Planning Commission Meeting — Agenda Packet
Pickens County · Pickens County · Planning Commission · meeting of Oct 13, 2025 · Agenda packets
Open the original document More from Pickens County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
October 2025
Changes to the RV
Parks and
Campground
Standards
Sec. 302 Recreational Vehicle (RV) Parks and Campgrounds.
302 (a) Purpose.
The purpose of this section is to provide opportunities for quality developed campgrounds and
recreational vehicle parks that are properly sited where there is adequate public street access and
adequate access to other public services which may be needed b y such endeavor. In order to create a
desirable and successful recreation environment while protecting the public health, safety, and welfare,
Planning Commission review and consideration will be required; unless exempted in the following
sections. Two or more RVs on one single parcel constitutes an RV Park.
302 (b) Use Standards.
(1) Each park or campground must have direct frontage and access to a collector or arterial street.
Access to each individual site and other provided structures shall be from internal /private roads.
Individual sites shall not be accessed directly from a public road.
1a. Roadways within an RV Park or Campground shall be constructed to all -weather standards:
graded road of equivalent materials that is passable by vehicles under both wet and dry weather
conditions.
1b. All roadways shall have a minimum travel width of twelve feet (12’) for single lane travel and
twenty-four feet (24’) for two lane travel, and a thirty-five foot (35’) turning radius required on all
curves to allow access by emergency vehicles.
(2) RV parks and campgrounds must be a minimum of five (5) -acres in size and shall not exceed ten
(10)-acres in the Appalachian, Agricultural, and Natural Heritage Areas and must be a minimum of
five (5)-acres in the Community Center and Gateway Areas.
(3) No site shall be used as a permanent residence and shall only be for the use of travel trailers, pickup
campers, coaches, motor homes, camping trailers, other vehicular accommodations, tents, park
model units, and on-site rental cabins. No site may be used for more than one hundred eighty (180)
days in any calendar year by the same occupant.
(4) Overall density of the park or campground shall be limited to no more than four (4) sites per acre.
(5) Minimum Space Size. A minimum net space of 690 square feet is required for each RV space.
(6) Setbacks. RV parks and campgrounds shall maintain a minimum setback of 100 feet from all property
lines.
(7) Sites may be served by on -site sewage disposal system as permitted by SCDHEC; however, each
individual site may not be served with an individual system.
(8) For sites within the RV park and campground that are not otherwise served with sewage disposal
connections, an onsite bath house (provisions for restroom and bathing facilities) must be provided.
(9) Sites shall not be served by individually metered power or water service. When multiple sites are
being provided, master meter(s) must provide service to the entire RV park and campground. All
sites must have access to public water, either directly or communally.
(10) For RV parks and campgrounds with more than four (4) sites a storm shelter shall be provided per
IRC standards.
(11) At the time of application for land use approval, RV parks and campgrounds must include a proper
site management plan to be instituted once operational.
(12) 911 Addressing is required for all RV parks and campgrounds.
(13) Buffers. RV parks and campgrounds are subject to a Class II Buffer (see Figure 8.2, Section 812)
(14) Minimum Separation Between Recreational Vehicles.
1. A distance of a least 10 feet shall be maintained between recreational vehicles.
2. For the purpose of this requirement, accessory structures and accessories attached to an
RV are considered a part of the recreational vehicle.
Defining Solar Farm,
Commercial Lodging,
and Campground
Article 16: Glossary of Defined Terms
Article 16. Glossary of Defined Terms
Table of Contents page
Sec. 1601 Purpose of Article 16........................................................................................................ ......16-1
Sec. 1602 Interpretation............................................................................................................... ...........16-1
Sec. 1603 Definitions...............................................................................................................................16-1
Pickens County UDSO: Amended 2/6/10; 4/1/24
Article 16: Glossary of Defined Terms
BLANK PAGE
Pickens County UDSO: Amended 2/6/10; 4/1/24
Article 16: Glossary of Defined Terms
Article 16. Glossary of Defined Terms
Sec. 1601 Purpose of Article 16.
This Article is a glossary of all definitions specifically used in the text of this Unified Development Standards Ordinance.
Sec. 1602 Interpretation.
1) Words and phrases defined in this Development Ordinance shall be interpreted as defined without regard to other
meanings in common or ordinary use, unless the context of the word or phrase indicates otherwise.
2) While definitions are located throughout this Development Ordinance in the Articles to which they most readily refer, all
definitions are presented in this Glossary in alphabetical order as a convenience. However, if differences in wording occur
between definitions of a term in another Article of this Code and in this Glossary, the definition contained within the other
Article shall control.
3) Refer to the Adoption, Applicability and Interpretation Article of this Development Ordinance regarding the use and
meaning of words and phrases.
Sec. 1603 Definitions.
Abandoned Signs: Signs that are in a state of disrepair and dilapidation or signs for which the business or activity to which they refer no
longer exists.
Access: A way or means of approach to provide physical entrance to a property.
Accessory Structure Setback Line: A line delineating the minimum allowable distance between a property line or the right -of-way line of an
abutting street, and an accessory structure.
Accessory Use or Structure (building): A use or structure that is permitted on a property in conjunction with a principal use. An accessory
use is incidental to the principal use and would not exist independent of the principal use.
Addition (to an existing building): Any walled and roofed expansion to the perimeter of a building in which the addition is connected by a
common load-bearing wall other than a firewall. Any walled and roofed addition which is connected by a firewall or is separated by
independent perimeter, load-bearing walls is new construction.
Adult Arcade: Any place to which the public is permitted or invited wherein coin operated, slug -operated or electronically, or mechanically -
controlled still or motion picture machines, projectors or other image -producing devices are maintained to show images to one or more
persons per machine at any one time, and where the images so displayed are distinguished or characterized by the depicting or describing of
“specified sexual activities” or “specified anatomical areas.”
Adult Bookstore (Adult Retail Store, Adult Video Store): a commercial establishment which excludes any person by virtue of age from all
or part of the premises generally held open to the public where products or equipment distinguishe d or characterized by a predominant
emphasis or simulation of “specified sexual activities” or “specified anatomical areas” are sold, rented, or displayed therei n, (unless the
business complies with the requirements of 2C herein) or, which has as one of its principal business purposes, the sale or rental for any form,
for consideration, one or more of the following:
a. Books, magazines, periodicals or other printed matter, or photographs, films, motion picture, video cassettes or video
reproductions, slides, or other visual representations which depict or describe “specified sexual activities” or “specified
anatomical areas.
b. Instruments, devices, paraphernalia, or clothing that are designed for use in connection with “specified sexual
activities,” excluding condoms and other birth control and disease prevention products. A commercial establishment may
have other principal business purposes that do not involve the offering for sale or rental of material depicting or describing
“specified sexual activities” or “specified anatomical areas” and still be categorized as an adult bookstore or
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-1
Article 16: Glossary of Defined Terms
adult video store so long as one of its principal business purposes is the offering for sale or rental, the specified
materials which describe “specified sexual activities or “specified anatomical areas.”
c. “Adult bookstore,” “Adult retail store” or Adult video store” does not mean any establishment which displays, rents or sells
sexually-explicit materials in an enclosed room equal to less than 10% of the business’s total square footage, and which
prohibits anyone under 18 years of age from entering the room.
d. “Principle business purpose,” as used in this section, means that more than twenty -five percent (25%) of the “stock in
trade” of the business is devoted to the display, rent or sale of items, products or equipment distinguished or
characterized by a predominant emphasis on, or simulation of, “specified sexual activities” or “specified anatomical
areas.”
e. “ Stock in Trade” for purposes of this sub-section shall mean the greater of:
1. The retail dollar value of all items, products or equipment readily available for purpose, rental, viewing or use
by patrons of the establishment, excluding material located in any storeroom or other portion of the premises
not regularly open to patrons; or
2. The total volume of shelf space and display area.
Adult Cabaret: a nightclub, bar, restaurant or similar commercial eating drinking establishment, which regularly features:
a. Persons who appear in a state of nudity.
b. Live performances which are characterized by the exposure of “specified anatomical areas” or by “specified sexual activities. ”
c. Films, motion pictures, video cassettes, slides or other photographic reproductions which are characterized by the depiction or
description of “specified anatomical areas.”
Adult Carwash: a car wash where some or all of the employees are semi-nude or nude and/or where “specified sexual activities” or
“specified anatomical areas” are exhibited.
Adult Motel: A hotel, motel or similar commercial establishment which:
a. offers accommodations to the public for any form of consideration; provides patrons with closed circuit television
transmissions, films, motion pictures, video cassettes, slides or other photographic reproductions which are
characterized by the depiction or description of “specified sexual activities” or “specified anatomical areas,” and which may
have a sign visible from the public right-of-way which advertises the availability of this type of photographic
reproductions, or
b. Routinely offers a sleeping room for rent for a period of time that is less than eight hours, or
c. Routinely allows a tenant or occupant of a sleeping room to sub-rent the room for a period of time that is less than
eight hours, or
d. Evidence that a sleeping room in hotel, motel, or a similar commercial establishment has been rented and vacated two
or more times in a period of time that is less than eight hours creates a rebuttable presumption that the establishment is
an adult motel as that term is defined in this section.
Adult Motion Picture Theater: a commercial motion picture theater, one of whose primary business purpose is, for any form of
consideration, to regularly show films, motion picture, video cassettes, slides or similar photographic reproductions which a re characterized
by the depiction or description of “specified sexual activities” or “specified anatomical areas.”
Adult Theater: a commercial theater, concert hall, auditorium, or similar commercial establishment, one of whose primary business
purpose is to regularly features persons who appear I a state of nudity, or which features live performances which are characterized by the
exposure of “specified anatomical areas” or by “specified sexual activities.”
Agricultural Activities: 1. good-faith commercial production from the land or on the land of agricultural products, including horticultural,
floricultural, dairy, livestock, poultry, and apiarian products, but not including forestry products (see “Tree harvesting” below); and 2.
clearing trees for the purpose of planting crops, providing pasture for livestock, or constructing buildings accessory to production of
agricultural products.
Airport: The Pickens County Airport.
Airport Elevation: The established elevation of the highest point in the usable landing area, which is 1013 feet above mean sea level.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-2
Article 16: Glossary of Defined Terms
Airport Hazard: Any overhead power line, not constructed, operated and maintained according to standard engineering practices in general
use which interferes with radio communication or navigation between a publicly owned airport and aircraft approaching or leav ing same, or
any approaching or leaving same, or any structure or tree or use of land which obstructs the airspace required for the landin g or takeoff of
aircraft or impairs the utility of the airport.
Airport Reference Point: The point established as the approximate geographic center of the airport landing area and so designated.
Antenna: Any device or combination of devices, whether rods, panels or dishes, designed to receive and/or transmit radio frequency
signals for amateur radio or personal wireless services, including but not limited to cellular telephone, Personal Communicat ions Services
(PCS), Specialized Mobile Radio (SMR), Enhanced Specialized Mobile Radio (ESMR), Private Mobile Radio (PMR) and paging.
Appeal: a request for a review of the local administrator's interpretation of any provision of this ordinance.
Approach Surface: A surface longitudinally centered on the extended runway center- line, extending outward and upward from the end of the
primary surface and at the same slope as the approach zone height limitation slope set forth in Section 9.2 of this Ordinance . The perimeter
of the approach surface coincides with the perimeter of the approach zone.
Applicant: A property owner or their authorized representative who has petitioned the County for approval of a land use permit,
development permit, building permit, hardship variance, or appeal, or any other authorization for the use or development of t heir property
under the requirements of this Development Standards Ordinance.
Application: A petition for approval of a land use permit, development permit, building permit, hardship variance, or appeal, or any other
authorization for the use or development of a property under the requirements of this Development Standards Ordinance.
Area of shallow flooding: A designated AO or VO Zone on a community's Flood Insurance Rate Map (FIRM) with base flood depths of one to
three feet where a clearly defined channel does not exist, where the path of flooding is unpredictable and indeterminate, and where velocity
flow may be evident.
Area of Special Flood Hazard: The land in the flood plain within a community subject to a 1 percent or greater chance of flooding in any
given year.
As-Built Survey Drawings: Drawings specifying the dimensions, location, capacities, and operational capabilities of structures and facilities
as they have been constructed.
Automatic Changeable Copy Sign: A sign or portion thereof on which the copy or symbols change automatically through electrical means
(for example, time and temperature units).
Awning: A roof-like cover that projects from the wall of a building for the purpose of shielding a doorway, or window from the elements.
Awnings are often made of fabric or flexible plastic supported by a rigid frame, and may be retracted into the face of the bu ilding.
Awning sign: See “Building Sign.”
Backstop: A device constructed to stop, redirect, and or contain bullets fired on a range.
Banner: A sign other than an official or personal flag, made of paper, cloth, thin plastic, or similar lightweight material, and usually
containing a message or logo.
Base flood: The flood having a one percent chance of being equaled or exceeded in any given year.
Basement: Any enclosed area of a building that is below grade on all sides.
Berm: A mound of earth, or the act of pushing earth into a mound. An embankment used for restricting bullets to a certain area, or as a
protective or dividing wall between ranges.
Billboard sign: Any permanent sign, excluding Off-Premises Directional Signs as defined hereinafter, with advertising copy not related to
the use of the property on which the structure is located.
Buffer: An area of natural vegetation or man-made construction, which is intended to provide a visual and dimensional separation between
dissimilar land uses.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-3
Article 16: Glossary of Defined Terms
1) Natural Buffer: A visual screen created by vegetation of such density so as to present an opaque visual separation when viewe d
from one side to the other throughout the year.
2) Structural Buffer: A visual screen created through construction of a solid wooden fence, decorative masonry wall, earthen ber m,
or combination of fence or wall with an earthen berm, which may be supplemented with vegetation, so as to present an opaque
visual separation when viewed from one side to the other throughout the year.
Buildable Area of Lot: That portion of a lot bounded by and interior to the required rear, side and front building setback lines for a principal
building.
Building: Any structure having a roof supported by columns or walls and intended for the shelter, housing, or enclosure of any individu al,
animal, process, equipment, goods, or materials of any kind.
Building Code: The technical codes approved for enforcement or otherwise adopted or adopted as amended by the General Assembly of
the State of South Carolina.
Building Floor Area: The gross floor area of all heated spaces within a building. Heated floor area does not include garages, unheated
basements, attic storage areas and partially unenclosed decks, patios or lanais. Gross floor area comprises the area within the inside
perimeter of the exterior walls with no deduction for corridors, stairs, closets, thickness of walls, columns or other features, exclusive of areas
open and unobstructed to the sky.
Building Height: The vertical distance measured to the highest point of a building from the average finished grade across those sides of a
building that face a street.
Building sign: A sign that in any manner is fastened to, projects from, or is placed or painted upon the exterior wall, window, door, or roo f of
a building. The term “building sign” includes but is not limited to the following:
1) Awning sign: A sign imposed, mounted or painted upon an awning.
2) Marquee sign: Any sign attached flat against the marquee or permanent sidewalk canopy of a building and not extending above
the top of the marquee.
3) Projecting sign: A sign affixed to a wall and extending more than 8 inches from the surface of such wall, usually perpendicul ar to
the wall surface.
4) Roof sign: A sign that is mounted on, applied to, or otherwise structurally supported by the roof of a building.
5) Wall (or façade) sign: A sign that is fastened directly to or is placed or painted directly upon the exterior wall of a build ing, with
the sign face parallel to the wall, and extending from the surface of the wall no more than 8 inches.
6) Window sign: A sign that is placed on or behind a windowpane or glass door and intended to be viewed from outside the
building.
Caliper: The diameter of a proposed tree (usually nursery stock) measured at a point 6 inches above the ground or top of root ball for up to
and including 4-inch caliper trees, and at a point 12 inches above the ground or top of root ball for larger sizes.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-4
Article 16: Glossary of Defined Terms
Campground: a parcel or tract of land, or multiple contiguous parcels, where two (2) or more sites are provided for the temporary occupan cy of
tents, recreational vehicles (RVs), travel trailers, park model RVs, cabins, or other similar camping units. The primary purp ose of a campground
is to offer temporary outdoor living and accommodations for recreational, religious, educational, or vacation purposes, for c ompensation.
The term "Campground" shall include all associated services, facilities, roads, utility hookups, accessory structures, and ot her amenities provided
for the use of the occupants.
This term does not include:
1. The use of a residential property for camping by the property owner or their non -paying guests.
2. A mobile home park or other development regulated for the purpose of permanent residential occupancy.
3. A recreational vehicle parked or stored on a single lot, when not part of a multi -site commercial establishment.
Canopy: A permanent roof -like structure projecting from a building and open on at least one side for the purpose of shielding a pedestrian
walkway from the elements, or a freestanding roof-like structure supported by columns intended to shield a vehicular driveway or service area
from the elements.
Canopy Trees: A deciduous tree that forms the top layer of vegetation in a forest. Examples of such trees include oak, hickory, maple,
poplar, and others.
Certificate of Nonconformity: A certificate issued by the Pickens County Planning Department to any sexually oriented business which is
operating at the time of the enactment of this Chapter, and is not in compliance with one or more of its provisions.
Channel, Stream or River: The bed where a natural stream of water runs.
