RecordWell Data

08082023 AGENDA PACKET ONLINE

City of Westminster · Oconee County · meeting of Oct 26, 2023 · Agenda packets

Open the original document More from City of Westminster

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CITY OF WESTMINSTER REGULARLY SCHEDULED MEETING August 8, 2023 @ 6:00 PM Westminster Fire Department 216 Emergency Lane, Westminster C all to Order I nvocation & Pledge of Allegiance C ertification of Quorum P ublic Comments: The floor is now open for public comments. Citizens of Westminster or others who have registered for time with the Clerk can now address Council for any matters on tonight’s agenda or other matters you wish to bring before the Council. Speakers are allowed up to 3 minutes and possibly longer if that Speaker is recognized in advance as representing a larger group with similar concerns. To preserve the decorum of this public meeting, and to allow adequate time for discussion among the elected membership of City Council, this will be the only time we will receive unsolicited comments tonight from the public. C omments from the Mayor and Council R outine Business 1. Approval of the June 13, 2023, Regular Meeting Minutes 2. Comments from the Utilities Director a. Downtown maintenance b. Downtown parking strippin g c. ot her 3. Comments from City Administrator a. USDA-RD Water System Project b. Anderson Park renovation update c. Website update d. Hall Road Community Park update e. Other Old Business 4. C onsideration of Second Reading of ORDINANCE #2023-08-08-01 CITY OF WESTMINSTER; AN ORDINANCE AMENDING SECTION 50.01 OF THE CITY OF WESTMINSTER CODE OF ORDINANCES REGARDING THE ANNEXATION OF PROPERTIES LOCATED OUTSIDE OF THE CITY AS A CONDITION TO FO R TH E CITY TO PROVIDE CERTAIN UTILITY SERVICES, AND OTHER MATTERS RELATED THERETO. I n May of 2021 the Council passed Ordinance No. 2021-05-11-01 stipulating the use of annexation covenants when approving electric, water or sewer service(s) of properties located out the City. This Ordinance and the additional documentation are provided for 1 the amendment. Staff presents this consideration at the suggestion of legal counsel for two reasons: Electric service is removed from the language. This will simplify future considerations of potential operations and/or maintenance agreements with a third party (i.e. removal of electric service simplifies future contractual agreements). Insertion of language to clarify the intent and practice of collecting annexation covenants for “New Services.” T here are three documents offered for this item. The first is the Ordinance which amends the City Code (edits are noted to the right side of the page); the second is a revised Declaration of Annexation Covenants which is used when a service agreement is accepted; and the third is an edited version of Section 50.01 of the City’s Code (edits are noted on the right side of the page). St aff recommends approval. N ew Business 5. C o nsideration of ORDINANCE NO. 09-12-2023-01; AN ORDINANCE TO REZONE A CE RTAIN PARCEL IN THE CITY OF WESTMINSTER FROM R-25 (ONE- FAMILY RESIDENTIAL) TO MFR (MULTI-FAMILY RESIDENTIAL). The Westminster Planning Commission met on Monday, July 17, 2023, to consider two items for recommendation for City Council. This ordinance is for the Consideration of Zoning Amendment Application 2023-001 by Jonathan Terry for 104 Highlands Ave from R-25 to MFR. The applicant presented site plans and the Amendment Application to the commission and stated that he planned to develop duplexes and small, high density single-family units on the 11.5 Acre property. Applicant intends to sell the homes for about $220,000-$230,000 after development. The Commission asked questions about greenspace, density of units, and continuity of adjacent properties. Applicant said that he intended to incorporate greenspace into the final design plan, likely around the currently abandoned home on the property at the end of Dickson St. Applicant and commission agreed that current zoning regulations, even for MFR, would not allow an overly dense development. The MFR designation would match the zoning of two adjacent HUD supported housing complexes. The Commission recommended approval of the Application, by a vote of 5-0 (unanimous). Additional information from the meeting is included in the attached. Staff recommends approval. 6. C onsideration of ORDINANCE NO. 09-12-2023-02; AN ORDINANCE TO REZONE A CE RTAIN PARCEL IN THE CITY OF WESTMINSTER FROM R-15 (ONE- FAMILY RESIDENTIAL) TO MFR (MULTI-FAMILY RESIDENTIAL). 2 Consideration of Zoning Amendment Application 2023-002 by the City of Westminster for 115 Riley Ave from R-15 to MFR. The City, applicant and owner, has agreed to convey the property to Westminster Hope ComeUnity, a local nonprofit group, contingent upon rezoning to MFR. Westminster Hope ComeUnity seeks to use the vacant lot, formerly the City Recycling Center, to build three small single-family homes for individuals and families who are without a home for several months while they prepare for and find a permanent residence. The proposed structures would not serve as a “homeless shelter” and beneficiaries will have to complete an application, a drug screening, and have no record of violent crimes (including being a sex offender or convicted of other serious crimes. The Commission did not recommend approval of the application to council, and members cited concerns about location (proximity of a vulnerable population to the HUD supported housing) and ability of the organization to properly manage the project (citing inexperience, not intention as a basis). The Commission did not recommend approval of the Application by a vote of 2-2 (1 abstention). Additional information from the meeting is included in the attached. Staff recommends approval. 7. Consideration of ORDINANCE NO. 09-12-2023-03; AUTHORIZING AN EQ UIPMENT LEASE PURCHASE AGREEMENT IN THE AMOUNT OF NOT EXCEEDING $540,000 BETWEEN THE CITY OF WESTMINSTER, SOUTH CAROLINA, AND FIRSTCITIZENS BANK & TRUST COMPANY, TO DEFRAY T HE COST OF ACQUIRING CERTAIN EQUIPMENT; AND OTHER MATTERS RELATING THERETO. The City’s FY2023-2024 Annual Budget includes the equipment listed below to be purchased using lease-purchase financing. First Citizens Bank offers a competitive lease- purchase financing product that meets the requirements of South Carolina law for municipal financing. The City’s bond Counsel, Mike Burns and Brandon Norris with the Burr Foreman law firm have reviewed and approved of the financing documents, they also wrote the ordinance. Equipment Estimated Cost Two (2) Police Vehicles $ 90,000 One (1) Public Works Vehicle $ 44,045 One (1) Water Pickup $ 46,000 One (1) Sewer Tractor $ 55,000 One (1) Leaf Truck $277,000 TOTAL ESTIMATED COST $512,045 The not-to-exceed lease-purchase financing of $540,000 includes closing costs. The final amount will be determined at closing. The interest rate is fixed and is bank-qualified at 4.48% for 5 years. There are no fees for pre-payment. 3 Staff recommends approval. 8. Consideration of ORDINANCE NO. 09-12-2023-04; AN ORDINANCE TO ESTABLISH A REGISTRATION FOR VACANT AND ABANDONED BUILDINGS, TO AMEND THE CITY’S CODE OF ORDINANCES IN CONNECTION TH EREWITH, AND OTHER MATTERS RELATED THERETO. Vacant properties have a greater potential than occupied properties to cause significant and costly problems for the City. These properties often require greater levels of service from law enforcement, codes enforcement, and other City services and, thereby create a financial burden for the City and detract from the quality of life of the surrounding neighborhoods and the City as a whole. Vacant buildings are an impediment to neighborhood redevelopment and rehabilitation, decrease property values, and prevent neighborhood stabilization. Vacant properties have a greater likelihood of becoming unsightly, structurally unsound, and otherwise dangerous; of attracting criminal activity, and of otherwise creating a threat to public health, safety, and welfare of neighboring properties and the general public. One mechanism for addressing these types of properties is a registry system that compels property owners to register their properties with the City. A fee schedule enhances the registry system. This ordinance establishes the registry system. Staff recommends approval. 9. C onsideration of RESOLUTION NO. 08-08-2023-01; A RESOLUTION ADOPTING THE EMERGENCY OPERATIONS PLAN AND EMERGENCY PREPAREDNESS GUIDELINES; AND OTHER MATTERS RELATED THERETO O n November 15, 2023, City Councial adopted the City of Westminster Emergency Operations Plan and Emergency Preparedness Guidelines (EOP). In March 2023 the Multi-Jurisdictional Hazard Mitigation Plan, Anderson and Oconee County was adopted. T his Resolution strengthens the City’s EOP by incorporating the Multi-Jurisdictional Hazard Mitigation Plan Anderson and Oconee County as part of the City’s emergency preparedness plans. T he purpose of these collective plans is to establish policies and procedures which in the event of a man-made or natural disaster will allow for the most effective utilization of resources within the City and minimize the loss of life and/or injury or loss of property. St aff recommends approval. 10. Co nsideration of RESOLUTION NO. 08-08-2023-02; A RESOLUTION APPROVING THE EXECUTION AND DELIVERY OF A MEMBERSHIP AGREEMENT BETWEEN THE CITY OF WESTMINSTER AND THE SOUTH CAROLINA ASSOCIATION OF MUNICIPAL POWER SYSTEMS (“SCAMPS”); APPROVING THE EXECUTION AND DELIVERY OF A SERVICES AGREEMENT BETWEE N 4 SCAMPS AND THE MUNICIPAL ASSOCIATION OF SOUTH CAROLINA; AND OTHER MATTERS RELATED THERETO The City is a member of the South Carolina Association of Municipal Power Systems (SCAMPS). Membership in the SCAMPS is important for various reasons, especially for mutual aid organization and assistance. At the SCAMPS Annual Meeting on June 6, 2023, 16 of the 20 SCAMPS members approved in concept the SCAMPS Membership and Services Agreements, subject to the approval of their elected board or council. Of note is SCAMPS plans to hire a full-time staff member, which will be managed by the Municipal Association of South Carolina (MASC). Westminster’s previous dues were $451.50 per year. Under the new agreement Westminster’s due will increase to $2,370.76 for the first of a three-year agreement. Dues will then increase to $2,430.03 for FY2025 and $2,490.78 for FY2026. The prevailing thought amongst many of the SCAMPS members is that a full-time staff person will enhance each member’s ability to respond to federal, state and local challenges. Westminster’s proposed FY2024 Budget includes funds to cover the proposed $2,370.76 dues. The next step in making the desired changes with SCAMPS is the approval of the attached corporate resolution by each member's board or council by August 4, 2023 (the Municipal Association of South Carolina is aware Westminster’s City Council Meeting is August 8, 2023 and has granted Westminster an allowance for the additional days). The resolution authorizes the designated officials for each member to execute and deliver the membership agreement between the member and the SCAMPS and approves a services agreement between SCAMPS and the Municipal Association of SC. Attached are the SCAMPS Membership and Services Agreements. Staff recommends approval. 11. Consideration of an action to designate the proceeds of $71,500 payment from Pioneer Rural Water District of Oconee and Anderson Counties for 3.7 mile water line. At the September 13, 2022, City Council Meeting, the Council approved an Agreement for the Transfer of Water Line to Pioneer Rural Water District of Oconee and Anderson Counties for $71,500 for a “water line running 3.7 miles from the intersection of Hwy 24 and S. Hampton St. (34.64830 – 83.07407) to the intersection of Fire Tower Rd. and Hwy 24. (34.61092 – 83.03943) in Westminster.” On June 22, 2023, City staff receipted the payment for the transaction. The funds from this transaction are not budgeted for revenue in the FY2023-2024 Annual Budget. For Council’s consideration: 1) Receive the funds with no additional action thereby allowing the fund balance of water system fund (the Combined Utility Fund) to increase. 5 2) Designate the funds for a particular project or other endeavor. 3) Another action as Council may direct. 12. Consideration of proposal from Seamon Whiteside (SW+) for Westminster Downtown Streetscape Improvements | Phase I The 2023 downtown master plan was accepted by City Council on April 18, 2023. The plan includes a renovated streetscape for Main Street and the side streets in between Main Street and Windsor Street for the length of the downtown. Staff is currently working on grant applications for Community Development Block Grant (CDBG) funds and Appalachian Regional Commission (ARC) funds to pay for the construction of the anticipated Phase I which this proposal contemplates. The grant applications will be made using staff estimates from recent projects of similar ilk. To be prepared to execute the construction of the streetscape renovations after funding is secured, the streetscape must be designed and engineered. The attached proposal fees from SW+ are: Division 1: Schematic Design (30% Design) $19,500 Division 2: Design Development (60% Design) $23,000 Division 3: Construction Documents $49,000 Division 4A: Permitting Coordination $17,500 Division 4B: Railroad Permitting Coordination $ 7,500 Division 5: Bidding and Negotiation $ 6,000 Division 6: Construction Phase Services Hourly Division 7: Coordination Meetings/Conference Call Hourly One other professional design and engineering service firm was asked to prepare a price proposal, it did not submit one. Staff recommends approval of the SW+ proposal using General Fund fund balance. 13. Mobile stage for Cross Hill Fellowship Executive Session 1. Executive Session for the purpose of discussion of negotiations incident to proposed contractual arrangements and proposed sale or purchase of property, the receipt of legal advice where the legal advice relates to a pending, threatened, or potential claim or other matters covered by the attorney-client privilege, settlement of legal claims, or the position of the public agency in other adversary situations involving the assertion against the agency of a claim pursuant to S.C. Code Ann. 34-4-70 (2). (1) Contractual agreements between the City of Westminster and Oconee County regarding Fire Service Adjourn 6 1 June 13, 2023 MINUTES WESTMINSTER CITY COUNCIL Regular Scheduled Meeting Tuesday, June 13, 2023 The City Council of the City of Westminster met in a regular scheduled meeting on Tuesday, June 13, 2023, at 6:00 pm at the Westminster Fire Department with Mayor Brian Ramey presiding. Those in attendance were: Brian Ramey Dale Glymph Daby Snipes Ruth May Jimmy Powell Audrey Reese Adam Dunn City Administrator, Kevin Bronson Assistant to the City Administrator, Reagan Osbon City Clerk, Rebecca Overton Police Chief, Matt Patterson Fire Chief, Michael Smith Utility Director, Kevin Harbin City Attorney, Andrew Holliday Members of the public and press Notice of the meeting and the agenda was posted on a window at the Fire Department and at westminstersc.org twenty-four hours prior to the meeting and all persons, organizations and local media requesting notification and the agenda were notified by email. Call to Order Mayor Ramey called the meeting to order at 6:00 pm. Invocation and Pledge of Allegiance Mrs. Audrey Reese led the Council in the invocation and the Pledge of Allegiance. Certification of Quorum Rebecca Overton certified a quorum. Public Comments There were no public comments. Public Hearing for FY2023-2024 Budget 7 2 June 13, 2023 Upon a motion by Mayor Ramey and seconded by Mrs. Reese, the motion to open the public hearing for the FY 2023-2024 Budget passed unanimously. There were no comments from the public. Upon a motion by Mayor Ramey and seconded by Mrs. Reese, the motion to close the public hearing for the FY 2023-2024 Budget passed unanimously. Comments from the Mayor and Council Mrs. Reese thanked everyone who had parts in the recent events around town. Mrs. Snipes thanked Kevin Bronson and Staff on their recent work on the completion of the budget process. Mayor Ramey suggested that fellow members of Council be speaking to local officials about trying to keep the potential new middle school in the City limits. He also announced that he would be seeking another term for Mayor in the upcoming election. Presentation by Libby Imbody with Authenti City - City Marketing and Branding Libby Imbody introduced new logos and taglines to Council and stated that she had been working since January on new ideas to help sell the city and also help implement some ideas from the recent Downtown Master Plan. All of Council agreed with the logos and plans presented. Routine Business 1. Approval of the May 9, 2023, Regular City Council Meeting Minutes Upon a motion by Mayor Ramey and seconded by Mrs. Reese, the motion to approve the May 9, 2023, Regular Meeting Minutes passed unanimously. 2. Approval of the May 18, 2023, Called Meeting Minutes Upon a motion by Mr s. Reese and seconded by M s. May, the motion to approve the May 18, 2023, Called Meeting Minutes passed unanimously. Member Motion Vote Ramey Motion Yes Glymph Yes Powell Yes Reese Second Yes May Yes Dunn Yes Snipes Yes 8 3 June 13, 2023 3. Comments from the Utility Director a. Mr. Harbin informed Council that a tree had fallen on lines and across the road on N Isundega Street which caused about 12 outages for a few hours until crews made repairs. b. Mr. Harbin informed Council that crews had been working on replacing a water line on Frank Street and that sewer crews were still addressing various sewer issues. c. Mr. Harbin informed Council that the next C Funds project is still on hold until the Oak Street survey process is completed. 4. Comments from City Administrator a. Mr. Bronson offered his apologies to Dot’s Kitchen adding that he had stated wrong information concerning the status of their utility account payments. He added that they are self supporting and the City does not cover the utility bill there. b. Mr. Bronson informed Council that the USDA water project contract had been awarded to two Contractors and they were waiting on notices to proceed. c. Mr. Bronson informed Council that the RIA SCIIP sewer project is also waiting on notices to proceed and will likely begin after the first of the year. d. Mr. Bronson informed Council that the Boudrex Group had recently completed a study of City Hall, the Polic Department, and old Magistrate Office buildings to determine the best suit for centralized locations of a Welcome Center and Council Chambers. He added that further discussions will be held for funding ideas. e. Mr. Bronson informed Council that the Seed Farm Road neighborhood developers are interested in the neighborhood being in the city limits and the water and sewer projects for that location will be bid out. f. Mr. Bronson informed Council that he had Staff working on a vacant building Ordinance and was asking for direction from Council. Council agreed for Mr. Member Motion Vote Ramey Yes Glymph Abstain Powell Yes Reese Motion Yes May Second Yes Dunn Yes Snipes Yes 9 4 June 13, 2023 Bronson and Staff to move forward with the development of a vacant building Ordinance. g. Mr. Bronson informed Council that he had recently been asked to review the possibility of a Virtual Council Attendance Ordinance. He added that such an Ordinance would apply to all Boards and would allow members to attend virtually. Mr. Bronson asked Council if they wished to proceed with this. After discussion, the subject was tabled until the fall. Old Business 1. Consideration of Hospitality Tax Grant request from the Oconee History Museum and Consider Appropriation(s) related thereto to be incorporated into Ordinance 2023-06-13- 01. Mr. Bronson informed Council that due to some incorrect information, the Oconee History Museum was taken out of HTAX Grant considerations. He added that their original request was $8,000 and he suggested absorbing $4,000 on their utility account with an account credit, and the other $4,000 to come from the ATAX fund balance. Mr. Bronson added that recent projects completed from the HTAX and ATAX fund balances would warrant later discussion because there would be much less funds available for grant applicants. Upon a motion by Mrs. Reese and seconded by Mrs. Snipes, the motion to approve $8,000.00 to the Oconee History Museum by crediting $4,000.00 to the utility account and a $4,000.00 ATAX Funds Grant passed unanimously. 2. Consideration of Second Reading of Ordinance No. 2023-06-13-01, Budget Ordinance; An Ordinance Making Appropriations for Certain Expenses, Capital Improvements and Indebtedness of The City of Westminster, South Carolina for the Year Beginning July 1, 2023, and ending June 30, 2024. Appropriation Amount General $2,914,572 Utility $8,301,415 Member Motion Vote Ramey Yes Glymph Yes Powell Yes Reese Motion Yes May Yes Dunn Yes Snipes Second Yes 10 5 June 13, 2023 Solid Waste $915,046 ATAX $8,300 HTAX $484,314 Fire Department 1% $13,609 Local Development Corp $47,031 Youth Recreation Fund $579,319 Capital Projects Fund $14,530,684 County ARP $682,324 Grand Total $28,476,614 Less Interfund Transfers $1,405,869 Net Appropriations $27,070,745 Mr. Bronson informed Council that this ordinance sets the fiscal year 2023-2034 (FY2024) annual budget. He added that this is the same budget that was proposed at the April 25, 2023, City Council Budget Workshop and that notice of the Public Hearing ran in the Seneca Journal on May 26, 2023. Upon a motion by Mr. Dunn and seconded by Mrs. Snipes the motion to approve the Second Reading of Ordinance No. 2023-06-13-01, as amended to include a $4,000 ATAX Fund Grant to Oconee History Museum passed unanimously. 3. Consideration of Second Reading of Ordinance #2023-06-13-02; An Ordinance to Execute Real Property Sale and Purchase Agreement (“Agreement”) by and between the City of Westminster, South Carolina (“Seller”), a body politic and corporate and a political subdivision of the State of South Carolina, and Westminster Hope ComeUnity (“Buyer”), a South Carolina non-profit Corporation. For the parcel (Tax Map #530-21- 06-015) of approximately 1.34 acres located at 115 Riley Street to Westminster Hope ComeUnity for $10,000 contingent upon rezoning from R15 to GR. Member Motion Vote Ramey Yes Glymph Yes Powell Yes Reese Yes May Yes Dunn Motion Yes Snipes Second Yes 11 6 June 13, 2023 At this time, Mrs. Reese stepped out of the room and recused herself from any discussion and vote. Mr. Bronson reminded Council that this second reading would allow the Westminster Hope to purchase the City owned property located at 115 Riley Street. Upon a motion by Mr. Dunn and seconded by Mrs. Snipes, the motion to approve Second Reading of Ordinance #2023-06-13-02; An Ordinance to Execute Real Property Sale and Purchase Agreement (“Agreement”) by and between the City of Westminster, South Carolina (“Seller”), a body politic and corporate and a political subdivision of the State of South Carolina, and Westminster Hope ComeUnity (“Buyer”), a South Carolina non-profit Corporation. For the parcel (Tax Map #530-21-06-015) of approximately 1.34 acres located at 115 Riley Street to Westminster Hope ComeUnity for $10,000 contingent upon rezoning from R15 to GR passed unanimously. New Business 1. Consideration of First Reading of Ordinance #2023-08-08-01 City of Westminster; An Ordinance Amending Section 50.01 of the City of Westminster Code of Ordinances Regarding the Annexation of Properties Located Outside of the City as a Condition to for the City to Provide Certain Utility Services, and Other Matters Related Thereto. Mr. Bronson reminded Council that in May of 2021, Council passed Ordinance No. 2021-05-11-01 stipulating the use of annexation covenants when approving electric, water or sewer service(s) of properties located out the City. He added that staff was presenting consideration of changes at the suggestion of legal counsel for two reasons: A. Electric service is removed from the language. This will simplify future considerations of potential operations and/or Member Motion Vote Ramey Yes Glymph Yes Powell Yes Reese Recusal May Yes Dunn Motion Yes Snipes Second Yes 12 7 June 13, 2023 maintenance agreements with a third party (i.e. removal of electric service simplifies future contractual agreements). B. Insertion of language to clarify the intent and practice of collecting annexation covenants for “New Services.” Mr. Bronson clarified that the three documents offered for this item are: the first is the Ordinance which amends the City Code (edits are noted to the right side of the page); the second is a revised Declaration of Annexation Covenants which is used when a service agreement is accepted; and the third is an edited version of Section 50.01 of the City’s Code (edits are noted on the right side of the page). Upon a motion by Mrs. Snipes and seconded by Mrs. Reece, the motion to approve First Reading of Ordinance #2023-08-08-01 City of Westminster; An Ordinance Amending Section 50.01 of the City of Westminster Code of Ordinances Regarding the Annexation of Properties Located Outside of the City as a Condition to for the City to Provide Certain Utility Services, and Other Matters Related Thereto passed unanimously. 2. Presentation of Schedule for the Planning Commission and City Council considerations of edits and adoption of: a. Zoning Ordinance b. Bylaws for Planning Commission and Board of Zoning Appeals c. Future Land Use Map amendments d. Land Development Regulations Mr. Reagan Osbon provided an update to the Council on the recent efforts by the Planning Commission to update the Zoning Ordinance and the Future Land Use Map. He added that he will working more with the Planning Commission to wrap up the efforts of these updates. Mr. Osbon added that the schedule he will try to follow will be: • July: Introductions, discuss schedule of monthly meeting over the next several months, establish definitions of new terms, and the processes of the Planning Commission and BZA. Member Motion Vote Ramey Yes Glymph Yes Powell Yes Reese Second Yes May Yes Dunn Yes Snipes Motion Yes 13 8 June 13, 2023 • August: Discuss why this is important, how the city can use these tools, and overview of the Planning Commission bylaws. • September: Discuss Zoning Ordinance and review the possible zoning designations. • October: Discuss Section 1 of the Future Land Use Map. • November: Discuss Section 2 of the Future Land Use Map. • December: Discuss Section 3 of the Future Land Use Map. • January: Discuss Section 4 of the Future Land Use Map. 3. Consideration to Cancel July 11, 2023, City Council Meeting Upon a motion by Mrs. Reese and seconded by Mr. Dunn, the motion to cancel the July 11, 2023, City Council Meeting passed unanimously. 4. Consideration of bid award for 2023 Kawasaki Mule side by side for Westminster Fire Department. To be funded by SC LLR VSAFE grant for $12,300 plus sale of surplus Fire Department equipment. Bids to be provided at City Council Meeting. Mr. Bronson provided Council with the following three quotes for a Kawasaki Mule: Mega Motorsports for $17,961.02, Foothills Motorsports for $16,853.93, and Performance Powersports for $16,853.00. He added that the funding for the equipment was coming from a State Grant and sale of surplus equipment. Upon a motion by Mr. Dunn and seconded by Mrs. Reese, the motion to approve the purchase of a Kawasaki Mule from Performance Powersports in the amount of $16,853.00 passed unanimously. Member Motion Vote Ramey Yes Glymph Yes Powell Yes Reese Motion Yes May Yes Dunn Second Yes Snipes Yes Member Motion Vote Ramey Yes Glymph Yes Powell Yes Reese Second Yes May Yes Dunn Motion Yes Snipes Yes 14 9 June 13, 2023 Executive Session Upon a motion by Mrs. Snipes and seconded by Mr. Glymph, the motion to enter executive session passed unanimously. Upon a motion by Mrs. Snipes and seconded by Mr. Glymph, the motion to exit executive session passed unanimously. Adjourn Upon a motion by Mrs. Reese and seconded by Mrs. Snipes, the motion to adjourn the meeting at 8:45 pm passed unanimously. (Minutes submitted by Rebecca Overton) __________________________________ _____________________ Mayor Brian Ramey Date 15 1 STATE OF SOUTH CAROLINA ) ) COUNTY OF OCONEE ) ORDINANCE #202 3-08-08-01 ) CITY OF WESTMINSTER ) AN ORDINANCE AMENDING SECTION 50.01 OF THE CITY OF WESTMINSTER CODE OF ORDINANCES REGARDING THE ANNEXATION OF PROPERTIES LOCATED OUTSIDE OF THE CITY AS A CONDITION TO FOR THE CITY TO PROVIDE CERTAIN UTILITY SERVICES, AND OTHER MATTERS RELATED THERETO. NOW THEREFORE, BE IT ORDAINED by the City Council of the City of Westminster (the “City Council”), the governing body of the City of Westminster, South Carolina (the “City”), as follows: Section 1 Findings. The City Council hereby makes the following findings of fact in connection with the enactment of this ordinance (this “Ordinance”): (a) T he City is authorized by the general powers given to municipalities and Section 5-7-60 of the Code of Laws of South Carolina 1976, as amended, to provide water , sewer and electric service (“Utility Service ”) to individuals and properties located outside of the corporate boundaries of the City by contract. (b) Pursuant to Ordinance No. 2021-05-11- 01, enacted on May 11, 2021, the City Council amended Section 50.01 of the City’s Code of Ordinances to include subsection (E) (the “Annexation Requirement”), pursuant to which the City Council made it the policy of the City to require annexation as a condition of allowing new or upgraded connections to the City’s water, sewer, and electric utility system. (c) The City Council wishes to amend the Annexation Requirement to clarify the circumstances under which the City will require annexation, and to eliminate the City’s electric system from those utility services for which annexation is required as a condition of service. (d) In order to accomplish these purposes, the Council now desires, through the enactment of this Ordinance, to revise the Annexation Requirement as set forth herein. Section 2 Amendments to Annexation Requirements. By and through the enactment of this Ordinance, Chapter 50, Section 50.01(E) of the City’s Code of Ordinances shall be amended to read, in its entirety, as follows: Sec. 50.01 - FURNISHING ELECTRICITY, WATER AND SEWER SERVICE. (E) It shall be the policy of the City to require that the owner of any property located outside of the City’s corporate boundaries (a “Subject Property”) that requests 16 2 New Service (as defined herein) from the City’s water or sewer (the “Utility System”) be required to annex the Subject Property into the City at such time as the Subject Property is contiguous to the corporate boundaries of the City. (1) If the Subject Property is contiguous to the City at the time such request is made, the owner thereof shall be required to submit an annexation petition to the City prior to the connection to the Utility System being made. (2) If the Subject Property is not contiguous to the corporate boundaries of the City at the time such request is made, the owner of the Subject Property shall be required to execute a covenant to annex the Subject Property into the City (an “Annexation Covenant”) prior to any connection to the Utility System being made, requiring the owner of the Subject Property, or any subsequent owner, to take such action necessary to annex the Subject Property, any portion thereof, or any larger property to which the Subject Property was added, into the City at such time as the Subject Property, any portion thereof, or any larger property to which the Subject Property was added becomes contiguous to the corporate boundaries of the City. The Annexation Covenant shall be in a form to be approved by the Council. (3) The Council may waive this requirement with respect to any property through the adoption of a resolution that includes specific findings in connection with the justifications of such waiver and a finding that such waiver is in the best interest of the City and its citizens. (4) “New Service” for the purposes of this subsection (E), means (i) a request to make a new physical connection for a Subject Property to either component of the Utility System; (ii) a request to reestablish service from any component of the Utility System for a Subject Property that has previously established a physical connection to such component of the Utility System; or (iii) a request to transfer existing service for any component of the Utility System for a Subject Property to a different party. Section 3 Severability. If any section, subsection, sentence, clause or phrase of this Ordinance or the Annexation Requirement, as amended hereby, is, for any reason, held or determined to be invalid, such decision shall not affect the validity of the remaining portions of this Ordinance or Annexation Requirement, as applicable. Section 4 Savings Clause. Nothing in this Ordinance hereby enacted shall be construed to affect any suit or proceeding impending in any court, or any rights acquired, or liability incurred, or any cause of causes of action acquired or existing, under any act or ordinance hereby repealed; nor shall any just or legal right or remedy of any character be lost, impaired or affected by this Ordinance. 