Planning Commission Meeting — Agenda Packet
Town of Hilton Head Island · Beaufort County · Planning Commission · meeting of Mar 18, 2026 · Agenda packets
Open the original document More from Town of Hilton Head Island
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Town of Hilton Head Island
Planning Commission Meeting
Wednesday, March 18, 2026, 2:00 PM
1 Town Center Court, Hilton Head Island, SC
Benjamin M. Racusin Council Chambers
The meeting can be viewed on the Town’s YouTube Channel, the Beaufort County
Channel, and Spectrum Channel 1304.
1. Call to Order
2. Pledge to the Flag
3. Adoption of the Agenda
4. Approval of the Minutes
a. Regular Meeting Minutes of January 21, 2026.
5. Unfinished Business
a. LMO Text Amendment: Public Hearing for consideration of an Ordinance to
Amend Title 16 of the Municipal Code of the Town of Hilton Head Island, the
Land Management Ordinance, to amend the Overlay Zoning District Standards
for the Holiday Homes Neighborhood Character Overlay District (HH-NC-O), to
include the following section: 16-3-106.J.
6. New Business
a. PPR-000069-2026: Public Hearing request from Stephen Barnes, Senior
Project Manager, Town of Hilton Head Island, on behalf of the Town of Hilton
Head Island, for an Application for Public Project Review for the property
identified on Beaufort County Tax Map as Parcel R510 007 000 0228 0000,
also identified as the United States Postal Service site, located at 213 William
Hilton Parkway. The parcel is located within the Light Commercial and Corridor
Overlay Zoning Districts.
b. DPR-000073-2026: Public hearing request from Matthew Johnson of Bohler
Engineering, to redevelop the existing Truist Bank located at 2 Lafayette
Place, also identified as Beaufort County Tax Map Parcel Number R510 008
000 0409 0000. The parcel is in the Main Street Zoning District and is in the
Corridor Overlay Zoning District. The applicant proposes retrofitting the
building for a new tenant and improving the parking lot to meet ADA
Page 1 of 34
requirements.
7. Public Comment - Non Agenda Items
8. Commission Business
9. Chairman's Report
10. Staff Reports
11. Adjournment
FOIA Compliance: Public notification of this meeting has been published, posted, and
distributed in compliance with the South Carolina Freedom of Information Act and the
requirements of the Town of Hilton Head Island.
In accordance with the requirements of Title II of the Americans with Disabilities Act of
1990 ("ADA"), the Town of Hilton Head Island will not discriminate against qualified
individuals with disabilities on the basis of disability in its services, programs, or
activities. Auditory accommodations are available. Any person requiring further
accommodation should contact the Town of Hilton Head Island ADA Coordinator as
soon as possible but no later than 48 hours before the scheduled event.
Municipal Association of South Carolina (MASC) Civility Pledge:
“I pledge to build a stronger and more prosperous community by advocating for civil
engagement, respecting others and their viewpoints, and finding solutions for the
betterment of my city or town.”
Page 2 of 34
Town of Hilton Head Island Planning Commission
Meeting Minutes
1/21/2026 Page | 1
Town of Hilton Head Island
PLANNING COMMISSION MEETING
Wednesday, January 21, 2026, 2:00 PM
Minutes
1. Call to Order
Chair Henz called the meeting to order at 2:00 p.m.
In attendance: Chair Henz, Vice-Chair Whaley, Commissioners Lobaugh, Hewitt, Turnbull,
Redman, DuBois and Cordes.
2. Pledge to the Flag
3. Adoption of the Agenda
Commissioner Hewitt made a motion to adopt the agenda. Commissioner Redman seconded.
The motion was passed unanimously. 9-0.
4. Approval of the Minutes
a. Regular Meeting Minutes of December 17, 2025.
Commissioner Hewitt made a motion to adopt the minutes of December 17, 2025.
Commissioner DuBois seconded the motion. The motion passed unanimously, 9-0.
5. Unfinished Business
6. New Business
a. Request for Planning Commission Initiation of an Amendment to Title 16 of the
Municipal Code, the Land Management Ordinance, to amend section 16-3-106
Holiday Homes Neighborhood Character Overlay District (HH-NC-O) to Modify and
Add Regulations Pertaining to Setback, Buffers, Impervious Coverage, Floor Area
Ration, and Parking.
Shea Farrar, Principal Planner, and Trey Lowe, Development Services Manger,
presented the request for the initiation of an amendment to Title 16 of the Municipal
Code, the Land Management Ordinance, to amend Section16-3-106, Holiday Homes
Neighborhood Character Overlay District. Chair Henz invited public comment regarding
the item. Several citizens spoke to support the amendment and shared a printed
presentation with the Board. Staff answered questions from the Board. Trey Lowe
clarified next steps and a functional timeline for adoption of new amendments. Vice Chair
Whaley made a motion to proceed with the initiation as presented. Commissioner
Lobaugh seconded. The motion passed unanimously, 8-0.
7. Public Comment - Non Agenda Items
Page 3 of 34
Town of Hilton Head Island Planning Commission
Meeting Minutes
1/21/2026 Page | 2
8. Commission Business
9. Chairman's Report
Chairman Henz shared that he had been appointed to represent the Commission on the Land
Management Ordinance Task Force and asked that any questions or comments go to him.
Michelle Mealer, Community Planning Manager, introduced the new Town website and how to
navigate to access the Land Management Ordinance Task Force meetings, materials,
resources and presentations.
Shea Farrar provided an update on the District Planning Project.
10. Staff Reports
11. Adjournment
The meeting was adjourned at 2:51 p.m.
The full recording and a transcript of this meeting can be found on the Town’s website
at www.hiltonheadislandsc.gov
Page 4 of 34
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TOWN OF HILTON HEAD ISLAND
Planning Commission
TO: Planning Commission
FROM: Trey Lowe, Interim Planning Director, Interim LMO Official, and
Development Services Program Manager
CC: Ben Brown, Interim Deputy Town Manager and Director of Strategic
Initiatives
Marc Orlando, ICMA-CM, Town Manager
DATE: March 18, 2026
SUBJECT: Consideration of an Ordinance to Amend Title 16 of the Municipal
Code of the Town of Hilton Head Island, the Land Management
Ordinance, to amend the Overlay Zoning District Standards for the
Holiday Homes Neighborhood Character Overlay District (HH-NC-
O), to include the following section: 16-3-106.J
RECOMMENDATION:
Planning Commission hold a public hearing to review and consider an Ordinance to Amend
Title 16 of the Municipal Code of the Town of Hilton Head Island, the Land Management
Ordinance, to amend the Overlay Zoning District Standards for the Holiday Homes
Neighborhood Character Overlay District (HH-NC-O), to include the following section: 16- 3-
106.J, and forward a recommendation to Town Council.
BACKGROUND:
Properties within the Holiday Homes neighborhood are zoned Residential Single-Family-
6 Zoning District with the Holiday Homes Neighborhood Character Overlay District. The
purpose of the overlay is to provide additional zoning regulations that support the desired
character of the neighborhood. These additional regulations are related to setbacks,
buffers, impervious coverage, floor area ratio, parking, and minimum lot size.
In March and April of 2025, three building permits were submitted and approved for the
construction of new single- family homes on Oleander Street in the Holiday Homes
neighborhood. Each home complies with the standards of the Residential Single-Family-
6 Zoning District and the Holiday Homes Neighborhood Character Overlay District.
Multiple residents of the neighborhood have expressed concerns with the effectiveness
of the overlay to provide development outcomes that reflect the character of the
neighborhood. As a result, neighborhood residents requested the Town amend the
Holiday Homes Neighborhood Character Overlay District.
Page 5 of 34
Page 2 of 5
On December 15, 2025, the Community Development and Public Services (CDPS)
Committee held a public meeting at which Town staff, along with members of the Holiday
Homes community, held a discussion with the CDPS Committee seeking direction and
support of a request for the Planning Commission to initiate an Amendment to Title 16 of
the Municipal Code, the Land Management Ordinance, to amend section 16- 3-106.J,
Holiday Homes Neighborhood Character Overlay District (HH -NC-O), and the CDPS
voted unanimously to direct staff to move the text amendment forward to the Planning
Commission for their consideration.
