RecordWell Data

TRC Meeting Results 5-28-2026- 2nd Review Maybank PUD and Concept

City of Charleston · Berkeley County · meeting of Oct 21, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

City of Charleston Department of Parks Technical Review Committee Comments Submitted by: Rodney H. Porter, PLA porterr@charleston-sc.gov City of Charleston, Department of Parks, 823 Meeting Street, Charleston, SC 29403 843.637.9518 (m), 843.724.7322 (o) EREVIEW COMMENTS ______ COMMENTS ______ NO COMMENTS 1. There are no comments. PROJECT ID: PUD2026 -000033 AGENDA #: 1 PROJECT NAME: MAYBANK PUD AND CONCEPT PLAN DATE: 05/ 28 /202 6 ADDRESS: 3298 MAYBANK HWY REVIEW: 2ND REVIEW TMS #: C2790000010 REVIEW TYPE: PUD AND CONCEPT PLAN 5/26/2026 Page 1 of 1 Janet Schumacher, ADA Coordinator 50 Broad Street Charleston, SC 29401 (843) 577-1389 schumacherj@charleston-sc.gov City of Charleston Americans with Disabilities Act (ADA) Coordinator Comments for Technical Review Committee Maybank PUD City Project ID #PUD2026-000033 1. ADA Notes on page C2-15 repeat themselves & need editing. 2. Both streets are long & without crossings. With 4-foot-wide sidewalks (not enough room for wheelchairs to turn around) and rolled curb (not accessible) there needs to be an ADA compliant crossing or 2 on each street. Department of Stormwater Management Page 1 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 Date: 3/10/26 To: Kimley-Horn Andrew Todd-Burke Andrew.Todd-Burke@kimley-horn.com From: Ardurra Jason Sesler jsesler@ardurra.com cc: City of Charleston Bucci, Ron buccir@charleston-sc.gov Giralo, Anthony Giraloa@charleston-sc.gov Lewis, Alicia lewisa@charleston-sc.gov Project Name: Maybank PUD Project Type: PUD and Concept Plan Project ID #: PUD2026-000033 TMS #: 2790000017, -008, -009, -010, -288, 3130000047, -237 Submittal Review #: 1st Review – Comments provided *Comments provided for 1st Review Submittal on 2/23/2026. # SHEET / PAGE # COMMENT RESOLUTION 1 --- While some specific comments have been provided, a complete review cannot be performed until all required forms, documentation and design in conformance with the City of Charleston Stormwater Design Standards Manual (SWDSM) and TRC Procedure Manual are provided. 2 Construction Activity Application (CAA) Provide a completed, original Construction Activity Application (CAA) using the most current version provided in the City’s Stormwater Design Standards Manual (SWDSM). A fillable form version is available at https://www.charleston-sc.gov/351/Stormwater-Design-Standards-Manual. 3 CAA Provide stormwater plan review fee: $500.00 base fee plus $200.00 per disturbed acre rounded up to the next whole acre (up to $5,000.00 maximum fee). Please reach out to the Stormwater Administrator to generate an invoice for this fee. PUD Plan Set Comments 1 All Plan Sheets Please update labels of Stormwater Management Devices to tie into the 2025 Stormwater Design Manual BMPs. If utilizing Wet Pond, change label to Wet Detention Pond. If the design is utilizing Bioretention, Department of Stormwater Management Page 2 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION change label to Bioretention Basin. If utilizing Infiltration Basin, change label to Infiltration Basin. 2 Ensure Stormwater BMP designs adhere to City 2025 Stormwater Design Manual and Low Impact Development in Coastal South Carolina: A Planning and Design Guide. 3 Survey Sheet Survey sheets need to include survey of Project Area of Lot 6 & Lot 7 of Charleston Real Estate. 4 C3-00 (Grading and Drainage Plan) Per Section 3.9.3, All designs must also account for the discharge rates and volumes into the downstream and adjacent properties if proper easements and permissions are not in place. Unless the discharge rates and total volumes for the site’s discharge locations onto downstream and adjacent properties match the pre-development conditions, a legal right from that property owner or a proper drainage easement for any increase in runoff rates and volumes would be required. There are several locations where onsite rear of LOTS drainage is discharging offsite to adjacent properties and not draining to Stormwater Management Devices. Examples include LOTS 46-49, unclear if LOTS 50-53 drain to proposed Pond 1, LOTS 33-37, and LOTS 44-45. In addition Pond #4 outlet pipe discharges offsite onto an adjacent property, and the outlet pipe extends onto the adjacent offsite property. 5 Wet Pond Aquatic Bench: The proposed wet detention ponds must incorporate aquatic benches in accordance with section 3.10.3 of the SWDSM. This will have an effect on the configuration of the ponds as presented in the concept plan. Please revise the design to account for the contours associated with the aquatic benches. A minimum 10-foot-wide aquatic bench around the perimeter of the wet stormwater detention facility (with exception of the forebay area) with the inside edge of the shelf 6” Department of Stormwater Management Page 3 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION below the permanent pool level and the outside edge 6” above the permanent pool level with a resulting slope of 10H:1V. 6 Wet Pond The wet stormwater detention facility must incorporate several (minimum of three (3)) diverse native species of shallow water emergent and shall land herbaceous vegetation on the vegetated shelf. Landscaping meets requirements of the Wet Detention Practice Landscaping Criteria. 