Edgefield County Planning
Commission
County Council Chambers
May 9, 2024
Work Session 5:00 PM
Meeting 6:00 PM
The next Planning Commission Meeting is scheduled for June 13, 2024
Edgefield County Planning Commission
Work Session Agenda
County Council Chambers
May 9, 2024
5:00 PM
This agenda may be modified at any time prior to or during the meeting described herein.
The meeting may begin after the advertised start time if a reasonable adjustment to the
advertised start time is needed for any reason.
I. Call to Order
II. Guest Speakers
a) Representatives from Luck Companies, Katie Kosloski, Ben Thompson,
and Susan Mitchell, will be present for brief review and questions.
b) Representative from ECLS Global Inc., Jack Hobbs, for questions
regarding Mt Vintage Land Development Application.
III. Old Business
Brief discussion regarding Comprehensive Plane Changes
IV. New Business
a) Review of Land Development Application for a proposed Mining
Operation to be located off of Woodlawn Road in Clarks Hill, Parcel ID
#058-00-00-039-000
b) Review of a Land Development Application submitted by ECLS Global
Inc. and representing Stanley Martin Homes, proposing the
development of current buffer/greenspace for the development of a
single-family residential unit to be located off of Eutaw Springs Trail,
Parcel ID # 099-01-05-044-000.
V. Adjourn
To watch the Planning Commission Work Session, live: Subscribe to our YouTube Account –
Edgefield County Government. You can be notified of upcoming live streams.
The next Planning Commission Meeting is scheduled for June 13, 2024. The Planning
Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a
work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers,
located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancelation or
change. The public will be notified of any cancelation or change. Individuals requiring special
assistance or a sign interpreter to participate in the meeting are asked to please notify the
Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any
questions regarding the Planning Commission should be directed to the County’s Planner
April Morgan Amorgan@edgefieldcounty.sc.gov
4
Memorandum
To: Edgefield County Planning Commission
From: April Morgan, Edgefield County Planner
Date: April 15, 2024
Re: Land Development Application (Luck Company)
Applicant: Luck Companies
Property Owner: Wilkie Development, LLC
Property Address:
(or) Location: Woodlawn Road
Parcel ID: 058-00-00-039-000
Property Size: 434.93 (portion of the existing 1,717.32 acres
Land Use: Forrest
Zoning: UZ/ Un-zoned
Proposed Use: Quarry
Sewer/Septic: Septic & Sewer
Water: Well
Land Development Description
Luck Companies is proposing a Mining Operation to be located south of Stevens
Creek on Woodlawn Road in Clarks Hill. The Applicant intends to develop a quarry
on a portion of Edgefield County Parcel # 058-00-00-039-000, totaling 434.93
acres
The purpose of this operation is for the extraction and processing of rock, providing
infrastructure materials to the surrounding community.
Compliance with County Land Development Ordinances
• Permitted Use in Zoning District -Conditional
• Minimum Lot area requirements in Zoning District -300 Acres
Sec. 24-89 Mines and Quarries
1. Quarries and underground mines not permitted on lots less than 300
acres, and sand mines and borrow pits on not less than 30 acres in size.
2. No excavation activities shall occur within 300 ft of a residential
property line, and not within 100ft of any other property line.
3. No mining or quarrying activity shall occur within 50 ft of any river,
stream, lake, or
wetland.
5
4. No parking or accessory structures will be permitted within 50 ft of a
property line. Security structures shall be exempt from this requirement.
5. Prior to the start of any quarry operations the outer boundaries of the
operations area shall be continuously enclosed by a six (6) foot high chain-
link fence. Fencing along the entry road may be of a different type with
approval from the Planning Commission.
6. All private roads shall be kept wetted while being used or shall be oiled
or hard-surfaced and maintained to prevent the emanation of dust.
7. All private access roads leading off any public street or highway onto
property used for any purpose permitted in this zone shall be paved, with
heavy duty asphalt, or concrete not less than 6 inches in thickness, for the
first fifty (200) feet of said access road.
8. Required Signage: The outer boundaries of all property used for
quarrying operations, involving the extraction and processing of rock,
sand, gravel, decomposed granite, clay or similar materials shall be posted
with signs carrying the message “QUARRY ZONE” in letters not less than
four (4) inches in height, and in letters not less than one (1) inch in
height. These signs shall be posted at intervals not to exceed 300 ft.
9. A reclamation plan shall be submitted to the County before approval by
the planning commission and the applicant shall post a reclamation
guarantee for the area of disturbance giving financial assurance in a form
approved by Edgefield County, guaranteeing the satisfactory reclamation
of all disturbed areas. The amount of reclamation for permanent
commercial operations shall not be less than $1,000.00 per acre, with a
$10,000.00 minimum and shall be adjusted upon the renewal of the
operations plan to meet projected costs of reclamation based upon time,
material and equipment needed to clean-up and remove structures,
backfill, slopes (to include mine dumps) shall be graded to no greater than
a 3:1 finished slope or in relation to the contour of adjacent undisturbed
land, contour, redistribute and stabilize topsoil, re- vegetate, monitor, and
reseed if necessary. The release of the financial assurance and obligations
for reclamation shall not be made until the County planner, and County
Attorney approves the release in writing.
10. Activities that would produce excessive noise, dust, traffic, or other
activities that may constitute a public nuisance shall be restricted to
standard business hours.
11. A traffic study by a licensed engineer shall be completed for the
proposed operation. The study will analyze the traffic volumes at the
entrance intersection(s) of the proposed mine 2 or quarry roads and all
intersecting roads within one mile. The engineer will determine
6
what if any improvements are required on the adjoining roads. The study
will measure
the current level of the Level of Service (LOS) of the adjoining roadways
before and after
the development
7
Compliance with County Comprehensive Plan
• Permitted Land Use -Conditional
Approval by Other Regulatory Entities
• DHEC Storm Water / Sediment Control -Pending
• DHEC -Pending
a) Waste Water Control Permits
b) Mining Permits
c) NPDES Permits (Discharges Associated with Nonmetal Mineral Mining Facilities
from the DHEC Bureau of Water pursuant to the Pollution Control Act of South
Carolina and the Federal Clean Water Act which is administered by DHEC in
South Carolina.
d) Air Quality Permit
e) Wetlands Disturbance Permits
• ECWSA Tap Approval -NA
• Electric Utility -Pending
• SCDOT Encroachment -Pending
8
Planning Commission Action
Planning Commission, following public hearing and formal consideration of the application, may
determine to make the recommendation to approve, approve with conditions, or deny the permit.
