Planning Commission: Maybank PUD
City of Charleston · Berkeley County · meeting of Oct 21, 2026 · Agendas
Open the original document More from City of Charleston
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
PAGE 1
MAYBANK PUD AUGUST 2026
DEVELOPMENT GUIDELINES FOR THE DEVELOPMENT GUIDELINES FOR THE
Maybank PUDMaybank PUD
ID#: PUD2026-000033ID#: PUD2026-000033
CHARLESTON, SOUTH CAROLINACHARLESTON, SOUTH CAROLINA
MAYBANK PUD
PAGE 2
AUGUST 2026
4 Section 1 - Relationship to Zoning Ordinance of the City of
Charleston
5 Section 2 - Introduction
5 2.01 Project Location
5 2.02 TMS # / Current Zoning / Property Owner / Total Area
6 2.03 Background Information
6 2.04 Development Summary
6 2.05 Goals for the Project
7 Section 3 - Land Use
7 3.01 Area Breakdown
7 3.02 Net Density
7 3.03 Development Pods
7 Section 4 - Zoning Criteria
7 4.01 Commercial District (CD)
10 4.02 Residential District (RD)
11 Section 5 - Open Space
11 5.01 Total Open Space Area
11 5.02 Total Usable Open Space
12 5.03 Conceptual Plan for Open Space
12 5.04 Ownership and Maintenance of Open Space
12 5.05 Open Space Definitions from the City of Charleston Zoning Ordinance
13 Section 6 - Buffers
13 6.02 Maybank Highway Buffer
14 6.03 Fern Hill Drive Buffer
14 6.04 Ownership and Maintenance
14 Section 7 - Tree Summary
14 7.01 Summary of Existing Trees
14 7.02 Tree Protection Standards
Table of Contents
PAGE 3
MAYBANK PUD AUGUST 2026
15 Section 8 - Right-of-Way
15 8.01 Road Ownership
15 8.02 Dimensions
15 8.03 Sidewalks
15 8.04 Street Lights / Street Trees
15 8.05 Emergency/Public Service Access
16 Section 9 - Drainage Basin Analysis
16 9.01 Flood zone
16 9.02 Topography
16 9.03 Wetland Verification
16 9.04 Preliminary Stormwater Techniques
16 Section 10 - Traffic Study
16 10.01 Traffic Study (Provided Under Separate Cover)
17 Section 11 - Cultural Resources
17 11.01 Information Resource and Findings
17 Section 12 - Letters of Coordination
17 12.01 Service Providers
18 Section 13 - Additional Development Criteria
18 13.01 Signage
18 13.02 Phasing
18 13.03 Design Review Board
19 Exhibits
MAYBANK PUD
PAGE 4
AUGUST 2026
Development Guidelines
Maybank Planned Unit Development
Charleston, South Carolina (City of Charleston)
Section 1 - Relationship to Zoning Ordinance of the City of Charleston
Relationship to the Zoning Ordinance
The Development Guidelines and Land Use Plan for the Maybank Planned Unit Development
(PUD), attached hereto and made a part of hereof, are part of the PUD conditional use
Master Plan application submitted in accordance with the Zoning Ordinance of the City
of Charleston, Article 2, Part 7 Sections 54-250, et seq. The Zoning Ordinance of the City of
Charleston is incorporated herein by reference, except as amended herein.
The Zoning Ordinance of the City of Charleston (“Zoning Ordinance”) is incorporated by
reference, except as amended by these development guidelines (“Guidelines”). No person
shall erect or alter any building, structure, or sign on any tract of land or use any tract of
land within the Maybank PUD (“the PUD”) except in conformance with these guidelines
and regulations. Unless modified herein, definitions of terms used in the Maybank PUD
Development Guidelines shall follow definitions listed in the Zoning Ordinance of the City of
Charleston, as amended from time to time. Administration and enforcement of the Maybank
PUD Master Plan shall follow Article 9 of the Zoning Ordinance of the City of Charleston.
The Maybank PUD Master Plan was approved by Charleston City Council on
Ordinance Number
PAGE 5
MAYBANK PUD AUGUST 2026
Section 2 - Introduction
LOCATION MAP - NOT TO SCALE
2.01 Project Location
The PUD site is located in the City of Charleston, South Carolina on Johns Island off of
Maybank Highway between Fern Hill Drive and Southwick Drive. The project is made up of
seven parcels; two of the seven parcels exists in Charleston County and will be annexed into
the City of Charleston as a requirement of this PUD.
2.02 TMS # / Current Zoning / Property Owner / Total Area
PARCEL INFORMATION
TMS #’S CURRENT ZONING OWNER TOTAL
ACREAGE
279-00-00-006
(Charleston
County)
Overlay District Bright Oak Properties LLC 2.29 AC
279-00-00-288 CT (Commercial
Transitional) Charleston Real Estate, Company LP 0.52 AC
279-00-00-008 CT (Commercial
Transitional) Charleston Real Estate, Company LP 2.30 AC
279-00-00-009 CT (Commercial
Transitional) Charleston Real Estate, Company LP 1.72 AC
279-00-00-017 SR-1 (Single-Family
Residential 1) Fenwick Hills Corp 2.48 AC
313-00-00-047 RR-1 (Rural Residential 1) Bailey Dennis R, Bailey Sherry B 5.89 AC
313-00-00-237
(Charleston
County)
R-4 (Low Density
Residential District) Rosemary Lynn Knox 0.41 AC
Total Acreage: 15.61 AC
MAYBANK PUD
PAGE 6
AUGUST 2026
2.03 Background Information
The site consists of seven parcels, most of which are undeveloped. However, two parcels
have been developed to different degrees. Parcel 279-00-00-006 is the property with Bright
Oak Preschool Academy which is a daycare facility in operation. Parcel 313-00-00-047 has
a two story home on it, which will not remain, and a gravel drive. Five of the parcels are
located within the City of Charleston, and two will be annexed from Charleston County.
This PUD is structured to align with the City of Charleston’s planning objectives by integrating
a context-sensitive approach that respects the natural character of Johns Island. The
development incorporates appropriate residential density, substantial landscape buffering,
and a complementary mix of residential and commercial uses to support a walkable, mixed-
use community. The development’s urban form and architectural character are intended
to reflect the qualities of a traditional neighborhood, while preserving key environmental
features of the site. A connected street network is proposed to bisect Maybank Highway,
enhancing multimodal connectivity and supporting the long-term mobility goals for the area.
2.04 Development Summary
The Maybank PUD proposes two land use districts: the Commercial District (CD) and the
Residential District (RD). Potential future development will follow the criteria outlined in this
PUD.
This PUD aligns with the Charleston City Plan and future land use designations, supporting a
mix of housing types. The proposed land uses are consistent with the area’s suburban and
neighborhood edge classifications.
2.05 Goals for the Project
This PUD is designed to advance the goals of the Charleston City Plan, particularly its
emphasis on creating a connected, inclusive, and resilient community. The development
supports a mix of housing types that align with the City’s future land use designations and
housing affordability strategies. In keeping with the Resilience and Equity Framework of the
City Plan, the PUD promotes equitable access to housing, transportation, and green space,
while preserving the natural character of Johns Island within the Urban Growth Boundary.
Connectivity is a central feature of the PUD, reflecting the priorities of the Johns Island
Community Plan and the Citywide Transportation Plan. The alignment of a newly proposed
road with St. Johns Woods Parkway and the addition of a traffic signal will create a critical
east-west connection, improving circulation and reducing pressure on Maybank Highway.
The internal street network is designed to support multimodal access, with pedestrian
pathways that link to surrounding neighborhoods and future transit corridors, consistent with
the People Pedal Plan and the proposed Five Lakes Trail of the Johns Island Community
Greenways Plan which runs parallel to Maybank Highway and connects the Whitney Lake
subdivision with Johns Island Park.
The Commercial District will unify the Bright Oak Preschool Academy property, with a
residential neighborhood. This supports the City Plan’s call to strengthen local institutions
PAGE 7
MAYBANK PUD AUGUST 2026
and ensure long-term community benefit. The PUD emphasizes environmental stewardship
through use of native vegetation. These efforts reflect a shared commitment to climate
resilience, ecological health, and sustainable growth—values that align with the City’s long-
term vision for a thriving, balanced community.
Section 3 - Land Use
3.01 Area Breakdown
The proposed development will contain commercial uses and residential uses. This PUD will
categorize the development into two districts; Commercial District (CD) and Residential
District (RD).
Note:
Acreages are based on the plats included in the appendix of this document.
3.02 Net Density
3.03 Development Pods
Commercial District (CD):
The Commercial District shall adhere to the City of Charleston’s Zoning Ordinance; Article 3,
Part 1 for General Business Non-Residential except as stated otherwise within this document.
Residential District (RD):
The Residential District shall adhere to the City of Charleston’s Zoning Ordinance; Article
3, Part 1 - GB Residential for Single-family detached development except as otherwise
stated in this document. Attached residential shall adhere to the City of Charleston’s Zoning
Ordinance Article 3, Part 11 - One-Family Attached Dwelling - Section 54-353 except as
stated otherwise in this document.
Section 4 - Zoning Criteria
4.01 Commercial District (CD)
A. Land Uses:
The Commercial District development area allows General Business (GB) land
uses as set within the City of Charleston’s Zoning Ordinance Article 2, Part 3 -
Table of Permitted Uses.
LAND USE TOTAL ACREAGE HIGHLAND ACREAGE WETLAND ACREAGE
Commercial 2.29 1.90 0.39
Residential 13.32 11.97 1.35
GROSS ACRES NET ACRES
(HIGHLAND)
MAXIMUM DWELLING UNITS
ALLOWED NET DENSITY
15.61 13.87 69 DU 5 DU/AC
MAYBANK PUD
PAGE 8
AUGUST 2026
Prohibited land uses within the CD include the following:
• Agriculture, stables / riding stables, forestry or fishing / commercial
fishing
• Mining and quarrying
• Construction with the exception of offices only
• Manufacturing of textiles, paper and allied products, chemicals and
allied products, petroleum, rubber / miscellaneous plastic products,
leather / leather products, metals / metal products, industrial and
commercial machinery and computer equipment, transportation and
miscellaneous manufacturing industries not elsewhere classified
• Railroad transportation, terminal and joint terminal maintenance
facilities for motor freight transportation, shipping container
storage (outdoor), water transportation or any kind, transportation
by air, stables, transportation services not elsewhere classified,
communications services not elsewhere classified including towers, gas
production and distribution, water treatment, sanitary services, sewage
treatment systems, and refuse systems
• Wholesale trade storage yards other than for vehicles or boats,
wholesale trade junk yards, scrap yards or auto salvage yards,
wholesale trade of chemical and allied products, petroleum and
petroleum products, petroleum bulk stations and terminals, petroleum
and petroleum products wholesalers, nondurable goods, mobile
homes dealers and nonstore retailers
• Cemeteries
• Camps / trailering parks, fraternity / sorority houses, dormitories, yacht
brokering, racing including track operation, casinos, outdoor shooting
range, riding stables, health services
• Correctional institutions
• Water storage tanks
• Gasoline service stations
• Boat dealers
• Recreational and utility trailer dealers
• Short term lender
• Farms and crop production
• Casinos
• Public, not for profit, golf courses and private or for-profit golf courses
• Shooting ranges
• Correctional institutions
• Arboreta, botanical and zoological gardens
• Laundry / power laundries, cleaning and garment services, garment pressing
and agents for laundries and dry cleaners, linen supply, diaper service, coin
operated laundries and dry cleaning and dry cleaning plants
• Private Households - One family detached dwellings, One family attached
dwellings, Multi-family dwellings / multi-family dwellings for the elderly, mobile
home parks / mobile homes
• Adult Uses as described in the City of Charleston Zoning Ordinance
PAGE 9
MAYBANK PUD AUGUST 2026
B. Dimensional Development & Parking Standards:
The Commercial District (CD) shall allow the following dimensional standards.
Zoning Criteria items not specifically addressed within this PUD shall comply with
the City of Charleston (GB) Zoning Requirements. The dimensional standards for
the CD were influenced by Charleston County’s James Island Maybank Highway
Corridor Overlay Zoning District.
COMMERCIAL DISTRICT - DIMENSIONAL STANDARDS
WITHOUT 50’ RIGHT-OF-WAY DEDICATION
Minimum Lot Width 50 feet
Minimum Setbacks None required
Maybank Highway R/W Buffer 75 feet
Maximum Building Coverage - Nonresidential
and Office Development 30%
Maximum Individual Building Footprint 5,000 sf
Maximum Impervious Surface Coverage -
Residential Development
40% of lot or as allowed by the current
edition of the City of Charleston
Stormwater Manual
Maximum Building Height 35 feet / 2.5 stories
Required Parking Per City of Charleston guidelines*
COMMERCIAL DISTRICT - DIMENSIONAL STANDARDS
WITH 50’ RIGHT-OF-WAY DEDICATION
Minimum Lot Width 50 feet
Minimum Setbacks Equivalent to required buffer
Maybank Highway R/W Buffer 75 feet
Maximum Building Coverage - Nonresidential
and Office Development 60%
Maximum Individual Building Footprint 20,000 sf
Maximum Impervious Surface Coverage -
Residential Development
60% of lot or as allowed by the current
edition of the City of Charleston
Stormwater Manual
Maximum Building Height 45 feet / 3.5 stories
Required Parking Per City of Charleston guidelines*
MAYBANK PUD
PAGE 10
AUGUST 2026
4.02 Residential District (RD)
A. Land Uses:
The Residential District (RD) Permitted Land Uses include all principle use types by
right per City of Charleston’s Ordinance; Article 2 - Land Use Regulations, Part 3 -
Table of Permitted Uses - Division I: Services - 88. Private Households (number per
lot) except as stated otherwise in this document.
Within the RD land and buildings may be erected, altered, or used for the
following permitted uses:
1. One-family attached and detached dwelling units.
2. Home occupations subject to permitting procedures and restrictions for
Home Occupations per Section 54-211 of the City of Charleston Zoning
Ordinance
3. Corner lots shall meet City of Charleston vision clearance triangle
requirements.
4. Steps, balconies, patios, open stairways, entry covers, bay windows, fire
boxes, and decks may extend fully into setbacks, but in no instance can they
extend into the right-of-way or drainage easements.
5. Eaves may extend two feet (2’) into setbacks, however in no instance can
any structure or eave extend into the right-of-way or drainage easements.
6. Fences may be up to 8’ in height.
7. One group of up to (6) model homes can be permitted and constructed
prior to final plat for the purpose of modeling the product and for use as a
marketing/sales office. Certificate of Construction Completion shall not be
issued until the final plat has been recorded.
8. One driveway with a maximum width of 11 feet at the right-of-way shall be
permitted in the front yard. There is no maximum width for driveways along a
rear alley.
9. On-street parking shall be provided as required in the City of Charleston
Zoning Ordinance - Section 54-821 - Street design standards - Table 8.1:
Minimum Street Widths - f.
Prohibited RD land uses include the following:
• Cemeteries
• Casinos
• Shooting ranges
• Correctional institutions
• Adult Uses as described in the City of Charleston Zoning Ordinance
PAGE 11
MAYBANK PUD AUGUST 2026
B. Dimensional Development & Parking Standards:
The Residential District (RD) shall allow single family attached and detached
dwelling units with the following dimensional standards. Zoning Criteria not
specifically addressed within this document shall adhere to City of Charleston
Code of Ordinances.
*Note: Accessory structures must be placed behind the front facade of the principal
structure.
Section 5 - Open Space
5.01 Total Open Space Area
• 15.61 Gross Acres x 20% = 3.12 Acres of Open Space Required
(Minimum of 20% of Gross area required)
5.02 Total Usable Open Space
• 3.12 Acres of Open Space x 25% = 0.78 Acres of Usable Open Space
Required (Minimum 25% of total open space required)
RESIDENTIAL DISTRICT - DIMENSIONAL STANDARDS
SINGLE FAMILY ATTACHED DETACHED
Minimum Lot Area 1,200 sf 3,000 sf
Minimum Lot Width 20 feet 30 feet
Minimum Lot Width for cul-de-sacs 16 feet 30 feet
Minimum Lot Depth 60 feet 85 feet
Minimum Setbacks:
Front 20 feet 20 feet
Side (for end units) 10 feet 5 feet
Rear 5 feet 10 feet
Accessory Building Setbacks 5’ side and 5’ rear*
Maximum Lot Occupancy 60% of lot 60% of lot
Maximum Height 45’ / 3.5 stories 45’ / 3.5 stories
Minimum Off-Street Parking 2 per unit 2 per unit
Maximum units in a row 6 units
OPEN SPACE REQUIREMENT TABLE
USE DISTRICT GROSS ACREAGE OPEN SPACE REQUIREMENT
Commercial District 2.29 AC 0.46 AC
Residential District 13.32 AC 2.66 AC
Total 15.61 AC 3.12 AC
MAYBANK PUD
PAGE 12
AUGUST 2026
5.03 Conceptual Plan for Open Space
The Maybank PUD will incorporate a thoughtfully designed network of open spaces that
promote recreation, connectivity, and environmental stewardship. These areas will include
active and passive zones all intended for the enjoyment of residents and the broader
community. Green spaces will be maintained by the Homeowners Association (HOA),
Property Owners Assocation (POA) or a business entity to ensure long-term care and visual
appeal. In accordance with the Johns Island Greenway Plan paths will be included outside
of the right-of-ways in HOA areas with their placement to be discussed with the city’s Mobility
Planner.
Amenity areas will not be required to go through the City of Charleston’s Design Review
Board (DRB) process. In accordance with City standards, no more than 50% of the total
area of constructed water features or preserved wetlands may be counted toward required
open space. However, designated buffer areas may be fully credited, reinforcing the PUD’s
commitment to preserving natural features while enhancing community access to green
space. Buffer areas may be counted towards useable open space.
Proposed improvements within park areas (±5,000 SF) shall include one or a combination of
the following:
• Playground
• Tables
• Pavilions
• Dog friendly areas
• Outdoor fitness areas
• Community gardens
• Other amenity features may be allowed as approved by the City of
Charleston’s TRC
Proposed improvements withing pocket park areas (±2,000 SF) shall include one or a
combination of the following:
• Grills
• Benches
• Small tables
• Lawn games
• Pollinator gardens
• Other amenity features may be allowed as approved by the City of
Charleston’s TRC
5.04 Ownership and Maintenance of Open Space
Open space within the Residential District shall be privately owned and maintained by the
HOA for the use of the community. All open space within the Commercial District shall be
maintained by a POA or owner of the property and shall be for use of all patrons.
PAGE 13
MAYBANK PUD AUGUST 2026
5.05 Open Space Definitions from the City of Charleston Zoning Ordinance
Section 54-120 - Definitions:
Open Space: Any parcel or area of land or water essentially unimproved and set aside,
dedicated, designated or reserved for public or private use or enjoyment, or for the use and
enjoyment of owners and occupants of land adjoining or neighboring such open space.
Open space shall not include streets, drives, off-street parking and loading areas, area so
located or of such size or shape to have no substantial aesthetic or recreational value and
any area within residential lots.
Section 54-256 - PUD Zoning Regulations:
Open Space. For PUD’s with a net acreage greater than ten (10) acres, a minimum of twenty
(20) percent of the gross acreage shall remain as open space; twenty-five (25) percent of
the required open space shall be developed and maintained as usable open space.
Section 6 - Buffers
6.01 Required Landscape Buffers
All buffer areas shall adhere to the City of Charleston’s Zoning Ordinance Article 3 - Site
Regulations, Part 8 - Landscape Buffer Requirements except as otherwise stated within this
PUD. All plant material is to be comprised of 100% native species. All efforts will be made to
retain the existing trees within buffer areas.
Existing vegetation may be used alone or in combination with new plantings to meet the
Landscape Buffer Requirements. Within the Maybank development, no external land use
buffers are required where Residential zoning directly abuts other Residential zoning. All
required buffers must be fully installed prior to final plat approval.
6.02 Maybank Highway Buffer
Note: Stormwater facilities are permitted in the back third (25’ zone) of the buffer and will be
supplemented with appropriate plant material.
BUFFER DEPTH AND PLANTING SCHEDULE
Minimum Buffer Depth 75 feet
Minimum Buffer Landscaping
(Plants per 100 linear feet)
Canopy Trees 9
Understory Trees
(At least 50 percent evergreen) 12
Shrubs 60
Street Trees
(May be counted toward canopy tree requirement) 2
Sidewalk Minimum 5’ width
Street Lighting: per City of Charleston Park Dept. recommendations
MAYBANK PUD
PAGE 14
AUGUST 2026
6.03 Fern Hill Drive Buffer
6.04 Ownership and Maintenance
All buffer areas in the Residential District areas shall be owned and maintained by the HOA
(Homeowners Association). In the Commercial District, property owners must own and
maintain all buffer areas located on their property.
Section 7 - Tree Summary
7.01 Summary of Existing Trees
Please see Exhibit B - Existing Conditions for the locations and size of all existing Protected
and Grand Trees. As defined in the City of Charleston’s Zoning Ordinance a protected tree
is any tree 8” or greater D.B.H and a grand tree is any tree 24” or greater in D.B.H., excluding
pine trees and sweetgum trees.
This PUD will be subject to the Tree Protection Requirements defined in Article 3 - Site
Regulations, Part 6 - Tree Protection Requirements of the City of Charleston’s Zoning
Ordinance; as currently defined at the time of the PUD Ordinance approval for the lifespan
of the development.
A local Certified Arborist evaluated the health and condition of all Grand Trees on site and
a report will be provided to the City of Charleston planning staff at the time of submission of
the construction drawings and/or variance request.
7.02 Tree Protection Standards
Tree barricades shall be required to provide tree protection. All tree protection standards as
described below are from Article 3 - Site Regulations, Part 6 - Tree Protection Requirements
of the City of Charleston’s Zoning Ordinance, and shall be followed. (The following standards
have not been altered from the ordinance that governed at the date of this PUD approval).
1. For protected trees twenty-three inches (23”) or less D.B.H. protective barricades
BUFFER DEPTH AND PLANTING SCHEDULE
Minimum Buffer Depth 10 feet
Minimum Buffer Landscaping
(Plants per 100 linear feet)
Canopy Trees 3
Understory Trees
(At least 50 percent evergreen) 3
Shrubs 20
An 8’ high opaque wall or fence shall be required within or adjacent to the
land use buffer.
PAGE 15
MAYBANK PUD AUGUST 2026
shall be placed a minimum distance of ten feet (10’) from the base of each pro-
tected tree; and
2. For protected trees greater than twenty-three inches (23”) D.B.H. and grand
trees protective barricades shall provide a diameter of protection around the
tree equal in feet to the diameter breast height of the tree (i.e., a 24” diameter
tree would require a 24-foot diameter protective barricade).
Any request for removal or encroachment of a Grand Tree shall comply with the City of
Charleston’s Zoning Ordinance; Sec. 54-329 - Standards for approval to remove trees.
Section 8 - Right-of-Way
8.01 Road Ownership
The PUD will be accessed via Maybank Highway, Southwick Drive, and Fern Hill Drive. These
public road extensions will be constructed to meet the City of Charleston’s standards.
Proposed interior drives shall be permitted and constructed by the Owner. Any alleys within
the project will be privately owned and maintained by the HOA. Site entrance roadways
and traffic signage shall conform to the Manual on Uniform Traffic Control Devices (MUTCD).
Sight distance and visibility at all exits and/or intersections will be maintained in accordance
with the SCDOT Access and Roadside Management Standards (ARMS) Manual.
8.02 Dimensions
Road rights-of-way will vary based on ownership. The public street section shall include a 22’
minimum paved section, roll curb and gutter, and a verge for landscaping. Street sections
may also be modified in order to preserve grand trees within the right-of-way if necessary.
See Exhibit E at the end of the document for street sections.
8.03 Sidewalks
Sidewalks throughout the development shall be concrete and a minimum of five feet (5’)
in width on both sides of the street within the right-of-way. If sidewalks travel onto private
property to avoid grand trees they shall require a public access easement. Sidewalks are
not required where there are alleys. Sidewalks shall meet the ADA requirements and ADA
compliant ramps shall be installed at street corners with sidewalks to provide accessible
routes. DRC approval is required for any non-standard material within public rights-of-way.
8.04 Street Lights / Street Trees
Street lights and street trees shall be installed per the requirements of the Department of
Parks street design standards to the maximum extent possible. See Exhibit E at the end of this
document for street sections.
8.05 Emergency/Public Service Access
All rights-of-way shall accommodate emergency vehicles and public service vehicles.
Access shall be provided to the community via an entrance from Maybank Highway and
MAYBANK PUD
PAGE 16
AUGUST 2026
Southwick Drive. At the end of the alley there is emergency only access.
Section 9 - Drainage Basin Analysis
9.01 Flood zone
The site lies within flood zone X as per FEMA Map Number 45019C0655K dates January 29,
2021 - City of Charleston 455412 / Charleston County Unincorporated Areas 455413.
9.02 Topography
The site is gently sloping from Maybank Highway toward existing wetlands at the back of
the property. The topography of the site ranges in elevation near the existing wetland areas.
There is a drainage basin that cuts through the southern half of the property.
