Pickens County Council Special-Called Meeting — Agenda Packet
Pickens County · Pickens County · Pickens County Council · meeting of Oct 20, 2025 · Agenda packets
Open the original document More from Pickens County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
222 MCDANIEL AVENUE, B-1 ∙ PICKENS, SC 29671 ∙ 864.898.5856 ∙ WWW.CO.PICKENS.SC.US
COUNCIL MEMBERS
ALEX SAITTA, CHAIRMAN
CHRIS LOLLIS, VICE CHAIRMAN
DALE HOLLOWAY, VICE CHAIR PRO-TEM
C. CLAIBORNE LINVILL
SCOTT LANG
CHRIS BOWERS
COUNTY ADMINISTRATOR
KEN ROPER
CLERK TO COUNCIL
MEAGAN NATIONS
PICKENS COUNTY COUNCIL SPECIAL CALLED MEETING
MONDAY, OCTOBER 20, 2025
6:30 PM
COUNCIL CHAMBERS, COUNTY ADMINISTRATION FACILITY
222 MCDANIEL AVENUE, PICKENS SC 29671
THIS MEETING IS BEING HELD TO CONFORM WITH THE SOUTH CAROLINA FREEDOM OF INFORMATION ACT AND COUNCIL'S ORGANIZATIONAL RULES.
THE PUBLIC HAS BEEN NOTIFIED OF THE DATE, TIME AND PLACE OF THE MEETING. PUBLIC NOTICE AND THE AGENDA WAS PLACED ON THE COUNTY
WEBSITE AND THE BULLETIN BOARD AT THE COUNTY ADMINISTRATION BUILDING AT LEAST 24 HOURS PRIOR TO THE START OF THE MEETING.
1. WELCOME AND CALL TO ORDER:
INVOCATION:
PLEDGE OF ALLEGIANCE:
Chairman Alex Saitta
Councilman Scott Lang
Councilman Scott Lang
2. ORDINANCES FOR THIRD READING AND/OR PUBLIC HEARING:
a) THIRD READING OF AN ORDINANCE FOR CERTAIN AMENDMENTS TO PICKENS COUNTY CODE
OF ORDINANCES RELATED TO THE EFFICIENT, SAFE OPERATION AND MAINTENANCE OF THE
COUNTY ROAD SYSTEM AND MATTERS RELATED THERETO.
b) THIRD READING OF AN ORDINANCE FOR AMENDMENTS TO PICKENS COUNTY CODE OF
ORDINANCES RELATED TO UNSAFE PROPERTY CONDITIONS AND FURTHER CONSOLIDATE
SAID AMENDED ORDINANCES FOR MORE EFFICIENT REFERENCE AND ENFORCEMENT AND
MATTERS RELATED THERETO.
3. OTHER AGENDA ITEMS:
a) FUNDING REQUEST FOR REPLACEMENT AND REPAIR OF THE INOPERABLE PORTION OF THE
DETENTION CENTER CAMERA SYSTEM.
b) COMPREHENSIVE LITTER STRATEGY
4. EXECUTIVE SESSION
a) BOARDS AND COMMISSIONS - SECTION 30-4-70(A)(1)
• APPOINTMENTS TO BOARDS AND COMMISSIONS
5. ACTION ON EXECUTIVE SESSION ITEMS (as needed)
6. ADJOURN
Page 1 of 113
AGENDA ITEM: 11c
PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION
Meeting Date: October 20, 2025
Agenda Item: 2a
Department: Engineering / Roads & Bridges
Prepared By: Rodney Robinson, Director of Public Works
Subject:
Ordinance to remove Article 10 from the UDSO and amend portions of Chapter 32 of the Pickens County Code
of Ordinances.
Summary:
There are two versions of the Road Ordinance which are identified as Article 10 of the UDSO and Chapter 32 of
the Pickens County Code of Ordinances. There are aspects of these two documents that contradict each other,
while there are also sections of both that need updated to coincide with SCDOT standards along with clarifications
of certain specifications. The purpose of this “New Road Ordinance” is two combine aspects of both existing
Ordinances, update standards, and add information on various aspects pertaining to Pickens County roads.
Documents Included:
- Clean Draft of “New Road Ordinance”
- Draft of “New Road Ordinance” including highlights of additions / updates.
Action Requested:
Staff requests Council’s review of amended standards and provide comments.
Staff Recommendation:
Approve amended standards.
Previous Council Action (if any):
Council has approved first and second readings.
Additional Notes:
Staff along with County Attorney are working towards language and procedures to be added for abandonments
such as roadways and surplus property.
Page 2 of 113
STATE OF SOUTH CAROLINA )
) ORDINANCE #_________________
COUNTY OF PICKENS )
AN ORDINANCE PROVIDING FOR CERTAIN AMENDMENTS TO PICKENS COUNTY CODE OF ORDINANCES
RELATED TO THE EFFICIENT, SAFE OPERATION AND MAINTENANCE OF THE COUNTY ROAD SYSTEM AND
MATTERS REALATED THERETO.
WHEREAS Pickens County, South Carolina (the “County”) is a political subdivision of the State of South Carlina and is
thereby authorized to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and general
law of this State, including the exercise of these powers in relation to health and order in counties or respecting any
subject as appears to them necessary and proper for the security, general welfare, and convenience of counties or for
preserving health, peace, order, and good government in them; and
WHEREAS, the County operates and maintains a system of highways, roads, and streets; and the efficient and safe
operations of such highways, roads, and streets requires certain amendments to the County’s existing Code of
Ordinances to further health, peace, order, and good government within the County;
NOW THEREFORE, BE IT RESOLVED that the Pickens County Code of Ordinances be amended as follows:
The provisions of Sections 1010 through 1018 (the road standards portion) of the United Development Standards
Ordinance as amended (the “UDSO”) are herby deleted in their entirety, with language substituted in the relevant section
of the UDSO as follow:
“Section 1010 Streets.
The provisions of Article IV of Chapter 32 of the Pickens County Code of Ordinances as amended (the “Road
Ordinance”) are incorporated herein by reference, and all standards are requirements found in the Road Ordinance shall
be controlling for all determinations necessary under the UDSO relevant thereto.”
The provisions of Section 32-101 is hereby amended as follows:
“Sec. 32-101(c) The County shall be the final authority to approve of disapprove connectivity of new streets or roadways,
whether inside or outside the jurisdiction of the County, to existing streets or roadways within the jurisdiction of County.”
The provisions of Sections 32-151 through 32-155 (Division 4 Roads) of the Pickens County Code of Ordinances are
hereby deleted in their entirety, with the language substituted in the relevant section as follows:
Page 3 of 113
“Sec. 32-151 - Purpose
This division is enacted to provide a means of maintenance of existing roadways which were previously admitted into the
County Road System as that do not meet the requirements of Division 2 herein.
Sec. 32-152 – Restrictions.
On existing dead end roads, at the point the roadway ceases to serve more than one residence or enters solely upon the
property of a single property owner situated at the end of the road, the county will determine the exact termination of
county maintenance. No county maintained roadway may be barricaded in any way and may not be posted with any
type sign such as “private”, “posted”, “keep out” or any other similar sign. The roadway shall remain open at all times for
use by the public at large as to local, state, and federal laws.
Sec. 32-155 – General procedures.
A. Definition. Roadways previously accepted into the county road maintenance system by the then-existing
policy are designated as “minimum maintenance roads”. These roads will be classified separately from all
other roads within the system and all roads accepted through provision of Division 2 herein.
B. Minimum maintenance designation shall remain until such time as the property owners themselves pay the
cost for the improvements needed to meet the requirements of Division 2 herein. The petitioners are solely
responsible for all necessary survey, deeds and costs associated with rights-of-way and agreements.
C. Minimum Maintenance Roads will be of the lowest priority for receiving attention by county maintenance
crews. Expenses for materials and labor shall be kept at a bare minimum.
The provisions of Chapter 32 – Roads and Bridges are hereby amended to include a new section as follow:
“Sec. 32-2 – County Road System
A. Definition. The County shall maintain a written inventory of all public highways, roadways, and streets not
currently maintained by the South Carolina Department of Transportation and not located within any
municipal boundary. Such inventory shall not include any private or private portion of roads.
B. All roads described in inventory referenced above shall comprise the County Road System. Additions or
deletions from the County Road System shall not be allowed except pursuant to provisions of this Chapter.
C. Subsequent to the passage of this Ordinance, the initial inventory of the County Road System shall be
published in a newspaper of general circulation for three (3) successive weeks. This inventory, and any
additions or deletions subsequent thereto, shall be kept in writing, and made available for public inspection
upon reasonable request at the office of the Pickens County Roads and Bridges Department.
Page 4 of 113
The Provision of Chapter 32 – Roads and Bridges are hereby amended as follows:
[PLACEHOLDER FOR UPDATES TO EXISTING ROADS ORDINANCE FROM UDSO DELETED PROVISIONS AND
OTHER AMENDMENTS DEVELOPED DURING COUNCIL MEETING ACTIONS]
Passed and approved, this _____ day of _______________________, 2025
COUNTY COUNCIL OF PICKENS COUNTY
SOUTH CAROLINA
________________________________________
Chris Bowers, Chairman of County Council
Pickens County, South Carolina
(SEAL)
Attest:
_____________________________________________________
Meagan Nations, Clerk of County Council
Pickens County, South Carolina
Page 5 of 113
Roadway Design Standards and Policies
Table of Contents Page
Sec. I Purpose of Roadway Design Standards and Policies 1
Sec. II Standards incorporated by reference. 1
2 (a) Standard Design Specifications. 1
2 (b) Traffic signs and street striping. 1
2 (c) South Carolina DOT standard specifications 1
2 (d) AASHTO design standards. 1
Sec. III Interpretation of standards. 1
3 (a) Governing Standards 1
3 (b) Prior Acceptance of Construction Plans 1
Sec. IV Design exceptions and field changes 1
4 (a) Request for Design Exception 1
4 (b) Field changes 2
Sec. V General design standards 2
5 (a) Suitability of the land 2
5 (b) Conservation. 2
5 (c) Conformance to the comprehensive plan and other adopted plans. 2
5 (d) Name of subdivision or development project. 3
5 (e) Street names. 3
5 (f) Street Addresses 3
5 (g) Blocks. 3
5 (h) Lots. 3
5 (i) Areas reserved for future development 4
5 (j) Plats & Developments Straddling Political Boundaries 4
Sec. VI Required improvements. 5
6 (a) Minor subdivisions. 5
6 (b) Major subdivisions, multi-family and nonresidential developments. 5
Sec. VII Guarantee in lieu of completed improvements. (2/16/10) 5
7 (a) Performance Surety 5
7 (b) Performance Surety Default 6
Table 10.1 6
Sec. VIII Survey Monuments 7
8 (a) Exterior development boundaries. 7
8 (b) Lot and street corners. 7
8 (c) Floodplain Elevations 7
Sec. IX Easements. 7
9 (a) Utility easements. 7
9 (b) Pedestrian Easements 7
Page 6 of 113
9 (c) Drainage and access easements 7
9 (d) Conservations easements. 8
9 (e) Overlapping easements 8
Sec. X Streets 8
10 (a) Access. 8
10 (b) Street classifications.
10 (c) Traffic Study Policy 8
10 (d) Relation to present and future street system. 9
10 (e) Design standards for streets. 9
Table 10.2: Minimum Right-of-Way Width 10
Table 10.3: Street Grades and Design Speed 11
Figure 10.1 Horizontal Curves 11
Figure 10.2 Reverse Curves 11
Table 10.4 Intersection Offset 12
Figure 10.3 Intersection Offsets 12
Figure 10.4 Mitered Right-of-Way 13
Table 10.5: Minimum Sight Distance 13
Figure 10.5 Sight Distance 14
Figure 10.6 Interim Turn-Arounds 14
Figure 10.7 Cul-de-sac Dimensions 15
Figure 10.8 Subsurface Drainage 17
Figure 10.9 Entry Island Layout 17
Figure 10.10 Island Detail 18
Figure 10.11 Intersection/Driveway Grades 19
10 (f) Street Improvements 19
Table 10.6: Street Base and Pavement 20
Figure 10.12 Guardrail Cross Section 22
10 (g) Substandard streets. 22
10 (h) Street Abandonment 22
Sec. XI Private residential access. 23
12 (a) Shared driveways. 23
12 (b) Common drive. 24
12 (c) Private Roads. 25
Sec. XII Street signs, traffic signs and striping. 25
13 (a) Street name signs. 25
13 (b) Traffic Signs 25
13 (c) Striping Requirements 26
Sec. XIII Street Lights 26
Sec. XIV Driveway and Development entrances. 26
15 (a) Driveway access to a State road. 26
15 (b) Driveway access to major County roads. 26
Page 7 of 113
15 (c) Driveway standards; in general. 26
15 (d) Residential subdivision entrances. 27
15 (e) Commercial/Industrial subdivision entrances 27
15 (f) Driveways for multi-family and non-residential developments. 27
15 (g) Maintenance of sight distances 27
Sec. XV Deceleration lanes and turn lanes. 27
16 (a) Deceleration lanes; where required. 27
16 (b) Median breaks. 28
16 (c) Deceleration and turn lane constructions standards. 28
Sec. XVI Sidewalks. 28
17 (a) Sidewalks; where required. 28
17 (b) Sidewalks; where located. 28
17 (c) Sidewalks; construction. 28
Sec. XVII Location of utilities and street cuts. 29
18 (a) Location of utilities in streets. 29
Sec. XVIII Storm drainage 29
19 (a) Applicability and exemptions 29
19 (b) Standards to be used in designing system: 30
Sec. XIX Public water system. 31
Sec. XX Public sewerage system. 32
Page 8 of 113
BLANK PAGE
Roadway Design Standards and Policies
Page 9 of 113
Sec. I Purpose of Roadway Design Standards and Policies
This Article establishes the comprehensive standards and procedures governing the design, construction, acceptance,
classification, maintenance, and abandonment of all public and private roadways, streets, and related infrastructure within
Pickens County. It is intended to serve as the unified and controlling authority for all roadway matters under County
jurisdiction, ensuring safe, consistent, and coordinated development and management of the County’s transportation
network.
Additionally, this a rticle sets out the minimum requirements and standards for construction of subdivisions and other land
development projects, including general principles of design and layout and requirements for such public facilities as street s
and utilities.
Low impact development procedures may be used where practical. Grass swales, pervious pavements and other best
management procedures may be used where storm water velocities and quantities allow. Each low impact practice will be
approved on a case-by-case basis.
Sec. II Standards incorporated by reference.
2 (a) Standard Design Specifications.
The Standard Design Specifications of Pickens County, also referred to in this Ordinance as “Standard Details,” as adopt ed
by the County Council and as may be amended from time to time are incorporated into this Ordinance as though set forth
within the body of this Ordinance. In the case of a conflict between the Standard Design Specifications and the text of this
Ordinance, the text shall control.
2 (b) Traffic signs and street striping.
The installation of all traffic control signs and street striping shall be governed by the standards contained in the Manual on
Uniform Traffic Control Devices, latest edition, published by the Federal Highway Administration of the U.S. Department of
Transportation.
2 (c) South Carolina DOT standard specifications.
Unless otherwise specially set forth in this Ordinance or the Standard Design Specifications of Pickens County, all of the
materials, methods of construction, and workmanship for the work covered in reference to street construction and storm
drainage construction shall conform to the latest standard specifications of the South Carolina Department of Transportation.
2 (d) AASHTO design standards.
Design criteria and standards not specifically set forth herein shall conform to the latest edition of the AASHTO Policy on
Geometric Design of Highways and Streets.
Sec. III Interpretation of standards.
In the interpretation and application of the provisions of these standards, the following shall govern:
3 (a) Governing Standards
Whenever a provision of these standards or any provision in any law, ordinance, resolution, rule, or regulation of any kind
contains any restrictions covering any of the same subject matter, the standards that are more restrictive or impose higher
standards or requirements shall govern.
3 (b) Prior Acceptance of Construction Plans
Pickens County shall not modify or alter any development plans that have been filed with and accepted by the County prior
to the effective date of this code. This exception shall be subject to the conditions and limitations under which said plans
were accepted by the County.
Page 10 of 113
Sec. IV Design exceptions and field changes.
4 (a) Request for Design Exception
When unique conditions and circumstances exist on a project, the developer’s engineer may submit a request for design
exception in a format provided by the County Engineer. Design exceptions request should be identified as early as possible
during the design process. The County Engineer is the approval authority for design exceptions. Any design exception
request not considered by the County Engineer, or otherwise not approved, may be forwarded to the Planning Commission
for their review and consideration.
4 (b) Field changes
Minor changes in construction plans caused by field conditions shall be made at the direction of the County Engineer with the
cost of such changes to be paid by the developer. All changes are to be documented as revisions to the approved
development plans and correctly shown on the as-built surveys. Discrepancies between the as-built surveys and the
approved development plans may result in delays in approving final plats or certificates of occupancy.
Sec. V General design standards.
5 (a) Suitability of the land.
(1) Land physically unsuitable for subdivision or development because of flooding, poor drainage, topographic, geologic or
other such features that may endanger health, life or property, aggravate erosion, increase flood hazard, or necessitate
excessive expenditures of public funds for supply and maintenance of services shall not be approved for subdivision or
development unless adequate methods are formulated by the developer for solving the problems. Such land shall be set
aside for such uses as shall not involve such a danger.
(2) Land within a proposed subdivision or development which is unsuitable for development shall be incorporated into the
buildable lots as excess land or may be utilized as open space. Lots that do not comply with the requirements of this
Ordinance are prohibited.
5 (b) Conservation.
(1) Development shall be planned, designed, constructed and maintained to avoid substantial probabilities of:
a. Accelerated erosion.
b. Pollution, contamination, or siltation of lakes, rivers streams, and other water bodies.
c. Damage to vegetation.
d. Injury to wildlife and fish habitats.
(2) Development shall be planned, designed, constructed and maintained to provide open space and to create a man -made
environment for human use or occupancy compatible and harmonious with the natural environment and specific
consideration shall be given to the preservation of natural topography, to preservation of existing vegetation, to retention of
major land forms and to preservation of important vistas.
5 (c) Conformance to the comprehensive plan and other adopted plans.
In addition to the requirements established herein, all subdivisions and individual development projects shall comply with th e
following laws, rules and regulations:
(1) All proposed subdivisions and individual development projects shall conform to the Comprehensive Plan and
development policies in effect at the time of submission to the Planning Department.
(2) All highways, major thoroughfares, streets and other transportation facilities shall be platted by the developer in the
location and to the dimension indicated on the Comprehensive Plan or the County Transportation Plan, if applicable,
whichever is the most recently adopted or amended.
Page 11 of 113
(3) When features of other plans adopted by the County Council (such as school sites or other public -building sites, parks or
other land for public uses) are located in whole or in part in a subdivision, such features shall be either dedicated or rese rved
by the subdivider for acquisition within a reasonable time by the appropriate public agency.
a. Whenever a plat or site plan proposes the dedication of land to public use that the County Council finds
to be not required or suitable for such public use, the County Council shall refuse to accept the dedication.
(4) In subdivisions or developments related to or affecting any State or U.S. numbered highway, the Planning Department
shall require the approval of the South Carolina Department of Transportation.
(5) Any and all rules of the South Carolina Department of Health and Environmental Control (DHEC), the USDA Natural
Resource Conservation Service, and all other appropriate state and federal agencies.
5 (d) Name of subdivision or development project.
The name of each subdivision or development project must have the approval of the Planning Department. The name shall
not duplicate nor closely approximate the name of an existing subdivision or development project in Pickens County or any of
its cities.
5 (e) Street names.
(1) Street names.
a. Proposed streets obviously in alignment with other existing and named streets shall bear the names of the
existing streets. In no case shall the name for a proposed street duplicate existing street names in Pickens County.
b. Street names are subject to approval by the E911 Addressing Coordinator.
5 (f) Street Addresses
Street addresses shall be obtained from the E911 Addressing Coordinator and shall be shown upon each final plat. Numbers
must be visible from the street. The size of the address numbers must be a minimum of three (3) inches tall.
5 (g) Blocks.
1) Residential Blocks.
Unless otherwise approved by the County Engineer under unusual circumstances, block lengths shall not exceed twelve
hundred (1,200) feet nor be less than four hundred (400) feet in length.
a. In blocks greater than 1,200 feet in length, the County Engineer may require one or more public easements of not
less than twenty (20) feet in width to extend entirely across the block for pedestrian crosswalks, fire protection or
utilities.
b. Width: Blocks shall be wide enough to allow two rows of lots, except where reverse frontage lots on major
thoroughfares are provided, or when prevented by topographic conditions or size of the property, or for lots along
the periphery of the subdivision, or where abutting upon limited access highways or railroads, or where other
situations make this requirement impractical, in which case the Planning Department and County Engineer may
approve a single row of lots.
2) Nonresidential Blocks.
Blocks for other than residential use shall be of such length and width as may be suitable for the prospective use, including
adequate provision for off-street parking and service.
5 (h) Lots.
(1) Minimum lot dimensions and areas.
All lots shall meet or exceed the area and dimensional requirements of this Development Ordinance.
(2) Authority of DHECSCDES.
Nothing contained in this Article shall be construed as preventing the DHECSCDES, after study of the conditions existing in a
proposed subdivision, from requiring that all or any portion of the area of such subdivision shall not be built upon or that the
Page 12 of 113
minimum lot sizes set forth in this Development Ordinance are inadequate and must be increased to ensure the protection of
the public health.
(3) Adequate building sites.
Each lot shall contain a site large enough for a normal building that will meet all building setback requirements as set forth in
this Ordinance and not be subject to flood or periodic inundation .
(4) Arrangement.
If possible, all lot lines that intersect a street line shall be perpendicular or radial to said street lines unless not prac tical or
desirable because of topographic or other features, such as the location of a stream or other natural feature that more
appropriately may define a lot, or a property line that forms the periphery of a subdivision that is not perpendicular or radia l to
a street line. Exceptions to this requirement must be approved by the Director of Community Development at the time of
Preliminary Plat approval or otherwise prior to recordation of the lot. In no case shall a lot be created that would require a
variance to provide an adequate area to accommodate a normal principal building.
(5) Corner Lots.
Corner lots shall be sufficiently large to permit the location of buildings so as to conform to the front building lines on b oth
streets.
(6) Through lots.
Except where specifically required to provide reverse frontage separation from a County road or a State or U.S. numbered
highway, or to overcome specific disadvantages of topography and orientation of property, through lots (i.e., “double -
frontage” lots) are to be avoided.
5 (i) Areas reserved for future development
If any portion of a tract is reserved for future subdivision development, the minimum lot width and frontage of the reserved
area may be reduced to the width required for a future street to serve such area.
(1) Such a reserved area must be labeled “Reserved for Future Development” on the final subdivision plat, and the portion of
the lot where a street will be built must be labeled “Future Street.”
(2) Such a reserved area will not be eligible for issuance of a building permit unless the lot meets all requirements of thi s
Development Ordinance, including minimum lot width and frontage requirements.
5 (j) Plats & Developments Straddling Political Boundaries.
Page 13 of 113
Whenever access and/or services to a subdivision is required across land in another governmental jurisdiction, the Planning
Department may request assurance from the County Attorney, and/or the other county, and/or other municipality that access
is legally established, and that the access road is adequately improved. In general, lot lines shall be laid out so as to not
cross jurisdictional boundary lines. Any necessary intergovernmental agreements must be executed prior to the issuance of a
Development Permit. The developer and/or property owner has an affirmative duty at the time of application for land use
approval or development permit (if land use approval has already granted or not required) application to request with the
affected governments that they enter into an intergovernmental agreement process. The County makes no guarantee to
enter into any intergovernmental agreement.
Sec. VI Required improvements.
6 (a) Minor subdivisions.
By definition, a minor subdivision does not involve the construction of major public improvements, such as new streets or
stormwater detention. However, the following improvements are required in order to adequately serve the lots and protect the
safe operation of the existing road:
1) Right-of-way shall be delineated along the property’s frontage from the centerline of the existing road equal to ½ of the
minimum requirement for the classification of the road, as established in this Article or otherwise specified by SCDOT.
2) The potential location of a driveway connection serving each lot and meeting the requirements of these development
regulations shall be indicated on the final subdivision plat.
