TOWN OF MOUNT PLEASANT, SC
TRANSPORTATION COMMITTEE
Monday, June 1, 2026
1:15 p.m.
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
MINUTES
Members Present: Mayor Will Haynie, Howard Chapman, Mike Tinkey,
Kathryn Whitaker
Staff Present: Brad Morrison, Eric DeMoura, James Aton
Also Present: Chairman Joe Boykin, Charleston County Council
Devri DeToma, Deputy Director, Charleston County Public Works
Stuart Day, Stantec
Transportation Committee Presentation
Charleston County Highway 41 Corridor Improvements Project Update
Listen to the Transportation Committee Meeting Here
1. Call To Order
Mayor Haynie called the meeting to order at 1:36 p.m.
2. Approval of Minutes from the April 6, 2026 meeting
Mr. Chapman moved for approval of the minutes; motion seconded by Ms.
Whitaker. Motion carried unanimously.
3. Public Comments
Representative Kathy Landing, addressed the Committee regarding the
Highway 41 corridor project, thanking Mr. Tinkey for organizing a follow -up
stakeholder meeting. Representative Landing raised a persistent concern: if
the intersection of Bessemer Road/Joe Rouse at SC 41 is the primary reason
a 4-3-4 configuration fails without Laurel Hill Parkway, why not redesign that
Transportation Committee
June 1, 2026
Page 2 of 11
intersection to operate more efficiently, perhaps by starting the required
1,500-foot taper at a different point? Representative Landing also expressed
strong public opposition to the current plan, noting that Laurel Hill Parkway
would not divert traffic a way from the Phillips Community but would merely
serve as a bypass of Bessemer Road. Concern was also raised about the
addition of two new traffic signals along a corridor where the primary goal is
improved traffic flow.
Travis Corson, 3850 Bessemer Road , Chairman of Smart Growth 41 ,
representing over 3,500 members, urged the Committee to honor prior
commitments made to voters opposing Laurel Hill Parkway, including
previously stated willingness to withhold municipal consent. He argued that
the parkway has no bearing on whether a fourth lane through the corridor is
needed, as it functions only as a bypass of Bessemer Road, not of the
congested stretch of Highway 41. He echoed concerns about the two new
traffic signals and an additional ingress/egress point, questioning how these
additions would improve traffic efficiency. He called on the County to engage
more meaningfully with Mount Pleasant residents, stating that voluntary
compromise had not been achieved.
George Freeman, President of the CAGE Organization, 2347 Highway
17 North, presented a proposal for an extension of Billy Swails Boulevard to
Highway 17 as a parallel route to relieve congestion along that corridor,
particularly between Long Point Road and Porcher's Bluff. He suggested that
if Laurel Hill Parkway is not constru cted and funding becomes available, a
portion of the estimated $60 million could be redirected toward building this
alternative connector road within the Seven Mile community.
Patrick McAdams, 3069 Caspian Court , spoke to the daily concern
residents have about Laurel Hill Parkway, emphasizing safety for children in
the neighborhood. He stated that from his perspective, adding another road
through the area creates unnecessary danger without providing a meaningful
traffic benefit. He thanked the Town for listening to residents and expressed
that the lack of engagement from the County has left the community feeling
abandoned.
Perry Rourk, 2004 Brick Kiln Parkway , raised procedural concerns
regarding transparency. He stated that no specific proposal or
recommendation had been publicly disclosed in advance of the meeting,
Transportation Committee
June 1, 2026
Page 3 of 11
despite a potential vote being listed on the agenda. He argued that without
access to the specific action under consideration, residents cannot provide
meaningful public comment. He urged the Committee not to take any action
on Highway 41-related items until the proposal has been publicly disclosed
and residents have been given adequate time to review it and respond.