9.03 Wetland Verification
An onsite wetland delineation was performed by Passerela resulting in a wetlands
delineation dated March 13, 2025. The existing 1.35 acres of wetland on site is classified
as “jurisdictional” by the US Army Corps of Engineers. See attached wetland exhibit by
Passerela. A jurisdictional determination package has been sent to the Army Corps of
Engineers.
9.04 Preliminary Stormwater Techniques
The property will be developed using on-site detention systems and best management
practices for both water quantity and quality control. Proposed drainage for the site will
be managed via a network of storm pipes, wet ponds, and outfall structures as required
for release into the wetlands on the site. Ponds may include bulkheads or walls to increase
storage capacity or improve aesthetics. In such cases, littoral shelves shall not be required.
Parking and stormwater management systems within private commercial areas shall be
maintained by the developer, owner, or HOA. The City of Charleston shall own and maintain
stormwater management system components that are constructed under or collect
stormwater runoff from a City owned road. The site stormwater management system must
meet all applicable State and Federal stormwater regulations. Low Impact Design (LID) and
green infrastructure techniques are allowed and encouraged to address stormwater.
Section 10 - Traffic Study
10.01 Traffic Study (Provided Under Separate Cover)
A traffic study will be conducted under separate cover and provided to the South Carolina
Department of Transportation (SCDOT) at the time of completion. SCDOT and the City of
Charleston Department of Traffic and Transportation will review the traffic study and work
with the developer to ensure that traffic safety and traffic operations in and around the site
are maintained as the project moves forward during construction permitting.
PAGE 17
MAYBANK PUD AUGUST 2026
Section 11 - Cultural Resources
11.01 Information Resource and Findings
The data research from The State Historic Preservation Office (SHPO) identified no
archaeological sites or isolated finds that would be considered eligible for further review. This
tract is located in South Carolina’s Coastal Zone of Johns Island in Charleston County. Johns
Island is considered an erosional remnant island. This area is primarily agriculturally affected
with good soils.
Section 12 - Letters of Coordination
12.01 Service Providers
The community will be served by the following service providers which have submitted letters
indicating willingness and sufficient capacity to serve the proposed development. These
letters are attached in the supporting Exhibits section which follows.
Potable Water Service
The St. Johns Water Company provides potable water service to this area of Johns Island. A
16” water main is located 700 feet from Fern Hill Drive on Maybank Highway.
Sanitary Sewer Service
The sewer system will be coordinated and dedicated to CWS.
Electric
Electric services will be provided by Berkeley Electric Cooperative.
Gas
Gas services will be provided by Dominion.
Telephone & Cable
Phone, cable, and internet service may be coordinated with and provided by Xfinity, AT&T
or other available providers at the time of installation.
Schools
The site is located within the Charleston County School District and area schools include
Angel Oak Elementary, Haut Gap Middle School, and St Johns High School.
Emergency Services
Emergency services will be provided by the City of Charleston.
MAYBANK PUD
PAGE 18
AUGUST 2026
Section 13 - Additional Development Criteria
13.01 Signage
All signs will require a building permit. Signs on the property shall adhere to the City of
Charleston Zoning Ordinance Article 4, except where otherwise stated in this PUD document.
All signage shall meet the City of Charleston’s vision clearance triangle requirements
and be approved by the City Design Review Board (DRB); with the exception of internal
neighborhood signage used for providing direction to on site amenities and/or structures.
Any signage proposed to be within a City of Charleston right-of-way shall require approval
from the City of Charleston Engineering Department.
The signs for the existing daycare shall remain in their current locations. A new sign for the
residential community shall be permitted along the Maybank Highway frontage on the side
of the entry into the project.
Neighborhood identification signs may also be placed at secondary entrances to
adjacent parcels. Additional identification and directional signage may be used within the
neighborhood for identification of community amenities. These signs shall not require City
Design Review Board approval.
Temporary signs will be permitted per the City of Charleston’s Zoning Ordinance - Section 54-
411.
13.02 Phasing
The proposed development may be designed and built in phases. Sales and/or construction
trailers will be allowed on HOA areas or designated lots prior to the recording of the bonded
plats. Site plan review and issuance of clearing and grading permits are required prior to the
issuance of the required permit.
In all cases where bondable items are required prior to the approval of the final plat of the
property, bondable items shall either be installed, inspected and deemed acceptable by
the City, or the Owner shall provide a performance bond, letter of credit, or other security
acceptable to the City in the amount of 150% of construction as a guarantee that the work
will be performed. Bondable items shall be contingent upon approval of encroachment
permit and construction plans by the City.
13.03 Design Review Board
If and when a property within the Commercial District is redeveloped, only the Commercial
District property shall be under the purview of the City’s Design Review Board (DRB). All
development within the residential district is not subject to the City of Charleston’s Design
Review Board (DRB).
PAGE 19
MAYBANK PUD AUGUST 2026
Exhibits
A. Aerial
B. Existing Conditions
C. Land Use
D. Open Space and Buffers
E. Road Layout
F. Drainage
G. Utilities
H. Signage
I. Road Cross Section: Type A
J. Road Cross Section: Type B
K. Road Cross Section: Type B - On-street parking on one side
L. Road Cross Section: Type C
M. Maybank Highway Buffer
N. Fern Hill Drive Buffer
O. Recorded Plats
P. Letters of Coordination
Q. Traffic Study (provided under separate cover)
R. Wetland Delineation
1.5'12'11'12'1.5'5'5'2'2'57'5'LEGENDPROPERTY LINEPUD BOUNDARY
COOPER LAW FIRMMAYBANK PUDTITLE:PROJECT:CLIENT:
THIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (A) AERIAL EXHIBIT Aug 19, 2026 9:03am by: Crystal.AponteAERIAL EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT A8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
SOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'S WOODS PKWY
NORTH
7/7.5/10" WATER OAK(D)
12.5/13" WATER OAK(D)
12.5/15" MULBERRY(D)
13/14" WATER OAK(D)
31" RED OAK(D)
7/17" WATER OAK(D)
24" BLACK GUM(D)
16/16" RED OAK(C)
28/55" LIVE OAK(C)
60" LIVE OAK(B)
5/6/6/8/12" WATER OAK(D)
9/9/9" WATER OAK(D)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
25" WATER OAK(D)
20/23" LIVE OAK(C)
18/23" LIVE OAK(C)
12/15" WATER OAK(C)
14/24" RED OAK(D)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
26" LIVE OAK(B)
34" MAGNOLIA(C)
26" WATER OAK(D)
24" WATER OAK(C)
24" LIVE OAK(C)
32" WATER OAK(C)
15/22" WATER OAK(D)
3/7/9/11" WATER OAK(D)
3/7/9/11" WATER OAK(D)
3/7/9/11" WATER OAK(D)
25" WATER OAK(D)
24" WATER OAK(D)
14/16" WATER OAK(NON GRADED)
25" WATER OAK(D)
3/7/7/12" MAPLE(D)
10/16" MAPLE(D)
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (B) EXISTING CONDITIONS EXHIBIT Aug 19, 2026 9:03am by: Crystal.AponteEXISTING CONDITIONS EXHIBITSHEET:EXHIBIT B8/19/2026
GRADE A
GRADE DGRADE FGRADE B
TREE PROTECTION ZONEGRADE C
TITLE:PROJECT:CLIENT:JOB NUMBER:SCALE:DATE:0182781001" = 150'
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THE PLANSMAY BE ALTERED BY SEPARATE SUBMITTAL OFINDIVIDUAL SITE PLANS.NORTH
SOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'SWOODS PKWY
LEGENDPROPERTY LINEPUD BOUNDARY
TREE GRADES:
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
EXISTING CONDITIONS NOTES:1.EXISTING CONDITIONS SHOWN HEREON ARE FROMA SURVEY FILE PROVIDED BY HLA, INC. DATED03/13/2025. WETLANDS SHOWN WERE DELINEATEDIN THE FIELD BY PASSARELLA AND ASSOCIATES.2.UTILITIES MAY EXIST WHICH ARE NOT SHOWN ONTHE PLANS. THE CONTRACTOR SHALL BERESPONSIBLE FOR CONTACTING ALL UTILITYCOMPANIES HAVING UTILITIES WITHIN ORADJACENT TO THE WORK AREA. THECONTRACTOR SHALL HAVE THE UTILITIES FIELDLOCATED AND COORDINATE WITH THE UTILITYCOMPANIES TO HAVE CONFLICTS RELOCATEDWHEN NECESSARY OR ADAPTED FOR TIE-INS.3.THE PROJECT SITE DOES NOT LIE WITHIN A FLOODHAZARD AREA PER FIRM PANEL 45019C0655KDATED 01/29/2021.
3294 MAYBANK HWYJOHNS ISLAND, SC 29455
1730 FERNHILL DRJOHNS ISLAND, SC 29455
1738 FERNHILL DRJOHNS ISLAND, SC 29455
3280 MAYBANK HWYJOHNS ISLAND, SC 29455
SOUTHWICK DR - MAINTAINED BY STATE
FERN HILL DR - MAINTAINED BY COUNTY
WETLANDSMUNICIPAL BOUNDARY
1.5'12'11'12'1.5'5'5'2'2'57'
BRIGHT OAKPRESCHOOLACADEMY
5'
60" LIVE OAK(B)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
18/23" LIVE OAK(C)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
14/16" WATER OAK(NON GRADED)
10/16" MAPLE(D)
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (C) LAND USE EXHIBIT Aug 19, 2026 9:03am by: Crystal.AponteLAND USE EXHIBITSHEET:EXHIBIT C8/19/2026
COMMERCIAL DISTRICT (CD)2.29 ACRES (15%)RESIDENTIAL DISTRICT (RD)13.32 ACRES (85%)DENSITY: 4.65 DU/ACMAX ALLOWED: 69 UNITSJOB NUMBER:SCALE:DATE:0182781001" = 150'
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
SOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'SWOODS PKWYLEGENDPROPERTY LINEPUD BOUNDARY
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
WETLANDS
BRIGHT OAKPRESCHOOLACADEMY
60" LIVE OAK(B)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
18/23" LIVE OAK(C)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
14/16" WATER OAK(NON GRADED)
10/16" MAPLE(D)
BRIGHT OAKPRESCHOOLACADEMY
7/7.5/10" WATER OAK(D)
12.5/13" WATER OAK(D)
12.5/15" MULBERRY(D)
13/14" WATER OAK(D)
31" RED OAK(D) 7/17" WATER OAK(D)
24" BLACK GUM(D)
16/16" RED OAK(C) 28/55" LIVE OAK(C)
5/6/6/8/12" WATER OAK(D)
9/9/9" WATER OAK(D)25" WATER OAK(D)
20/23" LIVE OAK(C)
12/15" WATER OAK(C)14/24" RED OAK(D)
26" LIVE OAK(B)
34" MAGNOLIA(C)26" WATER OAK(D)24" WATER OAK(C) 24" LIVE OAK(C)
32" WATER OAK(C)
15/22" WATER OAK(D) 3/7/9/11" WATER OAK(D)3/7/9/11" WATER OAK(D)3/7/9/11" WATER OAK(D)
25" WATER OAK(D) 24" WATER OAK(D)
25" WATER OAK(D)3/7/7/12" MAPLE(D)
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (E) ROADS AND CIRCULATION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD LAYOUT EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT E8/19/2026
SOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'SWOODS PKWYPROPOSED ROADS
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
LEGENDPROPERTY LINEPUD BOUNDARY
PROPOSED VEHICLE CONNECTION
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
WETLANDS
A'AB'BC'CB'B
ROAD SECTIONSEE EXHIBITS I-L
ROAD A
ROAD B
ROAD C1" = 500'
BRIGHT OAKPRESCHOOLACADEMY
60" LIVE OAK(B)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
18/23" LIVE OAK(C)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
14/16" WATER OAK(NON GRADED)
10/16" MAPLE(D)
MAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (F) DRAINAGE EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteDRAINAGE EXHIBITJOB NUMBER:SCALE:DATE:SHEET:1" = 150'EXHIBIT F8/19/2026
SOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'SWOODS PKWY
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
LEGENDPROPERTY LINEPUD BOUNDARY
INFILTRATIONBASINSTORM
0182781001080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390 COOPER LAW FIRMWETLANDSTRIBUTARYSWALE
BRIGHT OAKPRESCHOOLACADEMY
60" LIVE OAK(B)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
18/23" LIVE OAK(C)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
14/16" WATER OAK(NON GRADED)
10/16" MAPLE(D)INFILTRATIONBASIN 3
INFILTRATIONBASIN 1
INFILTRATIONBASIN 4
SEA ISLAND HABITATFOR HUMANITYRESTORE
SEA ISLAND HABITATFOR HUMANITYRESTORE PARKING LOT
PRESERVEDWETLAND
PRESERVEDWETLANDPOCKETPARK
PARK
POCKETPARK
POCKETPARK
EXISTINGPONDEXISTINGDRY PONDINFILTRATIONBASIN 5
INFILTRATIONBASIN 2
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (D) OPEN SPACE AND BUFFERS EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteOPEN SPACE AND BUFFERSEXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT D8/19/2026
USEABLE OPEN SPACEREQUIRED: 0.78PROVIDED: 2.14 ACPASSIVE OPEN SPACEPROVIDED: 1.47 AC
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
LEGENDPROPERTY LINEPUD BOUNDARY
CONSTRUCTED WATER FEATURE /PRESERVED WETLANDSOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'SWOODS PKWY
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
WETLANDSMAYBANK HIGHWAY BUFFER*FERN HILL DRIVE BUFFER*TRIBUTARY
MAYBANK HIGHWAY BUFFER
FERN HILL DRIVE BUFFER
*NOTE: EXISTING TREES IN THE BUFFER ZONESHALL BE PRESEVERED IF NOT IN CONFLICTWITH AN APPROVED IMPROVEMENT
TRAIL
HOA/POA MAINTAINED AREAS NOTCONSIDERED TO BE OPEN SPACE
PEDESTRIAN TRAILCONNECTION POINTSTOTAL OPEN SPACEREQUIRED: 3.12 ACPROVIDED: 3.61 AC (2.14 AC USABLE OPEN SPACE +1.47 AC PASSIVE OPEN SPACE)
SS
SS
SS
SS
SS
SS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSSSSSSSS
8W
8W8W
SS
SSSSSSSSSSSSSS
8W
8W
8W
SS
SSSS
SS
SSSSSSSS SSSSSSSSSSSSSSSSSSSSSSSSSS
8W
60" LIVE OAK(B)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
18/23" LIVE OAK(C)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
14/16" WATER OAK(NON GRADED)
10/16" MAPLE(D)
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (G) UTILITIES EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteUTILITIES EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT G8/19/2026
SOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAYST JOHN'SWOODS PKWYLEGENDPROPERTY LINEPUD BOUNDARYSEWERWATERWWWWW
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
WETLANDS
BRIGHT OAKPRESCHOOLACADEMY
60" LIVE OAK(B)
42" WATER OAK(D)
4/13/13" MAPLE(D)
2/5/8/10/10" MAPLE(D)
18/23" LIVE OAK(C)
3/5/18" WATER OAK(D)
31" WATER OAK(C)
42" LIVE OAK(C)
14/16" WATER OAK(NON GRADED)
10/16" MAPLE(D)
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (H) SIGNAGE EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteSIGNAGE EXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT H8/19/2026
LEGEND
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
ST JOHN'SWOODS PKWYSOUTHWICK DRIVE
FERN HILL DRIVE
MAYBANK HIGHWAY
RESIDENTIALCOMMUNITY SIGNWETLANDS
PROPERTY LINEPUD BOUNDARYNEIGHBORHOODIDENTIFICATION SIGN
5' VEGETATIVE STRIP BOTH SIDES1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS
PROPOSED STREET TREES1.5'12'
5' VEGETATIVE STRIP1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES12' TRAVEL LANE
11'12'1.5'5'5'2'2'
12' TRAVEL LANE11' TURN LANE
℄57'
A A'5'
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (I) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE AJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT I8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
2.5'5'5'11'11'1.5'5'5'2.5'1.5'℄
5' VEGETATIVE STRIP BOTH SIDES1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS
PROPOSED STREET LIGHTSPROPOSED STREET TREES
B B'
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (J) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE BJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT J8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
0.5'50' R/W℄
7' ON-STREET PARKING5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS
PROPOSED STREET TREES
5' VEGETATIVE STRIPB B'
2.5'50' R/W5'5'11'11'7'5'0.5'1.5'℄
5' VEGETATIVE STRIP1.5' ROLL CURB BOTH SIDES5' SIDEWALK BOTH SIDES11' TRAVEL LANES BOTH WAYS
PROPOSED STREET LIGHTSPROPOSED STREET TREES
B B'0.5'5'1.5'7'11'11'1.5'5'5'2.5' 1.5'
1.5' ROLL CURB BOTH SIDES7' ON-STREET PARKING
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (K) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE B - ON-STREET PARKINGON ONE SIDEJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT K8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
5' SIDEWALKPROPERTY LINE1.5' ROLL CURB BOTH SIDES10' TRAVEL LANES BOTH WAYS
℄C C'4' UTILITY CORRIDOR7' ON-STREET PARKING ON ONE SIDE
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (L) ROAD CROSS SECTION EXHIBIT Aug 19, 2026 9:04am by: Crystal.AponteROAD CROSS SECTION EXHIBIT:TYPE CJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 150'EXHIBIT L8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
25'EVENTS ANDSTORM WATER25'TRAIL ANDSTREETLIGHTING
25'TREESCAPEAND REQUIREDPLANTINGSMAYBANKHIGHWAY
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (M) PUD SECTIONS Aug 19, 2026 9:04am by: Crystal.AponteMAYBANK HIGHWAY BUFFEREXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 10'EXHIBIT M8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
PLANTINGREQUIREMENTSMINIMUM BUFFER DEPTH: 75 FEET100% NATIVE PLANTINGS TO BE USEDMINIMUM BUFFER LANDSCAPING - PLANTS PER 100 LINEAR FEETCANOPY TREES: 9UNDERSTORY TREES: 12(50 PERCENT EVERGREEN)SHRUBS: 60STREET TREES: 2(MAY BE COUNTED TOWARD CANOPY TREE REQUIREMENT)SIDEWALK: 5' MINIMUMSTREET LIGHTING PER CITY OF CHARLESTON PARK DEPARTMENT RECOMMENDATIONS
COOPER LAW FIRMMAYBANK PUDTHIS DOCUMENT, TOGETHER WITH THE CONCEPTS AND DESIGNS PRESENTED HEREIN, AS AN INSTRUMENT OF SERVICE, IS INTENDED ONLY FOR THE SPECIFIC PURPOSE AND CLIENT FOR WHICH IT WAS PREPARED. REUSE OF AND IMPROPER RELIANCE ON THIS DOCUMENT WITHOUT WRITTEN AUTHORIZATION AND ADAPTATION BY KIMLEY-HORN AND ASSOCIATES, INC. SHALL BE WITHOUT LIABILITY TO KIMLEY-HORN AND ASSOCIATES, INC. COPYRIGHT KIMLEY-HORN AND ASSOCIATES, INC., 2017K:\CHA_LDEV\018278 Cooper Law Firm\100 Maybank PUD\02 - DWG\Exhibits\Exhibit File\2026.08.06 - Maybank PUD Exhibit.dwg (N) PUD SECTIONS Aug 19, 2026 9:04am by: Crystal.AponteFERN HILL DRIVE BUFFEREXHIBITJOB NUMBER:SCALE:DATE:SHEET:0182781001" = 10'EXHIBIT N8/19/2026
NOTE:THE PUD EXHIBITS ARE SUBJECT TOCHANGE. IT IS NOT THE INTENT OF THE EXHIBITTO LIMIT THE SIZE OR LOCATION OF INTERNALCIRCULATION, BUILDING FOOTPRINTS ORNUMBER OF LOTS. WITH THE APPROVAL OF THEZONING ADMINISTRATOR AND/OR TRC THEPLANS MAY BE ALTERED BY SEPARATESUBMITTAL OF INDIVIDUAL SITE PLANS.NORTH
1080 MORRISON DR, SUITE 240,CHARLESTON, SC 29403(843) 737-6390
PLANTINGREQUIREMENTSMINIMUM BUFFER DEPTH: 10 FEET100% NATIVE PLANTINGS TO BE USEDMINIMUM BUFFER LANDSCAPING - PLANTS PER 100 LINEAR FEETCANOPY TREES: 3UNDERSTORY TREES: 3(50 PERCENT EVERGREEN)SHRUBS: 20AN 8' HIGH OPAQUE WALL OR FENCE SHALL BE REQUIRED WITHINOR ADJACENT TO THE LAND USE BUFFER
Daniel O. Duggan, MBA
Senior Account Manager
2390 W. Aviation Ave
Charleston, SC 29406 Mail Code CH 61
Phone: (843) 834-1016
Daniel.Duggan@DominionEnergy.com
May 8, 2026
Re: 1730 Fernhill Dr, Johns Island, SC, 29455
Quinn Daniels, EIT | Civil Analyst
Kimley-Horn | 1080 Morrison Drive, Suite 240, Charleston, SC, 29403
Quinn:
Thank you for your inquiry about natural gas service for the above address. As of the date of this letter, natural gas, due
to future unknown considerations such as available gas supply, available capital investment, requested equipment loads
and pressures, and other business and operational factors, service cannot be confirmed at this time. Once we have all
the below information, an engineering study will be performed to determine our ability to serve th e project and analyze if
there will be a cost to you associated with serving the project based on the information and gas load you provided.
Please provide the below information:
1) Detailed utility site plan (in AutoCAD) showing water, sewer, and storm drainage. The finalized/approved
plan must include lot numbers, street names, and 911 addresses for each lot/building.
2) Additional drawings that indicate wetlands boundaries; utility rights-of-way inside the project; rights-of-
way given by adjacent landowners; restricted areas; tree survey with barricade plan; buffer zones (if
required); as well as any existing or additional easements.
3) Copies of applicable SCDHEC, USACE, USFWS, MS4, SCDOT, county/municipal, and all other permits
and delineations potentially affecting gas line installations.
4) A list of all natural gas appliances and equipment to be installed. For Commercial projects, we will also
need the BTUH load for each appliance/piece of equipment.
5) A signed copy of this letter acknowledging its receipt and responsibility for its contents and authorization
to begin engineering work. Any Contribution in Aid of Construction (CIAC) associated with providing
service will be determined when a finalized/approved plan is submitted to our office. Full payment of the
Contribution in Aid of Construction (CIAC) must be received before engineering or permitting of the gas
line will begin.
6) Requested date of active service.
7) Other information needed: (if left blank no other information is required at this time)
For more information or questions, contact me by phone at (843-834-1016) or at
Daniel.Duggn@DominionEnergy.com.
Sincerely,
Daniel O. Duggan
Senior Account Manager
June 24, 2025
Attn: Emma Mujezin
Landscape Architect Intern
Kimley-Horn - 1080 Morrison Dr, Suite 240, Charleston, SC 29403
RE: Charleston County TMS # 279-00-00-025, 010, 288, 008, 009, 017. TMS #313-
00-00-047 and 313-00-00-237. Letter of Coordination for proposed project along
Maybank Hwy, Johns Island.
Emma,
This letter is in response to your request for information on the availability of
service at the above list project, locations or development by AT&T.
This letter acknowledges the above referenced list project, locations or
development is in an area served by AT&T. Any service arrangements for the list
project, locations, or development will be subject to later discussions and
agreements between the developer and AT&T. Please be advised that this letter is
not a commitment by AT&T to provide service to project, locations or
development.
Please contact me at the phone number included in this letter with any questions.
Thank you for contacting AT&T.
Allen Stanfield
Sr Specialist-OSP Design Engineer
SE, AT&T Network Operations
2600 Meeting Street Rd.
Charleston, SC 29405
Ofc (843) 740-1836
Cell (843) 801-8006
AS1555@ATT.com
PO Box B
Charleston, SC 29402
103 St. Philip Street (29403)
(843) 727-6800
www.charlestonwater.com
Board of Commissioners
Thomas B. Pritchard, Chairman
Kathleen G. Wilson, Vice Chairman
William E. Koopman, Jr., Commissioner
Mayor William Cogswell, Ex-Officio
City Councilmember Perry K. Waring, Ex-Officio
Officers
Mark Cline, P.E., Chief Executive Officer
Wesley Ropp, CMA, Chief Financial Officer
Russell Huggins, P.E., Capital Projects Officer
Paul Hanson, Chief Information Officer
Baker Mordecai, P.E., Chief Operating Officer
Evelyn Ferguson, Chief Administrative Officer
Supporting public health and protecting the environment.
April 7, 2025
Andrew Allen
Kimley-Horn
Andrew.allen@kimley-horn.com
Sewer Availability TMS 313-00-00-047, 237, 279-00-00-017, 008, 009, 288
Single Family Residential Development
This letter is to certify Charleston Water Systems willingness and ability to serve the proposed development
in Charleston County with sewer collection service. CWS currently has an existing 12” sewer main in the
ROW of Maybank Hwy as well as a 15” gravity sewer main in the ROW of Southwick Drive which can be
extended to serve the development. Please contact the St Johns Water Company for information regarding
water availability.
