RecordWell Data

TRC Meeting Results 3-12-2026- 1st Review Maybank PUD and Concept Plan

City of Charleston · Berkeley County · meeting of Oct 21, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Charleston Department of Parks Technical Review Committee Comments Submitted by: Rodney H. Porter, PLA porterr@charleston-sc.gov City of Charleston, Department of Parks, 823 Meeting Street, Charleston, SC 29403 843.637.9518 (m), 843.724.7322 (o) EREVIEW COMMENTS ______ COMMENTS ______ NO COMMENTS 1. There are no comments. PROJECT ID: PUD2026 -000033 AGENDA #: 2 PROJECT NAME: MAYBANK PUD AND CONCEPT PLAN DATE: 03/12 /202 6 ADDRESS: 3298 MAYBANK HWY REVIEW: 1ST REVIEW TMS #: C2790000010 REVIEW TYPE: PUD AND CONCEPT PLAN Approval Conditional Approval Comments Agenda Item #_02_ 1 CITY OF CHARLESTON DEPARTMENT OF TRAFFIC & TRANSPORTATION TRC REQUIREMENTS TRANSPORTATION PROJECT MANAGEMENT DIVISION (843) 724-7372 WallaceJ@charleston-sc.gov SITE: Maybank PUD and Concept Plan DATE: 3/12/2026 TMS #: 279-00-00-010 PLEASE NOTE: Final approval is contingent upon implementation of comments. 1st Review Comments: TRC-PUD2026-000033 1. SCDOT will probably require a signal warrant analysis as part of the TIS to allow the signal at the intersection of Maybank Hwy. and St. Johns Woods Pkwy./Project Driveway #1. Coordinate with SCDOT to see what is needed for a signal authorization letter. 2. Site plan shows a three-lane approach to Maybank Hwy. on Site Driveway #1, TIS recommends a right turn and through/left turn lane. Update the site plan to match the TIS recommended lane configuration. 3. Show the proposed restriped EB left turn lane on Maybank Hwy. at Site Driveway #1 on the site plan. 4. Plans must indicate driveway separation distances and distances to the nearest intersections. TECHNICAL REVIEW COMMITTEE Zoning Division Comments March 12, 2026 Prepared by: Eric Schultz, #843.724.3790 or Schultze@charleston-sc.gov Agenda Item #2 – 3298 Maybank Hwy., Maybank PUD & CP . TMS # 279-00-00-010, etal. General Zoning /PUD Document: 1. Provide the City’s project ID # on the title sheet of the PUD text document and CP plans , TRC -SP20 26-000 033 2. 2.05. – Is the new street going to be name d Southwick , don’t think so. Therefore , should read ..Park way with a new named st reet will create …… 3. 3.03. – Is GB recomme nded by Planning ? 4. 4.01. B. – Tables. OCRM (B CM?) Critical Line B uffer ? Do you mea n freshwater wetland buff er? 5. 5.01. QC Gross acres ( di fferent number in Sec. 3.01.), QC minimum acr es required. 6. 8.01. – use of Southwick again = new named street ? 7. 8.02 – Verify no gutter (asphalt to concrete face of the stand -up curb? 8. Provide a col or -coded street type map, color on str eet types (A -C) shall correspond with the proposed cross -sectio n. 9. Study looping the alley or providing pedestr ian way at the buffer line (shifting units toward the wetland ) and eliminate the emergency turn -a- round in the buffer. CP Exhibi ts: 10. Provid e the entire boundar y o f the PUD limits. 11. Note the different government jurisdictions on either side of com mon boundar y li nes. 12. On the land -use pla n, clearly identify the different land -use categories , col or legen d/graphic. 13. Provide the proposed street cross -sections. 14. Grand tr ees to be addressed as per P UD text. WILLIAM S. COGSWELL, JR. City of Charleston ROBERT SUMMERFIELD MAYOR MAYOR DIRECTOR Department of Planning, Preservation and Sustainability 2 G E O R G E S T R E E T • C H A R L E S T O N , S O U T H C A R O L I N A • 2 9 4 0 1- 3506 P H O N E : ( 8 4 3 ) 7 2 4 - 3 7 6 5 • F A X : ( 8 4 3 ) 7 2 4- 3772 T H E CHARLESTON FIRE DEPARTMENT Fire Marshal Division Permit Application & Plan Review Comments 2 GEORGE ST, CHARLESTON, SOUTH CAROLINA 29401 • PHONE (843) 724-3429• FAX (843) 720-5857 Version: 06/06/2018 Project Project Status Name: Maybank PUD concept plan Status: Hold - see comments Address: 3298 Maybank Hwy Received: March 2, 2026 Type: Site Plan Review Reviewed: March 11, 2026 Submittal: Initial submittal review Revised plans required: Yes Permit #: PUD2026-000033 Written response required: Yes Project Contact Fire Plans Reviewer Name: Andrew Todd-Burke Name: Rick Fluegge Company: Kimley-Horn and Associates Title: Deputy Fire Marshal Phone: Phone: (843)724-5893 Applicant’s Email: Andrew.todd-burke@kimley-horn.com Reviewer’s Email: fluegger@charleston-sc.gov Thank you for your recent submittal. We look forward to working with you throughout this project in order to ensure the safety of our citizens and our emergency responders. Please submit a written response to the following comments and annotate these corrections on the revised drawings. Response letters must list explanations in the same order as the comments appear on this review letter. Permits will not be issued until all items have been reviewed and work shall not commence until the issuance of the permit. Please be sure to address all items on the review in order to expedite the review process. General: 1. Provide the construction type (SCBC), total square footage, stories above and below grade. 2. The 500’ radius circle that is shown around the proposed hydrant locations is of little value during plan review. The 500’ distance to a building is measured along the normal routes of fire department vehicle access as the hose discharges off the apparatus. Please remove the circle. 3. Provide the available fire flow at the site, measured at 20 PSI residual pressure, available for firefighting. 