District 1: Clint A. Elliott, Chairman
District 2: Bob Anderson
District 3: Rev. Ernie Cooper
District 4: Ron J. Charlton
District 5: Raymond L. Newton
District 6: Stella Mercado, Vice Chair
District 7: Louis R. Morant
County Administrator
Angela Christian
Clerk to Council
Alma D. Sierra
County Attorney
John D. Watson
August 26, 2025 3:45 PM
GEORGETOWN COUNTY COUNCIL
County Council Chambers
129 Screven Street, Suite 213
Georgetown, SC 29440
Agenda
1. CALL TO ORDER
2. REPORTS / PRESENTATIONS
2a Boards and Commissions Update
2b Solid Waste Management Plan
2c Stormwater Design Manual
2d Road Design Manual
2e Beach Management Plan Update
2f Miscellaneous
3. ADJOURNMENT
[MEET_FOOT]
Page 1 of 229
STATE OF SOUTH CAROLINA )
COUNTY OF GEORGETOWN ) ORDINANCE NO. 25-
AN ORDNANCE TO DISESTABLISH VARIOUS COUNTY COUNCIL-APPOINTED
BOARDS AND COMMISSIONS AND TO ASSIGN FUNCTIONS AND DUTIES TO
COUNTY DEPARTMENTS AND SHERIFF’S OFFICE
WHEREAS, all counties of the State have authority to enact regulations, resolutions, and
ordinances respecting any subject as appears to them necessary and proper for the security,
general welfare, and convenience of the county, or for preserving health, peace, order, and good
government in the county; and,
WHEREAS, the County is authorized to establish and disestablish such boards and
commissions in the county as may be necessary and proper to provide services of local concern
for public purposes, to prescribe the functions thereof and to regulate, modify, merge, or abolish
the same; and
WHEREAS, the powers of a county must be liberally construed in favor of the county
and the specific mention of particular powers may not be construed as limiting in any manner the
general powers of counties; and
WHEREAS, the County is authorized, pursuant to Sec 2-85(b), Disestablishment, of
Ordnance 2008-25 to disestablish, not in conflict with federal or state laws, any county council-
appointed board or commission and assign its functions and duties directly under the governing
authority and administration of the Georgetown County Council; and,
WHEREAS, Georgetown County Council after due deliberation and consideration has
determined it is in the best interest of the people of Georgetown County and the efficient and
good operation of government of Georgetown County to disestablish several boards and
commissions.
NOW, THEREFORE, BE IT ORDAINED AND DECREED by the Georgetown County
Council, the governing body of Georgetown County, that:
Pursuant to Ordnance 2008-25, Sec 2-85(b), Disestablishment, the following Boards and
Commission are hereby dissolved and disestablished, effective December 31, 2025:
• Airport Commission
• Fire District 1 Board
• Historical Commission
• Midway Fire Rescue Board
• Parks & Recreation Commission
• Sheriff’s Advisory Board
Page 2 of 229
The functions of the respective Boards and Commissions shall be performed by the
Departments which the Board or Commission served, and shall be under the supervision of the
respective Department Directors, who are hereby authorized to carry out such functions, subject
to and answerable to the County Council, or County Administrator, as may be directed.
As regards the Sheriff Advisory Board, the Sheriff, being an elected official established
under the laws of the State of South Carolina and a separate and distinct Office from the County,
shall delegate, direct and provide oversight for the functions previously served by the Sheriff
Advisory Board as the Sheriff may deem proper and necessary, in his discretion.
DONE IN REGULAR MEETING THIS ____ DAY OF SEPTEMBER, 2025.
_______________________________(Seal)
Clint Elliott, Chairman
Georgetown County Council
ATTEST:
_____________________________ (Seal)
Theresa E. Floyd, Clerk to Council
This Ordinance, No. 25-_________, has been reviewed by me and is hereby approved as to form
and legality.
______________________________ (Seal)
John D. Watson III
Georgetown County Attorney
First Reading:
Second Reading:
Third Reading:
Page 3 of 229
Executive Summary
Georgetown County Solid Waste Management Plan (SWMP) – Revised 2025
Georgetown County has updated its Solid Waste Management Plan (SWMP) to align with
current local conditions, state regulations, and long-term goals for sustainable solid waste
management. This revision ensures consistency with South Carolina's Solid Waste Policy and
Management Act of 1991 and supports the County’s continued commitment to responsible
environmental stewardship.
Key Updates and Highlights:
Population and Waste Projections:
As of 2025, Georgetown County's population is projected at 65,731, with an anticipated
modest growth rate of approximately 1.9% annually. Despite only moderate population
growth, waste generation has increased by more than 3% per year over the past decade—
highlighting the need for effective solid waste planning and infrastructure.
Recycling and Diversion Progress:
In FY2024, the County achieved a 40% recycling rate for municipal solid waste (MSW),
surpassing the state target of 35%. However, per capita MSW generation remains at 5.55
lbs/day, above the statewide goal of 3.25 lbs/day. Continued public education and
infrastructure upgrades will be crucial to achieving state targets.
Landfill Capacity and Expansion:
Georgetown County relies on a Class Three Landfill for disposal of MSW, C&D waste,
and sludge. As of June 2024, approximately 2.8 million cubic yards of permitted landfill
capacity have been used and approximately 9.5 million cubic yards of permitted capacity
remain. The permitted Class Three Landfill is expected to provide disposal capacity
through 2080.
Facility and Program Improvements:
The County is pursuing EPA SWIFR grant funding to modernize its outdated Material
Page 4 of 229
Recovery Facility (MRF), originally constructed in 1994. An industrial shredder purchase
is also under consideration to improve airspace conservation and enhance recycling of
bulky items like mattresses and tires.
Financial Planning and Oversight:
While the County does not yet have a 20-year capital plan for solid waste infrastructure,
it continues to annually approve a budget supported by landfill fees, household service
fees, and property taxes. FY2023 cost per capita was $9.45 for collection, $66.50 for
disposal, and $29.42 for recycling.
Public Education and Outreach:
The County is revitalizing its public education programs to encourage waste reduction
and recycling. Efforts include landfill tours, school presentations, social media
engagement, and collaboration with organizations such as Keep Georgetown Beautiful.
Goals, Strategies, and Barriers:
The SWMP outlines strategies to meet state-mandated waste reduction and recycling
targets, including infrastructure investment, expanded services, and intergovernmental
coordination. Key challenges include limited funding, market volatility for recyclables,
and rising disposal rates.
Conclusion:
The 2025 revision of the SWMP reflects Georgetown County’s proactive approach to long-term
solid waste management. The plan emphasizes enhanced recycling, landfill capacity planning,
infrastructure modernization, and public engagement to meet future needs. Continued evaluation
and adaptation will be necessary to ensure alignment with evolving state requirements and
environmental goals.
Page 5 of 229
Page 6 of 229
STORMWATER DESIGN MANUAL
FOR
GEORGETOWN COUNTY, SC
July 2025
Page 7 of 229
Table of Contents
SECTION 1 GENERAL ........................................................................................................................................... 2
1.2 Introduction ........................................................................................................................................ 2
1.3 Purpose ............................................................................................................................................... 2
1.4 Applicability ........................................................................................................................................ 3
1.4.1 Redevelopment .................................................................................................................................. 4
1.5 Authority ............................................................................................................................................. 5
1.6 Updates ............................................................................................................................................... 6
1.7 Disclaimer ........................................................................................................................................... 6
SECTION 2 STORMWATER PERMITTING PROCEDURES ...................................................................................... 7
2.1 SCDES-OCRM Permit Requirements ................................................................................................... 7
2.2 Responsibility of the Applicant ........................................................................................................... 7
2.3 Categories of Operators ..................................................................................................................... 8
2.4 Application for Permit and C-SWPPP Review ..................................................................................... 8
2.4.1 Waivers ............................................................................................................................................. 10
2.5 C-SWPPP Approval ............................................................................................................................ 11
2.6 Start of Construction ........................................................................................................................ 12
2.7 SWPPP Availability (OS-SWPPP) ....................................................................................................... 12
2.7.1 Modifications .................................................................................................................................... 13
2.8 End of Construction .......................................................................................................................... 15
SECTION 3 C-SWPPP Contents ......................................................................................................................... 17
3.1 C-SWPPP Contents ............................................................................................................................ 17
3.2 C-SWPPP Specific Requirements ...................................................................................................... 22
3.2.1 Jurisdictional Waters and Critical Areas ........................................................................................... 23
3.2.2 Discharge to a TMDL Watershed or Impaired Waters ..................................................................... 23
3.2.3 Sediment and Erosion Control .......................................................................................................... 24
3.2.4 Special Protection Areas ................................................................................................................... 24
SECTION 4 DESIGN STANDARDS ....................................................................................................................... 26
4.1 Stormwater Management General Standards ................................................................................. 26
4.2 Stormwater Management Design Requirements ............................................................................. 26
4.2.1 General Requirements ...................................................................................................................... 28
4.2.2 Hydrologic/Hydraulic Design Requirements .................................................................................... 29
Page 8 of 229
4.3 Stormwater BMP Design Requirements ........................................................................................... 32
4.3.1 Detention / Retention Design Requirements ................................................................................... 32
4.3.2 Underground Detention Devices ...................................................................................................... 33
4.3.3 Infiltration BMP Requirements and Soil Testing .............................................................................. 34
4.3.4 Underground Exfiltration BMPs Requirements and Soil Testing ...................................................... 36
4.3.5 BMP Maintenance Plan .................................................................................................................... 38
4.4 Water Quality Requirements ............................................................................................................ 39
4.5 Downstream Analysis ....................................................................................................................... 39
4.6 Sediment and Erosion Control Requirements .................................................................................. 40
4.7 Vector Control .................................................................................................................................. 42
4.8 Easements......................................................................................................................................... 43
SECTION 5 STORM SEWER COLLECTION SYSTEM ............................................................................................. 45
5.1 General Design Criteria ..................................................................................................................... 45
5.2 Gutters .............................................................................................................................................. 45
5.3 Inlets ................................................................................................................................................. 45
5.4 Conveyance System .......................................................................................................................... 46
5.4.1 Stormwater Pipes ............................................................................................................................. 46
5.4.2 Open Channels .................................................................................................................................. 50
5.4.3 Outlet Protection .............................................................................................................................. 50
5.5 Culverts And Bridges ......................................................................................................................... 51
SECTION 6 INSPECTIONS ................................................................................................................................... 53
6.1 Permittee/Owner Construction Inspections .................................................................................... 53
6.2 Construction Maintenance ............................................................................................................... 55
6.3 County Inspection ............................................................................................................................. 56
SECTION 7 PERMANENT BMP MAINTENANCE ................................................................................................. 57
7.1 County Permanent Structure Maintenance Inspections .................................................................. 57
7.2 Owner Maintenance Inspections ..................................................................................................... 58
Page 9 of 229
APPENDICES
APPENDIX A
Georgetown County Stormwater Submittal Checklist
APPENDIX B
Georgetown County Fee Schedule
APPENDIX C
Georgetown County Close-Out Application Form
APPENDIX D
As-Built Certification Form
APPENDIX E
Georgetown County As-Built Survey Requirements
APPENDIX F
SCDES Notice of Intent (NOI)
APPENDIX G
Georgetown County Land Disturbance Application
APPENDIX H
Georgetown County BMP Maintenance Agreement
Page 10 of 229
ACRONYMS AND ABBREVIATIONS
ASTM – American Society for Testing and Materials
BCM – Bureau of Coastal Management (formerly OCRM)
BMP – Best Management Practice
CEPSCI – Certified Erosion Prevention and Sediment Control Inspector
CGP – Construction General Permit
C-SWPPP – Comprehensive Stormwater Pollution Prevention Plan
CZC – Coastal Zone Consistency
EPA – Environmental Protection Agency
EPSC – Erosion Prevention and Sediment Control
HSG – Hydrologic Soil Group
LCP – Larger Common Plan
LID – Low Impact Development
MTD – Manufactured Treatment Device
NOI – Notice of Intent
NOT – Notice of Termination
NPDES – National Pollutant Discharge Elimination System
NRCS – Natural Resources Conservation Service
OCRM – Ocean and Coastal Resource Management
OS-SWPPP – On-site Stormwater Pollution Prevention Plan
PAM – Polyacrylamide
SCDES – South Carolina Department of Environmental Services
SCS – Soil Conservation Service
SHWT – Seasonally High Water Table
SMS4 – Small Municipal Separate Storm Sewer System
TMDL – Total Maximum Daily Load
USACOE – United States Army Corps of Engineers
USGS – United States Geological Survey
WLA – Waste Load Allocation
Page 11 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 2 of 58
SECTION 1 GENERAL
1.1 Introduction
Georgetown County (County) is an important coastal area that offers a wide range of employment
opportunities, business and professional services, as well as historical, cultural, and recreational
attractions. Georgetown County residents desire to maintain the character of their communities and
sustain and improve the excellent quality of life that the area provides. Equally important to the
residents of Georgetown County is the protection of the environment and the preservation of the
unique aquatic ecosystem that help make Georgetown County a cherished coastal community.
The Georgetown County Stormwater Design Manual ( Manual) defines minimum standards,
requirements, and procedures for the design, permitting, construction, and maintenance of stormwater
drainage systems within the jurisdiction of the County. As an integral part of the County’s stormwater
program, this Manual applies to land disturbing activities by providing erosion prevention, sediment
control, flood control, water quality improvement, and critical area protection.
This Manual presents minimum stormwater standards that apply to physic al development and land
disturbance within the C ounty. However, the minimum standards will not apply for all situations.
Compliance with these standards does not relieve the applicant of the responsibility to use sound
professional judgment or compliance w ith other local, state , or federal requirements. The County
intends for these standards to assist, but not substitute for, competent work by qualified design
professionals.
1.2 Purpose
The County understands the importance of protecting the lands and waters from the effects of
stormwater runoff. The Georgetown County Stormwater Management Program Ordinance
(Ordinance) was enacted by the County to protect lands and waters from the effects of excessive soil
erosion and sedimentation ; to prevent siltation of rivers, streams and lakes ; to prevent clogging of
drainage channels; to prevent excessive flood damage; to prevent adverse impacts to the property of
adjacent landowners ; and to reduce pollutants in stormwater runoff from new development and
redevelopment.
The Georgetown County Stormwater Management Program (Program) operates to meet current and
anticipated needs of the County . The Department of Public Services , through the Stormwater
Management Program, administers stormwater services for the protection of public and private
properties, rivers, estuaries, and other water bodies from the potential damage resulting from
uncontrolled stormwater releases and non -point source pollution. The purposes of the Program and
this Manual are as follows:
1. Protect human life and health.
2. Improve the quality of stormwater runoff discharge to surface waters and groundwater.
3. Minimize upstream and downstream private and public property damage resulting from erosion,
sedimentation, and flooding.
Page 12 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 3 of 58
4. Prevent new development and redevel opment from creating a demand for public investment in
flood control and water quality improvements works.
5. Provide an effective stormwater management system that will not result in excessive public or
private monies being used for maintenance and replacement of existing portions of the stormwater
system.
6. Facilitate the design of drainage systems that are consistent with good engineering practice and
design and in accordance with the County’s overall planning efforts and stormwater management
planning.
7. Provide a mechanism that allows development with minimum adverse effects to the natural
environment.
8. Encourage preservation of the natural drainage systems in an aesthetically pleasing condition to
the maximum extent practicable.
9. Ensure County compliance with all applicable federal and state regulations.
1.3 Applicability
The standards in this Manual apply to new development and redevelopment projects within
Georgetown County . New development and redevelopment projects require a comprehensive
stormwater pollution prevention plan (C-SWPPP) for submittal by the applicant and approval by the
County to obtain a Land Disturbance Permit (permit) . For the purposes of this Manual, a C -SWPPP
represents the collection of documents required by the County to apply for a Land Disturbance Permit,
as is detailed in Section 3. The County has the responsibility for review of:
1. All projects that result in land disturbance of equal to or greater than one (1) acre.
2. All projects that result in disturbance of less than one (1) acre of total land area that is part of a
Larger Common Plan (LCP) of development or sale.
3. Any land disturbance greater than one-half (1/2) acre and within one-half (1/2) mile of a coastal
receiving water body (but not for single-family homes which are not part of a subdivision).
Parcels that have been divided and platted with the intent of residential or other development, shall
not be considered to be separate land disturbing activ ities and shall not require individual land
disturbance permits. Instead, the developmen t as a whole shall be considered to be a single land
disturbing activity and shall comply with the requirements in this Manual . Hydrologic parameters
that reflect the built-out development shall be used in all engineering calculations. If individual lots
or sections in a residential subdivision are being developed by different property owners, all land
disturbing activities related to the residential subdivision shall be covered by the approved permit for
the residential subdivision. Individual lot owners or developers must sign the individual Lot Notice
of Intent (SCDES Form 0432) to confirm all activities on that lot will be carried out in accordance
with the approv ed permit for the residential subdivision . Failure to provide this form will result in
individual lot owners being required to develop a C -SWPPP meeting the requirements of the
Ordinance and this Manual for each individual lot.
If new lots are being propo sed for development in an established residential neighborhoo d and the
original approved plans or permits cannot be located that show how runoff from these lots is to be
Page 13 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 4 of 58
managed, the ability of the existing stormwater system to accommodate the increase in runoff from
these areas must be shown, or the runoff must be managed on site. Use of the existing stormwater
system must show that the system would be able to accommodate the increase in runoff associated
with the proposed lots and still meet the requirements of this Manual and the Ordinance.
Subdivisions in which each lot is to have a minimum acreage of 5 acres and which do not need roads
or utilities installed, can apply for a Certificate of Compliance if one of the two conditions listed
below are met:
Each lot within one-half (1/2) mile of a coastal receiving waterbody will disturb no more than
one-half (1/2) acres; or
Each lot more than one -half mile from a coastal receiving waterbody will disturb no more
than one (1) acres.
Lots should also have a 15’ undisturbed or vegetative buffer around the property line except for at the
driveway. A separate Certificate of Compliance should be submitted for each lot. If lots are further
subdivided in a future subdivision plat, a full land disturbance application that meets the requirements
of the Design Manual will be required at that time.
1.3.1 Redevelopment
Redevelopment shall generally include changes or improvements to any property that has previously
been developed which results in the addition or modification to the existing property, irrespective of
the condition of the existing surface upon which the redevelopment is performed. This may include
but is not limited to changing of land characteristics as a result of demolition and reconstruction,
structural additions, paving, and re-grading of the existing property.
Redevelopment projects shall be evaluated for the following:
1. If the project site has an existing stormwater conveyance system that is serviceable and
operational, perform an evaluation of the system in the redeveloped condition to determine if it is
capable of conveying the redevelopment flows in accordance with the Manual for the following:
A. If the existing stormwater conveyance system is capable of handling the redevelopment flows
and meeting the peak discharge requirements in accordance with this Manual , then water
quality treatment is required for only the redeveloped area (any area modified from the
existing condition) as indicated in this Manual. A downstream analysis is also required in
accordance with Section 4.5 of this Manual . If the project connects to a public system, the
downstream analysis must show that the redevelopment project will not have an adverse
impact on the public system capacity.
B. If the existing stormwater conveyance system is not capable of handling the redevelopment
flows in accordance with this Manual , then all standards of the Manual apply for the entire
site. Pre-development conditions shall be evaluated as open space, fair condition for the onsite
soil type(s) for the project site. If the project connects to a public system, a downstream
analysis must show that the redevelopment project will not have an adverse impact on the
public system capacity.
2. If the site intended for redevelopment does not have an existing stormwater conveyance system,
no detention or retention, or no water quality treatment, then perform the following:
Page 14 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 5 of 58
A. If the redevelopment project area is less than fifty ( 50) percent of the existing developed
condition area and includes the addition of impervious area, then all standards of this Manual
apply to the additional impervious area.
B. If the redevelopment project area equals or exceeds fifty (50) percent of the existing developed
condition area, then all standards of th is Manual apply for the entire redevelopment project
area. Pre-development conditions shall be evaluated as open space, fair condition for the
onsite soil type(s) for the project site.
The County shall review all C-SWPPP submittals for general compliance with these specif ic
standards. An acceptance by the County does not relieve the applicant from the responsibility of
ensuring all systems are safe; that calculations, plans, specifications, construction, and record
drawings comply with normal engineering standards; the req uirements of this Manual; and other
applicable local, state, and federal rules and regulations. The functionality and compliance of the site
and its infrastructure is the sole responsibility of the design engineer of record. Where any other law,
ordinance, resolution, rule, or regulation of any kind also encompass the requirements included in
this document, the more restrictive shall govern.
The County Stormwater Manager may require more stringent requirements than would normally be
required under these st andards depending on special protection areas, existing flooding concerns,
and/or environmental constraints. The Stormwater Manager has the option of accepting alternatives
to the plans, specifications , and design details of this Manual if the alternatives proposed meet or
exceed the adopted performance standards.
1.4 Authority
The Clean Water Act of 1972 (CWA), as amended in 1987, prohibits the discharge of pollutants into
waters of the United States unless the discharge complies with a National Pollutant Dis charge
Elimination System (NPDES) permit. The County is subject to the Phase II Stormwater NPDES
permitting requirements and was issued a NPDES General Permit for Storm Water Discharges from
Regulated Small Municipal Separate Storm Sewer System (SMS4) coverage by the South Carolina
Department of Health and Environmental Control (SC DES). The Federal and state NPDES permit
program requires the County “develop, implement, and enforce a program to address stormwater
runoff from new development and redevelop ment projects that discharge into the regulated SMS4.”
Within this regulatory context, the County implements development requirements that reduce water
pollution carried in stormwater runoff.
Laws that provide the County with the authority to regulate stormwater drainage within the County’s
jurisdiction include, but are not limited to the following:
1. Constitutional authority as a municipal corporation to promulgate regulations governing the
discharge of stormwater.
2. Section 48-14-10 et seq. of the Code of Laws of South Carolina, 1976, amended.
3. The Stormwater Management Program Ordinance; Ordinance 2014-44.
Page 15 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 6 of 58
1.5 Updates
This Manual is intended to be a dynamic document. As design technology an d criteria evolve, the
Manual may and/or will require update s, modifications, and improvements. As updates are made,
they will be available for download from the County’s website. It will be each user’s responsibility
to maintain a current edition of the Stormwater Design Manual. The website format will allow the
user to easily obtain or update new Manual information.
1.6 Disclaimer
This Manual is established to provide Georgetown County Department of Public Services Director;
County Stormwater Manager, or their duly appointed representative; property owners; develop ers;
engineers; surveyors; and builders a better understanding of acceptable engineering methods to meet
the intent of the County’s Stormwater Management Program Ordinance . Design of stormwater
management for development and redevelopment requires the experienced judgment of the designer.
The County accepts no responsibility for any loss, damage, or injury as a result of the use of this
Manual.
The application of this Manual, the Stormwater Management Program Ordinance, and the provisions
expressed herein are the minimum stormwater management requirements and shall not be deemed a
limitation or repeal of any other powers granted by statute. In addition, if site characteristics indicate
that complying with the County’s minimum stormwater management requireme nts will not provide
adequate design or protection for local property or residents, the County, as part of the review process,
will require the Permittee to exceed the minimum stormwater management practices, control
techniques, design and engineering methods, and such other programs and controls as are required to
comply with the County’s NPDES permit.
Page 16 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 7 of 58
SECTION 2 STORMWATER PERMITTING PROCEDURES
This section provides developers, owners, engineers, contractors, and others with the information
needed to ob tain a Georgetown County Land Disturbance Permit as required in accordance with
Section 1.3 of this Manual. This section includes the process to receive a permit, comply with that
permit during construction, and close -out procedures. Detailed information a bout the required C -
SWPPP components and the design requirements are included in Sections 3 and 4 of this Manual.
2.1 SCDES-BCM Permit Requirements
Unless otherwise exempt, all land disturbing activities disturbing one (1) or more acres of land,
including sites smaller than one (1) acre that are part of a LCP of development ultimately disturbing
one (1) or more acres, are required to o btain permit coverage for their stormwater discharges by
submitting an approvable C-SWPPP to the County.
A LCP is broadly defined by SCDES as any announcement or piece of documentation (including a
sign, public notice or hearing, sales pitch, advertisement, drawing, permit application, zoning
requires, computer design, etc.) or physical demarcation (including boundary signs, lot stakes, survey
markings, etc.) indicating construction activities may occur on a specific plot . A common plan for
development or sale identifies a site where multiple separate and distinct construction activities (areas
of disturbance) are occ urring on contiguous areas. Such sites may have one operator or owner or
several operators and owners. Construction activities may take place at different times on different
schedules, in separate stages, in separate phases, in combination with other const ruction activities.
Each Developer, Operator, or Owner for each site or project determined to be a part of a LCP is
subject to permitting requirements of this Manual.
Land disturbances less than one (1) acre, but greater than one-half (1/2) acre, which are located within
one-half (1/2) mile of a coastal receiving water (Coastal Zone) are also required to obtain permit
coverage for their stormwater discharges. Coastal receiving waters are defined in the Policies and
Procedures of the South Carolina Coastal Zone Management Program as updated.
Projects or developments located in the Coastal Zone that are not part of a LCP of development or
sale, that disturb one -half (1/2) acre or less , and are located within one -half (1/2) mile of a coastal
receiving water are automatically granted coverage under th e Construction General Permit
SCR100000 provided the appropriate notifications are submitted and Best Management Practices are
being used during construction activities. These construction activities require a Coastal Zone
Consistency (CZC) determination, which is issued by SCDES’s Bureau of Coastal Management and
must be submitted to the County.
2.2 Responsibility of the Applicant
The applicant shall prepare a Comprehensive Stormwater Pollution Prevention Plan (C -SWPPP) in
accordance with the requirements of this Manual herein and shall submit the plan to the County for
review and approval. The applicant is responsible for providing sufficient infor mation to determine
compliance with this Manual, the Ordinance, and SC DES Stormwater Regulations. The applicant is
responsible for ensuring that the information presented is a true and factual representation of the
existing conditions and proposed conditions after development. The applicant is also responsible for
Page 17 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 8 of 58
ensuring that the activities and control measures specified in the C -SWPPP shall be constructed
according to the approved plan.
2.3 Categories of Operators
Each category of operator is specified by the operator ’s ownership, responsibilities and/or
development of a construction site. These categories include Primary Permittees, Secondary
Permittees and Contractors.
Primary Permittees may include, but are not limited to a developer, landowner, real tor, builder,
utility provider, public or private entity, etc. This person has the option of employing contractors to
conduct land-disturbing activities under their general permit coverage. Primary Permittees may rely
on, or require, Secondary Permittees a nd/or Contractors to assist with project activities necessary to
ensure compliance with the Construction General Permit ( CGP) and implementation of the On-Site
Stormwater Pollution Prevention Plan). The primary permittee is ultimately responsible for the site’s
compliance with the approved C-SWPPP.
Secondary Permittees are owners/builders seeking individual control of a portion or portions of a
construction site, independent of the Primary Permittee, but still using the same C-SWPPP approved
when initial coverage was granted. These Permittees are required to submit an Individual Lot Notice
of Intent (SCDES Form 0432) to obtain their permit coverage before conducting any land-disturbing
activities. Examples of Secondary Permittees are individual lot(s) owners within a residential
subdivision.
Contractors are operators that are employed by either the Primary or Secondary Permittee and have
confirmed their understanding and promise to maintain compliance with the approved SWPPP by
completing a Contractor Certification Form (SCDES Form 0437).
2.4 Application for Permit and C-SWPPP Review
A pre-submittal meeting is required for every land disturbance activity within the County that requires
a Land Disturbance Permit from the County Stormwater Department . The site owner and/or the
person who will be responsible for the land disturbance should contact the Stormwater Manager via
email at stormwater@gtcounty.org to request a pre-submittal meeting, and shall include the location
of the site and the intended land disturbing activity in the email . The meeting will be at a time
agreeable to all parties, and in most situations this meeting can be a virtual meeting. For larger areas
of land disturbance, larger common plan s, sites with existing flooding concerns, or other sites with
potentially complex submittals, a meeting on site may be requested . This meeting is intended to
briefly review the submittal requirements, identify any known issues or problem areas near or
downstream from the site, and discuss potential challenges at the identified site. The County will not
provide any approvals during this meeting but can discuss the concept design and provide feedback.
The person responsible for the land disturbing activity shall apply in writing to the County for a Land
Disturbance Permit for such activity by submitting a C-SWPPP for review. The complete submittal
package shall be sent in an email to stormwater@gtcounty.org. Each item shall be properly labeled
and included as a separate attachment and identified it in the body of the email. As an option, large
files can be submitted through a cloud based storage service such as Dropbox. This C-SWPPP shall
Page 18 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 9 of 58
be complete as described in Section 3 and prepared in accordance with the provisions of this Manual
and the Ordinance. For those proposed activities outside of the MS4 area, the applicant can submit
the permit application for NPDES coverage to SC DES concurrently (contact SCDES for additional
information on SCDES requirements for submission). Proposed activities inside the MS4 area will
be discussed in more detail in Section 2.5.
Specific requirements of the permit application and approval process are based upon the extent of the
land disturbing activity , as discus sed in Section 1.3 . The person responsible for land disturbing
activity shall also be required to obtain building permits and/or land disturbance permits prior to
beginning construction. The permit application and approval procedures are as follows:
1. Upon receipt of a complete C-SWPPP per the requirements in this Manual , the C ounty shall
conduct an initial review. ALL items from the Georgetown County Stormwater Submittal
Checklist (Appendix A) are required or applicant shall provide an applicable explanation. Missing
items on subsequent reviews may be allowed if the applicant provides confirmation that the item
had been previously reviewed and approved by Stormwater Division Staff. Incomplete submittals
shall not be reviewed . If an incomplete submittal is re ceived, the applicant will be notified and
the items will be held for a period of 48 hours . Afterward, the items will be discarded, and the
review fee returned.
2. When the land disturbing activity consists of the construction of a pond, lake or reservoir which
is individually built and not part of a permitted land disturbing activity, a C-SWPPP will not be
required if the pond, lake or reservoir is permitted under the state Dams and Reservoirs Safety
Act (Regulation 72 -1 through 72-9) or has received a cer tificate of exemption under the state
Dams and Reservoirs Safety Act. Best management practices shall be used to minimize the impact
of erosion and sediment.
3. If, after review, the application for a land disturbance permit is denied, written notification
indicating the reason or reasons for denial shall be forwarded to the applicant. The applicant may
correct the deficiencies in conformance with this Manual and t he Ordinance and re -submit the
application one additional time with no additional fee.
4. All re-submittals following the second re-submittal shall be subject to a re-review fee equal to the
original fee for each re-submittal. This re-review fee shall only apply to those re -submittals that
require changes to the design of the site; minor comments (i.e. u pdating a table for consistency,
adding a detail to the plan set, etc) will not require a re -review fee. See Appendix B for more
details.
5. If the revised a pplication is approved, the County shall issue the C -SWPPP approval (Section
2.5).
6. These requirements may be modified by the County on a case -by-case basis to address specific
stormwater quantity or quality problems or to meet other regulatory requirements which are more
stringent than the requirements of this Manual.
7. Any C-SWPPP approval shall be suspended, revoked, or modified by the County upon finding
that the holder is not in compliance with this Manual, the Ordinance, or the approved C-SWPPP.
Page 19 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 10 of 58
The C -SWPPP contains supporting calculations, reports, drawings, and sufficient information
describing the manner, location, and type of measures in which stormwater runoff will be managed
from the entire lan d disturbing activity . The County shall review the C -SWPPP to determine
compliance with the requirements of th is Manual prior to approval . The approved C -SWPPP shall
serve as the basis for water quantity and water quality control on all subsequent construction activities
specific to the site.
