Capital Investment Committee — Agenda Packet
Williamson County · Williamson County · Capital Investment Committee · meeting of Sep 24, 2026 · Agenda packets
Open the original document More from Williamson County
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Franklin
Meeting Agenda
Capital Investment Committee
Mailing Address:
109 3rd Ave S
Franklin, TN 37064
(615) 791-3217
Thursday, September 24,
2026
3:30 PM
Williamson County
Auditorium
City of Franklin Page 1
MEETING LOCATION
Williamson County Auditorium
1320 West Main Street
CALL TO ORDER
SETTING OF THE AGENDA
1. Consideration Of Changes In Agenda And Setting The Agenda
CITIZEN COMMENTS (Open for citizens to be heard on any issue or concern, including those related to
items on the agenda. Please submit a Speaker Card at the beginning of the meeting if you would like to
address the Board/Commission. If you would like to speak on an agenda item, the Chair will hold your
comment until the public comment period associated with the item. As provided by law,
Boards/Commissions shall make no decisions or consideration of action of citizen comments for items not
on the agenda, except to refer the matter to the City Administrator/Staff for administrative consideration,
or to a schedule the matter for consideration at a later date. Those addressing the Board/Commission are
requested to come to the microphone and identify themselves by name and address for the official record.
The Chair may restrict the period for public comment, including the length of the public comment period,
the number of individuals who can speak and the length of time each individual may speak. When time
allows, the standard individual public comment time is two minutes.)
Comments on agenda items may be made in person or by emailing recorder@franklintn.gov before noon
on the day of the meeting. Comments will be submitted for the record.
APPROVAL OF MINUTES
2. Consideration Of Approval Of Minutes
August 27, 2026 Capital Investment Committee
NEW BUSINESS
3. Consideration Of Resolution 2026-80, A Resolution Authorizing The Execution Of COF Contract No.
2026-0111, With M.A.Y. Construction Co. Inc. For Concrete Construction And Repair
Sponsors: Jerry Hatcher
4. Consideration Of Resolution 2026-82, A Resolution Declaring Mooney Alley As Surplus Property
Sponsors: Paul Holzen
Page 1 of 214
Capital Investment Committee Meeting Agenda September 24, 2026
5. Consideration Of Resolution 2026-84, A Resolution To Approve The On-Call Contract Professional
Services Agreements With Multiple Qualified Consultants For: Site Improvement Surety Reconciliation
Services
Sponsors: Paul Holzen, Jimmy Wiseman
6. Consideration Of DRAFT Amendment 3 To COF Contract No. 2014-0289, A Local Agency Project
Agreement With The Tennessee Department of Transportation, For The Columbia Avenue Widening
And Improvements Project (TDOT PIN 121454.00 / TDOT Agreement Number: 140204)
Sponsors: Paul Holzen, Jonathan Marston, William Banks
7. Consideration Of DRAFT COF Contract No. 2026-0371, With Fellowship Bible Church For Deferred
Sidewalk Improvements Development Agreement
Sponsors: Paul Holzen, Jimmy Wiseman
8. Consideration Of COF Contract No. 2026-0394, A Professional Services Agreement With Rummel,
Klepper & Kahl, LLP For The Final Design Of The Liberty Pike & North Royal Oaks Boulevard/Mallory
Lane Intersection Improvements Project At A Cost Not-To-Exceed $481,436
Sponsors: Paul Holzen
9. Consideration Of Amendment 1 To COF Contract No. 2026-0170, With Alliance Engineering For The
HOBAS Pipe Rehabilitation And Improvements Project In The Amount Of $223,798
Sponsors: Michelle Hatcher
10. Discussion And Presentation Of Clovercroft Road Between Murfreesboro Rd (SR-96) And Wilson Pike
(SR 252)
11. Capital Projects Dashboard And Status Updates For September 2026
Sponsors: Paul Holzen, Jonathan Marston
OTHER BUSINESS
ADJOURN
Anyone needing accommodations due to disabilities please contact the ADA Coordinator at 615-791-3277 at least 24 hours prior to
the meeting.
Page 2 of 214
City of Franklin Page 1 of 1
City of Franklin
109 3rd Ave S.
Franklin, TN 37064
(615) 791-3217
File #: 26-0768
DATE: 9/24/2026
TO: Capital Investment Committee
FROM: Jerry Hatcher, Director of Streets
SUBJECT:
Consideration Of Resolution 2026-80, A Resolution Authorizing The Execution Of COF Contract No.
2026-0111, With M.A.Y. Construction Co. Inc. For Concrete Construction And Repair
PURPOSE:
The purpose of this memorandum is to provide information to the Franklin Board of Mayor and
Aldermen (BOMA) concerning Resolution 2026-80.
BACKGROUND/STAFF COMMENTS:
The City of Franklin periodically bids out annual maintenance contractors. This contract is for
concrete construction and repair and can be used by any City department. On August 13, 2026,
sealed bids for the On-Call Annual Contract (COF Contract No. 2026-0111) were received by the
City's Streets Department and were publicly opened and read aloud. Bids were received from five (5)
bidders, with M.A.Y. Construction Co. Inc. being the apparent low bidder, with a bid amount of
$793,600.00. After careful review and tabulation of all submitted bids, City staff recommends award
of this On-Call Contract (COF Contract No. 2026-0111) to M.A.Y. Construction Co. Inc. in the amount
of $793,600.00.
