CITY OF WESTMINSTER SPECIAL CALLED CITY COUNCIL MEETING
April 30, 2024 @ 4:00 PM
Westminster Fire Department
216 Emergency Lane, Westminster
Call to Order
Certification of Quorum
Invocation & Pledge of Allegiance
Public Comments:
The floor is now open for public comments. Citizens of Westminster or others who have registered for time with the Clerk can now address
Council for any matters on tonight’s agenda or other matters you wish to bring before the Council. Speakers are allowed
up to 3 minutes and possibly longer if that Speaker is recognized in advance as representing a larger group with similar concerns. To preserve the
decorum of this public meeting, and to allow adequate time for discussion among the elected membership of City Council, this will be the only
time we will receive unsolicited comments tonight from the public.
Comments from the Mayor and Council
Routine Business
None.
Old Business
None.
New Business
1. Consideration of ORDINANCE NO. 2024-05-14-01; AN ORDINANCE
AUTHORIZING THE CITY OF WESTMINSTER, SOUTH CAROLINA TO ENTER
INTO AN AGREEMENT FOR DESIGN, DEVELOPMENT, AND PRE-
CONSTRUCTION SERVICES; AUTHORIZING THE EXECUTION AND
DELIVERY OF VARIOUS DOCUMENTS RELATING TO SUCH TRANSACTION;
DELEGATING AUTHORITY TO THE CITY ADMINISTRATOR TO EFFECT
SUCH TRANSACTION; AND OTHER MATTERS RELATING THERETO.
In October 2023 at the recommendation of the Recreation Planning Committee and approval
of the City Council the City hired the Sports Facilities Companies (SFC) to conduct (1) a
Market Opportunity Analysis and (2) a Financial Feasibility Analysis. The Recreation
Planning Committee met April 10, 2024 and accepted the two reports. At the meeting the
SFC presented an opportunity for the City to hire Mammoth Sports Construction, LLC
(Mammoth) out of Meriden, Kansas to design and construct the Westminster Recreation
Complex. Mammoth was recommended by SFC due to Mammoth’s expertise in designing
and constructing recreation facilities. Additionally, SFC and Mammoth partner with
recreation product suppliers to provide discounts for their (SFC and Mammoth) clients.
Mammoth presented a draft contract for design, development, and pre-construction services
for the Westminster Recreation Complex.
The proposed ordinance enables the City to hire Mammoth to complete the activities
described above with one caveat - the pre-construction and construction activities need to be
contracted in individual parts - one for design and pre-construction services and the second
for construction services. The Recreation Committee recommends the City contract with
Mammoth for the project. See attached minutes.
Members of Mammoth and SFC will be present at the meeting to make a short presentation
and answer questions the City Council may have.
Staff recommends approval.
FY2025 Budget Workshop
1. Presentation by the City Administrator (the proposed budget will be provided at the workshop)
Proposed Balanced FY 2025 Budget – All Funds
2. Discussion
Executive Session
None.
Adjourn
1
ORDINANCE NO. 2024-05-14-01
AN ORDINANCE AUTHORIZING THE CITY OF WESTMINSTER,
SOUTH CAROLINA TO ENTER INTO AN AGREEMENT FOR DESIGN,
DEVELOPMENT, AND PRE -CONSTRUCTION SERVICES;
AUTHORIZING THE EXECUTION AND DELIVERY OF VARIOUS
DOCUMENTS RELATING TO SUCH TRANSACTION; DELEGATING
AUTHORITY TO THE CITY ADMINISTRATOR TO EFFECT SUCH
TRANSACTION; AND OTHER MATTERS RELATING THERETO.
The City Council of the City of Westminster (the “ City Council”), the governing body of
the City of Westminster, South Carolina (the “City”), has made the following findings of fact:
WHEREAS, the City is a municipal corporation of the State of South Carolina (the
“State”) located in Oconee County, South Carolina, and as such possesses all general powers
granted by the Constitution and statutes of the State to such public entities, which includes the
power to expend public funds for public purposes and is authorized, pursuant to Section 5-7-30 of
the Code of Laws of South Carolina 1976, as amended, to enact ordinances that are “necessary
and proper for the security, general welfare, and convenience of the municipality….”
WHEREAS, the City has limited or inadequate recreation facilities, and the City Council
is committed to developing new recreational improvements within the City, particularly sports
facilities.
WHEREAS, the City and Mammoth Sports Construction, LLC (“ Mammoth”) have
negotiated an AGREEMENT FOR DESIGN, DEVELOPMENT, PRE -CONSTRUCTION, &
CONSTRUCTION SERVICES (the “ Agreement”), the form of which is attached hereto as
Exhibit A, which provides that Mammoth will design, develop and construct a new sports facility
in the City to be known as the Westminster Sports Complex (the “Project”).