3) The stormwater carrying capacity of the road, whether in an existing ditch or gutter, shall not be compromised. If the
stormwater characteristics of the existing road are inadequate to accommodate the new lots, the County Engineer may
require improvement of the roadway ditch as appropriate.
4) All lot corners shall be marked according to the Minimum Standards Manual for the Practice of Land Surveying in South
Carolina.
6 (b) Major subdivisions, multi-family and nonresidential developments.
The following improvements shall be provided by the developer or at the developer’s expense in every major subdivision or
individual multi-family or nonresidential development in accordance with the requirements and standards contained in this
Article.
(1) Survey monumentation in accordance with Sec. 1008.
(2) Streets providing access to such a development and to all lots in such a subdivision, including the extension of streets
required to provide access to adjoining properties, in accordance with Sec. 1010.
a. Streets contained wholly within such a subdivision shall be improved to the full standards contained in
this Article.
b. Curb and gutter as required by Sec. 1010(e)(4).
(3) Street name signs, stop bars, striping and traffic control signs as approved by the County shall be paid for by the
developer and installed by the Pickens County Roads and Bridges Department developer in accordance with Sec. 1013.
(4) Driveway access to each lot, and project access improvements (deceleration, turn lanes, etc.) as deemed necessary by
the County Engineer under the provisions of Sec. 1015 and Sec. 1015.
(5) Sidewalks, if required under Sec. 1017.
(6) Storm water drainage and detention facilities in accordance with Sec. 1019. (7) Public or private water supply as
required under Sec. 1020.
(8) Public or private sanitary waste disposal as required under Sec. 1021.
Sec. VII Guarantee in lieu of completed improvements. (2/16/10)
7 (a) Performance Surety
Page 14 of 113
No final subdivision plat shall be approved by the County or accepted for recordation by the Register of Deeds, nor shall any
lot within the development be sold or transferred until one of the following conditions has been met:
(1) All public improvements shall have been properly installed and completed in accordance with all requirements and
standards of this Development Ordinance and an as-built survey of the improvements shall have been approved by the
County Engineer; or,
(2) Pickens County has received a performance surety in the form of a letter of credit or surety bond issued by a financial
institution with a presence in South Carolina or otherwise licensed to provide such services in South Carolina in the amount
of 125% of the estimated cost of installation of the required improvements.
(3) For residential developments, the improvements funded through the performance surety shall be limited to final
pavement topping for streets, storm drainage infrastructure, curbing, grassing of street shoulders, landscaping, and street
striping.
For commercial or industrial developments with public infrastructure, it must cover the base, asphalt, grading, storm
drainage.
(4) The developer shall submit actual cost estimates prepared by the developer’s engineer, contractor, or subcontractors to
the Planning Department. The Planning Department, along with the County Engineer, will perform a cost analysis for such
infrastructure covered under any proposed surety. If such analysis generates a higher estimate than the estimates submitted
by the developer, the higher of the two estimates will be used to determine the bond amount.
(5) Completion of the improvements covered under the performance surety shall be accomplished within twelve (12) months
of the approval of the final subdivision plat.
(6) Upon completion of any deferred improvements:
a. The as-built plans are to be updated by the developer and submitted to the County Engineer;
b. A letter from the County Engineer authorizing the release of the surety shall be provided;
c. A maintenance surety required under Sec. 1102(e) shall commence for the completed deferred
improvements.
7 (b) Performance Surety Default
If at any point in the schedule shown in Table 10.1, below, the County Engineer determines that the installation of
infrastructure is not progressing as outlined in the schedule or that the developer is not working in good faith to bring the
infrastructure to County standards, the County may declare the developer in default and can proceed to secure the proceeds
of the surety in order to complete the installation of the infrastructure.
Page 15 of 113
Sec. VIII Survey Monuments
8 (a) Exterior development boundaries.
(1) An iron pipe or ½–inch iron pin at least twenty-four (24) inches long shall be placed at all corners of the exterior
boundaries of the subdivision or development project being developed. (2/16/10)
(2) Existing permanent monuments that, in the professional opinion of a registered land surveyor, are of sufficiently durabl e
construction shall be marked and maintained.
(3) Other, more suitable permanent materials may be used as noted in the Standards of Practice Manual for Surveying in
South Carolina, if such material provides for a permanent reference. (2/16/10)
8 (b) Lot and street corners.
(1) All other street or lot corners shall be marked with an iron pipe or ½ –inch iron pin at least twenty-four (24) inches long.
(2/16/10)
(2) All such monuments shall be properly set in the ground and shall be approved by a registered land surveyor prior to the
time of final plat approval.
(3) Other, more suitable permanent materials may be used as noted in the Standards of Practice Manual for Surveying in
South Carolina, if such material provides for a permanent reference. (2/16/10)
8 (c) Floodplain Elevations
On developments containing floodplains, flood elevation references shall be set and noted on all plans and associated plats.
Sec. IX Easements.
Page 16 of 113
Easements shall be required in connection with subdivisions or developments for the following purposes, among others:
9 (a) Utility easements.
(1) Utility easements for private utilities shall be avoided except in cases where no other satisfactory arrangements can be
provided for the installation of private utilities.
(2) Whenever it is necessary or desirable to locate a public utility line outside of the street right -of-way, the line shall be
located in an easement dedicated to the County (or other appropriate public entity) for such purpose. Easements for water
and sanitary sewers shall be a minimum of 20 feet wide, and may be required to be wider depending on the depth of cut to
maintain a 1:1 open cut slope. When warranted, temporary construction easements widths shall be as required by the
County.
(3) Easements for sanitary sewers may be required by the County Engineer or public sewage provider for future extension of
lines, whether or not the subdivision or development is currently proposed to be served by public sewer.
9 (b) Pedestrian Easements
Pedestrian easements not less than ten (10) feet wide, may be required where deemed essential to provide circulation, or
access to schools, playgrounds, shopping centers, transportation, and other community facilities.
9 (c) Drainage and access easements.
(1) Drainage easements shall be cleared and opened for a closed stormwater or drainage system of adequate width and
capacity at the time of development to control surface water run -off. Run-off slopes and side slopes shall be specified by the
developer’s engineer according to good engineering practices.
(2) A publicly dedicated drainage easement is to be provided along any manmade drainage channel or drainage pipe
located outside a street right-of-way. All easements shall be no less than twenty (20) feet wide when used as an open ditch.
Piped storm drainage shall have a minimum easement width of twenty (20) feet wide.
(3) Drainage easements off the street right-of-way shall be clearly defined on the plat and deed of the individual property
owner, and such property owner shall keep the easement free of obstructions and maintain that part of the easement within
the property owner’s boundary line so that free and maximum flow is maintained at all times. The property owner shall not
alter any drainage improvements without the prior written approval from the County.
9 (d) Conservations easements.
Conservation easements, as may be required by this Development Ordinance shall be clearly defined on the plat and deed
of the individual property owner, and must conform to the requirements set out for such easements
9 (e) Overlapping easements.
Easements for water, sanitary sewers and drainage purposes may be combined, but must be a minimum of thirty (30) feet if
in combination. Any easement containing more than one pipe must provide at least 10 feet beyond the pipe and the pipes
must be at least ten (10) feet apart (measured on center). Wider easements shall be required when necessary to maintain a
1:1 open cut slope to each pipe.
Sec. X Streets.
10 (a) Access.
(1) A publicly approved street meeting the requirements of this Article shall serve every development and every lot within a
subdivision. Private streets, when constructed and approved according to Section 1010(c), are permitted.
(2) Every development and every major subdivision shall have access to the public street system via a standard County
road or an approved private street. A building permit shall not be issued unless continuous road access between the property
and the public street system is provided by a publicly dedicated street or an approved private street.
(3) A building permit shall not be issued on any property that does not front on or have approved access to a publicly
dedicated street or an approved private street, in accordance with the minimum lot frontage and access easement provisions
of this Development Ordinance.
Page 17 of 113
(4) When land is subdivided into larger parcels than ordinary building lots, such parcels shall be arranged and designed so
as to allow for the opening of future streets and to provide access to those areas not presently served by streets.
(5) No subdivision or development shall be designed in a way that would completely eliminate street access to adjoining
parcels of land.
(6) Reserve strips which control access to streets, alleys and public grounds shall be prohibited unless their control is pl aced
in the hands of the County under ownership, dedication, or easement conditions approved by the County Attorney and the
County Engineer.
(7) Subdivision streets that intersect a State or U.S. numbered highway, a County arterial or County collector road shall do
so at intervals of not less than five hundred (500) feet, or as required by the South Carolina Department of Transportation,
whichever is greater. On all other roads, at least two hundred fifty (250) feet must separate street intersections on the same
side of the road, measured centerline to centerline. Compliance with sight distance requirements of this Development
Ordinance may require greater distances between street intersections.
10 (b) Street classifications.
Streets are classified according to the function that they serve, the type, speed, and volume of traffic they will carry and the
required standards of design. The classifications of streets and roads are as follows:
(1) Principal Arterials.
These roads, which include interstates and rural freeways: serve "substantial" statewide or interstate trips, as defined by h igh
mileage or volume; connect most urban areas of twenty-five thousand (25,000) or more and virtually all urban areas of fifty
thousand (50,000) or more; and provide an integrated network without stub connections except where geography dictates
otherwise.
(2) Minor Arterials.
With the principal arterial system, these roads form a rural network that links other cities, larger towns, and other traffic
generators, such as major resort areas, capable of attracting travel over long distances; links all developed areas of the
state; and serve corridors with trip lengths and travel density greater than those predominantly served by rural collector or
local systems. Minor arterials therefore constitute routes whose design should be expected to provide for relatively high
overall travel speeds, with minimum interference to through- movement.
(3) Major Collectors. These roads, with minor collectors, primarily serve the county rather than state traffic. Consequently,
more moderate speeds are typical. They serve any county seat or larger town not on an arterial route, and other traffic
generators of equivalent intra county importance, such as consolidat ed schools, shipping points, county parks, and important
mining and agricultural areas; link the latter places with nearby larger towns or cities, or arterials and freeways; and serv e the
more important intra county travel corridors.
(4) Minor Collectors.
Serving county-wide traffic, these roads should evenly collect traffic from local roads and bring all developed areas within a
reasonable distance of a collector road; provide service to the remaining smaller communities; and link the locally important
traffic generators with the hinterland.
(5) Local Roads.
These roads serve primarily to provide access to adjacent land and serve low - mileage trips as compared to collectors or
other higher systems. Local roads constitute the rural mileage not classified as part of the principle arterial, minor arteri al, or
collector systems.
10 (c) Traffic Study Policy
(1) Overview.
Under the current wave of growth Pickens County is experiencing, one of the greatest causes of concern is the
traffic impact these various projects have and will continue to have on our community. There are frequent calls for
a developer to do a “traffic study”. In an effort to standardize when a study is required, what type or types of studies
are required, the geographic range of the study and how far into the future the study should consider traffic patterns,
Page 18 of 113
the County is proposing a Traffic Study Policy which will define these terms and automatically trigger the appropriate
traffic research on a case-by-case basis.
(2) Purpose.
The purpose of the Pickens County Traffic Study Policy is to standardize the requirements for various development-
related traffic studies in Pickens County. By establishing a set of metrics tied to best practices and commonly
accepted data, the decision to require or not require a traffic study shall be made based on empirical data.
(3) Triggers for a traffic study being required.
The following chart shows the type and scope of traffic studies required for various projects:
Development
trips/day generated
Traffic Impact
Analysis
Traffic Circulation
Analysis
Traffic
Volume Study
Speed
Study
Origin &
Destination Study
Traffic
Capacity Study
0-500 None1 None1 None1 None1 None1 None1
501-1000 Required None1 None1 None1 None1 Required
1001-1250 Required Required None1 None1 None1 Required
Greater 1250 Required Required Required Required Required Required
1 Unless a development has a single entrance on an existing road that has previously had a traffic volume study that
stated that the road was at capacity after previous development and would require structural changes to accommodate
additional traffic flow.
(4) Required Actions and Range of Study Based on Triggers:
Development
trips/day generated
Peak Hour
Calculation
Un-signalized
intersection range
Signalized Intersection
range
Future Time
Horizon
Traffic Capacity
Study
0-500 Yes
501-1000 Yes ¼ mile Nearest Commuter Corridor 10 years 1 mile
1001-1250 Yes ½ mile Nearest Commuter Corridor 15 years 1.5 miles
Greater 1250 Yes 2 miles Nearest Commuter Corridor 20 years 2 miles
(5) Trip Generation - Trip Generation calculations shall follow the most current Edition of the ITE (Institute of
Transportation Engineers). At the time of adoption of this policy the most current edition is the Eleventh
(11th).
(6) Roadway/Paving Impact Analysis:
Based on the outcome of the studies outlined above, the County Engineer shall review the data and make a
recommendation regarding, but not limited to:
Page 19 of 113
Roadway Design Standards and Policies
Pickens County
• Roadway widening
• Addition of travel lanes
• Acceleration, deceleration, turning, or queuing lanes
• The addition or removal of sidewalks
• The addition or removal of bust stops
• Curb/stormwater management work
• Intersection signage including full signalization
• Other signage as necessary
• Parking study
• Addition of bike lanes or multimodal pathways
(7) Notes and Addendum
The County reserves the right to require traffic studies based on unique factors specific to a particular project or
location.
(8) Defintions
Average Daily Trips - Average Daily Trips (ADT} are the total number of trips, both in-bound and out-bound, within
a 24 hour weekday period, generated by a particular use or development.
Pass-By Trip - Trips generated by the proposed Project that would be attracted from traffic passing the proposed
project site on an adjacent street that contains direct access to the Project.
Peak Hour Trip - Peak Hour Trips are vehicle trips, both in -bound and out -bound, occurring during a one hour
period either during the AM Peak (7AM to 9AM} or the PM Peak (4PM to 6PM}, generated by a particular use or
Project.
Project - A Project subject to this policy encompasses all land use development projects affecting the built
environment, including changes in occupancy or intensification of existing uses, over which the City has
administrative or legislative authority, that require review and approval and issuance of a building permit, certificate
of occupancy, or other land use approval by County staff, Commissions, or Council.
Traffic Count - A traffic count is a count of traffic along a particular road, either done a digital counter (hose),
electronically via photography and OCR technology, or by human counters.
Traffic Impact Analysis (TIA) – A TIA is provided to assess the near -term and long -term effects of specific
development activity on the roadway system in a comprehensive manner. Development activity may include
rezoning, platting, development plan approvals, Thoroughfare Plan amendments, and annexations.
Traffic Circulation Analysis (TCA) – A TCA is provided to determine how a development's traffic relates to existing
traffic on internal and adjacent roadways. A TCA can be required during the same stages of the development
process as a TIA, or it can be re quired at the time of building permit, driveway permit, development plan, or
certificate of occupancy. A TCA is smaller in scope and magnitude than a TIA and focuses primarily on localized
impacts.
Traffic Volume Study - Traffic volume studies are conducted to determine the number, movements, and
classifications of roadway vehicles at a given location. The data helps to identify critical flow time periods,
determining the influence of large vehicles or pedestrians on vehicular traffic flow.
Speed Study - Spot speed studies are conducted to estimate the distribution of speeds of vehicle in the traffic
stream at a particular position on highway. This is done by recording the speeds of vehicle at the specified location.
Origin and Destination Study - An origin-destination study is used to determine travel patterns of traffic on an
installation during a typical day. This is a study to determine and analyze trips. Trips are defined as one -way
movement, from where a person starts (origin) to where the person is going (destination).
Page 20 of 113
Roadway Design Standards and Policies
Pickens County
Traffic Flow Characteristics - Traffic flow is the study of the movement of individual drivers and vehicles between
two points and the interactions they make with one another.
Traffic Capacity Study - A traffic capacity study is done to determine the maximum number of vehicles in a lane or
a road that can pass a given point in unit time per hour per lane or roadway. The traffic capacity indicates a
capability or maximum rate of flow with a certain level of service characteristics that can be carried by the road.
The traffic capacity of a roadway depends upon a number of prevailing roadways and traffic conditions.
Parking Study - A parking study is defined as the ratio of number of bays occupied in a time duration to the total
space available. It gives an aggregate measure of how effectively the parking space is utilized.
Roadway/Paving Impact Analysis - This is recommended by the County Engineer to determine the ability of a
given section of roadway to handle any proposed increase of various types of traffic based upon a proposed
development.
10 (d) Relation to present and future street system.
(1) The street pattern within a development or subdivision shall provide for the continuation or appropriate projection of t he
existing street pattern or anticipated development, if any, at the same or greater width, but in no case less than the requir ed
minimum width. Topography, natural features such as streams and tree growth shall be considered.
(2) Existing streets that adjoin a development or subdivision boundary shall be deemed a part of the subdivision. T he
proposed street system within a subdivision shall have the right -of-way of existing streets extended no less than the required
minimum width. Subdivisions that adjoin only one side of an existing street shall delineate one -half of the additional right-of-way
needed to meet the minimum width requirement for the street. If any part of the subdivision includes both sides of an existing
street, all of the required additional right-of-way shall be delineated.
(3) If the County desires the roadway to be improved to a standard greater than that for a local residential rural
roadway, Pickens County shall provide or pay the cost of the additional materials and labor.
(4) All right-of-way required for off-site improvements shall be acquired by the developer at no expense to Pickens County. If the
Developer is unable to acquire the right-of-way, the Pickens county attorney shall initiate acquisition proceedings, at the expense
of the developer, after authorization by the Pickens County Council
(5) Where, in the opinion of the County Engineer, it is necessary to provide for inter - parcel access to adjoining property,
proposed streets shall be extended by delineation of right -of-way to the boundary of such property and existing streets through
the development.
(6) Subdivisions shall be laid out so as to discourage through traffic on local streets.
However, the provision for the extension and continuation of arterial and collector streets into and from adjoining areas is
required.
(7) Where a subdivision abuts or contains an existing or proposed arterial street, the County Engineer shall require margina l
access streets, single tier lots, or such other treatment as will provide protection for abutting properties, reduction in th e number
of intersections with the arterial street, and separation of local and through traffic.
(8) Where no street exists or where the adjoining property is in alignment with a proposed street, a temporary turnaround sh all
be provided at the boundary of the property.
10 (e) Design standards for streets.
(1) Arterial Streets.
All State or U.S. numbered highways shall meet all design requirements of and be approved by the South Carolina Department
of Transportation. All County arterials that are not State or U.S. numbered highways shall meet all design requirements of th is
Development Ordinance.
(2) Local and Collector Streets.
All local and collector streets shall comply with the design and construction requirements of this Development Ordinance, except
that all State or U.S. numbered highways and roadways shall meet all design requirements of and be approved by the South
Formatted: Font: Bold, Highlight
Page 21 of 113
Roadway Design Standards and Policies
Pickens County
Carolina Department of Transportation. Traffic calming devices, when warranted (see appendix for Speed Bump Ordinance –
Sec. 32-114), shall be installed in all residential and commercial developments. The County Engineer must approve the
installation of any calming device.
(3) Minimum width of right-of-way. Minimum width of right-of-way measured from lot line to lot line shall be as shown on Table
10.2. Additional right-of-way may be required to accommodate turn lanes, deceleration lanes or other road improvements.
(4) Additional Right-of-Way.
a. Subdivisions which include an existing street that does not conform to the minimum
right-of-way requirements of this Ordinance shall provide additional width along one or both sides of such
street or road so that the minimum right-of-way required by this Article is established if lots front on the
existing street. Subdivisions abutting only one side of such a street or road shall provide a minimum of one -
half of the right-of-way required by these regulations measured from the center of the existing right -of-way.
b. When a future street or road, as proposed in the Comprehensive Plan or otherwise delineated by County
Council, adjoins or traverses the subdivision or development project, the future right -of-way shall be platted
as part of the subdivision or development project. No development will be allowed within the platted future
right-of-way except for drives and landscaping, and the platted future right -of-way is to be treated as a lot line
for the provision of all setback lines as required by this Article.
c. When warranted by topography or other utility placement, on local residential streets with a fifty (50) foot
right-of-way, additional property for a permanent utility maintenance easement shall be established adjacent
to the right-of-way.
(5) Vertical alignment of streets.
a. All streets shall have a minimum centerline grade of one half percent )0.51%) for curb & gutter sections.,
and one third percent 0.33% for ditch sections. . Minimum grade on a cul-de-sac shall be one percent (1%).
b. Minimum design speeds and maximum grades for proposed streets by street classification shall be as
shown on Table 10.3. Design exceptions must be justified and approved by the County Engineer.
c. Vertical curves intersecting tangents of less than 10% shall use a ‘K” factor of
16 for a crest vertical curve and a factor of 24 for a sag vertical curve. This shall be valid for a speed limit of
twenty- five miles per hour or less. Center- line tangents intersecting greater than 10% shall be approved by
the County Engineer on a case by case basis, with sight distances being the major determining factor.
Page 22 of 113
Roadway Design Standards and Policies
Pickens County
(6) Horizontal alignment of streets.
a. See SCDOT Design Manual – Chapter 5 – for minimum radii on horizontal curves.
b. Reverse curves in the street right-of-way should be avoided but may be approved by the County engineer at
his discretion (see Figure 10.2)
c. Street jogs shall have a centerline offset of no less than as shown in the following table and figure:
Page 23 of 113
Roadway Design Standards and Policies
Pickens County
d. Intersections. All streets shall intersect at no less than seventy -five (75) degrees, and as near a right angle
as possible. The angle of intersection is to be measured at the intersection of
the street center- lines. Such intersecting streets shall provide an uninterrupted line of sight from the center
point of the inter- section for not less than the minimum sight distance required in accordance with this
Development Ordinance.
e. Multiple intersections involving the junction of more than two streets shall be prohibited unless otherwise
approved by the County Engineer.
f. Curb lines at street intersections shall have a radius of curvature of not less than twenty -five (25) feet. Where
the angle of street intersection is less than ninety (90) degrees, a longer radius may be required.
g. Intersecting street right-of-way lines shall parallel the back of curb of the roadway, and shall be mitered
twenty (250) feet along both streets from the point of the right-of-way lines projected to their intersection.
See Figure 10.4.
(7) Minimum sight distance.
a. Sight distance requirements at intersections and driveways shall be as shown on Table 10.5. In general, the
sight distance requirement is based on a passenger car entering a two-lane highway and shall be adjusted if
the development typically uses larger vehicles or is entering a highway with more than two lanes. See
SCDOT ARMS manual for further guidance.. equal to 10 times the posted speed limit or is equal to the
latest SCDOT adopted standard.
Page 24 of 113
Roadway Design Standards and Policies
Pickens County
Table 10.5: Minimum Sight Distance
Intersection Sight Distance, Vehicles Approaching from the Left and For
Vehicles Approaching from the Right on a Two -Lane Highway or Street
Only
Design Speed
(Vmajor)
(mph)
Intersection Sight Distance (Feet)
Passenger
Car
Single Unit
Truck Tractor/Semitrailers
15 170 210 255
20 225 280 340
25 280 350 425
30 335 420 510
35 390 490 595
40 445 560 680
45 500 630 765
50 555 700 850
55 610 770 930
60 665 840 1015
Note: These ISD values assume a minor road approach grade less
than or equal to 3 percent. For grades greater than 3 percent,
increase the ISD value by 10 percent.
b. The design speed for sight distance requirements at entrance intersections shall be the existing posted
speed limit.
c. Distances shall be measured from a point on the centerline of the entering road or driveway 15 feet
back from the edge of the nearest trafficway in the abutting street, and extending in both directions along the
abutting street.
1. Minimum sight distances are to be measured from the driver’s eyes, which are assumed to be
three and a half (3.5) feet in height above the pavement surface, to an object two (2) feet above the
pavement in the center of every on- coming travel lane.
2. The sight distance shall be clear along its entire minimum length and un - impaired by intervening
changes in street grade, horizontal alignment or obstructions. Examples of obstructions are
vegetation, ground cover, signs, existing topography, etc .
Formatted: Centered
Formatted: Font: 16 pt
Formatted: Right
Formatted: Centered
Page 25 of 113
Roadway Design Standards and Policies
Pickens County
Figure 10.5 Sight Distance
(8) Dead-end streets.
a. Dead-end street length.