7 Wet Pond Bottom of all detention and retention ponds graded shall have a slope of not less than 0.5% towards the outlet structure(s) and side slopes no steeper than 3:1 unless adequately protected. 8 Wet Pond Total water balance and base flow conversion computed using Equation 4.11-1 and 4.11-2 or other approved methodology in Low Impact Development in Coastal South Carolina manual. 9 Wet Pond Documentation that the permanent pools will not draw down by more than 2' after a 30-day summer drought (see equations in Wet Detention Pond Design Criteria in Low Impact Development in Coastal South Carolina manual) 10 Wet Pond Geotechnical testing and analysis as necessary (see under table 4.11-1 in Low Impact Development in Coastal South Carolina manual). 11 Stormwater Management BMPs Geotechnical testing and analysis as required per City 2025 design manual and Low Impact Development in Coastal South Carolina manual). Infiltration rates, seasonal high water table, number of tests, etc. to be determined. Refer to Appendix B in LID in Coastal South Carolina manual and City Design Manual Sections 3.10.4, Section 6.9, Technical Procedure Document #9. Department of Stormwater Management Page 4 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 12 Wet Pond Permanent pool depth not to exceed 8' or be less than 3'. The 4 wet ponds as currently shown and modeled are not providing the required min. 3’ permanent pool depth. 13 Wet Pond/Detention Pond Per Section 3.16, An access easement with a width of 20 feet, minimum, shall be provided from the right-of-way to the pond. In addition, the entire pond and sufficient access room on the perimeter shall be included as part of the drainage easement that will include a minimum width of 20 feet outward from the top of the bank for the bench. The perimeter easement around the top of the bank of a pond shall have a maximum cross slope of 10H:1V. 14 WQv & Wet Pond Determine the rainfall depth to be used for WQv required based on Table 3-6 (tiered system, see equation 3-1). Note that WQv is based on the rainfall depth applied to the entire construction project area. Different tiers may be used for different portions of the site if different practices are used. Designer may manage more on one area than other to compensate for portions where they cannot obtain water quality volume. Wet Ponds (Detention) are Tier III = 2.8. 15 Wet Pond Ponds need to show the stage of the water quality volume based on the rainfall depth and show that the pond will drain longer than 24 hours and no more than 72 hours for that volume to meet the water quality requirement. Water Quality required volume begins at the Permanent Pool elevation and increases in stage until reaching the required water quality volume. 16 Wet Pond The proposed stormwater practice must incorporate forebays as applicable with the SWDSM. While not required to be shown during the conceptual plan submittals, this will have an effect on the configuration of the ponds as presented. As a result, please make sure the potential loss of storage is accounted for in the design. Department of Stormwater Management Page 5 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION The forebay shall be sized to contain 0.1 inch of runoff per impervious acre of contributing area. The forebay shall be a minimum of 2 feet deep with the top of the associated berm being no more than 0.5’ below the normal water level. The volume in the forebay counts towards the total water quality volume requirements of the BMP if it is above the normal water level. As an alternative, the forebay may be designed to meet a sediment trapping efficiency of 60 percent. 17 MTDs/ Wet Pond MTDs are being proposed within the R/W and for treatment of a residential project. Manufactured treatment devices (MTDs), often referred to as water quality devices (WQDs), are not recommended and are typically not approved for subdivisions due to the long-term maintenance concerns for HOAs. If the applicant would like to propose the use of MTDs, additional discussions with the City's Development Services and Legal departments will be required. 18 MTDs/ Wet Pond If approved for the site, manufactured treatment devices (MTDs) are not permitted in the right-of-way and are not to be maintained by the City. Location will need to be discussed with the City and the long-term operation and maintenance will need to be addressed in the Covenants for Permanent Maintenance of Stormwater Facilities agreement. Stormwater Memo - Maybank PUD Comments 1 Provide ICPR Model Files. 2 All Sheets/ Calculations Stormwater management design to adhere to 2025 Stormwater Design Manual. 3 All Sheets/ Calculations Please update Stormwater Management Device references throughout document/calculations to tie to 2025 Stormwater Design Manual BMPs. If utilizing Wet Pond, change to Wet Detention Pond. If utilizing Bioretention, change to Bioretention Basin. If utilizing Infiltration Basin, change to Infiltration Basin. Department of Stormwater Management Page 6 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 4 1 State the design follows the 2025 Stormwater Design Manual. 5 1 Include a description of how the conceptual design is consistent with the City’s adopted comprehensive plan (the Century V Plan) and the Johns Island Community Plan as relates to stormwater management and Low Impact Development (LID)/Green Infrastructure (GI) design elements. 