RecordWell Data

08.22.2025 E packet

Jasper County · Jasper County · meeting of Aug 22, 2025 · Agenda packets

Open the original document More from Jasper County

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

AGENDA 08.22.2025 PAGE 1 A TRANSPORTATION SALES TAX ADVISORY COMMITTEE MEETING WILL BE CONDUCTED AT THE CITY OF HARDEEVILLE IN COUNCIL CHAMBERS. Watch Live via YouTube at: http://www.youtube.com/@jcmedia6537 I nstructions may also be found at the Jasper County website www.jaspercountysc.gov FOR MORE INFORMATION, PLEASE CALL (843) 717-3696 AGENDA 08.22.2025 PAGE 2 1 0:00AM JASPER COUNTY 2024 Transportation Sales Tax Advisory Committee Meeting City of Hardeeville – Council Chambers 205 Main Street Hardeeville, SC 29927 Friday, August 22, 2025 AGENDA • C all to Order • Chairman John Kemp – Welcome and Comments • James Iwanicki – Program Manager Update • Discussion of Collections and Financing • General Discussion • Set Date and Time for Next Meeting • Adjourn In accordance with South Carolina Code of Laws, 1976, Section 30-4-80(d), as amended, notification of the meeting was posted on the County Council Building at a publicly accessible place and on the county website at least 24 hours prior to the meeting. A copy of the agenda was given to the local news media and posted at the meeting location twenty-four hours prior to the meeting. Special Accommodations Available Upon Request to Individuals with Disabilities, please contact the Jasper County ADA & Civil Rights Coordinator, Tisha Williams by telephone at (843) 717-3690 or via email at jcadministrator@jaspercountysc.gov no later than 48 hours prior to the scheduled meeting. Page 1 of 2 August 18, 2025 MEMO: TO: Andrew Fulghum, County Administrator 1% Sales Tax Advisory Committee FROM: Jim Iwanicki RE: Jasper County Update 1% Sales Tax Update (Roadway) August 18, 2025, Update: Jasper County advertised a Request for Qualifications (RFQ) on March 17, 2025, with a due date of March 17, 2025, for a Program Manager for the Transportation Sales Tax Program . Four RFQs were received. The R FQs were scored by a committee consisting of The City of Hardeeville, The Town of Ridgeland, The Jasper County School System, and Kim Burgess, Jasper County’s Director of Administrative Services. Jim Iwanicki recused himself from the scoring because of his working relationships with some of the proposers. The team recommended Infrastructure Consulting & Engineering, LLC ( Consultant) as the most qualified proposer. This information was shared with the Transportation Sales Tax Advisory Committee, and they supported the selection of the Consultant as the most qualified proposer. Kim Burgess, David Tedder and Jim Iwanicki met with the Consultant and negotiated the attached contract. The c ontract reflects the items of work described in the RFQ and additional items identified and agreed upon by both parties that should be included to provide the required Program Management. The Consultant’s compensation will be on an hourly fee basis, and a lump sum for the early - known deliverables, as described in Exhibits D and E of the Contract. The hourly rate schedule and fee proposal has a not -to-exceed limit of e ight million nine hundred e ighty-five thousand dollars ($8,985,000.00). Individual Task Orders may be executed as part of this contract for specified projects and tasks, in which the Consultant shall be compensated in accordance with mutually agreed upon Task Orders for which the specific scope, schedule and fee for each job order will be individually negotiated. The f ee represents about 2.4% of the $376 million program during the first 5 years. The total not to exceed fee for the first five years if pro- rated to remain constant over 15 years would be 7.1% of the Transporta tion Program. As laid out in the RFQ the first few years will require more administrative effort to get the program activated and it Jasper County Engineering Services P.O. BOX 1244 ▪ Ridgeland, South Carolina 29936 Phone (843) 726-7740 ▪ FAX (843) 726-7743 James M Iwanicki, P.E. Director of Engineering Services JIwanicki@jaspercountysc.gov JMI Page 2 of 2 is expected that the fees for the years beyond year 5 will be a lessor percentage of the program thus bringing the overall program management fee closer to 6% over the 15 years . As a comparison, similar scoped program management fees in other counties were Richland County 6.5%, Horry County 5.5%, and York County 5.0%. Recommendation: Staff recommends that the Transportation Sales Tax Advisory Committee support and recommend the following to County Council: Approve the contract with Infrastructure Consulting & Engineering, LLC for the Program Management of the Transportation Sales Tax Program for a not -to-exceed limit of e ight million n ine hundred e ighty-five thousand dollars ($8,985,000.00). Individual Task Orders may also be executed as part of this contract for specified projects and tasks, in which the Consultant shall be compensated in accordance with mutually agreed upon Task Orders for which the specific scope, schedule and fee for each job order will be individually negotiated. Attachments: Contract Contract Exhibits* Consultants Letter Dated August 5, 2025, to Jim Iwanicki *Notes: Exhibit B-1 Original RFQ Exhibit B-2 Consultants Proposal 1 of 9 AGREEMENT FOR PROFESSIONAL SERVICES BETWEEN Jasper County, South Carolina AND Infrastructure Consulting & Engineering, LLC THIS CONTRACT IS SUBJECT TO ARBITRATION PURSUANT TO S.C. CODE ANN. §15-48-10 This AGREEMENT is made and entered into this _____ day of _____________, 2025, by Infrastructure Consulting & Engineering, LLC located at 110 Midlands Court, West Columbia, SC 29169, (CONSULTANT), and Jasper County located at 358 Third Avenue, Ridgeland, SC 29936, (COUNTY). WHEREAS, CONSULTANT represents that the work to be performed is within its particular area of expertise, is qualified to perform such services , and shall be fully responsible for means and methods used in performing its work (WORK). COUNTY relies upon such representations. NOW THEREFORE , for good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereto agree as follows: ARTICLE I - GENERAL PROVISIONS 1.1. Scope. CONSULTANT will provide WORK as described in Exhibit A, “Scope of Services,” (SCOPE) to be negotiated and mutually agreed upon by both parties and made a part of this AGREEMENT. WORK described under the SCOPE shall be completed by CONSULTANT as directed by COUNTY. 1.2. Independent Contractor. Nothing in this AGREEMENT creates a relationship between COUNTY or its affiliates and CONSULTANT, except that of an independent contractor. 1.3. Ownership of Documents. 1.3.1. CONSULTANT agrees that all reports, drawings, studies, specifications, estimates, maps, computations, test results, and other data (DOCUMENTS) prepared by or for CONSULTANT under this AGREEMENT are “work for hire” and shall be delivered to, become, and remain the property of COUNTY upon completion of, and payment for, the WORK. 1.3.2. COUNTY agrees that CONSULTANT shall have the right to retain one or more copies of DOCUMENTS. COUNTY shall have the right to use DOCUMENTS without restriction , limitation, or additional compensation to CONSULTANT. 1.3.3. CONSULTANT shall not incur any liability for use or re -use of its DOCUMENTS on an extension of this project or on another project where such use or re -use is without CONSULTANT’S written consent. 1.4. Electronic Data. 1.4.1. The parties recognize that drawings, specifications, three-dimensional modeling (such as CAD drawings, MS Office files, and Building Information Models), and other DOCUMENTS may be transmitted among COUNTY, CONSULTANT, and others by electronic media as an alternative to paper hard copies (collectively “Electronic Data”). 2 of 9 1.4.2. The transmitting party specifically disclaims all warranties, expressed or implied, including, but not limited to, implied warranties of merchantability and fitness for a particular purpose. However, transmission of Electronic Data shall not invalidate or negate any duties pursuant to the applicable standard of care with respect to the creation of Electronic Data unless such data is materially changed or altered after it is transmitted, and the transmitting party did not participate in such change or alteration. 1.4.3. CONSULTANT acknowledges that differences may exist between Electronic Data and hard-copy DOCUMENTS. In the event of a conflict between hard-copy DOCUMENTS and Electronic Data, signed or sealed hard-copy DOCUMENTS shall govern. 1.4.4. CONSULTANT agrees to indemnify and hold COUNTY harmless for all claims arising from the use of Electronic Data by CONSULTANT or any third party authorized by CONSULTANT. 1.5. CONSULTANT shall comply with the terms contained in Exhibit F: Mandatory Federal Provisions if the project involves Federal funds. ARTICLE II - COUNTY 2.1. COUNTY shall designate a person to act with authority on COUNTY's behalf and respond in a timely manner to submissions by CONSULTANT. 2.2. COUNTY shall furnish information or services required by this AGREEMENT with reasonable promptness. COUNTY shall also furnish any other information or services under the COUNTY’s control and relevant to the CONSULTANT ’s performance of the WORK with reasonable promptness after receiving a written request for such information or services. ARTICLE III - CONSULTANT 3.1. CONSULTANT shall be responsible for the professional quality, technical accuracy, timely completion, and the coordination of all designs, drawings, specifications, reports, and other services furnished by CONSULTANT under this AGREEMENT. 3.2. Taxes/Fees. CONSULTANT shall pay all taxes imposed by any federal, state, or local taxing authority on: (a) all fees, costs and other compensation paid by COUNTY to CONSULTANT pursuant to this AGREEMENT; and (b) all payroll and compensation sums paid by CONSULTANT to CONSULTANT’s employees and (c) all other taxes, fees, and charges levied against CONSULTANT on account of this AGREEMENT. 3.3. Qualification of CONSULTANT’s Personnel. Persons assigned by CONSULTANT to the WORK shall be duly qualified, experienced, and have a thorough knowledge of federal, state, and local regulations and policies regarding their respective disciplines. CONSULTANT shall not replace any member of CONSULTANT’s team designated in the SCOPE that remains in CONSULTANT’s employ without the approval of COUNTY, which approval by COUNTY shall not be unreasonably withheld. CONSULTANT shall notify COUNTY immediately in writing if a member of CONSULTANT’s team designated in the SCOPE leaves CONSULTANT’s employ. The CONSULTANT shall replace any member of CONSULTANT’s team designated in the SCOPE to which COUNTY reasonably objects. 3 of 9 3.4. CONSULTANT represents that (a) WORK will be performed in a manner consistent with the care and skill ordinarily exercised by other professionals practicing in the same locality and providing similar services on projects of similar size, complexity and conditions; and (b) in conformance with the SCOPE and all work orders. 3.5. Time for Performance. 3.5.1. Time limits stated in the SCOPE and Exhibit C, “Program Schedule”, are of the essence to the AGREEMENT. 3.5.2. CONSULTANT shall provide a status report to COUNTY on a regular basis or with each invoice submittal detailing the progress of the WORK , including whether ( a) the WORK is proceeding according to the time limits stated in the SCOPE; and (b) items exist which require resolution so as not to jeopardize CONSULTANT’s ability to meet SCOPE time limits. 3.5.3. CONSULTANT will provide deliverables continuously and diligently, providing sufficient personnel, material, and equipment to meet project schedules and milestones, including the use of overtime if appropriate . CONSULTANT shall be responsible for all damages incurred by COUNTY due to delays caused by CONSULTANT. 3.6. Audit:/Access to Records. 3.6.1. CONSULTANT shall maintain books, records, logs, and other documents pertinent to the WORK in accordance with generally accepted accounting principles and industry practices. COUNTY, other applicable agencies, or any of their duly appointed representatives shall have access to any of this information for the purposes of examination, audit, excerpts, and transcriptions. 3.6.2. Records described above shall be maintained and made available during the performance under this AGREEMENT and for a period of three years after COUNTY makes final payment with all other pending matters closed. 3.7. Indemnification. 3.7.1. CONSULTANT shall indemnify and hold harmless COUNTY, their officers and employees, from liability of any nature or kind, including costs and expenses (including but not limited to reasonable attorney’s fees), for liability for damages resulting, in whole or in part, from negligent acts, errors, omissions, or misconduct of CONSULTANT or any person or organization for whom CONSULTANT may be responsible including, but not limited to, CONSULTANT ’s subcontractors. 3.7.2. Approval by COUNTY or other agencies of drawings, designs, specifications, reports, and incidental engineering work or materials furnished hereunder shall not in any way relieve CONSULTANT of responsibility for its WORK . CONSULTANT shall remain liable for all errors and omissions regardless of any approvals by COUNTY. 3.7.3. The rights provided herein are nonexclusive and are in addition to any rights the parties may have at law or equity. 3.8. CONSULTANT agrees to perform all WORK in compliance with all applicable laws. 4 of 9 ARTICLE IV – CHANGES TO THE WORK 4.1. Change Order : A document signed by COUNTY authorizing an addition, deletion, or revision in the WORK or an adjustment in the SCOPE price or time limits, or other revision to the AGREEMENT , issued on or after the Effective Date of the AGREEMENT. 4.2. CONSULTANT recognizes and acknowledges that, notwithstanding any provision to the contrary in this contract, CONSULTANT shall not be paid for any Change Order WORK not duly authorized by the COUNTY. ARTICLE V – PAYMENTS AND COMPLETION 5.1. COUNTY shall pay CONSULTANT for WORK as follows: Fee: CONSULTANT’s compensation will be on an hourly fee basis, and a lump sum for the early known deliverables, as described in Exhibits D and E, the hourly rate schedule and Fee Proposal, with a total not-to-exceed limit of Eight million, Nine hundred and Eighty- Five thousand dollars and 00/100 ($8,985,000.00). Individual Task Orders may be executed under this contract for specified projects and tasks, in which the CONSULTANT shall be compensated in accordance with mutually agreed upon Task Orders for which the specific scope, schedule and fee for each job order will be individually negotiated. 5.2. Invoices must be submitted to COUNTY by the 25th of each month to be included in that month’s invoice to COUNTY. CONSULTANT agrees that COUNTY shall not be obligated to pay CONSULTANT for WORK covered by a ny invoice if CONSULTANT submits the invoice more than one hundred eighty (180) days after the date CONSULTANT renders the services, or more than ninety (90) days after this AGREEMENT terminates, whichever is earlier. Payment for services will be remitted to CONSULTANT within thirty (30) days after COUNTY’s receipt of CONSULTANT’s invoice. ARTICLE VI – PROTECTION OF PERSONS AND PROPERTY 6.1. CONSULTANT agrees that it will be solely and continuously responsible for all of its activities and those of its employees or agents on the site where the WORK will be performed with respect to safety. 6.2. CONSULTANT will provide, at its own expense, all personal protective clothing and equipment required for its employees to perform their work in a safe manner and in compliance with all applicable COUNTY -specific and occupational health and safety standards. 6.3. CONSULTANT agrees that COUNTY may take whatever actions deemed necessary in its sole discretion to mitigate any damage to persons and/or property in an emergency situation related to the project or this AGREEMENT. To the extent CONSULTANT has caused or contributed to such situation, CONSULTANT agrees to indemnify COUNTY for all costs incurred. ARTICLE VII – INSURANCE 7.1. CONSULTANT shall, during the performance of this AGREEMENT and for an one-year period thereafter, secure and maintain the following insurance at its own expense: 1. Errors and Omissions - Professional Liability 5 of 9 $1,000,000 per Claim and Aggregate $100,000 or less Deductible 2. General Liability - to include coverage for premises, operations, independent contractors, blanket contractual liability, products completed operations, and personal injury. $1,000,000 Each Occurrence $2,000,000 Aggregate 3. Automobile Liability – Any Auto Owned, Non-owned, and Hired $1,000,000 Limit 4. Excess Liability $1,000,000 Occurrence Form $1,000,000 Aggregate 5. Workers Compensation - Statutory Employers Liability $500,000 Each Accident $500,000 Policy Limit $500,000 Each Employee 7.2. Add COUNTY as additional insured for ongoing and completed operations for General Liability, Automobile Liability and Excess Liability (Umbrella). 7.3. For all of the above, furnish certificates prior to commencement of work. The certificate holder (and additional insured) should read as follows: Jasper County Attention: Finance Department 358 Third Avenue Ridgeland, SC 29936 7.4. The Certificate of Insurance shall expressly state that if there is any material change in coverage (cancellation, expiration, or exclusion of a specifically required coverage such as completed operations) that the certificate holder, Jasper County, will receive at least 30 days’ prior written notice by either a reliable carrier such as FedEx, UPS and alike or by USPS mail using the service of “Return Receipt Requested”. 7.5. The insurance companies providing coverage must be rated “ A-” or better by A. M. Best ’s most recent edition and be admitted and licensed in the CONSULTANT’s state of domicile. Any exceptions to these requirements must be referred to the COUNTY for prior approval. 7.6. To the maximum extent permitted by law, all insurance policies with the exception of Errors and Omissions maintained hereunder shall provide a waiver of subrogation in favor of COUNTY. 6 of 9 7.7. The foregoing requirements are not intended to limit or qualify the liabilities and obligations assumed by CONSULTANT under this AGREEMENT. ARTICLE VIII – TERMINATION OR SUSPENSION 8.1. Termination. 8.1.1. This AGREEMENT may be terminated by COUNTY at any time for the convenience of the COUNTY by written notice to the CONSULTANT specifying the termination date . CONSULTANT shall be paid for WORK completed through the termination date. 8.1.2. COUNTY shall give written notice if CONSULTANT fails to perform its WORK in accordance with the appropriate standard of care, fails to provide WORK in accordance with required schedule, becomes insolvent or files for any form of bankruptcy protection, or is in breach of any material obligations under this AGREEMENT . CONSULTANT must cure any such default within seven (7) days of notice. 8.1.3. If CONSULTANT does not cure the default within the seven (7) days, then COUNTY may terminate this AGREEMENT for cause and may take over the WORK and prosecute same to completion by contract or otherwise, deduct such costs for completion from payments paid or payable to CONSULTANT, and recover from CONSULTANT any shortfall. 8.1.4. If COUNTY should terminate CONSULTANT for cause, and it should thereafter appear by adjudication or otherwise that such a termination was improper, the termination for default will be converted to a termination for the convenience of COUNTY and payment will be made accordingly. In no event shall COUNTY be obligated to compensate CONSULTANT for any termination expenses or damages. 8.1.5. Any contract entered into by the COUNTY shall be subject to cancellation without damages or further obligation when funds are not appropriated or otherwise made available to support continuation of performance in a subsequent fiscal period or appropriated year. 8.2. Suspension. COUNTY may, without cause, order CONSULTANT in writing to suspend, delay or interrupt the WORK, in whole or in part for such period of time as COUNTY may determine. The WORK fees and time may be adjusted for increases in the cost and time caused by suspension, delay, or interruption. ARTICLE IX – CLAIMS AND DISPUTES 9.1. The parties agree to attempt to resolve all claims or disputes arising from or related to this AGREEMENT at a meeting between the senior representatives of each party within five (5) business days of receipt by either party of a notice and description of the dispute. 9.2. If the dispute is not settled under clause 9.1, the parties shall agree to mediate the dispute in compliance with the SC Alternative Dispute Resolution (ADR) rules. The parties shall mutually agree upon the selection of a mediator and bear the costs of the mediation equally. 9.3. Unless provided to the contrary herein CONSULTANT shall continue to perform the WORK and COUNTY shall continue to pay undisputed amounts to CONSULTANT, pending the final resolution of 7 of 9 any dispute or disagreement between COUNTY and CONSULTANT. 9.4. Neither party shall be liable to the other for any special, indirect, punitive, consequential damages including but not limited to loss of profits, loss of use, loss of revenue, loss of capital, loss of goodwill, or any other incidental or consequential damages arising out of the WORK. 9.5. This AGREEMENT is governed by the laws of the state of South Carolina. The venue for any ADR or litigation shall be Jasper County. ARTICLE X – MISCELLANEOUS PROVISIONS 10.1. Assignment: CONSULTANT acknowledges that its services are unique and personal; therefore, its rights under this AGREEMENT may not be assigned or its duties or obligations delegated without the express written consent of COUNTY, which consent shall not be unreasonably withheld. 10.2. Amendment: This AGREEMENT may not be changed, altered, or amended in any way except in writing signed by a duly authorized representative of each party. 10.3. Severability: I f any provision or portion of a provision of this AGREEMENT is declared void or unenforceable, or limited in its application or effect, all other provisions and unaffected portions thereof shall remain fully enforceable; and the parties shall use their best efforts to negotiate a valid and enforceable modification to this AGREEMENT to address any matters affected. 10.4. Headings: The headings of the Exhibits, Sections, Schedules, and Attachments contained in this AGREEMENT are for convenience only and shall not expand, limit, or change the provisions thereof. 10.5. Interpretation - This AGREEMENT shall be interpreted under and governed by the laws of the state in which the project is located. 10.6. Waiver - The failure of the parties to this AGREEMENT to enforce the provisions of this AGREEMENT, or to exercise any option provided herein, shall not be construed to be a waiver of such provisions nor in any way to affect the validity of this AGREEMENT or any part thereof n or the right of the parties to enforce each and every provision thereafter. 10.7. Publication, Publicity and Confidentiality - Articles, papers, bulletins, reports, or other materials reporting the plans, progress, analyses, or results and findings of the work conducted under this AGREEMENT shall not be presented publicly nor published without prior approval in writing from COUNTY. Additionally, representatives of the CONSULTANT are expressly prohibited from releasing any information to the media or any other person about any matter pertaining to this AGREEMENT. Such information is to come from COUNTY. CONSULTANT acknowledges that COUNTY is a political subdivision of the State of South Carolina, and is subject to the South Carolina Freedom of Information Act, S.C. Code 30-4-10 et seq. 10.8. Drug Free Workplace - In accordance with the Drug-Free Workplace Act of 1988, as amended, and as a condition precedent to the execution of this AGREEMENT , the undersigned certifies that CONSULTANT will maintain a drug-free workplace. 10.9. Entire Agreement : This AGREEMENT, together with the attached Exhibits constitutes the entire agreement between COUNTY and CONSULTANT and supersedes all prior written or oral understandings. 10.10. Force Majeure: Neither Party shall be liable for any failure or delay in performance under this 8 of 9 AGREEMENT caused by events beyond the impacted party ’s reasonable control ; including, without limitation: (a) acts of God; (b) flood, fire, earthquake, or explosion; (c) war, terrorist acts, riot or other civil unrest; (d) government order, law, or actions; (e) embargoes or blockades; (f) national or regional emergency; (g) strikes, labor stoppages, or other industrial disturbances; and (h) epidemics or pandemics. The impacted Party shall promptly give notice of the force majeure event to the other Party and shall use diligent efforts to ensure the effects are minimized. The Impacted Party shall resume the performance of its obligations as soon as reasonably practicable after the removal of the cause. (SIGNATURE PAGE BELOW) 9 of 9 IN WITNESS WHEREOF, the parties hereto have made and executed this AGREEMENT as of the date first above written. The signatories attest that each holds the requisite authority to bind their respective parties. Jasper County, South Carolina BY: NAME: TITLE: Infrastructure Consulting & Engineering, LLC BY: NAME: TITLE: Exhibits: Exhibit A: Scope of Services Exhibit B-1: Request For Qualifications Exhibit B-2: ICE Statement Of Qualifications Exhibit C: Program Schedule Exhibit D: Fee Proposal Exhibit E: Hourly Rates Exhibit F: Mandatory Federal Provisions (if working on federally funded projects) EXHIBIT A SCOPE OF SERVICES For Program Management Jasper County Transporta�on Sales Tax Program PURPOSE and BACKGROUND Jasper County voters passed a transporta�on sales tax referendum in November 2024. The County is contrac�ng with Infrastructure Consul�ng and Engineering to provide program and financial management, project management, project planning, scoping, conceptual design, u�lity coordina�on, preliminary right- of-way coordina�on, and construc�on administra�on for the Transporta�on Projects and for civil site improvements associated with the Greenbelt Ini�a�ves iden�fied in the referendum. The Sales Tax Program is described in Exhibit B-1, the Request for Qualifica�ons. The Statement of Qualifica�ons as submited by Infrastructure Consul�ng and Engineering on April 30, 2025 is atached as Exhibit B -2. This was the basis for selec�on and outlines the qualifica�ons, personnel and work approach as Program Manager. The following condi�ons apply to program management consul�ng firm: • Infrastructure Consul�ng and Engineering is excluded from working as the design engineer for any specific project design contract awarded through the sales tax program. • Infrastructure Consul�ng and Engineering is eligible to perform construc�on management and CEI services for projects under the sales tax program. Infrastructure Consul�ng & Engineering (CONSULTANT) has been selected to provide Program Management Services to Jasper County (COUNTY) in support of the 2024 Transporta�on Sales Tax Program. The following shall serve as the ini�al scope of services to support the County in managing the Program and may be amended as mutually agreed upon by both par�es. PROJECTS The CONSULTANT shall provide the following services to aid Jasper County with the management and implementa�on of the following 16 approved projects: 1. S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane widening with mul�- use paths on both sides for approximately 3.8 miles and would be coordinated with the SC 170 Widening and Access Management project ($57,000,000). 2. US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd) : 6- lane road widening for approximate 1 mile ($15,000,000). 3. US 278 Corridor Phase 2 (Argent Blvd to I-95): 6-lane road widening for approximately 4.75 miles (with two bridges, approx. 360 LF and 90 LF) ($50,000,000). 4. SC 46/SC 170/SC 315 Intersec�on Improvements and Widening : assume 1 mile widening with i n t e r s e c � o n i m p r o v e m e n t s a t S C 4 6 a n d S C 1 7 0 t o p o t e n � a l l y c o m b i n e i n t o 1 i n t e r s e c � o n ($30,000,000). 5. US 17/US 321 Intersec�on Improvement : skewed intersec�on in Hardeeville and may contain complicated right of way acquisi�on, assumes exis�ng bridge over railroad can remain ($4,000,000). 6. US 17 Widening (SC 315 to SC 170) : 4- lane divided widening for approximately 2 miles ($24,000,000). 7. S C 3 1 5 W i d e n i n g f r o m S C 1 7 0 / S C 4 6 i n t e r s e c � o n t o U S 1 7: 4 -lane/5-lane widening for approximately 6 miles ($41,500,000). 8. SC 336 Intersec�on Improvements (Grahamville Rd to SC 336) : poten�al realignment of SC 336 for approximately 0.3 mile and poten�al for complicated R/W acquisi�on: ($5,000,000). 9. I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road Improvements: Upgraded interchange included with SCDOT I-95 project from MM 8 to MM 21. Project would include road improvements to US 17, Bees Creek Road, and Glover Road ($12,000,000). 10. I-95 Exit 22 Connector (US 278 to Bees Creek Road) : new road with poten�al new bridge over I - 95, dependent upon alignment and SCDOT’s improvements for Exit 22 for approximate 3 miles: ($36,000,000). 11. Glover Road (Bees Creek Road (S-13) to SC 462): Dirt road and paved road improvement – assume 2 lanes with R/W purchase for future widening ($26,000,000). 12. US 278/SC 652 (Calf Pen Bay Road) Intersec�on Improvement : A tradi�onal intersec�on improvement on US 278 has been installed with le� turn lane and right turn onto SC 652, but improvements were not incorporated on SC 652. Turn lanes with improved intersec�on realignment should be considered or a roundabout s hould be installed as this could be a key intersec�on for traffic calming for entrance to Ridgeland: ($2,000,000). 13. SC 462 (SC 170 to Snake Road): 4-lane divided or 5-lane widening for approximately 3 miles and safety improvements for approximately 5 miles ($56,000,000). 14. US 17/Mackay Point Road Intersec�on: Realignment of S-27-37 to eliminate skewed intersec�on with Mackay Point Road and may involve improved access management on US 17, dependent on coordina�on with SCDOT , assume 0.6 -mile realignment and intersec�on improvement: ($5,000,000). 15. US 321/SC 336 Intersec�on Improvement: skewed intersec�on in Tillman ($2,500,000). 16. Reconstruc�on of Levy Road: ($10,000,000). Greenbelt Ini�a�ves : $94,000,000 for financing greenbelt ini�a�ves (including but not limited to, purchasing property for conserva�on, purchasing conserva�on easements, crea�ng passive greenspace, crea�ng ac�ve greenspace, protec�ng natural resources, protec�ng agricul tural or heritage landscapes, and protec�ng scenic corridors). Management of the Greenbelt Ini�a�ves is NOT part of the Consultant’s scope, except for the civil site improvements associated with the Greenbelt Ini�a�ve projects. Jasper County officials have determined the preliminary unofficial top roadway priori�es to be as follows: 1. S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane widening with mul�- use paths on both sides for approximately 3.8 miles and would be coordinated with the SC 170 Widening and Access Management project ($57,000,000). 2. US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd) : 6- lane road widening for approximate 1 mile ($15,000,000). 3. US 278 Corridor Phase 2 (Argent Blvd to I-95): 6-lane road widening for approximately 4.75 miles with two bridges (approx. 360 LF and 90 LF) ($50,000,000). 