Capital Improvement Program (CIP) Overview

City of Memphis · Shelby County · meeting of May 15, 2026 · Other

Open the original document More from City of Memphis

This document is no longer listed on City of Memphis's website. We kept the copy we read.

Text

Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.

CIP Overview FY27 Proposed Budget FY27-31 Capital Improvement Plan $18,060,000 City Engineering 4,200,000 Executive 38,178,800 Fire Services 106,133,204 General Services 70,072,960 Housing & Community Development 26,923,000 Information Technology 12,750,000 Library Services 76,989,000 Memphis Parks 47,882,762 Police Services 256,616,044 Public Works 675,103,092 CAPITAL PROJECTS FUND 84,515,000 Public Works Sewer 53,935,000 Public Works Storm Water 138,450,000 ENTERPRISE FUND CITY ENGINEERING Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total City Engineering EN-TBD HSIP 150,000 150,000 150,000 150,000 150,000 750,000 City Engineering EN-TBD Percent-for-Art Program 400,000 400,000 400,000 400,000 400,000 2,000,000 City Engineering EN-TBD Traffic Safety Development 250,000 250,000 250,000 250,000 250,000 1,250,000 City Engineering EN-TBD Traffic Calming Devices 1,000,000 1,700,000 1,700,000 1,700,000 1,700,000 7,800,000 City Engineering EN-TBD Traffic Signal Improvements (Union at Lauderdale) 710,000 - - - - 710,000 City Engineering EN-TBD Traffic Signals FF&E (FY27) 550,000 - - - - 550,000 City Engineering EN-TBD Neighborhood Safety 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,000,000 CAPITAL PROJECTS FUND 4,060,000 3,500,000 3,500,000 3,500,000 3,500,000 18,060,000 EXECUTIVE Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Executive GA01036 Capital Reserve Animal Shelter 300,000 300,000 300,000 300,000 300,000 1,500,000 Executive GA-TBD Facility Additions - 2,700,000 - - - 2,700,000 CAPITAL PROJECTS FUND 300,000 3,000,000 300,000 300,000 300,000 4,200,000 FIRE SERVICES Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Fire Services FS02032 EMA Sirens 173,800 170,000 170,000 170,000 170,000 853,800 Fire Services FS02033 Drill Tower Improvements 3,000,000 3,000,000 - - 6,000,000 Fire Services FS04012 Personal Protective Equipment 1,300,000 1,300,000 1,300,000 1,300,000 1,300,000 6,500,000 Fire Services FS25001 New Fire Station 28 6,000,000 2,125,000 8,125,000 Fire Services FS25002 Gender Separation 260,000 3,860,000 3,860,000 3,860,000 3,860,000 15,700,000 Fire Services FS25004 BRIC Grant - Project 52 1,000,000 - - - - 1,000,000 CAPITAL PROJECTS FUND 2,733,800 14,330,000 10,455,000 5,330,000 5,330,000 38,178,800 GENERAL SERVICES Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total General Services GS-TBD FY27 CAQ Police 6,295,000 4,500,000 4,000,000 4,000,000 4,000,000 22,795,000 General Services GS-TBD FY27 CAQ Fire 3,070,253 5,000,000 5,000,000 5,000,000 5,000,000 23,070,253 General Services GS-TBD FY27 CAQ Public Works - Street Maintenance 1,257,487 - - 250,000 500,000 2,007,487 General Services GS-TBD FY27 CAQ Public Works - ROW Maintenenance 263,477 - 263,477 General Services GS-TBD FY27 CAQ Community Enhancement - Grounds Services 86,708 - 75,000 75,000 75,000 311,708 General Services GS-TBD FY27 CAQ Engineering 45,000 - 100,000 100,000 100,000 345,000 General Services GS-TBD FY27 CAQ Memphis Animal Shelter 95,000 95,000 General Services GS-TBD FY27 CAQ PARKS 50,000 - 100,000 300,000 300,000 750,000 General Services GS-TBD FY27 CAQ GS - Prop Maint 191,284 191,284 General Services GS-TBD FY27 CAQ GS - Grounds Maintenance 49,000 - 50,000 50,000 35,000 184,000 General Services GS-TBD FY27 CAQ GS - Fleet Management 329,010 - 200,000 200,000 200,000 929,010 General Services GS-TBD FY27 CAQ GS - City Hall Ops 120,000 - 50,000 170,000 GENERAL SERVICES Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total General Services GS-TBD FY27 CAQ Community Enhancement - Public Service Corps 52,000 - 60,000 60,000 60,000 232,000 General Services GS-TBD FY27 CAQ Library 58,985 - 80,000 100,000 100,000 338,985 General Services GS24101 Roofing CIP Major Modification Projects - 1,000,000 1,000,000 General Services GS24102 Electrical CIP Major Modification Projects 1,000,000 3,000,000 3,000,000 3,000,000 3,000,000 13,000,000 General Services GS23103 Plumbing CIP Major Modification Project 1,000,000 1,500,000 1,500,000 1,500,000 1,500,000 7,000,000 General Services GS24104 HVAC CIP Major Modification Projects 700,000 1,400,000 1,400,000 1,400,000 1,400,000 6,300,000 General Services GS24105 Carpentry CIP Major Modification Project 600,000 800,000 800,000 800,000 800,000 3,800,000 General Services GS22202 Operation City Hall 1,500,000 3,000,000 4,000,000 3,000,000 500,000 12,000,000 General Services GS01049 Coke: City of Memphis Municipal Complex 2 - 2,500,000 1,000,000 1,000,000 1,000,000 5,500,000 General Services GS20170 Public Safety Building: 170 N Main 1,000,000 700,000 500,000 500,000 500,000 3,200,000 General Services GS24107 Emergency Contingency: Break/Fix 650,000 500,000 500,000 500,000 500,000 2,650,000 CAPITAL PROJECTS FUND 18,413,204 23,900,000 22,415,000 21,835,000 19,570,000 106,133,204 HOUSING & COMMUNITY DEVELOPMENT Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Housing and Community Development CD01103 Hospitality Hub North - 1,500,000 - - - 1,500,000 Housing and Community Development CD01104 Southwest Twin 13,672,960 11,000,000 - - - 24,672,960 Housing and Community Development CD01105 Raleigh Springs Project - 6,500,000 6,500,000 - - 13,000,000 Housing and Community Development CD01106 Liberty Park Project - - 1,400,000 - - 1,400,000 Housing and Community Development CD01107 Fairgrounds Redevelopment Project - - 1,000,000 - - 1,000,000 Housing and Community Development CD-TBD Middle Income Housing Infrastructure 1,000,000 6,000,000 6,000,000 6,000,000 5,000,000 24,000,000 Housing and Community Development CD-TBD South City Museum 500,000 2,000,000 2,000,000 4,500,000 CAPITAL PROJECTS FUND 15,172,960 27,000,000 16,900,000 6,000,000 5,000,000 70,072,960 INFORMATION TECHNOLOGY Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Information Technology IT01001 Desktop & App Infrastruc/Optim 400,000 660,000 500,000 500,000 500,000 2,560,000 Information Technology IT01002 Cyber Security Infrastructure Upgrades 480,000 500,000 500,000 500,000 500,000 2,480,000 Information Technology IT01003 Operational Infra Enhancements 650,000 650,000 Information Technology IT01004 Implementation