The application will receive automatic approval on June 9, 2024 if no decision is reached by that
time. As sighted in the Edgefield County Code of Ordinances Sec. 24-252 (b) “The planning
commission shall hear and evaluate the application in relation to the following design and
improvement criteria. (1) Ingress and egress to the project site shall be designed to maximize
automotive and pedestrian safety and facilitate traffic flow. (2) Off-street parking, off-street
loading, refuse, and service areas shall be designed to minimize their visual and physical impact
on neighboring property. (3) Street right-of-way and pavement construction shall be adequate to
accommodate the type and volume of traffic anticipated. (4) The project shall be designed in
harmony with its physical surroundings and in such a manner as to ensure land use
compatibility.”
Final review for approval or denial will be issued by the Edgefield County Planning Director
Land Development Area
Aerial: (Image, Streets, Property red outline)
Land Use: (Land Use name under picture)
Zoning: (same as aerial with zoning)
Agriculture
Un-Zoned
9
Land Development Preliminary Plan
10
11
Other Documents
This project will be subject to all applicable Edgefield County Ordinance as well as
any agreed upon additional concessions during the Planning Commission and
Planning Director review.
Below are additional operating conditions Luck Companies has conditioned
themselves to maintain.
Luck Companies Operational Conditions
These Conditions, applicable to the intended, and ancillary, and customer-related property use
including, but not limited to, the extraction and processing of rock from the ground through the
means of blasting for the intended purpose of construction aggregate product (“Mining
Operations”), are voluntary proffered to be included and attached within the Luck Companies
(the “Applicant”) application for Conditional Use and Land Development of property located in
Edgefield County, South Carolina shown on the plan dated March 18, 2024, entitled “General
Development Plan” as portion of the parcel # 058-00-00-039-000 and hereafter referred to as the
“Property”. Development and use of the Property for Quarry Mining Operations pursuant to the
requested Conditional Use shall be subject to the following conditions, which shall be and
remain in effect for the duration of South Carolina Department of Health and Environmental
Control (“DHEC”) Surface Mining permit applicable to the Property:
Lot Size:
a) Acreage: The Applicant intends to develop a quarry on a portion of Edgefield County
Parcel #058-00-00-039-000, totaling 434.93 acres, in alignment with the Survey of
Property dated February 27, 2023.
b) Subdivision: Prior to the development of the site in preparation for Mining Operations,
434.93 acres of Edgefield County Parcel #058-00-00-039-000 will be subdivided from
the existing parcel totaling in alignment with the submitted survey
Permit:
c)
State Mining Permit: Prior to commencement of any land disturbance associated
with Mining Operations, Operator shall obtain the State Mining Permit from DHEC.
The State Mining Permit shall address all relevant issues including soil erosion,
stormwater management, air quality and reclamation. Completion of the reclamation
plan shall be secured by a bond posted with DHEC in accordance with its
regulations.
d) NPDES Permit: Prior to commencement of Mining Operations, Operator shall obtain
an NPDES General Permit for Discharges Associated with Nonmetal Mineral Mining
Facilities from the DHEC Bureau of Water pursuant to the Pollution Control Act of
South Carolina and the Federal Clean Water Act which is administered by DHEC in
South Carolina.
12
e) Air Quality Permit: Prior to commencement of Mining Operations, Operator shall obtain
an Air Quality Permit from the DHEC Bureau of Air Quality to ensure compliance with
the Federal Clean Air Act which is administered by DHEC in South Carolina. In
connection with the issuance of the Air Quality Permit, Operator shall develop and
implement a facility-wide plan for controlling fugitive dust and emissions from Mining
Operations including process operations, truck traffic, storage piles, and any other areas
within the Property where fugitive dust emissions can be generated.
Fugitive dust
generated from direct Mining Operations shall be controlled by wet suppression
and/or dry dust collection systems. Fugitive dust generated by vehicular traffic
within Mining Operations shall be controlled by the application of water or
equivalent wetting agent to roadways and other traveled surfaces on the Property.
f) Wetlands: All necessary permits to allow disturbance of jurisdictional wetlands on the
Property shall be obtained from the applicable governmental authority (e.g., U.S. Army
Corps. of Engineers, Edgefield County Government, or South Carolina DHEC).
g) Record Keeping: Operator shall maintain copies of all federal and state records pertaining
to permits and approvals on-site and, upon reasonable prior notice from County zoning
officials, Operator shall make copies of permits and approvals to County zoning officials
for review.
h) Geology: Ores and minerals extracted and processed from the Property will be limited to
those which are suitable for construction aggregate, except that topsoil and fill dirt (which
may include sand and clay) may also be extracted and processed from the Property, all in
accordance with the State Mining Permit and applicable law.
Buffers:
i) Excavation Buffer: No excavation activities which require the use of blasting will occur
within 300 feet of a residential property line, and not within 100 feet of any other
property line.
j) Wetland Buffer: Unless otherwise permitted, excavation activities related to the Mining
Operations will not occur within 50 feet of any river, stream, lake or wetland as defined
and delineated per the regulations outlined by the U.S Army Corps of Engineers and the
“Waters of the United States”.
k) Undisturbed Buffer: Luck Companies will not permit any parking or development within
50 feet of the Property boundary except for the permitted encroachment for access and
utilities.
l) Alignment with Permit: Buffers shall be provided in the general locations and of the
approximate widths shown on the on the plan included in this application dated March
18, 2024, and entitled “General Development Plan” (the “GDP”). Buffers shall consist of
undisturbed natural vegetation supplemented by berms, additional vegetation or
13
otherwise as necessary to comply with the requirements of the mining permit (the “State
Mining Permit”) issued to Operator for Mining Operations by the South Carolina
Department of Health and Environmental Control. Encroachments into buffers shall be
allowed for utility lines, roads, access points and such other encroachments or breaks as
necessary to conduct Mining Operations in accordance with the State Mining Permit.
m) Visual Screening: Mining Operations and related uses on the Property shall utilize berms
and/or screening landscape or supplemental plantings to minimize visibility from
Woodlawn Road (S-33-204).
