :
COLOR = ANODIZED
DARK BRONZE
NEW FACE BRICK
MASONRY WALL AT
FACE OF STAIR :
COLOR = MATCH
EXISTING
CONCRETE CAP
HOLLOW METAL DOOR
AND FRAME : COLOR =
DARK BRONZE
PREFINISHED METAL
GUTTER
GALV STEEL
DOWNSPOUT
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
PHASE 2 :
NEW ALUMINUM
STOREFRONT
WINDOW : COLOR =
ANODIZED DARK
BRONZE
EXISTING WINDOW :
PAINT DARK BRONZE
EXISTING WINDOW :
PAINT DARK BRONZE
MATCH LINEMATCH LINE
1/4" = 1'-0"
01 EAST ELEVATION
1/4" = 1'-0"
05 EAST ELEVATION
ALLEY PERSPECTIVE
20
HISTORIC REVIEW BOARD
Applicant: Growing Main, LLC
Subject Property: 232 Main Street
Property Owner: Growing Main, LLC
Tax Map # 020-03-01-008
Zoning District: Local Commercial, LC/Historic iŽôŘīÍƅϙDistrict
Zoning Case:ϙ 2026-278
R
EQUEST
Growing Main, LLC has applied to modify an existing Certificate of Appropriateness (COA) for 232 Main
Street, originally approved by HRB on January 14, 2025.
VICINITY MAP
21
DISCUSSION
This building is located within the downtown historic district. It is not listed on the National Register of
Historic Places (NRHP). It was constructed in circa 1956 and was once the Kimbrell’s Furniture Store.
Below is a picture of the front of the building from several years ago, when still in operation as a furniture
and appliance store.
22
DISCUSSION , CONTINUED
Below is a photograph of the existing building prior to renovations.
23
DISCUSSION , CONTINUED
The applicant states that the existing loading ramp will be removed. Below is an illustration of the existing
and elevation. Full sheets of the below are included as attachments to the COA application.
AREAS OF DEMOLITION
24
PROPOSED EXTERIOR WORK – JANUARY 2025
Below is a revised drawing illustrating the proposed exterior improvements to this building. It should be
noted that the applicant is also requesting that the exterior windows be approved in addition to the revised
canopy design.
25
26
27
EMAIL FROM CONTRACTOR EXPLAINING MODIFICATIONS – MAY 2026
28
AS CONSTRUCTED – May 2026
29
AS CONSTRUCTED – May 2026
30
AS CONSTRUCTED – May 2026
31
SECRETARY OF INTERIOR ’S STANDARDS
The Secretary of Interior’s Standards typically serve as the basis for determining the approval, approval
with modifications, or denial of certificate of appropriateness by the HRB. Please use the below standards
in evaluating the soundness of the COA application.
1. Every reasonable effort shall be made to provide a compatible use for a property which
requires minimal alteration of the building, structure, or site and its environment, or to use a
property for its original intended purpose.
2. The distinguishing original qualities or character of a building, structure, or site and its
environment shall not be destroyed. The removal or alteration of any historic material or
distinctive architectural features should be avoided when possible.
3. All buildings, structures, and sites shall be recognized as products of their own time.
Alterations that have no historical basis and which seek to create an earlier appearance shall
be discouraged.
4. Changes which have taken place in the course of time are evidence of the history development
of a building, structure, or site and its environment. These changes may have acquired
significance, and this significance shall be recognized and respected.
5. Distinctive stylistic features or examples of skilled craftsmanship which characterize a
building, structure or site shall be treated with sensitivity.
6. Deteriorated architectural features shall be repaired rather than replaced wherever possible.
In the event replacement is necessary, the new material should match the material being
replaced in composition, design, color, texture, and other visible qualities. Repair or
replacement of missing architectural features should be based on accurate duplications of
features, substantiated by history, physical, or pictorial evidence rather than on conjectural
designs or the availability of different architectural elements from other buildings.
7. The surface cleaning of structures shall be undertaken with the gentlest means possible.
Sandblasting and other cleaning methods that will damage the historic building material shall
not be undertaken.
8. Every reasonable effort should be made to protect and preserve archaeological resources
affected by, or adjacent to the property.
