RecordWell Data

Planning Commission: Maybank PUD

City of Charleston · Berkeley County · meeting of Oct 21, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

PAGE 1 MAYBANK PUD AUGUST 2026 DEVELOPMENT GUIDELINES FOR THE DEVELOPMENT GUIDELINES FOR THE Maybank PUDMaybank PUD ID#: PUD2026-000033ID#: PUD2026-000033 CHARLESTON, SOUTH CAROLINACHARLESTON, SOUTH CAROLINA MAYBANK PUD PAGE 2 AUGUST 2026 4 Section 1 - Relationship to Zoning Ordinance of the City of Charleston 5 Section 2 - Introduction 5 2.01 Project Location 5 2.02 TMS # / Current Zoning / Property Owner / Total Area 6 2.03 Background Information 6 2.04 Development Summary 6 2.05 Goals for the Project 7 Section 3 - Land Use 7 3.01 Area Breakdown 7 3.02 Net Density 7 3.03 Development Pods 7 Section 4 - Zoning Criteria 7 4.01 Commercial District (CD) 10 4.02 Residential District (RD) 11 Section 5 - Open Space 11 5.01 Total Open Space Area 11 5.02 Total Usable Open Space 12 5.03 Conceptual Plan for Open Space 12 5.04 Ownership and Maintenance of Open Space 12 5.05 Open Space Definitions from the City of Charleston Zoning Ordinance 13 Section 6 - Buffers 13 6.02 Maybank Highway Buffer 14 6.03 Fern Hill Drive Buffer 14 6.04 Ownership and Maintenance 14 Section 7 - Tree Summary 14 7.01 Summary of Existing Trees 14 7.02 Tree Protection Standards Table of Contents PAGE 3 MAYBANK PUD AUGUST 2026 15 Section 8 - Right-of-Way 15 8.01 Road Ownership 15 8.02 Dimensions 15 8.03 Sidewalks 15 8.04 Street Lights / Street Trees 15 8.05 Emergency/Public Service Access 16 Section 9 - Drainage Basin Analysis 16 9.01 Flood zone 16 9.02 Topography 16 9.03 Wetland Verification 16 9.04 Preliminary Stormwater Techniques 16 Section 10 - Traffic Study 16 10.01 Traffic Study (Provided Under Separate Cover) 17 Section 11 - Cultural Resources 17 11.01 Information Resource and Findings 17 Section 12 - Letters of Coordination 17 12.01 Service Providers 18 Section 13 - Additional Development Criteria 18 13.01 Signage 18 13.02 Phasing 18 13.03 Design Review Board 19 Exhibits MAYBANK PUD PAGE 4 AUGUST 2026 Development Guidelines Maybank Planned Unit Development Charleston, South Carolina (City of Charleston) Section 1 - Relationship to Zoning Ordinance of the City of Charleston Relationship to the Zoning Ordinance The Development Guidelines and Land Use Plan for the Maybank Planned Unit Development (PUD), attached hereto and made a part of hereof, are part of the PUD conditional use Master Plan application submitted in accordance with the Zoning Ordinance of the City of Charleston, Article 2, Part 7 Sections 54-250, et seq. The Zoning Ordinance of the City of Charleston is incorporated herein by reference, except as amended herein. The Zoning Ordinance of the City of Charleston (“Zoning Ordinance”) is incorporated by reference, except as amended by these development guidelines (“Guidelines”). No person shall erect or alter any building, structure, or sign on any tract of land or use any tract of land within the Maybank PUD (“the PUD”) except in conformance with these guidelines and regulations. Unless modified herein, definitions of terms used in the Maybank PUD Development Guidelines shall follow definitions listed in the Zoning Ordinance of the City of Charleston, as amended from time to time. Administration and enforcement of the Maybank PUD Master Plan shall follow Article 9 of the Zoning Ordinance of the City of Charleston. The Maybank PUD Master Plan was approved by Charleston City Council on Ordinance Number PAGE 5 MAYBANK PUD AUGUST 2026 Section 2 - Introduction LOCATION MAP - NOT TO SCALE 2.01 Project Location The PUD site is located in the City of Charleston, South Carolina on Johns Island off of Maybank Highway between Fern Hill Drive and Southwick Drive. The project is made up of seven parcels; two of the seven parcels exists in Charleston County and will be annexed into the City of Charleston as a requirement of this PUD. 2.02 TMS # / Current Zoning / Property Owner / Total Area PARCEL INFORMATION TMS #’S CURRENT ZONING OWNER TOTAL ACREAGE 279-00-00-006 (Charleston County) Overlay District Bright Oak Properties LLC 2.29 AC 279-00-00-288 CT (Commercial Transitional) Charleston Real Estate, Company LP 0.52 AC 279-00-00-008 CT (Commercial Transitional) Charleston Real Estate, Company LP 2.30 AC 279-00-00-009 CT (Commercial Transitional) Charleston Real Estate, Company LP 1.72 AC 279-00-00-017 SR-1 (Single-Family Residential 1) Fenwick Hills Corp 2.48 AC 313-00-00-047 RR-1 (Rural Residential 1) Bailey Dennis R, Bailey Sherry B 5.89 AC 313-00-00-237 (Charleston County) R-4 (Low Density Residential District) Rosemary Lynn Knox 0.41 AC Total Acreage: 15.61 AC MAYBANK PUD PAGE 6 AUGUST 2026 2.03 Background Information The site consists of seven parcels, most of which are undeveloped. However, two parcels have been developed to different degrees. Parcel 279-00-00-006 is the property with Bright Oak Preschool Academy which is a daycare facility in operation. Parcel 313-00-00-047 has a two story home on it, which will not remain, and a gravel drive. Five of the parcels are located within the City of Charleston, and two will be annexed from Charleston County. This PUD is structured to align with the City of Charleston’s planning objectives by integrating a context-sensitive approach that respects the natural character of Johns Island. The development incorporates appropriate residential density, substantial landscape buffering, and a complementary mix of residential and commercial uses to support a walkable, mixed- use community. The development’s urban form and architectural character are intended to reflect the qualities of a traditional neighborhood, while preserving key environmental features of the site. A connected street network is proposed to bisect Maybank Highway, enhancing multimodal connectivity and supporting the long-term mobility goals for the area. 2.04 Development Summary The Maybank PUD proposes two land use districts: the Commercial District (CD) and the Residential District (RD). Potential future development will follow the criteria outlined in this PUD. This PUD aligns with the Charleston City Plan and future land use designations, supporting a mix of housing types. The proposed land uses are consistent with the area’s suburban and neighborhood edge classifications. 2.05 Goals for the Project This PUD is designed to advance the goals of the Charleston City Plan, particularly its emphasis on creating a connected, inclusive, and resilient community. The development supports a mix of housing types that align with the City’s future land use designations and housing affordability strategies. In keeping with the Resilience and Equity Framework of the City Plan, the PUD promotes equitable access to housing, transportation, and green space, while preserving the natural character of Johns Island within the Urban Growth Boundary. Connectivity is a central feature of the PUD, reflecting the priorities of the Johns Island Community Plan and the Citywide Transportation Plan. The alignment of a newly proposed road with St. Johns Woods Parkway and the addition of a traffic signal will create a critical east-west connection, improving circulation and reducing pressure on Maybank Highway. The internal street network is designed to support multimodal access, with pedestrian pathways that link to surrounding neighborhoods and future transit corridors, consistent with the People Pedal Plan and the proposed Five Lakes Trail of the Johns Island Community Greenways Plan which runs parallel to Maybank Highway and connects the Whitney Lake subdivision with Johns Island Park. The Commercial District will unify the Bright Oak Preschool Academy property, with a residential neighborhood. This supports the City Plan’s call to strengthen local institutions PAGE 7 MAYBANK PUD AUGUST 2026 and ensure long-term community benefit. The PUD emphasizes environmental stewardship through use of native vegetation. These efforts reflect a shared commitment to climate resilience, ecological health, and sustainable growth—values that align with the City’s long- term vision for a thriving, balanced community. Section 3 - Land Use 3.01 Area Breakdown The proposed development will contain commercial uses and residential uses. This PUD will categorize the development into two districts; Commercial District (CD) and Residential District (RD). Note: Acreages are based on the plats included in the appendix of this document. 3.02 Net Density 3.03 Development Pods Commercial District (CD): The Commercial District shall adhere to the City of Charleston’s Zoning Ordinance; Article 3, Part 1 for General Business Non-Residential except as stated otherwise within this document. Residential District (RD): The Residential District shall adhere to the City of Charleston’s Zoning Ordinance; Article 3, Part 1 - GB Residential for Single-family detached development except as otherwise stated in this document. Attached residential shall adhere to the City of Charleston’s Zoning Ordinance Article 3, Part 11 - One-Family Attached Dwelling - Section 54-353 except as stated otherwise in this document. Section 4 - Zoning Criteria 4.01 Commercial District (CD) A. Land Uses: The Commercial District development area allows General Business (GB) land uses as set within the City of Charleston’s Zoning Ordinance Article 2, Part 3 - Table of Permitted Uses. LAND USE TOTAL ACREAGE HIGHLAND ACREAGE WETLAND ACREAGE Commercial 2.29 1.90 0.39 Residential 13.32 11.97 1.35 GROSS ACRES NET ACRES (HIGHLAND) MAXIMUM DWELLING UNITS ALLOWED NET DENSITY 15.61 13.87 69 DU 5 DU/AC MAYBANK PUD PAGE 8 AUGUST 2026 Prohibited land uses within the CD include the following: • Agriculture, stables / riding stables, forestry or fishing / commercial fishing • Mining and quarrying • Construction with the exception of offices only • Manufacturing of textiles, paper and allied products, chemicals and allied products, petroleum, rubber / miscellaneous plastic products, leather / leather products, metals / metal products, industrial and commercial machinery and computer equipment, transportation and miscellaneous manufacturing industries not elsewhere classified • Railroad transportation, terminal and joint terminal maintenance facilities for motor freight transportation, shipping container storage (outdoor), water transportation or any kind, transportation by air, stables, transportation services not elsewhere classified, communications services not elsewhere classified including towers, gas production and distribution, water treatment, sanitary services, sewage treatment systems, and refuse systems • Wholesale trade storage yards other than for vehicles or boats, wholesale trade junk yards, scrap yards or auto salvage yards, wholesale trade of chemical and allied products, petroleum and petroleum products, petroleum bulk stations and terminals, petroleum and petroleum products wholesalers, nondurable goods, mobile homes dealers and nonstore retailers • Cemeteries • Camps / trailering parks, fraternity / sorority houses, dormitories, yacht brokering, racing including track operation, casinos, outdoor shooting range, riding stables, health services • Correctional institutions • Water storage tanks • Gasoline service stations • Boat dealers • Recreational and utility trailer dealers • Short term lender • Farms and crop production • Casinos • Public, not for profit, golf courses and private or for-profit golf courses • Shooting ranges • Correctional institutions • Arboreta, botanical and zoological gardens • Laundry / power laundries, cleaning and garment services, garment pressing and agents for laundries and dry cleaners, linen supply, diaper service, coin operated laundries and dry cleaning and dry cleaning plants • Private Households - One family detached dwellings, One family attached dwellings, Multi-family dwellings / multi-family dwellings for the elderly, mobile home parks / mobile homes • Adult Uses as described in the City of Charleston Zoning Ordinance PAGE 9 MAYBANK PUD AUGUST 2026 B. Dimensional Development & Parking Standards: The Commercial District (CD) shall allow the following dimensional standards. Zoning Criteria items not specifically addressed within this PUD shall comply with the City of Charleston (GB) Zoning Requirements. The dimensional standards for the CD were influenced by Charleston County’s James Island Maybank Highway Corridor Overlay Zoning District. COMMERCIAL DISTRICT - DIMENSIONAL STANDARDS WITHOUT 50’ RIGHT-OF-WAY DEDICATION Minimum Lot Width 50 feet Minimum Setbacks None required Maybank Highway R/W Buffer 75 feet Maximum Building Coverage - Nonresidential and Office Development 30% Maximum Individual Building Footprint 5,000 sf Maximum Impervious Surface Coverage - Residential Development 40% of lot or as allowed by the current edition of the City of Charleston Stormwater Manual Maximum Building Height 35 feet / 2.5 stories Required Parking Per City of Charleston guidelines* COMMERCIAL DISTRICT - DIMENSIONAL STANDARDS WITH 50’ RIGHT-OF-WAY DEDICATION Minimum Lot Width 50 feet Minimum Setbacks Equivalent to required buffer Maybank Highway R/W Buffer 75 feet Maximum Building Coverage - Nonresidential and Office Development 60% Maximum Individual Building Footprint 20,000 sf Maximum Impervious Surface Coverage - Residential Development 60% of lot or as allowed by the current edition of the City of Charleston Stormwater Manual Maximum Building Height 45 feet / 3.5 stories Required Parking Per City of Charleston guidelines* MAYBANK PUD PAGE 10 AUGUST 2026 4.02 Residential District (RD) A. Land Uses: The Residential District (RD) Permitted Land Uses include all principle use types by right per City of Charleston’s Ordinance; Article 2 - Land Use Regulations, Part 3 - Table of Permitted Uses - Division I: Services - 88. Private Households (number per lot) except as stated otherwise in this document. Within the RD land and buildings may be erected, altered, or used for the following permitted uses: 1. One-family attached and detached dwelling units. 2. Home occupations subject to permitting procedures and restrictions for Home Occupations per Section 54-211 of the City of Charleston Zoning Ordinance 3. Corner lots shall meet City of Charleston vision clearance triangle requirements. 4. Steps, balconies, patios, open stairways, entry covers, bay windows, fire boxes, and decks may extend fully into setbacks, but in no instance can they extend into the right-of-way or drainage easements. 5. Eaves may extend two feet (2’) into setbacks, however in no instance can any structure or eave extend into the right-of-way or drainage easements. 6. Fences may be up to 8’ in height. 7. One group of up to (6) model homes can be permitted and constructed prior to final plat for the purpose of modeling the product and for use as a marketing/sales office. Certificate of Construction Completion shall not be issued until the final plat has been recorded. 8. One driveway with a maximum width of 11 feet at the right-of-way shall be permitted in the front yard. There is no maximum width for driveways along a rear alley. 9. On-street parking shall be provided as required in the City of Charleston Zoning Ordinance - Section 54-821 - Street design standards - Table 8.1: Minimum Street Widths - f. Prohibited RD land uses include the following: • Cemeteries • Casinos • Shooting ranges • Correctional institutions • Adult Uses as described in the City of Charleston Zoning Ordinance PAGE 11 MAYBANK PUD AUGUST 2026 B. Dimensional Development & Parking Standards: The Residential District (RD) shall allow single family attached and detached dwelling units with the following dimensional standards. Zoning Criteria not specifically addressed within this document shall adhere to City of Charleston Code of Ordinances. *Note: Accessory structures must be placed behind the front facade of the principal structure. Section 5 - Open Space 5.01 Total Open Space Area • 15.61 Gross Acres x 20% = 3.12 Acres of Open Space Required (Minimum of 20% of Gross area required) 5.02 Total Usable Open Space • 3.12 Acres of Open Space x 25% = 0.78 Acres of Usable Open Space Required (Minimum 25% of total open space required) RESIDENTIAL DISTRICT - DIMENSIONAL STANDARDS SINGLE FAMILY ATTACHED DETACHED Minimum Lot Area 1,200 sf 3,000 sf Minimum Lot Width 20 feet 30 feet Minimum Lot Width for cul-de-sacs 16 feet 30 feet Minimum Lot Depth 60 feet 85 feet Minimum Setbacks: Front 20 feet 20 feet Side (for end units) 10 feet 5 feet Rear 5 feet 10 feet Accessory Building Setbacks 5’ side and 5’ rear* Maximum Lot Occupancy 60% of lot 60% of lot Maximum Height 45’ / 3.5 stories 45’ / 3.5 stories Minimum Off-Street Parking 2 per unit 2 per unit Maximum units in a row 6 units OPEN SPACE REQUIREMENT TABLE USE DISTRICT GROSS ACREAGE OPEN SPACE REQUIREMENT Commercial District 2.29 AC 0.46 AC Residential District 13.32 AC 2.66 AC Total 15.61 AC 3.12 AC MAYBANK PUD PAGE 12 AUGUST 2026 5.03 Conceptual Plan for Open Space The Maybank PUD will incorporate a thoughtfully designed network of open spaces that promote recreation, connectivity, and environmental stewardship. These areas will include active and passive zones all intended for the enjoyment of residents and the broader community. Green spaces will be maintained by the Homeowners Association (HOA), Property Owners Assocation (POA) or a business entity to ensure long-term care and visual appeal. In accordance with the Johns Island Greenway Plan paths will be included outside of the right-of-ways in HOA areas with their placement to be discussed with the city’s Mobility Planner. Amenity areas will not be required to go through the City of Charleston’s Design Review Board (DRB) process. In accordance with City standards, no more than 50% of the total area of constructed water features or preserved wetlands may be counted toward required open space. However, designated buffer areas may be fully credited, reinforcing the PUD’s commitment to preserving natural features while enhancing community access to green space. Buffer areas may be counted towards useable open space. Proposed improvements within park areas (±5,000 SF) shall include one or a combination of the following: • Playground • Tables • Pavilions • Dog friendly areas • Outdoor fitness areas • Community gardens • Other amenity features may be allowed as approved by the City of Charleston’s TRC Proposed improvements withing pocket park areas (±2,000 SF) shall include one or a combination of the following: • Grills • Benches • Small tables • Lawn games • Pollinator gardens • Other amenity features may be allowed as approved by the City of Charleston’s TRC 5.04 Ownership and Maintenance of Open Space Open space within the Residential District shall be privately owned and maintained by the HOA for the use of the community. All open space within the Commercial District shall be maintained by a POA or owner of the property and shall be for use of all patrons. PAGE 13 MAYBANK PUD AUGUST 2026 5.05 Open Space Definitions from the City of Charleston Zoning Ordinance Section 54-120 - Definitions: Open Space: Any parcel or area of land or water essentially unimproved and set aside, dedicated, designated or reserved for public or private use or enjoyment, or for the use and enjoyment of owners and occupants of land adjoining or neighboring such open space. Open space shall not include streets, drives, off-street parking and loading areas, area so located or of such size or shape to have no substantial aesthetic or recreational value and any area within residential lots. Section 54-256 - PUD Zoning Regulations: Open Space. For PUD’s with a net acreage greater than ten (10) acres, a minimum of twenty (20) percent of the gross acreage shall remain as open space; twenty-five (25) percent of the required open space shall be developed and maintained as usable open space. Section 6 - Buffers 6.01 Required Landscape Buffers All buffer areas shall adhere to the City of Charleston’s Zoning Ordinance Article 3 - Site Regulations, Part 8 - Landscape Buffer Requirements except as otherwise stated within this PUD. All plant material is to be comprised of 100% native species. All efforts will be made to retain the existing trees within buffer areas. Existing vegetation may be used alone or in combination with new plantings to meet the Landscape Buffer Requirements. Within the Maybank development, no external land use buffers are required where Residential zoning directly abuts other Residential zoning. All required buffers must be fully installed prior to final plat approval. 