On January 21, 2026, the Planning Commission held a public hearing at which Town staff,
along with members of the Holiday Homes community, presented a r equest for the
Planning Commission to initiate an Amendment to Title 16 of the Municipal Code, the
Land Management Ordinance, to amend section 16- 3-106.J, Holiday Homes
Neighborhood Character Overlay District (HH -NC-O), and the Planning Commission
voted unanimously to initiate the text amendment.
SUMMARY OF AMENDMENT:
Holiday Homes neighborhood residents have requested proposed zoning amendments
that more closely align with existing protective private covenants for the neighborhood that
were shared with the Town on June 12, 2025. Among other items, these protective
covenants, adopted in 1957, require homes to be single-family detached homes, not more
than 2-1/2 stories in height, and garages shall not be for more than two cars.
However,
these covenants do not establish a property owners association for enforcement. As a
result, enforcement is left to each individual property owner.
The following table summarizes the current requirements of the Holiday Homes
Neighborhood Character Overlay compared to the proposed resident requested
amendments.
Code Requirement
Current
Resident
Proposal
Change
Proposed
Setbacks
Rear
Side
Side Angles
Street
Folly Field Road
10 ft
10 fta,b
20 ftc / 65 Degrees
20 ftd
20 ft
10 ft
10 fta
20 ftc / 65 Degrees
20 ftd
20 ft
No
Yes
No
No
No
Buffers
Street
Driveway Width (Total)
Folly Field Road
20d
24 ft
20 ft
20d
22 ft
20 ft
No
Yes
No
Max Impervious Coverage 50% 45% Yes
Floor Area Ratio (FAR) 0.45 0.45 No
Max Gross Floor Area (GFA) 4,000 sq fte,f,g 3,200 sq fte,g Yes
Page 6 of 34
Page 3 of 5
Parking
First 2,000 sq ft GFA
Each Additional 1,000 sq ft GFA
Garage Parking
2 spaces
1 space
n/a
2 spaces
1 space
Max 2 spaces
No
No
Yes
Min Lot Size 7,260 sq fth 7,260 sq fth No
Max Height 35 feeti 30 feet Yes
Max Stories n/a 2-1/2 stories Yes
a. May be reduced to 5 feet to preserve trees, sum must total 20 feet.
b. A lot with less than 50 feet of street frontage or less than 0.15 acres in area shall be permitted to
reduce side yard setbacks to a minimum of 5 feet.
c. Measured 20 feet above 13 feet above mean sea level using the NAVD 88 vertical datum or pre-
development grade, whichever is higher, at the setback line
d. In the case of a corner lot, the required 20 feet adjacent street setback may be reduced to 10 feet for
the street with the lower average daily trips (ADT)
e. The gross floor area shall be calculated as all enclosed space with a ceiling height of seven feet or
greater with the exclusions noted in f and g.
f. Enclosed areas, where the floor level is located below the required base flood elevation (BFE), which
are used solely for parking or storage are excluded from gross floor area.
g. Attic space as defined by the latest adopted edition of the IBC are excluded from gross floor area.
h. For the subdivision or recombination of any lot shown on a plat recorded prior to July 21, 1998.
i. Established in the RSF-6 Zoning District.
As requested, these amendments attempt to provide new and more restrictive land
management regulations to better control the mass and scale of homes in accordance
with the protective covenants. It is important to note that reductions in requirements, such
as those proposed by this request, can result in existing homes not being compliant and
becoming non-conforming to the regulations. Town staff have preliminarily identified the
following impacts that may result from the proposed amendment.
1. Side Setback. No lots have less than 50 feet of street frontage or less than 0.15
acres of area. As a result, there would be no impact from the removal of this
exception.
2. Driveway Buffer Width . Town staff have attempted to measure driveway buffer
widths using aerial images. While this effort is significantly limited by tree canopy
coverage limits, there is at least one driveway that will become non-conforming by
the reduction in driveway buffer width.
3. Impervious Coverage. Based on available GIS data, there are approximately 14
properties that do not comply with the current 50% maximum impervious coverage
amount. Reducing maximum impervious coverage to 45%, increases non -
conforming properties to 21.
4. Floor Area Ratio . Currently all homes meet the floor area ratio. The proposed
amendment would eliminate the exclusion of enclosed areas located below the
base flood elevation used for parking or storage from the gross floor area
calculation. If applicable, this change would increase the floor area ratio potentially
making the home non- compliant. Given the age of the neighborhood, permit and
elevation data are not available for many homes. However, based on GIS data,
Page 7 of 34
Page 4 of 5
nearly all homes within the neighborhood appear to be below the base flood
elevation, 13 feet mean sea level. This amendment could result in some homes
becoming non-compliant with the floor area ratio.
5. Maximum Gross Floor Area . Currently all homes meet the maximum gross floor
area ratio. According to County Assessor and building permit gross floor area data,
the reduction of the maximum area from 4,000 to 3,200 would result in at least one
home becoming non-compliant. The removal of the exclusion for enclosed areas
located below the base flood elevation used for parking or storage would result in
approximately 7 homes becoming non-compliant. Further, those homes with areas
near the 3,200 square feet threshold would be limited in their ability to expand in
the future.
6. Garage Parking. Although this is a private covenant restriction, this would be a
new zoning requirement. Establishing a maximum number of 2 garage spaces
would result in at least 3 homes becoming non-compliant.
7. Maximum Building Height. Based on available data, all homes appear to meet the
maximum height requirement of 35 feet. However, it appears at least 6 homes will
become non-compliant if the maximum building height were reduced to 30 feet.
8. Maximum Number of Stories . Although this is a private covenant restriction, this
would be a new zoning requirement. Establishing a maximum number of 2- 1/2
stories would result in 6 homes becoming non-compliant.
Any amendment to the Holiday Homes Neighborhood Character Overlay will apply to all
lots in the neighborhood. The residents that have been in contact with Town Staff have
coordinated with other property owners in the neighborhood. T hese residents have
worked to communicate these changes to all 57 property owners, and they have collected
signatures of support for the currently proposed amendments that include a majority
(currently 42) of the property owners.
PLANNING COMMISSION ACTION:
LMO Sec.16-2-103-B.2.d states that the Planning Commission's recommendation shall be
based on the standards in Sec. 16- 2-103.B.3, Ordinance Text Amendment Review
Standards.
The Planning Commission has the following options when considering this agenda item.
These include:
1. Recommend approval to Town Council.
2. Recommend denial to Town Council.
3. Recommend approval with conditions to Town Council.
ATTACHMENTS:
1. Holiday Homes Neighborhood Location Map
2. Land Management Ordinance Section 16- 3-106.J. Holiday Homes Neighborhood
Character Overlay (HH-NC-O) District
3. Holiday Homes Protective Covenants
Page 8 of 34
Page 5 of 5
4. Neighborhood Character Images
5. HH-NC-O District Proposed Amendment
Page 9 of 34
··---·-·------·el..-...
Town ofHilton Head Island
Holiday Homes Neighborhood Character Overlay
14 34
12 32 1012 11
9
9 10
10 7 8 7
7 10
8 7
5 6 5
5 5 8
6 6 3
4 3 4
3 3
4 4 1
1 2
1
1 2
Page 10 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 1 of 3
Sec.16-3-106. Overlay Zoning Districts
J. Holiday Homes Neighborhood Character Overlay (HH-NC-O) District
1. Applicability and Purpose
The purpose of the Holiday Homes Neighborhood Character Overlay (HH -NC-O) District is to protect
the single-family residential character of the district and in particular the development and
redevelopment of lots within the district. All new development and changes to existing development
are subject to the overlay district regulations, in addition to those listed in Sec. 16 -3-104.D, Residential
Single-Family-6 (RSF-6) District. Existing nonconforming structures and site features may be expanded
as long as the site complies with the required floor area ratio (FAR) and maximum impervious cover
listed in paragraph 3 below.
2. Approval
Compliance with these regulations shall be determined by the Official at the time the Building Permit
is reviewed and shall be based upon the standards of Sec. 16-3-104.D, Residential Single-Family-6 (RSF-
6) District.
