AGENDA 08.22.2025 PAGE 1
A TRANSPORTATION SALES TAX ADVISORY
COMMITTEE MEETING WILL BE
CONDUCTED AT THE CITY OF HARDEEVILLE
IN COUNCIL CHAMBERS.
Watch Live via YouTube at:
http://www.youtube.com/@jcmedia6537
I
nstructions may also be found at the Jasper County website
www.jaspercountysc.gov
FOR MORE INFORMATION, PLEASE CALL (843) 717-3696
AGENDA 08.22.2025 PAGE 2
1
0:00AM
JASPER COUNTY
2024 Transportation Sales Tax Advisory
Committee Meeting
City of Hardeeville – Council Chambers
205 Main Street Hardeeville, SC 29927
Friday, August 22, 2025
AGENDA
• C
all to Order
• Chairman John Kemp – Welcome and Comments
• James Iwanicki – Program Manager Update
• Discussion of Collections and Financing
• General Discussion
• Set Date and Time for Next Meeting
• Adjourn
In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended,
notification of the meeting was posted on the County Council Building at a publicly accessible
place and on the county website at least 24 hours prior to the meeting. A copy of the agenda was
given to the local news media and posted at the meeting location twenty-four hours prior to the
meeting.
Special Accommodations Available Upon Request to Individuals with Disabilities, please contact
the Jasper County ADA & Civil Rights Coordinator, Tisha Williams by telephone at (843) 717-3690
or via email at jcadministrator@jaspercountysc.gov no later than 48 hours prior to the scheduled
meeting.
Page 1 of 2
August 18, 2025
MEMO:
TO: Andrew Fulghum, County Administrator
1% Sales Tax Advisory Committee
FROM: Jim Iwanicki
RE: Jasper County Update 1% Sales Tax Update (Roadway)
August 18, 2025, Update:
Jasper County advertised a Request for Qualifications (RFQ) on March 17, 2025, with a due date
of March 17, 2025, for a Program Manager for the Transportation Sales Tax Program . Four
RFQs were received. The R FQs were scored by a committee consisting of The City of
Hardeeville, The Town of Ridgeland, The Jasper County School System, and Kim Burgess,
Jasper County’s Director of Administrative Services. Jim Iwanicki recused himself from the
scoring because of his working relationships with some of the proposers. The team
recommended Infrastructure Consulting & Engineering, LLC ( Consultant) as the most qualified
proposer. This information was shared with the Transportation Sales Tax Advisory Committee,
and they supported the selection of the Consultant as the most qualified proposer.
Kim Burgess, David Tedder and Jim Iwanicki met with the Consultant and negotiated the
attached contract. The c ontract reflects the items of work described in the RFQ and additional
items identified and agreed upon by both parties that should be included to provide the required
Program Management.
The Consultant’s compensation will be on an hourly fee basis, and a lump sum for the early -
known deliverables, as described in Exhibits D and E of the Contract. The hourly rate schedule
and fee proposal has a not -to-exceed limit of e ight million nine hundred e ighty-five thousand
dollars ($8,985,000.00). Individual Task Orders may be executed as part of this contract for
specified projects and tasks, in which the Consultant shall be compensated in accordance with
mutually agreed upon Task Orders for which the specific scope, schedule and fee for each job
order will be individually negotiated. The f ee represents about 2.4% of the $376 million
program during the first 5 years. The total not to exceed fee for the first five years if pro- rated to
remain constant over 15 years would be 7.1% of the Transporta tion Program. As laid out in the
RFQ the first few years will require more administrative effort to get the program activated and it
Jasper County Engineering Services
P.O. BOX 1244 ▪ Ridgeland, South Carolina 29936
Phone (843) 726-7740 ▪ FAX (843) 726-7743
James M Iwanicki, P.E.
Director of Engineering Services
JIwanicki@jaspercountysc.gov
JMI
Page 2 of 2
is expected that the fees for the years beyond year 5 will be a lessor percentage of the program
thus bringing the overall program management fee closer to 6% over the 15 years . As a
comparison, similar scoped program management fees in other counties were Richland County
6.5%, Horry County 5.5%, and York County 5.0%.
Recommendation: Staff recommends that the Transportation Sales Tax Advisory Committee
support and recommend the following to County Council:
Approve the contract with Infrastructure Consulting & Engineering, LLC for the
Program Management of the Transportation Sales Tax Program for a not -to-exceed
limit of e ight million n ine hundred e ighty-five thousand dollars ($8,985,000.00).
Individual Task Orders may also be executed as part of this contract for specified
projects and tasks, in which the Consultant shall be compensated in accordance with
mutually agreed upon Task Orders for which the specific scope, schedule and fee for
each job order will be individually negotiated.
Attachments:
Contract
Contract Exhibits*
Consultants Letter Dated August 5, 2025, to Jim Iwanicki
*Notes: Exhibit B-1 Original RFQ
Exhibit B-2 Consultants Proposal
1 of 9
AGREEMENT FOR PROFESSIONAL SERVICES
BETWEEN
Jasper County, South Carolina
AND
Infrastructure Consulting & Engineering, LLC
THIS CONTRACT IS SUBJECT TO ARBITRATION PURSUANT TO S.C. CODE ANN. §15-48-10
This AGREEMENT is made and entered into this _____ day of _____________, 2025, by Infrastructure
Consulting & Engineering, LLC located at 110 Midlands Court, West Columbia, SC 29169, (CONSULTANT),
and Jasper County located at 358 Third Avenue, Ridgeland, SC 29936, (COUNTY).
WHEREAS, CONSULTANT represents that the work to be performed is within its particular area of expertise, is
qualified to perform such services , and shall be fully responsible for means and methods used in performing its
work (WORK). COUNTY relies upon such representations.
NOW THEREFORE , for good and valuable consideration, the receipt and sufficiency of which is hereby
acknowledged, the parties hereto agree as follows:
ARTICLE I - GENERAL PROVISIONS
1.1. Scope. CONSULTANT will provide WORK as described in Exhibit A, “Scope of Services,” (SCOPE)
to be negotiated and mutually agreed upon by both parties and made a part of this AGREEMENT. WORK
described under the SCOPE shall be completed by CONSULTANT as directed by COUNTY.
1.2. Independent Contractor. Nothing in this AGREEMENT creates a relationship between COUNTY or its
affiliates and CONSULTANT, except that of an independent contractor.
1.3. Ownership of Documents.
1.3.1. CONSULTANT agrees that all reports, drawings, studies, specifications, estimates, maps,
computations, test results, and other data (DOCUMENTS) prepared by or for CONSULTANT
under this AGREEMENT are “work for hire” and shall be delivered to, become, and remain the
property of COUNTY upon completion of, and payment for, the WORK.
1.3.2. COUNTY agrees that CONSULTANT shall have the right to retain one or more copies of
DOCUMENTS. COUNTY shall have the right to use DOCUMENTS without restriction ,
limitation, or additional compensation to CONSULTANT.
1.3.3. CONSULTANT shall not incur any liability for use or re -use of its DOCUMENTS on an
extension of this project or on another project where such use or re -use is without
CONSULTANT’S written consent.
1.4. Electronic Data.
1.4.1. The parties recognize that drawings, specifications, three-dimensional modeling (such as CAD
drawings, MS Office files, and Building Information Models), and other DOCUMENTS may be
transmitted among COUNTY, CONSULTANT, and others by electronic media as an alternative
to paper hard copies (collectively “Electronic Data”).
2 of 9
1.4.2. The transmitting party specifically disclaims all warranties, expressed or implied, including, but
not limited to, implied warranties of merchantability and fitness for a particular purpose. However,
transmission of Electronic Data shall not invalidate or negate any duties pursuant to the applicable
standard of care with respect to the creation of Electronic Data unless such data is materially
changed or altered after it is transmitted, and the transmitting party did not participate in such
change or alteration.
1.4.3. CONSULTANT acknowledges that differences may exist between Electronic Data and hard-copy
DOCUMENTS. In the event of a conflict between hard-copy DOCUMENTS and Electronic Data,
signed or sealed hard-copy DOCUMENTS shall govern.
1.4.4. CONSULTANT agrees to indemnify and hold COUNTY harmless for all claims arising from the
use of Electronic Data by CONSULTANT or any third party authorized by CONSULTANT.
1.5. CONSULTANT shall comply with the terms contained in Exhibit F: Mandatory Federal Provisions if the
project involves Federal funds.
ARTICLE II - COUNTY
2.1. COUNTY shall designate a person to act with authority on COUNTY's behalf and respond in a timely
manner to submissions by CONSULTANT.
2.2. COUNTY shall furnish information or services required by this AGREEMENT with reasonable
promptness. COUNTY shall also furnish any other information or services under the COUNTY’s control
and relevant to the CONSULTANT ’s performance of the WORK with reasonable promptness after
receiving a written request for such information or services.
ARTICLE III - CONSULTANT
3.1. CONSULTANT shall be responsible for the professional quality, technical accuracy, timely completion,
and the coordination of all designs, drawings, specifications, reports, and other services furnished by
CONSULTANT under this AGREEMENT.
3.2. Taxes/Fees. CONSULTANT shall pay all taxes imposed by any federal, state, or local taxing authority
on: (a) all fees, costs and other compensation paid by COUNTY to CONSULTANT pursuant to this
AGREEMENT; and (b) all payroll and compensation sums paid by CONSULTANT to
CONSULTANT’s employees and (c) all other taxes, fees, and charges levied against CONSULTANT on
account of this AGREEMENT.
3.3. Qualification of CONSULTANT’s Personnel. Persons assigned by CONSULTANT to the WORK shall
be duly qualified, experienced, and have a thorough knowledge of federal, state, and local regulations and
policies regarding their respective disciplines. CONSULTANT shall not replace any member of
CONSULTANT’s team designated in the SCOPE that remains in CONSULTANT’s employ without the
approval of COUNTY, which approval by COUNTY shall not be unreasonably withheld.
CONSULTANT shall notify COUNTY immediately in writing if a member of CONSULTANT’s team
designated in the SCOPE leaves CONSULTANT’s employ. The CONSULTANT shall replace any
member of CONSULTANT’s team designated in the SCOPE to which COUNTY reasonably objects.
3 of 9
3.4. CONSULTANT represents that (a) WORK will be performed in a manner consistent with the care and
skill ordinarily exercised by other professionals practicing in the same locality and providing similar
services on projects of similar size, complexity and conditions; and (b) in conformance with the SCOPE
and all work orders.
3.5. Time for Performance.
3.5.1. Time limits stated in the SCOPE and Exhibit C, “Program Schedule”, are of the essence to the
AGREEMENT.
3.5.2. CONSULTANT shall provide a status report to COUNTY on a regular basis or with each invoice
submittal detailing the progress of the WORK , including whether ( a) the WORK is proceeding
according to the time limits stated in the SCOPE; and (b) items exist which require resolution so
as not to jeopardize CONSULTANT’s ability to meet SCOPE time limits.
3.5.3. CONSULTANT will provide deliverables continuously and diligently, providing sufficient
personnel, material, and equipment to meet project schedules and milestones, including the use of
overtime if appropriate . CONSULTANT shall be responsible for all damages incurred by
COUNTY due to delays caused by CONSULTANT.
3.6. Audit:/Access to Records.
3.6.1. CONSULTANT shall maintain books, records, logs, and other documents pertinent to the WORK
in accordance with generally accepted accounting principles and industry practices. COUNTY,
other applicable agencies, or any of their duly appointed representatives shall have access to any
of this information for the purposes of examination, audit, excerpts, and transcriptions.
3.6.2. Records described above shall be maintained and made available during the performance under this
AGREEMENT and for a period of three years after COUNTY makes final payment with all other
pending matters closed.
3.7. Indemnification.
3.7.1. CONSULTANT shall indemnify and hold harmless COUNTY, their officers and employees, from
liability of any nature or kind, including costs and expenses (including but not limited to reasonable
attorney’s fees), for liability for damages resulting, in whole or in part, from negligent acts, errors,
omissions, or misconduct of CONSULTANT or any person or organization for whom
CONSULTANT may be responsible including, but not limited to, CONSULTANT ’s
subcontractors.
3.7.2. Approval by COUNTY or other agencies of drawings, designs, specifications, reports, and
incidental engineering work or materials furnished hereunder shall not in any way relieve
CONSULTANT of responsibility for its WORK . CONSULTANT shall remain liable for all
errors and omissions regardless of any approvals by COUNTY.
3.7.3. The rights provided herein are nonexclusive and are in addition to any rights the parties may have
at law or equity.
3.8. CONSULTANT agrees to perform all WORK in compliance with all applicable laws.
4 of 9
ARTICLE IV – CHANGES TO THE WORK
4.1. Change Order : A document signed by COUNTY authorizing an addition, deletion, or revision in the
WORK or an adjustment in the SCOPE price or time limits, or other revision to the AGREEMENT ,
issued on or after the Effective Date of the AGREEMENT.
4.2. CONSULTANT recognizes and acknowledges that, notwithstanding any provision to the contrary in this
contract, CONSULTANT shall not be paid for any Change Order WORK not duly authorized by the
COUNTY.
ARTICLE V – PAYMENTS AND COMPLETION
5.1. COUNTY shall pay CONSULTANT for WORK as follows:
Fee:
CONSULTANT’s compensation will be on an hourly fee basis, and a lump sum for the early known
deliverables, as described in Exhibits D and E, the hourly rate schedule and Fee Proposal, with a total
not-to-exceed limit of Eight million, Nine hundred and Eighty- Five thousand dollars and 00/100
($8,985,000.00). Individual Task Orders may be executed under this contract for specified projects
and tasks, in which the CONSULTANT shall be compensated in accordance with mutually agreed
upon Task Orders for which the specific scope, schedule and fee for each job order will be individually
negotiated.
5.2. Invoices must be submitted to COUNTY by the 25th of each month to be included in that month’s invoice
to COUNTY. CONSULTANT agrees that COUNTY shall not be obligated to pay CONSULTANT for
WORK covered by a ny invoice if CONSULTANT submits the invoice more than one hundred eighty
(180) days after the date CONSULTANT renders the services, or more than ninety (90) days after this
AGREEMENT terminates, whichever is earlier. Payment for services will be remitted to CONSULTANT
within thirty (30) days after COUNTY’s receipt of CONSULTANT’s invoice.
ARTICLE VI – PROTECTION OF PERSONS AND PROPERTY
6.1. CONSULTANT agrees that it will be solely and continuously responsible for all of its activities and those
of its employees or agents on the site where the WORK will be performed with respect to safety.
6.2. CONSULTANT will provide, at its own expense, all personal protective clothing and equipment required
for its employees to perform their work in a safe manner and in compliance with all applicable COUNTY
-specific and occupational health and safety standards.
6.3. CONSULTANT agrees that COUNTY may take whatever actions deemed necessary in its sole discretion
to mitigate any damage to persons and/or property in an emergency situation related to the project or this
AGREEMENT. To the extent CONSULTANT has caused or contributed to such situation,
CONSULTANT agrees to indemnify COUNTY for all costs incurred.
ARTICLE VII – INSURANCE
7.1. CONSULTANT shall, during the performance of this AGREEMENT and for an one-year period
thereafter, secure and maintain the following insurance at its own expense:
1. Errors and Omissions - Professional Liability
5 of 9
$1,000,000 per Claim and Aggregate
$100,000 or less Deductible
2. General Liability - to include coverage for premises, operations, independent contractors, blanket
contractual liability, products completed operations, and personal injury.
$1,000,000 Each Occurrence
$2,000,000 Aggregate
3. Automobile Liability – Any Auto Owned, Non-owned, and Hired
$1,000,000 Limit
4. Excess Liability
$1,000,000 Occurrence Form
$1,000,000 Aggregate
5. Workers Compensation - Statutory
Employers Liability
$500,000 Each Accident
$500,000 Policy Limit
$500,000 Each Employee
7.2. Add COUNTY as additional insured for ongoing and completed operations for General Liability,
Automobile Liability and Excess Liability (Umbrella).
7.3. For all of the above, furnish certificates prior to commencement of work. The certificate holder (and
additional insured) should read as follows:
Jasper County
Attention: Finance Department
358 Third Avenue
Ridgeland, SC 29936
7.4. The Certificate of Insurance shall expressly state that if there is any material change in coverage
(cancellation, expiration, or exclusion of a specifically required coverage such as completed operations)
that the certificate holder, Jasper County, will receive at least 30 days’ prior written notice by either a
reliable carrier such as FedEx, UPS and alike or by USPS mail using the service of “Return Receipt
Requested”.
7.5. The insurance companies providing coverage must be rated “ A-” or better by A. M. Best ’s most recent
edition and be admitted and licensed in the CONSULTANT’s state of domicile. Any exceptions to these
requirements must be referred to the COUNTY for prior approval.
7.6. To the maximum extent permitted by law, all insurance policies with the exception of Errors and Omissions
maintained hereunder shall provide a waiver of subrogation in favor of COUNTY.
6 of 9
7.7. The foregoing requirements are not intended to limit or qualify the liabilities and obligations assumed by
CONSULTANT under this AGREEMENT.
ARTICLE VIII – TERMINATION OR SUSPENSION
8.1. Termination.
8.1.1. This AGREEMENT may be terminated by COUNTY at any time for the convenience of the
COUNTY by written notice to the CONSULTANT specifying the termination date .
CONSULTANT shall be paid for WORK completed through the termination date.
8.1.2. COUNTY shall give written notice if CONSULTANT fails to perform its WORK in accordance
with the appropriate standard of care, fails to provide WORK in accordance with required
schedule, becomes insolvent or files for any form of bankruptcy protection, or is in breach of any
material obligations under this AGREEMENT . CONSULTANT must cure any such default
within seven (7) days of notice.
8.1.3. If CONSULTANT does not cure the default within the seven (7) days, then COUNTY may
terminate this AGREEMENT for cause and may take over the WORK and prosecute same to
completion by contract or otherwise, deduct such costs for completion from payments paid or
payable to CONSULTANT, and recover from CONSULTANT any shortfall.
8.1.4. If COUNTY should terminate CONSULTANT for cause, and it should thereafter appear by
adjudication or otherwise that such a termination was improper, the termination for default will be
converted to a termination for the convenience of COUNTY and payment will be made
accordingly. In no event shall COUNTY be obligated to compensate CONSULTANT for any
termination expenses or damages.
8.1.5. Any contract entered into by the COUNTY shall be subject to cancellation without damages or
further obligation when funds are not appropriated or otherwise made available to support
continuation of performance in a subsequent fiscal period or appropriated year.
8.2. Suspension. COUNTY may, without cause, order CONSULTANT in writing to suspend, delay or
interrupt the WORK, in whole or in part for such period of time as COUNTY may determine. The WORK
fees and time may be adjusted for increases in the cost and time caused by suspension, delay, or interruption.
ARTICLE IX – CLAIMS AND DISPUTES
9.1. The parties agree to attempt to resolve all claims or disputes arising from or related to this AGREEMENT
at a meeting between the senior representatives of each party within five (5) business days of receipt by
either party of a notice and description of the dispute.
9.2. If the dispute is not settled under clause 9.1, the parties shall agree to mediate the dispute in compliance
with the SC Alternative Dispute Resolution (ADR) rules. The parties shall mutually agree upon the
selection of a mediator and bear the costs of the mediation equally.
9.3. Unless provided to the contrary herein CONSULTANT shall continue to perform the WORK and
COUNTY shall continue to pay undisputed amounts to CONSULTANT, pending the final resolution of
7 of 9
any dispute or disagreement between COUNTY and CONSULTANT.
9.4. Neither party shall be liable to the other for any special, indirect, punitive, consequential damages including
but not limited to loss of profits, loss of use, loss of revenue, loss of capital, loss of goodwill, or any other
incidental or consequential damages arising out of the WORK.
9.5. This AGREEMENT is governed by the laws of the state of South Carolina. The venue for any ADR or
litigation shall be Jasper County.
ARTICLE X – MISCELLANEOUS PROVISIONS
10.1. Assignment: CONSULTANT acknowledges that its services are unique and personal; therefore, its rights
under this AGREEMENT may not be assigned or its duties or obligations delegated without the express
written consent of COUNTY, which consent shall not be unreasonably withheld.
10.2. Amendment: This AGREEMENT may not be changed, altered, or amended in any way except in writing
signed by a duly authorized representative of each party.
10.3. Severability: I f any provision or portion of a provision of this AGREEMENT is declared void or
unenforceable, or limited in its application or effect, all other provisions and unaffected portions thereof
shall remain fully enforceable; and the parties shall use their best efforts to negotiate a valid and enforceable
modification to this AGREEMENT to address any matters affected.
10.4. Headings: The headings of the Exhibits, Sections, Schedules, and Attachments contained in this
AGREEMENT are for convenience only and shall not expand, limit, or change the provisions thereof.
10.5. Interpretation - This AGREEMENT shall be interpreted under and governed by the laws of the state in
which the project is located.
10.6. Waiver - The failure of the parties to this AGREEMENT to enforce the provisions of this AGREEMENT,
or to exercise any option provided herein, shall not be construed to be a waiver of such provisions nor in
any way to affect the validity of this AGREEMENT or any part thereof n or the right of the parties to
enforce each and every provision thereafter.
10.7. Publication, Publicity and Confidentiality - Articles, papers, bulletins, reports, or other materials reporting
the plans, progress, analyses, or results and findings of the work conducted under this AGREEMENT shall
not be presented publicly nor published without prior approval in writing from COUNTY. Additionally,
representatives of the CONSULTANT are expressly prohibited from releasing any information to the
media or any other person about any matter pertaining to this AGREEMENT. Such information is to come
from COUNTY. CONSULTANT acknowledges that COUNTY is a political subdivision of the State of
South Carolina, and is subject to the South Carolina Freedom of Information Act, S.C. Code 30-4-10 et seq.
10.8. Drug Free Workplace - In accordance with the Drug-Free Workplace Act of 1988, as amended, and as a
condition precedent to the execution of this AGREEMENT , the undersigned certifies that
CONSULTANT will maintain a drug-free workplace.
10.9. Entire Agreement : This AGREEMENT, together with the attached Exhibits constitutes the entire
agreement between COUNTY and CONSULTANT and supersedes all prior written or oral
understandings.
10.10. Force Majeure: Neither Party shall be liable for any failure or delay in performance under this
8 of 9
AGREEMENT caused by events beyond the impacted party ’s reasonable control ; including, without
limitation: (a) acts of God; (b) flood, fire, earthquake, or explosion; (c) war, terrorist acts, riot or other civil
unrest; (d) government order, law, or actions; (e) embargoes or blockades; (f) national or regional
emergency; (g) strikes, labor stoppages, or other industrial disturbances; and (h) epidemics or pandemics.
The impacted Party shall promptly give notice of the force majeure event to the other Party and shall use
diligent efforts to ensure the effects are minimized. The Impacted Party shall resume the performance of its
obligations as soon as reasonably practicable after the removal of the cause.
(SIGNATURE PAGE BELOW)
9 of 9
IN WITNESS WHEREOF, the parties hereto have made and executed this AGREEMENT as of the date
first above written. The signatories attest that each holds the requisite authority to bind their respective parties.
Jasper County, South Carolina
BY:
NAME:
TITLE:
Infrastructure Consulting & Engineering, LLC
BY:
NAME:
TITLE:
Exhibits:
Exhibit A: Scope of Services
Exhibit B-1: Request For Qualifications
Exhibit B-2: ICE Statement Of Qualifications
Exhibit C: Program Schedule
Exhibit D: Fee Proposal
Exhibit E: Hourly Rates
Exhibit F: Mandatory Federal Provisions (if working on federally funded projects)
EXHIBIT A
SCOPE OF SERVICES
For Program Management
Jasper County Transporta�on Sales Tax Program
PURPOSE and BACKGROUND
Jasper County voters passed a transporta�on sales tax referendum in November 2024. The County is
contrac�ng with Infrastructure Consul�ng and Engineering to provide program and financial management,
project management, project planning, scoping, conceptual design, u�lity coordina�on, preliminary right-
of-way coordina�on, and construc�on administra�on for the Transporta�on Projects and for civil site
improvements associated with the Greenbelt Ini�a�ves iden�fied in the referendum. The Sales Tax
Program is described in Exhibit B-1, the Request for Qualifica�ons. The Statement of Qualifica�ons as
submited by Infrastructure Consul�ng and Engineering on April 30, 2025 is atached as Exhibit B -2. This
was the basis for selec�on and outlines the qualifica�ons, personnel and work approach as Program
Manager. The following condi�ons apply to program management consul�ng firm:
• Infrastructure Consul�ng and Engineering is excluded from working as the design engineer for any
specific project design contract awarded through the sales tax program.
• Infrastructure Consul�ng and Engineering is eligible to perform construc�on management and CEI
services for projects under the sales tax program.
Infrastructure Consul�ng & Engineering (CONSULTANT) has been selected to provide Program
Management Services to Jasper County (COUNTY) in support of the 2024 Transporta�on Sales Tax Program.
The following shall serve as the ini�al scope of services to support the County in managing the Program
and may be amended as mutually agreed upon by both par�es.
PROJECTS
The CONSULTANT shall provide the following services to aid Jasper County with the management and
implementa�on of the following 16 approved projects:
1. S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane widening with mul�-
use paths on both sides for approximately 3.8 miles and would be coordinated with the SC 170
Widening and Access Management project ($57,000,000).
2. US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd) : 6- lane road widening for
approximate 1 mile ($15,000,000).
3. US 278 Corridor Phase 2 (Argent Blvd to I-95): 6-lane road widening for approximately 4.75 miles
(with two bridges, approx. 360 LF and 90 LF) ($50,000,000).
4. SC 46/SC 170/SC 315 Intersec�on Improvements and Widening : assume 1 mile widening with
i n t e r s e c � o n i m p r o v e m e n t s a t S C 4 6 a n d S C 1 7 0 t o p o t e n � a l l y c o m b i n e i n t o 1 i n t e r s e c � o n
($30,000,000).
5. US 17/US 321 Intersec�on Improvement : skewed intersec�on in Hardeeville and may contain
complicated right of way acquisi�on, assumes exis�ng bridge over railroad can remain
($4,000,000).
6. US 17 Widening (SC 315 to SC 170) : 4- lane divided widening for approximately 2 miles
($24,000,000).
7. S C 3 1 5 W i d e n i n g f r o m S C 1 7 0 / S C 4 6 i n t e r s e c � o n t o U S 1 7: 4 -lane/5-lane widening for
approximately 6 miles ($41,500,000).
8. SC 336 Intersec�on Improvements (Grahamville Rd to SC 336) : poten�al realignment of SC 336
for approximately 0.3 mile and poten�al for complicated R/W acquisi�on: ($5,000,000).
9. I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road Improvements: Upgraded
interchange included with SCDOT I-95 project from MM 8 to MM 21. Project would include road
improvements to US 17, Bees Creek Road, and Glover Road ($12,000,000).
10. I-95 Exit 22 Connector (US 278 to Bees Creek Road) : new road with poten�al new bridge over I -
95, dependent upon alignment and SCDOT’s improvements for Exit 22 for approximate 3 miles:
($36,000,000).
11. Glover Road (Bees Creek Road (S-13) to SC 462): Dirt road and paved road improvement – assume
2 lanes with R/W purchase for future widening ($26,000,000).
12. US 278/SC 652 (Calf Pen Bay Road) Intersec�on Improvement : A tradi�onal intersec�on
improvement on US 278 has been installed with le� turn lane and right turn onto SC 652, but
improvements were not incorporated on SC 652. Turn lanes with improved intersec�on
realignment should be considered or a roundabout s hould be installed as this could be a key
intersec�on for traffic calming for entrance to Ridgeland: ($2,000,000).