6.02 Maybank Highway Buffer Note: Stormwater facilities are permitted in the back third (25’ zone) of the buffer and will be supplemented with appropriate plant material. BUFFER DEPTH AND PLANTING SCHEDULE Minimum Buffer Depth 75 feet Minimum Buffer Landscaping (Plants per 100 linear feet) Canopy Trees 9 Understory Trees (At least 50 percent evergreen) 12 Shrubs 60 Street Trees (May be counted toward canopy tree requirement) 2 Sidewalk Minimum 5’ width Street Lighting: per City of Charleston Park Dept. recommendations MAYBANK PUD PAGE 14 AUGUST 2026 6.03 Fern Hill Drive Buffer 6.04 Ownership and Maintenance All buffer areas in the Residential District areas shall be owned and maintained by the HOA (Homeowners Association). In the Commercial District, property owners must own and maintain all buffer areas located on their property. Section 7 - Tree Summary 7.01 Summary of Existing Trees Please see Exhibit B - Existing Conditions for the locations and size of all existing Protected and Grand Trees. As defined in the City of Charleston’s Zoning Ordinance a protected tree is any tree 8” or greater D.B.H and a grand tree is any tree 24” or greater in D.B.H., excluding pine trees and sweetgum trees. This PUD will be subject to the Tree Protection Requirements defined in Article 3 - Site Regulations, Part 6 - Tree Protection Requirements of the City of Charleston’s Zoning Ordinance; as currently defined at the time of the PUD Ordinance approval for the lifespan of the development. A local Certified Arborist evaluated the health and condition of all Grand Trees on site and a report will be provided to the City of Charleston planning staff at the time of submission of the construction drawings and/or variance request. 7.02 Tree Protection Standards Tree barricades shall be required to provide tree protection. All tree protection standards as described below are from Article 3 - Site Regulations, Part 6 - Tree Protection Requirements of the City of Charleston’s Zoning Ordinance, and shall be followed. (The following standards have not been altered from the ordinance that governed at the date of this PUD approval). 1. For protected trees twenty-three inches (23”) or less D.B.H. protective barricades BUFFER DEPTH AND PLANTING SCHEDULE Minimum Buffer Depth 10 feet Minimum Buffer Landscaping (Plants per 100 linear feet) Canopy Trees 3 Understory Trees (At least 50 percent evergreen) 3 Shrubs 20 An 8’ high opaque wall or fence shall be required within or adjacent to the land use buffer. PAGE 15 MAYBANK PUD AUGUST 2026 shall be placed a minimum distance of ten feet (10’) from the base of each pro- tected tree; and 2. For protected trees greater than twenty-three inches (23”) D.B.H. and grand trees protective barricades shall provide a diameter of protection around the tree equal in feet to the diameter breast height of the tree (i.e., a 24” diameter tree would require a 24-foot diameter protective barricade). Any request for removal or encroachment of a Grand Tree shall comply with the City of Charleston’s Zoning Ordinance; Sec. 54-329 - Standards for approval to remove trees. Section 8 - Right-of-Way 8.01 Road Ownership The PUD will be accessed via Maybank Highway, Southwick Drive, and Fern Hill Drive. These public road extensions will be constructed to meet the City of Charleston’s standards. Proposed interior drives shall be permitted and constructed by the Owner. Any alleys within the project will be privately owned and maintained by the HOA. Site entrance roadways and traffic signage shall conform to the Manual on Uniform Traffic Control Devices (MUTCD). Sight distance and visibility at all exits and/or intersections will be maintained in accordance with the SCDOT Access and Roadside Management Standards (ARMS) Manual. 8.02 Dimensions Road rights-of-way will vary based on ownership. The public street section shall include a 22’ minimum paved section, roll curb and gutter, and a verge for landscaping. Street sections may also be modified in order to preserve grand trees within the right-of-way if necessary. See Exhibit E at the end of the document for street sections. 8.03 Sidewalks Sidewalks throughout the development shall be concrete and a minimum of five feet (5’) in width on both sides of the street within the right-of-way. If sidewalks travel onto private property to avoid grand trees they shall require a public access easement. Sidewalks are not required where there are alleys. Sidewalks shall meet the ADA requirements and ADA compliant ramps shall be installed at street corners with sidewalks to provide accessible routes. DRC approval is required for any non-standard material within public rights-of-way. 8.04 Street Lights / Street Trees Street lights and street trees shall be installed per the requirements of the Department of Parks street design standards to the maximum extent possible. See Exhibit E at the end of this document for street sections. 8.05 Emergency/Public Service Access All rights-of-way shall accommodate emergency vehicles and public service vehicles. Access shall be provided to the community via an entrance from Maybank Highway and MAYBANK PUD PAGE 16 AUGUST 2026 Southwick Drive. At the end of the alley there is emergency only access. Section 9 - Drainage Basin Analysis 9.01 Flood zone The site lies within flood zone X as per FEMA Map Number 45019C0655K dates January 29, 2021 - City of Charleston 455412 / Charleston County Unincorporated Areas 455413. 9.02 Topography The site is gently sloping from Maybank Highway toward existing wetlands at the back of the property. The topography of the site ranges in elevation near the existing wetland areas. There is a drainage basin that cuts through the southern half of the property. 9.03 Wetland Verification An onsite wetland delineation was performed by Passerela resulting in a wetlands delineation dated March 13, 2025. The existing 1.35 acres of wetland on site is classified as “jurisdictional” by the US Army Corps of Engineers. See attached wetland exhibit by Passerela. A jurisdictional determination package has been sent to the Army Corps of Engineers. 9.04 Preliminary Stormwater Techniques The property will be developed using on-site detention systems and best management practices for both water quantity and quality control. Proposed drainage for the site will be managed via a network of storm pipes, wet ponds, and outfall structures as required for release into the wetlands on the site. Ponds may include bulkheads or walls to increase storage capacity or improve aesthetics. In such cases, littoral shelves shall not be required. Parking and stormwater management systems within private commercial areas shall be maintained by the developer, owner, or HOA. The City of Charleston shall own and maintain stormwater management system components that are constructed under or collect stormwater runoff from a City owned road. The site stormwater management system must meet all applicable State and Federal stormwater regulations. Low Impact Design (LID) and green infrastructure techniques are allowed and encouraged to address stormwater. Section 10 - Traffic Study 10.01 Traffic Study (Provided Under Separate Cover) A traffic study will be conducted under separate cover and provided to the South Carolina Department of Transportation (SCDOT) at the time of completion. SCDOT and the City of Charleston Department of Traffic and Transportation will review the traffic study and work with the developer to ensure that traffic safety and traffic operations in and around the site are maintained as the project moves forward during construction permitting. PAGE 17 MAYBANK PUD AUGUST 2026 Section 11 - Cultural Resources 11.01 Information Resource and Findings The data research from The State Historic Preservation Office (SHPO) identified no archaeological sites or isolated finds that would be considered eligible for further review. This tract is located in South Carolina’s Coastal Zone of Johns Island in Charleston County. Johns Island is considered an erosional remnant island. This area is primarily agriculturally affected with good soils. Section 12 - Letters of Coordination 12.01 Service Providers The community will be served by the following service providers which have submitted letters indicating willingness and sufficient capacity to serve the proposed development. These letters are attached in the supporting Exhibits section which follows. Potable Water Service The St. Johns Water Company provides potable water service to this area of Johns Island. A 16” water main is located 700 feet from Fern Hill Drive on Maybank Highway. Sanitary Sewer Service The sewer system will be coordinated and dedicated to CWS. Electric Electric services will be provided by Berkeley Electric Cooperative. Gas Gas services will be provided by Dominion. Telephone & Cable Phone, cable, and internet service may be coordinated with and provided by Xfinity, AT&T or other available providers at the time of installation. Schools The site is located within the Charleston County School District and area schools include Angel Oak Elementary, Haut Gap Middle School, and St Johns High School. Emergency Services Emergency services will be provided by the City of Charleston. MAYBANK PUD PAGE 18 AUGUST 2026 Section 13 - Additional Development Criteria 13.01 Signage All signs will require a building permit. Signs on the property shall adhere to the City of Charleston Zoning Ordinance Article 4, except where otherwise stated in this PUD document. All signage shall meet the City of Charleston’s vision clearance triangle requirements and be approved by the City Design Review Board (DRB); with the exception of internal neighborhood signage used for providing direction to on site amenities and/or structures. Any signage proposed to be within a City of Charleston right-of-way shall require approval from the City of Charleston Engineering Department. The signs for the existing daycare shall remain in their current locations. A new sign for the residential community shall be permitted along the Maybank Highway frontage on the side of the entry into the project. Neighborhood identification signs may also be placed at secondary entrances to adjacent parcels. Additional identification and directional signage may be used within the neighborhood for identification of community amenities. These signs shall not require City Design Review Board approval. Temporary signs will be permitted per the City of Charleston’s Zoning Ordinance - Section 54- 411. 13.02 Phasing The proposed development may be designed and built in phases. Sales and/or construction trailers will be allowed on HOA areas or designated lots prior to the recording of the bonded plats. Site plan review and issuance of clearing and grading permits are required prior to the issuance of the required permit. In all cases where bondable items are required prior to the approval of the final plat of the property, bondable items shall either be installed, inspected and deemed acceptable by the City, or the Owner shall provide a performance bond, letter of credit, or other security acceptable to the City in the amount of 150% of construction as a guarantee that the work will be performed. Bondable items shall be contingent upon approval of encroachment permit and construction plans by the City. 13.03 Design Review Board If and when a property within the Commercial District is redeveloped, only the Commercial District property shall be under the purview of the City’s Design Review Board (DRB). All development within the residential district is not subject to the City of Charleston’s Design Review Board (DRB). PAGE 19 MAYBANK PUD AUGUST 2026 Exhibits A. Aerial B. Existing Conditions C. Land Use D. Open Space and Buffers E. Road Layout F. Drainage G. Utilities H. Signage I. Road Cross Section: Type A J. Road Cross Section: Type B K. Road Cross Section: Type B - On-street parking on one side L. Road Cross Section: Type C M. Maybank Highway Buffer N. Fern Hill Drive Buffer O. Recorded Plats P. Letters of Coordination Q. Traffic Study (provided under separate cover) R. Wetland Delineation 1.5'12'11'12'1.5'5'5'2'2'57'5'LEGENDPROPERTY LINEPUD BOUNDARY COOPER LAW FIRMMAYBANK PUDTITLE:PROJECT:CLIENT: THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (A) AERIAL EXHIBIT Aug 19, 2026 9:03am by: Crystal.AponteAERIAL EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT A8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS. 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 SOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'S WOODS PKWY NORTH 7/7.5/10" WATER OAK(D) 12.5/13" WATER OAK(D) 12.5/15" MULBERRY(D) 13/14" WATER OAK(D) 31" RED OAK(D) 7/17" WATER OAK(D) 24" BLACK GUM(D) 16/16" RED OAK(C) 28/55" LIVE OAK(C) 60" LIVE OAK(B) 5/6/6/8/12" WATER OAK(D) 9/9/9" WATER OAK(D) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 25" WATER OAK(D) 20/23" LIVE OAK(C) 18/23" LIVE OAK(C) 12/15" WATER OAK(C) 14/24" RED OAK(D) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 26" LIVE OAK(B) 34" MAGNOLIA(C) 26" WATER OAK(D) 24" WATER OAK(C) 24" LIVE OAK(C) 32" WATER OAK(C) 15/22" WATER OAK(D) 3/7/9/11" WATER OAK(D) 3/7/9/11" WATER OAK(D) 3/7/9/11" WATER OAK(D) 25" WATER OAK(D) 24" WATER OAK(D) 14/16" WATER OAK(NON GRADED) 25" WATER OAK(D) 3/7/7/12" MAPLE(D) 10/16" MAPLE(D) COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (B) EXISTING CONDITIONS EXHIBIT Aug 19, 2026 9:03am by: Crystal.AponteEXISTING CONDITIONS EXHIBITSHEET:EXHIBIT B8/19/2026 GRADE A GRADE DGRADE FGRADE B TREE PROTECTION ZONEGRADE C TITLE:PROJECT:CLIENT:JOB NUMBER:SCALE:DATE:0182781001" = 150' NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THE PLANSMAY BE ALTERED BY SEPARATE SUBMITTAL OFINDIVIDUAL SITE PLANS.NORTH SOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'SWOODS PKWY LEGENDPROPERTY LINEPUD BOUNDARY TREE GRADES: 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 EXISTING CONDITIONS NOTES:1.EXISTING CONDITIONS SHOWN HEREON ARE FROMA SURVEY FILE PROVIDED BY HLA, INC. DATED03/13/2025. WETLANDS SHOWN WERE DELINEATEDIN THE FIELD BY PASSARELLA AND ASSOCIATES.2.UTILITIES MAY EXIST WHICH ARE NOT SHOWN ONTHE PLANS. THE CONTRACTOR SHALL BERESPONSIBLE FOR CONTACTING ALL UTILITYCOMPANIES HAVING UTILITIES WITHIN ORADJACENT TO THE WORK AREA. THECONTRACTOR SHALL HAVE THE UTILITIES FIELDLOCATED AND COORDINATE WITH THE UTILITYCOMPANIES TO HAVE CONFLICTS RELOCATEDWHEN NECESSARY OR ADAPTED FOR TIE-INS.3.THE PROJECT SITE DOES NOT LIE WITHIN A FLOODHAZARD AREA PER FIRM PANEL 45019C0655KDATED 01/29/2021. 3294 MAYBANK HWYJOHNS ISLAND, SC 29455 1730 FERNHILL DRJOHNS ISLAND, SC 29455 1738 FERNHILL DRJOHNS ISLAND, SC 29455 3280 MAYBANK HWYJOHNS ISLAND, SC 29455 SOUTHWICK DR - MAINTAINED BY STATE FERN HILL DR - MAINTAINED BY COUNTY WETLANDSMUNICIPAL BOUNDARY 1.5'12'11'12'1.5'5'5'2'2'57' BRIGHT OAKPRESCHOOLACADEMY 5' 60" LIVE OAK(B) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 18/23" LIVE OAK(C) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 14/16" WATER OAK(NON GRADED) 10/16" MAPLE(D) COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (C) LAND USE EXHIBIT Aug 19, 2026 9:03am by: Crystal.AponteLAND USE EXHIBITSHEET:EXHIBIT C8/19/2026 COMMERCIAL DISTRICT (CD)2.29 ACRES (15%)RESIDENTIAL DISTRICT (RD)13.32 ACRES (85%)DENSITY: 4.65 DU/ACMAX ALLOWED: 69 UNITSJOB NUMBER:SCALE:DATE:0182781001" = 150' NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH SOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'SWOODS PKWYLEGENDPROPERTY LINEPUD BOUNDARY 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 WETLANDS BRIGHT OAKPRESCHOOLACADEMY 60" LIVE OAK(B) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 18/23" LIVE OAK(C) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 14/16" WATER OAK(NON GRADED) 10/16" MAPLE(D) BRIGHT OAKPRESCHOOLACADEMY 7/7.5/10" WATER OAK(D) 12.5/13" WATER OAK(D) 12.5/15" MULBERRY(D) 13/14" WATER OAK(D) 31" RED OAK(D) 7/17" WATER OAK(D) 24" BLACK GUM(D) 16/16" RED OAK(C) 28/55" LIVE OAK(C) 5/6/6/8/12" WATER OAK(D) 9/9/9" WATER OAK(D)25" WATER OAK(D) 20/23" LIVE OAK(C) 12/15" WATER OAK(C)14/24" RED OAK(D) 26" LIVE OAK(B) 34" MAGNOLIA(C)26" WATER OAK(D)24" WATER OAK(C) 24" LIVE OAK(C) 32" WATER OAK(C) 15/22" WATER OAK(D) 3/7/9/11" WATER OAK(D)3/7/9/11" WATER OAK(D)3/7/9/11" WATER OAK(D) 25" WATER OAK(D) 24" WATER OAK(D) 25" WATER OAK(D)3/7/7/12" MAPLE(D) COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (E) ROADS AND CIRCULATION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD LAYOUT EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT E8/19/2026 SOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'SWOODS PKWYPROPOSED ROADS NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH LEGENDPROPERTY LINEPUD BOUNDARY PROPOSED VEHICLE CONNECTION 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 WETLANDS A'AB'BC'CB'B ROAD SECTIONSEE EXHIBITS I-L ROAD A ROAD B ROAD C1" = 500' BRIGHT OAKPRESCHOOLACADEMY 60" LIVE OAK(B) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 18/23" LIVE OAK(C) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 14/16" WATER OAK(NON GRADED) 10/16" MAPLE(D) MAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (F) DRAINAGE EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteDRAINAGE EXHIBITJOB NUMBER:SCALE:DATE:SHEET:1" = 150'EXHIBIT F8/19/2026 SOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'SWOODS PKWY NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH LEGENDPROPERTY LINEPUD BOUNDARY INFILTRATIONBASINSTORM 0182781001080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 COOPER LAW FIRMWETLANDSTRIBUTARYSWALE BRIGHT OAKPRESCHOOLACADEMY 60" LIVE OAK(B) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 18/23" LIVE OAK(C) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 14/16" WATER OAK(NON GRADED) 10/16" MAPLE(D)INFILTRATIONBASIN 3 INFILTRATIONBASIN 1 INFILTRATIONBASIN 4 SEA ISLAND HABITATFOR HUMANITYRESTORE SEA ISLAND HABITATFOR HUMANITYRESTORE PARKING LOT PRESERVEDWETLAND PRESERVEDWETLANDPOCKETPARK PARK POCKETPARK POCKETPARK EXISTINGPONDEXISTINGDRY PONDINFILTRATIONBASIN 5 INFILTRATIONBASIN 2 COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (D) OPEN SPACE AND BUFFERS EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteOPEN SPACE AND BUFFERSEXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT D8/19/2026 USEABLE OPEN SPACEREQUIRED: 0.78PROVIDED: 2.14 ACPASSIVE OPEN SPACEPROVIDED: 1.47 AC NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH LEGENDPROPERTY LINEPUD BOUNDARY CONSTRUCTED WATER FEATURE /PRESERVED WETLANDSOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'SWOODS PKWY 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 WETLANDSMAYBANK HIGHWAY BUFFER*FERN HILL DRIVE BUFFER*TRIBUTARY MAYBANK HIGHWAY BUFFER FERN HILL DRIVE BUFFER *NOTE: EXISTING TREES IN THE BUFFER ZONESHALL BE PRESEVERED IF NOT IN CONFLICTWITH AN APPROVED IMPROVEMENT TRAIL HOA/POA MAINTAINED AREAS NOTCONSIDERED TO BE OPEN SPACE PEDESTRIAN TRAILCONNECTION POINTSTOTAL OPEN SPACEREQUIRED: 3.12 ACPROVIDED: 3.61 AC (2.14 AC USABLE OPEN SPACE +1.47 AC PASSIVE OPEN SPACE) SS SS SS SS SS SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSS 8W 8W8W SS SSSSSSSSSSSSSS 8W 8W 8W SS SSSS SS SSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSS 8W 60" LIVE OAK(B) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 18/23" LIVE OAK(C) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 14/16" WATER OAK(NON GRADED) 10/16" MAPLE(D) COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (G) UTILITIES EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteUTILITIES EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT G8/19/2026 SOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAYST JOHN'SWOODS PKWYLEGENDPROPERTY LINEPUD BOUNDARYSEWERWATERWWWWW NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 WETLANDS BRIGHT OAKPRESCHOOLACADEMY 60" LIVE OAK(B) 42" WATER OAK(D) 4/13/13" MAPLE(D) 2/5/8/10/10" MAPLE(D) 18/23" LIVE OAK(C) 3/5/18" WATER OAK(D) 31" WATER OAK(C) 42" LIVE OAK(C) 14/16" WATER OAK(NON GRADED) 10/16" MAPLE(D) COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (H) SIGNAGE EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteSIGNAGE EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT H8/19/2026 LEGEND NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 ST JOHN'SWOODS PKWYSOUTHWICK DRIVE FERN HILL DRIVE MAYBANK HIGHWAY RESIDENTIALCOMMUNITY SIGNWETLANDS PROPERTY LINEPUD BOUNDARYNEIGHBORHOODIDENTIFICATION SIGN 5' VEGETATIVE STRIP BOTH SIDES1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS PROPOSED STREET TREES1.5'12' 5' VEGETATIVE STRIP1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES12' TRAVEL LANE 11'12'1.5'5'5'2'2' 12' TRAVEL LANE11' TURN LANE ℄57' A A'5' COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (I) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE AJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT I8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS. 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 2.5'5'5'11'11'1.5'5'5'2.5'1.5'℄ 5' VEGETATIVE STRIP BOTH SIDES1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS PROPOSED STREET LIGHTSPROPOSED STREET TREES B B' COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (J) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE BJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT J8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS. 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 0.5'50' R/W℄ 7' ON-STREET PARKING5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS PROPOSED STREET TREES 5' VEGETATIVE STRIPB B' 2.5'50' R/W5'5'11'11'7'5'0.5'1.5'℄ 5' VEGETATIVE STRIP1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS PROPOSED STREET LIGHTSPROPOSED STREET TREES B B'0.5'5'1.5'7'11'11'1.5'5'5'2.5' 1.5' 1.5' ROLL CURB BOTH SIDES7' ON-STREET PARKING COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (K) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE B - ON-STREET PARKINGON ONE SIDEJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT K8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS. 