17 3 Section 5 Repealer; Effective Date. All ordinances or parts of ordinances inconsistent or in conflict with the provisions of this ordinance are hereby repealed to the extent of the conflict or inconsistency. This Ordinance shall take effect immediately upon its enactment by the Council. [REMAINDER OF PAGE INTENTIONALLY LEFT BLANK] 18 4 DONE AND ENACTED IN COUNCIL ASSEMBLED, this 11th day of July 2023. CITY OF WESTMINSTER, SOUTH CAROLINA [SEAL] Brian Ramey, Mayor Attest: Rebecca Overton, City Clerk Reviewed by City Attorney and approved as to form: Andrew Holliday, City Attorney First Reading: June 13, 2023 Second Reading: August 8, 2023 19 STATE OF SOUTH CAROLINA ) ) DECLARATION OF ANNEXATION COUNTY OF OCONEE ) COVENANT ) CITY OF WESTMINSTER ) THIS DECLARATION OF ANNEXATION COVENANT (this “Covenant”) is made this ___ day of __________ 20__ between the City of Westminster, South Carolina (the “City”), and the person or entity described below, including all successors in interest and assigns, having legal title to a present possessory interest in real estate equal to a life estate or greater, or any other designation as set forth in the Section 5-3-240 of the South Carolina Code of Laws 1976, as amended, or as set forth through judicial interpretation in South Carolina case law (the “Owner”): (_) A corporation, i ncorporated under the laws of the State of __________________and organized under the name of ; or (_) A g eneral or limited partnership, limited liability company, or limited liability partnership operating under the name of ; or (_) Individual(s) by the name(s) of _ . RECITALS: WHEREAS, the r eal property located at having Tax Map Number ( as further described herein at Exhibit A , the “ Subject Property ”), belonging to the Owner, is located outside the City’s corporate limits but is located in an area in which annexation into the City is or may become appropriate. The City is under no obligation to furnish Utility Services (as defined herein) to properties located outside of the City’s corporate limits, but may do so by contract with individual property owners. W HEREAS, the Owner wishes to obtain Utility Services from the City by contract without the necessity of waiting until the Subject Property may be annexed into the City, and the Owner has entered into an agreement (the “Customer Agreement”) with the City in order to secure one or more of the Utility Services for the Subject Property. In consideration for the City’s provision of Utility Services to the Subject Property and the connection of the Subject Property to the City’s combined utility system (the “System”), the Owner agrees, pursuant to the provisions of this Covenant, to take such action as is necessary to request annexation into the City at such time as the Subject Property becomes contiguous to the City’s corporate limits. This Covenant shall be binding upon any and all assigns or successors in interest to the Owner’s ownership interest in the Subject Property. WHEREAS, Owner understands that the obligation to execute any and every annexation petition relating to the Subject Property, when presented, is a requirement for Utility Services outside the City, and that failure to satisfy this obligation may, at the election of the City, cause discontinuance and termination of Utility Services to the Subject Property. The Owner further understands that the obligations created under this Covenant run with the land and will apply equally to subsequent owners of the Subject Property. In order to ensure the ability of the City to enforce the provisions of this Covenant against the Owner or any subsequent owner of the Subject Property, the Owner agrees that the provisions of this Covenant shall serve as restrictive covenants against the Subject Property in favor of, and for the benefit of, the City. 20 2 NOW THEREFORE, in consideration of the provision of Utility Services by the City, the Owner hereby covenants as follows: 1. R ecitals Incorporated. The above recitals are hereby incorporated in and made a part of this Covenant as fully as if set forth verbatim herein. These recitals are true and correct and the Owner is bound thereby. By signing this Covenant, the Owner acknowledges reading, understanding, and agreeing to each of the recitals. By and through the recording of this Covenant, all assigns and successors in interest in the Subject Property are determined to have read, understood, and agreed to each of the recitals. 2. U tility Services. A. As used in t his Covenant, “Utility Services” means and refers to any water, or sewer or electric services, or any combination thereof, provided by the City pursuant to the terms of the Customer Agreement, including but not limited to, (i) ongoing water, or sewer and electric service; (ii) a service tap from existing water or sewer lines, (iii) a service connection from an existing electric line, (iii) an extension of water or sewer mains or electric lines , or (iv) the issuance of a letter of willingness and capability to provide Utility Services. B. Pursuant to the provisions of the Customer Agreement, the City has agreed to furnish Utility Services to the Subject Property upon the terms, conditions and covenants set forth therein, in addition to any other rat es, classifications, policies, procedures, and terms of service applicable to Utility Services that the City has adopted or may in the future adopt and any subsequent amendments thereto. The Owner acknowledges that in no event shall the City be obligated t o provide or continue to provide Utility Services to the Subject Property, or any portion thereof, if any obligation of the Owner contained in this Covenant is breached or any covenant made by the Owner in this Covenant is false. Any actions or statements made by the City (including the issuance of any letter of willingness and capability) in connection with providing Utility Services to the Subject Property is made subject to the terms of this Covenant, and if this Covenant is breached by the Owner then all such actions or statements may be, in the City’s sole discretion, declared null and void and no reliance by any entity may be placed thereon. 3. C ovenants by Owner . The Owner makes the following covenants, warranties, agreements and representations, each of which shall be deemed material to this Covenant: A. T he Owner covenants and agrees that he will sign any and every annexation petition which relates to the Subject Property (an “Annexation Petition”) immediately upon presentment by the City. As used in this Covenant, an Annexation Petition shall be construed to relate to the Subject Property if the property to be annexed pursuant to and described in the Annexation Petition includes the Subject Property or any portion thereof. The Owner acknowledges that a purpose of this Covenant is to ensure, as a material benefit and consideration to the City, the Owner’s full and complete cooperation with any effort to annex the Subject Property, and the Owner agrees, that upon request by the City, the Owner will do, execute, acknowledge and deliver, all such further acts, agreements, and assurances as may be requested and reasonably necessary for the full completion and consummation of the purpose contemplated herein. These further acts shall specifically include, but are not limited to, signing subsequent or additional successive Annexation Petitions in the event any prior annexation effort is unsuccessful. The Owner warrants and covenants that the Owner has not and will not subdivide the Subject Property, combine the Subject Property with other real property not subject to this Covenant, or otherwise manipulate the Subject Property to hinder or impede the City’s ability to annex the Subject Property, and any attempt to do so will be considered a breach of this Covenant. This Covenant shall not be construed as prohibiting or inhibiting the subdivision of the Subject Property or the combination of the Subject Property with any other property; provided, however, upon any such division of the Subject Property, this Covenant shall apply to any additional properties derived from the Subject 21 3 Property and upon the combination of the Subject Property, or any portion thereof, with any other real property this Covenant shall apply to the entirety of the resulting combined property, which shall thereafter be considered the Subject Property, or a portion thereof. B. The Owner agrees that the obligations contained in this Covenant shall continue in full force and effect until the earlier of the following: (i) the Subject Property, in its entirety, has been successfully annexed into, and continuously lies within, the corporate limits of the City; or (ii) the Owner affirmatively requests in writing that (1) the Subject Property be permanently disconnected from the System, and (2) the Subject Property, in its entirety, is no longer served by the Utility Services. C. The Owner is a person eighteen years of age, or older, or any firm or corporation, who or which is the sole owner of legal title to a present possessory interest in the Subject Property equal to a life estate or greater (expressly excluding leaseholds, easements, equitable interests, inchoate rights, dower rights, and future interests). Further, the Owner covenants and warrants that he will not transfer, alienate, devise, encumber, or otherwise affect title to the Subject Property for a period of seven days from the date of this Covenant, in order to allow the City time to have this Covenant recorded in the Office of the Register of Deeds for Oconee County, South Carolina. The Owner will inform any subsequent Owner of (i) the Subject Property, (ii) any portion of the Subject Property, or (iii) any real property that the Subject Property is made a part of, that the obligations contained in this Covenant continue and run with the land. A failure by the Owner to properly inform any successor in interest of the Subject Property of this Covenant shall not affect the validity or applicability of this Agreement with respect to any successor in interest, and any such successor in interest shall remain bound by the provisions hereof. D. T he Owner agrees that any breach of conditions of the Customer Agreement or any other agreements associated with the provision of Utility Services made in accordance with this Covenant, shall be a breach of this Covenant. Such conditions may include, but are not limited to, the following: (i) payment of applicable connection fees and surcharges as fixed by the City; (ii) general terms, conditions, and policies upon which Utility Service is made available by the City; and (iii) the payment to the City when due such water, or sewer or electric charges, taxes, or fees as may be imposed from time to time. E. The Owner agrees that the effectiveness of this Covenant will continue and survive any temporary disconnection, interruption, or termination of Utility Services by the City, except for a permanent termination of Utility Services pursuant to Section 3(B)(ii) above. 4. R estrictive Covenant . THE OWNER HEREBY IMPOSES UPON THE SUBJECT PROPERTY FOR THE BENEFIT OF THE CITY A RESTRICTIVE COVENANT REQUIRING THAT FUTURE OWNERS OF THE SUBJECT PROPERTY, OR ANY PART THEREOF, BE BOUND BY THE SAME TERMS, CONDITIONS AND COVENANTS AS ARE SET FORTH IN THIS COVENANT. THIS COVENANT SHALL CONTINUE IN FULL FORCE AND EFFECT UNTIL THE EARLIER OF THE FOLLOWING: ( I) THE SUBJECT PROPERTY, IN ITS ENTIRETY, HAS BEEN SUCCESSFULLY ANNEXED INTO AND LIES CONTINUOUSLY WITHIN THE CORPORATE LIMITS OF THE CITY; OR (II) THE SUBJECT PROPERTY, IN ITS ENTIRETY, IS NO LONGER BEING SERVED BY UTILITY SERVICES. ANY AND EVERY FUTURE OWNER OF THE SUBJECT PROPERTY, OR ANY PART THEREOF, IS BOUND BY THE TERMS CONTAINED IN THIS COVENANT BY ACCEPTANCE OF A DEED TO THE SUBJECT PROPERTY, OR PORTION THEREOF, THAT IS SUBJECT TO THIS RESTRICTIVE COVENANT. 5. R ecordation of Covenant . The Owner hereby expressly agrees and directs that this Covenant and description of the Subject Property be recorded in the real estate records in the Office of the Register of Deeds for Oconee County, South Carolina, so as to give record notice to any future prospective purchaser 22 4 of the Subject Property that this Covenant is an obligation upon the land and runs with the land until the occurrence of either of the two events set forth in the preceding paragraphs. 6. D escription of Property. This Covenant and restrictive covenant apply to the Subject Property as it is more fully described on the attached Exhibit A. 7. G rant of Right of Way. The Owner grants the City a right -of-way on and through the Subject Property as reasonably necessary for the City’s operation of the System in order to provide Utility Services to the Subject Property. In the event a standard grant of right-of-way has not been executed by the Owner before execution of this Covenant, the Owner agrees, upon request, to execute a standard right-of-way to further document and describe the specific location and rights associated therewith. 8. G rant of Power of Attorney. In the event the Owner fails to meet the obligations imposed herein and does not sign any Annexation Petition upon request, the Owner hereby irrevocably appoints the City Administrator of the City of Westminster, South Carolina, Attorney in Fact for the Owner of the Subject Property with full power to sign any Annexation Petition upon the request of the City. 9. O wner’s Use of Subject Property . If the Owner changes the current use of the Subject Property to any different use, the City may, at its option, require additional approvals and conditions for continued Utility Service thereon. 10. D efault; Remedies . As used in this Covenant, a default of this Covenant occurs immediately upon any breach, failure or nonoccurrence of any term, condition, obligation, affirmative act, covenant, representation or warranty. Immediately upon any default by the Owner, the City may, in its sole discretion, void this Covenant and thereby void any statements, actions or commitments by the City as to providing Utility Services to the Subject Property. Additionally, upon any default by the Owner, the City may elect to enforce this Covenant. If any effort to enforce the terms of this Covenant fails for any reason, the City may thereafter elect to rescind and void this Covenant. In the event this Covenant is rescinded or voided, the City shall be under no obligation to provide Utility Services or to continue to provide Utility Services to the Subject Property or any portion thereof. In the event of any default by the Owner of this Covenant, the City shall be entitled to recover from the Owner the costs and attorneys’ fees incurred by the City as a result of or in response to the Owner’s default. 11. N o Waiver . The failure of any person or entity having any right, title or interest in the Subject Property, or any portion thereof, including the Owner and his respective heirs, successors, successors in title and assigns or the City, to bring an action to enforce this Covenant, shall not operate as a waiver of the right to do so for any later subsequent violations or the right to enforce any other part of this Covenant at any future time. The failure of any person or entity having any right, title or interest in the Subject Property, or any portion thereof, including the Owner and his respective heirs, successors, successors in title and assigns or the City to exercise or to delay in exercising any right or remedy available hereunder or at law or in equity shall not operate as a waiver. Notice of default or violation shall not be deemed as a condition precedent to the exercise of any right or remedy available hereunder or at law or in equity. Should any person or entity having any right, title or interest in the Subject Property, or any portion thereof, including the Owner and their respective heirs, successors, successors in title and assigns or the City fail to bring an action for enforcement of this Covenant or seek any other remedy allowed at law or in equity such shall not create any liability for the recovery of damages for the failure to so act. 12. R emedies Cumulative. Every right and remedy provided in this Covenant is distinct from and cumulative to every other right or remedy under this Covenant or available at law or in equity. The provision of certain rights and remedies in this Covenant does not abrogate, limit or affect any rights or remedies as 23 5 provided at law or in equity. Every right and remedy may be exercised concurrently, independently or successively. 13. E xhibits Incorporated by Reference. All exhibits referenced in this Covenant are incorporated herein as integral parts of this C ovenant and shall be considered reiterated herein as fully as if such provisions had been set forth verbatim in this Covenant. 14. Co pies . A photostatic or other reproduction of this document shall be as effective, valid and conclusive as the original. 15. M odification . The terms of this Covenant may be modified in whole or in part only by a written instrument signed by the Owner and consented to by the City. Any oral agreement to modify this Covenant shall be void and of no force and effect. 16. C aptions . The captions and headings of the Paragraphs of this Covenant are for convenience only and may not be used to interpret or define the provisions of this Covenant. 17. S everability . In the event that any provision or clause of this Covenant conflicts with any applicable law, the other provisions of this Covenant shall be given effect as fully as possible without the conflicting provision, and to this end the provisions of this Covenant are declared to be severable. 18. R eferences Herein. Wherever appropriate, all words herein in the male gender shall be deemed to include the female or neuter gender, all singular words shall include the plural, and all plural words shall include the singular. 19. S uccessors and Assigns. The covenants and agreements contained in this Covenant and the obligations created hereunder shall ensure to the benefit of and be binding on the City, the Owner and all heirs, successors and assigns of the Owner to the Subject Property, or any part thereof. 20. G overning Law and Forum . The validity, construction and effect of this Covenant shall be governed by the laws of the State of South Carolina, and the Owner hereby consents to the exclusive jurisdiction of the courts of the State of South Carolina for resolution of any dispute arising hereunder. 21. S ealed Instrument. Owner agrees that by signing below he intends to place his hands and seals upon this Covenant and that this Covenant shall be considered in every respect to be a sealed instrument. 22. E ffective Date . This Covenant shall be effective upon the date of the last party affixing his signature. [ Remainder of Page Left Blank] 24 6 IN WITNESS WHEREOF, the Owner duly executes this Declaration of Restrictive Covenant as of the date first written above. WITNESS #1 OWNER OF SUBJECT PROPERTY Print Name: Print Name: WITNESS #2 (Notary Public) Print Name: STATE OF SOUTH CAROLINA ) ) COUNTY OF OCONEE ) PROBATE Personally appeared before me the undersigned witness and made oath that (s)he saw the within named property owner, sign, seal and as his act and deed, deliver the within Declaration of Annexation Covenant and that (s)he with the other witness named above witness the execution thereof. SWORN BEFORE ME this day of , 20__ Notary Public for South Carolina Print Name: My Commission Expires: _____________________________________________________________________________________ The City hereby accepts the Declaration of Annexation Covenant set forth herein. CITY OF WESTMINSTER, SOUTH CAROLINA City Administrator 25 Exhibit A Legal Description of Property/Copy of Deed 26 City of Westminster Annexation Requirement Revisions Sec. 50.01 - FURNISHING ELECTRICITY, WATER AND SEWER SERVICE. (E) It shall be the policy of the City to require that the owner of any property located outside of the City’s corporate boundaries (a “Subject Property”) that requests a new or upgraded connection to any component ofNew Service (as defined herein) from the City’s water, or sewer and electric utility system (the “Utility System”) be required to annex the Subject Property into the City at such time as the Subject Property is contiguous to the corporate boundaries of the City. (1) If the Subject Property is contiguous to the City at the time such request is made, the owner thereof shall be required to submit an annexation petition to the City prior to the connection to the Utility System being made. (2) If the Subject Property is not contiguous to the corporate boundaries of the City at the time such request is made , the owner of the Subject Property shall be required to execute a covenant to annex the Subject Property into the City (an “Annexation Covenant”) prior to any connection to the Utility System being made, requiring the owner of the Subject Property, or any subsequent owner, to take such action necessary to annex the Subject Property, any portion thereof, or any larger property to which the Subject Property was added, into the City at such time as the Subject Property, any portion thereof, or any larger property to which the Subject Property was added becomes contiguous to the corporate boundaries of the City. The Annexation Covenant shall be in a form to be approved by the Council. (3) The Council may waive this requirement with respect to any property through the adoption of a resolution that includes specific findings in connection with the justifications of such waiver and a finding that such waiver is in the best interest of the City and its citizens. (4) “New Service” for the purposes of this subsection (E), means (i) a request to make a new physical connection for a Subject Property to either component of the Utility System; (ii) a request to reestablish service from any component of the Utility System for a Subject Property that has previously established a physical connection to such component of the Utility System; or (iii) a request to transfer existing service for any component of the Utility System for a Subject Property to a different party. 27 City of Westminster| PO Box 399 | Westminster, SC 29693 | 864.647.3200 |www.westminstersc.org To: Members of City Council From: Reagan Osbon, Assistant City Administrator Date: 07/20/2023 Westminster Planning Commission July 17, 2023, Meeting Report The Westminster Planning Commission met on Monday, July 17, 2023, to consider two items for recommendation for City Council: 1. Consideration of Zoning Amendment Application 2023-001 by Jonathan Terry for 104 Highlands Ave from R-25 to MFR. The applicant presented site plans and the Amendment Application to the commission and stated that he planned to develop duplexes and small, high density single-family units on the 11.5 Acre property. Applicant intends to sell the homes for about $220,000-$230,000 after development. The Commission asked questions about greenspace, density of units, and continuity of adjacent properties. Applicant said that he intended to incorporate greenspace into the final design plan, likely around the currently abandoned home on the property at the end of Dickson St. Applicant and commission agreed that current zoning regulations, even for MFR, would not allow an overly dense development. The MFR designation would match the zoning of two adjacent HUD supported housing complexes. The Commission recommended approval of the Application, by a vote of 5-0 (unanimous). 2. Consideration of Zoning Amendment Application 2023-002 by the City of Westminster for 115 Riley Ave from R-15 to MFR. The City, applicant and owner, has agreed to convey the property to Westminster Hope ComeUnity, a local nonprofit group, contingent upon rezoning to MFR. Westminster Hope ComeUnity seeks to use the vacant lot, formerly the City Recycling Center, to build three small single-family homes for individuals and families who are without a home for several months while they prepare for and find a permanent residence. The proposed structures would not serve as a “homeless shelter” and beneficiaries will have to complete an application, a drug screening, and have no record of violent crimes (including being a sex offender or convicted of other serious crimes. The Commission did not recommend approval of the application to council, and members cited concerns about location (proximity of a vulnerable population to the HUD supported housing) and ability of the organization to properly manage the project (citing inexperience, not intention as a basis). 28 City of Westminster| PO Box 399 | Westminster, SC 29693 | 864.647.3200 |www.westminstersc.org The Commission did not recommend approval of the Application by a vote of 2-2 (1 abstention). Additionally, staff updated Commissioners on the status of the Commission Bylaws, Zoning Ordinance, and Land Development Regulations and presented a rough outline of topics for the remainder of the Calendar year. A resolution setting dates of the Commission will be presented at the next meeting. 29 30 STATE OF SOUTH CAROLINA ) COUNTY OF OCONEE ) ORDINANCE #2023-09-12-01 CITY OF WESTMINSTER ) AN ORDINANCE TO REZONE A CERTAIN PARCEL IN THE CITY OF WESTMINSTER FROM R-25 (ONE-FAMILY RESIDENTIAL) TO MFR (MULTI-FAMILY RESIDENTIAL). WHEREAS certain property in the City of Westminster on Highlands Avenue and further identified by Oconee County Tax # 530-21-00-003 is currently owned by Mr. Jonathan Terry of Westminster, and WHEREAS, Mr. Jonathan Terry has applied as agent to have this lot rezoned from R-25 One-Family Residential to MFR Multi-Family Residential in order that he be given the flexibility to subdivide the property and build additional homes on the site, and WHEREAS, the property is currently zoned as R-25, zoning classification that requires a larger lot sizes and Mr. Terry is requesting a smaller lot size in order to construct and subdivide additional homes and dwelling units, and WHEREAS, the property surrounding the site is occupied and zoned residential, and WHEREAS, the Planning Commission met in order to conduct a public hearing and to consider the rezoning request, and WHEREAS, the Planning Commission evaluated the rezoning request in accordance with the guidelines of City Code found that the rezoning request did comply with the Comprehensive Plan for the City of Westminster, and WHEREAS, the Planning Commission voted to recommend to the City Council that the property be rezoned from R-25 to MFR, and WHEREAS, the City Council met in order to consider the recommendation from the Planning Commission and has concurred with the recommendation. NOW THEREFORE BE IT ORDAINED by the governing body of the City of Westminster in Council duly assembled and by the authority of the same: That the boundaries of the zoning districts as indicated on the Official Zoning Map of the City which is part of the Westminster Zoning Code, be amended to reflect that the parcel identified as Oconee Tax Map #530-21- 00-003 be rezoned from R-25 Single-Family Residential to MFR Multi- Family Residential. 31 APPROVED, this 12th day of September 2023 Brian Ramey, Mayor First Reading: August 8th, 2023 Rebecca Overton, City Clerk Second Reading: September 12, 2023 Reviewed by City Attorney and approved as to form: ______________________________ Andrew Holliday, City Attorney 32 6 33 7 34 Oconee County, SC Parcel ID 530-21-08-003 Neighborhood 9500200 - Westminster T own Property Address 104 HIGHLAND AVE Legal Description LOT ON HIGHLAND AVE (12.00AC) (Note: Not to be used on legal documents.) Acres 11.5 Class 101 Residential 1 Family T ax District WESTMINSTER INC (District 40) Exemptions Agricultural Use View Map SEVEN J S PROPERTIES LLC 614 W SPRINGWOOD DR SENECA, SC 29672 Land Use Acres Square Footage Frontage Depth F - Farm Market 10.5 500,940 0 0 O - Other 1 43,560 0 0 Style 1 Family (Detached) Heated Square Feet 3043 Interior Walls Finished Exterior Walls Comp Bd/Asbestos Foundation Crawlspace Attic Square Feet 0  Basement Square Feet 0  Year Built 1942 Roof Type Asphalt Shingles Heating Type Central Heat Number Of Bedrooms 0 Number Of Full Bathrooms 1 Number Of Half Bathrooms 0 Value $25,480 Condition Average Fireplaces\Appliances x2s Outside Masonry Chimney 3 Description Year Built Dimensions/Units Identical Units Equipment Shed:Steel\no Slab 1961 12x20 / 0 0 Equipment Shed:Steel\no Slab 1961 21x29 / 0 0 Assessed Year 2022 Land Value $46,000 Improvement Value $25,480 Accessory Value $2,530 T otal Value (Market) $74,010 Land Value $0 Improvement Value $0 Accessory Value $2,530 T otal Value (Capped) $2,530 Parcel Information Owner Land Residential Improvement Information Accessory Information Valuation 8 35 200ft200ft200ft200ft200ft  Find a Parcel or Address -83.094 34.658 Degrees + – All rights reserved Parcel Viewer < HELP > 9 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 115 RILEY STREET WESTMINSTER, SC 29693 51 STATE OF SOUTH CAROLINA ) COUNTY OF OCONEE ) ORDINANCE #2023-09-12-02 CITY OF WESTMINSTER ) AN ORDINANCE TO REZONE A CERTAIN PARCEL IN THE CITY OF WESTMINSTER FROM R-15 (ONE-FAMILY RESIDENTIAL) TO MFR (MULTI-FAMILY RESIDENTIAL). WHEREAS certain property in the City of Westminster on Highland Avenue and further identified by Oconee County Tax # 530-21-06-015 is currently owned by the City of Westminster (“The City”), and WHEREAS, The City has applied as agent to have this lot rezoned from R-15 One-Family Residential to MFR Multi-Family Residential in order that he be given the flexibility to subdivide the property and build additional homes on the site, and WHEREAS, the property is currently zoned as R-15, zoning classification that requires a larger lot sizes and The City is requesting a smaller lot size to construct and subdivide additional homes and dwelling units, with the intent of transferring the property to Westminster Hope ComeUnity, contingent upon rezoning, and WHEREAS, the property surrounding the site is occupied and zoned residential, and WHEREAS, the Planning Commission met in order to conduct a public hearing and to consider the rezoning request, and WHEREAS, Planning Commission Staff evaluated the rezoning request in accordance with the guidelines of City Code found that the rezoning request did comply with the Comprehensive Plan for the City of Westminster, and WHEREAS, the Planning Commission did not vote to recommend to the City Council that the property be rezoned from R-15 to MFR, and WHEREAS, the City Council met in order to consider the recommendation from the Planning Commission and supersedes the recommendation by voting to approve the rezoning. NOW THEREFORE BE IT ORDAINED by the governing body of the City of Westminster in Council duly assembled and by the authority of the same: That the boundaries of the zoning districts as indicated on the Official Zoning Map of the City which is part of the Westminster Zoning Code, be amended to reflect that the parcel identified as Oconee Tax Map #530-21- 06-015 be rezoned from R-15 Single-Family Residential to MFR Multi- 52 Family Residential. APPROVED, this 12th day of September 2023 Brian Ramey, Mayor First Reading: August 8th, 2023 Rebecca Overton, City Clerk Second Re ading: September 12, 2023 Rev iewed by City Attorney and approved as to form: ______ ________________________ Andrew Holliday, City Attorney 53 10 54 11 55 12 56 13 57 14 58 100ft100ft100ft100ft100ft  Find a Parcel or Address -83.091 34.659 Degrees + – All rights reserved Parcel Viewer < HELP > 15 59 51177551 v2 ORDINANCE NO. __________ AUTHORIZING AN EQUIPMENT LEASE PURCHASE AGREEMENT IN THE AMOUNT OF NOT EXCEEDING $540,000 BETWEEN THE CITY OF WESTMINSTER, SOUTH CAROLINA, AND FIRST- CITIZENS BANK & TRUST COMPANY, TO DEFRAY THE COST OF ACQUIRING CERTAIN EQUIPMENT; AND OTHER MATTERS RELATING THERETO. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF WESTMINSTER, SOUTH CAROLINA, AS FOLLOWS: SECTION 1. Findings and Determinations. The City Council (the “Council”) of the City of Westminster, South Carolina (the “City”), hereby finds and determines: (a) The City is an incorporated municipality located in Oconee County, South Carolina, and as such possesses all powers granted to municipalities by the Constitution and the laws of the State of South Carolina (the “State”). (b) Section 5-7-40 of the Code of Laws of South Carolina, 1976, as amended (the “S.C. Code”), empowers all municipalities to own and possess real and personal property and such municipalities may lease any such property. (c) The City desires to enter into a lease-purchase agreement (the “Lease Agreement”) with First- Citizens Bank & Trust Company (the “Lessor”), in the amount of not exceeding $540,000 for the purpose of financing the acquisition of the equipment set forth on Exhibit A hereto (the “Equipment”). (d) The Lease Agreement will not constitute a “financing agreement” and the Equipment will not constitute an “asset” as such terms are defined in Section 11-27-110 of the S.C. Code. Thus, the amount of the Lease Agreement will not be included when calculating the City’s constitutional debt limit under Article X, Section 14 of the Constitution of the State. (e) The Lease Agreement will be subject to annual appropriation by the Council. (f) It is in the best interest of the City to acquire the Equipment by entering into the Lease Agreement with the Lessor. The Lease Agreement will enable the City to purchase the Equipment which will provide services necessary or useful to the operations of the City government. SECTION 2. Proposal of Lessor. Attached as Exhibit B is a proposal from Lessor to provide financing for the Lease Agreement. The City Administrator of the City is hereby authorized to accept such proposal on behalf of the City. SECTION 3. Approval of Lease-Purchase Financing. The Council of the City does hereby approve leasing of the Equipment by the City from the Lessor pursuant to the Lease Agreement. The City Administrator is authorized to determine the quantity, type and cost of the items of Equipment financed with the Lease Agreement, provided the total amount of the Lease Agreement shall not exceed $540,000. 