_06252026-2211
Town of Mount Pleasant · Charleston County · meeting of Jun 25, 2026 · Minutes
Open the original document More from Town of Mount Pleasant
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
TREE TASK FORCE
Thursday, June 25, 2026
8:00 a.m.
Municipal Complex, Committee Meeting Room
100 Ann Edwards Lane, Mount Pleasant, SC 29464
MI
NUTES
Cl
ick here to listen to the recording
Discussion Topics
1. Call To Order
Chair McKee called the meeting to order at 8:00 AM. Michelle Mansour,
Deidre Kennedy, Edward Oswald, Shanna Harris and George Grice
were all present when the meeting convened. David Quick arrived at
8:02 a.m. Chair McKee noted that the approach for the session would be
to finalize all outstanding recommendations in preparation for the last
draft of the report, with the intent that at the July meeting the task force
would be prepared to formally accept the final report. He summarized
that the group would work through all open items remaining on the
recommendations list, beginning with the ordinance section, then
reviewing the overall recommendations, and then proceeding through
the document itself. Chair McKee noted that Dr. Stewart had helped
prepare for the session with Ms. Farrell's assistance. He proposed time-
boxing the first part of the meeting — the discussion on zoning
ordinances — to approximately thirty minutes, and asked Dr. Stewart to
serve as timekeeper.
2. Approval Of Agenda
Chair McKee called for a motion to approve the agenda.
Ms. Mansour moved to approve the agenda. Ms. Kennedy seconded
the motion. The motion carried unanimously.
3. Approval Of Minutes From May 21, 2026 Meeting
Chair McKee called for a motion to approve the minutes from the May
21, 2026 meeting.
Ms. Mansour moved to approve the minutes. Ms. Kennedy
seconded the motion. The motion carried unanimously.
Tree Task Force
June 25, 2026
Page 2 of 23
4. Public Comment
[None]
5. Work Plan TTF 2026 Work Plan
5a. Continued Review And Discussion Of Tree Protection Zoning
Ordinances And Policies (Single Family Residential)
Chair McKee opened discussion on the zoning ordinance
recommendations, providing an overview of the items that had already
received general agreement from the task force and identifying the areas
requiring further deliberation and decision. He proceeded through each
item in sequence.
Chair McKee noted that the task force had previously reached general
agreement on providing additional detail in the ordinance regarding
encroachment into tree protection zones, to be supported by a more
detailed arborist report. He asked whether any members had remaining
questions or concerns. No objections were raised, and the group
confirmed consensus on this item.
Chair McKee summarized the proposal to reduce the minimum caliper
for mitigation trees from two and one half inches to one and one half
inches, explaining that the intent was to make it easier for individual
homeowners who are removing a tree to plant a replacement. The group
Updated with notes from May meeting
• Tree Protection Zone- allow flexibility/ reduction of 20 to 25%. Protection plan from arborist for
construction period. Agreement
• Reduce minimum caliper for mitigation trees to 1.5 inches. Agreement
• Tree mitigation for single family nonconstruction- revise to 1 to 1 tree placement rather than
inches when required. General Agreement: For single family non-construction only, without tree
bank mitigation, and including Class III trees SEE SLIDE FOR ADDITIONAL DISCUSSION
• Develop minimum tree density standard for plantings on single family lots involving construction
General Agreement: For single family construction only- 160 inches/ acre or 20 trees/ acre SEE
SLIDE FOR ADDITIONAL DISCUSSION
• Reduce classification of laurel oaks (water oaks remain as is) Agreement
• Allow photo evidence of dead treesand photo as proof of planting (policy not
ordinance) Agreement for single family nonconstruction with option to still have a site visit or
require an arborist report
• Clarify ordinance language and fines for pruning, construction violations in the TPZSupport for
staff to proceed with developing language with legal staff
• Streamline ordinance language for capital projectsSupport for staff to proceed with no
substantive changes to the current ordinance
Summary: Staff Recommendations
Tree Task Force
June 25, 2026
Page 3 of 23
indicated no objection, and discussion of the specific scope of this
reduction was deferred to a later portion of the meeting.
Chair McKee introduced the proposal to simplify the mitigation process
for single family nonconstruction cases — meaning cases where a
homeowner is simply removing a tree, not as part of a permitted
construction project — by replacing the complex mitigation formula and
percentage calculations with a straightforward one-to-one tree
replacement requirement. He noted that this recommendation had
received significant input from staff regarding the resource-intensive
nature of the current process.
Chair McKee described the proposal to establish a minimum tree density
standard for single family lots where construction is occurring, noting
that this standard does not currently exist for this category of property,
though it does exist for commercial construction and subdivisions. He
noted the density would be set at one hundred sixty inches per acre or
twenty trees per acre.
Mr. Quick asked staff what the average lot size in Mount Pleasant would
be, so the group could better understand the practical implications of the
per-acre standard. Assistant Town Administrator Farrell responded that,
on average across the town, lot sizes are in the range of approximately
eight thousand square feet, which is roughly a quarter acre. She noted
that this was typical of areas such as the Old Village, Park West, and
Continued Discussion: Tree Density
Develop minimum tree density standard for plantings on single
family lots involving construction General Agreement: For single
family construction only- 160 inches/ acre or 20 trees/ acre
• If tree density is met, no replacement?
• Should lots that have less than the tree density be required to
plant to meet the minimum density?
• Density still required for dead and dying or hazardous trees?
• Removal of trees above 24 inches must be mitigated above the
density?
