City of Memphis · Shelby County · meeting of Jul 21, 2026 · Agendas

Open the original document More from City of Memphis

This document is no longer listed on City of Memphis's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

MLGW Agenda Committee Discussion MLGW Committee July 21, 2026 Fiscal Consent Totals: 2 1. Total Fiscal Consent Approved Amount Year-to-Date – $163,371,421.82 Items approved by Council through 07/07/2026. 2. Total Regular/Fiscal Consent Requested Amount – $14,568,124.50 Items requested for 07/21/2026 meeting. 3. Total Regular/Fiscal Consent Year-to-Date Amount – $177,939,546.32 Total of approvals and requests through 07/21/2026 meetings. Items for July 21st Agenda Items approved by BOC on July 1st 3 1. Resolution approving the Increase (Change No. 3) to Contract No. 12540 (solicited under Contract No. 12512), Master Paving Program - Section 2 with VuCon, LLC to increase the current contract in the funded amount of $1,000,000.00. 2. Resolution approving the Increase (Change No. 2) to Contract No. 12512, Master Paving Program - Sections 1 and 3 with Lehman-Roberts Company to increase the current contract in the funded amount of $5,000,000.00. 3. Resolution awarding Contract No. 12595, LNG Storage Tank Painting to Viking Painting, LLC in the funded amount of $3,167,560.00. (SAME NIGHT MINUTES REQUESTED) 4. Resolution approving the Ratification, Increase and Renewal (Change No. 4) to Contract No. 12390, Project Portfolio Management Software Tool Acquisition with WorkOtter, Inc. to ratify, increase the contract amount, and renew the current contract in the funded amount of $196,859.40. 5. Resolution awarding Contract No. 12638, North Service Center Building 5 Roof Replacement to B Four Plied, Inc. in the funded amount of $558,242.30. 6. Resolution ratifying the award of Contract No. 12654, Samsara Telematics to Samsara, Inc. in the funded not-to-exceed amount of $4,645,462.80. Master Paving Program – Section 2 4 • Requested Funding: $1,000,000.00 • Award Duration: Increase (December 9, 2025 through December 8, 2026) • Type of Bid: Sealed Bid • Awarded to: VuCon, LLC • Plain Language Description: The project scope is to provide all labor, technical skills, tools, materials, and equipment necessary for the milling and paving repairs, paving approximately 50 miles of single- lane paving. • Impact: This change is to continue working on the single lane asphalt paving for lead service replacement jobs throughout Memphis and Shelby County, Tennessee. This will reduce the amount of time that patches remain in the city streets as well as allow MLGW to complete the paving prior to winter weather and asphalt plant shutdown. Master Paving Program – Sections 1 and 3 5 • Requested Funding: $5,000,000.00 • Award Duration: Increase (December 2, 2025 through December 1, 2026) • Type of Bid: Sealed Bid • Awarded to: Lehman-Roberts Company • Plain Language Description: This contract is to supply excavation patches asphalt milling and paving services for MLGW jobs in the City of Memphis (COM) to meet paving requirements. • Impact: This change is to continue working on the patch asphalt paving for jobs throughout Memphis and Shelby County, Tennessee. This will reduce the amount of time that patches remain in the city streets as well as allow MLGW to complete the paving prior to winter weather and asphalt plant shutdown. LNG Storage Tank Painting 6 • Requested Funding: $3,167,560.00 ($2,879,600.00 bid amount plus $287,960.00 in contingency) • Award Duration: Two (2) years from the date of the Notice to Proceed • Type of Bid: Sealed Bid • Awarded to: Viking Painting, LLC • Plain Language Description: This contract is to hire a Contractor to provide all labor, materials, equipment, transportation, preparation and construction services to paint the large LNG storage tank at MLGW’s Capleville LNG Plant per the contract specifications. • Impact: Tennessee Public Utility Commission (TPUC) is requiring the LNG storage tank be painted. This contract hires the contractor to perform that work. Project Portfolio Management Software Tool Acquisition 7 • Requested Funding: $196,859.40 • Award Duration: Fourth of four (4) annual renewals (August 1, 2026, through July 31, 2027) • Type of Bid: RFP • Awarded to: WorkOtter, Inc. • Plain Language Description: The WorkOtter project portfolio tool