60 51177551 v2 2 SECTION 4. Approval of Lease Agreement. Without further authorization, the City Administrator is hereby authorized to approve the form, terms and provisions of the Lease Agreement, including one or more repayment schedules, proposed by the Lessor. The City Administrator is hereby authorized, empowered and directed to execute, acknowledge and deliver the Lease Agreement in the name and on behalf of the City. The Lease Agreement is to be in the form as shall be approved by the City Administrator, the City Administrator’s execution thereof to constitute conclusive evidence of such approval. SECTION 5. Execution of Documents. The Mayor, Mayor Pro-Tempore, City Administrator and City Clerk are fully empowered and authorized to take such further action and to execute and deliver such additional documents as may be reasonably requested by the Lessor to effect the delivery of the Lease Agreement, including any project fund or acquisition fund agreement, in accordance with the terms and conditions therein set forth, and the transactions contemplated hereby and thereby, and the action of such officers in executing and delivering any of such documents, in such form as the Mayor, Mayor Pro-Tempore, City Administrator and City Clerk shall approve, is hereby fully authorized. SECTION 6. Federal Tax Covenant. The City, as lessee, agrees and covenants that it will not take any action which will, or fail to take any action which failure will, cause interest components of the payments to be made under the Lease Agreement to become includable in the gross income of the Lessor or its successors or assignees for federal income tax purposes pursuant to the provisions of the Internal Revenue Code of 1986, as amended (the “Code”) and regulations promulgated thereunder in effect on the date of original issuance of the Lease Agreement, and that it will comply with all applicable provisions of Section 103 and Sections 141 through 150 of the Code and any regulations promulgated thereunder, to maintain the exclusion from gross income for federal income tax purposes of the interest portion of the payments to be made under the Lease Agreement; and to that end the City shall: (a) comply with the applicable provisions of Section 103 and Sections 141 through 150 of the Code and any regulations promulgated thereunder so long as the Lease Agreement is outstanding; (b) establish such funds, make such calculations and pay such amounts in the manner and at the times required in order to comply with the requirements of the Code relating to required rebates of certain amounts to the United States; and (c) make such reports of such information at the times and places required by the Code. The City Administrator of the City is hereby authorized to adopt written procedures to ensure the City’s compliance with federal tax matters relating to the Lease Agreement. The City covenants that the Lease Agreement is designated as a “qualified tax-exempt obligation” for purposes of Section 265 of the Code relating to the ability of financial institutions to deduct from income for federal income tax purposes interest expense that is allocable to carrying and acquiring tax-exempt obligations. The City and all subordinate entities thereof do not anticipate issuing more than $10,000,000 in tax-exempt obligations in calendar year 2023 other than private activity bonds (other than private activity bonds which are “qualified 501(c)(3) bonds” as defined in the Code). The City represents that the sum of all tax- exempt obligations (other than such private activity bonds) issued by the City and all subordinate entities thereof during calendar year 2023 is not reasonably expected to exceed $10,000,000. The City will timely file Form 8038-G in accordance with the applicable regulations of the Internal Revenue Service. 61 51177551 v2 3 SECTION 7. Filings with Central Repository. In compliance with Section S.C. Code Ann. § 11-1- 85, the City covenants that it will file or cause to be filed with a central repository for further availability in the secondary bond market when requested: (a) a copy of the annual audit of the City within thirty (30) days of the City’s receipt thereof; and (b) within thirty (30) days of the occurrence thereof, relevant information of an event which, in the opinion of the City, adversely affects more than five (5%) of the City’s revenue or its tax base. SECTION 8. Severability. All ordinances, orders, resolutions and parts thereof, procedural or otherwise, in conflict herewith or the proceedings authorizing the execution of the Lease Agreement are, to the extent of such conflict, hereby repealed. SECTION 9. Effective Date; Binding. This Ordinance shall be effective upon its enactment by the City Council of the City, and shall be binding on the City Council of the City of Westminster, South Carolina, and its successors. [Execution page follows] 62 51177551 v2 This Ordinance shall be effective upon its enactment on September 12, 2023. CITY COUNCIL OF THE CITY OF WESTMINSTER, SOUTH CAROLINA (SEAL) ______________________________________ Mayor ATTEST: ___________________________________ City Clerk First Reading: August 8, 2023 Second Reading: September 12, 2023 [Execution page] 63 51177551 v2 Exhibit A Equipment Equipment Estimated Cost Two (2) Police Vehicles $90,000 One (1) Public Works Vehicle $44,045 One (1) Water Pickup $46,000 One (1) Sewer Tractor $55,000 One (1) Leaf Truck $277,000 TOTAL ESTIMATED COST $512,045 64 51177551 v2 Exhibit B Copy of Proposal of First-Citizens Bank & Trust Company (See attached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’S CODE OF ORDINANCES IN CONNECTION THEREWITH , AND OTHER MATTERS RELATED THERETO. NOW THEREFORE, be it ordained by the City Council of the City of Westminster (the “City Council”), the governing body of the City of Westminster, South Carolina (the “City”), in a meeting duly assembled as follows: Section 1 Findings. The City Council hereby makes the following findings of fact in connection with the enactment of this ordinance (this “Ordinance”): (1) T he City is a body politic and corporate located in Oconee County, South Carolina, entitled to exercise all the powers and privileges provided to municipal corporations in the State of South Carolina. (2) Vacant properties have a greater potential than occupied properties to cause significant and costly problems for the City. These properties often require greater levels of service from law enforcement, codes enforcement, and other City services and, thereby create a financial burden for the City and detract from the quality of life of the surrounding neighborhoods and the City as a whole. Vacant buildings are an impediment to neighborhood redevelopment and rehabilitation, decrease property values, and prevent neighborhood stabilization. Vacant properties have a greater likelihood of becoming unsightly, structurally unsound, and otherwise dangerous ; of attracting criminal activ ity, and of otherwise creating a threat to public health, safety, and welfare of neighboring properties and the general public. (3) T he difficulty or inability to contact the owners of abandoned properties presents a significant obstacle in providing effective and prompt enforcement of the provisions of the City of Westminster Code of Ordinances (the “ City Code ”) as they relate to Vacant Buildings. These buildings are more often the subject of foreclosure actions by lien holders, which take considerable time to resolve and further complicate codes enforcement and nuisance abatement efforts. (4) To the extent that Vacant Buildings are or appear to be abandoned, such buildings are recognized as an attractive nuisance under the International Property Maintenance Code adopted by the City and codified by reference at Section 150.08 of the City Code. (5) In order to protect the public ’s health, safety, and welfare, the City Council has determined to amend the City Code and implement a Vacant Building registration policy to establish a method for identifying and managing Vacant Buildings within the City, establishing the responsibilities of O wners of V acant Buildings and structures, and providing for administration, enforcement, and penalties. 68 2 Section 2 Am endment of the City Code . Title XV-LAND USAGE; Chapter 150 - Building Regulations shall be amended as follows to include Chapter 153 – VACANT BUILDING REGISTRATION. Chapter 153 – VACANT BUILDING REGISTRATION § 153.01 – DEFINITIONS Unless otherwise expressly stated, the following terms s hall, for the purposes of this Chapter, have the meanings shown in this Section. Where terms are not defined, through the methods authorized by this Section, such terms shall have ordinarily accepted meanings such as the context implies. Building Report m eans the report of the [codes enforcement officer or fire marshal] with respect to a Vacant Building prepared pursuant to § 153.02(D) of this Chapter. Citation means a charge or formal written accusation of vio lation of a municipal, state or federal law, regulation or ordinance, including any violations of the International Property Maintenance Code as adopted by the City. City means the City of Westminster, South Carolina. City Code means the City of Westminster Code of Ordinances, as subsequently amended. Code Violation means violation of any code adopted and/or enforced by the C ity, which may include but not be limited to the City Code or the IPMC. Construction Board of Appeals me ans the City of Westminster Construction Board of Appeals. Courtesy Regi stration means notification by mail, phone, fax or email to the code enforcement officer notifying them of an extended vacancy of 120 days or more of a primary residence for work, vacation, military, or a medical reason. IPMC means the most current edition of the I nternational Property Maintenance Code adopted by the City. Non-Residential St ructure means any building designed for occupancy for office, commercial, industrial, three or more residential units, or a combination thereof. Owner means any person, firm or corporation having a legal or equitable title in the property; or recorded in the official records of the state, county or municipality as holding title. Property means a lot, plot, premises or parcel of land, including the buildings or structures thereon. 69 3 Rehabilitation Plan means the plan required to be submitted with respect to a Category II or Category III Vacant Building, as further described in § 153.03(B) of this Chapter. Registration Fee me ans a fee for the registration of a Vacant Building in accordance with the terms of this Chapter. Residential Stru cture means a building designed for occupancy as a single family or two- family dwelling. Responsible Local Representative means a person having his or her place of residence or business office within 45 miles of the Vacant Building and designated by the Property Owner as the Agent responsible for operating such Property in compliance with the City Code. For the purposes of this article, the term “Agent” shall refer to the Responsible Local Representative. Responsible Part y means any agent, manager, operator, and/or management company of a Vacant Building, as designated by the Owner. Secure means a building or portion of a building is closed or locked for entry by normal means other than boarding. Unoccupied means a building which is not being used for a legal occupancy. Vacant Building means any structure built for occupancy of residential, commercial or industrial uses that is continually unoccupied. Vacant Building C ategory means, with respect to each of the following, the classification of a Vacant Building as: (A) Category I: No current Code Violations on the Vacant Building or the Property. 1. The building is Secure, not boarded. 2. The building is structurally sound with no Code Violations. 3. The Property is maintained to the minimum requirements of the Code by the Owner or Responsible Party. (B) C ategory II : Minimal Code Violations. 1. The building is boarded and Secure. 2. The building is structurally sound with minor Code Violations related to property maintenance that do not involve the structure of the Vacant Building. 3. The Property is not regularly maintained. 70 4 (C) Category III: Substantial Code Violations. 1. The building is not Secure or boarded. 2. Structural deficiencies or Code Violations that create risks to health and safety are evident, or there is a history of criminal activity at the address. 4. Structure is unfit for occupancy. 5. The Property is not maintained. Vacant Building Plan m eans a plan containing the information required pursuant to § 153.03 of this Chapter. § 153.02 – REGISTRATION OF VACANT BUILDINGS (A ) Except as provided in subsection (B) below, all Vacant Buildings shall be registered with the Code E nforcement Official within 120 days of becoming a Vacant Building as defined in § 153.01. Registration is valid for one year or a pro -rated portion thereof and must be renewed annually on November 6th or the next closest business day of the 6th falls on a weekend. (B) Exemptions from registration: 1. Residential structures that are used as residential rentals and have active residential rental business license permits, if required; 2. R esidential or Non- Residential Structures actively listed and marketed for sale or lease by a licensed real estate com pany or managed by a licensed property management company for not more than one year and that meet minimum building codes as determined by either the Code Enforcement Officer or the Fire Marshall; 3. C ommercial or residential structures that have multiple units in which at least one unit is occupied; 4. Accessory structures not designed for occupancy; and/or 5. Buildings that serve as a primary residence in which the Owner is away for more than 120 days for work, vacation, military or medical reason; provided, that the Building and Property is maintained to minimum requirements of the City Code and the Owner provides a Courtesy Registration. (C) If any Vacant Building remains Vacant at the expiration of any registration period, the Owner shall re -register such Vacant B uilding and pay the annual registration and inspection fees. 71 5 (D) The Owner registering a Vacant Building shall supply the following information on an authorized form provided by the Code Enforcement Official: 1. Name, address, and telephone number of the Owner; 2. Name, address, and telephone number of the Responsible Party, if any; 3. Name, address, and telephone number of any Responsible Local Representative, which may be the Responsible Party, if the Owner’s residence or business address in more than 45 miles from the Vacant Building; 4. Tax parcel identification number of the premise on which the Vacant Building is situated; 5. The common address of the Vacant B uilding; and 6. A Vacant Building Plan in accordance with § 153.03 of this Chapter. (E) Following the registration of the Vacant Building, the City’s Code E nforcement Official shall conduct an inspection of the Property and premises to determine any Code Violations and to verify the Vacant Building Category. 1. The Code Enforcement Official, as applicable, will provide the Owner of the Vacant B uilding with a Building Report (i) stating current condition and apparent use (i.e., Residential Structure or Non -Residential Structure) of the Vacant Building and Property, (ii) listing any apparent Code Violations, (iii) stating whether the Vacant Building constitutes a nuisance, and any findings or reasons therefor; (iv) assigning a Vacant Building Category to the Vacant Building; and (v) notifying the Owner of the applicable Registration Fee. 2. Within 15 days of receipt of such findings, the Owner may request a reinspection of the Vacant Building regarding any findings included in the Building Report, including the applicable Vacant Building Category. Any such request must be submitted in-writing to the Code Enforcement Official, as applicable. The decision of the Code E nforcement Official, as applicable after such reinspection shall be the final decision of the City, subject to an appeal pursuant to § 153.06 of this Chapter. (F) All Vacant Buildings must remain Secure and/or boarded in accordance with § 150.08 of the City Code. (G) Upon request by the Code E nforcement Official, the Owner shall post “ No Trespass” placards on the Property . Additional employment of security services for non- residential properties for a specified number of hours every day may be required by the 72 6 police chief or his/her designee on the basis of the property history of code or criminal violations. (H) The Owner must designate a Responsible L ocal Representative if their place of residence or business address is more than 45 miles from the Vacant Building. The responsible local representative shall act as an agent for the Property Owner for purposes of accepting legal service; however, the Owner remains personally liable in criminal prosecutions for Code Violations. The Responsible L ocal Representative must be readily available at the number provided in the event of an emergency or catastrophe. § 153.03 – ESTABLISHMENT OF A VACANT BUILDING PLAN (A) All Owners of Vacant Buildings shall provide the following in a Vacant Building Plan along with the completed form required pursuant to § 153.02(D) of this Chapter: 1. A site plan of the Property; 2. A layout of the Vacant Building and other structures on the Property, if non - residential; 3. A plan of action to secure, monitor and maintain the Vacant Building and Property in conformance with this Chapter. 4. Written consent by the Owner, allowing City officials to enter and inspect the Property. (B) Where a Vacant Building is assigned a Vacant Building Category II or III in a Building Report, the Owner shall submit, or cause to have submitted, a Rehabilitation Plan within 30 days of receipt of such Building Report. The Rehabilitation Plan shall contain the following: 1. A plan to make the Vacant Building ready for occupancy with sufficient detail regarding the proposed repair or rehabilitation of the Vacant Building, and the timing thereof, to enable the Code E nforcement Official to determine the adequacy of such plan. 2. For Vacant Buildings that are identified in the Building Report as being or containing a public nuisance, the Vacant Building Plan shall contain a plan of action to remedy such public nuisances within not more than [90] days; 3. Owners of Vacant Buildings classified as Vacant Building Category III shall meet with the Code Enforcement Official and fire marshal/fire chief to review structural deficiencies and determine a plan to respond to fire or other emergency, and such fi ndings and recommendations shall be part of the Rehabilitation Plan. 73 7 (C) A Vacant Building Plan and Rehabilitation Plan, if applicable, shall be subje ct to the approval of the C ode Enforcement Official , as applicable. The Code E nforcement Official, as applicable, may reject a Vacant Building Plan or Rehabilitation Plan, or any term thereof, by providing the Owner with written notification of such rejection, which shall include the reasons therefor, and may provide suggested revisions that would be acceptable. In such event, the Owner shall revise the If the Property is subject to a Vacant Building P lan, including a Rehabilitation Plan, any conveyance of such P roperty is subject to the terms of the Vacant Building P lan. The transferee may apply to the C ity to be released from the requirements of such Vacant Building P lan or Rehabilitation Plan or subject to a revised Vacant Building Plan and Rehabilitation Plan, if applicable. § 153.04 – REGISTRATION FEE FOR VACANT BUILDINGS (A) Annual R egistration Fees are based on the type of Vacant Building, the applicable Vacant Building Category, and the number of years that a Vacant Building has remained continuously vacant (commencing upon the effective date of Ordinance No. [___], pursuant to which this Chapter was enacted). All fees are due at the time of registration or renewal. 1. Registration Fees for Non-Residential Structures are as follows: Year Category I Category II Category III Initial Registration $50 $50 $50 First Annual Renewal $100 $150 $200 Second Annual Renewal $500 $750 $1,000 Third Annual Renewal $1,000 $1,500 $2,000 Each year thereafter $1,500 $2,250 $3,000 2. Registration Fees for Residential Structures are as follows: Year Category I Category II Category III Initial Registration $0 $0 $0 First Annual Renewal $50 $50 $100 Second Annual Renewal $50 $250 $500 Third Annual Renewal $50 $500 $1,000 Each year thereafter $50 $500 $1,000 74 8 3. An annual compliance inspection fee of $50.00, in addition to the Registration Fee, is required on all Vacant Buildings not exempt pursuant to § 153.02(B). The fee shall be paid at the time of initial registration or registration renewal of a Vacant Building. 4. Upon determination that a Vacant Building has not been registered in accordance with this Chapter, the City may imposed fines in addition to the annual registration fees in accordance with § 153.05. (B) The Owner shall pay the applicable Registration Fee within 30 days of receipt of the Building Report; provided, however, the payment of a Registration Fee shall be stayed during the pendency of any properly filed appeal pursuant to § 153.06 of this Chapter. The failure of the Owner to pay a Registration Fee when due shall constitute a violation of this Chapter, subject to enforcement and penalties pursuant to §153.05 of this Chapter . This action may result in a lien being placed upon the Property. (C) The following shall be exempt from the payment of Registration Fees; provided that the Owner must request an exemption from the City in writing, which request shall include information satisfactory to the City that one or more of the following conditions exist: 1. R esidential or Non- Residential Structures actively listed and marketed for sale or lease by a licensed real estate company or managed by a licens ed property management company for more than one year and that meet minimum building codes; 2. R esidential or Non- Residential Structures that are actively and continually under renovation for a period of up to one year . If renovations take longer than one year , the Owner may request an extension of such exemption for additional six -month periods, subject to an inspection by the C ode Enforcement Official, as applicable to confirm that renovations remain active and continuous; 3. Residential or Non- Residential Structures that are in probate and actively being transferred; 4. Residential or Non- Residential Structures damaged by a fire or other catastrophic event for a period of up to one year; 5. Vacant Buildings assigned Vacant Building Category I that have not been the subject of a Citation within the immediately preceding one-year period; and 6. Buildings that are structurally deficient that have been ordered by the C ity to be demolished and removed, in which the Owner has provided consent to the City to demolish, and the City has accepted the consent. 75 9 (D) An Owner may seek an e xemptions from a R egistration Fees for special circumstances not listed in § 153.04(C) by application, in writing, to Construction Board of Appeals, which shall include the specific justification for the exemption and documentation substantiating such justification. § 153.05 – ENFORCEMENT AND PENALTIES Upon determination that a n Owner has failed to register a Vacant Building, pay a Registration Fee, carry out a Vacant Building Plan or Rehabilitation Plan, or otherwise comply with the provisions of Chapter shall be subject to an ordinance summons and a fine of up to $500.00 per occurrence, with each day of such non- compliance constituting a separate occurrence. § 153.06 – APPEAL Any person aggrieved by the requirements of this Chapter or any determination or finding of the Code E nforcement Official, as applicable hereunder may file a n appeal with the Construction Board of Appeals. Any such appeal must be made in writing to the Code Enforcement Official , as applicable, must include the specific requirement, finding, or determination for which such appeal is sought, and must contain documentation or other information as may be necessary to support such appeal, and must be made within 30 days of the date on which the final decision of the C ode Enforcement Official, as applicable with respect to such requirement, determination, or finding is made. Any person aggrieved by a final decision issued under this S ection by the Construction Board of Appeals, may seek relief in any court of competent jurisdiction, as provided by the law. Section 3 Effective Date. This Ordinance is to be effective as of the date of its second and final reading. Owners have until [July 31, 2023,] to comply with the terms of the Chapter of the City’s Code of Ordinances enacted hereby. Section 4 Miscellaneous. (a) Affirmation of Findings. It is hereby found and determined that each statement of fact set forth in this Ordinance is in all respects true and correct. (b) Severability. If any Section, paragraph, clause or provision of this Ordinance or the Chapter enacted hereby shall be held invalid, the invalidity of such Section, paragraph, clause or provision shall not affect any of the remaining provisions of this Ordinance. (c) Saving Clause. Nothing in this Ordinance shall be construed to affect any suit or proceeding impending in any court, or any rights acquired or liability incurred, or any cause of action acquired or existing, under any act or ordinance hereby repealed; nor shall any just or legal right or remedy of any character be lost, impaired or affected by this Ordinance. 76 10 (d) Inconsistency. All ordinances, resolutions or parts of any ordinances or resolutions inconsistent or in conflict with the provisions of this Ordinance are here by repealed to the extent of the conflict or inconsistency. DONE AND ENACTED IN COUNCIL ASSEMBLED, this 12th day of September 2023. CITY OF WESTMINSTER, SOUTH CAROLINA _________________________________________ Brian Ramey, Mayor [SEAL] Rebecca Overton, City Clerk First Reading: Public Hearing: Second Reading: Reviewed by City Attorney and approved as to form Andrew Holliday, City Attorney 77 RESOLUTION NO. 08-08-2023-01 A RESOLUTION ADOPTING THE EMERGENCY OPERATIONS PLAN AND EMERGENCY PREPAREDNESS GUIDELINES; AND OTHER MATTERS RELATED THERETO WHEREAS, the City of Westminster, South Carolina (the “City”) is a legally constituted municipal corporation incorporated by Act No. 744 of the Acts and Joint Resolutions of the General Assembly of the State of South Carolina for the year 1875, and maintains a combined utility system (the “System”); and WHEREAS, the City recognizes the threat natural hazards pose to people and property; and WHEREAS, undertaking hazard mitigation actions before disasters occur will reduce the potential for harm to people and property and save taxpayer dollars; and WHEREAS, an adopted all hazards mitigation plan is required as a condition of future grant funding of mitigation projects; and WHEREAS, the City participated jointly in the planning process with the other units of Government in Oconee County and Anderson County to prepare an all hazards mitigation plan; and WHEREAS, the City adopted its Emergency Operations Plan and Emergency Preparedness Guidelines on November 15, 2022; WHEREAS, the Multi- Jurisdictional Hazard Mitigation Plan, Anderson and Oconee County was adopted in March 2023 by the respective governing bodies; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Westminster (the “Council”), the governing body of the City, in a meeting duly assembled: H ereby adopts and incorporates the Multi-Jurisdictional Hazard Mitigation Plan, Anderson and Oconee County adopted in March 2023 into its Emergency Operations Plan & Emergency Preparedness Guidelines – amended February 8, 2022, the Mitigation Plan, in its entirety as an official plan and will undertake annual recording of hazard events, their impact duration and cost. [Remainder of Page Intentionally Left Blank] 78 DONE AND ADOPTED IN COUNCIL ASSEMBLED, this 8th day of August 2023. CITY OF WESTMINSTER, SOUTH CAROLINA _________________________________________ Brian Ramey, Mayor [SEAL] Rebecca Overton, City Clerk 79 U.S. Department of Homeland Security Region 4 3005 Chamblee Tucker Road Atlanta, GA 30341 May 26, 2023 Ms. Candice Shealey State Hazard Mitigation Officer South Carolina Emergency Management Division 2779 Fish Hatchery Road West Columbia, SC 29172 Anderson and Oconee County Regional Hazard Mitigation Plan Dear Ms. Candice Shealey: We are pleased to inform you the Anderson and Oconee County Regional Hazard Mitigation Plan update complies with the Federal hazard mitigation planning requirements resulting from the Disaster Mitigation Act of 2000, as contained in 44 CFR §201.6. Effective May 26, 2023, the plan is approved for a period of five (5) years to May 25, 2028. In addition, the following jurisdictions have met the requirements for addressing all dam risks listed in the local mitigation plan: Oconee County. Enclosed is the status of all participating jurisdictions. Approved jurisdictions are eligible applicants through the State for the following mitigation grant programs administered by the Federal Emergency Management Agency (FEMA): • Hazard Mitigation Grant Program (HMGP) • Flood Mitigation Assistance (FMA) • Building Resilient Infrastructure and Communities (BRIC) • Rehabilitation of High Hazard Potential Dams Grant Program (HHPD) Please note that all funding requests will be evaluated individually according to the program’s specific eligibility requirements. The State and all plan participants should be commended for their close coordination and communications with our office in the review and subsequent approval of the plan. If you or any plan participant need assistance, please do not hesitate to contact Jake Grabowsky, of my staff, at (202) 856-1901. Sincerely, Kristen M. Martinenza, P.E., CFM Branch Chief, Risk Analysis Branch FEMA Region 4 Enclosure Reference: 80 Enclosure: Plan Participant Status List Attached is the list of participating jurisdictions in the referenced hazard mitigation plan. Community Name Jurisdiction Status Date Approved by FEMA 1) Anderson city APA 2) Anderson County APA 3) Belton city APA 4) Honea Path town APA 5) Iva town APA 6) Oconee County Approved 5/26/23 7) Pelzer town APA 8) Pendleton town APA 9) Salem town APA 10) Seneca city APA 11) Starr town APA 12) Walhalla city APA 13) Westminster city APA 14) West Pelzer town APA 15) West Union town APA 16) Williamston town APA 81 Multi-Jurisdictional Hazard Mitigation Plan Anderson & Oconee County March 2023 1 82 TABLE OF CONTENTS Introduction ................................ ................................ ............. SECTION 1 Planning Process ................................ ................................ ...... SECTION 2 Community Profile ................................ ................................ ... SECTION 3 Hazard Identification ................................ ................................ SECTION 4 Hazard Profiles ................................ ................................ ......... SECTION 5 Vulnerability Assessment ................................ ......................... SECTION 6 Capability Assessment ................................ .............................. SECTION 7 Mitigation Strategy ................................ ................................ ... SECTION 8 Mitigation Action Plan ................................ .............................. SECTION 9 Plan Maintenance ................................ ................................ .. SECTION 10 Plan Adoption ................................ ................................ ......... APPENDIX A Meeting Times & Rosters ................................ ....................... APPENDIX B Climate Change ................................ ................................ ...... APPENDIX C High Hazard Potential Dams ................................ ................. APPENDIX D Flood Maps ………………………………………………………………………..APPENDIX E 2 83 Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 SECTION 1 INTRODUCTION This section provides a general introduction to the Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan. It consists of the following five subsections: ❖ 1.1 Background ❖ 1.2 Purpose ❖ 1.3 Scope ❖ 1.4 Authority ❖ Summary of Plan Contents ____________________________________________________________________________________________ 1.1 BACKGROUND Natural and man-made hazards, such as floods, hurricanes, and fires, are a part of the world around us. In some cases, their occurrence is natural and inevitable, and there is little we can do to control their force and intensity. In others, we have more power to control the intensity and probability but can never truly eliminate the threat entirely. In either case, we must consider these hazards to be legitimate and significant threats to human life, safety, and property. Anderson County and Oconee County are located in the northwestern part of South Carolina. This area is vulnerable to a wide range of natural hazards such as hurricanes, flood s, severe thunderstorms, winter storms, and tornados. It is also vulnerable to man-made hazards, including hazardous materials incidents and transportation incidents. These hazards threaten the life and safety of residents and have the potential to damage or destroy both public and private property, disrupt the local economy, and impact the overall quality of life of individuals who live, work, and vacation within the counties. While the threat from hazardous events may never be fully eliminated, there is much we can do to lessen potential impacts upon our community and our citizens. By minimizing the impact of hazards upon our built environment, we can prevent such events from resulting in disasters. The concept and practice of reducing risks to people and property from known hazards is generally referred to as hazard mitigation. Hazard mitigation techniques include both structural measures (such as strengthening or protecting buildings and infrastructure from the destructive forces of potential hazards) and non-structural measures (such as the adoption of sound land use policies and the creation of public awareness programs). It is widely accepted that the most effective mitigation measures are implemented at the local government level, where decisions on the regulation and control of development are ultimately FEMA Definition of Hazard Mitigation: “Any sustained action taken to reduce or eliminate the long-term risk to human life and property from hazards.” 