MLGW Agenda
Committee Discussion
MLGW Committee
September 15, 2026
Fiscal Consent Totals:
2
1. Total Fiscal Consent Approved Amount Year-to-Date – $185,671,791.58
Items approved by Council through 09/01/2026.
2. Total Regular/Fiscal Consent Requested Amount – $7,730,670.63
Items requested for 09/15/2026 meeting.
3. Total Regular/Fiscal Consent Year-to-Date Amount – $193,402,462.21
Total of approvals and requests through 09/15/2026 meetings.
Items for September 15th Agenda
Items approved by BOC on September 2nd
3
1. Resolution approving the Renewal and Increase (Change No. 4) Contract No. 12302, Substation Engineering Services (Protection) with Fisher &
Arnold, Inc. to renew and increase the current contract in the funded not-to-exceed amount of $1,000,000.00.
2. Resolution approving payment deposit of an invoice from Tennessee Department of Transportation (TDOT) for the Lamar Phase 3 (US 78 Raines
Rd./Perkins Rd. Interchange to SR 176 (Getwell Rd.) in the amount $3,831,452.63 to relocate MLGW Electric distribution facilities. (SAME NIGHT
MINUTES REQUESTED)
3. Resolution approving the Scope Expansion, Increase and Extension (Change No. 2) to Contract No. 12621 (formerly Contract No. C2805) BESS
Strategic Placement with GDS Associates, Inc., to expand the scope, increase and extend the current contract in the funded amount of $420,000.00.
4. Resolution approving payment deposit of an invoice from Tennessee Department of Transportation (TDOT) for the Lamar Phase 3 (US 78 Raines
Rd./Perkins Rd. Interchange to SR 176 (Getwell Rd.) in the amount $716,454.00 to relocate MLGW GAS distribution facilities. (SAME NIGHT
MINUTES REQUESTED)
5. Resolution approving Scope Expansion and Increase (Change No. 12) to Contract No. 10927, Perpetual Licensing Agreement with Precisely Software,
Incorporated (previously Pitney Bowes Software, Incorporated) to expand the scope and increase the contract value in the funded amount of
$118,358.00.
Items for September 15th Agenda
Items approved by BOC on September 2nd
4
6. Resolution approving the Extension and Increase (Change No. 3) to Contract No. 12552 (formerly Contract No. C2673), Gartner Advisory Services
with Gartner, Inc., to extend and increase the contract in the funded amount of $233,740.00.
7. Resolution awarding a purchase order for CN-7500 KVA transformers to Nexgen Power Inc. in the amount of $740,600.00.
8. Resolution approving the Increase and Extension (Change No. 6) to Contract No. 12103, Workers’ Compensation Stop Loss Brokering with Willis
Towers Watson of Tennessee, Inc. to increase and extend the current contract in the funded amount of $418,066.00.
9. Resolution approving the Increase and Extension (Change No. 4) to Contract No. 12314 (formerly C2372), Broker of Record for Cyber Insurance and
Other Insurance Coverages with Willis Towers Watson Southeast, Incorporated, to increase and extend the current contract in the funded amount of
$252,000.00.
Substation Engineering Services (Protection)
5
• Requested Funding: $1,000,000.00
• Award Duration: Increase and Fourth and Final renewal (November 21, 2026 through November 20,
2027)
• Type of Bid: RFQ
• Awarded to: Fisher & Arnold, Inc.
• Plain Language Description: This contract is to provide Protection Engineering services including, but
not limited to, creating and/or updating protection one lines, schematics, and wiring drawings;
installation and replacement of protective relays, remote terminal units, fault recorders, control board
panels, and equipment wiring; developing relay settings for electromechanical and digital relays.
• Impact: The need exists to supplement existing resources to assist in completing projects to support
the Distribution Automation (DA) program and support the renewal and replacement of infrastructure
program goals for the replacement of substation switches, circuit breakers, and power transformers.
ELECTRIC TDOT Utility Relocation– Lamar Phase 3
(Raines to Getwell)
6
• Requested Funding: $3,831,452.63
• Award Duration: One-time deposit
• Type of Bid: N/A
• Awarded to: Department of Transportation (TDOT)
• Plain Language Description: State contract for which the utility is responsible for and is obligated to
pay the State the estimated deposit amount. The Overhead Installation includes: 30 poles; 15
underslung switches; approximately 13,000’ of OH conductor; and 19 down guys. The Underground
Installation includes: approximately 13,000’ of UG cable; 2,270’ of 4” PVC conduit; 16,000’ of 5” PVC
conduit; 4 manholes; and 6 primary risers.