Modernization 4,000,000 2,250,000 250,000 250,000 250,000 7,000,000 Information Technology IT01006 IT Improvement Coverline 300,000 300,000 300,000 300,000 300,000 1,500,000 Information Technology IT01009 Smart City Project - 3,183,250 3,183,250 3,183,250 3,183,250 12,733,000 CAPITAL PROJECTS FUND 5,830,000 6,893,250 4,733,250 4,733,250 4,733,250 26,923,000 LIBRARY SERVICES Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Library Services LI01035 New Parkway Village Library 1,250,000 6,500,000 7,750,000 Library Services LI01036 Library Improvement Def Maint. 1,000,000 1,000,000 1,000,000 1,000,000 1,000,000 5,000,000 CAPITAL PROJECTS FUND 2,250,000 7,500,000 1,000,000 1,000,000 1,000,000 12,750,000 MATA Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total MATA GA03001 MATA-Service Vehicles - 250,000 200,000 200,000 200,000 850,000 MATA GA03022 MATA-Adv Public Transp System - 200,000 200,000 200,000 200,000 800,000 MATA GA03023 MATA- Operations/Maint Facility - 1,890,893 1,871,429 3,762,322 MATA GA03029 Transit Amenities - 20,000 20,000 20,000 20,000 80,000 MATA GA03030 Fixed Route Vehicles - 3,030,000 2,175,000 2,175,000 2,175,000 9,555,000 MATA GA03031 Paratransit Vehicles - 287,500 287,500 287,500 287,500 1,150,000 MATA GA03032 Bus Facility - 275,000 275,000 275,000 275,000 1,100,000 CAPITAL PROJECTS FUND - 5,953,393 5,028,929 3,157,500 3,157,500 17,297,322 MEMPHIS PARKS Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Memphis Parks PK24107 Audubon Golf Clubhouse 4,000,000 - - - - 4,000,000 Memphis Parks PK-TBD Jesse Turner Park Improvements 3,100,000 400,000 - - - 3,500,000 Memphis Parks PK-TBD North Frayser Community Center Improvements 250,000 3,500,000 3,750,000 Memphis Parks PK-TBD American Way Park Improvements - 1,100,000 1,100,000 Memphis Parks PK-TBD Lester Pool Assessment & Design - 300,000 300,000 Memphis Parks PK-TBD Pine Hill Golf Course Netting 150,000 150,000 Memphis Parks PK-TBD Community Center Security - 600,000 600,000 Memphis Parks PK-TBD Raleigh CC Design & Renovation 250,000 1,100,000 1,100,000 - - 2,450,000 Memphis Parks PK-TBD Indoor Aquatic Facility Glenview 200,000 8,500,000 8,500,000 - - 17,200,000 Memphis Parks PK03004 Tennis Major Maintenance - 200,000 200,000 200,000 200,000 800,000 Memphis Parks PK07127 Wolf River Greenway Phase 5C/13 500,000 150,000 650,000 Memphis Parks PK09002 Zoo Major Maintenance 250,000 250,000 250,000 250,000 250,000 1,250,000 Memphis Parks PK-TBD Com Center Replacement- Douglass - 2,000,000 9,500,000 9,500,000 21,000,000 MEMPHIS PARKS Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Memphis Parks PK-TBD Replacement Football Field at Tobey - 600,000 3,500,000 4,100,000 Memphis Parks GA07002 MRPP Coverline 250,000 250,000 250,000 250,000 250,000 1,250,000 Memphis Parks PK12015 Parks Critical Needs Cont. 500,000 500,000 500,000 500,000 500,000 2,500,000 Memphis Parks PK-TBD Gooch Park-Multi-use Sportsfield & Track 3,389,000 - 3,389,000 Memphis Parks GS01050 Levitt Shell Improvements 750,000 - - - - 750,000 Memphis Parks PK-TBD Ridgeway Community Center Improvements - 500,000 1,250,000 6,500,000 - 8,250,000 CAPITAL PROJECTS FUND 13,589,000 16,250,000 15,150,000 17,800,000 14,200,000 76,989,000 