• 24 inch above go to BOZA regardless of density? What about 16
inch if that is changed?
• Is payment to the mitigation bank allowed in lieu ?
• What defines a tree for the purposes of calculating density (size,
species, understory)?
Tree Task Force
June 25, 2026
Page 4 of 23
Rivertown, where lots generally range from approximately six thousand
to nine thousand square feet.
Mr. Quick calculated that on a quarter-acre lot, the standard would
translate to approximately forty inches or five trees. Assistant Town
Administrator Farrell acknowledged that this is not a large number in
isolation but emphasized that this is already the standard applied to
commercial and multifamily properties, and that the proposal would
make the standard consistent. She referenced a recent public comment
from a resident who had expressed frustration that homeowners with
many trees faced additional mitigation requirements while others could
simply plant to reach a maximum, suggesting the consistency argument
had resonance in the community.
Director Reed added that the town already requires one hundred sixty
inches per acre for any residential subdivision of land and that,
historically, it had not always been possible to track whether that density
was preserved once subdivision lots were built out. She stated that
applying the standard at the lot-construction phase made logical sense
as a complement to the subdivision requirement.
Ms. Kennedy raised the question of what counts as a tree for the
purposes of calculating the minimum density — specifically, the
minimum size and whether invasive species would be included. Senior
Planner Lubert explained that the existing ordinance defines a tree, for
purposes of tree protection, as any species that grows to meet a
potential canopy of thirty feet or greater at maturity, explicitly excluding
palms and understory species such as crape myrtles.
Mr. Quick raised the question of whether invasive species would count
toward the density minimum, noting that invasives still provide some
ecosystem benefits such as shade and flood mitigation. Senior Planner
Lubert clarified that under the current code, invasive species are
required to be removed during commercial development and do not
count toward the density for commercial properties.
Assistant Town Administrator Farrell expressed concern about applying
that same exclusion rigidly to small residential lots, noting the cost to
homeowners of removing invasive trees and the practical complexity of
telling a homeowner on a seven-thousand-square-foot lot that they
cannot count a tree that is providing shade and reducing stormwater
runoff. She noted the potential for the situation to feel punitive and
expressed concern about the policy creating appeals to the Board of
Zoning Appeals or litigation.
Tree Task Force
June 25, 2026
Page 5 of 23
Mr. Quick noted that there was already an existing nonconforming
provision in the code — where if a project does not exceed fifty percent
of the assessed value of the improvement, the property does not need to
be brought entirely into code compliance. Director Reed confirmed this
and explained that this threshold applies to all zoning provisions,
including trees, setbacks, and flood regulations. She noted that every
case and project is different and that staff already routinely performs this
analysis when evaluating building permits.
The group reached consensus that the current ordinance definition of a
tree — anything that is a tree and not an invasive species — would be
used as the basis for the density standard without modification, and that
the existing nonconforming language would provide the necessary
flexibility for smaller projects.
Ms. Kennedy asked whether all of the additional questions on the slide
needed to be resolved. Assistant Town Administrator Farrell indicated
that she and Chair McKee had previously discussed that the task force
does not need to resolve every implementation detail today; rather, staff
needs good guidance from the task force, after which staff will draft the
ordinance language. She noted that even after the ordinance is drafted,
there may be unforeseen issues, but that the process allows for iteration.
She also suggested that the task force, when presenting its report to
Town Council, should request the opportunity for one workshop after
staff has prepared the ordinance draft, in order to ensure alignment
before the formal planning commission and public hearing process
begins.
Assistant Town Administrator Farrell raised the practical question of
what happens when a homeowner wants to remove a significant tree —
she used the example of a property owner who is at two hundred inches
of canopy on a quarter-acre lot and wishes to remove a twenty-eight-
inch red oak, which is the only tree keeping them from meeting the
density maximum. She noted that under the current commercial
framework, the removal of a twenty-four-inch tree requires mitigation
above and beyond the minimum density, and that twenty-four-inch trees
in commercial contexts are reviewed by the Design Review Board. She
asked the group to consider whether the same structure should apply to
single family residential.
Tree Task Force
June 25, 2026
Page 6 of 23
Chair McKee indicated his view that the same rationale applied — a
twenty-four-inch or larger tree in good or fair condition on a single family
lot should be required to go to the Board of Zoning Appeals for approval.
He noted that any mitigation for such a tree would be on top of, and not
in lieu of, meeting the density minimum. He clarified that the mitigation
table as it currently exists for commercial properties would remain in
place for these cases, and that this framework applies specifically to the
construction scenario.
Ms. Kennedy asked whether the intent was to increase the mitigation
fees. Chair McKee clarified that the task force had not, as a group,
agreed to increase the fee; the only fee-related discussions had
concerned Laurel Oaks and Water Oaks. He confirmed that the current
mitigation table would stay in place for the construction scenario, while
the one-to-one replacement would govern the nonconstruction scenario.
The group confirmed agreement that if the minimum tree density is met,
no replacement is required, and that if a lot is below the density
minimum and construction is occurring, planting to meet the minimum is
required. Assistant Town Administrator Farrell sought clarification on
whether the density requirement applies to all construction or only to
projects meeting the fifty-percent-of-value threshold. Director Reed
explained that the determination is made case by case, based on the
fifty-percent threshold already used for all other code provisions, and
that there is no straightforward rule because every lot, every project, and
every situation is different. The group accepted this as sufficient
guidance for staff to draft appropriate language.