3 84 SECTION 1: INTRODUCTION Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 made. A comprehensive mitigation approach addresses hazard vulnerabilities that exist today and in the foreseeable future. Therefore, it is essential that projected patterns of future development are evaluated and considered in terms of how that growth will increase or decrease a community’s overall hazard vulnerability. A key component in the formulation of a comprehensive approach to hazard mitigation is to develop, adopt, and update a local hazard mitigation plan as needed. A hazard mitigation plan establishes the broad community vision and guiding principles for reducing hazard risk and, furthermore, proposes specific mitigation actions to eliminate or reduce identified vulnerabilities. Both counties and their respective municipalities participating in the Anderson and Oconee County Multi- Jurisdictional Hazard Mitigation Plan have an existing hazard mitigation plan that has evolved over the years, as described in Section 2, Planning Process. This update of the Plan draws from the previous plan to document the efforts of each jurisdiction to incorporate hazard mitigation principles and practices into routine government activities and functions. At its core, this Plan recommends specific actions to minimize hazard vulnerability and protect residents from losses to those hazards that pose the greatest risk. These mitigation actions go beyond simply recommending structural solutions to reduce existing vulnerability, such as elevation, retrofitting, and acquisition projects. Local policies on community growth and development, incentives for natural resource protection, and public awareness and outreach activities are examples of other actions considered to reduce each County’s vulnerability to identified hazards. This Plan remains a living document with implementation and evaluation procedures established to help achieve meaningful objectives and successful outcomes over time. 1.1.1 The Disaster Mitigation Act and the Flood Insurance Reform Acts In an effort to reduce the Nation's mounting natural disaster losses, the U.S. Congress passed the Disaster Mitigation Act of 2000 (DMA 2000) in order to amend the Robert T. Stafford Disaster Relief and Emergency Assistance Act. Section 32 2 of DMA 2000 emphasizes the need for state, local, and Tribal government entities to closely coordinate on mitigation planning activities and makes the development of a Hazard Mitigation Plan a specific eligibility requirement for any local or Tribal gove rnment applying for federal mitigation grant funds. In short, if a jurisdiction is not covered by an approved mitigation plan, it will not be eligible for mitigation grant funds. These funds include the Hazard Mitigation Grant Program (HMGP) and the Building Resilient Infrastructure and Communities (BRIC) program, both of which are administered by the Federal Emergency Management Agency (FEMA) under the Department of Homeland Security. Communities with an adopted and federally approved hazard mitigation pla n thereby become pre - positioned and more apt to receive available mitigation funds before and after the next disaster strikes. Additionally, the Flood Insurance Reform Act of 2004 (P.L. 108 -264) created two new grant programs, Severe Repetitive Loss (SRL) and Repetitive Flood Claim (RFC) and modified the existing Flood Mitigation Assistance (FMA) program. One of the requirements of this Act is that a FEMA-approved Hazard Mitigation Plan is now required if communities wish to be eligible for these FEMA mitigation programs. However, as of early 2014, these programs have been folded into a single Flood Mitigation Assistance (FMA) program. This change was brought on by new, major federal flood insurance legislation that was passed in 2012 under the Biggert-Waters Flood Insurance Reform Act (P.L. 112-141) and the subsequent Homeowner 4 85 SECTION 1: INTRODUCTION Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Flood Insurance Affordability Act in 2014 that revised Biggert-Waters. These acts made several changes to the way the National Flood Insurance Program is to operate, including raises in rates to reflect true flood risk and changes in how Flood Insurance Rate Map (FIRM) updates impact policyholders. These acts further emphasize Congress’ focus on mitigating vulnerable structures. The Multi-Jurisdictional Hazard Mitigation Plan has been prepared in coordination with FEMA Region IV and the South Carolina Emergency Management Division (SCEMD) to ensure that the Plan meets all applicable FEMA and state requirements for hazard mitigation plans. A Local Mitigation Plan Review Tool, found in Appendix C, provides a summary of federal and state minimum standards and notes the location where each requirement is met within the Plan. 1.2 PURPOSE The purpose of the Anderson and Oconee County Multi-Jurisdictional Hazard Mitigation Plan is to: ❖ Reduce risk to people, property, and the critical infrastructure ❖ Increase public awareness and education about the Plan and the planning process ❖ Maintain grant eligibility for participating jurisdictions ❖ Maintain compliance with state and federal legislative requirements for local hazard mitigation plans 1.3 SCOPE The focus of the Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan is on hazards determined to be “high” or “moderate” risks to the respective Counties, as determined through a detailed hazard risk assessment. Other hazards that pose a “low” or “negligible” risk will continue to be evaluated during future updates to the Plan, but they may not be fully addressed until they are determined to be of high or moderate risk. This enables the participating jurisdictions to prioritize mitigation actions based on those hazards which are understood to present the greatest risk to lives and property. The geographic scope (i.e., the study area) for the Plan includes all of Anderson County, Oconee County, and includes its incorporated jurisdictions and unincorporated areas. Table 1.1 indicates the participating jurisdictions. TABLE 1.1: PARTICIPATING JURISDICTIONS IN THE HAZARD MITIGATION PLAN Anderson County Anderson Belton Honea Path Iva Pelzer Pendleton Starr West Pelzer Williamston Oconee County Salem Seneca Wahalla West Union Westminster 5 86 SECTION 1: INTRODUCTION Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 1.4 AUTHORITY The Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan has been developed in accordance with current state and federal rules and regulations governing local hazard mitigation plans and has been adopted by each participating jurisdiction in accordance with standard local procedures. Copies of the adoption resolutions for each participating jurisdiction are provided in Appendix A. The Plan shall be routinely monitored and revised to maintain compliance with the following provisions, rules, and legislation: ❖ Section 322, Mitigation Planning, of the Robert T. Stafford Disaster Relief and Emergency Assistance Act, as enacted by Section 104 of the Disaster Mitigation Act of 2000 (P.L. 106-390) ❖ FEMA's Final Rule published in the Federal Register, at 44 CFR Part 201 (201.6 for local mitigation planning requirements and 201.7 for Tribal planning requirements) ❖ Flood Insurance Reform Act of 2004 (P.L. 108-264), Biggert-Waters Flood Insurance Reform Act of 2012 (P.L. 112-141), and the Homeowner Flood Insurance Affordability Act ❖ National Dam Safety Program Act of 2020, (P.L. 116-260) and the National Program for Inspection of Non-Federal Dams of 1972 (P.L. 92-367) 1.5 SUMMARY OF PLAN CONTENTS The contents of this Plan are designed and organized to be as reader-friendly and functional as possible. While significant background information is included on the processes used and studies completed (i.e., risk assessment, capability assessment), this information is separated from the more meaningful planning outcomes or actions (i.e., mitigation strategy, mitigation action plan). Section 2, Planning Process, provides a complete narrative description of the process used to prepare the Plan. This includes the identification of participants on the planning team and describes how the public and other stakeholders were involved. It also includes a detailed summary for each of the key meetings held, along with any associated outcomes. The Community Profile , located in Section 3, provides a general overview of each County, including prevalent geographic, demographic, and economic characteristics. In addition, building characteristics and land use patterns are discussed. This baseline information provides a snapshot of the planning area and helps local officials recognize those social, environmental, and economic factors that ultimately play a role in determining the county’s vulnerability to hazards. The Risk Assessment is presented in three sections: Section 4, Hazard Identification; Section 5, Hazard Profiles; and Section 6, Vulnerability Assessment. Together, these sections serve to identify, analyze, and assess hazards that pose a threat to Anderson and Oconee County. The Risk Assessment also attempts to define any hazard risks that may uniquely or exclusively affect specific areas of the Counties. The Risk Assessment begins by identifying hazards that threaten Anderson and Oconee Counties. Next, detailed profiles are established for each hazard which build on available historical data from past hazard occurrences, spatial extent, and probability of future occurrences. This section culminates in a hazard risk ranking based on conclusions regarding the frequency of occurrence, spatial extent, and potential impact highlighted in each of the hazard profiles. In the vulnerability assessment, SC SHELDUS loss estima tion information is used in conjunction with GIS analysis to evaluate known hazard risks by 6 87 SECTION 1: INTRODUCTION Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 their relative long-term cost for expected damages. In essence, the information generated through the risk assessment serves a critical function as the participating jurisdictions in Anderson and Oconee County seek to determine the most appropriate mitigation actions to pursue and implement —enabling them to prioritize and focus their efforts on hazards of greatest concern and structures or planning areas facing the greatest risk(s). The Capability Assessment, found in Section 7, provides a comprehensive examination of each County’s capacity to implement meaningful mitigation strategies and identifies opportunities to increase and enhance that capacity. Specific capabilities addressed in this section include planning and regulatory capability, staff and organizational (administrative) capability, technical capability, fiscal capability, and political capability. Information was obtained through the u se of a detailed survey questionnaire and an inventory and analysis of existing plans, ordinances, and relevant documents. The purpose of this assessment is to identify any existing gaps, weaknesses, or conflicts in programs or activities that may hinder m itigation efforts and to identify activities that should be built upon in order to establish a successful and sustainable local hazard mitigation program. The Risk Assessment and Capability Assessment collectively serve as a basis for determining the goals for the Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan, each contributing to the development, adoption, and implementation of a meaningful and manageable Mitigation Strategy that is based on accurate background information. The Mitigation Strategy, found in Section 8, consists of broad goals as well as an analysis of hazard mitigation techniques for the jurisdictions participating in the Plan to consider in order to reduce hazard vulnerabilities. The strategy provides the foun dation for a detailed Mitigation Action Plan , found in Section 9, which links specific mitigation actions for each jurisdiction to locally assigned implementation mechanisms and target completion dates. Together, these sections are designed to make the Pla n both strategic, through the identification of long -term goals, and functional, through the identification of immediate and short-term actions that will guide day-to-day decision-making and project implementation. In addition to the identification and pr ioritization of possible mitigation projects, emphasis is placed on the use of program and policy alternatives to help make each County less vulnerable to the damaging forces of hazards while improving the economic, social, and environmental health of the community. The concept of multi -objective planning was emphasized throughout the planning process, particularly in identifying ways to link, where possible, hazard mitigation policies and programs with complimentary community goals related to disaster reco very, housing, economic development, recreational opportunities, transportation improvements, environmental quality, land development, and public health and safety. Plan Maintenance, found in Section 10, includes the procedures that the jurisdictions participating in the Plan will take to ensure the Plan’s continuous long-term implementation. The procedures also include the manner in which the Plan will be regularly evaluated and updated to remain a current and meaningful planning document. 7 88 Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 SECTION 2 PLANNING PROCESS This section describes the planning process undertaken to develop the Anderson & Oconee County Multi- Jurisdictional Hazard Mitigation Plan. It consists of the following eight subsections: ❖ 2.1 Overview of Hazard Mitigation Planning ❖ 2.2 History of Hazard Mitigation Planning in Anderson & Oconee County ❖ 2.3 Preparing the 2023 Plan ❖ 2.4 The Hazard Mitigation Planning Team ❖ 2.5 Meetings and Workshops ❖ 2.6 Involving the Public ❖ 2.7 Involving the Stakeholders ❖ 2.8 Documentation of Plan Progress 2.1 OVERVIEW OF HAZARD MITIGATION PLANNING Local hazard mitigation planning is the process of organizing community resources, identifying and assessing hazard risks, and determining how to best minimize or manage those risks. This process culminates in a hazard mitigation plan that identifies specific mitigation actions, each designed to achieve both short-term planning objectives and a long-term community vision. To ensure the functionality of a hazard mitigation plan, responsibility is assigned for each proposed mitigation action to a specific individual, department, or agency along with a schedule or target completion date for its implementation (see Section 10: Plan Maintenance). Plan maintenance procedures are established for the routine monitoring of implementation progress as well as the evaluation and enhancement of the mitigation plan itself. These plan maintenance procedures ensure that the Plan remains a current, dynamic, and effective planning document over time that becomes integrated into the routine local decision-making process. Communities that participate in hazard mitigation planning have the potential to experience many benefits, including: ❖ Saving lives and property ❖ Saving money ❖ Speeding up the recovery process following disasters ❖ Reducing future vulnerability through wise development and post-disaster recovery and reconstruction 44 CFR Requirement 44 CFR Part 201.6(c)(1): The plan shall include documentation of the planning process used to develop the plan, including how it was prepared, who was involved in the process and how the public was involved. 8 89 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 ❖ Expediting the receipt of pre-disaster and post-disaster grant funding ❖ Demonstrating a firm commitment to improving community health and safety Typically, communities that participate in mitigation planning are described as having the potential to produce long -term and recurring benefits by breaking the repetitive cycle of disaster loss. A core assumption of hazard mitigation is that the investments made before a hazard event will significantly reduce the demand for post -disaster assistance by lessening the need for emergency response, repair, recovery, and reconstruction. Furthermore, mitigation practices will enable local residents, businesses, and industries to re-establish themselves in the wake of a disaster, getting the community economy back on track sooner and with less interruption. The benefits of mitigation planning go beyond solely reducing hazard vulnerability. Mitigation measures such as the acquisition or regulation of land in known hazard areas can help achieve multiple community goals, such as preserving open space, maintaining environment al health, and enhancing recreational opportunities. Thus, it is vitally important that any local mitigation planning process be integrated with other concurrent local planning efforts, and any proposed mitigation strategies must consider other existing co mmunity goals or initiatives that will either help complement or hinder their future implementation. 2.2 HISTORY OF HAZARD MITIGATION PLANNING IN ANDERSON AND OCONEE COUNTIES Each of the 14 participating jurisdictions listed below has a previously adopted hazard mitigation plan. The Federal Emergency Management Agency (FEMA) approval dates for each of these plans are listed below: ❖ Anderson and Oconee County Hazard Mitigation Plan (2017) ❖ City of Anderson ❖ City of Belton ❖ Town of Honea Path ❖ Town of Iva ❖ Town of Pelzer ❖ Town of Pendleton ❖ Town of Salem ❖ Town of Seneca ❖ Town of Starr ❖ City of Wahalla ❖ Town of Westminster ❖ Town of West Union ❖ Town of Williamston ❖ Unincorporated Anderson County ❖ Unincorporated Oconee County 9 90 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 The existing county -level plan was developed using the multi -jurisdictional planning process recommended by FEMA. For this plan update the same process was utilized, and all of the jurisdictions that participated in the previous planning effort have participated in the development of this plan update. 2.3 PREPARING THE 2023 PLAN Hazard mitigation plans are required to be updated every five years to remain eligible for federal mitigation funding. To simplify planning efforts, the jurisdictions in Anderson and Oconee Counties decided to join together to create the Anderson and Oconee County Multi-Jurisdictional Hazard Mitigation Plan. This allows resources to be shared amongst the participating jurisdictions and eases the administrative duties of all of the participants. To prepare the Plan, a team was facilitated under the leadership of James McAdams, Emergency Planner. The FEMA recommended mitigation planning process (Publication Series 386 and Local Mitigation Plan Review Guide) was followed and further recommendations were provided by South Carolina Emergency Management Division (SCEMD) mitigation planning staff.1 The Local Mitigation Plan Review Tool, found in Appendix C, provides a detailed summary of FEMA’s current minimum standards of acceptability for compliance with DMA 2000 and notes the location where each requirement is met within this Plan. These standards are based upon FEMA’s Final Rule as published in the Federal Register in Part 201 of the Code of Federal Regulations (CFR). The Planning Team (described in Section 2.4) used FEMA’s Local Mitigation Plan Review Guide (April 2023) for reference as they completed the Plan. Additionally, the Planning Team determined that it was important to include and analyze some man- made hazards in the Plan to provide a more comprehensive approach to hazard management within the county. Although this is not a requirement as per regulations regarding hazard mitigation planning at the state or federal level, it is a noteworthy step in the direction of an all -hazards approach to risk analysis and management. Key elements from the previously approved plan are referenced throughout the document (e.g., existing actions) and also required a discussion of changes made. For example, all of the risk assessment elements needed to be updated to include the most recent information. It was also necessary to review the goals for the county. The Capability Assessment section includes updated information for all of the participating jurisdictions and the Mitigation Action Plan provides implementation status updates for all of the actions identified in the previous plans. The process used to prepare this Plan included twelve major steps that were completed over the course of approximately 6 months beginning in November 2022. Each of these planning steps (illustrated in Figure 10 91 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 2.1) resulted in critical work products and outcomes that collectively make up the Plan. Specific plan sections are further described in Section 1: Introduction. Over the past five years, each participating jurisdiction has been actively working to implement the existing plans. This is documented in the Mitigation Action Plan through the implementation status updates for each of the Mitigation Actions. The Capability Assessment also documents changes and improvements in the capabilities of each participating jurisdiction to implement the Mitigation Strategy. FIGURE 2.1: MITIGATION PLANNING PROCESS FOR ANDERSON & OCONEE COUNTY As is further detailed below, the planning process was conducted through Hazard Mitigation Planning meetings comprised primarily of local government staff from each of the participating jurisdictions and advisory stakeholders. 2.4 THE HAZARD MITIGATION PLANNING TEAM In order to guide the development of this Plan, Anderson County, Oconee County, and their respective jurisdictions created the Hazard Mitigation Planning Team (also known as the Planning Team). The Hazard Mitigation Planning Team represents a community-based planning team made up of 11 92 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 representatives from various county and municipal depa rtments and other key stakeholders identified to serve as critical partners in the planning process. In February 2022, the Steering Committee, involving Emergency Management representatives from Anderson and Oconee County met to begin discussing the plan update process and stakeholders that needed to be involved. The members of this committee were: Josh Hawkins, Anderson County Emergency Management Director , Scott Krien, Oconee County Emergency Services Director, and James McAdams, Anderson County Emergenc y Planner. In April 2022, the Hazard Mitigation Planning Team members engaged in regular discussions as well as held local meetings and planning workshops to discuss and complete tasks associated with preparing the Plan. This working group coordinated on a ll aspects of plan preparation and provided valuable input to the process. In addition to regular meetings, team members routinely communicated and were kept informed through an e-mail distribution list. Specifically, the tasks assigned to the Hazard Mitigation Planning Team members included: ❖ Participate in Hazard Mitigation Planning Team meetings and workshops ❖ Provide best available data as required for the Risk Assessment portion of the Plan ❖ Help review the local Capability Assessment information and provide copies of any mitigation or hazard-related documents for review and incorporation into the Plan ❖ Support the development of the Mitigation Strategy, including the design and adoption of countywide goal statements ❖ Help design and propose appropriate mitigation actions for their department/agency for incorporation into the Mitigation Action Plan ❖ Review and provide timely comments on all study findings and draft plan deliverables ❖ Support the adoption of the 2023 Anderson and Oconee County Hazard Mitigation Plan Table 2.1 lists the members of the Hazard Mitigation Planning Team who were responsible for participating in the development of the Plan. Team members are listed in alphabetical order by last name. TABLE 2.1: MEMBERS OF THE HAZARD MITIGATION PLANNING TEAM NAME POSITION DEPARTMENT/AGENCY Chad McBride Sheriff Anderson County Sheriff’s Office Josh Hawkins Emergency Management Director Anderson County Sheriff’s Office Scott Krien Emergency Services Director Oconee County Andrew Strickland Assistant City Manager City of Anderson Alan Sims City Manager City of Belton Leslie Walker Town Clerk Town of Honea Path Timothy Taylor Town Clerk Town of Iva Cheryl Boudreau Municipal Clerk Town of Pelzer 12 93 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Frank Crenshaw Mayor Town of Pendleton Ed Sokol Mayor Town of Starr As drafts of the Updated Plan were prepared, the Anderson and Oconee County (HMPC) used email and website to distribute them to Stakeholders, and requested that they provide comments. The Stakeholders were requested to provide feedback through email, telep hone or contact POC, James McAdams or a member of the (HMPC). In addition, drafts were e -mailed to neighboring counties for their review and feedback. County, city, and town participation must be defined in order to create a standard for participation in the Natural Hazard Mitigation Plan. This criterion was established so that county and municipal representative’s participation was sufficient to add to and comment on the plan. In order for counties and municipalities to approve the plan and be an official participant of this planning process, they must satisfy one of the following considerations: ♦ The county EMD Director shall be a member of the Natural Hazard Plan Steering Committee and provide input and comments on the plan and the planning process. ♦ The mayor, administrator, or manager shall attend a county or public meeting concerning the Natural Hazard Mitigation Plan and provide input or comments. ♦ The mayor, administrator, or manager shall appoint a city or town employee to attend a county or public meeting concerning the Natural Hazard Mitigation Plan and provide input or comments ♦ A HMPC member shall personally discuss and receive on input or comments on the Natural Hazard Mitigation Plan with a mayor, administrator, manager, or appointed municip al representative. ♦ A mayor, administrator, or manager, shall send input or comments. Municipalities were contacted through emails and phone calls explaining the purpose of the Natural Hazards Mitigation Plan and what was covered at the meetings. Officials were informed through these NAME POSITION DEPARTMENT/AGENCY Blake Sanders Mayor Town of West Pelzer Rockey Burgess Mayor Town of Williamston Lynn Towe Mayor Town of Salem Scott Moulder City Administrator City of Seneca Brandon Burton City Administrator City of Wahalla Linda Oliver Mayor Town of West Union Kevin Bronson City Administrator City of Westminster 13 94 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 emails and phone calls that the Anderson and Oconee County HMPC needed their input and comments for the plan. Each municipality satisfied as least one of the above criteria as they did in the previous plan to be considered an official participant. 2.5 MEETINGS AND WORKSHOPS The preparation of this Plan required a series of meetings and workshops for facilitating discussion, gaining consensus, and initiating data collection efforts with the planning team, local government staff, community officials, and other identified stakeholders. More importantly, the meetings and workshops prompted continuous input and feedback from relevant participants throughout the drafting stages of the Plan. In many cases, routine discussions and additional meetings were held by local staff to accomplish planning tasks specific to their department or agency, such as the approval of specific mitigation actions for their department or agency to undertake and include in the Mitigation Action Plan. Table 2.2 - Meetings & Presentations Concerning the Hazard Mitigation Plan 2.2 - Meetings & Presentations Concerning the Hazard Mitigation Plan Date: Activity: Type: October 4, 2022 Director Hawkins alerted the Anderson County Local Emergency Planning Committee that the 2023 plan updates would be open for public comment in the upcoming months. Public December 6, 2022 James McAdams, ACSO-EMD Planner presented an update on the Hazard Mitigation Plan at the Anderson County Local Emergency Planning Committee Meeting; plan review will start after kick off meeting. Public January 19, 2023 Kickoff meeting conducted at Anderson Emergency Operations Center and Virtual Stakeholders SCEMD Anderson and Oconee County Leadership January 27, 2023 Municipal leaders and stakeholders were invited to the Anderson County Emergency Operations Center to review and discuss the 2023 plan update. Stakeholders January 22, 2023 Website and info update to give public the ability to view meeting dates, log on to website to attend meetings and important info on the Mitigation Plan. Stakeholders/ Public February 1, 2023 First public information meeting Anderson: Agenda Mitigation Plan Update/Review Scope of the Plan Municipal background Description of Planning process Questions/Comments/Next Meeting Stakeholders/ Public 14 95 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Date: Activity: Type: February 8, 2023 Second public information meeting Anderson: Agenda Mitigation Plan Update Hazard Identification Overview types of hazards and locations Questions/Comments/Next Meeting Stakeholders/ Public February 9, 2023 Meeting with Alicia Hunter, Anderson County Director Development Standards/Land Use and Barry Holcombe, Anderson County Director Building Standards/Permits; to discuss NFIP/flood information, building standards other county building ordinances information. Stakeholder/ Subject Matter Expert Wed February 15, 2023 Oconee County HMP Agenda Mitigation Plan Update Overview Mitigation Strategy Overview Mitigation Objectives and Strategies Overview Prioritize mitigation action and projects Questions/Comments/Next Meeting Stakeholders/ Public February 16, 2023 Third public information meeting Anderson Agenda Mitigation Plan Update/Review Scope of the Plan Municipal background Description of Planning process Questions/Comments/Next Meeting Stakeholders/ Public February 22, 2023 Fourth public information meeting Anderson Agenda Mitigation Plan Update Hazard Identification Overview types of hazards and locations Questions/Comments/Next Meeting Stakeholders/ Public Tuesday February 28, 2023 Oconee County HMP Agenda Mitigation Plan Update Hazard Identification Overview types of hazards and locations Questions/Comments/Next Meeting Stakeholders/ Public March 1, 2023 Fifth public information meeting Anderson Agenda Mitigation Plan Update Overview Mitigation Strategy Overview Mitigation Objectives and Strategies Overview Prioritize mitigation action and projects Questions/Comments/Next Meeting Stakeholders/ Public 15 96 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Date: Activity: Type: Thursday March 2, 2023 Oconee County HMP Agenda Mitigation Plan Update Individual Municipal Mitigation Strategy Questions/Comments/Next Meeting Stakeholders/ Public March 7, 2023 Anderson and Oconee County meeting via conference call to discuss any updates to the Mitigation Plan Stakeholders Tuesday March 7, 2023 Oconee County HMP Agenda Mitigation Plan Update Individual Municipal Mitigation Strategy Questions/Comments/Next Meeting Stakeholders/ Public March 8, 2023 Sixth public information meeting Anderson Agenda Mitigation Plan Update Individual Municipal Mitigation Strategy Questions/Comments/Next Meeting Stakeholders/ Public Thursday March 9, 2023 Oconee County HMP Agenda Mitigation Plan Update Plan monitoring and maintenance Schedule for Plan updating Questions/Comments/Next Meeting Stakeholders/ Public March 16, 2023 City of Anderson Municipal Stakeholders and County Emergency Management met at City Fire Station #3 to review and discuss and update municipal mitigation strategies for the 2023 plan update. City of Anderson Stakeholder March 20, 2023 Town of Honea Path Municipal Stakeholders and County Emergency Management met at Town of Honea Path Fire Station to review and discuss and update municipal mitigation strategies for the 2023 plan update. Town of Honea Path Stakeholders March 20, 2023 Town of Pendleton Municipal Stakeholders and County Emergency Management met at County Emergency Management Office to review and discuss and update municipal mitigation strategies for the 2023 plan update. Town of Pendleton Stakeholders March 22, 2023 Town of Pelzer West Pelzer Municipal Stakeholders and County Emergency Management met at County Emergency Management Office to review and discuss and update municipal mitigation strategies for the 2023 plan update. Town of Pelzer West Pelzer Stakeholders March 22, 2023 City of Belton Municipal Stakeholders and County Emergency Management met at City of Belton Fire Station to review and discuss and update municipal mitigation strategies for the 2023 plan update. City of Belton Stakeholders March 27, 2023 County of Anderson Municipal Stakeholders and County Emergency Management met at County Emergency Management Office to review and discuss and update municipal mitigation strategies for the 2023 plan update. County of Anderson Stakeholders April 5th, 2023 Anderson & Oconee Dams Meeting with SC DHEC County Stakeholders 16 97 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 2.6 INVOLVING THE PUBLIC An important component of the mitigation planning process involved public participation. Individual citizen and community -based input provides the entire Planning Team with a greater understanding of local concerns and increases the likelihood of successfully implementing mitigation actions by developing community “buy-in” from those directly affected by the decisions of public officials. As citizens become more involved in decisions that affect their safety, they are more likely to gain a greater appreciation of the hazards present in their community and take the steps necessary to reduce their impact. Public awareness is a key component of any community’s overall mitigation strategy aimed at making a home, neighborhood, school, business, or entire city safer from the potential effects of hazards. Public involvement in the development of the Anderson and Oconee County Multi -Jurisdictional Hazard Mitigation Plan was sought using two methods: (1) public survey instruments were made available in hard copy and online and (2) copies of the draft P lan were made available for public review on county and municipal websites and at government offices. The public was provided two opportunities to be involved in the development of the regional plan at two distinct periods during the planning process: (1) during the drafting stage of the Plan and (2) upon completion of a final draft Plan, but prior to official plan approval and adoption. A public participation survey (discussed in greater detail in Section 2.6.1) was made available during the planning process at various locations including on county and municipal websites. Each of the participating jurisdictions will hold public meetings before the final plan is officially adopted by the local governing bodies. These meetings will occur at different times o nce FEMA has granted conditional approval of the Plan. Adoption resolutions will be included in Appendix A. 2.7 INVOLVING THE STAKEHOLDERS At the beginning of the planning process for the development of this Plan, the project consultant worked with the County Emergency Management lead to initiate outreach to stakeholders to be involved in the planning process. The project consultant sent out a list of recommended stakeholders provided from FEMA Publication 386-1 titled Getting Started: Building Support for Mitigation Planning. The list of recommended stakeholders from FEMA is found in Appendix C of that publication (Worksheet #1: Build the Planning Team) and has been included in Appendix B of this plan to demonstrate the wide range of stakeholders that were considered to participate in the development of this Plan. The County 44 CFR Requirement 44 CFR Part 201.6(b)(1): The planning process shall include an opportunity for the public to comment on the plan during the drafting stage and prior to plan approval. 