9. Contemporary design for alterations and additions to existing properties shall not be
discouraged when such alterations and additions do not destroy significant historical,
architectural, or cultural materials, and such design is compatible with the size, scale, color,
material, and character of the property, neighborhood, or environment.
10. Wherever possible, new additions or alterations to structures shall be done in such a manner
that if such additions or alterations were to be removed in the future, the essential form and
integrity of the structure would be unimpaired.
32
STAFF FINDINGS
Modifications presented:
1. Painting of existing brick
2. Phased approach to installing windows
3. Slight design changes
STAFF RECOMMENDATION
Staff welcomes additional discussion between the applicant and the HRB about this project and will
stand in support of the design which HRB ultimately chooses to approve.
ATTACHMENTS
1. Portion of previous COA application with written description of work.
2. HRB Minutes 1.14.2025 meeting
3. COA issued by HRB 1.14.2025
33
MINUTES
TOWN OF FORT MILL
HISTORIC REVIEW BOARD
January 14th, 2025
112 Confederate Street
4:30 PM
Present: Chairwoman Megan Brinton, Vice Chairman David Booth, Scott Couchenour, Hynek
Lettang, Elizabeth Leventis, Joanne Walker, Jessica Scarlett, Planning Director Penelope
Karagounis, Senior Planner Alex Moore, and Planner Grayson Molinari
Absent: N/A
Guests: Kevin Higgins, Jeffery Hunter, Lisa Zederbaum
CALL TO ORDER
Chairwoman Megan Brinton called the meeting to order at 4:31 PM.
NOMINATION OF CHAIRPERSON AND VICE CHAIRPERSON
Elizabeth Leventis nominated Megan Brinton for the roll of Chairwoman. Joanne Walker
seconded this motion, with a vote of 7-0 the motion was approved.
Scott Couchenour nominated David Booth for the roll of Vice Chairman. Ms. Leventis seconded
this motion, with a vote of 7-0 the motion was approved.
APPROV AL OF MINUTES
Mr. Couchenour made the motion to approve the minutes from the December 10th, 2024, HRB
meeting. David Booth seconded the motion with edits. Then, by a vote of 7-0, the minutes for
December 10
th, 2024, meeting was approved.
NEW BUSINESS
Request for Certificate of Appropriateness for 232 Main Street
Applicant and Property Owner, Growing Main LLC, requested for a Certificate of
Appropriateness following the deferred action of approval on December 10
th, 2024, for a canopy
roof. The previous design did not comply with the current historic district standards regarding
pitch, orientation, and complexity. The applicant, Kevin Higgins, presented a revised canopy
design with a flat roof which is appropriate within the historic district. Additional approvements
were presented like using galvanized steel guardrails and panels, entry doors, stairs, and new
windows. Staff recommended approval of the revised design, however, input of new additions
along with the revised roof was still needed by Historic Review Board members. Mr. Higgins and
his architect, Jeffery Hunter, brought materials that would be used for the new windows and door
outlines.
Mr. Higgins and Mr. Hunter approached the podium and showed the council members the
aluminum material they would use for the structure of windows and doors.
34
Ms. Walker motioned to accept the revised concept proposal. Hynek Lettang seconded this
motion. The motion to pass 232 Main Street for a Certificate of Appropriateness was approved by
a vote of 7-0.
Request for Certificate of Appropriateness for 106 Confederate Street
Mackey Realty requested a COA for a projecting signage and window signage at 106
Confederate Street. This building is located within the historic district and is registered on the
National Register. The proposal is approximately 3.32 square feet in area. The window and door
signage complies with minimum coverage area. Staff recommended approval. Representing
Mackey Reality was Lisa Zederbaum, Director of Sales, who approached the podium.
Ms. Zederbaum explained that the sign was the exact same size as the previous sign.
Ms. Leventis motioned to approve the signage and Jessica Scarlett seconded that motion. The
certification of approval was passed by a vote of 7-0.
There being no further business, Chairwoman Brinton adjourned the meeting at 5:02 PM.