It will be a developer responsibility to ensure there are adequate capacities in the existing mains to serve this site
with wastewater collection and not negatively impact the existing development. Please be advised any
extensions or modifications to the infrastructure will be a developer’s expense. All fees and cost associated with
providing service to this site will be a developer expense and will be due prior to connection of any Charleston
Water System’s sewer system. This letter does not reserve capacity in the Charleston Water System
infrastructure, and it is incumbent upon the developer or his agent to confirm the availability herein granted
past 12 months of this correspondence.
The Charleston Water System certifies the availability of service only insofar as its rights allow. Should access
to our existing main/mains be denied by appropriate governing authorities, the Charleston Water System will
have no other option than to deny service. This letter is not to be construed as a letter of acceptance for
operation and maintenance from the Department of Environmental Services. If there are any questions
pertaining to this letter, please do not hesitate to call on me at (843) 727-6869.
Sincerely,
Lydia Owens
Charleston Water System
Charleston )excellence is our standard
STUDENTS ARE
THE HEART
-�-CountySCHOOL DISTRICT OFOURWORK!
Operations Division
Anita W. Huggins
Acting Superintendent of Schools
Jeffrey Borowy, P.IE.
Chief Operating Officer
June 26, 2025
Kimley Horn
Attn: Andrew Todd-Burke
1080 Morrison Drive, Suite 240
North Charleston, SC 29405
Subject: Maybank PUD - 8 parcels between Fernhill Drive,
Southwick Drive, and Maybank Highway
Dear Mr. Todd-Burke:
Please accept this letter as "Proof of Coordination" and adequate service
capacity for the proposed project located in the vicinity listed above in Johns
Island. The planned design will consist of thirty-two single family attached
and thirty-five single family detached units.
To determine an estimate of student yield that any development may create,
a statistical formula is applied at the elementary, middle, and high school
levels based on the type and number of units to be built.
On the basis of the information supplied to us, the four main schools that fall
within the attendance zone where the development will take place are listed
below and are subject to zoning modification.
• Angel Oak ES (4K-1)
• Johns Island ES (2-5)
• Haut Gap MS (6-8)
• St Johns HS (9-12)
From a capacity standpoint, we anticipate no impact to the schools listed above
for the upcoming (2025-2026) school year.
Due to the number of projects currently underway and those that are
scheduled to be completed in phases, we strongly urge that all Proof of
Coordination letters be reviewed and updated annually.
Please contact me at (843) 566-1995 if you have any questions and/or
concerns.
Sincerely,
(H��
Heather Studer
Interim Director of Planning & Real Estate
3999 Bridge View Drive • N. Charleston, SC 29405 • tel. (843) 566-1975 • www.ccsc!scl1ools.com
July 10, 2025
Kimley-Horn
C/o: Emma Mujezin
1080 Morrison Drive, Suite 240
Charleston, SC 29403
Re: Power Availability for Proposed 32-Unit Townhomes and 35 Single Family Residential Units Located off
Maybank Highway
Charleston County, SC
TMS 279-00-008, 009, 010, 017, 025, 288
TMS 313-00-00-047
TMS 313-00-00-237
Dear Emma:
Berkeley Electric Cooperative will supply the electrical distribution requirements for the above referenced location. We look
forward to extending our facilities to meet the needs of this property.
All services that are rendered will be under our service rules and regulations at the time of service. If you have any
questions, please don’t hesitate to give me a call.
Sincerely,
Kevin Mims
Manager of Distribution Design and Easements
KM/ts
Cc: Thomas Barnette, Director of Engineering Services
Scott Bennett, Johns Island District Operations Manager
Emma Mujezin, Kimley-Horn (emailed copy)
File
Post Office Box 1234
Moncks Corner, SC 29461
(843) 761-8200
Fax (843) 571-1280
Post Office Box 128
Johns Island, SC 29457
(843) 559-2458
Fax (843) 559-3876
Post Office Box 1549
Goose Creek, SC 29445
(843) 553-5020
Fax (843) 553-6761
Post Office Box 340
Awendaw, SC 29429
(843) 884-7525
Fax (843) 881-8588
ST. JOHN’S WATER COMPANY, INC.
“This institution is an equal opportunity employer and provider”
Post Office Box 629
John’s Island, South Carolina 29457-0629
Phone (843) 559-0186
Fax (843) 559-0371
Original: September 10, 2024
Updated: April 7, 2025
Andrew Allen
Kimley Horn
1080 Morrison Drive, Suite 240
Charleston, SC 29403
Re: Fern Hill Development at TMS numbers 313-00-00-047 & 237 and 279-00-00-017 & 009
& 008 & 288
Water Availability and Willingness to Serve
Dear Andrew Allen:
This letter is to confirm that the Fern Hill Development proposing the construction of 69
new residential units (34 townhomes and 35 detached units) at TMS numbers 313-00-00-047 &
237 and 279-00-00-017 & 009 & 008 & 288 on Johns Island is within the water service area of
the St. John’s Water Company, Inc. (SJWC). SJWC does have wa ter available from an existing
16-inch water line on Maybank Highway located approximately 700 feet from Fern Hill Drive.
The smaller 6 -inch water line on Maybank Highway adjacent to Fern Hill Drive will not have
enough capacity to serv e the development. H owever, th e 16-inch water main on Maybank
Highway approximately 700 feet from Fern Hill Drive will be able to provide capacity. Our
system is SC DHEC approved and we have the capacity and willingness to provide potable water
service to Fern Hill Development at TMS numbers 313-00-00- 047 & 237 and 279-00-00- 017 &
009 & 008 & 288 for the development of approximately 69 residential units.
If you have any questions, please feel free to give me a call at 843-514-5570.
Sincerely,
Colleen Schild
Assistant Manager/Engineer
Board Members
Thomas Legare, Jr., Chair
Cindy Floyd, Vice Chair
Glenda Miller, Sec/Treas
H. Bernard Freeman
Isaac Robinson
Becky J. Dennis
Mellen Moore
Tommy West
Richard Thomas
April 2026
© Kimley-Horn and Associates, Inc.
DRB Maybank Residential Development
Traffic Impact Study
Charleston, South Carolina
Prepared for
DRB Group
Prepared by
DRAFT
April 2026
© Kimley-Horn and Associates, Inc.
1080 Morrison Dr, Suite 240
Charleston, South Carolina, 29403
DRB Maybank Residential Development
Traffic Impact Study
Charleston, South Carolina
Prepared for
DRB Group
Prepared by
This document has been digitally signed and sealed by Richard M.
Reiff, South Carolina Professional Engineer Number 27504, on
February 20, 2025. This electronic document is 110 pages in length.
The digital signature certificate must be verified on any electronic
copies of this document.
Printed copies of this document are not considered signed and
sealed.
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page i April 2026
Table of Contents
Executive Summary .................................................................................................................iii
1 Introduction ...........................................................................................................................1
1.1 Existing Conditions...................................................................................................................... 1
2 Project Traffic .......................................................................................................................4
2.1 Trip Generation ........................................................................................................................... 4
2.2 Trip Distribution & Assignment .................................................................................................... 4
3 Traffic Volume Development................................................................................................6
3.1 Existing Traffic Volumes .............................................................................................................. 6
3.2 No-Build Traffic Volume Development ......................................................................................... 6
3.3 Build Traffic Volume Development............................................................................................... 6
4 Traffic Signal Warrant Analysis .........................................................................................10
5 Capacity Analysis ...............................................................................................................12
5.1 Maybank Highway & Southwick Drive........................................................................................ 13
5.2 Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 ........................................ 14
5.3 Maybank Highway & Fern Hill Drive .......................................................................................... 15
5.4 Fern Hill Drive & Cross Island Extension ................................................................................... 15
5.5 Cross Island Extension & Project Driveway #1 .......................................................................... 16
5.6 Cross Island Extension & Southwick Drive ................................................................................ 16
6 Conclusion ..........................................................................................................................17
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page ii April 2026
List of Figures
Figure ES-1 – Recommended Geometry and Traffic Control ..................................................... iv
Figure 1 – Project Location Map .................................................................................................2
Figure 2 – Conceptual Site Plan ..................................................................................................3
Figure 3 – Project Trip Distribution and Assignment ....................................................................5
Figure 4 – 2025 Existing Peak Hour Traffic Volumes ..................................................................7
Figure 5 – 2028 No-Build Peak Hour Traffic Volumes .................................................................8
Figure 6 – 2028 Build Peak Hour Traffic Volumes .......................................................................9
Figure 7 – Recommended Geometry and Traffic Control ..........................................................18
List of Tables
Table 1 - Trip Generation Summary ............................................................................................4
Table 2 – Traffic Signal Warrant Analysis Results Summary .....................................................11
Table 3 – HCM7 Level of Service Criteria .................................................................................12
Table 4 – Maybank Highway & Southwick Drive/Plaza Entrance Capacity Analysis Results .....13
Table 5 – Maybank Highway & St. John’s Woods/Project Driveway #1 Parkway ......................14
Table 6 – Maybank Highway & Fern Hill Drive Capacity Analysis Results .................................15
Table 7 – Fern Hill Drive & Cross Island Extension Capacity Analysis Results..........................15
Table 8 – Cross Island Extension & Project Driveway #1 Capacity Analysis Results.................16
Table 9 – Southwick Drive at Cross Island Extension Analysis Results .....................................16
List of Appendices
A – Turning Movement Count Data
B – Historic Growth Rate Data
C – Volume Development Worksheets
D – Traffic Signal Warrant Analysis Worksheets
E – Capacity Analysis Worksheets
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page iii April 2026
Executive Summary
The purpose of this Traffic Impact Study (TIS) is to review the vehicular traffic impacts of the
proposed DRB Maybank Residential Development in the City of Charleston, South Carolina. The
proposed development is located on the north side of Maybank Highway between Southwick
Drive and Fernhill Drive. The development is expected to consist of up to 38 single-family
detached and 38 single-family attached dwelling units. The development will access the roadway
network via one full-access driveway along Maybank Road that aligns with St. Johns Woods
Parkway and a new roadway connecting Southwick Drive and Fern Hill Drive referred to as Cross
Island Extension in this study.
This TIS evaluates traffic operations under 2025 Existing and 2028 horizon conditions in
accordance with SCDOT guidelines. The following improvements are recommended based on
the results of the traffic analysis.
Maybank Highway & St. Johns Woods Parkway/Project Driveway #1
· Signalize the intersection.
· Construct Project Driveway #1 with a shared through/left-turn lane and a dedicated right-
turn lane with 200 feet of full-width storage and 145 feet of taper.
· Re-mark the Maybank Highway two-way left-turn to consist of dedicated eastbound left-
turn lane with 150 feet of full-width storage and 180 feet of taper.
Cross Island Extension & Southwick Drive
· Southwick Drive to operate with stop-sign control.
Cross Island Extension & Project Driveway #1
· Project Driveway #1 to operate with stop-sign control.
Fern Hill Drive & Cross Island Extension
· Cross Island Extension to operate with stop-sign control.
Recommended roadway geometry and intersection control improvements are illustrated inFigure
ES-1.
DRAFT
6 'Int 6'! 5 'Int 5'! 4 'Int 4'!
1 'Int 2'! 3 'Int 3'!
DRB Maybank Residential Development TIS
Figure ES-1 - Recommended Geometry and Traffic Control
Maybank
Highway
St. Johns
Woods Parkway
Fern Hill Drive
Southwick Drive
Plaza Entrance
Cross Island
Extension
Cross Island
Extension
Project Driveway #1
Project
Site
Project
Site
S = 250'
TWLTL
TWLTL
S = 200'
Legend
Existing Laneage
Recommended Laneage
S = XX' Storage Length
TWLTL Two-Way Left-Turn Lane
Existing Signal
Existing Stop Control
Recommended Stop Control
S = 150'
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 1 April 2026
1 Introduction
The purpose of this TIS is to review the vehicular traffic impacts of the proposed DRB Maybank
Residential Development in the City of Charleston, SC. The proposed development is located on
the north side of Maybank Highway between Southwick Drive and Fernhill Drive. The
development is expected to consist of up to 38 single-family detached and 38 single-family
attached dwelling units. The development will access the roadway network via one full-access
driveway along Maybank Road that aligns with St. Johns Woods Parkway and a new roadway
connecting Southwick Drive and Fern Hill Drive referred to as Cross Island Extension in this study.
This TIS evaluates traffic operations under 2025 Existing and 2028 horizon conditions in
accordance with SCDOT guidelines. The study area consists of the following intersections.
1. Maybank Highway & Southwick Drive/Plaza Entrance
2. Maybank Highway & St. Johns Woods Parkway/Project Driveway #1
3. Maybank Highway & Fern Hill Drive
4. Fern Hill Drive & Cross Island Extension
5. Cross Island Extension & Project Driveway #1
6. Cross Island Extension & Southwick Drive
The location of the proposed development is illustrated inFigure 1. A conceptual site plan for the
development is provided in Figure 2.
1.1 Existing Conditions
Maybank Highway is a two-lane, undivided, urban minor arterial roadway with a posted speed
limit of 45 miles per hour. Based upon SCDOT data, 19,200 vehicles per day (vpd) traveled along
Maybank Highway in 2024.
Southwick Drive is a two-lane, undivided, urban local road with a posted speed limit of 35 mph.
Based upon the traffic count data collected for this study, approximately 2,460 vpd traveled along
Southwick Drive.
Fern Hill Drive is a two-lane, undivided, urban local road with a posted speed limit of 25 mph.
Based upon SCDOT data, 650 vpd traveled along Fern Hill Drive in 2024.
DRAFT
DRB Maybank Residential Development TIS
Figure 1 - Site Location Map
1
3
6
5
2
4
DRAFT
DRB Maybank Residential Development TIS
Figure 2 - Conceptual Site Plan
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 4 April 2026
2 Project Traffic
2.1 Trip Generation
The trip generation rates and equations published in the Institute of Transportation Engineers
(ITE) Trip Generation Manual, 11th Edition were used to estimate the trip generation potential of
the development. The analysis was performed using the information provided for land use code
(LUC) 210 – Single Family Detached Housing and LUC 215 – Single-Family Attached Housing.
Internal capture and pass-by trip reductions were not considered in the trip generation analysis
due to the nature of residential development.
The estimated trip generation potential of the DRB Maybank Residential Development is
summarized in Table 1, which indicates that the development is anticipated to generate 45 trips
during the AM peak hour and 59 trips during the PM peak hour.
Table 1 - Trip Generation Summary
Land Use Intensity Units Daily AM Peak Hour PM Peak Hour
Total In Out Total In Out
210 - Single-Family Detached Housing 38 DU 414 31 8 23 40 25 15
215 - Single-Family Attached Housing 38 DU 239 14 4 10 19 11 8
Total Net New External Trips 653 45 12 33 59 36 23
Daily Traffic Generation
210 - Single-Family Detached Housing ITE 210 = LN (T) = 0.92 * LN (X) + (2.68); (50 % In; 50 % Out)
215 - Single-Family Attached Housing ITE 215 = T = 7.62 * (X) + (-50.48); (50 % In; 50 % Out)
AM Peak-Hour Traffic Generation
210 - Single-Family Detached Housing ITE 210 = LN (T) = 0.91 * LN (X) + (0.12); (26 % In; 74 % Out)
215 - Single-Family Attached Housing ITE 215 = T = 0.52 * (X) + (-5.7); (31 % In; 69 % Out)
PM Peak-Hour Traffic Generation
210 - Single-Family Detached Housing ITE 210 = LN (T) = 0.94 * LN (X) + (0.27); (63 % In; 37 % Out)
215 - Single-Family Attached Housing ITE 215 = T = 0.6 * (X) + (-3.93); (57 % In; 43 % Out)
2.2 Trip Distribution & Assignment
New external trips generated by the proposed development were distributed and assigned to the
surrounding roadway network based on existing travel patterns, surrounding land uses, and the
proposed site layout. The trip distribution percentages used in this analysis are as follows.
· 25% to/from the north via Southwick Drive
· 50% to/from the east via Maybank Highway
· 25% to/from the west via Maybank Highway
The project trips were then assigned to the existing roadway network. The assumed distribution
and assignment of new project trips are illustrated in Figure 3.
DRAFT
6 'Int 6'! 5 'Int 5'! 4 'Int 4'!
1 2 'Int 2'! 3 'Int 3'!
(9) 3
4
(9) 13
(7)
2 (7)(6)
9 (6)
(9)
2 (5) 7
10 (7)
7 (5)
(2) 1
2
2
(3)
(9)
(3)
(2)
5 (7)
4
3
3 (3)
3 4 (11)
(1)
(5)
(11)
(9) 3
13
3
8
DRB Maybank Residential Development TIS
Figure 3 - Project Trip Distribution and Assignment
Legend
xx AM Peak Hour Project Site Trips
(xx) PM Peak Hour Project Site Trips
St. Johns
Woods Parkway
Southwick Drive
25%
25% 50%
Maybank
Highway
Plaza Entrance
Cross Island
Extension
Cross Island
Extension
Project Driveway #1
Fern Hill Drive
Project
Site
Project
Site
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 6 April 2026
3 Traffic Volume Development
Existing 2025 traffic volumes were utilized in the analysis and future-year traffic volumes were
developed for projected 2028 traffic conditions. The future-year volumes consisted of the existing
traffic volumes adjusted by an annual growth rate, the projected traffic volumes of approved
nearby developments, and the projected traffic volumes generated by the DRB Maybank
Residential Development.
3.1 Existing Traffic Volumes
Intersection turning movement counts were conducted at the Maybank Highway intersections with
Southwick Drive and Fern Hill Drive during the AM peak period (7:00 AM to 9:00 AM) and PM
peak period (4:00 PM to 6:00 PM) on Wednesday, March 12, 2025.Intersection turning movement
counts were conducted at the intersection of Maybank Highway & St. Johns Woods Parkway
during the AM peak period (7:00 AM to 9:00 AM) and PM peak period (4:00 PM to 6:00 PM) on
Wednesday, October 22, 2025.
Figure 4 illustrates the 2025 Existing Peak-Hour traffic volumes. The raw turning-movement count
data is included in Appendix A.
3.2 No-Build Traffic Volume Development
Based upon the data from SCDOT count station 10-0267, Maybank Highway has experienced
approximately 2.7% annual growth in traffic over the past four years. Therefore, a 3.0% annual
growth rate was used to develop the background traffic for 2028 No-Build conditions. The growth
rate calculations are included in Appendix B.
In addition to the growth-rate adjusted traffic volumes, the approved development trips from the
Southwick Drive Residential Development TIA were also considered to develop the 2028 No-
Build peak-hour traffic volumes which are illustrated in Figure 5.
3.3 Build Traffic Volume Development
The DRB Maybank Residential Development project traffic volumes were added to the No-Build
traffic volumes to develop the Build traffic volumes for the future-year time period. With the new
roadway connections proposed as part of the DRB Maybank Residential Development, it was
assumed that 90% of the No-Build traffic volumes using Southwick Drive to access Maybank
Highway will use the new Cross Island Extension and Project Driveway #1 to access Maybank
Highway under Build conditions. The 2028 Build peak-hour traffic volumes are illustrated inFigure
6.
Worksheets documenting traffic volume development are provided in Appendix C.
DRAFT
1 'Int 2'! 3 'Int 3'!
6
4
(127) 22
(629) 348
(22) 13
99
14
102
87
(57)
(9)
(51)
32 (60)
(3)
(1)
3
1
(2) 1
(733) 500
(4)
761 (916)
1
22
(188)
653 (675)
14 (17)
732
19
(859)
(684) 451
(51)
(21)
5018
(11)
(1)
(22)
(18)
Legend
xx AM Peak Hour Traffic Volumes
(xx) PM Peak Hour Traffic Volumes
St. Johns
Woods Parkway
Maybank
Highway
Fern Hill Drive
Southwick Drive
Plaza Entrance
DRB Maybank Residential Development TIS
Figure 4 - 2025 Existing Peak-Hour Traffic Volumes
DRAFT
1 2 'Int 2'! 3 'Int 3'!
(972)
(66)
814
3515 (19)(12)
(1)
(24)
(155) 31
(687) 380
7
4
21
(24) 14
(73)
(10)
(78)
125
15
145
109 (238)
714 (738)
3
1
(2) 35
(3)
846 (1,034)
1 (4)
(1)
527
20
24 (823) 546
(23)
(769)
(20)
55(56)
Legend
xx AM Peak Hour Traffic Volumes
(xx) PM Peak Hour Traffic Volumes
St. Johns
Woods Parkway
Maybank
Highway
Fern Hill Drive
Southwick Drive
Plaza Entrance
DRB Maybank Residential Development TIS
Figure 5 - 2028 No-Build Peak-Hour Traffic Volumes
DRAFT
6 'Int 6'! 5 'Int 5'! 4 'Int 4'!
1 'Int 2'! 3 'Int 3'!
117 (317)
0 (0)
(157) 266
(13) 22
15
0
(12)
(1)
(24)
(34)
(0)
29
(6)
(1)
(6)
10
1
11
9
(28)
(14) 2
(837) 412
7
4
21
(24) 14
(19)
837 (811)
(0)
(81)
0
147
(4)4
24
(20) 20
(23)
(0)
(56)
103 (226)
717 (756)
32
461
0
55
(150)
(697)
(3)4 5
848
(2) 35
(832) 559
(6)7 (15)
(1,041)
(79)134
35 (66)
10
4
2
(11)
(7)
(0) 0
(5) 7
7 (5)
(0)0
(7) 2
(150) 264
110
2
(312)
(5)
(7)
DRB Maybank Residential Development TIS
Figure 6 - 2028 Build Peak-Hour Traffic Volumes
Maybank
Highway
Legend
xx AM Peak Hour Traffic Volumes
(xx) PM Peak Hour Traffic Volumes
St. Johns
Woods Parkway
Fern Hill Drive
Southwick Drive
Plaza Entrance
Cross Island
Extension
Cross Island
Extension
Project Driveway #1
Project
Site
Project
Site
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 10 April 2026
4 Traffic Signal Warrant Analysis
A traffic signal warrant analysis was conducted for the intersection of Maybank Highway & St.
Johns Woods Parkway/Project Driveway #1 in accordance with Part 4 of the Manual on Uniform
Traffic Control Devices (MUTCD). The MUTCD provides a total of nine traffic signal warrants ;
however, only Warrant 1 (Eight -Hour Vehicular Volume) and Warrant 2 (Four -Hour Vehicular
Volume) were considered in this analysis.
For the purposes of this analysis, the following assumption was considered:
⚫ The posted speed limit on Maybank Highway exceeds 40 mph; therefore, the 70%
reduction factors offered by the MUTCD were considered as part of the analysis.
⚫ The minor street right -turning movements were excluded to provide a conservative
analysis.
⚫ The traffic volumes considered for the signal warrant analysis include the existing traffic
volumes, project trips from the subject development, project trips from the Southwick Drive
TIA, and expected traffic diversion due to the new proposed roadway connections included
from the subject development. Projected background growth was excluded in the analysis.
Warrant 1 – Eight-Hour Vehicular Volume
Warrant 1 is described by the MUTCD as follows:
“The Minimum Vehicular Volume, Condition A, is intended for application at locations
where a large volume of intersecting traffic is the principal reason to consider installing a
traffic control signal.”
“The Interruption of Continuous Traffic, Condition B, is intended for application at locations
where Condition A is not satisfied and where the traffic volume on a major street is so
heavy that traffic on a minor intersecting street suffers excessive delay or conflict in
entering or crossing the major street.”
“It is intended that Warrant 1 be treated as a single warrant. If Condition A is satisfied,
then Warrant 1 is satisfied and analyses of Condition B and the combination of Conditions
A and B are not needed. Similarly, if Condition B is satisfied, then Warran t 1 is satisfied
and an analysis of the combination of Conditions A and B is not needed.”
The minimum hourly volumes needed to satisfy the criteria of Warrant 1, Condition A are 350
vehicles per hour (vph) on the major street approaches and 140 vph on the highest minor street
approach (for a two -lane approach) for each of any eight hours on an average day. For th is
analysis, the traffic volumes meet the criteria for Warrant 1, Condition A for three o f the eight
required hours, therefore Warrant 1, Condition A is not satisfied.
The minimum hourly volumes needed to satisfy the criteria of Warrant 1, Condition B are 525 vph
on the major street approaches and 70 vph on the highest minor street approach (for a two-lane
approach) for each of any eight hours on an average day. For this analysis, the traffic volumes
meet the criteria for Warrant 1, Condition B for 13 of the eight required hours, therefore Warrant
1, Condition B is satisfied, meaning Warrant 1 is satisfied.
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 11 April 2026
Warrant 2 – Four-Hour Vehicular Volume
Warrant 2 is described by the MUTCD as follows:
“The Four-Hour Vehicular Volume signal warrant conditions are intended to be applied
where the volume of intersecting traffic is the principal reason to consider installing a traffic
control signal.”
The criteria of Warrant 2 are satisfied if the major and minor street volumes plot above the
applicable curve in Figure 4C -2 within Part 4 of the MUTCD for each of any four hours of an
average day. For this analysis, the traffic volumes meet the criteria for Warrant 2 for 13 of the
eight required hours, therefore Warrant 2 is satisfied.
Summary
The traffic signal warrant analysis results are summarized in Table 2 and indicate that Warrant 1
and Warrant 2 are satisfied. The traffic signal warrant analysis worksheets are included in
Appendix D.
