Design Review Board — Agenda Packet
City of Spartanburg · Spartanburg County · Boards and Commissions · meeting of Sep 1, 2026 · Agenda packets
Open the original document More from City of Spartanburg
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068
email: planning@cityofspartanburg.org • website: www.cityofspartanburg.org
Agenda
Design Review Board (DRB)
September 1, 2026 at 5:30 PM
Dr. TK Gregg Community Center
650 Howard St. Spartanburg, SC 29303
I. Roll Call
II. Freedom of Information Act Compliance – Public notification of the
meeting has been published, posted, and mailed in compliance with the
Freedom of Information Act and requirements of the City of Spartanburg
Zoning Ordinance.
III. Rules and Procedures for Meeting Conduct
IV. Approval of Agenda
V. Disposition of Minutes of August 4, 2026 meeting
VI. Old Business: None
VII. New Business:
a. DRB-26-020-00003 — The Design Review Board (DRB) has received a
request for Full and Final Approval of the proposed development,
Carolina Foothills Credit Union Branch, located at 520 N Church St
(Tax Map Sheet: 7-12-01-179.00) with a zoning designation of D-T5
(Downtown Urban Center). Owner: Scott Weaver / Applicant: Joseph
Schwarz
VIII. Staff Announcements
IX. Adjournment
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068
email: planning@cityofspartanburg.org • website: www.cityofspartanburg.org
Meeting Minutes of the Design Review Board (DRB)
Tuesday, August 4, 2026, at 5:30pm
Dr. TK Gregg Recreation Center
Attendance
Board Members Present
• Jean Crowther, Vice Chair
• Danny Balon
• Brian Sanders
• Lukas Hauser (remote)
Staff Present
• Fredalyn Frasier, Planning Director
• Dominick Calace, Planner I
Others Present
• Joseph Schwarz, Applicant Representative
• Andrew Ackley, Seamon Whiteside
• Representatives of Carolina Foothills Federal Credit Union
• Members of the public
Call to Order
Vice Chair Crowther called the regular meeting of the Spartanburg Design Review Board to order at 5:30
p.m. A quorum was established, and public notice and meeting procedures were reviewed. Mr. Hauser
participated remotely.
Approval of Agenda
On a motion by Mr. Balon and seconded by Mr. Sanders, the agenda was approved unanimously
Approval of Meeting Minutes (July 7, 2026)
On a motion by Mr. Balon and seconded by Mr. Sanders, the minutes of the July 7, 2026, meeting were
approved unanimously.
Old Business:
No old business was presented.
New Business:
DRB-26-0200003 Carolina Foothills Credit Union Branch - Preliminary Conceptual Approval
The Board considered a request for Preliminary Conceptual Approval for a proposed Carolina Foothills
Credit Union branch at 520 North Church Street in the DT-5 zoning district. The request included two
exceptions: maintaining two driveway connections on the North Church Street primary frontage and
permitting a reduced sidewalk/streetscape condition along Parsonage Lane.
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068
email: planning@cityofspartanburg.org • website: www.cityofspartanburg.org
Prior to the presentation, Mr. Balon recused himself because Seamon Whiteside is involved with the
project.
Applicant Presentation
• Joseph Schwartz presented the proposed approximately 2,400-square-foot branch on a site that
Carolina Foothills has owned and operated for roughly 30 years. He explained that the former
branch was damaged by fire in late 2025, has since been demolished, and the site has been
graded and the former partial basement filled and compacted.
• The new building was described as a contemporary counterpart to another Carolina Foothills
branch completed in 2020. At approximately 23 feet in height, the building is intended to fit the
scale of nearby development along North Church Street.
• The site plan places the branch near the North Church Street/Parsonage Lane corner, with the
primary customer entrance oriented toward North Church Street. The main vehicular entrance
is from Parsonage Lane, while the applicant requested retention of two existing North Church
Street curb cuts as right-in/right-out access points to improve circulation and reduce congestion.
• A detached drive-through is proposed toward the rear of the property with two ITM lanes. One
lane is expected to operate initially, with infrastructure provided for a second machine if future
demand warrants.
• The applicant proposed a five-foot sidewalk along Parsonage Lane rather than the full DT-5
streetscape standard. The project team explained that the reduced width was intended to relate
to existing conditions and help preserve a large legacy tree near the Parsonage Lane/Magnolia
Street intersection.
• The building includes a tall curtain-wall/storefront system facing North Church Street. Exterior
materials include Chilton wedge stone, dark brick, precast stone banding, gray and orange metal
panels, clear glass, and spandrel glass. The orange metal panel extends over the primary
entrance to create a prominent canopy and shade element.
• Mechanical equipment would be located primarily at grade toward the rear of the building, with
no rooftop mechanical units proposed. The revised site also provides substantially more
pervious/landscaped area than the former development.
Public Comments
Vice Chair Crowther opened the public comment period. No members of the public spoke in favor of or
in opposition to the request. On a motion by Mr. Sanders and seconded by Mr. Hauser, the public
comment period was closed unanimously.
Board Deliberation and Staff Comments
• Mr. Sanders asked the applicant to explain the proposed sidewalk widths along Parsonage Lane
and the relationship to the DT-5 streetscape standard. The project team stated that updated
plans show a consistent five-foot sidewalk and acknowledged that portions could potentially be
widened toward the eight-foot standard.
• The project team explained that a full-width sidewalk and planting area near the Parsonage
Lane/Magnolia Street corner could conflict with a large existing legacy tree that the applicant
intends to preserve. The Board supported preserving the tree while maximizing pedestrian
space elsewhere along the frontage.
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068
email: planning@cityofspartanburg.org • website: www.cityofspartanburg.org
• Mr. Hauser emphasized the importance of treating Parsonage Lane as part of an increasingly
pedestrian-oriented downtown environment. He encouraged the applicant to widen the
sidewalk to the greatest extent feasible rather than simply matching an existing substandard
condition.
• Mr. Hauser also asked whether a walk-up ATM could be incorporated into the building for
pedestrians. The applicant explained that the current program relies on drive-through ITMs and
in-person teller/service functions, but agreed that a walk-up option could be explored with the
credit union.
• Mr. Hauser and Mr. Sanders expressed concern that the amount and placement of building
signage shown in the renderings could create unnecessary visual clutter, particularly where
multiple large signs would be visible simultaneously. Both complimented the building
architecture and encouraged a more restrained signage approach.
• Planning staff agreed with the Board's sidewalk comments and recommended working with the
applicant to obtain the widest feasible sidewalk along Parsonage Lane, recognizing that site
constraints may prevent the full standard in every location. Staff also noted that future
development should move toward the downtown streetscape standard rather than
perpetuating existing substandard sidewalk conditions.
• Staff agreed that the south-facing building signage appeared prominent and noted that signage
would undergo separate staff review for compliance with applicable requirements.
• Mr. Sanders supported retaining the two North Church Street access points as right-in/right-out
driveways based on the site's circulation needs. Andrew Ackley of SeamonWhiteside stated that
the project team had begun coordination with SCDOT and that preliminary feedback favored
right-in/right-out access over the existing full-access curb cuts because it would reduce turning
conflicts while distributing traffic among North Church Street, Parsonage Lane, and Magnolia
Street.
