RecordWell Data

_05212026-2191

Town of Mount Pleasant · Charleston County · meeting of May 21, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

TREE TASK FORCE Thursday, May 21, 2026 8:00 a.m. Municipal Complex, Committee Meeting Room 100 Ann Edwards Lane, Mount Pleasant, SC 29464 MI NUTES Cl ick here to listen to the recording. Discussion Topics 1. Call To Order Chair McKee called the Tree Task Force meeting to order at 8:01 AM on Thursday, May 21, 2026. Shanna Harris, David Quick, Michelle Mansour, George Grice, and Deidre Kennedy were all present. Edward Oswald was absent. 2. Approval of Agenda Motion to approve the agenda was made by Mr. Quick and by Ms. Mansour. The motion carried, all in favor. 3. Approval of minutes from April 30 Meeting Motion to approve the minutes from the April 30 meeting was made by Mr. Quick and seconded by Ms. Mansour. The motion carried, all in favor. 4. Public Comment [None] 5. Work Plan TTF 2026 Work Plan 5a. Continued Review and Discussion of Tree Protection Zoning Ordinances and Policies Chair McKee opened the work plan discussion, noting that the meeting was a continuation of the previous session and that Christiane Farrell, Assistant Town Administrator, had prepared summary slides based on prior discussion. Before Ms. Farrell began her presentation, Mr. Bob O'Neill offered a time management suggestion, recommending that the Tree Task Force May 21, 2026 Page 2 of 19 group spend the first hour focused on the ordinance discussion and then dedicate the remaining time to reviewing the recommendation section of the draft final report. He emphasized that the ordinance conversation had the potential to extend indefinitely, and that disciplined time management would help the group identify the outstanding issues requiring resolution before the next meeting. The group agreed to this approach and Farrell proceeded. Updated with notes from April meeting • Tree Protection Zone- allow flexibility/ reduction of 20 to 25%. Protection plan from arborist for construction period. General Agreement on 20% reduction w/ plan • Reduce minimum caliper for mitigation trees to 1.5 inches. General Agreement • Tree mitigation for single family nonconstruction- revise to 1 to 1 tree placement rather than inches when required. More Discussion/ Options • Develop minimum tree density standard for plantings on single family lots involving construction More Discussion/ Options • Reduce classification of laurel oaks (water oaks remain as is) Limited discussion, more needed to determine consensus • Allow photo evidence of dead trees (esp. laurel and water oaks) and photo as proof of planting (policy not ordinance) Limited discussion, more needed to determine consensus • Clarify ordinance language and fines for pruning, construction violations in the TPZ Limited discussion, likely supported, legal input needed • Streamline ordinance language for capital projects Limited discussion Summary: Staff Recommendations Laurel and Water Oaks Staff recommendation • Reclassify Laurel Oaks to Class III, leave Water Oaks as Class III • This potentially eliminates the issue of people trying to argue laurel oaks down to water oaks classification (ordinance revision) • Laurel and Water Oaks have shorter life spans resulting in very frequent applications for removal, most are dead or poor • Allow photo evidence for these species (and others) to save staff resources (nonconstruction permits only)- (policy decision) Tree Task Force May 21, 2026 Page 3 of 19 • Staff recommends strengthening the language for pruning and construction related violations. These violations typically do not involve tree removal but can be very harmful to the health and future growth of the tree. • No specific language is needed from TTF. Staff will coordinate with Legal in drafting ordinance amendments to develop better enforcement language and fees. Enforcement Capital Projects • The ordinance needs modification and clarification to create uniformity, flexibility, and implementation standards unique to public projects and utility installations in public right-of-ways. • No changes are proposed to the 160” per acre or tree mitigation with new capital projects. • No specific language is needed from TTF. This primarily involves reorganization of the text and includes other matters dealt with by staff to include fiber installation and maintenance matters. Tree Task Force May 21, 2026 Page 4 of 19 • Ordinance amendments where there is general agreement should have a significant positive impact on processes and staff resources • allowing 20% reduction in the TPZ, • reducing replacement trees to 1.5 inches, • shifting Laurel Oaks to Class III • Policy changes allowing photo evidence along with above ordinance changes would help support staff resources • It has been determined that ordinances and processes for commercial development are working well. Are further changes needed to single family beyond the above proposed amendments ? • 1 to 1 replacement • Tree density (160”/ acre or 20 trees/ acre) • Replacement of Class IV, dead, dying and hazardous tree (would this apply to commercial?) • Increase protection levels on trees less than 24 inches (require variance approval for 16 inch up) Options/ Considerations 1) Keep the ordinance as is, no changes a) Mitigation based on inches for Class 1, 2, and 3 in good or fair condition b) No replacement for Class 4, dead, or hazardous 2) Establish tree density of 160"/ acre or 20 trees/ acre 3) 1 to 1 tree replacement Single Family: Construction & Nonconstruction Tree Task Force May 21, 2026 Page 5 of 19 Tree Protection Zone and Mitigation Tree Size Ms. Farrell began by recapping the key points from the prior meeting where general consensus had been reached. She stated that the group had largely agreed on allowing a 20 percent reduction in the tree protection zone, provided that a specific arborist management plan accompanied any such request. She also noted consensus around reducing the minimum size of mitigation trees from 2.5 inches to 1.5 inches for single-family residential applications. Farrell indicated she would return to the single-family topic at the end of the presentation, as that remained the most complex and unresolved area. Laurel Oaks and Water Oaks Reclassification Ms. Farrell transitioned to the question of Laurel Oaks and Water Oaks, noting that data presented in previous meetings had identified these species as the source of a disproportionate number of applications coming through the planning department, particularly on the non- construction residential side. She stated that staff had discussed moving Water Oaks down from Class II to Class III in a prior meeting, and that the current proposal was to move Laurel Oaks down to match Water Oaks at Class III, rather than dropping Water Oaks further to Class IV. Ms. Farrell explained that Senior Planner Chris Lubert had noted a recurring pattern of applicants arguing that a Laurel Oak was a Water Oak in order to obtain lower mitigation requirements. By equalizing their classification, the administrative burden of those disputes could be • Additional ordinance amendments or process modifications? Tree Task Force May 21, 2026 Page 6 of 19 reduced. She noted that this change reflected both the shorter lifespan observed in these species and input from staff arborist Eddie Bernard, who had endorsed the reclassification. Ms. Kennedy asked whether removing these trees would still require an arborist report. Farrell responded that staff did not always require arborist reports for removals, and that Mr. Lubert could speak further. Mr. Lubert clarified that when a tree appeared to be in obvious poor condition, no arborist report was typically needed, but when the tree appeared healthy with no obvious defects, staff would generally request an arborist report prior to approving removal. He also noted that the Engineering and Development Services likewise routinely requested arborist reports. Ms. Harris raised the observation that protecting Laurel Oaks at the same level as Live Oaks seemed inconsistent given the significantly shorter lifespan of Laurel Oaks. She noted that Water Oaks were generally permittable in construction situations due to their tendency to fail, and that Laurel Oaks exhibited similar characteristics. She asked whether reclassifying them to Class III would make Laurel Oaks more permittable in construction scenarios as well. Mr. Lubert confirmed that at Class III, a Laurel Oak removal would not require a Board of Zoning Appeals hearing. He noted that he routinely counseled applicants against placing structures close to large Laurel Oaks, citing a recent incident in which a large Laurel Oak dropped half its canopy onto adjacent private property, damaging a vehicle. He stated that this type of failure was common with both Laurel and Water Oaks. Ms. Kennedy followed up, asking whether a tree in fair or good condition would still require a Board of Zoning Appeals review if it was a Laurel Oak at Class III. Lubert confirmed it would not. Mr. Quick asked staff whether Laurel Oaks and Water Oaks were effectively equivalent in quality. Mr. Lubert responded that there were small differences at the detailed level, but that when evaluating trees from a failure risk perspective — which was how he primarily evaluated them — both species exhibited high failure rates, particularly in storm conditions. He noted that recent storms had produced primarily Laurel Oak and Water Oak failures, not pine failures, which he attributed in part to the lack of regular maintenance and arborist inspection by property owners. Ms. Harris remarked that in her professional experience managing public tree issues, large Water Oaks and Laurel Oaks in the right-of-way could Tree Task Force May 21, 2026 Page 7 of 19 cause significant operational disruptions when they fell in storms, particularly when entangled in power lines. She described the difficulty of clearing such large trees and expressed her professional