TOWN OF MOUNT PLEASANT, SC PUBLIC SERVICES COMMITTEE Monday, July 6, 2026 10:15 a.m. Municipal Complex, Council Chambers 100 Ann Edwards Lane, Mount Pleasant, SC 29464 Present: Chair Mike Tinkey, Alex Crosby, Laura Hyatt Absent: John Iacofano Staff Present: Eric DeMoura, Andy Weis View the Presentation Here Listen to the Meeting Here AGENDA 1. Call to order The meeting was called to order on Monday, July 6, 2026 at 10:15 A.M. Chairman Mike Tinkey opened by commending the police, public services, and fire departments for their work during the July 4th 250th anniversary celebration. 2. Approval of Minutes from the June 1, 2026 meeting Council Member Laura Hyatt moved to approve the minutes from the June 1, 2026 meeting, seconded by Council Member Alex Crosby. The motion carried. 3. Public Comments No public comments were received. The public comment period was closed. 4. Employee years of service Public Services Director Andy Weis recognized Dawn Roscoe for five years of service as a grounds and events foreman. Director Weis noted that she was unable to attend the meeting and would be recognized in-house. 5. Presentation and overview of the completed Public Services Operations Center and Administrative Building Director Weis presented an overview of the completed Phases 1 through 3 of the Public Services Operations Center at the 6 Mile facility. Master planning began in August 2018 with a directive to design a facility capable of serving Mount Pleasant for 50 years. The strategic, central location of the 6 Mile facility was cited as the primary reason for prioritizing its development, as it enables timely service delivery and full departmental consolidation. The three phases were completed as follows: Phase 1 — Transfer Yard (completed July 2024, $5M+): Provides a centralized weekly collection point for bulk and vegetation items, with capacity for larger hauling trucks. A Vactor pad for stormwater pipe cleaning was also constructed. Phase 2 — Fleet Maintenance Building (completed 2024, $13,769,000): Features four heavy-duty bays, six light-duty bays, offices, and parts storage, with built-in capacity to expand by one heavy bay and two additional light bays as the town grows. Phase 3 — Public Services Operations Center / Administrative Building (completed June 2026, $20,655,000): A 19,818 square-foot facility housing office spaces, a training room capable of serving as a backup Emergency Operations Center, an industrial kitchen and laundry facilities for storm operations, employee fitness facilities, and conference rooms. The total cost for all three phases was $39,729,000. Director Weis noted that a few punch list items remain but that the project is substantially complete. Future phases — including a new fuel island, warehouse space, equipment parking, a signal shop, and open material storage — are currently being remaster planned following drainage adjustments made during construction, with a cost estimate to be developed for future Capital Improvement Program (CIP) consideration. The Chair thanked previous councils, Director Weis, and the broader team for their leadership, describing the facility as "world class." He also acknowledged ongoing efforts to be a good neighbor to the surrounding community, including tree plantings and operational adjustments for noise mitigation. Council Member Laura Hyatt expressed pride in the facility, and the Chair and Council Members offered additional commendations. 6. Overview of FY 2026 Quarterly Project Updates and upcoming project schedule Director Weis presented the quarterly CIP and Capital Maintenance Program (CMP) update. Operations Center Phase 4: The updated master plan is under final review, which will include a cost estimate. This will be submitted for future CIP consideration and can be built in phases if needed to assist with funding. Pit Street Bridge: Following Council direction to consolidate the project into a single effort, exploratory digging was completed in Q4. Findings indicated highly fine soil as the primary driver of sinkholes near the seawall. A detailed design scope is being developed and will be contracted to an on-call engineering firm beginning in Q1. The Chair briefly highlighted the historical significance of the Pit Street Bridge dating to the pre-Revolutionary War era. Stormwater Pipelining: $588,000 in pipelining was completed in Q4 in neighborhoods including Hidden Lakes, Wharf Indigo, Creekside, and the Enclave. Approximately $318,000 in lining work is planned for Q1, with additional