6 2 D soils are being used in the CN calcs. Please add description of the dual HSG soils into the Narrative per City’s requirement to utilize the undrained soil type condition (i.e. for Type A/D soils, the Type D HSG classification is to be used in the hydrologic determinations) for new development and redevelopment projects. 7 2 Infiltration Rate: Refer to City Design Manual Technical Procedure Document #9, max infiltration rate is 3 in/hr after factor of safety incorporated unless design exception requested. Update narrative and calcs with infiltration rate to be utilized. 8 3 2.8.3 Site Planning The City requires the designer to consider the incorporation of low impact development (LID) or green infrastructure (GI) stormwater management techniques into the project to provide runoff reduction from the site along with enhanced water quality. Utilization of such practices may reduce the overall footprint of any proposed detention areas. Approaches to be considered are further detailed in section 2.8.3 of the SWDSM, and the resubmittal must specifically account for how each of these site planning and design elements (2.8.3.1 – 6) were addressed or considered. Only 5 of the 6 low impact development techniques are mentioned. Please include the category “Minimization of Impervious Cover”. In addition, add and describe Infiltration Basin, preservation of Wetlands Department of Stormwater Management Page 7 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION and natural drainage ways to appropriate categories. Also, update to change names of BMPs being utilized. 9 3 Special Protection Area: Update the narrative to detail the requirements per 2025 stormwater design manual and state project meeting or not meeting X% required reduction. 10 4-7 For all Tables, list % storm events with frequency storm events i.e. 2- year (50%) 11 4 Update Table 1.2, Percent Reduction Column numbers. Discrepancy with percent reduction numbers as numbers should be lower values. 12 4-5 Remove Tables 2.1-2.4 as the same 24-hour volume information is shown in Tables 3.1-3.2. 13 4- 6 Provide Table of POA-1 Pre & Post 2-yr, 10-yr, etc. storm events with Stages. 14 6-7 Tables 4.1-4.5: Update Stormwater BMP Name to tie to City Stormwater Manual BMP name. Add Bottom elevation, Permanent Pool elevation, Water Quality Volume elevation, and Top berm elevation to tables. 15 7 Water Quality Volume – Report mentions several different rainfall depths (0.5”, 1”, and 2.8”). Please remove/update narrative based upon stormwater management devices proposed and adherence to City requirements. 16 7 Describe and account for how water quality requirements will be addressed for rear lot drainage not routed through the proposed collection/conveyance and detention pond systems. The use of vegetated filter strip would be an acceptable approach; however those buffers will need to be accounted for in the concept plans relative to grading and vegetation (preserved and/or planted) as well as locating those buffers within common HOA parcels as opposed to individual lots. Department of Stormwater Management Page 8 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 17 8 List, address and fully describe any design exceptions to be requested in accordance with Chapter 4 of the SWDSM. 18 8 A discussion of issues relating to other State and Federal permits needed or regulations to be followed. 19 11 Soils map shows B soils within Project Area. Please account for in Pre and Post CN calculations. 20 Pre-/Post-Dev Drainage Maps 14-16 & 81-83 • Please provide TC flow paths on the Pre- and Post-Development Drainage Maps. • Provide Pre & Post Development Maps with Model Nodes and Links shown. Ensure Map and calculations naming conventions are consistent. • Pre & Post Development Drainage Area Maps & calculations need to account for Offsite DA from Fenwick Woods Residential HOA (Exist. Wet Pond, located adjacent Prop Pond #2) with apparent discharge to existing drainage ditch & eventually to POA 1. Also, need to evaluate offsite drainage along Southwick Drive to the west to determine drainage area that reaches POA 1. • Pre & Post Development Drainage Area Maps need to show all drainage area boundaries while still showing the Project Property Lines. Many of the drainage area boundaries are not shown for the Pre and a couple are not shown for the Post. Please add road labels and show existing contours with some contour labels enough to evaluate general basin boundaries. • Change Legend from Woods, Poor to Woods, Good as CN calcs use Woods Good Conditions of 77 for D soils. • It appears Existing Wetlands & Prop. Wet Ponds are calculating CN with 98 per City Design Manual Technical Procedure Document #6. Suggest add a separate column for Wetlands/Prop Department of Stormwater Management Page 9 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION Wet Ponds CN calculations and add a separate pattern to show in DA maps. • For 1% AEP Analysis per Section 3.9.4 and Technical Procedure Document #4, Offsite Undeveloped properties use Current Zoning, Offsite Developed properties use land use curve numbers. The Offsite Wood areas need to be changed to the Current Zoning. Update land use for recent project developments. Review and update CN. Review and update TC calcs based upon current land use/recent project developments. 21 15 & 82/83 Update & Review CN calcs. The “Total” Row is not adding all the basins areas. 