FINANCIAL IMPACT:
This contract is set up on an as-needed basis, administered by the Streets Department. The bid
package was based on general use quantities by utilizing historical data. This contract is generally
funded through annual budget process.
RECOMMENDATION:
Staff recommends that Resolution 2026-80 be recommended to the Board of Mayor and Aldermen
for approval.
Page 3 of 214
RESOLUTION 2026-80
A R
ESOLUTION AUTHORIZING THE EXECUTION OF COF CONTRACT NO. 2026-0111 WITH M.A.Y.
CONSTRUCTION CO. INC. FOR ON -CALL CONTRACT FOR “CONCRETE CONSTRUCTION AND
REPAIR”
WH
EREAS, the Board of Mayor and Aldermen of the City of Franklin, Tennessee desires to move
toward the effective and efficient administration of City business; and
WH
EREAS, the City of Franklin has identified the need to maintain the integrity and safety of
City concrete pavements, curbs, and sidewalks; and
WH
EREAS, M. A. Y. Construction Co. Inc. has been selected through a competitive bidding
process as the most qualified and cost-effective provider of such services; and
WH
EREAS, the City of Franklin’s Board of Mayor and Aldermen find that it is in the best interest
of the City and its residents to enter into a contract with M. A. Y. Construction Co. Inc. to perform these
services; and
WH
EREAS, funds have been allocated and are available in the Streets Department to cover the
costs associated with the contract; and
WH
EREAS, the contract has been reviewed by the Law Department and found to be in
accordance with applicable laws and regulations.
NO
W, THEREFORE, BE IT RESOLVED BY THE BOARD OF MAYOR AND ALDERMEN OF THE CITY OF
FRANKLIN, TENNESSEE, AS FOLLOWS:
Sec
tion 1. The Board of Mayor and Aldermen of the City of Franklin, Tennessee hereby authorizes the
City Administrator to execute a COF Contract No. 2026-0111 with M. A. Y. Construction Co. Inc. for the
provision of On-Call Contract for Concrete Construction and Repair, as outlined in the attached contract
documents (or in substantially the same form as determined by the City Administrator and/or Law
Department), in an amount not to exceed $793,600.00.
Sec
tion 2. The Streets Department Director is further authorized to take any and all necessary actions to
implement and administer the terms of the COF Contract No. 2026-0111, including any amendments
thereto, provided such amendments do not increase the cost to the City.
Sec
tion 3. The City Administrator is hereby authorized to extend the contract duration by one (1) year,
up to a maximum of two (2), one (1) year extensions.
Se
ction 4. This resolution shall take effect immediately upon its passage and approval.
1
Law Dept approved 08.24.26
Page 4 of 214
IT IS SO RESOLVED AND DONE on this ____ day of _______________, 20__.
ATTEST: CITY OF FRANKLIN, TENNESSEE:
By:_____________________________ By:___________________________
Cayce Anderson Dr. Ken Moore
City Recorder Mayor
Approved as to Form:
By: _____________________________
Ronda D. Webb
Assistant City Attorney
2
Law Dept approved 08.24.26
Page 5 of 214
COF CONTRACT NO. 2026-0111
CONSTRUCTION AGREEMENT BETWEEN
OWNER AND CONTRACTOR (STIPULATED PRICE)
This Agreement is by and between the City of Franklin, Tennessee (“Owner”) and
______________________________ (“Contractor”).
Terms used in this Agreement have the meanings stated in the City of Franklin General Conditions of the
Construction Contract (“General Conditions”).
Owner and Contractor hereby agree as follows:
ARTICLE 1—WORK
1 .01 Contractor shall complete all Work as specified and indicated in the Contract Documents. The Work is
generally described as follows: On-Call Contract for Concrete Construction and Repair
1 .02 Owner will issue Work Orders to Contractor indicating quantities of Work and locations where the Work
is to be performed. The first Work Order is anticipated to be issued within 30 days after the Notice to
Proceed, and the last Work Order will be issued no later than 30 days prior to Substantial Completion,
unless otherwise agreed.
ARTICLE 2—THE PROJECT
2 .01 The Project, of which the Work under the Contract Documents is a part, is generally described as follows:
On-Call Contract for Concrete Construction and Repair
ARTICLE 3—ENGINEER
3 .01 The Owner shall utilize City of Franklin staff (“Engineer”)
as Owner’s design engineer for the Project. Engineer shall have only those duties, responsibilities, rights,
and authority assigned to Engineer in the Contract Documents.
ARTICLE 4—CONTRACT PRICE
4 .01 Conditioned upon Contractor’s performance and completion of the Work and other obligations in
accordance with the Contract Documents, Owner shall pay Contractor as set forth in Article 15 of the
General Conditions for all Work at the price(s) stated in Contractor’s Bid (attached as an exhibit to this
Agreement), subject to adjustment under the Contract Documents.
ARTICLE 5—PAYMENT PROCEDURES
5 .01 Submittal and Processing of Payments
A. Contractor shall submit Applications for Payment in accordance with Article 15 of the General
Conditions. Applications for Payment shall be processed by Owner as provided in the General
Conditions.
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 1 of 6
Law Dept approved 06.10.26
Page 6 of 214
5 .02 Final Payment
A. Upon Final Completion and Owner’s acceptance of the Work, Owner shall pay the remainder of the
Contract Price in accordance with Paragraph 15.04 of the General Conditions.
5 .03 Consent of Surety
A. Owner shall not make final payment unless Contractor submits written consent of the surety to such
payment.