4. I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road Improvements: Upgraded interchange included with SCDOT I-95 project from MM 8 to MM 21. Project would include road improvements to US 17, Bees Creek Road, and Glover Road ($12,000,000). 5. Reconstruc�on of Levy Road: ($10,000,000). 6. SC 336 Intersec�on Improvements (Grahamville Rd to SC 336) : poten�al realignment of SC 336 for approximately 0.3 mile and poten�al for complicated R/W acquisi�on: ($5,000,000). SCOPE OF SERVICES The CONSULTANT shall provide the following services to aid Jasper County with the management and implementa�on of the 1. Task 1 – Project Management Services a. Assist the County in obtaining Local Public Agency (LPA) status with South Carolina Department of Transporta�on (SCDOT). Act as an extension of County staff and provide the needed services to the County for compliance with SCDOT LPA procedures for projects involving state and/or federal funds. b. Coordinate, manage, and review project plans, technical reports, specifica�ons, and es�mates prepared by project design consultants providing professional services to the County , for consistency with contract budgets, schedules, scope of work, design criteria, and applicable standards. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. c. Project cost es�mates will be reviewed, veted and updated annually to keep pace with market trends. d. Prepare independent cost es�mates for professional services for each project and assist the County with scope, schedule, and fee nego�a�ons with project design consultants, also to include the civil site improvements associated with the Greenbelt Ini�a�ves. e. Review project design consultant invoices for accuracy, compliance with contract terms, and progress of the work. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. f. Conduct mee�ngs, monitor design progress, and keep the County informed of each project’s status. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. g. Coordinate with municipali�es, environmental agencies, and other project stakeholders as applicable to secure necessary approvals and permits prior to the construc�on le�ng. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. h. Ensure that all necessary permits and environmental approvals are obtained prior to le�ng a project for construc�on. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. i. Ensure that all rights and easements necessary for the project are acquired prior to the construc�on le�ng. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. j. Ensure that all u�lity coordina�on ac�vi�es necessary to facilitate project construc�on have been performed prior to the construc�on le�ng. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. k. Perform technical, constructability, and maintainability reviews, including life cycle costs, accessibility, equipment clearances, etc. prior to the construc�on le�ng. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. l. Responsible for overseeing the prepara�on of construc�on bid documents by the project design consultants, including the review of plans, specifica�ons, es�mates of quan��es, bid schedules invita�ons to bid or request for proposals that shall comply with the County procurement code. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. m. Conduct pre -bid mee�ngs, review bids, and advise the County through selec�on and contract award process. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. n. Coordinate and/or conduct value engineering studies and recommenda�ons as may be requested to reduce construc�on costs. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. o. Review and maintain project related correspondence and files. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. p. Perform public outreach ac�vi�es including public mee�ng facilita�on, mailer and handout design, coordinate response to public comments and mee�ngs, or as required. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. 2. Task 2 – Program and Financial Management a. Provide a writen monthly Program Status Report for County staff and Council, due by 12:01p.m. local �me on the 15th of each month. b. Atend all mee�ngs associated with the program as directed by the County. c. Prepare a Program Management Plan t h a t w i l l s e r v e a s t h e p l a y b o o k f o r t h e e n � r e s a l e s t a x program. This document will outline governance, communica�on protocols, public informa�on and repor�ng strategies, risk management strategies, quality control measures, and every aspect of program execu�on. d. Prepare a Master Program Schedule that sequences all projects over the 15 -year period, using logical priori�es, dependencies, and funding flows. The master schedule shall integrate individual cri�cal path method project schedules into a program -wide Gant chart that clearly shows and tracks cri�cal tasks and deadlines a for the design, right of way acquisi�on, permi�ng, and construc�on for all projects within the program and the �meline for Greenbelt acquisi�ons/improvements. This will be updated quarterly and as projects progress. e. Develop and maintain a Program Financial Plan to forecast Program revenues, project expenditures, and cash balances. The financial plan shall be in accordance with the CIP and the Consultant will par�cipate in the County’s annual CIP planning process. Revenue and cash reports will be County derived and maintained. f. Provide quarterly financial reports to include revenues, encumbrances, and expenditures, due 30 days a�er the end of the quarter, using data provided by the County Finance Department. g. Develop and implement a Public Involvement Plan which shall include a Program website, strategic use of social media, holding public mee�ngs as requested to provide accurate, up to date project informa�on to the ci�zens of Jasper County. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. h. Develop and manage a dedicated Program Website, hosted and maintained by the Consultant with a link to/from the County’s web site, to display program informa�on, project updates, interac�ve maps, �melines, and financial summaries, FAQ as well as an op�on for ci�zens to ask ques�on or provide input. i. Develop and implement a project Data Management System that provides readily accessible, complete, and well-organized files for each project. j. Provide the County with recommenda�ons for the �ming and amount of bond issuances, based upon the Program Financial Plan. k. Review and recommend methods to maximize efficiency and achieve economies of scale in the procurement of projects. l. Develop consistent design criteria, standards, and specifica�ons for use on projects developed by the Program where needed due to no available or applicable SCDOT design criteria or SCDOT standard specifica�ons. m. Inves�gate, recommend, and pursue upon direc�on form the County, available Grant Opportuni�es on behalf of the County. n. Develop and implement a public involvement program which should include, at a minimum, a Program website hosted and maintained by the Consultant with a link to the County’s web site, and use of social media to provide accurate, up to date project informa�on to the ci�zens of Jasper County. This shall include civil site improvements associated with the Greenbelt Ini�a�ves. o. Assist with document produc�on related to Freedom of Informa�on Act (FOIA) requests and other requests for informa�on as applicable. p. Assist with the development of encroachment permits, intergovernmental agreements (IGA), memorandums of understanding (MOU), memorandums of agreement (MOA) and financial par�cipa�on agreement (FPA) to facilitate coordina�on with the SCDOT, South Carolin a State Infrastructure Bank (SCSIB) and other applicable par�es as needed. q. Determine a method to evaluate project risk and cost, conduct risk analysis as needed, and make recommenda�ons based on analysis. (Risk analysis per SOQ) r. Conduct bid analysis/evalua�on of bids or prepare cost es�mates for comparison when appropriate. Provide construc�on cost es�mate when requested. 3. Task 3 – Project Planning, Scoping, and Conceptual Design Establish the scope of improvements, cost es�mates, and baseline cost-loaded schedules for each project including the following subtasks. This shall include the civil site improvements associated with the Greenbelt Ini�a�ves. A. Development of Conceptual Project Design o Perform feasibility and ini�al constructability review of a conceptual design and scope of each project. Provide baseline costs and schedule, to include design, right -of-way, construc�on, u�lity coordina�on, u�lity reloca�on, and permi�ng. o The conceptual designs shall be developed in accordance with the South Carolina Department of Transporta�on (SCDOT) Highway Design Manual and the American Associa�on of State Highway and Transporta�on Officials (AASHTO) “A Policy on Geometric Design of Highways and Streets”. o Conceptual designs shall be developed on aerial photography and available GIS. Design features to be illustrated shall include the proposed roadway typical sec�ons, roadway alignments, lane configura�ons, auxiliary intersec�on turn lanes, and bicycle & pedestrian facili�es. The conceptual designs shall be presented on color roll- plots for coordina�on with project stakeholders and on 11” x 17” size sheets for incorpora�on into a project planning report. o Work to minimize impacts to private property, buildings, cultural features (churches, cemeteries, parks, etc.), major u�li�es, and natural resources in the development of the project conceptual designs. COUNTY GIS property lines shall be referenced into the conceptual design to es�mate right of way impacts for each project. Impacts on buildings and cultural features shall be es�mated from aerial photography and a project field review. o Perform an environmental screening to determine the presence of likely hazardous material sites, threatened and endangered species, historical/cultural resources, floodplains, and jurisdic�onal wetlands within the project area. The presence of these environmental constraints will be determined through a windshield survey and database searches. o Iden�fy the expected permits and NEPA compliant environmental document (Categorical Exclusion, Environmental Assessment, or Environmental Impact Statement) required for each project based on conceptual design and environmental screening. B. Baseline Cost Es�mates and Schedules o Prepare a cost es�mate for each project based on the conceptual project design. Project cost es�mates shall represent the total cost of project development and include the following typical project costs: • Engineering services (planning and design), • Right of way acquisi�on (land and services), • Wetland mi�ga�on, • U�lity reloca�on (u�li�es with prior rights), • Construc�on, • Construc�on engineering & inspec�on. o Appropriate factors shall be applied in coordina�on with the COUNTY to provide for con�ngency within each project budget to address unforeseen condi�ons. o Baseline schedules to be developed for each project shall include the project phases of planning and design, right of way acquisi�on, environmental permi�ng, u�lity coordina�on, construc�on procurement, and construc�on. Cost es�mates associated w i t h e a c h o f t h e s e p r o j e c t p h a s e s s h a l l b e u s e d t o c r e a t e a c o s t l o a d e d s c h e d u l e f o r purposes of program financial planning. o Evaluate projects through a cost -risk analysis to iden�fy risks to the project scope or schedule which may significantly impact project cost. A cost -risk workshop will be conducted for each project to engage subject mater experts in a review of the projects to iden�fy poten�al risks based on their experience with transporta�on project development in the area. The project cost es�mate will be refined to account for the magnitude and likelihood of each iden�fied risk. C. Environmental Overview o Prepare a Project Planning Report for each project to present the conceptual design, environmental overview, u�lity overview, cost es�mate, and schedule. The reports shall contain the following informa�on: • Dra� Purpose and Need Statement, • Project Descrip�on, • Design Criteria, • Conceptual Design, • Project Loca�on and Length, • Environmental Constraints • Iden�fy the Required NEPA Environmental Document, • Iden�fy the Required Environmental Permits, • U�lity Informa�on • Cost Es�mate • Schedule o These reports will be submited to the County and SCDOT (if applicable) for review and comment. All comments will be addressed as applicable in a comment response matrix and revised final reports will be provided to the County. D. Plan Review o For projects on SCDOT roadways or within SCDOT ROW , the consultant shall conduct a cursory review prior to submital to SCDOT. The review will ensure that plans sa�sfy SCDOT requirements and foreseeable errors are addressed. Detailed review of design and/or calcula�ons will not be required. o For projects in the County or municipal system (not encroaching into SCDOT rights of way), the consultant will act as the County reviewer and will review for design, calcula�on, adherence to appropriate standards and specifica�ons, and constructability. o If plans require submital to County planning or other departments for review, then the Consultant will facilitate those submitals and communicate as needed. 4. Task 4 – U�lity Coordina�on Services a. Prepare a U�lity Coordina�on Plan for the Program, to guide the procedures for an ongoing process from concep�on to construc�on, to include Proac�ve Conflict Iden�fica�on, Collabora�on & Communica�on, Data -Driven Decisions, Risk Assessments and Mi�ga�on Strategies, & Con�ngency Planning and Budge�ng, Regular Joint Mee�ngs, and Legal Rights and Contractual Agreements. b. No�fy all known u�lity owners in the area of the projects and iden�fy those u�li�es with exis�ng and proposed facili�es in the project areas. c. Facilitate and act as intermediary between project design team and u�lity representa�ves. d. Hold regular joint u�lity mee�ngs with u�lizes once ini�al projects begin design phase. e. Arrange for Project Design teams to employ Subsurface U�lity Engineering (SUE) to establish u�lity loca�ons and iden�fy conflicts . f. Obtain leters of “no-conflict” for those u�li�es which are not impacted. g. Coordinate with u�lity owner(s) and designer(s) to develop reloca�on plans for those conflicts which cannot be eliminated. h. Review all u�lity owners’ reloca�on plans to ensure that reloca�ons proposed by one owner do not conflict with another’s reloca�on. i. Establish prior rights of occupancy. j. Obtain no-cost leters from those u�lity owners without prior rights or develop u�lity agreements with those owners who can document their prior rights. k. Evaluate the feasibility of in -contract u�lity reloca�on and develop necessary agreements in coordina�on with the u�lity owner. l. Develop Contractual Provisions and Incen�ves: • Clear U�lity Reloca�on Clauses: Incorporate explicit clauses in construc�on contracts that clearly define responsibili�es for u�lity coordina�on, reloca�on, and unexpected discoveries. • In u�lity agreements consider incen�ves for early reloca�on and penal�es for unreasonable delays. m. Monitor the progress of u�lity reloca�on and incorporate u�lity reloca�on schedules into the overall project schedule and master program schedule. n. This shall include U�lity Coordina�on Services for civil site improvements associated with the Greenbelt Ini�a�ves. 5. Task 5 – Program Construc�on Administra�on a. Constructability reviews of plans and specifica�ons prepared for projects prior to construc�on le�ng. b. Atend pre-construc�on conferences, rou�ne construc�on coordina�on mee�ngs, etc. c. Reviewing and maintaining records of plans, specifica�ons, shop drawings, revisions, correspondence, warran�es, etc. d. Monitor each construc�on project and prepare monthly status reports. e. Evalua�ng and recommending ac�ons related to progress payments, change requests, claims, disputes, etc. f. Performing project close-out ac�vi�es. g. Fostering and maintaining a posi�ve public image related to construc�on opera�ons by proper interac�on with the public and media, maintenance of traffic, aten�on to safety, permit compliance, etc. h. This shall include Construc�on Administra�on for civil site improvements associated with the Greenbelt Ini�a�ves. 6. Task 6 - Right of way Acquisi�on Services The CONSULTANT will perform Right -of-Way Acquisi�on Phase Services for the COUNTY on the Transporta�on Sales Tax projects on an as needed basis. The Right-of-Way Services include the following items: The CONSULTANT may be required to: a. Prepare a Right of Way Acquisi�on Plan for the Program, to supplement the applicable procedures and policies outlined in the SCDOT Right -of-Way Acquisi�on Manuals, as may be warranted for iden�fying easement and right of way needs, procurement of appraisals and �tle research, property owner contact, and other necessary tasks as requested by the County. b. Provide Right-of-Way services to coordinate, plan, direct, and control R-O-W ac�vi�es necessary to legally acquire and record R-O-W needed for construc�on, ensuring that all R-O-W acquired for federally assisted projects complies with the Uniform Reloca�on Assistance and Real Property Acquisi�on Policies Act of 1970 (Public Law 91-646), as amended; and that all R-O-W acquired for state assisted projects complies with Titles 57 and 28 of the S. C. Code of Laws, as amended; and that all Right-of-Way acquired complies with all other applicable laws, ordinances, regula�ons, policies, etc. c. Forecast and es�mate Right -of-Way acquisi�on schedules and Right-of-Way cash flow expenditures and �melines for acquisi�on. The following services will be performed on an as-needed basis for the individual projects, and scopes and fees will be provided to the COUNTY for each Right-of-Way Acquisi�on assignment. a. Perform �tle search and provide �tle opinions for parcels requiring acquisi�on. b. Provide appraisal cost es�mates for acquisi�ons, by a South Carolina licensed appraiser. c. Procure or perform appraisals and review the appraisals provided by others. d. Nego�ate acquisi�ons, providing a translator when necessary. e. Li�ga�on is not included in the scope of services and will be provided through the Jasper County Atorney's Office. EARLY KNOWN DELIVERABLES BY THE CONSULTANT No. Task Deliverable Descrip�on Due Date (Calendar Days a�er NTP) 1 2.c. Program Management Plan 120 2 2.d. Master Program Schedule 90 3 2.e. Program Financial Plan 90 4 2.g. Public Involvement Plan 60 5 2.h. Program Web Site Development and Startup 60 6 2.i. Data Management Plan / System 60 7 2.l. Design Criteria and Standards 60 8 2.q. Risk Analysis Method 60 9 4.a. U�lity Coordina�on Plan 60 10 6.a. R/W Acquisi�on Plan 90 SCHEDULE The CONSULTANT shall provide these services for a period of five (5) years as shown in Exhibit C - Schedule and may be amended during that as mutually agreed to add services . This agreement may be extended at the end of five years by mutual agreement between the COUNTY and the CONSULTANT. FEE Program Management Services (Tasks 1 - 6) shall be invoiced on an hourly fee basis, and a lump sum for the early known deliverables, not-to-exceed $ 8,985,000.00 over the five year term of the contract . Individual Task Orders may be executed under this contract for specified projects and tasks . The CONSULTANT shall be compensated in accordance with mutually agreed upon Task Orders for which the specific scope, schedule and fee for each job order will be individually nego�ated. REQUEST FOR QUALIFICATIONS (RFQ) RFQ #2025 –03 Program Manager – Transportation Sales Tax Program Advertised: March 17, 2025 RFQ Due: April 30, 2025 EXHIBIT B-1 Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 2 I. GENERAL INFORMATION Jasper County is soliciting responses from qualified engineering firms (“Offerors” or “Contractors”) licensed in South Carolina to provide Program Management and Civil Engineering related professional services as further described herein. RFQ MUST BE PHYSICALLY RECEIVED, AS INDICATED BELOW, BY 3:00PM ON Wednesday, April 30, 2025. Issue Request for Qualifications (RFQ) March 17, 2025 Pre-Submittal Conference April 9, 2025, 1 pm Deadline for Inquires April 11, 2025, 1 pm Response to Inquiries April 16, 2025 Deadline for Submitting Proposal April 30, 2025, 1 pm II. INSTRUCTIONS TO BIDDERS 1. Pre-Submittal Conference The County will conduct an in-person Non-Mandatory Pre-Submittal conference as part of this process to provide additional project information and expound upon potential questions. This conference will be held on Wednesday, April 9, 2025 at 1:00 PM in Jasper County, Clementa Pinckney Government Building, County Council Chambers, Third Floor, 358 Third Avenue, Ridgeland, SC 29936. Attendance is not mandatory, all interested firms are strongly encouraged to attend. Any questions regarding this project must be submitted in writing via email no later than Friday April 11, 2025, by 1:00 PM. Questions should be emailed to jiwanicki@jaspercountysc.gov. All submitted questions will be addressed and posted on Jasper County’s Bids and Solicitations Web Page https://www.jaspercountysc.gov/services/bids-and-solicitations and the Jasper County Vendor Registry website/ April 16, 2025. 2. Proposal Opening Location The Proposals will be publicly opened at the Jasper County, Clementa Pinckney Government Building, County Council Chambers, Third Floor, 358 Third Avenue, Ridgeland, SC 29936. Proposals will be opened on the due date, Wednesday, April 30, 2025 at 1:00 pm. Only the names of Offerors will be provided at the opening. No other information will be shared at that time. All Offerors or their representatives are invited to attend the proposal opening. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 3 3. Submittals Jasper County is hereby issuing this Request for Qualifications (RFQ) to firms that have the capability and interest in undertaking and performing the scope of work described in this RFQ. The RFQ is being publicly advertised in accordance with Jasper County procurement guidelines. Each firm responding to this solicitation is officially a RESPONDENT or PROPOSER. Each respondent must submit a sealed package containing original and eight (8) copies of the RFQ. In a separate sealed package original and two (2) copies of the Fee Schedule. All submissions will be logged in and date and time stamped. Printed submittals must be clearly labeled on the outside of the envelope with the following wording: a. For the RFQ: JASPER COUNTY RFQ #2025 – 03 March 17, 2025 RFQ DOCUMENTS b. For the Fee Schedule: JASPER COUNTY RFQ #2025 – 03 March 17, 2025 Fee SCHEDULE All late submittals will be rejected. Jasper County, South Carolina is not responsible for late submissions caused by delays in mail delivery or a delay in any other method of delivery. Print size shall be 12 pt. font minimum, on 8½ by 11 paper, double-sided and must include all of the information required in this RFQ. Provide a cover page that includes: Company Name, Address, Point of Contact (Email Address and Phone Number, and Date of Submission. SUBMITTALS SHALL NOT EXCEED A TOTAL OF 75 PAGES. A PAGE IS CONSIDERED TO BE ONE SIDE OF A SHEET OF PAPER IF PRINTED. EXCEEDING THE PAGE LIMIT IS GROUNDS FOR REJECTION OF THE SUBMITTAL. The following WILL NOT be counted as pages: a. Front and/or back cover pages of your Qualifications document b. Table of Contents for your Qualifications document c. Section Dividers for your Qualifications document d. AFFIDAVIT OF COMPLIANCE document e. Fee Schedule/Proposal - Submitted Separately from the Qualifications If you have any questions on the above page limit information email iiwanicki@jaspercountysc.gov . Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 4 4. Proposed Procurement Timeline Release date for RFQ March 17, 2025 Pre-Submittal Conference April 9, 2025 Final Date to Receive Written Questions April 11, 2025 Addenda to Answer Questions April 16, 2025 RFQ Closing Date April 30, 2025 Completion of Selection Committee Review and Recommendation May 21, 2025 Jasper County Council June 2, 2025 Execution of Contract June 16, 2025 5. Sealed and Marked If sent by mail, or hand-delivered, original signed Proposals shall be submitted in a sealed package, clearly marked on the outside of the package with RFP #2025 – 3 PROGRAM MANAGER and addressed to: Kimberly Burgess, Procurement Officer Director, Administrative Services Division Jasper County 358 Third Avenue, Suite 304 P.O. Box 1149 Ridgeland, SC 29936 It is the proposer’s sole responsibility to deliver the proposal to the Jasper County Administrative Services Division Procurement Office for receipt on or before the due date and time indicated. If a Proposal is delivered by U.S. Mail, the Proposer shall be responsible for its timely delivery to the Procurement Office. Proposals delayed by mail shall not be considered and shall be rejected. Proposals may be mailed to the Procurement Office and accepted if the signed Proposal forms and required submittals are mailed and received prior to the due date and time. Proposals submitted via email will not be accepted. All submissions will be logged in and date and time stamped. Any Qualifications received after the date and time specified will be logged and date and time stamped as "late" and will remain unopened. and returned unopened to the respondent. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 5 6. Legal Name and Signature Proposals shall clearly indicate the legal name, address, and telephone number of the Proposer. Proposals shall be manually signed above the printed name and title of signer on the Affidavit of Compliance page. The signer shall have the authority to submit Proposals on behalf of the Proposer. Failure to properly sign the Proposals form shall invalidate the Proposals and it shall not be considered for award. 7. Clarification and Addenda Each Proposer shall examine REQUEST FOR QUALIFICATIONS documents. The Administrative Services Division, Procurement Officer shall not be responsible for interpretations or clarifications of Project Scope. All inquiries or suggestions, concerning interpretation, clarification, or additional information pertaining to the Project Scope shall be made in writing or through email to: Jim Iwanicki, Engineering Services Director Jasper County 623 Live Oak Drive P.O. Box 1244 Ridgeland, SC 29936 jiwanicki@jaspercountysc.gov Any inquiries or suggestions, concerning clarification of the REQUEST FOR QUALIFICATIONS (excluding Project Scope) shall be made through the Procurement Officer in writing or through email to: Kimberly Burgess, Procurement Officer Director, Administrative Services Jasper County 358 Third Avenue, Suite 304 P.O. Box 1149 Ridgeland, SC 29936 kburgess@jaspercountysc.gov 8. Responsive and Responsible Proposals To be responsive, the proposal shall conform in all material respects to the requirements set forth in the REQUEST FOR QUALIFICATIONS. To be responsible, the proposal shall perform fully the requirements, experience, reliability, capacity, and equipment that will ensure good faith performance. 9. Reserved Rights Jasper County reserves the right to make such investigations as it deems necessary to make the determination of the proposer’s responsiveness and responsibility. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 6 10. Applicable Law All applicable laws and regulations of the United States of America, the State of South Carolina and Jasper County will apply to any resulting agreement, contract, or purchase. 11. Right to Protest Appeals and remedies are provided for in the Jasper County Purchasing and Contracting Ordinance, Article V , Jasper County Code of Ordinances. 12. Contract Forms Any agreement, contract, or purchase order resulting from the acceptance of a Proposal shall be on forms either supplied by or approved by the Jasper County Procurement Officer. 13. Forms, Alternates, Variances Proposals must be submitted on the attached REQUEST FOR QUALIFICATIONS forms, although additional information may be attached. The Offerors must indicate any variance from the requested scope of services and/or terms and conditions, on the RFQ Affidavit of Compliance. Otherwise, Offerors must fully comply with the requested Scope of Services, terms and conditions. Alternate Proposals may or may not be considered at the sole discretion of Jasper County. 14. Proposal Prices Provide an Hourly Rate Schedule for each billable title within the firm, mark-up costs for subconsultants, vendors, and suppliers, etc.., and a schedule of reimbursable costs and rates. Each item must be proposed separately, and no attempt is to be made to tie any item(s) in with any other item or items. 15. Descriptive Information All equipment, materials, and articles incorporated in the product/work covered by this REQUEST FOR QUALIFICATIONS are to be new and of suitable grade for the purpose intended. 16. Deviations to Scope of Work and Requirements Any deviation from the scope of work as written and accepted by the County may be grounds for termination of the Contract. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 7 Quality If any work product delivered does not meet applicable scope of work, or if the work product does not meet industry standard performance and professionalism, the Contractor shall redo the work at no expense to Jasper County. Contractor shall refund to the County any money which has been paid to the Contractor for any work not redone to meet industry standards and professionalism. The Contractor shall be responsible for attorney fees in the event the Contractor defaults and court action is required. The County reserves the right to reject any or all materials/equipment if, in its judgement, the item reflects unsatisfactory workmanship, manufacturing, or shipping damages. 17. Regulations It shall be the responsibility of the Consultant to ensure compliance with Federal, State of South Carolina, and County laws, rules, regulations, or other requirements, as may apply. 18. Termination of Award Failure of the Consultant to satisfy the requirements of Jasper County shall be reason for termination of the award. Any Proposal may be rejected in whole or in part for good cause when in the best interest of the County. 19. Royalties and Patents The successful Consultant shall pay all royalties and license fees for equipment or process in conjunction with the equipment being furnished. Consultant shall defend all suits or claims for infringement of any patent right and shall hold the County harmless from loss on account or cost and attorney’s fees incurred. 20. Inspection and Acceptance No item(s) received by the County pursuant to this contract shall be deemed accepted until the County has had reasonable opportunity to inspect the item(s). Any item(s) discovered defective, or which do not conform to any warranty of the seller upon inspection may be returned at the seller’s expense for full credit or replacement. If later, defects are discovered which were not ascertainable upon the initial inspection, the item(s) may also be returned at the Seller’s expense for full credit or replacement. The County’s return of defective items shall not exclude any other legal, equitable or contractual remedies the County may have. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 8 III. GENERAL TERMS AND CONDITIONS 1. Exceptions to Specification Offerors taking exception to any part or section of the specifications shall indicate such exceptions on the Affidavit of Compliance Form and continuation page(s), if necessary. Failure to indicate exceptions shall be interpreted as the Proposer’s intent to fully comply with the specifications as written. 