RecordWell Data

DRB Meeting Results

City of Charleston · Berkeley County · meeting of Aug 3, 2026 · Agendas

Open the original document More from City of Charleston

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF CHARLESTON DESIGN REVIEW BOARD MEETING RESULTS AUGUST 3, 2026 4:30 P.M. 2 GEORGE STREET BOARD MEMBERS PRESENT: Erin Stevens, Ben Whitener, Lucas Boyd, Ashley Jackrel, Bill Eubanks, Adriana Carson STAFF MEMBERS PRESENT: David Meeks, DRB Administrator; Brad Thomas, Staff Architectural Planner; Patrick Carlson, City Clerk Office A. APPLICATIONS 1. 969 Harbor view Rd. James Island | Council District 12| TMS #428-16-00-001 | DRB2026-000371 Requesting demolition approval for a 1-story ranch house built in 1970. Owner: Russell Bauman Applicant: Jonathan Pitts DECISION: APPROVED MOTION: Demolition approved MADE BY: Boyd SECOND: Eubanks VOTE: FOR: 6 AGAINST: 0 2. 975 Harbor view Rd. James Island | Council District 12| TMS # 428-16-00-002 | DRB2026-000372 Requesting demolition approval for a 1-story ranch house built in 1970. Owner: Russell Bauman Applicant: Jonathan Pitts DECISION: APPROVED MOTION: Demolition approved MADE BY: Boyd SECOND: Eubanks VOTE: FOR: 6 AGAINST: 0 Design Review Board Meeting Results | August 3, 2026 Page 2 3. 1614 Grimball Rd (at Folly Rd) James Island | Council District 12| TMS #427-00-00-021, 022, 431-00-00-228 | DRB2026-375 Requesting conceptual approval for a new mixed-use project with a mini-golf course, a 2-story anchor/retail building and separate parking garage with offices. Owner: Scan Assets Applicant: MPS/Jennifer Johnson Split MOTION: Conceptual approval for the main building and site. Deferral for a restudy of the parking garage/office building. With staff comments 4, 6, 7, 8 and Board comment to restudy the HC parking and access situation. MADE BY: Boyd SECOND: Eubanks VOTE: FOR: 6 AGAINST: 0 Staff Comments: 1. Staff feels the office portion of the garage building needs more verticality, particularly in the concrete portion. 2. The corner curtain wall of the office portion is not integrated with the concrete masses as a whole. 3. Staff recommends a slanted roof on the office portion of the garage, to tie it in with the main building better. 4. There are quite a few differences between the renderings and the site plan vs the landscape plans around the main building, regarding the sidewalk, stairs, ramps and planting beds. These all need to match so we can better understand the design. 5. Staff likes the waves in the screens at the parking garage. (as seen on the screening system detail page) Perhaps the waves also wave horizontally at the top of the panels rather than straight across at the top. 6. By Preliminary review, the landscape plans should also include the mini-golf course. From what we understand the applicants plan on showing much more landscape around the mini-golf fairways than what they are currently showing. 7. By preliminary review staff will want to see details for the retaining wall that will run along Grimball Rd. and landscape to soften the wall. 8. By preliminary review, please include more detailed plans for the center of the golf area where the Tiki hut is located, including the decking, the hut and the seating. Staff Recommendation: Conceptual approval of the main building and site, and deferral for a restudy of the office portion of the garage building. Design Review Board Meeting Results | August 3, 2026 Page 3 A. MINUTES 1. Review of Minutes from the July 6 Meeting DECISION: APPROVED MOTION: Minutes approved MADE BY: Eubanks SECOND: Jackrel VOTE: FOR: 6 AGAINST: 0

Source: City of Charleston website. First collected Oct 23, 2026.