discomfort when trees of these species grew to large diameters. Chair McKee asked whether there was any disagreement within the group regarding reclassification. Mr. Grice noted that when it came to hardwood timber value, the two species were effectively equivalent. Ms. Harris confirmed her view that quality was approximately the same, noting she saw more Water Oak failures but a substantial volume of Laurel Oak failures as well, with comparable lifespans. Ms. Mansour noted that the footnote in the mitigation table already acknowledged quality concerns for both Laurel Oaks and Water Oaks. Chair McKee observed that both species already carried footnotes in the table reflecting prior adjustments, and that moving Laurel Oaks to Class III would simply align their treatment with the existing footnoted understanding. Ms. Farrell confirmed this, attributing the original footnoting to a recommendation from Eddie Bernard based on his field experience, noting that both Mr. Lubert and Mr. Bernard had agreed the move to Class III was appropriate. Chair McKee asked for a straw poll, and the group indicated general agreement to reclassify Laurel Oaks to Class III. Ms. Kennedy then posed a question to Ms. Harris, asking whether she would want to protect a 16-inch Laurel Oak. Ms. Harris responded emphatically that she would, stating she strongly preferred protecting trees in the 16-to-24-inch range as well as smaller trees, noting that this size range was more viable and healthier. She stated her concern that a 24-inch-and-up threshold was where trees of these species began presenting dangerous structural risk, citing tendencies toward heartwood rot and included bark leading to failure. She expressed a preference for providing flexibility on the larger specimens while offering stronger protection to the smaller ones. Ms. Mansour referenced the footnote again, noting it addressed quality ratings. Chair McKee summarized the discussion by noting that both species had already been recognized as lower quality through the footnote system and that moving them to the same category was a natural extension of that prior reasoning. The group expressed consensus in favor of the reclassification. Photo Evidence Policy for Non-Construction Residential Tree Task Force May 21, 2026 Page 8 of 19 Chair McKee then moved to the question of allowing photo evidence as a tool for staff evaluation of tree removal applications, particularly in the residential non-construction context. He noted that approximately 80 percent of trees coming through the residential non-construction process were dead or dying Water Oaks or Laurel Oaks, and questioned the value of spending significant staff time on applications where the condition of the tree was obvious. Ms. Mansour asked whether photo evidence would be submitted alongside an arborist report. Ms. Kennedy raised a concern that applicants sometimes claimed trees were in poor condition as a pretext, then proceeded to construct a pool or other improvement after the tree was removed. Ms. Harris noted that a submission from an established tree service would carry far more credibility than a homeowner's photos, and that professionals would not risk their reputation over a single application. She distinguished between professional submissions and those from homeowners acting on their own behalf. Mr. Lubert explained how he had used photo evidence in past cases, noting that he looked for contextual photos that showed the surrounding property, confirmed the tree's location relative to GIS data, and that season and species mattered — noting, for example, that a pecan with no leaves in winter would not be mistakenly approved as dead. He described looking for contextual framing rather than close-up shots. Chair McKee clarified that this policy was not being proposed for commercial properties or for construction applications, where staff were already conducting site visits as part of the storm water and development review process. He emphasized the context of residential non-construction only — a homeowner seeking to remove a single tree with no associated construction. He noted that approximately 700 applications had come through the previous year, representing about 390 trees total and generating only approximately $20,000 in total revenue, making the administrative stakes of any decision relatively low. Chair McKee suggested that the town's arborist staff had good professional judgment and that the group's endorsement of the photo evidence approach would provide a backstop for staff if challenged politically by a council member or neighbor. He suggested the policy would allow staff to exercise their professional discretion in obvious cases without requiring burdensome formal visits. Ms. Kennedy expressed concern about a pattern she had observed in which healthy trees were removed under various pretexts, only for the Tree Task Force May 21, 2026 Page 9 of 19 property to be subsequently redeveloped. Others acknowledged this pattern but