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 5' SIDEWALKPROPERTY LINE1.5' ROLL CURB BOTH SIDES10' TRAVEL LANES BOTH WAYS ℄C C'4' UTILITY CORRIDOR7' ON-STREET PARKING ON ONE SIDE COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (L) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE CJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT L8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS. 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 25'EVENTS ANDSTORM WATER25'TRAIL ANDSTREETLIGHTING 25'TREESCAPEAND REQUIREDPLANTINGSMAYBANKHIGHWAY COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (M) PUD SECTIONS Aug 19, 2026 9:04am by: Crystal.AponteMAYBANK HIGHWAY BUFFEREXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 10'EXHIBIT M8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 PLANTINGREQUIREMENTSMINIMUM BUFFER DEPTH: 75 FEET100% NATIVE PLANTINGS TO BE USEDMINIMUM BUFFER LANDSCAPING - PLANTS PER 100 LINEAR FEETCANOPY TREES: 9UNDERSTORY TREES: 12(50 PERCENT EVERGREEN)SHRUBS: 60STREET TREES: 2(MAY BE COUNTED TOWARD CANOPY TREE REQUIREMENT)SIDEWALK: 5' MINIMUMSTREET LIGHTING PER CITY OF CHARLESTON PARK DEPARTMENT RECOMMENDATIONS COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (N) PUD SECTIONS Aug 19, 2026 9:04am by: Crystal.AponteFERN HILL DRIVE BUFFEREXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 10'EXHIBIT N8/19/2026 NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH 1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 PLANTINGREQUIREMENTSMINIMUM BUFFER DEPTH: 10 FEET100% NATIVE PLANTINGS TO BE USEDMINIMUM BUFFER LANDSCAPING - PLANTS PER 100 LINEAR FEETCANOPY TREES: 3UNDERSTORY TREES: 3(50 PERCENT EVERGREEN)SHRUBS: 20AN 8' HIGH OPAQUE WALL OR FENCE SHALL BE REQUIRED WITHINOR ADJACENT TO THE LAND USE BUFFER Daniel O. Duggan, MBA Senior Account Manager 2390 W. Aviation Ave Charleston, SC 29406 Mail Code CH 61 Phone: (843) 834-1016 Daniel.Duggan@DominionEnergy.com May 8, 2026 Re: 1730 Fernhill Dr, Johns Island, SC, 29455 Quinn Daniels, EIT | Civil Analyst Kimley-Horn | 1080 Morrison Drive, Suite 240, Charleston, SC, 29403 Quinn: Thank you for your inquiry about natural gas service for the above address. As of the date of this letter, natural gas, due to future unknown considerations such as available gas supply, available capital investment, requested equipment loads and pressures, and other business and operational factors, service cannot be confirmed at this time. Once we have all the below information, an engineering study will be performed to determine our ability to serve th e project and analyze if there will be a cost to you associated with serving the project based on the information and gas load you provided. Please provide the below information: 1) Detailed utility site plan (in AutoCAD) showing water, sewer, and storm drainage. The finalized/approved plan must include lot numbers, street names, and 911 addresses for each lot/building. 2) Additional drawings that indicate wetlands boundaries; utility rights-of-way inside the project; rights-of- way given by adjacent landowners; restricted areas; tree survey with barricade plan; buffer zones (if required); as well as any existing or additional easements. 3) Copies of applicable SCDHEC, USACE, USFWS, MS4, SCDOT, county/municipal, and all other permits and delineations potentially affecting gas line installations. 4) A list of all natural gas appliances and equipment to be installed. For Commercial projects, we will also need the BTUH load for each appliance/piece of equipment. 5) A signed copy of this letter acknowledging its receipt and responsibility for its contents and authorization to begin engineering work. Any Contribution in Aid of Construction (CIAC) associated with providing service will be determined when a finalized/approved plan is submitted to our office. Full payment of the Contribution in Aid of Construction (CIAC) must be received before engineering or permitting of the gas line will begin. 6) Requested date of active service. 7) Other information needed: (if left blank no other information is required at this time) For more information or questions, contact me by phone at (843-834-1016) or at Daniel.Duggn@DominionEnergy.com. Sincerely, Daniel O. Duggan Senior Account Manager June 24, 2025 Attn: Emma Mujezin Landscape Architect Intern Kimley-Horn - 1080 Morrison Dr, Suite 240, Charleston, SC 29403 RE: Charleston County TMS # 279-00-00-025, 010, 288, 008, 009, 017. TMS #313- 00-00-047 and 313-00-00-237. Letter of Coordination for proposed project along Maybank Hwy, Johns Island. Emma, This letter is in response to your request for information on the availability of service at the above list project, locations or development by AT&T. This letter acknowledges the above referenced list project, locations or development is in an area served by AT&T. Any service arrangements for the list project, locations, or development will be subject to later discussions and agreements between the developer and AT&T. Please be advised that this letter is not a commitment by AT&T to provide service to project, locations or development. Please contact me at the phone number included in this letter with any questions. Thank you for contacting AT&T. Allen Stanfield Sr Specialist-OSP Design Engineer SE, AT&T Network Operations 2600 Meeting Street Rd. Charleston, SC 29405 Ofc (843) 740-1836 Cell (843) 801-8006 AS1555@ATT.com PO Box B Charleston, SC 29402 103 St. Philip Street (29403) (843) 727-6800 www.charlestonwater.com Board of Commissioners Thomas B. Pritchard, Chairman Kathleen G. Wilson, Vice Chairman William E. Koopman, Jr., Commissioner Mayor William Cogswell, Ex-Officio City Councilmember Perry K. Waring, Ex-Officio Officers Mark Cline, P.E., Chief Executive Officer Wesley Ropp, CMA, Chief Financial Officer Russell Huggins, P.E., Capital Projects Officer Paul Hanson, Chief Information Officer Baker Mordecai, P.E., Chief Operating Officer Evelyn Ferguson, Chief Administrative Officer Supporting public health and protecting the environment. April 7, 2025 Andrew Allen Kimley-Horn Andrew.allen@kimley-horn.com Sewer Availability TMS 313-00-00-047, 237, 279-00-00-017, 008, 009, 288 Single Family Residential Development This letter is to certify Charleston Water Systems willingness and ability to serve the proposed development in Charleston County with sewer collection service. CWS currently has an existing 12” sewer main in the ROW of Maybank Hwy as well as a 15” gravity sewer main in the ROW of Southwick Drive which can be extended to serve the development. Please contact the St Johns Water Company for information regarding water availability. It will be a developer responsibility to ensure there are adequate capacities in the existing mains to serve this site with wastewater collection and not negatively impact the existing development. Please be advised any extensions or modifications to the infrastructure will be a developer’s expense. All fees and cost associated with providing service to this site will be a developer expense and will be due prior to connection of any Charleston Water System’s sewer system. This letter does not reserve capacity in the Charleston Water System infrastructure, and it is incumbent upon the developer or his agent to confirm the availability herein granted past 12 months of this correspondence. The Charleston Water System certifies the availability of service only insofar as its rights allow. Should access to our existing main/mains be denied by appropriate governing authorities, the Charleston Water System will have no other option than to deny service. This letter is not to be construed as a letter of acceptance for operation and maintenance from the Department of Environmental Services. If there are any questions pertaining to this letter, please do not hesitate to call on me at (843) 727-6869. Sincerely, Lydia Owens Charleston Water System Charleston )excellence is our standard STUDENTS ARE THE HEART -�-CountySCHOOL DISTRICT OFOURWORK! Operations Division Anita W. Huggins Acting Superintendent of Schools Jeffrey Borowy, P.IE. Chief Operating Officer June 26, 2025 Kimley Horn Attn: Andrew Todd-Burke 1080 Morrison Drive, Suite 240 North Charleston, SC 29405 Subject: Maybank PUD - 8 parcels between Fernhill Drive, Southwick Drive, and Maybank Highway Dear Mr. Todd-Burke: Please accept this letter as "Proof of Coordination" and adequate service capacity for the proposed project located in the vicinity listed above in Johns Island. The planned design will consist of thirty-two single family attached and thirty-five single family detached units. To determine an estimate of student yield that any development may create, a statistical formula is applied at the elementary, middle, and high school levels based on the type and number of units to be built. On the basis of the information supplied to us, the four main schools that fall within the attendance zone where the development will take place are listed below and are subject to zoning modification. • Angel Oak ES (4K-1) • Johns Island ES (2-5) • Haut Gap MS (6-8) • St Johns HS (9-12) From a capacity standpoint, we anticipate no impact to the schools listed above for the upcoming (2025-2026) school year. Due to the number of projects currently underway and those that are scheduled to be completed in phases, we strongly urge that all Proof of Coordination letters be reviewed and updated annually. Please contact me at (843) 566-1995 if you have any questions and/or concerns. Sincerely, (H�� Heather Studer Interim Director of Planning & Real Estate 3999 Bridge View Drive • N. Charleston, SC 29405 • tel. (843) 566-1975 • www.ccsc!scl1ools.com July 10, 2025 Kimley-Horn C/o: Emma Mujezin 1080 Morrison Drive, Suite 240 Charleston, SC 29403 Re: Power Availability for Proposed 32-Unit Townhomes and 35 Single Family Residential Units Located off Maybank Highway Charleston County, SC TMS 279-00-008, 009, 010, 017, 025, 288 TMS 313-00-00-047 TMS 313-00-00-237 Dear Emma: Berkeley Electric Cooperative will supply the electrical distribution requirements for the above referenced location. We look forward to extending our facilities to meet the needs of this property. All services that are rendered will be under our service rules and regulations at the time of service. If you have any questions, please don’t hesitate to give me a call. Sincerely, Kevin Mims Manager of Distribution Design and Easements KM/ts Cc: Thomas Barnette, Director of Engineering Services Scott Bennett, Johns Island District Operations Manager Emma Mujezin, Kimley-Horn (emailed copy) File Post Office Box 1234 Moncks Corner, SC 29461 (843) 761-8200 Fax (843) 571-1280 Post Office Box 128 Johns Island, SC 29457 (843) 559-2458 Fax (843) 559-3876 Post Office Box 1549 Goose Creek, SC 29445 (843) 553-5020 Fax (843) 553-6761 Post Office Box 340 Awendaw, SC 29429 (843) 884-7525 Fax (843) 881-8588 ST. JOHN’S WATER COMPANY, INC. “This institution is an equal opportunity employer and provider” Post Office Box 629 John’s Island, South Carolina 29457-0629 Phone (843) 559-0186 Fax (843) 559-0371 Original: September 10, 2024 Updated: April 7, 2025 Andrew Allen Kimley Horn 1080 Morrison Drive, Suite 240 Charleston, SC 29403 Re: Fern Hill Development at TMS numbers 313-00-00-047 & 237 and 279-00-00-017 & 009 & 008 & 288 Water Availability and Willingness to Serve Dear Andrew Allen: This letter is to confirm that the Fern Hill Development proposing the construction of 69 new residential units (34 townhomes and 35 detached units) at TMS numbers 313-00-00-047 & 237 and 279-00-00-017 & 009 & 008 & 288 on Johns Island is within the water service area of the St. John’s Water Company, Inc. (SJWC). SJWC does have wa ter available from an existing 16-inch water line on Maybank Highway located approximately 700 feet from Fern Hill Drive. The smaller 6 -inch water line on Maybank Highway adjacent to Fern Hill Drive will not have enough capacity to serv e the development. H owever, th e 16-inch water main on Maybank Highway approximately 700 feet from Fern Hill Drive will be able to provide capacity. Our system is SC DHEC approved and we have the capacity and willingness to provide potable water service to Fern Hill Development at TMS numbers 313-00-00- 047 & 237 and 279-00-00- 017 & 009 & 008 & 288 for the development of approximately 69 residential units. If you have any questions, please feel free to give me a call at 843-514-5570. Sincerely, Colleen Schild Assistant Manager/Engineer Board Members Thomas Legare, Jr., Chair Cindy Floyd, Vice Chair Glenda Miller, Sec/Treas H. Bernard Freeman Isaac Robinson Becky J. Dennis Mellen Moore Tommy West Richard Thomas April 2026 © Kimley-Horn and Associates, Inc. DRB Maybank Residential Development Traffic Impact Study Charleston, South Carolina Prepared for DRB Group Prepared by DRAFT April 2026 © Kimley-Horn and Associates, Inc. 1080 Morrison Dr, Suite 240 Charleston, South Carolina, 29403 DRB Maybank Residential Development Traffic Impact Study Charleston, South Carolina Prepared for DRB Group Prepared by This document has been digitally signed and sealed by Richard M. Reiff, South Carolina Professional Engineer Number 27504, on February 20, 2025. This electronic document is 110 pages in length. The digital signature certificate must be verified on any electronic copies of this document. Printed copies of this document are not considered signed and sealed. DRAFT DRB Maybank Residential Development Traffic Impact Study Page i April 2026 Table of Contents Executive Summary .................................................................................................................iii 1 Introduction ...........................................................................................................................1 1.1 Existing Conditions...................................................................................................................... 1 2 Project Traffic .......................................................................................................................4 2.1 Trip Generation ........................................................................................................................... 4 2.2 Trip Distribution & Assignment .................................................................................................... 4 3 Traffic Volume Development................................................................................................6 3.1 Existing Traffic Volumes .............................................................................................................. 6 3.2 No-Build Traffic Volume Development ......................................................................................... 6 3.3 Build Traffic Volume Development............................................................................................... 6 4 Traffic Signal Warrant Analysis .........................................................................................10 5 Capacity Analysis ...............................................................................................................12 5.1 Maybank Highway & Southwick Drive........................................................................................ 13 5.2 Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 ........................................ 14 5.3 Maybank Highway & Fern Hill Drive .......................................................................................... 15 5.4 Fern Hill Drive & Cross Island Extension ................................................................................... 15 5.5 Cross Island Extension & Project Driveway #1 .......................................................................... 16 5.6 Cross Island Extension & Southwick Drive ................................................................................ 16 6 Conclusion ..........................................................................................................................17 DRAFT DRB Maybank Residential Development Traffic Impact Study Page ii April 2026 List of Figures Figure ES-1 – Recommended Geometry and Traffic Control ..................................................... iv Figure 1 – Project Location Map .................................................................................................2 Figure 2 – Conceptual Site Plan ..................................................................................................3 Figure 3 – Project Trip Distribution and Assignment ....................................................................5 Figure 4 – 2025 Existing Peak Hour Traffic Volumes ..................................................................7 Figure 5 – 2028 No-Build Peak Hour Traffic Volumes .................................................................8 Figure 6 – 2028 Build Peak Hour Traffic Volumes .......................................................................9 Figure 7 – Recommended Geometry and Traffic Control ..........................................................18 List of Tables Table 1 - Trip Generation Summary ............................................................................................4 Table 2 – Traffic Signal Warrant Analysis Results Summary .....................................................11 Table 3 – HCM7 Level of Service Criteria .................................................................................12 Table 4 – Maybank Highway & Southwick Drive/Plaza Entrance Capacity Analysis Results .....13 Table 5 – Maybank Highway & St. John’s Woods/Project Driveway #1 Parkway ......................14 Table 6 – Maybank Highway & Fern Hill Drive Capacity Analysis Results .................................15 Table 7 – Fern Hill Drive & Cross Island Extension Capacity Analysis Results..........................15 Table 8 – Cross Island Extension & Project Driveway #1 Capacity Analysis Results.................16 Table 9 – Southwick Drive at Cross Island Extension Analysis Results .....................................16 List of Appendices A – Turning Movement Count Data B – Historic Growth Rate Data C – Volume Development Worksheets D – Traffic Signal Warrant Analysis Worksheets E – Capacity Analysis Worksheets DRAFT DRB Maybank Residential Development Traffic Impact Study Page iii April 2026 Executive Summary The purpose of this Traffic Impact Study (TIS) is to review the vehicular traffic impacts of the proposed DRB Maybank Residential Development in the City of Charleston, South Carolina. The proposed development is located on the north side of Maybank Highway between Southwick Drive and Fernhill Drive. The development is expected to consist of up to 38 single-family detached and 38 single-family attached dwelling units. The development will access the roadway network via one full-access driveway along Maybank Road that aligns with St. Johns Woods Parkway and a new roadway connecting Southwick Drive and Fern Hill Drive referred to as Cross Island Extension in this study. This TIS evaluates traffic operations under 2025 Existing and 2028 horizon conditions in accordance with SCDOT guidelines. The following improvements are recommended based on the results of the traffic analysis. Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 · Signalize the intersection. · Construct Project Driveway #1 with a shared through/left-turn lane and a dedicated right- turn lane with 200 feet of full-width storage and 145 feet of taper. · Re-mark the Maybank Highway two-way left-turn to consist of dedicated eastbound left- turn lane with 150 feet of full-width storage and 180 feet of taper. Cross Island Extension & Southwick Drive · Southwick Drive to operate with stop-sign control. Cross Island Extension & Project Driveway #1 · Project Driveway #1 to operate with stop-sign control. Fern Hill Drive & Cross Island Extension · Cross Island Extension to operate with stop-sign control. Recommended roadway geometry and intersection control improvements are illustrated inFigure ES-1. DRAFT 6 'Int 6'! 5 'Int 5'! 4 'Int 4'! 1 'Int 2'! 3 'Int 3'! DRB Maybank Residential Development TIS Figure ES-1 - Recommended Geometry and Traffic Control Maybank Highway St. Johns Woods Parkway Fern Hill Drive Southwick Drive Plaza Entrance Cross Island Extension Cross Island Extension Project Driveway #1 Project Site Project Site S = 250' TWLTL TWLTL S = 200' Legend Existing Laneage Recommended Laneage S = XX' Storage Length TWLTL Two-Way Left-Turn Lane Existing Signal Existing Stop Control Recommended Stop Control S = 150' DRAFT DRB Maybank Residential Development Traffic Impact Study Page 1 April 2026 1 Introduction The purpose of this TIS is to review the vehicular traffic impacts of the proposed DRB Maybank Residential Development in the City of Charleston, SC. The proposed development is located on the north side of Maybank Highway between Southwick Drive and Fernhill Drive. The development is expected to consist of up to 38 single-family detached and 38 single-family attached dwelling units. The development will access the roadway network via one full-access driveway along Maybank Road that aligns with St. Johns Woods Parkway and a new roadway connecting Southwick Drive and Fern Hill Drive referred to as Cross Island Extension in this study. This TIS evaluates traffic operations under 2025 Existing and 2028 horizon conditions in accordance with SCDOT guidelines. The study area consists of the following intersections. 