Motion
On a motion by Mr. Sanders and seconded by Mr. Hauser, the Design Review Board granted Preliminary
Conceptual Approval for the Carolina Foothills Credit Union project, including approval of the exception
for two driveways on the North Church Street primary frontage, with direction to:
• Widen the sidewalk along Parsonage Lane to the maximum extent feasible, working toward the
eight-foot standard where possible;
• Work with City staff to reduce visual clutter from building signage and comply with applicable
sign requirements; and
• Explore the incorporation of a walk-up ATM or similar pedestrian-oriented service option.
The motion passed unanimously among the participating Board members. Mr. Balon was recused from
the case.
Election of 2026-2027 Officers
• Mr. Sanders nominated Jean Crowther to serve as Chair. With no additional nominations, Ms.
Crowther was elected Chair unanimously.
Planning Department
PO Box 1749 • Spartanburg, SC 29304 • phone: (864) 596-2068
email: planning@cityofspartanburg.org • website: www.cityofspartanburg.org
• Mr. Sanders initially nominated Mr. Balon for Vice Chair, then withdrew that nomination and
nominated Lukas Hauser. Mr. Hauser accepted the nomination. With no additional nominations,
Mr. Hauser was elected Vice Chair unanimously.
Staff Announcements
• Staff advised the Board of a continuing education webinar addressing board deliberations,
findings, evidence, and creation of an adequate record. Staff explained that the webinar arose
from a Greenville County case and, although the legal context differs from the DRB's role, the
material would be useful in strengthening Board deliberations and decision-making. A
registration link will be provided to members.
Adjournment
On a motion by Mr. Balon and seconded by Mr. Sanders, the meeting was adjourned unanimously at
approximately 6:25 p.m.
____________________________
Jean Crowther, Chair
Planning Department
Design Review Board Meeting
09.01.2026
Carolina Foothills Federal Credit Union
520 N Church St
DRB Full and Final Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
DATE
August 25, 2026
PROJECT/ADDRESS/ TAX ID
Carolina Foothills Federal Credit Union /
520 N Church St / 7-12-01-179.00
TO
Design Review Board Members
PROJECT NUMBER
DRB- 26-02000003
REVIEW STATUS – Full and Final Review
COPIES TO
City Departments/Applicant
STAFF
Fredalyn M. Frasier, Planning Director
Dominick Calace, Planner I
GENERAL PROJECT OVERVIEW
Carolina Foothills Federal Credit Union proposes to redevelop its North Church Street branch following a
November 2025 fire that severely damaged the existing facility. The project includes construction of a new
approximately 23-foot-tall building with brick, stone, precast concrete, metal panels, glazing, landscaping, masonry
buffer walls, and an improved streetscape. The property is located within the D-T5 Downtown District and Side
Yard Parking Overlay.
PAST BOARD ACTION
The proposed project was presented on August 4, 2026 and received preliminary conceptual approval from the
Design Review Board. The following exception was granted at that time:
• 7.1.4 Parking Area Access: To permit two driveways on a primary frontage in the D-T5 zoning district.
For Full and Final Approval, the Board requested additional review by the applicant on the following items:
• 8.1 Required Streetscape: The Board requested revisions to the Parsonage Lane streetscape to provide a
more code-compliant design, including the widest sidewalk feasible. The D-T5 standards require an 8-foot
sidewalk with a 6-foot planting area or tree wells.
• Architectural and Design Refinements: The Board encouraged continued refinement of the following
elements:
• Explore an outdoor, walk-up ATM option that better supports an urban downtown environment.
• Continued coordination with Planning staff regarding signage requirements under Section 9 of the
Downtown Code.
AUTHORITY & APPLICABILITY
This parcel is zoned D-T5. The proposed project is a new construction development on the razed parcel formerly
occupied by a bank. In accordance with Section 2.2.3, all standards of the Downtown Code apply. Formal design
review and approval by the Design Review Board is required.
DETERMINATION OF COMPLETENESS
Application is complete.
Planning Department
Design Review Board Meeting
09.01.2026
Carolina Foothills Federal Credit Union
520 N Church St
DRB Full and Final Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
EXCEPTIONS REQUIRED
• 8.1 Required Streetscape: To permit an 8ft sidewalk and no planting area on Parsonage Lane
CODE REVIEW
Deficiencies noted, or exceptions or deviations required, are noted in blue italics
A. Use Standards: The proposed use is a Credit Union. This use is permitted by right.
B. District Standards:
• 3.3.1 Lot Configuration: Compliant
• 3.3.2 Primary Building Standards: Compliant
• 3.3.3 Accessory Building Standards: Not Applicable
• 3.3.4 Building Height: 2 stories minimum – proposed 23ft height – Compliant
• 3.3.5 Permitted Parking Location: Sideyard Parking Overlay – Compliant
• 3.3.6 Building Frontage: Shopfront and Awning – Compliant
C. General Standards:
• 4.3 Sideyard Parking Overlay: For D-T5 lots with frontage along certain streets without on-street
parking as noted on the Downtown Regulating Plan, the standards shall be as follows.
a. Frontage Build-Out Exemption: There shall be no required frontage build-out –
Compliant
b. Parking Location: Parking may be permitted in the side yard behind any required
screening however no parking may not be located at a corner – Compliant
D. Lot/Site Standards:
• 5.1.1 Lot Frontage: All lots must front on a street, square, or common open space – Compliant
• 5.1.2 Corner Lots: Buildings located at street intersections must place the main building, or part of
the building, at the corner – Compliant
• 5.1.3 Pedestrian Entries from Frontage Line: Compliant
• 5.1.4 Setbacks: Compliant
• 5.1.5 Adjacent Lots: Compliant
E. Utilities and Trash Containment:
• 5.2.1 Underground Utilities: Presumed Compliant – examined at site plan review
• 5.2.2 Solid Waste Storage Areas: Compliant
• 5.2.3 Mechanical and Utility Equipment: Ground level HVAC pad to be screened with plant
material from Parsonage Lane – Compliant
F. Building Standards:
• 6.1.1 General Design Principles - Connectivity: Compliant
• 6.1.2 General Design Principles - Housing: Compliant
• 6.1.3 General Design Principles – Mixed-Use Infill & Redevelopment: Compliant
• 6.1.4 General Design Principles - Downtown Should be Urban: Compliant
• 6.1.5 General Design Principles - Put People First: Compliant
Planning Department
Design Review Board Meeting
09.01.2026
Carolina Foothills Federal Credit Union
520 N Church St
DRB Full and Final Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
• 6.2 Required Building Design Standards:
o 6.2.1 Architectural Style: Compliant
o 6.2.2 Compatibility: Compliant
o 6.2.3 Proportions: Compliant
o 6.2.4 Wall Materials: Compliant
o 6.2.5 Façade Treatment: Compliant
o 6.2.6 Building Entrances: Not Applicable
• 6.4 Specific Building Design Standards: Mixed-Use and Commercial Buildings in D-T5 & D-T6
o 6.4.1 Roof and Eaves: Compliant
o 6.4.2 Canopies/Awnings: Compliant
o 6.4.3 Encroachments: Compliant
o 6.4.4 Ground Level Detailing:
a. Minimize Blank Walls: Compliant
b. Ground Level Glazing: Compliant
c. Transparency Zone: Compliant
o 6.4.5 Materials: Compliant
G. Parking:
• 7.1.1 General Design Standards: Compliant
• 7.1.2 On-Street Parking: Not Applicable
• 7.1.3 Interconnected Parking Lots: Not Applicable
• 7.1.4 Parking Area Access: Exception Granted
o Parking must be accessed from a rear alley or secondary frontage.