Site Security:
n) Fencing: Prior to the commencement of Mining Operations, a six (6) foot tall chain-link
fence, or a fence with equivalent height and functional design, will be installed around
the perimeter of the Property prior to any site development related to the intended Quarry
Mining Use. A variation of fencing and gate which aligns with the company brand
aesthetic may be installed in accordance with a plan to be submitted by the Applicant to
the County as part of the site plan for development of the Property.
o) Required Signage: Prior to the commencement of Mining Operations, the outer
boundaries of all property used for Quarry Mining operations shall be posted with signs
carrying the message “QUARRY ZONE” in letters not less than four (4) inches in height.
These signs shall be posted at intervals not to exceed 300 feet.
Entrance Requirements:
p) Pavement: All private access roads leading off any public street or highway onto property
used for any purposed related to the Quarry Mining Use shall be paved, with heavy duty
asphalt, or concrete not less than six inches in thickness, for the first six hundred (600)
feet of said access road.
q) Pavement Analysis: In conjunction with Edgefield County and South Carolina
Department of Transportation permission, Luck Stone would be willing to preform
commercially reasonable cross-section sampling and analysis of existing pavement on
Woodlawn Road which could be placed on record with the appropriate Department of
Transportation authority. This analysis would be concurrent with commencement of site
development activities.
r) Traffic Study: A traffic study by a licensed engineer shall be completed for the proposed
operation. The study will analyze the traffic volumes at the entrance intersection(s) of
the proposed mine or quarry roads and all intersecting roads within one mile. The
engineer will determine what if any improvements are required on the adjoining roads.
The study will measure the current level of the level of service (LOS) of the adjoining
roadways before and after the development.
14
s) Ingress/Egress: Primary access to Mining Operations shall be limited to a single point
on Woodlawn Road (S-33-204) as generally shown on the GDP and approved by SC
Department of Transportation. The portion of such access located between Woodlawn
Road (S-33-204) and the area used for active mining may be shared by other users as
authorized by Operator.
t) Landscape: The entrance to the Property from Woodlawn Road (S-33-204) shall be
landscaped in accordance with a plan to be submitted by the Applicant to the County as
part of the site plan for development of the Property. Installation of the landscape shall
be installed at the first growing season following installation of the permitted entrance
access (concurrent if access construction occurs during a growing season).
u) Wash Down Facility: No later than the commencement of the sale of crushed stone
from the Property, wheel wash infrastructure will be installed for traffic leaving the
Property.
v) Entrance Inspections: Operator shall inspect the intersection of the Mining Operations
entrance Road and Woodlawn Road (S-33-204) daily for loose stone. Operator shall
remove any loose stone material at or around the entrance road outside of the right of
way of Woodlawn Road (S-33-204) if removal can be completed safety and without
interruption of traffic on Woodlawn Road (S-33-204). Operator shall solicit the
assistance of the appropriate agency (SCDOT, County Sheriff, etc.) with respect to
removal of stone within the right of way of Woodlawn Road (S-33-204) or as
otherwise required for safe removal without interruption of traffic on Woodlawn Road
(S-33-204).
Dust Suppression:
w) Roadways: All private roads will be kept wetted while being used or shall be hard-
surfaced and maintained to prevent dust.
x) Processing Plant: Dust Suppression shall be installed throughout any portable or
permanent plant utilized in the Quarry Mining Use in alignment with the Air Quality
Permit from the SC DHEC Bureau of Air Quality.
y) Tarping of Loads: In conjunction with state law, Luck Stone will encourage all loads
leaving the site to be covered by a tarp in effort to eradicate fugitive dust emissions while
the material is being transported.
Hours of Operation:
z) Mining Operations shall be restricted to the following standard business hours:
• Extraction Area, Primary Plant and Equipment: 6:00 a.m. to 7:00 p.m. Monday
through Friday only except as provided below.
• Shi pping, Loading and Limited Processing: 6:00 a.m. to 7:00 p.m. Monday
through Friday and 7:00 a.m. to 2:00 p.m. Saturday (“Standard Operating
Hours”) except as otherwise required in the event a federal, state, or local agency
15
or authority requests or requires that such activities be conducted during other
hours.
• Processing Plant (secondary, tertiary and/or finishing phases of plant
operations): Hours of operation for the processing plant shall be unrestricted
when operated without the use of trucks and loaders utilizing audible back-up
alarms (when operated with trucks and loaders utilizing audible back-up alarms,
Standard Operating Hours shall apply). Any vehicular operations during hours
other than Standard Operating Hours shall be for processing activities only and
shall not be for extraction activities.
• B
lasting: Blasting shall not occur before 9:30 a.m. or after 5:00 p.m. Monday
through Friday, except when a blasting charge has been set before 5:00 p.m. and
is delayed due to reasons beyond the reasonable control of Operator or due to
safety considerations. In such a case, Operator may then complete the blast after
5:00 p.m. but no later than thirty (30) minutes after sunset. There shall be no
blasting on Saturdays or Sundays except to complete a blast where the charge
was set and blasting delayed as described above.
