08082023 AGENDA PACKET ONLINE
City of Westminster · Oconee County · meeting of Oct 26, 2023 · Agenda packets
Open the original document More from City of Westminster
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
CITY OF WESTMINSTER REGULARLY SCHEDULED MEETING
August 8, 2023 @ 6:00 PM
Westminster Fire Department
216 Emergency Lane, Westminster
C
all to Order
I
nvocation & Pledge of Allegiance
C
ertification of Quorum
P
ublic Comments:
The floor is now open for public comments. Citizens of Westminster or others who have registered for time with the Clerk can now address
Council for any matters on tonight’s agenda or other matters you wish to bring before the Council. Speakers are allowed
up to 3 minutes and possibly longer if that Speaker is recognized in advance as representing a larger group with similar concerns. To preserve the
decorum of this public meeting, and to allow adequate time for discussion among the elected membership of City Council, this will be the only
time we will receive unsolicited comments tonight from the public.
C
omments from the Mayor and Council
R
outine Business
1. Approval of the June 13, 2023, Regular Meeting Minutes
2. Comments from the Utilities Director
a. Downtown maintenance
b. Downtown parking strippin g
c. ot
her
3. Comments from City Administrator
a. USDA-RD Water System Project
b. Anderson Park renovation update
c. Website update
d. Hall Road Community Park update
e. Other
Old
Business
4. C
onsideration of Second Reading of ORDINANCE #2023-08-08-01 CITY OF
WESTMINSTER; AN ORDINANCE AMENDING SECTION 50.01 OF THE CITY OF
WESTMINSTER CODE OF ORDINANCES REGARDING THE ANNEXATION OF
PROPERTIES LOCATED OUTSIDE OF THE CITY AS A CONDITION TO FO
R
TH
E CITY TO PROVIDE CERTAIN UTILITY SERVICES, AND OTHER
MATTERS RELATED THERETO.
I
n May of 2021 the Council passed Ordinance No. 2021-05-11-01 stipulating the use of
annexation covenants when approving electric, water or sewer service(s) of properties
located out the City. This Ordinance and the additional documentation are provided for
1
the amendment. Staff presents this consideration at the suggestion of legal counsel for
two reasons:
Electric service is removed from the language. This will simplify future
considerations of potential operations and/or maintenance agreements with a
third party (i.e. removal of electric service simplifies future contractual
agreements).
Insertion of language to clarify the intent and practice of collecting annexation
covenants for “New Services.”
T
here are three documents offered for this item. The first is the Ordinance which amends
the City Code (edits are noted to the right side of the page); the second is a revised
Declaration of Annexation Covenants which is used when a service agreement is
accepted; and the third is an edited version of Section 50.01 of the City’s Code (edits are
noted on the right side of the page).
St
aff recommends approval.
N
ew Business
5. C o
nsideration of ORDINANCE NO. 09-12-2023-01; AN ORDINANCE TO REZONE A
CE
RTAIN PARCEL IN THE CITY OF WESTMINSTER FROM R-25 (ONE-
FAMILY RESIDENTIAL) TO MFR (MULTI-FAMILY RESIDENTIAL).
The Westminster Planning Commission met on Monday, July 17, 2023, to consider two
items for recommendation for City Council.
This ordinance is for the Consideration of Zoning Amendment Application 2023-001 by
Jonathan Terry for 104 Highlands Ave from R-25 to MFR. The applicant presented site
plans and the Amendment Application to the commission and stated that he planned to
develop duplexes and small, high density single-family units on the 11.5 Acre property.
Applicant intends to sell the homes for about $220,000-$230,000 after development.
The Commission asked questions about greenspace, density of units, and continuity of
adjacent properties. Applicant said that he intended to incorporate greenspace into the
final design plan, likely around the currently abandoned home on the property at the end
of Dickson St. Applicant and commission agreed that current zoning regulations, even for
MFR, would not allow an overly dense development. The MFR designation would match
the zoning of two adjacent HUD supported housing complexes.
The Commission recommended approval of the Application, by a vote of 5-0
(unanimous). Additional information from the meeting is included in the attached.
Staff recommends approval.
6. C onsideration of ORDINANCE NO. 09-12-2023-02; AN ORDINANCE TO REZONE
A
CE
RTAIN PARCEL IN THE CITY OF WESTMINSTER FROM R-15 (ONE-
FAMILY RESIDENTIAL) TO MFR (MULTI-FAMILY RESIDENTIAL).
2
Consideration of Zoning Amendment Application 2023-002 by the City of Westminster
for 115 Riley Ave from R-15 to MFR. The City, applicant and owner, has agreed to
convey the property to Westminster Hope ComeUnity, a local nonprofit group, contingent
upon rezoning to MFR. Westminster Hope ComeUnity seeks to use the vacant lot,
formerly the City Recycling Center, to build three small single-family homes for
individuals and families who are without a home for several months while they prepare
for and find a permanent residence. The proposed structures would not serve as a
“homeless shelter” and beneficiaries will have to complete an application, a drug
screening, and have no record of violent crimes (including being a sex offender or
convicted of other serious crimes.
The Commission did not recommend approval of the application to council, and members
cited concerns about location (proximity of a vulnerable population to the HUD
supported housing) and ability of the organization to properly manage the project (citing
inexperience, not intention as a basis).
The Commission did not recommend approval of the Application by a vote of 2-2 (1
abstention). Additional information from the meeting is included in the attached.
Staff recommends approval.
7. Consideration of ORDINANCE NO. 09-12-2023-03; AUTHORIZING
AN
EQ
UIPMENT LEASE PURCHASE AGREEMENT IN THE AMOUNT OF NOT
EXCEEDING $540,000 BETWEEN THE CITY OF WESTMINSTER, SOUTH
CAROLINA, AND FIRSTCITIZENS BANK & TRUST COMPANY, TO DEFRAY
T
HE COST OF ACQUIRING CERTAIN EQUIPMENT; AND OTHER MATTERS
RELATING THERETO.
The City’s FY2023-2024 Annual Budget includes the equipment listed below to be
purchased using lease-purchase financing. First Citizens Bank offers a competitive lease-
purchase financing product that meets the requirements of South Carolina law for
municipal financing. The City’s bond Counsel, Mike Burns and Brandon Norris with the
Burr Foreman law firm have reviewed and approved of the financing documents, they
also wrote the ordinance.
Equipment Estimated Cost
Two (2) Police Vehicles $ 90,000
One (1) Public Works Vehicle $ 44,045
One (1) Water Pickup $ 46,000
One (1) Sewer Tractor $ 55,000
One (1) Leaf Truck
$277,000
TOTAL ESTIMATED COST $512,045
The not-to-exceed lease-purchase financing of $540,000 includes closing costs. The final
amount will be determined at closing. The interest rate is fixed and is bank-qualified at
4.48% for 5 years. There are no fees for pre-payment.
3
Staff recommends approval.
8. Consideration of ORDINANCE NO. 09-12-2023-04; AN ORDINANCE TO
ESTABLISH A REGISTRATION FOR VACANT AND ABANDONED BUILDINGS,
TO AMEND THE CITY’S CODE OF ORDINANCES IN CONNECTION
TH
EREWITH, AND OTHER MATTERS RELATED THERETO.
Vacant properties have a greater potential than occupied properties to cause significant
and costly problems for the City. These properties often require greater levels of service
from law enforcement, codes enforcement, and other City services and, thereby create a
financial burden for the City and detract from the quality of life of the surrounding
neighborhoods and the City as a whole. Vacant buildings are an impediment to
neighborhood redevelopment and rehabilitation, decrease property values, and prevent
neighborhood stabilization. Vacant properties have a greater likelihood of becoming
unsightly, structurally unsound, and otherwise dangerous; of attracting criminal activity,
and of otherwise creating a threat to public health, safety, and welfare of neighboring
properties and the general public.
One mechanism for addressing these types of properties is a registry system that compels
property owners to register their properties with the City. A fee schedule enhances the
registry system.
This ordinance establishes the registry system.
Staff recommends approval.
9. C
onsideration of RESOLUTION NO. 08-08-2023-01; A RESOLUTION ADOPTING
THE EMERGENCY OPERATIONS PLAN AND EMERGENCY PREPAREDNESS
GUIDELINES; AND OTHER MATTERS RELATED THERETO
O
n November 15, 2023, City Councial adopted the City of Westminster Emergency
Operations Plan and Emergency Preparedness Guidelines (EOP). In March 2023 the
Multi-Jurisdictional Hazard Mitigation Plan, Anderson and Oconee County was adopted.
T
his Resolution strengthens the City’s EOP by incorporating the Multi-Jurisdictional
Hazard Mitigation Plan Anderson and Oconee County as part of the City’s emergency
preparedness plans.
T
he purpose of these collective plans is to establish policies and procedures which in the
event of a man-made or natural disaster will allow for the most effective utilization of
resources within the City and minimize the loss of life and/or injury or loss of property.
St
aff recommends approval.
10. Co
nsideration of RESOLUTION NO. 08-08-2023-02; A RESOLUTION APPROVING
THE EXECUTION AND DELIVERY OF A MEMBERSHIP AGREEMENT
BETWEEN THE CITY OF WESTMINSTER AND THE SOUTH CAROLINA
ASSOCIATION OF MUNICIPAL POWER SYSTEMS (“SCAMPS”); APPROVING
THE EXECUTION AND DELIVERY OF A SERVICES AGREEMENT BETWEE
N
4
SCAMPS AND THE MUNICIPAL ASSOCIATION OF SOUTH CAROLINA; AND
OTHER MATTERS RELATED THERETO
The City is a member of the South Carolina Association of Municipal Power Systems
(SCAMPS). Membership in the SCAMPS is important for various reasons, especially for
mutual aid organization and assistance.
At the SCAMPS Annual Meeting on June 6, 2023, 16 of the 20 SCAMPS members
approved in concept the SCAMPS Membership and Services Agreements, subject to the
approval of their elected board or council. Of note is SCAMPS plans to hire a full-time
staff member, which will be managed by the Municipal Association of South Carolina
(MASC).
Westminster’s previous dues were $451.50 per year. Under the new agreement
Westminster’s due will increase to $2,370.76 for the first of a three-year agreement. Dues
will then increase to $2,430.03 for FY2025 and $2,490.78 for FY2026. The prevailing
thought amongst many of the SCAMPS members is that a full-time staff person will
enhance each member’s ability to respond to federal, state and local challenges.
Westminster’s proposed FY2024 Budget includes funds to cover the proposed $2,370.76
dues.
The next step in making the desired changes with SCAMPS is the approval of the
attached corporate resolution by each member's board or council by August 4, 2023 (the
Municipal Association of South Carolina is aware Westminster’s City Council Meeting is
August 8, 2023 and has granted Westminster an allowance for the additional days). The
resolution authorizes the designated officials for each member to execute and deliver the
membership agreement between the member and the SCAMPS and approves a services
agreement between SCAMPS and the Municipal Association of SC.
Attached are the SCAMPS Membership and Services Agreements.
Staff recommends approval.
11. Consideration of an action to designate the proceeds of $71,500 payment from Pioneer
Rural Water District of Oconee and Anderson Counties for 3.7 mile water line.
At the September 13, 2022, City Council Meeting, the Council approved an Agreement
for the Transfer of Water Line to Pioneer Rural Water District of Oconee and Anderson
Counties for $71,500 for a “water line running 3.7 miles from the intersection of Hwy 24
and S. Hampton St. (34.64830 – 83.07407) to the intersection of Fire Tower Rd. and
Hwy 24. (34.61092 – 83.03943) in Westminster.” On June 22, 2023, City staff receipted
the payment for the transaction. The funds from this transaction are not budgeted for
revenue in the FY2023-2024 Annual Budget.
For Council’s consideration:
1) Receive the funds with no additional action thereby allowing the fund balance
of water system fund (the Combined Utility Fund) to increase.
5
2) Designate the funds for a particular project or other endeavor.
3) Another action as Council may direct.
12. Consideration of proposal from Seamon Whiteside (SW+) for Westminster Downtown
Streetscape Improvements | Phase I
The 2023 downtown master plan was accepted by City Council on April 18, 2023. The
plan includes a renovated streetscape for Main Street and the side streets in between
Main Street and Windsor Street for the length of the downtown. Staff is currently working
on grant applications for Community Development Block Grant (CDBG) funds and
Appalachian Regional Commission (ARC) funds to pay for the construction of the
anticipated Phase I which this proposal contemplates.
The grant applications will be made using staff estimates from recent projects of similar
ilk. To be prepared to execute the construction of the streetscape renovations after
funding is secured, the streetscape must be designed and engineered. The attached
proposal fees from SW+ are:
Division 1: Schematic Design (30% Design) $19,500
Division 2: Design Development (60% Design) $23,000
Division 3: Construction Documents $49,000
Division 4A: Permitting Coordination $17,500
Division 4B: Railroad Permitting Coordination $ 7,500
Division 5: Bidding and Negotiation $ 6,000
Division 6: Construction Phase Services Hourly
Division 7: Coordination Meetings/Conference Call Hourly
One other professional design and engineering service firm was asked to prepare a price
proposal, it did not submit one.
Staff recommends approval of the SW+ proposal using General Fund fund balance.
13. Mobile stage for Cross Hill Fellowship
Executive Session
1. Executive Session for the purpose of discussion of negotiations incident to proposed contractual
arrangements and proposed sale or purchase of property, the receipt of legal advice where the
legal advice relates to a pending, threatened, or potential claim or other matters covered by the
attorney-client privilege, settlement of legal claims, or the position of the public agency in other
adversary situations involving the assertion against the agency of a claim pursuant to S.C. Code
Ann. 34-4-70 (2).
(1) Contractual agreements between the City of Westminster and Oconee County
regarding Fire Service
Adjourn
6
1
June 13, 2023
MINUTES
WESTMINSTER CITY COUNCIL
Regular Scheduled Meeting
Tuesday, June 13, 2023
The City Council of the City of Westminster met in a regular scheduled meeting on Tuesday, June
13, 2023, at 6:00 pm at the Westminster Fire Department with Mayor Brian Ramey presiding.
Those in attendance were:
Brian Ramey Dale Glymph Daby Snipes Ruth May
Jimmy Powell Audrey Reese Adam Dunn
City Administrator, Kevin Bronson
Assistant to the City Administrator, Reagan Osbon
City Clerk, Rebecca Overton
Police Chief, Matt Patterson
Fire Chief, Michael Smith
Utility Director, Kevin Harbin
City Attorney, Andrew Holliday
Members of the public and press
Notice of the meeting and the agenda was posted on a window at the Fire Department and at
westminstersc.org twenty-four hours prior to the meeting and all persons, organizations and
local media requesting notification and the agenda were notified by email.
Call to Order
Mayor Ramey called the meeting to order at 6:00 pm.
Invocation and Pledge of Allegiance
Mrs. Audrey Reese led the Council in the invocation and the Pledge of Allegiance.
Certification of Quorum
Rebecca Overton certified a quorum.
Public Comments
There were no public comments.
Public Hearing for FY2023-2024 Budget
7
2
June 13, 2023
Upon a motion by Mayor Ramey and seconded by Mrs. Reese, the motion to open the
public hearing for the FY 2023-2024 Budget passed unanimously.
There were no comments from the public.
Upon a motion by Mayor Ramey and seconded by Mrs. Reese, the motion to close the
public hearing for the FY 2023-2024 Budget passed unanimously.
Comments from the Mayor and Council
Mrs. Reese thanked everyone who had parts in the recent events around town. Mrs. Snipes
thanked Kevin Bronson and Staff on their recent work on the completion of the budget
process. Mayor Ramey suggested that fellow members of Council be speaking to local
officials about trying to keep the potential new middle school in the City limits. He also
announced that he would be seeking another term for Mayor in the upcoming election.
Presentation by Libby Imbody with Authenti
City - City Marketing and Branding
Libby Imbody introduced new logos and taglines to Council and stated that she had been
working since January on new ideas to help sell the city and also help implement some ideas
from the recent Downtown Master Plan. All of Council agreed with the logos and plans
presented.
Routine Business
1. Approval of the May 9, 2023, Regular City Council Meeting Minutes
Upon a motion by Mayor Ramey and seconded by Mrs. Reese, the motion to
approve the May 9, 2023, Regular Meeting Minutes passed unanimously.
2. Approval of the May 18, 2023, Called Meeting Minutes
Upon a motion by Mr s. Reese and seconded by M s. May, the motion to approve
the May 18, 2023, Called Meeting Minutes passed unanimously.
Member Motion Vote
Ramey Motion Yes
Glymph Yes
Powell Yes
Reese Second Yes
May Yes
Dunn Yes
Snipes Yes
8
3
June 13, 2023
3. Comments from the Utility Director
a. Mr. Harbin informed Council that a tree had fallen on lines and across the road on
N Isundega Street which caused about 12 outages for a few hours until crews
made repairs.
b. Mr. Harbin informed Council that crews had been working on replacing a water
line on Frank Street and that sewer crews were still addressing various sewer
issues.
c. Mr. Harbin informed Council that the next C Funds project is still on hold until
the Oak Street survey process is completed.
4. Comments from City Administrator
a. Mr. Bronson offered his apologies to Dot’s Kitchen adding that he had stated
wrong information concerning the status of their utility account payments. He
added that they are self supporting and the City does not cover the utility bill
there.
b. Mr. Bronson informed Council that the USDA water project contract had been
awarded to two Contractors and they were waiting on notices to proceed.
c. Mr. Bronson informed Council that the RIA SCIIP sewer project is also waiting
on notices to proceed and will likely begin after the first of the year.
d. Mr. Bronson informed Council that the Boudrex Group had recently completed
a study of City Hall, the Polic Department, and old Magistrate Office buildings
to determine the best suit for centralized locations of a Welcome Center and
Council Chambers. He added that further discussions will be held for funding
ideas.
e. Mr. Bronson informed Council that the Seed Farm Road neighborhood
developers are interested in the neighborhood being in the city limits and the
water and sewer projects for that location will be bid out.
f. Mr. Bronson informed Council that he had Staff working on a vacant building
Ordinance and was asking for direction from Council. Council agreed for Mr.
Member Motion Vote
Ramey Yes
Glymph Abstain
Powell Yes
Reese Motion Yes
May Second Yes
Dunn Yes
Snipes Yes
9
4
June 13, 2023
Bronson and Staff to move forward with the development of a vacant building
Ordinance.
g. Mr. Bronson informed Council that he had recently been asked to review the
possibility of a Virtual Council Attendance Ordinance. He added that such an
Ordinance would apply to all Boards and would allow members to attend
virtually. Mr. Bronson asked Council if they wished to proceed with this. After
discussion, the subject was tabled until the fall.
Old Business
1. Consideration of Hospitality Tax Grant request from the Oconee History Museum and
Consider Appropriation(s) related thereto to be incorporated into Ordinance 2023-06-13-
01.
Mr. Bronson informed Council that due to some incorrect information, the
Oconee History Museum was taken out of HTAX Grant considerations. He
added that their original request was $8,000 and he suggested absorbing $4,000
on their utility account with an account credit, and the other $4,000 to come from
the ATAX fund balance. Mr. Bronson added that recent projects completed from
the HTAX and ATAX fund balances would warrant later discussion because
there would be much less funds available for grant applicants.
Upon a motion by Mrs. Reese and seconded by Mrs. Snipes, the motion to
approve $8,000.00 to the Oconee History Museum by crediting $4,000.00 to the
utility account and a $4,000.00 ATAX Funds Grant passed unanimously.
2. Consideration of Second Reading of Ordinance No. 2023-06-13-01, Budget Ordinance;
An Ordinance Making Appropriations for Certain Expenses, Capital Improvements and
Indebtedness of The City of Westminster, South Carolina for the Year Beginning July 1,
2023, and ending June 30, 2024.
Appropriation Amount
General $2,914,572
Utility $8,301,415
Member Motion Vote
Ramey Yes
Glymph Yes
Powell Yes
Reese Motion Yes
May Yes
Dunn Yes
Snipes Second Yes
10
5
June 13, 2023
Solid Waste $915,046
ATAX $8,300
HTAX $484,314
Fire Department 1% $13,609
Local Development Corp $47,031
Youth Recreation Fund $579,319
Capital Projects Fund $14,530,684
County ARP $682,324
Grand Total $28,476,614
Less Interfund Transfers $1,405,869
Net Appropriations $27,070,745
Mr. Bronson informed Council that this ordinance sets the fiscal year 2023-2034
(FY2024) annual budget. He added that this is the same budget that was proposed
at the April 25, 2023, City Council Budget Workshop and that notice of the Public
Hearing ran in the Seneca Journal on May 26, 2023.
Upon a motion by Mr. Dunn and seconded by Mrs. Snipes the motion to approve
the Second Reading of Ordinance No. 2023-06-13-01, as amended to include a
$4,000 ATAX Fund Grant to Oconee History Museum passed unanimously.
3. Consideration of Second Reading of Ordinance #2023-06-13-02; An Ordinance to
Execute Real Property Sale and Purchase Agreement (“Agreement”) by and between the
City of Westminster, South Carolina (“Seller”), a body politic and corporate and a
political subdivision of the State of South Carolina, and Westminster Hope ComeUnity
(“Buyer”), a South Carolina non-profit Corporation. For the parcel (Tax Map #530-21-
06-015) of approximately 1.34 acres located at 115 Riley Street to Westminster Hope
ComeUnity for $10,000 contingent upon rezoning from R15 to GR.
Member Motion Vote
Ramey Yes
Glymph Yes
Powell Yes
Reese Yes
May Yes
Dunn Motion Yes
Snipes Second Yes
11
6
June 13, 2023
At this time, Mrs. Reese stepped out of the room and recused herself from any
discussion and vote.
Mr. Bronson reminded Council that this second reading would allow the
Westminster Hope to purchase the City owned property located at 115 Riley
Street.
Upon a motion by Mr. Dunn and seconded by Mrs. Snipes, the motion to approve
Second Reading of Ordinance #2023-06-13-02; An Ordinance to Execute Real
Property Sale and Purchase Agreement (“Agreement”) by and between the City
of Westminster, South Carolina (“Seller”), a body politic and corporate and a
political subdivision of the State of South Carolina, and Westminster Hope
ComeUnity (“Buyer”), a South Carolina non-profit Corporation. For the parcel
(Tax Map #530-21-06-015) of approximately 1.34 acres located at 115 Riley
Street to Westminster Hope ComeUnity for $10,000 contingent upon rezoning
from R15 to GR passed unanimously.
New Business
1. Consideration of First Reading of Ordinance #2023-08-08-01 City of Westminster;
An Ordinance Amending Section 50.01 of the City of Westminster Code of
Ordinances Regarding the Annexation of Properties Located Outside of the City as a
Condition to for the City to Provide Certain Utility Services, and Other Matters
Related Thereto.
Mr. Bronson reminded Council that in May of 2021, Council passed Ordinance
No. 2021-05-11-01 stipulating the use of annexation covenants when approving
electric, water or sewer service(s) of properties located out the City. He added
that staff was presenting consideration of changes at the suggestion of legal
counsel for two reasons:
A. Electric service is removed from the language. This will
simplify future considerations of potential operations and/or
Member Motion Vote
Ramey Yes
Glymph Yes
Powell Yes
Reese Recusal
May Yes
Dunn Motion Yes
Snipes Second Yes
12
7
June 13, 2023
maintenance agreements with a third party (i.e. removal of
electric service simplifies future contractual agreements).
B. Insertion of language to clarify the intent and practice of
collecting annexation covenants for “New Services.”
Mr. Bronson clarified that the three documents offered for this item are: the first
is the Ordinance which amends the City Code (edits are noted to the right side of
the page); the second is a revised Declaration of Annexation Covenants which is
used when a service agreement is accepted; and the third is an edited version of
Section 50.01 of the City’s Code (edits are noted on the right side of the page).
Upon a motion by Mrs. Snipes and seconded by Mrs. Reece, the motion to
approve First Reading of Ordinance #2023-08-08-01 City of Westminster; An
Ordinance Amending Section 50.01 of the City of Westminster Code of
Ordinances Regarding the Annexation of Properties Located Outside of the
City as a Condition to for the City to Provide Certain Utility Services, and Other
Matters Related Thereto passed unanimously.
2. Presentation of Schedule for the Planning Commission and City Council
considerations of edits and adoption of:
a. Zoning Ordinance
b. Bylaws for Planning Commission and Board of Zoning Appeals
c. Future Land Use Map amendments
d. Land Development Regulations
Mr. Reagan Osbon provided an update to the Council on the recent efforts by the
Planning Commission to update the Zoning Ordinance and the Future Land Use
Map. He added that he will working more with the Planning Commission to wrap
up the efforts of these updates. Mr. Osbon added that the schedule he will try to
follow will be:
• July: Introductions, discuss schedule of monthly meeting over the next several
months, establish definitions of new terms, and the processes of the Planning
Commission and BZA.
Member Motion Vote
Ramey Yes
Glymph Yes
Powell Yes
Reese Second Yes
May Yes
Dunn Yes
Snipes Motion Yes
13
8
June 13, 2023
• August: Discuss why this is important, how the city can use these tools, and
overview of the Planning Commission bylaws.
• September: Discuss Zoning Ordinance and review the possible zoning
designations.
• October: Discuss Section 1 of the Future Land Use Map.
• November: Discuss Section 2 of the Future Land Use Map.
• December: Discuss Section 3 of the Future Land Use Map.
• January: Discuss Section 4 of the Future Land Use Map.
3. Consideration to Cancel July 11, 2023, City Council Meeting
Upon a motion by Mrs. Reese and seconded by Mr. Dunn, the motion to cancel
the July 11, 2023, City Council Meeting passed unanimously.
4. Consideration of bid award for 2023 Kawasaki Mule side by side for Westminster
Fire Department. To be funded by SC LLR VSAFE grant for $12,300 plus sale of
surplus Fire Department equipment. Bids to be provided at City Council Meeting.
Mr. Bronson provided Council with the following three quotes for a Kawasaki
Mule: Mega Motorsports for $17,961.02, Foothills Motorsports for $16,853.93,
and Performance Powersports for $16,853.00. He added that the funding for the
equipment was coming from a State Grant and sale of surplus equipment.
Upon a motion by Mr. Dunn and seconded by Mrs. Reese, the motion to approve
the purchase of a Kawasaki Mule from Performance Powersports in the
amount of $16,853.00 passed unanimously.
Member Motion Vote
Ramey Yes
Glymph Yes
Powell Yes
Reese Motion Yes
May Yes
Dunn Second Yes
Snipes Yes
Member Motion Vote
Ramey Yes
Glymph Yes
Powell Yes
Reese Second Yes
May Yes
Dunn Motion Yes
Snipes Yes
14
9
June 13, 2023
Executive Session
Upon a motion by Mrs. Snipes and seconded by Mr. Glymph, the motion to enter executive
session passed unanimously.
Upon a motion by Mrs. Snipes and seconded by Mr. Glymph, the motion to exit executive
session passed unanimously.
Adjourn
Upon a motion by Mrs. Reese and seconded by Mrs. Snipes, the motion to adjourn the meeting
at 8:45 pm passed unanimously.
(Minutes submitted by Rebecca Overton)
__________________________________ _____________________
Mayor Brian Ramey Date
15
1
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE ) ORDINANCE #202 3-08-08-01
)
CITY OF WESTMINSTER )
AN ORDINANCE AMENDING SECTION 50.01 OF THE CITY OF
WESTMINSTER CODE OF ORDINANCES REGARDING THE
ANNEXATION OF PROPERTIES LOCATED OUTSIDE OF THE CITY AS
A CONDITION TO FOR THE CITY TO PROVIDE CERTAIN UTILITY
SERVICES, AND OTHER MATTERS RELATED THERETO.
NOW THEREFORE, BE IT ORDAINED by the City Council of the City of
Westminster (the “City Council”), the governing body of the City of Westminster, South Carolina
(the “City”), as follows:
Section 1 Findings. The City Council hereby makes the following findings of fact in
connection with the enactment of this ordinance (this “Ordinance”):
(a) T he City is authorized by the general powers given to municipalities and Section
5-7-60 of the Code of Laws of South Carolina 1976, as amended, to provide water , sewer and
electric service (“Utility Service ”) to individuals and properties located outside of the corporate
boundaries of the City by contract.
(b) Pursuant to Ordinance No. 2021-05-11- 01, enacted on May 11, 2021, the City
Council amended Section 50.01 of the City’s Code of Ordinances to include subsection (E) (the
“Annexation Requirement”), pursuant to which the City Council made it the policy of the City to
require annexation as a condition of allowing new or upgraded connections to the City’s water,
sewer, and electric utility system.
(c) The City Council wishes to amend the Annexation Requirement to clarify the
circumstances under which the City will require annexation, and to eliminate the City’s electric
system from those utility services for which annexation is required as a condition of service.
(d) In order to accomplish these purposes, the Council now desires, through the
enactment of this Ordinance, to revise the Annexation Requirement as set forth herein.
Section 2 Amendments to Annexation Requirements. By and through the
enactment of this Ordinance, Chapter 50, Section 50.01(E) of the City’s Code of Ordinances shall
be amended to read, in its entirety, as follows:
Sec.
50.01 - FURNISHING ELECTRICITY, WATER AND SEWER SERVICE.
(E) It shall be the policy of the City to require that the owner of any property located
outside of the City’s corporate boundaries (a “Subject Property”) that requests
16
2
New Service (as defined herein) from the City’s water or sewer (the “Utility
System”) be required to annex the Subject Property into the City at such time
as the Subject Property is contiguous to the corporate boundaries of the City.
(1) If the Subject Property is contiguous to the City at the time such request is
made, the owner thereof shall be required to submit an annexation petition
to the City prior to the connection to the Utility System being made.
