RecordWell Data

TRC Meeting Results 8-6-2026- 3rd Review Maybank PUD

City of Charleston · Berkeley County · meeting of Oct 21, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CHARLESTON FIRE DEPARTMENT Fire Marshal Division Permit Application & Plan Review Comments 2 GEORGE ST, CHARLESTON, SOUTH CAROLINA 29401 • PHONE (843) 724-3429• FAX (843) 720-5857 Version: 06/06/2018 Project Project Status Name: Maybank PUD concept plan Status: Approved w/comments Address: 3298 Maybank Hwy Received: July 27, 2026 Type: Site Plan Review Reviewed: August 5, 2026 Submittal: Revised submittal review Revised plans required: No Permit #: PUD2026-000033 Written response required: No Project Contact Fire Plans Reviewer Name: Andrew Todd-Burke Name: Rick Fluegge Company: Kimley-Horn and Associates Title: Deputy Fire Marshal Phone: Phone: (843)724-5893 Applicant’s Email: Andrew.todd-burke@kimley-horn.com Reviewer’s Email: fluegger@charleston-sc.gov Thank you for your recent submittal. We look forward to working with you throughout this project in order to ensure the safety of our citizens and our emergency responders. The following items will need to be addressed as part to the TRC review process. General: 1. Provide the construction type (SCBC), total square footage, stories above and below grade. 2. Provide the available fire flow at the site, measured at 20 PSI residual pressure, available for firefighting. 3. Indicate the required fire flow in accordance with an acceptable calculation method. Basic guidance may be found in Appendix B of the SCFC. Flow rate reductions must be submitted for review and approval. 4. The required water supply for fire protection must be made available prior to combustible construction material arrival at the site as required by SCFC 3313.1. 5. In the event the required fire department vehicle access roads is only 20’ in width, provide “No on street parking” signs or an equivalent. 6. All residential dwellings associated supporting building systems (e.g. electrical services, fire-pump, fire-alarm, HVAC units and ductwork, hot water heaters, etc.), and residential ancillary spaces within mixed -use commercial buildings are prohibited below DFE and are not permitted to be dry floodproo fed. Refer to FEMA Technical Bulletin 3. For additional information, please contact Caroline Schnell, City of Charleston Floodplain Management Manager. She can be reached at (843) 579-6481 or via e-mail at schnellc@charleston- sc.gov. 7. Please coordinate with City GIS regarding the address for the property. Street address shall be posted in not less than 4-inch letters/numbers (recommend 6 inch) in a manner that is plainly visible from the street or road fronting the property as required by SCFC section 505.1. Address numbers shall be Arabic numbers or alphabetical letters. Numbers shall not be spelled out. Individual suites or subdivision within the building shall include the suite designation in a 4-inch minimum letter/number. Street marquees shall include the site address. Plan review by this office does not include a check of every item and does not relieve the owner, contractor, or designer of meeting all code requirements. Issuance of a permit shall not be construed as authority to violate local, State, or Federal rules or regulations. Work commencing prior to permitting may result in double permit fees and/or fines. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 City of Charleston Department of Planning and Preservation William S. Cogswell, Jr., Mayor Robert Summerfield, Director TECHNICAL REVIEW COMMITTEE COMMENTS To: HLA, Inc. From: Ana Harp, Senior Zoning Planner harpa@charleston-sc.gov Date: August 6, 2026 Re: Maybank PUD Planned Unit Development – 3rd Rev TMS#: 2790000006, 008, 009, 0017, 288, 3130000047, 237 City ID: PUD2026-000033 Comments: Yes Title Sheet: 1. Correct City ID# to read PUD2026-000033. Site Survey/Existing Conditions: 1. Include width, ownership and maintenance of all rights-of-way on all plan sheets. Response indicates that it has been added to the plans but I’m not sure where it is. 2. The legend includes grades for grand tree but none of the trees on the plan have the corresponding grades. Revise as needed. . Land Use Plan: 1. Show grand trees with species and size. Add the trees shown on Existing Conditions to the Land Use Plan. Not shown as indicated on response to this comment. The trees should be shown on all sheets of the PUD. Sec. 4 – Zoning Criteria 1.01 – Commercial District (CD) 1. On dimensional standards table, change Charleston County Stormwater Manual to City of Charleston Stormwater Manual as the Charleston County standards do not apply. 1.02 – Residential District (RD) 1. Add a note that on-street parking will be provided as required in the Zoning Ordinance. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Sec. 5 – Open Space 1.03 – Conceptual Plan for Open Space 1. Based on the Open Space exhibit, provide the acreage of Open Space and usable Open Space required and provided to ensure the requirement is being met. Sec. 8 – Right-of-Way 8.03 – Sidewalks 1. Include verbiage that speaks to the “Johns Island Greenway” requirement for providing sidewalks. State that the alignment shall be discussed with City staff (Planning, T&T, Parks) at a later time. Keep in mind that a wider sidewalk is not what is envisioned and it must be off the rights-of-way. Additional notes: 1. PUD must be approved by Planning Commission and City Council after receiving TRC approval. 2. Additional comments may be provided upon review of future submittals and/or upon review of the project by the Zoning Administrator. Subdivision Concept Plan Submittal: *The plans submitted under the PUD document and for Concept Plan review are different as the CP set does not include the County parcel 006 . The plans must be the same and parcel 006 must be included on all sheets . Revise as needed. Layout Plan 1. Revise Title Block to include the name of this project. 2. Purpose Note: Add the purpose note shown on the cover sheet and on the Layout Plan. 3. Land Use/Site Data Table - Provide the following information for the entire subdivision: Land use area acreage (e.g. commercial acres, mixed -use, single- family, multi-family, etc.), including % area per Zoning Ordinance requirements. Total maximum number of lots , including HOA lots and if the alley will be its own parcel. Total number of residential units for attached and detached single family residential . 4. Label easements as existing and proposed with description and width. 5. Include the green line across the two pocket parks, plan southwest on the Open Space plan, on the site plan legend 6. For Concept Plan, show lots only. Do not include setbacks as they may be confused with building footprints. 7. Move cross-sections to a separate sheet. Reminder that on -street parking is required and must be shown on the cross -sections. Trails and Open Space 1. Include the green line across the two pocket parks, plan southwest , on the stie plan legend Grading and Drainage Plan 1. Refer to Engineering, Zoning and Stormwater comments. Utility Plan 1. Refer to Engineering, Zoning and Stormwater comments. 2 George Street · 3RD Floor · Charleston, South Carolina 29401 · Tel. (843) 724-3765 Fire Protection Plan 1. Provide information as requested by the Fire Marshal. Additional comments: 1. Planning Commission must approve the Concept Plan prior to submitting for Preliminary Plat and Road Construction Plans. The plans presented to PC must be reviewed and approved by TRC at least two weeks prior to the PC monthly meeting to allow time to prov ide the approved plans to the Planning Commissioners in a timely manner. WILLIAM S. COGSWELL, JR. City of Charleston ROBERT SUMMERFIELD MAYOR DIRECTOR Department of Planning, Preservation and Sustainability TECHNICAL REVIEW COMMITTEE Zoning Division Comments August 6, 2026 Prepared by: Eric Schultz, #843.724.3790 or Schultze@charleston-sc.gov Agenda Item #11 – Maybank Hwy/Fern Hill Dr., Maybank Hwy. PUD. TMS #279-00-00-008. Paperwork Only. Section 5. 1.) Please make a reference to the project providing & building a segment of the Johns Island Greenway Plan. Note that the applicant will consult wi th the city ’s Mobility Planner as the greenway may traverse through the HOA lots with a public access easement during the plat and road construction plan review process. 2.) Path should be a minimum of 8’ wide, may need to modify the ‘east/west’ street cross -section. 