ARTICLE 6—CONTRACT DOCUMENTS AND TECHNICAL DATA
6 .01 Contents of Contract Documents
A. The Contract Documents consist of all of the following:
1. This Agreement.
2. Work Orders issued under this Agreement.
3. Bonds:
a. Performance bond (together with power of attorney).
b. Payment bond (together with power of attorney).
4. Supplementary Conditions, if any.
5. General Conditions.
6. Specifications as listed in the table of contents of the project manual (copy of list attached).
7. The most recent edition of the following specifications as of the Effective Date of the Contract,
except to the extent such specifications (i) do not apply based on the nature of the Project (e.g.,
road, bridge, street, water, or sewer), or (ii) conflict with another Contract Document identified
in this Paragraph 6.01.A, in which case the conflicting provision of other Contract Document
shall take precedence and control:
a. TDOT Standard Specifications for Road and Bridge Construction.
b. City of Franklin Street Specifications.
c. City of Franklin Water and Sanitary Sewer Specifications.
8. Drawings listed on the attached sheet index.
9. Addenda (numbers ___ to ___, inclusive).
10. Exhibits to this Agreement (enumerated as follows):
a. Contractor’s Bid
b. [list other applicable exhibits]
11. The following, if issued or signed on or after the Effective Date of the Contract and not attached
hereto:
a. Work Order.
b. Work Change Directives.
c. Change Orders.
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 6
Law Dept approved 06.10.26
Page 7 of 214
d. Field Orders.
e. Warranty Bond.
B. The Contract Documents listed in Paragraph 6.01.A are incorporated by reference and are part of
the Contract whether attached to this Agreement or not.
C. There are no Contract Documents other than those listed above in this Article 6.
D. The Contract Documents may only be amended, modified, or supplemented in a writing signed by
Owner and as otherwise provided in the Contract Documents, and all such amendments,
modifications, and supplementations are limited to the matters specifically addressed in the
applicable writing. No one is authorized by Owner to orally amend, modify, supplement, or waive
any provision, or any of Owner’s or Contractor’s duties and obligations under, the Contract
Documents.
E. Unless otherwise expressly stated, where reference is made in this Agreement or the General
Conditions to a particular Paragraph or Article number, the reference refers to the corresponding
Paragraph or Article in the document in which the reference appears.
ARTICLE 7—INSURANCE LIMITS
7 .01 Contractor shall purchase and maintain the following types of insurance as more fully set forth in Article
6 of the General Conditions. Such insurance shall be written for not less than the limits set forth below.
A. Commercial General Liability:
Commercial General Liability Policy limits of not
less than:
General Aggregate $2,000,000
Products—Completed Operations Aggregate $2,000,000
Personal and Advertising Injury $1,000,000
Bodily Injury and Property Damage—Each Occurrence $1,000,000
B. Automobile Liability:
Automobile Liability Policy limits of not
less than:
Bodily Injury
Each Person $1,000,000
Each Accident $1,000,000
Property Damage
Each Accident $1,000,000
C. Worker’s Compensation and Employer’s Liability
Worker’s Compensation and Employer’s Liability Policy limits of not
less than:
State and Federal (as applicable) Statutory Limit
Employer’s Liability (accident – per occurrence) $1,000,000
Employer’s Liability (disease – policy limit) $1,000,000
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 6
Law Dept approved 06.10.26
Page 8 of 214
Worker’s Compensation and Employer’s Liability Policy limits of not
less than:
Employer’s Liability (disease – policy limit) $1,000,000
D. Umbrella or Excess Liability:
Excess or Umbrella Liability Policy limits of not
less than:
Each Occurrence $5,000,000
General Aggregate $5,000,000
ARTICLE 8—REPRESENTATIONS, CERTIFICATIONS, AND STIPULATIONS
8 .01 Contractor’s Representations
A. In order to induce Owner to enter into this Contract, Contractor makes the following
representations:
1. Contractor has examined and carefully studied the Contract Documents.
2. Contractor is familiar with all Laws and Regulations that might affect cost, progress, and
performance of the Work.
3. Contractor is aware of the general nature of work to be performed by Owner and others at the
Site that relates to the Work as indicated in the Contract Documents.
4. Contractor has given Owner written notice of all conflicts, errors, ambiguities, or discrepancies
that Contractor has discovered in the Contract Documents, and of discrepancies between Site
conditions and the Contract Documents and Technical Data, and the resolution thereof by
Owner or Engineer is acceptable to Contractor.
5. The Contract Documents are generally sufficient to indicate and convey understanding of all
requirements for performance of the Work.
6. Contractor’s entry into this Contract constitutes an incontrovertible representation by
Contractor that without exception all prices in the Agreement are premised upon performance
of the Work as required by the Contract Documents.
7. Contractor is authorized to do business in Tennessee, and is properly licensed and registered as
necessary by or with all governmental and public and quasi-public authorities having jurisdiction
over the Contractor, the Work, and the Project.
8. Contractor possesses a high level of experience, expertise, and competence in the business of
administration, construction, construction management, and superintendence of projects of the
size, complexity, and nature of the Project, and shall perform the Work with the care, skill, and
diligence of such a contractor.