(2) If the Subject Property is not contiguous to the corporate boundaries of the
City at the time such request is made, the owner of the Subject Property
shall be required to execute a covenant to annex the Subject Property into
the City (an “Annexation Covenant”) prior to any connection to the Utility
System being made, requiring the owner of the Subject Property, or any
subsequent owner, to take such action necessary to annex the Subject
Property, any portion thereof, or any larger property to which the Subject
Property was added, into the City at such time as the Subject Property, any
portion thereof, or any larger property to which the Subject Property was
added becomes contiguous to the corporate boundaries of the City. The
Annexation Covenant shall be in a form to be approved by the Council.
(3) The Council may waive this requirement with respect to any property
through the adoption of a resolution that includes specific findings in
connection with the justifications of such waiver and a finding that such
waiver is in the best interest of the City and its citizens.
(4) “New Service” for the purposes of this subsection (E), means (i) a request
to make a new physical connection for a Subject Property to either
component of the Utility System; (ii) a request to reestablish service from
any component of the Utility System for a Subject Property that has
previously established a physical connection to such component of the
Utility System; or (iii) a request to transfer existing service for any
component of the Utility System for a Subject Property to a different party.
Section 3 Severability. If any section, subsection, sentence, clause or phrase of this
Ordinance or the Annexation Requirement, as amended hereby, is, for any reason, held or
determined to be invalid, such decision shall not affect the validity of the remaining portions of
this Ordinance or Annexation Requirement, as applicable.
Section 4 Savings Clause. Nothing in this Ordinance hereby enacted shall be
construed to affect any suit or proceeding impending in any court, or any rights acquired, or
liability incurred, or any cause of causes of action acquired or existing, under any act or ordinance
hereby repealed; nor shall any just or legal right or remedy of any character be lost, impaired or
affected by this Ordinance.
17
3
Section 5 Repealer; Effective Date. All ordinances or parts of ordinances
inconsistent or in conflict with the provisions of this ordinance are hereby repealed to the extent
of the conflict or inconsistency. This Ordinance shall take effect immediately upon its enactment
by the Council.
[REMAINDER OF PAGE INTENTIONALLY LEFT BLANK]
18
4
DONE AND ENACTED IN COUNCIL ASSEMBLED, this 11th day of July 2023.
CITY OF WESTMINSTER, SOUTH
CAROLINA
[SEAL]
Brian Ramey, Mayor
Attest:
Rebecca Overton, City Clerk
Reviewed by City Attorney and approved as
to form:
Andrew Holliday, City Attorney
First Reading: June 13, 2023
Second Reading: August 8, 2023
19
STATE OF SOUTH CAROLINA )
) DECLARATION OF ANNEXATION
COUNTY OF OCONEE ) COVENANT
)
CITY OF WESTMINSTER )
THIS DECLARATION OF ANNEXATION COVENANT (this “Covenant”) is made this ___
day of __________ 20__ between the City of Westminster, South Carolina (the “City”), and the person or
entity described below, including all successors in interest and assigns, having legal title to a present
possessory interest in real estate equal to a life estate or greater, or any other designation as set forth in the
Section 5-3-240 of the South Carolina Code of Laws 1976, as amended, or as set forth through judicial
interpretation in South Carolina case law (the “Owner”):
(_) A corporation, i ncorporated under the laws of the State of __________________and
organized under the name of
; or
(_) A g eneral or limited partnership, limited liability company, or limited liability
partnership operating under the name of
; or
(_) Individual(s) by the name(s) of
_ .
RECITALS:
WHEREAS, the r eal property located at
having Tax Map Number ( as further described
herein at Exhibit A , the “ Subject Property ”), belonging to the Owner, is located outside the City’s
corporate limits but is located in an area in which annexation into the City is or may become appropriate.
The City is under no obligation to furnish Utility Services (as defined herein) to properties located outside
of the City’s corporate limits, but may do so by contract with individual property owners.
W
HEREAS, the Owner wishes to obtain Utility Services from the City by contract without the necessity
of waiting until the Subject Property may be annexed into the City, and the Owner has entered into an
agreement (the “Customer Agreement”) with the City in order to secure one or more of the Utility Services
for the Subject Property. In consideration for the City’s provision of Utility Services to the Subject Property
and the connection of the Subject Property to the City’s combined utility system (the “System”), the Owner
agrees, pursuant to the provisions of this Covenant, to take such action as is necessary to request annexation
into the City at such time as the Subject Property becomes contiguous to the City’s corporate limits. This
Covenant shall be binding upon any and all assigns or successors in interest to the Owner’s ownership
interest in the Subject Property.
WHEREAS, Owner understands that the obligation to execute any and every annexation petition
relating to the Subject Property, when presented, is a requirement for Utility Services outside the City, and
that failure to satisfy this obligation may, at the election of the City, cause discontinuance and termination of
Utility Services to the Subject Property. The Owner further understands that the obligations created under
this Covenant run with the land and will apply equally to subsequent owners of the Subject Property. In
order to ensure the ability of the City to enforce the provisions of this Covenant against the Owner or any
subsequent owner of the Subject Property, the Owner agrees that the provisions of this Covenant shall serve
as restrictive covenants against the Subject Property in favor of, and for the benefit of, the City.
20
2
NOW THEREFORE, in consideration of the provision of Utility Services by the City, the Owner
hereby covenants as follows:
1. R ecitals Incorporated. The above recitals are hereby incorporated in and made a part of this
Covenant as fully as if set forth verbatim herein. These recitals are true and correct and the Owner is bound
thereby. By signing this Covenant, the Owner acknowledges reading, understanding, and agreeing to each
of the recitals. By and through the recording of this Covenant, all assigns and successors in interest in the
Subject Property are determined to have read, understood, and agreed to each of the recitals.
2. U tility Services.
A. As used in t his Covenant, “Utility Services” means and refers to any water, or sewer or
electric services, or any combination thereof, provided by the City pursuant to the terms of the Customer
Agreement, including but not limited to, (i) ongoing water, or sewer and electric service; (ii) a service tap
from existing water or sewer lines, (iii) a service connection from an existing electric line, (iii) an extension
of water or sewer mains or electric lines , or (iv) the issuance of a letter of willingness and capability to
provide Utility Services.
B. Pursuant to the provisions of the Customer Agreement, the City has agreed to furnish
Utility Services to the Subject Property upon the terms, conditions and covenants set forth therein, in
addition to any other rat es, classifications, policies, procedures, and terms of service applicable to Utility
Services that the City has adopted or may in the future adopt and any subsequent amendments thereto. The
Owner acknowledges that in no event shall the City be obligated t o provide or continue to provide Utility
Services to the Subject Property, or any portion thereof, if any obligation of the Owner contained in this
Covenant is breached or any covenant made by the Owner in this Covenant is false. Any actions or
statements made by the City (including the issuance of any letter of willingness and capability) in
connection with providing Utility Services to the Subject Property is made subject to the terms of this
Covenant, and if this Covenant is breached by the Owner then all such actions or statements may be, in the
City’s sole discretion, declared null and void and no reliance by any entity may be placed thereon.
3. C
ovenants by Owner . The Owner makes the following covenants, warranties, agreements and
representations, each of which shall be deemed material to this Covenant:
A. T he Owner covenants and agrees that he will sign any and every annexation petition which
relates to the Subject Property (an “Annexation Petition”) immediately upon presentment by the City. As used
in this Covenant, an Annexation Petition shall be construed to relate to the Subject Property if the property to
be annexed pursuant to and described in the Annexation Petition includes the Subject Property or any
portion thereof. The Owner acknowledges that a purpose of this Covenant is to ensure, as a material benefit
and consideration to the City, the Owner’s full and complete cooperation with any effort to annex the Subject
Property, and the Owner agrees, that upon request by the City, the Owner will do, execute, acknowledge and
deliver, all such further acts, agreements, and assurances as may be requested and reasonably necessary for
the full completion and consummation of the purpose contemplated herein. These further acts shall
specifically include, but are not limited to, signing subsequent or additional successive Annexation Petitions
in the event any prior annexation effort is unsuccessful. The Owner warrants and covenants that the Owner
has not and will not subdivide the Subject Property, combine the Subject Property with other real property
not subject to this Covenant, or otherwise manipulate the Subject Property to hinder or impede the City’s
ability to annex the Subject Property, and any attempt to do so will be considered a breach of this Covenant.
This Covenant shall not be construed as prohibiting or inhibiting the subdivision of the Subject Property or
the combination of the Subject Property with any other property; provided, however, upon any such division
of the Subject Property, this Covenant shall apply to any additional properties derived from the Subject
21
3
Property and upon the combination of the Subject Property, or any portion thereof, with any other real
property this Covenant shall apply to the entirety of the resulting combined property, which shall thereafter
be considered the Subject Property, or a portion thereof.
B. The Owner agrees that the obligations contained in this Covenant shall continue in full force
and effect until the earlier of the following: (i) the Subject Property, in its entirety, has been successfully
annexed into, and continuously lies within, the corporate limits of the City; or (ii) the Owner affirmatively
requests in writing that (1) the Subject Property be permanently disconnected from the System, and (2) the
Subject Property, in its entirety, is no longer served by the Utility Services.
C. The Owner is a person eighteen years of age, or older, or any firm or corporation, who or
which is the sole owner of legal title to a present possessory interest in the Subject Property equal to a life
estate or greater (expressly excluding leaseholds, easements, equitable interests, inchoate rights, dower
rights, and future interests). Further, the Owner covenants and warrants that he will not transfer, alienate,
devise, encumber, or otherwise affect title to the Subject Property for a period of seven days from the date
of this Covenant, in order to allow the City time to have this Covenant recorded in the Office of the Register
of Deeds for Oconee County, South Carolina. The Owner will inform any subsequent Owner of (i) the
Subject Property, (ii) any portion of the Subject Property, or (iii) any real property that the Subject Property
is made a part of, that the obligations contained in this Covenant continue and run with the land. A failure
by the Owner to properly inform any successor in interest of the Subject Property of this Covenant shall
not affect the validity or applicability of this Agreement with respect to any successor in interest, and any
such successor in interest shall remain bound by the provisions hereof.
D. T
he Owner agrees that any breach of conditions of the Customer Agreement or any other
agreements associated with the provision of Utility Services made in accordance with this Covenant, shall be
a breach of this Covenant. Such conditions may include, but are not limited to, the following: (i) payment of
applicable connection fees and surcharges as fixed by the City; (ii) general terms, conditions, and policies
upon which Utility Service is made available by the City; and (iii) the payment to the City when due such
water, or sewer or electric charges, taxes, or fees as may be imposed from time to time.
E. The Owner agrees that the effectiveness of this Covenant will continue and survive any
temporary disconnection, interruption, or termination of Utility Services by the City, except for a permanent
termination of Utility Services pursuant to Section 3(B)(ii) above.
4. R
estrictive Covenant . THE OWNER HEREBY IMPOSES UPON THE SUBJECT
PROPERTY FOR THE BENEFIT OF THE CITY A RESTRICTIVE COVENANT REQUIRING
THAT FUTURE OWNERS OF THE SUBJECT PROPERTY, OR ANY PART THEREOF, BE
BOUND BY THE SAME TERMS, CONDITIONS AND COVENANTS AS ARE SET FORTH IN
THIS COVENANT. THIS COVENANT SHALL CONTINUE IN FULL FORCE AND EFFECT
UNTIL THE EARLIER OF THE FOLLOWING: ( I) THE SUBJECT PROPERTY, IN ITS
ENTIRETY, HAS BEEN SUCCESSFULLY ANNEXED INTO AND LIES CONTINUOUSLY
WITHIN THE CORPORATE LIMITS OF THE CITY; OR (II) THE SUBJECT PROPERTY, IN ITS
ENTIRETY, IS NO LONGER BEING SERVED BY UTILITY SERVICES. ANY AND EVERY
FUTURE OWNER OF THE SUBJECT PROPERTY, OR ANY PART THEREOF, IS BOUND BY
THE TERMS CONTAINED IN THIS COVENANT BY ACCEPTANCE OF A DEED TO THE
SUBJECT PROPERTY, OR PORTION THEREOF, THAT IS SUBJECT TO THIS RESTRICTIVE
COVENANT.
5. R
ecordation of Covenant . The Owner hereby expressly agrees and directs that this Covenant and
description of the Subject Property be recorded in the real estate records in the Office of the Register of
Deeds for Oconee County, South Carolina, so as to give record notice to any future prospective purchaser
22
4
of the Subject Property that this Covenant is an obligation upon the land and runs with the land until the
occurrence of either of the two events set forth in the preceding paragraphs.
6. D escription of Property. This Covenant and restrictive covenant apply to the Subject Property as it
is more fully described on the attached Exhibit A.
7. G rant of Right of Way. The Owner grants the City a right -of-way on and through the Subject Property
as reasonably necessary for the City’s operation of the System in order to provide Utility Services to the Subject
Property. In the event a standard grant of right-of-way has not been executed by the Owner before execution of
this Covenant, the Owner agrees, upon request, to execute a standard right-of-way to further document and
describe the specific location and rights associated therewith.
8. G rant of Power of Attorney. In the event the Owner fails to meet the obligations imposed herein
and does not sign any Annexation Petition upon request, the Owner hereby irrevocably appoints the City
Administrator of the City of Westminster, South Carolina, Attorney in Fact for the Owner of the Subject
Property with full power to sign any Annexation Petition upon the request of the City.
9. O wner’s Use of Subject Property . If the Owner changes the current use of the Subject Property to any
different use, the City may, at its option, require additional approvals and conditions for continued Utility
Service thereon.
10. D efault; Remedies . As used in this Covenant, a default of this Covenant occurs immediately upon
any breach, failure or nonoccurrence of any term, condition, obligation, affirmative act, covenant,
representation or warranty. Immediately upon any default by the Owner, the City may, in its sole discretion,
void this Covenant and thereby void any statements, actions or commitments by the City as to providing
Utility Services to the Subject Property. Additionally, upon any default by the Owner, the City may elect to
enforce this Covenant. If any effort to enforce the terms of this Covenant fails for any reason, the City may
thereafter elect to rescind and void this Covenant. In the event this Covenant is rescinded or voided, the City
shall be under no obligation to provide Utility Services or to continue to provide Utility Services to the
Subject Property or any portion thereof. In the event of any default by the Owner of this Covenant, the City
shall be entitled to recover from the Owner the costs and attorneys’ fees incurred by the City as a result of
or in response to the Owner’s default.
11. N o Waiver . The failure of any person or entity having any right, title or interest in the Subject
Property, or any portion thereof, including the Owner and his respective heirs, successors, successors in
title and assigns or the City, to bring an action to enforce this Covenant, shall not operate as a waiver of the
right to do so for any later subsequent violations or the right to enforce any other part of this Covenant at
any future time. The failure of any person or entity having any right, title or interest in the Subject Property,
or any portion thereof, including the Owner and his respective heirs, successors, successors in title and
assigns or the City to exercise or to delay in exercising any right or remedy available hereunder or at law
or in equity shall not operate as a waiver. Notice of default or violation shall not be deemed as a condition
precedent to the exercise of any right or remedy available hereunder or at law or in equity. Should any
person or entity having any right, title or interest in the Subject Property, or any portion thereof, including
the Owner and their respective heirs, successors, successors in title and assigns or the City fail to bring an
action for enforcement of this Covenant or seek any other remedy allowed at law or in equity such shall not
create any liability for the recovery of damages for the failure to so act.
12. R
emedies Cumulative. Every right and remedy provided in this Covenant is distinct from and
cumulative to every other right or remedy under this Covenant or available at law or in equity. The provision
of certain rights and remedies in this Covenant does not abrogate, limit or affect any rights or remedies as
23
5
provided at law or in equity. Every right and remedy may be exercised concurrently, independently or
successively.
13. E xhibits Incorporated by Reference. All exhibits referenced in this Covenant are incorporated
herein as integral parts of this C ovenant and shall be considered reiterated herein as fully as if such
provisions had been set forth verbatim in this Covenant.
14. Co pies . A photostatic or other reproduction of this document shall be as effective, valid and
conclusive as the original.
15. M
odification . The terms of this Covenant may be modified in whole or in part only by a written
instrument signed by the Owner and consented to by the City. Any oral agreement to modify this Covenant
shall be void and of no force and effect.
16. C aptions . The captions and headings of the Paragraphs of this Covenant are for convenience only
and may not be used to interpret or define the provisions of this Covenant.
17. S
everability . In the event that any provision or clause of this Covenant conflicts with any applicable
law, the other provisions of this Covenant shall be given effect as fully as possible without the conflicting
provision, and to this end the provisions of this Covenant are declared to be severable.
18. R eferences Herein. Wherever appropriate, all words herein in the male gender shall be deemed to
include the female or neuter gender, all singular words shall include the plural, and all plural words shall
include the singular.
19. S uccessors and Assigns. The covenants and agreements contained in this Covenant and the
obligations created hereunder shall ensure to the benefit of and be binding on the City, the Owner and all
heirs, successors and assigns of the Owner to the Subject Property, or any part thereof.
20. G overning Law and Forum . The validity, construction and effect of this Covenant shall be
governed by the laws of the State of South Carolina, and the Owner hereby consents to the exclusive
jurisdiction of the courts of the State of South Carolina for resolution of any dispute arising hereunder.
21. S ealed Instrument. Owner agrees that by signing below he intends to place his hands and seals
upon this Covenant and that this Covenant shall be considered in every respect to be a sealed instrument.
22. E ffective Date . This Covenant shall be effective upon the date of the last party affixing his
signature.
[
Remainder of Page Left Blank]
24
6
IN WITNESS WHEREOF, the Owner duly executes this Declaration of Restrictive Covenant as
of the date first written above.
WITNESS #1 OWNER OF SUBJECT PROPERTY
Print Name: Print Name:
WITNESS #2 (Notary Public)
Print Name:
STATE OF SOUTH CAROLINA )
)
COUNTY OF OCONEE ) PROBATE
Personally appeared before me the undersigned witness and made oath that (s)he saw the within
named property owner, sign, seal and as his act and deed, deliver the within Declaration of Annexation
Covenant and that (s)he with the other witness named above witness the execution thereof.
SWORN BEFORE ME this
day of , 20__
Notary Public for South Carolina
Print Name:
My Commission Expires:
_____________________________________________________________________________________
The City hereby accepts the Declaration of Annexation Covenant set forth herein.
CITY OF WESTMINSTER, SOUTH
CAROLINA
City Administrator
25
Exhibit A
Legal Description of Property/Copy of Deed
26
City of Westminster
Annexation Requirement Revisions
Sec. 50.01 - FURNISHING ELECTRICITY, WATER AND SEWER SERVICE.
(E) It shall be the policy of the City to require that the owner of any property located
outside of the City’s corporate boundaries (a “Subject Property”) that requests
a new or upgraded connection to any component ofNew Service (as defined
herein) from the City’s water, or sewer and electric utility system (the “Utility
System”) be required to annex the Subject Property into the City at such time
as the Subject Property is contiguous to the corporate boundaries of the City.
(1) If the Subject Property is contiguous to the City at the time such request is
made, the owner thereof shall be required to submit an annexation petition
to the City prior to the connection to the Utility System being made.
(2) If the Subject Property is not contiguous to the corporate boundaries of the
City at the time such request is made , the owner of the Subject Property
shall be required to execute a covenant to annex the Subject Property into
the City (an “Annexation Covenant”) prior to any connection to the Utility
System being made, requiring the owner of the Subject Property, or any
subsequent owner, to take such action necessary to annex the Subject
Property, any portion thereof, or any larger property to which the Subject
Property was added, into the City at such time as the Subject Property, any
portion thereof, or any larger property to which the Subject Property was
added becomes contiguous to the corporate boundaries of the City. The
Annexation Covenant shall be in a form to be approved by the Council.
(3) The Council may waive this requirement with respect to any property
through the adoption of a resolution that includes specific findings in
connection with the justifications of such waiver and a finding that such
waiver is in the best interest of the City and its citizens.
(4) “New Service” for the purposes of this subsection (E), means (i) a request
to make a new physical connection for a Subject Property to either
component of the Utility System; (ii) a request to reestablish service from
any component of the Utility System for a Subject Property that has
previously established a physical connection to such component of the
Utility System; or (iii) a request to transfer existing service for any
component of the Utility System for a Subject Property to a different party.
27
City of Westminster| PO Box 399 | Westminster, SC 29693 | 864.647.3200 |www.westminstersc.org
To: Members of City Council
From: Reagan Osbon, Assistant City Administrator
Date: 07/20/2023
Westminster Planning Commission
July 17, 2023, Meeting Report
The Westminster Planning Commission met on Monday, July 17, 2023, to consider two items for
recommendation for City Council:
1. Consideration of Zoning Amendment Application 2023-001 by Jonathan Terry for 104
Highlands Ave from R-25 to MFR. The applicant presented site plans and the
Amendment Application to the commission and stated that he planned to develop
duplexes and small, high density single-family units on the 11.5 Acre property. Applicant
intends to sell the homes for about $220,000-$230,000 after development.
The Commission asked questions about greenspace, density of units, and continuity of
adjacent properties. Applicant said that he intended to incorporate greenspace into the
final design plan, likely around the currently abandoned home on the property at the
end of Dickson St. Applicant and commission agreed that current zoning regulations,
even for MFR, would not allow an overly dense development. The MFR designation
would match the zoning of two adjacent HUD supported housing complexes.
The Commission recommended approval of the Application, by a vote of 5-0
(unanimous).
2. Consideration of Zoning Amendment Application 2023-002 by the City of Westminster
for 115 Riley Ave from R-15 to MFR. The City, applicant and owner, has agreed to
convey the property to Westminster Hope ComeUnity, a local nonprofit group,
contingent upon rezoning to MFR. Westminster Hope ComeUnity seeks to use the
vacant lot, formerly the City Recycling Center, to build three small single-family homes
for individuals and families who are without a home for several months while they
prepare for and find a permanent residence. The proposed structures would not serve
as a “homeless shelter” and beneficiaries will have to complete an application, a drug
screening, and have no record of violent crimes (including being a sex offender or
convicted of other serious crimes.
The Commission did not recommend approval of the application to council, and
members cited concerns about location (proximity of a vulnerable population to the
HUD supported housing) and ability of the organization to properly manage the project
(citing inexperience, not intention as a basis).
28
City of Westminster| PO Box 399 | Westminster, SC 29693 | 864.647.3200 |www.westminstersc.org
The Commission did not recommend approval of the Application by a vote of 2-2 (1
abstention).
Additionally, staff updated Commissioners on the status of the Commission Bylaws, Zoning Ordinance,
and Land Development Regulations and presented a rough outline of topics for the remainder of the
Calendar year. A resolution setting dates of the Commission will be presented at the next meeting.
29
30
STATE OF SOUTH CAROLINA )
COUNTY OF OCONEE ) ORDINANCE #2023-09-12-01
CITY OF WESTMINSTER )
AN ORDINANCE TO REZONE A CERTAIN PARCEL IN THE CITY OF
WESTMINSTER FROM R-25 (ONE-FAMILY RESIDENTIAL) TO MFR
(MULTI-FAMILY RESIDENTIAL).
WHEREAS certain property in the City of Westminster on Highlands Avenue and
further identified by Oconee County Tax # 530-21-00-003 is currently owned by Mr.
Jonathan Terry of Westminster, and
WHEREAS, Mr. Jonathan Terry has applied as agent to have this lot rezoned from
R-25 One-Family Residential to MFR Multi-Family Residential in order that he be
given the flexibility to subdivide the property and build additional homes on the
site, and
WHEREAS, the property is currently zoned as R-25, zoning classification that
requires a larger lot sizes and Mr. Terry is requesting a smaller lot size in order to
construct and subdivide additional homes and dwelling units, and
WHEREAS, the property surrounding the site is occupied and zoned residential, and
WHEREAS, the Planning Commission met in order to conduct a public hearing and
to consider the rezoning request, and
WHEREAS, the Planning Commission evaluated the rezoning request in
accordance with the guidelines of City Code found that the rezoning request did
comply with the Comprehensive Plan for the City of Westminster, and
WHEREAS, the Planning Commission voted to recommend to the City Council that
the property be rezoned from R-25 to MFR, and
WHEREAS, the City Council met in order to consider the recommendation from the
Planning Commission and has concurred with the recommendation.
NOW THEREFORE BE IT ORDAINED by the governing body of the City of
Westminster in Council duly assembled and by the authority of the same:
That the boundaries of the zoning districts as indicated on the Official
Zoning Map of the City which is part of the Westminster Zoning Code, be
amended to reflect that the parcel identified as Oconee Tax Map #530-21-
00-003 be rezoned from R-25 Single-Family Residential to MFR Multi-
Family Residential.
31
APPROVED, this 12th day of September 2023
Brian Ramey, Mayor First Reading: August 8th, 2023
Rebecca Overton, City Clerk Second Reading: September 12, 2023
Reviewed by City Attorney and approved as to form:
______________________________
Andrew Holliday, City Attorney
32
6
33
7
34
Oconee County, SC
Parcel ID 530-21-08-003
Neighborhood 9500200 - Westminster T own
Property Address 104 HIGHLAND AVE
Legal Description LOT ON HIGHLAND AVE (12.00AC)
(Note: Not to be used on legal documents.)
Acres 11.5
Class 101 Residential 1 Family
T ax District WESTMINSTER INC (District 40)
Exemptions Agricultural Use
View Map
SEVEN J S PROPERTIES LLC
614 W SPRINGWOOD DR
SENECA, SC 29672
Land Use Acres Square Footage Frontage Depth
F - Farm Market 10.5 500,940 0 0
O - Other 1 43,560 0 0
Style 1 Family (Detached)
Heated Square Feet 3043
Interior Walls Finished
Exterior Walls Comp Bd/Asbestos
Foundation Crawlspace
Attic Square Feet 0
Basement Square Feet 0
Year Built 1942
Roof Type Asphalt Shingles
Heating Type Central Heat
Number Of Bedrooms 0
Number Of Full Bathrooms 1
Number Of Half Bathrooms 0
Value $25,480
Condition Average
Fireplaces\Appliances x2s Outside Masonry Chimney 3
Description Year Built Dimensions/Units Identical Units
Equipment Shed:Steel\no Slab 1961 12x20 / 0 0
Equipment Shed:Steel\no Slab 1961 21x29 / 0 0
Assessed Year 2022
Land Value $46,000
Improvement Value $25,480
Accessory Value $2,530
T otal Value (Market) $74,010
Land Value $0
Improvement Value $0
Accessory Value $2,530
T otal Value (Capped) $2,530
Parcel Information
Owner
Land
Residential Improvement Information
Accessory Information
Valuation
8
35
200ft200ft200ft200ft200ft
Find a Parcel or Address
-83.094 34.658 Degrees
+
–
All rights reserved
Parcel Viewer < HELP >
9
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
115 RILEY STREET
WESTMINSTER, SC 29693
51
STATE OF SOUTH CAROLINA )
COUNTY OF OCONEE ) ORDINANCE #2023-09-12-02
CITY OF WESTMINSTER )
AN ORDINANCE TO REZONE A CERTAIN PARCEL IN THE CITY OF
WESTMINSTER FROM R-15 (ONE-FAMILY RESIDENTIAL) TO MFR
(MULTI-FAMILY RESIDENTIAL).
WHEREAS certain property in the City of Westminster on Highland Avenue and
further identified by Oconee County Tax # 530-21-06-015 is currently owned by the
City of Westminster (“The City”), and
WHEREAS, The City has applied as agent to have this lot rezoned from R-15
One-Family Residential to MFR Multi-Family Residential in order that he be given
the flexibility to subdivide the property and build additional homes on the site, and
WHEREAS, the property is currently zoned as R-15, zoning classification that
requires a larger lot sizes and The City is requesting a smaller lot size to construct and
subdivide additional homes and dwelling units, with the intent of transferring the
property to Westminster Hope ComeUnity, contingent upon rezoning, and
WHEREAS, the property surrounding the site is occupied and zoned residential, and
WHEREAS, the Planning Commission met in order to conduct a public hearing and
to consider the rezoning request, and
WHEREAS, Planning Commission Staff evaluated the rezoning request in
accordance with the guidelines of City Code found that the rezoning request did
comply with the Comprehensive Plan for the City of Westminster, and
WHEREAS, the Planning Commission did not vote to recommend to the City Council
that the property be rezoned from R-15 to MFR, and
WHEREAS, the City Council met in order to consider the recommendation from the
Planning Commission and supersedes the recommendation by voting to approve the
rezoning.
NOW THEREFORE BE IT ORDAINED by the governing body of the City of
Westminster in Council duly assembled and by the authority of the same:
That the boundaries of the zoning districts as indicated on the Official
Zoning Map of the City which is part of the Westminster Zoning Code, be
amended to reflect that the parcel identified as Oconee Tax Map #530-21-
06-015 be rezoned from R-15 Single-Family Residential to MFR Multi-
52
Family Residential.
APPROVED, this 12th day of September 2023
Brian Ramey, Mayor First Reading: August 8th, 2023
Rebecca Overton, City Clerk Second Re ading: September 12, 2023
Rev
iewed by City Attorney and approved as to form:
______
________________________
Andrew Holliday, City Attorney
53
10
54
11
55
12
56
13
57
14
58
100ft100ft100ft100ft100ft
Find a Parcel or Address
-83.091 34.659 Degrees
+
–
All rights reserved
Parcel Viewer < HELP >
15
59
51177551 v2
ORDINANCE NO. __________
AUTHORIZING AN EQUIPMENT LEASE PURCHASE AGREEMENT
IN THE AMOUNT OF NOT EXCEEDING $540,000 BETWEEN THE
CITY OF WESTMINSTER, SOUTH CAROLINA, AND FIRST-
CITIZENS BANK & TRUST COMPANY, TO DEFRAY THE COST OF
ACQUIRING CERTAIN EQUIPMENT; AND OTHER MATTERS
RELATING THERETO.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WESTMINSTER, SOUTH
CAROLINA, AS FOLLOWS:
SECTION 1. Findings and Determinations. The City Council (the “Council”) of the City of
Westminster, South Carolina (the “City”), hereby finds and determines:
(a) The City is an incorporated municipality located in Oconee County, South Carolina, and as
such possesses all powers granted to municipalities by the Constitution and the laws of the State of South
Carolina (the “State”).