3. Delineation of District
The Holiday Homes Neighborhood Character Overlay (HH-NC-O) District includes all parcels shown as
hatched in Figure 16-3-106.J.3 below.
Figure 16-3-106.J.3: Holiday Homes Neighborhood Character Overlay (HH -NC-O) District.
Page 11 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 2 of 3
4. District Regulations
a. Setbacks
In addition to the single-family setback requirements of Sec. 16-5-102, Setback Standards, the
following setbacks shall be required:
i. Rear yard setbacks shall be a minimum of ten feet.
ii. Side yard setbacks shall be a minimum of ten feet; however, to preserve existing trees, any
one side yard setback may be reduced to five feet provided the sum of the required side
yard setbacks equals at least 20 feet.
01.A lot with less than 50 feet of street frontage or less than 0.15 acres in area shall
be permitted to reduce side yard setbacks to a minimum of five feet.
02.Dwelling units that are nonconforming as to the side yard setbacks identified
above are permitted to be expanded along the subject boundary line; however,
expansions shall be constructed no closer than five feet from the side property
line.
03.Side yard setback angles shall be a minimum of 65 degrees measured from 20 feet
above thirteen feet (13') above mean sea level using the NAVD 88 vertical
datum or pre-development grade, whichever is higher, at the setback line. The
illustration in Sec. 16-5-102.D, Adjacent Use Setback Requirements, can be
referenced for an example of a setback angle.
iii. In the case of a corner lot, the required 20-foot adjacent street setback may be reduced to
ten feet for the street with the lower average daily trips (ADT).
iv. Lots directly adjacent to Folly Field Road shall have a minimum adjacent street setback of
20 feet.
(Revised 3-7-2023 - Ordinance 2023-04)
b. Buffers
In addition to the buffer requirements of Sec. 16-5-103, Buffer Standards,the following buffers
shall be required:
i. A 20-foot street buffer and side and rear buffers equal to the setbacks above.
ii. Driveways for street access, as permitted in Sec. 16-5-103.J, Development Within Required
Buffers,shall be limited to a total width of 24 feet per lot.
iii. In the case of a corner lot, the required 20-foot adjacent street buffer may be reduced to
ten feet for the street with the lower average daily trips (ADT).
iv. Lots directly adjacent to Folly Field Road shall have a minimum adjacent street buffer of 20
feet.
c. Impervious Coverage
Impervious cover of the lot shall not exceed 50 percent.
Page 12 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 3 of 3
d. Floor Area Ratio
The maximum gross floor area is limited to 0.45 times the area of the lot containing the single-
family dwelling, up to a maximum of 4,000 square feet. The gross floor area shall be calculated
as all enclosed space with a ceiling height of seven feet or greater with the following exclusions:
i. Enclosed areas, where the floor level is located below the required base flood elevation
(BFE), which are used solely for parking or storage.
ii. Attic space as defined by the latest adopted edition of the IBC.
e. Parking
Two parking spaces are required for up to 2,000 square feet of gross floor area. Thereafter, one
additional space shall be required for each 1,000 square feet or less of gross floor area.
f. Minimum Lot Size
The subdivision or recombination of any lot shown on a plat recorded prior to July 21, 1998, shall
not result in any lot having a gross area of less than 7,260 square feet.
Page 13 of 34
259
Deputy Clerk of Court.
Deputy Clerk of Court.
J. J.MCNULTA, JR.) STATE OE, SOUTH CAROLINA) COUNTY OF BEAUFORT) For value received, I, the undersigned, J. J. T"TO: ASSIGNMENT ) MCNULTA, JR. of the County of Beaufort and State of South Carolina, do hereby assign, set overJ. J. MCNULTA, SR.) and transfer unto J. J. MCNULTA, SR. all my right, title and interest in and to that certainagreement executed and entered into by and between Loinel M. Henkle, J. J. McNulta dnthe undersigned J. J. McNulta, Jr ,which said agreement was dated May 20, 1952 and transferred to the undersigned and J. J. McNulta, Sr. all the right,title and interest of the said Loinel M. Henkle in and to his Contract of Sale between F. M. Craddock and his wife, Dor sH. Craddock of Fairfax, South Carolina and Harry E. Carr and his wife, Gladys H. Carr, of Beaufort County, South Caroli a,which said original Contract was dated July 6, 1949 and provided for the sale to Lionel M. Henkle his heirs and assignsof a tract of land containing 658.7 acres, more or less loacted in Beaufort County, South Carolina.IN WITNESS WHEREOF, I have executed this instrument this 31st day of December, 1956. J. J. McNulta, Jr. Witnesses:G. G. Dowling Kathrine • Wilson
STATE OF SOUTH CAROLINA) COUNTY OF BEAUFORT) PERSONALLY Appeared before me Kathrine W. Wilson and made oath thatshe saw the within named J.,J. McNulta, Jr., sign, seal and as his act and deed, deliver the within written Assignmentand that she with G. G. Doling witnessed the execution thereof. Kathrine W. Wilson SWORN to before me this 31stday of December, 1956. G. G. Dowling (L.S.) Notary Public for South Carolina.Recorded and certified this 30th day of January, 1957. .::J,
t',..f'r
HOLIDAY HOMES ) STATE OF SOUTH CAROLIAA) COUNTY OF BEAUFORT) WHEREAS, Holiday Homes is a corporationTO: PROTECTIVE COVENANTS) orgainized and existing under the laws of the State of South Carolina and is the owner of
) certain lands located on Hilton Head Island in Beaufort County, South Carolina, and
WHEREAS, heretofore by an instrument dated April 5, 1956 and recorded in the office of the Clerk of Court for Beaufort
County, South Carolina·in Deed Book 78 at page 325, Block l of Section A of a subdivision on Hilton Head Island in Beau
gort County, South Carolina, known as Holiday Homes Subdivision, was made subject to certain protective covenants andit6cisvnow the desire of Holiday Homes to make the remaining portion of said section A of Holiday Homes Subdivision sub
ject to the same restrictions and protective covenants., NOW THEREFORE, Holiday Homes, a corporation as aforesaid, doe
hereby declare that all of Section A of a subdivision on Hilton Head Island in Beaufort County, South Carolina known as
Holiday Homes Subdivision as shown on a plat recorded in the office of the Clerk of Court for Beaufort County, South
Carolina on March 5, 1956 in Plat Book 10 at page 18, shall be subject to the following restrictions and protective
covenants, to-wit: In'addition to lots .l, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12, 13, 14 and 15 which are included in Block
l of Section A fe£erred to above, the remaining numbered lots in said Section A numbered l6' through 45 inclusive and
52 through 63 inclusive shall be sgbject to the followigg restrictions and protective covenants. 'l..All lots'in said subdivision shall be used for residential purposes exclusively. No structure shall be erected,altered, placed or permitted to remain on any lot, other than (l) detached single family dwelling not to exceed two and
one half (2) stories in height and a privated garage for not more than two cars (which may include servant' quarters)and otheryoutbuildings incident to the use of one single family unit.2. No building. shall be erected, placed or altered on any lot in this subdivision until the building plans, specifications, and plot plan showing the location of such building, have been approved in writing by HOLIDAY HOMES, its agents,
seccuessors, or assigns.3. No. building shall be located on any lot nearer than twenty (20) feet to the front line, nor nearer than ten (10)feet to any side streetline, nor nearer than (5) feet.to any lot line.4. No dwelling shall be permitted on any lot which structure shall have less than seven hundred fifty (750) feet of
permanently enclosed space, exclusive of gargges. .' :'. ·S.,5. HOLIDAY HOMES heteby reserves unto itself,its successors and assigns,,a perpetual, alienable and reteasable easement and right on, over and under the ground to erect, maintain and use electric and telephone poles, wires, cables,
conduits,.sewers, water mains, and'other suitable quipment for the conveyance and use of electricity, telephone, gas,
sewage, water or other public conveniences or utilities on, in, or over the rear five (5) feet of each lot and five' (5)feet along one (d) side of said lots.6. Prior to the occupancy of a residence on any lot in said subdivision, propertand suitable septic tank, or tanks,shall be constructed on such lot for the disposal of all sewage, and all sewage shall be emptied or discharged into :suc+
tank; or tanks:' ·l
No noxious of offensive activity shall be carried on upon any lot, nor shall anything be done therein which may be or
may 'become an annoyance or nuisance to the neighborhood.