Blasting:
aa) Record Keeping: Blasting Data shall be monitored and recorded for all blasts, shall be
maintained on-site for a period of three (3) years and shall be made available to County
zoning officials for review. Blasting Data shall include the time and date of blast,
pounds of blasting material per delay, total pounds of blasting materials per blast,
seismograph readings of ground vibration levels and air over-pressure levels in
decibels.
bb) Preblast Survey: Operator shall provide notice prior to the first blast associated with
Mining Operations (not site development/construction) either by (i) written notice via
direct mail to all property owners and/or occupants of existing dwellings within one-
half (1/2) mile of the areas where blasting will occur or (ii) advertisement two (2) times
in a local newspaper of general circulation at least ninety (90) days prior to the first
blast associated with Mining Operations blast. Upon receipt, pursuant to the above-
described notice, by DHEC and Operator of a written request from the owner of any
existing structures within one-half (1/2) mile of the areas where blasting will occur, a
third-party consultant selected and engaged by Operator shall conduct an inspection of
the applicable structures to determine the structural condition of the structures prior to
the first blast associated with Mining Operations. The property owner shall have the
right to supervise the inspection by the third-party consultant and shall be provided with
a copy of the consultant’s report.
cc) Regulatory Limits: State and Federal blasting vibration limits have been established to a
level that ensures a significant factor of safety to protect infrastructure and property
around a mine or construction site. Ground vibration caused by blasting activity shall
not exceed the maximum peak particle velocity allowed pursuant to South Carolina
Code of Regulations Section 89-150(E) as measured at the immediate location of any
dwelling, public building, school, church, or commercial or institutional building
existing as of the date of approval of the Special Exception to allow Mining Operations.
The maximum peak particle velocity requirement does not apply to structures within
16
the permitted area, or any area that is owned or leased by Operator or any structures on
which Operator has acquired waiver to damage rights.
dd) Blasting Complaints: If a formal claim is made by any private or public landowner
that the landowner or the property (real or personal) of the landowner has been
damaged by blasting activities associated with Mining Operations, whether by
ground vibration, air over-pressure or otherwise, an independent, qualified
professional with experience in the effects of blasting shall be engaged to
determine if any damage was caused by blasting activities associated with Mining
Operations. If it is determined that damage was caused by blasting activities
associated with Mining Operations, Operator shall correct the damage or reimburse
the landowner for such damage. The amount of any reimbursement shall be
determined by an independent, competent professional with expertise in estimating
the damage (for example, a licensed builder or building contractor where the
damage is to a residence). The independent professionals performing assessments
pursuant to this paragraph shall be agreed upon by both Operator and the property
owner and retained at the expense of Operator.
ee) Community Notification: Prior to each blast, Operator shall notify by email, text
and/or phone call those County residents or real property owners within a two-mile
radius of the site and County staff who have provided their names and contact
information (phone number, email, or text) to Operator. Operator will maintain the
notification list and individuals may add their names to the list at any time by
contacting the scale house at the quarry facility.
Wells and Water:
ff) Monitoring Wells: Operator shall construct multiple perimeter monitoring wells at
locations determined by an independent qualified professional (i.e., certified
hydrologist or geologist) and approved by DHEC. A plan describing the procedures
and timing of observance for the monitoring wells shall be developed by an independent
qualified professional and approved by DHEC and to be followed by Operator.
gg)
Water Well Impacts: Upon submission of a formal complaint by an adjacent
property, as acknowledged by DHEC, pursuant to the State Mine Permit, DHEC shall
determine if any activity associated with Mining Operations has caused a well or
wells on the adjacent property owner's land to become dry. If DHEC determines
that Mining Operations have caused the drying of the property owner's well,
Operator shall be responsible for providing an alternative water source (e.g., drill
well deeper, new well, or connect to public water source at the discretion of
Operator) for the aggrieved party at Operator's expense.
Reclamation:
hh) Plan and Bond: A copy of the DHEC approved mining reclamation plan shall be
submitted to the county before approval and the applicant shall provide verification of
a reclamation guarantee for the area of disturbance giving financial assurance in a form
approved by Edgefield County and DHEC, guaranteeing the satisfactory reclamation
17
of all disturbed areas. The amount of reclamation for permanent commercial operations
shall not be less than $1,000.00 per disturbed acre, with a $10,000.00 minimum and
shall be adjusted upon the renewal of the operations plan to meet projected costs of
reclamation based upon time, material and equipment needed to clean-up and remove
structures, backfill, slopes shall be graded to no greater than a 3:1 finished slope or in
relation to the contour of adjacent undisturbed land, contour, redistribute and stabilize
topsoil, re- vegetate, monitor, and reseed if necessary. The release of the financial
assurance and obligations for reclamation shall not be made until the county planner,
and county attorney approves the release in writing.
Community Interest:
ii) Community Engagement Group: Immediately prior to the commencement of Mining
Operations, Operator shall work with interested parties in the community to establish a
Community Engagement Group (the “CEG”) comprised of representatives of
homeowner associations or similar residential groups and interested individual
property owners located within a two (2) mile radius of Mining Operations. Operator
shall facilitate meetings with the CEG on a quarterly basis or as otherwise mutually
determined by Operator and the CEG to allow for information exchanges with respect
to historical Mining Operations, future plans for Mining Operations and other
community issues or opportunities of concern or interest of the CEG and Operator.
This condition is intended to provide a forum for communications among the CIEG
and Operator and does not grant any approval rights to the CEG with respect to Mining
Operations.
jj) Dedication of Easement for Public Trail: Subject to and upon approval of a
conditional use for mining activities and related uses on the Property and at
commencement of mining activities on the Property, the Applicant shall offer for the
dedication of an access easement over and across the length of the property line
adjoining Stevens Creek (the “Potential Trail Dedication”) shown on the plan included
in this application dated March 18, 2024 and entitled “General Development Plan” (the
“GDP”) on commercially reasonable terms and conditions for a public use
greenway/trail system.
Memorandum
To: Edgefield County Planning Commission
From: April Morgan, Edgefield County Planner
Date: April 18, 2024
Re: Land Development Application (ECLS Engineering Consultants & Land
Surveying)
Applicant: ECLS Engineering Consultants & Land Surveying
Property Owner: Stanley Martin Homes
Property Address:
(or) Location: Eutaw Springs Trail
Parcel ID: 099-01-05-044-000
Property Size: 0.67 Acres
Land Use: Buffer/Green Space
Zoning: RD
Proposed Use: Residential
Sewer/Septic: Sewer
Water: County Water
Land Development Description
Stanley Martin has submitted Application for the development of a parcel of land
located in the existing Mount Vintage Subdivision off of Eutaw Springs Road, parcel
ID#099-01-05-044-000. Stanly Martin is proposing to place a single-family
residential unit on this parcel.