All C-SWPPPs submitted for approval shall contain a certification by the person responsible for the
land disturbing activity (owner, developer, etc.) that the land disturbing activity shall be accomplished
pursuant to the approved C -SWPPP and that responsible personnel will be assigned to the project.
This certification is included in Section 1.6 of the SCDES SWPPP Template.
All C-SWPPPs shall contain a certification by the person responsible for the land disturbing activity
acknowledging the right of the County to conduct on-site inspections.
All C-SWPPPs submitted to the County for approval shall be prepared, amended when necessary,
certified, and stamped by a qualified designer. The following disciplines may certify and stamp/seal
plans as allowed by their respective licensing act and regulations:
1. Registered professional engineers as described in S.C. Code 1976, § 40-22-10 et seq.
2. Registered landscape architects as described in S.C. Code 1976, § 40-28-10(a).
3. Tier B land surveyor as described in S.C. Code 1976, § 40-22-10 et seq.
Pursuant to S.C. Code 1976, § 40 -22-280, C-SWPPPs may also be prepared by employees of the
federal government and submitted by the person responsible for the land disturbing activity to the
County for approval.
The Ordinance does not prohibit other disciplines or certified professionals, including, but not limited
to, certified professional erosion and sediment control specialists, which have appropriate background
and experience from taking active roles in the preparation of the C -SWPPP and design process. All
stormwater plans and specifications submitted to the County for approval shall be stamped/sealed by
one of the qualified disciplines listed above.
2.4.1 Waivers
The County may grant waivers from the requirements of this Manual for individual construction
activities if there are exceptional circumstances applicable to the site such that stri ct adherence to
these provisions shall not meet the intended purpose of the County’s Ordinance and this Manual. A
standalone written request from the applicant shall contain descriptions, drawings, and any other
information that is necessary to evaluate the proposed waiver. A separate written waiver request shall
be required if there are subsequent additions, extensions, or modifications which would alter a
previously approved waiver. Waivers are not available for water quality controls. A project may be
eligible for a waiver of stormwater management for water quantity if the applicant can demonstrate
that:
1. The proposed project shall have no significant adverse impact on the receiving natural
Page 20 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 11 of 58
waterway or downstream properties; or
2. Attenuation of the runoff wi thin the subject basin shall alter the release rate such that
downstream systems shall be adversely impacted by storing the regulated storm event (i.e. it
can be shown that the time of concentration of the basins will coincide, leading to an increase
of the peak at an already vulnerable point downstream).
3. The imposition of peak or volume control requirements of stormwater runoff would aggravate
downstream flooding. An example of this situation would be when an overall watershed
analysis has indicated that i mposing restrictions in the upstream watershed of the proposed
project would cause the timing of the peak of the routed hydrograph to coincide with the peak
flow from another contributing watershed at a certain point downstream.
2.5 C-SWPPP Approval
Upon County approval of the permit application in areas within the MS4 area, the County will issue
a Conditional Letter of Approval (CLA) to the applicant. The applicant shall send a copy of the
County’s CLA, the County approved Notice of Intent (NOI), and the NPDES review fee to SCDES
for NPDES CGP permit coverage. For those areas outside of the MS4 area, the applicant is
encouraged to submit for SC DES approval concurrently with submission to the County. The land
disturbing activity shall not begin until the applicant submits the SCDES issued NPDES permit to the
County and the County delivers official approval and official stamped plans to the applicant. The
County cannot approve C -SWPPPs and issue a Land Disturbance Permit until NPDES permit
coverage i s received from SC DES. The C -SWPPP shall not be considered approved without an
approval stamp signed and dated by an authorized person with the County . The County stamp of
approval on the plans is solely an acknowledgement of satisfactory compliance with the requirements
of this Manual and the Georgetown County Stormwater Management Ordinance. The approval stamp
does not constitute a representation or warranty to the applicant or any other person concerning the
safety, appropriateness, or effectiveness of any provision of or omission from the stormwater and
sediment control plan.
Upon approval of the submitted C-SWPPP and submission of SCDES approval where necessary, the
County will issue a Letter of Approval , via e-mail, to the applicant and site ow ner, as listed on the
County Land Disturbance Permit . The email will include information regarding next steps, which
includes providing the County with three (3) hard copy sets of construction plans to be stamped by
the County and directions to schedule a pre-construction meeting for the project. Approval by the
County does not relieve applicants from responsibility for ensuring system performance, safety , and
compliance with other local, state and federal regulations . Applicants must ensure that calculati ons,
designs, specifications, construction, and record drawings comply with acceptable eng ineering
standards and this Manual. County approval does not constitute a guarantee of system performance
nor does it relieve the applicant of liability for the sufficiency, suitability, or performance of facilities.
For projects regulated by other jurisdictions, applicants must comply with any additional or varying
requirements and receive approval from those entities. Applicants are to provide proof of approval
to the County as deemed necessary.
Approved C-SWPPPs remain valid for five years from the date of approval . Extensions or renewals
of C-SWPPP approvals may be granted by the County upon approval of an updated application by
Page 21 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 12 of 58
the person responsible for the land disturbing activity. If changes to the original C -SWPPP are not
required, only a completed NOI and the appropriate application fee are required.
2.6 Start of Construction
The County requires that a pre-construction conference be performed on-site for all projects prior to
the beginning of land disturbing activities to ensure all permittees and contractors performing the
work know their responsibilities under the approved C-SWPPP. The applicant shall request an on-
site pre-construction meeting on a date that is agreeable to County staff and all parties. The SWPPP
Preparer will conduct the meeting with input from County Staff. The County will provide the
applicant with the Land Disturbance Permit and Placard as well as the stamped set of approved plans
at this meeting. At its discretion, the County may make inspector and site manager attendance at the
pre-construction conference a requirement to receive the permit.
The applicant shall notify the County at least three (3) business days prior to commencement of any
land disturbing activity or construction under an approved C -SWPPP. All required building permits
must be obtained. Notification shall be e-mailed to Stormwater@gtcounty.org.
2.7 SWPPP Availability (OS-SWPPP)
The person(s) responsible for day-to-day operational control over implementation, shall have a copy
of the On-site Stormwater Pollution Prevention Plan (OS-SWPPP) available at a central location on-
site for the use of all those identified as having responsibilities under the OS-SWPPP whenever they
are on the construction site. The OS-SWPPP shall be retained at the construction site from the date
of commencement of construction activities to the date of final stabilization . If an on-site location is
unavailable to store the OS -SWPPP, notice of the OS -SWPPPs location along with any updated
contact information shall be posted at the construction site. OS -SWPPP locations shall be easily
accessible (not more than a 15-minute drive away from the project site) and shall be accessible during
normal business hou rs to SC DES, Environmental Protection Agency (EPA), local government
officials, and the County for review.
For linear construction of roads or utilities (such as utility construction including electrical power
lines, gas lines, main sewer trunk line s, and water distribution lines) that are not part of a LCP of
development, where it is not practical to have the OS -SWPPP on location, the Permittee and/or
Operator shall, upon request, make the OS-SWPPP available by the end of normal business hours, or
by the following business day under extenuating circumstances.
OS-SWPPPs shall be made available upon request and at the time of a construction site inspection by
the County. Updated copies of the approved OS -SWPPP shall be sent to the appropriate SC DES
Environmental Quality Control (EQC) Regional Office in situations where it is not practical to have
the approved OS-SWPPP on location. Electronic copies of third-party inspections shall be submitted
to the County via e -mail to Stormwater@gtcounty.org on a weekly basis throughout the project .
Failure to submit these inspections may result in a notice of violation or penalty.
The OS-SWPPP includes:
Page 22 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 13 of 58
1. All items required for the C -SWPPP except for the engineering calculations and engineering
reports;
2. NOI (stamped and approved copy), copy of the CGP coverage letter from SC DES; this includes
any individual lot NOIs (SCDES Form 0432) as required by Secondary Permittees;
3. Copy of local approvals (additional letters, approvals, or certifications necessary to implement the
OS-SWPPP, when necessary);
4. Copy of United States Army Corps of Engineers ( USACOE) approvals (certifications to allow
impacts to Waters of the State or Jurisdictional wetlands) when necessary;
5. Contractor certifications, (certifications necessary to allow contractors to conduct construction
activities within the construction site);
6. Any logs necessary to track the progress, compliance, modifications and those associated with the
construction site. These logs may include, but are not limite d to, a pre -construction conference
log, an inspection log, a stabilization log, a rain log, a contractor log and/or any additional record
keeping as deemed necessary by the County, Contractor, SCDES, SMS4 or an entity delegated
under Regulation 72-300;
7. SCDES Construction General Permit SCR100000 (One copy, excluding the appendices.
Provisions may be made for the copy of the general permit to be accessed electronically as long
as a hard copy can be made available by the end of the working day when required); and
8. CZC Certification.
2.8 Modifications
Each OS-SWPPP shall be modified if it is determined during inspections or investigations by the
County, state, tribal or federal officials that the OS-SWPPP is ineffective in minimizing pollutants in
stormwater discharges or controlling peak runoff rates from the construction site.
Each OS-SWPPP shall be modified as necessary to include additional or modified BMPs, which are
designed to correct problems identified during the construction site inspection by any qualified
inspector, or by local, state, tribal or federal officials. Revisions to each OS-SWPPP shall be
completed within seven (7) calendar days following the inspection.
1. Major Modifications - The C-SWPPP shall be modified and submitted for rev iew and receive
approval by the County prior to implementation if any of the following conditions are met:
A. Whenever there is a significant change in design, construction, operation, or maintenance at
the construction site resulting in discharges that will cause, have the reasonable potential to
cause, or contribute to violations to water quality standards.
B. Whenever a change in the design, construction, operation, or maintenance calls for a revision
of any approved C-SWPPP based on the following list of major modifications:
i. Modifications that will affect the hydrology or trapping efficiency calculations including
the following:
Page 23 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 14 of 58
a. Resizing Sediment or Detention Basins that either reduces the stormwater volume
capacity and/or is resized to handle increase/decreas e incoming peak flows or runoff
volumes due to revised site development plans;
b. Deletion of Sediment or Detention Basin or Sediment Trap;
c. Relocation of Sediment or Detention Basins resulting in increases/decreases in
receiving drainage area and/or resulting in a new/relocated basin outlet location, which
is directed towards an outfall that was not approved within the C-SWPPP;
d. Addition/Removal of Sediment or Detention Basin;
e. Modification of Sediment or Detention Basin Outlet Structure;
f. Changes in grading that alter drainage patterns that may result in increased or
decreased flow to a Sediment or Detention Basin; and
g. Amending Construction Sequence in a fashion that the Detention Basin is not installed
before Grubbing Operations begin.
ii. Point Discharge or Outfall location changes.
iii. Any modification to regulated water quality structural control measures.
iv. Adding a new point discharge.
v. Addition of Impervious Area due to revised site development plans.
vi. Addition of Disturbed Area.
vii. Changes to Navigable Water Crossing.
viii. Addition of Sediment Trap(s) when required to obtain 80% Trapping Efficiencies for
disturbed areas not previously permitted or redirected away from an approved water
quality BMP.
ix. Site layout changes that require redesigning the stormwater management system.
x. Any additional modifications as determined by the County.
2. Minor Modifications -The Permittee shall modify the OS -SWPPP and keep a record of each
modification within the OS-SWPPP if any of the following conditions are met:
A. Addition of BMPs - Addition of Silt Fence, Slope Drains, Inlet Protection, Outlet Protection
that does not involve additional wetland impacts, or Check Dams to improve the overall
stormwater management and sediment and erosion control at the construction site.
B. BMP Relocations - Relocation of construction entrance, pond inlet pipes (within a pond), and
any other proposed BMP to improve the overall stormwater management and sediment and
erosion control at the construction site.
C. Removal of Disturbed Areas - As long as the removal of the disturbed area does not also
remove any BMPs required to meet Water Quality or Quantity Standards. Removal of
disturbed area only qualifies for disturbed a rea that was included in the initial coverage
approval and that was never disturbed (i.e., cleared, grubbed or graded).
Page 24 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 15 of 58
D. Modifying Individual Lot Drainage - Unless the changes affect the inflow to a Detention
Structure or Analysis Point, to which the lot drains, that was not previously approved.
2.9 End of Construction
Upon project completion related to t he land disturbing activity, a Georgetown County Stormwater
Project Close Out Package along with the SCDES Notice of Termination (NOT) is sent to the County
Stormwater Division. For submission of a Project Close Out Package, one or more of the following
conditions shall be met prior to issuance of a County Certificate of Occupancy:
1. Final stabilization has been achieved on all portions of the site for which the Permittee is
responsible;
2. Another Operator has assumed control, according to §122.41(l )(3) of SC Regulation 61 -9, over
all areas of the site that have not been finally stabilized;
3. Coverage under another County Land Disturbance Permit and a general NPDES permit has been
obtained;
4. For residential construction only, permanent stabilization has been completed and the residence
has been transferred to the homeowner;
5. Land disturbance activities were never initiated on the construction site and the construction site
remains permanently stabilized.
A full review of the close out package will be conducted. Once the project’s close out package is
approved, a final inspection shall be conducted to review the project site for compliance with the
approved C-SWPPP. The Georgetown County Stormwater Project Close Out Package includes:
1. The Georgetown County Close-Out Application Form (Appendix C)
2. The Georgetown County As-Built Certification Form (Appendix D)
3. Electronic and hard-copy as-builts that comply with the County’s As-Built Survey Requirements
(Appendix E)
The Georgetown County Project Close Out Package and SCDES NOT shall be signed by the Project’s
Design Engineer and Permittee and submitted within thirty (30) days of one of the above conditions
being met. The Georgetown County Project Close Out Package and SCDES NOT is not valid un til
the County concurs an d notifies the Permittee of County acceptance of the Georgetown County
Project Close Out Package and SCDES NOT. Upon County approval, the Permittee shall submit the
NOT to SC DES. If a Georgetown County Project Close Out Pac kage and SC DES NOT has been
submitted and the construction site does not meet the criteria for termination, then the construction
site remains subject to the provisions of the C-SWPPP.
If there are any permanent BMPs on the site, a revised maintenance agreement shall be submitted
along with the Georgetown County Project Close Out Package and SC DES NOT, when the
responsible party(ies) or individual(s) accepting ownership or maintenance of permanent stormwater
control devices have changed from what w as originally approved. For infiltration BMPs and/or
underground systems, the manufacturer’s representative or other qualified person must be present on-
Page 25 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 16 of 58
site during installation and provide a letter to certify that the BMP was installed correctly and in
compliance with manufacturer’s recommendations and the construction plans.
For residential subdivisions, Primary Permittees do not need to terminate permit coverage in areas
where Secondary Permittees have received permit coverage to perform work under th e permit.
Primary Permittees can request to terminate coverage when Secondary Permittees are authorized to
conduct construction activities, independent of the Primary Permittee, for the remaining disturbed
areas on the construction site and final stabilization has been achieved on all other ar eas of the
construction site.
Page 26 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 17 of 58
SECTION 3 C-SWPPP Contents
This Section provides detailed information on the documents and information required for submission
for a complete C -SWPPP to obtain a Land Disturbance Permit in accordance with the Manual an d
Ordinance. This is a comprehensive list and omission of any item shall require an explanation within
the submittal. It is encouraged that the application use the SCDES C-SWPPP template as a basis with
the additional documents as Appendices, to be sub mitted as stand -alone documents for review, as
described in Section 2.4.
3.1 C-SWPPP Contents
All C-SWPPPs shall contain the following information as applicable.
1. A fully completed Georgetown County Stormwater Submittal Checklist (Appendix A).
2. A fully completed SCDES Notice of Intent (NOI) form for a permit . SCDES’s NOI is provided
in Appendix F.
3. Georgetown County Land Disturbance Application, signed (Appendix G).
4. C-SWPPP document body in a format in line with the SCDES template, to include;
A. A project narrative that describes the scope of the project, including detailed pre - and post-
development conditions. This project narrative shall include a signed certification by a
registered professional as described in Section 2.3 of this Manual.
B. A description of the Erosion Prevention BMPs, Sediment Control BMPs, and water quality
BMPs, including their use, drainage area, maintenance, and inspections.
C. Description of all post -construction stormwater management measures that will be installed
during the con struction process to address water quality in stormwater discharges after the
construction operations have been completed.
D. Summary tables for the pre and post development peak discharge rates at each point of
analysis for the 2-, 10-, 25-, and 100-year, 24 hour storm events.
E. Summary tables for any ponds or other stormwater detention/retention features, including the
bottom, normal water level ( NWL), if applicable, top of bank, and water surface elevation
(WSE) at the 2-, 10-, 25-, and 100-year, 24-hour storm events.
5. Maps showing the existing project area, including the following:
A. A vicinity map indicating north arrow, scale, property boundary, and other information
necessary to locate the property or tax parcel. The map shall show the proposed site, adjacent
roads, and existing drainage structures including pipes, ditches, streams, lakes, catch basins,
and similar facilities. The map shall be of sufficient scale to determine features of the proposed
site. Any off -site facilities or property located upstream and downstream that might be
impacted by the stormwater runoff from th e project shall be shown on the location sketch .
Multiple maps may be included to convey this information.
B. The location of the land disturbing activity with the property boundary outline d shown on a
United States Geological Survey (USGS) 7.5 minute topographic map or copy, with the route
of stormwater runoff from the site to the nearest waterbody shown.
Page 27 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 18 of 58
C. Federal Emergency Management Agency (FEMA) flood maps and, if available, federal and
state wetland maps. The maps or plat shall show the location of the 100-year flood plain with
known floodways, if applicable.
D. Soils map, including the soil type and associated Hydrologic Soil Group (HSG).
E. Pre- and post- drainage maps both showing stormwater runoff directions and drainage areas,
time of concentration flow paths, outfall locations, points of analysis, and receiving waters.
6. Full-size construction plans at an appropriate scale with the limits of disturbance, north arrow,
scale, datum, and other pertinent information included on all sheets. The plan set, at a minimum,
shall indicate:
A. The existing and proposed topography showing spot elevations with contours not greater than
one (1)-foot intervals, as required by the County. The plat and topographic map shall conform
to provisions of applicable state regulations. Existing contours should extend off -site to the
extent necessary to show how the proposed site is tying into the existing area.
B. Existing site conditions to include, at a minimum, exi sting buildings, structures, drainage
features, stormwater infrastructure, utilities, and waters of the state (including wetlands).
C. Proposed buildings, structures, parking areas, roads, stormwater conveyance system, BMPs,
and other planned features. The propos ed improvements associated with the Stormwater
Management Plan, shown with a scale of no greater than 1 -inch = 50-feet, should include
their proposed elevations, including finished floor elevations.
D. All ponds and basins shall have the stage/storage tables on the Grading and Drainage plan
sheet (or other appropriate sheet). Include the max water surface elevations for each pond for
all storm events (2-, 10-, 25-, and 100-year), the normal water surface, and the top of bank .
Show location and elevation of emergency spillway and outlet control structure. The location,
size, and elevation of any internal or external stormwater management facilities shall be
shown with sufficient details to determine the materials of construction and the manner of
construction.
E. A detailed construction sequence specific to the site, to include removal of sediment from the
stormwater system and sediment basins prior to final site stabilization.
F. The location of any existing or proposed private or public drainage easements shall be shown.
Private easements shall be obtained when stormwater management facilities are located on
property not within the proposed site. Private easements shall be established when the
stormwater system crosses more than one parcel. See Section 4.2.13 for de termination of
easement widths.
G. Limits of grading, including limitations of mass clearing, and the surface area involved.
H. Erosion and Sediment Control plan sheets with required phasing per the CGP.
I. Pipe Profiles showing, at a minimum, pipe size, invert elevations, rim elevations, existing and
proposed ground surface, 25-year HGL, and any utility crossings.
J. Details for each proposed erosion and sediment control measure and stormwater system
component.
Page 28 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 19 of 58
7. A Stormwater Management Report with all stormwater management and stormwater drainage
computations and calculations, including:
A. Pre-development and post -development hydrologic analysis (including the name of the
model/procedure used, i.e. ICPR model) , velocities, peak flow rates of discharge, retention
volumes, and inflow and outflow hydrographs of stormwater runoff at all existing and
proposed points of discharge from the site . If a computer program is used, assure model
schematic showing connectivity and key input and output parameters are provided . If the
standard program inputs and outputs are inadequate, provide annotations and additional
narrative to adequately describe the model.
B. Clearly defined discharge points with tailwater assumptions discussed in the narrative.
C. Average slope and hydraulic flow length for both existing conditions and for the future
developed conditions.
D. The existing land use description, in accordance with land use and soil groups from TR-55
(i.e. Wooded-fair cover).
E. A Curve Number Analysis for existing and proposed conditions. Wet ponds, wetlands, surface
waters, and gravel areas intended for vehicular traffic must be assigned a curve number of 98.
F. The amount of pervious and impervious surfaces for both the existing and developed
conditions.
G. Delineation and tabulation of drainage areas contributing to each inlet, pipe, culvert, ditch, or
swale for both existing and proposed conditions.
H. The delineated drainage basin and sub-basin areas in acres for both the site and any off -site
areas which drain onto or through the site for pre and post development. Include basin areas,
curve numbers, time of concentration paths, soils, discharge points (points of analysis,
boundary points), and model connectivity. Be sure labels are consistent with calculations and
modeling.
I. Analysis and c alculations showing the proposed project does not cause adverse upstream
impacts.
J. Runoff routing calculations for all detention basins showing discharge flow rates, elevations,
and volumes retained or detained during applicable storm events . Calculations for storm
events with more frequent return periods may be required by the County to be performed to
ensure the effectiveness of the system in controlling lesser events.
K. For surface storage facilities, stage storage computation and stage discharge computations for
major outfall structures shall be based upon appropriate hydraulics.
L. For infiltration and subsurface exfiltration systems, the calculations shall be based upon the
testing results obtained from a licensed geotechnical engineer as will be described in Section
4.
M. Site conditions around points of all surface water discharge, including vegetation and method
of flow conveyance from the land disturbing activity.
N. Storm sewer analysis, if applicable.
Page 29 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 20 of 58
O. Water Quality Calculations showing how t he water quality volume was calculated and
supporting calculations for releasing the water quality volume for at least 24 hours, but no
greater than 72 hours. See Section 4.4.
8. Erosion and sediment control provisions for during construction, including:
A. Provisions to minimize soil compaction, preserve topsoil, and limit disturbance.
B. Provisions to control stormwater volume and velocity within the site to minimize soil erosion
during construction activity. For outfalls from drainage areas with ten or more disturbed acres,
a sediment basin or equivalent sediment control BMP is required . Sediment basins shall
include skimmers and baffles.
C. Provisions to control stormwater discharges, including both peak flow rates and total
stormwater volume, to minimize erosion at outlets and to minimize downstream channel and
stream bank erosion during construction activity.
D. Provisions to minimize the amount of soil exposed during construction activity including, but
not limited to, the following:
i. Implement a phased stormwater management plan that limits the amount of exposed soil
during construction by outlining the Limits of Disturbance for each phase and by labeling
areas that are not to be disturbed throughout the course of construction activities or until
a later phase of construction activities;
ii. Outline the Limits of Disturbance on the construction plans and label areas within the
construction site that are not to be disturbed;
iii. Stabilize exposed areas as soon as practical to limit the duration of large areas of exposed
soil; and
iv. Implement temporary seeding/grassing techniques.
E. Provisions to minimize the disturbance of existing steep slopes (i.e., slopes of 30% (~3H:1V)
or greater), unless infeasible.
F. Provisions to minimize sediment discharges from the site during construction activity.
G. Provisions to provide and maintain natural buffers after stormwater runoff is treated by
construction site BMPs, unless infeasible during construction activity . Buffer zone
management requirements listed in Section 3.2.4 of the SCDES CGP and Georgetown County
Zoning Regulations are applicable to all site development projects in Georgetown County.
H. Provisions to provide soil stabilization (temporary and permanent).
I. Provisions to minimize the discharge of pollutants from dewatering trenches and excavations.
Discharges are prohibited unless managed by appropriate BMPs for stormwater and non -
stormwater discharges.
J. Provisions to design, install, implement, and maintain effective pollution prevention measures
to minimize the discharge of pollutants during construction activity . At a minimum, such
measures shall be designed, installed, implemented and maintained to:
Page 30 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 21 of 58
i. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash
water, and other wash waters. Wash waters shall be tr eated in a sediment basin or
alternative control that provides equivalent or better treatment prior to discharge;
ii. Minimize the exposure of building materials, building products, construction wastes,
trash, landscape materials, fertilizers, pesticides, herbicides, detergents, sanitary waste and
other materials present on the site to precipitation and to stormwater; and
iii. Minimize the discharge of pollutants from spills and leaks and implement chemical spill
and leak prevention and response procedures.
K. Provisions to manage the following prohibited discharges:
i. Wastewater from washout of concrete, unless managed by an appropriate control;
ii. Wastewater from washout and cleanout of stucco, paint, form release oils, curing
compounds and other construction materials;
iii. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance;
and
iv. Soaps or solvents used in vehicle and equipment washing.
L. Design details for structural stormwater controls, which include diversions and swales.
9. Identification and location of water bodies and surface waters adjacent to the site with details of
size, side slopes, capacity, and depth.
10. Project specifications (where applicable) for work related to stormwater management and
sediment and erosion control.
11. CZC Certification(s), if applicable.
12. USACOE Jurisdictional Determination, third-party wetlands delineation, and/or wetlands permit.
13. Geotechnical Report. This shall include p ercolation tests and soil boring s, or other methods
subject to approval by Georgetown County, performed by a licensed geotechnical engineer if wet
ponds, dry pond, exfiltration, infiltration, percolation, or any other subsurface system is proposed.
The percolation tests and soil boring shall be representative of the design conditions as described
in Section 4.
14. Downstream Analysis, as described in Section 4. 5, to include an exhibit showing the drainage
path from the site discharge points to the receiving waterbod y, pictures along the way of the
receiving system and points of interest, and descriptions of any concerns along the drainage path.
15. A determination that the development is in compliance with the Storm Management and Flood
Damage Protection requirements of the Georgetown County Code of Ordinances or a designated
variance.
16. Signed Georgetown County BMP Maintenance Agreement and attached Maintenance Plan as
provided in Appendix H. The person(s) or organization(s) responsible for operation and
maintenance of the facilities included in the C-SWPPP shall be clearly identified.
17. A list of all contiguous property and addressed, stamped envelopes for each property.
Page 31 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 22 of 58
18. SCDOT Encroachment permit, if applicable. Or similar permissions from the receiving property
owner if the site is contributing runoff to an existing system.
19. Response to c omments letter, with a response to each comment provided to the applicant
(resubmittals only). Provide specific locations in the submittal for each comment.
Additional information necessary for a complete project review may be required by the County as
deemed appropriate. This additional information may include items such as location of public sewers,
waterlines, septic fields, wells, etc.
All contents of the C-SWPPP and supporting documents shall be submitted electronically. Each item
listed on the Stor mwater Submittal Checklist shall be sent as a separate labeled file and sent
electronically to the Stormwater Division as described in Section 2.4 . Indicate the number of
attachments included within each email. The following items must be mailed or hand delivered: check
with proper review fees (Appendix B), addressed and stamped envelopes for each contiguous
property, signed Land Disturbance Application, signed BMP Maintenance Agreement, the C-SWPPP
signature page, and any other page requiring original signatures, stamps, or seals.
3.2 C-SWPPP Specific Requirements
Specific requirements for the C -SWPPP are described here. The County may modify the following
items for a specific project or type of project.
Specifications for a sequence of construction operations shall be contained on all plans describing the
relationship between the implementation and maintenance of sediment controls, including permanent
and temporary stabilization and the various stages or phases of earth disturbance and construction.
The specifications for the sequence of construction should, at a minimum, include:
A. Clearing and grubbing for those areas necessary for installation of perimeter controls.
B. Construction of perimeter controls.
C. Installation of sediment basins and sediment traps.
D. Remaining clearing and grubbing.
E. Utility installation and whether storm drains shall be used or blocked until after completion of
construction.
F. Road grading (if applicable).
G. Grading for the remainder of the site.
H. Final grading, landscaping, or stabilization.
I. Clean out of sediment and debris from stormwater system, to include ponds, inlets, pipes,
channels, ditches, and all other components of the system.
J. Completion of County Close-Out process.
K. Removal of sediment controls.
Page 32 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 23 of 58
3.2.1 Jurisdictional Waters and Critical Areas
If surface waters, to include wetlands, are suspected to be on-site or within 50 feet of the proposed
disturbed area, these must be located and delineated . The County will accept a wetland delineation
performed by a third party q ualified professional or a Jurisdictional Determination from the
USACOE. A USACOE wetlands permit is required when there are any proposed impacts to the
delineated surface waters.
If Critical Areas (coastal waters, tidelands, beaches, and beach/sand dune system) are within and/or
directly adjacent to the proposed disturbed area and construction site , these shall be located and
delineated. Any impacts t o Critical Areas shall be identified on the C -SWPPP with a description of
the proposed activities and the amount and type of impact(s).
A. Identified Critical Area impact(s) shall be labeled on the C -SWPPP that no work can begin in
these areas until all necessary Critical Area authorizations have been obtained for the work.
B. If a structural or water quality BMP is proposed to be installed within a Critical Area, the water
quality BMP shall be designed, installed and maintained to achieve maximum pollutant removal.
3.2.2 Discharge to a TMDL Watershed or Impaired Waters
If a TMDL Water with a pollutant of concern applicable to stormwater discharges from the proposed
land development or an Impaired Water with a pollutant of concern applicable to stormwater
discharges from the proposed land development has been established and is in effect, then the SWPPP
must address the following:
1. For construction projects that disturb less than 25 acres, carefully evaluate all selected BMPs and
their ability to control the pollutant(s) of concern.
2. For construction projects that disturb 25 acres or more, provide a written quantitative and
qualitative assessment showing that the selected BMPs will control the discharge of the pollutant,
or pollutants, of concern from constructi on and post construction within a TMDL watershed, or
to a water on the 303(d) List of Impaired Waters.
Design professionals shall determine whether runoff from the proposed land development contains
pollutants that are already causing impairment of the adjacent waterbody. These pollutant discharges
will vary from site to site. If stormwater runoff from the proposed land development will contribute
pollutants that already cause water quality impairment, the design professional must demonstrate to
the extent practicable that measures and controls will be implemented to prevent further problems to
the impairment.
There is not a specific methodology that must be followed in determining the BMPs selected and
utilized. However, the calculations and descriptions m ust show that the BMPs to be installed will
ensure that runoff from the site will not cause or contribute to further degradation of the impaired
waterbody.
The selection of BMPs to achieve the required results shall be determined through review of
monitoring studies of similar BMPs, applicable computation methods and methodologies, application
of computer models such as WASP, IDEAL or other methods acceptable to the County Stormwater
Engineer.
Page 33 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 24 of 58
Computer models can be used by designers to calculate the annual loading for the pollutant of concern
for the pre -developed condition as a baseline and the developed condition (with no increase) for
impaired waters discharge compliance.
SCDES has determined that construction activity contributes to specific im pairments. For sites that
drain to a waterbody with a TMDL or impairments for Macroinvertebrate Community (BIO),
Turbidity, Total Phosphorus (TP), Total Nitrogen (TN), Chlorophyll-a (CHLA), and Fecal Coliform
(FC) (in Shellfish Harvesting waters), specific measures have been listed in the SC DES SWPPP to
address these pollutants. They include measures such as soil testing, specific locations of portable
toilets, limiting disturbance, etc. These measures need to be included within the Stormwater
Management Plan.
If the receiving water is listed on the most current South Carolina 303(d) List of Impaired Waters, the
C-SWPPP shall be developed so that any stormwater discharges fr om the construction site do not
cause, have the reasonable potential to cause, or contribute to an excursion above any state water
quality standard.