8No .livestock or live fowl shall be·maintained on any lot without written consent of HOLIDAY HOMES, its successors
or assigns.'.9. No struture of a temporary character, trailer, basement, tent, shack, gargge, barn or other outbuilding shall be
used on 'any lot at ahy time as a residence either temporarily or permanently. .. '
10. No lot shall be subdivided, or its boundary lines changed except with the written consent of HOLIDAY HOMES, its• successors or assigns, '
However, HOLIDAY HOMES 'hereby expressly reserves to itself, its successors and assigns, the'right to subdivide (by deed or otherwise) or replat any two (2} or more lots shown. on theplat'of said subdivision so
as to create building plot or building plots each larger in size than any one of the lots so subdivided or replatted.·When' such'a building plot is created, the restrictions and covenants herein apply. to such building plot as a unit,and as to such building plot'as a unit, and as to such building plot the word 'ot" as used herein, shall be construed·to mean "building plot". ..'·· -.'. ·
11.'These covenants'shall run with the 1and and sna11e binging on all parties, and persons claiming under them for aperiod of twenty-five (25) years from date after which time said covenants shall be automatically extended for succes
: sive 'periods 'of ten (d0} years, unless an instrument signed by a majority of the then ownes of said lots has been re
'corded, agreeing to'change said covenants and restrfictions 'in whole or in part., 12. If the parties·hereto, or any/of them or th@it heirs, successors or assigns, shall violate or'attempt to violate
any of the; covenants herein, it shall be lawful for any other person or persons woning any real properyy situate insaid subdivision to prosecute any lawful proceedings at law or in equity against the person or persons violating or..attempting to vilite any such covenant and either to prevent him or them from dojng so or to re cover damages or·otherdues for such violation. ' •
13. Invalidation of any;of these covenants by judgment or court order shall in no wise affect any of the otherpovisio s
which sball remain' in full force and effect.1&. HOLIDAY HOMES May include in:any contaract or deed hereafter amde additional conenants and restrictions that are no
inconsistent ith and which do not'lower the standards of the covenants and restrictions set'forth herein. >
IN WITNESS WHEREOF this instrument has been executed on behalf of HOLIDAY HOMES, a corporatinn, by its duly qualifiedofficers this 23rd day of January, 1957. HOLIDAY HOMES (SEAL) By O.T. McIntosh, Jr., President Attest: W. S.
McIntosh' Witnesses: Jas. F. McIntosh Betty H. Armout.
STATE, OF SOUTH CAROLINA) COUNTY OF BEAUFORT) PERSONALLY appeared before me James F. McIntosh who, on oath, says 'thathe 'saw the within named HOLIDAY HOMES by O. T. McIntosh, Jr., its President sign the within Instrument, and W. S. McInt sh
its Secretary attest the'same, and the said corporation, by said officers, seal said instrument, and, as its act and
deed, deliver the same, and that he with Betty H. Armour witnessed the execution thereof. Jas. F. McIntosh
SWORN to before'me this'23rd day of January, 1957. (SEAL) Betty H. Armour (L.S.) Notary Public for Chatham County, G .
My Commission Expires Sept. 28, 1959.
Recorded and certified this 28th day of January, 1957.
¥
1
3
Page 14 of 34
Examples of Existing Homes in
Holiday Homes Neighborhood
Page 15 of 34
New Homes Under Construction in
Holiday Homes Neighborhood
Page 16 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 1 of 4
Sec.16-3-106. Overlay Zoning Districts
J. Holiday Homes Neighborhood Character Overlay (HH-NC-O) District
1. Applicability and Purpose
The purpose of the Holiday Homes Neighborhood Character Overlay (HH -NC-O) District is to protect
the single-family residential character of the district and in particular the development and
redevelopment of lots within the district The purpose of the Holiday Homes Neighborhood Character
Overlay (HH-NC-O) District is to protect and preserve the single-family residential character of the
neighborhood. The district is intended to guide the development and redevelopment of lots in a
manner that maintains and enhances the area’s architectural character and development intensity. All
new development and changes to existing development are subject to the overlay district regulations,
in addition to those listed in Sec. 16-3-104.D, Residential Single-Family-6 (RSF-6) District.
Notwithstanding the requirements of Sec. 16-7-103 A, Eexisting nonconforming structures and site
features may be expanded as long as the site complies with the required floor area ratio (FAR) and
maximum impervious cover listed in paragraph 3 below, and if the expanded component of the
structure is compliant with Sec. 16-3-104.D and all requirements of Sec. 16-3-106 J.
2. Approval
Compliance with these regulations shall be determined by the Official at the time the Building Permit
is reviewed and shall be based upon the standards of Sec. 16-3-104.D, Residential Single-Family-6 (RSF-
6) District.
3. Delineation of District
The Holiday Homes Neighborhood Character Overlay (HH-NC-O) District includes all parcels shown as
hatched in Figure 16-3-106.J.3 below.
Page 17 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 2 of 4
Figure 16-3-106.J.3: Holiday Homes Neighborhood Character Overlay (HH -NC-O) District.
4. District Regulations
a. Setbacks
In addition to the single-family setback requirements of Sec. 16-5-102, Setback Standards, the
following setbacks shall be required:
i. Rear yard setbacks shall be a minimum of ten feet.
ii. Side yard setbacks shall be a minimum of ten feet; however, to preserve existing trees, any
one side yard setback may be reduced to five feet provided the sum of the required side
yard setbacks equals at least 20 feet.
01.A lot with less than 50 feet of street frontage or less than 0.15 acres in area shall
be permitted to reduce side yard setbacks to a minimum of five feet.
021.Dwelling units that are nonconforming as to the side yard setbacks identified
above are permitted to be expanded along the subject boundary line; however,
expansions shall be constructed no closer than five feet from the side property
line.
032.Side yard setback angles shall apply to all side yards and be a minimum of 65
degrees measured from 20 feet above thirteen feet (13') above mean sea level
using the NAVD 88 vertical datum or pre-development grade, whichever is
higher, at the setback line. The illustration in Sec. 16-5-102.D, Adjacent Use
Setback Requirements, can be referenced for an example of a setback angle.
Page 18 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 3 of 4
iii. In the case of a corner lot, the required 20-foot adjacent street setback may be reduced to
ten feet for the street with the lower average daily trips (ADT).
iv. Lots directly adjacent to Folly Field Road shall have a minimum adjacent street setback of
20 feet.
(Revised 3-7-2023 - Ordinance 2023-04)
b. Buffers
In addition to the buffer requirements of Sec. 16-5-103, Buffer Standards, the following buffers
shall be required:
i. A 20-foot street buffer and side and rear buffers equal to the setbacks above.
ii. Driveways for street access, as permitted in Sec. 16-5-103.J, Development Within Required
Buffers, shall be limited to a total width of 2422 feet per lot. Horseshoe driveways with two
connecting driveways for street access from the same lot shall be limited to a total width of
22 feet within required buffers.
iii. In the case of a corner lot, the required 20-foot adjacent street buffer may be reduced to
ten feet for the street with the lower average daily trips (ADT).
iv. Lots directly adjacent to Folly Field Road shall have a minimum adjacent street buffer of 20
feet.
c. Impervious Coverage
Impervious cover of the lot shall not exceed 4550 percent.
d. Floor Area Ratio
The maximum gross floor area is limited to 0.45 times the area of the lot containing the single-
family dwelling, up to a maximum of 4,0003,200 square feet. The gross floor area shall be
calculated as all enclosed space with a ceiling height of seven feet or greater with the following
exclusions:excluding
i. Enclosed areas, where the floor level is located below the required base flood elevation
(BFE), which are used solely for parking or storage.
ii. Aattic space as defined by the latest adopted edition of the IBC.
e. Parking
Two parking spaces are required for up to 2,000 square feet of gross floor area. Thereafter, one
additional space shall be required for each 1,000 square feet or less of gross floor area. Garages
shall not be used for more than two cars.
f. Minimum Lot Size
The subdivision or recombination of any lot shown on a plat recorded prior to July 21, 1998, shall
not result in any lot having a gross area of less than 7,260 square feet.
g. Maximum Height and Stories
i. Structures shall not exceed 30 feet in height in accordance with Sec. 16-10-102 C.1.