44 CFR Requirement 44 CFR Part 201.6(b)(2): The planning process shall include an opportunity for neighboring communities, local and regional agencies involved in hazard mitigation activities, and agencies that have the authority to regulate development, as well as businesses, academia, and other non-profit interests to be involved in the planning process. 17 98 SECTION 2: PLANNING PROCESS Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Emergency Management Coordinator used that list for reference as they invited stakeholders to participate in the planning process. In addition to the outreach efforts described above, the Hazard Mitigation Planning Team encouraged more open and widespread participation in the mitigation planning process by designing and distributing the Public Participation Survey . In addition to the public, this survey was provided for local officials, residents, businesses, academia, and other private interests in the county to be involved and offer input throughout the local mitigation planning process. Moreover, the Hazard Mitigation Planning Team pushed to get input from stakeholders outside of the planning area including surrounding counties. Surrounding counties were contacted during the planning process. When the draft Plan was deve loped, the surrounding counties were asked to review the Plan and provide suggestions/comments to the consultant’s project manager. These suggestions and comments were vetted through the Hazard Mitigation Planning Team before they were implemented to ensure that they met the needs of the communities for whom the Plan was developed. Surrounding counties that were contacted included: Laurens County, Cherokee County, Chester County, Union County, York County, and Lancaster County. The email documenting this contact can be found in Appendix D. 2.8 DOCUMENTATION OF PLAN PROGRESS Progress in hazard mitigation planning for the participating jurisdictions in Anderson and Oconee County is documented in this plan update. Since hazard mitigation planning efforts officially began in the county with the development of the initial Hazard Mitigation Plans in the late 1990s and early 2000s, many mitigation actions have been completed and implemented in the participating jurisdictions. These actions have helped to reduce t he overall risk to natural hazards for the people and property in Anderson & Oconee County. The actions that have been completed are documented in the Mitigation Action Plan found in Section 9. In addition, community capability continues t o improve with the implementation of new plans, policies, and programs that help to promote hazard mitigation at the local level. The current state of local capabilities for the participating jurisdictions is captured in Section 7: Capability Assessment . T he participating jurisdictions continue to demonstrate their commitment to hazard mitigation and hazard mitigation planning and have proven this by developing the Hazard Mitigation Planning Team to update the Plan and by continuing to involve the public in the hazard mitigation planning process 18 99 Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 SECTION 3 COMMUNITY PROFILE This section of the Plan provides a general overview of Anderson County, Oconee County, and their participating municipalities. It consists of the following four subsections: ❖ 3.1 Geography and the Environment ❖ 3.2 Historical & Geographical Background of Anderson County Municipalities ❖ 3.3 Historical & Geographical Background of Oconee County Municipalities ❖ 3.4 Population and Demographics ❖ 3.5 Housing, Infrastructure, and Land Use ❖ 3.4 Employment and Industry 3.1 GEOGRAPHY AND THE ENVIRONMENT Within Anderson and Oconee Counties there are 15 municipalities. The overall population of these two counties is 282,325 according to the 2020 US Census Bureau estimates. The region has both rural and urban settings with small towns and larger cities spread throughout the area. Anderson and Seneca, the largest cities have population figures of 29,284 and 8,424, respectively. Many of these small towns do not have full-time staff or employ a professional planner. They rely heavily on each County government and the Council of Governments to provide them with technical assistance for planning functions. Anderson and Oconee County are in the northwest corner of South Carolina. Interstate 85 bisects the region, providing access to many markets in the southeastern United States. Interstate 85 also provides easy access to Charlotte and Atlanta. This is one of the fastest growing regions in the United States. This corridor is characterized by strong economic growth, job creation, and low unemployment. A high quality of life is reflected in lower cost of living standards, affordable home prices, and proximity to many of the recreational amenities people desire, including the mountains and the ocean. The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean is approximately 200 miles to the east. The climate of this area is relatively mild, with an average temperature of 61.6 degrees Fahrenheit (Southeastern Regional Climate Center, 2022). This is slightly lower than other portions of the state such as the Columbia region, which has an average annual temperature of 63.1, a nd the Charleston region with an average annual temperature of 64.8 degrees. Precipitation is relatively constant throughout the year with an average of 4.3 inches of rain per month. The Columbia region averages 4 inches of rain per month while the Charleston region averages 4.2 inches per month. The growing season is from late March to early November and averages 225 days. The region is in an area that has a low natural disaster frequency, with an occasional, ice event, tornado or flood accounting for most events. 19 100 Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 FIGURE 3.1: ANDERSON COUNTY ORIENTATION MAP The geographic location of Anderson County helps to promote various outdoor recreational opportunities for hiking, biking, fishing, and water activities. Historical features also exist throughout the county including battlefields, historic homes, museums, and downtown areas. There are multiple higher education institutions within the county correlating a working partnership between public and private accredited colleges and universities with businesses and the community. 20 101 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 3.2 Historical & Geographical Background of Anderson County Municipalities City of Anderson: The City of Anderson is in the northwest corner of the state of South Carolina on the Piedmont Plateau. It is the county seat located in the geographical center of the county and principal city in Anderson County. The City is ideally located on the busy Interstate 85 corridor, to which much of its economic growth can be attributed. The City lies on the southern border of Interstate 85 and is approximately 127 miles north of Atlanta, Georgia and 132 miles south of Charlotte, North Carolina. The City encompasses approximately 14 square miles and is located in the geographical center of the county. The I-85 corridor from Atlanta to Charlotte is now known as one of the nation’s hottest growth areas. Anderson County, South Carolina lies midway between Atlanta, Georgia and Charlotte, North Carolina. This stretch of highway is one of the heaviest traveled highways in the southeast. Business leaders and development officials in Anderson have taken advantage of this asset, and visible progress is the result. Anderson County was ranked 14t h out of 50 as one of the “Hottest American cities for business location,” (based on a survey of leading site consultants) according to the January 2001 issue of Expansion Management. Anderson is a major contributor to the success of the upstate. Anderson offers all of the basics upon which to build a thriving economy, including affordable land, a good transportation system, infrastructure, and many recreational amenities. In June 2000, Anderson County was one of only ten communities to be designated an All -America City by the National Civic League. The Anderson community offers the feel of small-town living with the attractions and business opportunities of larger cities only a short drive away (City of Anderson, SC, 2022). City of Belton: Belton was charte red in 1855 soon after the Columbia and Greenville Railroad was built. It soon became a junction point of the C & G, the Piedmont and Northern and the Blue Ridge (Southern Railway). With 36 passenger trains serving the town. The city is still served today by two railroads: the Greenville & Western Railway and the Pickens Railway. The city is at the junction of four highway arteries with connections to I-385 in Greenville County, I-26 in Laurens County and I-85 in Anderson and Greenville. Anderson is only 15 minutes away and its only 30 minutes to downtown Greenville. Far enough away for Belton to retain its small -town ambiance and friendliness, but close enough to the big cities for any cultural, educational, work or shopping experience anyone would wish. With a population of 4,400 it is the second largest town in Anderson County. It is unique in having a thriving downtown business district, the historic Town Square, which is undergoing a $1,000,000.00 revitalization. This has been a cooperative effort between the state, the county, the city and local 21 102 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 organizations. In fact, the local organizations have provided most of the work and much of the money. This is indicative of the involvement of the people in the community that makes Belton a great place to live. There are many other successful businesses, as well as many historic sites in the city or area which is located on the S.C. National Heritage Corridor. Historic residential areas are within walking distance of the Town Square. One of these, Brown Ave., particularly reflects small town “Old South” charm and appearance. The symbol for Belton is the Standpipe. This is a 155′ tall, concrete reinforced water tank with a capacity of 165,000 gallons which was built in 1909. It towers over the city and has the appearance of a medieval castle tower. There are only three remaining in SC, and this is the tallest. The city is home to two elementary and one middle school, with the high school being only 10 minutes away. Other cultural and educational facilities are th e Belton Center for the Arts, the Belton Depot, Ruth Drake Museum and a new branch library. Belton has the council form of government with six council members and a mayor. Under this form, the mayor and each council member have the same authority. A city a dministrator is employed to carry out the council’s policies, oversee day to day operations and supervise city employees. The mayor and the council members serve for four-year staggered terms. While council members must reside in the ward they represent, all voters vote for all council members and the mayor. This results in all areas of the town being equally represented, but also ensures that each member of the council is responsive to the needs of all citizens (City of Belton, 2022). Town of Honea Path: A water stop on the Greenville and Columbia Railroad in the 1850s developed into a town whose name origin is uncertain. Honea Path may be misnamed for William Honey, an early landowner and trader, or it may be double -named by Cherokee Indians, with “Honea” being an In dian name for “path” according to folklore. When the town was chartered in 1885, it was referred to as Honey Path in three different places, and early wills and deeds also bear the Honey Path name. However, in 1917 the town was incorporated under the name Honea Path and it has gone by that name ever since. Located on the Anderson -Abbeville county line, Honea Path became a cotton mill town. Chiquola Manufacturing Company commenced operations in 1903 and has remained the economic mainstay. The mill’s early em ployees included future U.S. senator Olin D. Johnston, who went to work as a sweeper in the mill at age eleven. In 1934 Honea Path was the site of one of the most infamous events in American labor history. Chiquola mill hands joined the general strike that swept the upstate that summer, which badly divided the community. On the morning of September 6, later dubbed “Bloody Thursday,” strikers and their supporters gathered to prevent strikebreakers from entering the mill. Fighting broke out, and gunfire erupt ed. In less than five minutes, six strikers were dead and more than a dozen lay wounded. Under military guard, the Chiquola Mill reopened the 22 103 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 following Monday. On Memorial Day 1995, a small granite monument was erected in a Honea Path park to commemorate the tragic event. As the town entered the twenty -first century, the Chiquola Mill continued as Honea Path’s largest employer. However, the town had diversified its economy somewhat. Plants opened nearby that produced synthetic fibers, linens, lady’s spor tswear, shipping containers, and medical equipment. Among the town’s claims to fame is its Carnegie Library, built in 1908. Honea Path is the smallest town in the nation with a Carnegie Library, which remains in use as a branch of the Anderson County Library (The Town of Honea Path, 2022). Town of Iva: The Town of Iva, incorporated in 1904, is located in southern part of Anderson County. Iva, once a shipping station and busy hub for railroad commerce, is a fascinating small -town rich in history and heritage. Iva, SC is located in the southern part of Anderson County and is populated by friendly folks who are proud of their rural heritage and progressive town. Come on over and enjoy the many lakes and rivers that are a part of our area and see why Iva is known as the "Gateway to the Fresh Water Coast." (Town of Iva, 2022). Town of Starr: Starr is located in Anderson County, south of the City of Anderson on SC 81. The town was originally named Twiggs, but when the Savannah Valley Railroad was completed in 1884, the name was changed to Starr Station in honor of a popular engineer who drove the train through town. Anderson is the largest city near Starr (Town of Starr, 2022). Town of Pendleton: Pendleton, SC is a small town in Anderson County, SC. The town was founded in 1790 and is the largest historic area in the entire United States. The town boasts lovely historic homes and plantations, a town square around a village green, and one of the friendliest populations found anywhere! Just four miles from Clemson University, Pendleton offers a combination of History, Education, Friendship and Laughter! (Town of Pendleton, 2022). Town of Pelzer: Pelzer is located in eastern Anderson County on the Saluda River. The town's history is linked with that of Pelzer Manufacturing Company, which began textile production in the late 1880s. The company bought the very first generators made by the General Electric Company and was the first factory in the country to have incandescent lights. Anderson is the largest city near Pelzer. In 2015, Pelzer annexe d commercial business and about 550 houses, raising the population to approximately 600 residents (Independent Mail, 2022). 23 104 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Town of West Pelzer: West Pelzer has a rich history as a healthy place to live, work, and play. We celebrate where we were, where we are currently, and where we are going. West Pelzer is forever being revitalized, rejuvenated, and re-energized through new businesses and growth of our core values and vision. West Pelzer has a population of approximately 969, and is located roughly 30 minutes away from many major cities – including Greenville, Anderson, and Easley – in the heart of upstate South Carolina. As a progressive municipality based on building relationships and community, we strive to be an integral part of both our residents’ lives and Anderson County as a whole. Being situated so closely to interstates 85 and 385 also allows for easy access to many larger key interstates, such as I-20, I-40, and I-26 (Town of West Pelzer, 2022). Town of Williamston: Located in the Foothill s of the Blue Ridge Mountains in the scenic Upstate, Williamston is a thriving area with industrial, commercial, and tourist activity. It is located close to the I -85 business corridor and metropolitan areas. Williamston is 15 minutes from Greenville or An derson, two hours from Atlanta or Charlotte, and four hours to the beach or the mountains. The city’s climate boasts 248 days of sunshine, 49 inches of precipitation, and a comfortable average temperature of 64 degrees (Town of Williamston, 2022). 24 105 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Figure 3.2 Municipality Area Background - Oconee County Map 25 106 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 3.3 Historical & Geographical Background of Oconee County Municipalities Town of Salem: Salem is located in the northeast corner of Oconee County, just off Highway 11, and serves as the gateway to Lakes Jocassee and Keowee (Town of Salem, 2022). City of Seneca: Seneca, a railroad town, was named for a 1700’s Indian village Esseneca located on the banks of the nearby Seneca River. The City, chartered in 1874 as “Seneca City”, dropped “City” from its name in 1906 (City of Seneca, 2022). Nestled in the Foothills of the majestic Blue Ridge Mountains, Seneca is home to residential and co mmercial properties listed on the National Register of Historic Places. Dubbed “The City of Opportunity” at its founding, Seneca still claims its title. With the cool waters of pristine Lake Keowee, Lake Jocassee, and Lake Hartwell nearby, the area offers many recreational opportunities. Favorably positioned between Atlanta, Georgia, and Greenville, South Carolina, just minutes away from Clemson University, Seneca and Oconee County have gained national acclaim for its natural beauty, quaint towns, antique s hopping and as a favorite destination for history buffs and outdoor enthusiast alike (City of Seneca, 2022). City of Walhalla: Walhalla, South Carolina is the county seat of Oconee County in the upstate of South Carolina. Today, Walhalla is a southern town with historical homes, churches, and the Walhalla Civic Auditorium where regional and local theater events are held. Walhalla is located just minutes away from the wide variety of activities Oconee County and the surrounding areas have to offer, including an abundance of hiking and mountain biking trails, numerous waterfalls, Stumphouse Tunnel, the Chattooga River, the Blue Ridge Mountains, Clemson University, and more (City of Walhalla, 2022). Town of West Union: Located between Seneca and Walhalla, people are attracted to West Union for its shoreline on Keowee Key (West Union, 2022). City of Westminster: The City of Westminster is a small town in Oconee County along the foothills of the Blue Ridge Mountains. It's full of charm with quaint shops along its historic Main Street. Our residents enjoy a leisurely paced lifestyle, and a wide variety of occupational and recreational opportunities. Westminster is a great place to visit, but it’s even a nicer place to live and work. With award winning schools, a small-town feel, and a progressive plan for continued renewal, it offers families and retirees a perfect place to call home (City of Westminster, 2022). 26 107 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Climate The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean is approximately 200 miles to the east. The climate of this area is relatively mild, with an average temperature of 61.6 degrees Fahrenheit (Southeastern Regional Climate Center, 2022). This is slightly lower than other portions of the state such as the Columbia region, which has an average annual temperature of 63.1, and the Charleston region with an average annual temperature of 64.8 degrees. Precipitation is relatively constant throughout the year with an average of 4.3 inches of rain per month. The Columbia region averages 4 inches of rain per month while the Charleston region averages 4.2 inches per month. The growing season is from late March to early Nov ember and averages 225 days. The region is in an area that has a low natural disaster frequency, with an occasional, ice event, tornado or flood accounting for most events. 3.4 POPULATION AND DEMOGRAPHIC Area Population, Households, Median Incomes by County. The following tables show the population, households and median household income for the two - county region and their municipalities. Additional detailed census information is identified in the Social Vulnerability section. Table 3.1: Population by County. County Population Population 65+ (%) Households Median Household Income Anderson 203,718 18.4% 78,636 $53,598 Oconee 78,607 24.1% 32,440 $49,691 United States Census Bureau, 2020. 27 108 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Table 3.2 - Population by Municipality County Municipality Population Anderson County City of Anderson 29,284 City of Belton 4,436 Town of Honea Path 3,753 Town of Iva 1,177 Town of Starr 149 Town of Pendleton 3,245 Town of Pelzer 1,653 Town of West Pelzer 1,049 Town of Williamston 4,219 Oconee County Town of Salem 175 City of Seneca 8,424 City of Walhalla 4,377 Town of West Union 319 City of Westminster 2,543 United States Census Bureau, 2020. Table 3.3 County Demographics. Anderson County Oconee County Total Population: 203,718 79,203 Race: White 163,178 (80.1%) 70,570 (89.1%) Black/African American 33,206 (16.3%) 6,019 (7.6%) Hispanic/Latino 8,964 (4.4%) 4,673 (5.9%) American Indian and Alaska Native 815 (0.4%) 317 (0.4%) Asian 2,445 (1.2%) 713 (0.9%) Two or More Races 4,074 (2.0%) 1,584 (2.0%) Civilian Labor Force (ages 16+, %): 60.2% 54.5% Employed* 86,686 32,885 Unemployed* 3,343 1,238 Unemployment Rate (%)* 3.7% 3.6% 28 109 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Median Household Income: $53,598 $49,691 Persons in Poverty (%): 14.0% 11.1% Households: 78,636 32,440 Persons over 65 (%): 18.4% 24.1% United States Census Bureau, 2020. Table 3.4 County Employment Information Anderson County Oconee County Year Employed Unemployed Unemployment Rate Employed Unemployed Unemployment Rate 2021 86,686 3,343 3.7% 32,885 1,238 3.6% 2020 83,340 5,100 5.8% 32,421 1,770 5.2% 2019 86,575 2,360 2.7% 33,208 933 2.7% 2018 85,287 2,807 3.2% 32,769 1,123 3.3% 2017 84,199 3,377 3.9% 31,937 1,436 4.3% 2022 South Carolina Department of Employment and Workforce, Community Profile 3.5 Housing, Infrastructure, and Land Use Transportation Anderson and Oconee are in the northwest corner of South Carolina. Interstate 85 bisects the region, providing access to many markets in the southeastern United States. Interstate 85 also provides easy access to Charlotte and Atlanta. This is one of the fa stest growing regions in the United States. This corridor is characterized by strong economic growth, job creation, and low unemployment. A high quality of life is reflected in lower cost of living standards, affordable home prices, and proximity to many o f the recreational amenities people desire, including the mountains and the ocean. There are several major highways that travel through Anderson and Oconee County including US Highways 29, 76, and 11 US Highway 29 cuts across the eastern - portion of Anderso n county from south to northeast while US Highway 76 runs south to northwest, and the two intersect in the City of Anderson. US Highway 11 travels from southwest to northeast in Oconee county. Anderson and Oconee county both have small cargo airports. Both airports services local and private aircrafts along with general aviation airports. Flight instruction is also available at the airport. Rail service in Anderson and Oconee county is provided by CSX Transportation and Norfolk Southern Corporation which op erate the first and second longest track routes in the state, respectively. . Bus transportation service is provided along multiple routes throughout the city and adjacent areas. The Anderson Area Regional Transit Agency offers public bus service throughout the City of Anderson. Utilities 29 110 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Electrical power in Anderson County is provided by Duke Energy, Blue Ridge Electric Cooperative, and Laurens Electric Cooperative. Oconee County is provided electrical power by Duke Energy, Blue Ridge Electric Coop erative, Gibson Electric and Hart Electric Membership Corporation. Anderson Regional Joint Water System (ARJWS), is a partnership of rural and municipal water districts devoted to providing a high -quality, clean, safe, reliable, economical flow of treat ed water to its wholesale customers in Anderson and Pickens counties. Anderson Regional Joint Water System provides water to eighteen water systems throughout Anderson County. There are four Utility Companies in Oconee County, South Carolina, serving a pop ulation of 75,926 people in an area of 627 square miles. The four companies are Blue Ridge Electric Cooperative, Keowee Key Utility System, Pioneer Rural Water District and Salem Water Department. There is 1 Utilities per 18,981 people, and 1 Utilities per 156 square miles. In South Carolina, Oconee County is ranked 22nd of 46 counties in Utility Companies per capita, and 20th of 46 counties in Utility Companies per square mile. Community Facilities There are a number of public buildings and community facilities located throughout Anderson County. According to the data collected for the vulnerability assessment (Section 6.3.3), there are 52 schools, 36 fire stations, 9 law enforcement stations, 1 hosp ital, and 1 Emergency Operations Center within Anderson county. The Anderson hospital is the AnMed Health Medical Center a 461 -bed acute care hospital located at 800 N. Fant St. in Anderson, South Carolina. The Medical Center is the anchor facility for AnMed Health, South Carolina's largest independent, not -for-profit health system. AnMed has an emergency department, an intensive care unit, geriatric psychiatric services, a joint care program, cardiology services, inpatient rehabilitation, and a sleep cen ter. Other services provided include open heart surgery, vascular surgery, general surgery, bariatric surgery, emergency/trauma medicine, a stroke/neurological center, and diagnostic MRI, CT and laboratory medicine. Other facilities located at AnMed Health's medical center campus include Pediatric Therapy Works, a speech, occupational and physical therapy program for children; and CareConnect, a walk -in facility that treats non -life-threatening ailments such as influenza, broken bones and minor nosebleeds. AnMed operates additional medical facilities throughout the county. The county also currently operates five school districts. Higher education programs are also available from institutions including Anderson University and Tri County Technical College. Anderson County Public Library system operates nine library branches throughout the county and a Bookmobile. Anderson Parks and Recreation System maintains numerous community and regional parks throughout the county. There are also additional federal recreational facilities located along lake Hartwell. Anderson County offers a variety of recreational activities throughout the county. There are many parks that offer biking, hiking, fishing, boating, picnicking, camping, 30 111 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 playgrounds, and outdoor concerts. Va rious lakes provide outdoor opportunities for boating, fishing, picnicking, and canoe/kayaking. Boat ramps and pontoon sites are available at certain park and lake locations in the county. such as ball parks, playing fields, community centers, recreation c enters, trails/greenways, lake access. The famous “Bass Masters Classic” fishing tournament is held on Lake Hartwell in Anderson County. Oconee county also has a number of public buildings and community facilities located throughout the County. According to the data collected for the vulnerability assessment (Section 6.3.3), there are 22 schools, 13 fire stations, 6 law enforcement stations, 1 hospital, and 1 Emergency Operations Center within Oconee county. Oconee County has one hospital facility. Prisma Health Oconee Memorial Hospital has been caring for the residents of the greater Oconee County community since 1939. Oconee Memorial Hospital consists of a 169-bed hospital featuring a range of inpatient and outpatient services and a host of community -based services. There are additional medical facilities located throughout each county’s municipalities. The Oconee County Emergency Services Fire Division is comprised of thirteen all volunteer fire departments, three municipal fire departments, and one s pecial tax district fire department. Together these fire departments are home to more than 450 volunteer firefighters. These volunteers are supported by a workforce known as Station 21. Station 21 consists of both full - time personnel and part-time personnel. The full-time personnel include Command level staff, Administrative personnel, and Suppression personnel. The part -time staff assists with the day - to-day operations of each department. These personnel help to ensure that each department is always prepared to respond to your emergency should the need ever arise. Oconee County Public Library operates four branch libraries (Walhalla, Westminster, Seneca and Salem, throughout the county and a Bookmobile. Oconee Parks and Recreation System maintains numerous community and regional parks throughout the county. There are also additional federal recreational facilities located along Lake Hartwell. Land Use Land use and development patterns in Anderson and Oconee County are the result of a complex interaction of demographic trends, economic circumstances, and social attitudes. Technological changes in areas such as transportation and construction, as well as the availability and cost of natural resources, including land, water, and ene rgy, have also helped shape existing development patterns. The forces that influence land development are constantly evolving. Consequently, factors impacting forms of land use are dramatically different today from those that shaped land use patterns in t he past. Lifestyle preferences, size and configuration of households, levels of personal income, available transportation modes, and the composition of the economy are a few of the variables responsible for the current geographic distribution of land use and activities. As both counties grow and continue to develop, more and more land is changing from farmland and woodland to residential, commercial, and industrial use; supported by more roads, schools, churches, and other public and semi -public uses. Local land use and associated regulations are 31 112 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 further discussed in Section 7: Capability Assessment. 