Memphis City Council
Summary Sheet
SUP 2026-014
RESOLUTION PURSUANT TO CHAPTER 9.6 OF THE MEMPHIS AND SHELBY COUNTY
UNIFIED DEVELOPMENT CODE APPROVING A SPECIAL USE PERMIT AT THE SUBJECT
PROPERTY LOCATED AT 2451 SUMMER AVENUE , KNOWN AS CASE NUMBER SUP 2026-
014
• This item is a resolution with conditions for a special use permit to allow a car
wash; and
• The item may require future public improvement contracts.
1
LAND USE CONTROL BOARD RECOMMENDATION
At its regular meeting on Thursday, August 13, 2026, the Memphis and Shelby County Land Use Control
Board held a public hearing on the following application:
CASE NUMBER: SUP 2026-014
LOCATION: 2451 Summer Avenue
COUNCIL DISTRICT(S): District 5 and Super District 9 – Positions 1, 2, and 3
OWNER/APPLICANT: Hazem Shoman
REPRESENTATIVE: Christine Donhardt
REQUEST: Special use permit to allow a car wash
EXISTING ZONING: Commercial Mixed Use – 1 (CMU-1) District
AREA: +/-35,283 square feet
The following spoke in support: Hazem Shoman, Sanders Snowden, Brian Bacchus
The following spoke in opposition: None
The Land Use Control Board reviewed the application and the staff report . A motion was made and
seconded to recommend approval with conditions.
The motion passed by a vote of 7-0 on the regular agenda.
Respectfully,
Cc: Committee Members
File
2
SUP 2026-014
CONDITIONS
1. Enhanced buffering along the property line adjacent to the alley and residential properties, including
evergreen landscaping and a sight -proof fence or wall, shall be provided subject to administrative
review and approval by the Division of Planning and Development.
2. The applicant shall limit the hours of operation to 8:00 a.m. to 6:00 p.m.
3. All detached signs shall be of the monument style.
4. Vehicular access to Summer Avenue is prohibited.
5. The applicant shall submit an Administrative Site Plan Review (ASPR) application that includes a site
plan, landscape plan, building elevations, lighting plan, and photometric plan subject to
administrative review and approval by the Division of Planning and Development.
3
SITE PLAN
RESOLUTION PURSUANT TO CHAPTER 9.6 OF THE MEMPHIS AND SHELBY COUNTY
UNIFIED DEVELOPMENT CODE APPROVING A SPECIAL USE PERMIT AT THE SUBJECT
PROPERTY LOCATED AT 2451 SUMMER AVENUE, KNOWN AS CASE NUMBER SUP 2026-
014
WHEREAS, Chapter 9.6 of the Memphis and Shelby County Unified Development Code, being a
section of the Joint Ordinance Resolution No. 5367, dated August 10, 2010, authorizes the Council of the
City of Memphis to grant a special use permit for certain stated purpos es in the various zoning districts;
and
WHEREAS, Hazem Shoman filed an application with the Memphis and Shelby County Division
of Planning and Development to allow a car wash; and
WHEREAS, the Division of Planning and Development has received and reviewed the application
in accordance with procedures, objectives, and standards for special use permits as set forth in Chapter 9.6
with regard to the proposed development's impacts upon surrounding propertie s, availability of public
facilities, both external and internal circulation, land use compatibility, and that the design and amenities
are consistent with the public interest; and has submitted its findings and recommendation concerning the
above considerations to the Land Use Control Board; and
WHEREAS, a public hearing in relation thereto was held before the Memphis and Shelby County
Land Use Control Board on August 13, 20 26, and said Board has submitted its findings and
recommendation concerning the above considerations to the Council of the City of Memphis; and
WHEREAS, the Council of the City of Memphis has reviewed the aforementioned application
pursuant to Tennessee Code Annotated Section 13 -4-202(B)(2)(B)(iii) and has determined that said
development is consistent with the Memphis 3.0 General Plan; and
WHEREAS, the Council of the City of Memphis has reviewed the recommendation of the Land
Use Control Board and the report and recommendation of the Division of Planning and Development and
has determined that said development meets the objectives, standards and criteria for a special use permit,
and said development is consistent with the public interests.
NOW, THEREFORE, BE IT RESOLVED, BY THE COUNCIL OF THE CITY OF
MEMPHIS, that, pursuant to Chapter 9.6 of the Memphis and Shelby County Unified Development Code,
a special use permit is hereby granted for the request use in accordance with the attached conditions.
BE IT FURTHER RESOLVED , that this permit merely authorizes the filing of applications to
acquire a Certificate of Use and Occupancy, or a Building Permit, and other required permits and approvals,
provided that no such Certificate of Use and Occupancy shall be granted until all conditions imposed by
the Council of the City of Memphis have been met.
BE IT FURTHER RESOLVED , that this Resolution take effect from and after the date it shall
have been passed by this Council of the City of Memphis, and become effective as otherwise provided by
law, and thereafter shall be treated as in full force and effect by virtue of passage thereof by the Council of
the City of Memphis, the public welfare requiring same.
CONDITIONS
1. Enhanced buffering along the property line adjacent to the alley and residential properties, including
evergreen landscaping and a sight -proof fence or wall, shall be provided subject to administrative
review and approval by the Division of Planning and Development.
2. The applicant shall limit the hours of operation to 8:00 a.m. to 6:00 p.m.
3. All detached signs shall be of the monument style.
4. Vehicular access to Summer Avenue is prohibited.
5. The applicant shall submit an Administrative Site Plan Review (ASPR) application that includes a
site plan, landscape plan, building elevations, lighting plan, and photometric plan subject to
administrative review and approval by the Division of Planning and Development.
SITE PLAN
LANDSCAPE PLAN
ELEVATIONS
ATTEST:
CC: Division of Planning and Development
– Land Use and Development Services
– Office of Construction Enforcement
Staff Writer: Mahsan Ostadnia E-mail: mahsan.ostadnia@memphistn.gov
AGENDA ITEM: 23 L.U.C.B. MEETING: August 13, 2026
CASE NUMBER: SUP 2026-0014
LOCATION: 2451 Summer Avenue
COUNCIL DISTRICT: District 5 and Super District 9
OWNER/APPLICANT: Hazem Shoman
REPRESENTATIVE: Christine Donhardt
REQUEST: Special use permit to allow a car wash
EXISTING ZONING: Commercial Mixed Use – 1 (CMU-1) District
CONCLUSIONS
1. The applicant is requesting approval of a Special Use Permit to allow a car wash within the CMU-1 Commercial Mixed Use zoning
district. The subject property is currently vacant and located along a commercial corridor. The surrounding area contains a mixture
of commercial, single-family, and two-family residential uses. The proposed use is automobile-oriented and does not support the
desired pattern of mixed-use, pedestrian-oriented development for the Summer Avenue corridor.
2. The submitted site plan includes a one-story car wash building, customer parking, vacuum stations, internal drive aisles, sidewalks,
landscaping, and architectural enhancements. While these improvements enhance the appearance and functionality of the site,
they do not overcome the underlying land use concerns associated with a vehicle-oriented use that dedicates substantial site area
to circulation, queuing, and vacuum operations rather than pedestrian-oriented commercial activity.
3. The proposed car wash would also be located in close proximity to existing single -family residences, with approximately 20 feet
separating the commercial and residential property lines, the nearest single -family home located approximately 120 feet from
the principal car wash building, and approximately 72 feet from the nearest outdoor vacuum station. Given the inherently noisy
nature of car wash operations and outdoor vacuum stations, the limited separation between the proposed use and adjacent
residences is incompatible with the surrounding residential neighborhood.
4. On October 6, 2004, the Memphis City Council adopted Ordinance No. 5023, rezoning the subject property from the Employment
(EMP), formerly Light Industrial (I-L), zoning district to the Commercial Mixed Use (CMU-1) zoning district. The rezoning reflected
the City's intent to transition the property from employment/industrial use to a commercial mixed-use development pattern along
the Summer Avenue corridor.
5. The proposed use would impede future redevelopment opportunities by introducing a low-intensity, automobile-oriented use on
a prominent corner lot rather than advancing the long -term vision for a walkable commercial corridor with frontage on both
Summer Avenue and North Hollywood Street.
6. Based on the adopted Memphis 3.0 plan, the proposal is inconsistent with Objective 1.5 – Strengthen Neighborhood Commercial
Districts, specifically Action 1.5.6 – Support the redevelopment and intensification of underutilized commercial properties within
Community Anchors.
7. There are four existing car wash facilities located within the approximately five-mile segment of Summer Avenue between North
Parkway and North White Station Road, indicating that this commercial corridor is already served by multiple similar uses.
8. The granting of this special use permit will cause substantial detriment to the public good, it will substantially impair the intent
and purpose of an adopted plan or the Unified Development Code (UDC), it will be injurious to the neighborhood and the general
welfare, and it will not be in harmony with the purpose and intent of the UDC.
CONSISTENCY WITH MEMPHIS 3.0
This proposal is inconsistent with the Memphis 3.0 General Plan per the land use decision criteria. See further analysis on pages
23-26 of this report.
RECOMMENDATION:
Rejection
Staff Report August 13, 2026
SUP 2026-014 Page 2
2
LOCATION MAP
Subject property located within the pink circle.
SUBJECT PROPERTY
Staff Report August 13, 2026
SUP 2026-014 Page 3
3
PUBLIC NOTICE VICINITY MAP
PUBLIC NOTICE DETAILS
In accordance with Sub-Section 9.3.4A of the Unified Development Code, a notice of public hearing is required
to be mailed and signage posted. A total of 178 notices were mailed on July 10, 2026, see page 30 of this report
for a copy of said notice . Additionally, two signs were posted at the subject property, see page s 34-35 of this
report for a copy of the sign affidavit.
NEIGHBORHOOD MEETING
The meeting was held at 6:00 PM on Thursday, Ju ly 30, 2026, at the Cornerstone Prep. School-Lester Campus
School Cafeteria, 320 Carpenter Street, Memphis, TN 38112 . See pages 32-33 for the neighborhood meeting
summary.
Staff Report August 13, 2026
SUP 2026-014 Page 4
4
AERIAL
Subject property outlined in yellow.
Staff Report August 13, 2026
SUP 2026-014 Page 5
5
ZONING MAP
Subject property highlighted in yellow.
Staff Report August 13, 2026
SUP 2026-014 Page 6
6
LAND USE MAP
Subject property indicated by a pink star.
Staff Report August 13, 2026
SUP 2026-014 Page 7
7
SITE PHOTOS
View of subject property from Summer Avenue.
View of subject property from the intersection (Summer Avenue and N Hollywood Street).
View of subject property from N Hollywood Street.
Staff Report August 13, 2026
SUP 2026-014 Page 8
8
View of subject property from above.
View of subject property from above.
Staff Report August 13, 2026
SUP 2026-014 Page 9
9
SURVEY
Staff Report August 13, 2026
SUP 2026-014 Page 10
10
SURVEY – MAGNIFIED
Staff Report August 13, 2026
SUP 2026-014 Page 11
11
SITE PLAN
Staff Report August 13, 2026
SUP 2026-014 Page 12
12
LANDSCAPE PLAN
Staff Report August 13, 2026
SUP 2026-014 Page 13
13
ELEVATIONS
Staff Report August 13, 2026
SUP 2026-014 Page 14
14
Staff Report August 13, 2026
SUP 2026-014 Page 15
15
CASE REVIEW
Request
The request is a special use permit to allow a car wash.
Approval Criteria
Staff disagrees the approval criteria in regard to special use permits as set out in Section 9.6.9 of the Unified
Development Code are met.
9.6.9 Approval Criteria
No special use permit or planned development shall be approved unless the following findings are made
concerning the application:
9.6.9A The project will not have a substantial or undue adverse effect upon adjacent property, the
character of the neighborhood, traffic conditions, parking, utility facilities and other matters
affecting the public health, safety, and general welfare.
9.6.9B The project will be constructed, arranged and operated so as to be compatible with the
immediate vicinity and not interfere with the development and use of adjacent property in
accordance with the applicable district regulations.
9.6.9C The project will be served adequately by essential public facilities and services such as streets,
parking, drainage, refuse disposal, fire protection and emergency services, water and sewers; or
that the applicant will provide adequately for such services.
9.6.9D The project will not result in the destruction, loss or damage of any feature determined by the
governing bodies to be of significant natural, scenic or historic importance.
9.6.9E The project complies with all additional standards imposed on it by any particular provisions
authorizing such use.
9.6.9F The request will not adversely affect any plans to be considered (see Chapter 1.9), or violate the
character of existing standards for development of the adjacent properties.
9.6.9G The governing bodies may impose conditions to minimize adverse effects on the neighborhood
or on public facilities, and to ensure compatibility of the proposed development with surrounding
properties, uses, and the purpose and intent of this development code.
9.6.9H Any decision to deny a special use permit request to place, construct, or modify personal wireless
service facilities shall be in writing and supported by substantial evidence contained in a written
record, per the Telecommunications Act of 1996, 47 USC 3 32(c)(7)(B)(iii). The review body may
not take into account any environmental or health concerns.
Site Details
Address:
2451 Summer Avenue
Parcel ID:
033001 00011C
Area:
+/-35,283 square feet
Staff Report August 13, 2026
SUP 2026-014 Page 16
16
Description:
The subject property is zoned as CMU- 1. Per the Assessor’s website, the subject property is a vacant lot. T he
surrounding land uses are a mixture of single-family, commercial, and two-family lots. Additionally, this lot has
two street frontages.
Site Zoning History
On October 06, 2004, the Council of the City of Memphis adopted Ordinance Number 5023 to make changes in
the zoning district. See pages 27-29 of this report for the adopted ordinance.
Site Plan Review
The site plan shows the construction of a new car wash on an approximately 0.779 -acre (33,919-square-foot)
parcel located at the intersection of Summer Avenue and North Hollywood Street. The proposed development
includes a one -story car wash building, cust omer parking, vacuum stations, internal drive aisles, sidewalks,
landscaping, lighting, and associated utility improvements. Vehicular access is provided from the existing 16 -
foot-wide public alley along the west property line, with a one-way circulation pattern through the wash tunnel
and vacuum area.
The site plan shows landscaped areas along the Summer Avenue and North Hollywood Street frontages, as well
as landscaped islands throughout the parking lot. The landscape plan includes a variety of canopy trees,
ornamental trees, shrubs, and groundcover, i ncluding Black Gum, Willow Oak, Slender Silhouette Sweetgum,
Natchez Crapemyrtle, Burford Holly, Big Blue Liriope, Daylily, Sweetbay, Wintergreen Boxwood, Taylor Juniper,
and Little Lime Hydrangea. Sidewalks are provided to connect the parking area to the building entrance, and the
plans include site lighting, utility improvements, and stormwater infrastructure.
The building elevations show a maximum building height of approximately 33 feet, 6 inches. Exterior materials
include vertical metal siding, cultured stone veneer, precast concrete accents, decorative metal sunshades, and
sloped metal roofing. The primary elevation is oriented towards Summer Avenue and includes the proposed
wall sign.
Analysis
The applicant is requesting approval of a Special Use Permit to allow a car wash within the CMU -1 Commercial
Mixed Use zoning district. The subject property is currently vacant and located along a commercial corridor. The
surrounding area contains a mixture of commercial, single-family, and two-family residential uses. The proposed
use is automobile -oriented and does not support the desired pattern of mixed -use, pedestrian -oriented
development for the Summer Avenue corridor.
The submitted site plan includes a one-story car wash building, customer parking, vacuum stations, internal
drive aisles, sidewalks, landscaping, and architectural enhancements. While these improvements enhance the
appearance and functionality of the site, they do not overcome the underlying land use concerns associated
with a vehicle-oriented use that dedicates substantial site area to circulation, queuing, and vacuum operations
rather than pedestrian-oriented commercial activity.
The proposed car wash would also be located in close proximity to existing single -family residences, with
approximately 20 feet separating the commercial and residential property lines, the nearest single-family home
located approximately 120 feet from the principal car wash building, and approximately 72 feet from the nearest
Staff Report August 13, 2026
SUP 2026-014 Page 17
17
outdoor vacuum station. Given the inherently noisy nature of car wash operations and outdoor vacuum stations,
the limited separation between the proposed use and adjacent residences is incompatible with the surrounding
residential neighborhood.
On October 6, 2004, the Memphis City Council adopted Ordinance No. 5023, rezoning the subject property from
the Employment (EMP), formerly Light Industrial (I -L), zoning district to the Commercial Mixed Use (CMU -1)
zoning district. The rezoning reflected t he City's intent to transition the property from employment/industrial
use to a commercial mixed-use development pattern along the Summer Avenue corridor.
The proposed use would impede future redevelopment opportunities by introducing a low -intensity,
automobile-oriented use on a prominent corner lot rather than advancing the long -term vision for a walkable
commercial corridor with frontage on both Summer Avenue and North Hollywood Street.
Based on the adopted Memphis 3.0 plan , t he proposal is inconsistent with Objective 1.5 – Strengthen
Neighborhood Commercial Districts, specifically Action 1.5.6 – Support the redevelopment and intensification
of underutilized commercial properties within Community Anchors.
There are four existing car wash facilities located within the approximately five-mile segment of Summer Avenue
between North Parkway and North White Station Road, indicating that this commercial corridor is already
served by multiple similar uses. The existing facilities are located at the following addresses:
• Sunshine Car Wash, 3053 Summer Avenue, Memphis, TN 38112
• Magic Hand Car Wash, 3872 Summer Avenue, Memphis, TN 38122
• Take 5 Car Wash, 4349 Summer Avenue, Memphis, TN 38122
• Jumbo Car Wash, 4952 Summer Avenue, Memphis, TN 38122
The granting of this special use permit will cause substantial detriment to the public good, it will substantially
impair the intent and purpose of an adopted plan or the Unified Development Code (UDC), it will be injurious
to the neighborhood and the general welfare, and it will not be in harmony with the purpose and intent of the
UDC.
RECOMMENDATION
Staff recommends rejection; however, if approved, staff recommends the following conditions:
Conditions
1. Enhanced buffering along the property line adjacent to the alley and residential properties, including
evergreen landscaping and a sight -proof fence or wall, shall be provided subject to administrative review
and approval by the Division of Planning and Development.
2. The applicant shall limit the hours of operation to 8:00 a.m. to 6:00 p.m.
3. All detached signs shall be of the monument style.
4. Vehicular access to Summer Avenue is prohibited.
Staff Report August 13, 2026
SUP 2026-014 Page 18
18
5. The applicant shall submit an Administrative Site Plan Review (ASPR) application that includes a site plan,
landscape plan, building elevations, lighting plan, and photometric plan subject to administrative review
and approval by the Division of Planning and Development.
Staff Report August 13, 2026
SUP 2026-014 Page 19
19
DEPARTMENTAL COMMENTS
The following comments were provided by agencies to which this application was referred:
City Engineer: See pages 20-21.
County Engineer: No comments received.
City Fire Division: See page 22.
County Fire Division: No comments received.
City Real Estate: No comments received.
County Health Department: No comments received.
Shelby County Schools: No comments received.
Construction Code Enforcement: No comments received.
Memphis Light, Gas and Water: No comments received.
Office of Sustainability and Resilience: No comments received.
Office of Comprehensive Planning: See pages 23-26.
Staff Report August 13, 2026
SUP 2026-014 Page 20
20
City Engineer
Basin/Lot/CD: Overton Bayou/ 2-M/HIGH SENSITIVITY/0.81 acres/District 5
Sewer:
1. The availability of City sanitary sewer is unknown at this time. Once the developer has submitted
proposed sewer discharge rates to the City’s Sewer Design Dept, a determination can be made
as to available sewer capacity
2. A sanitary sewer service connection plan is required to be submitted (via 901 portal) to the City
Land Development Office for review and approval.
3. All required design plans and potential traffic control plan must be prepared in accordance with
the City’s Standard Requirements and must be stamped by a Professional Engineer registered in
the State of Tennessee.
4. A Sewer Development fee may be required per the City of Memphis Sewer Use Ordinance.
Roads:
1. The Developer shall be responsible for the repair and/or replacement of all existing curb and
gutter along the frontage of this site as necessary.
2. All existing sidewalks and curb openings along the frontage of this site shall be inspected for ADA
compliance. The developer shall be responsible for any construction, reconstruction, or repair
necessary to meet City standards.
Traffic Control Provisions:
3. The developer shall provide a traffic control plan to the city engineer that shows the phasing for
each street frontage during demolition and construction of curb gutter and sidewalk. Upon
completion of sidewalk and curb and gutter improvements, a minimum 5-foot-wide pedestrian
pathway shall be provided throughout the remainder of the project. In the event that the existing
right of way width does not allow for a 5 -foot clear pedestrian path, an exception may be
considered.
4. Any closure of the right of way shall be time limited to the active demolition and construction of
sidewalks and curb and gutter. Continuous unwarranted closure of the right of way shall not be
allowed for the duration of the project. The developer shall provide on the traffic control plan,
the time needed per phase to complete that portion of the work. Time limits will begin on the
day of closure and will be monitored by the Engineering construction inspectors on the job.
5. The developer’s engineer shall submit a Trip Generation Report that documents the proposed
Staff Report August 13, 2026
SUP 2026-014 Page 21
21
land use, scope and anticipated traffic demand associated with the proposed development. A
detailed Traffic
Impact Study will be required when the accepted Trip Generation Report indicates that the
number for projected trips meets or exceeds the criteria listed in Section 210-Traffic Impact Policy
for Land Development of the City of Memphis Division of Engineeri ng Design and Policy Review
Manual. Any required Traffic Impact Study will need to be formally approved by the City of
Memphis, Traffic Engineering Department.
Curb Cuts/Access:
6. The City Engineer shall approve the design, number, and location of curb cuts.
7. Any existing nonconforming curb cuts shall be modified to meet current City Standards or closed
with curb, gutter, and sidewalk.
8. Will require engineering ASPR.
Drainage:
1. A grading and drainage plan for the site shall be submitted to the City Engineer for review and
approval prior to recording of the final plat.