Respectfully submitted,
Grayson Molinari
Planner
January 16
th, 2025
35
January 28th, 2025
Mr. Kevin Higgins
Growing Main, LLC
kevinh@aquatreegarden.com
RE: 232 Main Street
Certificate of Appropriateness
Zoning Case 2024-609
Mr. Higgins,
On Tuesday January 14
th, 2025, the Town of Fort Mill Historic Review Board (HRB) met to consider an
application for a Certificate of Appropriateness (COA) submitted by Growing Main, LLC for proposed
exterior improvements at 232 Main Street. The HRB rendered their approval for these exterior
improvements based on the attached drawings.
This approval by the HRB for this COA does not preclude the requirement for obtaining the necessary
zoning and/or building permit(s) from the Town of Fort Mill. The application for commercial review is
available at the following link: Town of Fort Mill Commercial Permit Application . You will submit the
commercial permit application to developmentcenter@fortmillsc.gov.
A Town of Fort Mill business license must be obtained for private contractors performing work on this
project. For questions about business licenses, please contact Maria Watts atmwatts@fortmillsc.gov or
(803) 835-1167. If you have any questions or comments about the contents of this letter, please contact
me at (803) 835-1162, or via email at amoore@fortmillsc.gov.
Sincerely,
Alex J. Moore, AICP
Senior Planner
Attachments
Ecc: jeff.hunter@53twelve.com
gmolinari@fortmillsc.gov
developmentcenter@fortmillsc.gov
36
37
38
39
HISTORIC REVIEW BOARD
Applicant: Barron B. Mack, Jr.
Subject Property: 124 Confederate Street
Property Owner: Mack Family Trust, LLC
Tax Map # 020-06-08-006
Zoning District: Local Commercial, LC/Historic Overlay District
Zoning Case: 2026-328
REQUEST
Mr. Mack has applied for a Certification of Appropriateness (COA) for 124 Confederate Street to
perform exterior renovations to the existing building.
VICINITY MAP
40
DISCUSSION
The application on file in the Planning Department indicates that the project will consist of renovation
of the existing building at 124 Confederate Street. As a former residential structure, the property was
converted into a commercial establishment. The intent is to renovate the building for continued
commercial use. Proposed exterior improvements include removal of the existing vinyl siding (yellow
in color), repair or replace and damaged wood siding, repair or replace trim, repair boards on the ADA
accessible ramp, and remove existing windows on the side porch with screens. The paint color for
siding and trim will be ‘Dove White. The screening will be a product called “Screen Tight.” Below are
current views of the elevations of the structure.
View from Confederate Street
41
Left side of structure as viewed from Confederate Street (top picture)
Rear of structure (bottom picture)
42
Rig
ht side of structure as viewed from Confederate Street (top picture)
Porch on right side of house – windows changing to screens
43
DISCUSSIO N, CONTINUED
A contributing property within a historic district is one which adds to the historic integrity or
architectural qualities that make the historic district significant.
In 1992, the National Register of Historic Places (NRHP) multiple property documentation form
for historic properties of Fort Mill, SC was prepared by Mary W. Edmonds of the South Carolina
Department of Archives & History. The associated historic contexts of the report prepared by
Ms. Edmonds were as follows:
• The Growth and Development of Fort Mill, circa 1779 to circa 1940.
• The Commercial and Institutional Development of Fort Mill, circa 1860 to circa 1940.
• The Residential Development of Fort Mill, circa 1869 to circa 1940.
In this report Ms. Edmonds states that NRHP registration requirements require that buildings to
be included as a commercial building property type should have a clear relationship to the
development of the commercial core of Fort Mill and that they should reflect the significance of
circa 1860 to circa 1940.
Thus, this structure was built after the period of significance reflected within our historic district
and is therefore considered non-contributing. Page 86 of the historic district guidelines indicate
that the “Design Guidelines for New Commercial, Mixed Use, and Multifamily Buildings” as
enumerated thereafter are to apply to new additions to contributing and non- contributing
buildings such as 124 Confederate Street.
Additionally, this section states that new commercial infill construction in areas outside of the
immediate Main Street context should be compatible with the district. While the proposed
remodeling of 124 Confederate Street involves a non-contributing building, and does not involve
new infill construction, there are certain aspects of compatibility which do apply:
• The applicant’s design does express the true age of the building rather than directly
imitating a historic style. This assists in the avoidance of confusing historic interpretation
of the context.