The proposed plan includes two existing curb cuts on Church Street configured for
controlled right-in/right-out access, with full access provided from Parsonage Lane. The
Applicant is continuing to review the driveway configuration with SCDOT, and preliminary
coordination indicates support for the proposed right-in/right-out access on Church Street
and full access on Parsonage Lane.
• 7.2 Bicycle Parking: Compliant
H. Streetscape and Site Landscaping:
• 8.1 Required Streetscape: Exception Required
o D-T5: 12 ft zone with 8 ft wide sidewalk and trees in wells or 6 ft wide planter beds.
The streetscape requirements are proposed as an 8ft sidewalk and 6ft planting strip along
Church Street, the primary frontage. Along Parsonage Lane, an 8ft sidewalk is proposed
without the required planting strip or tree wells.
• 8.2 Parking Area Landscaping:
• 8.2.1 Required Plantings: Compliant
• 8.2.2 Parking Area Screening: 3ft masonry wall matching the primary structure proposed
along Church Street frontage – Compliant
• 8.3 Streetscreens: Not Applicable
• 8.4 Fences: Not Applicable
I. Signage: Not Applicable – Signage will continue to be refined with staff through the sign permitting
process.
Planning Department
Design Review Board Meeting
09.01.2026
Carolina Foothills Federal Credit Union
520 N Church St
DRB Full and Final Review
Planning Department
Phone: (864) 596-2068 | email: planning@cityofspartanburg.org
website: www.cityofspartanburg.org
ADDITIONAL COMMENTS AND SUGGESTIONS FOR BOARD CONSIDERATION
1. The site plan meets the required D-T5 streetscape standards along North Church Street and Magnolia
Street. In response to comments provided by the Board during Preliminary Conceptual Review, the
Applicant has increased the proposed sidewalk width along Parsonage Lane to 8 feet. An exception is still
required from the required 6-foot planting area or tree wells along this frontage.
RECOMMENDATION
The following exceptions are required for Preliminary Approval:
1. 8.1 Required Streetscape: To permit an 8-foot-wide sidewalk along Parsonage Lane without the required
6-foot planting area or tree wells. The required D-T5 streetscape will be provided along North Church
Street and Magnolia Street.
NORTH CHURCH STREET(76' RIGHT-OF-WAY)
PARSONAGE LANE(RIGHT-OF-WAY UNKNOWN)
G
GG
GGG
G
MAGNOLIA STREET(44' RIGHT-OF-WAY)
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
SCALE: 1" = 60'3060120 0SE WN
R
Know what'sbelow.before you dig.Call
SITE OVERVIEWSITE LOCATION MAP
CIVIL ENGINEER & LANDSCAPE ARCHITECT:SEAMON, WHITESIDE & ASSOCIATES, INC104 N DANIEL MORGAN AVENUE, SUITE 300SPARTANBURG, SC 29306CONTACT: ANDREW ACKLEY, PEPHONE: (864) 272-1272EMAIL: AACKLEY@SEAMONWHITESIDE.COM
DEVELOPER:NEWGROUND15450 S OUTER FORTY DRIVE, SUITE 300CHESTERFIELD, MO 63017CONTACT: JOSEPH SCHWARZPHONE: (480) 688-3825EMAIL: JSCHWARZ@NEWGROUND.COMPOWER:DUKE ENERGY290 BEAUMONT AVENUESPARTANBURG, SC 29303CONTACT: STEVEN PRYORPHONE: (864) 948-5610
SURVEYOR:FREELAND & ASSOCIATES323 W STONE AVENUEGREENVILLE, SC 29609CONTACT: JONATHAN CLARK, PLSPHONE: (864) 271-4924
PROJECT CONTACTS
SEWER:SPARTANBURG SANITARY SEWER DISTRICT175 N LIBERTY STREETSPARTANBURG, SC 29306CONTACT: CASEY CROWNPHONE: (864) 580-5648
STORMWATER:CITY OF SPARTANBURGPUBLIC WORKS DEPARTMENT801 UNION STREETSPARTANBURG, SC 29302CONTACT: JAY SQUIRESPHONE: (864) 596-2089GAS:PIEDMONT NATURAL GAS4720 PIEDMONT ROW DRIVECHARLOTTE, NC 28210CONTACT: DEE DEE HANKSPHONE: (704) 364-3120
WATER:SPARTANBURG WATER SYSTEM175 N LIBERTY STREETSPARTANBURG, SC 29306CONTACT: KEVIN SMITHPHONE: (864) 580-5649
CAROLINA FOOTHILLS CREDIT UNIONSheet NumberSheet TitleC1.0TITLESHEETC1.1LEGEND & REVISION NOTESC2.0SURVEYC2.1EXISTING CONDITIONS & DEMOLITION PLANC5.0SITE PLANC7.0GRADING PLANC8.0DRAINAGE PLANC11.0UTILITY PLANL1.0LANDSCAPE PLANL1.1LIGHTING PLAN
DT-5 ZONING
221
N CHURCH STELVINS ST
MAGNOLIA ST
PARSONAGE LN
WOFFORD COLLEGE
TITLESHEET
ADJOININGPROPERTY LINECENTERLINE
EASEMENT
SETBACK
SEWER (GRAVITY)SEWER (FORCE MAIN)
WATER LINE
CURB & GUTTER(STRAIGHT)CURB & GUTTER(ROLL)
PREVIOUS PHASESTORM PIPE
ROOF DRAINSUBSURFACEDRAINAGE
SILT FENCE
REINFORCED SILT FENCE
PHASE LINE
DRAINAGE BASINLIMITS
FLOOD LINE
CONDUITNATURAL GASOVERHEADELECTRICALUNDERGROUNDELECTRICALTELEPHONEUNDERGROUNDCABLE
N/A
N/A
UNDERGROUNDFIBER OPTIC
FENCE
ELEVATION CONTOUR
SOUTH CAROLINA - DRAWING LEGEND
22
N/A
N/A
ZONE 'X'ZONE 'AE'
STORM PIPE(WIDTH VARIES WITH SIZE)(WIDTH VARIES WITH SIZE)N/A
NOTE: THIS LEGEND DOES NOT APPLY TO 'SURVEYING' SHEET(S).THOSE ARE SHOWN IN THE ORIGINAL FORMAT AS RECEIVED BY THE SURVEYOR.