WHEREAS, the City Council has further determined that the Project will serve a proper
public and corporate purpose of the City. Further, the Project, when developed is expected (i) to
encourage visitors to visit, explore and promote the City, (ii) allow for community- events and
cross-promotional endeavors with other businesses and City- sponsored functions, (iii) expand
regional and intergovernmental cooperation through sports tourism activities, and (iv) stimulate
new and additional spending with in the City.
WHEREAS, the provisions of S.C. Code Ann. Section 11-35-5320, require that the City ,
as a political subdivision of the State of South Carolina, enact “procedures embodying sound
principles of appropriately competitive procurement,” suitable for the unique needs of the City.
WHEREAS, in keeping with such statutory directive, on October 11, 2022, the City
Council enacted an ordinance entitled, “ AN ORDINANCE DELETING CERTAIN
PROVISIONS OF TITLE III, CHAPTER 35 OF THE CITY OF WESTMINSTER CODE OF
ORDINANCES PERTAINING TO ITS PURCHASING AND CONTRACTING POLICY;
ADDING TITLE III, CHAPTER 38 TITLED “PROCUREMENT” ; AND OTHER MATTERS
RELATED THERETO” the terms of which implemented a revised purchasing and contracting
2
policy for the City (the “Procurement Code ”);
WHEREAS, in accordance with the findings of the South Carolina Court of Appeals in
Glasscock Co., Inc. v. Sumter Cnty ., 361 S.C. 483 (2004 Ct. App.) wherein the court validated a
procurement exception for contracts approved by ordinance, the City has determined to directly
contracting with Mammoth under the terms of the Agreement, and under the terms hereof, the City
Council has determined to authorize and approve the Agreement, and expressly exempts the
Agreement from the procurement thresholds and competitive bidding requirements of the
Procurement Code.
NOW THEREFORE, BE IT ORDAINED, by the Mayor and the City Council members
of the City of Westminster, South Carolina, in a meeting duly assembled, as follows:
Section 1 Recitals
Each finding or statement of fact set forth in the recitals hereto has been carefully examined
and has been found to be in all respects true and correct.
Section 2 Approval of the Agreement
A. The City Council has reviewed the terms of the Agreement, the form of which is
attached to this Ordinance as Exhibit A.
B. The Agreement shall be executed and delivered on behalf of the City by the Mayor
in the form substantially conforming to the draft attached to this Ordinance, but with such non-
material changes as the Mayor, on the advice of legal counsel, determines to be in the best interest
of the City. Following execution, the City Council shall be timely informed of the execution of the
Agreement and informed as to the final terms thereof and such changes from the current draft as
the Mayor determined necessary to carry out the purposes of this Ordinance. The consummation
of the transactions and undertakings described in the Agreement, and such revisions and
undertakings as may be determined by the Mayor , in consultation with legal counsel , to be
necessary or advisable in connection therewith, are hereby approved.
Section 3 Procurement
The City Council has determined that Mammoth has specialized expertise in the area of
sports facility construction and it is in the best interest of the City for the Project to be designed,
developed and constructed by Mammoth as contemplated by the Agreement. To the extent the
award of the Project to Mammoth under the terms of Agreement do not conform to the particular
terms of the Procurement Code, particularly the purchase thresholds, competitive bidding
requirements and any further requirements therein, City Council expressly exempts the Agreement
from the terms of the Procurement Code and public declares that the Agreement shall not be
subject to the provisions of the Procurement Code. To the extent of any conflict between the
Agreement on the one hand and the P rocurement Code on the other, this Ordinance shall control
and constitute the City procurement policies for all purposes hereunder.
1 The authorizations
1 See Glasscock Co., Inc. v. Sumter Cnty. , 361 S.C. at 491, (allowing “local governments needed flexibility to
3
provided herein are explicitly found to embody sound principles of appropriately competitive
procurement and City Council believes that such actions are in the best interest of the City and its
citizens.
Section 4 Other Documents; Ratification of Prior Actions
In connection with the execution and delivery of the Agreement, the Mayor and the City
Administrator, acting together or individually, are additionally authorized to prepare, review,
negotiate, execute, deliver, and agree to such additional agreements, certifications, documents,
closing proofs, and undertakings as he shall deem necessary or advisable. Any actions previously
undertaken by the Mayor, any other members of City Council, the City Administrator, or other
City staff in connection with the execution and delivery of the Agreement prior to the enactment
of this Ordinance are ratified and confirmed.