8.02 Contractor’s Certifications
A. Contractor certifies that it has not engaged in corrupt, fraudulent, collusive, or coercive practices in
competing for, bidding for, or entering into the Contract. For the purposes of this paragraph:
1. “corrupt practice” means the offering, giving, receiving, or soliciting of anything of value likely
to influence the action of a public official;
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 6
Law Dept approved 06.10.26
Page 9 of 214
2. “fraudulent practice” means an intentional misrepresentation of facts made (a) to influence the
bidding or contracting process, (b) to establish Bid or Contract prices at artificial, non
competitive levels, or (c) to deprive Owner of the benefits of free and open competition;
3. “collusive practice” means a scheme or arrangement between two or more Bidders, with or
without the knowledge of Owner, a purpose of which is to establish Bid prices at artificial, non
competitive levels; and
4. “coercive practice” means harming or threatening to harm, directly or indirectly, persons or
their property to influence their participation in the bidding or contracting process.
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 5 of 6
Law Dept approved 06.10.26
Page 10 of 214
IN WITNESS WHEREOF, Owner and Contractor have signed this Agreement.
This Agreement shall be effective on ________________ , 20__ (which is the Effective Date of the Contract).
Owner: Contractor:
City of Franklin, Tennessee
(typed or printed name of organization) (typed or printed name of organization)
By: By:
Date:
(individual’s signature)
Date:
(individual’s signature)
Name:
(date signed)
Eric S. Stuckey Name:
(date signed)
Title:
(typed or printed)
City Administrator Title:
(typed or printed)
(typed or printed) (typed or printed)
Attest:
(individual’s signature)
Title:
(typed or printed)
Address for giving notices:
109 3rd Ave South
Franklin, TN 37064
Designated Representative:
Name:
(typed or printed)
Title:
(typed or printed)
Address:
Attest:
(individual’s signature)
Title:
(typed or printed)
Address for giving notices:
Designated Representative:
Name:
Title:
Address:
(typed or printed)
(typed or printed)
Phone:
Email:
Approved as to form:
Ronda Webb, Staff Attorney
Phone:
Email:
License No.:
State:
(where applicable)
EJCDC® C-520, Agreement between Owner and Contractor for Construction Contract (Stipulated Price).
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 6 of 6
Law Dept approved 06.10.26
Page 11 of 214
COF CONTRACT NO. 2026-0111
CITY OF FRANKLIN
GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
TABLE OF CONTENTS
Page
Article 1—Definitions and Terminology................................................................................................................. 1
1.01 Defined Terms ........................................................................................................................................... 1
1.02 Terminology ...............................................................................................................................................6
Article 2—Preliminary Matters ................................................................................................................................ 8
2.01 Delivery of Performance and Payment Bonds; Evidence of Insurance..............................................8
2.02 Copies of Documents ............................................................................................................................... 8
2.03 Before Starting Construction ...................................................................................................................8
2.04 Preconstruction Conference; Designated Representatives ................................................................ 8
2.05 Acceptance of Schedules ........................................................................................................................ 9
2.06 Electronic Transmittals .............................................................................................................................9
Article 3—Contract Documents: Intent, Requirements, Reuse........................................................................ 10
3.01 Intent......................................................................................................................................................... 10
3.02 Reference Standards .............................................................................................................................. 10
3.03 Reporting and Resolving Discrepancies .............................................................................................. 11
3.04 Requirements of the Contract Documents ......................................................................................... 11
3.05 Reuse of Documents .............................................................................................................................. 12
Article 4—Commencement and Progress of the Work ......................................................................................12
4.01 Commencement of Contract Times; Work Order ............................................................................. 12
4.02 Starting the Work.................................................................................................................................... 12
4.03 Reference Points ..................................................................................................................................... 12
4.04 Progress Schedule ................................................................................................................................... 13
4.05 Delays in Contractor’s Progress ............................................................................................................ 13
Article 5—Site; Subsurface and Physical Conditions; Hazardous Environmental Conditions ..................... 15
5.01 Availability of Lands ................................................................................................................................15
5.02 Use of Site and Other Areas...................................................................................................................15
5.03 Subsurface and Physical Conditions..................................................................................................... 16
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 1 of 5 Law Approved TEMPLATE 03.23.21
Law Dept approved 06.10.26
Page 12 of 214
5.04 Differing Subsurface or Physical Conditions ........................................................................................ 16
5.05 Underground Facilities............................................................................................................................ 18
5.06 Hazardous Environmental Conditions ...................................................................................................20
Article 6—Bonds and Insurance..............................................................................................................................21
6.01 Performance, Payment, and Other Bonds ........................................................................................... 21
6.02 Insurance—General Provisions...............................................................................................................22
6.03 Contractor’s Insurance.............................................................................................................................24
6.04 Builder’s Risk and Other Property Insurance ....................................................................................... 26
6.05 Property Losses; Subrogation .................................................................................................................27
6.06 Receipt and Application of Property Insurance Proceeds .................................................................28
Article 7—Contractor’s Responsibilities ...............................................................................................................28
7.01 Contractor’s Means and Methods of Construction ........................................................................... 28
7.02 Supervision and Superintendence .........................................................................................................29
7.03 Labor; Working Hours ............................................................................................................................. 29
7.04 Services, Materials, and Equipment ......................................................................................................30
7.05 “Or Equals”.................................................................................................................................................30
7.06 Substitutes .................................................................................................................................................31
7.07 Concerning Subcontractors and Suppliers............................................................................................33
7.08 Patent Fees and Royalties ....................................................................................................................... 34
7.09 Permits ....................................................................................................................................................... 34
7.10 Taxes ..........................................................................................................................................................35
7.11 Laws and Regulations...............................................................................................................................35
7.12 Record Documents....................................................................................................................................35
7.13 Safety and Protection ..............................................................................................................................36
7.14 Hazard Communication Programs .........................................................................................................37
7.15 Emergencies .............................................................................................................................................. 37
7.16 Submittals ..................................................................................................................................................37
7.17 Contractor’s General Warranty and Guarantee ..................................................................................40
7.18 Indemnification ........................................................................................................................................ 41
7.19 Delegation of Professional Design Services ..........................................................................................41
Article 8—Other Work at the Site..........................................................................................................................42
8.01 Other Work ................................................................................................................................................42
