CITY OF WESTMINSTER REGULARLY SCHEDULED MEETING
October 28, 2024 @ 5:00 PM
Westminster City Hall
100 E. Windsor Street, Westminster, SC
Call to Order
Certification of Quorum
Invocation & Pledge of Allegiance
Public Comments:
The floor is now open for public comments. Citizens of Westminster or others who have registered for time with the
Clerk can now address Council for any matters on tonight’s agenda or other matters you wish to bring before the
Council. Speakers are allowed for up to 3 minutes and possibly longer if that Speaker is recognized in advance as
representing a larger group with similar concerns. To preserve the decorum of this public meeting and to allow
adequate time for discussion among the elected membership of City Council, this will be the only time we will
receive unsolicited comments tonight from the public.
Comments from the Mayor and Council
Routine Business
None.
Old Business
None.
New Business
1. Consideration to authorize the City Administrator to execute a Construction Contract with
Mammoth Sports Construction, LLC, in the amount of $5,042,695 to construct recreation
facilities as described in the construction contract.
The Recreation Planning Committee met October 15, 2024, and October 22, 2024, to review the
layout and budget proposal as attached. On October 22, 2024, the Recreation Planning Committee
unanimously recommended the City Council award the contract to Mammoth Sports
Construction, LLC in the amount of $5,042,695.
Staff recommends approval.
Executive Session
None.
Adjourn
This Agreement made as of the 22nd day of October 2024 between City of Westminster, South
Carolina (“Owner”), with a principal place of business at 100 E. Windsor Street, Westminster, SC
29693 and Mammoth Sports Construction, LLC (“Contractor”), a Kansas limited liability company
with a principal place of business at 601 E. Wyandotte Street Meriden, Kansas 66512, for the
construction of a new natural grass baseball field and gravel parking lot to be known as the
Westminster Sports Complex as further described herein (“the Project”).
Article 1. Date of Commencement and Substantial Completion
1.1. Contractor shall commence Work on a date that is reasonable and practical based upon
the availability of Owner’s facilities and the delivery of materials necessary to complete
such Work. It is anticipated that all Work under this Agreement will be completed as soon
as reasonably possible following commencement of the Work , subject to any changes
occurring under the terms and conditions of this Agreement.
1.2. If the Contractor is delayed at any time in the commencement or progress of the Contract
Work by any cause beyond the control of the Contractor, the Contractor shall be entitled
to an equitable extension of time to complete the Work. Examples of causes beyond the
control of the Contractor include, but are not limited to, the following: (a) acts or
omissions of Owner, Design Professionals or Others; (b) Changes in the Work or the
sequencing of the Work ordered by Owner, or arising from decisions of Owner that impact
the time of performance of the work; (c) delay authorized by Owner pending dispute
resolution or suspension by Owner; (d) delay in receiving authority and/or approval from
governmental agencies necessary for the Project, including permitting; (e) transportation
delays not reasonably foreseeable; ( f) unavoidable accidents or circumstances; (g)
adverse weather conditions, and (h) force majeure events.
Article 2. General Provisions
2.1. The Parties hereby agree and stipulate that the transaction described in this Agreement
is an Equalis Group Cooperative Project. Therefore, the following document is
incorporated into this Agreement and made a part hereof as if more fully set forth herein;
Mammoth Sports Construction & Equalis Group Publicly Procured Master Agreement
Contract #COG-2138A. In the event of a conflict between this Agreement and that Master
Agreement Contract, this Agreement will prevail.
2.2. This Agreement may be amended only by written instrument signed by both the Owner
and Contractor. In the event of conflict in the terms and conditions contained in the
Contract Documents, this Agreement shall take precedence over terms and conditions
contained in any other contract documents for the Work.
2.3. The term “Contract Documents” means this Agreement, including the attached Exhibit A
Scope of the Work & Clarification s, and any other documents incorporated into this
Agreement by further written agreement of Owner and Contractor.
2.4. The term “Work” means all construction services required by, intended by, and included
in the Agreement, whether completed or partially completed, and includes all other labor,
materials, equipment, parts, supplies, skills, supervision, transportation, ser vices, and
other facilities and things necessary, proper, or incidental for the Contractor to carry out
and complete its obligations under the terms of the Agreement. The Scope of Work for
the Contractor is set forth in Section 6 . For the purposes of thi s Agreement, Site
Excavation shall mean the removal of all materials necessary for Base Construction to
commence on the Project. For the purposes of this Agreement, Base Construction shall
mean work necessary for earth excavation, placement of aggregate an d/or drainage
systems to prepare the worksite for installation of synthetic turf and/or natural turf.
Article 3. Owner
3.1. If requested by the Contractor, the Owner shall furnish all necessary surveys and a legal
description of the site.
3.2. If the Contractor fails to correct Work which is not in accordance with the Agreement, the
Owner may direct the Contractor, in writing, to stop the Work until the correction is
made.
3.3. If the Contractor fails to carry out the Work in accordance with this Agreement and after
a seven (7) business day period from receipt of written notice from Owner to commence
and continue correction of such failure with diligence and promptness, the Owner may,
without prejudice to the other remedies, correct such deficiencies. In such case, the
Contract Sum shall be adjusted to deduct the cost of correction from payments due to
the Contractor.
Article 4. Contractor
4.1. Execution of the Agreement by the Contractor is a representation that the Contractor has
visited the site, become familiar with local conditions under which the Work is to be
performed and correlated personal observations with requirements of the Contract
Documents.
4.2. Before commencing activities, the Contractor shall:
(1) Take field measurements and verify field conditions;
(2) Compare such measurements and field conditions and other information
known to the Contractor; and
(3) Promptly report errors, inconsistencies or omissions discovered to the Owner.
4.3. The Contractors shall provide and pay for labor, materials, equipment, tools,
transportation and other facilities and services necessary for proper execution and
completion of the Work.
4.4. The Contractor shall perform the Work in accordance with the Contract Documents in a
good and workmanlike manner and in an expeditious and economical manner consistent
with the interest of the Owner; shall exercise the best degree of care, skill, and dilig ence
in the performance of the Work and in accordance with and consistent with industry
standards for similar projects; shall utilize its best skill, effort, and judgment in diligently
performing the Work. Workmanship shall be of a quality to produce satisfactory results.
This shall include, but not be limited to meaning, that all materials shall be installed in a
true and straight alignment, level and plumb; patterns shall be uniform, and joining of
materials shall be flush and level, unless otherwise directed by the Owner or the Contract
Documents. The Contractor warrants and represents that it has adequate resources to
carry out the Work in a timely manner and as contemplated by the Contract Documents.