provides leadership with a comprehensive, real-time view of Information Services’ initiatives, enabling assessment of project status, resource utilization, and alignment with strategic organizational goals. • Impact: The WorkOtter project portfolio management tool strengthens governance by ensuring that Information Services’ initiatives are executed in compliance with established oversight requirements and are prioritized in accordance with the Senior - Level Oversight Committee’s approvals. North Service Center Building 5 Roof Replacement 8 • Requested Funding: $558,242.30 ($507,493.00 bid amount plus $50,749.30 in contingency funds) • Award Duration: One (1) year from the date of the Notice to Proceed • Type of Bid: Sealed Bid • Awarded to: B Four Plied, Inc. • Plain Language Description: This contract is to remove, demolish, and replace the existing roof on MLGW’s North Service Center Building 5 located at 1060 Tupelo St., Memphis, TN 38108. • Impact: This contract will help to provide building roof maintenance to ensure the integrity of the building and assets. Samsara Telematics 9 • Requested Funding: $4,645,462.80 (proposal amount of $4,223,148.00 plus $422,314.80 in contingency funds) • Award Duration: 60 months from the date of the Notice to Proceed • Type of Bid: Single Source Award Ratification • Awarded to: Samsara, Inc. • Plain Language Description: Samsara provides a cloud-based platform that helps organizations monitor and manage vehicles, equipment, and field operations. The service uses GPS tracking, vehicle telematics, dash cameras, and operational data to provide real-time visibility into fleet activities, driver performance, vehicle health, equipment utilization, and safety-related events. The platform helps improve safety, operational efficiency, asset management, regulatory compliance, and decision-making through data analytics, reporting, and automated alerts. • Impact: Implementation of the Samsara platform will enhance fleet safety, improve operational visibility, increase accountability, and provide actionable data to support more efficient management of MLGW vehicles and equipment. The system may also help reduce liability exposure by supporting incident investigations, exonerating employees when they are not at fault, and strengthening the utility's ability to defend against claims. Questions Reliable Today, Ready for Tomorrow Battery Energy Storage System Initiatives Overview • MLGW is working on two Battery Energy Storage Initiatives • MLGW Initiative from previous RFP (25 MW BESS) • MLGW/Seven States Initiative (100 MW BESS) MLGW Initiative • MLGW issued a Request for Proposal (RFP) • 100 MW solar with 50 MW BESS • 20 MW BESS at predetermined MLGW substation • 10 MW BESS within MLGW distribution system • MLGW received six bids • 2 bid ( 1 qualified) for solar with BESS • 4 bids (3 qualified) for 10 MW/20 MW BESS • After bid evaluations, MLGW selected to work with Lightshift for the 10 MW/20 MW BESS Seven States Initiative • Seven States Power Corporation is an energy solutions cooperative • Owned and operated by 153 local power companies (LPC) within Tennessee Valley Authority footprint which includes seven states • MLGW is a member of Seven States • Focus on custom generation, reliability as a service, and transportation infrastructure • Seven States Solar & BESS Opportunity for MLGW • MLGW and Seven States evaluation of options • Solar with BESS on the transmission system • BESS on the transmission system • BESS on the distribution system Summary • MLGW evaluated the feasibility of approximately 125 MW of distribution-connected Battery Energy Storage Systems (BESS) • MLGW Initiative (25 MW) • MLGW/Seven States Initiative (100 MW) • High-level evaluation indicates distribution- connected BESS installations are technically feasible, subject to detailed engineering and System Impact Studies • BESS will be mainly intended for peak shaving applications or during load reduction/curtailment events BESS Site Locations and Sizes • MLGW reviewed site locations for the installation of BESS within the service territory • Nine candidate substation locations were identified for conceptual interconnection • System Sizes: 10 MW, 15 MW, 20 MW • MLGW Initiative • Proposed Capacity: 25 MW • Candidate Sites: Subs 45 and 66 • MLGW/Seven States Initiative • Proposed