Price Point
$400,000-$500,000
Compliance with County Land Development Ordinances
• Permitted Use in Zoning District - Permitted
• Minimum Lot area requirements in Zoning District - 0.50 Acres
• Application process for Land Development - Completed
Compliance with County Comprehensive Plan
• Permitted Land Use -Compliant
Approval by Other Regulatory Entities
• DHEC Storm Water / Sediment Control -Pending
• DHEC Waste Water Control -Pending
• ECWSA Tap Approval -Pending
• Electric Utility -Pending
• SCDOT Encroachment -NA
• Other Regulatory Entities -NA
19
Staff Analysis
Upon review of the approved Subdivision plats of record in the Edgefield County
RMS office, JR38150, and the preliminary plat presented, the parcel of land
proposed for development is currently part of established/approved/ required
Greenspace and Buffer area for one of the main entrances to Mount Vintage.
Implementation of natural buffers and green-space, by design, are to provide a
physical and visual barrier/space between properties, unlike uses, or traffic areas
reducing noise, air and light pollution and promoting aesthetics. Impact on these
things should be considered when making recommendation for approval, approval
with condition, or denial.
Planning Commission Action
Following Public Hearing the Planning Commission may vote on Preliminary Plat
approval for Mount Vintage Plantation. The proposal will receive automatic approval
on June 9, 2024 if no decision is reached by that time unless both the applicant and
the Planning Commission agree to an extension. As sighted in the Edgefield County
Code of Ordinances Sec. 24-251 “In its deliberation, the planning commission shall
approve, approve conditionally, or disapprove the plat. If the preliminary plat is
disapproved or approved conditionally, the reasons for such action shall be
conveyed to the applicant. The reasons for disapproval shall refer specifically to
those parts of the comprehensive plan or ordinance or regulation with which the
plat does not conform. On conditional approval, the commission may require the
applicant to resubmit the preliminary plat with all recommended changes before
approving the plat. If the preliminary plat is found to conform to all requirements of
this chapter, approval shall be given by the planning commission and shall be noted
in writing by the chairperson on at least two copies of the preliminary plat. One
copy shall be retained by the planning administrator and one copy given to the
applicant.” Final approval/ denial of the preliminary plat will be made by the
Edgefield County Planning Director.
20
Land Development Area
Aerial: (Image, Streets, Property red outline)
Land Use: (Land Use name under picture)
Zoning: (same as aerial with zoning)
Green Space/ Buffer
21
JR-38150/ Original Approved Plat
22
Land Development Property
(same as aerial but also addresses)
23
Land Development Preliminary Plan
24
Other Documents
25
Edgefield County
PLANNING COMMISSION
Meeting Agenda
County Council Chambers
May 9, 2024
6:00 PM
VI. Call to Order
A. Invocation
B. Pledge
VII. Approval of Agenda
A. Approval of May 9, 2024 Meeting Agenda
VIII. Approval of Minutes
A. Approval of April 11, 2024 Work Session Meeting Minutes
B. Approval of April 11, 2024 Meeting Minutes
IX. Guest Speakers
a) Representatives from Luck Companies, Katie Kosloski, Ben Thompson,
and Susan Mitchell, will be present for questions.
b) Representative from ECLS Global Inc. for questions regarding Mt
Vintage Land Development Application.
X. Reports
Staff report on Minor, Major and Exempt Subdivisions for the month of April
2024
XI. Public Hearing
a) Public Hearing regarding the Luck Companies proposed Mining
Operation and Preliminary Plat.
b) Public Hearing regarding the Land Development Application submitted
by ECLS Global Inc., for the development of Greenspace/ Buffer area
located in Mt Vintage Plantation Subdivision off of Eutaw Springs Trail,
Parcel ID# 099-01-05-044-000.
This agenda may be modified at any time prior to or during the meeting described herein. A
vote may be held on all agenda items. The meeting may begin after the advertised start time if a
reasonable adjustment to the advertised start time is needed for any reason
26
XII. Old Business
No Old Business
XIII. New Business
a) Final discussion and vote to recommend approval, approval with
conditions, or denial of the Luck Companies proposed Mining Operation
and Preliminary Plat.
b) Final discussion and vote to recommend approval, approval with
conditions, or denial of the Land Development Application submitted
by ECLS Global Inc., for the development of Greenspace/ Buffer area
located in Mt Vintage Plantation Subdivision off of Eutaw Springs Trail,
Parcel ID# 099-01-05-044-000.
XIV. Executive Session
No Executive Session
XV. Comments by the Planning Commission Chair
XVI. Adjourn
To watch the Planning Commission Meeting live: Subscribe to our YouTube Account –
Edgefield County Government. You can be notified of upcoming live streams.
The next Planning Commission Meeting is scheduled for June 13, 2024. The Planning
Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a
work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers
located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancelation or
change. The public will be notified of any cancelation or change. Individuals requiring special
assistance or a sign interpreter to participate in the meeting are asked to please notify the
Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any
questions regarding the Planning Commission should be directed to the County’s Planner
April Morgan Amorgan@edgefieldcounty.sc.gov
27
Edgefield County
PLANNING COMMISSION
Work Session Minutes
County Council Chambers
April 11, 2024
5:00 PM
28
The Edgefield County Planning Commission Work Session was held on Thursday April 11 th,
2024, at the Edgefield County Council Chambers at 225 Jeter Street in Edgefield at 5:00pm.