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 2 of 5 Law Approved TEMPLATE 03.23.21
Page 13 of 214
8.02 Coordination .............................................................................................................................................43
8.03 Legal Relationships...................................................................................................................................43
Article 9—Owner’s Responsibilities ...................................................................................................................... 44
9.01 Communications to Contractor .............................................................................................................44
9.02 Replacement and Role of Engineer....................................................................................................... 45
9.03 Furnish Data .............................................................................................................................................. 45
9.04 Pay When Due...........................................................................................................................................45
9.05 Lands and Easements; Reports, Tests, and Drawings.........................................................................45
9.06 Insurance................................................................................................................................................... 45
9.07 Change Orders ..........................................................................................................................................45
9.08 Inspections, Tests, and Approvals..........................................................................................................45
9.09 Limitations on Owner’s Responsibilities .............................................................................................. 45
9.10 Undisclosed Hazardous Environmental Condition.............................................................................. 46
9.11 Evidence of Financial Arrangements..................................................................................................... 46
9.12 Safety Programs ....................................................................................................................................... 46
Article 10—Engineer’s and owner’s Status During Construction .....................................................................46
10.01 Authority of Engineer..........................................................................................................................46
10.02 Visits to Site...........................................................................................................................................46
10.03 Determinations for Unit Price Work .................................................................................................46
10.04 Decisions on Requirements of Contract Documents and Acceptability of Work ......................46
10.05 Limitations on Owner’s Authority and Responsibilities.................................................................46
10.06 Compliance with Safety Program.......................................................................................................47
Article 11—Changes to the Contract .....................................................................................................................47
11.01 Amending and Supplementing the Contract ...................................................................................47
11.02 Change Orders ......................................................................................................................................47
11.03 Work Change Directives......................................................................................................................48
11.04 Field Orders ........................................................................................................................................... 48
11.05 Owner-Authorized Changes in the Work ......................................................................................... 48
11.06 Unauthorized Changes in the Work .................................................................................................. 48
11.07 Change of Contract Price ....................................................................................................................49
11.08 Change of Contract Times ...................................................................................................................50
11.09 Change Proposals ................................................................................................................................ 50
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 3 of 5 Law Approved TEMPLATE 03.23.21
Page 14 of 214
11.10 Notification to Surety........................................................................................................................51
Article 12—Claims................................................................................................................................................... 51
12.01 Claims .................................................................................................................................................... 51
Article 13—Cost of the Work; Allowances; Unit Price Work ............................................................................52
13.01 Cost of the Work .................................................................................................................................52
13.02 Allowances ........................................................................................................................................... 56
13.03 Unit Price Work ................................................................................................................................... 56
Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work .....................57
14.01 Access to Work....................................................................................................................................57
14.02 Tests, Inspections, and Approvals....................................................................................................57
14.03 Defective Work ................................................................................................................................... 58
14.04 Acceptance of Defective Work...................................................................................................... 59
14.05 Uncovering Work ............................................................................................................................. 59
14.06 Owner May Stop the Work ..............................................................................................................59
14.07 Owner May Correct Defective Work............................................................................................ 60
Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period ...........................................60
15.01 Payments............................................................................................................................................. 60
15.02 Contractor’s Warranty of Title ...................................................................................................... 63
15.03 Final Inspection ................................................................................................................................ 63
15.04 Final Completion and Payment ..................................................................................................... 63
15.05 Waiver of Claims .................................................................................................................................64
15 .06 Correction Period ...................................................................................................................... 64
Article 16—Suspension of Work and Termination ............................................................................................ 65
16 .01 Owner May Suspend Work ...................................................................................................... 65
16 .02 Contractor Default; Owner May Terminate the Contract for Cause ............................ 66
16 .03 Owner May Terminate the Contract for Convenience .................................................... 67
16 .04 Contractor May Stop Work or Terminate the Contract ................................................... 67
Article 17—Final Resolution of Disputes .............................................................................................................67
17 .01 Methods and Procedures.........................................................................................................67
Article 18—Miscellaneous ..................................................................................................................................68
18 .01 Giving Notice ........................................................................................................................... 68
18 .02 Computation of Times.............................................................................................................. 68
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 4 of 5 Law Approved TEMPLATE 03.23.21
Page 15 of 214
18.03 Cumulative Remedies ........................................................................................................................ 68
18.04 Limitation of Damages .................................................................................................................... 69
18.05 No Waiver ......................................................................................................................................... 69
18.06 Survival of Obligations ................................................................................................................... 69
18.07 Controlling Law ................................................................................................................................ 69
18.08 Assignment of Contract.................................................................................................................. 69
18.09 Successors and Assigns .......................................................................................................................69
18.10 Headings................................................................................................................................................69
EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 5 of 5 Law Approved TEMPLATE 03.23.21
Page 16 of 214
CITY OF FRANKLIN
STANDARD GENERAL CONDITIONS
OF THE CONSTRUCTION CONTRACT
ARTICLE 1—DEFINITIONS AND TERMINOLOGY
1 .01 Defined Terms
A. Wherever used in the Bidding Requirements or Contract Documents, a term printed with
initial capital letters, including the term’s singular and plural forms, shall have the meaning
indicated in the definitions in this Paragraph 1.01. In addition to terms specifically defined,
terms with initial capital letters in the Contract Documents include references to identified
articles and paragraphs, and the titles of other documents or forms.