Capacity: 100 MW • Candidate Sites: Subs 28, 43, 48, 71, 73, 74, and 89 PROPOSED BESS SITE SUMMARY • MLGW Initiative • Sub 45 – McLemore: 10 MW • Sub 66 – Winchester: 15 MW • MLGW/Seven States Initiative • Sub 28 – Winchester Rd: 10 MW • Sub 43 – Elmore Rd: 15 MW • Sub 48 – Yale Rd: 10 MW • Sub 71 – Clarke Rd: 10 MW • Sub 73 – Houston Levee: 15 MW • Sub 74 – Shelby Dr: 10 MW • Sub 89 – Mendenhall: 20 MW Financial Proposal • MLGW will consider entering into an Energy Service Storage Agreement (ESSA) with both Seven States and Lightshift • 20 Year long-term contract where Seven States or Lightshift owns, operates, and maintains the battery storage systems on MLGW property (or nearby leased property) • Preliminary economics based solely on peak shaving indicates break even to slightly positive economic benefits for both projects combined • There will be additional resiliency benefits associated with both projects Operational Strategy • BESS charges and stores energy during low demand time (overnight) • BESS discharges during high demand times to help with peak shave, reducing costs and grid strain (daytime) • Peak Shaving Objectives • Reduce utility peak demand • Reduce TVA peak billing exposure • Shift load during critical peak periods • Seasons & Peak Hours • (April – October): 1 PM – 7 PM • (November – March): 4 AM – 10 AM MLGW Initiative Milestone Tentative Timeline and Next Steps • Bids received for Request for Proposal (RFP) May 2025 • 100 MW solar/BESS, 10 MW BESS, 20 MW BESS • Completion of Bids Evaluations and Final Presentation October 2025 • Recommendation to enter negotiation with Lightshift November 2025 • 10 MW and 20 MW BESS • Terms and Conditions • Engineering and Operations for BESS interconnection • Financial Evaluations • Completion of negotiations August 2026 • Board and City Council October 2026 • Anticipated Notice to Proceed March 2027 • Commercial Operation December 2028 SEVEN STATES OVERVIEW Confidential/Not for Distribution  S even S tates Power C orporati on fi nances power pl ants, expands producti on, and moderni zes gri d i nfrastructure.  Fo rm e d in 2007 b y TVA a n d its e le ctric u tility cu sto m e rs to : (1) b e a n in-Valley so lu tio n , (2) finance and own power assets, ( 3) eliminate a d d ition a l debt to T V A , and ( 4) rel i eve pressure on T V A to i ncrease rates for ca p ita l costs.  S even S tates i s a G enerati on & T ransmi ssi on cooperati ve whose member -o wn e rs a re TVA’ s e le ctric u tility-customers.  I n 2008, S even S tates fi nanced $445M to purchase a 90% i nterest and jointly own wi th T V A the 800MW Southaven combi ned cycl e gas p la n t in Mississip p i. Se ve n Sta te s sold th e p la n t to TVA in 2013.  On the di stri buti on si de, S even S tates del i vered 222 cu m u la tive p roje cts with 80 L PC s: i nstal l ed sol ar, batteri es, 563 EV charging ports.  A warded $439M zero -interest loan and grant by USDA in 2025 to build 220MW of new battery storage. DESOTO COUNTY ORLEANS STATION MONTGOMERY BELL ROCK CITY Southaven, MS Memphis , TN Dickson, TN Chat t anooga, TN USDA New ERA Program ⚬ Designed to build energy infrastructure across rural America. ⚬ Highly competitive process available only to generation and transmission cooperatives. ⚬ Largest investment in rural electrification since 1936. ⚬ More than $14.5 billion allocated across 35 states. Seven States Award and Project Overview USDA Rural Utilities Service Financing Confidential/Not for Distribution ⚬ Owned, Operated, and Maintained by Seven States ⚬ Target Commercial Operation Date - Decem ber 2028 ⚬ Power up to 12,000 homes for 8 hours ⚬ Creates 100 New Construction Jobs ⚬ Establishes Seven States as an USDA RUS Borrower for Futur e Projects ⚬ $439,745,500 Total Award ⚬ $415,000,000 - 0% In terest Loan ⚬ $24,745,500 - No Matc h Grant ⚬ Building 220MW Battery Storage Capacity acro ss Tennessee: ⚬ MLGW (100MW) ⚬ NES (100MW) ⚬ BrightRidge (20MW) LPC Project Part ners Memphis Light, Gas & Water Division (MLGW) 100MW (400MWh) BESS Nashville Electric Service (N ES) 100MW (400MWh) BES BrightRidge 20MW (80MWh) BESS Confidential/Not for Distribution Confidential/Not for Distribution • Battery Energy Storage System (BESS) installation • Evaluating 7 sites totaling 100MW • Power up to 12,000 homes for 8 hours • Locations are on existing MLGW owned properties • BESS charges and stores energy during low demand time (overnight) and discharges during high dema nd times to help peak shave, reducing costs and grid strain (day time) • BESS is another step in building a smarter, more resilient electric grid for residents of Memphis and Shelby Cou nty. MLGW PROJECT OVERVIEW & BESS BACKGROUND Confidential/Not for Distribution • BESS are remotely monitored and operated by MLGW’s Control Room 2 4/7/365 • Batteries are charged at night, off-peak, wh en TVA rates are lower • Batteries are dispatched during periods of peak electric demand, when TV A energy prices are higher • BESS equipment can be remotely shut down in the event of malfun ction MLGW PROJECT OVERVIEW & BESS BACKGROUND Sample rendering. Final specs may vary. BESS Site Substation 28 (Winchester Road) Proposed Sit e # 1 BESS Site Substation 43 (Elmore Road) Proposed Sit e # 2 BESS Site Substation 48 (Yale Road) Proposed Sit e # 3 BESS Site Substation 71 (Clarke Road) Proposed Sit e # 4 BESS Site Substation 73 (Old Houston Levee) Proposed Sit e # 5 BESS Site Substation 74 (Shelby Drive) Proposed Sit e # 6 BESS Site Substation 89 (S. Mendenhall Road) Proposed Sit e # 7 Confidential/Not for Distribution · Financial Proposal 20 Year Life Sources of Funds: Demand and Energy Savings $212,000,000 Total Sources $212,000,000 Uses of Funds: Capacity Payments to Seven States $193,368,000 Total Uses: $193,368,000 Net LPC Margin $18,632,000 • Community Benefits Plan March 2026 - Approved • Engineering & Power Cost Study June 2026 – Ready to Submit • Finalize Documents; Begin Underwriting June 2026 • Release BESS RFP July 2026 • Release Engineering RFP September 2026 • Obtain Environmental Clearance September 2026 • Complete Underwriting; Access Funds October 2026 • Construction Start July 2027 • Commercial Operation December 2028 Milestone Timeline and Next Steps Confidential/Not for Distribution ENERGY EXPRESS PROJECT Community Engagement https://www.sevenstatespower.com/energy -express -project ---main Website: Anticipated website launch: Summer 2026 Summary Confidential/Not for Distribution • BESS improves system performance while helping manage long-term energ y costs. • This project would be another step in building a smarter, more resilient electric grid. • MLGW has identified 7 locations with 1 backup site as the most appropriate to serve the needs of customers. • Following MLGW’s coordination with all parties, MLGW staff will move forward with the project with a timeline of construction starting in July 2027 and completion in December 2028. THANK YOU 423-490-7772 info@ 7spc.com sevenstatespower.com 1 2 3 Our focus is on ensuring the health of the aquifer, production wells, and well fields under this greater threat potential 4 Where are the breaches and what impact do they pose? New investigations… 4 geochemistry / age-dating efforts 7 efforts on numerical modeling of groundwater flow or contaminant fate & transport 8 efforts on characterization of the aquifer system (inter-aquifer exchange, protection from contamination, etc.) 3 efforts focused on subsurface mapping using geophysics/drilling 3 efforts looking at shallow aquifer flow dynamics and contributing sources 2 projects focused on public education outreach 1 effort on proactive monitoring of water degradation 5 First critical driver for groundwater flow Hydraulic conductivity governs how quickly (or slowly) groundwater moves • Out of 122 historical measurements by the U.S. Geological Survey, only 23 meet accepted aquifer test standards • AQ1 conducted 9 tests in 5 well fields • MLGW’s historical records produced ~1,500 measures of Memphis aquifer storage yield (overestimate) • So far collected 1,310 samples from current MLGW drilling effort for direct measure (last 3 years) Hydraulic conductivity Shallow aquifer Confining clays (UCCU, Zilpha, Flour Island) Breach Memphis aquifer Fort Pillow aquifer Count of measurements 0 0 1 32 2 6 Aquifer compartmentalization – safety barriers AQ1 provided new well location strategies spatially and at depth (all sand) • Do faulting and clay bodies compartmentalize groundwater flow? • Defining these will ease well depth requirements (reduced cost) while providing protection from contamination *Using ERT to map the fault before drilling through it – Meeman Shelby Forest State Park 7 Aquifer