Church: an establishment, other than a private dwelling, where religious services are usually conducted.
Cliff: Very steep, vertical, or overhanging face of rock, earth, or ice.
Common Drive: A privately owned and maintained right-of-way or easement that is constructed to the standards set forth in Section
1012(b) and provides vehicular access and road frontage to no more than ten (10) lots or building sites.
Common Open Space: See “Open Space.”
Comprehensive Plan: The Comprehensive Plan for the County, prepared, adopted and as amended from time to time in accordance with the
South Carolina Local Government Comprehensive Planning Enabling Act of 1994, which serves as a roadmap for the growth and
development of the County in the future.
Commercial: Pertains to activities performed or engaged in for the primary purpose of gain or profit.
Communication Tower (AKA Cell Tower, Telecommunication Tower): Any structure designed and constructed primarily for the support of one
or more antennae and including guyed, self-support (lattice) and monopole types. This term does not include Concealed Support
Structures.
Concealed Support Structure: Any freestanding structure constructed for the primary purpose of supporting one or more antennae but
designed to resemble an architectural or natural feature of the specific environment, concealing or camouflaging the presence of the
antennae. The term includes but is not limited to clock towers, campaniles, water towers, silos, light poles, flagpoles, and artificial trees.
Condition of Land Use Permit Approval: A requirement adopted by the Planning Commission at the time of approval of a land use permit,
placing greater or additional requirements or restrictions on the property than provided in this Development Standards Ordina nce in order to
reduce an adverse impact of the land use and to further the protection of the public health, s afety, or general welfare.
Condominiums: A condominium is an ownership arrangement, not a land use. It is individual ownership of a unit in a multi -unit structure.
Constructive Right-of-Way: When there is no deeded ROW along a road or highway, the right of way shall be assumed to be that area
bounded by a set of lines parallel to the centerline and 25 feet from the centerline on each side.
Corner Lot: Any lot bounded by two (2) streets at their intersection.
Cove: A deep recess or small valley in the side of a mountain.
Creek: A natural stream of water normally smaller than and often a tributary to a river.
Cul-de-sac: A "local street" having one end open to traffic and the other end permanently terminated with a paved turnaround.
Cul-de-sac turnaround: A paved area terminating a cul-de-sac street, provided for the purpose of enabling vehicles to reverse direction while
driving continuously in a forward but circular manner. For the purpose of this definition, the turnaround shall be considered to begin at that point
where the street right-of-way begins, and continues, to widen in order to create the turnaround.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-5
Article 16: Glossary of Defined Terms
Dancer: An employee of a sexually oriented business who entertains patrons through expressive forms of dance and/or movement.
dBA: The sound pressure level, in decibels, as measured using the “A” weighted scale and impulse response mode on a sound level
meter.
Dedication: The transfer of property interests from private to public ownership for a public purpose. The transfer may be of fee-simple
interest or of a less than fee interest, including an easement.
Density, Gross: The quotient of the total number of dwelling units, lots, or building sites divided by the total area of a site.
Developer: The person, corporation or other legal entity that undertakes the subdivision of property, the alteration of land or vegetati on in
preparation for construction activity, or the construction of streets, utilities, buildings or other improvements required fo r the habitation or use
of property.
Development: (1) A land development project involving the construction of streets, utilities, buildings, or other improvements required fo r the
habitation or use of property, such as a residential neighborhood, an apartment complex, a store, or a shopping center; (2) any
manmade change to improved or unimproved real estate, including, but not limited to, buildings or other structures, mining, dredging,
filling, grading, paving, excavating, drilling operations, or permanent storage of materials; (3) the act of constructing or carrying out a land
development project, including the alteration of land or vegetation in preparation for construction activity.
Development Permit: The authorization necessary to initiate and conduct a land- disturbing activity and to carry out the planned
development of land and structures.
Development Site: That portion of a tract of land that will be dedicated to a proposed development, including the land containing trees that
will be counted toward satisfying the requirements of these provisions.
Development Standards: Land use protection controls which specify a minimum requirement or maximum limit on the effects of land use rather
than, or in addition to, specifying the use itself, simultaneously assuring compatibility with surrounding development and increasing a developer’s
or property owner’s flexibility.
Dock Station: A dock station is that portion of a dock structure that is entirely on land, positioned above the full-pool lake level, that
provides a pathway and anchoring point to the portion of the dock that floats or otherwise extends into the water. The dock station does not exist
independent of the dock and may serve only those docks that are permitted or licensed by the permitting or licensing authorit y of the lake.
The dock station is intended to primarily facilitate the movement of people to and from the dock with other activities genera lly not allowed. As
with the accompanying walkway, the dock station should be designed to preserve t he natural buffer and constructed with a porous surface
that inhibits storm water runoff.
Double-faced sign: A sign structure with two sign faces that are parallel (back-to-back) or that form an angle to one another, where each sign
face is designed to be seen from a different direction and the two sign faces are separated from each other at their nearest point by no more
than three feet.
Double-Frontage Lot (i.e., a through lot): A lot bounding on two (2) or more streets, but not at their intersection, so that it is not a corner lot
unless said corner lot has frontage on three (3) or more sides.
Drainage Structure: A device composed of a virtually nonerodable material such as concrete, steel, plastic or other such material that
conveys water from one place to another by intercepting the flow and carrying it to a release point for storm -water management, drainage
control or flood control purposes.
Drip Line: A perimeter formed by the points farthest away from the trunk of a tree where precipitation falling from the branches of that tree
lands on the ground.
Duplex: A two-family dwelling (see under “Dwelling, Single-Family Attached: Duplex”).
Dwelling: A building or portion of a building arranged or designed to provide living quarters for one or more families on a permanent, long-
term basis.
1) Single-Family Detached Residence: A residential building, whether site-built or a manufactured home or an industrialized
building, designed for occupancy by one family.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-6
Article 16: Glossary of Defined Terms
2) Single-Family Attached: Duplex: A residential building designed exclusively for occupancy by two families in separate dwelling
units living independently of each other.
3) Single-Family Attached Townhome: A townhome is defined as an attached, privately owned single-family dwelling unit which is
on its own parcel of land and is one consistent unit from the ground to the sky and is a part of and adjacent to either two o r more
other single-family dwelling units that are connected to but separated from one another by a common party wall having no doors,
windows, or other provisions for human passage or visibility.
4) Multi-Family: A residential building designed exclusively for occupancy by three or more families in separate dwelling units living
independently of each other, such as in a garden apartment building.
Dwelling Unit: One or more rooms connected together and constituting a separate, independent housekeeping establishment with
complete provisions for cooking, eating, sleeping, bathing and personal hygiene, and physically set apart from any other dwel ling unit in the
same structure; for use of one family.
Elevated Building: A non-basement building built to have the lowest floor of the lowest elevated area elevated above the ground level by
means of fill; solid foundation perimeter walls; pilings, columns, posts and piers, shear walls; or breakaway walls.
Employee: an individual working and performing services for any sexually oriented business, including any independent contractor who
provides services on behalf of any sexually oriented business to the patrons of such business.
Erosion: The process by which land surface is worn away by the action of wind, water, ice, or gravity.
Erosion and Sedimentation Control Plan: A plan for the control of soil erosion and sedimentation resulting from a land -disturbing activity.
Established or establishment: Includes any of the following:
a. The opening or commencement of any sexually oriented business as a new business.
b. The conversion of an existing business, whether or not a sexually oriented business, to a sexually oriented business.
c. The addition of any sexually oriented business to any other existing sexually oriented business.
d. The relocation of any sexually oriented business.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-7
Article 16: Glossary of Defined Terms
Evergreen Tree: A coniferous tree that remains green throughout the year.
Existing Construction: For the purposes of flood damage prevention requirements, means, for the purposes of determining rates, structures for
which the start of construction commenced before the effective date of the FIRM, or before January 1, 1975, for FIRMs effecti ve before that
date.
Family: An individual or two or more persons living together as a household.
Fence: An artificially constructed barrier of wood, wire, wire mesh, or decorative metal erected to enclose, screen or separate port ions of a
lot.
Fill: A portion of land surface to which soil or other solid material has been added; the depth above the original ground.
Filling: The placement of any soil or other solid material, either organic or inorganic, on a natural ground surface or excavation.
Finished Grade: The final elevation and contour of the ground after cutting or filling and conforming to the proposed design.
Firearm: A weapon, including but not limited to pistols or handguns, rifles, and shot- guns capable of firing a projectile using an explosive
charge as a propellant.
Firing line: A line parallel to the targets from where firearms are discharged.
Firing position/shooting station: An area directly behind the firing line having a specified width and depth that is occupied by a shooter,
his/her equipment, and, if applicable, an instructor or coach.
Flag Lots: A tract of land or lot with a developable area connected to a road by a narrow strip of land, referred to as the pole that in cludes
the driveway. It is a method used to develop otherwise landlocked areas.
Flood or Flooding: A general and temporary condition of partial or complete inundation of normally dry land areas from the:
1) Overflow of inland or tidal waters; or
2) Unusual and rapid accumulation or runoff of surface waters from any source.
Flood Hazard Boundary Map (FHBM): An official map of a community, issued by the Federal Emergency Management Agency, where the
boundaries of the areas of special flood hazard have been defined as Zone A.
Flood Insurance Rate Map (FIRM): An official map of a community, on which the Federal Emergency Management Agency has delineated
both the areas of special flood hazard or the risk premium zones applicable to the community.
Flood Insurance Study: The official report provided by the Federal Emergency Management Agency . The report contains flood profiles, as
well as the Flood Boundary Floodway Map and the water surface elevation of the base flood.
Flood Plain: Any land area susceptible to flooding.
Floodway: The channel of a river or other watercourse and the adjacent land areas that must be reserved in order to discharge the base
flood without cumulatively increasing the water surface elevation more than one foot.
Floor: The top surface of an enclosed area in a building, including basement, i.e., top of slab in concrete slab construction or top of wood
flooring in wood frame construction. The term does not include the floor of a garage used solely for parking vehicles or stor age, or the floor
area of an attic used exclusively for storage.
Floor Area, Building: See “Building Floor Area.”
Floor Area, Gross: See “Gross Floor Area.”
Frontage or Street Frontage: The width in linear feet of a lot where it abuts the right- of-way of any street from which access may be
directly gained.
Grading: Altering the shape of ground surfaces to a predetermined condition; this includes stripping, cutting, filling, stockpiling an d shaping,
or any combination thereof, and shall include the land in its cut or filled condition.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-8
Article 16: Glossary of Defined Terms
Greenway: Linear green belts linking residential areas with other open space.
Gross Floor Area: The total area of all floors of a building, measured from the outside planes of the exterior walls.
Ground Cover: A low growing plant, other than turf grass, which forms a continuous cover over the ground surface.
Ground Elevation: The original elevation of the ground surface prior to cutting or filling.
Guest House: An accessory use to a dwelling designed and intended for the temporary housing of visitors to a property at the behest of the
property residents for no fee or other consideration, and meeting or exceeding the Standards for Single -Family and Two -Family Dwellings
under this ordinance.
Health Club: a health club where some or all of the employees are nude or semi -nude, or in which “specified sexual activities” occur or
“specified anatomical areas” are exhibited.
Height: The distance measured from grade to the highest point of any and all components of the structure, including antennae, hazard
lighting, and other appurtenances, if any.
Highest Adjacent Grade: The highest natural elevation of the ground surface, prior to construction, next to the proposed foundation of a
building.
Historic Structure: any structure that is: (a) listed individually in the National Register of Historic Places (a listing maintained by the U.S.
Department of the Interior (DOI)) or preliminarily determined by the Secretary of the Interior as meeting the requirements for individual
listing on the National Register; (b) certified or preliminarily determined by the Secretary of the Interior as contributing to the historical
significance of a registered historic district or a district preliminarily determined by the Secretary to qualify as a regist ered historic district; (c)
individually listed on a State inventory of historic places; (d) individually listed on a local inventory of historic places in communities with historic
preservation programs that have been certified (1) by an approved State program as determined by the Secretary of Interior, or (2) directly by
the Secretary of Interior in states without approved programs. Some structures or districts listed on the State or local
inventories MAY NOT be "Historic" as cited above, but have been included on the inventories because it was believed that the structures or
districts have the potential for meeting the "Historic" structure criteria of the DOI. In order for these structures to meet NFIP historic structure
criteria, it must be demonstrated and evidenced that the South Carolina Department of Archives and History has individually determined
that the structure or district meets DOI historic structure criteria.
Home Occupation: Any occupation within a dwelling, and clearly incidental thereto, carried on by a member of the family residing on the
premises, provided that:
a. No exterior indication of the use is evident other than a sign permitted by these regulations;
b. The maximum floor area used for such occupation shall not exceed six hundred (600) square feet or twenty-five
percent (25%) of the gross floor area; and
c. Employees shall not exceed one (1), other than the occupant employee.
Commercial Lodging Establishment: A commercial use that provides temporary sleeping accommodations for compensation.
This term includes, but is not limited to, hotels, motels, resorts, inns, bed and breakfasts, and similar establishments.
This term does not include:
1. Residential dwellings used as a permanent residence.
2. Hospitals, nursing homes, assisted living facilities, or similar medical or care -focused institutions.
3. Dormitories, fraternities, or sororities associated with a school or university.
Household: An individual living alone or a group of individuals living together in a single dwelling unit, sharing common use of and acc ess to
all living and eating areas, bathrooms, and food preparation areas, who mutually combine their efforts and share responsibilities for
domestic chores such as child rearing, cleaning and cooking in a permanent and long -term relationship, as contrasted to one in a transient
relationship who pays for lodging such as a boarder.
Impermeable: Something (such as a layer of rock) that water cannot pass through or be absorbed by.
Impervious Surface: A man-made structure or surface that prevents the infiltration of storm water into the ground below the structure or
surface, such as a building, paved road or driveway, parking lot, deck, swimming pool or patio.
Industrial Uses, Heavy : Uses that have severe potential for negative impact on any uses which would locate relatively close to them. This
group differs from light industrial uses in that it includes uses that require unenclosed structures that are large, tall, an d unsightly, such as
concrete batching plants. These uses also have severe potential for generation of odor and may involve large amounts of exter ior storage,
because of their scale; they are unlikely to have regional impact. These uses include landing strips and heliports, asphalt or concrete
mixing plants, bulk material or machinery storage (unenclosed), fuel generation plants, grain elevators, meat packing plants or slaughter
houses, resource recovery facilities, motor or rail terminals, land fill and industrial waste disposal facilities; also, any industrial use,
including those uses listed below as light industry, having two-hundred thousand (200,000) or more square feet of floor area or more than five-
hundred (500) employees on any shift, and all other heavy industrial uses.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-9
Article 16: Glossary of Defined Terms
Industrial Uses, Light: Light Uses that are generally not objectionable because of noise, heavy truck traffic, or fumes, or generate
nuisances, which may be ameliorated adequately by performance standards. These uses include boat works, building material sales or storage
yards, bulk materials or machinery storage, carpet and rug cleaning plants, contractors' offices and equipment storage yards, dry cleaning
and laundry plants, dyeing plants, extermination shops, food processing and packing plants, fuel oil, ice, coal, and wood sal es, furniture
cleaning plants, furniture refinishing shops, lumberyards, manufacturing, including production, processing cleaning, testing, and distribution of
materials, goods, foodstuffs, and products in plants with less than two -hundred thousand (200,000) square feet of floor area, or fewer than
five-hundred (500) employees on every shift, mini-warehouses or storage facilities, mirror supply and refinishing shops, monument works,
ornamental iron workshops, pilot plants, printing plants, publishing plants, scientific laboratories, trade shops, truck terminal, veterinary
offices and kennels, warehouses, wholesale business and storage, and all other similarly light industrial uses.
Institutional Uses: Uses that are supportive of the residential community. They provide indoor space for recreation, hobbies, meetings,
education, and worship, as well as cultural facilities, group quarters for religious groups and the infirm or elderly, and bo arding houses. While
some uses may be operated for private profit, they duplicate services that are generally provided by public or non-profit groups. These
uses include rooming houses, day or youth camps, cemeteries, churches, community or recreational centers, convents, day care centers,
group dwellings, gymnasiums, halfway houses, libraries or museums, nursing homes, indoor recreational centers, public or priv ate schools,
schools or homes for persons with physical or mental disabilities, in- door skating rinks, indoor swimming pools, tennis, racquetball,
handball courts, and all other institutional, indoor recreational, and special residential uses.
Intensity: A measure of development, designed principally to regulate land use in accord with the design function and carrying capacity of
the street on which it is located.
Interior Lot: A lot having frontage on only one street.
Junked or abandoned vehicle: any vehicle without a current and valid license plate which is not moved or subject to physical repair or
restoration for a period in excess of 90 days . An inoperable wrecked vehicle with a current license plat shall also be considered a junked
vehicle.
Junkyard: any location, including a residential area, establishment, or place of business that is maintained, operated, or used for storing junk.
The term shall not include County operated or approved and permitted sanitary landfills. Yard sales of forty-eight hours duration or less shall
be exempt from the provisions of this section.
Kennel: For purposes of this ordinance, a kennel is a commercial site that houses animals for the purpose of a business.
Jurisdiction: That area over which the governing body has authority for planning and development permitting under the applicable laws of
the State of South Carolina.