3.4 EMPLOYMENT AND INDUSTRY Agriculture was the original mainstay of Anderson and Oconee County’s economy, but industrial development started with the start of textile mills in the early 1800s which led to the growth of the textile industry. As traditional textiles began their decline in the mid -1900s, the county’s industrial base broadened, eventually making it one of the most internationally diverse locations for business in the nation. The manufacturing industry in Anderson and Oconee region has grown to include automotive manufacturing suppliers, plastics, packaging, metalworking, and distribution. Today, Anderson and Oconee County have a diverse economy with large industrial companies including international companies. Milliken, Michelin North America, Bosh, Electrolux Major Appliances North America, First Quality Tissue SE, LLC,; Glen Raven, Inc; a ll operate within Anderson and Oconee county bringing jobs and economic revenue to the area. Localized employers also operate within the county and provide numerous jobs to residents. AnMed hospital system is also a major employer within the county as along with county school system. Economic growth is occurring within both counties and is projected to continue from an economic and population perspective. References 32 113 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 City of Anderson. (2022, March 1). About. Retrieved from City of Anderson Website: http://www.cityofandersonsc.com/ City of Belton. (2022, March 1). History. Retrieved from City of Belton Website: https://cityofbeltonsc.com/public-buisnesses/ City of Seneca. (2022, March 1). About Seneca. Retrieved from City of Seneca Website: http://www.seneca.sc.us/AboutSeneca.aspx City of Starr. (2022, March 1). Starr, South Carolina. Retrieved from SciWay Website: https://www.sciway.net/city/starr.html City of Walhalla. (2022, March 1). History of Walhalla. Retrieved from City of Walhalla Website: https://www.cityofwalhalla.com/about-walhalla/history-of-walhalla/ City of Westminster. (2022, March 1). Home. Retrieved from City of Westminster Website: https://westminstersc.org/ The Independent Mail . (2022, March 1). Pelzer Town Council Approves Annexation. Retrieved from The Independent Mail Website : http://archive.independentmail.com/news/local/pelzer-town-council- approves-annexation-ep-1195216106-347554681.html Town of Honea Path. (2022, March 1). History. Retrieved from Town of Honea Path Website: https://honeapathsc.com/history/ Town of Iva. (2022, March 1). Town of Iva. Retrieved from GoverMeta Website: https://www.govermeta.com/US/Iva/161055104032679/Town-of-Iva Town of Pendleton. (2022, March 1). History. Retrieved from Town of Pendleton Website: https://townofpendleton.org/history/ Town of Salem. (2022, March 1). Home. Retrieved from Town of Salem Website: http://salemsc.us/ Town of West Pelzer. (2022, March 1). About Us. Retrieved from Town of West Pelzer Website: https://westpelzer.com/index.php/about-us/ Town of West Union. (2022, March 1). West Union. Retrieved from Visit Oconee Website: https://visitoconeesc.com/visit/west-union/ Town of Williamston. (2022, March 1). About Williamston, SC. Retrieved from Town of Williamston: http://www.williamstonsc.us/about/ United States Census Bureau. (2022, February 14). Anderson County, South Carolina. 33 114 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 https://www.census.gov/quickfacts/fact/table/andersoncountysouthcarolina/BZA115219 United States Census Bureau. (2022, February 14). Oconee County, South Carolina. https://www.census.gov/quickfacts/fact/table/oconeecountysouthcarolina/AGE775219#AGE7752 19 Western Regional Climate Center. (2022, March 1). Average of Average Temperature. Retrieved from The Western Regional Climate Center Website: http://www.wrcc.dri.edu/cgi-bin/cliMAIN.pl?sc0170 Western Regional Climate Center. (2022, March 1). Total of Precipitation. Retrieved from The Western Regional Climate Center Website: http://www.wrcc.dri.edu/cgi-bin/cliMAIN.pl?sc0170 34 115 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 SECTION 4 HAZARD IDENTIFICATION This section describes how the Planning Team identified the hazards to be included in the Plan. It consists of the following five subsections: ❖ 4.1 Overview ❖ 4.2 Description of Full Range of Hazards ❖ 4.3 Disaster Declarations ❖ 4.4 Hazard Evaluation ❖ 4.5 Hazard Identification Results IFR §201.6(c)(2): The plan shall include a risk assessment that provides the factual basis for activities proposed in the strategy to reduce losses from identified hazards. Local risk assessments must provide sufficient information to enable the jurisdiction to identify and prioritize appropriate mitigation actions to reduce losses from identified hazards. IFR §201.6(c)(2)(ii): [The risk assessment shall include a] description of the jurisdiction’s vulnerability to the hazards described in paragraph (c)(2)(i) of this section. This description shall include an overall summary of each hazard and its impact on the community. OVERVIEW Anderson and Oconee Counties are vulnerable to a wide range of natural and human -caused hazards that threaten life and p roperty. Current FEMA regulations and guidance under the Disaster Mitigation Act of 2000 (DMA 2000) require, at a minimum, an evaluation of a full range of natural hazards. An evaluation of man-made hazards (i.e., technological hazards, terrorism, etc.) is encouraged, though not required, for plan approval. Note that eliminating man -made hazards does not suggest that those type hazards are not of concern to the Counties, only that they are not natural hazards, and therefore the HMPC determined that they wou ld not be included in the Plan update. Anderson and Oconee County has included an assessment of primarily natural hazards, but some man -made hazards have also been identified. Some parts of the original Plan were preserved. Where applicable, portions of t he historical hazard data have been retained. As part of the update process, the HMPC reviewed the hazards section of the previous plans, and incorporated changes related to recent hazard events that have affected the Counties. 35 116 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Upon a review of the full range of natural hazards suggested under FEMA planning guidance, Anderson and Oconee County and their fourteen participating municipalities have identified several hazards that are to be addressed in their Multi -Jurisdictional Hazard Mitigation Plan. These hazards were identified through an extensive process that utilized input from the Anderson Oconee County Hazard Mitigation Planning Team members, research of past disaster declarations in the county, 1 and review of the South Carolina State Hazard Mit igation Plan. Readily available information from reputable sources (such as federal and state agencies) was also evaluated to supplement information from these key sources. Additionally, Hazards which were analyzed and not included in the plan; yet Anderson and Oconee counties often experience aftereffects such as high winds, increased rainfall and possible increase flooding, which are addressed in the plan; yet these hazards are not a di rect threat to Anderson and Oconee county yet were analyzed and not included in the plan and they are: T ropical cyclone, tropical depression, tropical storm and major hurricane: A Tropical cyclone is a rotating, organized system of clouds and thunderstorm s that originates over tropical or subtropical waters and has a closed low -level circulation. Tropical cyclones rotate counterclockwise in the Northern Hemisphere. They are classified as follows: • Tropical Depression: A tropical cyclone with maximum sustained winds of 38 mph (33 knots) or less. • Tropical Storm: A tropical cyclone with maximum sustained winds of 39 to 73 mph (34 to 63 knots). • Hurricane: A tropical cyclone with maximum sustained winds of 74 mph (64 knots) or higher. In the western North Pacific , hurricanes are called typhoons; similar storms in the Indian Ocean and South Pacific Ocean are called cyclones. • Major Hurricane: A tropical cyclone with maximum sustained winds of 111 mph (96 knots) or higher, corresponding to a Category 3, 4 or 5 on the Saffir-Simpson Hurricane Wind Scale. Tropical cyclones forming between 5- and 30 -degrees North latitude typically move toward the west. Sometimes the winds in the middle and upper levels of the atmosphere change and steer the cyclone toward the north and northwest. When tropical cyclones reach latitudes near 30 degrees North, they often move northeast. After a thorough review and analysis, it was determined that Anderson and Oconee counties were not subject to any unique natural hazards. Anderson and Oconee County are located in the northwest corner of South Carolina. The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean is approximately 200 miles to the east. Therefore, Tropical cyclone, t ropical depression, tropical storm and major hurricane do not pose a direct threat to Anderson and Oconee county. Anderson and Oconee counties also addressed climate change and its effects on both counties (see Annex C). Climate change is generally defined as a significant variation of average weather conditions; conditions becoming warmer, wetter, or drier over several decades or more. It’s the longer-term trend that differentiates climate change from natural weather variability. Changes in the probability of future hazard events may include changes in location, increases or decreases to the impacts, and/or extent of known natural hazards, such as floods or droughts. Changes in temperature, intensity, hazard distribution, and/or frequency of weather events may increase vulnerability to these hazards in the future. FEMA’s Climate Change Adaptation Policy (2011 - OPPA-01) directs FEMA programs and policies to integrate considerations of climate change adaptation. The challenges posed by climate change, such as more intense storms, frequent heavy precipitation, heat waves, drought, extreme flooding, and higher sea levels, could significantly alter the types and magnitudes of hazards impacting states in the future. Due to the inherent uncertainties with projections of future hazard events, states 36 117 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 are expected to look across the whole community of partners (for example, publ ic, private, academic, non - governmental, etc.) to identify the most relevant data and select the most appropriate methodologies to assess risks and vulnerability. Anderson and Oconee County are located in the northwest corner of South Carolina. The Appalachian and Blue Ridge Mountains border the region to the northwest and the Atlantic Ocean is approximately 200 miles to the east. In comparison to the rest of South Carolina the climate of the upstate area is relatively mild; yet Anderson and Oconee are not immune from the effects of climate change. , Table 4.1 lists the full range of hazards initially identified for inclusion in the Plan and provides a brief description for each. This table includes 24 individual hazards. Some of these hazards are considered to be interrelated or cascading, but for preliminary hazard identification purposes, these individual hazards are broken out separately. Next, Table 4.2 lists the disaster declarations in Anderson and Oconee County. Next, Table 4.3 documents the evaluation process used for determining which of the initially identified hazards are considered significant enough to warrant further evaluation in the risk assessment. For each hazard considered, the table indicates whether or not the hazard was ident ified as a significant hazard to be further assessed, how this determination was made, and why this determination was made. The table works to summarize not only those hazards that were identified (and why) but also those that were not identified (and why not). Hazard events not included at this time may be addressed during future evaluations and updates of the risk assessment if deemed necessary by the Hazard Mitigation Planning Team during the plan update process. Lastly, Table 4.4 provides a summary of the hazard identification and evaluation process noting that - 9- of the 24 initially identified hazards are considered significant enough for further evaluation through this Plan’s risk assessment (marked with a “ ”). 37 118 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 DESCRIPTION OF FULL RANGE OF HAZARDS TABLE 4.1: DESCRIPTIONS OF THE FULL RANGE OF INITIALLY IDENTIFIED HAZARDS Hazard Description ATMOSPHERIC HAZARDS Avalanche A rapid fall or slide of a large mass of snow down a mountainside. Drought / Heat Wave A prolonged period of less than normal precipitation such that the lack of water causes a serious hydrologic imbalance. Common effects of drought include crop failure, water supply shortages, and fish and wildlife mortality. High temperatures, high winds, and low humidity can worsen drought conditions and also make areas more susceptible to wildfire. Human demands and actions have the ability to hasten or mitigate drought-related impacts on local communities. Extreme Cold Extreme cold is generally considered to occur when the temperature is at or below freezing for a period of time. Often these events are associated with winter storms and other winter weather, but extreme cold events can occur on their own. Dangers associated with extreme cold events include frostbite and hypothermia among other impacts to people and these events can often last for several days or weeks in a row. Hailstorm / Thunderstorms Any storm that produces hailstones that fall to the ground; usually used when the amount or siz e of the hail is considered significant. Hail is formed when updrafts in thunderstorms carry raindrops into parts of the atmosphere where the temperatures are below freezing. Heat Wave/Extreme Heat A heat wave may occur when temperatures hover 10 degrees or more above the average high temperature for the region and last for several weeks. Humid or muggy conditions, which add to the discomfort of high temperatures, occur when a “dome” of high atmospheric pressure traps hazy, damp air near the ground. Excess ively dry and hot conditions can provoke dust storms and low visibility. A heat wave combined with a drought can be very dangerous and have severe economic consequences on a community. 38 119 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Hurricane/Tropical Storm Hurricanes and tropical storms are classified as cyclones and defined as any closed circulation developing around a low -pressure center in which the winds rotate counter-clockwise in the Northern Hemisphere (or clockwise in the Southern Hemisphere) and with a diameter averaging 10 to 30 mil es across. When maximum sustained winds reach or exceed 39 miles per hour, the system is designated a tropical storm, given a name, and is closely monitored by the National Hurricane Center. When sustained winds reach or exceed 74 miles per hour the storm is deemed a hurricane. The primary damaging forces associated with these storms are high -level sustained winds, heavy precipitation, and tornadoes. Coastal areas are also vulnerable to the additional forces of storm surge, wind -driven waves, and tidal flooding which can be more destructive than cyclone wind. The majority of hurricanes and tropical storms form in the Atlantic Ocean, Caribbean Sea, and Gulf of Mexico during the official Atlantic hurricane season, which extends from June through November. Lightning Severe Storms / Thunderstorms Lightning is a discharge of electrical energy resulting from the buildup of positive and negative charges within a thunderstorm, creating a “bolt” when the buildup of charges becomes strong enough. This flash of light usually occurs within the clouds or between the clouds and the ground. A bolt of lightning can reach temperatures approaching 50,000 degrees Fahrenheit. Lightning rapidly heats the sky as it flashes, but the surrounding air cools following the bolt. This ra pid heating and cooling of the surrounding air causes thunder. On average, 73 people are killed each year by lightning strikes in the United States. Nor’easter Similar to hurricanes, nor’easters are ocean storms capable of causing substantial damage to coastal areas in the Eastern United States due to their associated strong winds and heavy surf. Nor'easters are named for the winds that blow in from the northeast and drive the storm up the East Coast along the Gulf Stream, a band of warm water that lies off the Atlantic coast. They are caused by the interaction of the jet stream with horizontal temperature gradients and generally occur during the fall and winter months when moisture and cold air are plentiful. Nor’easters are known for dumping heavy amoun ts of rain and snow, producing hurricane-force winds, and creating high surf that causes severe beach erosion and coastal flooding. Severe Thunderstorm/ High Wind Thunderstorms are caused by air masses of varying temperatures meeting in the atmosphere. Rapidly rising warm moist air fuels, the formation of thunderstorms. Thunderstorms may occur singularly, in lines, or in clusters. They can move through an area very quickly or linger for several hours. Thunderstorms may result in hail, tornadoes, or straight-line winds. Windstorms pose a threat to lives, property, and vital utilities primarily due to the effects of flying debris that can down trees and power lines. 39 120 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Tornado / High Winds A tornado is a violently rotating column of air that has contact with the ground and is often visible as a funnel cloud. Its vortex rotates cyclonically with wind speeds ranging from as low as 40 mph to as high as 300 mph. Tornadoes are most often generated by thunderstorm activity when cool, dry air intersects and overrides a layer of warm, moist air forcing the warm air to rise rapidly. The destruction caused by tornadoes ranges from light to catastrophic depending on the intensity, size, and duration of the storm. Winter Storm Winter storms may include snow, sleet, freezing rain, or a mix of these wintry forms of precipitation. Blizzards, the most dangerous of all winter storms, combine low temperatures, heavy snowfall, and winds of at least 35 miles per hour, reducing visibility to only a few yards. Ice storms occur when moisture falls and freezes immediately upon impact on trees, power lines, communication towers, structures, roads, and other hard surfaces. Winter storms and ice storms can down trees, cause widespread power outages, damage property, and cause fatalities and injuries to human life. GEOLOGIC HAZARDS Expansive Soils Soils that will exhibit some degree of volume change with variations in moisture conditions. The most important properties affecting degree of volume change in a soil are clay mineralogy and the aqueous environment. Expansive soils will exhibit expansion caused by the intake of water and, conversely, will exhibit contraction when moisture is removed by drying. Generally speaking, they often appear sticky when wet and are characterized by s urface cracks when dry. Expansive soils become a problem when structures are built upon them without taking proper design precautions into account with regard to soil type. Cracking in walls and floors can be minor or can be severe enough for the home to be structurally unsafe. Earthquake A sudden, rapid shaking of the Earth caused by the breaking and shifting of rock beneath the surface. This movement forces the gradual building and accumulation of energy. Eventually, strain becomes so great that the energy is abruptly released, causing the shaking at the earth’s surface which we know as an earthquake. Roughly 90 percent of all earthquakes occur at the boundaries where tectonic plates meet, although it is possible for earthquakes to occur entirely with in plates. Earthquakes can affect hundreds of thousands of square miles, cause damage to property measured in the tens of billions of dollars, result in loss of life and injury to hundreds of thousands of persons and disrupt the social and economic functioning of the affected area. Landslide The movements of a mass of rock, debris, or earth down a slope when the force of gravity pulling down the slope exceeds the strength of the earth materials that comprise to hold it in place. Slopes greater than 10 degrees are more likely to slide, as are slopes where the height from the top of the slope to its toe is greater than 40 feet. Slopes are also more likely to fail if vegetative cover is low and/or soil water content 40 121 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 is high. Land Subsidence/Sinkhole The gradual settling or sudden sinking of the Earth’s surface due to the subsurface movement of earth materials. Causes of land subsidence include groundwater pump age, aquifer system compaction, drainage of organic soils, underground mining, hydro compaction, natural compaction, sinkholes, and thawing permafrost. Tsunami A series of waves generated by an undersea disturbance such as an earthquake. The speed of a tsunami traveling away from its source can range from up to 500 miles per hour in deep water to approximately 20 to 30 miles per hour in shallower areas near coastlines. Tsunamis differ from regular ocean waves in that their currents travel from the water surface all the way down to the sea floor. Wave amplitudes in deep water are typically less than one meter; they are often barely detectable to the human eye. However, as they approach shore, they slow in shallower water, essentially causing the waves from behind to effectively “pile up,” and wave heights increase dramatically. As opposed to typical waves which crash at the shoreline, tsunamis bring with them a continuously flowing ‘wall of water’ with the potential to cause devastating damage in coastal areas located immediately along the shore. Volcano A mountain that opens downward to a reservoir of molten rock below the surface of the earth. While most mountains are created by forces pushing up the earth from below, volcanoes are different in that they are built up over time by an accumulation of their own eruptive products: lava, ash flows, and airborne ash and dust. Volcanoes erupt when pressure from gases and the molten rock beneath becomes strong enough to cause an explosion. HYDROLOGIC HAZARDS Erosion Erosion is the gradual breakdown and movement of land due to both physical and chemical processes of water, wind, and general meteorological conditions. Natural, or geologic, erosion has occurred since the Earth’s formation and continues at a very slow and uniform rate each year. Dam and Levee Failure Dam failure is the collapse, breach, or other failure of a dam structure resulting in downstream flooding. In the event of a dam failure, the energy of the water stored behind even a small dam is capable of causing loss of life and severe property damage if development exists downstream of the d am. Dam failure can result from natural events, human -induced events, or a combination of the two. The most common cause of dam failure is prolonged rainfall that produces flooding. Failures due to other natural events such as hurricanes, earthquakes, or l andslides are significant because there is generally little or no advance warning. 41 122 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Floods The accumulation of water within a water body which results in the overflow of excess water onto adjacent lands, usually floodplains. The floodplain is the land adjoining the channel of a river, stream, ocean, lake, or other watercourse or water body that is susceptible to flooding. Most floods fall into the following three categories: riverine flooding, coastal flooding, or shallow flooding (where shallow floodin g refers to sheet flow, ponding, and urban drainage). Storm Surge A storm surge is a large dome of water often 50 to 100 miles wide and rising anywhere from four to five feet in a Category 1 hurricane up to more than 30 feet in a Category 5 storm. Storm surge heights and associated waves are also dependent upon the shape of the offshore continental shelf (narrow or wide) and the depth of the ocean bottom (bathymetry). A narrow shelf, or one that drops steeply from the shoreline and subsequently produces deep water close to the shoreline, tends to produce a lower surge but higher and more powerful storm waves. Storm surge arrives ahead of a storm’s actual landfall and the more intense the hurricane is, the sooner the surge arrives. Storm surge can be devastating to coastal regions, causing severe beach erosion and property damage along the immediate coast. Further, water rise caused by storm surge can be very rapid, posing a serious threat to those who have not yet evacuated flood-prone areas. OTHER HAZARDS Wildfire An uncontrolled wildfire burning in an area of vegetative fuels such as grasslands, brush, or woodlands. Heavier fuels with high continuity, steep slopes, high temperatures, low humidity, low rainfall, and high winds all work to increase risk for people and property located within wildfire hazard areas or along the urban/wildland interface. Wildfires are part of the natural management of forest ecosystems, but most are caused by human factors. Over 80 percent of forest fires are started by negligent human behavior such as smoking in wooded areas or improperly extinguishing campfires. The second most common cause for wildfire is lightning. Hazardous Materials Incident Hazardous material (HAZMAT) incidents can apply to fixed facilities as well as mobile, transportation-related accidents in the air, by rail, on the nation’s highways and on the water. HAZMAT incidents consist of solid, liquid and/or gaseous contaminants that are released from fixed or mobile containers, whether by accident or by des ign as with an intentional terrorist attack. A HAZMAT incident can last hours to days, while some chemicals can be corrosive or otherwise damaging over longer periods of time. In addition to the primary release, explosions and/or fires can result from a re lease, and contaminants can be extended beyond the initial area by persons, vehicles, water, wind and possibly wildlife as well. Transportation Incident Transportation incidents come in many forms in the United States, especially given the many forms of transportation available today. The most common types of transportation incidents are motor vehicle 42 123 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 accidents, but plane, train, and watercraft accidents occur as well and often have higher magnitude impacts. DISASTER DECLARATIONS Disaster declarations provide initial insight into the hazards that may impact Anderson and Oconee County planning area. Since 1990, eight presidential disaster declarations have been reported in Anderson and Oconee County. This includes three events related to severe storms and flooding, one severe winter weather events, one hurricane, one tropical storm, one wild fire and one pandemic. However, this list is not inclusive of many of the major disaster events that impacted the counties and which may have resulted in Small Business Administration disaster loan assistance or no federal assistance. TABLE 4.2: ANDERSON / OCONEE COUNTY DISASTER DECLARATIONS YEAR DATE DISASTER 2004 10/7 Tropical Storm Frances DR-1509 2004 2/13 Ice storm DR-1566 2015 10/5 Severe Storms and Flooding DR-4241 2016 11/12 South Carolina Pinnacle Mountain Fire (Pickens County) FM-5162 2017 10/16 Hurricane Irma DR-4346 2020 3/17 Severe storms, Tornadoes, Straight-line Winds, and Flooding DR-4479 2020 3/27 Covid-19 DR-4492 2020 5/1 Severe storms, Tornadoes, Straight-line Winds, and Flooding DR-4542 Source: www.fema.gov HAZARD EVALUATION 43 124 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 TABLE 4.3: DOCUMENTATION OF THE HAZARD EVALUATION PROCESS Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? ATMOSPHERIC HAZARDS Avalanche NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan Review of US Forest Service National Avalanche Center website (https://avalanche.org) The United States avalanche hazard is limited to mountainous western states including Alaska as well as some areas of low risk in New England. Avalanche was not included in the SC State Hazard Mitigation Plan. Avalanche was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. There is no risk of avalanche events in South Carolina. 44 125 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Drought / Heat Wave YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan Review of US Drought Monitor website Drought is a normal part of virtually all climatic regimes, including areas with high and low average rainfall. The SC State Hazard Mitigation Plan found the entire state to be vulnerable to drought, and all buildings and facilities are considered to be equally exposed to this hazard. Drought was included in the previous Anderson/Oconee County Hazard Mitigation Plan. There are reports of moderate to exceptional drought conditions in Anderson/Oconee County according to the US Drought Monitor. Extreme Cold NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan Review of NOAA NCEI Storm Events Database Because South Carolina is located in the southeastern United States, it rarely experiences extreme cold events that are on par with other locations in the country. Extreme cold was not included in the SC State Hazard Mitigation Plan. Extreme cold was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. 45 126 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Hailstorm / Thunderstorm YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan Review of NOAA NCEI Storm Events Database Although hailstorms occur primarily in the Midwestern states, they do occur in every state on the mainland U.S. Most inland regions experience hailstorms at least two or more days each year. Hail is discussed in the SC State Hazard Mitigation Plan, and due to its unpredictability, all buildings and facilities are considered to be equally exposed to this hazard. According to the state plan, the historical annualized losses from hail from 1960-2020 are $216, 221 for Anderson and $1,828,285 for Oconee County. Hail was included in the previous Anderson/Oconee County Hazard Mitigation Plan. Heat Wave/Extreme Heat No Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database. Many areas of the United States are susceptible to heat waves, including South Carolina. The SC State Hazard Mitigation Plan identifies extreme heat as a hazard with the potential to affect the state. Extreme heat / Heat Wave was included in the previous Anderson/Oconee County Hazard Mitigation Plan. 1 A complete list of disaster declarations for Anderson and Oconee County can be found above in Table 4.2. 46 127 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Hurricane/Trop. Storm YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Analysis of NOAA historical tropical cyclone tracks and National Hurricane Center Website. Review of NOAA NCEI Storm Events Database Review of historical presidential disaster declarations. The Atlantic and Gulf regions are most prone to landfall by hurricanes and tropical storms. The SC State Hazard Mitigation Plan found the entire state to be vulnerable to hurricanes. According to the state plan the historical annualized losses from hurricanes in Anderson/Oconee County. Annualized loss estimations (building damage, contents damage, and inventory loss) due to hurricane wind hazards in Anderson/Oconee County. NOAA historical records indicate 42 hurricanes/tropical storms have come within 75 miles of Anderson/Oconee County since 1859. NCEI reports one tropical storm event for Anderson/Oconee County, Four of the eight disaster declarations in Anderson/Oconee County were directly related to a tropical storm or hurricane event. The 50-year return period peak gust for hurricane and tropical storm events in Anderson/Oconee County is 60 mph. 47 128 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Lightning Severe Storms / Thunderstorms YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database Review of Vaisala’s NLDN Lightning Flash Density Map. The central region of Florida has the highest density of lightning strikes in the US; however, lightning events are experienced in nearly every region. Lightning is discussed in the SC State Hazard Mitigation Plan, and due to its unpredictability, all buildings and facilities are considered to be equally exposed to this hazard. According to the state plan the historical annualized losses from 1960-2020 from lightning are Anderson $170,368 and Oconee $30,413. Lightning was included in the previous Anderson/Oconee County Hazard Mitigation Plan. According to Vaisala’s U.S. National Lightning Detection Network, Anderson/Oconee County is located in an area that experienced an average of 4 to 8 lightning flashes per square kilometer per year between 2010 and 2019. 48 129 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Nor’easter NO Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database. Nor’easters are discussed in the SC State Hazard Mitigation Plan as part of the winter storm hazard. Nor’easter was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. NCEI does not report any nor’easter activity for Anderson/Oconee County. However, nor’easters may have affected the area as severe winter storms. In this case, the activity would be reported under winter storm events. Severe Thunderstorm/High Wind No Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan; High winds are included with Tornadoes and Thunderstorms are included with Hail Storms. Review of NOAA NCEI Storm Events Database Review of historical presidential disaster declarations. Over 100,000 thunderstorms are estimated to occur each year on the U.S. mainland, and they are experienced in nearly every region. Severe thunderstorms are discussed in the SC State Hazard Mitigation Plan, and due to its unpredictability, all buildings and facilities are considered to be equally exposed to this hazard. According to the state plan the historical annualized losses from severe thunderstorm are $107,203 for Anderson and $105,775 for Oconee County. Severe thunderstorm/High Wind was not included in the previous Anderson/Oconee County Hazard Mitigation Plan. High winds are included in Tornadoes and Thunderstorm s are included with Hail Storms. 