The Contractor shall be solely responsible for and have control over construction means,
methods, techniques, sequences, and procedures, and for coordinating all portions of the
Work.
4.5. The Contractor shall enforce strict discipline and good order among Contractor’s
employees, the employees of any approved subcontractor, and any other persons
carrying out the Work. The Contractor shall not permit employment of unfit persons or
persons not skilled in tasks assigned to them.
4.6. The Contractor warrants to the Owner that (1) materials and equipment will be of new
and good quality; (2) the Work will be free from defects not inherent in the quality
required or permitted; and (3) the Work will conform to the requirements of the
Agreement.
4.7. The Contractor shall confine operations at the site to areas permitted by the Owner and
ensure best efforts to protect property of the Owner adjacent to the Project.
4.8. The Contractor shall keep the premises and surrounding area free from accumulation of
debris and trash related to the Work. At the completion of the Work, the Contractor shall
remove its tools, construction equipment, machinery, surplus material, and shal l
promptly dispose of waste materials.
4.9. The Contractor shall provide and pay for labor, materials, equipment, tools, utilities
transportation, and other facilities and services necessary for proper execution and
completion of the Work. The Contract Sum includes the cost for all of the above and
foregoing, unless otherwise specified in the Contract Documents.
4.10. The Contract Sum within this Agreement is based upon the pricing of fuel (gasoline and/or
diesel) and materials required for the Project, as of the date of Contractor’s proposal to
Owner for construction of the Project. In the event such fuel or material prices increase
by fifty percent (50.0%) or more during the Project, the Contractor reserves the right to
charge Owner additional fuel and/or material costs based on the tender price by
Contractor’s supplier, or alternatively Owner and Contractor may agree to deduct any
such additional costs from Owner’s construction contingency for the Project.
4.11. The Contractor will abide by all applicable policies, rules, and regulations of the Owner
with respect to conduct, including smoking, access to the Project, parking of vehicles, tree
preservation, and entry to any adjacent facilities that are owned by the Owner.
4.12. Without prior approval of the Owner, the Contractor shall not permit any workers to use
any existing facilities at the Project, including, without limitations, lavatories, toilets,
entrance, and parking areas other than those designated by the Owner. With out
limitation of any other provision of the Contract Documents, the Contractor shall use its
best efforts to comply with all rules, regulations promulgated by the Owner in connection
with the use and occupancy of the Project and the building, policies, an d procedures, as
amended from time to time.
4.13. The Contractor shall pay sales, consumer, use and similar taxes that are legally required.
If the Project is exempt from certain local and/or state sales and use taxes, the Owner
shall provide to Contractor a Sales Tax -Exempt Certificate. The Contractor sh all take all
appropriate action to obtain such exemptions or refunds of taxes paid and shall not
charge the Owner for any such taxes. The Contractor shall pay all applicable sales and
use taxes required to be paid in performing the Work, and such payments shall be
included in the Costs of the Work. The Contractor shall furnish such data as may be
necessary to enable the Owner to obtain any refunds of such taxes that may be available
under the laws, ordinances, rules or regulations applicable to such taxes. The Cont ractor
shall require each of its Subcontractors comply with the preceding tax requirements and
to maintain such records and furnish Contractor with such data as may be necessary to
obtain refunds to the taxes paid by such subcontractors. The Contractor sh all comply
with all laws applicable to the Work and in connections with this Agreement and shall
comply with and give notice required by agencies having jurisdiction over the Work. If
the Contractor performs Work knowing it to be contrary to applicable la ws, statutes,
ordinances, codes, rules and regulations, or lawful orders of public authorities, the
Contractor shall assume full responsibility for such Work and shall bear the attributable
costs.
4.14. The Contractor shall confine operations at the site to areas permitted by law, ordinances,
permits, and the Contract Documents. Contractor shall schedule and perform the Work
in a manner that does not compromise the safety to the students, customers, and visitors,
and does not unreasonably disrupt or interfere with the continuing normal routine of the
Owner.
4.15. Contractor shall be responsible and accountable for occupational health, safety and
environmental matters related to the performance of the Work including but not limited
to, (i) safety of Contractor’s Personnel, Subcontractor’s Personnel, invitees, and any other
person and all property affected by the performance of the Work, and (ii) the provision
of measures to prevent contamination of the environment whether air, ground, water,
flora or fauna, as a result of the performance of the Work. Contractor shall monitor and
make reasonable efforts to ensure that all hazardous chemicals, materials, wastes or
goods utilized or created in the performance of the Work, are transported, stored used
or disposed of in accordance with good industry and environmental pract ice and all
applicable laws.
4.16. The Contractor is responsible for compliance with the requirements of the Contract
Documents regarding hazardous materials or substances. If the Contractor encounters a
hazardous material or substance not addressed in the Contract Documents, and if
reasonable precautions will be inadequate to prevent foreseeable bodily injury or death
to persons resulting from a material or substance, including but not limited to asbestos
or polychlorinated biphenyl (PCB), encountered on the site by the Contractor, the
Contractor shall, upon recognizing the condition, immediately stop Work in the affected
area and notify the Owner and Architect of the condition. When the material or substance
has been rendered harmless, Work in the affected area shall resume upon written
agreement of the Owner and Contractor. By Change Order, the Contract Time shall be
extended appropriately, and the Contract Sum shall be increased in the amount of the
Contractor’s reasonable additional costs of shutdown, delay, and start-up.
4.17. To the fullest extent permitted by law, the Owner shall indemnify , defend and hold
harmless the Contractor, Subcontractors, Architect, Architect’s consultants, and agents
and employees of any of them from and against claims, damages, losses, and expenses,
including but not limited to attorneys’ fees, arising out of or resulting from performance
of the Work in the affected area, if in fact, the material or substance presents the risk of
bodily injury or death as described in Section 4.1 6 and has not been rendered harmless,
provided that such claim, damage, loss or expense is attributable to bodily injury,
sickness, disease or death, or to injury to or destruction of tangible property (other than
the Work itself), except to the extent that such damage, loss, or expense is due to the
intentional acts or gross negligence of the party seeking indemnity.
4.18. If, without gross negligence on the part of the Contractor, the Contractor is required to
take action either before, during or after the Project, and/or held liable , by a
governmental agency for the identification, testing, remediation, abatement, mitigation,
removal or relocation of hazardous material(s) or substance(s) which exist upon or within
Owner’s property, or result from Contractor performing the Work as required by the
Contract Documents, the Owner shall reimbursed to the Contractor all cost and expense
thereby incurred by the Contractor to complete such action, and any such cost and
expense shall be paid in addition to the Contract Sum stated in Article 6.
