PUBLIC WORKS COMMITTEE
5:30 p.m., Wednesday, May 4, 2016
The regular meeting of the Public Works Committee was called to order at 5:30 p.m., Wednesday,
May 4, 2016 in the City Hall Conference Room, 1207 Palm Boulevard, Isle of Palms, South
Carolina. Attending the meeting were Councilmember Ferencz, Chair Ward, Administrator
Tucker, Director Pitts, Assistant Administrator Fragoso and Clerk Copeland; a quorum was
present to conduct business. Councilmember Kinghorn’s absence was excused.
1. Chair Ward called the meeting to order and acknowledged that the press and public had
been duly notified of the meeting in accordance with the Freedom of Information Act.
2. Approval of Previous Meeting’s Minutes
MOTION: Councilmember Ferencz moved to approve the minutes of the regular
meeting of April 5, 2016 as submitted; Ch air Ward seconded and the motion
PASSED UNANIMOUSLY.
MOTION: Chair Ward moved to re -order the Agenda to address Citizens’
Comments when the other guest arrives; Councilmember Ferencz seconded and
the motion PASSED UNANIMOUSLY.
4. Department Reports for April 2016 – Director Pitts
According to Director Pitts, in April, landscaping/road maintenance picked up, and Charleston
County stormwater crews were on the island cleaning several ditch systems primarily in the 21 st
to 41st Avenue area and the storm inlet at 57 th Avenue crossover. The Hazardous Waste and
Shred Day was held Saturday, April 16 th in cooperation with Charleston County; one hundred
seventy-six (176) cars delivered hazardous materials. Despite a small fire in the shredder, there
was more material to be shredded than was hazardous.
Yard debris was down considerably for the same month last year, but the delivery on Friday, April
29th was not included in the Director’s number. Garbage was down in April from the same month
last year.
Vehicle maintenance was quite high because several trucks needed preventative maintenance;
the Director still intends to end the year under or at budget.
5. Old Business
A. Review of Proposed FY17 Budgets
The Draft 2 budget is the one passed for First Reading and advertised in the newspaper, but staff
has some changes to propose for the next draft of the budget and they are as follows:
An increase o f $129,000 in parking meter revenue based on the increase of the hourly
rate to $1.50.
Public Works Committee
May 4, 2016
Page 2 of 5
Considering the possibility of either assuming responsibility of handling the City’s own
NPDES program or asking Mount Pleasant to do it, the City must have a third party
assessment by an engineering firm to determine the state of the City’s drainage system;
staff has estimated an additional $30,000 in expense.
The NPDES improvements for the Public Works site have become much more complex
since originally conceived; therefore, staff recommends approving a change order of
$10,500 to have bid assistance and construction oversight by Thomas and Hutton.
Since the buildings and grounds person was eliminated from the budget, an idea gained
from Mount Pleasant was to hire a construction company to assess the City’s facilities and
to generate a list of future maintenance issues for the City to address. The amount to be
added to the budget is $12,000, an average of $2,000 per building.
Councilmember Ferencz suggested getting, as part of the work product, a priority list of projects
to be done, what can be postponed and how long can it be postponed.
Based on conversations with the County, staff recommends adding back to the FY17
budget the cost of engineering and design for the public restrooms.
The County has approached the City about two (2) Joaquin -related FEMA projects that
would require the City to commit to paying the 25% match; one (1) is a cleanout and
assessment of all of the City’s drainage pipes costing the City $159,000; the second is the
replacement of the pipes crossing Ocean Boulevard between 4th Avenue and Breach Inlet
for 25 % of $58,000 per crossing with 8 crossings. The County’s representatives for these
programs will attend the Public Works meeting to explain the projects and to provide the
costs.
Based on experience this year, the vehicle m aintenance for the Fire Department will be
increased by $10,000.
Four (4) additional surveillance cameras will be added to the budget, the cameras will be
deployed at the municipal lots, at the compactor (may be done in FY16) and at the IOP
Water and Sewer Commission’s property on Waterway that is being considered for marina
employee parking. A camera, installation and technical aspects cost about $1,700 each.