cautioned that attempting to address it through a moratorium or time-based restriction would raise significant legal questions about private property rights. Mr. Quick urged the group to stay on schedule, noting the time constraint. Chair McKee called for a straw poll on whether the group supported allowing flexibility through photo evidence with deference to town staff judgment. The group indicated unanimous general agreement. Ms. Farrell noted that when staff received photo evidence and still had questions, they retained the discretion to request an arborist report or conduct a site visit. The policy was understood to be an option, not a mandate. Violations Language and Enforcement Ms. Farrell indicated that the next item — refinement of language for tree protection zone violations during construction, including incidents involving root systems — did not require specific language from the task force at this time. She stated that staff and legal counsel were capable of improving that language, and that the recent incident near the Town Center had made the need for clearer enforcement language apparent. She asked for general concurrence that staff would work with legal to improve that language. The group indicated agreement, and Chair McKee confirmed this point would be included in the recommendations. Capital Projects Ms. Farrell presented the capital projects ordinance section, noting that the relevant language had been amended multiple times over the years at the request of various utility entities, resulting in non-uniform provisions. She stated that staff were not proposing any changes to the substantive requirements — including the 160 inches-per-acre standard or the 8-inch tree survey requirement for new capital projects — but was recommending a cleanup of the language for clarity and consistency. She stated that most anticipated town projects would likely result in a net increase in trees rather than a decrease, citing the Jones Center redevelopment as an example. She noted that fiber installation by private companies had become a particular problem area, and that this issue would likely be incorporated into the enforcement language cleanup as well. Tree Task Force May 21, 2026 Page 10 of 19 Ms. Kennedy expressed support for the proposed cleanup. Farrell confirmed that Mr. Morrison had already begun work on some of the relevant language. Chair McKee summarized the recommendation as supporting language cleanup to address capital projects and enforcement, without changes to the substantive content of the ordinance requirements. The group agreed with that framing. Single-Family Residential — Construction and Non-Construction Ms. Farrell stated that all ordinance topics had now been addressed except for single-family residential, which she described as the most challenging area both for the task force and for staff. She noted that commercial development was working well under the current system, with the Design Review Board providing oversight and professional applicants already engaged. She introduced a large physical matrix board she had prepared to help the group visualize the options and their combinations across construction and non-construction scenarios. She explained the three main options: keeping the ordinance as-is with only the previously agreed changes, establishing a tree density standard, implementing a 1- to-1 replacement requirement, or pursuing a combination. She acknowledged the difficulty of resolving how these options might interact — for example, whether meeting a density standard should exempt an applicant from the 1-to-1 replacement requirement. Ms. Farrell then summarized the key unresolved questions: the 1-to-1 replacement concept versus tree density, treatment of Class IV trees (dead, dying, hazardous), and whether the protection threshold should be lowered from 24 inches to 16 inches. Chair McKee reflected on the purpose of the task force and the overarching goal of canopy recovery. He expressed concern about adding complexity and onerousness for single-family property owners, noting that the group's prior recommendations had consistently focused on making planting easier rather than harder. He acknowledged that single-family was the most complex context, given the absence of professional design teams that were standard in commercial applications. Ms. Mansour noted her experience on the Planning Commission and clarified that the Planning Commission saw new single-family construction and some additions, but not non-construction applications. Tree Task Force May 21, 2026 Page 11 of 19 She expressed interest in a land development waiver mechanism that could be tied to density requirements. She also stated a preference for 1-to-1 tree replacement in the ground rather than payments into the tree bank, citing situations in which subdivisions cleared multiple trees without replacing them. She noted that the current ordinance already required at least one mitigation tree in the ground for most cases, with