3.2.3 Sediment and Erosion Control
Phased Erosion Prevention and Sediment Control (EPSC) Plans are required for all construction sites
with greater than five (5) acres of disturbance.
A. Projects less than ten (10) acres in disturbance are required to submit, at a minimum, a 2-Phased
EPSC Plan that includes an Initial Land Disturbance Phase and Final Stabilization phases.
B. Projects with disturbances greater than or equal to ten (10) acres are required to submit, at a
minimum, a 3-Phased EPSC Plan that includes an Initial Land Disturbance Phase, Construction
Phase, and Final Stabilization Phase.
C. Each phase is required to be identified on at least one (1) separate construction plan sheet and
contain a phase specific construction sequence.
When permitted work in a live waterway is performed, precautions sh all be taken to minimize
encroachment, control sediment transport and stabilize the work area to the greatest extent possible
during construction.
The C-SWPPP shall identify all allowable sources of non -stormwater discharges, except for flows
from firefighting activities that are combined with stormwater discharges associated with construction
activity at the Site. Non -stormwater discharges should be eliminated or reduced to the extent where
these discharges shall not cause or contribute to violations of water quality standards.
3.2.4 Special Protection Areas
Flooding problem areas exist in many locations around the County to the point that stormwate r
controls have become overwhelmed, or where controls were never adequately designed or installed
to control runoff. Special Protection Areas are those areas that were identified through the
Georgetown County Stormwater Master Plan or those areas with repo rted flooding issues that have
been identified as areas of concern. These Special Protection Areas (SPAs) can be found on the
Georgetown County Stormwater GIS map, available on the Georgetown County website.
Page 34 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 25 of 58
Those wishing to develop or redevelop lands within these protected areas shall be required to comply
with the minimum standards listed in the preceding sections as well as a more stringent set of design
criteria detailed below. These generally focus on either a water quantity (reduce or prevent frequen t
and/or extreme flooding) or a water quality problem (prevent or reduce degradation of riverine,
estuarine, coastal ecosystems or maintain a designated use(s)) . The site’s presence in a special
protection area will be identified during the pre -submittal meeting and should be discussed in the
Stormwater Management Report.
To relieve existing flooding problems, the following list of design criteria shall be required in
designated special protection areas. The requirements in conjunction with the enforcement of other
design criteria listed in the sections above are required to provide the necessary controls.
1. The post-development, peak discharge rates is restricted to one -half (1/2) the pre -development
rates for the 2- and 10-year storm event or to the downstream system capacity, whichever is less.
2. The increase in post-development runoff volumes for the 2-year frequency 24-hour duration storm
above the predevelopment volume shall be stored for a period of at least 24-hours before release.
Additional criteria may be established on a case-by-case basis.
Page 35 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 26 of 58
SECTION 4 DESIGN STANDARDS
4.1 Stormwater Management General Standards
The purpose of this section is to establish minimum engineering standards for the design, construction
and maintenance activities of land disturbance in Georgetown County . Land Disturbance shall be
approved, consistent with procedures in this Manual and the Ordinance, when the applicant has
demonstrated that the proposed development activity has been designed and shall be constructed and
maintained to meet each of the following performance standards:
1. To encourage the use of Best Management Practices, i.e. maximum use of on-site storage facilities
to reduce runoff flow rates and volumes and minimize erosion and sedimentation.
2. To design, construct, and maintain stormwater management facilities in a manner to control post-
development runoff to simulate the time discharge function for pre-development runoff provided
residual capacity is available in off-site facilities to accommodate the runoff.
3. To design, construct , and maintain stormwater management facilities in such a manner that
erosion or sedimentation does not exceed natural pre-development conditions.
4. To assure that no adverse impacts result from improper location, desi gn, and construction of
stormwater management facilities.
5. To design, construct, and maintain stormwater management facilities consistent with mosquito
objectives and programs.
6. To protect the water quality of the ocean , estuaries, and the physical characteristics of the beach
area by minimizing flow rates, volumes, and velocities of stormwater entering drainage systems
discharging to the beach.
7. To design, construct, and maintain stormwater management facilities in compliance with all
applicable state and federal regulations, including SCDES Standards for Stormwater Management
and Sediment Reduction Regulation 72-300, NPDES General Permit for Storm Water Discharges
from SMS4’S SCR030000, SC DES/OCRM Stormwater Management Guidelines for Coastal
Resources, and NPDES Permit SCR035106.
4.2 Stormwater Management Design Requirements
The design criteria presented within this Manual represent good engineering practices and should be
utilized in the preparation of the C-SWPPP. These design criteria are intended to establish guidelines,
minimum standards, and methods for sound planning, design, and review process, and are not to be
considered iron-clad rules. Alternative methods of design that meet the intentions of this Manual may
be submitted to the County for consideration.
Table 1 provides a brief overview of the design requirements for Georgetown County . This table is
intended to be used as a quick reference guide but is not all inclusive of the requirements within
Georgetown County. It is the responsibility of the permittee to ensure all design requirements within
this Manual are met.
Page 36 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 27 of 58
Table 1: Overview of Design Criteria and Requirements
Criteria Design Requirements
Size of Development
Any disturbed area equal to or over 1.0 acre, or a disturbed area of at least one-
half (1/2) acre but located within one-half mile of a coastal receiving water s,
must develop a C-SWPPP. See Section 1.3 for more details.
Water Quantity Design Storms
Post-development peak discharge rates shall not exceed pre-development peak
discharge rates for the 2-, 10-, and 25-year, 24-hour storm events. The 100-
year storm event must pass safely through the system without damage to
structures or the stormwater drainage system.
Water Quality Detention/Retention
The greater of the first one -half (1/2) inch of runoff from the entire drainage
are or the first one (1) inch of runoff from the impervious acreage must be
detained on-site on slowly released over a minimum of 24 hours; all detention
volumes must be released within 72 hours of the beginning of the rainfall event.
Land disturbance within 1,000 feet of shellfish beds must be designed to detain
the first one and one-half (1.5) inches of runoff from the disturbed area.
Emergency spillway Detention and retention basins must have an emergency spillway to discharge
flows above the 25-year, 24-hour storm event water surface elevation.
Freeboard
All BMPs must have one (1) foot of freeboard above the 100 -year, 24-hour
storm event peak water surface elevation. Alternative option to account for
20% sediment storage may be implemented for underground systems.
Coastal Zone Certification (CZC) Required for every site in Georgetown County; must get CZC before County
can issue final permit approval.
Phased Erosion and Sediment
Control Plan
Phased Erosion Prevention and Sediment Control Plan required for
disturbances over 5 acres. See Section 3.2 for details.
Construction Sediment Basin
Must be designed to meet a removal efficiency of 80 percent or 0.5 ml/L peak
settable solids concentration, whi chever is less; surface dewatering required,
porous baffles and forebays shall be used when feasible.
Downstream Analysis
Provide a map showing the drainage flow path from the site to the receiving
water body. Include pictures at the point of the site’s d ischarge and along the
downstream system.
Special Protection Areas
Reduce peak runoff rates by half for the 2- and 10-year, 24-hour storm events;
Detain the excess runoff volume difference between the pre-development and
post development conditions for the 2-year storm event for at least 24-hours.
Discharge Velocities Must be reduced to the pre-developed 10-year, 24-hour storm runoff velocity
or a non-erosive velocity.
Drainage/conveyance channels
Must be designed to convey the 10-year, 24-hour storm event with a one-half
(1/2) foot freeboard and must completely contain the 25-year 24-hour event
(for channels less than three feet in depth); velocities must not exceed 5 ft/sec
or must have permanent protection against higher velocities.
Geotechnical Report Required for most projects to identify the SHWT and infiltration rates.
Page 37 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 28 of 58
4.2.1 General Requirements
The following items are general design requirements to be met for land disturbance activities in
Georgetown County.
1. Plans, calculations, and supporting documentation as required by this Manual and the Ordinance
for th e design, construction , and maintenance of stormwater management facilities shall be
prepared and sealed by a Professional Engineer currently licensed in the st ate of South Carolina
or a Professional Land Surveyor currently licensed by the state of South Carolina when permitted
by the Ordinance.
2. Innovative approaches to stormwater management are encouraged and the concurrent control of
flooding, erosion, sedimentation, and stormwater pollution are mandatory.
3. The use of Low Impact Development (LID) in the creation of stormwater infrastructure within a
site is highly encouraged. LID can reduce construction and maintenance costs of the stormwater
infrastructure, balance growth needs with water quality protection, and create green landscapes
that add amenity value to new development.
4. Projects that are developed in phases shall require the submission of a master plan of the entire
project. The initial submittal shall control the area proposed in the initial phase to the requirements
of this Manual and establish a procedure and obligation for total site control . Applications for
individual projects shall be considered only when the phases are totally independent of or m ake
sufficient provisions for subsequent phases.
5. Linear projects, for which the use of conventional stormwater BMPs is not practical or feasible,
may reference the SCDOT Stormwater Quality Design Manual for alternative stormwater control
options. This evaluation and selected approach shall be documented in the Stormwater Technical
Report within the C-SWPPP.
6. Development should maximize the amount of rainfall that infiltrates into the soils and minimize
the amount of direct overland flow into public drainage facilities, adjoining streets, water bodies,
surface waters, and wetlands to the extent feasible. Channeling runoff directly into surface waters
is prohibited; instead runoff must be routed to reduce velocities, allow suspended solids to settle
and remove pollutants.
7. Where existing wetlands are intended as a component of an overall stormwater management
system (for quantity, use of wetlands for water quality treatment is not allowed) , the permit
application will not be approved until all necessary federal and state permits have been obtained.
8. A positive outfall for all runoff in excess of that retained shall be provided to a surface water
through appropriate easements or rights of way . If the downstream facilities are inadequate to
convey the peak discharge for the design rainfall event(s), the proposed development shall
accommodate on-site that portion of runoff above the actual capacity.
9. The soil types of a development and contiguous watershed area are of a prime consideration in
the design and maintenance of all stormwater management facilities. A Soil Erosion and Sediment
Control Plan shall be prepared and submitted as a part of the Stormwater Management Plan.
Page 38 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 29 of 58
4.2.2 Hydrologic/Hydraulic Design Requirements
A complete watershed hydrologic and hydraulic analysis must be done using a complete
model/procedure acceptable to the County. The name of the model/procedure used for the analysis
must be included in the C-SWPPP.
Design Storms
Post-development peak discharge rates shall not exceed pre -development discharge rates for the 2-,
10-, and 25-year frequency 24-hour duration storm event, using the National Resource Conservation
Service (NRCS) Type III rainfall distribution with 323 peaking factor . Discharge rates shall be
evaluated at designated boundary points identified on the drainage area maps. Boundary points must
remain at the same location from pre-development to post-development conditions.
Post-development peak discharge rates for the 100-year, 24-hour duration Type III storm event shall
be evaluated to ensure that the system can safely pass the storm event without damage to stormwater
control structures and without causing increased water elevations or flooding on adjacent properties
or to on-site structures.
Method of Runoff Rate and Volume Computations
The following methods and programs are acceptable for use in determining the peak runoff rate and
runoff volumes . Any assumptions used in the computations shall be clearly delineated . The
computation results shall be presented in a format that will permit c onfirmation of the results . For
methods not outlined below, the applicant shall provide sufficient detail to determine the accuracy of
the method or program used.
1. The design discharge rat e for a single pipe or culvert that is not part of a pipe network or
system and that drains a watershed of 2 acres or less may be calculated using the Rational
Formula.
2. Runoff calculations involving any watershed of over 2 acres, multiple sub -watersheds or
multiple drainage inlets, stormwater pipe networks, ponds, detentio n system or BMPs must
be analyzed using computer or numerical models that model complex hydrologic and
hydraulic watershed responses. For these circumstances, the NRCS/SCS method may be used.
3. Stormwater pipe systems that include one or more junctions must be included in the model.
Rainfall Data
United States Weather Service Rainfall Data compiled for Georgetown County by the South Carolina
Water Resources Commission shall be used. The SCDES CGP requires that each C-SWPPP must use
rainfall data from the South Carolina DES Stormwater Management BMP Handbook or another
appropriate source such as a local NOAA gauge. Rainfall data from the SC DES BMP manual is
provided below as well as a link to the NOAA Precipitation Frequency Data Server (PFDS) webpage.
Rainfall Data for 24-Hour Type III Storm Events (Inches)
Location 2-yr 10-yr 25-yr 100-yr
Georgetown (East) 4.6 7.0 8.5 11.1
Georgetown (West) 3.9 6.0 7.4 9.6
Page 39 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 30 of 58
NOAA PFDS : http://hdsc.nws.noaa.gov/hdsc/pfds
The Natural Resources Conservation Service (NRCS) has recently developed new rainfall
distributions that replace the standard NRSC (SCS) Type distributions. The new NRCS distributions
have default averaged curves based on geospatial location, a s well as a procedure to create custom
site-specific distributions using the Atlas 14 rainfall data . These curves may also be used . The
Stormwater Management Report should indicate what source was used for rainfall data.
Soils
Soils properties influence t he relationship between rainfall and runoff with their various rates of
infiltration. Soil maps and data can be obtained from the NRCS Web Soil Survey using the link below
to determine the Hydrologic Soil Groups (HSG).
NRCS Web Soil Survey : http://websoilsurvey.sc.egov.usda.gov/
Soil types are divided into four major HSGs denoted by the letters A through D. “A” soils are those
which have high infiltration capacity and subsequently low runoff rates. “D” soils are those with very
low infiltration capacity and very high runoff rates.
Consideration should be given to the effects of urbanization on the natural HSG. If heavy equipment
can be expected to compact the soil during construction , if fill material is brought in the raise the
ground surface elevation, or if grading will mix the surface and subsurface soils, appropriate changes
should be made in the HSG selection.
When encountering Hydrologic Soil Group A/D soils or B/D soils, either A, B, or D may be selected
based on site specific characteristics and groundwater levels . However, the HSG selected for pre -
development must be the same HSG selected for post-development.
Land Cover
Land use data shall be taken from the most recent aerial photograph and fi eld checked and updated.
The land cover and associated curve number assigned to each portion of the site and any off-site areas
as applicable should be clearly described in the Stormwater Management Report with tables and/or
figured.
Wet ponds, dry ponds intended for stormwater detention, wetlands, surface waters, and gravel areas
intended for vehicular traffic must be assigned a curve number of 98. For surfaces not clearly defined
in commonly available tables (i.e. permeable pavement), provide supporting d ocumentation of the
assigned curve number.
The County reserves the right to require verification of hydrologic and hydraulic computations by use
of a second computational method at its discretion. The County may require drainage systems to be
designed assuming future conditions or build-out of the contributing watershed.
Time of Concentration
The time of concentration (Tc) shall be determined by calculating the time for a particle of water to
travel from the most hydraulically remote point of the project’s watershed to the point of interest.
Georgetown County will accept commonly used time of concentration calculations and
methodologies.
Page 40 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 31 of 58
The maximum allowable overland (sheet flow) flow path is 100 feet.
Tailwater
The design must account for the stage of receiving waters, or the tailwater, to accurately determine
the impacts of the land disturbing activities. The applicant may use one or more of the following
methodologies to determine the tailwater conditions , or provide justification for use of other
methodologies:
Assume the next downstream pipe of the receiving system is full.
Assume the ditch is flowing 1/2 full if normally dry.
Use the 100-year Base Flood Elevation (BFE) from the FEMA maps, if reasonable.
Check the Mean High High Tide (MHHT) and the downstream location and set the tailwater
no lower than this elevation.
Examine the downstream system for high water marks.
Tailwater conditions may not be based on existing water surface elevations as examined during a field
visit. Conditions must consider water levels in the receiving system during storm events and during
wet seasons . The reasoning and justification for the tailwater depth should be included in the
Stormwater Report. The tailwater depth may be set to vary with time and for different sto rm events
provided evidence is presented to support each situation.
Discharge Velocities and Outlet Protection
Appropriate Velocity Dissipation devices and/or erosion prevention BMPs must be placed at
discharge locations and along the length of any outfall channel to provide non-erosive flow from the
outfall to a surface water so that the natural physical and biological characteristics and functions are
maintained and protected. Outlet protection measures, such as riprap, may be required to minimize
erosion and scour potential . Provide calculations or procedures utilized to select the proper outlet
protection and protection dimensions. Silt fence may not be used as an energy dissipater.
Stagnant Water Conditions
Dead end flow configurations, which create stagnant water conditions, shall not be allowed. All
BMPs shall be designed, constructed, and maintained with consideration for the proper control of
mosquitoes and other vectors.
Off-Site Runoff
Runoff from higher adjacent or upstream lands that runs into or through the site shall be considered
and provisions for conveyance of such runoff shall be included in drainage plans. As directed by the
County Engineer, upstream analysis shall be conducted to ensure the project has capacity to convey
upstream runoff and does not cause adverse upstream impacts, such as flooding.
Page 41 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 32 of 58
4.3 Stormwater BMP Design Requirements
Site designs must include Stormwater BMPs to meet the water quantity and water quality
requirements of this Manual and the Ordinance. Runoff from impervious surfaces shall be discharged
through retention basins, detention basins, filtering BMPs, Manufactured Treatment Devices (MTDs)
and/or subject to some type of BMP prior to discharge from the project site . BMP means a practice
or combination of practices determined by the design professional to be the most effective means of
preventing or reducing the amount of siltation and pollution discharged from the project site.
SCDES has developed a Stormwater Management BMP Handbook and BMP Field Manual tha t
should serve as guidance documents to design BMPs required by this Manual . The BMP Handbook
and BMP Field Manual include lists of acceptable BMPs, including their specific design performance
criteria and operation and maintenance requirements for each st ormwater practice. Copies of these
two manuals can be obtained through the local SC DES EQC office or can be downloaded from the
stormwater section of SCDES’s website. The SCDOT Stormwater Quality Design Manual may also
be referenced for linear land disturbances where more conventional BMPs may not be appl icable or
effective.
In addition to these guidance documents, the County has requirements associated with certain BMP
measures to account for the unique topographic and hydrologic conditions in the County.
4.3.1 Detention / Retention Design Requirements
Detention/Retention ponds are often referred to as dry/wet ponds and are designed to d etain
stormwater to allow pollutants to settle out and to control the release of stormwater to predevelopment
peak discharge rates. If a detention/ retention pond is used for water quantity control, this feature shall
also be used for water quality control . They may be used in addition to LID practices .
Detention/Retention ponds in Georgetown County must comply with the following design criteria:
A. Outlet structures shall be designed in accordance with accepted engineering principles, with
particular attention to appropriate hydraulics including orifice, weir, and culvert hydraulics.
If an orifice is equal to or smaller than three (3) inches in diameter, an appropriate trash rack
or downturned elbow must be installed on the orifice to prevent clogging.
B. Use a watertight pipe outlet barrel -to-riser connection. All pipes that extend th rough an
embankment shall have anti -seep collars or filter diaphragms to control the migration of soil
materials and to prevent potential embankment failure from “piping” within the backfill soil along
the conduit. This must be shown on the detail.
C. All constructed dams or embankments shall have a clay core with an excavated cutoff trench.
D. All ponds should have easements or other means of access around the entire pond for maintenance
and repair activities . This access should be at least fifteen (15) feet in width and no more than
10% in slope, measured perpendicular to the pond.
E. For water quantity control, outlet structures shall be designed to discharge a peak flow rate equal
to or less than the pre -development runoff peak flow rates for the 2-year, 10-year, and 25 -year
frequency 24-hour duration Type III storm event.
Page 42 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 33 of 58
F. The pond shall have one (1) foot of freeboard above the 100-year, 24-hour storm event peak water
surface elevation.
G. Any pond shall not overtop the banks or utilize the emergency spillway during the 2 -year, 10-
year, or 25-year 24-hour storm events.
H. If the pond is intended to be a dry pond, the pond bottom must be at least 0.5 ft above the SHWT,
as determined by a licensed geotechnical engineer.
I. If the pond is intended to be a wet pond, there must be at least four (4) feet of water between the
bottom of the pond and the NWL.
J. If the pond is intended to be a wet pond, the design shall include safety benching to reduce safety
risks. A minimum 10-foot-wide aquatic/safety bench around the perimeter of the wet stormwater
detention facility (with exception of the forebay area) with the inside edge of the shelf 6” below
the permanent pool level and the outside edge 6” above the permanent pool level with a resulting
slope of 10H:1V must be provided when site area is greater than 2 acres.
K. Inside and outside pond bank slopes shall be no steeper than 3H:1V
L. If the downstream drainage facilities are inadequat e to convey the peak discharge for the design
storm events such that the proposed land disturbance will cause increased downstream water
surface elevations, storage volume shall be added to accommodate that portion of the runoff above
the actual downstream carrying capacity and/or the outlet structure shall be sized to restrict the
peak discharge rates to accommodate downstream conditions.
M. Where a basin discharges into a stream, ditch, swale or water body, an energy dissipater shall be
installed to reduce discharge velocities to minimize soil erosion and sediment transport.
N. For detention and retention basins, an emergency spillway shall be required at an elevation above
the 25-year, 24-hour storm event peak water surface elevation to discharge flows in excess of the
25-year storm event and to safely pass the 100-year, 24-hour storm event. It should be located so
the discharge does not erode the basin or receiving channel.
O. Ponds should have permanent forebays at all locations where pipes discharge into the pond above
the normal water surface elevation.
4.3.2 Underground Detention Devices
Underground detention devi ces and systems are limited due to hig h groundwater table levels,
maintenance requirements, and other issues that may arise short and/or long term from various issues
such as maintenance, storage, and access. These requirements apply to underground systems that do
not account for infiltration or exfiltration; if infiltration or exfiltration is included in the design, refer
to Section 4.3.3 and Section 4.3.4. If underground detention is incorporated into a site design, it shall
be designed using the following criteria:
A. Underground detention systems must have pretreatment in place. The system shall not receive
runoff directly from an impervious area without pretreatment to reduce system clogging and
maintenance.
B. The maximum contributing drainage area to be served by a single underground detention vault or
tank is five (5) acres.
Page 43 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 34 of 58
C. All systems shall be designed and laid out to facilit ate maintenance. Systems should be cleaned
out (sediment and debris removal) at least once a year, but more frequently if necessary. As with
all stormwater controls, a maintenance schedule shall be submitted with the BMP Maintenance
Agreement.
D. If the underground detention system is under a roadway, driveway, parking lot, building, or other
structure, a load analysis must be performed for the system by a qualified engineer to show an H-
20 loading.
E. Access must be provided over the inlet pipe and outflow structures. Access openings can consist
of standard frame, grated and solid cover, or preferably a removable panel. Access or inspection
ports shall be available at least every 100 feet.
F. All underground detention systems shall accommodate a volume reduction of at least 20% due to
sediment storage. That is, calculations shall show that the General Design Standards in Section
4.2 can be met if the storage capacity of th e underground detention system is decreased by 20%
due to sedimentation.
G. Appropriate anchoring is required to prevent flotation of the underground storage tank.
H. A geotechnical report is required to determine the seasonal high -water table (SHWT) at the
proposed location of the underground detention. If the SHWT is higher than the bottom of the
underground detention, the system must be wrapped in an impervious layer or designed such that
the SHWT elevation is the lowest elevation of storage used in the calculations.
I. System configurations which create stagnant water conditions are to be avoided.
J. The slope of the bottom of the infiltration practice shall not exceed 5 percent.
K. The system shall have an emergency overflow.
L. Georgetown County reserves the right to require phased inspections from the manufacturer or
authorized representative at critical install points (e.g. installation of inspection ports, installation
of bedding and prior to covering the device) and provide documentation of the inspections to
Georgetown County.
M. The County must be notified at least three (3) business days prior to the installation of any
underground practices. The County may require that a County Inspector or manufacturer’s
representative be onsite to verify installation.
N. Georgetown County reserves the right to require that the feasibility of underground devices be
evaluated by a soil scientist, geotechnical engineer, or other individual certified by the State of
South Carolina in water table estimation.
4.3.3 Infiltration BMP Requirements and Soil Testing
Infiltration BMPs are systems in which surface water is directly delivered to the system, which relies
on infiltration for the treatment and release of stormwater runoff from the BMP . These systems may
not rely solely on infiltration for the release of stormwater.
1. Design
A. Permanent infiltration practices, when used, shall be designed to accept, at a minimum, the
first one (1) inch of runoff from all impervious areas of the site.
Page 44 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 35 of 58
B. Soil testing with soil borings performed by a licensed geotechnical engineer must be done to
determine the infiltration rates, soil composition, and SHWT.
C. Infiltration practices are limited to soils having an infiltration rate of at least 0.5 (one-half)
inches per h our. On-site soil borings and textural classifications must be accomplished to
verify the actual site and seasonal high water table conditions when infiltration is to be
utilized, as described below.
D. Areas draining to these practices must be stabilized and vegetative filters or other pretreatment
measure must be established prior to runoff entering the system. Infiltration practices shall not
be used if a suspended solids filter system does not accompany the practice . If vegetation is
the intended filter, there shall be at least a 20 foot length of vegetative filter prior to stormwater
runoff entering the infiltration practice.
E. The bottom of the infiltration practice shall be at least one (1.0) foot above the SHWT, whether
perched or regional, determined by direct piezometer measurements, which can be
demonstrated to be representative of the maximum height of the water table on an annual basis
during years of normal precipitation, or by the depth in the soil at which mottling first occurs.
F. The infiltration practices shall be designed to completely drain of water within 72 hours.
G. The practice shall have one (1) foot of freeboard above the 100 -year, 24-hour storm event
peak water surface elevation.
H. Infiltration practices greater than 3 feet deep shall be locate d at least 10 feet from basement
walls.
I. Infiltration practices designed to handle runoff from impervious parking areas shall be a
minimum of 150 feet from any public or private water supply well.
J. The slope of the bottom of the infiltration practice shall not exceed 5 percent.
K. The practices shall not be installed in fill material as piping along the fill/natural ground
interface may cause slope failure.
L. An infiltration practice shall not be installed on or atop a slope whose natural angle of incline
exceeds 20 percent.
M. If the infiltration practice is entirely or partly underground:
i. It shall be designed for the prevention of clogging by fine materials and for ease of
cleaning with conventional vacuum cleaning equipment. This may include but not
necessarily be limited to wrapping of the Infiltration BMP ( perforated
pipes/chambers/trenches) with an appropriate nonwoven geotextile fabric and providing
sufficient clean outs for the system.
ii. Systems shall have an overflow to a positive drainage system with a control device, if
necessary, between the subsurface system and the positive drainage system. The overflow
pipe shall be sized for the allowable discharge with measures to provide a non -erosive
velocity of flow along its length and at the outfall.
iii. Underdrains are required.
iv. Clean outs will be provided, at a minimum, every 100 feet along the infiltration practice
to allow for access and maintenance.
Page 45 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 36 of 58
v. If the infiltration practice is under a roadway , driveway, parking lot , building, or other
structure, a load analysis must be performed for the system by a qualified engineer to show
an H-20 loading.
vi. In lieu of the requirement to provide one (1) foot of freeboard, the storage capacity of the
system should design for a 20 percent reduction in storage space to account for sediment
deposition. That is, calculations shall show that the General Design Standards in Section
3.1 can be met if the storage capacity of the underground detention system is decreased
by 20% due to sedimentation.
2. Soil Testing – Infiltration Rates and SHWT
A. Soil testing for infiltration rates shall be performed by a licensed geotechnical engineer
B. A minimum of one (1) location shall be tested for infiltration rates for each BMP. Additional
locations may be needed depending on the size and layout of the BMP. In general, these tests
shall be conducted in the center of the BMP.
C. The initial test elevation location shall be at the same contour elevation as the bottom/invert
of the Infiltration BMP. Tests shall also be conducted to a depth 2 feet below the bottom/invert
of the BMP.
D. Infiltration BMPs shall be designed and validated on the basis of actual test data . Tests shall
be consistent as to soil conditions, proposed Infiltration BMP elevations, Infiltration BMP
locations and water table depths with the proposed Infiltration BMP system.
E. The following tests are allowable to determine infiltration rate for soils (Other test methods
must be approved by County):
i. Laboratory Permeameter Test for saturated hydraulic conductivity on undisturbed soil
samples (ASTM D 5084).
ii. Double Ring Infiltrometer Test to estimate the initial vertical unsaturated permeability
data of the upper soil layer (ASTM D 3385).
iii. Constant Head Test in soils with permeability that allow keeping the test hole filled with
water during the field test (AASHTO T 215).
iv. Falling Head Test in areas with excellent soil percolation where keeping the test hole filled
with water is not feasible during the test.
3. The County must be notified at least three (3) business days prior to the installation of a ny
underground infiltration practices . The County may require that a County Inspector or
manufacturer’s representative be onsite to verify installation.
4.3.4 Underground Exfiltration BMPs Requirements and Soil Testing
Exfiltration BMPs are underground systems, such as perforated pipes, in which stormwater runoff is
delivered to the system via inlets, catch basins, or other such structures and it allowed to slowly release
into the surrounding soils.
1. Design
Page 46 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 37 of 58
A. Soil testing with soil borings performed by a licensed geotechnical engineer must be done to
determine the infiltration rates, soil composition, SHWT, and a determination of the Hydraulic
Gradient using ground water profiles.
B. The bottom of the exfiltration trench shall be a minimum of one (1) foot above the SHWT.
C. Design must account for 20 percent reduction in storage space to account for sediment
deposition. That is, calculations shall show that the General Design Standards in Section 3.1
can be met if the sto rage capacity of the underground detention system is decreased by 20%
due to sedimentation.
D. Exfiltration systems must be accessible from catch basins spaced no further than 100 feet apart
to allow for maintenance . Catch basins shall not be smaller than 2 f t by 3 ft and the system
must terminate at a catch basin.
E. The slope of the exfiltration system shall be a slope of zero percent (0%) between the catch
basins.
F. The system shall have an emergency overflow.
G. When rock is part of the system, the treatment volum e shall be calculated using the void
volume of the rock used in the exfiltration trench and the volume of the pipe or underground
chamber.
H. The voids ratio of No. 57 stone shall not exceed 40% and washed No. 57 stone shall not exceed
33%. Only washed stone or rock without fines are acceptable for use in the exfiltration trench.
I. Filter fabric must be laid perpendicular to the direction of the trench.
J. Installation shall require continuous on -site observation by the Engineer or qualified
professional and Site Inspection Reports shall be provided to the County for the entire
installation of the exfiltration system.
2. Soil Testing
A. The permeability of the soil must be greater than one (1) in/hr.
B. Soil testing for infiltration rates shall be performed by a licensed geotechnical engineer.
C. The initial test elevation location shall be at the same contour elevation as the bottom /invert
of the Exfiltration BMP.
D. Exfiltration BMPs shall be designed on the basis of actual test data . Tests shall be consistent
as to soil conditions, proposed Infiltration BMP elevations, Infiltration BMP locations and
water table depths with the proposed Infiltration BMP system.
E. The following tests are allowable to determine infiltration rate s for soils (Other test methods
must be approved by County):
i. Laboratory Permeameter Test for saturated hydraulic conductivity on undisturbed soil
samples (ASTM D 5084).
ii. Double Ring Infiltrometer Test to estimate the initial vertical unsaturated permeability
data of the upper soil layer (ASTM D 3385).
Page 47 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 38 of 58
iii. Constant Head Test in soils with permeability that allow keeping the test hole filled with
water during the field test (AASHTO T 215).
iv. Falling Head Test in areas with excellent soil percolation where keeping the test hole filled
with water is not feasible during the test.