Staff is also proposing a city -wide termite bond that will include coverage for Formosan
termites.
The Personnel Committee voted to add back the human resources position.
The Public Safety Committee voted to add back to the budget two (2) additional police
officers.
3. Citizens’ Comments
MOTION: Chair Ward moved to re-order the Agenda to address Item 6.A in coor-
dination with Citizens’ Comments; Councilmember Ferencz seconded and the
motion PASSED UNANIMOUSLY.
6. New Business
Public Works Committee
May 4, 2016
Page 3 of 5
A. Consideration of request from Charleston County for local share for cleaning
stormwater system and improving Ocean Boulevard drainage from 3 rd Avenue to
Breach Inlet
Guests attending the meeting from Charleston County were Frank Carson, the Project Manager
for FEMA projects and Chris Wannamaker, Acting Stormwater Manager.
Administrator Tucker explained that there are two (2) projects Charleston County is proposing to
do that would be funded by FEMA which requires a twenty -five percent (25%) local match, and,
to do these two (2) projects on the island, the County wants the City to commit to paying that local
match. One (1) project is on Ocean Boulevard between 4 th Avenue and Breach Inlet to replace
the eight (8) drain pipes under Ocean Boulevard; when asked to quote, Eadi e’s quoted the City
fifty-eight thousand dollars ($58,000) per pipe.
Mr. Carson stated that the Ocean Boulevard project falls under the FEMA Public Assistance
Program; after reviewing the information provided by Charleston County and its consultants, th e
cost estimate was two hundred fifty -three thousand seventy-seven dollars ($253,077) to replace
the nine (9) pipes and resurface the road. The twenty-five percent (25%) local match equals sixty-
three thousand two hundred seventy dollars ($63,270).
The second project is more expensive and the Administrator has computed the City’s match to
be one hundred fifty -nine thousand dollars ($159,000). In this project, all of the piped drainage
on the island will be flushed and cleaned, videotaped before and after to show the need and that
the work has been done. This project has been estimated to cost six hundred thirty thousand two
hundred seventy -seven dollars ($630,277) for sixty -seven thousand feet (67,000) of pipe; the
City’s match for this project would be one hundred fifty -nine thousand five hundred sixty -nine
dollars ($159,569). The total for the two (2) projects is approximately two hundred twenty -one
thousand dollars ($221,000).
When the discussions began, particularly on this last project, the Admi nistrator was told that the
City could use its NPDES funds to fund the match, but the problem is that the City already plans
to use the funds for the NPDES improvements at the Public Works site. The Administrator voiced
doubt that there would be enough mo ney left of the City’s NPDES funds to cover the match for
these projects.
Councilmember Ward said that he was all for saving money for this type of project; he noted that
the City received a million dollars ($1,000,000) more in tourism funds, and it is all gone. He stated
that the City needs to save and to stop spending so that, when projects like these come up, the
City is prepared to do them.
The Administrator was confident that the City could cover these costs, but they were not antici -
pated. The City can use some drainage money that it has been saving and use what differential
is left in NPDES funds after the Public Works improvements. At the moment, Charleston County
says that the NPDES funds they are h olding total three hundred forty -two thousand dollars
($342,000), and the City plans to spend one hundred ninety thousand dollars ($190,000) at Public
Works, but that project has not yet been bid, and the numbers are based on estimates. There -
fore the County must agree to pick up the difference or the City needs to budget for it.
Public Works Committee
May 4, 2016
Page 4 of 5
Mr. Carson said that, if it is in the City’s budget to be collected, that could be used instead of the
General Fund – against future collections.
Mr. Wannamaker noted that, with an annual stormwater fee of forty-eight dollars ($48) per ERU,
there is no money for contingency, but, on average , the City has received forty-two thousand
dollars ($42,000) per year at the thirty-six dollar ($36) rate.
