_05042026-2178
Town of Mount Pleasant · Charleston County · meeting of May 4, 2026 · Minutes
Open the original document More from Town of Mount Pleasant
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
Bids and Purchases Committee
Monday, May 4, 2026
Municipal Complex, Council Chambers
100 Ann Edwards Lane, Mount Pleasant, SC 29464
Mi
nutes
Click here to listen to recording.
Powerpoint Presentation
1. Call To Order
Council Member Daniel Brownstein called the meeting to order with a
moment of silence at 8:15 a.m.
2. Approval Of Minutes From The April 6, 2026 Meeting
Council Member Crosby moved to approve; seconded by Council
Member Tinkey. All present voted in favor.
3. Public Comments
None.
4. Award Of A Contract For The Construction Of The Kenny Mile
Trail And The Park West Trail
Chief Financial Officer Tammy Harness presented the item. She
explained that the Town solicited bids from qualified contractors for two
related trail projects. For the Kenny Mile Trail, the scope of work
includes clearing and grading, selective tree removal, installation of a
concrete shared use path, construction of a composite deck boardwalk
segment, and landscaping, along with thermoplastic pavement markings
and signage. For the Park West Trail, the work involves the construction
of a 10-foot concrete shared use path running from US 17 to the
roundabout at Park West Boulevard, including removal of existing
concrete sidewalk, clearing and grading, selective tree removal, signage,
pavement markings, and drainage improvements. The combined
construction timeline for both projects is 400 calendar days from the
notice to proceed. Seven bids were received, and staff determined that
Bids & Purchases
May 4, 2026
Page 2
Braetr Construction was the lowest responsive and responsible bidder,
recommending a contract award in the amount of $1,777,954.50.
Council Member Tinkey expressed enthusiasm for the projects, noting
the Town's progress toward 42 miles of connected paths. He raised
questions regarding tree removal and the Town's commitment to tree
preservation and replanting. Deputy Director James Aton from
Engineering Development Services, responded that much of the
alignment had already been cleared as a result of a Mount Pleasant
Water Works utility project in 2016, so tree removal along most of the
route would be minimal. He noted that a section of boardwalk —
approximately 360 feet in length, located in front of the Taco Bell near
the South Morgans Point intersection — required the removal of several
trees in order to preserve freshwater wetlands and meet DOT offset
requirements. Deputy Director Aton indicated that mitigation payments
would be made into the Town's tree mitigation bank, and that the
landscaping subcontractor would work to identify areas for additional
plantings where feasible, acknowledging constraints posed by an
overhead power line easement in the area.
Council Member Tinkey emphasized the importance of shade along
trails and expressed appreciation for the effort to find replanting
opportunities.
Council Member Brownstein noted that this project had been in
development for some time and reflected the vision of the Kenny Mile
Foundation, which identified this corridor as an initial area to honor its
namesake. Deputy Director Aton confirmed this, adding that the
southern end of the project will ultimately connect to the planned
Highway 41 widening project, which will extend the path to Billy's Swails
Boulevard to Highway 41, while the northern end will tie into existing
paths on Park West Boulevard. Council Member Brownstein observed
that this stretch represents a meaningful connection between the Park
West neighborhoods and the broader trail network, enabling residents to
walk to nearby commercial areas rather than drive.
Council Member Tinkey moved to approve; seconded by Council
Member Crosby. All present voted in favor.
5. Award Of A Contract For The Construction Of The
Commonwealth Drive Crossline Replacement
Chief Financial Officer Tammy Harness presented the item. She
explained that the Town solicited best value bids for the Commonwealth
Drive crossline replacement project. The project will replace existing
Bids & Purchases
May 4, 2026
Page 3
dual 48-inch reinforced concrete pipes — more than 50 years old and in
deteriorated condition — with larger capacity culverts. The new
infrastructure will consist of a double 10-by-5-foot concrete box culvert at
the Commonwealth Road crossing at Alston Creek. The scope of work
includes removal of the existing pipes, excavation and installation of the
new box culvert, associated grading, roadway reconstruction and
paving, utility coordination, storm drainage improvements, maintenance
of traffic, pavement markings, erosion and sediment control,
landscaping, and grassing. The construction timeline is 6 months from
the notice to proceed. Five bids were received, and staff determined that
Truluck Construction, Inc. was the best value responsive and
responsible bidder, recommending a contract award in the amount of
$1,013,843.75.
Project Engineer Marrisa Noble, from Engineering Development
Services provided additional technical context. She clarified that the box
culverts are 10-by-6 feet but must be buried one foot per Army Corps
requirements. She explained that the larger culverts will allow tidal water
to equalize more quickly, reducing the time that water sits on roads in
the area — a particularly important improvement given the
neighborhood's low elevation. Ms. Noble noted that the area was
originally built in the county before being annexed to Mount Pleasant
and described it as extremely low-lying.
Council Member Tinkey inquired whether the project area was in the
vicinity of Darrell Creek, a known flooding concern. Ms. Noble confirmed
this, characterizing it as a critical project for that neighborhood. Council
Member Tinkey also asked about tree removal and preservation, to
which Ms. Noble responded that no protected trees would be removed
— only smaller trees along the right-of-way line. She indicated she
intended to have a Town arborist on-site during any work involving large
root systems.
Council Member Brownstein acknowledged the project's significance,
noting visible flooding in the Carolina Park area and the broader
vulnerability of the neighborhood to future tidal flooding. Ms. Noble also
clarified that trail improvements are included in the scope: the Darrell
Creek Trail crossing, which currently requires users to cross at what was
described as a dangerous turn, will be relocated so that trail users no
longer need to cross at that point.
Regarding traffic disruption, Ms. Noble stated that the road would only
be fully closed for a tight window of 28 working days, after which both
lanes would remain open with possible minor shifting. She confirmed
that the Town would notify the public through all social media channels
Bids & Purchases
May 4, 2026
Page 4
and coordinate with fire and police, and that a full detour plan was in
place.
Council Member Tinkey moved to approve; seconded by Council
Member Crosby. All present voted in favor.
6. Adjourn
There being no further business, the meeting adjourned at 8:26 a.m.
Respectfully submitted by,
Gina Artrip
May 4, 2026