22 16 3.4.5 Time of Concentration Shallow concentrated flow cannot exceed 1200 ft. 23 Post-Dev Drainage Maps 81-83 Post Development Drainage Area Map and CN calcs need to show and label all onsite drainage areas that bypass the stormwater management treatment devices. Ensure the bypass drainage areas are properly accounted for in the calculations and models. Some of the Rear of Lots are not draining to the Stormwater Management Devices. Most of the Onsite Woods shown will not be Woods, but wetlands, stormwater management device, and grass areas. 24 Pre- and Post- Dev CN Calcs 15 & 82 If end up using grass areas for CN in pre-development, please explain if using fair grass. Please explain poor grass use for post-development CN calculations. 25 TC Post Calcs If end up using values above min. TC of 6 min., please include TC for post-development. Department of Stormwater Management Page 10 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 26 47 & All The manning’s N value used for Existing & Proposed RCP pipe of 0.011 is not typically used. Higher values are typically used. Justification for this value will need to be provided. 27 55 & All Why are Proposed improvements shown/included in the Existing Conditions model? Pg 55 has information on Infiltration Pond 4, Bioretention. Existing conditions output pages has many examples of proposed information included. 28 172 (Wet Pond) Please check all Pond Outlet Control Structures updating orifice and weir sizes, elevations, and associated notes. Typical comment applicable to all 4 wet detention ponds: Pond #1 low flow orifice invert of 17’ coincides with bottom elevation of wet pond. Wet pond requires a permanent pool; therefore, low flow orifice with bottom of pond @ 17’ would need to be higher at approx. 20.5’ in order to provide the min. 3’ permanent pool depth and provide the 0.5% slope along bottom of pond. In addition, water quality volume stage/storage begins at the Permanent Pool elevation. 29 Infiltration Basins If utilizing Infiltration Basins, a low flow orifice would not be installed in the Outlet Control Structure as the intent is for the stormwater to infiltrate into the underlying soils. However, an overflow weir for larger storm events could be utilized. Update Calcs and models if/where utilizing an Infiltration Basin. 30 172 (Outlet Control Structure) Pond #1, with weir #2 bottom width of 25’, what is the size (Length x Width) of the Outlet Control Structure? This comment may be applicable to other Pond Outlet Control Structures. Please review all Pond Outlet Control Structures. 31 Input Report Please include the simulation manager ICPR input report into the stormwater memo for pre- and post-development scenarios. Department of Stormwater Management Page 11 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION 32 Modeling Existing Wetlands Modeling Existing Wetlands: Refer to City Design Manual Technical Procedure Document #6. Individual wetlands must be modeled with a Curve Number of 98 unless documented. 33 Tailwater Please state which tailwater is used in the ICPR models i.e., static and dynamic and describe how starting elevation was determined. 34 1. Table of Contents Please provide a table of contents. 35 Exhibits Please provide a FEMA, USGS, Soils, and NWI exhibit and ensure the project area is shown on each exhibit. The FEMA FIRM reference and associated flood zone(s) must be updated to reflect the new Charleston County flood maps that became effective on 01/29/2021. 36 303d Please list the nearest SCDES Water Quality Monitoring Station (WQMS) that the site’s stormwater discharges drain to and the waterbody on which it is located (If nearest WQMS is listed on the latest 303(d)). 37 Disturbed Area Please include the total disturbed area in the stormwater memo. 38 Maintenance Please include a summary of the maintenance of the stormwater system and arrangements for post-construction maintenance responsibility. 39 3.4.6.2 Culverts Please include a section in the Stormwater Memo describing the proposed culvert crossing (E.0 to E.1) design and demonstrating how it meets the requirements of the referenced manual section. Provide sufficient design information to confirm that the crossing will not create adverse impacts to upstream conditions and that adequate roadway clearance is maintained. Department of Stormwater Management Page 12 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION A full culvert analysis is not required at this stage; however, the applicant should ensure the proposed culvert is planned in accordance with the 2025 City of Charleston Stormwater Design Standards Manual (SWDSM), Section 3.4.6.2. 40 3.9.3 Project Discharge The Drainage Memo states that “all on-site runoff for Maybank PUD will discharge directly to a right-of-way and will not impact any other private properties without permission from the site owners and the City of Charleston.” However, the plans show outfalls discharging to a private drainage easement and to private property (TMS No. 279-00-00-002). All designs must account for discharge rates and volumes to downstream and adjacent properties when easements or permissions are not in place. Unless post-development discharge rates and total volumes match pre-development conditions at these discharge points, a legal right of discharge or a properly recorded drainage easement is required. • Provide City of Charleston Drainage Easements for the ditch outfall, and provide documentation that the existing private drainage easement permits the proposed outfall in the design. • For the outfall to private property (TMS No. 279-00-00-002), ensure the design meets 2025 SWDSM requirements and does not increase total discharge volume, or obtain written permission from the property owner. 