Chair Ward commented that, if the City went to a sixty dollar ($60) fee, twelve dollars ($12) could
be going to contingency, and Mr. Wannamaker agreed. The Cha ir noted that to hold off hiring
the two (2) additional officers who will work in the office doing paperwork would cover the cost of
these projects.
Director Pitts stated that it would be in the city’s best interest to maintain twenty-five percent (25%)
of the three hundred forty -two thousand dollars ($342,000) minimum in NPDES funds for an
emergency as long as the County is managing the City’s funds.
Councilmember Ferencz thought the cleaning and videotaping of the piped drainage system on
the island was a great opportunity for the City, but the budget must be reduced.
Administrator Tucker reiterated that this is investigative work, not repair work.
According to Director Pitts, with a videotape of the closed pipe system on the island, the City w ill
know what it has and know what is needed in the future.
Mr. Carson said that, if damage is found when they are videotaping, work could be added to the
scope of FEMA work and it would cost the City twenty-five cents ($0.25) on the dollar because it
would still be under the FEMA Public Assistance Program.
Administrator Tucker said that she was hearing that the Committee would agree to support the
twenty-five percent (25%) local share for these projects and add them to the budget.
Chair Ward made it clear that he was agreeing to this with one (1) stipulation, i.e. that the City cut
additional spending in other areas dollar for dollar.
MOTION: Councilmember Ferencz moved to recommend to the Ways and
Means Committee that the City agrees to the 25% loc al share on these 2 projects
and that the majority would come from the balance left in the NPDES fund and any
difference would be included in the FY17 budget with the understanding that
Council would reduce expense elsewhere to compensate for the amount budgeted;
Chair Ward seconded and the motion PASSED UNANIMOUSLY.
5. Old Business, cont’d
B. Update on golf cart path between 20th Avenue and the Island Center
Public Works Committee
May 4, 2016
Page 5 of 5
The good news is that the City has received the SCDOT permit. The drawing included in meeting
packets shows the proposed location of the path that people have been using already; it is much
safer.
Chair Ward asked when the project would go out for bid, and the Administrator said it would be
as fast as it could be. Bids are expected to be in the one hundred thousand dollar ($100,000)
range.
The Administrator commented that she would like to find a way to do the same on the other side
of Palm, but she does have a quick answer on how to do it.
C. Status of Phase II Drainage
Assistant Fragoso reported t hat the City is waiting on one ( 1) easement from the Yacht Club at
Morgan’s Cove Marina Association who owns the parking lot adjacent to the temporary golf cart
path or the City will have to move the golf cart path to begin construction. They have asked the
City to clean a vac line on their property that connects to the drainage the City will be replacing.
Attorney Halversen is assisting with the legalities of doing work on private property and the City
is trying to decide if it can do the project without the easement.
Assistant Fragoso also reported that she and the Administrator had met with the Director of the
IOP Water and Sewer Commission, and they have agreed to sign the easement; the exact
language for the easement is being finalized.
6. New Business
B. Consideration of Change Order to Thomas and Hutton Agreement in an
amount up to $10,500 to allow for bid and construction oversight
Since the NPDES project at Public Works was originally envisioned, it has become much more
complicated and complex; when the RFP was issued, the bid assistance and construction
oversight were omitted. The City needs Thomas and Hutton’s assistance in writing the technical
portion of the RFP and in evaluating the bid; once the contract is awarded, they will provide
construction oversight.
MOTION: Councilmember Ferencz moved to recommend approval of a change
order to Thomas and Hutton in the amount up to $10,500 to allow for bid and con -
struction oversight; Chair Ward seconded and the motion PASSED UNANIMOUSLY.
7. Miscellaneous Business
Next Meeting Date: 4:30 p.m., Thursday, June 2, 2016 in the Conference Room.
8. Adjournment
MOTION: Councilmember Ferencz moved to adjourn at 6:33 p.m.; Chair Ward
seconded and the motion PASSED UNANIMOUSLY.