Tree Task Force
June 25, 2026
Page 7 of 23
Assistant Town Administrator Farrell moved to the slide on one-to-one
replacement for the nonconstruction scenario. She noted that several
questions had already been addressed in earlier discussion and turned
to a specific question: would one-to-one replacement apply to class four
trees? The group confirmed agreement that class four trees — which
includes invasive species — would not require replacement. No
objection was raised.
Assistant Town Administrator Farrell then raised the question of whether
one-to-one replacement would apply to dead or hazardous trees. She
noted that the existing ordinance excludes dead and hazardous trees
from replacement requirements. Ms. Kennedy and others expressed
support for requiring replacement even for dead trees, observing that the
location of a dead tree is often a good location for a new tree, and that
the cost of replacement under the new framework is modest given the
reduced minimum size of one and one half inches.
Mr. Oswald raised the concern that if a storm comes through and many
trees are lost, requiring replacement for all of them could be
burdensome. Chair McKee and others acknowledged that there would
be natural disaster exceptions. Ms. Mansour observed that there is no
mitigation formula involved — just a straightforward replacement — and
that the cost of a one-and-one-half-inch replacement tree is minimal,
noting that trees are available at giveaways for as little as twenty dollars.
Chair McKee summarized the emerging consensus as: for class one
through three trees, regardless of condition — including dead and
hazardous trees — removal requires a one-to-one replacement, and
there is no longer a mitigation table or fee for nonconstruction single
family cases. He asked whether everyone was in agreement, and the
group confirmed consensus, with some members acknowledging that
this would likely generate public pushback but expressing the view that it
was the right policy.
Public Services Director Weis raised an important infrastructure concern:
throughout this discussion about tree density and replacement planting,
he noted that residential homeowners tend to want to plant trees along
the edges of their properties, which is often where drainage easements,
pipes, and rights of way are located. He expressed concern that trees
planted near infrastructure would eventually need to be removed when
pipe repairs are needed or when root systems damage sidewalks and
infrastructure, thereby undermining the long-term canopy goals. He
noted that mature trees above twenty feet need to be set back a certain
Tree Task Force
June 25, 2026
Page 8 of 23
distance from infrastructure, and asked that this consideration be
incorporated into the ordinance or replanting plan requirements.
Senior Planner Lubert noted that a replanting plan is already required
under the current process, and that when reviewing such a plan, staff is
able to overlay easement maps and flag prohibited locations. Chair
McKee acknowledged that the specific setback distances from
infrastructure get into a level of implementation detail that could be
addressed as a language clarification in the replanting application, rather
than a specific recommendation requiring further deliberation.
The group agreed that the existing replanting plan review process,
combined with language clarifications in the application requirements,
would adequately address Director Weis's concern. Director Weis's point
was acknowledged as important for the long-term success of the canopy
program.
Chair McKee noted that the proposal to move Laurel Oaks down one
classification level — to the same tier as Water Oaks, in recognition of
their shorter lifespan — had previously received general agreement. He
noted that this change also reduces the complexity and potential for
disputes about mitigation amounts, particularly given the shift to one-to-
one replacement. No objection was raised.
Chair McKee introduced the topic of whether to reclassify or increase
protections for pine trees, specifically to distinguish between Loblolly
Pines and Longleaf Pines. Assistant Town Administrator Farrell noted
Additional Items for Discussion
• Reclassifying/ Increasing Protection for Pine Trees
• Current ordinances require that removal of Pine trees above 24 inches
and in good or fair condition must be approved by BOZA . Pines less than
24 inches may be removed without mitigation .
• Increasing protection levels on trees less than 24 inches on
single family properties (require variance approval for 16 inch
up?)
• Current ordinances allow trees less than 24 inches to be removed with
staff level approval and mitigated , regardless of condition.
• BOZA approval required for trees greater than 24 inches
Tree Task Force
June 25, 2026
Page 9 of 23
that the protection of pine trees generates the most complaints she
hears from the public.
The discussion that followed centered on the difficulty of distinguishing
between Loblolly and Longleaf Pines in the field and the enforcement
challenges associated with that distinction. Senior Planner Lubert
explained that the live crown ratio of most Loblolly Pines — that is, the
proportion of the trunk with living crown — frequently falls below fifty
percent, which by definition places most Loblolly Pines in class four
under the current ordinance, meaning they effectively do not require
replacement in most cases. Longleaf Pines, by contrast, are far rarer
and more ecologically significant.
Senior Planner Lubert cautioned that if Loblolly Pines were explicitly
exempted from protection, and a Loblolly Pine were removed without a
permit, it would be extremely difficult to cite the homeowner because the
inspector would need to visually confirm with certainty that the removed
tree was a Loblolly and not a Longleaf, without a stump or needles
remaining as evidence. He noted that for this reason, it had been easier
during the most recent ordinance update to simply protect all pines
above a certain size threshold.
Mr. Quick observed that he had watched Great Blue Herons and White
Egrets nesting in Loblolly Pine trees at a nearby apartment complex
throughout the spring, emphasizing that even Loblolly Pines provide
valuable habitat. Assistant Town Administrator Farrell noted that
historically pines were protected, then became unprotected, and were
more recently given back protection at the twenty-four-inch threshold.
She acknowledged that staff had initially been concerned about the re-
addition of pine protections but had been pleasantly surprised that it had
not generated as many conflicts as feared.
The group discussed whether to apply the arborist report requirement so
that the species could be identified and confirmed at the time of permit
application, with the report indicating whether a tree is a Loblolly or a
Longleaf. Senior Planner Lubert noted that having the arborist report
would help, but that the enforcement challenge of confirming the species
after the fact — if a tree was removed without a permit — remains
difficult regardless.