Table 2 – Traffic Signal Warrant Analysis Results Summary
MUTCD Traffic Signal Warrant Warrant Analysis Results
Warrant 1, Condition A Not Satisfied (3/8)
Warrant 1, Condition B Satisfied (13/8)
Warrant 2 Satisfied (13/8)
Based upon the results of the traffic signal warrant analysis, it is recommended to signalize the
intersection of Maybank Highway & St. Johns Woods Parkway/Project Driveway #1 prior to full
buildout of the development.
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 12 April 2026
5 Capacity Analysis
Capacity analyses were conducted under 2025 Existing conditions, 2028 No-Build conditions,
and 2028 Build conditions using theSynchro Version 12 software.Synchro utilizes methodologies
contained within the Highway Capacity Manual, 7th Edition (HCM7) to evaluate the level of service
(LOS) of an intersection under given geometric, traffic control, and traffic demand scenarios.
Auxiliary turn-lane warrant evaluations were conducted in accordance with guidelines identified
in the SCDOT Access and Roadside Management Standards manual and SCDOT Roadway
Design Manual.
Intersection LOS grades range from LOS A to LOS F, which are directly related to the level of
control delay at the intersection and characterize the operational conditions of the intersection
traffic flow. LOS A operations typically represent ideal, free-flow conditions where vehicles
experience little to no delays, and LOS F operations typically represent poor, gridlocked
conditions with high vehicular delays, and are generally considered undesirable.Table 3 lists the
LOS control delay thresholds published in HCM7 for signalized and unsignalized intersections.
Table 3 – HCM7 Level of Service Criteria
LOS
Control Delay per Vehicle (sec/veh)
Signalized Intersections Unsignalized Intersections
A ≤ 10 ≤ 10
B > 10 – 20 > 10 – 15
C > 20 – 35 > 15 – 25
D > 35 – 55 > 25 – 35
E > 55 – 80 > 35 – 50
F > 80 > 50
Existing peak hour factors (PHFs) and heavy vehicle percentages were utilized under 2025
Existing conditions with a minimum heavy vehicle percentage of 2% considered. For future-year
conditions, PHFs were limited to a maximum of 0.95.
The following sections outline the results of the capacity and turn lane analysis for each of the
study intersections. The capacity analysis worksheets are included in Appendix E.
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 13 April 2026
5.1 Maybank Highway & Southwick Drive
The installation of a traffic signal at the intersection of Maybank Highway & Southwick Drive was
recommended by the Southwick Drive Residential Development TIA and was considered to be in
place for the No-Build scenario. Based on coordination with the City of Charleston and traffic
signal warrant analysis, it is recommended to relocate the traffic signal to the intersection of
Maybank Highway & St. John’s Woods Parkway/Project Driveway #1 with the development of the
DRB Maybank Residential Development project.
The capacity analysis results for the Maybank Highway & Southwick Drive intersection are
summarized in Table 4 . The side-street approaches are expected to operate at undesirable
conditions during both peak periods under the Build scenario. However, these conditions are
common for unsignalized intersections along heavily traveled arterials such as Maybank Highway
and are projected to be an improvement over existing conditions. Therefore, no improvements
are recommended at this intersection.
Table 4 – Maybank Highway & Southwick Drive/Plaza Entrance Capacity Analysis Results
Condition Measure
Maybank
Highway
Maybank
Highway Plaza Entrance Southwick
Drive Intersection
EB WB NB SB
AM Peak Hour
2025 Existing LOS (Delay) A (9.6)* A (8.1)* C (19.3) F (138.0) -
2028 No-Build LOS (Delay) A (8.9) B (14.6) C (22.8) C (31.8) B (16.3)
2028 Build LOS (Delay) A (9.9)* A (8.4)* C (21.1) D (32.8) -
PM Peak Hour
2025 Existing LOS (Delay) B (11.0)* A (9.1)* F (54.2) F (385.4) -
2028 No-Build LOS (Delay) B (10.5) B (11.3) C (34.2) D (43.6) B (13.9)
2028 Build LOS (Delay) A (9.8)* B (10.1)* E (46.5) F (58.6) -
*Left-turn delay reported for major street approaches at unsignalized intersections.
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 14 April 2026
5.2 Maybank Highway & St. Johns Woods Parkway/Project Driveway #1
As previously noted, it is recommended to signalize the intersection of Maybank Highway & St.
John’s Woods Parkway/Project Driveway #1 with the development of the DRB Maybank
Residential Development project.
The capacity analysis results for the Maybank Highway & St. John’s Woods Parkway/Project
Driveway #1 intersection are summarized in Table 5. The intersection is expected to operate at
acceptable LOS conditions during both peak periods under the Build scenario. No further
improvements are recommended.
Table 5 – Maybank Highway & St. John’s Woods/Project Driveway #1 Parkway
Capacity Analysis Results
Condition Measure
Maybank
Highway
Maybank
Highway
St. Johns
Woods Parkway
Project
Driveway #1 Intersection
EB WB NB SB
AM Peak Hour
2025 Existing LOS (Delay) - A (8.5)* B (14.0) - -
2028 No-Build LOS (Delay) - A (8.8)* C (15.4) - -
2028 Build LOS (Delay) A (5.2) A (7.1) C (30.3) D (39.7) B (12.9)
PM Peak Hour
2025 Existing LOS (Delay) - A (9.4)* C (17.1) - -
2028 No-Build LOS (Delay) - A (9.9)* C (19.8) - -
2028 Build LOS (Delay) A (7.7) A (8.5) D (38.0) D (39.0) B (11.5)
*Left-turn delay reported for major street approaches at unsignalized intersections.
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 15 April 2026
5.3 Maybank Highway & Fern Hill Drive
The capacity analysis results for the Maybank Highway & Fern Hill Drive intersection are
summarized in Table 6 . The side-street approach currently operates at acceptable LOS
conditions and is projected to continue to operate at acceptable LOS conditions in future-year
scenarios. Therefore, no improvements are recommended.
Table 6 – Maybank Highway & Fern Hill Drive Capacity Analysis Results
Condition Measure Maybank Highway Fern Hill Drive
EB Left SB
AM Peak Hour
2025 Existing LOS (Delay) A (9.5) C (18.1)
2028 No-Build LOS (Delay) B (10.1) C (21.8)
2028 Build LOS (Delay) B (10.1) D (25.7)
PM Peak Hour
2025 Existing LOS (Delay) B (10.1) C (23.6)
2028 No-Build LOS (Delay) B (10.7) D (29.0)
2028 Build LOS (Delay) B (10.7) D (34.4)
5.4 Fern Hill Drive & Cross Island Extension
The capacity analysis results for the Fern Hill Drive & Cross Island Extension intersection are
summarized in Table 7, which indicates that the intersection is projected to operate at acceptable
conditions. Therefore, no improvements are recommended.
Table 7 – Fern Hill Drive & Cross Island Extension Capacity Analysis Results
Condition Measure
Cross Island Extension Fern Hill Drive
EB NB Left
AM Peak Hour
2028 Build LOS (Delay) A (8.4) A (7.2)
PM Peak Hour
2028 Build LOS (Delay) A (8.4) A (7.2)
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 16 April 2026
5.5 Cross Island Extension & Project Driveway #1
The capacity analysis results for the Cross Island Extension & Project Driveway #1 intersection
are summarized in Table 8 , which indicates that the intersection is projected to operate at
acceptable conditions. Therefore, no improvements are recommended.
Table 8 – Cross Island Extension & Project Driveway #1 Capacity Analysis Results
Condition Measure
Cross Island Extension Project Driveway #1
WB Left NB
AM Peak Hour
2028 Build LOS (Delay) A (7.9) B (10.3)
PM Peak Hour
2028 Build LOS (Delay) A (7.6) B (11.8)
5.6 Cross Island Extension & Southwick Drive
The capacity analysis results for the Southwick Drive & Cross Island Extension intersection are
summarized in Table 9, which indicates that the intersection is projected to operate at acceptable
conditions. Therefore, no improvements are recommended.
Table 9 – Southwick Drive at Cross Island Extension Analysis Results
Condition Measure
Southwick Drive
NB
AM Peak Hour
2028 Build LOS (Delay) B (11.4)
PM Peak Hour
2028 Build LOS (Delay) B (12.7)
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Page 17 April 2026
6 Conclusion
The purpose of this TIS is to review the vehicular traffic impacts of the proposed DRB Maybank
Residential Development in the City of Charleston, South Carolina. The proposed development
is located on the north side of Maybank Highway between Southwick Drive and Fernhill Drive.
The development is expected to consist of up to 38 single-family detached and 38 single-family
attached dwelling units. The development will access the roadway network via one full-access
driveway along Maybank Road that aligns with St. Johns Woods Parkway and a new roadway
connecting Southwick Drive and Fern Hill Drive referred to as Cross Island Extension in this study.
This TIS evaluates traffic operations under 2025 Existing and 2028 horizon conditions in
accordance with SCDOT guidelines. The following improvements are recommended based on
the results of the traffic analysis.
Maybank Highway & St. Johns Woods Parkway/Project Driveway #1
· Signalize the intersection.
· Construct Project Driveway #1 with a shared through/left-turn lane and a dedicated right-
turn lane with 200 feet of full-width storage and 145 feet of taper.
· Re-mark the Maybank Highway two-way left-turn to consist of dedicated eastbound left-
turn lane with 150 feet of full-width storage and 180 feet of taper.
Cross Island Extension & Southwick Drive
· Southwick Drive to operate with stop-sign control.
Cross Island Extension & Project Driveway #1
· Project Driveway #1 to operate with stop-sign control.
Fern Hill Drive & Cross Island Extension
· Cross Island Extension to operate with stop-sign control.
Recommended roadway geometry and intersection control improvements are illustrated in
Figure 7.
DRAFT
6 'Int 6'! 5 'Int 5'! 4 'Int 4'!
1 'Int 2'! 3 'Int 3'!
DRB Maybank Residential Development TIS
Figure 7 - Recommended Geometry and Traffic Control
Maybank
Highway
St. Johns
Woods Parkway
Fern Hill Drive
Southwick Drive
Plaza Entrance
Cross Island
Extension
Cross Island
Extension
Project Driveway #1
Project
Site
Project
Site
S = 250'
S = 150'
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Appendix A – Turning Movement Counts
DRAFT
File Name : Maybank Hwy @ Southwick Dr
Site Code :
Start Date : 03/12/2025
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Southwick Dr
Southbound
Maybank Hwy
Westbound
Access Rd
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 22 1 22 0 1 118 10 0 4 3 2 0 9 84 0 0 276
07:15 32 1 23 0 5 139 16 0 3 0 1 1 10 73 1 0 305
07:30 31 2 37 0 4 155 24 0 0 0 3 1 3 59 2 0 321
07:45 36 1 36 0 2 154 20 0 1 3 4 0 4 77 4 0 342
Total 121 5 118 0 12 566 70 0 8 6 10 2 26 293 7 0 1244
08:00 14 6 22 0 5 143 19 0 2 0 4 0 7 80 3 0 305
08:15 18 4 21 0 3 134 27 0 0 1 6 0 4 80 3 0 301
08:30 34 3 20 0 4 165 21 0 3 0 5 0 7 82 3 0 347
08:45 24 3 15 1 11 129 16 0 1 2 5 2 3 112 3 0 327
Total 90 16 78 1 23 571 83 0 6 3 20 2 21 354 12 0 1280
16:00 14 2 15 0 6 195 51 0 0 0 8 0 28 165 4 0 488
16:15 9 2 12 0 3 170 41 0 1 0 7 1 31 165 6 0 448
16:30 10 2 10 0 3 173 42 0 5 1 2 6 33 148 7 0 442
16:45 18 3 20 0 5 137 54 0 5 0 5 4 35 151 5 0 442
Total 51 9 57 0 17 675 188 0 11 1 22 11 127 629 22 0 1820
17:00 20 3 18 0 3 145 46 0 2 1 3 0 35 161 4 0 441
17:15 13 2 12 0 3 182 36 0 2 5 5 1 31 142 7 0 441
17:30 11 1 10 0 8 143 49 0 2 2 7 3 25 124 3 0 388
17:45 13 1 19 0 8 133 44 0 4 5 7 1 16 151 7 0 409
Total 57 7 59 0 22 603 175 0 10 13 22 5 107 578 21 0 1679
Grand Total 319 37 312 1 74 2415 516 0 35 23 74 20 281 1854 62 0 6023
Apprch % 47.7 5.5 46.6 0.1 2.5 80.4 17.2 0 23 15.1 48.7 13.2 12.8 84.4 2.8 0
Total % 5.3 0.6 5.2 0 1.2 40.1 8.6 0 0.6 0.4 1.2 0.3 4.7 30.8 1 0
Passenger Vehicles 319 37 309 1 74 2364 510 0 35 23 74 20 276 1824 62 0 5928
% Passenger Vehicles 100 100 99 100 100 97.9 98.8 0 100 100 100 100 98.2 98.4 100 0 98.4
Heavy Vehicles 0 0 1 0 0 38 3 0 0 0 0 0 4 22 0 0 68
% Heavy Vehicles 0 0 0.3 0 0 1.6 0.6 0 0 0 0 0 1.4 1.2 0 0 1.1
Buses 0 0 2 0 0 13 3 0 0 0 0 0 1 8 0 0 27
% Buses 0 0 0.6 0 0 0.5 0.6 0 0 0 0 0 0.4 0.4 0 0 0.4
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Southwick Dr
Site Code :
Start Date : 03/12/2025
Page No : 2
Southwick Dr
Maybank Hwy
Maybank Hwy
Access Rd
Right
309
1
2
312
Thru
37
0
0
37
Left
319
0
0
319
Peds
1
0
0
1
InOut Total
809 666 1475
7 1 8
4 2 6
820 1489 669
Right
510
3
3
516
Thru
2364
38
13
2415
Left
74
0
0
74
Peds
0
0
0
0
OutTotal In
2217 2948 5165
22 41 63
8 16 24
2247 5252 3005
Left
35
0
0
35
Thru
23
0
0
23
Right
74
0
0
74
Peds
20
0
0
20
Out TotalIn
173 152 325
0 0 0
0 0 0
173 325 152
Left
276
4
1
281
Thru
1824
22
8
1854
Right
62
0
0
62
Peds
0
0
0
0
TotalOut In
2708 2162 4870
39 26 65
15 9 24
2762 4959 2197
03/12/2025 07:00
03/12/2025 17:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Southwick Dr
Site Code :
Start Date : 03/12/2025
Page No : 3
Southwick Dr
Southbound
Maybank Hwy
Westbound
Access Rd
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 07:45
07:45 36 1 36 0 73 2 154 20 0 176 1 3 4 0 8 4 77 4 0 85 342
08:00 14 6 22 0 42 5 143 19 0 167 2 0 4 0 6 7 80 3 0 90 305
08:15 18 4 21 0 43 3 134 27 0 164 0 1 6 0 7 4 80 3 0 87 301
08:30 34 3 20 0 57 4 165 21 0 190 3 0 5 0 8 7 82 3 0 92 347
Total Volume 102 14 99 0 215 14 596 87 0 697 6 4 19 0 29 22 319 13 0 354 1295
% App. Total 47.4 6.5 46 0 2 85.5 12.5 0 20.7 13.8 65.5 0 6.2 90.1 3.7 0
PHF .708 .583 .688 .000 .736 .700 .903 .806 .000 .917 .500 .333 .792 .000 .906 .786 .973 .813 .000 .962 .933
Passenger Vehicles 102 14 98 0 214 14 575 85 0 674 6 4 19 0 29 21 307 13 0 341 1258
% Passenger Vehicles
Heavy Vehicles 0 0 1 0 1 0 17 1 0 18 0 0 0 0 0 1 10 0 0 11 30
% Heavy Vehicles 0 0 1.0 0 0.5 0 2.9 1.1 0 2.6 0 0 0 0 0 4.5 3.1 0 0 3.1 2.3
Buses 0 0 0 0 0 0 4 1 0 5 0 0 0 0 0 0 2 0 0 2 7
% Buses 0 0 0 0 0 0 0.7 1.1 0 0.7 0 0 0 0 0 0 0.6 0 0 0.6 0.5
Southwick Dr
Maybank Hwy
Maybank Hwy
Access Rd
Right
98
1
0
99
Thru
14
0
0
14
Left
102
0
0
102
Peds
0
0
0
0
InOut Total
110 214 324
2 1 3
1 0 1
113 328 215
Right
85
1
1
87
Thru
575
17
4
596
Left
14
0
0
14
Peds
0
0
0
0
OutTotal In
428 674 1102
10 18 28
2 5 7
440 1137 697
Left
6
0
0
6
Thru
4
0
0
4
Right
19
0
0
19
Peds
0
0
0
0
Out TotalIn
41 29 70
0 0 0
0 0 0
41 70 29
Left
21
1
0
22
Thru
307
10
2
319
Right
13
0
0
13
Peds
0
0
0
0
TotalOut In
679 341 1020
18 11 29
4 2 6
701 1055 354
Peak Hour Begins at 07:45
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Southwick Dr
Site Code :
Start Date : 03/12/2025
Page No : 4
Southwick Dr
Southbound
Maybank Hwy
Westbound
Access Rd
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 16:00
16:00 14 2 15 0 31 6 195 51 0 252 0 0 8 0 8 28 165 4 0 197 488
16:15 9 2 12 0 23 3 170 41 0 214 1 0 7 1 9 31 165 6 0 202 448
16:30 10 2 10 0 22 3 173 42 0 218 5 1 2 6 14 33 148 7 0 188 442
16:45 18 3 20 0 41 5 137 54 0 196 5 0 5 4 14 35 151 5 0 191 442
Total Volume 51 9 57 0 117 17 675 188 0 880 11 1 22 11 45 127 629 22 0 778 1820
% App. Total 43.6 7.7 48.7 0 1.9 76.7 21.4 0 24.4 2.2 48.9 24.4 16.3 80.8 2.8 0
PHF .708 .750 .713 .000 .713 .708 .865 .870 .000 .873 .550 .250 .688 .458 .804 .907 .953 .786 .000 .963 .932
Passenger Vehicles 51 9 56 0 116 17 665 185 0 867 11 1 22 11 45 124 623 22 0 769 1797
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 3 2 0 5 0 0 0 0 0 3 5 0 0 8 13
% Heavy Vehicles 0 0 0 0 0 0 0.4 1.1 0 0.6 0 0 0 0 0 2.4 0.8 0 0 1.0 0.7
Buses 0 0 1 0 1 0 7 1 0 8 0 0 0 0 0 0 1 0 0 1 10
% Buses 0 0 1.8 0 0.9 0 1.0 0.5 0 0.9 0 0 0 0 0 0 0.2 0 0 0.1 0.5
Southwick Dr
Maybank Hwy
Maybank Hwy
Access Rd
Right
56
0
1
57
Thru
9
0
0
9
Left
51
0
0
51
Peds
0
0
0
0
InOut Total
310 116 426
5 0 5
1 1 2
316 433 117
Right
185
2
1
188
Thru
665
3
7
675
Left
17
0
0
17
Peds
0
0
0
0
OutTotal In
696 867 1563
5 5 10
1 8 9
702 1582 880
Left
11
0
0
11
Thru
1
0
0
1
Right
22
0
0
22
Peds
11
0
0
11
Out TotalIn
48 45 93
0 0 0
0 0 0
48 93 45
Left
124
3
0
127
Thru
623
5
1
629
Right
22
0
0
22
Peds
0
0
0
0
TotalOut In
732 769 1501
3 8 11
8 1 9
743 1521 778
Peak Hour Begins at 16:00
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ St Johns Woods Pkwy
Site Code :
Start Date : 10/22/2025
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Southbound
Maybank Hwy
Westbound
St Johns Woods Pkwy
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 0 0 0 0 3 134 0 0 2 0 18 0 0 116 2 0 275
07:15 0 0 0 0 3 166 0 0 4 0 4 0 0 136 2 0 315
07:30 0 0 0 0 4 179 0 0 1 0 10 0 0 85 1 0 280
07:45 0 0 0 0 4 195 0 0 4 0 10 0 0 103 2 0 318
Total 0 0 0 0 14 674 0 0 11 0 42 0 0 440 7 0 1188
08:00 0 0 0 0 10 167 0 0 9 0 14 0 0 91 2 0 293
08:15 0 0 0 0 8 192 0 0 2 0 8 1 0 107 6 0 324
08:30 0 0 0 0 6 194 0 0 6 0 12 0 0 129 7 0 354
08:45 0 0 0 0 8 179 0 0 5 0 16 0 0 124 3 0 335
Total 0 0 0 0 32 732 0 0 22 0 50 1 0 451 18 0 1306
16:00 0 0 0 0 11 180 0 0 8 0 11 0 0 207 4 0 421
16:15 0 0 0 0 17 172 0 0 3 0 8 0 0 172 9 0 381
16:30 0 0 0 0 19 170 0 0 3 0 27 0 0 157 6 0 382
16:45 0 0 0 0 21 212 0 0 6 0 5 0 0 152 2 0 398
Total 0 0 0 0 68 734 0 0 20 0 51 0 0 688 21 0 1582
17:00 0 0 0 0 13 210 0 0 3 0 11 0 0 166 6 0 409
17:15 0 0 0 0 7 206 0 0 9 0 8 0 0 166 4 0 400
17:30 0 0 0 0 8 179 0 0 1 0 7 0 0 156 6 0 357
17:45 0 0 0 0 14 189 0 0 6 0 3 0 0 147 2 0 361
Total 0 0 0 0 42 784 0 0 19 0 29 0 0 635 18 0 1527
Grand Total 0 0 0 0 156 2924 0 0 72 0 172 1 0 2214 64 0 5603
Apprch % 0 0 0 0 5.1 94.9 0 0 29.4 0 70.2 0.4 0 97.2 2.8 0