7 2 G E O R G E S T R E E T • C H A R L E S T O N , S O U T H C A R O L I N A • 2 9 4 0 1- 3 5 0 6 T H E S I T E P L A N M U S T R E F L E C T T H E P L A N A P P R O V E D B Y T H E B Z A - S D P H O N E : ( 8 4 3 ) 7 2 4 - 3 7 6 5 • F A X : ( 8 4 3 ) 7 2 4 - 3 7 7 2 Department of Stormwater Management Page 1 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 Date: 8/5/26 To: Kimley-Horn Andrew Todd-Burke Andrew.Todd-Burke@kimley-horn.com From: Ardurra Jason Sesler jsesler@ardurra.com cc: City of Charleston Bucci, Ron buccir@charleston-sc.gov Yazgan, Yesim Yazgany@charleston-sc.gov Lewis, Alicia lewisa@charleston-sc.gov Project Name: Maybank PUD Project Type: PUD and Concept Plan Project ID #: PUD2026-000033 TMS #: 2790000017, -008, -009, -010, -288, 3130000047, -237 Submittal Review #: 3rd Review – Comments provided *Comments provided for 1st Review Submittal (1) on 3/10/2026 for TRC meeting on 3/12/2026. ** Comments provided for 2nd Review Submittal (2) on 5/26/2026 for TRC meeting on 5/28/2026. *** Comments provided for 3rd Review Submittal (3) on 8/5/2026 for TRC meeting on 8/6/2026. # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 1 --- (1) While some specific comments have been provided, a complete review cannot be performed until all required forms, documentation and design in conformance with the City of Charleston Stormwater Design Standards Manual (SWDSM) and TRC Procedure Manual are provided. (1) Stormwater documentation has been revised and resubmitted. A comprehensive Stormwater Memo has been provided that includes updated hydrologic and hydraulic modeling, ICPR input/output files, revised drainage areas, updated curve number calculations, and supporting exhibits prepared in accordance with the 2025 City of Charleston Stormwater Design Standards Manual. (2)Acknowledged. No further action for PUD process. Specific comments will be added when appropriate. 2 Construction Activity Application (CAA) (1) Provide a completed, original Construction Activity Application (CAA) using the most current version provided in the City’s Stormwater Design Standards Manual (SWDSM). A fillable form version is available at https://www.charleston- sc.gov/351/Stormwater-Design-Standards-Manual. (1) A completed Construction Activity Application (CAA) will be submitted under separate cover using the current City of Charleston form prior to construction plan approval. (2) Acknowledged. No further action for PUD process. Department of Stormwater Management Page 2 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 3 CAA (1) Provide stormwater plan review fee: $500.00 base fee plus $200.00 per disturbed acre rounded up to the next whole acre (up to $5,000.00 maximum fee). Please reach out to the Stormwater Administrator to generate an invoice for this fee. (1) The required stormwater plan review fee will be coordinated with the City of Charleston Stormwater Administrator based on the final disturbed acreage identified in the revised Stormwater Memo. (2) Provide receipt upon payment. (3) Still outstanding. The Stormwater Review Fee is different from the TRC review fee. PUD Plan Set Comments 1 All Plan Sheets (1) Please update labels of Stormwater Management Devices to tie into the 2025 Stormwater Design Manual BMPs. If utilizing Wet Pond, change label to Wet Detention Pond. If the design is utilizing Bioretention, change label to Bioretention Basin. If utilizing Infiltration Basin, change label to Infiltration Basin. (1) Stormwater Management Device labels have been updated throughout the plan set and stormwater memo to align with the 2025 City of Charleston Stormwater Design Standards Manual. (2) Complied. 2 (1) Ensure Stormwater BMP designs adhere to City 2025 Stormwater Design Manual and Low Impact Development in Coastal South Carolina: A Planning and Design Guide. (1) All proposed stormwater BMPs have been designed in accordance with the 2025 City of Charleston Stormwater Design Standards Manual and the Low Impact Development in Coastal South Carolina: A Planning and Design Guide. (2) Complied. 3 Survey Sheet (1) Survey sheets need to include survey of Project Area of Lot 6 & Lot 7 of Charleston Real Estate. (1) Survey coverage has been expanded to include the full Project Area for Lot 6 and Lot 7 and is reflected on the updated survey sheets. A signed and sealed survey will be provided prior to plan approval. (2) Acknowledged. (3) Comment still open. 4 C3-00 (Grading and Drainage Plan) (1) Per Section 3.9.3, All designs must also account for the discharge rates and volumes into the downstream and adjacent properties if proper easements and permissions are not in place. Unless the discharge rates and total volumes for the site’s discharge locations onto downstream and adjacent (1) Site grading and drainage have been revised to address rear-lot and offsite drainage conditions. Runoff is routed to proposed stormwater management BMPs where feasible, and discharge locations have been evaluated to confirm no Department of Stormwater Management Page 3 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE properties match the pre-development conditions, a legal right from that property owner or a proper drainage easement for any increase in runoff rates and volumes would be required. There are several locations where onsite rear of LOTS drainage is discharging offsite to adjacent properties and not draining to Stormwater Management Devices. Examples include LOTS 46-49, unclear if LOTS 50-53 drain to proposed Pond 1, LOTS 33-37, and LOTS 44-45. In addition, Pond #4 outlet pipe discharges offsite onto an adjacent property, and the outlet pipe extends onto the adjacent offsite property. increase in offsite discharge rates or volumes. Refer to the revised Stormwater Memo and drainage exhibits. (2) There are 2 design aspects related to the areas that don’t drain to the stormwater management devices (1. Release onto offsite properties, and 2. Providing stormwater management for areas that don’t drain to infiltration basins.) Please respond to specific lots mentioned in this review comment. Lots 46-50 are discharging offsite to Alexander Nosov property, and rates & volumes are assumed to be increasing onto the Nosov property. Please review Lots 33-37 & Lots 44- 45. Calculations will be required to confirm post conditions are not increasing from pre conditions. Refer to original review comment for complete requirements. How is stormwater management being provided for the lots/areas not draining to the proposed infiltration basins? As an example, how is stormwater management being provided for Lots 46-50? Please also refer to Stormwater Memo Comment #16 for Stormwater Management requirements. (2) Any runoff that is going to the adjacent/neighboring properties is undisturbed, and there are no changes being proposed to the existing drainage patterns for these undisturbed areas. (3) To add additional information to the above response, per 6/9/2026 meeting with the City, applicant stated that all houses (Impervious Areas) will drain from rear of lot to front of lot (drain to street R/W) and therefore will discharge to the infiltration basins. It was specifically mentioned that this applies to Lots 33-37 and 46-50. Comment closed. 5 Wet Pond (1) Aquatic Bench: The proposed wet detention ponds must incorporate aquatic benches in accordance with section 3.10.3 of the SWDSM. This will have an effect on the configuration of the ponds as presented in the concept plan. Please revise the design to account for the contours (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Acknowledged. Stormwater management wet pond no longer in project; therefore, comment N/A (Typical). Department of Stormwater Management Page 4 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE associated with the aquatic benches. A minimum 10-foot- wide aquatic bench around the perimeter of the wet stormwater detention facility (with exception of the forebay area) with the inside edge of the shelf 6” below the permanent pool level and the outside edge 6” above the permanent pool level with a resulting slope of 10H:1V. 6 Wet Pond (1) The wet stormwater detention facility must incorporate several (minimum of three (3)) diverse native species of shallow water emergent and shall land herbaceous vegetation on the vegetated shelf. Landscaping meets requirements of the Wet Detention Practice Landscaping Criteria. (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Comment N/A. 7 Wet Pond (1) Bottom of all detention and retention ponds graded shall have a slope of not less than 0.5% towards the outlet structure(s) and side slopes no steeper than 3:1 unless adequately protected. (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Comment is still applicable. All ponds need to comply with comment. (2) Please see sheet C3-00 for revised basin grading. A 0.5% slope towards the outlet control structure is shown where applicable. (3) Per coordination with the City, infiltration basins do not need to provide the min. 0.50% slope towards the outlet structure(s). All other types of ponds would need to meet this min. slope requirement. Infiltration basins can be sloped 0.0% along the bottom of the basin. Comment Closed. 