4. Follow-up discussion regarding the Porchers Preserve and SC 41
Corridor Project Design
Mr. Aton addressed a concern that was raised at the previous Transportation
Committee meeting on pedestrian access improvements for the Porcher's
Preserve neighborhood. Working in coordination with Charleston County and
their consultant, HDR, a dedicated high-visibility crosswalk with Rectangular
Rapid Flashing Beacon (RRFB) devices and a pedestrian refuge island
across Porcher's Bluff Road is proposed, providing residents safe access to
retail and facilities along South Morgans Point. The design is subject to final
approval by SCDOT, as the roadway falls within State jurisdiction. Mr. Aton
noted that the design would be similar to the crosswalk currently located on
Houston Northcutt Boulevard near Town Hall. He also noted that additional
pedestrian facilities will be provided at the Billy Swails Boulevard intersection
as part of the broader SC 41 widening project, and that the Kenny Mile Trail
will add further bike and pedestrian connectivity options.
Mr. Tinkey thanked both County and Town staff for their responsiveness to
neighborhood concerns. Mayor Haynie confirmed that the proposed solution
aligned with what the Porcher's Preserve HOA had requested. Ms. Whitaker
noted that the only other item raised by the community — a request for a left-
turn from their neighborhood onto Billy Swails Boulevar — had been
addressed in discussions about potential cut -through traffic and safety
considerations, which modified the original request.
5. Discussion and potential vote on Charleston County Highway 41
Corridor Improvement Project
Mayor Haynie prefaced the discussion by clarifying that Committee votes on
recommendations are legally appropriate and do not require advance public
listing of every possible motion, citing prior Committee precedent and the
opinion of legal counsel David Pagliarini. He then acknowledged the County
representatives in attendance.
Transportation Committee
June 1, 2026
Page 4 of 11
Devri DeToma, Deputy Director, Charleston County Public Works, presented
an update on the Highway 41 Corridor Improvement Project. She reiterated
the project's purpose and need: to reduce congestion, improve safety,
provide a more resilient transportation network, and enhance bicycle and
pedestrian connectivity.
She outlined the updated project schedule:
• Final construction plans are to be submitted to SCDOT within
approximately two weeks.
• Permitting is underway, including a 90-day window for land disturbance
and CZC permits; DES has scheduled another public hearing for July.
• Right-of-way acquisition on track for agent completion by June, with
condemnations by July.
• A Town Encroachment Permit to be submitted in mid-June.
• A maintenance agreement is to be submitted to the Town for approval.
• Final SCDOT approval expected by August; all environmental permits
are expected by September.
• Construction advertisement planned for September, following an
extension granted by the State Infrastructure Bank from the original
May deadline.
Ms. DeToma reported that the project team has conducted eight community
meetings since the Council retreat, with three more being scheduled. These
meetings have resulted in numerous design accommodations:
• Abbots Glen: The team walked the site with residents to demonstrate
that Laurel Hill Parkway would be positioned further from their
townhomes than Bessemer Road and confirmed that no trails would
be impacted.
• Porcher's Preserve: A crosswalk was incorporated , and a drainage
ditch adjacent to the sidewalk will be eliminated with piping.
• Rivertowne: Design revisions are underway to preserve the
community's monument and signage within the right-of-way.
• Dunes West / Riverview Townhomes: A Dominion Energy easement
arrangement was renegotiated to preserve 15 additional feet of buffer
by keeping the shared -use path within the existing utility easement,
with the county assuming responsibility for future repairs.
Transportation Committee
June 1, 2026
Page 5 of 11
• Brickyard Plantation: SCDOT and Dominion Energy agreed to retain
power lines within the SCDOT right -of-way, preserving the
neighborhood buffer. The planned extension of Emma Lane to
Highway 41 was also eliminated after traffic analysis confirmed it was
not needed, resolving concerns from both Brickyard and The Enclave
about cut-through traffic.
• Gregorie Ferry Townhomes: Modeling confirmed that only one travel
lane is necessary at that segment, allowing parallel parking to be
retained.
• Winnowing Way at Highway 17 : A U -turn movement is being
incorporated to ensure safe egress for businesses that cannot turn in
both directions.