work at Patty Lane pending further investigation. Pipe Replacement: A major replacement in the Enclave cost approximately $359,000 after conditions were found to be worse than initially assessed. Q1 projects include Queens Court (approved at Bids and Purchases), Parker's Landing in Rivertown (a complex engineered project), and Ferry Street/Penn Street (approved at Bids and Purchases). A project on Anna Nap is also under consideration pending pricing. Stormwater Structure Repairs: $128,000 in repairs was completed in Q4. $414,000 in structure repairs is planned for Q1 across Mount Pleasant. Ditch Maintenance and Rehabilitation: Approximately $208,000 in work was completed in Q4. No work is scheduled for Q1, as the maintenance contract is being rebid with new capabilities including hydro excavation. Edwards Park Pump Station: New pumps ($456,000) are awaiting final component deliveries for installation ahead of peak hurricane season. A future generator project, designed to be elevated and visually unobtrusive, will complete the pump station revitalization. Bridges, Docks, and Boardwalks: Mandatory bridge inspections were completed in Q4, with in-house and contracted repairs to follow in Q1. The David Simmons Boardwalk is nearing completion. A scope is being developed for full replacement of the Shem Creek boardwalks. Sidewalk Repairs: $134,000 in repairs was completed in Q4. $377,000 is allocated for Q1 sidewalk work in neighborhoods throughout Mount Pleasant. Town Facilities Maintenance (Townwide Fund): Q4 work included a sewer pipe assessment at the Town Hall gym, a review of the Darby Building, patio replacement at the old village library, and new fencing at the Whipple Road Tennis facility recycling point. Q1 planned work includes the Town Hall gym sewer pipe replacement, Darby Building repairs, Park West pool roof replacement, repaving and recurbing at Alhambra Hall and Edwards Park parking lots, and fire alarm panel work at Fire Station 3. Landscaping and Right-of-Way Maintenance: Q4 work included landscaping replacement at Veterans Circle, work at Children's Circle, and town-wide mulch and pine straw installation. Q1 work will include the Highway 17 landscaping project (progressing through SCDOT permitting), median work on Whipple Road near Long Point, and tree pruning on South Morgans Point. Field Renovations: Work is underway on new lighting at the batting cages at the Jones Center, replacement of lights at Sloan Park, and field renovations at Moultrie Field in coordination with Charleston County School District (CCSD) per the existing MOU, with CCSD contractors utilized to ensure completion prior to the start of the school year. Street Sign Replacement: Area 15 (west of Highway 41) was completed in Q4. Work on Area 14 is ongoing. Most of the town will have been completed upon its conclusion, with a few remaining areas in the Park West and Carolina Park neighborhoods and the Old Village excepted due to the obelisk-style signs in that area. Town Hall and Gym Generators: A $1,300,000 project to replace the Town Hall's partial-building generator with a full-building generator is nearly complete. The former generator was relocated to the Town Hall gym to provide backup power for potential storm shelter or personnel billeting use. Sanitary Sewer Pump Station: Mount Pleasant Waterworks (MPW) identified necessary equipment upgrades, which the town funded. MPW performed the work and will assume the maintenance agreement going forward. Council Member Alex Crosby inquired about the process by which residents can get infrastructure issues added to the project list. Director Weis explained that all reported issues are investigated and prioritized based on safety, condition severity, and available budget. He noted that engineering criteria are applied to determine sequencing and that some projects, particularly those requiring permitting or detailed design, may take considerable time. The Chair added that the communications department plays an important role in keeping residents informed about upcoming work in their neighborhoods, and that the quarterly presentation format itself is intended to provide public transparency regarding what projects are and are not currently scheduled. 7. Adjourn There being no further business, the Chair adjourned the meeting at 10:43 A.M. Respectfully submitted, Jason Boehm Town of Mount Pleasant Public services Administrative Division Chief Tuesday, July 7, 2026

Source: Town of Mount Pleasant website. First collected Oct 23, 2026.