2. Evaluation of Proposals Any Purchase Order or Purchase Sales Agreement resulting from this REQUEST FOR QUALIFICATIONS shall be awarded to the PROPOSER providing the best proposal as determined by Jasper County, South Carolina. AWARD WILL NOT BE MADE ON THE BASIS OF PRICE. The committee will have representatives from the County, City of Hardeeville, Town of Ridgeland, and Jasper County School District. Responses will be evaluated using the following criteria: A. Qualifications, Abilities, and Experience of Key Personnel (35%) - Each firm will be evaluated on the experience and qualifications of the key personnel that will be assigned to the Program Management Team. B. Experience of the Firm and References (35%) - Each firm shall be evaluated on its demonstrated capabilities and experience to provide the desired services. Review will include but not be limited to past performance on similar types of work, quality of work, and adherence to schedules and other related factors. History of working with municipalities and other local governments will also be considered. Review will include review of any subcontractors specified in Offeror’s submittal as well. C. Succession Planning (20%) – Each firm will be evaluated on its ability to provide quality service during a change in the Project Team’s key personnel. D. Proposal Quality (10%) - Each firm will be evaluated on how the RFQ was put together and the readability of the document. After initial scoring of the above criteria, the County reserves the right to select a short list of finalists for a presentation/interview. Results of the interview process shall factor into the final scoring for contract award. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 9 3. Award Each factor of the evaluation will be considered relative to obtaining the most effective plan consistent with the needs of the County. 4. Product Liability Insurance The successful proposal will supply proof of professional liability insurance and workers compensation. IV. SCOPE OF SERVICES 1. Project Purpose Jasper County voters passed a transportation sales tax referendum that passed in November 2024. The County seek proposals from firms qualified to provide program and financial management, project management, project planning, scoping, conceptual design, utility coordination, and preliminary right-of-way coordination for Transportation Projects for the proposed 2024 1% Transportation Sales and Use Tax and for civil site improvements associated with the Greenbelt Initiatives identified in this RFQ. The sales tax program is included as an attachment. Responses to the solicitation for Program Management should be consider the following: • The firm selected for Program Management will be excluded from working as the design engineer for any design contract awarded through the sales tax program. • Selected Program Manager may be able to perform construction management and CEI services for projects under the sales tax program. 2. Scope of Work Task 1 – Project Management Services • Assist the County in obtaining Local Public Agency (LPA) status with South Carolina Department of Transportation (SCDOT). • Act as an extension of County staff and provide all the needed services to the County to comply with SCDOT’s LPA requirements. • Coordinate, manage, and review project plans, technical reports, specifications, and estimates prepared by consultants providing professional services to the County for consistency with contract budgets, schedules, scope of work, design criteria, and applicable standards. This would include civil site improvements associated with the Greenbelt Initiatives. • Prepare independent estimates for professional services and assist the County with scope and fee negotiations with project design consultants also to include civil site improvements associated with the Greenbelt Initiatives. • Review project design consultant invoices for accuracy, compliance with Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 10 contract terms, and progress of the work. This would include civil site improvements associated with the Greenbelt Initiatives. • Conduct meetings, monitor design progress, and keep the County informed of each project’s status. This would include civil site improvements associated with the Greenbelt Initiatives. • Ensure compliance with SCDOT LPA procedures for projects involving state and/or federal funds. • Ensure that all necessary permits and environmental approvals are obtained prior to letting a project for construction. This would include civil site improvement s associated with the Greenbelt Initiatives. • Ensure that all rights and easements necessary for the project are acquired prior to the construction letting. This would include civil site improvement associated with the Greenbelt Initiatives. • Ensure that all utility coordination activities necessary to facilitate project construction have been performed prior to the construction letting. This would include civil site improvements associated with the Greenbelt Initiatives. • Responsible for overseeing the preparation of construction bid documents. This would include civil site improvements associated with the Greenbelt Initiatives. • Conduct pre-bid meetings, review bids, and advise the County through selection and contract award. This would include civil site improvement s associated with the Greenbelt Initiatives. • Review and maintain project related correspondence and files. This would include civil site improvements associated with the Greenbelt Initiatives. • Coordinate value engineering studies and recommendations. This would include civil site improvements associated with the Greenbelt Initiatives. • Perform technical, constructability, and maintainability reviews, including life cycle costs, accessibility, equipment clearances, etc. This would include civil site improvement associated with the Greenbelt Initiatives. • Coordinate with municipalities, environmental agencies, and other project stakeholders as applicable to secure necessary approvals and permits. This would include civil site improvements associated with the Greenbelt Initiatives. • Perform public outreach activities including public meeting facilitation, mailer and handout design, coordinate response to public comments and meetings, or as required. This would include civil site improvements associated with the Greenbelt Initiatives. Task 2 – Program & Financial Management • Provide a written monthly Program Status Report for County staff and Council due by 12:01p.m. local time on the 15 th of each month. • Attend all meetings associated with the program as directed by the County. • Provide quarterly financial reports to include revenues, encumbrances, and expenditures. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 11 • Develop and maintain a Program Financial Plan to forecast Program revenues, project expenditures, and cash balances. The financial plan shall be in accordance with the CIP and the Consultant will participate in the County’s annual CIP planning process. Rev enue and cash reports will be County driven and maintained. • Provide the County with recommendations for the timing and amount of bond issuances based upon the Program Financial Plan. • Develop and maintain cost loaded schedules for the design, right of way acquisition, permitting, and construction for all projects within the program. • Develop and implement a project filing system that provides readily accessible, complete, and well-organized files. • Review and recommend methods to maximize efficiency and achieve economies of scale in the procurement of projects. • Develop consistent design criteria, standards, and specifications for use on projects developed by the Program. • Investigate and pursue available grant opportunities on behalf of the County. • Develop and implement a public involvement program which should include, at a minimum, a Program website hosted and maintained by the Consultant with a link to the County’s web site, and use of social media to provide accurate, up to date project information to the citizens of Jasper County. This would include civil site improvements associated with the Greenbelt Initiatives. • Assist with document production related to Freedom of Information Act (FOIA) requests and other requests for information as applicable. • Assist with the development of encroachment permits, intergovernmental agreements (IGA), memorandums of understanding (MOU), memorandums of agreement (MOA) and financial participation agreement (FPA) to facilitate coordination with the SCDOT, South Carolin a State Infrastructure Bank (SCTIB) and other applicable parties as needed. • Determine a method to evaluate project risk and cost, conduct risk analysis as needed, and make recommendations based on analysis. • Conduct bid analysis/evaluation of bids or prepare cost estimates for comparison when appropriate. Provide “engineers estimate” when requested. • Other items assigned by Jasper County. Task 3 – Project Planning, Scoping, and Conceptual Design • Establish the scope of improvements, cost estimates, and baseline cost -loaded schedules for each project including the following subtasks. This would include civil site improvements associated with the Greenbelt Initiatives. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 12 A. Development of Conceptual Project Design o Perform feasibility and initial constructability review of a conceptual design and scope of each project. Provide baseline costs and schedule, to include design, right-of-way, construction, utility coordination , utility relocation, and permitting. o The conceptual designs shall be developed in accordance with the South Carolina Department of Transportation (SCDOT) Highway Design Manual and the American Association of State Highway and Transportation Officials (AASHTO) “A Policy on Geometric Design of Highways and Streets”. o Conceptual designs shall be developed on aerial photography and available GIS. Design features to be illustrated shall include the proposed roadway typical sections, roadway alignments, lane configurations, auxiliary intersection turn lanes, and bicycle & pedestrian facilities. The conceptual designs shall be presented on color roll -plots for coordination with project stakeholders and on 11” x 17” size sheets for incorporation into a project planning report. o Work to minimize impacts to private property, buildings, cultural features (churches, cemeteries, parks, etc.), major utilities, and natural resources in the development of the project conceptual designs. COUNTY GIS property lines shall be referenced into the conceptual design to estimate right of way impacts for each project. Impacts on buildings and cultural features shall be estimated from aerial photography and a project field review. o Perform an environmental screening to determine the presence of likely hazardous material sites, threatened and endangered species, historical/cultural resources, floodplains, and jurisdictional wetlands within the project area. The presence of these envir onmental constraints will be determined through a windshield survey and database searches. o Identify the expected permits and NEPA compliant environmental document (Categorical Exclusion, Environmental Assessment, or Environmental Impact Statement) required for each project based on conceptual design and environmental screening. B. Baseline Cost Estimates and Schedules o Prepare a cost estimate for each project based on the conceptual project design. Project cost estimates shall represent the total cost of project development and include the following typical project costs: o Engineering services (planning and design), o Right of way acquisition (land and services), o Wetland mitigation, o Utility relocation (utilities with prior rights), o Construction, o Construction engineering & inspection. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 13 o Appropriate factors shall be applied in coordination with the COUNTY to provide for contingency within each project budget to address unforeseen conditions. o Baseline schedules to be developed for each project shall include the project phases of planning and design, right of way acquisition, environmental permitting, utility coordination, construction procurement, and construction. Cost estimates associated with each of these project phases shall be used to create a cost loaded schedule for purposes of program financial planning. o Evaluate projects through a cost -risk analysis to identify risks to the project scope or schedule which may significantly impact project cost. A cost -risk workshop will be conducted for each project to engage subject matter experts in a review of the projects to identify potential risks based on their experience with transportation project development in the area. The project cost estimate will be refined to account for the magnitude and likelihood of each identified risk. C. Environmental Overview o Prepare a Project Planning Report for each project to present the conceptual design, environmental overview, utility overview, cost estimate, and schedule. The reports shall contain the following information: o Draft Purpose and Need Statement, o Project Description, o Design Criteria, o Conceptual Design, o Project Location and Length, o Environmental Constraints o Identify the Required NEPA Environmental Document, o Identify the Required Environmental Permits, o Utility Information o Cost Estimate o Schedule o These reports will be submitted to the County and SCDOT (if applicable) for review and comment. All comments will be addressed as applicable in a comment response matrix and revised final reports will be provided to the County. D. Plan Review o For projects on SCDOT roadways or within SCDOT ROW, the consultant shall conduct a cursory review prior to submittal to SCDOT. The review will ensure that plans satisfy SCDOT requirements and foreseeable errors are addressed. Detailed review of design and/or calculations will not be required. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 14 o For projects in the County or municipal system, the consultant will act as the County reviewer and will review for design, calculation, adherence to appropriate standards and specifications, and constructability. o If plans require submittal to County planning or other departments for review, then the Consultant will facilitate and communicate as needed. Task 4 – Utility Coordination Services • Notify utility owners of the projects and identify those utilities with facilities in the project area. • Facilitate and act as intermediary between project design team and utility representatives. • Arrange for Subsurface Utility Engineering (SUE) to establish utility locations and identify conflicts. • Obtain letters of “no-conflict” for those utilities which are not impacted. • Coordinate with utility owner(s) and designer(s) to develop relocation plans for those conflicts which cannot be eliminated. • Review all utility owners’ relocation plans to ensure that relocations proposed by one owner do not conflict with another’s relocation. • Establish prior rights of occupancy. • Obtain no- cost letters from those utility owners without prior rights or develop utility agreements with those owners who can document their prior rights. • Evaluate the feasibility of in -contract utility relocation and develop necessary agreements in coordination with the utility owner. • Monitor the progress of utility relocation and incorporate utility relocation schedules into the overall project schedule. This would include Utility Coordination Services for civil site improvements associated with the Greenbelt Initiatives. Task 5 – Construction Administration • Constructability reviews of plans and specifications prepared for projects prior to construction letting. • Attend pre-construction conferences, routine construction coordination meetings, etc. • Reviewing and maintaining records of plans, specifications, shop drawings, revisions, correspondence, warranties, etc. • Monitor each construction project and prepare monthly status reports. • Evaluating and recommending actions related to progress payments, change requests, claims, disputes, etc. • Performing project close-out activities. • Fostering and maintaining a positive public image related to construction operations by proper interaction with the public and media, maintenance of traffic, attention to safety, permit compliance, etc. This would include Construction Administration for civil site improvements Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 15 associated with the Greenbelt Initiatives. 3. Approved Projects S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane widening with multi- use paths on both sides for approximately 3.8 miles and would be coordinated with the SC 170 Widening and Access Management project ($57,000,000). US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd): 6-lane road widening for approximate 1 mile ($15,000,000). US 278 Corridor Phase 2 (Argent Blvd to I-95): 6-lane road widening for approximately 4.75 miles with two bridges (approx. 360 LF and 90 LF) ($50,000,000). SC 46/SC 170/SC 315 Intersection Improvements and Widening: assume 1 mile widening with intersection improvements at SC 46 and SC 170 to potentially combine into 1 intersection ($30,000,000). US 17/US 321 Intersection Improvement: skewed intersection in Hardeeville and may contain complicated right of way acquisition, assumes existing bridge over railroad can remain ($4,000,000). US 17 Widening (SC 315 to SC 170): 4-lane divided widening for approximately 2 miles ($24,000,000). SC 315 Widening from SC 170/SC 46 intersection to US 17: 4-lane/5-lane widening for approximately 6 miles ($41,500,000). SC 336 Intersection Improvements (Grahamville Rd to SC 336): potential realignment of SC 336 for approximately 0.3 mile and potential for complicated R/W acquisition: ($5,000,000). I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road Improvements: Upgraded interchange included with SCDOT I-95 project from MM 8 to MM 21. Project would include road improvements to US 17, Bees Creek Road, and Glover Road ($12,000,000). I-95 Exit 22 Connector (US 278 to Bees Creek Road): new road with potential new bridge over I-95, dependent upon alignment and SCDOT’s improvements for Exit 22 for approximate 3 miles: ($36,000,000). Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 16 Glover Road (Bees Creek Road (S-13) to SC 462): Dirt road and paved road improvement – assume 2 lanes with R/W purchase for future widening ($26,000,000). US 278/SC 652 (Calf Pen Bay Road) Intersection Improvement: A traditional intersection improvement on US 278 has been installed with left turn lane and right turn onto SC 652, but improvements were not incorporated on SC 652. Turn lanes with improved intersection realignment should be considered or a roundabout should be installed as this could be a key intersection for traffic calming for entrance to Ridgeland: ($2,000,000). SC 462 (SC 170 to Snake Road): 4-lane divided or 5-lane widening for approximately 3 miles and safety improvements for approximately 5 miles ($56,000,000). US 17/Mackay Point Road Intersection: Realignment of S-27-37 to eliminate skewed intersection with Mackay Point Road and may involve improved access management on US 17, dependent on coordination with SCDOT, assume 0.6-mile realignment and intersection improvement: ($5,000,000). US 321/SC 336 Intersection Improvement: skewed intersection in Tillman ($2,500,000). Reconstruction of Levy Road: ($10,000,000). Greenbelt Initiatives: $94,000,000 for financing greenbelt initiatives (including but not limited to, purchasing property for conservation, purchasing conservation easements, creating passive greenspace, creating active greenspace, protecting natural resources, protecting agricultural or heritage landscapes, and protecting scenic corridors). Notes: • Program Manager will be involved as noted with civil site improvement associated with the Greenbelt Initiatives. • Appendix 1 includes location maps Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 17 4. Initial Priorities: Jasper County officials have met, and the preliminary unofficial roadway priorities are as follows: S-442 (Argent Boulevard) (from US 278 to SC 170): 4-lane divided or 5-lane widening with multi- use paths on both sides for approximately 3.8 miles and would be coordinated with the SC 170 Widening and Access Management project ($57,000,000). US 278 Corridor Phase 1 (Beaufort County Line to Argent Blvd): 6-lane road widening for approximate 1 mile ($15,000,000). US 278 Corridor Phase 2 (Argent Blvd to I -95): 6 -lane road widening for approximately 4.75 miles with two bridges (approx. 360 LF and 90 LF) ($50,000,000). I-95 Exit 18 Interchange with US 17, Bees Creek Road, and Glover Road Improvements: Upgraded interchange included with SCDOT I-95 project from MM 8 to MM 21. Project would include road improvements to US 17, Bees Creek Road, and Glover Road ($12,000,000). Reconstruction of Levy Road: ($10,000,000). SC 336 Intersection Improvements (Grahamville Rd to SC 336): potential realignment of SC 336 for approximately 0.3 mile and potential for complicated R/W acquisition: ($5,000,000). Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 18 V. SUBMITTAL REQUIREMENTS AND FORMATTING Offerors are REQUIRED to submit all requested information and/or documentation outlined in this section of the solicitation. Any Offeror failing to do so may have their response rejected as being non-responsive and making them ineligible for contract award. Offerors shall submit their responses in a format and sequence that follows the section numbering and layout provided in this solicitation to assist the County in its evaluation of responses. Offerors shall submit written qualifications which clearly demonstrate their ability to provide quality services in an effective manner. The County desires a firm with a history of meeting or exceeding client expectations, providing effective communication between the client and the firm, a record of meeting schedules and deadlines, distinct knowledge of local sales tax programs, permitting requirements, a reputation as an effective steward of natural resources and the environment, prudent contract administration and project accounting, and a quality presentation of project deliverables. Submittals shall include the following information, and should be arranged in labeled sections as follows: QUALIFICATIONS: Section A: Personnel Technical Competence/Qualifications 1. Project Team Organizational Chart: Provide an organizational chart identifying team members who would be assigned to this contract (including sub-consultants). The organizational chart must include the name, role/position, and office location of each team member and subconsultant. A project team member may be responsible for more than one area. The offeror shall identify the following, at a minimum: • Overall Project Manager(s) • Key Financial Management Team Members • Communication/Public Engagement Team Members • Civil Engineering Team Members • Environmental Team Members • Right of Way Team Members • Construction Administration Team Members Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 19 2. Professional Resumes: Provide professional resumes of key project personnel proposed for this contract and detailed background information including: • Education; • Professional registrations and certifications, applicable to South Carolina; • Experience; • Years with firm; • Office location; • Specific role and responsibilities on past projects of this type; • Hourly billing rates (in a separate sealed envelope). 3. Firm Reserves: Description of available backup personnel, resources and their location. 4. Primary Point of Contact: Identify the Firm’s Primary Point of Contact. 5. Organization of sub-consultants and personnel: Provide the name of any firm(s) and their personnel that will be providing sub-consulting services to your firm. Also include the services they will provide, their office location, and a contact name and phone number. Section B: Background, Capabilities, Experience and Succession Planning 1. Range of Services: Provide a description of the full range of services the Firm provides. Provide the number of years in business and the location of the main office that will service the Town’s account including the location of any sub- consultants. 2. Capabilities: Discuss the firm’s unique qualifications, capabilities and methodologies that will be used for the Program Management of a Sales Tax Program. 3. Prior Experience: Provide a complete list with detailed descriptions including dollar value and time frame of the firm’s experience on similar Sales tax Programs within the past 10 years. Specify the type of work performed, the Firm’s Project Manager and personnel that worked on the referenced projects including their role. Include project photos, budget and schedule. Identify if the project was completed on time and on budget. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 20 4. Prior Experience: Provide experience, other than sales tax program experience, from South Carolina that will help show the Offerors capabilities in delivering a successful sales tax program. Include projects started no earlier than January 1, 2021. Also detail the firm’s experience working within Jasper County, if any within the same period. 5. Succession Planning: Describe how the firm will address internal succession planning so that as key personnel retire or move on from the company the County’s Program is not negatively affected. Also list any long-term municipal clients that have used the firm consistently (5 or more contracts) between January 1, 2014, and today. Include the number of contracts and a contact name phone number and email. Please note Section VII which states that if key team members identified in this RFQ are no longer available and/or not being used on this project the County reserves the right to terminate the contract. 6. Project References: Provide at least three (3) written references from Items 3, 4 and 5 above. Each reference shall provide a signed (electronic signatures are acceptable) written reference from the client contact. The reference shall include a short statement of satisfaction with the Offerors’ services as well as why, in their opinion, the project(s) were successful. The references shall include current e-mail and current phone number. The references shall come from sources outside Jasper County. 7. Workload: Provide a summary of current workload and workload projections. Present and anticipated workload of project team (please show in tabular format with each team member’s anticipated obligations depicted over the life of the project). 8. List of litigation history of the firm and all subconsultants for the past 5 years. Section D: Scope of Work Approach Discuss and provide insight into the Offerors approach to accomplish the Scope of Work. Please make sure to identify what would set the Offerors approach apart from others in the industry. 1. Project Management 2. Program & Financial Management 3. Project Planning, Scoping, and Conceptual Design 4. Utility Coordination 5. Construction Administration Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 21 Section E: Forms and Information AFFIDAVIT OF COMPLIANCE must be submitted. Section F: Costs (Submitted As a Separate Document) THIS SHALL BE SUBMITTED AS A SEPARATE DOCUMENT AND NOT INCLUDED WITH THE OTHER MATERIAL REQUESTED. Hourly rates will not be used in the evaluation of submittals but instead will form the basis for contract negotiations with the selected firm. 1. The Offeror shall submit a Billable Costs Document for their firm and all other firms listed in the RFQ. At a minimum the document shall have the following: a. An Hourly Rate Schedule for each billable title within the firm. b. Mark Up Costs for subconsultants, vendors, and suppliers, etc. c. A schedule of reimbursable costs and rates. (i.e. travel, copies, mailing, etc.) 2. Once an initial hourly rate schedule is agreed upon, rates shall remain fixed for the first year of the resulting contract. After the first year, Contractor may request one (1) annual adjustment to the hourly rates to be effective on each anniversary of the contract, but such increase shall not exceed the most recently published Consumer Price Index for All Urban Consumers (CPI-U), before seasonal adjustment as of sixty (60) days prior to the contract anniversary date. Any rate increase shall require a written contract amendment signed by both parties to become effective. If Contractor’s request for an increase is made after the applicable contract anniversary date, such increase shall not be retroactive to the anniversary date and instead shall be effective as of the date of the signed contract amendment. Mark up cost and reimbursable cost once established shall not be changed for the life of the contract. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 22 AFFIDAVIT OF COMPLIANCE To be submitted with vendor’s Proposal _________________ We Do Not take exception to the RFQ Documents/Requirements. __________________We take exception to the RFQ Documents/Requirements as follows: Specific exceptions are as follows: ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ ____________________________________________________________________________________ I have carefully examined the REQUEST FOR QUALIFICATIONS and agree to abide by all submitted pricing, delivery, terms and conditions of this Proposal unless otherwise stipulated herein. Company Name______________________________________________________________________ By__________________________________________________________________________ (Authorized Signature) ____________________________________________________________________________ (Print Name and Title) Company Address________________________________________________________________ _________________________________________________________________________________ _________________________________________________________________________________ RETURN THIS PAGE Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 23 AFFIDAVIT OF COMPLIANCE (continued) Telephone Number____________________________________________________________ Email ________________________________________________________________________ Federal Tax ID No. _____________________________________________________________ DBE Vendor (Yes/No) Minority Owned:___________________________________ Women Owned: ___________________________________ Veteran Owned:____________________________________ Date_____________________________________________________ ADDENDA Proposer acknowledges receipt of the following addendum: Addendum No. _______________ Addendum No. _______________ Addendum No. _______________ Addendum No.