4. Indicate the required fire flow in accordance with an acceptable calculation method. Basic guidance may be found in Appendix B of the SCFC. Flow rate reductions must be submitted for review and approval. 5. The required water supply for fire protection must be made available prior to combustible construction material arrival at the site as required by SCFC 3313.1. 6. In the event the required fire department vehicle access roads is only 20’ in width, provide “No on street parking” signs or an equivalent. 7. All residential dwellings associated supporting building systems (e.g. electrical services, fire-pump, fire-alarm, HVAC units and ductwork, hot water heaters, etc.), and residential ancillary spaces within mixed-use commercial buildings are prohibited below DFE and are not permitted to be dry floodproofed. Refer to FEMA Technical Bulletin 3. For additional information, please contact Caroline Schnell, City of Charleston Floodplain Management Manager. She can be reached at (843) 579-6481 or via e-mail at schnellc@charleston-sc.gov. 8. Please coordinate with City GIS regarding the address for the property. Street address shall be posted in not less than 4- inch letters/numbers (recommend 6 inch) in a manner that is plainly visible from the street or road fronting the property as required by SCFC section 505.1. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Individual suites or subdivision within the building shall include the suite designation in a 4-inch minimum letter/number. Street marquees shall include the site address. Plan review by this office does not include a check of every item and does not relieve the owner, contractor, or designer of meeting all code requirements. Issuance of a permit shall not be construed as authority to violate local, State, or Federal rules or regulations. Work commencing prior to permitting may result in double permit fees and/or fines. Department of Stormwater Management Page 1 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 Date: 3/10/26 To: Kimley-Horn Andrew Todd-Burke Andrew.Todd-Burke@kimley-horn.com From: Ardurra Jason Sesler jsesler@ardurra.com cc: City of Charleston Bucci, Ron buccir@charleston-sc.gov Giralo, Anthony Giraloa@charleston-sc.gov Lewis, Alicia lewisa@charleston-sc.gov Project Name: Maybank PUD Project Type: PUD and Concept Plan Project ID #: PUD2026-000033 TMS #: 2790000017, -008, -009, -010, -288, 3130000047, -237 Submittal Review #: 1st Review – Comments provided *Comments provided for 1st Review Submittal on 2/23/2026. # SHEET / PAGE # COMMENT RESOLUTION 1 --- While some specific comments have been provided, a complete review cannot be performed until all required forms, documentation and design in conformance with the City of Charleston Stormwater Design Standards Manual (SWDSM) and TRC Procedure Manual are provided. 2 Construction Activity Application (CAA) Provide a completed, original Construction Activity Application (CAA) using the most current version provided in the City’s Stormwater Design Standards Manual (SWDSM). A fillable form version is available at https://www.charleston-sc.gov/351/Stormwater-Design-Standards-Manual. 3 CAA Provide stormwater plan review fee: $500.00 base fee plus $200.00 per disturbed acre rounded up to the next whole acre (up to $5,000.00 maximum fee). Please reach out to the Stormwater Administrator to generate an invoice for this fee. PUD Plan Set Comments 1 All Plan Sheets Please update labels of Stormwater Management Devices to tie into the 2025 Stormwater Design Manual BMPs. If utilizing Wet Pond, change label to Wet Detention Pond. If the design is utilizing Bioretention, Department of Stormwater Management Page 2 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION change label to Bioretention Basin. If utilizing Infiltration Basin, change label to Infiltration Basin. 2 Ensure Stormwater BMP designs adhere to City 2025 Stormwater Design Manual and Low Impact Development in Coastal South Carolina: A Planning and Design Guide. 3 Survey Sheet Survey sheets need to include survey of Project Area of Lot 6 & Lot 7 of Charleston Real Estate. 4 C3-00 (Grading and Drainage Plan) Per Section 3.9.3, All designs must also account for the discharge rates and volumes into the downstream and adjacent properties if proper easements and permissions are not in place. Unless the discharge rates and total volumes for the site’s discharge locations onto downstream and adjacent properties match the pre-development conditions, a legal right from that property owner or a proper drainage easement for any increase in runoff rates and volumes would be required. There are several locations where onsite rear of LOTS drainage is discharging offsite to adjacent properties and not draining to Stormwater Management Devices. Examples include LOTS 46-49, unclear if LOTS 50-53 drain to proposed Pond 1, LOTS 33-37, and LOTS 44-45. In addition Pond #4 outlet pipe discharges offsite onto an adjacent property, and the outlet pipe extends onto the adjacent offsite property. 