MINUTES
PUBLIC WORKS COMMITTEE MEETING
MAY 5, 2025 6PM
CITY HALL - COUNCIL CHAMBERS
5 E. BUTLER ROAD
6th and final commitee mee�ng
Commitee Members present: Jason Kraeling (Chair) and Carol King. Councilman Michael
Reynolds was not present.
Others present: PW Director Mathew Fleahman and City Administrator Seth Duncan
1. Call to Order- Chairman Kraeling
2. Public Comment- None
3. Reading and Approval of Minutes
a. Public Works Commitee- April 7, 2025
Mo�on: Councilwoman King made a mo�on to accept the minutes with Chairman
Kraeling seconding.
Vote: The vote was unanimous (2-0).
4. Reports or Communica�ons from City Officers
a. PW Director Mathew Fleahman
Duke Easements- East Butler Road
Mr. Fleahman said there is no update ready for the easement item.
The house at 4 Murray Drive was demolished. The work was contracted out.
The floor repair at the cultural center is complete and came in $20,000 under budget.
The Blues and Jazz fes�val went very well. The department pulled together to cover the
holes in front of the amphitheater that were le� by the contractor before the event.
There is an old wooden walking bridge on the rear of the walking trail that was in need of
some repairs. The bridge was removed and block walls will be installed to con�nue the
concrete walking trail. The stream will be piped. This will prevent any slip, trip or fall
accidents.
All informa�on has been submited on the Oak Park stormwater project. The Army Corps
of Engineers has come back and said the project will be considered as maintenance, which
removes the requirement for permits and cuts down on the expense. FEMA is currently
changing the flood maps and the project can poten�ally go out to bid in 60 days.
On that note, Chairman Kraeling said he is going to try and go out to Meadowood when it
is raining to see the flooding men�oned tonight. Mr. Fleahman said it is an older
neighborhood with no stormwater infrastructure.
5. Unfinished Business- None
6. New Business- None
7. Public Comment
a. John Rainey- 103 Woodgreen Drive. Mr. Rainey men�oned the houses in the
neighborhood up the road from Meadowood are sloped and their water runs to
Meadowood. Also, when the roads were resurfaced in Meadowood, the contractor
covered the lip that was in front of the driveways with asphalt.
8. Commitee Concerns- None
9. Adjournment- Chairman Kraeling adjourned the mee�ng at 8:19 p.m.
Respec�ully Submited,
Cindy Miller
Municipal Clerk