________________ RETURN THIS PAGE Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 24 STATEMENT OF “NO PROPOSAL” Return this page only if your company provides the products/services being requested and DECLINES to do so. We, the undersigned, have declined to respond to the above REQUEST FOR QUALIFICATIONS for Program Manager - Sales Tax Program for the following reasons: ___________ Specifications too “Narrow” , geared to one brand or manufacturer (Please explain below). ___________ Insufficient Time to Respond to REQUEST FOR QUALIFICATIONS ___________ Unable to Meet Specifications ___________ Specifications Unclear (Please explain below) ___________ Other (Please explain below) Remarks ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ ________________________________________________________________________________ Company Name _______________________________________________________ Address _______________________________________________________________ _________________________________________________________________ _________________________________________________________________ Name and Title _________________________________________________________ Date___________________________________________________________________ Signature ______________________________________________________________ Telephone Number _____________________________________________________ Email Address _________________________________________________________ Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 25 VI. CONTRACT AWARD Contract award, as well as contract continuation of the contract in subsequent fiscal periods, is subject to availability of County funds. In the event that contract negotiations with the highest rated Offeror are unsuccessful, the County reserves the right to begin contract negotiations with next highest rated Offeror. If a contract is awarded as result of this solicitation, such award shall be made to the most qualified respondent(s). In the event that contract negotiations with the most qualified respondent(s) are unsuccessful, the County reserves the right to begin contract negotiations with the next most qualified respondent(s). VII. STANDARD CONTRACT TERMS AND CONDITIONS Offeror acknowledges that a contract will need to be executed with terms and conditions acceptable to the County and the Offeror. The Offeror agrees that terms and conditions provided in this RFQ, and in their response to the RFQ either in their entirety or relevant portions thereof, shall be included and become part of any resulting contract. Please note that if the County determines that key team members identified in this RFQ are no longer available and/or not being used on this project the County reserves the right to terminate the contract. The anticipated term of the resulting contract shall be five (5) years. Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program Page | 26 APPENDIX 1 – Maps Jasper County, South Carolina RFQ #2025 - 03 Program Manager – Transportation Sales Tax Program A PPENDIX 2- Ordinance #0-2024-16 1 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC April 30, 2025 Jasper County Selection Committee Kimberly Burgess, Procurement Officer 358 Third Avenue, Suite 304 Ridgeland, SC 29936 Re: RFQ #2025-03 | Program Manager – Transportation Sales Tax Program Dear Members of the Selection Committee, At Infrastructure Consulting & Engineering, LLC (ICE), we understand what it takes to deliver a program of this size, complexity , and importance. The voter-approved Transportation Sales Tax Program represents a major investment in Jasper County’s future and requires a program manager with experience, structure, and local presence and understanding to make it successful. ICE is proud to submit our Statement of Qualifications (SOQ) to serve that role. Over the past decade, ICE has successfully managed voter-approved transportation programs across South Carolina, including Berkeley , Charleston, and Lancaster Counties. We understand how to coordinate with SCDOT, build and maintain public trust, and keep dozens of projects moving forward while aligned under one cohesive plan. We know the pitfalls to avoid, the steps to streamline, and the tools required to deliver transparent, efficient progress to your council and voters. Leading our efforts for Jasper County will be Jeff Buckalew , PE, a highly experienced program manager with over 35 years in civil engineering, including 15 years serving as the Town Engineer for Hilton Head Island. During his tenure, Jeff oversaw hundreds of infrastructure projects, managed capital improvement programs, and coordinated closely with municipal leadership, SCDOT, and the public. His background combines hands-on technical expertise with strategic program oversight — skills essential to guiding a multi-year transportation sales tax program. Jeff’s leadership ensures that Jasper County will have a program manager who understands the challenges of local government infrastructure delivery and is committed to serving as a trusted extension of County staff. With multiple road widenings, safety improvements, key intersection upgrades, and phased construction across several years, ICE understands this program demands discipline, communication, and a close working partnership with County staff. These are exactly the types of projects ICE has built its reputation on. While this may be ICE’s first proposal to serve Jasper County , we’ve already supported Construction Engineering & Inspection (CEI) services in the region and are preparing to open an office in Jasper County to support our growing work in the area. Most recently , SCDOT selected ICE to lead the Construction Management and Inspection for its largest- ever bid-build project: the I-95 widening from MM 0 to MM 8, including replacement of the bridges over the Savannah River and two interchanges. In addition, the City of Hardeeville has recently selected ICE for on-call civil engineering services. This continued trust underscores our proven ability to manage high-profile, mission-critical work and deliver results. Infrastructure Consulting & Engineering RFQ - Statement of Qualifications as Submitted on 4/30/25 EXHIBIT B-2 As Program Manager , ICE will provide Jasper County with: ` T ransparent Oversight: Establishing a tailored Program Management Plan, with real-time tracking and clear communication from kick off through completion. ` Schedule Discipline: Coordinating all phases–planning, permitting, right-of-way , design, and construction–to stay ahead of delays and keep projects moving forward. ` Budget Contr ol: Aligning cost and timelines through careful forecasting, risk management, and funding strategy support. ` Stak eholder Engagement: Supporting the County’s public outreach efforts and working closely with SCDOT, municipalities, and the community to ensure consistent coordination. ` T echnical and Regulatory Expertise: Applying SCDOT LPA standards, procurement compliance, and construction management insight to deliver each project smoothly and compliantly . ICE brings a full-service, in-house team across planning, engineering, environmental services, and construction management – ready to serve as an extension of County staff. We’ve led similar programs from start to finish and understand the day-to-day accountability , documentation, and problem-solving it takes to keep a long-term program on track. We understand the significance and trust placed in this program by Jasper County residents. ICE is prepared to honor that trust by delivering a clear , disciplined, and results-driven approach that benefits the entire community . WHY ICE? ` Local Insight, R egional Strength: With South Carolina-based leadership and an upcoming office in Jasper County , as well as offices in Bluffton and Beaufort, ICE offers both responsiveness and depth. The ICE headquarters is located in West Columbia, a short drive from SCDOT headquarters. ` Pr oven Program Management: We’ve led successful sales tax programs and understand how to manage large capital efforts across multiple agencies. ` T ransparent, Trusted Results: We know how to maintain voter confidence by ensuring accountability , clear communication, and project updates from day one. We welcome the opportunity to support Jasper County in delivering this generational investment – and would be honored to serve as your Program Manager. Please do not hesitate to contact myself or Jeff Buckalew , PE, at jeff.buckalew@ice-eng.com or 843-485-3560 with any questions. Sincerely , Mitchell Metts, PE | Principal-in-Charge mitchell.metts@ice-eng.com | 804-726-6754 Infrastructure Consulting & Engineering, LLC 2 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC2 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC 3 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS PROJECT MANAGER / MAIN POINT OF CONTACT Jeff Buckalew, PE ICE PRINCIPAL–IN–CHARGE / QA/QC Mitchell Metts, PE ICE FINANCIAL MANAGEMENT Mitchell Metts, PE ICE Josh Apsitis ICE CONSTRUCTABILITY / VALUE ENGINEERING Andy Gillis, PE ICE UTILITY COORDINATION Gus Kretschmer ICE Matthew Cox, EIT ICE CIVIL ENGINEERING / PROGRAM MANAGEMENT SUPPORT Jenny Germuth, PE ICE Leland Colvin, PE ICE LEGEND Firm Locations ICE - Infrastructure Consulting & Engineering, LLC TMS – The Merchant Strategy, Inc. (DBE) RND – RND Consultants (DBE) ★ Bluffton, SC ★ Greenville, SC ★ West Columbia, SC ★ Charleston, SC ★ N. Charleston, SC ★ Charlotte, SC ENVIRONMENTAL Barrett Stone ICE Cody Connor, PWS ICE Daniel Koon ICE RIGHT–OF–WAY Nathan Midkiff RND Renee Bergeron RND PUBLIC INVOLVEMENT / COMMUNICATION Renee Mulholland ICE Henry Phillips ICE Bree Long ICE Sharon Merchant TMS Cheryl Scott TMS Justin Scott TMS ASSISTANT PROJECT MANAGER Bryan McIlwee, PE ICE SCDOT LIAISON Leland Colvin, PE ICE PLANNING / CONCEPTUAL DESIGN RROOAADDWWAAYY Aaron Livingston, PE ICE Clarke Hinson, PE ICE Alex Nettles, PE ICE SSTTRRUUCCTTUURREE Preston Felkel, PE ICE Ray Spence, PE ICE Clark Baer, PE ICE PPAAVVEEMMEENNTT Jay Thompson, PE ICE Shilpa Girish, EIT ICE SSTTOORRMM WWAATTEERR Alexis McIlwee, EIT ICE Stuart Timmons, PE ICE Jordan Bianchi, PE ICE COST ESTIMATING / SCHEDULING Josh Apsitis ICE Trinaty Geraurd ICE CONSTRUCTION ENGINEERING & INSPECTION Marc Lemin, PE ICE Randy Carraway, PE ICE Todd Steagall, PE, DBIA ICE ORGANIZATIONAL CHART Project Team 4 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC4 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM As the Project Manager, Jeff will serve as the day-to-day lead and the main point of contact for Jasper County– responsible for overseeing the entire Jasper County Sales Tax Program and coordinating all technical, financial, and stakeholder aspects. He will guide the creation of the Program Management Plan (PMP), lead coordination with SCDOT and utility providers, and work closely with County departments, consultants, and the public to keep all projects on schedule and within scope. Jeff brings decades of relevant experience dealing with public projects and elected officials, managing multi- disciplinary infrastructure programs/projects, and will ensure that Jasper County’s priorities – transparency , timely delivery , and meaningful community input – remain front and center. AREAS OF EXPERTISE ` Pr ogram & Capital Project Management ` R oadway & Multimodal Corridor Improvements ` Stak eholders Engagement & Public Communication ` AD A Compliance, Streetscaping, & Resiliency Design ` Right-of -Way , Utility , & Environmental Coordination ` Construction Oversight & Budget Management Main Street Resiliency & Streetscape – Town of Summerville, SC: Project Manager for corridor design and construction involving road diet, utility relocation, drainage upgrades, offset pathways, lighting, and wayfinding. Leads concept development, permitting, and contractor coordination. ADA Compliance Sidewalks – Town of Bluffton, SC: Managed planning, design, permitting, and construction for pedestrian safety and ADA upgrades at 30 locations. Demonstrated his detailed approach to safety , compliance, and municipal coordination. Mitchelville Dirt Road Paving – Hilton Head Island, SC: Oversaw conversion of a dirt road to a pervious asphalt surface with an offset multi-use pathway and green infrastructure features. Led design and permitting in a residential context with environmental considerations. US 278 Multimodal Improvements – Shelter Cove Area – Hilton Head Island, SC: Managed safety upgrades for motorists, bicyclists, and pedestrians. Integrated traffic calming, pervious pathways, and signal upgrades while minimizing utility impacts and preserving heritage trees. Coligny Area Road & Drainage Improvements – Hilton Head Island, SC: Oversaw design and construction on a SCDOT–Town partnership corridor. Managed stakeholder engagement, utility coordination, permitting, ROW acquisition, and construction. RELEVANT PROJECT EXPERIENCE PROJECT MANAGER | MAIN POINT OF CONTACT Jeff Buckalew, PE Bluffton, SC | 36 years of infrastructure leadership | 2 years with ICE jeff.buckalew@ice-eng.com | 843-485-3560 PE: South Carolina #20448 BS, Civil Engineering – WVU Institute of Technology RESUMES Professional 5 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS PRINCIPAL-IN-CHARGE | QA / QC Mitchell Metts, PE West Columbia, SC | 34 years of experience | 10 years with ICE mitchell.metts@ice-eng.com | 803-726-6754 PE: South Carolina #17637 BS, Civil Engineering – Clemson University ROLE ON THE JASPER COUNTY PROGRAM As Principal-in-Charge and QA/QC, Mitchell will provide high-level program leadership and quality assurance for the Jasper County Transportation Sales Tax Program. Mitchell brings more than 30 years of experience managing large-scale transportation programs and previously served as SCDOT’s Director of Preconstruction, overseeing more than $500 million in project delivery annually . His role on this program includes overseeing quality control processes, financial oversight, and coordination with Jasper County leadership to ensure fiscal discipline and technical excellence across all projects. AREAS OF EXPERTISE ` Pr ogram Management & Strategic Oversight ` Financial Management & Cost Control ` Q A/QC Review & Design Coordination ` LP A & SCDOT Permitting Strategy ` Public Inv olvement & Agency Coordination ` Multimodal & Corridor Program Delivery Berkeley County Transportation Sales Tax Program – Berkeley County , SC: Provides financial, programmatic, and QA/QC oversight across major corridor projects, local paving, intersection upgrades, and CEI activities under a multi-phase sales tax-funded program. US 17 / Main Road Interchange & Widening – Charleston County , SC: Leads coordination between Charleston County , SCDOT, and federal agencies to deliver complex improvements including a grade-separated interchange, bridge replacement, and multi-use path development. Clements Ferry Road Widening – Phase II – Berkeley County , SC: Oversaw design reviews, permitting, funding eligibility , and interagency coordination for this 4.5-mile capacity project, including cash flow modeling and bridge construction. Bridgeway Station Pedestrian Bridge – Greenville County , SC: Served as liaison to SCDOT and project developer during the design of a new pedestrian span over I-385, coordinating design exceptions and agency approvals. Mary Ann Point Road / Main Road Safety Audit – Charleston County , SC: Directed a Road Safety Audit and stakeholder engagement process for a historically high-crash intersection; provided improvement recommendations. RELEVANT PROJECT EXPERIENCE 6 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC6 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM Leland serves as ICE’s SCDOT Liaison and senior advisor for project management and civil engineering support. With 28 years of leadership experience at SCDOT — including roles as Deputy Secretary for Engineering, Chief Engineer for Project Delivery , Director of Construction and Program Manager for the Charleston Region — Leland brings unmatched insight into SCDOT’s permitting, regulatory compliance, design criteria, and statewide transportation priorities. On this program, he will assist in navigating agency approvals, troubleshooting bottlenecks, and aligning local projects with state and federal requirements. He serves as a key resource for ensuring project delivery stays on schedule and fully compliant. AREAS OF EXPERTISE ` SCDO T Standards, Compliance & QA/ QC ` Statewide Transportation Program Oversight ` Pr ogram/Project Oversight ` Multi-Agency Pr oject Delivery ` Civil Engineering & Interstate Corridor Design ` Str ategic Planning & Stakeholder Engagement ` Utility & R OW Coordination SCDOT 10- Y ear Transportation Plan – Statewide, SC: Oversaw the implementation of SCDOT’s 10- Y ear Plan initiative associated with the passage of the 2017 Roads Bill. This included the design, environmental/permitting, right-of-way , and construction. The four components of the 10- Y ear Plan included Resurfacing, Bridges, Rural Road Safety Program, and Interstate Program. Under his leadership, the construction program at SCDOT grew from $1 Billion to $5.5 Billion meeting the initial 10-year plan targets set by the SCDOT Commission. I-77 / SC 160 Interchange – Y ork County , SC: Led design oversight for this innovative offset-direction interchange — the first of its kind in South Carolina — reducing left-turn conflicts and congestion. The project widened one mile of SC 160 to enhance access from US 21 to Pleasant Road. US 17 Widening – I-526 to SC 517 – Charleston County , SC: Oversaw design, ROW acquisition, and permitting for a 2.5-mile corridor widening. Led stakeholder engagement to address complex impacts to historical sites, churches, and businesses. I-26 / Ashley Phosphate Interchange & Widening – Charleston County , SC: Managed environmental permitting, design coordination, and ROW strategy for a 5.5-mile corridor widening and major interchange reconstruction including railroad coordination. I-520 / Palmetto Parkway Phase II – Aiken County , SC: Directed all aspects of construction for a 5.5-mile new interstate corridor with five interchanges, a terminal connection to I-20, and a separated multi-use path. RELEVANT PROJECT EXPERIENCE SCDOT LIAISON | PROJECT MANAGEMENT SUPPORT Leland Colvin, PE West Columbia, SC | 30 years of experience | 2 years with ICE leland.colvin@ice-eng.com | 803-429-3352 PE: South Carolina #20218, DBIA Professional, Certified Public Manager BS, Civil Engineering – University of South Carolina 7 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ASSISTANT PROJECT MANAGER Bryan McIlwee, PE Bluffton, SC | 24 years of experience | 1 year with ICE bryan.mcilwee@ice-eng.com | 854-529-9446 PE: South Carolina #26457 BS, Civil and Environmental Engineering – Virginia Tech ROLE ON THE JASPER COUNTY PROGRAM As Assistant Project Manager, Bryan will support the day-to-day coordination, technical oversight, and stakeholder engagement across all phases of the Transportation Sales Tax Program. Working closely with Project Manager Jeff, Bryan will help manage the schedule, integrate public feedback into early project planning, and oversee coordination among subconsultants, design teams, and permitting agencies. With a strong background in both municipal engineering and capital project delivery , Bryan offers deep insight into the unique needs of South Carolina’s coastal communities — particularly when it comes to streetscaping, stormwater infrastructure, and context-sensitive roadway improvements. AREAS OF EXPERTISE ` Civil Engineering & Design ` Pr oject Management for Local Government ` Coastal Dr ainage & Resiliency ` Multi-use P athways & Streetscapes ` Stormw ater Permitting (SCDHEC, SCDOT, County) ` Hy drology & Hyraulic Modeling (XP_ SWMM) Dr . Mellichamp Drive Streetscape & Drainage Improvements – Bluffton, SC: Led design, permitting, and construction oversight for a revitalized commercial corridor featuring pervious parking, stormwater upgrades, pedestrian enhancements, lighting, and landscaping. May River Road Streetscape Improvements – Bluffton, SC: Managed full delivery of this gateway corridor improvement. The project added pervious parking, new sidewalks, drainage infrastructure, and enhanced streetscaping along a high-visibility route. Bridge Street Streetscape Improvements – Bluffton, SC: Oversaw design of streetscape improvements to a major collector, including parking, pedestrian access, storm drainage, and aesthetic elements. Myrtle & Hickory Lane Road & Drainage Improvements – Hilton Head Island, SC: Managed conversion of private beach roads to public infrastructure with new pavement sections, storm drainage systems, and ROW coordination. Gardner Drive Pathway & Drainage – Hilton Head Island, SC: Designed a multi-use pathway with stormwater improvements, permitting coordination, and a timber bridge connector for school and community access. Stormwater Inventory & Modeling – Hilton Head Island, SC: Managed hydrologic and hydraulic modeling and GIS-based inventory efforts from 2008 to 2016 as part of the Town’s stormwater management program. Lafayette Major Drainageway Plan Study – Lafayette, CO: As Project Manager, led a flood hazard and stormwater resiliency study across a 5.65-square-mile area to develop alternatives and enhance safety , water quality , and community aesthetics. RELEVANT PROJECT EXPERIENCE 8 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC8 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM Alexis supports the Jasper County Transportation Sales Tax Program as a Water Resource Engineer focused on stormwater management and local project coordination. With nearly a decade of multidisciplinary experience in stormwater modeling, drainage infrastructure design, urban planning, and municipal project delivery , she offers strong technical and planning support during the scoping, pre-design, and permitting stages. Alexis’s experience with government agencies–including project management roles at the Town of Hilton Head Island– enhances the team’s ability to respond to complex site constraints and regulatory expectations. AREAS OF EXPERTISE ` Stormw ater Modeling & Drainainge Design ` Urban & Spatial Planning ` Civil Site Design & Infrastructure Upgrades ` GIS / Data Management ` Stormw ater Permitting & FEMA Coordination ` Stak eholder Engagement & Multi- Agency Review Stormwater Inventory & SWMM Modeling – Hilton Head Island, SC: Led hydrologic and hydraulic modeling for over 1,300 acres in the Palmetto Hall/ Mitchelville area. Managed project from procurement through implementation, incorporating tidal influences, hurricane drainage strategies, and system performance evaluations. Cordillo Courts Drainage Improvements – Hilton Head Island, SC: Analyzed and designed drainage system upgrades for a flood-prone condominium community , including detention basin regrading and new conveyance infrastructure. Cobia Court & Wildhorse Court Drainage Upgrades – Hilton Head Island, SC: Redesigned stormwater systems to resolve localized flooding, improve outfall culvert capacity , and restore channel flow capacity through residential corridors. Belleview Avenue & Clarkson Street Drainage – Greenwood Village, CO: Designed storm sewer rehabilitation and in-situ lining for urban infrastructure. Coordinated construction staging, street closures, and utility adjustments. Goldsmith Gulch Drainage Stabilization – Greenwood Village, CO: Managed floodplain channel stabilization involving boulder edging and erosion control at a utility conflict site, in partnership with the Mile High Floodplain District. 16th Street Pedestrian Mall Drainage Improvements – Denver , CO: Proposed urban drainage improvements for high-traffic corridor using 2D modeling. Designed water quality treatment devices integrated with pedestrian facilities. RELEVANT PROJECT EXPERIENCE WATER RESOURCE ENGINEER / PROJECT MANAGEMENT SUPPORT Alexis McIlwee, EIT Bluffton, SC | 9 years of experience | 1 year with ICE alexis.mcilwee@ice-eng.com | 854-529-9434 EIT: South Carolina #22318 BS, Environmental Engineering – Michigan Technological University 9 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS TRANSPORTATION ENGINEER / PROJECT MANAGEMENT SUPPORT Jenny Germuth, PE Charleston, SC | 12 years of experience | 5 years with ICE jenny .germuth@ice-eng.com | 843-576-3946 PE: South Carolina #32444 BS, Civil Engineering – Clemson University ROLE ON THE JASPER COUNTY PROGRAM Jenny will support the Jasper County Transportation Sales Tax Program as a Transportation Engineer, bringing deep experience in roadway design, project coordination, and civil site development. As a proven team leader across sales tax-funded programs, Jenny will assist in scope development, utility coordination, design review , stakeholder outreach, and documentation. Her proactive project management style and deep technical knowledge will help ensure consistency , cost-efficiency , and smooth transitions from planning through permitting. AREAS OF EXPERTISE ` R oadway & Civil Site Design ` T ransportation Sales Tax Program Support ` Utility Coor dination & Railroad Interface ` P ermitting (SCDOT, NEPA, Local Agencies) ` Construction Documentation & QA/QC ` Multidisciplinary Project Management Berkeley County Sales Tax Program Management – Berkeley County , SC: Managed projects within the county’s sales tax program including Henry E. Brown Jr. Boulevard Phase 2, Foster Creek at Tanner Ford, and various Dirt- to-Pave projects. Oversaw financial tracking, stakeholder engagement, utility and railroad coordination, and standardized design processes for consistent program delivery . Henry Brown Boulevard Widening Phase 2 – Berkeley County , SC: Led preliminary design, permitting, ROW plans, and multi-agency coordination for this corridor expansion project. Designed multi-use paths, medians, and a signalized intersection near an active rail line. Main Road Widening Segment C (Bohicket Road) – Charleston County , SC: Provided planning, alternative analysis, and preliminary design for this NEPA-aligned roadway widening, preparing to serve as Lead Roadway Engineer in later phases. Carolina Crossroads Phase 1 – Richland County , SC: Coordinated railroad approvals, encroachment permits, and utility adjustments for this high-profile interstate interchange and widening project. US 17 at Main Road Interchange & Widening – Charleston County , SC: Supports EIS process, ROW design, and engineering plans for a $195M improvement project that includes flood mitigation, shared-use path design, and SCDOT coordination. England Road Dirt-to-Pave – Berkeley County , SC: Oversaw design, permitting, and construction documentation for rural roadway paving under the sales tax program. RELEVANT PROJECT EXPERIENCE 10 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC10 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM As CEI Oversight, Marc will oversee day-to-day construction administration and inspection operations throughout the Jasper County Transportation Sales Tax Program. He will manage on-site field teams, coordinate with contractors and County departments, lead pre-construction meetings, and maintain QA/QC documentation. Marc’s responsibilities also include overseeing job-site materials testing, tracking contractor compliance with technical specifications, and ensuring adherence to safety and environmental requirements. With over 30 years of field experience, Marc brings a seasoned, boots-on-the-ground perspective to ensure construction runs smoothly , transparently , and in alignment with the County’s expectations for quality and accountability . AREAS OF EXPERTISE ` CEI Pr ogram Management & Field Oversight ` Utility Coor dination & Field Engineering ` SCDO T Inspection Standards & Materials Testing ` R oadway , Intersection, & Drainage Improvements ` Submittal Ov ersight, RFIs, & Construction Documentation ` On-site Dispute Resolution & Stakeholder Coordination SCDOT CE&I On-Call Services – District 6, SC: CEI Manager overseeing inspection scheduling, issue resolution, and documentation across multiple projects in Jasper, Beaufort, and surrounding counties. SC 170 Widening – Beaufort County , SC: Project Manager for $15M widening effort funded through local sales tax. Led CEI efforts, managed contractor activities, and coordinated environmental protections for wetland crossings. I-95 Business Loop Streetscape – Colleton County , SC: Served as CEI Project Manager for 4.45 miles of corridor improvements including resurfacing, sidewalk installation, and drainage work. Collaborated closely with County staff during construction. Boundary Street Redevelopment – Beaufort County , SC: Project Principal for this $18M downtown revitalization project. Oversaw constructability reviews, utility relocation coordination, and transition to undergrounding of utilities. Orangeburg Road Roundabout – Dorchester County , SC: Project Manager for intersection conversion and safety improvements. Led submittal and RFI review , field inspections, and stakeholder coordination. RELEVANT PROJECT EXPERIENCE CEI OVERSIGHT – FIELD MANAGEMENT, DAIL Y CONSTRUCTION ADMINISTRATION Marc Lemin, PE Charleston, SC | 30 years of experience | 18 years with ICE marc.lemin@ice-eng.com | 843-576-6672 PE: South Carolina #27012 BS, Civil Engineering – Virginia Tech 11 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS CONSTRUCTION ADMINISTRATION ENGINEER Randy Carraway, PE Greenville, SC | 36 years of experience | 12 years with ICE randy .carraway@ice-eng.com | 803-227-4056 PE: South Carolina #19586 BS, Civil Engineering – North Carolina State University ROLE ON THE JASPER COUNTY PROGRAM As a senior member of ICE’s Construction Administration team, Randy brings over three decades of experience in bridge, roadway , and large-scale infrastructure construction. He will support construction oversight, quality assurance, and field engineering across the County’s sales tax program. With a career that spans design, CEI, and materials management, Randy offers rare insight into constructability , plan compliance, and contractor coordination on complex, multi-phase projects. Randy will serve as an embedded resource during preconstruction reviews and be on-site to support resolution of design conflicts, submittals, and construction documentation—ensuring County expectations are met from groundbreaking through final acceptance. AREAS OF EXPERTISE ` Construction Engineering & Inspection (CEI) ` Interstate & Bridge Program Delivery ` SCDO T & FWHA Construction Compliance ` Design-Build Program Coordination ` Utility R elocation, Plan Reviews & Site Audits ` Materials T esting & Documentation Standards I-85 over Rocky Creek Bridge Replacement – Greenville, SC: Project Manager for multi-stage bridge replacement involving box culvert removal, new elevated lanes, and coordination with FHWA, SCDOT, and inspectors. I-85/I-385 Gateway Interchange Improvements – Greenville, SC: Deputy Resident Engineer and Materials Manager on this $231M design-build interchange project. Oversaw all sampling, material certifications, SCDOT coordination, and compliance tracking across ten bridge structures and multiple roadways. Palmetto Parkway Phase II – North Augusta, SC: Project Manager for this 6.5-mile interstate extension completing the I-520 loop. Led a 16-person CEI team managing 16 bridges, 7 culverts, and over 6 million CY of earthwork. SC 35 – 12th Street Extension – Cayce, SC: Construction Engineer on a major bridge and roadway project. Responsibilities included daily documentation, utility coordination, compliance audits, and contractor pay estimates. MoDOT Safe and Sound Bridge Replacement Program – Missouri (Statewide): Construction Engineer for one of the largest bridge replacement programs in the U.S. Oversaw documentation and coordination for over 370 bridge projects with a 45-day average build time. RELEVANT PROJECT EXPERIENCE 12 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC12 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM Serving as CEI Program Manager, Todd will lead strategic oversight and program-wide coordination across all active construction packages. He will guide compliance with SCDOT standards, federal regulations, and QA/ QC procedures while supporting field staff with escalation needs and providing expert input on permitting or materials-related decisions. Todd will also oversee construction documentation, pay application verification, and change order negotiation to ensure fair pricing and responsible cost control. With a statewide background managing SCDOT’s $3B construction program, Todd brings the experience and systems needed to ensure the County’s CEI efforts are cohesive, consistent, and fully