49 130 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Tornado / High Winds YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database Review of historical presidential disaster declarations. The U.S. reports over 800 tornadoes nationwide, resulting in an average of 80 deaths and 1,500 injuries. Tornadoes are discussed in the SC State Hazard Mitigation Plan, and because the location of tornado strikes are not limited to specific geographic regions of the state, all buildings and facilities are considered to be equally exposed to this hazard. According to the state plan the historical annualized losses from tornadoes are $216,221 for Anderson and $1,828,285 for Oconee County. Tornados were also included in the previous Anderson/Oconee County Hazard Mitigation Plan. 50 131 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Winter Storm YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database Review of historical presidential disaster declarations. Winter storms affect every state in the continental U.S. and Alaska. Severe winter storms, including blizzard, ice storm, and nor’easter, are discussed in the SC State Hazard Mitigation Plan, and while South Carolina does not regularly encounter winter storms, they can occur anywhere in the state and all buildings and facilities are considered to be equally exposed to this hazard. According to the state plan the historical annualized losses from winter storms are $1,215,466 for Anderson and $1,632,655 for Oconee County. Historically, Anderson/Oconee County have the highest number of loss-causing winter storm events in the state. Winter storms were included in the previous Anderson/Oconee County Hazard Mitigation Plan. NCEI reports that Anderson/Oconee County has been affected by 69 winter weather events since 1996 51 132 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Earthquake YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of National Geophysical Data Center website. Review of USGS Earthquake Hazards Program website. Although the zone of greatest seismic activity in the United States is along the Pacific Coast, eastern regions have experienced significant earthquakes. Earthquakes are discussed in the SC State Hazard Mitigation Plan, and the Piedmont/Blue Ridge region (which includes Anderson/Oconee County) is generally considered at a low risk of major (magnitude 6+ on the Richter Scale) earthquakes but is susceptible to smaller earthquakes (magnitude 2-4). Earthquake was included in the previous Anderson/Oconee County Hazard Mitigation Plan. Earthquakes have occurred in and around the State of South Carolina in the past. The state is affected by the Charleston Fault line which has generated one magnitude 8.0 earthquake in the last 200 years. Since 2010, 12 earthquakes have been reported within 150 km of Anderson/Oconee County, all below a 3.0 magnitude. According to USGS seismic hazard maps, the peak ground acceleration (PGA) with a 10% probability of exceedance in 50 years for Anderson/Oconee County is approximately 5 to 7%g. FEMA recommends that earthquakes be further evaluated for mitigation purposes in areas with a PGA of 3%g or more. 52 133 SECTION 3: COMMUNITY PROFILE Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Expansive Soils NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of USGS Swelling Clays Map of the Conterminous US. The effects of expansive soils are most prevalent in parts of the Southern, Central, and Western U.S. Expansive soils were not included in the SC State Hazard Mitigation Plan. Expansive soils were not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. Anderson and Oconee County is located in an area that has little to no clay swelling potential. 53 134 Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Land Subsidence/Sinkhole NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Land subsidence affects at least 45 states, including South Carolina. However, because of the broad range of causes and impacts, there has been limited national focus on this hazard. The SC State Hazard Mitigation Plan did not analyze sinkholes because while South Carolina does experience sinkholes, no loss data has been collected at this time. Land subsidence was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. Tsunami NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of FEMA “How- to” mitigation planning guidance (Publication 386-2, “Understanding Your Risks – Identifying Hazards and Estimating Losses) No record exists of a catastrophic Atlantic basin tsunami impacting the mid-Atlantic coast of the United States. Tsunami inundation zone maps are not available for communities located along the U.S. East Coast. Tsunamis are described in the SC State Hazard Mitigation Plan as an extremely low threat for South Carolina, and any tsunamis impacting the state would likely be small and mostly inundate the beaches exclusively. Tsunami was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. FEMA mitigation planning guidance suggests that locations along the U.S. East Coast have a relatively low tsunami risk and do not need to conduct a tsunami risk assessment at this time. 54 135 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Volcano NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of USGS Volcano Hazards Program website. More than 65 potentially active volcanoes exist in the United States, and most are located in Alaska. The Western states and Hawaii are also potentially affected by volcanic hazards. Volcano was not included in the SC State Hazard Mitigation Plan. Volcano was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. There has not been a volcanic eruption in South Carolina in over 750 million years. However, the red clay soil found in the area is a result of iron that flowing lava brought to the area. No volcanoes are located in or near Anderson/Oconee County. HYDROLOGIC HAZARDS Dam and Levee Failure NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. The National Inventory of Dams shows dams are located in every state. Dam/levee failure is discussed in the SC State Hazard Mitigation Plan as part of the flood hazard. Dam and levee failure was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. 55 136 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Erosion NO Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Erosion is discussed in the SC State Hazard Mitigation Plan under costal hazards. Only coastal erosion is identified as a hazard of concern for South Carolina (not riverine or soil erosion). Erosion was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. 56 137 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Flood YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of National Oceanic and Atmospheric Administration (NOAA). National Centers for Environmental Information (NCEI) Storm Events Database. Review of historical disaster declarations. Review of FEMA Flood Insurance Rate Maps (DFIRM) data. Review of FEMA’s National Flood Insurance Program(NFIP)Communi ty Status Book and Community Rating System (CRS). Floods occur in all 50 states and in the U.S. territories. Flooding is the most frequent and costly hazard in the US; 75% of all presidential disasters have been related to flooding. Flood is thoroughly discussed in the SC State Hazard Mitigation Plan. The State is found to be at risk of riverine flooding, coastal flooding, flash flooding, local drainage problems, and dam/levee failure. According to the state plan the historical annualized losses from flood are $80,982 for Anderson and $115,907 for Oconee County. Flood was included in the previous Anderson/Oconee County Hazard Mitigation Plan. Seven jurisdictions in Anderson county and three in Oconee participate in the NFIP; however, no jurisdictions currently participate in the CRS. 57 138 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Storm Surge NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database. Given the inland location of Anderson/Oconee County, storm surge would not likely affect the area. Storm surge is discussed in the SC State Hazard Mitigation Plan under the hurricane hazard, and the state plan indicates that only the coastal shoreline counties are subject to storm surge. Storm surge was not identified as a hazard in the previous Anderson Oconee County Hazard Mitigation Plan. NCEI does not report any historical storm surge events for Anderson/Oconee County. 58 139 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Coastal Flooding & High Winds NO Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of NOAA NCEI Storm Events Database. Given the inland location of Anderson/Oconee County, coastal flooding would not likely affect the area. Any high winds would be associated with hurricanes traveling inland. Coastal flooding & winds are discussed in the SC State Hazard Mitigation Plan under the hurricane hazard, and the state plan indicates that only the coastal shoreline counties are subject to coastal flooding & winds. Coastal flooding & high winds were not identified as a hazard in t he previous Anderson Oconee County Hazard Mitigation Plan. NCEI does not report any historical coastal flooding events for Anderson/Oconee County. 59 140 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? OTHER HAZARDS Wildfire YES Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of Southern Wildfire Risk Assessment (SWRA). Data Review of the SC Forestry Commission website and data. Wildfires occur in virtually all parts of the United States. Wildfire hazard risks will increase as low-density development along the urban/wildland interface increases. Wildfire is discussed in the SC State Hazard Mitigation Plan, and since the majority of wildfires are human- caused or from lightning strikes, they can occur anywhere in South Carolina and all buildings and facilities are considered to be equally exposed to this hazard. According to the state plan, the historical annualized losses from wildfire for Anderson County is $0. However, Anderson experienced one fire in 1985 causing over 239,430 crop damage and 3,900 property damage less than 100 acres damage: Oconee County did experience one major fire in 1985 causing over $26,478.88 in property damage and $264,788.71 in crop damage, and over 100 acres property damage.; however neighboring Pickens county experienced the Pinnacle Mountain fire in 2016, which resulted in more than $5 million in expenses and 10,623 acres burned. Wildfire was included in the previous Anderson/Oconee County Hazard Mitigation Plan. A review of SWRA data indicates that there are some areas of elevated concern in Anderson/Oconee County. 60 141 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Hazardous Materials Incident No Review of FEMA’s Multi-Hazard Identification and Risk Assessment. Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Review of EPA Toxic Release Inventory (TRI). Review of USDOT Pipeline and Hazardous Materials Safety. Administration (PHMSA) incident database. Discussions with local LEPC/HazMat officials. Cities, counties, and towns where hazardous materials fabrication, processing, and storage sites are located, and those where hazardous waste treatment, storage or disposal facilities operate, are at risk for hazardous materials events. Although hazardous materials incidents are discussed in the SC State Hazard Mitigation Plan, annualized losses from hazardous materials incidents are not reported. The SC State Hazard Mitigation Plan indicates the following hazardous materials sites are located within Anderson County: 56 TRI sites, 1 Hazardous Material Treatment/Storage/Disposal sites, and 25 Solid Waste Landfills. Oconee County: 24 TRI sites, and 8 Solid Waste Landfills. 61 142 Natural Hazards Considered Was this hazard identified as a significant hazard to be addressed in the plan at this time? (Yes or No) How was this determination made? Why was this determination made? Transportation Incident No Review of SC State Hazard Mitigation Plan. Review of previous Anderson/Oconee County Hazard Mitigation Plan. Discussions with local officials. Transportation incident was not included in the SC State Hazard Mitigation Plan. Transportation incident was not identified as a hazard in the previous Anderson/Oconee County Hazard Mitigation Plan. 62 143 4.1 HAZARD IDENTIFICATION RESULTS TABLE 4.4: SUMMARY RESULTS OF THE HAZARD IDENTIFICATION AND EVALUATION PROCESS ATMOSPHERIC HAZARDS GEOLOGIC HAZARDS  Avalanche  Earthquake  Drought  Expansive Soils  Extreme Cold  Landslide  Hailstorm  Land Subsidence/Sinkhole  Heat Wave/Extreme Heat  Tsunami  Hurricane/Tropical Storm  Volcano  Lightning HYDROLOGIC HAZARDS  Nor’easter  Dam and Levee Failure  Severe Thunderstorm/High Wind  Erosion  Tornado  Flood  Winter Storm and Freeze  Storm Surge OTHER HAZARDS  Wildfire Hazardous Materials Incident Transportation Incident  = Hazard considered significant enough for further evaluation in the Anderson & Oconee County hazard risk assessment. 63 144 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 SECTION 5 HAZARD PROFILES This section includes detailed hazard profiles for each of the hazards identified in Section 4 ( Hazard Identification) as significant enough for further evaluation in the Multi -Jurisdictional Hazard Mitigation Plan. It contains the following subsections: Overview ❖ 5.1 Overview ❖ 5.2 Study Area Atmospheric Hazards ❖ 5.3 W i n t e r S t o r m s ❖ 5.4 Hail/Thunderstorms ❖ 5.5 L i g h t i n g / T h u n d e r s t o r m s ❖ 5.6 T o r n a d o / H i g h W i n d s ❖ 5.7 Drought/Heatwave ❖ 5.8 F l o o d s ❖ 5.9 W i l d f i r e s ❖ 5.10 H u r r i c a n e ❖ 5.11 Earthquake Conclusions ❖ 5.17 Conclusions on Hazard Risk ❖ 5.18 Final Determinations Overview 5.1 OVERVIEW This section includes detailed hazard profiles for each of the hazards identified in Section 4 ( Hazard Identification) as significant enough for furthe r evaluation in the Multi -Jurisdictional Hazard Risk Assessment by creating a hazard profile. Each hazard profile includes a general description of the hazard, its location and extent, notable historical occurrences, and the probability of future occurrences. 44 CFR Requirement 44 CFR Part 201.6(c)(2)(i): The risk assessment shall include a description of the type, location and extent of all natural hazards that can affect the jurisdiction. The plan shall include information on previous occurrences of hazard events and on the probability of future hazard events 64 145 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Each profile also includes specific items noted by members of the Hazard Mitigation Planning Team as it relates to unique historical or anecdotal hazard information for Anderson County & Oconee County or a participating municipality within it. The following hazards were identified: ❖ Atmospheric ❖ Drought/Heatwave ❖ Hail/Thunderstorm ❖ Hurricane/Tropical Storm ❖ Lightning ❖ Severe Thunderstorm/High Wind ❖ Tornado ❖ Winter Storm and Freeze ❖ Wildfire The DMA 2000 legislation and related FEMA planning guidance require mitigation plans to include discussion of community vulnerability to natural hazards. Vulnerability is generally defined as the damage (including direct damages and loss of function) that would occur when various levels of hazards impact a structur e, operation or population. For example, vulnerability can be expressed as the percent damage to a building when it is flooded, or the number of days that a government office will be shut down after a windstorm, etc., assuming there is sufficient detailed data available to support the calculations. Because this Plan update is at the scale of multiple entire Counties, it is not practical to complete vulnerability assessments on the many individual assets, operations and populations in the planning area. It i s possible, however, to make some general observations based on the hazard identifications and risk assessments that are the subjects of Section 5 of this Plan update. Therefore, the following terms are used to describe levels of vulnerability. • High – 66%-100% percent damage to a building when it is flooded, or the number of days that a government office will be shut down. • Moderate – 34%-65% percent damage to a building when it is flooded, or the number of days that a government office will be shut down. • Low – 0%-33% percent damage to a building when it is flooded, or the number of days that a government office will be shut down. As illustrated in Section 4 (Hazard Identification), each County is subject to numerous natural hazards, although in some cases the hazards have rarely impacted the area, or their effects have been relatively minor. It is important to recognize that several other hazards present significant risks (i.e., potential for future losses) to the County, even though they have occurred infrequently in the past, or have not caused much damage. 65 146 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 The impact/extent of damage is derived primarily from utilizing calculations from the University of South Carolina Hazards & Vulnerability Research Institute Department of Geography Spatial Hazard Event Loss Dataset for the US (SHELDUS) information which o riginally contained only those events that generated greater than $50,000 in combined crop and property damage. This damage assessment is countywide regardless of municipal boundaries. Damage in less severe degrees may have occurred throughout the county a nd its municipalities affecting each municipality in varying degrees depending on the severity of the hazard and time of year. The full list of events, regardless of dollar amount, can be found on the University of South Carolina Hazards & Vulnerability Research Institute’s SHELDUS website. In conjunction with the events noted on data from SHELDUS the vulnerability of the Counties was calculated using the total number of events that met the threshold of $50,000 in damage, number of years, and reoccurrence intervals; to provide a frequency hazard percentage for each hazard. During the 2023 HMP update FEMA National Risk Index (NRI) was utilized for each hazard. Risk index analysis statistics were provided by FEMA and placed into corresponding sections. Each data set had varying time periods, none going over the year 2017 for each risk. Risk Index scores are calculated by FEMA using an equation that combines scores for Expected Annual Loss due to natural hazards, Social Vulnerability, and Community Resilience: Expected Annual Loss ×Social Vulnerability ÷Community Resilience =Risk Index Other data was compiled from various other sources such as maps from FEMA Resilience Analysis and Planning Tool (RAPT) and climate data from National Centers for Environmental Information. Compiling data from various sources allowed both counties to ensure that ample amounts of research, this would make mitigation strategies simpler in critical moments. 66 147 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 5.2 STUDY AREA Anderson and Oconee County includes 14 municipalities and the unincorporated area of the counties. Table 5.1 provides a summary table of the participating municipalities. In addition, Figure 5.1 provides a base map of Anderson County for reference. Figure 5.2 provides a base map of Oconee County for reference. TABLE 5.1: PARTICIPATING JURISDICTIONS IN THE ANDERSON & OCONEE COUNTY HAZARD MITIGATION PLAN Anderson County Oconee County Anderson Salem Belton Seneca Honea Path Wahalla Iva West Union Pendleton Westminster Pelzer Starr West Pelzer Williamston 67 148 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 FIGURE 5.1: ANDERSON COUNTY BASE MAP 68 149 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 FIGURE 5.2: OCONEE COUNTY BASE MAP 69 150 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 FIGURE 5.3 SUMMARY OF IDENTIFIED HAZARD EVENTS IN ANDERSON & OCONEE COUNTY https://www.arcgis.com/apps/mapviewer/index.html?layers=5c112c1f08e54108b410a67e8a93a07a The maps presented in Figure 5.3 are an overview of both Anderson and Oconee counties and their municipalities that are participating in the 2023 update of the haza rd mitigation plan. The data provided also gives a brief overview of the particular hazards that will be discussed throughout this portion of the plan. In a conjoining effort, both Anderson and Oconee counties have provided ample amounts of data to calculate risks, event probability, and recommendations for mitigation. 70 151 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Atmospheric Hazards 5.3 Winter storms 5.3.1 Background A winter storm can range from a moderate snow over a period of a few hours to blizzard conditions with blinding wind-driven snow that lasts for several days. Events may include snow, sleet, freezing rain, or a mix of these wintry forms of precipitation. Some winter storms might be large enough to affect several states while others might affect only localized areas. Occasionally, heavy snow might also cause significant property damages, such as roof collapses on older buildings. All winter storm events have the potential to present dangerous conditions to the affected area. Snowstorms Larger snowfalls pose a greater risk, reducing visibility due to blowing snow and making driving conditions treacherous. A heavy snow event is defined by the National Weather Service as an accumulation of 4 of or more inches in 12 hours or less. A blizzard is the most severe form of wint er storm. It combines low temperatures, heavy snow, and winds of 35 miles per hour or more, which reduces visibility to a quarter mile or less for at least 3 hours. Winter storms are often accompanied by sleet, freezing rain, or an ice storm. Such freeze events are particularly hazardous as they create treacherous surfaces. Ice Storms Ice storms are defined as storms with significant amounts of freezing rain and are a result of cold air damming (CAD). CAD is a shallow, surface -based layer of relatively co ld, stably stratified air entrenched against the eastern slopes of the Appalachian Mountains. With warmer air above, falling precipitation in the form of snow melts, then becomes either super -cooled (liquid below the melting point of water) or re-freezes. In the former case, super -cooled droplets can freeze on impact (freezing rain); while in the latter case, the re -frozen water particles are ice pellets (or sleet). Sleet is defined as partially frozen raindrops or refrozen snowflakes that form into small ice pellets before reaching the ground. They typically bounce when they hit the ground and do not stick to the surface. However, it does accumulate like snow, posing similar problems and has the potential to accumulate into a layer of ice on surfaces. Freezing rain, conversely, usually sticks to the ground, creating a sheet of ice on the roadways and other surfaces. All of the winter storm elements – snow, sleet, ice, etcetera – have the potential to cause significant hazard to a community. Even small accumu lations can down power lines and tree limbs and create hazardous driving conditions. Furthermore, communication and power may be disrupted for days. https://www.ncdc.noaa.gov/stormevents/ https://www.c2es.org/content/tornadoes-and-climate-change/ 71 152 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 According to SC Hazard Mitigation Plan winter weather events in South Carolina can be high -impact incidents because of their rarity. In the Upstate, two or three winter events with snow or ice accumulation or freezing rain accretion typically occur per winter season. The Midlands and Pee Dee regions average about one winter precipitation event per season. There may be several years between winter events in the Lowcountry. Most of the state averages two inches or less of snowfall each year. The annual snowfall average is higher in the mountains, with a mean yearly snowfall of five to seven inches at the state’s highest elevations. Winter weather events that impact South Carolina often include a combination of snow, sleet, and freezing rain. 72 153 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Major disaster declarations Winter storms (consisting of snow, ice, and cold temperatures) can cause major problems in regions that are not prepared for them. These types of storms can damage property, create safety risks, destroy crops and valuable timber, damage infrastructure components such as power lines, and have enormous economic impacts (SCEMD). There were major Southeastern snowstorms in 1899, 1914, 1973, 2000, and 2002. Additionally, there have been many more localized winter storms. In January 1968 and February 1979 large i ce storms paralyzed the County for several days. More recently in 2002, 2004, 2005, and 2014 ice and snowstorms covered the Region resulting in power outages and hazardous driving conditions. Each County suffers an average of one to two winter storms each year. There have been several significant winter storm events within South Carolina designated as “Major Disaster Declaration” Severe Weather Storm Incident Start Date: Incident End Date: Declared as Major Disaster: Winter Storm: DR-4166 2/10/2014 2/15/2014 3/12/2014 Ice Storm: DR-1625 12/15/2005 12/16/2005 1/20/2006 Ice Storm: DR-1509 1/26/2004 1/30/2004 2/13/2004 Ice Storm: DR-1451 12/4/2002 12/6/2002 1/8/2003 Winter Storm: DR-1313 1/22/2000 2/1/2000 1/31/2000 Official website of the Department of Homeland Security (https://www.fema.gov/disasters) 73 154 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 5.3.2 Community Risk Analysis Ice Storms In data compiled by FEMA, via the National Risk Index, Anderson County has a relatively high risk of ice storms, and an expected annual loss of $0.88M, as shown in figure 5.3.2. Oconee county has a relatively high risk of winter weather, with an expected annual loss of $0.61M as shown in figure 5.3.3. Figure 5.3.2 Anderson County risk analysis Figure 5.3.3 Oconee County risk analysis 74 155 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Winter Weather In data compiled by FEMA, via the National Risk Index, Anderson County has a very low risk of winter weather, and an expected annual loss of $2.1k, as shown in figure 5.3.5. Oconee county has a relatively moderate risk of winter weather, with an expected annual loss of $0.12M as shown in figure 5.3.6. Figure 5.3.5 Anderson County risk analysis Figure 5.3.6 Oconee County risk analysis 75 156 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Location and Spatial Extent Nearly the entire continental United States is susceptible to winter storm events. Some ice and winter storms may be large enough to affect several states while others might affect limited, localized areas. The degree of exposure typically depends on the normal expected severity of local winter weather. Anderson and Oconee Counties are accustomed to severe winter weather conditions and often receives winter weather during the winter months. Given the atmospheric nature of the hazard, all jurisdictions within the counties are uniformly exposed to winter storms. Current climate models indicate global average temperatures may rise between 4.7 to 8.6 degrees by the end of the century, the increased rate of precipitation events will likely cause an increase in the frequency and severity of winter storms impacting Anderson and Oconee Counties County in the future. https://www.c2es.org/content/climate-impacts/ Figure 5.3.7 South Carolina Hazard Risk Score Historical Occurrences According to Spatial Hazard Event and Losses Database (SHELDUS) for the United States, Anderson and Oconee Counties have had a combined 55 winter storm events that have reached a threshold of $50,000. Tables 5.3.8 and 5.3.9 detail those events totaling $36,789,816.80 in total property damage and 1.34 injuries. All data has been updated to 2020 inflation, and charts provided by SHELDUS reflect this change. 76 157 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Anderson County Extent Considering the frequency and intensity of winter storm events in Anderson County; the future predictability frequency and intensity of winter storm events is low as the entire county is equally susceptible to winter storm events and likely to cause low to moderate crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 8 days and 2 days event causing property damage, causing property damage ranging from 5,000 to 5,000 dollars in damage for a total of 10,000 dollars property damage, with zero deaths and injuries. Storm Events Database Search Results for Anderson County, South Carolina Event Types: Winter Storm Anderson county contains the following zones: Anderson 8 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 1 Number of Days with Event: 8 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 0 Number of Days with Event and Property Damage: 2 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Anderson County has experienced 15 notable winter weather evens from the time frame of 01/01/1970 through 01/01/2021. A winter weather event is considered notable when it causes at or above $50,000 in combined property and crop damages. These winter weather events have caused 1.59 fatalities and .67 injuries to county residents. They caused a collective $21,258,855.88 in property damage and $60,045,920.90 in crop damages adjusted to 2020 inflation. Data has been provided and adjusted through SHELDUS. 77 158 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Table 5.3.8 Anderson County Notable Winter Weather Events from 1/1/1970-1/1/2021 SHELDUS Query results Date Hazard Crop Damage (ADJ) Fatalities Injuries Property Damage (ADJ) 3/16/17 *Wind/Winter Weather 52,543,097.72 0 0 0 4/8/07 Winter Weather 3,792,569.38 0 0 0 12/15/05 Winter Weather 0 0 0 268,427.69 12/4/02 Winter Weather 0 0 0 16,027,326.54 1/2/99 Winter Weather 0 0 0 3,146,694.37 3/8/96 Winter Weather 2,784,359.9 0 0 0 3/13/93 Winter Weather 64,784.89 0 0 64,784.89 3/21/90 Winter Weather 217,989.78 0 0 0 2/17/89 Winter Weather 0 0 0 132,116.75 2/17/89 Winter Weather 0 1 0 132,116.75 2/6/79 Winter Weather 601.76 0 0 601,743.91 2/9/73 Winter Weather 641.72 0.2 0 641,695.15 1/7/73 Winter Weather 641,695.15 0 0 64,169.54 3/25/71 Winter Weather 179.79 0.39 0.67 179,780.29 12/3/71 *Severe Storm/Thunderstorm/ Wind/Winter Weather 70,348.83 0 0 70,348.83 Total $60,116,269.7 1.59 .67 $21,329,204.60 Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University *Hazard may be repeated in another section 78 159 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Winter Storm Probability and Vulnerability Anderson County: Winter Weather Probability County Number of Events Years Recurrence Intervals (years) Hazard Frequency (% change/year) Anderson 15 50 3.33 30% Vulnerability Anderson County Overall, Anderson County has a moderate level vulnerability to winter storms. The probability of one or more winter weather events in Anderson County is 30%. Examining past events, it is evident that winter storms can significantly disrupt normal operations within a community. In addition, some ice storms associated with winter storms have caused significant property damage and disruption of the electric utilit ies. Overall, when taking into consideration the moderate level vulnerability of winter storms in the county, and the past history of the event, the municipalities have a moderate level vulnerability to winter storms. Recommendation: Early warnings are possibly the best hope for residents when a winter storm strikes. Citizens must immediately be aware when a community will be facing a winter storms incident. Communities that do not already possess warning systems should plan to purchase a system. Storm she lters are another important means of mitigating the effects of winter storm events. A community-wide shelter program should be considered for residents who may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios to ensure that everyone has sufficient access to information in times of severe weather. Oconee County Extent Considering the frequency and intensity of winter storm events in Oconee County; the future predictability frequency and intensity of winter storm events is low as the entire county is equally susceptible to winter storm events and likely to cause low to moderate crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of days events being 13 with 2 event days causing property damage of 5,000 to 5,000 dollars in property damage with a total o f 20,000 in property damage and zero deaths and injury. Storm Events Database Search Results for Oconee County, South Carolina 79 160 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Event Types: Winter Storm Oconee county contains the following zones: Oconee Mountains, Greater Oconee 23 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 4 Number of Days with Event: 13 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 0 Number of Days with Event and Property Damage: 2 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Oconee County has experienced 27 notable winter weather events from the time frame of 01/01/1970 through 01/01/2021. A winter weather event is considered notable when it causes at or above $50,000 in combined property and crop damages. These winter weather events have caused 1.18 fatalities and .67 injuries to county residents. They caused a collective $15,460,612.2 in property damage and $125,052,531. in crop damages adjusted to 2020 inflation. Table 5.3.8: Oconee County Notable Winter Weather Events from 1/1/1970-1/1/2021 SHELDUS Query results 80 161 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Date Hazard Crop Damage (ADJ) Fatalities Injuries Property Damage (ADJ) 3/16/17 *Wind/ Winter Weather 52,543,097.72 0 0 0 3/16/17 *Wind/ Winter Weather 52,543,097.72 0 0 0 4/8/07 Winter Weather 1,264,189.79 0 0 0 4/8/07 Winter Weather 7,585,138.77 0 0 0 12/15/05 Winter Weather 0 0 0 100,660.38 12/4/02 Winter Weather 0 0 0 7,285,148.43 12/4/02 Winter Weather 0 0 0 2,914,059.37 1/2/99 Winter Weather 0 0 0 3,146,694.37 1/9/97 Winter Weather 0 0 0 65,325.77 3/8/96 Winter Weather 2,784,359.9 0 0 0 3/13/93 Winter Weather 64,784.89 0 0 64,784.89 12/27/92 Winter Weather 33,362.13 0 0 33,362.13 3/21/90 Winter Weather 217,989.78 0 0 0 2/17/89 Winter Weather 0 0 0 132,116.75 2/17/89 Winter Weather 0 0 0 132,116.75 4/10/85 Winter Weather 203,004.67 0 0 0 12/25/83 Winter Weather 28,605.7 0.59 0 28,605.7 4/17/83 Winter Weather 2,860,568.8 0 0 0 4/7/82 Winter Weather 3,395,332.13 0 0 0 3/27/82 Winter Weather 295,247.22 0 0 0 2/6/79 Winter Weather 601.76 0 0 601,743.91 4/11/73 Winter Weather 163,988.78 0 0 0 2/9/73 Winter Weather 641.72 0.2 0 641,695.15 1/7/73 Winter Weather 641,695.15 0 0 64169.54 4/1/72 Winter Weather 356,295.72 0 0 0 3/25/71 Winter Weather 179.79 0.39 0.67 179,780.29 12/3/71 *Severe Storm/Thunderstor m/Wind/Winter Weather 70,348.83 0 0 70,348.83 Total 125,052,531 1.18 .67 15,460,612.20 Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University Oconee County: Oconee County Winter Weather Probability 81 162 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 County Number of Events Number of Years Recurrence Interval (years) Hazard Frequency (% chance/year) Oconee 27 50 1.85 54% Vulnerability Oconee County Overall, Oconee County has a moderate level of vulnerability to winter storms. The probability of one or more winter weather events in Oconee County is 54%. Examining past events, it is evident that winter storms can significantly disrupt normal operations within a community. In addition, some ice storms associated with winter storms have caused significant property damage and disruption of the electric utilities. Overall, when taking into consideration the moderate level of vulnerability to winter storms in the county, and the past history of the event, the municipalities have a moderate level of vulnerability to winter storms. Recommendations Early warnings are possibly the best hope for residents when a winter storm strikes. Citizens must immediately be aware when a community will be facing a winter storms incident. Communities that do not already possess warning systems should plan to purchase a system. Storm shelters are another important means of mitigating the effects of winter storm events. A community-wide shelter program should be considered for residents who may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios to ensure that everyone has sufficient access to information in times of severe weather. 