1. A dead-end street shall be no more than twenty-five hundred (2500) feet long unless necessitated
by topographic or other conditions and approved by the County Engineer.
2. Where a dead-end street exceeds twenty-five hundred (2500) feet in length, the County Engineer
shall require one or multiple interim turn around(s) to be provided.
Page 26 of 113
Roadway Design Standards and Policies
Pickens County
3. A dead-end street shall have a length of no less than one hundred twenty -five (125)
feet.
4. The length of a dead-end street shall be the distance along the centerline of the dead-end street
measured from the centerline of the intersecting street to the center point of the turnaround radius .
5. Other cul-de-sac designs may be considered by the County Engineer on a case by case basis.
b. Turnaround dimensions.
1. Dead-end streets in residential subdivisions shall terminate in a circular turnaround having a
minimum right-of-way of at least fifty (50) feet in radius, and a paved turnaround with a minimum
outside radius of forty (40) feet.
Page 27 of 113
Roadway Design Standards and Policies
Pickens County
2. Cul-de-sacs in commercial and industrial subdivisions shall terminate in a circular turnaround
having a minimum right-of-way of at least one hundred (100) feet in radius, and a paved
turnaround with a minimum radius of eighty (80) feet.
c. A dead-end street other than a cul-de-sac shall not be allowed except as a temporary stage of construction of a street
that will be extended in a later stage of construction. A temporary dead-end street shall be provided with a
temporary turn-around having a roadway radius of forty (40) feet if:
1. one or more lots front exclusively on the street; and,
2. extension of the street is not under construction when the Final Plat is submitted for recording.
3. Temporary turnarounds shall consist of three (3) inches of graded aggregate base course.
(9) Alleys and service drives.
a. Alleys may be required at the rear of all lots used for multi -family, commercial or industrial developments.
b. Alleys in residential subdivisions shall not be permitted, unless the alleys are intended to provide rear -access to
garages on each lot.
c. When allowed, dead-end alleys shall be provided with a turn-around having a radius of at least forty (40) feet, a “T -
head” turn-around, or other solution acceptable to the County Engineer.
Page 28 of 113
Roadway Design Standards and Policies
Pickens County
(10) Half streets prohibited.
Half streets are prohibited. Whenever a street is planned adjacent to the proposed subdivision tract boundary, the entire str eet
right-of-way shall be platted within the proposed subdivision.
(11) Split Level Streets and One-way Streets.
Streets which are constructed so as to have two trafficways, each at a different level within the same right -of-way, shall provide a
paved traffic surface of at least sixteen (16) feet on each level and a slope between the two trafficways of not steeper than four to
one. One-way streets and split streets will be allowed when:
a. Topographic conditions are such that alternatives to the typical street construction would be more desirable.
b. The shape and size of the parcel could be more efficiently developed. In either case, approval must be obtained from
the Engineering Department for the specific design.
(12) Intersection islands.
Islands at intersections and the placement of signs within the right -of-way shall be subject to individual approval by the County
Engineer. The following criteria shall be met in the construction plans of such intersections:
a. Additional right-of-way must be provided to accommodate the divided intersection of island so as to meet all other
requirements of this ordinance.
b. No type of sign or other construction will be located within ten (10) feet horizontally from the road right -of-way of the
connecting road. In the event the connecting road has no right -of-way, an assumed right-of-way of twenty-five (25)
feet from the centerline shall be applied.
c. A concrete curb shall be constructed around the inside perimeter of the island. This curb shall be located four (4) feet
horizontally from any sign or structure on all sides.
d. The paved roadway on each side of the island shall have a usable paved width of not less than sixteen (16) feet.
e. The centerline of intersecting streets shall be a minimum of one hundred fifty (150) feet beyond the end of the entrance
island. No taper shall be allowed across the width of intersecting roadways.
f. No driveway curb cuts shall be allowed within five (5) feet of the end (rear) of the entrance island.
g. There shall be one hundred (100) feet of tangent roadway separating the entrance from a curve in the roadway.
h. The front of the island shall not encroach upon the intersecting right -of-way and shall not be more than ten (10) feet
from the same right-of-way.
i. Islands shall be properly underdrained.
j. Islands shall be maintained by the Commercial/Industrial subdivision owner or the subdivision’s Home Owners
Association.
k. Vegetation planted within islands shall not obscure motorists ’ view between the heights of 2’ – 7’ above the pavement.
Plantings shall be approved by the County.
l. If the responsible parties for the maintenance of the islands are unresponsive to requests to remove dangerous trees
and limbs from islands, the County reserves the right to remove these trees or portion of trees at the owner’s expense
if necessary.
Page 29 of 113
Roadway Design Standards and Policies
Pickens County
Page 30 of 113
Roadway Design Standards and Policies
Pickens County
(13) Intersections and Driveway Grades
All streets and driveways shall provide a maximum grade of five (5) percent for a distance of twenty (20) feet from the edge of
pavement at any intersection (see figure 10.11)
Page 31 of 113
Roadway Design Standards and Policies
Pickens County
(Section Amended 4/1/2024)
10 (f) Street Improvements
Roadways shall be constructed and paved with asphalt/stone courses meeting the following standards:
(1) Minimum width of pavement.
a. The minimum pavement width, measured from edge of pavement to edge of pavement, shall be as required for the
street type as shown in Table 10.6 as well as in the design details.
(2) Street base.
a. Proof rolling will be witnessed by County inspector or certified by design engineer. Correct areas shown by the proof
rolling operation to be unstable or non-uniform. After correction of these deficient areas, repeat the proof rolling
operation.
b. Wherever unsuitable material is found in the subgrade, the unsuitable material shall be replaced with graded aggregate
stone.
c. Graded aggregate base course. The base course shall consist of mineral aggregate and may be a combination of
natural deposit or a blend of the materials specified. All materials are subject to approval by the County Engineer.
d. Street base material shall conform to the thickness as required for the street type in the Table 10.6 as well as in the
design details.
e. For streets without curbs, the base shall extend at least one half (0.5) foot beyond the edge of payment.
(3) Pavement surface course.
a. Prime. After the base has been placed, mixed, compacted, shaped, inspected and accepted, it shall be primed with
suitable asphaltic materials as specified by the County Engineer.
b. Roadway Intermediate Course. After the prime has been inspected and accepted, the roadway or street shall be
surfaced with Type B Intermediate Course as required for the street type on Table 10.6.
c. Tack coat shall be applied on a prepared road surface according to the requirements of the County Engineer and the
current standards of SCDOT.
Page 32 of 113
Roadway Design Standards and Policies
Pickens County
Table 10.6 Street Pavement Composition
Street Classification
Width of
Pavement Base Course
Intermediate
Course Surface Course
Residential Collector 24 ft. 6" GABC B 330 LBS/SY C 220 LBS/SY
Local Commercial or Industrial
Street 24 ft. 10" GABC B 440 LBS/SY C 220 LBS/SY
Local Residential Street 24 ft. 6" GABC B 220 LBS/SY C 220 LBS/SY
Alley 16 ft. 6" GABC B 220 LBS/SY C 155 LBS/SY
Roadway composition may be substituted by approved equivalent asphalt design structural number.
d. Final Surface Course shall consist of Type C asphalt pavement as required for the street type on Table 10.6.
e. If two-stage paving for residential streets is approved by the County Engineer, the developer shall place the binder
course on the street but may delay final paving. Prior to the expiration of the performance period, the binder surface
will be primed with suitable asphaltic materials [0.25 gallon of R.C. 70 per square yard] the same day it is compacted,
and cured for 7 days prior to paving. After the prime has been inspected and accepted, the roadway or street shall be
surfaced with a minimum 2 inches of Type C asphalt pavement wearing surface. No surface treatment pavement
as a finished wear surface will be accepted. All asphalt pavements will be mixed in an asphalt plant meeting the latest
requirements of the SCDOT.
f. Rolling and finishing
1. Rolling shall start at the edge and proceed toward the center, except on superelevated curves where rolling
shall proceed from the lower to the upper side and shall continue until the aggregates are firmly keyed or set.
On depressed widened areas not accessible for the operation of standard rollers, compaction shall be
performed by other approved rollers or methods.
2. If initial compaction has been performed and the voids have not been filled, fine aggregate shall be placed
upon the base in amount only sufficient to fill the voids. The base course shall be broomed, wetted and
rolled until the coarse aggregate is firmly set, bonded, and the base thoroughly compacted for the full width
and depth. During all phases of the work extreme care shall be taken to protect structures.
3. Finished roadbeds shall be crowned or elevated from the shoulder to centerline at a rate of 50:1 or 2% cross
slope. Superelevated curves or tying to intersections may require steeper cross slopes. Compaction shall
be to the satisfaction of the County Engineer.
Page 33 of 113
Roadway Design Standards and Policies
Pickens County
Figure 10.11A Roadway Typical Sections
(4) Curb and gutter.
a. Curb and gutter are required along:
1. All new commercial and industrial streets.
2. All new residential subdivision streets except for those subdivisions meeting the following
criteria:
a) Fewer than twenty-four (24) lots will be located in the subdivision on the new streets; or
b) The average size of all lots in the subdivision is greater than one (1) acre and the average lot width
is greater than one hundred fifty (150) feet.
3. Existing County streets and roads that abut a subdivision where curb and gutter are required, or abut a multi -
family or nonresidential development.
4. New construction on existing County streets and roads, including deceleration lanes and travel lane
widenings.
b. Local residential street curbs shall be, at a minimum, Portland cement concrete, 6 -inch x 18-inch x 10-inch vertical or
roll back type, with a minimum strength of 3,000 psi at twenty -eight (28) days
Page 34 of 113
Roadway Design Standards and Policies
Pickens County
Figure 10.11B Curb & Gutter Typical Sections
c. Curbs along collectors and local commercial or industrial street curbs shall be Portland cement concrete, 6 -inch x 24-
inch x 12-inch vertical type only, with a minimum strength of 3,000 psi at twenty -eight (28) days.
d. Curbing along streets shall meet the following standards:
1. Developer’s engineer or surveyor shall set line and grade.
2. One-half inch expansion joints of pre-molded bitumastic expansion joint material shall be provided at all
radius points and at intervals not to exceed 50 feet in the remainder of the curb and gutter.
3. The County Engineer shall individually approve special curbing design (center islands, etc.).
Page 35 of 113
Roadway Design Standards and Policies
Pickens County
4. Curb and gutter shall be set true to line and grade and finished by skilled workers to the section shown on
the plans.
5. Inferior workmanship or construction methods resulting in unsightly curb and gutter will be cause for rejection
of the finished work.
6. All curbing shall be backfilled and grassed.
7. Adequate storm drainage structures shall be provided. The curb and gutter shall be constructed so as to
present a smooth, even line both horizontally and vertically. There shall be no areas of ponding.
8. After installation, drainage under the curb to side slopes is required, using minimum 4 -inch diameter pipe
sections.
e. A valley gutter may be used across a driveway at its intersection with a street. However, valley gutters shall
not be allowed across streets at street intersections unless specifically approved by the County Engineer.
(5) Slopes and Shoulder Improvements.
a. On streets with curb and gutter, the shoulders shall slope 30:1 or 3.33% toward the roadway for at least eight (8)
feet from back of curb, and no steeper than 4:1 for the remainder of the right-of-way width.
b. On streets with swale ditch drainage, the shoulders shall slope 12.5:1 or 8% away from the roadway for at least
four (4) feet to the drainage channel. The maximum slope for the drainage channel shall be 4:1.
(6) Guardrails
Guardrails shall be installed as per SCDOT specifications. Any slope steeper than 4:1 with an embankment greater than six (6)
feet in height shall require a guardrail. Guardrail where necessary near intersections and driveways shall have adequate sight
distance for motorists looking over the guardrail. Guardrail may be necessary to protect existing structures, designe r should
refer to AASHTO clear zones for guidance.
10 (g) Substandard streets.
In the event that a proposed commercial development or residential development of five (5) homes or more has access to a
substandard road (i.e., a dirt or gravel road), the following project access improvements shall be required if deemed necessary
by the County Engineer:
(1) The substandard street shall be upgraded by the developer to a standard County road from the project entrance to
the nearest standard paved road along the route of access.
(2) The roadway section shall meet the requirements of a residential collector street. (3) The developer shall design the r oad
and provide the labor, equipment and materials required for roadway improvements and necessary drainage improvements.
(4) The right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the County. If
the developer cannot acquire adequate right-of-way, the County Attorney shall initiate acquisition proceedings at the expense of
the developer after authorization by the County Council.
(5) If Pickens County desires the roadway to be improved to a standard greater than that for a residential collector street, the
County shall provide or pay the cost of the additional right -of-way, materials and labor.
10 (h) Street Abandonment.
Place Holder for Street Abandonment Procedures
Page 36 of 113
Roadway Design Standards and Policies
Pickens County
Page 37 of 113
Roadway Design Standards and Policies
Pickens County
Sec. XI Private residential access.
Private residential access, if approved by the County, shall meet the following requirements and standards that apply to each ,
respective private access classification.
11 (a) Shared driveways.
(1) No more than three (3) lots may be served by a shared driveway.
(2) When three (3) lots are served by a shared driveway, the shared driveway must be named; said name shall be approved by
Pickens County E-911 staff.
(3) The shared driveway shall be located within an easement of at least twenty (20) feet in width.
(4) The maintenance of the shared driveway must be mutually agreed upon by the respective property owners and this
maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually
noted within the respective deeds.
(5) The following plat certification shall be placed upon every plat for every lot utilizing a shared driveway:
“The shared driveway and associated easement shown on this plat shall be a private access not owned, maintained, or
supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All
easements shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless
constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended.”
(6) There are no minimum construction standards for the shared driveway, with the exception of the driveway that encroaches
onto the County or State right-of-way for access to the public street.
11 (b) Common drive.
(1) No more than ten (10) lots may have access to a common drive.
(2) All lots which gain access from a common drive shall be at least one (1) acre in size, exclusive of that portion of the lot which
is traversed by the required easement.
(3) The common drive shall be located within an easement of at least fifty (50) feet in width or within a designated right -of-way of
at least fifty (50) in width. If the common drive is located within a designated right -of-way, then that right-of-way shall be owned
and controlled by a homeowner’s association or other entity responsible of the drive’s maintenance.
(4) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the common drive.
(5) The common drive cannot originate from a shared driveway, another common drive or from a private road or be connected at
both ends to a public road.
(6) The maintenance of the common drive must be mutually agreed upon by the respective property owners and this
maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually
noted within the respective deeds.
(7) The following plat certification shall be placed upon every plat for every lot utilizing a common drive:
“The common drive and associated easement or right -of-way shown on this plat shall be a private access not owned,
maintained, or supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County.
All easements and rights-of-way shown upon the plat shall not be accepted for maintenance by Pickens County at any time in
the future unless constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as
amended.”
(8) Only those lots approved by the Planning Commission or by Planning Staff and platted with the common drive may utilize
said drive.
(9) The common drive must be named; said name shall be approved by Pickens County E -911 staff (when three (3) or more lots
are utilizing the common drive).
Page 38 of 113
Roadway Design Standards and Policies
Pickens County
(10) The following, minimum construction standards shall apply. The standards must be certified as being met by a surveyor o r
engineer licensed in the State of South Carolina prior to plat approval.
a. Have a fourteen (14) foot driving surface with four (4) inch thick compacted stone base and height clearance
of thirteen and one-half (13.5) feet, and if a bridge is constructed as part of the private drive, a professional
engineer shall certify the weight which the bridge will support and a sign shall be conspicuously displayed on
each end of the bridge displaying the weight limits.
b. Be provided with an unpaved cul-de-sac having a radius of thirty (30) feet or ending in a (t) with two twenty -
five (25) foot extensions for vehicular turning movements.
c. Observe minimum road offsets for public roads. When an offset in alignment of a road occurs and where the
topography is suitable, a minimum distance between eighty (80) feet and one hundred and twenty -five (125)
feet shall separate opposing roads from centerline to centerline.
d. Observe the sight distance standards where the private drive intersects a public road to meet the
requirements of Table 10.5 Minimum Sight Distance. The sight distance shall be measured from a seeing
height of three and one-half feet to an object two feet in height above the grade of the public road. If the
proposed drive does not meet the sight distance requirement, a waiver must be signed by the individual(s)
constructing the private drive stating that the owner(s) is liable and responsible for any accidents, injuries,
problems, and property damage resulting from improper sight distance.
e. Meet the County’s and SCDES Storm Water Management and Erosion and Sediment Control Regulations.
11 (c) Shared Drive / Common Drive Hybrid.
(1) No more than five (5) lots or dwellings may be served by a shared driveway.
(2) When three (3) lots are served by a shared driveway, the shared driveway must be named; said name shall be approved by
Pickens County E-911 staff.
(3) The shared driveway shall be located within an easement of at least thirty (30) feet in width. (Shared driveway easements
shall not be considered a part of a lot for the purpose of meeting the minimum requirements of this Development Standards
Ordinance.)
(4) The maintenance of the shared driveway must be mutually agreed upon by the respective property owners and this
maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually
noted within the respective deeds.
(5) The following plat certification shall be placed upon every plat for every lot utilizing a shared driveway:
“The shared driveway and associated easement shown on this plat shall be a private access not owned, maintained, or
supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements
shown upon the plat shall not be considered for acceptance for maintenance by Pickens County.
(6) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the shared driveway.
(7) The shared driveway cannot originate from another shared driveway or be connected at both ends to a public road.
(8) The following minimum construction standards shall apply when a shared driveway serves more than 3 lots or dwellings. The
standards must be certified as being met by a surveyor or engineer licensed in the State of South Carolina prior to plat appr oval.
a. Have a fourteen (14) foot driving surface with four (4) inch thick compacted stone base and height clearance
of thirteen and one-half (13.5) feet, and if a bridge is constructed as part of the private drive, a professional
engineer shall certify the weight which the bridge will support and a sign shall be conspicuously displayed on
each end of the bridge displaying the weight limits.
b. Be provided with an unpaved cul-de-sac having a radius of thirty (30) feet or ending in a (t) with two twenty -
five (25) foot extensions for vehicular turning movements.
c. Meet the County’s and DES Storm Water Management and Erosion and Sediment Control Regulations.
Page 39 of 113
Roadway Design Standards and Policies
Pickens County
d. Access onto a State road shall meet existing SC Department of Transportation requirements. Access onto a
County road must be approved by the Pickens County Roads and Bridges Department through an
encroachment permit.
e. Construction and design exceptions may be granted upon the joint approval of the County Engineer, the
Director of Emergency Services, and the Planning Department.
11 (d) Private Roads.
(1) The maximum number of lots which may be served by a private road shall be governed by Article 4 of this ordinance.
(2) The private road shall be located within a designated right -of-way of at least fifty (50) feet in width and that right -of-way shall
be owned and controlled by a homeowner’s association or other entity responsible for the road’s maintenance.
(3) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the private road.
(4) Minimum lot size shall be governed by Article 4.
(5) The private road cannot originate from a shared driveway or from a common drive. The private road may originate and
connect to another private road provided that road meets the minimum requirements listed in this section.
(6) The maintenance of the private road must be mutually agreed upon by the respective property owners and this maintenance
agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually noted within th e
respective deeds.
(7) The following plat certification shall be placed upon every plat for every lot utilizing a private road:
“The private road and associated right-of-way shown on this plat shall be a private access not owned, maintained, or supervised
by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements and rights -
of-way shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless
constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended.”
(8) All subdivisions utilizing private roads for access must be approved by the Planning Commission in accordance with the
procedures listed in Article 12.
(9) Only those lots approved by the Planning Commission and platted with the private road may utilize said road.
(10) The private road must be named; said name shall be approved by Pickens County E-911 staff.
(11) Construction standards.
The private road shall be constructed in accordance with the respective requirements for a public, local residential street.
Sec. XII Street signs, traffic signs and striping.
12 (a) Street name signs.
(1) Street name signs of a type approved by the County are to be placed at all intersections.
(2) Street markers shall be installed by the Developer at the Developer’s expense (or a homeowners association in the event an
alternate signpost is chosen at a later date).
(3) If nonstandard street signs are installed by the Developer/HOA, the Developer/HOA shall maintain the street signs.
12 (b) Traffic Signs.
(1) Traffic control signs shall conform to the U.S. Manual on Uniform Traffic Control Devices, latest edition.
(2) The Developer shall install these traffic control signs.
Page 40 of 113
Roadway Design Standards and Policies
Pickens County
(3) Stop signs shall be located from the sign’s edge 6 feet off the back of curb or edge of pavement at the beginning of the
intersection radius. The sign shall be located on the right side of the intersection. The bottom of the sign shall be at leas t 7 feet
above the edge of pavement or back-of-curb. This standard applies to typical residential interior street intersections.
(4) All other intersections shall have stop signs located according to the Manual on Uniform Traffic Control Devices. The
Developer shall install these signs.
(5) Stop signs shall be sized so that their overall dimensions are 30 inches by 30 inches.
(6) All other signs shall be sized according to the Manual on Uniform Traffic Control Devices.
12 (c) Striping Requirements
(1) All newly constructed streets having four (4) or more lanes (including auxiliary lanes) and existing streets being widen ed with
one or more additional lanes shall be striped by the developer prior to approval and acceptance of the development by Pickens
County.
(2) Striping shall be accomplished with paint meeting SCDOT standards conforming to the Manual on Uniform Traffic Control
Devices.
(3) Final striping shall be thermoplastic.
(4) Yellow double center line markings should be placed on collector streets that have a traveled way of 18 feet or more in width
and an ADT of 3,000 vehicles per day or greater. White edge line markings should be placed on collector streets with a trave led
way of 20 feet or more in width and an ADT of 3,000 vehicles per day or greater. Yellow center line and white edge markings in
residential subdivisions are not necessary. Engineering judgement should be used if ADTs are not available.
Sec. XIII Street Lights
The installation of all street lighting fixtures within County right -of-way must be approved by the County Engineer prior to such
installation. All street lighting fixtures, including those within County right -of-way shall be maintained by the HOA.
Sec. XIV Driveway and Development entrances.
All proposed subdivisions, subdivision lots and other land developments shall be provided with driveways or development
entrances meeting the following requirements:
14 (a) Encroachment Permit
An encroachment permit will be necessary for any new roadway, driveway, or drainage structure installed within the County rig ht
of way.
(1) Link to Encroachment Permit -
https://cms5.revize.com/revize/pickenscountysc/document_center/I%20WAnt%20To/Document%20&%20Forms/Roads%20
and%20Bridges/Encroachment%20Application%20Revised%201_25.pdf
(2) See Table 10.5 for sight distance requirements.
(3) The centerline of the proposed driveway or roadway must be staked and verified for adequate sight distance by County
representative. Final clearing of vegetation and trees will be necessary prior to field verification.
14 (b) Driveway access to a State road.
Access onto a State road shall meet existing SC Department of Transportation requirements. A copy of the SC Department of
Transportation permit shall be submitted to the County Engineer before the plans can be approved.
14 (c) Driveway access to major County roads.
Page 41 of 113
Roadway Design Standards and Policies
Pickens County
(1) Residential lots in any major subdivision shall have no direct driveway access to a County major collector or arterial r oad
unless approved by the County Engineer, or to a State or U.S. numbered highway unless approved by the SCDOT, and
incorporated into the construction drawings for the project prior to issuance of a development permit by Pickens County.
(2) Reverse frontage lots may be utilized but are not required in major residential subdivisions where direct access to a Co unty
road, or to a State or U.S. numbered highway, is not allowed.
14 (d) Driveway standards; in general.
Each driveway shall be constructed in a manner that will not damage the adjacent roadway or hinder use of the adjacent
roadway.
(1) Driveways shall not intersect adjacent roads at an interior angle less than 60 degrees;
(2) All waters from driveways must enter onto the shoulders of adjacent roads and into the ditch or gutter. No water shall e nter
onto the adjacent road surface or pavement;
(3) Any driveway entering on a roadway or street shall provide a maximum grade of five (5) percent for a distance of twenty (20)
feet from the edge of pavement at any intersection.
(4) At the ditchline, the driveway must be lower in elevation than the adjacent roadbed;
(5) As far as practical, all driveways must be located and constructed so as to maximize sight distance by those traversing the
driveway or the adjacent road;
(6) In and around the first fifty (50) feet of all driveway culverts, the slope of the land shall be at a grade of no more t han 3:1 so
as to enable to County to better maintain the culvert area; and
(7) All driveway culvert pipes shall comply with the materials and installation requirements of this Article.