13. SC 462 (SC 170 to Snake Road): 4-lane divided or 5-lane widening for approximately 3 miles and
safety improvements for approximately 5 miles ($56,000,000).
14. US 17/Mackay Point Road Intersec�on: Realignment of S-27-37 to eliminate skewed intersec�on
with Mackay Point Road and may involve improved access management on US 17, dependent on
coordina�on with SCDOT , assume 0.6 -mile realignment and intersec�on improvement:
($5,000,000).
15. US 321/SC 336 Intersec�on Improvement: skewed intersec�on in Tillman ($2,500,000).
16. Reconstruc�on of Levy Road: ($10,000,000).
Greenbelt Ini�a�ves : $94,000,000 for financing greenbelt ini�a�ves (including but not limited to,
purchasing property for conserva�on, purchasing conserva�on easements, crea�ng passive greenspace,
crea�ng ac�ve greenspace, protec�ng natural resources, protec�ng agricul tural or heritage landscapes,
and protec�ng scenic corridors).
Management of the Greenbelt Ini�a�ves is NOT part of the Consultant’s scope, except for the civil site
improvements associated with the Greenbelt Ini�a�ve projects.
Jasper County officials have determined the preliminary unofficial top roadway priori�es to be as follows:
1. S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane widening with mul�-
use paths on both sides for approximately 3.8 miles and would be coordinated with the SC 170
Widening and Access Management project ($57,000,000).
2. US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd) : 6- lane road widening for
approximate 1 mile ($15,000,000).
3. US 278 Corridor Phase 2 (Argent Blvd to I-95): 6-lane road widening for approximately 4.75 miles
with two bridges (approx. 360 LF and 90 LF) ($50,000,000).
4. I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road Improvements: Upgraded
interchange included with SCDOT I-95 project from MM 8 to MM 21. Project would include road
improvements to US 17, Bees Creek Road, and Glover Road ($12,000,000).
5. Reconstruc�on of Levy Road: ($10,000,000).
6. SC 336 Intersec�on Improvements (Grahamville Rd to SC 336) : poten�al realignment of SC 336
for approximately 0.3 mile and poten�al for complicated R/W acquisi�on: ($5,000,000).
SCOPE OF SERVICES
The CONSULTANT shall provide the following services to aid Jasper County with the management and
implementa�on of the
1. Task 1 – Project Management Services
a. Assist the County in obtaining Local Public Agency (LPA) status with South Carolina Department of
Transporta�on (SCDOT). Act as an extension of County staff and provide the needed services to
the County for compliance with SCDOT LPA procedures for projects involving state and/or federal
funds.
b. Coordinate, manage, and review project plans, technical reports, specifica�ons, and es�mates
prepared by project design consultants providing professional services to the County , for
consistency with contract budgets, schedules, scope of work, design criteria, and applicable
standards. This shall include civil site improvements associated with the Greenbelt Ini�a�ves.
c. Project cost es�mates will be reviewed, veted and updated annually to keep pace with market
trends.
d. Prepare independent cost es�mates for professional services for each project and assist the
County with scope, schedule, and fee nego�a�ons with project design consultants, also to include
the civil site improvements associated with the Greenbelt Ini�a�ves.
e. Review project design consultant invoices for accuracy, compliance with contract terms, and
progress of the work. This shall include civil site improvements associated with the Greenbelt
Ini�a�ves.
f. Conduct mee�ngs, monitor design progress, and keep the County informed of each project’s
status. This shall include civil site improvements associated with the Greenbelt Ini�a�ves.
g. Coordinate with municipali�es, environmental agencies, and other project stakeholders as
applicable to secure necessary approvals and permits prior to the construc�on le�ng. This shall
include civil site improvements associated with the Greenbelt Ini�a�ves.
h. Ensure that all necessary permits and environmental approvals are obtained prior to le�ng a
project for construc�on. This shall include civil site improvements associated with the Greenbelt
Ini�a�ves.
i. Ensure that all rights and easements necessary for the project are acquired prior to the
construc�on le�ng. This shall include civil site improvements associated with the Greenbelt
Ini�a�ves.
j. Ensure that all u�lity coordina�on ac�vi�es necessary to facilitate project construc�on have been
performed prior to the construc�on le�ng. This shall include civil site improvements associated
with the Greenbelt Ini�a�ves.
k. Perform technical, constructability, and maintainability reviews, including life cycle costs,
accessibility, equipment clearances, etc. prior to the construc�on le�ng. This shall include civil
site improvements associated with the Greenbelt Ini�a�ves.
l. Responsible for overseeing the prepara�on of construc�on bid documents by the project design
consultants, including the review of plans, specifica�ons, es�mates of quan��es, bid schedules
invita�ons to bid or request for proposals that shall comply with the County procurement code.
This shall include civil site improvements associated with the Greenbelt Ini�a�ves.
m. Conduct pre -bid mee�ngs, review bids, and advise the County through selec�on and contract
award process. This shall include civil site improvements associated with the Greenbelt Ini�a�ves.
n. Coordinate and/or conduct value engineering studies and recommenda�ons as may be requested
to reduce construc�on costs. This shall include civil site improvements associated with the
Greenbelt Ini�a�ves.
o. Review and maintain project related correspondence and files. This shall include civil site
improvements associated with the Greenbelt Ini�a�ves.
p. Perform public outreach ac�vi�es including public mee�ng facilita�on, mailer and handout design,
coordinate response to public comments and mee�ngs, or as required. This shall include civil site
improvements associated with the Greenbelt Ini�a�ves.
2. Task 2 – Program and Financial Management
a. Provide a writen monthly Program Status Report for County staff and Council, due by 12:01p.m.
local �me on the 15th of each month.
b. Atend all mee�ngs associated with the program as directed by the County.
c. Prepare a Program Management Plan t h a t w i l l s e r v e a s t h e p l a y b o o k f o r t h e e n � r e s a l e s t a x
program. This document will outline governance, communica�on protocols, public informa�on
and repor�ng strategies, risk management strategies, quality control measures, and every aspect
of program execu�on.
d. Prepare a Master Program Schedule that sequences all projects over the 15 -year period, using
logical priori�es, dependencies, and funding flows. The master schedule shall integrate individual
cri�cal path method project schedules into a program -wide Gant chart that clearly shows and
tracks cri�cal tasks and deadlines a for the design, right of way acquisi�on, permi�ng, and
construc�on for all projects within the program and the �meline for Greenbelt
acquisi�ons/improvements. This will be updated quarterly and as projects progress.
e. Develop and maintain a Program Financial Plan to forecast Program revenues, project
expenditures, and cash balances. The financial plan shall be in accordance with the CIP and the
Consultant will par�cipate in the County’s annual CIP planning process. Revenue and cash reports
will be County derived and maintained.
f. Provide quarterly financial reports to include revenues, encumbrances, and expenditures, due 30
days a�er the end of the quarter, using data provided by the County Finance Department.
g. Develop and implement a Public Involvement Plan which shall include a Program website, strategic
use of social media, holding public mee�ngs as requested to provide accurate, up to date project
informa�on to the ci�zens of Jasper County. This shall include civil site improvements associated
with the Greenbelt Ini�a�ves.
h. Develop and manage a dedicated Program Website, hosted and maintained by the Consultant with
a link to/from the County’s web site, to display program informa�on, project updates, interac�ve
maps, �melines, and financial summaries, FAQ as well as an op�on for ci�zens to ask ques�on or
provide input.
i. Develop and implement a project Data Management System that provides readily accessible,
complete, and well-organized files for each project.
j. Provide the County with recommenda�ons for the �ming and amount of bond issuances, based
upon the Program Financial Plan.
k. Review and recommend methods to maximize efficiency and achieve economies of scale in the
procurement of projects.
l. Develop consistent design criteria, standards, and specifica�ons for use on projects developed by
the Program where needed due to no available or applicable SCDOT design criteria or SCDOT
standard specifica�ons.
m. Inves�gate, recommend, and pursue upon direc�on form the County, available Grant
Opportuni�es on behalf of the County.
n. Develop and implement a public involvement program which should include, at a minimum, a
Program website hosted and maintained by the Consultant with a link to the County’s web site,
and use of social media to provide accurate, up to date project informa�on to the ci�zens of Jasper
County. This shall include civil site improvements associated with the Greenbelt Ini�a�ves.
o. Assist with document produc�on related to Freedom of Informa�on Act (FOIA) requests and other
requests for informa�on as applicable.
p. Assist with the development of encroachment permits, intergovernmental agreements (IGA),
memorandums of understanding (MOU), memorandums of agreement (MOA) and financial
par�cipa�on agreement (FPA) to facilitate coordina�on with the SCDOT, South Carolin a State
Infrastructure Bank (SCSIB) and other applicable par�es as needed.
q. Determine a method to evaluate project risk and cost, conduct risk analysis as needed, and make
recommenda�ons based on analysis. (Risk analysis per SOQ)
r. Conduct bid analysis/evalua�on of bids or prepare cost es�mates for comparison when
appropriate. Provide construc�on cost es�mate when requested.
3. Task 3 – Project Planning, Scoping, and Conceptual Design
Establish the scope of improvements, cost es�mates, and baseline cost-loaded schedules for each project
including the following subtasks. This shall include the civil site improvements associated with the
Greenbelt Ini�a�ves.
A. Development of Conceptual Project Design
o Perform feasibility and ini�al constructability review of a conceptual design and scope of
each project. Provide baseline costs and schedule, to include design, right -of-way,
construc�on, u�lity coordina�on, u�lity reloca�on, and permi�ng.
o The conceptual designs shall be developed in accordance with the South Carolina
Department of Transporta�on (SCDOT) Highway Design Manual and the American
Associa�on of State Highway and Transporta�on Officials (AASHTO) “A Policy on
Geometric Design of Highways and Streets”.
o Conceptual designs shall be developed on aerial photography and available GIS. Design
features to be illustrated shall include the proposed roadway typical sec�ons, roadway
alignments, lane configura�ons, auxiliary intersec�on turn lanes, and bicycle &
pedestrian facili�es. The conceptual designs shall be presented on color roll- plots for
coordina�on with project stakeholders and on 11” x 17” size sheets for incorpora�on into
a project planning report.
o Work to minimize impacts to private property, buildings, cultural features (churches,
cemeteries, parks, etc.), major u�li�es, and natural resources in the development of the
project conceptual designs. COUNTY GIS property lines shall be referenced into the
conceptual design to es�mate right of way impacts for each project. Impacts on buildings
and cultural features shall be es�mated from aerial photography and a project field
review.
o Perform an environmental screening to determine the presence of likely hazardous
material sites, threatened and endangered species, historical/cultural resources,
floodplains, and jurisdic�onal wetlands within the project area. The presence of these
environmental constraints will be determined through a windshield survey and database
searches.
o Iden�fy the expected permits and NEPA compliant environmental document (Categorical
Exclusion, Environmental Assessment, or Environmental Impact Statement) required for
each project based on conceptual design and environmental screening.
B. Baseline Cost Es�mates and Schedules
o Prepare a cost es�mate for each project based on the conceptual project design. Project
cost es�mates shall represent the total cost of project development and include the
following typical project costs:
• Engineering services (planning and design),
• Right of way acquisi�on (land and services),
• Wetland mi�ga�on,
• U�lity reloca�on (u�li�es with prior rights),
• Construc�on,
• Construc�on engineering & inspec�on.
o Appropriate factors shall be applied in coordina�on with the COUNTY to provide for
con�ngency within each project budget to address unforeseen condi�ons.
o Baseline schedules to be developed for each project shall include the project phases of
planning and design, right of way acquisi�on, environmental permi�ng, u�lity
coordina�on, construc�on procurement, and construc�on. Cost es�mates associated
w i t h e a c h o f t h e s e p r o j e c t p h a s e s s h a l l b e u s e d t o c r e a t e a c o s t l o a d e d s c h e d u l e f o r
purposes of program financial planning.
o Evaluate projects through a cost -risk analysis to iden�fy risks to the project scope or
schedule which may significantly impact project cost. A cost -risk workshop will be
conducted for each project to engage subject mater experts in a review of the projects
to iden�fy poten�al risks based on their experience with transporta�on project
development in the area. The project cost es�mate will be refined to account for the
magnitude and likelihood of each iden�fied risk.
C. Environmental Overview
o Prepare a Project Planning Report for each project to present the conceptual design,
environmental overview, u�lity overview, cost es�mate, and schedule. The reports shall
contain the following informa�on:
• Dra� Purpose and Need Statement,
• Project Descrip�on,
• Design Criteria,
• Conceptual Design,
• Project Loca�on and Length,
• Environmental Constraints
• Iden�fy the Required NEPA Environmental Document,
• Iden�fy the Required Environmental Permits,
• U�lity Informa�on
• Cost Es�mate
• Schedule
o These reports will be submited to the County and SCDOT (if applicable) for review and
comment. All comments will be addressed as applicable in a comment response matrix
and revised final reports will be provided to the County.
D. Plan Review
o For projects on SCDOT roadways or within SCDOT ROW , the consultant shall conduct a
cursory review prior to submital to SCDOT. The review will ensure that plans sa�sfy
SCDOT requirements and foreseeable errors are addressed. Detailed review of design
and/or calcula�ons will not be required.
o For projects in the County or municipal system (not encroaching into SCDOT rights of
way), the consultant will act as the County reviewer and will review for design,
calcula�on, adherence to appropriate standards and specifica�ons, and constructability.
o If plans require submital to County planning or other departments for review, then the
Consultant will facilitate those submitals and communicate as needed.
4. Task 4 – U�lity Coordina�on Services
a. Prepare a U�lity Coordina�on Plan for the Program, to guide the procedures for an ongoing
process from concep�on to construc�on, to include Proac�ve Conflict Iden�fica�on, Collabora�on
& Communica�on, Data -Driven Decisions, Risk Assessments and Mi�ga�on Strategies, &
Con�ngency Planning and Budge�ng, Regular Joint Mee�ngs, and Legal Rights and Contractual
Agreements.
b. No�fy all known u�lity owners in the area of the projects and iden�fy those u�li�es with exis�ng
and proposed facili�es in the project areas.
c. Facilitate and act as intermediary between project design team and u�lity representa�ves.
d. Hold regular joint u�lity mee�ngs with u�lizes once ini�al projects begin design phase.
e. Arrange for Project Design teams to employ Subsurface U�lity Engineering (SUE) to establish u�lity
loca�ons and iden�fy conflicts .
f. Obtain leters of “no-conflict” for those u�li�es which are not impacted.
g. Coordinate with u�lity owner(s) and designer(s) to develop reloca�on plans for those conflicts
which cannot be eliminated.
h. Review all u�lity owners’ reloca�on plans to ensure that reloca�ons proposed by one owner do
not conflict with another’s reloca�on.
i. Establish prior rights of occupancy.
j. Obtain no-cost leters from those u�lity owners without prior rights or develop u�lity agreements
with those owners who can document their prior rights.
k. Evaluate the feasibility of in -contract u�lity reloca�on and develop necessary agreements in
coordina�on with the u�lity owner.
l. Develop Contractual Provisions and Incen�ves:
• Clear U�lity Reloca�on Clauses: Incorporate explicit clauses in construc�on contracts that
clearly define responsibili�es for u�lity coordina�on, reloca�on, and unexpected discoveries.
• In u�lity agreements consider incen�ves for early reloca�on and penal�es for unreasonable
delays.
m. Monitor the progress of u�lity reloca�on and incorporate u�lity reloca�on schedules into the
overall project schedule and master program schedule.
n. This shall include U�lity Coordina�on Services for civil site improvements associated with the
Greenbelt Ini�a�ves.
5. Task 5 – Program Construc�on Administra�on
a. Constructability reviews of plans and specifica�ons prepared for projects prior to construc�on
le�ng.
b. Atend pre-construc�on conferences, rou�ne construc�on coordina�on mee�ngs, etc.
c. Reviewing and maintaining records of plans, specifica�ons, shop drawings, revisions,
correspondence, warran�es, etc.
d. Monitor each construc�on project and prepare monthly status reports.
e. Evalua�ng and recommending ac�ons related to progress payments, change requests, claims,
disputes, etc.
f. Performing project close-out ac�vi�es.
g. Fostering and maintaining a posi�ve public image related to construc�on opera�ons by proper
interac�on with the public and media, maintenance of traffic, aten�on to safety, permit
compliance, etc.
h. This shall include Construc�on Administra�on for civil site improvements associated with the
Greenbelt Ini�a�ves.
6. Task 6 - Right of way Acquisi�on Services
The CONSULTANT will perform Right -of-Way Acquisi�on Phase Services for the COUNTY on the
Transporta�on Sales Tax projects on an as needed basis.
The Right-of-Way Services include the following items:
The CONSULTANT may be required to:
a. Prepare a Right of Way Acquisi�on Plan for the Program, to supplement the applicable procedures
and policies outlined in the SCDOT Right -of-Way Acquisi�on Manuals, as may be warranted for
iden�fying easement and right of way needs, procurement of appraisals and �tle research,
property owner contact, and other necessary tasks as requested by the County.
b. Provide Right-of-Way services to coordinate, plan, direct, and control R-O-W ac�vi�es necessary
to legally acquire and record R-O-W needed for construc�on, ensuring that all R-O-W acquired for
federally assisted projects complies with the Uniform Reloca�on Assistance and Real Property
Acquisi�on Policies Act of 1970 (Public Law 91-646), as amended; and that all R-O-W acquired for
state assisted projects complies with Titles 57 and 28 of the S. C. Code of Laws, as amended; and
that all Right-of-Way acquired complies with all other applicable laws, ordinances, regula�ons,
policies, etc.
c. Forecast and es�mate Right -of-Way acquisi�on schedules and Right-of-Way cash flow
expenditures and �melines for acquisi�on.
The following services will be performed on an as-needed basis for the individual projects, and scopes and
fees will be provided to the COUNTY for each Right-of-Way Acquisi�on assignment.
a. Perform �tle search and provide �tle opinions for parcels requiring acquisi�on.
b. Provide appraisal cost es�mates for acquisi�ons, by a South Carolina licensed appraiser.
c. Procure or perform appraisals and review the appraisals provided by others.
d. Nego�ate acquisi�ons, providing a translator when necessary.
e. Li�ga�on is not included in the scope of services and will be provided through the Jasper County
Atorney's Office.
EARLY KNOWN DELIVERABLES BY THE CONSULTANT
No. Task Deliverable Descrip�on Due Date
(Calendar Days a�er NTP)
1 2.c. Program Management Plan 120
2 2.d. Master Program Schedule 90
3 2.e. Program Financial Plan 90
4 2.g. Public Involvement Plan 60
5 2.h. Program Web Site Development and Startup 60
6 2.i. Data Management Plan / System 60
7 2.l. Design Criteria and Standards 60
8 2.q. Risk Analysis Method 60
9 4.a. U�lity Coordina�on Plan 60
10 6.a. R/W Acquisi�on Plan 90
SCHEDULE
The CONSULTANT shall provide these services for a period of five (5) years as shown in Exhibit C - Schedule
and may be amended during that as mutually agreed to add services . This agreement may be extended
at the end of five years by mutual agreement between the COUNTY and the CONSULTANT.
FEE
Program Management Services (Tasks 1 - 6) shall be invoiced on an hourly fee basis, and a lump sum for
the early known deliverables, not-to-exceed $ 8,985,000.00 over the five year term of the contract .
Individual Task Orders may be executed under this contract for specified projects and tasks . The
CONSULTANT shall be compensated in accordance with mutually agreed upon Task Orders for which the
specific scope, schedule and fee for each job order will be individually nego�ated.
REQUEST FOR QUALIFICATIONS (RFQ)
RFQ #2025 –03
Program Manager – Transportation Sales Tax
Program
Advertised: March 17, 2025
RFQ Due: April 30, 2025
EXHIBIT B-1
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 2
I. GENERAL INFORMATION
Jasper County is soliciting responses from qualified engineering firms (“Offerors” or
“Contractors”) licensed in South Carolina to provide Program Management and Civil
Engineering related professional services as further described herein.
RFQ MUST BE PHYSICALLY RECEIVED, AS INDICATED BELOW, BY 3:00PM ON
Wednesday, April 30, 2025.
Issue Request for Qualifications (RFQ) March 17, 2025
Pre-Submittal Conference April 9, 2025, 1 pm
Deadline for Inquires April 11, 2025, 1 pm
Response to Inquiries April 16, 2025
Deadline for Submitting Proposal April 30, 2025, 1 pm
II. INSTRUCTIONS TO BIDDERS
1. Pre-Submittal Conference
The County will conduct an in-person Non-Mandatory Pre-Submittal conference as
part of this process to provide additional project information and expound upon
potential questions. This conference will be held on Wednesday, April 9, 2025 at
1:00 PM in Jasper County, Clementa Pinckney Government Building, County Council
Chambers, Third Floor, 358 Third Avenue, Ridgeland, SC 29936.
Attendance is not mandatory, all interested firms are strongly encouraged to attend.
Any questions regarding this project must be submitted in writing via email no later
than Friday April 11, 2025, by 1:00 PM. Questions should be emailed to
jiwanicki@jaspercountysc.gov. All submitted questions will be addressed and
posted on Jasper County’s Bids and Solicitations Web Page
https://www.jaspercountysc.gov/services/bids-and-solicitations and the Jasper
County Vendor Registry website/ April 16, 2025.
2. Proposal Opening Location
The Proposals will be publicly opened at the Jasper County, Clementa Pinckney
Government Building, County Council Chambers, Third Floor, 358 Third Avenue,
Ridgeland, SC 29936. Proposals will be opened on the due date, Wednesday,
April 30, 2025 at 1:00 pm. Only the names of Offerors will be provided at the
opening. No other information will be shared at that time. All Offerors or their
representatives are invited to attend the proposal opening.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 3
3. Submittals
Jasper County is hereby issuing this Request for Qualifications (RFQ) to firms that
have the capability and interest in undertaking and performing the scope of work
described in this RFQ. The RFQ is being publicly advertised in accordance with
Jasper County procurement guidelines. Each firm responding to this solicitation is
officially a RESPONDENT or PROPOSER. Each respondent must submit a sealed
package containing original and eight (8) copies of the RFQ. In a separate sealed
package original and two (2) copies of the Fee Schedule. All submissions will be
logged in and date and time stamped.
Printed submittals must be clearly labeled on the outside of the envelope with the
following wording:
a. For the RFQ:
JASPER COUNTY RFQ #2025 – 03 March 17, 2025 RFQ DOCUMENTS
b. For the Fee Schedule:
JASPER COUNTY RFQ #2025 – 03 March 17, 2025 Fee SCHEDULE
All late submittals will be rejected. Jasper County, South Carolina is not responsible
for late submissions caused by delays in mail delivery or a delay in any other
method of delivery. Print size shall be 12 pt. font minimum, on 8½ by 11 paper,
double-sided and must include all of the information required in this RFQ. Provide a
cover page that includes: Company Name, Address, Point of Contact (Email
Address and Phone Number, and Date of Submission.
SUBMITTALS SHALL NOT EXCEED A TOTAL OF 75 PAGES. A PAGE IS
CONSIDERED TO BE ONE SIDE OF A SHEET OF PAPER IF PRINTED. EXCEEDING
THE PAGE LIMIT IS GROUNDS FOR REJECTION OF THE SUBMITTAL. The following
WILL NOT be counted as pages:
a. Front and/or back cover pages of your Qualifications document
b. Table of Contents for your Qualifications document
c. Section Dividers for your Qualifications document
d. AFFIDAVIT OF COMPLIANCE document
e. Fee Schedule/Proposal - Submitted Separately from the Qualifications
If you have any questions on the above page limit information email
iiwanicki@jaspercountysc.gov .
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 4
4. Proposed Procurement Timeline
Release date for RFQ March 17, 2025
Pre-Submittal Conference April 9, 2025
Final Date to Receive Written Questions April 11, 2025
Addenda to Answer Questions April 16, 2025
RFQ Closing Date April 30, 2025
Completion of Selection Committee Review and
Recommendation
May 21, 2025
Jasper County Council June 2, 2025
Execution of Contract June 16, 2025
5. Sealed and Marked
If sent by mail, or hand-delivered, original signed Proposals shall be submitted in a
sealed package, clearly marked on the outside of the package with RFP #2025 – 3
PROGRAM MANAGER and addressed to:
Kimberly Burgess, Procurement Officer
Director, Administrative Services Division Jasper County
358 Third Avenue, Suite 304
P.O. Box 1149
Ridgeland, SC 29936
It is the proposer’s sole responsibility to deliver the proposal to the Jasper County
Administrative Services Division Procurement Office for receipt on or before the due
date and time indicated. If a Proposal is delivered by U.S. Mail, the Proposer shall
be responsible for its timely delivery to the Procurement Office. Proposals delayed
by mail shall not be considered and shall be rejected. Proposals may be mailed to
the Procurement Office and accepted if the signed Proposal forms and required
submittals are mailed and received prior to the due date and time. Proposals
submitted via email will not be accepted. All submissions will be logged in and date
and time stamped. Any Qualifications received after the date and time specified
will be logged and date and time stamped as "late" and will remain unopened.
and returned unopened to the respondent.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 5
6. Legal Name and Signature
Proposals shall clearly indicate the legal name, address, and telephone number of
the Proposer. Proposals shall be manually signed above the printed name and title
of signer on the Affidavit of Compliance page. The signer shall have the authority to
submit Proposals on behalf of the Proposer. Failure to properly sign the Proposals
form shall invalidate the Proposals and it shall not be considered for award.
7. Clarification and Addenda
Each Proposer shall examine REQUEST FOR QUALIFICATIONS documents. The
Administrative Services Division, Procurement Officer shall not be responsible
for interpretations or clarifications of Project Scope.
All inquiries or suggestions, concerning interpretation, clarification, or
additional information pertaining to the Project Scope shall be made in writing
or through email to:
Jim Iwanicki, Engineering Services Director
Jasper County
623 Live Oak Drive
P.O. Box 1244
Ridgeland, SC 29936
jiwanicki@jaspercountysc.gov
Any inquiries or suggestions, concerning clarification of the REQUEST FOR
QUALIFICATIONS (excluding Project Scope) shall be made through the
Procurement Officer in writing or through email to:
Kimberly Burgess, Procurement Officer
Director, Administrative Services Jasper County
358 Third Avenue, Suite 304
P.O. Box 1149
Ridgeland, SC 29936
kburgess@jaspercountysc.gov
8. Responsive and Responsible Proposals
To be responsive, the proposal shall conform in all material respects to the
requirements set forth in the REQUEST FOR QUALIFICATIONS. To be responsible,
the proposal shall perform fully the requirements, experience, reliability, capacity,
and equipment that will ensure good faith performance.
9. Reserved Rights
Jasper County reserves the right to make such investigations as it deems necessary
to make the determination of the proposer’s responsiveness and responsibility.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 6
10. Applicable Law
All applicable laws and regulations of the United States of America, the State of
South Carolina and Jasper County will apply to any resulting agreement, contract, or
purchase.
11. Right to Protest
Appeals and remedies are provided for in the Jasper County Purchasing and
Contracting Ordinance, Article V , Jasper County Code of Ordinances.
12. Contract Forms
Any agreement, contract, or purchase order resulting from the acceptance of a
Proposal shall be on forms either supplied by or approved by the Jasper County
Procurement Officer.