3. The Recover Time Calculation shall be based on Darcy’s Law, Q=KiA
A. The Recover Calculation can only consider horizontal flow through the one third of the side
area of the exfiltration trench that is filled with water at any given time f or any given storm
event.
i. The Recovery Calculation must have a factor of safety of 2.
B. The County must be notified at least three (3) business days prior to the installation of any
underground infiltration practices. The County may require that a County Inspector be onsite
to verify installation.
4.3.5 BMP Maintenance Plan
The effectiveness of each BMP implemented on a site depends upon appropriate design and
maintenance. The C-SWPPP must contain a BMP Maintenance Plan (considered to be Attachment
A) and Geor getown County Stormwater Management BMP Maintenance Agreement, included in
Appendix H of this Manual, for each BMP incorporated into the stormwater system. The maintenance
plan must address both maintenance and monitoring procedures as outlined in the SC DES BMP
Handbook and Field Manual, which, when followed, will prevent:
1. Blocking hindering, or obstructing the natural or intended flow of surface waters
2. Improper operation of stormwater retention or impoundment device used for water quality
improvement
3. Any condition that would damage the County’s stormwater collection system or the quality of
the County’s waters
4. Any conditions specifically declared to be dangerous to the public health, safety, and general
welfare of the County’s inhabitants
In addition to the above maintenance procedures, Attachment A should also include a BMP Exhibit
that shows the location of all stormwater features and BMPs (including pipes, catch basins,
manholes, ponds, outfall structures, emergency spillways, channels, riprap, MTDs, inlet filters,
water quality devices, underground detention, bioretention areas, etc.). Nonstandard BMPs should
include details (outfall structures, underground detention, proprietary systems, etc.) so that BMPs or
proprietary systems can be replaced or rebuilt as originally designed if needed. The BMP Exhibit
should be on 8.5x11 inch pages (several pages if needed for legibility). Site features should be
shaded back so that stormwater features appear bold and clearly visible.
Once approved by the County, the original signed BMP Maintenance Plan and Exhibit will be
placed at the County’s Register of Deeds Office. The permittee shall set up an appointment with the
Register of Deeds office to record the signed BMP Agreement and Maintenance Plan.
Page 48 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 39 of 58
4.4 Water Quality Requirements
Water quality control is also an integral component of stormwater management and must be provided
for all new impervious area on the site. The following design criteria are established for water quality
protection. The site must capture and slowly release the greater of: one (1) inch over the impervious
area on the site, or one -half inch over the entire site . Land disturbance within 1,000 feet of shellfish
beds must be designed to capture and slowly release the first one and one-half (1.5) inches of runoff
from the disturbed area.
Calculations must be provided showing the required treatment volume for each of these conditions,
with the greater of the two volumes clearly identified . If there is more than one method of water
quality treatment, calculations should be shown for the area draining to each BMP. The calculations
should show a direct product of the area multiplied by the two rainfall amounts, not accounting for
land use or soil conditions. Calculations or hydrographs must show that this volume is released over
a period of at least 24 hours, with the volume being completely released within 72 hours of the
beginning of the storm event.
Other design standards may be acceptable to the County if they achieve an equivalent removal
efficiency of 80 percent for total suspended solids based on annual removal. These will be evaluated
on a case-by-case basis.
Design MTDs to treat, at a minimum, the peak flow rate of the stormwater runoff from the 1.8 -inch,
1-year, 24-hour storm event for the entire drainage area to the BMP. Refer to SCDOT Supplemental
Technical Specification for Stormwater Manufactured Treatment Devices (MTDs) SC -M-815-13 or
latest revision for design requirements.
4.5 Downstream Analysis
Downstream analysis shall be required for all new development and redevelopment sites to determine
the downstream effects from any development activity . The downstream analysis shall include the
assumptions, results and supporting calculations to show safe passage of post -development design
flows downstream. The analysis of downstream conditions in the report shall address each discharge
point along the project site’s boundaries at which runoff exit s the property. The analysis shall focus
on the portion of the drainage channel or surface water immediately downstream from the project. In
calculating runoff volumes and discharge rates, consideration may need to be given to any planned
or known future upstream land use changes.
Engineering analysis shall be implemented to investigate the downstream effects from any
development activity. This analysis shall extend downstream to the ultimate receiving water body or
to the point in the watershed downstream of the site where the area of the site comprises 10% of the
total drainage area. The analysis needs to identify points of concern. The following are typical points
of concern to consider when conducting a complete downstream analysis to the ultimate outfall:
1. The first downstream road crossing.
2. Any downstream road crossing or system, or any overbank areas that shows evidence of being
undersized or of receiving erosive or damaging flows.
3. Downstream development.
Page 49 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 40 of 58
4. Location of known existing flooding, drainage, or erosion problems.
5. Any point as directed by the County.
At each point of concern , the engineer needs to take a photograph and document any concerning
observations or evidence of existing issues. The analysis shall determine whether the proposed
development will have the potential to increase flooding, drainage, or erosion impacts to downstream
properties or road crossings during the 100-year, 24-hour storm event.
If the downstream analysis determines that the development of a particular site may contribute to
flooding, drainage, or erosion problems, then at least one the following im provements shall be
implemented:
1. On-site water quantity control. Control of runoff peak discharges and volumes in excess of the
requirements of this Manual to prevent downstream impacts.
2. Off-site water quantity control. Use of off-site publicly or privately owned facility to prevent
adverse downstream impacts. Hydrologic and hydraulic modeling are required to support the
design and the owner/entity must provide written acceptance of such an agreement.
3. Improvements to the downstream storm water conveyance system. Increase the conveyance
capacity or implement other improvements to the downstream system. Hydrologic and hydraulic
modeling are required to support the design and the owner/entity must provide written
acceptance of such an agreement. Evidence must be provided that these improvements will not
cause other downstream or upstream impacts.
4.6 Sediment and Erosion Control Requirements
The purpose of the Sediment and Erosion Control Plan is to provide effective measures to control
erosion and sedimentation ca used by the r emoval of ground surface cover. Effective erosion and
sediment control design requires consideration of stormwater flow and soils to be encountered. Proper
design includes measures for erosion control and provi sions for the establishment of vegetation that
shall help avoid erosion problems during and after development activities. Alignment, grades, area of
disturbed soil and bank slopes are based upon soil erodibility, climate exposure, geology, proposed
vegetative restoration and expected maintenance.
Standards and Guidelines for Design
A. Slopes shall be protected from erosion by quick establishment of vegetative cover, erosion control
blankets, turf reinforcement mats, benches, terraces, slope protection structures, mulches,
polyacrylamide (PAM), or a combination of these practices as required.
B. Except as provided below, i nitiate soil stabilization measures as soon as practicable whenever
land-disturbing activities have been temporarily or permanently ceased, but in no case more than
fourteen (14) days after land -disturbing activity in that portion of the construction site has
temporarily or permanently ceased.
i. Where snow cover or frozen ground conditions preclude stabilization by the 14th day,
stabilization measures shall be initiated as soon as practicable.
Page 50 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 41 of 58
ii. Where construction activity on a portion of the construction site is temporarily ceased, and
earth-disturbing activities shall be resumed within fourteen (14) days, temporary stabilization
measures do not have to be initiated on that portion of the construction site.
C. Drainage channels and conveyance measures shall be designed to avoid erosion problems. Wide
channels with flat slopes lined with grass or other vegetation should be used where practical. All
conveyance measures shall be designed to meet the following requirements/standards:
i. Each conveyance measure shall be stabilized and capable of handling the 10 -year 24-hour
storm event with non-erosive flow conditions during construction and post-construction.
If the velocity exceeds five ( 5) feet/sec, then permanent velocity dissipation measures,
devices, and/or erosion prevention BMPs shall be installed to provide non -erosive flow
conditions.
ii. Complete stabilization of stormwater conveyance channels within seven ( 7) days of the
completion of channel construction. Examples of vegetative and non-vegetative stabilization
techniques include channel liners, rolled erosion control products (e.g., erosion control
blankets and turf reinforcement mats), riprap, geotextiles, or other armoring materials that are
suitable for use in areas with concentrated or channelized flow. Application of mulch, hydro-
mulch, tackifier, or similar erosion prevention practices that are erodible, conveyable, or that
obstruct flow when used in areas with concentrated or cha nnelized flow in stormwater
conveyance channels is prohibited.
iii. Design channels to avoid disturbed areas and to reduce erosion. Divert concentrated flows of
off-site stormwater running onto the site and within the construction site to avoid contact with
soils exposed during construction, unless infeasible. Prevent erosion of channel embankments,
outlets, adjacent streambanks, slopes and downstream waters during discharge conditions
through the use of velocity dissipation devices (e.g., check dams, sediment t raps, riprap, or
grouted riprap at outlets) within and along the length of any constructed stormwater
conveyance channel, and at any outlets to provide a non-erosive flow velocity.
iv. New point discharges onto adjacent property where there was not a point discharge previously
are not allowed, unless written permission from the adjacent property owner is provided. A
twenty (20) foot minimum buffer shall be provided, where feasible, between the property line
and the discharge point. Level spreaders, plunge pools , etc. shall be provided when the
proposed outlet is near the property line and not directed to an existing outfall, such as a creek
or ditch. All outlets from a storm sewer system shall not discharge on fill slopes.
v. Appropriate velocity dissipation devices and/or erosion prevention BMPs shall be placed at
discharge locations and along the length of any outfall channel to provide non -erosive flow
from the structure to a surface water so that the natural physical and biological characteristics
and functions are maintained and protected. Silt fence may not be used as an energy dissipater.
D. Stormwater runoff and drainage to a single outlet from land disturbing activities, which disturb
ten (10) acres or more, shall be controlled during the land disturbing activity by a sediment basin
where sufficient space and other factors allow these controls to be used until the final inspection.
The sediment basin shall be designed and constructed to accommodate the anticipated sediment
loading from the land disturbing activ ity and meet a removal efficiency of eighty (80) percent
suspended solids or 0.5 ml/L peak settable solids concentration, whichever is less. The efficiency
Page 51 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 42 of 58
shall be calculated for disturbed conditions for the 10-year, 24-hour design event. In addition, the
sediment basin shall be designed to meet the following requirements:
i. Consider public safety as a design factor for the sediment basin, and alternative sediment
controls must be used where construction site limitations would preclude a safe design.
ii. The County may on a case-by-case or watershed-by-watershed basis require the use of a larger
storm event and/or a larger storage volume when designing sediment basins or equivalent
sediment control BMPs.
iii. Unless infeasible, properly design, install and maintain po rous baffles, or similar control
measures capable of enhancing settling capabilities and restricting the accumulation of
sediment around the outlet structure, in all temporary sediment traps and sediment basins to
reduce velocity, turbulence, and improve sediment trapping efficiency.
iv. Unless infeasible, sediment forebays, or similar control measures capable of providing
sediment trapping at inlets of sediment basins , such as porous baffles, should be installed as
practicable based on sediment storage requirements of each sediment basin.
v. Unless infeasible, each sediment basin should be equipped with a cleanout stake indicating
when the basin is to be cleaned.
vi. When discharging from sediment basins, utilize outlet structures that only withdraw water
from near th e surface of the basin or impoundment unless infeasible. This outlet structure
should be capable of conveying the flow for the 10 -year, 24 -hour storm event. Select an
appropriate riser structure which operates in weir or barrel flow control and prevent
orifice/riser flow control.
vii. Detention basins may also be used to trap sediment during and after development. When used
for this purpose, the basin shall continue to detain stormwater in accordance with the hydraulic
design criteria, but storage volume for stormwater shall be required to account for the volume
lost to sedimentation. Sediment shall be removed periodically to ensure the intended
performance of the basin.
E. Good stands of existing vegetation adequate to control erosion shall be preserved wherever
possible. Regeneration of trees and other large vegetation should be encouraged wherever
possible.
F. Inlet protection shall be provided at all existing and newly installed inlets that receive stormwater
runoff from the disturbed areas.
G. Outlet protection shall be provided at all existing and newly installed outlets, within the
construction site’s boundary, that discharge stormwater runoff from the disturbed areas. Silt fence
shall not be used as outlet protection.
4.7 Vector Control
All BMPs shall be designed, constructed and maintained with consideration for the proper control of
mosquitoes and other vectors. Practices may include, but are not limited to:
Page 52 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 43 of 58
1. The bottom of retention and detention ponds should be graded and have a slope not less than 0.5
percent.
2. There should be no depressions in a normally dry detention facility where water might pocket
when the water level is receding.
3. Normally dry detention system and swales should be designed to drain within 72 hours.
4. Normally wet detention and retention systems should have a permanent pool of at least four (4)
feet to discourage the production of mosquitos and other vectors.
5. An aquatic weed control program should be utilized in permanently wet structures to prevent an
overgrowth of vegetation in the pond. Manual harvesting is preferred.
6. Fish may be stocked in permanently wet retention and detention ponds.
7. Normally, dry swales and detention pond bottoms should be constructed with a gravel blanket or
other measure to minimize the creation of tire ruts during maintenance activities.
4.8 Easements
All stormwater BMPs, storm sewers, storm water conveyance drainage systems , and open channels
must be constructed within either public rights-of-way, or public or privately owned easements. The
easement shall conform substantially in relation to the lines of the system and be of sufficient width
to convey stormwater . Adequate access for maintenance and equipment shall be required and
provided. No approval will be given for the construction or improvement of any public storm sewer,
storm water conveyance systems or open channels without provision of suitable permanent easement
or right -of-way. Restriction on easements shall include prohibiting all fences and structures that
would interfere with access to the easement areas and/or the maintenance function of the drainage
system. Maximum allowable cross slope for any easement is 10H:1V.
1. Existing Easements: Each existing easement to be used shall be shown on the plans included in
the C-SWPPP submittal package. The information on the plans shall include the deed book and
page number of the recorded instrument. All restrictive clauses as to the use of the easement
shall be noted on the plan adjacent to the specific easement. The restrictions may include but are
not limited to:
Utility (gas, electric, telephone, and water) purposes only,
Drainage purposes only; and,
Sanitary sewer purposes only.
Construction of storm water conveyance drainage systems will not be permitted in existing
exclusive gas, electric, water, telephone, or sanit ary easements unless a drainage easement is
acquired overlapping the existing easement with approval from the County and the affected utility.
2. Culvert/Buried Pipe Easement Widths : Drainage and maintenance easements shall provide
adequate room for a contractor or owner to construct and perform maintenance of the stormwater
structure or feature. Minimum drainage easement widths for buried pipes or culverts shall be as
follows:
Page 53 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 44 of 58
Stormwater Pipe Easement Widths
Pipe Size (inches) Maximum Depth to
Invert (ft)
Width of Drainage
Easement (ft)
15-18 4.0 20
24-36 6.0 26
36-54 7.0 30
>54 9.0 36
Notes: 1. Drainage easement width(s) shall be increased by six (6) feet for every additional
foot of depth exceeding the maximum depth to invert shown.
2. For pipe sizes not specifically listed above, the easement width and depth to invert
shall be that of the next size up.
3. For larger pipe sizes and/or multiple lines of pipe easement width shall be as
determined by the Director of Public Works.
3. Open Channel Easement Widths: Drainage and maintenance easements for open channels shall
be dependent on the size of the channel . For those open channels three (3) or less in depth, the
easement width shall be calculated based on the following equation:
W = (Depth of Swale x 6) + 10 Rounded up or down to a 5’ increment.
Where:
3:1 Slope of the swale on each side
5’ access is provided on each side
For those open channels greater than three (3) feet in depth, the easement width shall be calculated
based on the following equation:
W = B + ((Depth of channel x 2) + (12’+5’)) Rounded up to the next 5’ increment
Where:
B = bottom width of ditch
12’ = Access for equipment, provided on one side
5’ = Access opposite side of equipment access
4. Stormwater BMPs: Access easements shall be a minimum of 15 feet in width and must allow for
access of the entire practice for maintenance and repair activities.
Any variation from the above prescribed easement widths shall be documented and explained in the
Stormwater Management Report. In no case shall any proposed pipe, culvert, open channel, or BMP
have an easement of less than ten (10) feet in width.
Page 54 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 45 of 58
SECTION 5 STORM SEWER COLLECTION SYSTEM
Effective drainage of roadways is essential to the maintenance of roadway service level and to traffic
safety. Water on the pavement can interrupt traffic, reduce skid resistance, increase potential for
hydroplaning, limit visibility due to splash and spray, and cause difficulty in steering a vehicle when
the front wheels encounter puddles.
Design criteria for the collection and conveyance of runoff on public roadways are typically based on
roadway classification and reasonable frequency of traffic interference. Roadway collection systems
are comprised of roadway sections, gutters to collect runoff, inlets to capture runoff, and stormwater
pipes to convey the runoff. This section presents guidance for the design of surface drainage, gutter
flow, inlet capacity, and storm sewer capacity. Georgetown County and SCDOT requirements should
be followed as applicable.
5.1 General Design Criteria
Stormwater systems shall be designed to convey the 25 -year, 24 -hour design flow under non -
surcharged conditions. Stormwater culverts under arterial and multi-lane collector roadways shall be
designed to convey the 50 -year, 24-hour design storm. Convey shall mean to pass the flow without
any backwater effects on the upstream system.
If the stormwater system is part of a roadway to be accepted by the SCDOT, the system design is
governed by SCDOT design criteria.
5.2 Gutters
There are various types of gutter sectio ns available for use in roadway design. The gutter type may
be determined by the needs for additional carrying capacity to accommodate the allowable spread or
the requirement for safe passage of pedestrian traffic. The following types of gutter sections ar e
allowable for use in Georgetown County:
1. Conventional Gutters
2. Composite Gutters
3. Valley Gutters
These gutter sections shall be designed based on the design criteria in the HEC-22, Urban Drainage
Design Manual (Federal Highway Administration (FHWA), 2009) and AASHTO’s Drainage Manual
(American Association of State Highway Transportation Officials (AASHTO) 2014). Other gutters
deemed practical and technically sound to meeting the criteria of this design manual may be submitted
prior to design commencement for approval by the County Stormwater Manager on a case-by-case
basis.
5.3 Inlets
Inlet design and location limit the amount of inundation, or spread, on a roadway. It is important that
the spread of flow, the distance from the face of the curb to the edge of the flow in the roadway, does
not impede traffic or cause a safety concern. General design criteria for inlets are as follows:
Page 55 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 46 of 58
1. For local and single -lane collector roadways, the total spread (both sides) of runoff should not
exceed 16 feet at any given cross section, and in no case be greater than 10 feet on one side of the
street
2. For arterial and multi-lane collector roadways, the spreads should not exceed one-half of the travel
lane on a two-lane roadway and may encroach a full travel lane on a four-lane roadway
3. No curb overtopping may occur in sags
4. Depth of spread shall not exceed 6 inches during the 100-year, 24-hour storm event
5. Inlet spacing shall not exceed 400 feet
Inlets accepted by Georgetown County can be divided into three categories:
1. Curb-opening inlets: vertical openings in the curb covered by a top slab . Curb inlets should be
used on roadways where the expected flow depth at the curb is sufficient for the inlet to perform
efficiently.
2. Grate inlets: openings in the gutter covered by one or more grates. Grate inlets intercept all gutter
flow that passes over the grate if the grate is sufficiently long and the gutter flow velocity is low.
3. Combination inlets: inlets that include both a curb opening and a grate inlet and act as a single
unit. Combination inlets do not appreciably increase the capacity of a grate alone, but can account
for larger amounts of debris without decreasing the inlet capacity.
The placement of two inlets side by side is referred to as a double inlet and are acceptable for use.
Capacity, size, and efficiency shall all be accounted for when designing inlets. These inlets shall be
designed based on the design criteria in the HEC-22, Urban Drainage Design Manual (Federal
Highway Administration (FHWA), 2009) and AASHTO’s Drainage Manual (American Association
of State Highway Transportation Officials (AASHTO) 2014). Other inlets deemed practical and
technically sound to meeting the criteria of this design manual may be submitted prior to design
commencement for approval by the County on a case-by-case basis.
5.4 Conveyance System
Stormwater conveyance systems consists of both open and closed conduits which convey stormwater
to outlets. These systems must be designed to accommodate surface runoff from the 25-year, 24-hour
storm event with no damage to physical facilities and minimum interruption of normal traffic.
The conveyance system shall have a maximum reliability of operation with respect to being
structurally sound to its environment where it is placed and performing hydraulically as intended for
the entire life of design. The system shall require minimum maintenance (cleaning and clearing of
obstructions) and must be accessible for maintenance operations. The system shall be adaptable to
accommodate future expansion with minimal additional cost and design.
Site design, swales, and natural flow features should be used whenever possible to reduce the need
for extensive storm sewer systems.
5.4.1 Stormwater Pipes
1. Stormwater Pipe Materials
Page 56 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 47 of 58
Culverts and closed storm drainage systems may be constructed using any of the materials listed
in this section . In selecting the culvert material, consider structural requirements and corrosion
potential at the site as well as hydraulic requirements. Alternative materials may be considered by
the County Stormwater Manager if specifications are provided showing it s comparable strength
and longevity to the products listed herein.
A. Reinforced Concrete Pipe (RCP)
RCP pipe is required in all Georgetown County rights -of-way. It should meet SCDOT
Specifications. County staff shall be notified prior to installation of pipe in Georgetown
County rights-of-way and may require that County Staff be on site during installation.
B. Concrete Box Culverts
Cast in place or precast concrete box cul verts are acceptable . Project plans should include
structural details for cast in place concrete, or shop plans for precast that have been signed
and sealed by a competent licensed professional engineer in the State of South Carolina.
Concrete boxes must meet SCDOT standards.
Prefabricated culvert structures such as CONSPAN® or similar structures are acceptable if
designed and installed in accordance with the manufacturer's recommendations. Project plans
should include structura l details and shop plans that are signed and sealed by a competent
licensed professional engineer in the State of South Carolina.
C. High Density Polyethylene (HDPE) Pipe
HDPE pipe culverts and storm drainage systems are acceptable outside of County Road rights-
of-way and should be designed and constructed in accordance with the manufacturer's
recommendation. HDPE pipe culverts and storm drainage systems shall meet SCDOT
standards.
2. Minimum Size
All pipes used as part of the stormwater conveyance system should be circular in shape when
possible. Elliptical and box culverts may be accepted when necessary, but in no case shall any
smallest dimension be less than 15 inches if the pipes are to become part of the public stormwater
system. Pipes shall be designed and installed to meet the manufacturer’s recommendations for
minimum depth of cover.
3. End Treatments and Transitions
Acceptable end treatments may consist of, but are not limited to , end pipe with riprap, concrete
headwalls, flared end sections, DOT appr oved safety ends, and any other end treatment that is
approved by the County or County appointed designee . HDPE flared end treatments are not
allowed.
Transitions between pipes of dissimilar materials shall requires a Dissimilar Materials Adapter
incorporating a geotextile coupler with mastic coating and stainless steel straps that is properly
backfilled per the manufacturer’s installation instructions.
4. Installation
All excavations and trenches shall be clean, dry and free of debris before placing pipe. Minimum
compaction shall be 90% SPD for all pipes and structures, unless higher compaction levels are
Page 57 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 48 of 58
required by the design engineer . Verification of compaction throughout the pipe’s backfill zone
trench shall be provided by a licensed geotechnical engineer. Open graded backfill such as washed
stone shall be wrapped with a minimum 8-ounce non-woven geotextile to prevent migration of
fines into the backfill . The County must be notified at least 24-hour notice prior to installation ;
the County may require that a County Inspector be onsite to verify installation.
5. Final Inspection
The permittee shall notify GTC Stormwater Division at the end of the project for a final
inspection. A final inspection must pass in order to close the permit and start the warranty
period. If a final inspection is not conducted and approved, the permittee shall be responsible for
any and all failures. Another inspection shall be made at the end of the 1-year warranty period.
If at any time during the warranty period the encroachment is not consistent with the original
approved permit, the permittee will be responsible for complying with the original
encroachment permit requirements.
In addition, all newly constructed pipe systems shall be visually inspected, with 100% of the pipe
runs video inspected. Joints shall all be panned and inspected and any visible issues such as joint
separation, cracking, holes in pipe, or excessive deflection s hall be noted. This should be
completed and provided to the County before the final inspection is scheduled.
6. Design
A. Design culverts to support a minimum of an AASHTO HL-93 live load together with the
appropriate dead load. Heavier live loads may be required if conditions dictate.
B. Bury depths greater than 15 feet shall have written approval by the County Engineer or
County appointed designee.
C. Minimum life expectancy for all culvert materials should be 75 years as certified by the
manufacturer. This shall include meeting the design requirements on which the design life is
based, such as bedding requirements.
D. Pipe sizes and slopes must be designed to ensure that the flow velocity increases progressively
at inlets, bends, or other changes in geometry or configuration. Designs shall not allow a larger
pipe to discharge into a smaller pipe, regardless of the pipe capacity.
E. Pipes that are expected to be partially or completely submerged for any part of the year must
be RCP.
F. Equalizer pipes to be used between interconnected ponds must be at least 24 inches in diameter
and no longer than 600’ in length . Junction box access with no inlets should be provided at
least every 100’ for maintenance. The equalizer pipes should have 0% slope with no other
stormwater inlets or pipes connected.
G. Storm drainage pipe discharging into wet ponds shall have the discharge invert above the
permanent pool elevation and rip -rap or other energy dissipation structures shall be placed
from the outlet point to one (1) foot below the normal pool elevation. Submerged stormwater
systems shall be avoided and shall only be permissible with a variance and approval by the
County. Submerged pipes must comply with the following:
a. Pre-treatment required for any inlet connected to a submerged pipe system. The BMP
owner will be responsible for cleaning and maintaining any inlet insert devices.
Page 58 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 49 of 58
b. Catch basins must have a 1’ sump in the bottom.
c. Details and a narrative shall be included in the BMP Maintenance Plan explaining the
pipe and pond pump down plan for pond and stormwater system maintenance.
d. A third-party inspector is required to document installation of all submerged runs with
pictures/videos/reports. A report of the installation shall be submitted and certified by
the engineer of record prior to County acceptance of infrastructure.
e. Pipes are to be inspected before installation and all defective pipes removed from site
– provide in report
f. Pipes must be gasketed and joints wrapped a minimum of 18” in either direction
g. A third-party geotechnical professional must confirm compaction around the pipe in
6” lifts at 95% modified proctor
h. Georgetown County Stormwater shall be provided 48 hours’ notice and given the
opportunity to view installation of all submerged runs.
H. Manholes shall be located at pipe junctions; changes in alignment, size, and slope; and ends
of curved sections. Manholes shall be placed at intervals not to exceed 100 feet.
I. Pipe alignments shall be straight when feasible . Long ra dius curves may be allowed to
conform to street alignments; short radius curves may be used on larger pipes to reduce head
losses at junctions. These curves may be produced by angling the joints (keep this at a
minimum to maintain a tight joint) or by fab ricating beveled heads. Pipe deflection shall not
exceed the manufacturer’s recommendations, unless precast or cast -in-place bends are
specifically designed for deflection. All curved alignments must be approved by the County
Stormwater Engineer prior to design commencement.
J. Stormwater pipe flow should be calculated using the Manning’s equation, either directly or
through use of a model that implements the Manning’s equation. The County will accept
commonly used computers models or methodologies capability of analyzing the hydraulic
capacity of proposed storm drain pipelines and systems.
K. All pipes must have a slope at or greater than 0.25%, or the minimum mean flow velocity in
a stormwater pipe flowing full shall be 2.0 feet per second. Flow velocities must be sufficient
to prevent excess deposition of solid material that could result in clogging.
L. Maximum velocities are important to prevent excessive erosions on the stormwater inverts
and outlets. The table below lists the maximum velocities allowed for each type of pipe.
Energy dissipaters are required at outfalls where the stormwater pipe flow exceeds the
maximum permissible velocity.
Maximum Velocity in Stormwater Pipes
Description Maximum Permissible Velocity
Culverts (all types) 15 ft/s
Collector Pipes 15 ft/s
Main Pipes 12 ft/s
Page 59 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 50 of 58
M. It is important to consider the energy gradient and profile of storm sewers to prevent operating
the pipes under pressure when possible. If (1) the slope and pipe sizes are chosen such that the
pipe slope is equal to or greater than the friction slope, (2) the inside top surfaces of successive
pipes are lined up at size changes, and (3) the water surface at the outlet will not rise above
the top of the outlet, then the pipes should not be operating under pressure. The slope of the
water surface at capacity will be approximately equal to the slope of the pipes . If these
conditions are not met, hydraulic and energy grade lines shall be computed.
5.4.2 Open Channels
Open channels are frequently an integral component of urban drainage system design. Open channels
may be natural channels, constructed channels, ditches, or swales.
1. Freeboard: Open channels shall be designed to convey the 10 -year storm event below its
freeboard elevation and the 25-year storm event below its bankfull elevation.
A. Channels three feet or less in depth, the freeboard shall be one half foot;
B. Channels deeper than three feet and up to five feet deep, one foot of freeboard is required; and
C. Channels deeper than five feet, freeboard shall be at least 20 percent of the total channel depth.
2. It should be confirmed that the 100 -year storm event can be conveyed without impacting the
finished floor elevations of structures . Additional design information can be found in the HEC -
22, Urban Drainage Design Manual.
3. The channel geometry may vary based on the site conditions and conveyance needs. Channel side
slopes shall be stable, with a slope no more steep than 2:1 (H:V). For channels with bottom width
greater than ten (10) feet, the bottom cross-slope shall be no less than 12:1 (H:V).
4. Channel linings may be natural materials, imported materials, vegetated, or manufactured . The
cost, site requirements, design criteria (peak flow, maximum velocity, and shear stress), and
existing conditions may dictate the chan nel lining type . Channel linings shall emulate natural
conditions whenever possible.
5. Channel velocity shall be maintained as non-erosive during the design storm event for the channel
material type. Peak flows expected during the design storm event shall be permissible for the
channel lining type. For channels with manufactured channel linings, the velocity limits shall be
established by the manufacturer.
6. If the channel is to be maintained by the County, the corridor must be within a dedicated easement
sized according to Section 4. 8. If the channel is not to be maintained by the County, the
maintenance of the channel shall be included in the BMP Maintenance Agreement (Appendix H).
5.4.3 Outlet Protection
1. The purpose of outlet protection is to dissipate the energy of concentration stormwater flow
through conveyance systems thereby reducing erosion and scouring at the outlets and lowering
the potential for downstream erosion . Outlet protection can be turf reinforcement mats, stone or
riprap, concrete aprons, paved se ctions, or other structural measures. This applies to the
Page 60 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 51 of 58
immediate outlet area or reach below the outlet and does not apply to continuous lining of
channels or streams. Outlet protection should be placed at all stormwater conveyance systems
outlets.
2. Appropriate velocity dissipation devices and/or erosion prevention BMPs must be placed at
culvert discharge locations and along the length of any outfall channel to provide non -erosive
flow from the culvert to a surface water so that the natural physical and biological characteristics
and functions are maintained and protected. The protection shall have no slope along its length
and shall have a straight alignment.
3. Provide calculations or procedures utilized to select the proper outlet protection and protect ion
dimensions. Outlet protection design criteria can be found in the SC DES Stormwater
Management BMP Handbook. For additional design information or for areas with excessive flow,
use the design criteria in HEC -14, Hydraulic Design of Energy Dissipater s for Culverts and
Channels (Federal Highway Administration (FHWA), 2006).
5.5 Culverts And Bridges
1. Culverts and bridges must be designed to safely pass the peak flow under roadways, railroads, or
other features that cross open channel conveyance systems . It is important that culverts and
bridges do not cause excessive backwater or velocities. These features have larger design storm
requirements than the stormwater conveyance system:
A. Residential and collector roadways cross-drain culverts: must convey the 25-year storm event.
B. Arterial road culverts: must convey the 50-year storm event.
C. All culverts and bridges must pass the 100 -year storm event without damage to physical
facilities (i.e. finished floor elevations of buildings, roadway embankments and subgrades).