8 Wet Pond (1) Total water balance and base flow conversion computed using Equation 4.11-1 and 4.11-2 or other approved methodology in Low Impact Development in Coastal South Carolina manual. (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Comment N/A. 9 Wet Pond (1) Documentation that the permanent pools will not draw down by more than 2' after a 30-day summer drought (see (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Comment N/A. Department of Stormwater Management Page 5 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE equations in Wet Detention Pond Design Criteria in Low Impact Development in Coastal South Carolina manual) 10 Wet Pond (1) Geotechnical testing and analysis as necessary (see under table 4.11-1 in Low Impact Development in Coastal South Carolina manual). (1) Geotechnical evaluations have been completed, including infiltration testing and seasonal high water table determination, and results are summarized in the Stormwater Memo. (2) Complied. 11 Stormwater Management BMPs (1) Geotechnical testing and analysis as required per City 2025 design manual and Low Impact Development in Coastal South Carolina manual). Infiltration rates, seasonal high-water table, number of tests, etc. to be determined. Refer to Appendix B in LID in Coastal South Carolina manual and City Design Manual Sections 3.10.4, Section 6.9, Technical Procedure Document #9. (1) Geotechnical evaluations have been completed, including infiltration testing and seasonal high water table determination, and results are summarized in the Stormwater Memo. (2) Number of test pits/infiltration test borings required needs to comply with Appendix B SC LID manual. Please incorporate all of Appendix B requirements into project design. For example, Infiltration Basin #1 will require approx. 5 total test pits/infiltration tests. Test locations should be equally spaced within the Infiltration Basin footprint. Testing needs to include Seasonal high-water table as well. (2) Through conversations with the City of Charleston and third-party reviewer, this will not be a requirement at this time. Kimley-Horn is aware this will be reviewed in full TRC. (3) Comment Closed. 12 Wet Pond (1) Permanent pool depth not to exceed 8' or be less than 3'. The 4 wet ponds as currently shown and modeled are not providing the required min. 3’ permanent pool depth. (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Comment N/A. 13 Wet Pond/Detention Pond (1) Per Section 3.16, An access easement with a width of 20 feet, minimum, shall be provided from the right-of-way to the pond. In addition, the entire pond and sufficient access room on the perimeter shall be included as part of the drainage easement that will include a minimum width of 20 feet outward from the top of the bank for the bench. The (1) Drainage and access easements have been incorporated into the conceptual layout to meet minimum width and access requirements of the City of Charleston Stormwater Design Standards Manual. (2) City requires 20’ outward from the top of the bank with max 10:1 slope. 20’ width is not provided for any of the Department of Stormwater Management Page 6 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE perimeter easement around the top of the bank of a pond shall have a maximum cross slope of 10H:1V. Infiltration Basins. Please provide min. 20’ width at required slope. In addition, for Basins adjacent to proposed street right-of-way, applicant needs to provide min. 5' from back of sidewalk at max 10:1 slope. If 20' is not being provided then please detail how access will be made available. (2) Per section 3.16.4 of the City of Charleston Stormwater Design Standards Manual, an easement width of 10’ is acceptable. Where basins are adjacent to proposed right-of- way (basin 3), 5’ at max 10:1 is provided. (3) 2026-07-08 email, Design Exception agreed to with City for Basin #3 & #4 with 5’ width from back of sidewalk at 10:1 slope. Design Exceptions will be formally reviewed and approved by the City during RCP submittal review process. 2026-06-09 meeting & email, Per 3.16.4, City agreed to 10’ easement for infiltration basins only. If infiltration basins are changed to detention basins, then a 20’ easement width would be required. Comment Closed. 14 WQv & Wet Pond (1) Determine the rainfall depth to be used for WQv required based on Table 3-6 (tiered system, see equation 3-1). Note that WQv is based on the rainfall depth applied to the entire construction project area. Different tiers may be used for different portions of the site if different practices are used. Designer may manage more on one area than other to compensate for portions where they cannot obtain water quality volume. Wet Ponds (Detention) are Tier III = 2.8. (1) The Water Quality Volume (WQv) has been calculated based on the applicable Tier I and Tier II rainfall depth and managed through infiltration basin storage in accordance with the City of Charleston Stormwater Design Standards Manual. (2) In Stormwater Memo please explain why Tier II are being used with Pond #1 & Ponds #2 and why Pond #1 & #2 are using underdrains? (2) Only Tier 1 is being proposed now. Underdrains and Tier II practices have been removed. (3) Comment Closed. 15 Wet Pond (1) Ponds need to show the stage of the water quality volume based on the rainfall depth and show that the pond will drain longer than 24 hours and no more than 72 hours for that volume to meet the water quality requirement. Water (1) Infiltration basin drawdown times have been evaluated and demonstrate drainage within the required 24- to 72-hour timeframe following the design storm. (2) Complied. Department of Stormwater Management Page 7 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE Quality required volume begins at the Permanent Pool elevation and increases in stage until reaching the required water quality volume. 16 Wet Pond (1) The proposed stormwater practice must incorporate forebays as applicable with the SWDSM. While not required to be shown during the conceptual plan submittals, this will have an effect on the configuration of the ponds as presented. As a result, please make sure the potential loss of storage is accounted for in the design. The forebay shall be sized to contain 0.1 inch of runoff per impervious acre of contributing area. The forebay shall be a minimum of 2 feet deep with the top of the associated berm being no more than 0.5’ below the normal water level. The volume in the forebay counts towards the total water quality volume requirements of the BMP if it is above the normal water level. As an alternative, the forebay may be designed to meet a sediment trapping efficiency of 60 percent. (1) Pretreatment concepts have been incorporated upstream of infiltration basins where appropriate, and impacts to available storage volume have been accounted for. (2) Complied. Min. Depth of forebay requirements will be reviewed in greater detail during RCP submittal review process. 17 MTDs/ Wet Pond (1) MTDs are being proposed within the R/W and for treatment of a residential project. Manufactured treatment devices (MTDs), often referred to as water quality devices (WQDs), are not recommended and are typically not approved for subdivisions due to the long-term maintenance concerns for HOAs. If the applicant would like to propose the use of MTDs, additional discussions with the City's Development Services and Legal departments will be required. (1) Manufactured treatment devices are not proposed. Stormwater treatment is provided through infiltration basins and upstream pretreatment mechanisms. (2) Acknowledged. Stormwater treatment devices are no longer included in the project; therefore, comment N/A. 18 MTDs/ Wet Pond (1) If approved for the site, manufactured treatment devices (MTDs) are not permitted in the right-of-way and are not to be maintained by the City. Location will need to be discussed with the City and the long-term operation and maintenance (1) Forebay calculations and considered are provided in resubmittal. (2) Complied. Department of Stormwater Management Page 8 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE will need to be addressed in the Covenants for Permanent Maintenance of Stormwater Facilities agreement. New Plan Comments 2nd Review (2): 19 C3-00 (Grading and Drainage Plan) (2) Where are the Infiltration Basin Emergency spillways located? Please note this will be checked in greater detail during RCP submittal review process as more detailed information will be presented in the construction plans. However, applicant needs to be mindful of requirements for discharge rates, volumes, and stages onto offsite properties, cannot exceed existing conditions (discharge location specific) unless property owner is in agreement. (2) Please see sheet C3-00 for emergency spillway locations. Discharge going to adjacent properties will not exceed existing conditions, as these areas will be undisturbed. (3) Complied. 