1. Maybank Highway & Southwick Drive/Plaza Entrance 2. Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 3. Maybank Highway & Fern Hill Drive 4. Fern Hill Drive & Cross Island Extension 5. Cross Island Extension & Project Driveway #1 6. Cross Island Extension & Southwick Drive The location of the proposed development is illustrated inFigure 1. A conceptual site plan for the development is provided in Figure 2. 1.1 Existing Conditions Maybank Highway is a two-lane, undivided, urban minor arterial roadway with a posted speed limit of 45 miles per hour. Based upon SCDOT data, 19,200 vehicles per day (vpd) traveled along Maybank Highway in 2024. Southwick Drive is a two-lane, undivided, urban local road with a posted speed limit of 35 mph. Based upon the traffic count data collected for this study, approximately 2,460 vpd traveled along Southwick Drive. Fern Hill Drive is a two-lane, undivided, urban local road with a posted speed limit of 25 mph. Based upon SCDOT data, 650 vpd traveled along Fern Hill Drive in 2024. DRAFT DRB Maybank Residential Development TIS Figure 1 - Site Location Map 1 3 6 5 2 4 DRAFT DRB Maybank Residential Development TIS Figure 2 - Conceptual Site Plan DRAFT DRB Maybank Residential Development Traffic Impact Study Page 4 April 2026 2 Project Traffic 2.1 Trip Generation The trip generation rates and equations published in the Institute of Transportation Engineers (ITE) Trip Generation Manual, 11th Edition were used to estimate the trip generation potential of the development. The analysis was performed using the information provided for land use code (LUC) 210 – Single Family Detached Housing and LUC 215 – Single-Family Attached Housing. Internal capture and pass-by trip reductions were not considered in the trip generation analysis due to the nature of residential development. The estimated trip generation potential of the DRB Maybank Residential Development is summarized in Table 1, which indicates that the development is anticipated to generate 45 trips during the AM peak hour and 59 trips during the PM peak hour. Table 1 - Trip Generation Summary Land Use Intensity Units Daily AM Peak Hour PM Peak Hour Total In Out Total In Out 210 - Single-Family Detached Housing 38 DU 414 31 8 23 40 25 15 215 - Single-Family Attached Housing 38 DU 239 14 4 10 19 11 8 Total Net New External Trips 653 45 12 33 59 36 23 Daily Traffic Generation 210 - Single-Family Detached Housing ITE 210 = LN (T) = 0.92 * LN (X) + (2.68); (50 % In; 50 % Out) 215 - Single-Family Attached Housing ITE 215 = T = 7.62 * (X) + (-50.48); (50 % In; 50 % Out) AM Peak-Hour Traffic Generation 210 - Single-Family Detached Housing ITE 210 = LN (T) = 0.91 * LN (X) + (0.12); (26 % In; 74 % Out) 215 - Single-Family Attached Housing ITE 215 = T = 0.52 * (X) + (-5.7); (31 % In; 69 % Out) PM Peak-Hour Traffic Generation 210 - Single-Family Detached Housing ITE 210 = LN (T) = 0.94 * LN (X) + (0.27); (63 % In; 37 % Out) 215 - Single-Family Attached Housing ITE 215 = T = 0.6 * (X) + (-3.93); (57 % In; 43 % Out) 2.2 Trip Distribution & Assignment New external trips generated by the proposed development were distributed and assigned to the surrounding roadway network based on existing travel patterns, surrounding land uses, and the proposed site layout. The trip distribution percentages used in this analysis are as follows. · 25% to/from the north via Southwick Drive · 50% to/from the east via Maybank Highway · 25% to/from the west via Maybank Highway The project trips were then assigned to the existing roadway network. The assumed distribution and assignment of new project trips are illustrated in Figure 3. DRAFT 6 'Int 6'! 5 'Int 5'! 4 'Int 4'! 1 2 'Int 2'! 3 'Int 3'! (9) 3 4 (9) 13 (7) 2 (7)(6) 9 (6) (9) 2 (5) 7 10 (7) 7 (5) (2) 1 2 2 (3) (9) (3) (2) 5 (7) 4 3 3 (3) 3 4 (11) (1) (5) (11) (9) 3 13 3 8 DRB Maybank Residential Development TIS Figure 3 - Project Trip Distribution and Assignment Legend xx AM Peak Hour Project Site Trips (xx) PM Peak Hour Project Site Trips St. Johns Woods Parkway Southwick Drive 25% 25% 50% Maybank Highway Plaza Entrance Cross Island Extension Cross Island Extension Project Driveway #1 Fern Hill Drive Project Site Project Site DRAFT DRB Maybank Residential Development Traffic Impact Study Page 6 April 2026 3 Traffic Volume Development Existing 2025 traffic volumes were utilized in the analysis and future-year traffic volumes were developed for projected 2028 traffic conditions. The future-year volumes consisted of the existing traffic volumes adjusted by an annual growth rate, the projected traffic volumes of approved nearby developments, and the projected traffic volumes generated by the DRB Maybank Residential Development. 3.1 Existing Traffic Volumes Intersection turning movement counts were conducted at the Maybank Highway intersections with Southwick Drive and Fern Hill Drive during the AM peak period (7:00 AM to 9:00 AM) and PM peak period (4:00 PM to 6:00 PM) on Wednesday, March 12, 2025.Intersection turning movement counts were conducted at the intersection of Maybank Highway & St. Johns Woods Parkway during the AM peak period (7:00 AM to 9:00 AM) and PM peak period (4:00 PM to 6:00 PM) on Wednesday, October 22, 2025. Figure 4 illustrates the 2025 Existing Peak-Hour traffic volumes. The raw turning-movement count data is included in Appendix A. 3.2 No-Build Traffic Volume Development Based upon the data from SCDOT count station 10-0267, Maybank Highway has experienced approximately 2.7% annual growth in traffic over the past four years. Therefore, a 3.0% annual growth rate was used to develop the background traffic for 2028 No-Build conditions. The growth rate calculations are included in Appendix B. In addition to the growth-rate adjusted traffic volumes, the approved development trips from the Southwick Drive Residential Development TIA were also considered to develop the 2028 No- Build peak-hour traffic volumes which are illustrated in Figure 5. 3.3 Build Traffic Volume Development The DRB Maybank Residential Development project traffic volumes were added to the No-Build traffic volumes to develop the Build traffic volumes for the future-year time period. With the new roadway connections proposed as part of the DRB Maybank Residential Development, it was assumed that 90% of the No-Build traffic volumes using Southwick Drive to access Maybank Highway will use the new Cross Island Extension and Project Driveway #1 to access Maybank Highway under Build conditions. The 2028 Build peak-hour traffic volumes are illustrated inFigure 6. Worksheets documenting traffic volume development are provided in Appendix C. DRAFT 1 'Int 2'! 3 'Int 3'! 6 4 (127) 22 (629) 348 (22) 13 99 14 102 87 (57) (9) (51) 32 (60) (3) (1) 3 1 (2) 1 (733) 500 (4) 761 (916) 1 22 (188) 653 (675) 14 (17) 732 19 (859) (684) 451 (51) (21) 5018 (11) (1) (22) (18) Legend xx AM Peak Hour Traffic Volumes (xx) PM Peak Hour Traffic Volumes St. Johns Woods Parkway Maybank Highway Fern Hill Drive Southwick Drive Plaza Entrance DRB Maybank Residential Development TIS Figure 4 - 2025 Existing Peak-Hour Traffic Volumes DRAFT 1 2 'Int 2'! 3 'Int 3'! (972) (66) 814 3515 (19)(12) (1) (24) (155) 31 (687) 380 7 4 21 (24) 14 (73) (10) (78) 125 15 145 109 (238) 714 (738) 3 1 (2) 35 (3) 846 (1,034) 1 (4) (1) 527 20 24 (823) 546 (23) (769) (20) 55(56) Legend xx AM Peak Hour Traffic Volumes (xx) PM Peak Hour Traffic Volumes St. Johns Woods Parkway Maybank Highway Fern Hill Drive Southwick Drive Plaza Entrance DRB Maybank Residential Development TIS Figure 5 - 2028 No-Build Peak-Hour Traffic Volumes DRAFT 6 'Int 6'! 5 'Int 5'! 4 'Int 4'! 1 'Int 2'! 3 'Int 3'! 117 (317) 0 (0) (157) 266 (13) 22 15 0 (12) (1) (24) (34) (0) 29 (6) (1) (6) 10 1 11 9 (28) (14) 2 (837) 412 7 4 21 (24) 14 (19) 837 (811) (0) (81) 0 147 (4)4 24 (20) 20 (23) (0) (56) 103 (226) 717 (756) 32 461 0 55 (150) (697) (3)4 5 848 (2) 35 (832) 559 (6)7 (15) (1,041) (79)134 35 (66) 10 4 2 (11) (7) (0) 0 (5) 7 7 (5) (0)0 (7) 2 (150) 264 110 2 (312) (5) (7) DRB Maybank Residential Development TIS Figure 6 - 2028 Build Peak-Hour Traffic Volumes Maybank Highway Legend xx AM Peak Hour Traffic Volumes (xx) PM Peak Hour Traffic Volumes St. Johns Woods Parkway Fern Hill Drive Southwick Drive Plaza Entrance Cross Island Extension Cross Island Extension Project Driveway #1 Project Site Project Site DRAFT DRB Maybank Residential Development Traffic Impact Study Page 10 April 2026 4 Traffic Signal Warrant Analysis A traffic signal warrant analysis was conducted for the intersection of Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 in accordance with Part 4 of the Manual on Uniform Traffic Control Devices (MUTCD). The MUTCD provides a total of nine traffic signal warrants ; however, only Warrant 1 (Eight -Hour Vehicular Volume) and Warrant 2 (Four -Hour Vehicular Volume) were considered in this analysis. For the purposes of this analysis, the following assumption was considered: ⚫ The posted speed limit on Maybank Highway exceeds 40 mph; therefore, the 70% reduction factors offered by the MUTCD were considered as part of the analysis. ⚫ The minor street right -turning movements were excluded to provide a conservative analysis. ⚫ The traffic volumes considered for the signal warrant analysis include the existing traffic volumes, project trips from the subject development, project trips from the Southwick Drive TIA, and expected traffic diversion due to the new proposed roadway connections included from the subject development. Projected background growth was excluded in the analysis. Warrant 1 – Eight-Hour Vehicular Volume Warrant 1 is described by the MUTCD as follows: “The Minimum Vehicular Volume, Condition A, is intended for application at locations where a large volume of intersecting traffic is the principal reason to consider installing a traffic control signal.” “The Interruption of Continuous Traffic, Condition B, is intended for application at locations where Condition A is not satisfied and where the traffic volume on a major street is so heavy that traffic on a minor intersecting street suffers excessive delay or conflict in entering or crossing the major street.” “It is intended that Warrant 1 be treated as a single warrant. If Condition A is satisfied, then Warrant 1 is satisfied and analyses of Condition B and the combination of Conditions A and B are not needed. Similarly, if Condition B is satisfied, then Warran t 1 is satisfied and an analysis of the combination of Conditions A and B is not needed.” The minimum hourly volumes needed to satisfy the criteria of Warrant 1, Condition A are 350 vehicles per hour (vph) on the major street approaches and 140 vph on the highest minor street approach (for a two -lane approach) for each of any eight hours on an average day. For th is analysis, the traffic volumes meet the criteria for Warrant 1, Condition A for three o f the eight required hours, therefore Warrant 1, Condition A is not satisfied. The minimum hourly volumes needed to satisfy the criteria of Warrant 1, Condition B are 525 vph on the major street approaches and 70 vph on the highest minor street approach (for a two-lane approach) for each of any eight hours on an average day. For this analysis, the traffic volumes meet the criteria for Warrant 1, Condition B for 13 of the eight required hours, therefore Warrant 1, Condition B is satisfied, meaning Warrant 1 is satisfied. DRAFT DRB Maybank Residential Development Traffic Impact Study Page 11 April 2026 Warrant 2 – Four-Hour Vehicular Volume Warrant 2 is described by the MUTCD as follows: “The Four-Hour Vehicular Volume signal warrant conditions are intended to be applied where the volume of intersecting traffic is the principal reason to consider installing a traffic control signal.” The criteria of Warrant 2 are satisfied if the major and minor street volumes plot above the applicable curve in Figure 4C -2 within Part 4 of the MUTCD for each of any four hours of an average day. For this analysis, the traffic volumes meet the criteria for Warrant 2 for 13 of the eight required hours, therefore Warrant 2 is satisfied. Summary The traffic signal warrant analysis results are summarized in Table 2 and indicate that Warrant 1 and Warrant 2 are satisfied. The traffic signal warrant analysis worksheets are included in Appendix D. Table 2 – Traffic Signal Warrant Analysis Results Summary MUTCD Traffic Signal Warrant Warrant Analysis Results Warrant 1, Condition A Not Satisfied (3/8) Warrant 1, Condition B Satisfied (13/8) Warrant 2 Satisfied (13/8) Based upon the results of the traffic signal warrant analysis, it is recommended to signalize the intersection of Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 prior to full buildout of the development. DRAFT DRB Maybank Residential Development Traffic Impact Study Page 12 April 2026 5 Capacity Analysis Capacity analyses were conducted under 2025 Existing conditions, 2028 No-Build conditions, and 2028 Build conditions using theSynchro Version 12 software.Synchro utilizes methodologies contained within the Highway Capacity Manual, 7th Edition (HCM7) to evaluate the level of service (LOS) of an intersection under given geometric, traffic control, and traffic demand scenarios. Auxiliary turn-lane warrant evaluations were conducted in accordance with guidelines identified in the SCDOT Access and Roadside Management Standards manual and SCDOT Roadway Design Manual. Intersection LOS grades range from LOS A to LOS F, which are directly related to the level of control delay at the intersection and characterize the operational conditions of the intersection traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles experience little to no delays, and LOS F operations typically represent poor, gridlocked conditions with high vehicular delays, and are generally considered undesirable.Table 3 lists the LOS control delay thresholds published in HCM7 for signalized and unsignalized intersections. Table 3 – HCM7 Level of Service Criteria LOS Control Delay per Vehicle (sec/veh) Signalized Intersections Unsignalized Intersections A ≤ 10 ≤ 10 B > 10 – 20 > 10 – 15 C > 20 – 35 > 15 – 25 D > 35 – 55 > 25 – 35 E > 55 – 80 > 35 – 50 F > 80 > 50 Existing peak hour factors (PHFs) and heavy vehicle percentages were utilized under 2025 Existing conditions with a minimum heavy vehicle percentage of 2% considered. For future-year conditions, PHFs were limited to a maximum of 0.95. The following sections outline the results of the capacity and turn lane analysis for each of the study intersections. The capacity analysis worksheets are included in Appendix E. DRAFT DRB Maybank Residential Development Traffic Impact Study Page 13 April 2026 5.1 Maybank Highway & Southwick Drive The installation of a traffic signal at the intersection of Maybank Highway & Southwick Drive was recommended by the Southwick Drive Residential Development TIA and was considered to be in place for the No-Build scenario. Based on coordination with the City of Charleston and traffic signal warrant analysis, it is recommended to relocate the traffic signal to the intersection of Maybank Highway & St. John’s Woods Parkway/Project Driveway #1 with the development of the DRB Maybank Residential Development project. The capacity analysis results for the Maybank Highway & Southwick Drive intersection are summarized in Table 4 . The side-street approaches are expected to operate at undesirable conditions during both peak periods under the Build scenario. However, these conditions are common for unsignalized intersections along heavily traveled arterials such as Maybank Highway and are projected to be an improvement over existing conditions. Therefore, no improvements are recommended at this intersection. Table 4 – Maybank Highway & Southwick Drive/Plaza Entrance Capacity Analysis Results Condition Measure Maybank Highway Maybank Highway Plaza Entrance Southwick Drive Intersection EB WB NB SB AM Peak Hour 2025 Existing LOS (Delay) A (9.6)* A (8.1)* C (19.3) F (138.0) - 2028 No-Build LOS (Delay) A (8.9) B (14.6) C (22.8) C (31.8) B (16.3) 2028 Build LOS (Delay) A (9.9)* A (8.4)* C (21.1) D (32.8) - PM Peak Hour 2025 Existing LOS (Delay) B (11.0)* A (9.1)* F (54.2) F (385.4) - 2028 No-Build LOS (Delay) B (10.5) B (11.3) C (34.2) D (43.6) B (13.9) 2028 Build LOS (Delay) A (9.8)* B (10.1)* E (46.5) F (58.6) - *Left-turn delay reported for major street approaches at unsignalized intersections. DRAFT DRB Maybank Residential Development Traffic Impact Study Page 14 April 2026 5.2 Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 As previously noted, it is recommended to signalize the intersection of Maybank Highway & St. John’s Woods Parkway/Project Driveway #1 with the development of the DRB Maybank Residential Development project. The capacity analysis results for the Maybank Highway & St. John’s Woods Parkway/Project Driveway #1 intersection are summarized in Table 5. The intersection is expected to operate at acceptable LOS conditions during both peak periods under the Build scenario. No further improvements are recommended. Table 5 – Maybank Highway & St. John’s Woods/Project Driveway #1 Parkway Capacity Analysis Results Condition Measure Maybank Highway Maybank Highway St. Johns Woods Parkway Project Driveway #1 Intersection EB WB NB SB AM Peak Hour 2025 Existing LOS (Delay) - A (8.5)* B (14.0) - - 2028 No-Build LOS (Delay) - A (8.8)* C (15.4) - - 2028 Build LOS (Delay) A (5.2) A (7.1) C (30.3) D (39.7) B (12.9) PM Peak Hour 2025 Existing LOS (Delay) - A (9.4)* C (17.1) - - 2028 No-Build LOS (Delay) - A (9.9)* C (19.8) - - 2028 Build LOS (Delay) A (7.7) A (8.5) D (38.0) D (39.0) B (11.5) *Left-turn delay reported for major street approaches at unsignalized intersections. DRAFT DRB Maybank Residential Development Traffic Impact Study Page 15 April 2026 5.3 Maybank Highway & Fern Hill Drive The capacity analysis results for the Maybank Highway & Fern Hill Drive intersection are summarized in Table 6 . The side-street approach currently operates at acceptable LOS conditions and is projected to continue to operate at acceptable LOS conditions in future-year scenarios. Therefore, no improvements are recommended. Table 6 – Maybank Highway & Fern Hill Drive Capacity Analysis Results Condition Measure Maybank Highway Fern Hill Drive EB Left SB AM Peak Hour 2025 Existing LOS (Delay) A (9.5) C (18.1) 2028 No-Build LOS (Delay) B (10.1) C (21.8) 2028 Build LOS (Delay) B (10.1) D (25.7) PM Peak Hour 2025 Existing LOS (Delay) B (10.1) C (23.6) 2028 No-Build LOS (Delay) B (10.7) D (29.0) 2028 Build LOS (Delay) B (10.7) D (34.4) 5.4 Fern Hill Drive & Cross Island Extension The capacity analysis results for the Fern Hill Drive & Cross Island Extension intersection are summarized in Table 7, which indicates that the intersection is projected to operate at acceptable conditions. Therefore, no improvements are recommended. Table 7 – Fern Hill Drive & Cross Island Extension Capacity Analysis Results Condition Measure Cross Island Extension Fern Hill Drive EB NB Left AM Peak Hour 2028 Build LOS (Delay) A (8.4) A (7.2) PM Peak Hour 2028 Build LOS (Delay) A (8.4) A (7.2) DRAFT DRB Maybank Residential Development Traffic Impact Study Page 16 April 2026 5.5 Cross Island Extension & Project Driveway #1 The capacity analysis results for the Cross Island Extension & Project Driveway #1 intersection are summarized in Table 8 , which indicates that the intersection is projected to operate at acceptable conditions. Therefore, no improvements are recommended. Table 8 – Cross Island Extension & Project Driveway #1 Capacity Analysis Results Condition Measure Cross Island Extension Project Driveway #1 WB Left NB AM Peak Hour 2028 Build LOS (Delay) A (7.9) B (10.3) PM Peak Hour 2028 Build LOS (Delay) A (7.6) B (11.8) 5.6 Cross Island Extension & Southwick Drive The capacity analysis results for the Southwick Drive & Cross Island Extension intersection are summarized in Table 9, which indicates that the intersection is projected to operate at acceptable conditions. Therefore, no improvements are recommended. Table 9 – Southwick Drive at Cross Island Extension Analysis Results Condition Measure Southwick Drive NB AM Peak Hour 2028 Build LOS (Delay) B (11.4) PM Peak Hour 2028 Build LOS (Delay) B (12.7) DRAFT DRB Maybank Residential Development Traffic Impact Study Page 17 April 2026 6 Conclusion The purpose of this TIS is to review the vehicular traffic impacts of the proposed DRB Maybank Residential Development in the City of Charleston, South Carolina. The proposed development is located on the north side of Maybank Highway between Southwick Drive and Fernhill Drive. The development is expected to consist of up to 38 single-family detached and 38 single-family attached dwelling units. The development will access the roadway network via one full-access driveway along Maybank Road that aligns with St. Johns Woods Parkway and a new roadway connecting Southwick Drive and Fern Hill Drive referred to as Cross Island Extension in this study. This TIS evaluates traffic operations under 2025 Existing and 2028 horizon conditions in accordance with SCDOT guidelines. The following improvements are recommended based on the results of the traffic analysis. Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 · Signalize the intersection. · Construct Project Driveway #1 with a shared through/left-turn lane and a dedicated right- turn lane with 200 feet of full-width storage and 145 feet of taper. · Re-mark the Maybank Highway two-way left-turn to consist of dedicated eastbound left- turn lane with 150 feet of full-width storage and 180 feet of taper. Cross Island Extension & Southwick Drive · Southwick Drive to operate with stop-sign control. Cross Island Extension & Project Driveway #1 · Project Driveway #1 to operate with stop-sign control. Fern Hill Drive & Cross Island Extension · Cross Island Extension to operate with stop-sign control. Recommended roadway geometry and intersection control improvements are illustrated in Figure 7. DRAFT 6 'Int 6'! 5 'Int 5'! 4 'Int 4'! 1 'Int 2'! 3 'Int 3'! DRB Maybank Residential Development TIS Figure 7 - Recommended Geometry and Traffic Control Maybank Highway St. Johns Woods Parkway Fern Hill Drive Southwick Drive Plaza Entrance Cross Island Extension Cross Island Extension Project Driveway #1 Project Site Project Site S = 250' S = 150' DRAFT DRB Maybank Residential Development Traffic Impact Study Appendix A – Turning Movement Counts DRAFT File Name : Maybank Hwy @ Southwick Dr Site Code : Start Date : 03/12/2025 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Southwick Dr Southbound Maybank Hwy Westbound Access Rd Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 22 1 22 0 1 118 10 0 4 3 2 0 9 84 0 0 276 07:15 32 1 23 0 5 139 16 0 3 0 1 1 10 73 1 0 305 07:30 31 2 37 0 4 155 24 0 0 0 3 1 3 59 2 0 321 07:45 36 1 36 0 2 154 20 0 1 3 4 0 4 77 4 0 342 Total 121 5 118 0 12 566 70 0 8 6 10 2 26 293 7 0 1244 08:00 14 6 22 0 5 143 19 0 2 0 4 0 7 80 3 0 305 08:15 18 4 21 0 3 134 27 0 0 1 6 0 4 80 3 0 301 08:30 34 3 20 0 4 165 21 0 3 0 5 0 7 82 3 0 347 08:45 24 3 15 1 11 129 16 0 1 2 5 2 3 112 3 0 327 Total 90 16 78 1 23 571 83 0 6 3 20 2 21 354 12 0 1280 16:00 14 2 15 0 6 195 51 0 0 0 8 0 28 165 4 0 488 16:15 9 2 12 0 3 170 41 0 1 0 7 1 31 165 6 0 448 16:30 10 2 10 0 3 173 42 0 5 1 2 6 33 148 7 0 442 16:45 18 3 20 0 5 137 54 0 5 0 5 4 35 151 5 0 442 Total 51 9 57 0 17 675 188 0 11 1 22 11 127 629 22 0 1820 17:00 20 3 18 0 3 145 46 0 2 1 3 0 35 161 4 0 441 17:15 13 2 12 0 3 182 36 0 2 5 5 1 31 142 7 0 441 17:30 11 1 10 0 8 143 49 0 2 2 7 3 25 124 3 0 388 17:45 13 1 19 0 8 133 44 0 4 5 7 1 16 151 7 0 409 Total 57 7 59 0 22 603 175 0 10 13 22 5 107 578 21 0 1679 Grand Total 319 37 312 1 74 2415 516 0 35 23 74 20 281 1854 62 0 6023 Apprch % 47.7 5.5 46.6 0.1 2.5 80.4 17.2 0 23 15.1 48.7 13.2 12.8 84.4 2.8 0 Total % 5.3 0.6 5.2 0 1.2 40.1 8.6 0 0.6 0.4 1.2 0.3 4.7 30.8 1 0 Passenger Vehicles 319 37 309 1 74 2364 510 0 35 23 74 20 276 1824 62 0 5928 % Passenger Vehicles 100 100 99 100 100 97.9 98.8 0 100 100 100 100 98.2 98.4 100 0 98.4 Heavy Vehicles 0 0 1 0 0 38 3 0 0 0 0 0 4 22 0 0 68 % Heavy Vehicles 0 0 0.3 0 0 1.6 0.6 0 0 0 0 0 1.4 1.2 0 0 1.1 Buses 0 0 2 0 0 13 3 0 0 0 0 0 1 8 0 0 27 % Buses 0 0 0.6 0 0 0.5 0.6 0 0 0 0 0 0.4 0.4 0 0 0.4 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Southwick Dr Site Code : Start Date : 03/12/2025 Page No : 2 Southwick Dr Maybank Hwy Maybank Hwy Access Rd Right 309 1 2 312 Thru 37 0 0 37 Left 319 0 0 319 Peds 1 0 0 1 InOut Total 809 666 1475 7 1 8 4 2 6 820 1489 669 Right 510 3 3 516 Thru 2364 38 13 2415 Left 74 0 0 74 Peds 0 0 0 0 OutTotal In 2217 2948 5165 22 41 63 8 16 24 2247 5252 3005 Left 35 0 0 35 Thru 23 0 0 23 Right 74 0 0 74 Peds 20 0 0 20 Out TotalIn 173 152 325 0 0 0 0 0 0 173 325 152 Left 276 4 1 281 Thru 1824 22 8 1854 Right 62 0 0 62 Peds 0 0 0 0 TotalOut In 2708 2162 4870 39 26 65 15 9 24 2762 4959 2197 03/12/2025 07:00 03/12/2025 17:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Southwick Dr Site Code : Start Date : 03/12/2025 Page No : 3 Southwick Dr Southbound Maybank Hwy Westbound Access Rd Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 07:45 07:45 36 1 36 0 73 2 154 20 0 176 1 3 4 0 8 4 77 4 0 85 342 08:00 14 6 22 0 42 5 143 19 0 167 2 0 4 0 6 7 80 3 0 90 305 08:15 18 4 21 0 43 3 134 27 0 164 0 1 6 0 7 4 80 3 0 87 301 08:30 34 3 20 0 57 4 165 21 0 190 3 0 5 0 8 7 82 3 0 92 347 Total Volume 102 14 99 0 215 14 596 87 0 697 6 4 19 0 29 22 319 13 0 354 1295 % App. Total 47.4 6.5 46 0 2 85.5 12.5 0 20.7 13.8 65.5 0 6.2 90.1 3.7 0 PHF .708 .583 .688 .000 .736 .700 .903 .806 .000 .917 .500 .333 .792 .000 .906 .786 .973 .813 .000 .962 .933 Passenger Vehicles 102 14 98 0 214 14 575 85 0 674 6 4 19 0 29 21 307 13 0 341 1258 % Passenger Vehicles Heavy Vehicles 0 0 1 0 1 0 17 1 0 18 0 0 0 0 0 1 10 0 0 11 30 % Heavy Vehicles 0 0 1.0 0 0.5 0 2.9 1.1 0 2.6 0 0 0 0 0 4.5 3.1 0 0 3.1 2.3 Buses 0 0 0 0 0 0 4 1 0 5 0 0 0 0 0 0 2 0 0 2 7 % Buses 0 0 0 0 0 0 0.7 1.1 0 0.7 0 0 0 0 0 0 0.6 0 0 0.6 0.5 Southwick Dr Maybank Hwy Maybank Hwy Access Rd Right 98 1 0 99 Thru 14 0 0 14 Left 102 0 0 102 Peds 0 0 0 0 InOut Total 110 214 324 2 1 3 1 0 1 113 328 215 Right 85 1 1 87 Thru 575 17 4 596 Left 14 0 0 14 Peds 0 0 0 0 OutTotal In 428 674 1102 10 18 28 2 5 7 440 1137 697 Left 6 0 0 6 Thru 4 0 0 4 Right 19 0 0 19 Peds 0 0 0 0 Out TotalIn 41 29 70 0 0 0 0 0 0 41 70 29 Left 21 1 0 22 Thru 307 10 2 319 Right 13 0 0 13 Peds 0 0 0 0 TotalOut In 679 341 1020 18 11 29 4 2 6 701 1055 354 Peak Hour Begins at 07:45 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Southwick Dr Site Code : Start Date : 03/12/2025 Page No : 4 Southwick Dr Southbound Maybank Hwy Westbound Access Rd Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:00 16:00 14 2 15 0 31 6 195 51 0 252 0 0 8 0 8 28 165 4 0 197 488 16:15 9 2 12 0 23 3 170 41 0 214 1 0 7 1 9 31 165 6 0 202 448 16:30 10 2 10 0 22 3 173 42 0 218 5 1 2 6 14 33 148 7 0 188 442 16:45 18 3 20 0 41 5 137 54 0 196 5 0 5 4 14 35 151 5 0 191 442 Total Volume 51 9 57 0 117 17 675 188 0 880 11 1 22 11 45 127 629 22 0 778 1820 % App. Total 43.6 7.7 48.7 0 1.9 76.7 21.4 0 24.4 2.2 48.9 24.4 16.3 80.8 2.8 0 PHF .708 .750 .713 .000 .713 .708 .865 .870 .000 .873 .550 .250 .688 .458 .804 .907 .953 .786 .000 .963 .932 Passenger Vehicles 51 9 56 0 116 17 665 185 0 867 11 1 22 11 45 124 623 22 0 769 1797 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 3 2 0 5 0 0 0 0 0 3 5 0 0 8 13 % Heavy Vehicles 0 0 0 0 0 0 0.4 1.1 0 0.6 0 0 0 0 0 2.4 0.8 0 0 1.0 0.7 Buses 0 0 1 0 1 0 7 1 0 8 0 0 0 0 0 0 1 0 0 1 10 % Buses 0 0 1.8 0 0.9 0 1.0 0.5 0 0.9 0 0 0 0 0 0 0.2 0 0 0.1 0.5 Southwick Dr Maybank Hwy Maybank Hwy Access Rd Right 56 0 1 57 Thru 9 0 0 9 Left 51 0 0 51 Peds 0 0 0 0 InOut Total 310 116 426 5 0 5 1 1 2 316 433 117 Right 185 2 1 188 Thru 665 3 7 675 Left 17 0 0 17 Peds 0 0 0 0 OutTotal In 696 867 1563 5 5 10 1 8 9 702 1582 880 Left 11 0 0 11 Thru 1 0 0 1 Right 22 0 0 22 Peds 11 0 0 11 Out TotalIn 48 45 93 0 0 0 0 0 0 48 93 45 Left 124 3 0 127 Thru 623 5 1 629 Right 22 0 0 22 Peds 0 0 0 0 TotalOut In 732 769 1501 3 8 11 8 1 9 743 1521 778 Peak Hour Begins at 16:00 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ St Johns Woods Pkwy Site Code : Start Date : 10/22/2025 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Southbound Maybank Hwy Westbound St Johns Woods Pkwy Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 0 0 0 0 3 134 0 0 2 0 18 0 0 116 2 0 275 07:15 0 0 0 0 3 166 0 0 4 0 4 0 0 136 2 0 315 07:30 0 0 0 0 4 179 0 0 1 0 10 0 0 85 1 0 280 07:45 0 0 0 0 4 195 0 0 4 0 10 0 0 103 2 0 318 Total 0 0 0 0 14 674 0 0 11 0 42 0 0 440 7 0 1188 08:00 0 0 0 0 10 167 0 0 9 0 14 0 0 91 2 0 293 08:15 0 0 0 0 8 192 0 0 2 0 8 1 0 107 6 0 324 08:30 0 0 0 0 6 194 0 0 6 0 12 0 0 129 7 0 354 08:45 0 0 0 0 8 179 0 0 5 0 16 0 0 124 3 0 335 Total 0 0 0 0 32 732 0 0 22 0 50 1 0 451 18 0 1306 16:00 0 0 0 0 11 180 0 0 8 0 11 0 0 207 4 0 421 16:15 0 0 0 0 17 172 0 0 3 0 8 0 0 172 9 0 381 16:30 0 0 0 0 19 170 0 0 3 0 27 0 0 157 6 0 382 16:45 0 0 0 0 21 212 0 0 6 0 5 0 0 152 2 0 398 Total 0 0 0 0 68 734 0 0 20 0 51 0 0 688 21 0 1582 17:00 0 0 0 0 13 210 0 0 3 0 11 0 0 166 6 0 409 17:15 0 0 0 0 7 206 0 0 9 0 8 0 0 166 4 0 400 17:30 0 0 0 0 8 179 0 0 1 0 7 0 0 156 6 0 357 17:45 0 0 0 0 14 189 0 0 6 0 3 0 0 147 2 0 361 Total 0 0 0 0 42 784 0 0 19 0 29 0 0 635 18 0 1527 Grand Total 0 0 0 0 156 2924 0 0 72 0 172 1 0 2214 64 0 5603 Apprch % 0 0 0 0 5.1 94.9 0 0 29.4 0 70.2 0.4 0 97.2 2.8 0 Total % 0 0 0 0 2.8 52.2 0 0 1.3 0 3.1 0 0 39.5 1.1 0 Passenger Vehicles 0 0 0 0 156 2855 0 0 71 0 171 1 0 2166 64 0 5484 % Passenger Vehicles 0 0 0 0 100 97.6 0 0 98.6 0 99.4 100 0 97.8 100 0 97.9 Heavy Vehicles 0 0 0 0 0 54 0 0 1 0 0 0 0 40 0 0 95 % Heavy Vehicles 0 0 0 0 0 1.8 0 0 1.4 0 0 0 0 1.8 0 0 1.7 Buses 0 0 0 0 0 15 0 0 0 0 1 0 0 8 0 0 24 % Buses 0 0 0 0 0 0.5 0 0 0 0 0.6 0 0 0.4 0 0 0.4 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ St Johns Woods Pkwy Site Code : Start Date : 10/22/2025 Page No : 2 Maybank Hwy Maybank Hwy St Johns Woods Pkwy Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 Peds 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Right 0 0 0 0 Thru 2855 54 15 2924 Left 156 0 0 156 Peds 0 0 0 0 OutTotal In 2337 3011 5348 40 54 94 9 15 24 2386 5466 3080 Left 71 1 0 72 Thru 0 0 0 0 Right 171 0 1 172 Peds 1 0 0 1 Out TotalIn 220 243 463 0 1 1 0 1 1 220 465 245 Left 0 0 0 0 Thru 2166 40 8 2214 Right 64 0 0 64 Peds 0 0 0 0 TotalOut In 2926 2230 5156 55 40 95 15 8 23 2996 5274 2278 10/22/2025 07:00 10/22/2025 17:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ St Johns Woods Pkwy Site Code : Start Date : 10/22/2025 Page No : 3 Southbound Maybank Hwy Westbound St Johns Woods Pkwy Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 0 0 0 0 0 10 167 0 0 177 9 0 14 0 23 0 91 2 0 93 293 08:15 0 0 0 0 0 8 192 0 0 200 2 0 8 1 11 0 107 6 0 113 324 08:30 0 0 0 0 0 6 194 0 0 200 6 0 12 0 18 0 129 7 0 136 354 08:45 0 0 0 0 0 8 179 0 0 187 5 0 16 0 21 0 124 3 0 127 335 Total Volume 0 0 0 0 0 32 732 0 0 764 22 0 50 1 73 0 451 18 0 469 1306 % App. Total 0 0 0 0 4.2 95.8 0 0 30.1 0 68.5 1.4 0 96.2 3.8 0 PHF .000 .000 .000 .000 .000 .800 .943 .000 .000 .955 .611 .000 .781 .250 .793 .000 .874 .643 .000 .862 .922 Passenger Vehicles 0 0 0 0 0 32 704 0 0 736 22 0 50 1 73 0 439 18 0 457 1266 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 23 0 0 23 0 0 0 0 0 0 12 0 0 12 35 % Heavy Vehicles 0 0 0 0 0 0 3.1 0 0 3.0 0 0 0 0 0 0 2.7 0 0 2.6 2.7 Buses 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 0 0 5 % Buses 0 0 0 0 0 0 0.7 0 0 0.7 0 0 0 0 0 0 0 0 0 0 0.4 Maybank Hwy Maybank Hwy St Johns Woods Pkwy Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 Peds 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Right 0 0 0 0 Thru 704 23 5 732 Left 32 0 0 32 Peds 0 0 0 0 OutTotal In 489 736 1225 12 23 35 0 5 5 501 1265 764 Left 22 0 0 22 Thru 0 0 0 0 Right 50 0 0 50 Peds 1 0 0 1 Out TotalIn 50 73 123 0 0 0 0 0 0 50 123 73 Left 0 0 0 0 Thru 439 12 0 451 Right 18 0 0 18 Peds 0 0 0 0 TotalOut In 726 457 1183 23 12 35 5 0 5 754 1223 469 Peak Hour Begins at 08:00 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ St Johns Woods Pkwy Site Code : Start Date : 10/22/2025 Page No : 4 Southbound Maybank Hwy Westbound St Johns Woods Pkwy Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:30 16:30 0 0 0 0 0 19 170 0 0 189 3 0 27 0 30 0 157 6 0 163 382 16:45 0 0 0 0 0 21 212 0 0 233 6 0 5 0 11 0 152 2 0 154 398 17:00 0 0 0 0 0 13 210 0 0 223 3 0 11 0 14 0 166 6 0 172 409 17:15 0 0 0 0 0 7 206 0 0 213 9 0 8 0 17 0 166 4 0 170 400 Total Volume 0 0 0 0 0 60 798 0 0 858 21 0 51 0 72 0 641 18 0 659 1589 % App. Total 0 0 0 0 7 93 0 0 29.2 0 70.8 0 0 97.3 2.7 0 PHF .000 .000 .000 .000 .000 .714 .941 .000 .000 .921 .583 .000 .472 .000 .600 .000 .965 .750 .000 .958 .971 Passenger Vehicles 0 0 0 0 0 60 793 0 0 853 21 0 51 0 72 0 634 18 0 652 1577 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 9 % Heavy Vehicles 0 0 0 0 0 0 0.3 0 0 0.2 0 0 0 0 0 0 1.1 0 0 1.1 0.6 Buses 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 3 % Buses 0 0 0 0 0 0 0.4 0 0 0.3 0 0 0 0 0 0 0 0 0 0 0.2 Maybank Hwy Maybank Hwy St Johns Woods Pkwy Right 0 0 0 0 Thru 0 0 0 0 Left 0 0 0 0 Peds 0 0 0 0 InOut Total 0 0 0 0 0 0 0 0 0 0 0 0 Right 0 0 0 0 Thru 793 2 3 798 Left 60 0 0 60 Peds 0 0 0 0 OutTotal In 685 853 1538 7 2 9 0 3 3 692 1550 858 Left 21 0 0 21 Thru 0 0 0 0 Right 51 0 0 51 Peds 0 0 0 0 Out TotalIn 78 72 150 0 0 0 0 0 0 78 150 72 Left 0 0 0 0 Thru 634 7 0 641 Right 18 0 0 18 Peds 0 0 0 0 TotalOut In 814 652 1466 2 7 9 3 0 3 819 1478 659 Peak Hour Begins at 16:30 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Fern Hill Dr Site Code : Start Date : 03/12/2025 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Fern Hill Dr Southbound Maybank Hwy Westbound Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 07:00 1 0 0 0 0 121 0 0 0 0 0 0 0 119 0 0 241 07:15 0 0 1 0 1 160 0 0 0 0 0 0 0 109 0 0 271 07:30 1 0 1 0 0 183 0 0 0 0 0 0 0 100 0 0 285 07:45 0 0 0 0 0 174 0 0 0 0 0 0 0 119 0 0 293 Total 2 0 2 0 1 638 0 0 0 0 0 0 0 447 0 0 1090 08:00 0 0 1 0 0 162 1 0 0 0 0 0 0 101 0 0 265 08:15 0 0 0 0 0 173 0 0 0 0 0 0 0 105 1 0 279 08:30 1 0 2 0 0 188 0 0 0 0 0 0 1 118 2 0 312 08:45 0 0 0 1 0 160 0 0 0 0 0 0 0 137 0 0 298 Total 1 0 3 1 0 683 1 0 0 0 0 0 1 461 3 0 1154 16:00 0 0 0 0 0 254 1 0 0 0 0 0 0 178 1 0 434 16:15 1 0 1 0 1 214 1 0 0 0 0 0 0 183 0 0 401 16:30 0 0 0 0 0 237 1 0 0 0 0 0 1 173 0 0 412 16:45 0 0 1 1 0 211 1 0 0 0 0 0 1 179 1 0 395 Total 1 0 2 1 1 916 4 0 0 0 0 0 2 713 2 0 1642 17:00 0 0 0 0 2 210 2 0 0 0 0 0 3 192 0 0 409 17:15 1 0 1 0 0 228 2 0 0 0 0 0 5 160 1 0 398 17:30 0 0 4 0 0 207 0 0 0 0 0 0 1 147 1 0 360 17:45 1 0 1 0 0 189 1 0 0 0 0 0 2 179 1 0 374 Total 2 0 6 0 2 834 5 0 0 0 0 0 11 678 3 0 1541 Grand Total 6 0 13 2 4 3071 10 0 0 0 0 0 14 2299 8 0 5427 Apprch % 28.6 0 61.9 9.5 0.1 99.5 0.3 0 0 0 0 0 0.6 99.1 0.3 0 Total % 0.1 0 0.2 0 0.1 56.6 0.2 0 0 0 0 0 0.3 42.4 0.1 0 Passenger Vehicles 6 0 13 2 4 3015 10 0 0 0 0 0 14 2268 8 0 5340 % Passenger Vehicles 100 0 100 100 100 98.2 100 0 0 0 0 0 100 98.7 100 0 98.4 Heavy Vehicles 0 0 0 0 0 38 0 0 0 0 0 0 0 22 0 0 60 % Heavy Vehicles 0 0 0 0 0 1.2 0 0 0 0 0 0 0 1 0 0 1.1 Buses 0 0 0 0 0 18 0 0 0 0 0 0 0 9 0 0 27 % Buses 0 0 0 0 0 0.6 0 0 0 0 0 0 0 0.4 0 0 0.5 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Fern Hill Dr Site Code : Start Date : 03/12/2025 Page No : 2 Fern Hill Dr Maybank Hwy Maybank Hwy Right 13 0 0 13 Thru 0 0 0 0 Left 6 0 0 6 Peds 2 0 0 2 InOut Total 24 21 45 0 0 0 0 0 0 24 45 21 Right 10 0 0 10 Thru 3015 38 18 3071 Left 4 0 0 4 Peds 0 0 0 0 OutTotal In 2274 3029 5303 22 38 60 9 18 27 2305 5390 3085 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 12 0 12 0 0 0 0 0 0 12 12 0 Left 14 0 0 14 Thru 2268 22 9 2299 Right 8 0 0 8 Peds 0 0 0 0 TotalOut In 3028 2290 5318 38 22 60 18 9 27 3084 5405 2321 03/12/2025 07:00 03/12/2025 17:45 Passenger Vehicles Heavy Vehicles Buses North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Fern Hill Dr Site Code : Start Date : 03/12/2025 Page No : 3 Fern Hill Dr Southbound Maybank Hwy Westbound Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 08:00 08:00 0 0 1 0 1 0 162 1 0 163 0 0 0 0 0 0 101 0 0 101 265 08:15 0 0 0 0 0 0 173 0 0 173 0 0 0 0 0 0 105 1 0 106 279 08:30 1 0 2 0 3 0 188 0 0 188 0 0 0 0 0 1 118 2 0 121 312 08:45 0 0 0 1 1 0 160 0 0 160 0 0 0 0 0 0 137 0 0 137 298 Total Volume 1 0 3 1 5 0 683 1 0 684 0 0 0 0 0 1 461 3 0 465 1154 % App. Total 20 0 60 20 0 99.9 0.1 0 0 0 0 0 0.2 99.1 0.6 0 PHF .250 .000 .375 .250 .417 .000 .908 .250 .000 .910 .000 .000 .000 .000 .000 .250 .841 .375 .000 .849 .925 Passenger Vehicles 1 0 3 1 5 0 663 1 0 664 0 0 0 0 0 1 455 3 0 459 1128 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 0 5 0 0 5 21 % Heavy Vehicles 0 0 0 0 0 0 2.3 0 0 2.3 0 0 0 0 0 0 1.1 0 0 1.1 1.8 Buses 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5 % Buses 0 0 0 0 0 0 0.6 0 0 0.6 0 0 0 0 0 0 0.2 0 0 0.2 0.4 Fern Hill Dr Maybank Hwy Maybank Hwy Right 3 0 0 3 Thru 0 0 0 0 Left 1 0 0 1 Peds 1 0 0 1 InOut Total 2 5 7 0 0 0 0 0 0 2 7 5 Right 1 0 0 1 Thru 663 16 4 683 Left 0 0 0 0 Peds 0 0 0 0 OutTotal In 456 664 1120 5 16 21 1 4 5 462 1146 684 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 3 0 3 0 0 0 0 0 0 3 3 0 Left 1 0 0 1 Thru 455 5 1 461 Right 3 0 0 3 Peds 0 0 0 0 TotalOut In 666 459 1125 16 5 21 4 1 5 686 1151 465 Peak Hour Begins at 08:00 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ Fern Hill Dr Site Code : Start Date : 03/12/2025 Page No : 4 Fern Hill Dr Southbound Maybank Hwy Westbound Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1 Peak Hour for Entire Intersection Begins at 16:00 16:00 0 0 0 0 0 0 254 1 0 255 0 0 0 0 0 0 178 1 0 179 434 16:15 1 0 1 0 2 1 214 1 0 216 0 0 0 0 0 0 183 0 0 183 401 16:30 0 0 0 0 0 0 237 1 0 238 0 0 0 0 0 1 173 0 0 174 412 16:45 0 0 1 1 2 0 211 1 0 212 0 0 0 0 0 1 179 1 0 181 395 Total Volume 1 0 2 1 4 1 916 4 0 921 0 0 0 0 0 2 713 2 0 717 1642 % App. Total 25 0 50 25 0.1 99.5 0.4 0 0 0 0 0 0.3 99.4 0.3 0 PHF .250 .000 .500 .250 .500 .250 .902 1.00 .000 .903 .000 .000 .000 .000 .000 .500 .974 .500 .000 .980 .946 Passenger Vehicles 1 0 2 1 4 1 905 4 0 910 0 0 0 0 0 2 705 2 0 709 1623 % Passenger Vehicles Heavy Vehicles 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 9 % Heavy Vehicles 0 0 0 0 0 0 0.2 0 0 0.2 0 0 0 0 0 0 1.0 0 0 1.0 0.5 Buses 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 1 0 0 1 10 % Buses 0 0 0 0 0 0 1.0 0 0 1.0 0 0 0 0 0 0 0.1 0 0 0.1 0.6 Fern Hill Dr Maybank Hwy Maybank Hwy Right 2 0 0 2 Thru 0 0 0 0 Left 1 0 0 1 Peds 1 0 0 1 InOut Total 6 4 10 0 0 0 0 0 0 6 10 4 Right 4 0 0 4 Thru 905 2 9 916 Left 1 0 0 1 Peds 0 0 0 0 OutTotal In 706 910 1616 7 2 9 1 9 10 714 1635 921 Left 0 0 0 0 Thru 0 0 0 0 Right 0 0 0 0 Peds 0 0 0 0 Out TotalIn 3 0 3 0 0 0 0 0 0 3 3 0 Left 2 0 0 2 Thru 705 7 1 713 Right 2 0 0 2 Peds 0 0 0 0 TotalOut In 907 709 1616 2 7 9 9 1 10 918 1635 717 Peak Hour Begins at 16:00 Passenger Vehicles Heavy Vehicles Buses Peak Hour Data North 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT DRB Maybank Residential Development Traffic Impact Study Appendix B – Historic Growth Rate Data DRAFT Growth 2021 2022 2023 2024 4-Year Growth (%) 10-0267 SC700 : S- 20 (MAIN RD) TO S- 54 (RIVER RD), S- 91 17700 18500 19400 19200 2.7% Station ID Location DRAFT DRB Maybank Residential Development Traffic Impact Study Appendix C – Volume Development Worksheets DRAFT INTERSECTION TRAFFIC VOLUME DEVELOPMENT Maybank Highway at Southwick Drive AM 2025 EXISTING TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Adjusted Turning Movement Counts 1 0 22 319 13 14 596 87 6 4 19 102 14 99 AM Volume Balancing 0 0 29 0 0 57 0 0 0 0 0 0 0 AM 2025 EXISTING TRAFFIC 0 22 348 13 14 653 87 6 4 19 102 14 99 AM Heavy Vehicle Percentage 2% 5% 4% 2% 2% 4% 2% 2% 2% 2% 2% 2% 2% AM 2028 NO-BUILD TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% AM 2028 NO-BUILD TRAFFIC GROWTH 0 2 32 1 1 61 8 1 0 2 9 1 9 AM 2028 NO-BUILD TRAFFIC (No AD) 0 24 380 14 15 714 95 7 4 21 111 15 108 7 14 34 17 TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 7 0 0 0 0 14 0 0 0 34 0 17 AM 2028 NO-BUILD TRAFFIC 0 31 380 14 15 714 109 7 4 21 145 15 125 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 25% Distribution Exiting 25% "AM PROJECT TRIPS" LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 0 3 0 0 8 0 0 0 0 0 0 0 AM TOTAL PROJECT TRIPS 0 0 3 0 0 8 0 0 0 0 0 0 0 -22 22 14 98 -86 -100 -14 -98 -7 7 17 -14 -34 -17 AM 2028 BUILD-OUT TRAFFIC 0 2 412 14 29 837 9 7 4 21 11 1 10 PM 2025 EXISTING TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR PM Adjusted Turning Movement Counts 1 0 127 629 22 17 675 188 11 1 22 51 9 57 PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 0 PM 2025 EXISTING TRAFFIC 0 127 629 22 17 675 188 11 1 22 51 9 57 PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% PM 2028 NO-BUILD TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% PM 2028 NO-BUILD TRAFFIC GROWTH 0 12 58 2 2 63 17 1 0 2 5 1 5 PM 2028 NO-BUILD TRAFFIC (No AD) 0 139 687 24 19 738 205 12 1 24 56 10 62 16 33 22 11 TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 16 0 0 0 0 33 0 0 0 22 0 11 PM 2028 NO-BUILD TRAFFIC 0 155 687 24 19 738 238 12 1 24 78 10 73 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 25% Distribution Exiting 25% "PM PROJECT TRIPS" LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 0 9 0 0 6 0 0 0 0 0 0 0 PM TOTAL PROJECT TRIPS 0 0 9 0 0 6 0 0 0 0 0 0 0 -125 125 9 56 -186 -50 -9 -56 -16 16 11 -33 -22 -11 PM 2028 BUILD-OUT TRAFFIC 0 14 837 24 28 811 19 12 1 24 6 1 6 Approved Development 1: Southwick Drive TIA AM Peak Hour Project Trip PM Peak Hour Approved Development 1: Southwick Drive TIA Background Volume Redistribution Southwick Drive TIA Volume Redistribution Background Volume Redistribution Southwick Drive TIA Volume Redistribution Project Trip DRAFT INTERSECTION TRAFFIC VOLUME DEVELOPMENT Maybank Highway at St. John's Woods Parkway AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Adjusted Turning Movement Counts 1 0 451 18 32 732 0 22 0 50 0 0 0 AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 AM 2025 EXISTING TRAFFIC 0 451 18 32 732 0 22 0 50 0 0 0 AM Heavy Vehicle Percentage 2% 3% 2% 2% 4% 2% 2% 2% 2% 2% 2% 2% AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% AM 2028 NO-BUILD TRAFFIC GROWTH 0 42 2 3 68 0 2 0 5 0 0 0 AM 2028 NO-BUILD TRAFFIC (No AD) 0 493 20 35 800 0 24 0 55 0 0 0 34 14 TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 34 0 0 14 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC 0 527 20 35 814 0 24 0 55 0 0 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 25% 20% Distribution Exiting 10% 40% 