N/A SWALE ARROW
RIGHT OF WAYLOT LINE
LINESEXISTINGNEW
REINFORCED SILT FENCE& TREE PROTECTIONN/A
22
PROPERTY BOUNDARY
N/A
REVISION CLOUD(ENCLOSES REVISION)N/A
N/A
BUFFERSTREAM BUFFERSTREAM CENTERLINEN/AN/A WETLAND BUFFERN/A
GUARDRAILTREELINEN/A
N/A SEWER SERVICE
N/A FIRE LINEN/A WATER SERVICE
NON TRENCH TREEPROTECTIONPOROUS BAFFLESEDIMENT TUBE
TREE PROTECTION
SILT FENCE & TREEPROTECTION
TURBIDITY BARRIER
N/AN/AN/A
N/A
N/A
N/A
SYMBOLSEXISTINGNEW
BENCHMARKN/A
SEWER MANHOLESEWER PUMP STATIONSEWER GREASE TRAPSEWER CLEANOUTSEWER OIL & WATERSEPARATORSEWER SERVICECONNECTIONSTORM TYPE 1
PS N/AN/A
N/AN/A
STORM TYPE 9STORM TYPE 16STORM TYPE 17 LEFTSTORM TYPE 17 RIGHTSTORM TYPE 18STORM CATCH BASINSTORM ISOLATION BOXSTORM JUNCTION BOXSTORM MANHOLESTORM OUTLETCONTROL STRUCTURESTORM YARD INLET(ROUND/RECTANGULAR)STORM FLARED ENDSECTIONSTORM BEEHIVE GRATEN/AN/A WATER METERWMWM
WATER METER RESIDENTIAL(SINGLE, DOUBLE)WATER DETECTOR CHECKWATER IRRIGATION METERWATER YARD HYDRANTWATER BACKFLOWPREVENTERBP
WATER BENDS(11.25°, 22.5°, 45°, 90°)WATER TEEWATER CROSSWATER CAPWATER BLOW OFFWATER BUTTERFLY VALVEWATER CHECK VALVEWATER GATE VALVEWATER POST INDICATORWATER TAPPINGSLEEVE AND VALVEWATER REDUCERWATER FIRE HYDRANTWATER FDC REMOTEWATER FDC ON BUILDING
N/AN/AN/AN/AN/AN/AN/AN/AN/AN/AN/A
N/AN/AN/A
N/AN/A
PROPERTY CORNER
WMWM
N/A
SWPPP SYMBOLSNEW
PORTABLE TOILET
ABBREVIATIONSEXISTING
ACCESS EASEMENT
NEW
EX. A.E.A.E. AUTHORITY HAVING JURISDICTIONEX. AHJAHJ CORRUGATED METAL PIPEEX. CMPCMP
STORM DRAINAGE EASEMENTEX. S.D.E.S.D.E.
DUCTILE IRON PIPEEX. DIPDIP GASKETED REINFORCEDCONCRETE PIPEEX. GRCPGRCP GENERAL UTILITY EASEMENTEX. G.U.E.G.U.E. HIGH-DENSITY POLYETHYLENE PIPEEX. HDPEHDPE HOME OWNER'S ASSOCIATIONEX. HOAHOA IN ACCORDANCE WITHEX. IAWIAW INGRESS/EGRESS EASEMENTEX. I/E E.I/E E. POLYVINYL CHLORIDE PIPEEX. PVCPVC POND MAINTENANCE EASEMENTEX. P.M.E.P.M.E. PROPERTY OWNER'S ASSOCIATIONEX. POAPOA REINFORCED CONCRETE PIPEEX. RCPRCP SEWER EASEMENTEX. S.E.S.E.
WATER EASEMENTEX. W.E.W.E. WATER SURFACE ELEVATIONEX. W.S.E.W.S.E.
HATCHESNEW
STANDARD DUTY ASPHALTHEAVY DUTY ASPHALT
PT
CONCRETE WASHOUTCW
CONSTRUCTION ENTRANCECONSTRUCTION ENTRANCEWITH TIRE WASHCHECK DAMSEDIMENT TUBESKIMMERSK FILTER FABRIC INLETPROTECTION (TYPE A)WIRE MESH & STONE INLETPROTECTION (TYPE B)BLOCK & GRAVEL INLETPROTECTION (TYPE C)SEDIMENT FILTER INLETPROTECTION (TYPE E)WEEP FILTER INLETPROTECTION (TYPE F)COMBO WEEP & SEDIMENTFILTER INLET PROTECTIONDANDY SACK OR GRATEGATOR INLET PROTECTIONBONDED FIBER MATRIX(SEE TURF AND GRASSES SPECIES)BF DUST CONTROLDC EROSION CONTROL BLANKETS(SEE TURF AND GRASSES SPECIES)EC FLEXIBLE GROWTH MEDIUM(SEE TURF AND GRASSES SPECIES)FG MULCHING(SEE TURF AND GRASSES SPECIES)M SURFACE ROUGHENINGSR
STONE OUTLET STRUCTURE
SODDING(SEE TURF AND GRASSES SPECS)S PERMANENT SEEDING(SEE TURF AND GRASSES SPECIES)PS TURF REINFORCEMENT MATTINGTR
RIPRAP (FES, BPE)
DOT ASPHALTMILL & OVERLAY (SCDOT)STANDARD DUTY CONCRETE(ADA PARKING SPACES)HEAVY DUTY CONCRETECONCRETE SIDEWALKCONCRETE SIDEWALK(RESIDENTIAL)DETECTABLE WARNINGGRAVELRIVER ROCKAGGREGATEFRESHWATER WETLANDFRESHWATER WETLAND BUFFERSALTWATER MARSHSALTWATER MARSH BUFFERSITE CLEARING AREAAREA PREVIOUSLY CLEAREDINCLUDED IN LIMITS OF DISTURBANCE
AREA TO BE PERMANENTLY STABILIZED
POWER POLE
LIGHT POLEELECTRIC BOXELECTRIC MANHOLECABLE PEDESTALTELEPHONE PEDESTALGAS VALVETREEADA PARKINGSIGNWHEELSTOPTRASH CAN
CTG
REVISION ID
N/AN/AN/AN/AN/A
N/A
BOLLARDN/AN/AN/A
SYMBOLSEXISTINGNEW
TEMPORARY SEEDING(SEE SCHEDULE IN EC NOTES)TS TYPICAL LOT EROSION CONTROLLE
TURF REINFORCEMENT MAT (SEETURF AND GRASSES SPECS)
N/A WALL
EROSION CONTROL MATTING
N/A GENERAL FLOWARROW
LIMITS OF DISTURBANCEN/A
GUY WIREN/A S
IB
DCSYICS
EE
1
BG
IBD
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
LEGEND & REVISION NOTES
NORTH CHURCH STREET(76' RIGHT-OF-WAY)
PARSONAGE LANE(RIGHT-OF-WAY UNKNOWN)
S
S
S
MAGNOLIA STREET(44' RIGHT-OF-WAY)
9' 18'
9'
18'
63'24'
24'
28'
14'
17'
30'
21'
10'
28.2'
20'
5'
61.68'
55.65'
18.66'
23'
22'
43.38'
R40'
R39'
R14'
R14'
R21'
DO NOT ENTER SIGN
SCDOT STOP SIGN,RIGHT TURN ONLY SIGN
STOP SIGN ANDSTOP BAR (TYP)
CONNECT TO EXISTINGCURB AND GUTTER
PROPOSED 18" CURB ANDGUTTER - CONNECT TOEXISTING CURB AND GUTTER
PROPOSED 18" CURB ANDGUTTER - CONNECT TOEXISTING CURB AND GUTTER
DRIVE THROUGH CANOPY
DO NOT ENTER SIGN
STOP SIGN, NORIGHT TURN SIGN
HVAC PAD
IN-GROUNDWASTE DISPOSAL
ADA PARKING SIGN
BIKE RACK
STANDARD DUTYASPHALT (TYP)
PROPOSED DIRECTIONAL ARROWPAVEMENT MARKINGS (TYP)STANDARD 18" CURBAND GUTTER (TYP)
STANDARD 18" CURBAND GUTTER (TYP)
SIDEWALK (TYP)
APPROXIMATE LOCATION OFEXISTING GUY WIRE NOT SURVEYED
PROPOSED 8' SIDEWALK
PROPOSED 8' SIDEWALK
PROPOSED 8' SIDEWALK
PROPOSED 8' SIDEWALK
PROPOSED BUILDING ±2,360 SF
3' TALL WALL - FACADE MATERIAL TOMATCH FACADE OF PROPOSEDBUILDING