Section 5 Severability
If any one or more of the provisions this Ordinance should be contrary to law, then such
provision shall be deemed severable from the remaining provisions and shall in no way affect the
validity of the other provisions of this Ordinance.
Section 6 Repealer
Nothing in this Ordinance shall be construed to affect any suit or proceeding pending in
any court, or any rights acquired or liability incurred, or any cause of action acquired or existing,
under any act or ordinance hereby repealed; nor shall any just or legal right or remedy of any
character be lost, impaired or affected by this Ordinance.
Section 7 Inconsistency
All ordinances, resolutions or parts of any ordinances or resolutions inconsistent or in
conflict with the provisions of this Ordinance are hereby repealed to the extent of the conflict or
inconsistency.
Section 8 Effect
This Ordinance shall be enacted and effective upon second reading by the City Council.
[Remainder of Page Intentionally Left Blank]
determine what is ‘appropriately competitive’ in light of the public business they must transact”).
4
DONE AND ORDAINED IN COUNCIL ASSEMBLED, this _____ day of
__________, 2024.
CITY OF WESTMINSTER,
SOUTH CAROLINA
(SEAL) ___________________________
Mayor
Attest:
_________________________
City Clerk
First Reading: _________, 2024
Second Reading: _________, 2024
Approved as to Form:
_________________________
City Attorney
5
EXHIBIT A
FORM OF AGREEMENT
PURSUANT TO SECTION 15-48-10 ET SEQ. OF THE CODE OF LAWS OF SOUTH CAROLINA,
1976, AS AMENDED, THE TERMS AND CONDITIONS OF THIS CONTRACT ARE SUBJECT TO
BINDING ARBITRATION UNDER PARAGRAH 14.1 HEREIN.
AGREEMENT FOR DESIGN, DEVELOPMENT, PRE-CONSTRUCTION, &
CONSTRUCTION SERVICES
This AGREEMENT FOR DESIGN, DEVELOPMENT, PRE-CONSTRUCTION, AND
CONSTRUCTION SERVICES ( this “Agreement”) is made and entered into this _____day of
April 2024 (" Effective Date"), by and between the CITY OF WESTMINSTER, SOUTH
CAROLINA, 100 E. Windsor Street, Westminster, SC 29693 (the “ City”), and MAMMOTH
SPORTS CONSTRUCTION, LLC, and/or its assigns, with a principal place of business at 601
E Wyandotte Street, Meriden, KS 66512 ( “Mammoth”) (each a “ Party” and collectively the
“Parties”).
WHEREAS, the City requests the creation, development , and execution of design,
development, pre-construction, and construction services for a new sports facility in the City to be
known as the Westminster Sports Complex (the “Project”); and
WHEREAS, Mammoth has the requisite expertise and experience to provide such services
to the City, in accordance with the terms and conditions of this Agreement.
NOW, THEREFORE, for the consideration hereinafter set forth, the receipt and sufficiency
of which are hereby acknowledged, the Parties agree as follows:
I. SCOPE OF SERVICES
A. Mammoth shall furnish all services required for the complete and prompt execution
and performance of all duties, obligations, and responsibilities, which are described or reasonably
implied from the Scope of Design, Development & Pre -Construction Services – Westminster
Sports Complex (the “Scope of Design Services”) attached hereto as Exhibit A.
B. Upon completion of the Scope of Design Services, and final approval of design,
development, and pre-construction matters, the City and Mammoth shall may enter into a Scope
of Construction Services – Westminster Sports Complex (the “Scope of Construction Services”
and together with the Scope of Design Services, the “Services”) attached hereto as Exhibit B for
the construction of the Westminster Sports Complex, which the Parties agree shall be then dul y
executed, attached, and incorporated into this Agreement.
C. A change in the Scope of Design Services or the Scope of Construction Services
shall not be effective unless authorized by both Parties as a written amendment to this Agreement.
If Mammoth proceeds without such written authorization, Mammoth shall be deemed to have
waived any claim for additional compensation, including a claim based on the theory of unjust
enrichment, quantum mer uit, or implied contract. Except as expressly provided herein, no agent,
employee, or representative of the City is authorized to modify any term of this Agreement, either
directly or implied by a course of action.
D. The Parties agree that time is of the essence to perform the duties and obligations
contemplated herein. Upon the City’s written notice to proceed, the Mammoth shall commence
the initial Scope of Design Services as contemplated by Exhibit A.
