Onsite Meeting
3/14/24
2pm
Pacolet Town Hall
Attendees:
Brad Grant, BIS Digital
Robert Jenning, Vision Contracting LLC
Ridge Conner, Dunbar Construction
Matt Stewart, Liles Construction
Zach Biggin, Liles Construction
Lee Harley, Madco Contracting
Russ Moore, Hames Pro
Daryl Camby, Langston Const.
Troy McDowell, 3J Creations
Town Staff:
Patrick Kay, Town Administrator
Brian Blackwell, Building Inspector (RCI)
Questions & Answers:
o What is the placement of the TV’s for the Audio Visual (A/V)?
▪ Placement should allow for the audience to easily see presentation
screens.
o Do you want to replace the lectern to match the finishes of the new council
platform?
▪ Yes, but it needs to be moveable.
o Can we come back at another time with sub-contractors to take measurements,
etc.?
▪ Yes, you can come during our normal business hours, however, please
call to ensure that we will be here.
o Will there be permit fees?
▪ Permits are required for this project however all fees will be waived.
o Will there be an individual operating the A/V system?
▪ The Town Administrator, who also presents during Council Meetings is
also responsible for operating the A/V system, so it needs to be able to be
done easily. The system can be in the current A/V closet.
o Will there be a plumbing contingency as the existing plumbing is behind the
walls?
▪ All plumbing except for in the walls can be inspected as the floor is open
below. But we will consider and allow for a contingency on plumbing.
o With 7 iPads, screens and the surface pro, how will everything be connected?
▪ We were planning on using a wireless technology like Zoom, but open to
other suggestions.
o If we provide an ethernet line at each location where there is a screen for display
options, will there be enough room in the existing switch?
▪ No, there will need to be an additional switch added if you go this
direction with the A/V .
Additional Questions Emailed to Patrick Kay:
• As discussed we are going to add a lectern to match the councils desk.
o At the onsite meeting we initially agreed to add this to the scope of work, but
since then, to save on costs, this should not be included in the final quote.
We will provide our own removable lectern.
• The lectern needs to have the ability to plug into an outlet into the floor for power?
o In the floor should be a box with an electrical outlet and A/V connections and
future open spots for Cat6, etc.
• Does it need a data drop also?
o yes
• Do you want to add 2 tables to be made to match councils desk and the lectern?
o To save on cost, no tables, but we will need an in floor box with A/V , Power,
and Cat6. We will provide our own removable tables
• With data drops and power?
o Yes in floor box
• I also see an ADA lift to the right of the council’s desk.
o It should be a separate part of your quote to be added as needed
• Do we need to provide that?
o At this time, include it as an additional cost
• What is the specific call out for the flooring on the raised council’s platform to
include steps ?
o Commercial rated VCT approved for wet areas with cove base
• What is the exact style of flooring for the bathrooms ?
o Commercial rated VCT approved for wet areas with cove base
• The doors being up front you want them to swing out do you want to use the same
doors and hardware ?
o Swing out and use existing hardware or similar style to match existing
• Will the owner or GC be responsible for Permit Fee's?
o Contractor will be responsible for obtaining permits, but there will be no fee
• Is Builders Risk Insurance provided by owner or GC?
o This will be provided by the Contractor
• Will a Payment and Performance bond required?
o No, however there will be a contract required before starting to ensure that
we receive the completed work and the contractor is paid accordingly
• Is a Bid Bond required?
o no
• Is the 5X5 platform lift in the current scope of work? The note says future but want to
confirm. Please advise.
o If this is the same question as before, the answer is the same: It should be a
separate part of your quote to be added as needed.
• Will there be fire suppression needed?
o no