15% "AM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 3 0 0 0 3 3 0 0 0 13 0 5 AM TOTAL PROJECT TRIPS 3 0 0 0 3 3 0 0 0 13 0 5 22 -100 -86 86 100 112 7 34 -14 14 34 17 AM 2028 BUILD-OUT TRAFFIC 32 461 20 35 717 103 24 0 55 147 0 134 PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR PM Adjusted Turning Movement Counts 1 0 641 18 60 798 0 21 0 51 0 0 0 PM Volume Balancing 0 43 0 0 61 0 0 0 0 0 0 0 PM 2025 EXISTING TRAFFIC 0 684 18 60 859 0 21 0 51 0 0 0 PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% PM 2028 NO-BUILD TRAFFIC GROWTH 0 63 2 6 80 0 2 0 5 0 0 0 PM 2028 NO-BUILD TRAFFIC (No AD) 0 747 20 66 939 0 23 0 56 0 0 0 22 33 TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 22 0 0 33 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC 0 769 20 66 972 0 23 0 56 0 0 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 25% 20% Distribution Exiting 10% 40% 15% "PM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 9 0 0 0 3 7 0 0 0 9 0 3 PM TOTAL PROJECT TRIPS 9 0 0 0 3 7 0 0 0 9 0 3 125 -50 -186 186 50 65 16 -22 -33 33 22 11 PM 2028 BUILD-OUT TRAFFIC 150 697 20 66 756 226 23 0 56 81 0 79 Project Trip AM Peak Hour Approved Development 1: Southwick Drive TIA Background Volume Redistribution Southwick Drive TIA Volume Redistribution Background Volume Redistribution Southwick Drive TIA Volume Redistribution Project Trip PM Peak Hour Approved Development 1: Southwick Drive TIA DRAFT INTERSECTION TRAFFIC VOLUME DEVELOPMENT Maybank Highway at Fern Hill Drive AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Adjusted Turning Movement Counts 1 1 461 3 0 683 1 0 0 0 1 0 3 AM Volume Balancing 0 39 -3 0 78 0 0 0 0 0 0 0 AM 2025 EXISTING TRAFFIC 1 500 0 0 761 1 0 0 0 1 0 3 AM Heavy Vehicle Percentage 2% 2% 2% 2% 3% 2% 2% 2% 2% 2% 2% 2% AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% AM 2028 NO-BUILD TRAFFIC GROWTH 0 46 0 0 71 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC (No AD) 1 546 0 0 832 1 0 0 0 1 0 3 34 TOTAL AM APPROVED DEVELOPMENT TRAFFIC 34 0 0 0 14 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC 35 546 0 0 846 1 0 0 0 1 0 3 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 20% 30% Distribution Exiting 40% 10% 10% "AM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 13 0 0 2 4 0 0 0 3 0 4 AM TOTAL PROJECT TRIPS 0 13 0 0 2 4 0 0 0 3 0 4 AM 2028 BUILD-OUT TRAFFIC 35 559 0 0 848 5 0 0 0 4 0 7 PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR PM Adjusted Turning Movement Counts 1 2 713 2 1 916 4 0 0 0 1 0 2 PM Volume Balancing 0 20 -2 0 0 0 0 0 0 0 0 1 PM 2025 EXISTING TRAFFIC 2 733 0 1 916 4 0 0 0 1 0 3 PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% PM 2028 NO-BUILD TRAFFIC GROWTH 0 68 0 0 85 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC (No AD) 2 801 0 1 1,001 4 0 0 0 1 0 3 22 33 TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 22 0 0 33 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC 2 823 0 1 1,034 4 0 0 0 1 0 3 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 20% 30% Distribution Exiting 40% 10% 10% "PM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 9 0 0 7 11 0 0 0 2 0 3 PM TOTAL PROJECT TRIPS 0 9 0 0 7 11 0 0 0 2 0 3 PM 2028 BUILD-OUT TRAFFIC 2 832 0 1 1,041 15 0 0 0 3 0 6 Project Trip AM Peak Hour Approved Development 1: Southwick Drive TIA Background Volume Redistribution Southwick Drive TIA Volume Redistribution Background Volume Redistribution Southwick Drive TIA Volume Redistribution Project Trip PM Peak Hour Approved Development 1: Southwick Drive TIA DRAFT INTERSECTION TRAFFIC VOLUME DEVELOPMENT Fern Hill Drive at Cross Island Extension AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 2 0 0 4 0 AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 AM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 2 0 0 4 0 AM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% AM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 2 0 0 4 0 TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 2 0 0 4 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 30% Distribution Exiting 20% "AM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 0 7 0 0 0 4 0 0 0 0 0 AM TOTAL PROJECT TRIPS 0 0 7 0 0 0 4 0 0 0 0 0 AM 2028 BUILD-OUT TRAFFIC 0 0 7 0 0 0 4 2 0 0 4 0 PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR PM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 6 0 0 3 0 PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 1 0 PM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 6 0 0 4 0 PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% PM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 1 0 0 0 0 PM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 7 0 0 4 0 TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 7 0 0 4 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 30% Distribution Exiting 20% "PM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 0 5 0 0 0 11 0 0 0 0 0 PM TOTAL PROJECT TRIPS 0 0 5 0 0 0 11 0 0 0 0 0 PM 2028 BUILD-OUT TRAFFIC 0 0 5 0 0 0 11 7 0 0 4 0 Project Trip AM Peak Hour Approved Development 1: Southwick Drive TIA Background Volume Redistribution Southwick Drive TIA Volume Redistribution Background Volume Redistribution Southwick Drive TIA Volume Redistribution Project Trip PM Peak Hour Approved Development 1: Southwick Drive TIA DRAFT INTERSECTION TRAFFIC VOLUME DEVELOPMENT Project Driveway #1 at Cross Island Extension AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0 AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 AM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 AM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% AM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 20% 5% 15% Distribution Exiting 30% 20% 5% "AM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 2 1 10 7 0 2 0 2 0 0 0 AM TOTAL PROJECT TRIPS 0 2 1 10 7 0 2 0 2 0 0 0 212 108 51 AM 2028 BUILD-OUT TRAFFIC 0 2 264 10 7 0 110 0 2 0 0 0 PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR PM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0 PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 PM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% PM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 20% 5% 15% Distribution Exiting 30% 20% 5% "PM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 7 2 7 5 0 1 0 5 0 0 0 PM TOTAL PROJECT TRIPS 0 7 2 7 5 0 1 0 5 0 0 0 115 311 33 PM 2028 BUILD-OUT TRAFFIC 0 7 150 7 5 0 312 0 5 0 0 0 Project Trip AM Peak Hour Approved Development 1: Southwick Drive TIA Background Volume Redistribution Southwick Drive TIA Volume Redistribution Background Volume Redistribution Southwick Drive TIA Volume Redistribution Project Trip PM Peak Hour Approved Development 1: Southwick Drive TIA DRAFT INTERSECTION TRAFFIC VOLUME DEVELOPMENT Southwick Drive at Cross Island Extension AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR AM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0 AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 AM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 AM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% AM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 AM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 25% Distribution Exiting 25% "AM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 3 0 0 9 0 0 0 0 0 0 0 AM TOTAL PROJECT TRIPS 0 3 0 0 9 0 0 0 0 0 0 0 212 22 108 51 AM 2028 BUILD-OUT TRAFFIC 0 266 22 0 117 0 15 0 0 0 0 0 PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR PM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0 PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 PM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% PM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0 TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 PM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0 "SITE TRAFFIC DISTRUBUTION" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New Entering 25% Distribution Exiting 25% "PM PROJECT TRIPS" LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Net New 0 9 0 0 6 0 0 0 0 0 0 0 PM TOTAL PROJECT TRIPS 0 9 0 0 6 0 0 0 0 0 0 0 115 13 311 33 PM 2028 BUILD-OUT TRAFFIC 0 157 13 0 317 0 34 0 0 0 0 0 Project Trip AM Peak Hour Approved Development 1: Southwick Drive TIA Background Volume Redistribution Southwick Drive TIA Volume Redistribution Background Volume Redistribution Southwick Drive TIA Volume Redistribution Project Trip PM Peak Hour Approved Development 1: Southwick Drive TIA DRAFT DRB Maybank Residential Development Traffic Impact Study Appendix D – Traffic Signal Warrant Analysis Worksheets DRAFT Southwick TIA ITE Data Land Use Code Land Use Setting Time Period Time Total Entering Exiting Total Entering Exiting Total Entering Exiting 6:00 - 7:00 AM 3.7% 1.6% 5.8% 3.5% 1.1% 5.8% 4.2% 1.4% 6.9% 7:00 - 8:00 AM 6.5% 3.1% 10.0% 7.9% 2.7% 13.2% 6.5% 2.0% 10.8% 8:00 - 9:00 AM 6.2% 3.8% 8.5% 6.6% 3.8% 9.3% 5.8% 3.1% 8.5% 9:00 - 10:00 AM 4.6% 3.3% 5.8% 5.3% 3.7% 6.9% 3.9% 2.9% 4.9% 10:00 - 11:00 AM 4.9% 4.2% 5.6% 4.1% 4.0% 4.3% 3.6% 2.4% 4.8% 11:00 - 12:00 PM 5.3% 5.4% 5.1% 5.3% 4.8% 5.7% 4.3% 3.8% 4.7% 12:00 - 1:00 PM 5.7% 5.7% 5.7% 5.2% 5.4% 5.1% 4.3% 4.5% 4.1% 1:00 - 2:00 PM 6.1% 6.1% 6.0% 4.7% 4.5% 4.8% 4.2% 4.0% 4.4% 2:00 - 3:00 PM 6.6% 7.1% 6.1% 5.8% 5.5% 6.0% 5.2% 5.6% 4.9% 3:00 - 4:00 PM 7.5% 8.7% 6.2% 6.5% 8.2% 4.8% 6.1% 6.9% 5.3% 4:00 - 5:00 PM 8.9% 10.5% 7.4% 7.5% 9.8% 5.1% 7.9% 10.1% 5.6% 5:00 - 6:00 PM 8.7% 10.0% 7.3% 9.4% 12.1% 6.8% 9.5% 11.4% 7.6% Daily In Out 6:00 - 7:00 PM 7.2% 8.5% 5.9% 8.2% 9.8% 6.6% 8.2% 9.7% 6.7% LUC 210 76 38 38 LUC 215 833 417 416 Land Use Code LUC 220 306 153 153 Land Use Time Total Entering Exiting Total Entering Exiting Total Entering Exiting Time Total Entering Exiting 6:00 - 7:00 AM 3 1 2 29 4 24 13 2 11 6:00 - 7:00 AM 45 7 37 7:00 - 8:00 AM 5 1 4 66 11 55 20 3 17 7:00 - 8:00 AM 91 15 76 8:00 - 9:00 AM 5 1 3 55 16 39 18 5 13 8:00 - 9:00 AM 78 22 55 9:00 - 10:00 AM 3 1 2 44 16 29 12 4 7 9:00 - 10:00 AM 59 21 38 10:00 - 11:00 AM 4 2 2 35 17 18 11 4 7 10:00 - 11:00 AM 50 23 27 11:00 - 12:00 PM 4 2 2 44 20 24 13 6 7 11:00 - 12:00 PM 61 28 33 12:00 - 1:00 PM 4 2 2 44 23 21 13 7 6 12:00 - 1:00 PM 61 32 29 1:00 - 2:00 PM 5 2 2 39 19 20 13 6 7 1:00 - 2:00 PM 57 27 29 2:00 - 3:00 PM 5 3 2 48 23 25 16 9 7 2:00 - 3:00 PM 69 35 34 3:00 - 4:00 PM 6 3 2 54 34 20 19 11 8 3:00 - 4:00 PM 79 48 30 4:00 - 5:00 PM 7 4 3 62 41 21 24 15 9 4:00 - 5:00 PM 93 60 33 5:00 - 6:00 PM 7 4 3 79 50 28 29 17 12 5:00 - 6:00 PM 115 71 43 6:00 - 7:00 PM 5 3 2 68 41 27 25 15 10 6:00 - 7:00 PM 98 59 39 210 215 Single-Family Detached Housing Single-Family Attached Housing 220 Multifamily Housing (Low-Rise) % of 24-Hour Vehicle Trips % of 24-Hour Vehicle Trips % of 24-Hour Vehicle Trips General Urban/Suburban General Urban/Suburban General Urban/Suburban Weekday Weekday Weekday 210 215 220 Single-Family Detached Housing Single-Family Attached Housing Multifamily Housing (Low-Rise) DRAFT DRB Maybank ITE Data Land Use Code Land Use Setting Time Period Time Total Entering Exiting Total Entering Exiting 6:00 - 7:00 AM 3.7% 1.6% 5.8% 3.5% 1.1% 5.8% 7:00 - 8:00 AM 6.5% 3.1% 10.0% 7.9% 2.7% 13.2% 8:00 - 9:00 AM 6.2% 3.8% 8.5% 6.6% 3.8% 9.3% 9:00 - 10:00 AM 4.6% 3.3% 5.8% 5.3% 3.7% 6.9% 10:00 - 11:00 AM 4.9% 4.2% 5.6% 4.1% 4.0% 4.3% 11:00 - 12:00 PM 5.3% 5.4% 5.1% 5.3% 4.8% 5.7% 12:00 - 1:00 PM 5.7% 5.7% 5.7% 5.2% 5.4% 5.1% 1:00 - 2:00 PM 6.1% 6.1% 6.0% 4.7% 4.5% 4.8% 2:00 - 3:00 PM 6.6% 7.1% 6.1% 5.8% 5.5% 6.0% 3:00 - 4:00 PM 7.5% 8.7% 6.2% 6.5% 8.2% 4.8% 4:00 - 5:00 PM 8.9% 10.5% 7.4% 7.5% 9.8% 5.1% 5:00 - 6:00 PM 8.7% 10.0% 7.3% 9.4% 12.1% 6.8% Daily In Out 6:00 - 7:00 PM 7.2% 8.5% 5.9% 8.2% 9.8% 6.6% LUC 210 414 207 207 LUC 220 239 120 119 Land Use Code Land Use Time Total Entering Exiting Total Entering Exiting Time Total Entering Exiting 6:00 - 7:00 AM 15 3 12 8 1 7 6:00 - 7:00 AM 23 4 19 7:00 - 8:00 AM 27 6 21 19 3 16 7:00 - 8:00 AM 46 9 37 8:00 - 9:00 AM 26 8 18 16 5 11 8:00 - 9:00 AM 42 13 29 9:00 - 10:00 AM 19 7 12 13 4 8 9:00 - 10:00 AM 32 11 20 10:00 - 11:00 AM 20 9 12 10 5 5 10:00 - 11:00 AM 30 14 17 11:00 - 12:00 PM 22 11 11 13 6 7 11:00 - 12:00 PM 35 17 18 12:00 - 1:00 PM 24 12 12 13 7 6 12:00 - 1:00 PM 37 19 18 1:00 - 2:00 PM 25 13 12 11 5 6 1:00 - 2:00 PM 36 18 18 2:00 - 3:00 PM 27 15 13 14 7 7 2:00 - 3:00 PM 41 22 20 3:00 - 4:00 PM 31 18 13 16 10 6 3:00 - 4:00 PM 47 28 19 4:00 - 5:00 PM 37 22 15 18 12 6 4:00 - 5:00 PM 55 34 21 5:00 - 6:00 PM 36 21 15 23 15 8 5:00 - 6:00 PM 59 36 23 6:00 - 7:00 PM 30 18 12 20 12 8 6:00 - 7:00 PM 50 30 20 210 215 Single-Family Detached Housing Single-Family Attached Housing 215 Single-Family Attached Housing General Urban/Suburban Weekday % of 24-Hour Vehicle Trips 210 Single-Family Detached Housing General Urban/Suburban Weekday % of 24-Hour Vehicle Trips DRAFT Existing Traffic Volumes U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 6:00 AM 0 0 489 0 0 5 322 0 0 4 0 35 0 0 0 0 855 7:00 AM 0 0 411 11 0 16 691 0 0 20 0 48 0 0 0 0 1,197 8:00 AM 0 0 438 16 0 25 733 0 0 29 0 30 0 0 0 0 1,271 9:00 AM 0 0 444 14 0 25 593 0 0 15 0 32 0 0 0 0 1,123 10:00 AM 0 0 561 11 0 24 585 0 0 10 0 39 0 0 0 0 1,230 11:00 AM 0 0 592 11 0 38 616 0 0 12 0 45 0 0 0 0 1,314 12:00 PM 0 0 650 22 0 57 663 0 0 17 0 43 0 0 0 0 1,452 1:00 PM 0 0 575 17 0 44 665 0 0 9 0 40 0 0 0 0 1,350 2:00 PM 0 0 609 22 0 47 714 0 0 18 0 37 0 0 0 0 1,447 3:00 PM 0 0 617 10 0 47 729 0 0 16 0 22 0 0 0 0 1,441 4:00 PM 0 0 708 21 0 61 831 0 0 17 0 48 0 0 0 0 1,686 5:00 PM 0 0 570 26 0 66 841 0 0 16 0 30 0 0 0 0 1,549 6:00 PM 0 0 575 14 0 60 695 0 0 9 0 30 0 0 0 0 1,383 U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 6:00 AM 0 3 339 9 0 7 318 23 0 5 3 10 0 87 9 30 843 7:00 AM 0 29 250 9 0 7 617 61 0 7 5 9 0 101 6 111 1,212 8:00 AM 0 28 348 25 0 21 599 99 0 17 3 11 0 113 8 93 1,365 9:00 AM 0 20 413 16 0 18 544 62 0 13 7 15 0 73 11 40 1,232 10:00 AM 0 30 470 14 0 14 600 84 0 14 3 16 0 57 5 38 1,345 11:00 AM 0 51 612 17 0 16 565 86 0 12 0 19 0 73 3 44 1,498 12:00 PM 0 42 532 13 0 16 601 104 0 15 5 18 0 88 7 34 1,475 1:00 PM 0 40 558 16 0 18 535 89 0 13 5 15 0 54 4 36 1,383 2:00 PM 0 64 567 19 0 17 681 111 0 8 5 24 0 58 6 40 1,600 3:00 PM 0 109 553 14 0 12 640 169 0 9 0 13 0 69 4 41 1,633 4:00 PM 0 139 639 23 0 16 598 185 0 15 3 23 0 57 5 45 1,748 5:00 PM 0 106 560 22 0 15 505 174 0 16 10 19 0 57 9 26 1,519 6:00 PM 0 44 434 13 0 16 418 119 0 19 5 26 0 46 6 13 1,159 Time MAYBANK HWY MAYBANK HWY SOUTHWICK DR SOUTHWICK DR Total Eastbound Westbound Northbound Southbound Time MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY - Total Eastbound Westbound Northbound Southbound DRAFT DRB Maybank Residential Development Project Site Trips Entering Distribution 25% 20% Exiting Distribution 10% 40% 15% U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 6:00 AM 0 1 0 0 0 0 2 1 0 0 0 0 0 8 0 3 15 7:00 AM 0 2 0 0 0 0 4 2 0 0 0 0 0 15 0 6 29 8:00 AM 0 3 0 0 0 0 3 3 0 0 0 0 0 12 0 4 25 9:00 AM 0 3 0 0 0 0 2 2 0 0 0 0 0 8 0 3 18 10:00 AM 0 4 0 0 0 0 2 3 0 0 0 0 0 7 0 3 19 11:00 AM 0 4 0 0 0 0 2 3 0 0 0 0 0 7 0 3 19 12:00 PM 0 5 0 0 0 0 2 4 0 0 0 0 0 7 0 3 21 1:00 PM 0 5 0 0 0 0 2 4 0 0 0 0 0 7 0 3 21 2:00 PM 0 6 0 0 0 0 2 4 0 0 0 0 0 8 0 3 23 3:00 PM 0 7 0 0 0 0 2 6 0 0 0 0 0 8 0 3 26 4:00 PM 0 9 0 0 0 0 2 7 0 0 0 0 0 8 0 3 29 5:00 PM 0 9 0 0 0 0 2 7 0 0 0 0 0 9 0 3 30 6:00 PM 0 8 0 0 0 0 2 6 0 0 0 0 0 8 0 3 27 Southwick TIA Approved Development Trip Diversion Entering Distribution 25% 50% Exiting Distribution 50% 25% U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 6:00 AM 0 2 0 0 0 0 0 4 0 0 0 0 0 19 0 9 34 7:00 AM 0 4 0 0 0 0 0 8 0 0 0 0 0 38 0 19 69 8:00 AM 0 6 0 0 0 0 0 11 0 0 0 0 0 28 0 14 59 9:00 AM 0 5 0 0 0 0 0 11 0 0 0 0 0 19 0 10 45 10:00 AM 0 6 0 0 0 0 0 12 0 0 0 0 0 14 0 7 39 11:00 AM 0 7 0 0 0 0 0 14 0 0 0 0 0 17 0 8 46 12:00 PM 0 8 0 0 0 0 0 16 0 0 0 0 0 15 0 7 46 1:00 PM 0 7 0 0 0 0 0 14 0 0 0 0 0 15 0 7 43 2:00 PM 0 9 0 0 0 0 0 18 0 0 0 0 0 17 0 9 53 3:00 PM 0 12 0 0 0 0 0 24 0 0 0 0 0 15 0 8 59 4:00 PM 0 15 0 0 0 0 0 30 0 0 0 0 0 17 0 8 70 5:00 PM 0 18 0 0 0 0 0 36 0 0 0 0 0 22 0 11 87 6:00 PM 0 15 0 0 0 0 0 30 0 0 0 0 0 20 0 10 75 Southwick Drive Existing Traffic Volume Diversion: 90% U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 6:00 AM 3 -3 -21 21 78 27 105 7:00 AM 26 -26 -55 55 91 100 191 8:00 AM 25 -25 -89 89 102 84 186 9:00 AM 18 -18 -56 56 66 36 102 10:00 AM 27 -27 -76 76 51 34 85 11:00 AM 46 -46 -77 77 66 40 106 12:00 PM 38 -38 -94 94 79 31 110 1:00 PM 36 -36 -80 80 49 32 81 2:00 PM 58 -58 -100 100 52 36 88 3:00 PM 98 -98 -152 152 62 37 99 4:00 PM 125 -125 -167 167 51 41 92 5:00 PM 95 -95 -157 157 51 23 74 6:00 PM 40 -40 -107 107 41 12 53 Total Eastbound Westbound Northbound Southbound Time MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY Time MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY Total Eastbound Westbound Northbound Southbound Time MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY Total Eastbound Westbound Northbound Southbound DRAFT Existing Traffic Volumes with DRB Maybank Trips, Southwick Trips, and Southwick Road Diversion U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right 6:00 AM 0 6 486 0 0 5 303 26 0 4 0 35 0 105 0 39 1,009 7:00 AM 0 32 385 11 0 16 640 65 0 20 0 48 0 144 0 125 1,486 8:00 AM 0 34 413 16 0 25 647 103 0 29 0 30 0 142 0 102 1,541 9:00 AM 0 26 426 14 0 25 539 69 0 15 0 32 0 93 0 49 1,288 10:00 AM 0 37 534 11 0 24 511 91 0 10 0 39 0 72 0 44 1,373 11:00 AM 0 57 546 11 0 38 541 94 0 12 0 45 0 90 0 51 1,485 12:00 PM 0 51 612 22 0 57 571 114 0 17 0 43 0 101 0 41 1,629 1:00 PM 0 48 539 17 0 44 587 98 0 9 0 40 0 71 0 42 1,495 2:00 PM 0 73 551 22 0 47 616 122 0 18 0 37 0 77 0 48 1,611 3:00 PM 0 117 519 10 0 47 579 182 0 16 0 22 0 85 0 48 1,625 4:00 PM 0 149 583 21 0 61 666 204 0 17 0 48 0 76 0 52 1,877 5:00 PM 0 122 475 26 0 66 686 200 0 16 0 30 0 82 0 37 1,740 6:00 PM 0 63 535 14 0 60 590 143 0 9 0 30 0 69 0 25 1,538 Time MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY Total Eastbound Westbound Northbound Southbound DRAFT Y N N 1 1 100% Major Minor Major Minor Major Minor Major Minor Minor Minor Total Street Street Street Street Street Street Street Street Delay Volume Intrsctn 12:00 AM TO 01:00 AM 01:00 AM TO 02:00 AM 02:00 AM TO 03:00 AM 03:00 AM TO 04:00 AM 04:00 AM TO 05:00 AM 05:00 AM TO 06:00 AM 06:00 AM TO 07:00 AM 826 105 236% 100% 157% 198% 207% 88% 138% 175% 07:00 AM TO 08:00 AM 1149 144 328% 137% 219% 272% 287% 120% 192% 240% 08:00 AM TO 09:00 AM 1238 142 354% 135% 236% 268% 310% 118% 206% 237% 09:00 AM TO 10:00 AM 1099 93 314% 89% 209% 175% 275% 78% 183% 155% 10:00 AM TO 11:00 AM 1208 72 345% 69% 230% 136% 302% 60% 201% 120% 11:00 AM TO 12:00 PM 1287 90 368% 86% 245% 170% 322% 75% 215% 150% 12:00 PM TO 01:00 PM 1427 101 408% 96% 272% 191% 357% 84% 238% 168% 01:00 PM TO 02:00 PM 1333 71 381% 68% 254% 134% 333% 59% 222% 118% 02:00 PM TO 03:00 PM 1431 77 409% 73% 273% 145% 358% 64% 239% 128% 03:00 PM TO 04:00 PM 1454 85 415% 81% 277% 160% 364% 71% 242% 142% 04:00 PM TO 05:00 PM 1684 76 481% 72% 321% 143% 421% 63% 281% 127% 05:00 PM TO 06:00 PM 1575 82 450% 78% 300% 155% 394% 68% 263% 137% 06:00 PM TO 07:00 PM 1405 69 401% 66% 268% 130% 351% 58% 234% 115% 07:00 PM TO 08:00 PM 08:00 PM TO 09:00 PM 09:00 PM TO 10:00 PM 10:00 PM TO 11:00 PM 11:00 PM TO 12:00 AM 350 105 525 53 400 120 600 60 TOTAL 3 TOTAL 13 TOTAL 2 TOTAL 13 TOTAL 13 TOTAL 9 Met? NO Met? YES TOTAL 2 Met? NO Met? Yes Met? Yes TRAFFIC SIGNAL WARRANT ANALYSIS City/County: Johns Island 85th-percentile speed on the major street exceeds 40 mph? (Y or N) This considers the existing traffic volumes with the DRB Maybank Project Trips, Southwick TIA Project Trips, and diversion of traffic expected from the Southwick Road intersection. Warrant 1, Condition B and Warrant 2 thresholds are exceeded and therefore meets warrants for a traffic signal. Date: 4/30/2026 Apply 56% warrant to Warrant 1, Combination Warrant? (Y or N) Analyzed by: Kimley-Horn State: South Carolina Isolated community with a population of less than 10,000? (Y or N) Analyzed by: WDS Major Street: Maybank Highway Approach Lanes - Major? (1 or 2) Minor Street: St Johns Woods Parkway/Project Driveway Approach Lanes - Minor? (1 or 2) Right-Turn Reduction: Warrant 2 Warrant 3, Condition A Warrant 3, Condition B 80% of 1A 80% of 1B24-Hour Volume Summary Major Street Minor Street Warrant 1, Condition A Warrant 1, Condition B Warrant 1, Combination Warrant Total of Both Approaches Higher Volume 175% 91% 240% 192% 237% 189% 155% 124% 120% 96% 150% 120% 168% 135% 118% 95% 128% 103% 142% 113% 127% 101% 137% 109% MUTCD Figure 115% 92% Threshold Threshold Threshold Threshold MUTCD Figure Warranting Volumes TOTAL Source: MUTCD, 2009 Edition 4C-1 and 4C-2 4C-3 and 4C-4 Created By: Kimley-Horn and Associates, Inc. Summary Summary Summary Summary Met? Summary Summary Summary COMMENTS/NOTES: COMMENTS/NOTES: DRAFT SOUTHWICK DR SOUTHWICK DRMAYBANK HWYMAYBANK HWY (303) 216-2439 www.alltrafficdata.net Location: 1 SOUTHWICK DR & MAYBANK HWY AM Thursday, October 31, 2024Date: Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - Pedestrians Traffic Counts - Motorized Vehicles Note: Total study counts contained in parentheses. Peak Hour: 03:45 PM - 04:45 PM Peak 15-Minutes: 04:00 PM - 04:15 PM 113 338 811 725 4040 801 662 0.93 N S EW 0.91 0.93 0.69 0.94 (2,125)(1,607) (8,780) (7,428) (7,975) (7,190) (435)(484) 44 0 63 191 605 15 19 637 145 0 0 613 2 25 0 MAYBANK HWY MAYBANK HWY SOUTHWICK DR SOUTHWICK DR 0 0 0 0 N S EW 00 00 