RecordWell Data

PC_Minutes_2025-05-27

City of Mauldin · Greenville County · meeting of Jul 16, 2025 · Minutes

Open the original document More from City of Mauldin

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Page 1 of 3 MAULDIN PLANNING COMMISSION MINUTES May 27, 2025 6:00 P.M. MEMBERS PRESENT: Jonathan Paulsen, Randy Eskridge, Kevin Greene, Chauncelynn Locklear, Lyon Bixler, Raj Reddy, Dan Chism MEMBERS ABSENT: None CITY STAFF PRESENT: David Dyrhaug CALL TO ORDER/OPENING REMARKS Mr. Paulsen called the meeting to order at 6:00 P.M. Mr. Dyrhaug held roll call. READING OF MINUTES Mr. Eskridge moved to accept the minutes for the April 22, 2025, Planning Commission meeting. Ms. Locklear seconded the motion. The motion to accept the minutes for the April 22, 2025, Planning Commission meeting passed by unanimous vote, 7-0. OLD BUSINESS No old business was discussed. NEW BUSINESS Docket #: PC-2025-04-PP Request: Preliminary Plat for Park Towns at Fowler Subdivision Mr. Dyrhaug introduced a request for approval of a preliminary plat for the Park Towns at Fowler subdivision. The applicant is proposing to develop and subdivide this tract for 38 attached single-family homes on this 2.25-acre tract of land. Mr. Dyrhaug also introduced the applicant’s request for approval of a reduced building setback along the north property line as well as limited reduction in the building setback along the south property adjacent to the first building closest to Fowler Circle. Ms. Madelyn Moore, with Bluewater Civil, introduced herself as the representative for the applicant. Mr. Paulsen opened the floor to public comments. No public comments were offered. Page 2 of 3 Hearing no public comments, Mr. Paulsen closed the floor to public comments. Mr. Chism asked various questions to which Ms. Moore responded. These included questions and comments about the ownership of the internal road, the discharge location of the stormwater, the hardship creating the need for the setback variance, and the traffic at the Fowler Circle and W. Butler Road intersection. Mr. Dyrhaug provided the staff report and recommendation. Mr. Chism asked Ms. Moore about the possibility of moving the stormwater management pond to the south side of the new road. Mr. Eskridge asked Mr. Dyrhaug if this project would go to the City Council or come back to the Planning Commission. Mr. Dyrhaug indicated that it would not. Mr. Greene asked Ms. Moore if the stormwater management pond would serve both this project and the adjacent future commercial development. Ms. Moore indicated that it would. Mr. Bixler asked about the type of features that could be located in the setback area. Mr. Eskridge made a motion to conditionally approve the preliminary plat for the Park Towns at Fowler subdivision and the accompanying variances requested. The conditions of this approval included: 1. The applicant shall satisfy the applicable conditions provided by the Greenville County Subdivision Advisory Committee. 2. The full civil engineering and landscape plans shall meet the standards in the codes and ordinances for the City of Mauldin. 3. The sidewalk typically required along Park Towns Court may alternatively be located along the north property line so as to enhance the pedestrian connectivity with the adjacent commercial development. 4. The minimum building setback along the north property line may be reduced to 15 feet. 5. The minimum building setback along the south property line directly adjacent to lots 1-5 may be reduced as depicted on the preliminary plat. 6. The applicant shall expand the tree preservation area along the south property line to include the area adjacent to lots 1-5. Alternatively, the applicant may provide an enhanced buffer adjacent to lots 1-5 with plantings equivalent to the number, type, and size of plantings associated with a “Type A” transition buffer as provided in Section 6:2.8 of the Mauldin Zoning Ordinance. 7. The applicant shall provide an enhanced buffer along the face of the stormwater management area fronting Fowler Circle. The number, type, and size of plantings in this buffer must be equivalent to those associated with a “Type A” transition buffer as provided in Section 6:2.8 of the Mauldin Zoning Ordinance. Page 3 of 3 8. Any fencing required around the stormwater management area must be ornamental in design in the style of a wrought iron fence. Chain link fencing is specifically prohibited around the stormwater management area. Ms. Locklear seconded the motion. The motion to conditionally approve the preliminary plat for the Park Townes at Fowler subdivision passed by a vote of 5-2 with Mr. Chism and Mr. Bixler in dissent. OTHER BUSINESS No other business was discussed. ADJOURNMENT Ms. Locklear moved to adjourn the meeting. Mr. Eskridge seconded the motion. The motion to adjourn this meeting passed by unanimous vote, 7-0. The Planning Commission meeting adjourned at 6:45 p.m.

Source: City of Mauldin website. First collected Oct 23, 2026.