PC Packett_20240509_Revised

Edgefield County · Edgefield County · meeting of May 2, 2024 · Agenda packets

Open the original document More from Edgefield County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Edgefield County Planning Commission County Council Chambers May 9, 2024 Work Session 5:00 PM Meeting 6:00 PM The next Planning Commission Meeting is scheduled for June 13, 2024 Edgefield County Planning Commission Work Session Agenda County Council Chambers May 9, 2024 5:00 PM This agenda may be modified at any time prior to or during the meeting described herein. The meeting may begin after the advertised start time if a reasonable adjustment to the advertised start time is needed for any reason. I. Call to Order II. Guest Speakers a) Representatives from Luck Companies, Katie Kosloski, Ben Thompson, and Susan Mitchell, will be present for brief review and questions. b) Representative from ECLS Global Inc., Jack Hobbs, for questions regarding Mt Vintage Land Development Application. III. Old Business Brief discussion regarding Comprehensive Plane Changes IV. New Business a) Review of Land Development Application for a proposed Mining Operation to be located off of Woodlawn Road in Clarks Hill, Parcel ID #058-00-00-039-000 b) Review of a Land Development Application submitted by ECLS Global Inc. and representing Stanley Martin Homes, proposing the development of current buffer/greenspace for the development of a single-family residential unit to be located off of Eutaw Springs Trail, Parcel ID # 099-01-05-044-000. V. Adjourn To watch the Planning Commission Work Session, live: Subscribe to our YouTube Account – Edgefield County Government. You can be notified of upcoming live streams. The next Planning Commission Meeting is scheduled for June 13, 2024. The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers, located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancelation or change. The public will be notified of any cancelation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to please notify the Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Amorgan@edgefieldcounty.sc.gov 4 Memorandum To: Edgefield County Planning Commission From: April Morgan, Edgefield County Planner Date: April 15, 2024 Re: Land Development Application (Luck Company) Applicant: Luck Companies Property Owner: Wilkie Development, LLC Property Address: (or) Location: Woodlawn Road Parcel ID: 058-00-00-039-000 Property Size: 434.93 (portion of the existing 1,717.32 acres Land Use: Forrest Zoning: UZ/ Un-zoned Proposed Use: Quarry Sewer/Septic: Septic & Sewer Water: Well Land Development Description Luck Companies is proposing a Mining Operation to be located south of Stevens Creek on Woodlawn Road in Clarks Hill. The Applicant intends to develop a quarry on a portion of Edgefield County Parcel # 058-00-00-039-000, totaling 434.93 acres The purpose of this operation is for the extraction and processing of rock, providing infrastructure materials to the surrounding community. Compliance with County Land Development Ordinances • Permitted Use in Zoning District -Conditional • Minimum Lot area requirements in Zoning District -300 Acres Sec. 24-89 Mines and Quarries 1. Quarries and underground mines not permitted on lots less than 300 acres, and sand mines and borrow pits on not less than 30 acres in size. 2. No excavation activities shall occur within 300 ft of a residential property line, and not within 100ft of any other property line. 3. No mining or quarrying activity shall occur within 50 ft of any river, stream, lake, or wetland. 5 4. No parking or accessory structures will be permitted within 50 ft of a property line. Security structures shall be exempt from this requirement. 5. Prior to the start of any quarry operations the outer boundaries of the operations area shall be continuously enclosed by a six (6) foot high chain- link fence. Fencing along the entry road may be of a different type with approval from the Planning Commission. 6. All private roads shall be kept wetted while being used or shall be oiled or hard-surfaced and maintained to prevent the emanation of dust. 7. All private access roads leading off any public street or highway onto property used for any purpose permitted in this zone shall be paved, with heavy duty asphalt, or concrete not less than 6 inches in thickness, for the first fifty (200) feet of said access road. 8. Required Signage: The outer boundaries of all property used for quarrying operations, involving the extraction and processing of rock, sand, gravel, decomposed granite, clay or similar materials shall be posted with signs carrying the message “QUARRY ZONE” in letters not less than four (4) inches in height, and in letters not less than one (1) inch in height. These signs shall be posted at intervals not to exceed 300 ft. 9. A reclamation plan shall be submitted to the County before approval by the planning commission and the applicant shall post a reclamation guarantee for the area of disturbance giving financial assurance in a form approved by Edgefield County, guaranteeing the satisfactory reclamation of all disturbed areas. The amount of reclamation for permanent commercial operations shall not be less than $1,000.00 per acre, with a $10,000.00 minimum and shall be adjusted upon the renewal of the operations plan to meet projected costs of reclamation based upon time, material and equipment needed to clean-up and remove structures, backfill, slopes (to include mine dumps) shall be graded to no greater than a 3:1 finished slope or in relation to the contour of adjacent undisturbed land, contour, redistribute and stabilize topsoil, re- vegetate, monitor, and reseed if necessary. The release of the financial assurance and obligations for reclamation shall not be made until the County planner, and County Attorney approves the release in writing. 10. Activities that would produce excessive noise, dust, traffic, or other activities that may constitute a public nuisance shall be restricted to standard business hours. 11. A traffic study by a licensed engineer shall be completed for the proposed operation. The study will analyze the traffic volumes at the entrance intersection(s) of the proposed mine 2 or quarry roads and all intersecting roads within one mile. The engineer will determine 6 what if any improvements are required on the adjoining roads. The study will measure the current level of the Level of Service (LOS) of the adjoining roadways before and after the development 7 Compliance with County Comprehensive Plan • Permitted Land Use -Conditional Approval by Other Regulatory Entities • DHEC Storm Water / Sediment Control -Pending • DHEC -Pending a) Waste Water Control Permits b) Mining Permits c) NPDES Permits (Discharges Associated with Nonmetal Mineral Mining Facilities from the DHEC Bureau of Water pursuant to the Pollution Control Act of South Carolina and the Federal Clean Water Act which is administered by DHEC in South Carolina. d) Air Quality Permit e) Wetlands Disturbance Permits • ECWSA Tap Approval -NA • Electric Utility -Pending • SCDOT Encroachment -Pending 8 Planning Commission Action Planning Commission, following public hearing and formal consideration of the