5.4 Hail/Thunderstorms Background NOAA classifies thunderstorms as a rain-bearing cloud that also produces lightning, along with possible hail. All thunderstorms are dangerous. Every thunderstorm produces lightning. In the United States, an average of 300 people are injured and 80 people are killed each year by lightning. Although most lightning victims survive, people struck by lightning often report a variety of long-term, debilitating symptoms. Other associated dangers of thunderstorms include tornadoes, strong winds, hail, and flash f looding. Flash flooding is responsible for more fatalities —more than 140 annually — than any other thunderstorm-associated hazard. Hail is frozen droplets of water that thaw and freeze while wind patterns (updrafts and downdrafts) take them between colder and warmer elevations within a thunderstorm cloud. Each time the droplet re-freezes, another layer of ice is added to the object, t hus making it larger until it falls to the earth. 82 163 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Hail is a costly result of severe weather in the United States. In an average year, hail causes one billion dollars in crop and property damage each year in this country. Unlike ice pellets, hail stones are layered and can be irregular and clumped together. Hail is composed of transparent ice or alternating layers of transparent and translucent ice at least 1 millim eter (0.039 in) thick, which are deposited upon the hail stone as it cycles through the cloud multiple times, suspended aloft by air with strong upward motion until its weight overcomes the updraft and falls to the ground. There are methods available to de tect hail -producing thunderstorms using weather satellites and radar imagery. Hail stones generally fall at higher spe eds as they grow in size, though complicating factors such as melting, friction with air, wind, and interaction with rain and other hail stones can slow their descent through Earth's atmosphere. Severe weather warnings are issued for hail when the stones reach a damaging size, as it can cause serious damage to man -made structures and, most commonly, farmers' crops. In the United States, the National Weather Service issues severe thunderstorm warnings for hail 1" or greater in diameter. This threshold, effective January 2010, marked an increase over the previous threshold of ¾" hail. The Service made the change for two main reasons: a) public complacency and b) recent research suggesting that damage does not occur until a hailstone reaches 1" in diameter. (NOAA/ National Weather Service National Centers for Environmental Prediction). Hailstorms are a potentially damaging outgrowth of severe thunderstorms (thu nderstorms are discussed separately). Early in the developmental stages of a hailstorm, ice crystals form within a low- pressure front due to the rapid rising of warm air into the upper atmosphere and the subsequent cooling of the air mass. Frozen droplets gradually accumulate on the ice crystals until they develop to a sufficient weight and fall as precipitation. Hail typically takes the form of spheres or irregularly shaped masses greater than 0.75 inches in diameter. The size of hailstones is a direct fun ction of the size and severity of the storm. High velocity updraft winds are required to keep hail in suspension in thunderclouds. The strength of the updraft is a function of the intensity of heating at the Earth’s surface. Higher temperature gradients re lative to elevation above the surface result in increased suspension time and hailstone size.3 Table 5.4.1 shows the Tornado and Storm Research Organization’s (TORRO) Hailstorm Intensity Scale which is a way of measuring hail severity.4 TABLE 5.4.1: TORRO HAILSTORM INTENSITY SCALE 83 164 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Scale Intensity category Typical hail diameter (mm)* Probable kinetic energy J m-2 Typical damage impacts H0 Hard hail 5 0-20 No damage H1 Potentially damaging 5-15 >20 Slight general damage to plants, crops H2 Significant 10-20 >100 Significant damage to fruit, crops, vegetation H3 Severe 20-30 >300 Severe damage to fruit and crops, damage to glass and plastic structures, paint and wood scored H4 Severe 25-40 >500 Widespread glass damage, vehicle bodywork damage H5 Destructive 30-50 >800 Wholesale destruction of glass, damage to tiled roofs, significant risk of injuries H6 Destructive 40-60 Bodywork of grounded aircraft dented, brick walls pitted H7 Destructive 50-75 Severe roof damage, risk of serious injuries H8 Destructive 60-90 (Severest recorded in the British Isles) Severe damage to aircraft bodywork H9 Super Hailstorms 75-100 Extensive structural damage. Risk of severe or even fatal injuries to persons caught in the open H10 Super Hailstorms >100 Extensive structural damage. Risk of severe or even fatal injuries to persons caught in the open Source: http://www.torro.org.uk/site/hscale.php 2 https://www.c2es.org/content/drought-and-climate- change/#:~:text=How%20climate%20change%20contributes%20to,the%20timing%20of%20water%20availability. 3 https://www.nssl.noaa.gov/education/svrwx101/hail/ 4 https://www.torro.org.uk/v2021/ 5 https://www.weather.gov/phi/ThunderstormDefinition Community Risk Analysis Hail Risk Analysis 84 165 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 In data compiled by FEMA, via the National Risk Index, Anderson County has a relatively low risk of hail, and an expected annual loss of $0.18M, as shown in figure 5.4.2. Oconee county has a relatively low risk of hail, with an expected annual loss of $0.11M as shown in figure 5.4.3. Figure 5.4.2 Anderson County risk analysis Figure 5.4.3 Oconee County risk analysis Location and Spatial Extent 85 166 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Hailstorms frequently accompany thunderstorms, so their locations and spatial extents coincide. Due to the large spatial extent of thunderstorms and their paths relative to the area of Anderson and Oconee Counties, it is assumed that all jurisdictions within Anderson and Oconee Counties are uniformly exposed to severe thunderstorms. Additionally, bec ause there is no clear distinction between thunderstorms that produce hailstones and thunderstorms that do not, all areas of the county are equally exposed to hail with that in mind, Figure 5.4.4 and 5.4.5 shows the location of hail events that have impacted the county between 1955 and 2021. Furthermore, the link between climate change and increases in the frequency and severity of extreme precipitation events indicates hailstorms may increase in frequency and magnitude within Anderson and Oconee Counties. Figure 5.4.4 Anderson County Hail events 1955-2017 https://fema.maps.arcgis.com/apps/webappviewer/index.html?id=90c0c996a5e242a79345cdbc5f758fc6# Figure 5.4.5 Oconee County Hail events 1955-2017 86 167 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 https://fema.maps.arcgis.com/apps/webappviewer/index.html?id=90c0c996a5e242a79345cdbc5f758fc6# Historical Occurrences According to Spatial Hazard Event and Losses Database (SHELDUS) for the United States Anderson and Oconee Counties have had a combined 54 hailstorm events that have reached a threshold of $50,000. Tables 5.4.6 and 5.4.7 detail those events totaling $18,581,122.47 in total property damage and 5.89 injuries. All data has been updated to 2020 inflation, and charts provided by SHELDUS reflect this change. Anderson County 87 168 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Extent Considering the frequency and intensity of Hail Storms in Anderson County; the future predictability frequency and intensity of hail storms is moderate as the entire county is equally susceptible to hail storms and likely to cause low to moderate crop dam age, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 137 days and 2 event days causing property damage ranging from 100 to 200,000 dollars in damage with a total of over 300,000 dollars in property damage, with zero deaths and injuries and hail size ranging from .75 inches (penny size) to 4.00 inches (grapefruit size). Storm Events Database Search Results for Anderson County, South Carolina Event Types: Hail 214 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 2 Number of Days with Event: 137 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 0 Number of Days with Event and Property Damage: 2 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Approximate Hail Size: Appearance Approximate Size in Inches Pea 0.25 - 0.50 inch Penny 0.75 inch Nickel 0.88 inch Quarter 1.00 inch Half Dollar 1.25 inch Walnut/Ping Pong 1.50 inch Golf ball 1.75 inch Hen Egg 2.00 inch Tennis Ball 2.50 inch Baseball 2.75 inch Tea Cup 3.00 inch Grapefruit 4.00 inch 88 169 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Softball 4.50 inch National Centers for Environmental Information (NCEI) (noaa.gov) Considering the frequency and intensity of Thunderstorm wind in Anderson County; the future predictability frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to Thunderstorm wind and likely to cause moder ate crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 342 days and 59 event days causing property damage ranging from 1,000 to 500,000 totaling over 4.207 million dollars in damage, with 1 deaths and 15 injuries, with wind speeds ranged from 50 to 75 kts. Storm Events Database Search Results for Anderson County, South Carolina Event Types: Thunderstorm Wind 483 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 2 Number of Days with Event: 342 Number of Days with Event and Death: 1 Number of Days with Event and Death or Injury: 7 Number of Days with Event and Property Damage: 59 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Anderson County has experienced 36 notable hailstorms and thunderstorms from the time frame of 01/01/1970 through 01/01/2021 A hailstorm/thunderstorm is considered notable when it causes at or greater than $50,000 in combined property and crop damages. These 36 notable hailstorms have caused 5.36 injuries to county residents and 0 .05 fatalities. These notable hailstorms have caused a collective $11,053,028.99 in property damage and $589,847.26 in crop damage, adjusted for 2020 inflation. Table 5.4.6: Anderson County Notable Hailstorms/ Thunderstorms from 1/1/1970-1/1/2021 SHELDUS Query results 89 170 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Date Hazard Crop Damage (ADJ) Fatalities Injuries Property Damage (ADJ) 9/18/75 *Flooding/ Lightning/ Severe Storm/Thunderstorm 12,180.28 0.5 1.5 1,218,028.07 10/8/76 *Flooding/ Severe Storm/Thunderstorm 38,388.92 0 0.33 383,889.32 7/3/14 Hail 0 0 0 221,444.68 7/13/03 Hail 0 0 0 142,456.33 4/23/87 Hail 11,536.96 0 0 115,369.56 6/10/82 *Hail/ Lightning/ Severe Storm/Thunderstorm/ Wind 331,251.92 0 0.2 331,251.92 7/25/93 *Hail/ Severe Storm/Thunderstorm/ Wind 0 0 2 90,698.84 7/8/93 *Hail/ Severe Storm/Thunderstorm/ Wind 0 0 0 181,397.67 4/4/89 *Hail/ Severe Storm/Thunderstorm/ Wind 0 0 0 105693.4 2/21/93 *Hail/ Tornado 0 0 0 90,,698.84 4/4/89 *Hail/ Tornado 0 0 0 1,056,934.03 3/28/84 *Hail/ Wind 126,140.35 0 0 1,261,403.47 9/2/70 *Lightning/ Severe Storm/Thunderstorm 0 0 0 337,783.04 3/23/79 *Severe Storm/Thunderstorm 0 0 1.33 60,174.4 7/21/18 *Severe Storm/Thunderstorm/ Wind 0 0 0 52,192.82 4/5/17 *Severe Storm/Thunderstorm/ Wind 0 0 0 105,086.2 5/12/16 *Severe Storm/Thunderstorm/ Wind 0 0 0 53,631.01 7/18/15 *Severe Storm/Thunderstorm/ Wind 0 0 0 221182.14 6/25/10 *Severe Storm/Thunderstorm/ Wind 0 0 0 120,207.49 90 171 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 6/15/10 *Severe Storm/Thunderstorm/ Wind 0 0 0 300,518.72 7/3/05 *Severe Storm/Thunderstorm/ Wind 0 0 0 53,685.54 6/6/05 *Severe Storm/Thunderstorm/ Wind 0 0 0 53,685.54 11/11/02 *Severe Storm/Thunderstorm/ Wind 0 0 0 145,702.97 7/4/01 *Severe Storm/Thunderstorm/ Wind 0 0 0 2,220,098.59 6/13/01 *Severe Storm/Thunderstorm/ Wind 0 0 0 740,032.86 8/24/00 *Severe Storm/Thunderstorm/ Wind 0 0 0 152,218.14 1/7/98 *Severe Storm/Thunderstorm/ Wind 0 0 0 160,809.6 6/26/94 *Severe Storm/Thunderstorm/ Wind 0 0 0 88,434.43 2/10/90 *Severe Storm/Thunderstorm/ Wind\ 0 0 0 100275.3 5/5/89 *Severe Storm/Thunderstorm/ Wind 0 0 0 105,,693.4 8/1/88 *Severe Storm/Thunderstorm/ Wind 0 0 0 110,785.99 7/2/83 *Severe Storm/Thunderstorm/ Wind 0 0 0 131,586.16 12/3/71 *Severe Storm/Thunderstorm/ Wind/Winter Weather 70,348.83 0 0 70,348.83 7/13/13 *Severe Storm/Thunderstorm/ Wind 0 0 0 112,518.46 Total 589,847.26 0.5 5.36 11,053,028.99 Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University 91 172 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 *Hazard may be repeated in another section Anderson County Probability of a Hailstorm/ Thunderstorm County Number of Events Number of Years Recurrence Interval (years) Hazard Frequency (% chance/year) Anderson 36 55 1.53 65% Vulnerability Anderson County Overall, Anderson County has a low vulnerability to hailstorms. There is a 65% probability that more than one hail producing storm will occur in Anderson County in a year time frame. Based on passed events, the hailstorms have caused some damage within the County. Overall, the County’s vulnerability to a damaging event is low. Recommendation: Early warnings are possibly the best hope for residents when hailstorms strike. Citizens must immediately be aware when a community will be facing a severe weather incident. Communities that do not already possess warning systems should plan to purchase a system. Storm shelters are another important means of mitigating the effects of hailstorm events. A community -wide shelter program should be considered for residents who may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios to ensure that everyone has sufficient access to information in times of severe weather. Oconee County Extent Considering the frequency and intensity of Hail Storm events in Oconee County; the future predictability frequency and intensity of hail storm events is moderate as the entire county is equally susceptible to hail storm events and likely to cause moderate property damage and low to moderate crop damage, and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 120 days and 1 event days causing property damage of 500,000 dollars in damage, with zero deaths and injuries and hail size ranging from .75 (penny size) inches to 2.75 inches (baseball size). Storm Events Database Search Results for Oconee County, South Carolina Event Types: Hail 92 173 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 194 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 2 Number of Days with Event: 120 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 0 Number of Days with Event and Property Damage: 1 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Approximate Hail Size: Appearance Approximate Size in Inches Pea 0.25 - 0.50 inch Penny 0.75 inch Nickel 0.88 inch Quarter 1.00 inch Half Dollar 1.25 inch Walnut/Ping Pong 1.50 inch Golf ball 1.75 inch Hen Egg 2.00 inch Tennis Ball 2.50 inch Baseball 2.75 inch Tea Cup 3.00 inch Grapefruit 4.00 inch Softball 4.50 inch National Centers for Environmental Information (NCEI) (noaa.gov) Considering the frequency and intensity of Thunderstorm wind in Oconee County; the future predictability frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to Thunderstorm wind and likely to cause moderat e crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 242 days and 41 event 93 174 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 days causing property damage ranging from 1,000 to 500,000 totaling over 1.106 million dollars in damage, with 0 deaths and 2 injuries, with wind speeds ranged from 50 to 60 kts. Storm Events Database Search Results for Oconee County, South Carolina Event Types: Thunderstorm Wind 306 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 2 Number of Days with Event: 242 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 2 Number of Days with Event and Property Damage: 41 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Oconee County has experienced 16 notable hailstorms/thunderstorms from the time frame of 01/01/1970 through 01/01/2021. A hailstorm/ thunderstorm is considered notable when it causes at or greater than $50,000 in combined property and crop damages. These 16 notable hailstorms have caused 0.53 injuries to county residents and 0.00 fatalities. These notable hailstorms have caused a collective $7,528,093.4 in property damage and $1,368,135,59 in crop damage, adjusted for 2020 inflation. Table 5.4.7: Oconee County Notable Hailstorms/ Thunderstorms from 1/1/1970-1/1/2021 SHELDUS Query results Date Hazard Crop Damage (ADJ) Fatalities Injuries Property Damage (ADJ) 8/6/78 *Flooding/ Severe Storm/Thunderstorm 5,025.3 0 0 502,529.99 10/8/76 *Flooding/ Severe Storm/Thunderstorm 38,388.92 0 0.33 383,889.32 9/13/73 *Flooding/ Severe Storm/Thunderstorm 4,919.64 0 0 4,919,662.91 4/28/02 Hail 0 0 0 728,514.84 6/10/82 *Hail/ Lightning/ Severe Storm/Thunderstorm/ Wind 331,251.92 0 0.2 331,251.92 7/4/75 *Hail/ Lightning/Wind 69,601.58 0 0 6,960.15 94 175 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 5/10/75 *Hail/ Lightning/Wind 135,336.46 0 0 13,533.66 6/14/74 *Hail/ Lightning/Wind 531,682.84 0 0 531.68 5/22/79 *Hail/ Severe Storm/Thunderstorm 180,523.17 0 0 1,805.23 4/4/89 Hail/ Tornado/ Wind 1,056.93 0 0 105,693.4 6/5/89 *Lightning/ Severe Storm/Thunderstorm/ Wind 0 0 0 105,693.4 4/28/02 *Severe Storm/Thunderstorm/ Wind 0 0 0 72,851.48 3/27/94 *Severe Storm/Thunderstorm/ Wind 0 0 0 88,434.43 7/27/93 *Severe Storm/Thunderstorm/ Wind 0 0 0 90,698.84 6/5/89 *Severe Storm/Thunderstorm/ Wind 0 0 0 105,693.4 12/3/71 *Severe Storm/Thunderstorm/ Wind/ Winter Weather 70,348.83 0 0 70,348.83 Total 1,368,135.59 0 .53 7,528,093.48 Source: Spatial Hazard Event and Losses Database (SHELDUS) for the United States. Arizona State University Oconee County Probability of a Hailstorm/Thunderstorm County Number of Events Number of Years Recurrence Interval (years) Hazard Frequency (% chance/year) Oconee 16 55 3.44 29% Vulnerability Oconee County Overall, Oconee County has a low vulnerability to hailstorms. There is a 29% probability that more than one hail producing storm will occur in Oconee County in a year time frame. Based on past events, the hailstorms have caused some damage within the County. Overall, the County’s vulnerability to a damaging event is low. Recommendation: 95 176 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Early warnings are possibly the best hope for residents when hailstorms strike. Citizens must immediately be aware when a community will be facing a severe weather incident. Communities that do not already possess warning systems should plan to purchase a system. Storm shelters are another important means of mitigating the effects of hailstorm events. A commu nity-wide shelter program should be considered for residents who may not have adequate shelter in their homes. Residents should also be encouraged to build their own storm shelters to prepare for emergencies. Local governments should encourage residents to purchase weather radios to ensure that everyone has sufficient access to information in times of severe weather. 5.5 Lightning/Thunderstorms Background The formation of lightning is still something of a mystery. Even the perceived motion of lightning is false. The light that seems to come down from the sky actually jumps up from the earth’s surface. Lightning bolts are triggered when a negatively charged cloud base induces a positive charge in the ground. Negative particles, small streaming sparks known as stepped leaders, begin to flow downward, creating a conductive channel an inch or two wide. At the same time, similar streamers are moving upward from t he ground, especially high places like treetops and tall structures. When the two streamers meet, they form a channel and a subsequent lightning bolt. The bright flash of light happens when the electrical charge excites air molecules in its path, forcing them to release light. Lightning travels up to 60,000 miles per hour, cutting a jagged path through the air as much as 10 miles long! A lightning flash is brighter than ten million 100-watt light-bulbs, and contains billions of watts – as much power as in all the electricity plants in the United States. Lightning causes damage to buildings and equipment in three different ways. First, there can be damage caused by a direct lightning strike. Such damage include damage to roofing materials, structures such as chimneys, heating or air conditioning units located on the roof or exterior of a building, or fires caused by lightning igniting combustible material, such as wood-frame buildings or flammable liquids or vapors. Second, part of the lightning cur rent can be carried inside a building by electric power, telephone, analog or digital data lines (e.g., closed circuit television cameras, sensors in an industrial plant, etc.). This direct injection of lightning current inside a building can cause immense damage to electrical – and especially electronic – circuits and equipment. Finally, the electromagnetic fields from the current in a lightning stroke can induce currents and voltage in wire and cables inside a building. Such surge currents are typicall y less intense than direct injection of current, but can easily vaporize integrated circuits in computers, modems, electronic control circuits, etc. Electronic equipment is typically designed to operate in a well -controlled electrical environment. It i s the responsibility of the user to install lighting protection, electrical surge -protective devices, and power conditioning equipment to mitigate the effects of disturbances in the electrical voltage waveform. It is well recognized that the trend toward i ntegrated circuits with more transistors per unit area, and faster switching speeds, makes these circuits more vulnerable to both upset and damage. Damage is a permanent alteration in the physical properties of one or more components, that requires repair or replacement before the equipment can resume normal operation. Examples of lightning damage to electrical 96 177 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 equipment include flashover of insulation insi de motors or transformers, so that the equipment is no longer functional. Examples of lightning damage to electronic equipment includes vaporized traces on printed circuit boards, vaporized transistors and integrated circuits, blown fuses, etc. Anderson Extent Considering the frequency and intensity of Lightning in Anderson County; the future predictability frequency and intensity of Lightning is low to moderate as the entire county is equally susceptible to Lightning and likely to cause low to moderate crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 18 days and 10 event days causing property damage ranging from 1,000 to 100,000 totaling over 5.408 milli on dollars in damage, with 0 deaths and 5 injuries. Storm Events Database Search Results for Anderson County, South Carolina Event Types: Lightning 19 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 1 Number of Days with Event: 18 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 4 Number of Days with Event and Property Damage: 10 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Considering the frequency and intensity of Thunderstorm wind in Anderson County; the future predictability frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to Thunderstorm wind and likely to cause moder ate crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 342 days and 59 event days causing property damage ranging from 1,000 to 500,000 totaling over 4.207 million dollars in damage, with 1 deaths and 15 injuries, with wind speeds ranged from 50 to 75 kts. Storm Events Database 97 178 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Search Results for Anderson County, South Carolina Event Types: Thunderstorm Wind 483 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 2 Number of Days with Event: 342 Number of Days with Event and Death: 1 Number of Days with Event and Death or Injury: 7 Number of Days with Event and Property Damage: 59 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Anderson County has experienced 5 notable Lightning Severe Storms/ Thunderstorms from the time frame of 01/01/1960 through 12/31/2021. A Lightning Severe Storm/ Thunderstorm is considered notable when it causes at or greater than $50,000 in combined property and crop damages. These 5 notable lightning storms/ thunderstorms have caused no injuries to county residents and no fatalities. These notable storms have caused a collective $5.35 million in property damage and $0 in crop damage, adjusted for 2023 inflation. The previous 5 notable occurrences of lightning severe storms/thunderstorm events happened throughout Anderson County, signifying that each area/municipality of the County is equally at risk for another future notable event. 5.5.1 Anderson Lightning Data Year Hazard Location Injuries Fatalities Property Damage Crop Damage 5/25/1996 Lightning Anderson County 0 0 5.000M 0.00K 6/19/1996 Lightning Anderson County 0 0 150.00K 0.00K 7/5/1999 Lightning Anderson County 1 0 0.00K 0.00K 7/6/1999 Lightning Anderson County 0 0 0.00K 0.00K 8/13/1999 Lightning Anderson County 0 0 0.00K 0.00K 6/13/2001 Lightning Anderson County 0 0 0.00K 0.00K 6/25/2001 Lightning Anderson County 0 0 0.00K 0.00K 7/4/2001 Lightning Anderson County 0 0 0.00K 0.00K 8/24/2002 Lightning Anderson County 1 0 0.00K 0.00K 8/25/2002 Lightning Anderson County 1 0 0.00K 0.00K 8/16/2003 Lightning Anderson County 0 0 1.00K 0.00K 7/8/2008 Lightning Anderson Count 0 0 50.00K 0.00K 3/12/2010 Lightning Anderson County 0 0 15.00K 0.00K 98 179 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 3/28/2010 Lightning Anderson County 2 0 5.00K 0.00K 6/15/2010 Lightning Anderson County 0 0 20.00K 0.00K 6/15/2011 Lightning Anderson County 0 0 50.00K 0.00K 8/12/2011 Lightning Anderson County 0 0 100.00K 0.00K 8/12/2011 Lightning Anderson County 0 0 10.00K 0.00K 8/14/2021 Lightning Anderson County 0 0 7.00K 0.00K 5 5.408M Source: NOAA Storm Events Database The previous 5 notable occurrences of lightning severe storms/thunderstorm events happened throughout Anderson County, signifying that each area/municipality of the County is equally at risk for another future notable event. Oconee Extent Considering the frequency and intensity of Lightning in Oconee County; the future predictability frequency and intensity of Lightning is low as the entire county is equally susceptible to Lightning and likely to cause low crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 12 days and 6 event days causing property damage ranging from 5,000 to 80,000 totaling over 751,000 dollars in damage, with 0 deaths and 4 injuries. Storm Events Database Search Results for Oconee County, South Carolina Event Types: Lightning 13 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 1 Number of Days with Event: 12 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 2 Number of Days with Event and Property Damage: 6 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Considering the frequency and intensity of Thunderstorm wind in Oconee County; the future predictability frequency and intensity of Thunderstorm wind is moderate as the entire county is equally susceptible to 99 180 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Thunderstorm wind and likely to cause moderate crop damage, property damage and or death and injury as shown in past occurrences over the past 70+ years with the number of event days being 24 2 days and 41 event days causing property damage ranging from 1,000 to 500,000 totaling over 1.106 million dollars in damage, with 0 deaths and 2 injuries, with wind speeds ranged from 50 to 60 kts. Storm Events Database Search Results for Oconee County, South Carolina Event Types: Thunderstorm Wind 306 events were reported between 01/01/1950 and 01/31/2023 (26694 days) Summary Info: Number of County/Zone areas affected: 2 Number of Days with Event: 242 Number of Days with Event and Death: 0 Number of Days with Event and Death or Injury: 2 Number of Days with Event and Property Damage: 41 Number of Days with Event and Crop Damage: 0 Number of Event Types reported: 1 National Centers for Environmental Information (NCEI) (noaa.gov) Oconee County has experienced 4 notable Lightning Severe Storms/ Thunderstorms from the time frame of 01/01/1960 through 12/31/2021. A Lightning Severe Storm/ Thunderstorm is considered notable when it causes at or greater than $50,000 in combined property and crop damages. These 5 notable lightning storms/ thunderstorms have caused no injuries to county residents and no fatalities. These notable storms have caused a collective $5.35 million in property damage and $0 in crop damage, adjusted for 2023 inflation. 5.5.2 Oconee County Lightning Data 100 181 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 Year Hazard Location Injuries Fatalities Property Damage Crop Damage 3/6/1996 Lightning Oconee County 0 0 75.00K 0.00K 3/16/1996 Lightning Oconee County 0 0 0.00K 0.00K 5/26/1996 Lightning Oconee County 1 0 0.00K 0.00K 7/22/1997 Lightning Oconee County 0 0 0.00K 0.00K 9/21/2000 Lightning Oconee County 0 0 0.00K 0.00K 8/18/2004 Lightning Oconee County 0 0 80.00K 0.00K 4/22/2005 Lightning Oconee County 0 0 1.00K 0.00K 7/27/2008 Lightning Oconee County 0 0 500.00K 0.00K 6/18/2011 Lightning Oconee County 1 0 0.00K 0.00K 8/6/2012 Lightning Oconee County 1 0 5.00K 0.00K 8/6/2012 Lightning Oconee County 0 0 20.00K 0.00K 9/6/2014 Lightning Oconee County 0 0 0.00K 0.00K 7/14/2017 Lightning Oconee County 0 0 70.00K 0.00K 3 751.00K Source: NOAA Storm Events Database 5.6 Tornadoes/ High Winds Background A tornado is a “violently rotating column of air extending from a thunderstorm to the ground” (NOAA). Tornadoes can be extremely violent storms that can have relatively low wind speeds (less than 73 mph) to very high winds in excess of 300 miles per hour. In the South, tornadoes touch down most frequently from the month of March through May (NOAA). Since 1950, there have been numerous tornadoes in South Carolina. The State averages approximately eleven tornadoes a yea r, which ranks twenty -sixth in the nation for tornado strikes. Tornadoes have claimed no casualties in South Carolina, and have injured 3 residents since 1950 (SCEMD). The following Enhanced Fujita Scale for Tornado Damage explains tornado classifications, wind speeds, and a typical damage description of the various categories of tornadoes. Table 5.6.1 Enhanced Fujita Scale 101 182 SECTION 5: HAZARD PROFILES Anderson & Oconee County Multi-Jurisdictional Hazard Mitigation Plan March 2023 . Parameters The seven categories for the EF scale are listed below, in order of increasing intensity. Although the wind speeds and photographic damage examples have been updated, the damage descriptions given are based on those from the Fujita scale, which are more or less still accurate. However, for the actual EF scale in practice, damage indicators (the type of structure which has been damaged) are predominantly used in determining the tornado intensity.[9] Scale Wind speed estimate[10] Frequency[11] Potential damage Example of damage mph km/h EFU N/A N/A 3.11% No surveyable damage. Intensity cannot be determined due to a lack of information. This rating appli

Text truncated. Open the original for the full document.

Source: City of Westminster website. First collected Oct 23, 2026.