2. Inlet and outlet Discharge velocities shall not impact channel stabilities . A scour analyses shall
be performed for critical culvert and bridge structures if requested by the County Stormwater
Engineer, municipality, state, or federal jurisdictions. At a minimum, all inlet and outlet locations
impacted by flow velocities near structures shall include channel protection where erosive flow
velocities occur. The mean minimum velocity through a culvert flowing full shall be 2.0 feet per
second, the lower limit of scouring velocity, to prevent the settling of materials.
3. Allowable culvert material shall be according to Section 5.4.1 of this Manual.
4. Culvert length shall be adequate to accommodate required headwalls, sloping of embankments,
end wall treatments, and any other applicable inlet/outlet protections. The slope of the culvert
shall conform to the existing naturalized channel slope and shall not impede flows along the
bottom of the open channel. For culverts the minimum geometry for circular culverts is 15 inches
in diameter. Bridges shall be designed to not impact channel flow characteristics.
5. Headwalls shall be used for any inlets at pipes larger than 24 inches diameter. These inlets shall
not impact embankment stability or erosion. Wingwalls, inlet apr ons, and other structural means
may be used to provide additional inlet protection.
Page 61 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 52 of 58
6. If the exit velocity is high and/or the receiving channel conditions are pro ne to erosion and
destabilization of the channel, outfall energy dissipaters for culverts or channel armor shall be
required. Materials may include properly sized stone riprap, stilling basins, hardened control
devices, or natural structures, designed in accordance with FHWA HEC-14, Hydraulic Design of
Energy Dissipaters for Culverts and Channels, 1983.
7. The culvert or bridge must be in compliance with the National Flood Insurance Program. It is
necessary to consider the 100-year storm event at the local identified special flood hazard areas.
8. The County Stormwater Manager may require the use of a computer model to accurately evaluate
the complex hydraulic conditions of culverts and bridges to ensure compliance with this manual.
Page 62 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 53 of 58
SECTION 6 INSPECTIONS
6.1 Permittee/Owner Construction Inspections
Inspections performed by the Permittee/Owner shall be conducted by qualified personnel. “Qualified
personnel” means a person knowledgeable in the principles and practice of erosion and sediment
control who possesses the skills to assess conditions at the construction site that could impact storm
water quality and to assess the effectiveness of any sediment and erosion control measures selected
to control the quality of storm water discharges from the construction activity . This person must be
either the preparer of the C -SWPPP or an individual who is under the direct supervision of the
preparer of the approved C-SWPPP and who meets the requirements in this paragraph or an individual
who has been certified through the Certified Erosion Prevention and Sediment Control Inspector
(CEPSCI) program that has been approved by SCDES. Inspections may also be conducted by a person
with a registration equivalent to the registration of the preparer of the C -SWPPP and who meets the
qualifications of this paragraph or an individual who is under the direct supervision of the person with
an equivalent registration and who meets the requirements in this paragraph.
After construction begins, inspections shall be conducted at least once every calendar week and within
24-hours after each rainfall event that produces one (1) inch or more of rainfall. Inspection frequencies
for portions of the construction site that have reached temporary or final stabilization may be reduced
to at least once every month, as long as the stabilization is maintained and there is no additional
disturbance in these areas. Once a definable area has reached final stabilization, mark on the OS -
SWPPP and no further inspection requirements apply to that portion of the Site. Inspection of
common BMPs, such as sediment basins and sediment traps, may be required to resume if areas that
drain to them become disturbed during future construction. The County, on a case-by-case basis, may
require any Permittee to conduct inspections on a more frequent basis than prescribed . Examples
include, but are not limited to, Permittees who have compliance problems and Permittees with
stormwater discharges to environmentally sensitive waters. The County may require on a case -by-
case basis that the Permittee submit a monthly report summarizing the inspections at the site and any
associated maintenance activity.
Inspections shall include all areas of the site disturbed by construction activity and areas used for
storage of materials that are exposed to precipitation . Inspectors shall look for evidence of, or the
potential for, pollutant s entering the storm water conveyance system . Sedimentation and erosion
control measures identified in the C-SWPPP shall be observed to ensure proper operation. Discharge
locations shall be inspected to ascertain whether erosion control measures are effective in preventing
violations to SC’s Water Quality Standards, where accessible. Where discharge locations are
inaccessible, nearby downstream locations shall be inspected to the extent that such inspections are
practicable. Locations where vehicles enter or exit the site shall be inspected for evidence of off-site
sediment tracking.
Utility line installation, pipeline construction, and other examples of long, narrow, linear construction
activities may limit the access of inspection personnel to the areas described above. Inspection of
these areas could require that vehicles compromise temporarily or even permanently stabilized areas,
cause additional disturbance of soils, and increase the potential for erosion . In these circumstances,
controls shall be inspected on the same frequencies as other construction projects, but representative
inspections may be performed. For representative inspections, personnel shall inspect controls along
Page 63 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 54 of 58
the construction site for 0.25 mile above and below each access point whe re a roadway, undisturbed
right-of-way, or other similar feature intersects the construction site and allows access to the areas
described above. The conditions of the controls along each inspected 0.25 mile segment may be
considered as representative of t he condition of controls along that reach extending from the end of
the 0.25 mile segment to either the end of the next 0.25 mile inspected segment, or to the end of the
project, whichever occurs first. Representative inspections shall include any areas where stormwater
discharges to environmentally sensitive waters.
Permittees shall either maintain an on-site rain gauge or use data from a certified weather record (such
as a personal weather station or an airport) located within a reasonable proximity of the construction
site to record rainfall records from any significant rainfall event, 0.5 inches or greater. These recorded
rainfall amounts shall be maintained in a Rain Log located in the OS -SWPPP. Rainfall records for
the day of an inspection and any ra infall since the last inspection shall be reported on each weekly
inspection report.
For each inspection required above, an inspection report (SCDES Form D-0496) shall be completed.
At a minimum, the inspection report shall include:
1. The inspection date and duration of inspection (arrival and departure times).
2. Names, titles, and, if not previously given in an inspection report, the qualifications of personnel
making the inspection, unless those qualifications change.
3. Weather information for the peri od since the last inspection (or since commencement of
construction activity if the first inspection) including a best estimate of the beginning of each
storm event, duration of each storm event, approximate amount of rainfall for each storm event
(in inches), and whether any known discharges have occurred.
4. Weather information and a description of any discharges occurring at the time of the inspection.
5. Location(s) of discharges of sediment or other pollutants from the site.
6. Location(s) of BMPs that need maintenance.
7. Location(s) of BMPs that failed to operate as designed or proved inadequate for a particular
location.
8. Location(s) where additional BMPs are needed that did not exist at the time of inspection.
9. Corrective action required including any changes t o the OS -SWPPP necessary and
implementation dates.
10. Site name, operator name and permit number.
11. Verification that all BMPs and stormwater controls identified in the OS -SWPPP have been
installed and are operating as designed.
A record of each inspection and of any actions taken in accordance with this section shall be retained
as part of the C -SWPPP for at least three years from the date that permit coverage expires or is
terminated. The report shall be signed in accordance with §122.22 of SC Regulation 61-9.
Page 64 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 55 of 58
Inspectors employed by the Primary Permittee retain the authority to inspect, report, and document
areas of the construction site that are under direct control of the Secondary Permittee, but only when
a lack of compliance by the Secondary Permittee inhibits the Primary Permittee’s ability to maintain
compliance with the overall OS-SWPPP.
Third party inspections, by a qualified individual who is independent of the owner, may be required
at the discretion of the County Engineer at sites that have compl iance problems and at sites where
stormwater discharges to environmental sensitive waters (such as w aters classified as Outstanding
Resource Waters, Shellfish Harvesting Waters, etc.) . Inspections must be done by qualified
professionals as outlined in the SCDES’s Construction General Permit (SCR -100000). Inspection
reports shall be submitted to the County every two weeks or 30 days if the site has been temporarily
stabilized and approved by the County showing results of inspections, weather conditions, corrective
actions and other information as may be required by the County Engineer.
6.2 Construction Maintenance
Proper operation and maintenance of BMPs is critical to ensure that the effectiveness and integrity of
the BMPs as water quality controls is maxim ized. This insurance is critical in a performance -based
program of stormwater runoff controls. BMP maintenance is the responsibility of the facility owner.
All BMPs and other protective measures identified in the OS-SWPPP shall be maintained in effective
operating condition. If construction site inspections identify BMPs that are not operating effectively,
maintenance shall be performed within seven (7) calendar days, before the next inspection, or as soon
as reasonably possible, and before the next storm event whenever practicable to maintain the
continued effectiveness of the BMPs.
If periodic inspection or other information indicates that a BMP has been used inappropriately, or
incorrectly, the Permittee shall address the necessary replacement or modification required to correct
the BMP within a time frame of forty-eight (48) hours of identification. If existing BMPs need to be
modified or if additional BMPs are necessary, implementation shall be completed before the next
storm event whenever practicable. If implementation before the next storm event is impracticable, the
situation shall be documented in the OS-SWPPP and alternative BMPs shall be implemented as soon
as reasonably possible.
Remove deposited sediment from sediment traps or sedimentation basins when the design capacity
has been reduced by fifty (50) percent or the sediment has reached the clean out point on the cleanout
stake (whichever occurs first).
Remove deposited sediment collected by sediment control measure (silt fence, check dams, sediment
tubes, etc.) when the deposited sediment reaches one-third ( 1/3) the height of the above -ground
portion of these BMPs, or before it reaches a lower height based on the manufacturer's specifications.
Page 65 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 56 of 58
6.3 County Inspection
All elements of the storm drainage system must be inspected by the County during construction as a
prerequisite for acceptance by the County. It is the contractor's responsibility to ensure that the County
is notified and has the opportunity to make those inspections before the system is backfilled or
covered.
The inspections conducted by the County are for the protection of the County only. They are not
intended to certify the contractor's satisfactory discharge of his contractual obligation to the owner,
nor do they relieve the engineer-of-record from any of his responsibilities concerning certification of
the project.
County Inspectors are authorized by the County to inspect and enforce the re quirements of this
Manual and the approved C-SWPPP. The inspectors shall be:
1. Authorized to conduct inspections on behalf of the County and file reports for periodic inspections
as necessary during construction of stormwater systems to assure compliance with the approved
SWPPP.
2. Authorized to furnish the permittee or agent the results of inspection in a timely manner after the
completion of each required inspection.
3. Authorized to issue a Correction Notice to the permittee or agent when any portion of the work
does not comply with the approved plans.
4. Authorized to issue a Notice of Violation (N OV) to the permittee or agent when any portion of
the work does not comply with the approved plans.
5. Authorized to Issue a Stop Work Order as the result of unsafe conditions, working without a
permit, unsatisfactory work, progress, or other non-compliance.
6. Authorized to perform a final inspection upon the completion of the storm water system to
determine if the completed work is constructed in accordance with the approved storm water
design plan, approved “As -built” plan , in accordance with the County’s As -Built Survey
Requirements (Appendix E), certified by the permittee’s registered professional engineer.
Any enforcement actions or corrective actions will be issued to the permittee as listed on the approved
NOI and County Land Disturbance Application. If the site has an Individual NOI, the owner listed on
the Individual NOI shall be the responsible party.
Page 66 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 57 of 58
SECTION 7 PERMANENT BMP MAINTENANCE
The land owner or person in possession or control of the land shall maintain all stormwater BMPs
and devices and all open space areas required by the approved SWPPP unless those measures, devices,
and open space areas are accepted for maintenance by another agency.
For all stormwater BMPs, a signed Maintenance Agreement and approved attached Maintenance Plan
is required in accordance with Section 4.3.5.
A clear statement of defined maintenance responsibility shall be established during the permit
application review and approval process. This statement ensures that structural BMPs will be
maintained post-construction. If they are not being properly maintained, the County has the authority
to require maintenance to be done at the expense of the person responsible for maintenance as listed
on the Maintenance Agreement.
The maintenance agreement shall be recorded with the County Register of Deeds prior to the
recording of any new lot served by the stormwater BMP or prior to the issuance of any development
permit for any existing lot except for improvements. The maintenance covenant shall be binding on
all subsequent owners of land served by the stormwater BMP. A recorded copy of the maintenance
covenant shall be provided to the County prior to the issuance of a County Land Disturbance Permit.
Where a pipe or other man-made conveyance is used to transport runoff to an off-site facility and that
conveyance passes through a public street ROW or other publicly owned property, an encroachment
and maintenance agreement shall be approved by the County prior to the issuance of permits.
7.1 County Permanent Structure Maintenance Inspections
The purpose of County maintenance inspections is to ensure that permanent stormwater management
BMP structures are working properly and remain functional.
No later than 30 days after completion of construction of any project that utilizes BMPs to meet the
site performance standards, the County will conduct a post-construction inspection to verify that the
BMP has been installed per approved plans.
The operators/owners must notify the County of their completion of active construction so the pos t-
construction inspection may be conducted by the County.
The County has the authority to inspect any BMP at least once a year as needed.
1. The County will attempt to contact the owner before a maintenance inspection and will notify the
owner after an inspection. The County shall conduct maintenance inspections at reasonable times.
2. If the owner cannot be contacted, the inspection shall be performed and a report shall be sent to
the owner.
3. Upon refusal by any property owner to permit an inspector to enter or continue an inspection, the
inspector shall terminate the inspection or confine the inspection to areas where no objection is
Page 67 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Page 58 of 58
raised. The inspector shall immediately report the refusal and grounds to the County. The County
shall promptly seek the appropriate compulsory process.
4. In the event where it is believed that discharges from the property may cause imminent and
substantial threat to human health or the environment, the inspection may take place at any time
without notice.
5. Inspection Reports shall be maintained in a permanent file located in the Stormwater office.
6. A Correction Order and/or Notice of Violation shall be issued for any required maintenance
needed.
7. After a notice to comply is given in writing, a specified period of time shall be allocated for the
owner/permittee to begin the required maintenance activities.
If an imminent hazard exists and the owner fails to comply with the required maintenance activities,
the County shall employ the necessary labor and materials to perform the required w ork as
expeditiously as possible. The owner shall be assessed the costs of the maintenance labor and
materials. The costs shall become a lien on the property and shall be collected in the same manner as
County taxes.
7.2 Owner Maintenance Inspections
Inspections of permanent BMPs and other stormwater controls are to be conducted by the Owner or
person in possession or control of the land in accordance with the maintenance schedule and plan
depending on the specific BMP. This will be done to ensure that routine and remedial maintenance is
being performed and that the BMPs are operating properly. The inspection includes a certification by
a South Carolina registered professional engineer, registered landscape architect, or registered land
surveyor, or other quali fied individual that appropriate maintenance is being performed. The
following certification is to be made with accompanying stamp or seal, signature and date.
"I certify that the BMPs, stormwater management facilities, and open space areas referenced in this
document have been maintained in conformance with the approved stormwater management plan
and maintenance manual. This certification is made based on personal observation or on the
observation by someone under my direct supervision of the site and review of maintenance records."
These inspections should be provided to the County at their request to show compliance with the
approved BMP Maintenance Agreement and Maintenance Plan.
Page 68 of 229
Appendix A
Georgetown County Stormwater Submittal Checklist
Page 69 of 229
Appendix A: Georgetown County Stormwater Submittal
Checklist
This Georgetown County Stormwater Submittal Checklist must be filled out and submitted to the
County as part of the C-SWPPP and application for a Land Disturbance Permit. Please include
the location of each item within the application package to acknowledge that this item is
included in your submittal in the appropriate location and in compliance with the Georgetown
County Stormwater Design Manual. If you do not feel that a component is not necessary for
your permit application, please
note “N/A” in the location and attach a sheet to this checklist
explaining to Georgetown County the reasoning.
NOTE: This checklist is not all-inclusive, and the applicant is responsible for ensuring compliance with
all federal, state, and County requirements.
C-SWPPP Submittal Components Location
1. Completed Stormwater Pre-Submittal Meeting
2. Completed Stormwater Submittal Checklist
4. Completed and Signed Georgetown County Land Disturbance Permit
5. Check with proper review fees Hard Copy Required
6. SWPPP Report
7. Stormwater Management Report
8. Drainage Basin Maps (Pre and Post Development)
9. Identification of Tailwater Conditions
10. Summary Tables (peak runoff and pond stage)
11. Downstream Analysis
12. Water Quality Calculations
13. ACOE Wetlands Jurisdictional Determination (Preliminary or
Approved, as applicable) OR third-party wetland determination, and
permit (if applicable)
14. Geotechnical Report, to include SHWT determination
15. Complete set of plans
16. Georgetown County Stormwater Management BMP Maintenance
Agreement Original Hard Copy Required
17. BMP Maintenance Plan (Attachment A to Maintenance Agreement)
18. OCRM CZC approval
19. List of all contiguous property owners and addresses with stamped/
addressed envelopes. Do not include a return address. Hard Copy Required
20. SCDOT encroachment permit, if applicable
21. Response to Comments letter (for all submittals after the first submittal)
3. Copy of the DHEC NOI
Page 70 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Appendix B
Georgetown County Fee Schedule
Page 71 of 229
/0/1/2 /3 /4 /1 /5 /2 /6 /7 /i255 /9 /2 /10 /7 /5 /11 /i255
/12/1/13 /14 /3 /5/15/1/7 /5 /i255 /2 /16 /i255 /17 /10 /18 /19 /20 /21 /i255 /22 /1 /3 /23 /20 /21 /1 /24/i255
/22 /5 /2 /3/15/6 /14/5 /1 /3 /i255/12/20/23 /20 /24 /20 /2 /7/i255
/25 /26 /26 /27 /28 /29 /30 /31 /28 /32 /i255 /34 /32 /29 /35 /32 /36 /37 /38 /31 /39 /i255 /40 /i255/41/32/29 /42 /43 /27 /36 /44 /45 /i255
/i255
/i255
/i255
/17 /10 /18 /19 /20 /21 /i255 /22 /1 /3 /23 /20 /21 /1 /24 /i255/12/1/13 /14 /3 /5/15/1/7 /5 /i255
/48 /49 /50 /i255 /51 /52 /53 /54 /55 /54 /56 /i255 /51 /57 /53 /54 /54 /57 /i255 /i255/58/i255 /i255/59/54/60 /53 /61 /54 /57 /60/62/56/63 /i255 /51/64/i255/i255 /65 /66 /67 /67 /49 /i255
/68 /69 /60 /56 /54 /70 /i255 /50 /67 /71 /72 /73 /67 /73 /72 /71 /71 /65 /73 /i255 /i255/58/i255 /i255 /74 /75 /76 /70 /i255 /50 /67 /71 /72 /73 /67 /73 /72 /71 /67 /50 /71 /i255 /i255/58 /i255 /i255/54/77/75/78 /79 /70 /i255 /53 /52 /80 /81 /56 /56 /82 /54 /83/61 /57 /52 /60 /81 /56 /57 /82 /84 /60 /53 /61 /i255
/i255
/i255
/86 /87 /88 /i255 /89/90 /91 /92 /i255 /90 /93 /i255 /94 /88 /95 /93 /90 /95/96/97/98 /99 /i255 /100 /92 /90 /95/96/101/102/92 /88 /95 /i255 /103 /104 /102 /98 /i255 /95 /88 /105 /97 /88 /101 /91 /i255 /102 /98 /106 /i255 /90 /93 /i255 /102 /106/96/97/98 /97 /91 /92 /88 /95 /97 /98 /99 /i255 /102 /94 /94 /104 /97 /89 /102 /92 /97 /90 /98 /91 /i255 /93 /90 /95 /i255 /107 /90 /108 /98 /92 /109 /i255 /91 /92 /90 /95/96/101/102 /92 /88 /95 /i255 /94 /88 /95/96/97/92 /91 /i255 /105 /102 /95 /109 /i255 /110 /102 /91 /88 /106/i255 /90 /98 /i255
/92 /87 /88 /i255 /91 /97/111 /88 /i255 /102 /98 /106 /i255 /89 /90/96/94/104 /88 /112 /97 /92 /109 /i255 /90 /93 /i255 /92 /87 /88 /i255 /106 /88 /105 /88 /104 /90 /94/96/88/98 /92 /113 /i255 /86 /87 /88 /i255 /93 /88 /88 /i255 /91 /89 /87 /88 /106 /108 /104 /88 /i255 /94 /95 /88 /91 /88 /98 /92 /88 /106 /i255 /110 /88 /104 /90 /101 /i255 /97 /91 /i255 /88 /91 /92 /102 /110 /104 /97 /91 /87 /88 /106 /i255 /92 /90 /i255 /102 /91 /91 /97 /91 /92 /i255 /97 /98 /i255 /93 /97 /98 /102 /98 /89 /97 /98 /99 /i255 /92 /87 /88 /i255 /107 /90 /108 /98 /92 /109/i255
/100 /92 /90 /95 /96/101 /102 /92 /88 /95 /i255/114/102/98 /102 /99 /88/96/88/98 /92 /i255 /103 /95 /90 /99 /95 /102/96/113/i255 /86 /87 /88 /95 /88 /93 /90 /95 /88 /115 /i255 /102 /91 /i255 /90 /93 /i255 /116 /108 /104 /109 /i255 /117 /115 /i255 /118 /119 /118 /120 /115 /i255 /92 /87 /88 /i255 /93 /90 /104 /104 /90 /101 /97 /98 /99 /i255 /93 /88 /88 /i255 /91 /89 /87 /88 /106 /108 /104 /88 /i255 /91 /87 /90 /108 /104 /106 /i255 /110 /88 /i255 /97/96/94/104 /88/96/88/98 /92 /88 /106 /121 /i255
/122 /123 /124 /125 /i255 /127 /128 /i255 /129 /125 /130 /125 /131 /127 /124/132/125/133 /134 /i255 /127 /135 /i255
/136 /137 /134 /138 /130 /138 /134 /123 /i255 /i255/139 /138 /140 /125 /i255 /127 /128 /i255 /129 /125 /130 /125 /131 /127 /124/132/125/133 /134 /i255 /i255/139 /134 /141 /133 /142 /141 /135 /142 /i255 /143 /125 /125 /i255/136 /142 /142 /138 /134 /138 /127 /133 /141 /131 /i255 /143 /125 /125 /i255/i255
/144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255
/100 /97 /98 /99 /104 /88 /i255 /147 /102/96/97/104 /109 /i255
/i255 /148 /112 /88/96/94/92 /145 /i255 /149 /150 /90 /i255
/144 /88 /105 /97 /88 /101 /115 /i255 /150 /90 /i255 /147 /88 /88 /151 /i255
/i255
/144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255
/100 /97 /98 /99 /104 /88 /i255 /147 /102/96/97/104 /109 /i255 /117 /i255 /152 /89 /95 /88 /i255 /90 /95 /i255 /153 /95 /88 /102 /92 /88 /95 /i255 /i255
/154 /117 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255
/155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255
/96/102/112 /i255
/154 /117 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255
/154 /118 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /118 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255
/147 /102/96/97/104 /109 /i255 /100 /108 /110 /106 /97 /105 /97 /91 /97 /90 /98 /i255
/119 /113 /120 /i255 /102 /89 /95 /88 /91 /i255 /102 /98 /106 /i255 /101 /97 /92 /87 /97 /98 /i255 /119 /113 /120 /i255/96/97/104 /88 /i255 /90 /93 /i255 /144 /88 /89 /88 /97 /105 /97 /98 /99 /i255
/160/102/92 /88 /95 /i255 /161 /90 /106 /109 /i255 /90 /95 /i255 /117 /i255 /102 /89 /95 /88 /i255 /102 /98 /106 /i255 /108 /94 /113 /i255
/154 /117 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255
/155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255
/96/102/112 /i255
/154 /117 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255
/154 /118 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /118 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /145 /146 /98 /106 /97 /105 /97 /106 /108 /102 /104 /i255
