08.22.2025
Jasper County · Jasper County · meeting of Aug 22, 2025 · Minutes
Open the original document More from Jasper County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Minutes of the Jasper County Council Transportation Sales Tax
Advisory Committee Meeting
Date: August 22, 2025
Body: Jasper County Council Transportation Sales Tax Advisory Committee (TSAC)
I. Opening and Introductions
1.Pledge of Allegiance and Prayer: The meeting opened with the Pledge of Allegiance and a prayer for
deliberation, time, and energy to fulfill the promise of improving Jasper County roads.
2.Introduction of Consultant: Representatives of Infrastructure Consulting Engineers LLC (ICE),
referring to them as "the consultant" or "program manager".
II. Program Management Contract Review and Recommendation
1.Contract Development: The proposed contract with ICE was developed based on the scope of work
outlined in the Request for Qualifications (RFQ) and adjusted through discussions to address potential
missing items upfront.
2.Contract Flexibility: The contract terms were designed to be flexible, allowing the Committee to add
and subtract projects as deemed wise, providing ease for County Council by avoiding the need for
approval on every minor adjustment.
3.Financial Terms (Not-to-Exceed Fee):
◦ The fee is structured based on assumed tasks and 12 projects being moved forward in the first
five years (though this could range from 8 to 15).
◦ The proposed not-to-exceed fee for program management is $8.95 million over the first five
years.
◦ This amount is approximately 2.4% of the total program cost during that initial period.
◦ The estimated program management cost for the full 15-year life of the program is projected to
be around 6.1%, noting the front-loaded costs required to rapidly stand up the operation.
4.Recommendation Sought: The Committee recommend to County Council that the contract is fair and
reasonable. The contract is scheduled to go before County Council on September 2nd for approval.
III. Discussion of Consultant Scope and Strategy
1.Project Urgency and Funding: Mr. Mayor of Hardeeville noted that Argent Boulevard is the
Committee's top priority, and constituents are anxious for design work to start. He recommended that if a
small bond is required to initiate funding immediately, he is in favor of it to "get moving as soon as
possible".
2.Consultant Duties (Program Management Defined):
◦ ICE will help determine financial needs (how much money is required and how to acquire it,
e.g., bonding) and ensure funds are spent wisely.
◦ ICE ensures the county adheres to SC DOT rules when working on jurisdictional roads (like
Argent Boulevard), preventing costly rework.
◦ ICE handles the entire process, including requesting qualifications (RFQs) for separate design
engineers, reviewing construction documents, managing right-of-way acquisition, and utility
coordination.
◦ ICE will manage construction letting, bid receiving, recommending awards, and overseeing
construction inspection to ensure materials meet DOT standards.
3.Leveraging Funds: ICE will coordinate with agencies like the Low Country Council of Governments
(COG) and the Metropolitan Planning Organization (MPO) to secure additional federal and state
money to supplement and leverage the local sales tax dollars.
4.Local vs. Federal Determination: The Committee discussed the need to determine early whether
projects will be local or federal. This decision is critical because changing funding sources mid-project
(e.g., from local to federal) requires restarting, which wastes money. ICE will help make this "very first"
determination.
5.Public Transparency Strategy:
◦ Public information is considered a "big component".
◦ An expert public relations firm will serve as a subconsultant to quickly stand up a website/
public-facing program to ensure transparency regarding financial expenditures, project status,
and schedules.
◦ The initial cost of standing up this communications program is why the initial percentage of the
management fee is higher.
◦ A suggestion was made to use QR codes at project sites to link directly to regular updates,
ensuring citizens are aware of progress and countering public misconception/negativity about
unspent funds (as seen in Buford County).
IV . Financial and Collection Report
1.Financial Report (Mr. Skinner):
◦ Old Penny Tax (2016): The total accumulated funds currently in the bank are $28,729,516.89.
▪ While the county collected more previously (around $30 million), this figure reflects
current available cash.
▪ Approximately $17 million is still obligated for ongoing projects, including about $7
million for the Exit 21 project, and remaining funds for Exit 3.
▪ This leaves an estimated $11 to $12 million in unobligated funds that can be utilized.
◦ New Penny Tax (Current): The first quarterly deposit (covering May and June) totaled
$830,023.91.
◦ Financial Planning: County staff confirmed a meeting is scheduled for August 28th with bond
counsel and the financial advisor, potentially including the ICE folks, to discuss bonding and
availability, anticipating a key decision in the fall (within the next 60 days).
V . Administrative and Future Meetings
1.Staff Administration: Mr. Fulghum reported that staff will take steps to proceed once the contract is
approved by County Council (after September 2nd). The ordinance for the Green Belt portion is delayed
and will likely surface for first reading on September 15th.
2.Meeting Frequency: Staff anticipate needing monthly meetings with the Committee for the first six to
nine months to regularly review progress and processes as they are being established.
3.Next Meeting Date: Due to a lack of immediate updates following the September 2nd council meeting,
the Committee agreed to skip September.
◦ Action Item: The next meeting was set for October 17th at 10 a.m. in Ridgeland.
VI. Adjournment
The meeting was adjourned following a motion and second.
Source: Jasper County website. First collected Oct 17, 2026.