compartmentalization • The Memphis aquifer is not all sand – contains clay lenses and larger clay bodies like Zilpha clay • Zilpha clay is a major unit extending south to the coast and into Texas • Fingerprint the Zilpha clay for proper identification and modeling • Zilpha does not look to be contiguous – important to identify on case-by-case basis Liliacidites sp. Rhoipites angustus Identification of pollen from Zilpha era at microscopic scale from 5,750 images Zilpha can serve as secondary protective barrier to potential contamination DIFFERENTIATING 8 Aquifer stressor complexity and predictive analyses • AQ1 emphasized study of Memphis aquifer • Shallow aquifer provides water to Memphis aquifer • UCCU historically grouped Cockfield and Cook Mountain formations into UCCU (K ≈ 0.0000001 ft/day) • ~385 well logs analyzed to reassociate sand in these formations to shallow and Memphis aquifers • UCCU thickness reduction o Impacts inter-aquifer exchange rates o Provides added saturation thickness to shallow aquifer for drying conditions Average reduction: 19.4 ft Maximum reduction: 90.6 ft 9 Memphis aquifer’s secondary recharge source • Shallow aquifer provides water to the Memphis aquifer, albeit poorer quality • Mapping aquitard breaches a major priority to address rapid exchange to Memphis aquifer • AQ1 aerial electromagnetic (AEM) survey hints at 70-100 breaches present in Shelby County • We require alternative urban-area technologies like electric resistivity tomography and sTEM as well as NASA GRACE • Focusing on open spaces and public land access, we are finding suspected breaches breach North HighlandNorth Holmes Along greenline south of Chickasaw Country Club 10 • Urban growth and industrial expansion during pre-Clean Water Act (1974) • Mapped potential contributors from Yellow Pages (1940-1999; count=12,849) and modeling plumes • Hope to collect groundwater samples between projected plumes and wellfields • Movement of contaminant from ground surface to water table faster than expected • 6 months if dryer conditions • 3 months if moister • Add 2 months to get through Loess Contaminant threats – shorter reaction time *Conducting vadose zone time of travel at Shelby Farms, Sheahan, Shaw, and Mallory 11 • Three known breaches were verified in Ensley Bottoms during AQ1 • Arsenic loves soil (immobile) more than water (mobile) • Any mobile arsenic and other heavy metals is impacted by complex pulsing of groundwater in MRVA • A stilling well monitors McKeller Lake stage • A set of two new monitoring wells are being sought in middle of Ensley Bottoms Contaminant threats – revisiting Ensley Bottoms TVA ash ponds are not the only source of arsenic in the area 12 Second Critical driver for groundwater flow • Aquifer storage plays major role in groundwater numerical modeling • Groundwater storage is modeled and understood through applied mathematics, physics, and foundational concepts under non- ideal conditions • Our aquifer system presents a wide range of complex hydrogeologic conditions requiring thoughtful consideration of storage assignment 13 July 2026 PUBLIC SAFETY UPDATE OVERVIEW OF CRIME DATA PUBLIC SAFETY UPDATE OVERVIEW OF CRIME DATA Chief Cerelyn “CJ” Davis Chief Cerelyn “CJ” Davis Memphis Police Department 2024 2025 2026 January February March April May June July 1000 2000 3000 4000 4258 3709 1929 4252 3138 1953 4195 3634 2260 4460 3842 2354 5214 3939 2395 5153 3535 2563 2108 1429 899 Part I Crime Overview Three years of Part I crime data show a consistent downward trend, driven by focused strategies, advanced technology, and strong collaboration—sustaining crime reduction into July 2026. Year-over-Year Comparison (2024-2026) Crime Data as of July 12, 2026 2025 2026 Murder Aggravated Assault Sexual Assault Robbery Burglary Larceny Motor Vehicle Thefts 2000 4000 6000 8000 10000 122 73 3493 2495 370 247 933 517 2308 1673 12205 7870 3794 1480 Crime Trends Every major crime category is trending downward Two-Year Comparison Through July 12, 2026 (2025-2026) Crime Data as of July 12, 2026 2025 2026 January February March April May June July 20000 30000 40000 50000 60000 70000 72431 56184 64014 55228 73097 65431 74895 61244 73693 63590 72427 63285 30548 25113 Calls for Service Year-End Comparison (2025-2026) As of July 12, 2026 Year‑to‑date comparisons between 2025 and 2026 show a continued