4.19. To the fullest extent permitted by law, the Contractor assumes liability for, and agrees to
defend, indemnify, protect, and hold harmless the Owner, its Successors, Assigns,
Affiliates, Trustees, Officers, Contractors, Employees, and Agents (All of the pri or parties
individually and collectively, the “Owner’s related parties”), from and against, all
liabilities, obligations, fines, demands, judgments, losses, damages, penalties, claims,
actions, suits, costs, expenses, and disbursements (including court cos ts and reasonable
attorneys’ fees) of every kind or character (A) arising from any breach, violation or non -
performance of any term, provision, covenant, agreement, or condition of this the
Contract Documents; (B) recovered from or asserted against any of the Owner’s related
parties on account of injury or damage to person or property to the extent that any such
damage or injury may be incident to, arise out of or be caused, either approximately or
remotely, wholly or in parts, by any act, omission, neglige nce or misconduct on the part
of the Contractor or any of its agents, servants, employees, contractors, or invitees or of
any other person while on the Owner’s property under or with the express or implied
invitation or permission of the Contractor; (C) suffered by, recovered from or asserted
against any of the Owner’s related parties by the contractor’s employees, agents,
servants, contractors or invitees. Such indemnification of any of the Owner’s related
parties by the Contractor shall be effective unless such damage results from the
negligence or misconduct of the Owner or any of its duly authorized agents or employees.
This indemnification requirement survives expiration or earlier termination of this
Agreement and the Contract Documents.
4.20. To the fullest extent permitted by law, the Contractor and Owner shall indemnify, defend,
and protect each other and any related parties from any claims involving infringements
or patents and/or copyrights. Nothing contained in this Agreement, or any Contract
Document shall constitute a waiver of or operate to waive or abrogate any immunities to
which the owner is entitled by law.
Article 5. Changes in the Work
5.1. The Owner may order changes in the Work consisting of additions, substitutions,
deletions, or other revisions. The Contractor Sum and applicable time periods to
complete the Work shall be adjusted accordingly in writing, as a result of any such Change
Orders. Such orders shall be in writing and shall be binding on the Owner and the
Contractor. The Contractor shall carry out such orders promptly.
5.2. Substitutions will be permitted in accordance with the following guidelines:
a. Where a definite material is specified, it is not the intent to discriminate against
any “approved equal” product of another manufacturer. It is the intent to set a
definite standard.
b. Open competition is expected, but in all cases, complete data must be submitted
for comparison and test when required by the Owner.
c. The materials, products and equipment establish a standard of required function,
dimension, appearance, and quality to be met by any proposed substitution.
d. No substitution will be considered prior to receipt of a Change Order unless
written requests for approval have been received by the Owner at least five (5)
days prior to the date for receipt of a Change Order. Such requests shall include
the name of the material or equipment for which it is to be substituted and a
complete description of the proposed substitution including drawings,
performance and test data, and other information necessary for an evaluation.
Information shall be submitted in a format that compares the proposed product
in a direct comparison to the specified product. A statement setting forth changes
in other materials, equipment or other portion of the Work including changes in
the work of other contracts that incorporation of the proposed substitution would
require shall be included. The burden of proof of the merit of the proposed
substitution is upon the proposer. The Owner’s decision of approval/disapproval
of a proposed substitution shall be final.
e. If the Owner approves a proposed substitution prior to receipt of a Change Order,
such approval will be set forth in an Addendum. Bidders shall not rely upon
approvals made in any other manner.
f. No substitutions will be considered after the Agreement is fully executed unless
specifically provided in the Contract Documents.
g. No substitution shall be made unless authorized in writing, by the Owner.
h. If a substitution is approved by Owner, all bidders shall base their proposal on the
material or specialty specified in the request for proposal. Any proposal for
substitution shall be submitted within 10 days after the award of the Contract or
Change Order approving the substitution.
i. Should a substitution be accepted, and should the substitute material prove
defective or otherwise unsatisfactory for the service intended within the guaranty
period, the Contractor shall replace this material or equipment with that which
was originally specified, without cost to the Owner.
5.3. If concealed or unknown physical conditions are encountered at the Project that differ
materially from those presented by Owner or from those conditions ordinarily found to
exist, the Contract Sum and time period to complete the Work shall be subject to
equitable adjustment, as agreed upon in writing by Owner and Contractor.
5.4. Acceptance of a Change Order by the Contractor shall constitute full accord and
satisfaction for any and all claims, whether direct or indirect, including but not limited to,
impact or delay damages, arising from the subject matter of the Change Order, or
attorney’s fees and costs arising from a dispute with a Subcontractor over the Change
Order.
Article 6. Contract Sum
6.1. The Contract Sum stated below is the total amount payable by the Owner to the
Contractor for performance of the Work.
The Total Contract Sum will be based on the Base Price plus the Alternates that Owner
selects below: (Owner should place a check mark next to each alternate being selected).
Scope: Site prep and construction of one new natural grass baseball field and gravel parking
a. Site preparation:
a. Includes site clearing and grubbing per plan.
b. Mass excavation and final grading of site.
c. +/- 10 acres seeding.
d. 980 Square feet of retaining walls per plan.
e. 140 linear feet of 32” tall guard railing.
f. Storm drainage and piping.
b. +/- 139,500 sf natural grass baseball fields:
a. +/- 10,276 sf site concrete per plan.
b. (6) ea. 3 row x 27’ long aluminum bleachers per field.
c. (68) ea. 5’ x 10’ portable fence.
d. (2) ea. Scoreboards 16 x 5.
e. (6) ea. Shade structures 27 x 20 x 9.
f. (6) ea. Game Shade Dugouts 8 x 32.
g. (6) ea. Aluminum Dugout Bench’s 21’ long.
h. 300 linear feet of pole-to-pole back stop netting with integrated wall and pad.
i. (1) Set permanent 30 ‘ tall foul poles.
j. (2) Set of Velcro 20 ‘ tall foul poles.
k. (3) ea. 10” portable pitching mounds
l. (6) ea. 6” portable pitching mounds
m. (6) ea. Sports lighting.
n. Sod, Warning track mix, infield mix and outfield irrigation.
i. +/- 10,618 square yards of sod.
ii. 4” thick infield and warning track mix .
o. 1,040 linear feet of 6’ black vinyl chain link fence and gates.
p. 570 linear feet of 8’ black vinyl chain link fence .
q. (1) ea. Double chain link gate
r. (7) ea. single black vinyl chain link gates.
s. 812 linear feet of windscreen.
t. FFE allowance of $129,000 is included.
c. Gravel Parking lot
a. Grade and compact +/- 31,965 square feet of base stone.
b. Bollards, signs and parking blocks per plan
BASE PRICE: $5,042,695
ALTERNATES:
Deduct: $159,985 to use 20’ tall chain link fence in lieu of pole to pole backstop
netting.
