County Council Workshop — Agenda Packet

Georgetown County · Georgetown County · General · meeting of Aug 26, 2025 · Agenda packets

Open the original document More from Georgetown County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

District 1: Clint A. Elliott, Chairman District 2: Bob Anderson District 3: Rev. Ernie Cooper District 4: Ron J. Charlton District 5: Raymond L. Newton District 6: Stella Mercado, Vice Chair District 7: Louis R. Morant County Administrator Angela Christian Clerk to Council Alma D. Sierra County Attorney John D. Watson August 26, 2025 3:45 PM GEORGETOWN COUNTY COUNCIL County Council Chambers 129 Screven Street, Suite 213 Georgetown, SC 29440 Agenda 1. CALL TO ORDER 2. REPORTS / PRESENTATIONS 2a Boards and Commissions Update 2b Solid Waste Management Plan 2c Stormwater Design Manual 2d Road Design Manual 2e Beach Management Plan Update 2f Miscellaneous 3. ADJOURNMENT [MEET_FOOT] Page 1 of 229 STATE OF SOUTH CAROLINA ) COUNTY OF GEORGETOWN ) ORDINANCE NO. 25- AN ORDNANCE TO DISESTABLISH VARIOUS COUNTY COUNCIL-APPOINTED BOARDS AND COMMISSIONS AND TO ASSIGN FUNCTIONS AND DUTIES TO COUNTY DEPARTMENTS AND SHERIFF’S OFFICE WHEREAS, all counties of the State have authority to enact regulations, resolutions, and ordinances respecting any subject as appears to them necessary and proper for the security, general welfare, and convenience of the county, or for preserving health, peace, order, and good government in the county; and, WHEREAS, the County is authorized to establish and disestablish such boards and commissions in the county as may be necessary and proper to provide services of local concern for public purposes, to prescribe the functions thereof and to regulate, modify, merge, or abolish the same; and WHEREAS, the powers of a county must be liberally construed in favor of the county and the specific mention of particular powers may not be construed as limiting in any manner the general powers of counties; and WHEREAS, the County is authorized, pursuant to Sec 2-85(b), Disestablishment, of Ordnance 2008-25 to disestablish, not in conflict with federal or state laws, any county council- appointed board or commission and assign its functions and duties directly under the governing authority and administration of the Georgetown County Council; and, WHEREAS, Georgetown County Council after due deliberation and consideration has determined it is in the best interest of the people of Georgetown County and the efficient and good operation of government of Georgetown County to disestablish several boards and commissions. NOW, THEREFORE, BE IT ORDAINED AND DECREED by the Georgetown County Council, the governing body of Georgetown County, that: Pursuant to Ordnance 2008-25, Sec 2-85(b), Disestablishment, the following Boards and Commission are hereby dissolved and disestablished, effective December 31, 2025: • Airport Commission • Fire District 1 Board • Historical Commission • Midway Fire Rescue Board • Parks & Recreation Commission • Sheriff’s Advisory Board Page 2 of 229 The functions of the respective Boards and Commissions shall be performed by the Departments which the Board or Commission served, and shall be under the supervision of the respective Department Directors, who are hereby authorized to carry out such functions, subject to and answerable to the County Council, or County Administrator, as may be directed. As regards the Sheriff Advisory Board, the Sheriff, being an elected official established under the laws of the State of South Carolina and a separate and distinct Office from the County, shall delegate, direct and provide oversight for the functions previously served by the Sheriff Advisory Board as the Sheriff may deem proper and necessary, in his discretion. DONE IN REGULAR MEETING THIS ____ DAY OF SEPTEMBER, 2025. _______________________________(Seal) Clint Elliott, Chairman Georgetown County Council ATTEST: _____________________________ (Seal) Theresa E. Floyd, Clerk to Council This Ordinance, No. 25-_________, has been reviewed by me and is hereby approved as to form and legality. ______________________________ (Seal) John D. Watson III Georgetown County Attorney First Reading: Second Reading: Third Reading: Page 3 of 229 Executive Summary Georgetown County Solid Waste Management Plan (SWMP) – Revised 2025 Georgetown County has updated its Solid Waste Management Plan (SWMP) to align with current local conditions, state regulations, and long-term goals for sustainable solid waste management. This revision ensures consistency with South Carolina's Solid Waste Policy and Management Act of 1991 and supports the County’s continued commitment to responsible environmental stewardship. Key Updates and Highlights:  Population and Waste Projections: As of 2025, Georgetown County's population is projected at 65,731, with an anticipated modest growth rate of approximately 1.9% annually. Despite only moderate population growth, waste generation has increased by more than 3% per year over the past decade— highlighting the need for effective solid waste planning and infrastructure.  Recycling and Diversion Progress: In FY2024, the County achieved a 40% recycling rate for municipal solid waste (MSW), surpassing the state target of 35%. However, per capita MSW generation remains at 5.55 lbs/day, above the statewide goal of 3.25 lbs/day. Continued public education and infrastructure upgrades will be crucial to achieving state targets.  Landfill Capacity and Expansion: Georgetown County relies on a Class Three Landfill for disposal of MSW, C&D waste, and sludge. As of June 2024, approximately 2.8 million cubic yards of permitted landfill capacity have been used and approximately 9.5 million cubic yards of permitted capacity remain. The permitted Class Three Landfill is expected to provide disposal capacity through 2080.  Facility and Program Improvements: The County is pursuing EPA SWIFR grant funding to modernize its outdated Material Page 4 of 229 Recovery Facility (MRF), originally constructed in 1994. An industrial shredder purchase is also under consideration to improve airspace conservation and enhance recycling of bulky items like mattresses and tires.  Financial Planning and Oversight: While the County does not yet have a 20-year capital plan for solid waste infrastructure, it continues to annually approve a budget supported by landfill fees, household service fees, and property taxes. FY2023 cost per capita was $9.45 for collection, $66.50 for disposal, and $29.42 for recycling.  Public Education and Outreach: The County is revitalizing its public education programs to encourage waste reduction and recycling. Efforts include landfill tours, school presentations, social media engagement, and collaboration with organizations such as Keep Georgetown Beautiful.  Goals, Strategies, and Barriers: The SWMP outlines strategies to meet state-mandated waste reduction and recycling targets, including infrastructure investment, expanded services, and intergovernmental coordination. Key challenges include limited funding, market volatility for recyclables, and rising disposal rates. Conclusion: The 2025 revision of the SWMP reflects Georgetown County’s proactive approach to long-term solid waste management. The plan emphasizes enhanced recycling, landfill capacity planning, infrastructure modernization, and public engagement to meet future needs. Continued evaluation and adaptation will be necessary to ensure alignment with evolving state requirements and environmental goals. Page 5 of 229 Page 6 of 229 STORMWATER DESIGN MANUAL FOR GEORGETOWN COUNTY, SC July 2025 Page 7 of 229 Table of Contents SECTION 1 GENERAL ........................................................................................................................................... 2 1.2 Introduction ........................................................................................................................................ 2 1.3 Purpose ............................................................................................................................................... 2 1.4 Applicability ........................................................................................................................................ 3 1.4.1 Redevelopment .................................................................................................................................. 4 1.5 Authority ............................................................................................................................................. 5 1.6 Updates ............................................................................................................................................... 6 1.7 Disclaimer ........................................................................................................................................... 6 SECTION 2 STORMWATER PERMITTING PROCEDURES ...................................................................................... 7 2.1 SCDES-OCRM Permit Requirements ................................................................................................... 7 2.2 Responsibility of the Applicant ........................................................................................................... 7 2.3 Categories of Operators ..................................................................................................................... 8 2.4 Application for Permit and C-SWPPP Review ..................................................................................... 8 2.4.1 Waivers ............................................................................................................................................. 10 2.5 C-SWPPP Approval ............................................................................................................................ 11 2.6 Start of Construction ........................................................................................................................ 12 2.7 SWPPP Availability (OS-SWPPP) ....................................................................................................... 12 2.7.1 Modifications .................................................................................................................................... 13 2.8 End of Construction .......................................................................................................................... 15 SECTION 3 C-SWPPP Contents ......................................................................................................................... 17 3.1 C-SWPPP Contents ............................................................................................................................ 17 3.2 C-SWPPP Specific Requirements ...................................................................................................... 22 3.2.1 Jurisdictional Waters and Critical Areas ........................................................................................... 23 3.2.2 Discharge to a TMDL Watershed or Impaired Waters ..................................................................... 23 3.2.3 Sediment and Erosion Control .......................................................................................................... 24 3.2.4 Special Protection Areas ................................................................................................................... 24 SECTION 4 DESIGN STANDARDS ....................................................................................................................... 26 4.1 Stormwater Management General Standards ................................................................................. 26 4.2 Stormwater Management Design Requirements ............................................................................. 26 4.2.1 General Requirements ...................................................................................................................... 28 4.2.2 Hydrologic/Hydraulic Design Requirements .................................................................................... 29 Page 8 of 229 4.3 Stormwater BMP Design Requirements ........................................................................................... 32 4.3.1 Detention / Retention Design Requirements ................................................................................... 32 4.3.2 Underground Detention Devices ...................................................................................................... 33 4.3.3 Infiltration BMP Requirements and Soil Testing .............................................................................. 34 4.3.4 Underground Exfiltration BMPs Requirements and Soil Testing ...................................................... 36 4.3.5 BMP Maintenance Plan .................................................................................................................... 38 4.4 Water Quality Requirements ............................................................................................................ 39 4.5 Downstream Analysis ....................................................................................................................... 39 4.6 Sediment and Erosion Control Requirements .................................................................................. 40 4.7 Vector Control .................................................................................................................................. 42 4.8 Easements......................................................................................................................................... 43 SECTION 5 STORM SEWER COLLECTION SYSTEM ............................................................................................. 45 5.1 General Design Criteria ..................................................................................................................... 45 5.2 Gutters .............................................................................................................................................. 45 5.3 Inlets ................................................................................................................................................. 45 5.4 Conveyance System .......................................................................................................................... 46 5.4.1 Stormwater Pipes ............................................................................................................................. 46 5.4.2 Open Channels .................................................................................................................................. 50 5.4.3 Outlet Protection .............................................................................................................................. 50 5.5 Culverts And Bridges ......................................................................................................................... 51 SECTION 6 INSPECTIONS ................................................................................................................................... 53 6.1 Permittee/Owner Construction Inspections .................................................................................... 53 6.2 Construction Maintenance ............................................................................................................... 55 6.3 County Inspection ............................................................................................................................. 56 SECTION 7 PERMANENT BMP MAINTENANCE ................................................................................................. 57 7.1 County Permanent Structure Maintenance Inspections .................................................................. 57 7.2 Owner Maintenance Inspections ..................................................................................................... 58 Page 9 of 229 APPENDICES APPENDIX A Georgetown County Stormwater Submittal Checklist APPENDIX B Georgetown County Fee Schedule APPENDIX C Georgetown County Close-Out Application Form APPENDIX D As-Built Certification Form APPENDIX E Georgetown County As-Built Survey Requirements APPENDIX F SCDES Notice of Intent (NOI) APPENDIX G Georgetown County Land Disturbance Application APPENDIX H Georgetown County BMP Maintenance Agreement Page 10 of 229 ACRONYMS AND ABBREVIATIONS ASTM – American Society for Testing and Materials BCM – Bureau of Coastal Management (formerly OCRM) BMP – Best Management Practice CEPSCI – Certified Erosion Prevention and Sediment Control Inspector CGP – Construction General Permit C-SWPPP – Comprehensive Stormwater Pollution Prevention Plan CZC – Coastal Zone Consistency EPA – Environmental Protection Agency EPSC – Erosion Prevention and Sediment Control HSG – Hydrologic Soil Group LCP – Larger Common Plan LID – Low Impact Development MTD – Manufactured Treatment Device NOI – Notice of Intent NOT – Notice of Termination NPDES – National Pollutant Discharge Elimination System NRCS – Natural Resources Conservation Service OCRM – Ocean and Coastal Resource Management OS-SWPPP – On-site Stormwater Pollution Prevention Plan PAM – Polyacrylamide SCDES – South Carolina Department of Environmental Services SCS – Soil Conservation Service SHWT – Seasonally High Water Table SMS4 – Small Municipal Separate Storm Sewer System TMDL – Total Maximum Daily Load USACOE – United States Army Corps of Engineers USGS – United States Geological Survey WLA – Waste Load Allocation Page 11 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 2 of 58 SECTION 1 GENERAL 1.1 Introduction Georgetown County (County) is an important coastal area that offers a wide range of employment opportunities, business and professional services, as well as historical, cultural, and recreational attractions. Georgetown County residents desire to maintain the character of their communities and sustain and improve the excellent quality of life that the area provides. Equally important to the residents of Georgetown County is the protection of the environment and the preservation of the unique aquatic ecosystem that help make Georgetown County a cherished coastal community. The Georgetown County Stormwater Design Manual ( Manual) defines minimum standards, requirements, and procedures for the design, permitting, construction, and maintenance of stormwater drainage systems within the jurisdiction of the County. As an integral part of the County’s stormwater program, this Manual applies to land disturbing activities by providing erosion prevention, sediment control, flood control, water quality improvement, and critical area protection. This Manual presents minimum stormwater standards that apply to physic al development and land disturbance within the C ounty. However, the minimum standards will not apply for all situations. Compliance with these standards does not relieve the applicant of the responsibility to use sound professional judgment or compliance w ith other local, state , or federal requirements. The County intends for these standards to assist, but not substitute for, competent work by qualified design professionals. 1.2 Purpose The County understands the importance of protecting the lands and waters from the effects of stormwater runoff. The Georgetown County Stormwater Management Program Ordinance (Ordinance) was enacted by the County to protect lands and waters from the effects of excessive soil erosion and sedimentation ; to prevent siltation of rivers, streams and lakes ; to prevent clogging of drainage channels; to prevent excessive flood damage; to prevent adverse impacts to the property of adjacent landowners ; and to reduce pollutants in stormwater runoff from new development and redevelopment. The Georgetown County Stormwater Management Program (Program) operates to meet current and anticipated needs of the County . The Department of Public Services , through the Stormwater Management Program, administers stormwater services for the protection of public and private properties, rivers, estuaries, and other water bodies from the potential damage resulting from uncontrolled stormwater releases and non -point source pollution. The purposes of the Program and this Manual are as follows: 1. Protect human life and health. 2. Improve the quality of stormwater runoff discharge to surface waters and groundwater. 3. Minimize upstream and downstream private and public property damage resulting from erosion, sedimentation, and flooding. Page 12 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 3 of 58 4. Prevent new development and redevel opment from creating a demand for public investment in flood control and water quality improvements works. 5. Provide an effective stormwater management system that will not result in excessive public or private monies being used for maintenance and replacement of existing portions of the stormwater system. 6. Facilitate the design of drainage systems that are consistent with good engineering practice and design and in accordance with the County’s overall planning efforts and stormwater management planning. 7. Provide a mechanism that allows development with minimum adverse effects to the natural environment. 8. Encourage preservation of the natural drainage systems in an aesthetically pleasing condition to the maximum extent practicable. 9. Ensure County compliance with all applicable federal and state regulations. 1.3 Applicability The standards in this Manual apply to new development and redevelopment projects within Georgetown County . New development and redevelopment projects require a comprehensive stormwater pollution prevention plan (C-SWPPP) for submittal by the applicant and approval by the County to obtain a Land Disturbance Permit (permit) . For the purposes of this Manual, a C -SWPPP represents the collection of documents required by the County to apply for a Land Disturbance Permit, as is detailed in Section 3. The County has the responsibility for review of: 1. All projects that result in land disturbance of equal to or greater than one (1) acre. 2. All projects that result in disturbance of less than one (1) acre of total land area that is part of a Larger Common Plan (LCP) of development or sale. 3. Any land disturbance greater than one-half (1/2) acre and within one-half (1/2) mile of a coastal receiving water body (but not for single-family homes which are not part of a subdivision). Parcels that have been divided and platted with the intent of residential or other development, shall not be considered to be separate land disturbing activ ities and shall not require individual land disturbance permits. Instead, the developmen t as a whole shall be considered to be a single land disturbing activity and shall comply with the requirements in this Manual . Hydrologic parameters that reflect the built-out development shall be used in all engineering calculations. If individual lots or sections in a residential subdivision are being developed by different property owners, all land disturbing activities related to the residential subdivision shall be covered by the approved permit for the residential subdivision. Individual lot owners or developers must sign the individual Lot Notice of Intent (SCDES Form 0432) to confirm all activities on that lot will be carried out in accordance with the approv ed permit for the residential subdivision . Failure to provide this form will result in individual lot owners being required to develop a C -SWPPP meeting the requirements of the Ordinance and this Manual for each individual lot. If new lots are being propo sed for development in an established residential neighborhoo d and the original approved plans or permits cannot be located that show how runoff from these lots is to be Page 13 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 4 of 58 managed, the ability of the existing stormwater system to accommodate the increase in runoff from these areas must be shown, or the runoff must be managed on site. Use of the existing stormwater system must show that the system would be able to accommodate the increase in runoff associated with the proposed lots and still meet the requirements of this Manual and the Ordinance. Subdivisions in which each lot is to have a minimum acreage of 5 acres and which do not need roads or utilities installed, can apply for a Certificate of Compliance if one of the two conditions listed below are met:  Each lot within one-half (1/2) mile of a coastal receiving waterbody will disturb no more than one-half (1/2) acres; or  Each lot more than one -half mile from a coastal receiving waterbody will disturb no more than one (1) acres. Lots should also have a 15’ undisturbed or vegetative buffer around the property line except for at the driveway. A separate Certificate of Compliance should be submitted for each lot. If lots are further subdivided in a future subdivision plat, a full land disturbance application that meets the requirements of the Design Manual will be required at that time. 1.3.1 Redevelopment Redevelopment shall generally include changes or improvements to any property that has previously been developed which results in the addition or modification to the existing property, irrespective of the condition of the existing surface upon which the redevelopment is performed. This may include but is not limited to changing of land characteristics as a result of demolition and reconstruction, structural additions, paving, and re-grading of the existing property. Redevelopment projects shall be evaluated for the following: 1. If the project site has an existing stormwater conveyance system that is serviceable and operational, perform an evaluation of the system in the redeveloped condition to determine if it is capable of conveying the redevelopment flows in accordance with the Manual for the following: A. If the existing stormwater conveyance system is capable of handling the redevelopment flows and meeting the peak discharge requirements in accordance with this Manual , then water quality treatment is required for only the redeveloped area (any area modified from the existing condition) as indicated in this Manual. A downstream analysis is also required in accordance with Section 4.5 of this Manual . If the project connects to a public system, the downstream analysis must show that the redevelopment project will not have an adverse impact on the public system capacity. B. If the existing stormwater conveyance system is not capable of handling the redevelopment flows in accordance with this Manual , then all standards of the Manual apply for the entire site. Pre-development conditions shall be evaluated as open space, fair condition for the onsite soil type(s) for the project site. If the project connects to a public system, a downstream analysis must show that the redevelopment project will not have an adverse impact on the public system capacity. 2. If the site intended for redevelopment does not have an existing stormwater conveyance system, no detention or retention, or no water quality treatment, then perform the following: Page 14 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 5 of 58 A. If the redevelopment project area is less than fifty ( 50) percent of the existing developed condition area and includes the addition of impervious area, then all standards of this Manual apply to the additional impervious area. B. If the redevelopment project area equals or exceeds fifty (50) percent of the existing developed condition area, then all standards of th is Manual apply for the entire redevelopment project area. Pre-development conditions shall be evaluated as open space, fair condition for the onsite soil type(s) for the project site. The County shall review all C-SWPPP submittals for general compliance with these specif ic standards. An acceptance by the County does not relieve the applicant from the responsibility of ensuring all systems are safe; that calculations, plans, specifications, construction, and record drawings comply with normal engineering standards; the req uirements of this Manual; and other applicable local, state, and federal rules and regulations. The functionality and compliance of the site and its infrastructure is the sole responsibility of the design engineer of record. Where any other law, ordinance, resolution, rule, or regulation of any kind also encompass the requirements included in this document, the more restrictive shall govern. The County Stormwater Manager may require more stringent requirements than would normally be required under these st andards depending on special protection areas, existing flooding concerns, and/or environmental constraints. The Stormwater Manager has the option of accepting alternatives to the plans, specifications , and design details of this Manual if the alternatives proposed meet or exceed the adopted performance standards. 1.4 Authority The Clean Water Act of 1972 (CWA), as amended in 1987, prohibits the discharge of pollutants into waters of the United States unless the discharge complies with a National Pollutant Dis charge Elimination System (NPDES) permit. The County is subject to the Phase II Stormwater NPDES permitting requirements and was issued a NPDES General Permit for Storm Water Discharges from Regulated Small Municipal Separate Storm Sewer System (SMS4) coverage by the South Carolina Department of Health and Environmental Control (SC DES). The Federal and state NPDES permit program requires the County “develop, implement, and enforce a program to address stormwater runoff from new development and redevelop ment projects that discharge into the regulated SMS4.” Within this regulatory context, the County implements development requirements that reduce water pollution carried in stormwater runoff. Laws that provide the County with the authority to regulate stormwater drainage within the County’s jurisdiction include, but are not limited to the following: 1. Constitutional authority as a municipal corporation to promulgate regulations governing the discharge of stormwater. 2. Section 48-14-10 et seq. of the Code of Laws of South Carolina, 1976, amended. 3. The Stormwater Management Program Ordinance; Ordinance 2014-44. Page 15 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 6 of 58 1.5 Updates This Manual is intended to be a dynamic document. As design technology an d criteria evolve, the Manual may and/or will require update s, modifications, and improvements. As updates are made, they will be available for download from the County’s website. It will be each user’s responsibility to maintain a current edition of the Stormwater Design Manual. The website format will allow the user to easily obtain or update new Manual information. 1.6 Disclaimer This Manual is established to provide Georgetown County Department of Public Services Director; County Stormwater Manager, or their duly appointed representative; property owners; develop ers; engineers; surveyors; and builders a better understanding of acceptable engineering methods to meet the intent of the County’s Stormwater Management Program Ordinance . Design of stormwater management for development and redevelopment requires the experienced judgment of the designer. The County accepts no responsibility for any loss, damage, or injury as a result of the use of this Manual. The application of this Manual, the Stormwater Management Program Ordinance, and the provisions expressed herein are the minimum stormwater management requirements and shall not be deemed a limitation or repeal of any other powers granted by statute. In addition, if site characteristics indicate that complying with the County’s minimum stormwater management requireme nts will not provide adequate design or protection for local property or residents, the County, as part of the review process, will require the Permittee to exceed the minimum stormwater management practices, control techniques, design and engineering methods, and such other programs and controls as are required to comply with the County’s NPDES permit. Page 16 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 7 of 58 SECTION 2 STORMWATER PERMITTING PROCEDURES This section provides developers, owners, engineers, contractors, and others with the information needed to ob tain a Georgetown County Land Disturbance Permit as required in accordance with Section 1.3 of this Manual. This section includes the process to receive a permit, comply with that permit during construction, and close -out procedures. Detailed information a bout the required C - SWPPP components and the design requirements are included in Sections 3 and 4 of this Manual. 2.1 SCDES-BCM Permit Requirements Unless otherwise exempt, all land disturbing activities disturbing one (1) or more acres of land, including sites smaller than one (1) acre that are part of a LCP of development ultimately disturbing one (1) or more acres, are required to o btain permit coverage for their stormwater discharges by submitting an approvable C-SWPPP to the County. A LCP is broadly defined by SCDES as any announcement or piece of documentation (including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning requires, computer design, etc.) or physical demarcation (including boundary signs, lot stakes, survey markings, etc.) indicating construction activities may occur on a specific plot . A common plan for development or sale identifies a site where multiple separate and distinct construction activities (areas of disturbance) are occ urring on contiguous areas. Such sites may have one operator or owner or several operators and owners. Construction activities may take place at different times on different schedules, in separate stages, in separate phases, in combination with other const ruction activities. Each Developer, Operator, or Owner for each site or project determined to be a part of a LCP is subject to permitting requirements of this Manual. Land disturbances less than one (1) acre, but greater than one-half (1/2) acre, which are located within one-half (1/2) mile of a coastal receiving water (Coastal Zone) are also required to obtain permit coverage for their stormwater discharges. Coastal receiving waters are defined in the Policies and Procedures of the South Carolina Coastal Zone Management Program as updated. Projects or developments located in the Coastal Zone that are not part of a LCP of development or sale, that disturb one -half (1/2) acre or less , and are located within one -half (1/2) mile of a coastal receiving water are automatically granted coverage under th e Construction General Permit SCR100000 provided the appropriate notifications are submitted and Best Management Practices are being used during construction activities. These construction activities require a Coastal Zone Consistency (CZC) determination, which is issued by SCDES’s Bureau of Coastal Management and must be submitted to the County. 