1. Addenda—Written or graphic instruments that clarify, correct, or change the Bidding
Requirements or the proposed Contract Documents.
2. Agreement—The written instrument, signed by Owner and Contractor, that sets forth the
Contract Price and Contract Times, identifies the parties and the Engineer, and designates
the specific items that are Contract Documents.
3. Application for Payment—The document prepared by Contractor, in a form acceptable to
Owner, to request progress or final payments, and that is to be accompanied by such
supporting documentation as is required by the Contract Documents.
4. Bid —The offer of a Bidder submitted on the prescribed form setting forth the prices for
the Work to be performed.
5. Bidder—An individual or entity that submits a Bid to Owner.
6. Bidding Documents—The Bidding Requirements, the proposed Contract Documents, and
all Addenda.
7. Bidding Requirements—The Advertisement or invitation to bid, Instructions to Bidders,
Bid Bond or other Bid security, if any, the Bid Form, and the Bid with any attachments.
8. Change Order—A document that is signed by Contractor and Owner and authorizes an
addition, deletion, or revision in the Work or an adjustment in the Contract Price or the
Contract Times, or other revision to the Contract, issued on or after the Effective Date of
the Contract.
9. Change Proposal—A written request by Contractor, duly submitted in compliance with
the procedural requirements set forth herein, seeking an adjustment in Contract Price or
Contract Times; contesting an initial decision by Owner concerning the acceptability of
Work under the Contract Documents; challenging a set-off against payments due; or
seeking other relief with respect to the Contract.
10. Claim
a. A demand or assertion by Owner directly to Contractor, duly submitted in compliance
with the procedural requirements set forth herein, seeking an adjustment of Contract
Modified EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
TOC Page 1 of 69
Page 17 of 214
Price or Contract Times; contesting the acceptability of Work under the Contract
Documents; or seeking other relief with respect to the Contract.
b. A demand or assertion by Contractor directly to Owner, duly submitted in compliance
with the procedural requirements set forth herein, contesting Owner’s decision
regarding a Change Proposal.
c. A demand or assertion by Owner or Contractor, duly submitted in compliance with
the procedural requirements set forth herein, made pursuant to Paragraph 12.01.A.4,
concerning disputes arising after Owner has made a determination regarding Final
Completion.
d. A demand for money or services by a third party is not a Claim.
11. Constituents of Concern—Asbestos, petroleum, radioactive materials, polychlorinated
biphenyls (PCBs), lead-based paint (as defined by the HUD/EPA standard), hazardous
waste, or any substance, product, waste, or other material of any nature whatsoever that
is or becomes listed, regulated, or addressed pursuant to Laws and Regulations
regulating, relating to, or imposing liability or standards of conduct concerning (a)
pollution, (b) protection of human health or the environment, or (c) any hazardous, toxic,
or otherwise dangerous waste, substance, or material.
12. Contract—The entire and integrated written contract between Owner and Contractor
concerning the Work.
13. Contract Documents—Those items so designated in the Agreement (or applicable Work
Orders), and that together comprise the Contract.
14. Contract Price—The money that Owner has agreed to pay Contractor in accordance with
the Contract Documents.
15. Contract Times—The number of days or the dates by which Contractor shall: (a) achieve
Milestones, if any; (b) achieve Substantial Completion; and (c) complete the Work, as such
days or dates might be adjusted or modified under the Contract.
16. Contractor—The individual or entity with which Owner has contracted for performance
of the Work.
17. Contractor Parties—Contractor, its Subcontractors, Suppliers, and anyone directly or
indirectly employed, retained or contracted by any of them, and anyone for whose acts
any of them is responsible or liable with respect to the Project.
18. Cost of the Work—See Paragraph 13.01 for definition.
19. Critical Path—The sequence and duration of activities of Work that control the duration
of the Project.
20. Drawings—The part of the Contract Documents that graphically shows the scope, extent,
and character of the Work to be performed by Contractor.
21. Effective Date of the Contract—The date, indicated in the Agreement, on which the
Contract becomes effective.
22. Electronic Document—Any Project-related correspondence, attachments to
correspondence, data, documents, drawings, information, or graphics, including but not
limited to Shop Drawings and other Submittals, that are in an electronic or digital format.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 2 of 69
Page 18 of 214
23. Electronic Means—Electronic mail (email), upload/download from a secure Project
website, or other communications methods that allow: (a) the transmission or
communication of Electronic Documents; (b) the documentation of transmissions,
including sending and receipt; (c) printing of the transmitted Electronic Document by the
recipient; (d) the storage and archiving of the Electronic Document by sender and
recipient; and (e) the use by recipient of the Electronic Document for purposes permitted
by this Contract. Electronic Means does not include the use of text messaging, or of
Facebook, Twitter, Instagram, or similar social media services for transmission of
Electronic Documents.