13. Forms, Alternates, Variances
Proposals must be submitted on the attached REQUEST FOR QUALIFICATIONS
forms, although additional information may be attached. The Offerors must indicate
any variance from the requested scope of services and/or terms and conditions, on
the RFQ Affidavit of Compliance. Otherwise, Offerors must fully comply with the
requested Scope of Services, terms and conditions. Alternate Proposals may or may
not be considered at the sole discretion of Jasper County.
14. Proposal Prices
Provide an Hourly Rate Schedule for each billable title within the firm, mark-up
costs for subconsultants, vendors, and suppliers, etc.., and a schedule of
reimbursable costs and rates. Each item must be proposed separately, and no attempt
is to be made to tie any item(s) in with any other item or items.
15. Descriptive Information
All equipment, materials, and articles incorporated in the product/work covered by
this REQUEST FOR QUALIFICATIONS are to be new and of suitable grade for the
purpose intended.
16. Deviations to Scope of Work and Requirements
Any deviation from the scope of work as written and accepted by the County may be
grounds for termination of the Contract.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 7
Quality
If any work product delivered does not meet applicable scope of work, or if the work
product does not meet industry standard performance and professionalism, the
Contractor shall redo the work at no expense to Jasper County. Contractor shall
refund to the County any money which has been paid to the Contractor for any work
not redone to meet industry standards and professionalism. The Contractor shall be
responsible for attorney fees in the event the Contractor defaults and court action is
required.
The County reserves the right to reject any or all materials/equipment if, in its
judgement, the item reflects unsatisfactory workmanship, manufacturing, or
shipping damages.
17. Regulations
It shall be the responsibility of the Consultant to ensure compliance with Federal,
State of South Carolina, and County laws, rules, regulations, or other requirements,
as may apply.
18. Termination of Award
Failure of the Consultant to satisfy the requirements of Jasper County shall be
reason for termination of the award. Any Proposal may be rejected in whole or in
part for good cause when in the best interest of the County.
19. Royalties and Patents
The successful Consultant shall pay all royalties and license fees for equipment or
process in conjunction with the equipment being furnished. Consultant shall
defend all suits or claims for infringement of any patent right and shall hold the
County harmless from loss on account or cost and attorney’s fees incurred.
20. Inspection and Acceptance
No item(s) received by the County pursuant to this contract shall be deemed
accepted until the County has had reasonable opportunity to inspect the
item(s). Any item(s) discovered defective, or which do not conform to any
warranty of the seller upon inspection may be returned at the seller’s expense
for full credit or replacement.
If later, defects are discovered which were not ascertainable upon the initial
inspection, the item(s) may also be returned at the Seller’s expense for full
credit or replacement. The County’s return of defective items shall not exclude
any other legal, equitable or contractual remedies the County may have.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 8
III. GENERAL TERMS AND CONDITIONS
1. Exceptions to Specification
Offerors taking exception to any part or section of the specifications shall indicate
such exceptions on the Affidavit of Compliance Form and continuation page(s), if
necessary. Failure to indicate exceptions shall be interpreted as the Proposer’s
intent to fully comply with the specifications as written.
2. Evaluation of Proposals
Any Purchase Order or Purchase Sales Agreement resulting from this REQUEST FOR
QUALIFICATIONS shall be awarded to the PROPOSER providing the best proposal as
determined by Jasper County, South Carolina.
AWARD WILL NOT BE MADE ON THE BASIS OF PRICE.
The committee will have representatives from the County, City of Hardeeville, Town
of Ridgeland, and Jasper County School District.
Responses will be evaluated using the following criteria:
A. Qualifications, Abilities, and Experience of Key Personnel (35%) - Each firm
will be evaluated on the experience and qualifications of the key personnel that
will be assigned to the Program Management Team.
B. Experience of the Firm and References (35%) - Each firm shall be evaluated on
its demonstrated capabilities and experience to provide the desired services.
Review will include but not be limited to past performance on similar types of
work, quality of work, and adherence to schedules
and other related factors.
History of working with municipalities and other local governments will also be
considered. Review will include review of any subcontractors specified in
Offeror’s submittal as well.
C. Succession Planning (20%) – Each firm will be evaluated on its ability to provide
quality service during a change in the Project Team’s key personnel.
D. Proposal Quality (10%) - Each firm will be evaluated on how the RFQ was put
together and the readability of the document.
After initial scoring of the above criteria, the County reserves the right to select a
short list of finalists for a presentation/interview. Results of the interview process
shall factor into the final scoring for contract award.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 9
3. Award
Each factor of the evaluation will be considered relative to obtaining the most effective
plan consistent with the needs of the County.
4. Product Liability Insurance
The successful proposal will supply proof of professional liability insurance and workers
compensation.
IV. SCOPE OF SERVICES
1. Project Purpose
Jasper County voters passed a transportation sales tax referendum that passed in
November 2024. The County seek proposals from firms qualified to provide program
and financial management, project management, project planning, scoping,
conceptual design, utility coordination, and preliminary right-of-way coordination for
Transportation Projects for the proposed 2024 1% Transportation Sales and Use Tax
and for civil site improvements associated with the Greenbelt Initiatives identified
in this RFQ. The sales tax program is included as an attachment. Responses to the
solicitation for Program Management should be consider the following:
• The firm selected for Program Management will be excluded from working as the
design engineer for any design contract awarded through the sales tax program.
• Selected Program Manager may be able to perform construction management
and CEI services for projects under the sales tax program.
2. Scope of Work
Task 1 – Project Management Services
• Assist the County in obtaining Local Public Agency (LPA) status with South
Carolina Department of Transportation (SCDOT).
• Act as an extension of County staff and provide all the needed services to the
County to comply with SCDOT’s LPA requirements.
• Coordinate, manage, and review project plans, technical reports, specifications,
and estimates prepared by consultants providing professional services to the
County for consistency with contract budgets, schedules, scope of work, design
criteria, and applicable standards. This would include civil site improvements
associated with the Greenbelt Initiatives.
• Prepare independent estimates for professional services and assist the County
with scope and fee negotiations with project design consultants also to include
civil site improvements associated with the Greenbelt Initiatives.
• Review project design consultant invoices for accuracy, compliance with
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 10
contract terms, and progress of the work. This would include civil site
improvements associated with the Greenbelt Initiatives.
• Conduct meetings, monitor design progress, and keep the County informed of
each project’s status. This would include civil site improvements associated with
the Greenbelt Initiatives.
• Ensure compliance with SCDOT LPA procedures for projects involving state
and/or federal funds.
• Ensure that all necessary permits and environmental approvals are obtained prior
to letting a project for construction. This would include civil site improvement s
associated with the Greenbelt Initiatives.
• Ensure that all rights and easements necessary for the project are acquired prior
to the construction letting. This would include civil site improvement associated
with the Greenbelt Initiatives.
• Ensure that all utility coordination activities necessary to facilitate project
construction have been performed prior to the construction letting. This would
include civil site improvements associated with the Greenbelt Initiatives.
• Responsible for overseeing the preparation of construction bid documents. This
would include civil site improvements associated with the Greenbelt Initiatives.
• Conduct pre-bid meetings, review bids, and advise the County through selection
and contract award. This would include civil site improvement s associated with
the Greenbelt Initiatives.
• Review and maintain project related correspondence and files. This would
include civil site improvements associated with the Greenbelt Initiatives.
• Coordinate value engineering studies and recommendations. This would include
civil site improvements associated with the Greenbelt Initiatives.
• Perform technical, constructability, and maintainability reviews, including life
cycle costs, accessibility, equipment clearances, etc. This would include civil
site improvement associated with the Greenbelt Initiatives.
• Coordinate with municipalities, environmental agencies, and other project
stakeholders as applicable to secure necessary approvals and permits. This
would include civil site improvements associated with the Greenbelt Initiatives.
• Perform public outreach activities including public meeting facilitation, mailer
and handout design, coordinate response to public comments and meetings, or
as required. This would include civil site improvements associated with the
Greenbelt Initiatives.
Task 2 – Program & Financial Management
• Provide a written monthly Program Status Report for County staff and Council due
by 12:01p.m. local time on the 15
th of each month.
• Attend all meetings associated with the program as directed by the County.
• Provide quarterly financial reports to include revenues, encumbrances, and
expenditures.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 11
• Develop and maintain a Program Financial Plan to forecast Program revenues,
project expenditures, and cash balances. The financial plan shall be in
accordance with the CIP and the Consultant will participate in the County’s annual
CIP planning process. Rev enue and cash reports will be County driven and
maintained.
• Provide the County with recommendations for the timing and amount of bond
issuances based upon the Program Financial Plan.
• Develop and maintain cost loaded schedules for the design, right of way
acquisition, permitting, and construction for all projects within the program.
• Develop and implement a project filing system that provides readily accessible,
complete, and well-organized files.
• Review and recommend methods to maximize efficiency and achieve economies
of scale in the procurement of projects.
• Develop consistent design criteria, standards, and specifications for use on
projects developed by the Program.
• Investigate and pursue available grant opportunities on behalf of the County.
• Develop and implement a public involvement program which should include, at a
minimum, a Program website hosted and maintained by the Consultant with a
link to the County’s web site, and use of social media to provide accurate, up to
date project information to the citizens of Jasper County. This would include civil
site improvements associated with the Greenbelt Initiatives.
• Assist with document production related to Freedom of Information Act (FOIA)
requests and other requests for information as applicable.
• Assist with the development of encroachment permits, intergovernmental
agreements (IGA), memorandums of understanding (MOU), memorandums of
agreement (MOA) and financial participation agreement (FPA) to facilitate
coordination with the SCDOT, South Carolin a State Infrastructure Bank (SCTIB)
and other applicable parties as needed.
• Determine a method to evaluate project risk and cost, conduct risk analysis as
needed, and make recommendations based on analysis.
• Conduct bid analysis/evaluation of bids or prepare cost estimates for comparison
when appropriate. Provide “engineers estimate” when requested.
• Other items assigned by Jasper County.
Task 3 – Project Planning, Scoping, and Conceptual Design
• Establish the scope of improvements, cost estimates, and baseline cost -loaded
schedules for each project including the following subtasks. This would include
civil site improvements associated with the Greenbelt Initiatives.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 12
A. Development of Conceptual Project Design
o Perform feasibility and initial constructability review of a conceptual design
and scope of each project. Provide baseline costs and schedule, to include
design, right-of-way, construction, utility coordination , utility relocation, and
permitting.
o The conceptual designs shall be developed in accordance with the South
Carolina Department of Transportation (SCDOT) Highway Design Manual and
the American Association of State Highway and Transportation Officials
(AASHTO) “A Policy on Geometric Design of Highways and Streets”.
o Conceptual designs shall be developed on aerial photography and available
GIS. Design features to be illustrated shall include the proposed roadway
typical sections, roadway alignments, lane configurations, auxiliary
intersection turn lanes, and bicycle & pedestrian facilities. The conceptual
designs shall be presented on color roll -plots for coordination with project
stakeholders and on 11” x 17” size sheets for incorporation into a project
planning report.
o Work to minimize impacts to private property, buildings, cultural features
(churches, cemeteries, parks, etc.), major utilities, and natural resources in
the development of the project conceptual designs. COUNTY GIS property
lines shall be referenced into the conceptual design to estimate right of way
impacts for each project. Impacts on buildings and cultural features shall be
estimated from aerial photography and a project field review.
o Perform an environmental screening to determine the presence of likely
hazardous material sites, threatened and endangered species,
historical/cultural resources, floodplains, and jurisdictional wetlands within
the project area. The presence of these envir onmental constraints will be
determined through a windshield survey and database searches.
o Identify the expected permits and NEPA compliant environmental document
(Categorical Exclusion, Environmental Assessment, or Environmental Impact
Statement) required for each project based on conceptual design and
environmental screening.
B. Baseline Cost Estimates and Schedules
o Prepare a cost estimate for each project based on the conceptual project
design. Project cost estimates shall represent the total cost of project
development and include the following typical project costs:
o Engineering services (planning and design),
o Right of way acquisition (land and services),
o Wetland mitigation,
o Utility relocation (utilities with prior rights),
o Construction,
o Construction engineering & inspection.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 13
o Appropriate factors shall be applied in coordination with the COUNTY to
provide for contingency within each project budget to address unforeseen
conditions.
o Baseline schedules to be developed for each project shall include the project
phases of planning and design, right of way acquisition, environmental
permitting, utility coordination, construction procurement, and construction.
Cost estimates associated with each of these project phases shall be used to
create a cost loaded schedule for purposes of program financial planning.
o Evaluate projects through a cost -risk analysis to identify risks to the project
scope or schedule which may significantly impact project cost. A cost -risk
workshop will be conducted for each project to engage subject matter experts
in a review of the projects to identify potential risks based on their experience
with transportation project development in the area. The project cost
estimate will be refined to account for the magnitude and likelihood of each
identified risk.
C. Environmental Overview
o Prepare a Project Planning Report for each project to present the conceptual
design, environmental overview, utility overview, cost estimate, and
schedule. The reports shall contain the following information:
o Draft Purpose and Need Statement,
o Project Description,
o Design Criteria,
o Conceptual Design,
o Project Location and Length,
o Environmental Constraints
o Identify the Required NEPA Environmental Document,
o Identify the Required Environmental Permits,
o Utility Information
o Cost Estimate
o Schedule
o These reports will be submitted to the County and SCDOT (if applicable) for
review and comment. All comments will be addressed as applicable in a
comment response matrix and revised final reports will be provided to the
County.
D. Plan Review
o For projects on SCDOT roadways or within SCDOT ROW, the consultant shall
conduct a cursory review prior to submittal to SCDOT. The review will ensure
that plans satisfy SCDOT requirements and foreseeable errors are addressed.
Detailed review of design and/or calculations will not be required.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 14
o For projects in the County or municipal system, the consultant will act as the
County reviewer and will review for design, calculation, adherence to
appropriate standards and specifications, and constructability.
o If plans require submittal to County planning or other departments for review,
then the Consultant will facilitate and communicate as needed.
Task 4 – Utility Coordination Services
• Notify utility owners of the projects and identify those utilities with facilities in the
project area.
• Facilitate and act as intermediary between project design team and utility representatives.
• Arrange for Subsurface Utility Engineering (SUE) to establish utility locations and
identify conflicts.
• Obtain letters of “no-conflict” for those utilities which are not impacted.
• Coordinate with utility owner(s) and designer(s) to develop relocation plans for those
conflicts which cannot be eliminated.
• Review all utility owners’ relocation plans to ensure that relocations proposed by one
owner do not conflict with another’s relocation.
• Establish prior rights of occupancy.
• Obtain no- cost letters from those utility owners without prior rights or develop utility
agreements with those owners who can document their prior rights.
• Evaluate the feasibility of in -contract utility relocation and develop necessary
agreements in coordination with the utility owner.
• Monitor the progress of utility relocation and incorporate utility relocation schedules
into the overall project schedule.
This would include Utility Coordination Services for civil site improvements
associated with the Greenbelt Initiatives.
Task 5 – Construction Administration
• Constructability reviews of plans and specifications prepared for projects prior to
construction letting.
• Attend pre-construction conferences, routine construction coordination meetings, etc.
• Reviewing and maintaining records of plans, specifications, shop drawings, revisions,
correspondence, warranties, etc.
• Monitor each construction project and prepare monthly status reports.
• Evaluating and recommending actions related to progress payments, change requests,
claims, disputes, etc.
• Performing project close-out activities.
• Fostering and maintaining a positive public image related to construction operations by
proper interaction with the public and media, maintenance of traffic, attention to safety,
permit compliance, etc.
This would include Construction Administration for civil site improvements
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 15
associated with the Greenbelt Initiatives.
3. Approved Projects
S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane
widening with multi- use paths on both sides for approximately 3.8 miles and would
be coordinated with the SC 170 Widening and Access Management project
($57,000,000).
US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd): 6-lane road
widening for approximate 1 mile ($15,000,000).
US 278 Corridor Phase 2 (Argent Blvd to I-95): 6-lane road widening for
approximately 4.75 miles with two bridges (approx. 360 LF and 90 LF) ($50,000,000).
SC 46/SC 170/SC 315 Intersection Improvements and Widening: assume 1 mile
widening with intersection improvements at SC 46 and SC 170 to potentially
combine into 1 intersection ($30,000,000).
US 17/US 321 Intersection Improvement: skewed intersection in Hardeeville and
may contain complicated right of way acquisition, assumes existing bridge over
railroad can remain ($4,000,000).
US 17 Widening (SC 315 to SC 170): 4-lane divided widening for approximately 2
miles ($24,000,000).
SC 315 Widening from SC 170/SC 46 intersection to US 17: 4-lane/5-lane
widening for approximately 6 miles ($41,500,000).
SC 336 Intersection Improvements (Grahamville Rd to SC 336): potential
realignment of SC 336 for approximately 0.3 mile and potential for complicated R/W
acquisition: ($5,000,000).
I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road
Improvements: Upgraded interchange included with SCDOT I-95 project from MM 8
to MM 21. Project would include road improvements to US 17, Bees Creek Road,
and Glover Road ($12,000,000).
I-95 Exit 22 Connector (US 278 to Bees Creek Road): new road with potential new
bridge over I-95, dependent upon alignment and SCDOT’s improvements for Exit 22
for approximate 3 miles: ($36,000,000).
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 16
Glover Road (Bees Creek Road (S-13) to SC 462): Dirt road and paved road
improvement – assume 2 lanes with R/W purchase for future widening
($26,000,000).
US 278/SC 652 (Calf Pen Bay Road) Intersection Improvement: A traditional
intersection improvement on US 278 has been installed with left turn lane and right
turn onto SC 652, but improvements were not incorporated on SC 652. Turn lanes
with improved intersection realignment should be considered or a roundabout
should be installed as this could be a key intersection for traffic calming for
entrance to Ridgeland: ($2,000,000).
SC 462 (SC 170 to Snake Road): 4-lane divided or 5-lane widening for
approximately 3 miles and safety improvements for approximately 5 miles
($56,000,000).
US 17/Mackay Point Road Intersection: Realignment of S-27-37 to eliminate
skewed intersection with Mackay Point Road and may involve improved access
management on US 17, dependent on coordination with SCDOT, assume 0.6-mile
realignment and intersection improvement: ($5,000,000).
US 321/SC 336 Intersection Improvement: skewed intersection in Tillman
($2,500,000).
Reconstruction of Levy Road: ($10,000,000).
Greenbelt Initiatives: $94,000,000 for financing greenbelt initiatives (including but
not limited to, purchasing property for conservation, purchasing conservation
easements, creating passive greenspace, creating active greenspace, protecting
natural resources, protecting agricultural or heritage landscapes, and protecting
scenic corridors).
Notes:
• Program Manager will be involved as noted with civil site improvement
associated with the Greenbelt Initiatives.
• Appendix 1 includes location maps
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 17
4. Initial Priorities:
Jasper County officials have met, and the preliminary unofficial roadway priorities are
as follows:
S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane
widening with multi- use paths on both sides for approximately 3.8 miles and would
be coordinated with the SC 170 Widening and Access Management project
($57,000,000).
US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd): 6-lane road
widening for approximate 1 mile ($15,000,000).
US 278 Corridor Phase 2 (Argent Blvd to I -95): 6 -lane road widening for
approximately 4.75 miles with two bridges (approx. 360 LF and 90 LF) ($50,000,000).
I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road
Improvements: Upgraded interchange included with SCDOT I-95 project from MM 8
to MM 21. Project would include road improvements to US 17, Bees Creek Road,
and Glover Road ($12,000,000).
Reconstruction of Levy Road: ($10,000,000).
SC 336 Intersection Improvements (Grahamville Rd to SC 336): potential
realignment of SC 336 for approximately 0.3 mile and potential for complicated R/W
acquisition: ($5,000,000).
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 18
V. SUBMITTAL REQUIREMENTS AND FORMATTING
Offerors are REQUIRED to submit all requested information and/or documentation
outlined in this section of the solicitation. Any Offeror failing to do so may have their
response rejected as being non-responsive and making them ineligible for contract
award. Offerors shall submit their responses in a format and sequence that follows the
section numbering and layout provided in this solicitation to assist the County in its
evaluation of responses.
Offerors shall submit written qualifications which clearly demonstrate their ability to
provide quality services in an effective manner.
The County desires a firm with a history of meeting or exceeding client expectations,
providing effective communication between the client and the firm, a record of meeting
schedules and deadlines, distinct knowledge of local sales tax programs, permitting
requirements, a reputation as an effective steward of natural resources and the
environment, prudent contract administration and project accounting, and a quality
presentation of project deliverables.
Submittals shall include the following information, and should be arranged in labeled
sections as follows:
QUALIFICATIONS:
Section A: Personnel Technical Competence/Qualifications
1. Project Team Organizational Chart:
Provide an organizational chart identifying team members who would be
assigned to this contract (including sub-consultants). The organizational chart
must include the name, role/position, and office location of each team member
and subconsultant. A project team member may be responsible for more than
one area. The offeror shall identify the following, at a minimum:
• Overall Project Manager(s)
• Key Financial Management Team Members
• Communication/Public Engagement Team Members
• Civil Engineering Team Members
• Environmental Team Members
• Right of Way Team Members
• Construction Administration Team Members
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 19
2. Professional Resumes: Provide professional resumes of key project personnel
proposed for this contract and detailed background information including:
• Education;
• Professional registrations and certifications, applicable to South
Carolina;
• Experience;
• Years with firm;
• Office location;
• Specific role and responsibilities on past projects of this type;
• Hourly billing rates (in a separate sealed envelope).
3. Firm Reserves: Description of available backup personnel, resources and their
location.
4. Primary Point of Contact: Identify the Firm’s Primary Point of Contact.
5. Organization of sub-consultants and personnel: Provide the name of any firm(s)
and their personnel that will be providing sub-consulting services to your firm.
Also include the services they will provide, their office location, and a contact
name and phone number.
Section B: Background, Capabilities, Experience and Succession Planning
1. Range of Services: Provide a description of the full range of services the Firm
provides. Provide the number of years in business and the location of the main
office that will service the Town’s account including the location of any sub-
consultants.
2. Capabilities: Discuss the firm’s unique qualifications, capabilities and
methodologies that will be used for the Program Management of a Sales Tax
Program.
3. Prior Experience: Provide a complete list with detailed descriptions including
dollar value and time frame of the firm’s experience on similar Sales tax
Programs within the past 10 years. Specify the type of work performed, the
Firm’s Project Manager and personnel that worked on the referenced projects
including their role. Include project photos, budget and schedule. Identify if the
project was completed on time and on budget.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 20
4. Prior Experience: Provide experience, other than sales tax program experience,
from South Carolina that will help show the Offerors capabilities in delivering a
successful sales tax program. Include projects started no earlier than January 1,
2021. Also detail the firm’s experience working within Jasper County, if any
within the same period.
5. Succession Planning: Describe how the firm will address internal succession
planning so that as key personnel retire or move on from the company the
County’s Program is not negatively affected. Also list any long-term municipal
clients that have used the firm consistently (5 or more contracts) between
January 1, 2014, and today. Include the number of contracts and a contact
name phone number and email. Please note Section VII which states that if key
team members identified in this RFQ are no longer available and/or not being
used on this project the County reserves the right to terminate the contract.
6. Project References: Provide at least three (3) written references from Items 3, 4
and 5 above. Each reference shall provide a signed (electronic signatures are
acceptable) written reference from the client contact. The reference shall
include a short statement of satisfaction with the Offerors’ services as well as
why, in their opinion, the project(s) were successful. The references shall
include current e-mail and current phone number. The references shall come
from sources outside Jasper County.
7. Workload: Provide a summary of current workload and workload projections.
Present and anticipated workload of project team (please show in tabular
format with each team member’s anticipated obligations depicted over the life
of the project).
8. List of litigation history of the firm and all subconsultants for the past 5 years.
Section D: Scope of Work Approach
Discuss and provide insight into the Offerors approach to accomplish the Scope of
Work. Please make sure to identify what would set the Offerors approach apart
from others in the industry.
1. Project Management
2. Program & Financial Management
3. Project Planning, Scoping, and Conceptual Design
4. Utility Coordination
5. Construction Administration
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 21
Section E: Forms and Information
AFFIDAVIT OF COMPLIANCE must be submitted.
Section F: Costs (Submitted As a Separate Document)
THIS SHALL BE SUBMITTED AS A SEPARATE DOCUMENT AND NOT INCLUDED
WITH THE OTHER MATERIAL REQUESTED. Hourly rates will not be used in the
evaluation of submittals but instead will form the basis for contract negotiations
with the selected firm.
1. The Offeror shall submit a Billable Costs Document for their firm and all other
firms listed in the RFQ. At a minimum the document shall have the following:
a. An Hourly Rate Schedule for each billable title within the firm.
b. Mark Up Costs for subconsultants, vendors, and suppliers, etc.
c. A schedule of reimbursable costs and rates. (i.e. travel, copies,
mailing, etc.)
2. Once an initial hourly rate schedule is agreed upon, rates shall remain fixed for
the first year of the resulting contract. After the first year, Contractor may
request one (1) annual adjustment to the hourly rates to be effective on each
anniversary of the contract, but such increase shall not exceed the most
recently published Consumer Price Index for All Urban Consumers (CPI-U),
before seasonal adjustment as of sixty (60) days prior to the contract
anniversary date. Any rate increase shall require a written contract amendment
signed by both parties to become effective. If Contractor’s request for an
increase is made after the applicable contract anniversary date, such increase
shall not be retroactive to the anniversary date and instead shall be effective as
of the date of the signed contract amendment. Mark up cost and reimbursable
cost once established shall not be changed for the life of the contract.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 22
AFFIDAVIT OF COMPLIANCE
To be submitted with vendor’s Proposal
_________________ We Do Not take exception to the RFQ Documents/Requirements.
__________________We take exception to the RFQ Documents/Requirements as follows:
Specific exceptions are as follows:
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
I have carefully examined the REQUEST FOR QUALIFICATIONS and agree to abide by all
submitted pricing, delivery, terms and conditions of this Proposal unless otherwise
stipulated herein.
Company
Name______________________________________________________________________
By__________________________________________________________________________
(Authorized Signature)
____________________________________________________________________________
(Print Name and Title)
Company Address________________________________________________________________
_________________________________________________________________________________
_________________________________________________________________________________
RETURN THIS PAGE
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 23
AFFIDAVIT OF COMPLIANCE (continued)
Telephone Number____________________________________________________________
Email ________________________________________________________________________
Federal Tax ID No. _____________________________________________________________
DBE Vendor (Yes/No)
Minority Owned:___________________________________
Women Owned: ___________________________________
Veteran Owned:____________________________________
Date_____________________________________________________
ADDENDA
Proposer acknowledges receipt of the following addendum:
Addendum No. _______________
Addendum No. _______________
Addendum No. _______________
Addendum No.________________
RETURN THIS PAGE
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 24
STATEMENT OF “NO PROPOSAL”
Return this page only if your company provides the products/services being requested
and DECLINES to do so.
We, the undersigned, have declined to respond to the above REQUEST FOR
QUALIFICATIONS for Program Manager - Sales Tax Program for the following reasons:
___________ Specifications too “Narrow” , geared to one brand or manufacturer
(Please explain below).
___________ Insufficient Time to Respond to REQUEST FOR QUALIFICATIONS
___________ Unable to Meet Specifications
___________ Specifications Unclear (Please explain below)
___________ Other (Please explain below)
Remarks
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
________________________________________________________________________________
Company Name _______________________________________________________
Address _______________________________________________________________
_________________________________________________________________
_________________________________________________________________
Name and Title _________________________________________________________
Date___________________________________________________________________
Signature ______________________________________________________________
Telephone Number _____________________________________________________
Email Address _________________________________________________________
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 25
VI. CONTRACT AWARD
Contract award, as well as contract continuation of the contract in subsequent fiscal
periods, is subject to availability of County funds. In the event that contract
negotiations with the highest rated Offeror are unsuccessful, the County reserves the
right to begin contract negotiations with next highest rated Offeror.