Lake: A body of water one acre or more in surface area, created either by a manmade or natural dam or other means of water
impoundment.
Landscaped Area: An area that is permanently devoted and maintained to the growing of shrubbery, grass and other plant material. Land-
Disturbing Activity: Any activity that may result in soil erosion from water or wind and the movement of sediments into state waters or onto
lands within the state, including, but not limited to, clearing, dredging, grading, excavating, transporting and filling of land but not
including those practices that are exempt under the applicable Pickens County Stormwater Ordinance.
Landscape Materials: Any combination of living plant materials and nonliving materials such as rock, pebbles, sand, mulch, pavers, berms,
fencing, walls, fountains and other decorative materials.
Landscaping: Landscaping shall consist of shrubs, vines, turf, ground cover and other landscape materials which are utilized to enhance the
aesthetic and functional qualities of a site.
Land Use Permit: Approval granted by the Planning Commission, after the holding of a public hearing, of several, specific uses of property
and structures. Also referred to as land use approval.
Large Scale Project: Any project that is capable of generating 1,000 average daily vehicle trips or more . Anticipated vehicle trips will be
based upon the latest edition of Trip Generation published by the Institute of Transportation Engineers.
Larger than Utility Runway: Means a runway that is constructed for an intended to be used by propeller driven aircraft greater than 12,500
maximum gross weight and by jet powered aircraft.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-10
Article 16: Glossary of Defined Terms
Legal Nonconforming: uses, structures, lots and signs that lawfully existed prior to the adoption of this Ordinance or a subsequent
amendment, but no longer conform to the new regulations. The primary intent of the treatment of nonconformity is to allow con tinuation of
these uses, structures, lots and signs until the end of their useful life, while encouraging conformance to the new regulations when it
becomes reasonable.
Licensee: A person in whose name a Sexually Oriented Business Regulatory License to operate a sexually oriented business has been
issued, as well as the individual listed as an applicant on the application for a Sexually Oriented Business Regulatory Licen se.
Live Entertainment: A person who appears nude, semi-nude, or a performance, which is characterized by the exposure of “specified
anatomical areas” or “specified sexual activities.”
Lot: A parcel or tract of land held in single ownership.
1) Corner Lot: Any lot bounded by two (2) streets at their intersection.
2) Cul-de-sac lot: A lot having at least 50 percent of its lot frontage on a cul-de-sac turnaround, as measured along the street right- of-
way line. The sidelines of a cul -de-sac lot must be perpendicular or radial to the street right -of-way lines in accordance with the
Project Design Standards Article of this Code, and shall meet the frontage requirements of this Code.
3) Double-Frontage Lot (i.e., a through lot): A lot bounding on 2 or more streets, but not at their intersection, so that it is not a corner
lot unless said corner lot has frontage on 3 or more sides.
4) Interior Lot: A lot having frontage on only one street.
Lot Area: The total horizontal area included within lot lines.
Lot Line: The boundary dividing a given lot from the street or adjacent lots; the boundary defining the limit of ownership of a propert y.
a. Front Lot Line: Any boundary line of a lot that abuts a public street right -of- way line. A lot adjacent to more than one
street will have more than one front lot line.
b. Rear Lot Line: Any boundary line of a lot that does not intersect with a public street right -of-way line and is not a front
lot line.
c. Side Lot Line: Any boundary line of a lot that intersects with a public street right-of-way and is not a front lot line.
Lot of Record: A lot which is part of a subdivision recorded in the office of the of Deeds, or a lot described by metes and bounds, the
description of which has been so recorded.
Lot width: The distance from one sideline to the other sideline measured at the mini - mum front building line of the lot.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-11
Article 16: Glossary of Defined Terms
Major subdivision: A “major subdivision” is any subdivision that does not qualify as a “minor subdivision.” A major subdivision commonly
involves the construction of a new street or widening of an existing roadway, the provision of stormwater drainage facilities, or the
construction or improvement of public utilities, or which otherwise has 4 or more lots (not in a large lot minor subdivision) , building sites or
other divisions.
Mansard: A steeply sloped, roof-like façade architecturally similar to a building wall.
Manufactured Home: A dwelling fabricated in an off-site facility for installation or assembly at the building site, bearing a label certifying that it
is constructed in compliance with the National Manufactured Housing Construction and Safety Standards Act of 1974, 42 U.S.C. 5401, et
seq.), which first became effective on June 15, 1976. The term “manufactured home” includes a structure, transportable in one or more
sections, which, in the traveling mode, is 8 body feet or more in width or 40 body feet or mo re in length or, when erected on site, is 900 or
more square feet in floor area, has a mini - mum 3:12 roof pitch, covered with shingles commonly used in standard residential construction,
covered with an exterior material customarily used on site built homes, including vinyl or aluminum lap siding, wood, masonit e, or other
materials similar to the exterior siding commonly used in standard residential construction, and which is built on a permanen t chassis and
designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities and includes the
plumbing, heating, air -conditioning, and electrical systems contained therein; except that such term includes any structure which meets all
the requirements of this definition except the size requirement and with respect to which the manufacturer voluntarily files a certification
required by the Secretary of Housing and Urban Development and complies with the standards established under the National
Manufactured Housing Construction and Safety Standards Act of 1974, 42 U.S.C. 5401, et seq.
Manufactured Home Park/Mobile Home Park: Any lot or parcel under single ownership on which 2 or more manufactured homes are to be
located or intended to be located for purposes of residential occupancy.
Marquee sign: See under “Building Sign.”
Mean Sea Level: The average height of the sea for all stages of the tide. It is used as a reference for establishing various elevations withi n
the flood plain. For purposes of this Code, the term “mean sea level” is synonymous with National Geodetic Vertical Datum (NG VD).
Measurement (method): Unless otherwise noted, when the UDSO specifies a required distance between two uses the distance shall be
measured in a straight line from the nearest portion of the building, structure or facility associated with the proposed use.
Minimum front setback: The minimum distance required by the zoning on a property between an adjoining street and the façade of a
principal building on the property.
Minor subdivision: A “minor subdivision” is one in which no improvements (such as new streets, storm - water drainage facilities or public
utilities) are to be made.
Mobile Home: A dwelling manufactured prior to June 15, 1976, transportable in one or more sections, built on a permanent chassis and
designed to be used as a dwelling with or without a permanent foundation when connected to the required utilities and includes the
plumbing, heating, air-conditioning, and electrical systems contained therein.
Modular Building or Structure: A structure or building including the necessary electrical, plumbing, heating, ventilating, and other service
systems, manufactured offsite and transported to the point of use for installation or erection, with or without other specifi ed components, as a
finished building, and not designed for ready removal to another site. The term is applicable to all buildings or structures, including
residential, commercial, industrial, institutional, etc. meeting the requirements of the Modular Building's Construction Act (Title 23 Chapter 43
of the South Carolina Code of Laws).
National Geodetic Vertical Datum (NGVD): As corrected in 1929, is a vertical control used as a reference for establishing varying
elevations within the flood plain.
Natural Areas: Areas of undisturbed vegetation or areas replanted with vegetation after construction.
Natural Ground Surface: The ground surface in its original state before any grading, excavation or filling.
Nonconforming: Structures, signs, uses of land and structures, and characteristics of uses that are prohibited under the terms of this
Ordinance, but were lawful at the date of the Ordinance's enactment.
Non-residential Area: an area or locale in which there are three or more established commercial or industrial businesses located
immediately adjacent to one another, either on the same or individual parcels, without being separated by other conflicting u ses.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-12
Article 16: Glossary of Defined Terms
Non-Residential Use: A principal use of land for other than residential purposes, i.e. commercial, industrial, institutional.
NRA Range Source Book: The latest edition of The Range Source Book, as published by the National Rifle Association.
Nude Model Studio: Any place where a person appears in a state of nudity or displays “specified anatomical areas” and is observed,
sketched, drawn, painted, sculptured, photographed, or similarly depicted by other persons who pay money or any other form of
consideration, and such place is not subject to an exemption pursuant to Section 308(q) herein.
Nude, Nudity, or State of Nudity: a) the appearance of a bare human buttock, anus, male genitals, female genitals, or the areola or nipple
of the female breast; or b) a state of dress which fails to completely cover a human buttock, anus, male genitals, female gen itals, pubic
region or areola or nipple of the female breast.
Off-premises directional sign: Any permanent sign, excluding Billboards as defined above, the purpose of which is limited exclusively to the
identification of a use or occupancy located elsewhere and which tell or shows the location, direction or route to such use or
occupancy.
Off Street Parking and Loading Areas: An off-street parking space is an area, not in a street or alley, permanently reserved for the
temporary storage of one automobile and connected with a street or alley by a driveway, which affords ingress and egress.
On-Shore Dock: A structure built on the shore or projecting into the water so that vessels may be moored along its side. This excludes
floating docks or floating portions of docks.
One-Hundred-Year Flood Plain: A land area subject to a 1 percent or greater statistical occurrence probability of flooding in any given year.
Opaque: Impenetrable to view, or so obscuring to view that features, buildings, structures, and uses become visually indistinguishabl e.
Open Space: An area of land or water that is permanently set aside through dedication, designation or reservation to remain in a natural and
unimproved state or that may be improved only for active or passive recreation or enjoyment.
a. Common Open Space: Land or water areas within a development project that are available to or benefit all occupants of
the development on a continuing and permanent basis, such as walking trails, community centers or clubhouses, golf
courses and other recreation areas, protected flood plains or wetlands, and fishing or boating lakes. Common open
space does not include any streets or public rights-of-way, storm water retention areas or yard areas or landscape
areas located on private property.
b. Public Open Space: Land reserved for preservation, leisure or recreational use but dedicated in fee simple to a
governing body or agency to be responsible for operation and maintenance. Public open space may not be reserved for
or dedicated to the exclusive use of the residents of a particular development.
Operate or causes to be operated: To cause to function or to put or keep in operation.
Operator: any person on the premises of a sexually oriented business who is authorized to exercise overall operational control of the
business, or who causes to function or who put or keeps in operation the business . A person may be found to be operating or causing to
operated a sexually oriented business whether or not the person is an owner, part owner, or licensee of the business.
Outparcel: A lot deeded separately from a larger tract for individual development, but generally sharing access with the larger tract.
Outparcels are most generally associated with shopping centers.
Owner: A person having or controlling a majority fee simple interest in a property, or their authorized representative.
Parking Bay: Three or more parking spaces adjacent to one another and aligned side - by-side.
Patron: any person who pays a sexually oriented business any form of consideration for services provided to him or her by the sexuall y
oriented business.
Pennant: Any lightweight plastic, fabric or similar material designed to move in the wind; pennants are often suspended from a rope, w ire, or
string in series. The term “pennant” shall not include a “banner” or an “official or personal flag” as regulated in this Arti cle.
Perennial Stream: A stream that flows throughout the whole year. Perennial streams may be identified as shown as such on a United
States Geologic Service Quad map.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-13
Article 16: Glossary of Defined Terms
Permanent sign: A sign attached to a building, structure, or the ground in some manner requiring a permit and made of materials intended
for more than short-term use.
Person: An individual, proprietorship, partnership, corporation, association, or other legal entity.
Political sign: A temporary sign announcing or supporting political candidates or is- sues in connection with any national, state or local
election.
Pond: All impoundments of water smaller than 1 acre in area.
Portable sign: A sign that is not permanent, affixed to a building, structure or the ground.
Plant Materials: Living plants, such as trees, shrubs, ground cover, grasses and perennial flowering plants, turf, and vines that are suitable
for ornamental and/or functional use.
Playground: a place, other than grounds at a private dwelling that is provided by the public or members of a community for recreation.
Political Sign: A temporary sign announcing or supporting political candidates or issues in connection with any national, state or local
election.
Pond: A body of standing water less than one acre in surface area, created either by a natural dam, or other means of water impound ment.
Portable Sign: A sign that is not permanent, affixed to a building, structure or the ground.
Projecting Sign: A sign that is wholly or partly dependent upon a building for support and which projects more than twelve (12) inches from
such building.
Principal Building: A building in which is conducted a principal use.
Principal Building Setback Line: A line delineating the minimum allowable distance between a property line or the right -of-way line of an
abutting street and a principal building on a lot.
1) Front Building Setback: The minimum allowable distance between the right-of-way line of any abutting street and any part
of a principal building on a lot. The front setback distance is applied along the full length of the right -of-way line and is
parallel to it.
2) Rear Building Setback: The minimum allowable distance between a rear lot line and any part of a principal building on
a lot. The rear building setback extends along and parallel to the full length of the rear lot line.
3) Side Building Setback: The minimum allowable distance between a side lot line and any part of a principal building on
a lot. The side building setback extends along and parallel to the side lot line between the front building setback and a
rear building setback (if any).
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-14
Article 16: Glossary of Defined Terms
Principal Use: The specific, primary purpose for which land or a building is used.
Private Road: A privately owned and maintained right-of-way that is constructed to the standards set forth in Section 1012(c) and provides
vehicular access and road frontage to multiple lots or buildings.
Professional Engineer: An engineer licensed and registered to perform the duties of a professional engineer (P.E.) by the State of South
Carolina.
Project: The entire proposed development project regardless of the size of the area of land to be disturbed.
Project entrance sign: A permanent freestanding sign located at a discernible entrance into a multi-family development, or into a
development containing multiple lots, such as but not limited to a particular residential or commercial subdivision, business center, office park
or industrial park.
Projecting sign: See under “Building Sign.”
Property or Parcel of Land: See “Lot.”
Public Building: any building owned, leased, or held by the United States, the State, the County, or any city, any special purpose district,
or any other agency or political subdivision of the state or the United States, which building is used for governmental purpo ses or other
public purpose.
Public Improvement: The construction, enlargement, extension or other construction of a facility intended for dedication to the public,
including but not limited to a street, curb and gutter, sidewalk, cross drain, catch basin, traffic control and street name sign, or other
roadway appurtenance other than a driveway apron connection; domestic water supply system main, fire hydrant, valve or other
appurtenance other than a supply line to a building; or sanitary sewerage main or outfall, lift station, force main, manhole or other
appurtenance other than a drain line from a building.
Public Open Space: See under “Open Space.”
Recreation Areas: Are designed for specific active recreational uses.
Recreational Vehicle: A motorized camper, converted bus, tent trailer, motor home, or other similar vehicular or portable structure used or
designed for temporary portable housing or occupancy while on vacation or other recreational trip and provided with sleeping
accommodations; not designed or otherwise be used as a permanent dwelling.
Registered Land Surveyor: A land surveyor licensed and registered to perform the duties of a registered land surveyor (R.L.S.) by the
State of South Carolina.
Residential: Used primarily as a living quarters or a dwelling.
Right-of-Way: A general term denoting land, property, or interest there in, usually in a strip devoted to or acquired on County roads when
there is no deeded ROW along a road or highway, the right-of-way shall be considered to be 25 feet from the centerline on each side.
Roadway, controlled access: A state or federal highway (usually median divided) that, by design, may only be accessed from :
1) Public streets where such access is provided by grade separated interchanges consisting of bridge(s) and ramps so that traffi c
entering and exiting said highway can safely merge into and exit from the highway at the posted speed limit; or
2) Public streets where such access is provided at grade level intersections which are designed and permitted by the South
Carolina DOT as part of the highway construction project; or
3) Right in/right out only private drives without median cuts and where such private drives are permitted by the South Carolina DOT
due to extenuating circumstances such as no other means of access.
Controlled access roadways are distinguished from other state and federal roads in that the private driveway access is the
exception to the rule rather than the norm. This definition does not include “limited access roadways.”
Roadway, limited access: A median divided state or federal highway which, by design, may only be accessed from public streets and
where such access is provided by grade separated interchanges consisting of bridge(s) and ramps so that traffic entering and exiting said
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-15
Article 16: Glossary of Defined Terms
highway can safely merge into and exit from the highway at the posted speed limit (an example would be an interstate highway). This
definition does not include “controlled access roadways.”
Roadway Drainage Structure: A device such as a bridge, culvert or ditch, composed of a virtually nonerodable material such as concrete,
steel, plastic or other such material that conveys water under a roadway by intercepting the flow on one side of a traveled way consisting of one
or more defined lanes, with or without shoulder areas, and carrying water to a release point on the other side.
Rock Outcropping: A large mass of stone forming a cliff, promontory, or peak.
Roof sign: See under “Building Sign.”
Scenic Highway/Scenic Byway: A road or highway under Federal, State or County jurisdiction which has been designated through
legislation or some other official declaration for its scenic, historic, recreational, cultural, archeological, or natural qualities. An official
declaration is an action taken by an individual, board, committee, or political subdivision acting with the granted authority on behalf of the
Federal, State or Count Government.
School: an establishment, other than a private dwelling, where the customary processes of education are conducted.
Screen: Natural vegetation or a decorative structure that creates an opaque visual block or obscures an unattractive view. Screening may
consist of any combination of the following, as approved by the Director:
1) Fencing constructed of cedar, redwood, treated wood, or other suitable all-weather material.
2) Masonry walls.
3) Plant materials or natural vegetation.
4) Earthen berms.