20 C3-00 (Grading and Drainage Plan) (2) Project Property Line Boundary along Fern Hill Drive, Infiltration Basin #4, Alfred Grant, and Pollard-Grand properties do not look correct, and do not match property linework that was shown on existing survey sheet in Submittal #1. IPF symbols are shown without property linework going to/through them, and property linework extends well into Fern Hill Drive. Correct Proposed Property Line Boundary, update project area if incorrect, and show existing property lines adjacent to proposed project (Alfred Grant, etc.). (2) Property linework has been corrected. (3) Acknowledged, comment closed. 21 C3-00 (Grading and Drainage Plan) (2) Driveway culverts for proposed subdivision entrance road appear to be required for Southwick Drive and Fern Hill Drive. Please refer to previously provided culvert pipe sizing requirements comment from Review #1. (2) Please see updated plans and model for culvert information. (3) Culverts added. Comment Closed. 22 C3-00 (Grading and Drainage Plan) (2) Is Proposed Grass Swale within 30’ City Drainage Easement intended to flow into Infiltration Basin #3? If so, Storm drain pipe will be needed. Grass channels will need to adhere to Open Channel requirements of Section 3.4.6.8 and City will need to approve easement width. 30’ easement width provided does not seem adequate to comply with Section 3.16.2. (2) Please see sheet C3-00 for updated grass swale. The proposed swale is now a 2’ depth V-shape swale with an 18” RCP pipe connecting to infiltration basin 3. (3) Applicant is showing a 30’ drainage easement. The City will need detailed computations showing that the flow is contained within the ditch and the culvert pipe meets design Department of Stormwater Management Page 9 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE requirements as a part of the RCP submittal review process. Comment closed. 23 C3-00 (Grading and Drainage Plan) (2) Position/move and add Inlets at proposed road entrances to pick-up as much onsite drainage as possible, and bypass offsite less. (2) Please see revised grading and drainage plan. (3) Looks like an additional inlet can/should be added on opposite side of street adjacent Basin #2 near intersection with Southwick Drive. This can be reviewed during RCP submittal review process. Comment closed. New Plan Comments 3rd Review (3): 24 C3-00 (Grading and Drainage Plan) (3) Infiltration Basin #5 will require pretreatment measures. In response, please describe the pretreatment measures. Provide calculations in Stormwater Report. Stormwater Memo - Maybank PUD Comments 1 (1) Provide ICPR Model Files. (1) ICPR model files have been provided with the resubmittal. (2) Complied. 2 All Sheets/ Calculations (1) Stormwater management design to adhere to 2025 Stormwater Design Manual. (1) Statement for stormwater management design to adhere to 2025 Stormwater Design manual is included within the Stormwater Memo. (2) Complied. 3 All Sheets/ Calculations (1) Please update Stormwater Management Device references throughout document/calculations to tie to 2025 Stormwater Design Manual BMPs. If utilizing Wet Pond, change to Wet Detention Pond. If utilizing Bioretention, change to Bioretention Basin. If utilizing Infiltration Basin, change to Infiltration Basin. (1) This comment is no longer applicable as wet detention ponds are no longer proposed. Stormwater treatment is provided via infiltration basins. (2) Complied. 4 1 (1) State the design follows the 2025 Stormwater Design Manual. (1) Statement for stormwater management design to adhere to 2025 Stormwater Design manual is included within the Stormwater Memo. (2) Complied. Department of Stormwater Management Page 10 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 5 1 (1) Include a description of how the conceptual design is consistent with the City’s adopted comprehensive plan (the Century V Plan) and the Johns Island Community Plan as relates to stormwater management and Low Impact Development (LID)/Green Infrastructure (GI) design elements. (1) The conceptual stormwater design is consistent with the City’s adopted Comprehensive Plan (Century V Plan) and the Johns Island Community Plan through the application of Low Impact Development (LID) and Green Infrastructure (GI) principles. The project prioritizes infiltration-based stormwater management, preservation of natural drainage patterns where feasible, minimization of impervious cover, and distributed stormwater treatment to reduce runoff volume and improve water quality. Proposed infiltration basins, vegetated buffers, and grassed conveyance features manage stormwater close to its source, consistent with City policies supporting context-sensitive development, protection of coastal resources, and reduced downstream impacts. These approaches align with the City’s long-term objectives for sustainable growth, resilient infrastructure, and environmentally responsible development on Johns Island. (2) Complied. 6 2 (1) D soils are being used in the CN calcs. Please add description of the dual HSG soils into the Narrative per City’s requirement to utilize the undrained soil type condition (i.e. for Type A/D soils, the Type D HSG classification is to be used in the hydrologic determinations) for new development and redevelopment projects. (1) Soils within the project area include dual hydrologic soil group classifications. In accordance with City of Charleston requirements, all hydrologic analyses (including Curve Number calculations) utilize the undrained soil condition, with dual HSG soils modeled as Hydrologic Soil Group D for both pre‑ and post‑development conditions. The Stormwater Memo has been updated to include this clarification within the soils and hydrology narrative, consistent with City stormwater design standards and Technical Procedure Documents. (2) Complied. Department of Stormwater Management Page 11 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 7 2 (1) Infiltration Rate: Refer to City Design Manual Technical Procedure Document #9, max infiltration rate is 3 in/hr after factor of safety incorporated unless design exception requested. Update narrative and calcs with infiltration rate to be utilized. (1) Max infiltration rate is mentioned. Design exception will be pursued. (2) City will need to review and approve the requested Design Exception. It is noted that only Infiltration Basin #3 will have an infiltration rate greater than 3.0 in/hr when incorporating the 2x factor of safety. • Please provide Separate Design Exception Request Letter per Section 4.10 and include Letter in Stormwater Memo. • In Narrative Soils Section where describe project Infiltration rates and the design exception, please include reference to the included design exception in the Stormwater Report. (2) An email has been sent to Yesim regarding requested design exceptions. (3) Per 2026-07-08 email, formal review of design exception request will be reviewed during RCP submittal review process. Applicant will need to submit design exception request letter during RCP process for review by the City. Comment Closed. 8 3 2.8.3 Site Planning The City requires the designer to consider the incorporation of low impact development (LID) or green infrastructure (GI) stormwater management techniques into the project to provide runoff reduction from the site along with enhanced water quality. Utilization of such practices may reduce the overall footprint of any proposed detention areas. Approaches to be considered are further detailed in section 2.8.3 of the SWDSM, and the resubmittal must specifically account for how each of these site planning and design elements (2.8.3.1 – 6) were addressed or considered. (1) LID techniques have been updated with a description included. (2) Complied. Department of Stormwater Management Page 12 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE Only 5 of the 6 low impact development techniques are mentioned. Please include the category “Minimization of Impervious Cover”. In addition, add and describe Infiltration Basin, preservation of Wetlands and natural drainage ways to appropriate categories. Also, update to change names of BMPs being utilized. 9 3 (1) Special Protection Area: Update the narrative to detail the requirements per 2025 stormwater design manual and state project meeting or not meeting X% required reduction. (1) Narrative detailing requirements per 2025 stormwater design manual and meeting. (2) Please update narrative SPA Section to replace 2020 Stormwater requirements with 2025 requirements. Narrative currently includes 2020 version 3.6.1 requirements. (2) Please see revised stormwater narrative for updated language. (3) Per original comment, in SPA and 1% analysis sections in narrative, state if project is meeting or not meeting SPA and 1% requirements. Per included tables of results, Project is NOT currently meeting 2-, 10-, or 25-year rate and volume reduction requirements. In addition, check tables reduction % numbers because many are incorrect. Results in these submittal #03 tables are significantly lower than Submittal #02 where Submittal #02 showed 40%-70% reductions. Project is required to meet SPA requirements. 10 4-7 (1) For all Tables, list % storm events with frequency storm events i.e. 2-year (50%) (1) % AEP storm event now listed. (2) Complied. 