41 Easements Per Section 54-822(c) of the Zoning Code, easements, when required for drainage or sewage for the area to be subdivided, shall be of such width as necessary to permit proper construction of drainage facilities based on the drainage system of the area. No subdivision shall block or obstruct the natural drainage of an adjoining area. Existing natural drainage shall be maintained or replaced where possible or feasible. Department of Stormwater Management Page 13 of 13 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION Please address how this requirement is to be satisfied as part of the site design. Also include the identification of any off-site drainage easements needed for stormwater conveyance or storage. 42 USACE Provide a Unites States Army Corps of Engineers (USACE) Jurisdictional Determination and the accompanying wetland survey plat. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 City of Charleston Department of Planning and Preservation William S. Cogswell, Jr., Mayor Robert Summerfield, Director TECHNICAL REVIEW COMMITTEE COMMENTS To: HLA, Inc. From: Ana Harp, Senior Zoning Planner harpa@charleston-sc.gov Date: May 28, 2026 Re: Maybank PUD Planned Unit Development – 2nd Rev TMS#: 2790000006, 008, 009, 0017, 288, 3130000047, 237 City ID: PUD2026-000033 Comments: Yes Title Sheet: 1. Correct City ID# to read PUD2026-000033. Site Survey: 1. Include width, ownership and maintenance of all rights-of-way on all plan sheets. Response indicates that it has been added to the plans but I’m not sure where it is. 2. Location and description of all existing easements. Land Use Plan: 1. Provide density and maximum number of lots allowed. Not found on Exhibit C as indicated in response. 2. Show grand trees with species and size. Add the trees shown on Existing Conditions to the Land Use Plan. Section 2 2.04 – Goals for the Project 1. Explain how the preschool will connect to the residential area. Sec. 3 – Land Use 3.03 – Development Pods 1. Clarify what regulations are to be followed in the Residential District. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Sec. 4 – Zoning Criteria 1.01 – Commercial District (CD) 1. Residential uses should not be permitted in the Commercial District as the PUD requires a mix of uses to include commercial. Maximum Residential Density is not required in the Commercial District since residential uses are not permitted. 1.02 – Residential District (RD) 1. Revise note under Residential District – Dimensional Standards. Consider revising to, “Accessory Structures must be placed behind the front façade of the principal structure” or something similar. The note as proposed is confusing. 2. On-street parking: Per Sec. 54-821, Table 8.1.f of the City of Charleston Zoning Ordinance: On-street parking and community parking lot requirements. Parking spaces shall be provided along local single-family residential access streets with one or more lots that are less than 9,000 square feet in high ground area. Parking spaces shall be provided on-street or in community parking lots constructed with the subdivision, or with a combination thereof. The number of parking spaces provided shall equal or exceed one (1) space for every four (4) lots, or fraction thereof, that are between than 6,000 square feet and 8,999 square feet in high ground, and (1) space for every three (3) lots, or fraction thereof, that are less than 6,000 square feet in high ground. Parking spaces shall be distributed throughout areas with lots that require on-street parking. Community parking lots shall comply with landscaping requirements in Article 3, Part 7, and include spaces that meet the minimum design requirements of section 54-318, except the lots may utilize a durable, pervious paving material with a concrete driveway that extends at least 10 feet beyond the right-of-way. Where on-street parking is provided, the minimum pavement width and minimum right-of-way width for local single-family residential access streets shall be increased, as described herein. On street parking spaces shall be a minimum of 22 feet in length and 7 feet wide, exclusive of curb and gutter. Where on-street parking is provided on one side of a street, street pavement width shall be increased to a minimum of 27 feet, exclusive of curb and gutter. Where on-street parking is provided on both sides, pavement width shall be a minimum of 34 feet, exclusive of curb and gutter, and right-of-way width shall be a minimum of 55 feet. Where parking is provided between driveways, the minimum driveway separation shall be 28 feet. The cross-sections must include on-street parking. Revise as needed. Sec. 5 – Open Space 1.03 – Conceptual Plan for Open Space 1. How will the useable open space areas be activated? For each area designated for open space and recreational use, a list and description of the proposed improvements and facilities shall be provided with an explanation of the ownership and maintenance of the areas and facilities. Think beyond pedestrian trail and benches. List the uses that may be included as part of the usable open space. 