Page 19 of 34
Created: 2024-07-16 16:10:52 [EST]
(Supp. No. 9)
Page 4 of 4
ii. Buildings shall not exceed two and one-half (2-1/2) stories in height. For the purpose of
this section, a story is the portion of the building included between the surface of any floor and
the surface of the floor next above it, or if there is no floor above it, then the space between the
floor and the ceiling next above it. The topmost story of a building is counted as a half story
when it is completely within the roof form of the building, less than 50 percent of the floor area
has a clear height of more than seven and a half (7.5) feet, measured from the finished floor to
the finished ceiling, and dormers do not exceed more than 25 percent of the front, rear or side
building length.
Page 20 of 34
1
TOWN OF HILTON HEAD ISLAND
COMMUNITY DEVELOPMENT DEPARTMENT
One Town Center Court, Hilton Head Island, SC 29928 843-341-4757 FAX 843-842-8908
STAFF REPORT
PUBLIC PROJECT REVIEW
Case # Project Name Public Hearing Date
PPR-000069-2026 USPS Access Improvements March 18, 2026
Project Location Applicant
213 William Hilton Parkway
Hilton Head Island, SC 29926
Parcel: R510 007 000 0228 0000
Stephen Barnes, Senior Project Manager
Town of Hilton Head Island
1 Town Center Court
Hilton Head Island, SC 29928
Application Summary
Application Summary Application for a Public Project Review (PPR) from the Town of Hilton Head
Island for access, circulation, parking, pedestrian, and stormwater improvements at the United States
Postal Service (USPS) facility located at 213 William Hilton Parkway. The project includes
reconfiguration of existing driveway connections and parking areas, installation of enhanced
pedestrian facilities, stormwater infrastructure improvements, and related site enhancements intended
to improve traffic flow, access management, safety, and pedestrian connectivity. The total number of
parking spaces will remain unchanged, and access to the post office will be maintained throughout
construction.
Staff Recommendation
Staff recommends the Planning Commission find this application to be consistent with the Town’s
Comprehensive Plan for location, character, and extent based on those Findings of Fact and
Conclusions of Law as determined by the LMO Official and enclosed herein.
Background
The Town of Hilton Head Island has submitted a Public Project Review application for access and
circulation improvements at the United States Postal Service facility located at 213 William Hilton
Parkway (Parcel R510 007 000 0228 0000). The project site is located along U.S. Highway 278, a
primary arterial roadway on Hilton Head Island, and is bounded by Marsh Point Apartments to the
north and Northpoint Circle to the west. The property is zoned Light Commercial (LC) and is located
within the Corridor Overlay District.
The proposed project focuses on improving existing site access, internal circulation, pedestrian
accommodations, and stormwater management at the USPS facility. Improvements include removal
and reconfiguration of existing driveway connections, parking lot reconfiguration, installation of
sidewalks and a shared-use path, updated lighting and signage, and stormwater infrastructure
Page 21 of 34
2
improvements. The United States Postal Service has provided conditional approval for the
conveyance of approximately 1.82 acres of property to the Town for right-of-way purposes associated
with the project.
The improvements are coordinated with the Northpoint Circle roadway project and the adjacent
Northpoint Workforce Housing development. In addition, staff coordinated with the adjacent Marsh
Point Apartments property management team on Feb. 2, 2026, regarding both the Northpoint
Workforce Housing development and the proposed USPS access improvements. A meeting was held
with property management to discuss roadway ownership, secondary access via Marsh Point Drive,
construction access, traffic circulation, and related coordination items. Staff provided updated site
information and responded to follow-up questions regarding maintenance responsibilities and
connectivity. Public hearing information for the March 18, 2026 Planning Commission meeting was
subsequently shared with property management for distribution to residents.
Construction is anticipated to begin in March 2026 and will be phased to ensure continuous USPS
operations and public access throughout construction.
Description of Project
The Town of Hilton Head Island proposes to improve access and circulation at the USPS site
through removal and replacement of existing driveways and reconfiguration of on-site parking areas
along Marsh Point Drive and U.S. Highway 278. A new 22-foot-wide access driveway is proposed,
along with reconfigured 24-foot-wide asphalt drive aisles, curb and gutter, pavement markings,
signage, lighting, and storm drainage infrastructure. A 12-foot-wide pervious asphalt shared-use path
is proposed adjacent to the access drive to enhance pedestrian and multimodal connectivity.
Additional improvements include replacement of sidewalks at the front of the USPS building,
relocation of the post office drop box to improve internal circulation and pedestrian access, and direct
pedestrian connections between the building, parking areas, and site amenities. The existing parking
count of 45 spaces, including two ADA-accessible spaces, will be maintained.
Location, Character, and Extent
Per Land Management Ordinance Section 16-2-103.Q.4, Public Project Review Standards, in
determining whether a proposed public project is compatible with the Comprehensive Plan, the
Planning Commission shall consider whether the location, character, and extent of the proposed
development is consistent with, or conflicts with, the plan’s goals and implementation strategies.
Summary of Facts and Conclusions of Law
Findings of Fact:
1. LMO Appendix D-24, Application Deadlines, requires applications before the Planning
Commission to be submitted to the LMO Official 30 calendar days prior to the meeting. The
applicant submitted the application for this project on January 15, 2026.
2. LMO Section 16-2-102.E.1, Hearing Scheduling, states that when an application is subject to a
hearing, the LMO Official shall ensure that the hearing on the application is scheduled for a
regularly scheduled meeting of the body conducting the hearing or a meeting specially called
for that purpose by such body. The LMO Official scheduled the public hearing on the
application for the March 18, 2026, Planning Commission meeting, which is a regularly
scheduled meeting of the Commission.
Page 22 of 34
3
3. LMO Section 16-2-102.E.2, Hearing Notice, requires the LMO Official to publish a notice of
the public hearing in a newspaper of general circulation in the Town no less than 15 calendar
days before the hearing date. Notice of the March 18, 2026 public hearing was published in
the Island Packet on March 1, 2026, which is 17 calendar days before the hearing date.
4. LMO Section 16-2-102.E.2, Hearing Notice, requires the applicant to mail a notice of the
public hearing by first-class mail to the owner(s) of the land directly contiguous to the
proposed project no less than 15 calendar days before the hearing date. The applicant mailed
notices of the March 18, 2026, public hearing by first-class mail to such owner(s) of the land
on February 25, 2026, which is 21 calendar days before the hearing date.
Conclusions of Law:
1. The application was submitted 34 calendar days prior to the meeting date, in compliance with
LMO Appendix D-24.
2. The LMO Official scheduled the public hearing on the application for the March 18, 2026,
Planning Commission meeting, in compliance with LMO Section 16-2-102.E.1.
3. Notice of the public hearing was published 17 calendar days before the meeting date, in
compliance with LMO Section 16-2-102.E.2.
4. The applicant mailed notices of the public hearing to owner(s) of land directly contiguous to
the proposed project 21 calendar days before the hearing date, in compliance with LMO
Section 16-2-102.E.2.
Summary of Facts and Conclusions of Law
Findings of Facts:
The Comprehensive Plan (Our Plan: Hilton Head Island Comprehensive Plan 2020–2040) identifies
Infrastructure, Mobility, and Housing as interrelated Core Values that guide public investment
decisions, emphasizing roadway safety, access management, pedestrian connectivity, and coordination
of infrastructure improvements to support workforce housing and established community services.
• The project is located within an established transportation corridor along U.S. Highway 278 and
adjacent to Northpointe Circle, an area characterized by existing public infrastructure and identified
for strategic reinvestment to improve safety, access, and circulation.
• The character of the proposed improvements is functional and context-sensitive, consisting of
access management improvements, internal circulation upgrades, pedestrian facilities, and stormwater
infrastructure within an already developed site, without expanding roadway capacity or altering land
use intensity.