24. Engineer—The individual or entity named as such in the Agreement.
25. Field Order—A written order issued by Owner that requires minor changes in the Work
but does not change the Contract Price or the Contract Times.
26. Final Completion—The stage at which all of Contractor’s obligations under the Contract
Documents, and specifically under Paragraph 15.04, have been satisfied and final
payment is due from Owner to Contractor. The terms “finally complete” and “finally
completed” as applied to the Work refer to Final Completion.
27. Hazardous Environmental Condition—The presence at the Site of Constituents of Concern
in such quantities or circumstances that might present a danger to persons or property
exposed thereto.
a. The presence at the Site of materials that are necessary for the performance of the
Work, or that are to be incorporated into the Work, and that are controlled and
contained pursuant to industry practices, Laws and Regulations, and the
requirements of the Contract, is not a Hazardous Environmental Condition.
b. The presence of Constituents of Concern that are to be removed or remediated as
part of the Work is not a Hazardous Environmental Condition.
c. The presence of Constituents of Concern that are part of the routine and obvious
working conditions at the Site, is not a Hazardous Environmental Condition.
28. Laws and Regulations; Laws or Regulations—Any and all applicable laws, statutes, rules,
regulations, ordinances, codes, and binding decrees, resolutions, and orders of any and
all governmental bodies, agencies, authorities, and courts having jurisdiction.
29. Liens—Charges, liens, security interests, or encumbrances upon Contract-related funds,
real property, or personal property.
30. Milestone—A principal event in the performance of the Work that the Contract requires
Contractor to achieve by an intermediate completion date or by a time prior to
Substantial Completion of all the Work.
31. Notice of Award—The written notice by Owner to a Bidder of Owner’s acceptance of the
Bid.
32. Notice to Proceed—A written notice by Owner to Contractor fixing the date on which the
Contract Times shall commence to run and on which Contractor shall start to perform the
Work.
33. Owner—The City of Franklin, Tennessee.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 3 of 69
Page 19 of 214
34. Owner Parties—Owner and its executives, officers, managers, board members, agents,
and employees.
35. Progress Schedule—A schedule prepared and maintained by Contractor in accordance
with the Contract, describing the sequence and duration of the activities comprising
Contractor’s obligation to accomplish the Work within the Contract Times.
36. Project—The total undertaking to be accomplished for Owner by engineers, contractors,
and others, including planning, study, design, construction, testing, commissioning, and
start-up, and of which the Work to be performed under the Contract Documents is a part.
37. Samples—Physical examples of materials, equipment, or workmanship that are
representative of some portion of the Work and that establish the standards by which
such portion of the Work shall be judged.
38. Schedule of Submittals—A schedule, prepared and maintained by Contractor in
accordance with the Contract, of required submittals and the time requirements for
review of the submittals.
39. Schedule of Values—A schedule, prepared and maintained by Contractor in accordance
with the Contract, allocating portions of the Contract Price to various portions of the Work
and used as the basis for reviewing Contractor’s Applications for Payment.
40. Shop Drawings—All drawings, diagrams, illustrations, schedules, and other data or
information specifically prepared or assembled by or for Contractor and submitted by
Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or
not, are not Drawings and are not Contract Documents.
41. Site—Lands or areas indicated in the Contract Documents as being furnished by Owner
upon which the Work is to be performed, including rights-of-way and easements, and
such other lands or areas furnished by Owner designated for the use of Contractor.
42. Specifications—The part of the Contract that consists of written requirements for
materials, equipment, systems, standards, and workmanship as applied to the Work, and
certain administrative requirements and procedural matters applicable to the Work.
43. Subcontractor—An individual or entity having a direct contract with Contractor or with
any other Subcontractor for the performance of a part of the Work.
44. Submittal—A written or graphic document, prepared by or for Contractor, that the
Contract Documents require Contractor to submit to Owner, or that is indicated as a
Submittal in the Schedule of Submittals. Submittals include but are not limited to Shop
Drawings and Samples; product data; Owner-delegated designs; sustainable design
information; information on special procedures; testing plans; results of tests and
evaluations, source quality-control testing and inspections, and field or Site quality
control testing and inspections; certifications; Suppliers’ instructions and reports; records
of delivery of spare parts and tools; operations and maintenance data; Project
photographic documentation; record documents; and other such documents required by
the Contract Documents. Submittals are not Contract Documents. Change Proposals,
Change Orders, Claims, notices, Applications for Payment, and requests for interpretation
or clarification are not Submittals.
45. Substantial Completion—The stage at which the Work (or a specified part thereof) has
progressed to the point where, in the opinion of Owner, the Work (or a specified part
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 4 of 69
Page 20 of 214
thereof) is sufficiently complete in accordance with the Contract Documents, so that the
Work (or a specified part thereof) can be fully utilized for the purposes for which it is
intended. The terms “substantially complete” and “substantially completed” as applied
to all or part of the Work refer to Substantial Completion of such Work. In addition to the
foregoing, the Work shall not be considered to have achieved Substantial Completion
until all of the following conditions have been met:
a. All traffic lanes included as part of the Work, including shoulders and ramps, are in
their final alignment, and the final wearing surface and all sidewalks, curbs, drainage
features, markings, permanent safety appurtenances, lighting, traffic signals, and
signing as shown in the Contract Documents have been installed.
b. All public utilities and private utility services included as part of the Work have been
appropriately installed and successfully passed all required testing.
c. All final grading included as part of the Work is complete, and the Site has been 100%
stabilized with permanent and temporary erosion and sediment control features.
d. The value of all remaining Work is less than 2.5% of the Contract Price, and the
remaining Work will not affect the safety or operations of any infrastructure or
roadway, and will not significantly impact the public.