11 4 (1) Update Table 1.2, Percent Reduction Column numbers. Discrepancy with percent reduction numbers as numbers should be lower values. (1) All tables have been revised (2) Complied. 12 4-5 (1) Remove Tables 2.1-2.4 as the same 24-hour volume information is shown in Tables 3.1-3.2. (1) All tables have been revised (2) Complied. Department of Stormwater Management Page 13 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 13 4- 6 (1) Provide Table of POA-1 Pre & Post 2-yr, 10-yr, etc. storm events with Stages. (1) All tables have been revised (2) Please provide a table of POA 1 Pre & Post 2-yr, 10yr, etc. storm events with stages. (2) Please see Table 4: 24-Hour Runoff Volume Summary. (3) Complied. 14 6-7 (1) Tables 4.1-4.5: Update Stormwater BMP Name to tie to City Stormwater Manual BMP name. Add Bottom elevation, Permanent Pool elevation, Water Quality Volume elevation, and Top berm elevation to tables. (1) All tables have been revised (2) Please add bottom of elevation, permanent pool elevation, water quality volume elevation, and top berm elevation to tables. (2) Bottom elevation, water quality volume and top of berm have been added to table 5. As for permanent pool elevation, these are infiltration basins and are not designed to hold water permanently. (3) In table 5, the bottom elevation does not match the initial stage in the model. Please correct the initial node stages in the model or update the table if the table is incorrect. Please check all ponds, and if subsequent updates are made ensure latest design is incorporated throughout plans and models. 15 7 (1) Water Quality Volume – Report mentions several different rainfall depths (0.5”, 1”, and 2.8”). Please remove/update narrative based upon stormwater management devices proposed and adherence to City requirements. (1) Narrative has been revised to meet WQV requirements. (2) Complied. However, please explain in Narrative why Underdrains are being included for Pond #1 & #2 (Tier II). (2) Underdrains are no longer needed and have been removed. (3) Comment N/A. 16 7 (1) Describe and account for how water quality requirements will be addressed for rear lot drainage not routed through the proposed collection/conveyance and detention pond systems. The use of vegetated filter strip would be an acceptable approach; however, those buffers will need to be accounted (1) Rear yards are not treated due to site BMPs required WQVs, which is allowable per City of Charleston Stormwater. (2) Please refer to Plan Set comment #4 for additional requirements. If the applicant’s response/justification is that Infiltration Basins are oversized for the rear lots that bypass Department of Stormwater Management Page 14 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE for in the concept plans relative to grading and vegetation (preserved and/or planted) as well as locating those buffers within common HOA parcels as opposed to individual lots. the infiltration basins, this does not appear to be a correct statement. For example Basin #1 WQv calcs DA = 3.74 acres and Drainage Area map DA-2A.1 = 4.15 acres. Please review all other project areas/basins. Once the applicant determines their approach, this will probably require additional discussion with the City for City’s concurrence. (2) Please see revised post development drainage map and calculations for basins that bypass proposed BMP’s. These areas are treated as undisturbed and will not generate additional runoff to neighboring properties. (3) To add additional information to the above response, per 6/9/2026 meeting with the City, applicant stated that all houses (Impervious Areas) will drain from rear of lot to front of lot (drain to street R/W) and therefore will discharge to the infiltration basins. It was specifically mentioned that this applies to Lots 33-37 and 46-50. It is understood that all impervious areas will be treated in the infiltration basins, and impervious areas will not bypass the stormwater management infiltration basins. Rear lot areas consisting of grass areas only (or primarily grass areas, no house impervious areas) will drain offsite following the existing drainage patterns and therefore will bypass the infiltration basins. Comment closed. 17 8 (1) List, address and fully describe any design exceptions to be requested in accordance with Chapter 4 of the SWDSM. (1) Design exceptions for additional infiltrate have been listed. (2) Complied. If other Design Exceptions are requested, then please include them in the Design Exception Letter. See Stormwater Memo Comment #7 for complete applicable response and next steps. (2) Noted. (3) Applicant is seeking 2 Design Exceptions: 1: Infiltration rate exceeding 3 in/hr and 2: basin access of 5’ width from back of sidewalk at 10:1 slope. Applicant will be required to submit Department of Stormwater Management Page 15 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE Design Exception Request Letter for City’s review during RCP review submittal process. Comment Closed. 18 8 (1) A discussion of issues relating to other State and Federal permits needed or regulations to be followed. (2) Please address outstanding comment. (2) Wetland impacts have been submitted to the Army Corps of Engineers, and we are awaiting feedback. (3) Acknowledged. USACE Jurisdictional Determination to be reviewed during RCP submittal review process. During RCP submittal review process, please include description of wetlands, wetland impacts, associated permits, other permits required in the narrative. Comment Closed. 19 11 (1) Soils map shows B soils within Project Area. Please account for in Pre and Post CN calculations. (1) Modeling a more conservative D soil to ensure flows will adequately drain in a more conservative preliminary design approach. (2) Please account for soil group B (Seabrook loamy fine sand) for pre and post curve number calculations. (2) B soils now shown and accounted for in CN calculations. (3) Complied 20 Pre-/Post-Dev Drainage Maps 14-16 & 81-83 • Please provide TC flow paths on the Pre- and Post- Development Drainage Maps. • Provide Pre & Post Development Maps with Model Nodes and Links shown. Ensure Map and calculations naming conventions are consistent. • Pre & Post Development Drainage Area Maps & calculations need to account for Offsite DA from Fenwick Woods Residential HOA (Exist. Wet Pond, located adjacent Prop Pond #2) with apparent discharge to existing drainage ditch & eventually to POA 1. Also, need to evaluate offsite drainage along Southwick Drive to the west to determine drainage area that reaches POA 1. (1) Revised. (2) Please provide the flow paths for pre- and post- development drainage maps. Also, please add the links and nodes to the drainage maps. Change the legend from Woods, Poor to Woods, Good as curve number calculations use Woods Good conditions. Update the legend for the post- development drainage map to reflect the solid blue color. Also, please use a curve number value of 100 for all proposed wet ponds. (2) Flow paths provided in pre and post development drainage exhibits. See Appendix B – 1b and Appendix C – 1b for drainage maps with link and node information. Legend has Department of Stormwater Management Page 16 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE • Pre & Post Development Drainage Area Maps need to show all drainage area boundaries while still showing the Project Property Lines. Many of the drainage area boundaries are not shown for the Pre and a couple are not shown for the Post. Please add road labels and show existing contours with some contour labels enough to evaluate general basin boundaries. • Change Legend from Woods, Poor to Woods, Good as CN calcs use Woods Good Conditions of 77 for D soils. • It appears Existing Wetlands & Prop. Wet Ponds are calculating CN with 98 per City Design Manual Technical Procedure Document #6. Suggest add a separate column for Wetlands/Prop Wet Ponds CN calculations and add a separate pattern to show in DA maps. • For 1% AEP Analysis per Section 3.9.4 and Technical Procedure Document #4, Offsite Undeveloped properties use Current Zoning, Offsite Developed properties use land use curve numbers. The Offsite Wood areas need to be changed to the Current Zoning. Update land use for recent project developments. Review and update CN. Review and update TC calcs based upon current land use/recent project developments. been changed to Woods, Good. Drainage area boundary in legend showing as solid line. Wet ponds are no longer proposed; they have been converted to infiltration basins. (3) Items addressed per original comment except for the following: Evaluate and include Offsite DA from Fenwick Woods Residential HOA….. into 100-year (1%) analysis (POA analysis). This will be reviewed in greater detail during RCP submittal review process. Comment Closed. 