/114/108/104 /92 /97 /145 /147 /102/96/97/104 /109 /i255 /i255
/119 /113 /120 /i255 /102 /89 /95 /88 /91 /i255 /102 /98 /106 /i255 /101 /97 /92 /87 /97 /98 /i255 /119 /113 /120 /i255/96/97/104 /88 /i255 /90 /93 /i255 /144 /88 /89 /88 /97 /105 /97 /98 /99 /i255
/160/102/92 /88 /95 /i255 /161 /90 /106 /109 /i255 /90 /95 /i255 /117 /i255 /102 /89 /95 /88 /i255 /102 /98 /106 /i255 /108 /94 /113 /i255
/154 /118 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255
/155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255
/96/102/112 /i255
/154 /118 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/150 /90 /98 /145 /144 /88 /91 /97 /106 /88 /98 /92 /97 /102 /104 /i255 /i255/119 /113 /120 /i255 /102 /89 /95 /88 /91 /i255 /102 /98 /106 /i255 /101 /97 /92 /87 /97 /98 /i255 /119 /113 /120 /i255/96/97/104 /88 /i255 /90 /93 /i255 /144 /88 /89 /88 /97 /105 /97 /98 /99 /i255
/160/102/92 /88 /95 /i255 /161 /90 /106 /109 /i255 /90 /95 /i255 /117 /i255 /102 /89 /95 /88 /i255 /102 /98 /106 /i255 /108 /94 /113 /i255
/154 /118 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255
/155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255
/96/102/112 /i255
/154 /118 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/114/102/162 /90 /95 /i255/114/90/106 /97 /93 /97 /89 /102 /92 /97 /90 /98 /i255 /90 /93 /i255
/152 /94 /94 /95 /90 /105 /88 /106 /i255 /103 /104 /102 /98 /i255/152 /98 /109 /i255/i255
/154 /157 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255
/155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255
/96/102/112 /i255
/154 /157 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255
/154 /158 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /158 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/114/97/98 /90 /95 /i255/114/90/106 /97 /93 /97 /89 /102 /92 /97 /90 /98 /i255 /90 /93 /i255
/152 /94 /94 /95 /90 /105 /88 /106 /i255 /103 /104 /102 /98 /i255/152 /98 /109 /i255/i255
/154 /118 /119 /119 /i255 /94 /88 /95 /i255/152/89/95 /88 /i255
/155 /97 /91 /92 /95 /97 /110 /108 /92 /88 /106 /i255 /156 /154 /118 /115 /119 /119 /119 /i255
/96/102/112 /i255
/154 /118 /120 /119 /i255 /i255 /157/95 /106/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /119 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /120 /119 /i255 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/152/91/145 /161 /108 /97 /104 /92 /i255 /103 /104 /102 /98 /i255 /144 /88 /105 /97 /88/101/i255 /152 /98 /109 /i255 /154 /119 /i255 /93 /90 /95 /i255 /97 /98 /97 /92 /97 /102 /104 /i255
/91 /108 /110/96/97/92 /92 /102 /104 /i255
/154 /117 /120 /119 /i255 /118/98 /106 /i255/163/i255/157/95 /106 /i255/144 /88 /105 /97 /88/101/i255
/154 /118 /120 /119 /i255 /i255 /158/92 /87/i255 /144 /88 /105 /97 /88 /101/i255
/154 /157 /119 /119 /i255 /120/92 /87/159 /i255 /144 /88 /105 /97 /88 /101/i255
/144 /88 /105 /97 /88 /101 /i255 /90 /93 /i255 /152 /94 /94 /104 /97 /89 /102 /92 /97 /90 /98 /i255 /93 /90 /95 /i255
/164 /102 /95 /97 /102 /98 /89 /88 /i255/152 /98 /109/i255/154 /157 /119 /119 /i255/154 /157 /119 /119 /i255 /94 /88 /95 /i255 /93 /102 /89 /92 /i255 /93 /97 /98 /106 /97 /98/99 /i255
/96/88/88 /92 /97 /98 /99 /i255/i255
/114/97/98 /90 /95 /i255 /164 /97 /90 /104 /102 /92 /97 /90 /98 /i255/152 /98 /109/i255/154 /118 /120 /119 /156 /88 /102 /89 /87 /156 /106 /102 /109/i255/i255
/114/102/162 /90 /95 /i255 /164 /97 /90 /104 /102 /92 /97 /90 /98 /i255/152 /98 /109/i255/154 /117 /119 /119 /119 /156 /88 /102 /89 /87 /156 /106 /102 /109/i255/i255
/146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255 /106 /108 /88 /i255 /110 /88 /93 /90 /95 /88 /i255
/94 /95 /88 /145 /89 /90 /98 /91 /92 /95 /108 /89 /92 /97 /90 /98 /i255/96/88/88 /92 /97 /98 /99 /i255/119 /113 /120 /145 /120 /113 /119 /i255 /102 /89 /95 /88 /91/i255/154 /117 /119 /119 /113 /119 /119 /i255 /149 /147 /104 /102 /92 /i255 /93 /88 /88 /151 /i255/i255
/146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255 /106 /108 /88 /i255 /110 /88 /93 /90 /95 /88 /i255
/94 /95 /88 /145 /89 /90 /98 /91 /92 /95 /108 /89 /92 /97 /90 /98 /i255/96/88/88 /92 /97 /98 /99 /i255/120 /113 /119 /117 /i255 /145 /117 /119 /113 /119 /i255 /102 /89 /95 /88 /91 /i255/i255
/154 /118 /119 /119 /113 /119 /119 /i255 /149 /147 /104 /102 /92 /i255 /93 /88 /88 /151/i255 /i255
/146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255 /106 /108 /88 /i255 /110 /88 /93 /90 /95 /88 /i255
/94 /95 /88 /145 /89 /90 /98 /91 /92 /95 /108 /89 /92 /97 /90 /98 /i255/96/88/88 /92 /97 /98 /99 /i255/117 /119 /113 /119 /117 /i255 /159 /i255 /102 /89 /95 /88 /91 /i255/i255
/154 /158 /119 /119 /113 /119 /119 /i255 /149 /147 /104 /102 /92 /i255 /93 /88 /88 /151/i255 /i255
/100 /92 /90 /94 /i255/160/90/95 /165 /i255 /166 /95 /106 /88 /95 /i255 /144 /88 /145
/146 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255 /147 /88 /88 /i255/152 /98 /109 /i255 /154 /117 /119 /119 /i255 /94 /88 /95 /i255 /95 /88 /145
/97 /98 /91 /94 /88 /89 /92 /97 /90 /98 /i255/i255
/150 /90 /92 /88 /121/i255 /144 /90 /108 /98 /106 /i255 /155 /97 /91 /92 /108 /95 /110 /88 /106 /i255 /152 /95 /88 /102 /i255 /92 /90 /i255 /150 /88 /102 /95 /88 /91 /92 /i255 /86 /88 /98 /92 /87 /i255
Page 72 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Appendix C
Georgetown County Close-Out Application Form
Page 73 of 229
/0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □
□/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□
/31 /32 /33 /34 □ /35 □ /36 /37 □ /38 □
/39 /40 /41 /42 /43 /40 /44 /41 /45 /46 □ /48 /41 /49 /46 /44 /50 □
/51 /40 /52 /53 /42 /44 /54/40 /46 /44 □ /41 /55 □ /56 /49 /57 /58 /59 /60 □ /61 /40 /42 /62 /59 /60 /40 /63 □
□
□
□
/65 /66 /67 /68 /69 /70 /67 /71 /72 □ /74 /75 /75 /66 /76 /65 /74 /72 /76 /67 /77 □ /78 /67 /79 /80□
/81 /82 /83 /84 □ /37 /36 /85 /86 □ /86 /87 /84 /88 □ /89 /34 □ /37 /83 /90 /90 /34 /91 □ /36 /87 /88 □ /37 /36 /85 □ /92 /34 /36 /85 /33 /34 /88 /36 /93 /94 □ /95 /36 /87 /94 /88 /96 □/97 /32 /94 /91 □ /98 /83 /84 /88 /87 /85 /89 /32 /94 /99 /34 □ /100 /99 /88 /83 /101 /83 /88 /96 □ /31 /85 /36 /102 /34 /99 /88 /84 □
/85 /34 /103 /87 /83 /85 /83 /94 /33 □ /32 □ /104 /88 /36 /85 /86 /93 /32 /88 /34 /85 □ /95 /36 /94 /84 /88 /85 /87 /99 /88 /83 /36 /94 □ /100 /105 /105 /85 /36 /101 /32 /90 □ /87 /105 /36 /94 □ /99/36 /86 /105 /90 /34 /88 /83 /36 /94 □ /36 /37 □ /99 /36 /94 /84 /88 /85 /87 /99 /88 /83 /36 /94 /106 □
□
/107 /32 /86 /34 □ /36 /37 □ /31 /85 /36 /102 /34 /99 /88 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/104 /88 /36 /85 /86 /93 /32 /88 /34 /85 □ /31 /90 /32 /94 □ /110 /34 /101 /83 /34 /93 □ /100 /105 /105 /85 /36 /101 /32 /90 □ /98 /32 /88 /34 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/107 /31 /98 /111 /104 □ /31 /34 /85 /86 /83 /88 □ /95 /36 /101 /34 /85 /32 /33 /34 □ /107 /87 /86 /89 /34 /85 □ /112 /83 /37 □ /32 /105 /105 /90 /83 /99 /32 /89 /90 /34 /113 /108 □ /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/75 /79 /67 /75 /69 /79 /72 /114 □ /76 /77 /78 /67 /79 /80/74 /72 /76 /67 /77 □
/100 /106 □ /116 /93 /94 /34 /85 /117 /98 /34 /101 /34 /90 /36 /105 /34 /85 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/100 /91 /91 /85 /34 /84 /84 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/31 /82 /36 /94 /34 □ /112 /98 /32 /96 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /95 /34 /90 /90 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /121 /32 /122 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/111 /123 /86 /32 /83 /90 □ /100 /91 /91 /85 /34 /84 /84 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/124 /106 □ /31 /85 /36 /105 /34 /85 /88 /96 □ /100 /91 /91 /85 /34 /84 /84 □ /112 □
□ /95 /82 /34 /99 /125 □ /89 /36 /122 □ /83 /37 □ /84 /32 /86 /34 □ /32 /84 □ /32 /89 /36 /101 /34 /113 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/31 /32 /85 /99 /34 /90 /117 /81 /126 /104 □ /127 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/95 /106 □ /31 /85 /34 /101 /83 /36 /87 /84 □ /116 /93 /94 /34 /85 □ /107 /32 /86 /34 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/100 /91 /91 /85 /34 /84 /84 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/31 /82 /36 /94 /34 □ /112 /98 /32 /96 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /95 /34 /90 /90 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /121 /32 /122 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/111 /123 /86 /32 /83 /90 □ /100 /91 /91 /85 /34 /84 /84 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/98 /106 □ /111 /94 /33 /83 /94 /34 /34 /85 /118 □ /81 /34 /99 /82 /94 /83 /99 /32 /90 □ /110 /34 /105 /85 /34 /84 /34 /94 /88 /32 /88 /83 /101 /34 □ /36 /85 □ /121 /83 /85 /86 /108 □ /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/100 /91 /91 /85 /34 /84 /84 /108 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/95 /83 /88 /96 /118 □ /104 /88 /32 /88 /34 □ /119 □ /120 /83 /105 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/31 /82 /36 /94 /34 □ /112 /98 /32 /96 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /95 /34 /90 /90 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □ /112 /121 /32 /122 /113 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/111 /123 /86 /32 /83 /90 □ /100 /91 /91 /85 /34 /84 /84 /108 □ /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109/109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 /109 □
/68 /128 /129 /130 /131 /132 /133 /128 /134 /130 □ /135 /136 /137 /136 /138 /136 /129 /139□
/140 /9 /141 □ /142 /12 /28 /13 /21 /29 □ /142 /12 /28 /22 /21 /11 /12 /28 /20 /8 □
/143 /5 /144 □ /145 /27 /22 /8 /146 /8 /13 □ /145 /21 /22 /8 /8 /21 □
/147 /8 /12 /22 /26 /8 /21 /12 /24 /13 /148 □ /145 /142 □ /5 /144 /1 /1 /15 □
Page 74 of 229
/0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □
□/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□
/31 /32 /33 /34 □ /35 □ /36 /37 □ /35 □
/38 /39 /40 /41 /42 /43 /40 /44 /45 □ /47 /48 /48 /39 /49 /38 /47 /45 /49 /40 /50 □ /51 /40 /52 /53□
/54 /55 /56 /57 □ /37 /36 /58 /59 □ /59 /60 /57 /61 □ /62 /34 □ /37 /56 /63 /63 /34 /64 □ /36 /60 /61 □ /37 /36 /58 □ /65 /34 /36 /58 /33 /34 /61 /36 /66 /67 □ /68 /36 /60 /67 /61 /69 □/70 /32 /67 /64 □ /71 /56 /57 /61 /60 /58 /62 /32 /67 /72 /34 □ /73 /72 /61 /56 /74 /56 /61 /69 □ /31 /58 /36 /75 /34 /72 /61 /57 □
/58 /34 /76 /60 /56 /58 /56 /67 /33 □ /32 □ /77 /61 /36 /58 /59 /66 /32 /61 /34 /58 □ /68 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 □ /73 /78 /78 /58 /36 /74 /32 /63 □ /60 /78 /36 /67 □ /72/36 /59 /78 /63 /34 /61 /56 /36 /67 □ /36 /37 □ /72 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 /79 □
□
/38 /39 /40 /41 /42 /40 /44 /45 □ /49 /50 /51 /40 /52 /53/47 /45 /49 /40 /50 □
/73 /79 □ /71 /32 /61 /34 □ /68 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 □ /68 /36 /59 /78 /63 /34 /61 /34 /64 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □
/83 /79 □ /84 /57 □ /61 /55 /34 □ /34 /67 /61 /56 /58 /34 □ /57 /56 /61 /34 □ /57 /60 /37 /37 /56 /72 /56 /34 /67 /61 /63 /69 □ /57 /61 /32 /62 /56 /63 /56 /85 /34 /64 /86 □ □ □ □ □□ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □
/68 /79 □ /73 /58 /34 □ /32 /63 /63 □ /77 /61 /36 /58 /59 /66 /32 /61 /34 /58 □ /91 /32 /72 /56 /63 /56 /61 /56 /34 /57 □ /66 /36 /58 /92 /56 /67 /33 □ /78 /58 /36 /78 /34 /58 /63 /69 /86 □□ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □
/71 /79 □ /84 /57 □ /61 /55 /34 □ /36 /78 /34 /58 /32 /61 /56 /67 /33 □ /93 /32 /56 /67 /61 /34 /67 /32 /67 /72 /34 □ /73 /33 /58 /34 /34 /59 /34 /67 /61 □ /36 /37 □ /77 /61 /36 /58 /59 /66/32 /61 /34 /58 □ /91 /32 /72 /56 /63 /56 /61 /56 /34 /57 □ /58 /34 /72 /36 /58 /64 /34 /64 □ /66 /56 /61 /55 □ /61 /55 /34 □ /65 /34 /36 /58 /33 /34 /61 /36 /66 /67 □ /68 /36 /60 /67 /61 /69□
/94 /34 /33 /56 /57 /61 /34 /58 □ /36 /37 □ /71 /34 /34 /64 /57 □ /90 /37 /37 /56 /72 /34 /86 □ □ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □
/88 /79 □ /84 /37 □ /57 /36 /95 □ /56 /67 /64 /56 /72 /32 /61 /34 □ /61 /55 /34 □ /94 /34 /72 /36 /58 /64 /34 /64 □ /71 /34 /34 /64 □ /83 /36 /36 /92 □ /96 □ /31 /32 /33 /34 /81 □ /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □
/91 /79 □ /73 /58 /34 □ /61 /55 /34 /58 /34 □ /32 □ /31 /71 /91 □ /32 /67 /64 □ /71 /97/65 □ /32 /57 /98 /62 /60 /56 /63 /61 □ /36 /37 □ /61 /55 /34 □ /57 /56 /61 /34 /99 /57 □ /77/61 /36 /58 /59 /66 /32 /61 /34 /58 □ /93 /32 /67 /32 /33 /34 /59 /34 /67 /61 □ /77 /69 /57 /61 /34 /59 □
/32 /61 /61 /32 /72 /55 /34 /64 □ /61 /36 □ /61 /55 /56 /57 □ /37 /36 /58 /59 /86 □ □ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □
/65 /79 □ /84 /57 □ /61 /55 /34 □ /32 /57 /98 /62 /60 /56 /63 /61 □ /56 /67 □ /57 /61 /32 /61 /34 □ /78 /63 /32 /67 /34 □ /72 /36 /36 /58 /64 /56 /67 /32 /61 /34 /57 /95 □ /89 /73 /71 □/100 /101 □ /56 /67 /61 /34 /58 /67 /32 /61 /56 /36 /67 /32 /63 □ /37 /34 /34 /61 /86 □ □ □ □ □ □ □ □ □ /87 /88 /77 □ □ □ □ □ □ □ □ □ /89 /90 □
□
/47 /48 /48 /39 /49 /38 /47 /50 /45 /102 /41 □ /38 /42 /52 /45 /49 /51 /49 /38 /47 /45 /49 /40 /50 □
/84 □ /55 /34 /58 /34 /62 /69 □ /72 /34 /58 /61 /56 /37 /69 □ /61 /55 /32 /61 □ /32 /63 /63 □ /72 /36 /67 /57 /61 /58 /60 /72 /61 /56 /36 /67 /95 □ /64 /34 /74 /34 /63 /36 /78 /59 /34 /67 /61/95 □ /32 /67 /64 /103 /36 /58 □ /58 /34 /98 /64 /34 /74 /34 /63 /36 /78 /59 /34 /67 /61 □ /55 /32 /57 □ /62 /34 /34 /67 □ /72 /36 /59 /78 /63 /34 /61 /34 /64 □ /56 /67 □ /32 /72 /72 /36 /58/64 /32 /67 /72 /34 □
/66 /56 /61 /55 □ /61 /55 /34 □ /68 /36 /60 /67 /61 /69 □ /58 /34 /76 /60 /56 /58 /34 /59 /34 /67 /61 /57 □ /32 /67 /64 □ /61 /55 /34 □ /68 /36 /60 /67 /61 /69 □ /32 /78 /78 /58 /36 /74 /34/64 □ /78 /58 /36 /75 /34 /72 /61 □ /32 /78 /78 /63 /56 /72 /32 /61 /56 /36 /67 □ /32 /67 /64 □ /32 /63 /63 □ /56 /67 /37 /36 /58 /59 /32 /61 /56 /36 /67 □ /56 /57 □ /61 /58 /60 /61 /55 /37/60 /63 □ /61 /36 □ /61 /55 /34 □
/62 /34 /57 /61 □ /36 /37 □ /59 /69 □ /92 /67 /36 /66 /63 /34 /64 /33 /34 /79 □ □ /84 □ /58 /34 /32 /63 /56 /85 /34 □ /61 /55 /32 /61 □ /84 □ /32 /59 □ /67 /36 /66 □ /58 /34 /57 /78/36 /67 /57 /56 /62 /63 /34 □ /37 /36 /58 □ /61 /55 /34 □ /63 /36 /67 /33 /98 /61 /34 /58 /59 □ /59 /32 /56 /67 /61 /34 /67 /32 /67 /72 /34 □ /36 /37 □ /32 /63 /63 □ /57 /61 /36 /58 /59 /66/32 /61 /34 /58 □
/59 /32 /67 /32 /33 /34 /59 /34 /67 /61 □ /37 /32 /72 /56 /63 /56 /61 /56 /34 /57 □ /60 /67 /61 /56 /63 □ /32 □ /61 /58 /32 /67 /57 /37 /34 /58 □ /36 /37 □ /36 /66 /67 /34 /58 /57 /55 /56 /78□ /55 /32 /57 □ /62 /34 /34 /67 □ /32 /78 /78 /58 /36 /74 /34 /64 □ /62 /69 □ /61 /55 /34 □ /65 /34 /36 /58 /33 /34 /61 /36 /66 /67 □ /68 /36 /60 /67 /61 /69 □ /77 /61 /36 /58 /59 /66 /32/61 /34 /58 □
/71 /56 /74 /56 /57 /56 /36 /67 /79 □
□
□
□
/73 /78 /78 /63 /56 /72 /32 /67 /61 /99 /57 □ /31 /58 /56 /67 /61 /34 /64 □ /89 /32 /59 /34 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □
□
□
/73 /78 /78 /63 /56 /72 /32 /67 /61 /99 /57 □ /77 /56 /33 /67 /32 /61 /60 /58 /34 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82/82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □
□
□
/71 /32 /61 /34 /81 □ /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 /82 □
□
□
□
□
□
Page 75 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Appendix D
As-Built Certification Form
Page 76 of 229
/0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □
□/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□
/31 /32 /33 /34 /35 /36 /37 /38 □ /39 /40 /41 /38 /36 /42 /36 /43 /44 /38 /36 /45 /46 □ /47 /45 /41 /48 □ □ □ □ □ □ □ □ □ □ □ □ □ /49 /44 /50 /40 □ /51 □ /45 /42 □ /52 □
□
/54 /55 /56 /57 /58 /55 /59 /56 /60 /61 □ /62 /56 /63 /61 /59 /64 □
/65 /55 /66 /67 /57 /59 /68/55 /61 /59 □ /56 /69 □ /70 /63 /71 /72 /73 /74 □ /75 /55 /57 /76 /73 /74 /55 /77 □
□
□ □ □ □ □ □ □ □ □ □ □ □
□
□
/80 /81 /82 /83 /84 /85 /86 /87 □ /89 /90 /91 /87 /85 /92 /85 /93 /94 /87 /85 /95 /96 □ /97 /95 /91 /98 □
□
/99 /44 /38 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ □ /49 /40 /41 /48 /36 /38 □ /102 /45 /103 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101□ □ /104 /44 /105 □ /106 /44 /107 □ /102 /45 /103 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/49 /41 /45 /108 /40 /43 /38 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/31 /109 /109 /41 /40 /32 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
□
/104 /110 /107 /40 □ /45 /42 □ /47 /44 /43 /36 /37 /36 /38 /110 /100 □
/99 /40 /38 /40 /46 /38 /36 /45 /46 /100 □ □ □ □ □
□ □ □ □ □/112 /40 /38 /40 /46 /38 /36 /45 /46 /100 □ □ □ □ □□ □ □ □ □/113 /46 /42 /36 /37 /38 /41 /44 /38 /36 /45 /46 /100 □ □ □ □ □□
□
/114 /38 /41 /35 /43 /38 /35 /41 /40 □ /112 /40 /42 /40 /41 /40 /46 /43 /40 □ /102 /45 /103 □ /45 /46 □ /49 /37 /44 /46 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/99 /40 /32 /36 /50 /46 /40 /109 □ /114 /38 /45 /41 /44 /50 /40 □ /115 /45 /37 /35 /48 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/31 /32 □ /114 /38 /45 /41 /44 /50 /40 □ /115 /45 /37 /35 /48 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
□
/116 /90 /91 /98 /94 /96 /90 /96 /87 □ /116 /95 /95 /86 □ /117 /86 /90 /118 /94 /87 /85 /95 /96 □ /119 /120 /90 /87 /90 /96 /87 /85 /95 /96 □ /116 /95 /96 /121 □ /122 /96 /86 /123 /124
□
□ /99 /40 /32 /36 /50 /46 /40 /109 □ /49 /40 /41 /48 /44 /46 /40 /46 /38 □ /49 /45 /45 /37 □ /125 /37 /40 /126 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
□ /31 /32 □ /49 /40 /41 /48 /44 /46 /40 /46 /38 □ /49 /45 /45 /37 □ /125 /37 /40 /126 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/120 /90 /86 /90 /94 /81 /90 □ /120 /94 /87 /90□
/127 /87 /95 /91 /98 □ /117 /118 /90 /96 /87 □ /117 /128 /85 /81 /87 /85 /96 /129 □ /130 /90 /81 /85 /129 /96 /90 /121 □ /80 /81 /82 /83 /84 /85 /86 /87 □
/131 □ /132 /90 /94 /91 □ □ □ □
/133 /134 □ /132 /90 /94 /91 □ □ □ □
/131 /135 □ /132 /90 /94 /91 □ □ □ □
/133 /134 /134 □ /132 /90 /94 /91 □ □ □ □
□
/136/94 /87 /90 /91 □ /137 /84 /94 /86 /85 /87 /123 □ /122 /91 /85 /92 /85 /93 /90
□
/99 /40 /32 /36 /50 /46 /40 /109 □ /138 /35 /38 /37 /40 /38 □ /99 /40 /126 /36 /43 /40 □ /104 /110 /107 /40 □ /44 /46 /109 □ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □
□ /104 /110 /107 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /125 /37 /40 /126 /44 /38 /36 /45 /46 /100□ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
□ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/31 /32 /33 /34 /35 /36 /37 /38 □ /138 /35 /38 /37 /40 /38 □ /104 /110 /107 /40 □ /44 /46 /109 □ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □
□ /104 /110 /107 /40 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □ /125 /37 /40 /126 /44 /38 /36 /45 /46 /100□ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
□ /99 /36 /48 /40 /46 /32 /36 /45 /46 /32 /100 □ /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101/101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 /101 □
/127 /87 /95 /91 /98 /139 /94 /87 /90 /91 □ /130 /85 /118 /85 /81 /85 /95 /96
□
/140 /9 /141 □ /142 /12 /28 /13 /21 /29 □ /142 /12 /28 /22 /21 /11 /12 /28 /20 /8 □
/143 /5 /144 □ /145 /27 /22 /8 /146 /8 /13 □ /145 /21 /22 /8 /8 /21 □
/147 /8 /12 /22 /26 /8 /21 /12 /24 /13 /148 □ /145 /142 □ /5 /144 /1 /1 /15 □
Page 77 of 229
/0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □
□/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□
/31 /32 /33 /34 /35 /36 /37 /38 □ /39 /40 /41 /38 /36 /42 /36 /43 /44 /38 /36 /45 /46 □ /47 /45 /41 /48 □ □ □ □ □ □ □ □ □ □ □ □ □ /49 /44 /50 /40 □ /51 □ /45 /42 □ /52 □
/53 /54 /55 /56 /57 /54 /58 □ /60 /61 /62 /63 /64 /62□
/65 /40 /32 /36 /50 /46 /40 /66 □ /67 /35 /38 /37 /40 /38 □ /65 /40 /68 /36 /43 /40 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □
□ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
□ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
/31 /32 /33 /34 /35 /36 /37 /38 □ /67 /35 /38 /37 /40 /38 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □
□ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
□ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
/75 /64 /76 /77 /78 /79 /57 /54 /58 □ /77 /54 □ /60 /80 /64 /54 /81 /63 /77 /82 □ /60 /61 /62 /63 /64 /62
□
/65 /40 /32 /36 /50 /46 /40 /66 □ /67 /35 /38 /37 /40 /38 □ /65 /40 /68 /36 /43 /40 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □
□ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
□ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
/31 /32 /33 /34 /35 /36 /37 /38 □ /67 /35 /38 /37 /40 /38 □ /69 /70 /71 /40 □ /44 /46 /66 □ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □
□ /69 /70 /71 /40 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □ /74 /37 /40 /68 /44 /38 /36 /45 /46 /72□ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
□ /65 /36 /48 /40 /46 /32 /36 /45 /46 /32 /72 □ /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73/73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 /73 □
□
□ /83 /84 /75 □ /85 /60 □
/86 /32 □ /38 /87 /40 □ /88 /89 /89 □ /70 /40 /44 /41 □ /44 /46 /66 □ /51 /90 □ /87 /45 /35 /41 □ /32 /38 /45 /41 /48 □ /32 /44 /42 /40 /37 /70 □ /66 /36 /32 /43 /87 /44 /41 /50 /40 /66/91 □
□ □
/31 /41 /40 □ /40 /46 /40 /41 /50 /70 □ /66 /36 /32 /32 /36 /71 /44 /38 /45 /41 /32 /92 □ /87 /40 /44 /66 /93 /44 /37 /37 /32 □ /44 /46 /66 □ /32 /71 /36 /37 /37 /93 /44 /70 /32 □ /71 /41 /45/71 /40 /41 /37 /70 □ /43 /45 /46 /32 /38 /41 /35 /43 /38 /40 /66 □ /44 /46 /66 □ /36 /46 /32 /38 /44 /37 /37 /40 /66 □
/44 /43 /43 /45 /41 /66 /36 /46 /50 □ /38 /45 □ /38 /87 /40 □ /71 /37 /44 /46 /32 /91 □
□ □
/31 /41 /40 □ /40 /48 /94 /44 /46 /95 /48 /40 /46 /38 /32 □ /44 /46 /66 /96 /45 /41 □ /40 /97 /43 /44 /68 /44 /38 /40 /66 □ /32 /37 /45 /71 /40 /32 □ /32 /38 /44 /94 /37 /40 □ /44 /46 /66 □/43 /45 /68 /40 /41 /40 /66 □ /36 /46 □ /44 □ /32 /35 /36 /38 /44 /94 /37 /40 □ /48 /44 /46 /46 /40 /41 □
/44 /32 □ /38 /45 □ /71 /41 /40 /68 /40 /46 /38 □ /40 /41 /45 /32 /36 /45 /46 /91 □
□ □
/86 /32 □ /38 /87 /40 □ /32 /38 /45 /41 /48 /93 /44 /38 /40 /41 □ /66 /41 /44 /36 /46 /44 /50 /40 □ /32 /70 /32 /38 /40 /48 □ /98 /71 /36 /71 /40 /32 /92 □ /43 /44 /38 /43 /87 □ /94 /44 /32/36 /46 /32 /92 □ /40 /38 /43 /99/100 □ /43 /45 /46 /32 /38 /41 /35 /43 /38 /40 /66 □ /36 /46 □
/44 /43 /43 /45 /41 /66 /44 /46 /43 /40 □ /93 /36 /38 /87 □ /38 /87 /40 □ /44 /71 /71 /41 /45 /68 /40 /66 □ /71 /37 /44 /46 /32 /91 □
□ □
/101 /44 /32 □ /44 /43 /43 /35 /48 /35 /37 /44 /38 /40 /66 □ /32 /40 /66 /36 /48 /40 /46 /38 □ /94 /40 /40 /46 □ /41 /40 /48 /45 /68 /40 /66 □ /42 /41 /45 /48 □ /38 /87 /40 □ /32 /38 /45 /41/48 /93 /44 /38 /40 /41 □ /66 /40 /38 /40 /46 /38 /36 /45 /46 □ /44 /46 /66 □
/41 /40 /38 /40 /46 /38 /36 /45 /46 □ /71 /45 /46 /66 /32 /91 □
□ □
/31 /41 /40 □ /40 /46 /40 /41 /50 /70 □ /66 /36 /32 /32 /36 /71 /44 /38 /45 /41 /32 /92 □ /66 /41 /44 /36 /46 /44 /50 /40 □ /32 /38 /41 /35 /43 /38 /35 /41 /40 /32 /92 □ /44 /46 /66 □ /32 /38/45 /41 /48 □ /37 /36 /46 /40 /32 □ /42 /41 /40 /40 □ /45 /42 □ /32 /40 /66 /36 /48 /40 /46 /38 □ /44 /46 /66 □
/66 /40 /94 /41 /36 /32 /91 □
□ □
/101 /44 /32 □ /38 /87 /40 □ /66 /36 /32 /38 /35 /41 /94 /40 /66 □ /44 /41 /40 /44 □ /42 /45 /41 □ /38 /87 /40 □ /40 /46 /38 /36 /41 /40 □ /32 /36 /38 /40 □ /44 /43 /87 /36 /40 /68 /40 /66□ /102 /89 /103 □ /32 /38 /44 /94 /36 /37 /36 /104 /44 /38 /36 /45 /46 □ /98 /71 /40 /41 /48 /44 /46 /40 /46 /38 □
/50 /41 /45 /35 /46 /66 □ /43 /45 /68 /40 /41 □ /44 /46 /66 □ /102 /89 /103 □ /32 /38 /44 /94 /37 /40 □ /71 /40 /41 □ /32 /105 /35 /44 /41 /40 □ /70 /44 /41 /66 /100 /91 □
□ □
□
□
□
□
□
□
Page 78 of 229
/0 /1 /2 /3 /4 /1 /4 /3 /2 /4 /5 /1 □ /7 /8 /9 /8 /10 /11 /12 /13 /8 □ /14 □ /0 /1 /2 /3 /4 /1 /4 /3 /2 /15 /15 /4 □ /16 /17 /18 □
□/20 /21 /12 /22 /23 /24 /17 /21 /8 /22 /25/26 /8 /12 /22 /26 /8 /21 /12 /24 /13 /27 /12 /28 /13 /21 /29 /20 /27 /30 /12 /22 /26□
/31 /32 /33 /34 /35 /36 /37 /38 □ /39 /40 /41 /38 /36 /42 /36 /43 /44 /38 /36 /45 /46 □ /47 /45 /41 /48 □ □ □ □ □ □ □ □ □ □ □ □ □ /49 /44 /50 /40 □ /51 □ /45 /42 □ /51 □
/52 /53 /54 /55 □ /57 /58 /59 /58 /60 /53 /61 /58 /62 □ /63 /64 /61 /58 /65 /59 /66 /53 /67 /54 □ /68 /65 /58 /69□
/70 /71/72 □ /73 /67 /64 /74 /58 /65 □ /63 /64 /61 /58 /65 /59 /66 /53 /67 /54 □ /68 /65 /58 /69 □ /75 /69 /76 /65 /58 /54 /77 □ /63 /64 /61 /58 /65 /59 /66 /53 /67 /54 □ /68 /65 /58 /69 □/75 /54 /78 /79 □ /80 /55 /79 /77 □
□ □ □
□ □ □
□ □ □
□
/34 /81 □ /82 /37 /44 /43 /36 /46 /50 □ /48 /81 □ /82 /41 /45 /42 /40 /32 /32 /36 /45 /46 /44 /37 □ /32 /38 /44 /48 /82 □ /44 /46 /83 □ /32 /36 /50 /46 /44 /38 /35 /41 /40 □ /45 /46 □ /38/84 /36 /32 □ /82 /44 /82 /40 /41 /85 □ /86 □ /43 /40 /41 /38 /36 /42 /81 □ /38 /84 /44 /38 □ /38 /84 /36 /32 □ /32 /38 /45 /41 /48 /87 /44 /38 /40 /41 □ /48 /44 /46 /44 /50 /40 /48 /40 /46/38 □
/42 /44 /43 /36 /37 /36 /38 /81 □ /44 /46 /83 □ /36 /38 /32 □ /44 /32 /32 /45 /43 /36 /44 /38 /40 /83 □ /32 /38 /41 /35 /43 /38 /35 /41 /40 /32 □ /44 /41 /40 □ /43 /45 /46 /32 /38 /41 /35 /43/38 /40 /83 □ /44 /43 /43 /45 /41 /83 /36 /46 /50 □ /38 /45 □ /38 /84 /40 □ /44 /82 /82 /41 /45 /88 /40 /83 □ /83 /40 /32 /36 /50 /46 □ /45 /46 □ /42 /36 /37 /40 □ /87 /36 /38 /84 □
/89 /40 /45 /41 /50 /40 /38 /45 /87 /46 □ /39 /45 /35 /46 /38 /81 □ /44 /46 /83 □ /90 /39 /91 /92 /93 /39 /94 □ □ /86 □ /42 /35 /41 /38 /84 /40 /41 □ /43 /40 /41 /38 /36 /42 /81 □ /38 /84/44 /38 □ /44 /37 /37 □ /38 /84 /40 □ /83 /41 /44 /36 /46 /44 /50 /40 □ /44 /41 /40 /44 /32 □ /83 /40 /32 /36 /50 /46 /40 /83 □ /38 /45 □ /83 /41 /44 /36 /46 □ /38 /45 □ /38 /84 /36 /32□ /82 /45 /46 /83 □
/36 /46 □ /42 /44 /43 /38 □ /83 /45 /85 □ /44 /46 /83 □ /38 /84 /40 □ /45 /35 /38 /42 /37 /45 /87 □ /42 /41 /45 /48 □ /38 /84 /40 □ /82 /45 /46 /83 □ /36 /32 □ /40 /95 /35 /44 /37 □/38 /45 □ /45 /41 □ /37 /40 /32 /32 □ /38 /84 /44 /46 □ /48 /44 /96 /36 /48 /35 /48 □ /44 /37 /37 /45 /87 /44 /97 /37 /40 □ /42 /45 /41 □ /38 /84 /40 □ /98 /85 □ /99 /100 □ /44 /46 /83□ /98 /101 □
/81 /40 /44 /41 □ /38 /87 /40 /46 /38 /81 /33 /42 /45 /35 /41 □ /84 /45 /35 /41 □ /32 /38 /45 /41 /48 □ /40 /88 /40 /46 /38 /32 /94 □ □ /86 □ /42 /35 /41 /38 /84 /40 /41 □ /43 /40 /41 /38/36 /42 /81 □ /38 /84 /44 /38 □ /38 /84 /40 □ /43 /45 /82 /81 □ /45 /42 □ /32 /38 /44 /48 /82 /40 /83 □ /43 /44 /37 /43 /35 /37 /44 /38 /36 /45 /46 /32 □ /44 /38 /38 /44 /43 /84 /40 /83 □/84 /40 /41 /38 /45 □
/87 /44 /32 □ /35 /32 /40 /83 □ /38 /45 □ /83 /40 /38 /40 /41 /48 /36 /46 /40 □ /38 /84 /40 □ /31 /32 /33 /34 /35 /36 /37 /38 □ /90 /38 /45 /41 /44 /50 /40 □ /102 /45 /37 /35 /48 /40 /32 /85□ /83 /40 /38 /40 /46 /38 /36 /45 /46 □ /45 /42 □ /38 /84 /40 □ /98 /85 □ /99 /100 /85 □ /98 /101 □ /81 /40 /44 /41 □ /38 /87 /40 /46 /38 /81 /33 /42 /45 /35 /41 □ /84 /45 /35 /41 □ /32/38 /45 /41 /48 □
/40 /88 /40 /46 /38 /32 □ /44 /46 /83 □ /38 /84 /40 □ /41 /40 /95 /35 /36 /41 /40 /83 □ /41 /40 /37 /40 /44 /32 /40 □ /45 /42 □ /38 /84 /40 □ /42 /36 /41 /32 /38 □ /42 /37 /35 /32 /84 □/42 /45 /41 □ /87 /44 /38 /40 /41 □ /95 /35 /44 /37 /36 /38 /81 □ /38 /41 /40 /44 /38 /48 /40 /46 /38 /94 □ □ /47 /45 /41 □ /35 /46 /83 /40 /41 /50 /41 /45 /35 /46 /83 □ /83 /40 /38 /40 /46/38 /36 /45 /46 □ /44 /46 /83 □