For the purpose of this ordinance, a screen is opaque to a height of 6 feet above the ground surface or, for a screen of plan t
materials, has the maximum opacity obtainable with the approved arrangement and species of plant materials, to a height of 6 feet.
Semi-Nude or Semi-nudity: A state of dress in which clothing covers no more than the genitals of a man, or the pubic region and areola of
the breasts of a woman.
Setback: The shortest straight-line distance between a street right-of-way or lot line and the nearest point of a structure or building or
projection therefrom (excluding roof overhangs of 18 inches or less), measured at 90 degrees to the street or lot line.
Setback, Minimum: The shortest distance allowed between a street right-of-way line or any other lot line and any principal or accessory building
on a lot. Minimum setback requirements for buildings are associated with the type of lot line from which the setback is taken ; for instance, a
“side yard setback” is measured from a side lot line.
Sexually-Oriented Business: Includes an adult arcade, adult bookstore, adult retail store or adult video store, adult cabaret, adult motel, adult
motion picture theater, adult theater, nude model studio, or any other business such as a car wash or a health club, which of fers for
consideration, materials or services characterized as depicting “specified sexual activities” or “ specified anatomical areas”, or whose
employees perform services in a state of nudity or semi-nudity.
Sexually Oriented Business Regulatory License: A special annual operating license necessary for a sexually oriented business to do
business in Pickens County. Such license is in addition to a Pickens County Certificate of Compliance or any other state or County
permits. The Sexually Oriented Business Regulatory License also requires the registration of each of each employee and each employee
hired during the operating period authorized by the Sexually Oriented Business Regulatory License.
Shared Driveway: A privately owned and maintained easement that is constructed to the standards set forth in Section 1012(a) and
provides vehicular access and road frontage to no more than three (3) lots or building sites.
Shooting range: An area designed and improved for the purpose of providing a place on which to discharge firearms and encompasses
fixed firing positions/shooting stations, target areas, berms and baffles, and other related components.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-16
Article 16: Glossary of Defined Terms
Shooting range facility : A public or private facility, including individual shooting ranges, surface danger zones or shotfall zones, structures,
parking areas, and other associated improvements, designed for the purpose of providing a place for the discharge of various types of firearms.
Shopping Center: a single parcel containing more than three separate, but connected commercial establishments or separate, but
connected, lease able units for commercial establishments, and totaling more than 3,000 square feet, planned, constructed, and managed as
a total entity with customer parking located on-site.
Shotfall zone: An area within which the shot or pellets contained in a shotgun shell typically fall
Sign: Any structure, display, or device that is used to advertise, identify, direct, or attract attention to a business, institutio n, organization,
person, idea, product, service, event, or location by any means, including words, letters, figures, design characteristics, s ymbols, logos,
fixtures, colors, movement, or illumination.
Sign face: That portion of the surface of a sign structure where words, letters, figures, symbols, logos, fixtures, colors, or other design
elements are or may be located in order to convey the message, idea, or intent for which the sign has been erected or placed. The sign face
may be composed of two or more modules on the same surface that are separated or surrounded by open space or by portions of a sign
structure not intended to contain any advertising message or idea and are purely structural or decorative in nature.
Sign module: Each portion or unit of a sign face that is clearly separable from other such units by virtue of the expression of a complete
thought, message, logo, or idea.
Sign structure: All elements of a freestanding sign, including the sign face, background, or decorative elements related to the presentation or
support of the sign’s message, and the structural supports.
Single-Family Detached Residence: See under “Dwelling.”
Skirting: A continuous covering of masonry, vinyl or other approved materials installed around the periphery of a manufactured
home/mobile home, which extends from the ground to the bottom of the dwelling unit. All non-masonry materials must be specifically
manufactured for use as skirting on manufactured homes/mobile homes.
Solar Farm or Utility-Scale Solar Energy System: a principal use of land for the purpose of generating electricity for commercial sale to the
wholesale electric grid or a third-party entity. A solar farm shall consist of one or more ground-mounted solar energy systems and all related
equipment, including but not limited to, solar panels, arrays, inverters, transformers, storage facilities, substations, and transmission lines.
This definition does not include:
1. A rooftop solar energy system located on a building, where the primary purpose of the system is not the generation of solar e nergy for
commercial sale.
2. A ground-mounted solar energy system that is an accessory use, installed to serve the on -site energy needs of a primary residential or
commercial use on the same lot.
Specified Anatomical Areas: The male or female genitals including the vulva or more intimate parts of the female genitals, a bare human
buttocks, anus, or the areola or nipple of the female breast.
Specified Sexual Activities: Includes any of the following:
a. The fondling or other erotic touching of human genitals, pubic region, buttocks, anus, or female breast.
b. Sex acts, normal or perverted, actual or simulated including intercourse, oral copulation, or sodomy.
c. Masturbation, actual or simulated
d. Excretory functions as part of or in conjunction with any of the activities set forth in a. through c. above.
Stock Yard: An open or closed compound, where livestock is fed, graded, bought, sold, or maintained for transfer.
Street Classifications: See Section 1010 (b)
Structure: Anything constructed or erected with a fixed location on the ground or attached to something having a fixed location on the
ground. Among other things, structures include but are not limited to buildings, driveways, parking lots, walls, fences, sign s, and swimming
pools.
Structure Height: For all structures other than buildings, the vertical distance to the highest point of a structure, as measured from the
average grade at the base of the structure or directly below a projecting structure. See also “Building Height.”
Subdivision: (1) The division of a property or tract of land into two or more tracts or lots; (2) a land development project in which two or more
lots are created, along with the streets and utilities needed to support construction of buildings on the lots.
Substantial damage: damage of any origin sustained by a structure whereby the cost of restoring the structure to its before damaged
condition would equal or exceed 50 percent of the market value of the structure before the damage occurred. Such repairs may be
undertaken successively, and their costs counted cumulatively. Please refer to the definition of "substantial improvement".
Substantial improvement: any repair, reconstruction, rehabilitation, addition, or other improvement of a structure, the cost of which equals or
exceeds 50 percent of the market value of the structure before the start of construction of the improvement. This term includes
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-17
Article 16: Glossary of Defined Terms
structures that have incurred substantial damage, regardless of the actual repair work performed. The term does not, however, include
either:
a. any project of improvement to a structure to correct existing violations of State or local health, sanitary, or safety code
specifications which have been identified by the local code enforcement official and which are the minimum necessary to assur e
safe living conditions (does not include American with Disabilities Act compliance standards); or,
b. any alteration of a historic structure, provided that the alteration will not preclude the structure's continued designation as a
historic structure.
c. Permits shall be cumulative for a period of five years. If the improvement project is conducted in phases, the total of all costs
associated with each phase, beginning with the issuance of the first permit, shall be utilized to determine whether "substant ial
improvement" will occur.
Surface Danger Zone : Any area, typically fan shaped, that may reasonably expect projectile impact resulting from direct fire, including
misdirected and accidental discharges and ricochets from any firearm . The size and shape of the surface danger zone may vary based on
the projectile type and any implemented mitigation efforts.
Surface Mining: Any activity constituting all or part of a process for the removal of minerals, ores, and dimension stone, and other solid
matter for sale or for processing or for consumption in the regular operation of a business.
Target Line: A line parallel to the firing line along which targets are placed.
Tattoo Artist: any staff member 21 years of age or older who practices body tattooing at the tattoo facility and who meets the requirements of
the State of South Carolina and Pickens County.
Tattoo Facility: any room, space, location, area, structure, mobile unit, or business, or any part of any of these places, where tattooing is
practiced or where the business of tattooing is conducted and which is licensed by DHEC as a tattoo facility.
Tattoo or Tattooing: to indelibly mark or color the skin by subcutaneous introduction of nontoxic dyes or pigments . The practice of tattooing
does not include the removal of tattoos, or the practice of branding, cutting, scarification, skin braiding, or the mutilatio n of any part of the
body.
Telecommunications: The transmission between or among points specified by the user, of information of the user's choosing, without
change in the form or content of the information as sent and received. (as defined in the Federal Communications Act of 1996) .
Temporary event: An activity having a specific duration or the end of which is related to a specific action, usually lasting for only a few da ys
or months at a time. Temporary events include but are not limited to such activities as:
1) The offering of a property or premises for sale or rent;
2) An election, political campaign, referendum, or ballot proposition put to the voters as part of city, county, state, or federal
governance;
3) Special business promotions, such as but not limited to “grand openings,” “close- out sales,” carnivals and seasonal sales
events;
4) A yard sale;
5) The construction of a building or development project, or the rehabilitation, remodeling, or renovation of a building; or
6) A special event by a nonprofit organization, such as a community fair or religious assembly.
Temporary sign: A sign or advertising display constructed of cloth, canvas, fabric, plywood, or other light material and designed or
intended to be displayed for a short period of time.
Temporary Wireless Communication Facility : Portable equipment without permanent foundation that is used for a limited period while a
permanent facility is under construction, under repair, or during a special public event or emergency. Also called a Cell -On-Wheels (COW).
Tenant: A natural person, business or other entity that occupies land or buildings by title, under a lease, or through payment of ren t; an
occupant, inhabitant, or dweller of a place.
Terminal, bus or truck: A station or like facility where vehicles, passengers, or goods begin or end a journey.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-18
Article 16: Glossary of Defined Terms
Tiny Home: a self-contained dwelling unit built with any IRC compliant method and materials that is not on wheels (sometimes referred to as
a Park Model) and is less than 600SF.
Townhouse: See under “Dwelling.”
Transfer of Ownership: Includes any of the following:
a. The sale, lease or sublease of the business.
b. The transfer of securities that constitute a controlling interest in the business, whether by sale, exchange, or similar
means.
c. The establishment of a trust, gift or other similar legal device which transfer the ownership or control of the business,
except for transfer by bequest or other operation of law upon the death of the person possessing the ownership or
control.
Travel Trailer: See “recreational vehicle.”
Tree: Any living, self-supporting woody perennial plant which normally obtains a trunk diameter of at least 2 inches and a height of at least
10 feet, and typically has one main stem or trunk and many branches.
Tree Save Area: All areas designated for the purpose of meeting tree density requirements, saving specimen trees, or preserving natural
buffers.
Turf: Ground cover composed of one or more species of perennial grass that is grown as a permanent lawn.
Two-Family Dwelling: See under “dwelling.”
Understory Tree: A small deciduous tree that forms a layer of vegetation under the canopy trees in a forest. Examples of such trees
include dogwoods, sourwoods, fruit trees, and others.
Use: The purpose for which land or a building or other structure is designed or arranged, or for which it is occupied. See also “P rincipal Use”
and “Accessory Use or Structure.”
Variance: A grant of relief from a term or terms of this ordinance.
Vehicular sign: Any sign placed, mounted, painted on or affixed to a motor vehicle, freight, flatbed or storage trailer or other conveyance when
same are placed or parked in such a manner as to be viewed or intended to be viewed from the public right(s)-of-way except that this definition
shall not apply when:
1) Such conveyances are actively being used to transport persons, goods or services in the normal course of business;
2) When such conveyances are parked in an inconspicuous area; or
3) When such conveyances are actively being used for storage of construction materials for, and on the same lot with a bona fide
construction project for which building and other applicable permits have been issued and where construction is underway and
provided said conveyances are located within designated storage areas.
Vested Right: Vested right means the right to undertake and complete the development of property under the terms and conditions of a site
specific development plan in conjunction with this ordinance and in conformity with county land development ordinances and up on final
approval by the county.
View Lane: In regard to lake front properties, property owners are allowed to establish a "view lane". View lanes are portions of the se tback
area and buffer that may be slightly altered to enhance lake and/or surrounding landscape views. The view lane may not exceed 2S% of the
lot width as measured at the full pool mark. Within the view lane, trees may be limbed up to fifty percent (50%) of their hei ght. Selective
thinning or pruning are allowed within the view lane, but vegetation, including shrubs and bu shes ,should not be completely removed nor
pruned to a height less than 4 feet. No vegetation should be pruned in a manner that would result in probable death or disease
introduction. Mechanical clearing with heavy equipment is not allowed. Thinning and pruning .should be generally. accomplished with
hand-held tools. Land owners are encouraged to consult with landscape professionals or the Clemson Cooperative Extension Service f or
horticultural advice.
Viewing Room: means the room, booth, or area where a patron of a sexually oriented business would ordinarily be positioned while
watching a film, videocassette, video reproduction, or live production.
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-19
Article 16: Glossary of Defined Terms
Violation: the failure of a structure or other development to be fully compliant with these regulations.
Visual Runway: Means a runway intended solely for the operation of aircraft using visual approach procedures.
Wall sign: See under “Building Sign.”
Wetlands: Freshwater areas that are inundated or saturated by surface or groundwater at a frequency and duration sufficient to support, and
that under normal circumstances do support, a prevalence of vegetation typically adapted for life in saturated soil condition s. Wetlands
generally include swamps, marshes, bogs and similar areas.
Wetlands, Protected: Those wetlands identified on the National Wetlands Inventory maps prepared by the U.S. Fish and Wildlife Service, or
otherwise approved by the U.S. Army Corps of Engineers based on competent studies prepared by a registered and qualified
professional engineer.
Window Sign: See under “Building Sign.”
Wireless Communication Facility: A structure, facility, or location designed, or intended to be used as, or used to support, antennas, as well
as any functional equivalent equipment used to transmit or receive wireless communication signals. It includes, without limit , the tower
compound, freestanding towers, guyed towers, monopole towers, lattice towers, and concealed subport structures housing wireless
communications antennas. It is a structure and its associated equipment intended for transmitting and/or receiving radio, television,
cellular, paging, personal communications services, or microwave telecommunications, but excluding those used exclusively for fire,
police, and other publicly dispatched radio and television reception and private citizen’s bans, amateur radio and other similar
telecommunications.
Yard: An area that lies between the principal building on a lot and the nearest lot line.
1) Front Yard: A yard situated along any public street right-of-way or private road easement.
2) Rear Yard: A yard situated along a rear lot line.
3) Side Yard: A yard situated along a side lot line, but not extending into a front or rear yard.
(Section Amended 4/1/2024)
Pickens County UDSO: Amended 2/6/10; 4/1/24 16-20
Article 16: Glossary of Defined Terms
BLANK PAGE
Pickens County UDSO: Amended 2/6/10; 4/1/24
Adding Commercial
Lodging to Article 12
for Planning
Commission Review
Article 12. Procedures and Permits
Table of Contents Page
Section 1201 Purpose of Article 12 ................................................................................................................................................ 12-1
Section 1202 Definitions related to procedures ............................................................................................................................ 12-1
Section 1203 Overview – land development ................................................................................................................................... 12-1
1203 (a) Land use permits ...................................................................................................................................................................... 12-1
1203 (b) Minor subdivisions .................................................................................................................................................................... 12-2
1203 (c) Major subdivisions ................................................................................................................................................................... 12-2
1203 (d) Staff review .............................................................................................................................................................................. 12-3
1203 (e) Multi-family and nonresidential projects................................................................................................................................... 12-3
Section 1204 Application intake and processing .......................................................................................................................... 12-3
1204 (a) Application submission process............................................................................................................................................... 12-3
Section 1205 Land use approval .................................................................................................................................................... 12-3
1205 (a) Initiation of land use approval .................................................................................................................................................. 12-3
1205 (b) Land use sketch plans (major subdivisions) ............................................................................................................................ 12-4
1205 (c) Land use sketch plans (multi-family and nonresidential) ......................................................................................................... 12-4
1205 (d) Process for land use approval ................................................................................................................................................. 12-5
1205 (e) Decision actions for land use approval .................................................................................................................................... 12-6
1205 (f) Standards for land use approval consideration ........................................................................................................................ 12-6
1205 (g) Withdrawal of land use request ............................................................................................................................................... 12-7
1205 (h) Effect of land use approval ...................................................................................................................................................... 12-7
1205 (i) Conditional approval ................................................................................................................................................................. 12-8
Section 1206 Minor subdivisions ................................................................................................................................................... 12-8
Section 1207 Project approval ......................................................................................................................................................... 12-8
1207 (a) Responsibility for project approval ............................................................................................................................................ 12-8
1207 (b) Procedure for project approval ................................................................................................................................................. 12-9
Chart 12.1 ............................................................................................................................................................................................. 12-10
Chart 12.2 ............................................................................................................................................................................................. 12-11
1207 (c) General standards for project approval .................................................................................................................................. 12-12
1207 (d) Preliminary plat or site plan requirements .............................................................................................................................. 12-12
1207 (e) Engineer and owner certifications........................................................................................................................................... 12-13
1207 (f) Evidence of project approval ................................................................................................................................................... 12-13
Section 1208 Development plans .................................................................................................................................................. 12-14
1208 (a) General requirements ............................................................................................................................................................. 12-14
1208 (b) Erosion and sedimentation control plan.................................................................................................................................. 12-14
1208 (c) Stormwater management plan ................................................................................................................................................ 12-14
1208 (d) Street improvement plan......................................................................................................................................................... 12-14
1208 (e) Buffer plans............................................................................................................................................................................. 12-15
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
120
8 (f) Public utility plans .................................................................................................................................................................... 12-15
Section 1209 Development permit ................................................................................................................................................. 12-16
1209 (a) Responsibility for development actions .................................................................................................................................. 12-16
1209 (b) Development activities authorized .......................................................................................................................................... 12-16
1209 (c) Process for approval of development permit .......................................................................................................................... 12-16
1209 (d) Issuance of development permit ............................................................................................................................................. 12-17
1209 (e) Expiration of development permit ........................................................................................................................................... 12-17
Section 1210 Flood area development permit and certification requirements ......................................................................... 12-18
1210 (a) Flood area permit required ..................................................................................................................................................... 12-18
1210 (b) Application process for a flood area development permit ....................................................................................................... 12-18
Section 1211 Driveway permit ....................................................................................................................................................... 12-19
1211 (a) Driveway permit; when required ............................................................................................................................................. 12-19
Section 1212 Final subdivision plat .............................................................................................................................................. 12-19
1212 (a) Responsibility.......................................................................................................................................................................... 12-19
1212 (b) Procedures for final plat approval ........................................................................................................................................... 12-19
1212 (c) General standards for final plat ............................................................................................................................................... 12-20
1212 (d) Final plat requirements ........................................................................................................................................................... 12-20
1212 (e) Surveyor and land owner certificates...................................................................................................................................... 12-21
1212 f) Statement of private covenants ................................................................................................................................................ 12-22
1212 (g) Certificate of final subdivision plat approval............................................................................................................................ 12-22
1212 (h) Creation of homeowners association...................................................................................................................................... 12-23
1212 (i) Acceptance of public improvements ........................................................................................................................................ 12-23
Section 1213 Project approvals and establishment of vested rights ......................................................................................... 12-23
1213 (a) Site-specific subdivision plans ................................................................................................................................................ 12-23
1213 (b) Nonresidential site-specific development plans ...................................................................................................................... 12-23
Section 1214 B uilding permitting .................................................................................................................................................. 12-24
1214 (a) Procedures to obtain a building permit ................................................................................................................................... 12-24
1214 (b) Building inspection .................................................................................................................................................................. 12-25
1214 (c) Construction in flood hazard area ........................................................................................................................................... 12-25
1214 (d) Certificate of occupancy ......................................................................................................................................................... 12-26
Section 1215 Sign permitting and modifications ......................................................................................................................... 12-26
Section 1216 Text amendments ..................................................................................................................................................... 12-26
1216 (a) Initiation of text amendments .................................................................................................................................................. 12-26
1216 (b) Decision actions for text amendments .................................................................................................................................... 12-26
1216 (c) Effect of text amendment approval ......................................................................................................................................... 12-27
Section 1217 Temporary suspension of permitting during application review ........................................................................ 12-27
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
Art
icle 12. Procedures and Permits
Sec. 1201 P
urpose of Article 12.