(8) On subdivided lots which access an existing County road, the driveway shall be placed as far as possible from existing r oad
intersections to maximize sight distance.
(9) Driveway spacing from adjacent driveways or intersections sh all meet the minimum distances shown below.
14 (e) Residential subdivision entrances.
(1) Access improvements such as deceleration lanes, dedicated left -turning lanes, center turn lanes, merge lanes, signalization,
etc., required as deemed necessary for safe traffic operations by the County Engineer shall be installed at all entrance road s into
a residential major subdivision. See Sec. 1016, below.
(2) A single entrance road to a subdivision shall serve no more than ninety -nine (99) lots. Where the property configuration
prohibits or makes impractical the installation of more than one entrance, the County Engineer may waive this requirement
following sound engineering practice. When more than one entrance is required, the first additional entrance shall be provide d to
serve up to an additional one hundred fifty (150) lots, and each additional entrance thereafter shall be provided for each
additional two-hundred fifty (250) lots.
(3) Residential major subdivisions with fewer than twenty -four (24) lots whose entrance is on an existing collector or arterial
road, and any major residential subdivision whose entrance is on an existing minor collector road, shall install offset radii and fifty
(50) foot tapers.
Page 42 of 113
Roadway Design Standards and Policies
Pickens County
14 (f) Commercial/Industrial subdivision entrances.
Access improvements such as deceleration lanes, dedicated left -turning lanes, center turn lanes, merge lanes, signalization, etc.,
required as deemed necessary for safe traffic operations by the County Engineer shall be installed at all entrance roads into a
commercial/Industrial subdivision. See Sec. 1016, below.
14 (g) Driveways for multi-family and non-residential developments.
(1) Access improvements such as deceleration lanes, dedicated left -turning lanes, center turn lanes, merge lanes, signalization,
etc., required as deemed necessary for safe traffic operations by the County Engineer shall be installed at all entrance road s into
a multi-family or non-residential development.
(2) If a driveway entrance on a major collector or arterial street is less than two hundred (200) feet from an intersection, a
continuous travel lane shall be constructed from the intersecting street to the driveway, and an acceleration lane shall be
constructed beyond the driveway. Acceleration lanes shall extend for one hundred fifty (150) feet, with an additional fifty
(50) foot taper length, and have a pavement width of twelve (12) feet (exclusive of curb and gutter). Additional right -of-way
to accommodate the acceleration lane and a ten (10) foot shoulder shall be dedicated by the developer to Pickens County
(3) Commercial businesses on corner lots that have frontage on a local or minor collector side street shall install an addit ional
lane out to the intersection if driveway access from said side street is provided.
14 (h) Maintenance of sight distances.
The developer shall be required to upgrade the existing County road to meet the sight distance requirements of this Article. In
cases involving rock cuts, deep fills or cuts, proximity to floodplain, etc., the requirements of pavement widening for full
deceleration lanes may be modified or waived by the County Engineer following accepted engineering practice.
Sec. XV Deceleration lanes and turn lanes.
15 (a) Deceleration lanes; where required.
A deceleration lane shall be required at each entrance to a residential subdivision of 24 lots or more, commercial or industrial
subdivision, multifamily development or nonresidential development at its point of access with a collector or arterial street .
15 (b) Median breaks.
If the street has an existing or proposed median, and the developer desires to construct a median break to serve the
development, a left turn lane leading to the median break shall be provided by the developer meeting the design standards of
Pickens County.
15 (c) Deceleration and turn lane constructions standards.
(1) Generally, deceleration lanes and turn lanes shall be a minimum length of one hundred fifty (150) feet, with an addition al fifty
(50) foot taper length, and a pavement width of twelve (12) feet (exclusive of curb and gutter). Additional right -of-way to
accommodate the deceleration lane or turn lane and a ten (10) foot shoulder shall be dedicated by the developer to Pickens
County. Deceleration lanes and tapers may be required to be of greater length, based on the design speed of the road.
(2) Curb and gutter along all deceleration lanes and tapers are required, and shall be constructed in accordance with 1010
(e)(3)f.
(3) Associated drainage improvements as deemed necessary by the construction of the deceleration or turn lane shall also be
required.
(4) Other project access improvements may be required by the County Engineer in addition to or in lieu of a required
deceleration lane in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public,
based on a traffic study prepared by a professional engineer.
Page 43 of 113
Roadway Design Standards and Policies
Pickens County
(5) The developer will pay the cost of any catch basins that must be constructed along an existing County road as a result o f the
deceleration lane.
(6) Utilities and drain pipes shall be relocated at the developer’s expense outside of the deceleration lane. Waterlines can
remain beneath the additional lanes.
Sec. XVI Sidewalks.
16 (a) Sidewalks; where required.
(1) The Planning Commission, in consultation with the School District of Pickens County, shall determine the need for
sidewalks within subdivisions within one (1) mile of a school or for any subdivision with 10 or more homes on lots one (1) ac re or
less. If the determination is that a sidewalk is necessary, the subdivision developer shall be required to construct a concrete
sidewalk on both sides of all residential collector and residential local streets within the proposed development.
(2) The Planning Commission, in consultation with any adjacent municipality when a proposed development is located adjacent
to that municipality’s sidewalk network, shall determine the need for sidewalks within that development. If the determination is
that a sidewalk is necessary for circulation and access to public facilities or shopping opportunities, the subdivision devel oper
shall be required to construct a concrete sidewalk on both sides of all residential collector and residential local s treets within the
proposed development.
(3) Sidewalks are not required along any street that does not have curb and gutter.
(4) Sidewalks shall be maintained by the Developer/HOA.
16 (b) Sidewalks; where located.
(1) Sidewalks shall be located a minimum of two (2) feet from the back of curb, and a minimum of one (1) foot from the property
line to prevent interference of encroachment by fencing, walls, hedges or other planting or structures placed on the property line
at a later date.
(2) Sidewalks, when required, shall be located on one side of all residential collector and residential local streets within the
proposed development.
16 (c) Sidewalks; construction.
(1) Sidewalks must comply with all requirements of the federal Americans with Disabilities Act.
(2) Concrete sidewalks shall be a minimum of five (5) feet wide and four (4) inches thick.
(3) Concrete shall be 3,000 psi at twenty-eight (28) days’ strength.
(4) Sidewalks shall be backfilled and landscaped.
16 (d) Crosswalks.
Crosswalks shall be installed at stop-controlled intersections having sidewalks. Thermoplastic striping eight inches wide shall
designate the six feet wide crosswalk. The stop bar shall be placed a minimum of 4’ from the crosswalk.
Page 44 of 113
Roadway Design Standards and Policies
Pickens County
Sec. XVII Location of utilities and curb cuts.
All utility work, encroachments, pavement cuts and associated road or lane closures must be reviewed, approved and permitted
by the County Engineer.
17 (a) Location of utilities in streets.
(1) Above-ground utilities.
Street light poles, junction boxes, transformers and other public or private utility structures placed above ground within a street
right-of-way must be at least eight (8) feet back from the back of the street curb (or edge of pavement) and one (1) foot back
from the edge of any sidewalk, whichever is farthermost from the roadway.
(2) Underground Utilities.
a. Utilities placed underground shall be placed within the right -of-way as shown on the Standard Details.
b. The right-of-way is to be cleared and rough graded the full width prior to any utility installation.
c. Cable and pipe shall be three (3) foot below finished grade minimum.
Page 45 of 113
Roadway Design Standards and Policies
Pickens County
d. Any disturbance or construction in the completed (seeded and/or sodded) right -of-way by a public utility such
as power, water, sewer, gas, phone and cable must be repaired and/or replaced with the specified materials
as called for in the initial improvements.
e. All utilities beneath pavement shall be installed and the ditch backfilled and thoroughly compacted before any
pavement or base is installed, or the pipes shall be bored if installed after street construction. If pavement
cuts are necessary to repair utilities, asphalt repairs shall match the existing roadway pavement section.
f. All utility manholes and valve boxes shall be brought to the finished grade within the roadway section.
g. All private utilities that will cross under pavement shall be installed completely throughout the subdivision
prior to any roadway base being applied. Approved utility sleeves shall be installed if utility installations are
not completed prior to roadway base construction.
h. All utilities shall parallel the roadway and be placed in the shoulders excluding where crossings are
necessary. Utilities crossing under the roadway, excluding lateral, shall be perpendicular to the roadway and
sleeved.
i. Utility plans shall be approved by the County Engineer.
(3) Underground utility location with open ditch.
a. Maximum drainage swale slopes (front and back) are 5:1 and a minimum of 4:1 with the invert of the swale
no less than twenty-four (24) inches from the finished elevation of the street.
b. Utilities shall have a minimum 24”cover from the invert of the ditch and the bottom of culverts.
(4) Underground utility location with curb and gutter. Cross drains are to be carried to the toe of construction slope.
Sec. XVIII Storm drainage.
Stormwater facilities shall be governed by the Pickens County Stormwater Ordinance and accompanying Stormwater Design
Manual. Where discrepancies exist between this development ordinance and the adopted Pickens County Stormwater
Ordinance and accompanying Stormwater Design Manual, the Stormwater Ordinance shall control.
18 (a) Applicability and exemptions.
(1) An adequate drainage system, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provi ded for
the proper drainage of all surface water.
(2) All persons proposing development or construction in the County shall prepare a stormwater management plan. No final
subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater
management plan has been reviewed and approved by the County Stormwater Manager and the County Engineer as guided by
the Pickens County Storm Water Ordinance and accompanying Storm Water Manual.
(3) Exemptions from Storm Drainage Requirements.
Consultation should be made with the Pickens County Stormwater Manager to determine any applicable exemptions from these
requirements.
(4) Any revisions to the stormwater management plan shall be submitted to the County Engineer for review and approval.
18 (b) Standards to be used in designing system:
(1) Storm detention facilities:
All stormwater detention facilities shall be provided for and designed according to the adopted Stormwater Ordinance and
accompanying Stormwater Design Manual.
(2) Location of stormwater detention facilities.
Page 46 of 113
Roadway Design Standards and Policies
Pickens County
a. In residential subdivisions, the detention facility must be located on a separate lot and owned by a
homeowners’ association, which shall be responsible for its maintenance and continuing operation. The lot
need not meet minimum lot size requirements for the subdivision.
b. In nonresidential subdivisions, the detention facility may be located on a separate lot and owned by a
property owners’ association, which shall be responsible for its maintenance and continuing operation; or
located on each lot within the subdivision and constructed when the lot is developed.
c. In multi-family and nonresidential development projects, separate detention facilities shall be provided for
each development. The owner of the property shall be responsible for maintenance and continuing operation
of the facility.
d. Stormwater detention facilities serving two or more developments may be approved by the County,
provided that private ownership of the facilities and provisions for their perpetual maintenance and continuing
operation are clearly established in a manner acceptable to the County Attorney.
e. Where fences are required to be provided by the County Engineer, they shall be constructed between 3.5
and 6 feet high.
1. Commercial gauge chain link fence shall be screened with acceptable hedge material or a
climbing vine.
2. If a wood fence is desired it shall be placed on the lots of the individual property owners and be
noted as their maintenance responsibility (i.e., shown on the plats and deeds at dedication).
(3) Storm Drains.
a. Crossline pipes shall be designed to carry a 25 year – 24-hour storm and shall be RCP Class III concrete.
The design shall be determined using runoff data sources and standard methods approved by the County
Engineer. However, no culvert less than eighteen (18) inches in diameter will be acceptable.
b. Concrete culverts must conform to South Carolina Highway Department requirements. Hancor double wall
plastic pipe or an approved equivalent shall be accepted where sufficient fill over the pipe is provided. No
metal pipes shall be accepted.
c. All parallel culverts and driveway culverts shall be designed to carry a 10 year – 24 hour storm event.
Driveway culverts shall be a minimum of fifteen (15) inches in diameter.
d. Where possible, all pipe shall be laid in a trench. Trenches shall be excavated to the required grade and to a
width sufficient to allow for proper installation and back fill around the pipe. The backfill method used shall
be different for rigid (concrete) and for flexible (corrugated) pipe and shall be as specified by the
manufacturer. All culverts shall have a minimum of ten (10) inches fill above the top of the culvert, excluding
pavement and/or base of pavement. Flexible pipe shall have a minimum of two feet of fill over the pipe. All
fill shall be compacted to 98% of standard proctor test in the top foot of fill.
e. The jointing of sections of culvert shall be done in a workmanlike manner in accordance with the standard
practice recommended by the manufacturer of the culvert being used.
f. The ends of all pipe culverts shall be properly protected to prevent piping, erosion and scour. Placement of
filter fabric and rip-rap shall be considered minimum treatment. End treatments shall be approved by the
County Engineer and shown on the plans.
g. All crossline drainage culverts shall be located in natural drainage areas or depressions. All crossline
culverts will terminate at a dedicated drainage easement. Drainage easements shall be a minimum of twenty
(20) feet wide.
h. All existing culverts within the County right-of-way impacted by proposed developments shall be upgraded as
necessary to accommodate proposed flows.
i. Junction boxes of an approved type will be constructed at all points where the line of pipe changes course or
direction ten (10) degrees or more and at proper intervals along the line of pipe.
Page 47 of 113
Roadway Design Standards and Policies
Pickens County
j. A means of access to inlet and outlet points of drainage structures and appurtenances must be provided and
shown on the plans. Pickens County will not be responsible for damage to property outside of drainage
easements caused by floods.
k. Exits for surface water in sideline ditches or curbs shall be provided in accordance with the following
schedule:
l. All storm water drainage features such as swales, ditches and pipes shall be constructed to an approved
discharge point or to the property line of the development. All storm water features shall be in place and
properly stabilized to prevent erosion of the constructed swale or ditch. Velocities within grass stabilized
ditches or swales shall be held to non-erosive flow rates. Storm water flow rate calculations shall be based
upon proposed ground cover conditions and the Manning Equation and submitted to the County Engineer
before approval of the construction plans is given.
(4) Bridges
In the event that it becomes necessary to install a bridge rather than a pipe culvert, then such bridge and installation shal l
conform to current South Carolina Department of Transportation requirements. Bridges shall provide 2 feet of freeboard to the
low chord, above the 25-year storm event. Detailed bridge designs and calculations must be submitted to the County Engineer
for separate approval. The necessity for a bridge and its design criteria shall be determined on an individual basis.
Sec. XIX Public water system.
(1) Public water service shall be provided to every lot in every subdivision and to every development for both domestic use and
fire protection if public water is available. Water mains shall be connected to the existing public water system and extende d past
each lot. All water system improvements shall meet the standards for public water service of the providing jurisdiction. For the
purposes of this section, available shall mean an adequate water supply to serve both domestic use and fire prot ection (flows of
550 gallons per minute minimum) located adjacent to or within close proximity to the property being developed.
(2) Mains shall be at least 6 inches in diameter.
(3) If a public water system is not available nor under bid or contract to be available, the sub divider shall provide a wat er supply
using a community water system or individual wells in conformity with the regulations of DHEC, these development regulations,
and all other applicable laws and regulations. If a community water system is created, it must be designed to provide a minim um
fire flow of 550 gallons per minute.
Sec. XX Public sewerage system.
(1) Every lot in every subdivision and every development shall be connected to septic tanks or other on -site disposal systems in
accordance with the regulations of DHEC, these development regulations and all other applicable laws and regulations.
(2) If a community septic system is created, it must be approved by the Pickens County Public Service Commission (or other
providing jurisdiction when applicable).
Page 48 of 113
Roadway Design Standards and Policies
Pickens County
(3) If a subdivision or other development is requesting from Pickens County the ability to tie onto a public sewage conveyan ce
and treatment system, then all system improvements and construction shall meet the standards for public sewer service of the
providing jurisdiction.
Page 49 of 113
Roadway Design Standards and Policies
Pickens County
BLANK PAGE
Page 50 of 113
STATE OF SOUTH CAROLINA )
) ORDINANCE #_________________
COUNTY OF PICKENS )
AN ORDINANCE PROVIDING FOR CERTAIN AMENDMENTS TO PICKENS COUNTY CODE OF ORDINANCES
RELATED TO THE EFFICIENT, SAFE OPERATION AND MAINTENANCE OF THE COUNTY ROAD SYSTEM AND
MATTERS REALATED THERETO.
WHEREAS Pickens County, South Carolina (the “County”) is a political subdivision of the State of South Carlina and is
thereby authorized to enact regulations, resolutions, and ordinances, not inconsistent with the Constitution and general
law of this State, including the exercise of these powers in relation to health and order in counties or respecting any
subject as appears to them necessary and proper for the security, general welfare, and convenience of counties or for
preserving health, peace, order, and good government in them; and
WHEREAS, the County operates and maintains a system of highways, roads, and streets; and the efficient and safe
operations of such highways, roads, and streets requires certain amendments to the County’s existing Code of
Ordinances to further health, peace, order, and good government within the County;
NOW THEREFORE, BE IT RESOLVED that the Pickens County Code of Ordinances be amended as follows:
The provisions of Sections 1010 through 1018 (the road standards portion) of the United Development Standards
Ordinance as amended (the “UDSO”) are herby deleted in their entirety, with language substituted in the relevant section
of the UDSO as follow:
“Section 1010 Streets.
The provisions of Article IV of Chapter 32 of the Pickens County Code of Ordinances as amended (the “Road
Ordinance”) are incorporated herein by reference, and all standards are requirements found in the Road Ordinance shall
be controlling for all determinations necessary under the UDSO relevant thereto.”
The provisions of Section 32-101 is hereby amended as follows:
“Sec. 32-101(c) The County shall be the final authority to approve of disapprove connectivity of new streets or roadways,
whether inside or outside the jurisdiction of the County, to existing streets or roadways within the jurisdiction of County.”
The provisions of Sections 32-151 through 32-155 (Division 4 Roads) of the Pickens County Code of Ordinances are
hereby deleted in their entirety, with the language substituted in the relevant section as follows:
Page 51 of 113
“Sec. 32-151 - Purpose
This division is enacted to provide a means of maintenance of existing roadways which were previously admitted into the
County Road System as that do not meet the requirements of Division 2 herein.
Sec. 32-152 – Restrictions.
On existing dead end roads, at the point the roadway ceases to serve more than one residence or enters solely upon the
property of a single property owner situated at the end of the road, the county will determine the exact termination of
county maintenance. No county maintained roadway may be barricaded in any way and may not be posted with any
type sign such as “private”, “posted”, “keep out” or any other similar sign. The roadway shall remain open at all times for
use by the public at large as to local, state, and federal laws.
Sec. 32-155 – General procedures.
A. Definition. Roadways previously accepted into the county road maintenance system by the then-existing
policy are designated as “minimum maintenance roads”. These roads will be classified separately from all
other roads within the system and all roads accepted through provision of Division 2 herein.
B. Minimum maintenance designation shall remain until such time as the property owners themselves pay the
cost for the improvements needed to meet the requirements of Division 2 herein. The petitioners are solely
responsible for all necessary survey, deeds and costs associated with rights-of-way and agreements.
C. Minimum Maintenance Roads will be of the lowest priority for receiving attention by county maintenance
crews. Expenses for materials and labor shall be kept at a bare minimum.
The provisions of Chapter 32 – Roads and Bridges are hereby amended to include a new section as follow:
“Sec. 32-2 – County Road System
A. Definition. The County shall maintain a written inventory of all public highways, roadways, and streets not
currently maintained by the South Carolina Department of Transportation and not located within any
municipal boundary. Such inventory shall not include any private or private portion of roads.
B. All roads described in inventory referenced above shall comprise the County Road System. Additions or
deletions from the County Road System shall not be allowed except pursuant to provisions of this Chapter.
C. Subsequent to the passage of this Ordinance, the initial inventory of the County Road System shall be
published in a newspaper of general circulation for three (3) successive weeks. This inventory, and any
additions or deletions subsequent thereto, shall be kept in writing, and made available for public inspection
upon reasonable request at the office of the Pickens County Roads and Bridges Department.
Page 52 of 113
The Provision of Chapter 32 – Roads and Bridges are hereby amended as follows:
[PLACEHOLDER FOR UPDATES TO EXISTING ROADS ORDINANCE FROM UDSO DELETED PROVISIONS AND
OTHER AMENDMENTS DEVELOPED DURING COUNCIL MEETING ACTIONS]
Passed and approved, this _____ day of _______________________, 2025
COUNTY COUNCIL OF PICKENS COUNTY
SOUTH CAROLINA
________________________________________
Chris Bowers, Chairman of County Council
Pickens County, South Carolina
(SEAL)
Attest:
_____________________________________________________
Meagan Nations, Clerk of County Council
Pickens County, South Carolina
Page 53 of 113
Roadway Design Standards and Policies
Table of Contents Page
Sec. I Purpose of Roadway Design Standards and Policies 1
Sec. II Standards incorporated by reference. 1
2 (a) Standard Design Specifications. 1
2 (b) Traffic signs and street striping. 1
2 (c) South Carolina DOT standard specifications 1
2 (d) AASHTO design standards. 1
Sec. III Interpretation of standards. 1
3 (a) Governing Standards 1
3 (b) Prior Acceptance of Construction Plans 1
Sec. IV Design exceptions and field changes 2
4 (a) Request for Design Exception 2
4 (b) Field changes 2
Sec. V General design standards 2
5 (a) Suitability of the land 2
5 (b) Conservation. 2
5 (c) Conformance to the comprehensive plan and other adopted plans. 2
5 (d) Name of subdivision or development project. 3
5 (e) Street names. 3
5 (f) Street Addresses 3
5 (g) Blocks. 3
5 (h) Lots. 3
5 (i) Areas reserved for future development 4
5 (j) Plats & Developments Straddling Political Boundaries 4
Sec. VI Required improvements. 5
6 (a) Minor subdivisions. 5
6 (b) Major subdivisions, multi-family and nonresidential developments. 5
Sec. VII Guarantee in lieu of completed improvements. (2/16/10) 5
7 (a) Performance Surety 5
7 (b) Performance Surety Default 6
Table 10.1 6
Sec. VIII Survey Monuments 7
8 (a) Exterior development boundaries. 7
8 (b) Lot and street corners. 7
8 (c) Floodplain Elevations 7
Sec. IX Easements. 7
9 (a) Utility easements. 8
9 (b) Pedestrian Easements 8
Page 54 of 113
9 (c) Drainage and access easements 8
9 (d) Conservations easements. 8
9 (e) Overlapping easements 8
Sec. X Streets 8
10 (a) Access. 8
10 (b) Street classifications. 9
10 (c) Traffic Study Policy 9
10 (d) Relation to present and future street system. 12
10 (e) Design standards for streets. 12
Table 10.2: Minimum Right-of-Way Width 13
Table 10.3: Street Grades and Design Speed 14
Figure 10.2 Reverse Curves 14
Table 10.4 Intersection Offset 14
Figure 10.3 Intersection Offsets 14
Figure 10.4 Mitered Right-of-Way 15
Table 10.5: Minimum Sight Distance 15
Figure 10.5 Sight Distance 16
Figure 10.6 Interim Turn-Arounds 18
Figure 10.7 Cul-de-sac Dimensions 19
Figure 10.8 Subsurface Drainage 21
Figure 10.9 Entry Island Layout 22
Figure 10.10 Island Detail 22
Figure 10.11 Intersection/Driveway Grades 23
10 (f) Street Improvements 23
Table 10.6: Street Base and Pavement 24
10 (g) Substandard streets. 27
10 (h) Street Abandonment 27
Sec. XI Private residential access. 28
11 (a) Shared driveways. 28
11 (b) Common drive. 29
11 (c) Shared Drive / Common Drive Hybrid 29
11 (d) Private Roads. 30
Sec. XII Street signs, traffic signs and striping. 31
12 (a) Street name signs. 31
12 (b) Traffic Signs 31
12 (c) Striping Requirements 31
Sec. XIII Street Lights 31
Sec. XIV Driveway and Development entrances. 32
14 (a) Encroachment Permit 32
14 (b) Driveway access to a State road. 32
14 (c) Driveway access to major County roads. 32
Page 55 of 113
14 (d) Driveway standards; in general. 32
14 (e) Residential subdivision entrances. 32
14 (f) Commercial/Industrial subdivision entrances 33
14 (g) Driveways for multi-family and non-residential developments. 33
14 (h) Maintenance of sight distances 33
Sec. XV Deceleration lanes and turn lanes. 33
15 (a) Deceleration lanes; where required. 33
15 (b) Median breaks. 34
15 (c) Deceleration and turn lane constructions standards. 34
Sec. XVI Sidewalks. 34
16 (a) Sidewalks; where required. 34
16 (b) Sidewalks; where located. 34
16 (c) Sidewalks; construction. 34
16 (d) Crosswalks 35
Sec. XVII Location of utilities and street cuts. 35
17 (a) Location of utilities in streets. 36
Sec. XVIII Storm drainage 36
18 (a) Applicability and exemptions 36
18 (b) Standards to be used in designing system: 37
Sec. XIX Public water system. 38
Sec. XX Public sewerage system. 39
Page 56 of 113
BLANK PAGE
Page 57 of 113
1
Roadway Design Standards and Policies
Sec. I Purpose of Roadway Design Standards and Policies
This Article establishes the comprehensive standards and procedures governing the design, construction, acceptance,
classification, maintenance, and abandonment of all public and private roadways, streets, and related infrastructure within
Pickens County. It is intended to serve as the unified and controlling authority for all roadway matters under County jurisdiction,
ensuring safe, consistent, and coordinated development and management of the County’s transportation network.