• The extent of the project is limited to improvements necessary to support safe vehicular and
pedestrian access, internal circulation, stormwater management, and continued operation of an
essential public facility. Parking supply is maintained, construction is phased, and improvements are
coordinated with adjacent roadway and workforce housing projects.
Project Location:
The project is located at an existing USPS facility along U.S. Highway 278, a major transportation
corridor serving Hilton Head Island. The site is already developed with public infrastructure and
Page 23 of 34
4
surrounded by established residential and commercial uses, making it an appropriate location for
access and safety improvements.
Project Character:
The proposed improvements are functional in nature and consistent with the character of
surrounding development. The project focuses on safety, access, and pedestrian connectivity without
expanding the intensity of use or altering the fundamental character of the site.
Project Extent:
The scope of work is limited to site access, circulation, and infrastructure improvements within the
existing developed footprint. Parking capacity is maintained, access to the USPS is preserved during
construction, and improvements are coordinated with surrounding infrastructure projects. The extent
of development is appropriate and proportionate to the site’s role as a public facility.
Conclusions of Law:
The Comprehensive Plan supports the location of the proposed project.
• The project is located adjacent to workforce housing and residential uses, and near public
schools.
• The location advances the Comprehensive Plan’s Infrastructure and Mobility Core Values by
directing public investment to an existing site where access, circulation, and safety
improvements are needed.
The Comprehensive Plan supports the character of the proposed project.
• The project emphasizes context-sensitive, infrastructure-focused improvements that enhance
safety, access management, pedestrian accommodation, and coordination with adjacent land
uses.
The Comprehensive Plan supports the extent of the proposed project.
• The scope of work is proportionate to its purpose and limited to improvements necessary to
support safe access, internal circulation, stormwater management, and continuous operation
of essential public services.
• The project enhances the efficiency of existing infrastructure and supports workforce housing
access without expanding the development footprint.
LMO Official Determination
The LMO Official determines this application is compatible with the Comprehensive Plan for the
location, character, and extent as based on the above Findings of Fact and Conclusions of Law.
Planning Commission Determination and Motion
Per LMO Section 16-2-103.Q.4, Public Project Review Standards, the Planning Commission’s role is to
determine whether the application is compatible or is not compatible with the Comprehensive Plan for
location, character, and extent.
Page 24 of 34
5
PREPARED BY:
MC
2/7/2026
Michael Connolly, AICP
Senior Planner
DATE
REVIEWED BY:
TL
03/09/2026
Trey Lowe
Interim Director of Planning, Interim LMO
Official, Development Services Program
Manager
DATE
APPROVED BY:
TL
03/09/2026
Trey Lowe
Interim Director of Planning, Interim LMO
Official, Development Services Program
Manager
DATE
ATTACHMENTS:
A) Applicant’s Narrative
B) Vicinity Map
C) Existing Conditions
D) Proposed Changes
Page 25 of 34
USPS ACCESS IMPROVEMENTS
TOWN OF HILTON HEAD ISLAND, SOUTH CAROLINA
PROJECT NARRATIVE
January 8, 2026
J-28374.0013
Introduction
The Town of Hilton Head Island proposed access improvements at the United States Postal Service
(USPS), located adjacent to Northpointe Circle, off U.S. Highway 278 in Hilton Head Island, South
Carolina. The project site is bound by U.S. Highway 278 to the south, Marsh Point Apartments to
the north, Northpointe Circle property to the west. The Town of Hilton Head Island is proposing to
improve an existing USPS driveway and parking lot, located at 213 William Hilton Parkway, Hilton
Head Island, SC, from Marsh Point Drive to the western most USPS property line. Proposed
improvements generally consist of removing and replacing the existing USPS parking lot and
corresponding driveways off Marsh Point Drive and U.S. 278. The USPS has provided the Town with
conditional approval of approximately 1.82 acres of USPS property to be conveyed to the Town
for the establishment of a right-of-way for the access improvements.
Proposed Improvements and Site Restoration
The proposed USPS site will include a 22’ wide access driveway from Marsh Point Drive west to the
western USPS property line. Additionally, the USPS facility parking area will be reconfigured and
consist of 24’ wide asphalt drive isles, parking spaces, curb and gutter, and corresponding
marking, signage, lighting, and storm drainage infrastructure is proposed. A 12’ wide, pervious
asphalt pathway is planned to run adjacent to the proposed access drive. The existing right-in,
right-out driveway to the USPS site from U.S. 278 is also proposed to be removed, replaced and
reconfigured to tie into proposed improvements. Stormwater runoff from proposed improvement
areas will be collected by proposed curb inlets and underground drainage pipes and conveyed
west to an existing 30” outfall pipe on the Northpointe Circle property, following the existing
drainage outfall.
At the competition of proposed improvements, the existing parking count (45 spaces, 2 of which
are ADA accessible spaces) will be maintained. The existing post office drop box is planned to be
relocated from its existing location to the center of the site, adjacent to a proposed one-way drive
isle. The existing sidewalk at the front of the USPS building is also proposed to be removed and
replaced. Direct pedestrian access from the post office building to the drop box is proposed. See
the site plans for all proposed improvements.
The construction of the USPS access improvements is scheduled to commence in March 2026.
Construction occurring on the USPS property will be scheduled concurrently with the Northpointe
Circle project. The Town will coordinate construction with USPS.
Page 26 of 34
Project Narrative
USPS Access Improvements
January 8, 2026
Page 2
The USPS has provided conditional approval of the easements needed for construction and the
acquisition of the 1.82 acre property to the Town of HHI.
USPS Continuous Access
To provide USPS customers and employees continuous access to the site during construction, the
parking area and driveways are intended to be constructed in 2 phases. While construction
phasing is a Contractor “means and method” of construction and cannot be dictated by an
engineer, a preliminary construction phasing exhibit has been provided for Contractor reference.
Page 27 of 34
TOWN (T- HR. Tc;t,J tfAD J!lA� CN:1\Jllll<tl("tlC,:U.•
ttl"'Ulf<j�l5ljJO S-'·""'
'TUll!l�l•'f'•Nt
Location Map
213 William Hilton Parkway
February 3, 2026 , .. --�, ............ � ..... -...... --�· ... ·--.............. -··--..... -... ·---.... oir•er•-•-fl"'••- •••-••••----"
.. _ .... _ ... , ..... -- .. •-· ..... -----·-_ .. , .. -
Page 28 of 34
N/F
UNITED STATES POSTAL SERVICE
N/F
1 GUMTREE LLC.
N/F
SOC MARSH POINT INC.
N/F
SOC MARSH POINT INC.
50' RIGHT-OF-WAY
150' CENTRAL ELECTRIC POWERLINE EASEMENT
50 Park of Commerce Way
Savannah, GA 31405 • 912.234.5300
www.thomasandhutton.com
BID SET - NOT FOR CONSTRUCTION
Page 29 of 34
N/F
UNITED STATES POSTAL SERVICE
N/F
TOWN OF HILTON HEAD ISLAND
POND
GUM TREE ROAD 66' R/W
N/F
1 GUMTREE LLC.
N/F
SOC MARSH POINT INC.
N/F
SOC MARSH POINT INC.
50' RIGHT-OF-WAY
150' CENTRAL ELECTRIC POWERLINE EASEMENT
SITE LAYOUT MAP
USPS ACCESS IMPROVEMENTS
HILTON HEAD ISLAND, BEAUFORT COUNTY, SC
January 15, 2026
PREPARED FOR:
This map illustrates a general plan of the development which is for discussion
purposes only, does not limit or bind the owner/developer, and is subject to change
and revision without prior written notice to the holder. Dimensions, boundaries and
position locations are for illustrative purposes only and are subject to an accurate
survey and property description.