3' TALL WALL - FACADE MATERIAL TOMATCH FACADE OF PROPOSEDBUILDING
3' TALL WALL - FACADE MATERIAL TOMATCH FACADE OF PROPOSEDBUILDING
BUILDING CANOPY
STANDARD DUTY ASPHALT
SITE LEGEND
STANDARD DUTY CONCRETE(ADA PARKING SPACES)CONCRETE SIDEWALKDETECTABLE WARNINGSURFACE
STANDARD CURB & GUTTER
SIGN
PROPERTY LINE
DOT ASPHALT
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
SCALE: 1" = 50'2550100 0
SE WN
R
Know what'sbelow.before you dig.Call
SITE PLAN
NORTH CHURCH STREET(76' RIGHT-OF-WAY)
PARSONAGE LANE(RIGHT-OF-WAY UNKNOWN)
G
S
S
S
GG
GGG
G
MAGNOLIA STREET(44' RIGHT-OF-WAY)
813
816
815
816
814
817
816
815
816
814
813
812
811
810810
811
812
813
814
814814814
813
811
813
814
817
812
816
815814
813
810
812
813
PROPOSED BUILDING±2,360 SFFFE: 813.00
812
811
STANDARD GRADING PLAN NOTES:1.FOR PROJECT SURVEY INFORMATION INCLUDING VERTICAL DATUM AND BENCHMARK LOCATIONS, SEE“PROJECT SURVEY INFORMATION AND CONTRACTOR VERIFICATION REQUIREMENTS” ON SHEET C1.0.2.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTINGCONDITIONS, INCLUDING BUT NOT LIMITED TO TOPOGRAPHIC, TREE, STORM DRAINAGE FACILITIES, AND ALLUTILITIES. EXISTING UTILITIES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BYTHE OWNER OR ENGINEER. THEREFORE, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXACTVERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UTILITIES. ANY DISCREPANCIES OR CONFLICTSIDENTIFIED DURING VERIFICATION OF EXISTING CONDITIONS AND UTILITIES SHALL BE REPORTED TO THEOWNER AND ENGINEER. ANY COSTS ASSOCIATED WITH CORRECTIVE WORK OR DAMAGES THAT ARE A RESULTOF THE CONTRACTOR NOT VERIFYING EXISTING CONDITIONS AND THE EXACT VERTICAL AND HORIZONTALLOCATION OF ALL EXISTING UTILITIES WILL BE THE CONTRACTOR'S RESPONSIBILITY.3.REFER TO ROADWAY PLAN & PROFILE SHEETS, DRAINAGE PLAN SHEETS, AND ROADWAY & DRAINAGE DETAILSHEETS FOR ADDITIONAL DRAINAGE AND GRADING INFORMATION AND REQUIREMENTS.4.REFER TO THE “SPOT ELEVATION KEY” FOR INFORMATION ON SPOT ELEVATIONS.5.COORDINATE WITH THE OWNER AND THE PROJECT GEOTECHNICAL CONSULTANT FOR LOT FILL COMPACTIONAND TESTING REQUIREMENTS.6.CONTRACTOR TO SELF-VERIFY THAT SITE GRADES, PONDS, POND DIKES, DRAINAGE PIPES, AND DRAINAGESTRUCTURES ARE CONSTRUCTED PER THE PLANS PRIOR TO REQUESTING FINAL AS-BUILT SURVEY FROMSURVEYOR.
EXISTING UTILITY NOTE:THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOTBEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINETHE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK, AND AGREES TO BE FULLYRESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR DUE TO THE CONTRACTOR'S FAILURE TO EXACTLYLOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
SPOT ELEVATION LEGEND
EXAMPLE: A: 12.56 MEANS THAT THE SURFACE OF NEW ASPHALT IS TO BE AT ELEVATION 12.56
BP - BREAK POINTBR - BOTTOM OF RAMP ELEVATIONBS - BOTTOM OF STAIRS ELEVATIONBW - FINISHED GRADE ELEVATION AT BOTTOM OF WALLBW/TW - FINISHED GRADE ELEVATION AT START/END OF WALLC - CONCRETE PAVING ELEVATIONF - (FLOW) ELEVATION AT WHICH SURFACE WATER FLOWS INTO DRAINAGE STRUCTURE
- SURFACE OF GRATE AT OUTSIDE EDGE FOR CATCH BASIN, GUTTER INLET, OR GRATED POND STRUCTURE - SURFACE OF ACCESS COVER FOR JUNCTION OR ISOLATION BOX - SURFACE OF ASPHALT ADJACENT TO THROAT OR GRATE AT CURB INLET
FFE - FINISHED FLOOR ELEVATIONG - (GUTTER) SURFACE OF FINISHED GUTTER AT LOWEST POINT (ALONG WATER FLOW PATH)HP - HIGH POINTLP - LOW POINTME - MATCH EXISTING (INDICATES TO MATCH ELEVATION OF EXISTING SURFACE AT POINT OF CONNECTION)PAD - FINISHED PAD ELEVATIONTC - TOP OF CURB ELEVATIONTR - TOP OR RAMP ELEVATIONTS - TOP OF STAIRS ELEVATIONTW - FINISHED GRADE ELEVATION AT TOP OF WALLW - (WALK) SURFACE OF FINISHED CONCRETE OR INTERLOCKING PAVER SIDEWALK, PATIO, PLAZA, OR SLAB
D - (DIRT) FINISHED GROUND ELEVATION
A - ASPHALT SURFACE OF FINISHED ASPHALT ROADWAY OR WALKING PATH
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
SCALE: 1" = 50'2550100 0
SE WN
R
Know what'sbelow.before you dig.Call
GRADING PLAN
NORTH CHURCH STREET(76' RIGHT-OF-WAY)
PARSONAGE LANE(RIGHT-OF-WAY UNKNOWN)
G
S
S
S
GG
GGG
G
MAGNOLIA STREET(44' RIGHT-OF-WAY)
A2.1 (CI-1)
A4 (CI-1)
A3 (CI-1)
A2 (CI-9)
A3.1 (CI-1)
A1 (CI-17L)
A0 EX (CI-17L)
60 LF 15" RCP
58 LF 15" RCP91 LF 15" RCP19 LF 15" RCP
44 LF 15" RCP
90 LF 15" RCP
816 817
816817
816
815
814
814
813
812
811
810
811
813
812
814
815
816
817
814814
813
817
816
815
814813
814
813
812811
810
813
812
813
816
EXISTING UTILITY NOTE:THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ITSREPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING ANY WORK, AND AGREES TO BE FULLYRESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR DUE TO THE CONTRACTOR'S FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL UNDERGROUNDUTILITIES.