2
II. TERM AND TERMINATION
A. This Agreement shall commence on the Effective Date and shall continue until
Mammoth completes both the Scope of Design Services and the Scope of Construction Services
for the Project to the satisfaction of the City or until terminated as provided herein.
B. Either Party may terminate this Agreement upon 30 calendar days’ advance written
notice. The City shall pay Mammoth for all work previously authorized and completed prior to the
date of termination. If, however, Mammoth or the City has substantially or materially breached
this Agreement, Mammoth or the City shall have any respective remedy or right of set-off available
at law or equity.
III. COMPENSATION
A. In consideration for performance of the Scope of Design Services for the Project by
Mammoth, the City shall pay Mammoth fees and expenses as set forth in Exhibit A attached hereto.
Unless otherwise stated within Exhibit A, or further agreed by the City and Mammoth in writing,
this amount shall include all fees, costs and expenses incurred by Mammoth, and no additional
amounts shall be paid by the City for such fees, costs, and expenses. Mammoth may submit periodic
invoices, based upon work complete, which shall be paid by the City within 30 calendar days of
receipt.
B. In consideration for performance of the Scope of Construction Services for the
Project by Mammoth, the City shall pay Mammoth fees and expenses as to be agreed by the Parties
and incorporated into Exhibit B pursuant to Section I.B. of this Agreement.
C. No payment shall constitute an acceptance of any Services that not in accord with
this Agreement. Further, The City shall have the right at any time to withhold all or part of any
payment to Mammoth for deficient Services that have not been remedied, or for any other breach
of this Agreement.
IV. MAMMOTH’S REPRESENTATIONS
A. Mammoth hereby represents that it is qualified to assume the responsibilities of the
design for the Project and render the services described herein. The work performed by Mammoth
shall be in accordance with generally accepted professional practices and the level of competency
presently maintained by other practicing firms in the same or similar type of work in the applicable
community. The work and services to be performed by Mammoth hereunder shall be done in
compliance with applicable laws, ordinances, rules, and regulations. Mammoth further represents
that it is authorized to perform work in the State of South Carolina, and currently maintains or will
retain (prior to initiating any applicable work) all regulatory approvals, licenses and other
requirements to perform the Project.
B. The City’s review, approval, or acceptance of, or payment for any services shall
not be construed to operate as a waiver of any rights under this Agreement or of any cause of action
arising out of the performance of this Agreement.
3
C. Because the City has hired Mammoth for its expertise, Mammoth agrees not to
employ subcontractors to perform any work under this Agreement except as expressly set forth in
the Scope of Design Services, or as contemplated for the Scope of Construction Services , unless
as otherwise agreed in advance by the City and Mammoth in writing.
V. OWNERSHIP
Any materials, items, and work specified in the Scope of Design Services for Exhibit A,
and which may be the result of work performed under Exhibit B , and any and all related
documentation and materials provided or developed by Mammoth, for the Project shall be
exclusively owned by the City. Mammoth expressly acknowledges and agrees that all work
performed under the Scope of Design Services for Exhibit A, and to the extent applicable Exhibit
B, constitutes "work made for hire." To the extent, if at all, that such services do not constitute
"work made for hire," Mammoth hereby transfers, sells, and assigns to the City all its right, title,
and interest in such work.
The City expressly acknowledges and agrees that the documents and data to be provided
by Mammoth under the Agreement may contain certain design details, features, and concepts from
Mammoth's own practice detail library, which collectively may form portions of the design for the
Project, but which separately, are, and shall remain, the sole and exclusive property of Mammoth.
Nothing herein shall be construed as a limitation on Mammoth's right to reuse such component
design details, features, and concepts on other projects, in other contexts or for other clients.
VI. INDEPENDENT RELATIONSHIP
Notwithstanding any other provision of this Agreement, all personnel assigned by
Mammoth to perform work under the terms of this Agreement shall be, and remain, at all times,
employees and/or agents of Mammoth for all purposes. Mammoth shall not represent that it is an
employee of the City for any purposes of this Agreement.
VII. INSURANCE
A. Mammoth agrees to procure and maintain, at its own cost, a policy or policies of
insurance sufficient to insure against all liability, claims, demands, and other obligations assumed
by Mammoth pursuant to this Agreement. At a minimum, Mammoth shall procure and maintain,
and shall cause any sub-contractor, if applicable, to procure and maintain, the insurance coverages
listed below, with forms and insurers acceptable to the City.