application, may determine to make the recommendation to approve, approve with conditions, or deny the permit. The application will receive automatic approval on June 9, 2024 if no decision is reached by that time. As sighted in the Edgefield County Code of Ordinances Sec. 24-252 (b) “The planning commission shall hear and evaluate the application in relation to the following design and improvement criteria. (1) Ingress and egress to the project site shall be designed to maximize automotive and pedestrian safety and facilitate traffic flow. (2) Off-street parking, off-street loading, refuse, and service areas shall be designed to minimize their visual and physical impact on neighboring property. (3) Street right-of-way and pavement construction shall be adequate to accommodate the type and volume of traffic anticipated. (4) The project shall be designed in harmony with its physical surroundings and in such a manner as to ensure land use compatibility.” Final review for approval or denial will be issued by the Edgefield County Planning Director Land Development Area Aerial: (Image, Streets, Property red outline) Land Use: (Land Use name under picture) Zoning: (same as aerial with zoning) Agriculture Un-Zoned 9 Land Development Preliminary Plan 10 11 Other Documents This project will be subject to all applicable Edgefield County Ordinance as well as any agreed upon additional concessions during the Planning Commission and Planning Director review. Below are additional operating conditions Luck Companies has conditioned themselves to maintain. Luck Companies Operational Conditions These Conditions, applicable to the intended, and ancillary, and customer-related property use including, but not limited to, the extraction and processing of rock from the ground through the means of blasting for the intended purpose of construction aggregate product (“Mining Operations”), are voluntary proffered to be included and attached within the Luck Companies (the “Applicant”) application for Conditional Use and Land Development of property located in Edgefield County, South Carolina shown on the plan dated March 18, 2024, entitled “General Development Plan” as portion of the parcel # 058-00-00-039-000 and hereafter referred to as the “Property”. Development and use of the Property for Quarry Mining Operations pursuant to the requested Conditional Use shall be subject to the following conditions, which shall be and remain in effect for the duration of South Carolina Department of Health and Environmental Control (“DHEC”) Surface Mining permit applicable to the Property: Lot Size: a) Acreage: The Applicant intends to develop a quarry on a portion of Edgefield County Parcel #058-00-00-039-000, totaling 434.93 acres, in alignment with the Survey of Property dated February 27, 2023. b) Subdivision: Prior to the development of the site in preparation for Mining Operations, 434.93 acres of Edgefield County Parcel #058-00-00-039-000 will be subdivided from the existing parcel totaling in alignment with the submitted survey Permit: c) State Mining Permit: Prior to commencement of any land disturbance associated with Mining Operations, Operator shall obtain the State Mining Permit from DHEC. The State Mining Permit shall address all relevant issues including soil erosion, stormwater management, air quality and reclamation. Completion of the reclamation plan shall be secured by a bond posted with DHEC in accordance with its regulations. d) NPDES Permit: Prior to commencement of Mining Operations, Operator shall obtain an NPDES General Permit for Discharges Associated with Nonmetal Mineral Mining Facilities from the DHEC Bureau of Water pursuant to the Pollution Control Act of South Carolina and the Federal Clean Water Act which is administered by DHEC in South Carolina. 12 e) Air Quality Permit: Prior to commencement of Mining Operations, Operator shall obtain an Air Quality Permit from the DHEC Bureau of Air Quality to ensure compliance with the Federal Clean Air Act which is administered by DHEC in South Carolina. In connection with the issuance of the Air Quality Permit, Operator shall develop and implement a facility-wide plan for controlling fugitive dust and emissions from Mining Operations including process operations, truck traffic, storage piles, and any other areas within the Property where fugitive dust emissions can be generated. Fugitive dust generated from direct Mining Operations shall be controlled by wet suppression and/or dry dust collection systems. Fugitive dust generated by vehicular traffic within Mining Operations shall be controlled by the application of water or equivalent wetting agent to roadways and other traveled surfaces on the Property. f) Wetlands: All necessary permits to allow disturbance of jurisdictional wetlands on the Property shall be obtained from the applicable governmental authority (e.g., U.S. Army Corps. of Engineers, Edgefield County Government, or South Carolina DHEC). g) Record Keeping: Operator shall maintain copies of all federal and state records pertaining to permits and approvals on-site and, upon reasonable prior notice from County zoning officials, Operator shall make copies of permits and approvals to County zoning officials for review. h) Geology: Ores and minerals extracted and processed from the Property will be limited to those which are suitable for construction aggregate, except that topsoil and fill dirt (which may include sand and clay) may also be extracted and processed from the Property, all in accordance with the State Mining Permit and applicable law. Buffers: i) Excavation Buffer: No excavation activities which require the use of blasting will occur within 300 feet of a residential property line, and not within 100 feet of any other property line. j) Wetland Buffer: Unless otherwise permitted, excavation activities related to the Mining Operations will not occur within 50 feet of any river, stream, lake or wetland as defined and delineated per the regulations outlined by the U.S Army Corps of Engineers and the “Waters of the United States”. k) Undisturbed Buffer: Luck Companies will not permit any parking or development within 50 feet of the Property boundary except for the permitted encroachment for access and utilities. l) Alignment with Permit: Buffers shall be provided in the general locations and of the approximate widths shown on the on the plan included in this application dated March 18, 2024, and entitled “General Development Plan” (the “GDP”). Buffers shall consist of undisturbed natural vegetation supplemented by berms, additional vegetation or 13 otherwise as necessary to comply with the requirements of the mining permit (the “State Mining Permit”) issued to Operator for Mining Operations by the South Carolina Department of Health and Environmental Control. Encroachments into buffers shall be allowed for utility lines, roads, access points and such other encroachments or breaks as necessary to conduct Mining Operations in accordance with the State Mining Permit. m) Visual Screening: Mining Operations and related uses on the Property shall utilize berms and/or screening landscape or supplemental plantings to minimize visibility from Woodlawn Road (S-33-204). Site Security: n) Fencing: Prior to the commencement of Mining Operations, a six (6) foot tall chain-link fence, or a fence with equivalent height and functional design, will be installed around the perimeter of the Property prior to any site development related to the intended Quarry Mining Use. A variation of fencing and gate which aligns with the company brand aesthetic may be installed in accordance with a plan to be submitted by the Applicant to the County as part of the site plan for development of the Property. o) Required Signage: Prior to the commencement of Mining Operations, the outer boundaries of all property used for Quarry Mining operations shall be posted with signs carrying the message “QUARRY ZONE” in letters not less than four (4) inches in height. These signs shall be posted at intervals not to exceed 300 feet. Entrance Requirements: p) Pavement: All private access roads leading off any public street or highway onto property used for any purposed related to the Quarry Mining Use shall be paved, with heavy duty asphalt, or concrete not less than six inches in thickness, for the first six hundred (600) feet of said access road. q) Pavement Analysis: In conjunction with Edgefield County and South Carolina Department of Transportation permission, Luck Stone would be willing to preform commercially reasonable cross-section sampling and analysis of existing pavement on Woodlawn Road which could be placed on record with the appropriate Department of Transportation authority. This analysis would be concurrent with commencement of site development activities. r) Traffic Study: A traffic study by a licensed engineer shall be completed for the proposed operation. The study will analyze the traffic volumes at the entrance intersection(s) of the proposed mine or quarry roads and all intersecting roads within one mile. The engineer will determine what if any improvements are required on the adjoining roads. The study will measure the current level of the level of service (LOS) of the adjoining roadways before and after the development. 14 s) Ingress/Egress: Primary access to Mining Operations shall be limited to a single point on Woodlawn Road (S-33-204) as generally shown on the GDP and approved by SC Department of Transportation. The portion of such access located between Woodlawn Road (S-33-204) and the area used for active mining may be shared by other users as authorized by Operator. t) Landscape: The entrance to the Property from Woodlawn Road (S-33-204) shall be landscaped in accordance with a plan to be submitted by the Applicant to the County as part of the site plan for development of the Property. Installation of the landscape shall be installed at the first growing season following installation of the permitted entrance access (concurrent if access construction occurs during a growing season). u) Wash Down Facility: No later than the commencement of the sale of crushed stone from the Property, wheel wash infrastructure will be installed for traffic leaving the Property. v) Entrance Inspections: Operator shall inspect the intersection of the Mining Operations entrance Road and Woodlawn Road (S-33-204) daily for loose stone. Operator shall remove any loose stone material at or around the entrance road outside of the right of way of Woodlawn Road (S-33-204) if removal can be completed safety and without interruption of traffic on Woodlawn Road (S-33-204). Operator shall solicit the assistance of the appropriate agency (SCDOT, County Sheriff, etc.) with respect to removal of stone within the right of way of Woodlawn Road (S-33-204) or as otherwise required for safe removal without interruption of traffic on Woodlawn Road (S-33-204). Dust Suppression: w) Roadways: All private roads will be kept wetted while being used or shall be hard- surfaced and maintained to prevent dust. x) Processing Plant: Dust Suppression shall be installed throughout any portable or permanent plant utilized in the Quarry Mining Use in alignment with the Air Quality Permit from the SC DHEC Bureau of Air Quality. y) Tarping of Loads: In conjunction with state law, Luck Stone will encourage all loads leaving the site to be covered by a tarp in effort to eradicate fugitive dust emissions while the material is being transported. Hours of Operation: z) Mining Operations shall be restricted to the following standard business hours: • Extraction Area, Primary Plant and Equipment: 6:00 a.m. to 7:00 p.m. Monday through Friday only except as provided below. • Shi pping, Loading and Limited Processing: 6:00 a.m. to 7:00 p.m. Monday through Friday and 7:00 a.m. to 2:00 p.m. Saturday (“Standard Operating Hours”) except as otherwise required in the event a federal, state, or local agency 15 or authority requests or requires that such activities be conducted during other hours. • Processing Plant (secondary, tertiary and/or finishing phases of plant operations): Hours of operation for the processing plant shall be unrestricted when operated without the use of trucks and loaders utilizing audible back-up alarms (when operated with trucks and loaders utilizing audible back-up alarms, Standard Operating Hours shall apply). Any vehicular operations during hours other than Standard Operating Hours shall be for processing activities only and shall not be for extraction activities. • B lasting: Blasting shall not occur before 9:30 a.m. or after 5:00 p.m. Monday through Friday, except when a blasting charge has been set before 5:00 p.m. and is delayed due to reasons beyond the reasonable control of Operator or due to safety considerations. In such a case, Operator may then complete the blast after 5:00 p.m. but no later than thirty (30) minutes after sunset. There shall be no blasting on Saturdays or Sundays except to complete a blast where the charge was set and blasting delayed as described above. Blasting: aa) Record Keeping: Blasting Data shall be monitored and recorded for all blasts, shall be maintained on-site for a period of three (3) years and shall be made available to County zoning officials for review. Blasting Data shall include the time and date of blast, pounds of blasting material per delay, total pounds of blasting materials per blast, seismograph readings of ground vibration levels and air over-pressure levels in decibels. bb) Preblast Survey: Operator shall provide notice prior to the first blast associated with Mining Operations (not site development/construction) either by (i) written notice via direct mail to all property owners and/or occupants of existing dwellings within one- half (1/2) mile of the areas where blasting will occur or (ii) advertisement two (2) times in a local newspaper of general circulation at least ninety (90) days prior to the first blast associated with Mining Operations blast. Upon receipt, pursuant to the above- described notice, by DHEC and Operator of a written request from the owner of any existing structures within one-half (1/2) mile of the areas where blasting will occur, a third-party consultant selected and engaged by Operator shall conduct an inspection of the applicable structures to determine the structural condition of the structures prior to the first blast associated with Mining Operations. The property owner shall