2. Drainage improvements, including possible on-site detention, shall be provided under a Standard
Subdivision contract in accordance with Unified Development Code and the City of
Memphis/Shelby County Storm Water Management Manual.
3. Drainage data for assessment of on -site detention requirements shall be submitted to the City
Engineer.
4. The following note shall be placed on the final plat of any development requiring on -site storm
water detention facilities: The areas denoted by "Reserved for Storm Water Detention" shall not
be used as a building site or filled without first obtaining written permission from the city and/or
County Engineer. The storm water detention systems located in these areas, except for those
parts located in a public drainage easement, shall be owned and maintained by the property
owner and/or property owners' assoc iation. Such maintenance shall be performed so as to
ensure that the system operates in accordance with the approved plan on file in the City and/or
County Engineer's Office. Such maintenance shall include, but not be limited to removal of
sedimentation, fallen objects, debris and trash, mowing, outlet cleaning, and repair of drainage
structures.
Site Plan Notes:
1. The minimum sign setback from the street right-of-way shall be 15 feet.
Staff Report August 13, 2026
SUP 2026-014 Page 22
22
City Fire Division
1. All design and construction shall comply with the 2021 edition of the International Fire Code with local
amendments and referenced standards.
2. Fire apparatus access shall comply with section 503.
3. Where security gates are installed that affect required fire apparatus access roads, they shall comply with
section 503.6.
4. Fire protection water supplies (including fire hydrants) shall comply with section 507.
5. Where fire apparatus access roads or a water supply for fire protection are required to be installed, such
protection shall be installed and made serviceable prior to and during the time of construction except when
approved alternate methods of protection are provided.
6. IFC 510 In-building two-way emergency responder communication coverage shall be provided in all new and
existing buildings. Buildings and structures that cannot support the required level of coverage shall be
equipped with systems and components to enhance signals and achieve the required level of
communication coverage.
7. A detailed plans review will be conducted by the Memphis Fire Prevention Bureau upon receipt of complete
construction documents. Plans shall be submitted to the Shelby County Office of Code Enforcement.
Staff Report August 13, 2026
SUP 2026-014 Page 23
23
Office of Comprehensive Planning
This summary is being produced in response to the following application to support the Land Use and
Development Services department in their recommendation: SUP 2026-014
Site Address/Location: 2451 Summer Ave
Overlay District/Historic District/Flood Zone: NA
Future Land Use Designation: Anchor Neighborhood-Mix of Building Types (AN-M)
Street Type: Parkway
The applicant is seeking approval for a special use permit to allow a car wash in a Commercial Mixed Use -1
zone.
The following information about the land use designation can be found on pages 76 – 122:
1. Future Land Use Planning Map
Red polygon indicates the application site on the Future Land Use Map.
Staff Report August 13, 2026
SUP 2026-014 Page 24
24
2. Land Use Description/Intent
Anchor Neighborhood-Mix of Building Types (AN-M) are walkable
neighborhoods within a 5 – 10-minute walk of a Community Anchor. These
neighborhoods are made up of a mix of single-unit and multi-unit housing.
Graphic portrayal of AN-M is to the right.
“AN-M” Form & Location Characteristics
ACCELERATE: Primarily detached, single-family house-scale residences of 1-3 stories in height. Attached, house-
scale single-family, duplexes, triplexes and quadplexes of 1 -3 stories in height permitted on parcels within 200
feet of an anchor and at inters ections where the presence of such housing type currently exists. Building -scale
large homes and apartments of 2 -4 stories in height permitted on parcels within 100 feet of an anchor; at
intersections where the presence of such housing type currently exist s at the intersection. Other housing and
commercial types along avenues, boulevards and parkways as identified in the Street Types Map where same
types exist on one or more adjacent parcels.
“AN-M” Zoning Notes
Generally compatible with the following zone districts: RU-2, RU-3, RU-4, R-SD, R-R, MDR, and CMU-1 when
located along avenues, boulevards, and parkways as identified in the Street Types Map, in accordance with
Form and characteristics listed above.
Existing, Adjacent Land Use and Zoning
Existing Land Use and Zoning: Vacant, CMU-1 and EMP
Adjacent Land Use and Zoning: Commercial, Industrial, Single-Family; CMU-1, CMU-3, EMP, R-6
Overall Compatibility: This requested use is not compatible with the land use description/intent, form &
location characteristics, and zoning notes. While the proposed use is compatible with some adjacent land uses,
the broader area is largely inconsistent with the Future Land Use description and intent.
Staff Report August 13, 2026
SUP 2026-014 Page 25
25
3. Degree of Change Map
Red polygon denotes the proposed site in Degree of Change area. The Degree of Change is Accelerate.
4. Degree of Change Description
Accelerate areas rely on a mix of primarily private and philanthropic resources along with some public
resources to intensify the existing pattern of a place.
The proposed application is a private investment. However, it will impede future development activity and be a
barrier to promoting pedestrian-oriented development on Summer Avenue.
5. Objectives/Actions Consistent with Goal 1, Complete, Cohesive, Communities
The requested use is not consistent with Objective 1.5 – Strengthen neighborhood commercial districts, Action
1.5.6 – Support the redevelopment and intensification of underutilized commercial properties within
Community Anchors. The proposed use does not strengthen the neighborhood commercial distric, as it
impedes the desired walkable character of development.
6. Pertinent Sections of Memphis 3.0 that Address Land Use Recommendations
NA
Consistency Analysis Summary
The applicant is seeking approval for a special use permit to allow a car wash in a Commercial Mixed Use -1
zone.
Staff Report August 13, 2026
SUP 2026-014 Page 26
26
This requested use is not compatible with the land use description/intent, form & location characteristics, and
zoning notes. While the proposed use is compatible with some adjacent land uses, the broader area is largely
inconsistent with the Future Land Use description and intent.
The proposed application is a private investment. However, it will impede future development activity and be a
barrier to promoting pedestrian-oriented development on Summer Avenue.
The requested use is not consistent with Objective 1.5 – Strengthen neighborhood commercial districts, Action
1.5.6 – Support the redevelopment and intensification of underutilized commercial properties within
Community Anchors. The proposed use does not strengthen the neighborhood commercial district, as it
impedes the desired walkable character of development.
Based on the information provided, the proposal is NOT CONSISTENT with the Memphis 3.0 Comprehensive
Plan.
Staff Report August 13, 2026
SUP 2026-014 Page 27
27
ZONING ORDINANCE #5023 (Z 2003-122)
Staff Report August 13, 2026
SUP 2026-014 Page 28
28
Staff Report August 13, 2026
SUP 2026-014 Page 29
29
Staff Report August 13, 2026
SUP 2026-014 Page 30
30
MAILED PUBLIC NOTICE
Staff Report August 13, 2026
SUP 2026-014 Page 31
31
NEIGHBORHOOD MEETING NOTICE
Staff Report August 13, 2026
SUP 2026-014 Page 32
32
NEIGHBORHOOD MEETING SUMMARY
Staff Report August 13, 2026
SUP 2026-014 Page 33
33
Staff Report August 13, 2026
SUP 2026-014 Page 34
34
SIGN AFFIDAVIT
Staff Report August 13, 2026
SUP 2026-014 Page 35
35
Staff Report August 13, 2026
SUP 2026-014 Page 36
36
APPLICATION
Staff Report August 13, 2026
SUP 2026-014 Page 37
37
Staff Report August 13, 2026
SUP 2026-014 Page 38
38
Staff Report August 13, 2026
SUP 2026-014 Page 39
39
OWNER AFFIDAVIT
Staff Report August 13, 2026
SUP 2026-014 Page 40
40
LETTER OF INTENT
Staff Report August 13, 2026
SUP 2026-014 Page 41
41
LETTERS RECEIVED
One letter of opposition and one letter of support were received at the time of completion of this report and
have subsequently been attached.
Staff Report August 13, 2026
SUP 2026-014 Page 42
42
OPPOSITION
Staff Report August 13, 2026
SUP 2026-014 Page 43
43
Staff Report August 13, 2026
SUP 2026-014 Page 44
44
Staff Report August 13, 2026
SUP 2026-014 Page 45
45
Staff Report August 13, 2026
SUP 2026-014 Page 46
46
Staff Report August 13, 2026
SUP 2026-014 Page 47
47
Staff Report August 13, 2026
SUP 2026-014 Page 48
48
Staff Report August 13, 2026
SUP 2026-014 Page 49
49
SUPPORT
East Service Center: 6465 Mullins Station Rd; Memphis,
Tennessee
38134
Downtown Service Center: 125 N. Main Street;
Memphis, Tennessee 38103
website: www.develop901.com
Memphis and Shelby County Division of
Planning and Development
Record Summary for Special Use Permit
Record Detail Information
Record T
ype: Special Use Permit Record Status: Pending
Opened Date: July 2, 2026
Record Number: SUP 2026-014
Record Name: Shine & Roll Car Wash
Expiration Date:
Description of Work: On behalf of developer Shine & Roll, we are submitting the enclosed Special Use
Permit application for the referenced site. The site is currently a vacant lot split zoned EMP and CMU-1.
A vehicle wash establishment is allowed in EMP but requires SUP for CMU-1 thus we are seeking a
special use permit for the whole site. The entry point will honor the existing curb cut on Hollywood.
Parent Record Number:
Address:
2451 SUMMER AVE, MEMPHIS 38112
Owner Information
Primary Owner Name
Owner
Address Owner Phone
Y PINCKNEY PARNTERS LLC
272 COURT AVE, MEMPHIS, TN 38103
Parcel Information
033001 00011C
Data Fields
PREAPPLICA
TION MEETING
Name of DPD Planner Lucas-Chloe-Alexis
Date of Meeting 07/01/2026
Pre-application Meeting Type Email
GENERAL PROJECT INFORMATION
Application Type New Special Use Permit (SUP)
List any relevant former Docket / Case
Number(s) related to previous applications on
-
Page 1 of 4 SUP 2026-014
GENERAL PROJECT INFORMATION
this site
Is this application in response to a citation, stop
work order, or zoning letter
No
If yes, please provide a copy of the citation, stop
work order, and/or zoning letter along with any
other relevant information
-
APPROV
AL CRITERIA
A) The project will not have a substantial or
undue adverse effect upon adjacent property, the
character of the neighborhood, traffic conditions,
parking, utility facilities and other matters
affecting the public health, safety, and general
welfare
Half of the subject property is zoned EMP which
allows for a vehicle wash establishment, the other
half requires a SUP. The property to the north and
east are convenience stores with gas pumps and
catty-corner is a self-serve laundromat. This project
will not adversely affect the neighborhood.
B) The project will be constructed, arranged and
operated so as to be compatible with the
immediate vicinity and not interfere with the
development and use of adjacent property in
accordance with the applicable district
regulations
Correct.
UDC Sub-Section 9.6.9C The area has all the public facilities needed for this
use.
UDC Sub-Section 9.6.9D No known natural, scenic or historical features are
known to exist on this site.
UDC Sub-Section 9.6.9E The project complies with UDC standards.
UDC Sub-Section 9.6.9F The project compiles with building and zoning code
and will not cause violations.
GIS INFORMATION
Case Layer BOA1934-013-CI, , , Z03-122/Bing
Central Business Improvement District No
Class C
Downtown Fire District No
Historic District -
Land Use VACANT
Municipality MEMPHIS
Overlay/Special Purpose District -
Zoning CMU-1
State Route 1
Lot -
Subdivision -
Planned Development District -
Wellhead Protection Overlay District No
County Commission District -
City Council District -
City Council Super District -
Page 2 of 4 SUP 2026-014
Contact Information
HAZEM SHOMAN
-
APPLICANT
Name
Address
Phone
Contact Type
CHRIS CRAWFORD
(561)212-3364
ARCHITECT
/ ENGINEER /
SURVEYOR
Name
Address
Phone
Contact Type
CHRISTINE DONHARDT
6800 POPLAR
AVE,
(901)761-2016
MANAGER
Name
Address
Phone
Contact Type
WILLIAM TOWNSEND
272 COUR
T AVE, MEMPHIS, TN, MEMPHIS, TN, 38103
(901)761-2016
PROPERTY OWNER OF
RECORD
Name
Address
Phone
Contact Type
MIKE DAVIS
(901)761-2016
REPRESENT ATIVE
Name
Address
Phone
Contact Type
Fee Information
Date
AssessedBalanceStatusFeesQuantityFee ItemInvoice #
07/02/20260.00INVOICED500.001Special Use Permit Fee -
5 acres or less (Base Fee)
1743193
07/02/20260.00INVOICED13.001Credit Card Use Fee (.026
x fee)
1743193
Total Fee Invoiced: $513.00 Total Balance: $0.00
Payment Information
Payment
Amount Method of Payment
Credit Card$513.00
Page 3 of 4 SUP 2026-014
Page 4 of 4 SUP 2026-014
July 2, 2026
Mr. Jeffrey Penzes
Zoning Administrator
Division of Planning and Development
125 N. Main, Ste. 477
Memphis, TN 38103
RE: Vehicle Wash Establishment, 2451 Summer Ave
Dear Mr. Penzes:
On behalf of developer Shine & Roll, we are submitting the enclosed Special Use Permit application for
the referenced site. The site is currently a vacant lot split zoned EMP and CMU -1. A vehicle wash
establishment is allowed in EMP but requires SUP for CMU-1 thus we are seeking a special use permit for
the whole site. The entry point will honor the existing curb cut on Hollywood.
Your consideration of this application is greatly appreciated.
Sincerely,
Mike Davis, R.L.A.
Principal
26-0093TRF JOB NO.:
BOUNDARY AND TOPOGRAPHIC SURVEY Sht 1 of 2
FOR:
SHEET TITLE:
CE/DS
06/15/26
1"=20'
SHEET NO.:
PREPARED BY:
ISSUE DATE:
FIELD DATE:
SCALE:
PROJECT:SEAL
SURVEY OF
MEMPHIS, SHELBY COUNTY, TENNESSEE 38112
2451 SUMMER AVENUE
SHINE & ROLL #4
06/16/26
THIS SURVEY WAS PREPARED BY:
The Reaves Firm Incorporated
6800 POPLAR AVENUE, SUITE 101
MEMPHIS, TN 38138
901-761-2016
UNDER THE DIRECT SUPERVISION OF:
MICHAEL K. FRYE, TN RLS# 807
SUMMER AVENUE
(74' PUBLIC R.O.W.)
NORTH HOLLYWOOD STREET
(71' PUBLIC R.O.W.)
16' WIDE PUBLIC ALLEY
CL
CL
FOREST AVENUE
NOTE:
PROPERTY CORNER MONUMENTS WILL BE SET AND
DESCRIPTION UPDATED ONCE SURVEYOR INSTALLS
MARKERS.
SURVEYOR'S CERTIFICATE
THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON
WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE STATE OF
TENNESSEE LAND SURVEYORS STANDARDS. THIS IS A CATEGORY "I"
SURVEY AND THE RATIO OF PRECISION OF THE UNADJUSTED SURVEY
IS 1:10,000 OR GREATER.
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
“ ”
26-0093TRF JOB NO.:
Sht 2 of 2
FOR:
SHEET TITLE:
CE/DS
06/15/26
1"=20'
SHEET NO.:
PREPARED BY:
ISSUE DATE:
FIELD DATE:
SCALE:
PROJECT:SEAL
SURVEY OF
MEMPHIS, SHELBY COUNTY, TENNESSEE 38112
2451 SUMMER AVENUE
SHINE & ROLL #4
06/16/26
THIS SURVEY WAS PREPARED BY:
The Reaves Firm Incorporated
6800 POPLAR AVENUE, SUITE 101
MEMPHIS, TN 38138
901-761-2016
UNDER THE DIRECT SUPERVISION OF:
MICHAEL K. FRYE, TN RLS# 807
”
”
”
”
”
”
BOUNDARY AND TOPOGRAPHIC SURVEY
SURVEYOR'S CERTIFICATE
THIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON
WHICH IT IS BASED WERE MADE IN ACCORDANCE WITH THE STATE OF
TENNESSEE LAND SURVEYORS STANDARDS. THIS IS A CATEGORY "I"
SURVEY AND THE RATIO OF PRECISION OF THE UNADJUSTED SURVEY
IS 1:10,000 OR GREATER.
FE
FE
FE
NEW CAR WASH BUILDING
TOTAL ENCLOSED AREA: 2,965 SQ. FT.
MAXIMUM HEIGHT: + 35'-0" EXIT LANE
DUMPSTER
ENCLOSURE
VACUUM
ENCLOSURE
PAY LANE 1 PAY LANE 2
LOADING
LANE
TUNNEL
ENTRY
EXIT
TUNNEL
WALKWAYWALKWAY
WALKWAY
8 FREE-VACUUM SPACES
8 FREE-VACUUM SPACES (12'x19' TYP)
6 FREE-VACUUM SPACES
SPACE (10'x25')
1 EMPLOYEE SPACES (10'x25')
2 EMPLOYEE
ENTRY &
EXIT
LANDSCAPE
AREA LANDSCAPE
AREA
LANDSCAPE
AREA
LANDSCAPE
AREA
U.G. OIL/WATER (3) U.G. WATER RECLAIM TANKSSEPARATOR
2 STACKING LANES
(12 VEHICLE CAP.)
DIRECT.
SIGN
MONUMENT
I.D. SIGN
LANDSCAPE
ISLAND
LANDSCAPE
ISLAND
LANDSCAPE
ISLAND
LANDSCAPE PLANTER
LANDSCAPE PLANTER
LANDSCAPE PLANTER
LANDSCAPE
AREA
LANDSCAPE
AREA
LANDSCAPE
AREA
LANDSCAPE
AREA
LANDSCAPE
AREA
BI-PASS
EXIT LANE
EXISTING COMMERCIAL BUILDING
LANDSCAPE
AREA
POLE
FLAG
ELECT.
POLE ELECT.
POLE
ELECT.
POLE
16' WIDE PUBLIC ALLEY
FOREST AVENUE
NORTH HOLLYWOOD STREET
SUMMER AVENUE
(74' R.O.W.)
(71' R.O.W.)
FENCE
FENCE
FENCE
A1.0
SITE
PLAN
Seal:
Sheet:
Drawn By:
Date:
Sheet Description:
Project Number:
REVISIONS BY
ARC-TECH-CON INTERNATIONAL
ARC-TECH-CON INTERNATIONALc
BOCA RATON, FLORIDA 33487
7801 N. FEDERAL HIGHWAY, BUILDING 23-103
RA, NCARB
PHONE: (561) 212-3364 / (856) 304-2739
E-MAIL: Arctechint@gmail.com / brian@k4designgroup.com
BRIAN K. KUNI
TENNESSEE ARCHITECT: AR103809
ARCHITECTS
WRITTEN DIMENSIONS ON THESE
DRAWINGS SHALL HAVE PRECEDENCE
OVER SCALED DIMENSIONS. ANY
ERROR OR OMISSION ON THESE
CONSTRUCTION DOCUMENTS DO NOT
RELIEVE GENERAL CONTRACTORS,
SUBCONTRACTORS, SUPPLIERS OR
MANUFACTURERS FROM ANY
RESPONSIBILITY OF COMPLYING
WITH CODE OR JURISDICTIONAL
AUTHORITY REQUIREMENTS. ANY
DISCREPANCIES OR ADDITIONAL
REQUIREMENTS MUST BE REPORTED
TO THE ARCHITECT IMMEDIATELY
FOR APPROPRIATE ACTION. DESIGN
COPYRIGHTS BY K4 ARCHITECTS AND
ARC-TECH-CON INTERNATIONAL -
UNAUTHORIZED REPRODUCTION,
COPYING, OR ANY OTHER USE OF
THESE DRAWINGS IS PROHIBITED.
K4 ARCHITECTSc
New Express Car Wash for
SHINE & ROLL CAR WASH
202607.01
JULY 1, 2026
CPC / NSY
New Express Car Wash for
2451 Summer Avenue
SHINE & ROLL CAR WASH
City of Memphis, Tennessee
LOCATION MAP (nts)
PROPOSED SITE PLAN
SCALE: 1" = 20.00'
Memphis City Council
Summary Sheet
PD 26-04
RESOLUTION PURSUANT TO CHAPTER 9.6 OF THE MEMPHIS AND SHELB Y COUNTY UNIFIE D
DEVELOPMENT CODE APPROVING A PLANNED D EVELOPMENT AT THE SUBJECT PROPERTY
LOCATED AT 0 & 3260 HOLMES RD, KNOWN AS CASE NUMBER PD 26-04
• This item is a r esolution with conditions to allow a mixed-use planned
development with R-6 (residential / single-family), CMU-2 (commercial), and EMP
(industrial / truck Stop) zoning uses; and
• This resolution, if approved with conditions, will supersede the existing zoning for
this property; and
• The item may require future public improvement contracts.
1
LAND USE CONTROL BOARD RECOMMENDATION
At its regular meeting on Thursday, August 13, 2026, the Memphis and Shelby County Land Use Control
Board held a public hearing on the following application:
CASE NUMBER: PD 26-04
DEVELOPMENT: Holmes Tchulahoma Planned Development
LOCATION: 0 & 3260 Holmes Rd
COUNCIL DISTRICT(S): District 3 and Super District 8
OWNER/APPLICANT: New Development LLC
REPRESENTATIVE: David Gean Bray, The Bray Firm
REQUEST: Mixed-use planned development to allow uses in conjunction with
R-6 (residential / single -family), CMU -2 (commercial), and EMP
(industrial / truck Stop) zoning
EXISTING ZONING: Residential Urban – 3 (RU-3) & Commercial Mixed Use – 2 (CMU-2)
AREA: +/-34.78 acres
The following spoke in support: Thomas Hewgley & Aaron Robinson
The following spoke in opposition: None
The Land Use Control Board reviewed the application and the staff report. A motion was made and
seconded to recommend approval with conditions.
The motion failed by a unanimous vote of 3-5 on the regular agenda.