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 N S EW 0 0 0 0 0 0 0 0 0 0 0 0 Left Thru Right Total EastboundInterval Start Time Rolling Hour West East South North Pedestrian Crossings U-Turn Westbound Northbound Southbound Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn 6:00 AM 0 1 1 0 14 10 1 48 0 2 38 119 0 0 0 08433 2 4 4 6:15 AM 0 1 0 0 23 20 1 86 0 1 68 192 0 0 0 09721 4 0 5 6:30 AM 0 0 0 0 33 30 0 109 0 3 79 240 0 0 0 01,0651 3 3 6 6:45 AM 0 3 2 0 17 30 1 96 0 1 133 292 0 0 0 01,1674 14 3 15 7:00 AM 0 1 0 0 18 00 6 64 0 3 116 248 0 0 0 01,2121 9 2 28 7:15 AM 0 2 2 0 27 20 10 61 0 1 138 285 0 0 0 01,3141 17 3 21 7:30 AM 0 1 0 0 28 10 6 68 0 1 187 342 0 0 1 01,3774 16 0 30 7:45 AM 0 3 3 0 28 30 7 57 0 2 176 337 0 0 0 01,3643 19 4 32 8:00 AM 0 5 2 0 28 20 6 83 0 8 150 350 0 0 1 01,3654 25 2 35 8:15 AM 0 4 0 0 21 30 15 87 0 2 155 348 0 0 0 01,3156 28 3 24 8:30 AM 0 2 0 0 31 10 4 80 0 9 155 329 0 0 0 01,2777 18 3 19 8:45 AM 0 6 1 0 33 20 3 98 0 2 139 338 0 0 0 01,2438 28 3 15 9:00 AM 0 2 1 0 18 40 3 79 0 7 152 300 0 0 0 01,2321 19 3 11 9:15 AM 0 5 2 0 17 40 6 103 0 4 134 310 0 0 1 01,2836 14 4 11 9:30 AM 0 2 2 0 14 10 7 104 0 3 134 295 0 0 0 01,2843 10 5 10 9:45 AM 0 4 2 0 24 20 4 127 0 4 124 327 0 0 0 01,3076 19 3 8 10:00 AM 0 3 1 0 6 10 4 119 0 4 165 351 0 0 0 01,3453 33 3 9 10:15 AM 0 5 2 0 16 20 7 113 0 3 133 311 0 0 0 01,3602 13 7 8 10:30 AM 0 4 0 0 15 10 12 107 0 0 144 318 0 0 0 01,4065 23 0 7 10:45 AM 0 2 0 0 20 10 7 131 0 7 158 365 0 0 0 01,4784 15 6 14 11:00 AM 0 4 0 0 16 00 11 164 0 5 128 366 0 0 0 01,4983 23 4 8 11:15 AM 0 3 0 0 19 00 15 143 0 3 137 357 0 0 0 01,5024 16 7 10 11:30 AM 0 3 0 0 19 10 14 156 0 0 154 390 0 0 0 01,5205 20 5 13 11:45 AM 0 2 0 0 19 20 11 149 0 8 146 385 0 0 0 01,4805 27 3 13 12:00 PM 0 3 2 0 18 30 15 123 0 2 156 370 0 0 0 01,4755 23 7 13 12:15 PM 0 2 1 0 23 30 9 148 0 10 146 375 0 0 0 01,4851 24 2 6 12:30 PM 0 7 2 0 21 10 8 138 0 2 132 350 0 0 0 01,4634 27 2 6 12:45 PM 0 3 0 0 26 00 10 123 0 2 167 380 0 0 0 01,4553 30 7 9 1:00 PM 0 2 2 0 14 10 12 160 0 3 151 380 0 0 0 01,3834 21 4 6 1:15 PM 0 3 0 0 21 00 9 138 0 5 137 353 0 0 0 01,5084 24 4 8 1:30 PM 0 7 1 0 10 20 11 149 0 3 126 342 0 0 0 01,5074 15 4 10 1:45 PM 0 1 2 0 9 10 8 111 0 7 121 308 0 0 0 01,5604 29 3 12 2:00 PM 0 2 3 0 7 00 12 170 1 7 250 505 0 0 0 01,6009 28 6 10 2:15 PM 0 3 0 0 14 30 15 119 0 5 152 352 0 0 1 01,4941 28 6 6 DRAFT Peak Rolling Hour Flow Rates Heavy Vehicle Percentage and Peak Hour Factor 2:30 PM 0 3 0 0 17 10 26 153 0 1 146 395 0 0 1 01,5143 23 5 17 2:45 PM 0 0 2 0 20 20 11 125 0 3 133 348 0 0 0 01,5456 32 7 7 3:00 PM 0 5 0 0 16 10 22 140 0 3 156 399 1 0 1 01,6333 40 2 11 3:15 PM 0 1 0 0 24 00 26 119 0 4 152 372 0 0 0 01,7102 32 3 9 3:30 PM 0 0 0 0 10 00 30 142 0 2 181 426 0 0 0 01,7546 43 3 9 3:45 PM 0 3 0 0 19 30 31 152 0 3 151 436 0 0 0 01,7653 54 5 12 4:00 PM 0 4 1 0 18 10 28 180 0 3 160 476 0 0 0 01,7486 52 10 13 4:15 PM 0 4 0 0 16 00 40 150 0 5 149 416 0 0 0 01,6584 37 2 9 4:30 PM 0 2 1 0 10 20 46 155 0 4 145 437 0 0 0 01,6386 48 8 10 4:45 PM 0 5 1 0 13 20 25 154 0 4 144 419 0 0 0 01,5737 48 3 13 5:00 PM 0 3 2 0 18 20 29 146 0 2 119 386 0 0 0 01,5195 49 2 9 5:15 PM 0 3 4 0 15 30 25 143 0 3 131 396 0 0 0 01,4826 45 6 12 5:30 PM 0 6 3 0 16 10 29 138 0 6 120 372 0 0 0 01,4127 37 6 3 5:45 PM 0 4 1 0 8 30 23 133 1 3 135 365 0 0 0 01,2854 43 5 2 6:00 PM 0 5 1 0 16 10 21 127 0 3 115 349 0 0 0 01,1593 47 4 6 6:15 PM 0 3 1 0 12 20 8 132 0 6 115 326 0 0 0 03 32 8 4 6:30 PM 0 3 1 0 12 20 8 85 0 5 102 245 0 0 0 02 17 6 2 6:45 PM 0 8 2 0 6 10 7 90 0 2 86 239 0 0 0 05 23 8 1 Vehicle Type Left Thru Right Eastbound U-Turn Westbound Northbound Southbound TotalLeft Thru RightU-Turn Left Thru RightU-TurnLeft Thru RightU-Turn Articulated Trucks 0 0 0 0 0 00 1 0 0 0 0 10 0 0 0 Lights 13 2 25 63 6 43142 633 19 15 597 189 1,7470 0 0 0 Mediums 0 0 0 0 0 13 3 0 0 8 2 170 0 0 0 Total 145 637 19 15 605 191 13 2 25 63 6 44 1,7650 0 0 0 Left Thru Right Total Eastbound U-Turn Westbound Northbound Southbound Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.2% 0.0% 0.0% 0.0% 0.1%0.0% 0.0% 0.0% 0.0% Heavy Vehicle % Heavy Vehicle % Peak Hour Factor Peak Hour Factor 0.1% 0.0% 0.0% 0.0% 0.1% 0.93 0.94 0.93 0.69 0.91 0.93 0.00 0.59 0.63 0.00 0.86 0.690.00 0.79 0.89 0.25 0.55 0.680.78 0.88 0.81 0.86 DRAFT File Name : Maybank Hwy @ St Johns Woods Pkwy Site Code : Start Date : 04/21/2026 Page No : 1 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Southbound Maybank Hwy Westbound St Johns Woods Pkwy Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 06:00 0 0 0 0 1 55 0 0 1 0 7 0 0 93 0 0 157 06:15 0 0 0 0 1 64 0 0 0 0 6 0 0 113 0 0 184 06:30 0 0 0 0 4 103 0 0 1 0 12 0 0 149 0 0 269 06:45 0 0 0 0 0 117 0 0 2 0 11 0 0 148 0 0 278 Total 0 0 0 0 6 339 0 0 4 0 36 0 0 503 0 0 888 07:00 0 0 0 0 2 138 0 0 3 0 10 0 0 110 4 0 267 07:15 0 0 0 0 3 172 0 0 6 0 11 0 0 120 3 0 315 07:30 0 0 0 0 2 204 0 0 4 0 9 0 0 109 3 0 331 07:45 0 0 0 0 10 197 0 0 7 0 20 0 0 88 2 0 324 Total 0 0 0 0 17 711 0 0 20 0 50 0 0 427 12 0 1237 08:00 0 0 0 0 9 212 0 0 8 0 11 0 0 101 2 0 343 08:15 0 0 0 0 9 201 0 0 7 0 5 0 0 101 4 0 327 08:30 0 0 0 0 3 181 0 0 11 0 8 0 0 122 5 0 330 08:45 0 0 0 0 4 166 0 0 3 0 6 0 0 121 5 0 305 Total 0 0 0 0 25 760 0 0 29 0 30 0 0 445 16 0 1305 09:00 0 0 0 0 12 168 0 0 5 0 9 0 0 111 4 0 309 09:15 0 0 0 0 4 143 0 0 3 0 8 0 0 97 5 0 260 09:30 0 0 0 0 4 169 0 0 3 0 11 0 0 125 2 0 314 09:45 0 0 0 0 5 137 0 0 4 0 4 0 0 119 3 0 272 Total 0 0 0 0 25 617 0 0 15 0 32 0 0 452 14 0 1155 10:00 0 0 0 0 6 156 0 0 3 0 16 0 0 128 3 0 312 10:15 0 0 0 0 10 162 0 0 2 0 11 0 0 153 3 0 341 10:30 0 0 0 0 5 134 0 0 4 0 5 0 0 142 2 0 292 10:45 0 0 0 0 4 150 0 0 1 0 8 0 0 156 4 0 323 Total 0 0 0 0 25 602 0 0 10 0 40 0 0 579 12 0 1268 11:00 0 0 0 0 14 147 0 0 4 0 16 0 0 128 3 0 312 11:15 0 0 0 0 9 168 0 0 0 0 10 0 0 157 3 0 347 11:30 0 0 0 0 6 156 0 0 6 0 10 0 0 160 3 2 343 11:45 0 0 0 0 12 166 0 0 3 0 10 0 0 160 2 0 353 Total 0 0 0 0 41 637 0 0 13 0 46 0 0 605 11 2 1355 12:00 0 0 0 0 16 176 0 0 3 0 13 0 0 174 7 0 389 12:15 0 0 0 0 19 189 0 0 6 0 11 0 0 143 4 0 372 12:30 0 0 0 0 10 150 0 0 2 0 10 0 0 173 7 2 354 12:45 0 0 0 0 13 167 0 0 6 0 10 0 0 187 5 3 391 Total 0 0 0 0 58 682 0 0 17 0 44 0 0 677 23 5 1506 13:00 0 0 0 0 14 179 0 0 4 0 6 0 0 150 3 0 356 13:15 0 0 0 0 15 165 0 0 0 0 9 0 0 141 4 0 334 13:30 0 0 0 0 5 155 0 0 4 0 11 0 0 161 5 0 341 13:45 0 0 0 0 10 182 0 0 2 0 15 0 0 146 6 0 361 Total 0 0 0 0 44 681 0 0 10 0 41 0 0 598 18 0 1392 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT File Name : Maybank Hwy @ St Johns Woods Pkwy Site Code : Start Date : 04/21/2026 Page No : 2 Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses Southbound Maybank Hwy Westbound St Johns Woods Pkwy Northbound Maybank Hwy Eastbound Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total 14:00 0 0 0 0 7 167 0 0 2 0 9 0 0 155 4 0 344 14:15 0 0 0 0 13 180 0 0 6 0 13 0 0 133 3 0 348 14:30 0 0 0 0 11 188 0 0 5 0 6 1 0 176 10 0 397 14:45 0 0 0 0 17 186 0 0 5 0 11 0 0 168 6 0 393 Total 0 0 0 0 48 721 0 0 18 0 39 1 0 632 23 0 1482 15:00 0 0 0 0 13 182 0 0 6 0 1 0 0 156 0 0 358 15:15 0 0 0 0 12 189 0 0 4 0 7 0 0 157 1 0 370 15:30 0 0 0 0 10 199 0 0 1 0 3 0 0 148 5 0 366 15:45 0 0 0 0 13 173 0 0 8 0 12 0 0 165 4 0 375 Total 0 0 0 0 48 743 0 0 19 0 23 0 0 626 10 0 1469 16:00 0 0 0 0 15 186 0 0 2 0 10 0 0 199 7 0 419 16:15 0 0 0 0 11 219 0 0 6 0 23 0 0 177 4 0 440 16:30 0 0 0 0 14 215 0 0 4 0 6 0 0 185 4 0 428 16:45 0 0 0 0 21 229 0 0 5 0 9 0 0 158 6 0 428 Total 0 0 0 0 61 849 0 0 17 0 48 0 0 719 21 0 1715 17:00 0 0 0 0 20 229 0 0 4 0 12 0 0 134 7 0 406 17:15 0 0 0 0 16 223 0 0 6 0 9 0 0 136 6 0 396 17:30 0 0 0 0 8 186 0 0 4 0 6 1 0 158 6 0 369 17:45 0 0 0 0 22 208 0 0 4 0 4 0 0 147 7 0 392 Total 0 0 0 0 66 846 0 0 18 0 31 1 0 575 26 0 1563 18:00 0 0 0 0 18 175 0 0 1 0 9 0 0 150 4 0 357 18:15 0 0 0 0 14 179 0 0 1 0 7 0 0 139 1 0 341 18:30 0 0 0 0 10 175 0 0 4 0 7 0 0 149 3 0 348 18:45 0 0 0 0 18 168 0 0 3 0 7 0 0 145 6 0 347 Total 0 0 0 0 60 697 0 0 9 0 30 0 0 583 14 0 1393 Grand Total 0 0 0 0 524 8885 0 0 199 0 490 2 0 7421 200 7 17728 Apprch % 0 0 0 0 5.6 94.4 0 0 28.8 0 70.9 0.3 0 97.3 2.6 0.1 Total % 0 0 0 0 3 50.1 0 0 1.1 0 2.8 0 0 41.9 1.1 0 Passenger Vehicles 0 0 0 0 515 8678 0 0 192 0 479 2 0 7239 195 7 17307 % Passenger Vehicles 0 0 0 0 98.3 97.7 0 0 96.5 0 97.8 100 0 97.5 97.5 100 97.6 Heavy Vehicles 0 0 0 0 9 169 0 0 7 0 7 0 0 156 4 0 352 % Heavy Vehicles 0 0 0 0 1.7 1.9 0 0 3.5 0 1.4 0 0 2.1 2 0 2 Buses 0 0 0 0 0 38 0 0 0 0 4 0 0 26 1 0 69 % Buses 0 0 0 0 0 0.4 0 0 0 0 0.8 0 0 0.4 0.5 0 0.4 735 Maryland St Columbia, SC 29201 We Can't say we're the Best, but you Can! DRAFT DRB Maybank Residential Development Traffic Impact Study Appendix E – Capacity Analysis Worksheets DRAFT DRB Maybank Residential Development Traffic Impact Study 2025 EXISTING CONDITIONS DRAFT HCM 7th TWSC 2025 Existing AM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 22.1 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 22 348 13 14 653 87 6 4 19 102 14 99 Future Vol, veh/h 22 348 13 14 653 87 6 4 19 102 14 99 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 5 4 2 2 4 2 2 2 2 2 2 2 Mvmt Flow 24 374 14 15 702 94 6 4 20 110 15 106 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 796 0 0 388 0 0 1168 1254 381 1203 1215 749 Stage 1 - - - - - - 428 428 - 779 779 - Stage 2 - - - - - - 740 826 - 424 435 - Critical Hdwy 4.15 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.245 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 813 - - 1170 - - 170 172 666 161 181 412 Stage 1 - - - - - - 605 584 - 389 406 - Stage 2 - - - - - - 409 387 - 608 580 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 813 - - 1170 - - 111 165 666 146 174 412 Mov Cap-2 Maneuver - - - - - - 111 165 - 146 174 - Stage 1 - - - - - - 587 567 - 384 401 - Stage 2 - - - - - - 288 382 - 568 563 - Approach EB WB NB SB HCM Control Delay, s/v 0.55 0.15 19.28 137.95 HCM LOS C F Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 128 666 813 - - 1170 - - 211 HCM Lane V/C Ratio 0.084 0.031 0.029 - - 0.013 - - 1.096 HCM Control Delay (s/veh) 35.8 10.6 9.6 - - 8.1 - - 138 HCM Lane LOS E B A - - A - - F HCM 95th %tile Q(veh) 0.3 0.1 0.1 - - 0 - - 10.7 DRAFT HCM 7th TWSC 2025 Existing AM Peak Hour 2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 451 18 32 732 22 50 Future Vol, veh/h 451 18 32 732 22 50 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 250 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 2 2 4 2 2 Mvmt Flow 490 20 35 796 24 54 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 510 0 1365 500 Stage 1 - - - - 500 - Stage 2 - - - - 865 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1055 - 162 571 Stage 1 - - - - 609 - Stage 2 - - - - 412 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1055 - 157 571 Mov Cap-2 Maneuver - - - - 287 - Stage 1 - - - - 609 - Stage 2 - - - - 399 - Approach EB WB NB HCM Control Delay, s/v 0 0.36 14.02 HCM LOS B Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 287 571 - - 1055 - HCM Lane V/C Ratio 0.083 0.095 - - 0.033 - HCM Control Delay (s/veh) 18.7 12 - - 8.5 - HCM Lane LOS C B - - A - HCM 95th %tile Q(veh) 0.3 0.3 - - 0.1 - DRAFT HCM 7th TWSC 2025 Existing AM Peak Hour 3: Maybank Highway & Fern Hill Drive DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 1 497 761 1 1 3 Future Vol, veh/h 1 497 761 1 1 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 3 2 2 2 Mvmt Flow 1 540 827 1 1 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 828 0 - 0 1370 828 Stage 1 - - - - 828 - Stage 2 - - - - 542 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 803 - - - 161 371 Stage 1 - - - - 429 - Stage 2 - - - - 583 - Platoon blocked, % - - - Mov Cap-1 Maneuver 803 - - - 161 371 Mov Cap-2 Maneuver - - - - 161 - Stage 1 - - - - 428 - Stage 2 - - - - 583 - Approach EB WB SB HCM Control Delay, s/v 0.02 0 18.07 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 4 - - - 280 HCM Lane V/C Ratio 0.001 - - - 0.016 HCM Control Delay (s/veh) 9.5 0 - - 18.1 HCM Lane LOS A A - - C HCM 95th %tile Q(veh) 0 - - - 0 DRAFT HCM 7th TWSC 2025 Existing PM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 26.8 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 127 629 22 17 675 188 11 1 22 51 9 57 Future Vol, veh/h 127 629 22 17 675 188 11 1 22 51 9 57 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 150 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 137 676 24 18 726 202 12 1 24 55 10 61 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 928 0 0 700 0 0 1728 1926 688 1813 1837 827 Stage 1 - - - - - - 961 961 - 863 863 - Stage 2 - - - - - - 767 965 - 950 973 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 737 - - 897 - - 69 67 446 61 76 372 Stage 1 - - - - - - 308 335 - 349 371 - Stage 2 - - - - - - 395 333 - 312 330 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 737 - - 897 - - 40 53 446 ~ 45 60 372 Mov Cap-2 Maneuver - - - - - - 40 53 - ~ 45 60 - Stage 1 - - - - - - 251 273 - 342 364 - Stage 2 - - - - - - 314 327 - 240 269 - Approach EB WB NB SB HCM Control Delay, s/v 1.79 0.18 54.23 $ 385.38 HCM LOS F F Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 41 446 737 - - 897 - - 81 HCM Lane V/C Ratio 0.315 0.053 0.185 - - 0.02 - - 1.544 HCM Control Delay (s/veh) 128.9 13.5 11 - - 9.1 - - $ 385.4 HCM Lane LOS F B B - - A - - F HCM 95th %tile Q(veh) 1.1 0.2 0.7 - - 0.1 - - 10.2 Notes ~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon DRAFT HCM 7th TWSC 2025 Existing PM Peak Hour 2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 1.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 684 18 60 859 21 51 Future Vol, veh/h 684 18 60 859 21 51 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 250 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 97 97 97 97 97 97 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 705 19 62 886 22 53 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 724 0 1724 714 Stage 1 - - - - 714 - Stage 2 - - - - 1009 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 879 - 98 431 Stage 1 - - - - 485 - Stage 2 - - - - 352 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 879 - 91 431 Mov Cap-2 Maneuver - - - - 218 - Stage 1 - - - - 485 - Stage 2 - - - - 327 - Approach EB WB NB HCM Control Delay, s/v 0 0.61 17.08 HCM LOS C Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 218 431 - - 879 - HCM Lane V/C Ratio 0.099 0.122 - - 0.07 - HCM Control Delay (s/veh) 23.3 14.5 - - 9.4 - HCM Lane LOS C B - - A - HCM 95th %tile Q(veh) 0.3 0.4 - - 0.2 - DRAFT HCM 7th TWSC 2025 Existing PM Peak Hour 3: Maybank Highway & Fern Hill Drive DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 713 916 4 1 3 Future Vol, veh/h 2 713 916 4 1 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 751 964 4 1 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 968 0 - 0 1721 966 Stage 1 - - - - 966 - Stage 2 - - - - 755 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 711 - - - 98 309 Stage 1 - - - - 369 - Stage 2 - - - - 464 - Platoon blocked, % - - - Mov Cap-1 Maneuver 711 - - - 98 309 Mov Cap-2 Maneuver - - - - 98 - Stage 1 - - - - 367 - Stage 2 - - - - 464 - Approach EB WB SB HCM Control Delay, s/v 0.03 0 23.34 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 5 - - - 200 HCM Lane V/C Ratio 0.003 - - - 0.021 HCM Control Delay (s/veh) 10.1 0 - - 23.3 HCM Lane LOS B A - - C HCM 95th %tile Q(veh) 0 - - - 0.1 DRAFT DRB Maybank Residential Development Traffic Impact Study 2028 NO-BUILD CONDITIONS DRAFT Queues 2028 No Build AM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Lane Group EBL EBT WBL WBT NBT NBR SBT Lane Group Flow (vph) 33 424 16 885 12 23 306 v/c Ratio 0.26 0.43 0.03 0.90 0.03 0.05 0.74 Control Delay (s/veh) 14.6 10.5 7.6 27.0 23.6 5.8 34.7 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 14.6 10.5 7.6 27.0 23.6 5.8 34.7 Queue Length 50th (ft) 7 94 3 293 4 0 102 Queue Length 95th (ft) 27 173 12 551 18 13 #255 Internal Link Dist (ft) 788 144 973 1748 Turn Bay Length (ft) 150 150 Base Capacity (vph) 185 1446 697 1429 567 632 589 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.18 0.29 0.02 0.62 0.02 0.04 0.52 Intersection Summary # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. DRAFT HCM 7th Signalized Intersection Summary 2028 No Build AM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 31 380 14 15 714 109 7 4 21 145 15 125 Future Volume (veh/h) 31 380 14 15 714 109 7 4 21 145 15 125 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1826 1841 1870 1870 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 33 409 15 16 768 117 8 4 23 156 16 134 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 5 4 2 2 4 2 2 2 2 2 2 2 Cap, veh/h 238 1078 40 570 953 145 258 114 367 238 28 152 Arrive On Green 0.61 0.61 0.61 0.61 0.61 0.61 0.23 0.23 0.23 0.23 0.23 0.23 Sat Flow, veh/h 613 1764 65 963 1560 238 774 493 1585 721 121 656 Grp Volume(v), veh/h 33 0 424 16 0 885 12 0 23 306 0 0 Grp Sat Flow(s),veh/h/ln 613 0 1829 963 0 1798 1267 0 1585 1498 0 0 Q Serve(g_s), s 3.3 0.0 8.9 0.7 0.0 28.7 0.0 0.0 0.9 14.1 0.0 0.0 Cycle Q Clear(g_c), s 32.0 0.0 8.9 9.6 0.0 28.7 0.4 0.0 0.9 15.0 0.0 0.0 Prop In Lane 1.00 0.04 1.00 0.13 0.67 1.00 0.51 0.44 Lane Grp Cap(c), veh/h 238 0 1118 570 0 1099 372 0 367 418 0 0 V/C Ratio(X) 0.14 0.00 0.38 0.03 0.00 0.81 0.03 0.00 0.06 0.73 0.00 0.00 Avail Cap(c_a), veh/h 298 0 1298 665 0 1276 489 0 500 543 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 23.6 0.0 7.5 9.9 0.0 11.3 22.6 0.0 22.8 28.2 0.0 0.0 Incr Delay (d2), s/veh 0.3 0.0 0.2 0.0 0.0 3.4 0.0 0.0 0.1 3.6 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.5 0.0 2.8 0.1 0.0 9.5 0.2 0.0 0.3 5.5 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 23.9 0.0 7.7 9.9 0.0 14.7 22.7 0.0 22.9 31.8 0.0 0.0 LnGrp LOS C A A B C C C Approach Vol, veh/h 457 901 35 306 Approach Delay, s/veh 8.9 14.6 22.8 31.8 Approach LOS A B C C Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 52.5 23.6 52.5 23.6 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 54.0 24.0 54.0 24.0 Max Q Clear Time (g_c+I1), s 34.0 2.9 30.7 17.0 Green Ext Time (p_c), s 6.5 0.1 15.8 0.6 Intersection Summary HCM 7th Control Delay, s/veh 16.3 HCM 7th LOS B DRAFT HCM 7th TWSC 2028 No Build AM Peak Hour 2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 527 20 35 814 24 55 Future Vol, veh/h 527 20 35 814 24 55 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 250 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 3 2 2 4 2 2 Mvmt Flow 573 22 38 885 26 60 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 595 0 1545 584 Stage 1 - - - - 584 - Stage 2 - - - - 961 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 982 - 126 512 Stage 1 - - - - 558 - Stage 2 - - - - 371 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 982 - 121 512 Mov Cap-2 Maneuver - - - - 250 - Stage 1 - - - - 558 - Stage 2 - - - - 357 - Approach EB WB NB HCM Control Delay, s/v 0 0.36 15.42 HCM LOS C Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 250 512 - - 982 - HCM Lane V/C Ratio 0.104 0.117 - - 0.039 - HCM Control Delay (s/veh) 21 13 - - 8.8 - HCM Lane LOS C B - - A - HCM 95th %tile Q(veh) 0.3 0.4 - - 0.1 - DRAFT HCM 7th TWSC 2028 No Build AM Peak Hour 3: Maybank Highway & Fern Hill Drive DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.3 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 35 543 846 1 1 3 Future Vol, veh/h 35 543 846 1 1 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 3 2 2 2 Mvmt Flow 38 590 920 1 1 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 921 0 - 0 1586 920 Stage 1 - - - - 920 - Stage 2 - - - - 666 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 742 - - - 119 328 Stage 1 - - - - 388 - Stage 2 - - - - 511 - Platoon blocked, % - - - Mov Cap-1 Maneuver 742 - - - 110 328 Mov Cap-2 Maneuver - - - - 110 - Stage 1 - - - - 359 - Stage 2 - - - - 511 - Approach EB WB SB HCM Control Delay, s/v 0.61 0 21.75 HCM LOS C Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 109 - - - 219 HCM Lane V/C Ratio 0.051 - - - 0.02 HCM Control Delay (s/veh) 10.1 0 - - 21.7 HCM Lane LOS B A - - C HCM 95th %tile Q(veh) 0.2 - - - 0.1 DRAFT Queues 2028 No Build PM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Lane Group EBL EBT WBL WBT NBT NBR SBT Lane Group Flow (vph) 167 765 20 1050 14 26 173 v/c Ratio 1.08 0.62 0.06 0.87 0.06 0.09 0.66 Control Delay (s/veh) 116.6 8.9 4.0 17.8 33.2 10.0 38.9 Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 Total Delay (s/veh) 116.6 8.9 4.0 17.8 33.2 10.0 38.9 Queue Length 50th (ft) ~79 162 3 298 5 0 49 Queue Length 95th (ft) #124 241 9 488 25 18 #178 Internal Link Dist (ft) 550 144 973 1748 Turn Bay Length (ft) 150 150 Base Capacity (vph) 208 1656 476 1608 245 312 293 Starvation Cap Reductn 0 0 0 0 0 0 0 Spillback Cap Reductn 0 0 0 0 0 0 0 Storage Cap Reductn 0 0 0 0 0 0 0 Reduced v/c Ratio 0.80 0.46 0.04 0.65 0.06 0.08 0.59 Intersection Summary ~ Volume exceeds capacity, queue is theoretically infinite. Queue shown is maximum after two cycles. # 95th percentile volume exceeds capacity, queue may be longer. Queue shown is maximum after two cycles. DRAFT HCM 7th Signalized Intersection Summary 2028 No Build PM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 155 687 24 19 738 238 12 1 24 78 10 73 Future Volume (veh/h) 155 687 24 19 738 238 12 1 24 78 10 73 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 167 739 26 20 794 256 13 1 26 84 11 78 Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 270 1315 46 463 992 320 219 14 211 148 23 91 Arrive On