If a contract is awarded as result of this solicitation, such award shall be made to the
most qualified respondent(s). In the event that contract negotiations with the most
qualified respondent(s) are unsuccessful, the County reserves the right to begin
contract negotiations with the next most qualified respondent(s).
VII. STANDARD CONTRACT TERMS AND CONDITIONS
Offeror acknowledges that a contract will need to be executed with terms and
conditions acceptable to the County and the Offeror.
The Offeror agrees that terms and conditions provided in this RFQ, and in their
response to the RFQ either in their entirety or relevant portions thereof, shall be
included and become part of any resulting contract.
Please note that if the County determines that key team members identified in this RFQ
are no longer available and/or not being used on this project the County reserves the
right to terminate the contract.
The anticipated term of the resulting contract shall be five (5) years.
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
Page | 26
APPENDIX 1 – Maps
Jasper County, South Carolina
RFQ #2025 - 03
Program Manager – Transportation Sales Tax Program
A
PPENDIX 2- Ordinance #0-2024-16
1
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
April 30, 2025
Jasper County Selection Committee
Kimberly Burgess, Procurement Officer
358 Third Avenue, Suite 304
Ridgeland, SC 29936
Re: RFQ #2025-03 | Program Manager – Transportation Sales Tax Program
Dear Members of the Selection Committee,
At Infrastructure Consulting & Engineering, LLC (ICE), we understand what it takes to deliver
a program of this size, complexity , and importance. The voter-approved Transportation Sales Tax
Program represents a major investment in Jasper County’s future and requires a program manager with
experience, structure, and local presence and understanding to make it successful. ICE is proud to
submit our Statement of Qualifications (SOQ) to serve that role.
Over the past decade, ICE has successfully managed voter-approved transportation programs
across South Carolina, including Berkeley , Charleston, and Lancaster Counties. We understand how
to coordinate with SCDOT, build and maintain public trust, and keep dozens of projects moving forward
while aligned under one cohesive plan. We know the pitfalls to avoid, the steps to streamline, and the
tools required to deliver transparent, efficient progress to your council and voters.
Leading our efforts for Jasper County will be Jeff Buckalew , PE, a highly experienced program
manager with over 35 years in civil engineering, including 15 years serving as the Town Engineer
for Hilton Head Island. During his tenure, Jeff oversaw hundreds of infrastructure projects, managed
capital improvement programs, and coordinated closely with municipal leadership, SCDOT, and the
public. His background combines hands-on technical expertise with strategic program oversight — skills
essential to guiding a multi-year transportation sales tax program. Jeff’s leadership ensures that Jasper
County will have a program manager who understands the challenges of local government infrastructure
delivery and is committed to serving as a trusted extension of County staff.
With multiple road widenings, safety improvements, key intersection upgrades, and phased construction
across several years, ICE understands this program demands discipline, communication, and a
close working partnership with County staff. These are exactly the types of projects ICE has built its
reputation on.
While this may be ICE’s first proposal to serve Jasper County , we’ve already supported Construction
Engineering & Inspection (CEI) services in the region and are preparing to open an office in Jasper
County to support our growing work in the area.
Most recently , SCDOT selected ICE to lead the Construction Management and Inspection for its largest-
ever bid-build project: the I-95 widening from MM 0 to MM 8, including replacement of the bridges over
the Savannah River and two interchanges. In addition, the City of Hardeeville has recently selected ICE
for on-call civil engineering services. This continued trust underscores our proven ability to manage
high-profile, mission-critical work and deliver results.
Infrastructure Consulting
& Engineering
RFQ - Statement of
Qualifications
as Submitted on 4/30/25
EXHIBIT B-2
As Program Manager , ICE will provide Jasper County with:
` T
ransparent Oversight: Establishing a tailored Program Management Plan, with real-time tracking
and clear communication from kick off through completion.
` Schedule Discipline:
Coordinating all phases–planning, permitting, right-of-way , design, and
construction–to stay ahead of delays and keep projects moving forward.
` Budget Contr
ol: Aligning cost and timelines through careful forecasting, risk management, and
funding strategy support.
` Stak
eholder Engagement: Supporting the County’s public outreach efforts and working closely
with SCDOT, municipalities, and the community to ensure consistent coordination.
` T
echnical and Regulatory Expertise: Applying SCDOT LPA standards, procurement compliance,
and construction management insight to deliver each project smoothly and compliantly .
ICE brings a full-service, in-house team across planning, engineering, environmental services, and
construction management – ready to serve as an extension of County staff. We’ve led similar programs
from start to finish and understand the day-to-day accountability , documentation, and problem-solving it
takes to keep a long-term program on track.
We understand the significance and trust placed in this program by Jasper County residents. ICE
is prepared to honor that trust by delivering a clear , disciplined, and results-driven approach that
benefits the entire community .
WHY ICE?
` Local Insight, R
egional Strength: With South Carolina-based leadership and an upcoming office
in Jasper County , as well as offices in Bluffton and Beaufort, ICE offers both responsiveness and
depth. The ICE headquarters is located in West Columbia, a short drive from SCDOT headquarters.
` Pr
oven Program Management: We’ve led successful sales tax programs and understand how to
manage large capital efforts across multiple agencies.
` T
ransparent, Trusted Results: We know how to maintain voter confidence by ensuring
accountability , clear communication, and project updates from day one.
We welcome the opportunity to support Jasper County in delivering this generational investment – and
would be honored to serve as your Program Manager. Please do not hesitate to contact myself or Jeff
Buckalew , PE, at jeff.buckalew@ice-eng.com or 843-485-3560 with any questions.
Sincerely ,
Mitchell Metts, PE | Principal-in-Charge
mitchell.metts@ice-eng.com | 804-726-6754
Infrastructure Consulting & Engineering, LLC
2 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC2 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
3
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
PROJECT MANAGER /
MAIN POINT OF CONTACT
Jeff Buckalew, PE ICE
PRINCIPAL–IN–CHARGE /
QA/QC
Mitchell Metts, PE ICE
FINANCIAL
MANAGEMENT
Mitchell Metts, PE ICE
Josh Apsitis ICE
CONSTRUCTABILITY /
VALUE ENGINEERING
Andy Gillis, PE ICE
UTILITY
COORDINATION
Gus Kretschmer ICE
Matthew Cox, EIT ICE
CIVIL ENGINEERING /
PROGRAM MANAGEMENT
SUPPORT
Jenny Germuth, PE ICE
Leland Colvin, PE ICE
LEGEND
Firm Locations
ICE - Infrastructure Consulting & Engineering, LLC
TMS – The Merchant Strategy, Inc. (DBE)
RND – RND Consultants (DBE)
★ Bluffton, SC
★ Greenville, SC
★ West Columbia, SC
★ Charleston, SC
★ N. Charleston, SC
★ Charlotte, SC
ENVIRONMENTAL
Barrett Stone ICE
Cody Connor, PWS ICE
Daniel Koon ICE
RIGHT–OF–WAY
Nathan Midkiff RND
Renee Bergeron RND
PUBLIC INVOLVEMENT /
COMMUNICATION
Renee Mulholland ICE
Henry Phillips ICE
Bree Long ICE
Sharon Merchant TMS
Cheryl Scott TMS
Justin Scott TMS
ASSISTANT PROJECT
MANAGER
Bryan McIlwee, PE ICE
SCDOT
LIAISON
Leland Colvin, PE ICE
PLANNING / CONCEPTUAL
DESIGN
RROOAADDWWAAYY
Aaron Livingston, PE ICE
Clarke Hinson, PE ICE
Alex Nettles, PE ICE
SSTTRRUUCCTTUURREE
Preston Felkel, PE ICE
Ray Spence, PE ICE
Clark Baer, PE ICE
PPAAVVEEMMEENNTT
Jay Thompson, PE ICE
Shilpa Girish, EIT ICE
SSTTOORRMM WWAATTEERR
Alexis McIlwee, EIT ICE
Stuart Timmons, PE ICE
Jordan Bianchi, PE ICE
COST ESTIMATING /
SCHEDULING
Josh Apsitis ICE
Trinaty Geraurd ICE
CONSTRUCTION
ENGINEERING &
INSPECTION
Marc Lemin, PE ICE
Randy Carraway, PE ICE
Todd Steagall, PE, DBIA ICE
ORGANIZATIONAL CHART
Project Team
4
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC4
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
As the Project Manager, Jeff will serve as the day-to-day lead and the main point of contact for Jasper County–
responsible for overseeing the entire Jasper County Sales Tax Program and coordinating all technical,
financial, and stakeholder aspects. He will guide the creation of the Program Management Plan (PMP), lead
coordination with SCDOT and utility providers, and work closely with County departments, consultants, and
the public to keep all projects on schedule and within scope.
Jeff brings decades of relevant experience dealing with public projects and elected officials, managing multi-
disciplinary infrastructure programs/projects, and will ensure that Jasper County’s priorities – transparency ,
timely delivery , and meaningful community input – remain front and center.
AREAS OF EXPERTISE
` Pr
ogram & Capital
Project Management
` R
oadway &
Multimodal Corridor
Improvements
` Stak
eholders
Engagement
& Public
Communication
` AD
A Compliance,
Streetscaping, &
Resiliency Design
` Right-of
-Way , Utility ,
& Environmental
Coordination
` Construction
Oversight & Budget
Management
Main Street Resiliency & Streetscape – Town of Summerville, SC:
Project Manager for corridor design and construction involving road diet, utility
relocation, drainage upgrades, offset pathways, lighting, and wayfinding. Leads
concept development, permitting, and contractor coordination.
ADA Compliance Sidewalks – Town of Bluffton, SC: Managed planning,
design, permitting, and construction for pedestrian safety and ADA upgrades
at 30 locations. Demonstrated his detailed approach to safety , compliance, and
municipal coordination.
Mitchelville Dirt Road Paving – Hilton Head Island, SC: Oversaw conversion
of a dirt road to a pervious asphalt surface with an offset multi-use pathway and
green infrastructure features. Led design and permitting in a residential context
with environmental considerations.
US 278 Multimodal Improvements – Shelter Cove Area – Hilton Head
Island, SC: Managed safety upgrades for motorists, bicyclists, and pedestrians.
Integrated traffic calming, pervious pathways, and signal upgrades while
minimizing utility impacts and preserving heritage trees.
Coligny Area Road & Drainage Improvements – Hilton Head Island, SC:
Oversaw design and construction on a SCDOT–Town partnership corridor.
Managed stakeholder engagement, utility coordination, permitting, ROW
acquisition, and construction.
RELEVANT PROJECT EXPERIENCE
PROJECT MANAGER | MAIN POINT OF CONTACT
Jeff Buckalew, PE
Bluffton, SC | 36 years of infrastructure leadership | 2 years with ICE
jeff.buckalew@ice-eng.com | 843-485-3560
PE: South Carolina #20448
BS, Civil Engineering – WVU Institute of Technology
RESUMES
Professional
5
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
PRINCIPAL-IN-CHARGE | QA / QC
Mitchell Metts, PE
West Columbia, SC | 34 years of experience | 10 years with ICE
mitchell.metts@ice-eng.com | 803-726-6754
PE: South Carolina #17637
BS, Civil Engineering – Clemson University
ROLE ON THE JASPER COUNTY PROGRAM
As Principal-in-Charge and QA/QC, Mitchell will provide high-level program leadership and quality assurance
for the Jasper County Transportation Sales Tax Program. Mitchell brings more than 30 years of experience
managing large-scale transportation programs and previously served as SCDOT’s Director of Preconstruction,
overseeing more than $500 million in project delivery annually . His role on this program includes overseeing
quality control processes, financial oversight, and coordination with Jasper County leadership to ensure fiscal
discipline and technical excellence across all projects.
AREAS OF EXPERTISE
` Pr
ogram
Management &
Strategic Oversight
` Financial
Management & Cost
Control
` Q
A/QC Review &
Design Coordination
` LP
A & SCDOT
Permitting Strategy
` Public Inv
olvement &
Agency Coordination
` Multimodal &
Corridor Program
Delivery
Berkeley County Transportation Sales Tax Program – Berkeley County ,
SC: Provides financial, programmatic, and QA/QC oversight across major
corridor projects, local paving, intersection upgrades, and CEI activities under a
multi-phase sales tax-funded program.
US 17 / Main Road Interchange & Widening – Charleston County , SC:
Leads coordination between Charleston County , SCDOT, and federal agencies
to deliver complex improvements including a grade-separated interchange,
bridge replacement, and multi-use path development.
Clements Ferry Road Widening – Phase II – Berkeley County , SC: Oversaw
design reviews, permitting, funding eligibility , and interagency coordination
for this 4.5-mile capacity project, including cash flow modeling and bridge
construction.
Bridgeway Station Pedestrian Bridge – Greenville County , SC: Served as
liaison to SCDOT and project developer during the design of a new pedestrian
span over I-385, coordinating design exceptions and agency approvals.
Mary Ann Point Road / Main Road Safety Audit – Charleston County ,
SC: Directed a Road Safety Audit and stakeholder engagement process for a
historically high-crash intersection; provided improvement recommendations.
RELEVANT PROJECT EXPERIENCE
6
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC6
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
Leland serves as ICE’s SCDOT Liaison and senior advisor for project management and civil engineering
support. With 28 years of leadership experience at SCDOT — including roles as Deputy Secretary for
Engineering, Chief Engineer for Project Delivery , Director of Construction and Program Manager for
the Charleston Region — Leland brings unmatched insight into SCDOT’s permitting, regulatory compliance,
design criteria, and statewide transportation priorities. On this program, he will assist in navigating agency
approvals, troubleshooting bottlenecks, and aligning local projects with state and federal requirements. He
serves as a key resource for ensuring project delivery stays on schedule and fully compliant.
AREAS OF EXPERTISE
` SCDO
T Standards,
Compliance & QA/
QC
` Statewide
Transportation
Program Oversight
` Pr
ogram/Project
Oversight
` Multi-Agency Pr
oject
Delivery
` Civil Engineering &
Interstate Corridor
Design
` Str
ategic Planning
& Stakeholder
Engagement
` Utility & R
OW
Coordination
SCDOT 10- Y ear Transportation Plan – Statewide, SC: Oversaw the
implementation of SCDOT’s 10- Y ear Plan initiative associated with the passage
of the 2017 Roads Bill. This included the design, environmental/permitting,
right-of-way , and construction. The four components of the 10- Y ear Plan
included Resurfacing, Bridges, Rural Road Safety Program, and Interstate
Program. Under his leadership, the construction program at SCDOT grew from
$1 Billion to $5.5 Billion meeting the initial 10-year plan targets set by the SCDOT
Commission.
I-77 / SC 160 Interchange – Y ork County , SC: Led design oversight for this
innovative offset-direction interchange — the first of its kind in South Carolina —
reducing left-turn conflicts and congestion. The project widened one mile of SC
160 to enhance access from US 21 to Pleasant Road.
US 17 Widening – I-526 to SC 517 – Charleston County , SC:
Oversaw design, ROW acquisition, and permitting for a 2.5-mile corridor
widening. Led stakeholder engagement to address complex impacts to historical
sites, churches, and businesses.
I-26 / Ashley Phosphate Interchange & Widening – Charleston County , SC:
Managed environmental permitting, design coordination, and ROW strategy for
a 5.5-mile corridor widening and major interchange reconstruction including
railroad coordination.
I-520 / Palmetto Parkway Phase II – Aiken County , SC:
Directed all aspects of construction for a 5.5-mile new interstate corridor with
five interchanges, a terminal connection to I-20, and a separated multi-use path.
RELEVANT PROJECT EXPERIENCE
SCDOT LIAISON | PROJECT MANAGEMENT SUPPORT
Leland Colvin, PE
West Columbia, SC | 30 years of experience | 2 years with ICE
leland.colvin@ice-eng.com | 803-429-3352
PE: South Carolina #20218, DBIA Professional, Certified Public Manager
BS, Civil Engineering – University of South Carolina
7
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ASSISTANT PROJECT MANAGER
Bryan McIlwee, PE
Bluffton, SC | 24 years of experience | 1 year with ICE
bryan.mcilwee@ice-eng.com | 854-529-9446
PE: South Carolina #26457
BS, Civil and Environmental Engineering – Virginia Tech
ROLE ON THE JASPER COUNTY PROGRAM
As Assistant Project Manager, Bryan will support the day-to-day coordination, technical oversight, and
stakeholder engagement across all phases of the Transportation Sales Tax Program. Working closely with
Project Manager Jeff, Bryan will help manage the schedule, integrate public feedback into early project
planning, and oversee coordination among subconsultants, design teams, and permitting agencies.
With a strong background in both municipal engineering and capital project delivery , Bryan offers deep insight
into the unique needs of South Carolina’s coastal communities — particularly when it comes to streetscaping,
stormwater infrastructure, and context-sensitive roadway improvements.
AREAS OF EXPERTISE
` Civil Engineering &
Design
` Pr
oject Management
for Local
Government
` Coastal Dr
ainage &
Resiliency
` Multi-use P
athways
& Streetscapes
` Stormw
ater
Permitting
(SCDHEC, SCDOT,
County)
` Hy
drology & Hyraulic
Modeling (XP_
SWMM)
Dr . Mellichamp Drive Streetscape & Drainage Improvements – Bluffton,
SC: Led design, permitting, and construction oversight for a revitalized
commercial corridor featuring pervious parking, stormwater upgrades,
pedestrian enhancements, lighting, and landscaping.
May River Road Streetscape Improvements – Bluffton, SC: Managed full
delivery of this gateway corridor improvement. The project added pervious
parking, new sidewalks, drainage infrastructure, and enhanced streetscaping
along a high-visibility route.
Bridge Street Streetscape Improvements – Bluffton, SC: Oversaw design
of streetscape improvements to a major collector, including parking, pedestrian
access, storm drainage, and aesthetic elements.
Myrtle & Hickory Lane Road & Drainage Improvements – Hilton Head
Island, SC: Managed conversion of private beach roads to public infrastructure
with new pavement sections, storm drainage systems, and ROW coordination.
Gardner Drive Pathway & Drainage – Hilton Head Island, SC: Designed a
multi-use pathway with stormwater improvements, permitting coordination, and
a timber bridge connector for school and community access.
Stormwater Inventory & Modeling – Hilton Head Island, SC: Managed
hydrologic and hydraulic modeling and GIS-based inventory efforts from 2008
to 2016 as part of the Town’s stormwater management program.
Lafayette Major Drainageway Plan Study – Lafayette, CO: As Project
Manager, led a flood hazard and stormwater resiliency study across a
5.65-square-mile area to develop alternatives and enhance safety , water quality ,
and community aesthetics.
RELEVANT PROJECT EXPERIENCE
8
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC8
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
Alexis supports the Jasper County Transportation Sales Tax Program as a Water Resource Engineer focused on
stormwater management and local project coordination. With nearly a decade of multidisciplinary experience
in stormwater modeling, drainage infrastructure design, urban planning, and municipal project delivery , she
offers strong technical and planning support during the scoping, pre-design, and permitting stages. Alexis’s
experience with government agencies–including project management roles at the Town of Hilton Head Island–
enhances the team’s ability to respond to complex site constraints and regulatory expectations.
AREAS OF EXPERTISE
` Stormw
ater Modeling
& Drainainge Design
` Urban & Spatial
Planning
` Civil Site Design
& Infrastructure
Upgrades
` GIS / Data
Management
` Stormw
ater
Permitting & FEMA
Coordination
` Stak
eholder
Engagement & Multi-
Agency Review
Stormwater Inventory & SWMM Modeling – Hilton Head Island, SC: Led
hydrologic and hydraulic modeling for over 1,300 acres in the Palmetto Hall/
Mitchelville area. Managed project from procurement through implementation,
incorporating tidal influences, hurricane drainage strategies, and system
performance evaluations.
Cordillo Courts Drainage Improvements – Hilton Head Island, SC: Analyzed
and designed drainage system upgrades for a flood-prone condominium
community , including detention basin regrading and new conveyance
infrastructure.
Cobia Court & Wildhorse Court Drainage Upgrades – Hilton Head Island,
SC: Redesigned stormwater systems to resolve localized flooding, improve
outfall culvert capacity , and restore channel flow capacity through residential
corridors.
Belleview Avenue & Clarkson Street Drainage – Greenwood Village, CO:
Designed storm sewer rehabilitation and in-situ lining for urban infrastructure.
Coordinated construction staging, street closures, and utility adjustments.
Goldsmith Gulch Drainage Stabilization – Greenwood Village, CO:
Managed floodplain channel stabilization involving boulder edging and erosion
control at a utility conflict site, in partnership with the Mile High Floodplain
District.
16th Street Pedestrian Mall Drainage Improvements – Denver , CO:
Proposed urban drainage improvements for high-traffic corridor using 2D
modeling. Designed water quality treatment devices integrated with pedestrian
facilities.
RELEVANT PROJECT EXPERIENCE
WATER RESOURCE ENGINEER / PROJECT MANAGEMENT SUPPORT
Alexis McIlwee, EIT
Bluffton, SC | 9 years of experience | 1 year with ICE
alexis.mcilwee@ice-eng.com | 854-529-9434
EIT: South Carolina #22318
BS, Environmental Engineering – Michigan Technological University
9
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
TRANSPORTATION ENGINEER / PROJECT MANAGEMENT SUPPORT
Jenny Germuth, PE
Charleston, SC | 12 years of experience | 5 years with ICE
jenny .germuth@ice-eng.com | 843-576-3946
PE: South Carolina #32444
BS, Civil Engineering – Clemson University
ROLE ON THE JASPER COUNTY PROGRAM
Jenny will support the Jasper County Transportation Sales Tax Program as a Transportation Engineer,
bringing deep experience in roadway design, project coordination, and civil site development. As a proven
team leader across sales tax-funded programs, Jenny will assist in scope development, utility coordination,
design review , stakeholder outreach, and documentation. Her proactive project management style and deep
technical knowledge will help ensure consistency , cost-efficiency , and smooth transitions from planning
through permitting.
AREAS OF EXPERTISE
` R
oadway & Civil Site
Design
` T
ransportation Sales
Tax Program Support
` Utility Coor
dination &
Railroad Interface
` P
ermitting (SCDOT,
NEPA, Local
Agencies)
` Construction
Documentation &
QA/QC
` Multidisciplinary
Project Management
Berkeley County Sales Tax Program Management – Berkeley County ,
SC: Managed projects within the county’s sales tax program including Henry
E. Brown Jr. Boulevard Phase 2, Foster Creek at Tanner Ford, and various Dirt-
to-Pave projects. Oversaw financial tracking, stakeholder engagement, utility
and railroad coordination, and standardized design processes for consistent
program delivery .
Henry Brown Boulevard Widening Phase 2 – Berkeley County , SC: Led
preliminary design, permitting, ROW plans, and multi-agency coordination
for this corridor expansion project. Designed multi-use paths, medians, and a
signalized intersection near an active rail line.
Main Road Widening Segment C (Bohicket Road) – Charleston County ,
SC: Provided planning, alternative analysis, and preliminary design for this
NEPA-aligned roadway widening, preparing to serve as Lead Roadway Engineer
in later phases.
Carolina Crossroads Phase 1 – Richland County , SC: Coordinated railroad
approvals, encroachment permits, and utility adjustments for this high-profile
interstate interchange and widening project.
US 17 at Main Road Interchange & Widening – Charleston County ,
SC: Supports EIS process, ROW design, and engineering plans for a $195M
improvement project that includes flood mitigation, shared-use path design, and
SCDOT coordination.
England Road Dirt-to-Pave – Berkeley County , SC: Oversaw design,
permitting, and construction documentation for rural roadway paving under the
sales tax program.
RELEVANT PROJECT EXPERIENCE
10
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC10
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
As CEI Oversight, Marc will oversee day-to-day construction administration and inspection operations
throughout the Jasper County Transportation Sales Tax Program. He will manage on-site field teams,
coordinate with contractors and County departments, lead pre-construction meetings, and maintain QA/QC
documentation. Marc’s responsibilities also include overseeing job-site materials testing, tracking contractor
compliance with technical specifications, and ensuring adherence to safety and environmental requirements.
With over 30 years of field experience, Marc brings a seasoned, boots-on-the-ground perspective to ensure
construction runs smoothly , transparently , and in alignment with the County’s expectations for quality and
accountability .
AREAS OF EXPERTISE
` CEI Pr
ogram
Management & Field
Oversight
` Utility Coor
dination &
Field Engineering
` SCDO
T Inspection
Standards &
Materials Testing
` R
oadway ,
Intersection,
& Drainage
Improvements
` Submittal Ov
ersight,
RFIs, & Construction
Documentation
` On-site Dispute
Resolution &
Stakeholder
Coordination
SCDOT CE&I On-Call Services – District 6, SC: CEI Manager overseeing
inspection scheduling, issue resolution, and documentation across multiple
projects in Jasper, Beaufort, and surrounding counties.
SC 170 Widening – Beaufort County , SC: Project Manager for $15M widening
effort funded through local sales tax. Led CEI efforts, managed contractor
activities, and coordinated environmental protections for wetland crossings.
I-95 Business Loop Streetscape – Colleton County , SC: Served as CEI
Project Manager for 4.45 miles of corridor improvements including resurfacing,
sidewalk installation, and drainage work. Collaborated closely with County staff
during construction.
Boundary Street Redevelopment – Beaufort County , SC: Project Principal
for this $18M downtown revitalization project. Oversaw constructability reviews,
utility relocation coordination, and transition to undergrounding of utilities.
Orangeburg Road Roundabout – Dorchester County , SC: Project Manager
for intersection conversion and safety improvements. Led submittal and RFI
review , field inspections, and stakeholder coordination.
RELEVANT PROJECT EXPERIENCE
CEI OVERSIGHT – FIELD MANAGEMENT, DAIL Y CONSTRUCTION
ADMINISTRATION
Marc Lemin, PE
Charleston, SC | 30 years of experience | 18 years with ICE
marc.lemin@ice-eng.com | 843-576-6672
PE: South Carolina #27012
BS, Civil Engineering – Virginia Tech
11
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
CONSTRUCTION ADMINISTRATION ENGINEER
Randy Carraway, PE
Greenville, SC | 36 years of experience | 12 years with ICE
randy .carraway@ice-eng.com | 803-227-4056
PE: South Carolina #19586
BS, Civil Engineering – North Carolina State University
ROLE ON THE JASPER COUNTY PROGRAM
As a senior member of ICE’s Construction Administration team, Randy brings over three decades of experience
in bridge, roadway , and large-scale infrastructure construction. He will support construction oversight, quality
assurance, and field engineering across the County’s sales tax program. With a career that spans design, CEI,
and materials management, Randy offers rare insight into constructability , plan compliance, and contractor
coordination on complex, multi-phase projects.
Randy will serve as an embedded resource during preconstruction reviews and be on-site to support resolution
of design conflicts, submittals, and construction documentation—ensuring County expectations are met from
groundbreaking through final acceptance.