• Impact: The utility has furnished TDOT with an estimate, plans, and specifications showing the cost
and manner of relocating these facilities, which estimate is in the amount of $6,145,715.56.
BESS Strategic Placement
7
• Requested Funding: $420,000.00 ($370,000.00 proposal amount plus $50,000.00 in contingency
funds)
• Award Duration: Scope Expansion, Increase and Extension (December 2, 2026 through December
31, 2027)
• Type of Bid: Professional Services
• Awarded to: GDS Associates, Inc.
• Plain Language Description: This change will expand the scope of work to support MLGW’s Battery
and Energy Storage Systems RFP initiatives. GDS will conduct a series of technical studies to
evaluate two sets of Battery Energy Storage Systems (BESS) interconnections at nine (9) BESS
installations of 10-20 MW each, which will connect on the distribution side of existing MLGW
substations.
• Impact: The professional services will support MLGW’s BESS efforts to improve the reliability and
resiliency of the electric grid and ensure the continued availability of affordable power for MLGW’s
customers for decades to come.
GAS TDOT Utility Relocation – Lamar Phase 3 (Raines to
Getwell)
8
• Requested Funding: $716,454.00
• Award Duration: One-time deposit
• Type of Bid: N/A
• Awarded to: Department of Transportation (TDOT)
• Plain Language Description: State contract for which the utility is responsible for and is obligated to
pay the State the estimated deposit amount. To install approx. 6600’ of gas main(2”,4”,8”) and
approx. 940’ of gas service lines(3/4”-1 ½”).
• Impact: The utility has furnished TDOT with an estimate, plans, and specifications showing the cost
and manner of relocating these facilities, which estimate is in the amount of $2,736,750.00.
Perpetual Licensing Agreement EngageOne Vault
9
• Requested Funding: $118,358.00 ($102,920.00 quote amount plus $15,438.00 in contingency funds)
• Award Duration: Scope Expansion and Increase (September 1, 2026, through December 28, 2030)
• Type of Bid: Single Source
• Awarded to: Precisely Software, Inc.
• Plain Language Description: The purpose of this project is to implement the Precisely EngageOne
Vault platform at Memphis Light, Gas and Water (MLGW) to modernize and streamline the
organization’s customer communication, management and secure document viewing and archival
capabilities. EngageOne Vault will provide MLGW with a centralized, highly scalable, and compliant
repository to store, manage, and retrieve customer letters and bills, notices, and regulatory
correspondence.
• Impact: Without the EngageOne Vault application, MLGW would continue to rely on outdated manual
and fragmented processes and applications to archive and view printed letters, billing statements
and customer notices.
Gartner Advisory Services
10
• Requested Funding: $233,740.00
• Award Duration: Extension and Increase (November 1, 2026 through October 31, 2027)
• Type of Bid: Cooperative Purchasing Contract - using State of Tennessee contract
• Awarded to: Gartner, Inc.
• Plain Language Description: Gartner provides MLGW with unbiased research and consulting
services with an emphasis on technology, cybersecurity, utility benchmarking, and other key areas
within the industry. The research tool is used by Performance Engineering and Information
Technology for comparative analysis of vendors and technical solutions, along with personalized
consultations with industry experts.
• Impact: Gartner Advisory Services delivers invaluable insights that empower organizations within the
technology sector to benchmark their performance and integrate industry standards, particularly from
the utility and energy domains.
CN-7500 KVA Transformers
11
• Requested Funding: $740,600.00
• Award Duration: One-Time Purchase
• Type of Bid: Sealed
• Awarded to: Nexgen Power Inc.
• Plain Language Description: To purchase two CN-7500 KVA transformers to support a reliable
distribution system and ensure the continued delivery of dependable electric services to our
customers. There are plans to install two new 23/12 kV distribution step-down transformers over the
next couple of years in the Sub 78 (Lamar and Airways) area and the Sub 84/Sub 15 (Millington and
Northeast Shelby) areas.
• Impact: The transformers are being acquired to support infrastructure improvements and for new
construction while allowing us to have a spare for inventory.
Workers’ Compensation Stop Loss Brokering
12
• Requested Funding: $418,066.00
• Award Duration: Increase and one (1) year extension (October 1, 2026 through October 1, 2027)
• Type of Bid: RFP
• Awarded to: Willis Towers Watson of Tennessee, Inc.
• Plain Language Description: A broker is needed as part of the requirements for soliciting,
implementing and maintaining a Workers Compensation Stop Loss insurance policy.