have the right to supervise the inspection by the third-party consultant and shall be provided with a copy of the consultant’s report. cc) Regulatory Limits: State and Federal blasting vibration limits have been established to a level that ensures a significant factor of safety to protect infrastructure and property around a mine or construction site. Ground vibration caused by blasting activity shall not exceed the maximum peak particle velocity allowed pursuant to South Carolina Code of Regulations Section 89-150(E) as measured at the immediate location of any dwelling, public building, school, church, or commercial or institutional building existing as of the date of approval of the Special Exception to allow Mining Operations. The maximum peak particle velocity requirement does not apply to structures within 16 the permitted area, or any area that is owned or leased by Operator or any structures on which Operator has acquired waiver to damage rights. dd) Blasting Complaints: If a formal claim is made by any private or public landowner that the landowner or the property (real or personal) of the landowner has been damaged by blasting activities associated with Mining Operations, whether by ground vibration, air over-pressure or otherwise, an independent, qualified professional with experience in the effects of blasting shall be engaged to determine if any damage was caused by blasting activities associated with Mining Operations. If it is determined that damage was caused by blasting activities associated with Mining Operations, Operator shall correct the damage or reimburse the landowner for such damage. The amount of any reimbursement shall be determined by an independent, competent professional with expertise in estimating the damage (for example, a licensed builder or building contractor where the damage is to a residence). The independent professionals performing assessments pursuant to this paragraph shall be agreed upon by both Operator and the property owner and retained at the expense of Operator. ee) Community Notification: Prior to each blast, Operator shall notify by email, text and/or phone call those County residents or real property owners within a two-mile radius of the site and County staff who have provided their names and contact information (phone number, email, or text) to Operator. Operator will maintain the notification list and individuals may add their names to the list at any time by contacting the scale house at the quarry facility. Wells and Water: ff) Monitoring Wells: Operator shall construct multiple perimeter monitoring wells at locations determined by an independent qualified professional (i.e., certified hydrologist or geologist) and approved by DHEC. A plan describing the procedures and timing of observance for the monitoring wells shall be developed by an independent qualified professional and approved by DHEC and to be followed by Operator. gg) Water Well Impacts: Upon submission of a formal complaint by an adjacent property, as acknowledged by DHEC, pursuant to the State Mine Permit, DHEC shall determine if any activity associated with Mining Operations has caused a well or wells on the adjacent property owner's land to become dry. If DHEC determines that Mining Operations have caused the drying of the property owner's well, Operator shall be responsible for providing an alternative water source (e.g., drill well deeper, new well, or connect to public water source at the discretion of Operator) for the aggrieved party at Operator's expense. Reclamation: hh) Plan and Bond: A copy of the DHEC approved mining reclamation plan shall be submitted to the county before approval and the applicant shall provide verification of a reclamation guarantee for the area of disturbance giving financial assurance in a form approved by Edgefield County and DHEC, guaranteeing the satisfactory reclamation 17 of all disturbed areas. The amount of reclamation for permanent commercial operations shall not be less than $1,000.00 per disturbed acre, with a $10,000.00 minimum and shall be adjusted upon the renewal of the operations plan to meet projected costs of reclamation based upon time, material and equipment needed to clean-up and remove structures, backfill, slopes shall be graded to no greater than a 3:1 finished slope or in relation to the contour of adjacent undisturbed land, contour, redistribute and stabilize topsoil, re- vegetate, monitor, and reseed if necessary. The release of the financial assurance and obligations for reclamation shall not be made until the county planner, and county attorney approves the release in writing. Community Interest: ii) Community Engagement Group: Immediately prior to the commencement of Mining Operations, Operator shall work with interested parties in the community to establish a Community Engagement Group (the “CEG”) comprised of representatives of homeowner associations or similar residential groups and interested individual property owners located within a two (2) mile radius of Mining Operations. Operator shall facilitate meetings with the CEG on a quarterly basis or as otherwise mutually determined by Operator and the CEG to allow for information exchanges with respect to historical Mining Operations, future plans for Mining Operations and other community issues or opportunities of concern or interest of the CEG and Operator. This condition is intended to provide a forum for communications among the CIEG and Operator and does not grant any approval rights to the CEG with respect to Mining Operations. jj) Dedication of Easement for Public Trail: Subject to and upon approval of a conditional use for mining activities and related uses on the Property and at commencement of mining activities on the Property, the Applicant shall offer for the dedication of an access easement over and across the length of the property line adjoining Stevens Creek (the “Potential Trail Dedication”) shown on the plan included in this application dated March 18, 2024 and entitled “General Development Plan” (the “GDP”) on commercially reasonable terms and conditions for a public use greenway/trail system. Memorandum To: Edgefield County Planning Commission From: April Morgan, Edgefield County Planner Date: April 18, 2024 Re: Land Development Application (ECLS Engineering Consultants & Land Surveying) Applicant: ECLS Engineering Consultants & Land Surveying Property Owner: Stanley Martin Homes Property Address: (or) Location: Eutaw Springs Trail Parcel ID: 099-01-05-044-000 Property Size: 0.67 Acres Land Use: Buffer/Green Space Zoning: RD Proposed Use: Residential Sewer/Septic: Sewer Water: County Water Land Development Description Stanley Martin has submitted Application for the development of a parcel of land located in the existing Mount Vintage Subdivision off of Eutaw Springs Road, parcel ID#099-01-05-044-000. Stanly Martin is proposing to place a single-family residential unit on this parcel. Price Point $400,000-$500,000 Compliance with County Land Development Ordinances • Permitted Use in Zoning District - Permitted • Minimum Lot area requirements in Zoning District - 0.50 Acres • Application process for Land Development - Completed Compliance with County Comprehensive Plan • Permitted Land Use -Compliant Approval by Other Regulatory Entities • DHEC Storm Water / Sediment Control -Pending • DHEC Waste Water Control -Pending • ECWSA Tap Approval -Pending • Electric Utility -Pending • SCDOT Encroachment -NA • Other Regulatory Entities -NA 19 Staff Analysis Upon review of the approved Subdivision plats of record in the Edgefield County RMS office, JR38150, and the preliminary plat presented, the parcel of land proposed for development is currently part of established/approved/ required Greenspace and Buffer area for one of the main entrances to Mount Vintage. Implementation of natural buffers and green-space, by design, are to provide a physical and visual barrier/space between properties, unlike uses, or traffic areas reducing noise, air and light pollution and promoting aesthetics. Impact on these things should be considered when making recommendation for approval, approval with condition, or denial. Planning Commission Action Following Public Hearing the Planning Commission may vote on Preliminary Plat approval for Mount Vintage Plantation. The proposal will receive automatic approval on June 9, 2024 if no decision is reached by that time unless both the applicant and the Planning Commission agree to an extension. As sighted in the Edgefield County Code of Ordinances Sec. 24-251 “In its deliberation, the planning commission shall approve, approve conditionally, or disapprove the plat. If the preliminary plat is disapproved or approved conditionally, the reasons for such action shall be conveyed to the applicant. The reasons for disapproval shall refer specifically to those parts of the comprehensive plan or ordinance or regulation with which the plat does not conform. On conditional approval, the commission may require the applicant to resubmit the preliminary plat with all recommended changes before approving the plat. If the preliminary plat is found to conform to all requirements of this chapter, approval shall be given by the planning commission and shall be noted in writing by the chairperson on at least two copies of the preliminary plat. One copy shall be retained by the planning administrator and one copy given to the applicant.” Final approval/ denial of the preliminary plat will be made by the Edgefield County Planning Director. 20 Land Development Area Aerial: (Image, Streets, Property red outline) Land Use: (Land Use name under picture) Zoning: (same as aerial with zoning) Green Space/ Buffer 21 JR-38150/ Original Approved Plat 22 Land Development Property (same as aerial but also addresses) 23 Land Development Preliminary Plan 24 Other Documents 25 Edgefield County PLANNING COMMISSION Meeting Agenda County Council Chambers May 9, 2024 6:00 PM VI. Call to Order A. Invocation B. Pledge VII. Approval of Agenda A. Approval of May 9, 2024 Meeting Agenda VIII. Approval of Minutes A. Approval of April 11, 2024 Work Session Meeting Minutes B. Approval of April 11, 2024 Meeting Minutes IX. Guest Speakers a) Representatives from Luck Companies, Katie Kosloski, Ben Thompson, and Susan Mitchell, will be present for questions. b) Representative from ECLS Global Inc. for questions regarding Mt Vintage Land Development Application. X. Reports Staff report on Minor, Major and Exempt Subdivisions for the month of April 2024 XI. Public Hearing a) Public Hearing regarding the Luck Companies proposed Mining Operation and Preliminary Plat. b) Public Hearing regarding the Land Development Application submitted by ECLS Global Inc., for the development of Greenspace/ Buffer area located in Mt Vintage Plantation Subdivision off of Eutaw Springs Trail, Parcel ID# 099-01-05-044-000. This agenda may be modified at any time prior to or during the meeting described herein. A vote may be held on all agenda items. The meeting may begin after the advertised start time if a reasonable adjustment to the advertised start time is needed for any reason 26 XII. Old Business No Old Business XIII. New Business a) Final discussion and vote to recommend approval, approval with conditions, or denial of the Luck Companies proposed Mining Operation and Preliminary Plat. b) Final discussion and vote to recommend approval, approval with conditions, or denial of the Land Development Application submitted by ECLS Global Inc., for the development of Greenspace/ Buffer area located in Mt Vintage Plantation Subdivision off of Eutaw Springs Trail, Parcel ID# 099-01-05-044-000. XIV. Executive Session No Executive Session XV. Comments by the Planning Commission Chair XVI. Adjourn To watch the Planning Commission Meeting live: Subscribe to our YouTube Account – Edgefield County Government. You can be notified of upcoming live streams. The next Planning Commission Meeting is scheduled for June 13, 2024. The Planning Commission is scheduled to meet on the second Thursday of each month at 5:00 p.m. for a work session and at 6:00 p.m. for the meeting at the Edgefield County Council Chambers located at 225 Jeter St., Edgefield, SC. These meetings are subject to prior cancelation or change. The public will be notified of any cancelation or change. Individuals requiring special assistance or a sign interpreter to participate in the meeting are asked to please notify the Building & Planning Department 48 hours prior to the meeting at (803) 637 - 4073. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Amorgan@edgefieldcounty.sc.gov 27 Edgefield County PLANNING COMMISSION Work Session Minutes County Council Chambers April 11, 2024 5:00 PM 28 The Edgefield County Planning Commission Work Session was held on Thursday April 11 th, 2024, at the Edgefield County Council Chambers at 225 Jeter Street in Edgefield at 5:00pm. Notice of the time date and agenda of this meeting was provided to The Edgefield Advertiser, placed on the Message Board outside Council Chambers, and provided to others when requested. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Amorgan@edgefieldcounty.sc.gov Members present: Fab Burt, Karleen Butler, Lisa Whitaker, Tracy Walsh, Members absent: Sharon Hadden, Staff present: April Morgan, Dharma Williams. Hart Clark David Caddell County Council members present: Guest Speakers: Representatives from Luck Companies, Katie Kosloski, Ben Thompson, and Susan Mitchell No votes held during work session. 