POLICE SERVICES Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Police Services PD04031 Axon Enterprise Solution 11,000,000 11,000,000 11,000,000 33,000,000 Police Services PD04026 Helicopter Maintenance 510,000 510,000 Police Services PD-TBD New Request Helicopter Replacement (5-YR Lease Purchase est.) 2,250,000 2,250,000 1,500,000 1,500,000 7,500,000 Police Services PD04033 New Request Safety Equipment Purchase/Replacem ent 1,400,000 2,672,762 1,400,000 1,400,000 6,872,762 CAPITAL PROJECTS FUND 12,910,000 15,922,762 14,650,000 2,900,000 1,500,000 47,882,762 PUBLIC WORKS Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Public Works PW01025 Winchester/Perkins 4,000,000 4,000,000 Public Works PW01056 Holmes-Millbranch to East 3,000,000 5,000,000 5,000,000 13,000,000 Public Works PW01087 Holmes Rd/S 3rd/Horn Lake 3,000,000 5,000,000 5,000,000 13,000,000 Public Works PW01179 Holmes Road East Malone-Lamar 2,500,000 25,000,000 27,500,000 Public Works PW01255 Chelsea Avenue Greenline 1,500,000 1,500,000 Public Works PW01256 Overton Park Trail 200,000 - 200,000 Public Works PW01284 Shelby - Paul Lowery to Weaver 500,000 5,000,000 10,000,000 15,000,000 15,000,000 45,500,000 Public Works PW02015 Holmes St. Br over CSX RR 16,044 16,044 Public Works PW-TBD STBG Resurfacing - 500,000 500,000 500,000 500,000 2,000,000 Public Works PW17301 American Way Bridge Repairs - 2,000,000 2,000,000 Public Works PW17302 Fire S&L Bldg - Seismic Repair - 4,500,000 4,500,000 Public Works PW18401 Wolf River Greenway Phase 15 900,000 900,000 Public Works PW-TBD Asphalt Paving Neighborhood (Expense Recovery) 6,500,000 6,500,000 6,500,000 6,500,000 6,500,000 32,500,000 Public Works PW-TBD Asphalt Paving Streets Group 1 6,750,000 8,250,000 9,250,000 11,750,000 11,750,000 47,750,000 PUBLIC WORKS Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Public Works PW-TBD Asphalt Paving Streets Group 2 6,750,000 8,250,000 9,250,000 11,750,000 11,750,000 47,750,000 Public Works PW-TBD NEW PW-TBD Sidewalks - 500,000 500,000 500,000 500,000 2,000,000 Public Works PW-TBD Grant Assistance Sidewalk/Cost Share - 500,000 - - - 500,000 Public Works PW-TBD ADA Curb Ramp - 1,000,000 1,000,000 1,000,000 1,000,000 4,000,000 Public Works PW-TBD Bridge Repairs - 1,600,000 800,000 800,000 800,000 4,000,000 Public Works PW-TBD Asphalt Plant Rehabilitation 3,000,000 - - - - 3,000,000 Public Works PW-TBD Street Maintenance Security 300,000 - - - - 300,000 Public Works PW-TBD Street Maintenance Wash Bay 500,000 - - - - 500,000 Public Works PW-TBD Street Maintenance Master Plan 200,000 - - - - 200,000 CAPITAL PROJECTS FUND 31,116,044 42,600,000 77,300,000 57,800,000 47,800,000 256,616,044 PUBLIC WORKS - SEWER Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Public Works Sewer SW04009 Stiles Plant Modification - - - - 5,000,000 5,000,000 Public Works Sewer SW04011 Stiles WWTF Biosolids Upgrades 10,000,000 - - 30,000,000 - 40,000,000 Public Works Sewer SW05001 Sewer Assessment and Rehab - - 20,000,000 - - 20,000,000 Public Works Sewer SW05005 TDEC ARP Sewer 5,000,000 - - - - 5,000,000 Public Works Sewer SW24204 Sewer Annual CIPP 2025 2,200,000 2,200,000 - - - 4,400,000 Public Works Sewer SW-TBD 559 North