Total % 0 0 0 0 2.8 52.2 0 0 1.3 0 3.1 0 0 39.5 1.1 0
Passenger Vehicles 0 0 0 0 156 2855 0 0 71 0 171 1 0 2166 64 0 5484
% Passenger Vehicles 0 0 0 0 100 97.6 0 0 98.6 0 99.4 100 0 97.8 100 0 97.9
Heavy Vehicles 0 0 0 0 0 54 0 0 1 0 0 0 0 40 0 0 95
% Heavy Vehicles 0 0 0 0 0 1.8 0 0 1.4 0 0 0 0 1.8 0 0 1.7
Buses 0 0 0 0 0 15 0 0 0 0 1 0 0 8 0 0 24
% Buses 0 0 0 0 0 0.5 0 0 0 0 0.6 0 0 0.4 0 0 0.4
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ St Johns Woods Pkwy
Site Code :
Start Date : 10/22/2025
Page No : 2
Maybank Hwy
Maybank Hwy
St Johns Woods Pkwy
Right
0
0
0
0
Thru
0
0
0
0
Left
0
0
0
0
Peds
0
0
0
0
InOut Total
0 0 0
0 0 0
0 0 0
0 0 0
Right
0
0
0
0
Thru
2855
54
15
2924
Left
156
0
0
156
Peds
0
0
0
0
OutTotal In
2337 3011 5348
40 54 94
9 15 24
2386 5466 3080
Left
71
1
0
72
Thru
0
0
0
0
Right
171
0
1
172
Peds
1
0
0
1
Out TotalIn
220 243 463
0 1 1
0 1 1
220 465 245
Left
0
0
0
0
Thru
2166
40
8
2214
Right
64
0
0
64
Peds
0
0
0
0
TotalOut In
2926 2230 5156
55 40 95
15 8 23
2996 5274 2278
10/22/2025 07:00
10/22/2025 17:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ St Johns Woods Pkwy
Site Code :
Start Date : 10/22/2025
Page No : 3
Southbound
Maybank Hwy
Westbound
St Johns Woods Pkwy
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00
08:00 0 0 0 0 0 10 167 0 0 177 9 0 14 0 23 0 91 2 0 93 293
08:15 0 0 0 0 0 8 192 0 0 200 2 0 8 1 11 0 107 6 0 113 324
08:30 0 0 0 0 0 6 194 0 0 200 6 0 12 0 18 0 129 7 0 136 354
08:45 0 0 0 0 0 8 179 0 0 187 5 0 16 0 21 0 124 3 0 127 335
Total Volume 0 0 0 0 0 32 732 0 0 764 22 0 50 1 73 0 451 18 0 469 1306
% App. Total 0 0 0 0 4.2 95.8 0 0 30.1 0 68.5 1.4 0 96.2 3.8 0
PHF .000 .000 .000 .000 .000 .800 .943 .000 .000 .955 .611 .000 .781 .250 .793 .000 .874 .643 .000 .862 .922
Passenger Vehicles 0 0 0 0 0 32 704 0 0 736 22 0 50 1 73 0 439 18 0 457 1266
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 23 0 0 23 0 0 0 0 0 0 12 0 0 12 35
% Heavy Vehicles 0 0 0 0 0 0 3.1 0 0 3.0 0 0 0 0 0 0 2.7 0 0 2.6 2.7
Buses 0 0 0 0 0 0 5 0 0 5 0 0 0 0 0 0 0 0 0 0 5
% Buses 0 0 0 0 0 0 0.7 0 0 0.7 0 0 0 0 0 0 0 0 0 0 0.4
Maybank Hwy
Maybank Hwy
St Johns Woods Pkwy
Right
0
0
0
0
Thru
0
0
0
0
Left
0
0
0
0
Peds
0
0
0
0
InOut Total
0 0 0
0 0 0
0 0 0
0 0 0
Right
0
0
0
0
Thru
704
23
5
732
Left
32
0
0
32
Peds
0
0
0
0
OutTotal In
489 736 1225
12 23 35
0 5 5
501 1265 764
Left
22
0
0
22
Thru
0
0
0
0
Right
50
0
0
50
Peds
1
0
0
1
Out TotalIn
50 73 123
0 0 0
0 0 0
50 123 73
Left
0
0
0
0
Thru
439
12
0
451
Right
18
0
0
18
Peds
0
0
0
0
TotalOut In
726 457 1183
23 12 35
5 0 5
754 1223 469
Peak Hour Begins at 08:00
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ St Johns Woods Pkwy
Site Code :
Start Date : 10/22/2025
Page No : 4
Southbound
Maybank Hwy
Westbound
St Johns Woods Pkwy
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 16:30
16:30 0 0 0 0 0 19 170 0 0 189 3 0 27 0 30 0 157 6 0 163 382
16:45 0 0 0 0 0 21 212 0 0 233 6 0 5 0 11 0 152 2 0 154 398
17:00 0 0 0 0 0 13 210 0 0 223 3 0 11 0 14 0 166 6 0 172 409
17:15 0 0 0 0 0 7 206 0 0 213 9 0 8 0 17 0 166 4 0 170 400
Total Volume 0 0 0 0 0 60 798 0 0 858 21 0 51 0 72 0 641 18 0 659 1589
% App. Total 0 0 0 0 7 93 0 0 29.2 0 70.8 0 0 97.3 2.7 0
PHF .000 .000 .000 .000 .000 .714 .941 .000 .000 .921 .583 .000 .472 .000 .600 .000 .965 .750 .000 .958 .971
Passenger Vehicles 0 0 0 0 0 60 793 0 0 853 21 0 51 0 72 0 634 18 0 652 1577
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 9
% Heavy Vehicles 0 0 0 0 0 0 0.3 0 0 0.2 0 0 0 0 0 0 1.1 0 0 1.1 0.6
Buses 0 0 0 0 0 0 3 0 0 3 0 0 0 0 0 0 0 0 0 0 3
% Buses 0 0 0 0 0 0 0.4 0 0 0.3 0 0 0 0 0 0 0 0 0 0 0.2
Maybank Hwy
Maybank Hwy
St Johns Woods Pkwy
Right
0
0
0
0
Thru
0
0
0
0
Left
0
0
0
0
Peds
0
0
0
0
InOut Total
0 0 0
0 0 0
0 0 0
0 0 0
Right
0
0
0
0
Thru
793
2
3
798
Left
60
0
0
60
Peds
0
0
0
0
OutTotal In
685 853 1538
7 2 9
0 3 3
692 1550 858
Left
21
0
0
21
Thru
0
0
0
0
Right
51
0
0
51
Peds
0
0
0
0
Out TotalIn
78 72 150
0 0 0
0 0 0
78 150 72
Left
0
0
0
0
Thru
634
7
0
641
Right
18
0
0
18
Peds
0
0
0
0
TotalOut In
814 652 1466
2 7 9
3 0 3
819 1478 659
Peak Hour Begins at 16:30
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Fern Hill Dr
Site Code :
Start Date : 03/12/2025
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Fern Hill Dr
Southbound
Maybank Hwy
Westbound Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
07:00 1 0 0 0 0 121 0 0 0 0 0 0 0 119 0 0 241
07:15 0 0 1 0 1 160 0 0 0 0 0 0 0 109 0 0 271
07:30 1 0 1 0 0 183 0 0 0 0 0 0 0 100 0 0 285
07:45 0 0 0 0 0 174 0 0 0 0 0 0 0 119 0 0 293
Total 2 0 2 0 1 638 0 0 0 0 0 0 0 447 0 0 1090
08:00 0 0 1 0 0 162 1 0 0 0 0 0 0 101 0 0 265
08:15 0 0 0 0 0 173 0 0 0 0 0 0 0 105 1 0 279
08:30 1 0 2 0 0 188 0 0 0 0 0 0 1 118 2 0 312
08:45 0 0 0 1 0 160 0 0 0 0 0 0 0 137 0 0 298
Total 1 0 3 1 0 683 1 0 0 0 0 0 1 461 3 0 1154
16:00 0 0 0 0 0 254 1 0 0 0 0 0 0 178 1 0 434
16:15 1 0 1 0 1 214 1 0 0 0 0 0 0 183 0 0 401
16:30 0 0 0 0 0 237 1 0 0 0 0 0 1 173 0 0 412
16:45 0 0 1 1 0 211 1 0 0 0 0 0 1 179 1 0 395
Total 1 0 2 1 1 916 4 0 0 0 0 0 2 713 2 0 1642
17:00 0 0 0 0 2 210 2 0 0 0 0 0 3 192 0 0 409
17:15 1 0 1 0 0 228 2 0 0 0 0 0 5 160 1 0 398
17:30 0 0 4 0 0 207 0 0 0 0 0 0 1 147 1 0 360
17:45 1 0 1 0 0 189 1 0 0 0 0 0 2 179 1 0 374
Total 2 0 6 0 2 834 5 0 0 0 0 0 11 678 3 0 1541
Grand Total 6 0 13 2 4 3071 10 0 0 0 0 0 14 2299 8 0 5427
Apprch % 28.6 0 61.9 9.5 0.1 99.5 0.3 0 0 0 0 0 0.6 99.1 0.3 0
Total % 0.1 0 0.2 0 0.1 56.6 0.2 0 0 0 0 0 0.3 42.4 0.1 0
Passenger Vehicles 6 0 13 2 4 3015 10 0 0 0 0 0 14 2268 8 0 5340
% Passenger Vehicles 100 0 100 100 100 98.2 100 0 0 0 0 0 100 98.7 100 0 98.4
Heavy Vehicles 0 0 0 0 0 38 0 0 0 0 0 0 0 22 0 0 60
% Heavy Vehicles 0 0 0 0 0 1.2 0 0 0 0 0 0 0 1 0 0 1.1
Buses 0 0 0 0 0 18 0 0 0 0 0 0 0 9 0 0 27
% Buses 0 0 0 0 0 0.6 0 0 0 0 0 0 0 0.4 0 0 0.5
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Fern Hill Dr
Site Code :
Start Date : 03/12/2025
Page No : 2
Fern Hill Dr
Maybank Hwy
Maybank Hwy
Right
13
0
0
13
Thru
0
0
0
0
Left
6
0
0
6
Peds
2
0
0
2
InOut Total
24 21 45
0 0 0
0 0 0
24 45 21
Right
10
0
0
10
Thru
3015
38
18
3071
Left
4
0
0
4
Peds
0
0
0
0
OutTotal In
2274 3029 5303
22 38 60
9 18 27
2305 5390 3085
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
12 0 12
0 0 0
0 0 0
12 12 0
Left
14
0
0
14
Thru
2268
22
9
2299
Right
8
0
0
8
Peds
0
0
0
0
TotalOut In
3028 2290 5318
38 22 60
18 9 27
3084 5405 2321
03/12/2025 07:00
03/12/2025 17:45
Passenger Vehicles
Heavy Vehicles
Buses
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Fern Hill Dr
Site Code :
Start Date : 03/12/2025
Page No : 3
Fern Hill Dr
Southbound
Maybank Hwy
Westbound Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 07:00 to 08:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 08:00
08:00 0 0 1 0 1 0 162 1 0 163 0 0 0 0 0 0 101 0 0 101 265
08:15 0 0 0 0 0 0 173 0 0 173 0 0 0 0 0 0 105 1 0 106 279
08:30 1 0 2 0 3 0 188 0 0 188 0 0 0 0 0 1 118 2 0 121 312
08:45 0 0 0 1 1 0 160 0 0 160 0 0 0 0 0 0 137 0 0 137 298
Total Volume 1 0 3 1 5 0 683 1 0 684 0 0 0 0 0 1 461 3 0 465 1154
% App. Total 20 0 60 20 0 99.9 0.1 0 0 0 0 0 0.2 99.1 0.6 0
PHF .250 .000 .375 .250 .417 .000 .908 .250 .000 .910 .000 .000 .000 .000 .000 .250 .841 .375 .000 .849 .925
Passenger Vehicles 1 0 3 1 5 0 663 1 0 664 0 0 0 0 0 1 455 3 0 459 1128
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 16 0 0 16 0 0 0 0 0 0 5 0 0 5 21
% Heavy Vehicles 0 0 0 0 0 0 2.3 0 0 2.3 0 0 0 0 0 0 1.1 0 0 1.1 1.8
Buses 0 0 0 0 0 0 4 0 0 4 0 0 0 0 0 0 1 0 0 1 5
% Buses 0 0 0 0 0 0 0.6 0 0 0.6 0 0 0 0 0 0 0.2 0 0 0.2 0.4
Fern Hill Dr
Maybank Hwy
Maybank Hwy
Right
3
0
0
3
Thru
0
0
0
0
Left
1
0
0
1
Peds
1
0
0
1
InOut Total
2 5 7
0 0 0
0 0 0
2 7 5
Right
1
0
0
1
Thru
663
16
4
683
Left
0
0
0
0
Peds
0
0
0
0
OutTotal In
456 664 1120
5 16 21
1 4 5
462 1146 684
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
3 0 3
0 0 0
0 0 0
3 3 0
Left
1
0
0
1
Thru
455
5
1
461
Right
3
0
0
3
Peds
0
0
0
0
TotalOut In
666 459 1125
16 5 21
4 1 5
686 1151 465
Peak Hour Begins at 08:00
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ Fern Hill Dr
Site Code :
Start Date : 03/12/2025
Page No : 4
Fern Hill Dr
Southbound
Maybank Hwy
Westbound Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Left Thru Right Peds App. Total Int. Total
Peak Hour Analysis From 16:00 to 17:45 - Peak 1 of 1
Peak Hour for Entire Intersection Begins at 16:00
16:00 0 0 0 0 0 0 254 1 0 255 0 0 0 0 0 0 178 1 0 179 434
16:15 1 0 1 0 2 1 214 1 0 216 0 0 0 0 0 0 183 0 0 183 401
16:30 0 0 0 0 0 0 237 1 0 238 0 0 0 0 0 1 173 0 0 174 412
16:45 0 0 1 1 2 0 211 1 0 212 0 0 0 0 0 1 179 1 0 181 395
Total Volume 1 0 2 1 4 1 916 4 0 921 0 0 0 0 0 2 713 2 0 717 1642
% App. Total 25 0 50 25 0.1 99.5 0.4 0 0 0 0 0 0.3 99.4 0.3 0
PHF .250 .000 .500 .250 .500 .250 .902 1.00 .000 .903 .000 .000 .000 .000 .000 .500 .974 .500 .000 .980 .946
Passenger Vehicles 1 0 2 1 4 1 905 4 0 910 0 0 0 0 0 2 705 2 0 709 1623
% Passenger Vehicles
Heavy Vehicles 0 0 0 0 0 0 2 0 0 2 0 0 0 0 0 0 7 0 0 7 9
% Heavy Vehicles 0 0 0 0 0 0 0.2 0 0 0.2 0 0 0 0 0 0 1.0 0 0 1.0 0.5
Buses 0 0 0 0 0 0 9 0 0 9 0 0 0 0 0 0 1 0 0 1 10
% Buses 0 0 0 0 0 0 1.0 0 0 1.0 0 0 0 0 0 0 0.1 0 0 0.1 0.6
Fern Hill Dr
Maybank Hwy
Maybank Hwy
Right
2
0
0
2
Thru
0
0
0
0
Left
1
0
0
1
Peds
1
0
0
1
InOut Total
6 4 10
0 0 0
0 0 0
6 10 4
Right
4
0
0
4
Thru
905
2
9
916
Left
1
0
0
1
Peds
0
0
0
0
OutTotal In
706 910 1616
7 2 9
1 9 10
714 1635 921
Left
0
0
0
0
Thru
0
0
0
0
Right
0
0
0
0
Peds
0
0
0
0
Out TotalIn
3 0 3
0 0 0
0 0 0
3 3 0
Left
2
0
0
2
Thru
705
7
1
713
Right
2
0
0
2
Peds
0
0
0
0
TotalOut In
907 709 1616
2 7 9
9 1 10
918 1635 717
Peak Hour Begins at 16:00
Passenger Vehicles
Heavy Vehicles
Buses
Peak Hour Data
North
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Appendix B – Historic Growth Rate Data
DRAFT
Growth
2021 2022 2023 2024 4-Year Growth (%)
10-0267 SC700 : S- 20 (MAIN RD) TO S- 54 (RIVER RD), S- 91 17700 18500 19400 19200 2.7%
Station ID Location
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Appendix C – Volume Development Worksheets
DRAFT
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Maybank Highway at Southwick Drive
AM 2025 EXISTING TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Adjusted Turning Movement Counts 1 0 22 319 13 14 596 87 6 4 19 102 14 99
AM Volume Balancing 0 0 29 0 0 57 0 0 0 0 0 0 0
AM 2025 EXISTING TRAFFIC 0 22 348 13 14 653 87 6 4 19 102 14 99
AM Heavy Vehicle Percentage 2% 5% 4% 2% 2% 4% 2% 2% 2% 2% 2% 2% 2%
AM 2028 NO-BUILD TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
AM 2028 NO-BUILD TRAFFIC GROWTH 0 2 32 1 1 61 8 1 0 2 9 1 9
AM 2028 NO-BUILD TRAFFIC (No AD) 0 24 380 14 15 714 95 7 4 21 111 15 108
7 14 34 17
TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 7 0 0 0 0 14 0 0 0 34 0 17
AM 2028 NO-BUILD TRAFFIC 0 31 380 14 15 714 109 7 4 21 145 15 125
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 25%
Distribution Exiting 25%
"AM PROJECT TRIPS"
LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 0 3 0 0 8 0 0 0 0 0 0 0
AM TOTAL PROJECT TRIPS 0 0 3 0 0 8 0 0 0 0 0 0 0
-22 22 14 98 -86 -100 -14 -98
-7 7 17 -14 -34 -17
AM 2028 BUILD-OUT TRAFFIC 0 2 412 14 29 837 9 7 4 21 11 1 10
PM 2025 EXISTING TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
PM Adjusted Turning Movement Counts 1 0 127 629 22 17 675 188 11 1 22 51 9 57
PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0 0
PM 2025 EXISTING TRAFFIC 0 127 629 22 17 675 188 11 1 22 51 9 57
PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
PM 2028 NO-BUILD TRAFFIC EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PM 2028 NO-BUILD TRAFFIC GROWTH 0 12 58 2 2 63 17 1 0 2 5 1 5
PM 2028 NO-BUILD TRAFFIC (No AD) 0 139 687 24 19 738 205 12 1 24 56 10 62
16 33 22 11
TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 16 0 0 0 0 33 0 0 0 22 0 11
PM 2028 NO-BUILD TRAFFIC 0 155 687 24 19 738 238 12 1 24 78 10 73
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 25%
Distribution Exiting 25%
"PM PROJECT TRIPS"
LAND USE TYPE EBU EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 0 9 0 0 6 0 0 0 0 0 0 0
PM TOTAL PROJECT TRIPS 0 0 9 0 0 6 0 0 0 0 0 0 0
-125 125 9 56 -186 -50 -9 -56
-16 16 11 -33 -22 -11
PM 2028 BUILD-OUT TRAFFIC 0 14 837 24 28 811 19 12 1 24 6 1 6
Approved Development 1: Southwick Drive TIA
AM Peak Hour
Project Trip
PM Peak Hour
Approved Development 1: Southwick Drive TIA
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Project Trip
DRAFT
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Maybank Highway at St. John's Woods Parkway
AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Adjusted Turning Movement Counts 1 0 451 18 32 732 0 22 0 50 0 0 0
AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0
AM 2025 EXISTING TRAFFIC 0 451 18 32 732 0 22 0 50 0 0 0
AM Heavy Vehicle Percentage 2% 3% 2% 2% 4% 2% 2% 2% 2% 2% 2% 2%
AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
AM 2028 NO-BUILD TRAFFIC GROWTH 0 42 2 3 68 0 2 0 5 0 0 0
AM 2028 NO-BUILD TRAFFIC (No AD) 0 493 20 35 800 0 24 0 55 0 0 0
34 14
TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 34 0 0 14 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC 0 527 20 35 814 0 24 0 55 0 0 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 25% 20%
Distribution Exiting 10% 40% 15%
"AM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 3 0 0 0 3 3 0 0 0 13 0 5
AM TOTAL PROJECT TRIPS 3 0 0 0 3 3 0 0 0 13 0 5
22 -100 -86 86 100 112
7 34 -14 14 34 17
AM 2028 BUILD-OUT TRAFFIC 32 461 20 35 717 103 24 0 55 147 0 134
PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
PM Adjusted Turning Movement Counts 1 0 641 18 60 798 0 21 0 51 0 0 0
PM Volume Balancing 0 43 0 0 61 0 0 0 0 0 0 0
PM 2025 EXISTING TRAFFIC 0 684 18 60 859 0 21 0 51 0 0 0
PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PM 2028 NO-BUILD TRAFFIC GROWTH 0 63 2 6 80 0 2 0 5 0 0 0
PM 2028 NO-BUILD TRAFFIC (No AD) 0 747 20 66 939 0 23 0 56 0 0 0
22 33
TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 22 0 0 33 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC 0 769 20 66 972 0 23 0 56 0 0 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 25% 20%
Distribution Exiting 10% 40% 15%
"PM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 9 0 0 0 3 7 0 0 0 9 0 3
PM TOTAL PROJECT TRIPS 9 0 0 0 3 7 0 0 0 9 0 3
125 -50 -186 186 50 65
16 -22 -33 33 22 11
PM 2028 BUILD-OUT TRAFFIC 150 697 20 66 756 226 23 0 56 81 0 79
Project Trip
AM Peak Hour
Approved Development 1: Southwick Drive TIA
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Project Trip
PM Peak Hour
Approved Development 1: Southwick Drive TIA
DRAFT
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Maybank Highway at Fern Hill Drive
AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Adjusted Turning Movement Counts 1 1 461 3 0 683 1 0 0 0 1 0 3
AM Volume Balancing 0 39 -3 0 78 0 0 0 0 0 0 0
AM 2025 EXISTING TRAFFIC 1 500 0 0 761 1 0 0 0 1 0 3
AM Heavy Vehicle Percentage 2% 2% 2% 2% 3% 2% 2% 2% 2% 2% 2% 2%
AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
AM 2028 NO-BUILD TRAFFIC GROWTH 0 46 0 0 71 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC (No AD) 1 546 0 0 832 1 0 0 0 1 0 3
34
TOTAL AM APPROVED DEVELOPMENT TRAFFIC 34 0 0 0 14 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC 35 546 0 0 846 1 0 0 0 1 0 3
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 20% 30%
Distribution Exiting 40% 10% 10%
"AM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 13 0 0 2 4 0 0 0 3 0 4
AM TOTAL PROJECT TRIPS 0 13 0 0 2 4 0 0 0 3 0 4
AM 2028 BUILD-OUT TRAFFIC 35 559 0 0 848 5 0 0 0 4 0 7
PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
PM Adjusted Turning Movement Counts 1 2 713 2 1 916 4 0 0 0 1 0 2
PM Volume Balancing 0 20 -2 0 0 0 0 0 0 0 0 1
PM 2025 EXISTING TRAFFIC 2 733 0 1 916 4 0 0 0 1 0 3
PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PM 2028 NO-BUILD TRAFFIC GROWTH 0 68 0 0 85 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC (No AD) 2 801 0 1 1,001 4 0 0 0 1 0 3
22 33
TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 22 0 0 33 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC 2 823 0 1 1,034 4 0 0 0 1 0 3
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 20% 30%
Distribution Exiting 40% 10% 10%
"PM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 9 0 0 7 11 0 0 0 2 0 3
PM TOTAL PROJECT TRIPS 0 9 0 0 7 11 0 0 0 2 0 3
PM 2028 BUILD-OUT TRAFFIC 2 832 0 1 1,041 15 0 0 0 3 0 6
Project Trip
AM Peak Hour
Approved Development 1: Southwick Drive TIA
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Project Trip
PM Peak Hour
Approved Development 1: Southwick Drive TIA
DRAFT
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Fern Hill Drive at Cross Island Extension
AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 2 0 0 4 0
AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0
AM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 2 0 0 4 0
AM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
AM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 2 0 0 4 0
TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 2 0 0 4 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 30%
Distribution Exiting 20%
"AM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 0 7 0 0 0 4 0 0 0 0 0