Mr. Oswald noted that going from a general pine protection to a
Longleaf-specific protection would not meaningfully move the needle in
terms of tree protection outcomes, given that Longleaf Pines constitute a
very small percentage of the pines in Mount Pleasant. He indicated his
Tree Task Force
June 25, 2026
Page 10 of 23
preference for leaving the current ordinance as is rather than making a
change.
The group reached the consensus to make no recommendation for
changes to the current pine tree protections, leaving the existing
framework in place and moving on.
This section of the meeting generated the most extensive and
substantive debate of the session. The central question before the task
Additional Items for Discussion
• Reclassifying/ Increasing Protection for Pine Trees
• Current ordinances require that removal of Pine trees above 24 inches
and in good or fair condition must be approved by BOZA . Pines less than
24 inches may be removed without mitigation .
• Increasing protection levels on trees less than 24 inches on
single family properties (require variance approval for 16 inch
up?)
• Current ordinances allow trees less than 24 inches to be removed with
staff level approval and mitigated , regardless of condition.
• BOZA approval required for trees greater than 24 inches
• Current ordinances allow trees
less than 24 inches to be removed
with staff level approval and
mitigated, regardless of condition.
(E) Detached house lots .
(1) On individually platted lots for /with detached house dwellings , the
following criteria shall be used to evaluate requests for the removal of historic
and significant trees :
(a) The tree location in relation to property boundaries , infrastructure,
existing physical features ;
(b) The condition of the canopy , overall health, and species;
(c) The nature of the request , justification, and reason for removing the
tree; and
(d) Whether practical alternatives have been vetted to preserve the tree .
(2) Removal of Category I or II historic trees or pine trees greater than 24
inches DBH classified as ‘good’ or ‘fair’ shall be decided by the Board of Zoning
Appeals,
• BOZA requirements
• 156.1296 REVIEW CRITERIA .
• (A) The Board may grant a variance in an individual case of unnecessary
hardship, if the Board makes and explains, in writing, all of the following
findings:
• (1) There are extraordinary and exceptional conditions pertaining to the
particular pieceof property;
• (2) These conditions do not generally apply to other property in the
vicinity;
• (3) Because of these conditions, the application of the code to the
particular pieceof property would effectively prohibit or unreasonably restrict
the utilization of the property; and
• (4) The authorization of a variance will not be of substantial detriment to
adjacent property or to the public good, and the character of the district will
not be harmed by the granting of the variance.
• (B) The Board shall not grant a variance, the effect of which would be to:
• (1) Allow the establishment of a use not otherwise permitted in a zoning
district;
• (2) Extend physically a nonconforming use of land; or
• (3) Change the zoning district boundaries shown on the Zoning Map.
• (C) The fact that property may be utilized more profitably if a variance is
granted shall not be considered grounds for a variance
Increasing Protection Levels on Trees less than 24 inches
Tree Task Force
June 25, 2026
Page 11 of 23
force was whether to lower the threshold for trees requiring Board of
Zoning Appeals approval from twenty-four inches to sixteen inches in
diameter at breast height, specifically for class one and class two trees
in good or fair condition.
Chair McKee provided context, noting that in 2025 data, only twelve of
three hundred ninety-one trees that came through the planning process
were in class one or class two — that is, in good or fair condition — at
the twenty-four-inch-and-above threshold. He noted that this is a small
but significant subset: these are the best trees, the ones with full canopy
and healthy structure. He observed that under the current system, when
staff receives a request to remove one of these trees, staff effectively
approves the removal as long as mitigation is offered, because the
ordinance language does not provide sufficient authority to deny the
application. If staff does attempt to deny, the applicant simply appeals to
the Board of Zoning Appeals, and the Board is constrained by state
statute to apply a hardship standard that has historically been
interpreted strictly by the current board composition.
Chair McKee presented the binary choice facing the task force: leave the
threshold at twenty-four inches, with the current framework in which staff
processes removals and approval is effectively automatic with mitigation;
or lower the threshold to sixteen inches, which would direct more trees
into a public body review process but would subject those decisions to
the same strict hardship standard applied by the current Board of Zoning
Appeals.
He noted that in other municipalities he had reviewed, trees of
significance are typically reviewed by a dedicated tree board rather than
a Board of Zoning Appeals, because a tree board is an advisory rather
than quasi-judicial body and can apply different, more flexible criteria.
Ms. Harris expressed concern about the rigidity of the hardship standard
at the Board of Zoning Appeals, asking whether the language was
ambiguous enough to allow for flexible interpretation and whether there
were provisions for reasonable land use. She gave the example of a
homeowner on a quarter-acre lot with a small house who wants to add a
room for a baby and is told they cannot remove any of the twelve
sixteen-inch trees in their backyard. She expressed the view that there
has to be a pathway through the system that makes sense for property
owners without simply opening the door to unconstrained removal.
Assistant Town Administrator Farrell confirmed that the hardship
standard is set by state statute and that while it can theoretically be
interpreted flexibly, the current composition of the Board of Zoning
Tree Task Force
June 25, 2026
Page 12 of 23
Appeals has been significantly more strict than previous boards. She
acknowledged that prior boards had approved removals that the current
board would likely deny, but that the town does not control how the
board weighs the statutory criteria. She also noted that the town has
ended up in court and mediation on a number of tree-related appeals.