/87 /44 /38 /40 /41 □ /95 /35 /44 /37 /36 /38 /81 □ /48 /44 /46 /44 /50 /40 /48 /40 /46 /38 □ /32 /81 /32 /38 /40 /48 /32 /85 □ /86 □ /43 /40 /41 /38 /36 /42 /81 □ /38 /84 /44 /38 □ /38 /84/40 /81 □ /87 /40 /41 /40 □ /83 /40 /32 /36 /50 /46 /40 /83 □ /44 /46 /83 □ /36 /46 /32 /38 /44 /37 /37 /40 /83 □ /82 /40 /41 □ /38 /84 /40 □ /48 /44 /46 /35 /42 /44 /43 /38 /35 /41 /40 /41/103 /32 □
/41 /40 /43 /45 /48 /48 /40 /46 /83 /44 /38 /36 /45 /46 /32 □ /44 /46 /83 □ /38 /84 /40 □ /44 /82 /82 /41 /45 /88 /40 /83 □ /82 /37 /44 /46 /32 /94 □
□
□
□
/72 /66 /104 /105 /69 /55 /67 /65 /58 □ /69 /105 /62 □ /72 /58 /69 /60 □ □ □ □/106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 □
□ □ □ □ □ □ □ □ □ □ /93 /46 /50 /36 /46 /40 /40 /41 □
□
□
□ □ □ □ □ □ □ □
□ □ □ □ □ □ □ /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106 /106/106 □
□ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ □ /39 /45 /48 /82 /44 /46 /81 □ /107 /44 /48 /40 □
□
□
□
/73 /53 /55 /58 /108 □ /109 /110 □ /112 /113 /114 □ /115 /116 /117 /118 /114 /119 /112 □ /113 /120 /121 □ /122 /117 /116 /114 □ /112 /113 /120 /123 □ /117 /123 /114 □ /124 /112 /117 /116 /122 /125 /120 /112 /114 /116 □ /126/120 /123 /120 /127 /114 /122 /114 /123 /112 □ /128 /120 /119 /129 /130 /129 /112 /131 □ /117 /123 □ /112 /113 /114 □ /121 /129 /112 /114 □ /112 /113 /114 /123 □ /114 /120 /119 /113 □ /110 /120 /119 /129 /130 /129 /112 /131 □ /125/129 /130 /130 □ /116 /114 /132 /133 /129 /116 /114 □ /120 □ /121 /114 /115 /120 /116 /120 /112 /114 □ /110 /117 /116 /122 /134 □ □
/135 /112 /112 /120 /119 /113 □ /121 /112 /120 /122 /115 /114 /136 □ /135 /121 /137 /138 /133 /129 /130 /112 □ /115 /130 /120 /123 /121 □ /120 /123 /136 □ /119 /120 /130 /119 /133 /130 /120 /112 /129 /117 /123 /121 □ /112 /117 □ /112/113 /129 /121 □ /136 /117 /119 /133 /122 /114 /123 /112 /134 □
□
Page 79 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Appendix E
Georgetown County As-Built Survey Requirements
Page 80 of 229
/0 /1 /2 /3 /4 /5 /6 /7 □ /9 /4 /10 /11 /12 /13 □ /15 /12 /16 /4 /5 /10 /12 /17 /12 /18 /7 /1 /19□
/20 /21 /22 /23 /24 □ /26 □ /27 /28 /29 /30 /31 □ /32 /33 /28 /31 /34 /28 /29 /35 □ /36 /29 /37 /38 /23 /39 /22 /28 /21 /29 □ /39 /30 /29 /29 /21 /22 □ /40 /23 □ /37 /39 /41 /23 /34 /33 /31/23 /34 □ /33 /29 /22 /28 /31 □ /30 □ /27 /28 /29 /30 /31 □
/42 /22 /21 /43 /44 /45 /30 /22 /23 /43 □ /36 /29 /37 /38 /23 /39 /22 /28 /21 /29 □ /28 /37 □ /30 /39 /39 /23 /38 /22 /23 /34 /46 □
/47 /48 □ /50 /51 /52 □ /53 /52 /54 /55 /56 /57 /57 /52 /52 □ /58 /51 /59 /60 /60 □ /53 /54 /61 /62 /56 /63 /52 □ /59 /64 □ /65 /59 /58 /66 /67 /68 /56 /60 /57 /69 □ /63 /54 /59 /70 /56 /64/71 □ /53 /54 /52 /53 /59 /54 /52 /63 □ /59 /64 /63 □ /72 /52 /54 /57 /56 /73 /56 /52 /63 □ /67 /74 □ /59 □
/75 /56 /72 /52 /64 /58 /52 /63 □ /76 /68 /67 /60 /56 /72 □ /75 /59 /64 /63 □ /77 /68 /54 /62 /52 /74 /61 /54 /48 □ /78 □ /72 /52 /54 /57 /56 /73 /56 /72 /59 /57 /56 /61 /64 □ /58 /57 /59 /57/52 /55 /52 /64 /57 □ /61 /64 □ /57 /51 /52 □ /53 /60 /59 /64 /58 □ /55 /68 /58 /57 □
/67 /52 □ /58 /56 /71 /64 /52 /63 □ /67 /74 □ /57 /51 /52 □ /53 /54 /61 /79 /52 /72 /57 /80 /58 □ /81 /52 /71 /56 /58 /57 /52 /54 /52 /63 □ /82 /64 /71 /56 /64 /52 /52 /54 □ /56 /64 /63 /56/72 /59 /57 /56 /64 /71 □ /57 /51 /59 /57 □ /57 /51 /52 □ /58 /57 /61 /54 /55 /70 /59 /57 /52 /54 □
/55 /59 /64 /59 /71 /52 /55 /52 /64 /57 □ /58 /74 /58 /57 /52 /55 □ /70 /56 /60 /60 □ /73 /68 /64 /72 /57 /56 /61 /64 □ /56 /64 □ /59 /72 /72 /61 /54 /63 /59 /64 /72 /52 □ /70 /56 /57 /51 □/57 /51 /52 □ /59 /53 /53 /54 /61 /62 /52 /63 □ /63 /52 /58 /56 /71 /64 □
/53 /60 /59 /64 /58 /48 □ □
/83 /48 □ /84 /64 □ /60 /56 /52 /68 □ /61 /73 □ /72 /61 /64 /57 /61 /68 /54 /58 □ /61 /62 /52 /54 □ /57 /51 /52 □ /52 /64 /57 /56 /54 /52 □ /58 /56 /57 /52 □ /58 /53 /61 /57 □ /52 /60/52 /62 /59 /57 /56 /61 /64 /58 □ /70 /56 /60 /60 □ /67 /52 □ /59 /72 /72 /52 /53 /57 /52 /63 □ /59 /60 /61 /64 /71 □
/70 /56 /57 /51 □ /57 /51 /52 □ /63 /52 /58 /56 /71 /64 □ /52 /64 /71 /56 /64 /52 /52 /54 /80 /58 □ /59 /63 /63 /56 /57 /56 /61 /64 /59 /60 □ /72 /52 /54 /57 /56 /73 /56 /72 /59 /57 /56 /61 /64□ /57 /51 /59 /57 □ /57 /51 /52 □ /58 /56 /57 /52 □ /63 /54 /59 /56 /64 /58 □ /57 /61 □ /57 /51 /52 □
/58 /56 /57 /52 /80 /58 □ /58 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /55 /59 /64 /59 /71 /52 /55 /52 /64 /57 □ /58 /74 /58 /57 /52 /55 □ /56 /64 □ /59 /72 /72 /61 /54 /63 /59 /64 /72 /52 □ /70/56 /57 /51 □ /57 /51 /52 □ /53 /52 /54 /55 /56 /57 /57 /52 /63 □
/63 /52 /58 /56 /71 /64 /48 □
/85 /48 □ /84 /64 /72 /60 /68 /63 /52 □ /71 /54 /59 /63 /52 /58 /86 /72 /61 /64 /57 /61 /68 /54 /58 /86 /63 /52 /53 /57 /51 /58 □ /73 /61 /54 □ /53 /61 /64 /63 /87 /58 /88 /48 □ /89 /54 /59 /56/64 /59 /71 /52 □ /53 /61 /64 /63 /58 □ /58 /51 /59 /60 /60 □ /58 /51 /61 /70 □
/72 /61 /64 /57 /61 /68 /54 /58 /90 □ /57 /61 /53 □ /61 /73 □ /67 /59 /64 /91 /90 □ /64 /61 /54 /55 /59 /60 □ /70 /59 /57 /52 /54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /57 /51 /52 □/58 /56 /63 /52 □ /58 /60 /61 /53 /52 □ /61 /73 □ /57 /51 /52 □ /53 /61 /64 /63 /87 /58 /88 /90 □
/53 /54 /61 /62 /56 /63 /52 □ /53 /61 /64 /63 □ /63 /59 /57 /59 □ /57 /59 /67 /60 /52 □ /56 /64 /63 /56 /72 /59 /57 /56 /64 /71 □ /57 /51 /52 □ /53 /61 /64 /63 □ /64 /59 /55 /52 /90 □ /57/61 /53 □ /61 /73 □ /67 /59 /64 /91 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □
/67 /61 /57 /57 /61 /55 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /64 /61 /54 /55 /59 /60 □ /70 /59 /57 /52 /54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /90 □ /59 /64 /63 □ /58 /57 /59 /71 /52□ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /73 /61 /54 □ /57 /51 /52 □ /83 /90 □ /47 /92 /90 □
/83 /93 /90 □ /59 /64 /63 □ /47 /92 /92 □ /74 /52 /59 /54 □ /83 /94 □ /51 /61 /68 /54 □ /58 /57 /61 /54 /55 □ /52 /62 /52 /64 /57 /58 /48 □
/94 /48 □ /82 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 □ /61 /73 □ /59 /60 /60 □ /58 /57 /54 /68 /72 /57 /68 /54 /52 /58 /90 □ /56 /64 /72/60 /68 /63 /56 /64 /71 □ /76 /56 /53 /52 □ /59 /64 /63 □ /61 /54 /56 /73 /56 /72 /52 □ /56 /64 /62 /52 /54 /57 /58 □
/59 /64 /63 □ /63 /56 /59 /55 /52 /57 /52 /54 /58 /90 □ /95/52 /56 /54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 /90 □ /81 /56 /58 /52/54 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □
/63 /56 /55 /52 /64 /58 /56 /61 /64 /58 /90 □ /82 /55 /52 /54 /71 /52 /64 /72 /74 □ /58 /53 /56 /60 /60 /70 /59 /74 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □ /63 /56 /55 /52 /64/58 /56 /61 /64 /58 /90 □ /75 /61 /72 /59 /57 /56 /61 /64 /58 □ /59 /64 /63 □
/56 /64 /62 /52 /54 /57 /58 □ /73 /61 /54 □ /59 /60 /60 □ /53 /56 /53 /52 /58 □ /63 /56 /58 /72 /51 /59 /54 /71 /56 /64 /71 □ /56 /64 /57 /61 □ /57 /51 /52 □ /53 /61 /64 /63 /48 □
/93 /48 □ /89 /54 /59 /56 /64 /59 /71 /52 □ /53 /56 /53 /52 /58 □ /70 /56 /57 /51 □ /58 /56 /96 /52 /90 □ /55 /59 /57 /52 /54 /56 /59 /60 /90 □ /60 /52 /64 /71 /57 /51 /90 □ /58 /60 /61 /53/52 /90 □ /59 /64 /63 □ /56 /64 /62 /52 /54 /57 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 /48 □
/97 /48 □ /89 /54 /59 /56 /64 /59 /71 /52 □ /52 /59 /58 /52 /55 /52 /64 /57 /58 □ /70 /56 /57 /51 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 /48 □
/98 /48 □ /99 /64 /63 /52 /54 □ /58 /61 /55 /52 □ /72 /56 /54 /72 /68 /55 /58 /57 /59 /64 /72 /52 /58 □ /59 □ /54 /52 /62 /56 /58 /52 /63 □ /53 /61 /64 /63 □ /54 /61 /68 /57 /56 /64 /71 □/72 /59 /60 /72 /68 /60 /59 /57 /56 /61 /64 /58 □ /70 /56 /60 /60 □ /67 /52 □
/54 /52 /100 /68 /52 /58 /57 /52 /63 □ /56 /73 □ /57 /51 /52 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /61 /54 □ /63 /56 /55 /52 /64 /58 /56 /61 /64 /58 □ /61 /73 □ /57 /51 /52 □ /58 /57/54 /68 /72 /57 /68 /54 /52 /58 □ /60 /56 /58 /57 /52 /63 □ /59 /67 /61 /62 /52 □ /63 /61 □ /64 /61 /57 □
/55 /59 /57 /72 /51 □ /57 /51 /61 /58 /52 □ /68 /58 /52 /63 □ /56 /64 □ /57 /51 /52 □ /59 /53 /53 /54 /61 /62 /52 /63 □ /63 /52 /58 /56 /71 /64 □ /53 /60 /59 /64 /58 /48 □ □
/101 /48 □ /77 /57 /54 /52 /52 /57 □ /64 /59 /55 /52 /58 /90 □ /60 /61 /57 □ /64 /68 /55 /67 /52 /54 /58 /90 □ /60 /61 /57 □ /60 /56 /64 /52 /58 /90 □ /67 /61 /68 /64 /63 /59 /54 /74 □ /59/64 /63 □ /53 /51 /59 /58 /52 □ /60 /56 /64 /52 /58 /48 □ □
/102 /48 □ /76 /59 /62 /52 /55 /52 /64 /57 □ /52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /60 /61 /64 /71 □ /57 /51 /52 □ /72 /52 /64 /57 /52 /54 /60 /56 /64 /52 □ /59 /64 /63 □ /52 /63 /71/52 □ /61 /73 □ /53 /59 /62 /52 /55 /52 /64 /57 □ /59 /57 □ /55 /59 /103 /56 /55 /68 /55 □
/47 /92 /92 /66 /73 /61 /61 /57 □ /56 /64 /57 /52 /54 /62 /59 /60 /58 /48 □ □
/47 /92 /48 □ /89 /54 /59 /56 /64 /59 /71 /52 □ /63 /56 /57 /72 /51 /52 /58 □ /59 /64 /63 □ /58 /70 /59 /60 /52 /58 □ /70 /56 /57 /51 □ /72 /54 /61 /58 /58 □ /58 /52 /72 /57 /56 /61 /64 □/52 /60 /52 /62 /59 /57 /56 /61 /64 /58 □ /59 /57 □ /55 /59 /103 /56 /55 /68 /55 □ /47 /92 /92 /66
/73 /61 /61 /57 □ /56 /64 /57 /52 /54 /62 /59 /60 /58 /48 □
/47 /47 /48 □ /76 /54 /61 /62 /56 /63 /52 □ /59 /64 □ /78 /68 /57 /61 /104 /78 /89 □ /63 /56 /71 /56 /57 /59 /60 □ /89 /95/105 □ /59 /64 /63 □ /76 /89 /106 □ /73 /56 /60 /52 □ /61 /73 □/57 /51 /52 □ /59 /58 /66 /67 /68 /56 /60 /57 □ /63 /54 /59 /70 /56 /64 /71 □ /61 /64 □ /77 /104 □
/77 /57 /59 /57 /52 □ /76 /60 /59 /64 /52 □ /104 /61 /61 /54 /63 /56 /64 /59 /57 /52 □ /77 /74 /58 /57 /52 /55 □ /107 /78 /89 □ /101 /85 □ /89 /59 /57 /68 /55 /48 □ □
/47 /83 /48 □ /76 /54 /61 /62 /56 /63 /52 □ /59 □ /72 /61 /53 /74 □ /61 /73 □ /57 /51 /52 □ /77 /104 /89 /108 /50 □ /54 /52 /60 /52 /59 /58 /52 □ /60 /52 /57 /57 /52 /54 □ /70 /51 /52 /54/52 □ /52 /64 /72 /54 /61 /59 /72 /51 /55 /52 /64 /57 □ /53 /52 /54 /55 /56 /57 /87 /58 /88 □
/70 /52 /54 /52 □ /56 /58 /58 /68 /52 /63 /48 □
/47 /85 /48 □ /78 /63 /63 /56 /57 /56 /61 /64 /59 /60 □ /56 /64 /73 /61 /54 /55 /59 /57 /56 /61 /64 □ /55 /59 /74 □ /67 /52 □ /64 /52 /72 /52 /58 /58 /59 /54 /74 □ /59 /58 □ /63 /52 /52 /55/52 /63 □ /59 /53 /53 /54 /61 /53 /54 /56 /59 /57 /52 □ /67 /74 □
/105 /52 /61 /54 /71 /52 /57 /61 /70 /64 □ /104 /61 /68 /64 /57 /74 □ /77 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /109 /59 /64 /59 /71 /52 /54 /48 □
/99 /53 /61 /64 □ /72 /61 /55 /53 /60 /52 /57 /56 /61 /64 □ /61 /73 □ /57 /51 /52 □ /70 /61 /54 /91 /90 □ /59 □ /73 /56 /64 /59 /60 □ /56 /64 /58 /53 /52 /72 /57 /56 /61 /64 □ /70 /56 /60/60 □ /67 /52 □ /72 /61 /64 /63 /68 /72 /57 /52 /63 □ /67 /74 □ /57 /51 /52 □ /89 /52 /53 /59 /54 /57 /55 /52 /64 /57 □ /57 /61 □
/63 /52 /57 /52 /54 /55 /56 /64 /52 □ /56 /73 □ /57 /51 /52 □ /72 /61 /55 /53 /60 /52 /57 /52 /63 □ /70 /61 /54 /91 □ /51 /59 /58 □ /67 /52 /52 /64 □ /72 /61 /64 /58 /57 /54 /68 /72 /57 /52/63 □ /56 /64 □ /59 /72 /72 /61 /54 /63 /59 /64 /72 /52 □ /70 /56 /57 /51 □ /57 /51 /52 □
/77 /57 /61 /54 /55 /70 /59 /57 /52 /54 □ /76 /60 /59 /64 /48 □
/110 /111 /112 /113 /114 □ /116 /117 /118 /119 /120 /121 /122 /112 □ /117 /120 /123 /124 /113 /125 □ /126 /127 /128 □ /129 /111 /123 □ /126 /127 /126 /122 /125 /117 /121 /117 □ /130 /120 /117 /112 □ /119 /113 □ /117 /120 /119 /130/121 /112 /112 /113 /128 □ /126 /127 /128 □ /126 /131 /131 /113 /132 /112 /113 /128 □ /119 /125 □ /112 /133 /113 □
/134 /113 /132 /126 /123 /112 /130 /113 /127 /112 □ /119 /113 /135 /111 /123 /113 □ /110 /111 /112 /121 /131 /113 □ /111 /135 □ /136 /113 /123 /130 /121 /127 /126 /112 /121 /111 /127 □ /137 /110 /138 /136 /139 □ /121 /117 □ /117 /120/119 /130 /121 /112 /112 /113 /128 /48 □
□
Page 81 of 229
Stormwater Design Manual July 2025
Georgetown County, South Carolina
Appendix F
SCDES Notice of Intent (NOI)
Page 82 of 229
NOTICE OF INTENT (NOI)
For Coverage(s) of Primary Permittees
Under South Carolina NPDES General Permit
For Stormwater Discharges From Construction Activities SCR100000
(Maintain As Part of On-Site SWPPP)
For Official Use Only
File Number: ______________________
Permit Number: SCR10_____________
Submittal Package Complete: ___________________
Submission of this Notice of Intent constitutes notice that
the Applicant identified in Section II intends to be
authorized as a Primary Permi ttee in the state of South
Carolina under NPDES General Permit SCR1000000.
Fees required for review and NPDES coverage of each
application type are as listed on page 2 of the
Instructions.
Date: ____________________________ Check if project is receiving SCIIP Funding Grant #:
Project/Site Name: _____________________________________________________ County: ______________________________________
(Modification or Change of Information Only) Prior Approved NPDES Permit or File Number: ___________________________________
Do you want this project to be considered for the Expedited Review Program (ERP)? Yes or No (See instructions)
I. Notice of Intent (NOI) Application Type(s)
A. Project (Application/Review) Type(s) (Select ALL that apply):
New Project (Initial Notification) Ongoing Project: Permitted or Un-Permitted
Late Notification Low I mpact Development (LID) or Project Design Above Regulatory Requirements
New Owner/Operator or Company Name Change (see instructions, attach Form A (Transfer of Ownership))
Major Modification: (see instructions, attach Form B (Major Modifications))
MS4 Project Review
Bureau of Coastal Management (BCM) Review
Change of Information/Other (Specify): __________________________________________________________________
B. If Applicable, identify the entity designated as MS4 Reviewer and MS4 Operator (i.e., Lexington County, City of
Greer, etc.): MS4 Reviewer_________________________________ MS4 Operator ___________________________________
II. Primary Permittee Information Change of Information
Person or Company If a Company, are you a Lending Institution or Government Entity?
Company EIN (If applicable): EIN: _______________________
A. Primary Permittee Name: ______________________________________________________________________________________
Mailing Address: ___________________________________ City: ________________________State: ______ Zip: ______________
Phone: ____________________ Fax: ____________________Email Address: _____________________________________________
B. Contact /ODSA Name (If different from above OR if owner is a company): _________________________________________________
. Mailing Addres
s: ____________________________________City: _______________________State: ______ Zip: _______________
Phone: ____________________ Fax: ____________________Email Address: _____________________________________________
C. Property Owner Name (If different from above): ___________________________________________________________________
Mailing Address: ___________________________________ City: _______________________State: ______ Zip: _______________
Phone: ____________________ Fax: ____________________Email Address: _____________________________________________
III. Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP) Preparer Information Change of Information
A, C-SWPPP Preparer Name: ______________________________________________________________________________________
B. Registered Professional Engineer Landscape Architect Tier B Land Surveyor S. C. Registration #: ____________
C. Company/Firm Name: ___________________________________________________________ S. C. COA # : __________________
Mailing Addres
s: ____________________________________City: ______________________State: ______ Zip: ________________
Phone: ___________________ Fax: _____________________Email Address: ____________________________________________
IV. Project/Site Information Change of Information
A. Type of Construction Activity(ies) (Select ALL that apply):
Commercial Industrial Institutional Mass Grading Linear Utility/Infrastructure
Residential: Single-family Residential: Multi-family Multi-use (Commercial & Residential)
Site Preparation (No New Impervious Area) Other (Specify) ______________________________________________
B. Site Address/Location (street address, nearest intersection, etc.) _____________________________________________
City/Town (If in limits): _______________________________________________________ Zip Code: _________________________
Latitude: ________’____” N Longitude: - ________’____” W (Source): GPS Web Site: _______________________________
Tax Map Number (s) (List all): ______________________________________________________________________________________
DES 2617 (01/2025)
Page 83 of 229
C. Is this site located on Indian Land? Yes No
D. Proposed Start Date: ____________________ Proposed Completion Date: ____________________
E. Disturbed Area (nearest tenth of an acre): ________________ Total Area (acres): ________________
F. Modification Only:(nearest tenth of an acre): Disturbed Area: Current (Approved) Area: _______________
Disturbed Area Change (Increase Only): __________________ Total Disturbed Area (After Change): _________________
G. Is this project part of a Larger Common Plan for Development or Sale (LCP)? Yes No
LCP/ Overall Development Name: ____________________________________ Check here if this is the First Phase.
Previous State Permit/File Number: ____________________ Previous NPDES Coverage Number: SCR10 ______________
H. Any Flooding Problems
exist downstream of or adjacent to this site? Yes No (If yes, provide detailed description of
flooding problems and applicable floodway/flood zone information in the C-SWPPP).
I. Active 6&'(6 Warning Notice, Notice to Comply or Notice of Violation for this site or LCP? Yes No
J. List Relevant State and Federal Environmental Permits or Approvals applied for or obtained for this site (e.g., RCRA,
USACOE, Nationwide, etc.). If None, list None.
_______________________________________________________________________
K. Any Waiver(s)/Variances/Exceptions Requested for this Project? (If yes, identify below and include Waiver Request and
Justifications in the C-SWPPP for each proposed request).
1. Small Co
nstruction Activity Waiver(s) From NPDES permitting (Section 1.4 & Appendix B)? Yes No
If yes, Identify requested waiver: Rainfall Erosivity Waiver TMDL Waiver Equivalent Analysis Waiver
2. Detention Waiver (72-302(B)? Yes No 3. Other (Specify): ____________________________________________
V. Waterbody Information (Attach additional sheet(s) as needed) Change of Information
A. Receiving Waterbody(s) (RWB) Information (List the nearest and next nearest receiving waterbodies to which the sites
stormwater discharges will drain. If stormwater discharges drain to multiple waterbodies, list all such waterbodies).
1. Name of Receiving Waterbodies (RWB) 2. Distance to
RWB (feet)
3. Classification of
RWB
a. Nearest: _______________________________________
b. Next Nearest: __________________________________
c. Coastal Zone ONLY: Coastal Receiving Water (CRW): ________________________ Not Applicable
d. Other Waterbodies: _____________________________
B. Waters of the U.S. / State Information (Attach additional sheet(s) as needed)
Waters of the U.S./ State 1. On the site? 2. Delineated/
Identified? 3. Impacts? 4. Amount of impacts
a. Jurisdictional wetlands Yes No Yes No Yes No _____ Ac
b. Non-jurisdictional wetlands Yes No Yes No Yes No _____ Ac
c. Other Water(s): _________________________ Yes No Yes No Yes No _____ Ac ______ Feet
d. Coastal Zone ONLY: Direct Critical Area Yes No Yes No Yes No _____ Ac ______ Feet
5. If yes for impacts in B.3, describe each impact and activity, and list all permits (e.g., USACOE Nationwide Permit, SCDES
General
Permit) and certifications that have been applied for or obtained for each impact:
_____________________________________________________________________________________________________________________
C. S.C. Navigable Waters (SCNW) Information (Section 2.6.5) The Department will address any issues related to State Navigable
Waters’ Program under SC Regulation 19-450 during the review of the C-SWPPP for activities that will NOT require a 404 permit or a 401
certification. (Attach additional sheet(s) as needed).
1. Are S. C. Navigable Waters (SCNW) on the site: Yes No
a. If no, do not complete this question. Proceed to Section D (Impaired Waterbodies).
b. If yes, provide the name of S.C. Navigable Waters (SCNW) on the site: ________________________________________
2. If yes for C.1, will construction activities cross over or occur in, under, or thru the SCNW? Yes No
If yes, describe SCNW activities (e.g., road crossing, sub-aqueous utility line, temporary or permanent structures, etc.) and
proceed to Section C.3: _______________________________________________________________________________________
3. Identify permits providing coverage of SCNW activities proposed for your site. If NONE, list none.
Permits/Certifications Permit or Certification No. Corresponding Covered SCNW Activity(ies)
a.SCDES General/ Other SCDES Permit
b. USACOE 404 Permit or 401
Certification
c. SCNW Permit
If applied for or issued, identify Date
applied for or issued: ________________
All Activities or Some Activities (Describe):
d. If a SCNW Permit has NOT been applied for provide an additional plan sheet that shows plan and profile views
(drawn to scale) of the SCNW and associated activities. Include a description of all proposed activities on this plan.
DES 2617 (01/2025)
Page 84 of 229
D. Impaired Waterbodies Information (Attach additional sheet(s) as needed)
1. 303(d) Listed Impaired Waterbodies
a. Name of Nearest SCDES Water Quality Monitoring
Stations (WQMS)(s) that receives stormwater from
your construction site and/or thru an MS4 and the
Name of the Corresponding Waterbody?
Nearest SCDES WQMS(s) Corresponding
Waterbody
b.Is this WQMS(s)
listed on the most
current 303(d) List? If
No, proceed
to
Section 2 of this table.
If Yes, complete items
c thru f.
c. List the
po
llutant(s)
identified as
“CAUSES” of
the
impairment
d. Will any
pollutants c
ausing
the impairment be
present in your
site’s construction
stormwater
discharges?
e. If yes fo
r d,
list the “USE
SUPPORT”
impairment(s)
affected by the
pollutant(s)
identified in c.
Yes No Yes No
Yes No Yes No
Yes No Yes No
f. If yes for d above, will use of the BMPs proposed for your project ensure the site’s discharges will NOT contribute to or
cause further WQS violations for the impairment(s) listed in c? Yes No
(NOTE: If no for f, this site is NOT eligible for coverage und er the CGP). See Instructions.
2. TMDL Impaired Waterbodies
a. Name of Nearest SCDES
Water Quality Monitoring
Stations (WQMS)(s) that
receives stormwater from
your construction site and/or
thru an MS4?
b. Has a TMDL(s) been
developed for this
WQMS(s)?
If No, identify as such
below and proceed to
Section VI. If Yes,
complete items c thru f
of this table.
c. If yes for b,
what pollutants
are listed as
“CAUSES” or
causing the
impairment?
d. If yes for b, has
the standard been
“ATTAINED” or “
Fully Supported” for
the impairment(s)?
e. If no for d (Not Attained),
will any pollutants causing the
impairment be present in your
site’s construction stormwater
discharges?
Yes No Yes No Yes No
Yes No Yes No Yes No
Yes No Yes No Yes No
f. If yes for e above, are your discharges consistent with the assumptions and requirements of the TMDL(s)? Yes No
(NOTE: If no for f, this site is NOT eligible for coverage under the CGP). See Instructions.
VI. Signatures and Certifications DO NOT SIGN IN BLACK INK! Read the Certifications below (in entirety). Provide date,
printed name
, and signatures below. If you are a New Owner/Operator, as Primary Permittee you must also sign and date the
applicable Comprehensive SWPPP Acceptance & Compliance Agreement below.
C-SWPPP PREPARER: “One copy of the C-SWPPP, all specifications and supporting calculations, forms, and reports
are herewith submitted and made a part of this application. I have placed my signature and seal on the design
documents submitted signifying that I accept responsibility for the design of the system. Further, I certify to the best
of my knowledge and belief that the design is consistent with the requirements of Title 48, Chapter 14 of the Code of
Laws of SC, 1976 as amended, pursuant to Regulation 72-300 et seq. (if applicable), and in accordance with the
terms and conditions of SCR100000.” (This should be the person identified in Section III).
_________________________________ ____________________________ ______________________________
Printed Name of CISWPPP Preparer Signature of CISWPPP Preparer S. C. Registration #
PRIMARY PERMITTEE: “I or I (on behalf of my company and its contractors and agents), as the case may be, certify
under penalty of law that this document and all attachments were prepared under my direction or supervision in
accordance with a system designed to assure that qualified personnel properly gather and evaluate the
information submitted. Based on my inquiry of the person or persons who manage the system, or those persons
directly responsible for gathering the information, the information submitted is, to the best of my knowledge and
belief, true, accurate, and complete. I understand that SCDES enforcement actions may be taken if the terms
and conditions of the C-SWPPP are not met and I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment for knowing violations.”
“I or I (on behalf of my company and its contractors and agents), as the case may be, also hereby certify that all
land-disturbing construction and associated activity pertaining to this site shall be accomplished pursuant to and in
keeping with the terms and conditions of the approved plans and SCR100000. I also certify that a responsible person
will be assigned to the project for day-to-day control. I hereby grant authorization to the to S. C. Department of
Environmental Services (SCDES) and/or the local implementing agency the right of access to the site at all times for
the purpose of on site inspections during the course of construction and to perform maintenance inspections
following the completion of the land-disturbing activity.” (See Section 122.22 of S.C. Reg. 61I9 for signatory authority
information.) Having understood the above information, I am signing this certification as Primary Permittee to the
aforementioned NPDES general permit.”
_______________________________________ ______________________________________
Printed Name of Primary Permittee Title/Position
_________________________________________ __________________________________________
Signature of Primary Permittee Date Signed
DES 2617 (01/2025)
Page 85 of 229
NPDES CGP FEE SCHEDULE A
(All Counties EXCEPT Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper)
The schedule should be attached to SCDES Form 2617. Do not send payment in window envelope. DO NOT MAIL CASH.
SCDES will notify the Project Owner/ Operator if the subm itted check or credit card payment cannot be processed. The
review clock will start when acceptable payment is received.
1. Identify ( √) the Project Review Type(s)
Enter NPDES Coverage Fee of $125 in the right-hand column if any of the following project/review
types apply to this application. Proceed to Item 2.