only the final amount payable into the bank. She expressed a desire to lower the protection threshold from 24 inches to 16 inches, stating her view that a 16-inch tree represented a meaningful, viable specimen worth protecting. She noted that Summerville and Greenville had both moved to a 16-inch threshold and were reporting workable outcomes. Ms. Harris acknowledged the value of protecting smaller trees but cautioned against undue complexity, noting that in cases where a property already had a high density of trees, flexibility to remove some smaller ones was sometimes ecologically appropriate — allowing surrounding specimens more space to grow. She described situations where compelling property owners to go through Board of Zoning Appeals for every 16-inch tree could generate lawsuits and resentment. Chair McKee referenced a conversation he had had with a staff member from Summerville, noting that even after implementing the 16-inch threshold, Summerville continued to see very low volume going to their tree board, because staff spent time filtering out obvious cases before elevation. Ms. Mansour suggested that combining the 16-inch threshold with a density or acreage requirement might provide a workable framework. The group began discussing Summerville's approach, which she described as prohibiting lots from dropping below a required tree-per- acre ratio of 20 trees per acre. She suggested that meeting the density standard could provide flexibility to remove trees without 1-to-1 replacement, serving as a backstop. Mr. Quick raised the question of whether tree density with the 160- inches-per-acre and 20-trees-per-acre standard would give staff enough flexibility while still protecting canopy. Mr. Lubert stated that some properties would be over the standard and some would be under, and that the density standard functioned as one layer within a larger system. Ms. Farrell asked whether the practical effect would be that applicants could remove trees freely as long as they maintained the density standard. Ms. Kennedy noted that trees requiring Board of Zoning Tree Task Force May 21, 2026 Page 12 of 19 Appeals approval would still require that review. Ms. Mansour suggested that language encouraging protection of 16-inch-and-larger trees could be included even if not strictly enforceable, and that a tree survey could be required to help staff evaluate compliance. Mr. O'Neill offered a caution, noting that the group needed to be careful about applying the density requirement to non-construction applications, as this would effectively create nonconforming lots out of properties whose owners were simply seeking to remove a single tree. Staff concurred strongly, with Ms. Farrell stating explicitly that staff did not recommend applying the density standard to non-construction. Chair McKee suggested that for non-construction, the existing 1-to-1 replacement requirement was already in the ordinance and was working reasonably well, and that the density standard should apply to construction only. He proposed that the group think about this as: single- family construction would require meeting the density standard (160 inches per acre / 20 trees per acre), and single-family non-construction would be simplified to a straight 1-to-1 replacement, removing the Tre Bank-based mitigation calculation. Mr. Lubert noted that a common point of confusion and contention in the current system was that applicants would replace a single tree and then be surprised to learn they still owed mitigation inches. He described this as the main implementation challenge. Chair McKee suggested that simplifying non-construction to a flat 1-to-1 replacement standard without Tree Bank mitigation would eliminate this confusion. Discussion arose about including Class III trees (declining condition, including the newly reclassified Laurel Oaks and Water Oaks) in the 1- to-1 replacement requirement for non-construction. The group noted that Class III trees currently did not require replacement, and that adding them would incrementally increase tree planting. Mr. Quick expressed support for this inclusion as a means of leveraging more planting opportunities. A broader discussion emerged about invasive species and whether Class IV trees (including species such as Chinese Tallow and Bradford Pear) should also require replacement or should be handled separately through a removal incentive program. The group recognized the ecological tension, noting that requiring permits for invasive removal might inadvertently discourage homeowners from removing them. After debate, the group agreed that invasive species should be handled through a dedicated program rather than the permitting process, and Tree Task Force May 21, 2026 Page 13 of 19 that the ordinance should not be burdened with that complexity at this stage. Discussion then turned to whether native trees currently classified in Class IV — specifically pines — deserved reconsideration. Several members noted that pines were