COPYRIGHT © THOMAS & HUTTON
50 Park of Commerce Way
Savannah, GA 31405 • 912.234.5300
www.thomasandhutton.com
2026
1 INCH =
0 20
40 FEET
4040
Z:\28374\28374.0013\ENGINEERING\DRAWINGS\EXHIBITS\28374.0013 - SITE LAYOUT EXHIBIT_PPR.DWG - Feb 16, 2026 - 12:17 PM
BID SET - NOT FOR CONSTRUCTION
Page 30 of 34
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
TO: Planning Commission
FROM: Michael Connolly, Senior Planner
CC: Trey Lowe, Interim Planning Director, Interim LMO Official, and Development
Services Program Manager
DATE: March 18, 2026
SUBJECT: Development Plan Review
PURPOSE:
As part of the Town’s Development Review Program, Development Plan Review applications for
Major Development Plan Review s and Minor Development Plan Reviews adjacent to or across
the street from a residential use are shared with the Planning Commission for review in
accordance with the Land Management Ordinance. These applications are presented by Staff to
inform the Planning Commission and the general public of development activity occurring on
Hilton Head Island . There is one new D evelopment Plan Review a pplication ready to be shared
with the Planning Commission – Bank Retrofit, 2 Lafayette Place – DPR-000073-2026.
BACKGROUND:
The project proposes an interior retrofit of the existing building to accommodate a new tenant,
with no additional square footage proposed. Site improvements include reconfiguration of
existing parking spaces and pedestrian access to meet ADA requirements, removal of the existing
bank drive-thru lane and canopy, and construction of a new ATM drive -thru lane with a large
landscape island. Additional work includes milling and overlay of the majority of the existing
asphalt parking lot, along with limited full-depth asphalt removal and repaving to support grading
adjustments. The proposed site modifications will result in a net reduction of impervious surface
area on the property.
ZONING AND DEVELOPMENT DATA:
Zoning and Development Standards Summary
Zoning district Main Street (MS) District
Overlay district N/A
Use of the property Bank
Gross site acres 2.503 ac
Net site acres (gross acres-tidal wetlands) 2.503 ac
TOWN OF HILTON HEAD ISLAND
Staff Report Memo
Page 31 of 34
Stephen G. Riley Municipal Complex
One Town Center Court Hilton Head Island South Carolina 29928
www.hiltonheadislandsc.gov
Allowed total density (net acres x gfa) 4.524 ac
Maximum allowed impervious area percentage 60%
Existing building square footage 8,242 sf
Proposed building square footage 0 additional
Total square footage 8,242 sf
Maximum building height allowed 45'
Proposed building height 35' 2"
Current impervious area and percentage 1.22 ac / 48.7%
Proposed impervious area and percentage 1.16 ac / 46.3%
Minimum number of parking spaces required 1 space per 350 sf gfa (24 spaces)
Existing number of parking spaces on site 51
Proposed additional parking spaces 50 total spaces
Area of disturbance 0.53 ac
Flood zones Zone X
REVIEW AND ACTION:
Per LMO Section 16-2-103.G.4.c.ii, A Minor Development Plan Review when adjacent to or across
the street from a residential use shall be reviewed by the Planning Commission in the same
manner as a Major Development Plan Review. LMO Section 16 -2-103.G.4.d, Staff Review and
Action – Major Development Plan Review, require the following review and action criteria;
i. The Official shall forward the application to the Planning Commission for review, and
the Planning Commission shall review the application, staff report, and any public
comment at a hearing.
ii. Following review by the Planning Commission, the Official shall make a final decision
on the application in accordance with Sec. 16-2-102.D. The Official's decision shall be
based on the standards in Sec. 16 -2-103.G.5, Development Plan Review Standards,
and shall be one of the following:
01. Approve the application;
02. Approve the application subject to conditions of approval; or
03. Deny the application.
iii. The Official shall act on an application for Major Development Plan Review, in
accordance with Sec. 16-2-102.D, within 60 days after the application is submitted, or
such extended time agreed to by the applicant.
iv. If the Official fails to act on an application for Development Plan Review, in accordance
with Sec. 16-2-102.D, within the time period in provision iv above, the application shall
be deemed approved, and the Town shall issue the applicant a letter of approval and
written notice to proceed based on the submitted application.
ATTACHMENTS:
A. DPR-000073-2026 - Narrative
B. DPR-000073-2026 - Site Plan
Page 32 of 34
January 22 th , 2026
Via: Email Submission
Town Of Hilton Head Community Development Department
One Town Center Court
Hilton Head Island, SC 29928
Bank Retrofit Project Narrative
The submitted plans propose site renovations on th e existing Truist Bank located
at 2 Lafayette Place, Hilton Head Island, SC. The c urrent building will be retrofitted to
house a new tenant, and the parking lot revised to meet ADA requirements. The current
ADA spaces and access on the north side of the buil ding currently do not meet
requirements, so the new tenant is proposing to red o these spaces to be compliant.
Additionally, the existing bank drive-thru lane and canopy will be demolished and replaced
with an ATM drive-thru lane and large landscape island. This will result in the net removal
of impervious area due to these improvements on sit e. Some areas of the asphalt will
need to be fully removed and repaved to allow for precise grading, but the majority of the
lot will be milled and overlayed as to not cause disturbance.
Please reference the attached construction documen ts for further details on this
work.
BOHLER/
Page 33 of 34
WILLIAM HILTON PARKWAY(U.S. HIGHWAY 278)
LAFAYETTE PLACE
LOT "E""A SUBDIVISION PLAT OFINDIGO PARK PHASE II"PB 53 PG 144LAND OFINDIGO RUN OWNER, LLCDB 3244 PG 1847PIN: R510 008 000 0409 00002.503 ACRES OR109,025 SFC6N88°39'07"W129.67'
C8
C9
C10N36°46'49"W 292.69'
LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD
4
20'20'
~LANDSCAPED AREA~
~LANDSCAPED AREA~
PROP 5' CURB TRANSITIONS
5'
9'MIN.(TYP.)18' MIN. (TYP.)
18' MIN. (TYP.)9'MIN.(TYP.)
18' MIN. (TYP.)9'MIN.(TYP.)
18' MIN. TYP.9' MINTYP.9' MIN.TYP.18' MIN. TYP.
9'MIN.(TYP.)18' MIN.(TYP.)9.8'9.8'15.6'10' MIN.TYP.BAYENDS10' MIN.TYP.BAYENDS
10' MIN.TYP.BAYENDS
10' MIN.TYP.BAYENDS
10' MIN.TYP.BAYENDS
10' MIN.TYP.BAYENDS
10' MIN.TYP.BAYENDS10' MIN.TYP.BAYENDS 10' MIN.TYP.BAYENDS
12'12'
PROP MECHANICALENCLOSURE (SEEARCH/MEP PLANSFOR DETAILS
37.6'
12'24'PROP (5)BICYCLE BIKERACKPROP (5)BICYCLE BIKERACK
PROP (5)BICYCLE BIKERACK
PROP "STOP" SIGN" &"DO NOT ENTER" SIGNMOUNTED ON SAMEPOST
PROP EV PARKINGSTALL - ELECTRICALEQUIPMENT DESIGNEDBY OTHERS11'
18.3'
14.4'
PROP DETECTABLEWARNING SURFACE (TYP)11.6'
PROP 18" CURBAND GUTTER (TYP)PROP 5'SIDEWALK (TYP)
LIMIT OF PROPCURB AND GUTTER
LIMIT OF PROPCURB AND GUTTER(TIE INTO EXISTING)
LIMIT OF PROPCURB AND GUTTERPROP CURBRAMPPROPBOLLARD ADASIGN (TYP.)PROP BOLLARD ADASIGN (TYP.)LIMIT OF PROPCURB AND GUTTER
20'
9.6'9'9'15.2'
PROP TRASHENCLOSURE (SEE ARCH)
PROP "STOP" SIGNPROP "RIGHT TURNONLY" SIGN
PROP "LEFT TURNONLY" SIGN
5'5'5'9.6'
5'5'
5'
5'
5'
5'
5'
10'
10'R
6.3'R250.3'R5'R5'R5'R5.5'R
5'R2'R
10'R 25'R15'R
17'R
10'R 5'R5'R200'R9'MIN.(TYP.)10' MIN.TYP.BAYENDS
9'MIN.(TYP.)
LIMIT OF PROPCURB AND GUTTERLIMIT OF PROPCURB AND GUTTER
PROP CURB ANDGUTTER
13'7'
PROP "STOP" SIGN" &"DO NOT ENTER" SIGNMOUNTED ON SAMEPOST
10' MIN.TYP.BAYENDS
PROP PAINTED WHITEMEDIAN WITH 45°STRIPES SPACED AT2FT-O.C.