Additionally, this a rticle sets out the minimum requirements and standards for construction of subdivisions and other land
development projects, including general principles of design and layout and requirements for such public facilities as street s and
utilities.
Low impact development procedures may be used where practical. Grass swales, pervious pavements and other best
management procedures may be used where storm water velocities and quantities allow. Each low impact practice will be
approved on a case-by-case basis.
Sec. II Standards incorporated by reference.
2 (a) Standard Design Specifications.
The Standard Design Specifications of Pickens County, also referred to in this Ordinance as “Standard Details,” as adopt ed by
the County Council and as may be amended from time to time are incorporated into this Ordinance as though set forth within th e
body of this Ordinance. In the case of a conflict between the Standard Design Specifications and the text of this Ordinance, the
text shall control.
2 (b) Traffic signs and street striping.
The installation of all traffic control signs and street striping shall be governed by the standards contained in the Manual on
Uniform Traffic Control Devices, latest edition, published by the Federal Highway Administration of the U.S. Department of
Transportation.
2 (c) South Carolina DOT standard specifications.
Unless otherwise specially set forth in this Ordinance or the Standard Design Specifications of Pickens County, all of the materials,
methods of construction, and workmanship for the work covered in reference to street construction and storm drainage construction
shall conform to the latest standard specifications of the South Carolina Department of Transportation.
2 (d) AASHTO design standards.
Design criteria and standards not specifically set forth herein shall conform to the latest edition of the AASHTO Policy on
Geometric Design of Highways and Streets.
Sec. III Interpretation of standards.
In the interpretation and application of the provisions of these standards, the following shall govern:
3 (a) Governing Standards
Whenever a provision of these standards or any provision in any law, ordinance, resolution, rule, or regulation of any kind
contains any restrictions covering any of the same subject matter, the standards that are more restrictive or impose higher
standards or requirements shall govern.
3 (b) Prior Acceptance of Construction Plans
Pickens County shall not modify or alter any development plans that have been filed with and accepted by the County prior to the
effective date of this code. This exception shall be subject to the conditions and limitations under which said plans were
accepted by the County.
Page 58 of 113
2
Sec. IV Design exceptions and field changes.
4 (a) Request for Design Exception
When unique conditions and circumstances exist on a project, the developer’s engineer may submit a request for design
exception in a format provided by the County Engineer. Design exceptions request should be identified as early as possible
during the design process. The County Engineer is the approval authority for design exceptions. Any design exception request
not considered by the County Engineer, or otherwise not approved, may be forwarded to the Planning Commission for their
review and consideration.
4 (b) Field changes
Minor changes in construction plans caused by field conditions shall be made at the direction of the County Engineer with the
cost of such changes to be paid by the developer. All changes are to be documented as revisions to the approved development
plans and correctly shown on the as-built surveys. Discrepancies between the as-built surveys and the approved development
plans may result in delays in approving final plats or certificates of occupancy.
Sec. V General design standards.
5 (a) Suitability of the land.
(1) Land physically unsuitable for subdivision or development because of flooding, poor drainage, topographic, geologic or o ther
such features that may endanger health, life or property, aggravate erosion, increase flood hazard, or necessitate excessive
expenditures of public funds for supply and maintenance of services shall not be approved for subdivision or development unles s
adequate methods are formulated by the developer for solving the problems. Such land shall be set aside for such uses as shal l
not involve such a danger.
(2) Land within a proposed subdivision or development which is unsuitable for development shall be incorporated into the
buildable lots as excess land or may be utilized as open space. Lots that do not comply with the requirements of this Ordinan ce
are prohibited.
5 (b) Conservation.
(1) Development shall be planned, designed, constructed and maintained to avoid substantial probabilities of:
a. Accelerated erosion.
b. Pollution, contamination, or siltation of lakes, rivers streams, and other water bodies.
c. Damage to vegetation.
d. Injury to wildlife and fish habitats.
(2) Development shall be planned, designed, constructed and maintained to provide open space and to create a man -made
environment for human use or occupancy compatible and harmonious with the natural environment and specific consideration
shall be given to the preservation of natural topography, to preservation of existing vegetation, to retention of major land forms
and to preservation of important vistas.
5 (c) Conformance to the comprehensive plan and other adopted plans.
In addition to the requirements established herein, all subdivisions and individual development projects shall comply with th e
following laws, rules and regulations:
(1) All proposed subdivisions and individual development projects shall conform to the Comprehensive Plan and development
policies in effect at the time of submission to the Planning Department.
(2) All highways, major thoroughfares, streets and other transportation facilities shall be platted by the developer in the location
and to the dimension indicated on the Comprehensive Plan or the County Transportation Plan, if applicable, whichever is th e
most recently adopted or amended.
Page 59 of 113
3
(3) When features of other plans adopted by the County Council (such as school sites or other public -building sites, parks or
other land for public uses) are located in whole or in part in a subdivision, such features shall be either dedicated or rese rved by
the subdivider for acquisition within a reasonable time by the appropriate public agency.
a. Whenever a plat or site plan proposes the dedication of land to public use that the County Council finds to be
not required or suitable for such public use, the County Council shall refuse to accept the dedication.
(4) In subdivisions or developments related to or affecting any State or U.S. numbered highway, the Planning Department shal l
require the approval of the South Carolina Department of Transportation.
(5) Any and all rules of the South Carolina Department of Health and Environmental Control (DHEC), the USDA Natural
Resource Conservation Service, and all other appropriate state and federal agencies.
5 (d) Name of subdivision or development project.
The name of each subdivision or development project must have the approval of the Planning Department. The name shall not
duplicate nor closely approximate the name of an existing subdivision or development project in Pickens County or any of its
cities.
5 (e) Street names.
(1) Street names.
a. Proposed streets obviously in alignment with other existing and named streets shall bear the names of the
existing streets. In no case shall the name for a proposed street duplicate existing street names in Pickens County.
b. Street names are subject to approval by the E911 Addressing Coordinator.
5 (f) Street Addresses
Street addresses shall be obtained from the E911 Addressing Coordinator and shall be shown upon each final plat. Numbers
must be visible from the street. The size of the address numbers must be a minimum of three (3) inches tall.
5 (g) Blocks.
1) Residential Blocks.
Unless otherwise approved by the County Engineer under unusual circumstances, block lengths shall not exceed twelve hundred
(1,200) feet nor be less than four hundred (400) feet in length.
a. In blocks greater than 1,200 feet in length, the County Engineer may require one or more public easements of not less
than twenty (20) feet in width to extend entirely across the block for pedestrian crosswalks, fire protection or utilities.
b. Width: Blocks shall be wide enough to allow two rows of lots, except where reverse frontage lots on major
thoroughfares are provided, or when prevented by topographic conditions or size of the property, or for lots along the
periphery of the subdivision, or where abutting upon limited access highways or railroads, or where other situations
make this requirement impractical, in which case the Planning Department and County Engineer may approve a single
row of lots.
2) Nonresidential Blocks.
Blocks for other than residential use shall be of such length and width as may be suitable for the prospective use, including
adequate provision for off-street parking and service.
5 (h) Lots.
(1) Minimum lot dimensions and areas.
All lots shall meet or exceed the area and dimensional requirements of this Development Ordinance.
(2) Authority of SCDES.
Nothing contained in this Article shall be construed as preventing the SCDES, after study of the conditions existing in a proposed
subdivision, from requiring that all or any portion of the area of such subdivision shall not be built upon or that the minim um lot
Page 60 of 113
4
sizes set forth in this Development Ordinance are inadequate and must be increased to ensure the protection of the public
health.
(3) Adequate building sites.
Each lot shall contain a site large enough for a normal building that will meet all building setback requirements as set forth in this
Ordinance and not be subject to flood or periodic inundation.
(4) Arrangement.
If possible, all lot lines that intersect a street line shall be perpendicular or radial to said street lines unless not prac tical or
desirable because of topographic or other features, such as the location of a stream or other natural feature that more
appropriately may define a lot, or a property line that forms the periphery of a subdivision that is not perpendicular or radia l to a
street line. Exceptions to this requirement must be approved by the Director of Community Development at the time of
Preliminary Plat approval or otherwise prior to recordation of the lot. In no case shall a lot be created that would require a
variance to provide an adequate area to accommodate a normal principal building.
(5) Corner Lots.
Corner lots shall be sufficiently large to permit the location of buildings so as to conform to the front building lines on b oth streets.
(6) Through lots.
Except where specifically required to provide reverse frontage separation from a County road or a State or U.S. numbered
highway, or to overcome specific disadvantages of topography and orientation of property, through lots (i.e., “double - frontage”
lots) are to be avoided.
5 (i) Areas reserved for future development
If any portion of a tract is reserved for future subdivision development, the minimum lot width and frontage of the reserved area
may be reduced to the width required for a future street to serve such area.
(1) Such a reserved area must be labeled “Reserved for Future Development” on the final subdivision plat, and the portion of the
lot where a street will be built must be labeled “Future Street.”
(2) Such a reserved area will not be eligible for issuance of a building permit unless the lot meets all requirements of thi s
Development Ordinance, including minimum lot width and frontage requirements.
5 (j) Plats & Developments Straddling Political Boundaries.
Page 61 of 113
5
Whenever access and/or services to a subdivision is required across land in another governmental jurisdiction, the Planning
Department may request assurance from the County Attorney, and/or the other county, and/or other municipality that access is
legally established, and that the access road is adequately improved. In general, lot lines shall be laid out so as to not cross
jurisdictional boundary lines. Any necessary intergovernmental agreements must be executed prior to the issuance of a
Development Permit. The developer and/or property owner has an affirmative duty at the time of application for land use
approval or development permit (if land use approval has already granted or not required) application to request with the aff ected
governments that they enter into an intergovernmental agreement process. The County makes no guarantee to enter into any
intergovernmental agreement.
Sec. VI Required improvements.
6 (a) Minor subdivisions.
By definition, a minor subdivision does not involve the construction of major public improvements, such as new streets or
stormwater detention. However, the following improvements are required in order to adequately serve the lots and protect the
safe operation of the existing road:
1) Right-of-way shall be delineated along the property’s frontage from the centerline of the existing road equal to ½ of the
minimum requirement for the classification of the road, as established in this Article or otherwise specified by SCDOT.
2) The potential location of a driveway connection serving each lot and meeting the requirements of these development
regulations shall be indicated on the final subdivision plat.
3) The stormwater carrying capacity of the road, whether in an existing ditch or gutter, shall not be compromised. If the
stormwater characteristics of the existing road are inadequate to accommodate the new lots, the County Engineer may
require improvement of the roadway ditch as appropriate.
4) All lot corners shall be marked according to the Minimum Standards Manual for the Practice of Land Surveying in South
Carolina.
6 (b) Major subdivisions, multi-family and nonresidential developments.
The following improvements shall be provided by the developer or at the developer’s expense in every major subdivision or
individual multi-family or nonresidential development in accordance with the requirements and standards contained in this Article.
(1) Survey monumentation in accordance with Sec. 1008.
(2) Streets providing access to such a development and to all lots in such a subdivision, including the extension of streets
required to provide access to adjoining properties, in accordance with Sec. 1010.
a. Streets contained wholly within such a subdivision shall be improved to the full standards contained in this
Article.
b. Curb and gutter as required by Sec. 1010(e)(4).
(3) Street name signs, stop bars, striping and traffic control signs as approved by the County shall be paid for by the deve loper
and installed by the developer in accordance with Sec. 1013.
(4) Driveway access to each lot, and project access improvements (deceleration, turn lanes, etc.) as deemed necessary by the
County Engineer under the provisions of Sec. 1015 and Sec. 1015.
(5) Sidewalks, if required under Sec. 1017.
(6) Storm water drainage and detention facilities in accordance with Sec. 1019. (7) Public or private water supply as requi red
under Sec. 1020.
(8) Public or private sanitary waste disposal as required under Sec. 1021.
Sec. VII Guarantee in lieu of completed improvements. (2/16/10)
7 (a) Performance Surety
Page 62 of 113
6
No final subdivision plat shall be approved by the County or accepted for recordation by the Register of Deeds, nor shall any lot
within the development be sold or transferred until one of the following conditions has been met:
(1) All public improvements shall have been properly installed and completed in accordance with all requirements and standar ds
of this Development Ordinance and an as-built survey of the improvements shall have been approved by the County Engineer;
or,
(2) Pickens County has received a performance surety in the form of a letter of credit or surety bond issued by a financial
institution with a presence in South Carolina or otherwise licensed to provide such services in South Carolina in the amount of
125% of the estimated cost of installation of the required improvements.
(3) For residential developments, the improvements funded through the performance surety shall be limited to final pavement
topping for streets, storm drainage infrastructure, curbing, grassing of street shoulders, landscaping, and street striping.
For commercial or industrial developments with public infrastructure, it must cover the base, asphalt, grading, storm drainag e.
(4) The developer shall submit actual cost estimates prepared by the developer’s engineer, contractor, or subcontractors to the
Planning Department. The Planning Department, along with the County Engineer, will perform a cost analysis for such
infrastructure covered under any proposed surety. If such analysis generates a higher estimate than the estimates submitted by
the developer, the higher of the two estimates will be used to determine the bond amount.
(5) Completion of the improvements covered under the performance surety shall be accomplished within twelve (12) months of
the approval of the final subdivision plat.
(6) Upon completion of any deferred improvements:
a. The as-built plans are to be updated by the developer and submitted to the County Engineer;
b. A letter from the County Engineer authorizing the release of the surety shall be provided;
c. A maintenance surety required under Sec. 1102(e) shall commence for the completed deferred
improvements.
7 (b) Performance Surety Default
If at any point in the schedule shown in Table 10.1, below, the County Engineer determines that the installation of infrastru cture
is not progressing as outlined in the schedule or that the developer is not working in good faith to bring the infrastructure to
County standards, the County may declare the developer in default and can proceed to secure the proceeds of the surety in
order to complete the installation of the infrastructure.
Page 63 of 113
7
Sec. VIII Survey Monuments
8 (a) Exterior development boundaries.
(1) An iron pipe or ½–inch iron pin at least twenty-four (24) inches long shall be placed at all corners of the exterior boundaries
of the subdivision or development project being developed. (2/16/10)
(2) Existing permanent monuments that, in the professional opinion of a registered land surveyor, are of sufficiently durabl e
construction shall be marked and maintained.
(3) Other, more suitable permanent materials may be used as noted in the Standards of Practice Manual for Surveying in South
Carolina, if such material provides for a permanent reference. (2/16/10)
8 (b) Lot and street corners.
(1) All other street or lot corners shall be marked with an iron pipe or ½ –inch iron pin at least twenty-four (24) inches long.
(2/16/10)
(2) All such monuments shall be properly set in the ground and shall be approved by a registered land surveyor prior to the time
of final plat approval.
(3) Other, more suitable permanent materials may be used as noted in the Standards of Practice Manual for Surveying in South
Carolina, if such material provides for a permanent reference. (2/16/10)
8 (c) Floodplain Elevations
On developments containing floodplains, flood elevation references shall be set and noted on all plans and associated plats.
Sec. IX Easements.
Page 64 of 113
8
Easements shall be required in connection with subdivisions or developments for the following purposes, among others:
9 (a) Utility easements.
(1) Utility easements for private utilities shall be avoided except in cases where no other satisfactory arrangements can be
provided for the installation of private utilities.
(2) Whenever it is necessary or desirable to locate a public utility line outside of the street right -of-way, the line shall be located
in an easement dedicated to the County (or other appropriate public entity) for such purpose. Easements for water and s anitary
sewers shall be a minimum of 20 feet wide, and may be required to be wider depending on the depth of cut to maintain a 1:1
open cut slope. When warranted, temporary construction easements widths shall be as required by the County.
(3) Easements for sanitary sewers may be required by the County Engineer or public sewage provider for future extension of
lines, whether or not the subdivision or development is currently proposed to be served by public sewer.
9 (b) Pedestrian Easements
Pedestrian easements not less than ten (10) feet wide, may be required where deemed essential to provide circulation, or
access to schools, playgrounds, shopping centers, transportation, and other community facilities.
9 (c) Drainage and access easements.
(1) Drainage easements shall be cleared and opened for a closed stormwater or drainage system of adequate width and
capacity at the time of development to control surface water run-off. Run-off slopes and side slopes shall be specified by the
developer’s engineer according to good engineering practices.
(2) A publicly dedicated drainage easement is to be provided along any manmade drainage channel or drainage pipe located
outside a street right-of-way. All easements shall be no less than twenty (20) feet wide when used as an open ditch. Piped storm
drainage shall have a minimum easement width of twenty (20) feet wide.
(3) Drainage easements off the street right-of-way shall be clearly defined on the plat and deed of the individual property owner,
and such property owner shall keep the easement free of obstructions and maintain that part of the easement within the prope rty
owner’s boundary line so that free and maximum flow is maintained at all times. The property owner shall not alter any draina ge
improvements without the prior written approval from the County.
9 (d) Conservations easements.
Conservation easements, as may be required by this Development Ordinance shall be clearly defined on the plat and deed of the
individual property owner, and must conform to the requirements set out for such easements
9 (e) Overlapping easements.
Easements for water, sanitary sewers and drainage purposes may be combined, but must be a minimum of thirty (30) feet if in
combination. Any easement containing more than one pipe must provide at least 10 feet beyond the pipe and the pipes must be
at least ten (10) feet apart (measured on center). Wider easements shall be required when necessary to maintain a 1:1 open cut
slope to each pipe.
Sec. X Streets.
10 (a) Access.
(1) A publicly approved street meeting the requirements of this Article shall serve every development and every lot within a
subdivision. Private streets, when constructed and approved according to Section 1010(c), are permitted.
(2) Every development and every major subdivision shall have access to the public street system via a standard County road o r
an approved private street. A building permit shall not be issued unless continuous road access between the property and the
public street system is provided by a publicly dedicated street or an approved private street.
(3) A building permit shall not be issued on any property that does not front on or have approved access to a publicly dedic ated
street or an approved private street, in accordance with the minimum lot frontage and access easement provisions of this
Development Ordinance.
Page 65 of 113
9
(4) When land is subdivided into larger parcels than ordinary building lots, such parcels shall be arranged and designed so as to
allow for the opening of future streets and to provide access to those areas not presently served by streets.
(5) No subdivision or development shall be designed in a way that would completely eliminate street access to adjoining parc els
of land.
(6) Reserve strips which control access to streets, alleys and public grounds shall be prohibited unless their control is pl aced in
the hands of the County under ownership, dedication, or easement conditions approved by the County Attorney and the County
Engineer.
(7) Subdivision streets that intersect a State or U.S. numbered highway, a County arterial or County collector road shall do so at
intervals of not less than five hundred (500) feet, or as required by the South Carolina Department of Transportation, which ever
is greater. On all other roads, at least two hundred fifty (250) feet must separate street intersections on the same side of the
road, measured centerline to centerline. Compliance with sight distance requirements of this Development Ordinance may
require greater distances between street intersections.
10 (b) Street classifications.
Streets are classified according to the function that they serve, the type, speed, and volume of traffic they will carry and the
required standards of design. The classifications of streets and roads are as follows:
(1) Principal Arterials.
These roads, which include interstates and rural freeways: serve "substantial" statewide or interstate trips, as defined by h igh
mileage or volume; connect most urban areas of twenty-five thousand (25,000) or more and virtually all urban areas of fifty
thousand (50,000) or more; and provide an integrated network without stub connections except where geography dictates
otherwise.
(2) Minor Arterials.
With the principal arterial system, these roads form a rural network that links other cities, larger towns, and other traffic
generators, such as major resort areas, capable of attracting travel over long distances; links all developed areas of the st ate;
and serve corridors with trip lengths and travel density greater than those predominantly served by rural collector or local
systems. Minor arterials therefore constitute routes whose design should be expected to provide for relatively high overall t ravel
speeds, with minimum interference to through- movement.
(3) Major Collectors. These roads, with minor collectors, primarily serve the county rather than state traffic. Consequently, more
moderate speeds are typical. They serve any county seat or larger town not on an arterial route, and other traffic generators of
equivalent intra county importance, such as consolidated schools, shipping points, county parks, and important mining and
agricultural areas; link the latter places with nearby larger towns or cities, or arterials and freeways; and serve the more important
intra county travel corridors.
(4) Minor Collectors.
Serving county-wide traffic, these roads should evenly collect traffic from local roads and bring all developed areas within a
reasonable distance of a collector road; provide service to the remaining smaller communities; and link the locally important
traffic generators with the hinterland.
(5) Local Roads.
These roads serve primarily to provide access to adjacent land and serve low - mileage trips as compared to collectors or other
higher systems. Local roads constitute the rural mileage not classified as part of the principle arterial, minor arterial, or collector
systems.
10 (c) Traffic Study Policy
(1) Overview.
Under the current wave of growth Pickens County is experiencing, one of the greatest causes of concern is the traffic
impact these various projects have and will continue to have on our community. There are frequent calls for a developer
to do a “traffic study”. In an effort to standardize when a study is required, what type or types of studies are required,
the geographic range of the study and how far into the future the study should consider traffic patterns, the County is
Page 66 of 113
10
proposing a Traffic Study Policy which will define these terms and automatically trigger the appropriate traffic research
on a case-by-case basis.
(2) Purpose.
The purpose of the Pickens County Traffic Study Policy is to standardize the requirements for various development -
related traffic studies in Pickens County. By establishing a set of metrics tied to best practices and commonly accepted
data, the decision to require or not require a traffic study shall be made based on empirical data.
(3) Triggers for a traffic study being required.
The following chart shows the type and scope of traffic studies required for various projects:
Development
trips/day generated
Traffic Impact
Analysis
Traffic Circulation
Analysis
Traffic
Volume Study
Speed
Study
Origin &
Destination Study
Traffic
Capacity Study
0-500 None1 None1 None1 None1 None1 None1
501-1000 Required None1 None1 None1 None1 Required
1001-1250 Required Required None1 None1 None1 Required
Greater 1250 Required Required Required Required Required Required
1 Unless a development has a single entrance on an existing road that has previously had a traffic volume study that stated
that the road was at capacity after previous development and would require structural changes to accommodate additional
traffic flow.
(4) Required Actions and Range of Study Based on Triggers:
Development
trips/day generated
Peak Hour
Calculation
Un-signalized
intersection range
Signalized Intersection
range
Future Time
Horizon
Traffic Capacity
Study
0-500 Yes
501-1000 Yes ¼ mile Nearest Commuter Corridor 10 years 1 mile
1001-1250 Yes ½ mile Nearest Commuter Corridor 15 years 1.5 miles
Greater 1250 Yes 2 miles Nearest Commuter Corridor 20 years 2 miles
(5) Trip Generation - Trip Generation calculations shall follow the most current Edition of the ITE (Institute of
Transportation Engineers). At the time of adoption of this policy the most current edition is the Eleventh (11th).