• Impact: This contract will keep MLGW in compliance with the State mandated requirement for
supporting our Workers’ Compensation Stop Loss policy.
Broker of Record for Cyber Security
13
• Requested Funding: $252,000.00
• Award Duration: Increase and Extension (October 1, 2026 through September 30, 2027)
• Type of Bid: RFP
• Awarded to: Willis Towers Watson Southeast, Incorporated
• Plain Language Description: To acquire and secure Broker of Record for Cyber Insurance to mitigate
liability risk.
• Impact: Cyber insurance covers financial losses from cyber attacks like data breaches, ransomware
and business interruption.
Questions
September 2026
PUBLIC SAFETY UPDATE
OVERVIEW OF CRIME DATA
PUBLIC SAFETY UPDATE
OVERVIEW OF CRIME DATA
Chief Cerelyn “CJ” Davis
Chief Cerelyn “CJ” Davis
Memphis Police Department
2 0 2 4 2 0 2 5 2 0 2 6
J a n u a r y F e b r u a r y M a r c h A p r i l M a y J u n e J u l y A u g u s t S e p t e m b e r
1 0 0 0
2 0 0 0
3 0 0 0
4 0 0 0
4 2 5 8
3 7 0 9
1 9 2 9
4 2 5 2
3 1 3 8
1 9 5 3
4 1 9 5
3 6 3 4
2 2 6 0
4 4 6 0
3 8 4 2
2 3 5 4
5 2 1 4
3 9 3 9
2 3 9 5
5 1 5 3
3 5 3 5
2 5 6 3
5 1 1 1
3 6 3 8
2 5 1 7
4 3 6 2
3 3 1 6
2 3 7 3
1 1 6 8
9 1 3
6 3 8
Part I Crime Overview
Part I crime has fallen steadily for three years, with the decline holding through September 2026.
Year-over-Year Comparison (2024-2026)
Crime Data as of September 8, 2026
2 0 2 5 2 0 2 6
M u r d e r A g g r a v a t e d A s s a u l t S e x u a l A s s a u l t R o b b e r y B u r g l a r y L a r c e n y M o t o r V e h i c l e T h e f t s
2 0 0 0
4 0 0 0
6 0 0 0
8 0 0 0
1 0 0 0 0
1 4 7 9 5
4 4 6 1
3 2 6 9
4 7 2 3 3 5
1 1 9 1
6 8 4
3 0 8 6
2 2 4 9
1 5 6 3 8 1 0 4 0 9
4 6 7 0
1 9 8 7
Crime Trends
Every major crime category is trending downward
Two-Year Comparison Through September 8, 2026 (2025-2026)
C r i m e D a t a a s o f S e p t e m b e r 8 , 2 0 2 6
2 0 2 5 2 0 2 6
J a n u a r y F e b r u a r y M a r c h A p r i l M a y J u n e J u l y A u g u s t S e p t e m b e r
2 0 0 0 0
3 0 0 0 0
4 0 0 0 0
5 0 0 0 0
6 0 0 0 0
7 0 0 0 0
7 2 4 3 1
5 6 1 8 4
6 4 0 1 4
5 5 2 2 8
7 3 0 9 7
6 5 4 3 1
7 4 8 9 5
6 1 2 4 4
7 3 6 9 3
6 3 5 9 0
7 2 4 2 7
6 3 2 8 5
7 6 6 5 0
6 4 9 5 4
7 9 1 2 4
6 6 7 5 1
1 9 6 8 3
1 7 8 3 8
Calls for Service
Year-End Comparison (2025-2026)
Data as of September 8, 2026
Year ‑ to ‑ date data from 2025 to 2026 shows calls for service continuing to decline.
Austin Peay Station
Down 29.52% Raines Station
Down 33.03%
Mt. Moriah Station
Down 42.58%
Crump Station
Down 27.07%
Tillman Station
Down 39.85%
North Main Station
Down 29.25%
Airways Station
Down 37.80%
Appling Farms Station
Down 43.80%
Ridgeway Station
Down 37.06%
Citywide Crime Declines by Stations
2026 Year-to-Date Part I Crime Reduction
Data as of September 8, 2026
Memphis Safe Operation
Recovered Firearms: 4,793
Felonies: 2,670
Misdemeanors: 2,487
Traffic stops: 185,502
Felonies: 8,022
Misdemeanors: 12,022
ARRESTS
Felonies / Misdemeanors
FIREARMS
Recovered Firearms
TRAFFIC STOPS
Traffic Enforcement
WARRANTS
Felonies / Misdemeanors
CURRENCY
Seized
$1,929,488.60
VEHICLES
Recovered Vehicles
Recovered Vehicles: 2,672
Together, these actions have created sustained pressure on those who cause harm, contributing to a safer and more stable
environment across the city.