Respectfully,
Nabanita Nira
Planner II
Land Use and Development Services
Division of Planning and Development
Cc: Committee Members
File
2
PD 26-04
CONDITIONS
Outline Plan Conditions
I. USES PERMITTED:
A. AREA A - R-6
AREA B - CMU-2
AREA C – CMU-2 with following exception:
a. Convenience store with gas pumps
b. Truck Stop without tractor trailer parking
II. BULK REGULATIONS:
A. AREA A - The bulk regulations of the R-6 zoning district shall apply.
B. AREA B - The bulk regulations of the CMU-2 zoning district shall apply.
C. AREA C - The bulk regulations of the CMU-2 zoning district shall apply.
III. ACCESS AND CIRCULATION:
A. The City Engineer shall approve the design, number and location of curb cuts.
B. Any existing nonconforming curb cuts shall be modified to meet current City/ County Standards
or closed with curb, gutter and sidewalk.
C. Provide internal circulation between adjacent phases, lots, and sections. Common ingress/
egress easements shall be shown on the final plats.
IV. LANDSCAPING, SCREENING, AND LIGHTING:
A. An NOI as required by the Tree Ordinance shall be filed with the Division of Planning and
Development at least 10 days prior to the removal of any tree that is 10 inches or greater in
diameter.
B. Any dumpster or accessory buildings shall be compatible with the main building.
C. Any HVAC equipment or utility meters shall be screened through the use of fencing or
landscaping. If roof mounted, the equipment shall be screened through the use of an
architectural feature such as a parapet.
D. The required landscaping shall be exclusive of and in addition to any required easements.
E. A detailed landscaping plan shall be submitted with the final plat subject to the approval of the
Division of Planning and Development. If the City Engineer's Office requires detention on this
property that requires landscape to revised, no use Occupancy Permit shall be issued until a
detailed landscaping plan has been approved by the DPD.
F. All light poles shall be limited to a maximum of 35 feet in height.
G. All lighting shall be designed to direct light straight down and not to trespass onto the adjoining
properties. A detailed lighting plan showing the location of the poles and other lighting fixtures
and the photometric analysis shall be submitted with the final plat, subject to the review and
approval of the DPD.
V. Site Plan Review:
A site plan shall be submitted for the review, comment and recommendation of the Division of
Planning and Development (DPD) and appropriate City Agencies prior to the approval of any plan.
3
However, if there is a disagreement regarding the intention of any of the above conditions, either
party may appeal to the Land Use Control Board and If necessary, the Memphis City Council.
A. The Site plan shall include:
1. The exact location and dimensions including height of all buildings.
2. The number, location, and dimensions of parking spaces within proposed structures/ lots.
3. A detailed landscaping plan including the species and diameter of any new plants.
4. A lighting plan showing the location of the freestanding poles, the type of fixtures and if
required by DPD, photometric analysis that shows the trespass of light onto adjacent
residential properties is no great than 1.0 candle foot at the property line.
B. The site plan shall be reviewed based on the following criteria:
1. Conformance with the Outline Plan Conditions.
2. Compatibility with existing properties surrounding the site as well as a compatible internal
arrangement of uses.
3. Elements of design such as building orientation, building mass and height, building
materials, setback, access, parking and internal circulation, landscaping, and lighting.
4. Adequate access shall be provided to the site as determined by the City Engineer.
VI. A final plan shall be filed within five (5) years of the approval of the Outline Plan by the Memphis
City Council. The Land Use Control Board may grant extensions at the request of the applicant.
VII. Any final plan shall include the following:
A. The Outline Plan conditions.
B. A standard subdivision contract as defined by the Subdivision Regulations for any needed
public improvements.
C. The exact location and dimensions including height of all buildings (with elevations) or
buildable areas, parking areas, drives, and required landscaping,
D. The number of parking spaces
E. The location and ownership, whether public or private, of any easement.
F. The following note shall be placed on the final plat of any development requiring on-site storm
water detention facilities: The areas denoted by “Reserved for Storm Water Detention" shall
not be used as a building site or filled without first obtaining wri tten permission from the City
Engineer. The storm water detention located in these areas, except for those parts located in
a public drainage easement, shall be owned and maintained by the property owner and/or
owners' association. Such maintenance shall be performed so as to ensure the system operates
in accordance with the approved plan on file in the City Engineer's Office. Such maintenance
shall include, but not be limited to: removal of sedimentation, fallen objects, debris and trash,
mowing, outlet cleaning, and repair of drainage structures.
4
CONCEPT PLAN
RESOLUTION PURSUANT TO CHAPTER 9.6 OF THE MEMPHIS AND SHELBY COUNTY
UNIFIED DEVELOPMENT CODE APPROVING A P LANNED DEVELOPMENT AT THE
SUBJECT PROPERTY LOCATED AT 0 & 3260 HOLMES RD, KNOWN AS CASE NUMBER PD
26-04
WHEREAS, Chapter 9.6 of the Memphis and Shelby County Unified Development Code, being a
section of the Joint Ordinance Resolution No. 5367, dated August 10, 2010, authorizes the Council of the
City of Memphis to grant a planned development for certain stated purposes in the various zoning districts;
and
WHEREAS, the New Development LLC filed an application with the Memphis and Shelby County
Division of Planning and Development to allow a mixed-use planned development in conjunction with R-
6 (residential / single-family), CMU-2 (commercial), and EMP (industrial / truck Stop) zoning uses; and
WHEREAS, the Division of Planning and Development has received and reviewed the application
in accordance with procedures, objectives and standards for planned developments as set forth in Chapter
9.6 with regard to the proposed development's impacts upon surrounding properties, availability of public
facilities, both external and internal circulation, land use compatibility, and that the design and amenities
are consistent with the public interest; and has submitted its findings and recommendation subject to outline
plan conditions concerning the above considerations to the Memphis and Shelby County Land Use Control
Board; and
WHEREAS, a public hearing in relation thereto was held before the Memphis and Shelby County
Land Use Control Board on August 13, 2026 , and said Board has submitted its findings and
recommendation subject to outline plan conditions concerning the above considerations to the Council of
the City of Memphis; and
WHEREAS, the Council of the City of Memphis has reviewed the aforementioned application
pursuant to Tennessee Code Annotated Section 13-4- 202(B)(2)(B)(iii) and has determined that said
development is consistent with the Memphis 3.0 General Plan; and
WHEREAS, the Council of the City of Memphis has reviewed the recommendation of the Land
Use Control Board and the report and recommendation of the Division of Planning and Development and
has determined that said development meets the objectives, standards and criteria for a special use permit,
and said development is consistent with the public interests.
NOW, THEREFORE, BE IT RESOLVED, BY THE COUNCIL OF THE CITY OF
MEMPHIS, that, pursuant to Chapter 9.6 of the Memphis and Shelby County Unified Development Code,
a planned development is hereby granted in accordance with the attached outline plan conditions.
BE IT FURTHER RESOLVED , t hat the requirements of said aforementioned clause of the
Unified Development Code shall be deemed to have been complied with; that the outline plan shall bind
the applicant, owner, mortgagee, if any, and the legislative body with respect to the contents of said plan;
and the applicant and/or owner may file a final plan in accordance with said outline plan and the provisions
of Section 9.6.11 of the Unified Development Code.
OUTLINE PLAN CONDITIONS
I. USES PERMITTED:
A. AREA A - R-6
AREA B - CMU-2
AREA C – CMU-2 with following exception:
a. Convenience store with gas pumps
b. Truck Stop without tractor trailer parking
II. BULK REGULATIONS:
A. AREA A - The bulk regulations of the R-6 zoning district shall apply.
B. AREA B - The bulk regulations of the CMU-2 zoning district shall apply.
C. AREA C - The bulk regulations of the CMU-2 zoning district shall apply.
III. ACCESS AND CIRCULATION:
A. The City Engineer shall approve the design, number and location of curb cuts.
B. Any existing nonconforming curb cuts shall be modified to meet current City/ County Standards
or closed with curb, gutter and sidewalk.
C. Provide internal circulation between adjacent phases, lots, and sections. Common ingress/ egress
easements shall be shown on the final plats.
IV. LANDSCAPING, SCREENING, AND LIGHTING:
A. An NOI as required by the Tree Ordinance shall be filed with the Division of Planning and
Development at least 10 days prior to the removal of any tree that is 10 inches or greater in
diameter.
B. Any dumpster or accessory buildings shall be compatible with the main building.
C. Any HVAC equipment or utility meters shall be screened through the use of fencing or
landscaping. If roof mounted, the equipment shall be screened through the use of an architectural
feature such as a parapet.
D. The required landscaping shall be exclusive of and in addition to any required easements.
E. A detailed landscaping plan shall be submitted with the final plat subject to the approval of the
Division of Planning and Development. If the City Engineer's Office requires detention on this
property that requires landscape to revised, no use Occupancy Permit shall be issued until a
detailed landscaping plan has been approved by the DPD.
F. All light poles shall be limited to a maximum of 35 feet in height.
G. All lighting shall be designed to direct light straight down and not to trespass onto the adjoining
properties. A detailed lighting plan showing the location of the poles and other lighting fixtures
and the photometric analysis shall be submitted with the final plat, subject to the review and
approval of the DPD.
V. Site Plan Review:
A site plan shall be submitted for the review, comment and recommendation of the Division of
Planning and Development (DPD) and appropriate City Agencies prior to the approval of any plan.
However, if there is a disagreement regarding the intention of any of the above conditions, either
party may appeal to the Land Use Control Board and If necessary, the Memphis City Council.
A. The Site plan shall include:
1. The exact location and dimensions including height of all buildings.
2. The number, location, and dimensions of parking spaces within proposed structures/ lots.
3. A detailed landscaping plan including the species and diameter of any new plants.
4. A lighting plan showing the location of the freestanding poles, the type of fixtures and if
required by DPD, photometric analysis that shows the trespass of light onto adjacent
residential properties is no great than 1.0 candle foot at the property line.
B. The site plan shall be reviewed based on the following criteria:
1. Conformance with the Outline Plan Conditions.
2. Compatibility with existing properties surrounding the site as well as a compatible internal
arrangement of uses.
3. Elements of design such as building orientation, building mass and height, building
materials, setback, access, parking and internal circulation, landscaping, and lighting.
4. Adequate access shall be provided to the site as determined by the City Engineer.
VI. A final plan shall be filed within five (5) years of the approval of the Outline Plan by the Memphis
City Council. The Land Use Control Board may grant extensions at the request of the applicant.
VII. Any final plan shall include the following:
A. The Outline Plan conditions.
B. A standard subdivision contract as defined by the Subdivision Regulations for any needed public
improvements.
C. The exact location and dimensions including height of all buildings ( with elevations) or
buildable areas, parking areas, drives, and required landscaping,
D. The number of parking spaces
E. The location and ownership, whether public or private, of any easement.
F. The following note shall be placed on the final plat of any development requiring on-site storm
water detention facilities: The areas denoted by “Reserved for Storm Water Detention" shall not
be used as a building site or filled without first obtaining wri tten permission from the City
Engineer. The storm water detention located in these areas, except for those parts located in a
public drainage easement, shall be owned and maintained by the property owner and/or owners'
association. Such maintenance shall be performed so as to ensure the system operates in
accordance with the approved plan on file in the City Engineer's Office. Such maintenance shall
include, but not be limited to: removal of sedimentation, fallen objects, debris and trash,
mowing, outlet cleaning, and repair of drainage structures.
CONCEPT PLAN
ATTEST:
CC: Division of Planning and Development
– Land Use and Development Services
– Office of Construction Enforcement
Staff Writer: Nabanita Nira E-mail: nabanita.nira@memphistn.gov
AGENDA ITEM: 4 L.U.C.B. MEETING: August 13, 2026
CASE NUMBER: PD 2026-004
DEVELOPMENT: Holmes Tchulahoma Planned Development
LOCATION: 3260 & 0 Holmes Rd
COUNCIL DISTRICT: District 3 and Super District 8
OWNER/APPLICANT: New Development LLC
REPRESENTATIVE: David Gean Bray, The Bray Firm
REQUEST: Mixed-use planned development to allow uses in conjunction with R -6 (residential /
single-family), CMU-2 (commercial), and EMP (industrial / truck Stop) zoning
EXISTING ZONING: Residential Urban – 3 (RU-3) & Commercial Mixed Use – 2 (CMU-2)
CONCLUSIONS
1. The subject property is currently vacant and the proposed residential and commercial uses for Area A and B are allowed
by right. However, the proposed use for Area C, truck stop and convenience store with gas pumps are not allowed in CMU-
2 zoning district.
2. The applicant previously submitted a rezoning from CMU -2 to EMP application (Z 2025 -007) at the subject property and
withdrawn it before the LUCB meeting.
3. The UDC intends planned development to promote higher -quality environmental design, appropriate locations for
commercial or industrial activities, and consistency with Memphis 3.0. A planned development should not be functioned
to place an intensive use in a district where that use would otherwise be prohibited.
4. The proposed planned development does not demonstrate that it would produce a higher quality environment beyond
those achievable under current conventional zoning. Other than the truck stop / gas station, residential and commercial
developments are permitted by the current zoning. The commercial shopping plaza is already allowed per the existing
CMU-2 zoning district, and the single -family detached houses are permitted use in RU -3 by subdividing the lots. The
principal benefit of the request appears to be the introduction of a truck stop.
5. Also, according to the UDC, while reviewing a Special Use Permit application for convenience stores with gas pumps or gas
stations in CMU-2 district, the Land Use Control Board and governing body must consider the proposed facility’s proximity
to other gas stations and convenience stores with gas pumps, as well as to single -family residential zoning districts. See
page 7 of this report that demonstrates the proximity to the single -family residential in the vicinity. Note that a planned
development is approved through the issuance of a special use permit to allow for flexible and creative land design.
6. The staff received three letters of opposition, see pages 35-36 of this report.
7. The project will have a substantial or undue adverse effect upon adjacent property, the character of the neighborhood,
traffic conditions, parking, utility facilities and other matters affecting the public health, safety, and general welfare.
CONSISTENCY WITH MEMPHIS 3.0
This proposal is inconsistent with the Memphis 3.0 General Plan per the land use decision criteria. See further
analysis on pages 23-25 of this report.
RECOMMENDATION:
Rejection
Staff Report August 13, 2026
PD 2026-004 Page 2
2
LOCATION MAP
Subject property located within the pink circle
SUBJECT PROPERTY
Staff Report August 13, 2026
PD 2026-004 Page 3
3
PUBLIC NOTICE VICINITY MAP
Subject property highlighted in yellow
PUBLIC NOTICE DETAILS
In accordance with Sub-Section 9.3.4A of the Unified Development Code, a notice of public hearing is required
to be mailed and signage posted. A total of 166 notices were mailed on June 16, 2026, see page 26 of this report
for a copy of said notice. Additionally, two signs were posted at the subject property, see page s 27-28 of this
report for a copy of the sign affidavit.
NEIGHBORHOOD MEETING
The meeting was held at 5:00 PM on Tuesday, June 23, 2026, at the Whitehaven Branch Library, 4120 Millbranch
Road.
Staff Report August 13, 2026
PD 2026-004 Page 4
4
AERIAL
Subject property outlined in yellow, imagery from 2023
Staff Report August 13, 2026
PD 2026-004 Page 5
5
ZONING MAP
Subject property highlighted in yellow
Staff Report August 13, 2026
PD 2026-004 Page 6
6
LAND USE MAP
Subject property indicated by a pink star
Staff Report August 13, 2026
PD 2026-004 Page 7
7
LAND USE WITHIN QUARTER MILE (1/4) & HALF MILE (1/2)
Quarter mile (1/4) radius of the subject property highlighted in green
Half mile (1/2) radius of the subject property highlighted in green
Staff Report August 13, 2026
PD 2026-004 Page 8
8
SITE PHOTOS
View of subject property from East Holmes Rd and Tchulahoma Rd looking northwest
View of subject property from E Holmes Rd looking northeast
Staff Report August 13, 2026
PD 2026-004 Page 9
9
View of subject property from Tchulahoma Rd looking southeast
Staff Report August 13, 2026
PD 2026-004 Page 10
10
CONCEPT PLAN
Staff Report August 13, 2026
PD 2026-004 Page 11
11
CONCEPT PLAN – MAGNIFIED
Staff Report August 13, 2026
PD 2026-004 Page 12
12
CASE REVIEW
Request
The request is a mixed-use planned development to allow uses in conjunction with R -6 (residential / single -
family), CMU-2 (commercial), and EMP (industrial /truck stop) zoning.
Applicability
Staff disagrees the applicability standards and criteria as set out in Section 4.10.2 of the Unified Development
Code are or will be met.
4.10.2 Applicability
The governing bodies may, upon proper application, grant a special use permit for a planned development (see
Chapter 9.6) for a tract of any size within the City or for tracts of at least three acres in unincorporated Shelby
County to facilitate the use of flexible techniques of land development and site design, by providing relief from
district requirements designed for conventional developments, and may establish standards and procedures for
planned developments in order to obtain one or more of the following objectives:
A. Environmental design in the development of land that is of a higher quality than is possible under the
regulations otherwise applicable to the property.
B. Diversification in the uses permitted and variation in the relationship of uses, structures, open space and
height of structures in developments intended as cohesive, unified projects.
C. Functional and beneficial uses of open space areas.
D. Preservation of natural features of a development site.
E. Creation of a safe and desirable living environment for residential areas characterized by a unified
building and site development program.
F. Rational and economic development in relation to public services.
G. Efficient and effective traffic circulation, both within and adjacent to the development site, that supports
or enhances the approved transportation network.
H. Creation of a variety of housing compatible with surrounding neighborhoods to provide a greater choice
of types of environment and living units.
I. Revitalization of established commercial centers of integrated design to order to encourage the
rehabilitation of such centers in order to meet current market preferences.
J. Provision in attractive and appropriate locations for business and manufacturing uses in well -designed
buildings and provision of opportunities for employment closer to residence with a reduction in travel
time from home to work.
K. Consistency with the Memphis 3.0 General Plan.
General Provisions
Staff disagrees the general provisions standards and criteria as set out in Section 4.10.3 of the Unified
Development Code are or will be met.
4.10.3 General Provisions
The governing bodies may grant a special use permit for a planned development which modifies the applicable
district regulations and other regulations of this development code upon written findings and recommendations
of the Land Use Control Board and the Zoning Administrator which shall be forwarded pursuant to provisions
contained in this Chapter.
A. The proposed development will not unduly injure or damage the use, value and enjoyment of surrounding
Staff Report August 13, 2026
PD 2026-004 Page 13
13
property nor unduly hinder or prevent the development of surrounding property in accordance with the
current development policies and plans of the City and County.
B. An approved water supply, community waste water treatment and disposal, and storm water drainage
facilities that are adequate to serve the proposed development have been or will be provided concurrent
with the development.
C. The location and arrangement of the structures, parking areas, walks, lighting and other service facilities
shall be compatible with the surrounding land uses, and any part of the proposed development not used
for structures, parking and loading areas or access way shall be landscaped or otherwise improved except
where natural features are such as to justify preservation.
D. Any modification of the district standards that would otherwise be applicable to the site are warranted
by the design of the outline plan and the amenities incorporated therein, and are not inconsistent with
the public interest.
E. Homeowners’ associations or some other responsible party shall be required to maintain any and all
common open space and/or common elements.
F. Lots of record are created with the recording of a planned development final plan.
Residential Criteria
Staff disagrees the additional planned residential development criteria as set out in Section 4.10.4 of the Unified
Development Code are or will be met.
4.10.4 Planned Residential Developments
In addition to the standards and criteria set forth in Section 4.10.3, planned residential developments shall
comply with the standards and criteria set forth below:
A. Formal Open Space
A minimum of 0.6% of the total land area of a planned residential development of 15 acres or more
shall be subject to the formal open space requirements of Section 6.2.3. No open area may be
delineated or accepted as formal open space under the provisions of this Chapter unless it meets the
standards of Chapter 6.2, Open Space.
B. Accessibility of Site
All proposed streets, alleys and driveways shall be adequate to serve the residents, occupants, visitors
or other anticipated traffic of the planned residential development. The location of the entrance
points of the streets, alleys and driveways upon exis ting public roadways shall be subject to the
approval of the City or County Division of Public Works.
C. Off-Street Parking
Off-street parking shall be conveniently accessible to all dwelling units and other uses. Where
appropriate, common driveways, parking areas, walks and steps may be provided, maintained and
lighted for night use. Screening of parking and service areas shal l be required through use of trees,
shrubs and/or hedges and screening walls.
D. Pedestrian Circulation
The pedestrian circulation system and its related walkways shall be separated, whenever feasible,
from the vehicular street system in order to provide an appropriate degree of separation of pedestrian
and vehicular movement.
E. Privacy
The planned residential development shall provide reasonable visual and acoustical privacy for
dwelling units within and adjacent to the planned residential development. Protection and
enhancement of property and the privacy of its occupants may be provide d by the screening of
Staff Report August 13, 2026
PD 2026-004 Page 14
14
objectionable views or uses and reduction of noise through the use of fences, insulation, natural
foliage, berms and landscaped barriers. High -rise buildings shall be located within the development
in such a way as to minimize any adverse impact on adjoining low rise buildings.
F. Distance Requirements
Where minimum distance requirements are provided between single family residential zoning
districts and certain stipulated uses in this Code, the single -family residential areas of planned
developments shall be considered zoned residential.
Commercial or Industrial Criteria
Staff disagrees the additional planned commercial or industrial development criteria as set out in Section 4.10.5
of the Unified Development Code are or will be met.
4.10.5 Planned Commercial or Industrial Developments
Approval of a planned commercial or industrial development may be issued by the governing bodies for buildings
or premises to be used for the retail sale of merchandise and services, parking areas, office buildings, hotels and
motels and similar facilities ordinarily accepted as commercial center uses and those industrial uses which can
be reasonably be expected to function in a compatible manner with the other permitted uses in the area. In
addition to the applicable standards and criteria set forth in Sec tion 4.10.3, planned commercial or industrial
developments shall comply with the following standards:
A. Screening
When commercial or industrial structures or uses in a planned commercial or industrial development
abut a residential district or permitted residential buildings in the same development, screening may
be required by the governing bodies.