21 15 & 82/83 (1) Update & Review CN calcs. The “Total” Row is not adding all the basins areas. (1) Calcs revised (2) Pre-development curve number calculations do not account for all basin areas. (2) Please see updated drainage report and ICPR model for updated pre-development calculations. Please see updated drainage report and ICPR model that reflects these changes. (3) The pre-development curve numbers used in the model do not match the calculated curve numbers presented on page 132 of the report. Please update either the model inputs or Department of Stormwater Management Page 17 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE the report calculations so that the values are consistent throughout the analysis. 22 16 3.4.5 Time of Concentration Shallow concentrated flow cannot exceed 1200 ft. (1) Shallow concentrated flow does not exceed 1200 ft (2) Basin 1B and 1D both exceed 1200 ft for shallow concentrated flow. (2) Please see updated TC calculations. (3) Complied 23 Post-Dev Drainage Maps 81-83 (1) Post Development Drainage Area Map and CN calcs need to show and label all onsite drainage areas that bypass the stormwater management treatment devices. Ensure the bypass drainage areas are properly accounted for in the calculations and models. Some of the Rear of Lots are not draining to the Stormwater Management Devices. Most of the Onsite Woods shown will not be Woods, but wetlands, stormwater management device, and grass areas. (1) DA maps revised (2) Please show and label all onsite drainage areas that bypass the stormwater management treatment devices. (2) Please see post development drainage map for added bypass areas. (3) Complied 24 Pre- and Post- Dev CN Calcs 15 & 82 (1) If end up using grass areas for CN in pre-development, please explain if using fair grass. Please explain poor grass use for post-development CN calculations. (1) Using good condition for all grassed areas (2) Please explain the use of grassed (poor) for on-site disturbed areas. (2) Please see updated basin calculations where no grassed (poor) area is accounted for. (3) Complied 25 TC Post Calcs (1) If end up using values above min. TC of 6 min., please include TC for post-development. (1) TC calcs not needed (2) Please provide the time of concentration calculations for post-development. (2) Please see updated time of concentration calculations. All disturbed areas are modeled with a TC of 6 min, while all undisturbed areas have calculated time of concentrations. Department of Stormwater Management Page 18 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 26 47 & All (1) The manning’s N value used for Existing & Proposed RCP pipe of 0.011 is not typically used. Higher values are typically used. Justification for this value will need to be provided. (1) Manning n values state 0.011 – 0.013. Does city require 0.013? (2) Where is the above 0.011-0.013 information taken from? Typical Manning’s n value commonly accepted for concrete pipe is 0.013. If applicant intends to use 0.011 detailed justification will need to be submitted for review and approval during RCP submittal review process. (2) Mannings n for concrete pipe updated to 0.013 in model. (3) Complied 27 55 & All (1) Why are Proposed improvements shown/included in the Existing Conditions model? Pg 55 has information on Infiltration Pond 4, Bioretention. Existing conditions output pages have many examples of proposed information included. (1) No longer included (2) Complied. 28 172 (Wet Pond) (1) Please check all Pond Outlet Control Structures updating orifice and weir sizes, elevations, and associated notes. Typical comment applicable to all 4 wet detention ponds: Pond #1 low flow orifice invert of 17’ coincides with bottom elevation of wet pond. Wet pond requires a permanent pool; therefore, low flow orifice with bottom of pond @ 17’ would need to be higher at approx. 20.5’ in order to provide the min. 3’ permanent pool depth and provide the 0.5% slope along bottom of pond. In addition, water quality volume stage/storage begins at the Permanent Pool elevation. (1) Outlet control structure dimensions have been reviewed and coordinated with revised weir configurations. (2) Complied. 29 Infiltration Basins (1) If utilizing Infiltration Basins, a low flow orifice would not be installed in the Outlet Control Structure as the intent is for the stormwater to infiltrate into the underlying soils. However, an overflow weir for larger storm events could be utilized. Update Calcs and models if/where utilizing an Infiltration Basin. (1) Infiltration basins are modeled without low-flow orifices, with overflow structures provided for larger storm events. (2) Complied. Department of Stormwater Management Page 19 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 30 172 (Outlet Control Structure) (1) Pond #1, with weir #2 bottom width of 25’, what is the size (Length x Width) of the Outlet Control Structure? This comment may be applicable to other Pond Outlet Control Structures. Please review all Pond Outlet Control Structures. (1) Weirs modeled separately from OCS. Widths will be top. (2) Complied. 31 Input Report (1) Please include the simulation manager ICPR input report into the stormwater memo for pre- and post-development scenarios. (1) Simulation manager included (2) Complied. 32 Modeling Existing Wetlands (1) Modeling Existing Wetlands: Refer to City Design Manual Technical Procedure Document #6. Individual wetlands must be modeled with a Curve Number of 98 unless documented. (1) Existing wetlands are modeled with CN 98 (2) Please include a wetlands classification in the land use category and apply a curve number of 98 for all related calculations. (2) Please see revised basin calculations for existing wetlands land use category. (3) Complied 33 Tailwater (1) Please state which tailwater is used in the ICPR models i.e., static and dynamic and describe how starting elevation was determined. (1) Tailwater is 6” above normal crown of Southwick Drive (2) Please include a statement in the narrative on why you used a value of 13.89 ft for the boundary condition. (2) Please see narrative for statement of chosen tailwater value. A static tailwater of 13.89’ was used because this is the downstream invert elevation of the existing 36” RCP pipe at the POA. Since there is an elevation change of over 5’ across the existing ditch that the site outfalls to, a free outfall can be modeled. (3) Complied 34 1. Table of Contents (1) Please provide a table of contents. (2) Please provide a table of contents. (2) Table of contents is now provided at the beginning of the stormwater memo. (3) Complied Department of Stormwater Management Page 20 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 35 Exhibits (1) Please provide a FEMA, USGS, Soils, and NWI exhibit and ensure the project area is shown on each exhibit. The FEMA FIRM reference and associated flood zone(s) must be updated to reflect the new Charleston County flood maps that became effective on 01/29/2021. (1) Exhibits are provided (2) Please identify the site location on the FEMA FIRM map. (2) Please see updated FEMA FIRM map. (3) Complied 36 303d (1) Please list the nearest SCDES Water Quality Monitoring Station (WQMS) that the site’s stormwater discharges drain to and the waterbody on which it is located (If nearest WQMS is listed on the latest 303(d)). (2) Please address outstanding comment. (2) Please see the third paragraph of the Background section. (3) Complied 37 Disturbed Area (1) Please include the total disturbed area in the stormwater memo. (1) Total disturbed area included (2) Please include the total disturbed area in the stormwater memo. (2) Please see the third paragraph of the Background section. (3) Complied 38 Maintenance (1) Please include a summary of the maintenance of the stormwater system and arrangements for post-construction maintenance responsibility. (1) Maintenance plan added (2) Complied. 39 3.4.6.2 Culverts Please include a section in the Stormwater Memo describing the proposed culvert crossing (E.0 to E.1) design and demonstrating how it meets the requirements of the referenced manual section. Provide sufficient design information to confirm that the crossing will not create adverse impacts to upstream conditions and that adequate roadway clearance is maintained. A full culvert analysis is not required at this stage; however, the applicant should ensure the proposed culvert is planned (1) Section and language added (2) Pipe link “Dual 40 RCP” requires a 25 percent factor safety. Please reduce the pipe size in the model or utilize a bottom clip to obtain the necessary factor of safety. Also, please include a statement in the narrative explain how the use of a smaller culvert or bottom clip was utilized to satisfy 3.4.6.2. (2) Bottom clip of 1.125’ assigned to “Dual 54” RCP” link to account for the 25% factor of safety required in section 3.4.6.2. This methodology was applied to all culverts in the model. (3) 4 total culverts underneath roadways are now in project. All of these culverts require the 25% factor of safety. The dual Department of Stormwater Management Page 21 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE in accordance with the 2025 City of Charleston Stormwater Design Standards Manual (SWDSM), Section 3.4.6.2. 