Ms. DeToma addressed questions regarding Bessemer Road, which had
previously been considered as an alternative alignment. Mayor Haynie
provided historical context, noting that Council had voted in 2019 to reject
Alternative 7B, which would have used Bessem er Road, in response to
strong opposition from residents who lived there at the time. Ms. Detoma
confirmed that widening Bessemer Road would require significant right -of-
way acquisition from adjacent properties, potentially displacing upward of 20
households, impacting a daycare center, and generating extensive drainage
and construction impacts over at least two years.
Regarding Laurel Hill Parkway's impact on Laurel Hill County Park, Ms.
Detoma stated that the road would affect approximately 10 acres out of a
750-acre park, with no trails impacted. She confirmed that the right -of-way
deed will include controlled access restrictions prohibiting future curb cuts or
access points along the parkway unless changed by council action. Tree
protection measures, including protective fencing and limits of disturbance,
will be enforced, and a robust landscaping plan — including canopy trees,
evergreens, understory trees, and shrubs — has been submitted to the Town
and is being revised per Town comments.
Stuart Day, Traffic Engineer for Stantec, presented microsimulation
modeling for 2045 conditions across three scenarios: No-Build, 4-3-4 without
Laurel Hill Parkway, and 4-3-4 with Laurel Hill Parkway.
• No-Build (2045): Both the northern and southern sections of Highway
41 were shown in near -gridlock conditions during the AM peak hour.
Transportation Committee
June 1, 2026
Page 6 of 11
Traffic attempting to avoid congestion diverted through the Phillips
community, with backups extending nearly to the Bessemer Road
roundabout.
• 4-3-4 Without Laurel Hill Parkway: Conditions improved along most
of the corridor, but a significant bottleneck formed at the point where
four lanes taper to three near the Phillips Community. Dunes West
traffic routed onto Highway 41 to avoid the congested Bessemer
Road/Joe Rouse area, indicating that the intersection problem
remained unresolved.
• 4-3-4 With Laurel Hill Parkway: Traffic is distributed more effectively
across the network. While some minor congestion remained at the new
signalized Laurel Hill Parkway intersection, vehicles throughout the
network moved substantially more freely. Mr. Day confirmed that the
modeling incorporated the two additional traffic signals and
coordinated signal timing.
Mr. Chapman noted the modeling also incorporated projected growth from
approximately 12,000 new homes planned across the Wando River, which
Mr. Day confirmed were factored into all three scenarios per planning data
from each respective municipality.
Ms. Whitaker stated that the no -build scenario was unacceptable. She
emphasized that the majority of residents reaching out to her want
meaningful action taken on Highway 41 traffic, and that the window for major
design changes has effectively closed — the choice before the Committee
is to move forward or do nothing. She highlighted two additional benefits of
the project that often receive insufficient attention: the significant
improvements planned for the Highway 17 and Highway 41 intersection, and
the substantial bike and pedestrian connectivity that would result, including
a new access point into Laurel Hill Park from the east.
Mr. Tinkey reflected on his evolution on the issue, noting that while he had
opposed routing through the park for three years, thorough analysis of every
alternative — including Bessemer widening, a bridge alignment, and various
intersection reconfigurations — had revealed that each option carried greater
costs, greater environmental impacts, or greater displacement of residents.
He credited Chairman Boykin and County staff for the collaborative
engagement and the volume of work done over recent months. He raised
two questions regarding the future integrity of the park: (1) how the County
Transportation Committee
June 1, 2026
Page 7 of 11
could formally commit to not developing the remainder of the park, and (2)
what the effect would be if the Town declined to issue the encroachment
permit.
On the question of the encroachment permit, Ms. DeToma clarified that it is
typically a staff -level administrative process confirming design standard
compliance — distinct from a formal municipal consent — and that it is
required because Laurel Hill Parkway ties into a Town of Mount Pleasant
roadway. Mr. Aton confirmed that the encroachment permit is standard
procedure for any project entering a Town right-of-way and primarily serves
administrative and inspection-tracking functions.