(b) Section 5-7-40 of the Code of Laws of South Carolina, 1976, as amended (the “S.C. Code”),
empowers all municipalities to own and possess real and personal property and such municipalities may lease
any such property.
(c) The City desires to enter into a lease-purchase agreement (the “Lease Agreement”) with First-
Citizens Bank & Trust Company (the “Lessor”), in the amount of not exceeding $540,000 for the purpose of
financing the acquisition of the equipment set forth on Exhibit A hereto (the “Equipment”).
(d) The Lease Agreement will not constitute a “financing agreement” and the Equipment will not
constitute an “asset” as such terms are defined in Section 11-27-110 of the S.C. Code. Thus, the amount of the
Lease Agreement will not be included when calculating the City’s constitutional debt limit under Article X,
Section 14 of the Constitution of the State.
(e) The Lease Agreement will be subject to annual appropriation by the Council.
(f) It is in the best interest of the City to acquire the Equipment by entering into the Lease
Agreement with the Lessor. The Lease Agreement will enable the City to purchase the Equipment which will
provide services necessary or useful to the operations of the City government.
SECTION 2. Proposal of Lessor. Attached as Exhibit B is a proposal from Lessor to provide financing
for the Lease Agreement. The City Administrator of the City is hereby authorized to accept such proposal on
behalf of the City.
SECTION 3. Approval of Lease-Purchase Financing. The Council of the City does hereby approve
leasing of the Equipment by the City from the Lessor pursuant to the Lease Agreement. The City Administrator
is authorized to determine the quantity, type and cost of the items of Equipment financed with the Lease
Agreement, provided the total amount of the Lease Agreement shall not exceed $540,000.
60
51177551 v2 2
SECTION 4. Approval of Lease Agreement. Without further authorization, the City Administrator is
hereby authorized to approve the form, terms and provisions of the Lease Agreement, including one or more
repayment schedules, proposed by the Lessor. The City Administrator is hereby authorized, empowered and
directed to execute, acknowledge and deliver the Lease Agreement in the name and on behalf of the City. The
Lease Agreement is to be in the form as shall be approved by the City Administrator, the City Administrator’s
execution thereof to constitute conclusive evidence of such approval.
SECTION 5. Execution of Documents. The Mayor, Mayor Pro-Tempore, City Administrator and
City Clerk are fully empowered and authorized to take such further action and to execute and deliver such
additional documents as may be reasonably requested by the Lessor to effect the delivery of the Lease
Agreement, including any project fund or acquisition fund agreement, in accordance with the terms and
conditions therein set forth, and the transactions contemplated hereby and thereby, and the action of such
officers in executing and delivering any of such documents, in such form as the Mayor, Mayor Pro-Tempore,
City Administrator and City Clerk shall approve, is hereby fully authorized.
SECTION 6. Federal Tax Covenant. The City, as lessee, agrees and covenants that it will not take
any action which will, or fail to take any action which failure will, cause interest components of the payments
to be made under the Lease Agreement to become includable in the gross income of the Lessor or its successors
or assignees for federal income tax purposes pursuant to the provisions of the Internal Revenue Code of 1986,
as amended (the “Code”) and regulations promulgated thereunder in effect on the date of original issuance of
the Lease Agreement, and that it will comply with all applicable provisions of Section 103 and Sections 141
through 150 of the Code and any regulations promulgated thereunder, to maintain the exclusion from gross
income for federal income tax purposes of the interest portion of the payments to be made under the Lease
Agreement; and to that end the City shall:
(a) comply with the applicable provisions of Section 103 and Sections 141 through 150 of the
Code and any regulations promulgated thereunder so long as the Lease Agreement is
outstanding;
(b) establish such funds, make such calculations and pay such amounts in the manner and at the
times required in order to comply with the requirements of the Code relating to required
rebates of certain amounts to the United States; and
(c) make such reports of such information at the times and places required by the Code.
The City Administrator of the City is hereby authorized to adopt written procedures to ensure the City’s
compliance with federal tax matters relating to the Lease Agreement.
The City covenants that the Lease Agreement is designated as a “qualified tax-exempt obligation”
for purposes of Section 265 of the Code relating to the ability of financial institutions to deduct from income
for federal income tax purposes interest expense that is allocable to carrying and acquiring tax-exempt
obligations. The City and all subordinate entities thereof do not anticipate issuing more than $10,000,000 in
tax-exempt obligations in calendar year 2023 other than private activity bonds (other than private activity bonds
which are “qualified 501(c)(3) bonds” as defined in the Code). The City represents that the sum of all tax-
exempt obligations (other than such private activity bonds) issued by the City and all subordinate entities
thereof during calendar year 2023 is not reasonably expected to exceed $10,000,000.
The City will timely file Form 8038-G in accordance with the applicable regulations of the Internal
Revenue Service.
61
51177551 v2 3
SECTION 7. Filings with Central Repository. In compliance with Section S.C. Code Ann. § 11-1-
85, the City covenants that it will file or cause to be filed with a central repository for further availability in the
secondary bond market when requested: (a) a copy of the annual audit of the City within thirty (30) days of the
City’s receipt thereof; and (b) within thirty (30) days of the occurrence thereof, relevant information of an event
which, in the opinion of the City, adversely affects more than five (5%) of the City’s revenue or its tax base.
SECTION 8. Severability. All ordinances, orders, resolutions and parts thereof, procedural or
otherwise, in conflict herewith or the proceedings authorizing the execution of the Lease Agreement are, to the
extent of such conflict, hereby repealed.
SECTION 9. Effective Date; Binding. This Ordinance shall be effective upon its enactment by the
City Council of the City, and shall be binding on the City Council of the City of Westminster, South Carolina,
and its successors.
[Execution page follows]
62
51177551 v2
This Ordinance shall be effective upon its enactment on September 12, 2023.
CITY COUNCIL OF THE CITY OF
WESTMINSTER, SOUTH CAROLINA
(SEAL) ______________________________________
Mayor
ATTEST:
___________________________________
City Clerk
First Reading: August 8, 2023
Second Reading: September 12, 2023
[Execution page]
63
51177551 v2
Exhibit A
Equipment
Equipment Estimated Cost
Two (2) Police Vehicles $90,000
One (1) Public Works Vehicle $44,045
One (1) Water Pickup $46,000
One (1) Sewer Tractor $55,000
One (1) Leaf Truck $277,000
TOTAL ESTIMATED COST $512,045
64
51177551 v2
Exhibit B
Copy of Proposal of First-Citizens Bank & Trust Company
(See attached)
65
66
5KILPO?OGKJ#6JOCMQ?H3 4JJP?H
9KIGJ?H#4JJP?H#<?OC3 -'-1)%
7HVN#;PSZ#8HWH#(#?SHRV#HRK#BH[QLRWV
9YLRW 8HWL 5QSXRW AXQILU BLUOSK 9RK#8HWL
* 7K?J )2(*.(+)+, .-)&)))')) *
+ ;?SICJO )2(*.(+)+- *++&2,1'2- . 4JJP?H )2(*.(+)+1
EGHPXL#5QSUWO\HWOSR#DJNLKXPL#(#F)D)#CXPL'#.+9.*.1+
8HWL BH[QLRW >RWLULVW BUORJOTHP 6HPHRJL
7K?J )2(*.(+)+, .-)&)))'))
-+-.#ESWHPV +)++ +)++ +)++
* )2(*.(+)+- *++&2,1'2- +-&*2+')) 21&0-/'2- --*&+.,')/
-+-/#ESWHPV ,--'4.3)4/ -/',4-)++ 43'2/1)4/
+ )2(*.(+)+. *++&2,1'2- *2&0/1'*- *),&*0)'1) ,,1&)1+'+/
-+-0#ESWHPV ,--'4.3)4/ ,4'213),/ ,+.',2+)3+
, )2(*.(+)+/ *++&2,1'2- *.&*-/')2 *)0&02+'1. +,)&+12'-*
-+-1#ESWHPV ,--'4.3)4/ ,0',/1)+4 ,+2'24-)30
- )2(*.(+)+0 *++&2,1'2- *)&,*/'20 **+&/+*'20 **0&//0'--
-+-2#ESWHPV ,--'4.3)4/ ,+'.,1)42 ,,-'1-,)42
. )2(*.(+)+1 *++&2,1'2- .&+0*'.) **0&//0'-- )'))
-+-3#ESWHPV ,--'4.3)4/ 0'-2,)0+ ,,2'112)//
<UHRK#ESWHPV 1,/'14/)2+ 2/'14/)2+ 0/+'+++)++
5AAF5?#
B9C79AE5<9
C5E9
=FC#AKNO#KD#SKPM#AMCBGO#
?N#?#SC?MHS#M?OC'
;>A5A79
7=5C<9
=FC#BKHH?M#?IKPJO#OFC#
AMCBGO#RGHH#AKNO#SKP'
5QSXRW#;ORHRJLK
=FC#?IKPJO#KD#AMCBGO#
LMKQGBCB#OK#SKP#KM#KJ#
SKPM#@CF?HD'
ESWHP#SM#BH[QLRWV
=FC#?IKPJO#SKP#RGHH#
F?QC#L?GB#?DOCM#SKP#
F?QC#I?BC#?HH#
L?SICJON#?N#
NAFCBPHCB'
/)/3+& %2/'14/)2+ %0/+'+++)++ %1,/'14/)2+
5GOS#KD#>CNOIGJNOCM#+)+,#7;
;?EC#*#KD#*
67
ORDINANCE NO. 09-12-2023-04
AN ORDINANCE TO ESTABLISH A REGISTRATION FOR VACANT
AND ABANDONED BUILDINGS , TO AMEND THE CITY ’S CODE OF
ORDINANCES IN CONNECTION THEREWITH , AND OTHER
MATTERS RELATED THERETO.
NOW THEREFORE, be it ordained by the City Council of the City of Westminster (the
“City Council”), the governing body of the City of Westminster, South Carolina (the “City”), in a
meeting duly assembled as follows:
Section 1 Findings. The City Council hereby makes the following findings of fact in
connection with the enactment of this ordinance (this “Ordinance”):
(1) T he City is a body politic and corporate located in Oconee County, South Carolina,
entitled to exercise all the powers and privileges provided to municipal corporations in the State
of South Carolina.
(2) Vacant properties have a greater potential than occupied properties to cause
significant and costly problems for the City. These properties often require greater levels of service
from law enforcement, codes enforcement, and other City services and, thereby create a financial
burden for the City and detract from the quality of life of the surrounding neighborhoods and the
City as a whole. Vacant buildings are an impediment to neighborhood redevelopment and
rehabilitation, decrease property values, and prevent neighborhood stabilization. Vacant properties
have a greater likelihood of becoming unsightly, structurally unsound, and otherwise dangerous ;
of attracting criminal activ ity, and of otherwise creating a threat to public health, safety, and
welfare of neighboring properties and the general public.
(3) T he difficulty or inability to contact the owners of abandoned properties presents a
significant obstacle in providing effective and prompt enforcement of the provisions of the City of
Westminster Code of Ordinances (the “ City Code ”) as they relate to Vacant Buildings. These
buildings are more often the subject of foreclosure actions by lien holders, which take considerable
time to resolve and further complicate codes enforcement and nuisance abatement efforts.
(4) To the extent that Vacant Buildings are or appear to be abandoned, such buildings
are recognized as an attractive nuisance under the International Property Maintenance Code
adopted by the City and codified by reference at Section 150.08 of the City Code.
(5) In order to protect the public ’s health, safety, and welfare, the City Council has
determined to amend the City Code and implement a Vacant Building registration policy to
establish a method for identifying and managing Vacant Buildings within the City, establishing
the responsibilities of O wners of V acant Buildings and structures, and providing for
administration, enforcement, and penalties.
68
2
Section 2 Am endment of the City Code . Title XV-LAND USAGE; Chapter 150 -
Building Regulations shall be amended as follows to include Chapter 153 – VACANT BUILDING
REGISTRATION.
Chapter 153 – VACANT BUILDING REGISTRATION
§ 153.01 – DEFINITIONS
Unless otherwise expressly stated, the following terms s hall, for the purposes of this
Chapter, have the meanings shown in this Section. Where terms are not defined, through
the methods authorized by this Section, such terms shall have ordinarily accepted meanings
such as the context implies.
Building Report m
eans the report of the [codes enforcement officer or fire marshal] with
respect to a Vacant Building prepared pursuant to § 153.02(D) of this Chapter.
Citation means a charge or formal written accusation of vio
lation of a municipal, state or
federal law, regulation or ordinance, including any violations of the International Property
Maintenance Code as adopted by the City.
City means the City of Westminster, South Carolina.
City Code means the City of Westminster Code of Ordinances, as subsequently amended.
Code Violation means violation of any code adopted and/or enforced by the C ity, which
may include but not be limited to the City Code or the IPMC.
Construction Board of Appeals me ans the City of Westminster Construction Board of
Appeals.
Courtesy Regi
stration means notification by mail, phone, fax or email to the code
enforcement officer notifying them of an extended vacancy of 120 days or more of a
primary residence for work, vacation, military, or a medical reason.
IPMC means the most current edition of the I nternational Property Maintenance Code
adopted by the City.
Non-Residential St ructure means any building designed for occupancy for office,
commercial, industrial, three or more residential units, or a combination thereof.
Owner means any person, firm or corporation having a legal or equitable title in the
property; or recorded in the official records of the state, county or municipality as holding
title.
Property means a lot, plot, premises or parcel of land, including the buildings or structures
thereon.
69
3
Rehabilitation Plan means the plan required to be submitted with respect to a Category II
or Category III Vacant Building, as further described in § 153.03(B) of this Chapter.
Registration Fee me ans a fee for the registration of a Vacant Building in accordance with
the terms of this Chapter.
Residential Stru cture means a building designed for occupancy as a single family or two-
family dwelling.
Responsible Local Representative means a person having his or her place of residence or
business office within 45 miles of the Vacant Building and designated by the Property
Owner as the Agent responsible for operating such Property in compliance with the City
Code. For the purposes of this article, the term “Agent” shall refer to the Responsible Local
Representative.
Responsible Part y means any agent, manager, operator, and/or management company of
a Vacant Building, as designated by the Owner.
Secure means a building or portion of a building is closed or locked for entry by normal
means other than boarding.
Unoccupied means a building which is not being used for a legal occupancy.
Vacant Building means any structure built for occupancy of residential, commercial or
industrial uses that is continually unoccupied.
Vacant Building C
ategory means, with respect to each of the following, the classification
of a Vacant Building as:
(A) Category I: No current Code Violations on the Vacant Building or the Property.
1. The building is Secure, not boarded.
2. The building is structurally sound with no Code Violations.
3. The Property is maintained to the minimum requirements of the Code by the
Owner or Responsible Party.
(B) C
ategory II : Minimal Code Violations.
1. The building is boarded and Secure.
2. The building is structurally sound with minor Code Violations related to property
maintenance that do not involve the structure of the Vacant Building.
3. The Property is not regularly maintained.
70
4
(C) Category III: Substantial Code Violations.
1. The building is not Secure or boarded.
2. Structural deficiencies or Code Violations that create risks to health and safety
are evident, or there is a history of criminal activity at the address.
4. Structure is unfit for occupancy.
5. The Property is not maintained.
Vacant Building Plan m
eans a plan containing the information required pursuant to §
153.03 of this Chapter.
§ 153.02 – REGISTRATION OF VACANT BUILDINGS
(A
) Except as provided in subsection (B) below, all Vacant Buildings shall be registered
with the Code E nforcement Official within 120 days of becoming a Vacant Building as
defined in § 153.01. Registration is valid for one year or a pro -rated portion thereof and
must be renewed annually on November 6th or the next closest business day of the 6th falls
on a weekend.
(B) Exemptions from registration:
1. Residential structures that are used as residential rentals and have active
residential rental business license permits, if required;
2. R esidential or Non- Residential Structures actively listed and marketed for
sale or lease by a licensed real estate com pany or managed by a licensed
property management company for not more than one year and that meet
minimum building codes as determined by either the Code Enforcement
Officer or the Fire Marshall;
3. C ommercial or residential structures that have multiple units in which at least
one unit is occupied;
4. Accessory structures not designed for occupancy; and/or
5. Buildings that serve as a primary residence in which the Owner is away for
more than 120 days for work, vacation, military or medical reason; provided,
that the Building and Property is maintained to minimum requirements of the
City Code and the Owner provides a Courtesy Registration.
(C) If any Vacant Building remains Vacant at the expiration of any registration period,
the Owner shall re -register such Vacant B uilding and pay the annual registration and
inspection fees.
71
5
(D) The Owner registering a Vacant Building shall supply the following information
on an authorized form provided by the Code Enforcement Official:
1. Name, address, and telephone number of the Owner;
2. Name, address, and telephone number of the Responsible Party, if any;
3. Name, address, and telephone number of any Responsible Local
Representative, which may be the Responsible Party, if the Owner’s residence
or business address in more than 45 miles from the Vacant Building;
4. Tax parcel identification number of the premise on which the Vacant Building
is situated;
5. The common address of the Vacant B uilding; and
6. A Vacant Building Plan in accordance with § 153.03 of this Chapter.
(E) Following the registration of the Vacant Building, the City’s Code E nforcement
Official shall conduct an inspection of the Property and premises to determine any Code
Violations and to verify the Vacant Building Category.
1. The Code Enforcement Official, as applicable, will provide the Owner of the
Vacant B uilding with a Building Report (i) stating current condition and
apparent use (i.e., Residential Structure or Non -Residential Structure) of the
Vacant Building and Property, (ii) listing any apparent Code Violations, (iii)
stating whether the Vacant Building constitutes a nuisance, and any findings
or reasons therefor; (iv) assigning a Vacant Building Category to the Vacant
Building; and (v) notifying the Owner of the applicable Registration Fee.
2. Within 15 days of receipt of such findings, the Owner may request a
reinspection of the Vacant Building regarding any findings included in the
Building Report, including the applicable Vacant Building Category. Any
such request must be submitted in-writing to the Code Enforcement Official,
as applicable. The decision of the Code E nforcement Official, as applicable
after such reinspection shall be the final decision of the City, subject to an
appeal pursuant to § 153.06 of this Chapter.
(F) All Vacant Buildings must remain Secure and/or boarded in accordance with
§ 150.08 of the City Code.
(G) Upon request by the Code E nforcement Official, the Owner shall post “ No
Trespass” placards on the Property . Additional employment of security services for non-
residential properties for a specified number of hours every day may be required by the
72
6
police chief or his/her designee on the basis of the property history of code or criminal
violations.
(H) The Owner must designate a Responsible L ocal Representative if their place of
residence or business address is more than 45 miles from the Vacant Building. The
responsible local representative shall act as an agent for the Property Owner for purposes
of accepting legal service; however, the Owner remains personally liable in criminal
prosecutions for Code Violations. The Responsible L ocal Representative must be readily
available at the number provided in the event of an emergency or catastrophe.
§ 153.03 – ESTABLISHMENT OF A VACANT BUILDING PLAN
(A) All Owners of Vacant Buildings shall provide the following in a Vacant Building
Plan along with the completed form required pursuant to § 153.02(D) of this Chapter:
1. A site plan of the Property;
2. A layout of the Vacant Building and other structures on the Property, if non -
residential;
3. A plan of action to secure, monitor and maintain the Vacant Building and
Property in conformance with this Chapter.
4. Written consent by the Owner, allowing City officials to enter and inspect the
Property.
(B) Where a Vacant Building is assigned a Vacant Building Category II or III in a
Building Report, the Owner shall submit, or cause to have submitted, a Rehabilitation Plan
within 30 days of receipt of such Building Report. The Rehabilitation Plan shall contain
the following:
1. A plan to make the Vacant Building ready for occupancy with sufficient detail
regarding the proposed repair or rehabilitation of the Vacant Building, and the
timing thereof, to enable the Code E nforcement Official to determine the
adequacy of such plan.
2. For Vacant Buildings that are identified in the Building Report as being or
containing a public nuisance, the Vacant Building Plan shall contain a plan of
action to remedy such public nuisances within not more than [90] days;
3. Owners of Vacant Buildings classified as Vacant Building Category III shall
meet with the Code Enforcement Official and fire marshal/fire chief to review
structural deficiencies and determine a plan to respond to fire or other
emergency, and such fi ndings and recommendations shall be part of the
Rehabilitation Plan.
73
7
(C) A Vacant Building Plan and Rehabilitation Plan, if applicable, shall be subje ct to
the approval of the C ode Enforcement Official , as applicable. The Code E nforcement
Official, as applicable, may reject a Vacant Building Plan or Rehabilitation Plan, or any
term thereof, by providing the Owner with written notification of such rejection, which
shall include the reasons therefor, and may provide suggested revisions that would be
acceptable. In such event, the Owner shall revise the
If the Property is subject to a Vacant Building P lan, including a Rehabilitation Plan, any
conveyance of such P roperty is subject to the terms of the Vacant Building P lan. The
transferee may apply to the C ity to be released from the requirements of such Vacant
Building P lan or Rehabilitation Plan or subject to a revised Vacant Building Plan and
Rehabilitation Plan, if applicable.
§ 153.04 – REGISTRATION FEE FOR VACANT BUILDINGS
(A) Annual R egistration Fees are based on the type of Vacant Building, the applicable
Vacant Building Category, and the number of years that a Vacant Building has remained
continuously vacant (commencing upon the effective date of Ordinance No. [___],
pursuant to which this Chapter was enacted). All fees are due at the time of registration or
renewal.
1. Registration Fees for Non-Residential Structures are as follows:
Year Category I Category II Category III
Initial Registration $50 $50 $50
First Annual Renewal $100 $150 $200
Second Annual Renewal $500 $750 $1,000
Third Annual Renewal $1,000 $1,500 $2,000
Each year thereafter $1,500 $2,250 $3,000
2. Registration Fees for Residential Structures are as follows:
Year Category I Category II Category III
Initial Registration $0 $0 $0
First Annual Renewal $50 $50 $100
Second Annual Renewal $50 $250 $500
Third Annual Renewal $50 $500 $1,000
Each year thereafter $50 $500 $1,000
74
8
3. An annual compliance inspection fee of $50.00, in addition to the Registration
Fee, is required on all Vacant Buildings not exempt pursuant to § 153.02(B).
The fee shall be paid at the time of initial registration or registration renewal
of a Vacant Building.
4. Upon determination that a Vacant Building has not been registered in
accordance with this Chapter, the City may imposed fines in addition to the
annual registration fees in accordance with § 153.05.
(B) The Owner shall pay the applicable Registration Fee within 30 days of receipt of
the Building Report; provided, however, the payment of a Registration Fee shall be stayed
during the pendency of any properly filed appeal pursuant to § 153.06 of this Chapter. The
failure of the Owner to pay a Registration Fee when due shall constitute a violation of this
Chapter, subject to enforcement and penalties pursuant to §153.05 of this Chapter . This
action may result in a lien being placed upon the Property.
(C) The following shall be exempt from the payment of Registration Fees; provided
that the Owner must request an exemption from the City in writing, which request shall
include information satisfactory to the City that one or more of the following conditions
exist:
1. R
esidential or Non- Residential Structures actively listed and marketed for
sale or lease by a licensed real estate company or managed by a licens ed
property management company for more than one year and that meet
minimum building codes;
2. R esidential or Non- Residential Structures that are actively and continually
under renovation for a period of up to one year . If renovations take longer
than one year , the Owner may request an extension of such exemption for
additional six -month periods, subject to an inspection by the C ode
Enforcement Official, as applicable to confirm that renovations remain active
and continuous;
3. Residential or Non- Residential Structures that are in probate and actively
being transferred;
4. Residential or Non- Residential Structures damaged by a fire or other
catastrophic event for a period of up to one year;
5. Vacant Buildings assigned Vacant Building Category I that have not been the
subject of a Citation within the immediately preceding one-year period; and
6. Buildings that are structurally deficient that have been ordered by the C ity to
be demolished and removed, in which the Owner has provided consent to the
City to demolish, and the City has accepted the consent.
75
9
(D) An Owner may seek an e xemptions from a R egistration Fees for special
circumstances not listed in § 153.04(C) by application, in writing, to Construction Board
of Appeals, which shall include the specific justification for the exemption and
documentation substantiating such justification.
§ 153.05 – ENFORCEMENT AND PENALTIES
Upon determination that a n Owner has failed to register a Vacant Building, pay a
Registration Fee, carry out a Vacant Building Plan or Rehabilitation Plan, or otherwise
comply with the provisions of Chapter shall be subject to an ordinance summons and a fine
of up to $500.00 per occurrence, with each day of such non- compliance constituting a
separate occurrence.
§ 153.06 – APPEAL
Any person aggrieved by the requirements of this Chapter or any determination or finding
of the Code E nforcement Official, as applicable hereunder may file a n appeal with the
Construction Board of Appeals. Any such appeal must be made in writing to the Code
Enforcement Official , as applicable, must include the specific requirement, finding, or
determination for which such appeal is sought, and must contain documentation or other
information as may be necessary to support such appeal, and must be made within 30 days
of the date on which the final decision of the C ode Enforcement Official, as applicable
with respect to such requirement, determination, or finding is made. Any person aggrieved
by a final decision issued under this S ection by the Construction Board of Appeals, may
seek relief in any court of competent jurisdiction, as provided by the law.
Section 3 Effective Date. This Ordinance is to be effective as of the date of its second
and final reading. Owners have until [July 31, 2023,] to comply with the terms of the Chapter of
the City’s Code of Ordinances enacted hereby.
Section 4 Miscellaneous.
(a) Affirmation of Findings. It is hereby found and determined that each statement of
fact set forth in this Ordinance is in all respects true and correct.
(b) Severability. If any Section, paragraph, clause or provision of this Ordinance or the
Chapter enacted hereby shall be held invalid, the invalidity of such Section, paragraph, clause or
provision shall not affect any of the remaining provisions of this Ordinance.
(c) Saving Clause. Nothing in this Ordinance shall be construed to affect any suit or
proceeding impending in any court, or any rights acquired or liability incurred, or any cause of
action acquired or existing, under any act or ordinance hereby repealed; nor shall any just or legal
right or remedy of any character be lost, impaired or affected by this Ordinance.
76
10
(d) Inconsistency. All ordinances, resolutions or parts of any ordinances or resolutions
inconsistent or in conflict with the provisions of this Ordinance are here by repealed to the extent
of the conflict or inconsistency.
DONE AND ENACTED IN COUNCIL ASSEMBLED, this 12th day of September 2023.
CITY OF WESTMINSTER, SOUTH CAROLINA
_________________________________________
Brian Ramey, Mayor
[SEAL]
Rebecca Overton, City Clerk
First Reading:
Public Hearing:
Second Reading:
Reviewed by City Attorney and approved as to form
Andrew Holliday, City Attorney
77
RESOLUTION NO. 08-08-2023-01
A RESOLUTION ADOPTING THE EMERGENCY OPERATIONS PLAN AND
EMERGENCY PREPAREDNESS GUIDELINES; AND OTHER MATTERS RELATED
THERETO
WHEREAS, the City of Westminster, South Carolina (the “City”) is a legally constituted
municipal corporation incorporated by Act No. 744 of the Acts and Joint Resolutions of the
General Assembly of the State of South Carolina for the year 1875, and maintains a combined
utility system (the “System”); and
WHEREAS, the City recognizes the threat natural hazards pose to people and property;
and
WHEREAS, undertaking hazard mitigation actions before disasters occur will reduce the
potential for harm to people and property and save taxpayer dollars; and
WHEREAS, an adopted all hazards mitigation plan is required as a condition of future
grant funding of mitigation projects; and
WHEREAS, the City participated jointly in the planning process with the other units of
Government in Oconee County and Anderson County to prepare an all hazards mitigation plan;
and
WHEREAS, the City adopted its Emergency Operations Plan and Emergency
Preparedness Guidelines on November 15, 2022;
WHEREAS, the Multi- Jurisdictional Hazard Mitigation Plan, Anderson and Oconee
County was adopted in March 2023 by the respective governing bodies;
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
Westminster (the “Council”), the governing body of the City, in a meeting duly assembled:
H ereby adopts and incorporates the Multi-Jurisdictional Hazard Mitigation Plan, Anderson
and Oconee County adopted in March 2023 into its Emergency Operations Plan & Emergency
Preparedness Guidelines – amended February 8, 2022, the Mitigation Plan, in its entirety as an
official plan and will undertake annual recording of hazard events, their impact duration and cost.
[Remainder of Page Intentionally Left Blank]
78
DONE AND ADOPTED IN COUNCIL ASSEMBLED, this 8th day of August 2023.
CITY OF WESTMINSTER, SOUTH CAROLINA
_________________________________________
Brian Ramey, Mayor
[SEAL]
Rebecca Overton, City Clerk
79
U.S. Department of Homeland Security
Region 4
3005 Chamblee Tucker Road
Atlanta, GA 30341
May 26, 2023
Ms. Candice Shealey
State Hazard Mitigation Officer
South Carolina Emergency Management Division
2779 Fish Hatchery Road
West Columbia, SC 29172
Anderson and Oconee County Regional Hazard Mitigation Plan
Dear Ms. Candice Shealey:
We are pleased to inform you the Anderson and Oconee County Regional Hazard Mitigation Plan update
complies with the Federal hazard mitigation planning requirements resulting from the Disaster Mitigation
Act of 2000, as contained in 44 CFR §201.6. Effective May 26, 2023, the plan is approved for a period of
five (5) years to May 25, 2028. In addition, the following jurisdictions have met the requirements for
addressing all dam risks listed in the local mitigation plan: Oconee County.
Enclosed is the status of all participating jurisdictions. Approved jurisdictions are eligible applicants
through the State for the following mitigation grant programs administered by the Federal Emergency
Management Agency (FEMA):
• Hazard Mitigation Grant Program (HMGP)
• Flood Mitigation Assistance (FMA)
• Building Resilient Infrastructure and Communities (BRIC)
• Rehabilitation of High Hazard Potential Dams Grant Program (HHPD)
Please note that all funding requests will be evaluated individually according to the program’s specific
eligibility requirements.