29 I. Call to Order Burt called the meeting to order at 5:00 pm. II. Guest Speakers Katie Kosloski thanks commissioners for their time and explains that there are three representatives from Luck Companies who will answer questions. Ben Thompson introduces himself. He states that he has been with Luck Companies just shy of 20 years, prior to that he was a County Planner and he worked in the engineering firm as well. As a team they are at the forefront of the company as they grow and try to expand opportunities. They as a team have spent a lot of time around the State for many years. He encourages the commissioners to ask any questions they may have as this meeting is an open discussion so that they can gain feedback. Susan Mitchell introduces herself as the Community Engagement Manager and having been with Luck Companies almost a year. She previously was with marketing and communication and community outreach working on various projects, most recently being the US Forestry. She states she also recently worked with wastewater, stormwater, drinking water programs and getting them out to the public along with nonprofit work. She explains that her background is as a historian and that she loves the Edgefield Community. Katie Kosloski introduces herself and her relationship with Luck, which has been about 15 years including internships. She explains that she has a background in Engineering and has spent time in the engineering department and project management grounds, she took interest in the field and took a management trainee roll in the field for about six years working in different operations in the quarries across the East Coast. She continues that she became the first female manager for Luck Stone and was running the Atlanta operation is one that employees the most associates. She explains that now she gets to use her background to look for new opportunities for the company to spread their mission and create employment opportunities for people in the Southeast. Clark and Morgan put a PowerPoint presentation on the screen, and Kosloski explains that although it is a presentation she wants for this meeting with the Planning Commission to be more of a discussion and invites them to ask questions. She explains that they like to introduce themselves and their backgrounds because they believe it is important to introduce themselves and the organization and what they stand for. Kosloski explains that Luck Companies itself was founded 101 years ago and that entire time they have been family owned and operated by the Luck family. The Luck family is in the office on a daily basis and they have been engaged for three, almost four, generations. The thing that has been consistent throughout 30 the organizations is the commitment to people. The foundation of the business is to create critical infrastructure materials, but the purpose is the people that we work with and doing good to do well, and feeling as if we have a responsibility as a community member to be active and engaged. In addition to the people culture, we have a set of core values that come out in every meeting to help make decisions on a daily basis. Luck Companies is the parent organization and there are several different business units that comprise Luck Companies which all have a focus on critical infrastructure materials but they each have a little bit of a different purpose. The oldest business and the one you will hear most about is Luck Stone, which was how to organization was started all those years ago. They are focused on construction aggregate materials, which are the materials that are mined from the earth for the purpose of concrete, asphalt, and drainage rock. This supports our roads, schools, hospitals, anything that is built has to have a foundation of stone. The mining industry as a whole is highly regulated. I pride myself for working for an organization that sets the standard so not only do we meet those expectation set by local, federal, and state agencies but we set a lot of our standard operating procedures at half. Blasting limits are half of those limits, our noise, etc. A lot of this has to do with the pride for our organization and the folks in the community. The next two organizations speak more towards our value of creativity and stemmed out of some of the creativity. Luck ecosystems was formed from the need of generally when you mine rock there is dirt or “overburden” which generally sits in a pile with not a lot of use, but a team decided there had to have been something more to do with it. At the same time there was a need in the construction industry for some environmental sensitive materials that can help when you put in a parking lot and have run off it can filter out some of the toxins that are being picked up from pavement. That group is solely focused on creating these environmental products. They take overburden and mix them with the materials. They also have a sports mix that can be found on little league fields, one or two major league fields, and a lot of small community fields. We also make golf course sand. The last business unit is the Real Estate Group. There is a lot of land surrounding and buffering Luck Stone project. The goal was to create the highest and best use to create more jobs and tax revenues that did not put a strain on the local infrastructure. Their job is to work with those local municipalities, and we are hopeful to have some sort of economic development. Along with our values there was a huge interest from other people both in the mining industry and other industries on leading with those values. We call it values based leadership. Our founder was really interested in being able to take that and deploy it to other folks so we have a nonprofit called inner will and the entire focus is to help companies and people establish core values and they take that on the road with a leadership team. The Luck Family Foundation is a huge passion for being a part and supporting communities and the Luck Family has found a way to do this through grants. They also match donations with all the associates so if a donation is made to a nonprofit the foundation will match it dollar for dollar up to a certain amount. We hope to bring all of these businesses to Edgefield County at some point but the first will be Luck Stone. Whitaker asks why Edgefield County was chosen. Thompson states that he will explain that during his presentation. 31 Thompson explains that since the great recession there has been a lot of consolidation with the Construction Material industry. He continues that they had two avenues, one being mission and vision of the company which is very sincere and very real and the way it is done is the more touch points that they have are more that they can extend positive impact, so growth is very important for that reason. Growth is also very important because there is a statistic that 94% of the company associates are all in continuing education. He explains that every company has annual assessments and Luck Companies are a lot more regular than that but about half of the conversation is about technically how you have grown and what is your experience, and the other half is about what you have done in the community and how you have expanded your education. This means that the opportunities that get created just as employees gain greater scale is very important to the company. On that consolidation of industries, Luck Companies is the largest family owned and operated company in this space however most comparators are large public companies, so with consolidation everything that Luck is doing is supporting customers and the company wants to spread to support more customers as they consolidate and grow as well. Thompson continues to explain that a lot of time was spent looking at the culture of the business and existing cultures and found the Southeast was more focused in a heavy relationship way. He continues that the more time spent in South Carolina, they believe it is a good fit for them. Initially, a small operation just north of Camden was established which gave the company more familiarity in South Carolina, and that site did well due to business