2.2 Responsibility of the Applicant The applicant shall prepare a Comprehensive Stormwater Pollution Prevention Plan (C -SWPPP) in accordance with the requirements of this Manual herein and shall submit the plan to the County for review and approval. The applicant is responsible for providing sufficient infor mation to determine compliance with this Manual, the Ordinance, and SC DES Stormwater Regulations. The applicant is responsible for ensuring that the information presented is a true and factual representation of the existing conditions and proposed conditions after development. The applicant is also responsible for Page 17 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 8 of 58 ensuring that the activities and control measures specified in the C -SWPPP shall be constructed according to the approved plan. 2.3 Categories of Operators Each category of operator is specified by the operator ’s ownership, responsibilities and/or development of a construction site. These categories include Primary Permittees, Secondary Permittees and Contractors. Primary Permittees may include, but are not limited to a developer, landowner, real tor, builder, utility provider, public or private entity, etc. This person has the option of employing contractors to conduct land-disturbing activities under their general permit coverage. Primary Permittees may rely on, or require, Secondary Permittees a nd/or Contractors to assist with project activities necessary to ensure compliance with the Construction General Permit ( CGP) and implementation of the On-Site Stormwater Pollution Prevention Plan). The primary permittee is ultimately responsible for the site’s compliance with the approved C-SWPPP. Secondary Permittees are owners/builders seeking individual control of a portion or portions of a construction site, independent of the Primary Permittee, but still using the same C-SWPPP approved when initial coverage was granted. These Permittees are required to submit an Individual Lot Notice of Intent (SCDES Form 0432) to obtain their permit coverage before conducting any land-disturbing activities. Examples of Secondary Permittees are individual lot(s) owners within a residential subdivision. Contractors are operators that are employed by either the Primary or Secondary Permittee and have confirmed their understanding and promise to maintain compliance with the approved SWPPP by completing a Contractor Certification Form (SCDES Form 0437). 2.4 Application for Permit and C-SWPPP Review A pre-submittal meeting is required for every land disturbance activity within the County that requires a Land Disturbance Permit from the County Stormwater Department . The site owner and/or the person who will be responsible for the land disturbance should contact the Stormwater Manager via email at stormwater@gtcounty.org to request a pre-submittal meeting, and shall include the location of the site and the intended land disturbing activity in the email . The meeting will be at a time agreeable to all parties, and in most situations this meeting can be a virtual meeting. For larger areas of land disturbance, larger common plan s, sites with existing flooding concerns, or other sites with potentially complex submittals, a meeting on site may be requested . This meeting is intended to briefly review the submittal requirements, identify any known issues or problem areas near or downstream from the site, and discuss potential challenges at the identified site. The County will not provide any approvals during this meeting but can discuss the concept design and provide feedback. The person responsible for the land disturbing activity shall apply in writing to the County for a Land Disturbance Permit for such activity by submitting a C-SWPPP for review. The complete submittal package shall be sent in an email to stormwater@gtcounty.org. Each item shall be properly labeled and included as a separate attachment and identified it in the body of the email. As an option, large files can be submitted through a cloud based storage service such as Dropbox. This C-SWPPP shall Page 18 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 9 of 58 be complete as described in Section 3 and prepared in accordance with the provisions of this Manual and the Ordinance. For those proposed activities outside of the MS4 area, the applicant can submit the permit application for NPDES coverage to SC DES concurrently (contact SCDES for additional information on SCDES requirements for submission). Proposed activities inside the MS4 area will be discussed in more detail in Section 2.5. Specific requirements of the permit application and approval process are based upon the extent of the land disturbing activity , as discus sed in Section 1.3 . The person responsible for land disturbing activity shall also be required to obtain building permits and/or land disturbance permits prior to beginning construction. The permit application and approval procedures are as follows: 1. Upon receipt of a complete C-SWPPP per the requirements in this Manual , the C ounty shall conduct an initial review. ALL items from the Georgetown County Stormwater Submittal Checklist (Appendix A) are required or applicant shall provide an applicable explanation. Missing items on subsequent reviews may be allowed if the applicant provides confirmation that the item had been previously reviewed and approved by Stormwater Division Staff. Incomplete submittals shall not be reviewed . If an incomplete submittal is re ceived, the applicant will be notified and the items will be held for a period of 48 hours . Afterward, the items will be discarded, and the review fee returned. 2. When the land disturbing activity consists of the construction of a pond, lake or reservoir which is individually built and not part of a permitted land disturbing activity, a C-SWPPP will not be required if the pond, lake or reservoir is permitted under the state Dams and Reservoirs Safety Act (Regulation 72 -1 through 72-9) or has received a cer tificate of exemption under the state Dams and Reservoirs Safety Act. Best management practices shall be used to minimize the impact of erosion and sediment. 3. If, after review, the application for a land disturbance permit is denied, written notification indicating the reason or reasons for denial shall be forwarded to the applicant. The applicant may correct the deficiencies in conformance with this Manual and t he Ordinance and re -submit the application one additional time with no additional fee. 4. All re-submittals following the second re-submittal shall be subject to a re-review fee equal to the original fee for each re-submittal. This re-review fee shall only apply to those re -submittals that require changes to the design of the site; minor comments (i.e. u pdating a table for consistency, adding a detail to the plan set, etc) will not require a re -review fee. See Appendix B for more details. 5. If the revised a pplication is approved, the County shall issue the C -SWPPP approval (Section 2.5). 6. These requirements may be modified by the County on a case -by-case basis to address specific stormwater quantity or quality problems or to meet other regulatory requirements which are more stringent than the requirements of this Manual. 7. Any C-SWPPP approval shall be suspended, revoked, or modified by the County upon finding that the holder is not in compliance with this Manual, the Ordinance, or the approved C-SWPPP. Page 19 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 10 of 58 The C -SWPPP contains supporting calculations, reports, drawings, and sufficient information describing the manner, location, and type of measures in which stormwater runoff will be managed from the entire lan d disturbing activity . The County shall review the C -SWPPP to determine compliance with the requirements of th is Manual prior to approval . The approved C -SWPPP shall serve as the basis for water quantity and water quality control on all subsequent construction activities specific to the site. All C-SWPPPs submitted for approval shall contain a certification by the person responsible for the land disturbing activity (owner, developer, etc.) that the land disturbing activity shall be accomplished pursuant to the approved C -SWPPP and that responsible personnel will be assigned to the project. This certification is included in Section 1.6 of the SCDES SWPPP Template. All C-SWPPPs shall contain a certification by the person responsible for the land disturbing activity acknowledging the right of the County to conduct on-site inspections. All C-SWPPPs submitted to the County for approval shall be prepared, amended when necessary, certified, and stamped by a qualified designer. The following disciplines may certify and stamp/seal plans as allowed by their respective licensing act and regulations: 1. Registered professional engineers as described in S.C. Code 1976, § 40-22-10 et seq. 2. Registered landscape architects as described in S.C. Code 1976, § 40-28-10(a). 3. Tier B land surveyor as described in S.C. Code 1976, § 40-22-10 et seq. Pursuant to S.C. Code 1976, § 40 -22-280, C-SWPPPs may also be prepared by employees of the federal government and submitted by the person responsible for the land disturbing activity to the County for approval. The Ordinance does not prohibit other disciplines or certified professionals, including, but not limited to, certified professional erosion and sediment control specialists, which have appropriate background and experience from taking active roles in the preparation of the C -SWPPP and design process. All stormwater plans and specifications submitted to the County for approval shall be stamped/sealed by one of the qualified disciplines listed above. 2.4.1 Waivers The County may grant waivers from the requirements of this Manual for individual construction activities if there are exceptional circumstances applicable to the site such that stri ct adherence to these provisions shall not meet the intended purpose of the County’s Ordinance and this Manual. A standalone written request from the applicant shall contain descriptions, drawings, and any other information that is necessary to evaluate the proposed waiver. A separate written waiver request shall be required if there are subsequent additions, extensions, or modifications which would alter a previously approved waiver. Waivers are not available for water quality controls. A project may be eligible for a waiver of stormwater management for water quantity if the applicant can demonstrate that: 1. The proposed project shall have no significant adverse impact on the receiving natural Page 20 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 11 of 58 waterway or downstream properties; or 2. Attenuation of the runoff wi thin the subject basin shall alter the release rate such that downstream systems shall be adversely impacted by storing the regulated storm event (i.e. it can be shown that the time of concentration of the basins will coincide, leading to an increase of the peak at an already vulnerable point downstream). 3. The imposition of peak or volume control requirements of stormwater runoff would aggravate downstream flooding. An example of this situation would be when an overall watershed analysis has indicated that i mposing restrictions in the upstream watershed of the proposed project would cause the timing of the peak of the routed hydrograph to coincide with the peak flow from another contributing watershed at a certain point downstream. 2.5 C-SWPPP Approval Upon County approval of the permit application in areas within the MS4 area, the County will issue a Conditional Letter of Approval (CLA) to the applicant. The applicant shall send a copy of the County’s CLA, the County approved Notice of Intent (NOI), and the NPDES review fee to SCDES for NPDES CGP permit coverage. For those areas outside of the MS4 area, the applicant is encouraged to submit for SC DES approval concurrently with submission to the County. The land disturbing activity shall not begin until the applicant submits the SCDES issued NPDES permit to the County and the County delivers official approval and official stamped plans to the applicant. The County cannot approve C -SWPPPs and issue a Land Disturbance Permit until NPDES permit coverage i s received from SC DES. The C -SWPPP shall not be considered approved without an approval stamp signed and dated by an authorized person with the County . The County stamp of approval on the plans is solely an acknowledgement of satisfactory compliance with the requirements of this Manual and the Georgetown County Stormwater Management Ordinance. The approval stamp does not constitute a representation or warranty to the applicant or any other person concerning the safety, appropriateness, or effectiveness of any provision of or omission from the stormwater and sediment control plan. Upon approval of the submitted C-SWPPP and submission of SCDES approval where necessary, the County will issue a Letter of Approval , via e-mail, to the applicant and site ow ner, as listed on the County Land Disturbance Permit . The email will include information regarding next steps, which includes providing the County with three (3) hard copy sets of construction plans to be stamped by the County and directions to schedule a pre-construction meeting for the project. Approval by the County does not relieve applicants from responsibility for ensuring system performance, safety , and compliance with other local, state and federal regulations . Applicants must ensure that calculati ons, designs, specifications, construction, and record drawings comply with acceptable eng ineering standards and this Manual. County approval does not constitute a guarantee of system performance nor does it relieve the applicant of liability for the sufficiency, suitability, or performance of facilities. For projects regulated by other jurisdictions, applicants must comply with any additional or varying requirements and receive approval from those entities. Applicants are to provide proof of approval to the County as deemed necessary. Approved C-SWPPPs remain valid for five years from the date of approval . Extensions or renewals of C-SWPPP approvals may be granted by the County upon approval of an updated application by Page 21 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 12 of 58 the person responsible for the land disturbing activity. If changes to the original C -SWPPP are not required, only a completed NOI and the appropriate application fee are required. 2.6 Start of Construction The County requires that a pre-construction conference be performed on-site for all projects prior to the beginning of land disturbing activities to ensure all permittees and contractors performing the work know their responsibilities under the approved C-SWPPP. The applicant shall request an on- site pre-construction meeting on a date that is agreeable to County staff and all parties. The SWPPP Preparer will conduct the meeting with input from County Staff. The County will provide the applicant with the Land Disturbance Permit and Placard as well as the stamped set of approved plans at this meeting. At its discretion, the County may make inspector and site manager attendance at the pre-construction conference a requirement to receive the permit. The applicant shall notify the County at least three (3) business days prior to commencement of any land disturbing activity or construction under an approved C -SWPPP. All required building permits must be obtained. Notification shall be e-mailed to Stormwater@gtcounty.org. 2.7 SWPPP Availability (OS-SWPPP) The person(s) responsible for day-to-day operational control over implementation, shall have a copy of the On-site Stormwater Pollution Prevention Plan (OS-SWPPP) available at a central location on- site for the use of all those identified as having responsibilities under the OS-SWPPP whenever they are on the construction site. The OS-SWPPP shall be retained at the construction site from the date of commencement of construction activities to the date of final stabilization . If an on-site location is unavailable to store the OS -SWPPP, notice of the OS -SWPPPs location along with any updated contact information shall be posted at the construction site. OS -SWPPP locations shall be easily accessible (not more than a 15-minute drive away from the project site) and shall be accessible during normal business hou rs to SC DES, Environmental Protection Agency (EPA), local government officials, and the County for review. For linear construction of roads or utilities (such as utility construction including electrical power lines, gas lines, main sewer trunk line s, and water distribution lines) that are not part of a LCP of development, where it is not practical to have the OS -SWPPP on location, the Permittee and/or Operator shall, upon request, make the OS-SWPPP available by the end of normal business hours, or by the following business day under extenuating circumstances. OS-SWPPPs shall be made available upon request and at the time of a construction site inspection by the County. Updated copies of the approved OS -SWPPP shall be sent to the appropriate SC DES Environmental Quality Control (EQC) Regional Office in situations where it is not practical to have the approved OS-SWPPP on location. Electronic copies of third-party inspections shall be submitted to the County via e -mail to Stormwater@gtcounty.org on a weekly basis throughout the project . Failure to submit these inspections may result in a notice of violation or penalty. The OS-SWPPP includes: Page 22 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 13 of 58 1. All items required for the C -SWPPP except for the engineering calculations and engineering reports; 2. NOI (stamped and approved copy), copy of the CGP coverage letter from SC DES; this includes any individual lot NOIs (SCDES Form 0432) as required by Secondary Permittees; 3. Copy of local approvals (additional letters, approvals, or certifications necessary to implement the OS-SWPPP, when necessary); 4. Copy of United States Army Corps of Engineers ( USACOE) approvals (certifications to allow impacts to Waters of the State or Jurisdictional wetlands) when necessary; 5. Contractor certifications, (certifications necessary to allow contractors to conduct construction activities within the construction site); 6. Any logs necessary to track the progress, compliance, modifications and those associated with the construction site. These logs may include, but are not limite d to, a pre -construction conference log, an inspection log, a stabilization log, a rain log, a contractor log and/or any additional record keeping as deemed necessary by the County, Contractor, SCDES, SMS4 or an entity delegated under Regulation 72-300; 7. SCDES Construction General Permit SCR100000 (One copy, excluding the appendices. Provisions may be made for the copy of the general permit to be accessed electronically as long as a hard copy can be made available by the end of the working day when required); and 8. CZC Certification. 2.8 Modifications Each OS-SWPPP shall be modified if it is determined during inspections or investigations by the County, state, tribal or federal officials that the OS-SWPPP is ineffective in minimizing pollutants in stormwater discharges or controlling peak runoff rates from the construction site. Each OS-SWPPP shall be modified as necessary to include additional or modified BMPs, which are designed to correct problems identified during the construction site inspection by any qualified inspector, or by local, state, tribal or federal officials. Revisions to each OS-SWPPP shall be completed within seven (7) calendar days following the inspection. 1. Major Modifications - The C-SWPPP shall be modified and submitted for rev iew and receive approval by the County prior to implementation if any of the following conditions are met: A. Whenever there is a significant change in design, construction, operation, or maintenance at the construction site resulting in discharges that will cause, have the reasonable potential to cause, or contribute to violations to water quality standards. B. Whenever a change in the design, construction, operation, or maintenance calls for a revision of any approved C-SWPPP based on the following list of major modifications: i. Modifications that will affect the hydrology or trapping efficiency calculations including the following: Page 23 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 14 of 58 a. Resizing Sediment or Detention Basins that either reduces the stormwater volume capacity and/or is resized to handle increase/decreas e incoming peak flows or runoff volumes due to revised site development plans; b. Deletion of Sediment or Detention Basin or Sediment Trap; c. Relocation of Sediment or Detention Basins resulting in increases/decreases in receiving drainage area and/or resulting in a new/relocated basin outlet location, which is directed towards an outfall that was not approved within the C-SWPPP; d. Addition/Removal of Sediment or Detention Basin; e. Modification of Sediment or Detention Basin Outlet Structure; f. Changes in grading that alter drainage patterns that may result in increased or decreased flow to a Sediment or Detention Basin; and g. Amending Construction Sequence in a fashion that the Detention Basin is not installed before Grubbing Operations begin. ii. Point Discharge or Outfall location changes. iii. Any modification to regulated water quality structural control measures. iv. Adding a new point discharge. v. Addition of Impervious Area due to revised site development plans. vi. Addition of Disturbed Area. vii. Changes to Navigable Water Crossing. viii. Addition of Sediment Trap(s) when required to obtain 80% Trapping Efficiencies for disturbed areas not previously permitted or redirected away from an approved water quality BMP. ix. Site layout changes that require redesigning the stormwater management system. x. Any additional modifications as determined by the County. 2. Minor Modifications -The Permittee shall modify the OS -SWPPP and keep a record of each modification within the OS-SWPPP if any of the following conditions are met: A. Addition of BMPs - Addition of Silt Fence, Slope Drains, Inlet Protection, Outlet Protection that does not involve additional wetland impacts, or Check Dams to improve the overall stormwater management and sediment and erosion control at the construction site. B. BMP Relocations - Relocation of construction entrance, pond inlet pipes (within a pond), and any other proposed BMP to improve the overall stormwater management and sediment and erosion control at the construction site. C. Removal of Disturbed Areas - As long as the removal of the disturbed area does not also remove any BMPs required to meet Water Quality or Quantity Standards. Removal of disturbed area only qualifies for disturbed a rea that was included in the initial coverage approval and that was never disturbed (i.e., cleared, grubbed or graded). Page 24 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 15 of 58 D. Modifying Individual Lot Drainage - Unless the changes affect the inflow to a Detention Structure or Analysis Point, to which the lot drains, that was not previously approved. 2.9 End of Construction Upon project completion related to t he land disturbing activity, a Georgetown County Stormwater Project Close Out Package along with the SCDES Notice of Termination (NOT) is sent to the County Stormwater Division. For submission of a Project Close Out Package, one or more of the following conditions shall be met prior to issuance of a County Certificate of Occupancy: 1. Final stabilization has been achieved on all portions of the site for which the Permittee is responsible; 2. Another Operator has assumed control, according to §122.41(l )(3) of SC Regulation 61 -9, over all areas of the site that have not been finally stabilized; 3. Coverage under another County Land Disturbance Permit and a general NPDES permit has been obtained; 4. For residential construction only, permanent stabilization has been completed and the residence has been transferred to the homeowner; 5. Land disturbance activities were never initiated on the construction site and the construction site remains permanently stabilized. A full review of the close out package will be conducted. Once the project’s close out package is approved, a final inspection shall be conducted to review the project site for compliance with the approved C-SWPPP. The Georgetown County Stormwater Project Close Out Package includes: 1. The Georgetown County Close-Out Application Form (Appendix C) 2. The Georgetown County As-Built Certification Form (Appendix D) 3. Electronic and hard-copy as-builts that comply with the County’s As-Built Survey Requirements (Appendix E) The Georgetown County Project Close Out Package and SCDES NOT shall be signed by the Project’s Design Engineer and Permittee and submitted within thirty (30) days of one of the above conditions being met. The Georgetown County Project Close Out Package and SCDES NOT is not valid un til the County concurs an d notifies the Permittee of County acceptance of the Georgetown County Project Close Out Package and SCDES NOT. Upon County approval, the Permittee shall submit the NOT to SC DES. If a Georgetown County Project Close Out Pac kage and SC DES NOT has been submitted and the construction site does not meet the criteria for termination, then the construction site remains subject to the provisions of the C-SWPPP. If there are any permanent BMPs on the site, a revised maintenance agreement shall be submitted along with the Georgetown County Project Close Out Package and SC DES NOT, when the responsible party(ies) or individual(s) accepting ownership or maintenance of permanent stormwater control devices have changed from what w as originally approved. For infiltration BMPs and/or underground systems, the manufacturer’s representative or other qualified person must be present on- Page 25 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 16 of 58 site during installation and provide a letter to certify that the BMP was installed correctly and in compliance with manufacturer’s recommendations and the construction plans. For residential subdivisions, Primary Permittees do not need to terminate permit coverage in areas where Secondary Permittees have received permit coverage to perform work under th e permit. Primary Permittees can request to terminate coverage when Secondary Permittees are authorized to conduct construction activities, independent of the Primary Permittee, for the remaining disturbed areas on the construction site and final stabilization has been achieved on all other ar eas of the construction site. Page 26 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 17 of 58 SECTION 3 C-SWPPP Contents This Section provides detailed information on the documents and information required for submission for a complete C -SWPPP to obtain a Land Disturbance Permit in accordance with the Manual an d Ordinance. This is a comprehensive list and omission of any item shall require an explanation within the submittal. It is encouraged that the application use the SCDES C-SWPPP template as a basis with the additional documents as Appendices, to be sub mitted as stand -alone documents for review, as described in Section 2.4. 3.1 C-SWPPP Contents All C-SWPPPs shall contain the following information as applicable. 1. A fully completed Georgetown County Stormwater Submittal Checklist (Appendix A). 2. A fully completed SCDES Notice of Intent (NOI) form for a permit . SCDES’s NOI is provided in Appendix F. 3. Georgetown County Land Disturbance Application, signed (Appendix G). 4. C-SWPPP document body in a format in line with the SCDES template, to include; A. A project narrative that describes the scope of the project, including detailed pre - and post- development conditions. This project narrative shall include a signed certification by a registered professional as described in Section 2.3 of this Manual. B. A description of the Erosion Prevention BMPs, Sediment Control BMPs, and water quality BMPs, including their use, drainage area, maintenance, and inspections. C. Description of all post -construction stormwater management measures that will be installed during the con struction process to address water quality in stormwater discharges after the construction operations have been completed. D. Summary tables for the pre and post development peak discharge rates at each point of analysis for the 2-, 10-, 25-, and 100-year, 24 hour storm events. E. Summary tables for any ponds or other stormwater detention/retention features, including the bottom, normal water level ( NWL), if applicable, top of bank, and water surface elevation (WSE) at the 2-, 10-, 25-, and 100-year, 24-hour storm events. 5. Maps showing the existing project area, including the following: A. A vicinity map indicating north arrow, scale, property boundary, and other information necessary to locate the property or tax parcel. The map shall show the proposed site, adjacent roads, and existing drainage structures including pipes, ditches, streams, lakes, catch basins, and similar facilities. The map shall be of sufficient scale to determine features of the proposed site. Any off -site facilities or property located upstream and downstream that might be impacted by the stormwater runoff from th e project shall be shown on the location sketch . Multiple maps may be included to convey this information. B. The location of the land disturbing activity with the property boundary outline d shown on a United States Geological Survey (USGS) 7.5 minute topographic map or copy, with the route of stormwater runoff from the site to the nearest waterbody shown. Page 27 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 18 of 58 C. Federal Emergency Management Agency (FEMA) flood maps and, if available, federal and state wetland maps. The maps or plat shall show the location of the 100-year flood plain with known floodways, if applicable. D. Soils map, including the soil type and associated Hydrologic Soil Group (HSG). E. Pre- and post- drainage maps both showing stormwater runoff directions and drainage areas, time of concentration flow paths, outfall locations, points of analysis, and receiving waters. 6. Full-size construction plans at an appropriate scale with the limits of disturbance, north arrow, scale, datum, and other pertinent information included on all sheets. The plan set, at a minimum, shall indicate: A. The existing and proposed topography showing spot elevations with contours not greater than one (1)-foot intervals, as required by the County. The plat and topographic map shall conform to provisions of applicable state regulations. Existing contours should extend off -site to the extent necessary to show how the proposed site is tying into the existing area. B. Existing site conditions to include, at a minimum, exi sting buildings, structures, drainage features, stormwater infrastructure, utilities, and waters of the state (including wetlands). C. Proposed buildings, structures, parking areas, roads, stormwater conveyance system, BMPs, and other planned features. The propos ed improvements associated with the Stormwater Management Plan, shown with a scale of no greater than 1 -inch = 50-feet, should include their proposed elevations, including finished floor elevations. D. All ponds and basins shall have the stage/storage tables on the Grading and Drainage plan sheet (or other appropriate sheet). Include the max water surface elevations for each pond for all storm events (2-, 10-, 25-, and 100-year), the normal water surface, and the top of bank . Show location and elevation of emergency spillway and outlet control structure. The location, size, and elevation of any internal or external stormwater management facilities shall be shown with sufficient details to determine the materials of construction and the manner of construction. E. A detailed construction sequence specific to the site, to include removal of sediment from the stormwater system and sediment basins prior to final site stabilization. F. The location of any existing or proposed private or public drainage easements shall be shown. Private easements shall be obtained when stormwater management facilities are located on property not within the proposed site. Private easements shall be established when the stormwater system crosses more than one parcel. See Section 4.2.13 for de termination of easement widths. G. Limits of grading, including limitations of mass clearing, and the surface area involved. H. Erosion and Sediment Control plan sheets with required phasing per the CGP. I. Pipe Profiles showing, at a minimum, pipe size, invert elevations, rim elevations, existing and proposed ground surface, 25-year HGL, and any utility crossings. J. Details for each proposed erosion and sediment control measure and stormwater system component. Page 28 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 19 of 58 7. A Stormwater Management Report with all stormwater management and stormwater drainage computations and calculations, including: A. Pre-development and post -development hydrologic analysis (including the name of the model/procedure used, i.e. ICPR model) , velocities, peak flow rates of discharge, retention volumes, and inflow and outflow hydrographs of stormwater runoff at all existing and proposed points of discharge from the site . If a computer program is used, assure model schematic showing connectivity and key input and output parameters are provided . If the standard program inputs and outputs are inadequate, provide annotations and additional narrative to adequately describe the model. B. Clearly defined discharge points with tailwater assumptions discussed in the narrative. C. Average slope and hydraulic flow length for both existing conditions and for the future developed conditions. D. The existing land use description, in accordance with land use and soil groups from TR-55 (i.e. Wooded-fair cover). E. A Curve Number Analysis for existing and proposed conditions. Wet ponds, wetlands, surface waters, and gravel areas intended for vehicular traffic must be assigned a curve number of 98. F. The amount of pervious and impervious surfaces for both the existing and developed conditions. G. Delineation and tabulation of drainage areas contributing to each inlet, pipe, culvert, ditch, or swale for both existing and proposed conditions. H. The delineated drainage basin and sub-basin areas in acres for both the site and any off -site areas which drain onto or through the site for pre and post development. Include basin areas, curve numbers, time of concentration paths, soils, discharge points (points of analysis, boundary points), and model connectivity. Be sure labels are consistent with calculations and modeling. I. Analysis and c alculations showing the proposed project does not cause adverse upstream impacts. J. Runoff routing calculations for all detention basins showing discharge flow rates, elevations, and volumes retained or detained during applicable storm events . Calculations for storm events with more frequent return periods may be required by the County to be performed to ensure the effectiveness of the system in controlling lesser events. K. For surface storage facilities, stage storage computation and stage discharge computations for major outfall structures shall be based upon appropriate hydraulics. L. For infiltration and subsurface exfiltration systems, the calculations shall be based upon the testing results obtained from a licensed geotechnical engineer as will be described in Section 4. M. Site conditions around points of all surface water discharge, including vegetation and method of flow conveyance from the land disturbing activity. N. Storm sewer analysis, if applicable. Page 29 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 20 of 58 O. Water Quality Calculations showing how t he water quality volume was calculated and supporting calculations for releasing the water quality volume for at least 24 hours, but no greater than 72 hours. See Section 4.4. 