The State and all plan participants should be commended for their close coordination and communications
with our office in the review and subsequent approval of the plan. If you or any plan participant need
assistance, please do not hesitate to contact Jake Grabowsky, of my staff, at (202) 856-1901.
Sincerely,
Kristen M. Martinenza, P.E., CFM
Branch Chief, Risk Analysis Branch
FEMA Region 4
Enclosure
Reference:
80
Enclosure: Plan Participant Status List
Attached is the list of participating jurisdictions in the referenced hazard mitigation plan.
Community Name Jurisdiction Status
Date Approved
by FEMA
1) Anderson city APA
2) Anderson County APA
3) Belton city APA
4) Honea Path town APA
5) Iva town APA
6) Oconee County Approved 5/26/23
7) Pelzer town APA
8) Pendleton town APA
9) Salem town APA
10) Seneca city APA
11) Starr town APA
12) Walhalla city APA
13) Westminster city APA
14) West Pelzer town APA
15) West Union town APA
16) Williamston town APA
81
Multi-Jurisdictional Hazard Mitigation Plan
Anderson & Oconee County
March 2023
1
82
TABLE OF CONTENTS
Introduction ................................ ................................ ............. SECTION 1
Planning Process ................................ ................................ ...... SECTION 2
Community Profile ................................ ................................ ... SECTION 3
Hazard Identification ................................ ................................ SECTION 4
Hazard Profiles ................................ ................................ ......... SECTION 5
Vulnerability Assessment ................................ ......................... SECTION 6
Capability Assessment ................................ .............................. SECTION 7
Mitigation Strategy ................................ ................................ ... SECTION 8
Mitigation Action Plan ................................ .............................. SECTION 9
Plan Maintenance ................................ ................................ .. SECTION 10
Plan Adoption ................................ ................................ ......... APPENDIX A
Meeting Times & Rosters ................................ ....................... APPENDIX B
Climate Change ................................ ................................ ...... APPENDIX C
High Hazard Potential Dams ................................ ................. APPENDIX D
Flood Maps ………………………………………………………………………..APPENDIX E
2
83
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
SECTION
1
INTRODUCTION
This section provides a general introduction to the Anderson & Oconee County Multi-Jurisdictional Hazard
Mitigation Plan. It consists of the following five subsections:
❖ 1.1 Background
❖ 1.2 Purpose
❖ 1.3 Scope
❖ 1.4 Authority
❖ Summary of Plan Contents
____________________________________________________________________________________________
1.1 BACKGROUND
Natural and man-made hazards, such as floods, hurricanes, and fires, are a part of the world around us.
In some cases, their occurrence is natural and inevitable, and there is little we can do to control their force
and intensity. In others, we have more power to control the intensity and probability but can never truly
eliminate the threat entirely. In either case, we must consider these hazards to be legitimate and
significant threats to human life, safety, and property.
Anderson County and Oconee County are located in the northwestern part of South Carolina. This area is
vulnerable to a wide range of natural hazards such as hurricanes, flood s, severe thunderstorms, winter
storms, and tornados. It is also vulnerable to man-made hazards, including hazardous materials incidents
and transportation incidents. These hazards threaten the life and safety of residents and have the
potential to damage or destroy both public and private property, disrupt the local economy, and impact
the overall quality of life of individuals who live, work, and vacation within the counties.
While the threat from hazardous events may never be fully eliminated, there is much we can do to lessen
potential impacts upon our community and our citizens. By minimizing the impact of hazards upon our
built environment, we can prevent such events from resulting in disasters. The concept and practice of
reducing risks to people and property from known hazards is generally referred to as hazard mitigation.
Hazard mitigation techniques include both structural measures (such as strengthening or protecting
buildings and infrastructure from the destructive forces of potential hazards) and non-structural measures
(such as the adoption of sound land use policies and the creation of public awareness programs). It is
widely accepted that the most effective mitigation measures are implemented at the local government
level, where decisions on the regulation and control of development are ultimately
FEMA Definition of Hazard Mitigation:
“Any sustained action taken to reduce or eliminate the long-term risk to human life and
property from hazards.”
3
84
SECTION 1: INTRODUCTION
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
made. A comprehensive mitigation approach addresses hazard vulnerabilities that exist today and in the
foreseeable future. Therefore, it is essential that projected patterns of future development are evaluated
and considered in terms of how that growth will increase or decrease a community’s overall hazard
vulnerability.
A key component in the formulation of a comprehensive approach to hazard mitigation is to develop,
adopt, and update a local hazard mitigation plan as needed. A hazard mitigation plan establishes the broad
community vision and guiding principles for reducing hazard risk and, furthermore, proposes specific
mitigation actions to eliminate or reduce identified vulnerabilities.
Both counties and their respective municipalities participating in the Anderson and Oconee County Multi-
Jurisdictional Hazard Mitigation Plan have an existing hazard mitigation plan that has evolved over the
years, as described in Section 2, Planning Process. This update of the Plan draws from the previous plan
to document the efforts of each jurisdiction to incorporate hazard mitigation principles and practices into
routine government activities and functions. At its core, this Plan recommends specific actions to minimize
hazard vulnerability and protect residents from losses to those hazards that pose the greatest risk. These
mitigation actions go beyond simply recommending structural solutions to reduce existing vulnerability,
such as elevation, retrofitting, and acquisition projects. Local policies on community growth and
development, incentives for natural resource protection, and public awareness and outreach activities
are examples of other actions considered to reduce each County’s vulnerability to identified hazards. This
Plan remains a living document with implementation and evaluation procedures established to help
achieve meaningful objectives and successful outcomes over time.
1.1.1 The Disaster Mitigation Act and the Flood Insurance Reform Acts
In an effort to reduce the Nation's mounting natural disaster losses, the U.S. Congress passed the Disaster
Mitigation Act of 2000 (DMA 2000) in order to amend the Robert T. Stafford Disaster Relief and Emergency
Assistance Act. Section 32 2 of DMA 2000 emphasizes the need for state, local, and Tribal government
entities to closely coordinate on mitigation planning activities and makes the development of a Hazard
Mitigation Plan a specific eligibility requirement for any local or Tribal gove rnment applying for federal
mitigation grant funds. In short, if a jurisdiction is not covered by an approved mitigation plan, it will not
be eligible for mitigation grant funds. These funds include the Hazard Mitigation Grant Program (HMGP)
and the Building Resilient Infrastructure and Communities (BRIC) program, both of which are administered
by the Federal Emergency Management Agency (FEMA) under the Department of Homeland Security.
Communities with an adopted and federally approved hazard mitigation pla n thereby become pre -
positioned and more apt to receive available mitigation funds before and after the next disaster strikes.
Additionally, the Flood Insurance Reform Act of 2004 (P.L. 108 -264) created two new grant programs,
Severe Repetitive Loss (SRL) and Repetitive Flood Claim (RFC) and modified the existing Flood Mitigation
Assistance (FMA) program. One of the requirements of this Act is that a FEMA-approved Hazard Mitigation
Plan is now required if communities wish to be eligible for these FEMA mitigation programs. However, as
of early 2014, these programs have been folded into a single Flood Mitigation Assistance (FMA) program.
This change was brought on by new, major federal flood insurance legislation that was passed in 2012
under the Biggert-Waters Flood Insurance Reform Act (P.L. 112-141) and the subsequent Homeowner
4
85
SECTION 1: INTRODUCTION
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Flood Insurance Affordability Act in 2014 that revised Biggert-Waters. These acts made several changes
to the way the National Flood Insurance Program is to operate, including raises in rates to reflect true
flood risk and changes in how Flood Insurance Rate Map (FIRM) updates impact policyholders. These acts
further emphasize Congress’ focus on mitigating vulnerable structures.
The Multi-Jurisdictional Hazard Mitigation Plan has been prepared in coordination with FEMA Region IV
and the South Carolina Emergency Management Division (SCEMD) to ensure that the Plan meets all
applicable FEMA and state requirements for hazard mitigation plans. A Local Mitigation Plan Review Tool,
found in Appendix C, provides a summary of federal and state minimum standards and notes the location
where each requirement is met within the Plan.
1.2 PURPOSE
The purpose of the Anderson and Oconee County Multi-Jurisdictional Hazard Mitigation Plan is to:
❖ Reduce risk to people, property, and the critical infrastructure
❖ Increase public awareness and education about the Plan and the planning process
❖ Maintain grant eligibility for participating jurisdictions
❖ Maintain compliance with state and federal legislative requirements for local hazard mitigation
plans
1.3 SCOPE
The focus of the Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan is on hazards
determined to be “high” or “moderate” risks to the respective Counties, as determined through a detailed
hazard risk assessment. Other hazards that pose a “low” or “negligible” risk will continue to be evaluated
during future updates to the Plan, but they may not be fully addressed until they are determined to be of
high or moderate risk. This enables the participating jurisdictions to prioritize mitigation actions based on
those hazards which are understood to present the greatest risk to lives and property.
The geographic scope (i.e., the study area) for the Plan includes all of Anderson County, Oconee County,
and includes its incorporated jurisdictions and unincorporated areas. Table 1.1 indicates the participating
jurisdictions.
TABLE 1.1: PARTICIPATING JURISDICTIONS IN THE
HAZARD MITIGATION PLAN
Anderson County
Anderson Belton Honea Path Iva Pelzer
Pendleton Starr West Pelzer Williamston
Oconee County
Salem Seneca Wahalla West Union Westminster
5
86
SECTION 1: INTRODUCTION
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
1.4 AUTHORITY
The Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan has been developed in
accordance with current state and federal rules and regulations governing local hazard mitigation plans
and has been adopted by each participating jurisdiction in accordance with standard local procedures.
Copies of the adoption resolutions for each participating jurisdiction are provided in Appendix A. The Plan
shall be routinely monitored and revised to maintain compliance with the following provisions, rules, and
legislation:
❖ Section 322, Mitigation Planning, of the Robert T. Stafford Disaster Relief and Emergency
Assistance Act, as enacted by Section 104 of the Disaster Mitigation Act of 2000 (P.L. 106-390)
❖ FEMA's Final Rule published in the Federal Register, at 44 CFR Part 201 (201.6 for local
mitigation planning requirements and 201.7 for Tribal planning requirements)
❖ Flood Insurance Reform Act of 2004 (P.L. 108-264), Biggert-Waters Flood Insurance Reform Act
of 2012 (P.L. 112-141), and the Homeowner Flood Insurance Affordability Act
❖ National Dam Safety Program Act of 2020, (P.L. 116-260) and the National Program for
Inspection of Non-Federal Dams of 1972 (P.L. 92-367)
1.5 SUMMARY OF PLAN CONTENTS
The contents of this Plan are designed and organized to be as reader-friendly and functional as possible.
While significant background information is included on the processes used and studies completed (i.e.,
risk assessment, capability assessment), this information is separated from the more meaningful planning
outcomes or actions (i.e., mitigation strategy, mitigation action plan).
Section 2, Planning Process, provides a complete narrative description of the process used to prepare the
Plan. This includes the identification of participants on the planning team and describes how the public
and other stakeholders were involved. It also includes a detailed summary for each of the key meetings
held, along with any associated outcomes.
The Community Profile , located in Section 3, provides a general overview of each County, including
prevalent geographic, demographic, and economic characteristics. In addition, building characteristics and
land use patterns are discussed. This baseline information provides a snapshot of the planning area and
helps local officials recognize those social, environmental, and economic factors that ultimately play a role
in determining the county’s vulnerability to hazards.
The Risk Assessment is presented in three sections: Section 4, Hazard Identification; Section 5, Hazard
Profiles; and Section 6, Vulnerability Assessment. Together, these sections serve to identify, analyze, and
assess hazards that pose a threat to Anderson and Oconee County. The Risk Assessment also attempts to
define any hazard risks that may uniquely or exclusively affect specific areas of the Counties.
The Risk Assessment begins by identifying hazards that threaten Anderson and Oconee Counties. Next,
detailed profiles are established for each hazard which build on available historical data from past hazard
occurrences, spatial extent, and probability of future occurrences. This section culminates in a hazard risk
ranking based on conclusions regarding the frequency of occurrence, spatial extent, and potential impact
highlighted in each of the hazard profiles. In the vulnerability assessment, SC SHELDUS loss estima tion
information is used in conjunction with GIS analysis to evaluate known hazard risks by
6
87
SECTION 1: INTRODUCTION
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
their relative long-term cost for expected damages. In essence, the information generated through the
risk assessment serves a critical function as the participating jurisdictions in Anderson and Oconee County
seek to determine the most appropriate mitigation actions to pursue and implement —enabling them to
prioritize and focus their efforts on hazards of greatest concern and structures or planning areas facing
the greatest risk(s).
The Capability Assessment, found in Section 7, provides a comprehensive examination of each County’s
capacity to implement meaningful mitigation strategies and identifies opportunities to increase and
enhance that capacity. Specific capabilities addressed in this section include planning and regulatory
capability, staff and organizational (administrative) capability, technical capability, fiscal capability, and
political capability. Information was obtained through the u se of a detailed survey questionnaire and an
inventory and analysis of existing plans, ordinances, and relevant documents. The purpose of this
assessment is to identify any existing gaps, weaknesses, or conflicts in programs or activities that may
hinder m itigation efforts and to identify activities that should be built upon in order to establish a
successful and sustainable local hazard mitigation program.
The Risk Assessment and Capability Assessment collectively serve as a basis for determining the goals for
the Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan, each contributing to the
development, adoption, and implementation of a meaningful and manageable Mitigation Strategy that is
based on accurate background information.
The Mitigation Strategy, found in Section 8, consists of broad goals as well as an analysis of hazard
mitigation techniques for the jurisdictions participating in the Plan to consider in order to reduce hazard
vulnerabilities. The strategy provides the foun dation for a detailed Mitigation Action Plan , found in
Section 9, which links specific mitigation actions for each jurisdiction to locally assigned implementation
mechanisms and target completion dates. Together, these sections are designed to make the Pla n both
strategic, through the identification of long -term goals, and functional, through the identification of
immediate and short-term actions that will guide day-to-day decision-making and project implementation.
In addition to the identification and pr ioritization of possible mitigation projects, emphasis is placed on
the use of program and policy alternatives to help make each County less vulnerable to the damaging
forces of hazards while improving the economic, social, and environmental health of the community. The
concept of multi -objective planning was emphasized throughout the planning process, particularly in
identifying ways to link, where possible, hazard mitigation policies and programs with complimentary
community goals related to disaster reco very, housing, economic development, recreational
opportunities, transportation improvements, environmental quality, land development, and public health
and safety.
Plan Maintenance, found in Section 10, includes the procedures that the jurisdictions participating in the
Plan will take to ensure the Plan’s continuous long-term implementation. The procedures also include the
manner in which the Plan will be regularly evaluated and updated to remain a current and meaningful
planning document.
7
88
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
SECTION
2
PLANNING PROCESS
This section describes the planning process undertaken to develop the Anderson & Oconee County Multi-
Jurisdictional Hazard Mitigation Plan. It consists of the following eight subsections:
❖ 2.1 Overview of Hazard Mitigation Planning
❖ 2.2 History of Hazard Mitigation Planning in Anderson & Oconee County
❖ 2.3 Preparing the 2023 Plan
❖ 2.4 The Hazard Mitigation Planning Team
❖ 2.5 Meetings and Workshops
❖ 2.6 Involving the Public
❖ 2.7 Involving the Stakeholders
❖ 2.8 Documentation of Plan Progress
2.1 OVERVIEW OF HAZARD MITIGATION PLANNING
Local hazard mitigation planning is the process of organizing community resources, identifying and
assessing hazard risks, and determining how to best minimize or manage those risks. This process
culminates in a hazard mitigation plan that identifies specific mitigation actions, each designed to achieve
both short-term planning objectives and a long-term community vision.
To ensure the functionality of a hazard mitigation plan, responsibility is assigned for each proposed
mitigation action to a specific individual, department, or agency along with a schedule or target
completion date for its implementation (see Section 10: Plan Maintenance). Plan maintenance procedures
are established for the routine monitoring of implementation progress as well as the evaluation and
enhancement of the mitigation plan itself. These plan maintenance procedures ensure that the Plan
remains a current, dynamic, and effective planning document over time that becomes integrated into the
routine local decision-making process.
Communities that participate in hazard mitigation planning have the potential to experience many
benefits, including:
❖ Saving lives and property
❖ Saving money
❖ Speeding up the recovery process following disasters
❖ Reducing future vulnerability through wise development and post-disaster recovery and
reconstruction
44 CFR Requirement
44 CFR Part 201.6(c)(1): The plan shall include documentation of the planning process used to develop the plan,
including how it was prepared, who was involved in the process and how the public was involved.
8
89
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
❖ Expediting the receipt of pre-disaster and post-disaster grant funding
❖ Demonstrating a firm commitment to improving community health and safety
Typically, communities that participate in mitigation planning are described as having the potential to
produce long -term and recurring benefits by breaking the repetitive cycle of disaster loss. A core
assumption of hazard mitigation is that the investments made before a hazard event will significantly
reduce the demand for post -disaster assistance by lessening the need for emergency response, repair,
recovery, and reconstruction. Furthermore, mitigation practices will enable local residents, businesses,
and industries to re-establish themselves in the wake of a disaster, getting the community economy back
on track sooner and with less interruption.
The benefits of mitigation planning go beyond solely reducing hazard vulnerability. Mitigation measures
such as the acquisition or regulation of land in known hazard areas can help achieve multiple community
goals, such as preserving open space, maintaining environment al health, and enhancing recreational
opportunities. Thus, it is vitally important that any local mitigation planning process be integrated with
other concurrent local planning efforts, and any proposed mitigation strategies must consider other
existing co mmunity goals or initiatives that will either help complement or hinder their future
implementation.
2.2 HISTORY OF HAZARD MITIGATION PLANNING IN ANDERSON AND
OCONEE COUNTIES
Each of the 14 participating jurisdictions listed below has a previously adopted hazard mitigation plan. The
Federal Emergency Management Agency (FEMA) approval dates for each of these plans are listed below:
❖ Anderson and Oconee County Hazard Mitigation Plan (2017)
❖ City of Anderson
❖ City of Belton
❖ Town of Honea Path
❖ Town of Iva
❖ Town of Pelzer
❖ Town of Pendleton
❖ Town of Salem
❖ Town of Seneca
❖ Town of Starr
❖ City of Wahalla
❖ Town of Westminster
❖ Town of West Union
❖ Town of Williamston
❖ Unincorporated Anderson County
❖ Unincorporated Oconee County
9
90
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
The existing county -level plan was developed using the multi -jurisdictional planning process
recommended by FEMA. For this plan update the same process was utilized, and all of the jurisdictions
that participated in the previous planning effort have participated in the development of this plan update.
2.3 PREPARING THE 2023 PLAN
Hazard mitigation plans are required to be updated every five years to remain eligible for federal
mitigation funding. To simplify planning efforts, the jurisdictions in Anderson and Oconee Counties
decided to join together to create the Anderson and Oconee County Multi-Jurisdictional Hazard Mitigation
Plan. This allows resources to be shared amongst the participating jurisdictions and eases the
administrative duties of all of the participants.
To prepare the Plan, a team was facilitated under the leadership of James McAdams, Emergency Planner.
The FEMA recommended mitigation planning process (Publication Series 386 and Local Mitigation Plan
Review Guide) was followed and further recommendations were provided by South Carolina Emergency
Management Division (SCEMD) mitigation planning staff.1 The Local Mitigation Plan Review Tool, found in
Appendix C, provides a detailed summary of FEMA’s current minimum standards of acceptability for
compliance with DMA 2000 and notes the location where each requirement is met within this Plan. These
standards are based upon FEMA’s Final Rule as published in the Federal Register in Part 201 of the Code
of Federal Regulations (CFR). The Planning Team (described in Section 2.4) used FEMA’s Local Mitigation
Plan Review Guide (April 2023) for reference as they completed the Plan.
Additionally, the Planning Team determined that it was important to include and analyze some man- made
hazards in the Plan to provide a more comprehensive approach to hazard management within the county.
Although this is not a requirement as per regulations regarding hazard mitigation planning at the state or
federal level, it is a noteworthy step in the direction of an all -hazards approach to risk analysis and
management.
Key elements from the previously approved plan are referenced throughout the document (e.g., existing
actions) and also required a discussion of changes made. For example, all of the risk assessment elements
needed to be updated to include the most recent information. It was also necessary to review the goals
for the county. The Capability Assessment section includes updated information for all of the participating
jurisdictions and the Mitigation Action Plan provides implementation status updates for all of the actions
identified in the previous plans.
The process used to prepare this Plan included twelve major steps that were completed over the course
of approximately 6 months beginning in November 2022. Each of these planning steps (illustrated in
Figure
10
91
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
2.1) resulted in critical work products and outcomes that collectively make up the Plan. Specific plan
sections are further described in Section 1: Introduction.
Over the past five years, each participating jurisdiction has been actively working to implement the
existing plans. This is documented in the Mitigation Action Plan through the implementation status
updates for each of the Mitigation Actions. The Capability Assessment also documents changes and
improvements in the capabilities of each participating jurisdiction to implement the Mitigation Strategy.
FIGURE 2.1: MITIGATION PLANNING PROCESS FOR ANDERSON & OCONEE COUNTY
As is further detailed below, the planning process was conducted through Hazard Mitigation Planning
meetings comprised primarily of local government staff from each of the participating jurisdictions and
advisory stakeholders.
2.4 THE HAZARD MITIGATION PLANNING TEAM
In order to guide the development of this Plan, Anderson County, Oconee County, and their respective
jurisdictions created the Hazard Mitigation Planning Team (also known as the Planning Team). The Hazard
Mitigation Planning Team represents a community-based planning team made up of
11
92
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
representatives from various county and municipal depa rtments and other key stakeholders
identified to serve as critical partners in the planning process.
In February 2022, the Steering Committee, involving Emergency Management representatives
from Anderson and Oconee County met to begin discussing the plan update process and
stakeholders that needed to be involved. The members of this committee were: Josh Hawkins,
Anderson County Emergency Management Director , Scott Krien, Oconee County Emergency
Services Director, and James McAdams, Anderson County Emergenc y Planner. In April 2022, the
Hazard Mitigation Planning Team members engaged in regular discussions as well as held local
meetings and planning workshops to discuss and complete tasks associated with preparing the
Plan. This working group coordinated on a ll aspects of plan preparation and provided valuable
input to the process. In addition to regular meetings, team members routinely communicated and
were kept informed through an e-mail distribution list.
Specifically, the tasks assigned to the Hazard Mitigation Planning Team members included:
❖ Participate in Hazard Mitigation Planning Team meetings and workshops
❖ Provide best available data as required for the Risk Assessment portion of the Plan
❖ Help review the local Capability Assessment information and provide copies of any
mitigation or hazard-related documents for review and incorporation into the Plan
❖ Support the development of the Mitigation Strategy, including the design and
adoption of countywide goal statements
❖ Help design and propose appropriate mitigation actions for their
department/agency for incorporation into the Mitigation Action Plan
❖ Review and provide timely comments on all study findings and draft plan deliverables
❖ Support the adoption of the 2023 Anderson and Oconee County Hazard Mitigation Plan
Table 2.1 lists the members of the Hazard Mitigation Planning Team who were responsible for
participating in the development of the Plan. Team members are listed in alphabetical order by last
name.
TABLE 2.1: MEMBERS OF THE HAZARD MITIGATION PLANNING TEAM
NAME POSITION DEPARTMENT/AGENCY
Chad McBride Sheriff Anderson County Sheriff’s Office
Josh Hawkins Emergency Management
Director
Anderson County Sheriff’s Office
Scott Krien Emergency Services Director Oconee County
Andrew Strickland Assistant City Manager City of Anderson
Alan Sims City Manager City of Belton
Leslie Walker Town Clerk Town of Honea Path
Timothy Taylor Town Clerk Town of Iva
Cheryl Boudreau Municipal Clerk Town of Pelzer
12
93
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Frank Crenshaw Mayor Town of Pendleton
Ed Sokol Mayor Town of Starr
As drafts of the Updated Plan were prepared, the Anderson and Oconee County (HMPC) used email and
website to distribute them to Stakeholders, and requested that they provide comments. The Stakeholders
were requested to provide feedback through email, telep hone or contact POC, James McAdams or a
member of the (HMPC). In addition, drafts were e -mailed to neighboring counties for their review and
feedback.
County, city, and town participation must be defined in order to create a standard for participation in the
Natural Hazard Mitigation Plan. This criterion was established so that county and municipal
representative’s participation was sufficient to add to and comment on the plan.
In order for counties and municipalities to approve the plan and be an official participant of this planning
process, they must satisfy one of the following considerations:
♦ The county EMD Director shall be a member of the Natural Hazard Plan Steering Committee
and provide input and comments on the plan and the planning process.
♦ The mayor, administrator, or manager shall attend a county or public meeting concerning the
Natural Hazard Mitigation Plan and provide input or comments.
♦ The mayor, administrator, or manager shall appoint a city or town employee to attend a
county or public meeting concerning the Natural Hazard Mitigation Plan and provide input or
comments
♦ A HMPC member shall personally discuss and receive on input or comments on the Natural
Hazard Mitigation Plan with a mayor, administrator, manager, or appointed municip al
representative.
♦ A mayor, administrator, or manager, shall send input or comments.
Municipalities were contacted through emails and phone calls explaining the purpose of the Natural
Hazards Mitigation Plan and what was covered at the meetings. Officials were informed through these
NAME POSITION DEPARTMENT/AGENCY
Blake Sanders Mayor Town of West Pelzer
Rockey Burgess
Mayor
Town of Williamston
Lynn Towe Mayor Town of Salem
Scott Moulder City Administrator City of Seneca
Brandon Burton City Administrator City of Wahalla
Linda Oliver Mayor Town of West Union
Kevin Bronson City Administrator City of Westminster
13
94
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
emails and phone calls that the Anderson and Oconee County HMPC needed their input and comments
for the plan. Each municipality satisfied as least one of the above criteria as they did in the previous plan
to be considered an official participant.
2.5 MEETINGS AND WORKSHOPS
The preparation of this Plan required a series of meetings and workshops for facilitating discussion,
gaining consensus, and initiating data collection efforts with the planning team, local government
staff, community officials, and other identified stakeholders. More importantly, the meetings and
workshops prompted continuous input and feedback from relevant participants throughout the
drafting stages of the Plan. In many cases, routine discussions and additional meetings were held
by local staff to accomplish planning tasks specific to their department or agency, such as the
approval of specific mitigation actions for their department or agency to undertake and include in
the Mitigation Action Plan.
Table 2.2 - Meetings & Presentations Concerning the Hazard Mitigation Plan 2.2 - Meetings &
Presentations Concerning the Hazard Mitigation Plan
Date: Activity: Type:
October 4, 2022
Director Hawkins alerted the Anderson County Local
Emergency Planning Committee that the 2023 plan updates
would be open for public comment in the upcoming months.
Public
December 6, 2022 James McAdams, ACSO-EMD Planner presented an update on
the Hazard Mitigation Plan at the Anderson County Local
Emergency Planning Committee Meeting; plan review will start
after kick off meeting.
Public
January 19, 2023 Kickoff meeting conducted at Anderson Emergency Operations
Center and Virtual
Stakeholders SCEMD
Anderson and Oconee
County Leadership
January 27, 2023 Municipal leaders and stakeholders were invited to the Anderson
County Emergency Operations Center to review and discuss the
2023 plan update.
Stakeholders
January 22, 2023 Website and info update to give public the ability to view
meeting dates, log on to website to attend meetings and
important info on the Mitigation Plan.
Stakeholders/
Public
February 1, 2023 First public information meeting Anderson:
Agenda
Mitigation Plan Update/Review
Scope of the Plan
Municipal background
Description of Planning process
Questions/Comments/Next Meeting
Stakeholders/
Public
14
95
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Date: Activity: Type:
February 8, 2023 Second public information meeting Anderson:
Agenda
Mitigation Plan Update
Hazard Identification
Overview types of hazards and locations
Questions/Comments/Next Meeting
Stakeholders/
Public
February 9, 2023 Meeting with Alicia Hunter, Anderson County Director
Development Standards/Land Use and Barry Holcombe,
Anderson County Director Building Standards/Permits; to
discuss NFIP/flood information, building standards other county
building ordinances information.
Stakeholder/
Subject Matter Expert
Wed February 15, 2023 Oconee County HMP
Agenda
Mitigation Plan Update
Overview Mitigation Strategy
Overview Mitigation Objectives and Strategies
Overview Prioritize mitigation action and projects
Questions/Comments/Next Meeting
Stakeholders/
Public
February 16, 2023 Third public information meeting Anderson
Agenda
Mitigation Plan Update/Review
Scope of the Plan
Municipal background
Description of Planning process
Questions/Comments/Next Meeting
Stakeholders/
Public
February 22, 2023 Fourth public information meeting Anderson
Agenda
Mitigation Plan Update
Hazard Identification
Overview types of hazards and locations
Questions/Comments/Next Meeting
Stakeholders/
Public
Tuesday February 28, 2023
Oconee County HMP
Agenda
Mitigation Plan Update
Hazard Identification
Overview types of hazards and locations
Questions/Comments/Next Meeting
Stakeholders/
Public
March 1, 2023 Fifth public information meeting Anderson
Agenda
Mitigation Plan Update
Overview Mitigation Strategy
Overview Mitigation Objectives and Strategies
Overview Prioritize mitigation action and projects
Questions/Comments/Next Meeting
Stakeholders/
Public
15
96
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Date: Activity: Type:
Thursday March 2, 2023 Oconee County HMP
Agenda
Mitigation Plan Update
Individual Municipal Mitigation Strategy
Questions/Comments/Next Meeting
Stakeholders/
Public
March 7, 2023 Anderson and Oconee County meeting via conference call to
discuss any updates to the Mitigation Plan
Stakeholders
Tuesday March 7, 2023
Oconee County HMP
Agenda
Mitigation Plan Update
Individual Municipal Mitigation Strategy
Questions/Comments/Next Meeting
Stakeholders/
Public
March 8, 2023 Sixth public information meeting Anderson
Agenda
Mitigation Plan Update
Individual Municipal Mitigation Strategy
Questions/Comments/Next Meeting
Stakeholders/
Public
Thursday March 9, 2023 Oconee County HMP
Agenda
Mitigation Plan Update
Plan monitoring and maintenance
Schedule for Plan updating
Questions/Comments/Next Meeting
Stakeholders/
Public
March 16, 2023 City of Anderson Municipal Stakeholders and County
Emergency Management met at City Fire Station #3 to review
and discuss and update municipal mitigation strategies for the
2023 plan update.
