Bids and Purchases Committee
Monday, June 1, 2026
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
Mi
nutes
Cl
ick here to listen to recording
Powerpoint Presentation
1. Ca
ll To Order
The Bids and Purchases Committee meeting was called to order on
Monday, June 1, 2026, at 8:30 a.m. in Mount Pleasant, SC. Council
Member Daniel Brownstein opened the meeting with a brief moment of
silence. Council Members Alex Crosby and Mike Tinkey were present.
2. Approval Of Minutes From The May 4, 2026 Meeting
Motion to approve the minutes from the May 4, 2026 meeting was made
by Council Member Alex Crosby and seconded by Council Member
Tinkey. The motion carried.
3. Public Comments – None.
The Chair invited members of the public to address the committee. No
members of the public came forward, and the committee proceeded to
the next item.
4. Award Of A Contract For The Construction Engineering And
Inspection Services For The Billy Swails – Section 4B Project
Chief Financial Officer Tammy Harness presented the item on behalf of
staff. She explained that the Bids and Purchases Committee had
previously approved agreements with consultants for various on-call
transportation, engineering, and development services. Construction
Engineering and Inspection (CE&I) services are now required for the
construction of Billy Swails Boulevard, Section 4B. The selected
consultant, Rummel, Klepper & Kahl, LLP (RK&K), will provide on-site
inspection, quality assurance, independent assurance services, EEO
Bids & Purchases
June 1, 2026
Page 2
compliance assistance inclusive of Davis Bacon reviews, and inspection
and testing services. The purpose of these services is to ensure quality
materials and workmanship, compliance with federal EEO requirements,
and adherence to applicable state environmental laws. The completion
date for these services is November 7, 2027. Staff recommended
contracting with RK&K in the amount of $357,898.55, pending SCDOT
concurrence.
Council Member Mike Tinkey expressed appreciation for the project,
acknowledging it as long-awaited and situated in a sensitive
environmental area. He asked staff to elaborate on the environmental
stewardship measures being taken. James Aton, Deputy Director, from
Engineering Development Services explained that RK&K would
supplement Town staff in both environmental compliance and
construction quality assurance. He noted that monitoring and potential
relocation of the yellow-spotted turtle is currently underway, and that the
inspector would assist with tree protection zones and other
environmental safeguards in addition to standard roadway construction
oversight.
Council Member Tinkey also inquired about efforts to preserve historic
trees along the roadway corridor. Deputy Director Aton confirmed that
once silt fencing is installed and turtle observations are complete, a field
walk with staff and elected officials will be scheduled to assess which
trees currently slated for removal could be saved. Council Member
Tinkey further confirmed that stormwater and water quality were
significant components of the project, which Deputy Director Aton
affirmed, noting that stormwater management associated with the new
roadway alignment would also be reviewed by RK&K.
Motion to approve the award of a contract to Rummel, Klepper & Kahl
(RK&K) in the amount of $357,898.55 for Construction Engineering and
Inspection services for the Billy Swails – Section 4B Project, pending
SCDOT concurrence, was made by Council Member Tinkey and
seconded by Council Member Crosby. The motion carried 3-0.
5. Award Of A Contract For Wakendaw Boulevard Sidewalk
Improvements And Installation Of Rectangular Rapid-Flashing
Beacons (RRFB)
Chief Financial Officer Tammy Harness presented this item. She noted
that the Bids and Purchases Committee had previously approved an on-
call agreement with IPW Construction Group, LLC for curb, sidewalk,
Bids & Purchases
June 1, 2026
Page 3
concrete slab, and structure replacement work. Staff determined that
areas along Wakendaw Boulevard and Mathis Ferry Road require
services from this contractor. The project involves safety improvements
to an existing crossing near the intersection of Wakendaw Boulevard
and Mathis Ferry Road, encompassing the installation of 60 linear feet of
sidewalk, crosswalk markings, rectangular rapid-flashing beacon (RRFB)
devices, drainage improvements, removal of an existing crosswalk, and
installation of surface-applied detectable warning material to ensure
ADA compliance. The construction period is 270 days. Staff
recommended contracting with IPW Construction Group, LLC in the
amount of $109,459.40, based on unit pricing established in the existing
on-call agreement.
Council Member Tinkey expressed enthusiasm for the project and asked
whether the work would be coordinated with the Town's tree protection
and planting programs, given that a new contractor is involved. Staff
Engineer Sophie Holmes confirmed that no trees are anticipated to be
impacted or removed as part of this project, and that no construction
activity is expected within any tree protection zones.