(6) Roadway/Paving Impact Analysis:
Based on the outcome of the studies outlined above, the County Engineer shall review the data and make a
recommendation regarding, but not limited to:
• Roadway widening
• Addition of travel lanes
• Acceleration, deceleration, turning, or queuing lanes
• The addition or removal of sidewalks
• The addition or removal of bust stops
• Curb/stormwater management work
• Intersection signage including full signalization
Page 67 of 113
11
• Other signage as necessary
• Parking study
• Addition of bike lanes or multimodal pathways
(7) Notes and Addendum
The County reserves the right to require traffic studies based on unique factors specific to a particular project or
location.
(8) Defintions
Average Daily Trips - Average Daily Trips (ADT} are the total number of trips, both in-bound and out-bound, within
a 24 hour weekday period, generated by a particular use or development.
Pass-By Trip - Trips generated by the proposed Project that would be attracted from traffic passing the proposed
project site on an adjacent street that contains direct access to the Project.
Peak Hour Trip - Peak Hour Trips are vehicle trips, both in -bound and out -bound, occurring during a one hour
period either during the AM Peak (7AM to 9AM} or the PM Peak (4PM to 6PM}, generated by a particular use or
Project.
Project - A Project subject to this policy encompasses all land use development projects affecting the built
environment, including changes in occupancy or intensification of existing uses, over which the City has
administrative or legislative authority, that require review and approval and issuance of a building permit, certificate
of occupancy, or other land use approval by County staff, Commissions, or Council.
Traffic Count - A traffic count is a count of traffic along a particular road, either done a digital counter (hose),
electronically via photography and OCR technology, or by human counters.
Traffic Impact Analysis (TIA) – A TIA is provided to assess the near -term and long -term effects of specific
development activity on the roadway system in a comprehensive manner. Development activity may include
rezoning, platting, development plan approvals, Thoroughfare Plan amendments, and annexations.
Traffic Circulation Analysis (TCA) – A TCA is provided to determine how a development's traffic relates to existing
traffic on internal and adjacent roadways. A TCA can be required during the same stages of the development
process as a TIA, or it can be re quired at the time of building permit, driveway permit, development plan, or
certificate of occupancy. A TCA is smaller in scope and magnitude than a TIA and focuses primarily on localized
impacts.
Traffic Volume Study - Traffic volume studies are conducted to determine the number, movements, and
classifications of roadway vehicles at a given location. The data helps to identify critical flow time periods,
determining the influence of large vehicles or pedestrians on vehicular traffic flow.
Speed Study - Spot speed studies are conducted to estimate the distribution of speeds of vehicle in the traffic
stream at a particular position on highway. This is done by recording the speeds of vehicle at the specified location.
Origin and Destination Study - An origin-destination study is used to determine travel patterns of traffic on an
installation during a typical day. This is a study to determine and analyze trips. Trips are defined as one -way
movement, from where a person starts (origin) to where the person is going (destination).
Traffic Flow Characteristics - Traffic flow is the study of the movement of individual drivers and vehicles between
two points and the interactions they make with one another.
Traffic Capacity Study - A traffic capacity study is done to determine the maximum number of vehicles in a lane or
a road that can pass a given point in unit time per hour per lane or roadway. The traffic capacity indicates a
capability or maximum rate of flow with a certain level of service characteristics that can be carried by the road.
The traffic capacity of a roadway depends upon a number of prevailing roadways and traffic conditions.
Parking Study - A parking study is defined as the ratio of number of bays occupied in a time duration to the total
space available. It gives an aggregate measure of how effectively the parking space is utilized.
Page 68 of 113
12
Roadway/Paving Impact Analysis - This is recommended by the County Engineer to determine the ability of a
given section of roadway to handle any proposed increase of various types of traffic based upon a proposed
development.
10 (d) Relation to present and future street system.
(1) The street pattern within a development or subdivision shall provide for the continuation or appropriate projection of t he
existing street pattern or anticipated development, if any, at the same or greater width, but in no case less than the requir ed
minimum width. Topography, natural features such as streams and tree growth shall be considered.
(2) Existing streets that adjoin a development or subdivision boundary shall be deemed a part of the subdivision. T he
proposed street system within a subdivision shall have the right-of-way of existing streets extended no less than the required
minimum width. Subdivisions that adjoin only one side of an existing street shall delineate one -half of the additional right-of-way
needed to meet the minimum width requirement for the street. If any part of the subdivision includes both sides of an existing
street, all of the required additional right-of-way shall be delineated.
(3) All right-of-way required for off-site improvements shall be acquired by the developer at no expense to Pickens County. If the
Developer is unable to acquire the right-of-way, the Pickens county attorney shall initiate acquisition proceedings, at the expense
of the developer, after authorization by the Pickens County Council
(4) Where, in the opinion of the County Engineer, it is necessary to provide for inter - parcel access to adjoining property,
proposed streets shall be extended by delineation of right-of-way to the boundary of such property and existing streets through
the development.
(5) Subdivisions shall be laid out so as to discourage through traffic on local streets.
However, the provision for the extension and continuation of arterial and collector streets into and from adjoining areas is
required.
(6) Where a subdivision abuts or contains an existing or proposed arterial street, the County Engineer shall require marginal
access streets, single tier lots, or such other treatment as will provide protection for abutting properties, reduction in th e number
of intersections with the arterial street, and separation of local and through traffic.
(7) Where no street exists or where the adjoining property is in alignment with a proposed street, a temporary turnaround shal l
be provided at the boundary of the property.
10 (e) Design standards for streets.
(1) Arterial Streets.
All State or U.S. numbered highways shall meet all design requirements of and be approved by the South Carolina Department
of Transportation. All County arterials that are not State or U.S. numbered highways shall meet all design requirements of th is
Development Ordinance.
(2) Local and Collector Streets.
All local and collector streets shall comply with the design and construction requirements of this Development Ordinance, except
that all State or U.S. numbered highways and roadways shall meet all design requirements of and be approved by the South
Carolina Department of Transportation. Traffic calming devices, when warranted (see Speed Bump Ordinance – Sec. 32-114),
shall be installed in all residential and commercial developments. The County Engineer must approve the installation of any
calming device.
(3) Minimum width of right-of-way. Minimum width of right-of-way measured from lot line to lot line shall be as shown on Table
10.2. Additional right-of-way may be required to accommodate turn lanes, deceleration lanes or other road improvements.
Page 69 of 113
13
(4) Additional Right-of-Way.
a. Subdivisions which include an existing street that does not conform to the minimum
right-of-way requirements of this Ordinance shall provide additional width along one or both sides of such
street or road so that the minimum right-of-way required by this Article is established if lots front on the
existing street. Subdivisions abutting only one side of such a street or road shall provide a minimum of one -
half of the right-of-way required by these regulations measured from the center of the existing right-of-way.
b. When a future street or road, as proposed in the Comprehensive Plan or otherwise delineated by County
Council, adjoins or traverses the subdivision or development project, the future right -of-way shall be platted
as part of the subdivision or development project. No development will be allowed within the platted future
right-of-way except for drives and landscaping, and the platted future right-of-way is to be treated as a lot line
for the provision of all setback lines as required by this Article.
c. When warranted by topography or other utility placement, on local residential streets with a fifty (50) foot
right-of-way, additional property for a permanent utility maintenance easement shall be established adjacent
to the right-of-way.
(5) Vertical alignment of streets.
a. All streets shall have a minimum centerline grade of one half percent )0.5%) for curb & gutter sections, and
one third percent 0.33% for ditch sections. Minimum grade on a cul-de-sac shall be one percent (1%).
b. Minimum design speeds and maximum grades for proposed streets by street classification shall be as
shown on Table 10.3. Design exceptions must be justified and approved by the County Engineer.
c. Vertical curves intersecting tangents of less than 10% shall use a ‘K” factor of
16 for a crest vertical curve and a factor of 24 for a sag vertical curve. This shall be valid for a speed limit of
twenty- five miles per hour or less. Center- line tangents intersecting greater than 10% shall be approved by
the County Engineer on a case by case basis, with sight distances being the major determining factor.
Page 70 of 113
14
(6) Horizontal alignment of streets.
a. See SCDOT Design Manual – Chapter 5 – for minimum radii on horizontal curves.
b. Reverse curves in the street right-of-way should be avoided but may be approved by the County engineer at
his discretion (see Figure 10.2)
c. Street jogs shall have a centerline offset of no less than as shown in the following table and figure:
Page 71 of 113
15
d. Intersections. All streets shall intersect at no less than seventy-five (75) degrees, and as near a right angle
as possible. The angle of intersection is to be measured at the intersection of
the street center- lines. Such intersecting streets shall provide an uninterrupted line of sight from the center
point of the inter- section for not less than the minimum sight distance required in accordance with this
Development Ordinance.
e. Multiple intersections involving the junction of more than two streets shall be prohibited unless otherwise
approved by the County Engineer.
f. Curb lines at street intersections shall have a radius of curvature of not less than twenty -five (25) feet. Where
the angle of street intersection is less than ninety (90) degrees, a longer radius may be required.
g. Intersecting street right-of-way lines shall parallel the back of curb of the roadway, and shall be mitered
twenty (25) feet along both streets from the point of the right-of-way lines projected to their intersection. See
Figure 10.4.
(7) Minimum sight distance.
a. Sight distance requirements at intersections and driveways shall be as shown on Table 10.5. In general, the
sight distance requirement is based on a passenger car entering a two-lane highway and shall be adjusted if
the development typically uses larger vehicles or is entering a highway with more than two lanes. See
SCDOT ARMS manual for further guidance.
Page 72 of 113
16
Table 10.5: Minimum Sight Distance
Intersection Sight Distance, Vehicles Approaching from the Left and For
Vehicles Approaching from the Right on a Two-Lane Highway or Street
Only
Design Speed
(Vmajor)
(mph)
Intersection Sight Distance (Feet)
Passenger
Car
Single Unit
Truck Tractor/Semitrailers
15 170 210 255
20 225 280 340
25 280 350 425
30 335 420 510
35 390 490 595
40 445 560 680
45 500 630 765
50 555 700 850
55 610 770 930
60 665 840 1015
Note: These ISD values assume a minor road approach grade less
than or equal to 3 percent. For grades greater than 3 percent,
increase the ISD value by 10 percent.
b. The design speed for sight distance requirements at entrance intersections shall be the existing posted
speed limit.
c. Distances shall be measured from a point on the centerline of the entering road or driveway 15 feet
back from the edge of the nearest trafficway in the abutting street, and extending in both directions along the
abutting street.
1. Minimum sight distances are to be measured from the driver’s eyes, which are assumed to be
three and a half (3.5) feet in height above the pavement surface, to an object two (2) feet above the
pavement in the center of every on- coming travel lane.
2. The sight distance shall be clear along its entire minimum length and un- impaired by intervening
changes in street grade, horizontal alignment or obstructions. Examples of obstructions are
vegetation, ground cover, signs, existing topography, etc.
Page 73 of 113
17
Figure 10.5 Sight Distance
(8) Dead-end streets.
a. Dead-end street length.
1. A dead-end street shall be no more than twenty-five hundred (2500) feet long unless necessitated
by topographic or other conditions and approved by the County Engineer.
2. Where a dead-end street exceeds twenty-five hundred (2500) feet in length, the County Engineer
shall require one or multiple interim turn around(s) to be provided.
Page 74 of 113
18
3. A dead-end street shall have a length of no less than one hundred twenty-five (125)
feet.
4. The length of a dead-end street shall be the distance along the centerline of the dead-end street
measured from the centerline of the intersecting street to the center point of the turnaround radius.
5. Other cul-de-sac designs may be considered by the County Engineer on a case by case basis.
b. Turnaround dimensions.
1. Dead-end streets in residential subdivisions shall terminate in a circular turnaround having a
minimum right-of-way of at least fifty (50) feet in radius, and a paved turnaround with a minimum
outside radius of forty (40) feet.
Page 75 of 113
19
2. Cul-de-sacs in commercial and industrial subdivisions shall terminate in a circular turnaround
having a minimum right-of-way of at least one hundred (100) feet in radius, and a paved
turnaround with a minimum radius of eighty (80) feet.
c. A dead-end street other than a cul-de-sac shall not be allowed except as a temporary stage of construction of a street
that will be extended in a later stage of construction. A temporary dead-end street shall be provided with a
temporary turn-around having a roadway radius of forty (40) feet if:
1. one or more lots front exclusively on the street; and,
2. extension of the street is not under construction when the Final Plat is submitted for recording.
3. Temporary turnarounds shall consist of three (3) inches of graded aggregate base course.
(9) Alleys and service drives.
a. Alleys may be required at the rear of all lots used for multi-family, commercial or industrial developments.
b. Alleys in residential subdivisions shall not be permitted, unless the alleys are intended to provide rear -access to
garages on each lot.
c. When allowed, dead-end alleys shall be provided with a turn-around having a radius of at least forty (40) feet, a “T-
head” turn-around, or other solution acceptable to the County Engineer.
Page 76 of 113
20
(10) Half streets prohibited.
Half streets are prohibited. Whenever a street is planned adjacent to the proposed subdivision tract boundary, the entire str eet
right-of-way shall be platted within the proposed subdivision.
(11) Split Level Streets and One-way Streets.
Streets which are constructed so as to have two trafficways, each at a different level within the same right -of-way, shall provide a
paved traffic surface of at least sixteen (16) feet on each level and a slope between the two trafficways o f not steeper than four to
one. One-way streets and split streets will be allowed when:
a. Topographic conditions are such that alternatives to the typical street construction would be more desirable.
b. The shape and size of the parcel could be more efficiently developed. In either case, approval must be obtained from
the Engineering Department for the specific design.
(12) Intersection islands.
Islands at intersections and the placement of signs within the right-of-way shall be subject to individual approval by the County
Engineer. The following criteria shall be met in the construction plans of such intersections:
a. Additional right-of-way must be provided to accommodate the divided intersection of island so as to meet all other
requirements of this ordinance.
b. No type of sign or other construction will be located within ten (10) feet horizontally from the road right -of-way of the
connecting road. In the event the connecting road has no right-of-way, an assumed right-of-way of twenty-five (25)
feet from the centerline shall be applied.
c. A concrete curb shall be constructed around the inside perimeter of the island. This curb shall be located four (4) feet
horizontally from any sign or structure on all sides.
d. The paved roadway on each side of the island shall have a usable paved width of not less than sixteen (16) feet.
e. The centerline of intersecting streets shall be a minimum of one hundred fifty (150) feet beyond the end of the entrance
island. No taper shall be allowed across the width of intersecting roadways.
f. No driveway curb cuts shall be allowed within five (5) feet of the end (rear) of the entrance island.
g. There shall be one hundred (100) feet of tangent roadway separating the entrance from a curve in the roadway.
h. The front of the island shall not encroach upon the intersecting right -of-way and shall not be more than ten (10) feet
from the same right-of-way.
i. Islands shall be properly underdrained.
j. Islands shall be maintained by the Commercial/Industrial subdivision owner or the subdivision’s Home Owners
Association.
k. Vegetation planted within islands shall not obscure motorists’ view between the heights of 2’ – 7’ above the pavement.
Plantings shall be approved by the County.
l. If the responsible parties for the maintenance of the islands are unresponsive to requests to remove dangerous trees
and limbs from islands, the County reserves the right to remove these trees or portion of trees at the owner’s expense
if necessary.
Page 77 of 113
21
Page 78 of 113
22
(13) Intersections and Driveway Grades
All streets and driveways shall provide a maximum grade of five (5) percent for a distance of twenty (20) feet from the edge of
pavement at any intersection (see figure 10.11)
Page 79 of 113
23
(Section Amended 4/1/2024)
10 (f) Street Improvements
Roadways shall be constructed and paved with asphalt/stone courses meeting the following standards:
(1) Minimum width of pavement.
a. The minimum pavement width, measured from edge of pavement to edge of pavement, shall be as required for the
street type as shown in Table 10.6 as well as in the design details.
(2) Street base.
a. Proof rolling will be witnessed by County inspector or certified by design engineer. Correct areas shown by the proof
rolling operation to be unstable or non-uniform. After correction of these deficient areas, repeat the proof rolling
operation.
b. Wherever unsuitable material is found in the subgrade, the unsuitable material shall be replaced with graded aggregate
stone.
c. Graded aggregate base course. The base course shall consist of mineral aggregate and may be a combination of
natural deposit or a blend of the materials specified. All materials are subject to approval by the County Engineer.
d. Street base material shall conform to the thickness as required for the street type in the Table 10.6 as well as in the
design details.
e. For streets without curbs, the base shall extend at least one half (0.5) foot beyond the edge of payment.
(3) Pavement surface course.
a. Prime. After the base has been placed, mixed, compacted, shaped, inspected and accepted, it shall be primed with
suitable asphaltic materials as specified by the County Engineer.
b. Roadway Intermediate Course. After the prime has been inspected and accepted, the roadway or street shall be
surfaced with Type B Intermediate Course as required for the street type on Table 10.6.
c. Tack coat shall be applied on a prepared road surface according to the requirements of the County Engineer and the
current standards of SCDOT.
Page 80 of 113
24
Table 10.6 Street Pavement Composition
Street Classification
Width of
Pavement Base Course
Intermediate
Course Surface Course
Residential Collector 24 ft. 6" GABC B 330 LBS/SY C 220 LBS/SY
Local Commercial or Industrial
Street 24 ft. 10" GABC B 440 LBS/SY C 220 LBS/SY
Local Residential Street 24 ft. 6" GABC B 220 LBS/SY C 220 LBS/SY
Alley 16 ft. 6" GABC B 220 LBS/SY C 155 LBS/SY
Roadway composition may be substituted by approved equivalent asphalt design structural number.
d. Final Surface Course shall consist of Type C asphalt pavement as required for the street type on Table 10.6.
e. If two-stage paving for residential streets is approved by the County Engineer, the developer shall place the binder
course on the street but may delay final paving. Prior to the expiration of the performance period, the binder surface
will be primed with suitable asphaltic materials [0.25 gallon of R.C. 70 per square yard] the same day it is compacted,
and cured for 7 days prior to paving. After the prime has been inspected and accepted, the roadway or street shall be
surfaced with a minimum 2 inches of Type C asphalt pavement wearing surface. No surface treatment pavement
as a finished wear surface will be accepted. All asphalt pavements will be mixed in an asphalt plant meeting the latest
requirements of the SCDOT.
f. Rolling and finishing
1. Rolling shall start at the edge and proceed toward the center, except on superelevated curves where rolling
shall proceed from the lower to the upper side and shall continue until the aggregates are firmly keyed or set.
On depressed widened areas not accessible for the operation of standard rollers, compaction shall be
performed by other approved rollers or methods.
2. If initial compaction has been performed and the voids have not been filled, fine aggregate shall be placed
upon the base in amount only sufficient to fill the voids. The base course shall be broomed, wetted and
rolled until the coarse aggregate is firmly set, bonded, and the base thoroughly compacted for the full width
and depth. During all phases of the work extreme care shall be taken to protect structures.
3. Finished roadbeds shall be crowned or elevated from the shoulder to centerline at a rate of 50:1 or 2% cross
slope. Superelevated curves or tying to intersections may require steeper cross slopes. Compaction shall
be to the satisfaction of the County Engineer.
Page 81 of 113
25
Figure 10.11A Roadway Typical Sections
(4) Curb and gutter.
a. Curb and gutter are required along:
1. All new commercial and industrial streets.
2. All new residential subdivision streets except for those subdivisions meeting the following
criteria:
a) Fewer than twenty-four (24) lots will be located in the subdivision on the new streets; or
b) The average size of all lots in the subdivision is greater than one (1) acre and the average lot width
is greater than one hundred fifty (150) feet.
3. Existing County streets and roads that abut a subdivision where curb and gutter are required, or abut a multi -
family or nonresidential development.
4. New construction on existing County streets and roads, including deceleration lanes and travel lane
widenings.
b. Local residential street curbs shall be, at a minimum, Portland cement concrete, 6 -inch x 18-inch x 10-inch vertical or
roll back type, with a minimum strength of 3,000 psi at twenty-eight (28) days
Page 82 of 113
26
Figure 10.11B Curb & Gutter Typical Sections
c. Curbs along collectors and local commercial or industrial street curbs shall be Portland cement concrete, 6 -inch x 24-
inch x 12-inch vertical type only, with a minimum strength of 3,000 psi at twenty-eight (28) days.
d. Curbing along streets shall meet the following standards:
1. Developer’s engineer or surveyor shall set line and grade.
2. One-half inch expansion joints of pre-molded bitumastic expansion joint material shall be provided at all
radius points and at intervals not to exceed 50 feet in the remainder of the curb and gutter.
3. The County Engineer shall individually approve special curbing design (center islands, etc.).
Page 83 of 113
27
4. Curb and gutter shall be set true to line and grade and finished by skilled workers to the section shown on
the plans.
5. Inferior workmanship or construction methods resulting in unsightly curb and gutter will be cause for rejection
of the finished work.
6. All curbing shall be backfilled and grassed.
7. Adequate storm drainage structures shall be provided. The curb and gutter shall be constructed so as to
present a smooth, even line both horizontally and vertically. There shall be no areas of ponding.
8. After installation, drainage under the curb to side slopes is required, using minimum 4 -inch diameter pipe
sections.
e. A valley gutter may be used across a driveway at its intersection with a street. However, valley gutters shall
not be allowed across streets at street intersections unless specifically approved by the County Engineer.
(5) Slopes and Shoulder Improvements.
a. On streets with curb and gutter, the shoulders shall slope 30:1 or 3.33% toward the roadway for at least eight (8)
feet from back of curb, and no steeper than 4:1 for the remainder of the right-of-way width.
b. On streets with swale ditch drainage, the shoulders shall slope 12.5:1 or 8% away from the roadway for at least
four (4) feet to the drainage channel. The maximum slope for the drainage channel shall be 4:1.
(6) Guardrails
Guardrails shall be installed as per SCDOT specifications. Any slope steeper than 4:1 with an embankment greater than six (6)
feet in height shall require a guardrail. Guardrail where necessary near intersections and driveways shall have adequate sight
distance for motorists looking over the guardrail. Guardrail may be necessary to protect existing structures, designe r should
refer to AASHTO clear zones for guidance.
10 (g) Substandard streets.
In the event that a proposed commercial development or residential development of five (5) homes or more has access to a
substandard road (i.e., a dirt or gravel road), the following project access improvements shall be required if deemed necessary
by the County Engineer:
(1) The substandard street shall be upgraded by the developer to a standard County road from the project entrance to
the nearest standard paved road along the route of access.
(2) The roadway section shall meet the requirements of a residential collector street. (3) The developer shall design the r oad
and provide the labor, equipment and materials required for roadway improvements and necessary drainage improvements.
(4) The right-of-way required for these off-site improvements shall be acquired by the developer at no expense to the County. If
the developer cannot acquire adequate right-of-way, the County Attorney shall initiate acquisition proceedings at the expense of
the developer after authorization by the County Council.
(5) If Pickens County desires the roadway to be improved to a standard greater than that for a residential collector street, the
County shall provide or pay the cost of the additional right-of-way, materials and labor.
10 (h) Street Abandonment.
Place Holder for Street Abandonment Procedures
Page 84 of 113
28
Sec. XI Private residential access.
Private residential access, if approved by the County, shall meet the following requirements and standards that apply to each ,
respective private access classification.
11 (a) Shared driveways.
(1) No more than three (3) lots may be served by a shared driveway.
(2) When three (3) lots are served by a shared driveway, the shared driveway must be named; said name shall be approved by
Pickens County E-911 staff.
(3) The shared driveway shall be located within an easement of at least twenty (20) feet in width.
(4) The maintenance of the shared driveway must be mutually agreed upon by the respective property owners and this
maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually
noted within the respective deeds.
(5) The following plat certification shall be placed upon every plat for every lot utilizing a shared driveway:
“The shared driveway and associated easement shown on this plat shall be a private access not owned, maintained, or
supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All
easements shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless
constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended.”
(6) There are no minimum construction standards for the shared driveway, with the exception of the driveway that encroaches
onto the County or State right-of-way for access to the public street.
Page 85 of 113
29
11 (b) Common drive.
(1) No more than ten (10) lots may have access to a common drive.
(2) All lots which gain access from a common drive shall be at least one (1) acre in size, exclusive of that portion of the lot which
is traversed by the required easement.