Director Reed observed that what might ultimately protect trees in the
sixteen-to-twenty-four-inch range is not necessarily lowering the
threshold for Board of Zoning Appeals review, but rather the cumulative
effect of the other recommendations being made — particularly the
minimum tree density requirement, which creates a financial incentive
for property owners to preserve trees on their lots rather than remove
them and be required to plant to meet the minimum. She also noted that
the proposed flexibility in the tree protection zone encroachment
language may reduce the number of cases where property owners feel
they have no choice but to remove a tree.
Assistant Town Administrator Farrell echoed this point, adding that the
previous doubling of the tree protection zone had caused some property
owners to simply remove trees because the zone made construction
impossible to work around. The new flexibility being proposed for the
tree protection zone might, in her view, reduce the frequency of removal
requests in that size range.
Mr. Quick raised the concern that if the canopy survey comes back
showing Mount Pleasant already has forty-six percent canopy coverage,
there might be a temptation for Council to conclude that tree policy does
not need to be strengthened. He argued that regardless of the
percentage, the town should be ensuring the future generation of the
canopy by getting trees in the ground now, particularly in anticipation of
storms and continued development pressure.
Ms. Mansour stated clearly that she is in favor of moving the threshold to
sixteen inches. Ms. Harris expressed support as well, though with the
caveat that the group should think carefully about how to provide a
workable pathway through the approval process, particularly for property
owners who are dramatically over the density minimum. Several
commissioners observed that most municipalities they had studied
during their research set the threshold at sixteen inches rather than
twenty-four.
Mr. Oswald expressed skepticism, noting that he was not convinced that
large numbers of sixteen-to-twenty-four-inch trees were being lost under
the current regime, and warning that lowering the threshold could
Tree Task Force
June 25, 2026
Page 13 of 23
significantly increase the workload on staff and could increase the
likelihood of litigation.
Senior Planner Lubert acknowledged that if the threshold were lowered,
it would be very difficult to enforce violations in the sixteen-to-twenty-
four-inch range in practice, because confirming the identity and class of
a tree after the fact — if removed without a permit — requires physical
evidence. He noted that enforcement would remain reactive rather than
proactive regardless.
Dr. Stewart called attention to the time and urged the group to move
toward a decision if they wished to reach the report review portion of the
agenda.
Chair McKee proposed that the group take a vote on whether to include
in the report a recommendation to send sixteen-inch class one and class
two trees to the Board of Zoning Appeals for approval.
Those opposed to the recommendation — Mr. Oswald and Mr. Grice
indicated their opposition. The remaining members who voted were in
favor, with Ms. Harris expressing support while noting the need for a
workable exception pathway. The group agreed that the
recommendation would be included in the report, while acknowledging
that it would ultimately be Town Council that makes the final policy
decision through the public process, and that Council might choose a
different threshold entirely, might choose to establish a tree board, or
might table the issue.
Chair McKee briefly reviewed several additional items on which the task
force had previously reached agreement. These included: supporting the
staff recommendation to allow photographic evidence in mitigation
decisions, which would reduce the need for site visits; clarifying the
ordinance language for construction violations; and updating the
language related to capital projects, which had been left in a holding
pattern.
6. Review And Discussion Of Draft Final Report And
Recommendations
Chair McKee transitioned the meeting to a review of the printed draft
final report. He proposed an organizational framework for the document,
noting that the executive summary, goal and purpose, and assessment
of existing programs sections appeared to be in reasonable shape, but
that several highlighted sections required group decisions before the
document could go to a final draft.
Tree Task Force
June 25, 2026
Page 14 of 23
Draft Report Recommendations
• Establish a long-term canopy goal of 40% within 20 years.
• Develop a 20 year Tree Planting Plan that identifies specific planting areas ,
their priority , and the type and costs of planting that area . This would include
all land uses , not just Town owned land .
• Develop a Tree Scorecard /Dashboard /Urban Forest Tracking System to
continuously assess tree losses and gains for all the tree programs and tree
removal permitting processes (residential , commercial , and capital
improvements ).
• To achieve canopy objectives , establish a dedicated leadership role within the
Town’s organizational structure to oversee tree-related programs and
outcomes .
• To achieve canopy objectives , re-imagine existing programs to increase tree
planting volumes , engage the community at every opportunity , and seek
external sponsors and funding .
• Ensure sufficient budget to support the new Tree Leader position and tree
planting and canopy-related programs to achieve the canopy objective .
Draft Report Recommendations
• Explore grants , sponsorships , and public private partnership opportunities to
leverage Town funding to focus on education and planting programs to
encourage private tree planting .
• Set aside a portion of the funds for tree-related financial support programs to
ensure tree benefits are available to all .
• Provide detailed encroachment options for the Tree Protection Zones to
enable more flexible site use for development without tree removal
• Reduce minimum tree size for mitigation replacement from 2.5” to 1.5” for
residential non construction tree removal permits for easier planting by
residents themselves and better long term survivability of the replacement
tree.
• Implement 160”/acre AND 20 trees /acre as the minimum tree cover for
Residential lots seeking construction permits with tree removals .
• Simplify mitigation for tree removal permits for Existing Residential Non
Construction homeowners to one for one replacement , eliminating the
complicated inches and mitigation percent by tree category and health rating .
For this one category of Land Use , the mitigation is simply “Remove a Tree-
Replace the Tree .
Tree Task Force
June 25, 2026
Page 15 of 23
Chair McKee asked the group whether the list of what is working had
been fairly captured. The list included items such as the forest
management plan, organized processes, engaged and positive staff,
stronger tree protections in the new ordinance, the GIS team's data
capabilities, and town funding. No members identified items that were
missing or inaccurate.