B. Display of Merchandise
All business, manufacturing and processing shall be conducted, and all merchandise and materials
shall be displayed and stored, within a completely enclosed building or within an open area which is
completely screened from the view of adjacent properties a nd public rights -of-way, provided,
however, that when an automobile service station or gasoline sales are permitted in a planned
commercial development, gasoline may be sold from pumps outside of a structure.
C. Accessibility
The site shall be accessible from the proposed street network in the vicinity which will be adequate to
carry the anticipated traffic of the proposed development. The streets and driveways on the site of
the proposed development shall be adequate to serve the enterprises located in the proposed
development.
D. Landscaping
Landscaping shall be required to provide screening of objectionable views of uses and the reduction
of noise. High-rise buildings shall be located within the development in such a way as to minimize any
adverse impact on adjoining low-rise buildings.
Approval Criteria
Staff disagrees the approval criteria as set out in Section 9.6.9 of the Unified Development Code are being met.
9.6.9 Approval Criteria
No special use permit or planned development shall be approved unless the following findings are made
concerning the application:
A. The project will not have a substantial or undue adverse effect upon adjacent property, the character of
Staff Report August 13, 2026
PD 2026-004 Page 15
15
the neighborhood, traffic conditions, parking, utility facilities and other matters affecting the public
health, safety, and general welfare.
B. The project will be constructed, arranged and operated so as to be compatible with the immediate vicinity
and not interfere with the development and use of adjacent property in accordance with the applicable
district regulations.
C. The project will be served adequately by essential public facilities and services such as streets, parking,
drainage, refuse disposal, fire protection and emergency services, water and sewers; or that the applicant
will provide adequately for such services.
D. The project will not result in the destruction, loss or damage of any feature determined by the governing
bodies to be of significant natural, scenic or historic importance.
E. The project complies with all additional standards imposed on it by any particular provisions authorizing
such use.
F. The request will not adversely affect any plans to be considered (see Chapter 1.9), or violate the character
of existing standards for development of the adjacent properties.
G. The governing bodies may impose conditions to minimize adverse effects on the neighborhood or on
public facilities, and to ensure compatibility of the proposed development with surrounding properties,
uses, and the purpose and intent of this development code.
H. Any decision to deny a special use permit request to place, construct, or modify personal wireless service
facilities shall be in writing and supported by substantial evidence contained in a written record, per the
Telecommunications Act of 1996, 47 USC 332(c)(7)(B)(iii). The review body may not take into account any
environmental or health concerns.
Site Details
Address:
3260 & 0 Holmes Rd
Parcel ID:
094400 00158 and 094400 00159
Area:
+/-34.78 acres
Description:
The subject is known as part of the PT Central Church/ McKellar Park PD (PD 95-337 CC) with underlying zoning
of Residential Urban – 3 (RU-3), Commercial Mixed Use – 2 (CMU-2) & Employment (EMP). Per the Assessor’s
website, the subject property is vacant. A 150-foot gas easement crosses the subject property, and overhead
power lines run along Tchulahoma Road.
Site Zoning History
The applicant previously submitted a rezoning from CMU -2 to EMP application (Z 2025 -007) at the subject
property and withdrawn it before the LUCB meeting.
Concept Plan Review
The proposed plan for mixed -use planned development includes Area A of +/ -16.006 acres for residential use,
Area B of +/-9.252 acres for commercial use, and Area C of +/-5.812 acres for industrial use (truck stop).
Staff Report August 13, 2026
PD 2026-004 Page 16
16
Analysis
The applicant is requesting a mixed-used planned development to allow uses in conjunction with R-6 (residential
/ single-family), CMU-2 (commercial), and EMP (industrial /truck stop) zoning.
The subject property is currently vacant, and the underlaying zoning is RU -1 and CMU -2. The proposed
residential and commercial uses for Area A and B are allowed by right. However, the proposed use for Area C,
truck stop and convenience store with gas pumps are not allowed in CMU-2 zoning district.
According to the UD C, the intent of planned development includes higher -quality environmental design,
preservation of natural features, efficient traffic circulation, rational development in relation to public services,
appropriate locations for commercial or industrial acti vities, and consistency with Memphis 3.0. A planned
development should not be functioned to place an intensive use in a district where that use would otherwise
be prohibited. The proposed planned development does not demonstrate that it would produce a higher quality
environment beyond those achievable under current conventional zoning. Other than the truck stop / gas
station, residential and commercial developments are permitted by the current zoning. The commercial
shopping plaza is already allowed per the existing CMU-2 zoning district, and the single-family detached houses
are permitted use in RU -3 by subdividing the lots. While other considerations may apply, the primary intent
behind seeking a planned development designation appears to be allowing for a truck stop and convenience
store with gas sales as that is the only use not currently permitted on the subject property that would be
permitted within the planned development.
Also, according to the UDC, while reviewing a Special Use Permit application for convenience stores with gas
pumps or gas stations in CMU-2 district, the Land Use Control Board and governing body must consider the
proposed facility’s proximity to other gas stations and convenience stores with gas pumps, as well as to single -
family residential zoning districts. See page 7 of this report that demonstrates the proximity to the single-family
residential in the vicinity. Note that a planned development is approved through the issuance of a special use
permit to allow for flexible and creative land design.
This proposal is inconsistent with the Memphis 3.0 General Plan per the land use decision criteria. See pages
23-25 of this report for further analysis.
The project will have a substantial or undue adverse effect upon adjacent property, the character of the
neighborhood, traffic conditions, parking, utility facilities and other matters affecting the public health, safety,
and general welfare.
RECOMMENDATION
Staff recommends rejection; however, if approved, staff recommends the following outline plan conditions:
Outline Plan Conditions
I. USES PERMITTED:
A. AREA A - R-6
AREA B - CMU-2
AREA C – CMU-2 with following exception:
a. Convenience store with gas pumps
b. Truck Stop without tractor trailer parking
Staff Report August 13, 2026
PD 2026-004 Page 17
17
II. BULK REGULATIONS:
A. AREA A - The bulk regulations of the R-6 zoning district shall apply.
B. AREA B - The bulk regulations of the CMU-2 zoning district shall apply.
C. AREA C - The bulk regulations of the CMU-2 zoning district shall apply.
III. ACCESS AND CIRCULATION:
A. The City Engineer shall approve the design, number and location of curb cuts.
B. Any existing nonconforming curb cuts shall be modified to meet current City/ County Standards or
closed with curb, gutter and sidewalk.
C. Provide internal circulation between adjacent phases, lots, and sections. Common ingress/ egress
easements shall be shown on the final plats.
IV. LANDSCAPING, SCREENING, AND LIGHTING:
A. An NOI as required by the Tree Ordinance shall be filed with the Division of Planning and
Development at least 10 days prior to the removal of any tree that is 10 inches or greater in diameter.
B. Any dumpster or accessory buildings shall be compatible with the main building.
C. Any HVAC equipment or utility meters shall be screened through the use of fencing or landscaping.
If roof mounted, the equipment shall be screened through the use of an architectural feature such
as a parapet.
D. The required landscaping shall be exclusive of and in addition to any required easements.
E. A detailed landscap ing plan shall be submitted with the final plat subject to the approval of the
Division of Planning and Development. If the City Engineer's Office requires detention on this
property that requires landscape to revised, no use Occupancy Permit shall be issued until a detailed
landscaping plan has been approved by the DPD.
F. All light poles shall be limited to a maximum of 35 feet in height.
G. All lighting shall be designed to direct light straight down and not to trespass onto the adjoining
properties. A detailed lighting plan showing the location of the poles and other lighting fixtures and
the photometric analysis shall be submitted with the final plat, subject to the review and approval of
the DPD.
V. Site Plan Review:
A site plan shall be submitted for the review, comment and recommendation of the Division of Planning
and Development ( DPD) and appropriate City Agencies prior to the approval of any plan. However, if
there is a disagreement regarding the intention of any of the above conditions, either party may appeal
to the Land Use Control Board and If necessary, the Memphis City Council.
A. The Site plan shall include:
1. The exact location and dimensions including height of all buildings.
2. The number, location, and dimensions of parking spaces within proposed structures/ lots.
3. A detailed landscaping plan including the species and diameter of any new plants.
4. A lighting plan showing the location of the freestanding poles, the type of fixtures and if required
by DPD, photometric analysis that shows the trespass of light onto adjacent residential properties
is no great than 1.0 candle foot at the property line.
B. The site plan shall be reviewed based on the following criteria:
1. Conformance with the Outline Plan Conditions.
2. Compatibility with existing properties surrounding the site as well as a compatible internal
arrangement of uses.
Staff Report August 13, 2026
PD 2026-004 Page 18
18
3. Elements of design such as building orientation, building mass and height, building materials,
setback, access, parking and internal circulation, landscaping, and lighting.
4. Adequate access shall be provided to the site as determined by the City Engineer.
VI. A final plan shall be filed within five (5) years of the approval of the Outline Plan by the Memphis City
Council. The Land Use Control Board may grant extensions at the request of the applicant.
VII. Any final plan shall include the following:
A. The Outline Plan conditions.
B. A standard subdivision contract as defined by the Subdivision Regulations for any needed public
improvements.
C. The exact location and dimensions including height of all buildings (with elevations) or buildable
areas, parking areas, drives, and required landscaping,
D. The number of parking spaces
E. The location and ownership, whether public or private, of any easement.
F. The following note shall be placed on the final plat of any development requiring on-site storm water
detention facilities: The areas denoted by “Reserved for Storm Water Detention" shall not be used
as a building site or filled without first obtaining written permission from the City Engineer. The storm
water detention located in these areas, except for those parts located in a public drainage easement,
shall be owned and maintained by the property owner and/or owners' association. Such
maintenance shall be performed so as to ensure the system operates in accordance with the
approved plan on file in the City Engineer's Office. Such maintenance shall include, but not be limited
to: removal of sedimentation, fallen objects, debris and trash, mowing, outlet cleaning, and repair of
drainage structures.
Staff Report August 13, 2026
PD 2026-004 Page 19
19
DEPARTMENTAL COMMENTS
The following comments were provided by agencies to which this application was referred:
City Engineer:
Staff Report August 13, 2026
PD 2026-004 Page 20
20
Staff Report August 13, 2026
PD 2026-004 Page 21
21
City Fire Division:
1. All design and construction shall comply with the 2021 edition of the International Fire Code with local
amendments and referenced standards.
2. Fire apparatus access shall comply with section 503.
3. Where security gates are installed that affect required fire apparatus access roads, they shall comply with
section 503.6.
4. Fire protection water supplies (including fire hydrants) shall comply with section 507.
5. Where fire apparatus access roads or a water supply for fire protection are required to be installed, such
protection shall be installed and made serviceable prior to and during the time of construction except when
approved alternate methods of protection are provided.
6. IFC 510 In-building two-way emergency responder communication coverage shall be provided in all new and
existing buildings. Buildings and structures that cannot support the required level of coverage shall be
equipped with systems and components to enhance signals and achieve the required level of
communication coverage.
Staff Report August 13, 2026
PD 2026-004 Page 22
22
7. A detailed plans review will be conducted by the Memphis Fire Prevention Bureau upon receipt of complete
construction documents. Plans shall be submitted to the Shelby County Office of Code Enforcement.
City Real Estate: No comments received.
County Health Department: No comments received.
Shelby County Schools: No comments received.
Construction Code Enforcement: No comments received.
Memphis Light, Gas and Water: No comments received.
Office of Sustainability and Resilience: No comments received.
Staff Report August 13, 2026
PD 2026-004 Page 23
23
Office of Comprehensive Plannin
Staff Report August 13, 2026
PD 2026-004 Page 24
24
Staff Report August 13, 2026
PD 2026-004 Page 25
25
Staff Report August 13, 2026
PD 2026-004 Page 26
26
MAILED PUBLIC NOTICE
Staff Report August 13, 2026
PD 2026-004 Page 27
27
SIGN AFFIDAVIT
Staff Report August 13, 2026
PD 2026-004 Page 28
28
Staff Report August 13, 2026
PD 2026-004 Page 29
29
APPLICATION
Staff Report August 13, 2026
PD 2026-004 Page 30
30
Staff Report August 13, 2026
PD 2026-004 Page 31
31
Staff Report August 13, 2026
PD 2026-004 Page 32
32
Staff Report August 13, 2026
PD 2026-004 Page 33
33
OWNER AFFIDAVIT
Staff Report August 13, 2026
PD 2026-004 Page 34
34
LETTER OF INTENT
Staff Report August 13, 2026
PD 2026-004 Page 35
35
LETTERS RECEIVED
Three letters of opposition were received at the time of completion of this report and have subsequently been
attached.
Staff Report August 13, 2026
PD 2026-004 Page 36
36
East Service Center: 6465 Mullins Station Rd; Memphis,
Tennessee
38134
Downtown Service Center: 125 N. Main Street;
Memphis, Tennessee 38103
website: www.develop901.com
Memphis and Shelby County Division of
Planning and Development
Record Summary for Planned Development
Record Detail Information
Record T
ype: Planned Development Record Status: Additional Info Required
Opened Date: April 10, 2026
Record Number: PD 2026-004
Record Name: Holmes Tchulahoma Planned Development
Expiration Date:
Description of Work: 35 acre planned development with R-6, CMU-2, and EMP uses
Parent Record Number:
Address:
3260 HOLMES RD, MEMPHIS 38118
Owner Information
Primary Owner Name
Owner
Address Owner Phone
Y NEW DEVELOPMENT LLC
3264 W SARAZENS CIR, MEMPHIS, TN 38125
Parcel Information
094400 00158
Data Fields
PREAPPLICA
TION MEETING
Name of DPD Planner Nira Nabanita
Date of Meeting 03/04/2026
Pre-application Meeting Type Email
GENERAL PROJECT INFORMATION
Planned Development Type New Planned Development (PD)
Previous Docket / Case Number Z 2025-007
Medical Overlay / Uptown No
If this development is located in unincorporated
Shelby County, is the tract at least three acres?
(Note a tract of less than three acres is not
n/a
Page 1 of 4 PD 2026-004
GENERAL PROJECT INFORMATION
eligible for a planned development in
unincorporated Shelby County)
Is this application in response to a citation, stop
work order, or zoning letter
No
If yes, please provide a copy of the citation, stop
work order, and/or zoning letter along with any
other relevant information
n/a
APPROV
AL CRITERIA
UDC Sub-Section 9.6.9A Proposed uses are compatible with surrounding
development patterns
UDC Sub-Section 9.6.9B Proposed layout is compatible with surrounding
areas with R-6 uses adjacent to existing R-6.
Commercial uses are south of a natural barrier - gas
easement. EMP uses are on hard corner opposite
similar uses.
UDC Sub-Section 9.6.9C Adequate utilities are present at the site .
Development will contribute to the widening of both
Holmes and Tchulahoma.
UDC Sub-Section 9.6.9D Agreed
UDC Sub-Section 9.6.9E Agreed
UDC Sub-Section 9.6.9F Agreed
GENERAL PROVISIONS
UDC Sub-Section 4.10.3A This project will be compatible with surrounding
areas.
B) An approved water supply, community waste
water treatment and disposal, and storm water
drainage facilities that are adequate to serve the
proposed development have been or will be
provided concurrent with the development
Adequate utilities are available to the site. Site will
have stormwater detention
C) The location and arrangement of the
structures, parking and loading areas, walks,
lighting and other service facilities shall be
compatible with the surrounding land uses, and
any part of the proposed development not used
for such facilities shall be landscaped or
otherwise improved except where natural
features are such as to justify preservation
Proposed site plan is compatible with existing
development patterns.
D) Any modification of the district standards that
would otherwise be applicable to the site are
warranted by the design of the outline plan and
the amenities incorporated therein, and are not
inconsistent with the public interest
Agreed
E) Homeowners’ associations or some other
responsible party shall be required to maintain
any and all common open space and/or common
elements
HOA and POA will be required.
F) Lots of record are created with the recording Agreed
Page 2 of 4 PD 2026-004
GENERAL PROVISIONS
of a planned development final plan
GIS INFORMA
TION
Case Layer PD95-337cc
Central Business Improvement District No
Class R
Downtown Fire District No
Historic District -
Land Use VACANT
Municipality MEMPHIS
Overlay/Special Purpose District -
Zoning CMU-2
State Route -
Lot -
Subdivision PT CENTRAL CHURCH / MCKELLAR PARK P D
Planned Development District -
Wellhead Protection Overlay District No
County Commission District -
City Council District -
City Council Super District -
Contact Information
NEW DEVELOPMENT LLC
3264 W SARAZENS CIR, MEMPHIS, TN, MEMPHIS, TN, 38125
(901)487-2425
APPLICANT
Name
Address
Phone
Contact Type
THE BRAY FIRM
2950 ST
AGE PLAZA NORTH,
(901)487-2425
ARCHITECT / ENGINEER /
SURVEYOR
Name
Address
Phone
Contact Type
Fee Information
Date
AssessedBalanceStatusFeesQuantityFee ItemInvoice #
04/10/20260.00INVOICED0.001Credit Card Use Fee (.026
x fee)
1722257
04/13/20260.00INVOICED3,000.0030Planned Development -
each additional or
fractional acres above 5
1722337
04/13/20260.00INVOICED117.001Credit Card Use Fee (.026
x fee)
1722337
04/13/20260.00INVOICED1,500.001Planned Development - 5
acres or less
1722337
Total Fee Invoiced: $4,617.00 Total Balance: $0.00
Page 3 of 4 PD 2026-004
Payment Information
Payment
Amount Method of Payment
Credit Card$4,617.00
Page 4 of 4 PD 2026-004
Telephone 901-383-8668
2
950 Stage Plaza North
Bartlett, Tennessee 38134
April 10, 2026
Brett Ragsdale, Director
Memphis and Shelby County
Office of Planning and Development
125 North Main Street
Memphis, Tennessee 38103
RE: Planned Development request of the New Development LLC property
At 3260 Holmes Road – Parcel # 094400 00158 – Instrument # 18131603
Holmes Tchulahoma Planned Development
Memphis, Tennessee
Mr. Ragsdale:
Please find attached an application for a planned development on the above captioned property. The
existing zoning of the property is RU-3 and CMU-2. This request would convert the RU-3 area to R-6
zoning compatible with the neighborhood to the north. A portion of the CMU-2 zoning area would
remain with CMU-2 uses and the southeast corner of the site would change to EMP uses. A portion of the
property was originally filed as a zoning request as Z 2025-007. The applicants have held two
neighborhood meeting to work on a plan that would bring the neighbors a plan they can support.
Thank you for considering this request. If you have any questions or need any additional information,
please contact me.
Sincerely,
David Gean Bray, P.E.
City Hall – 125 N. Main Street, Suite 468 – Memphis, Tennessee 38103 – (901) 636-6619
August 13, 2026
New Development LLC
3264 W Sarazens Cir
Memphis, TN 38125
Sent via electronic mail to: dgbray@comcast.net, BERUK@berukproperties.net &
thewgley@baslawandtitle.com
Holmes Tchulahoma Planned Development
Case Number: PD 2026-004
LUCB Recommendation: Rejection
Dear applicant,
On Thursday, August 13 , 20 26, t he Memphis and Shelby County Land Use Control Board
recommended rejection of your planned development application for the Holmes Tchulahoma
Planned Development, subject to the attached outline plan conditions.
This application will be forwarded, for final action, to the Council of the City of Memphis. The Council
will review your application in a committee meeting prior to voting on it in a public hearing. The
applicant or the applicant’s representative(s) shall be in attendance at all meetings and hearings.
It is the applicant’s responsibility to contact the City Council Records Office to determine when the
application is scheduled to be heard at co mmittee and in public session. The City Council Records
Office may be reached at (901) 636-6792.
If for some reason you choose to withdraw your application, a letter should be mailed to the Land
Use and Development Services Department of the Division of Planning and Development at the
address provided above or emailed to the address provided below.
If you have questions regarding this matter, please feel free to contact me at (901) 636-6619 or via
email at nabanita.nira@memphistn.gov.
Respectfully,
Nabanita Nira
Planner II
Land Use and Development Services
Division of Planning and Development
Cc: David Gean Bray, The Bray Firm
File
Letter to Applicant
PD 2026-004
Page 2 of 3
Outline Plan Conditions
I. USES PERMITTED:
A. AREA A - R-6
AREA B - CMU-2
AREA C – CMU-2 with following exception:
a. Convenience store with gas pumps
b. Truck Stop without tractor trailer parking
II. BULK REGULATIONS:
A. AREA A - The bulk regulations of the R-6 zoning district shall apply.
B. AREA B - The bulk regulations of the CMU-2 zoning district shall apply.
C. AREA C - The bulk regulations of the CMU-2 zoning district shall apply.
III. ACCESS AND CIRCULATION:
A. The City Engineer shall approve the design, number and location of curb cuts.
B. Any existing nonconforming curb cuts shall be modified to meet current City/ County
Standards or closed with curb, gutter and sidewalk.
C. Provide internal circulation between adjacent phases, lots, and sections. Common
ingress/ egress easements shall be shown on the final plats.
IV. LANDSCAPING, SCREENING, AND LIGHTING:
A. An NOI as required by the Tree Ordinance shall be filed with the Division of Planning and
Development at least 10 days prior to the removal of any tree that is 10 inches or greater
in diameter.
B. Any dumpster or accessory buildings shall be compatible with the main building.
C. Any HVAC equipment or utility meters shall be screened through the use of fencing or
landscaping. If roof mounted, the equipment shall be screened through the use of an
architectural feature such as a parapet.
D. The required landscaping shall be exclusive of and in addition to any required easements.
E. A detailed landscaping plan shall be submitted with the final plat subject to the approval
of the Division of Planning and Development. If the City Engineer's Office requires
detention on this property that requires landscape to revised, no use Occupancy Permit
shall be issued until a detailed landscaping plan has been approved by the DPD.
F. All light poles shall be limited to a maximum of 35 feet in height.
G. All lighting shall be designed to direct light straight down and not to trespass onto the
adjoining properties. A detailed lighting plan showing the location of the poles and other
lighting fixtures and the photometric analysis shall be submitted with the final plat,
subject to the review and approval of the DPD.