Notice of the time date and agenda of this meeting was provided to The Edgefield
Advertiser, placed on the Message Board outside Council Chambers, and provided to others
when requested. Any questions regarding the Planning Commission should be directed to
the County’s Planner April Morgan Amorgan@edgefieldcounty.sc.gov
Members present:
Fab Burt,
Karleen Butler,
Lisa Whitaker,
Tracy Walsh,
Members absent:
Sharon Hadden,
Staff present:
April Morgan,
Dharma Williams.
Hart Clark
David Caddell
County Council members present:
Guest Speakers:
Representatives from Luck
Companies, Katie Kosloski, Ben
Thompson, and Susan Mitchell
No votes held during work session.
29
I. Call to Order
Burt called the meeting to order at 5:00 pm.
II. Guest Speakers
Katie Kosloski thanks commissioners for their time and explains that there are
three representatives from Luck Companies who will answer questions.
Ben Thompson introduces himself. He states that he has been with Luck
Companies just shy of 20 years, prior to that he was a County Planner and he
worked in the engineering firm as well. As a team they are at the forefront of
the company as they grow and try to expand opportunities. They as a team
have spent a lot of time around the State for many years. He encourages the
commissioners to ask any questions they may have as this meeting is an open
discussion so that they can gain feedback.
Susan Mitchell introduces herself as the Community Engagement Manager and
having been with Luck Companies almost a year. She previously was with
marketing and communication and community outreach working on various
projects, most recently being the US Forestry. She states she also recently
worked with wastewater, stormwater, drinking water programs and getting them
out to the public along with nonprofit work. She explains that her background is
as a historian and that she loves the Edgefield Community.
Katie Kosloski introduces herself and her relationship with Luck, which has been
about 15 years including internships. She explains that she has a background in
Engineering and has spent time in the engineering department and project
management grounds, she took interest in the field and took a management
trainee roll in the field for about six years working in different operations in the
quarries across the East Coast. She continues that she became the first female
manager for Luck Stone and was running the Atlanta operation is one that
employees the most associates. She explains that now she gets to use her
background to look for new opportunities for the company to spread their
mission and create employment opportunities for people in the Southeast.
Clark and Morgan put a PowerPoint presentation on the screen, and Kosloski
explains that although it is a presentation she wants for this meeting with the
Planning Commission to be more of a discussion and invites them to ask
questions. She explains that they like to introduce themselves and their
backgrounds because they believe it is important to introduce themselves and
the organization and what they stand for.
Kosloski explains that Luck Companies itself was founded 101 years ago and
that entire time they have been family owned and operated by the Luck family.
The Luck family is in the office on a daily basis and they have been engaged for
three, almost four, generations. The thing that has been consistent throughout
30
the organizations is the commitment to people. The foundation of the business is
to create critical infrastructure materials, but the purpose is the people that we
work with and doing good to do well, and feeling as if we have a responsibility
as a community member to be active and engaged. In addition to the people
culture, we have a set of core values that come out in every meeting to help
make decisions on a daily basis. Luck Companies is the parent organization and
there are several different business units that comprise Luck Companies which
all have a focus on critical infrastructure materials but they each have a little bit
of a different purpose. The oldest business and the one you will hear most about
is Luck Stone, which was how to organization was started all those years ago.
They are focused on construction aggregate materials, which are the materials
that are mined from the earth for the purpose of concrete, asphalt, and drainage
rock. This supports our roads, schools, hospitals, anything that is built has to
have a foundation of stone. The mining industry as a whole is highly regulated.
I pride myself for working for an organization that sets the standard so not only
do we meet those expectation set by local, federal, and state agencies but we
set a lot of our standard operating procedures at half. Blasting limits are half of
those limits, our noise, etc. A lot of this has to do with the pride for our
organization and the folks in the community. The next two organizations speak
more towards our value of creativity and stemmed out of some of the creativity.
Luck ecosystems was formed from the need of generally when you mine rock
there is dirt or “overburden” which generally sits in a pile with not a lot of use,
but a team decided there had to have been something more to do with it. At the
same time there was a need in the construction industry for some environmental
sensitive materials that can help when you put in a parking lot and have run off
it can filter out some of the toxins that are being picked up from pavement. That
group is solely focused on creating these environmental products. They take
overburden and mix them with the materials. They also have a sports mix that
can be found on little league fields, one or two major league fields, and a lot of
small community fields. We also make golf course sand. The last business unit is
the Real Estate Group. There is a lot of land surrounding and buffering Luck
Stone project. The goal was to create the highest and best use to create more
jobs and tax revenues that did not put a strain on the local infrastructure. Their
job is to work with those local municipalities, and we are hopeful to have some
sort of economic development. Along with our values there was a huge interest
from other people both in the mining industry and other industries on leading
with those values. We call it values based leadership. Our founder was really
interested in being able to take that and deploy it to other folks so we have a
nonprofit called inner will and the entire focus is to help companies and people
establish core values and they take that on the road with a leadership team. The
Luck Family Foundation is a huge passion for being a part and supporting
communities and the Luck Family has found a way to do this through grants.
They also match donations with all the associates so if a donation is made to a
nonprofit the foundation will match it dollar for dollar up to a certain amount.
We hope to bring all of these businesses to Edgefield County at some point but
the first will be Luck Stone.
Whitaker asks why Edgefield County was chosen. Thompson states that he will
explain that during his presentation.
31
Thompson explains that since the great recession there has been a lot of
consolidation with the Construction Material industry. He continues that they had
two avenues, one being mission and vision of the company which is very sincere
and very real and the way it is done is the more touch points that they have are
more that they can extend positive impact, so growth is very important for that
reason. Growth is also very important because there is a statistic that 94% of
the company associates are all in continuing education. He explains that every
company has annual assessments and Luck Companies are a lot more regular
than that but about half of the conversation is about technically how you have
grown and what is your experience, and the other half is about what you have
done in the community and how you have expanded your education. This means
that the opportunities that get created just as employees gain greater scale is
very important to the company. On that consolidation of industries, Luck
Companies is the largest family owned and operated company in this space
however most comparators are large public companies, so with consolidation
everything that Luck is doing is supporting customers and the company wants to
spread to support more customers as they consolidate and grow as well.