AM TOTAL PROJECT TRIPS 0 0 7 0 0 0 4 0 0 0 0 0
AM 2028 BUILD-OUT TRAFFIC 0 0 7 0 0 0 4 2 0 0 4 0
PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
PM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 6 0 0 3 0
PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 1 0
PM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 6 0 0 4 0
PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 1 0 0 0 0
PM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 7 0 0 4 0
TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 7 0 0 4 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 30%
Distribution Exiting 20%
"PM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 0 5 0 0 0 11 0 0 0 0 0
PM TOTAL PROJECT TRIPS 0 0 5 0 0 0 11 0 0 0 0 0
PM 2028 BUILD-OUT TRAFFIC 0 0 5 0 0 0 11 7 0 0 4 0
Project Trip
AM Peak Hour
Approved Development 1: Southwick Drive TIA
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Project Trip
PM Peak Hour
Approved Development 1: Southwick Drive TIA
DRAFT
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Project Driveway #1 at Cross Island Extension
AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0
AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0
AM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
AM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
AM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 20% 5% 15%
Distribution Exiting 30% 20% 5%
"AM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 2 1 10 7 0 2 0 2 0 0 0
AM TOTAL PROJECT TRIPS 0 2 1 10 7 0 2 0 2 0 0 0
212 108
51
AM 2028 BUILD-OUT TRAFFIC 0 2 264 10 7 0 110 0 2 0 0 0
PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
PM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0
PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0
PM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 20% 5% 15%
Distribution Exiting 30% 20% 5%
"PM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 7 2 7 5 0 1 0 5 0 0 0
PM TOTAL PROJECT TRIPS 0 7 2 7 5 0 1 0 5 0 0 0
115 311
33
PM 2028 BUILD-OUT TRAFFIC 0 7 150 7 5 0 312 0 5 0 0 0
Project Trip
AM Peak Hour
Approved Development 1: Southwick Drive TIA
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Project Trip
PM Peak Hour
Approved Development 1: Southwick Drive TIA
DRAFT
INTERSECTION TRAFFIC VOLUME DEVELOPMENT
Southwick Drive at Cross Island Extension
AM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
AM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0
AM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0
AM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
AM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
AM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
AM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL AM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
AM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 25%
Distribution Exiting 25%
"AM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 3 0 0 9 0 0 0 0 0 0 0
AM TOTAL PROJECT TRIPS 0 3 0 0 9 0 0 0 0 0 0 0
212 22 108
51
AM 2028 BUILD-OUT TRAFFIC 0 266 22 0 117 0 15 0 0 0 0 0
PM 2025 EXISTING TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
PM Adjusted Turning Movement Counts 1 0 0 0 0 0 0 0 0 0 0 0 0
PM Volume Balancing 0 0 0 0 0 0 0 0 0 0 0 0
PM 2025 EXISTING TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
PM Heavy Vehicle Percentage 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2% 2%
PM 2028 NO-BUILD TRAFFIC EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Years To Buildout 3 3 3 3 3 3 3 3 3 3 3 3
Annual Growth Rate 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0% 3.0%
PM 2028 NO-BUILD TRAFFIC GROWTH 0 0 0 0 0 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC (No AD) 0 0 0 0 0 0 0 0 0 0 0 0
TOTAL PM APPROVED DEVELOPMENT TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
PM 2028 NO-BUILD TRAFFIC 0 0 0 0 0 0 0 0 0 0 0 0
"SITE TRAFFIC DISTRUBUTION"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New Entering 25%
Distribution Exiting 25%
"PM PROJECT TRIPS"
LAND USE TYPE EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Net New 0 9 0 0 6 0 0 0 0 0 0 0
PM TOTAL PROJECT TRIPS 0 9 0 0 6 0 0 0 0 0 0 0
115 13 311
33
PM 2028 BUILD-OUT TRAFFIC 0 157 13 0 317 0 34 0 0 0 0 0
Project Trip
AM Peak Hour
Approved Development 1: Southwick Drive TIA
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Background Volume Redistribution
Southwick Drive TIA Volume Redistribution
Project Trip
PM Peak Hour
Approved Development 1: Southwick Drive TIA
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Appendix D – Traffic Signal Warrant Analysis Worksheets
DRAFT
Southwick TIA ITE Data
Land Use Code
Land Use
Setting
Time Period
Time Total Entering Exiting Total Entering Exiting Total Entering Exiting
6:00 - 7:00 AM 3.7% 1.6% 5.8% 3.5% 1.1% 5.8% 4.2% 1.4% 6.9%
7:00 - 8:00 AM 6.5% 3.1% 10.0% 7.9% 2.7% 13.2% 6.5% 2.0% 10.8%
8:00 - 9:00 AM 6.2% 3.8% 8.5% 6.6% 3.8% 9.3% 5.8% 3.1% 8.5%
9:00 - 10:00 AM 4.6% 3.3% 5.8% 5.3% 3.7% 6.9% 3.9% 2.9% 4.9%
10:00 - 11:00 AM 4.9% 4.2% 5.6% 4.1% 4.0% 4.3% 3.6% 2.4% 4.8%
11:00 - 12:00 PM 5.3% 5.4% 5.1% 5.3% 4.8% 5.7% 4.3% 3.8% 4.7%
12:00 - 1:00 PM 5.7% 5.7% 5.7% 5.2% 5.4% 5.1% 4.3% 4.5% 4.1%
1:00 - 2:00 PM 6.1% 6.1% 6.0% 4.7% 4.5% 4.8% 4.2% 4.0% 4.4%
2:00 - 3:00 PM 6.6% 7.1% 6.1% 5.8% 5.5% 6.0% 5.2% 5.6% 4.9%
3:00 - 4:00 PM 7.5% 8.7% 6.2% 6.5% 8.2% 4.8% 6.1% 6.9% 5.3%
4:00 - 5:00 PM 8.9% 10.5% 7.4% 7.5% 9.8% 5.1% 7.9% 10.1% 5.6%
5:00 - 6:00 PM 8.7% 10.0% 7.3% 9.4% 12.1% 6.8% 9.5% 11.4% 7.6% Daily In Out
6:00 - 7:00 PM 7.2% 8.5% 5.9% 8.2% 9.8% 6.6% 8.2% 9.7% 6.7% LUC 210 76 38 38
LUC 215 833 417 416
Land Use Code LUC 220 306 153 153
Land Use
Time Total Entering Exiting Total Entering Exiting Total Entering Exiting Time Total Entering Exiting
6:00 - 7:00 AM 3 1 2 29 4 24 13 2 11 6:00 - 7:00 AM 45 7 37
7:00 - 8:00 AM 5 1 4 66 11 55 20 3 17 7:00 - 8:00 AM 91 15 76
8:00 - 9:00 AM 5 1 3 55 16 39 18 5 13 8:00 - 9:00 AM 78 22 55
9:00 - 10:00 AM 3 1 2 44 16 29 12 4 7 9:00 - 10:00 AM 59 21 38
10:00 - 11:00 AM 4 2 2 35 17 18 11 4 7 10:00 - 11:00 AM 50 23 27
11:00 - 12:00 PM 4 2 2 44 20 24 13 6 7 11:00 - 12:00 PM 61 28 33
12:00 - 1:00 PM 4 2 2 44 23 21 13 7 6 12:00 - 1:00 PM 61 32 29
1:00 - 2:00 PM 5 2 2 39 19 20 13 6 7 1:00 - 2:00 PM 57 27 29
2:00 - 3:00 PM 5 3 2 48 23 25 16 9 7 2:00 - 3:00 PM 69 35 34
3:00 - 4:00 PM 6 3 2 54 34 20 19 11 8 3:00 - 4:00 PM 79 48 30
4:00 - 5:00 PM 7 4 3 62 41 21 24 15 9 4:00 - 5:00 PM 93 60 33
5:00 - 6:00 PM 7 4 3 79 50 28 29 17 12 5:00 - 6:00 PM 115 71 43
6:00 - 7:00 PM 5 3 2 68 41 27 25 15 10 6:00 - 7:00 PM 98 59 39
210 215
Single-Family Detached Housing Single-Family Attached Housing
220
Multifamily Housing (Low-Rise)
% of 24-Hour Vehicle Trips % of 24-Hour Vehicle Trips % of 24-Hour Vehicle Trips
General Urban/Suburban General Urban/Suburban General Urban/Suburban
Weekday Weekday Weekday
210 215 220
Single-Family Detached Housing Single-Family Attached Housing Multifamily Housing (Low-Rise)
DRAFT
DRB Maybank ITE Data
Land Use Code
Land Use
Setting
Time Period
Time Total Entering Exiting Total Entering Exiting
6:00 - 7:00 AM 3.7% 1.6% 5.8% 3.5% 1.1% 5.8%
7:00 - 8:00 AM 6.5% 3.1% 10.0% 7.9% 2.7% 13.2%
8:00 - 9:00 AM 6.2% 3.8% 8.5% 6.6% 3.8% 9.3%
9:00 - 10:00 AM 4.6% 3.3% 5.8% 5.3% 3.7% 6.9%
10:00 - 11:00 AM 4.9% 4.2% 5.6% 4.1% 4.0% 4.3%
11:00 - 12:00 PM 5.3% 5.4% 5.1% 5.3% 4.8% 5.7%
12:00 - 1:00 PM 5.7% 5.7% 5.7% 5.2% 5.4% 5.1%
1:00 - 2:00 PM 6.1% 6.1% 6.0% 4.7% 4.5% 4.8%
2:00 - 3:00 PM 6.6% 7.1% 6.1% 5.8% 5.5% 6.0%
3:00 - 4:00 PM 7.5% 8.7% 6.2% 6.5% 8.2% 4.8%
4:00 - 5:00 PM 8.9% 10.5% 7.4% 7.5% 9.8% 5.1%
5:00 - 6:00 PM 8.7% 10.0% 7.3% 9.4% 12.1% 6.8% Daily In Out
6:00 - 7:00 PM 7.2% 8.5% 5.9% 8.2% 9.8% 6.6% LUC 210 414 207 207
LUC 220 239 120 119
Land Use Code
Land Use
Time Total Entering Exiting Total Entering Exiting Time Total Entering Exiting
6:00 - 7:00 AM 15 3 12 8 1 7 6:00 - 7:00 AM 23 4 19
7:00 - 8:00 AM 27 6 21 19 3 16 7:00 - 8:00 AM 46 9 37
8:00 - 9:00 AM 26 8 18 16 5 11 8:00 - 9:00 AM 42 13 29
9:00 - 10:00 AM 19 7 12 13 4 8 9:00 - 10:00 AM 32 11 20
10:00 - 11:00 AM 20 9 12 10 5 5 10:00 - 11:00 AM 30 14 17
11:00 - 12:00 PM 22 11 11 13 6 7 11:00 - 12:00 PM 35 17 18
12:00 - 1:00 PM 24 12 12 13 7 6 12:00 - 1:00 PM 37 19 18
1:00 - 2:00 PM 25 13 12 11 5 6 1:00 - 2:00 PM 36 18 18
2:00 - 3:00 PM 27 15 13 14 7 7 2:00 - 3:00 PM 41 22 20
3:00 - 4:00 PM 31 18 13 16 10 6 3:00 - 4:00 PM 47 28 19
4:00 - 5:00 PM 37 22 15 18 12 6 4:00 - 5:00 PM 55 34 21
5:00 - 6:00 PM 36 21 15 23 15 8 5:00 - 6:00 PM 59 36 23
6:00 - 7:00 PM 30 18 12 20 12 8 6:00 - 7:00 PM 50 30 20
210 215
Single-Family Detached Housing Single-Family Attached Housing
215
Single-Family Attached Housing
General Urban/Suburban
Weekday
% of 24-Hour Vehicle Trips
210
Single-Family Detached Housing
General Urban/Suburban
Weekday
% of 24-Hour Vehicle Trips
DRAFT
Existing Traffic Volumes
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 AM 0 0 489 0 0 5 322 0 0 4 0 35 0 0 0 0 855
7:00 AM 0 0 411 11 0 16 691 0 0 20 0 48 0 0 0 0 1,197
8:00 AM 0 0 438 16 0 25 733 0 0 29 0 30 0 0 0 0 1,271
9:00 AM 0 0 444 14 0 25 593 0 0 15 0 32 0 0 0 0 1,123
10:00 AM 0 0 561 11 0 24 585 0 0 10 0 39 0 0 0 0 1,230
11:00 AM 0 0 592 11 0 38 616 0 0 12 0 45 0 0 0 0 1,314
12:00 PM 0 0 650 22 0 57 663 0 0 17 0 43 0 0 0 0 1,452
1:00 PM 0 0 575 17 0 44 665 0 0 9 0 40 0 0 0 0 1,350
2:00 PM 0 0 609 22 0 47 714 0 0 18 0 37 0 0 0 0 1,447
3:00 PM 0 0 617 10 0 47 729 0 0 16 0 22 0 0 0 0 1,441
4:00 PM 0 0 708 21 0 61 831 0 0 17 0 48 0 0 0 0 1,686
5:00 PM 0 0 570 26 0 66 841 0 0 16 0 30 0 0 0 0 1,549
6:00 PM 0 0 575 14 0 60 695 0 0 9 0 30 0 0 0 0 1,383
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 AM 0 3 339 9 0 7 318 23 0 5 3 10 0 87 9 30 843
7:00 AM 0 29 250 9 0 7 617 61 0 7 5 9 0 101 6 111 1,212
8:00 AM 0 28 348 25 0 21 599 99 0 17 3 11 0 113 8 93 1,365
9:00 AM 0 20 413 16 0 18 544 62 0 13 7 15 0 73 11 40 1,232
10:00 AM 0 30 470 14 0 14 600 84 0 14 3 16 0 57 5 38 1,345
11:00 AM 0 51 612 17 0 16 565 86 0 12 0 19 0 73 3 44 1,498
12:00 PM 0 42 532 13 0 16 601 104 0 15 5 18 0 88 7 34 1,475
1:00 PM 0 40 558 16 0 18 535 89 0 13 5 15 0 54 4 36 1,383
2:00 PM 0 64 567 19 0 17 681 111 0 8 5 24 0 58 6 40 1,600
3:00 PM 0 109 553 14 0 12 640 169 0 9 0 13 0 69 4 41 1,633
4:00 PM 0 139 639 23 0 16 598 185 0 15 3 23 0 57 5 45 1,748
5:00 PM 0 106 560 22 0 15 505 174 0 16 10 19 0 57 9 26 1,519
6:00 PM 0 44 434 13 0 16 418 119 0 19 5 26 0 46 6 13 1,159
Time
MAYBANK HWY MAYBANK HWY SOUTHWICK DR SOUTHWICK DR
Total
Eastbound Westbound Northbound Southbound
Time
MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY -
Total
Eastbound Westbound Northbound Southbound
DRAFT
DRB Maybank Residential Development Project Site Trips
Entering Distribution 25% 20%
Exiting Distribution 10% 40% 15%
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 AM 0 1 0 0 0 0 2 1 0 0 0 0 0 8 0 3 15
7:00 AM 0 2 0 0 0 0 4 2 0 0 0 0 0 15 0 6 29
8:00 AM 0 3 0 0 0 0 3 3 0 0 0 0 0 12 0 4 25
9:00 AM 0 3 0 0 0 0 2 2 0 0 0 0 0 8 0 3 18
10:00 AM 0 4 0 0 0 0 2 3 0 0 0 0 0 7 0 3 19
11:00 AM 0 4 0 0 0 0 2 3 0 0 0 0 0 7 0 3 19
12:00 PM 0 5 0 0 0 0 2 4 0 0 0 0 0 7 0 3 21
1:00 PM 0 5 0 0 0 0 2 4 0 0 0 0 0 7 0 3 21
2:00 PM 0 6 0 0 0 0 2 4 0 0 0 0 0 8 0 3 23
3:00 PM 0 7 0 0 0 0 2 6 0 0 0 0 0 8 0 3 26
4:00 PM 0 9 0 0 0 0 2 7 0 0 0 0 0 8 0 3 29
5:00 PM 0 9 0 0 0 0 2 7 0 0 0 0 0 9 0 3 30
6:00 PM 0 8 0 0 0 0 2 6 0 0 0 0 0 8 0 3 27
Southwick TIA Approved Development Trip Diversion
Entering Distribution 25% 50%
Exiting Distribution 50% 25%
U-Turn
Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 AM 0 2 0 0 0 0 0 4 0 0 0 0 0 19 0 9 34
7:00 AM 0 4 0 0 0 0 0 8 0 0 0 0 0 38 0 19 69
8:00 AM 0 6 0 0 0 0 0 11 0 0 0 0 0 28 0 14 59
9:00 AM 0 5 0 0 0 0 0 11 0 0 0 0 0 19 0 10 45
10:00 AM 0 6 0 0 0 0 0 12 0 0 0 0 0 14 0 7 39
11:00 AM 0 7 0 0 0 0 0 14 0 0 0 0 0 17 0 8 46
12:00 PM 0 8 0 0 0 0 0 16 0 0 0 0 0 15 0 7 46
1:00 PM 0 7 0 0 0 0 0 14 0 0 0 0 0 15 0 7 43
2:00 PM 0 9 0 0 0 0 0 18 0 0 0 0 0 17 0 9 53
3:00 PM 0 12 0 0 0 0 0 24 0 0 0 0 0 15 0 8 59
4:00 PM 0 15 0 0 0 0 0 30 0 0 0 0 0 17 0 8 70
5:00 PM 0 18 0 0 0 0 0 36 0 0 0 0 0 22 0 11 87
6:00 PM 0 15 0 0 0 0 0 30 0 0 0 0 0 20 0 10 75
Southwick Drive Existing Traffic Volume Diversion: 90%
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 AM 3 -3 -21 21 78 27 105
7:00 AM 26 -26 -55 55 91 100 191
8:00 AM 25 -25 -89 89 102 84 186
9:00 AM 18 -18 -56 56 66 36 102
10:00 AM 27 -27 -76 76 51 34 85
11:00 AM 46 -46 -77 77 66 40 106
12:00 PM 38 -38 -94 94 79 31 110
1:00 PM 36 -36 -80 80 49 32 81
2:00 PM 58 -58 -100 100 52 36 88
3:00 PM 98 -98 -152 152 62 37 99
4:00 PM 125 -125 -167 167 51 41 92
5:00 PM 95 -95 -157 157 51 23 74
6:00 PM 40 -40 -107 107 41 12 53
Total
Eastbound Westbound Northbound Southbound
Time
MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY
Time
MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY
Total
Eastbound Westbound Northbound Southbound
Time
MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY
Total
Eastbound Westbound Northbound Southbound
DRAFT
Existing Traffic Volumes with DRB Maybank Trips, Southwick Trips, and Southwick Road Diversion
U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right U-Turn Left Thru Right
6:00 AM 0 6 486 0 0 5 303 26 0 4 0 35 0 105 0 39 1,009
7:00 AM 0 32 385 11 0 16 640 65 0 20 0 48 0 144 0 125 1,486
8:00 AM 0 34 413 16 0 25 647 103 0 29 0 30 0 142 0 102 1,541
9:00 AM 0 26 426 14 0 25 539 69 0 15 0 32 0 93 0 49 1,288
10:00 AM 0 37 534 11 0 24 511 91 0 10 0 39 0 72 0 44 1,373
11:00 AM 0 57 546 11 0 38 541 94 0 12 0 45 0 90 0 51 1,485
12:00 PM 0 51 612 22 0 57 571 114 0 17 0 43 0 101 0 41 1,629
1:00 PM 0 48 539 17 0 44 587 98 0 9 0 40 0 71 0 42 1,495
2:00 PM 0 73 551 22 0 47 616 122 0 18 0 37 0 77 0 48 1,611
3:00 PM 0 117 519 10 0 47 579 182 0 16 0 22 0 85 0 48 1,625
4:00 PM 0 149 583 21 0 61 666 204 0 17 0 48 0 76 0 52 1,877
5:00 PM 0 122 475 26 0 66 686 200 0 16 0 30 0 82 0 37 1,740
6:00 PM 0 63 535 14 0 60 590 143 0 9 0 30 0 69 0 25 1,538
Time
MAYBANK HWY MAYBANK HWY ST JOHNS WOODS PARKWAY PROJECT DRIVEWAY
Total
Eastbound Westbound Northbound Southbound
DRAFT
Y
N
N
1
1 100%
Major Minor Major Minor Major Minor Major Minor Minor Minor Total
Street Street Street Street Street Street Street Street Delay Volume Intrsctn
12:00 AM TO 01:00 AM
01:00 AM TO 02:00 AM
02:00 AM TO 03:00 AM
03:00 AM TO 04:00 AM
04:00 AM TO 05:00 AM
05:00 AM TO 06:00 AM
06:00 AM TO 07:00 AM 826 105 236% 100% 157% 198% 207% 88% 138% 175%
07:00 AM TO 08:00 AM 1149 144 328% 137% 219% 272% 287% 120% 192% 240%
08:00 AM TO 09:00 AM 1238 142 354% 135% 236% 268% 310% 118% 206% 237%
09:00 AM TO 10:00 AM 1099 93 314% 89% 209% 175% 275% 78% 183% 155%
10:00 AM TO 11:00 AM 1208 72 345% 69% 230% 136% 302% 60% 201% 120%
11:00 AM TO 12:00 PM 1287 90 368% 86% 245% 170% 322% 75% 215% 150%
12:00 PM TO 01:00 PM 1427 101 408% 96% 272% 191% 357% 84% 238% 168%
01:00 PM TO 02:00 PM 1333 71 381% 68% 254% 134% 333% 59% 222% 118%
02:00 PM TO 03:00 PM 1431 77 409% 73% 273% 145% 358% 64% 239% 128%
03:00 PM TO 04:00 PM 1454 85 415% 81% 277% 160% 364% 71% 242% 142%
04:00 PM TO 05:00 PM 1684 76 481% 72% 321% 143% 421% 63% 281% 127%
05:00 PM TO 06:00 PM 1575 82 450% 78% 300% 155% 394% 68% 263% 137%
06:00 PM TO 07:00 PM 1405 69 401% 66% 268% 130% 351% 58% 234% 115%
07:00 PM TO 08:00 PM
08:00 PM TO 09:00 PM
09:00 PM TO 10:00 PM
10:00 PM TO 11:00 PM
11:00 PM TO 12:00 AM
350 105 525 53 400 120 600 60
TOTAL 3 TOTAL 13 TOTAL 2 TOTAL 13 TOTAL 13 TOTAL 9
Met? NO Met? YES TOTAL 2 Met? NO Met? Yes Met? Yes
TRAFFIC SIGNAL WARRANT ANALYSIS
City/County: Johns Island 85th-percentile speed on the major street exceeds 40 mph? (Y or N)
This considers the existing traffic volumes with the DRB Maybank Project Trips, Southwick TIA Project Trips,
and diversion of traffic expected from the Southwick Road intersection. Warrant 1, Condition B and Warrant 2 thresholds are exceeded and therefore meets warrants for a traffic signal.
Date: 4/30/2026 Apply 56% warrant to Warrant 1, Combination Warrant? (Y or N) Analyzed by: Kimley-Horn
State: South Carolina Isolated community with a population of less than 10,000? (Y or N) Analyzed by: WDS
Major Street: Maybank Highway Approach Lanes - Major? (1 or 2)
Minor Street: St Johns Woods Parkway/Project Driveway Approach Lanes - Minor? (1 or 2) Right-Turn Reduction:
Warrant 2
Warrant 3, Condition A Warrant 3,
Condition B
80% of 1A 80% of 1B24-Hour Volume Summary
Major Street Minor Street Warrant 1,
Condition A
Warrant 1,
Condition B
Warrant 1, Combination Warrant
Total of Both
Approaches
Higher
Volume
175% 91%
240% 192%
237% 189%
155% 124%
120% 96%
150% 120%
168% 135%
118% 95%
128% 103%
142% 113%
127% 101%
137% 109%
MUTCD Figure
115% 92%
Threshold Threshold Threshold Threshold MUTCD Figure Warranting Volumes
TOTAL
Source: MUTCD, 2009 Edition 4C-1 and 4C-2 4C-3 and 4C-4
Created By: Kimley-Horn and Associates, Inc. Summary Summary Summary Summary
Met?
Summary Summary Summary
COMMENTS/NOTES: COMMENTS/NOTES:
DRAFT
SOUTHWICK DR SOUTHWICK DRMAYBANK HWYMAYBANK HWY
(303) 216-2439
www.alltrafficdata.net
Location: 1 SOUTHWICK DR & MAYBANK HWY AM
Thursday, October 31, 2024Date:
Peak Hour - Motorized Vehicles Peak Hour - Bicycles Peak Hour - Pedestrians
Traffic Counts - Motorized Vehicles
Note: Total study counts contained in parentheses.