AREAS OF EXPERTISE
` Construction
Engineering &
Inspection (CEI)
` Interstate & Bridge
Program Delivery
` SCDO
T & FWHA
Construction
Compliance
` Design-Build
Program
Coordination
` Utility R
elocation,
Plan Reviews & Site
Audits
` Materials T
esting
& Documentation
Standards
I-85 over Rocky Creek Bridge Replacement – Greenville, SC: Project
Manager for multi-stage bridge replacement involving box culvert removal, new
elevated lanes, and coordination with FHWA, SCDOT, and inspectors.
I-85/I-385 Gateway Interchange Improvements – Greenville, SC:
Deputy Resident Engineer and Materials Manager on this $231M design-build
interchange project. Oversaw all sampling, material certifications, SCDOT
coordination, and compliance tracking across ten bridge structures and multiple
roadways.
Palmetto Parkway Phase II – North Augusta, SC: Project Manager for this
6.5-mile interstate extension completing the I-520 loop. Led a 16-person CEI
team managing 16 bridges, 7 culverts, and over 6 million CY of earthwork.
SC 35 – 12th Street Extension – Cayce, SC: Construction Engineer on a major
bridge and roadway project. Responsibilities included daily documentation,
utility coordination, compliance audits, and contractor pay estimates.
MoDOT Safe and Sound Bridge Replacement Program – Missouri
(Statewide): Construction Engineer for one of the largest bridge replacement
programs in the U.S. Oversaw documentation and coordination for over 370
bridge projects with a 45-day average build time.
RELEVANT PROJECT EXPERIENCE
12
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC12
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
Serving as CEI Program Manager, Todd will lead strategic oversight and program-wide coordination across all
active construction packages. He will guide compliance with SCDOT standards, federal regulations, and QA/
QC procedures while supporting field staff with escalation needs and providing expert input on permitting or
materials-related decisions. Todd will also oversee construction documentation, pay application verification,
and change order negotiation to ensure fair pricing and responsible cost control. With a statewide background
managing SCDOT’s $3B construction program, Todd brings the experience and systems needed to ensure the
County’s CEI efforts are cohesive, consistent, and fully compliant from the field to final acceptance.
AREAS OF EXPERTISE
` CEI Pr
ogram
Management &
Inspection Oversight
` Statewide
Construction
Program
Administration
` Q
A/QC Compliance
& Materials
Documentation
` SCDO
T/FHWA
Specifications
& Change
Management
` Stak
eholder
Coordination &
Dispute Resolution
Mossy Oaks Drainage Project – City of Beaufort: Construction Manager on
this multi-jurisdictional watershed improvement. Leads CEI, pay application
review , and construction documentation.
Town of Hilton Head Island IDC: Provides full CEI oversight across several
capital improvement projects.
Gadsden Loop Sidewalk Project – Colleton County , SC: Managed CEI
services for a CDBG-funded pedestrian safety project. Oversaw utility relocation,
contractor coordination, and pay applications.
Port Access Road – Charleston, SC: Directed CEI and construction
coordination for this $220M design-build project connecting I-26 to the SC Ports
Authority terminal.
I-26 Widening & Bridge Replacements – Lexington/Calhoun Counties,
SC: Oversaw delivery of 20 miles of widening and bridge replacements. Handled
QA/QC, contractor coordination, and conflict resolution.
Arthur Ravenel Jr . Bridge (Cooper River): Served as Quality Management
Engineer, overseeing inspections and documentation on one of South Carolina’s
largest bridge projects.
RELEVANT PROJECT EXPERIENCE
CEI PROGRAM MANAGEMENT–COMPLIANCE STRATEGY,
CONSTRUCTION CONTROLS
Todd Steagall, PE
West Columbia, SC | 35 years of experience | 6 years with ICE
todd.steagall@ice-eng.com | 803-227-4056
PE: South Carolina #17651
BS, Civil Engineering – Clemson University
13
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ENVIRONMENTAL MANAGER
Barrett Stone
West Columbia, SC | 27 years of experience | 9 years with ICE
barrett.stone@ice-eng.com | 803-746-7147
MS, Environmental Health – University of South Carolina
BS, Wildlife Biology – Clemson University
ROLE ON THE JASPER COUNTY PROGRAM
As Environmental Manager, Barrett will lead all environmental tasks for the program–ensuring compliance
with NEPA, Section 404/401 permitting, and environmental documentation required to support federally
and locally funded infrastructure projects. Barrett will coordinate early scoping, environmental screening,
stakeholder engagement, and agency coordination to keep projects on track, especially those impacting
wetlands, protected species habitats, and sensitive coastal zones. With nearly three decades of experience
across South Carolina and the Southeast, Barrett is uniquely positioned to help Jasper County balance growth
and conservation. His oversight will reduce risk, streamline permitting, and ensure that Jasper County's
Greenbelt and infrastructure priorities are planned with resilience and responsibility .
AREAS OF EXPERTISE
` NEP
A
Documentation
& Environmental
Compliance
` Section 404/401
Permitting & Wetland
Delineations
` Envir
onmental
Justice & Public
Involvement
` Thr
eatened &
Endangered Species
Coordination
` Construction Phase
Environmental
Oversight
` DO
T & FAA
Environmental
Assessments
I-26 Widening, MM 172–187 – Dorchester & Berkeley Counties, SC
(SCDOT): Serves as Environmental Manager for NEPA compliance and Section
404 permitting. Oversees wetland delineations, document prep, and agency
coordination on this major interstate widening and bridge replacement effort.
Carolina Crossroads Phases 1 & 2 – Richland & Lexington Counties, SC
(SCDOT): Leads NEPA reevaluation, permitting strategy , and construction-
phase compliance support for this $1.7B interchange modernization. Coordinates
all environmental documentation and supports public outreach efforts.
Pathways Project – Beaufort County , SC: Environmental Manager overseeing
documentation and permitting for more than 16 miles of pedestrian pathways.
Supported project visioning aligned with the County’s long-term mobility and
environmental goals.
Fred Nash Boulevard Widening & Extension – Horry County , SC:
Environmental Manager providing NEPA documentation and 404/401 permitting
to support widening and access to a proposed economic development corridor.
I-85 Widening & Bridge Replacements (GDOT) – Jackson County , GA:
Led all environmental tasks on a 6.5-mile corridor improvement including
major bridge construction. Responsible for NEPA documentation and agency
engagement.
US 17 & Main Road Interchange EIS – Charleston County , SC: Environmental
Permitting Lead responsible for wetland and critical area permitting for major
interchange and flood-mitigation upgrades. Supported public engagement and
alignment alternatives.
RELEVANT PROJECT EXPERIENCE
14
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC14
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
As Utility Coordination Lead, Gus brings more than three decades of experience managing complex utility
coordination on major transportation programs across South Carolina and the Southeast. He will lead all utility
coordination activities for the Jasper County Transportation Sales Tax Program, including conflict analysis,
utility relocation strategies, in-contract adjustments, and Subsurface Utility Engineering (SUE) oversight.
Gus has successfully led utility coordination on over 100 projects—including large-scale design-build and
sales-tax funded initiatives — and is known for preventing costly delays through early engagement and
persistent follow-up. He will ensure all utility work is seamlessly integrated into the program schedule and
budget.
AREAS OF EXPERTISE
` Utility Coor
dination &
Adjustment Planning
` Subsurf
ace Utility
Engineering (SUE)
` Design-Build &
In-Contract Utility
Strategies
` Utility Conflict Matrix
& Cost Estimating
` R
ailroad
Coordination (CSX,
NS, short lines)
` Utility Agr
eements &
MOAs (ACT36 / BILL
401)
I-26 Widening (MM 85–101) – Richland, Lexington & Newberry Counties,
SC: Utility Relocation Manager overseeing four utility coordinators and 18 utility
owners. Managed utility strategy , conflict resolution, and in-contract relocation
agreements for water and sewer. ($465M project)
Carolina Crossroads Phases 1 & 2 – Richland & Lexington Counties,
SC: Utility Coordinator and Manager for both phases of this $1.7B interchange
modernization. Led SUE planning, stakeholder coordination, and railroad utility
crossing solutions with CSX and NS.
Project Brooklyn – BMW Spartanburg – Greenville County , SC: Utility
Coordinator for new two-lane bridge and road system serving full-size truck traffic
across I-85. Managed relocations under both SCDOT and BMW specifications.
US 21 over Harbor River Bridge Replacement – Beaufort County , SC: Led
utility planning and final relocation coordination for this 3,353-foot-long fixed-
span bridge over a tidal channel.
I-95 Widening & Pavement Rehab (MM 13–20) – Lumberton, NC: Utility
Coordinator for resilience-focused interstate upgrade. Developed preliminary
and final utility coordination plan to accommodate interchange reconstruction
and flood resilience measures.
SCDOT Utility Coordination On-Call Contract – Statewide, SC: Served as
statewide Utility Coordination Manager for multiple safety and widening projects,
including in Lexington, Horry , and Florence Counties. Oversaw agreements,
relocation plans, and agency coordination.
RELEVANT PROJECT EXPERIENCE
UTILITY COORDINATION LEAD
Gus Kretschmer
Charlotte, NC | 34 years of experience | 12 years with ICE
gus.kretschmer@ice-eng.com | 704-247-1754
Legal Aspects of Easements – IRWA Certification
BS, Parks, Recreation and Business – Appalachian State University
15
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
ROLE ON THE JASPER COUNTY PROGRAM
Josh will support the Jasper County program by overseeing financial controls and schedule performance
tracking. His expertise in cost forecasting, CPM schedule development, and construction phasing will enhance
Jasper County’s ability to monitor budgets, track milestones, and avoid risks across dozens of active projects.
With a decade of experience managing high-profile, multimillion-dollar infrastructure efforts, Josh ensures
accountability , transparency , and timely delivery through integrated reporting and hands-on coordination with
County staff, contractors, and stakeholders.
AREAS OF EXPERTISE
` Pr
ogram Budgeting
& Financial Controls
` CPM Schedule
Management
` Claims & Risk
Analysis
` Construction Cost
Forecasting
` Pr
ogress Tracking
& Earned Value
Reporting
` Construction
Phasing & Field
Coordination
Berkeley County Transportation Sales Tax Program – US 176 Widening –
Berkeley County , SC: Managed monthly schedule reviews and risk assessments
for the 5.6-mile widening of US 176. Tracked progress against 30K+ LF of utility
relocations. Provided delay mitigation strategies and financial forecasting.
Carolina Crossroads Phases 1 & 2 – Richland & Lexington Counties,
SC: Oversaw baseline schedule development, shop drawing review (MSE
walls, girders), and contractor coordination on $1.7B multi-phase interstate
improvement project. Led plan reviews and CPM schedule oversight.
Glenn McConnell Parkway Widening (CE&I Services) – Charleston, SC:
Tracked contractor progress, verified submittals, and managed CPM schedule
for 2-mile widening with sidewalks, multi-use paths, and intersection upgrades.
Supported pay estimate accuracy and milestone validation.
Henry Brown Boulevard Widening Phase 2 – Berkeley County , SC: Led
schedule reviews for corridor expansion with medians, multi-use paths, and
major intersection improvements. Aligned progress tracking with construction
phasing and field operations.
Main Road Corridor Segment A – Charleston County , SC: Assisted with
timeline validation and stakeholder coordination for the Stono River crossing,
shared-use path, and roundabout installation. Conducted site visits and
discrepancy analysis.
East/West Container Y ard Expansion – Inland Port Greer – Greer , SC:
Managed phasing plan review and subconsultant compliance on $30M terminal
storage upgrade. Kept Port Authority appraised of milestone performance.
Assisted with submittal tracking and cost updates.
RELEVANT PROJECT EXPERIENCE
FINANCIAL MANAGEMENT SUPPORT / PROJECT CONTROLS
Josh Apsitis
West Columbia, SC | 12 years of experience | 3 years with ICE
josh.apsitis@ice-eng.com | 803-386-8952
BS, Civil and Environmental Engineering – The Citadel
16
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC16
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
RESERVES
Firm
ROADWAY ENGINEER
Aaron Livingston, PE
West Columbia, SC | 22 years of experience | 12 years with ICE
aaron.livingston@ice-eng.com | 803-227-4064
PE: South Carolina #26136
MBA, Entrepreneurship – Clemson University
BS, Civil Engineering – Clemson University
STRUCTURAL ENGINEER
J. Preston Felkel, PE
West Columbia, SC | 27 years of experience | 9 years with ICE
preston.felkel@ice-eng.com | 803-227-4065
PE: South Carolina #26987
MS, Structural Engineering – University of South Carolina
BS, Civil Engineering – University of South Carolina
PAVEMENT ENGINEER
Jay Thompson, PE
West Columbia, SC | 24 years of experience | 2 years with ICE
jay .thompson@ice-eng.com | 803-881-2711
PE: South Carolina #27041
MS, Civil Engineering – Clemson University
BS, Civil Engineering – Clemson University
VALUE ENGINEERING
Andy Gillis, PE
West Columbia, SC | 28 years of experience | 10 years with ICE
andy .gillis@ice-eng.com | 803-227-4051
PE: South Carolina #23517
BS, Civil Engineering – University of South Carolina
17
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
PUBLIC INVOL VEMENT / COMMUNICATION
Renee Mulholland
N. Charleston, SC | 21 years of experience | 6 years with ICE
renee.mulholland@ice-eng.com | 843-576-6683
MS, Earth and Environmental Resource Management – University of South Carolina
BS, Marine Science – University of South Carolina
Firm Reserves and Backup Personnel Resources
ICE has the staffing capacity and systems in place to support Jasper County’s Transportation Sales Tax
Program at every stage.
Our team structure includes backup personnel across key disciplines to ensure that if staffing adjustments are
needed, we can transition coverage quickly and without disruption. We maintain a strong roster of engineers,
inspectors, environmental planners, and program management staff who are familiar with our processes and
ready to step in when needed.
With experienced personnel based across South Carolina and built-in staffing flexibility , ICE is committed to
providing steady , consistent service throughout the life of the program.
Jasper County will have the benefit
of not only the core project team but
also additional qualified staff who
can support the program if workload
shifts, schedules accelerate, or other
needs arise.
Primary Point-of-Contact:
Jeff Buckalew , PE | Project Manager
jeff.buckalew@ice-eng.com
843-485-3530
ROW AGENT / ASSISTANT PROJECT MANAGER
Renee Bergeron
Renee supports ROW acquisition, relocation, and engineering review efforts. In
addition to leading relocation logistics and document preparation, she assists with
design plan evaluations, schedule tracking, and public outreach. She brings key
expertise in Environmental Justice (EJ) community coordination and multi-agency
collaboration.
18
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC18
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
PUBLIC INVOL VEMENT & STRATEGIC COMMUNICATIONS
The Merchant Strategy, Inc. (TMS)
West Palm Beach, FL | Fort Lauderdale, FL | Little River, SC
20+ years of experience
info@themerchantstrategy .com | www .themerchantstrategy .com
Certifications: DBE/ACDBE (FL & SC DOTs) MWBE (Charleston, SC), SWBE (Palm
Beach County), CBE (Broward County)
ROLE ON THE JASPER COUNTY PROGRAM
TMS will serve as Jasper County’s Public Involvement Lead, guiding all stakeholder and community outreach
for the Transportation Sales Tax Program. Their team will lead the development of a comprehensive Public
Involvement Plan (PIP), manage a dedicated project website and social media presence, coordinate
stakeholder workshops, produce visual and print outreach materials, and operate a 24/7 hotline. Their long-
standing experience with SCDOT, municipal governments, and public-private partnerships makes them
uniquely equipped to deliver proactive, strategic communications and foster transparency throughout the life
of the program.
OPERATIONS AND PROJECT MANAGER
Cheryl Scott
Cheryl, originally from Detroit, leads the execution of TMS’s outreach plans, managing
daily communications, stakeholder logistics, hotline operations, and community-facing
materials. With over 20 years of administrative and management experience, she also
supports project scheduling, contract administration, and internal coordination. Cheryl
plays a central role in translating complex engineering information into clear public
messaging and is instrumental in office-wide decision-making and project continuity .
MARKETING AND PUBLIC INVOL VEMENT SPECIALIST
Justin Gonzales, MBA
Justin supports digital communications, social media management, public meeting
coordination, and the visual design of outreach materials. Leveraging his legal and
marketing background, he crafts cohesive, professional messaging across platforms,
ensuring strong stakeholder engagement and brand alignment. He also brings
experience in executing integrated marketing campaigns, managing multi-channel
strategies, and analyzing ROI to maximize impact and budget efficiency .
SUBCONSUL TANTS & PERSONNEL
Organization of
19
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
PRESIDENT & PUBLIC INVOL VEMENT DIRECTOR
PRESIDENT & PUBLIC INVOL VEMENT DIRECTOR
Sharon J. Merchant
30+ years of experience in Public & Government Relations | 19+ years in Public
Involvement
sharon@themerchantstrategy .com
BS, International Affairs – Florida State University
As a four-term Florida State Representative and founder of TMS, Sharon provides high-level leadership,
strategic oversight, and quality assurance on all outreach activities. She has led public involvement for some of
the region’s most sensitive and high-visibility infrastructure projects–delivering consensus–building strategies,
stakeholder coordination, and transparent communication on behalf of cities, counties, and state agencies.
AREAS OF EXPERTISE
` Public Inv
olvement
Planning (PIP & CAP)
` Stak
eholder &
Government Liaison
` Q
A/QC of Outreach
Materials
` Media Str
ategy & Crisis
Response
` Constituent
Communication
Management
` Public Meeting
Facilitation & Oversight
RELEVANT PUBLIC INVOLVEMENT EXPERIENCE
KCI Technologies – City of Delray Beach ADA Sidewalk Project
Relevance: County/municipal sidewalk improvement initiative, similar
in scope to pedestrian enhancements often included in transportation
programs.
Stantec – FDOT D4 SR-91/I-95 at Hypoluxo Road Diverging Diamond
Interchange
Relevance: Highway/interchange project, coordination with state DOT
and stakeholders, includes QA/QC on major transportation initiatives.
Stanley Consultants – I-95/SR-9 PD&E Study (Martin & St. Lucie
Counties)
Relevance: Public meetings, collateral development, and regional
public outreach for an interstate corridor — aligns with SCDOT-level
infrastructure efforts.
WGI – FDOT/Palm Beach County Off-System Bridge Replacements
Relevance: Public outreach for local bridges — a transportation-focused,
county-coordinated infrastructure improvement effort.
Erdman Anthony – FDOT Projects in West Palm Beach
Relevance: Coordinated with TPO, SFWMD, FEC, and engineering
teams; multi-agency and stakeholder engagement reflects complex
program dynamics.
City of West Palm Beach – Washington Road Utility and Stormwater
Improvements
Relevance: Utility and drainage-focused infrastructure improvements with
city coordination — parallels county-level utility and roadway projects.
20
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC20
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS
RIGHT-OF-WAY AQUISITION AND RELOCATION SERVICES
RND Consultants
Charleston, SC
8+ years of experience
info@rndconsultants.com
Certifications: DBE/SBE
ROLE ON THE JASPER COUNTY PROGRAM
RND Consultants will serve as the Program’s Right-of-Way (ROW) and Relocation Services Lead, providing
full-scale acquisition, relocation, and coordination services across all project phases. Their team brings
deep, hands-on experience navigating South Carolina’s ROW requirements, managing complex property
negotiations, and supporting SCDOT acquisition compliance. With expertise in relocation services, eminent
domain coordination, title and appraisal oversight, and community engagement in Environmental Justice
(EJ) areas, RND will ensure a seamless and community-minded ROW process for Jasper County .
PROJECT MANAGER / ROW AGENT
Nathan Midkiff
Charleston, SC | 14 years of experience | SCDOT & Municipal ROW Expertise
Memberships and Certifications: National Transit Institue-FTA Real Estate
Requirements | IRWA-RW/RAC Candidate | International Right-of-Way Association
ROLE ON THE JASPER COUNTY PROGRAM
Nathan leads RND’s Right-of-Way team for Jasper County , bringing deep expertise in acquisition planning,
property negotiation, and Uniform Act compliance. He has managed relocations and acquisitions across South
Carolina and Massachusetts and is experienced with full/partial fee acquisitions, easements, condemnation
support, and relocation claims.
AREAS OF EXPERTISE
` Eminent Domain
& Relocation
Coordination
` R
eal Estate
Negotiation
& Acquisition
Strategy
` R
OW Plan Review
& Property Impact
Minimization
SCDOT I-526 Lowcountry Corridor WEST – Charleston, SC: Managed 95
acquisitions and 50 relocations; coordinated with title, appraisal, and legal
teams; handled relocation claims and community engagement
SCDOT I-73 Segment A6M – Marion County , SC: Led acquisition of 11 tracts;
developed preliminary ROW estimates and acquisition documents.
SCDOT Georgetown Roundabout – Murrells Inlet, SC: Managed acquisition
of 9 parcels; completed appraisals, title reviews, and negotiations.
RELEVANT PROJECT EXPERIENCE
ICE’s Capabilities & Services
` Ar
chitecture
` A
viation Engineering
` Bridge/Structur
al Design
` Construction Management
/ CE&I
` Design-Build Engineering
` Envir
onmental Services
` F
oundation Testing
` Geotechnical Engineering
` Gr
ant Writing
` Hy
drology / Hydraulic
Design
` Intelligent T
ransportation
Systems (ITS)
` Materials T
esting Services
(Lab)
` P
avement Engineering
` P
ort Engineering / Civil
Site Design
` Public R
elations
` R
ailroad Services
` R
oadway Design
` T
raffic Engineering
` Utility Coor
dination
` Surv
eying
SCDOT US 21 Harbor River Bridge – Design-Build
21
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
At ICE, our mission is simple: to deliver infrastructure solutions that
serve communities today and stand the test of time. Founded in
2005–originally as Coleman–Snow Consultants–we’ve grown into a
multidisciplinary engineering firm known across the Southeast for our
ability to lead complex projects and programs, anticipate challenges,
and build long-term trust with our clients.
With over 580 professionals, including 160 licensed engineers and
specialists, ICE brings the leadership, technical depth, and real-world
experience needed to guide multi-year capital improvement efforts
from early planning through final construction. From our 23 offices
across eight states, we support transportation programs of all sizes–
and we’re proud to bring that strength home to South Carolina.
ICE will soon be opening an office in Jasper County , further bolstering
our local presence to strengthen our ability to support the County’s
Transportation Sales Tax Program with on-the-ground responsiveness
and ongoing collaboration.
What sets ICE apart is our ability to integrate services under one roof–
offering a single-source solution for program management. Our Team
includes specialists in:
` Pr
ogram and financial management
` T
ransportation project planning and prioritization
` Envir
onmental permitting and NEPA documentation
` Utility coor
dination and conflict resolution
` Land surv
eying and right-of-way verification
` Construction management and inspection services
` Public inv
olvement and strategic communications
& CAPABILITIES
Range of Services
At ICE, we don’t just manage projects—we manage progress. From
early stakeholder coordination to construction phasing and financial tracking, we understand what it takes
to lead high-profile, sales tax-funded programs that demand transparency , efficiency , and public trust.
For Jasper County , that means a team that is not only highly capable but also highly accessible—bringing the
structure, insight, and hands-on leadership needed to deliver this generational investment with accountability
to the community .
22
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC22
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
Managing a program of this scale requires more
than technical capability–it demands the ability to
navigate regulatory requirements, collaborate with
state agencies, and solve problems before they
become delays. That’s where ICE brings exceptional
value to Jasper County .
We do not just know SCDOT–we have been a
part of it. Several members of ICE’s leadership
team previously held high-ranking positions within
the South Carolina Department of Transportation,
including Deputy Secretary of Engineering, Director
of Construction, Director of Preconstruction, and
Regional Production Engineer. This firsthand
experience and strong relationships with current
staff gives our team an insider’s understanding of
SCDOT’s processes, permitting pathways, quality
standards, and decision-making protocols–allowing
us to move faster, with fewer obstacles.
Our in-house SCDOT liaisons understand how
to coordinate effectively at both the district and
headquarters level. From permit applications and
LPA documentation to design exceptions and
construction coordination, ICE knows how to engage
the right people, at the right time, with the right
information. The result: fewer bottlenecks, clearer
expectations, and accelerated progress.
ICE has led and contributed to dozens of SCDOT
projects across the state, including:
` SC27
7 Flyover Ramp Bridge Replacement
` I-7
7 Widening and Bridge Replacements
` SC 901 Bridge o
ver Rocky Creek
` Butler
Road Improvements
` I-
85 Rocky Creek Bridge Replacement
` I-
26 Widening (Richland & Lexington
Counties)
` I-
95/I-26 Interchange (Orangeburg &
Dorchester Counties)
By preempting delays, streamlining submittals, and
aligning with SCDOT standards from the start, ICE
ensures that local projects meet state expectations
without compromise. For Jasper County , that means
a trusted partner who can keep the program moving–
on schedule, in compliance, and with confidence.
Strategic Partnership with SCDOT: Accelerating delivery through experience
ICE has consistently delivered above-standard performance on the I-26 contract. The Team has met all
deliverable deadlines and produced high-quality work. Project Manager Metts and Design Manager Kicklighter
have shown excellent responsiveness, and the Public Information Meeting was well-planned and effectively
executed. The Team has done a strong job utilizing key staff to meet project demands, and PM Metts continues
to lead at a high level. We look forward to continued success on this project.
SC277 Flyover Ramp Bridge Replacement
Our Process.
YOUR PROGRESS.
What to Expect from ICE:
Clear Planning from Day One
` T ailored project scoping and risk-based
planning
` Community-inf
ormed solutions that
reflect Jasper County’s priorities
` T
ransparent, milestone-driven program
roadmap
Strategic Oversight that Delivers
` Full-scope pr ogram coordination, from
pre-design through construction
` Pr
oactive issue tracking, schedule
alignment, and quality control
` Financial stew
ardship with real-time
tracking and clear reporting
Public Trust Built Through Partnership
` Engaging communications and
community outreach
` Seamless collabor
ation with County
staff and stakeholders
` Experienced leadership that listens,
adapts, and delivers results
23
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
Over the past decade, ICE has delivered full-service
program management for multi-million-dollar
transportation sales tax initiatives across South
Carolina–demonstrating not only our ability to lead,
but to do so with fiscal accountability , stakeholder
transparency , and a relentless focus on timely , on-
budget delivery . These programs have included
planning, scheduling, financial oversight, right-of-way
and utility coordination, and hands-on management of
capital infrastructure improvements.
We’ve supported Berkeley , Lancaster, and Charleston
counties through every stage of their sales tax
programs—earning a reputation as a trusted, long-
term ally to public agencies invested in infrastructure
improvement. Whether it’s collaborating with
county finance departments to shape project-level
budgets, coordinating early utility relocations to
avoid delays, or tracking real-time progress across
dozens of active job sites, ICE brings the structure,
staffing, and systems required to manage complex
transportation programs with clarity and control.
Since 2011, ICE has played a central role in delivering
over a dozen capital projects involving design,
permitting, CEI, LPA compliance, and agency
coordination—demonstrating our strength as a hands-
on leader in program execution and delivery . Combined
with our deep ties to SCDOT, this real-world experience
positions us to guide Jasper County’s program from
vision to reality .
Why This Matters to Jasper County
Our past experience gives us direct insight into what
makes programs succeed–or stall. We’ve learned how
to build early momentum, navigate funding cycles, and maintain the public’s trust through visible progress,
transparency , and proactive communication. ICE will bring this experience to Jasper County–not only to
manage projects, but to help the County manage a legacy investment and long-term community impact.