Thompson continues to explain that a lot of time was spent looking at the
culture of the business and existing cultures and found the Southeast was more
focused in a heavy relationship way. He continues that the more time spent in
South Carolina, they believe it is a good fit for them. Initially, a small operation
just north of Camden was established which gave the company more familiarity
in South Carolina, and that site did well due to business communication. This
proved to the company that they made the right decisions with coming to South
Carolina. Since then, there has been a site permitted in Spartanburg County,
Fairfield County, Chester County, and looking at the footprint's desire, Edgefield
County was a good focus. Thompson shares that they believe the environment
of Edgefield County felt like a good fit for Luck Companies with its characteristics
as well as location between Aiken and Augusta and growth of the state and the
support of infrastructure upgrades. Thompson explains when looking they
considered the plans of Edgefield County and explains that it seems like the
County is very interested in respecting and retaining the rural characteristics
and being purposeful of where growth should be, which are items that Luck
Companies likes to see in a county’s plans as it shows they are looking at
“Smart Growth”. Thompson explains that they have been silently looking at site
in Edgefield County for roughly two years as their company has a due diligence
to find a site that works by looking at items like land use of the surrounding
properties, the road infrastructures and also the parameters that meet the
respect and environmental ethics and what has to be in the rock specifically.
Once this property was found in Edgefield on, there were many studies and tests
that had to be completed. The property is off Woodlawn Road about four and a
half miles west of Sportsman’s Corner, bordering the McCormick County line,
about a mile and a half east of Highway 28. This is an exceptionally rural portion
of the County but has good roadways that conversations with the SCDOT can be
made about the roads.
Burt asks if the area has already been cored, Thompson replies it has been
cored somewhere between 12-16 different holes which will be sent off to a lab
for studies to see if it meets the DOT standards. He explains this is one of the
32
many tests and studies that will be done on the property as this industry is a
very regulated industry that has many reviews and comments made during the
industry. He continues that if things continue in a positive fashion it will be
roughly an entire year of getting permits settled.
Whitaker asks the general duration of a project like this. Kosloski responds that
it somewhere north of 70 years depending on the demand of the material. She
explains that in the 100-year history of the company there have only been two
retired quarries, one of which will be used as water storage for the County, and
another is being used as overburden storage.
Walsh asks what was found in this specific quarry. Thompson explains it is a
granite material that can be used as a base for roads, foundations for houses
and the primary customers will be local concrete and asphalt companies.
Walsh explains that her and her children were able to tour a quarry in Columbia
and she had learnt that they developed a type of cubical piece concrete was
created with to make drainage easier. She asks if this is something specially
patented with only that quarry or if it is something that could be seen with Luck
Stone. Kosloski explains that Luck Stone does make that, it is called
manufactured sand because it mimics the shape of natural sand. She explains
that natural sand has a limited reserve in the United States especially in the
Southeast, so this is a supplement as a component of concrete. She continues to
explain that Luck Stone makes the same products as their competitors because
the DOT has certain the gradation or the mixture of rock sizes that they will
accept.
Whitaker asks how many careers will be available. Thompson explains that
queries are not large employers, so when starting there will be roughly 15-20
employees. He continues to explain that Luck Stone chooses not to use their
own trucking company because there is more control on the trucks if they are
contracted, but also because there are already existing people in this market
that the company does not want to displace but they rather hire them. That is
typically 50-75 employees. As the sites progress in volume more people need to
be added but will probably be capped around 25 associates. Kosloski explains
that these jobs do not require any experience, but all the training is in-house.
The classes for continuing education hosted on site can teach them things such
as how to weld, how to change a crusher, accounting and business, etc
depending on what the employee is interested in. Luck Stones also likes to
collaborate with local technical colleges.
Thompson continues to explain that the piece of property being discussed is in
total around 1,700 acres, but Luck Stone is talking about 420 acres of that. He
shows a drawing of the area and explains the site plan of what each area will be
used for. He explains that the 50-acre pit probably takes about 50 years to do.
He further explains that it will start very small with a portable office as it takes
off, and years later there will be an entrance and the company have high
expectations for themselves regarding the aesthetics of the company. He invites
the commissioners to look at one of their sites to see what it would look like.
Thompson explains the process of what it would look like as trucks enter, get
weighed, and exit. He states that 60% of the site will be open space and that
they consider what the property will be used for after it is finished, and they
take this into consideration when deciding where to put material. On the North
33
side of the property there will be a trail that runs along Stevens Creek as many
of their sites have trails and overlooks surrounding them for community to use.
One of the trails for the National Forrest is close and the idea is for the two trails
to connect. Thompson explains that this conversation has already begun with
Forestry.
Burt asks if the property is under contract.
Thompson explains it is under contract but has not yet been purchased.
Kosloski explains that the zoning ordinances have conditional uses for mining
and quarrying and it has several different design criteria in which have to be
met. Luck Stone is hopeful to meet and exceed that criterion, they have offered
36 operational conditions relating to aesthetics, dust, noise, community impact
teams, community interest such as the trails, etc. to gain the trust of the
community and meet or exceed the requirements of the county. Kosloski
explains that if Luck Stone is found to not be complying the County could
remove their right to mine and she hopes this will establish a level of trust with
the community that they will hold themselves accountable. Kosloski refers to a
document that shows what the County requires vs what Luck Companies will do
to meet these standards.
Clark explains that he did have a concern with Woodlawn Road because of the
large trucks making sharp turns. He explains that they have already passed
their DOT traffic study but that he has asked them to consider an improvement
of the intersection to help prevent the deterioration of Woodlawn Road and they
agreed to investigate, and they were more than happy to jump onto the
request. Clark encourages the commissioners to also point out concerns.
Butler agrees with Clark about the road as she lives across a quarry currently
and is aware of how the dump trucks can cause issues to the roads to where her
car tires deteriorate quickly. She asks about if there are many homes near
where the quarry would be. There is discussion of a few houses across the street
and towards Sportsmans Corner the residences begin to pick up again along
with a subdivision. Kosloski explains that they are hopeful to sit down with the
residents of the area and if they express any concerns, they will look into them
as well.