ecologically valuable and should perhaps be moved to Class III. Mr. Grice and Ms. Harris both expressed some support, but Mr. Lubert noted that the classification issue was complex and that pines presented their own distinct management considerations. The group agreed that the pine classification question would be added to the next agenda for continued discussion. Public Services Director Andy Weis offered a comment from a long-term infrastructure perspective, noting that a recurring issue was the placement of new trees in utility easements, which led to their eventual removal when infrastructure maintenance was required. He urged the group to consider whether tree placement requirements could reinforce the importance of keeping new trees out of easement areas to ensure long-term canopy survival. The group acknowledged this was an important practical consideration and noted its relevance for staff review of mitigation planting locations. Chair McKee also introduced two additional recommendations for non- construction mitigation: first, raising the mitigation fee from 2 times the wholesale cost per inch to 3 times the wholesale cost, bringing it in line with Summerville's $200-per-inch rate and reflecting the actual cost of planting, which staff had estimated at approximately 3 times wholesale. He argued that the current fee was below planting cost, incentivizing payment over planting. Second, he suggested allowing greater flexibility in where replacement trees could be planted — including pre-designated public spaces and, with appropriate agreement from the relevant entity, HOA common areas or other private common lands — rather than restricting all mitigation planting to the subject property. Mr. Grice asked for clarification on the common area planting proposal, questioning whether a tree planted in a public park and then mowed down would genuinely constitute mitigation. Chair McKee clarified that under Summerville's framework, planting in public areas required staff approval, and that planting on private common lands would require a signed letter of agreement from the HOA or property manager confirming maintenance responsibility. He noted that these were edge cases, and that the vast majority of the 390 annual applications involved dead or dying trees that were simply replaced on-site without issue. Tree Task Force May 21, 2026 Page 14 of 19 Ms. Harris noted that for lower-income property owners, a significant increase in fees might be burdensome, even while acknowledging that the increase was justified from a program funding standpoint. Chair McKee acknowledged the concern. Mr. O'Neill noted that the hour reserved for the ordinance discussion had elapsed and recommended the group move forward, summarizing the outstanding questions for the next meeting. Chair McKee summarized the apparent agreements as follows: single- family construction would be subject to a density standard of 160 inches per acre and 20 trees per acre (Option 2 from the matrix); single-family non-construction would be simplified to a 1-to-1 replacement without Tree Bank-based mitigation, including Class III trees. He asked the group to confirm these two points. The group confirmed consensus on both points. Discussion on 16-Inch Protection Threshold Chair McKee raised the remaining unresolved question of whether the protection threshold for residential trees should be lowered from 24 inches to 16 inches, which would subject 16-to-24-inch trees to a review process rather than allowing their removal without review. Ms. Mansour continued to advocate for this change, arguing that 16 inches represented a tree with significant viability and canopy contribution, and that other municipalities such as Summerville and Greenville had successfully implemented it. Ms. Harris expressed concern about the Board of Zoning Appeals as the review body, noting that decision-making there could feel inconsistent or emotionally driven rather than grounded in clear land use criteria. Ms. Farrell explained the legal context of the Board of Zoning Appeals, noting that under state law, its function in the variance context was to determine whether a hardship existed — not merely whether a property owner wanted to remove a tree. She noted that the Board had not been approving many such applications recently. Chair McKee proposed tabling this question for the next meeting, noting that sufficient discussion had taken place and that the group had made substantial progress on other items. Mr. Grice suggested that rather than scheduling a special meeting, the group could extend the June meeting slightly if needed to resolve this item. Mr. O'Neill agreed, noting that if the revised draft report was Tree Task Force May 21, 2026 Page 15 of 19 circulated in advance of the June meeting, the group should have enough material to close out the remaining issues. Chair McKee noted that the remaining open items included the 16-inch threshold question, the pine classification question, and the single-family construction and non-construction framework as refined in that day's discussion. 