(3) The common drive shall be located within an easement of at least fifty (50) feet in width or within a designated right -of-way of
at least fifty (50) in width. If the common drive is located within a designated right -of-way, then that right-of-way shall be owned
and controlled by a homeowner’s association or other entity responsible of the drive’s maintenance.
(4) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the common drive.
(5) The common drive cannot originate from a shared driveway, another common drive or from a private road or be connected at
both ends to a public road.
(6) The maintenance of the common drive must be mutually agreed upon by the respective property owners and this
maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually
noted within the respective deeds.
(7) The following plat certification shall be placed upon every plat for every lot utilizing a common drive:
“The common drive and associated easement or right-of-way shown on this plat shall be a private access not owned,
maintained, or supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County.
All easements and rights-of-way shown upon the plat shall not be accepted for maintenance by Pickens County at any time in
the future unless constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as
amended.”
(8) Only those lots approved by the Planning Commission or by Planning Staff and platted with the common drive may utilize
said drive.
(9) The common drive must be named; said name shall be approved by Pickens County E -911 staff (when three (3) or more lots
are utilizing the common drive).
(10) The following, minimum construction standards shall apply. The standards must be certified as being met by a surveyor o r
engineer licensed in the State of South Carolina prior to plat approval.
a. Have a fourteen (14) foot driving surface with four (4) inch thick compacted stone base and height clearance
of thirteen and one-half (13.5) feet, and if a bridge is constructed as part of the private drive, a professional
engineer shall certify the weight which the bridge will support and a sign shall be conspicuously displayed on
each end of the bridge displaying the weight limits.
b. Be provided with an unpaved cul-de-sac having a radius of thirty (30) feet or ending in a (t) with two twenty-
five (25) foot extensions for vehicular turning movements.
c. Observe minimum road offsets for public roads. When an offset in alignment of a road occurs and where the
topography is suitable, a minimum distance between eighty (80) feet and one hundred and twenty -five (125)
feet shall separate opposing roads from centerline to centerline.
d. Observe the sight distance standards where the private drive intersects a public road to meet the
requirements of Table 10.5 Minimum Sight Distance. The sight distance shall be measured from a seeing
height of three and one-half feet to an object two feet in height above the grade of the public road. If the
proposed drive does not meet the sight distance requirement, a waiver must be signed by the individual(s)
constructing the private drive stating that the owner(s) is liable and responsible for any accidents, injuries,
problems, and property damage resulting from improper sight distance.
e. Meet the County’s and SCDES Storm Water Management and Erosion and Sediment Control Regulations.
11 (c) Shared Drive / Common Drive Hybrid.
(1) No more than five (5) lots or dwellings may be served by a shared driveway.
Page 86 of 113
30
(2) When three (3) lots are served by a shared driveway, the shared driveway must be named; said name shall be approved by
Pickens County E-911 staff.
(3) The shared driveway shall be located within an easement of at least thirty (30) feet in width. (Shared driveway easements
shall not be considered a part of a lot for the purpose of meeting the minimum requirements of this Development Standards
Ordinance.)
(4) The maintenance of the shared driveway must be mutually agreed upon by the respective property owners and this
maintenance agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually
noted within the respective deeds.
(5) The following plat certification shall be placed upon every plat for every lot utilizing a shared driveway:
“The shared driveway and associated easement shown on this plat shall be a private access not owned, maintained, or
supervised by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements
shown upon the plat shall not be considered for acceptance for maintenance by Pickens County.
(6) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the shared driveway.
(7) The shared driveway cannot originate from another shared driveway or be connected at both ends to a public road.
(8) The following minimum construction standards shall apply when a shared driveway serves more than 3 lots or dwellings. The
standards must be certified as being met by a surveyor or engineer licensed in the State of South Carolina prior to plat appr oval.
a. Have a fourteen (14) foot driving surface with four (4) inch thick compacted stone base and height clearance
of thirteen and one-half (13.5) feet, and if a bridge is constructed as part of the private drive, a professional
engineer shall certify the weight which the bridge will support and a sign shall be conspicuously displayed on
each end of the bridge displaying the weight limits.
b. Be provided with an unpaved cul-de-sac having a radius of thirty (30) feet or ending in a (t) with two twenty-
five (25) foot extensions for vehicular turning movements.
c. Meet the County’s and DES Storm Water Management and Erosion and Sediment Control Regulations.
d. Access onto a State road shall meet existing SC Department of Transportation requirements. Access onto a
County road must be approved by the Pickens County Roads and Bridges Department through an
encroachment permit.
e. Construction and design exceptions may be granted upon the joint approval of the County Engineer, the
Director of Emergency Services, and the Planning Department.
11 (d) Private Roads.
(1) The maximum number of lots which may be served by a private road shall be governed by Article 4 of this ordinance.
(2) The private road shall be located within a designated right-of-way of at least fifty (50) feet in width and that right-of-way shall
be owned and controlled by a homeowner’s association or other entity responsible for the road’s maintenance.
(3) All lots must meet minimum Development Ordinance requirements for minimum frontage onto the private road.
(4) Minimum lot size shall be governed by Article 4.
(5) The private road cannot originate from a shared driveway or from a common drive. The private road may originate and
connect to another private road provided that road meets the minimum requirements listed in this section.
(6) The maintenance of the private road must be mutually agreed upon by the respective property owners and this maintenance
agreement shall be outlined in an access agreement to be recorded with the Register of Deeds and individually noted within th e
respective deeds.
(7) The following plat certification shall be placed upon every plat for every lot utilizing a private road:
“The private road and associated right-of-way shown on this plat shall be a private access not owned, maintained, or supervised
by Pickens County and not constructed pursuant to any plan for future acceptance by Pickens County. All easements and rights -
Page 87 of 113
31
of-way shown upon the plat shall not be accepted for maintenance by Pickens County at any time in the future unless
constructed as a public road in accordance with The Pickens County Unified Development Ordinance, as amended.”
(8) All subdivisions utilizing private roads for access must be approved by the Planning Commission in accordance with the
procedures listed in Article 12.
(9) Only those lots approved by the Planning Commission and platted with the private road may utilize said road.
(10) The private road must be named; said name shall be approved by Pickens County E-911 staff.
(11) Construction standards.
The private road shall be constructed in accordance with the respective requirements for a public, local residential street.
Sec. XII Street signs, traffic signs and striping.
12 (a) Street name signs.
(1) Street name signs of a type approved by the County are to be placed at all intersections.
(2) Street markers shall be installed by the Developer at the Developer’s expense (or a homeowners association in the event an
alternate signpost is chosen at a later date).
(3) If nonstandard street signs are installed by the Developer/HOA, the Developer/HOA shall maintain the street signs.
12 (b) Traffic Signs.
(1) Traffic control signs shall conform to the U.S. Manual on Uniform Traffic Control Devices, latest edition.
(2) The Developer shall install these traffic control signs.
(3) Stop signs shall be located from the sign’s edge 6 feet off the back of curb or edge of pavement at the beginning of the
intersection radius. The sign shall be located on the right side of the intersection. The bottom of the sign shall be at leas t 7 feet
above the edge of pavement or back-of-curb. This standard applies to typical residential interior street intersections.
(4) All other intersections shall have stop signs located according to the Manual on Uniform Traffic Control Devices. The
Developer shall install these signs.
(5) Stop signs shall be sized so that their overall dimensions are 30 inches by 30 inches.
(6) All other signs shall be sized according to the Manual on Uniform Traffic Control Devices.
12 (c) Striping Requirements
(1) All newly constructed streets having four (4) or more lanes (including auxiliary lanes) and existing streets being widen ed with
one or more additional lanes shall be striped by the developer prior to approval and acceptance of the development by Pickens
County.
(2) Striping shall be accomplished with paint meeting SCDOT standards conforming to the Manual on Uniform Traffic Control
Devices.
(3) Final striping shall be thermoplastic.
(4) Yellow double center line markings should be placed on collector streets that have a traveled way of 18 feet or more in width
and an ADT of 3,000 vehicles per day or greater. White edge line markings should be placed on collector streets with a trave led
way of 20 feet or more in width and an ADT of 3,000 vehicles per day or greater. Yellow center line and white edge markings in
residential subdivisions are not necessary. Engineering judgement should be used if ADTs are not available.
Sec. XIII Street Lights
The installation of all street lighting fixtures within County right-of-way must be approved by the County Engineer prior to such
installation. All street lighting fixtures, including those within County right-of-way shall be maintained by the HOA.
Page 88 of 113
32
Sec. XIV Driveway and Development entrances.
All proposed subdivisions, subdivision lots and other land developments shall be provided with driveways or development
entrances meeting the following requirements:
14 (a) Encroachment Permit
An encroachment permit will be necessary for any new roadway, driveway, or drainage structure installed within the County rig ht
of way.
(1) Link to Encroachment Permit -
https://cms5.revize.com/revize/pickenscountysc/document_center/I%20WAnt%20To/Document%20&%20Forms/Roads%20
and%20Bridges/Encroachment%20Application%20Revised%201_25.pdf
(2) See Table 10.5 for sight distance requirements.
(3) The centerline of the proposed driveway or roadway must be staked and verified for adequate sight distance by County
representative. Final clearing of vegetation and trees will be necessary prior to field verification.
14 (b) Driveway access to a State road.
Access onto a State road shall meet existing SC Department of Transportation requirements. A copy of the SC Department of
Transportation permit shall be submitted to the County Engineer before the plans can be approved.
14 (c) Driveway access to major County roads.
(1) Residential lots in any major subdivision shall have no direct driveway access to a County major collector or arterial r oad
unless approved by the County Engineer, or to a State or U.S. numbered highway unless approved by the SCDOT, and
incorporated into the construction drawings for the project prior to issuance of a development permit by Pickens County.
(2) Reverse frontage lots may be utilized but are not required in major residential subdivisions where direct access to a Co unty
road, or to a State or U.S. numbered highway, is not allowed.
14 (d) Driveway standards; in general.
Each driveway shall be constructed in a manner that will not damage the adjacent roadway or hinder use of the adjacent
roadway.
(1) Driveways shall not intersect adjacent roads at an interior angle less than 60 degrees;
(2) All waters from driveways must enter onto the shoulders of adjacent roads and into the ditch or gutter. No water shall e nter
onto the adjacent road surface or pavement;
(3) Any driveway entering on a roadway or street shall provide a maximum grade of five (5) percent for a distance of twenty (20)
feet from the edge of pavement at any intersection.
(4) At the ditchline, the driveway must be lower in elevation than the adjacent roadbed;
(5) As far as practical, all driveways must be located and constructed so as to maximize sight distance by those traversing the
driveway or the adjacent road;
(6) In and around the first fifty (50) feet of all driveway culverts, the slope of the land shall be at a grade of no more t han 3:1 so
as to enable to County to better maintain the culvert area; and
(7) All driveway culvert pipes shall comply with the materials and installation requirements of this Article.
(8) On subdivided lots which access an existing County road, the driveway shall be placed as far as possible from existing r oad
intersections to maximize sight distance.
(9) Driveway spacing from adjacent driveways or intersections shall meet the minimum distances shown below.
Page 89 of 113
33
14 (e) Residential subdivision entrances.
(1) Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization,
etc., required as deemed necessary for safe traffic operations by the County Engineer shall be installed at all entrance road s into
a residential major subdivision. See Sec. 1016, below.
(2) A single entrance road to a subdivision shall serve no more than ninety -nine (99) lots. Where the property configuration
prohibits or makes impractical the installation of more than one entrance, the County Engineer may waive this requirement
following sound engineering practice. When more than one entrance is required, the first additional entrance shall be provide d to
serve up to an additional one hundred fifty (150) lots, and each additional entrance thereafter shall be provided for each
additional two-hundred fifty (250) lots.
(3) Residential major subdivisions with fewer than twenty-four (24) lots whose entrance is on an existing collector or arterial
road, and any major residential subdivision whose entrance is on an existing minor collector road, shall install offset radii and fifty
(50) foot tapers.
14 (f) Commercial/Industrial subdivision entrances.
Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization, etc.,
required as deemed necessary for safe traffic operations by the County Engineer shall be installed at all entrance roads into a
commercial/Industrial subdivision. See Sec. 1016, below.
14 (g) Driveways for multi-family and non-residential developments.
(1) Access improvements such as deceleration lanes, dedicated left-turning lanes, center turn lanes, merge lanes, signalization,
etc., required as deemed necessary for safe traffic operations by the County Engineer shall be installed at all entrance road s into
a multi-family or non-residential development.
(2) If a driveway entrance on a major collector or arterial street is less than two hundred (200) feet from an intersection, a
continuous travel lane shall be constructed from the intersecting street to the driveway, and an acceleration lane shall be
constructed beyond the driveway. Acceleration lanes shall extend for one hundred fifty (150) feet, with an additional fifty
(50) foot taper length, and have a pavement width of twelve (12) feet (exclusive of curb and gutter). Additional right -of-way
to accommodate the acceleration lane and a ten (10) foot shoulder shall be dedicated by the developer to Pickens County
(3) Commercial businesses on corner lots that have frontage on a local or minor collector side street shall install an addit ional
lane out to the intersection if driveway access from said side street is provided.
14 (h) Maintenance of sight distances.
The developer shall be required to upgrade the existing County road to meet the sight distance requirements of this Article. In
cases involving rock cuts, deep fills or cuts, proximity to floodplain, etc., the requirements of pavement widening for full
deceleration lanes may be modified or waived by the County Engineer following accepted engineering practice.
Sec. XV Deceleration lanes and turn lanes.
15 (a) Deceleration lanes; where required.
A deceleration lane shall be required at each entrance to a residential subdivision of 24 lots or more, commercial or industrial
subdivision, multifamily development or nonresidential development at its point of access with a collector or arterial street .
Page 90 of 113
34
15 (b) Median breaks.
If the street has an existing or proposed median, and the developer desires to construct a median break to serve the
development, a left turn lane leading to the median break shall be provided by the developer meeting the design standards of
Pickens County.
15 (c) Deceleration and turn lane constructions standards.
(1) Generally, deceleration lanes and turn lanes shall be a minimum length of one hundred fifty (150) feet, with an addition al fifty
(50) foot taper length, and a pavement width of twelve (12) feet (exclusive of curb and gutter). Additional right -of-way to
accommodate the deceleration lane or turn lane and a ten (10) foot shoulder shall be dedicated by the developer to Pickens
County. Deceleration lanes and tapers may be required to be of greater length, based on the design speed of the road.
(2) Curb and gutter along all deceleration lanes and tapers are required, and shall be constructed in accordance with 1010
(e)(3)f.
(3) Associated drainage improvements as deemed necessary by the construction of the deceleration or turn lane shall also be
required.
(4) Other project access improvements may be required by the County Engineer in addition to or in lieu of a required
deceleration lane in order to ensure adequate site access, pedestrian access, convenience and safety to the motoring public,
based on a traffic study prepared by a professional engineer.
(5) The developer will pay the cost of any catch basins that must be constructed along an existing County road as a result o f the
deceleration lane.
(6) Utilities and drain pipes shall be relocated at the developer’s expense outside of the deceleration lane. Waterlines can
remain beneath the additional lanes.
Sec. XVI Sidewalks.
16 (a) Sidewalks; where required.
(1) The Planning Commission, in consultation with the School District of Pickens County, shall determine the need for
sidewalks within subdivisions within one (1) mile of a school or for any subdivision with 10 or more homes on lots one (1) ac re or
less. If the determination is that a sidewalk is necessary, the subdivision developer shall be required to construct a concrete
sidewalk on both sides of all residential collector and residential local streets within the proposed development.
(2) The Planning Commission, in consultation with any adjacent municipality when a proposed development is located adjacent
to that municipality’s sidewalk network, shall determine the need for sidewalks within that development. If the determination is
that a sidewalk is necessary for circulation and access to public facilities or shopping opportunities, the subdivision devel oper
shall be required to construct a concrete sidewalk on both sides of all residential collector and residential local s treets within the
proposed development.
(3) Sidewalks are not required along any street that does not have curb and gutter.
(4) Sidewalks shall be maintained by the Developer/HOA.
16 (b) Sidewalks; where located.
(1) Sidewalks shall be located a minimum of two (2) feet from the back of curb, and a minimum of one (1) foot from the property
line to prevent interference of encroachment by fencing, walls, hedges or other planting or structures placed on the property line
at a later date.
(2) Sidewalks, when required, shall be located on one side of all residential collector and residential local streets within the
proposed development.
16 (c) Sidewalks; construction.
Page 91 of 113
35
(1) Sidewalks must comply with all requirements of the federal Americans with Disabilities Act.
(2) Concrete sidewalks shall be a minimum of five (5) feet wide and four (4) inches thick.
(3) Concrete shall be 3,000 psi at twenty-eight (28) days’ strength.
(4) Sidewalks shall be backfilled and landscaped.
16 (d) Crosswalks.
Crosswalks shall be installed at stop-controlled intersections having sidewalks. Thermoplastic striping eight inches wide shall
designate the six feet wide crosswalk. The stop bar shall be placed a minimum of 4’ from the crosswalk.
Sec. XVII Location of utilities and curb cuts.
All utility work, encroachments, pavement cuts and associated road or lane closures must be reviewed, approved and permitted
by the County Engineer.
Page 92 of 113
36
17 (a) Location of utilities in streets.
(1) Above-ground utilities.
Street light poles, junction boxes, transformers and other public or private utility structures placed above ground within a street
right-of-way must be at least eight (8) feet back from the back of the street curb (or edge of pavement) and one (1) foot back
from the edge of any sidewalk, whichever is farthermost from the roadway.
(2) Underground Utilities.
a. Utilities placed underground shall be placed within the right-of-way as shown on the Standard Details.
b. The right-of-way is to be cleared and rough graded the full width prior to any utility installation.
c. Cable and pipe shall be three (3) foot below finished grade minimum.
d. Any disturbance or construction in the completed (seeded and/or sodded) right -of-way by a public utility such
as power, water, sewer, gas, phone and cable must be repaired and/or replaced with the specified materials
as called for in the initial improvements.
e. All utilities beneath pavement shall be installed and the ditch backfilled and thoroughly compacted before any
pavement or base is installed, or the pipes shall be bored if installed after street construction. If pavement
cuts are necessary to repair utilities, asphalt repairs shall match the existing roadway pavement section.
f. All utility manholes and valve boxes shall be brought to the finished grade within the roadway section.
g. All private utilities that will cross under pavement shall be installed completely throughout the subdivision
prior to any roadway base being applied. Approved utility sleeves shall be installed if utility installations are
not completed prior to roadway base construction.
h. All utilities shall parallel the roadway and be placed in the shoulders excluding where crossings are
necessary. Utilities crossing under the roadway, excluding lateral, shall be perpendicular to the roadway and
sleeved.
i. Utility plans shall be approved by the County Engineer.
(3) Underground utility location with open ditch.
a. Maximum drainage swale slopes (front and back) are 5:1 and a minimum of 4:1 with the invert of the swale
no less than twenty-four (24) inches from the finished elevation of the street.
b. Utilities shall have a minimum 24”cover from the invert of the ditch and the bottom of culverts.
(4) Underground utility location with curb and gutter. Cross drains are to be carried to the toe of construction slope.
Sec. XVIII Storm drainage.
Stormwater facilities shall be governed by the Pickens County Stormwater Ordinance and accompanying Stormwater Design
Manual. Where discrepancies exist between this development ordinance and the adopted Pickens County Stormwater
Ordinance and accompanying Stormwater Design Manual, the Stormwater Ordinance shall control.
18 (a) Applicability and exemptions.
(1) An adequate drainage system, including necessary ditches, pipes, culverts, drains, inlets, bridges, etc., shall be provi ded for
the proper drainage of all surface water.
(2) All persons proposing development or construction in the County shall prepare a stormwater management plan. No final
subdivision plat shall be approved and no development or building permit shall be issued until and unless the stormwater
management plan has been reviewed and approved by the County Stormwater Manager and the County Engineer as guided by
the Pickens County Storm Water Ordinance and accompanying Storm Water Manual.
(3) Exemptions from Storm Drainage Requirements.
Page 93 of 113
37
Consultation should be made with the Pickens County Stormwater Manager to determine any applicable exemptions from these
requirements.
(4) Any revisions to the stormwater management plan shall be submitted to the County Engineer for review and approval.
18 (b) Standards to be used in designing system:
(1) Storm detention facilities:
All stormwater detention facilities shall be provided for and designed according to the adopted Stormwater Ordinance and
accompanying Stormwater Design Manual.
(2) Location of stormwater detention facilities.
a. In residential subdivisions, the detention facility must be located on a separate lot and owned by a
homeowners’ association, which shall be responsible for its maintenance and continuing operation. The lot
need not meet minimum lot size requirements for the subdivision.
b. In nonresidential subdivisions, the detention facility may be located on a separate lot and owned by a
property owners’ association, which shall be responsible for its maintenance and continuing operation; or
located on each lot within the subdivision and constructed when the lot is developed.
c. In multi-family and nonresidential development projects, separate detention facilities shall be provided for
each development. The owner of the property shall be responsible for maintenance and continuing operation
of the facility.
d. Stormwater detention facilities serving two or more developments may be approved by the County,
provided that private ownership of the facilities and provisions for their perpetual maintenance and continuing
operation are clearly established in a manner acceptable to the County Attorney.
e. Where fences are required to be provided by the County Engineer, they shall be constructed between 3.5
and 6 feet high.
1. Commercial gauge chain link fence shall be screened with acceptable hedge material or a
climbing vine.
2. If a wood fence is desired it shall be placed on the lots of the individual property owners and be
noted as their maintenance responsibility (i.e., shown on the plats and deeds at dedication).
(3) Storm Drains.
a. Crossline pipes shall be designed to carry a 25 year – 24-hour storm and shall be RCP Class III concrete.
The design shall be determined using runoff data sources and standard methods approved by the County
Engineer. However, no culvert less than eighteen (18) inches in diameter will be acceptable.
b. Concrete culverts must conform to South Carolina Highway Department requirements. Hancor double wall
plastic pipe or an approved equivalent shall be accepted where sufficient fill over the pipe is provided. No
metal pipes shall be accepted.
c. All parallel culverts and driveway culverts shall be designed to carry a 10 year – 24 hour storm event.
Driveway culverts shall be a minimum of fifteen (15) inches in diameter.
d. Where possible, all pipe shall be laid in a trench. Trenches shall be excavated to the required grade and to a
width sufficient to allow for proper installation and back fill around the pipe. The backfill method used shall
be different for rigid (concrete) and for flexible (corrugated) pipe and shall be as specified by the
manufacturer. All culverts shall have a minimum of ten (10) inches fill above the top of the culvert, excluding
pavement and/or base of pavement. Flexible pipe shall have a minimum of two feet of fill over the pipe. All
fill shall be compacted to 98% of standard proctor test in the top foot of fill.
e. The jointing of sections of culvert shall be done in a workmanlike manner in accordance with the standard
practice recommended by the manufacturer of the culvert being used.
Page 94 of 113
38
f. The ends of all pipe culverts shall be properly protected to prevent piping, erosion and scour. Placement of
filter fabric and rip-rap shall be considered minimum treatment. End treatments shall be approved by the
County Engineer and shown on the plans.
g. All crossline drainage culverts shall be located in natural drainage areas or depressions. All crossline
culverts will terminate at a dedicated drainage easement. Drainage easements shall be a minimum of twenty
(20) feet wide.
h. All existing culverts within the County right-of-way impacted by proposed developments shall be upgraded as
necessary to accommodate proposed flows.
i. Junction boxes of an approved type will be constructed at all points where the line of pipe changes course or
direction ten (10) degrees or more and at proper intervals along the line of pipe.
j. A means of access to inlet and outlet points of drainage structures and appurtenances must be provided and
shown on the plans. Pickens County will not be responsible for damage to property outside of drainage
easements caused by floods.
k. Exits for surface water in sideline ditches or curbs shall be provided in accordance with the following
schedule:
l. All storm water drainage features such as swales, ditches and pipes shall be constructed to an approved
discharge point or to the property line of the development. All storm water features shall be in place and
properly stabilized to prevent erosion of the constructed swale or ditch. Velocities within grass stabilized
ditches or swales shall be held to non-erosive flow rates. Storm water flow rate calculations shall be based
upon proposed ground cover conditions and the Manning Equation and submitted to the County Engineer
before approval of the construction plans is given.