Based on the selections above, Owner agrees to pay Contractor a Contract Sum in the
total amount of $ . (Base Price plus Alternates Selected at Contract
Execution)
6.2. In the event Alternates are not selected at the time of Contract execution, the Owner
shall have twenty (20) calendar days from Contract execution to advise Contractor, in
writing, of their selection of any Alternates to be added to the Contract Sum via ch ange
order.
6.3. The Contract Sum shall include all items and services identified in the Scope of Work, and
any other items and services necessary for the proper execution and completion of the
Work, subject to any Change Order of Owner or as further agreed by Owner and
Contractor in writing.
Article 7. Payment
7.1. Based on the Contractor’s Application for Payment, the Owner shall pay the Contractor
as follows:
• 20% of the Contract Sum amount due within ten (10) business days of complete
execution of this Agreement.
• Based on the Contractor’s Application for Payment, the Owner shall pay the
remaining Contract Sum to Contractor as follows:
Contractor shall periodically submit Applications for Payments for Work
performed to Owner on the Project, but no more than one Application for
Payment may be submitted within any thirty (30) day period. Owner shall have
thirty (30) calendar days upon receipt of said Applications for Payment to make
payment accordingly.
The Contractor shall submit to the Owner an itemized Application for Payment for
Work completed in accordance with the Contract Sum stated in this Agreement.
The Application is subject to Owner’s approval and shall be supported by data
substantiating the C ontractor’s right to payment as the Owner may reasonably
require, such as evidence of payments made to, and waivers of liens from,
subcontractors and suppliers. Payments shall be made on account of materials
and equipment delivered and suitably stored at t he site for subsequent
incorporation in the Work. If approved in advance by the Owner, payment may
similarly be made for materials and equipment stored, and protected from
damage, off the site at a location agreed upon in writing.
7.2. The Contractor warrants that a clean title to all Work covered by an Application for
Payment will pass to the Owner no later than the time of payment of that specific
Application for Payment. All Applications for Payment will include Lien Waivers, either
partial or final based on the Application for Payment.
7.3. Payments received from the Owner shall be free and clear of liens, claims, security
interests or other encumbrances adverse to the Owner’s interest. Contractor shall
indemnify and hold Owner harmless from any liens, claims, security interest, or
encumbrance filed by the Contractor, subcontractors, or anyone claiming by, through or
under the Contractor or Subcontractor for items covered by payments made by the
Owner to Contractor.
7.4. The Contractor shall pay each subcontractor and/or supplier in an amount determined in
accordance with the terms of the applicable subcontracts and purchase orders.
7.5. The Owner shall have no responsibility for payments to a subcontractor or supplier.
7.6. If any amounts due by Owner to Contractor remain unpaid after 30 days of Owner’s
receipt of Contractor’s invoice or payment application, such unpaid amounts shall bear
interest from the due date until paid at a rate equal to 1.5% per month or the maximum
allowed by law.
Article 8. Insurance
The Contractor Shall provide and maintain the following insurance coverage for all Work
performed under this Agreement.
Commercial General Liability
• $1,000,000 per event
• $2,000,000 annual aggregate
Commercial Auto
• Combined Single Limit $1,000,000
Workers Compensation
• Statutory Limits
• Employers Liability Limits of $1,000,000
Umbrella Liability
• $5,000,000 per event
• $5,000,000 annual aggregate
Professional & Pollution Liability
• $5,000,000 per event
• $5,000,000 annual aggregate
8.1 The Contractor shall obtain an endorsement to its general liability insurance policy to
cover the Contractor’s obligations under this Agreement. The Contractor shall provide
certificate of insurance showing their respective coverages prior to commencement of
the Work with the Owner and Owner’s related parties listed as additional insured.
8.2 Contractor is required to obtain Certificates of Insurance with same requirements from
Subcontractors and provide to the Owner.
8.3 Certificates of insurance acceptable to the Owner shall be filed with the Owner prior to
commencement of the Work and thereafter upon renewal or replacement of each
required policy of insurance. These certificates and the insurance policies required by this
Article 8 shall contain a provision that coverages afforded under the policies will not be
canceled or allowed to expire until at least 30 days prior written notice has been given to
the Owner. An additional certificate evidencing continuation of liabi lity coverage,
including coverage for completed operations, shall be submitted with the final Application
for Payment as required by Section 9.2 and thereafter upon renewal or replacement of
such coverage until the expiration of the time required.
Article 9. Substantial Completion
9.1. Substantial Completion is the state in the progress of the Work when the Work or
designated portion thereof is sufficiently complete so the Owner can occupy and/or
utilize the Work for its intended use.
9.2. The Work as set out herein will not be considered Substantially Complete unless and until
the performance of the Work is to the point where (1) all Project components included in
the Scope of Work are installed properly and are operational; (2) as to such Work, all
required governmental inspections and certification required for the Work and of
Contractor have been made and posted; (3) as to such work, all the required finishes
included in the Scope of Work, if any, are in place; (4) the Work can be used by the Owner
for its intended purpose; (5) a final completion list has been prepared by Contractor and
approved by Owner; and (6) applicable lien waivers and guarantees for Work com pleted
to that date have been delivered to Owner.
9.3. When the Contractor deems that the Work or designated portion thereof is Substantially
Complete, the Owner will inspect to determine whether the work is Substantially
Complete. Upon approval by the Owner, the Contractor shall prepare a Certificate of
Substantial Completion that shall establish the date of Substantial Completion, shall
establish the responsibilities of the Owner and the Contractor, and shall fix the time
within which the Contractor shall finish all items on the list accompanying the Certificate.
Any warranties, if applicable, shall commence on the date of Substantial Completion of
the Work or designed portion thereof unless otherwise provided in the Certificate of
Substantial Completion.