Chair McKee turned to the list of what is not working, noting that this is
the section observers will scrutinize most closely. The current list
included: no established canopy goal; lack of data about outcomes and
net tracking across processes; fragmented responsibility across multiple
departments; underutilized tree programs; a budget that is insufficient to
support the stated goal; mitigation planting rarely being chosen by
property owners; an overly resource-intensive permitting process for
nonconstruction cases; and trees ultimately not being replaced.
Chair McKee noted that items five and seven on the list were somewhat
duplicative and might warrant consolidation.
Ms. Kennedy proposed adding a reference to enforcement challenges —
specifically, the lack of proactive enforcement of the ordinance during
construction, including situations where contractors enter tree protection
zones without proper protection in place, damage roots, and face no
meaningful consequences. She described a personal experience in
which a neighbor had dug a plumbing trench inside her protected trees'
protection zone without having tree protection barriers installed,
Draft Report Recommendations
• Make the Category III tree Declining Health not zero so that a replacement
tree is planted or mitigated when a tree is removed for Category 1 through 3
in Good , Fair and Declining conditions .
• Support the process simplification of staff accepting photographic evidence
from owners of type , condition or tree being removed and for proof of
replacement .
• Reclassify Laurel Oaks as Category III trees .
• One of the responsibilities of the Tree Leader would be to coordinate with the
Public Services department to create the proactive public tree maintenance
plan as a complement to the overall Planting Plan .
• Support staff input for wording changes to the ordinance to clarify pruning
and maintenance requirements , capital project requirements like fiber and
other utilities , and language to support enforcement and penalties .
• Permitting Processes ?
• Education , Outreach, Partnerships?
Tree Task Force
June 25, 2026
Page 16 of 23
damaging fifty percent of the root systems of six trees, with no effective
remedy available to her.
Senior Planner Lubert acknowledged the difficulty of enforcement, noting
that while staff can issue stop work orders and write tickets, defining the
extent of damage caused to a tree's root system is extremely
challenging from an evidentiary standpoint. He noted one recent case in
Old Mount Pleasant where a property owner was taken to court and
required to implement remedial procedures. He also acknowledged that
with only two code inspectors who are primarily reviewing plans and
conducting scheduled inspections, proactive surveillance of active
construction sites is not feasible.
Assistant Town Administrator Farrell pointed out that the earlier work
summary slide already included a recommendation to clarify ordinance
language and fines for pruning and construction violations within tree
protection zones, and that this finding in the assessment section should
be aligned with that recommendation later in the document.
Dr. Stewart suggested that, given general agreement, the group allow
Chair McKee and staff to draft appropriate language on the enforcement
point for inclusion in the final document, to be reviewed at the next
meeting. The group agreed.
Chair McKee presented the recommendation for a long-term canopy
goal. He noted that the Community Forest Master Plan had established
that a two percent increase in canopy coverage would require
approximately twenty thousand trees. He noted, however, that since the
2019 data on which that plan was based, the town had experienced
significant canopy loss through major capital projects — he estimated
that two projects alone may have resulted in the loss of approximately
five thousand trees — and proposed that the planting target be set
higher, in the range of thirty thousand trees, or approximately one
thousand five hundred trees per year over a twenty-year period.
Mr. Quick raised a concern about relying on a specific percentage target
such as forty percent, noting that the ongoing canopy survey might
return results showing that the town is already at or above forty percent
canopy coverage when areas such as Laurel Hill and the marshlands
are included in the calculation. He expressed concern that if the town is
shown to already be at forty-six percent, some might argue there is no
tree problem and no need for increased planting. He suggested that the
number of trees planted annually might be a more durable and politically
defensible metric than a percentage target.
Tree Task Force
June 25, 2026
Page 17 of 23
Assistant Town Administrator Farrell indicated that the canopy survey
data coming in was looking stronger than expected — that the town
might not be as far behind as previously feared — but that many
variables affect what is counted and that the numbers vary significantly
depending on methodology and what land is included.
Chair McKee summarized the discussion by proposing to take the
specific percentage target out of the recommendation language and
instead frame the goal as a net annual planting target of approximately
one thousand five hundred trees per year over twenty years, with
supporting background data explaining how that number relates to
historical canopy data. He noted that the report would include reference
to the 2019 data, that the marsh would be excluded from the baseline to
allow for consistent comparison, and that the background would
acknowledge the gap between different methodologies.
Mr. Oswald raised the philosophical question of whether there is a
theoretical maximum canopy percentage the town could realistically
achieve given the amount of developed and developing land. Others
noted that this is a natural limiting factor that would be addressed in due
course, and that reaching such a constraint would be a wonderful
problem to have.
The group confirmed consensus on setting the net annual planting goal
at one thousand five hundred trees per year, framed as a twenty-year
target of approximately thirty thousand trees, with the specific
percentage language to be softened or removed in favor of a relative
increase goal from the 2019 baseline.
Chair McKee described the recommendation to develop a tree
dashboard — a public-facing tracking tool that would measure the net
gain or loss of trees across all processes, with a target of showing a net
gain of approximately one thousand five hundred trees annually. Ms.
Harris asked whether the dashboard would be visible on the town's
website so that residents could monitor progress. Chair McKee
confirmed that was the intent.