2. Based on the Open Space exhibit, provide the acreage of Open Space and usable Open Space provided to ensure the requirement is being met. Sec. 9 – Drainage Basin Analysis 9.01 – Flood Zone 1. Add community panel to information provided. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Sec 13 – Additional Development Criteria 13.01 – Signage 1. Clarify which signs will require DRB approval. In one sentence it states that all signs will require DRB approval and in the third paragraph it states that directional signage does not require DRB approval. I think I understand what you are trying to say, it needs to be clear. 2. Temporary signs: correct typos – Zoning, Section. Additional notes: 1. On Road Cross Section Type C, what does 7.5’ represent? Is it a path or sidewalk? Label as needed. 2. PUD must be approved by Planning Commission and City Council after receiving TRC approval. 3. Additional comments may be provided upon review of future submittals and/or upon review of the project by the Zoning Administrator. Subdivision Concept Plan Submittal: *The plans submitted under the PUD document and for Concept Plan review are different as the CP set does not include the County parcel 006 . The plans must be the same and parcel 006 must be included on all sheets . Revise as needed. Layout Plan 1. Revise Title Block to include the name of this project. 2. Purpose Note: Add the purpose note shown on the cover sheet to the La yout Plan. 3. Include references to previously recorded plats and/or deeds. 4. Land Use/Site Data Table - Provide the following information for the entire subdivision: Land use area acreage (e.g. commercial acres, mixed -use, single- family, multi-family, etc.), including % area per Zoning Ordinance requirements. Total maximum number of lots , including HOA lots and if the alley will be its own parcel. Total number of residential units for attached and detached single family residential . 5. Label easements as existing and proposed with description and width. 6. For Concept Plan, show lots only. Do not include setbacks or buildable area as it might be confused with building footprints. 7. Move cross-sections to a separate sheet. Reminder that on -street parking is required and must be shown on the cross-sections. Trails and Open Space 1. What does the green line across the two pocket parks , plan southwest, represent? Grading and Drainage Plan 1. Refer to Engineering, Zoning and Stormwater comments. Utility Plan 1. Refer to Engineering, Zoning and Stormwater comments. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Phase Plan 1. If applicable, phase lines shall be shown, and phases shall be numbered. Fire Protection Plan 1. Provide information as requested by the Fire Marshal. Additional comments: 1. Planning Commission must approve the Concept Plan prior to submitting for Preliminary Plat and Road Construction Plans. The plans presented to PC must be reviewed and approved by TRC at least two weeks prior to the PC monthly meeting to allow time to prov ide the approved plans to the Planning Commissioners in a timely manner. Approval Conditional Approval Comments Agenda Item #_01_ 1 CITY OF CHARLESTON DEPARTMENT OF TRAFFIC & TRANSPORTATION TRC REQUIREMENTS TRANSPORTATION PROJECT MANAGEMENT DIVISION (843) 724-7372 WallaceJ@charleston-sc.gov SITE: Maybank PUD and Concept Plan DATE: 5/28/2026 TMS #: 279-00-00-010 PLEASE NOTE: Final approval is contingent upon implementation of comments. 2nd Review Comments: TRC-PUD2026-000033 1. Show the proposed restriped EB left turn lane on Maybank Hwy. at Site Driveway #1 on the site plan. 2. Lane striping on the site plan (left turn lane and through/right) does not match the recommended TIS lane striping (right turn lane and through/left). 3. Request from Mayor at T&T Committee – Create an easy to understand aerial/concept plan showing the final configuration of the signal, roadway network, and Heritage driveway. TECHNICAL REVIEW COMMITTEE Zoning Division Comments May 28, 2026 Prepared by: Eric Schultz, # 843.724.3790 or Schultze@charleston-sc.gov Maybank PUD and Concept Plan. TMS # 279-00-00-010. General Zoning: 1. The team is to verify if the Johns Island Greenway Plan envisioned a multi-use path on the parcels/in the vicinity? -- John Lambert, Mobility Planner, shall be consulted. 2. Please verify that the ‘four-way’ intersection aligns with the latest Heritage Capital /Mungo Homes Tract street alignment. Exhibits. Road Layout: 3. Verify whether emergency access is necessary to access the alley via the buffer. 4. Are the hatched lines in the buffer indicating an E-access? If so, label it and provide a typical detail. Street Cross Sections: 5. Consider 11’ travel lanes and 5’ tree lawns for the 50’ right-of-way. Buffer Exhibit: 6. Provide a note that existing trees in the buffer zone shall be preserved if not in conflict with an approved improvement. 7. Specify a 10 ’ minimum multi -use path adjacent to Maybank Hwy – may meander in the buffer. 8. What is meant by ‘events’ in the back third of the buffer? 