Article 10. Termination
10.1. Termination by the Contractor. Contractor may declare default and terminate the
Agreement if Owner has not made payment of sums due on an approved Application for
Payment, or otherwise breaches any provision of the Contract Documents , within seven
(7) business days of Owner’s receipt of a written demand from Contractor for such
payment. In the event of default by Owner, the Contractor may terminate the Agreement
and recover from the Owner payment for Work executed and for actual proven
unrecoverable loss with respect to materials, equipment, tools, construction equipment
and machinery purchased prior to the time the event of default by Owner. The results of
termination under this Article 10 are in addition to any other rights and remedies available
to the Contract whether provided in the Agreement or as a matter of equity or law.
10.2. Termination by the Owner. Subject to the Owner providing detailed and written notice of
an alleged fault and providing Contractor fifteen (15) business days to reasonably cure
any such alleged default, the Owner may terminate the Agreement if the Contractor:
a) Repeatedly refuses or fails to supply enough properly skilled workers or proper
materials;
b) Fails to make payment to Subcontractors for materials or labor in accordance with the
respective terms and conditions of the agreements between the Contractor and the
subcontractors;
c) Repeatedly disregards laws, ordinances, or rules, regulations or orders of the Owner
or a public authority having jurisdiction;
d) Repeatedly fails to diligently perform the work or repeatedly fails to correct a defect
or non -conforming work; or otherwise breaches any provision of the Contract
Documents.
10.2.1. Subject to Section 10.2, the Owner, may, without prejudice to any other rights or
remedies of the Owner or Contractor, and after giving the Contractor’s surety, if any, ten
(10) business days advanced written notice to reasonably cure, terminate Contractor and
may take possession of all materials, equipment, tools, appliances, and other items that
have been purchased or provided by payments to the Contractor for the performance of
the Work and may complete the Work. In the event of term ination under this Article
10.2, Contractor shall not be entitled to receive any further payments under the
Agreement. If the costs of finishing the Work exceed the unpaid balance of the Contract
Sum, such excess shall be paid by the Contractor to the Owner. The results of termination
under this Article 10 are in addition to any other rights and remedies available to the
Owner whether provided in the Agreement or by law, including the right to stop Work
under any applicable provision of the Agreement.
Article 11. Miscellaneous Provisions
11.1. The Contractor shall be responsible for initiating, maintaining and supervising all safety
precautions and programs, including those required by law in connection with
performance of the Work. The Contractor shall take reasonable precautions to prevent
damage, injury or loss to employees on the Work, the Work and materials and equipment
to be incorporated therein, and other property at the site or adjacent thereto. The
Contractor shall promptly remedy damage and loss to property caused in whole or part
by the Contractor, or by anyone for whose acts the Contractor may be liable.
11.2. Upon written request of the Owner, i nformation concerning reduction of coverage on
account of revised limits or claims paid under the General Aggregate, or both, shall be
furnished by the Contractor with reasonable promptness.
11.3. The Contractor shall arrange for tests, inspections and approvals of portions of the Work
required by the Agreement or by laws, statutes, ordinances, codes, rules and regulations,
or lawful orders of public authorities, with Contractor and Owner further agreeing herein
how such costs should be paid.
11.4. If default should occur under this Agreement, then each party shall have such rights and
remedies as may be available to it at law and/or in equity. The failure by any party hereto
to exercise or elect, and any delay by such party in exercising or electin g, any right or
remedy hereunder shall not constitute a waiver of any such right or remedy. The exercise
by any party hereto of any right or remedy hereunder shall not preclude the exercise of
any other right or remedy, and the remedies and rights provided herein are cumulative
and not exclusive of any rights or remedies provided at law or in equity.
11.5. To the extent allowed by law, i n the event a dispute should arise from this Agreement,
the prevailing party shall be entitled to attorneys’ fees and all costs of enforcement
and/or litigation against the non-prevailing party.
11.6. The Owner agrees the Contractor shall not be responsible for delay in performance of its
work by reason of acts of war (whether declared or not), armed conflict or the serious
threat of the same (including but not limited to hostile attack, blockade, milit ary
embargo), hostilities, invasion, act of a foreign enemy, extensive military mobilization;
civil war, riot, rebellion, revolution, military or usurped power, insurrection, civil
commotion or disorder, mob violence, act of civil disobedience; act of terrorism, sabotage
or piracy; plague, epidemic, pandemic, outbreaks of infectious disease or any other public
health crisis, including quarantine or other employee restrictions; act of authority
whether lawful or unlawful, compliance with any law or governmen tal order, rule,
regulation or direction, curfew restriction, expropriation, compulsory acquisition, seizure
of works, requisition, nationalization; act of God or natural disaster such as but not limited
to violent storm, cyclone, typhoon, hurricane, torna do, blizzard, earthquake, volcanic
activity, landslide, tidal wave, tsunami, flood, damage or destruction by lightning,
drought; explosion, fire, destruction of machines, equipment, factories and of any kind of
installation, prolonged break-down of transport, telecommunication, or electric current;
general labor disturbance such as but not limited to boycott, strike and lock-out, go-slow,
occupation of factories and premises; shortage or inability to obtain critical material or
supplies to the extent not subject to the reasonable control of the Contractor (“Force
Majeure Event”). In the event of Force Majeure, the Owner agrees that all dates by which
performance of the Contractor’s obligations are scheduled to be met shall be extended,
as reasonable and necessary to complete said obligations or as req uested by the
Contractor, and furthermore that the Contract Sum shall be increased by the amount of
the Contractor’s reasonable costs of suspension, shutdown, work stoppage, delay, re -
mobilization and/or start-up due to any Force Majeure Event. The Owner and Contractor,
in the event of Force Majeure, execute a Change Order, as set forth in the Construction
Agreement, to adjust the Contract Sum, Contract Time and any other cost or expense
because of each Force Majeure Event.
11.7. Consent to Contractor’s Use of Project Information . The Contractor, its subsidiaries
and/or affiliates, may develop and/or capture information, including but not limited to
photographs, videos, and general data, as related to Project, or Contractor’s work on the
Project, for use in Contractor’s business portfolio or as related to Contractor’s marketing
and advertising (“Promotional Work”). The Owner acknowledges and understands that
the Owner’s name, image, likeness, including but not limited to buildings, structures,
fields, logos, signage, as related to the Project, may be ca ptured in such Promotional
Work. The Owner further consents and agrees that the Contractor may use the Owner’s
name, image, likeness, including but not limited to buildings, structures, fields, logos, and
signage, as captured in the Promotional Work in con nection with the Contractor’s
products and services, or the products and services provided by Contractor’s subsidiaries
and affiliates. Such consent and agreement of Owner herein shall apply during the term
of this Agreement and survive thereafter, without limitation, and allow the Contractor,
its subsidiaries and/or affiliates, to continue to use the Promotional Work as developed
and/or captured.