V. Site Plan Review:
A site plan shall be submitted for the review, comment and recommendation of the Division
of Planning and Development ( DPD) and appropriate City Agencies prior to the approval of
any plan. However, if there is a disagreement regarding the intention of any of the above
conditions, either party may appeal to the Land Use Control Board and If necessary, the
Memphis City Council.
A. The Site plan shall include:
Letter to Applicant
PD 2026-004
Page 3 of 3
1. The exact location and dimensions including height of all buildings.
2. The number, location, and dimensions of parking spaces within proposed structures/
lots.
3. A detailed landscaping plan including the species and diameter of any new plants.
4. A lighting plan showing the location of the freestanding poles, the type of fixtures
and if required by DPD, photometric analysis that shows the trespass of light onto
adjacent residential properties is no great than 1.0 candle foot at the property line.
B. The site plan shall be reviewed based on the following criteria:
1. Conformance with the Outline Plan Conditions.
2. Compatibility with existing properties surrounding the site as well as a compatible
internal arrangement of uses.
3. Elements of design such as building orientation, building mass and height, building
materials, setback, access, parking and internal circulation, landscaping, and lighting.
4. Adequate access shall be provided to the site as determined by the City Engineer.
VI. A final plan shall be filed within five (5) years of the approval of the Outline Plan by the
Memphis City Council. The Land Use Control Board may grant extensions at the request of
the applicant.
VII. Any final plan shall include the following:
A. The Outline Plan conditions.
B. A standard subdivision contract as defined by the Subdivision Regulations for any needed
public improvements.
C. The exact location and dimensions including height of all buildings (with elevations) or
buildable areas, parking areas, drives, and required landscaping,
D. The number of parking spaces
E. The location and ownership, whether public or private, of any easement.
F. The following note shall be placed on the final plat of any development requiring on-site
storm water detention facilities: The areas denoted by “ Reserved for Storm Water
Detention" shall not be used as a building site or filled without first obtaining written
permission from the City Engineer. The storm water detention located in these areas,
except for those parts located in a public drainage ease ment, shall be owned and
maintained by the property owner and/or owners' association. Such maintenance shall
be performed so as to ensure the system operates in accordance with the approved plan
on file in the City Engineer's Office. Su ch maintenance shall include, but not be limited
to: removal of sedimentation, fallen objects, debris and trash, mowing, outlet cleaning,
and repair of drainage structures.
Memphis City Council
Summary Sheet
SUP 2025-037
RESOLUTION PURSUANT TO CHAPTER 9.6 OF THE MEMPHIS AND SHELBY COUNTY
UNIFIED DEVELOPMENT CODE APPROVING A SPECIAL USE PERMIT AT THE SUBJECT
PROPERTY LOCATED AT 1681 E RAINES RD, KNOWN AS CASE NUMBER SUP 2025-037
• This item is a resolution with conditions for a special use permit to allow a
convenience store with gas pumps; and
• The item may require future public improvement contracts.
1
LAND USE CONTROL BOARD RECOMMENDATION
At its regular meeting on Thursday, February 12, 2025, the Memphis and Shelby County Land Use Control
Board held a public hearing on the following application:
CASE NUMBER: SUP 2025-037
LOCATION: 1681 E Raines Rd
COUNCIL DISTRICT(S): District 3 and Super District 8 – Positions 1, 2, and 3
OWNER/APPLICANT: HMM Investment LLC
REPRESENTATIVE: The Bray Firm
REQUEST: Special use permit to allow a convenience store with gas pumps
EXISTING ZONING: Commercial Mixed Use – 1 (CMU-1)
AREA: +/-30,66 square feet
The following spoke in support: David Bray
The following spoke in opposition: Milton Poe
The Land Use Control Board reviewed the application and the staff report . A motion was made and
seconded to recommend rejection.
The motion failed by a vote of 4-5-0 on the consent agenda.
Respectfully,
Cc: Committee Members
File
2
SUP 2025-037
CONDITIONS
1. Streetscape Plate Type S-10 shall be provided along Raines Road and Millbranch Road.
2. The convenience store is prohibited from the sale of Alcohol, and CBD/Cannabis products.
3. The dumpster location and screening shall meet the requirements of UDC Sub Section 4.6.8B.
4. The convenience store building facing Raines Road and Millbranch Road shall be a minimum of
60% transparency.
5. Support columns for the fuel canopy shall be sheathed in the same masonry used on the principal
building.
6.
7. The exterior building materials for the convenience store shall consist of a minimum of 50 percent
masonry, with EIFS or stucco limited to a maximum of 10 percent of the building facade.
8. An Administrative Site Plan Review (ASPR) shall be submitted and approved by the Division of
Planning and Development following final approval by the Memphis City Council and prior to the
issuance of any building permits or certificates of occupancy.
3
SITE PLAN
4
SITE PLAN – MAGNIFIED
RESOLUTION PURSUANT TO CHAPTER 9.6 OF THE MEMPHIS AND SHELBY COUNTY
UNIFIED DEVELOPMENT CODE APPROVING A SPECIAL USE PERMIT AT THE SUBJECT
PROPERTY LOCATED AT 1681 E RAINES RD, KNOWN AS CASE NUMBER SUP 2025-037
WHEREAS, Chapter 9.6 of the Memphis and Shelby County Unified Development Code, being a
section of the Joint Ordinance Resolution No. 5367, dated August 10, 2010, authorizes the Council of the
City of Memphis to grant a special use permit for certain stated purpos es in the various zoning districts;
and
WHEREAS, the HMM Investment LLC filed an application with the Memphis and Shelby County
Division of Planning and Development to allow a convenience store with gas pumps; and
WHEREAS, the Division of Planning and Development has received and reviewed the application
in accordance with procedures, objectives, and standards for special use permits as set forth in Chapter 9.6
with regard to the proposed development's impacts upon surrounding propertie s, availability of public
facilities, both external and internal circulation, land use compatibility, and that the design and amenities
are consistent with the public interest; and has submitted its findings and recommendation concerning the
above considerations to the Land Use Control Board; and
WHEREAS, a public hearing in relation thereto was held before the Memphis and Shelby County
Land Use Control Board on February 12, 20 26, and said Board has submitted its findings and
recommendation concerning the above considerations to the Council of the City of Memphis; and
WHEREAS, the Council of the City of Memphis has reviewed the aforementioned application
pursuant to Tennessee Code Annotated Section 13 -4-202(B)(2)(B)(iii) and has determined that said
development is consistent with the Memphis 3.0 General Plan; and
WHEREAS, the Council of the City of Memphis has reviewed the recommendation of the Land
Use Control Board and the report and recommendation of the Division of Planning and Development and
has determined that said development meets the objectives, standards and criteria for a special use permit,
and said development is consistent with the public interests.
NOW, THEREFORE, BE IT RESOLVED, BY THE COUNCIL OF THE CITY OF
MEMPHIS, that, pursuant to Chapter 9.6 of the Memphis and Shelby County Unified Development Code,
a special use permit is hereby granted for the request use in accordance with the attached conditions.
BE IT FURTHER RESOLVED , that this permit merely authorizes the filing of applications to
acquire a Certificate of Use and Occupancy, or a Building Permit, and other required permits and approvals,
provided that no such Certificate of Use and Occupancy shall be granted until all conditions imposed by
the Council of the City of Memphis have been met.
BE IT FURTHER RESOLVED , that this Resolution take effect from and after the date it shall
have been passed by this Council of the City of Memphis, and become effective as otherwise provided by
law, and thereafter shall be treated as in full force and effect by virtue of passage thereof by the Council of
the City of Memphis, the public welfare requiring same.
CONDITIONS
1. Streetscape Plate Type S-10 shall be provided along Raines Road and Millbranch Road.
2. The convenience store is prohibited from the sale of Alcohol, and CBD/Cannabis products.
3. The dumpster location and screening shall meet the requirements of UDC Sub Section 4.6.8B.
4. The convenience store building facing Raines Road and Millbranch Road shall be a minimum of
60% transparency.
5. Support columns for the fuel canopy shall be sheathed in the same masonry used on the principal
building.
6. The exterior building materials for the convenience store shall consist of a minimum of 50 percent
masonry, with EIFS or stucco limited to a maximum of 10 percent of the building facade.
7. An Administrative Site Plan Review (ASPR) shall be submitted and approved by the Division of
Planning and Development following final approval by the Memphis City Council and prior to the
issuance of any building permits or certificates of occupancy.
SITE PLAN
ATTEST:
CC: Division of Planning and Development
– Land Use and Development Services
– Office of Construction Enforcement
Staff Writer: Mahsan Ostadnia E-mail: mahsan.ostadnia@memphistn.gov
AGENDA ITEM: 4 L.U.C.B. MEETING: February 12, 2026
CASE NUMBER: SUP 2025-037
LOCATION: 1681 E Raines Rd
COUNCIL DISTRICT: District 3 and Super District 8 – Positions 1, 2, and 3
OWNER/APPLICANT: HMM Investment LLC
REPRESENTATIVE: The Bray Firm
REQUEST: Special use permit to allow a convenience store with gas pumps
EXISTING ZONING: Commercial Mixed Use – 1 (CMU-1)
CONCLUSIONS
1. The applicant requests a Special Use Permit to allow a convenience store with gas pumps on Lot 2 of
Rainbranch, zoned Commercial Mixed -Use – 1 (CMU-1). The site contains an existing 1,411 -square-foot
building constructed in 1958 and is surrounded by a mix of residential, commercial, and institutional uses.
The property has two street frontages, providing access and visibility.
2. The submitted site plan proposes redevelopment with a 13,741 -square-foot retail building and 53 off -
street parking spaces, including three ADA-compliant spaces, with access from Millbranch Road and Raines
Road and internal circulation designed to prevent backing into the public right-of-way.
3. The plan includes replacement of non-compliant sidewalks and curbs with 5-foot sidewalks within 4.5-foot
grass strips, installation of an ADA -compliant ramp, and landscaping improvements consisting of street
and interior plantings to enhance the streetscape and reduce the visual impact of paved areas.
4. Pursuant to UDC Section 2.6.3J(1)(g), applications for convenience stores with gas pumps in the CMU -1
district require consideration of proximity to existing gas stations and nearby single -family residential
zoning districts. An existing gas station is located directly across the street at the southeast intersection of
East Raines Road and Millbranch Road, establishing a similar use in the immediate area. The subject
property is located approximately 80 feet from a place of worship zoned R-10 to the north, which functions
as an intervening non-residential use. The nearest single-family dwelling is located approximately 195 feet
west of the proposed gas station on property zoned Office General (OG). These proximity conditions have
been identified and documented for consideration by the staff planner.
5. The granting of this special use permit will cause substantial detriment to the public good, it will
substantially impair the intent and purpose of an adopted plan or the Unified Development Code (UDC),
it will be injurious to the neighborhood and the gene ral welfare, and it will not be in harmony with the
purpose and intent of the UDC.
CONSISTENCY WITH MEMPHIS 3.0
This proposal is inconsistent with the Memphis 3.0 General Plan per the land use decision criteria. See further
analysis on pages 19-21 of this report.
RECOMMENDATION:
Rejection
Staff Report February 12, 2026
SUP 2025-037 Page 2
2
LOCATION MAP
Subject property located within the pink circle.
SUBJECT PROPERTY
Staff Report February 12, 2026
SUP 2025-037 Page 3
3
PUBLIC NOTICE VICINITY MAP
Subject property highlighted in yellow.
PUBLIC NOTICE DETAILS
In accordance with Sub-Section 9.3.4A of the Unified Development Code, a notice of public hearing is required
to be mailed and signage posted. A total of 50 notices were mailed on December 16, 2025, see page 22 of this
report for a copy of said notice. Additionally, two signs were posted at the subject property, see pages 23-24 of
this report for a copy of the sign affidavit.
NEIGHBORHOOD MEETING (First One)
The meeting was held at 6:00 PM on Monday, December 22, 20 25, at Whitehaven Branch Library, 4120
Millbranch Road, Memphis, TN 38116. See pages 25-26 of this report for a copy of the neighborhood meeting
summary.
Staff Report February 12, 2026
SUP 2025-037 Page 4
4
AERIAL
Subject property outlined in yellow.
Staff Report February 12, 2026
SUP 2025-037 Page 5
5
ZONING MAP
Subject property highlighted in yellow.
Staff Report February 12, 2026
SUP 2025-037 Page 6
6
LAND USE MAP
Subject property indicated by a pink star.
Staff Report February 12, 2026
SUP 2025-037 Page 7
7
SITE PHOTOS
View of subject property from East Raines Road.
View of subject property from Millbranch Road.
View of subject property from above.
Staff Report February 12, 2026
SUP 2025-037 Page 8
8
View of subject property from above.
View of subject property from above.
Staff Report February 12, 2026
SUP 2025-037 Page 9
9
SITE PLAN
Staff Report February 12, 2026
SUP 2025-037 Page 10
10
SITE PLAN – MAGNIFIED
Staff Report February 12, 2026
SUP 2025-037 Page 11
11
ELEVATIONS
Staff Report February 12, 2026
SUP 2025-037 Page 12
12
CASE REVIEW
Request
The request is a special use permit to allow a convenience store with gas pumps.
Approval Criteria
Staff disagrees the approval criteria in regard to special use permits as set out in Section 9.6.9 of the Unified
Development Code are met.
9.6.9 Approval Criteria
No special use permit or planned development shall be approved unless the following findings are made
concerning the application:
9.6.9A The project will not have a substantial or undue adverse effect upon adjacent property, the
character of the neighborhood, traffic conditions, parking, utility facilities and other matters
affecting the public health, safety, and general welfare.
9.6.9B The project will be constructed, arranged and operated so as to be compatible with the
immediate vicinity and not interfere with the development and use of adjacent property in
accordance with the applicable district regulations.
9.6.9C The project will be served adequately by essential public facilities and services such as streets,
parking, drainage, refuse disposal, fire protection and emergency services, water and sewers; or
that the applicant will provide adequately for such services.
9.6.9D The project will not result in the destruction, loss or damage of any feature determined by the
governing bodies to be of significant natural, scenic or historic importance.
9.6.9E The project complies with all additional standards imposed on it by any particular provisions
authorizing such use.
9.6.9F The request will not adversely affect any plans to be considered (see Chapter 1.9), or violate the
character of existing standards for development of the adjacent properties.
9.6.9G The governing bodies may impose conditions to minimize adverse effects on the neighborhood
or on public facilities, and to ensure compatibility of the proposed development with surrounding
properties, uses, and the purpose and intent of this development code.
9.6.9H Any decision to deny a special use permit request to place, construct, or modify personal wireless
service facilities shall be in writing and supported by substantial evidence contained in a written
record, per the Telecommunications Act of 1996, 47 USC 3 32(c)(7)(B)(iii). The review body may
not take into account any environmental or health concerns.
Site Details
Address:
1681 E Raines Rd
Parcel ID:
079009 00048
Area:
+/-30,66 square feet
Staff Report February 12, 2026
SUP 2025-037 Page 13
13
Description:
The subject property is known as Lot 2 of Rainbranch with a zoning of Commercial Mixed-Use – 1 (CMU-1). Per
the Assessor’s website, the principal structure on the site was built in 1958 with a ground floor area of 1,411
square feet and the surrounding land uses are a mixture of residential, commercial, and institutional lots.
Additionally, this lot has two street frontages.
Relevant Unified Development Code Clauses
Section 2.6.3J(1)(g)
Site Plan Review
The site plan proposes a convenience store with gas pumps located at the intersection of Millbranch Road and
Raines Road, both classified as 80 -foot rights -of-way. The plan shows a single commercial building with an
approximate footprint of 13,741 square feet. A total of 53 off-street parking spaces are provided, including three
(3) ADA-compliant spaces located near the primary building entrance. Vehicular access is taken from both public
streets, and internal circulation is designed to allow vehicles to maneuver on-site without backing into the public
right-of-way.
The plan suggests replacement of existing sidewalks along both street frontages, including a 5 -foot sidewalk
along Millbranch Road (west side) and a 5-foot sidewalk along Raines Road (south side), each within a 4.5 -foot
grass strip. The existing sidewalk d oes not meet ADA cross -slope requirements in certain areas, and
improvements include removal and replacement of non-compliant curb, gutter, and sidewalk sections. An ADA-
compliant ramp is shown at the intersection, consistent with current accessibility sta ndards. The plan also
provides three (3) EV charging spaces.
Landscaping includes 23 Japanese Snowbell trees (2 -inch caliper), 6 Foster Holly trees (6 -foot height), and 152
Dwarf Yaupon Holly shrubs (18–24-inch spread, spaced 4 feet on center). These plantings are distributed along
street frontages and within interior landscaped areas to enhance the streetscape and provide visual relief within
parking areas. Additional site details include curb and driveway construction specifications, such as maximum
2% cross-slope, depressed curb configurations, Class “A” concrete, and broom or scored finishes, with final curb-
cut dimensions.
Staff Report February 12, 2026
SUP 2025-037 Page 14
14
Analysis
The applicant requests a Special Use Permit to allow a convenience store with gas pumps on Lot 2 of Rainbranch,
zoned Commercial Mixed-Use – 1 (CMU-1). The site contains an existing 1,411-square-foot building constructed
in 1958 and is surrounded by a mix of residential, commercial, and institutional uses. The property has two
street frontages, providing access and visibility.
The submitted site plan proposes redevelopment with a 13,741 -square-foot retail building and 53 off -street
parking spaces, including three ADA-compliant spaces, with access from Millbranch Road and Raines Road and
internal circulation designed to prevent backing into the public right-of-way.
The plan includes replacement of non-compliant sidewalks and curbs with 5-foot sidewalks within 4.5-foot grass
strips, installation of an ADA -compliant ramp, three (3) EV charging spaces, and landscaping improvements
consisting of street and interior plant ings to enhance the streetscape and reduce the visual impact of paved
areas.
Pursuant to UDC Section 2.6.3J(1)(g), applications for convenience stores with gas pumps in the CMU -1 district
require consideration of proximity to existing gas stations and nearby single -family residential zoning districts.
An existing gas station is located directly across the street at the southeast intersection of East Raines Road and
Millbranch Road, establishing a similar use in the immediate area. The subject property is located approximately
80 feet from a place of worship zoned R-10 to the north, which functions as an intervening non-residential use.
The nearest single -family dwelling is located approximately 195 feet west of the proposed gas station on
property zoned Office General (OG). These proximity conditions have been identified and document ed for
consideration by the staff planner.
The granting of this special use permit will cause substantial detriment to the public good, it will substantially
impair the intent and purpose of an adopted plan or the Unified Development Code (UDC), it will be injurious
to the neighborhood and the general welfare, and it will not be in harmony with the purpose and intent of the
UDC.
RECOMMENDATION
Staff recommends rejection; however, if approved, staff recommends the following conditions:
Conditions
1. Streetscape Plate Type S-10 shall be provided along Raines Road and Millbranch Road.
2. The convenience store is prohibited from the sale of Alcohol, and CBD/Cannabis products.
3. The dumpster location and screening shall meet the requirements of UDC Sub Section 4.6.8B.
4. The convenience store building facing Raines Road and Millbranch Road shall be a minimum of 60%
transparency.
5. Support columns for the fuel canopy shall be sheathed in the same masonry used on the principal
building.
Staff Report February 12, 2026
SUP 2025-037 Page 15
15
6. The exterior building materials for the convenience store shall consist of a minimum of 50 percent
masonry, with EIFS or stucco limited to a maximum of 10 percent of the building facade.
7. An Administrative Site Plan Review (ASPR) shall be submitted and approved by the Division of Planning
and Development following final approval by the Memphis City Council and prior to the issuance of any
building permits or certificates of occupancy.
Staff Report February 12, 2026
SUP 2025-037 Page 16
16
DEPARTMENTAL COMMENTS
The following comments were provided by agencies to which this application was referred:
City Engineer: See page 17.
County Engineer: No comments received.
City Fire Division: See page 18.
County Fire Division: No comments received.
City Real Estate: No comments received.
County Health Department: No comments received.
Shelby County Schools: No comments received.
Construction Code Enforcement: No comments received.
Memphis Light, Gas and Water: No comments received.
Office of Sustainability and Resilience: No comments received.
Office of Comprehensive Planning: See pages 19-21.
Staff Report February 12, 2026
SUP 2025-037 Page 17
17
City Engineer Division
1. Standard Public Improvement Contract or Right-Of-Way Permit as required in Section 5.5.5 of the Unified
Development Code.
Sewers:
2. City sanitary sewers are available to serve this development.
Roads:
3. The Developer shall be responsible for the repair and/or replacement of all existing curb and gutter along
the frontage of this site as necessary.
4. All existing sidewalks and curb openings along the frontage of this site shall be inspected for ADA
compliance. The developer shall be responsible for any reconstruction or repair necessary to meet City
standards.
Traffic Control Provisions:
5. The developer shall provide a traffic control plan to the city engineer that shows the phasing for each
street frontage during demolition and construction of curb gutter and sidewalk. Upon completion of
sidewalk and curb and gutter improvements, a minimum 5 foot wide pedestrian pathway shall be provided
throughout the remainder of the project. In the event that the existing right of way width does not allow
for a 5 foot clear pedestrian path, an exception may be considered.
6. Any closure of the right of way shall be time limited to the active demolition and construction of sidewalks
and curb and gutter. Continuous unwarranted closure of the right of way shall not be allowed for the
duration of the project. The developer shall provide on the traffic control plan, the time needed per phase
to complete that portion of the work. Time limits will begin on the day of closure and will be monitored by
the Engineering construction inspectors on the job.
7. The developer’s engineer shall submit a Trip Generation Report that documents the proposed land use,
scope and anticipated traffic demand associated with the proposed development. A detailed Traffic Impact
Study will be required when the accepted Trip Generation Report indicates that the number for projected
trips meets or exceeds the criteria listed in Section 210-Traffic Impact Policy for Land Development of the
City of Memphis Division of Engineering Design and Policy Review Manual. Any required Traffic Impact
Study will need to be formally approved by the City of Memphis, Traffic Engineering Department.
Curb Cuts/Access:
8. The City Engineer shall approve the design, number, and location of curb cuts.
9. Any existing nonconforming curb cuts shall be modified to meet current City Standards or closed with
curb, gutter, and sidewalk.