downward trend in calls for service Austin Peay Station Down 34.03% Raines Station Down 35.66% Mt. Moriah Station Down 44.96% Crump Station Down 28.98% Tillman Station Down 43.48% North Main Station Down 28.45% Airways Station Down 38.66% Appling Farms Station Down 46.08% Ridgeway Station Down 38.75% CoM Public Citywide Crime Declines by Stations 2026 Year-to-Date Part I Crime Reduction As of July 12, 2026 FIREARMS Recovered Firearms: 4,035 Data‑driven strategies guide MPD’s deployment of resources to hotspots and emerging trends WARRANTS Felonies: 2,189 Misdemeanors: 2,060 CURRENCY TRAFFIC STOPS Traffic stops: 152,037 ARRESTS Felonies: 6,644 Misdemeanors: 9,729 VEHICLES Recovered stolen vehicles: 2,231 MARIJUANA Confiscated: 3,010.68 lbs METHAMPHETAMINE Confiscated: 294.30 lbs Data as of July 15, 2026 The Memphis Police Department continues to lead the Memphis Safe Operation, sustaining crime‑reduction gains by focusing on violent crime and prolific offenders. Memphis Safe Operation Seized: $1,692,015.40 COMMUNITY ENGAGEMENT The Memphis Police Department’s Community Engagement team continues to strengthen connections across the city. The division includes nine dedicated Neighborhood Watch Coordinators, along with countless support personnel involved in programs centered around the community and its citizens. There are currently 341 active Neighborhood Watch groups throughout Memphis, with participation continuing to grow each year. In 2026 alone, Community Engagement officers have knocked on more than 3,200 doors across the city, actively engaging residents and expanding Neighborhood Watch participation one conversation at a time. July 2026 THANK YOU! THANK YOU! Chief Cerelyn “CJ” Davis Chief Cerelyn “CJ” Davis Memphis Police Department ORDINANCE NO. ________ AN ORDINANCE TO AMEND ORDINANCE NO. 5856 THAT ESTABLISHED RULES AND REGULATIONS RELATING TO THE OPERATION AND REGULATION OF SHORT-TERM RENTALS IN MEMPHIS BY AMENDING SECTION 8 “COMPLIANCE” TO DETAIL ENFORCEMENT OF SHORT- TERM RENTALS REPORTED AS A “PUBLIC NUISANCE” ______________________________________________________________________________ WHEREAS, Ordinance No. 5856 was approved by the Memphis City Council on July 1, 2023, to establish rules and regulaDons relaDng to the operaDon and regulaDon of short-term rentals in Memphis; and WHEREAS, it is deemed advisable and in the best interest of the ciDzens of the City of Memphis that the City of Memphis Charter be amended by ordinance as provided by ArDcle XI, SecDon 9 of the ConsDtuDon of the State of Tennessee (Home Rule Amendment) for the purpose of conDnued operaDon and regulaDon and subsequent compliance of Short-Term Rentals in Memphis; and WHEREAS, the current regulaDons pertaining to Short-Term Rentals provides a framework for general compliance that has allowed the City of Memphis to effecDvely enforce the established rules and regulaDons of Ordinance No. 5856; however, this amendment to include TN HB 1050, which clarifies the enforcement of “public nuisance” short-term rentals that have been operaDng since 2023 and will enable the City to expand its compliance and increase its accountability of short-term rental operators; and WHEREAS, the Memphis City Council finds it is necessary to amend Ordinance No. 5856 by incorporaDng and codifying TN House Bill No. 1050, approved and signed into law on May 21 st, 2025, to provide clarity for short-term rental operators of the regulaDons they are expected to adhere to and the resulDng outcomes if the short-term rental is reported as a “public nuisance” and to inform neighbors of the enforcement parameters for short-term rentals to ensure community concerns conDnue to be effecDvely addressed. NOW, THEREFORE, BE IT ORDAINED by the Memphis City Council that SecDon 8 of Ordinance No. 5856 be amended by adding a new subsecDon (8-1) as follows: SecDon 8-1 COMPLIANCE OF SHORT-TERM RENTALS REPORTED AS A “PUBLIC NUISANCE” It is the intent of the Council of the City of Memphis that “public nuisance” complaints for short-term rentals are submibed to the Division of Planning and Development and subjected to revoked permits or prohibited use of the site as a short-term rental according to TN House Bill No. 1050 when the following circumstances are reported: “(A) Three (3) or more unrelated incidents occurring within a period of