compliant from the field to final acceptance. AREAS OF EXPERTISE ` CEI Pr ogram Management & Inspection Oversight ` Statewide Construction Program Administration ` Q A/QC Compliance & Materials Documentation ` SCDO T/FHWA Specifications & Change Management ` Stak eholder Coordination & Dispute Resolution Mossy Oaks Drainage Project – City of Beaufort: Construction Manager on this multi-jurisdictional watershed improvement. Leads CEI, pay application review , and construction documentation. Town of Hilton Head Island IDC: Provides full CEI oversight across several capital improvement projects. Gadsden Loop Sidewalk Project – Colleton County , SC: Managed CEI services for a CDBG-funded pedestrian safety project. Oversaw utility relocation, contractor coordination, and pay applications. Port Access Road – Charleston, SC: Directed CEI and construction coordination for this $220M design-build project connecting I-26 to the SC Ports Authority terminal. I-26 Widening & Bridge Replacements – Lexington/Calhoun Counties, SC: Oversaw delivery of 20 miles of widening and bridge replacements. Handled QA/QC, contractor coordination, and conflict resolution. Arthur Ravenel Jr . Bridge (Cooper River): Served as Quality Management Engineer, overseeing inspections and documentation on one of South Carolina’s largest bridge projects. RELEVANT PROJECT EXPERIENCE CEI PROGRAM MANAGEMENT–COMPLIANCE STRATEGY, CONSTRUCTION CONTROLS Todd Steagall, PE West Columbia, SC | 35 years of experience | 6 years with ICE todd.steagall@ice-eng.com | 803-227-4056 PE: South Carolina #17651 BS, Civil Engineering – Clemson University 13 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ENVIRONMENTAL MANAGER Barrett Stone West Columbia, SC | 27 years of experience | 9 years with ICE barrett.stone@ice-eng.com | 803-746-7147 MS, Environmental Health – University of South Carolina BS, Wildlife Biology – Clemson University ROLE ON THE JASPER COUNTY PROGRAM As Environmental Manager, Barrett will lead all environmental tasks for the program–ensuring compliance with NEPA, Section 404/401 permitting, and environmental documentation required to support federally and locally funded infrastructure projects. Barrett will coordinate early scoping, environmental screening, stakeholder engagement, and agency coordination to keep projects on track, especially those impacting wetlands, protected species habitats, and sensitive coastal zones. With nearly three decades of experience across South Carolina and the Southeast, Barrett is uniquely positioned to help Jasper County balance growth and conservation. His oversight will reduce risk, streamline permitting, and ensure that Jasper County's Greenbelt and infrastructure priorities are planned with resilience and responsibility . AREAS OF EXPERTISE ` NEP A Documentation & Environmental Compliance ` Section 404/401 Permitting & Wetland Delineations ` Envir onmental Justice & Public Involvement ` Thr eatened & Endangered Species Coordination ` Construction Phase Environmental Oversight ` DO T & FAA Environmental Assessments I-26 Widening, MM 172–187 – Dorchester & Berkeley Counties, SC (SCDOT): Serves as Environmental Manager for NEPA compliance and Section 404 permitting. Oversees wetland delineations, document prep, and agency coordination on this major interstate widening and bridge replacement effort. Carolina Crossroads Phases 1 & 2 – Richland & Lexington Counties, SC (SCDOT): Leads NEPA reevaluation, permitting strategy , and construction- phase compliance support for this $1.7B interchange modernization. Coordinates all environmental documentation and supports public outreach efforts. Pathways Project – Beaufort County , SC: Environmental Manager overseeing documentation and permitting for more than 16 miles of pedestrian pathways. Supported project visioning aligned with the County’s long-term mobility and environmental goals. Fred Nash Boulevard Widening & Extension – Horry County , SC: Environmental Manager providing NEPA documentation and 404/401 permitting to support widening and access to a proposed economic development corridor. I-85 Widening & Bridge Replacements (GDOT) – Jackson County , GA: Led all environmental tasks on a 6.5-mile corridor improvement including major bridge construction. Responsible for NEPA documentation and agency engagement. US 17 & Main Road Interchange EIS – Charleston County , SC: Environmental Permitting Lead responsible for wetland and critical area permitting for major interchange and flood-mitigation upgrades. Supported public engagement and alignment alternatives. RELEVANT PROJECT EXPERIENCE 14 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC14 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM As Utility Coordination Lead, Gus brings more than three decades of experience managing complex utility coordination on major transportation programs across South Carolina and the Southeast. He will lead all utility coordination activities for the Jasper County Transportation Sales Tax Program, including conflict analysis, utility relocation strategies, in-contract adjustments, and Subsurface Utility Engineering (SUE) oversight. Gus has successfully led utility coordination on over 100 projects—including large-scale design-build and sales-tax funded initiatives — and is known for preventing costly delays through early engagement and persistent follow-up. He will ensure all utility work is seamlessly integrated into the program schedule and budget. AREAS OF EXPERTISE ` Utility Coor dination & Adjustment Planning ` Subsurf ace Utility Engineering (SUE) ` Design-Build & In-Contract Utility Strategies ` Utility Conflict Matrix & Cost Estimating ` R ailroad Coordination (CSX, NS, short lines) ` Utility Agr eements & MOAs (ACT36 / BILL 401) I-26 Widening (MM 85–101) – Richland, Lexington & Newberry Counties, SC: Utility Relocation Manager overseeing four utility coordinators and 18 utility owners. Managed utility strategy , conflict resolution, and in-contract relocation agreements for water and sewer. ($465M project) Carolina Crossroads Phases 1 & 2 – Richland & Lexington Counties, SC: Utility Coordinator and Manager for both phases of this $1.7B interchange modernization. Led SUE planning, stakeholder coordination, and railroad utility crossing solutions with CSX and NS. Project Brooklyn – BMW Spartanburg – Greenville County , SC: Utility Coordinator for new two-lane bridge and road system serving full-size truck traffic across I-85. Managed relocations under both SCDOT and BMW specifications. US 21 over Harbor River Bridge Replacement – Beaufort County , SC: Led utility planning and final relocation coordination for this 3,353-foot-long fixed- span bridge over a tidal channel. I-95 Widening & Pavement Rehab (MM 13–20) – Lumberton, NC: Utility Coordinator for resilience-focused interstate upgrade. Developed preliminary and final utility coordination plan to accommodate interchange reconstruction and flood resilience measures. SCDOT Utility Coordination On-Call Contract – Statewide, SC: Served as statewide Utility Coordination Manager for multiple safety and widening projects, including in Lexington, Horry , and Florence Counties. Oversaw agreements, relocation plans, and agency coordination. RELEVANT PROJECT EXPERIENCE UTILITY COORDINATION LEAD Gus Kretschmer Charlotte, NC | 34 years of experience | 12 years with ICE gus.kretschmer@ice-eng.com | 704-247-1754 Legal Aspects of Easements – IRWA Certification BS, Parks, Recreation and Business – Appalachian State University 15 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS ROLE ON THE JASPER COUNTY PROGRAM Josh will support the Jasper County program by overseeing financial controls and schedule performance tracking. His expertise in cost forecasting, CPM schedule development, and construction phasing will enhance Jasper County’s ability to monitor budgets, track milestones, and avoid risks across dozens of active projects. With a decade of experience managing high-profile, multimillion-dollar infrastructure efforts, Josh ensures accountability , transparency , and timely delivery through integrated reporting and hands-on coordination with County staff, contractors, and stakeholders. AREAS OF EXPERTISE ` Pr ogram Budgeting & Financial Controls ` CPM Schedule Management ` Claims & Risk Analysis ` Construction Cost Forecasting ` Pr ogress Tracking & Earned Value Reporting ` Construction Phasing & Field Coordination Berkeley County Transportation Sales Tax Program – US 176 Widening – Berkeley County , SC: Managed monthly schedule reviews and risk assessments for the 5.6-mile widening of US 176. Tracked progress against 30K+ LF of utility relocations. Provided delay mitigation strategies and financial forecasting. Carolina Crossroads Phases 1 & 2 – Richland & Lexington Counties, SC: Oversaw baseline schedule development, shop drawing review (MSE walls, girders), and contractor coordination on $1.7B multi-phase interstate improvement project. Led plan reviews and CPM schedule oversight. Glenn McConnell Parkway Widening (CE&I Services) – Charleston, SC: Tracked contractor progress, verified submittals, and managed CPM schedule for 2-mile widening with sidewalks, multi-use paths, and intersection upgrades. Supported pay estimate accuracy and milestone validation. Henry Brown Boulevard Widening Phase 2 – Berkeley County , SC: Led schedule reviews for corridor expansion with medians, multi-use paths, and major intersection improvements. Aligned progress tracking with construction phasing and field operations. Main Road Corridor Segment A – Charleston County , SC: Assisted with timeline validation and stakeholder coordination for the Stono River crossing, shared-use path, and roundabout installation. Conducted site visits and discrepancy analysis. East/West Container Y ard Expansion – Inland Port Greer – Greer , SC: Managed phasing plan review and subconsultant compliance on $30M terminal storage upgrade. Kept Port Authority appraised of milestone performance. Assisted with submittal tracking and cost updates. RELEVANT PROJECT EXPERIENCE FINANCIAL MANAGEMENT SUPPORT / PROJECT CONTROLS Josh Apsitis West Columbia, SC | 12 years of experience | 3 years with ICE josh.apsitis@ice-eng.com | 803-386-8952 BS, Civil and Environmental Engineering – The Citadel 16 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC16 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS RESERVES Firm ROADWAY ENGINEER Aaron Livingston, PE West Columbia, SC | 22 years of experience | 12 years with ICE aaron.livingston@ice-eng.com | 803-227-4064 PE: South Carolina #26136 MBA, Entrepreneurship – Clemson University BS, Civil Engineering – Clemson University STRUCTURAL ENGINEER J. Preston Felkel, PE West Columbia, SC | 27 years of experience | 9 years with ICE preston.felkel@ice-eng.com | 803-227-4065 PE: South Carolina #26987 MS, Structural Engineering – University of South Carolina BS, Civil Engineering – University of South Carolina PAVEMENT ENGINEER Jay Thompson, PE West Columbia, SC | 24 years of experience | 2 years with ICE jay .thompson@ice-eng.com | 803-881-2711 PE: South Carolina #27041 MS, Civil Engineering – Clemson University BS, Civil Engineering – Clemson University VALUE ENGINEERING Andy Gillis, PE West Columbia, SC | 28 years of experience | 10 years with ICE andy .gillis@ice-eng.com | 803-227-4051 PE: South Carolina #23517 BS, Civil Engineering – University of South Carolina 17 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS PUBLIC INVOL VEMENT / COMMUNICATION Renee Mulholland N. Charleston, SC | 21 years of experience | 6 years with ICE renee.mulholland@ice-eng.com | 843-576-6683 MS, Earth and Environmental Resource Management – University of South Carolina BS, Marine Science – University of South Carolina Firm Reserves and Backup Personnel Resources ICE has the staffing capacity and systems in place to support Jasper County’s Transportation Sales Tax Program at every stage. Our team structure includes backup personnel across key disciplines to ensure that if staffing adjustments are needed, we can transition coverage quickly and without disruption. We maintain a strong roster of engineers, inspectors, environmental planners, and program management staff who are familiar with our processes and ready to step in when needed. With experienced personnel based across South Carolina and built-in staffing flexibility , ICE is committed to providing steady , consistent service throughout the life of the program. Jasper County will have the benefit of not only the core project team but also additional qualified staff who can support the program if workload shifts, schedules accelerate, or other needs arise. Primary Point-of-Contact: Jeff Buckalew , PE | Project Manager jeff.buckalew@ice-eng.com 843-485-3530 ROW AGENT / ASSISTANT PROJECT MANAGER Renee Bergeron Renee supports ROW acquisition, relocation, and engineering review efforts. In addition to leading relocation logistics and document preparation, she assists with design plan evaluations, schedule tracking, and public outreach. She brings key expertise in Environmental Justice (EJ) community coordination and multi-agency collaboration. 18 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC18 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS PUBLIC INVOL VEMENT & STRATEGIC COMMUNICATIONS The Merchant Strategy, Inc. (TMS) West Palm Beach, FL | Fort Lauderdale, FL | Little River, SC 20+ years of experience info@themerchantstrategy .com | www .themerchantstrategy .com Certifications: DBE/ACDBE (FL & SC DOTs) MWBE (Charleston, SC), SWBE (Palm Beach County), CBE (Broward County) ROLE ON THE JASPER COUNTY PROGRAM TMS will serve as Jasper County’s Public Involvement Lead, guiding all stakeholder and community outreach for the Transportation Sales Tax Program. Their team will lead the development of a comprehensive Public Involvement Plan (PIP), manage a dedicated project website and social media presence, coordinate stakeholder workshops, produce visual and print outreach materials, and operate a 24/7 hotline. Their long- standing experience with SCDOT, municipal governments, and public-private partnerships makes them uniquely equipped to deliver proactive, strategic communications and foster transparency throughout the life of the program. OPERATIONS AND PROJECT MANAGER Cheryl Scott Cheryl, originally from Detroit, leads the execution of TMS’s outreach plans, managing daily communications, stakeholder logistics, hotline operations, and community-facing materials. With over 20 years of administrative and management experience, she also supports project scheduling, contract administration, and internal coordination. Cheryl plays a central role in translating complex engineering information into clear public messaging and is instrumental in office-wide decision-making and project continuity . MARKETING AND PUBLIC INVOL VEMENT SPECIALIST Justin Gonzales, MBA Justin supports digital communications, social media management, public meeting coordination, and the visual design of outreach materials. Leveraging his legal and marketing background, he crafts cohesive, professional messaging across platforms, ensuring strong stakeholder engagement and brand alignment. He also brings experience in executing integrated marketing campaigns, managing multi-channel strategies, and analyzing ROI to maximize impact and budget efficiency . SUBCONSUL TANTS & PERSONNEL Organization of 19 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS PRESIDENT & PUBLIC INVOL VEMENT DIRECTOR PRESIDENT & PUBLIC INVOL VEMENT DIRECTOR Sharon J. Merchant 30+ years of experience in Public & Government Relations | 19+ years in Public Involvement sharon@themerchantstrategy .com BS, International Affairs – Florida State University As a four-term Florida State Representative and founder of TMS, Sharon provides high-level leadership, strategic oversight, and quality assurance on all outreach activities. She has led public involvement for some of the region’s most sensitive and high-visibility infrastructure projects–delivering consensus–building strategies, stakeholder coordination, and transparent communication on behalf of cities, counties, and state agencies. AREAS OF EXPERTISE ` Public Inv olvement Planning (PIP & CAP) ` Stak eholder & Government Liaison ` Q A/QC of Outreach Materials ` Media Str ategy & Crisis Response ` Constituent Communication Management ` Public Meeting Facilitation & Oversight RELEVANT PUBLIC INVOLVEMENT EXPERIENCE KCI Technologies – City of Delray Beach ADA Sidewalk Project Relevance: County/municipal sidewalk improvement initiative, similar in scope to pedestrian enhancements often included in transportation programs. Stantec – FDOT D4 SR-91/I-95 at Hypoluxo Road Diverging Diamond Interchange Relevance: Highway/interchange project, coordination with state DOT and stakeholders, includes QA/QC on major transportation initiatives. Stanley Consultants – I-95/SR-9 PD&E Study (Martin & St. Lucie Counties) Relevance: Public meetings, collateral development, and regional public outreach for an interstate corridor — aligns with SCDOT-level infrastructure efforts. WGI – FDOT/Palm Beach County Off-System Bridge Replacements Relevance: Public outreach for local bridges — a transportation-focused, county-coordinated infrastructure improvement effort. Erdman Anthony – FDOT Projects in West Palm Beach Relevance: Coordinated with TPO, SFWMD, FEC, and engineering teams; multi-agency and stakeholder engagement reflects complex program dynamics. City of West Palm Beach – Washington Road Utility and Stormwater Improvements Relevance: Utility and drainage-focused infrastructure improvements with city coordination — parallels county-level utility and roadway projects. 20 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC20 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section A | PERSONNEL TECHNICAL COMPETENCE & QUALIFICATIONS RIGHT-OF-WAY AQUISITION AND RELOCATION SERVICES RND Consultants Charleston, SC 8+ years of experience info@rndconsultants.com Certifications: DBE/SBE ROLE ON THE JASPER COUNTY PROGRAM RND Consultants will serve as the Program’s Right-of-Way (ROW) and Relocation Services Lead, providing full-scale acquisition, relocation, and coordination services across all project phases. Their team brings deep, hands-on experience navigating South Carolina’s ROW requirements, managing complex property negotiations, and supporting SCDOT acquisition compliance. With expertise in relocation services, eminent domain coordination, title and appraisal oversight, and community engagement in Environmental Justice (EJ) areas, RND will ensure a seamless and community-minded ROW process for Jasper County . PROJECT MANAGER / ROW AGENT Nathan Midkiff Charleston, SC | 14 years of experience | SCDOT & Municipal ROW Expertise Memberships and Certifications: National Transit Institue-FTA Real Estate Requirements | IRWA-RW/RAC Candidate | International Right-of-Way Association ROLE ON THE JASPER COUNTY PROGRAM Nathan leads RND’s Right-of-Way team for Jasper County , bringing deep expertise in acquisition planning, property negotiation, and Uniform Act compliance. He has managed relocations and acquisitions across South Carolina and Massachusetts and is experienced with full/partial fee acquisitions, easements, condemnation support, and relocation claims. AREAS OF EXPERTISE ` Eminent Domain & Relocation Coordination ` R eal Estate Negotiation & Acquisition Strategy ` R OW Plan Review & Property Impact Minimization SCDOT I-526 Lowcountry Corridor WEST – Charleston, SC: Managed 95 acquisitions and 50 relocations; coordinated with title, appraisal, and legal teams; handled relocation claims and community engagement SCDOT I-73 Segment A6M – Marion County , SC: Led acquisition of 11 tracts; developed preliminary ROW estimates and acquisition documents. SCDOT Georgetown Roundabout – Murrells Inlet, SC: Managed acquisition of 9 parcels; completed appraisals, title reviews, and negotiations. RELEVANT PROJECT EXPERIENCE ICE’s Capabilities & Services ` Ar chitecture ` A viation Engineering ` Bridge/Structur al Design ` Construction Management / CE&I ` Design-Build Engineering ` Envir onmental Services ` F oundation Testing ` Geotechnical Engineering ` Gr ant Writing ` Hy drology / Hydraulic Design ` Intelligent T ransportation Systems (ITS) ` Materials T esting Services (Lab) ` P avement Engineering ` P ort Engineering / Civil Site Design ` Public R elations ` R ailroad Services ` R oadway Design ` T raffic Engineering ` Utility Coor dination ` Surv eying SCDOT US 21 Harbor River Bridge – Design-Build 21 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC At ICE, our mission is simple: to deliver infrastructure solutions that serve communities today and stand the test of time. Founded in 2005–originally as Coleman–Snow Consultants–we’ve grown into a multidisciplinary engineering firm known across the Southeast for our ability to lead complex projects and programs, anticipate challenges, and build long-term trust with our clients. With over 580 professionals, including 160 licensed engineers and specialists, ICE brings the leadership, technical depth, and real-world experience needed to guide multi-year capital improvement efforts from early planning through final construction. From our 23 offices across eight states, we support transportation programs of all sizes– and we’re proud to bring that strength home to South Carolina. ICE will soon be opening an office in Jasper County , further bolstering our local presence to strengthen our ability to support the County’s Transportation Sales Tax Program with on-the-ground responsiveness and ongoing collaboration. What sets ICE apart is our ability to integrate services under one roof– offering a single-source solution for program management. Our Team includes specialists in: ` Pr ogram and financial management ` T ransportation project planning and prioritization ` Envir onmental permitting and NEPA documentation ` Utility coor dination and conflict resolution ` Land surv eying and right-of-way verification ` Construction management and inspection services ` Public inv olvement and strategic communications & CAPABILITIES Range of Services At ICE, we don’t just manage projects—we manage progress. From early stakeholder coordination to construction phasing and financial tracking, we understand what it takes to lead high-profile, sales tax-funded programs that demand transparency , efficiency , and public trust. For Jasper County , that means a team that is not only highly capable but also highly accessible—bringing the structure, insight, and hands-on leadership needed to deliver this generational investment with accountability to the community . 22 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC22 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING Managing a program of this scale requires more than technical capability–it demands the ability to navigate regulatory requirements, collaborate with state agencies, and solve problems before they become delays. That’s where ICE brings exceptional value to Jasper County . We do not just know SCDOT–we have been a part of it. Several members of ICE’s leadership team previously held high-ranking positions within the South Carolina Department of Transportation, including Deputy Secretary of Engineering, Director of Construction, Director of Preconstruction, and Regional Production Engineer. This firsthand experience and strong relationships with current staff gives our team an insider’s understanding of SCDOT’s processes, permitting pathways, quality standards, and decision-making protocols–allowing us to move faster, with fewer obstacles. Our in-house SCDOT liaisons understand how to coordinate effectively at both the district and headquarters level. From permit applications and LPA documentation to design exceptions and construction coordination, ICE knows how to engage the right people, at the right time, with the right information. The result: fewer bottlenecks, clearer expectations, and accelerated progress. ICE has led and contributed to dozens of SCDOT projects across the state, including: ` SC27 7 Flyover Ramp Bridge Replacement ` I-7 7 Widening and Bridge Replacements ` SC 901 Bridge o ver Rocky Creek ` Butler Road Improvements ` I- 85 Rocky Creek Bridge Replacement ` I- 26 Widening (Richland & Lexington Counties) ` I- 95/I-26 Interchange (Orangeburg & Dorchester Counties) By preempting delays, streamlining submittals, and aligning with SCDOT standards from the start, ICE ensures that local projects meet state expectations without compromise. For Jasper County , that means a trusted partner who can keep the program moving– on schedule, in compliance, and with confidence. Strategic Partnership with SCDOT: Accelerating delivery through experience ICE has consistently delivered above-standard performance on the I-26 contract. The Team has met all deliverable deadlines and produced high-quality work. Project Manager Metts and Design Manager Kicklighter have shown excellent responsiveness, and the Public Information Meeting was well-planned and effectively executed. The Team has done a strong job utilizing key staff to meet project demands, and PM Metts continues to lead at a high level. We look forward to continued success on this project. SC277 Flyover Ramp Bridge Replacement Our Process. YOUR PROGRESS. What to Expect from ICE: Clear Planning from Day One ` T ailored project scoping and risk-based planning ` Community-inf ormed solutions that reflect Jasper County’s priorities ` T ransparent, milestone-driven program roadmap Strategic Oversight that Delivers ` Full-scope pr ogram coordination, from pre-design through construction ` Pr oactive issue tracking, schedule alignment, and quality control ` Financial stew ardship with real-time tracking and clear reporting Public Trust Built Through Partnership ` Engaging communications and community outreach ` Seamless collabor ation with County staff and stakeholders ` Experienced leadership that listens, adapts, and delivers results 23 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING Over the past decade, ICE has delivered full-service program management for multi-million-dollar transportation sales tax initiatives across South Carolina–demonstrating not only our ability to lead, but to do so with fiscal accountability , stakeholder transparency , and a relentless focus on timely , on- budget delivery . These programs have included planning, scheduling, financial oversight, right-of-way and utility coordination, and hands-on management of capital infrastructure improvements. We’ve supported Berkeley , Lancaster, and Charleston counties through every stage of their sales tax programs—earning a reputation as a trusted, long- term ally to public agencies invested in infrastructure improvement. Whether it’s collaborating with county finance departments to shape project-level budgets, coordinating early utility relocations to avoid delays, or tracking real-time progress across dozens of active job sites, ICE brings the structure, staffing, and systems required to manage complex transportation programs with clarity and control. Since 2011, ICE has played a central role in delivering over a dozen capital projects involving design, permitting, CEI, LPA compliance, and agency coordination—demonstrating our strength as a hands- on leader in program execution and delivery . Combined with our deep ties to SCDOT, this real-world experience positions us to guide Jasper County’s program from vision to reality . Why This Matters to Jasper County Our past experience gives us direct insight into what makes programs succeed–or stall. We’ve learned how to build early momentum, navigate funding cycles, and maintain the public’s trust through visible progress, transparency , and proactive communication. ICE will bring this experience to Jasper County–not only to manage projects, but to help the County manage a legacy investment and long-term community impact. EXPERIENCE Prior Strategic Partnership with SCDOT: Accelerating delivery through experience 24 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC24 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING SALES TAX PROGRAM Berkeley County Client: Berkeley County Y ears Active: 2015–Present Program Value: $587 ,000,000 Completed On-Time/Budget: Ye s Program Overview: Since 2015, ICE has served as the Program Manager for Berkeley County’s voter-approved Transportation Sales Tax Program, leading the planning, management, and implementation of a wide range of capital improvement projects. These include major road widenings, intersection upgrades, resurfacing efforts, and dirt-to-pave conversions that enhance safety , reduce congestion, and support regional growth. ICE provides full life-cycle support–from financial planning and consultant procurement to construction oversight and community outreach. We manage budgets and schedules, perform QA/QC reviews, coordinate utilities and right-of-way , assist with permitting, and ensure SCDOT LPA compliance. Our team supports Berkeley County across all phases of project delivery and facilitate transparent, efficient progress across dozens of active projects. Key Services Provided: Program and Financial Management; Scope and Fee Negotiation and Consultant Procurement; QA/ QC Reviews and Constructability Oversight; ROW and Utility Coordination; Permitting and Environmental Compliance; Public Involvement and FOIA Support; CEI and Construction Oversight; Bid Phase Support and Value Engineering Key Personnel Involved: Mitchell Metts, PE; Marc Lemin, PE; Todd Steagall, PE; Jenny Germuth, PE; Clark Baer, PE; Gus Kretschmer; Preston Felkel, PE; Aaron Livingston, PE Support Team: Planners, Utility Coordinators, and document control specialists Highlighted Projects Managed: ` Clements F erry Road Widening, Phase II ` Henry Br own Boulevard Widening, Phase II ` US 176 Widening & Interchange Improvements ` Daniel Island R oundabout ` R oyle Road Signal Plan ` F arm Hill Circle & Zion Road (CEI) ` F oster Creek at Tanner Ford Boulevard ` I- 26 Widening at Nexion Parkway (CEI) ` US 52 at US 176 Inter change ` Fiv e Dirt-to-Pave Roads ` F our Major Intersection Improvements ` Six Major Capacity Projects ` 59 P aving Projects ` Local Str eet Resurfacing Projects Daniel Island Roundabout Henry Brown Road Widening Due in part to ICE’s oversight during the design phase, the actual bid for the Project came in at $1.76 Million, substantially under the pre-bid budget of $2 Million. In addition, ICE’s effective management during construction led to the Project being completed ahead of schedule and a savings of $338,234. Frank Carson, Berkeley County Engineer 25 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING Client: Charleston County , SC Contract Duration: 2013–Present Program Value: $847 ,000,000 Completed On-Time/Budget: Ye s Program Overview: ICE is a trusted partner on Charleston County’s $847M RoadWise program, providing design, CEI, and program support services across a variety of capital transportation projects. From roadway widenings and interchanges to sidewalks and drainage improvements, ICE’s expertise has contributed to the successful delivery of critical infrastructure across the County . Key Services Provided: Engineering; Surveying; Permitting; Geotechnical; Administrative Services; QA/QC; CEI; Field Coordination Key Personnel Involved: Mitchell Metts, PE; Marc Lemin, PE; Todd Steagall, PE; Aaron Livingston, PE; Preston Felkel, PE; Gus Kretschmer Highlighted Projects Awarded: ` Johnny Dodds Boulev ard Widening (Design-Build) ` US 17 / Main R oad Interchange & Widening ` P aving Arman Road & Gifton Avenue ` US 17 at P arkers Ferry Road Turn Lane ` P almetto Commerce at Ladson Road Intersection ` East Ashley A venue at 2nd Street East ` I- 26 at Ashley Phosphate Road ` F ort Johnson Road Sidewalks, Phases 3 & 4 ` Osceola A venue Drainage Improvements ` Mabeline R oad Turn Lane Extension ` P almetto Commerce Parkway , Phase II (Design-Build) US 17 / Main Road Interchange & Widening US 17 / Main Road Public Involvement Johnny Dodds Boulevard Widening Palmetto Commerce Parkway, Phase II HALF-CENT SALES TAX PROGRAM Charleston County Craig Farm Road Quality Drive Craig Farm Road Construction 14+ years SUPPORTING LANCASTER COUNTY 26 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC26 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING Highlighted Projects Managed: ` Pr ograms 1-7 (2015 - 2020): 44 roads paved, totaling 27+ miles ` Pr ogram 8 (2021 - Present): CEI and construction oversight on four roads (2.55 miles) ` Pr ogram 9 (2024): Currently underway with the same core ICE team Lancaster County Client: Lancaster County , SC Contract Duration: Ongoing since 2015 Program Value: $68,092,276 Completed On-Time/Budget: Ye s Program Overview: ICE has supported Lancaster County across nine sales tax-funded paving programs, delivering over 30 miles of resurfacing and roadway upgrades on time and within budget. Acting as a full-service partner, ICE provides end-to-end management—from pavement design and drainage evaluations to CEI services and procurement support. ICE’s continuity across multiple program phases ensures consistency , cost control, and efficient delivery . The same experienced team has led Programs 1 through 9, maintaining strong institutional knowledge and trusted working relationships with County staff and contractors. Key Services Provided: Program Coordination and Project Management; Pavement Design and Cost Estimating; Field Surveying and Drainage Reviews; Construction Administration and CEI Services; Consultant Procurement and Bid Support Personnel Involved: Marc Lemin, PE; Gus Kretschmer PENNY SALES TAX PROGRAM Shiloh Unity Road SURROUNDING AREA Prior Experience: Jasper County & Timeframe: January 2021 - Present Highlighted Projects: ` SCDO T I-95 (MM 0 – 8) Jasper County: ICE was selected as the Construction Management and Inspection provider for SCDOT’s largest bid-build project to date. ICE will lead the inspection and coordination efforts along this vital interstate corridor. This project runs directly through Jasper County and involves ongoing collaboration with SCDOT, FHWA, and local stakeholders. ICE has a strong growing presence in Jasper County and has played a key role in several projects in nearby Beaufort and Colleton counties. We have a proven track record at delivering quality SCDOT-funded and LPA- compliant projects throughout South Carolina, particularly in rural and coastal communities. Our Team is highly experienced in navigating utility conflicts, right-of-way challenges, and interagency coordination. ` I- 95 Business Loop Streetscape – Colleton County: This project consisted of 4.45 miles of improvements along I-95 Business Loop that included resurfacing the existing roadway , the addition of raised concrete medians with underdrain, drainage improvements, and sidewalk installation. ICE was responsible for providing project/ construction management and CEI services. ` P athways Project – Beaufort County: ICE is serving as the prime consultant for the design and delivery of approximately 16.4 miles of 10’ pathways across Districts 1, 2, 3, 4, 5, and 9. These projects aim to create safer walking routes to schools and improve connectivity to residential areas. ICE is leading project management, surveying, permitting, pathway and drainage design, utility coordination, and public engagement throughout the program. ` SCDO T On-Call CEI – District 6: ICE is providing CEI services for roadway and bridge projects across the district, including assignments within Jasper County . Our Team supports SCDOT through field inspections, contractor oversight, and quality control to ensure safe, efficient project delivery . 