Chairman Boykin, Charleston County Council Member, speaking to the
question of park protection, noted that the County does not own Laurel Hill
Park under the current 99 -year lease arrangement and therefore cannot
rezone or commit the underlying property on behalf of the landowner.
However, he expressed that he would not support upzoning of the parcel and
noted that a future transportation sales tax — estimated at approximately
$690 million with roughly half allocated to urban projects — could potentially
provide funding for a conservation easement if the landowners were ever
willing to pursue permanent protection. He characterized such an outcome
as a "crown jewel" for the area.
Mayor Haynie offered a candid personal reflection, acknowledging that he
had been an outspoken opponent of the road through Laurel Hill Park from
the outset, had spoken against the project at the 2024 DES public hearing at
Wando High School, and had delivered the Council's opposing resolution to
the County. However, he stated that after reviewing the 2045 no -build
projections, he could not, in good conscience, oppose all progress simply
because his preferred outcome was not achieved. He drew a parallel to t he
Town's Rifle Range Road sports complex project, which he had also
opposed and lost, saying, "Sometimes you lose, and things move on." He
reaffirmed the Town's commitment to continuing to advocate for detailed
design improvements throughout the corridor.
On maintenance, Mr. Chapman asked about the cost of maintaining the
Highway 17 landscaping as a point of comparison. Mr. DeMoura estimated
the annual maintenance cost at several hundred thousand dollars, noting
that Mount Pleasant has consistently chosen t o invest in beautification. Mr.
Transportation Committee
June 1, 2026
Page 8 of 11
Chapman suggested that the maintenance cost of Laurel Hill Parkway's
landscaping should be viewed in the same light — a worthwhile expenditure
to maintain quality standards, as the Town does on Highway 17. Chairman
Boykin acknowledged the significant diffe rence between the County's
maintenance standards and those of Mount Pleasant, expressing support for
the Town taking ownership of the road and maintaining it to its higher
standard.
Mayor Haynie confirmed that under the proposed arrangement, the Town of
Mount Pleasant would own and maintain Laurel Hill Parkway, including
pavement, landscaping, traffic enforcement, and emergency response. The
construction and initial landscaping would be funded through the Highway
41 project budget, with ongoing maintenance falling to the Town. Ms.
DeToma noted that a warranty period would be included before the road is
formally transferred.
6. Update – Ongoing Projects
6a. Traffic Management Update
Mr. Aton provided a broad update on ongoing Transportation projects and
programs:
• A 2026 SS4A grant application was submitted to USDOT to develop a
Living Safety Action Plan; a decision is expected by December.
• Construction has commenced on the Harry Hallman Pedestrian
Improvement Project and the Mathis Ferry/Von Kolnitz Shared -Use
Path Project.
• Long Point Road slip lane construction is scheduled to begin this
month.
• The National Drive right-turn lane is going out to bid this month.
• Summer signal timing adjustments were implemented with the start of
the school break, including Friday –Sunday beach traffic coordination
for Isle of Palms Connector and Ben Sawyer Boulevard.
• A Local Public Agency (LPA) agreement with SCDOT has been
executed for the Climate Reduction Policy Grant (approximately $2.2
million), which will fund upgrades to traffic signal detection
infrastructure and flashing yellow arrow intersections.
Transportation Committee
June 1, 2026
Page 9 of 11
• A time -of-day signal phasing switchover at US 17 and
Hamlin/Brickyard is being implemented this month.
Billy Swails Boulevard Phase 4B — A notice to proceed was signed on
May 11. Silt fencing is in place, Mount Pleasant Waterworks has begun utility
relocations on Rifle Range Road, and a yellow spotted turtle observation
period of four to six weeks is underway. A tree walk will follow to evaluate
the potential preservation of additional peripheral trees.