EXPERIENCE
Prior
Strategic Partnership with SCDOT: Accelerating delivery through experience
24
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC24
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
SALES TAX PROGRAM
Berkeley County
Client: Berkeley County
Y ears Active: 2015–Present
Program Value: $587 ,000,000
Completed On-Time/Budget: Ye s
Program Overview: Since 2015, ICE has served as the Program
Manager for Berkeley County’s voter-approved Transportation
Sales Tax Program, leading the planning, management, and
implementation of a wide range of capital improvement projects.
These include major road widenings, intersection upgrades,
resurfacing efforts, and dirt-to-pave conversions that enhance
safety , reduce congestion, and support regional growth.
ICE provides full life-cycle support–from financial planning
and consultant procurement to construction oversight and
community outreach. We manage budgets and schedules,
perform QA/QC reviews, coordinate utilities and right-of-way ,
assist with permitting, and ensure SCDOT LPA compliance.
Our team supports Berkeley County across all phases of project
delivery and facilitate transparent, efficient progress across
dozens of active projects.
Key Services Provided: Program and Financial Management;
Scope and Fee Negotiation and Consultant Procurement; QA/
QC Reviews and Constructability Oversight; ROW and Utility
Coordination; Permitting and Environmental Compliance;
Public Involvement and FOIA Support; CEI and Construction
Oversight; Bid Phase Support and Value Engineering
Key Personnel Involved: Mitchell Metts, PE; Marc Lemin, PE;
Todd Steagall, PE; Jenny Germuth, PE; Clark Baer, PE; Gus
Kretschmer; Preston Felkel, PE; Aaron Livingston, PE
Support Team: Planners, Utility Coordinators, and document
control specialists
Highlighted Projects Managed:
` Clements F
erry Road
Widening, Phase II
` Henry Br
own Boulevard
Widening, Phase II
` US 176 Widening &
Interchange Improvements
` Daniel Island R
oundabout
` R
oyle Road Signal Plan
` F
arm Hill Circle & Zion Road
(CEI)
` F
oster Creek at Tanner Ford
Boulevard
` I-
26 Widening at Nexion
Parkway (CEI)
` US 52 at US 176 Inter
change
` Fiv
e Dirt-to-Pave Roads
` F
our Major Intersection
Improvements
` Six Major
Capacity Projects
` 59 P
aving Projects
` Local Str
eet Resurfacing
Projects
Daniel Island Roundabout
Henry Brown Road Widening
Due in part to ICE’s oversight during the design phase, the actual
bid for the Project came in at $1.76 Million, substantially under
the pre-bid budget of $2 Million. In addition, ICE’s effective
management during construction led to the Project being
completed ahead of schedule and a savings of $338,234.
Frank Carson, Berkeley County Engineer
25
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
Client: Charleston County , SC
Contract Duration: 2013–Present
Program Value: $847 ,000,000
Completed On-Time/Budget: Ye s
Program Overview: ICE is a trusted partner on Charleston
County’s $847M RoadWise program, providing design, CEI, and
program support services across a variety of capital transportation
projects. From roadway widenings and interchanges to sidewalks
and drainage improvements, ICE’s expertise has contributed to the
successful delivery of critical infrastructure across the County .
Key Services Provided: Engineering; Surveying; Permitting;
Geotechnical; Administrative Services; QA/QC; CEI; Field
Coordination
Key Personnel Involved: Mitchell Metts, PE; Marc Lemin, PE;
Todd Steagall, PE; Aaron Livingston, PE; Preston Felkel, PE; Gus
Kretschmer
Highlighted Projects Awarded:
` Johnny Dodds Boulev
ard Widening (Design-Build)
` US 17 / Main R
oad Interchange & Widening
` P
aving Arman Road & Gifton Avenue
` US 17 at P
arkers Ferry Road Turn Lane
` P
almetto Commerce at Ladson Road Intersection
` East Ashley A
venue at 2nd Street East
` I-
26 at Ashley Phosphate Road
` F
ort Johnson Road Sidewalks, Phases 3 & 4
` Osceola A
venue Drainage Improvements
` Mabeline R
oad Turn Lane Extension
` P
almetto Commerce Parkway , Phase II (Design-Build)
US 17 / Main Road Interchange & Widening
US 17 / Main Road Public Involvement
Johnny Dodds Boulevard Widening
Palmetto Commerce Parkway, Phase II
HALF-CENT SALES TAX PROGRAM
Charleston County
Craig Farm Road
Quality Drive
Craig Farm Road Construction
14+ years
SUPPORTING
LANCASTER COUNTY
26
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC26
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
Highlighted Projects Managed:
` Pr
ograms 1-7 (2015 - 2020):
44 roads paved, totaling 27+
miles
` Pr
ogram 8 (2021 - Present):
CEI and construction oversight
on four roads (2.55 miles)
` Pr
ogram 9 (2024): Currently
underway with the same core
ICE team
Lancaster County
Client: Lancaster County , SC
Contract Duration: Ongoing since 2015
Program Value: $68,092,276
Completed On-Time/Budget: Ye s
Program Overview: ICE has supported Lancaster County
across nine sales tax-funded paving programs, delivering over
30 miles of resurfacing and roadway upgrades on time and
within budget. Acting as a full-service partner, ICE provides
end-to-end management—from pavement design and
drainage evaluations to CEI services and procurement support.
ICE’s continuity across multiple program phases ensures
consistency , cost control, and efficient delivery . The same
experienced team has led Programs 1 through 9, maintaining
strong institutional knowledge and trusted working relationships
with County staff and contractors.
Key Services Provided: Program Coordination and Project
Management; Pavement Design and Cost Estimating; Field
Surveying and Drainage Reviews; Construction Administration
and CEI Services; Consultant Procurement and Bid Support
Personnel Involved: Marc Lemin, PE; Gus Kretschmer
PENNY SALES TAX PROGRAM
Shiloh Unity Road
SURROUNDING AREA
Prior Experience: Jasper County &
Timeframe: January 2021 - Present
Highlighted Projects:
` SCDO
T I-95 (MM 0 – 8) Jasper County: ICE was
selected as the Construction Management and Inspection
provider for SCDOT’s largest bid-build project to date. ICE
will lead the inspection and coordination efforts along this
vital interstate corridor. This project runs directly through
Jasper County and involves ongoing collaboration with
SCDOT, FHWA, and local stakeholders.
ICE has a strong growing presence in Jasper County and has played a key role in several projects in nearby
Beaufort and Colleton counties. We have a proven track record at delivering quality SCDOT-funded and LPA-
compliant projects throughout South Carolina, particularly in rural and coastal communities. Our Team is highly
experienced in navigating utility conflicts, right-of-way challenges, and interagency coordination.
` I- 95 Business Loop Streetscape – Colleton County:
This project consisted of 4.45 miles of improvements
along I-95 Business Loop that included resurfacing the
existing roadway , the addition of raised concrete medians
with underdrain, drainage improvements, and sidewalk
installation. ICE was responsible for providing project/
construction management and CEI services.
` P
athways Project – Beaufort County: ICE is serving
as the prime consultant for the design and delivery of
approximately 16.4 miles of 10’ pathways across Districts
1, 2, 3, 4, 5, and 9. These projects aim to create safer
walking routes to schools and improve connectivity to
residential areas. ICE is leading project management,
surveying, permitting, pathway and drainage design,
utility coordination, and public engagement throughout
the program.
` SCDO
T On-Call CEI – District 6: ICE is providing CEI
services for roadway and bridge projects across the
district, including assignments within Jasper County .
Our Team supports SCDOT through field inspections,
contractor oversight, and quality control to ensure safe,
efficient project delivery .
27
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
28
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC28
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
At ICE, we recognize that a program of this size and
duration demands not only the right team–but also
continuity and a proactive succession strategy . Our
structured approach ensures uninterrupted service to
Jasper County , regardless of staffing transitions over
the life of the program. To lead this effort, ICE has
assembled a strong leadership team: Jeff Buckalew ,
Bryan McIlwee, and Mitchell Metts. Each bring
extensive experience managing complex projects,
and together they offer deep leadership capacity
and continuity . Whether serving as Project Manager
or stepping in to support evolving program needs,
this leadership bench ensures that Jasper County
receives consistent, high-level and long-term stability .
Recognized as the #1 civil design firm in South
Carolina by ENR (2024) and recently ranked
#2 engineering firm for employee satisfaction
by Engineering.com, our commitment to both
project success and team stability sets us apart.
We maintain low staff turnover and strong redundancy
in experience and expertise across key positions.
From day one, each of our key roles will have a
designated deputy or support staff member who
is already embedded in the program, understands
the workflows, and is prepared to step up if needed.
This built-in redundancy ensures that institutional
knowledge, relationships, and momentum are
preserved–no matter what. In addition:
` Our
internal knowledge transfer processes
include shared project management tools,
centralized reporting systems, and team-
wide access to schedules, budgets, and
communications.
` ICE activ
ely invests in developing rising leaders,
ensuring there is a robust talent pipeline in every
discipline–from project management and CEI to
financial and public involvement.
` F
or every key person, ICE leadership identifies at
least one secondary contact to the County , who
can respond quickly and maintain operations
if the primary staff member is temporarily or
permanently unavailable.
Should transitions occur during the program, we
will coordinate closely with the County to ensure
a seamless hand-off, including overlap between
outgoing and incoming staff, updated contact
information, and a clear delineation of duties. Our
goal is simple: to provide stability , consistency ,
and reliability over the full life of Jasper County’s
Transportation Sales Tax Program. We will ensure
there is no hiccup or drop off in the progress of program
due to any change in staff on the ICE team.
More than a slogan–it is a promise. As Program
Manager, ICE will act as an extension of Jasper County
staff, committed to your core goals; economic growth,
safer roads, and lasting infrastructure.
Example: In Berkeley County , ICE managed over
70 transportation projects under the One Cent
Sales Tax Program, including major road widenings,
intersection improvements, and paving initiatives.
This comprehensive management approach led to
enhanced infrastructure and improved quality of life for
residents.
Your Key Project Values,
OUR PRIORITY
Y our Project Team Jeff, Alexis, and Bryan at our Bluffton office
PLANNING
Succession
Client Name Address Client
Representative Telephone Number
Lancaster County , SC
101 N. Main Street, P .O.
Box 1809
Lancaster, SC 29721
Jeff Catoe
Lancaster County Public
Works Director
jcatoe@
lancastercountysc.gov
803-416-9692
Charleston County , SC
4045 Bridge View Drive,
Suite B240
North Charleston, SC
29405
Stephen Thigpen, PE
Charleston County Deputy
Administrator
sthigpen@
charlestoncounty .org
843-202-6146
Berkeley County , SC 1003 Highway 52 Moncks
Corner, SC 29461
Daniel Thrower
Berkeley County Chief
Infrastructure Officer
danny .thrower@
berkeleycountysc.gov
843-719-4131
REFERENCES
Project
29
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
30
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC30
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
31
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
Steven L. Thigpen, P. E.
DCA - Public Servicers
April 18, 2025
Kimberly Burgess, Procurement Officer
..,,, ,._
'm m· �m ...
m m m
CHARLESTON
■ COUNTY ■
SOUTH CAROLINA
Director, Administrative Services Division Jasper County
358 Third Avenue, Suite 304
P.O. Box 1149
Ridgeland, SC 29936
843.202 6146
,tht!,(llcn@cha rlc,roncuu llt)' .c >I")!
Lonnie Hamilton III Public Services Building
4045 Bridge View Drive, Suite B240
orth Charleston, SC 29405
RE: Reference for Infrastructure Consulting & Engineering, LLC for Sales Tax Program
Management Services
Dear Ms. Burgess:
Infrastructure Consulting & Engineering (ICE), formerly known as Coleman-Snow Consultants, has
served Charleston County with professionalism and technical expertise for more than 17 years. ICE
was selected as the Project Manager and Engineer of Record for several major transportation
initiatives funded by the Charleston County Transportation Sales Tax Program, including two large
Design-Build projects: the Johnny Dodds Boulevard Improvements (2008-2013) and Palmetto
Commerce Parkway Phase II (2009-2011). ICE's responsibilities on these projects included contractor
quality control, roadway and drainage design, utility coordination, and surveying.
In 2013, Charleston County selected ICE again to provide comprehensive engineering services for
Sales Tax Program projects. ICE provided surveying, permitting, geotechnical investigations, and
complete engineering and administrative support needed to deliver construction-ready plans.
Projects awarded through this contract include:
• Paving of Arman Road and Gifton A venue
• Turn Lane Improvements at US 17 and Parkers Ferry Road
• Palmetto Commerce at Ladson Road Intersection Improvements
• East Ashley A venue at 2nd Street East
• I-26 at Ashley Phosphate Road
• Fort Johnson Road Sidewalks, Phases 3 & 4
• Osceola A venue Drainage Improvements
• Mabeline Road Turn Lane Extension
Most notably, ICE currently serves as both the lead design firm and the Construction Engineering &
Inspection (CE&I) firm for the $195 million US 17 /Main Road Interchange & Widening project. In
this role, ICE is responsible for:
32
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC32
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
WORKLOAD
33
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
Key Personnel
KEY TEAM MEMBER CURRENT ACTIVE PROJECTS END YEAR % AVAIL.
Jeff Buckalew, PE
Project Manager / Main
Point of Contact
Long Cove Club Paving 2025
75%
Town of Summerville Main Street Resiliency Project 2026
Palmetto Dunes Bridge Rehab 2026
Town of HHI Various On-Call Projects 2026
Mitchell Metts, PE
Principal-in-Charge / QA/QC
Berkeley County Sales Tax Program
SCDOT I-26 Corridor Improvements (MM 172 to 187)
Charleston County Main Road Corridor (Seg. A)
2027
2026
2026
65%
Bryan McIlwee, PE
Assistant Project Manager
Town of Summerville Main Street Resiliency Project 2026
80%
Town of HHI Various On-Call Projects 2026
Town of Bluffton Pedestrian Improvements 2025
Long Cove Club Various Projects 2025
Palmetto Dunes Various Projects 2026
Alexis McIlwee, EIT
Water Resource Engineer
Palmetto Dunes POA Port Tack Drainage Design & Construction 2025
80%
Island Club Entrance Modifications 2025
Town of Summerville Main Street Resiliency Project 2025
I-285 / I-20 Westside Interchange 2026
Barrett Stone
Environmental Manager
SCDOT I-26 Corridor Improvements (MM 172 to 187) 2025
70% SCDOT I-26 / I-95 Interchange Improvements 2026
GDOT SR 316 Bundle 1 2025
Marc Lemin, PE
CEI Oversight – Field
Management
SCPA NBIF Site Development
Beaufort County CEI Projects
2025
2026 80%
Jenny Germuth, PE
Transportation Engineer
Various Berkeley County School District Projects 2026
2026
2028
70% Berkeley County On Call
Dorchester County On Call
Todd Steagall, PE
CEI Program Manager
CCR Phase 1 – QC Inspection & Testing 2025 70%
Gus Kretschmer
Utility Coordination Lead
NCDOT U-3467 Rea Road
NCDOT NC 540 Widening
2025
2026 70%
Randy Carraway, PE
Construction Administration
Engineer
SCDOT – Bridge Package 29 - QC 2025 70%
ICE has been involved in the following litigation in the last five years. These cases will not affect our
performance or ability to serve as Program Manager for Jasper County .
34
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC34
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
HISTORY
Litigation
35
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING
To meet the transportation needs, the County identified priority projects encompassing highways, roads,
bridges, and intersections. These include major capacity expansions such as widening S-442 (Argent
Boulevard) into a 4-or-5-lane arterial to relieve congestion, widening segments of US 278 for regional
traffic, and widening SC 315, US 17 , SC 462 to improve north-south mobility .
Interchange improvements at I-95 (Exits 18 and 22) are planned to enhance connections between the
interstate and local roads – supporting economic development and hurricane evacuation.
Numerous intersection upgrades (e.g., US 17/321 in Hardeeville, US 321/336 in Tillman) will straighten
alignments and improve safety . Even rural infrastructure is prioritized, with projects like Glover Road
improvements (upgrading dirt and paved roads) and Levy Road reconstruction to modern standards.
We understand that roads were prioritized based on objective factors – pavement condition,
safety concerns, traffic volume, congestion levels, and the potential to leverage state/federal
matching funds. This ensures that the program tackles the worst problems first and maximizes outside
funding opportunities. ICE will help advance these priorities, continually evaluating needs and
opportunities to keep the program moving toward completion and aligned with Jasper County’s
goals.
36
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC36
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
The 2024 Transportation Sales Tax Program
Born from these community needs, the Program was approved by voters, signaling a clear mandate for
County action. ICE fully understands the context and significance of this program.
The 1% sales tax will fund a multi-year capital improvement program – unprecedented in Jasper County’s
history –dedicating roughly 80% of revenues to transportation projects and 20% to Greenbelt projects, as
outlined in the referendum ordinance.
For up to 15 years of collections, the program is estimated to generate $470 million for the identified needs.
Jasper County’s leadership wisely structured the program to balance infrastructure upgrades with land
conservation, ensuring sustainable growth and quality of life.
UNDERSTANDING
Program
Jasper County stands at the crossroads of rapid growth and change.
On a weekday morning, traffic on US 278 and other main arteries often back up for miles as commuters,
freight trucks, and tourists all share the road. Longtime rural two-lane roads now serve booming communities,
leading to congestion and safety concerns that have “plagued the county” in recent years.
At the same time, Jasper County’s rivers, wetlands, and green spaces – from Savannah River down to
Broad River – face increasing pressure from development. Residents have voiced a clear desire for better
infrastructure and preservation of natural resources:
Anyone that has driven through Jasper
County from 7 a.m. to 9 a.m. knows that
we need help with our road system.
We want clean drinking water, and
that means protecting land along the
Savannah River.
Top Priorities
ICE’S FIRST STEPS AS PROGRAM MANAGER
1. Integrate with County Staff and Establish Local Public Agency Status
We will embed key ICE personnel alongside Jasper County staff from day one. One of our immediate
actions will be assisting the County in obtaining LPA certification with SCDOT, enabling the County to
let and oversee projects involving federal and state funding. This unlocks autonomy and streamlines
coordination for key corridor projects like US 278.
2. Develop a Clear Program Management Plan (PMP)
We will create a comprehensive PMP that outlines how every part of the program will run–from decision-
making to risk control, budgeting, reporting, and public communication. This document ensured everyone
is working from the same playbook and avoids confusion or delays down the road.
3. Build the Master Program Schedule
A Master Schedule will map out project phasing across the full life of the program. It will track dependencies,
cash flow alignment, design timelines, and construction sequencing–ensuring transparency and
minimizing internal conflicts. This will be updated regularly as projects progress.
4. Identify and Launch “Quick Win” Projects
To build early momentum and public trust, ICE will work with the County to prioritize smaller, high-
visibility projects (e.g., resurfacing or safety improvements) that can be delivered fast. These quick wins
demonstrate progress and encourage continued support from voters and stakeholders.
5. Coordinate Public Involvement and Outreach
Working closely with The Merchant Strategy , our team members will spearhead communications and
engagement with residents, merchants, and stakeholders. Early outreach ensures public concerns and
feedback are heard, incorporated into planning, and help avoid opposition or surprises later.
6. Perform Environmental and Utility Conflict Screenings
Our environmental and utility teams will begin GIS-based screenings across the project list to flag
red flags early (wetlands, historic sites, underground conflicts). Addressing these early avoids costly
redesigns or permit delays later in the program.
7. Review and Refine Project Scopes and Budgets
ICE will evaluate each project’s initial scope, assumptions, and cost estimates to confirm accuracy and
identify areas for refinement or bundling. This step ensures realistic schedules and budgets and forms
the basis for procurement sequencing and bond alignment.
37
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
38
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC38
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Public trust and accountability are central to the
program’s success. The sales tax represents a major
investment by taxpayers, and the public expects visible
improvements and careful fund management. Jasper
County has instituted strong oversight measures,
including a Transportation Sales Tax Advisory
Committee that
will regularly review
project progress and
recommend project
prioritization and
annual independent
spending audits
as required by the
ordinance.
ICE fully supports
these measures. We
will provide clear,
data-driven updates for elected councils and the public
through regular progress reports, website postings,
and annual reports that document accomplishments
in clear, accessible formats. We will track every dollar
and project milestone to ensure full transparency .
Additionally , ICE will help Jasper County leverage
the voter-approved bonding authority — up to $150
million in general obligation bonds — to expedite
priority projects while maintaining fiscal responsibility .
In summary , ICE’s understanding of Jasper County’s
Transportation Sales Tax Program is comprehensive.
Our management
approach will be tailored
to achieve these goals,
with flexibility to adapt
to evolving needs
— whether pursuing
new federal grants or
adjusting for market
conditions. ICE’s
philosophy is rooted
in proactive planning,
stakeholder engagement, and practical solutions.
Jasper County can be confident that our Team
“gets it” and will keep the County’s best interests
at the forefront of every decision. We have the
local knowledge, insight, and forward-looking vision
needed to shepherd this program to success.
AND SUPPORT
Greenbelt Coordination
While the Greenbelt program will be managed by a separate firm, ICE understands that certain elements–
such as the design and construction of civil infrastructure–may intersect with our responsibilities as Program
Manager. These could include building access roads to passive parks, installing docks or trails, or supporting
drainage and site access for preserved lands.
ICE will support the County’s Greenbelt efforts by managing any civil-related scopes that fall within the
Transportation Sales Tax Program, including:
` Coor
dinating with the County and the Greenbelt consultant to scope and schedule civil works
tied to conservation or recreational use
` Ensuring civil impr
ovements comply with permitting, ADA, and environmental standards
` Managing the design and construction of r
oadways, access points, or low-impact amenities
serving broader community and conservation goals
We recognize this program is about more than
adding lanes or preserving land—it’s about
delivering improvements that enhance daily life,
build public trust, spur economic opportunity,
and preserve the Lowcountry character of
Jasper County.
39
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
MANAGEMENT
Project
As Program Manager, ICE will establish a strong project management framework from day one. Our
first task will be to integrate with Jasper County’s Team and act as an extension of County staff. We
will have our Project Manager and key staff work hand-in-hand with County staff and officials. We will
first assist the County in obtaining Local Public Agency (LPA) certification with SCDOT
. This is a
crucial step to enable Jasper County to self-manage projects that involve state and federal funding.
ICE has several former SCDOT management on staff and is well-versed in SCDOT’s LPA requirements.
Our Team includes professionals who have developed and implemented LPA procedures. We will
guide the County through the application, training, and compliance process so that the County gains
the authority to let and oversee projects on state highways using local funds.
Achieving LPA status early will save time and money later by streamlining coordination with SCDOT
on projects like the US 278 corridor and I-95 interchanges.
Next, ICE will prepare a detailed and comprehensive Program Management Plan (PMP) that
will serve as the playbook for the entire sales tax program. This document will outline governance,
communication protocols, public information, reporting and, risk management strategies, quality
control measures, and every aspect of program execution. For example, the PMP will establish
protocols for a clear hierarchy of decision-making (so minor design adjustments do not require full
Council approval, for instance) and will define how changes in project scope or schedule are evaluated
and approved.
Cost estimates will be reviewed, vetted, and updated annually , as this is key to keeping pace with
market trends and avoiding budgets being busted seemingly without reason. It will also include a
public involvement plan (developed in concert with the County PIO and stakeholders) to ensure
citizens stay informed about progress, public meetings, and road work schedules.
Program Management Foundation
40
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC40
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Schedule and phasing management is a critical
element ICE brings to Program and Project
Management. We will develop and maintain a Master
Program Schedule that sequences all projects over
the 15-year period, considering logical priorities,
dependencies, and funding flows. Our scheduling
experts will use software tools, such as Microsoft
Project, to integrate individual critical path method
project schedules into a program-wide Gantt chart
that clearly shows and tracks critical tasks and
deadlines as well as design and construction timelines
for each road project and the timeline for Greenbelt
acquisitions and improvements. This schedule will
be a living document, updated continuously and
reviewed in bi-weekly coordination meetings.
Early in the program, ICE will help Jasper County
prioritize “quick win” projects – those that can be
initiated and completed in the first few years (such as
intersection improvements or urgent safety fixes) – to
show immediate results to the public. Concurrently ,
we will launch the design of larger projects (such as
the Argent Blvd widening and other major widening
projects) so that those can enter construction by 3-5
years with the aid of bond financing, as needed.
We will recommend staggering projects to avoid
overloading local traffic detours or the construction
labor market at any one time. Our approach to
phasing will ensure that each year of the program
yields tangible improvements, while maintaining
manageable workloads.
Master Scheduling and Quick Wins
ICE’s Project Managers will convene weekly update meetings with design consultants and contractors once
projects are active and monthly status meetings with County leadership and the Advisory Committee to review
high-level progress or at frequencies as directed by the County . A cornerstone of our project management
approach is risk management.
ICE will lead a cost-risk analysis workshop for each major project at the conceptual stage. In these
workshops, we will bring together subject-matter experts (design engineers, environmental scientists, utility
coordinators, etc.) to brainstorm potential risks – e.g., unforeseen wetlands increasing permitting time on a
road widening, or utility relocations adding costs and delays – and assign likelihood and cost impacts to each.
This process, which ICE has successfully used on large highway projects, results in a “risk-adjusted” cost
and schedule that can help condition expectations and avoid unpleasant surprises.
By quantifying risks early
, w
e can develop contingencies and mitigation plans (such as scheduling certain
activities in dry season to minimize environmental delay or bundling utility relocations into the construction
contract to maintain control). This proactive approach sets ICE apart – rather than reacting to problems,
we anticipate and neutralize them to keep the program on track.
Risk Management and Early Mitigation
US 278 Corridor – Phase 1
41
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Stakeholder Coordination
ICE's project management team will emphasize
proactive stakeholder coordination and
communication through the program.
We recognize that successful delivery involves
many parties including:
` County Departments
` SCDO
T
` Municipalities (Har
deeville & Ridgeland)
` Utility Companies
` Pr
operty Owners
` R
egulatory Agencies
` The Gener
al Public
To maintain alignment across all groups, out
Project Management Team will establish
dedicated coordination channels tailored to
each stakeholder's needs.
SCDOT Coordination:
We will hold quarterly meetings with SCDOT to
review the status of projects on state route. These meetings will ensure that project plans meet SCDOT
standards and that required approvals are secured on schedule–preventing administrative delays and
streamline delivery .
Municipal Coordination (Hardeeville and Ridgeland):
We will meet regularly with the City of Hardeeville to coordinate on projects within or near city
limits—such as the US 17/321 intersection upgrades and Argent Boulevard improvements.
These discussions will incorporate local input on design elements and ensure
traffic management plans minimize impacts on daily life and commerce.
Similarly , ICE will coordinate closely with Ridgeland leadership on projects that affect their jurisdiction to
ensure local needs and concerns are addressed early in the design and construction process.
Emergency Responders and School District Coordination:
ICE will assist County staff in maintaining direct contact with emergency
responders and school officials during project planning and construction phasing.
We will work to ensure that emergency routes are preserved, detours are clearly communicated, and
school bus operations remain safe and efficient throughout construction activities.
Berkeley County Sales Tax
Ribbon Cutting Ceremony
42
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC42
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
ICE’s public involvement efforts will be led by TMS, a trusted communications partner on our Team. Their
work will ensure that Jasper County citizens remain informed, engaged, and supportive throughout the life of
the Transportation Sales Tax Program.
Public Outreach and Communication
Public Meetings
and Community
Engagement
TMS will organize public information meetings at key project milestones, such
as during concept planning phases and prior to the start of major construction
activities. These sessions will provide opportunities for residents to offer
feedback, ask questions, and stay involved throughout program delivery .
