Onsite Meeting 3/14/24 2pm Pacolet Town Hall Attendees: Brad Grant, BIS Digital Robert Jenning, Vision Contracting LLC Ridge Conner, Dunbar Construction Matt Stewart, Liles Construction Zach Biggin, Liles Construction Lee Harley, Madco Contracting Russ Moore, Hames Pro Daryl Camby, Langston Const. Troy McDowell, 3J Creations Town Staff: Patrick Kay, Town Administrator Brian Blackwell, Building Inspector (RCI) Questions & Answers: o What is the placement of the TV’s for the Audio Visual (A/V)? ▪ Placement should allow for the audience to easily see presentation screens. o Do you want to replace the lectern to match the finishes of the new council platform? ▪ Yes, but it needs to be moveable. o Can we come back at another time with sub-contractors to take measurements, etc.? ▪ Yes, you can come during our normal business hours, however, please call to ensure that we will be here. o Will there be permit fees? ▪ Permits are required for this project however all fees will be waived. o Will there be an individual operating the A/V system? ▪ The Town Administrator, who also presents during Council Meetings is also responsible for operating the A/V system, so it needs to be able to be done easily. The system can be in the current A/V closet. o Will there be a plumbing contingency as the existing plumbing is behind the walls? ▪ All plumbing except for in the walls can be inspected as the floor is open below. But we will consider and allow for a contingency on plumbing. o With 7 iPads, screens and the surface pro, how will everything be connected? ▪ We were planning on using a wireless technology like Zoom, but open to other suggestions. o If we provide an ethernet line at each location where there is a screen for display options, will there be enough room in the existing switch? ▪ No, there will need to be an additional switch added if you go this direction with the A/V . Additional Questions Emailed to Patrick Kay: • As discussed we are going to add a lectern to match the councils desk. o At the onsite meeting we initially agreed to add this to the scope of work, but since then, to save on costs, this should not be included in the final quote. We will provide our own removable lectern. • The lectern needs to have the ability to plug into an outlet into the floor for power? o In the floor should be a box with an electrical outlet and A/V connections and future open spots for Cat6, etc. • Does it need a data drop also? o yes • Do you want to add 2 tables to be made to match councils desk and the lectern? o To save on cost, no tables, but we will need an in floor box with A/V , Power, and Cat6. We will provide our own removable tables • With data drops and power? o Yes in floor box • I also see an ADA lift to the right of the council’s desk. o It should be a separate part of your quote to be added as needed • Do we need to provide that? o At this time, include it as an additional cost • What is the specific call out for the flooring on the raised council’s platform to include steps ? o Commercial rated VCT approved for wet areas with cove base • What is the exact style of flooring for the bathrooms ? o Commercial rated VCT approved for wet areas with cove base • The doors being up front you want them to swing out do you want to use the same doors and hardware ? o Swing out and use existing hardware or similar style to match existing • Will the owner or GC be responsible for Permit Fee's? o Contractor will be responsible for obtaining permits, but there will be no fee • Is Builders Risk Insurance provided by owner or GC? o This will be provided by the Contractor • Will a Payment and Performance bond required? o No, however there will be a contract required before starting to ensure that we receive the completed work and the contractor is paid accordingly • Is a Bid Bond required? o no • Is the 5X5 platform lift in the current scope of work? The note says future but want to confirm. Please advise. o If this is the same question as before, the answer is the same: It should be a separate part of your quote to be added as needed. • Will there be fire suppression needed? o No • Do we need to hire an electrician if we're only providing A/V equipment? o Where electrical work is required based on the plans, that needs to be installed by a licensed electrician that is hired by the General Contractor. Any installation of A/V wires/cables is the responsibility of the A/V Contractor.

Source: Town of Pacolet website. First collected Oct 17, 2026.