This
Article describes the process through which certain land uses may be approved on a property, the approval process for construction of
subdivisions and other land development projects, and the procedures for amendments to the text of this Development Standards Ordinance.
Sec. 1202 D
efinitions related to procedures.
Appli
cant: A property owner or their authorized representative who has petitioned the County for approval of a land use permit,
development permit, building permit, hardship variance, or appeal, or any other authorization for the use or development of t heir
property under the requirements of this Development Standards Ordinance.
Application: A petition for approval of a land use permit, development permit, building permit, hardship variance, or appeal, or any
other authorization for the use or development of a property under the requirements of this Development Standards Ordinance.
As-Built Survey Drawings: Drawings specifying the dimensions, location, capacities, and operational capabilities of structures and
facilities as they have been constructed.
Building Code: The technical codes approved for enforcement or otherwise adopted or adopted as amended by the General
Assembly of the State of South Carolina.
Condition of Land Use Permit Approval: A requirement adopted by the Planning Commission at the time of approval of a land use
permit, placing greater or additional requirements or restrictions on the property than provided in this Development Standards
Ordinance in order to reduce an adverse impact of the land use and to further the protection of the public health, safety, or general
welfare.
Comprehensive Plan: The Comprehensive Plan for the County, prepared, adopted and as amended from time to time in
accordance with the South Carolina Local Government Comprehensive Planning Enabling Act of 1994.
Land Use Permit: Approval granted by the Planning Commission, after the holding of a public hearing, of several, specific uses of
property and structures. Also referred to as land use approval.
Owner: A person having or controlling a majority fee simple interest in a property, or their authorized representative.
Public Improvement: The construction, enlargement, extension or other construction of a facility intended for dedication to the
public, including but not limited to a street, curb and gutter, sidewalk, cross drain, catch basin, traffic control and street name sign,
or other roadway appurtenance other than a driveway apron connection; domestic water supply system main, fire hydrant, valve
or other appurtenance other than a supply line to a building; or sanitary sewerage main or outfall, lift station, force main, manhole
or other appurtenance other than a drain line from a building.
Vested Right: Vested right means the right to undertake and complete the development of property under the terms and conditions
of a site-specific development plan in conjunction with this ordinance and in conformity with county land development ordinances
and upon final approval by the county.
Sec. 1203 O
verview—land development.
The fol
lowing presents a summary of the procedures involved in the land development approval and construction regulation process.
1203 (a) Lan
d use permits.
Cert
ain uses of land, those identified in detail in Article 3, and listed below, require the submittal of an application and require a hearing
before and approval of the Planning Commission. The Planning Commission must approve the land use prior to development and
construction. A land use request for a major subdivision, a multi-family project, or certain non-residential projects must include a sketch plan
or concept plan showing the proposed lots, layout of the buildings, parking lots, etc.
Uses
requiring a hearing before and approval from the Planning Commission:
1) Recreation Vehicle (RV) Parks and Campgrounds
2) Motorized Vehicle Tracks
3) Mining and Extracting Operations
12-1
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24 4
) Outdoor Shooting Ranges
5) Stockyards, Slaughterhouses, Feedlots, Kennels, and Animal Auction Houses
6) Golf Course
7) Sexually Oriented Business
8) Certain Public Service Uses
a. Landfills
b. Water and Sewerage Treatment Facilities
c. Electrical Substations
d. Prisons
e. Recycling Stations
f. Transfer Stations
g. Schools
h. Water and Sewer Lines
i. Junkyards
9) Large Scale Projects
10) Major Subdivisions
11) Junkyards
12) Communications Towers
13) Multi-Family Developments/Townhomes (3 or more units)
14) Manufactured Home Park
15) Prisons
16) Sewerage Treatment Plants
17) Landfills
18) Tattoo Facilities
19) Expansion by 25% or greater of the uses listed above (2/16/10)
20) Commercial Lodging
1203 (b) Minor subdivisions.
Because a Minor Subdivision does not involve any new public road and minimal construction or installation of improvements, it can be
reviewed under a much more simplified process that that applicable to Major Subdivisions.
Approval of a minor subdivision shall be conducted as follows:
1) Approval of a minor subdivision plat by the Planning Department upon referral to the Planning Commission, will authorize
recordation of the plat with the Register of Deeds.
2) After recordation of the minor subdivision plat, the lots may be sold, and septic permits, building permits, and driveway permits on
the lots may be obtained.
1203 (c) Major subdivisions.
Permitting and construction of a major subdivision will be conducted as follows:
1) The Planning Commission must first conduct a public hearing on the proposed land use and approve the sketch plan of the
proposed subdivision.
2) Project Approval is granted by planning staff upon review and approval of a Preliminary Subdivision Plat.
3) A Development Permit is issued by the Planning Department based on review and approval of development plans for construction
of the subdivision and approval of soil and erosion and stormwater plans.
4) Receipt and approval by the Planning Department of accurate surveys of the as-built condition of public improvements is required
in order to allow filing of a Final Plat.
12-2
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
5) Approv
al of a Final Subdivision Plat by the Planning Department will authorize recordation of the plat with the Register of D eeds.
6) After recording of the Final Plat, the lots may be sold and building permits on the lots may be obtained.
7) The developer will be responsible for maintenance of all public improvements for a minimum of one year and at least until
development has been completed on seventy-five percent (75%) of the lots.
8) All public improvements will be inspected by the County prior to the end of the maintenance period. After the developer has m ade
any required repairs, public acceptance of the improvements shall be issued by the County Engineer.
1203 (d) S
taff Review.
The Pl
anning Department may approve subdivisions of property of not more than ten (10) lots or development units. The director may refer
subdivisions of any size to the Planning Commission for Land Use Approval based upon staff evaluation of the overall potential impact of
that subdivision on the community.
1203 (e) Mul
ti-family and nonresidential projects.
1) Multi-family and certain non-residential projects must first obtain land use approval from the Planning Commission prior to project
approval and permitting.
2) Project Approval is granted by the Planning Department upon review and approval of a Site Plan for the project.
3) A Development Permit is issued by the Planning Department based on review and approval of development plans for construction
of the project and approval of soil and erosion and stormwater plans.
4) A Building Permit is issued by the Building Codes Administration department based on review and approval of architectural plans.
Buildings falling under the authority of the State Fire Marshal shall be approved by the Fire Marshal prior to issuance of the building
permit.
5) Receipt by the Planning Department of accurate surveys of the as -built condition of all required site improvements is required in
order to authorize the issuance of a Certificate of Occupancy.
6) Permanent electric power and occupancy of the building is authorized by the Building Codes department based on final inspection
and issuance of a Certificate of Occupancy.
Sec. 1204 A
pplication intake and processing.
1204 (a) Appl
ication submission process.
An appli
cation for any permit or approval under this Article or for a special exception variance or hardship variance under the Appeals Article
of this ordinance will first be considered as follows:
1) If the application is for approval of a minor subdivision plat, refer to Sec. 1206 for the short cut procedures.
2) If the application is for any other type of approval or permit, refer to the appropriate sections of this Article or Article 13 for
procedures pertinent to the request.
Sec. 1205 La
nd Use Approval
Cert
ain uses of property and/or structures must have Planning Commission approval under the procedures in this Section. In addition,
changes in the conditions of approval pertaining to a specific land use approval may also be approved by the Planning Commission following
the procedures in this Section.
Howev
er, no land use approval shall become effective unless it shall have first been submitted to the Pickens County Planning Commission
for review and approval, as provided in this Section.
1205 (a) Ini
tiation of land use approval.
1) An appli
cation for a land use permit affecting any property or properties may be initiated by the owner of any property in Pi ckens
County or by their authorized representative.
12-3
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
2) All
applications shall be submitted to the Planning Department on the Department’s application forms. A fee, if any, as set b y
County Council from time to time, shall accompany all applications. Completed forms, plus any information the applicant feel s to
be pertinent is to be filed with the Planning Department
3) A pre-application meeting should be arranged and held with a Planning Department staff member to review the requirements of
the DSO and site-specific issues prior to the submittal of an application. This can be waived by staff.
4) The Planning Department shall review the application for completeness within 5 days of submission. Incomplete or improper
applications will be returned to the applicant.
(Sec
tion Amended 4/1/2024)
1205 (b) L
and use sketch plans (major subdivisions).
1) An appli
cation for a land use permit for a major subdivision shall be accompanied by a sketch plan.
2) A sketch plan must be prepared by a professional engineer, a registered land surveyor, a landscape architect, or a certified land
planner. The applicant may prepare the concept plan if approved by the Planning Department
3) The sketch plan shall be drawn to approximate scale on a boundary survey of the tract or on a property map showing the
approximate location of the boundaries and dimensions of the tract.
4) The sketch plan shall show, at a minimum, the following:
a. Proposed name of the development
b. Acreage of the entire development
c. Location map
d. Proposed lot layout
e. Minimum lot size with anticipated overall density (lots/acre)
f. Setbacks, with front setbacks shown, side and rear may be stated
g. All proposed rights-of-way with applicable widths
h. Natural features located on the property
i. Man-made features both within and adjacent to the property including:
1. Existing streets and names (with ROW shown)
2. City and County boundary lines
3. Existing buildings to remain
j. Proposed areas of public dedication (conservation areas/open space)
k. Flood plains and areas prone to flooding
l. Such additional information as may be useful to permit an understanding of the proposed use and development of
the property.
1205 (c) Lan
d use sketch plans (multi-family and non-residential)
1) An appli
cation for a land use permit for a multi-family project or a non-residential project shall be accompanied by a sketch plan.
2) A sketch plan must be prepared by a professional engineer, a registered land surveyor, a landscape architect, or a certified land
planner. The applicant may prepare the sketch plan if approved by the Planning Department
3) The sketch plan shall be drawn to approximate scale on a boundary survey of the tract or on a property map showing the
approximate location of the boundaries and dimensions of the tract.
4) The sketch plan shall show, at a minimum, the following:
a. Proposed name of the development
b. Acreage of the entire development
c. Location map
d. Proposed building(s) location(s)
e. Anticipated property density stated as a FAR (Floor to Area Ratio)
f. Setbacks, with front setbacks shown, side and rear may be stated
g. Proposed parking areas
12-4
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
h. Propos
ed property access locations
i. Natural features located on the property
j. Man-made features both within and adjacent to the property including:
1. Existing streets and names (with ROW shown)
2. City and County boundary lines
3. Existing buildings to remain
k. Required and proposed buffers and landscaping
l. Flood Plains and areas prone to flooding
m. Such additional information as may be useful to permit an understanding of the proposed use and development of the
property.
1205 (d) P
rocess for land use approval.
Befor
e the Planning Commission may take final action on a proposed land use permit, a public hearing shall first be held on the proposal.
1) Publi
c notice.
a. A land us
e request shall be heard at a public hearing only upon:
b. At least fifteen (15) days prior to the Planning Commission’s public hearing, notice shall be published in a newspaper of
general circulation within the county. The notice shall state the time, place, and purpose of the public hearing.
c. At least fifteen (15) days prior to the public hearing, a sign or signs shall be posted on the property stating the date, time,
place, and purpose for the Planning Commission public hearing. One such sign shall be placed in a conspicuous location
along each public street frontage of the property for which the land use permit has been requested. If the property has
no public street frontage, the sign shall be placed on each street from which access is, or will be, gained to the property.
2) Publi
c hearings; procedures.
a. The publi
c hearing held by the Planning Commission will be conducted in the following manner:
b. The Chair, or an appointed designee who will act as the Presiding Official, will convene the public hearing at the
scheduled time and place.
c. The Presiding Official will call for each application/request to be presented.
d. All
persons wishing to speak as a proponent or opponent of an application/proposal must first sign in with Planning Staff,
designating which public hearing item they wish to address and their position (for or against). At the appropriate time,
the Presiding Official will call for the proponents and opponents in the order signed in. For those persons not signed in,
the Presiding Official will call for final comments prior to applicant rebuttal. If time permits, additional comments will be
considered.
e. No person in attendance is to speak unless first formally recognized by the Presiding Official. Upon rising to speak, each
person recognized is to state his name or her name and home address.
1. The Presiding Official may place reasonable limits on the number of persons who may speak for or
against a proposal, on the time allowed for each speaker, and on the total time allowed for
presentation of and opposition to the proposal (giving equal time to both proponents and opponents).
2. No less than ten (10) minutes is to be provided for all of those individuals speaking in support of an
application (including the applicant’s presentation) and no less than ten (10) minutes is to be provided
for all those individuals speaking against; unless such proponents or opponents take less time than
the minimum allotted time allowance.
3. If reasonable time limitations permit, any member of the general public may speak at the public
hearing.
f. The applicant, or his/her representative, will be allowed to speak first in order to present the application to the
Commission. Others in support of the application, if time permits, will then be allowed to speak. If support in written form
has been received by Planning Staff, this will be entered into the official record at this time.
12-5
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
g. Foll
owing the presentation by the applicant, a staff report and recommendation from Pickens County staff shall be
presented.
h. Those individuals in opposition will then have an opportunity to address the Planning Commission. If opposition in written
form has been received by Planning Staff, this will be entered into the official record at this time.
i. If warranted, the applicant may then be allowed up to three (3) minutes for rebuttal. Such rebuttal must be limited to
points or issues raised by opponents to the application.
j. The members of the Planning Commission may ask questions at any time of the applicant, proponents, or opponents.
Time devoted to such questions and answers will not be counted against any time limitations that have been imposed.
1205 (e) Deci
sion actions for land use approval.
Befor
e the Planning Commission may take final action on a proposed land use permit, a public hearing shall be held on the proposal as
provided for above. After the public hearing, the Planning Commission will be guided by the following:
1) The Pl
anning Commission shall have 60 days following its public hearing in which to take action on the request. Failure to take
action with the prescribed time frame shall constitute automatic approval of the request as originally submitted and presented at
the public hearing.
2) In considering a land use application, action shall be taken by vote of the members present.
a. A motion to approve or deny an application must be approved by an affirmative vote of the majority of the quorum in
order for the motion to be approved.
b. If a motion to approve an application fails, the application is automatically denied. If a motion to deny an application fails,
another motion would be in order.
c. A tie vote on a motion for approval of an application shall be deemed a denial of the application. A tie vote on any other
motion shall be deemed to be no action, and another motion would be in order.
d. If no action is taken on an application, it shall be considered tabled and action deferred to the next regular meeting of
the Planning Commission.
3) In taking final action on an application, the Planning Commission may:
a. Approve, approve with conditions, or deny the proposal; or,
b. Allow withdrawal if so requested by the applicant; or,
c. Table the proposal for consideration at its next scheduled meeting.
4) A decision of the Planning Commission may be appealed as provided for in the South Carolina Code of Laws, § 6-29-1150.