City of Anderson
Stakeholder
March 20, 2023 Town of Honea Path Municipal Stakeholders and County
Emergency Management met at Town of Honea Path Fire
Station to review and discuss and update municipal mitigation
strategies for the 2023 plan update.
Town of Honea Path
Stakeholders
March 20, 2023 Town of Pendleton Municipal Stakeholders and County
Emergency Management met at County Emergency Management
Office to review and discuss and update municipal mitigation
strategies for the 2023 plan update.
Town of Pendleton
Stakeholders
March 22, 2023 Town of Pelzer West Pelzer Municipal Stakeholders and County
Emergency Management met at County Emergency Management
Office to review and discuss and update municipal mitigation
strategies for the 2023 plan update.
Town of Pelzer West
Pelzer Stakeholders
March 22, 2023 City of Belton Municipal Stakeholders and County Emergency
Management met at City of Belton Fire Station to review and
discuss and update municipal mitigation strategies for the 2023
plan update.
City of Belton
Stakeholders
March 27, 2023 County of Anderson Municipal Stakeholders and County
Emergency Management met at County Emergency Management
Office to review and discuss and update municipal mitigation
strategies for the 2023 plan update.
County of Anderson
Stakeholders
April 5th, 2023 Anderson & Oconee Dams Meeting with SC DHEC County Stakeholders
16
97
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
2.6 INVOLVING THE PUBLIC
An important component of the mitigation planning process involved public participation. Individual
citizen and community -based input provides the entire Planning Team with a greater understanding of
local concerns and increases the likelihood of successfully implementing mitigation actions by developing
community “buy-in” from those directly affected by the decisions of public officials. As citizens become
more involved in decisions that affect their safety, they are more likely to gain a greater appreciation of
the hazards present in their community and take the steps necessary to reduce their impact. Public
awareness is a key component of any community’s overall mitigation strategy aimed at making a home,
neighborhood, school, business, or entire city safer from the potential effects of hazards.
Public involvement in the development of the Anderson and Oconee County Multi -Jurisdictional Hazard
Mitigation Plan was sought using two methods: (1) public survey instruments were made available in hard
copy and online and (2) copies of the draft P lan were made available for public review on county and
municipal websites and at government offices. The public was provided two opportunities to be involved
in the development of the regional plan at two distinct periods during the planning process: (1) during the
drafting stage of the Plan and (2) upon completion of a final draft Plan, but prior to official plan approval
and adoption. A public participation survey (discussed in greater detail in Section 2.6.1) was made
available during the planning process at various locations including on county and municipal websites.
Each of the participating jurisdictions will hold public meetings before the final plan is officially adopted
by the local governing bodies. These meetings will occur at different times o nce FEMA has granted
conditional approval of the Plan. Adoption resolutions will be included in Appendix A.
2.7 INVOLVING THE STAKEHOLDERS
At the beginning of the planning process for the development of this Plan, the project consultant worked
with the County Emergency Management lead to initiate outreach to stakeholders to be involved in the
planning process. The project consultant sent out a list of recommended stakeholders
provided from FEMA Publication 386-1 titled Getting Started: Building Support for Mitigation Planning.
The list of recommended stakeholders from FEMA is found in Appendix C of that publication (Worksheet
#1: Build the Planning Team) and has been included in Appendix B of this plan to demonstrate the wide
range of stakeholders that were considered to participate in the development of this Plan. The County
44 CFR Requirement
44 CFR Part 201.6(b)(1): The planning process shall include an opportunity for the public to comment on the plan
during the drafting stage and prior to plan approval.
44 CFR Requirement
44 CFR Part 201.6(b)(2): The planning process shall include an opportunity for neighboring communities, local
and regional agencies involved in hazard mitigation activities, and agencies that have the authority to regulate
development, as well as businesses, academia, and other non-profit interests to be involved in the planning
process.
17
98
SECTION 2: PLANNING PROCESS
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Emergency Management Coordinator used that list for reference as they invited stakeholders to
participate in the planning process.
In addition to the outreach efforts described above, the Hazard Mitigation Planning Team encouraged
more open and widespread participation in the mitigation planning process by designing and distributing
the Public Participation Survey . In addition to the public, this survey was provided for local officials,
residents, businesses, academia, and other private interests in the county to be involved and offer input
throughout the local mitigation planning process.
Moreover, the Hazard Mitigation Planning Team pushed to get input from stakeholders outside of the
planning area including surrounding counties. Surrounding counties were contacted during the planning
process. When the draft Plan was deve loped, the surrounding counties were asked to review the Plan
and provide suggestions/comments to the consultant’s project manager. These suggestions and
comments were vetted through the Hazard Mitigation Planning Team before they were implemented to
ensure that they met the needs of the communities for whom the Plan was developed. Surrounding
counties that were contacted included: Laurens County, Cherokee County, Chester County, Union County,
York County, and Lancaster County. The email documenting this contact can be found in Appendix D.
2.8 DOCUMENTATION OF PLAN PROGRESS
Progress in hazard mitigation planning for the participating jurisdictions in Anderson and Oconee County
is documented in this plan update. Since hazard mitigation planning efforts officially began in the county
with the development of the initial Hazard Mitigation Plans in the late 1990s and early 2000s, many
mitigation actions have been completed and implemented in the participating jurisdictions. These actions
have helped to reduce t he overall risk to natural hazards for the people and property in Anderson &
Oconee County. The actions that have been completed are documented in the Mitigation Action Plan
found in Section 9.
In addition, community capability continues t o improve with the implementation of new plans, policies,
and programs that help to promote hazard mitigation at the local level. The current state of local
capabilities for the participating jurisdictions is captured in Section 7: Capability Assessment . T he
participating jurisdictions continue to demonstrate their commitment to hazard mitigation and hazard
mitigation planning and have proven this by developing the Hazard Mitigation Planning Team to update
the Plan and by continuing to involve the public in the hazard mitigation planning process
18
99
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
SECTION
3
COMMUNITY PROFILE
This section of the Plan provides a general overview of Anderson County, Oconee County, and their
participating municipalities. It consists of the following four subsections:
❖ 3.1 Geography and the Environment
❖ 3.2 Historical & Geographical Background of Anderson County Municipalities
❖ 3.3 Historical & Geographical Background of Oconee County Municipalities
❖ 3.4 Population and Demographics
❖ 3.5 Housing, Infrastructure, and Land Use
❖ 3.4 Employment and Industry
3.1 GEOGRAPHY AND THE ENVIRONMENT
Within Anderson and Oconee Counties there are 15 municipalities. The overall population of these two
counties is 282,325 according to the 2020 US Census Bureau estimates. The region has both rural and
urban settings with small towns and larger cities spread throughout the area. Anderson and Seneca, the
largest cities have population figures of 29,284 and 8,424, respectively. Many of these small towns do not
have full-time staff or employ a professional planner. They rely heavily on each County government and
the Council of Governments to provide them with technical assistance for planning functions.
Anderson and Oconee County are in the northwest corner of South Carolina. Interstate 85 bisects the
region, providing access to many markets in the southeastern United States. Interstate 85 also provides
easy access to Charlotte and Atlanta. This is one of the fastest growing regions in the United States. This
corridor is characterized by strong economic growth, job creation, and low unemployment. A high quality
of life is reflected in lower cost of living standards, affordable home prices, and proximity to many of the
recreational amenities people desire, including the mountains and the ocean.
The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean is
approximately 200 miles to the east. The climate of this area is relatively mild, with an average
temperature of 61.6 degrees Fahrenheit (Southeastern Regional Climate Center, 2022). This is slightly
lower than other portions of the state such as the Columbia region, which has an average annual
temperature of 63.1, a nd the Charleston region with an average annual temperature of 64.8 degrees.
Precipitation is relatively constant throughout the year with an average of 4.3 inches of rain per month.
The Columbia region averages 4 inches of rain per month while the Charleston region averages 4.2 inches
per month. The growing season is from late March to early November and averages 225 days. The region
is in an area that has a low natural disaster frequency, with an occasional, ice event, tornado or flood
accounting for most events.
19
100
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
FIGURE 3.1: ANDERSON COUNTY ORIENTATION MAP
The geographic location of Anderson County helps to promote various outdoor recreational
opportunities for hiking, biking, fishing, and water activities. Historical features also exist
throughout the county including battlefields, historic homes, museums, and downtown
areas. There are multiple higher education institutions within the county correlating a
working partnership between public and private accredited colleges and universities with
businesses and the community.
20
101
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
3.2 Historical & Geographical Background of Anderson County Municipalities
City of Anderson:
The City of Anderson is in the northwest corner of the state of South Carolina on the Piedmont Plateau.
It is the county seat located in the geographical center of the county and principal city in Anderson
County. The City is ideally located on the busy Interstate 85 corridor, to which much of its economic
growth can be attributed. The City lies on the southern border of Interstate 85 and is approximately
127 miles north of Atlanta, Georgia and 132 miles south of Charlotte, North Carolina. The City
encompasses approximately 14 square miles and is located in the geographical center of the county.
The I-85 corridor from Atlanta to Charlotte is now known as one of the nation’s hottest growth areas.
Anderson County, South Carolina lies midway between Atlanta, Georgia and Charlotte, North Carolina.
This stretch of highway is one of the heaviest traveled highways in the southeast. Business leaders and
development officials in Anderson have taken advantage of this asset, and visible progress is the result.
Anderson County was ranked 14t h out of 50 as one of the “Hottest American cities for business
location,” (based on a survey of leading site consultants) according to the January 2001 issue of
Expansion Management.
Anderson is a major contributor to the success of the upstate. Anderson offers all of the basics upon
which to build a thriving economy, including affordable land, a good transportation system,
infrastructure, and many recreational amenities. In June 2000, Anderson County was one of only ten
communities to be designated an All -America City by the National Civic League. The Anderson
community offers the feel of small-town living with the attractions and business opportunities of larger
cities only a short drive away (City of Anderson, SC, 2022).
City of Belton:
Belton was charte red in 1855 soon after the Columbia and Greenville Railroad was built. It soon
became a junction point of the C & G, the Piedmont and Northern and the Blue Ridge (Southern
Railway). With 36 passenger trains serving the town. The city is still served today by two railroads: the
Greenville & Western Railway and the Pickens Railway.
The city is at the junction of four highway arteries with connections to I-385 in Greenville County, I-26
in Laurens County and I-85 in Anderson and Greenville. Anderson is only 15 minutes away and its only
30 minutes to downtown Greenville. Far enough away for Belton to retain its small -town ambiance
and friendliness, but close enough to the big cities for any cultural, educational, work or shopping
experience anyone would wish.
With a population of 4,400 it is the second largest town in Anderson County. It is unique in having a
thriving downtown business district, the historic Town Square, which is undergoing a $1,000,000.00
revitalization. This has been a cooperative effort between the state, the county, the city and local
21
102
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
organizations. In fact, the local organizations have provided most of the work and much of the money.
This is indicative of the involvement of the people in the community that makes Belton a great place
to live.
There are many other successful businesses, as well as many historic sites in the city or area which is
located on the S.C. National Heritage Corridor. Historic residential areas are within walking distance of
the Town Square. One of these, Brown Ave., particularly reflects small town “Old South” charm and
appearance. The symbol for Belton is the Standpipe. This is a 155′ tall, concrete reinforced water tank
with a capacity of 165,000 gallons which was built in 1909. It towers over the city and has the
appearance of a medieval castle tower. There are only three remaining in SC, and this is the tallest.
The city is home to two elementary and one middle school, with the high school being only 10 minutes
away. Other cultural and educational facilities are th e Belton Center for the Arts, the Belton Depot,
Ruth Drake Museum and a new branch library.
Belton has the council form of government with six council members and a mayor. Under this form,
the mayor and each council member have the same authority. A city a dministrator is employed to
carry out the council’s policies, oversee day to day operations and supervise city employees. The mayor
and the council members serve for four-year staggered terms. While council members must reside in
the ward they represent, all voters vote for all council members and the mayor. This results in all areas
of the town being equally represented, but also ensures that each member of the council is responsive
to the needs of all citizens (City of Belton, 2022).
Town of Honea Path:
A water stop on the Greenville and Columbia Railroad in the 1850s developed into a town whose name
origin is uncertain. Honea Path may be misnamed for William Honey, an early landowner and trader,
or it may be double -named by Cherokee Indians, with “Honea” being an In dian name for “path”
according to folklore. When the town was chartered in 1885, it was referred to as Honey Path in three
different places, and early wills and deeds also bear the Honey Path name. However, in 1917 the town
was incorporated under the name Honea Path and it has gone by that name ever since.
Located on the Anderson -Abbeville county line, Honea Path became a cotton mill town. Chiquola
Manufacturing Company commenced operations in 1903 and has remained the economic mainstay.
The mill’s early em ployees included future U.S. senator Olin D. Johnston, who went to work as a
sweeper in the mill at age eleven. In 1934 Honea Path was the site of one of the most infamous events
in American labor history. Chiquola mill hands joined the general strike that swept the upstate that
summer, which badly divided the community. On the morning of September 6, later dubbed “Bloody
Thursday,” strikers and their supporters gathered to prevent strikebreakers from entering the mill.
Fighting broke out, and gunfire erupt ed. In less than five minutes, six strikers were dead and more
than a dozen lay wounded. Under military guard, the Chiquola Mill reopened the
22
103
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
following Monday. On Memorial Day 1995, a small granite monument was erected in a Honea Path
park to commemorate the tragic event.
As the town entered the twenty -first century, the Chiquola Mill continued as Honea Path’s largest
employer. However, the town had diversified its economy somewhat. Plants opened nearby that
produced synthetic fibers, linens, lady’s spor tswear, shipping containers, and medical equipment.
Among the town’s claims to fame is its Carnegie Library, built in 1908. Honea Path is the smallest town
in the nation with a Carnegie Library, which remains in use as a branch of the Anderson County Library
(The Town of Honea Path, 2022).
Town of Iva:
The Town of Iva, incorporated in 1904, is located in southern part of Anderson County. Iva, once a
shipping station and busy hub for railroad commerce, is a fascinating small -town rich in history and
heritage.
Iva, SC is located in the southern part of Anderson County and is populated by friendly folks who are
proud of their rural heritage and progressive town. Come on over and enjoy the many lakes and rivers
that are a part of our area and see why Iva is known as the "Gateway to the Fresh Water Coast." (Town
of Iva, 2022).
Town of Starr:
Starr is located in Anderson County, south of the City of Anderson on SC 81. The town was originally
named Twiggs, but when the Savannah Valley Railroad was completed in 1884, the name was changed
to Starr Station in honor of a popular engineer who drove the train through town. Anderson is the
largest city near Starr (Town of Starr, 2022).
Town of Pendleton:
Pendleton, SC is a small town in Anderson County, SC. The town was founded in 1790 and is the largest
historic area in the entire United States. The town boasts lovely historic homes and plantations, a town
square around a village green, and one of the friendliest populations found anywhere! Just four miles
from Clemson University, Pendleton offers a combination of History, Education, Friendship and
Laughter! (Town of Pendleton, 2022).
Town of Pelzer:
Pelzer is located in eastern Anderson County on the Saluda River. The town's history is linked with that
of Pelzer Manufacturing Company, which began textile production in the late 1880s. The company
bought the very first generators made by the General Electric Company and was the first factory in the
country to have incandescent lights. Anderson is the largest city near Pelzer. In 2015, Pelzer annexe d
commercial business and about 550 houses, raising the population to approximately 600 residents
(Independent Mail, 2022).
23
104
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Town of West Pelzer:
West Pelzer has a rich history as a healthy place to live, work, and play. We celebrate where we were,
where we are currently, and where we are going. West Pelzer is forever being revitalized, rejuvenated,
and re-energized through new businesses and growth of our core values and vision.
West Pelzer has a population of approximately 969, and is located roughly 30 minutes away from many
major cities – including Greenville, Anderson, and Easley – in the heart of upstate South Carolina. As a
progressive municipality based on building relationships and community, we strive to be an integral
part of both our residents’ lives and Anderson County as a whole. Being situated so closely to
interstates 85 and 385 also allows for easy access to many larger key interstates, such as I-20, I-40, and
I-26 (Town of West Pelzer, 2022).
Town of Williamston:
Located in the Foothill s of the Blue Ridge Mountains in the scenic Upstate, Williamston is a thriving
area with industrial, commercial, and tourist activity. It is located close to the I -85 business corridor
and metropolitan areas. Williamston is 15 minutes from Greenville or An derson, two hours from
Atlanta or Charlotte, and four hours to the beach or the mountains. The city’s climate boasts 248 days
of sunshine, 49 inches of precipitation, and a comfortable average temperature of 64 degrees (Town
of Williamston, 2022).
24
105
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Figure 3.2 Municipality Area Background - Oconee County Map
25
106
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
3.3 Historical & Geographical Background of Oconee County Municipalities
Town of Salem:
Salem is located in the northeast corner of Oconee County, just off Highway 11, and serves as the
gateway to Lakes Jocassee and Keowee (Town of Salem, 2022).
City of Seneca:
Seneca, a railroad town, was named for a 1700’s Indian village Esseneca located on the banks of the
nearby Seneca River. The City, chartered in 1874 as “Seneca City”, dropped “City” from its name in
1906 (City of Seneca, 2022). Nestled in the Foothills of the majestic Blue Ridge Mountains, Seneca is
home to residential and co mmercial properties listed on the National Register of Historic Places.
Dubbed “The City of Opportunity” at its founding, Seneca still claims its title. With the cool waters of
pristine Lake Keowee, Lake Jocassee, and Lake Hartwell nearby, the area offers many recreational
opportunities. Favorably positioned between Atlanta, Georgia, and Greenville, South Carolina, just
minutes away from Clemson University, Seneca and Oconee County have gained national acclaim for
its natural beauty, quaint towns, antique s hopping and as a favorite destination for history buffs and
outdoor enthusiast alike (City of Seneca, 2022).
City of Walhalla:
Walhalla, South Carolina is the county seat of Oconee County in the upstate of South Carolina. Today,
Walhalla is a southern town with historical homes, churches, and the Walhalla Civic Auditorium where
regional and local theater events are held. Walhalla is located just minutes away from the wide variety
of activities Oconee County and the surrounding areas have to offer, including an abundance of hiking
and mountain biking trails, numerous waterfalls, Stumphouse Tunnel, the Chattooga River, the Blue
Ridge Mountains, Clemson University, and more (City of Walhalla, 2022).
Town of West Union:
Located between Seneca and Walhalla, people are attracted to West Union for its shoreline on Keowee
Key (West Union, 2022).
City of Westminster:
The City of Westminster is a small town in Oconee County along the foothills of the Blue Ridge
Mountains. It's full of charm with quaint shops along its historic Main Street. Our residents enjoy a
leisurely paced lifestyle, and a wide variety of occupational and recreational opportunities.
Westminster is a great place to visit, but it’s even a nicer place to live and work. With award winning
schools, a small-town feel, and a progressive plan for continued renewal, it offers families and retirees
a perfect place to call home (City of Westminster, 2022).
26
107
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Climate
The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean
is approximately 200 miles to the east. The climate of this area is relatively mild, with an average
temperature of 61.6 degrees Fahrenheit (Southeastern Regional Climate Center, 2022). This is slightly
lower than other portions of the state such as the Columbia region, which has an average annual
temperature of 63.1, and the Charleston region with an average annual temperature of 64.8 degrees.
Precipitation is relatively constant throughout the year with an average of 4.3 inches of rain per month.
The Columbia region averages 4 inches of rain per month while the Charleston region averages 4.2
inches per month. The growing season is from late March to early Nov ember and averages 225 days.
The region is in an area that has a low natural disaster frequency, with an occasional, ice event, tornado
or flood accounting for most events.
3.4 POPULATION AND DEMOGRAPHIC
Area Population, Households, Median Incomes by County.
The following tables show the population, households and median household income for the two -
county region and their municipalities. Additional detailed census information is identified in the Social
Vulnerability section.
Table 3.1: Population by County.
County Population Population 65+ (%) Households Median Household
Income
Anderson 203,718 18.4% 78,636 $53,598
Oconee 78,607 24.1% 32,440 $49,691
United States Census Bureau, 2020.
27
108
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Table 3.2 - Population by Municipality
County Municipality Population
Anderson County City of Anderson 29,284
City of Belton 4,436
Town of Honea Path 3,753
Town of Iva 1,177
Town of Starr 149
Town of Pendleton 3,245
Town of Pelzer 1,653
Town of West Pelzer 1,049
Town of Williamston 4,219
Oconee County Town of Salem 175
City of Seneca 8,424
City of Walhalla 4,377
Town of West Union 319
City of Westminster 2,543
United States Census Bureau, 2020.
Table 3.3 County Demographics.
Anderson County Oconee County
Total Population: 203,718 79,203
Race:
White 163,178 (80.1%) 70,570 (89.1%)
Black/African American 33,206 (16.3%) 6,019 (7.6%)
Hispanic/Latino 8,964 (4.4%) 4,673 (5.9%)
American Indian and
Alaska Native
815 (0.4%) 317 (0.4%)
Asian 2,445 (1.2%) 713 (0.9%)
Two or More Races 4,074 (2.0%) 1,584 (2.0%)
Civilian Labor Force (ages
16+, %): 60.2% 54.5%
Employed* 86,686 32,885
Unemployed* 3,343 1,238
Unemployment Rate (%)* 3.7% 3.6%
28
109
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Median Household Income: $53,598 $49,691
Persons in Poverty (%): 14.0% 11.1%
Households: 78,636 32,440
Persons over 65 (%): 18.4% 24.1%
United States Census Bureau, 2020.
Table 3.4 County Employment Information
Anderson County Oconee County
Year Employed Unemployed Unemployment
Rate
Employed Unemployed Unemployment
Rate
2021 86,686 3,343 3.7% 32,885 1,238 3.6%
2020 83,340 5,100 5.8% 32,421 1,770 5.2%
2019 86,575 2,360 2.7% 33,208 933 2.7%
2018 85,287 2,807 3.2% 32,769 1,123 3.3%
2017 84,199 3,377 3.9% 31,937 1,436 4.3%
2022 South Carolina Department of Employment and Workforce, Community Profile
3.5 Housing, Infrastructure, and Land Use
Transportation
Anderson and Oconee are in the northwest corner of South Carolina. Interstate 85 bisects the
region, providing access to many markets in the southeastern United States. Interstate 85 also
provides easy access to Charlotte and Atlanta. This is one of the fa stest growing regions in the
United States. This corridor is characterized by strong economic growth, job creation, and low
unemployment. A high quality of life is reflected in lower cost of living standards, affordable
home prices, and proximity to many o f the recreational amenities people desire, including the
mountains and the ocean. There are several major highways that travel through Anderson and
Oconee County including US Highways 29, 76, and 11 US Highway 29 cuts across the eastern -
portion of Anderso n county from south to northeast while US Highway 76 runs south to
northwest, and the two intersect in the City of Anderson. US Highway 11 travels from southwest
to northeast in Oconee county. Anderson and Oconee county both have small cargo airports.
Both airports services local and private aircrafts along with general aviation airports. Flight
instruction is also available at the airport. Rail service in Anderson and Oconee county is
provided by CSX Transportation and Norfolk Southern Corporation which op erate the first and
second longest track routes in the state, respectively. . Bus transportation service is provided
along multiple routes throughout the city and adjacent areas. The Anderson Area Regional
Transit Agency offers public bus service throughout the City of Anderson.
Utilities
29
110
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Electrical power in Anderson County is provided by Duke Energy, Blue Ridge Electric
Cooperative, and Laurens Electric Cooperative. Oconee County is provided electrical power by
Duke Energy, Blue Ridge Electric Coop erative, Gibson Electric and Hart Electric Membership
Corporation.
Anderson Regional Joint Water System (ARJWS), is a partnership of rural and municipal water
districts devoted to providing a high -quality, clean, safe, reliable, economical flow of treat ed
water to its wholesale customers in Anderson and Pickens counties. Anderson Regional Joint
Water System provides water to eighteen water systems throughout Anderson County. There
are four Utility Companies in Oconee County, South Carolina, serving a pop ulation of 75,926
people in an area of 627 square miles. The four companies are Blue Ridge Electric Cooperative,
Keowee Key Utility System, Pioneer Rural Water District and Salem Water Department. There
is 1 Utilities per 18,981 people, and 1 Utilities per 156 square miles. In South Carolina, Oconee
County is ranked 22nd of 46 counties in Utility Companies per capita, and 20th of 46
counties in Utility Companies per square mile.
Community Facilities
There are a number of public buildings and community facilities located throughout Anderson
County. According to the data collected for the vulnerability assessment (Section 6.3.3), there
are 52 schools, 36 fire stations, 9 law enforcement stations, 1 hosp ital, and 1 Emergency
Operations Center within Anderson county.
The Anderson hospital is the AnMed Health Medical Center a 461 -bed acute care hospital
located at 800 N. Fant St. in Anderson, South Carolina. The Medical Center is the anchor facility
for AnMed Health, South Carolina's largest independent, not -for-profit health system. AnMed
has an emergency department, an intensive care unit, geriatric psychiatric services, a joint care
program, cardiology services, inpatient rehabilitation, and a sleep cen ter. Other services
provided include open heart surgery, vascular surgery, general surgery, bariatric surgery,
emergency/trauma medicine, a stroke/neurological center, and diagnostic MRI, CT and
laboratory medicine. Other facilities located at AnMed Health's medical center campus include
Pediatric Therapy Works, a speech, occupational and physical therapy program for children; and
CareConnect, a walk -in facility that treats non -life-threatening ailments such as influenza,
broken bones and minor nosebleeds. AnMed operates additional medical facilities throughout
the county.
The county also currently operates five school districts. Higher education programs are also
available from institutions including Anderson University and Tri County Technical College.
Anderson County Public Library system operates nine library branches throughout the county
and a Bookmobile.
Anderson Parks and Recreation System maintains numerous community and regional parks
throughout the county. There are also additional federal recreational facilities located along lake
Hartwell. Anderson County offers a variety of recreational activities throughout the county.
There are many parks that offer biking, hiking, fishing, boating, picnicking, camping,
30
111
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
playgrounds, and outdoor concerts. Va rious lakes provide outdoor opportunities for boating,
fishing, picnicking, and canoe/kayaking. Boat ramps and pontoon sites are available at certain
park and lake locations in the county. such as ball parks, playing fields, community centers,
recreation c enters, trails/greenways, lake access. The famous “Bass Masters Classic” fishing
tournament is held on Lake Hartwell in Anderson County.
Oconee county also has a number of public buildings and community facilities located
throughout the County. According to the data collected for the vulnerability assessment (Section
6.3.3), there are 22 schools, 13 fire stations, 6 law enforcement stations, 1 hospital, and 1
Emergency Operations Center within Oconee county. Oconee County has one hospital facility.
Prisma Health Oconee Memorial Hospital has been caring for the residents of the greater
Oconee County community since 1939. Oconee Memorial Hospital consists of a 169-bed hospital
featuring a range of inpatient and outpatient services and a host of community -based services.
There are additional medical facilities located throughout each county’s municipalities.
The Oconee County Emergency Services Fire Division is comprised of thirteen all volunteer fire
departments, three municipal fire departments, and one s pecial tax district fire department.
Together these fire departments are home to more than 450 volunteer firefighters. These
volunteers are supported by a workforce known as Station 21. Station 21 consists of both full -
time personnel and part-time personnel. The full-time personnel include Command level staff,
Administrative personnel, and Suppression personnel. The part -time staff assists with the day -
to-day operations of each department. These personnel help to ensure that each department is
always prepared to respond to your emergency should the need ever arise.
Oconee County Public Library operates four branch libraries (Walhalla, Westminster,
Seneca and Salem, throughout the county and a Bookmobile. Oconee Parks and Recreation
System maintains numerous community and regional parks throughout the county.
There are also additional federal recreational facilities located along Lake Hartwell.
Land Use
Land use and development patterns in Anderson and Oconee County are the result of a complex
interaction of demographic trends, economic circumstances, and social attitudes. Technological
changes in areas such as transportation and construction, as well as the availability and cost of
natural resources, including land, water, and ene rgy, have also helped shape existing
development patterns.
The forces that influence land development are constantly evolving. Consequently, factors
impacting forms of land use are dramatically different today from those that shaped land use
patterns in t he past. Lifestyle preferences, size and configuration of households, levels of
personal income, available transportation modes, and the composition of the economy are a
few of the variables responsible for the current geographic distribution of land use and activities.
As both counties grow and continue to develop, more and more land is changing from farmland
and woodland to residential, commercial, and industrial use; supported by more roads, schools,
churches, and other public and semi -public uses. Local land use and associated regulations are
31
112
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
further discussed in Section 7: Capability Assessment.
3.4 EMPLOYMENT AND INDUSTRY
Agriculture was the original mainstay of Anderson and Oconee County’s economy, but industrial
development started with the start of textile mills in the early 1800s which led to the growth of
the textile industry. As traditional textiles began their decline in the mid -1900s, the county’s
industrial base broadened, eventually making it one of the most internationally diverse locations
for business in the nation. The manufacturing industry in Anderson and Oconee region has
grown to include automotive manufacturing suppliers, plastics, packaging, metalworking, and
distribution.