Operational Period: October 1, 2025 - September 8, 2026
Memphis Safe Operation - Drug Seizures
MARIJUANA
CONFISCATED
3,362.88
lbs
STREET VALUE
$4.0M - $6.2M
FENTANYL
CONFISCATED
61.30
lbs
STREET VALUE
$2.7M - $4.1M
METHAMPHETAMINE
CONFISCATED
306.65
lbs
STREET VALUE
$1.7M - $3.6M
During this operating period, narcotics seizures have removed dangerous drugs from circulation within the City of Memphis. The seized narcotics
carry an estimated street value that varies based on drug type, availability, and quality.
Operational Period: October 1, 2025 - September 8, 2026
September 2026
THANK YOU!
THANK YOU!
Chief Cerelyn “CJ” Davis
Chief Cerelyn “CJ” Davis
Memphis Police Department
City of Memphis | Finance | Capital Improvement Program (CIP)
CoM Public
PROJECT STATUS & TIMELINE
DEPARTMENT INFORMATION
FINANCIAL SNAPSHOT OF RECEIVING PROJECT
PURPOSE OF TRANSACTION
CIP TRANSFER AND/OR APPROPRIATION AMOUNT
ANTICIPATED ISSUES / RISKS
CITY OF MEMPHIS
COUNCIL CAPITAL PROJECT INFORMATION SHEET
Department / Division:
Council Action Date:
Receiving Project Name &
Number:
COMPLETED BY CIP TEAM:
Transaction Number (P###):
Allocation-To-Date:
Appropriation-To-Date:
Spend-To-Date:
Remaining Balance:
Encumbrances / Committed Funds:
Contract(s) Attached? Yes: No:
Transferred / Appropriated Amount:
Status: Start Date: End Date:
posted August 2026
P029
HOUSING & COMMUNITY DEVELOPMENT
09/15/2026
CD01108 Middle Income Housing Infrastructure
1,000,000.00
50,000.00
0.00
1,000,000.00
0.00
✔
Appropriation of funds to support FY27 funding round - projects to be determined during
application/award cycle.
Active
09/03/2026
09/30/2027
None
Docusign Envelope ID: 11EE4005-5F75-8830-81EE-D4EB73D88DA6
Memphis City Council Summary Sheet
(Revised January 28, 2026)
1. Description of the Item (Resolution, Ordinance, etc.)
Resolution to appropriate the remaining $950,000.00 of the $1,000,000.00 G.O. Bond
allocation approved in the FY2027 Capital Improvement Program (CIP) budget for
Middle Income Housing Infrastructure (CD01108).
2. Initiating Party (e.g. Public Works, at request of City Council, etc.)
Division of Housing & Community Development
3. State whether this is a change to an existing ordinance or resolution, if
applicable.
N/A
4. State whether this will impact specific council districts or super districts.
All council and super council districts impacted based on applications/awards
(available citywide)
5. State whether this requires a new contract, or amends an existing contract, if
applicable.
N/A
6. State whether this requires an expenditure of funds/requires a budget
amendment.
Yes, this will require an expenditure of funds.
7. If same night minutes are requested, state the reason for the urgency.
Same night minutes are requested to allow timely appropriation of funds.
Docusign Envelope ID: 11EE4005-5F75-8830-81EE-D4EB73D88DA6
Resolution to Appropriate the sum of $950,000 funded by G.O.
Bonds chargeable to the FY20 27 Capital Improvement
Program (CIP) Budget for Middle Income Housing
Infrastructure, CD01108.