Article 12. Severability of Agreement
12.1 If any term or provision of this Agreement is determined to be illegal, unenforceable, or
invalid in whole or in part for any reason, such illegal, unenforceable, or invalid provisions
or part thereof shall be stricken from this Agreement, and such provisi on shall not affect
the legality, enforceability, or validity of the remainder of this Agreement. If any provision
or part thereof of this Agreement is stricken in accordance with the provisions of this
Article, then this stricken provision shall be replaced, to the extent possible, with a legal,
enforceable, and valid provision that is as similar in tenor to the stricken provision as is
legally possible.
Article 13. Time of the Essence
13.1 Time is of the essence in respect to all provisions of this Agreement that specify a time
for performance; provided, however, that the foregoing shall not be construed to limit or
deprive a party of the benefits of any grace or use period allowed in this Agreement.
Article 14. Survival
14.1 Except as otherwise expressly provided in this Agreement, representations, warranties,
and covenants contained in this Agreement, or in any instrument, certificate, exhibit, or
other writing intended by the parties to be a part of this Agreement, shall survive the date
of this Agreement.
Article 15. Ambiguities
15.1 Each party and its counsel have participated fully in the review and revision of this
Agreement. Any rule of construction to the effect that ambiguities are to be resolved
against the drafting party shall not apply in interpreting this Agreement. The language in
this Agreement shall be interpreted as to its fair meaning and not strictly for or against
any party.
Article 16. Waiver
16.1 No waiver of a breach, failure of any condition, or any right or remedy contained in or
granted by the provisions of this Agreement shall be effective unless it is in writing and
signed by the party waiving the breach, failure, right, or remedy.
Article 17. Headings
17.1 The headings in this Agreement are included for convenience only and shall neither affect
the construction or interpretation of any provision in this Agreement nor affect any of the
rights or obligations of the parties to this Agreement.
Article 18. Counterpart & Electronic Signatures
18.1 This Agreement shall be binding upon and shall inure to the benefit of each of the parties
hereto and to their respective successors and assigns and may be executed in two or more
counterparts each of which shall be deemed an original but all of which toge ther shall
constitute but one and the same instrument. The parties hereto acknowledge and agree
that this Agreement may be executed by electronic signature, which shall be considered
an original signature for all purposes and shall have the same force and effect as an
original signature. Without limitation, “electronic signature” shall include digital versions
of an original signature or electronically scanned and transmitted versions (e.g., via
DocuSign) of an original signature.
Article 19. Representation on Authority of Parties/Signatories
19.1 Each person signing this Agreement represents and warrants that he or she is duly
authorized and has legal capacity to execute and deliver this Agreement. Each party
represents and warrants to the other that the execution and delivery of this Agreement
and the performance of such party’s obligations hereunder have been duly authorized
and that the Agreement is a valid and legal agreement binding on such party and
enforceable in accordance with its terms.
Article 20. Assignment
20.1 Neither party shall voluntarily or by operation of law assign, hypothecate, give, transfer,
mortgage, sublet, license, or otherwise transfer or encumber all or part of its rights,
duties, or other interests in this Agreement or the proceeds thereof (collec tively,
“Assignment”), without the other party’s prior written consent. Any attempt to make an
Assignment in violation of this provision shall be a material default under this Agreement
and any Assignment in violation of this provision shall be null and void.
Article 21. Choice of Law & Dispute Resolution
21.1. All matters arising out of or related to this Agreement shall be subject to, governed by,
and construed according to the laws of the State of South Carolina, and jurisdiction and
venue of any suit arising out of or related to this agreement shall reside only in courts
located in the of State of South Carolina.
21.2. Except for a claim of injunctive relief, and subject to any applicable cure provision, before
Owner or Contractor initiates any court proceeding or enforcement proceeding in
connection with any alleged breach of this Agreement, the Parties shall first part icipate
in a mediation. The mediation shall be attended in person by an officer of each Party with
decision-making authority, counsel for any Party who wishes for his or its counsel to
attend, and a mediator of the American Arbitration Association or other mediator
mutually agreeable to the Parties. The mediation shall take place at a location agreeable
to the Parties, or in the alternative, at a location designated by the mediator. The Parties
shall, in equal shares, pay all costs and expenses of such mediation, and the Parties shall
each pay separately its own counsel fees. The mediation shall take pla ce as soon as
practical, but no later than thirty (30) days after either Party notifies the other, in writing,
that mediation under this provision is requested. The mediation shall be subject to
applicable laws protecting the confidentiality of mediation. In the event the mediator
declares an impasse, the Parties shall proceed in accordance with the provisions of
Section 21.3.
21.3. Subject to first complying with Section 21.2, in the event of any controversy, dispute or
claim arising out of or related to this Agreement, or the interpretation, breach,
termination or validity hereof, including a claim for injunctive relief, a Party sha ll submit
such controversy, dispute or claim to the Circuit Court of Oconee County, South Carolina.
Each of the Parties to this Agreement hereby waives any objection based upon forum non
conveniens, and any objection to venue of any action instituted by o r though this
Agreement in the aforementioned Court and consents to the granting of such legal or
equitable relief as is deemed appropriate by such court.
Article 22. Entire Agreement
22.1 This Agreement, the Contract Documents and all exhibits incorporated, contains the
entire agreement of the parties, and supersedes any and all prior agreements between
the parties, written or oral, with respect to the transactions hereby contemplated. There
are no verbal understandings, agreements, representations, or warranties between the
parties which are not expressly set forth herein. This Agreement may not be changed or
terminated orally but may only be changed by an agreement in writing signed by t he
parties hereto.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be duly executed as of
the day and year first above written.