1. Worker's Compensation insurance as required by law.
2. Commercial General Liability insurance with minimum combined single limits of
$1,000,000 each occurrence and $2,000,000 general aggregate. The policy shall be
applicable to all premises and operations and shall include coverage for bodily
injury, broad form property damage, personal injury (including coverage for
contractual and employee acts), blanket contractual, products, and completed
operations. The policy shall contain a severability of interest provision, and shall
include the City and the City's officers, employees, and Mammoth as additional
insureds. No additional insured endorsement shall contain any exclusion for bodily
injury or property damage arising from completed operations.
3. Professional liability insurance with minimum limits of $1,000,000 each claim and
$2,000,000 general aggregate.
B. Such insurance shall be in addition to any other insurance requirements imposed by
law. The coverages afforded under the policies shall not be canceled, terminated, or materially
changed without at least 30 days prior written notice to the City. In the case of any claims -made
policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain
such continuous coverage. Any insurance carried by the City, its officers, its employees , or
Mammoth as its consultant shall be excess and not contributory insurance to that provided by
Mammoth. Mammoth shall be solely responsible for any deductible losses under any policy.
C. Upon request, Mammoth shall provide the City with one or more certificate(s) of
insurance as evidence that all required policies are in full force and effect.
D. To t he extent required by law, or otherwise agreed by the Parties, Mammoth shall
procure, increase and/or maintain, at its own cost, additional insurance coverages as necessary for
the Scope of Construction Services provided to the City under Exhibit B.
VIII. INDEMNIFICATION
A. Mammoth agrees to indemnify and hold harmless the City and its officers, insurers,
volunteers, representatives, agents, employees, heirs, and assigns from and against all claims, liability,
damages, losses, expenses , and demands, including attorney fees, on account of injury, loss, or
damage, including without limitation claims arising from bodily injury, personal injury, sickness,
disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out
of or are in any manner connected with this Agreement if such injury, loss, or damage is caused in
whole or in part by, the act, omission, error, professional error, mistake, negligence, or other fault of
Mammoth, or any officer, employee, representative, or agent of Mammoth, or which arise out of a
worker's compensation claim of any employee of Mammoth. Mammoth's liability under this
indemnification provision shall be to the fullest extent of, but shall not exceed, that amount
represented by the degree or percentage of negligence or fault attributable to Mammoth, any sub-
contractor of Mammoth, or any officer, employee, representative, or agent of Mammoth or of any
subcontractor of Mammoth.
B. Mammoth agrees to indemnify, defend and hold harmless the City, its respective
affiliates, subsidiaries, successors, assigns, officers, directors, employees, and agents, from and
against any and all liabilities, losses, expenses and claims, fines, and penalties imposed by any
governmental authority which arise from or result from Mammoth violation of any applicable law,
regulations or other enforcement actions associated with the Project.
C. In the event that Mammoth or other person who has performed any portion of the
Services files, claims or asserts any lien or claim for payment upon the Project or against City,
Mammoth shall indemnify, defend and hold City harmless from any against any such claims, losses
or expenses (including attorney’s fees and costs) incurred in connection with any such claim.
IX. MISCELLANEOUS
A. Consultants. The City hereby approves Mammoth to engage consultants, as
Mammoth deems necessary, for the completion of the work required under this Agreement;
namely The Sports Facilities Companies (“ SFC”), located at 17755 US Hwy. 19 N., Suite 300,
Clearwater, FL 33764. Mammoth shall pay any fees or expenses related to the engagement of such
consultants, including SFC, unless otherwise agreed by the Parties, in writing.
B. Choice of Law and Dispute Resolution.
1. All matters arising out of or related to this Agreement shall be subject to, governed
by, and construed according to the laws of the State of South Carolina , and
jurisdiction and venue of any suit arising out of or related to this agreement shall
reside only in courts located in the State of South Carolina.
2. Except for a claim of injunctive relief, and subject to any applicable cure provision,
before a Party initiates any court proceeding or enforcement proceeding in
connection with any alleged breach of this Agreement, the Parties shall first
participate in a mediation. The mediation shall be attended in person by an officer
of each Party with decision-making authority, counsel for any Party who wishes for
his or its counsel to attend, and a mediator of the American Arbitration Association
or other mediator mutually agreeable to the Parties. The mediation shall take place
at a location agreeable to the Parties, or in the alternative, at a location designated
by the mediator. The Parties shall, in equal shares, pay all costs and expenses of
such mediation, and the Parties shall each pay separately its own counsel fees. The
mediation shall take place as soon as practical, but no later than thirty (30) calendar
days after either Party notifies the other, in writing, that mediation under this
provision is requested. The mediation shall be subject to applicable laws protecting
the confidentiality of mediation. In the event the mediator declares an impasse, the
Parties shall proceed in accordance with the provisions of subsection 3 below.