27 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING 28 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC28 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING At ICE, we recognize that a program of this size and duration demands not only the right team–but also continuity and a proactive succession strategy . Our structured approach ensures uninterrupted service to Jasper County , regardless of staffing transitions over the life of the program. To lead this effort, ICE has assembled a strong leadership team: Jeff Buckalew , Bryan McIlwee, and Mitchell Metts. Each bring extensive experience managing complex projects, and together they offer deep leadership capacity and continuity . Whether serving as Project Manager or stepping in to support evolving program needs, this leadership bench ensures that Jasper County receives consistent, high-level and long-term stability . Recognized as the #1 civil design firm in South Carolina by ENR (2024) and recently ranked #2 engineering firm for employee satisfaction by Engineering.com, our commitment to both project success and team stability sets us apart. We maintain low staff turnover and strong redundancy in experience and expertise across key positions. From day one, each of our key roles will have a designated deputy or support staff member who is already embedded in the program, understands the workflows, and is prepared to step up if needed. This built-in redundancy ensures that institutional knowledge, relationships, and momentum are preserved–no matter what. In addition: ` Our internal knowledge transfer processes include shared project management tools, centralized reporting systems, and team- wide access to schedules, budgets, and communications. ` ICE activ ely invests in developing rising leaders, ensuring there is a robust talent pipeline in every discipline–from project management and CEI to financial and public involvement. ` F or every key person, ICE leadership identifies at least one secondary contact to the County , who can respond quickly and maintain operations if the primary staff member is temporarily or permanently unavailable. Should transitions occur during the program, we will coordinate closely with the County to ensure a seamless hand-off, including overlap between outgoing and incoming staff, updated contact information, and a clear delineation of duties. Our goal is simple: to provide stability , consistency , and reliability over the full life of Jasper County’s Transportation Sales Tax Program. We will ensure there is no hiccup or drop off in the progress of program due to any change in staff on the ICE team. More than a slogan–it is a promise. As Program Manager, ICE will act as an extension of Jasper County staff, committed to your core goals; economic growth, safer roads, and lasting infrastructure. Example: In Berkeley County , ICE managed over 70 transportation projects under the One Cent Sales Tax Program, including major road widenings, intersection improvements, and paving initiatives. This comprehensive management approach led to enhanced infrastructure and improved quality of life for residents. Your Key Project Values, OUR PRIORITY Y our Project Team Jeff, Alexis, and Bryan at our Bluffton office PLANNING Succession Client Name Address Client Representative Telephone Number Lancaster County , SC 101 N. Main Street, P .O. Box 1809 Lancaster, SC 29721 Jeff Catoe Lancaster County Public Works Director jcatoe@ lancastercountysc.gov 803-416-9692 Charleston County , SC 4045 Bridge View Drive, Suite B240 North Charleston, SC 29405 Stephen Thigpen, PE Charleston County Deputy Administrator sthigpen@ charlestoncounty .org 843-202-6146 Berkeley County , SC 1003 Highway 52 Moncks Corner, SC 29461 Daniel Thrower Berkeley County Chief Infrastructure Officer danny .thrower@ berkeleycountysc.gov 843-719-4131 REFERENCES Project 29 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING 30 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC30 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING 31 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING Steven L. Thigpen, P. E. DCA - Public Servicers April 18, 2025 Kimberly Burgess, Procurement Officer ..,,, ,._ 'm m· �m ... m m m CHARLESTON ■ COUNTY ■ SOUTH CAROLINA Director, Administrative Services Division Jasper County 358 Third Avenue, Suite 304 P.O. Box 1149 Ridgeland, SC 29936 843.202 6146 ,tht!,(llcn@cha rlc,roncuu llt)' .c >I")! Lonnie Hamilton III Public Services Building 4045 Bridge View Drive, Suite B240 orth Charleston, SC 29405 RE: Reference for Infrastructure Consulting & Engineering, LLC for Sales Tax Program Management Services Dear Ms. Burgess: Infrastructure Consulting & Engineering (ICE), formerly known as Coleman-Snow Consultants, has served Charleston County with professionalism and technical expertise for more than 17 years. ICE was selected as the Project Manager and Engineer of Record for several major transportation initiatives funded by the Charleston County Transportation Sales Tax Program, including two large Design-Build projects: the Johnny Dodds Boulevard Improvements (2008-2013) and Palmetto Commerce Parkway Phase II (2009-2011). ICE's responsibilities on these projects included contractor quality control, roadway and drainage design, utility coordination, and surveying. In 2013, Charleston County selected ICE again to provide comprehensive engineering services for Sales Tax Program projects. ICE provided surveying, permitting, geotechnical investigations, and complete engineering and administrative support needed to deliver construction-ready plans. Projects awarded through this contract include: • Paving of Arman Road and Gifton A venue • Turn Lane Improvements at US 17 and Parkers Ferry Road • Palmetto Commerce at Ladson Road Intersection Improvements • East Ashley A venue at 2nd Street East • I-26 at Ashley Phosphate Road • Fort Johnson Road Sidewalks, Phases 3 & 4 • Osceola A venue Drainage Improvements • Mabeline Road Turn Lane Extension Most notably, ICE currently serves as both the lead design firm and the Construction Engineering & Inspection (CE&I) firm for the $195 million US 17 /Main Road Interchange & Widening project. In this role, ICE is responsible for: 32 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC32 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING WORKLOAD 33 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING Key Personnel KEY TEAM MEMBER CURRENT ACTIVE PROJECTS END YEAR % AVAIL. Jeff Buckalew, PE Project Manager / Main Point of Contact Long Cove Club Paving 2025 75% Town of Summerville Main Street Resiliency Project 2026 Palmetto Dunes Bridge Rehab 2026 Town of HHI Various On-Call Projects 2026 Mitchell Metts, PE Principal-in-Charge / QA/QC Berkeley County Sales Tax Program SCDOT I-26 Corridor Improvements (MM 172 to 187) Charleston County Main Road Corridor (Seg. A) 2027 2026 2026 65% Bryan McIlwee, PE Assistant Project Manager Town of Summerville Main Street Resiliency Project 2026 80% Town of HHI Various On-Call Projects 2026 Town of Bluffton Pedestrian Improvements 2025 Long Cove Club Various Projects 2025 Palmetto Dunes Various Projects 2026 Alexis McIlwee, EIT Water Resource Engineer Palmetto Dunes POA Port Tack Drainage Design & Construction 2025 80% Island Club Entrance Modifications 2025 Town of Summerville Main Street Resiliency Project 2025 I-285 / I-20 Westside Interchange 2026 Barrett Stone Environmental Manager SCDOT I-26 Corridor Improvements (MM 172 to 187) 2025 70% SCDOT I-26 / I-95 Interchange Improvements 2026 GDOT SR 316 Bundle 1 2025 Marc Lemin, PE CEI Oversight – Field Management SCPA NBIF Site Development Beaufort County CEI Projects 2025 2026 80% Jenny Germuth, PE Transportation Engineer Various Berkeley County School District Projects 2026 2026 2028 70% Berkeley County On Call Dorchester County On Call Todd Steagall, PE CEI Program Manager CCR Phase 1 – QC Inspection & Testing 2025 70% Gus Kretschmer Utility Coordination Lead NCDOT U-3467 Rea Road NCDOT NC 540 Widening 2025 2026 70% Randy Carraway, PE Construction Administration Engineer SCDOT – Bridge Package 29 - QC 2025 70% ICE has been involved in the following litigation in the last five years. These cases will not affect our performance or ability to serve as Program Manager for Jasper County . 34 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC34 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING HISTORY Litigation 35 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section B | BACKGROUND, CAPABILITIES, EXPERIENCE & SUCCESSION PLANNING To meet the transportation needs, the County identified priority projects encompassing highways, roads, bridges, and intersections. These include major capacity expansions such as widening S-442 (Argent Boulevard) into a 4-or-5-lane arterial to relieve congestion, widening segments of US 278 for regional traffic, and widening SC 315, US 17 , SC 462 to improve north-south mobility . Interchange improvements at I-95 (Exits 18 and 22) are planned to enhance connections between the interstate and local roads – supporting economic development and hurricane evacuation. Numerous intersection upgrades (e.g., US 17/321 in Hardeeville, US 321/336 in Tillman) will straighten alignments and improve safety . Even rural infrastructure is prioritized, with projects like Glover Road improvements (upgrading dirt and paved roads) and Levy Road reconstruction to modern standards. We understand that roads were prioritized based on objective factors – pavement condition, safety concerns, traffic volume, congestion levels, and the potential to leverage state/federal matching funds. This ensures that the program tackles the worst problems first and maximizes outside funding opportunities. ICE will help advance these priorities, continually evaluating needs and opportunities to keep the program moving toward completion and aligned with Jasper County’s goals. 36 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC36 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH The 2024 Transportation Sales Tax Program Born from these community needs, the Program was approved by voters, signaling a clear mandate for County action. ICE fully understands the context and significance of this program. The 1% sales tax will fund a multi-year capital improvement program – unprecedented in Jasper County’s history –dedicating roughly 80% of revenues to transportation projects and 20% to Greenbelt projects, as outlined in the referendum ordinance. For up to 15 years of collections, the program is estimated to generate $470 million for the identified needs. Jasper County’s leadership wisely structured the program to balance infrastructure upgrades with land conservation, ensuring sustainable growth and quality of life. UNDERSTANDING Program Jasper County stands at the crossroads of rapid growth and change. On a weekday morning, traffic on US 278 and other main arteries often back up for miles as commuters, freight trucks, and tourists all share the road. Longtime rural two-lane roads now serve booming communities, leading to congestion and safety concerns that have “plagued the county” in recent years. At the same time, Jasper County’s rivers, wetlands, and green spaces – from Savannah River down to Broad River – face increasing pressure from development. Residents have voiced a clear desire for better infrastructure and preservation of natural resources: Anyone that has driven through Jasper County from 7 a.m. to 9 a.m. knows that we need help with our road system. We want clean drinking water, and that means protecting land along the Savannah River. Top Priorities ICE’S FIRST STEPS AS PROGRAM MANAGER 1. Integrate with County Staff and Establish Local Public Agency Status We will embed key ICE personnel alongside Jasper County staff from day one. One of our immediate actions will be assisting the County in obtaining LPA certification with SCDOT, enabling the County to let and oversee projects involving federal and state funding. This unlocks autonomy and streamlines coordination for key corridor projects like US 278. 2. Develop a Clear Program Management Plan (PMP) We will create a comprehensive PMP that outlines how every part of the program will run–from decision- making to risk control, budgeting, reporting, and public communication. This document ensured everyone is working from the same playbook and avoids confusion or delays down the road. 3. Build the Master Program Schedule A Master Schedule will map out project phasing across the full life of the program. It will track dependencies, cash flow alignment, design timelines, and construction sequencing–ensuring transparency and minimizing internal conflicts. This will be updated regularly as projects progress. 4. Identify and Launch “Quick Win” Projects To build early momentum and public trust, ICE will work with the County to prioritize smaller, high- visibility projects (e.g., resurfacing or safety improvements) that can be delivered fast. These quick wins demonstrate progress and encourage continued support from voters and stakeholders. 5. Coordinate Public Involvement and Outreach Working closely with The Merchant Strategy , our team members will spearhead communications and engagement with residents, merchants, and stakeholders. Early outreach ensures public concerns and feedback are heard, incorporated into planning, and help avoid opposition or surprises later. 6. Perform Environmental and Utility Conflict Screenings Our environmental and utility teams will begin GIS-based screenings across the project list to flag red flags early (wetlands, historic sites, underground conflicts). Addressing these early avoids costly redesigns or permit delays later in the program. 7. Review and Refine Project Scopes and Budgets ICE will evaluate each project’s initial scope, assumptions, and cost estimates to confirm accuracy and identify areas for refinement or bundling. This step ensures realistic schedules and budgets and forms the basis for procurement sequencing and bond alignment. 37 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH 38 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC38 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Public trust and accountability are central to the program’s success. The sales tax represents a major investment by taxpayers, and the public expects visible improvements and careful fund management. Jasper County has instituted strong oversight measures, including a Transportation Sales Tax Advisory Committee that will regularly review project progress and recommend project prioritization and annual independent spending audits as required by the ordinance. ICE fully supports these measures. We will provide clear, data-driven updates for elected councils and the public through regular progress reports, website postings, and annual reports that document accomplishments in clear, accessible formats. We will track every dollar and project milestone to ensure full transparency . Additionally , ICE will help Jasper County leverage the voter-approved bonding authority — up to $150 million in general obligation bonds — to expedite priority projects while maintaining fiscal responsibility . In summary , ICE’s understanding of Jasper County’s Transportation Sales Tax Program is comprehensive. Our management approach will be tailored to achieve these goals, with flexibility to adapt to evolving needs — whether pursuing new federal grants or adjusting for market conditions. ICE’s philosophy is rooted in proactive planning, stakeholder engagement, and practical solutions. Jasper County can be confident that our Team “gets it” and will keep the County’s best interests at the forefront of every decision. We have the local knowledge, insight, and forward-looking vision needed to shepherd this program to success. AND SUPPORT Greenbelt Coordination While the Greenbelt program will be managed by a separate firm, ICE understands that certain elements– such as the design and construction of civil infrastructure–may intersect with our responsibilities as Program Manager. These could include building access roads to passive parks, installing docks or trails, or supporting drainage and site access for preserved lands. ICE will support the County’s Greenbelt efforts by managing any civil-related scopes that fall within the Transportation Sales Tax Program, including: ` Coor dinating with the County and the Greenbelt consultant to scope and schedule civil works tied to conservation or recreational use ` Ensuring civil impr ovements comply with permitting, ADA, and environmental standards ` Managing the design and construction of r oadways, access points, or low-impact amenities serving broader community and conservation goals We recognize this program is about more than adding lanes or preserving land—it’s about delivering improvements that enhance daily life, build public trust, spur economic opportunity, and preserve the Lowcountry character of Jasper County. 39 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH MANAGEMENT Project As Program Manager, ICE will establish a strong project management framework from day one. Our first task will be to integrate with Jasper County’s Team and act as an extension of County staff. We will have our Project Manager and key staff work hand-in-hand with County staff and officials. We will first assist the County in obtaining Local Public Agency (LPA) certification with SCDOT . This is a crucial step to enable Jasper County to self-manage projects that involve state and federal funding. ICE has several former SCDOT management on staff and is well-versed in SCDOT’s LPA requirements. Our Team includes professionals who have developed and implemented LPA procedures. We will guide the County through the application, training, and compliance process so that the County gains the authority to let and oversee projects on state highways using local funds. Achieving LPA status early will save time and money later by streamlining coordination with SCDOT on projects like the US 278 corridor and I-95 interchanges. Next, ICE will prepare a detailed and comprehensive Program Management Plan (PMP) that will serve as the playbook for the entire sales tax program. This document will outline governance, communication protocols, public information, reporting and, risk management strategies, quality control measures, and every aspect of program execution. For example, the PMP will establish protocols for a clear hierarchy of decision-making (so minor design adjustments do not require full Council approval, for instance) and will define how changes in project scope or schedule are evaluated and approved. Cost estimates will be reviewed, vetted, and updated annually , as this is key to keeping pace with market trends and avoiding budgets being busted seemingly without reason. It will also include a public involvement plan (developed in concert with the County PIO and stakeholders) to ensure citizens stay informed about progress, public meetings, and road work schedules. Program Management Foundation 40 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC40 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Schedule and phasing management is a critical element ICE brings to Program and Project Management. We will develop and maintain a Master Program Schedule that sequences all projects over the 15-year period, considering logical priorities, dependencies, and funding flows. Our scheduling experts will use software tools, such as Microsoft Project, to integrate individual critical path method project schedules into a program-wide Gantt chart that clearly shows and tracks critical tasks and deadlines as well as design and construction timelines for each road project and the timeline for Greenbelt acquisitions and improvements. This schedule will be a living document, updated continuously and reviewed in bi-weekly coordination meetings. Early in the program, ICE will help Jasper County prioritize “quick win” projects – those that can be initiated and completed in the first few years (such as intersection improvements or urgent safety fixes) – to show immediate results to the public. Concurrently , we will launch the design of larger projects (such as the Argent Blvd widening and other major widening projects) so that those can enter construction by 3-5 years with the aid of bond financing, as needed. We will recommend staggering projects to avoid overloading local traffic detours or the construction labor market at any one time. Our approach to phasing will ensure that each year of the program yields tangible improvements, while maintaining manageable workloads. Master Scheduling and Quick Wins ICE’s Project Managers will convene weekly update meetings with design consultants and contractors once projects are active and monthly status meetings with County leadership and the Advisory Committee to review high-level progress or at frequencies as directed by the County . A cornerstone of our project management approach is risk management. ICE will lead a cost-risk analysis workshop for each major project at the conceptual stage. In these workshops, we will bring together subject-matter experts (design engineers, environmental scientists, utility coordinators, etc.) to brainstorm potential risks – e.g., unforeseen wetlands increasing permitting time on a road widening, or utility relocations adding costs and delays – and assign likelihood and cost impacts to each. This process, which ICE has successfully used on large highway projects, results in a “risk-adjusted” cost and schedule that can help condition expectations and avoid unpleasant surprises. By quantifying risks early , w e can develop contingencies and mitigation plans (such as scheduling certain activities in dry season to minimize environmental delay or bundling utility relocations into the construction contract to maintain control). This proactive approach sets ICE apart – rather than reacting to problems, we anticipate and neutralize them to keep the program on track. Risk Management and Early Mitigation US 278 Corridor – Phase 1 41 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Stakeholder Coordination ICE's project management team will emphasize proactive stakeholder coordination and communication through the program. We recognize that successful delivery involves many parties including: ` County Departments ` SCDO T ` Municipalities (Har deeville & Ridgeland) ` Utility Companies ` Pr operty Owners ` R egulatory Agencies ` The Gener al Public To maintain alignment across all groups, out Project Management Team will establish dedicated coordination channels tailored to each stakeholder's needs. SCDOT Coordination: We will hold quarterly meetings with SCDOT to review the status of projects on state route. These meetings will ensure that project plans meet SCDOT standards and that required approvals are secured on schedule–preventing administrative delays and streamline delivery . Municipal Coordination (Hardeeville and Ridgeland): We will meet regularly with the City of Hardeeville to coordinate on projects within or near city limits—such as the US 17/321 intersection upgrades and Argent Boulevard improvements. These discussions will incorporate local input on design elements and ensure traffic management plans minimize impacts on daily life and commerce. Similarly , ICE will coordinate closely with Ridgeland leadership on projects that affect their jurisdiction to ensure local needs and concerns are addressed early in the design and construction process. Emergency Responders and School District Coordination: ICE will assist County staff in maintaining direct contact with emergency responders and school officials during project planning and construction phasing. We will work to ensure that emergency routes are preserved, detours are clearly communicated, and school bus operations remain safe and efficient throughout construction activities. Berkeley County Sales Tax Ribbon Cutting Ceremony 42 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC42 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH ICE’s public involvement efforts will be led by TMS, a trusted communications partner on our Team. Their work will ensure that Jasper County citizens remain informed, engaged, and supportive throughout the life of the Transportation Sales Tax Program. Public Outreach and Communication Public Meetings and Community Engagement TMS will organize public information meetings at key project milestones, such as during concept planning phases and prior to the start of major construction activities. These sessions will provide opportunities for residents to offer feedback, ask questions, and stay involved throughout program delivery . Program Website and Public Portal We will develop and manage a dedicated Program Website and Public Portal to serve as the central information hub for all project activities. This will feature: ` Pr oject Updates and Announcements ` Inter active Maps ` Construction Timelines ` Financial Summaries ` Public Comment and F eedback Tools Social Media and Targeted Outreach To complement the website, TMS will implement regular social media updates and targeted outreach materials designed to keep a broad audience informed. These communications will help tell the story of the program clearly and compellingly , reinforcing transparency and building public trust over the course of the multi-year effort. ICE's Integration Role ICE's program management team will fully integrate public outreach activities into the broader management strategy , ensuring that transparency , open communication, and accountability are maintained throughout every phase of the Transportation Sales Tax Program. 43 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH FINANCIAL MANAGEMENT Program and Big-Picture Financial and Schedule Oversight Managing a $470 million program requires meticulous financial and schedule oversight, along with a big-picture perspective on how all the moving parts fit together. ICE’s approach will ensure that every dollar of the Transportation Sales Tax is maximized and accounted f o r. We will handle the program’s finances with the same care as we would our own—exercising fiscal discipline, transparency , and strategic planning to deliver projects on time and within budget. Budget Setup and Financial Reporting We will work with the County Finance Department to set up budget accounts for each project and for overall program administration. As invoices come in – from design consultants, contractors, land purchases, etc. – they will be logged against the respective project budgets in real- time. Our financial analysts will generate monthly financial reports that summarizing: ` Expenditur es to date ` P ercent of budget used ` R emaining funds per projects These reports will be tailored for different audiences: ` Detailed versions for County Finance staff ` High-level summaries f or the Advisory Committee and the public, ensuring financial transparency at every level Setup and Forecasting Real-Time Tracking Cost Controls Audits and Reporting Create project-specific budget accounts, forecast revenue, and align funds with project phasing. Log invoices against live budgets and generate monthly reports showing expenditures, % used, and remaining balance. Establish cost targets, manage consultant pricing, and bundle projects strategically to maintain efficiency and value. Support annual audits and prepare public-facing financial summaries with clear charts and plain-language insights. 