Peak Hour: 03:45 PM - 04:45 PM
Peak 15-Minutes: 04:00 PM - 04:15 PM
113 338
811
725
4040
801
662
0.93
N
S
EW
0.91
0.93
0.69
0.94
(2,125)(1,607)
(8,780)
(7,428)
(7,975)
(7,190)
(435)(484)
44
0
63
191
605
15
19
637
145
0
0
613
2
25
0
MAYBANK HWY
MAYBANK HWY
SOUTHWICK DR
SOUTHWICK DR
0
0
0
0
N
S
EW
00
00
0 0
0 0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
N
S
EW
0 0
0 0
0 0
0 0
0
0
0
0
Left Thru Right Total
EastboundInterval
Start Time
Rolling
Hour West East South North
Pedestrian Crossings
U-Turn
Westbound Northbound Southbound
Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn
6:00 AM 0 1 1 0 14 10 1 48 0 2 38 119 0 0 0 08433 2 4 4
6:15 AM 0 1 0 0 23 20 1 86 0 1 68 192 0 0 0 09721 4 0 5
6:30 AM 0 0 0 0 33 30 0 109 0 3 79 240 0 0 0 01,0651 3 3 6
6:45 AM 0 3 2 0 17 30 1 96 0 1 133 292 0 0 0 01,1674 14 3 15
7:00 AM 0 1 0 0 18 00 6 64 0 3 116 248 0 0 0 01,2121 9 2 28
7:15 AM 0 2 2 0 27 20 10 61 0 1 138 285 0 0 0 01,3141 17 3 21
7:30 AM 0 1 0 0 28 10 6 68 0 1 187 342 0 0 1 01,3774 16 0 30
7:45 AM 0 3 3 0 28 30 7 57 0 2 176 337 0 0 0 01,3643 19 4 32
8:00 AM 0 5 2 0 28 20 6 83 0 8 150 350 0 0 1 01,3654 25 2 35
8:15 AM 0 4 0 0 21 30 15 87 0 2 155 348 0 0 0 01,3156 28 3 24
8:30 AM 0 2 0 0 31 10 4 80 0 9 155 329 0 0 0 01,2777 18 3 19
8:45 AM 0 6 1 0 33 20 3 98 0 2 139 338 0 0 0 01,2438 28 3 15
9:00 AM 0 2 1 0 18 40 3 79 0 7 152 300 0 0 0 01,2321 19 3 11
9:15 AM 0 5 2 0 17 40 6 103 0 4 134 310 0 0 1 01,2836 14 4 11
9:30 AM 0 2 2 0 14 10 7 104 0 3 134 295 0 0 0 01,2843 10 5 10
9:45 AM 0 4 2 0 24 20 4 127 0 4 124 327 0 0 0 01,3076 19 3 8
10:00 AM 0 3 1 0 6 10 4 119 0 4 165 351 0 0 0 01,3453 33 3 9
10:15 AM 0 5 2 0 16 20 7 113 0 3 133 311 0 0 0 01,3602 13 7 8
10:30 AM 0 4 0 0 15 10 12 107 0 0 144 318 0 0 0 01,4065 23 0 7
10:45 AM 0 2 0 0 20 10 7 131 0 7 158 365 0 0 0 01,4784 15 6 14
11:00 AM 0 4 0 0 16 00 11 164 0 5 128 366 0 0 0 01,4983 23 4 8
11:15 AM 0 3 0 0 19 00 15 143 0 3 137 357 0 0 0 01,5024 16 7 10
11:30 AM 0 3 0 0 19 10 14 156 0 0 154 390 0 0 0 01,5205 20 5 13
11:45 AM 0 2 0 0 19 20 11 149 0 8 146 385 0 0 0 01,4805 27 3 13
12:00 PM 0 3 2 0 18 30 15 123 0 2 156 370 0 0 0 01,4755 23 7 13
12:15 PM 0 2 1 0 23 30 9 148 0 10 146 375 0 0 0 01,4851 24 2 6
12:30 PM 0 7 2 0 21 10 8 138 0 2 132 350 0 0 0 01,4634 27 2 6
12:45 PM 0 3 0 0 26 00 10 123 0 2 167 380 0 0 0 01,4553 30 7 9
1:00 PM 0 2 2 0 14 10 12 160 0 3 151 380 0 0 0 01,3834 21 4 6
1:15 PM 0 3 0 0 21 00 9 138 0 5 137 353 0 0 0 01,5084 24 4 8
1:30 PM 0 7 1 0 10 20 11 149 0 3 126 342 0 0 0 01,5074 15 4 10
1:45 PM 0 1 2 0 9 10 8 111 0 7 121 308 0 0 0 01,5604 29 3 12
2:00 PM 0 2 3 0 7 00 12 170 1 7 250 505 0 0 0 01,6009 28 6 10
2:15 PM 0 3 0 0 14 30 15 119 0 5 152 352 0 0 1 01,4941 28 6 6
DRAFT
Peak Rolling Hour Flow Rates
Heavy Vehicle Percentage and Peak Hour Factor
2:30 PM 0 3 0 0 17 10 26 153 0 1 146 395 0 0 1 01,5143 23 5 17
2:45 PM 0 0 2 0 20 20 11 125 0 3 133 348 0 0 0 01,5456 32 7 7
3:00 PM 0 5 0 0 16 10 22 140 0 3 156 399 1 0 1 01,6333 40 2 11
3:15 PM 0 1 0 0 24 00 26 119 0 4 152 372 0 0 0 01,7102 32 3 9
3:30 PM 0 0 0 0 10 00 30 142 0 2 181 426 0 0 0 01,7546 43 3 9
3:45 PM 0 3 0 0 19 30 31 152 0 3 151 436 0 0 0 01,7653 54 5 12
4:00 PM 0 4 1 0 18 10 28 180 0 3 160 476 0 0 0 01,7486 52 10 13
4:15 PM 0 4 0 0 16 00 40 150 0 5 149 416 0 0 0 01,6584 37 2 9
4:30 PM 0 2 1 0 10 20 46 155 0 4 145 437 0 0 0 01,6386 48 8 10
4:45 PM 0 5 1 0 13 20 25 154 0 4 144 419 0 0 0 01,5737 48 3 13
5:00 PM 0 3 2 0 18 20 29 146 0 2 119 386 0 0 0 01,5195 49 2 9
5:15 PM 0 3 4 0 15 30 25 143 0 3 131 396 0 0 0 01,4826 45 6 12
5:30 PM 0 6 3 0 16 10 29 138 0 6 120 372 0 0 0 01,4127 37 6 3
5:45 PM 0 4 1 0 8 30 23 133 1 3 135 365 0 0 0 01,2854 43 5 2
6:00 PM 0 5 1 0 16 10 21 127 0 3 115 349 0 0 0 01,1593 47 4 6
6:15 PM 0 3 1 0 12 20 8 132 0 6 115 326 0 0 0 03 32 8 4
6:30 PM 0 3 1 0 12 20 8 85 0 5 102 245 0 0 0 02 17 6 2
6:45 PM 0 8 2 0 6 10 7 90 0 2 86 239 0 0 0 05 23 8 1
Vehicle Type Left Thru Right
Eastbound
U-Turn
Westbound Northbound Southbound
TotalLeft Thru RightU-Turn Left Thru RightU-TurnLeft Thru RightU-Turn
Articulated Trucks 0 0 0 0 0 00 1 0 0 0 0 10 0 0 0
Lights 13 2 25 63 6 43142 633 19 15 597 189 1,7470 0 0 0
Mediums 0 0 0 0 0 13 3 0 0 8 2 170 0 0 0
Total 145 637 19 15 605 191 13 2 25 63 6 44 1,7650 0 0 0
Left Thru Right Total
Eastbound
U-Turn
Westbound Northbound Southbound
Left Thru RightU-Turn Left Thru RightU-Turn Left Thru RightU-Turn
0.0% 0.0% 0.0% 0.0% 0.0% 0.0%0.0% 0.0% 0.2% 0.0% 0.0% 0.0% 0.1%0.0% 0.0% 0.0% 0.0%
Heavy Vehicle %
Heavy Vehicle %
Peak Hour Factor
Peak Hour Factor
0.1% 0.0% 0.0% 0.0% 0.1%
0.93
0.94 0.93 0.69 0.91 0.93
0.00 0.59 0.63 0.00 0.86 0.690.00 0.79 0.89 0.25 0.55 0.680.78 0.88 0.81 0.86
DRAFT
File Name : Maybank Hwy @ St Johns Woods Pkwy
Site Code :
Start Date : 04/21/2026
Page No : 1
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Southbound
Maybank Hwy
Westbound
St Johns Woods Pkwy
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
06:00 0 0 0 0 1 55 0 0 1 0 7 0 0 93 0 0 157
06:15 0 0 0 0 1 64 0 0 0 0 6 0 0 113 0 0 184
06:30 0 0 0 0 4 103 0 0 1 0 12 0 0 149 0 0 269
06:45 0 0 0 0 0 117 0 0 2 0 11 0 0 148 0 0 278
Total 0 0 0 0 6 339 0 0 4 0 36 0 0 503 0 0 888
07:00 0 0 0 0 2 138 0 0 3 0 10 0 0 110 4 0 267
07:15 0 0 0 0 3 172 0 0 6 0 11 0 0 120 3 0 315
07:30 0 0 0 0 2 204 0 0 4 0 9 0 0 109 3 0 331
07:45 0 0 0 0 10 197 0 0 7 0 20 0 0 88 2 0 324
Total 0 0 0 0 17 711 0 0 20 0 50 0 0 427 12 0 1237
08:00 0 0 0 0 9 212 0 0 8 0 11 0 0 101 2 0 343
08:15 0 0 0 0 9 201 0 0 7 0 5 0 0 101 4 0 327
08:30 0 0 0 0 3 181 0 0 11 0 8 0 0 122 5 0 330
08:45 0 0 0 0 4 166 0 0 3 0 6 0 0 121 5 0 305
Total 0 0 0 0 25 760 0 0 29 0 30 0 0 445 16 0 1305
09:00 0 0 0 0 12 168 0 0 5 0 9 0 0 111 4 0 309
09:15 0 0 0 0 4 143 0 0 3 0 8 0 0 97 5 0 260
09:30 0 0 0 0 4 169 0 0 3 0 11 0 0 125 2 0 314
09:45 0 0 0 0 5 137 0 0 4 0 4 0 0 119 3 0 272
Total 0 0 0 0 25 617 0 0 15 0 32 0 0 452 14 0 1155
10:00 0 0 0 0 6 156 0 0 3 0 16 0 0 128 3 0 312
10:15 0 0 0 0 10 162 0 0 2 0 11 0 0 153 3 0 341
10:30 0 0 0 0 5 134 0 0 4 0 5 0 0 142 2 0 292
10:45 0 0 0 0 4 150 0 0 1 0 8 0 0 156 4 0 323
Total 0 0 0 0 25 602 0 0 10 0 40 0 0 579 12 0 1268
11:00 0 0 0 0 14 147 0 0 4 0 16 0 0 128 3 0 312
11:15 0 0 0 0 9 168 0 0 0 0 10 0 0 157 3 0 347
11:30 0 0 0 0 6 156 0 0 6 0 10 0 0 160 3 2 343
11:45 0 0 0 0 12 166 0 0 3 0 10 0 0 160 2 0 353
Total 0 0 0 0 41 637 0 0 13 0 46 0 0 605 11 2 1355
12:00 0 0 0 0 16 176 0 0 3 0 13 0 0 174 7 0 389
12:15 0 0 0 0 19 189 0 0 6 0 11 0 0 143 4 0 372
12:30 0 0 0 0 10 150 0 0 2 0 10 0 0 173 7 2 354
12:45 0 0 0 0 13 167 0 0 6 0 10 0 0 187 5 3 391
Total 0 0 0 0 58 682 0 0 17 0 44 0 0 677 23 5 1506
13:00 0 0 0 0 14 179 0 0 4 0 6 0 0 150 3 0 356
13:15 0 0 0 0 15 165 0 0 0 0 9 0 0 141 4 0 334
13:30 0 0 0 0 5 155 0 0 4 0 11 0 0 161 5 0 341
13:45 0 0 0 0 10 182 0 0 2 0 15 0 0 146 6 0 361
Total 0 0 0 0 44 681 0 0 10 0 41 0 0 598 18 0 1392
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
File Name : Maybank Hwy @ St Johns Woods Pkwy
Site Code :
Start Date : 04/21/2026
Page No : 2
Groups Printed- Passenger Vehicles - Heavy Vehicles - Buses
Southbound
Maybank Hwy
Westbound
St Johns Woods Pkwy
Northbound
Maybank Hwy
Eastbound
Start Time Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Left Thru Right Peds Int. Total
14:00 0 0 0 0 7 167 0 0 2 0 9 0 0 155 4 0 344
14:15 0 0 0 0 13 180 0 0 6 0 13 0 0 133 3 0 348
14:30 0 0 0 0 11 188 0 0 5 0 6 1 0 176 10 0 397
14:45 0 0 0 0 17 186 0 0 5 0 11 0 0 168 6 0 393
Total 0 0 0 0 48 721 0 0 18 0 39 1 0 632 23 0 1482
15:00 0 0 0 0 13 182 0 0 6 0 1 0 0 156 0 0 358
15:15 0 0 0 0 12 189 0 0 4 0 7 0 0 157 1 0 370
15:30 0 0 0 0 10 199 0 0 1 0 3 0 0 148 5 0 366
15:45 0 0 0 0 13 173 0 0 8 0 12 0 0 165 4 0 375
Total 0 0 0 0 48 743 0 0 19 0 23 0 0 626 10 0 1469
16:00 0 0 0 0 15 186 0 0 2 0 10 0 0 199 7 0 419
16:15 0 0 0 0 11 219 0 0 6 0 23 0 0 177 4 0 440
16:30 0 0 0 0 14 215 0 0 4 0 6 0 0 185 4 0 428
16:45 0 0 0 0 21 229 0 0 5 0 9 0 0 158 6 0 428
Total 0 0 0 0 61 849 0 0 17 0 48 0 0 719 21 0 1715
17:00 0 0 0 0 20 229 0 0 4 0 12 0 0 134 7 0 406
17:15 0 0 0 0 16 223 0 0 6 0 9 0 0 136 6 0 396
17:30 0 0 0 0 8 186 0 0 4 0 6 1 0 158 6 0 369
17:45 0 0 0 0 22 208 0 0 4 0 4 0 0 147 7 0 392
Total 0 0 0 0 66 846 0 0 18 0 31 1 0 575 26 0 1563
18:00 0 0 0 0 18 175 0 0 1 0 9 0 0 150 4 0 357
18:15 0 0 0 0 14 179 0 0 1 0 7 0 0 139 1 0 341
18:30 0 0 0 0 10 175 0 0 4 0 7 0 0 149 3 0 348
18:45 0 0 0 0 18 168 0 0 3 0 7 0 0 145 6 0 347
Total 0 0 0 0 60 697 0 0 9 0 30 0 0 583 14 0 1393
Grand Total 0 0 0 0 524 8885 0 0 199 0 490 2 0 7421 200 7 17728
Apprch % 0 0 0 0 5.6 94.4 0 0 28.8 0 70.9 0.3 0 97.3 2.6 0.1
Total % 0 0 0 0 3 50.1 0 0 1.1 0 2.8 0 0 41.9 1.1 0
Passenger Vehicles 0 0 0 0 515 8678 0 0 192 0 479 2 0 7239 195 7 17307
% Passenger Vehicles 0 0 0 0 98.3 97.7 0 0 96.5 0 97.8 100 0 97.5 97.5 100 97.6
Heavy Vehicles 0 0 0 0 9 169 0 0 7 0 7 0 0 156 4 0 352
% Heavy Vehicles 0 0 0 0 1.7 1.9 0 0 3.5 0 1.4 0 0 2.1 2 0 2
Buses 0 0 0 0 0 38 0 0 0 0 4 0 0 26 1 0 69
% Buses 0 0 0 0 0 0.4 0 0 0 0 0.8 0 0 0.4 0.5 0 0.4
735 Maryland St
Columbia, SC 29201
We Can't say we're the Best, but you Can!
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
Appendix E – Capacity Analysis Worksheets
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
2025 EXISTING CONDITIONS
DRAFT
HCM 7th TWSC 2025 Existing AM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 22.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 22 348 13 14 653 87 6 4 19 102 14 99
Future Vol, veh/h 22 348 13 14 653 87 6 4 19 102 14 99
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - - - - 0 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 5 4 2 2 4 2 2 2 2 2 2 2
Mvmt Flow 24 374 14 15 702 94 6 4 20 110 15 106
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 796 0 0 388 0 0 1168 1254 381 1203 1215 749
Stage 1 - - - - - - 428 428 - 779 779 -
Stage 2 - - - - - - 740 826 - 424 435 -
Critical Hdwy 4.15 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.245 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 813 - - 1170 - - 170 172 666 161 181 412
Stage 1 - - - - - - 605 584 - 389 406 -
Stage 2 - - - - - - 409 387 - 608 580 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 813 - - 1170 - - 111 165 666 146 174 412
Mov Cap-2 Maneuver - - - - - - 111 165 - 146 174 -
Stage 1 - - - - - - 587 567 - 384 401 -
Stage 2 - - - - - - 288 382 - 568 563 -
Approach EB WB NB SB
HCM Control Delay, s/v 0.55 0.15 19.28 137.95
HCM LOS C F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 128 666 813 - - 1170 - - 211
HCM Lane V/C Ratio 0.084 0.031 0.029 - - 0.013 - - 1.096
HCM Control Delay (s/veh) 35.8 10.6 9.6 - - 8.1 - - 138
HCM Lane LOS E B A - - A - - F
HCM 95th %tile Q(veh) 0.3 0.1 0.1 - - 0 - - 10.7
DRAFT
HCM 7th TWSC 2025 Existing AM Peak Hour
2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 451 18 32 732 22 50
Future Vol, veh/h 451 18 32 732 22 50
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 250 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 3 2 2 4 2 2
Mvmt Flow 490 20 35 796 24 54
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 510 0 1365 500
Stage 1 - - - - 500 -
Stage 2 - - - - 865 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1055 - 162 571
Stage 1 - - - - 609 -
Stage 2 - - - - 412 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1055 - 157 571
Mov Cap-2 Maneuver - - - - 287 -
Stage 1 - - - - 609 -
Stage 2 - - - - 399 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.36 14.02
HCM LOS B
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 287 571 - - 1055 -
HCM Lane V/C Ratio 0.083 0.095 - - 0.033 -
HCM Control Delay (s/veh) 18.7 12 - - 8.5 -
HCM Lane LOS C B - - A -
HCM 95th %tile Q(veh) 0.3 0.3 - - 0.1 -
DRAFT
HCM 7th TWSC 2025 Existing AM Peak Hour
3: Maybank Highway & Fern Hill Drive DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 1 497 761 1 1 3
Future Vol, veh/h 1 497 761 1 1 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 3 2 2 2
Mvmt Flow 1 540 827 1 1 3
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 828 0 - 0 1370 828
Stage 1 - - - - 828 -
Stage 2 - - - - 542 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 803 - - - 161 371
Stage 1 - - - - 429 -
Stage 2 - - - - 583 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 803 - - - 161 371
Mov Cap-2 Maneuver - - - - 161 -
Stage 1 - - - - 428 -
Stage 2 - - - - 583 -
Approach EB WB SB
HCM Control Delay, s/v 0.02 0 18.07
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 4 - - - 280
HCM Lane V/C Ratio 0.001 - - - 0.016
HCM Control Delay (s/veh) 9.5 0 - - 18.1
HCM Lane LOS A A - - C
HCM 95th %tile Q(veh) 0 - - - 0
DRAFT
HCM 7th TWSC 2025 Existing PM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 26.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 127 629 22 17 675 188 11 1 22 51 9 57
Future Vol, veh/h 127 629 22 17 675 188 11 1 22 51 9 57
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 150 - - - - 0 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 137 676 24 18 726 202 12 1 24 55 10 61
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 928 0 0 700 0 0 1728 1926 688 1813 1837 827
Stage 1 - - - - - - 961 961 - 863 863 -
Stage 2 - - - - - - 767 965 - 950 973 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 737 - - 897 - - 69 67 446 61 76 372
Stage 1 - - - - - - 308 335 - 349 371 -
Stage 2 - - - - - - 395 333 - 312 330 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 737 - - 897 - - 40 53 446 ~ 45 60 372
Mov Cap-2 Maneuver - - - - - - 40 53 - ~ 45 60 -
Stage 1 - - - - - - 251 273 - 342 364 -
Stage 2 - - - - - - 314 327 - 240 269 -
Approach EB WB NB SB
HCM Control Delay, s/v 1.79 0.18 54.23 $ 385.38
HCM LOS F F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 41 446 737 - - 897 - - 81
HCM Lane V/C Ratio 0.315 0.053 0.185 - - 0.02 - - 1.544
HCM Control Delay (s/veh) 128.9 13.5 11 - - 9.1 - - $ 385.4
HCM Lane LOS F B B - - A - - F
HCM 95th %tile Q(veh) 1.1 0.2 0.7 - - 0.1 - - 10.2
Notes
~: Volume exceeds capacity $: Delay exceeds 300s +: Computation Not Defined *: All major volume in platoon
DRAFT
HCM 7th TWSC 2025 Existing PM Peak Hour
2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 1.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 684 18 60 859 21 51
Future Vol, veh/h 684 18 60 859 21 51
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 250 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 97 97 97 97 97 97
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 705 19 62 886 22 53
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 724 0 1724 714
Stage 1 - - - - 714 -
Stage 2 - - - - 1009 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 879 - 98 431
Stage 1 - - - - 485 -
Stage 2 - - - - 352 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 879 - 91 431
Mov Cap-2 Maneuver - - - - 218 -
Stage 1 - - - - 485 -
Stage 2 - - - - 327 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.61 17.08
HCM LOS C
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 218 431 - - 879 -
HCM Lane V/C Ratio 0.099 0.122 - - 0.07 -
HCM Control Delay (s/veh) 23.3 14.5 - - 9.4 -
HCM Lane LOS C B - - A -
HCM 95th %tile Q(veh) 0.3 0.4 - - 0.2 -
DRAFT
HCM 7th TWSC 2025 Existing PM Peak Hour
3: Maybank Highway & Fern Hill Drive DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 713 916 4 1 3
Future Vol, veh/h 2 713 916 4 1 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 751 964 4 1 3
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 968 0 - 0 1721 966
Stage 1 - - - - 966 -
Stage 2 - - - - 755 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 711 - - - 98 309
Stage 1 - - - - 369 -
Stage 2 - - - - 464 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 711 - - - 98 309
Mov Cap-2 Maneuver - - - - 98 -
Stage 1 - - - - 367 -
Stage 2 - - - - 464 -
Approach EB WB SB
HCM Control Delay, s/v 0.03 0 23.34
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 5 - - - 200
HCM Lane V/C Ratio 0.003 - - - 0.021
HCM Control Delay (s/veh) 10.1 0 - - 23.3
HCM Lane LOS B A - - C
HCM 95th %tile Q(veh) 0 - - - 0.1
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
2028 NO-BUILD CONDITIONS
DRAFT
Queues 2028 No Build AM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Lane Group EBL EBT WBL WBT NBT NBR SBT
Lane Group Flow (vph) 33 424 16 885 12 23 306
v/c Ratio 0.26 0.43 0.03 0.90 0.03 0.05 0.74
Control Delay (s/veh) 14.6 10.5 7.6 27.0 23.6 5.8 34.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 14.6 10.5 7.6 27.0 23.6 5.8 34.7
Queue Length 50th (ft) 7 94 3 293 4 0 102
Queue Length 95th (ft) 27 173 12 551 18 13 #255
Internal Link Dist (ft) 788 144 973 1748
Turn Bay Length (ft) 150 150
Base Capacity (vph) 185 1446 697 1429 567 632 589
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.18 0.29 0.02 0.62 0.02 0.04 0.52
Intersection Summary
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
DRAFT
HCM 7th Signalized Intersection Summary 2028 No Build AM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 31 380 14 15 714 109 7 4 21 145 15 125
Future Volume (veh/h) 31 380 14 15 714 109 7 4 21 145 15 125
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1826 1841 1870 1870 1841 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 33 409 15 16 768 117 8 4 23 156 16 134
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 5 4 2 2 4 2 2 2 2 2 2 2
Cap, veh/h 238 1078 40 570 953 145 258 114 367 238 28 152
Arrive On Green 0.61 0.61 0.61 0.61 0.61 0.61 0.23 0.23 0.23 0.23 0.23 0.23
Sat Flow, veh/h 613 1764 65 963 1560 238 774 493 1585 721 121 656
Grp Volume(v), veh/h 33 0 424 16 0 885 12 0 23 306 0 0
Grp Sat Flow(s),veh/h/ln 613 0 1829 963 0 1798 1267 0 1585 1498 0 0
Q Serve(g_s), s 3.3 0.0 8.9 0.7 0.0 28.7 0.0 0.0 0.9 14.1 0.0 0.0
Cycle Q Clear(g_c), s 32.0 0.0 8.9 9.6 0.0 28.7 0.4 0.0 0.9 15.0 0.0 0.0
Prop In Lane 1.00 0.04 1.00 0.13 0.67 1.00 0.51 0.44
Lane Grp Cap(c), veh/h 238 0 1118 570 0 1099 372 0 367 418 0 0
V/C Ratio(X) 0.14 0.00 0.38 0.03 0.00 0.81 0.03 0.00 0.06 0.73 0.00 0.00
Avail Cap(c_a), veh/h 298 0 1298 665 0 1276 489 0 500 543 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 23.6 0.0 7.5 9.9 0.0 11.3 22.6 0.0 22.8 28.2 0.0 0.0
Incr Delay (d2), s/veh 0.3 0.0 0.2 0.0 0.0 3.4 0.0 0.0 0.1 3.6 0.0 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.5 0.0 2.8 0.1 0.0 9.5 0.2 0.0 0.3 5.5 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 23.9 0.0 7.7 9.9 0.0 14.7 22.7 0.0 22.9 31.8 0.0 0.0
LnGrp LOS C A A B C C C
Approach Vol, veh/h 457 901 35 306
Approach Delay, s/veh 8.9 14.6 22.8 31.8
Approach LOS A B C C
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 52.5 23.6 52.5 23.6
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 54.0 24.0 54.0 24.0
Max Q Clear Time (g_c+I1), s 34.0 2.9 30.7 17.0
Green Ext Time (p_c), s 6.5 0.1 15.8 0.6
Intersection Summary
HCM 7th Control Delay, s/veh 16.3
HCM 7th LOS B
DRAFT
HCM 7th TWSC 2028 No Build AM Peak Hour
2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 527 20 35 814 24 55
Future Vol, veh/h 527 20 35 814 24 55
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 250 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 3 2 2 4 2 2
Mvmt Flow 573 22 38 885 26 60
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 595 0 1545 584
Stage 1 - - - - 584 -
Stage 2 - - - - 961 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 982 - 126 512
Stage 1 - - - - 558 -
Stage 2 - - - - 371 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 982 - 121 512
Mov Cap-2 Maneuver - - - - 250 -
Stage 1 - - - - 558 -
Stage 2 - - - - 357 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.36 15.42
HCM LOS C
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 250 512 - - 982 -
HCM Lane V/C Ratio 0.104 0.117 - - 0.039 -
HCM Control Delay (s/veh) 21 13 - - 8.8 -
HCM Lane LOS C B - - A -
HCM 95th %tile Q(veh) 0.3 0.4 - - 0.1 -
DRAFT
HCM 7th TWSC 2028 No Build AM Peak Hour
3: Maybank Highway & Fern Hill Drive DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.3
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 35 543 846 1 1 3
Future Vol, veh/h 35 543 846 1 1 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 3 2 2 2
Mvmt Flow 38 590 920 1 1 3
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 921 0 - 0 1586 920
Stage 1 - - - - 920 -
Stage 2 - - - - 666 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 742 - - - 119 328
Stage 1 - - - - 388 -
Stage 2 - - - - 511 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 742 - - - 110 328
Mov Cap-2 Maneuver - - - - 110 -
Stage 1 - - - - 359 -
Stage 2 - - - - 511 -
Approach EB WB SB
HCM Control Delay, s/v 0.61 0 21.75
HCM LOS C
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 109 - - - 219
HCM Lane V/C Ratio 0.051 - - - 0.02
HCM Control Delay (s/veh) 10.1 0 - - 21.7
HCM Lane LOS B A - - C
HCM 95th %tile Q(veh) 0.2 - - - 0.1
DRAFT
Queues 2028 No Build PM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Lane Group EBL EBT WBL WBT NBT NBR SBT
Lane Group Flow (vph) 167 765 20 1050 14 26 173
v/c Ratio 1.08 0.62 0.06 0.87 0.06 0.09 0.66
Control Delay (s/veh) 116.6 8.9 4.0 17.8 33.2 10.0 38.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay (s/veh) 116.6 8.9 4.0 17.8 33.2 10.0 38.9
Queue Length 50th (ft) ~79 162 3 298 5 0 49
Queue Length 95th (ft) #124 241 9 488 25 18 #178
Internal Link Dist (ft) 550 144 973 1748
Turn Bay Length (ft) 150 150
Base Capacity (vph) 208 1656 476 1608 245 312 293
Starvation Cap Reductn 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.80 0.46 0.04 0.65 0.06 0.08 0.59
Intersection Summary
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