5 Wet Pond Aquatic Bench: The proposed wet detention ponds must incorporate aquatic benches in accordance with section 3.10.3 of the SWDSM. This will have an effect on the configuration of the ponds as presented in the concept plan. Please revise the design to account for the contours associated with the aquatic benches. A minimum 10-foot-wide aquatic bench around the perimeter of the wet stormwater detention facility (with exception of the forebay area) with the inside edge of the shelf 6” Department of Stormwater Management Page 3 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION below the permanent pool level and the outside edge 6” above the permanent pool level with a resulting slope of 10H:1V. 6 Wet Pond The wet stormwater detention facility must incorporate several (minimum of three (3)) diverse native species of shallow water emergent and shall land herbaceous vegetation on the vegetated shelf. Landscaping meets requirements of the Wet Detention Practice Landscaping Criteria. 7 Wet Pond Bottom of all detention and retention ponds graded shall have a slope of not less than 0.5% towards the outlet structure(s) and side slopes no steeper than 3:1 unless adequately protected. 8 Wet Pond Total water balance and base flow conversion computed using Equation 4.11-1 and 4.11-2 or other approved methodology in Low Impact Development in Coastal South Carolina manual. 9 Wet Pond Documentation that the permanent pools will not draw down by more than 2' after a 30-day summer drought (see equations in Wet Detention Pond Design Criteria in Low Impact Development in Coastal South Carolina manual) 10 Wet Pond Geotechnical testing and analysis as necessary (see under table 4.11-1 in Low Impact Development in Coastal South Carolina manual). 11 Stormwater Management BMPs Geotechnical testing and analysis as required per City 2025 design manual and Low Impact Development in Coastal South Carolina manual). Infiltration rates, seasonal high water table, number of tests, etc. to be determined. Refer to Appendix B in LID in Coastal South Carolina manual and City Design Manual Sections 3.10.4, Section 6.9, Technical Procedure Document #9. Department of Stormwater Management Page 4 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 12 Wet Pond Permanent pool depth not to exceed 8' or be less than 3'. The 4 wet ponds as currently shown and modeled are not providing the required min. 3’ permanent pool depth. 13 Wet Pond/Detention Pond Per Section 3.16, An access easement with a width of 20 feet, minimum, shall be provided from the right-of-way to the pond. In addition, the entire pond and sufficient access room on the perimeter shall be included as part of the drainage easement that will include a minimum width of 20 feet outward from the top of the bank for the bench. The perimeter easement around the top of the bank of a pond shall have a maximum cross slope of 10H:1V. 14 WQv & Wet Pond Determine the rainfall depth to be used for WQv required based on Table 3-6 (tiered system, see equation 3-1). Note that WQv is based on the rainfall depth applied to the entire construction project area. Different tiers may be used for different portions of the site if different practices are used. Designer may manage more on one area than other to compensate for portions where they cannot obtain water quality volume. Wet Ponds (Detention) are Tier III = 2.8. 15 Wet Pond Ponds need to show the stage of the water quality volume based on the rainfall depth and show that the pond will drain longer than 24 hours and no more than 72 hours for that volume to meet the water quality requirement. Water Quality required volume begins at the Permanent Pool elevation and increases in stage until reaching the required water quality volume. 16 Wet Pond The proposed stormwater practice must incorporate forebays as applicable with the SWDSM. While not required to be shown during the conceptual plan submittals, this will have an effect on the configuration of the ponds as presented. As a result, please make sure the potential loss of storage is accounted for in the design. Department of Stormwater Management Page 5 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION The forebay shall be sized to contain 0.1 inch of runoff per impervious acre of contributing area. The forebay shall be a minimum of 2 feet deep with the top of the associated berm being no more than 0.5’ below the normal water level. The volume in the forebay counts towards the total water quality volume requirements of the BMP if it is above the normal water level. As an alternative, the forebay may be designed to meet a sediment trapping efficiency of 60 percent. 17 MTDs/ Wet Pond MTDs are being proposed within the R/W and for treatment of a residential project. Manufactured treatment devices (MTDs), often referred to as water quality devices (WQDs), are not recommended and are typically not approved for subdivisions due to the long-term maintenance concerns for HOAs. If the applicant would like to propose the use of MTDs, additional discussions with the City's Development Services and Legal departments will be required. 18 MTDs/ Wet Pond If approved for the site, manufactured treatment devices (MTDs) are not permitted in the right-of-way and are not to be maintained by the City. Location will need to be discussed with the City and the long-term operation and maintenance will need to be addressed in the Covenants for Permanent Maintenance of Stormwater Facilities agreement. Stormwater Memo - Maybank PUD Comments 1 Provide ICPR Model Files. 2 All Sheets/ Calculations Stormwater management design to adhere to 2025 Stormwater Design Manual. 