NEW APPLICATIONS
TRC-25-43: Site Plan – Proposed 155 Single-Family In-Common Project – PIN:
34800000036, 35803030001, 34813040002
Attending
Customer
Representatives:
Philip Hornbeck, Engineer
Staff Comments
Public Works: No comments
Zoning: No comments
Building: No comments
Fire: No comments
Planning: 1. MILLROSE PROPERTIES SOUTH CAROLINA LLC is required to obtain a
business license before this step can be approved.
TRC-24-19: Site Plan – Amenity Center at Kingswood on the Waterway – PIN: 35700000006
Attending
Customer
Representatives:
Amber Wall, Applicant
Staff Comments
Public Works: 1. Private water service and irrigation lines in landscape area subject to damage.
Zoning: No comments
Building: No comments
Fire: No comments
Planning: No comments
SUB-25-57: Major Preliminary – Cottages on Main Street – PIN: 35602040139
Attending
Customer
Representatives:
Bob Weaver, Engineer
Staff Comments
Public Works: 1. Comments pending.
Zoning: No comments
Building: No comments
Fire: No comments
Planning: 2. Update the Site Data table to reflect the correct smallest and largest lot sizes.
TRC Minutes 03.26.26 Page 2 of 3
TRC-25-41: Site Plan – 7-11 at 9207 Water Tower Road
Attending
Customer
Representatives:
James Baldwin, Engineer
Staff Comments
Public Works: No comments
Zoning: No comments
Building: No comments
Fire: 1. Add the following requirements to the utility plans for underground piping in
accordance with NFPA 24 and the City of North Myrtle Beach Public Utilities
Guidebook: piping and fittings must meet all applicable standards; bituminous
coating is required (NFPA 24); minimum 36” burial depth (NFPA 24); trace
wire required for CPVC piping; visual inspection required prior to backfill;
proper thrust blocking per City standards; hydrostatic testing at 200 PSI for 2
hours (NFPA 24); flushing of piping system (NFPA 24); and submission of
NFPA 24 certificate. Please also refer to the City of North Myrtle Beach Public
Utilities Guidebook for additional specifications.
2. A fire protection engineer will have to do an evaluation on the fire flow for the
boat storage building to assure the water supply mains are adequate to supply
the sprinkler system and fire hydrant demands. 6-inch fire main may not be
adequate.
3. I did not see the FDC location for the boat storage building. Details for FDC
needed for both buildings.
4. Fire hose pull shall not exceed 150ft, for the storage facility. Standpipes may be
required.
Planning: 5. If REDLEONARD ASSOCIATES will be coming to the site anytime during
this project, they will have a business license requirement. An application was
emailed to jayme.leonard@redleonard.com.
TRC-25-53: Site Plan – Proposed Sanitation Office at 1220 2nd Avenue North
Attending
Customer
Representatives:
David Bottiglierie, Engineer
Staff Comments
Public Works: No comments
Zoning: No comments
Building: No comments
Fire: No comments
Planning: 1. Needs landscaping plan prior to bid.
TRC-22-24: Site Plan – Reapproval of Site Plan at 5905 North Ocean Boulevard
Attending
Customer
Representatives:
Tim Dunkin Sr., Developer
Staff Comments
TRC Minutes 03.26.26 Page 3 of 3
Public Works: No comments
Zoning: No comments
Building: No comments
Fire: No comments
Planning: No comments
Source: City of North Myrtle Beach website. First collected Oct 17, 2026.