8. Erosion and sediment control provisions for during construction, including: A. Provisions to minimize soil compaction, preserve topsoil, and limit disturbance. B. Provisions to control stormwater volume and velocity within the site to minimize soil erosion during construction activity. For outfalls from drainage areas with ten or more disturbed acres, a sediment basin or equivalent sediment control BMP is required . Sediment basins shall include skimmers and baffles. C. Provisions to control stormwater discharges, including both peak flow rates and total stormwater volume, to minimize erosion at outlets and to minimize downstream channel and stream bank erosion during construction activity. D. Provisions to minimize the amount of soil exposed during construction activity including, but not limited to, the following: i. Implement a phased stormwater management plan that limits the amount of exposed soil during construction by outlining the Limits of Disturbance for each phase and by labeling areas that are not to be disturbed throughout the course of construction activities or until a later phase of construction activities; ii. Outline the Limits of Disturbance on the construction plans and label areas within the construction site that are not to be disturbed; iii. Stabilize exposed areas as soon as practical to limit the duration of large areas of exposed soil; and iv. Implement temporary seeding/grassing techniques. E. Provisions to minimize the disturbance of existing steep slopes (i.e., slopes of 30% (~3H:1V) or greater), unless infeasible. F. Provisions to minimize sediment discharges from the site during construction activity. G. Provisions to provide and maintain natural buffers after stormwater runoff is treated by construction site BMPs, unless infeasible during construction activity . Buffer zone management requirements listed in Section 3.2.4 of the SCDES CGP and Georgetown County Zoning Regulations are applicable to all site development projects in Georgetown County. H. Provisions to provide soil stabilization (temporary and permanent). I. Provisions to minimize the discharge of pollutants from dewatering trenches and excavations. Discharges are prohibited unless managed by appropriate BMPs for stormwater and non - stormwater discharges. J. Provisions to design, install, implement, and maintain effective pollution prevention measures to minimize the discharge of pollutants during construction activity . At a minimum, such measures shall be designed, installed, implemented and maintained to: Page 30 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 21 of 58 i. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters shall be tr eated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge; ii. Minimize the exposure of building materials, building products, construction wastes, trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and other materials present on the site to precipitation and to stormwater; and iii. Minimize the discharge of pollutants from spills and leaks and implement chemical spill and leak prevention and response procedures. K. Provisions to manage the following prohibited discharges: i. Wastewater from washout of concrete, unless managed by an appropriate control; ii. Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds and other construction materials; iii. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and iv. Soaps or solvents used in vehicle and equipment washing. L. Design details for structural stormwater controls, which include diversions and swales. 9. Identification and location of water bodies and surface waters adjacent to the site with details of size, side slopes, capacity, and depth. 10. Project specifications (where applicable) for work related to stormwater management and sediment and erosion control. 11. CZC Certification(s), if applicable. 12. USACOE Jurisdictional Determination, third-party wetlands delineation, and/or wetlands permit. 13. Geotechnical Report. This shall include p ercolation tests and soil boring s, or other methods subject to approval by Georgetown County, performed by a licensed geotechnical engineer if wet ponds, dry pond, exfiltration, infiltration, percolation, or any other subsurface system is proposed. The percolation tests and soil boring shall be representative of the design conditions as described in Section 4. 14. Downstream Analysis, as described in Section 4. 5, to include an exhibit showing the drainage path from the site discharge points to the receiving waterbod y, pictures along the way of the receiving system and points of interest, and descriptions of any concerns along the drainage path. 15. A determination that the development is in compliance with the Storm Management and Flood Damage Protection requirements of the Georgetown County Code of Ordinances or a designated variance. 16. Signed Georgetown County BMP Maintenance Agreement and attached Maintenance Plan as provided in Appendix H. The person(s) or organization(s) responsible for operation and maintenance of the facilities included in the C-SWPPP shall be clearly identified. 17. A list of all contiguous property and addressed, stamped envelopes for each property. Page 31 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 22 of 58 18. SCDOT Encroachment permit, if applicable. Or similar permissions from the receiving property owner if the site is contributing runoff to an existing system. 19. Response to c omments letter, with a response to each comment provided to the applicant (resubmittals only). Provide specific locations in the submittal for each comment. Additional information necessary for a complete project review may be required by the County as deemed appropriate. This additional information may include items such as location of public sewers, waterlines, septic fields, wells, etc. All contents of the C-SWPPP and supporting documents shall be submitted electronically. Each item listed on the Stor mwater Submittal Checklist shall be sent as a separate labeled file and sent electronically to the Stormwater Division as described in Section 2.4 . Indicate the number of attachments included within each email. The following items must be mailed or hand delivered: check with proper review fees (Appendix B), addressed and stamped envelopes for each contiguous property, signed Land Disturbance Application, signed BMP Maintenance Agreement, the C-SWPPP signature page, and any other page requiring original signatures, stamps, or seals. 3.2 C-SWPPP Specific Requirements Specific requirements for the C -SWPPP are described here. The County may modify the following items for a specific project or type of project. Specifications for a sequence of construction operations shall be contained on all plans describing the relationship between the implementation and maintenance of sediment controls, including permanent and temporary stabilization and the various stages or phases of earth disturbance and construction. The specifications for the sequence of construction should, at a minimum, include: A. Clearing and grubbing for those areas necessary for installation of perimeter controls. B. Construction of perimeter controls. C. Installation of sediment basins and sediment traps. D. Remaining clearing and grubbing. E. Utility installation and whether storm drains shall be used or blocked until after completion of construction. F. Road grading (if applicable). G. Grading for the remainder of the site. H. Final grading, landscaping, or stabilization. I. Clean out of sediment and debris from stormwater system, to include ponds, inlets, pipes, channels, ditches, and all other components of the system. J. Completion of County Close-Out process. K. Removal of sediment controls. Page 32 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 23 of 58 3.2.1 Jurisdictional Waters and Critical Areas If surface waters, to include wetlands, are suspected to be on-site or within 50 feet of the proposed disturbed area, these must be located and delineated . The County will accept a wetland delineation performed by a third party q ualified professional or a Jurisdictional Determination from the USACOE. A USACOE wetlands permit is required when there are any proposed impacts to the delineated surface waters. If Critical Areas (coastal waters, tidelands, beaches, and beach/sand dune system) are within and/or directly adjacent to the proposed disturbed area and construction site , these shall be located and delineated. Any impacts t o Critical Areas shall be identified on the C -SWPPP with a description of the proposed activities and the amount and type of impact(s). A. Identified Critical Area impact(s) shall be labeled on the C -SWPPP that no work can begin in these areas until all necessary Critical Area authorizations have been obtained for the work. B. If a structural or water quality BMP is proposed to be installed within a Critical Area, the water quality BMP shall be designed, installed and maintained to achieve maximum pollutant removal. 3.2.2 Discharge to a TMDL Watershed or Impaired Waters If a TMDL Water with a pollutant of concern applicable to stormwater discharges from the proposed land development or an Impaired Water with a pollutant of concern applicable to stormwater discharges from the proposed land development has been established and is in effect, then the SWPPP must address the following: 1. For construction projects that disturb less than 25 acres, carefully evaluate all selected BMPs and their ability to control the pollutant(s) of concern. 2. For construction projects that disturb 25 acres or more, provide a written quantitative and qualitative assessment showing that the selected BMPs will control the discharge of the pollutant, or pollutants, of concern from constructi on and post construction within a TMDL watershed, or to a water on the 303(d) List of Impaired Waters. Design professionals shall determine whether runoff from the proposed land development contains pollutants that are already causing impairment of the adjacent waterbody. These pollutant discharges will vary from site to site. If stormwater runoff from the proposed land development will contribute pollutants that already cause water quality impairment, the design professional must demonstrate to the extent practicable that measures and controls will be implemented to prevent further problems to the impairment. There is not a specific methodology that must be followed in determining the BMPs selected and utilized. However, the calculations and descriptions m ust show that the BMPs to be installed will ensure that runoff from the site will not cause or contribute to further degradation of the impaired waterbody. The selection of BMPs to achieve the required results shall be determined through review of monitoring studies of similar BMPs, applicable computation methods and methodologies, application of computer models such as WASP, IDEAL or other methods acceptable to the County Stormwater Engineer. Page 33 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 24 of 58 Computer models can be used by designers to calculate the annual loading for the pollutant of concern for the pre -developed condition as a baseline and the developed condition (with no increase) for impaired waters discharge compliance. SCDES has determined that construction activity contributes to specific im pairments. For sites that drain to a waterbody with a TMDL or impairments for Macroinvertebrate Community (BIO), Turbidity, Total Phosphorus (TP), Total Nitrogen (TN), Chlorophyll-a (CHLA), and Fecal Coliform (FC) (in Shellfish Harvesting waters), specific measures have been listed in the SC DES SWPPP to address these pollutants. They include measures such as soil testing, specific locations of portable toilets, limiting disturbance, etc. These measures need to be included within the Stormwater Management Plan. If the receiving water is listed on the most current South Carolina 303(d) List of Impaired Waters, the C-SWPPP shall be developed so that any stormwater discharges fr om the construction site do not cause, have the reasonable potential to cause, or contribute to an excursion above any state water quality standard. 3.2.3 Sediment and Erosion Control Phased Erosion Prevention and Sediment Control (EPSC) Plans are required for all construction sites with greater than five (5) acres of disturbance. A. Projects less than ten (10) acres in disturbance are required to submit, at a minimum, a 2-Phased EPSC Plan that includes an Initial Land Disturbance Phase and Final Stabilization phases. B. Projects with disturbances greater than or equal to ten (10) acres are required to submit, at a minimum, a 3-Phased EPSC Plan that includes an Initial Land Disturbance Phase, Construction Phase, and Final Stabilization Phase. C. Each phase is required to be identified on at least one (1) separate construction plan sheet and contain a phase specific construction sequence. When permitted work in a live waterway is performed, precautions sh all be taken to minimize encroachment, control sediment transport and stabilize the work area to the greatest extent possible during construction. The C-SWPPP shall identify all allowable sources of non -stormwater discharges, except for flows from firefighting activities that are combined with stormwater discharges associated with construction activity at the Site. Non -stormwater discharges should be eliminated or reduced to the extent where these discharges shall not cause or contribute to violations of water quality standards. 3.2.4 Special Protection Areas Flooding problem areas exist in many locations around the County to the point that stormwate r controls have become overwhelmed, or where controls were never adequately designed or installed to control runoff. Special Protection Areas are those areas that were identified through the Georgetown County Stormwater Master Plan or those areas with repo rted flooding issues that have been identified as areas of concern. These Special Protection Areas (SPAs) can be found on the Georgetown County Stormwater GIS map, available on the Georgetown County website. Page 34 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 25 of 58 Those wishing to develop or redevelop lands within these protected areas shall be required to comply with the minimum standards listed in the preceding sections as well as a more stringent set of design criteria detailed below. These generally focus on either a water quantity (reduce or prevent frequen t and/or extreme flooding) or a water quality problem (prevent or reduce degradation of riverine, estuarine, coastal ecosystems or maintain a designated use(s)) . The site’s presence in a special protection area will be identified during the pre -submittal meeting and should be discussed in the Stormwater Management Report. To relieve existing flooding problems, the following list of design criteria shall be required in designated special protection areas. The requirements in conjunction with the enforcement of other design criteria listed in the sections above are required to provide the necessary controls. 1. The post-development, peak discharge rates is restricted to one -half (1/2) the pre -development rates for the 2- and 10-year storm event or to the downstream system capacity, whichever is less. 2. The increase in post-development runoff volumes for the 2-year frequency 24-hour duration storm above the predevelopment volume shall be stored for a period of at least 24-hours before release. Additional criteria may be established on a case-by-case basis. Page 35 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 26 of 58 SECTION 4 DESIGN STANDARDS 4.1 Stormwater Management General Standards The purpose of this section is to establish minimum engineering standards for the design, construction and maintenance activities of land disturbance in Georgetown County . Land Disturbance shall be approved, consistent with procedures in this Manual and the Ordinance, when the applicant has demonstrated that the proposed development activity has been designed and shall be constructed and maintained to meet each of the following performance standards: 1. To encourage the use of Best Management Practices, i.e. maximum use of on-site storage facilities to reduce runoff flow rates and volumes and minimize erosion and sedimentation. 2. To design, construct, and maintain stormwater management facilities in a manner to control post- development runoff to simulate the time discharge function for pre-development runoff provided residual capacity is available in off-site facilities to accommodate the runoff. 3. To design, construct , and maintain stormwater management facilities in such a manner that erosion or sedimentation does not exceed natural pre-development conditions. 4. To assure that no adverse impacts result from improper location, desi gn, and construction of stormwater management facilities. 5. To design, construct, and maintain stormwater management facilities consistent with mosquito objectives and programs. 6. To protect the water quality of the ocean , estuaries, and the physical characteristics of the beach area by minimizing flow rates, volumes, and velocities of stormwater entering drainage systems discharging to the beach. 7. To design, construct, and maintain stormwater management facilities in compliance with all applicable state and federal regulations, including SCDES Standards for Stormwater Management and Sediment Reduction Regulation 72-300, NPDES General Permit for Storm Water Discharges from SMS4’S SCR030000, SC DES/OCRM Stormwater Management Guidelines for Coastal Resources, and NPDES Permit SCR035106. 4.2 Stormwater Management Design Requirements The design criteria presented within this Manual represent good engineering practices and should be utilized in the preparation of the C-SWPPP. These design criteria are intended to establish guidelines, minimum standards, and methods for sound planning, design, and review process, and are not to be considered iron-clad rules. Alternative methods of design that meet the intentions of this Manual may be submitted to the County for consideration. Table 1 provides a brief overview of the design requirements for Georgetown County . This table is intended to be used as a quick reference guide but is not all inclusive of the requirements within Georgetown County. It is the responsibility of the permittee to ensure all design requirements within this Manual are met. Page 36 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 27 of 58 Table 1: Overview of Design Criteria and Requirements Criteria Design Requirements Size of Development Any disturbed area equal to or over 1.0 acre, or a disturbed area of at least one- half (1/2) acre but located within one-half mile of a coastal receiving water s, must develop a C-SWPPP. See Section 1.3 for more details. Water Quantity Design Storms Post-development peak discharge rates shall not exceed pre-development peak discharge rates for the 2-, 10-, and 25-year, 24-hour storm events. The 100- year storm event must pass safely through the system without damage to structures or the stormwater drainage system. Water Quality Detention/Retention The greater of the first one -half (1/2) inch of runoff from the entire drainage are or the first one (1) inch of runoff from the impervious acreage must be detained on-site on slowly released over a minimum of 24 hours; all detention volumes must be released within 72 hours of the beginning of the rainfall event. Land disturbance within 1,000 feet of shellfish beds must be designed to detain the first one and one-half (1.5) inches of runoff from the disturbed area. Emergency spillway Detention and retention basins must have an emergency spillway to discharge flows above the 25-year, 24-hour storm event water surface elevation. Freeboard All BMPs must have one (1) foot of freeboard above the 100 -year, 24-hour storm event peak water surface elevation. Alternative option to account for 20% sediment storage may be implemented for underground systems. Coastal Zone Certification (CZC) Required for every site in Georgetown County; must get CZC before County can issue final permit approval. Phased Erosion and Sediment Control Plan Phased Erosion Prevention and Sediment Control Plan required for disturbances over 5 acres. See Section 3.2 for details. Construction Sediment Basin Must be designed to meet a removal efficiency of 80 percent or 0.5 ml/L peak settable solids concentration, whi chever is less; surface dewatering required, porous baffles and forebays shall be used when feasible. Downstream Analysis Provide a map showing the drainage flow path from the site to the receiving water body. Include pictures at the point of the site’s d ischarge and along the downstream system. Special Protection Areas Reduce peak runoff rates by half for the 2- and 10-year, 24-hour storm events; Detain the excess runoff volume difference between the pre-development and post development conditions for the 2-year storm event for at least 24-hours. Discharge Velocities Must be reduced to the pre-developed 10-year, 24-hour storm runoff velocity or a non-erosive velocity. Drainage/conveyance channels Must be designed to convey the 10-year, 24-hour storm event with a one-half (1/2) foot freeboard and must completely contain the 25-year 24-hour event (for channels less than three feet in depth); velocities must not exceed 5 ft/sec or must have permanent protection against higher velocities. Geotechnical Report Required for most projects to identify the SHWT and infiltration rates. Page 37 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 28 of 58 4.2.1 General Requirements The following items are general design requirements to be met for land disturbance activities in Georgetown County. 1. Plans, calculations, and supporting documentation as required by this Manual and the Ordinance for th e design, construction , and maintenance of stormwater management facilities shall be prepared and sealed by a Professional Engineer currently licensed in the st ate of South Carolina or a Professional Land Surveyor currently licensed by the state of South Carolina when permitted by the Ordinance. 2. Innovative approaches to stormwater management are encouraged and the concurrent control of flooding, erosion, sedimentation, and stormwater pollution are mandatory. 3. The use of Low Impact Development (LID) in the creation of stormwater infrastructure within a site is highly encouraged. LID can reduce construction and maintenance costs of the stormwater infrastructure, balance growth needs with water quality protection, and create green landscapes that add amenity value to new development. 4. Projects that are developed in phases shall require the submission of a master plan of the entire project. The initial submittal shall control the area proposed in the initial phase to the requirements of this Manual and establish a procedure and obligation for total site control . Applications for individual projects shall be considered only when the phases are totally independent of or m ake sufficient provisions for subsequent phases. 5. Linear projects, for which the use of conventional stormwater BMPs is not practical or feasible, may reference the SCDOT Stormwater Quality Design Manual for alternative stormwater control options. This evaluation and selected approach shall be documented in the Stormwater Technical Report within the C-SWPPP. 6. Development should maximize the amount of rainfall that infiltrates into the soils and minimize the amount of direct overland flow into public drainage facilities, adjoining streets, water bodies, surface waters, and wetlands to the extent feasible. Channeling runoff directly into surface waters is prohibited; instead runoff must be routed to reduce velocities, allow suspended solids to settle and remove pollutants. 7. Where existing wetlands are intended as a component of an overall stormwater management system (for quantity, use of wetlands for water quality treatment is not allowed) , the permit application will not be approved until all necessary federal and state permits have been obtained. 8. A positive outfall for all runoff in excess of that retained shall be provided to a surface water through appropriate easements or rights of way . If the downstream facilities are inadequate to convey the peak discharge for the design rainfall event(s), the proposed development shall accommodate on-site that portion of runoff above the actual capacity. 9. The soil types of a development and contiguous watershed area are of a prime consideration in the design and maintenance of all stormwater management facilities. A Soil Erosion and Sediment Control Plan shall be prepared and submitted as a part of the Stormwater Management Plan. Page 38 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 29 of 58 4.2.2 Hydrologic/Hydraulic Design Requirements A complete watershed hydrologic and hydraulic analysis must be done using a complete model/procedure acceptable to the County. The name of the model/procedure used for the analysis must be included in the C-SWPPP. Design Storms Post-development peak discharge rates shall not exceed pre -development discharge rates for the 2-, 10-, and 25-year frequency 24-hour duration storm event, using the National Resource Conservation Service (NRCS) Type III rainfall distribution with 323 peaking factor . Discharge rates shall be evaluated at designated boundary points identified on the drainage area maps. Boundary points must remain at the same location from pre-development to post-development conditions. Post-development peak discharge rates for the 100-year, 24-hour duration Type III storm event shall be evaluated to ensure that the system can safely pass the storm event without damage to stormwater control structures and without causing increased water elevations or flooding on adjacent properties or to on-site structures. Method of Runoff Rate and Volume Computations The following methods and programs are acceptable for use in determining the peak runoff rate and runoff volumes . Any assumptions used in the computations shall be clearly delineated . The computation results shall be presented in a format that will permit c onfirmation of the results . For methods not outlined below, the applicant shall provide sufficient detail to determine the accuracy of the method or program used. 1. The design discharge rat e for a single pipe or culvert that is not part of a pipe network or system and that drains a watershed of 2 acres or less may be calculated using the Rational Formula. 2. Runoff calculations involving any watershed of over 2 acres, multiple sub -watersheds or multiple drainage inlets, stormwater pipe networks, ponds, detentio n system or BMPs must be analyzed using computer or numerical models that model complex hydrologic and hydraulic watershed responses. For these circumstances, the NRCS/SCS method may be used. 3. Stormwater pipe systems that include one or more junctions must be included in the model. Rainfall Data United States Weather Service Rainfall Data compiled for Georgetown County by the South Carolina Water Resources Commission shall be used. The SCDES CGP requires that each C-SWPPP must use rainfall data from the South Carolina DES Stormwater Management BMP Handbook or another appropriate source such as a local NOAA gauge. Rainfall data from the SC DES BMP manual is provided below as well as a link to the NOAA Precipitation Frequency Data Server (PFDS) webpage. Rainfall Data for 24-Hour Type III Storm Events (Inches) Location 2-yr 10-yr 25-yr 100-yr Georgetown (East) 4.6 7.0 8.5 11.1 Georgetown (West) 3.9 6.0 7.4 9.6 Page 39 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 30 of 58 NOAA PFDS : http://hdsc.nws.noaa.gov/hdsc/pfds The Natural Resources Conservation Service (NRCS) has recently developed new rainfall distributions that replace the standard NRSC (SCS) Type distributions. The new NRCS distributions have default averaged curves based on geospatial location, a s well as a procedure to create custom site-specific distributions using the Atlas 14 rainfall data . These curves may also be used . The Stormwater Management Report should indicate what source was used for rainfall data. Soils Soils properties influence t he relationship between rainfall and runoff with their various rates of infiltration. Soil maps and data can be obtained from the NRCS Web Soil Survey using the link below to determine the Hydrologic Soil Groups (HSG). NRCS Web Soil Survey : http://websoilsurvey.sc.egov.usda.gov/ Soil types are divided into four major HSGs denoted by the letters A through D. “A” soils are those which have high infiltration capacity and subsequently low runoff rates. “D” soils are those with very low infiltration capacity and very high runoff rates. Consideration should be given to the effects of urbanization on the natural HSG. If heavy equipment can be expected to compact the soil during construction , if fill material is brought in the raise the ground surface elevation, or if grading will mix the surface and subsurface soils, appropriate changes should be made in the HSG selection. When encountering Hydrologic Soil Group A/D soils or B/D soils, either A, B, or D may be selected based on site specific characteristics and groundwater levels . However, the HSG selected for pre - development must be the same HSG selected for post-development. Land Cover Land use data shall be taken from the most recent aerial photograph and fi eld checked and updated. The land cover and associated curve number assigned to each portion of the site and any off-site areas as applicable should be clearly described in the Stormwater Management Report with tables and/or figured. Wet ponds, dry ponds intended for stormwater detention, wetlands, surface waters, and gravel areas intended for vehicular traffic must be assigned a curve number of 98. For surfaces not clearly defined in commonly available tables (i.e. permeable pavement), provide supporting d ocumentation of the assigned curve number. The County reserves the right to require verification of hydrologic and hydraulic computations by use of a second computational method at its discretion. The County may require drainage systems to be designed assuming future conditions or build-out of the contributing watershed. Time of Concentration The time of concentration (Tc) shall be determined by calculating the time for a particle of water to travel from the most hydraulically remote point of the project’s watershed to the point of interest. Georgetown County will accept commonly used time of concentration calculations and methodologies. Page 40 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 31 of 58 The maximum allowable overland (sheet flow) flow path is 100 feet. Tailwater The design must account for the stage of receiving waters, or the tailwater, to accurately determine the impacts of the land disturbing activities. The applicant may use one or more of the following methodologies to determine the tailwater conditions , or provide justification for use of other methodologies:  Assume the next downstream pipe of the receiving system is full.  Assume the ditch is flowing 1/2 full if normally dry.  Use the 100-year Base Flood Elevation (BFE) from the FEMA maps, if reasonable.  Check the Mean High High Tide (MHHT) and the downstream location and set the tailwater no lower than this elevation.  