Owner: Contractor:
City of Westminster, South Carolina Mammoth Sports Construction, LLC
By: _______________________________ By: _________________________________
Printed Name: ______________________ Printed Name: Jacob Farrant, CEO
Date: ______________________________ Date: _______________________________
CITY OF WESTMINSTER, SOUTH CAROLINA
Exhibit A – Scope of the Work & Clarifications
The Scope of Work for the Project shall be as set forth hereafter:
Contract Pricing
a. Site preparation:
a. Includes site clearing and grubbing per plan.
b. Mass excavation and final grading of site.
c. +/- 10 acres seeding.
d. 980 Square feet of retaining walls per plan.
e. 140 linear feet of 32” tall guard railing.
f. Storm drainage and piping.
b. +/- 139,500 sf natural grass baseball fields:
a. +/- 10,276 sf site concrete per plan.
b. (6) ea. 3 row x 27’ long aluminum bleachers per field.
c. (68) ea. 5’ x 10’ portable fence.
d. (2) ea. Scoreboards 16 x 5.
e. (6) ea. Shade structures 27 x 20 x 9.
f. (6) ea. Game Shade Dugouts 8 x 32.
g. (6) ea. Aluminum Dugout Bench’s 21’ long.
h. 300 linear feet of pole-to-pole back stop netting with integrated wall and pad.
i. (1) Set permanent 30’ tall foul poles.
j. (2) Set of Velcro 20’ tall foul poles.
k. (3) ea. 10” portable pitching mounds
l. (6) ea. 6” portable pitching mounds
m. (6) ea. Sports lighting.
n. Sod, Warning track mix, infield mix and outfield irrigation.
i. +/- 10,618 square yards of sod.
ii. 4” thick infield and warning track mix
o. 1,040 linear feet of 6’ black vinyl chain link fence and gates.
p. 570 linear feet of 8’ black vinyl chain link fence.
q. (1) ea. Double chain link gate
r. (7) ea. single black vinyl chain link gates.
s. 812 linear feet of windscreen.
t. FFE allowance of $129,000 is included.
c. Gravel Parking lot
a. Grade and compact +/- 31,965 square feet of base stone.
b. Bollards, signs, and parking blocks per plan.
d. Contract prices are based, and contingent, on execution of Contract within sixty (60)
calendar days from October 15, 2024.
Any cost breakdowns and/or breakouts provided in this document, or separately, are
intended to be utilized for accounting purposes only and not intended to provide “line-item
guarantees”. Budgets included in this contract are not included as line-item allowances,
these budgets are included for use by Mammoth Sports Construction to track the cost of the
work items as required. Individual costs may overrun, underrun, or be used for other items
not specifically outlined as a budget item as required to complete the work.
**Potential costs that may be incurred after/during design investigation:
1. Site Investigation (Utilities relocation, upgrades, or modifications).
2. Governing Jurisdiction or Agency Review, Comments or Requirements (SWPP -
storm water protection plan, erosion control, environmental testing, or
remediation, permitting or other necessary approvals).
3. Owner Directed Changes after Contract Execution.
General Inclusions and Exclusions
1. Sales tax is included.
2. Builders Risk and General Liability insurance is included.
3. Supervision and mobilization are included.
4. Construction permitting is included.
5. Payment, Performance and/or Statutory bonds, and associated fees are excluded. If
requested by Owner, such bonds may be procured with associated fees invoiced directly
to Owner for payment.
6. Survey has been excluded & will be provided by the owner.
a. Additional cost may be incurred if the survey provides a different size of the field
than included in the proposal.
7. Erosion control and maintenance thereof is included.
a. Any water/drainage studies, SWPPP plan, or additional drainage requirements
over and above the listed and typical artificial turf field drainage system are
excluded.
8. All necessary tools, equipment and personal protective equipment are included.
9. Final punch-out and clean-up of the completed project are included.
10. Standard 1-year workmanship warranty is included.
11. The contractor reserves the right to include, pay overtime and acceleration costs within
this contract as required to manage the schedule.
12. Unforeseen subsurface conditions, including burial remains and/or artifacts, and removal
of underground structures, remains or artifacts are excluded.
13. Site Security is excluded.
14. Development fees are excluded.
15. Utility consumption costs for construction activities are excluded.
a. Utilities are to remain under the owner’s name and paid by owner.
16. Construction testing and special inspection expenses not listed above are excluded.
17. Owner shall provide structurally capable ingress/egress for ALL personnel, equipment,
and materials and staging within 50’ of field: typical construction traffic shall be expected
for the duration of this contract. Contractor NOT responsible for damage due to typical
construction traffic ingress/egress to the construction site.
18. Contractor requires a suitable staging area per field. A 25’ x 25’ hard or paved clean
surface area located within 100’ feet of the playing surface shall be provided for purposes
of proper mixing of infill material. Staging area must have a minimum access of 15 feet
wide by 15 feet high. Access to any field will include suitable bridging over curbs from the
staging area to permit suitable access to the field by low clearance vehicles. Staging area
surface shall be suitable for passage with motor vehicles used to tran sport materials to
the site and/or staging area. Contractor shall not be liable for any damages to the staging
area or existing surfaces unless such damages are caused by Contractor’s intentional
misconduct or negligence.
19. Any item or scope of work not specifically listed above or below is excluded.
General Sitework & Preparation
1. Construction of (1) construction entrance is included.
2. Site demolition is excluded unless otherwise noted or shown.
3. Stripping of topsoil and excavation to subgrade are included.
4. Haul-off of excess material is:
a. Excluded. All excavated material will be spread throughout the site.
5. If owner provided utility plans are not available, Mammoth will utilize “Dig Safe” or 811
and private locate utilities. Mammoth will coordinate with owner.
6. Utility infrastructure work or repair is excluded.
a. The supply of or adjustment to manholes, clean-outs, and grates and supply of
the manhole covers is excluded.
7. Any site improvements not specifically addressed or reflected in plans are excluded.
8. Rock Excavation is excluded.
9. Dewatering associated with excavation is excluded.
Natural Turf Field
Natural Turf: Supply and installation of approximately 10,618 square yards of sod is included
with Infield and warning track mix.
1. Site preparation:
a. Includes site clearing and grubbing per plan.
b. Mass excavation and final grading of site.
c. +/- 10 acres of seeding per plan.
d. 980 Square feet of concrete retaining walls per plan
e. 140 Linear feet of 42” tall guard railing
f. Storm drainage and piping per plan.
2. Concrete:
a. +/- 10,276 sf of 4” thick site concrete per plan
3. Athletic Equipment: Supply and install for the following are included.
a. (1) set - 30’ foul poles
b. (2) set - 20’ foul poles Velcro
c. (6) ea. - Game shade Dugouts: 8’WX32’L Dugouts
d. (3) ea. – 10” Portable pitching mound
e. (6) ea. – 6” tall portable pitching mound
f. (3) ea. - Pitching rubber:
g. (3) ea. - Bases:
h. (3) ea. - Home plate:
i. (6) ea. 3 row x 27’ long aluminum bleachers per field
j. (68) ea. 5’ x 10’ portable fence
k. (2) ea. Scoreboards 16 x 5
l. (3) ea. Shade structures 27 x 20 x 9
m. (6) ea. Dugout bench’s 21’ long
n. 300 linear feet of pole-to-pole back stop netting with integrated wall and pad.
o. All athletic equipment not listed above is excluded.