Burt and Clark discuss where they think traffic would flow and express concerns
on the shoulders of those roads and that he hopes that this will not be another
Sweetwater Road.
Thompson explains that the average amount of trucks will be 8 trucks an hour
and that he would say that a part of that DOT traffic study is doing the analysis
and the only area where improvement may be necessary is around the entrance.
Clark explains that he will put a link on the website with this traffic study. The
trip generation shows 278 trips per day with the majority between 11-2, not
early in the morning or late in the afternoon. At full development it would move
up to about 400 trips per day, which is not a huge traffic impact although they
are large trucks.
Walsh asks if the DOT requires turn lanes, Thompson explains no, but they need
some shoulder and drainage work.
Walsh asks if they allow field trips to the other sites. Kosloski explains that they
provided rock kits to schools for learning and that they do allow field trips.
Walsh explains that taking her children for a homeschool trip where they had
34
lunch, and a presentation was a wonderful experience. Thompson explains that
they have a yearly dinosaur walk for the students and there is a foundation
where one of the pillars is youth foundation.
Mitchell reminds commissioners that Luck Companies is a very family-based
company, and they treat one another as well as the communities as if they are
family. In the organization they have something called We Care, and it is a
slogan worn on shirts during volunteer work with schools, food banks, etc. It is
an ongoing mindset with the company. She explains that they are incredibly
involved in business development. She gives an example in Fairfield County
where the director of the Chamber of Commerce tells new business owners that
every entrance and the way every company should behave should be the same
as Luck Stone. She explains that she had individuals who did not want the
quarry at first are now glad the quarry is there. They sponsor events in
communities. The pillars they have are education, environment, and community
and each pillar is established when they enter a community, and they create
relationships in the community. She explains that she is looking for ideas to add
to the list of relationships. Thompson explains that he believes it says a lot that
it is the sole purpose of an entire department to build this relationship with the
community. Mitchell continues that they wish to help with long term visions for
the County and gives an example of the along with other committees and
company's they have partaken in a river restoration project at Chesapeake Bay
and oysters' population has returned due to Luck Companies contribution. She
also gives an example of a statue of secretariat (a racehorse) being built for a
major attraction near their home, and Luck Companies was asked to recreate
the composition of the three racetracks that he ran out to build the foundation
for this presentation. Walsh explains that there are not any recreation centers in
Edgefield for the kids and that she believes that if they had somebody to help
partner with a YMCA or other organization for the children.
Walsh asks what impact the blasts have on individuals who live nearby and if
they are warned beforehand. Kosloski explains there is a pre-blast survey that
will be completed and provided to homeowners, DHEC and Luck Stone. When
there is a first blast, there will be a posting in the paper and an opportunity to
sign up for text notices. She explains if they feel anything it will feel like a light
grumble, and they have seismographs to keep these blasts on record. The
sound, if there is any, will sound like thunder. If there is a low cloud cover it will
have sound of thunder. It is less than a second long and will be somewhere
between 1.5-2 times a month once it has started. Mitchell explains there will be
a public meeting for the community and the blaster will be present to ask
questions.
III. Old Business
No old Business was discussed
IV. New Business
No New Business was discussed
V. Adjourn
35
Whitaker motion to adjourn, butler second. All voted in favor (4-0)
Burt put the work Session to Adjourn at 6:00 pm.
36
Edgefield County
PLANNING COMMISSION
Meeting Minutes
County Council Chambers
April 11, 2024
6:00 PM
The Edgefield County Planning Commission Meeting was held on Thursday April 11, 2024 in
the Edgefield County Council Chambers at 225 Jeter Street in Edgefield at 6:00pm. Notice of
the time date and agenda of this meeting was provided to The Edgefield Advertiser, posted
on the message board outside of Council Chambers, and provided to others when
requested. Any questions regarding the Planning Commission should be directed to the
County’s Planner April Morgan Aprilmorgan@edgefieldcounty.sc.gov
Members present:
Fab Burt-Chairman. V,
Karlene Butler-Dist. IV,
Lisa Whitaker-Dist. III,
Tracy Walsh-At Large
Members absent:
Sharron Hadden Dist. V
Staff present:
April Morgan-Planner,
Dharma Williams-Planning Staff
Hart Clark-Planning Director
David Caddell
County Council members present:
Guests Speakers: No Guest Speakers
1
VI. Call to Order
Chairman Fab Burt called the meeting to order at 6:00 pm.
a. Invocation
Whitaker gave an invocation.
b. Pledge
Burt led the pledge of allegiance.
VII. Approval of Agenda
a. Approval of April 11 ,2024 Meeting Agenda
Walsh made a motion to approve the April 11,2024 agenda. Butler
seconded the motion. Burt put the motion to a vote. All present voted
in favor (4-0). Motion passed.
VIII. Approval of Minutes
a. Approval of March 14,2024 Work Session Meeting Minutes
Whitaker made a motion to approve the March 14,2024 Work Session
Meeting minutes. Butler seconded the motion. Burt put the motion to a
vote. All voted in favor (4-0). Motion Passed.
b. Approval of March 14,2024 Meeting Minutes
Whitaker made a motion to approve the March 14 ,2024 Meeting
minutes. Butler seconded the motion. Burt put the motion to a vote.
All voted in favor (4-0). Motion Passed.
IX. Guest Speakers
No Guest Speakers
X. Public Hearing
No Public Hearing
XI. Reports
Morgan gives a report on approval of land development and minor and
exempt subdivisions. There were six plat reviews, one land development
application for the RV and Boat storage was approved.
XII. Old Business
No Old Business
XIII. New Business
No New Business
XIV. Executive Session
No Executive Session
2
XV. Comments by the Planning Commission Chair
No comments made
XVI. Adjourn
Whitaker made a motion to adjourn. Walsh seconded the motion. Burt put
the motion to a vote. All voted in favor (4-0). Motion passed. The meeting
adjourned at 6:08 pm.