6. Review And Discussion Of Draft Final Report And Recommendations Draft Report Recommendations • Establish a long-term canopy goal of 40% within 20 years. • Develop a 20 year Tree Planting Plan that identifies specific planting areas , their priority , and the type and costs of planting that area . This would include all land uses , not just Town owned land . • Develop a Tree Scorecard /Dashboard /Urban Forest Tracking System to continuously assess tree losses and gains for all the tree programs and tree removal permitting processes (residential , commercial , and capital improvements ). • To achieve canopy objectives , establish a dedicated leadership role within the Town’s organizational structure to oversee tree-related programs and outcomes . • To achieve canopy objectives , re-imagine existing programs to increase tree planting volumes , engage the community at every opportunity , and seek external sponsors and funding . • Prioritize the majority of Tree Mitigation Funds to support tree planting and canopy-related programs . Tree Task Force May 21, 2026 Page 16 of 19 Chair McKee transitioned to the draft final report, noting a brief recess during which Chair McKee stepped out at 9:32 AM. Ms. Farrell indicated that recording should continue during any discussion in Chair McKee’s absence. Chair McKee returned at 9:36 AM. Ms. Farrell and Mr. O'Neill recommended focusing exclusively on the recommendations section of the report rather than the full narrative, noting that consensus on the recommendations would allow the narrative text to follow. Chair McKee agreed, and the group proceeded through the recommendations sequentially. First Set of Recommendations The first recommendation — establishing a canopy goal of 40 percent within 20 years — was presented. The group indicated agreement. The second recommendation — establishing a scorecard and dashboard with a tracking system to identify canopy gain or loss across all review processes — was presented. The group indicated agreement, noting it was essential for monitoring progress toward the stated goal. The third recommendation — identifying a dedicated leader to drive achievement of the canopy objective — was presented. The group indicated agreement. The fourth recommendation — reimagining existing tree planting programs — was presented. The group indicated agreement. Draft Report Recommendations • Explore grants , sponsorships , and public private partnership opportunities to leverage Town funding to focus on education and planting programs to encourage private tree planting . • Set aside a portion of the funds for tree-related financial support programs to ensure tree benefits are available to all . • Provide detail encroachment options for the Tree Protection Zones to enable more flexible site use for development without tree removal • Reduce minimum tree size for mitigation replacement from 2.5” to 1.5” for residential non construction tree removal permits for easier planting by residents themselves and better long term survivability of the replacement tree. RESIDENTS MUST PROVIDE PROOF . • Implement 160”/acre or 20 trees /acre as minimum tree cover for Residential Non Construction (??). • Simplify mitigation for tree removal permits for Residential Non Construction to a simple one for one replacement in all cases and conditions with the exception of Good Condition tree in Categories 1 and 2. Tree Task Force May 21, 2026 Page 17 of 19 The fifth recommendation — prioritizing tree mitigation funds to support canopy-related programs — was presented. The group indicated agreement. Second Set of Recommendations Chair McKee moved to the second slide of recommendations. The first recommendation on this slide — exploring branch partnerships, public-private partnerships, and town funding mechanisms to support tree programs — was presented. The group indicated agreement. The second recommendation — setting aside a portion of funds to support programs and ensuring tree benefits are equitably available through a financial hardship fund — was presented. The group indicated enthusiastic agreement. The third recommendation — defining specifics for tree protection zone encroachment violations — was presented. The group agreed this was already addressed in the ordinance discussion. The fourth recommendation — reducing the minimum mitigation tree size from 2.5 inches to 1.5 inches — was presented. Ms. Farrell asked whether this reduction should apply only to non-construction or to all residential applications. Ms. Mansour and others expressed preference for applying it to all residential, noting that in construction scenarios, the survivability benefit of smaller caliper trees at planting was equally applicable. The group agreed to apply the 1.5-inch minimum to all residential applications. Funding Recommendation — Undergrounding Discussion Mr. O'Neill raised a concern about the framing of the funding