(Sect
ion Amended 2/16/10)
1205 (f) S
tandards for land use approval consideration.
1) In cons
ideration of a land use permit, the Planning Commission shall consider factors relevant in balancing the interest in promoting
the public health, safety, or general welfare against the right of the individual to the unrestricted use of property and shall specifically
consider the following objective criteria. Due weight or priority shall be given to those factors that are appropriate to the
circumstances of each proposal:
a. Is the proposed use consistent with other uses in the area or the general development patterns occurring in the area?
b. Will the proposed use not adversely affect the existing use or usability of adjacent or nearby property?
c. Is the proposed use compatible with the goals, objectives, purpose and intent of the Comprehensive Plan?
d. Will the proposed use not cause an excessive or burdensome use of public facilities or services, including but not limited
to streets, schools, water or sewer utilities, and police or fire protection?
e. Is the property suitable for the proposed use relative to the requirements set forth in this development ordinance such
as off-street parking, setbacks, buffers, and access?
f. Does the proposed use reflect a reasonable balance between the promotion of thepublic health, safety, morality, or
general welfare and the right to unrestricted use of property?
12-6
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
2) Change in c
onditions of land use approval.
Any appl
ication that proposes a change in the conditions of approval previously established by the Planning Commission through
action on a land use permit request shall be reviewed in light of the standards set forth in this Subsection.
1205 (g) W
ithdrawal of land use request.
Any appl
icant wishing to withdraw a proposed land use permit prior to final action by the Planning Commission shall file a written request for
withdrawal with the Planning Department
1) If the request for withdrawal is received prior to the publication of notice for the public hearing, the Planning Department shall
withdraw the application administratively without any restriction on the re-filing of a proposed land use permit on the property in
the future.
2) If notice has been published (or is irretrievably set for publication) and the application has not been heard by the Planning
Commission, the application shall remain on the Planning Commission’s public hearing agenda and the withdrawal request shall
be considered for approval or denial, with or without prejudice, by the Planning Commission.
1205 (h) E
ffect of land use approval.
1) Approval of a land use permit shall be in full force and effect upon its approval by the Planning Commission.
2) For a property on which a use, building, structure or other improvements existed in conformity with this Development Standards
Ordinance prior to the effective date of a land use request affecting the property, any such use, building, structure or other
improvements no longer in conformance shall be governed under the Legal Nonconforming Development Article of this
Development Standards Ordinance.
3) Construction of any use, building, structure, or other improvements for which a building permit has been issued in conformity with
this Development Standards Ordinance prior to the effective date of a land use permit affecting the property may continue to
completion and, upon completion, shall be governed under the provisions of the Legal Nonconforming Development Article of thi s
Development Standards Ordinance, as applicable.
1205 (i) C
onditional approval.
In approv
ing a land use request, the Planning Commission may impose conditions of approval which it deems necessary in order to make
the requested action acceptable and consistent with the purposes of this Development Ordinance, to ameliorate negative issues identified
through evaluation of the standards governing consideration of the land use request, or to further the goals and objectives of any County
plans adopted by County Council.
1) Types
of conditions.
By w
ay of example only, such conditions may consist of, but are not exclusive of, any or all of the following:
a. Dedication of required rights-of-way
b. Setback requirements
c. Specified or prohibited locations of buildings, parking, loading, or storage areas.
d. Driveway and access locations
e. Building heights and building size
f. Landscaping
g. Provisions for additional buffering requirements
h. Preservation of existing trees or vegetation
i. Measures to alleviate potential nuisance from light, noise, dust, odor
j. Hours of operation
k. Architectural style
l. Development per submitted sketch plan
2) Such conditions:
12-7
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
a. Shall
only be valid if they are included in the motion approving the land use;
b. Shall be in effect as long as the land use permit is in effect, or for the period of time specified in the motion for
approval of the land use;
c. Shall be required of the property owner and all subsequent owners as a condition of their use of the property;
and
d. Shall be interpreted and continuously enforced by the Planning Department in the same manner as any other
provision of this Development Ordinance.
e. A building permit shall not be issued until after the review and approval by the Planning Department of final
site, architectural, and development plans required by such conditions.
1205 (j) Policy Regarding Planning Commission Review of Modifications to Approved Projects .
In addit
ion to any requirements described elsewhere in this Ordinance, the following circumstances shall necessitate that a project previously
approved by the Planning Commission be brought back to the Planning Commission for review:
a. There is a change of use (in any way introducing in any form or altogether deleting a commercial, institutional, or
residential use from the project).
b. There is an increase in density greater than five percent (5%) of what was approved.
c. There is a decrease in open space by more than five percent (5%) of what was approved.
d. There is an increase in vehicular trip generation by five hundred (500) or more trips regardless of project size.
e. Change in location of access drive (if not approved by County Engineer).
f. Change in location of structures by more than thirty-five (35) feet in any direction.
g. Change in orientation of any structure by an angle greater than forty-five (45) degrees.
h. Change in any specific condition previously stipulated by Commission.
i. Other changes deemed substantive by Planning, Engineering, Stormwater, or Emergency Services
(Sec
tion Amended 4/1/2024)
Sec. 1206 M
inor subdivisions.
Becaus
e a Minor Subdivision, as defined in Articles 4 and 16 of this Ordinance, does not involve any new public road and minimal construction
or installation of improvements it can be reviewed under a much more simplified process than applicable to major subdivisions. A minor
subdivision of land simply requires review by the Planning Department and approval of a record plat, which upon its recording with the
Register of Deeds, actually creates the proposed lots and easements.
Sec. 1207 P
roject approval.
The Pl
anning Department must first approve a preliminary plat for any subdivision or a site plan for development of a multi -family or
nonresidential project prior to the issuance of a development permit or initiation of any land disturbing or construction act ivities.
1207(a) R
esponsibility for project approval.
1) The Pl
anning Department is responsible for administering the re- view and approval process for preliminary subdivision plats and
site plans. The Di - rector shall forward a copy of the project approval application to other appropriate County Departments, the
South Carolina Department of Transportation, or others as appropriate, for their review and comment. The Planning Department
shall provide all comments to the applicant for resolution, who shall work directly with each department as necessary to resolve all
issues.
2) A preliminary plat or site plan may be prepared by a professional engineer, a registered land surveyor, a landscape architect , a
land planner or any other professional familiar with land development and project construction activities. (2/16/10)
12-8
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
1207 (b) P
rocedure for project approval.
1) A pre-appl
ication review with a preliminary sketch plan is suggested. Such sketch plan shall be the plan associated with the land
use approval of the property, if any.
2) An application for project approval may be processed independently or in conjunction with an application for issuance of a
development permit.
3) An application for project approval shall be submitted to the Planning Department. The application shall include:
a. The name and address of the person requesting review.
b. A properly completed application form, as furnished by the Planning Department, requesting review for project approval.
c. The applicant shall submit the preliminary subdivision plat or site plan showing the entire ownership drawn to the
specifications of this Section in a number of copies required by the Planning Department. Submission of all plans in a
digital format acceptable to the Planning Department is required.
d. Payment of the applicable application and review fees as established by the County Council from time to time.
4) The Planning Department will review the application for completeness within five (5) days of submission. Incomplete applicati ons
will be returned to the applicant.
5) If the subdivision includes or abuts a U.S., State numbered highway, or other State roadway, unless all of the lots in the subdivision
contain five (5) acres or more and no new street is involved, review by the South Carolina Department of Transportation ( DOT) is
required. Two additional copies of the final plat must be submitted to the Planning Department for forwarding to DOT. The owner
or sub divider must respond to the recommendations of the DOT prior to project approval by the County.
6) Following review of the application, the Planning Department will indicate on the drawing or in writing all comments related to
compliance with this Development Standards Ordinance.
7) Within sixty (60) days following the review of the application and within sixty (60) days following any subsequent plan revis ions,
the Planning Department shall indicate on the drawings, or in writing, all comments related to compliance with this Development
Code. The Planning Department shall have sole authority to determine the applicability of any provisions of this Development
Standards Ordinance to the submitted plans.
8) The owner is responsible for compliance with all codes and regulations, including all codes and requirements of other departments
and agencies (such as NPDES and Section 404, as applicable) and for the satisfaction of all the noted and written comments.
9) The Planning Department may not approve any preliminary subdivision plat or site plan that shows a lot or situation that woul d
clearly require a variance to order to be reasonably usable, whether due to the presence of flood plain, unusual configuration, lack
of public utilities, or for any other reason.
12-9
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
Char
t 12.1
Maj
or Subdivision Approval Process
12-10
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
Char
t 12.2
Multi-F
amily/Non-Residential Development Approval Process
10) When the
Planning Department has determined that the preliminary subdivision plat or site plan is in compliance with the
requirements, purpose and intent of this Development Standards Ordinance, it will be approved. The Planning Department will
sign and date the CERTIFICATE OF PROJECT APPROVAL stamped or printed on a reproducible copy of the preliminary
subdivision plat or site plan. The requisite number of copies of the approved drawings will be transmitted to the applicant and to
the respective County departments.
11) The Certificate of Project Approval will remain in effect as provided for in Section 1213 of this ordinance.
12-11
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
1207 (c) Gen
eral standards for project approval.
1) The proposed name of the development and proposed street names shall not duplicate or too closely approximate, phonetically,
the name of any other development or street in the County. If shown to the contrary, the Planning Department may refuse to accept
such development or street names.
2) The preliminary plat or site plan shall be prepared on a boundary survey of the entire tract to the subdivided or developed showing
the location of the boundaries and dimensions of the tract to be developed.
3) The preliminary subdivision plat or site plan shall be clearly and legibly drawn at a scale of not less than 100 feet: 1 Inch. The
recommended maximum dimensions of the sheet size is 36 inches by 42 inches and the minimum dimensions of 17 inches by 22
inches; however, the Planning Department may approve other sheet sizes and graphic scales as appropriate.
4) For property over one hundred (100) acres, a smaller scale may be used where, in the judgment of the Planning Department,
presentation of detailed data is not necessary to evaluate the entire project. It is the intent of this provision that in all cases sufficient
information shall be provided for an adequate evaluation of the public and private improvements.
1207 (d) P
reliminary plat or site plan requirements.
Each pr
eliminary plat or site plan shall show the following:
1) Capti
on:
a. Proposed name of the development and its acreage (or square footage if less than an acre).
b. Name, address, telephone and fax numbers of the property owner and subdivider or developer.
c. Name, address, telephone and fax numbers of the applicant.
d. Name, address, telephone and fax numbers of the individual or company responsible for the design. The name,
registration number and seal of the professional under whom the plan was prepared shall be stamped on the plan and
signed.
e. Date of survey, north point and graphic scale, source of datum, date of plan drawing, and revision dates, as appropriate.
2) Proposed use of the property, including a statistical summary of development factors such as density, nonresidential floor ar ea,
number of lots or dwelling units, and minimum unit sizes, as may be pertinent to the type of project.
3) Location (Tax Map Number) and size of the property in acres (or in square feet if less than an acre).
4) Location map of the property in relation to the surrounding area with regard to well known landmarks such as arterial streets ,
railroads or others. Sketches may be drawn in freehand and at a scale sufficient to show clearly the information required, but no t
less than 1 inch equal to 2,000 feet. U.S. Geological Survey maps may be used as a reference guide for the location sketch.
5) Land use permit application number, date of approval, and stipulations (conditions of approval), as applicable.
6) Variances obtained on the property by application number, date of approval, and stipulations (conditions of approval), as applicable.
7) Recorded deed names of adjoining property owners or subdivisions.
8) Natural features within the property, including:
a. All rivers and perennial streams, lakes, ponds and other state waters located on the property.
b. On all water courses entering or leaving the property.
c. Delineated wetlands and delineated flood hazard areas noting the base flood elevation (BFE)
9) Man- made features within and adjacent to the property, including street right -of-way and pavement widths, names of existing
streets, all easements, city and county political boundary lines, and other significant information such as location and dimensions
of bridges, utility lines, existing buildings to remain, and other features
10) The proposed project layout including:
a. For subdivisions, lot lines and street right -of-way lines, with proposed street names and right -of-way widths, along with
the front building setback and land to be reserved for public uses.
b. For multi-family and nonresidential development site plans, the outline and location of all buildings, and the location of
all minimum building setback lines, outdoor storage areas, buffers, parking areas, driveways, curb cuts, and designated
fire lanes.
11) The proposed phasing of the development if it is proposed to be built in sections.
12-12
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
12) Topographi
c contours with a minimum vertical interval of five feet shall be provided for both existing and proposed topography.
13) A statement as to the source of domestic water supply.
14) A statement as to the provision for sanitary sewage disposal.
15) The approximate location of proposed storm water detention facilities.
16) Such additional information as may be reasonably required to permit an adequate evaluation of the development activity proposed
in the application.
1207 (e) En
gineer and owner certifications.
Each pr
eliminary plat or site plan is to include a certification by the engineer (if applicable) and by the owner that read as shown on Figure
12.1 and are signed in blue ink on the original drawing.
1207 (f) E
vidence of project approval.
Each pr
eliminary subdivision plat or site plan shall carry the following certificate printed or stamped on the plat. Certificate of Project Approval,
to read as shown on Figure 12.2.
Fig
ure 12.1 Figure 12.2
12-13
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
Sec. 1208 D
evelopment plans.
1208 (a) Gen
eral requirements.
1) Persons seeking to undertake a development activity (as defined in this Development Ordinance) shall not commence or proceed
until development plans are ap- proved and a development permit is issued by the Planning Department The process for approval
of a development permit is presented in the Development Permit Section, below.
2) The development plans for a project shall conform in all respects with the requirements of this Development Ordinance or other
separate ordinances, and shall include each of the plans in this Section as appropriate to the project. These include:
a. Erosion and sedimentation control plan;
b. Storm water Management Plan;
c. Street Improvement Plan;
d. Buffer Plans; and,
e. Public Utility Plans.
i. All development plans and supporting studies shall be prepared by or under the supervision of a professional
engineer registered in the State, except that the Buffer plans may be prepared by or under the supervision of
a landscape architect registered in the State.
ii. All development plans for a project shall be submitted in hard copy format in a number of copies as required
by the Planning Department and in digital form in a format acceptable by the Planning Department.
1208 (b) E
rosion and sedimentation control plan.
Eros
ion and sedimentation control plans must be prepared to meet the erosion and sedimentation control requirements of the Pickens County
Stormwater ordinance, No. 392, as amended. All plans, specifications, and calculations related to erosion and sedimentation control
submitted to Pickens County shall be prepared and sealed by a registered Professional Engineer or by a Tier B Surveyor. Review and
approval of all erosion and sedimentation control plans is carried out through the office of the County Stormwater Manager. All plans and
associated fees required by this noted office are to be submitted to the Planning Department for distribution.
1208 (c) St
ormwater management plan.
Stor
mwater management plans must be prepared to meet the storm water management requirements of the Pickens County Stormwater
ordinance, No. 392, as amended. All plans, specifications, and calculations related to stormwater management submitted to Pickens County
shall be prepared and sealed by a registered Professional Engineer or by a Tier B Surveyor. Review and approval of all storm water plans
is carried out through the office of the county Stormwater manager. All plans and associated fees required by this noted office are to be
submitted to the Planning Department for distribution.
1208 (d) S
treet improvement plan.
1) All plans, specifications, and calculations of roadway construction submitted to Pickens County shall be prepared and sealed by a
registered Professional Engineer or by a Tier B Surveyor.
2) Center line profiles and typical street sections of all proposed streets shall be required. Profiles shall be drawn on standard plan
and profile sheet with plan section showing street layout, pavement and right -of-way width, curvature, and required drainage
facilities. Typical street sections shall be provided for street widening.
3) Where sanitary sewer or storm water sewers are to be installed within a street, the grade, size, location and bedding class of pipe,
and the location and invert elevation of manholes shall be indicated on the road profile.
4) Center line profiles covering streets that are extensions of existing streets shall include elevations at 50 foot intervals f or such
distance as may be adequate to provide continuity consistent with the standards required by this Development Standards
Ordinance for street improvements, but no less than 200 feet.
5) All plan elevations shall be coordinated and sited into U.S. Coast and Geodetic Survey or other approved bench marks where
feasible or into reference monuments established by the Department of Homeland Security.
6) A street striping plan, showing striping in accordance with the Manual on Uniform Traffic Control Devices, latest edition as published
by the Federal Highway Administration, shall be prepared for any street newly constructed or widened to four (4) or more lanes.
12-14
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
1208 (e) Bu
ffer plans.
All
buffers as required by this Code shall be illustrated on plans as described in this Subsection. The plans may be consolidated as one plan
if the information can be clearly shown.
1) Buffer plan.