Today, Anderson and Oconee County have a diverse economy with large industrial companies
including international companies. Milliken, Michelin North America, Bosh, Electrolux Major
Appliances North America, First Quality Tissue SE, LLC,; Glen Raven, Inc; a ll operate within
Anderson and Oconee county bringing jobs and economic revenue to the area. Localized
employers also operate within the county and provide numerous jobs to residents. AnMed
hospital system is also a major employer within the county as along with county school system.
Economic growth is occurring within both counties and is projected to continue from an
economic and population perspective.
References
32
113
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
City of Anderson. (2022, March 1). About. Retrieved from City of Anderson Website:
http://www.cityofandersonsc.com/
City of Belton. (2022, March 1). History. Retrieved from City of Belton Website:
https://cityofbeltonsc.com/public-buisnesses/
City of Seneca. (2022, March 1). About Seneca. Retrieved from City of Seneca Website:
http://www.seneca.sc.us/AboutSeneca.aspx
City of Starr. (2022, March 1). Starr, South Carolina. Retrieved from SciWay Website:
https://www.sciway.net/city/starr.html
City of Walhalla. (2022, March 1). History of Walhalla. Retrieved from City of Walhalla Website:
https://www.cityofwalhalla.com/about-walhalla/history-of-walhalla/
City of Westminster. (2022, March 1). Home. Retrieved from City of Westminster Website:
https://westminstersc.org/
The Independent Mail . (2022, March 1). Pelzer Town Council Approves Annexation. Retrieved from The
Independent Mail Website : http://archive.independentmail.com/news/local/pelzer-town-council-
approves-annexation-ep-1195216106-347554681.html
Town of Honea Path. (2022, March 1). History. Retrieved from Town of Honea Path Website:
https://honeapathsc.com/history/
Town of Iva. (2022, March 1). Town of Iva. Retrieved from GoverMeta Website:
https://www.govermeta.com/US/Iva/161055104032679/Town-of-Iva
Town of Pendleton. (2022, March 1). History. Retrieved from Town of Pendleton Website:
https://townofpendleton.org/history/
Town of Salem. (2022, March 1). Home. Retrieved from Town of Salem Website: http://salemsc.us/
Town of West Pelzer. (2022, March 1). About Us. Retrieved from Town of West Pelzer Website:
https://westpelzer.com/index.php/about-us/
Town of West Union. (2022, March 1). West Union. Retrieved from Visit Oconee Website:
https://visitoconeesc.com/visit/west-union/
Town of Williamston. (2022, March 1). About Williamston, SC. Retrieved from Town of Williamston:
http://www.williamstonsc.us/about/
United States Census Bureau. (2022, February 14). Anderson County, South Carolina.
33
114
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
https://www.census.gov/quickfacts/fact/table/andersoncountysouthcarolina/BZA115219
United States Census Bureau. (2022, February 14). Oconee County, South Carolina.
https://www.census.gov/quickfacts/fact/table/oconeecountysouthcarolina/AGE775219#AGE7752
19
Western Regional Climate Center. (2022, March 1). Average of Average Temperature. Retrieved from The
Western Regional Climate Center Website: http://www.wrcc.dri.edu/cgi-bin/cliMAIN.pl?sc0170
Western Regional Climate Center. (2022, March 1). Total of Precipitation. Retrieved from The Western
Regional Climate Center Website: http://www.wrcc.dri.edu/cgi-bin/cliMAIN.pl?sc0170
34
115
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
SECTION 4
HAZARD IDENTIFICATION
This section describes how the Planning Team identified the hazards to be included in the Plan. It
consists of the following five subsections:
❖ 4.1 Overview
❖ 4.2 Description of Full Range of Hazards
❖ 4.3 Disaster Declarations
❖ 4.4 Hazard Evaluation
❖ 4.5 Hazard Identification Results
IFR §201.6(c)(2): The plan shall include a risk assessment that provides the factual basis for activities
proposed in the strategy to reduce losses from identified hazards. Local risk assessments must provide sufficient
information to enable the jurisdiction to identify and prioritize appropriate mitigation actions to reduce losses
from identified hazards.
IFR §201.6(c)(2)(ii): [The risk assessment shall include a] description of the jurisdiction’s vulnerability
to the hazards described in paragraph (c)(2)(i) of this section. This description shall include an overall
summary of each hazard and its impact on the community.
OVERVIEW
Anderson and Oconee Counties are vulnerable to a wide range of natural and human -caused hazards
that threaten life and p roperty. Current FEMA regulations and guidance under the Disaster Mitigation
Act of 2000 (DMA 2000) require, at a minimum, an evaluation of a full range of natural hazards. An
evaluation of man-made hazards (i.e., technological hazards, terrorism, etc.) is encouraged, though not
required, for plan approval. Note that eliminating man -made hazards does not suggest that those type
hazards are not of concern to the Counties, only that they are not natural hazards, and therefore the
HMPC determined that they wou ld not be included in the Plan update. Anderson and Oconee County
has included an assessment of primarily natural hazards, but some man -made hazards have also been
identified. Some parts of the original Plan were preserved. Where applicable, portions of t he historical
hazard data have been retained. As part of the update process, the HMPC reviewed the hazards section
of the previous plans, and incorporated changes related to recent hazard events that have affected the
Counties.
35
116
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Upon a review of the full range of natural hazards suggested under FEMA planning guidance, Anderson
and Oconee County and their fourteen participating municipalities have identified several hazards that
are to be addressed in their Multi -Jurisdictional Hazard Mitigation Plan. These hazards were identified
through an extensive process that utilized input from the Anderson Oconee County Hazard Mitigation
Planning Team members, research of past disaster declarations in the county, 1 and review of the South
Carolina State Hazard Mit igation Plan. Readily available information from reputable sources (such as
federal and state agencies) was also evaluated to supplement information from these key sources.
Additionally, Hazards which were analyzed and not included in the plan; yet Anderson and Oconee counties
often experience aftereffects such as high winds, increased rainfall and possible increase flooding, which are
addressed in the plan; yet these hazards are not a di rect threat to Anderson and Oconee county yet were
analyzed and not included in the plan and they are: T ropical cyclone, tropical depression, tropical storm and
major hurricane:
A Tropical cyclone is a rotating, organized system of clouds and thunderstorm s that originates over tropical or
subtropical waters and has a closed low -level circulation. Tropical cyclones rotate counterclockwise in the
Northern Hemisphere. They are classified as follows:
• Tropical Depression: A tropical cyclone with maximum sustained winds of 38 mph (33 knots) or less.
• Tropical Storm: A tropical cyclone with maximum sustained winds of 39 to 73 mph (34 to 63 knots).
• Hurricane: A tropical cyclone with maximum sustained winds of 74 mph (64 knots) or higher. In the
western North Pacific , hurricanes are called typhoons; similar storms in the Indian Ocean and South
Pacific Ocean are called cyclones.
• Major Hurricane: A tropical cyclone with maximum sustained winds of 111 mph (96 knots) or higher,
corresponding to a Category 3, 4 or 5 on the Saffir-Simpson Hurricane Wind Scale.
Tropical cyclones forming between 5- and 30 -degrees North latitude typically move toward the west.
Sometimes the winds in the middle and upper levels of the atmosphere change and steer the cyclone toward
the north and northwest. When tropical cyclones reach latitudes near 30 degrees North, they often move
northeast.
After a thorough review and analysis, it was determined that Anderson and Oconee counties were not subject
to any unique natural hazards. Anderson and Oconee County are located in the northwest corner of South
Carolina. The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean
is approximately 200 miles to the east. Therefore, Tropical cyclone, t ropical depression, tropical storm and
major hurricane do not pose a direct threat to Anderson and Oconee county.
Anderson and Oconee counties also addressed climate change and its effects on both counties (see Annex C).
Climate change is generally defined as a significant variation of average weather conditions; conditions
becoming warmer, wetter, or drier over several decades or more. It’s the longer-term trend that differentiates
climate change from natural weather variability. Changes in the probability of future hazard events may include
changes in location, increases or decreases to the impacts, and/or extent of known natural hazards, such as
floods or droughts. Changes in temperature, intensity, hazard distribution, and/or frequency of weather events
may increase vulnerability to these hazards in the future. FEMA’s Climate Change Adaptation Policy (2011 -
OPPA-01) directs FEMA programs and policies to integrate considerations of climate change adaptation. The
challenges posed by climate change, such as more intense storms, frequent heavy precipitation, heat waves,
drought, extreme flooding, and higher sea levels, could significantly alter the types and magnitudes of hazards
impacting states in the future. Due to the inherent uncertainties with projections of future hazard events, states
36
117
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
are expected to look across the whole community of partners (for example, publ ic, private, academic, non -
governmental, etc.) to identify the most relevant data and select the most appropriate methodologies to assess
risks and vulnerability.
Anderson and Oconee County are located in the northwest corner of South Carolina. The Appalachian and Blue
Ridge Mountains border the region to the northwest and the Atlantic Ocean is approximately 200 miles to the
east. In comparison to the rest of South Carolina the climate of the upstate area is relatively mild; yet Anderson
and Oconee are not immune from the effects of climate change. ,
Table 4.1 lists the full range of hazards initially identified for inclusion in the Plan and provides a brief
description for each. This table includes 24 individual hazards. Some of these hazards are considered to
be interrelated or cascading, but for preliminary hazard identification purposes, these individual hazards
are broken out separately.
Next, Table 4.2 lists the disaster declarations in Anderson and Oconee County.
Next, Table 4.3 documents the evaluation process used for determining which of the initially identified
hazards are considered significant enough to warrant further evaluation in the risk assessment. For each
hazard considered, the table indicates whether or not the hazard was ident ified as a significant hazard
to be further assessed, how this determination was made, and why this determination was made. The
table works to summarize not only those hazards that were identified (and why) but also those that were
not identified (and why not). Hazard events not included at this time may be addressed during future
evaluations and updates of the risk assessment if deemed necessary by the Hazard Mitigation Planning
Team during the plan update process.
Lastly, Table 4.4 provides a summary of the hazard identification and evaluation process noting that - 9-
of the 24 initially identified hazards are considered significant enough for further evaluation through this
Plan’s risk assessment (marked with a “
”).
37
118
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
DESCRIPTION OF FULL RANGE OF HAZARDS
TABLE 4.1: DESCRIPTIONS OF THE FULL RANGE OF INITIALLY IDENTIFIED
HAZARDS
Hazard Description
ATMOSPHERIC HAZARDS
Avalanche A rapid fall or slide of a large mass of snow down a mountainside.
Drought / Heat
Wave
A prolonged period of less than normal precipitation such that the lack
of water causes a serious hydrologic imbalance. Common effects of
drought include crop failure, water supply shortages, and fish and
wildlife mortality. High temperatures, high winds, and low humidity
can worsen drought conditions and also make areas more susceptible
to wildfire. Human demands and actions have the ability to hasten or
mitigate drought-related impacts on local communities.
Extreme Cold Extreme cold is generally considered to occur when the temperature is
at or below freezing for a period of time. Often these events are
associated with winter storms and other winter weather, but extreme
cold events can occur on their own. Dangers associated with extreme
cold events include frostbite and hypothermia among other impacts to
people and these events can often last for several days or weeks in a
row.
Hailstorm /
Thunderstorms
Any storm that produces hailstones that fall to the ground; usually used
when the amount or siz e of the hail is considered significant. Hail is
formed when updrafts in thunderstorms carry raindrops into parts of
the atmosphere where the temperatures are below freezing.
Heat
Wave/Extreme
Heat
A heat wave may occur when temperatures hover 10 degrees or more
above the average high temperature for the region and last for several
weeks. Humid or muggy conditions, which add to the discomfort of
high temperatures, occur when a “dome” of high atmospheric pressure
traps hazy, damp air near the ground. Excess ively dry and hot
conditions can provoke dust storms and low visibility. A heat wave
combined with a drought can be very dangerous and have severe
economic consequences on a community.
38
119
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Hurricane/Tropical
Storm
Hurricanes and tropical storms are classified as cyclones and defined
as any closed circulation developing around a low -pressure center in
which the winds rotate counter-clockwise in the Northern Hemisphere
(or clockwise in the Southern Hemisphere) and with a diameter
averaging 10 to 30 mil es across. When maximum sustained winds
reach or exceed 39 miles per hour, the system is designated a tropical
storm, given a name, and is closely monitored by the National
Hurricane Center. When sustained winds reach or exceed 74 miles per
hour the storm is deemed a hurricane. The primary damaging forces
associated with these storms are high -level sustained winds, heavy
precipitation, and tornadoes. Coastal areas are also vulnerable to the
additional forces of storm surge, wind -driven waves, and tidal
flooding which can be more destructive than cyclone wind. The
majority of hurricanes and tropical storms form in the Atlantic Ocean,
Caribbean Sea, and Gulf of Mexico during the official Atlantic
hurricane season, which extends from June through November.
Lightning Severe
Storms /
Thunderstorms
Lightning is a discharge of electrical energy resulting from the buildup
of positive and negative charges within a thunderstorm, creating a
“bolt” when the buildup of charges becomes strong enough. This flash
of light usually occurs within the clouds or between the clouds and the
ground. A bolt of lightning can reach temperatures approaching
50,000 degrees Fahrenheit. Lightning rapidly heats the sky as it
flashes, but the surrounding air cools following the bolt. This ra pid
heating and cooling of the surrounding air causes thunder. On average,
73 people are killed each year by lightning strikes in the United States.
Nor’easter Similar to hurricanes, nor’easters are ocean storms capable of causing
substantial damage to coastal areas in the Eastern United States due to
their associated strong winds and heavy surf. Nor'easters are named
for the winds that blow in from the northeast and drive the storm up
the East Coast along the Gulf Stream, a band of warm water that lies
off the Atlantic coast. They are caused by the interaction of the jet
stream with horizontal temperature gradients and generally occur
during the fall and winter months when moisture and cold air are
plentiful. Nor’easters are known for dumping heavy amoun ts of rain
and snow, producing hurricane-force winds, and creating high surf that
causes severe beach erosion and coastal flooding.
Severe
Thunderstorm/
High Wind
Thunderstorms are caused by air masses of varying temperatures
meeting in the atmosphere. Rapidly rising warm moist air fuels, the
formation of thunderstorms. Thunderstorms may occur singularly, in
lines, or in clusters. They can move through an area very quickly or
linger for several hours. Thunderstorms may result in hail, tornadoes,
or straight-line winds. Windstorms pose a threat to lives, property, and
vital utilities primarily due to the effects of flying debris that can down
trees and power lines.
39
120
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Tornado / High
Winds
A tornado is a violently rotating column of air that has contact with
the ground and is often visible as a funnel cloud. Its vortex rotates
cyclonically with wind speeds ranging from as low as 40 mph to as
high as 300 mph. Tornadoes are most often generated by thunderstorm
activity when cool, dry air intersects and overrides a layer of warm,
moist air forcing the warm air to rise rapidly. The destruction caused
by tornadoes ranges from light to catastrophic depending on the
intensity, size, and duration of the storm.
Winter Storm Winter storms may include snow, sleet, freezing rain, or a mix of these
wintry forms of precipitation. Blizzards, the most dangerous of all
winter storms, combine low temperatures, heavy snowfall, and winds
of at least 35 miles per hour, reducing visibility to only a few yards.
Ice storms occur when moisture falls and freezes immediately upon
impact on trees, power lines, communication towers, structures, roads,
and other hard surfaces. Winter storms and ice storms can down trees,
cause widespread power outages, damage property, and cause
fatalities and injuries to human life.
GEOLOGIC HAZARDS
Expansive Soils Soils that will exhibit some degree of volume change with variations
in moisture conditions. The most important properties affecting degree
of volume change in a soil are clay mineralogy and the aqueous
environment. Expansive soils will exhibit expansion caused by the
intake of water and, conversely, will exhibit contraction when
moisture is removed by drying. Generally speaking, they often appear
sticky when wet and are characterized by s urface cracks when dry.
Expansive soils become a problem when structures are built upon
them without taking proper design precautions into account with
regard to soil type. Cracking in walls and floors can be minor or can
be severe enough for the home to be structurally unsafe.
Earthquake A sudden, rapid shaking of the Earth caused by the breaking and
shifting of rock beneath the surface. This movement forces the gradual
building and accumulation of energy. Eventually, strain becomes so
great that the energy is abruptly released, causing the shaking at the
earth’s surface which we know as an earthquake. Roughly 90 percent
of all earthquakes occur at the boundaries where tectonic plates meet,
although it is possible for earthquakes to occur entirely with in plates.
Earthquakes can affect hundreds of thousands of square miles, cause
damage to property measured in the tens of billions of dollars, result
in loss of life and injury to hundreds of thousands of persons and
disrupt the social and economic functioning of the affected area.
Landslide The movements of a mass of rock, debris, or earth down a slope when
the force of gravity pulling down the slope exceeds the strength of the
earth materials that comprise to hold it in place. Slopes greater than 10
degrees are more likely to slide, as are slopes where the height from
the top of the slope to its toe is greater than 40 feet. Slopes are also
more likely to fail if vegetative cover is low and/or soil water content
40
121
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
is high.
Land
Subsidence/Sinkhole
The gradual settling or sudden sinking of the Earth’s surface due to the
subsurface movement of earth materials. Causes of land subsidence
include groundwater pump age, aquifer system compaction, drainage
of organic soils, underground mining, hydro compaction, natural
compaction, sinkholes, and thawing permafrost.
Tsunami A series of waves generated by an undersea disturbance such as an
earthquake. The speed of a tsunami traveling away from its source can
range from up to 500 miles per hour in deep water to approximately
20 to 30 miles per hour in shallower areas near coastlines. Tsunamis
differ from regular ocean waves in that their currents travel from the
water surface all the way down to the sea floor. Wave amplitudes in
deep water are typically less than one meter; they are often barely
detectable to the human eye. However, as they approach shore, they
slow in shallower water, essentially causing the waves from behind to
effectively “pile up,” and wave heights increase dramatically. As
opposed to typical waves which crash at the shoreline, tsunamis bring
with them a continuously flowing ‘wall of water’ with the potential to
cause devastating damage in coastal areas located immediately along
the shore.
Volcano A mountain that opens downward to a reservoir of molten rock below
the surface of the earth. While most mountains are created by forces
pushing up the earth from below, volcanoes are different in that they
are built up over time by an accumulation of their own eruptive
products: lava, ash flows, and airborne ash and dust. Volcanoes erupt
when pressure from gases and the molten rock beneath becomes strong
enough to cause an explosion.
HYDROLOGIC HAZARDS
Erosion Erosion is the gradual breakdown and movement of land due to both
physical and chemical processes of water, wind, and general
meteorological conditions. Natural, or geologic, erosion has occurred
since the Earth’s formation and continues at a very slow and uniform
rate each year.
Dam and Levee
Failure
Dam failure is the collapse, breach, or other failure of a dam structure
resulting in downstream flooding. In the event of a dam failure, the energy
of the water stored behind even a small dam is capable of causing loss of life
and severe property damage if development exists downstream of the d am.
Dam failure can result from natural events, human -induced events, or a
combination of the two. The most common cause of dam failure is prolonged
rainfall that produces flooding. Failures due to other natural events such as
hurricanes, earthquakes, or l andslides are significant because there is
generally little or no advance warning.
41
122
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Floods The accumulation of water within a water body which results in the
overflow of excess water onto adjacent lands, usually floodplains. The
floodplain is the land adjoining the channel of a river, stream, ocean,
lake, or other watercourse or water body that is susceptible to flooding.
Most floods fall into the following three categories: riverine flooding,
coastal flooding, or shallow flooding (where shallow floodin g refers
to sheet flow, ponding, and urban drainage).
Storm Surge A storm surge is a large dome of water often 50 to 100 miles wide and
rising anywhere from four to five feet in a Category 1 hurricane up to
more than 30 feet in a Category 5 storm. Storm surge heights and
associated waves are also dependent upon the shape of the offshore
continental shelf (narrow or wide) and the depth of the ocean bottom
(bathymetry). A narrow shelf, or one that drops steeply from the
shoreline and subsequently produces deep water close to the shoreline,
tends to produce a lower surge but higher and more powerful storm
waves. Storm surge arrives ahead of a storm’s actual landfall and the
more intense the hurricane is, the sooner the surge arrives. Storm surge
can be devastating to coastal regions, causing severe beach erosion and
property damage along the immediate coast. Further, water rise caused
by storm surge can be very rapid, posing a serious threat to those who
have not yet evacuated flood-prone areas.
OTHER HAZARDS
Wildfire An uncontrolled wildfire burning in an area of vegetative fuels such as
grasslands, brush, or woodlands. Heavier fuels with high continuity,
steep slopes, high temperatures, low humidity, low rainfall, and high
winds all work to increase risk for people and property located within
wildfire hazard areas or along the urban/wildland interface. Wildfires
are part of the natural management of forest ecosystems, but most are
caused by human factors. Over 80 percent of forest fires are started by
negligent human behavior such as smoking in wooded areas or
improperly extinguishing campfires. The second most common cause
for wildfire is lightning.
Hazardous
Materials
Incident
Hazardous material (HAZMAT) incidents can apply to fixed facilities
as well as mobile, transportation-related accidents in the air, by rail,
on the nation’s highways and on the water. HAZMAT incidents
consist of solid, liquid and/or gaseous contaminants that are released
from fixed or mobile containers, whether by accident or by des ign as
with an intentional terrorist attack. A HAZMAT incident can last
hours to days, while some chemicals can be corrosive or otherwise
damaging over longer periods of time. In addition to the primary
release, explosions and/or fires can result from a re lease, and
contaminants can be extended beyond the initial area by persons,
vehicles, water, wind and possibly wildlife as well.
Transportation
Incident
Transportation incidents come in many forms in the United States,
especially given the many forms of transportation available today. The
most common types of transportation incidents are motor vehicle
42
123
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
accidents, but plane, train, and watercraft accidents occur as well and
often have higher magnitude impacts.
DISASTER DECLARATIONS
Disaster declarations provide initial insight into the hazards that may impact Anderson and Oconee
County planning area. Since 1990, eight presidential disaster declarations have been reported in Anderson
and Oconee County. This includes three events related to severe storms and flooding, one severe winter
weather events, one hurricane, one tropical storm, one wild fire and one pandemic. However, this list is
not inclusive of many of the major disaster events that impacted the counties and which may have resulted
in Small Business Administration disaster loan assistance or no federal assistance.
TABLE 4.2: ANDERSON / OCONEE COUNTY DISASTER DECLARATIONS
YEAR DATE DISASTER
2004 10/7 Tropical Storm Frances DR-1509
2004 2/13 Ice storm DR-1566
2015 10/5 Severe Storms and Flooding DR-4241
2016 11/12 South Carolina Pinnacle Mountain Fire (Pickens County)
FM-5162
2017 10/16 Hurricane Irma DR-4346
2020 3/17 Severe storms, Tornadoes, Straight-line Winds, and Flooding DR-4479
2020 3/27 Covid-19 DR-4492
2020 5/1 Severe storms, Tornadoes, Straight-line Winds, and Flooding DR-4542
Source: www.fema.gov
HAZARD EVALUATION
43
124
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
TABLE 4.3: DOCUMENTATION OF THE HAZARD EVALUATION PROCESS
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
ATMOSPHERIC HAZARDS
Avalanche
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan
Review of US Forest
Service National
Avalanche Center
website
(https://avalanche.org)
The United States avalanche hazard is
limited to mountainous western states
including Alaska as well as some
areas of low risk in New England.
Avalanche was not included in the
SC State Hazard Mitigation Plan.
Avalanche was not identified as a
hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
There is no risk of avalanche events
in South Carolina.
44
125
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Drought / Heat
Wave
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan
Review of US Drought
Monitor website
Drought is a normal part of virtually all
climatic regimes, including areas with
high and low average rainfall.
The SC State Hazard Mitigation Plan
found the entire state to be vulnerable
to drought, and all buildings and
facilities are considered to be equally
exposed to this hazard.
Drought was included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
There are reports of moderate to
exceptional drought conditions in
Anderson/Oconee County according to
the US Drought Monitor.
Extreme Cold
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan
Review of NOAA NCEI
Storm Events Database
Because South Carolina is located in
the southeastern United States, it
rarely experiences extreme cold
events that are on par with other
locations in the country.
Extreme cold was not included in the
SC State Hazard Mitigation Plan.
Extreme cold was not identified as a
hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
45
126
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Hailstorm /
Thunderstorm
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan
Review of NOAA NCEI
Storm Events Database
Although hailstorms occur primarily in
the Midwestern states, they do occur in
every state on the mainland
U.S. Most inland regions experience
hailstorms at least two or more days
each year.
Hail is discussed in the SC State
Hazard Mitigation Plan, and due to its
unpredictability, all buildings and
facilities are considered to be equally
exposed to this hazard. According to
the state plan, the historical annualized
losses from hail from 1960-2020 are
$216, 221 for Anderson and
$1,828,285 for Oconee County.
Hail was included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
Heat
Wave/Extreme
Heat
No
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database.
Many areas of the United States are
susceptible to heat waves, including
South Carolina.
The SC State Hazard Mitigation Plan
identifies extreme heat as a hazard with
the potential to affect the state.
Extreme heat / Heat Wave was
included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
1 A complete list of disaster declarations for Anderson and Oconee County can be found above in Table 4.2.
46
127
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Hurricane/Trop.
Storm
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Analysis of NOAA
historical tropical
cyclone tracks and
National Hurricane
Center Website.
Review of NOAA NCEI
Storm Events Database
Review of historical
presidential disaster
declarations.
The Atlantic and Gulf regions are
most prone to landfall by hurricanes
and tropical storms.
The SC State Hazard Mitigation Plan
found the entire state to be vulnerable
to hurricanes. According to the state
plan the historical annualized losses
from hurricanes in Anderson/Oconee
County.
Annualized loss estimations (building
damage, contents damage, and
inventory loss) due to hurricane wind
hazards in Anderson/Oconee County.
NOAA historical records indicate 42
hurricanes/tropical storms have come
within 75 miles of Anderson/Oconee
County since 1859.
NCEI reports one tropical storm event
for Anderson/Oconee County,
Four of the eight disaster
declarations in Anderson/Oconee
County were directly related to a
tropical storm or hurricane event.
The 50-year return period peak gust
for hurricane and tropical storm events
in Anderson/Oconee County is 60
mph.
47
128
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Lightning Severe
Storms /
Thunderstorms
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database
Review of Vaisala’s
NLDN Lightning Flash
Density Map.
The central region of Florida has the
highest density of lightning strikes in
the US; however, lightning events are
experienced in nearly every region.
Lightning is discussed in the SC State
Hazard Mitigation Plan, and due to its
unpredictability, all buildings and
facilities are considered to be equally
exposed to this hazard. According to
the state plan the historical annualized
losses from 1960-2020 from lightning
are Anderson $170,368 and Oconee
$30,413.
Lightning was included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
According to Vaisala’s U.S. National
Lightning Detection Network,
Anderson/Oconee County is located in
an area that experienced an average of
4 to 8 lightning flashes per square
kilometer per year between 2010 and
2019.
48
129
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Nor’easter
NO
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database.
Nor’easters are discussed in the SC
State Hazard Mitigation Plan as part
of the winter storm hazard.
Nor’easter was not identified as a
hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
NCEI does not report any nor’easter
activity for Anderson/Oconee County.
However, nor’easters may have
affected the area as severe winter
storms. In this case, the activity would
be reported under winter storm events.
Severe
Thunderstorm/High
Wind
No
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan;
High winds are included
with Tornadoes and
Thunderstorms are
included with Hail
Storms.
Review of NOAA NCEI
Storm Events Database
Review of historical
presidential disaster
declarations.
Over 100,000 thunderstorms are
estimated to occur each year on the
U.S. mainland, and they are experienced
in nearly every region.
Severe thunderstorms are discussed in
the SC State Hazard Mitigation Plan,
and due to its unpredictability, all
buildings and facilities are considered
to be equally exposed to this hazard.
According to the state plan the
historical annualized losses from
severe thunderstorm are $107,203 for
Anderson and $105,775 for Oconee
County.
Severe thunderstorm/High Wind
was not included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
High winds are included in
Tornadoes and Thunderstorm s are
included with Hail Storms.
49
130
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Tornado / High
Winds
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database
Review of historical
presidential disaster
declarations.
The U.S. reports over 800 tornadoes
nationwide, resulting in an average of
80 deaths and 1,500 injuries.
Tornadoes are discussed in the SC
State Hazard Mitigation Plan, and
because the location of tornado strikes
are not limited to specific geographic
regions of the state, all buildings and
facilities are considered to be equally
exposed to this hazard. According to
the state plan the historical annualized
losses from tornadoes are $216,221 for
Anderson and $1,828,285 for Oconee
County.
Tornados were also included in the
previous Anderson/Oconee County
Hazard Mitigation Plan.
50
131
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Winter Storm
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database
Review of historical
presidential disaster
declarations.
Winter storms affect every state in
the continental U.S. and Alaska.
Severe winter storms, including
blizzard, ice storm, and nor’easter, are
discussed in the SC State Hazard
Mitigation Plan, and while South
Carolina does not regularly encounter
winter storms, they can occur
anywhere in the state and all buildings
and facilities are considered to be
equally exposed to this hazard.
According to the state plan the
historical annualized losses from
winter storms are $1,215,466 for
Anderson and $1,632,655 for Oconee
County. Historically,
Anderson/Oconee County have the
highest number of loss-causing winter
storm events in the state.
Winter storms were included in the
previous Anderson/Oconee County
Hazard Mitigation Plan.
NCEI reports that Anderson/Oconee
County has been affected by 69
winter weather events since 1996
51
132
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Earthquake
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of National
Geophysical Data
Center website.
Review of USGS
Earthquake Hazards
Program website.
Although the zone of greatest seismic
activity in the United States is along
the Pacific Coast, eastern regions have
experienced significant earthquakes.