recommendation, noting that as written, it appeared to set up a competition between undergrounding utility lines and tree planting, given that both drew from the tree mitigation fund. He cautioned that this framing could generate opposition from residents who strongly supported undergrounding as a form of tree protection. Chair McKee acknowledged the concern, noting that the group's intent had never been to oppose undergrounding, but rather to ensure sufficient funding for tree planting programs. He proposed revising the recommendation to emphasize the need for increased funding for tree programs without explicitly framing it in opposition to undergrounding. Tree Task Force May 21, 2026 Page 18 of 19 Mr. Quick stated his position that undergrounding was properly a capital improvement and should not draw from the tree mitigation fund, arguing that tree mitigation money should be reserved for tree-related programs. Mr. O'Neill suggested the group avoid prescribing a specific allocation, and instead make a clear recommendation to town council that both undergrounding and tree planting should be funded adequately, leaving the specific budget decisions to council and staff. He noted that making it appear to be a zero-sum choice between the two would likely generate unnecessary political opposition. Ms. Farrell noted that the town already drew undergrounding funding from multiple sources including hospitality tax and infrastructure funds, and that the Public Services Committee will be discussing a more structured undergrounding funding program at an upcoming committee meeting. She suggested that the source of undergrounding funding would likely be addressed through that process. Ms. Mansour supported the revision, agreeing that the recommendation should express support for both undergrounding and tree planting and leave budget allocation decisions to leadership. The group agreed to revise the recommendation to support both programs, express the need for increased funding for tree programs, and leave the specific allocation of funds to council and staff. Chair McKee confirmed that the subtext of the recommendation would note support for undergrounding alongside tree planting, without framing them as competing priorities. Mr. Quick confirmed his support, noting the group should express that it was happy as long as both programs were adequately funded. Final Recommendations Chair McKee noted that the remaining items in the recommendations — related to single-family ordinance changes — were still in draft form pending the earlier discussions and would be finalized at the next meeting. Mr. O'Neill recommended that the group focus between now and the next meeting on: reviewing the recommendations for completeness, identifying any missing items, and providing feedback on the issue statements and benefit rationales supporting each recommendation, as those narrative elements would frame the introductory sections of the final report. Tree Task Force May 21, 2026 Page 19 of 19 Chair McKee proposed a timeline for revisions: staff would circulate an updated draft of the report, incorporating the funding recommendation revision and other agreed changes, with member feedback due by June 7. A second draft would follow during the first week of June, leaving approximately two weeks before the June 25 meeting. The group discussed whether a special meeting would be needed to resolve the remaining single-family issues. Mr. Grice suggested that rather than scheduling a standalone special meeting, the group could simply allow the June 25 meeting to run slightly longer if needed. O'Neill agreed, noting that with a well-prepared draft in advance, the group should be able to complete the report without a special meeting. Ms. Farrell reminded the group that the final report and its recommendations, once completed, would still need to go through the planning commission for a public hearing process before any ordinance amendments could be adopted. She noted that staff would be responsible for translating the task force's recommendations into formal ordinance language, which would require additional detail not necessarily within the scope of the task force's report. 7. Discuss Next Agenda Chair McKee noted that the agenda for the June meeting would largely mirror the current meeting's agenda, continuing with the work plan and moving toward a finalized draft of the report. The group confirmed that the outstanding single-family ordinance items — including the 16-inch protection threshold and the pine classification question — would be carried forward. The feedback deadline of June 7 was confirmed. The group noted that July would be the final meeting, at which the task force would aim to adopt the completed report and recommendations. 8. Adjourn There being no further business, Chair McKee declared the meeting adjourned at 10:05 AM. Respectfully submitted, Christine Barrett Clerk of Council May 21, 2026

Source: Town of Mount Pleasant website. First collected Oct 23, 2026.