10' MIN.TYP.BAYENDS11.5'
10' MIN.TYP.BAYENDS
18' MIN. (TYP.)
THIS PLAN TO BE UTILIZEDFOR SITE LAYOUT PURPOSESONLY0SCALE:1" = 20'2020510
PAVING LEGENDREGULAR DUTY ASPHALTHEAVY DUTY CONCRETE1.5" MILL AND OVERLAY (PER SCDOTSTANDARDS/SPECIFICATIONS)CONCRETE SIDEWALK
PAVEMENT CONSTRUCTION SUMMARY TABLEAPPROX. FULL DEPTH PAVEMENT REMOVALAREAAPPROX. 1.5" MILL AND OVERLAY AREATOTAL26,522 SF (0.61AC)16,138 SF (0.37AC)42,660 SF (0.98AC)SEE SECTION DETAILS ON SHEET C-901
1
REVISION 1 -
REVISIONSREVDATECOMMENTDRAWN BYCHECKED BY2/26/261ST REVIEW TOWN OFHILTON HEADHMMJ
2/26/26
1927 S. TRYON STREET, SUITE 310CHARLOTTE, NC 28203Phone:(980) 272-3400Fax:(980) 272-3401NC@BohlerEng.comNCBELS P-1132BOHLER ENGINEERING NC, PLLC
THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTENAUTHORIZATION FROM BOHLER. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©
SITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTLANDSCAPE ARCHITECTURESUSTAINABLE DESIGNPERMITTING SERVICESTRANSPORTATION SERVICESBOHLER ENGINEERING NC, PLLC
BOHLER
Feb 27, 2026
Know what's below.Call before you dig.ALWAYS CALL 811It's fast. It's free. It's the law.
SOUTH CAROLINACERTIFICATE OF AUTHORIZATIONBOHLERENGINEERINGNC PLLCNO. 4810
REENIGNELANOISSEFORPDESNECILNo. 35866R. ALLEN MCDOWELLSOUTH CAROLINA2/27/26
FOR CONCEPTPURPOSES ONLY
Feb 27, 2026
DISCLAIMERThis drawing and/or file has been prepared by Bohler at the request of the Project Owner or his Representative and is being provided solely as a convenience to the recipient. Bohler makes no representation regarding the suitability for the intended use by the recipient. Further, Bohler makes no
PROJECT No.:DRAWN BY:CHECKED BY:DATE:CAD I.D.:PROJECT:
H:\2025\NCA250028.00\CAD\DRAWINGS\PLAN SETS\CIVIL SITE PLANS\P-CIVL-SITE-NCA250028.00-0A----->LAYOUT: C-301 SITEHMSHEET NUMBER:
SHEET TITLE:
Feb 27, 2026
DISCLAIMERThis drawing and/or file has been prepared by Bohler at the request of the Project Owner or his Representative and is being provided solely as a convenience to the recipient. Bohler makes no representation regarding the suitability for the intended use by the recipient. Further, Bohler makes no
PROJECT No.:DRAWN BY:CHECKED BY:DATE:CAD I.D.:PROJECT:FOR
H:\2025\NCA250028.00\CAD\DRAWINGS\PLAN SETS\CIVIL SITE PLANS\P-CIVL-SITE-NCA250028.00-0A----->LAYOUT: C-301 SITEHM
THIS DRAWING IS INTENDED FOR MUNICIPAL AND/OR AGENCYREVIEW AND APPROVAL. IT IS NOT INTENDED AS A CONSTRUCTIONDOCUMENT UNLESS INDICATED OTHERWISE.
SHEET NUMBER:
SHEET TITLE:
NCA250028.00-0AHMMJ10/27/2025P-CIVL-SITEPROP.SITE PLANDOCUMENTSPROPOSEDCHASE BANK2 LAFAYETTE PLACEHILTON HEAD ISLAND, SC 29926PID: R510 008 000 0409 0000
ZONING TABLEZONING DISTRICT: MAIN STREET (MS)USE: OTHER, COMMERCIAL SERVICESAPPLICANT/ OWNER INFORMATIONAPPLICANT:JPMORGAN CHASE N.A.1111 POLARIS PARKWAY,COLUMBUS, OH 43240PROPERTY OWNER:INDIGO RUN OWNER LLC41 ISLE OF VENICE DR, APT 302FORT LAUDERDALE, FL 33301BULK REQUIREMENTSITEMREQUIREDPROPOSEDMIN LOT AREAN/A2.503 (AC)MIN LOT WIDTHN/ATBD MIN YARD SETBACKSFRONT SETBACK20'20' SIDE YARD SETBACK20'20' REAR SETBACK50'50' MAX PERMITTED HEIGHT45'35' - 2"MIN LANDSCAPE BUFFERSFRONTNONE- SIDENONE- REAR60'60' PARKING REQUIREMENTSMINIMUM REQUIRED STALLS1 SPACE PER 350 SF GFA (24SPACES)50 ACCESSIBLE STALLS2 ADA SPACE FOR 26 TO 50 TOTALSPACES2 EV STALLS11 BICYCLE PARKINGNONE SINCE EXISTING BUILDING ISNOT INCREASING SF15
C-301SITEPLAN
GENERAL NOTES1.PARKING SPACES SHALL BE MARKED WITH WHITE PAINTED LINES,EXCEPT WHERE ACCESSIBILITY REQUIREMENTS REQUIRE THAT SPACESBE DELINEATED IN BLUE. PAINTED YELLOW LINES ARE FOR MARKING NOPARKING AREAS.2.ALL UNDERGROUND UTILITIES SHOWN ARE EXISTING TO REMAINUNLESS OTHERWISE SPECIFIED.
ZONING DISRICTMAIN STREET (MS)OVERLAY DISTRICTN/A USE OF PROPERTYBANKGROSS SITE ACRES2.503 ACNET SITE ACRES (GROSS ACRES-TIDAL WETLANDS2.503 ACALLOWED TOTAL DENSITY (NET ACRES X GFA)4.524 ACEXISTING BUILDING SQUARE FOOTAGE8,242 SFPROPOSED BUILDING SQUARE FOOTAGE0 ADDITIONALTOTAL SQUARE FOOTAGE8,242 SFMAXIMUM BUILDING HEIGHT ALLOWED45' PROPOSED BUILDING HEIGHT35' 2" MAXIMUM ALLOWED IMPERVIOUS AREA PERCENTAGE60% CURRENT IMPERVIOUS AREA AND PERCENTAGE1.22 AC / 48.7%PROPOSED IMPERVIOUS AREA AND PERCENTAGE1.16 AC / 46.3%MINIMUM NUMBER OF PARKING SPACES REQUIRED1 SPACE PER 350 SF GFA (24 SPACES)EXISITING NUMBER OF PARKING SPACES ON SITE51 PROPOSED ADDITIONAL PARKING SPACES50 TOTAL SPACESAREA OF DISTURBANCE0.53 ACFLOOD ZONESFEMA ZONE XPRE/POST IMPERVIOUS AREA SUMMARY TABLEAREA (SF)AREA (AC)% OF SITEPARCEL AREA109,0252.503- EXISTING IMPERVIOUS AREA53,143.21.2248.7% PROPOSED IMPERVIOUS AREA50,529.601.1646.3% NET CHANGE IN IMPERVIOUSAREA-2,613.6-0.06-2.4%
NOTE - EXISTING PAVEMENT THICKNESS WAS DETERMINED TOBE RELATIVELY THIN WITH NO SUBBASE MATERIAL BYGEOTECHNCAL ENGINEER. CONTRACTOR TO CONFIRMVIABILITY OF 1.5" MILL AND OVERLAY AND ADVISE OWNERIMMEDIATELY IF FULL DEPTH REPLACEMENT WILL BE REQUIREDNOTE - ALL PARKING STALLS TO BE RESTRIPED PER MINIMUMDIMENSIONS SHOWN ON THESE PLANS AFTER PAVEMENT ISOVERLAYED.