9. Clearly state that SW facilities are permitted in the back third (25’ zone) of the buffer and will be supplemented with appropriate plant material. WILLIAM S. COGSWELL, JR City of Charleston ROBERT SUMMERFIELD MAYOR MAYOR DIRECTOR Department of Planning, Preservation and Sustainability 2 G E O R G E S T R E E T • C H A R L E S T O N , S O U T H C A R O L I N A • 2 9 4 0 1- 3506 P H O N E : ( 8 4 3 ) 7 2 4 - 3 7 6 5 • F A X : ( 8 4 3 ) 7 2 4- 3772 Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 1 of 4 ENGG-PUD2026-000033_2nd Review-Maybank PUD and Concept Plan Date: To: 12-Mar-2026, 04-Jun-2026 Kimley-Horn and Associate, Inc. Project Name: Project Type: Maybank PUD and Concept Plan PUD Master Plan and Concept Plan From: Moshtaba Vedad, Civil Engineer I vedadm@charleston-sc.gov or 843-619-6086 Project TMS: Project ID #: C279-00-00-010 PUD2026-000033 Submittal Review #: 1st review – Comments Provided 2nd Review-Paperwork Documents Reviewed: Ref# Review # Document Title: Rev Ref# Review # Document Title: Rev SWDSM all City of Charleston Storm water Design Standards Manual, January 2020 Please provide a response to each review comment below (match text coloring to review for clarity) to show how the comment was addressed within your submittal. This will help provide a thorough project review and ensure proper communication between the reviewer and the applicant. With out responses to comments, subsequent submittals may not be reviewed. Resolution column is for City use only – A blank cell in this column indicates issue is still outstanding. Please return the completed Word document to the Engineering Division concurrently with your next TRC (re)submittal. # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 1. All PDF Files: Please provide functional PDF bookmarks with sheet/page numbers (and abbreviated sheet/chapter titles) to expedite review. Check function of ‘action’ prior to submitting. Functional PDF bookmarks with sheet/page numbers is provided. Resolved 2. Cover: Include City PUD ID # PUD2026-000033 on cover. Provide a description of all work being done at this stage. PUD review case # with a description of work to be completed is included on cover sheet. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 2 of 4 ENGG-PUD2026-000033_2nd Review-Maybank PUD and Concept Plan # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 3. Cover: Add the new 811 number with logo for the Palmetto Utility Protection Service (PUPS). Place Logo on any sheet(s) shows Excavation, Demolition, and any tree removal. New 811 number with logo has been included on all sheets. Resolved 4. Site Plan – Lots: Although individual lots do not have to be shown, the types of lots/uses proposed should be provided (e.g., single-family, townhouse, multi-family, commercial, civic) All lots are proposed to be single-family. Additional information is provided on the site development summary within the land use section of sheet C2-00. Resolved 5. Site Plan: Open space, public use areas, amenity areas and recreational areas, identify location (Provide more detail on Open Space). For PUD projects, label Street Types Requested information included within the Site Plan and Open space Plan. Resolved 6. Site Plan – Streets: Show proposed street layout within the development including connections to existing streets and adjacent properties. Streets should be identified as public or private. Note R/W width and provide all right-of-way elements. Street layout is provided. Additional information to note R/W widths and maintenance responsibilities is included on the Site Plan. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 3 of 4 ENGG-PUD2026-000033_2nd Review-Maybank PUD and Concept Plan # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 7. Existing Conditions / Survey: Provide a topographic survey of the existing conditions and a boundary survey or plat, both properly certified (signed and sealed) by a Land Surveyor registered in South Carolina responsible for the preparation of the survey. All Surveyed sheets must be signed and sealed by a surveyor registered in South Carolina responsible for the preparation of the survey. Surveyor is obtaining additional information as it relates to other comments within this concept review and was not able to return prior to resubmittal. A signed and sealed certified copy of the survey will be provided prior to Concept Approval. Paperwork 8. Site Plan – Streets: Rights-of-way/Streets: show the locations, names, and ROW widths of all existing streets within 150 feet of the property boundary with ownership and maintenance (state, county, city, community, private etc.) noted. Show all proposed improvements to existing public roadways (i.e., widening existing streets for turn lanes, etc.). All proposed improvements are being shown within row. Names of streets will be reserved at time of preliminary plat. All existing streets and maintenance responsibilities are provided. Resolved 9. Site Plan – Streets: Provide ROW Cross-Section or roadway typical to show roadway length and width, sidewalk width, Curb and gutter dimensions and concrete PSI being used. Show all types of HMA being used, indicate Yield (lb./sq. yd or inches compacted). No typical are shown in plan sheet C2-00 Multiple typical sections are being proposed as part of this PUD. All typical sections are provided on sheet C2-00. Additional notes for HMA, curb and gutter, concrete sidewalk, etc. are provided within the Road Notes. Paperwork 10. Site Plan: Provide a concept site “Master Plan” layout with principal dimensions. This must be prepared by a professional land. surveyor, Civil Engineer, or professional land planning consultant. Noted. Resolved 11. Site Plan: Pedestrian trails and bike paths: Show circulation within the Development if it will be in proposed design include connections to existing streets and adjacent properties. Identify whether items will be within or outside of proposed ROW areas. Note width of trails and bike paths. Pedestrian trails and bike paths are provided. See open space plan. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 4 of 4 ENGG-PUD2026-000033_2nd Review-Maybank PUD and Concept Plan 12.. Grading and Drainage.: Provide a complete grading and drainage plan, labelling all drainage stormwater pipes and structures. Clearly illustrate intended direction of stormwater run-off on all surfaces. Complete grading and drainage plan with drainage intent clearly illustrated is provided. Resolved 13. Grading and Drainage: Provide all the information for any temporary Grading (cut and Fill) and drainage for this stage. Ensure all easements shown are consistent with the width requirements of the City’s Stormwater Design Standards Manual (SWDSM). Cut and fill provided on grading plan. All easements shown are consistent with City design standards manual. Resolved 14. Utility Plan: Provide a complete Utility Plan, showing all existing and proposed connections to water, sewer, electric power, and gas, as applicable. Provide a conceptual Utility Plan, showing any existing utility easements, including any to be abandoned, or relocated. Show new utility easements for new transmission lines (water, sewer, gas and/or electricity). Complete Utility Plan is provided. Electric power, gas, etc. shall be coordinated by owner within the ROW or GUE as needed during preliminary plat plan review process. Resolved 15. PUD: Provide letter from St. John’s Water Co., Inc indicating public water and/or sewer capacity and availability for all the proposed new developments. Letter from St. Johns Water Co is provided. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 5 of 4 ENGG-PUD2026-000033_2nd Review-Maybank PUD and Concept Plan CHARLESTON FIRE DEPARTMENT Fire Marshal Division Permit Application & Plan Review Comments 2 GEORGE ST, CHARLESTON, SOUTH CAROLINA 29401 • PHONE (843) 724-3429• FAX (843) 720-5857 Version: 06/06/2018 Project Project Status Name: Maybank PUD concept plan Status: Hold - see comments Address: 3298 Maybank Hwy Received: May 18, 2026 Type: Site Plan Review Reviewed: May 27, 2026 Submittal: Revised submittal review Revised plans required: Yes Permit #: PUD2026-000033 Written response required: Yes Project Contact Fire Plans Reviewer Name: Andrew Todd-Burke Name: Rick Fluegge Company: Kimley-Horn and Associates Title: Deputy Fire Marshal Phone: Phone: (843)724-5893 Applicant’s Email: Andrew.todd-burke@kimley-horn.com Reviewer’s Email: fluegger@charleston-sc.gov Thank you for your recent submittal. We look forward to working with you throughout this project in order to ensure the safety of our citizens and our emergency responders. Please submit a written response to the following comments and annotate these corrections on the revised drawings. Response letters must list explanations in the same order as the comments appear on this review letter. Permits will not be issued until all items have been reviewed and work shall not commence until the issuance of the permit. Please be sure to address all items on the review in order to expedite the review process. General: 1. Provide the construction type (SCBC), total square footage, stories above and below grade. 2. Provide the available fire flow at the site, measured at 20 PSI residual pressure, available for firefighting. 3. Indicate the required fire flow in accordance with an acceptable calculation method. Basic guidance may be found in Appendix B of the SCFC. Flow rate reductions must be submitted for review and approval. 4. The required water supply for fire protection must be made available prior to combustible construction material arrival at the site as required by SCFC 3313.1. 5. In the event the required fire department vehicle access roads is only 20’ in width, provide “No on street parking” signs or an equivalent. 6. All residential dwellings associated supporting building systems (e.g. electrical services, fire -pump, fire-alarm, HVAC units and ductwork, hot water heaters, etc.), and residential ancillary spaces within mixed -use commercial buildings are prohibited below DFE and are not permitted to be dry floodproofed. Refer to FEMA Technical Bulletin 3. For additional information, please contact Caroline Schnell, City of Charleston Floodplain Management Manager. She can be reached at (843) 579-6481 or via e-mail at schnellc@charleston- sc.gov. 7. Please coordinate with City GIS regarding the address for the property. Street address shall be posted in not less than 4-inch letters/numbers (recommend 6 inch) in a manner that is plainly visible from the street or road fronting the property as required by SCFC section 505.1. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Individual suites or subdivision within the building shall include the suite designation in a 4-inch minimum letter/number. Street marquees shall include the site address. Plan review by this office does not include a check of every item and does not relieve the owner, contractor, or designer of meeting all code requirements. Issuance of a permit shall not be construed as authority to violate local, State, or Federal rules or regulations. Work commencing prior to permitting may result in double permit fees and/or fines.

Source: City of Charleston website. First collected Oct 23, 2026.