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
SCALE: 1" = 50'2550100 0
SE WN
R
Know what'sbelow.before you dig.Call
DRAINAGE PLAN
STANDARD DRAINAGE PLAN NOTES:1.FOR PROJECT SURVEY INFORMATION INCLUDING VERTICAL DATUM AND BENCHMARK LOCATIONS, SEE “PROJECT SURVEY INFORMATION ANDCONTRACTOR VERIFICATION REQUIREMENTS” ON SHEET C1.0.2.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TOTOPOGRAPHIC, TREE, STORM DRAINAGE FACILITIES, AND ALL UTILITIES. EXISTING UTILITIES SHOWN ARE APPROXIMATE AND HAVE NOT BEENINDEPENDENTLY VERIFIED BY THE OWNER OR ENGINEER. THEREFORE, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXACT VERTICAL ANDHORIZONTAL LOCATIONS OF ALL EXISTING UTILITIES. ANY DISCREPANCIES OR CONFLICTS IDENTIFIED DURING VERIFICATION OF EXISTING CONDITIONSAND UTILITIES SHALL BE REPORTED TO THE OWNER AND ENGINEER. ANY COSTS ASSOCIATED WITH CORRECTIVE WORK OR DAMAGES THAT ARE ARESULT OF THE CONTRACTOR NOT VERIFYING EXISTING CONDITIONS AND THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UTILITIESWILL BE THE CONTRACTOR'S RESPONSIBILITY.3.REFER TO DRAINAGE PROFILE SHEETS, ROADWAY PLAN & PROFILE SHEETS, GRADING PLAN SHEETS, AND ROADWAY & DRAINAGE DETAIL SHEETS FORADDITIONAL DRAINAGE AND GRADING INFORMATION AND REQUIREMENTS.4.DRAINAGE PIPE LENGTHS PROVIDED REPRESENT DISTANCES FROM CENTER OF BOX TO CENTER OF BOX AND INCLUDE LENGTHS OF FLARED ENDSECTIONS. DRAINAGE PIPES ARE TO TERMINATE INSIDE THE DRAINAGE STRUCTURES IN ACCORDANCE WITH GOVERNING AUTHORITY REQUIREMENTS.5.ANY NECESSARY UNDERCUTTING OR MUCK AND FILL OPERATIONS ARE TO BE COORDINATED WITH THE OWNER AND THE PROJECT GEOTECHNICALCONSULTANT PRIOR TO EXECUTING THE WORK.6.PRIOR TO BEGINNING WORK WITHIN ANY PUBLIC RIGHT-OF-WAY OR EASEMENT, THE CONTRACTOR SHALL OBTAIN ANY APPLICABLE ENCROACHMENTPERMITS FROM THE OWNER OR ENGINEER AND IS RESPONSIBLE FOR FOLLOWING ALL REQUIREMENTS SPECIFIED IN THESE PERMITS.7.UNLESS OTHERWISE NOTED, REINFORCED CONCRETE PIPE (RCP) SHALL BE IN ACCORDANCE WITH ASTM C76, CLASS III, WALL B WITH SEALANT JOINTS(ASTM C990) PER NCDOT SPECIFICATIONS. ALL PIPE JOINTS SHALL BE WRAPPED WITH MINIMUM 18" WIDTH OF NON-WOVEN GEOTEXTILE.8.REFER TO DRAINAGE PROFILE SHEETS FOR ADDITIONAL RIM ELEVATION INFORMATION.9.SEE ROADWAY & DRAINAGE DETAILS FOR UNDERDRAIN DETAIL & REQUIREMENTS.10.CONTRACTOR SHALL INSTALL UNDERGROUND ROOF DRAINAGE PIPING WITH A MINIMUM COVER OF 1' AND MINIMUM 1.0% SLOPE AND VERIFY ROOFDRAINAGE LOCATIONS AND ELEVATIONS WITH PLUMBING PLANS PRIOR TO CONSTRUCTION. ROOF DRAINS SHALL BE A MINIMUM OF 8" UNLESSOTHERWISE SPECIFIED.
CI-1
GUTTER
TYPE 16, 17, 18 CURB INLETTYPE 1 CURB INLET
BOC
PAVEMENT
CATCH BASINS OR JUNCTION BOXESDRAINAGE STRUCTURE LEGEND & DEFINITION OF RIM ELEVATIONSN.T.S. - SEE DETAIL SHEET FOR STRUCTURE DETAILS
CI-18CI-17RCI-17LCI-16YIOCSIBCBJBSMH
GROUND**GROUND RIM*
TYPE-9 RIM = FRAME OR(THROAT ON TYPE 9) * RIM = ELEVATION AT CENTER OF TOP** TOP OF SLAB TO MATCH ADJACENT GROUND SLOPEGROUND PAVEMENTRIM (BOC) PAVEMENT
IBD CS
NORTH CHURCH STREET(76' RIGHT-OF-WAY)
PARSONAGE LANE(RIGHT-OF-WAY UNKNOWN)
G
S
S
S
GG
GGG
G
MAGNOLIA STREET(44' RIGHT-OF-WAY)
WM
CLEANOUT 1" WATER METER (TYP)
APPROXIMATE LOCATION OF EXISTINGSEWER LINE. CONTRACTOR TO FIELDVERIFY SIZE AND LOCATION
APPROXIMATE LOCATION OF EXISTING 8"WATER LINE. CONTRACTOR TO FIELDVERIFY SIZE AND LOCATION
6" SDR 35 PVC SANITARY SEWERSERVICE LINE - MIN. 1.0% SLOPE
1.5" HDPE DOMESTIC WATERSERVICE LINE (TYP)
IRRIGATION CONTROL VALVE
PROPOSED BUILDING±2,360 SFFFE: 813.00
STANDARD SEWER PLAN NOTES:1.FOR PROJECT SURVEY INFORMATION INCLUDING VERTICAL DATUM AND BENCHMARK LOCATIONS, SEE “PROJECT SURVEY INFORMATION AND CONTRACTOR VERIFICATION REQUIREMENTS” ON SHEET C1.0.2.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING EXISTING CONDITIONS, INCLUDING BUT NOT LIMITED TO TOPOGRAPHIC, TREE, STORM DRAINAGE FACILITIES, AND ALL UTILITIES. EXISTING UTILITIES SHOWN ARE APPROXIMATE AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BY THE OWNER OR ENGINEER. THEREFORE, THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING THE EXACT VERTICAL AND HORIZONTAL LOCATIONS OF ALL EXISTING UTILITIES. ANY DISCREPANCIES OR CONFLICTS IDENTIFIED DURING VERIFICATION OF EXISTING CONDITIONS AND UTILITIES SHALL BE REPORTED TO THE OWNER AND ENGINEER. ANY COSTS ASSOCIATED WITH CORRECTIVE WORK OR DAMAGES THAT ARE A RESULT OF THE CONTRACTOR NOT VERIFYING EXISTING CONDITIONS AND THE EXACT VERTICAL AND HORIZONTAL LOCATION OF ALL EXISTING UTILITIES WILL BE THE CONTRACTOR'S RESPONSIBILITY.3.MANHOLE COVERS ARE NOT ALLOWED WITHIN CURB AND GUTTER AND ARE TO BE INSTALLED COMPLETELY WITHIN OR COMPLETELY OUT OF PAVED AREAS (INCLUDING SIDEWALKS).4.SEWER MANHOLE CONES ADJACENT TO CURB AND/OR SIDEWALK RAMPS SHALL BE ROTATED TO LOCATE MANHOLE FRAME AND COVER AWAY FROM THE SIDEWALK RAMPS AND CURBS.5.REFER TO THE SEWER AUTHORITY’S STANDARD NOTES, DETAILS, AND SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS AND PROCEDURES, INCLUDING WATERTIGHT MANHOLE LOCATIONS.6.REFER TO SEWER DETAIL SHEETS AND SEWER PROFILE SHEETS FOR DETAILS AND ANY ADDITIONAL SEWER SYSTEM INFORMATION.