Examine the downstream system for high water marks. Tailwater conditions may not be based on existing water surface elevations as examined during a field visit. Conditions must consider water levels in the receiving system during storm events and during wet seasons . The reasoning and justification for the tailwater depth should be included in the Stormwater Report. The tailwater depth may be set to vary with time and for different sto rm events provided evidence is presented to support each situation. Discharge Velocities and Outlet Protection Appropriate Velocity Dissipation devices and/or erosion prevention BMPs must be placed at discharge locations and along the length of any outfall channel to provide non-erosive flow from the outfall to a surface water so that the natural physical and biological characteristics and functions are maintained and protected. Outlet protection measures, such as riprap, may be required to minimize erosion and scour potential . Provide calculations or procedures utilized to select the proper outlet protection and protection dimensions. Silt fence may not be used as an energy dissipater. Stagnant Water Conditions Dead end flow configurations, which create stagnant water conditions, shall not be allowed. All BMPs shall be designed, constructed, and maintained with consideration for the proper control of mosquitoes and other vectors. Off-Site Runoff Runoff from higher adjacent or upstream lands that runs into or through the site shall be considered and provisions for conveyance of such runoff shall be included in drainage plans. As directed by the County Engineer, upstream analysis shall be conducted to ensure the project has capacity to convey upstream runoff and does not cause adverse upstream impacts, such as flooding. Page 41 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 32 of 58 4.3 Stormwater BMP Design Requirements Site designs must include Stormwater BMPs to meet the water quantity and water quality requirements of this Manual and the Ordinance. Runoff from impervious surfaces shall be discharged through retention basins, detention basins, filtering BMPs, Manufactured Treatment Devices (MTDs) and/or subject to some type of BMP prior to discharge from the project site . BMP means a practice or combination of practices determined by the design professional to be the most effective means of preventing or reducing the amount of siltation and pollution discharged from the project site. SCDES has developed a Stormwater Management BMP Handbook and BMP Field Manual tha t should serve as guidance documents to design BMPs required by this Manual . The BMP Handbook and BMP Field Manual include lists of acceptable BMPs, including their specific design performance criteria and operation and maintenance requirements for each st ormwater practice. Copies of these two manuals can be obtained through the local SC DES EQC office or can be downloaded from the stormwater section of SCDES’s website. The SCDOT Stormwater Quality Design Manual may also be referenced for linear land disturbances where more conventional BMPs may not be appl icable or effective. In addition to these guidance documents, the County has requirements associated with certain BMP measures to account for the unique topographic and hydrologic conditions in the County. 4.3.1 Detention / Retention Design Requirements Detention/Retention ponds are often referred to as dry/wet ponds and are designed to d etain stormwater to allow pollutants to settle out and to control the release of stormwater to predevelopment peak discharge rates. If a detention/ retention pond is used for water quantity control, this feature shall also be used for water quality control . They may be used in addition to LID practices . Detention/Retention ponds in Georgetown County must comply with the following design criteria: A. Outlet structures shall be designed in accordance with accepted engineering principles, with particular attention to appropriate hydraulics including orifice, weir, and culvert hydraulics.  If an orifice is equal to or smaller than three (3) inches in diameter, an appropriate trash rack or downturned elbow must be installed on the orifice to prevent clogging. B. Use a watertight pipe outlet barrel -to-riser connection. All pipes that extend th rough an embankment shall have anti -seep collars or filter diaphragms to control the migration of soil materials and to prevent potential embankment failure from “piping” within the backfill soil along the conduit. This must be shown on the detail. C. All constructed dams or embankments shall have a clay core with an excavated cutoff trench. D. All ponds should have easements or other means of access around the entire pond for maintenance and repair activities . This access should be at least fifteen (15) feet in width and no more than 10% in slope, measured perpendicular to the pond. E. For water quantity control, outlet structures shall be designed to discharge a peak flow rate equal to or less than the pre -development runoff peak flow rates for the 2-year, 10-year, and 25 -year frequency 24-hour duration Type III storm event. Page 42 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 33 of 58 F. The pond shall have one (1) foot of freeboard above the 100-year, 24-hour storm event peak water surface elevation. G. Any pond shall not overtop the banks or utilize the emergency spillway during the 2 -year, 10- year, or 25-year 24-hour storm events. H. If the pond is intended to be a dry pond, the pond bottom must be at least 0.5 ft above the SHWT, as determined by a licensed geotechnical engineer. I. If the pond is intended to be a wet pond, there must be at least four (4) feet of water between the bottom of the pond and the NWL. J. If the pond is intended to be a wet pond, the design shall include safety benching to reduce safety risks. A minimum 10-foot-wide aquatic/safety bench around the perimeter of the wet stormwater detention facility (with exception of the forebay area) with the inside edge of the shelf 6” below the permanent pool level and the outside edge 6” above the permanent pool level with a resulting slope of 10H:1V must be provided when site area is greater than 2 acres. K. Inside and outside pond bank slopes shall be no steeper than 3H:1V L. If the downstream drainage facilities are inadequat e to convey the peak discharge for the design storm events such that the proposed land disturbance will cause increased downstream water surface elevations, storage volume shall be added to accommodate that portion of the runoff above the actual downstream carrying capacity and/or the outlet structure shall be sized to restrict the peak discharge rates to accommodate downstream conditions. M. Where a basin discharges into a stream, ditch, swale or water body, an energy dissipater shall be installed to reduce discharge velocities to minimize soil erosion and sediment transport. N. For detention and retention basins, an emergency spillway shall be required at an elevation above the 25-year, 24-hour storm event peak water surface elevation to discharge flows in excess of the 25-year storm event and to safely pass the 100-year, 24-hour storm event. It should be located so the discharge does not erode the basin or receiving channel. O. Ponds should have permanent forebays at all locations where pipes discharge into the pond above the normal water surface elevation. 4.3.2 Underground Detention Devices Underground detention devi ces and systems are limited due to hig h groundwater table levels, maintenance requirements, and other issues that may arise short and/or long term from various issues such as maintenance, storage, and access. These requirements apply to underground systems that do not account for infiltration or exfiltration; if infiltration or exfiltration is included in the design, refer to Section 4.3.3 and Section 4.3.4. If underground detention is incorporated into a site design, it shall be designed using the following criteria: A. Underground detention systems must have pretreatment in place. The system shall not receive runoff directly from an impervious area without pretreatment to reduce system clogging and maintenance. B. The maximum contributing drainage area to be served by a single underground detention vault or tank is five (5) acres. Page 43 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 34 of 58 C. All systems shall be designed and laid out to facilit ate maintenance. Systems should be cleaned out (sediment and debris removal) at least once a year, but more frequently if necessary. As with all stormwater controls, a maintenance schedule shall be submitted with the BMP Maintenance Agreement. D. If the underground detention system is under a roadway, driveway, parking lot, building, or other structure, a load analysis must be performed for the system by a qualified engineer to show an H- 20 loading. E. Access must be provided over the inlet pipe and outflow structures. Access openings can consist of standard frame, grated and solid cover, or preferably a removable panel. Access or inspection ports shall be available at least every 100 feet. F. All underground detention systems shall accommodate a volume reduction of at least 20% due to sediment storage. That is, calculations shall show that the General Design Standards in Section 4.2 can be met if the storage capacity of th e underground detention system is decreased by 20% due to sedimentation. G. Appropriate anchoring is required to prevent flotation of the underground storage tank. H. A geotechnical report is required to determine the seasonal high -water table (SHWT) at the proposed location of the underground detention. If the SHWT is higher than the bottom of the underground detention, the system must be wrapped in an impervious layer or designed such that the SHWT elevation is the lowest elevation of storage used in the calculations. I. System configurations which create stagnant water conditions are to be avoided. J. The slope of the bottom of the infiltration practice shall not exceed 5 percent. K. The system shall have an emergency overflow. L. Georgetown County reserves the right to require phased inspections from the manufacturer or authorized representative at critical install points (e.g. installation of inspection ports, installation of bedding and prior to covering the device) and provide documentation of the inspections to Georgetown County. M. The County must be notified at least three (3) business days prior to the installation of any underground practices. The County may require that a County Inspector or manufacturer’s representative be onsite to verify installation. N. Georgetown County reserves the right to require that the feasibility of underground devices be evaluated by a soil scientist, geotechnical engineer, or other individual certified by the State of South Carolina in water table estimation. 4.3.3 Infiltration BMP Requirements and Soil Testing Infiltration BMPs are systems in which surface water is directly delivered to the system, which relies on infiltration for the treatment and release of stormwater runoff from the BMP . These systems may not rely solely on infiltration for the release of stormwater. 1. Design A. Permanent infiltration practices, when used, shall be designed to accept, at a minimum, the first one (1) inch of runoff from all impervious areas of the site. Page 44 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 35 of 58 B. Soil testing with soil borings performed by a licensed geotechnical engineer must be done to determine the infiltration rates, soil composition, and SHWT. C. Infiltration practices are limited to soils having an infiltration rate of at least 0.5 (one-half) inches per h our. On-site soil borings and textural classifications must be accomplished to verify the actual site and seasonal high water table conditions when infiltration is to be utilized, as described below. D. Areas draining to these practices must be stabilized and vegetative filters or other pretreatment measure must be established prior to runoff entering the system. Infiltration practices shall not be used if a suspended solids filter system does not accompany the practice . If vegetation is the intended filter, there shall be at least a 20 foot length of vegetative filter prior to stormwater runoff entering the infiltration practice. E. The bottom of the infiltration practice shall be at least one (1.0) foot above the SHWT, whether perched or regional, determined by direct piezometer measurements, which can be demonstrated to be representative of the maximum height of the water table on an annual basis during years of normal precipitation, or by the depth in the soil at which mottling first occurs. F. The infiltration practices shall be designed to completely drain of water within 72 hours. G. The practice shall have one (1) foot of freeboard above the 100 -year, 24-hour storm event peak water surface elevation. H. Infiltration practices greater than 3 feet deep shall be locate d at least 10 feet from basement walls. I. Infiltration practices designed to handle runoff from impervious parking areas shall be a minimum of 150 feet from any public or private water supply well. J. The slope of the bottom of the infiltration practice shall not exceed 5 percent. K. The practices shall not be installed in fill material as piping along the fill/natural ground interface may cause slope failure. L. An infiltration practice shall not be installed on or atop a slope whose natural angle of incline exceeds 20 percent. M. If the infiltration practice is entirely or partly underground: i. It shall be designed for the prevention of clogging by fine materials and for ease of cleaning with conventional vacuum cleaning equipment. This may include but not necessarily be limited to wrapping of the Infiltration BMP ( perforated pipes/chambers/trenches) with an appropriate nonwoven geotextile fabric and providing sufficient clean outs for the system. ii. Systems shall have an overflow to a positive drainage system with a control device, if necessary, between the subsurface system and the positive drainage system. The overflow pipe shall be sized for the allowable discharge with measures to provide a non -erosive velocity of flow along its length and at the outfall. iii. Underdrains are required. iv. Clean outs will be provided, at a minimum, every 100 feet along the infiltration practice to allow for access and maintenance. Page 45 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 36 of 58 v. If the infiltration practice is under a roadway , driveway, parking lot , building, or other structure, a load analysis must be performed for the system by a qualified engineer to show an H-20 loading. vi. In lieu of the requirement to provide one (1) foot of freeboard, the storage capacity of the system should design for a 20 percent reduction in storage space to account for sediment deposition. That is, calculations shall show that the General Design Standards in Section 3.1 can be met if the storage capacity of the underground detention system is decreased by 20% due to sedimentation. 2. Soil Testing – Infiltration Rates and SHWT A. Soil testing for infiltration rates shall be performed by a licensed geotechnical engineer B. A minimum of one (1) location shall be tested for infiltration rates for each BMP. Additional locations may be needed depending on the size and layout of the BMP. In general, these tests shall be conducted in the center of the BMP. C. The initial test elevation location shall be at the same contour elevation as the bottom/invert of the Infiltration BMP. Tests shall also be conducted to a depth 2 feet below the bottom/invert of the BMP. D. Infiltration BMPs shall be designed and validated on the basis of actual test data . Tests shall be consistent as to soil conditions, proposed Infiltration BMP elevations, Infiltration BMP locations and water table depths with the proposed Infiltration BMP system. E. The following tests are allowable to determine infiltration rate for soils (Other test methods must be approved by County): i. Laboratory Permeameter Test for saturated hydraulic conductivity on undisturbed soil samples (ASTM D 5084). ii. Double Ring Infiltrometer Test to estimate the initial vertical unsaturated permeability data of the upper soil layer (ASTM D 3385). iii. Constant Head Test in soils with permeability that allow keeping the test hole filled with water during the field test (AASHTO T 215). iv. Falling Head Test in areas with excellent soil percolation where keeping the test hole filled with water is not feasible during the test. 3. The County must be notified at least three (3) business days prior to the installation of a ny underground infiltration practices . The County may require that a County Inspector or manufacturer’s representative be onsite to verify installation. 4.3.4 Underground Exfiltration BMPs Requirements and Soil Testing Exfiltration BMPs are underground systems, such as perforated pipes, in which stormwater runoff is delivered to the system via inlets, catch basins, or other such structures and it allowed to slowly release into the surrounding soils. 1. Design Page 46 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 37 of 58 A. Soil testing with soil borings performed by a licensed geotechnical engineer must be done to determine the infiltration rates, soil composition, SHWT, and a determination of the Hydraulic Gradient using ground water profiles. B. The bottom of the exfiltration trench shall be a minimum of one (1) foot above the SHWT. C. Design must account for 20 percent reduction in storage space to account for sediment deposition. That is, calculations shall show that the General Design Standards in Section 3.1 can be met if the sto rage capacity of the underground detention system is decreased by 20% due to sedimentation. D. Exfiltration systems must be accessible from catch basins spaced no further than 100 feet apart to allow for maintenance . Catch basins shall not be smaller than 2 f t by 3 ft and the system must terminate at a catch basin. E. The slope of the exfiltration system shall be a slope of zero percent (0%) between the catch basins. F. The system shall have an emergency overflow. G. When rock is part of the system, the treatment volum e shall be calculated using the void volume of the rock used in the exfiltration trench and the volume of the pipe or underground chamber. H. The voids ratio of No. 57 stone shall not exceed 40% and washed No. 57 stone shall not exceed 33%. Only washed stone or rock without fines are acceptable for use in the exfiltration trench. I. Filter fabric must be laid perpendicular to the direction of the trench. J. Installation shall require continuous on -site observation by the Engineer or qualified professional and Site Inspection Reports shall be provided to the County for the entire installation of the exfiltration system. 2. Soil Testing A. The permeability of the soil must be greater than one (1) in/hr. B. Soil testing for infiltration rates shall be performed by a licensed geotechnical engineer. C. The initial test elevation location shall be at the same contour elevation as the bottom /invert of the Exfiltration BMP. D. Exfiltration BMPs shall be designed on the basis of actual test data . Tests shall be consistent as to soil conditions, proposed Infiltration BMP elevations, Infiltration BMP locations and water table depths with the proposed Infiltration BMP system. E. The following tests are allowable to determine infiltration rate s for soils (Other test methods must be approved by County): i. Laboratory Permeameter Test for saturated hydraulic conductivity on undisturbed soil samples (ASTM D 5084). ii. Double Ring Infiltrometer Test to estimate the initial vertical unsaturated permeability data of the upper soil layer (ASTM D 3385). Page 47 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 38 of 58 iii. Constant Head Test in soils with permeability that allow keeping the test hole filled with water during the field test (AASHTO T 215). iv. Falling Head Test in areas with excellent soil percolation where keeping the test hole filled with water is not feasible during the test. 3. The Recover Time Calculation shall be based on Darcy’s Law, Q=KiA A. The Recover Calculation can only consider horizontal flow through the one third of the side area of the exfiltration trench that is filled with water at any given time f or any given storm event. i. The Recovery Calculation must have a factor of safety of 2. B. The County must be notified at least three (3) business days prior to the installation of any underground infiltration practices. The County may require that a County Inspector be onsite to verify installation. 4.3.5 BMP Maintenance Plan The effectiveness of each BMP implemented on a site depends upon appropriate design and maintenance. The C-SWPPP must contain a BMP Maintenance Plan (considered to be Attachment A) and Geor getown County Stormwater Management BMP Maintenance Agreement, included in Appendix H of this Manual, for each BMP incorporated into the stormwater system. The maintenance plan must address both maintenance and monitoring procedures as outlined in the SC DES BMP Handbook and Field Manual, which, when followed, will prevent: 1. Blocking hindering, or obstructing the natural or intended flow of surface waters 2. Improper operation of stormwater retention or impoundment device used for water quality improvement 3. Any condition that would damage the County’s stormwater collection system or the quality of the County’s waters 4. Any conditions specifically declared to be dangerous to the public health, safety, and general welfare of the County’s inhabitants In addition to the above maintenance procedures, Attachment A should also include a BMP Exhibit that shows the location of all stormwater features and BMPs (including pipes, catch basins, manholes, ponds, outfall structures, emergency spillways, channels, riprap, MTDs, inlet filters, water quality devices, underground detention, bioretention areas, etc.). Nonstandard BMPs should include details (outfall structures, underground detention, proprietary systems, etc.) so that BMPs or proprietary systems can be replaced or rebuilt as originally designed if needed. The BMP Exhibit should be on 8.5x11 inch pages (several pages if needed for legibility). Site features should be shaded back so that stormwater features appear bold and clearly visible. Once approved by the County, the original signed BMP Maintenance Plan and Exhibit will be placed at the County’s Register of Deeds Office. The permittee shall set up an appointment with the Register of Deeds office to record the signed BMP Agreement and Maintenance Plan. Page 48 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 39 of 58 4.4 Water Quality Requirements Water quality control is also an integral component of stormwater management and must be provided for all new impervious area on the site. The following design criteria are established for water quality protection. The site must capture and slowly release the greater of: one (1) inch over the impervious area on the site, or one -half inch over the entire site . Land disturbance within 1,000 feet of shellfish beds must be designed to capture and slowly release the first one and one-half (1.5) inches of runoff from the disturbed area. Calculations must be provided showing the required treatment volume for each of these conditions, with the greater of the two volumes clearly identified . If there is more than one method of water quality treatment, calculations should be shown for the area draining to each BMP. The calculations should show a direct product of the area multiplied by the two rainfall amounts, not accounting for land use or soil conditions. Calculations or hydrographs must show that this volume is released over a period of at least 24 hours, with the volume being completely released within 72 hours of the beginning of the storm event. Other design standards may be acceptable to the County if they achieve an equivalent removal efficiency of 80 percent for total suspended solids based on annual removal. These will be evaluated on a case-by-case basis. Design MTDs to treat, at a minimum, the peak flow rate of the stormwater runoff from the 1.8 -inch, 1-year, 24-hour storm event for the entire drainage area to the BMP. Refer to SCDOT Supplemental Technical Specification for Stormwater Manufactured Treatment Devices (MTDs) SC -M-815-13 or latest revision for design requirements. 4.5 Downstream Analysis Downstream analysis shall be required for all new development and redevelopment sites to determine the downstream effects from any development activity . The downstream analysis shall include the assumptions, results and supporting calculations to show safe passage of post -development design flows downstream. The analysis of downstream conditions in the report shall address each discharge point along the project site’s boundaries at which runoff exit s the property. The analysis shall focus on the portion of the drainage channel or surface water immediately downstream from the project. In calculating runoff volumes and discharge rates, consideration may need to be given to any planned or known future upstream land use changes. Engineering analysis shall be implemented to investigate the downstream effects from any development activity. This analysis shall extend downstream to the ultimate receiving water body or to the point in the watershed downstream of the site where the area of the site comprises 10% of the total drainage area. The analysis needs to identify points of concern. The following are typical points of concern to consider when conducting a complete downstream analysis to the ultimate outfall: 1. The first downstream road crossing. 2. Any downstream road crossing or system, or any overbank areas that shows evidence of being undersized or of receiving erosive or damaging flows. 3. Downstream development. Page 49 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 40 of 58 4. Location of known existing flooding, drainage, or erosion problems. 5. Any point as directed by the County. At each point of concern , the engineer needs to take a photograph and document any concerning observations or evidence of existing issues. The analysis shall determine whether the proposed development will have the potential to increase flooding, drainage, or erosion impacts to downstream properties or road crossings during the 100-year, 24-hour storm event. If the downstream analysis determines that the development of a particular site may contribute to flooding, drainage, or erosion problems, then at least one the following im provements shall be implemented: 1. On-site water quantity control. Control of runoff peak discharges and volumes in excess of the requirements of this Manual to prevent downstream impacts. 2. Off-site water quantity control. Use of off-site publicly or privately owned facility to prevent adverse downstream impacts. Hydrologic and hydraulic modeling are required to support the design and the owner/entity must provide written acceptance of such an agreement. 3. Improvements to the downstream storm water conveyance system. Increase the conveyance capacity or implement other improvements to the downstream system. Hydrologic and hydraulic modeling are required to support the design and the owner/entity must provide written acceptance of such an agreement. Evidence must be provided that these improvements will not cause other downstream or upstream impacts. 4.6 Sediment and Erosion Control Requirements The purpose of the Sediment and Erosion Control Plan is to provide effective measures to control erosion and sedimentation ca used by the r emoval of ground surface cover. Effective erosion and sediment control design requires consideration of stormwater flow and soils to be encountered. Proper design includes measures for erosion control and provi sions for the establishment of vegetation that shall help avoid erosion problems during and after development activities. Alignment, grades, area of disturbed soil and bank slopes are based upon soil erodibility, climate exposure, geology, proposed vegetative restoration and expected maintenance. Standards and Guidelines for Design A. Slopes shall be protected from erosion by quick establishment of vegetative cover, erosion control blankets, turf reinforcement mats, benches, terraces, slope protection structures, mulches, polyacrylamide (PAM), or a combination of these practices as required. B. Except as provided below, i nitiate soil stabilization measures as soon as practicable whenever land-disturbing activities have been temporarily or permanently ceased, but in no case more than fourteen (14) days after land -disturbing activity in that portion of the construction site has temporarily or permanently ceased. i. Where snow cover or frozen ground conditions preclude stabilization by the 14th day, stabilization measures shall be initiated as soon as practicable. Page 50 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 41 of 58 ii. Where construction activity on a portion of the construction site is temporarily ceased, and earth-disturbing activities shall be resumed within fourteen (14) days, temporary stabilization measures do not have to be initiated on that portion of the construction site. C. Drainage channels and conveyance measures shall be designed to avoid erosion problems. Wide channels with flat slopes lined with grass or other vegetation should be used where practical. All conveyance measures shall be designed to meet the following requirements/standards: i. Each conveyance measure shall be stabilized and capable of handling the 10 -year 24-hour storm event with non-erosive flow conditions during construction and post-construction. If the velocity exceeds five ( 5) feet/sec, then permanent velocity dissipation measures, devices, and/or erosion prevention BMPs shall be installed to provide non -erosive flow conditions. ii. Complete stabilization of stormwater conveyance channels within seven ( 7) days of the completion of channel construction. Examples of vegetative and non-vegetative stabilization techniques include channel liners, rolled erosion control products (e.g., erosion control blankets and turf reinforcement mats), riprap, geotextiles, or other armoring materials that are suitable for use in areas with concentrated or channelized flow. Application of mulch, hydro- mulch, tackifier, or similar erosion prevention practices that are erodible, conveyable, or that obstruct flow when used in areas with concentrated or cha nnelized flow in stormwater conveyance channels is prohibited. iii. Design channels to avoid disturbed areas and to reduce erosion. Divert concentrated flows of off-site stormwater running onto the site and within the construction site to avoid contact with soils exposed during construction, unless infeasible. Prevent erosion of channel embankments, outlets, adjacent streambanks, slopes and downstream waters during discharge conditions through the use of velocity dissipation devices (e.g., check dams, sediment t raps, riprap, or grouted riprap at outlets) within and along the length of any constructed stormwater conveyance channel, and at any outlets to provide a non-erosive flow velocity. iv. New point discharges onto adjacent property where there was not a point discharge previously are not allowed, unless written permission from the adjacent property owner is provided. A twenty (20) foot minimum buffer shall be provided, where feasible, between the property line and the discharge point. Level spreaders, plunge pools , etc. shall be provided when the proposed outlet is near the property line and not directed to an existing outfall, such as a creek or ditch. All outlets from a storm sewer system shall not discharge on fill slopes. v. Appropriate velocity dissipation devices and/or erosion prevention BMPs shall be placed at discharge locations and along the length of any outfall channel to provide non -erosive flow from the structure to a surface water so that the natural physical and biological characteristics and functions are maintained and protected. Silt fence may not be used as an energy dissipater. D. Stormwater runoff and drainage to a single outlet from land disturbing activities, which disturb ten (10) acres or more, shall be controlled during the land disturbing activity by a sediment basin where sufficient space and other factors allow these controls to be used until the final inspection. The sediment basin shall be designed and constructed to accommodate the anticipated sediment loading from the land disturbing activ ity and meet a removal efficiency of eighty (80) percent suspended solids or 0.5 ml/L peak settable solids concentration, whichever is less. The efficiency Page 51 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 42 of 58 shall be calculated for disturbed conditions for the 10-year, 24-hour design event. In addition, the sediment basin shall be designed to meet the following requirements: i. Consider public safety as a design factor for the sediment basin, and alternative sediment controls must be used where construction site limitations would preclude a safe design. ii. The County may on a case-by-case or watershed-by-watershed basis require the use of a larger storm event and/or a larger storage volume when designing sediment basins or equivalent sediment control BMPs. iii. Unless infeasible, properly design, install and maintain po rous baffles, or similar control measures capable of enhancing settling capabilities and restricting the accumulation of sediment around the outlet structure, in all temporary sediment traps and sediment basins to reduce velocity, turbulence, and improve sediment trapping efficiency. iv. Unless infeasible, sediment forebays, or similar control measures capable of providing sediment trapping at inlets of sediment basins , such as porous baffles, should be installed as practicable based on sediment storage requirements of each sediment basin. v. Unless infeasible, each sediment basin should be equipped with a cleanout stake indicating when the basin is to be cleaned. vi. When discharging from sediment basins, utilize outlet structures that only withdraw water from near th e surface of the basin or impoundment unless infeasible. This outlet structure should be capable of conveying the flow for the 10 -year, 24 -hour storm event. Select an appropriate riser structure which operates in weir or barrel flow control and prevent orifice/riser flow control. vii. Detention basins may also be used to trap sediment during and after development. When used for this purpose, the basin shall continue to detain stormwater in accordance with the hydraulic design criteria, but storage volume for stormwater shall be required to account for the volume lost to sedimentation. Sediment shall be removed periodically to ensure the intended performance of the basin. E. Good stands of existing vegetation adequate to control erosion shall be preserved wherever possible. Regeneration of trees and other large vegetation should be encouraged wherever possible. F. Inlet protection shall be provided at all existing and newly installed inlets that receive stormwater runoff from the disturbed areas. G. Outlet protection shall be provided at all existing and newly installed outlets, within the construction site’s boundary, that discharge stormwater runoff from the disturbed areas. Silt fence shall not be used as outlet protection. 