WHEREAS, Memphis City Council included an allocation of ONE MILLION DOLLARS ($1,000,000)
for Middle Income Housing Infrastructure, project number CD01108, as approved in the FY2027
Capital Improvement Program Budget; and
WHEREAS, of the ONE MILLION DOLLARS ($1,000,000) allocated for project CD01108, FIFTY
THOUSAND DOLLARS ($50,000) was appropriated for architectural and engineering costs through
the FY2027 Capital Improvement Program Budget, leaving a balance of NINE HUNDRED FIFTY
THOUSAND DOLLARS ($950,000) requiring appropriation; and
WHEREAS, the remaining balance will fund the Middle-Income Housing Pilot (MI-Pilot) Program,
administered by the City of Memphis Division of Housing and Community Development (HCD) ,
which will offset eligible infrastructure costs for local developers in the construction and
rehabilitation of infill missing-middle housing units attainable for middle-income Memphians; and
WHEREAS, it is necessary to appropriate the remaining NINE HUNDRED FIFTY THOUSAND
DOLLARS ($950,000) of the FY2027 Capital Improvement Program allocation to support a third
round of funding for eligible missing-middle housing projects; and
NOW, THEREFORE, BE IT RESOLVED by the Council of the City of Memphis that the sum of NINE
HUNDRED FIFTY THOUSAND DOLLARS ($950,000) funded by G.O. bonds chargeable to the FY2027
Capital Improvement Program (CIP) Budget is hereby appropriated and credited as follows:
Project Title: Middle Income Housing Infrastructure
Project Number: CD01108
Contract Construction: $800,000.00
Other Cost: $150,000.00
P029
Docusign Envelope ID: 11EE4005-5F75-8830-81EE-D4EB73D88DA6
P026
Docusign Envelope ID: 332325C2-10E1-8E9A-83F5-7C0E75FFE5EE
Docusign Envelope ID: 332325C2-10E1-8E9A-83F5-7C0E75FFE5EE
P026
Docusign Envelope ID: 332325C2-10E1-8E9A-83F5-7C0E75FFE5EE
CoM PublicKnight Arnold/Johns Ck Bridge Repair•Project Description: This Project is for the emergency repair of the Knight Arnold Bridge over John’s Creek in Memphis, TN. The City of Memphis Division of Public Works has successfully bid on the project, and the low responsive bidder is Bell & Associates Construction, LLC.Construction Funds Required:$800,000.00PW02039
Project Site Location
Note: Resolution is to transfer construction funds from PW01025 to PW02039
TDOT: Bridge Evaluation ReportKnight Arnold: Bridge Closure
MEMPHIS STORMWATER QUALITY
and QUANTITY (MSQ2) PROGRAM
MEMPHIS CITY COUNCIL UPDATE
From Project Identification to
Construction
September 15, 2026
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Purpose of Today's Briefing
Why we are before the Council.
To provide the Memphis City Council an update on the MSQ2 Program by reporting the
status of all drainage projects.
STATUS OF PROJECTS
• Where each approved drainage
project stands, from planning
and design through
procurement, construction, and
completion.
INVESTMENT AND VALUE
• The construction value tied to
each delivery stage and what the
program is putting into the
ground today.
PROJECTS ACROSS COUNCIL
DISTRICTS
• Where projects are located so
council members can speak to
work in their communities.
PROJECTS START TO FINISH
• The selection, real estate,
design, and procurement steps
every project must clear before
construction begins.
September 2026 update covering the 59 projects approved for design of which 28 projects have signed plans, are under construction, or constructed.
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Agenda
What we will cover in this update.
01 How Projects are Selected for Design Slides 4-5 | Selection process and RIPP scoring
02 Timeline to Construction Slides 6-7 | Four phases and what happens inside each
03 Funding the MSQ2 Program Slide 8 | Cash, bonds, and federal and state lending
04 Project Delivery in Numbers Slides 9-10 | Program totals, program spend, and status of all 59 projects
05 Constructed, Active, and Upcoming Projects Slides 11-12 | Delivery portfolio and approved projects citywide
06 Districts, Takeaways, and Questions Slides 13-15 | District stages, takeaways, and Q&A
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
How Projects are Selected for Design
Data and models drive the process
DATA-DRIVEN
RISK
SCORING
Models in, priorities
out
1. IDENTIFY
Basin studies, condition data,
311 reports
2. ANALYZE
Digital models, mapping, field
verification
3. PRIORITIZE
Flooding impacts, condition,
benefit-cost
4. RIPP
Risk scoring, flood extents, cost
estimates
5. GO / NO-GO
Clear the risk, cost and
readiness test to advance to
design
About the Process
Digital models plus real field and flood data tell us how
much risk each location carries.
Every project is scored on the same risk factors, so
decisions are data-driven and objective.
The cycle repeats as new data arrives, keeping the
priority list current citywide.
After a Project is approved by the Go/No-Go Committee it
must also receive final approval by the Director of Public
Works and the Director of City Engineering.
4
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
About the RIPP Score
Risk-Integrated Project Prioritization: one measure for every drainage project.
The score measures the drop in risk
HIGH
LOWTHE DROP
= the benefit
RISK TODAY RISK AFTER THE FIX
What goes into the score
How likely flooding is, and what it would damage: homes and
buildings, streets, utilities, creeks and waterways.
Four categories count: flood risk, water quality, public safety,
and quality of life.