Earthquakes are discussed in the SC
State Hazard Mitigation Plan, and the
Piedmont/Blue Ridge region (which
includes Anderson/Oconee County) is
generally considered at a low risk of
major (magnitude 6+ on the Richter
Scale) earthquakes but is susceptible to
smaller earthquakes (magnitude 2-4).
Earthquake was included in the
previous Anderson/Oconee County
Hazard Mitigation Plan.
Earthquakes have occurred in and
around the State of South Carolina in
the past. The state is affected by the
Charleston Fault line which has
generated one magnitude 8.0
earthquake in the last 200 years.
Since 2010, 12 earthquakes have been
reported within 150 km of
Anderson/Oconee County, all below a
3.0 magnitude.
According to USGS seismic hazard
maps, the peak ground acceleration
(PGA) with a 10% probability of
exceedance in 50 years for
Anderson/Oconee County is
approximately 5 to 7%g. FEMA
recommends that earthquakes be
further evaluated for mitigation
purposes in areas with a PGA of 3%g
or more.
52
133
SECTION 3: COMMUNITY PROFILE
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Expansive Soils
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of USGS
Swelling Clays Map of
the Conterminous US.
The effects of expansive soils are
most prevalent in parts of the
Southern, Central, and Western U.S.
Expansive soils were not included in
the SC State Hazard Mitigation Plan.
Expansive soils were not identified
as a hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
Anderson and Oconee County is
located in an area that has little to no
clay swelling potential.
53
134
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Land
Subsidence/Sinkhole
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Land subsidence affects at least 45
states, including South Carolina.
However, because of the broad range
of causes and impacts, there has been
limited national focus on this hazard.
The SC State Hazard Mitigation Plan
did not analyze sinkholes because
while South Carolina does experience
sinkholes, no loss data has been
collected at this time.
Land subsidence was not identified as
a hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
Tsunami
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of FEMA “How-
to” mitigation planning
guidance (Publication
386-2, “Understanding
Your Risks – Identifying
Hazards and Estimating
Losses)
No record exists of a catastrophic
Atlantic basin tsunami impacting the
mid-Atlantic coast of the United States.
Tsunami inundation zone maps are
not available for communities located
along the U.S. East Coast.
Tsunamis are described in the SC
State Hazard Mitigation Plan as an
extremely low threat for South
Carolina, and any tsunamis impacting
the state would likely be small and
mostly inundate the beaches
exclusively.
Tsunami was not identified as a
hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
FEMA mitigation planning guidance
suggests that locations along the U.S.
East Coast have a relatively low
tsunami risk and do not need to
conduct a tsunami risk assessment at
this time.
54
135
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Volcano
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of USGS
Volcano Hazards
Program website.
More than 65 potentially active
volcanoes exist in the United States,
and most are located in Alaska. The
Western states and Hawaii are also
potentially affected by volcanic
hazards.
Volcano was not included in the SC
State Hazard Mitigation Plan.
Volcano was not identified as a
hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
There has not been a volcanic eruption
in South Carolina in over 750 million
years. However, the red clay soil
found in the area is a result of iron that
flowing lava brought to the area.
No volcanoes are located in or near
Anderson/Oconee County.
HYDROLOGIC HAZARDS
Dam and Levee
Failure
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
The National Inventory of Dams
shows dams are located in every
state.
Dam/levee failure is discussed in the
SC State Hazard Mitigation Plan as
part of the flood hazard.
Dam and levee failure was not
identified as a hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
55
136
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Erosion
NO
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Erosion is discussed in the SC State
Hazard Mitigation Plan under costal
hazards. Only coastal erosion is
identified as a hazard of concern for
South Carolina (not riverine or soil
erosion).
Erosion was not identified as a
hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
56
137
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or
No)
How was this
determination
made?
Why was this determination
made?
Flood
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of National
Oceanic and
Atmospheric
Administration (NOAA).
National Centers for
Environmental
Information (NCEI)
Storm Events Database.
Review of historical
disaster declarations.
Review of FEMA Flood
Insurance Rate Maps
(DFIRM) data.
Review of FEMA’s
National Flood Insurance
Program(NFIP)Communi
ty Status Book and
Community Rating
System (CRS).
Floods occur in all 50 states and in
the U.S. territories. Flooding is the
most frequent and costly hazard in
the US; 75% of all presidential
disasters have been related to
flooding.
Flood is thoroughly discussed in the
SC State Hazard Mitigation Plan. The
State is found to be at risk of riverine
flooding, coastal flooding, flash
flooding, local drainage problems, and
dam/levee failure. According to the
state plan the historical annualized
losses from flood are $80,982 for
Anderson and $115,907 for Oconee
County.
Flood was included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
Seven jurisdictions in Anderson
county and three in Oconee participate
in the NFIP; however, no jurisdictions
currently participate in the CRS.
57
138
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Storm Surge
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database.
Given the inland location of
Anderson/Oconee County, storm
surge would not likely affect the
area.
Storm surge is discussed in the SC
State Hazard Mitigation Plan under
the hurricane hazard, and the state
plan indicates that only the coastal
shoreline counties are subject to
storm surge.
Storm surge was not identified as a
hazard in the previous Anderson
Oconee County Hazard Mitigation
Plan.
NCEI does not report any historical
storm surge events for
Anderson/Oconee County.
58
139
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Coastal Flooding &
High Winds
NO
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of NOAA NCEI
Storm Events Database.
Given the inland location of
Anderson/Oconee County, coastal
flooding would not likely affect the
area. Any high winds would be
associated with hurricanes traveling
inland.
Coastal flooding & winds are
discussed in the SC State Hazard
Mitigation Plan under the hurricane
hazard, and the state plan indicates
that only the coastal shoreline
counties are subject to coastal
flooding & winds.
Coastal flooding & high winds were
not identified as a hazard in t he
previous Anderson Oconee County
Hazard Mitigation Plan.
NCEI does not report any historical
coastal flooding events for
Anderson/Oconee County.
59
140
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
OTHER HAZARDS
Wildfire
YES
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of Southern
Wildfire Risk
Assessment (SWRA).
Data
Review of the SC
Forestry Commission
website and data.
Wildfires occur in virtually all parts of
the United States. Wildfire hazard risks
will increase as low-density
development along the urban/wildland
interface increases.
Wildfire is discussed in the SC State
Hazard Mitigation Plan, and since the
majority of wildfires are human-
caused or from lightning strikes, they
can occur anywhere in South Carolina
and all buildings and facilities are
considered to be equally exposed to
this hazard. According to the state
plan, the historical annualized losses
from wildfire for Anderson County is
$0. However, Anderson experienced
one fire in 1985 causing over 239,430
crop damage and 3,900 property
damage less than 100 acres damage:
Oconee County did experience one
major fire in 1985 causing over
$26,478.88 in property damage and
$264,788.71 in crop damage, and over
100 acres property damage.; however
neighboring Pickens county
experienced the Pinnacle Mountain
fire in 2016, which resulted in more
than $5 million in expenses and
10,623 acres burned.
Wildfire was included in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
A review of SWRA data indicates
that there are some areas of
elevated concern in
Anderson/Oconee County.
60
141
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Hazardous
Materials Incident
No
Review of FEMA’s
Multi-Hazard
Identification and Risk
Assessment.
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Review of EPA Toxic
Release Inventory (TRI).
Review of USDOT
Pipeline and Hazardous
Materials Safety.
Administration (PHMSA)
incident database.
Discussions with local
LEPC/HazMat
officials.
Cities, counties, and towns where
hazardous materials fabrication,
processing, and storage sites are
located, and those where hazardous
waste treatment, storage or disposal
facilities operate, are at risk for
hazardous materials events.
Although hazardous materials incidents
are discussed in the SC State Hazard
Mitigation Plan, annualized losses
from hazardous materials incidents are
not reported.
The SC State Hazard Mitigation Plan
indicates the following hazardous
materials sites are located within
Anderson County: 56 TRI sites, 1
Hazardous Material
Treatment/Storage/Disposal sites, and
25 Solid Waste Landfills. Oconee
County: 24 TRI sites, and 8 Solid
Waste Landfills.
61
142
Natural
Hazards
Considered
Was this
hazard
identified as
a significant
hazard to
be
addressed
in the plan
at this
time?
(Yes or No)
How was this
determination
made?
Why was this determination
made?
Transportation
Incident
No
Review of SC State
Hazard Mitigation Plan.
Review of previous
Anderson/Oconee
County Hazard
Mitigation Plan.
Discussions with local
officials.
Transportation incident was not
included in the SC State Hazard
Mitigation Plan.
Transportation incident was not
identified as a hazard in the previous
Anderson/Oconee County Hazard
Mitigation Plan.
62
143
4.1 HAZARD IDENTIFICATION RESULTS
TABLE 4.4: SUMMARY RESULTS OF THE HAZARD IDENTIFICATION AND EVALUATION PROCESS
ATMOSPHERIC HAZARDS GEOLOGIC HAZARDS
Avalanche Earthquake
Drought Expansive Soils
Extreme Cold Landslide
Hailstorm Land Subsidence/Sinkhole
Heat Wave/Extreme Heat Tsunami
Hurricane/Tropical Storm Volcano
Lightning HYDROLOGIC HAZARDS
Nor’easter Dam and Levee Failure
Severe Thunderstorm/High Wind Erosion
Tornado Flood
Winter Storm and Freeze Storm Surge
OTHER HAZARDS
Wildfire
Hazardous Materials Incident
Transportation Incident
= Hazard considered significant enough for further evaluation in the Anderson & Oconee County hazard risk
assessment.
63
144
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
SECTION
5
HAZARD PROFILES
This section includes detailed hazard profiles for each of the hazards identified in Section 4 ( Hazard
Identification) as significant enough for further evaluation in the Multi -Jurisdictional Hazard Mitigation
Plan. It contains the following subsections:
Overview
❖ 5.1 Overview
❖ 5.2 Study Area
Atmospheric Hazards
❖ 5.3 W i n t e r S t o r m s
❖ 5.4 Hail/Thunderstorms
❖ 5.5 L i g h t i n g / T h u n d e r s t o r m s
❖ 5.6 T o r n a d o / H i g h W i n d s
❖ 5.7 Drought/Heatwave
❖ 5.8 F l o o d s
❖ 5.9 W i l d f i r e s
❖ 5.10 H u r r i c a n e
❖ 5.11 Earthquake
Conclusions
❖ 5.17 Conclusions on Hazard Risk
❖ 5.18 Final Determinations
Overview
5.1 OVERVIEW
This section includes detailed hazard profiles for each of the hazards identified in Section 4 ( Hazard
Identification) as significant enough for furthe r evaluation in the Multi -Jurisdictional Hazard Risk
Assessment by creating a hazard profile. Each hazard profile includes a general description of the hazard,
its location and extent, notable historical occurrences, and the probability of future occurrences.
44 CFR Requirement
44 CFR Part 201.6(c)(2)(i): The risk assessment shall include a description of the type, location and extent of all
natural hazards that can affect the jurisdiction. The plan shall include information on previous occurrences of
hazard events and on the probability of future hazard events
64
145
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Each profile also includes specific items noted by members of the Hazard Mitigation Planning Team as it
relates to unique historical or anecdotal hazard information for Anderson County & Oconee County or a
participating municipality within it.
The following hazards were identified:
❖ Atmospheric
❖ Drought/Heatwave
❖ Hail/Thunderstorm
❖ Hurricane/Tropical Storm
❖ Lightning
❖ Severe Thunderstorm/High Wind
❖ Tornado
❖ Winter Storm and Freeze
❖ Wildfire
The DMA 2000 legislation and related FEMA planning guidance require mitigation plans to include discussion of
community vulnerability to natural hazards. Vulnerability is generally defined as the damage (including direct
damages and loss of function) that would occur when various levels of hazards impact a structur e, operation or
population. For example, vulnerability can be expressed as the percent damage to a building when it is flooded, or
the number of days that a government office will be shut down after a windstorm, etc., assuming there is sufficient
detailed data available to support the calculations. Because this Plan update is at the scale of multiple entire
Counties, it is not practical to complete vulnerability assessments on the many individual assets, operations and
populations in the planning area. It i s possible, however, to make some general observations based on the hazard
identifications and risk assessments that are the subjects of Section 5 of this Plan update. Therefore, the following
terms are used to describe levels of vulnerability.
• High – 66%-100% percent damage to a building when it is flooded, or the number of days that a government
office will be shut down.
• Moderate – 34%-65% percent damage to a building when it is flooded, or the number of days that a
government office will be shut down.
• Low – 0%-33% percent damage to a building when it is flooded, or the number of days that a government
office will be shut down.
As illustrated in Section 4 (Hazard Identification), each County is subject to numerous natural hazards, although in
some cases the hazards have rarely impacted the area, or their effects have been relatively minor. It is important to
recognize that several other hazards present significant risks (i.e., potential for future losses) to the County, even
though they have occurred infrequently in the past, or have not caused much damage.
65
146
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
The impact/extent of damage is derived primarily from utilizing calculations from the University of South
Carolina Hazards & Vulnerability Research Institute Department of Geography Spatial Hazard Event Loss Dataset
for the US (SHELDUS) information which o riginally contained only those events that generated greater than
$50,000 in combined crop and property damage. This damage assessment is countywide regardless of municipal
boundaries. Damage in less severe degrees may have occurred throughout the county a nd its municipalities
affecting each municipality in varying degrees depending on the severity of the hazard and time of year. The full
list of events, regardless of dollar amount, can be found on the University of South Carolina Hazards &
Vulnerability Research Institute’s SHELDUS website. In conjunction with the events noted on data from SHELDUS
the vulnerability of the Counties was calculated using the total number of events that met the threshold of
$50,000 in damage, number of years, and reoccurrence intervals; to provide a frequency hazard percentage for
each hazard.
During the 2023 HMP update FEMA National Risk Index (NRI) was utilized for each hazard. Risk index analysis
statistics were provided by FEMA and placed into corresponding sections. Each data set had varying time
periods, none going over the year 2017 for each risk. Risk Index scores are calculated by FEMA using an equation
that combines scores for Expected Annual Loss due to natural hazards, Social Vulnerability, and Community
Resilience:
Expected Annual Loss
×Social Vulnerability
÷Community Resilience
=Risk Index
Other data was compiled from various other sources such as maps from FEMA Resilience Analysis and Planning
Tool (RAPT) and climate data from National Centers for Environmental Information. Compiling data from various
sources allowed both counties to ensure that ample amounts of research, this would make mitigation strategies
simpler in critical moments.
66
147
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
5.2 STUDY AREA
Anderson and Oconee County includes 14 municipalities and the unincorporated area of the counties. Table
5.1 provides a summary table of the participating municipalities. In addition, Figure 5.1 provides a base map
of Anderson County for reference. Figure 5.2 provides a base map of Oconee County for reference.
TABLE 5.1: PARTICIPATING JURISDICTIONS IN THE
ANDERSON & OCONEE COUNTY HAZARD MITIGATION PLAN
Anderson County Oconee County
Anderson Salem
Belton Seneca
Honea Path Wahalla
Iva West Union
Pendleton Westminster
Pelzer
Starr
West Pelzer
Williamston
67
148
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
FIGURE 5.1: ANDERSON COUNTY BASE MAP
68
149
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
FIGURE 5.2: OCONEE COUNTY BASE MAP
69
150
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
FIGURE 5.3 SUMMARY OF IDENTIFIED HAZARD EVENTS IN ANDERSON & OCONEE COUNTY
https://www.arcgis.com/apps/mapviewer/index.html?layers=5c112c1f08e54108b410a67e8a93a07a
The maps presented in Figure 5.3 are an overview of both Anderson and Oconee counties and their
municipalities that are participating in the 2023 update of the haza rd mitigation plan. The data provided also
gives a brief overview of the particular hazards that will be discussed throughout this portion of the plan. In a
conjoining effort, both Anderson and Oconee counties have provided ample amounts of data to calculate risks,
event probability, and recommendations for mitigation.
70
151
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Atmospheric Hazards
5.3 Winter storms
5.3.1 Background
A winter storm can range from a moderate snow over a period of a few hours to blizzard conditions with
blinding wind-driven snow that lasts for several days. Events may include snow, sleet, freezing rain, or a
mix of these wintry forms of precipitation. Some winter storms might be large enough to affect several
states while others might affect only localized areas. Occasionally, heavy snow might also cause significant
property damages, such as roof collapses on older buildings. All winter storm events have the potential to
present dangerous conditions to the affected area.
Snowstorms
Larger snowfalls pose a greater risk, reducing visibility due to blowing snow and making driving conditions
treacherous. A heavy snow event is defined by the National Weather Service as an accumulation of 4 of
or more inches in 12 hours or less. A blizzard is the most severe form of wint er storm. It combines low
temperatures, heavy snow, and winds of 35 miles per hour or more, which reduces visibility to a quarter
mile or less for at least 3 hours. Winter storms are often accompanied by sleet, freezing rain, or an ice
storm. Such freeze events are particularly hazardous as they create treacherous surfaces.
Ice Storms
Ice storms are defined as storms with significant amounts of freezing rain and are a result of cold air
damming (CAD). CAD is a shallow, surface -based layer of relatively co ld, stably stratified air entrenched
against the eastern slopes of the Appalachian Mountains. With warmer air above, falling precipitation in
the form of snow melts, then becomes either super -cooled (liquid below the melting point of water) or
re-freezes. In the former case, super -cooled droplets can freeze on impact (freezing rain); while in the
latter case, the re -frozen water particles are ice pellets (or sleet). Sleet is defined as partially frozen
raindrops or refrozen snowflakes that form into small ice pellets before reaching the ground. They typically
bounce when they hit the ground and do not stick to the surface. However, it does accumulate like snow,
posing similar problems and has the potential to accumulate into a layer of ice on surfaces. Freezing rain,
conversely, usually sticks to the ground, creating a sheet of ice on the roadways and other surfaces.
All of the winter storm elements – snow, sleet, ice, etcetera – have the potential to cause significant hazard
to a community. Even small accumu lations can down power lines and tree limbs and create hazardous
driving conditions. Furthermore, communication and power may be disrupted for days.
https://www.ncdc.noaa.gov/stormevents/
https://www.c2es.org/content/tornadoes-and-climate-change/
71
152
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
According to SC Hazard Mitigation Plan winter weather events in South Carolina can be high -impact incidents
because of their rarity. In the Upstate, two or three winter events with snow or ice accumulation or freezing rain
accretion typically occur per winter season. The Midlands and Pee Dee regions average about one winter
precipitation event per season. There may be several years between winter events in the Lowcountry. Most of
the state averages two inches or less of snowfall each year. The annual snowfall average is higher in the
mountains, with a mean yearly snowfall of five to seven inches at the state’s highest elevations. Winter weather
events that impact South Carolina often include a combination of snow, sleet, and freezing rain.
72
153
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Major disaster declarations
Winter storms (consisting of snow, ice, and cold temperatures) can cause major problems in regions that are not
prepared for them. These types of storms can damage property, create safety risks, destroy crops and valuable
timber, damage infrastructure components such as power lines, and have enormous economic impacts (SCEMD).
There were major Southeastern snowstorms in 1899, 1914, 1973, 2000, and 2002. Additionally, there have been
many more localized winter storms. In January 1968 and February 1979 large i ce storms paralyzed the County
for several days. More recently in 2002, 2004, 2005, and 2014 ice and snowstorms covered the Region resulting
in power outages and hazardous driving conditions. Each County suffers an average of one to two winter storms
each year.
There have been several significant winter storm events within South Carolina designated as “Major Disaster
Declaration”
Severe Weather Storm Incident Start Date: Incident End
Date:
Declared as Major
Disaster:
Winter Storm: DR-4166 2/10/2014 2/15/2014 3/12/2014
Ice Storm: DR-1625 12/15/2005 12/16/2005 1/20/2006
Ice Storm: DR-1509 1/26/2004 1/30/2004 2/13/2004
Ice Storm: DR-1451 12/4/2002 12/6/2002 1/8/2003
Winter Storm: DR-1313 1/22/2000 2/1/2000 1/31/2000
Official website of the Department of Homeland Security (https://www.fema.gov/disasters)
73
154
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
5.3.2 Community Risk Analysis
Ice Storms
In data compiled by FEMA, via the National Risk Index, Anderson County has a relatively high risk of ice storms,
and an expected annual loss of $0.88M, as shown in figure 5.3.2. Oconee county has a relatively high risk of
winter weather, with an expected annual loss of $0.61M as shown in figure 5.3.3.
Figure 5.3.2 Anderson County risk analysis
Figure 5.3.3 Oconee County risk analysis
74
155
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Winter Weather
In data compiled by FEMA, via the National Risk Index, Anderson County has a very low risk of winter weather,
and an expected annual loss of $2.1k, as shown in figure 5.3.5. Oconee county has a relatively moderate risk of
winter weather, with an expected annual loss of $0.12M as shown in figure 5.3.6.
Figure 5.3.5 Anderson County risk analysis
Figure 5.3.6 Oconee County risk analysis
75
156
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Location and Spatial Extent
Nearly the entire continental United States is susceptible to winter storm events. Some ice and winter storms
may be large enough to affect several states while others might affect limited, localized areas. The degree of
exposure typically depends on the normal expected severity of local winter weather. Anderson and Oconee
Counties are accustomed to severe winter weather conditions and often receives winter weather during the
winter months. Given the atmospheric nature of the hazard, all jurisdictions within the counties are uniformly
exposed to winter storms. Current climate models indicate global average temperatures may rise between 4.7
to 8.6 degrees by the end of the century, the increased rate of precipitation events will likely cause an increase
in the frequency and severity of winter storms impacting Anderson and Oconee Counties County in the future.
https://www.c2es.org/content/climate-impacts/
Figure 5.3.7 South Carolina Hazard Risk Score
Historical Occurrences
According to Spatial Hazard Event and Losses Database (SHELDUS) for the United States, Anderson and Oconee
Counties have had a combined 55 winter storm events that have reached a threshold of $50,000. Tables 5.3.8
and 5.3.9 detail those events totaling $36,789,816.80 in total property damage and 1.34 injuries. All data has
been updated to 2020 inflation, and charts provided by SHELDUS reflect this change.
76
157
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Anderson County Extent
Considering the frequency and intensity of winter storm events in Anderson County; the future predictability
frequency and intensity of winter storm events is low as the entire county is equally susceptible to winter storm
events and likely to cause low to moderate crop damage, property damage and or death and injury as shown in
past occurrences over the past 70+ years with the number of event days being 8 days and 2 days event causing
property damage, causing property damage ranging from 5,000 to 5,000 dollars in damage for a total of 10,000
dollars property damage, with zero deaths and injuries.
Storm Events Database
Search Results for Anderson County, South Carolina
Event Types: Winter Storm
Anderson county contains the following zones:
Anderson
8 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 1
Number of Days with Event: 8
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 0
Number of Days with Event and Property Damage: 2
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Anderson County has experienced 15 notable winter weather evens from the time frame of 01/01/1970 through
01/01/2021. A winter weather event is considered notable when it causes at or above $50,000 in combined
property and crop damages. These winter weather events have caused 1.59 fatalities and .67 injuries to county
residents. They caused a collective $21,258,855.88 in property damage and $60,045,920.90 in crop damages
adjusted to 2020 inflation. Data has been provided and adjusted through SHELDUS.
77
158
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Table 5.3.8 Anderson County Notable Winter Weather Events from 1/1/1970-1/1/2021
SHELDUS
Query results
Date Hazard Crop Damage
(ADJ) Fatalities Injuries
Property
Damage
(ADJ)
3/16/17 *Wind/Winter
Weather 52,543,097.72 0 0 0
4/8/07 Winter Weather 3,792,569.38 0 0 0
12/15/05 Winter Weather 0 0 0 268,427.69
12/4/02 Winter Weather 0 0 0 16,027,326.54
1/2/99 Winter Weather 0 0 0 3,146,694.37
3/8/96 Winter Weather 2,784,359.9 0 0 0
3/13/93 Winter Weather 64,784.89 0 0 64,784.89
3/21/90 Winter Weather 217,989.78 0 0 0
2/17/89 Winter Weather 0 0 0 132,116.75
2/17/89 Winter Weather 0 1 0 132,116.75
2/6/79 Winter Weather 601.76 0 0 601,743.91
2/9/73 Winter Weather 641.72 0.2 0 641,695.15
1/7/73 Winter Weather 641,695.15 0 0 64,169.54
3/25/71 Winter Weather 179.79 0.39 0.67 179,780.29
12/3/71
*Severe
Storm/Thunderstorm/
Wind/Winter Weather
70,348.83 0 0 70,348.83
Total $60,116,269.7 1.59 .67 $21,329,204.60
Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University
*Hazard may be repeated in another section
78
159
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Winter Storm Probability and Vulnerability
Anderson County: Winter Weather Probability
County
Number of
Events
Years
Recurrence
Intervals
(years)
Hazard
Frequency (%
change/year)
Anderson 15 50 3.33 30%
Vulnerability
Anderson County
Overall, Anderson County has a moderate level vulnerability to winter storms. The probability of one or more
winter weather events in Anderson County is 30%. Examining past events, it is evident that winter storms can
significantly disrupt normal operations within a community. In addition, some ice storms associated with winter
storms have caused significant property damage and disruption of the electric utilit ies. Overall, when taking
into consideration the moderate level vulnerability of winter storms in the county, and the past history of the
event, the municipalities have a moderate level vulnerability to winter storms.
Recommendation:
Early warnings are possibly the best hope for residents when a winter storm strikes. Citizens must immediately
be aware when a community will be facing a winter storms incident. Communities that do not already possess
warning systems should plan to purchase a system. Storm she lters are another important means of mitigating
the effects of winter storm events. A community-wide shelter program should be considered for residents who
may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm
shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios
to ensure that everyone has sufficient access to information in times of severe weather.
Oconee County Extent
Considering the frequency and intensity of winter storm events in Oconee County; the future predictability
frequency and intensity of winter storm events is low as the entire county is equally susceptible to winter storm
events and likely to cause low to moderate crop damage, property damage and or death and injury as shown in
past occurrences over the past 70+ years with the number of days events being 13 with 2 event days causing
property damage of 5,000 to 5,000 dollars in property damage with a total o f 20,000 in property damage and
zero deaths and injury.
Storm Events Database
Search Results for Oconee County, South Carolina
79
160
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Event Types: Winter Storm
Oconee county contains the following zones:
Oconee Mountains, Greater Oconee
23 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 4
Number of Days with Event: 13
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 0
Number of Days with Event and Property Damage: 2
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Oconee County has experienced 27 notable winter weather events from the time frame of 01/01/1970 through
01/01/2021. A winter weather event is considered notable when it causes at or above $50,000 in combined
property and crop damages. These winter weather events have caused 1.18 fatalities and .67 injuries to county
residents. They caused a collective $15,460,612.2 in property damage and $125,052,531. in crop damages
adjusted to 2020 inflation.
Table 5.3.8: Oconee County Notable Winter Weather Events from 1/1/1970-1/1/2021
SHELDUS
Query results
80
161
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Date Hazard Crop Damage
(ADJ) Fatalities Injuries
Property
Damage
(ADJ)
3/16/17 *Wind/ Winter
Weather 52,543,097.72 0 0 0
3/16/17 *Wind/ Winter
Weather 52,543,097.72 0 0 0
4/8/07 Winter Weather 1,264,189.79 0 0 0
4/8/07 Winter Weather 7,585,138.77 0 0 0
12/15/05 Winter Weather 0 0 0 100,660.38
12/4/02 Winter Weather 0 0 0 7,285,148.43
12/4/02 Winter Weather 0 0 0 2,914,059.37
1/2/99 Winter Weather 0 0 0 3,146,694.37
1/9/97 Winter Weather 0 0 0 65,325.77
3/8/96 Winter Weather 2,784,359.9 0 0 0
3/13/93 Winter Weather 64,784.89 0 0 64,784.89
12/27/92 Winter Weather 33,362.13 0 0 33,362.13
3/21/90 Winter Weather 217,989.78 0 0 0
2/17/89 Winter Weather 0 0 0 132,116.75
2/17/89 Winter Weather 0 0 0 132,116.75
4/10/85 Winter Weather 203,004.67 0 0 0
12/25/83 Winter Weather 28,605.7 0.59 0 28,605.7
4/17/83 Winter Weather 2,860,568.8 0 0 0
4/7/82 Winter Weather 3,395,332.13 0 0 0
3/27/82 Winter Weather 295,247.22 0 0 0
2/6/79 Winter Weather 601.76 0 0 601,743.91
4/11/73 Winter Weather 163,988.78 0 0 0
2/9/73 Winter Weather 641.72 0.2 0 641,695.15
1/7/73 Winter Weather 641,695.15 0 0 64169.54
4/1/72 Winter Weather 356,295.72 0 0 0
3/25/71 Winter Weather 179.79 0.39 0.67 179,780.29
12/3/71
*Severe
Storm/Thunderstor
m/Wind/Winter
Weather
70,348.83 0 0 70,348.83
Total 125,052,531 1.18 .67 15,460,612.20
Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University
Oconee County: Oconee County Winter Weather Probability
81
162
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
County Number of
Events
Number of
Years
Recurrence
Interval (years)
Hazard
Frequency (%
chance/year)
Oconee 27 50 1.85 54%
Vulnerability
Oconee County
Overall, Oconee County has a moderate level of vulnerability to winter storms. The probability of one or more
winter weather events in Oconee County is 54%. Examining past events, it is evident that winter storms can
significantly disrupt normal operations within a community. In addition, some ice storms associated with winter
storms have caused significant property damage and disruption of the electric utilities. Overall, when taking
into consideration the moderate level of vulnerability to winter storms in the county, and the past history of
the event, the municipalities have a moderate level of vulnerability to winter storms.
Recommendations
Early warnings are possibly the best hope for residents when a winter storm strikes. Citizens must immediately
be aware when a community will be facing a winter storms incident. Communities that do not already possess
warning systems should plan to purchase a system. Storm shelters are another important means of mitigating
the effects of winter storm events. A community-wide shelter program should be considered for residents who
may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm
shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios
to ensure that everyone has sufficient access to information in times of severe weather.