DRAFT
HCM 7th Signalized Intersection Summary 2028 No Build PM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 155 687 24 19 738 238 12 1 24 78 10 73
Future Volume (veh/h) 155 687 24 19 738 238 12 1 24 78 10 73
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 167 739 26 20 794 256 13 1 26 84 11 78
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 270 1315 46 463 992 320 219 14 211 148 23 91
Arrive On Green 0.73 0.73 0.73 0.73 0.73 0.73 0.13 0.13 0.13 0.13 0.13 0.13
Sat Flow, veh/h 537 1796 63 702 1355 437 1060 106 1585 662 170 683
Grp Volume(v), veh/h 167 0 765 20 0 1050 14 0 26 173 0 0
Grp Sat Flow(s),veh/h/ln 537 0 1859 702 0 1792 1166 0 1585 1514 0 0
Q Serve(g_s), s 26.0 0.0 16.7 1.2 0.0 33.8 0.0 0.0 1.3 8.9 0.0 0.0
Cycle Q Clear(g_c), s 59.8 0.0 16.7 17.9 0.0 33.8 0.9 0.0 1.3 9.9 0.0 0.0
Prop In Lane 1.00 0.03 1.00 0.24 0.93 1.00 0.49 0.45
Lane Grp Cap(c), veh/h 270 0 1361 463 0 1312 233 0 211 262 0 0
V/C Ratio(X) 0.62 0.00 0.56 0.04 0.00 0.80 0.06 0.00 0.12 0.66 0.00 0.00
Avail Cap(c_a), veh/h 275 0 1377 469 0 1327 235 0 213 264 0 0
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 0.00
Uniform Delay (d), s/veh 27.1 0.0 5.4 9.5 0.0 7.7 33.8 0.0 34.0 37.7 0.0 0.0
Incr Delay (d2), s/veh 4.0 0.0 0.5 0.0 0.0 3.6 0.1 0.0 0.3 5.9 0.0 0.0
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 3.4 0.0 4.5 0.2 0.0 9.7 0.3 0.0 0.5 4.1 0.0 0.0
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 31.1 0.0 5.9 9.5 0.0 11.3 33.9 0.0 34.3 43.6 0.0 0.0
LnGrp LOS C A A B C C D
Approach Vol, veh/h 932 1070 40 173
Approach Delay, s/veh 10.5 11.3 34.2 43.6
Approach LOS B B C D
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 71.2 17.9 71.2 17.9
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 66.0 12.0 66.0 12.0
Max Q Clear Time (g_c+I1), s 61.8 3.3 35.8 11.9
Green Ext Time (p_c), s 3.4 0.0 23.2 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 13.9
HCM 7th LOS B
DRAFT
HCM 7th TWSC 2028 No Build PM Peak Hour
2: St. Johns Woods Parkway & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 1.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 769 20 66 972 23 56
Future Vol, veh/h 769 20 66 972 23 56
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - 250 - 0 0
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 809 21 69 1023 24 59
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 831 0 1982 820
Stage 1 - - - - 820 -
Stage 2 - - - - 1162 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 802 - 68 375
Stage 1 - - - - 433 -
Stage 2 - - - - 298 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 802 - 62 375
Mov Cap-2 Maneuver - - - - 179 -
Stage 1 - - - - 433 -
Stage 2 - - - - 272 -
Approach EB WB NB
HCM Control Delay, s/v 0 0.63 19.84
HCM LOS C
Minor Lane/Major Mvmt NBLn1 NBLn2 EBT EBR WBL WBT
Capacity (veh/h) 179 375 - - 802 -
HCM Lane V/C Ratio 0.135 0.157 - - 0.087 -
HCM Control Delay (s/veh) 28.3 16.4 - - 9.9 -
HCM Lane LOS D C - - A -
HCM 95th %tile Q(veh) 0.5 0.6 - - 0.3 -
DRAFT
HCM 7th TWSC 2028 No Build PM Peak Hour
3: Maybank Highway & Fern Hill Drive DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 801 1034 4 1 3
Future Vol, veh/h 2 801 1034 4 1 3
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 843 1088 4 1 3
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 1093 0 - 0 1938 1091
Stage 1 - - - - 1091 -
Stage 2 - - - - 847 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 639 - - - 72 261
Stage 1 - - - - 322 -
Stage 2 - - - - 420 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 639 - - - 72 261
Mov Cap-2 Maneuver - - - - 72 -
Stage 1 - - - - 320 -
Stage 2 - - - - 420 -
Approach EB WB SB
HCM Control Delay, s/v 0.03 0 28.54
HCM LOS D
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 4 - - - 157
HCM Lane V/C Ratio 0.003 - - - 0.027
HCM Control Delay (s/veh) 10.7 0 - - 28.5
HCM Lane LOS B A - - D
HCM 95th %tile Q(veh) 0 - - - 0.1
DRAFT
DRB Maybank Residential Development
Traffic Impact Study
2028 BUILD CONDITIONS
DRAFT
HCM 7th TWSC 2028 Build AM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 2 412 14 29 837 9 7 4 21 11 1 10
Future Vol, veh/h 2 412 14 29 837 9 7 4 21 11 1 10
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 50 - - - - 0 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 5 4 2 2 4 2 2 2 2 2 2 2
Mvmt Flow 2 443 15 31 900 10 8 4 23 12 1 11
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 910 0 0 458 0 0 1418 1427 451 1417 1430 905
Stage 1 - - - - - - 455 455 - 967 967 -
Stage 2 - - - - - - 963 972 - 449 462 -
Critical Hdwy 4.15 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.245 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 736 - - 1103 - - 115 135 609 115 135 335
Stage 1 - - - - - - 585 569 - 306 332 -
Stage 2 - - - - - - 307 331 - 589 564 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 736 - - 1103 - - 107 131 609 104 130 335
Mov Cap-2 Maneuver - - - - - - 107 131 - 104 130 -
Stage 1 - - - - - - 583 567 - 297 323 -
Stage 2 - - - - - - 288 321 - 561 563 -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0.05 0.28 21.1 32.76
HCM LOS C D
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 114 609 736 - - 1103 - - 153
HCM Lane V/C Ratio 0.103 0.037 0.003 - - 0.028 - - 0.154
HCM Ctrl Dly (s/v) 40.1 11.1 9.9 - - 8.4 - - 32.8
HCM Lane LOS E B A - - A - - D
HCM 95th %tile Q(veh) 0.3 0.1 0 - - 0.1 - - 0.5
DRAFT
HCM 7th Signalized Intersection Summary 2028 Build AM Peak Hour
2: St. Johns Woods Parkway/Project Driveway #1 & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 32 461 20 35 717 103 24 0 55 147 0 134
Future Volume (veh/h) 32 461 20 35 717 103 24 0 55 147 0 134
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1856 1870 1870 1841 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 35 501 22 38 779 112 26 0 60 160 0 146
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Percent Heavy Veh, % 2 3 2 2 4 2 2 2 2 2 2 2
Cap, veh/h 353 1228 54 610 1096 158 104 0 206 233 0 206
Arrive On Green 0.70 0.70 0.70 0.70 0.70 0.70 0.13 0.00 0.13 0.13 0.00 0.13
Sat Flow, veh/h 624 1764 77 879 1574 226 1242 0 1585 990 0 1585
Grp Volume(v), veh/h 35 0 523 38 0 891 26 0 60 160 0 146
Grp Sat Flow(s),veh/h/ln 624 0 1842 879 0 1800 1242 0 1585 990 0 1585
Q Serve(g_s), s 2.5 0.0 8.3 1.3 0.0 20.6 0.0 0.0 2.4 6.6 0.0 6.1
Cycle Q Clear(g_c), s 23.1 0.0 8.3 9.7 0.0 20.6 9.0 0.0 2.4 9.0 0.0 6.1
Prop In Lane 1.00 0.04 1.00 0.13 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 353 0 1282 610 0 1253 104 0 206 233 0 206
V/C Ratio(X) 0.10 0.00 0.41 0.06 0.00 0.71 0.25 0.00 0.29 0.69 0.00 0.71
Avail Cap(c_a), veh/h 541 0 1839 876 0 1797 104 0 206 233 0 206
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 13.3 0.0 4.5 6.5 0.0 6.3 34.6 0.0 27.2 31.9 0.0 28.8
Incr Delay (d2), s/veh 0.1 0.0 0.2 0.0 0.0 0.8 1.2 0.0 0.8 8.1 0.0 10.6
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 0.3 0.0 1.9 0.2 0.0 4.7 0.5 0.0 0.9 3.1 0.0 2.8
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 13.4 0.0 4.7 6.5 0.0 7.1 35.8 0.0 27.9 40.0 0.0 39.3
LnGrp LOS B A A A D C D D
Approach Vol, veh/h 558 929 86 306
Approach Delay, s/veh 5.2 7.1 30.3 39.7
Approach LOS A A C D
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 54.1 15.0 54.1 15.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 69.0 9.0 69.0 9.0
Max Q Clear Time (g_c+I1), s 25.1 11.0 22.6 11.0
Green Ext Time (p_c), s 11.7 0.0 25.5 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 12.9
HCM 7th LOS B
DRAFT
HCM 7th TWSC 2028 Build AM Peak Hour
3: Maybank Highway & Fern Hill Drive DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 35 556 848 5 4 7
Future Vol, veh/h 35 556 848 5 4 7
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 3 2 2 2
Mvmt Flow 38 604 922 5 4 8
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 927 0 - 0 1605 924
Stage 1 - - - - 924 -
Stage 2 - - - - 680 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 737 - - - 116 326
Stage 1 - - - - 386 -
Stage 2 - - - - 503 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 737 - - - 107 326
Mov Cap-2 Maneuver - - - - 107 -
Stage 1 - - - - 356 -
Stage 2 - - - - 503 -
Approach EB WB SB
HCM Ctrl Dly, s/v 0.6 0 25.58
HCM LOS D
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 107 - - - 187
HCM Lane V/C Ratio 0.052 - - - 0.064
HCM Ctrl Dly (s/v) 10.1 0 - - 25.6
HCM Lane LOS B A - - D
HCM 95th %tile Q(veh) 0.2 - - - 0.2
DRAFT
HCM 7th TWSC 2028 Build AM Peak Hour
4: Fern Hill Drive & Cross Island Extension DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 5.1
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 7 4 2 4 0
Future Vol, veh/h 0 7 4 2 4 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 8 4 2 4 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 16 4 4 0 - 0
Stage 1 4 - - - - -
Stage 2 11 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 1003 1079 1617 - - -
Stage 1 1019 - - - - -
Stage 2 1012 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 1000 1079 1617 - - -
Mov Cap-2 Maneuver 1000 - - - - -
Stage 1 1016 - - - - -
Stage 2 1012 - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 8.36 4.82 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1200 - 1079 - -
HCM Lane V/C Ratio 0.003 - 0.007 - -
HCM Ctrl Dly (s/v) 7.2 0 8.4 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
DRAFT
HCM 7th TWSC 2028 Build AM Peak Hour
5: Project Driveway #1 & Cross Island Extension DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 3.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 2 264 10 7 110 2
Future Vol, veh/h 2 264 10 7 110 2
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 293 11 8 122 2
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 296 0 179 149
Stage 1 - - - - 149 -
Stage 2 - - - - 30 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1266 - 811 898
Stage 1 - - - - 879 -
Stage 2 - - - - 993 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1266 - 804 898
Mov Cap-2 Maneuver - - - - 804 -
Stage 1 - - - - 879 -
Stage 2 - - - - 984 -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 4.63 10.29
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 805 - - 1059 -
HCM Lane V/C Ratio 0.155 - - 0.009 -
HCM Ctrl Dly (s/v) 10.3 - - 7.9 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 0.5 - - 0 -
DRAFT
HCM 7th TWSC 2028 Build AM Peak Hour
6: Southwick Drive & Cross Island Extension DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.4
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 266 22 0 117 15 0
Future Vol, veh/h 266 22 0 117 15 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 296 24 0 130 17 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 320 0 438 308
Stage 1 - - - - 308 -
Stage 2 - - - - 130 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1240 - 576 732
Stage 1 - - - - 745 -
Stage 2 - - - - 896 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1240 - 576 732
Mov Cap-2 Maneuver - - - - 576 -
Stage 1 - - - - 745 -
Stage 2 - - - - 896 -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 11.43
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 576 - - 1240 -
HCM Lane V/C Ratio 0.029 - - - -
HCM Ctrl Dly (s/v) 11.4 - - 0 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.1 - - 0 -
DRAFT
HCM 7th TWSC 2028 Build PM Peak Hour
1: Plaza Entrance/Southwick Drive & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 1.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 14 837 24 28 811 19 12 1 24 6 1 6
Future Vol, veh/h 14 837 24 28 811 19 12 1 24 6 1 6
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 0 0 0 0
Sign Control Free Free Free Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length 150 - - 50 - - - - 0 - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 93 93 93 93 93 93 93 93 93 93 93 93
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 15 900 26 30 872 20 13 1 26 6 1 6
Major/Minor Major1 Major2 Minor1 Minor2
Conflicting Flow All 892 0 0 926 0 0 1876 1896 913 1873 1898 882
Stage 1 - - - - - - 943 943 - 942 942 -
Stage 2 - - - - - - 933 953 - 931 956 -
Critical Hdwy 4.12 - - 4.12 - - 7.12 6.52 6.22 7.12 6.52 6.22
Critical Hdwy Stg 1 - - - - - - 6.12 5.52 - 6.12 5.52 -
Critical Hdwy Stg 2 - - - - - - 6.12 5.52 - 6.12 5.52 -
Follow-up Hdwy 2.218 - - 2.218 - - 3.518 4.018 3.318 3.518 4.018 3.318
Pot Cap-1 Maneuver 760 - - 738 - - 55 70 331 55 69 345
Stage 1 - - - - - - 315 341 - 315 341 -
Stage 2 - - - - - - 319 338 - 320 337 -
Platoon blocked, % - - - -
Mov Cap-1 Maneuver 760 - - 738 - - 50 65 331 47 65 345
Mov Cap-2 Maneuver - - - - - - 50 65 - 47 65 -
Stage 1 - - - - - - 309 334 - 303 327 -
Stage 2 - - - - - - 300 324 - 289 330 -
Approach EB WB NB SB
HCM Ctrl Dly, s/v 0.16 0.33 46.51 58.6
HCM LOS E F
Minor Lane/Major Mvmt NBLn1 NBLn2 EBL EBT EBR WBL WBT WBR SBLn1
Capacity (veh/h) 51 331 760 - - 738 - - 81
HCM Lane V/C Ratio 0.276 0.078 0.02 - - 0.041 - - 0.173
HCM Ctrl Dly (s/v) 101.4 16.8 9.8 - - 10.1 - - 58.6
HCM Lane LOS F C A - - B - - F
HCM 95th %tile Q(veh) 0.9 0.3 0.1 - - 0.1 - - 0.6
DRAFT
HCM 7th Signalized Intersection Summary 2028 Build PM Peak Hour
2: St. Johns Woods Parkway/Project Driveway #1 & Maybank Highway DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (veh/h) 150 697 20 66 756 226 23 0 56 81 0 79
Future Volume (veh/h) 150 697 20 66 756 226 23 0 56 81 0 79
Initial Q (Qb), veh 0 0 0 0 0 0 0 0 0 0 0 0
Lane Width Adj. 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Ped-Bike Adj(A_pbT) 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Parking Bus, Adj 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Work Zone On Approach No No No No
Adj Sat Flow, veh/h/ln 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870 1870
Adj Flow Rate, veh/h 158 734 21 69 796 238 24 0 59 85 0 83
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Percent Heavy Veh, % 2 2 2 2 2 2 2 2 2 2 2 2
Cap, veh/h 310 1357 39 496 1037 310 99 0 170 183 0 170
Arrive On Green 0.75 0.75 0.75 0.75 0.75 0.75 0.11 0.00 0.11 0.11 0.00 0.11
Sat Flow, veh/h 546 1809 52 709 1383 413 1315 0 1585 911 0 1585
Grp Volume(v), veh/h 158 0 755 69 0 1034 24 0 59 85 0 83
Grp Sat Flow(s),veh/h/ln 546 0 1861 709 0 1796 1315 0 1585 911 0 1585
Q Serve(g_s), s 20.2 0.0 14.3 3.8 0.0 28.5 0.8 0.0 2.9 5.3 0.0 4.1
Cycle Q Clear(g_c), s 48.7 0.0 14.3 18.1 0.0 28.5 9.0 0.0 2.9 8.2 0.0 4.1
Prop In Lane 1.00 0.03 1.00 0.23 1.00 1.00 1.00 1.00
Lane Grp Cap(c), veh/h 310 0 1396 496 0 1347 99 0 170 183 0 170
V/C Ratio(X) 0.51 0.00 0.54 0.14 0.00 0.77 0.24 0.00 0.35 0.46 0.00 0.49
Avail Cap(c_a), veh/h 349 0 1528 547 0 1475 99 0 170 183 0 170
HCM Platoon Ratio 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00
Upstream Filter(I) 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00 1.00 0.00 1.00
Uniform Delay (d), s/veh 20.5 0.0 4.4 8.2 0.0 6.2 41.8 0.0 34.8 38.6 0.0 35.3
Incr Delay (d2), s/veh 1.3 0.0 0.3 0.1 0.0 2.3 1.3 0.0 1.2 1.8 0.0 2.2
Initial Q Delay(d3), s/veh 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
%ile BackOfQ(50%),veh/ln 2.4 0.0 3.3 0.5 0.0 6.9 0.5 0.0 1.2 1.8 0.0 1.7
Unsig. Movement Delay, s/veh
LnGrp Delay(d), s/veh 21.8 0.0 4.7 8.4 0.0 8.5 43.0 0.0 36.0 40.4 0.0 37.5
LnGrp LOS C A A A D D D D
Approach Vol, veh/h 913 1103 83 168
Approach Delay, s/veh 7.7 8.5 38.0 39.0
Approach LOS A A D D
Timer - Assigned Phs 2 4 6 8
Phs Duration (G+Y+Rc), s 69.0 15.0 69.0 15.0
Change Period (Y+Rc), s 6.0 6.0 6.0 6.0
Max Green Setting (Gmax), s 69.0 9.0 69.0 9.0
Max Q Clear Time (g_c+I1), s 50.7 11.0 30.5 10.2
Green Ext Time (p_c), s 12.3 0.0 28.0 0.0
Intersection Summary
HCM 7th Control Delay, s/veh 11.5
HCM 7th LOS B
DRAFT
HCM 7th TWSC 2028 Build PM Peak Hour
3: Maybank Highway & Fern Hill Drive DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.2
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 2 810 1041 15 3 6
Future Vol, veh/h 2 810 1041 15 3 6
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 95 95 95 95 95 95
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 2 853 1096 16 3 6
Major/Minor Major1 Major2 Minor2
Conflicting Flow All 1112 0 - 0 1961 1104
Stage 1 - - - - 1104 -
Stage 2 - - - - 857 -
Critical Hdwy 4.12 - - - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy 2.218 - - - 3.518 3.318
Pot Cap-1 Maneuver 628 - - - 70 257
Stage 1 - - - - 317 -
Stage 2 - - - - 416 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 628 - - - 69 257
Mov Cap-2 Maneuver - - - - 69 -
Stage 1 - - - - 315 -
Stage 2 - - - - 416 -
Approach EB WB SB
HCM Ctrl Dly, s/v 0.03 0 33.68
HCM LOS D
Minor Lane/Major Mvmt EBL EBT WBT WBR SBLn1
Capacity (veh/h) 4 - - - 135
HCM Lane V/C Ratio 0.003 - - - 0.07
HCM Ctrl Dly (s/v) 10.7 0 - - 33.7
HCM Lane LOS B A - - D
HCM 95th %tile Q(veh) 0 - - - 0.2
DRAFT
HCM 7th TWSC 2028 Build PM Peak Hour
4: Fern Hill Drive & Cross Island Extension DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 4.5
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 5 11 7 4 0
Future Vol, veh/h 0 5 11 7 4 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 6 12 8 4 0
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 37 4 4 0 - 0
Stage 1 4 - - - - -
Stage 2 32 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 976 1079 1617 - - -
Stage 1 1019 - - - - -
Stage 2 990 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 968 1079 1617 - - -
Mov Cap-2 Maneuver 968 - - - - -
Stage 1 1011 - - - - -
Stage 2 990 - - - - -
Approach EB NB SB
HCM Ctrl Dly, s/v 8.35 4.43 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1100 - 1079 - -
HCM Lane V/C Ratio 0.008 - 0.005 - -
HCM Ctrl Dly (s/v) 7.2 0 8.4 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
DRAFT
HCM 7th TWSC 2028 Build PM Peak Hour
5: Project Driveway #1 & Cross Island Extension DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 7.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 7 150 7 5 312 5
Future Vol, veh/h 7 150 7 5 312 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 167 8 6 347 6
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 174 0 112 91
Stage 1 - - - - 91 -
Stage 2 - - - - 21 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1402 - 884 966
Stage 1 - - - - 932 -
Stage 2 - - - - 1002 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1402 - 880 966
Mov Cap-2 Maneuver - - - - 880 -
Stage 1 - - - - 932 -
Stage 2 - - - - 996 -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 4.42 11.78
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 881 - - 1050 -
HCM Lane V/C Ratio 0.4 - - 0.006 -
HCM Ctrl Dly (s/v) 11.8 - - 7.6 0
HCM Lane LOS B - - A A
HCM 95th %tile Q(veh) 1.9 - - 0 -
DRAFT
HCM 7th TWSC 2028 Build PM Peak Hour
6: Southwick Drive & Cross Island Extension DRB Maybank TIA
Kimley-Horn Synchro 12 Report
Intersection
Int Delay, s/veh 0.8
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 157 13 0 317 34 0
Future Vol, veh/h 157 13 0 317 34 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 90 90 90 90 90 90
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 174 14 0 352 38 0
Major/Minor Major1 Major2 Minor1
Conflicting Flow All 0 0 189 0 534 182
Stage 1 - - - - 182 -
Stage 2 - - - - 352 -
Critical Hdwy - - 4.12 - 6.42 6.22
Critical Hdwy Stg 1 - - - - 5.42 -
Critical Hdwy Stg 2 - - - - 5.42 -
Follow-up Hdwy - - 2.218 - 3.518 3.318
Pot Cap-1 Maneuver - - 1385 - 507 861
Stage 1 - - - - 850 -
Stage 2 - - - - 712 -
Platoon blocked, % - - -
Mov Cap-1 Maneuver - - 1385 - 507 861
Mov Cap-2 Maneuver - - - - 507 -
Stage 1 - - - - 850 -
Stage 2 - - - - 712 -
Approach EB WB NB
HCM Ctrl Dly, s/v 0 0 12.67
HCM LOS B
Minor Lane/Major Mvmt NBLn1 EBT EBR WBL WBT
Capacity (veh/h) 507 - - 1385 -
HCM Lane V/C Ratio 0.075 - - - -
HCM Ctrl Dly (s/v) 12.7 - - 0 -
HCM Lane LOS B - - A -
HCM 95th %tile Q(veh) 0.2 - - 0 -
DRAFT
DRAWING No.
SHEET No.
REVISIONS DRAWN BYDATE
DESIGNED BY
REVIEWED BY
DATE
DATE
DATE
363 Wando Place Drive
Suite 200
Mt. Pleasant, SC 29464
Phone (843) 971-8520
Fax (843) 971-8522
J:\South Carolina\2024\SC-24esa4324\GIS\2025\Delineation_Supplement_031325\Delineation_Supplement_031325.aprx 4/4/2025 1:49 PM CalebO
5
5
5
5
5
5
5
5
5
5
5
55
5
5
5
5
5
5
5
TRIBUTARY 1
(0.04 Ac.±)
(510 Lf.±)
WETLAND 2
(0.13 Ac.±)
WETLAND 3
(0.20 Ac.±)
WETLAND 1
(0.88 Ac.±)
UPLAND
(1.13 Ac.±)
UPLAND
(3.99 Ac.±)
POND 1
(0.10 Ac.±)
UPLAND
(7.02 Ac.±)
¿À700
SALVO LNSALVO LN
FERN HILL DRFERN HILL DR1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
LEGEND
MAYBANK AT FERNHILL
WETLAND
POND
TRIBUTARY
SC-24ESA4324
EXHIBIT 7
MAYBANK AT FERNHILL
AERIAL WITH BOUNDARY COORDINATES AND FEATURES
3/13/25S.R.
3/13/25S.R.
3/13/25C.O.
0 100 200
Feet
¶
NOTES:
AERIAL PHOTOGRAPHS WERE ACQUIRED FROM
THE SOUTH CAROLINA REVENUE AND FISCAL
AFFAIRS OFFICE WITH FLIGHT DATES OF
JANUARY THROUGH FEBRUARY 2023.
PROPERTY BOUNDARY ESTIMATED FROM THE
CHARLESTON COUNTY GIS WEBSITE.
UPLAND/WETLAND LIMITS HAVE NOT
BEEN REVIEWED BY ANY REGULATORY
AGENCY AND ARE SUBJECT TO CHANGE.
PROJECT LOCATION
Map No. Latitude Longitude
1 32.732962 -80.067394
2 32.733299 -80.066734
3 32.733126 -80.066608
4 32.733713 -80.066286
5 32.733875 -80.066006
6 32.734135 -80.065279
7 32.733592 -80.064972
8 32.733981 -80.064497
9 32.733818 -80.064392
10 32.733567 -80.064179
11 32.733425 -80.064028
12 32.733129 -80.064608
13 32.733076 -80.064563
14 32.732407 -80.065849
15 32.730111 -80.064159
16 32.729817 -80.06471
17 32.731983 -80.066346
18 32.731899 -80.066508
19 32.732015 -80.066594
20 32.731936 -80.066745
% OF
TYPE ACREAGE LINEAR FEET TOTAL
POND 0.10 Ac.± - 0.7%
TRIBUTARY 0.04 Ac.± - 0.3%
UPLAND 12.14 Ac.± - 90.0%
WETLAND 1.21 Ac.± 510 Lf.± 9.0%
TOTAL 13.49 Ac.± 510 Lf.± 100.0%
PROJECT ACREAGE TABLE