Program Website
and Public Portal
We will develop and manage a dedicated Program Website and Public Portal
to serve as the central information hub for all project activities. This will feature:
` Pr oject Updates and Announcements
` Inter
active Maps
` Construction Timelines
` Financial Summaries
` Public Comment and F
eedback Tools
Social Media and
Targeted Outreach
To complement the website, TMS will implement regular social media
updates and targeted outreach materials designed to keep a broad audience
informed. These communications will help tell the story of the program clearly
and compellingly , reinforcing transparency and building public trust over the
course of the multi-year effort.
ICE's Integration
Role
ICE's program management team will fully integrate public outreach activities
into the broader management strategy , ensuring that transparency , open
communication, and accountability are maintained throughout every phase of
the Transportation Sales Tax Program.
43
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
FINANCIAL MANAGEMENT
Program and
Big-Picture Financial and Schedule
Oversight
Managing a $470 million program requires meticulous
financial and schedule oversight, along with a big-picture
perspective on how all the moving parts fit together.
ICE’s approach will ensure that every dollar of the
Transportation Sales Tax is maximized and accounted
f o r.
We will handle the program’s finances with the same care
as we would our own—exercising fiscal discipline,
transparency , and strategic planning to deliver projects
on time and within budget.
Budget Setup and Financial
Reporting
We will work with the County Finance Department to set
up budget accounts for each project and for overall
program administration. As invoices come in – from design
consultants, contractors, land purchases, etc. – they will
be logged against the respective project budgets in real-
time. Our financial analysts will generate monthly financial
reports that summarizing:
` Expenditur
es to date
` P
ercent of budget used
` R
emaining funds per projects
These reports will be tailored for different audiences:
` Detailed versions
for County Finance staff
` High-level summaries f
or the Advisory Committee
and the public, ensuring financial transparency at
every level
Setup and Forecasting
Real-Time Tracking
Cost Controls
Audits and Reporting
Create project-specific budget accounts,
forecast revenue, and align funds with
project phasing.
Log invoices against live budgets and
generate monthly reports showing
expenditures, % used, and remaining
balance.
Establish cost targets, manage
consultant pricing, and bundle projects
strategically to maintain efficiency and
value.
Support annual audits and prepare
public-facing financial summaries with
clear charts and plain-language insights.
44
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC44
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Sales T ax Revenue
Management and Cash Flow
Planning
ICE is very familiar with the revenue mechanics
of local option sales taxes. Jasper County’s tax
will have a defined lifespan of no more than 15
years and will collect up to $470 million (or cease
when that amount is reached). We will work with
the County to develop conservative revenue
projections each year, likely in consultation with
the State Department of Revenue data. Knowing
the expected cash flow , we will help plan how to
phase projects accordingly .
Strong cost management is essential throughout
design and construction. Some years will see
spikes in construction spending, whereas sales
tax revenues accrue steadily . ICE will develop and
periodically update cost-loaded schedules for
each project to determine anticipated cash needs.
ICE will use this as the basis to assist the County in
determining when it may be appropriate to bond up
to the approved $150 million to save on escalating
construction costs. For example, we anticipate the
County being able to pay-as-you-go during the
first two years of the program.
Getting design contracts in place and the design
phase underway and finalized will be a relatively
minor funding need when compared to the
construction phase, which is the most expensive
and last phase of the project delivery . We will
develop a 15-year cash flow model that plots
out sources and uses of funds, ensuring that the
program never faces a funding shortfall.
Cost Control Strategies
Cost control is another essential aspect of our
financial management. ICE will enforce strong
cost management practices from design through
construction.
In design, we will set cost targets for each project
(based on the referendum estimates and our
refined cost-risk analyses) and challenge design
consultants to stay within those targets. We will
review design decisions for cost efficiency –
for instance, evaluating whether a 5-lane section
can transition to 4 lanes sooner to save costs
without impacting traffic or using retaining walls
strategically to reduce right-of-way acquisition.
During construction procurement, ICE will assist
the County in packaging projects in a way
that achieves economics of scale and attracts
competitive bids (perhaps bundling smaller
projects together or separating specialty work into
different contracts to get the best pricing). We will
provide independent engineer’s estimates for
each construction project being bid and may need
to negotiate to keep contractor prices reasonable.
Rigorous Change Order
Management
Every change will be evaluated for necessity , and
we will seek cost recovery or value engineering
options to offset any added costs. By having a
full program view , we can sometimes offset cost
increases on one project with savings on another. For
example, if Project A comes in under budget, we can
reallocate those funds to Project B if needed, with
County approval. We will recommend developing
and maintaining a program contingency fund,
if feasible (essentially a reserve from within the
$470M) to handle unforeseen costs, and we will
only dip into it with proper justification and after
exhausting other avenues.
"More Value per Penny: Through
aggressive pursuit of grants and smart
project phasing, ICE will stretch Jasper
County's Penny Sales Tax further –
delivering more improvements without
more cost"
45
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Grant and Additional Funding
Support
A distinguishing feature of ICE’s approach is our
commitment and strategy to identify additional
funding sources to stretch leverage and maximize
the County’s sales tax dollars.
The referendum’s success positions Jasper
County as an excellent candidate for matching
grants – many state and federal grants look for local
commitment, which the sales tax demonstrates.
ICE will actively seek grants (like USDOT’s
RAISE or INFRA grants, South Carolina State
Infrastructure Bank opportunities, or FEMA
resilience grants for road improvements in
flood-prone areas). We will work with the County
to prepare compelling grant applications. We will
use our knowledge of the projects to emphasize
regional significance (for US 278, for example) or
safety benefits (for rural road improvements).
If successful, these grants could fund portions
of projects, freeing up local funds to cover more
scope or additional projects. ICE is very familiar
with federal requirements and will guide the County
accordingly , should a federal grant be obtained.
Financial Compliance and
Reporting
Identifying other funding sources will extend the
program’s impact far beyond what the sales tax
alone could achieve. On the administrative side,
ICE will ensure strict compliance with financial
regulations and reporting requirements unique to
other funding sources. We will assist the County
during the annual independent audits by keeping
immaculate records and documentation for every
transaction.
Our Team will assist the County by providing any
needed project documentation so that auditors
(and the public) can easily verify that funds were
spent in accordance with the referendum’s intent.
We will also help draft the annual report to the
County Council and the public, which the Advisory
Committee can present, documenting progress
and expenditures in an accessible format. ICE’s
experience preparing similar reports for other county
programs means we know how to communicate
the program’s financial health clearly , using charts,
tables, and plain language summaries.
Summary
ICE's Program and Financial Management
approach is characterized by comprehensive
oversight, strategic financial planning, and
unwavering public transparency . Jasper County’s
citizens will be able to see that their money is
managed by professionals who care about value
and accountability . Success for us means delivering
all promised projects within the $470 million—or
even doing more—by smart management and
leveraging funds. ICE’s track record of effective
program controls and financial stewardship will be
a tremendous asset to Jasper County .
Mitchell Metts, Principal-in-Charge
46
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC46
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Project Scoping Reports That Define Scope, Needs, and
Expectations
For each transportation project in the program, ICE will develop a detailed Project Scoping Report (or
Project Planning Report). This report will be a foundational document that compiles all key information and
decisions about the project at the concept stage.
Per the RFQ expectations, our Conceptual Design Team will include in these reports:
` Dr
aft Purpose and Need Statement
(identifying why the project is needed, e.g.
relieve congestion on SC 170, or improve safety
at a skewed intersection);
` A detailed
Project Description
;
` Pr
oposed Design Criteria (design speed,
typical section width, design standards);
` A sk
etch-level Conceptual Design layout
(plan view of road improvements, preliminary
alignment or widening footprint and typical
sections);
` The Pr
oject Extents (location, area, and
length);
` An Envir
onmental Constraints overview
(identifying wetlands, historic properties,
endangered species habitats or other concerns
in the area);
` An initial determination of the
required
NEPA level (e.g. Categorical Exclusion vs.
Environmental Assessment) and any likely
environmental permits needed
;
` A Utility Coor
dination overview (noting which
utilities are present and potential conflicts);
` P
otential Easement and Right of Way needs,
based on concept plans;
` A
preliminary Cost Estimate (itemized to
the extent possible, including contingencies
informed by the risk analysis);
` A
projected critical-path Schedule for design
and construction
The r
eport will serve as a one-stop reference for County officials, the Advisory Committee, and other
stakeholders. ICE will seek County approval before development, incorporate review comments, and finalize
the report for public release.
AND CONCEPTUAL DESIGN
Project Planning, Scoping,
Laying the Groundwork with Purpose and Clarity
For successful design and construction, good planning is essential. ICE’s approach to Project Planning,
Scoping, and Conceptual Design will set each project up for success by clearly identifying objectives and
ensuring that we utilize the first principles of thinking:
“Begin with the end in mind.”
In this early phase, our Team will work closely with Jasper County , SCDOT, municipalities and other
stakeholders to define each project’s objectives, explore alternatives, and resolve the final scope, budget,
and schedule – all while considering environmental and community factors from the outset.
47
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Holistic, Multidisciplinary Scoping
What sets ICE apart in this stage is our experienced and holistic approach to project scoping.
This will be key to avoiding confusion and misunderstandings, and enable us to set and meet, or
exceed expectations. We do not just consider the engineering – we also consider community input,
environmental stewardship and realistic permitting timeframes, right-of-way impacts and
acquisitions, and constructability from the beginning.
Our Team will organize field visits and charrettes for each major project, bringing together engineers,
environmental scientists, and utility experts to walk the project area (physically or via maps and
Streetview) and identify issues early. For example, on the SC 46/170/315 intersection project, our
scoping Team will coordinate with both SCDOT and local engineers and planners because this project
could significantly alter traffic patterns at a key junction between Jasper and Beaufort counties.
We will evaluate different conceptual layouts with County staff (perhaps a roundabout vs. a
signalized realignment) and weigh them against the project goals of capacity and safety . For widening
projects like US 17 or SC 315, early decisions like which side of the existing roadway to widen on (or
whether to add lanes symmetrically) will impact how many parcels might be affected by proposed
right-of-way .
ICE will generate and compare alternatives at the conceptual stage, often presenting options with
pros/cons and cost differences and recommendations to aid decision-making. This way , County
leaders and the Advisory Committee can be involved to make informed decisions on the preferred
concept that balance cost, impact, and benefit.
Early Public Engagement for Local Support
Another critical aspect at this stage is public involvement, which will be led by our communications
partner, The Merchant Strategy . While full public meetings may occur later during design, our Team
believes in early and meaningful engagement—especially for projects that have a direct impact on
communities, such as the reconstruction of Levy Road through residential areas.
ICE and The Merchant Strategy will take the lead in engaging residents, local leaders, and property
owners early in the scoping phase through meetings, small workshops, or neighborhood listening
sessions, and can develop website information and surveys or questionnaires to poll the affected
community and quantify the inputs received so that the County leaders understand the public’s
desires. These interactions are vital for capturing community priorities and building support—whether
it is concerns about speeding, access, or preserving neighborhood character—which can then be
reflected in the conceptual design.
48
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC48
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
The Outcome: Clarity, Speed, and Confidence
At the conclusion of the planning and conceptual phase, Jasper County will have a clear roadmap for
each project: a defined scope, a baseline schedule, and budget, and documented considerations
of environment and utilities. This creates a solid foundation on which designs can proceed at speed. By
investing time and expertise in thorough project scoping, ICE will help avoid indecision and scope creep
and minimize surprises later.
Our approach in this phase is essentially about de-risking the projects early in the program—clearing
the path forward so that design engineers, contractors, and everyone involved know exactly what the goal
is and what should be expected.
Environmental Planning
Integration to Minimize Delays
ICE’s approach also emphasizes environmental
planning integration. Our environmental Team will
perform desktop environmental screenings during
scoping. Using GIS data, we will map wetlands,
floodplains, endangered species ranges, cultural
resources, etc., relative to each project.
If a planned road widening on US 17 looks like it could
encroach on a marsh, we will note the permitting
requirements and consider design options (like
bridging or shifting alignment) to minimize impacts.
By identifying environmental red flags early , we can
often streamline the NEPA process later.
In one case, an ICE environmental planner discovered
a historical site near a planned bridge project during
the planning phase – we adjusted the alignment by
a few yards and avoided what would have been a
lengthy Section 106 historic review .
For Jasper County’s projects, we will similarly strive
to avoid or minimize impacts at the conceptual
stage, saving time in permitting. The planning reports
will clearly list anticipated permits (e.g., a Nationwide
Permit from the Army Corps for a particular culvert
extension), so the County is aware of the likely
environmental steps for each project upfront
.
Data-Driven Conceptual
Design
Innovative conceptual design is another
strength ICE brings. We employ advanced
tools like traffic simulation software (Synchro/
SimTraffic, VISSIM) during planning to test
and present to decision makers how different
design concepts will perform.
For example, for the US 278 corridor
widening, we can simulate future traffic with
and without certain improvements (such
as added turn lanes at key intersections or
innovative intersection designs) to ensure
the concept we pursue will truly alleviate
congestion and meet project objectives.
We also consider constructability and
maintenance of traffic in our concepts – how
to build the project without creating additional
traffic burdens for those who have to use the
road. It might influence whether we build new
lanes to one side first or expand symmetrically .
Our construction experts weigh in early so
that our conceptual designs are realistic and
buildable.
49
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
The Challenge of Utility Relocation
Relocating utilities is often one of the most challenging and poorly planned aspects of transportation
projects – if not managed well, it can lead to delays, cost overruns, and unhappy stakeholders.
ICE’s approach to Utility Coordination is proactive, systematic, and founded on strong relationships with
utility companies. Our goal is to “clear the path” for each project, like the Pittsburgh Steelers’ Mike Webster
opening a hole in the defensive line for Franco Harris to run through, by resolving utility conflicts early and
efficiently so that utilities do not become the Achilles’ heel of Jasper County’s Road improvements.
Program-Wide Utility Communication
Our Utility Coordination Team will begin by notifying all utility owners in Jasper County (and the surrounding
region, since some infrastructure like telecom or gas lines might traverse the area) about the passage of the
sales tax program and the upcoming projects
. Early communication sets a collabor
ative tone.
We will provide them with maps and descriptions of the project corridors and request information on their
existing facilities in those areas. ICE has a database of utility contacts (and we will augment it with local
knowledge from County staff who know which companies operate where).
The utility owners will be invited to a Utility Coordination Kickoff Meeting where we introduce the program
(projects and schedules), establish points of contact and lines of communication, and emphasize that we
want to work together to minimize impacts – this meeting helps get buy-in and puts faces to names, fostering
partnership rather than adversarial interactions.
Project-Level Coordination Framework
For each individual project, ICE will follow a structured utility coordination process (aligned with SCDOT’s
Utility Accommodation policies and any local protocols). Key steps include:
Subsurface Utility Engineering (SUE)
We will arrange for SUE services (using a qualified subconsultant if needed) to accurately locate underground
utilities in the project areas
.
Quality Level B (designating) and Quality Level A (test holes) data will be
obtained for critical conflict points.
This precise information allows us to plot utilities on the design plans and identify conflicts with proposed
construction (for example, a water line that runs exactly where a new storm drain is planned). By investing
in SUE, we avoid nasty surprises during construction like uncharted lines.
COORDINATION
Utility
50
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC50
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Utility Conflict Analysis
Once we have the existing utility maps and the
project’s conceptual (and later detailed) designs,
ICE will perform a conflict analysis.
We will mark which utilities are in conflict and which
might remain in place. For those not impacted, we
will obtain letters of “No Conflict” from the owners
to document that they have reviewed the plans and
foresee no issues
.
For utilities that are impacted, we
categorize the conflicts by severity and type.
Relocation Strategy
Development
ICE acts as the facilitator between the project design
team and the utility owners
. W
e will sit down with
each utility company (power, water/sewer, telecom,
gas, etc.) to discuss the conflicts and brainstorm
solutions.
Sometimes, a road design can be tweaked slightly to
avoid a utility (for instance, shortening or shifting a
culvert to avoid moving a water main). We will pursue
those design accommodations where feasible as a
first option. Where relocations are unavoidable, we
work with the utility to decide new alignments for
their lines and coordinate that with the road design.
ICE will prepare utility relocation drawings or
markups of the road plans showing where utilities
could move to, ensuring they do not clash with other
proposed relocations
. W
e also coordinate between
utilities – for example, if the power company needs
to move poles and the telecom has lines on those
poles, we facilitate a combined approach so they
relocate in concert or perhaps move underground
together, etc.
Our utility coordinators will hold regular utility
coordination meetings (likely monthly during design
phases) to keep all parties informed and working in
the same direction.
Determining Prior Rights and
Cost Responsibility
A critical aspect is determining who pays for each
relocation. ICE will thoroughly research prior rights
– whether the utility has an easement or was there
by permit – to establish if the County (project) is
responsible for relocation costs or if the utility must
cover it
.
This can be complex, but our Team’s experience
with utility agreements and a long history of SCDOT
projects will ensure Jasper County does not overpay
for relocations. For utilities without prior rights (i.e. in
public right-of-way by permit), we will obtain no-cost
agreements where the utility owner agrees to move
at their own expense
. If a utility does hav
e prior rights
(e.g., an easement that predates the road project),
then the project may need to fund the relocation – in
those cases, we will negotiate utility agreements that
clearly outline the scope and cost, and we will seek
ways to minimize that cost (perhaps by including the
relocation in the road contractor’s work for efficiency ,
or standardizing materials).
We will explore in-contract utility relocation for cases
where it makes sense – meaning the road contractor
would perform the relocation as part of the highway
contract
. This can sometimes be f
aster and cheaper,
especially for smaller utilities, and we will coordinate
such arrangements with the utility owners as needed.
Relocation Schedule and
Execution
Once plans are settled, we will push for utilities to
relocate ahead of or during construction in a timely
manner. ICE will create a Utility Relocation Schedule
that is coordinated with the project construction
schedule
. W
e will monitor progress closely .
Our Team will serve as on-site liaisons during
relocation work, resolving any field issues (for
instance, if a buried cable is found slightly off
its assumed location, we work out a quick field
adjustment with the designer and utility crew). By
keeping a close eye, we ensure relocations happen
as planned.
51
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Documentation and Close-out
ICE will maintain detailed logs of all utility coordination communications, approvals, and
agreements.
Before a project goes to construction, we will have a Utility Clearance Letter on file indicating
all utilities are addressed (either relocated or protected in place) so that the contractor knows
they have a clear site, except for any coordinated work.
What Sets ICE's Utility Coordination Apart
` P ersistent, Proactive Communication
We engage utility providers early—and follow up often—to keep project needs at the top
of their priority list.
` Str
ong Industry Relationships
Our team has long-standing connections with South Carolina utility companies and
understands their processes, preferences, and constraints.
` Utility-Specific Scheduling Insight
W
e plan around utility needs—like telecom providers preferring a single relocation phase
with ample notice—so nothing falls through the cracks.
` T
ech-Enabled Coordination
We use shared GIS maps, live utility databases, and collaboration platforms to
streamline communication and track relocation updates in real time.
52
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC52
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
From Plans to Pavement: Delivering with Confidence and
Control
When it comes to turning plans on paper into pavement on the ground, ICE’s Construction
Administration approach ensures that construction is executed safely , efficiently , and to the highest
quality standards. We see Construction Administration as the phase where all the careful planning
and design pays off – and we are there every step of the way to protect the County’s interests and
deliver a successful project. Jasper County’s sales tax program will involve many construction
contracts over the years, from small intersection upgrades to multi-mile widenings, and even possibly
amenities for Greenbelt projects. ICE’s seasoned CEI Team will oversee these with a consistent,
rigorous methodology .
Pre-Construction Services
Our involvement in construction starts even before a contractor breaks ground. ICE will assist
Jasper County with bid package preparation and procurement for each project. We will ensure
the construction documents (plans, specifications, contract provisions) are clear, biddable, and
reflective of the County’s requirements. In particular, we will incorporate any necessary local
provisions such as traffic management constraints (e.g., no lane closures during peak hours on US
278) and DBE participation goals. We will support the County’s procurement process by conducting
pre-bid meetings, answering contractor questions (issuing addenda as needed), and evaluating bids
for completeness and responsiveness. Once a contractor is selected, ICE can facilitate the pre-
construction conference to align expectations between the contractor, County , and any third parties
(utilities, etc.).
Construction Inspection and Oversight
ICE will provide on-site CEI services for the program’s projects, acting as the County’s eyes and ears
on the job site. Our certified inspectors and resident engineers have extensive experience on SCDOT
and local projects, which means they are intimately familiar with roadway construction methods,
SCDOT standard specs, and quality requirements. The RFQ allows the Program Manager to perform
CEI, and ICE has a full CEI division ready to deploy . For each active construction contract, we will
assign a Resident Project Representative (RPR) – a highly qualified engineer or inspector who will
be on site daily to inspect the work, coordinate with the contractor, and ensure compliance with
plans and specs. Supporting the RPR will be a team of inspectors (scaled to the project’s needs – a
big widening might have multiple inspectors for structures, earthwork, paving, etc., whereas a small
sidewalk project might need one part-time inspector). All our inspectors hold necessary certifications
(ACI concrete, NICET, asphalt roadway technician, erosion control, etc.) to test materials and verify
workmanship meets or exceeds standards.
ADMINISTRATION
Construction
Quality Assurance
ICE will implement a Quality Management Plan for construction. This includes detailed daily inspection
reports (documenting weather, work performed, manpower, equipment, materials, tests, etc.), material
sampling and testing protocols (ensuring, for instance, that asphalt delivered meets mix design and density
requirements), and prompt issue tracking. If any deficiencies are observed – say concrete that does not
meet strength or a curb that is not to line/grade – our Team will flag it and ensure the contractor corrects it,
either by repair or replacement, at no cost to the County . Our philosophy is “build it right the first time,” and
we work closely with contractors to achieve that. However, if issues arise, we are resolute in enforcing the
contract.
Contract Administration and Compliance
ICE’s construction managers will handle the myriad of administrative tasks that come with construction.
We will review the contractor’s baseline schedule and monitor schedule updates, verifying that sufficient
progress is being made. If a contractor falls behind, ICE will proactively engage them with recovery plan
discussions to mitigate delays. We will process submittals and shop drawings – reviewing contractor
submissions (or forwarding to the design engineer when technical) in a timely manner so as not to hold up
work. Our Team will also evaluate change order requests – only those merited by unforeseen conditions
or minor owner-directed changes will be recommended, and we will negotiate fair pricing using our cost
estimate skills and by analyzing contractor provided breakdowns.
An important part of contract administration is pay application review . ICE will thoroughly check the
contractor’s monthly pay requests against field progress. We will verify that claimed quantities of work
were indeed installed and meet specifications before recommending payment. This protects the County
from overpayment and ensures the pay reflects true progress (which ties into our budget tracking for the
program).
Safety and Environmental Oversight
Safety oversight is another duty – we will monitor that the contractor is following OSHA regulations and
project-specific safety plans. For example, on a roadway project, we will continuously check that proper
traffic control (signs, cones, flaggers, if needed) is in place to protect both workers and the traveling public.
If we see any unsafe conditions, our inspectors are empowered to immediately require corrections or pause
work if necessary . Safety is non-negotiable in our approach.
Environmental compliance during construction will also be watched. Jasper County’s beautiful environment
must be protected even as we build roads. ICE inspectors will ensure that erosion and sediment control
measures (silt fence, construction entrances, etc.) are properly installed and maintained, and that there
are no violations of environmental permits (like improper wetlands disturbance or turbidity in streams). We
document these inspections and any corrections, keeping the project in good standing with regulators.
53
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
54 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC54 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Traffic and Stakeholder
Coordination
Traffic and stakeholder coordination during
construction is something ICE will actively manage.
Construction can be disruptive – lane closures,
detours, noise – and we will minimize those impacts
through careful coordination. Our Construction
Team will send out weekly look-ahead schedules to
stakeholders (schools, emergency services, public
via website) to inform them of any significant traffic
impacts coming. We will coordinate with SCDOT
District traffic engineers for any required lane closure
approvals on state routes. If work is occurring in a
neighborhood (like Levy Road reconstruction), we
might go door-to-door beforehand with flyer’s, so
residents know what to expect and whom to call.
The program web site will be frequently updated for
project construction information. Because we were
involved from the start, our Team will be familiar
faces, maintaining trust built during the earlier
phases.
Final Close-Out and
Continuous Improvement
Closing projects out properly is the last step of our
construction administration. ICE will ensure punch
list items are addressed thoroughly , and we will
not recommend final acceptance until everything
is completed to standards. We will gather all as-
built drawings (surveys and redlines from the
contractor) and deliver organized project files to
the County for maintenance records. We will also
verify all warranties and guarantees are in place
for materials or equipment. A successful close-out
also includes reflecting on lessons learned – ICE
does post-project reviews to capture any insights
that can be applied to future projects in the program
(continuous improvement).
Why ICE's Construction Approach Works
What sets ICE apart in Construction Administration is our depth of experience and commitment to timely , on-
budget delivery without sacrificing quality . We have managed construction on interstate interchanges with
multi-year schedules and on small sidewalk jobs – in all cases, we treat the project as if we are the owner. Our
construction managers are adept at problem-solving on the fly . For instance, if unexpected poor soil is found
(something that can happen in the Lowcountry), we quickly convene with geotechnical engineers and propose
solutions (undercut and backfill, soil stabilization, etc.) to keep the job moving – all while negotiating costs so
the County is not blindsided.
Finally , we recognize that Jasper County’s program will run for many years, and construction technology and
methods evolve. ICE stays at the forefront of industry practices – whether it is new materials, accelerated
bridge construction techniques, or improved project management software. We will continuously improve our
construction administration approach by adopting proven innovations that can save time or money for the
County .
In summary , ICE’s Construction Administration approach is to ensure that plans translate to successful
projects on the ground. Through diligent oversight, effective communication, and a solutions-driven mindset,
we will deliver each project to Jasper County’s expectations. When a project is finished – say a widened Argent
Boulevard is opened to traffic, or a new park is opened along the Savannah River – we want the County and its
citizens to celebrate not just the end result, but also to be proud of staff, to look back and say , “That project went
very smoothly .” Our approach will make that outcome the rule, not the exception.
55
Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC
Section D | SCOPE OF WORK APPROACH
Conclusion: A Trusted Partner for a Transformative
Program
Jasper County’s Transportation Sales Tax Program is ambitious and transformative.
It requires a Program Manager with vision, experience, and dedication equal to the
task. ICE’s proposed approach – rooted in best practices and customized for Jasper
County – will ensure the program’s success from planning through construction. We
will manage the big picture without losing sight of the details, always guided by the
principle that this program is for the people of Jasper County . Our narrative-driven and
collaborative style of management will keep everyone – officials, stakeholders, and
citizens – on the same page and informed of the progress and value being delivered.
By choosing ICE, Jasper County gains a partner who has the technical knowledge,
the local and regional experience, and the passion to deliver. We will turn the list of
projects and initiatives approved by the voters into a legacy of safer roads, stronger
communities, and protected landscapes. ICE is ready to begin immediately , and we
are committed to seeing the program through to its successful completion. Together,
let’s build the future of Jasper County – one road, one bridge, one green space at a
time – and do it with excellence and integrity .
Task Description DELIVERABLE September Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2
ICE FEE
1 Task 1 - Program Management Services
1.a. Assist the County in obtaining Local Public Agency (LPA) status with South Carolina
Department of Transportation (SCDOT) and compliance with LPA. 1/31/2026
1.b.