A buffer plan shall be prepared for any natural or structural buffer required in accordance with the specifications and standards
contained in this Development Code. The buffer plan shall show:
a. Scale at 1 inch = 20- feet to 50-feet, as needed to clearly show illustrate the proposed plantings. Multiple sheets keyed
to an index sheet may be used.
b. Caption:
i. The name of the development and its acreage (or square footage if less than an acre).
ii. Name, address, telephone and fax numbers of the property owner and subdivider or developer.
iii. Name, address, telephone and fax numbers of the applicant.
iv. Name, address, telephone and fax numbers of the individual or company responsible for the design. The name,
registration number and seal of the professional under whom the plan was prepared shall be stamped on the
plan and signed.
v. Date of survey, north point and graphic scale, source of datum, date of plan drawing, and revision dates, as
appropriate.
c. The boundaries of each required buffer area.
d. The location and size of all underground or aboveground utilities on the site, including the limits of any public or private
utility easements and storm water detention areas.
e. For each natural buffer, the plan must show:
i. Methods to be employed to protect the critical root zones of the trees in the buffer from disturbance during
construction, including fencing details, erosion control, signage, etc.
ii. Proposed supplemental plantings required to maintain the opaque visual screen required.
f. For each structural buffer, the plan must show:
i. All
grading and construction details for earthen berms, walls and fences that are proposed as part of the visual
screen.
ii. A planting plan showing the location, size and type of proposed plant materials.
iii. The location, size and common name of all existing plant materials to be retained that contribute to meeting
the minimum requirements of this Code for buffers.
iv. Typical cross-sections of the buffer illustrating the improvements proposed and typical location of vegetation.
At least one cross-section shall be provided for each buffer.
1208 (f) P
ublic utility plans.
1) Domes
tic water supply plan (copy).
a. If connection to a public water system is proposed or required, the domestic water supply plan shall depict all water
system improvements, water mains, fire hydrants, valves and other appurtenances, and other information as may be
required by the providing water jurisdiction.
b. The Planning Department is not responsible for ensuring compliance with the respective water service provider
requirements or specifications. The project developer and/or property owner must ensure the applicable plans have
been submitted to the respective authority and have received the proper approvals.
2) Sewage disposal plan (copy).
a. If a connection to a public system is proposed, Sewage disposal plans are to include: Sanitary sewerage plans, including
profiles of all mains and outfalls, lift station and force main details, typical manhole construction details, and other
information as may be required by the providing sanitary sewer jurisdiction.
12-15
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
b. The P l
anning Department is not responsible for ensuring compliance with the respective sewer service provider
requirements or specifications. The project developer and/or property owner must ensure the applicable plans have been
submitted to the respective authority and have received the proper approvals.
c. For projects approved to be served by on-site sewage disposal systems, location of septic tank, extent of drain field and
attendant structures, location and results of percolation tests, and other information shall be shown as required by the
Department of Health and Environmental Control (DHEC).
Sec. 1209 D
evelopment permit.
1209 (a) Resp
onsibility for development actions.
1) No pers
on shall conduct any land- disturbing activity, including grading, clearing and grubbing, tree clearance, land development
or project construction without first obtaining a stormwater permit and/or a development permit from the Planning Department to
perform such activity.
2) Any person proposing development shall first submit to the Planning Department an application for a development permit, including
all civil de- sign and construction drawings required by this Development Ordinance. The application must be authorized by the
property owner; however, the operator is the only party who may obtain a permit.
3) The Planning Department is responsible for administering the review and approval process for issuance of development permits.
The Planning Department shall forward a copy of the development permit application, including the civil design and constructi ons
drawings for the project, to County departments, the South Carolina Department of Transportation or others as appropriate, for
their review and comment. The Planning Department shall provide all comments to the applicant for resolution, and shall issue the
development permit when all requirements of this Development Ordinance are met.
4) Approval of plans by the Planning Department shall not imply or transfer acceptance of responsibility for the application of the
principles of engineering, architecture, landscape architecture or any other profession, from the professional, corporation or
individual under whose hand or supervision the plans were prepared.
5) The completion of inspections and authorization for work continuation shall not transfer responsibility for the quality of the work
performed or materials used from the owner, nor imply or transfer acceptance of responsibility for project design or engineering
from the professional, corporation or individual under whose hand or supervision the plans were prepared.
6) No development permit shall be interpreted to relieve any owner of the responsibility of maintaining full compliance with all
applicable codes, ordinances and other regulations. Any development permit issued in error or in contradiction to the provisions of
this Development Ordinance shall be considered to have been null and void upon its issuance.
7) Liability.
a. The approval of an erosion and sedimentation control plan, stormwater plan or other plans under the provisions of this
Development Ordinance, the issuance of a development permit, or the compliance with any other provisions of this
Development Ordinance shall not relieve any person from the responsibility for damage to any person or property
otherwise imposed by law nor impose any liability upon the County Council for damage to any person or property.
b. The fact that any activity for which a development permit has been issued results in injury to the property of another shall
neither constitute proof of, nor create a presumption of, a violation of the standards provided for in this Development
Ordinance or the terms of the development permit.
1209 (b) D
evelopment activities authorized.
A devel
opment permit shall be issued to authorize all activities associated with development activity regulated by this Ordinance, including,
but not limited to, clearing and grubbing, grading and the construction of such improvements as streets, surface parking areas and drives,
storm water drainage facilities, sidewalks, or other structures permanently placed on or in the property except for buildings, signs, or other
structures requiring the issuance of a building permit.
1209 (c) Pr
ocess for approval of development permit.
1) An application for a development permit may proceed simultaneously with an application for a preliminary subdivision plat or site
plan, but may not be issued prior to project approval of such plat or plan by the Planning Department .
2) The application for a development permit shall be submitted to the Planning Department and must include the following:
12-16
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
a. Appli
cation on the form furnished by the Planning Department, requesting review for issuance of a development permit.
b. The following plans shall be submitted in a number of copies required by the Planning Department:
i. The preliminary plat or site plan requesting or reflecting project approval by the Planning Department
ii. The civil design and construction drawings prepared in conformance with the specifications and standards in
this Development Ordinance.
c. Payment of any development permit fee, as established from time to time by the County Council.
i. The application will be checked for completeness within five (5) days of its submission.
3) Incomplete applications will be returned to the applicant.
4) The applicant may be required by the Planning Department to secure development approval from other agencies if they are affected
by the development. Development approval may be required from but not limited to:
a. Stormwater Manager
b. County Engineer
c. Local Fire Official
d. DHEC
e. Soil and Water Conservation District
f. South Carolina Department of Transportation
g. South Carolina Department of Natural Resources
h. US Army Corps of Engineers
i. US Environmental Protection Agency
5) Upon receipt of comments from other departments and agencies, the Planning Department will indicate on a copy of the civil design
and construction drawings or in writing all comments related to compliance with this Development Ordinance, conditions of land
use approval, and other regulations or ordinances, as appropriate.
6) The Planning Department will forward its comments to the applicant.
7) Within sixty (60) days following the review of the application and within 60 days following any subsequent plan revisions, the
Planning Department shall indicate on the drawings, or in writing, all comments related to compliance with this Development Code.
The Planning Department shall have sole authority to determine the applicability of any provisions of this Development Standards
Ordinance to the submitted plans.
8) The applicant will be responsible for compliance with all codes and regulations and for the satisfaction of all of the comments
received. The owner will also be responsible for obtaining approval from all other agencies affected by the project.
1209 (d) I
ssuance of development permit.
1) Foll
owing satisfaction of all comments, receipt of approvals from all affected agencies and receipt of all required bonds, th e
Planning Department shall issue a development permit authorizing development activity to begin based on the approved civil
design and construction drawings.
2) No development permit shall be issued unless the erosion and sedimentation control plan and stormwater plan has been approved,
project approval has been granted by the Planning Department, and the Planning Department has affirmatively determined that
the plan is in compliance with all requirements of this Development Ordinance. If the development permit is denied, the reason for
denial shall be furnished to the applicant.
3) If the tract is to be developed in phases, then a separate development permit shall be required for each phase.
4) The development permit may be suspended, revoked or modified, as to all or any portion of the land affected by the plan, upon
finding that the holder or his successor in title is not in compliance with the approved erosion and sedimentation control plan or
that the holder or his successor in title is in violation of this Development Ordinance. A holder of a development permit shall notify
any successor in title as to all or any portion of the land affected by the approved plan or the conditions contained in the
development permit.
1209 (e) Ex
piration of development permit.
Expi
ration of an issued development permit shall be guided by the requirements as set forth in Section 1213 of this ordinance.
12-17
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
Sec. 1210 Fl
ood area development permit and certification requirements.
1210 (a) Flood a
rea permit required.
If dev
elopment or construction is proposed within or affecting an area of special flood hazard, approval of a flood area permit application
shall be required. An application for a flood area permit may be included with and reviewed along with a development permit application.
1210 (b) A
pplication process for a flood area development permit.
1) Application for a flood area permit shall be made to the Planning Department on forms furnished by them prior to any development
activities.
2) The application for a flood area permit is to include the following:
a. Plans in duplicate drawn to scale showing the nature, location, dimensions, and elevations of the area in question.
b. Location of existing or proposed structures, fill, storage of materials and drainage facilities.
c. A plot plan that shows the 100- year floodplain contour or a statement that the entire lot is within the floodplain must be
provided by the development permit applicant when the lot is within or appears to be within the floodplain that is mapped
by the Federal Emergency Management Agency or the floodplain identified pursuant to either Section 1105(i)(2)k or
Section 1105(j)(2)m and Section 1105(j)(3). The plot plan must be prepared by or under the direct supervision of a
registered land surveyor or professional engineer and certified by same.
d. A plot plan that shows the floodway, if any, as identified by FEMA or the floodway identified pursuant to either
Section 1105(i)(2)k or Section 1105(j)(2)m and Section 1105(j)(3). The plot plan must be prepared by or under the
direct supervision of a registered land surveyor or professional engineer and certified by same.
e. Where base flood elevation data is provided:
i. Elevation in relation to mean sea level of the proposed lowest floor of all new and substantially improved
structures, and
ii. Elevation in relation to mean sea level to which any nonresidential building will be flood proofed.
f. Where base flood elevation data is not provided, then the provisions of Section 1105(j)(3) must be met.
g. Where any watercourse will be altered or relocated as a result of proposed development, the application for a
development permit shall include:
i. A description of the extent of watercourse alteration or relocation.
ii. An engineering report on the effects of the proposed project on the flood- carrying capacity of the watercourse
and the effects to properties located both upstream and downstream.
iii. A map showing the location of the proposed watercourse alteration or relocation.
3) Certifications
a. Floodproofing Certification – When a structure is floodproofed, the applicant shall provide certification from a registered,
professional engineer or architect that the non- residential, floodproofed structure meets the floodproofing criteria in the
non-residential construction requirements of Section 1105(j)(2)b.
b. Certification During Construction – A lowest floor elevation or floodproofing certification is required after the lowest floor
is completed. As soon as possible after completion of the lowest floor and before any further vertical construction
commences, or floodproofing by whatever construction means, whichever is applicable, it shall be the duty of the permit
holder to submit to the Building Official a certification of the elevation of the lowest floor, or floodproofed elevation,
whichever is applicable, as built, in relation to mean sea level. Said certification shall be prepared by or under the direct
supervision of a registered land surveyor or professional engineer and certified by same. Any work done prior to
submission of the certification shall be at the permit holder’s risk. The Building Official shall review the floor elevation
survey data submitted. The permit holder immediately and prior to further progressive work being permitted to proceed
shall correct deficiencies detected by such review. Failure to submit the survey or failure to make said corrections
required hereby shall cause the issuance of a stop work order for the project.
c. V- zone C
ertification – When a structure is located in Zones V, VE, or V1- 30, certification shall be provided from a
registered professional engineer or architect, separate from submitted plans, that new construction or substantial
improvement meets the criteria for the coastal high hazard areas outlined in Section 1105(j)(6).
12-18
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
d. As-built
Certification – Upon completion of the development, a registered professional engineer, land surveyor, or
architect, in accordance with South Carolina Law, shall certify according to the requirements of Section 1210(b)(3) that
the development is built in accordance with the submitted plans and previous pre- development certifications.
Sec. 1211 D
riveway permit.
1211 (a) Dr
iveway permit; when required.
1) No dri
veway connecting to a public street or a public right-of-way or public property shall be installed without first having approval
from the Roads and Bridges Department. If the driveway connects to a State or U.S. numbered highway, approval of the Sout h
Carolina Dept. of Transportation shall be required prior to County approval.
2) Appli
cations may be made to the Planning Department
Sec. 1212 Fi
nal subdivision plat.
1212 (a) Re
sponsibility.
1) The Planning Department shall be responsible for coordination of the approval process for all final subdivision plats.
2) The final subdivision plat shall be certified and sealed by a registered land surveyor.
3) The owner is responsible for compliance with all requirements of this Development Standards Ordinance. Approval of a final
subdivision plat and acceptance of the public improvements and dedications therein shall not relieve the owner of this responsibility.
1212 (b) P
rocedures for final plat approval.
1) Prior to submission of an application for final subdivision plat approval, either:
a. All public improvements shall have been properly installed and completed in accordance with all requirements and
standards of this Development Standards Ordinance and as-built surveys of the improvements shall have been approved
by the County Engineer as required in the Land Development Activities Article of this Ordinance; or,
b. Partial improvements shall have been completed as specified in Table 10.1 approved by the County Engineer as provided
under the Land Development Standards Article of this Development Ordinance.
2) An application for a final subdivision plat approval shall be made to the Planning Department The application shall include:
a. The name and address of the person to whom the notice of approval shall be sent.
b. A properly completed application form, as furnished by the Planning Department, requesting final subdivision plat review.
c. The final subdivision plat drawing prepared in conformance with the specifications in this Section, the original of which
shall be a print or tracing, signed and sealed with the surveyor’s impression seal, in a number of copies required by the
Planning Department. (2/16/10)
d. The as-built surveys of the improvements as required in the Land Development Activities Article of this Ordinance if the
surveys have not been previously received and approved.
e. Payment of all applicable final subdivision plat filing and recording fees, as established by the County Council from time
to time.
f. Executed deeds for the dedication of all street rights-of-way, easements and other public properties.
g. A maintenance surety. (2/16/10)
The 25% maintenance surety shall guarantee normal maintenance of the installed infrastructure. This surety will cover
materials, workmanship, and structural integrity until such time as Pickens County accepts and maintains the road. This
surety shall run for a minimum of one year from the date of final paving or final plat approval, whichever comes later, and
approval of the County Engineer. (2/16/10)
h. When the subdivision is served by public water, a Final Approval to Place Into Operation certification shall be provided
from the Department of Health and Environmental Control certifying that the infrastructure placed with the subdivision is
approved for use.
12-19
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
i. When the s
ubdivision is served by public sewerage a Final Approval to Place Into Operation certification shall be provided
from the Department of Health and Environmental Control certifying that the infrastructure placed with the subdivision is
approved for use.
j. Where i
ndividual septic waste disposal is proposed, a letter of final subdivision approval shall be submitted from the
appropriate division of the Department of Health and Environmental Control identifying each lot for which individual waste
disposal is approved. Areas or lots not so approved shall not be included on the final plat unless restricted to prohibit
construction of any structure thereon by such notation as ―reserved exclusively for open space, etc.
3) The Planning Department shall review the application for completeness at the time of submission. Incomplete applications will be
returned to the applicant.
4) Within 2 weeks following receipt of the application, the Planning Department shall indicate on the drawing or in writing all comments
related to compliance with this Development Code. The Planning Department shall have sole authority to determine the applicability
of any provisions of this Development Standards Ordinance to the final plat.
5) The owner shall be responsible for compliance with all codes and regulations and for the satisfaction of all the noted and wr itten
comments of the Planning Department Resubmission of all revised drawings shall be made to the Planning Department
6) When all of the requirements of this Development Ordinance, and any conditions of land use approval, have been met, the Planning
Department shall sign and date the CERTIFICATE OF FINAL PLAT APPROVAL stamped or printed on all submitted originals of
the final subdivision plat. (2/16/10)
7) Once the final subdivision plat has been so certified, it shall be recorded by the applicant with the Register of Deeds.
8) The Planning Department will forward the executed deeds for the streets, easements and dedication of other public properties, if
applicable, to the County Council for approval and recording.
9) Subsequent to the recording of the final plat, one additional hard copy with all certificates endorsed thereon shall be filed with the
records of the Planning Department The Map book, volume and page numbers where the plat is recorded shall also be indicat ed
on the copy.
1212 (c) Gen
eral standards for final plats.
1) The final subdivision plat shall be drawn on an appropriate material and sheet size, and using minimum line weights and letter
heights as required by South Carolina law for the recordation of maps and plats and as acceptable to the Register of Deeds.
2) The final subdivision plat shall substantially conform to the preliminary subdivision plat and may constitute only that portion of the
approved preliminary subdivision plat that the owner proposes to record at any one time, provided that such portion conforms to
the requirements of this Development Ordinance.
1212 (d) F
inal plat requirements.
The fi
nal subdivision plat shall contain all caption information and plat data required by South Carolina law pertaining to the recordation of
maps or plats as well as the additional information required in this Subsection.
1) Capti
on.
The maps or plats shall have a title or name, including the name of the subdivision, which shall be contained in the caption and
the caption shall also provide the following information:
a. The St
ate, county, and township, and subdivision, if the property lies within a particular subdivision;
b. Tax map number of the original parcel(s);
c. The date of plat preparation;
d. The scale, stated and shown graphically;
e. The name, address, telephone number, and registration number of the land surveyor; and (2/16/10)
f. All reproductions of original maps or plats shall bear the original signature, in black ink, of the registrant placed across
the registration seal in order to be a valid or recordable map or plat.