4.7 Vector Control All BMPs shall be designed, constructed and maintained with consideration for the proper control of mosquitoes and other vectors. Practices may include, but are not limited to: Page 52 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 43 of 58 1. The bottom of retention and detention ponds should be graded and have a slope not less than 0.5 percent. 2. There should be no depressions in a normally dry detention facility where water might pocket when the water level is receding. 3. Normally dry detention system and swales should be designed to drain within 72 hours. 4. Normally wet detention and retention systems should have a permanent pool of at least four (4) feet to discourage the production of mosquitos and other vectors. 5. An aquatic weed control program should be utilized in permanently wet structures to prevent an overgrowth of vegetation in the pond. Manual harvesting is preferred. 6. Fish may be stocked in permanently wet retention and detention ponds. 7. Normally, dry swales and detention pond bottoms should be constructed with a gravel blanket or other measure to minimize the creation of tire ruts during maintenance activities. 4.8 Easements All stormwater BMPs, storm sewers, storm water conveyance drainage systems , and open channels must be constructed within either public rights-of-way, or public or privately owned easements. The easement shall conform substantially in relation to the lines of the system and be of sufficient width to convey stormwater . Adequate access for maintenance and equipment shall be required and provided. No approval will be given for the construction or improvement of any public storm sewer, storm water conveyance systems or open channels without provision of suitable permanent easement or right -of-way. Restriction on easements shall include prohibiting all fences and structures that would interfere with access to the easement areas and/or the maintenance function of the drainage system. Maximum allowable cross slope for any easement is 10H:1V. 1. Existing Easements: Each existing easement to be used shall be shown on the plans included in the C-SWPPP submittal package. The information on the plans shall include the deed book and page number of the recorded instrument. All restrictive clauses as to the use of the easement shall be noted on the plan adjacent to the specific easement. The restrictions may include but are not limited to:  Utility (gas, electric, telephone, and water) purposes only,  Drainage purposes only; and,  Sanitary sewer purposes only. Construction of storm water conveyance drainage systems will not be permitted in existing exclusive gas, electric, water, telephone, or sanit ary easements unless a drainage easement is acquired overlapping the existing easement with approval from the County and the affected utility. 2. Culvert/Buried Pipe Easement Widths : Drainage and maintenance easements shall provide adequate room for a contractor or owner to construct and perform maintenance of the stormwater structure or feature. Minimum drainage easement widths for buried pipes or culverts shall be as follows: Page 53 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 44 of 58 Stormwater Pipe Easement Widths Pipe Size (inches) Maximum Depth to Invert (ft) Width of Drainage Easement (ft) 15-18 4.0 20 24-36 6.0 26 36-54 7.0 30 >54 9.0 36 Notes: 1. Drainage easement width(s) shall be increased by six (6) feet for every additional foot of depth exceeding the maximum depth to invert shown. 2. For pipe sizes not specifically listed above, the easement width and depth to invert shall be that of the next size up. 3. For larger pipe sizes and/or multiple lines of pipe easement width shall be as determined by the Director of Public Works. 3. Open Channel Easement Widths: Drainage and maintenance easements for open channels shall be dependent on the size of the channel . For those open channels three (3) or less in depth, the easement width shall be calculated based on the following equation: W = (Depth of Swale x 6) + 10 Rounded up or down to a 5’ increment. Where: 3:1 Slope of the swale on each side 5’ access is provided on each side For those open channels greater than three (3) feet in depth, the easement width shall be calculated based on the following equation: W = B + ((Depth of channel x 2) + (12’+5’)) Rounded up to the next 5’ increment Where: B = bottom width of ditch 12’ = Access for equipment, provided on one side 5’ = Access opposite side of equipment access 4. Stormwater BMPs: Access easements shall be a minimum of 15 feet in width and must allow for access of the entire practice for maintenance and repair activities. Any variation from the above prescribed easement widths shall be documented and explained in the Stormwater Management Report. In no case shall any proposed pipe, culvert, open channel, or BMP have an easement of less than ten (10) feet in width. Page 54 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 45 of 58 SECTION 5 STORM SEWER COLLECTION SYSTEM Effective drainage of roadways is essential to the maintenance of roadway service level and to traffic safety. Water on the pavement can interrupt traffic, reduce skid resistance, increase potential for hydroplaning, limit visibility due to splash and spray, and cause difficulty in steering a vehicle when the front wheels encounter puddles. Design criteria for the collection and conveyance of runoff on public roadways are typically based on roadway classification and reasonable frequency of traffic interference. Roadway collection systems are comprised of roadway sections, gutters to collect runoff, inlets to capture runoff, and stormwater pipes to convey the runoff. This section presents guidance for the design of surface drainage, gutter flow, inlet capacity, and storm sewer capacity. Georgetown County and SCDOT requirements should be followed as applicable. 5.1 General Design Criteria Stormwater systems shall be designed to convey the 25 -year, 24 -hour design flow under non - surcharged conditions. Stormwater culverts under arterial and multi-lane collector roadways shall be designed to convey the 50 -year, 24-hour design storm. Convey shall mean to pass the flow without any backwater effects on the upstream system. If the stormwater system is part of a roadway to be accepted by the SCDOT, the system design is governed by SCDOT design criteria. 5.2 Gutters There are various types of gutter sectio ns available for use in roadway design. The gutter type may be determined by the needs for additional carrying capacity to accommodate the allowable spread or the requirement for safe passage of pedestrian traffic. The following types of gutter sections ar e allowable for use in Georgetown County: 1. Conventional Gutters 2. Composite Gutters 3. Valley Gutters These gutter sections shall be designed based on the design criteria in the HEC-22, Urban Drainage Design Manual (Federal Highway Administration (FHWA), 2009) and AASHTO’s Drainage Manual (American Association of State Highway Transportation Officials (AASHTO) 2014). Other gutters deemed practical and technically sound to meeting the criteria of this design manual may be submitted prior to design commencement for approval by the County Stormwater Manager on a case-by-case basis. 5.3 Inlets Inlet design and location limit the amount of inundation, or spread, on a roadway. It is important that the spread of flow, the distance from the face of the curb to the edge of the flow in the roadway, does not impede traffic or cause a safety concern. General design criteria for inlets are as follows: Page 55 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 46 of 58 1. For local and single -lane collector roadways, the total spread (both sides) of runoff should not exceed 16 feet at any given cross section, and in no case be greater than 10 feet on one side of the street 2. For arterial and multi-lane collector roadways, the spreads should not exceed one-half of the travel lane on a two-lane roadway and may encroach a full travel lane on a four-lane roadway 3. No curb overtopping may occur in sags 4. Depth of spread shall not exceed 6 inches during the 100-year, 24-hour storm event 5. Inlet spacing shall not exceed 400 feet Inlets accepted by Georgetown County can be divided into three categories: 1. Curb-opening inlets: vertical openings in the curb covered by a top slab . Curb inlets should be used on roadways where the expected flow depth at the curb is sufficient for the inlet to perform efficiently. 2. Grate inlets: openings in the gutter covered by one or more grates. Grate inlets intercept all gutter flow that passes over the grate if the grate is sufficiently long and the gutter flow velocity is low. 3. Combination inlets: inlets that include both a curb opening and a grate inlet and act as a single unit. Combination inlets do not appreciably increase the capacity of a grate alone, but can account for larger amounts of debris without decreasing the inlet capacity. The placement of two inlets side by side is referred to as a double inlet and are acceptable for use. Capacity, size, and efficiency shall all be accounted for when designing inlets. These inlets shall be designed based on the design criteria in the HEC-22, Urban Drainage Design Manual (Federal Highway Administration (FHWA), 2009) and AASHTO’s Drainage Manual (American Association of State Highway Transportation Officials (AASHTO) 2014). Other inlets deemed practical and technically sound to meeting the criteria of this design manual may be submitted prior to design commencement for approval by the County on a case-by-case basis. 5.4 Conveyance System Stormwater conveyance systems consists of both open and closed conduits which convey stormwater to outlets. These systems must be designed to accommodate surface runoff from the 25-year, 24-hour storm event with no damage to physical facilities and minimum interruption of normal traffic. The conveyance system shall have a maximum reliability of operation with respect to being structurally sound to its environment where it is placed and performing hydraulically as intended for the entire life of design. The system shall require minimum maintenance (cleaning and clearing of obstructions) and must be accessible for maintenance operations. The system shall be adaptable to accommodate future expansion with minimal additional cost and design. Site design, swales, and natural flow features should be used whenever possible to reduce the need for extensive storm sewer systems. 5.4.1 Stormwater Pipes 1. Stormwater Pipe Materials Page 56 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 47 of 58 Culverts and closed storm drainage systems may be constructed using any of the materials listed in this section . In selecting the culvert material, consider structural requirements and corrosion potential at the site as well as hydraulic requirements. Alternative materials may be considered by the County Stormwater Manager if specifications are provided showing it s comparable strength and longevity to the products listed herein. A. Reinforced Concrete Pipe (RCP) RCP pipe is required in all Georgetown County rights -of-way. It should meet SCDOT Specifications. County staff shall be notified prior to installation of pipe in Georgetown County rights-of-way and may require that County Staff be on site during installation. B. Concrete Box Culverts Cast in place or precast concrete box cul verts are acceptable . Project plans should include structural details for cast in place concrete, or shop plans for precast that have been signed and sealed by a competent licensed professional engineer in the State of South Carolina. Concrete boxes must meet SCDOT standards. Prefabricated culvert structures such as CONSPAN® or similar structures are acceptable if designed and installed in accordance with the manufacturer's recommendations. Project plans should include structura l details and shop plans that are signed and sealed by a competent licensed professional engineer in the State of South Carolina. C. High Density Polyethylene (HDPE) Pipe HDPE pipe culverts and storm drainage systems are acceptable outside of County Road rights- of-way and should be designed and constructed in accordance with the manufacturer's recommendation. HDPE pipe culverts and storm drainage systems shall meet SCDOT standards. 2. Minimum Size All pipes used as part of the stormwater conveyance system should be circular in shape when possible. Elliptical and box culverts may be accepted when necessary, but in no case shall any smallest dimension be less than 15 inches if the pipes are to become part of the public stormwater system. Pipes shall be designed and installed to meet the manufacturer’s recommendations for minimum depth of cover. 3. End Treatments and Transitions Acceptable end treatments may consist of, but are not limited to , end pipe with riprap, concrete headwalls, flared end sections, DOT appr oved safety ends, and any other end treatment that is approved by the County or County appointed designee . HDPE flared end treatments are not allowed. Transitions between pipes of dissimilar materials shall requires a Dissimilar Materials Adapter incorporating a geotextile coupler with mastic coating and stainless steel straps that is properly backfilled per the manufacturer’s installation instructions. 4. Installation All excavations and trenches shall be clean, dry and free of debris before placing pipe. Minimum compaction shall be 90% SPD for all pipes and structures, unless higher compaction levels are Page 57 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 48 of 58 required by the design engineer . Verification of compaction throughout the pipe’s backfill zone trench shall be provided by a licensed geotechnical engineer. Open graded backfill such as washed stone shall be wrapped with a minimum 8-ounce non-woven geotextile to prevent migration of fines into the backfill . The County must be notified at least 24-hour notice prior to installation ; the County may require that a County Inspector be onsite to verify installation. 5. Final Inspection The permittee shall notify GTC Stormwater Division at the end of the project for a final inspection. A final inspection must pass in order to close the permit and start the warranty period. If a final inspection is not conducted and approved, the permittee shall be responsible for any and all failures. Another inspection shall be made at the end of the 1-year warranty period. If at any time during the warranty period the encroachment is not consistent with the original approved permit, the permittee will be responsible for complying with the original encroachment permit requirements. In addition, all newly constructed pipe systems shall be visually inspected, with 100% of the pipe runs video inspected. Joints shall all be panned and inspected and any visible issues such as joint separation, cracking, holes in pipe, or excessive deflection s hall be noted. This should be completed and provided to the County before the final inspection is scheduled. 6. Design A. Design culverts to support a minimum of an AASHTO HL-93 live load together with the appropriate dead load. Heavier live loads may be required if conditions dictate. B. Bury depths greater than 15 feet shall have written approval by the County Engineer or County appointed designee. C. Minimum life expectancy for all culvert materials should be 75 years as certified by the manufacturer. This shall include meeting the design requirements on which the design life is based, such as bedding requirements. D. Pipe sizes and slopes must be designed to ensure that the flow velocity increases progressively at inlets, bends, or other changes in geometry or configuration. Designs shall not allow a larger pipe to discharge into a smaller pipe, regardless of the pipe capacity. E. Pipes that are expected to be partially or completely submerged for any part of the year must be RCP. F. Equalizer pipes to be used between interconnected ponds must be at least 24 inches in diameter and no longer than 600’ in length . Junction box access with no inlets should be provided at least every 100’ for maintenance. The equalizer pipes should have 0% slope with no other stormwater inlets or pipes connected. G. Storm drainage pipe discharging into wet ponds shall have the discharge invert above the permanent pool elevation and rip -rap or other energy dissipation structures shall be placed from the outlet point to one (1) foot below the normal pool elevation. Submerged stormwater systems shall be avoided and shall only be permissible with a variance and approval by the County. Submerged pipes must comply with the following: a. Pre-treatment required for any inlet connected to a submerged pipe system. The BMP owner will be responsible for cleaning and maintaining any inlet insert devices. Page 58 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 49 of 58 b. Catch basins must have a 1’ sump in the bottom. c. Details and a narrative shall be included in the BMP Maintenance Plan explaining the pipe and pond pump down plan for pond and stormwater system maintenance. d. A third-party inspector is required to document installation of all submerged runs with pictures/videos/reports. A report of the installation shall be submitted and certified by the engineer of record prior to County acceptance of infrastructure. e. Pipes are to be inspected before installation and all defective pipes removed from site – provide in report f. Pipes must be gasketed and joints wrapped a minimum of 18” in either direction g. A third-party geotechnical professional must confirm compaction around the pipe in 6” lifts at 95% modified proctor h. Georgetown County Stormwater shall be provided 48 hours’ notice and given the opportunity to view installation of all submerged runs. H. Manholes shall be located at pipe junctions; changes in alignment, size, and slope; and ends of curved sections. Manholes shall be placed at intervals not to exceed 100 feet. I. Pipe alignments shall be straight when feasible . Long ra dius curves may be allowed to conform to street alignments; short radius curves may be used on larger pipes to reduce head losses at junctions. These curves may be produced by angling the joints (keep this at a minimum to maintain a tight joint) or by fab ricating beveled heads. Pipe deflection shall not exceed the manufacturer’s recommendations, unless precast or cast -in-place bends are specifically designed for deflection. All curved alignments must be approved by the County Stormwater Engineer prior to design commencement. J. Stormwater pipe flow should be calculated using the Manning’s equation, either directly or through use of a model that implements the Manning’s equation. The County will accept commonly used computers models or methodologies capability of analyzing the hydraulic capacity of proposed storm drain pipelines and systems. K. All pipes must have a slope at or greater than 0.25%, or the minimum mean flow velocity in a stormwater pipe flowing full shall be 2.0 feet per second. Flow velocities must be sufficient to prevent excess deposition of solid material that could result in clogging. L. Maximum velocities are important to prevent excessive erosions on the stormwater inverts and outlets. The table below lists the maximum velocities allowed for each type of pipe. Energy dissipaters are required at outfalls where the stormwater pipe flow exceeds the maximum permissible velocity. Maximum Velocity in Stormwater Pipes Description Maximum Permissible Velocity Culverts (all types) 15 ft/s Collector Pipes 15 ft/s Main Pipes 12 ft/s Page 59 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 50 of 58 M. It is important to consider the energy gradient and profile of storm sewers to prevent operating the pipes under pressure when possible. If (1) the slope and pipe sizes are chosen such that the pipe slope is equal to or greater than the friction slope, (2) the inside top surfaces of successive pipes are lined up at size changes, and (3) the water surface at the outlet will not rise above the top of the outlet, then the pipes should not be operating under pressure. The slope of the water surface at capacity will be approximately equal to the slope of the pipes . If these conditions are not met, hydraulic and energy grade lines shall be computed. 5.4.2 Open Channels Open channels are frequently an integral component of urban drainage system design. Open channels may be natural channels, constructed channels, ditches, or swales. 1. Freeboard: Open channels shall be designed to convey the 10 -year storm event below its freeboard elevation and the 25-year storm event below its bankfull elevation. A. Channels three feet or less in depth, the freeboard shall be one half foot; B. Channels deeper than three feet and up to five feet deep, one foot of freeboard is required; and C. Channels deeper than five feet, freeboard shall be at least 20 percent of the total channel depth. 2. It should be confirmed that the 100 -year storm event can be conveyed without impacting the finished floor elevations of structures . Additional design information can be found in the HEC - 22, Urban Drainage Design Manual. 3. The channel geometry may vary based on the site conditions and conveyance needs. Channel side slopes shall be stable, with a slope no more steep than 2:1 (H:V). For channels with bottom width greater than ten (10) feet, the bottom cross-slope shall be no less than 12:1 (H:V). 4. Channel linings may be natural materials, imported materials, vegetated, or manufactured . The cost, site requirements, design criteria (peak flow, maximum velocity, and shear stress), and existing conditions may dictate the chan nel lining type . Channel linings shall emulate natural conditions whenever possible. 5. Channel velocity shall be maintained as non-erosive during the design storm event for the channel material type. Peak flows expected during the design storm event shall be permissible for the channel lining type. For channels with manufactured channel linings, the velocity limits shall be established by the manufacturer. 6. If the channel is to be maintained by the County, the corridor must be within a dedicated easement sized according to Section 4. 8. If the channel is not to be maintained by the County, the maintenance of the channel shall be included in the BMP Maintenance Agreement (Appendix H). 5.4.3 Outlet Protection 1. The purpose of outlet protection is to dissipate the energy of concentration stormwater flow through conveyance systems thereby reducing erosion and scouring at the outlets and lowering the potential for downstream erosion . Outlet protection can be turf reinforcement mats, stone or riprap, concrete aprons, paved se ctions, or other structural measures. This applies to the Page 60 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 51 of 58 immediate outlet area or reach below the outlet and does not apply to continuous lining of channels or streams. Outlet protection should be placed at all stormwater conveyance systems outlets. 2. Appropriate velocity dissipation devices and/or erosion prevention BMPs must be placed at culvert discharge locations and along the length of any outfall channel to provide non -erosive flow from the culvert to a surface water so that the natural physical and biological characteristics and functions are maintained and protected. The protection shall have no slope along its length and shall have a straight alignment. 3. Provide calculations or procedures utilized to select the proper outlet protection and protect ion dimensions. Outlet protection design criteria can be found in the SC DES Stormwater Management BMP Handbook. For additional design information or for areas with excessive flow, use the design criteria in HEC -14, Hydraulic Design of Energy Dissipater s for Culverts and Channels (Federal Highway Administration (FHWA), 2006). 5.5 Culverts And Bridges 1. Culverts and bridges must be designed to safely pass the peak flow under roadways, railroads, or other features that cross open channel conveyance systems . It is important that culverts and bridges do not cause excessive backwater or velocities. These features have larger design storm requirements than the stormwater conveyance system: A. Residential and collector roadways cross-drain culverts: must convey the 25-year storm event. B. Arterial road culverts: must convey the 50-year storm event. C. All culverts and bridges must pass the 100 -year storm event without damage to physical facilities (i.e. finished floor elevations of buildings, roadway embankments and subgrades). 2. Inlet and outlet Discharge velocities shall not impact channel stabilities . A scour analyses shall be performed for critical culvert and bridge structures if requested by the County Stormwater Engineer, municipality, state, or federal jurisdictions. At a minimum, all inlet and outlet locations impacted by flow velocities near structures shall include channel protection where erosive flow velocities occur. The mean minimum velocity through a culvert flowing full shall be 2.0 feet per second, the lower limit of scouring velocity, to prevent the settling of materials. 3. Allowable culvert material shall be according to Section 5.4.1 of this Manual. 4. Culvert length shall be adequate to accommodate required headwalls, sloping of embankments, end wall treatments, and any other applicable inlet/outlet protections. The slope of the culvert shall conform to the existing naturalized channel slope and shall not impede flows along the bottom of the open channel. For culverts the minimum geometry for circular culverts is 15 inches in diameter. Bridges shall be designed to not impact channel flow characteristics. 5. Headwalls shall be used for any inlets at pipes larger than 24 inches diameter. These inlets shall not impact embankment stability or erosion. Wingwalls, inlet apr ons, and other structural means may be used to provide additional inlet protection. Page 61 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 52 of 58 6. If the exit velocity is high and/or the receiving channel conditions are pro ne to erosion and destabilization of the channel, outfall energy dissipaters for culverts or channel armor shall be required. Materials may include properly sized stone riprap, stilling basins, hardened control devices, or natural structures, designed in accordance with FHWA HEC-14, Hydraulic Design of Energy Dissipaters for Culverts and Channels, 1983. 7. The culvert or bridge must be in compliance with the National Flood Insurance Program. It is necessary to consider the 100-year storm event at the local identified special flood hazard areas. 8. The County Stormwater Manager may require the use of a computer model to accurately evaluate the complex hydraulic conditions of culverts and bridges to ensure compliance with this manual. Page 62 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 53 of 58 SECTION 6 INSPECTIONS 6.1 Permittee/Owner Construction Inspections Inspections performed by the Permittee/Owner shall be conducted by qualified personnel. “Qualified personnel” means a person knowledgeable in the principles and practice of erosion and sediment control who possesses the skills to assess conditions at the construction site that could impact storm water quality and to assess the effectiveness of any sediment and erosion control measures selected to control the quality of storm water discharges from the construction activity . This person must be either the preparer of the C -SWPPP or an individual who is under the direct supervision of the preparer of the approved C-SWPPP and who meets the requirements in this paragraph or an individual who has been certified through the Certified Erosion Prevention and Sediment Control Inspector (CEPSCI) program that has been approved by SCDES. Inspections may also be conducted by a person with a registration equivalent to the registration of the preparer of the C -SWPPP and who meets the qualifications of this paragraph or an individual who is under the direct supervision of the person with an equivalent registration and who meets the requirements in this paragraph. After construction begins, inspections shall be conducted at least once every calendar week and within 24-hours after each rainfall event that produces one (1) inch or more of rainfall. Inspection frequencies for portions of the construction site that have reached temporary or final stabilization may be reduced to at least once every month, as long as the stabilization is maintained and there is no additional disturbance in these areas. Once a definable area has reached final stabilization, mark on the OS - SWPPP and no further inspection requirements apply to that portion of the Site. Inspection of common BMPs, such as sediment basins and sediment traps, may be required to resume if areas that drain to them become disturbed during future construction. The County, on a case-by-case basis, may require any Permittee to conduct inspections on a more frequent basis than prescribed . Examples include, but are not limited to, Permittees who have compliance problems and Permittees with stormwater discharges to environmentally sensitive waters. The County may require on a case -by- case basis that the Permittee submit a monthly report summarizing the inspections at the site and any associated maintenance activity. Inspections shall include all areas of the site disturbed by construction activity and areas used for storage of materials that are exposed to precipitation . Inspectors shall look for evidence of, or the potential for, pollutant s entering the storm water conveyance system . Sedimentation and erosion control measures identified in the C-SWPPP shall be observed to ensure proper operation. Discharge locations shall be inspected to ascertain whether erosion control measures are effective in preventing violations to SC’s Water Quality Standards, where accessible. Where discharge locations are inaccessible, nearby downstream locations shall be inspected to the extent that such inspections are practicable. Locations where vehicles enter or exit the site shall be inspected for evidence of off-site sediment tracking. Utility line installation, pipeline construction, and other examples of long, narrow, linear construction activities may limit the access of inspection personnel to the areas described above. Inspection of these areas could require that vehicles compromise temporarily or even permanently stabilized areas, cause additional disturbance of soils, and increase the potential for erosion . In these circumstances, controls shall be inspected on the same frequencies as other construction projects, but representative inspections may be performed. For representative inspections, personnel shall inspect controls along Page 63 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 54 of 58 the construction site for 0.25 mile above and below each access point whe re a roadway, undisturbed right-of-way, or other similar feature intersects the construction site and allows access to the areas described above. The conditions of the controls along each inspected 0.25 mile segment may be considered as representative of t he condition of controls along that reach extending from the end of the 0.25 mile segment to either the end of the next 0.25 mile inspected segment, or to the end of the project, whichever occurs first. Representative inspections shall include any areas where stormwater discharges to environmentally sensitive waters. Permittees shall either maintain an on-site rain gauge or use data from a certified weather record (such as a personal weather station or an airport) located within a reasonable proximity of the construction site to record rainfall records from any significant rainfall event, 0.5 inches or greater. These recorded rainfall amounts shall be maintained in a Rain Log located in the OS -SWPPP. Rainfall records for the day of an inspection and any ra infall since the last inspection shall be reported on each weekly inspection report. For each inspection required above, an inspection report (SCDES Form D-0496) shall be completed. At a minimum, the inspection report shall include: 1. The inspection date and duration of inspection (arrival and departure times). 2. Names, titles, and, if not previously given in an inspection report, the qualifications of personnel making the inspection, unless those qualifications change. 3. Weather information for the peri od since the last inspection (or since commencement of construction activity if the first inspection) including a best estimate of the beginning of each storm event, duration of each storm event, approximate amount of rainfall for each storm event (in inches), and whether any known discharges have occurred. 4. Weather information and a description of any discharges occurring at the time of the inspection. 5. Location(s) of discharges of sediment or other pollutants from the site. 6. Location(s) of BMPs that need maintenance. 7. Location(s) of BMPs that failed to operate as designed or proved inadequate for a particular location. 8. Location(s) where additional BMPs are needed that did not exist at the time of inspection. 9. Corrective action required including any changes t o the OS -SWPPP necessary and implementation dates. 10. Site name, operator name and permit number. 11. Verification that all BMPs and stormwater controls identified in the OS -SWPPP have been installed and are operating as designed. A record of each inspection and of any actions taken in accordance with this section shall be retained as part of the C -SWPPP for at least three years from the date that permit coverage expires or is terminated. The report shall be signed in accordance with §122.22 of SC Regulation 61-9. Page 64 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 55 of 58 Inspectors employed by the Primary Permittee retain the authority to inspect, report, and document areas of the construction site that are under direct control of the Secondary Permittee, but only when a lack of compliance by the Secondary Permittee inhibits the Primary Permittee’s ability to maintain compliance with the overall OS-SWPPP. Third party inspections, by a qualified individual who is independent of the owner, may be required at the discretion of the County Engineer at sites that have compl iance problems and at sites where stormwater discharges to environmental sensitive waters (such as w aters classified as Outstanding Resource Waters, Shellfish Harvesting Waters, etc.) . Inspections must be done by qualified professionals as outlined in the SCDES’s Construction General Permit (SCR -100000). Inspection reports shall be submitted to the County every two weeks or 30 days if the site has been temporarily stabilized and approved by the County showing results of inspections, weather conditions, corrective actions and other information as may be required by the County Engineer. 