EXISTING UTILITY NOTE:THE LOCATION OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY AND HAVE NOT BEEN INDEPENDENTLY VERIFIED BYTHE OWNER OR ITS REPRESENTATIVE. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING ANYWORK, AND AGREES TO BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT OCCUR DUE TO THE CONTRACTOR'S FAILURE TO EXACTLYLOCATE AND PRESERVE ANY AND ALL UNDERGROUND UTILITIES.
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
SCALE: 1" = 50'2550100 0
SE WN
R
Know what'sbelow.before you dig.Call
UTILITY PLAN
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
W
WM
NORTH CHURCH STREET(76' RIGHT-OF-WAY)
PARSONAGE LANE(RIGHT-OF-WAY UNKNOWN)
EPEP
EDED
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
EP
G
S
S
S
GG
GGG
G
MAGNOLIA STREET(44' RIGHT-OF-WAY)
SCDOT SIGHT TRIANGLES ARE CONCEPTUALAND ARE SUBJECT TO CHANGE
SIGHT TRIANGLES,TYP
IMPORTANT:ALL PLANTS WITHIN SCDOT SIGHT TRIANGLESHALL NOT BE GREATER THAN 30"
RELOCATED UNDERSTORY STREETTREE FROM NORTH CHURCH ST
RELOCATED UNDERSTORY STREETTREE FROM NORTH CHURCH ST
PROPOSED BUILDING±2,360 SF
HVAC PAD
6'TYP
(14,383 sf) SEED
(1,975 sf) SODT(1) QUSP
(10) AM(7) DA(1) NSGG
(2) LR
(7) AZAE
(3) AG
(8) DICG(7) DA
(8) FG
(7) DA(1) QUSP(3) LC
(5) DA
(1) AG(5) DA
(8) LC(5) AZAE
(7) DICG(7) NT(2) NSGG
(3) LC(1) AG
(248 sf) SODT
(423 sf) SODT
(683 sf) SODT(2) QUSP(12) NT(12) NT
(144 sf) SODT
(6) NT
(7) NT
(3) LC (7) PM(8) LOCP
IMPORTANT:ALL PLANTS WITHIN SCDOT SIGHT TRIANGLESHALL NOT BE GREATER THAN 30"
6'TYP
(3) AG(6) AM(9) LOCP
(3) AM(9) AZAE(10) DA
(3) NSGG(4) LR(3) AM
TREE IDENTIFIED FOR REMOVAL HAS BEEN ESTIMATED TO BEAT LEAST 24" DBH. TREE REPLACEMENT REQUIREMENTS AREMET WITH ADDITIONAL TREES. RELIEF MUST BE GRANTED BYTHE CITY OF SPARTANBURG BEFORE REMOVAL.
(8) DA(464 sf) SODT
6'TYP
NOTES: 1.APPLY 6' DIAMETER MULCH RING TO ALL TREES IN TURF AREAS.2.SOD/SEED ALL DISTURBED AREAS NOT COVERED BY MULCH,VEGETATION, OR HARDSCAPE. DO NOT LEAVE BARE SOIL EXPOSED.3.NO IRRIGATION COMPONENTS, INCLUDING BUT NOT LIMITED TO, VALVEBOXES, CONTROL BOXES, BACKFLOW PREVENTERS, AND/OR RAINSENSORS ARE ALLOWED TO BE INSTALLED WITHIN DEPARTMENT OFTRANSPORTATION RIGHT-OF-WAY.4.THERE WILL BE NO SUBSTITUTIONS, DELETIONS, OR ADDITIONSWITHOUT APPROVAL OF THE LANDSCAPE ARCHITECT.5.ALL PLANTINGS WILL BE MECHANICALLY IRRIGATED.6.LANDSCAPE PLAN MAY ADJUST PER FINAL UTILITY PLAN.
LANDSCAPE REQUIREMENTS:NORTH CHURCH ST FRONTAGE: 211 LFREQUIRED:·2 CANOPY TREES·4 UNDERSTORY TREES·9 LARGE EVERGREEN SHRUBS OR 17 SMALL EVERGREEN SHRUBSPROVIDED:·2 CANOPY TREES·4 UNDERSTORY TREES·34 SMALL EVERGREEN SHRUBS*3 UNDERSTORY TREES HAVE BEEN RELOCATED DUE TO SCDOT REQUIRED SIGHT DISTANCEPARSONAGE LN FRONTAGE: 345 LFREQUIRED:·4 CANOPY TREES·7 UNDERSTORY TREES (TREE CREDIT TO ACCOUNT FOR 3)·14 LARGE EVERGREEN SHRUBS OR 28 SMALL EVERGREEN SHRUBSPROVIDED:·4 CANOPY TREES·4 UNDERSTORY TREES·28 SMALL EVERGREEN SHRUBSMAGNOLIA ST FRONTAGE: 84 LFREQUIRED:·3 UNDERSTORY TREES·4 LARGE EVERGREEN SHRUBS OR 7 SMALL EVERGREEN SHRUBSPROVIDED:·3 UNDERSTORY TREES·9 SMALL EVERGREEN SHRUBSPARKING:REQUIRED: (1) TREE + (8) SHRUBS/ 10 PARKING SPACESPROPOSED PARKING: 16 SPACESREQUIRED: (2) TREES + (13) SHRUBSPROVIDED: (4) TREES + (13) SHRUBS*NOTE: NO SPACE MAY BE FURTHER THAN 60' FROM THE TRUNK OF A TREEAND PARKING AREAS MUST BE SCREENED FROM ROW.
NEWGROUNDCarolina Foothills FederalCredit Union 520 N. Church St.Spartanburg, SC 2930306/25/26SD001
SCALE: 1" = 50'2550100 0
SE WN
R
Know what'sbelow.before you dig.Call
LANDSCAPE PLAN
LOBBYHOSPITALITYTELLERSIT/SERVER ROOMCOPY/PRINTBREAKROOMRESTROOMRESTROOMWELLNESSELEC./MECH/STORJANITORCL.OFFICEOFFICEOFFICE
LOGOCOMMUNITY SHOWCASETVCREDIT UNION VALUES DISPLAYMECHANICAL EQUIPMENT
2SD0041SD004NEWGROUNDCarolina Foothills FederalCredit UnionFLOOR PLAN520 N. Church St.Spartanburg, SC 2930308/07/2026SD002NPLAN NORTH10'-8"5'-4"2'-8"0
TVSDHDABCCDEEB
NEWGROUNDCarolina Foothills FederalCredit UnionREFLECTED CEILING PLAN520 N. Church St.Spartanburg, SC 2930308/07/2026SD003NPLAN NORTH16'-0"8'-0"4'-0"0
A: EXTERIOR LIGHTING -RECESSED DOWNLIGHTB: INTERIOR LIGHTING -RECESSED DOWNLIGHTC: INTERIOR LIGHTING -DECORATIVE PENDANTD: INTERIOR LIGHTING -DECORATIVE PENDANT (CLUSTER OF 3)E: INTERIOR LIGHTING -RECESSED TROFFER
FIRST FLOOR0"
B.O. ROOF DECK (LOW ROOF)13' -0"
CONCRETE FOUNDATION; COORDINATED WITH STRUCTURAL DRAWINGSCONCRETE SLAB OVER VAPOR BARRIER & COMPACTED GRANULAR BASE - COORDINATE WITH STRUCTURAL DRAWINGSFINISH GRADEBRICK VENEER W/MASONRY TIES @ 16" O.C. EACH WAYCAST STONE BAND(41 COURSES)9' - 1 3/8"(25 COURSES)5' - 6 3/8"CEILING SYSTEM, AS SCHEDULED6" METAL STUD WITH INSULATION AND 5/8" GYP. BD.STEEL FRAMING, SEE STRUCTURALFULLY ADHERED SINGLE PLY ROOFING SYSTEM ON TAPERED INSULATION AND FLAT STOCK (R-25 MINIMUM) RIGID INSULATIONPREFINISHED METAL COPING
EXTERIORINTERIORMANUFACTURER: CLOUD CERAMICSSTYLE: MIDNIGHT GREY / GREY GROUTFIRST FLOOR0"
T.O. PARAPET22' -4"
FINISH GRADECONCRETE FOUNDATION, COORDINATE WITH STRUCTURAL DRAWINGSSTEEL FRAMING1/2" EXTERIOR SHEATHINGADHERED MVIS SYSTEM ON 1/2" CEMENT BD. OVER 1-1/2" METAL 'Z' FURRING @ 16" O.C. ALIGN FURRING WITH STUDSSIGNCAST STONE COPINGSELF-ADHERED FLEXIBLE FLASHING MEMBRANE OVER 2 LAYERS, PT 3/4" PLYWOOD & 2X8 WD. BLOCKING, PROVIDE WEEPS @ 24" O.C.MANUFACTURER: BUECHEL STONESTYLE: CHILTON RUSTIC LEDGESTONE3-5/8" METAL STUD FRAMING @ 16" O.C.