44 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC44 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Sales T ax Revenue Management and Cash Flow Planning ICE is very familiar with the revenue mechanics of local option sales taxes. Jasper County’s tax will have a defined lifespan of no more than 15 years and will collect up to $470 million (or cease when that amount is reached). We will work with the County to develop conservative revenue projections each year, likely in consultation with the State Department of Revenue data. Knowing the expected cash flow , we will help plan how to phase projects accordingly . Strong cost management is essential throughout design and construction. Some years will see spikes in construction spending, whereas sales tax revenues accrue steadily . ICE will develop and periodically update cost-loaded schedules for each project to determine anticipated cash needs. ICE will use this as the basis to assist the County in determining when it may be appropriate to bond up to the approved $150 million to save on escalating construction costs. For example, we anticipate the County being able to pay-as-you-go during the first two years of the program. Getting design contracts in place and the design phase underway and finalized will be a relatively minor funding need when compared to the construction phase, which is the most expensive and last phase of the project delivery . We will develop a 15-year cash flow model that plots out sources and uses of funds, ensuring that the program never faces a funding shortfall. Cost Control Strategies Cost control is another essential aspect of our financial management. ICE will enforce strong cost management practices from design through construction. In design, we will set cost targets for each project (based on the referendum estimates and our refined cost-risk analyses) and challenge design consultants to stay within those targets. We will review design decisions for cost efficiency – for instance, evaluating whether a 5-lane section can transition to 4 lanes sooner to save costs without impacting traffic or using retaining walls strategically to reduce right-of-way acquisition. During construction procurement, ICE will assist the County in packaging projects in a way that achieves economics of scale and attracts competitive bids (perhaps bundling smaller projects together or separating specialty work into different contracts to get the best pricing). We will provide independent engineer’s estimates for each construction project being bid and may need to negotiate to keep contractor prices reasonable. Rigorous Change Order Management Every change will be evaluated for necessity , and we will seek cost recovery or value engineering options to offset any added costs. By having a full program view , we can sometimes offset cost increases on one project with savings on another. For example, if Project A comes in under budget, we can reallocate those funds to Project B if needed, with County approval. We will recommend developing and maintaining a program contingency fund, if feasible (essentially a reserve from within the $470M) to handle unforeseen costs, and we will only dip into it with proper justification and after exhausting other avenues. "More Value per Penny: Through aggressive pursuit of grants and smart project phasing, ICE will stretch Jasper County's Penny Sales Tax further – delivering more improvements without more cost" 45 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Grant and Additional Funding Support A distinguishing feature of ICE’s approach is our commitment and strategy to identify additional funding sources to stretch leverage and maximize the County’s sales tax dollars. The referendum’s success positions Jasper County as an excellent candidate for matching grants – many state and federal grants look for local commitment, which the sales tax demonstrates. ICE will actively seek grants (like USDOT’s RAISE or INFRA grants, South Carolina State Infrastructure Bank opportunities, or FEMA resilience grants for road improvements in flood-prone areas). We will work with the County to prepare compelling grant applications. We will use our knowledge of the projects to emphasize regional significance (for US 278, for example) or safety benefits (for rural road improvements). If successful, these grants could fund portions of projects, freeing up local funds to cover more scope or additional projects. ICE is very familiar with federal requirements and will guide the County accordingly , should a federal grant be obtained. Financial Compliance and Reporting Identifying other funding sources will extend the program’s impact far beyond what the sales tax alone could achieve. On the administrative side, ICE will ensure strict compliance with financial regulations and reporting requirements unique to other funding sources. We will assist the County during the annual independent audits by keeping immaculate records and documentation for every transaction. Our Team will assist the County by providing any needed project documentation so that auditors (and the public) can easily verify that funds were spent in accordance with the referendum’s intent. We will also help draft the annual report to the County Council and the public, which the Advisory Committee can present, documenting progress and expenditures in an accessible format. ICE’s experience preparing similar reports for other county programs means we know how to communicate the program’s financial health clearly , using charts, tables, and plain language summaries. Summary ICE's Program and Financial Management approach is characterized by comprehensive oversight, strategic financial planning, and unwavering public transparency . Jasper County’s citizens will be able to see that their money is managed by professionals who care about value and accountability . Success for us means delivering all promised projects within the $470 million—or even doing more—by smart management and leveraging funds. ICE’s track record of effective program controls and financial stewardship will be a tremendous asset to Jasper County . Mitchell Metts, Principal-in-Charge 46 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC46 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Project Scoping Reports That Define Scope, Needs, and Expectations For each transportation project in the program, ICE will develop a detailed Project Scoping Report (or Project Planning Report). This report will be a foundational document that compiles all key information and decisions about the project at the concept stage. Per the RFQ expectations, our Conceptual Design Team will include in these reports: ` Dr aft Purpose and Need Statement (identifying why the project is needed, e.g. relieve congestion on SC 170, or improve safety at a skewed intersection); ` A detailed Project Description ; ` Pr oposed Design Criteria (design speed, typical section width, design standards); ` A sk etch-level Conceptual Design layout (plan view of road improvements, preliminary alignment or widening footprint and typical sections); ` The Pr oject Extents (location, area, and length); ` An Envir onmental Constraints overview (identifying wetlands, historic properties, endangered species habitats or other concerns in the area); ` An initial determination of the required NEPA level (e.g. Categorical Exclusion vs. Environmental Assessment) and any likely environmental permits needed ; ` A Utility Coor dination overview (noting which utilities are present and potential conflicts); ` P otential Easement and Right of Way needs, based on concept plans; ` A preliminary Cost Estimate (itemized to the extent possible, including contingencies informed by the risk analysis); ` A projected critical-path Schedule for design and construction The r eport will serve as a one-stop reference for County officials, the Advisory Committee, and other stakeholders. ICE will seek County approval before development, incorporate review comments, and finalize the report for public release. AND CONCEPTUAL DESIGN Project Planning, Scoping, Laying the Groundwork with Purpose and Clarity For successful design and construction, good planning is essential. ICE’s approach to Project Planning, Scoping, and Conceptual Design will set each project up for success by clearly identifying objectives and ensuring that we utilize the first principles of thinking: “Begin with the end in mind.” In this early phase, our Team will work closely with Jasper County , SCDOT, municipalities and other stakeholders to define each project’s objectives, explore alternatives, and resolve the final scope, budget, and schedule – all while considering environmental and community factors from the outset. 47 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Holistic, Multidisciplinary Scoping What sets ICE apart in this stage is our experienced and holistic approach to project scoping. This will be key to avoiding confusion and misunderstandings, and enable us to set and meet, or exceed expectations. We do not just consider the engineering – we also consider community input, environmental stewardship and realistic permitting timeframes, right-of-way impacts and acquisitions, and constructability from the beginning. Our Team will organize field visits and charrettes for each major project, bringing together engineers, environmental scientists, and utility experts to walk the project area (physically or via maps and Streetview) and identify issues early. For example, on the SC 46/170/315 intersection project, our scoping Team will coordinate with both SCDOT and local engineers and planners because this project could significantly alter traffic patterns at a key junction between Jasper and Beaufort counties. We will evaluate different conceptual layouts with County staff (perhaps a roundabout vs. a signalized realignment) and weigh them against the project goals of capacity and safety . For widening projects like US 17 or SC 315, early decisions like which side of the existing roadway to widen on (or whether to add lanes symmetrically) will impact how many parcels might be affected by proposed right-of-way . ICE will generate and compare alternatives at the conceptual stage, often presenting options with pros/cons and cost differences and recommendations to aid decision-making. This way , County leaders and the Advisory Committee can be involved to make informed decisions on the preferred concept that balance cost, impact, and benefit. Early Public Engagement for Local Support Another critical aspect at this stage is public involvement, which will be led by our communications partner, The Merchant Strategy . While full public meetings may occur later during design, our Team believes in early and meaningful engagement—especially for projects that have a direct impact on communities, such as the reconstruction of Levy Road through residential areas. ICE and The Merchant Strategy will take the lead in engaging residents, local leaders, and property owners early in the scoping phase through meetings, small workshops, or neighborhood listening sessions, and can develop website information and surveys or questionnaires to poll the affected community and quantify the inputs received so that the County leaders understand the public’s desires. These interactions are vital for capturing community priorities and building support—whether it is concerns about speeding, access, or preserving neighborhood character—which can then be reflected in the conceptual design. 48 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC48 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH The Outcome: Clarity, Speed, and Confidence At the conclusion of the planning and conceptual phase, Jasper County will have a clear roadmap for each project: a defined scope, a baseline schedule, and budget, and documented considerations of environment and utilities. This creates a solid foundation on which designs can proceed at speed. By investing time and expertise in thorough project scoping, ICE will help avoid indecision and scope creep and minimize surprises later. Our approach in this phase is essentially about de-risking the projects early in the program—clearing the path forward so that design engineers, contractors, and everyone involved know exactly what the goal is and what should be expected. Environmental Planning Integration to Minimize Delays ICE’s approach also emphasizes environmental planning integration. Our environmental Team will perform desktop environmental screenings during scoping. Using GIS data, we will map wetlands, floodplains, endangered species ranges, cultural resources, etc., relative to each project. If a planned road widening on US 17 looks like it could encroach on a marsh, we will note the permitting requirements and consider design options (like bridging or shifting alignment) to minimize impacts. By identifying environmental red flags early , we can often streamline the NEPA process later. In one case, an ICE environmental planner discovered a historical site near a planned bridge project during the planning phase – we adjusted the alignment by a few yards and avoided what would have been a lengthy Section 106 historic review . For Jasper County’s projects, we will similarly strive to avoid or minimize impacts at the conceptual stage, saving time in permitting. The planning reports will clearly list anticipated permits (e.g., a Nationwide Permit from the Army Corps for a particular culvert extension), so the County is aware of the likely environmental steps for each project upfront . Data-Driven Conceptual Design Innovative conceptual design is another strength ICE brings. We employ advanced tools like traffic simulation software (Synchro/ SimTraffic, VISSIM) during planning to test and present to decision makers how different design concepts will perform. For example, for the US 278 corridor widening, we can simulate future traffic with and without certain improvements (such as added turn lanes at key intersections or innovative intersection designs) to ensure the concept we pursue will truly alleviate congestion and meet project objectives. We also consider constructability and maintenance of traffic in our concepts – how to build the project without creating additional traffic burdens for those who have to use the road. It might influence whether we build new lanes to one side first or expand symmetrically . Our construction experts weigh in early so that our conceptual designs are realistic and buildable. 49 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH The Challenge of Utility Relocation Relocating utilities is often one of the most challenging and poorly planned aspects of transportation projects – if not managed well, it can lead to delays, cost overruns, and unhappy stakeholders. ICE’s approach to Utility Coordination is proactive, systematic, and founded on strong relationships with utility companies. Our goal is to “clear the path” for each project, like the Pittsburgh Steelers’ Mike Webster opening a hole in the defensive line for Franco Harris to run through, by resolving utility conflicts early and efficiently so that utilities do not become the Achilles’ heel of Jasper County’s Road improvements. Program-Wide Utility Communication Our Utility Coordination Team will begin by notifying all utility owners in Jasper County (and the surrounding region, since some infrastructure like telecom or gas lines might traverse the area) about the passage of the sales tax program and the upcoming projects . Early communication sets a collabor ative tone. We will provide them with maps and descriptions of the project corridors and request information on their existing facilities in those areas. ICE has a database of utility contacts (and we will augment it with local knowledge from County staff who know which companies operate where). The utility owners will be invited to a Utility Coordination Kickoff Meeting where we introduce the program (projects and schedules), establish points of contact and lines of communication, and emphasize that we want to work together to minimize impacts – this meeting helps get buy-in and puts faces to names, fostering partnership rather than adversarial interactions. Project-Level Coordination Framework For each individual project, ICE will follow a structured utility coordination process (aligned with SCDOT’s Utility Accommodation policies and any local protocols). Key steps include: Subsurface Utility Engineering (SUE) We will arrange for SUE services (using a qualified subconsultant if needed) to accurately locate underground utilities in the project areas . Quality Level B (designating) and Quality Level A (test holes) data will be obtained for critical conflict points. This precise information allows us to plot utilities on the design plans and identify conflicts with proposed construction (for example, a water line that runs exactly where a new storm drain is planned). By investing in SUE, we avoid nasty surprises during construction like uncharted lines. COORDINATION Utility 50 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC50 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Utility Conflict Analysis Once we have the existing utility maps and the project’s conceptual (and later detailed) designs, ICE will perform a conflict analysis. We will mark which utilities are in conflict and which might remain in place. For those not impacted, we will obtain letters of “No Conflict” from the owners to document that they have reviewed the plans and foresee no issues . For utilities that are impacted, we categorize the conflicts by severity and type. Relocation Strategy Development ICE acts as the facilitator between the project design team and the utility owners . W e will sit down with each utility company (power, water/sewer, telecom, gas, etc.) to discuss the conflicts and brainstorm solutions. Sometimes, a road design can be tweaked slightly to avoid a utility (for instance, shortening or shifting a culvert to avoid moving a water main). We will pursue those design accommodations where feasible as a first option. Where relocations are unavoidable, we work with the utility to decide new alignments for their lines and coordinate that with the road design. ICE will prepare utility relocation drawings or markups of the road plans showing where utilities could move to, ensuring they do not clash with other proposed relocations . W e also coordinate between utilities – for example, if the power company needs to move poles and the telecom has lines on those poles, we facilitate a combined approach so they relocate in concert or perhaps move underground together, etc. Our utility coordinators will hold regular utility coordination meetings (likely monthly during design phases) to keep all parties informed and working in the same direction. Determining Prior Rights and Cost Responsibility A critical aspect is determining who pays for each relocation. ICE will thoroughly research prior rights – whether the utility has an easement or was there by permit – to establish if the County (project) is responsible for relocation costs or if the utility must cover it . This can be complex, but our Team’s experience with utility agreements and a long history of SCDOT projects will ensure Jasper County does not overpay for relocations. For utilities without prior rights (i.e. in public right-of-way by permit), we will obtain no-cost agreements where the utility owner agrees to move at their own expense . If a utility does hav e prior rights (e.g., an easement that predates the road project), then the project may need to fund the relocation – in those cases, we will negotiate utility agreements that clearly outline the scope and cost, and we will seek ways to minimize that cost (perhaps by including the relocation in the road contractor’s work for efficiency , or standardizing materials). We will explore in-contract utility relocation for cases where it makes sense – meaning the road contractor would perform the relocation as part of the highway contract . This can sometimes be f aster and cheaper, especially for smaller utilities, and we will coordinate such arrangements with the utility owners as needed. Relocation Schedule and Execution Once plans are settled, we will push for utilities to relocate ahead of or during construction in a timely manner. ICE will create a Utility Relocation Schedule that is coordinated with the project construction schedule . W e will monitor progress closely . Our Team will serve as on-site liaisons during relocation work, resolving any field issues (for instance, if a buried cable is found slightly off its assumed location, we work out a quick field adjustment with the designer and utility crew). By keeping a close eye, we ensure relocations happen as planned. 51 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Documentation and Close-out ICE will maintain detailed logs of all utility coordination communications, approvals, and agreements. Before a project goes to construction, we will have a Utility Clearance Letter on file indicating all utilities are addressed (either relocated or protected in place) so that the contractor knows they have a clear site, except for any coordinated work. What Sets ICE's Utility Coordination Apart ` P ersistent, Proactive Communication We engage utility providers early—and follow up often—to keep project needs at the top of their priority list. ` Str ong Industry Relationships Our team has long-standing connections with South Carolina utility companies and understands their processes, preferences, and constraints. ` Utility-Specific Scheduling Insight W e plan around utility needs—like telecom providers preferring a single relocation phase with ample notice—so nothing falls through the cracks. ` T ech-Enabled Coordination We use shared GIS maps, live utility databases, and collaboration platforms to streamline communication and track relocation updates in real time. 52 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC52 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH From Plans to Pavement: Delivering with Confidence and Control When it comes to turning plans on paper into pavement on the ground, ICE’s Construction Administration approach ensures that construction is executed safely , efficiently , and to the highest quality standards. We see Construction Administration as the phase where all the careful planning and design pays off – and we are there every step of the way to protect the County’s interests and deliver a successful project. Jasper County’s sales tax program will involve many construction contracts over the years, from small intersection upgrades to multi-mile widenings, and even possibly amenities for Greenbelt projects. ICE’s seasoned CEI Team will oversee these with a consistent, rigorous methodology . Pre-Construction Services Our involvement in construction starts even before a contractor breaks ground. ICE will assist Jasper County with bid package preparation and procurement for each project. We will ensure the construction documents (plans, specifications, contract provisions) are clear, biddable, and reflective of the County’s requirements. In particular, we will incorporate any necessary local provisions such as traffic management constraints (e.g., no lane closures during peak hours on US 278) and DBE participation goals. We will support the County’s procurement process by conducting pre-bid meetings, answering contractor questions (issuing addenda as needed), and evaluating bids for completeness and responsiveness. Once a contractor is selected, ICE can facilitate the pre- construction conference to align expectations between the contractor, County , and any third parties (utilities, etc.). Construction Inspection and Oversight ICE will provide on-site CEI services for the program’s projects, acting as the County’s eyes and ears on the job site. Our certified inspectors and resident engineers have extensive experience on SCDOT and local projects, which means they are intimately familiar with roadway construction methods, SCDOT standard specs, and quality requirements. The RFQ allows the Program Manager to perform CEI, and ICE has a full CEI division ready to deploy . For each active construction contract, we will assign a Resident Project Representative (RPR) – a highly qualified engineer or inspector who will be on site daily to inspect the work, coordinate with the contractor, and ensure compliance with plans and specs. Supporting the RPR will be a team of inspectors (scaled to the project’s needs – a big widening might have multiple inspectors for structures, earthwork, paving, etc., whereas a small sidewalk project might need one part-time inspector). All our inspectors hold necessary certifications (ACI concrete, NICET, asphalt roadway technician, erosion control, etc.) to test materials and verify workmanship meets or exceeds standards. ADMINISTRATION Construction Quality Assurance ICE will implement a Quality Management Plan for construction. This includes detailed daily inspection reports (documenting weather, work performed, manpower, equipment, materials, tests, etc.), material sampling and testing protocols (ensuring, for instance, that asphalt delivered meets mix design and density requirements), and prompt issue tracking. If any deficiencies are observed – say concrete that does not meet strength or a curb that is not to line/grade – our Team will flag it and ensure the contractor corrects it, either by repair or replacement, at no cost to the County . Our philosophy is “build it right the first time,” and we work closely with contractors to achieve that. However, if issues arise, we are resolute in enforcing the contract. Contract Administration and Compliance ICE’s construction managers will handle the myriad of administrative tasks that come with construction. We will review the contractor’s baseline schedule and monitor schedule updates, verifying that sufficient progress is being made. If a contractor falls behind, ICE will proactively engage them with recovery plan discussions to mitigate delays. We will process submittals and shop drawings – reviewing contractor submissions (or forwarding to the design engineer when technical) in a timely manner so as not to hold up work. Our Team will also evaluate change order requests – only those merited by unforeseen conditions or minor owner-directed changes will be recommended, and we will negotiate fair pricing using our cost estimate skills and by analyzing contractor provided breakdowns. An important part of contract administration is pay application review . ICE will thoroughly check the contractor’s monthly pay requests against field progress. We will verify that claimed quantities of work were indeed installed and meet specifications before recommending payment. This protects the County from overpayment and ensures the pay reflects true progress (which ties into our budget tracking for the program). Safety and Environmental Oversight Safety oversight is another duty – we will monitor that the contractor is following OSHA regulations and project-specific safety plans. For example, on a roadway project, we will continuously check that proper traffic control (signs, cones, flaggers, if needed) is in place to protect both workers and the traveling public. If we see any unsafe conditions, our inspectors are empowered to immediately require corrections or pause work if necessary . Safety is non-negotiable in our approach. Environmental compliance during construction will also be watched. Jasper County’s beautiful environment must be protected even as we build roads. ICE inspectors will ensure that erosion and sediment control measures (silt fence, construction entrances, etc.) are properly installed and maintained, and that there are no violations of environmental permits (like improper wetlands disturbance or turbidity in streams). We document these inspections and any corrections, keeping the project in good standing with regulators. 53 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH 54 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC54 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Traffic and Stakeholder Coordination Traffic and stakeholder coordination during construction is something ICE will actively manage. Construction can be disruptive – lane closures, detours, noise – and we will minimize those impacts through careful coordination. Our Construction Team will send out weekly look-ahead schedules to stakeholders (schools, emergency services, public via website) to inform them of any significant traffic impacts coming. We will coordinate with SCDOT District traffic engineers for any required lane closure approvals on state routes. If work is occurring in a neighborhood (like Levy Road reconstruction), we might go door-to-door beforehand with flyer’s, so residents know what to expect and whom to call. The program web site will be frequently updated for project construction information. Because we were involved from the start, our Team will be familiar faces, maintaining trust built during the earlier phases. Final Close-Out and Continuous Improvement Closing projects out properly is the last step of our construction administration. ICE will ensure punch list items are addressed thoroughly , and we will not recommend final acceptance until everything is completed to standards. We will gather all as- built drawings (surveys and redlines from the contractor) and deliver organized project files to the County for maintenance records. We will also verify all warranties and guarantees are in place for materials or equipment. A successful close-out also includes reflecting on lessons learned – ICE does post-project reviews to capture any insights that can be applied to future projects in the program (continuous improvement). Why ICE's Construction Approach Works What sets ICE apart in Construction Administration is our depth of experience and commitment to timely , on- budget delivery without sacrificing quality . We have managed construction on interstate interchanges with multi-year schedules and on small sidewalk jobs – in all cases, we treat the project as if we are the owner. Our construction managers are adept at problem-solving on the fly . For instance, if unexpected poor soil is found (something that can happen in the Lowcountry), we quickly convene with geotechnical engineers and propose solutions (undercut and backfill, soil stabilization, etc.) to keep the job moving – all while negotiating costs so the County is not blindsided. Finally , we recognize that Jasper County’s program will run for many years, and construction technology and methods evolve. ICE stays at the forefront of industry practices – whether it is new materials, accelerated bridge construction techniques, or improved project management software. We will continuously improve our construction administration approach by adopting proven innovations that can save time or money for the County . In summary , ICE’s Construction Administration approach is to ensure that plans translate to successful projects on the ground. Through diligent oversight, effective communication, and a solutions-driven mindset, we will deliver each project to Jasper County’s expectations. When a project is finished – say a widened Argent Boulevard is opened to traffic, or a new park is opened along the Savannah River – we want the County and its citizens to celebrate not just the end result, but also to be proud of staff, to look back and say , “That project went very smoothly .” Our approach will make that outcome the rule, not the exception. 