Safe Streets and Roads for All (SS4A) Projects — The 2023 grant (just
under $16 million) is at approximately 30% design across all projects, which
are progressing through the NEPA process. A Transportation Fair was held
at Town Hall on April 30, and an online survey remains open. Work is also
ongoing on 2026 Safety Action Plan updates.
Park West Boulevard and Stockdale Street Roundabout — At 65%
design, with right -of-way acquisition beginning. No permitting concerns at
this time. The project scope was expanded to incorporate trail sections
funded through the Charleston County Greenbelt application for Park
Avenue and Carolina Park portio ns of Mount Pleasant Way. The project is
expected to go out to bid in early 2027.
516 Coleman Boulevard — The project will be rebid this month per prior
Council direction, with results to be reported back to the Town Council.
Mount Pleasant Way — A 2026 BIL grant (approximately $10 million) for
design of the remaining spine route sections is under review, with a decision
expected by the end of summer. The Kenny Mile Trail and a connecting
section from All American Boulevard to the northern termi nus are under
construction. The Scanlonville Praise House Trail and the Mathis Ferry Trail
are also under construction. The Scanlonville Praise Parklet construction is
substantially complete; staff is coordinating with the East Cooper Civic Club
on interpretive signage and a formal groundbreaking.
Mr. Chapman asked about the survey tape recently placed on trees along
the Mathis Ferry Trail corridor between Eagle Street and US 17. Mr. Aton
clarified that the marking is purely for survey and inventory purposes — to
document existing conditions so the design can minimize impacts — and has
no bearing on the proposed removal or retention of any tree. He confirmed
Transportation Committee
June 1, 2026
Page 10 of 11
that Mr. Chapman could participate in a tree walk for this segment, as was
done for the prior section, and that adjacent property owners will be notified
as the design progresses.
Mr. Tinkey raised the Rifle Range Road corridor as another area deserving
careful attention, given its sensitive tree canopy and varying width
conditions. Mr. Aton confirmed that the same outreach and walkthrough
process would be applied.
Bike and Pedestrian Accommodation Projects — The 2023 sidewalk
construction package is wrapping up with Dragoon Drive, Lazy Lane, and
Center Street Extension. Coordination with the Brickyard HOA on a right-of-
way agreement is ongoing. The Wakendaw Boulevard RFB and crosswalk
improvement project wa s recently awarded. The 2025 sidewalk design
package continues, covering Oak Haven Boulevard, Erkman Drive,
Shem/Vincent Drive, and Rifle Range Road (south of Target on the Isle of
Palms side).
Whilden Street/Royall Avenue Corridor Safety Improvements — Final
DOT permitting is nearly complete, pending minor landscaping comments in
the MS4 and design review process. The project remains unfunded for
construction at approximately $1.2 million, with staff working to leverage
county and DOT resurfacing efforts to reduce costs.
Snee Farm Sound Wall — Mayor Haynie relayed constituent concerns that
the sound wall along Snee Farm is not performing as expected, with
residents reporting noise levels worse than anticipated. Mr. Aton and Council
Member Tinkey noted that Town staff have repeatedly contacted SCDOT
regarding multiple broken sections caused by vehicle accidents and fallen
trees, with repairs proceeding slowly. Mr. DeMoura confirmed he had spoken
that morning with Secretary Powell, who committed to directing his
engineering team to investigate the delays and explore the possibility of a
private contract to expedite repairs. On the question of wall height, Mr.
Morrison noted that wall heights are governed by the noise analysis
conducted as part of the original NEPA process (circa 2008–2009), and that
any reassessment would require a new analysis. Staff agreed to follow up
on the current noise conditions and report back to the committee.
Transportation Committee
June 1, 2026
Page 11 of 11
Mini Traffic Roundabouts in Old Mount Pleasant — Mr. Aton confirmed
that SCDOT District 6 has approved the removal of the mini traffic
roundabouts. Removal is scheduled for mid-June, after which the previous
stop-control configuration for side streets will be restored.
7. Adjourn
There being no further business, the meeting was adjourned at 3:04 p.m.