• The applicant has designed improvements with traditional colors which will allow the
building to be appropriately incorporated into the surrounding context. The proposed
color palette is similar to what is found along Confederate Avenue.
44
SECRETARY OF INTERIOR ’S STANDARDS
The Secretary of Interior’s Standards typically serves as the basis for determining the approval, approval
with modifications, or denial of certificate of appropriateness by the HRB. In this instance such points
as the building being “recognized as a product of its own time are relevant.” Please use the below
standards in evaluating the soundness of the COA application.
1. Every reasonable effort shall be made to provide a compatible use for a property which
requires minimal alteration of the building, structure, or site and its environment, or to use a
property for its original intended purpose.
2. The distinguishing original qualities or character of a building, structure, or site and its
environment shall not be destroyed. The removal or alteration of any historic material or
distinctive architectural features should be avoided when possible.
3. All buildings, structures, and sites shall be recognized as products of their own time.
Alterations that have no historical basis and which seek to create an earlier appearance shall
be discouraged.
4. Changes which have taken place in the course of time are evidence of the history
development of a building, structure, or site and its environment. These changes may have
acquired significance, and this significance shall be recognized and respected.
5. Distinctive stylistic features or examples of skilled craftsmanship which characterize a
building, structure or site shall be treated with sensitivity.
6. Deteriorated architectural features shall be repaired rather than replaced wherever possible.
In the event replacement is necessary, the new material should match the material being
replaced in composition, design, color, texture, and other visible qualiti es. Repair or
replacement of missing architectural features should be based on accurate duplications of
features, substantiated by history, physical, or pictorial evidence rather than on conjectural
designs or the availability of different architectural elements from other buildings.
7. The surface cleaning of structures shall be undertaken with the gentlest means possible.
Sandblasting and other cleaning methods that will damage the historic building material shall
not be undertaken.
8. Every reasonable effort should be made to protect and preserve archaeological resources
affected by, or adjacent to the property.
9. Contemporary design for alterations and additions to existing properties shall not be
discouraged when such alterations and additions do not destroy significant historical,
architectural, or cultural materials, and such design is compatible with the size, scale, color,
material, and character of the property, neighborhood, or environment.
10. Wherever possible, new additions or alterations to structures shall be done in such a manner
that if such additions or alterations were to be removed in the future, the essential form and
integrity of the structure would be unimpaired.
45
STAF
F FINDINGS
Planning staff finds that this application meets the standards as found within the historic district
guidelines as well as those put forth by the office of the Secretary of Interior.
STAFF RECOMMENDATION
Planning staff recommends that the HRB approve the application for the COA as submitted.
ATTACHMENTS
Attachments include the “Dove White” paint chip as well as a representation of the screening that will
be installed on the porch.
46
47
The Industry Leader in Porch
Screening Innovation
Our six screening systems, all with their unique features and
benefits, are the preferred choice of homeowners, designers
and building professionals.
EXPLORE SYSTEMS
MENU
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 1/24
48
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 2/24
49
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 3/24
50
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 6/24
51
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 7/24
52
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 9/24
53
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 10/24
54
MultiTrack
The most versatile screening system on the market. Achieve a clean lines and mounting on
the interior or surface of a porch structure. Spline optional! Multiple ways to mount,
multiple ways to screen.
NEW
LEARN MORE
Screen Wall
A modular screen porch framing system manufactured with Green Eagle T echnology
comprised of rigid PVC and composite fiber additiv es to withstand extreme wind and
weather.
LEARN MORE
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 11/24
55
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 12/24
56
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 13/24
57
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 15/24
58
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 16/24
59
MiniTrack
Ultra low profile aluminum tracks at just 3/4-inches to create wide open views. MiniT rack
mounts discretely on the interior center of existing porch framing to enable endless trim and
design options.
LEARN MORE
FastTrack
The versatile “Lego-like” aluminum framing system for intuitive installation, unlimited screen
porch panel configurations and expansive openings.
LEARN MORE
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 17/24
60
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 18/24
61
Questions?
Try out our AI assistant
7/1/26, 9:16 AM Screen Porch & Patio Systems from Screen Tight
https://www.screentight.com/screening-systems/ 19/24
62
Source: Town of Fort Mill website. First collected Oct 17, 2026.