Green 0.73 0.73 0.73 0.73 0.73 0.73 0.13 0.13 0.13 0.13 0.13 0.13 Sat Flow, veh/h 537 1796 63 702 1355 437 1060 106 1585 662 170 683 Grp Volume(v), veh/h 167 0 765 20 0 1050 14 0 26 173 0 0 Grp Sat Flow(s),veh/h/ln 537 0 1859 702 0 1792 1166 0 1585 1514 0 0 Q Serve(g_s), s 26.0 0.0 16.7 1.2 0.0 33.8 0.0 0.0 1.3 8.9 0.0 0.0 Cycle Q Clear(g_c), s 59.8 0.0 16.7 17.9 0.0 33.8 0.9 0.0 1.3 9.9 0.0 0.0 Prop In Lane 1.00 0.03 1.00 0.24 0.93 1.00 0.49 0.45 Lane Grp Cap(c), veh/h 270 0 1361 463 0 1312 233 0 211 262 0 0 V/C Ratio(X) 0.62 0.00 0.56 0.04 0.00 0.80 0.06 0.00 0.12 0.66 0.00 0.00 Avail Cap(c_a), veh/h 275 0 1377 469 0 1327 235 0 213 264 0 0 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00 Uniform Delay (d), s/veh 27.1 0.0 5.4 9.5 0.0 7.7 33.8 0.0 34.0 37.7 0.0 0.0 Incr Delay (d2), s/veh 4.0 0.0 0.5 0.0 0.0 3.6 0.1 0.0 0.3 5.9 0.0 0.0 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 3.4 0.0 4.5 0.2 0.0 9.7 0.3 0.0 0.5 4.1 0.0 0.0 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 31.1 0.0 5.9 9.5 0.0 11.3 33.9 0.0 34.3 43.6 0.0 0.0 LnGrp LOS C A A B C C D Approach Vol, veh/h 932 1070 40 173 Approach Delay, s/veh 10.5 11.3 34.2 43.6 Approach LOS B B C D Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 71.2 17.9 71.2 17.9 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 66.0 12.0 66.0 12.0 Max Q Clear Time (g_c+I1), s 61.8 3.3 35.8 11.9 Green Ext Time (p_c), s 3.4 0.0 23.2 0.0 Intersection Summary HCM 7th Control Delay, s/veh 13.9 HCM 7th LOS B DRAFT HCM 7th TWSC 2028 No Build PM Peak Hour 2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 1.2 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 769 20 66 972 23 56 Future Vol, veh/h 769 20 66 972 23 56 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - 250 - 0 0 Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 809 21 69 1023 24 59 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 831 0 1982 820 Stage 1 - - - - 820 - Stage 2 - - - - 1162 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 802 - 68 375 Stage 1 - - - - 433 - Stage 2 - - - - 298 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 802 - 62 375 Mov Cap-2 Maneuver - - - - 179 - Stage 1 - - - - 433 - Stage 2 - - - - 272 - Approach EB WB NB HCM Control Delay, s/v 0 0.63 19.84 HCM LOS C Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT Capacity (veh/h) 179 375 - - 802 - HCM Lane V/C Ratio 0.135 0.157 - - 0.087 - HCM Control Delay (s/veh) 28.3 16.4 - - 9.9 - HCM Lane LOS D C - - A - HCM 95th %tile Q(veh) 0.5 0.6 - - 0.3 - DRAFT HCM 7th TWSC 2028 No Build PM Peak Hour 3: Maybank Highway & Fern Hill Drive DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.1 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 801 1034 4 1 3 Future Vol, veh/h 2 801 1034 4 1 3 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 843 1088 4 1 3 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1093 0 - 0 1938 1091 Stage 1 - - - - 1091 - Stage 2 - - - - 847 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 639 - - - 72 261 Stage 1 - - - - 322 - Stage 2 - - - - 420 - Platoon blocked, % - - - Mov Cap-1 Maneuver 639 - - - 72 261 Mov Cap-2 Maneuver - - - - 72 - Stage 1 - - - - 320 - Stage 2 - - - - 420 - Approach EB WB SB HCM Control Delay, s/v 0.03 0 28.54 HCM LOS D Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 4 - - - 157 HCM Lane V/C Ratio 0.003 - - - 0.027 HCM Control Delay (s/veh) 10.7 0 - - 28.5 HCM Lane LOS B A - - D HCM 95th %tile Q(veh) 0 - - - 0.1 DRAFT DRB Maybank Residential Development Traffic Impact Study 2028 BUILD CONDITIONS DRAFT HCM 7th TWSC 2028 Build AM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 1.2 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 2 412 14 29 837 9 7 4 21 11 1 10 Future Vol, veh/h 2 412 14 29 837 9 7 4 21 11 1 10 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 50 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 5 4 2 2 4 2 2 2 2 2 2 2 Mvmt Flow 2 443 15 31 900 10 8 4 23 12 1 11 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 910 0 0 458 0 0 1418 1427 451 1417 1430 905 Stage 1 - - - - - - 455 455 - 967 967 - Stage 2 - - - - - - 963 972 - 449 462 - Critical Hdwy 4.15 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.245 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 736 - - 1103 - - 115 135 609 115 135 335 Stage 1 - - - - - - 585 569 - 306 332 - Stage 2 - - - - - - 307 331 - 589 564 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 736 - - 1103 - - 107 131 609 104 130 335 Mov Cap-2 Maneuver - - - - - - 107 131 - 104 130 - Stage 1 - - - - - - 583 567 - 297 323 - Stage 2 - - - - - - 288 321 - 561 563 - Approach EB WB NB SB HCM Ctrl Dly, s/v 0.05 0.28 21.1 32.76 HCM LOS C D Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 114 609 736 - - 1103 - - 153 HCM Lane V/C Ratio 0.103 0.037 0.003 - - 0.028 - - 0.154 HCM Ctrl Dly (s/v) 40.1 11.1 9.9 - - 8.4 - - 32.8 HCM Lane LOS E B A - - A - - D HCM 95th %tile Q(veh) 0.3 0.1 0 - - 0.1 - - 0.5 DRAFT HCM 7th Signalized Intersection Summary 2028 Build AM Peak Hour 2: St. Johns Woods Parkway/Project Driveway #1 & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 32 461 20 35 717 103 24 0 55 147 0 134 Future Volume (veh/h) 32 461 20 35 717 103 24 0 55 147 0 134 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1856 1870 1870 1841 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 35 501 22 38 779 112 26 0 60 160 0 146 Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 Percent Heavy Veh, % 2 3 2 2 4 2 2 2 2 2 2 2 Cap, veh/h 353 1228 54 610 1096 158 104 0 206 233 0 206 Arrive On Green 0.70 0.70 0.70 0.70 0.70 0.70 0.13 0.00 0.13 0.13 0.00 0.13 Sat Flow, veh/h 624 1764 77 879 1574 226 1242 0 1585 990 0 1585 Grp Volume(v), veh/h 35 0 523 38 0 891 26 0 60 160 0 146 Grp Sat Flow(s),veh/h/ln 624 0 1842 879 0 1800 1242 0 1585 990 0 1585 Q Serve(g_s), s 2.5 0.0 8.3 1.3 0.0 20.6 0.0 0.0 2.4 6.6 0.0 6.1 Cycle Q Clear(g_c), s 23.1 0.0 8.3 9.7 0.0 20.6 9.0 0.0 2.4 9.0 0.0 6.1 Prop In Lane 1.00 0.04 1.00 0.13 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 353 0 1282 610 0 1253 104 0 206 233 0 206 V/C Ratio(X) 0.10 0.00 0.41 0.06 0.00 0.71 0.25 0.00 0.29 0.69 0.00 0.71 Avail Cap(c_a), veh/h 541 0 1839 876 0 1797 104 0 206 233 0 206 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 13.3 0.0 4.5 6.5 0.0 6.3 34.6 0.0 27.2 31.9 0.0 28.8 Incr Delay (d2), s/veh 0.1 0.0 0.2 0.0 0.0 0.8 1.2 0.0 0.8 8.1 0.0 10.6 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 0.3 0.0 1.9 0.2 0.0 4.7 0.5 0.0 0.9 3.1 0.0 2.8 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 13.4 0.0 4.7 6.5 0.0 7.1 35.8 0.0 27.9 40.0 0.0 39.3 LnGrp LOS B A A A D C D D Approach Vol, veh/h 558 929 86 306 Approach Delay, s/veh 5.2 7.1 30.3 39.7 Approach LOS A A C D Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 54.1 15.0 54.1 15.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 69.0 9.0 69.0 9.0 Max Q Clear Time (g_c+I1), s 25.1 11.0 22.6 11.0 Green Ext Time (p_c), s 11.7 0.0 25.5 0.0 Intersection Summary HCM 7th Control Delay, s/veh 12.9 HCM 7th LOS B DRAFT HCM 7th TWSC 2028 Build AM Peak Hour 3: Maybank Highway & Fern Hill Drive DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.4 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 35 556 848 5 4 7 Future Vol, veh/h 35 556 848 5 4 7 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 92 92 92 92 92 92 Heavy Vehicles, % 2 2 3 2 2 2 Mvmt Flow 38 604 922 5 4 8 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 927 0 - 0 1605 924 Stage 1 - - - - 924 - Stage 2 - - - - 680 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 737 - - - 116 326 Stage 1 - - - - 386 - Stage 2 - - - - 503 - Platoon blocked, % - - - Mov Cap-1 Maneuver 737 - - - 107 326 Mov Cap-2 Maneuver - - - - 107 - Stage 1 - - - - 356 - Stage 2 - - - - 503 - Approach EB WB SB HCM Ctrl Dly, s/v 0.6 0 25.58 HCM LOS D Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 107 - - - 187 HCM Lane V/C Ratio 0.052 - - - 0.064 HCM Ctrl Dly (s/v) 10.1 0 - - 25.6 HCM Lane LOS B A - - D HCM 95th %tile Q(veh) 0.2 - - - 0.2 DRAFT HCM 7th TWSC 2028 Build AM Peak Hour 4: Fern Hill Drive & Cross Island Extension DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 5.1 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 7 4 2 4 0 Future Vol, veh/h 0 7 4 2 4 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 8 4 2 4 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 16 4 4 0 - 0 Stage 1 4 - - - - - Stage 2 11 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 1003 1079 1617 - - - Stage 1 1019 - - - - - Stage 2 1012 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 1000 1079 1617 - - - Mov Cap-2 Maneuver 1000 - - - - - Stage 1 1016 - - - - - Stage 2 1012 - - - - - Approach EB NB SB HCM Ctrl Dly, s/v 8.36 4.82 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1200 - 1079 - - HCM Lane V/C Ratio 0.003 - 0.007 - - HCM Ctrl Dly (s/v) 7.2 0 8.4 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - DRAFT HCM 7th TWSC 2028 Build AM Peak Hour 5: Project Driveway #1 & Cross Island Extension DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 3.1 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 2 264 10 7 110 2 Future Vol, veh/h 2 264 10 7 110 2 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 293 11 8 122 2 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 296 0 179 149 Stage 1 - - - - 149 - Stage 2 - - - - 30 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1266 - 811 898 Stage 1 - - - - 879 - Stage 2 - - - - 993 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1266 - 804 898 Mov Cap-2 Maneuver - - - - 804 - Stage 1 - - - - 879 - Stage 2 - - - - 984 - Approach EB WB NB HCM Ctrl Dly, s/v 0 4.63 10.29 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 805 - - 1059 - HCM Lane V/C Ratio 0.155 - - 0.009 - HCM Ctrl Dly (s/v) 10.3 - - 7.9 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 0.5 - - 0 - DRAFT HCM 7th TWSC 2028 Build AM Peak Hour 6: Southwick Drive & Cross Island Extension DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.4 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 266 22 0 117 15 0 Future Vol, veh/h 266 22 0 117 15 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 296 24 0 130 17 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 320 0 438 308 Stage 1 - - - - 308 - Stage 2 - - - - 130 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1240 - 576 732 Stage 1 - - - - 745 - Stage 2 - - - - 896 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1240 - 576 732 Mov Cap-2 Maneuver - - - - 576 - Stage 1 - - - - 745 - Stage 2 - - - - 896 - Approach EB WB NB HCM Ctrl Dly, s/v 0 0 11.43 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 576 - - 1240 - HCM Lane V/C Ratio 0.029 - - - - HCM Ctrl Dly (s/v) 11.4 - - 0 - HCM Lane LOS B - - A - HCM 95th %tile Q(veh) 0.1 - - 0 - DRAFT HCM 7th TWSC 2028 Build PM Peak Hour 1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 1.6 Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Vol, veh/h 14 837 24 28 811 19 12 1 24 6 1 6 Future Vol, veh/h 14 837 24 28 811 19 12 1 24 6 1 6 Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0 Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop RT Channelized - - None - - None - - None - - None Storage Length 150 - - 50 - - - - 0 - - - Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 - Grade, % - 0 - - 0 - - 0 - - 0 - Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93 Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2 Mvmt Flow 15 900 26 30 872 20 13 1 26 6 1 6 Major/Minor Major1 Major2 Minor1 Minor2 Conflicting Flow All 892 0 0 926 0 0 1876 1896 913 1873 1898 882 Stage 1 - - - - - - 943 943 - 942 942 - Stage 2 - - - - - - 933 953 - 931 956 - Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22 Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 - Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 - Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318 Pot Cap-1 Maneuver 760 - - 738 - - 55 70 331 55 69 345 Stage 1 - - - - - - 315 341 - 315 341 - Stage 2 - - - - - - 319 338 - 320 337 - Platoon blocked, % - - - - Mov Cap-1 Maneuver 760 - - 738 - - 50 65 331 47 65 345 Mov Cap-2 Maneuver - - - - - - 50 65 - 47 65 - Stage 1 - - - - - - 309 334 - 303 327 - Stage 2 - - - - - - 300 324 - 289 330 - Approach EB WB NB SB HCM Ctrl Dly, s/v 0.16 0.33 46.51 58.6 HCM LOS E F Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1 Capacity (veh/h) 51 331 760 - - 738 - - 81 HCM Lane V/C Ratio 0.276 0.078 0.02 - - 0.041 - - 0.173 HCM Ctrl Dly (s/v) 101.4 16.8 9.8 - - 10.1 - - 58.6 HCM Lane LOS F C A - - B - - F HCM 95th %tile Q(veh) 0.9 0.3 0.1 - - 0.1 - - 0.6 DRAFT HCM 7th Signalized Intersection Summary 2028 Build PM Peak Hour 2: St. Johns Woods Parkway/Project Driveway #1 & Maybank Highway DRB Maybank TIA Kimley-Horn Synchro 12 Report Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR Lane Configurations Traffic Volume (veh/h) 150 697 20 66 756 226 23 0 56 81 0 79 Future Volume (veh/h) 150 697 20 66 756 226 23 0 56 81 0 79 Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0 Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Work Zone On Approach No No No No Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 Adj Flow Rate, veh/h 158 734 21 69 796 238 24 0 59 85 0 83 Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2 Cap, veh/h 310 1357 39 496 1037 310 99 0 170 183 0 170 Arrive On Green 0.75 0.75 0.75 0.75 0.75 0.75 0.11 0.00 0.11 0.11 0.00 0.11 Sat Flow, veh/h 546 1809 52 709 1383 413 1315 0 1585 911 0 1585 Grp Volume(v), veh/h 158 0 755 69 0 1034 24 0 59 85 0 83 Grp Sat Flow(s),veh/h/ln 546 0 1861 709 0 1796 1315 0 1585 911 0 1585 Q Serve(g_s), s 20.2 0.0 14.3 3.8 0.0 28.5 0.8 0.0 2.9 5.3 0.0 4.1 Cycle Q Clear(g_c), s 48.7 0.0 14.3 18.1 0.0 28.5 9.0 0.0 2.9 8.2 0.0 4.1 Prop In Lane 1.00 0.03 1.00 0.23 1.00 1.00 1.00 1.00 Lane Grp Cap(c), veh/h 310 0 1396 496 0 1347 99 0 170 183 0 170 V/C Ratio(X) 0.51 0.00 0.54 0.14 0.00 0.77 0.24 0.00 0.35 0.46 0.00 0.49 Avail Cap(c_a), veh/h 349 0 1528 547 0 1475 99 0 170 183 0 170 HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 Uniform Delay (d), s/veh 20.5 0.0 4.4 8.2 0.0 6.2 41.8 0.0 34.8 38.6 0.0 35.3 Incr Delay (d2), s/veh 1.3 0.0 0.3 0.1 0.0 2.3 1.3 0.0 1.2 1.8 0.0 2.2 Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 %ile BackOfQ(50%),veh/ln 2.4 0.0 3.3 0.5 0.0 6.9 0.5 0.0 1.2 1.8 0.0 1.7 Unsig. Movement Delay, s/veh LnGrp Delay(d), s/veh 21.8 0.0 4.7 8.4 0.0 8.5 43.0 0.0 36.0 40.4 0.0 37.5 LnGrp LOS C A A A D D D D Approach Vol, veh/h 913 1103 83 168 Approach Delay, s/veh 7.7 8.5 38.0 39.0 Approach LOS A A D D Timer - Assigned Phs 2 4 6 8 Phs Duration (G+Y+Rc), s 69.0 15.0 69.0 15.0 Change Period (Y+Rc), s 6.0 6.0 6.0 6.0 Max Green Setting (Gmax), s 69.0 9.0 69.0 9.0 Max Q Clear Time (g_c+I1), s 50.7 11.0 30.5 10.2 Green Ext Time (p_c), s 12.3 0.0 28.0 0.0 Intersection Summary HCM 7th Control Delay, s/veh 11.5 HCM 7th LOS B DRAFT HCM 7th TWSC 2028 Build PM Peak Hour 3: Maybank Highway & Fern Hill Drive DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.2 Movement EBL EBT WBT WBR SBL SBR Lane Configurations Traffic Vol, veh/h 2 810 1041 15 3 6 Future Vol, veh/h 2 810 1041 15 3 6 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # - 0 0 - 0 - Grade, % - 0 0 - 0 - Peak Hour Factor 95 95 95 95 95 95 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 2 853 1096 16 3 6 Major/Minor Major1 Major2 Minor2 Conflicting Flow All 1112 0 - 0 1961 1104 Stage 1 - - - - 1104 - Stage 2 - - - - 857 - Critical Hdwy 4.12 - - - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy 2.218 - - - 3.518 3.318 Pot Cap-1 Maneuver 628 - - - 70 257 Stage 1 - - - - 317 - Stage 2 - - - - 416 - Platoon blocked, % - - - Mov Cap-1 Maneuver 628 - - - 69 257 Mov Cap-2 Maneuver - - - - 69 - Stage 1 - - - - 315 - Stage 2 - - - - 416 - Approach EB WB SB HCM Ctrl Dly, s/v 0.03 0 33.68 HCM LOS D Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1 Capacity (veh/h) 4 - - - 135 HCM Lane V/C Ratio 0.003 - - - 0.07 HCM Ctrl Dly (s/v) 10.7 0 - - 33.7 HCM Lane LOS B A - - D HCM 95th %tile Q(veh) 0 - - - 0.2 DRAFT HCM 7th TWSC 2028 Build PM Peak Hour 4: Fern Hill Drive & Cross Island Extension DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 4.5 Movement EBL EBR NBL NBT SBT SBR Lane Configurations Traffic Vol, veh/h 0 5 11 7 4 0 Future Vol, veh/h 0 5 11 7 4 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Stop Stop Free Free Free Free RT Channelized - None - None - None Storage Length 0 - - - - - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 0 6 12 8 4 0 Major/Minor Minor2 Major1 Major2 Conflicting Flow All 37 4 4 0 - 0 Stage 1 4 - - - - - Stage 2 32 - - - - - Critical Hdwy 6.42 6.22 4.12 - - - Critical Hdwy Stg 1 5.42 - - - - - Critical Hdwy Stg 2 5.42 - - - - - Follow-up Hdwy 3.518 3.318 2.218 - - - Pot Cap-1 Maneuver 976 1079 1617 - - - Stage 1 1019 - - - - - Stage 2 990 - - - - - Platoon blocked, % - - - Mov Cap-1 Maneuver 968 1079 1617 - - - Mov Cap-2 Maneuver 968 - - - - - Stage 1 1011 - - - - - Stage 2 990 - - - - - Approach EB NB SB HCM Ctrl Dly, s/v 8.35 4.43 0 HCM LOS A Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR Capacity (veh/h) 1100 - 1079 - - HCM Lane V/C Ratio 0.008 - 0.005 - - HCM Ctrl Dly (s/v) 7.2 0 8.4 - - HCM Lane LOS A A A - - HCM 95th %tile Q(veh) 0 - 0 - - DRAFT HCM 7th TWSC 2028 Build PM Peak Hour 5: Project Driveway #1 & Cross Island Extension DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 7.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 7 150 7 5 312 5 Future Vol, veh/h 7 150 7 5 312 5 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 8 167 8 6 347 6 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 174 0 112 91 Stage 1 - - - - 91 - Stage 2 - - - - 21 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1402 - 884 966 Stage 1 - - - - 932 - Stage 2 - - - - 1002 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1402 - 880 966 Mov Cap-2 Maneuver - - - - 880 - Stage 1 - - - - 932 - Stage 2 - - - - 996 - Approach EB WB NB HCM Ctrl Dly, s/v 0 4.42 11.78 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 881 - - 1050 - HCM Lane V/C Ratio 0.4 - - 0.006 - HCM Ctrl Dly (s/v) 11.8 - - 7.6 0 HCM Lane LOS B - - A A HCM 95th %tile Q(veh) 1.9 - - 0 - DRAFT HCM 7th TWSC 2028 Build PM Peak Hour 6: Southwick Drive & Cross Island Extension DRB Maybank TIA Kimley-Horn Synchro 12 Report Intersection Int Delay, s/veh 0.8 Movement EBT EBR WBL WBT NBL NBR Lane Configurations Traffic Vol, veh/h 157 13 0 317 34 0 Future Vol, veh/h 157 13 0 317 34 0 Conflicting Peds, #/hr 0 0 0 0 0 0 Sign Control Free Free Free Free Stop Stop RT Channelized - None - None - None Storage Length - - - - 0 - Veh in Median Storage, # 0 - - 0 0 - Grade, % 0 - - 0 0 - Peak Hour Factor 90 90 90 90 90 90 Heavy Vehicles, % 2 2 2 2 2 2 Mvmt Flow 174 14 0 352 38 0 Major/Minor Major1 Major2 Minor1 Conflicting Flow All 0 0 189 0 534 182 Stage 1 - - - - 182 - Stage 2 - - - - 352 - Critical Hdwy - - 4.12 - 6.42 6.22 Critical Hdwy Stg 1 - - - - 5.42 - Critical Hdwy Stg 2 - - - - 5.42 - Follow-up Hdwy - - 2.218 - 3.518 3.318 Pot Cap-1 Maneuver - - 1385 - 507 861 Stage 1 - - - - 850 - Stage 2 - - - - 712 - Platoon blocked, % - - - Mov Cap-1 Maneuver - - 1385 - 507 861 Mov Cap-2 Maneuver - - - - 507 - Stage 1 - - - - 850 - Stage 2 - - - - 712 - Approach EB WB NB HCM Ctrl Dly, s/v 0 0 12.67 HCM LOS B Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT Capacity (veh/h) 507 - - 1385 - HCM Lane V/C Ratio 0.075 - - - - HCM Ctrl Dly (s/v) 12.7 - - 0 - HCM Lane LOS B - - A - HCM 95th %tile Q(veh) 0.2 - - 0 - DRAFT DRAWING No. SHEET No. REVISIONS DRAWN BYDATE DESIGNED BY REVIEWED BY DATE DATE DATE 363 Wando Place Drive Suite 200 Mt. Pleasant, SC 29464 Phone (843) 971-8520 Fax (843) 971-8522 J:\South Carolina\2024\SC-24esa4324\GIS\2025\Delineation_Supplement_031325\Delineation_Supplement_031325.aprx 4/4/2025 1:49 PM CalebO 5 5 5 5 5 5 5 5 5 5 5 55 5 5 5 5 5 5 5 TRIBUTARY 1 (0.04 Ac.±) (510 Lf.±) WETLAND 2 (0.13 Ac.±) WETLAND 3 (0.20 Ac.±) WETLAND 1 (0.88 Ac.±) UPLAND (1.13 Ac.±) UPLAND (3.99 Ac.±) POND 1 (0.10 Ac.±) UPLAND (7.02 Ac.±) ¿À700 SALVO LNSALVO LN FERN HILL DRFERN HILL DR1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 LEGEND MAYBANK AT FERNHILL WETLAND POND TRIBUTARY SC-24ESA4324 EXHIBIT 7 MAYBANK AT FERNHILL AERIAL WITH BOUNDARY COORDINATES AND FEATURES 3/13/25S.R. 3/13/25S.R. 3/13/25C.O. 0 100 200 Feet ¶ NOTES: AERIAL PHOTOGRAPHS WERE ACQUIRED FROM THE SOUTH CAROLINA REVENUE AND FISCAL AFFAIRS OFFICE WITH FLIGHT DATES OF JANUARY THROUGH FEBRUARY 2023. PROPERTY BOUNDARY ESTIMATED FROM THE CHARLESTON COUNTY GIS WEBSITE. UPLAND/WETLAND LIMITS HAVE NOT BEEN REVIEWED BY ANY REGULATORY AGENCY AND ARE SUBJECT TO CHANGE. PROJECT LOCATION Map No. Latitude Longitude 1 32.732962 -80.067394 2 32.733299 -80.066734 3 32.733126 -80.066608 4 32.733713 -80.066286 5 32.733875 -80.066006 6 32.734135 -80.065279 7 32.733592 -80.064972 8 32.733981 -80.064497 9 32.733818 -80.064392 10 32.733567 -80.064179 11 32.733425 -80.064028 12 32.733129 -80.064608 13 32.733076 -80.064563 14 32.732407 -80.065849 15 32.730111 -80.064159 16 32.729817 -80.06471 17 32.731983 -80.066346 18 32.731899 -80.066508 19 32.732015 -80.066594 20 32.731936 -80.066745 % OF TYPE ACREAGE LINEAR FEET TOTAL POND 0.10 Ac.± - 0.7% TRIBUTARY 0.04 Ac.± - 0.3% UPLAND 12.14 Ac.± - 90.0% WETLAND 1.21 Ac.± 510 Lf.± 9.0% TOTAL 13.49 Ac.± 510 Lf.± 100.0% PROJECT ACREAGE TABLE

Source: City of Charleston website. First collected Oct 23, 2026.