3 All Sheets/ Calculations Please update Stormwater Management Device references throughout document/calculations to tie to 2025 Stormwater Design Manual BMPs. If utilizing Wet Pond, change to Wet Detention Pond. If utilizing Bioretention, change to Bioretention Basin. If utilizing Infiltration Basin, change to Infiltration Basin. Department of Stormwater Management Page 6 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 4 1 State the design follows the 2025 Stormwater Design Manual. 5 1 Include a description of how the conceptual design is consistent with the City’s adopted comprehensive plan (the Century V Plan) and the Johns Island Community Plan as relates to stormwater management and Low Impact Development (LID)/Green Infrastructure (GI) design elements. 6 2 D soils are being used in the CN calcs. Please add description of the dual HSG soils into the Narrative per City’s requirement to utilize the undrained soil type condition (i.e. for Type A/D soils, the Type D HSG classification is to be used in the hydrologic determinations) for new development and redevelopment projects. 7 2 Infiltration Rate: Refer to City Design Manual Technical Procedure Document #9, max infiltration rate is 3 in/hr after factor of safety incorporated unless design exception requested. Update narrative and calcs with infiltration rate to be utilized. 8 3 2.8.3 Site Planning The City requires the designer to consider the incorporation of low impact development (LID) or green infrastructure (GI) stormwater management techniques into the project to provide runoff reduction from the site along with enhanced water quality. Utilization of such practices may reduce the overall footprint of any proposed detention areas. Approaches to be considered are further detailed in section 2.8.3 of the SWDSM, and the resubmittal must specifically account for how each of these site planning and design elements (2.8.3.1 – 6) were addressed or considered. Only 5 of the 6 low impact development techniques are mentioned. Please include the category “Minimization of Impervious Cover”. In addition, add and describe Infiltration Basin, preservation of Wetlands Department of Stormwater Management Page 7 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION and natural drainage ways to appropriate categories. Also, update to change names of BMPs being utilized. 9 3 Special Protection Area: Update the narrative to detail the requirements per 2025 stormwater design manual and state project meeting or not meeting X% required reduction. 10 4-7 For all Tables, list % storm events with frequency storm events i.e. 2- year (50%) 11 4 Update Table 1.2, Percent Reduction Column numbers. Discrepancy with percent reduction numbers as numbers should be lower values. 12 4-5 Remove Tables 2.1-2.4 as the same 24-hour volume information is shown in Tables 3.1-3.2. 13 4- 6 Provide Table of POA-1 Pre & Post 2-yr, 10-yr, etc. storm events with Stages. 14 6-7 Tables 4.1-4.5: Update Stormwater BMP Name to tie to City Stormwater Manual BMP name. Add Bottom elevation, Permanent Pool elevation, Water Quality Volume elevation, and Top berm elevation to tables. 15 7 Water Quality Volume – Report mentions several different rainfall depths (0.5”, 1”, and 2.8”). Please remove/update narrative based upon stormwater management devices proposed and adherence to City requirements. 16 7 Describe and account for how water quality requirements will be addressed for rear lot drainage not routed through the proposed collection/conveyance and detention pond systems. The use of vegetated filter strip would be an acceptable approach; however those buffers will need to be accounted for in the concept plans relative to grading and vegetation (preserved and/or planted) as well as locating those buffers within common HOA parcels as opposed to individual lots. Department of Stormwater Management Page 8 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 17 8 List, address and fully describe any design exceptions to be requested in accordance with Chapter 4 of the SWDSM. 18 8 A discussion of issues relating to other State and Federal permits needed or regulations to be followed. 19 11 Soils map shows B soils within Project Area. Please account for in Pre and Post CN calculations. 20 Pre-/Post-Dev Drainage Maps 14-16 & 81-83 • Please provide TC flow paths on the Pre- and Post-Development Drainage Maps. • Provide Pre & Post Development Maps with Model Nodes and Links shown. Ensure Map and calculations naming conventions are consistent. • Pre & Post Development Drainage Area Maps & calculations need to account for Offsite DA from Fenwick Woods Residential HOA (Exist. Wet Pond, located adjacent Prop Pond #2) with apparent discharge to existing drainage ditch & eventually to POA 1. Also, need to evaluate offsite drainage along Southwick Drive to the west to determine drainage area that reaches POA 1. • Pre & Post Development Drainage Area Maps need to show all drainage area boundaries while still showing the Project Property Lines. Many of the drainage area boundaries are not shown for the Pre and a couple are not shown for the Post. Please add road labels and show existing contours with some contour labels enough to evaluate general basin boundaries. • Change Legend from Woods, Poor to Woods, Good as CN calcs use Woods Good Conditions of 77 for D soils. • It appears Existing Wetlands & Prop. Wet Ponds are calculating CN with 98 per City Design Manual Technical Procedure Document #6. Suggest add a separate column for Wetlands/Prop Department of Stormwater Management Page 9 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION Wet Ponds CN calculations and add a separate pattern to show in DA maps. • For 1% AEP Analysis per Section 3.9.4 and Technical Procedure Document #4, Offsite Undeveloped properties use Current Zoning, Offsite Developed properties use land use curve numbers. The Offsite Wood areas need to be changed to the Current Zoning. Update land use for recent project developments. Review and update CN. Review and update TC calcs based upon current land use/recent project developments. 