10. Development of site will require ASPR.
Staff Report February 12, 2026
SUP 2025-037 Page 18
18
City Fire Division
1. All design and construction shall comply with the 2021 edition of the International Fire Code with
local amendments and referenced standards.
2. Fire apparatus access shall comply with section 503.
3. Where security gates are installed that affect required fire apparatus access roads, they shall comply
with section 503.6.
4. Fire protection water supplies (including fire hydrants) shall comply with section 507.
5. Where fire apparatus access roads or a water supply for fire protection are required to be installed,
such protection shall be installed and made serviceable prior to and during the time of construction
except when approved alternate methods of protection are provided.
6. IFC 510 In-building two-way emergency responder communication coverage shall be provided in all
new and existing buildings. Buildings and structures that cannot support the required level of
coverage shall be equipped with systems and components to enhance signals and achieve the
required level of communication coverage.
7. A detailed plans review will be conducted by the Memphis Fire Prevention Bureau upon receipt of
complete construction documents. Plans shall be submitted to the Shelby County Office of Code
Enforcement.
Staff Report February 12, 2026
SUP 2025-037 Page 19
19
Office of Comprehensive Planning
This summary is being produced in response to the following application to support the Land Use and Development
Services Department in their recommendation: SUP 2025-037: WHITEHAVEN
Site Address/Location: 1681 E Raines Rd
Overlay District/Historic District/Flood Zone: Not in a historic district, overlay or flood zone
Future Land Use Designation: Low Intensity Commercial and Services (CSL)
Street Type: Parkway
The applicant requests a SUP to allow a C-store with gasoline sales in the CMU-1 zoning district.
The following information about the land use designation can be found on pages 76 – 122:
1. Future Land Use Planning Map
Red polygon indicates the application site on the Future Land Use Map.
Staff Report February 12, 2026
SUP 2025-037 Page 20
20
2. Land Use Description/Intent
Low Intensity Commercial and Service (CSL) areas are typically
not associated with anchors. These areas may include
neighborhood supporting commercial uses such as retail sales
and services, offices, restaurants, funeral services, small-scale
recreation, social service institutions, and occasional upper-story
residential. Graphic portrayal of CSL is to the right.
“CSL” Form & Location Characteristics
Commercial and services uses, 1-4 stories height
“CSL” Zoning Notes
Generally compatible with the following zone districts: CMU-1 without frontage requirements, OG, SDBP in accordance
with Form and characteristics listed above.
Existing, Adjacent Land Use and Zoning
Existing Land Use and Zoning: Commercial, CMU-1
Adjacent Land Use and Zoning: Commercial, Single-Family, Institutional and OG, R-10
Overall Compatibility: This requested use is incompatible with the land use description/intent, form & location
characteristics, zoning notes, and existing, adjacent land use. The request for gasoline sales is not compatible with the
Whitehaven District goal of improving pedestrian and cyclist infrastructure to increase accessibility and safety along
major corridors.
Staff Report February 12, 2026
SUP 2025-037 Page 21
21
Degree of Change Map
Red polygon denotes the proposed site on the Degree of Change Map. There is no Degree of Change.
3. Degree of Change Description
N/A
4. Objectives/Actions Consistent with Goal 1, Complete, Cohesive, Communities
N/A
5. Pertinent Sections of Memphis 3.0 that Address Land Use Recommendations
Improve pedestrian and cyclist infrastructure to increase accessibility and safety along major corridors
Consistency Analysis Summary
The applicant is to allow a c store in a SUP request to allow a C-store with gasoline sales in the CMU-1 zoning district.
This requested use is incompatible with the land use description/intent, form & location characteristics, zoning notes, and
existing, adjacent land use. The request for gasoline sales is not compatible with the Whitehaven District goal of
improving pedestrian and cyclist infrastructure to increase accessibility and safety along major corridors.
Based on the information provided, the proposal is INCONSISTENT with the Memphis 3.0 Comprehensive
Plan.
Staff Report February 12, 2026
SUP 2025-037 Page 22
22
MAILED PUBLIC NOTICE
Staff Report February 12, 2026
SUP 2025-037 Page 23
23
SIGN AFFIDAVIT
Staff Report February 12, 2026
SUP 2025-037 Page 24
24
Staff Report February 12, 2026
SUP 2025-037 Page 25
25
NEIGHBORHOOD MEETING SUMMARY (FIRST MEETING)
Staff Report February 12, 2026
SUP 2025-037 Page 26
26
Staff Report February 12, 2026
SUP 2025-037 Page 27
27
APPLICATION
Staff Report February 12, 2026
SUP 2025-037 Page 28
28
Staff Report February 12, 2026
SUP 2025-037 Page 29
29
Staff Report February 12, 2026
SUP 2025-037 Page 30
30
OWNER AFFIDAVIT
Staff Report February 12, 2026
SUP 2025-037 Page 31
31
LETTER OF INTENT
Staff Report February 12, 2026
SUP 2025-037 Page 32
32
LETTERS RECEIVED
One letter of opposition was received at the time of completion of this report.
Staff Report February 12, 2026
SUP 2025-037 Page 33
33
Staff Report February 12, 2026
SUP 2025-037 Page 34
34
Staff Report February 12, 2026
SUP 2025-037 Page 35
35
Staff Report February 12, 2026
SUP 2025-037 Page 36
36
Staff Report February 12, 2026
SUP 2025-037 Page 37
37
East Service Center: 6465 Mullins Station Rd; Memphis,
Tennessee
38134
Downtown Service Center: 125 N. Main Street;
Memphis, Tennessee 38103
website: www.develop901.com
Memphis and Shelby County Division of
Planning and Development
Record Summary for Special Use Permit
Record Detail Information
Record T
ype: Special Use Permit Record Status: Additional Info Required
Opened Date: November 26, 2025
Record Number: SUP 2025-037
Record Name: Lot 2&3, Rainbranch Subdivision
Expiration Date:
Description of Work: SUP request to allow a C-store with gasoline sales in the CMU-1 zoning district
Parent Record Number:
Address:
1681 E RAINES RD, MEMPHIS 38116
Owner Information
Primary Owner Name
Owner
Address Owner Phone
Y HMM INVESTMENTS LLC
1671 E RAINES RD, MEMPHIS, TN 38116
Parcel Information
079009 00048
Data Fields
PREAPPLICA
TION MEETING
Name of DPD Planner Chip Saliba
Date of Meeting 09/10/2025
Pre-application Meeting Type Phone
GENERAL PROJECT INFORMATION
Application Type New Special Use Permit (SUP)
List any relevant former Docket / Case
Number(s) related to previous applications on
this site
n/a
Is this application in response to a citation, stop
work order, or zoning letter
No
Page 1 of 3 SUP 2025-037
GENERAL PROJECT INFORMATION
If yes, please provide a copy of the citation, stop
work order, and/or zoning letter along with any
other relevant information
n/a
APPROV
AL CRITERIA
A) The project will not have a substantial or
undue adverse effect upon adjacent property, the
character of the neighborhood, traffic conditions,
parking, utility facilities and other matters
affecting the public health, safety, and general
welfare
Raines and Millbranch is an existing signalized
intersection with commercial development on all four
corners. The subject property is currently used as
an auto garage. The proposed development meets
the standards of the UDC for a c-store in the CMU-1
zoning district and will be compatible with
surrounding uses.
B) The project will be constructed, arranged and
operated so as to be compatible with the
immediate vicinity and not interfere with the
development and use of adjacent property in
accordance with the applicable district
regulations
The proposed development meets the enhanced
requirements for a C-store with gasoline sales in the
CMU-1 zoing district.
UDC Sub-Section 9.6.9C All essential facilities are currently present at the
site.
UDC Sub-Section 9.6.9D Agreed
UDC Sub-Section 9.6.9E Agreed
UDC Sub-Section 9.6.9F Agreed
GIS INFORMATION
Case Layer -
Central Business Improvement District No
Class C
Downtown Fire District No
Historic District -
Land Use COMMERCIAL
Municipality MEMPHIS
Overlay/Special Purpose District -
Zoning CMU-1
State Route -
Lot 0 2
Subdivision RAINBRANCH
Planned Development District -
Wellhead Protection Overlay District No
County Commission District -
City Council District -
City Council Super District -
Contact Information
Page 2 of 3 SUP 2025-037
HMM INVESTMENTS LLC
1671 E RAINES RD, HAKIS & SONS INC, MEMPHIS, TN, MEMPHIS, TN, 381
16
-
APPLICANT
Name
Address
Phone
Contact Type
THE BRAY FIRM
2950 ST
AGE PLAZA NORTH,
(901)487-2425
ARCHITECT / ENGINEER /
SURVEYOR
Name
Address
Phone
Contact Type
Fee Information
Date
AssessedBalanceStatusFeesQuantityFee ItemInvoice #
12/01/20250.00INVOICED500.001Special Use Permit Fee -
5 acres or less (Base Fee)
1693126
Total Fee Invoiced: $500.00 Total Balance: $0.00
Payment Information
Payment
Amount Method of Payment
Check$500.00
Page 3 of 3 SUP 2025-037
Telephone 901-383-8668
2
950 Stage Plaza North
Bartlett, Tennessee 38134
November 25, 2025
Brett Ragsdale, Director
Memphis and Shelby County
Office of Planning and Development
125 North Main Street
Memphis, Tennessee 38103
RE: Special Use Permit for 1681 Raines Road
Lots 2 & 3, Rainbranch Subdivision (P.B. 62, Pg. 42)
CMU-1 Zoning District
Memphis, Tennessee
Mr. Ragsdale:
Please find attached an application for a Special Use Permit to allow a C-store with gasoline sales in the
CMU -1 zoning district. The northern part of the existing site is currently used as an auto garage in the
CMU-1 zoning district and the southern half is currently vacant. This proposal would remove the existing
building and construct a new 4100 square foot building with connected canopy for the four fuel pumps.
The site currently has five drive aprons including several located two close to the intersection per current
standards. This proposal will reduce the drive aprons to two and create the required streetscape planting
around the front perimeters of the site. The existing chain link fence along the right-of-way will be
removed. In addition to the gas pumps, three EV charging stations will be provided on the north side of
the building. Although these are included in the parking count for the site, the site has more than adequate
parking without the inclusion of these spaces.
Thank you for considering this request. If you have any questions or need any additional information,
please contact me.
Sincerely,
David Gean Bray, P.E.
ORDINANCE NO. ______
AN ORDINANCE DECLARING A TEMPORARY MORATORIUM ON THE
ACCEPTANCE, PROCESSING, APPROV AL, AND ISSUANCE OF ZONING, LAND
USE, BUILDING, AND OTHER ASSOCIATED INFRASTRUCTURE PERMITS FOR
DATA CENTER DEVELOPMENTS WITHIN THE CITY OF MEMPHIS
WHEREAS, pursuant to Tennessee Code Annotated § 13-7- 201, t he Memphis City
Council possesses the authority to regulate land use, zoning, and development to protect the
public health, safety, and welfare of its citizens; and
WHEREAS, there has been substantial growth nationwide and throughout Tennessee in
the development of large -scale data centers and high -density computing facilities supporting
cloud computing, artificial intelligence, digital storage, cryptocurrency operations, and other
advanced computing technologies; and
WHEREAS, modern data centers differ significantly from traditional commercial and
industrial developments because they require exceptionally high electrical loads, extensive
backup generation systems, electrical substations, battery storage systems, mechanical cooling
equipment, water resources, telecommunications infrastructure, and continuous twenty-four-hour
operations; and
WHEREAS, these facilities may generate impacts relating to electrical infrastructure
capacity, water consumption, wastewater management, stormwater runoff, emergency services,
traffic, lighting, vibration, noise, air quality, fuel storage, public utilities, and surrounding
neighborhoods; and
WHEREAS, the Memphis and Shelby County Unified Development Code’s current
zoning regulations do not specifically classify or comprehensively regulate data center
developments as a distinct land use and therefore do not adequately address their unique
operational characteristics or community impacts; and
WHEREAS, the Memphis City Council finds that additional study is necessary before
permitting additional data center developments to ensure that appropriate zoning classifications,
siting standards, buffering requirements, operational standards, utility protections, and
environmental safeguards are established; and
WHEREAS, the Memphis City Council further finds that a temporary moratorium is
necessary to prevent applications from vesting under existing regulations while permanent
zoning amendments are developed.
NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE
CITY OF MEMPHIS:
CoM Public
DRAFT – PENDING LEGAL AND COUNCIL REVIEW
ORDINANCE NO. ______
AN ORDINANCE TO ESTABLISH A STRATEGIC LARGE -LOAD DEVELOPMENT AND
DIGITAL INFRASTRUCTURE DISTRICT PROGRAM; TO REPLACE A BLANKET DATA-
CENTER MORATORIUM WITH SOURCE -NEUTRAL, TIERED, AND TIMED REVIEW; TO
DEFINE SUBSTANTIAL COMPLIANCE; TO ADOPT A MEMPHIS WATER ASSURANCE
STANDARD AND RECURRING FISCAL FLOOR; TO REQUIRE STRATEGIC DEVELOPMENT
AGREEMENTS; TO AUTHORIZE MEMPHIS DIGITAL INFRASTRUCTURE DEVELOPMENT
DISTRICT NO. 1; AND FOR RELATED PURPOSES
WHEREAS, Memphis seeks to become a preferred location for high- value digital and strategic
large-load investment by offering faster certainty, prepared infrastructure, and a durable public bargain
rather than either unregulated first-come access or a blanket closure;
WHEREAS, the City already has agencies responsible for land use, utility service, air, water,
fire, building, and economic development, but lacks one source -neutral operating system for
extraordinary full -campus demand, recurring fiscal return, cumulative resource allocation, and
competitive public development packages;
WHEREAS, Public Chapter 961 of the Public Acts of 2026 establishes a statutory cost -
responsibility floor for defined electrical infrastructure and permits certain independent -power and
behind-the-meter arrangements, making it necessary for local land -use and development rules to
measure total site demand rather than utility load alone;
WHEREAS, Tennessee Code Annotated §§ 13-4- 310(e) and 13-3-413(e), as applicable, require
local governments to specify what constitutes substantial compliance for vested- right purposes, and
Tennessee Code Annotated, Title 7, Chapter 51, Part 22, as enacted by Public Chapter 1044 of 2026,
imposes development-service deadlines beginning January 1, 2027;
WHEREAS, the Memphis Sand aquifer is a strategic regional asset, and a verifiable low -
potable-water development standard can protect that asset while creating a commercially valuable
Memphis certification;
WHEREAS, a recurring fiscal floor, competitive site allocation, ground rent, project security,
and reinvestment in the next district create greater long -term value than reliance upon announced capital
investment or one-time contributions;
WHEREAS, the City intends to launch a prepared digital infrastructure district now through
existing City, County, and industrial -development powers, without waiting for later State enabling
legislation;
NOW, THEREFORE, BE IT ORDAINED BY THE COUNCIL OF THE CITY OF
MEMPHIS:
SECTION 1. SHORT TITLE.
This ordinance may be cited as the “Memphis Strategic Large- Load Development and Digital
Infrastructure District Ordinance.”
SECTION 2. PURPOSE AND CONSTRUCTION.
(a) The purposes of this ordinance are to:
(1) keep qualified development applications moving under enforceable, predictable standards;
(2) protect citizens, neighborhoods, utility reliability, existing customers, public finances, water
resources, and future economic options;
AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF MEMPHIS, TENNESSEE,
AMENDING ORDINANCE NO. 5367, KNOWN AS THE MEMPHIS AND SHELBY COUNTY
UNIFIED DEVELOPMENT CODE, TO ESTABLISH REGULATIONS FOR THE SITING,
INITIAL DEVELOPMENT, CONSTRUCTION, EXPANSION, ALTERATION, AND
OPERATION OF LARGE-SCALE DATA CENTERS; ESTABLISHING DATA CENTER
DEVELOPMENT STANDARDS; PROHIBITING ROUTINE EVAPORATIVE AND ONCE-
THROUGH COOLING; REQUIRING CLOSED-LOOP WATER-CIRCULATION SYSTEMS;
PROHIBITING MAJOR WITHDRAWALS OF LOCAL WATER RESOURCES FOR DATA
CENTER COOLING; REQUIRING WATER CONSERVATION AND MONITORING;
REQUIRING PROGRESSIVE USE OF RENEWABLE AND NON-CARBON ELECTRICITY;
ESTABLISHING A SCHEDULE FOR THE PHASE-OUT OF CARBON-BASED ELECTRICITY;
ESTABLISHING REQUIREMENTS FOR EXPANSION OF EXISTING DATA CENTERS;
PROVIDING FOR PUBLIC DISCLOSURE, REPORTING, ENFORCEMENT, PENALTIES, AND
OTHER MATTERS RELATED THERETO.
WHEREAS, the City Council of Memphis recognizes that large-scale data centers can require
substantial amounts of electricity, water, land, electrical infrastructure, cooling
infrastructure, and other public resources; and
WHEREAS, the City Council recognizes its responsibility to protect the health, safety,
welfare, environmental quality, water resources, neighborhoods, infrastructure, and long-
term economic interests of the residents of Memphis; and
WHEREAS, the Tennessee Department of Environment and Conservation recognizes that
local governments may address data center siting, zoning, land-use compatibility, noise,
and local infrastructure matters through local governmental processes; and
WHEREAS, the City of Memphis possesses authority to regulate land uses and zoning
within the City pursuant to applicable Tennessee law and the Memphis and Shelby County
Unified Development Code; and
WHEREAS, the Memphis and Shelby County Unified Development Code was adopted by
Ordinance No. 5367 and has been amended from time to time by the City Council; and
WHEREAS, the Memphis City Council has determined that data center development should
be subject to standards appropriate to the scale and intensity of the use; and
WHEREAS, the City Council finds that the protection of water resources is a legitimate
public purpose and that cooling technologies that continuously circulate water in closed
systems can substantially reduce water consumption; and
WHEREAS, the City Council finds that routine evaporative cooling can result in continuing
consumption of water through evaporation and can place unnecessary demands upon
municipal and regional water resources; and
WHEREAS, the City Council finds that data center electricity demand can be substantial and
that increasing reliance upon renewable and non-carbon energy sources is in the public
interest; and
WHEREAS, the City Council further finds that the costs of electrical infrastructure required
solely or primarily because of data center development should not be shifted to residential
customers or unrelated commercial customers to the extent prohibited or regulated by
Tennessee law; and
WHEREAS, the City Council enacted Ordinance No. 5982 establishing a temporary
moratorium on certain data center permits in order to provide time for the City to study
and establish appropriate permanent development standards; and
WHEREAS, the City Council now determines that permanent standards governing water,
energy, environmental sustainability, development, expansion, and infrastructure are
necessary;
NOW, THEREFORE,
BE IT ORDAINED BY THE COUNCIL OF THE CITY OF MEMPHIS, TENNESSEE:
SECTION 1.
DATA CENTER DEFINED.
The Memphis and Shelby County Unified Development Code shall be amended to establish
the following definition:
“DATA CENTER” means a building, structure, campus, or collection of buildings and
associated infrastructure principally used for the housing, operation, storage, processing,
management, transmission, or distribution of digital information through electronic
computing equipment, including servers, computer systems, artificial-intelligence
computing equipment, telecommunications equipment, network equipment, data-storage
equipment, environmental control systems, electrical systems, substations, backup power
systems, cooling systems, and related infrastructure.
A facility shall be considered a Data Center regardless of whether its computing equipment
is operated by the owner of the real property, a tenant, contractor, affiliate, subsidiary, or
other entity.
SECTION 2.
LARGE DATA CENTER.
A “LARGE DATA CENTER” means a Data Center that:
A. has a projected electrical demand of twenty (20) megawatts or greater; or
B. is designed or intended to increase electrical demand to twenty (20) megawatts or
greater within ten (10) years of initial occupancy.
The City Council may establish a lower threshold by subsequent amendment to the Unified
Development Code.
SECTION 3.
APPLICABILITY.
The requirements of this Ordinance shall apply to:
A. every new Large Data Center;
B. every new Data Center proposed after the effective date of this Ordinance;
C. every expansion of an existing Data Center that increases electrical demand, computing
capacity, building area, cooling capacity, or water demand;
D. every conversion of an existing building or property to Data Center use;
E. every new Data Center campus or expansion of an existing Data Center campus; and
F. any phased development where multiple buildings or facilities are operated under
common ownership, control, management, or utility service.
SECTION 4.
DATA CENTER DEVELOPMENT APPROVAL REQUIRED.
No person shall establish, construct, expand, enlarge, or materially modify a Data Center
unless the applicant has obtained all applicable zoning, land-use, site-plan, building, utility,
environmental, and other approvals required by the City and applicable law.
No Data Center development shall be approved unless the applicant demonstrates
compliance with this Ordinance.
SECTION 5.
DISCLOSURE OF ULTIMATE DEVELOPMENT.
Every application for a new Data Center shall disclose the maximum reasonably anticipated
development of the property, including:
A. ultimate building area;
B. ultimate electrical demand;
C. anticipated computing capacity;
D. number and capacity of cooling systems;
E. maximum anticipated water demand;
F. proposed water sources;
G. proposed wastewater discharge;
H. backup-generation capacity;
I. battery-storage capacity;
J. renewable-energy generation or procurement;
K. anticipated carbon-based electricity consumption; and
L. all known phases of future development.
No applicant shall avoid the requirements of this Ordinance by dividing a single Data
Center campus into separate buildings, ownership entities, applications, phases, or permits.
SECTION 6.
CLOSED-LOOP COOLING REQUIRED.
A. All new Data Centers shall use closed-loop cooling systems.
B. Cooling water shall be continuously circulated and reused within the cooling system.
C. The cooling system shall be designed so that water is not routinely consumed through
evaporation.
D. Once-through cooling systems are prohibited.
E. Open-loop cooling systems are prohibited.
F. Routine evaporative cooling towers are prohibited.
G. Routine cooling-water blowdown, bleed-off, or discharge is prohibited except where
specifically approved by the City Engineer as necessary for system safety or maintenance
and where the discharge complies with all applicable law.