Cost divided by risk removed = the ranking
Every project in the city is measured with this same yardstick,
so the ones that remove the most risk per dollar are built first.
5
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Timeline to Construction
Every approved project passes four sequential phases before a contractor can break ground.
01 SELECTION + PRE-DESIGN
TYPICAL DURATION
6 - 12 months
• Basin studies, modeling,
condition data
• RIPP risk scoring and flood
mapping
• Go / No-Go decision by City staff
02
TYPICAL DURATION
6 - 18 months
• ROW, easements, temporary
easements
• Ownership, plats, legal
descriptions
• Environmental review, Law
Division sign-off
03 ENGINEERING DESIGN
TYPICAL DURATION
12 - 18 months
• 30%, 70%, 90% and 100%
submittals
• Utility, ADA and traffic control
reviews
• Signed and sealed construction
plans
04 PROCUREMENT +
AWARD
TYPICAL DURATION
3 - 6 months
• Advertise, pre-bid, addenda, bid
opening
• Bid review and Council review and
approval
• Notice of intent to award, contract
executed
Approval to construction start: 2 to 4 years Phases run in sequence: real estate must clear before design
begins, and plans must be complete before bidding.
Durations are typical planning ranges for MSQ2 drainage projects, not commitments for any individual project. Complex easement negotiations, utility conflicts, or funding timing can extend any phase.
REAL ESTATE ACQUISITION
(IF REQUIRED)
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
What Happens Inside Each Phase
The steps that consume the schedule, and why each one protects the City's investment.
SELECTION + PRE-DESIGN
• Screening, modeling and RIPP
scoring justify each dollar
• 127 RIPP scores, 57 pre-design
models complete
• 59 approved into design
• Go / No-Go is a formal City
decision
REAL ESTATE ACQUISITION
(IF REQUIRED)
• No design starts until property
rights are executed
• ROW, easements, temporary
easements, purchases
• Ownership verified, plats and
legal descriptions prepared
• Phase I environmental review
for acquisitions
• Exceptions need written
director approval
ENGINEERING DESIGN
• Projects bundled and assigned
to qualified firms
• Firms qualified on a two-year
procurement cycle
• Submittals reviewed at 30, 70,
90 and 100 percent
• Two weeks of City review per
submittal
• Utility, structural, ADA and
traffic coordination
• Mylars signed and sealed
before bidding
PROCUREMENT +
AWARD
• City assigns a project number
and advertises
• Pre-bid meeting and addenda
answer bidder questions
• Bids opened at City Hall,
reviewed for compliance
• Council review and approval
• Notice of intent to award,
contract executed
Sources: MSQ2 program overview briefing, real estate clearance SOP , program roles and responsibilities, and the water resources operational efficiency report.
01 02 03 04
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
MSQ2 Program Funding and Spending to Date
Three funding sources support the capital program, with spending to date and construction values shown below.
Cash on Hand
City stormwater cash reserves
Cash reserves applied to program costs
WIFIA and Other Loans and Grants
Water Infrastructure Finance and Innovation
Act loan, plus other state and federal grants
Low-interest lending and outside grant awards
Stormwater Revenue Bonds
Bond proceeds dedicated to stormwater
capital work
Primary source of capital funding
PROGRAM SPENDING SINCE INCEPTION
Administration, Capital Planning, H&H Modeling — $17.8M
Drainage Project Design and Engineering — $7.3M
Mapping and Condition Assessment — $9.1M
Construction Inspection — $80K
PROJECT CONSTRUCTION VALUES
Completed Construction Projects — $3M
Current Construction Projects — $20.5M
Pending Procurement — $29.3M (Estimated)
Under Design — $55.1M (Estimated)
8
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Project Delivery in Numbers
The MSQ2 pipeline has advanced from data-driven selection into visible design and construction delivery.
59
projects approved for design
$109.3M
estimated construction
value
Across design and construction phases
21
constructed or building now
11 constructed + 10 under construction
7
pending procurement
Positioned for procurement / delivery
KEY MESSAGE FOR
COUNCIL MSQ2 has created a disciplined pipeline that moves priority drainage needs
through design, procurement, construction, and completion.
9
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Status of all 59 Projects
Every approved project is assigned to a defined delivery stage.
Planning + Scoping 5 $6.9M
Preliminary / 30%
Design 6 $16.1M
70%–90% Design 8 $21.9M
100% / Final Design 12 $11.5M
Constructed / Under
Construction/Pending
Procurement
28 $52.8M
59 TOTAL
10
Estimated or Actual
Construction Costs
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Delivery Portfolio: 28 Constructed, Under Construction, Pending Procurement
Constructed, under construction, and plans-signed projects with construction value and Council district.