Front St. - Sewer 490,000 - - - - 490,000 Public Works Sewer SW-TBD Cane Creek CIPP 5,250,000 - - - - 5,250,000 Public Works Sewer SW-TBD 54" Loos. Sewer Relocation 1,875,000 - - - - 1,875,000 Public Works Sewer SW-TBD TE Maxson Raw Sewage Pumps 1,000,000 - - - - 1,000,000 Public Works Sewer SW-TBD Gayoso PS Electrical Upgrades - Sewer 500,000 - - - - 500,000 Public Works Sewer SW-TBD Berryhill Road Unsewered Area 1,000,000 - - - - 1,000,000 ENTERPRISE FUND 27,315,000 2,200,000 20,000,000 30,000,000 5,000,000 84,515,000 PUBLIC WORKS – STORM WATER Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Public Works Storm Water ST02001 Design-ST Coverline 1,000,000 1,000,000 1,000,000 3,000,000 Public Works Storm Water ST02013 Stormwater Program Mgr 7,000,000 - - - - 7,000,000 Public Works Storm Water ST02029 Frisco Ave Detention 6,000,000 - - - - 6,000,000 Public Works Storm Water ST02037 Ash/Omar Robinson Drop Structure 1,000,000 - - - - 1,000,000 Public Works Storm Water ST03231 Citywide ST Rehab FY24-26 1,500,000 - - - - 1,500,000 Public Works Storm Water ST-TBD Curb and Gutter 500,000 - - - - 500,000 Public Works Storm Water ST03239 Storm Water CIP 2025 550,000 - - - - 550,000 Public Works Storm Water ST03244 Whitehaven Gardens CCL 3,000,000 - - - - 3,000,000 Public Works Storm Water ST-TBD Rain Gauge Network 100,000 - - - - 100,000 Public Works Storm Water ST02035 QA/QC Drainage MP Study 100,000 - - - - 100,000 Public Works Storm Water ST-TBD DMP - Point Church 500,000 - - - - 500,000 PUBLIC WORKS – STORM WATER Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Public Works Storm Water ST02033 DMP Madison Heights-Lick Creek 500,000 - - - - 500,000 Public Works Storm Water ST02034 DMP Ten-Mile 500,000 - - - - 500,000 Public Works Storm Water ST-TBD Trash Wheel @ Nonconnah 120,000 - - - - 120,000 Public Works Storm Water ST-TBD Trash Wheel @ Wolf River 120,000 - - - - 120,000 Public Works Storm Water ST-TBD Southwest Twin - Stormwater Detention 235,000 - - - - 235,000 Public Works Storm Water ST-TBD Harrison CCL R&R 5,500,000 - - - - 5,500,000 Public Works Storm Water ST03246 Chickamauga Drain Improvements 1,220,000 - - - - 1,220,000 Public Works Storm Water ST03241 2700 Summer Viaduct 650,000 - - - - 650,000 Public Works Storm Water ST-TBD Peach/Evergreen Drain Improvements 6,500,000 - - - - 6,500,000 Public Works Storm Water ST-TBD Evergreen Drain Re- Route 4,500,000 - - - - 4,500,000 Public Works Storm Water ST-TBD Tchulahoma/Bluebon net Drain Improvements 150,000 - - - - 150,000 PUBLIC WORKS – STORM WATER Division Project Number Project Name FY2027 FY2028 FY2029 FY2030 FY2031 Total Public Works Storm Water ST-TBD University Circle Drain Improvements 800,000 - - - - 800,000 Public Works Storm Water ST-TBD Wanda St. Drain Improvements 600,000 - - - - 600,000 Public Works Storm Water ST-TBD MSQ2 Project Easements 300,000 - - - - 300,000 Public Works Storm Water ST-TBD 559 North Front St. - Storm Water 490,000 - - - - 490,000 Public Works Storm Water ST03242 Gayoso PS Electrical Upgrades - Storm Water 6,000,000 - - - - 6,000,000 ENTERPRISE FUND 49,935,000 500,000 1,500,000 500,000 1,500,000 53,935,000

Source: City of Memphis website. First collected Oct 27, 2026.