3. Subject to first complying with Section IX. B.2., in the event of any controversy,
dispute or claim arising out of or related to this Agreement, or the interpretation,
breach, termination or validity hereof, including a claim for injunctive relief, a Party
shall submit such controversy, dispute, or claim to the United States District Court
for the District of South Carolina . Each of the Parties to this Agreement hereby
waives any objection based upon forum non conveniens, and any objection to venue
of any action instituted by or though this Agreement in the aforementioned Court
and consents to the granting of such legal or equitable relief as is deemed
appropriate by such Court.
C. N
o Waiver . Delays in enforcement or the waiver of any one or more defaults or
breaches of this Agreement by the City shall not constitute a waiver of any of the other terms or
obligations of this Agreement.
D. Third P
arties. There are no intended third-party beneficiaries to this Agreement.
E. Notice. Any notice under this Agreement shall be in writing and shall be deemed
sufficient when directly presented or sent pre -paid, first-class United States Mail to the Party at
the address set forth on the first page of this Agreement.
F. Severability. If any provision of this Agreement is found by a court of competent
jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall
remain in full force and effect.
G. Modification. T his Agreement may only be modified upon written agreement of the
Parties.
H. Assignment. U nless stated otherwise herein, neither this Agreement nor any of the
rights or obligations of the Parties shall be assigned by either Party without the written consent of
the other.
I. Representative Authority. Each person signing this Agreement represents and
warrants that he or she is duly authorized and has the legal capacity to execute the Agreement.
I. Integration. T his Agreement, to the extent applicable by law, hereby incorporates
the Exhibit A for Scope of Design Services and Exhibit B for Scope of Construction Services and
constitutes the entire Agreement between the Parties, superseding all prior oral or written
communications, as to the nature of the work identified herein.
IN WITNESS WHEREOF, the Parties have executed this Agreement as of the Effective Date.
CITY OF WESTMINSTER, SOUTH CAROLINA
By:
MAMMOTH SPORTS CONSTRUCTION, LLC
By:
Jacob Farrant, CEO
EXHIBIT A
SCOPE OF DESIGN, DEVELOPMENT & PRE-CONSTRUCTION SERVICES
WESTMINSTER SPORTS COMPLEX
This Exhibit A is incorporated into the accompanying AGREEMENT FOR DESIGN, DEVELOPMENT,
PRE- CONSTRUCTION, AND CONSTRUCTION SERVICES dated the _____day of _____2024 (the
“Agreement”). Terms using initial capitals herein and not otherwise defined shall have the meanings
ascribed thereto in the Agreement.
BETWEEN the City:
and Mammoth:
for the following Project:
Westminster Sports Complex in Westminster, South Carolina
T
he City and Mammoth agree as follows:
Westminster Spo
rts Complex Design-Build Scope of Work
• Mammoth to develop overall conceptual design of sports facility, accessory buildings,
related amenities, with Mammoth leading the development of submittals. Mammoth to lead
design-build development of construction documents for construction.
• SFC, as an authorized consultant, will provide pro forma s, one or more economic impact
studys, and certain associated presentation materials.
Phase 1- Concept Design/Market & Financial Analysis
• Mammoth will provide conceptual plans and renderings, cost estimates and design
construction schedules associated with Project for the City . The components of these
conceptual design services will take into consideration remodeling of existing spaces/areas,
future building additions, current constructability of existing and/or new spaces,
landscaping, and sustainability needs all within the context of the City’s anticipated
standards.
• SFC to provide the City market-financial forecast-impact analysis, as related to the Project,
including:
Areas of focus and deliverable to include:
City of Westminster, South Carolina 100 E.
Windsor Street
PO Box 399
Westminster, SC 29693
Mammoth Sports Construction, LLC 601 E
Wyandotte St
Meriden, KS 66512
1. Verification of facility programmatic needs for sports field number and sizes, and
additional site amenities, anticipating the following at a minimum:
a. Mixture of sports fields and amenities to align with market and area needs.
b. Accessory structures as needed to support sports activities.
2. Develop concept for site development anticipating drainage and utility connection.
3. Coordinate required parking and vehicle access with existing adjacent development.
4. Identify local building code and operational needs.
5. Develop conceptual imagery, preliminary project costs and construction schedule.
6. Provide final document for City use in community and stakeholder engagement.
In order to develop the conceptual design for the Project, Mammoth will utilize the following
design steps:
1. Visioning and goals.
2. Data gathering/user meetings.
3. Program verification.
4. Test concepts with the City.
5. Final deliverable.
Phase 2- Construction D ocuments/Permitting
• Scope and Fee of Phase to be determined between the City and Mammoth from results of Phase 1.