Ms. Kennedy proposed that the dashboard also track the type or
category of trees being removed and replaced — similar to the
breakdown used in the Community Forest Master Plan — rather than
simply tracking total numbers. Mr. Quick expressed support for the idea
but noted that it should only be pursued if it is operationally feasible
given staff capacity. Director Reed indicated that the new tree leadership
position being recommended would be instrumental in developing and
maintaining such a system.
Tree Task Force
June 25, 2026
Page 18 of 23
The group agreed to include the category-level tracking as a suggestion
in the dashboard recommendation, subject to feasibility.
Chair McKee asked the group about the timing of dashboard reporting.
He noted that the draft had originally proposed quarterly reporting to the
Flood Resilience Committee but that quarterly might be too burdensome
for the level of data assembly involved, and proposed semi-annual
reporting to Flood Resilience and annual reporting to Town Council, with
a canopy assessment update every five years. The group agreed to
semi-annual reporting as the recommendation.
Chair McKee introduced the recommendation for a new dedicated
leadership position within the executive branch to coordinate the town's
tree programs. Mr. Quick asked for clarification on whether this meant a
dedicated staff member — a new position — or simply a leadership role
assigned to an existing person. Chair McKee confirmed it meant a new,
dedicated position, and agreed to update the language to make that
explicit.
The group reviewed the list of responsibilities described for the new
position. Director Weis suggested adding tree maintenance to the list of
responsibilities, noting that planting trees is only valuable if they are
properly cared for afterward. Director Reed proposed that the first bullet
point be amended to describe the position as responsible for designing
the tree planting and maintenance plan, which would encompass both
activities in one phrase. The group agreed to this language change.
Chair McKee addressed a question that had arisen during drafting about
whether this new tree leader would have decision-making authority in
the zoning process — that is, whether they would take over the role of
the zoning administrator in approving or denying tree permits. He was
explicit that the task force was not recommending that. Director Reed
clarified that the zoning administrator already designates certified
arborists as decision-makers on tree permit applications, so experts are
already embedded in that process. The new position would be focused
on program coordination, canopy planning, inter-departmental
communication, and overseeing planting and maintenance — not on
replacing the existing permitting authority.
Ms. Kennedy asked why, if someone with deep tree expertise was being
hired, they could not also make tree-related permitting decisions.
Director Reed and Assistant Town Administrator Farrell clarified that the
scope of work for the new position — coordinating all of the programs,
planting, maintenance, and reporting — would be a full-time
responsibility in itself and that adding a permitting decision-making role
Tree Task Force
June 25, 2026
Page 19 of 23
would effectively double the position's workload in ways that would be
unmanageable.
Chair McKee described the existing structure of this section, which lists
program ideas drawn from examples seen in other municipalities,
organized around three themes: planning proactively, celebrating
success and fundraising through events, and engaging the community at
the neighborhood level. He noted that the list of references to other
municipalities' programs had been included in the body of the report to
support the suggestions but asked the group whether these examples
should be moved to an appendix to keep the body of the report more
focused for its primary audience — Town Council.
Dr. Stewart observed that material in an appendix is typically reference
material for those who wish to go deeper, while the body of the report is
where the key conclusions and recommendations should live. She
noted, without making an explicit recommendation, that the audience is
Town Council, and that councillors tend to respond better to focused,
concise documents.
Mr. Quick expressed agreement with the implicit suggestion, noting that
people do not like to read very long documents, and stated his
preference for moving the detailed program references to an appendix
while keeping one example per recommendation theme in the body. Ms.
Mansour agreed, suggesting that pages fifteen and sixteen of the current
draft could essentially become an appendix. The group reached
consensus that the program references would be moved to the
appendix, with the body retaining the recommendations and one
illustrative example per theme.
Chair McKee noted that the task force had softened the funding
language at the previous meeting, moving away from very specific dollar
amounts to a more general recommendation for sufficient funding. He
noted that the report now lists three example areas for implementation
on page eighteen and leaves it to Council to determine the mechanism.
He asked whether the group was comfortable with this approach. The
group confirmed comfort with the approach, and no changes were
requested.
Chair McKee raised the question of whether the equitable access
recommendation should be embedded within the funding section or
elevated to its own standalone section. Ms. Mansour expressed the view
that it should remain its own section, emphasizing that it is a policy
statement, not merely a funding note. The group agreed.
Tree Task Force
June 25, 2026
Page 20 of 23
Chair McKee walked through the ordinance recommendations section,
noting that the discussion in the first portion of the meeting had added
clarity on several items that would now be incorporated.
He reviewed the tree protection zone recommendation, confirming that it
would add flexibility by providing detailed language, and described the
contents of the arborist report list as suggested specifics. Ms. Harris
noted that the arborist report should, at a minimum, document species,
size, health, percentage of root encroachment, canopy reduction, and
distance from the tree. She offered to review the specific language in
that section and provide suggested text for the next draft if anything
needed to be adjusted.
On the reduction of the minimum replacement tree size to one and one
half inches, Chair McKee proposed — and the group confirmed — that
this reduction in minimum size should apply only to the single family,
nonconstruction scenario, not to commercial properties or to
construction-related mitigation. He reasoned that the intent of reducing
the size was to make it easy and affordable for an individual homeowner
removing a tree under the simple nonconstruction process, not to reduce
requirements for contractors and developers who have the resources to
plant larger trees.
On the minimum tree canopy cover, Chair McKee confirmed that the
density requirement applies to single family residential construction
permits, using the existing class definitions and excluding invasive
species, consistent with the discussion earlier in the meeting.
On simplifying mitigation for single family nonconstruction, Chair McKee
confirmed that the recommendation eliminates the mitigation table for
this scenario and replaces it with a one-to-one replacement. Ms.