communication. This proved to the company that they made the right decisions with coming to South Carolina. Since then, there has been a site permitted in Spartanburg County, Fairfield County, Chester County, and looking at the footprint's desire, Edgefield County was a good focus. Thompson shares that they believe the environment of Edgefield County felt like a good fit for Luck Companies with its characteristics as well as location between Aiken and Augusta and growth of the state and the support of infrastructure upgrades. Thompson explains when looking they considered the plans of Edgefield County and explains that it seems like the County is very interested in respecting and retaining the rural characteristics and being purposeful of where growth should be, which are items that Luck Companies likes to see in a county’s plans as it shows they are looking at “Smart Growth”. Thompson explains that they have been silently looking at site in Edgefield County for roughly two years as their company has a due diligence to find a site that works by looking at items like land use of the surrounding properties, the road infrastructures and also the parameters that meet the respect and environmental ethics and what has to be in the rock specifically. Once this property was found in Edgefield on, there were many studies and tests that had to be completed. The property is off Woodlawn Road about four and a half miles west of Sportsman’s Corner, bordering the McCormick County line, about a mile and a half east of Highway 28. This is an exceptionally rural portion of the County but has good roadways that conversations with the SCDOT can be made about the roads. Burt asks if the area has already been cored, Thompson replies it has been cored somewhere between 12-16 different holes which will be sent off to a lab for studies to see if it meets the DOT standards. He explains this is one of the 32 many tests and studies that will be done on the property as this industry is a very regulated industry that has many reviews and comments made during the industry. He continues that if things continue in a positive fashion it will be roughly an entire year of getting permits settled. Whitaker asks the general duration of a project like this. Kosloski responds that it somewhere north of 70 years depending on the demand of the material. She explains that in the 100-year history of the company there have only been two retired quarries, one of which will be used as water storage for the County, and another is being used as overburden storage. Walsh asks what was found in this specific quarry. Thompson explains it is a granite material that can be used as a base for roads, foundations for houses and the primary customers will be local concrete and asphalt companies. Walsh explains that her and her children were able to tour a quarry in Columbia and she had learnt that they developed a type of cubical piece concrete was created with to make drainage easier. She asks if this is something specially patented with only that quarry or if it is something that could be seen with Luck Stone. Kosloski explains that Luck Stone does make that, it is called manufactured sand because it mimics the shape of natural sand. She explains that natural sand has a limited reserve in the United States especially in the Southeast, so this is a supplement as a component of concrete. She continues to explain that Luck Stone makes the same products as their competitors because the DOT has certain the gradation or the mixture of rock sizes that they will accept. Whitaker asks how many careers will be available. Thompson explains that queries are not large employers, so when starting there will be roughly 15-20 employees. He continues to explain that Luck Stone chooses not to use their own trucking company because there is more control on the trucks if they are contracted, but also because there are already existing people in this market that the company does not want to displace but they rather hire them. That is typically 50-75 employees. As the sites progress in volume more people need to be added but will probably be capped around 25 associates. Kosloski explains that these jobs do not require any experience, but all the training is in-house. The classes for continuing education hosted on site can teach them things such as how to weld, how to change a crusher, accounting and business, etc depending on what the employee is interested in. Luck Stones also likes to collaborate with local technical colleges. Thompson continues to explain that the piece of property being discussed is in total around 1,700 acres, but Luck Stone is talking about 420 acres of that. He shows a drawing of the area and explains the site plan of what each area will be used for. He explains that the 50-acre pit probably takes about 50 years to do. He further explains that it will start very small with a portable office as it takes off, and years later there will be an entrance and the company have high expectations for themselves regarding the aesthetics of the company. He invites the commissioners to look at one of their sites to see what it would look like. Thompson explains the process of what it would look like as trucks enter, get weighed, and exit. He states that 60% of the site will be open space and that they consider what the property will be used for after it is finished, and they take this into consideration when deciding where to put material. On the North 33 side of the property there will be a trail that runs along Stevens Creek as many of their sites have trails and overlooks surrounding them for community to use. One of the trails for the National Forrest is close and the idea is for the two trails to connect. Thompson explains that this conversation has already begun with Forestry. Burt asks if the property is under contract. Thompson explains it is under contract but has not yet been purchased. Kosloski explains that the zoning ordinances have conditional uses for mining and quarrying and it has several different design criteria in which have to be met. Luck Stone is hopeful to meet and exceed that criterion, they have offered 36 operational conditions relating to aesthetics, dust, noise, community impact teams, community interest such as the trails, etc. to gain the trust of the community and meet or exceed the requirements of the county. Kosloski explains that if Luck Stone is found to not be complying the County could remove their right to mine and she hopes this will establish a level of trust with the community that they will hold themselves accountable. Kosloski refers to a document that shows what the County requires vs what Luck Companies will do to meet these standards. Clark explains that he did have a concern with Woodlawn Road because of the large trucks making sharp turns. He explains that they have already passed their DOT traffic study but that he has asked them to consider an improvement of the intersection to help prevent the deterioration of Woodlawn Road and they agreed to investigate, and they were more than happy to jump onto the request. Clark encourages the commissioners to also point out concerns. Butler agrees with Clark about the road as she lives across a