(√) NPDES
Coverage Fee
a. Project or LCP (Item IV.G) that will ultimately disturb one (1) acre or more
Note: If your project will ultimately disturb less than one (1) acre AND is NOT a part of a Larger
Common Plan, coverage under SCR100000 is
not required; see
https://des.sc.gov/sites/des/files/Library/D-2628.pdf (Notification Form for Sites Disturbing Less
Than
1-Acre Not Part of a Larger Common Plan, Non-Coastal County”
b. New Owner/Operator (Transfer of Ownership)/Company Name Change
($125 NPDES Coverage fee is required by the Department for Transfers of Ownership and Company Name Changes)
c. Unpermitted Ongoing Project or Late Notification
d. MS4 Project Review (Item I.A and I.B) ($125 payable to Department thru MS4 Reviewer)
e. Other (Specify): _________________________________________________________
$ ________. 00
2. Determine the Project Review Fees (Review fees cannot exceed $2000 for a project)
PROJECT OR LCP THAT WILL ULTIMATELY DISTRUB ONE (1) ACRE OR MORE (√) Review Fees
a. Enter the disturbed area (Item IV.E) for this project. Proceed to Items 2.b and 2.c. ________ (Nearest tenth of an acre)
b. Will this project or LCP (Item IV.G) ultimately disturb more than 1.0 acres Yes No
c. Is this project exempt from S. C. Reg. 72-300 et seq.? Yes No
1. If this project will not ultimately disturb more than 1.0 acre, and is not part of an LCP, your project is automatically covered under this
permit and the NPDES coverage fee and review fee are not required. See the BOW-SPWS for “Less Than 1-Acre of Land Disturbance – Non-
Coastal Counties”.
2. If this project will ultimately disturb more than 1.0 acre, proceed to Item 2.d.
d. Enter the project review fees (based on $100/disturbed area) in the right-hand column.
(Multiply the disturbed area (Item 2.a) by $100/disturbed area). If the disturbed area for this project (Item
2.a.) totals 20.0 acres or more, enter $2000 in the right-hand column. Review fees cannot exceed $2000 for a project.
$ ________. 00
4. Identify the Method of Payment:
Payment by Check:
Attach a signed and dated check payable to SCDES to the front of this Fee Schedule.
Please note tha
t all checks must be less than 30 days old and m ust be for the ent ire required fees.
Paym
ent by Credit Card: (Check here if you wish to pay via credit card using the on-line payment system).
The Department will contact you to pro
vide instructions and the invoice numb er necessary for online payment.
Please provide an e-mail address where the invoice number may be sent: ________________________________
For official use only: Invoice Number ___________________
3. Total Required Fees Add the values in the right-hand columns of Items 1 and 2.d. Proceed to Item 4.
(The Department will not review this project until all required fees are received).
$ ________. 000
DES 2617 (01/2025)
Page 86 of 229
NPDES CGP FEE SCHEDULE B
(ONLY for Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper Counties)
Submit payment for NPDES Coverage fees only to SCDES.
The schedule should be attached to SCDES Form 2617. Do not send payment in window envelope. DO NOT MAIL CASH. SCDES will notify
the Project Owner/ Operator if the check or credit card payment cannot be processed. The review clock will start when acceptable
payment is received and after the project is deemed consistent with the S.C. Coastal Zone Management Plan.
1. Identify ( √) the Project/Review Types
(NOTE: You may ONLY select Item 1.a OR 1.b BELOW). Enter NPDES coverage fee of $125 in the right-
hand column if any of the following project/review types apply to this application. Proceed to Item 2.
(√) NPDES
Coverage Fee(s)
a. Project or LCP that is located within ½ mile of CRW (Item V.A) that will ultimately disturb more
than 0.5 acres (if select a, do not select b)
b. Project or LCP that is NOT located within ½ mile of CRW (Item V.A) that will ultimately disturb
one (1) acre or more (if select b, do not select a)
c. New Owner/Operator (Transfer of Ownership)/Company Name Change
($125 NPDES Coverage fee is required by the Department for Transfers of Ownership and Company Name Changes)
d. Unpermitted Ongoing Project or Late Notification
e. MS4 Project Review (Item I.A and I.B)
f. Other (Specify): _________________________________________________________
$ ________. 00
2. Determine the Project Review Fees (Review fees cannot exceed $2000 for a project).
NOTE: COMPLETE ITEM 2.a BELOW. COMPLETE EITHER SECTION 3 OR SECTION 4. DO NOT COMPLETE BOTH SECTIONS.
a. Enter the disturbed area (Item IV.E) for this project. Proceed to Item 3 OR Item 4. _______ (nearest tenth of an acre)
3. PROJECT OR LCP LOCATED WITHIN ½ MILE OF A CRW (ITEM V.A) (√) Review Fees
a. Will this project or LCP (Item IV.G) ultimately disturb more than 0.5 acres? Yes No
b. Is this project exempt from S. C. Reg. 72-300 et seq.? Yes No
1. If this project will NOT ultimately disturb more than 0.5 acres and is not part of an LCP , your project is automatically covered under this
permit and the NPDES coverage fee and review fee are not required. See section 1.3.1.B. See the BOW-SPWS for “Less Than 1-Acre of
Land Disturbance - Coastal Counties”.
2. If this project or LCP will ultimately disturb more than 0.5 acres, proceed to Item 3.c.
c. Enter the project review fees (based on $100/ disturbed acre) in the right-hand column. (Multiply
the disturbed area (Item 2.a.) by $100/disturbed area). If the disturbed area for this project (Item 2.a.) totals 20.0 acres o r
more, enter $2000 in the right-hand column. Review fees cannot exceed $2000 for a project. Proceed to item 3.d
$ ________. 00
d. Total Required Fees (Coastal Project located WITHIN ½ mile of a CRW (Item V.A)
Add the values in the right-ha nd columns of Items 1 and 3.c . (The Department will not review this project until all
required fees are received). Proceed to Item 5.
$ ________. 00
4. PROJECT OR LCP NOT LOCATED WITHIN ½ MILE OF A CRW (ITEM V.A) (√) Review Fees
a. Will this project or LCP (Item IV.G) ultimately disturb one (1) acre or more? Yes No
b. Is this project exempt from S. C. Reg. 72-300 et seq.? Yes No
1. If this project will NOT ultimately disturb one (1) acre or more, and is not part of an LCP , coverage under SCR100000 is NOT required; see
the BOW-SPWS for “Less Than 1-Acre of Land Disturbance - Coastal Counties”.
2. If this project or LCP will ultimately disturb one (1) acre or more, proceed to Item 4.c.
c. Enter the project review fees (based on $100/ disturbed acre) in the right-hand column. (Multiply
the disturbed area (Item 2.a.) by $100/disturbed area). If the disturbed area for this project (Item 2.a.) totals 20.0 acres or more,
enter $2000 in the right-hand column. Review fees cannot exceed $2000 for a project. Proceed to item 4.d.
$ ________. 00
d. Total Required Fees (Coastal Project NOT located WITHIN ½ mile of a CRW (Item V.A)
Add the values in the right-hand columns of Items 1 and 4.c. (The Department will not review this project until all
required fees are received). Proceed to Item 5.
$ ________. 00
Identify the Method of Payment:5. Payment by Check: (Attach a signed and dated check payable to SCDES to the front of
th
is fee schedule. All checks must be less than 30 days old and must be for the entire amount of required fees). . Pa yment by Credit Card:
(Check here if you wish to pay via credit card using the on-line payment system). The Department will contact you via e-mail to provide instructions
and
the invoice num ber necessary for online payment. Please provide an e-mail address where the invoice number may be sent:
________________________________________
For official use only: Invoice Number ______________________________________________________________________
DES 2617 (01/2025)
Page 87 of 229
Instructions for Completing the Notice or Intent (NOI)
If you are uncertain whether you need to obtain coverage under the NPDES General Permit for Stormwater Discharges from Construction
Activities, SCR100000 (CGP), if you cannot access the websites listed on the NOI and instructions, or if you have any other questions, contact
the Stormwater Permitting Section (SWP) at (803) 898-4300 or Coastal Stormwater Permitting Section (CSWP) at (843) 953-0200. Projects located
in the S.C. Coastal Zone (SCCZ—Beaufort, Berkeley, Charleston, Colleton, Dorchester, Georgetown, Horry, and Jasper counties) are reviewed
by CSWP. Please see the Bureau of Water, Stormwater Permitting website (BOW-
SPWS): https://des.sc.gov/Stormwater for guidance and additional information regarding the CGP.
Who Must File a NOI:
• If S.C. Department of Transportation (SCDOT) is the Primary Permittee (Owner/ Operator), this NOI form (Form 2617)
should not be used.
• The Owner/ Operator of a single project or larger common plan for development or sale (LCP—see item IV.G of
instructions) that will ultimately disturb 1 acre or more (all counties).
• In the SCCZ, the Owner/Operator of a single project or LCP that is located within ½ mile of a coastal receiving
water (CRW) (See item V.A of the instructions) and will ultimately disturb more than 0.5 acres.
• See the BOWISPWS for “Less Than 1-Acre of Land Disturbance - Non-Coastal Counti es” and “Less Than 1-Acre of Land Disturbance
- Coastal Counties”.
Where to File:
See the BOWISPWS for a current list of the areas that are reviewed by Municipal Separate Storm Sewer System (MS4) operators and
entities that have delegated review authority. For projects in these areas, the initial submittal should be made to the MS4 operator;
if initial submittal is made to SCDES for projects in these areas, the review process may be delayed. Please contact the appropriate
entity for additional information and requirements; for example, the MS4 operator may require that a different application form be
submitted. If a project crosses jurisdictional boundaries (e.g., sewer line in Greenville County and the city of Mauldin), then
submittals to all appropriate MS4 operators, delegated entities, and SCDES must be coordinated.
Projects Located in the SCCZ All Other Areas
SCDES—Bureau of Water
Coastal Stormwater Permitting Section
1362 McMillan Ave., Suite 400
Charleston, S.C. 29405
SCDES—Bureau of Water
Stormwater Permitting Section
2600 Bull Street
Columbia, SC 29201I1708
Submittal Package for SWP and CSWP:
•When SCDES performs a full technical review, you must include the original, signed NOI form, appropriate fee schedule (A B)
or with required fees, one (1) copy of the Comprehensive Stormwater Pollution Prevention Plan (C-SWPPP), and one (1) copy of
all
other supporting documentation with the initial submittal. For projects in the non coastal counties disturbing
greater than or equal to 1 acre and less than or equal to 2 acres, one (1) copy of the C-SWPPP and one (1) copy
of supporting documentation can be submitted with the initial submittal. In the SCCZ, applications for Coastal
Zone Consistency certification are to be filed with requests for NPDES construction coverage and will then be routed
internally to the Bureau of Coastal Management (BCM) for review. BCM submittal requirements can be located at:
https://des.sc.gov/CZC
•When a regulated MS4 or entity implementing Regulation 72I300 performs the technical review, you must include a copy of
the MS4 approved NOI form or MS4 approved application, the $125 NPDES fee, and one (1) copy of the MS4 approval. In the
SCCZ,applications for Coastal Zone Consistency certification are to be filed with requests for NPDES construction coverage
and will then be routed internally to BCM for review.
•For projects ultimately disturbing more than 1 acres, the checklist must be completed and attached when SCDES reviews your C-
SWPPP. In the SCCZ, for projects ultimately disturbing more than 0.5 acres and located within ½ mile of a CRW, the checklist must
be completed and attached. See BOWISPWS for the most current version of the checklist. If this project will NOT ultimately disturb
more than 0.5 acres (Coastal Counties) or more than 1.0 acre (Non-Coastal Counties) AND is not part of an LCP, your project is
automatically covered under this permit and the NPDES coverage fee and review fee are not required. See the BOWISPWS for “Less
Than 1-Acre of Land Disturbance - Coastal Counties AND “Less Than 1-Acre of Land Disturbance – Non-Coastal Counties.
•For Modification projects where SCDES performs a technical review, see Section I of the instructions and Form B. Complete
the applicable sections of the NOI Form. Complete the Form B Checklist. Submit an original, signed NOI form, appropriate
fee schedule (C) with required fees, one (1) copy of SWPPP revisions, and one (1) copy of all other supporting
documentation, including necessary engineering calculations. No review clock is required for Modification reviews.
Authorizatio
n to discharge is granted based on the timeframes specified in the table below. For project sites located in the SCCZ, the
timeframes p
rovided below do not commence until a Coastal Zone Consistency determination has been issued for the site.
Review Type Allotted Review Time Frame
Regulated MS4 or entity implementing Regulation
72-300 7 business days of SCDES receipt of a complete NOI and fee payment.
SCDES (when construction site is subject to State
C-SWPPP reviews) 20 business days of SCDES receipt of a complete NOI and fee payment.
S. C. Coastal Zone (SCCZ) Requirements:
For projects that are located within ½ mile of a CRW and involve greater than 0.5 acres of land disturbance, a registered engineer,
landscape architect, or Tier B surveyor must prepare, amend when necessary, certify, and stamp the C-SWPPP as required and
allowed by the qualified individual’s respective act and regulations. Regulation 72-307(C)(5)(g) establishes additional requirements
for projects located in the SCCZ. The additional water quality measures are outlined in Chapter III, Section XIII of the South Carolina
Coastal Zone Management Program, as refined available at https://des.sc.gov/CZMP
DES 2617 (01/2025)
Page 88 of 229
Fee Schedules:
Make sure to answer all applicable questions on the appropriate Fee Schedule. Complete Fee Schedule A for Non-Coastal
projects; Schedule B for Coastal projects. Attach Form A, as required, for Transfer of Ownership. Attach Form B for major
modifications to a prior approved project with Fee Schedule C if SCDES reviews your modification.
Office Mechanics and Filing:
The original NOI form for projects located outside of MS4 areas and supporting documentation will be kept in the Central
Office files (hard copy or digitized copy) in accordance with the Retention Schedule.
Date: Enter today’s date.
Check if project is receiving SCIIP Funding: Check if project is receiving SCIIP funding and add grant number from RIA.
Project/Site Name: The Project/ Site Name should be a unique or distinguishing name (e.g., not Proposed Subdivision).
NOTE: SCDES must be notified in writing if the Project/ Site Name changes.
County: If the project is in multiple counties, list the county in which the majority of the site is located. If part of the project is
in the SCCZ, then list the coastal county in which the majority of the site is located and submit the project to CSWP; see the
“Where to File” section. List the other counties in which the site is located in the C-SWPPP.
Prior Approved NPDES Permit Number (Major Modification or Change of Information Only): Provide the NPDES
permit number (SCR number)or File Number previously assigned to the project or LCP.
Expedited Review Program (ERP): For additional information about ERP, see the ERP website https://des.sc.gov/
environment/water/swater/expeditedReview.htm. SCDES will notify the Project Owner/
Operator if the project is selected for review in the ERP. There are additional required fees for participation in this
program; these ERP fees should not be submitted until SCDES has notified the Project Owner/ Operator that the
project was selected for participation in the ERP. In the SCCZ, please note that projects impacting Geographic
Areas of Particular Concern (GAPCs) and/or wetlands may not eligible for participation. Consult BCM staff.
I. Notice of Intent (NOI) Application Type(s) ( See Section 2.4 of CGP for submission deadlines and notification
requirements)
A. Project (Application) Type I Select ALL applicable application types that best describe your project or
application. Section 2 of the Construction General Permit (CGP) may be reviewed for further information on
each type of application listed in this section. As an example, if your project is one that is a new startup, then
“New Project” should be selected. If your project is a new startup that will be located in Beaufort County,
that will also be expedited, then “New Project”, “OCRM Project Review”, and “Expedited Review Program”
should each be selected to describe your application. To determine if the project design is considered to be
above regulatory requirements or Low Impact Development, see the “Expedited Review Standard Operating
Procedures” document. If none of the application types listed in this section apply or clearly define the intent
of your project, select “Other” and provide specific details that clearly describe the intent of your NOI
application.
NOTE: SCDES must be notified in writing within fourteen (14) business days of a new Owner (person,
lending institution, government institution, etc.) taking title to or ownership of a prior approved
ongoing NPDES construction project/site. A new Property Owner must complete all applicable sections of
Form A (Transfer of Ownership) and submit this form to the Department or respective MS4 with the NOI
application. Written notification is also required when the Owner or Developer’s company name changes
for a prior approved construction permit.
NOTE: Major Modifications allowed by the Department are listed in Section 3.1.7 of the CGP. If your project is
a major modification, complete Form B, Fee Schedule C, and applicable sections of the NOI per directions
identified on Form B. Please note that Section V (Waterbody Information) of the prior approved NOI must be
reviewed for changes prior to submitting any modification request to the Department. If changes have
occurred, identify as Change of Information on the NOI form and provide the revised information in this
section. Attach a detailed Narrative and revised C-SWPPP documents to the major modification request.
A. MS4 Reviewer and MS4 Operator I If this project is located inside a Municipal Separate Storm Sewer System
(MS4) and must be reviewed and approved by a MS4 entity prior to submission to SCDES, then select “MS4
Project Review” as application type in Item A and provide the names of the entities that will perform the review
and the MS4 Operator. Urbanized area boundary maps are available at
http://cfpub.epa.gov/npdes/stormwater/urbanmapresult.cfm?state=SC. See the following website for
information about MS4s: https://des.sc.gov/MS4s. Note: Some MS4s have increased their review jurisdiction
boundaries beyond the original urbanized area map. Please confirm with the appropriate MS4 regarding review
jurisdiction.
II. Primary Permittee Information
Identify whether the Primary Permittee is a person or a company. If a company, identify if it is a lending
institution or government entity. Provide the Employer Identification Number (EIN) as established by the U.S.
Internal Revenue Service for the company. The EIN is commonly referred to as the taxpayer ID. If the company
doe
s not have an EIN (e.g., single member LLC, sole proprietorship). DO NOT list a Social Security number
DES 2617 (01/2025)
Page 89 of 229
A. Primary Permittee Name - Provide the complete, legal name of the person or entity (company) that will be the
Primary Permittee (Owner/Operator, O/O) for the project. If a person, provide the Title or Position. If a
company, provide the complete, legal name of the company. Do not list the D/B/A (Doing Business As) name.
NOTE: If
S.C. Department of Transportation (SCDOT) is the O/O , this NOI form (Form 2617) should NOT be used.
Provide the complete mailing address of the person/company identified in II.A as the Primary Permittee.
B. Contact/ODSA Name – Complete if different from II. A or O/O is a company. Provide the complete legal name
of the person identified as the Contact or Operator of Daily Site Activities (ODSA) for the project. This can be
someone other than the person that has signatory authority for the company. Often the Contact person is also
referred to as the ODSA. Provide the complete mailing address for the person, other than the permittee, the
Department may contact. This address can be different from the mailing address entered for the O/O.
C. Property Owner Name – If different from II.A or B, list the complete, legal name of the current Property Owner(s)
of the site. Enter the complete mailing address for the Property Owner. NPDES coverage will be issued to the
Primary Permittee identified in Section II.A, not the Property Owner, unless same entity. If there are multiple
Property Owners, attach additional sheets with all information requested in Section II.C.
III. Comprehensive Stormwater Pollution Prevention Plan (CISWPPP) Preparer Information
A. CISWPPP Preparer Name – Provide the name of the C-SWPPP Preparer for this project.
B. Registered Professional – Identif
y whether the C-SWPPP Preparer is a Registered South Carolina Professional
Engineer, Tier B Surveyor, or Landscape Architect. For projects disturbing more than 2 acres, the C-SWPPP
preparer must be one of the listed professionals or federal government employee as described in Title 40,
Chapter 22,and as required and allowed by the qualified individual’s respective act and regulations. In the
SCCZ, proje
cts that are located within ½ mile of a CRW and that involve greater than 0.5 acres of land
disturbance, the C-SWPPP preparer must be one of the listed professionals or federal government employee
as described in Title 40, Chapter 22, and as required and allowed by the qualified individual’s respective act
and regulations.
C. Company/Firm Name I Provide th
e complete, legal name of the company and S.C. Certificate of Authorization
(S.C. COA number). Enter the complete mailing address. SCDES may contact the C-SWPPP Preparer via
email. See the following websites for information about COA requirements for Landscape Architecture firms
http://www.dnr.sc.gov/land/LandscArch/LAlicense.html and Engineering and Surveying firms
http://www.llr.state.sc.us/POL/Engineers/. Enter N/A for S.C. COA if the firm is not required to have a COA.
IV. Project/Site Information
A. Type of
Construction Activity (ies) - Select A LL activity types that best describe the development proposed for the
site. “Ins
titutional” includes schools and other publicly owned projects, except linear projects. “Site Preparation”
includes clearing, grubbing, and grading only; no new impervious a reas should be proposed if this activity type is
selected. If none describe the development, then select “Other” and list the activity.
B. Site Address/Location I List the site address. If the site address is unknown, list the road name(s) on which the site is
located, the nearest intersection, or other detailed description of the site location. List a city/town only if the site is
within the city/ town limits. List zip code (if known). Provide the latitude/longitude and tax map numbers. See the
following website for assistance in obtaining latitude/ longitude coordinates:
http://www.epa.gov/tri/report/siting_tool/index.htm
. Latitude (from 32° to 35°) and longitude (-78° to -83°) should
be for the center of the site. Minutes (’) and seconds (”) should be from 0 to 59. Identify the lat/long data source.
C. Indian Lands – Identify if this site is located on Indian lands.
D. Proposed Start Date/Completion Date – Provide proposed project start and completion dates.
E. Disturbed Area/Total Area - Enter the disturbed area for the project and the total area for the site. The disturbed
areas must be rounded to the nearest tenth of an acre . For subdivisions, if the exact build-out is not known, the
disturbed area can be estimated using the following equation:
Disturbed area= 2(Maximum Footprint of House)(# of lots) + Road/ RightIofIWay areas + Other easements/
disturbance. NOTE: Provide written notification if the actual disturbed area exceeds the disturbed area on the approved NOI.
F. Modification Only: Change to Disturbed Area – If your mod
ification to a prior approved project will increase or
decrease the disturbed area, complete this section and see Section I of the Instructions. Enter the current
approved disturbed area and proposed increase (+) or decrease (-) to the disturbed area. If no change, enter
0.0. Enter the new total disturbed area (after change). Round each entry to the nearest tenth of an acre.
G. Larger Common Plan for Development or Sale (LCP ) - The plan in LCP is “broadly defined as any announcement
or piece of documentation (including a sign, public notice or hearing, sales pitch, advertisement, drawing, permit
application, zoning request, computer design, etc.) or physical demarcation (including boundary signs, lot stakes,
surveyor markings, etc.) indicating construction activities may occur on a specific plot.” [63 Federal Register No.
128, July 6, Page 6 1998, p. 36491] For example, if master calculations have been prepared and/ or submitted for
an entire site, then all phases and parcels at that site would be considered part of an LCP. If the site is part of a
subdivision, industrial park, commercial park, etc., then it is considered to be part of an LCP. List a unique,
distinguishing LCP/ Overall Development name. This name should not reference a specific phase. This LCP/
Overall Development name should also be listed on all NOIs for future projects that are part of this LCP, including
subsequent phases. Check the box if this is the first phase of the LCP. List the previous state permit/ file number
and previous NPDES coverage number if applicable. (DO NOT enter SCR1
00000). If not known, contact the
Department for assistance.
DES 2617 (01/2025)
Page 90 of 229
H. Flooding Problems – Identify whether flooding problems exist on the site, or downstream or adjacent to the site. If
yes, provide detailed explanation of the extent and impact in your C-SWPPP. NOTE: All C-SWPPP applications must
include a Floodway Map/FEMA Flood Insurance Map (See Checklist) with an outline of the project boundary on the map.
NOTE: The Department does not regulate the placement of fill in floodplains. Contact local city or county official.
I. Active SCDES Warning Notice/Notice to Comply/Notice of Violation – Select yes if SCDES has issued a Warning
Notice, Notice to Comply, or Notice of Violation for the site or any site within the LCP. Provide additional
information about the Notice (e.g., Order number) and a copy of correspondence with SCDES regarding the
Notice in your C-SWPPP.
J. State and Federal Environmental Permits or Approvals – List relevant state and federal permits applied for. See
§122.21(f) of S.C. Regulation 61-9 https://des.sc.gov/sites/des/files/Library/Regulations/R.30-9.pdf for a list of
permits, approvals, and programs that should be considered. If inaccurate, NPDES coverage may be invalid.
K. Waiver(s) - Identify any waivers requested for your project or construction site. Provide details and required
justifications in the C-SWPPP.
V. Waterbody Information
A. Receiving Waterbody(s) (RWB) Information
1. The Nearest receiving waterbody (RWB) is the nearest Waters of the State (WoS). See definition in §122.2 of
S.C. Regulation 61-9 - https://des.sc.gov/sites/des/files/Library/Regulations/R.30-9.pdf to which the
site’s stormwater discharges will drain. The nearest RWB must be listed in reference to a named waterbody,
if the RWB is unnamed. For example, if the site’s stormwater discharges drain to a stream on the site,
then the nearest RWB would be the stream. If the stream is not named, then determine the nearest named
waterbody (e.g., Grove Creek) into which the stream will flow and list the nearest RWB as a tributary to
the named waterbody (e.g., Tributary to Grove Creek). Then, the Next Nearest named RWB would be Grove
Creek. If the site’s stormwater discharges drain to multiple waterbodies, then list all such waterbodies;
attach additional sheets, if necessary.
2. Provide the distance, in feet to each receiving waterbody.
3. Provide the classification for each named waterbody. See S.C. Regulation 61-69
(https://des.sc.gov/sites/des/files/Library/Regulations/R.61-69.pdf) for a list of classifications of waterbodies
within S.C. If the nearest RWB is unnamed, then search the document for the nearest named RWB. If the
nearest, named RWB is not listed, then continue searching the document for the next, named waterbody,
proceeding downstream from the site. For example, a site in Anderson County drains to a tributary of
Hornbuckle Creek, then to Hornbuckle Creek, then to Middle Branch, and then to Brushy Creek/ Big Brushy
Creek. First, search the document for Hornbuckle Creek, then Middle Branch, then Brushy Creek. Because
there are 3 listings for Brushy Creek, the next, named waterbody (Saluda River) must be determined. Note
that the county for this record for Brushy Creek is listed as Pickens because the headwaters of Brushy Creek
are in Pickens County. The classification of the tributary to Hornbuckle Creek is “FW—Freshwaters”.
4. SCCZ Only: Provide the Coastal Receiving Water (CRW) to which the site’s stormwater discharges will drain.
This distance is used to determine permitting requirements. Coastal Receiving Water is defined as a receiving
water body as defined in the Policies and Procedures of the South Carolina Coastal Zone Management
Program, updated July 1995. This includes all regularly tidally influenced salt and fresh water marsh areas, all
lakes or ponds which are used primarily for public recreation or a public drinking water supply, and other
water bodies within the coastal zone, excluding wetlands, swamps, ditches and stormwater management
ponds which are not contiguous via an outfall or similar structure with a tidal water body.
5. Provide the distance, in feet to the CRW. Classification of RWB is not applicable for CRW.
B. Waters of
the U. S. /State Information (See Section 2.6.2 thru 2.6.6 of the CGP)
1. Complete
the “On the Site?” column for items a-d. If yes is selected for that column, then the next 3 columns
must be completed. If there are other waters of the U.S./ State (WoS) on the site not listed in items a and b
(e.g., stream, river, lake, pond), then list those in item c. Jurisdictional wetlands are under ACOE jurisdiction.
2. Delineation means identification by U.S. Army Corps of Engineers (USACOE) or wetlands consultant. Also, see
the checklist for information about delineation requirements. If there are WoS within 100’ of the disturbed
area that were not delineated/identified, then explain this in the narrative; this includes WoS that are not on
the project site but are within 100’ of the disturbed area. For Direct Critical Area in the SCCZ, delineation
means identification by BCM or wetlands consultant. BCM staff may require identification of Direct Critical
Area by BCM staff as part of its Coastal Zone Consistency review.
3. Impacts -
If construction activities will occur in and/ or will impact WoS, then select yes for “Impacts?”
4. Amount of Impacts - List the amount of impacts to WoS. Provide an additional, separate plan sheet that shows
all WoS on the site and the impacted areas. If there are proposed impacts to WoS, please contact USACOE
(866-329-8187) and SCDES Water Quality Certification, Standards & Wetlands Programs Section (803-898-4300)
to determine additional requirements before submitting this NOI. In the SCCZ
, also contact SCDES OCRM
Wetlands Section (843-953-0200). Please note that it is the Project Owner/ Operator’s responsibility to ensure
that all WoS are shown and identified in the CISWPPP. See Sections 2.6
6. If yes for impacts in B.3 , describe each impact and activity, and list all permits (e.g., U.S. Army Corps of
Engineers (USACOE) Nationwide Permit, SCDES General Permit) and certifications that have been applied for
or obtained for each impact. Describe the activity(s), whether the impact is permanent or temporary, and
any other relevant information. Provide a copy of all permits and certifications for and correspondence with
USACOE and SCDES for the impacts. Include all plats referenced in the permits or correspondence.
DES 2617 (01/2025)
Page 91 of 229
C. S. C. Navigable Waters (SCNW) Information
1. Are SCNW on the site? See https://des.sc.gov/NavigableWaters for the definition of SCNW and other
information related to SCNW. Or, contact SCDES Water Quality Certification, Standards &
Wetlands Programs
Section at (803) 898-4300 for assistance determining the navigability of the waters on your site or with
questions related to SCNW. If yes to C.1, list the name of
the SCNW. If the SCNW is not named, then
provide a description that references the nearest, named waterbody (e.g., tributary to Grove Creek). If no
to C.1, do not complete questions C.2 thru C.3 of this section.
2. If yes to C.1 and construction activities proposed by your project will cross over or occur in, under, or thru the
SCNW, describe SCNW activities (e.g., road crossing, sub-aqueous utility line, temporary or permanent
structures, etc.). This includes temporary and permanent crossings with roads, utility lines, etc.
3. Identify permits providing SCNW Activity(ies) coverages for your site.
a. Identify USACOE 404 Permit or 401 Certification issued for the site. Identify permit number(s)
or
certification(s) and corresponding activities covered under each.
b. If applicable, identify the date the SCNW permit was applied for. Identify whether the permit applied for
will cover ALL
activities listed in C.2 of some activities listed in C.2. List covered activities.
c. If a SCNW permit
has NOT already been applied for or issued for all of the activities in SCNW for this site,
then those activities and conditions can be addressed during the review of the C-SWPPP, and a separate
State Navigable Waters permit is not required. Provide an additional plan sheet with plan and profile
views (drawn to scale) of SCNW and associated activities; include activities description on the plan sheet.
1. 303(d) Listed Impaired Waterbodies
NOTE: The TMDL, 303(d), and Non-Point Source water quality tool is a mapping system showing detailed information on
WQMS locations, water quality status, and much more. The tool is available at the following website along with instructions
for using the tool: https://des.sc.gov/TMDL.
In the SCCZ, list the nearest upstream and downstream SCDES WQMS(s) and corresponding waterbody(ies).
Additionally, shellfish stations only monitor for Fecal coliform bacteria. Include both the nearest shellfish
monitoring station(s) and full WQMS(s) on the NOI for both upstream and downstream locations when shellfish
monitoring stations are present. If a shellfish monitoring site is not present then you only need to list
the full WQMS(s). When a shellfish monitoring station is present, everything but Fecal coliform bacteria needs
to be assessed at the full WQMS(s). Shellfish monitoring stations begin with numbers and full WQMS(s) begin
with letters.
a. List the nearest SCDHEC Water Quality Monitoring Station(s) to which the site’s construction stormwater
dischar