4. Turf Field:
a. Provide & place 4” thick warning track and infield mix.
b. Grade and Compact warning track & infield mix
c. Provide and install +/- 10,618 square yards of sod
d. Provide & install Irrigation for outfield
5. Fencing: is included
a. 1,040 linear feet of 6’ tall chain link fence and gates
b. 570 linear feet of 8’ tall black vinyl chain link fence
c. 812 linear feet of windscreen
6. Sports Lighting is included.
a. (3) 70-foot-tall steel poles
b. (4) 80-foot steel poles
c. (1) 4 Fixture Crossarms
d. (2) 6 Fixture Crossarms
e. (3) 12 Fixture Crossarms
f. (65) LES with visor
g. (1) Wireless Control Hub
h. (65) Prewired poles and crossarms
Westminster Sports Complex
PHASE 01 – COMMITTEE REVIEW
01 – SITE REVIEW
01 – SITE ANALYSIS
01 – SITE OPTIONS
01 – SITE OPTIONS
01 – PROGRAM (OUTDOOR)
Future
01 – SITE ANALYSIS
1
2
1
2
NATURAL GRASS BALLFIELD
• (2) LITTLE LEAGUE FIELDS
• (1) FULL SIZE FIELD (OUTFIELDERS
RUNNING THROUGH DIRT NOT IDEAL)
• GRAVEL PARKING LOT
• CUT GRADE
• RECOMMEND FUTURE ARTIFICIAL TURF
FOR FULL MULTIUSE CAPABILITY
GRASS PRACTICE PITCH
• FILL GRADE
• PROVIDE OPPORTUNITY FOR SOCCER
PRACTICE / OPEN FIELD RECREATION
• FUTURE BALLFIELDS (OR TURF MULTIUSE
FIELD)
• FUTURE EXPANSION OF PARKING
01 – SITE ANALYSIS
1
2
1
1
1 REMOVED RETAINING WALL
• PARKING LOT REDUCED
• RETAINING WALL REMOVED SINCE
PARKING NO LONGER REQUIRED
01 – SITE ANALYSIS
1
2
NATURAL GRASS BALLFIELD
• (2) LITTLE LEAGUE FIELDS
• (1) FULL SIZE FIELD (OUTFIELDERS
RUNNING THROUGH DIRT NOT IDEAL)
• GRAVEL PARKING LOT
• CUT GRADE
• RECOMMEND FUTURE ARTIFICIAL TURF
FOR FULL MULTIUSE CAPABILITY
FUTURE CONCESSION / PAVILION
• GRADED FOR FUTURE CONCESSION BUILDING
2
3 GRAVEL PARKING LOT
4 RETAINING WALL
4
3
5 PRACTICE PITCH / WARMUP AREA
5
Pkg A – Field Review
Multi Use (Super Flex) Fields
▪ (1) Main baseball 400’ field
▪ (2) Secondary baseball 225’ fields
▪ 340’x 210’ Soccer
Pkg A – Field Review
Sports Lighting
FUTURE
Pkg A – Field Review
Scoreboard (2 per field)
Baseball/Softball Scoreboard
Multi Use (Super Flex)
Standard Colors:
Royal
Blue Red Green Navy Maroon Black Gray
Light
Blue
Purple Orange Brown
Pkg A – Field Review
Multi Use (Super Flex) Dugouts (6 per field) - Gameshade
(2) 40’ dugouts with 30’ bench – Main Field
(4) 32’ dugouts with 20’ bench – Secondary Fields
6’ fencing in front
Power – Double gang box on home plate side
Water – Allow for cooler cage
Bat/Helmet/Storage Rack
Player’s Bench
Pkg A – Field Review
Multi Use (Super Flex) Guard Rail (6 per field)
Pkg A – Field Review
Bleachers (3 per field)Multi Use (Super Flex)
Pkg A – Field Review
Pole to Pole Tension Backstop netting System with
Integrated Wall Pad (3 per field)
(1) Main Field – 120’L x 40’H
(2) Secondary Fields – 120’L x 30’H
Multi Use (Super Flex)
Pkg A – Field Review
Foul PolesMulti Use (Super Flex)
10’ Portable foul poles for
secondary (by
owner/operator)
Vinyl foul pole integrated into
backstop netting
Pkg A – Field Review
Multi Use (Super Flex)
4’ Temporary Fence (mesh)
4’ Temporary Fence (chainlink)
Pkg A – Field Review
Wind Screen
500lf of Wind Screen per fields
Multi Use (Super Flex)
Pkg A – Field Review
Bullpens (2 per field)
70'x12' minimum
8’ Fence field side to match
6' on P and C ends
4' down the length
4’ opening to field (5’ to match dugouts?)
Multi Use (Super Flex)
Pkg A – Field Review
Multi Use (Super Flex) – Portable Mounds
Youth Fields MoundMain Fields Mound
Pkg A – Field Review
Pkg B – Building Review
Example Project – beginning of budgeted design
Phase 02
Phase 02 is the new local hub for indoor recreation. Hosting (6) basketball courts, (12) volleyball
courts, gym, pickleball courts and office spaces this facility will serve the entire community.
Future indoor complex
Potential expansion of fields
Phase 01 – outdoor
recreation complex
PHASE 02– INDOOR COMPLEX
PHASE 02– INDOOR COMPLEX
Pitched roof
Extended canopy
Concept (option 2)
The qualities of historic rail depots, like the
one in Westminster, ought to be reflected
to maintain the character of the
community. The project also feeds off the
character of 1930’s era Civilian
Conservation Corps projects. In the spirit
of CCC projects, the character and quality
of the environment will be reflected and
preserved in this project.
Local materials
Emphasized
public spaces
PHASE 02– INDOOR COMPLEX
Test Fits – Live Update
We are currently at the beginning of the test fit part of the five-step process where we have identified a
guiding theme. Now, it’s time to make this facility sing, and we want input from all invested parties to ensure
we are hearing and serving this community fully.
PHASE 02– INDOOR COMPLEX
Other Communities Served
A few examples below illustrate work Mammoth has done for other municipalities and recreation
complexes. We’re just beginning in Westminster. Let’s do something BIG!
Oasis Sports Complex | Marion, IL
Community Projects Youth Indoor Athletics Youth Outdoor Athletics
Solon Community Park | Solon, OH
Jones Youth Park | Lebo, KS World Equestrian Center | Ocala, FL
World Equestrian Center | Ocala, FL Cyclone Ballparks | Pecos, TX
PHASE 02– INDOOR COMPLEX