• Documentation and construction/permit set to coincide with related City-required submittals.
Scope to include:
1. Design development
a. Beginning from the completed “Phase 1 – Conceptual Design”, further refine
design for construction and final alignment with project budget and timeline.
b. Mammoth anticipates utilizing an expedited design and construction process
utilizing multiple bid packages to allow early construction procurement and
mobilization.
c. Design development will include further development of following aspects:
i. Operational compatibility, safety, and security.
ii. Material palette.
iii. Accessibility.
iv. Code compliance and coordination with local authorities having jurisdiction.
v. Alignment with budget and construction timeline.
d. Hold regular design coordination meetings with Mammoth and the City.
e. Develop site plans, building plans, equipment layouts, elevations, and site imagery.
f. Coordinate engineering needs including civil, mechanical, electrical and
plumbing design.
g. Update Project schedule and opinion of probable Project cost throughout process.
2. Bid Package 1 – Site grading, infrastructure, turf, and long-lead items
a. Develop Bid Package incorporating site grading, infrastructure improvements,
turf assembly and long-lead items anticipated to include:
i. Site plan.
ii. Grading and removal plans.
iii. Utility plans (stormwater, sanitary, water and electrical).
iv. Stormwater management plan.
v. Stormwater pollution prevention plan.
vi. Field layout, grading and drainage plans.
vii. Sports lighting equipment procurement.
viii. Sports equipment and accessory procurement.
ix. Restoration and planting plan.
x. Utility details.
xi. Long-lead building systems or site amenities.
xii. Project manual.
b. Submit package for partial permit review, bid and construction.
c. Continue Development of Scope for Bid Package 2, updating:
i. Building plans and elevations.
ii. Site structures.
iii. Overall site imagery.
iv. Project cost model.
v. Project schedule.
d. Hold regular design coordination meetings between Mammoth and the City.
3. Bid Package 2 – Vertical construction and final site amenities.
a. Develop bid package incorporating buildings, site structures, and
additional site amenity improvements to include:
i. Site plan.
ii. Paving layouts.
iii. Area lighting.
iv. Site electrical.
v. Site structures and accessories.
vi. Site details.
vii. Building plans and elevations.
viii. Finish plans.
ix. Mechanical, electrical and plumbing plans.
x. Building details.
xi. Project manual.
b. Submit package for final permit review and construction.
4. Construction and coordination (by amendment of this Agreement by the City and Mammoth.)
a. Develop construction clarifications based on final design.
b. Provide review of construction submittals and requests for information
c. Attendance at regularly scheduled City/designer/contractor meetings both
virtually and on-site.
d. Review construction progress and provide verification of Substantial Completion.
5. Additional design scope may be added by amendment as requested by the City.
Phase 3- Construction Services
• Scope and Construction Costs TBD from Phase 1 and Phase 2
• Construction Agreement/Amendment to be executed between the City and
Mammoth for Construction Services pursuant to Exhibit B hereto.
Fees and Expenses for Scope of Design Services
Phase 1 Fees $65,000
Phase 2 Fees TBD per Phase 1
Phase 3 Fees TBD per Phase 1 and Phase 2 and established by written amendment
between Mammoth and the City pursuant to Exhibit B of this
Agreement.
Fees for Phase 2 and Phase 3 shall be determined and agreed to in writing by each Party and any
such writings may be treated as a supplement to this Exhibit A. Project expenses incurred and
related to the project, to be billed direct to the City for payment, unless otherwise agreed by
the Parties in writing.
Payment
The City agrees to pay Mammoth 50% of all fees ($32,500.00) for Phase 1 upon execution of this
Agreement. Thereafter, the remaining fees for Phase 1, and subsequent Phases, to be
billed/invoiced to the City on a monthly basis and upon completion of work. Project expenses
incurred and related to the project, to be billed direct to the City for payment, unless otherwise
agreed by the Parties in writing. The City is authorized to hold a minimum of 10% retainage
pending completion of each Phase pending completion of such phase as agreed in writing between
the Parties.
Schedule
Upon the Effective Date, initial meetings, and development to begin in May 2024 and shall continue
until completion.
This Exhibit A is incorporated into the Agreement as of the Effective Date.
