RecordWell Data

_05042026-2178

Town of Mount Pleasant · Charleston County · meeting of May 4, 2026 · Minutes

Open the original document More from Town of Mount Pleasant

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

Bids and Purchases Committee Monday, May 4, 2026 Municipal Complex, Council Chambers 100 Ann Edwards Lane, Mount Pleasant, SC 29464 Mi nutes Click here to listen to recording. Powerpoint Presentation 1. Call To Order Council Member Daniel Brownstein called the meeting to order with a moment of silence at 8:15 a.m. 2. Approval Of Minutes From The April 6, 2026 Meeting Council Member Crosby moved to approve; seconded by Council Member Tinkey. All present voted in favor. 3. Public Comments None. 4. Award Of A Contract For The Construction Of The Kenny Mile Trail And The Park West Trail Chief Financial Officer Tammy Harness presented the item. She explained that the Town solicited bids from qualified contractors for two related trail projects. For the Kenny Mile Trail, the scope of work includes clearing and grading, selective tree removal, installation of a concrete shared use path, construction of a composite deck boardwalk segment, and landscaping, along with thermoplastic pavement markings and signage. For the Park West Trail, the work involves the construction of a 10-foot concrete shared use path running from US 17 to the roundabout at Park West Boulevard, including removal of existing concrete sidewalk, clearing and grading, selective tree removal, signage, pavement markings, and drainage improvements. The combined construction timeline for both projects is 400 calendar days from the notice to proceed. Seven bids were received, and staff determined that Bids & Purchases May 4, 2026 Page 2 Braetr Construction was the lowest responsive and responsible bidder, recommending a contract award in the amount of $1,777,954.50. Council Member Tinkey expressed enthusiasm for the projects, noting the Town's progress toward 42 miles of connected paths. He raised questions regarding tree removal and the Town's commitment to tree preservation and replanting. Deputy Director James Aton from Engineering Development Services, responded that much of the alignment had already been cleared as a result of a Mount Pleasant Water Works utility project in 2016, so tree removal along most of the route would be minimal. He noted that a section of boardwalk — approximately 360 feet in length, located in front of the Taco Bell near the South Morgans Point intersection — required the removal of several trees in order to preserve freshwater wetlands and meet DOT offset requirements. Deputy Director Aton indicated that mitigation payments would be made into the Town's tree mitigation bank, and that the landscaping subcontractor would work to identify areas for additional plantings where feasible, acknowledging constraints posed by an overhead power line easement in the area. Council Member Tinkey emphasized the importance of shade along trails and expressed appreciation for the effort to find replanting opportunities. Council Member Brownstein noted that this project had been in development for some time and reflected the vision of the Kenny Mile Foundation, which identified this corridor as an initial area to honor its namesake. Deputy Director Aton confirmed this, adding that the southern end of the project will ultimately connect to the planned Highway 41 widening project, which will extend the path to Billy's Swails Boulevard to Highway 41, while the northern end will tie into existing paths on Park West Boulevard. Council Member Brownstein observed that this stretch represents a meaningful connection between the Park West neighborhoods and the broader trail network, enabling residents to walk to nearby commercial areas rather than drive. Council Member Tinkey moved to approve; seconded by Council Member Crosby. All present voted in favor. 5. Award Of A Contract For The Construction Of The Commonwealth Drive Crossline Replacement Chief Financial Officer Tammy Harness presented the item. She explained that the Town solicited best value bids for the Commonwealth Drive crossline replacement project. The project will replace existing Bids & Purchases May 4, 2026 Page 3 dual 48-inch reinforced concrete pipes — more than 50 years old and in deteriorated condition — with larger capacity culverts. The new infrastructure will consist of a double 10-by-5-foot concrete box culvert at the Commonwealth Road crossing at Alston Creek. The scope of work includes removal of the existing pipes, excavation and installation of the new box culvert, associated grading, roadway reconstruction and paving, utility coordination, storm drainage improvements, maintenance of traffic, pavement markings, erosion and sediment control, landscaping, and grassing. The construction timeline is 6 months from the notice to proceed. Five bids were received, and staff determined that Truluck Construction, Inc. was the best value responsive and responsible bidder, recommending a contract award in the amount of $1,013,843.75. Project Engineer Marrisa Noble, from Engineering Development Services provided additional technical context. She clarified that the box culverts are 10-by-6 feet but must be buried one foot per Army Corps requirements. She explained that the larger culverts will allow tidal water to equalize more quickly, reducing the time that water sits on roads in the area — a particularly important improvement given the neighborhood's low elevation. Ms. Noble noted that the area was originally built in the county before being annexed to Mount Pleasant and described it as extremely low-lying. Council Member Tinkey inquired whether the project area was in the vicinity of Darrell Creek, a known flooding concern. Ms. Noble confirmed this, characterizing it as a critical project for that neighborhood. Council Member Tinkey also asked about tree removal and preservation, to which Ms. Noble responded that no protected trees would be removed — only smaller trees along the right-of-way line. She indicated she intended to have a Town arborist on-site during any work involving large root systems. Council Member Brownstein acknowledged the project's significance, noting visible flooding in the Carolina Park area and the broader vulnerability of the neighborhood to future tidal flooding. Ms. Noble also clarified that trail improvements are included in the scope: the Darrell Creek Trail crossing, which currently requires users to cross at what was described as a dangerous turn, will be relocated so that trail users no longer need to cross at that point. Regarding traffic disruption, Ms. Noble stated that the road would only be fully closed for a tight window of 28 working days, after which both lanes would remain open with possible minor shifting. She confirmed that the Town would notify the public through all social media channels Bids & Purchases May 4, 2026 Page 4 and coordinate with fire and police, and that a full detour plan was in place. Council Member Tinkey moved to approve; seconded by Council Member Crosby. All present voted in favor. 6. Adjourn There being no further business, the meeting adjourned at 8:26 a.m. Respectfully submitted by, Gina Artrip May 4, 2026

Source: Town of Mount Pleasant website. First collected Oct 23, 2026.