2) Plat data.
Maps or plats shall be made in a professional manner and in accordance with the standards listed in the Standards of Practice
Manual for Surveying in South Carolina and shall show the following information, as specified: (2/16/10)
12-20
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
a. All maps or plats shall show the direction and distance from a point of reference to a point on the boundary of the
individual survey, and such additional data as may be required to relocate the boundary point from the point of reference
with the same degree of accuracy required of the parcel surveyed. The point of reference shall be an established,
monumented position which can be identified or relocated from maps, plats, or other documents on public record;
b. All maps or plats of boundary surveys or subdivision surveys shall show bearings of all lines of the boundary or lot lines,
and distances of all boundary or lot lines, and area of the parcels expressed in acres or square feet;
c. All maps or plats shall show the width and the former widths, if pertinent, of all rights of way adjacent to or crossing the
property or adjacent to any point of reference;
d. All maps or plats shall show easements and apparent encroachments, if pertinent;
e. In the case of curved lines, the curve shall be defined by curve data to include the radius, arc length, chord bearing, and
distance for regular curves. Chord distances and directions shall be given for irregular curves;
f. All corner markers and markers of pertinent reference points shall be fully described and indicated as to their material or
types and shall be constructed of a permanent material such as iron, steel, concrete, or stone, as required for survey
monuments under the Project Design Standards Article of this Code;
g. An arrow shall be shown on the map or plat and shall be accurately correlated with the courses so that it is accurately
positioned and designated as astronomic, grid, or magnetic; (2/16/10)
h. All linear distances shown on maps or plats shall be horizontal;
i. All angular directions shown on maps or plats shall be represented in degrees and minutes. Where plats state or surveys
require accuracy in excess of 1 in 5,000, the angular directions shall be represented in degrees, minutes, and seconds.
All angular directions shall be referenced to the principal meridian; and
j. All maps or plats shall show the appropriate coordinates of at least two permanent monuments thereon, when a published
control monument is within 2,000 feet of any point on the property mapped or platted, or any point of reference shown
thereon. (2/16/10)
3) Additional data.
The fol
lowing is to be shown on the final plat in addition to the caption information and plat data required by South Carolina law:
a. Street names including both the name and the suffix, such as street, avenue, etc.;
b. Name of the former subdivision if any or all of the property has been previously subdivided;
c. Names of owners of record of all adjoining land;
d. Location sketch;
e. Lot lines with dimensions to the 1/100 (0.01) foot, necessary internal angles, arcs, and chords and tangent or radii of
rounded corners;
f. Building front setback lines with dimensions as to length across each lot and distance from the street right -of-way;
g. Lots or sites numbered in numerical order and blocks lettered alphabetically;
h. Location, dimensions and purpose of all easements, including slope easements, if required, and any areas to be
reserved, donated, or dedicated to public use;
i. Cemeteries and burial grounds located within the premises surveyed; (2/16/10)
j. The extent of any area of special flood hazard, as defined in this Development Ordinance; and
4) Curve data shall be required for all roadway centerline curves of greater than ten degrees on new roads. Centerline data including
the radius, central angle, arc length, chord bearing and distance, and tangent distance between curves must be given for regular
curves. Chord distances and directions shall be given for irregular curves on pre- existing roads.
1212 (e) Su
rveyor and owner certificates.
Each f
inal subdivision plat shall carry the following certificates printed or stamped on the plat to read as shown on Figure 12.4. The original
certificates on the reproducible copy of the final plat shall be signed and dated.
1) Surveyor’s Certificate.
12-21
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
2) Surv
eyor’s Seal. The reproducible final subdivision plat drawing shall bear the original signature, in black ink, of the registered land
surveyor placed across the surveyor’s seal in order to be valid and recordable.
3) Owner’s Certificate.
1212 (f) S
tatement of private covenants.
A statement of the private covenants, if they are brief enough to be put directly on the plat; otherwise, a statement as foll ows: This plat is
subject to the covenants set forth in the separate document(s) attached hereto dated , which hereby becomes part of this plat.
1212 (g) C
ertificate of final subdivision plat approval.
The cer
tificate of final plat approval shall be stamped or printed on the final subdivision plat for execution upon its approval by the Planning
Department as shown in Figure 12.5.
12-22
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
1212 (h) C
reation of homeowner’s association.
If r
equired by provisions of this Development Ordinance, a homeowners’ association shall be created and the instruments of such creation
and financial endowment shall be recorded at the time of final plat recording. A copy of the recorded instruments shall be filed with the
Planning Department.
1212 (i) A
cceptance of public improvements.
1) If construction of any required public improvements was deferred at the time of final plat approval, said work must be completed
to the satisfaction of the County Engineer.
2) The developer initially shall obtain a maintenance bond or other surety per the requirements of Section 1102(e) for a one- year
period commencing on the date of final plat recordation; an additional one-year bond or other surety shall be obtained commencing
on the date of completion of any improvements deferred at the time of final plat recordation.
3) Prior to expiration of the maintenance period, a final acceptance inspection of the public improvements shall be conducted by the
County Engineer.
4) The owner must correct all defects or deficiencies in materials or workmanship and make such repairs as necessary to approximate
the as-built condition of the improvements.
5) Upon certification by the County Engineer that the public improvements depicted on the as -built surveys are in conformance with
the specifications of this Development Ordinance and are in good repair, the County Engineer shall recommend the release the
maintenance bond and recommend to the County Council that all public improvements be accepted into perpetual maintenance.
a. Roadways for multiple phase subdivisions shall not be considered for acceptance into the County maintenance system
until such time when no further roadway construction leading from such roads will take place.
Sec. 1213 P
roject approvals and establishment of vested rights.
1213 (a) Sit
e-specific subdivision plans.
1) A ves
ted right is established for two years upon the final approval of a site- specific subdivision plan. Such vested right shall
receive five one-year extensions upon proper application by the landowner in each year that an extension desired. The applic ant
shall have two years from the date the plat or plan is approved and stamped by the planning staff to record the plat at the Pickens
County Register of Deeds Office.
2) A vested right in a site-specific subdivision plan shall not attach until all plans have been received, approved, and all fees are paid
in accordance with the Pickens County Unified Development Standards Ordinance and all other applicable ordinances.
3) All phases of phased subdivision plans remain subject to review and approval prior to the subject phase of the project being vested.
4) The Board of Appeals does not have the authority to grant a vested right and no such right shall accrue as a result of their decisions.
1213 (b) N
on-residential site-specific development plans
1) A ves
ted right is established for two years upon the final approval of a site- specific development plan. Such vested right shall
receive five one- year extensions upon proper application by the landowner in each year that an extension is desired unless an
amendment to the Pickens County Unified Development Standards Ordinance has been adopted that prohibits approval. The
applicant shall have two years from when the site plan is approved by planning staff to submit a complete building permit application
or, if no building permit is required, to obtain a Certificate of Site Compliance.
2) A vested right to a site-specific development plan or phased development plan shall not attach until all plans have been received
and approved and all fees are paid.
3) A vested right to a site-specific development plan or phased development plan is subject to revocation by the local governing body
upon its determination, after notice and public hearing, that there was a material misrepresentation by the landowner or substantial
noncompliance with the terms and conditions of the original or amended approval.
4) All phases of phased development plans remain subject to review and approval prior to any portion of the project being vested.
5) A vested site -specific development plan or vested phased development plan is subject to later local governmental overlay
development standards that impose site plan-related requirements.
6) The Board of Appeals does not have the authority to grant a vested right and no such right shall accrue as a result of their decisions.
12-23
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
7) In the c
ase of projects where more than one building is to be built, the applicant may submit a series of building permit applications.
The first application must be submitted within two years from the date the development plan approval is granted. Each subsequent
application must be submitted within 180 days from the date of issuance of a Certificate of Site Completion or Certificate of
Occupancy for the previous building, whichever shall occur first. The lapse of more than 180 days shall cause the expiration of
the development plan approval.
Sec. 1214 B
uilding permitting.
This
section is provided for reference only. The requirements and procedures contained in this section may be altered or modified by the
Building Official at any time when deemed necessary. Contact must be made of the Building Codes Department for verification of the
appropriate requirements.
1214 (a) Pr
ocedures to obtain a building permit.
A buil
ding permit issued by the Building Official is required in advance of the initiation of construction, erection, moving or alteration of any
building or structure in accordance the provisions of the building code. No building permit shall be issued and no building shall be erected
on any lot in the county unless access has been established in accordance with this Development Standards Ordinance. No building permits
shall be issued before approval of the final plat. All structures shall comply with the requirements of this Development Ordinance, whether
or not a building permit is required.
1) For any structure served by an on- site sewage disposal system, a permit issued by the Department of Health and Environmental
Control (DHEC) shall be required prior to issuance of a Building permit. Said permit may first require approval by DHEC of a plan
showing the location of the sewage disposal system and other on-site improvements, in accordance with their regulations.
2) Procedure for approval.
The Building Official is responsible for administering and enforcing the building codes of the County.
a. Prior to issuance of a building permit the owner shall have received a development permit if required by this Development
Ordinance.
b. Application for a building permit shall be made to the Building Inspector. The application shall include:
1. Application on the form furnished by the Building Inspector, requesting issuance of a building permit.
2. The application shall include such other information as lawfully may be required by the Building
Inspector, including existing or proposed building or alteration; existing or proposed uses of the
building and land; the number of families, housekeeping units, or rental units the building is designed
to accommodate; conditions existing on the lot; and such other matters as may be necessary to
determine conformance with, and provide for the enforcement of this Ordinance.
3. For principal multi-family or non-residential buildings prepared in conformance with this Development
Ordinance and the applicable building codes, plans shall be prepared by or under the supervision of
an architect registered in the State of South Carolina, who shall sign and seal each sheet in the
original set of drawings.
4. DHEC Approval if an on-site sewage disposal system has been allowed
5. Payment of the building permit application and review fees.
6. For applications to move a house, structure or building, the following additional information is
required:
a. The name of the person performing the moving;
b. The origin and destination of the moving;
c. The names of the owners of the property from which the house is removed and of the
property to which it is moved;
d. A detailed outline of the route to be followed and the equipment to be used; and
e. An estimate of the time involved, including the time of the day when said operation shall
be conducted.
f. Any application for a permit must be made at least forty -eight (48) hours prior to the
proposed moving.
12-24
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
g. The Count
y Sheriff’s Department shall furnish a police escort if deemed necessary
c. The application will be checked by the Building Inspector for completeness. Incomplete applications will be returned to
the applicant.
d. Within two (2) weeks following receipt of a complete application, The Building Inspector shall indicate on the building
plans approval or disapproval and attest to same by his signature. One copy shall be returned to the applicant and the
original copy shall be retained by the Building Inspector.
e. The owner shall be responsible for compliance with this Development Ordinance and all building code requirements,
regulations, and for the satisfaction of all of the comments of the Building Inspector.
f. At such time as the owner has addressed the comments to the satisfaction of the Building Inspector and the State Fire
Marshal (if required), a building permit will be issued for the structure.
g. Plumbing, electrical and mechanical permits shall be issued separately by the Building Inspector or separately identified
on the building permit. Such permits must be issued prior to commencement of work by each affected trade.
3) If the work authorized by a building permit has not begun within 1 year from the date of issuance the permit shall expire, unless it
is renewed under the provisions of the building code.
4) Standards for approval.
a. Building permits shall be issued only on buildable lots of record, as defined in this Development Ordinance.
b. Building permits shall be issued in conformance with the adopted technical codes and supplements that constitute the
County’s building code. Conformance to this Development Ordinance is also required as a prerequisite to issuance of a
building permit.
1214 (b) B
uilding inspection.
1) Schedul
ing a building inspection.
Inspections shall be scheduled with the Building Inspector at least twenty-four (24) hours before the inspection is needed. Requests
for inspection should include the street address, lot number, building permit number, and type of inspection.
2) Requir
ed inspections:
a. Foundation. Verify minimum required building setbacks, footing, trenches dug and reinforcing steel in place.
b. Slab plumbing. Water supply line and sewer lateral in slab foundation.
c. Slab Cover. Verify interior footings, gravel, vapor barrier, waterproofing where applicable.
d. Interior walls may not be covered until the following inspections are completed:
1. Framing. Structure at dry-in.
2. Electrical. Rough-in with neutral, ground, and service cable wired.
3. Mechanical. Rough-in complete with pressure test on gas lines.
4. Plumbing. Rough-in complete with pressure test on distribution lines.
e. Insulation. Air sealing, fire caulking, and energy conservation measures installed.
f. Permanent Power (Pre-final). All electrical applications installed and ready to be energized.
g. Final Inspection. Building is complete and ready to occupy.
1214 (c) Cons
truction in flood hazard area.
Construction of a structure within a flood hazard area for which a permit has been issued shall be governed by the following:
1) Upon placement of the lowest floor, or floodproofing by whatever construction means, or upon placement of the horizontal structural
members of the lowest floor, whichever is applicable, it shall be the duty of the permit holder to submit to the Building Inspector a
certification of the elevation of the lowest floor, floodproofed elevation, or the elevation of the lowest portion of the horizontal
structural members of the lowest floor, whichever is applicable, as built, in relation to mean sea level.
2) Certification shall be prepared by or under the direct supervision of a registered land surveyor or professional engineer and certified
by such registered land surveyor or professional engineer. When floodproofing is utilized for a particular building, the certification
12-25
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
shall
be prepared by or under the direct supervision of a professional engineer or architect and certified by the professional engineer
or architect.
3) Any work undertaken prior to submission of the certification shall be at the development permit holder’s risk.
4) The Building Inspector shall review the floor elevation survey data submitted. Deficiencies detected by such review shall be
corrected by the development permit holder immediately and prior to further progressive work being permitted to proceed. Fail ure
to submit the survey or failure to make the corrections shall be cause to issue a stop- work order for the project.
1214 (d) C
ertificate of occupancy.
1) A Certificate of Occupancy must be issued prior to the occupancy or use of any new or newly renovated building or structure, in
accordance with the Procedures and Permits Article of this Development Ordinance.
2) It is unlawful to use or occupy or permit the use or occupancy of any part of a building, structure, or premises, until a cer tificate of
occupancy has been issued stating that the building or structure or premises conforms to the requirements of the building codes
and this Development Ordinance.
3) A certificate of occupancy shall be required for any of the following:
a. Occupancy and use of a building or structure constructed or enlarged.
b. Change in use of existing buildings to uses of a different classification.
c. Any change in use of a nonconforming use, lot or building.
4) Permanent electric power may not be supplied to any structure until the power company is contacted by the Building Codes
Department.
5) A record of all certificates of occupancy shall be maintained by the Building Official and a copy shall be furnished upon request to
any person.
Sec. 1215 S
ign permitting and modifications.
See the S
ign Regulations Article of this Development Standards Ordinance for requirements and procedures for the issuance of sign permits
and for modifications to the signage provisions.
Sec. 1216 T
ext amendments.
This
Development Ordinance may be amended from time to time in whole or in part by the County Council under the provisions of this
Section.
1216 (a) In
itiation of text amendments.
The Count
y Council, the Planning Commission, or the Planning Department may propose a change to the text of this Development Ordinance
when public necessity, general welfare, or good planning practice justify such action.
1216 (b) D
ecision actions for Text Amendments.
Befor
e the County Council may take final action on a proposed text amendment, the Planning Commission and the County Council shall
each hold a public hearing on the proposal. After the public hearing the Planning Commission and the County Council will be guided by the
following:
1) The Planning Commission shall have sixty (60) days following its public hearing in which to make its recommendation to County
Council. Failure to make a recommendation shall go forward to the County Council as no comment.
2) After the minimum required readings and following its public hearing, the County Council shall consider the text amendment.
3) In considering a text amendment, action shall be considered by vote of the members present.
4) In taking final action on an amendment, the County Council may:
a. Approve, approve with changes, or deny the proposal; or,
12-26
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
b. Return the proposed amendment to the Planning Commission for further consideration.
1216 (c) Ef
fect of text amendment approval.
1) Approv
al of a text amendment shall be in full force and effect upon its approval by the County Council or upon the stated eff ective
date thereof.
2) For a property on which a use, building, structure or other improvements existed in conformity with this Development Ordinanc e
prior to the effective date of a text amendment affecting the property, any such use, building, structure or other improvements n o
longer in conformance shall be governed under the Legal Nonconforming Development Article of this Development Ordinance.
3) Construction of any use, building, structure, or other improvements for which a building permit has been issued in conformity with
this Development Ordinance prior to the effective date of a text amendment may continue to completion as though no change had
occurred and, upon completion, shall be governed under the Legal Nonconforming Development Article of this Development
Ordinance, as applicable.
Sec. 1217 Te
mporary suspension of permitting during application review.
Upon ini
tiation or submission of a valid application for a land use permit on a property, a valid application for a development permit, or the
initiation of a text amendment, no permits shall be issued, nor shall any actions be undertaken on the property that may be affected by the
outcome of such application.
12-27
Article 12: Procedures & Permits
Pickens County UDSO: Amended 2/16/10, 9/19/16, 12/5/16, 4/1/24
BLANK PAG
E