twenty- four (24) months on the same parcel of real property that result in sexually related charges and, aeer the receipt of such noDce and within twenty-four (24) months of the first of the incidents resulDng in a sexually related charge that is the subject of such noDce, another addiDonal unrelated incident occurs that results in a sexually related charge; (B) Three (3) or more unrelated incidents occurring within a period of twenty-four (24) months on the same parcel of real property that result in drug-related charges and, aeer the receipt of such noDce and within twenty-four (24) months of the first of the incidents resulDng in a drug-related charge that is the subject of such noDce, another addiDonal unrelated incident occurs that results in a drug-related charge; (C) Three (3) or more unrelated incidents occurring within a period of twenty-four (24) months on the same parcel of real property that result in assaulDve charges and, aeer the receipt of such noDce and within twenty-four (24) months of the first of the incidents resulDng in an assaulDve charge that is the subject of such noDce, another addiDonal unrelated incident occurs that results in an assaulDve charge; (D) Three (3) or more unrelated incidents occurring within a period of twenty-four (24) months on the same parcel of real property that result in firearm-related charges and, aeer the receipt of such noDce and within twenty-four (24) months of the first of the incidents resulDng in a firearm-related charge that is the subject of such noDce, another addiDonal unrelated incident occurs that results in a firearm-related charge; or (E) Three (3) or more unrelated incidents occurring within a period of thirty-six (36) months on the same parcel of real property that HB1050 result in property- related or juvenile-related charges and, aeer the receipt of such noDce and within thirty-six (36) months of the first of the incidents resulDng in a property-related or juvenile-related charge that is the subject of such noDce, another addiDonal unrelated incident occurs that results in a property-related or juvenile-related charge. If, upon the trial, the existence of a nuisance is established under § 29-3-101 (f) and, following an order of abatement, an addiDonal incident occurs on the same parcel of real property that results in the type of charges that resulted in the original nuisance finding, then one (1) addiDonal incident is prima facie evidence of a nuisance per se and the existence thereof for which any of the respecDve officers or persons named in § 29-3-102 in the name of the state may avail themselves of any remedies available at law or in equity. If the court finds a nuisance as described in subdivision (f)(1) and the person or enDty keeping, maintaining, or carrying on such nuisance is the person or enDty who was subject to the previous order of abatement, then, in addiDon to the remedies available at law or in equity, the court may require the person or enDty keeping, maintaining, or carrying on such nuisance to pay statutory damages in an amount not less than one thousand dollars ($1,000) and not more than fiey thousand dollars ($50,000) to any person who owns real property within the zip code in which the nuisance exists and who files a claim with the court alleging that the person's property value was damaged by the conDnued existence of the nuisance.” BE IT FURTHER ORDAINED, that if any clause, secDon, paragraph, sentence or part of this Ordinance shall be held or declared to be unconsDtuDonal and void, it shall not affect the remaining parts of this Ordinance; it being hereby declared to be the legislaDve intent to have passed the remainder of this Ordinance notwithstanding the parts so held to be invalid, if any. BE IT FURTHER ORDAINED, that this Ordinance shall also be published by the Comptroller at the same Dme and manner as required by the City’s Charter for all ordinances adopted by the City Council. BE IT FURTHER ORDAINED, that the adopDon of this Referendum Ordinance shall take effect from and aeer the date it shall have passed by the Council, signed by the Chairman of the Council, cerDfied and delivered to the Office of the Mayor in wriDng by the Comptroller, and become effecDve as otherwise provided by law. Sponsor: Philip Spinosa, Jr .

Source: City of Memphis website. First collected Oct 27, 2026.