Signature Page to Exhibit A
CITY OF WESTMINSTER, MAMMOTH SPORTS CONSTRUCTION, LLC
SOUTH CAROLINA
CITY (Signature) (Signature)
Jacob Farrant, CEO
(Printed name and title) (Printed name and title)
EXHIBIT B
SCOPE OF CONSTRUCTION SERVICES
WESTMINSTER SPORTS COMPLEX
This Exhibit B is incorporated into the accompanying AGREEMENT FOR DESIGN,
DEVELOPMENT, PRE- CONSTRUCTION, AND CONSTRUCTION SERVICES dated
_______, 2024 (the “Agreement”). Terms using initial capitals herein and not otherwise defined
shall have the meanings ascribed thereto in the Agreement..
BETWEEN the City:
and Mammoth:
for the following Project:
Westminster Sports Complex in Westminster, South Carolina
The City and Mammoth agree that Mammoth will prepare for execution by both Parties an
amendment to this agreement (Exhibit B) that will include the Scope of Construction Services,
contract sum for construction services, construction schedule, and any other information that is
necessary and agreed to by the Parties for the construction phase of the project, or alternatively for
Mammoth to serve as a construction manager to the City for the Project.
City of Westminster, South Carolina 100 E.
Windsor Street
PO Box 399
Westminster, SC 29693
Mammoth Sports Construction, LLC601 E
Wyandotte St
Meriden, KS 66512
City of Westminster| PO Box 399 | Westminster, SC 29693 | 864.647.3200 |www.westminstersc.org
CITY OF WESTMINSTER RECREATION PLANNING COMMITTEE MEETING
DRAFT MINUTES
April 10, 2024 @ 4:00 PM
Westminster City Hall
100 E Windsor Street, Westminster, SC
Attendance:
Present: Mayor Brian Ramey, Councilman Adam Dunn, Recreation Director Herb Poole, Steve
Grogan, Suzette Snedigar, Chester Lee (Late)
Absent: Kelley Boone
Staff: Kevin Bronson, Reagan Osbon
Other: Councilman Dale Glymph, Councilman Jimmy Powell, Andrea Kelley (The Seneca Journal)
1. Call to Order- 4:00pm by Brian Ramey
2. Consideration of October 11, 2023 Meeting Minutes
a. Motion by Adam Dunn, Seconded by Steve Grogan. Approved 6-0.
3. Update and Discussion about Hall Road and Sports Facility Company (SFC).
a. Kevin Bronson led the group in a discussion and summarized the SFC Pro-Forma
Review and Market Opportunity Report.
b. Ramey asked if we needed 4 400’ fields. It would be good tournament play and
opening additional fields for soccer and football as needed.
c. Bronson highlighted that we expect an operating loss on the outdoor recreation
facility and to make money on the indoor recreation in the long run, which is typical
for these complexes of any size.
d. Mammoth’s capital cost estimates are little higher on the outdoor recreation and
lower on the indoor recreation.
e. Dunn: Can we phase to where it is sightly and usable? Bronson: We could make that
a priority later on.
f. Ramey: Success will be important to get state and county buy-in.
g. Bronson will send a link to join in on the SFC call on Tuesday at 11:00.
h. Ramey: Ask locals to support the project by offering services pro-bono or at cost.
This will not supersede the timeline.
i. Bronson: We will go after additional funding for the project from local private
industries.
RECESS CALLED BY RAMEY at 5:07, RECONVENE AT 5:15
4. Presentation from Mammoth Construction (Virtual Meeting to begin at 5:15pm)
a. Present from Mammoth: Erica Schilling, Charlie Ochs, Matt Hohns, David Devore,
and Greg Wisecarver (SFC).
City of Westminster| PO Box 399 | Westminster, SC 29693 | 864.647.3200 |www.westminstersc.org
5. Consideration and Discussion of Next Steps- Hall Road
a. Ramey: They love what they do, meaning they will do it well.
b. Dunn: Mammoth can help break down pricing and help advise on levels that will
prove beneficial financially and in product.
i. Grogan: At Lander, we were bound to the low bidder (state procurement),
leading to below expectations in certain parts of capital investments due to a
break down of many layers of subcontractors. Mammoth is all in house,
saving cost and communication breakdown.
c. Ramey directed Bronson to explore their willingness and cost to assist with the
capital fundraising campaign.
COMMITTEE CONSENSUS: Bronson to check on our own procurement to make sure that we can
engage in negotiations with Mammoth. If so, Kevin should request a proposal to bring before City
Council. The Recreation Committee should not need to reconvene unless they are unable to proceed
with mammoth. In which case, we would reissue the RFP.
6. Additional Discussion by the Committee
7. Adjourn- Motion by Steve Grogan, Seconded by Chester Lee. 6-0 to adjourn at 6:50pm.