Kennedy raised the concern that this could create a loophole where a
homeowner removes a tree under the simple nonconstruction process
and then, six months later, applies for a construction permit — thereby
avoiding the stricter mitigation that would have applied had they gone
through the construction process initially.
Director Reed noted that in practice, the phone intake process — where
staff asks whether a removal is associated with planned construction —
catches most of these cases upfront, because most homeowners do not
know the difference between the two processes and accurately describe
their intentions when they call. She also acknowledged that there is no
completely foolproof way to track every mitigation tree planted under any
scenario, and that the density requirement for construction provides a
backstop in any case: if someone removes a tree under the
Tree Task Force
June 25, 2026
Page 21 of 23
nonconstruction process and then subsequently applies for a
construction permit, they will still be required to meet the minimum tree
density at the time of the construction permit, regardless of when the
tree was removed.
Ms. Harris observed that this backstop effectively addresses the
loophole concern — even if someone removes a tree six months before
starting construction, the construction permit trigger would require them
to plant to meet the density minimum. The group accepted this as
adequate protection.
Chair McKee raised a specific issue with the mitigation table as
proposed: currently, the mitigation percentage for class three —
declining condition — trees is zero, meaning no mitigation is required for
their removal. He proposed that this number should be nonzero, at least
as applied to commercial and residential construction scenarios, so that
there is some minimum mitigation obligation even for a declining tree.
He suggested ten percent as a reasonable nonzero figure.
Mr. Quick and others expressed agreement that something above zero
was appropriate, and the group confirmed that ten percent was a
reasonable and defensible starting point for class three tree mitigation,
to be applied in the commercial and construction contexts. Ms. Mansour
and others agreed.
Chair McKee noted that the maintenance strategies section describes
maintenance as a core function of the new tree leader position and the
coordination role with Public Services. He suggested framing this not as
a standalone recommendation but as a recognition that maintenance is
expected to be part of the new position's core responsibilities, with
coordination to be worked out with Public Services.
Ms. Mansour raised the idea of creating a maintenance brochure for the
public that would provide guidance on proper tree care. Chair McKee
suggested that this idea would be better placed in the education,
outreach, and partnerships section, as a recommended opportunity for
improvement. The group agreed to move it there.
Senior Planner Lubert noted that the town does currently have some
informational brochures on tree care that are provided to residents. Ms.
Mansour indicated that she had not been aware they were available and
suggested that the recommendation include hosting these brochures
prominently on the town's website for easier public access. Mr. Quick
agreed and asked that a copy of the current brochure be brought to the
Tree Task Force
June 25, 2026
Page 22 of 23
next meeting so the group could assess whether it needed updating.
Senior Planner Lubert agreed to do so.
Ms. Harris raised a new proposal near the end of the meeting: she
suggested that tree service companies, rather than individual
homeowners, should be the party responsible for applying for and
submitting tree removal permits — similar to the way licensed
contractors apply for building permits. She noted that in her own
experience, tree service companies that regularly work in a jurisdiction
adapt quickly to administrative requirements and that having them
handle permitting would eliminate a point of contact, reduce errors,
simplify tracking, and encourage more professional reporting. She
acknowledged that there would need to be an exception for homeowners
removing trees themselves.
Ms. Kennedy expressed immediate enthusiasm for the idea, describing it
as a significant simplification. Several other commissioners expressed
support. Ms. Mansour noted that some tree service companies currently
charge homeowners additional fees to submit permit applications on
their behalf — her own company had charged an additional one hundred
dollars — but suggested that if this became a standard requirement as
part of doing business, it would simply become part of their overhead
rather than a special charge.
Director Reed noted that the concept was appealing but that it had some
practical challenges. She observed that many homeowners call the town
before selecting a tree service, without yet having a contractor lined up,
and that staff would need to direct them to select a contractor first. She
also acknowledged that many homeowners currently pull their own
permits.
Mr. Quick raised the question of liability — specifically, if the tree service
pulls the permit and something goes wrong, whether the homeowner
would be insulated from responsibility. Ms. Harris clarified that the
homeowner's information would still be on the application, that the
homeowner would still receive all correspondence, and that both the
homeowner and the contractor are currently liable for work performed.
Current practice of both parties remaining responsible would continue.
An unidentified participant suggested that rather than mandating tree
service permitting, there might be ways to incentivize it or to make it a
standard expectation communicated to contractors through business
licensing, since it would need to be addressed carefully to avoid
unintended consequences.
Tree Task Force
June 25, 2026
Page 23 of 23
Chair McKee indicated that he would find a place to insert this concept
into the report recommendations and asked for the group's agreement to
include it. The group was generally supportive, and several participants
observed that this idea, if implemented, could significantly reduce staff
workload and improve compliance. Chair McKee agreed to incorporate it
and requested that the group reflect on the idea before the next meeting.
7. Discuss Next Agenda
Chair McKee described the agenda for the next meeting as a full review
of the final draft report, with the objective of making any last-minute
changes and voting to approve the document. He emphasized that
members need to read the draft before the meeting — not on the night
before — and send comments to him as early as possible so that
changes can be incorporated into the draft prior to the meeting, reducing
the amount of live editing required during the session. He described this
as crunch time for the task force.
8. Adjourn
Chair McKee asked whether any member had additional items to raise
before adjournment. No additional items were raised and the meeting
was adjourned at 10:07 a.m.
Respectfully submitted
Christine Barrett
Clerk of Council
June 25, 2026