(4) Bridges
In the event that it becomes necessary to install a bridge rather than a pipe culvert, then such bridge and installation shal l
conform to current South Carolina Department of Transportation requirements. Bridges shall provide 2 feet of freeboard to the
low chord, above the 25-year storm event. Detailed bridge designs and calculations must be submitted to the County Engineer
for separate approval. The necessity for a bridge and its design criteria shall be determined on an individual basis.
Sec. XIX Public water system.
(1) Public water service shall be provided to every lot in every subdivision and to every development for both domestic use and
fire protection if public water is available. Water mains shall be connected to the existing public water system and extende d past
each lot. All water system improvements shall meet the standards for public water service of the providing jurisdiction. For the
purposes of this section, available shall mean an adequate water supply to serve both domestic use and fire pr otection (flows of
550 gallons per minute minimum) located adjacent to or within close proximity to the property being developed.
Page 95 of 113
39
(2) Mains shall be at least 6 inches in diameter.
(3) If a public water system is not available nor under bid or contract to be available, the sub divider shall provide a wat er supply
using a community water system or individual wells in conformity with the regulations of DHEC, these development regulations,
and all other applicable laws and regulations. If a community water system is created, it must be designed to provide a minim um
fire flow of 550 gallons per minute.
Sec. XX Public sewerage system.
(1) Every lot in every subdivision and every development shall be connected to septic tanks or other on -site disposal systems in
accordance with the regulations of DHEC, these development regulations and all other applicable laws and regulations.
(2) If a community septic system is created, it must be approved by the Pickens County Public Service Commission (or other
providing jurisdiction when applicable).
(3) If a subdivision or other development is requesting from Pickens County the ability to tie onto a public sewage conveyan ce
and treatment system, then all system improvements and construction shall meet the standards for public sewer service of the
providing jurisdiction.
Page 96 of 113
40
BLANK PAGE
Page 97 of 113
AGENDA ITEM: 2b
PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION
Meeting Date: October 20, 2025
Agenda Item: 2b
Department: Environmental Enforcement
Prepared By: Allison Fowler
Subject:
Third Reading of an ordinance for amendments to Pickens County Code of Ordinances related to unsafe
property conditions and further consolidate said amended ordinances for more efficient reference and
enforcement and matters related thereto.
Summary:
Third reading of ordinance amendments related to Property Conditions
Documents Included:
Draft Ordinance for 3
rd Reading
Action Requested:
Approval
Staff Recommendation:
Approval
Previous Council Action (if any):
2
nd Reading (9/15/25)
1st Reading (9/2/25)
Additional Notes:
Page 98 of 113
Section 8-44. Maintenance.
a) All buildings, portions of buildings and accessory structur es governed under this article shall be maintained in a
safe and sanitary manner, with all fixtures, devices or sa feguards which are required by this article to be in good
working order. The owner, or occupier, if so outlined in a lease agreement or under or der due to the enforcement
of this article, shall be responsible for its maintenance, repair and alteration.
b) Every tenant shall dispose of the gar bage he generates by placing it in su ch garbage disposal facility or garbage
storage containers as is provided by hi s landlord. It shall be unlawful for a person to leave garbage or waste on
the premises he occupied as a tenant or to otherwise do damage to or cr eate an unsanitary or unsafe condition
when he departs by completion of or breach of any lease. Any person found guilty of violating this article shall be
deemed to have committed a misdemeanor and shall be punished as provided in section 1-7 .
c) Trash in Yards.
No person shall permit household trash, litter or solid waste wh ich is not in a litter receptacle or is left exposed to
the elements and visible from any public road or adjoini ng property to remain on the property for a period in
excess of thirty (30) days.
Properties that are deemed Agricultural by the Pickens County Assessor’s Office are hereby exempt from 8-44c
above.
Page 99 of 113
Sec. 10-73. - Definitions.
As used in this article, the following terms shall have the meanings given below:
Commercial junk shall mean items for resale or more than five junked vehicles stored on a tract of land.
Fence shall mean a substantial, continuous barrier aesthetica lly constructed and extending fr om the surface of the ground
to a uniform height of not less than six feet. The finished side of the fence sha ll face the public and be constructed of
treated lumber, stockade, masonry, chai n link or other approved material. F abric fences shall be not allowed.
Junk shall mean old or scrap copper, brass, rope, rags, batteries, paper, trash, rubber debris, or tires, waste, junked,
dismantled or wrecked motor vehicles or parts thereof, iron, steel and other old or scrap ferr ous or nonferrous metal. The
term junk shall include, but not be limited to, abandoned barre ls or drums, dismantled or inoperable industrial or
commercial equipment, machinery being salvaged for parts, appliances , motors, industrial or comme rcial fixtures, or parts
thereof.
Junked or abandoned vehicle shall mean any vehicle without a current and valid license plate which is not moved or
subject to physical repair or restoration for a period in e xcess of 90 days. An inoperable wrecked vehicle with a current
license plate shall also be considered a junked vehicle.
Junkyard shall mean any location, including a residential area, est ablishment, or place of business that is maintained,
operated, or used for storing junk. The term shall not include county operated or approved and permitted sanitary landfills.
Yard sales of 48 hours' duration or less shall be ex empt from the provisi ons of this article.
Local street shall mean a minor local street is one designed primar ily to access abutting properties. This street normally
terminates in a cul-de-sac, loop or other tu rnaround, with no more than two access points.
Lot of record shall mean a lot or parcel of land, the plat or deed of which has been recorded prior to the adoption of this
article.
Major local street shall mean a major local street is one designed primar ily to access abutting pr operties. This street is
characterized as one having two or more access points, and receiving traffic from minor local streets.
Nonconforming shall mean signs, structures, uses of land and characteri stics of uses that are prohibited under the terms of
this article, but were lawful on the date of the article's enactment.
Nonresidential use shall mean a principal use of land for other than residential purposes, i.e. commercial, industrial,
institutional.
Public building shall mean any building owned, leased or held by the Un ited States, the state, the county or any city, any
special purpose district, or any other agency or political subdivi sion of the state or the United States, which building is use d
for governmental or other public purpose.
Re-inspection fee shall mean the fee assessed when a property fails t he initial inspection and must be re-inspected at a
later date.
Right-of-way (ROW) shall denote the limits of public road property. On county roads when there is no deeded right-of-way
along a road or highway, the right-of-way shall be consi dered to be 25 feet from t he centerline on each side.
Scenic highway/scenic byway shall mean a road or highway under federal, st ate or county jurisdiction that has been so
designated through legislation ordinance other official declarati on because of its scenic, historic, recreational, cultural,
Page 100 of 113
archeological, or natural qualities. An official declaration is an action taken by an individual, board, committee, or politica l
subdivision acting with the granted authority on behal f of the federal, stat e or county government.
Setback shall refer to the required distance between a structur e or building line and the nearest property line or right-of-
way.
Temporary storage shall be defined as not exceeding 90 days, subject to state law, from the date possession or custody of
the vehicle is obtained except when po ssession is pursuant to a court order.
Vegetation shall mean the following recommended shrubs/trees for hedge planting with planting distance, in feet, between
plants and from fence:
Plants must be a minimum height of three feet when planted and reach a height at maturity of not less than eight feet.
Wrecker, towing and impoundment service shall mean an establishment or place of business that provides towing or
temporary storage services for currently licensed and curr ently registered vehicles that have been wrecked or
repossessed, or whose possession is by virtue of court order, a c opy of which is in the possession of the proprietor of such
service or affixed to the vehicle.
Shrubs—Five feet apart Trees—Seven feet apart
Red Tip Photinia Eastern Red Cedar
Wax Leaf Liqustrum Leyland Cypress
Burford Holly Virginia Pine
Nellie R. Stevens Holly Southern Magnolia
Carolina Cherry White Pine
Wax Myrtle Hemlock
American Holly
Page 101 of 113
AGENDA ITEM: 3a
PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION
Meeting Date: October 20, 2025
Agenda Item: 3a
Department: Technology
Prepared By: Allison Fowler
Subject:
Funding request for replacement and repair of the inoperable portion of the Detention Center Camera System.
Summary:
Over the past several years, the Detention Center has experienced the loss of multiple security cameras due to
various factors, including storm damage, water intrusion and inherent design flaws. As a result, 17 cameras within
the facility are currently non-operational or comprised. The attached quote is intended to cover the full replacement
of all 17 affected cameras to restore complete surveillance coverage, ensure safety and security of st aff and
inmates, and maintain compliance with operational and legal standards.
Documents Included:
Project Quote
Action Requested:
Approval
Staff Recommendation:
Approval
Previous Council Action (if any):
N/A
Additional Notes:
Page 102 of 113
Pickens County Council
South Carolina
Jail Cameras
Encore Technology Group
202 Wall St., Piedmont, SC 29673
(888) 983-6267 • www.encoretg.com
Page 103 of 113
⎥ Page 1
Contents
Statement of Work .................................................................................................................................................... 2
Overview ................................................................................................................................................................ 2
Project Scope ......................................................................................................................................................... 2
Project Deliverables ............................................................................................................................................... 3
Out of Scope ........................................................................................................................................................... 4
CLIENT Responsibilities .......................................................................................................................................... 4
General Assumptions ............................................................................................................................................. 4
Warranty Allowances ............................................................................................................................................. 5
Financial Investment .................................................................................................................................................. 6
Cost Summary ........................................................................................................................................................ 6
Payment Terms ...................................................................................................................................................... 6
Terms and Conditions ............................................................................................................................................ 6
Indemnification ...................................................................................................................................................... 6
No Changes Without Encore’s Written Authorization ........................................................................................... 6
Notice to CLIENT .................................................................................................................................................... 7
Acceptance ............................................................................................................................................................. 7
Quote ......................................................................................................................................................................... 8
Page 104 of 113
⎥ Page 2
Statement of Work
Overview
Pickens County Council ( CLIENT) is planning the replacement of existing Pelco video surveillance cameras and
Paxton Net2 controllers that were damaged during a recent storm event. All affected cameras will be replaced
with the most current direct replacement models available. Paxton controllers will be replaced with exact models.
Encore Technology Group ( Encore) is pleased to present the following Scope of Work outlining the labor and
materials required to complete this replacement effort.
It is understood that the existing cameras are connected to a central security management system for the
detention center. Encore did not install this system and will not have administrative access to make changes within
it. Encore’s responsibility is limi ted to the physical replacement of the damaged cameras and the assignment of
the same IP addressing information currently in place on the existing units.
The Client will be responsible for confirming connectivity and functionality of the newly installed cameras within
the central security management system, and for performing any configuration or adjustments required to
maintain ongoing operations.
Paxton controllers will require a client provided IP address and configurations will be performed by Encore
technicians.
Project Scope
Encore shall be responsible for:
Project Planning Phase:
• Project Kickoff Call - A pre-project planning meeting will be held to:
o Ensure CLIENT and Encore agree to scope as defined
o Identify key stakeholders and points of contact
o Create tentative project schedule
o Establish communication plan
• Project Plan – creation of detailed plan to include:
o Establishing project timeline
o Scheduling of required resources
o Scheduling of project status call day and time
Implementation
• Encore Project Manager shall:
o Conduct regular status update meetings and distribute project status report
o Ensure Encore resources adhere to defined scope
o Serve as escalation point for CLIENT Project Manager
o Notify CLIENT Project Manager if delays within CLIENT owned scope effort are witnessed
o Obtain written signoffs from CLIENT for all main project phases
o Maintain project plan
• Encore Physical Security Team shall perform the following tasks as they pertain to each portion of the
project:
o Physically remove (18) existing damaged cameras and replace with new units
IP address information will be provided by the client and applied to the new cameras by
Encore technicians
All other configurations are assumed to be performed by the client or a 3
rd party
integrator
Page 105 of 113
⎥ Page 3
Location Camera Mounting Existing Model New Model
Sallyport AD114 Surface Mount IMP221-1ES SRXP4-2V10-EMD
Sallyport IP125 Surface Mount IMP221-1ES SRXP4-2V10-EMD
CM97 REC G106 Surface Mount IMP221-1ES SRXP4-2V10-EMD
Corridor IP123 (#1) Surface Mount IMP221-1ES SRXP4-2V10-EMD
Corridor IP123 (#2) Surface Mount IMP221-1ES SRXP4-2V10-EMD
Dayroom K102 Surface Mount IMP221-1ES SRXP4-2V10-EMD
Vehicle Sallyport Exit Surface Mount IMP221-1ES SRXP4-2V10-EMD
Pedestal Sallyport Entry 305 Surface Mount IMP221-1ES SRXP4-2V10-EMD
Conference AD106 Surface Mount IMP221-1ES SRXP4-2V10-EMD
Sallyport Entry-1 External Corner Mount IMM12036 SMLE1-12V5-4H
Vehicle Sallyport Exit-1 Surface Mount IMM12036 SMLE1-12V5-4H
Booking Area 120 Surface Mount IMM12036 SMLE1-12V5-4H
Vehicle Sallyport Entry-1 Surface Mount IMM12036 SMLE1-12V5-4H
Outside Rec Yard G Surface Mount IMM12036 SMLE1-12V5-4H
Corridor AD105-1 Surface Mount IMM12036 SMLE1-12V5-4H
Sallyport IP101 Surface Mount IMM12036 SMLE1-12V5-4H
Booking Area Surface Mount IMM12036 SMLE1-12V5-4H
Swing Hold IP105 Surface : Inside Corner IBD329-1 IBD332-1
Notes: All camera locations are assumed to be accessible by 12ft ladder or smaller. If a powered lift is needed, the
client will provide a bucket truck for Encore’s use. All camera mounting locations were not observed and mounting
hardware is estimated on best guess. Some additional components may be needed for proper mounting.
o Physically remove and replace (4) damaged Paxton controllers
Gate Controller
Video Visit Admin Controller
Nurses Office Controller
Main Lobby Controller
o Configure the replaced controllers to the original settings
Will require assistance from the client to ensure access to the system is available
Post Implementation
• Encore Project Manager shall:
o Conduct close out meeting
o Obtain final project sign off
o Provide CLIENT with a copy of all final documentation – based Project Deliverables as defined
below
• Encore On-site Team shall:
o Perform a final walkthrough of the jobsite to:
Clean-up and remove install equipment and waste
Verify all product and hardware is accounted for and installed
Project Deliverables
• Product specification and warranty information will be provided upon request
Page 106 of 113
⎥ Page 4
Out of Scope
• Any changes required post scope of work acceptance will result in a project change order and may result
in additional billing. A copy of the Change Request Form is attached in Appendix B.
• Work performed outside Encore standard work hours of Monday through Friday 8am to 5pm
• Any delays resulting from waiting on CLIENT or Client’s 3rd party vendors
• Any conduit pathways
• Any concrete core drilling
• Any low voltage permits needed are not reflected in the quoted amount and if needed will result in a
Change order for the acquired cost
• Any powered lift equipment unless otherwise stated in the Implementation
• Any connection of patch cabling from new or existing patch panels to the network switch equipment
unless otherwise stated in the Implementation
• Anything not listed above as in scope shall be considered out of scope
CLIENT Responsibilities
• CLIENT will provide:
o full and timely administrative access, including remote access, to all physical and logical
components required for project during Encore’s normal business hours of 8am-5pm EST Monday
- Friday
o all necessary hardware, software, licensing, etc. unless defined differently in an attached Bill of
Materials
o an onsite resource to facilitate all information and communication per project requirements
o availability for downtime, if required
o for a secure area to store and deploy product from, at each site
o any powered lift equipment required for the installation of any equipment involved in the project
o all existing camera IP address information
o any configurations outside the IP addressing and physical mounting of new cameras
• CLIENT will coordinate:
o with Encore Project Manager to sign-off on project plan / design prior to implementation
o with the primary contact at each site to ensure access to all affected area as well as a schedule a
start time and cutover period, prior to start of the project
General Assumptions
• Work may be performed remotely or onsite at Encore’s discretion
• Any deviation from the equipment quantities listed in the implementation or attached bill of materials is
outside the provided scope of work and will require a change order
• All cabling needs are assumed to be in place and readily accessible with no obstructions which would
prevent the install of new cameras
• No additional fire penetrations or fire sleeves will be required for the installation of cabling
• Overall pricing assumes that crews will be scheduled to provide focused effort on the project in full, 40 -
hour work week segments
• Any delays not caused by Encore requiring the unscheduled withdrawal of Encore resources may
necessitate a change order
• All equipment and cabling locations are accessible via 12ft standard A-frame ladder or smaller and do not
require the use of a powered lift
• If a powered lift is required for the installation of any portion of the project, one shall be provided by the
Client or by Encore in the form of a Change Order
• An executed Project Completion Sign-off form (Appendix A) will be required to indicate project completion
Page 107 of 113
⎥ Page 5
Warranty Allowances
• Acceptance/Sign-off: Upon project completion, ENCORE will seek to obtain formal sign -off from CLIENT
that the installation of all products were successfully completed as outlined within this contract. If Encore
is unable to obtain sign-off from CLIENT after 30 days from the project completion date, it will be assumed
that verification that all components has been completed, and product has been installed and operate
correctly as stated within this contract
• Installation Warranty: For a period of one (1) year after the Completion Date, Encore shall warranty the
quality of the installation and workmanship. If there are any issues identified/experienced within a year
from the completion date with the product that was installed, and it is determined that the issue is due
to an improper or incomplete installation, Encore shall repair/replace at no cost to CLIENT at Encore’s
discretion
• Product Warranty: All Product Warranties are solely based upon the manufacturer’s warranty, which
does not reflect Encore’s associated labor cost to install and configure the product. If a part fails within
the manufacturers specified warranty period and it was installed correctly by Encore, Encore will work
with the manufacturer on CLIENT’s behalf to leverage the warranty and arrange a replacement product
item at no cost to CLIENT. However, CLIENT may be responsible for labor cost to replace the product.
Page 108 of 113
⎥ Page 6
Financial Investment
This project is being sold on a fixed cost basis and includes both on -site, and off -site planning, testing, and
deployment time. Components of this project may be performed off-site.
Cost Summary
The following table provides a summary of the price for the hardware, software, and services to complete this
project. A cost schedule detailing the specific hardware, software, and services is attached.
Description Price
Please see attached quote for products and services.
Total**
*taxes are estimated and may differ from actual invoice.
**Also see attached quote.
If a change in scope develops, an immediate review will be conducted between Pickens County Council and Encore
Technology Group to determine further action.
Payment Terms
This project will be billed as follows:
1. Product will be billed when ordered by Encore with payment due within 30 days of the invoice date.
2. Services will be progress billed periodically with payment due within 30 days of the invoice date.
Terms and Conditions
All sales are exclusively subject to and conditioned upon the terms and conditions of sale posted at
http://www.encoretg.com/terms-and-conditions, and any other additional or different terms are objected to and
rejected unless Encore expressly agrees to them in a signed writing.
Indemnification
Purchaser agrees to indemnify, defend, and hold Encore harmless from and against any and all third-party claims,
demands, actions, losses, liabilities, costs and expenses (including reasonable attorneys’ fees and court costs)
arising from or resulting from or in connection with this Agreement.
No Changes Without Encore’s Written Authorization
Encore objects to and rejects any handwritten or other changes to this Agreement made by CLIENT unless such
changes are initialed by Encore and the Agreement is countersigned by Encore with knowledge of the changes.
Page 109 of 113
⎥ Page 7
Notice to CLIENT
THE TERMS AND CONDITIONS OF THIS AGREEMENT ARE STATED ON THE PREVIOUS PAGES AND IN THE
FOLLOWING APPENDICES. BY SIGNING THIS AGREEMENT, YOU ACKNOWLEDGE THAT YOU HAVE READ,
UNDERSTAND, AND AGREE TO BE BOUND BY THIS AGREEMENT. FURTHER, YOU AGREE THAT THIS IS THE
COMPLETE STATEMENT OF THE AGREEMENT BETWEEN YOU AND ENCORE WHICH SUPERSEDES ALL OTHERS, ORAL
OR WRITTEN, RELATING TO THE SUBJECT MATTER OF THIS AGREEMENT.
Acceptance
By signing below, both Encore and the Client acknowledge that they have read and understood the information
disclosed in this document, and agree to the terms herein.
E
ncore Technology Group, LLC. Pickens County Council
202 Wall St. 222 McDaniel Avenue
Piedmont, SC 29673 Pickens, SC 29671
Encore Authorized Signature CLIENT Authorized Signature
Printed Name Printed Name
Title Title
Date Date
Page 110 of 113
1024811
Version: 1
Encore Technology Group, LLC
202 Wall Street
Piedmont, SC 29673
(888) 983-6267
www.encoretg.com
Jail Cameras
Prepared For
Pickens County Council
Robert Furr
222 McDaniel Avenue
Pickens, SC 29671
rfurr@pickenscountysc.gov
(864) 898-5874
Prepared By
John Dockery
Phone: 864-979-4984
Email: jdockery@encoretg.com
Camera Replacements Price Qty Extended
SRXP4-2V10-
EMD
2MP Sarix Pro 4 Environmental Dome, 3.4-10.5mm P-iris lens,
Surface Mount, True WDR, SureVision, Pelco Smart Analytics
$404.02 9 $3,636.18
SMLE1-12V5-4H 12 Megapixel Network Outdoor 180º - 360º Camera with 3.3-5.7mm
Lens
$1,408.49 8 $11,267.92
IBD332-1 3 Megapixel Indoor/Outdoor IR Corner Camera with 2.3mm Lens $808.04 1 $808.04
IMD1-PMT Outdoor pendant mount adapter $130.75 2 $261.50
IMD1-SPLD1 Clear Lower Dome f/SARIX MPro-Surf Mnt $130.75 7 $915.25
IMD1-SMT Surface mount adapter f/Sarix Multi cam $130.75 6 $784.50
IMD1-IR IR illuminator ring for Sarix Multi cam $289.01 2 $578.02
WLMT-1001 Wall Arm Adapter $98.57 2 $197.14
MISC Miscellaneous Hardware for Installation $500.00 1 $500.00
Labor - Fixed Encore Engineering Services $6,292.50 1 $6,292.50
Camera Replacements Subtotal $25,241.05
Paxton Replacements Price Qty Extended
GA-682630US NET2 PLUS IN ENCL W/POE PSU $618.14 4 $2,472.56
Labor - Fixed Encore Engineering Services $1,150.00 1 $1,150.00
Paxton Replacements Subtotal $3,622.56
Recap Amount
Camera Replacements $25,241.05
Paxton Replacements $3,622.56
Subtotal $28,863.61
Tax $1,499.49
Total $30,363.10
Encore Technology Group, LLC Page 1 of 2 October 01, 2025
Page 111 of 113
1024811
Version: 1
Encore Technology Group, LLC
202 Wall Street
Piedmont, SC 29673
(888) 983-6267
www.encoretg.com
Jail Cameras
Based on the rapidly changing market, availability, lead times, and potential tariffs are all possibilities. Please note that pricing and
availability are subject to change. Encore will notify client of any changes in availability, pricing, or fees (tariffs, surcharges, shipping, etc.) as we are made
aware.
Currently, some manufacturers are requiring non-cancellation clauses on purchase orders. For those orders, Encore may also require a non-cancellation
clause to be signed before an order can be processed.
All sales are exclusively subject to and conditioned upon the terms and conditions of sale posted at http://www.encoretg.com/terms-and-conditions, and any
other additional or different terms are objected to and rejected unless Encore expressly agrees to them in a signed writing.
Signature Date
Encore Technology Group, LLC Page 2 of 2 October 01, 2025
Page 112 of 113
AGENDA ITEM: 3b
PICKENS COUNTY COUNCIL MEETING SUPPORTING DOCUMENTATION
Meeting Date: October 20, 2025
Agenda Item: 3b
Department: Administration
Prepared By: Allison Fowler
Subject:
Presentation and discussion on a Comprehensive Litter Strategy
Summary:
Update on Pickens Proud, a Comprehensive Litter Strategy first developed in 2021
Documents Included:
N/A
Action Requested:
N/A
Staff Recommendation:
N/A
Previous Council Action (if any):
N/A
Additional Notes:
Page 113 of 113
Source: Pickens County website. First collected Oct 23, 2026.