H. Acceptable cooling technologies may include:
1.
air cooling;
2.
dry cooling;
3.
direct-to-chip cooling;
4.
rear-door heat exchangers;
5.
immersion cooling;
6.
closed-circuit cooling;
7.
other non-evaporative technologies approved by the City Engineer.
SECTION 7.
PROHIBITION ON MAJOR LOCAL WATER WITHDRAWALS.
A. No Data Center shall use groundwater, surface water, municipal drinking water, aquifer
water, river water, lake water, reservoir water, or other Local Water Resources for routine
cooling operations if the withdrawal constitutes a Major Water Withdrawal.
B. No new private well shall be constructed for the primary purpose of supplying routine
Data Center cooling.
C. No Data Center shall divert water from the Mississippi River, Wolf River, Nonconnah
Creek, groundwater aquifers, reservoirs, lakes, or other local water resources for routine
cooling operations unless expressly authorized by applicable law and separately approved
by the City following a public review.
D. The City shall favor reclaimed, recycled, captured, non-potable, or otherwise non-
freshwater sources where water is permitted for an authorized use.
E. No approval shall be granted where the proposed cooling-water demand would
materially impair the City’s ability to provide water for residential, public health, fire
protection, environmental, agricultural, or other essential purposes.
SECTION 8.
POTABLE WATER.
Routine Data Center cooling shall not use treated potable drinking water supplied through
the City’s public water system except for:
A. initial filling of an approved closed-loop cooling system;
B. replacement of unavoidable system losses;
C. emergency conditions;
D. maintenance necessary to protect equipment or public safety; or
E. another use expressly approved by the City.
No potable water shall be used for intentional evaporative cooling.
SECTION 9.
INITIAL COOLING SYSTEM FILL.
The applicant shall disclose the volume of water required to initially fill the cooling system.
The City Engineer shall determine whether the proposed initial fill can be supplied without
adversely affecting public water supply, fire protection capacity, wastewater capacity, or
other essential municipal services.
The City may require phased filling or alternative water sources when necessary to protect
municipal water capacity.
SECTION 10.
WATER CONSERVATION PLAN.
Every applicant shall submit a Water Conservation and Resource Protection Plan
containing:
A. cooling-system specifications;
B. initial water-fill requirements;
C. anticipated annual water consumption;
D. anticipated maximum daily water consumption;
E. water-source identification;
F. anticipated makeup-water requirements;
G. procedures preventing evaporation;
H. procedures preventing routine discharge;
I. leak-detection procedures;
J. water-metering procedures;
K. water-recycling procedures;
L. emergency-water procedures;
M. wastewater-management procedures; and
N. certification by a Tennessee-licensed professional engineer.
SECTION 11.
SEPARATE WATER METERING.
Every Data Center shall install meters capable of separately measuring:
A. total water entering the facility;
B. cooling-system water;
C. makeup water;
D. water used for non-cooling purposes; and
E. wastewater discharge where technically feasible.
The City shall have the right to inspect and verify such meters.
SECTION 12.
WATER REPORTING.
Every Data Center shall submit an annual report to the City containing:
A. total water consumption;
B. total cooling-water consumption;
C. makeup-water consumption;
D. water source;
E. initial cooling-system fill;
F. water lost through leakage;
G. any authorized discharge;
H. any emergency withdrawal; and
I. certification by the facility owner or authorized representative.
The City may make such information available to the public subject to applicable trade-
secret and public-records law.
SECTION 13.
RENEWABLE ENERGY REQUIREMENT.
Every new Data Center shall obtain electricity from qualifying renewable or other non-
carbon energy resources according to the following schedule:
A. Beginning upon commencement of commercial operation:
Not less than sixty percent (60%) of annual electricity consumption shall be matched by
qualifying renewable or non-carbon electricity.
B. Beginning three (3) years after commencement of commercial operation:
Not less than seventy-five percent (75%) shall be matched by qualifying renewable or non-
carbon electricity.
C. Beginning six (6) years after commencement of commercial operation:
Not less than ninety percent (90%) shall be matched by qualifying renewable or non-
carbon electricity.
D. Beginning ten (10) years after commencement of commercial operation:
One hundred percent (100%) shall be matched by qualifying renewable or non-carbon
electricity.
SECTION 14.
QUALIFYING RENEWABLE ENERGY.
Qualifying renewable electricity may include electricity generated from:
A. solar;
B. wind;
C. geothermal;
D. qualifying hydroelectric resources;
E. onsite renewable generation;
F. qualifying utility renewable-energy programs;
G. long-term renewable power-purchase agreements;
H. community renewable-energy programs; or
I. other renewable-energy procurement mechanisms approved by the City Attorney.
Renewable Energy Certificates may be used for compliance only where legally recognized
and where the certificates are retired for the benefit of the Data Center.
SECTION 15.
CARBON-BASED ELECTRICITY PHASE-OUT.
A. Routine electricity consumption from coal, petroleum, natural gas, diesel, gasoline, fuel
oil, or other fossil-fuel generation shall be progressively reduced.
B. No new Data Center shall exceed the following annual carbon-based electricity limits:
1.
Years 1-3: forty percent (40%);
2.
Years 4-6: twenty-five percent (25%);
3.
Years 7-9: ten percent (10%);
4.
Year 10 and thereafter: zero percent (0%).
C. Carbon-based backup generators shall not be considered routine electricity sources
when operated solely for emergency response, legally required testing, maintenance, or
grid emergency purposes.
SECTION 16.
FOSSIL-FUEL BACKUP GENERATORS.
A. New Data Centers shall minimize reliance upon fossil-fuel emergency generation.
B. Fossil-fuel generators may operate only:
1.
during electrical outages;
2.
during declared emergencies;
3.
during required testing;
4.
during maintenance;
5.
to protect life or critical equipment; or
6.
when required by the applicable electric utility or governmental emergency authority.
C. No fossil-fuel generator may serve as the routine primary electrical supply for a Data
Center.
D. New Data Centers shall evaluate battery storage and renewable backup generation as
alternatives to fossil-fuel generation.
SECTION 17.
EXPANSION OF EXISTING DATA CENTERS.
A. No expansion may proceed without demonstrating compliance with this Ordinance.
B. An expansion that increases the facility’s electrical demand by twenty percent (20%) or
more shall be reviewed as a new Large Data Center.
C. An expansion that increases water demand shall demonstrate that the increased demand
complies with Sections 6 through 12.
D. Replacement of cooling equipment shall comply with the closed-loop, non-evaporative
requirements of this Ordinance.
E. A facility shall not avoid these requirements through phased expansion.
SECTION 18.
EXISTING DATA CENTERS.
Existing Data Centers lawfully operating before the effective date of this Ordinance may
continue their lawful operations, subject to applicable existing law.
However, existing Data Centers shall submit to the City, within twelve (12) months of the
effective date of this Ordinance:
A. a water-use report;
B. a cooling-system description;
C. electrical consumption data;
D. renewable-energy procurement information;
E. fossil-fuel generator information;
F. maximum electrical demand;
G. maximum water demand; and
H. an expansion plan, if applicable.
No major expansion shall be approved unless the facility complies with this Ordinance.
SECTION 19.
ELECTRICAL INFRASTRUCTURE COSTS.
Nothing in this Ordinance shall authorize the City or any municipal utility to violate
Tennessee law.
To the extent permitted by law, a Data Center applicant shall identify and be responsible
for incremental electrical infrastructure costs attributable to its proposed development.
The City shall not voluntarily absorb Data Center-specific infrastructure costs where such
absorption is prohibited by Tennessee law.
The applicant shall provide documentation demonstrating the anticipated electrical
infrastructure requirements associated with the project.
SECTION 20.
GRID AND ENERGY IMPACT STATEMENT.
Before approval of a Large Data Center, the applicant shall provide:
A. projected electrical demand;
B. expected annual electricity consumption;
C. expected peak demand;
D. anticipated interconnection requirements;
E. proposed renewable-energy procurement;
F. proposed energy-storage capacity;
G. expected carbon-based electricity consumption;
H. anticipated electrical infrastructure requirements; and
I. documentation from the serving electric utility concerning available service and
anticipated infrastructure requirements, to the extent such documentation may lawfully be
obtained.
SECTION 21.
PUBLIC DISCLOSURE.
Except for information protected by applicable trade-secret law, proprietary information
law, cybersecurity requirements, or other applicable law, the City shall maintain a publicly
accessible Data Center Development Register containing:
A. approved Data Centers;
B. pending applications;
C. electrical demand;
D. projected water demand;
E. water-source information;
F. cooling technology;
G. renewable-energy percentage;
H. carbon-based electricity percentage;
I. backup-generation capacity;
J. major expansion applications; and
K. annual compliance reports.
SECTION 22.
ANNUAL COMPLIANCE CERTIFICATION.
Each Data Center shall annually certify compliance with this Ordinance.
The certification shall be signed by an authorized officer, manager, or responsible engineer
of the facility.
Knowingly submitting false information shall constitute a violation of the Memphis Code of
Ordinances.
SECTION 23.
ENFORCEMENT.
The City may enforce this Ordinance through all remedies available under the Memphis
Code of Ordinances and applicable Tennessee law.
Available remedies may include:
A. notices of violation;
B. civil penalties;
C. suspension of permits;
D. denial of expansion applications;
E. revocation of approvals where legally authorized;
F. injunctive relief;
G. recovery of enforcement costs where authorized by law; and
H. any other remedy authorized by law.
Each day of continuing violation may constitute a separate violation where permitted by
law.
SECTION 24.
PERMIT CONDITION.
Compliance with this Ordinance shall be a condition of:
A. zoning approval;
B. site-plan approval;
C. special-use approval;
D. building-permit approval;
E. certificate of occupancy;
F. approval of a material expansion; and
G. other applicable development approvals.
SECTION 25.
NO PREEMPTION OF STATE OR FEDERAL AUTHORITY.
Nothing in this Ordinance shall be construed to regulate matters exclusively reserved to the
State of Tennessee, the Tennessee Valley Authority, the Tennessee Public Utility
Commission, the Federal Energy Regulatory Commission, or the federal government.
Where state or federal law regulates electricity generation, transmission, utility rates, or
environmental permitting, this Ordinance shall operate through the City’s lawful zoning,
land-use, development, building, water, infrastructure, and permitting authority.
SECTION 26.
IMPLEMENTATION THROUGH THE UNIFIED DEVELOPMENT CODE.
The Memphis and Shelby County Unified Development Code, Ordinance No. 5367, shall be
amended as necessary to incorporate the provisions of this Ordinance into the applicable
use, development, site-plan, special-use, performance-standard, and permitting sections of
the Code.
The Division of Planning and Development, in consultation with the City Attorney,
Memphis Light, Gas and Water Division, Memphis Department of Public Works, Memphis
Department of Engineering, and other appropriate agencies, shall prepare conforming
amendments necessary to implement this Ordinance.
SECTION 27.
ADMINISTRATIVE RULES.
The Director of Planning and Development, City Engineer, Water Services Director,
Sustainability Officer, or their designees may promulgate reasonable administrative rules
necessary to administer this Ordinance.
Such rules shall not exceed the authority granted by this Ordinance or applicable law.
SECTION 28.
REVIEW OF ORDINANCE.
The City Council shall receive an annual report concerning Data Center compliance,
including:
A. water consumption;
B. water-source impacts;
C. electrical demand;
D. renewable-energy use;
E. carbon-based electricity use;
F. infrastructure costs;
G. emergency-generator operation;
H. violations;
I. enforcement actions; and
J. recommended amendments.
SECTION 29.
SEVERABILITY.
If any section, subsection, paragraph, sentence, clause, phrase, or provision of this
Ordinance is determined to be invalid or unconstitutional, such determination shall not
affect the validity of the remaining portions.
SECTION 30.
EFFECTIVE DATE.
This Ordinance shall take effect upon passage according to the procedures prescribed by
the Charter of the City of Memphis and applicable Tennessee law.
SECTION 31.
CODIFICATION.
The City Clerk is directed to cause this Ordinance to be incorporated into the Code of
Ordinances of the City of Memphis and the applicable portions of the Memphis and Shelby
County Unified Development Code.
PASSED AND ADOPTED this _____ day of ____________, 2026.
CHAIRWOMAN / CHAIRMAN
MEMPHIS CITY COUNCIL
ATTEST:
CITY COMPTROLLER / CITY CLERK
APPROVED:
MAYOR
CITY OF MEMPHIS
CoM Public
(3) create recurring and competitive economic return from extraordinary public development value;
(4) establish one source -neutral review record for the full campus, regardless of the project’s energy
supplier or ownership structure;
(5) create and market prepared digital infrastructure districts; and
(6) provide a bankable public bargain that is not reopened after approval except for default, material
modification, or lawful amendment.
(b) This ordinance supplements and does not replace the jurisdiction of MLGW, TVA, TDEC, the
Shelby County Health Department, DPD, the Fire Department, Public Works, or any State or federal
agency. No provision shall be construed to authorize the City to set a utility rate, reserve electric
capacity, approve a private power sale, or waive another agency’s permit.
SECTION 3. DEFINITIONS.
“Affiliated Facility” means a facility, phase, parcel, project entity, tenant, or power -supply arrangement
under common ownership or control, developed pursuant to a common plan, sharing material
infrastructure, or located on contiguous or proximate parcels.
“Core Computing Personal Property” means servers; processors; graphics, tensor, or other accelerators;
storage devices; network and switching equipment; racks; internal uninterruptible power and distribution
systems; and replacement, refresh, leased, affiliate- owned, or functionally equivalent equipment
primarily used for computation, artificial intelligence, data storage, or data movement.
“Covered Facility” means a new or expanded facility, campus, or integrated group of facilities primarily
used for high-density computation, artificial intelligence, cloud services, data storage, cryptocurrency or
blockchain computation, or similar digital processing, with a Maximum Site Electrical Demand of ten
megawatts or more. A telecommunications switching or network facility is excluded unless its digital-
compute load independently meets the threshold.
“Digital Infrastructure Development District” means a defined development program or area in which
public or authority- controlled land, infrastructure planning, utility studies, water solutions, rights -of-
way, standard agreements, and coordinated review are assembled and competitively offered. The term
does not by itself create a tax district or alter zoning.
“Discretionary Public Development Value” means a PILOT, public land sale or lease, option, grant,
public financing, public infrastructure commitment not available as of right, expedited district position,
or other discretionary City- controlled economic value. Ordinary permits and utility service available
under generally applicable law and rates are not Discretionary Public Development Value.
“Eligible Digital Infrastructure Expenditures” means the purchase or lease price of Core Computing
Personal Property, qualified software, cooling equipment, backup or onsite generation equipment, and
other capital equipment installed for the Facility, plus facility energy purchases, but excluding payroll,
employee benefits, debt service, taxes, land purchase price, and amounts already remitted as the State
Digital Infrastructure Growth Surcharge.
“Maximum Site Electrical Demand” or “MSED” means the greatest projected coincident electrical
demand of the complete Facility or campus during its first five years after initial operation, whether
supplied by MLGW, TVA -connected service, an independent power producer, behind -the-meter
generation, onsite generation, storage, or any combination. MSED is measured before subtracting onsite
generation or storage.
“Onsite Generation” means electric generation, cogeneration, fuel cells, turbines, engines, solar, storage-
discharge systems, or other production located on or directly serving the site. Emergency backup
CoM Public
generation remains Onsite Generation for disclosure and safety purposes even if excluded from ordinary
energy-supply calculations.
“Program Administrator” means the DPD official designated to maintain the single application record,
coordinate agency review, issue the official completeness and deficiency notices, and publish the
Resource and Return Ledger.
“Regional Growth Dividend” means the contractual payment required by Section 16 when a Covered
Facility receives Discretionary Public Development Value. It is distinct from the State Digital
Infrastructure Growth Surcharge proposed in the Tennessee Enabling Act.
“Strategic Development Agreement” or “SDA” means the integrated, enforceable agreement among the
project entity and applicable public parties governing land, infrastructure, fiscal return, development
value, performance, security, reporting, transfer, expansion, default, and remedies.
“Utility Requested Load” means the maximum firm or interruptible electric demand the applicant
requests from MLGW, excluding generation not supplied by MLGW.
“Gate Viability Finding” means the written determination required by the Master Delivery Compact that
a proposed public development package presents a material, evidence -based advantage over lawful
private or self-supplied alternatives.
“Interim Program Executive” means the accountable implementation executive designated under the
Master Delivery Compact. The Executive controls the integrated critical path and readiness
certifications but does not exercise another body’s final statutory or contractual authority.
“Competitive Boundary Model” means the independent twenty-year comparison of a representative 100-
MW campus in Memphis, Southaven/DeSoto County, and at least one other relevant market using
current taxes, incentives, utility pathways, land, water, infrastructure, schedule, and financing risk.
“Water Usage Effectiveness” or “WUE” means annual site water consumption for data- center operation
divided by annual information- technology energy use, expressed in liters per kilowatt -hour or a
successor metric approved by DPD and MLGW.
“Water-Assured Facility” means a Facility certified under Section 12 and Appendix B as satisfying the
Memphis Water Assurance Standard.
SECTION 4. SOURCE-NEUTRAL TIERS AND AGGREGATION.
(a) A Covered Facility is classified by MSED:
(1) Tier I: at least 10 MW but less than 25 MW;
(2) Tier II: at least 25 MW but less than 50 MW; and
(3) Tier III: 50 MW or more.
(b) Affiliated Facilities shall be aggregated if developed during a five -year period, under common
ownership or control, pursuant to a common plan, on contiguous or proximate parcels, or with shared
electric, water, generation, fiber, road, or other material infrastructure. The Program Administrator shall
look to substance over entity form.
(c) An applicant shall disclose the full planned campus and all phases. Deliberate segmentation or
material omission is grounds for rejection, revocation, forfeiture, and referral for enforcement.
SECTION 5. APPLICABILITY, EXISTING RIGHTS, AND MATERIAL EXPANSIONS.
(a) This ordinance applies prospectively to new Covered Facilities and to the unvested portion of an
expansion, new phase, increase in MSED or Utility Requested Load, material change in energy source,
new nonemergency Onsite Generation, or material increase in potable-water demand.
CoM Public
(b) A lawfully vested right is respected only to the extent and scope established by Tennessee law and
the approved or substantially compliant submission creating the right. A vested site does not create a
vested right to undisclosed future phases, increased load, a different energy system, a new PILOT,
public land, or other Discretionary Public Development Value.
(c) A transfer of ownership or operator does not extinguish obligations that run with an SDA, land
instrument, utility agreement, permit, or other binding approval.
SECTION 6. IMPLEMENTATION EXECUTIVE, SINGLE INTAKE, AND PROGRAM
ADMINISTRATOR.
(a) Within five business days after adoption, the Mayor shall designate the Interim Program Executive
and activate the Master Delivery Compact, subject to lawful appointment, procurement, employment,
and funding requirements.
(b) The Interim Program Executive shall maintain the integrated critical path, common data room,
authority matrix, readiness certifications, and public escalation protocol. The Executive shall not
exercise a permit, utility, tax, land, appropriation, or elected decision reserved to another body.
(c) Within five business days after the operative date, the DPD Director shall designate one Program
Administrator and one electronic application record for each Tier II and Tier III Facility.
(d) MLGW, DPD, Public Works, Fire, the Shelby County Health Department, EDGE, and other
participating agencies shall transmit comments to the Program Administrator. The Program
Administrator shall issue the City’s consolidated completeness or deficiency notice. Nothing in this
subsection transfers a final agency decision.
(e) The City shall conduct one mandatory pre -submittal conference before accepting a Tier II or Tier III
development application as substantially compliant.
SECTION 7. SUBSTANTIAL COMPLIANCE CHECKLIST.
(a) Pursuant to Tennessee Code Annotated §§ 13 -4-310(e) and 13 -3-413(e), as applicable, a Tier II or
Tier III application is not substantially compliant unless it includes each item in Appendix E, including
at minimum:
(1) legal site control and parcel identification;
(2) ownership, control, end-user, and affiliate disclosure;
(3) a full-campus conceptual plan and phase schedule;
(4) MSED, Utility Requested Load, annual ramp, and interconnection assumptions;
(5) an Energy Supply and Operations Plan disclosing all utility, independent -power, onsite, backup,
storage, fuel, and hybrid components;
(6) potable, nonpotable, reclaimed, process, peak, drought -stage, and wastewater projections, cooling
technology, and proposed WUE;
(7) noise, air, fuel, battery, fire, emergency, traffic, stormwater, and decommissioning concepts;
(8) evidence of financial capacity and payment of published study deposits;
(9) a complete list of requested Discretionary Public Development Value; and
(10) certification under penalty of applicable law that no Affiliated Facility or material phase has been
omitted.
(b) DPD shall publish the checklist before this ordinance becomes operative and may add only objective,
publicly posted technical items. No unpublished or open -ended standard may determine substantial
compliance.
CoM Public
(c) If an applicant declines a lawful extension needed to complete independent technical review, the City
shall act within applicable deadlines on the record then available and may issue a deficiency or denial
when required evidence is absent. The City shall not create an accidental approval by failing to act.
SECTION 8. TIERED AND TIMED REVIEW.
(a) Tier I. Registration, full -campus disclosure, ordinary permits, applicable operating standards, and
annual energy/water reporting. DPD shall target an initial coordinated determination within thirty
business days after a substantially compliant submission.
(b) Tier II. Applicant -funded technical review; energy- track determination; Water Assurance review;
Resource and Return Ledger; and Strategic Infrastructure Readiness Determination before final
discretionary City action. DPD shall target sixty business days after a complete technical record.
(c) Tier III. All Tier II requirements; independent infrastructure and fiscal underwriting; public
presentation of the Resource and Return Ledger; and Council ratification of any SDA or extraordinary
allocation. DPD shall target ninety business days after a complete technical record, excluding applicant -
caused delay and mandatory external process.
(d) These targets are operating commitments, not guarantees of approval or waivers of State law. The
Program Administrator shall maintain a deadline ledger under Tennessee Code Annotated § 7-51-2204
and shall issue no more deficiency reports than permitted by law.