6.2 Construction Maintenance Proper operation and maintenance of BMPs is critical to ensure that the effectiveness and integrity of the BMPs as water quality controls is maxim ized. This insurance is critical in a performance -based program of stormwater runoff controls. BMP maintenance is the responsibility of the facility owner. All BMPs and other protective measures identified in the OS-SWPPP shall be maintained in effective operating condition. If construction site inspections identify BMPs that are not operating effectively, maintenance shall be performed within seven (7) calendar days, before the next inspection, or as soon as reasonably possible, and before the next storm event whenever practicable to maintain the continued effectiveness of the BMPs. If periodic inspection or other information indicates that a BMP has been used inappropriately, or incorrectly, the Permittee shall address the necessary replacement or modification required to correct the BMP within a time frame of forty-eight (48) hours of identification. If existing BMPs need to be modified or if additional BMPs are necessary, implementation shall be completed before the next storm event whenever practicable. If implementation before the next storm event is impracticable, the situation shall be documented in the OS-SWPPP and alternative BMPs shall be implemented as soon as reasonably possible. Remove deposited sediment from sediment traps or sedimentation basins when the design capacity has been reduced by fifty (50) percent or the sediment has reached the clean out point on the cleanout stake (whichever occurs first). Remove deposited sediment collected by sediment control measure (silt fence, check dams, sediment tubes, etc.) when the deposited sediment reaches one-third ( 1/3) the height of the above -ground portion of these BMPs, or before it reaches a lower height based on the manufacturer's specifications. Page 65 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 56 of 58 6.3 County Inspection All elements of the storm drainage system must be inspected by the County during construction as a prerequisite for acceptance by the County. It is the contractor's responsibility to ensure that the County is notified and has the opportunity to make those inspections before the system is backfilled or covered. The inspections conducted by the County are for the protection of the County only. They are not intended to certify the contractor's satisfactory discharge of his contractual obligation to the owner, nor do they relieve the engineer-of-record from any of his responsibilities concerning certification of the project. County Inspectors are authorized by the County to inspect and enforce the re quirements of this Manual and the approved C-SWPPP. The inspectors shall be: 1. Authorized to conduct inspections on behalf of the County and file reports for periodic inspections as necessary during construction of stormwater systems to assure compliance with the approved SWPPP. 2. Authorized to furnish the permittee or agent the results of inspection in a timely manner after the completion of each required inspection. 3. Authorized to issue a Correction Notice to the permittee or agent when any portion of the work does not comply with the approved plans. 4. Authorized to issue a Notice of Violation (N OV) to the permittee or agent when any portion of the work does not comply with the approved plans. 5. Authorized to Issue a Stop Work Order as the result of unsafe conditions, working without a permit, unsatisfactory work, progress, or other non-compliance. 6. Authorized to perform a final inspection upon the completion of the storm water system to determine if the completed work is constructed in accordance with the approved storm water design plan, approved “As -built” plan , in accordance with the County’s As -Built Survey Requirements (Appendix E), certified by the permittee’s registered professional engineer. Any enforcement actions or corrective actions will be issued to the permittee as listed on the approved NOI and County Land Disturbance Application. If the site has an Individual NOI, the owner listed on the Individual NOI shall be the responsible party. Page 66 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 57 of 58 SECTION 7 PERMANENT BMP MAINTENANCE The land owner or person in possession or control of the land shall maintain all stormwater BMPs and devices and all open space areas required by the approved SWPPP unless those measures, devices, and open space areas are accepted for maintenance by another agency. For all stormwater BMPs, a signed Maintenance Agreement and approved attached Maintenance Plan is required in accordance with Section 4.3.5. A clear statement of defined maintenance responsibility shall be established during the permit application review and approval process. This statement ensures that structural BMPs will be maintained post-construction. If they are not being properly maintained, the County has the authority to require maintenance to be done at the expense of the person responsible for maintenance as listed on the Maintenance Agreement. The maintenance agreement shall be recorded with the County Register of Deeds prior to the recording of any new lot served by the stormwater BMP or prior to the issuance of any development permit for any existing lot except for improvements. The maintenance covenant shall be binding on all subsequent owners of land served by the stormwater BMP. A recorded copy of the maintenance covenant shall be provided to the County prior to the issuance of a County Land Disturbance Permit. Where a pipe or other man-made conveyance is used to transport runoff to an off-site facility and that conveyance passes through a public street ROW or other publicly owned property, an encroachment and maintenance agreement shall be approved by the County prior to the issuance of permits. 7.1 County Permanent Structure Maintenance Inspections The purpose of County maintenance inspections is to ensure that permanent stormwater management BMP structures are working properly and remain functional. No later than 30 days after completion of construction of any project that utilizes BMPs to meet the site performance standards, the County will conduct a post-construction inspection to verify that the BMP has been installed per approved plans. The operators/owners must notify the County of their completion of active construction so the pos t- construction inspection may be conducted by the County. The County has the authority to inspect any BMP at least once a year as needed. 1. The County will attempt to contact the owner before a maintenance inspection and will notify the owner after an inspection. The County shall conduct maintenance inspections at reasonable times. 2. If the owner cannot be contacted, the inspection shall be performed and a report shall be sent to the owner. 3. Upon refusal by any property owner to permit an inspector to enter or continue an inspection, the inspector shall terminate the inspection or confine the inspection to areas where no objection is Page 67 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Page 58 of 58 raised. The inspector shall immediately report the refusal and grounds to the County. The County shall promptly seek the appropriate compulsory process. 4. In the event where it is believed that discharges from the property may cause imminent and substantial threat to human health or the environment, the inspection may take place at any time without notice. 5. Inspection Reports shall be maintained in a permanent file located in the Stormwater office. 6. A Correction Order and/or Notice of Violation shall be issued for any required maintenance needed. 7. After a notice to comply is given in writing, a specified period of time shall be allocated for the owner/permittee to begin the required maintenance activities. If an imminent hazard exists and the owner fails to comply with the required maintenance activities, the County shall employ the necessary labor and materials to perform the required w ork as expeditiously as possible. The owner shall be assessed the costs of the maintenance labor and materials. The costs shall become a lien on the property and shall be collected in the same manner as County taxes. 7.2 Owner Maintenance Inspections Inspections of permanent BMPs and other stormwater controls are to be conducted by the Owner or person in possession or control of the land in accordance with the maintenance schedule and plan depending on the specific BMP. This will be done to ensure that routine and remedial maintenance is being performed and that the BMPs are operating properly. The inspection includes a certification by a South Carolina registered professional engineer, registered landscape architect, or registered land surveyor, or other quali fied individual that appropriate maintenance is being performed. The following certification is to be made with accompanying stamp or seal, signature and date. "I certify that the BMPs, stormwater management facilities, and open space areas referenced in this document have been maintained in conformance with the approved stormwater management plan and maintenance manual. This certification is made based on personal observation or on the observation by someone under my direct supervision of the site and review of maintenance records." These inspections should be provided to the County at their request to show compliance with the approved BMP Maintenance Agreement and Maintenance Plan. Page 68 of 229 Appendix A Georgetown County Stormwater Submittal Checklist Page 69 of 229 Appendix A: Georgetown County Stormwater Submittal Checklist This Georgetown County Stormwater Submittal Checklist must be filled out and submitted to the County as part of the C-SWPPP and application for a Land Disturbance Permit. Please include the location of each item within the application package to acknowledge that this item is included in your submittal in the appropriate location and in compliance with the Georgetown County Stormwater Design Manual. If you do not feel that a component is not necessary for your permit application, please note “N/A” in the location and attach a sheet to this checklist explaining to Georgetown County the reasoning. NOTE: This checklist is not all-inclusive, and the applicant is responsible for ensuring compliance with all federal, state, and County requirements. C-SWPPP Submittal Components Location 1. Completed Stormwater Pre-Submittal Meeting 2. Completed Stormwater Submittal Checklist 4. Completed and Signed Georgetown County Land Disturbance Permit 5. Check with proper review fees Hard Copy Required 6. SWPPP Report 7. Stormwater Management Report 8. Drainage Basin Maps (Pre and Post Development) 9. Identification of Tailwater Conditions 10. Summary Tables (peak runoff and pond stage) 11. Downstream Analysis 12. Water Quality Calculations 13. ACOE Wetlands Jurisdictional Determination (Preliminary or Approved, as applicable) OR third-party wetland determination, and permit (if applicable) 14. Geotechnical Report, to include SHWT determination 15. Complete set of plans 16. Georgetown County Stormwater Management BMP Maintenance Agreement Original Hard Copy Required 17. BMP Maintenance Plan (Attachment A to Maintenance Agreement) 18. OCRM CZC approval 19. List of all contiguous property owners and addresses with stamped/ addressed envelopes. Do not include a return address. Hard Copy Required 20. SCDOT encroachment permit, if applicable 21. Response to Comments letter (for all submittals after the first submittal) 3. Copy of the DHEC NOI Page 70 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Appendix B Georgetown County Fee Schedule Page 71 of 229 /0/1/2 /3 /4 /1 /5 /2 /6 /7 /i255 /9 /2 /10 /7 /5 /11 /i255 /12/1/13 /14 /3 /5/15/1/7 /5 /i255 /2 /16 /i255 /17 /10 /18 /19 /20 /21 /i255 /22 /1 /3 /23 /20 /21 /1 /24/i255 /22 /5 /2 /3/15/6 /14/5 /1 /3 /i255/12/20/23 /20 /24 /20 /2 /7/i255 /25 /26 /26 /27 /28 /29 /30 /31 /28 /32 /i255 /34 /32 /29 /35 /32 /36 /37 /38 /31 /39 /i255 /40 /i255/41/32/29 /42 /43 /27 /36 /44 /45 /i255 /i255 /i255 /i255 /17 /10 /18 /19 /20 /21 /i255 /22 /1 /3 /23 /20 /21 /1 /24 /i255/12/1/13 /14 /3 /5/15/1/7 /5 /i255 /48 /49 /50 /i255 /51 /52 /53 /54 /55 /54 /56 /i255 /51 /57 /53 /54 /54 /57 /i255 /i255/58/i255 /i255/59/54/60 /53 /61 /54 /57 /60/62/56/63 /i255 /51/64/i255/i255 /65 /66 /67 /67 /49 /i255 /68 /69 /60 /56 /54 /70 /i255 /50 /67 /71 /72 /73 /67 /73 /72 /71 /71 /65 /73 /i255 /i255/58/i255 /i255 /74 /75 /76 /70 /i255 /50 /67 /71 /72 /73 /67 /73 /72 /71 /67 /50 /71 /i255 /i255/58 /i255 /i255/54/77/75/78 /79 /70 /i255 /53 /52 /80 /81 /56 /56 /82 /54 /83/61 /57 /52 /60 /81 /56 /57 /82 /84 /60 /53 /61 /i255 /i255 /i255 /86 /87 /88 /i255 /89/90 /91 /92 /i255 /90 /93 /i255 /94 /88 /95 /93 /90 /95/96/97/98 /99 /i255 /100 /92 /90 /95/96/101/102/92 /88 /95 /i255 /103 /104 /102 /98 /i255 /95 /88 /105 /97 /88 /101 /91 /i255 /102 /98 /106 /i255 /90 /93 /i255 /102 /106/96/97/98 /97 /91 /92 /88 /95 /97 /98 /99 /i255 /102 /94 /94 /104 /97 /89 /102 /92 /97 /90 /98 /91 /i255 /93 /90 /95 /i255 /107 /90 /108 /98 /92 /109 /i255 /91 /92 /90 /95/96/101/102 /92 /88 /95 /i255 /94 /88 /95/96/97/92 /91 /i255 /105 /102 /95 /109 /i255 /110 /102 /91 /88 /106/i255 /90 /98 /i255 /92 /87 /88 /i255 /91 /97/111 /88 /i255 /102 /98 /106 /i255 /89 /90/96/94/104 /88 /112 /97 /92 /109 /i255 /90 /93 /i255 /92 /87 /88 /i255 /106 /88 /105 /88 /104 /90 /94/96/88/98 /92 /113 /i255 /86 /87 /88 /i255 /93 /88 /88 /i255 /91 /89 /87 /88 /106 /108 /104 /88 /i255 /94 /95 /88 /91 /88 /98 /92 /88 /106 /i255 /110 /88 /104 /90 /101 /i255 /97 /91 /i255 /88 /91 /92 /102 /110 /104 /97 /91 /87 /88 /106 /i255 /92 /90 /i255 /102 /91 /91 /97 /91 /92 /i255 /97 /98 /i255 /93 /97 /98 /102 /98 /89 /97 /98 /99 /i255 /92 /87 /88 /i255 /107 /90 /108 /98 /92 /109/i255 /100 /92 /90 /95 /96/101 /102 /92 /88 /95 /i255/114/102/98 /102 /99 /88/96/88/98 /92 /i255 /103 /95 /90 /99 /95 /102/96/113/i255 /86 /87 /88 /95 /88 /93 /90 /95 /88 /115 /i255 /102 /91 /i255 /90 /93 /i255 /116 /108 /104 /109 /i255 /117 /115 /i255 /118 /119 /118 /120 /115 /i255 /92 /87 /88 /i255 /93 /90 /104 /104 /90 /101 /97 /98 /99 /i255 /93 /88 /88 /i255 /91 /89 /87 /88 /106 /108 /104 /88 /i255 /91 /87 /90 /108 /104 /106 /i255 /110 /88 /i255 /97/96/94/104 /88/96/88/98 /92 /88 /106 /121 /i255 /122 /123 /124 /125 /i255 /127 /128 /i255 /129 /125 /130 /125 /131 /127 /124/132/125/133 /134 /i255 /127 /135 /i255 /136 /137 /134 /138 /130 /138 /134 /123 /i255 /i255/139 /138 /140 /125 /i255 /127 /128 /i255 /129 /125 /130 /125 /131 /127 /124/132/125/133 /134 /i255 /i255/139 /134 /141 /133 /142 /141 /135 /142 /i255 /143 /125 /125 /i255/136 /142 /142 /138 /134 /138 /127 /133 /141 /131 /i255 /143 /125 /125 /i255/i255 /144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255 /100 /97 /98 /99 /104 /88 /i255 /147 /102/96/97/104 /109 /i255 /i255 /148 /112 /88/96/94/92 /145 /i255 /149 /150 /90 /i255 /144 /88 /105 /97 /88 /101 /115 /i255 /150 /90 /i255 /147 /88 /88 /151 /i255 /i255 /144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255 /100 /97 /98 /99 /104 /88 /i255 /147 /102/96/97/104 /109 /i255 /117 /i255 /152 /89 /95 /88 /i255 /90 /95 /i255 /153 /95 /88 /102 /92 /88 /95 /i255 /i255 /154 /117 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255 /155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255 /96/102/112 /i255 /154 /117 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255 /154 /118 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /118 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255 /147 /102/96/97/104 /109 /i255 /100 /108 /110 /106 /97 /105 /97 /91 /97 /90 /98 /i255 /119 /113 /120 /i255 /102 /89 /95 /88 /91 /i255 /102 /98 /106 /i255 /101 /97 /92 /87 /97 /98 /i255 /119 /113 /120 /i255/96/97/104 /88 /i255 /90 /93 /i255 /144 /88 /89 /88 /97 /105 /97 /98 /99 /i255 /160/102/92 /88 /95 /i255 /161 /90 /106 /109 /i255 /90 /95 /i255 /117 /i255 /102 /89 /95 /88 /i255 /102 /98 /106 /i255 /108 /94 /113 /i255 /154 /117 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255 /155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255 /96/102/112 /i255 /154 /117 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255 /154 /118 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /118 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255 /114/108/104 /92 /97 /145 /147 /102/96/97/104 /109 /i255 /i255 /119 /113 /120 /i255 /102 /89 /95 /88 /91 /i255 /102 /98 /106 /i255 /101 /97 /92 /87 /97 /98 /i255 /119 /113 /120 /i255/96/97/104 /88 /i255 /90 /93 /i255 /144 /88 /89 /88 /97 /105 /97 /98 /99 /i255 /160/102/92 /88 /95 /i255 /161 /90 /106 /109 /i255 /90 /95 /i255 /117 /i255 /102 /89 /95 /88 /i255 /102 /98 /106 /i255 /108 /94 /113 /i255 /154 /118 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255 /155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255 /96/102/112 /i255 /154 /118 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /150 /90 /98 /145 /144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /i255 /i255/119 /113 /120 /i255 /102 /89 /95 /88 /91 /i255 /102 /98 /106 /i255 /101 /97 /92 /87 /97 /98 /i255 /119 /113 /120 /i255/96/97/104 /88 /i255 /90 /93 /i255 /144 /88 /89 /88 /97 /105 /97 /98 /99 /i255 /160/102/92 /88 /95 /i255 /161 /90 /106 /109 /i255 /90 /95 /i255 /117 /i255 /102 /89 /95 /88 /i255 /102 /98 /106 /i255 /108 /94 /113 /i255 /154 /118 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255 /155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255 /96/102/112 /i255 /154 /118 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /114/102/162 /90 /95 /i255/114/90/106 /97 /93 /97 /89 /102 /92 /97 /90 /98 /i255 /90 /93 /i255 /152 /94 /94 /95 /90 /105 /88 /106 /i255 /103 /104 /102 /98 /i255/152 /98 /109 /i255/i255 /154 /157 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255 /155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255 /96/102/112 /i255 /154 /157 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255 /154 /158 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /158 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /114/97/98 /90 /95 /i255/114/90/106 /97 /93 /97 /89 /102 /92 /97 /90 /98 /i255 /90 /93 /i255 /152 /94 /94 /95 /90 /105 /88 /106 /i255 /103 /104 /102 /98 /i255/152 /98 /109 /i255/i255 /154 /118 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255 /155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255 /96/102/112 /i255 /154 /118 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /152/91/145 /161 /108 /97 /104 /92 /i255 /103 /104 /102 /98 /i255 /144 /88 /105 /97 /88/101/i255 /152 /98 /109 /i255 /154 /119 /i255 /93 /90 /95 /i255 /97 /98 /97 /92 /97 /102 /104 /i255 /91 /108 /110/96/97/92 /92 /102 /104 /i255 /154 /117 /120 /119 /i255 /118/98 /106 /i255/163/i255/157/95 /106 /i255/144 /88 /105 /97 /88/101/i255 /154 /118 /120 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255 /154 /157 /119 /119 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255 /144 /88 /105 /97 /88 /101 /i255 /90 /93 /i255 /152 /94 /94 /104 /97 /89 /102 /92 /97 /90 /98 /i255 /93 /90 /95 /i255 /164 /102 /95 /97 /102 /98 /89 /88 /i255/152 /98 /109/i255/154 /157 /119 /119 /i255/154 /157 /119 /119 /i255 /94 /88 /95 /i255 /93 /102 /89 /92 /i255 /93 /97 /98 /106 /97 /98/99 /i255 /96/88/88 /92 /97 /98 /99 /i255/i255 /114/97/98 /90 /95 /i255 /164 /97 /90 /104 /102 /92 /97 /90 /98 /i255/152 /98 /109/i255/154 /118 /120 /119 /156 /88 /102 /89 /87 /156 /106 /102 /109/i255/i255 /114/102/162 /90 /95 /i255 /164 /97 /90 /104 /102 /92 /97 /90 /98 /i255/152 /98 /109/i255/154 /117 /119 /119 /119 /156 /88 /102 /89 /87 /156 /106 /102 /109/i255/i255 /146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255 /106 /108 /88 /i255 /110 /88 /93 /90 /95 /88 /i255 /94 /95 /88 /145 /89 /90 /98 /91 /92 /95 /108 /89 /92 /97 /90 /98 /i255/96/88/88 /92 /97 /98 /99 /i255/119 /113 /120 /145 /120 /113 /119 /i255 /102 /89 /95 /88 /91/i255/154 /117 /119 /119 /113 /119 /119 /i255 /149 /147 /104 /102 /92 /i255 /93 /88 /88 /151 /i255/i255 /146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255 /106 /108 /88 /i255 /110 /88 /93 /90 /95 /88 /i255 /94 /95 /88 /145 /89 /90 /98 /91 /92 /95 /108 /89 /92 /97 /90 /98 /i255/96/88/88 /92 /97 /98 /99 /i255/120 /113 /119 /117 /i255 /145 /117 /119 /113 /119 /i255 /102 /89 /95 /88 /91 /i255/i255 /154 /118 /119 /119 /113 /119 /119 /i255 /149 /147 /104 /102 /92 /i255 /93 /88 /88 /151/i255 /i255 /146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255 /106 /108 /88 /i255 /110 /88 /93 /90 /95 /88 /i255 /94 /95 /88 /145 /89 /90 /98 /91 /92 /95 /108 /89 /92 /97 /90 /98 /i255/96/88/88 /92 /97 /98 /99 /i255/117 /119 /113 /119 /117 /i255 /159 /i255 /102 /89 /95 /88 /91 /i255/i255 /154 /158 /119 /119 /113 /119 /119 /i255 /149 /147 /104 /102 /92 /i255 /93 /88 /88 /151/i255 /i255 /100 /92 /90 /94 /i255/160/90/95 /165 /i255 /166 /95 /106 /88 /95 /i255 /144 /88 /145 /146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255/152 /98 /109 /i255 /154 /117 /119 /119 /i255 /94 /88 /95 /i255 /95 /88 /145 /97 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255/i255 /150 /90 /92 /88 /121/i255 /144 /90 /108 /98 /106 /i255 /155 /97 /91 /92 /108 /95 /110 /88 /106 /i255 /152 /95 /88 /102 /i255 /92 /90 /i255 /150 /88 /102 /95 /88 /91 /92 /i255 /86 /88 /98 /92 /87 /i255 Page 72 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Appendix C Georgetown County Close-Out Application Form Page 73 of 229 /0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □ □/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□ /31 /32 /33 /34 □ /35 □ /36 /37 □ /38 □ /39 /40 /41 /42 /43 /40 /44 /41 /45 /46 □ /48 /41 /49 /46 /44 /50 □ /51 /40 /52 /53 /42 /44 /54/40 /46 /44 □ /41 /55 □ /56 /49 /57 /58 /59 /60 □ /61 /40 /42 /62 /59 /60 /40 /63 □ □ □ □ /65 /66 /67 /68 /69 /70 /67 /71 /72 □ /74 /75 /75 /66 /76 /65 /74 /72 /76 /67 /77 □ /78 /67 /79 /80□ /81 /82 /83 /84 □ /37 /36 /85 /86 □ /86 /87 /84 /88 □ /89 /34 □ /37 /83 /90 /90 /34 /91 □ /36 /87 /88 □ /37 /36 /85 □ /92 /34 /36 /85 /33 /34 /88 /36 /93 /94 □ /95 /36 /87 /94 /88 /96 □/97 /32 /94 /91 □ /98 /83 /84 /88 /87 /85 /89 /32 /94 /99 /34 □ /100 /99 /88 /83 /101 /83 /88 /96 □ /31 /85 /36 /102 /34 /99 /88 /84 □ /85 /34 /103 /87 /83 /85 /83 /94 /33 □ /32 □ /104 /88 /36 /85 /86 /93 /32 /88 /34 /85 □ /95 /36 /94 /84 /88 /85 /87 /99 /88 /83 /36 /94 □ /100 /105 /105 /85 /36 /101 /32 /90 □ /87 /105 /36 /94 □ /99/36 /86 /105 /90 /34 /88 /83 /36 /94 □ /36 /37 □ /99 /36 /94 /84 /88 /85 /87 /99 /88 /83 /36 /94 /106 □ □ /107 /32 /86 /34 □ /36 /37 □ /31 /85 /36 /102 /34 /99 /88 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /104 /88 /36 /85 /86 /93 /32 /88 /34 /85 □ /31 /90 /32 /94 □ /110 /34 /101 /83 /34 /93 □ /100 /105 /105 /85 /36 /101 /32 /90 □ /98 /32 /88 /34 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /107 /31 /98 /111 /104 □ /31 /34 /85 /86 /83 /88 □ /95 /36 /101 /34 /85 /32 /33 /34 □ /107 /87 /86 /89 /34 /85 □ /112 /83 /37 □ /32 /105 /105 /90 /83 /99 /32 /89 /90 /34 /113 /108 □ /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /75 /79 /67 /75 /69 /79 /72 /114 □ /76 /77 /78 /67 /79 /80/74 /72 /76 /67 /77 □ /100 /106 □ /116 /93 /94 /34 /85 /117 /98 /34 /101 /34 /90 /36 /105 /34 /85 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /100 /91 /91 /85 /34 /84 /84 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /31 /82 /36 /94 /34 □ /112 /98 /32 /96 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /95 /34 /90 /90 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /121 /32 /122 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /111 /123 /86 /32 /83 /90 □ /100 /91 /91 /85 /34 /84 /84 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /124 /106 □ /31 /85 /36 /105 /34 /85 /88 /96 □ /100 /91 /91 /85 /34 /84 /84 □ /112 □ □ /95 /82 /34 /99 /125 □ /89 /36 /122 □ /83 /37 □ /84 /32 /86 /34 □ /32 /84 □ /32 /89 /36 /101 /34 /113 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /31 /32 /85 /99 /34 /90 /117 /81 /126 /104 □ /127 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /95 /106 □ /31 /85 /34 /101 /83 /36 /87 /84 □ /116 /93 /94 /34 /85 □ /107 /32 /86 /34 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /100 /91 /91 /85 /34 /84 /84 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /31 /82 /36 /94 /34 □ /112 /98 /32 /96 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /95 /34 /90 /90 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /121 /32 /122 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /111 /123 /86 /32 /83 /90 □ /100 /91 /91 /85 /34 /84 /84 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /98 /106 □ /111 /94 /33 /83 /94 /34 /34 /85 /118 □ /81 /34 /99 /82 /94 /83 /99 /32 /90 □ /110 /34 /105 /85 /34 /84 /34 /94 /88 /32 /88 /83 /101 /34 □ /36 /85 □ /121 /83 /85 /86 /108 □ /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /100 /91 /91 /85 /34 /84 /84 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /31 /82 /36 /94 /34 □ /112 /98 /32 /96 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /95 /34 /90 /90 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /121 /32 /122 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /111 /123 /86 /32 /83 /90 □ /100 /91 /91 /85 /34 /84 /84 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /68 /128 /129 /130 /131 /132 /133 /128 /134 /130 □ /135 /136 /137 /136 /138 /136 /129 /139□ /140 /9 /141 □ /142 /12 /28 /13 /21 /29 □ /142 /12 /28 /22 /21 /11 /12 /28 /20 /8 □ /143 /5 /144 □ /145 /27 /22 /8 /146 /8 /13 □ /145 /21 /22 /8 /8 /21 □ /147 /8 /12 /22 /26 /8 /21 /12 /24 /13 /148 □ /145 /142 □ /5 /144 /1 /1 /15 □ Page 74 of 229 /0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □ □/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□ /31 /32 /33 /34 □ /35 □ /36 /37 □ /35 □ /38 /39 /40 /41 /42 /43 /40 /44 /45 □ /47 /48 /48 /39 /49 /38 /47 /45 /49 /40 /50 □ /51 /40 /52 /53□ /54 /55 /56 /57 □ /37 /36 /58 /59 □ /59 /60 /57 /61 □ /62 /34 □ /37 /56 /63 /63 /34 /64 □ /36 /60 /61 □ /37 /36 /58 □ /65 /34 /36 /58 /33 /34 /61 /36 /66 /67 □ /68 /36 /60 /67 /61 /69 □/70 /32 /67 /64 □ /71 /56 /57 /61 /60 /58 /62 /32 /67 /72 /34 □ /73 /72 /61 /56 /74 /56 /61 /69 □ /31 /58 /36 /75 /34 /72 /61 /57 □ /58 /34 /76 /60 /56 /58 /56 /67 /33 □ /32 □ /77 /61 /36 /58 /59 /66 /32 /61 /34 /58 □ /68 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 □ /73 /78 /78 /58 /36 /74 /32 /63 □ /60 /78 /36 /67 □ /72/36 /59 /78 /63 /34 /61 /56 /36 /67 □ /36 /37 □ /72 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 /79 □ □ /38 /39 /40 /41 /42 /40 /44 /45 □ /49 /50 /51 /40 /52 /53/47 /45 /49 /40 /50 □ /73 /79 □ /71 /32 /61 /34 □ /68 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 □ /68 /36 /59 /78 /63 /34 /61 /34 /64 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □ /83 /79 □ /84 /57 □ /61 /55 /34 □ /34 /67 /61 /56 /58 /34 □ /57 /56 /61 /34 □ /57 /60 /37 /37 /56 /72 /56 /34 /67 /61 /63 /69 □ /57 /61 /32 /62 /56 /63 /56 /85 /34 /64 /86 □ □ □ □ □□ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □ /68 /79 □ /73 /58 /34 □ /32 /63 /63 □ /77 /61 /36 /58 /59 /66 /32 /61 /34 /58 □ /91 /32 /72 /56 /63 /56 /61 /56 /34 /57 □ /66 /36 /58 /92 /56 /67 /33 □ /78 /58 /36 /78 /34 /58 /63 /69 /86 □□ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □ /71 /79 □ /84 /57 □ /61 /55 /34 □ /36 /78 /34 /58 /32 /61 /56 /67 /33 □ /93 /32 /56 /67 /61 /34 /67 /32 /67 /72 /34 □ /73 /33 /58 /34 /34 /59 /34 /67 /61 □ /36 /37 □ /77 /61 /36 /58 /59 /66/32 /61 /34 /58 □ /91 /32 /72 /56 /63 /56 /61 /56 /34 /57 □ /58 /34 /72 /36 /58 /64 /34 /64 □ /66 /56 /61 /55 □ /61 /55 /34 □ /65 /34 /36 /58 /33 /34 /61 /36 /66 /67 □ /68 /36 /60 /67 /61 /69□ /94 /34 /33 /56 /57 /61 /34 /58 □ /36 /37 □ /71 /34 /34 /64 /57 □ /90 /37 /37 /56 /72 /34 /86 □ □ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □ /88 /79 □ /84 /37 □ /57 /36 /95 □ /56 /67 /64 /56 /72 /32 /61 /34 □ /61 /55 /34 □ /94 /34 /72 /36 /58 /64 /34 /64 □ /71 /34 /34 /64 □ /83 /36 /36 /92 □ /96 □ /31 /32 /33 /34 /81 □ /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □ /91 /79 □ /73 /58 /34 □ /61 /55 /34 /58 /34 □ /32 □ /31 /71 /91 □ /32 /67 /64 □ /71 /97/65 □ /32 /57 /98 /62 /60 /56 /63 /61 □ /36 /37 □ /61 /55 /34 □ /57 /56 /61 /34 /99 /57 □ /77/61 /36 /58 /59 /66 /32 /61 /34 /58 □ /93 /32 /67 /32 /33 /34 /59 /34 /67 /61 □ /77 /69 /57 /61 /34 /59 □ /32 /61 /61 /32 /72 /55 /34 /64 □ /61 /36 □ /61 /55 /56 /57 □ /37 /36 /58 /59 /86 □ □ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □ /65 /79 □ /84 /57 □ /61 /55 /34 □ /32 /57 /98 /62 /60 /56 /63 /61 □ /56 /67 □ /57 /61 /32 /61 /34 □ /78 /63 /32 /67 /34 □ /72 /36 /36 /58 /64 /56 /67 /32 /61 /34 /57 /95 □ /89 /73 /71 □/100 /101 □ /56 /67 /61 /34 /58 /67 /32 /61 /56 /36 /67 /32 /63 □ /37 /34 /34 /61 /86 □ □ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □ □ /47 /48 /48 /39 /49 /38 /47 /50 /45 /102 /41 □ /38 /42 /52 /45 /49 /51 /49 /38 /47 /45 /49 /40 /50 □ /84 □ /55 /34 /58 /34 /62 /69 □ /72 /34 /58 /61 /56 /37 /69 □ /61 /55 /32 /61 □ /32 /63 /63 □ /72 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 /95 □ /64 /34 /74 /34 /63 /36 /78 /59 /34 /67 /61/95 □ /32 /67 /64 /103 /36 /58 □ /58 /34 /98 /64 /34 /74 /34 /63 /36 /78 /59 /34 /67 /61 □ /55 /32 /57 □ /62 /34 /34 /67 □ /72 /36 /59 /78 /63 /34 /61 /34 /64 □ /56 /67 □ /32 /72 /72 /36 /58/64 /32 /67 /72 /34 □ /66 /56 /61 /55 □ /61 /55 /34 □ /68 /36 /60 /67 /61 /69 □ /58 /34 /76 /60 /56 /58 /34 /59 /34 /67 /61 /57 □ /32 /67 /64 □ /61 /55 /34 □ /68 /36 /60 /67 /61 /69 □ /32 /78 /78 /58 /36 /74 /34/64 □ /78 /58 /36 /75 /34 /72 /61 □ /32 /78 /78 /63 /56 /72 /32 /61 /56 /36 /67 □ /32 /67 /64 □ /32 /63 /63 □ /56 /67 /37 /36 /58 /59 /32 /61 /56 /36 /67 □ /56 /57 □ /61 /58 /60 /61 /55 /37/60 /63 □ /61 /36 □ /61 /55 /34 □ /62 /34 /57 /61 □ /36 /37 □ /59 /69 □ /92 /67 /36 /66 /63 /34 /64 /33 /34 /79 □ □ /84 □ /58 /34 /32 /63 /56 /85 /34 □ /61 /55 /32 /61 □ /84 □ /32 /59 □ /67 /36 /66 □ /58 /34 /57 /78/36 /67 /57 /56 /62 /63 /34 □ /37 /36 /58 □ /61 /55 /34 □ /63 /36 /67 /33 /98 /61 /34 /58 /59 □ /59 /32 /56 /67 /61 /34 /67 /32 /67 /72 /34 □ /36 /37 □ /32 /63 /63 □ /57 /61 /36 /58 /59 /66/32 /61 /34 /58 □ /59 /32 /67 /32 /33 /34 /59 /34 /67 /61 □ /37 /32 /72 /56 /63 /56 /61 /56 /34 /57 □ /60 /67 /61 /56 /63 □ /32 □ /61 /58 /32 /67 /57 /37 /34 /58 □ /36 /37 □ /36 /66 /67 /34 /58 /57 /55 /56 /78□ /55 /32 /57 □ /62 /34 /34 /67 □ /32 /78 /78 /58 /36 /74 /34 /64 □ /62 /69 □ /61 /55 /34 □ /65 /34 /36 /58 /33 /34 /61 /36 /66 /67 □ /68 /36 /60 /67 /61 /69 □ /77 /61 /36 /58 /59 /66 /32/61 /34 /58 □ /71 /56 /74 /56 /57 /56 /36 /67 /79 □ □ □ □ /73 /78 /78 /63 /56 /72 /32 /67 /61 /99 /57 □ /31 /58 /56 /67 /61 /34 /64 □ /89 /32 /59 /34 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □ □ □ /73 /78 /78 /63 /56 /72 /32 /67 /61 /99 /57 □ /77 /56 /33 /67 /32 /61 /60 /58 /34 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □ □ □ /71 /32 /61 /34 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □ □ □ □ □ □ Page 75 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Appendix D As-Built Certification Form Page 76 of 229 /0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □ □/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□ /31 /32 /33 /34 /35 /36 /37 /38 □ /39 /40 /41 /38 /36 /42 /36 /43 /44 /38 /36 /45 /46 □ /47 /45 /41 /48 □ □ □ □ □ □ □ □ □ □ □ □ □ /49 /44 /50 /40 □ /51 □ /45 /42 □ /52 □ □ /54 /55 /56 /57 /58 /55 /59 /56 /60 /61 □ /62 /56 /63 /61 /59 /64 □ /65 /55 /66 /67 /57 /59 /68/55 /61 /59 □ /56 /69 □ /70 /63 /71 /72 /73 /74 □ /75 /55 /57 /76 /73 /74 /55 /77 □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ /80 /81 /82 /83 /84 /85 /86 /87 □ /89 /90 /91 /87 /85 /92 /85 /93 /94 /87 /85 /95 /96 □ /97 /95 /91 /98 □ □ /99 /44 /38 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /49 /40 /41 /48 /36 /38 □ /102 /45 /103 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101□ □ /104 /44 /105 □ /106 /44 /107 □ /102 /45 /103 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /49 /41 /45 /108 /40 /43 /38 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /31 /109 /109 /41 /40 /32 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /104 /110 /107 /40 □ /45 /42 □ /47 /44 /43 /36 /37 /36 /38 /110 /100 □ /99 /40 /38 /40 /46 /38 /36 /45 /46 /100 □ □ □ □ □ □ □ □ □ □/112 /40 /38 /40 /46 /38 /36 /45 /46 /100 □ □ □ □ □□ □ □ □ □/113 /46 /42 /36 /37 /38 /41 /44 /38 /36 /45 /46 /100 □ □ □ □ □□ □ /114 /38 /41 /35 /43 /38 /35 /41 /40 □ /112 /40 /42 /40 /41 /40 /46 /43 /40 □ /102 /45 /103 □ /45 /46 □ /49 /37 /44 /46 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /99 /40 /32 /36 /50 /46 /40 /109 □ /114 /38 /45 /41 /44 /50 /40 □ /115 /45 /37 /35 /48 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /31 /32 □ /114 /38 /45 /41 /44 /50 /40 □ /115 /45 /37 /35 /48 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /116 /90 /91 /98 /94 /96 /90 /96 /87 □ /116 /95 /95 /86 □ /117 /86 /90 /118 /94 /87 /85 /95 /96 □ /119 /120 /90 /87 /90 /96 /87 /85 /95 /96 □ /116 /95 /96 /121 □ /122 /96 /86 /123 /124 □ □ /99 /40 /32 /36 /50 /46 /40 /109 □ /49 /40 /41 /48 /44 /46 /40 /46 /38 □ /49 /45 /45 /37 □ /125 /37 /40 /126 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /31 /32 □ /49 /40 /41 /48 /44 /46 /40 /46 /38 □ /49 /45 /45 /37 □ /125 /37 /40 /126 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /120 /90 /86 /90 /94 /81 /90 □ /120 /94 /87 /90□ /127 /87 /95 /91 /98 □ /117 /118 /90 /96 /87 □ /117 /128 /85 /81 /87 /85 /96 /129 □ /130 /90 /81 /85 /129 /96 /90 /121 □ /80 /81 /82 /83 /84 /85 /86 /87 □ /131 □ /132 /90 /94 /91 □ □ □ □ /133 /134 □ /132 /90 /94 /91 □ □ □ □ /131 /135 □ /132 /90 /94 /91 □ □ □ □ /133 /134 /134 □ /132 /90 /94 /91 □ □ □ □ □ /136/94 /87 /90 /91 □ /137 /84 /94 /86 /85 /87 /123 □ /122 /91 /85 /92 /85 /93 /90 □ /99 /40 /32 /36 /50 /46 /40 /109 □ /138 /35 /38 /37 /40 /38 □ /99 /40 /126 /36 /43 /40 □ /104 /110 /107 /40 □ /44 /46 /109 □ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □ □ /104 /110 /107 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /125 /37 /40 /126 /44 /38 /36 /45 /46 /100□ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /31 /32 /33 /34 /35 /36 /37 /38 □ /138 /35 /38 /37 /40 /38 □ /104 /110 /107 /40 □ /44 /46 /109 □ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □ □ /104 /110 /107 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /125 /37 /40 /126 /44 /38 /36 /45 /46 /100□ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /127 /87 /95 /91 /98 /139 /94 /87 /90 /91 □ /130 /85 /118 /85 /81 /85 /95 /96 □ /140 /9 /141 □ /142 /12 /28 /13 /21 /29 □ /142 /12 /28 /22 /21 /11 /12 /28 /20 /8 □ /143 /5 /144 □ /145 /27 /22 /8 /146 /8 /13 □ /145 /21 /22 /8 /8 /21 □ /147 /8 /12 /22 /26 /8 /21 /12 /24 /13 /148 □ /145 /142 □ /5 /144 /1 /1 /15 □ Page 77 of 229 /0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □ □/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□ /31 /32 /33 /34 /35 /36 /37 /38 □ /39 /40 /41 /38 /36 /42 /36 /43 /44 /38 /36 /45 /46 □ /47 /45 /41 /48 □ □ □ □ □ □ □ □ □ □ □ □ □ /49 /44 /50 /40 □ /51 □ /45 /42 □ /52 □ /53 /54 /55 /56 /57 /54 /58 □ /60 /61 /62 /63 /64 /62□ /65 /40 /32 /36 /50 /46 /40 /66 □ /67 /35 /38 /37 /40 /38 □ /65 /40 /68 /36 /43 /40 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ □ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /31 /32 /33 /34 /35 /36 /37 /38 □ /67 /35 /38 /37 /40 /38 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ □ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /75 /64 /76 /77 /78 /79 /57 /54 /58 □ /77 /54 □ /60 /80 /64 /54 /81 /63 /77 /82 □ /60 /61 /62 /63 /64 /62 □ /65 /40 /32 /36 /50 /46 /40 /66 □ /67 /35 /38 /37 /40 /38 □ /65 /40 /68 /36 /43 /40 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ □ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /31 /32 /33 /34 /35 /36 /37 /38 □ /67 /35 /38 /37 /40 /38 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ □ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ □ □ /83 /84 /75 □ /85 /60 □ /86 /32 □ /38 /87 /40 □ /88 /89 /89 □ /70 /40 /44 /41 □ /44 /46 /66 □ /51 /90 □ /87 /45 /35 /41 □ /32 /38 /45 /41 /48 □ /32 /44 /42 /40 /37 /70 □ /66 /36 /32 /43 /87 /44 /41 /50 /40 /66/91 □ □ □ /31 /41 /40 □ /40 /46 /40 /41 /50 /70 □ /66 /36 /32 /32 /36 /71 /44 /38 /45 /41 /32 /92 □ /87 /40 /44 /66 /93 /44 /37 /37 /32 □ /44 /46 /66 □ /32 /71 /36 /37 /37 /93 /44 /70 /32 □ /71 /41 /45/71 /40 /41 /37 /70 □ /43 /45 /46 /32 /38 /41 /35 /43 /38 /40 /66 □ /44 /46 /66 □ /36 /46 /32 /38 /44 /37 /37 /40 /66 □ /44 /43 /43 /45 /41 /66 /36 /46 /50 □ /38 /45 □ /38 /87 /40 □ /71 /37 /44 /46 /32 /91 □ □ □ /31 /41 /40 □ /40 /48 /94 /44 /46 /95 /48 /40 /46 /38 /32 □ /44 /46 /66 /96 /45 /41 □ /40 /97 /43 /44 /68 /44 /38 /40 /66 □ /32 /37 /45 /71 /40 /32 □ /32 /38 /44 /94 /37 /40 □ /44 /46 /66 □/43 /45 /68 /40 /41 /40 /66 □ /36 /46 □ /44 □ /32 /35 /36 /38 /44 /94 /37 /40 □ /48 /44 /46 /46 /40 /41 □ /44 /32 □ /38 /45 □ /71 /41 /40 /68 /40 /46 /38 □ /40 /41 /45 /32 /36 /45 /46 /91 □ □ □ /86 /32 □ /38 /87 /40 □ /32 /38 /45 /41 /48 /93 /44 /38 /40 /41 □ /66 /41 /44 /36 /46 /44 /50 /40 □ /32 /70 /32 /38 /40 /48 □ /98 /71 /36 /71 /40 /32 /92 □ /43 /44 /38 /43 /87 □ /94 /44 /32/36 /46 /32 /92 □ /40 /38 /43 /99/100 □ /43 /45 /46 /32 /38 /41 /35 /43 /38 /40 /66 □ /36 /46 □ /44 /43 /43 /45 /41 /66 /44 /46 /43 /40 □ /93 /36 /38 /87 □ /38 /87 /40 □ /44 /71 /71 /41 /45 /68 /40 /66 □ /71 /37 /44 /46 /32 /91 □ □ □ /101 /44 /32 □ /44 /43 /43 /35 /48 /35 /37 /44 /38 /40 /66 □ /32 /40 /66 /36 /48 /40 /46 /38 □ /94 /40 /40 /46 □ /41 /40 /48 /45 /68 /40 /66 □ /42 /41 /45 /48 □ /38 /87 /40 □ /32 /38 /45 /41/48 /93 /44 /38 /40 /41 □ /66 /40 /38 /40 /46 /38 /36 /45 /46 □ /44 /46 /66 □ /41 /40 /38 /40 /46 /38 /36 /45 /46 □ /71 /45 /46 /66 /32 /91 □ □ □ /31 /41 /40 □ /40 /46 /40 /41 /50 /70 □ /66 /36 /32 /32 /36 /71 /44 /38 /45 /41 /32 /92 □ /66 /41 /44 /36 /46 /44 /50 /40 □ /32 /38 /41 /35 /43 /38 /35 /41 /40 /32 /92 □ /44 /46 /66 □ /32 /38/45 /41 /48 □ /37 /36 /46 /40 /32 □ /42 /41 /40 /40 □ /45 /42 □ /32 /40 /66 /36 /48 /40 /46 /38 □ /44 /46 /66 □ /66 /40 /94 /41 /36 /32 /91 □ □ □ /101 /44 /32 □ /38 /87 /40 □ /66 /36 /32 /38 /35 /41 /94 /40 /66 □ /44 /41 /40 /44 □ /42 /45 /41 □ /38 /87 /40 □ /40 /46 /38 /36 /41 /40 □ /32 /36 /38 /40 □ /44 /43 /87 /36 /40 /68 /40 /66□ /102 /89 /103 □ /32 /38 /44 /94 /36 /37 /36 /104 /44 /38 /36 /45 /46 □ /98 /71 /40 /41 /48 /44 /46 /40 /46 /38 □ /50 /41 /45 /35 /46 /66 □ /43 /45 /68 /40 /41 □ /44 /46 /66 □ /102 /89 /103 □ /32 /38 /44 /94 /37 /40 □ /71 /40 /41 □ /32 /105 /35 /44 /41 /40 □ /70 /44 /41 /66 /100 /91 □ □ □ □ □ □ □ □ □ Page 78 of 229 /0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □ □/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□ /31 /32 /33 /34 /35 /36 /37 /38 □ /39 /40 /41 /38 /36 /42 /36 /43 /44 /38 /36 /45 /46 □ /47 /45 /41 /48 □ □ □ □ □ □ □ □ □ □ □ □ □ /49 /44 /50 /40 □ /51 □ /45 /42 □ /51 □ /52 /53 /54 /55 □ /57 /58 /59 /58 /60 /53 /61 /58 /62 □ /63 /64 /61 /58 /65 /59 /66 /53 /67 /54 □ /68 /65 /58 /69□ /70 /71/72 □ /73 /67 /64 /74 /58 /65 □ /63 /64 /61 /58 /65 /59 /66 /53 /67 /54 □ /68 /65 /58 /69 □ /75 /69 /76 /65 /58 /54 /77 □ /63 /64 /61 /58 /65 /59 /66 /53 /67 /54 □ /68 /65 /58 /69 □/75 /54 /78 /79 □ /80 /55 /79 /77 □ □ □ □ □ □ □ □ □ □ □ /34 /81 □ /82 /37 /44 /43 /36 /46 /50 □ /48 /81 □ /82 /41 /45 /42 /40 /32 /32 /36 /45 /46 /44 /37 □ /32 /38 /44 /48 /82 □ /44 /46 /83 □ /32 /36 /50 /46 /44 /38 /35 /41 /40 □ /45 /46 □ /38/84 /36 /32 □ /82 /44 /82 /40 /41 /85 □ /86 □ /43 /40 /41 /38 /36 /42 /81 □ /38 /84 /44 /38 □ /38 /84 /36 /32 □ /32 /38 /45 /41 /48 /87 /44 /38 /40 /41 □ /48 /44 /46 /44 /50 /40 /48 /40 /46/38 □ /42 /44 /43 /36 /37 /36 /38 /81 □ /44 /46 /83 □ /36 /38 /32 □ /44 /32 /32 /45 /43 /36 /44 /38 /40 /83 □ /32 /38 /41 /35 /43 /38 /35 /41 /40 /32 □ /44 /41 /40 □ /43 /45 /46 /32 /38 /41 /35 /43/38 /40 /83 □ /44 /43 /43 /45 /41 /83 /36 /46 /50 □ /38 /45 □ /38 /84 /40 □ /44 /82 /82 /41 /45 /88 /40 /83 □ /83 /40 /32 /36 /50 /46 □ /45 /46 □ /42 /36 /37 /40 □ /87 /36 /38 /84 □ /89 /40 /45 /41 /50 /40 /38 /45 /87 /46 □ /39 /45 /35 /46 /38 /81 □ /44 /46 /83 □ /90 /39 /91 /92 /93 /39 /94 □ □ /86 □ /42 /35 /41 /38 /84 /40 /41 □ /43 /40 /41 /38 /36 /42 /81 □ /38 /84/44 /38 □ /44 /37 /37 □ /38 /84 /40 □ /83 /41 /44 /36 /46 /44 /50 /40 □ /44 /41 /40 /44 /32 □ /83 /40 /32 /36 /50 /46 /40 /83 □ /38 /45 □ /83 /41 /44 /36 /46 □ /38 /45 □ /38 /84 /36 /32□ /82 /45 /46 /83 □ /36 /46 □ /42 /44 /43 /38 □ /83 /45 /85 □ /44 /46 /83 □ /38 /84 /40 □ /45 /35 /38 /42 /37 /45 /87 □ /42 /41 /45 /48 □ /38 /84 /40 □ /82 /45 /46 /83 □ /36 /32 □ /40 /95 /35 /44 /37 □/38 /45 □ /45 /41 □ /37 /40 /32 /32 □ /38 /84 /44 /46 □ /48 /44 /96 /36 /48 /35 /48 □ /44 /37 /37 /45 /87 /44 /97 /37 /40 □ /42 /45 /41 □ /38 /84 /40 □ /98 /85 □ /99 /100 □ /44 /46 /83□ /98 /101 □ /81 /40 /44 /41 □ /38 /87 /40 /46 /38 /81 /33 /42 /45 /35 /41 □ /84 /45 /35 /41 □ /32 /38 /45 /41 /48 □ /40 /88 /40 /46 /38 /32 /94 □ □ /86 □ /42 /35 /41 /38 /84 /40 /41 □ /43 /40 /41 /38/36 /42 /81 □ /38 /84 /44 /38 □ /38 /84 /40 □ /43 /45 /82 /81 □ /45 /42 □ /32 /38 /44 /48 /82 /40 /83 □ /43 /44 /37 /43 /35 /37 /44 /38 /36 /45 /46 /32 □ /44 /38 /38 /44 /43 /84 /40 /83 □/84 /40 /41 /38 /45 □ /87 /44 /32 □ /35 /32 /40 /83 □ /38 /45 □ /83 /40 /38 /40 /41 /48 /36 /46 /40 □ /38 /84 /40 □ /31 /32 /33 /34 /35 /36 /37 /38 □ /90 /38 /45 /41 /44 /50 /40 □ /102 /45 /37 /35 /48 /40 /32 /85□ /83 /40 /38 /40 /46 /38 /36 /45 /46 □ /45 /42 □ /38 /84 /40 □ /98 /85 □ /99 /100 /85 □ /98 /101 □ /81 /40 /44 /41 □ /38 /87 /40 /46 /38 /81 /33 /42 /45 /35 /41 □ /84 /45 /35 /41 □ /32/38 /45 /41 /48 □ /40 /88 /40 /46 /38 /32 □ /44 /46 /83 □ /38 /84 /40 □ /41 /40 /95 /35 /36 /41 /40 /83 □ /41 /40 /37 /40 /44 /32 /40 □ /45 /42 □ /38 /84 /40 □ /42 /36 /41 /32 /38 □ /42 /37 /35 /32 /84 □/42 /45 /41 □ /87 /44 /38 /40 /41 □ /95 /35 /44 /37 /36 /38 /81 □ /38 /41 /40 /44 /38 /48 /40 /46 /38 /94 □ □ /47 /45 /41 □ /35 /46 /83 /40 /41 /50 /41 /45 /35 /46 /83 □ /83 /40 /38 /40 /46/38 /36 /45 /46 □ /44 /46 /83 □ /87 /44 /38 /40 /41 □ /95 /35 /44 /37 /36 /38 /81 □ /48 /44 /46 /44 /50 /40 /48 /40 /46 /38 □ /32 /81 /32 /38 /40 /48 /32 /85 □ /86 □ /43 /40 /41 /38 /36 /42 /81 □ /38 /84 /44 /38 □ /38 /84/40 /81 □ /87 /40 /41 /40 □ /83 /40 /32 /36 /50 /46 /40 /83 □ /44 /46 /83 □ /36 /46 /32 /38 /44 /37 /37 /40 /83 □ /82 /40 /41 □ /38 /84 /40 □ /48 /44 /46 /35 /42 /44 /43 /38 /35 /41 /40 /41/103 /32 □ /41 /40 /43 /45 /48 /48 /40 /46 /83 /44 /38 /36 /45 /46 /32 □ /44 /46 /83 □ /38 /84 /40 □ /44 /82 /82 /41 /45 /88 /40 /83 □ /82 /37 /44 /46 /32 /94 □ □ □ □ /72 /66 /104 /105 /69 /55 /67 /65 /58 □ /69 /105 /62 □ /72 /58 /69 /60 □ □ □ □/106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 □ □ □ □ □ □ □ □ □ □ □ /93 /46 /50 /36 /46 /40 /40 /41 □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106/106 □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ /39 /45 /48 /82 /44 /46 /81 □ /107 /44 /48 /40 □ □ □ □ /73 /53 /55 /58 /108 □ /109 /110 □ /112 /113 /114 □ /115 /116 /117 /118 /114 /119 /112 □ /113 /120 /121 □ /122 /117 /116 /114 □ /112 /113 /120 /123 □ /117 /123 /114 □ /124 /112 /117 /116 /122 /125 /120 /112 /114 /116 □ /126/120 /123 /120 /127 /114 /122 /114 /123 /112 □ /128 /120 /119 /129 /130 /129 /112 /131 □ /117 /123 □ /112 /113 /114 □ /121 /129 /112 /114 □ /112 /113 /114 /123 □ /114 /120 /119 /113 □ /110 /120 /119 /129 /130 /129 /112 /131 □ /125/129 /130 /130 □ /116 /114 /132 /133 /129 /116 /114 □ /120 □ /121 /114 /115 /120 /116 /120 /112 /114 □ /110 /117 /116 /122 /134 □ □ /135 /112 /112 /120 /119 /113 □ /121 /112 /120 /122 /115 /114 /136 □ /135 /121 /137 /138 /133 /129 /130 /112 □ /115 /130 /120 /123 /121 □ /120 /123 /136 □ /119 /120 /130 /119 /133 /130 /120 /112 /129 /117 /123 /121 □ /112 /117 □ /112/113 /129 /121 □ /136 /117 /119 /133 /122 /114 /123 /112 /134 □ □ Page 79 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Appendix E Georgetown County As-Built Survey Requirements Page 80 of 229 /0 /1 /2 /3 /4 /5 /6 /7 □ /9 /4 /10 /11 /12 /13 □ /15 /12 /16 /4 /5 /10 /12 /17 /12 /18 /7 /1 /19□ /20 /21 /22 /23 /24 □ /26 □ /27 /28 /29 /30 /31 □ /32 /33 /28 /31 /34 /28 /29 /35 □ /36 /29 /37 /38 /23 /39 /22 /28 /21 /29 □ /39 /30 /29 /29 /21 /22 □ /40 /23 □ /37 /39 /41 /23 /34 /33 /31/23 /34 □ /33 /29 /22 /28 /31 □ /30 □ /27 /28 /29 /30 /31 □ /42 /22 /21 /43 /44 /45 /30 /22 /23 /43 □ /36 /29 /37 /38 /23 /39 /22 /28 /21 /29 □ /28 /37 □ /30 /39 /39 /23 /38 /22 /23 /34 /46 □ /47 /48 □ /50 /51 /52 □ /53 /52 /54 /55 /56 /57 /57 /52 /52 □ /58 /51 /59 /60 /60 □ /53 /54 /61 /62 /56 /63 /52 □ /59 /64 □ /65 /59 /58 /66 /67 /68 /56 /60 /57 /69 □ /63 /54 /59 /70 /56 /64/71 □ /53 /54 /52 /53 /59 /54 /52 /63 □ /59 /64 /63 □ /72 /52 /54 /57 /56 /73 /56 /52 /63 □ /67 /74 □ /59 □ /75 /56 /72 /52 /64 /58 /52 /63 □ /76 /68 /67 /60 /56 /72 □ /75 /59 /64 /63 □ /77 /68 /54 /62 /52 /74 /61 /54 /48 □ /78 □ /72 /52 /54 /57 /56 /73 /56 /72 /59 /57 /56 /61 /64 □ /58 /57 /59 /57/52 /55 /52 /64 /57 □ /61 /64 □ /57 /51 /52 □ /53 /60 /59 /64 /58 □ /55 /68 /58 /57 □ /67 /52 □ /58 /56 /71 /64 /52 /63 □ /67 /74 □ /57 /51 /52 □ /53 /54 /61 /79 /52 /72 /57 /80 /58 □ /81 /52 /71 /56 /58 /57 /52 /54 /52 /63 □ /82 /64 /71 /56 /64 /52 /52 /54 □ /56 /64 /63 /56/72 /59 /57 /56 /64 /71 □ /57 /51 /59 /57 □ /57 /51 /52 □ /58 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /55 /59 /64 /59 /71 /52 /55 /52 /64 /57 □ /58 /74 /58 /57 /52 /55 □ /70 /56 /60 /60 □ /73 /68 /64 /72 /57 /56 /61 /64 □ /56 /64 □ /59 /72 /72 /61 /54 /63 /59 /64 /72 /52 □ /70 /56 /57 /51 □/57 /51 /52 □ /59 /53 /53 /54 /61 /62 /52 /63 □ /63 /52 /58 /56 /71 /64 □ /53 /60 /59 /64 /58 /48 □ □ /83 /48 □ /84 /64 □ /60 /56 /52 /68 □ /61 /73 □ /72 /61 /64 /57 /61 /68 /54 /58 □ /61 /62 /52 /54 □ /57 /51 /52 □ /52 /64 /57 /56 /54 /52 □ /58 /56 /57 /52 □ /58 /53 /61 /57 □ /52 /60/52 /62 /59 /57 /56 /61 /64 /58 □ /70 /56 /60 /60 □ /67 /52 □ /59 /72 /72 /52 /53 /57 /52 /63 □ /59 /60 /61 /64 /71 □ /70 /56 /57 /51 □ /57 /51 /52 □ /63 /52 /58 /56 /71 /64 □ /52 /64 /71 /56 /64 /52 /52 /54 /80 /58 □ /59 /63 /63 /56 /57 /56 /61 /64 /59 /60 □ /72 /52 /54 /57 /56 /73 /56 /72 /59 /57 /56 /61 /64□ /57 /51 /59 /57 □ /57 /51 /52 □ /58 /56 /57 /52 □ /63 /54 /59 /56 /64 /58 □ /57 /61 □ /57 /51 /52 □ /58 /56 /57 /52 /80 /58 □ /58 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /55 /59 /64 /59 /71 /52 /55 /52 /64 /57 □ /58 /74 /58 /57 /52 /55 □ /56 /64 □ /59 /72 /72 /61 /54 /63 /59 /64 /72 /52 □ /70/56 /57 /51 □ /57 /51 /52 □ /53 /52 /54 /55 /56 /57 /57 /52 /63 □ /63 /52 /58 /56 /71 /64 /48 □ /85 /48 □ /84 /64 /72 /60 /68 /63 /52 □ /71 /54 /59 /63 /52 /58 /86 /72 /61 /64 /57 /61 /68 /54 /58 /86 /63 /52 /53 /57 /51 /58 □ /73 /61 /54 □ /53 /61 /64 /63 /87 /58 /88 /48 □ /89 /54 /59 /56/64 /59 /71 /52 □ /53 /61 /64 /63 /58 □ /58 /51 /59 /60 /60 □ /58 /51 /61 /70 □ /72 /61 /64 /57 /61 /68 /54 /58 /90 □ /57 /61 /53 □ /61 /73 □ /67 /59 /64 /91 /90 □ /64 /61 /54 /55 /59 /60 □ /70 /59 /57 /52 /54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /57 /51 /52 □/58 /56 /63 /52 □ /58 /60 /61 /53 /52 □ /61 /73 □ /57 /51 /52 □ /53 /61 /64 /63 /87 /58 /88 /90 □ /53 /54 /61 /62 /56 /63 /52 □ /53 /61 /64 /63 □ /63 /59 /57 /59 □ /57 /59 /67 /60 /52 □ /56 /64 /63 /56 /72 /59 /57 /56 /64 /71 □ /57 /51 /52 □ /53 /61 /64 /63 □ /64 /59 /55 /52 /90 □ /57/61 /53 □ /61 /73 □ /67 /59 /64 /91 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /67 /61 /57 /57 /61 /55 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /64 /61 /54 /55 /59 /60 □ /70 /59 /57 /52 /54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /59 /64 /63 □ /58 /57 /59 /71 /52□ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /73 /61 /54 □ /57 /51 /52 □ /83 /90 □ /47 /92 /90 □ /83 /93 /90 □ /59 /64 /63 □ /47 /92 /92 □ /74 /52 /59 /54 □ /83 /94 □ /51 /61 /68 /54 □ /58 /57 /61 /54 /55 □ /52 /62 /52 /64 /57 /58 /48 □ /94 /48 □ /82 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 □ /61 /73 □ /59 /60 /60 □ /58 /57 /54 /68 /72 /57 /68 /54 /52 /58 /90 □ /56 /64 /72/60 /68 /63 /56 /64 /71 □ /76 /56 /53 /52 □ /59 /64 /63 □ /61 /54 /56 /73 /56 /72 /52 □ /56 /64 /62 /52 /54 /57 /58 □ /59 /64 /63 □ /63 /56 /59 /55 /52 /57 /52 /54 /58 /90 □ /95/52 /56 /54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 /90 □ /81 /56 /58 /52/54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 /90 □ /82 /55 /52 /54 /71 /52 /64 /72 /74 □ /58 /53 /56 /60 /60 /70 /59 /74 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64/58 /56 /61 /64 /58 /90 □ /75 /61 /72 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /56 /64 /62 /52 /54 /57 /58 □ /73 /61 /54 □ /59 /60 /60 □ /53 /56 /53 /52 /58 □ /63 /56 /58 /72 /51 /59 /54 /71 /56 /64 /71 □ /56 /64 /57 /61 □ /57 /51 /52 □ /53 /61 /64 /63 /48 □ /93 /48 □ /89 /54 /59 /56 /64 /59 /71 /52 □ /53 /56 /53 /52 /58 □ /70 /56 /57 /51 □ /58 /56 /96 /52 /90 □ /55 /59 /57 /52 /54 /56 /59 /60 /90 □ /60 /52 /64 /71 /57 /51 /90 □ /58 /60 /61 /53/52 /90 □ /59 /64 /63 □ /56 /64 /62 /52 /54 /57 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 /48 □ /97 /48 □ /89 /54 /59 /56 /64 /59 /71 /52 □ /52 /59 /58 /52 /55 /52 /64 /57 /58 □ /70 /56 /57 /51 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 /48 □ /98 /48 □ /99 /64 /63 /52 /54 □ /58 /61 /55 /52 □ /72 /56 /54 /72 /68 /55 /58 /57 /59 /64 /72 /52 /58 □ /59 □ /54 /52 /62 /56 /58 /52 /63 □ /53 /61 /64 /63 □ /54 /61 /68 /57 /56 /64 /71 □/72 /59 /60 /72 /68 /60 /59 /57 /56 /61 /64 /58 □ /70 /56 /60 /60 □ /67 /52 □ /54 /52 /100 /68 /52 /58 /57 /52 /63 □ /56 /73 □ /57 /51 /52 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /61 /54 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 □ /61 /73 □ /57 /51 /52 □ /58 /57/54 /68 /72 /57 /68 /54 /52 /58 □ /60 /56 /58 /57 /52 /63 □ /59 /67 /61 /62 /52 □ /63 /61 □ /64 /61 /57 □ /55 /59 /57 /72 /51 □ /57 /51 /61 /58 /52 □ /68 /58 /52 /63 □ /56 /64 □ /57 /51 /52 □ /59 /53 /53 /54 /61 /62 /52 /63 □ /63 /52 /58 /56 /71 /64 □ /53 /60 /59 /64 /58 /48 □ □ /101 /48 □ /77 /57 /54 /52 /52 /57 □ /64 /59 /55 /52 /58 /90 □ /60 /61 /57 □ /64 /68 /55 /67 /52 /54 /58 /90 □ /60 /61 /57 □ /60 /56 /64 /52 /58 /90 □ /67 /61 /68 /64 /63 /59 /54 /74 □ /59/64 /63 □ /53 /51 /59 /58 /52 □ /60 /56 /64 /52 /58 /48 □ □ /102 /48 □ /76 /59 /62 /52 /55 /52 /64 /57 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /60 /61 /64 /71 □ /57 /51 /52 □ /72 /52 /64 /57 /52 /54 /60 /56 /64 /52 □ /59 /64 /63 □ /52 /63 /71/52 □ /61 /73 □ /53 /59 /62 /52 /55 /52 /64 /57 □ /59 /57 □ /55 /59 /103 /56 /55 /68 /55 □ /47 /92 /92 /66 /73 /61 /61 /57 □ /56 /64 /57 /52 /54 /62 /59 /60 /58 /48 □ □ /47 /92 /48 □ /89 /54 /59 /56 /64 /59 /71 /52 □ /63 /56 /57 /72 /51 /52 /58 □ /59 /64 /63 □ /58 /70 /59 /60 /52 /58 □ /70 /56 /57 /51 □ /72 /54 /61 /58 /58 □ /58 /52 /72 /57 /56 /61 /64 □/52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /57 □ /55 /59 /103 /56 /55 /68 /55 □ /47 /92 /92 /66 /73 /61 /61 /57 □ /56 /64 /57 /52 /54 /62 /59 /60 /58 /48 □ /47 /47 /48 □ /76 /54 /61 /62 /56 /63 /52 □ /59 /64 □ /78 /68 /57 /61 /104 /78 /89 □ /63 /56 /71 /56 /57 /59 /60 □ /89 /95/105 □ /59 /64 /63 □ /76 /89 /106 □ /73 /56 /60 /52 □ /61 /73 □/57 /51 /52 □ /59 /58 /66 /67 /68 /56 /60 /57 □ /63 /54 /59 /70 /56 /64 /71 □ /61 /64 □ /77 /104 □ /77 /57 /59 /57 /52 □ /76 /60 /59 /64 /52 □ /104 /61 /61 /54 /63 /56 /64 /59 /57 /52 □ /77 /74 /58 /57 /52 /55 □ /107 /78 /89 □ /101 /85 □ /89 /59 /57 /68 /55 /48 □ □ /47 /83 /48 □ /76 /54 /61 /62 /56 /63 /52 □ /59 □ /72 /61 /53 /74 □ /61 /73 □ /57 /51 /52 □ /77 /104 /89 /108 /50 □ /54 /52 /60 /52 /59 /58 /52 □ /60 /52 /57 /57 /52 /54 □ /70 /51 /52 /54/52 □ /52 /64 /72 /54 /61 /59 /72 /51 /55 /52 /64 /57 □ /53 /52 /54 /55 /56 /57 /87 /58 /88 □ /70 /52 /54 /52 □ /56 /58 /58 /68 /52 /63 /48 □ /47 /85 /48 □ /78 /63 /63 /56 /57 /56 /61 /64 /59 /60 □ /56 /64 /73 /61 /54 /55 /59 /57 /56 /61 /64 □ /55 /59 /74 □ /67 /52 □ /64 /52 /72 /52 /58 /58 /59 /54 /74 □ /59 /58 □ /63 /52 /52 /55/52 /63 □ /59 /53 /53 /54 /61 /53 /54 /56 /59 /57 /52 □ /67 /74 □ /105 /52 /61 /54 /71 /52 /57 /61 /70 /64 □ /104 /61 /68 /64 /57 /74 □ /77 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /109 /59 /64 /59 /71 /52 /54 /48 □ /99 /53 /61 /64 □ /72 /61 /55 /53 /60 /52 /57 /56 /61 /64 □ /61 /73 □ /57 /51 /52 □ /70 /61 /54 /91 /90 □ /59 □ /73 /56 /64 /59 /60 □ /56 /64 /58 /53 /52 /72 /57 /56 /61 /64 □ /70 /56 /60/60 □ /67 /52 □ /72 /61 /64 /63 /68 /72 /57 /52 /63 □ /67 /74 □ /57 /51 /52 □ /89 /52 /53 /59 /54 /57 /55 /52 /64 /57 □ /57 /61 □ /63 /52 /57 /52 /54 /55 /56 /64 /52 □ /56 /73 □ /57 /51 /52 □ /72 /61 /55 /53 /60 /52 /57 /52 /63 □ /70 /61 /54 /91 □ /51 /59 /58 □ /67 /52 /52 /64 □ /72 /61 /64 /58 /57 /54 /68 /72 /57 /52/63 □ /56 /64 □ /59 /72 /72 /61 /54 /63 /59 /64 /72 /52 □ /70 /56 /57 /51 □ /57 /51 /52 □ /77 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /76 /60 /59 /64 /48 □ /110 /111 /112 /113 /114 □ /116 /117 /118 /119 /120 /121 /122 /112 □ /117 /120 /123 /124 /113 /125 □ /126 /127 /128 □ /129 /111 /123 □ /126 /127 /126 /122 /125 /117 /121 /117 □ /130 /120 /117 /112 □ /119 /113 □ /117 /120 /119 /130/121 /112 /112 /113 /128 □ /126 /127 /128 □ /126 /131 /131 /113 /132 /112 /113 /128 □ /119 /125 □ /112 /133 /113 □ /134 /113 /132 /126 /123 /112 /130 /113 /127 /112 □ /119 /113 /135 /111 /123 /113 □ /110 /111 /112 /121 /131 /113 □ /111 /135 □ /136 /113 /123 /130 /121 /127 /126 /112 /121 /111 /127 □ /137 /110 /138 /136 /139 □ /121 /117 □ /117 /120/119 /130 /121 /112 /112 /113 /128 /48 □ □ Page 81 of 229 Stormwater Design Manual July 2025 Georgetown County, South Carolina Appendix F SCDES Notice of Intent (NOI) Page 82 of 229 NOTICE OF INTENT (NOI) For Coverage(s) of Primary Permittees Under South Carolina NPDES General Permit For Stormwater Discharges From Construction Activities SCR100000 (Maintain As Part of On-Site SWPPP) For Official Use Only File Number: ______________________ Permit Number: SCR10_____________ Submittal Package Complete: ___________________ Submission of this Notice of Intent constitutes notice that the Applicant identified in Section II intends to be authorized as a Primary Permi ttee in the state of South Carolina under NPDES General Permit SCR1000000. Fees required for review and NPDES coverage of each application type are as listed on page 2 of the Instructions. Date: ____________________________ Check if project is receiving SCIIP Funding Grant #: Project/Site Name: _____________________________________________________ County: ______________________________________ (Modification or Change of Information Only) Prior Approved NPDES Permit or File Number: ___________________________________ Do you want this project to be considered for the Expedited Review Program (ERP)? Yes or No (See instructions) I. Notice of Intent (NOI) Application Type(s) A. Project (Application/Review) Type(s) (Select ALL that apply): New Project (Initial Notification) Ongoing Project: Permitted or Un-Permitted Late Notification Low I mpact Development (LID) or Project Design Above Regulatory Requirements New Owner/Operator or Company Name Change (see instructions, attach Form A (Transfer of Ownership)) Major Modification: (see instructions, attach Form B (Major Modifications)) MS4 Project Review Bureau of Coastal Management (BCM) Review Change of Information/Other (Specify): __________________________________________________________________ B. If Applicable, identify the entity designated as MS4 Reviewer and MS4 Operator (i.e., Lexington County, City of Greer, etc.): MS4 Reviewer_________________________________ MS4 Operator ___________________________________ II. Primary Permittee Information Change of Information Person or Company If a Company, are you a Lending Institution or Government Entity? Company EIN (If applicable): EIN: _______________________ A. Primary Permittee Name: ______________________________________________________________________________________ Mailing Address: ___________________________________ City: ________________________State: ______ Zip: ______________ Phone: ____________________ Fax: ____________________Email Address: _____________________________________________ B. Contact /ODSA Name (If different from above OR if owner is a company): _________________________________________________ . Mailing Addres s: ____________________________________City: _______________________State: ______ Zip: _______________ Phone: ____________________ Fax: ____________________Email Address: _____________________________________________ C. Property Owner Name (If different from above): ___________________________________________________________________ Mailing Address: ___________________________________ City: _______________________State: ______ Zip: _______________ Phone: ____________________ Fax: ____________________Email Address: _____________________________________________ III. Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP) Preparer Information Change of Information A, C-SWPPP Preparer Name: ______________________________________________________________________________________ B. Registered Professional Engineer Landscape Architect Tier B Land Surveyor S. C. Registration #: ____________ C. Company/Firm Name: ___________________________________________________________ S. C. COA # : __________________ Mailing Addres s: ____________________________________City: ______________________State: ______ Zip: ________________ Phone: ___________________ Fax: _____________________Email Address: ____________________________________________ IV. Project/Site Information Change of Information A. Type of Construction Activity(ies) (Select ALL that apply): Commercial Industrial Institutional Mass Grading Linear Utility/Infrastructure Residential: Single-family Residential: Multi-family Multi-use (Commercial & Residential) Site Preparation (No New Impervious Area) Other (Specify) ______________________________________________ B. Site Address/Location (street address, nearest intersection, etc.) _____________________________________________ City/Town (If in limits): _______________________________________________________ Zip Code: _________________________ Latitude: ________’____” N Longitude: - ________’____” W (Source): GPS Web Site: _______________________________ Tax Map Number (s) (List all): ______________________________________________________________________________________ DES 2617 (01/2025) Page 83 of 229 C. Is this site located on Indian Land? Yes No D. Proposed Start Date: ____________________ Proposed Completion Date: ____________________ E. Disturbed Area (nearest tenth of an acre): ________________ Total Area (acres): ________________ F. Modification Only:(nearest tenth of an acre): Disturbed Area: Current (Approved) Area: _______________ Disturbed Area Change (Increase Only): __________________ Total Disturbed Area (After Change): _________________ G. Is this project part of a Larger Common Plan for Development or Sale (LCP)? Yes No LCP/ Overall Development Name: ____________________________________ Check here if this is the First Phase. Previous State Permit/File Number: ____________________ Previous NPDES Coverage Number: SCR10 ______________ H. Any Flooding Problems exist downstream of or adjacent to this site? Yes No (If yes, provide detailed description of flooding problems and applicable floodway/flood zone information in the C-SWPPP). I. Active 6&'(6 Warning Notice, Notice to Comply or Notice of Violation for this site or LCP? Yes No J. List Relevant State and Federal Environmental Permits or Approvals applied for or obtained for this site (e.g., RCRA, USACOE, Nationwide, etc.). If None, list None. _______________________________________________________________________ K. Any Waiver(s)/Variances/Exceptions Requested for this Project? (If yes, identify below and include Waiver Request and Justifications in the C-SWPPP for each proposed request). 1. Small Co nstruction Activity Waiver(s) From NPDES permitting (Section 1.4 & Appendix B)? Yes No If yes, Identify requested waiver: Rainfall Erosivity Waiver TMDL Waiver Equivalent Analysis Waiver 2. Detention Waiver (72-302(B)? Yes No 3. Other (Specify): ____________________________________________ V. Waterbody Information (Attach additional sheet(s) as needed) Change of Information A. Receiving Waterbody(s) (RWB) Information (List the nearest and next nearest receiving waterbodies to which the sites stormwater discharges will drain. If stormwater discharges drain to multiple waterbodies, list all such waterbodies). 1. Name of Receiving Waterbodies (RWB) 2. Distance to RWB (feet) 3. Classification of RWB a. Nearest: _______________________________________ b. Next Nearest: __________________________________ c. Coastal Zone ONLY: Coastal Receiving Water (CRW): ________________________ Not Applicable d. Other Waterbodies: _____________________________ B. Waters of the U.S. / State Information (Attach additional sheet(s) as needed) Waters of the U.S./ State 1. On the site? 2. Delineated/ Identified? 3. Impacts? 4. Amount of impacts a. Jurisdictional wetlands Yes No Yes No Yes No _____ Ac b. Non-jurisdictional wetlands Yes No Yes No Yes No _____ Ac c. Other Water(s): _________________________ Yes No Yes No Yes No _____ Ac ______ Feet d. Coastal Zone ONLY: Direct Critical Area Yes No Yes No Yes No _____ Ac ______ Feet 5. If yes for impacts in B.3, describe each impact and activity, and list all permits (e.g., USACOE Nationwide Permit, SCDES General Permit) and certifications that have been applied for or obtained for each impact: _____________________________________________________________________________________________________________________ C. S.C. Navigable Waters (SCNW) Information (Section 2.6.5) The Department will address any issues related to State Navigable Waters’ Program under SC Regulation 19-450 during the review of the C-SWPPP for activities that will NOT require a 404 permit or a 401 certification. (Attach additional sheet(s) as needed). 1. Are S. C. Navigable Waters (SCNW) on the site: Yes No a. If no, do not complete this question. Proceed to Section D (Impaired Waterbodies). b. If yes, provide the name of S.C. Navigable Waters (SCNW) on the site: ________________________________________ 2. If yes for C.1, will construction activities cross over or occur in, under, or thru the SCNW? Yes No If yes, describe SCNW activities (e.g., road crossing, sub-aqueous utility line, temporary or permanent structures, etc.) and proceed to Section C.3: _______________________________________________________________________________________ 3. Identify permits providing coverage of SCNW activities proposed for your site. If NONE, list none. Permits/Certifications Permit or Certification No. Corresponding Covered SCNW Activity(ies) a.SCDES General/ Other SCDES Permit b. USACOE 404 Permit or 401 Certification c. SCNW Permit If applied for or issued, identify Date applied for or issued: ________________ All Activities or Some Activities (Describe): d. If a SCNW Permit has NOT been applied for provide an additional plan sheet that shows plan and profile views (drawn to scale) of the SCNW and associated activities. Include a description of all proposed activities on this plan. DES 2617 (01/2025) Page 84 of 229 D. Impaired Waterbodies Information (Attach additional sheet(s) as needed) 1. 303(d) Listed Impaired Waterbodies a. Name of Nearest SCDES Water Quality Monitoring Stations (WQMS)(s) that receives stormwater from your construction site and/or thru an MS4 and the Name of the Corresponding Waterbody? Nearest SCDES WQMS(s) Corresponding Waterbody b.Is this WQMS(s) listed on the most current 303(d) List? If No, proceed to Section 2 of this table. If Yes, complete items c thru f. c. List the po llutant(s) identified as “CAUSES” of the impairment d. Will any pollutants c ausing the impairment be present in your site’s construction stormwater discharges? e. If yes fo r d, list the “USE SUPPORT” impairment(s) affected by the pollutant(s) identified in c. Yes No Yes No Yes No Yes No Yes No Yes No f. If yes for d above, will use of the BMPs proposed for your project ensure the site’s discharges will NOT contribute to or cause further WQS violations for the impairment(s) listed in c? Yes No (NOTE: If no for f, this site is NOT eligible for coverage und er the CGP). See Instructions. 2. TMDL Impaired Waterbodies a. Name of Nearest SCDES Water Quality Monitoring Stations (WQMS)(s) that receives stormwater from your construction site and/or thru an MS4? b. Has a TMDL(s) been developed for this WQMS(s)? If No, identify as such below and proceed to Section VI. If Yes, complete items c thru f of this table. c. If yes for b, what pollutants are listed as “CAUSES” or causing the impairment? d. If yes for b, has the standard been “ATTAINED” or “ Fully Supported” for the impairment(s)? e. If no for d (Not Attained), will any pollutants causing the impairment be present in your site’s construction stormwater discharges? Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No Yes No f. If yes for e above, are your discharges consistent with the assumptions and requirements of the TMDL(s)? Yes No (NOTE: If no for f, this site is NOT eligible for coverage under the CGP). See Instructions. VI. Signatures and Certifications DO NOT SIGN IN BLACK INK! Read the Certifications below (in entirety). Provide date, printed name , and signatures below. If you are a New Owner/Operator, as Primary Permittee you must also sign and date the applicable Comprehensive SWPPP Acceptance & Compliance Agreement below. C-SWPPP PREPARER: “One copy of the C-SWPPP, all specifications and supporting calculations, forms, and reports are herewith submitted and made a part of this application. I have placed my signature and seal on the design documents submitted signifying that I accept responsibility for the design of the system. Further, I certify to the best of my knowledge and belief that the design is consistent with the requirements of Title 48, Chapter 14 of the Code of Laws of SC, 1976 as amended, pursuant to Regulation 72-300 et seq. (if applicable), and in accordance with the terms and conditions of SCR100000.” (This should be the person identified in Section III). _________________________________ ____________________________ ______________________________ Printed Name of CISWPPP Preparer Signature of CISWPPP Preparer S. C. Registration # PRIMARY PERMITTEE: “I or I (on behalf of my company and its contractors and agents), as the case may be, certify under penalty of law that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate, and complete. I understand that SCDES enforcement actions may be taken if the terms and conditions of the C-SWPPP are not met and I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations.” “I or I (on behalf of my company and its contractors and agents), as the case may be, also hereby certify that all land-disturbing construction and associated activity pertaining to this site shall be accomplished pursuant to and in keeping with the terms and conditions of the approved plans and SCR100000. I also certify that a responsible person will be assigned to the project for day-to-day control. I hereby grant authorization to the to S. C. Department of Environmental Services (SCDES) and/or the local implementing agency the right of access to the site at all times for the purpose of on site inspections during the course of construction and to perform maintenance inspections following the completion of the land-disturbing activity.” (See Section 122.22 of S.C. Reg. 61I9 for signatory authority information.) Having understood the above information, I am signing this certification as Primary Permittee to the aforementioned NPDES general permit.” _______________________________________ ______________________________________ Printed Name of Primary Permittee Title/Position _________________________________________ __________________________________________ Signature of Primary Permittee Date Signed DES 2617 (01/2025) Page 85 of 229 NPDES CGP FEE SCHEDULE A (All Counties EXCEPT Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper) The schedule should be attached to SCDES Form 2617. Do not send payment in window envelope. DO NOT MAIL CASH. SCDES will notify the Project Owner/ Operator if the subm itted check or credit card payment cannot be processed. The review clock will start when acceptable payment is received. 1. Identify ( √) the Project Review Type(s) Enter NPDES Coverage Fee of $125 in the right-hand column if any of the following project/review types apply to this application. Proceed to Item 2. (√) NPDES Coverage Fee a. Project or LCP (Item IV.G) that will ultimately disturb one (1) acre or more Note: If your project will ultimately disturb less than one (1) acre AND is NOT a part of a Larger Common Plan, coverage under SCR100000 is not required; see https://des.sc.gov/sites/des/files/Library/D-2628.pdf (Notification Form for Sites Disturbing Less Than 1-Acre Not Part of a Larger Common Plan, Non-Coastal County” b. New Owner/Operator (Transfer of Ownership)/Company Name Change ($125 NPDES Coverage fee is required by the Department for Transfers of Ownership and Company Name Changes) c. Unpermitted Ongoing Project or Late Notification d. MS4 Project Review (Item I.A and I.B) ($125 payable to Department thru MS4 Reviewer) e. Other (Specify): _________________________________________________________ $ ________. 