5.4 Hail/Thunderstorms
Background
NOAA classifies thunderstorms as a rain-bearing cloud that also produces lightning, along with possible
hail. All thunderstorms are dangerous. Every thunderstorm produces lightning. In the United States,
an average of 300 people are injured and 80 people are killed each year by lightning.
Although most lightning victims survive, people struck by lightning often report a variety of long-term,
debilitating symptoms. Other associated dangers of thunderstorms include tornadoes, strong winds,
hail, and flash f looding. Flash flooding is responsible for more fatalities —more than 140 annually —
than any other thunderstorm-associated hazard.
Hail is frozen droplets of water that thaw and freeze while wind patterns (updrafts and downdrafts)
take them between colder and warmer elevations within a thunderstorm cloud. Each time the droplet
re-freezes, another layer of ice is added to the object, t hus making it larger until it falls to the earth.
82
163
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Hail is a costly result of severe weather in the United States. In an average year, hail causes one billion
dollars in crop and property damage each year in this country.
Unlike ice pellets, hail stones are layered and can be irregular and clumped together. Hail is composed
of transparent ice or alternating layers of transparent and translucent ice at least 1 millim eter
(0.039 in) thick, which are deposited upon the hail stone as it cycles through the cloud multiple times,
suspended aloft by air with strong upward motion until its weight overcomes the updraft and falls to
the ground. There are methods available to de tect hail -producing thunderstorms using weather
satellites and radar imagery. Hail stones generally fall at higher spe eds as they grow in size, though
complicating factors such as melting, friction with air, wind, and interaction with rain and other hail
stones can slow their descent through Earth's atmosphere. Severe weather warnings are issued for
hail when the stones reach a damaging size, as it can cause serious damage to man -made structures
and, most commonly, farmers' crops. In the United States, the National Weather Service issues severe
thunderstorm warnings for hail 1" or greater in diameter. This threshold, effective January 2010,
marked an increase over the previous threshold of ¾" hail. The Service made the change for two main
reasons: a) public complacency and b) recent research suggesting that damage does not occur until a
hailstone reaches 1" in diameter. (NOAA/ National Weather Service National Centers for Environmental
Prediction).
Hailstorms are a potentially damaging outgrowth of severe thunderstorms (thu nderstorms are
discussed separately). Early in the developmental stages of a hailstorm, ice crystals form within a low-
pressure front due to the rapid rising of warm air into the upper atmosphere and the subsequent
cooling of the air mass. Frozen droplets gradually accumulate on the ice crystals until they develop to
a sufficient weight and fall as precipitation. Hail typically takes the form of spheres or irregularly
shaped masses greater than 0.75 inches in diameter. The size of hailstones is a direct fun ction of the
size and severity of the storm. High velocity updraft winds are required to keep hail in suspension in
thunderclouds. The strength of the updraft is a function of the intensity of heating at the Earth’s
surface. Higher temperature gradients re lative to elevation above the surface result in increased
suspension time and hailstone size.3 Table 5.4.1 shows the Tornado and Storm Research Organization’s
(TORRO) Hailstorm Intensity Scale which is a way of measuring hail severity.4
TABLE 5.4.1: TORRO HAILSTORM INTENSITY SCALE
83
164
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Scale Intensity
category
Typical hail
diameter (mm)*
Probable kinetic
energy J m-2
Typical damage
impacts
H0 Hard hail 5 0-20 No damage
H1 Potentially
damaging 5-15 >20
Slight general
damage to plants,
crops
H2 Significant 10-20 >100
Significant damage
to fruit, crops,
vegetation
H3 Severe 20-30 >300
Severe damage to
fruit and crops,
damage to glass
and plastic
structures, paint and
wood scored
H4 Severe 25-40 >500
Widespread glass
damage, vehicle
bodywork damage
H5 Destructive 30-50 >800
Wholesale
destruction of glass,
damage to tiled
roofs, significant risk
of injuries
H6 Destructive 40-60
Bodywork of
grounded aircraft
dented, brick walls
pitted
H7 Destructive 50-75
Severe roof
damage, risk of
serious injuries
H8 Destructive 60-90
(Severest recorded
in the British Isles)
Severe damage to
aircraft bodywork
H9 Super Hailstorms 75-100
Extensive structural
damage. Risk of
severe or even fatal
injuries to persons
caught in the open
H10 Super Hailstorms >100
Extensive structural
damage. Risk of
severe or even fatal
injuries to persons
caught in the open
Source: http://www.torro.org.uk/site/hscale.php
2 https://www.c2es.org/content/drought-and-climate-
change/#:~:text=How%20climate%20change%20contributes%20to,the%20timing%20of%20water%20availability.
3 https://www.nssl.noaa.gov/education/svrwx101/hail/
4 https://www.torro.org.uk/v2021/ 5 https://www.weather.gov/phi/ThunderstormDefinition
Community Risk Analysis
Hail Risk Analysis
84
165
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
In data compiled by FEMA, via the National Risk Index, Anderson County has a relatively low risk of
hail, and an expected annual loss of $0.18M, as shown in figure 5.4.2. Oconee county has a relatively
low risk of hail, with an expected annual loss of $0.11M as shown in figure 5.4.3.
Figure 5.4.2 Anderson County risk analysis
Figure 5.4.3 Oconee County risk analysis
Location and Spatial Extent
85
166
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Hailstorms frequently accompany thunderstorms, so their locations and spatial extents coincide. Due
to the large spatial extent of thunderstorms and their paths relative to the area of Anderson and
Oconee Counties, it is assumed that all jurisdictions within Anderson and Oconee Counties are
uniformly exposed to severe thunderstorms. Additionally, bec ause there is no clear distinction
between thunderstorms that produce hailstones and thunderstorms that do not, all areas of the
county are equally exposed to hail with that in mind, Figure 5.4.4 and 5.4.5 shows the location of hail
events that have impacted the county between 1955 and 2021. Furthermore, the link between climate
change and increases in the frequency and severity of extreme precipitation events indicates
hailstorms may increase in frequency and magnitude within Anderson and Oconee Counties.
Figure 5.4.4 Anderson County Hail events 1955-2017
https://fema.maps.arcgis.com/apps/webappviewer/index.html?id=90c0c996a5e242a79345cdbc5f758fc6#
Figure 5.4.5 Oconee County Hail events 1955-2017
86
167
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
https://fema.maps.arcgis.com/apps/webappviewer/index.html?id=90c0c996a5e242a79345cdbc5f758fc6#
Historical Occurrences
According to Spatial Hazard Event and Losses Database (SHELDUS) for the United States Anderson and Oconee
Counties have had a combined 54 hailstorm events that have reached a threshold of $50,000. Tables 5.4.6 and
5.4.7 detail those events totaling $18,581,122.47 in total property damage and 5.89 injuries. All data has been
updated to 2020 inflation, and charts provided by SHELDUS reflect this change.
Anderson County
87
168
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Extent
Considering the frequency and intensity of Hail Storms in Anderson County; the future predictability frequency
and intensity of hail storms is moderate as the entire county is equally susceptible to hail storms and likely to
cause low to moderate crop dam age, property damage and or death and injury as shown in past occurrences
over the past 70+ years with the number of event days being 137 days and 2 event days causing property
damage ranging from 100 to 200,000 dollars in damage with a total of over 300,000 dollars in property damage,
with zero deaths and injuries and hail size ranging from .75 inches (penny size) to 4.00 inches (grapefruit size).
Storm Events Database
Search Results for Anderson County, South Carolina
Event Types: Hail
214 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 2
Number of Days with Event: 137
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 0
Number of Days with Event and Property Damage: 2
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Approximate Hail Size:
Appearance Approximate Size in Inches
Pea 0.25 - 0.50 inch
Penny 0.75 inch
Nickel 0.88 inch
Quarter 1.00 inch
Half Dollar 1.25 inch
Walnut/Ping Pong 1.50 inch
Golf ball 1.75 inch
Hen Egg 2.00 inch
Tennis Ball 2.50 inch
Baseball 2.75 inch
Tea Cup 3.00 inch
Grapefruit 4.00 inch
88
169
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Softball 4.50 inch
National Centers for Environmental Information (NCEI) (noaa.gov)
Considering the frequency and intensity of Thunderstorm wind in Anderson County; the future predictability
frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to
Thunderstorm wind and likely to cause moder ate crop damage, property damage and or death and injury as
shown in past occurrences over the past 70+ years with the number of event days being 342 days and 59 event
days causing property damage ranging from 1,000 to 500,000 totaling over 4.207 million dollars in damage, with
1 deaths and 15 injuries, with wind speeds ranged from 50 to 75 kts.
Storm Events Database
Search Results for Anderson County, South Carolina
Event Types: Thunderstorm Wind
483 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 2
Number of Days with Event: 342
Number of Days with Event and Death: 1
Number of Days with Event and Death or Injury: 7
Number of Days with Event and Property Damage: 59
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Anderson County has experienced 36 notable hailstorms and thunderstorms from the time frame of 01/01/1970
through 01/01/2021 A hailstorm/thunderstorm is considered notable when it causes at or greater than $50,000
in combined property and crop damages. These 36 notable hailstorms have caused 5.36 injuries to county
residents and 0 .05 fatalities. These notable hailstorms have caused a collective $11,053,028.99 in property
damage and $589,847.26 in crop damage, adjusted for 2020 inflation.
Table 5.4.6: Anderson County Notable Hailstorms/ Thunderstorms from 1/1/1970-1/1/2021
SHELDUS
Query results
89
170
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Date Hazard
Crop
Damage
(ADJ)
Fatalities Injuries Property
Damage (ADJ)
9/18/75
*Flooding/ Lightning/
Severe
Storm/Thunderstorm
12,180.28 0.5 1.5 1,218,028.07
10/8/76 *Flooding/ Severe
Storm/Thunderstorm 38,388.92 0 0.33 383,889.32
7/3/14 Hail 0 0 0 221,444.68
7/13/03 Hail 0 0 0 142,456.33
4/23/87 Hail 11,536.96 0 0 115,369.56
6/10/82
*Hail/ Lightning/ Severe
Storm/Thunderstorm/
Wind
331,251.92 0 0.2 331,251.92
7/25/93
*Hail/ Severe
Storm/Thunderstorm/
Wind
0 0 2 90,698.84
7/8/93
*Hail/ Severe
Storm/Thunderstorm/
Wind
0 0 0 181,397.67
4/4/89
*Hail/ Severe
Storm/Thunderstorm/
Wind
0 0 0 105693.4
2/21/93 *Hail/ Tornado 0 0 0 90,,698.84
4/4/89 *Hail/ Tornado 0 0 0 1,056,934.03
3/28/84 *Hail/ Wind 126,140.35 0 0 1,261,403.47
9/2/70 *Lightning/ Severe
Storm/Thunderstorm 0 0 0 337,783.04
3/23/79 *Severe
Storm/Thunderstorm 0 0 1.33 60,174.4
7/21/18
*Severe
Storm/Thunderstorm/
Wind
0 0 0 52,192.82
4/5/17
*Severe
Storm/Thunderstorm/
Wind
0 0 0 105,086.2
5/12/16
*Severe
Storm/Thunderstorm/
Wind
0 0 0 53,631.01
7/18/15
*Severe
Storm/Thunderstorm/
Wind
0 0 0 221182.14
6/25/10
*Severe
Storm/Thunderstorm/
Wind
0 0 0 120,207.49
90
171
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
6/15/10
*Severe
Storm/Thunderstorm/
Wind
0 0 0 300,518.72
7/3/05
*Severe
Storm/Thunderstorm/
Wind
0 0 0 53,685.54
6/6/05
*Severe
Storm/Thunderstorm/
Wind
0 0 0 53,685.54
11/11/02
*Severe
Storm/Thunderstorm/
Wind
0 0 0 145,702.97
7/4/01
*Severe
Storm/Thunderstorm/
Wind
0 0 0 2,220,098.59
6/13/01
*Severe
Storm/Thunderstorm/
Wind
0 0 0 740,032.86
8/24/00
*Severe
Storm/Thunderstorm/
Wind
0 0 0 152,218.14
1/7/98
*Severe
Storm/Thunderstorm/
Wind
0 0 0 160,809.6
6/26/94
*Severe
Storm/Thunderstorm/
Wind
0 0 0 88,434.43
2/10/90
*Severe
Storm/Thunderstorm/
Wind\
0 0 0 100275.3
5/5/89
*Severe
Storm/Thunderstorm/
Wind
0 0 0 105,,693.4
8/1/88
*Severe
Storm/Thunderstorm/
Wind
0 0 0 110,785.99
7/2/83
*Severe
Storm/Thunderstorm/
Wind
0 0 0 131,586.16
12/3/71
*Severe
Storm/Thunderstorm/
Wind/Winter Weather
70,348.83 0 0 70,348.83
7/13/13
*Severe
Storm/Thunderstorm/
Wind
0 0 0 112,518.46
Total 589,847.26 0.5 5.36 11,053,028.99
Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University
91
172
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
*Hazard may be repeated in another section
Anderson County Probability of a Hailstorm/ Thunderstorm
County Number of Events Number of Years Recurrence
Interval (years)
Hazard Frequency
(% chance/year)
Anderson 36 55 1.53 65%
Vulnerability
Anderson County
Overall, Anderson County has a low vulnerability to hailstorms. There is a 65% probability that more than one
hail producing storm will occur in Anderson County in a year time frame. Based on passed events, the hailstorms
have caused some damage within the County. Overall, the County’s vulnerability to a damaging event is low.
Recommendation:
Early warnings are possibly the best hope for residents when hailstorms strike. Citizens must immediately be
aware when a community will be facing a severe weather incident. Communities that do not already possess
warning systems should plan to purchase a system. Storm shelters are another important means of mitigating
the effects of hailstorm events. A community -wide shelter program should be considered for residents who
may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm
shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios
to ensure that everyone has sufficient access to information in times of severe weather.
Oconee County
Extent
Considering the frequency and intensity of Hail Storm events in Oconee County; the future predictability
frequency and intensity of hail storm events is moderate as the entire county is equally susceptible to hail storm
events and likely to cause moderate property damage and low to moderate crop damage, and or death and
injury as shown in past occurrences over the past 70+ years with the number of event days being 120 days and
1 event days causing property damage of 500,000 dollars in damage, with zero deaths and injuries and hail size
ranging from .75 (penny size) inches to 2.75 inches (baseball size).
Storm Events Database
Search Results for Oconee County, South Carolina
Event Types: Hail
92
173
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
194 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 2
Number of Days with Event: 120
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 0
Number of Days with Event and Property Damage: 1
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Approximate Hail Size:
Appearance Approximate Size in Inches
Pea 0.25 - 0.50 inch
Penny 0.75 inch
Nickel 0.88 inch
Quarter 1.00 inch
Half Dollar 1.25 inch
Walnut/Ping Pong 1.50 inch
Golf ball 1.75 inch
Hen Egg 2.00 inch
Tennis Ball 2.50 inch
Baseball 2.75 inch
Tea Cup 3.00 inch
Grapefruit 4.00 inch
Softball 4.50 inch
National Centers for Environmental Information (NCEI) (noaa.gov)
Considering the frequency and intensity of Thunderstorm wind in Oconee County; the future predictability
frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to
Thunderstorm wind and likely to cause moderat e crop damage, property damage and or death and injury as
shown in past occurrences over the past 70+ years with the number of event days being 242 days and 41 event
93
174
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
days causing property damage ranging from 1,000 to 500,000 totaling over 1.106 million dollars in damage, with
0 deaths and 2 injuries, with wind speeds ranged from 50 to 60 kts.
Storm Events Database
Search Results for Oconee County, South Carolina
Event Types: Thunderstorm Wind
306 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 2
Number of Days with Event: 242
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 2
Number of Days with Event and Property Damage: 41
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Oconee County has experienced 16 notable hailstorms/thunderstorms from the time frame of 01/01/1970
through 01/01/2021. A hailstorm/ thunderstorm is considered notable when it causes at or greater than
$50,000 in combined property and crop damages. These 16 notable hailstorms have caused 0.53 injuries to
county residents and 0.00 fatalities. These notable hailstorms have caused a collective $7,528,093.4 in property
damage and $1,368,135,59 in crop damage, adjusted for 2020 inflation.
Table 5.4.7: Oconee County Notable Hailstorms/ Thunderstorms from 1/1/1970-1/1/2021
SHELDUS
Query results
Date Hazard Crop Damage
(ADJ) Fatalities Injuries Property
Damage (ADJ)
8/6/78 *Flooding/ Severe
Storm/Thunderstorm 5,025.3 0 0 502,529.99
10/8/76 *Flooding/ Severe
Storm/Thunderstorm 38,388.92 0 0.33 383,889.32
9/13/73 *Flooding/ Severe
Storm/Thunderstorm 4,919.64 0 0 4,919,662.91
4/28/02 Hail 0 0 0 728,514.84
6/10/82
*Hail/ Lightning/ Severe
Storm/Thunderstorm/
Wind
331,251.92 0 0.2 331,251.92
7/4/75 *Hail/ Lightning/Wind 69,601.58 0 0 6,960.15
94
175
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
5/10/75 *Hail/ Lightning/Wind 135,336.46 0 0 13,533.66
6/14/74 *Hail/ Lightning/Wind 531,682.84 0 0 531.68
5/22/79 *Hail/ Severe
Storm/Thunderstorm 180,523.17 0 0 1,805.23
4/4/89 Hail/ Tornado/ Wind 1,056.93 0 0 105,693.4
6/5/89
*Lightning/ Severe
Storm/Thunderstorm/
Wind
0 0 0 105,693.4
4/28/02
*Severe
Storm/Thunderstorm/
Wind
0 0 0 72,851.48
3/27/94
*Severe
Storm/Thunderstorm/
Wind
0 0 0 88,434.43
7/27/93
*Severe
Storm/Thunderstorm/
Wind
0 0 0 90,698.84
6/5/89
*Severe
Storm/Thunderstorm/
Wind
0 0 0 105,693.4
12/3/71
*Severe
Storm/Thunderstorm/
Wind/ Winter Weather
70,348.83 0 0 70,348.83
Total 1,368,135.59 0 .53 7,528,093.48
Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University
Oconee County Probability of a Hailstorm/Thunderstorm
County Number of Events Number of Years Recurrence
Interval (years)
Hazard Frequency
(% chance/year)
Oconee 16 55 3.44 29%
Vulnerability
Oconee County
Overall, Oconee County has a low vulnerability to hailstorms. There is a 29% probability that more than one hail
producing storm will occur in Oconee County in a year time frame. Based on past events, the hailstorms have
caused some damage within the County. Overall, the County’s vulnerability to a damaging event is low.
Recommendation:
95
176
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Early warnings are possibly the best hope for residents when hailstorms strike. Citizens must immediately be
aware when a community will be facing a severe weather incident. Communities that do not already possess
warning systems should plan to purchase a system. Storm shelters are another important means of mitigating
the effects of hailstorm events. A commu nity-wide shelter program should be considered for residents who
may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm
shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios
to ensure that everyone has sufficient access to information in times of severe weather.
5.5 Lightning/Thunderstorms
Background
The formation of lightning is still something of a mystery. Even the perceived motion of lightning is false. The
light that seems to come down from the sky actually jumps up from the earth’s surface. Lightning bolts are
triggered when a negatively charged cloud base induces a positive charge in the ground. Negative particles,
small streaming sparks known as stepped leaders, begin to flow downward, creating a conductive channel an
inch or two wide. At the same time, similar streamers are moving upward from t he ground, especially high
places like treetops and tall structures. When the two streamers meet, they form a channel and a subsequent
lightning bolt. The bright flash of light happens when the electrical charge excites air molecules in its path,
forcing them to release light.
Lightning travels up to 60,000 miles per hour, cutting a jagged path through the air as much as 10 miles long! A
lightning flash is brighter than ten million 100-watt light-bulbs, and contains billions of watts – as much power
as in all the electricity plants in the United States.
Lightning causes damage to buildings and equipment in three different ways. First, there can be damage caused
by a direct lightning strike. Such damage include damage to roofing materials, structures such as chimneys,
heating or air conditioning units located on the roof or exterior of a building, or fires caused by lightning igniting
combustible material, such as wood-frame buildings or flammable liquids or vapors.
Second, part of the lightning cur rent can be carried inside a building by electric power, telephone, analog or
digital data lines (e.g., closed circuit television cameras, sensors in an industrial plant, etc.). This direct injection
of lightning current inside a building can cause immense damage to electrical – and especially electronic –
circuits and equipment.
Finally, the electromagnetic fields from the current in a lightning stroke can induce currents and voltage in wire
and cables inside a building. Such surge currents are typicall y less intense than direct injection of current, but
can easily vaporize integrated circuits in computers, modems, electronic control circuits, etc.
Electronic equipment is typically designed to operate in a well -controlled electrical environment. It i s the
responsibility of the user to install lighting protection, electrical surge -protective devices, and power
conditioning equipment to mitigate the effects of disturbances in the electrical voltage waveform. It is well
recognized that the trend toward i ntegrated circuits with more transistors per unit area, and faster switching
speeds, makes these circuits more vulnerable to both upset and damage.
Damage is a permanent alteration in the physical properties of one or more components, that requires repair
or replacement before the equipment can resume normal operation. Examples of lightning damage to electrical
96
177
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
equipment include flashover of insulation insi de motors or transformers, so that the equipment is no longer
functional. Examples of lightning damage to electronic equipment includes vaporized traces on printed circuit
boards, vaporized transistors and integrated circuits, blown fuses, etc.
Anderson
Extent
Considering the frequency and intensity of Lightning in Anderson County; the future predictability frequency
and intensity of Lightning is low to moderate as the entire county is equally susceptible to Lightning and likely
to cause low to moderate crop damage, property damage and or death and injury as shown in past occurrences
over the past 70+ years with the number of event days being 18 days and 10 event days causing property
damage ranging from 1,000 to 100,000 totaling over 5.408 milli on dollars in damage, with 0 deaths and 5
injuries.
Storm Events Database
Search Results for Anderson County, South Carolina
Event Types: Lightning
19 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 1
Number of Days with Event: 18
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 4
Number of Days with Event and Property Damage: 10
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Considering the frequency and intensity of Thunderstorm wind in Anderson County; the future predictability
frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to
Thunderstorm wind and likely to cause moder ate crop damage, property damage and or death and injury as
shown in past occurrences over the past 70+ years with the number of event days being 342 days and 59 event
days causing property damage ranging from 1,000 to 500,000 totaling over 4.207 million dollars in damage, with
1 deaths and 15 injuries, with wind speeds ranged from 50 to 75 kts.
Storm Events Database
97
178
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Search Results for Anderson County, South Carolina
Event Types: Thunderstorm Wind
483 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 2
Number of Days with Event: 342
Number of Days with Event and Death: 1
Number of Days with Event and Death or Injury: 7
Number of Days with Event and Property Damage: 59
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Anderson County has experienced 5 notable Lightning Severe Storms/ Thunderstorms from the time frame of
01/01/1960 through 12/31/2021. A Lightning Severe Storm/ Thunderstorm is considered notable when it causes
at or greater than $50,000 in combined property and crop damages. These 5 notable lightning storms/
thunderstorms have caused no injuries to county residents and no fatalities. These notable storms have caused
a collective $5.35 million in property damage and $0 in crop damage, adjusted for 2023 inflation.
The previous 5 notable occurrences of lightning severe storms/thunderstorm events happened throughout
Anderson County, signifying that each area/municipality of the County is equally at risk for another future
notable event.
5.5.1 Anderson Lightning Data
Year Hazard Location Injuries Fatalities Property
Damage
Crop
Damage
5/25/1996 Lightning Anderson County 0 0 5.000M 0.00K
6/19/1996 Lightning Anderson County 0 0 150.00K 0.00K
7/5/1999 Lightning Anderson County 1 0 0.00K 0.00K
7/6/1999 Lightning Anderson County 0 0 0.00K 0.00K
8/13/1999 Lightning Anderson County 0 0 0.00K 0.00K
6/13/2001 Lightning Anderson County 0 0 0.00K 0.00K
6/25/2001 Lightning Anderson County 0 0 0.00K 0.00K
7/4/2001 Lightning Anderson County 0 0 0.00K 0.00K
8/24/2002 Lightning Anderson County 1 0 0.00K 0.00K
8/25/2002 Lightning Anderson County 1 0 0.00K 0.00K
8/16/2003 Lightning Anderson County 0 0 1.00K 0.00K
7/8/2008 Lightning Anderson Count 0 0 50.00K 0.00K
3/12/2010 Lightning Anderson County 0 0 15.00K 0.00K
98
179
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
3/28/2010 Lightning Anderson County 2 0 5.00K 0.00K
6/15/2010 Lightning Anderson County 0 0 20.00K 0.00K
6/15/2011 Lightning Anderson County 0 0 50.00K 0.00K
8/12/2011 Lightning Anderson County 0 0 100.00K 0.00K
8/12/2011 Lightning Anderson County 0 0 10.00K 0.00K
8/14/2021 Lightning Anderson County 0 0 7.00K 0.00K
5 5.408M
Source: NOAA Storm Events Database
The previous 5 notable occurrences of lightning severe storms/thunderstorm events happened throughout Anderson
County, signifying that each area/municipality of the County is equally at risk for another future notable event.
Oconee
Extent
Considering the frequency and intensity of Lightning in Oconee County; the future predictability frequency and
intensity of Lightning is low as the entire county is equally susceptible to Lightning and likely to cause low crop
damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with
the number of event days being 12 days and 6 event days causing property damage ranging from 5,000 to
80,000 totaling over 751,000 dollars in damage, with 0 deaths and 4 injuries.
Storm Events Database
Search Results for Oconee County, South Carolina
Event Types: Lightning
13 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 1
Number of Days with Event: 12
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 2
Number of Days with Event and Property Damage: 6
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Considering the frequency and intensity of Thunderstorm wind in Oconee County; the future predictability
frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to
99
180
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Thunderstorm wind and likely to cause moderate crop damage, property damage and or death and injury as
shown in past occurrences over the past 70+ years with the number of event days being 24 2 days and 41 event
days causing property damage ranging from 1,000 to 500,000 totaling over 1.106 million dollars in damage, with
0 deaths and 2 injuries, with wind speeds ranged from 50 to 60 kts.
Storm Events Database
Search Results for Oconee County, South Carolina
Event Types: Thunderstorm Wind
306 events were reported between 01/01/1950 and 01/31/2023 (26694 days)
Summary Info:
Number of County/Zone areas affected: 2
Number of Days with Event: 242
Number of Days with Event and Death: 0
Number of Days with Event and Death or Injury: 2
Number of Days with Event and Property Damage: 41
Number of Days with Event and Crop Damage: 0
Number of Event Types reported: 1
National Centers for Environmental Information (NCEI) (noaa.gov)
Oconee County has experienced 4 notable Lightning Severe Storms/ Thunderstorms from the time frame of
01/01/1960 through 12/31/2021. A Lightning Severe Storm/ Thunderstorm is considered notable when it causes
at or greater than $50,000 in combined property and crop damages. These 5 notable lightning storms/
thunderstorms have caused no injuries to county residents and no fatalities. These notable storms have caused
a collective $5.35 million in property damage and $0 in crop damage, adjusted for 2023 inflation.
5.5.2 Oconee County Lightning Data
100
181
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
Year Hazard Location Injuries Fatalities Property
Damage
Crop
Damage
3/6/1996 Lightning Oconee County 0 0 75.00K 0.00K
3/16/1996 Lightning Oconee County 0 0 0.00K 0.00K
5/26/1996 Lightning Oconee County 1 0 0.00K 0.00K
7/22/1997 Lightning Oconee County 0 0 0.00K 0.00K
9/21/2000 Lightning Oconee County 0 0 0.00K 0.00K
8/18/2004 Lightning Oconee County 0 0 80.00K 0.00K
4/22/2005 Lightning Oconee County 0 0 1.00K 0.00K
7/27/2008 Lightning Oconee County 0 0 500.00K 0.00K
6/18/2011 Lightning Oconee County 1 0 0.00K 0.00K
8/6/2012 Lightning Oconee County 1 0 5.00K 0.00K
8/6/2012 Lightning Oconee County 0 0 20.00K 0.00K
9/6/2014 Lightning Oconee County 0 0 0.00K 0.00K
7/14/2017 Lightning Oconee County 0 0 70.00K 0.00K
3 751.00K
Source: NOAA Storm Events Database
5.6 Tornadoes/ High Winds
Background
A tornado is a “violently rotating column of air extending from a thunderstorm to the ground” (NOAA).
Tornadoes can be extremely violent storms that can have relatively low wind speeds (less than 73 mph) to very
high winds in excess of 300 miles per hour. In the South, tornadoes touch down most frequently from the month
of March through May (NOAA). Since 1950, there have been numerous tornadoes in South Carolina. The State
averages approximately eleven tornadoes a yea r, which ranks twenty -sixth in the nation for tornado strikes.
Tornadoes have claimed no casualties in South Carolina, and have injured 3 residents since 1950 (SCEMD).
The following Enhanced Fujita Scale for Tornado Damage explains tornado classifications, wind speeds, and a
typical damage description of the various categories of tornadoes.
Table 5.6.1 Enhanced Fujita Scale
101
182
SECTION 5: HAZARD PROFILES
Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan
March 2023
.
Parameters
The seven categories for the EF scale are listed below, in order of increasing intensity. Although the wind speeds and photographic damage
examples have been updated, the damage descriptions given are based on those from the Fujita scale, which are more or less still accurate.
However, for the actual EF scale in practice, damage indicators (the type of structure which has been damaged) are predominantly used in
determining the tornado intensity.[9]
Scale
Wind speed
estimate[10]
Frequency[11] Potential damage Example of damage
mph km/h
EFU N/A N/A 3.11%
No surveyable damage.
Intensity cannot be determined due to a lack of information. This
rating appli
Text truncated. Open the original for the full document.
Source: City of Westminster website. First collected Oct 23, 2026.