SECTION 9. TWO ENERGY PATHS; ONE FULL-SITE RECORD.
(a) Utility -served and hybrid path. An applicant seeking any MLGW electric service shall obtain the
applicable MLGW study or readiness statement and comply with the MLGW Large -Load Service and
Capacity Policy. No City approval creates a Capacity Reservation.
(b) Self- supplied or behind-the- meter path. An applicant proposing no MLGW electric service, or
proposing Onsite Generation or an independent power producer, shall submit an Energy Supply and
Operations Plan addressing full MSED, generation technology, fuel supply, expected operating hours,
air emissions, noise, cooling and water, electrical safety, islanding, interconnection if any, emergency
operation, fire protection, fuel storage, decommissioning, and construction phasing.
(c) MLGW approval is required only to the extent required by law, contract, utility service,
interconnection, backup service, or safety. Absence of MLGW jurisdiction over a private power
purchase does not exempt the Facility from land-use, air, water, fire, building, noise, traffic, fiscal, SDA,
or other lawful local requirements.
(d) A hybrid Facility shall disclose both MSED and Utility Requested Load. The Resource and Return
Ledger shall never treat a self -supplied campus as consuming zero resources merely because Utility
Requested Load is zero.
SECTION 10. STRATEGIC INFRASTRUCTURE READINESS DETERMINATION.
(a) The Program Administrator shall issue a written determination stating whether the application
presents a credible path to satisfy land use, energy supply, water, wastewater, roads, fiber, emergency
response, fire, air, noise, lighting, stormwater, fuel, security, and decommissioning requirements.
(b) The determination incorporates, but does not duplicate or supersede, the written findings and permits
of agencies with independent jurisdiction.
(c) A favorable determination requires findings that:
(1) the project has a technically credible energy path without representing that utility capacity is
reserved;
CoM Public
(2) statutory electrical infrastructure costs and contractual incremental public costs are allocated to the
project and secured;
(3) the project can satisfy the Memphis Water Assurance Standard or has obtained the limited waiver
authorized by Section 12;
(4) the project will not materially impair critical public service or an adopted resource budget;
(5) land-use, air, noise, fire, emergency, fuel, and operating requirements can be satisfied; and
(6) all material phases, affiliates, energy sources, and public requests have been disclosed.
SECTION 11. PROJECT COST RESPONSIBILITY AND SECURITY.
(a) “Statutory Electrical Infrastructure Costs” means the capitalizable costs governed by Public Chapter
961 and successor law. Those costs shall be assigned and recovered as required by law and neutral
utility policy.
(b) “Contractual Incremental Public Costs” means additional but -for costs reasonably attributable to the
Facility, including water, wastewater, road, emergency -service, public -safety, monitoring, land,
operating, maintenance, and decommissioning exposure. Such costs may be imposed only through an
SDA, utility agreement, land instrument, incentive agreement, lawful fee supported by required cost
documentation, or other valid contract or authority.
(c) Tier II and Tier III Facilities shall provide deposits, letters of credit, guarantees, bonds, take -or-pay
obligations, completion security, decommissioning security, or other protection proportionate to public
exposure before a public entity constructs ahead of the project.
(d) Construction of the project’s required infrastructure, payment of ordinary taxes, and compliance with
law are not community benefits and shall not be counted as negotiated value.
SECTION 12. MEMPHIS WATER ASSURANCE STANDARD.
(a) A Tier II or Tier III Facility shall be designed and operated as a Water-Assured Facility.
(b) After a commissioning period not exceeding ninety days, potable water shall not be used for routine
heat rejection or evaporative cooling at a Tier II or Tier III Facility. Permitted approaches include dry
cooling, closed- loop systems with de minimis make -up demand, reclaimed or treated wastewater,
captured stormwater, direct-to-chip or immersion systems, or another independently verified technology
meeting equal or better performance.
(c) Each Facility shall install separate meters for potable, nonpotable, reclaimed, and process water;
report monthly use and annual/peak WUE; maintain a drought -stage reduction and curtailment plan; and
fund annual independent verification.
(d) Each Tier II and Tier III application shall quantify, under published Memphis design-day
assumptions, the cooling design’s expected PUE, cooling- related peak megawatts, annual megawatt -
hours, potable and total water demand, and onsite -emissions effect relative to feasible alternatives. The
Resource and Return Ledger shall display the water savings and energy penalty or benefit together. No
cooling technology is presumed costless.
(e) As a condition of an SDA, District participation, City -controlled Discretionary Public Development
Value, MLGW water service, and City land -use approval to the extent authorized by law, a Tier II or
Tier III Facility shall not rely on a new direct withdrawal from the Memphis Sand aquifer for routine
process or cooling use unless: (1) every permit and approval required from the Shelby County Health
Department, the Groundwater Quality Control Board, TDEC, and any other competent authority has
been obtained; and (2) the Council approves a time -limited SDA exception by a two- thirds vote after
public hearing and written findings of necessity, monitoring, capacity, and no superior alternative. The
CoM Public
Council does not issue or substitute for a well permit, and this subsection does not displace another
agency’s jurisdiction.
(f) The Council may grant a time -limited potable-water waiver for no more than three years by a two -
thirds vote only upon findings that:
(1) no technically and commercially reasonable nonpotable or dry alternative can be available on the
required schedule;
(2) MLGW confirms sufficient capacity without impairing critical or ordinary customer needs;
(3) the SDA establishes a binding WUE ceiling, separate metering, drought curtailment, and a funded
conversion plan;
(4) the applicant finances or provides an equivalent nonpotable -water, conservation, or system-capacity
improvement; and
(5) the waiver is necessary to secure demonstrably superior long-term regional value.
(g) DPD and MLGW shall publish the technical schedule in Appendix B, update measurement protocols
administratively, and issue a public “Memphis Water -Assured” certification only after independent
verification. Confidential infrastructure -security details may be protected as allowed by law, but
aggregate use, PUE, and performance shall be public.
SECTION 13. RECURRING FISCAL FLOOR.
(a) No City-approved or City-recommended PILOT, lease, incentive, or other discretionary arrangement
for a Covered Facility shall reduce the annual City payment attributable to Core Computing Personal
Property below one hundred percent of the ad valorem tax that would be due if the property were
privately owned and fully taxable.
(b) The annual City payment attributable to land shall be one hundred percent of the ordinary City ad
valorem tax equivalent. The annual City payment attributable to cooling, backup or nonemergency
generation, storage, and other support personal property shall be at least fifty percent of the ordinary
City ad valorem tax equivalent. The annual payment attributable to other real -property improvements
shall be at least twenty-five percent of the ordinary City ad valorem tax equivalent.
(c) Core Computing Personal Property includes every replacement, refresh, upgrade, leased asset,
affiliate-owned asset, and functionally equivalent item placed in service during the term. A change in
owner, lessor, affiliate, assessment classification, or equipment cycle does not reset or evade the floor.
(d) The minimum is a floor, not an entitlement. A competitive award may require higher payments. The
City shall evaluate twenty-year net present value and recurring annual yield, but no year may fall below
the applicable floor.
(e) Ordinary taxes and minimum PILOT payments shall not be represented as community benefits. A
reduction from a requested abatement is not a negotiated contribution.
(f) The City shall not recommend a joint City -County PILOT inconsistent with this Section. County
participation and the County share are governed by the Shelby County Companion Measure.
SECTION 14. REGIONAL RESOURCE AND RETURN LEDGER.
(a) The Program Administrator shall publish a project ledger for each Tier II and Tier III Facility, using
assumptions certified by the applicant and reviewed by an independent underwriter for Tier III.
(b) The Ledger shall separately disclose at least:
(1) twenty-year net public fiscal value and recurring annual public revenue;
(2) Utility Requested Load, MSED, load ramp, cooling- related peak megawatts and annual megawatt -
hours under Memphis design conditions, and flexibility or curtailment value;
CoM Public
(3) potable, nonpotable, reclaimed, peak, and drought -stage water demand, WUE, and the paired
energy-water tradeoff of the selected cooling design;
(4) acreage, land-control structure, public infrastructure exposure, and useful infrastructure retained for
future users;
(5) Onsite Generation, expected operating hours, fuel source, air/noise burden, storage, and resilience;
(6) ground rent, option fees, reservation deposits, bid premium, Growth Dividend, and other direct
consideration;
(7) permanent payroll, local procurement, workforce, public-compute, research, and supplier-ecosystem
value;
(8) financial strength, construction certainty, default security, and stranded-asset risk; and
(9) the opportunity and option value surrendered by committing land, capacity, water, infrastructure, or
public credit.
(c) No single score is dispositive. A project must first satisfy hard floors; it must fit within adopted
resource budgets; and only then may it compete on return, performance, speed, and strategic value.
SECTION 15. STRATEGIC DEVELOPMENT AGREEMENT.
(a) A Tier III Facility, and a Tier II Facility receiving material Discretionary Public Development Value,
shall execute an SDA before receiving the value or final extraordinary City approval.
(b) The SDA shall include, as applicable:
(1) site, option, lease, ground-rent, and public-infrastructure terms;
(2) MSED, Utility Requested Load, energy source, water envelope, expansion, and transfer restrictions;
(3) statutory and contractual cost responsibility;
(4) recurring fiscal floor and Growth Dividend;
(5) construction, financing, procurement, energization, employment, and operational milestones;
(6) deposits, guarantees, letters of credit, take -or-pay, forfeiture, reversion, clawback, and liquidated-
damages terms;
(7) water, air, noise, fire, emergency, security, monitoring, and decommissioning obligations;
(8) local procurement, workforce, supplier, public -compute, research, or host -area commitments
included in the competitive award;
(9) public reporting, audit rights, change control, and remedies; and
(10) a project -certainty covenant that the public parties will not reopen the ratified economic terms
absent default, material modification, fraud, or lawful amendment.
(c) Professional staff may negotiate. The Council shall ratify an SDA after public presentation of
material economic terms. County ratification is required when County taxes, property, infrastructure, or
discretionary value are involved.
SECTION 16. CONTRACTUAL REGIONAL GROWTH DIVIDEND.
(a) A Tier II or Tier III Facility receiving Discretionary Public Development Value shall pay a Regional
Growth Dividend equal to one-half of one percent of Eligible Digital Infrastructure Expenditures, unless
the competitive award requires a higher payment.
(b) The payment is contractual consideration for discretionary value and is not imposed solely as a
condition of an ordinary permit available as of right.
CoM Public
(c) The Dividend shall be calculated and paid quarterly, with officer certification, related -party rules,
audit rights, and record retention. Payroll is excluded. Ordinary taxes, statutory infrastructure costs,
contractual incremental public costs, and legal compliance are not credits.
(d) When the State Digital Infrastructure Growth Surcharge becomes effective on the same base, the
contractual payment is reduced dollar -for-dollar only to prevent duplicate payment, unless the bidder
expressly offered an additional amount above the required floor.
(e) City receipts shall be deposited in a restricted Strategic Digital Infrastructure Fund and used for
prepared districts, shared infrastructure, water alternatives, fiber, resilience, public compute , workforce,
and other capacity -building purposes. General -fund transfer is prohibited except by later ordinance
stating the specific emergency and amount.
SECTION 17. MEMPHIS DIGITAL INFRASTRUCTURE DEVELOPMENT DISTRICT NO. 1.
(a) The City hereby authorizes the creation and immediate development of Memphis Digital
Infrastructure Development District No. 1 through EDGE/IDB or another lawful City- County vehicle
using existing powers.
(b) Within fifteen days, the Mayor shall transmit to the Council and EDGE/IDB:
(1) a site -selection protocol emphasizing industrial compatibility, separation from residential uses,
electric and gas pathways, reclaimed -water potential, fiber, roads, emergency access, environmental
baseline, and expansion;
(2) an initial predevelopment budget and funding resolution;
(3) an independent underwriting and engineering procurement plan; and
(4) a proposed City-County participation agreement.
(c) Within fifteen business days, MLGW shall provide the preliminary District Deliverability Inventory
required by the Master Delivery Compact. The inventory is not a reservation or service commitment.
(d) Within forty -five days, EDGE/IDB shall shortlist candidate sites through an open RFQ or
comparable public process. Within seventy-five days, it shall seek option, ground- lease, or other control
over one preferred site, subject to due diligence and public approval where required.
(e) No competitive solicitation may be released until the Interim Program Executive issues a positive
Gate Viability Finding and the independent underwriter completes the Competitive Boundary Model. If
those prerequisites are satisfied, EDGE/IDB shall publish the development package and competitive
solicitation no later than Day 120.
(f) No City, EDGE/IDB, or project representative may describe District No. 1 service as accelerated,
priority, firm, or faster, or state an energization date, without a written MLGW basis and the Interim
Program Executive’s certification that the public statement is supported by the current record.
(g) “Build ahead” during the interim means site control, surveys, baseline studies, preliminary
engineering, utility studies, water strategy, rights -of-way, permits capable of being obtained before
tenant selection, standard agreements, and long- lead procurement rights. No general -obligation debt or
full speculative infrastructure construction is authorized without a separate public financing decision.
(h) Public or authority ownership with long- term ground leasing is preferred. A sale requires written
findings that it produces greater risk-adjusted value and preserves performance and reversion rights.
(i) The district solicitation shall publish the hard floors, verified resource envelope, water standard,
fiscal floor, standard SDA, bid security, evaluation method, and decision schedule. Qualified bidders
compete for a finite position; no unsolicited announcement creates priority.
CoM Public
SECTION 18. INDEPENDENT UNDERWRITING AND CONFLICT FIREWALL.
(a) Recruitment and advocacy staff may develop prospects but shall not make the sole fiscal, resource,
or risk determination.
(b) A Tier III SDA or district award requires an independent fiscal and infrastructure underwriting report
and written conflict disclosures from decision participants.
(c) Material contacts, bid criteria, evaluated terms, and final rationale shall be documented. Bona fide
trade secrets and infrastructure-security information may be protected only as allowed by law.
SECTION 19. MILESTONES, WAREHOUSING, AND FORFEITURE.
(a) No land option, district position, public commitment, or utility reservation may be held indefinitely.
Each agreement shall contain financing, construction, procurement, and operation milestones.
(b) Missed milestones cause automatic reduction, release, forfeiture, or reversion unless the responsible
body grants a written, time-limited extension based on circumstances beyond the applicant’s control and
continued superior public value.
(c) A district or capacity position is nontransferable without written approval and updated underwriting.
The public parties may capture transfer value and may reject a transfer that weakens security,
performance, or strategic return.
SECTION 20. OPERATING, REPORTING, AND ENFORCEMENT.
(a) Tier II and Tier III Facilities shall provide annual reports on energy source and demand, water and
WUE, equipment value and refresh, employment and procurement commitments, public payments,
emissions and generator operation where lawfully reportable, incidents, and material changes.
(b) The City may inspect, audit, require corrective action, suspend discretionary benefits, draw security,
impose contract remedies, or seek injunctive relief for material noncompliance. Permit enforcement
remains with the responsible agency.
(c) The Program Administrator shall publish an annual regional dashboard showing aggregate
committed MSED, Utility Requested Load, water demand, recurring revenue, district positions, useful
infrastructure, and remaining adopted resource budgets, with lawful security redactions.
SECTION 21. PROJECT CERTAINTY.
Once a Facility has received final approvals and executed all required agreements, the City shall
administer those approvals according to their terms. Political reconsideration alone is not grounds to
reopen a lawful agreement. Material expansion, default, misrepresentation, ownership transfer where
approval is required, or changed operations remains subject to review.
SECTION 22. PERMANENT SYSTEM DELIVERABLES.
Within one hundred eighty days, the Mayor, DPD, MLGW, EDGE/IDB, and participating County
officials shall submit: (1) permanent UDC text; (2) the first regional resource budget; (3) District No. 1
status and financing plan; (4) the permanent Authority transition plan; (5) the State legislative package;
and (6) an audit of every serious Tier II or Tier III inquiry and the status of any claimed vested right.
SECTION 23. EFFECTIVE DATE; MORATORIUM REPLACEMENT; NO GAP.
(a) This ordinance becomes operative only when:
(1) the City has activated the Master Delivery Compact, designated the Interim Program Executive, and
opened the common implementation record;
(2) DPD has published the Section 7 checklist and designated the Program Administrator;
CoM Public
(3) the MLGW Large -Load Service and Capacity Policy, or an interim equivalent approved by the
proper authority, is effective; and
(4) the Council Attorney certifies the coordinated effective date and procedural route.
(b) At the exact time this ordinance becomes operative, the pending data -center moratorium is
withdrawn, repealed, superseded, or terminated through the procedurally appropriate action. There shall
be no interval in which the moratorium is absent and the replacement standards are not operative.
(c) If a severable provision is enjoined or invalidated, remaining provisions continue. If a core no- gap
provision cannot legally become operative, the Council shall use the narrow sixty- day Tier III fallback
described in the Action Plan until corrected.
SECTION 1. DEFINITIONS
Data Center means any building, structure, campus, or facility primarily designed for housing,
operating, or maintaining computer servers, data storage equipment, networking equipment,
telecommunications infrastructure, or other electronic systems used for processing, transmitting,
or storing digital information, together with all associated cooling systems, backup generators,
substations, battery storage, mechanical equipment, and supporting infrastructure.
High-Density Computing Facility means any facility engaged primarily in artificial intelligence
processing, cryptocurrency mining, commercial server farming, or other computing activities
requiring substantial electrical demand or specialized computing equipment.
SECTION 2. TEMPORARY MORATORIUM
Beginning on the effective date of this Ordinance, the City of Memphis shall continue to accept
applications for the limited purpose of docketing and completeness review, but shall not process,
schedule, hear, approve, or issue any approval identified below during the moratorium. All
review deadlines otherwise applicable under state law, the Memphis and Shelby County Unified
Development Code, or administrative rule are tolled for the duration of this moratorium. The
Memphis and Shelby County Division of Planning and Development shall not process the
following for any new Data Center or High- Density Computing Facility located within the c ity
limits of the City of Memphis for the duration of the temporary moratorium:
• Rezoning applications;
• Planned development applications;
• Special use permits;
• Conditional use permits;
• Site plan approvals;
• Building permits;
• Grading permits;
• Land disturbance permits; or
• Any other discretionary land use approval
No City department, board, commission, agency, or official shall accept or approve such
applications during the duration of this moratorium.
SECTION 3. EXEMPTIONS
This Ordinance shall not apply to:
1. Existing lawfully operating data centers that do not expand their building footprint,
electrical demand, utility capacity, or operational intensity; and
2. Applications that were legally vested pursuant to applicable local and state laws prior to
the introduction of this Ordinance;
3. Routine maintenance, repair, replacement, or modernization of existing facilities that
does not materially increase operational impacts.
4. Accessory Computing Use Exclusion: A data center or high-density computing facility
does not include computer servers, data storage equipment, networking equipment,
telecommunications equipment, or related computing infrastructure that is accessory or
incidental to another lawful principal use of the property and primarily serves the
operational needs of that principal use. This exclusion includes, without limitation,
computing infrastructure accessory to hospitals and healthcare facilities, financial
institutions, educational institutions, governmental facilities, offices, retail
establishments, manufacturing facilities, telecommunications facilities, and similar
principal uses.
5. The Memphis City Council may grant a waiver upon written findings that strict
application would deny the applicant of all economically viable uses of the property . The
applicant may initiate the waiver process through the Memphis and Shelby County
Division of Planning and Development by utilizing the case appeal process to the
Council.
SECTION 4. STUDY
During the moratorium period, the Memphis and Shelby County Division of Planning and
Development, working in conjunction with a study committee consisting of a Chair and Vice
Chair who are members of the Memphis City Council, Memphis Light, Gas and Water (MLGW),
and other industry experts, shall prepare recommendations regarding permanent zoning
regulations governing Data Centers and High-Density Computing Facilities.
The study committee should evaluate, at minimum:
1. Appropriate zoning districts and permitted locations;
2. Classification of data centers by size, electrical demand, and operational intensity;
3. Minimum separation distances and buffering from residential neighborhoods, schools,
parks, hospitals, greenways, and other sensitive land uses;
4. Noise mitigation standards, including operational sound limits and acoustic studies;
5. Water consumption, cooling technologies, and conservation measures;
6. Wastewater discharge requirements;
7. Stormwater management standards;
8. Lighting and visual screening requirements;
9. Emergency access and fire protection requirements;
10. Backup generator operations and fuel storage;
11. Electrical infrastructure impacts, including substations and transmission improvements;
12. Allocation of infrastructure costs to developers to ensure public utility customers are not
responsible for costs attributable to new high-demand facilities;
13. Traffic impacts during construction and operation;
14. Environmental sustainability measures;
15. Public notification and community engagement requirements;
16. Potential capital expenditure fund for the benefit of the City of Memphis;
17. Any additional development standards necessary to ensure compatibility with
surrounding land uses;
18. Guidelines for required Community Benefits Agreements.
SECTION 5. DURATION
This moratorium shall remain in effect until the earlier of:
A. Twelve (12) months following the effective date of this Ordinance;
B. Adoption of comprehensive zoning regulations governing Data Centers and High-Density
Computing Facilities by the Memphis City Council; or
C. Repeal or amendment by subsequent ordinance of the Memphis City Council.
The City Council may extend the moratorium if additional time is reasonably necessary to
complete the study and adopt permanent regulations in the Memphis and Shelby County Unified
Development Code. The Memphis City Council requests a progress report from the Division of
Planning and Development on the proposed permanent zoning regulations within six months of
the passage of this ordinance.
SECTION 6. SEVERABILITY
The provisions of this Ordinance are hereby severable. If any of these sections, provisions,
sentences, clauses, phrases, or parts are held unconstitutional or void, the remainder of this
Ordinance shall continue in full force and effect.
SECTION 7. EFFECTIVE DATE
This Ordinance shall take effect from and after the date it shall have been passed by the Council,
signed by the Chair of the Council, certified and delivered to the Office of Mayor in writing by
the comptroller and become effective as otherwise provided by law.
Sponsors: Chairwoman
JB Smiley, Jr. Jana Swearengen -Washington
Jana Swearengen-Washington
Jerri Green
Dr. Michalyn Easter-Thomas