54” pipe culver factor of safety is correct, and acceptable. The other 3 culverts either need the factor of safety added or corrected. For the 36” culvert, the factor of safety is not meeting the required 25%. It appears that there are 3 total proposed culverts in the model. Please note the project is showing 4 proposed culverts. This will be reviewed in greater detail during RCP submittal review process. Comment Closed. 40 3.9.3 Project Discharge The Drainage Memo states that “all on-site runoff for Maybank PUD will discharge directly to a right-of-way and will not impact any other private properties without permission from the site owners and the City of Charleston.” However, the plans show outfalls discharging to a private drainage easement and to private property (TMS No. 279-00-00-002). All designs must account for discharge rates and volumes to downstream and adjacent properties when easements or permissions are not in place. Unless post-development discharge rates and total volumes match pre-development conditions at these discharge points, a legal right of discharge or a properly recorded drainage easement is required. • Provide City of Charleston Drainage Easements for the ditch outfall, and provide documentation that the existing private drainage easement permits the proposed outfall in the design. • For the outfall to private property (TMS No. 279-00-00-002), ensure the design meets 2025 SWDSM requirements and does not increase total discharge volume, or obtain written permission from the property owner. (1) Easements and language included (2) Discharges onto Adjacent properties is discussed in other comments, please refer to those comments. For existing drainage ditch, applicant has provided Recorded Plats as Exhibit N within Maybank PUD document. For the existing drainage ditch, a proposed COC Drainage Easement that meets City requirements per 3.16.2 is required at this stage of review (with the appropriate maintenance shelf). The existing drainage ditch is over 4’ deep for the portion adjacent to Infiltration Basin #2 and other sections of the ditch are at least 2’ deep. Then City will need detailed computations showing that the flow is contained within the ditch and the culvert meets design requirements as a part of the RCP submittal review process. Also make sure COC DEs for all proposed pipes where applicable are shown. As currently shown, there are concerns that a sufficient COC DE for the existing ditch will not be able to be provided, especially near Lot 62 and this may affect Infiltration Basin #1 & #2 size/layout/configuration. (2) Please see plans for updated COC drainage easement where the ditch reaches 4’ in depth. Department of Stormwater Management Page 22 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE Please see stormwater calculations for post developed conditions and staging of existing ditch. (3) For the existing drainage ditch and proposed required City easement, applicant is showing 15’ easement width apparently from near the top of existing bank on each side of existing ditch where project property occurs. Existing drainage ditch exceeds 4’ depth from Infiltration Basin #1 through downstream end of property. Please provide an exhibit (to include showing existing and proposed contours, existing spot elevations in the bottom ditch, etc., depth of existing ditch at various locations throughout site) that does a better job of presenting the proposed easement information with explanation and justification for proposed drainage ditch easement width. City will review information once provided. 41 Easements (1) Per Section 54-822(c) of the Zoning Code, easements, when required for drainage or sewage for the area to be subdivided, shall be of such width as necessary to permit proper construction of drainage facilities based on the drainage system of the area. No subdivision shall block or obstruct the natural drainage of an adjoining area. Existing natural drainage shall be maintained or replaced where possible or feasible. Please address how this requirement is to be satisfied as part of the site design. Also include the identification of any off-site drainage easements needed for stormwater conveyance or storage. (1) Easements provided. (2) Memo includes discussion on required easements for storm drain pipes, channels, and stormwater management ponds; however, please update based upon reviewer comments and applicant responses. In addition, add description of existing drainage ditch and provide a proposed City drainage easement for the existing drainage ditch. (2) Please see updated plans for additional easements based on City comments. (3) Complied. 42 USACE (1) Provide a Unites States Army Corps of Engineers (USACE) Jurisdictional Determination and the accompanying wetland survey plat. (1)A USACE Jurisdictional Determination and accompanying wetland delineation exhibit have been provided. (2) Army Corps of Engineers Jurisdictional Determination has not been included. Didn’t see in submittal package if included. Did see Wetland plot map included in Exhibits with Maybank PUD document. Please provide USACE Jurisdictional Department of Stormwater Management Page 23 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE Determination & indicate where the documents are located within the submittal documents. (2) USACE determination is still underway. Based on meeting with City and 3rd party reviewer, this can be looked at during full submittal. (3) Acknowledged. USACE Jurisdictional Determination to be reviewed during RCP submittal review process. Comment Closed. New Stormwater Memo Comments 2nd Review (2): 43 Calcs (2) 0.5’ Min. Freeboard above 100-year WSEL NOT provided for most of the Infiltration Basins. Check all Infiltration Basins and provide min. 0.5’. (2) 0.5’ min freeboard now met for all infiltration basins. (3) Please see comment #14 above about the node initial stage invert not matching the bottom elevation. 44 C3-00 (Grading and Drainage Plan) (2) Reviewing existing ground elevations and contours on grading plan and from existing survey from submittal #1, Infiltration Basin #4 SHWT elevation = approx. 20.75’ (18” below existing ground of approx. 22.25’) is higher than elevation of bottom of infiltration basin (20.50’). 0.5’ required separation from bottom of basin to SHWT elevation is not provided. (2) Please see updated plans and storm calculations, Infiltration basin #4 has been raised to have a bottom elevation of 21.25’, given the SHWT being at 20.75’. (3) Please update the initial stage of node, “INFILTRATION BASIN 4”, in the post-development model to an elevation of 21.25’ and update Table 5. 45 C3-00 (Grading and Drainage Plan) (2) How is existing commercial property (Bright Oaks Property) being accounted for in the project? Please describe stormwater management approach for this portion of the project. The existing pond does not appear to be an infiltration basin. Per aerial images it appears to be a wet pond. On grading plan, existing pond is labeled as an existing dry pond, please verify. Update plans and stormwater memo. (2) The Bright Oaks Property will not be receiving any stormwater improvements. Labels updated throughout plan to show an existing wet pond. (3) Per 2026-06-09 meeting with the City, applicant provided the below existing preschool information: Offsite developed Property included within PUD. Not changing existing preschool development, being included because need to include Commercial property component in PUD. Comment Closed. Department of Stormwater Management Page 24 of 24 Stormwater/MS4 Review Comment Sheet Maybank PUD (PUD and Concept Plan) - PUD2026-000033 # SHEET / PAGE # COMMENT RESOLUTION/RESPONSE 46 Calcs & C3-00 (Grading and Drainage Plan) (2) Basin #2 100-year and less storm events WSEL will bypass pond by discharging/overtopping proposed grass channel and convey downstream. (2) Please see updated stormwater model and report, the channel is no longer overtopping. (3) The upstream and downstream invert of the grass channel stages higher than 22 feet for the 100-year, thus the flow will not be contained in the grass channel. Please update the channel dimensions so that the flow will be contained. 47 StormWise Model (2) Pipe link “Existing 18 RCP” has a downstream invert of 15.68 ft in the pre- and post-development model and the survey shown on sheet C1-00 shows an invert of 15.65 ft. Please correct the pre- and post-development model to match the survey. (2) Please see revised ICPR model for corrected downstream invert elevation of 15.65’. (3) Complied. 48 StormWise Model (2) For simple basin “DA-1D” please use the rainfall name, Scsiii for post-development. (2) Please see revised ICPR model, DA-1D Offsite is using the Scsiii rainfall name. (3) Complied. 