quarry currently and is aware of how the dump trucks can cause issues to the roads to where her car tires deteriorate quickly. She asks about if there are many homes near where the quarry would be. There is discussion of a few houses across the street and towards Sportsmans Corner the residences begin to pick up again along with a subdivision. Kosloski explains that they are hopeful to sit down with the residents of the area and if they express any concerns, they will look into them as well. Burt and Clark discuss where they think traffic would flow and express concerns on the shoulders of those roads and that he hopes that this will not be another Sweetwater Road. Thompson explains that the average amount of trucks will be 8 trucks an hour and that he would say that a part of that DOT traffic study is doing the analysis and the only area where improvement may be necessary is around the entrance. Clark explains that he will put a link on the website with this traffic study. The trip generation shows 278 trips per day with the majority between 11-2, not early in the morning or late in the afternoon. At full development it would move up to about 400 trips per day, which is not a huge traffic impact although they are large trucks. Walsh asks if the DOT requires turn lanes, Thompson explains no, but they need some shoulder and drainage work. Walsh asks if they allow field trips to the other sites. Kosloski explains that they provided rock kits to schools for learning and that they do allow field trips. Walsh explains that taking her children for a homeschool trip where they had 34 lunch, and a presentation was a wonderful experience. Thompson explains that they have a yearly dinosaur walk for the students and there is a foundation where one of the pillars is youth foundation. Mitchell reminds commissioners that Luck Companies is a very family-based company, and they treat one another as well as the communities as if they are family. In the organization they have something called We Care, and it is a slogan worn on shirts during volunteer work with schools, food banks, etc. It is an ongoing mindset with the company. She explains that they are incredibly involved in business development. She gives an example in Fairfield County where the director of the Chamber of Commerce tells new business owners that every entrance and the way every company should behave should be the same as Luck Stone. She explains that she had individuals who did not want the quarry at first are now glad the quarry is there. They sponsor events in communities. The pillars they have are education, environment, and community and each pillar is established when they enter a community, and they create relationships in the community. She explains that she is looking for ideas to add to the list of relationships. Thompson explains that he believes it says a lot that it is the sole purpose of an entire department to build this relationship with the community. Mitchell continues that they wish to help with long term visions for the County and gives an example of the along with other committees and company's they have partaken in a river restoration project at Chesapeake Bay and oysters' population has returned due to Luck Companies contribution. She also gives an example of a statue of secretariat (a racehorse) being built for a major attraction near their home, and Luck Companies was asked to recreate the composition of the three racetracks that he ran out to build the foundation for this presentation. Walsh explains that there are not any recreation centers in Edgefield for the kids and that she believes that if they had somebody to help partner with a YMCA or other organization for the children. Walsh asks what impact the blasts have on individuals who live nearby and if they are warned beforehand. Kosloski explains there is a pre-blast survey that will be completed and provided to homeowners, DHEC and Luck Stone. When there is a first blast, there will be a posting in the paper and an opportunity to sign up for text notices. She explains if they feel anything it will feel like a light grumble, and they have seismographs to keep these blasts on record. The sound, if there is any, will sound like thunder. If there is a low cloud cover it will have sound of thunder. It is less than a second long and will be somewhere between 1.5-2 times a month once it has started. Mitchell explains there will be a public meeting for the community and the blaster will be present to ask questions. III. Old Business No old Business was discussed IV. New Business No New Business was discussed V. Adjourn 35 Whitaker motion to adjourn, butler second. All voted in favor (4-0) Burt put the work Session to Adjourn at 6:00 pm. 36 Edgefield County PLANNING COMMISSION Meeting Minutes County Council Chambers April 11, 2024 6:00 PM The Edgefield County Planning Commission Meeting was held on Thursday April 11, 2024 in the Edgefield County Council Chambers at 225 Jeter Street in Edgefield at 6:00pm. Notice of the time date and agenda of this meeting was provided to The Edgefield Advertiser, posted on the message board outside of Council Chambers, and provided to others when requested. Any questions regarding the Planning Commission should be directed to the County’s Planner April Morgan Aprilmorgan@edgefieldcounty.sc.gov Members present: Fab Burt-Chairman. V, Karlene Butler-Dist. IV, Lisa Whitaker-Dist. III, Tracy Walsh-At Large Members absent: Sharron Hadden Dist. V Staff present: April Morgan-Planner, Dharma Williams-Planning Staff Hart Clark-Planning Director David Caddell County Council members present: Guests Speakers: No Guest Speakers 1 VI. Call to Order Chairman Fab Burt called the meeting to order at 6:00 pm. a. Invocation Whitaker gave an invocation. b. Pledge Burt led the pledge of allegiance. VII. Approval of Agenda a. Approval of April 11 ,2024 Meeting Agenda Walsh made a motion to approve the April 11,2024 agenda. Butler seconded the motion. Burt put the motion to a vote. All present voted in favor (4-0). Motion passed. VIII. Approval of Minutes a. Approval of March 14,2024 Work Session Meeting Minutes Whitaker made a motion to approve the March 14,2024 Work Session Meeting minutes. Butler seconded the motion. Burt put the motion to a vote. All voted in favor (4-0). Motion Passed. b. Approval of March 14,2024 Meeting Minutes Whitaker made a motion to approve the March 14 ,2024 Meeting minutes. Butler seconded the motion. Burt put the motion to a vote. All voted in favor (4-0). Motion Passed. IX. Guest Speakers No Guest Speakers X. Public Hearing No Public Hearing XI. Reports Morgan gives a report on approval of land development and minor and exempt subdivisions. There were six plat reviews, one land development application for the RV and Boat storage was approved. XII. Old Business No Old Business XIII. New Business No New Business XIV. Executive Session No Executive Session 2 XV. Comments by the Planning Commission Chair No comments made XVI. Adjourn Whitaker made a motion to adjourn. Walsh seconded the motion. Burt put the motion to a vote. All voted in favor (4-0). Motion passed. The meeting adjourned at 6:08 pm.

Source: Edgefield County website. First collected Oct 17, 2026.