21 15 & 82/83 Update & Review CN calcs. The “Total” Row is not adding all the basins areas. 22 16 3.4.5 Time of Concentration Shallow concentrated flow cannot exceed 1200 ft. 23 Post-Dev Drainage Maps 81-83 Post Development Drainage Area Map and CN calcs need to show and label all onsite drainage areas that bypass the stormwater management treatment devices. Ensure the bypass drainage areas are properly accounted for in the calculations and models. Some of the Rear of Lots are not draining to the Stormwater Management Devices. Most of the Onsite Woods shown will not be Woods, but wetlands, stormwater management device, and grass areas. 24 Pre- and Post- Dev CN Calcs 15 & 82 If end up using grass areas for CN in pre-development, please explain if using fair grass. Please explain poor grass use for post-development CN calculations. 25 TC Post Calcs If end up using values above min. TC of 6 min., please include TC for post-development. Department of Stormwater Management Page 10 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 26 47 & All The manning’s N value used for Existing & Proposed RCP pipe of 0.011 is not typically used. Higher values are typically used. Justification for this value will need to be provided. 27 55 & All Why are Proposed improvements shown/included in the Existing Conditions model? Pg 55 has information on Infiltration Pond 4, Bioretention. Existing conditions output pages has many examples of proposed information included. 28 172 (Wet Pond) Please check all Pond Outlet Control Structures updating orifice and weir sizes, elevations, and associated notes. Typical comment applicable to all 4 wet detention ponds: Pond #1 low flow orifice invert of 17’ coincides with bottom elevation of wet pond. Wet pond requires a permanent pool; therefore, low flow orifice with bottom of pond @ 17’ would need to be higher at approx. 20.5’ in order to provide the min. 3’ permanent pool depth and provide the 0.5% slope along bottom of pond. In addition, water quality volume stage/storage begins at the Permanent Pool elevation. 29 Infiltration Basins If utilizing Infiltration Basins, a low flow orifice would not be installed in the Outlet Control Structure as the intent is for the stormwater to infiltrate into the underlying soils. However, an overflow weir for larger storm events could be utilized. Update Calcs and models if/where utilizing an Infiltration Basin. 30 172 (Outlet Control Structure) Pond #1, with weir #2 bottom width of 25’, what is the size (Length x Width) of the Outlet Control Structure? This comment may be applicable to other Pond Outlet Control Structures. Please review all Pond Outlet Control Structures. 31 Input Report Please include the simulation manager ICPR input report into the stormwater memo for pre- and post-development scenarios. Department of Stormwater Management Page 11 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 32 Modeling Existing Wetlands Modeling Existing Wetlands: Refer to City Design Manual Technical Procedure Document #6. Individual wetlands must be modeled with a Curve Number of 98 unless documented. 33 Tailwater Please state which tailwater is used in the ICPR models i.e., static and dynamic and describe how starting elevation was determined. 34 1. Table of Contents Please provide a table of contents. 35 Exhibits Please provide a FEMA, USGS, Soils, and NWI exhibit and ensure the project area is shown on each exhibit. The FEMA FIRM reference and associated flood zone(s) must be updated to reflect the new Charleston County flood maps that became effective on 01/29/2021. 36 303d Please list the nearest SCDES Water Quality Monitoring Station (WQMS) that the site’s stormwater discharges drain to and the waterbody on which it is located (If nearest WQMS is listed on the latest 303(d)). 37 Disturbed Area Please include the total disturbed area in the stormwater memo. 38 Maintenance Please include a summary of the maintenance of the stormwater system and arrangements for post-construction maintenance responsibility. 39 3.4.6.2 Culverts Please include a section in the Stormwater Memo describing the proposed culvert crossing (E.0 to E.1) design and demonstrating how it meets the requirements of the referenced manual section. Provide sufficient design information to confirm that the crossing will not create adverse impacts to upstream conditions and that adequate roadway clearance is maintained. Department of Stormwater Management Page 12 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION A full culvert analysis is not required at this stage; however, the applicant should ensure the proposed culvert is planned in accordance with the 2025 City of Charleston Stormwater Design Standards Manual (SWDSM), Section 3.4.6.2. 