CONSTRUCTED
11 projects · $3.0M
Mysen Circle — $511K · Council District 2/9
Humphreys Box Culvert — $769K · Council District 2/9
Oakwood — $60K · Council District 3/8
GE Patterson — $25K · Council District 7/8
St. Elmo — $100K · Council District 7/8
Argonne — $45K · Council District 7/8
Mill Avenue — $995K · Council District 7/8
Castlewood — $50K · Council District 6/8
Steeplebrook Drive — $14K · Council District 1/9
Agnes Place — $30K · Council District 6/8
Hollywood Sheet Pile — $375K · Council District 7/8
UNDER CONSTRUCTION
10 projects · $20.5M
Bartlett Road Bridge — $8.00M · Council District 1/9
Estimated Completion Date: December 2028
Morningside Place — $4.68M · Council District 5/9
Estimated Completion Date: August 2027
Whitehaven Gardens CCL — $3.75M* · Council District 3/8
Estimated Completion Date: November 2026
Tonto — $965K · Council District 6/8
Estimated Completion Date: October 2026
Central Station — $879K · Council District 6/8
Estimated Completion Date: October 2026
Peebles — $787K · Council District 6/8
Estimated Completion Date: November 2026
Memphis Business Academy — $540K · Council District 7/8
Public/Private Partnership with construction by private partner, estimated
completion date not available
S Germantown Rd — $359K · Council District 2/9
Estimated Completion Date: May 2027
Madeline Circle — $334K · Council District 7/8
Estimated Completion Date: September 2026
Lillian — $251K · Council District 6/8
Estimated Completion Date: September 2026
PENDING PROCUREMENT
7 projects · $29.3M (Estimated)
Harrison CCL Repair — $12.14M · Council District 7/9
Cypress CCL Repair A — $9.60M · Council District 7/8
Richbriar CCL Repair — $4.02M · Council District 2/9
Chickamauga Ave — $1.62M · Council District 6/8
Santa Clara Ave / Buxton Rd — $1.35M · Council District 3/8
2700 Summer Ave — $569K · Council District 5/9
Timber Creek — $26K · Council District 2/9
* Whitehaven Gardens: Phase 1 in construction; Phases 2 and 3
to be bid.
11
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Approved Projects Across the City
12
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Project Stages Per Council Districts
All 59 approved projects by Council district and super district, shown by delivery stage.
13
1
2
1
1
3
1
4
5
6
5
2
2
1
1
1
2
1
1
1
1
4
2
1
2
1
2
5
District 1
District 2
District 3
District 4
District 5
District 6
District 7
Scoping and Planning Design Pending Procurement Under Construction Construction Completed TOTAL PROJECTS
District 1 6
District 2 6
District 3 9
District 4 5
District 5 8
District 6 13
District 7 12
Super District 8 34
Super District 9 25
59 approved projects
SUPER DISTRICTS
3
2
13
13
3
4
7
3
8
3
Super District 8
Super District 9
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
Council Takeaways
The program is translating prioritized stormwater needs into a growing construction portfolio.
DELIVERY 21 projects constructed or
under construction
NEXT WAVE
7 projects with signed plans
PIPELINE 31 projects in scoping or
design
INVESTMENT $109.3M estimated
construction value
The City of Memphis along with MSQ2 will continue advancing approved projects through design, procurement, construction, and
completion while maintaining transparent reporting to City leadership and the public.
Questions & Discussion
14
M S Q 2 P R O G R A M | M E M P H I S C I T Y C O U N C I L U P D A T E
City of Memphis Stormwater Quality and Quantity Program September 2026
M S Q 2 P R O G R A M U P D A T E
Questions and Answers
Thank you. We welcome the Council's questions on any project or district.
Docusign Envelope ID: 79C960C6-96D8-862F-80EA-E41C855FD724
Docusign Envelope ID: 79C960C6-96D8-862F-80EA-E41C855FD724
Docusign Envelope ID: 79C960C6-96D8-862F-80EA-E41C855FD724
at Liberty Park
Project Summary, Fall 2026
INTRODUCTION
Bluff City Pickleball and its owners, John and Leslie
Daniel, are partnering with the City of Memphis to
transform the Pipkin Building in Liberty Park into a
vibrant, year-round pickleball club serving
residents of all ages and skill levels.