Coordinate, manage, and review Project plans, technical reports, specifications, and
estimates prepared by project design consultants providing professional services to the
County, for consistency with contract budgets, schedules, scope of work, design criteria, and
applicable standards. This shall include civil site improvements associated with the Greenbelt
Initiatives.
As-Needed
1.c. Update Project cost estimates (25) annually 12/31/2025
1.d.
Prepare independent cost estimates for Project professional services and assist the County
with scope, schedule, and fee negotiations with Project design consultants, also to include
the civil site improvements associated with the Greenbelt Initiatives.
12/31/2025
1.e.
Review Project design consultant invoices for accuracy, compliance with contract terms, and
progress of the work. This shall include civil site improvements associated with the
Greenbelt Initiatives.
Monthly
1.f. Conduct meetings, monitor design progress, and keep the County informed of each Project’s
status. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed
1.g.
Coordinate with municipalities, environmental agencies, and other project stakeholders as
applicable to secure necessary approvals and permits prior to the construction letting. This
shall include civil site improvements associated with the Greenbelt Initiatives.
As-Needed
1.h.
Ensure that all necessary permits and environmental approvals are obtained prior to letting a
Project for construction. This shall include civil site improvements associated with the
Greenbelt Initiatives.
As-Needed
1.i.
Ensure that all rights and easements necessary for the project are acquired prior to the
construction letting. This shall include civil site improvements associated with the Greenbelt
Initiatives.
As-Needed
1.j.
Ensure that all utility coordination activities necessary to facilitate project construction have
been performed prior to the construction letting. This shall include civil site improvements
associated with the Greenbelt Initiatives.
As-Needed
1.k.
Perform technical, constructability, and maintainability reviews, including life cycle costs,
accessibility, equipment clearances, etc. prior to the construction letting. This shall include
civil site improvements associated with the Greenbelt Initiatives.
As-Needed
1.l.
Responsible for overseeing the preparation of construction bid documents by the project
design consultants, including the review of plans, specifications, estimates of quantities, bid
schedules invitations to bid or request for proposals that shall comply with the County
procurement code. This shall include civil site improvements associated with the Greenbelt
Initiatives.
As-Needed
1.m.
Conduct pre-bid meetings, review bids, and advise the County through selection and contract
award process. This shall include civil site improvements associated with the Greenbelt
Initiatives.
As-Needed
1.n.
Coordinate and/or conduct value engineering studies and recommendations as may be
requested to reduce construction costs. This shall include civil site improvements associated
with the Greenbelt Initiatives.
As-Needed
1.o. Review and maintain project related correspondence and files. This shall include civil site
improvements associated with the Greenbelt Initiatives. As-Needed
1.p.
Perform public outreach activities including public meeting facilitation, mailer and handout
design, coordinate response to public comments and meetings, or as required. This shall
include civil site improvements associated with the Greenbelt Initiatives.
As-Needed
2 Task 2 – Program and Financial Management
2.a. Provide a written monthly Program Status Report for County staff and Council, due by
12:01p.m. local time on the 15th of each month.
15th of each
month
2.b. Attend all meetings associated with the program as directed by the County. As-Needed
2.c.
Prepare a Program Management Plan that will serve as the playbook for the entire sales tax
program. This document will outline governance, communication protocols, public
information and reporting strategies, risk management strategies, quality control measures,
and every aspect of program execution.
12/31/2025
2.d.
Prepare a Master Program Schedule that sequences all projects over the 15-year period,
using logical priorities, dependencies, and funding flows. The master schedule shall integrate
individual critical path method project schedules into a program-wide Gantt chart that clearly
shows and tracks critical tasks and deadlines a for the design, right of way acquisition,
permitting, and construction for all projects within the program and the timeline for
Greenbelt acquisitions/improvements. This will be updated quarterly and as projects
progress.
3/31/2025
2.e.
Develop and maintain a Program Financial Plan to forecast Program revenues, project
expenditures, and cash balances. The financial plan shall be in accordance with the CIP and
the Consultant will participate in the County’s annual CIP planning process. Revenue and
cash reports will be County derived and maintained.
12/31/2025
2.f.
Provide quarterly financial reports to include revenues, encumbrances, and expenditures,
due 30 days after the end of the quarter, using data provided by the County Finance
Department.
30 days past
Quarter
2.g.
Develop and implement a Public Involvement Plan which shall include a Program website,
strategic use of social media, holding public meetings as requested to provide accurate, up to
date project information to the citizens of Jasper County. This shall include civil site
improvements associated with the Greenbelt Initiatives.
12/31/2025
2.h.
Develop and manage a dedicated Program Website, hosted and maintained by the
Consultant with a link to/from the County’s web site, to display program information, project
updates, interactive maps, timelines, and financial summaries, FAQ as well as an option for
citizens to ask question or provide input.
12/31/2025
2.i. Develop and implement a project Data Management System that provides readily accessible,
complete, and well-organized files for each project. 12/31/2025
2.j. Provide the County with recommendations for the timing and amount of bond issuances,
based upon the Program Financial Plan. 3/31/2026
2.k. Review and recommend methods to maximize efficiency and achieve economies of scale in
the procurement of projects. Annually
2.l.
Develop consistent Design Criteria, standards, and specifications for use on projects
developed by the Program where needed due to no available or applicable SCDOT design
criteria or SCDOT standard specifications.
12/31/2025
2.m. Investigate and recommend available Grant Opportunities on behalf of the County. Ongoing/Annual
2.n. Assist with document production related to Freedom of Information Act (FOIA) requests and
other requests for information as applicable. As-Needed
2.o.
Assist with the development of encroachment permits, intergovernmental agreements (IGA),
memorandums of understanding (MOU), memorandums of agreement (MOA) and financial
participation agreement (FPA) to facilitate coordination with the SCDOT, South Carolina State
Infrastructure Bank (SCSIB) and other applicable parties as needed.
As-Needed
2.p. Determine a method to evaluate project risk and cost, conduct risk analysis as needed, and
make recommendations based on analysis. (Risk Analysis per SOQ) 12/31/2025
2.q. Conduct bid analysis/evaluation of bids or prepare cost estimates for comparison when
appropriate. Provide engineers probable opinion of cost when requested. As-Needed
3 Project Planning, Scoping, and Conceptual Design
Establish the scope of improvements, cost estimates, and baseline cost-loaded schedules for
each project including the following subtasks. This would include civil site improvements
associated with the Greenbelt Initiatives.
1/31/2026
A. Development of Conceptual Project Design
Perform feasibility and initial constructability review of a conceptual design and scope of each
project. Provide baseline costs and schedule, to include design, right-of-way, construction,
utility coordination, utility relocation, and permitting.
The conceptual designs shall be developed in accordance with the South Carolina
Department of Transportation (SCDOT) Highway Design Manual and the American
Association of State Highway and Transportation Officials (AASHTO) “A Policy on Geometric
Design of Highways and Streets”.
Conceptual designs shall be developed on aerial photography and available GIS. Design
features to be illustrated shall include the proposed roadway typical sections, roadway
alignments, lane configurations, auxiliary intersection turn lanes, and bicycle & pedestrian
facilities. The conceptual designs shall be presented on color roll-plots for coordination with
project stakeholders and on 11” x 17” size sheets for incorporation into a project planning
report.
PROJECT SPECIFIC SCHEDULE
5-YEAR SCHEDULE - JASPER COUNTY SALES TAX PROGRAM MANAGEMENT
*This schedule is for the Planning Phase, based on a Notice To Proceed of September 1
EXHIBIT C
July 2025
PLANNING PHASE
2025 2026 2027 2028 2029 2030
Work to minimize impacts to private property, buildings, cultural features (churches,
cemeteries, parks, etc.), major utilities, and natural resources in the development of the
project conceptual designs. COUNTY GIS property lines shall be referenced into the
conceptual design to estimate right of way impacts for each project. Impacts on buildings and
cultural features shall be estimated from aerial photography and a project field review.
Perform an environmental screening to determine the presence of likely hazardous material
sites, threatened and endangered species, historical/cultural resources, floodplains, and
jurisdictional wetlands within the project area. The presence of these environmental
constraints will be determined through a windshield survey and database searches.
Identify the expected permits and NEPA compliant environmental document (Categorical
Exclusion, Environmental Assessment, or Environmental Impact Statement) required for each
project based on conceptual design and environmental screening.
B. Baseline Cost Estimates and Schedules
Prepare a cost estimate for each project based on the conceptual project design. Project cost
estimates shall represent the total cost of project development and include the following
typical project costs:
1/31/2026
o Engineering services (planning and design),
o Right of way acquisition (land and services),
o Wetland mitigation,
o Utility relocation (utilities with prior rights),
o Construction,
o Construction engineering & inspection.
Appropriate factors shall be applied in coordination with the COUNTY to provide for
contingency within each project budget to address unforeseen conditions.
Baseline schedules to be developed for each project shall include the project phases of
planning and design, right of way acquisition, environmental permitting, utility coordination,
construction procurement, and construction. Cost estimates associated with each of these
project phases shall be used to create a cost loaded schedule for purposes of program
financial planning.
1/31/2026
Evaluate projects through a cost-risk analysis to identify risks to the project scope or
schedule which may significantly impact project cost. A cost-risk workshop will be conducted
for each project to engage subject matter experts in a review of the projects to identify
potential risks based on their experience with transportation project development in the
area. The project cost estimate will be refined to account for the magnitude and likelihood of
each identified risk.
3/31/2026
C. Environmental Overview
Prepare a Project Planning Report for each project to present the conceptual design,
environmental overview, utility overview, cost estimate, and schedule. The reports shall
contain the following information:
3/31/2026
o Draft Purpose and Need Statement,
o Project Description,
o Design Criteria,
o Conceptual Design,
o Project Location and Length,
o Environmental Constraints
o Identify the Required NEPA Environmental Document,
o Identify the Required Environmental Permits,
o Utility Information
o Cost Estimate
o Schedule
These reports will be submitted to the County and SCDOT (if applicable) for review and
comment. All comments will be addressed as applicable in a comment response matrix and
revised final reports will be provided to the County.
4/31/2026
D. Plan Review
For projects on SCDOT roadways or within SCDOT ROW, the consultant shall conduct a
cursory review prior to submittal to SCDOT. The review will ensure that plans satisfy SCDOT
requirements and foreseeable errors are addressed. Detailed review of design and/or
calculations will not be required.
As-Needed
For projects in the County or municipal system, the consultant will act as the County
reviewer and will review for design, calculation, adherence to appropriate standards and
specifications, and constructability.
As-Needed
If plans require submittal to County planning or other departments for review, then the
Consultant will facilitate and communicate as needed As-Needed
4 Task 4 – Utility Coordination Services
4.a.
Prepare a Utility Coordination Plan for the Program, to guide the procedures for an ongoing
process from conception to construction, to include Proactive Conflict Identification,
Collaboration & Communication, Data-Driven Decisions, Risk Assessments and Mitigation
Strategies, & Contingency Planning and Budgeting, Regular Joint Meetings, and Legal Rights
and Contractual Agreements.
12/31/2026
4.b. Notify all known utility owners in the area of the projects and identify those utilities with
existing and proposed facilities in the project areas. 12/31/2025
4.c. Facilitate and act as intermediary between project design team and utility representatives.
4.d. Hold regular joint utility meetings with utilizes once initial projects begin design phase. Ongoing
4.e. Arrange for Project Design teams to employ Subsurface Utility Engineering (SUE) to establish
utility locations and identify conflicts . As-Needed
4.f. Obtain letters of “no-conflict” for those utilities which are not impacted. As-Needed
4.g. Coordinate with utility owner(s) and designer(s) to develop relocation plans for those
conflicts which cannot be eliminated. As-Needed
4.h. Review all utility owners’ relocation plans to ensure that relocations proposed by one owner
do not conflict with another’s relocation. As-Needed
4.i. Establish prior rights of occupancy. As-Needed
4.j. Obtain no-cost letters from those utility owners without prior rights or develop utility
agreements with those owners who can document their prior rights. As-Needed
4.h. Evaluate the feasibility of in-contract utility relocation and develop necessary agreements in
coordination with the utility owner. As-Needed
4.i. Develop Contractual Provisions and Incentives: As-Needed
4.j. Clear Utility Relocation Clauses: Incorporate explicit clauses in construction contracts that
clearly define responsibilities for utility coordination, relocation, and unexpected discoveries. As-Needed
4.k. In utility agreements consider incentives for early relocation and penalties for unreasonable
delays. As-Needed
4.l. Monitor the progress of utility relocation and incorporate utility relocation schedules into the
overall project schedule and master program schedule. As-Needed
4.m. This shall include Utility Coordination Services for civil site improvements associated with the
Greenbelt Initiatives. As-Needed
5 Task 5 - Right of way Acquisition Services
5.a. Prepare a Right of Way Acquisition Plan for the Program 12/31/2025
5.b.
Provide R-O-W services to coordinate, plan, direct, and control R-O-W activities necessary to
legally acquire and record R-O-W needed for construction, ensuring that all R-O-W acquired
complies with all other applicable laws, ordinances, regulations, policies, etc.
As-Needed
5.c. Forecast and estimate R-O-W acquisition schedules and R-O-W cash flow expenditures and
timelines for acquisition. 3/31/2026
The following services will be performed on an as-needed basis for the individual projects,
5.d. Perform title search and provide title opinions for parcels requiring acquisition. As-Needed
5.e. Provide appraisal cost estimates for acquisitions, by a South Carolina licensed appraiser. As-Needed
5.f. Procure or perform appraisals and review the appraisals provided by others. As-Needed
5.g. Negotiate acquisitions, providing a translator when necessary. As-Needed
6 Task 6 – Program Construction Administration
6.a. Constructability reviews of plans and specifications prepared for projects prior to
construction letting.
6.b. Attend pre-construction conferences, routine construction coordination meetings, etc.
6.c. Reviewing and maintaining records of plans, specifications, shop drawings, revisions,
correspondence, warranties, etc.
6.d. Monitor each construction project and prepare monthly status reports.
6.e. Evaluating and recommending actions related to progress payments, change requests,
claims, disputes,
6.f. Performing project close-out activities.
6.g.
Fostering and maintaining a positive public image related to construction operations by
proper interaction with the public and media, maintenance of traffic, attention to safety,
permit compliance
6.h. This shall include Construction Administration for civil site improvements associated with the
Greenbelt Initiatives.
EXHIBIT D
FEE PROPOSAL - TRANSPORTATION SALES TAX PROGRAM MANAGEMENT
July 2025
Task Task / Deliverable Descrip�on Fee
1 PROJECT MANAGEMENT SERVICES – Hourly Allowance, Includes
Project Task Orders
$3,000,000.00
Project specific Task Orders shall be issued and assigned under this as they are
activated, each with a refined scope, schedule and fee – Assume 12 projects started in
first 5 years
2 PROGRAM AND FINANCIAL MANAGEMENT – Hourly Allowance $950,000.00
3 PROJECT PLANNING, SCOPING, AND CONCEPTUAL DESIGN –
Hourly Allowance, Includes Project Task Orders
$2,000,000.00
Project specific Task Orders shall be issued and assigned under this as they are
activated, each with a refined scope, schedule and fee – Assume 12 projects started
in first 5 years
4 UTILITY COORDINATION SERVICES – Hourly Allowance $600,000.00
5 CONSTRUCTION ADMINISTRATION – Hourly Allowance (NOT CEI) $700,000.00
6 RIGHT OF WAY ACQUISITION SERVICES – Hourly Allowance $700,000.00
INDIVIDUAL EARLY DELIVERABLES – TOTAL (Each at LUMP SUM) $250,000.00
Individual Deliverables – Each at Lump Sum LS
2.c. Program Management Plan $36,000
2.d. Master Program Schedule $25,000
2.e. Program Financial Plan $32,000
2.g. Public Involvement Plan $22,000
2.h. Program Web Site Development and Startup $20,000
2.i. Data Management Plan / System $32,000
2.l. Design Criteria and Standards $15,000
2.q. Risk Analysis Method $24,000
4.a. U�lity Coordina�on Plan $20,000
6.a. R/W Acquisi�on Plan $24,000
GREENBELT WORK, UNKNOWNS and ADD’L SRVCS $700,000.00
DIRECT REIMBURSABLES $85,000.00
FIRST 5 YEARS – ESTIMATED N.T.E. TOTAL FEE = $8,985,000.00
Billing & Invoicing
• Work shall be invoiced Monthly based on actual hours (�me & materials) capped by NTEs.
• The atached Hourly Rate sheet (Exhibit E) includes the personnel direct labor rate with a 3.0
mul�plier to produce the contract billing rates.
• Unit Lump Sum rates for the individual early deliverables shall be billed at % complete.
• Allowable Reimbursables shall include mileage at the IRS standard business mileage rate, federal
per diem for travel greater than 4 hours, reproduc�on, mailing or delivery services, public
mee�ng and field work incidentals, and shall be billed at cost.
• Sub-consultant fees will not be marked up , but �me spent managing sub-consultant contracts
shall be billed accordingly.
EXHIBIT E
ICE HOURLY RATES
JASPER COUNTY TRANSPORTATION SALES TAX PROGRAM MANAGEMENT
Annual escalation of hourly rates shall be allowed per contract in accordance with the Consumer Price Indexing
Name Job Title Jasper County Project Role
July 2025
Direct
Labor Rate
Contract Hourly
Billing Rate
ICE: 3.0 X
Direct Labor
Mitchell Metts VP of Special Projects Sr. Engineer $100.96 $303
Leland Colvin Vice President - Special Projects SCDOT Liaison $112.98 $339
Les Blankenship Vice President/Chief Administrative Officer Legal Review $100.96 $303
Jeff Buckalew Program Manager Project Manager $79.33 $238
Bryan McIlwee Project Manager Deputy Project Manager $75.48 $226
Alexis McIlwee Water Resources Designer Designer $45.67 $137
Josh Apsitis Assistant Project Manager Engineer $61.44 $184
Barrett Stone Vice President & Environmental Services Manager Sr. Biologist / Environmental Dept Head $88.94 $267
Cody Conner Senior Environmental Specialist Biologist / Environmental $46.96 $141
Daniel Koon Jr. Environmental Specialist Biologist / Environmental $26.49 $79
Gus Kretschmer Utility Coordinator Uitlity Manager $80.22 $241
Matthew Cox Utility Coordinator Utility Coordinator $67.50 $203
Jenny Germuth Sr. Transportation Engineer Sr. Designer $72.12 $216
Andy Gillis VP of Special Projects Sr. Engineer $85.58 $257
Aaron Livingston Project Manager Project Manager / Sr. Engineer $96.15 $288
Clarke Hinson Manager of Roadway Group (Charleston) Project Manager / Sr. Engineer $79.33 $238
Alex Nettles Roadway Engineer Sr. Designer $68.80 $206
Preston Felkel SC Structures Manager Project Manager / Sr. Engineer $96.15 $288
Ray Spence Structural Engineer Project Manager / Sr. Engineer $90.48 $271
Clark Baer Structural Engineer Engineer $61.15 $183
Jay Thompson VP - Pavement Consultancy Services Project Manager / Sr. Engineer $98.56 $296
Shilpa Girish Pavement Designer Designer $39.23 $118
Stuart Timmons SC Upstate Design Manager/Hydro Manager Project Manager / Sr. Engineer $86.54 $260
Jordan Bianchi Hydro Designer Designer $51.49 $154
Renee Mulholland Environmental Planner Biologist / Environmental $65.22 $196
Henry Phillips Sr. NEPA Planner Biologist / Environmental $65.87 $198
Trinaty Geraurd Assistant Project Manager - Special Projects Designer $39.42 $118
Marc LeMin VP - CM CE&I Services (SC Lowcountry) CEI Manager / Sr. Engineer $96.15 $288
Randy Carraway Project Manager Construction Manager / Sr. Engineer $98.56 $296
Todd Steagall Construction Project Manager Construction Manager / Sr. Engineer $100.48 $301
Eric Dillon Project Engineer Sr. Traffic Engineer $82.88 $249
Craig Nelson Traffic Engineer Traffic Engineer $58.17 $175
Lisa Schwartz Document Control Manager/Program Coordinator Adminstrative / Data Management $42.39 $127
The Merchant Group Public Information Sub-Consultant
Sharon Merchant, Principle QA / QC $200
Cheryl Scott Public Involvement Officer Project Lead $150
Colleen Hackett Public Involvement Specialist Project Asssistant $125
RND Consultants Right of Way Acquisition Sub-Consultant
Janice Bergeron Principle QA/QC $341
Nathan Midkiff Project Manager Right of Way Agent Lead $205
Renee Bergeron Project Engineer Right-of-Way Agent $115
Tracy DeFreitas Administrator Right-of-Way Assistant $125
July, 2025
ICE HOURLY RATES - JASPER COUNTY TRANSPORTATION SALES TAX PROGRAM MANAGEMENT
181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com
An Equal Opportunity Employer
Jim Iwanicki, P.E.
Engineering Services Director
Jasper County, SC
623 Live Oak Road
P.O. Box 1244
Ridgeland, SC 29936
Date: August 5, 2025
Subject:
Fee Justification for Program Management Services – Jasper County Transportation Sales Tax
Program
Overview of Program Scope and Fee Context
The approved $376 million Transportation Sales Tax Program will fund approximately 16 major
transportation infrastructure projects over the next 10 to 15 years, involving significant planning,
design coordination, permitting, right -of-way acquisition, public engagement, utility
coordination, construction, and inspection responsibilities. ICE will serve as the County’s trusted
advisor and implementation partner to ensure these projects are delivered on time, within
budget, and in compliance with federal, state, and local standards.
The proposed $8.95 million not -to-exceed fee reflects a fair and appropriate investment in
professional program management services and equates to approximately 2.4 % of the total
program value, a percentage well within industry norms for similar sales tax programs in other
counties across South Carolina and the Southeast.
Breakdown of Key Services Included
ICE’s scope of services includes the following core components over the first five years:
Program Management and Administration
• Program startup, scheduling, staffing, budgeting, and reporting
• Develop Program plans and guidance documents
• Ongoing coordination with County staff, elected officials, and the Advisory Committee
• Monthly progress reports and annual program performance assessments
Public Engagement and Communication
• Development and maintenance of a program website and project map
• Creation of public outreach materials and social media content
• Coordination of public meetings, stakeholder engagement, and Council presentations
Financial Oversight and Funding Strategy
• Development and maintenance of the program cash flow model
• Budget tracking, invoice reviews, and financial reporting
181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com
An Equal Opportunity Employer
• Assistance with matching funds, grants, and leveraging opportunities
Project Planning and Design Oversight
• Development of scopes, schedules, and cost estimates for individual projects
• Procure services of design firms
• Coordination with design consultants and technical review of submittals
• Conceptual design and engineering feasibility assessments where required
Fee Structure and Staffing
Below is the estimated "Not to Exceed" (NTE) fee for Infrastructure Consulting and Engineering
(ICE) to provide program management services for Jasper County's 15 -year, $376M
transportation sales tax program (2025–2030). The $8.95 million estimate is based on estimated
hours for key personnel, including a dedicated Program Manager (PM) at a rate of $260/hour and
support staff such as Project Engineers, Public Engagement Specialists, Construction
Coordinators, and Administrative Support, all billed at competitive industry-standard rates.
ICE has structured the team to provide maximum value and flexibility to the County while
maintaining a lean and responsive staff footprint.
Fee Estimate Summary (Years 2025–2030)
Task Description Estimated Hours Estimated Fee
Task 1 Project Management 14,900 $3,000,000
Task 2 Program & Financial Management 4,715 $950,000
Task 3 Planning, Scoping & Concept Design 9,900 $2,000,000
Task 4 Utility Coordination 2,860 $600,000
Task 5 Construction Administration 3,036 $700,000
Task 6 ROW Acquisition Services 2000 + unit costs $700,000
Subtotal = $7,950,000
Early Deliverables = $250,000
Greenbelt Initiatives (Unknowns) = $700,000
Reimbursable Expenses = $85,000
TOTAL ESTIMATED N.T.E. FEE (Years 1-5) = $8,985,000
Breakdown by Task
Task 1: Project Management Services
• Scope: Design firm procurement, IGA/LPA coordination, design oversight, cost estimating,
bid management, public outreach.
• Effort: High ongoing effort
• Fee: $3,000,000
181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com
An Equal Opportunity Employer
Task 2: Program & Financial Management
• Scope: Program plans, master schedule, financial forecasting, public involvement,
FOIA/grants.
• Effort: Intensive in Year 1 (setup), then 120 hrs/month.
• Fee: $950,000
Task 3: Project Planning & Conceptual Design
• Scope: Feasibility, environmental screening, cost -risk analysis, planning reports for 6
priority projects and 5 intersection projects.
• Effort: 800 hrs/project (top 6 priority projects and 5 intersection projects by 2030).
• Fee: $2,000,000
Task 4: Utility Coordination
• Scope: Utility conflict resolution, SUE coordination, relocation agreements.
• Effort: Varies by project. 40 hrs/project/month during design/ROW phases.
• Fee: $600,000
Task 5: Construction Administration
• Scope: Constructability reviews, attend construction meetings, document control,
monthly status reports
• Effort: Varies by project
• Fee: $700,000
Task 6: ROW Acquisition Services
• Scope: Title searches, appraisals ($1,500/parcel), negotiations ($200/hr), relocation
support.
• Effort: 60 hrs/project + unit costs. Assumes 200 parcels acquired in 5 years.
• Fee: $700,000
Total 5-Year NTE Fee: $8,985,000
Annual Average: $1.79M/year
Percent of Total Program: 2.4%
The estimate assumes:
• Full program ramp-up in Year 1 and continued active delivery in Years 2–5
• Strategic use of ICE personnel to reduce reliance on higher-cost specialty consultants
• Efficient use of time and budget through proactive management and prioritization
Other Key Assumptions:
• Program Duration: 15 years total, but fees estimated for first 5 years (2025 –2030) as
requested, and assuming 12 project are activated in first 5 years.
• Project Phasing: 16 projects staggered over 15 years. Years 1–5 focus on planning, design,
ROW, and early construction for 6 priority projects and 5 intersection projects.
181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com
An Equal Opportunity Employer
• 2025 Hourly Rates: (direct labor X 3.0, blended for unit rate and escalated at 2.5%
annually)
• ROW Costs: Based on industry standards for South Carolina (appraisals, title searches,
negotiations). Non-hourly unit costs included.
• Greenbelt involvement, scope volatility and unforeseen complexities (e.g., environmental
delays, ROW disputes) is an unknown.
• Task Weighting: Higher effort in early years for program setup, planning, and ROW.
Comparison to Other Counties
Fee comparisons from other South Carolina counties with similar sales tax programs support the
reasonableness of this proposed fee:
• Charleston County (2022): $2.1 billion program, 1.1% PM fee over first phase
• York County (2017): $277 million program, 1.5% PM fee
• Berkeley County (2019): $587 million program, ~1.3% for program and construction
oversight combined
At 2.4% of Jasper County’s $376 million program, ICE’s proposed fee is below the industry
average of 3-6% for full program management and consistent with regional norms and reflects
the relative scale, geographic complexity, and required support functions for a successful
program.
Conclusion
The proposed fee is a reasonable, necessary, and competitive cost to ensure professional delivery
of one of Jasper County’s most significant public infrastructure investments. ICE is committed to
full transparency, continuous accountability, and delivering high-value services that maximize
every dollar of the sales tax funding entrusted to this program.
We look forward to serving as your long -term partner and delivering these important projects
for the citizens of Jasper County.
Respectfully submitted,
Jeffrey S. Buckalew, PE
Program Manager
Infrastructure Consulting & Engineering