40 3.9.3 Project Discharge The Drainage Memo states that “all on-site runoff for Maybank PUD will discharge directly to a right-of-way and will not impact any other private properties without permission from the site owners and the City of Charleston.” However, the plans show outfalls discharging to a private drainage easement and to private property (TMS No. 279-00-00-002). All designs must account for discharge rates and volumes to downstream and adjacent properties when easements or permissions are not in place. Unless post-development discharge rates and total volumes match pre-development conditions at these discharge points, a legal right of discharge or a properly recorded drainage easement is required. • Provide City of Charleston Drainage Easements for the ditch outfall, and provide documentation that the existing private drainage easement permits the proposed outfall in the design. • For the outfall to private property (TMS No. 279-00-00-002), ensure the design meets 2025 SWDSM requirements and does not increase total discharge volume, or obtain written permission from the property owner. 41 Easements Per Section 54-822(c) of the Zoning Code, easements, when required for drainage or sewage for the area to be subdivided, shall be of such width as necessary to permit proper construction of drainage facilities based on the drainage system of the area. No subdivision shall block or obstruct the natural drainage of an adjoining area. Existing natural drainage shall be maintained or replaced where possible or feasible. Department of Stormwater Management Page 13 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION Please address how this requirement is to be satisfied as part of the site design. Also include the identification of any off-site drainage easements needed for stormwater conveyance or storage. 42 USACE Provide a Unites States Army Corps of Engineers (USACE) Jurisdictional Determination and the accompanying wetland survey plat. Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 1 of 4 ENGG-PUD2026-000033_1st Review-Maybank PUD and Concept Plan Date: 12-Mar-2026 Project Name: Maybank PUD and Concept Plan To: Kimley-Horn and Associate, Inc. Project Type: PUD Master Plan and Concept Plan From: Moshtaba Vedad, Civil Engineer I Project TMS #: C279-00-00-010 vedadm@charleston-sc.gov or 843-619-6086 Project ID #: PUD2026-000033 Submittal Review #: 1st review – Comments Provided Documents Reviewed: Ref# Review # Document Title: Rev Ref# Review # Document Title: Rev SWDSM all City of Charleston Storm water Design Standards Manual, January 2020 Please provide a response to each review comment below (match text coloring to review for clarity) to show how the comment was addressed within your submittal. This will help provide a thorough project review and ensure proper communication between the reviewer and the applicant. With out responses to comments, subsequent submittals may not be reviewed. Resolution column is for City use only – A blank cell in this column indicates issue is still outstanding. Please return the completed Word document to the Engineering Division concurrently with your next TRC (re)submittal. # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 1. All PDF Files: Please provide functional PDF bookmarks with sheet/page numbers (and abbreviated sheet/chapter titles) to expedite review. Check function of ‘action’ prior to submitting. 2. Cover: Include City PUD ID # PUD2026-000033 on cover. Provide a description of all work being done at this stage. Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 2 of 4 ENGG-PUD2026-000033_1st Review-Maybank PUD and Concept Plan # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 3. Cover: Add the new 811 number with logo for the Palmetto Utility Protection Service (PUPS). Place Logo on any sheet(s) shows Excavation, Demolition, and any tree removal. 4. Site Plan – Lots: Although individual lots do not have to be shown, the types of lots/uses proposed should be provided (e.g., single-family, townhouse, multi-family, commercial, civic) 5. Site Plan: Open space, public use areas, amenity areas and recreational areas, identify location (Provide more detail on Open Space). For PUD projects, label Street Types 6. Site Plan – Streets: Show proposed street layout within the development including connections to existing streets and adjacent properties. Streets should be identified as public or private. Note R/W width and provide all right-of-way elements. Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 3 of 4 ENGG-PUD2026-000033_1st Review-Maybank PUD and Concept Plan # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 7. Existing Conditions / Survey: Provide a topographic survey of the existing conditions and a boundary survey or plat, both properly certified (signed and sealed) by a Land Surveyor registered in South Carolina responsible for the preparation of the survey. 8. Site Plan – Streets: Rights-of-way/Streets: show the locations, names, and ROW widths of all existing streets within 150 feet of the property boundary with ownership and maintenance (state, county, city, community, private etc.) noted. Show all proposed improvements to existing public roadways (i.e., widening existing streets for turn lanes, etc.). 9. Site Plan – Streets: Provide ROW Cross-Section or roadway typical to show roadway length and width, sidewalk width, Curb and gutter dimensions and concrete PSI being used. Show all types of HMA being used, indicate Yield (lb./sq. yd or inches compacted). 10. Site Plan: Provide a concept site “Master Plan” layout with principal dimensions. This must be prepared by a professional land. surveyor, Civil Engineer, or professional land planning consultant. 