ABOUT
PICKLEBALL
America’s fastest growing sport
Requires minimal equipment and iseasy to learn
Inclusive, lifelong recreation thatpromotes physical activity, socialconnection, and healthycompetition across generations
90% of those who try say theywould play again
ABOUT
BLUFF CITY
Opened in Bartlett in 2024
Repurposed a vacant former movie
theater into a vibrant, community-
centered club
Awarded “Best New Business” by
Best in Memphis (2024)
400 active members and over
10,000 total players
WHAT MAKES
US DIFERENT
Owners John and Leslie Daniels operate Bluff
City as a SOCIAL ENTERPRISE: social goals
are priorizied as equally as profitablity.
John is a heart transplant survivor, former
Chief Human Resources Officer at First
Horizon Bank, and a Harvard Fellow who
studied social impact strategies. Leslie is also a
veteran of the banking industry who serves on
numerous philanthropic boards
They opened Bluff City because they realized
pickleball improves not just physical and
mental well-being, but also connects people
from all walks of life.
WE ARE BLUFF CITY PICKLEBLALL
PIPKIN
BUIDLING
4
8 - 9 pickleball courts
Reception and check-in area
Small retail pro shop
Seating and gathering spaces
Programming including open play,
leagues, clinics, youth instruction,
regional tournaments, and senior
wellness activities
Open 8 a.m. to 9 p.m. every day
except Christmas
Planned Amenities & Features
KEY PROJECT POINTS
City leasesbuilding to BCPC
City receives rent& profit sharing
BCPC runsoperations &programming
BCPC pays forutilites & routinemaintenance
City pays formajor repairs
BCPC paysfor renovationcosts into apickleball club
City Benefits
Activation of underutilized asset
& ongoing stable lease revenue
Private investment into public
infrastructure
Community programming
2500 hours of set aside court
time for youth programming
Additional attraction at
Liberty Park
Out-of-town visitors for
tournaments & special events
Owners to fund scholarships for
underserved residents
This project combines private investment, public benefit,and community impact. We believe Bluff City at LibertyPark can become a model for innovative recreationalpartnerships in Memphis.
A resolution to allocate and appropriate $2,388,000 in City Council Community Grant funds to
nonprofit agencies for FY27
WHEREAS , the Memphi s City Counci l desires to promot e communit y programmin g and
improv e neighborhood s; and
WHEREAS, the Tennessee Code Annotated § 6-64-111, empowers the Memphis City
Council to appropriate funds for the financial aid of nonprofit organizations working to promote
the general welfare of Memphis residents; and
WHEREAS , nonprofi t organizatio ns and citizens work together to meet the needs of
Memphia ns by extendin g the reach of Cit y of Memphis services ; and
WHEREAS , the Memphi s City Council recogniz es nonprofi t agencies as value d partners
in the continuin g efforts to improv e the lives of Memphia ns; and
WHEREAS, it is important to the members of the Memphis City Council to prioritize
funding specialized programs congruent with the priorities of the City, which include addressing:
Crime and Drug Prevention, Youth Empowerment, Economic Development, and Poverty; and
WHEREAS, each member began the fiscal year with the ability to allocate $200,000 to
ensure adequate grant awards amongst all City Council Districts; members of the Council are
afforded the opportunity to designate their full FY27 $200,000 allotment at one time or to hold a
portion of their allotment in abeyance with further consideration and distribution of their
remaining funds to be decided by resolution at a later date; and
WHEREAS, Council Members must allocate at least 75% of their allotment during the
August 18th Council meeting; the remaining 25% may be allocated at a later date; and
WHEREAS, after selecting organizations, Council Members may allocate funding during
Budget Committ ee meeting s; eligible nonprofi t agencies shall receive grant awards as outlined
within Attachme nt A, subject to final approval by the City of Memphi s Finance Division .
NOW, THEREFOR E BE IT RESOLVE D that the Memphi s City Counci l does allocate
the following grant funds in accordance with Attachment A as part of the Memphis City Council
Grant Program for FY27.
THEREFORE, BE I T FURTHER RESOLVED that the grant recipient s must execute a
contract with the City of Memphis Finance Division to receive their grant awa rd and submit a
Final Report for review by the City of Memphis Finance Division to remain eligible to receive
grant funding i n subsequent fiscal years.
Sponsor(s):
Chairwoman Jana Swearengen-Washington
Vice Chairman Chase Carlisle
Janika White
Yolanda Cooper-Sutton
Dr. Michalyn Easter-Thomas
Edmund Ford Sr.
Jerri Green
Rhonda Logan
JB Smiley, Jr.
Phillip Spinosa
J. Ford Canale
Pearl Walker
Dr. Jeff Warren