NEWGROUNDCarolina Foothills FederalCredit UnionWALL SECTIONS520 N. Church St.Spartanburg, SC 2930308/07/2026SD0043/8" = 1'-0"EXTERIOR WALL SECTION - BRICK1 3/8" = 1'-0"EXTERIOR WALL SECTION - STACKED STONE2
SL.SL.SL.SL.SL.SL.SL.SL.SL.SL. SL.SL.SLOPE 1/4" PER FT.
SL.SL.SL.SL.SL.SL.SL.SL.SL.SL.
SLOPE 1/4" PER FT.
SLOPE 1/4" PER FT.SLOPE 1/4" PER FT.SLOPE 1/4" PER FT.
SLOPE 1/4" PER FT.
SLOPE 1/4" PER FT.SLOPE 1/4" PER FT.SLOPE 1/4" PER FT.
SLOPE 1/4" PER FT.SLOPE 1/4" PER FT.10'-8"5'-4"2'-8"0
2SD004
NEWGROUNDCarolina Foothills FederalCredit UnionROOF PLAN520 N. Church St.Spartanburg, SC 2930308/07/2026SD0053/16" = 1'-0"ARCHITECTURAL ROOF PLAN1 NPLAN NORTH
GRADE0' - 0"LOW ROOF13' - 0"HIGH ROOF22' - 4"MANUFACTURER: BUECHEL STONESTYLE: CHILTON RUSTIC LEDGESTONEMANUFACTURER: CLOUD CERAMICSSTYLE: MIDNIGHT GREY / GREY GROUTMANUFACTURER: ROCK CAST STYLE: PRECAST STONE - CHARLOTTE TANMANUFACTURER: ALPOLIC STYLE: ALUMINUM METAL PANEL - WAO ORANGEMANUFACTURER: ALPOLICSTYLE: ALUMINUM METAL PANEL - BGY GREYCBA DEAB CCC CDE
NEWGROUNDCarolina Foothills FederalCredit UnionEXTERIOR ELEVATIONS -EAST520 N. Church St.Spartanburg, SC 2930308/07/2026SD00610'-0"5'-0"2'-6"0
GRADE0' - 0"LOW ROOF13' - 0"HIGH ROOF22' - 4"MANUFACTURER: BUECHEL STONESTYLE: CHILTON RUSTIC LEDGESTONEMANUFACTURER: CLOUD CERAMICSSTYLE: MIDNIGHT GREY / GREY GROUTMANUFACTURER: ROCK CAST STYLE: PRECAST STONE - CHARLOTTE TANMANUFACTURER: ALPOLIC STYLE: ALUMINUM METAL PANEL - WAO ORANGEMANUFACTURER: ALPOLICSTYLE: ALUMINUM METAL PANEL - BGY GREYCBA DEABCCCC D
NEWGROUNDCarolina Foothills FederalCredit UnionEXTERIOR ELEVATIONS -WEST520 N. Church St.Spartanburg, SC 2930308/07/2026SD00710'-0"5'-0"2'-6"0
GRADE0' - 0"LOW ROOF13' - 0"HIGH ROOF22' - 4"MANUFACTURER: BUECHEL STONESTYLE: CHILTON RUSTIC LEDGESTONEMANUFACTURER: CLOUD CERAMICSSTYLE: MIDNIGHT GREY / GREY GROUTMANUFACTURER: ROCK CAST STYLE: PRECAST STONE - CHARLOTTE TANMANUFACTURER: ALPOLIC STYLE: ALUMINUM METAL PANEL - WAO ORANGEMANUFACTURER: ALPOLICSTYLE: ALUMINUM METAL PANEL - BGY GREYCBA DEAB BCCCCE
NEWGROUNDCarolina Foothills FederalCredit UnionEXTERIOR ELEVATIONS -SOUTH520 N. Church St.Spartanburg, SC 2930308/07/2026SD00810'-0"5'-0"2'-6"0
GRADE0' - 0"LOW ROOF13' - 0"HIGH ROOF22' - 4"MANUFACTURER: BUECHEL STONESTYLE: CHILTON RUSTIC LEDGESTONEMANUFACTURER: CLOUD CERAMICSSTYLE: MIDNIGHT GREY / GREY GROUTMANUFACTURER: ROCK CAST STYLE: PRECAST STONE - CHARLOTTE TANMANUFACTURER: ALPOLIC STYLE: ALUMINUM METAL PANEL - WAO ORANGEMANUFACTURER: ALPOLICSTYLE: ALUMINUM METAL PANEL - BGY GREYCBA DEAB CCC CD
NEWGROUNDCarolina Foothills FederalEXTERIOR ELEVATIONS -NORTH520 N. Church St.Spartanburg, SC 29303SD00910'-0"5'-0"2'-6"0
NEWGROUNDCarolina Foothills FederalCredit UnionPERSPECTIVE ILLUSTRATION -4A520 N. Church St.Spartanburg, SC 2930308/07/2026SD010
NEWGROUNDCarolina Foothills FederalCredit UnionPERSPECTIVE ILLUSTRATION -4B520 N. Church St.Spartanburg, SC 2930308/07/2026SD011
NEWGROUNDCarolina Foothills FederalCredit UnionPERSPECTIVE ILLUSTRATION -4C520 N. Church St.Spartanburg, SC 2930308/07/2026SD012
NEWGROUNDCarolina Foothills FederalCredit UnionPERSPECTIVE ILLUSTRATION -4D-1520 N. Church St.Spartanburg, SC 2930308/07/2026SD013
NEWGROUNDCarolina Foothills FederalCredit UnionPERSPECTIVE ILLUSTRATION -4D-2520 N. Church St.Spartanburg, SC 2930308/07/2026SD014
Source: City of Spartanburg website. First collected Oct 17, 2026.