Council Member Alex Crosby expressed strong support, noting that
family and friends in the area have long raised concerns about
pedestrian safety at that crossing. Council Member Brownstein echoed
the committee's enthusiasm, referencing a concurrent pedestrian
improvement project at Seaside Farms along Rifle Range Road as
evidence of the Town's broader commitment to pedestrian safety.
Motion to approve the award of a contract to IPW Construction Group,
LLC in the amount of $109,459.40 for Wakendaw Boulevard Sidewalk
Improvements and Installation of Rectangular Rapid-Flashing Beacons,
was made by Council Member Tinkey and seconded by Council Member
Crosby. The motion carried 3-0.
6. Award Of A Contract For The Design Of The Mill Tract Basin
Stormwater Improvement Project
Chief Financial Officer Tammy Harness presented the item, explaining
that the Bids and Purchases Committee had previously approved
agreements with consultants for various on-call transportation,
engineering, and development services and that staff identified Weston
& Sampson Engineers, Inc., for this project. The project is funded in part
by a grant from the U.S. Army Corps of Engineers (USACE) Water
Resources Development Act program. Under the partnership structure,
Bids & Purchases
June 1, 2026
Page 4
the Town will contract for the design phase while the USACE will
manage and contract for construction. The project aims to improve the
stormwater conveyance system in the Mill Tract Basin to a 10-year level
of service to the maximum extent practicable. The scope of design
includes upgrades to existing gray infrastructure, improvements to
roadway drainage through reestablishment of roadside cross-sections,
potential piping, or low-impact development (LID) components, siting
and prioritization of LID infiltration practices upstream of the Ben Sawyer
Crossing, and community engagement. The design and permitting
phase is 471 days. Staff recommended contracting with Weston &
Sampson Engineers, Inc. in the amount of $300,000, pending U.S. Army
Corps of Engineers approval.
Kevin Mitchell, Deputy EDS Director, spoke to the depth of the
consultant selection process, noting that Weston & Sampson was
chosen through an RFQ process from the on-call list as the firm best
suited to deliver an environmentally sensitive project. He described the
Mill Tract Basin as approximately 120 acres in size, ranked seventh on
the Town's 2017 stormwater priority list, and situated with a major outfall
into Shem Creek via a crossing at Ben Sawyer Boulevard.
Council Member Tinkey inquired about the specific low-impact
development strategies planned. Mr. Mitchell described the intent to use
groundwater recharge techniques through open channels and swales,
improve roadside swales to allow better stormwater infiltration, explore
strategic plantings, protect all existing trees with no removals planned,
and investigate a water treatment separation device at the end of
Freelock Drive, where erosion has been a recurring issue.
Council Member Tinkey also emphasized the importance of community
outreach ahead of construction disruptions, which Mr. Mitchell confirmed
was a priority, noting that a thorough outreach effort is planned to
engage residents and foster a sense of ownership in the project.
Regarding the project timeline, Mr. Mitchell indicated that a kickoff
meeting with the USACE is scheduled for the following day. The design
phase is anticipated to take six to eight months, with construction
improvements likely visible by late 2027 or early 2028.
Council Member Tinkey asked how this project relates to the ongoing
Kincaid area construction. Mr. Mitchell explained that the Kincaid project,
which is nearing completion with pipe installation wrapping up that week
and final pavement expected within two to three weeks, will effectively
remove approximately 18 acres of drainage from the Mill Tract Basin,
Bids & Purchases
June 1, 2026
Page 5
thereby improving the basin's overall capacity even before the Mill Tract
project begins.
On the topic of water quality, Mr. Mitchell confirmed that pre-project
baseline water quality testing will be conducted, with post-project testing
to follow upon completion, and ongoing monitoring thereafter given the
basin's connection to Shem Creek. Council Member Tinkey encouraged
staff to engage with the Waterkeeper organization, suggesting the
installation of QR codes and signage at outfalls to allow the public to
track real-time water quality data and demonstrate the Town's
commitment to environmental stewardship. Mr. Mitchell expressed
support for the idea. The Chair added a personal observation about the
interconnected nature of the Town's land and waterways, encouraging
residents to be mindful of how their land activities ultimately affect the
health of Shem Creek.
Motion to approve the award of a contract to Weston & Sampson
Engineers, Inc. in the amount of $300,000 for the Design of the Mill Tract
Basin Stormwater Improvement Project, pending U.S. Army Corps of
Engineers approval, was made by Council Member Tinkey and
seconded by Council Member Crosby. The motion carried 3-0.
7. Adjourn
The meeting was adjourned at 8:46 a.m.