00 2. Determine the Project Review Fees (Review fees cannot exceed $2000 for a project) PROJECT OR LCP THAT WILL ULTIMATELY DISTRUB ONE (1) ACRE OR MORE (√) Review Fees a. Enter the disturbed area (Item IV.E) for this project. Proceed to Items 2.b and 2.c. ________ (Nearest tenth of an acre) b. Will this project or LCP (Item IV.G) ultimately disturb more than 1.0 acres Yes No c. Is this project exempt from S. C. Reg. 72-300 et seq.? Yes No 1. If this project will not ultimately disturb more than 1.0 acre, and is not part of an LCP, your project is automatically covered under this permit and the NPDES coverage fee and review fee are not required. See the BOW-SPWS for “Less Than 1-Acre of Land Disturbance – Non- Coastal Counties”. 2. If this project will ultimately disturb more than 1.0 acre, proceed to Item 2.d. d. Enter the project review fees (based on $100/disturbed area) in the right-hand column. (Multiply the disturbed area (Item 2.a) by $100/disturbed area). If the disturbed area for this project (Item 2.a.) totals 20.0 acres or more, enter $2000 in the right-hand column. Review fees cannot exceed $2000 for a project. $ ________. 00 4. Identify the Method of Payment: Payment by Check: Attach a signed and dated check payable to SCDES to the front of this Fee Schedule. Please note tha t all checks must be less than 30 days old and m ust be for the ent ire required fees. Paym ent by Credit Card: (Check here if you wish to pay via credit card using the on-line payment system). The Department will contact you to pro vide instructions and the invoice numb er necessary for online payment. Please provide an e-mail address where the invoice number may be sent: ________________________________ For official use only: Invoice Number ___________________ 3. Total Required Fees Add the values in the right-hand columns of Items 1 and 2.d. Proceed to Item 4. (The Department will not review this project until all required fees are received). $ ________. 000 DES 2617 (01/2025) Page 86 of 229 NPDES CGP FEE SCHEDULE B (ONLY for Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper Counties) Submit payment for NPDES Coverage fees only to SCDES. The schedule should be attached to SCDES Form 2617. Do not send payment in window envelope. DO NOT MAIL CASH. SCDES will notify the Project Owner/ Operator if the check or credit card payment cannot be processed. The review clock will start when acceptable payment is received and after the project is deemed consistent with the S.C. Coastal Zone Management Plan. 1. Identify ( √) the Project/Review Types (NOTE: You may ONLY select Item 1.a OR 1.b BELOW). Enter NPDES coverage fee of $125 in the right- hand column if any of the following project/review types apply to this application. Proceed to Item 2. (√) NPDES Coverage Fee(s) a. Project or LCP that is located within ½ mile of CRW (Item V.A) that will ultimately disturb more than 0.5 acres (if select a, do not select b) b. Project or LCP that is NOT located within ½ mile of CRW (Item V.A) that will ultimately disturb one (1) acre or more (if select b, do not select a) c. New Owner/Operator (Transfer of Ownership)/Company Name Change ($125 NPDES Coverage fee is required by the Department for Transfers of Ownership and Company Name Changes) d. Unpermitted Ongoing Project or Late Notification e. MS4 Project Review (Item I.A and I.B) f. Other (Specify): _________________________________________________________ $ ________. 00 2. Determine the Project Review Fees (Review fees cannot exceed $2000 for a project). NOTE: COMPLETE ITEM 2.a BELOW. COMPLETE EITHER SECTION 3 OR SECTION 4. DO NOT COMPLETE BOTH SECTIONS. a. Enter the disturbed area (Item IV.E) for this project. Proceed to Item 3 OR Item 4. _______ (nearest tenth of an acre) 3. PROJECT OR LCP LOCATED WITHIN ½ MILE OF A CRW (ITEM V.A) (√) Review Fees a. Will this project or LCP (Item IV.G) ultimately disturb more than 0.5 acres? Yes No b. Is this project exempt from S. C. Reg. 72-300 et seq.? Yes No 1. If this project will NOT ultimately disturb more than 0.5 acres and is not part of an LCP , your project is automatically covered under this permit and the NPDES coverage fee and review fee are not required. See section 1.3.1.B. See the BOW-SPWS for “Less Than 1-Acre of Land Disturbance - Coastal Counties”. 2. If this project or LCP will ultimately disturb more than 0.5 acres, proceed to Item 3.c. c. Enter the project review fees (based on $100/ disturbed acre) in the right-hand column. (Multiply the disturbed area (Item 2.a.) by $100/disturbed area). If the disturbed area for this project (Item 2.a.) totals 20.0 acres o r more, enter $2000 in the right-hand column. Review fees cannot exceed $2000 for a project. Proceed to item 3.d $ ________. 00 d. Total Required Fees (Coastal Project located WITHIN ½ mile of a CRW (Item V.A) Add the values in the right-ha nd columns of Items 1 and 3.c . (The Department will not review this project until all required fees are received). Proceed to Item 5. $ ________. 00 4. PROJECT OR LCP NOT LOCATED WITHIN ½ MILE OF A CRW (ITEM V.A) (√) Review Fees a. Will this project or LCP (Item IV.G) ultimately disturb one (1) acre or more? Yes No b. Is this project exempt from S. C. Reg. 72-300 et seq.? Yes No 1. If this project will NOT ultimately disturb one (1) acre or more, and is not part of an LCP , coverage under SCR100000 is NOT required; see the BOW-SPWS for “Less Than 1-Acre of Land Disturbance - Coastal Counties”. 2. If this project or LCP will ultimately disturb one (1) acre or more, proceed to Item 4.c. c. Enter the project review fees (based on $100/ disturbed acre) in the right-hand column. (Multiply the disturbed area (Item 2.a.) by $100/disturbed area). If the disturbed area for this project (Item 2.a.) totals 20.0 acres or more, enter $2000 in the right-hand column. Review fees cannot exceed $2000 for a project. Proceed to item 4.d. $ ________. 00 d. Total Required Fees (Coastal Project NOT located WITHIN ½ mile of a CRW (Item V.A) Add the values in the right-hand columns of Items 1 and 4.c. (The Department will not review this project until all required fees are received). Proceed to Item 5. $ ________. 00 Identify the Method of Payment:5. Payment by Check: (Attach a signed and dated check payable to SCDES to the front of th is fee schedule. All checks must be less than 30 days old and must be for the entire amount of required fees). . Pa yment by Credit Card: (Check here if you wish to pay via credit card using the on-line payment system). The Department will contact you via e-mail to provide instructions and the invoice num ber necessary for online payment. Please provide an e-mail address where the invoice number may be sent: ________________________________________ For official use only: Invoice Number ______________________________________________________________________ DES 2617 (01/2025) Page 87 of 229 Instructions for Completing the Notice or Intent (NOI) If you are uncertain whether you need to obtain coverage under the NPDES General Permit for Stormwater Discharges from Construction Activities, SCR100000 (CGP), if you cannot access the websites listed on the NOI and instructions, or if you have any other questions, contact the Stormwater Permitting Section (SWP) at (803) 898-4300 or Coastal Stormwater Permitting Section (CSWP) at (843) 953-0200. Projects located in the S.C. Coastal Zone (SCCZ—Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper counties) are reviewed by CSWP. Please see the Bureau of Water, Stormwater Permitting website (BOW- SPWS): https://des.sc.gov/Stormwater for guidance and additional information regarding the CGP. Who Must File a NOI: • If S.C. Department of Transportation (SCDOT) is the Primary Permittee (Owner/ Operator), this NOI form (Form 2617) should not be used. • The Owner/ Operator of a single project or larger common plan for development or sale (LCP—see item IV.G of instructions) that will ultimately disturb 1 acre or more (all counties). • In the SCCZ, the Owner/Operator of a single project or LCP that is located within ½ mile of a coastal receiving water (CRW) (See item V.A of the instructions) and will ultimately disturb more than 0.5 acres. • See the BOWISPWS for “Less Than 1-Acre of Land Disturbance - Non-Coastal Counti es” and “Less Than 1-Acre of Land Disturbance - Coastal Counties”. Where to File: See the BOWISPWS for a current list of the areas that are reviewed by Municipal Separate Storm Sewer System (MS4) operators and entities that have delegated review authority. For projects in these areas, the initial submittal should be made to the MS4 operator; if initial submittal is made to SCDES for projects in these areas, the review process may be delayed. Please contact the appropriate entity for additional information and requirements; for example, the MS4 operator may require that a different application form be submitted. If a project crosses jurisdictional boundaries (e.g., sewer line in Greenville County and the city of Mauldin), then submittals to all appropriate MS4 operators, delegated entities, and SCDES must be coordinated. Projects Located in the SCCZ All Other Areas SCDES—Bureau of Water Coastal Stormwater Permitting Section 1362 McMillan Ave., Suite 400 Charleston, S.C. 29405 SCDES—Bureau of Water Stormwater Permitting Section 2600 Bull Street Columbia, SC 29201I1708 Submittal Package for SWP and CSWP: •When SCDES performs a full technical review, you must include the original, signed NOI form, appropriate fee schedule (A B) or with required fees, one (1) copy of the Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP), and one (1) copy of all other supporting documentation with the initial submittal. For projects in the non coastal counties disturbing greater than or equal to 1 acre and less than or equal to 2 acres, one (1) copy of the C-SWPPP and one (1) copy of supporting documentation can be submitted with the initial submittal. In the SCCZ, applications for Coastal Zone Consistency certification are to be filed with requests for NPDES construction coverage and will then be routed internally to the Bureau of Coastal Management (BCM) for review. BCM submittal requirements can be located at: https://des.sc.gov/CZC •When a regulated MS4 or entity implementing Regulation 72I300 performs the technical review, you must include a copy of the MS4 approved NOI form or MS4 approved application, the $125 NPDES fee, and one (1) copy of the MS4 approval. In the SCCZ,applications for Coastal Zone Consistency certification are to be filed with requests for NPDES construction coverage and will then be routed internally to BCM for review. •For projects ultimately disturbing more than 1 acres, the checklist must be completed and attached when SCDES reviews your C- SWPPP. In the SCCZ, for projects ultimately disturbing more than 0.5 acres and located within ½ mile of a CRW, the checklist must be completed and attached. See BOWISPWS for the most current version of the checklist. If this project will NOT ultimately disturb more than 0.5 acres (Coastal Counties) or more than 1.0 acre (Non-Coastal Counties) AND is not part of an LCP, your project is automatically covered under this permit and the NPDES coverage fee and review fee are not required. See the BOWISPWS for “Less Than 1-Acre of Land Disturbance - Coastal Counties AND “Less Than 1-Acre of Land Disturbance – Non-Coastal Counties. •For Modification projects where SCDES performs a technical review, see Section I of the instructions and Form B. Complete the applicable sections of the NOI Form. Complete the Form B Checklist. Submit an original, signed NOI form, appropriate fee schedule (C) with required fees, one (1) copy of SWPPP revisions, and one (1) copy of all other supporting documentation, including necessary engineering calculations. No review clock is required for Modification reviews. Authorizatio n to discharge is granted based on the timeframes specified in the table below. For project sites located in the SCCZ, the timeframes p rovided below do not commence until a Coastal Zone Consistency determination has been issued for the site. Review Type Allotted Review Time Frame Regulated MS4 or entity implementing Regulation 72-300 7 business days of SCDES receipt of a complete NOI and fee payment. SCDES (when construction site is subject to State C-SWPPP reviews) 20 business days of SCDES receipt of a complete NOI and fee payment. S. C. Coastal Zone (SCCZ) Requirements: For projects that are located within ½ mile of a CRW and involve greater than 0.5 acres of land disturbance, a registered engineer, landscape architect, or Tier B surveyor must prepare, amend when necessary, certify, and stamp the C-SWPPP as required and allowed by the qualified individual’s respective act and regulations. Regulation 72-307(C)(5)(g) establishes additional requirements for projects located in the SCCZ. The additional water quality measures are outlined in Chapter III, Section XIII of the South Carolina Coastal Zone Management Program, as refined available at https://des.sc.gov/CZMP DES 2617 (01/2025) Page 88 of 229 Fee Schedules: Make sure to answer all applicable questions on the appropriate Fee Schedule. Complete Fee Schedule A for Non-Coastal projects; Schedule B for Coastal projects. Attach Form A, as required, for Transfer of Ownership. Attach Form B for major modifications to a prior approved project with Fee Schedule C if SCDES reviews your modification. Office Mechanics and Filing: The original NOI form for projects located outside of MS4 areas and supporting documentation will be kept in the Central Office files (hard copy or digitized copy) in accordance with the Retention Schedule. Date: Enter today’s date. Check if project is receiving SCIIP Funding: Check if project is receiving SCIIP funding and add grant number from RIA. Project/Site Name: The Project/ Site Name should be a unique or distinguishing name (e.g., not Proposed Subdivision). NOTE: SCDES must be notified in writing if the Project/ Site Name changes. County: If the project is in multiple counties, list the county in which the majority of the site is located. If part of the project is in the SCCZ, then list the coastal county in which the majority of the site is located and submit the project to CSWP; see the “Where to File” section. List the other counties in which the site is located in the C-SWPPP. Prior Approved NPDES Permit Number (Major Modification or Change of Information Only): Provide the NPDES permit number (SCR number)or File Number previously assigned to the project or LCP. Expedited Review Program (ERP): For additional information about ERP, see the ERP website https://des.sc.gov/ environment/water/swater/expeditedReview.htm. SCDES will notify the Project Owner/ Operator if the project is selected for review in the ERP. There are additional required fees for participation in this program; these ERP fees should not be submitted until SCDES has notified the Project Owner/ Operator that the project was selected for participation in the ERP. In the SCCZ, please note that projects impacting Geographic Areas of Particular Concern (GAPCs) and/or wetlands may not eligible for participation. Consult BCM staff. I. Notice of Intent (NOI) Application Type(s) ( See Section 2.4 of CGP for submission deadlines and notification requirements) A. Project (Application) Type I Select ALL applicable application types that best describe your project or application. Section 2 of the Construction General Permit (CGP) may be reviewed for further information on each type of application listed in this section. As an example, if your project is one that is a new startup, then “New Project” should be selected. If your project is a new startup that will be located in Beaufort County, that will also be expedited, then “New Project”, “OCRM Project Review”, and “Expedited Review Program” should each be selected to describe your application. To determine if the project design is considered to be above regulatory requirements or Low Impact Development, see the “Expedited Review Standard Operating Procedures” document. If none of the application types listed in this section apply or clearly define the intent of your project, select “Other” and provide specific details that clearly describe the intent of your NOI application. NOTE: SCDES must be notified in writing within fourteen (14) business days of a new Owner (person, lending institution, government institution, etc.) taking title to or ownership of a prior approved ongoing NPDES construction project/site. A new Property Owner must complete all applicable sections of Form A (Transfer of Ownership) and submit this form to the Department or respective MS4 with the NOI application. Written notification is also required when the Owner or Developer’s company name changes for a prior approved construction permit. NOTE: Major Modifications allowed by the Department are listed in Section 3.1.7 of the CGP. If your project is a major modification, complete Form B, Fee Schedule C, and applicable sections of the NOI per directions identified on Form B. Please note that Section V (Waterbody Information) of the prior approved NOI must be reviewed for changes prior to submitting any modification request to the Department. If changes have occurred, identify as Change of Information on the NOI form and provide the revised information in this section. Attach a detailed Narrative and revised C-SWPPP documents to the major modification request. A. MS4 Reviewer and MS4 Operator I If this project is located inside a Municipal Separate Storm Sewer System (MS4) and must be reviewed and approved by a MS4 entity prior to submission to SCDES, then select “MS4 Project Review” as application type in Item A and provide the names of the entities that will perform the review and the MS4 Operator. Urbanized area boundary maps are available at http://cfpub.epa.gov/npdes/stormwater/urbanmapresult.cfm?state=SC. See the following website for information about MS4s: https://des.sc.gov/MS4s. Note: Some MS4s have increased their review jurisdiction boundaries beyond the original urbanized area map. Please confirm with the appropriate MS4 regarding review jurisdiction. II. Primary Permittee Information Identify whether the Primary Permittee is a person or a company. If a company, identify if it is a lending institution or government entity. Provide the Employer Identification Number (EIN) as established by the U.S. Internal Revenue Service for the company. The EIN is commonly referred to as the taxpayer ID. If the company doe s not have an EIN (e.g., single member LLC, sole proprietorship). DO NOT list a Social Security number DES 2617 (01/2025) Page 89 of 229 A. Primary Permittee Name - Provide the complete, legal name of the person or entity (company) that will be the Primary Permittee (Owner/Operator, O/O) for the project. If a person, provide the Title or Position. If a company, provide the complete, legal name of the company. Do not list the D/B/A (Doing Business As) name. NOTE: If S.C. Department of Transportation (SCDOT) is the O/O , this NOI form (Form 2617) should NOT be used. Provide the complete mailing address of the person/company identified in II.A as the Primary Permittee. B. Contact/ODSA Name – Complete if different from II. A or O/O is a company. Provide the complete legal name of the person identified as the Contact or Operator of Daily Site Activities (ODSA) for the project. This can be someone other than the person that has signatory authority for the company. Often the Contact person is also referred to as the ODSA. Provide the complete mailing address for the person, other than the permittee, the Department may contact. This address can be different from the mailing address entered for the O/O. C. Property Owner Name – If different from II.A or B, list the complete, legal name of the current Property Owner(s) of the site. Enter the complete mailing address for the Property Owner. NPDES coverage will be issued to the Primary Permittee identified in Section II.A, not the Property Owner, unless same entity. If there are multiple Property Owners, attach additional sheets with all information requested in Section II.C. III. Comprehensive Stormwater Pollution Prevention Plan (CISWPPP) Preparer Information A. CISWPPP Preparer Name – Provide the name of the C-SWPPP Preparer for this project. B. Registered Professional – Identif y whether the C-SWPPP Preparer is a Registered South Carolina Professional Engineer, Tier B Surveyor, or Landscape Architect. For projects disturbing more than 2 acres, the C-SWPPP preparer must be one of the listed professionals or federal government employee as described in Title 40, Chapter 22,and as required and allowed by the qualified individual’s respective act and regulations. In the SCCZ, proje cts that are located within ½ mile of a CRW and that involve greater than 0.5 acres of land disturbance, the C-SWPPP preparer must be one of the listed professionals or federal government employee as described in Title 40, Chapter 22, and as required and allowed by the qualified individual’s respective act and regulations. C. Company/Firm Name I Provide th e complete, legal name of the company and S.C. Certificate of Authorization (S.C. COA number). Enter the complete mailing address. SCDES may contact the C-SWPPP Preparer via email. See the following websites for information about COA requirements for Landscape Architecture firms http://www.dnr.sc.gov/land/LandscArch/LAlicense.html and Engineering and Surveying firms http://www.llr.state.sc.us/POL/Engineers/. Enter N/A for S.C. COA if the firm is not required to have a COA. IV. Project/Site Information A. Type of Construction Activity (ies) - Select A LL activity types that best describe the development proposed for the site. “Ins titutional” includes schools and other publicly owned projects, except linear projects. “Site Preparation” includes clearing, grubbing, and grading only; no new impervious a reas should be proposed if this activity type is selected. If none describe the development, then select “Other” and list the activity. B. Site Address/Location I List the site address. If the site address is unknown, list the road name(s) on which the site is located, the nearest intersection, or other detailed description of the site location. List a city/town only if the site is within the city/ town limits. List zip code (if known). Provide the latitude/longitude and tax map numbers. See the following website for assistance in obtaining latitude/ longitude coordinates: http://www.epa.gov/tri/report/siting_tool/index.htm . Latitude (from 32° to 35°) and longitude (-78° to -83°) should be for the center of the site. Minutes (’) and seconds (”) should be from 0 to 59. Identify the lat/long data source. C. Indian Lands – Identify if this site is located on Indian lands. D. Proposed Start Date/Completion Date – Provide proposed project start and completion dates. E. Disturbed Area/Total Area - Enter the disturbed area for the project and the total area for the site. The disturbed areas must be rounded to the nearest tenth of an acre . For subdivisions, if the exact build-out is not known, the disturbed area can be estimated using the following equation: Disturbed area= 2(Maximum Footprint of House)(# of lots) + Road/ RightIofIWay areas + Other easements/ disturbance. NOTE: Provide written notification if the actual disturbed area exceeds the disturbed area on the approved NOI. F. Modification Only: Change to Disturbed Area – If your mod ification to a prior approved project will increase or decrease the disturbed area, complete this section and see Section I of the Instructions. Enter the current approved disturbed area and proposed increase (+) or decrease (-) to the disturbed area. If no change, enter 0.0. Enter the new total disturbed area (after change). Round each entry to the nearest tenth of an acre. G. Larger Common Plan for Development or Sale (LCP ) - The plan in LCP is “broadly defined as any announcement or piece of documentation (including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning request, computer design, etc.) or physical demarcation (including boundary signs, lot stakes, surveyor markings, etc.) indicating construction activities may occur on a specific plot.” [63 Federal Register No. 128, July 6, Page 6 1998, p. 36491] For example, if master calculations have been prepared and/ or submitted for an entire site, then all phases and parcels at that site would be considered part of an LCP. If the site is part of a subdivision, industrial park, commercial park, etc., then it is considered to be part of an LCP. List a unique, distinguishing LCP/ Overall Development name. This name should not reference a specific phase. This LCP/ Overall Development name should also be listed on all NOIs for future projects that are part of this LCP, including subsequent phases. Check the box if this is the first phase of the LCP. List the previous state permit/ file number and previous NPDES coverage number if applicable. (DO NOT enter SCR1 00000). If not known, contact the Department for assistance. DES 2617 (01/2025) Page 90 of 229 H. Flooding Problems – Identify whether flooding problems exist on the site, or downstream or adjacent to the site. If yes, provide detailed explanation of the extent and impact in your C-SWPPP. NOTE: All C-SWPPP applications must include a Floodway Map/FEMA Flood Insurance Map (See Checklist) with an outline of the project boundary on the map. NOTE: The Department does not regulate the placement of fill in floodplains. Contact local city or county official. I. Active SCDES Warning Notice/Notice to Comply/Notice of Violation – Select yes if SCDES has issued a Warning Notice, Notice to Comply, or Notice of Violation for the site or any site within the LCP. Provide additional information about the Notice (e.g., Order number) and a copy of correspondence with SCDES regarding the Notice in your C-SWPPP. J. State and Federal Environmental Permits or Approvals – List relevant state and federal permits applied for. See §122.21(f) of S.C. Regulation 61-9 https://des.sc.gov/sites/des/files/Library/Regulations/R.30-9.pdf for a list of permits, approvals, and programs that should be considered. If inaccurate, NPDES coverage may be invalid. K. Waiver(s) - Identify any waivers requested for your project or construction site. Provide details and required justifications in the C-SWPPP. V. Waterbody Information A. Receiving Waterbody(s) (RWB) Information 1. The Nearest receiving waterbody (RWB) is the nearest Waters of the State (WoS). See definition in §122.2 of S.C. Regulation 61-9 - https://des.sc.gov/sites/des/files/Library/Regulations/R.30-9.pdf to which the site’s stormwater discharges will drain. The nearest RWB must be listed in reference to a named waterbody, if the RWB is unnamed. For example, if the site’s stormwater discharges drain to a stream on the site, then the nearest RWB would be the stream. If the stream is not named, then determine the nearest named waterbody (e.g., Grove Creek) into which the stream will flow and list the nearest RWB as a tributary to the named waterbody (e.g., Tributary to Grove Creek). Then, the Next Nearest named RWB would be Grove Creek. If the site’s stormwater discharges drain to multiple waterbodies, then list all such waterbodies; attach additional sheets, if necessary. 2. Provide the distance, in feet to each receiving waterbody. 3. Provide the classification for each named waterbody. See S.C. Regulation 61-69 (https://des.sc.gov/sites/des/files/Library/Regulations/R.61-69.pdf) for a list of classifications of waterbodies within S.C. If the nearest RWB is unnamed, then search the document for the nearest named RWB. If the nearest, named RWB is not listed, then continue searching the document for the next, named waterbody, proceeding downstream from the site. For example, a site in Anderson County drains to a tributary of Hornbuckle Creek, then to Hornbuckle Creek, then to Middle Branch, and then to Brushy Creek/ Big Brushy Creek. First, search the document for Hornbuckle Creek, then Middle Branch, then Brushy Creek. Because there are 3 listings for Brushy Creek, the next, named waterbody (Saluda River) must be determined. Note that the county for this record for Brushy Creek is listed as Pickens because the headwaters of Brushy Creek are in Pickens County. The classification of the tributary to Hornbuckle Creek is “FW—Freshwaters”. 4. SCCZ Only: Provide the Coastal Receiving Water (CRW) to which the site’s stormwater discharges will drain. This distance is used to determine permitting requirements. Coastal Receiving Water is defined as a receiving water body as defined in the Policies and Procedures of the South Carolina Coastal Zone Management Program, updated July 1995. This includes all regularly tidally influenced salt and fresh water marsh areas, all lakes or ponds which are used primarily for public recreation or a public drinking water supply, and other water bodies within the coastal zone, excluding wetlands, swamps, ditches and stormwater management ponds which are not contiguous via an outfall or similar structure with a tidal water body. 5. Provide the distance, in feet to the CRW. Classification of RWB is not applicable for CRW. B. Waters of the U. S. /State Information (See Section 2.6.2 thru 2.6.6 of the CGP) 1. Complete the “On the Site?” column for items a-d. If yes is selected for that column, then the next 3 columns must be completed. If there are other waters of the U.S./ State (WoS) on the site not listed in items a and b (e.g., stream, river, lake, pond), then list those in item c. Jurisdictional wetlands are under ACOE jurisdiction. 2. Delineation means identification by U.S. Army Corps of Engineers (USACOE) or wetlands consultant. Also, see the checklist for information about delineation requirements. If there are WoS within 100’ of the disturbed area that were not delineated/identified, then explain this in the narrative; this includes WoS that are not on the project site but are within 100’ of the disturbed area. For Direct Critical Area in the SCCZ, delineation means identification by BCM or wetlands consultant. BCM staff may require identification of Direct Critical Area by BCM staff as part of its Coastal Zone Consistency review. 3. Impacts - If construction activities will occur in and/ or will impact WoS, then select yes for “Impacts?” 4. Amount of Impacts - List the amount of impacts to WoS. Provide an additional, separate plan sheet that shows all WoS on the site and the impacted areas. If there are proposed impacts to WoS, please contact USACOE (866-329-8187) and SCDES Water Quality Certification, Standards & Wetlands Programs Section (803-898-4300) to determine additional requirements before submitting this NOI. In the SCCZ , also contact SCDES OCRM Wetlands Section (843-953-0200). Please note that it is the Project Owner/ Operator’s responsibility to ensure that all WoS are shown and identified in the CISWPPP. See Sections 2.6 6. If yes for impacts in B.3 , describe each impact and activity, and list all permits (e.g., U.S. Army Corps of Engineers (USACOE) Nationwide Permit, SCDES General Permit) and certifications that have been applied for or obtained for each impact. Describe the activity(s), whether the impact is permanent or temporary, and any other relevant information. Provide a copy of all permits and certifications for and correspondence with USACOE and SCDES for the impacts. Include all plats referenced in the permits or correspondence. DES 2617 (01/2025) Page 91 of 229 C. S. C. Navigable Waters (SCNW) Information 1. Are SCNW on the site? See https://des.sc.gov/NavigableWaters for the definition of SCNW and other information related to SCNW. Or, contact SCDES Water Quality Certification, Standards & Wetlands Programs Section at (803) 898-4300 for assistance determining the navigability of the waters on your site or with questions related to SCNW. If yes to C.1, list the name of the SCNW. If the SCNW is not named, then provide a description that references the nearest, named waterbody (e.g., tributary to Grove Creek). If no to C.1, do not complete questions C.2 thru C.3 of this section. 2. If yes to C.1 and construction activities proposed by your project will cross over or occur in, under, or thru the SCNW, describe SCNW activities (e.g., road crossing, sub-aqueous utility line, temporary or permanent structures, etc.). This includes temporary and permanent crossings with roads, utility lines, etc. 3. Identify permits providing SCNW Activity(ies) coverages for your site. a. Identify USACOE 404 Permit or 401 Certification issued for the site. Identify permit number(s) or certification(s) and corresponding activities covered under each. b. If applicable, identify the date the SCNW permit was applied for. Identify whether the permit applied for will cover ALL activities listed in C.2 of some activities listed in C.2. List covered activities. c. If a SCNW permit has NOT already been applied for or issued for all of the activities in SCNW for this site, then those activities and conditions can be addressed during the review of the C-SWPPP, and a separate State Navigable Waters permit is not required. Provide an additional plan sheet with plan and profile views (drawn to scale) of SCNW and associated activities; include activities description on the plan sheet. 1. 303(d) Listed Impaired Waterbodies NOTE: The TMDL, 303(d), and Non-Point Source water quality tool is a mapping system showing detailed information on WQMS locations, water quality status, and much more. The tool is available at the following website along with instructions for using the tool: https://des.sc.gov/TMDL. In the SCCZ, list the nearest upstream and downstream SCDES WQMS(s) and corresponding waterbody(ies). Additionally, shellfish stations only monitor for Fecal coliform bacteria. Include both the nearest shellfish monitoring station(s) and full WQMS(s) on the NOI for both upstream and downstream locations when shellfish monitoring stations are present. If a shellfish monitoring site is not present then you only need to list the full WQMS(s). When a shellfish monitoring station is present, everything but Fecal coliform bacteria needs to be assessed at the full WQMS(s). Shellfish monitoring stations begin with numbers and full WQMS(s) begin with letters. a. List the nearest SCDHEC Water Quality Monitoring Station(s) to which the site’s construction stormwater dischar

Text truncated. Open the original for the full document.

Source: Georgetown County website. First collected Oct 17, 2026.