49 StormWise Model (2) Please update the Post-Development Drainage Area Map to match the inputs used for the post-development simple basins. (2) Please see updated Post Development Drainage Area Map, all drainage areas match inputs used for simple basins. (3) The Post Development Drainage Map does not match the time of concentration values in the model for basins, DA-2A.1 (UNDISTURBED), DA-1D OFFSITE, DA-1E OFFSITE, and DA-1B. City of Charleston Department of Parks Technical Review Committee Comments Submitted by: Rodney H. Porter, PLA porterr@charleston-sc.gov City of Charleston, Department of Parks, 823 Meeting Street, Charleston, SC 29403 843.637.9518 (m), 843.724.7322 (o) EREVIEW COMMENTS ______ COMMENTS ______ NO COMMENTS 1. There are no comments. PROJECT ID: PUD2026 -000033 AGENDA #: 4 PROJECT NAME: MAYBANK PUD AND CONCEPT PLAN DATE: 08/06 /202 6 ADDRESS: 3298 MAYBANK HWY REVIEW: 3RD REVIEW TMS #: C2790000010 REVIEW TYPE: PUD AND CONCEPT PLAN Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 1 of 4 ENGG-PUD2026-000033_3rd Review-Maybank PUD and Concept Plan Date: To: 12-Mar-2026, 04-Jun-2026, 06-Aug-2026 Kimley-Horn and Associate, Inc. Project Name: Project Type: Maybank PUD and Concept Plan PUD Master Plan and Concept Plan From: Moshtaba Vedad, Civil Engineer I vedadm@charleston-sc.gov or 843-619-6086 Project TMS: Project ID #: C279-00-00-010 PUD2026-000033 Submittal Review #: 1st review – Comments Provided 2nd Review-Paperwork 3rd review-Paperwork Documents Reviewed: Ref# Review # Document Title: Rev Ref# Review # Document Title: Rev SWDSM all City of Charleston Storm water Design Standards Manual, January 2020 Please provide a response to each review comment below (match text coloring to review for clarity) to show how the comment was addressed within your submittal. This will help provide a thorough project review and ensure proper communication between the reviewer and the applicant. With out responses to comments, subsequent submittals may not be reviewed. Resolution column is for City use only – A blank cell in this column indicates issue is still outstanding. Please return the completed Word document to the Engineering Division concurrently with your next TRC (re)submittal. # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 1. All PDF Files: Please provide functional PDF bookmarks with sheet/page numbers (and abbreviated sheet/chapter titles) to expedite review. Check function of ‘action’ prior to submitting. Functional PDF bookmarks with sheet/page numbers is provided. Resolved 2. Cover: Include City PUD ID # PUD2026-000033 on cover. Provide a description of all work being done at this stage. PUD review case # with a description of work to be completed is included on cover sheet. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 2 of 4 ENGG-PUD2026-000033_3rd Review-Maybank PUD and Concept Plan # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 3. Cover: Add the new 811 number with logo for the Palmetto Utility Protection Service (PUPS). Place Logo on any sheet(s) shows Excavation, Demolition, and any tree removal. New 811 number with logo has been included on all sheets. Resolved 4. Site Plan – Lots: Although individual lots do not have to be shown, the types of lots/uses proposed should be provided (e.g., single-family, townhouse, multi-family, commercial, civic) All lots are proposed to be single-family. Additional information is provided on the site development summary within the land use section of sheet C2-00. Resolved 5. Site Plan: Open space, public use areas, amenity areas and recreational areas, identify location (Provide more detail on Open Space). For PUD projects, label Street Types Requested information included within the Site Plan and Open space Plan. Resolved 6. Site Plan – Streets: Show proposed street layout within the development including connections to existing streets and adjacent properties. Streets should be identified as public or private. Note R/W width and provide all right-of-way elements. Street layout is provided. Additional information to note R/W widths and maintenance responsibilities is included on the Site Plan. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 3 of 4 ENGG-PUD2026-000033_3rd Review-Maybank PUD and Concept Plan # Sheet/ Page # Review Comment Response (Applicant) Resolution (City Staff) 7. Existing Conditions / Survey: Provide a topographic survey of the existing conditions and a boundary survey or plat, both properly certified (signed and sealed) by a Land Surveyor registered in South Carolina responsible for the preparation of the survey. All Surveyed sheets must be signed and sealed by a surveyor registered in South Carolina responsible for the preparation of the survey. Surveyor is obtaining additional information as it relates to other comments within this concept review and was not able to return prior to resubmittal. A signed and sealed certified copy of the survey will be provided prior to Concept Approval. Paperwork 8. Site Plan – Streets: Rights-of-way/Streets: show the locations, names, and ROW widths of all existing streets within 150 feet of the property boundary with ownership and maintenance (state, county, city, community, private etc.) noted. Show all proposed improvements to existing public roadways (i.e., widening existing streets for turn lanes, etc.). All proposed improvements are being shown within row. Names of streets will be reserved at time of preliminary plat. All existing streets and maintenance responsibilities are provided. Resolved 9. Site Plan – Streets: Provide ROW Cross-Section or roadway typical to show roadway length and width, sidewalk width, Curb and gutter dimensions and concrete PSI being used. Show all types of HMA being used, indicate Yield (lb./sq. yd or inches compacted). No typical are shown in plan sheet C2-00 Multiple typical sections are being proposed as part of this PUD. All typical sections are provided on sheet C2-00. Additional notes for HMA, curb and gutter, concrete sidewalk, etc. are provided within the Road Notes. Paperwork 10. Site Plan: Provide a concept site “Master Plan” layout with principal dimensions. This must be prepared by a professional land. surveyor, Civil Engineer, or professional land planning consultant. Noted. Resolved 11. Site Plan: Pedestrian trails and bike paths: Show circulation within the Development if it will be in proposed design include connections to existing streets and adjacent properties. Identify whether items will be within or outside of proposed ROW areas. Note width of trails and bike paths. Pedestrian trails and bike paths are provided. See open space plan. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 4 of 4 ENGG-PUD2026-000033_3rd Review-Maybank PUD and Concept Plan 12.. Grading and Drainage.: Provide a complete grading and drainage plan, labelling all drainage stormwater pipes and structures. Clearly illustrate intended direction of stormwater run-off on all surfaces. Complete grading and drainage plan with drainage intent clearly illustrated is provided. Resolved 13. Grading and Drainage: Provide all the information for any temporary Grading (cut and Fill) and drainage for this stage. Ensure all easements shown are consistent with the width requirements of the City’s Stormwater Design Standards Manual (SWDSM). Cut and fill provided on grading plan. All easements shown are consistent with City design standards manual. Resolved 14. Utility Plan: Provide a complete Utility Plan, showing all existing and proposed connections to water, sewer, electric power, and gas, as applicable. Provide a conceptual Utility Plan, showing any existing utility easements, including any to be abandoned, or relocated. Show new utility easements for new transmission lines (water, sewer, gas and/or electricity). Complete Utility Plan is provided. Electric power, gas, etc. shall be coordinated by owner within the ROW or GUE as needed during preliminary plat plan review process. Resolved 15. PUD: Provide letter from St. John’s Water Co., Inc indicating public water and/or sewer capacity and availability for all the proposed new developments. Letter from St. Johns Water Co is provided. Resolved Department of Public Service – Engineering Division Engineering Review Comment Sheet Page 5 of 4 ENGG-PUD2026-000033_3rd Review-Maybank PUD and Concept Plan Approval Conditional Approval Comments Agenda Item #_04_ 1 CITY OF CHARLESTON DEPARTMENT OF TRAFFIC & TRANSPORTATION TRC REQUIREMENTS TRANSPORTATION PROJECT MANAGEMENT DIVISION (843) 724-7372 WallaceJ@charleston-sc.gov SITE: Maybank PUD and Concept Plan DATE: 8/06/2026 TMS #: 279-00-00-010 PLEASE NOTE: Final approval is contingent upon implementation of comments. 3rd Review Comments: TRC-PUD2026-000033 No TRC Comments. Other comments: 1. Request from Mayor at T&T Committee – Create an easy to understand aerial/concept plan showing the final configuration of the signal, roadway network, and Heritage driveway.

Source: City of Charleston website. First collected Oct 23, 2026.