11. Site Plan: Pedestrian trails and bike paths: Show circulation within the Development if it will be in proposed design include connections to existing streets and adjacent properties. Identify whether items will be within or outside of proposed ROW areas. Note width of trails and bike paths. Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 4 of 4 ENGG-PUD2026-000033_1st Review-Maybank PUD and Concept Plan 12.. Grading and Drainage.: Provide a complete grading and drainage plan, labelling all drainage stormwater pipes and structures. Clearly illustrate intended direction of stormwater run-off on all surfaces. 13. Grading and Drainage: Provide all the information for any temporary Grading (cut and Fill) and drainage for this stage. Ensure all easements shown are consistent with the width requirements of the City’s Stormwater Design Standards Manual (SWDSM). 14. Utility Plan: Provide a complete Utility Plan, showing all existing and proposed connections to water, sewer, electric power, and gas, as applicable. Provide a conceptual Utility Plan, showing any existing utility easements, including any to be abandoned, or relocated. Show new utility easements for new transmission lines (water, sewer, gas and/or electricity). 15. PUD: Provide letter from St. John’s Water Co., Inc indicating public water and/or sewer capacity and availability for all the proposed new developments. Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 5 of 4 ENGG-PUD2026-000033_1st Review-Maybank PUD and Concept Plan 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 City of Charleston Department of Planning and Preservation William S. Cogswell, Jr., Mayor Robert Summerfield, Director TECHNICAL REVIEW COMMITTEE COMMENTS To: HLA, Inc. From: Ana Harp, Senior Zoning Planner harpa@charleston-sc.gov Date: March 12, 2026 Re: Maybank PUD Planned Unit Development – 1st Rev TMS#: 2790000006, 008, 009, 0017, 288, 3130000047, 237 City ID: PUD2026-000033 Comments: Yes Site Survey: 1. Show existing addresses. 2. Show Charleston city limits. Label each side with jurisdiction. 3. Include ownership and maintenance of rights-of-way. 4. Location and description of all existing easements. Land Use Plan: 1. Provide density and maximum number of lot allowed. 2. Show grand trees with species and size. Section 2 - Introduction 2.01 – Project Location 1. The table on Sec. 2.02 shows two parcels in Charleston County but the narrative states that one parcel is in Charleston County. Revise for consistency. 2. Have the parcels in the County received any readings at City Council? 3. The narrative states that the PUD is made up of eight parcels but the table in Sec. 2.02 only lists seven. Revise as needed. 2.03 – Background Information 1. The number of parcels is inconsistent again. Revise as needed. 2. Revise second sentence. 3. Is Southwick Drive being rerouted thru this proposed development? The plans continue to show Southwick Dr. in the existing location. Revise as needed. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 4. What commercial uses are being proposed to support a walkable, mixed-use community? 2.04 – Goals for the Project 1. Explain how the preschool will connect to the residential area. The plans do not appear to show any connection to the residential area. In fact, the plans do not seem to include the preschool parcel. Revise as needed. Sec. 3 – Land Use 3.03 – Development Pods 1. Clarify what regulations are to be followed in the Residential District. Sec. 4 – Zoning Criteria 4.01 – Commercial District (CD) 1. Correct typo – Commercial. 2. Consider replacing Disallowed with Prohibited. 3. Add “Adult Uses as described in the City of Charleston Zoning Ordinance. 4. Consider revising the minimum lot width for commercial district lots. 12’ seems too narrow for a commercial lot. 5. Setbacks: if the minimum setbacks are the same as the required buffer, does that mean that steps or HVAC equipment can encroach in the setbacks? Reminder that buffer may not allow for encroachments. 6. If parking will be required per City of Charleston Zoning Ordinance, add a note to that effect. 4.02 – Residential District (RD) 1. #7 – Change Certificate of Occupancy to Certificate of Construction Completion. 2. Same as above, consider replacing Disallowed with Prohibited. 3. Same as above, add Adult Uses as described in the City of Charleston Zoning Ordinance to disallowed/prohibited uses. 4. Revise note under Residential District – Dimensional Standards and correct as needed. Sec. 5 – Open Space 6.03 – Conceptual Plan for Open Space 1. How will the useable open space areas be activated? For each area designated for open space and recreational use, a list and description of the proposed improvements and facilities shall be provided with an explanation of the ownership and maintenance of the areas and facilities. Think beyond pedestrian trail and benches. 2. Will the amenity areas that include non-residential buildings require review and approval by the City’s Design Review Board (DRB)? Add to document if necessary. 3. Is the document suggesting that buffer areas will count as useable open space or just open space? . Sec. 7 – Right-of-Way 8.01 – Road Ownership 1. This section also indicates that Southwick Dr will be re-aligned but the plans do not show the realignment. Revise as needed. 2. Add a period after maintained, remove slash. 3. Indicate who will own and maintain all buffers. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Sec. 9 – Drainage Basin Analysis 9.01 – Flood Zone 1. Add community panel to information provided. Sec 12 – Letters of Coordination 1. Provide letters of coordination from Berkeley Electric Cooperative for gas. Sec 13 – Additional Development Criteria 13.01 – Signage 1. Be specific as the number of temporary signs and the length of period the signs are permitted. Do you have a type of signage that will not be permitted even as a temporary sign? Additional notes: 1. The plans included in the PUD document and the plans submitted for Concept Plan review are not the same as there is one parcel missing on all the Concept Plan sheets. 2. The properties to be annexed into the City must receive at least one reading at City Council prior to approval of PUD and Concept Plan. 3. PUD must be approved by Planning Commission and City Council after receiving TRC approval. 4. Additional comments may be provided upon review of future submittals and/or upon review of the project by the Zoning Administrator. Subdivision Concept Plan Submittal: *The plans submitted under th e PUD document and for Concept Plan review are different as the CP set does not include the County parcel 006. The plans must be the same. Revise as needed. Title Sheet 1. Title should read Subdivision Concept Plan. Revise as needed. 2. Current zoning should ind icate the existing zoning for all the parce ls, including the one(s) in the County. 3. Ensure revisions dates are included as applicable. Survey of Existing Conditions 1. No comments Layout Plan 1. Revise Title Block to include the name of this project. 2. Purpose Note: Should be the first note on plan describing subdivision’s purpose. This note should identify how the proposed project complies with the official City plans (e.g. City Plan, John Island Plan, Glenn McConnell Plan, etc). 3. Include TMS numbers and references to previously recorded plats and/or deeds. 4. On Site Summary, include the current zoning of all the parcels to be part of this project. 5. Land Use/Site Data Table - Provide the following information for the entire subdivision: gross acreage, net acreage, natural features acreage (e.g. wetland 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 acreage, critical area acreage, water body acreage, etc.), open space acreage including total, active and passive open space, per Zoning Ordinance requirements. Land use area acreage (e.g. commercial acres, mixed -use, single- family, multi-family, etc.), including % area per Zoning Ordinance requirements. Total maximum number of lots , including HOA lots and if the alley will be its own parcel. Total number of residential units for attached and detached single family residential. 6. Proposed new street names must be labeled on the plan and names must be reserved with City GIS & Charleston County. This can be done with Preliminary Plat. 7. The new street is labeled Cross Island Ext ension. I did not see any existing roads named Cross Island to extend with this project. Where did the name come? If a road is to be extended, call it Extension of Cross Island. 8. Label open space areas, public -use areas, amenity areas and recreational areas. More details can be provided in Open Space Plan. 9. Show Charleston city limits. 10. Show landscape buffers required per Zoning Ordinance , label buffer type and width. 11. Label easements as existing and proposed with description and width. 12. Do not show any buildings. The Concept Plan is for the approval of lots and rights - of-way. The Planning Commission does not approve building footprints; a Preliminary Plat and Road Construction Plans will be reviewed after Concept Plan is approved. Trails and Open Space 1. Provide open space acreage table. Note usable open space acreage, passive open space acreage, other HOA common areas, etc. HOA common areas that do not satisfy the definition of open space or usable open space per the City of Charleston Zoning Ordinance sh all not be counted as open space or usable open space (drainage ponds, ROW islands, leftover slivers of land, etc.) 2. A pedestrian path at least 5’ wide must be provid ed to connect parcel 006 with the proposed residential area. Ke ep in mind that the path must go somewher e and not end at the rear of a residential lot. 3. Pedestrian trails and bike paths: Show circulation within the development and proposed connections to existing streets and adjacent properties. Identify whether items will be within or outside of proposed ROW areas. Note width of trails and bike paths. 4. Identify the location, proposed use, proposed ownership and maintenance of all open space areas. Label/identify all open space areas by type/use. Grading and Drainage Plan 1. Refer to Engineering, Zoning and Stormwater comments. Utility Plan 1. Refer to Engineering, Zoning and Stormwater comments. Phase Plan 1. If applicable, phase lines shall be shown, and phases shall be numbered. Fire Protection Plan 1. Provide information as requested by the Fire Marshal. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Additional comments: 1. Add Land Use plan to Concept Plan documents. 2. Planning Commission must approve the Concept Plan prior to submitting for Preliminary Plat and Road Construction Plans. The plans presented to PC must be reviewed and approved by TRC at least two weeks prior to the PC monthly meeting to allow time to prov ide the approved plans to the Planning Commissioners in a timely manner.

Source: City of Charleston website. First collected Oct 23, 2026.