55 Statement of Qualifications | INFRASTRUCTURE CONSULTING & ENGINEERING, LLC Section D | SCOPE OF WORK APPROACH Conclusion: A Trusted Partner for a Transformative Program Jasper County’s Transportation Sales Tax Program is ambitious and transformative. It requires a Program Manager with vision, experience, and dedication equal to the task. ICE’s proposed approach – rooted in best practices and customized for Jasper County – will ensure the program’s success from planning through construction. We will manage the big picture without losing sight of the details, always guided by the principle that this program is for the people of Jasper County . Our narrative-driven and collaborative style of management will keep everyone – officials, stakeholders, and citizens – on the same page and informed of the progress and value being delivered. By choosing ICE, Jasper County gains a partner who has the technical knowledge, the local and regional experience, and the passion to deliver. We will turn the list of projects and initiatives approved by the voters into a legacy of safer roads, stronger communities, and protected landscapes. ICE is ready to begin immediately , and we are committed to seeing the program through to its successful completion. Together, let’s build the future of Jasper County – one road, one bridge, one green space at a time – and do it with excellence and integrity . Task Description DELIVERABLE September Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 ICE FEE 1 Task 1 - Program Management Services 1.a. Assist the County in obtaining Local Public Agency (LPA) status with South Carolina Department of Transportation (SCDOT) and compliance with LPA. 1/31/2026 1.b. Coordinate, manage, and review Project plans, technical reports, specifications, and estimates prepared by project design consultants providing professional services to the County, for consistency with contract budgets, schedules, scope of work, design criteria, and applicable standards. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.c. Update Project cost estimates (25) annually 12/31/2025 1.d. Prepare independent cost estimates for Project professional services and assist the County with scope, schedule, and fee negotiations with Project design consultants, also to include the civil site improvements associated with the Greenbelt Initiatives. 12/31/2025 1.e. Review Project design consultant invoices for accuracy, compliance with contract terms, and progress of the work. This shall include civil site improvements associated with the Greenbelt Initiatives. Monthly 1.f. Conduct meetings, monitor design progress, and keep the County informed of each Project’s status. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.g. Coordinate with municipalities, environmental agencies, and other project stakeholders as applicable to secure necessary approvals and permits prior to the construction letting. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.h. Ensure that all necessary permits and environmental approvals are obtained prior to letting a Project for construction. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.i. Ensure that all rights and easements necessary for the project are acquired prior to the construction letting. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.j. Ensure that all utility coordination activities necessary to facilitate project construction have been performed prior to the construction letting. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.k. Perform technical, constructability, and maintainability reviews, including life cycle costs, accessibility, equipment clearances, etc. prior to the construction letting. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.l. Responsible for overseeing the preparation of construction bid documents by the project design consultants, including the review of plans, specifications, estimates of quantities, bid schedules invitations to bid or request for proposals that shall comply with the County procurement code. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.m. Conduct pre-bid meetings, review bids, and advise the County through selection and contract award process. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.n. Coordinate and/or conduct value engineering studies and recommendations as may be requested to reduce construction costs. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.o. Review and maintain project related correspondence and files. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 1.p. Perform public outreach activities including public meeting facilitation, mailer and handout design, coordinate response to public comments and meetings, or as required. This shall include civil site improvements associated with the Greenbelt Initiatives. As-Needed 2 Task 2 – Program and Financial Management 2.a. Provide a written monthly Program Status Report for County staff and Council, due by 12:01p.m. local time on the 15th of each month. 15th of each month 2.b. Attend all meetings associated with the program as directed by the County. As-Needed 2.c. Prepare a Program Management Plan that will serve as the playbook for the entire sales tax program. This document will outline governance, communication protocols, public information and reporting strategies, risk management strategies, quality control measures, and every aspect of program execution. 12/31/2025 2.d. Prepare a Master Program Schedule that sequences all projects over the 15-year period, using logical priorities, dependencies, and funding flows. The master schedule shall integrate individual critical path method project schedules into a program-wide Gantt chart that clearly shows and tracks critical tasks and deadlines a for the design, right of way acquisition, permitting, and construction for all projects within the program and the timeline for Greenbelt acquisitions/improvements. This will be updated quarterly and as projects progress. 3/31/2025 2.e. Develop and maintain a Program Financial Plan to forecast Program revenues, project expenditures, and cash balances. The financial plan shall be in accordance with the CIP and the Consultant will participate in the County’s annual CIP planning process. Revenue and cash reports will be County derived and maintained. 12/31/2025 2.f. Provide quarterly financial reports to include revenues, encumbrances, and expenditures, due 30 days after the end of the quarter, using data provided by the County Finance Department. 30 days past Quarter 2.g. Develop and implement a Public Involvement Plan which shall include a Program website, strategic use of social media, holding public meetings as requested to provide accurate, up to date project information to the citizens of Jasper County. This shall include civil site improvements associated with the Greenbelt Initiatives. 12/31/2025 2.h. Develop and manage a dedicated Program Website, hosted and maintained by the Consultant with a link to/from the County’s web site, to display program information, project updates, interactive maps, timelines, and financial summaries, FAQ as well as an option for citizens to ask question or provide input. 12/31/2025 2.i. Develop and implement a project Data Management System that provides readily accessible, complete, and well-organized files for each project. 12/31/2025 2.j. Provide the County with recommendations for the timing and amount of bond issuances, based upon the Program Financial Plan. 3/31/2026 2.k. Review and recommend methods to maximize efficiency and achieve economies of scale in the procurement of projects. Annually 2.l. Develop consistent Design Criteria, standards, and specifications for use on projects developed by the Program where needed due to no available or applicable SCDOT design criteria or SCDOT standard specifications. 12/31/2025 2.m. Investigate and recommend available Grant Opportunities on behalf of the County. Ongoing/Annual 2.n. Assist with document production related to Freedom of Information Act (FOIA) requests and other requests for information as applicable. As-Needed 2.o. Assist with the development of encroachment permits, intergovernmental agreements (IGA), memorandums of understanding (MOU), memorandums of agreement (MOA) and financial participation agreement (FPA) to facilitate coordination with the SCDOT, South Carolina State Infrastructure Bank (SCSIB) and other applicable parties as needed. As-Needed 2.p. Determine a method to evaluate project risk and cost, conduct risk analysis as needed, and make recommendations based on analysis. (Risk Analysis per SOQ) 12/31/2025 2.q. Conduct bid analysis/evaluation of bids or prepare cost estimates for comparison when appropriate. Provide engineers probable opinion of cost when requested. As-Needed 3 Project Planning, Scoping, and Conceptual Design Establish the scope of improvements, cost estimates, and baseline cost-loaded schedules for each project including the following subtasks. This would include civil site improvements associated with the Greenbelt Initiatives. 1/31/2026 A. Development of Conceptual Project Design Perform feasibility and initial constructability review of a conceptual design and scope of each project. Provide baseline costs and schedule, to include design, right-of-way, construction, utility coordination, utility relocation, and permitting. The conceptual designs shall be developed in accordance with the South Carolina Department of Transportation (SCDOT) Highway Design Manual and the American Association of State Highway and Transportation Officials (AASHTO) “A Policy on Geometric Design of Highways and Streets”. Conceptual designs shall be developed on aerial photography and available GIS. Design features to be illustrated shall include the proposed roadway typical sections, roadway alignments, lane configurations, auxiliary intersection turn lanes, and bicycle & pedestrian facilities. The conceptual designs shall be presented on color roll-plots for coordination with project stakeholders and on 11” x 17” size sheets for incorporation into a project planning report. PROJECT SPECIFIC SCHEDULE 5-YEAR SCHEDULE - JASPER COUNTY SALES TAX PROGRAM MANAGEMENT *This schedule is for the Planning Phase, based on a Notice To Proceed of September 1 EXHIBIT C July 2025 PLANNING PHASE 2025 2026 2027 2028 2029 2030 Work to minimize impacts to private property, buildings, cultural features (churches, cemeteries, parks, etc.), major utilities, and natural resources in the development of the project conceptual designs. COUNTY GIS property lines shall be referenced into the conceptual design to estimate right of way impacts for each project. Impacts on buildings and cultural features shall be estimated from aerial photography and a project field review. Perform an environmental screening to determine the presence of likely hazardous material sites, threatened and endangered species, historical/cultural resources, floodplains, and jurisdictional wetlands within the project area. The presence of these environmental constraints will be determined through a windshield survey and database searches. Identify the expected permits and NEPA compliant environmental document (Categorical Exclusion, Environmental Assessment, or Environmental Impact Statement) required for each project based on conceptual design and environmental screening. B. Baseline Cost Estimates and Schedules Prepare a cost estimate for each project based on the conceptual project design. Project cost estimates shall represent the total cost of project development and include the following typical project costs: 1/31/2026 o Engineering services (planning and design), o Right of way acquisition (land and services), o Wetland mitigation, o Utility relocation (utilities with prior rights), o Construction, o Construction engineering & inspection. Appropriate factors shall be applied in coordination with the COUNTY to provide for contingency within each project budget to address unforeseen conditions. Baseline schedules to be developed for each project shall include the project phases of planning and design, right of way acquisition, environmental permitting, utility coordination, construction procurement, and construction. Cost estimates associated with each of these project phases shall be used to create a cost loaded schedule for purposes of program financial planning. 1/31/2026 Evaluate projects through a cost-risk analysis to identify risks to the project scope or schedule which may significantly impact project cost. A cost-risk workshop will be conducted for each project to engage subject matter experts in a review of the projects to identify potential risks based on their experience with transportation project development in the area. The project cost estimate will be refined to account for the magnitude and likelihood of each identified risk. 3/31/2026 C. Environmental Overview Prepare a Project Planning Report for each project to present the conceptual design, environmental overview, utility overview, cost estimate, and schedule. The reports shall contain the following information: 3/31/2026 o Draft Purpose and Need Statement, o Project Description, o Design Criteria, o Conceptual Design, o Project Location and Length, o Environmental Constraints o Identify the Required NEPA Environmental Document, o Identify the Required Environmental Permits, o Utility Information o Cost Estimate o Schedule These reports will be submitted to the County and SCDOT (if applicable) for review and comment. All comments will be addressed as applicable in a comment response matrix and revised final reports will be provided to the County. 4/31/2026 D. Plan Review For projects on SCDOT roadways or within SCDOT ROW, the consultant shall conduct a cursory review prior to submittal to SCDOT. The review will ensure that plans satisfy SCDOT requirements and foreseeable errors are addressed. Detailed review of design and/or calculations will not be required. As-Needed For projects in the County or municipal system, the consultant will act as the County reviewer and will review for design, calculation, adherence to appropriate standards and specifications, and constructability. As-Needed If plans require submittal to County planning or other departments for review, then the Consultant will facilitate and communicate as needed As-Needed 4 Task 4 – Utility Coordination Services 4.a. Prepare a Utility Coordination Plan for the Program, to guide the procedures for an ongoing process from conception to construction, to include Proactive Conflict Identification, Collaboration & Communication, Data-Driven Decisions, Risk Assessments and Mitigation Strategies, & Contingency Planning and Budgeting, Regular Joint Meetings, and Legal Rights and Contractual Agreements. 12/31/2026 4.b. Notify all known utility owners in the area of the projects and identify those utilities with existing and proposed facilities in the project areas. 12/31/2025 4.c. Facilitate and act as intermediary between project design team and utility representatives. 4.d. Hold regular joint utility meetings with utilizes once initial projects begin design phase. Ongoing 4.e. Arrange for Project Design teams to employ Subsurface Utility Engineering (SUE) to establish utility locations and identify conflicts . As-Needed 4.f. Obtain letters of “no-conflict” for those utilities which are not impacted. As-Needed 4.g. Coordinate with utility owner(s) and designer(s) to develop relocation plans for those conflicts which cannot be eliminated. As-Needed 4.h. Review all utility owners’ relocation plans to ensure that relocations proposed by one owner do not conflict with another’s relocation. As-Needed 4.i. Establish prior rights of occupancy. As-Needed 4.j. Obtain no-cost letters from those utility owners without prior rights or develop utility agreements with those owners who can document their prior rights. As-Needed 4.h. Evaluate the feasibility of in-contract utility relocation and develop necessary agreements in coordination with the utility owner. As-Needed 4.i. Develop Contractual Provisions and Incentives: As-Needed 4.j. Clear Utility Relocation Clauses: Incorporate explicit clauses in construction contracts that clearly define responsibilities for utility coordination, relocation, and unexpected discoveries. As-Needed 4.k. In utility agreements consider incentives for early relocation and penalties for unreasonable delays. As-Needed 4.l. Monitor the progress of utility relocation and incorporate utility relocation schedules into the overall project schedule and master program schedule. As-Needed 4.m. This shall include Utility Coordination Services for civil site improvements associated with the Greenbelt Initiatives. As-Needed 5 Task 5 - Right of way Acquisition Services 5.a. Prepare a Right of Way Acquisition Plan for the Program 12/31/2025 5.b. Provide R-O-W services to coordinate, plan, direct, and control R-O-W activities necessary to legally acquire and record R-O-W needed for construction, ensuring that all R-O-W acquired complies with all other applicable laws, ordinances, regulations, policies, etc. As-Needed 5.c. Forecast and estimate R-O-W acquisition schedules and R-O-W cash flow expenditures and timelines for acquisition. 3/31/2026 The following services will be performed on an as-needed basis for the individual projects, 5.d. Perform title search and provide title opinions for parcels requiring acquisition. As-Needed 5.e. Provide appraisal cost estimates for acquisitions, by a South Carolina licensed appraiser. As-Needed 5.f. Procure or perform appraisals and review the appraisals provided by others. As-Needed 5.g. Negotiate acquisitions, providing a translator when necessary. As-Needed 6 Task 6 – Program Construction Administration 6.a. Constructability reviews of plans and specifications prepared for projects prior to construction letting. 6.b. Attend pre-construction conferences, routine construction coordination meetings, etc. 6.c. Reviewing and maintaining records of plans, specifications, shop drawings, revisions, correspondence, warranties, etc. 6.d. Monitor each construction project and prepare monthly status reports. 6.e. Evaluating and recommending actions related to progress payments, change requests, claims, disputes, 6.f. Performing project close-out activities. 6.g. Fostering and maintaining a positive public image related to construction operations by proper interaction with the public and media, maintenance of traffic, attention to safety, permit compliance 6.h. This shall include Construction Administration for civil site improvements associated with the Greenbelt Initiatives. EXHIBIT D FEE PROPOSAL - TRANSPORTATION SALES TAX PROGRAM MANAGEMENT July 2025 Task Task / Deliverable Descrip�on Fee 1 PROJECT MANAGEMENT SERVICES – Hourly Allowance, Includes Project Task Orders $3,000,000.00 Project specific Task Orders shall be issued and assigned under this as they are activated, each with a refined scope, schedule and fee – Assume 12 projects started in first 5 years 2 PROGRAM AND FINANCIAL MANAGEMENT – Hourly Allowance $950,000.00 3 PROJECT PLANNING, SCOPING, AND CONCEPTUAL DESIGN – Hourly Allowance, Includes Project Task Orders $2,000,000.00 Project specific Task Orders shall be issued and assigned under this as they are activated, each with a refined scope, schedule and fee – Assume 12 projects started in first 5 years 4 UTILITY COORDINATION SERVICES – Hourly Allowance $600,000.00 5 CONSTRUCTION ADMINISTRATION – Hourly Allowance (NOT CEI) $700,000.00 6 RIGHT OF WAY ACQUISITION SERVICES – Hourly Allowance $700,000.00 INDIVIDUAL EARLY DELIVERABLES – TOTAL (Each at LUMP SUM) $250,000.00 Individual Deliverables – Each at Lump Sum LS 2.c. Program Management Plan $36,000 2.d. Master Program Schedule $25,000 2.e. Program Financial Plan $32,000 2.g. Public Involvement Plan $22,000 2.h. Program Web Site Development and Startup $20,000 2.i. Data Management Plan / System $32,000 2.l. Design Criteria and Standards $15,000 2.q. Risk Analysis Method $24,000 4.a. U�lity Coordina�on Plan $20,000 6.a. R/W Acquisi�on Plan $24,000 GREENBELT WORK, UNKNOWNS and ADD’L SRVCS $700,000.00 DIRECT REIMBURSABLES $85,000.00 FIRST 5 YEARS – ESTIMATED N.T.E. TOTAL FEE = $8,985,000.00 Billing & Invoicing • Work shall be invoiced Monthly based on actual hours (�me & materials) capped by NTEs. • The atached Hourly Rate sheet (Exhibit E) includes the personnel direct labor rate with a 3.0 mul�plier to produce the contract billing rates. • Unit Lump Sum rates for the individual early deliverables shall be billed at % complete. • Allowable Reimbursables shall include mileage at the IRS standard business mileage rate, federal per diem for travel greater than 4 hours, reproduc�on, mailing or delivery services, public mee�ng and field work incidentals, and shall be billed at cost. • Sub-consultant fees will not be marked up , but �me spent managing sub-consultant contracts shall be billed accordingly. EXHIBIT E ICE HOURLY RATES JASPER COUNTY TRANSPORTATION SALES TAX PROGRAM MANAGEMENT Annual escalation of hourly rates shall be allowed per contract in accordance with the Consumer Price Indexing Name Job Title Jasper County Project Role July 2025 Direct Labor Rate Contract Hourly Billing Rate ICE: 3.0 X Direct Labor Mitchell Metts VP of Special Projects Sr. Engineer $100.96 $303 Leland Colvin Vice President - Special Projects SCDOT Liaison $112.98 $339 Les Blankenship Vice President/Chief Administrative Officer Legal Review $100.96 $303 Jeff Buckalew Program Manager Project Manager $79.33 $238 Bryan McIlwee Project Manager Deputy Project Manager $75.48 $226 Alexis McIlwee Water Resources Designer Designer $45.67 $137 Josh Apsitis Assistant Project Manager Engineer $61.44 $184 Barrett Stone Vice President & Environmental Services Manager Sr. Biologist / Environmental Dept Head $88.94 $267 Cody Conner Senior Environmental Specialist Biologist / Environmental $46.96 $141 Daniel Koon Jr. Environmental Specialist Biologist / Environmental $26.49 $79 Gus Kretschmer Utility Coordinator Uitlity Manager $80.22 $241 Matthew Cox Utility Coordinator Utility Coordinator $67.50 $203 Jenny Germuth Sr. Transportation Engineer Sr. Designer $72.12 $216 Andy Gillis VP of Special Projects Sr. Engineer $85.58 $257 Aaron Livingston Project Manager Project Manager / Sr. Engineer $96.15 $288 Clarke Hinson Manager of Roadway Group (Charleston) Project Manager / Sr. Engineer $79.33 $238 Alex Nettles Roadway Engineer Sr. Designer $68.80 $206 Preston Felkel SC Structures Manager Project Manager / Sr. Engineer $96.15 $288 Ray Spence Structural Engineer Project Manager / Sr. Engineer $90.48 $271 Clark Baer Structural Engineer Engineer $61.15 $183 Jay Thompson VP - Pavement Consultancy Services Project Manager / Sr. Engineer $98.56 $296 Shilpa Girish Pavement Designer Designer $39.23 $118 Stuart Timmons SC Upstate Design Manager/Hydro Manager Project Manager / Sr. Engineer $86.54 $260 Jordan Bianchi Hydro Designer Designer $51.49 $154 Renee Mulholland Environmental Planner Biologist / Environmental $65.22 $196 Henry Phillips Sr. NEPA Planner Biologist / Environmental $65.87 $198 Trinaty Geraurd Assistant Project Manager - Special Projects Designer $39.42 $118 Marc LeMin VP - CM CE&I Services (SC Lowcountry) CEI Manager / Sr. Engineer $96.15 $288 Randy Carraway Project Manager Construction Manager / Sr. Engineer $98.56 $296 Todd Steagall Construction Project Manager Construction Manager / Sr. Engineer $100.48 $301 Eric Dillon Project Engineer Sr. Traffic Engineer $82.88 $249 Craig Nelson Traffic Engineer Traffic Engineer $58.17 $175 Lisa Schwartz Document Control Manager/Program Coordinator Adminstrative / Data Management $42.39 $127 The Merchant Group Public Information Sub-Consultant Sharon Merchant, Principle QA / QC $200 Cheryl Scott Public Involvement Officer Project Lead $150 Colleen Hackett Public Involvement Specialist Project Asssistant $125 RND Consultants Right of Way Acquisition Sub-Consultant Janice Bergeron Principle QA/QC $341 Nathan Midkiff Project Manager Right of Way Agent Lead $205 Renee Bergeron Project Engineer Right-of-Way Agent $115 Tracy DeFreitas Administrator Right-of-Way Assistant $125 July, 2025 ICE HOURLY RATES - JASPER COUNTY TRANSPORTATION SALES TAX PROGRAM MANAGEMENT 181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com An Equal Opportunity Employer Jim Iwanicki, P.E. Engineering Services Director Jasper County, SC 623 Live Oak Road P.O. Box 1244 Ridgeland, SC 29936 Date: August 5, 2025 Subject: Fee Justification for Program Management Services – Jasper County Transportation Sales Tax Program Overview of Program Scope and Fee Context The approved $376 million Transportation Sales Tax Program will fund approximately 16 major transportation infrastructure projects over the next 10 to 15 years, involving significant planning, design coordination, permitting, right -of-way acquisition, public engagement, utility coordination, construction, and inspection responsibilities. ICE will serve as the County’s trusted advisor and implementation partner to ensure these projects are delivered on time, within budget, and in compliance with federal, state, and local standards. The proposed $8.95 million not -to-exceed fee reflects a fair and appropriate investment in professional program management services and equates to approximately 2.4 % of the total program value, a percentage well within industry norms for similar sales tax programs in other counties across South Carolina and the Southeast. Breakdown of Key Services Included ICE’s scope of services includes the following core components over the first five years: Program Management and Administration • Program startup, scheduling, staffing, budgeting, and reporting • Develop Program plans and guidance documents • Ongoing coordination with County staff, elected officials, and the Advisory Committee • Monthly progress reports and annual program performance assessments Public Engagement and Communication • Development and maintenance of a program website and project map • Creation of public outreach materials and social media content • Coordination of public meetings, stakeholder engagement, and Council presentations Financial Oversight and Funding Strategy • Development and maintenance of the program cash flow model • Budget tracking, invoice reviews, and financial reporting 181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com An Equal Opportunity Employer • Assistance with matching funds, grants, and leveraging opportunities Project Planning and Design Oversight • Development of scopes, schedules, and cost estimates for individual projects • Procure services of design firms • Coordination with design consultants and technical review of submittals • Conceptual design and engineering feasibility assessments where required Fee Structure and Staffing Below is the estimated "Not to Exceed" (NTE) fee for Infrastructure Consulting and Engineering (ICE) to provide program management services for Jasper County's 15 -year, $376M transportation sales tax program (2025–2030). The $8.95 million estimate is based on estimated hours for key personnel, including a dedicated Program Manager (PM) at a rate of $260/hour and support staff such as Project Engineers, Public Engagement Specialists, Construction Coordinators, and Administrative Support, all billed at competitive industry-standard rates. ICE has structured the team to provide maximum value and flexibility to the County while maintaining a lean and responsive staff footprint. Fee Estimate Summary (Years 2025–2030) Task Description Estimated Hours Estimated Fee Task 1 Project Management 14,900 $3,000,000 Task 2 Program & Financial Management 4,715 $950,000 Task 3 Planning, Scoping & Concept Design 9,900 $2,000,000 Task 4 Utility Coordination 2,860 $600,000 Task 5 Construction Administration 3,036 $700,000 Task 6 ROW Acquisition Services 2000 + unit costs $700,000 Subtotal = $7,950,000 Early Deliverables = $250,000 Greenbelt Initiatives (Unknowns) = $700,000 Reimbursable Expenses = $85,000 TOTAL ESTIMATED N.T.E. FEE (Years 1-5) = $8,985,000 Breakdown by Task Task 1: Project Management Services • Scope: Design firm procurement, IGA/LPA coordination, design oversight, cost estimating, bid management, public outreach. • Effort: High ongoing effort • Fee: $3,000,000 181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com An Equal Opportunity Employer Task 2: Program & Financial Management • Scope: Program plans, master schedule, financial forecasting, public involvement, FOIA/grants. • Effort: Intensive in Year 1 (setup), then 120 hrs/month. • Fee: $950,000 Task 3: Project Planning & Conceptual Design • Scope: Feasibility, environmental screening, cost -risk analysis, planning reports for 6 priority projects and 5 intersection projects. • Effort: 800 hrs/project (top 6 priority projects and 5 intersection projects by 2030). • Fee: $2,000,000 Task 4: Utility Coordination • Scope: Utility conflict resolution, SUE coordination, relocation agreements. • Effort: Varies by project. 40 hrs/project/month during design/ROW phases. • Fee: $600,000 Task 5: Construction Administration • Scope: Constructability reviews, attend construction meetings, document control, monthly status reports • Effort: Varies by project • Fee: $700,000 Task 6: ROW Acquisition Services • Scope: Title searches, appraisals ($1,500/parcel), negotiations ($200/hr), relocation support. • Effort: 60 hrs/project + unit costs. Assumes 200 parcels acquired in 5 years. • Fee: $700,000 Total 5-Year NTE Fee: $8,985,000 Annual Average: $1.79M/year Percent of Total Program: 2.4% The estimate assumes: • Full program ramp-up in Year 1 and continued active delivery in Years 2–5 • Strategic use of ICE personnel to reduce reliance on higher-cost specialty consultants • Efficient use of time and budget through proactive management and prioritization Other Key Assumptions: • Program Duration: 15 years total, but fees estimated for first 5 years (2025 –2030) as requested, and assuming 12 project are activated in first 5 years. • Project Phasing: 16 projects staggered over 15 years. Years 1–5 focus on planning, design, ROW, and early construction for 6 priority projects and 5 intersection projects. 181 Bluffton Road, Suite C-102 | Bluffton, SC 29910 | 843-485-3560 (P) | www.ice-eng.com An Equal Opportunity Employer • 2025 Hourly Rates: (direct labor X 3.0, blended for unit rate and escalated at 2.5% annually) • ROW Costs: Based on industry standards for South Carolina (appraisals, title searches, negotiations). Non-hourly unit costs included. • Greenbelt involvement, scope volatility and unforeseen complexities (e.g., environmental delays, ROW disputes) is an unknown. • Task Weighting: Higher effort in early years for program setup, planning, and ROW. Comparison to Other Counties Fee comparisons from other South Carolina counties with similar sales tax programs support the reasonableness of this proposed fee: • Charleston County (2022): $2.1 billion program, 1.1% PM fee over first phase • York County (2017): $277 million program, 1.5% PM fee • Berkeley County (2019): $587 million program, ~1.3% for program and construction oversight combined At 2.4% of Jasper County’s $376 million program, ICE’s proposed fee is below the industry average of 3-6% for full program management and consistent with regional norms and reflects the relative scale, geographic complexity, and required support functions for a successful program. Conclusion The proposed fee is a reasonable, necessary, and competitive cost to ensure professional delivery of one of Jasper County’s most significant public infrastructure investments. ICE is committed to full transparency, continuous accountability, and delivering high-value services that maximize every dollar of the sales tax funding entrusted to this program. We look forward to serving as your long -term partner and delivering these important projects for the citizens of Jasper County. Respectfully submitted, Jeffrey S. Buckalew, PE Program Manager Infrastructure Consulting & Engineering

Source: Jasper County website. First collected Oct 17, 2026.