46. Successful Bidder—The Bidder to which the Owner makes an award of contract.
47. Supplementary Conditions—Any part of the Specifications that purports to amend or
supplement these General Conditions. These General Conditions shall take precedence
and control over any such Supplementary Conditions, except with respect to any written
requirements for materials, equipment, systems, standards, and workmanship as applied
to the Work.
48. Supplier—A manufacturer, fabricator, supplier, distributor, or vendor having a direct
contract with Contractor or with any Subcontractor to furnish materials or equipment to
be incorporated in the Work by Contractor or a Subcontractor.
49. Technical Data
a. Those items expressly identified as Technical Data in the Agreement (or the applicable
Work Order), with respect to (1) existing subsurface conditions at or adjacent to the
Site, or existing physical conditions at or adjacent to the Site, including existing
surface or subsurface structures (except Underground Facilities), and (2) Hazardous
Environmental Conditions.
b. Data contained in boring logs, recorded measurements of subsurface water levels,
assessments of the condition of subsurface facilities, laboratory test results, and
other factual, objective information regarding conditions at the Site that are set forth
in any geotechnical, environmental, or other Site or facilities conditions reports
regarding the Site that are identified in the Contract Documents or otherwise made
available to Contractor.
c. Information and data regarding the presence or location of Underground Facilities
are not intended to be categorized, identified, or defined as Technical Data, and
instead Underground Facilities are shown or indicated on the Drawings.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 5 of 69
Page 21 of 214
50. Underground Facilities—All active or not-in-service underground lines, pipelines,
conduits, ducts, encasements, cables, wires, manholes, vaults, tanks, tunnels, or other
such facilities or systems at the Site, including but not limited to those facilities or systems
that produce, transmit, distribute, or convey telephone or other communications, cable
television, fiber optic transmissions, power, electricity, light, heat, gases, oil, crude oil
products, liquid petroleum products, water, steam, waste, wastewater, storm water,
other liquids or chemicals, or traffic or other control systems. An abandoned facility or
system is not an Underground Facility.
51. Unit Price Work—Work to be paid for on the basis of unit prices.
52. Work—The entire construction, including the various separately identifiable parts
thereof, required to be provided under the Contract Documents. Work includes and is the
result of, without limitation, performing or providing all labor, services, and
documentation necessary to produce such construction; furnishing, installing, and
incorporating all materials and equipment into such construction; and might include,
without limitation, related services such as testing, start-up, and commissioning, all as
required by the Contract Documents.
53. Work Change Directive—A written directive to Contractor issued on or after the Effective
Date of the Contract, signed by Owner, ordering an addition, deletion, or revision in the
Work.
54. Work Order—A document issued by Owner to Contractor under the Agreement
authorizing certain Work to be performed on the Project, and indicating the quantities of
Work to be performed, the location(s) where the Work is to be performed, time limits
within which the Work is to be performed, and other details pertinent to the applicable
portion of the Work.
1 .02 Terminology
A. The words and terms discussed in Paragraphs 1.02.B, C, D, and E are not defined terms that
require initial capital letters, but, when used in the Bidding Requirements or Contract
Documents, have the indicated meaning.
B. Intent of Certain Terms
1. The Contract Documents include the terms “as allowed,” “as approved,” “as ordered,”
“as directed” or terms of like effect or import to authorize an exercise of judgment by
Owner. In addition, the adjectives “reasonable,” “suitable,” “acceptable,” “proper,”
“satisfactory,” or adjectives of like effect or import are used to describe an action or
determination of Owner as to the Work. It is intended that such exercise of judgment,
action, or determination shall be solely to evaluate, in general, the Work for compliance
with the information in the Contract Documents and with the design concept of the
Project as a functioning whole as shown or indicated in the Contract Documents (unless
there is a specific statement indicating otherwise). The use of any such term or adjective
is not intended to and shall not be effective to assign to Owner any duty or authority to
supervise or direct the performance of the Work, or any duty or authority to undertake
responsibility contrary to the provisions of Article 10 or any other provision of the
Contract Documents.
2. The Contract Documents frequently omit modifying words such as “all” and “any,” and
articles such as “the” and “an,” but the fact that a modifier or an article is absent from
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 6 of 69
Page 22 of 214
one statement and appears in another is not intended to affect the interpretation of
either statement. When used in the Contract Documents, unless the context clearly
dictates otherwise, (1) the singular shall include the plural, and vice versa, (2) the use of
the masculine, feminine or neuter gender shall include all other genders, as appropriate,
and (3) the disjunctive “or” shall include the conjunctive “and,” and vice versa.
C. Day: Except as otherwise specifically stated, the word “day” means a calendar day of 24 hours
measured from midnight to the next midnight.
D. Defective: The word “defective,” when modifying the word “Work,” refers to Work that is
unsatisfactory, faulty, or deficient in that it:
1. does not conform to the Contract Documents;
2. does not meet the requirements of any applicable inspection, reference standard, test,
or approval referred to in the Contract Documents; or
3. has been damaged prior to final payment
E. Furnish, Install, Perform, Provide
1. The word “furnish,” when used in connection with services, materials, or equipment,
means to supply and deliver said services, materials, or equipment to the Site (or some
other specified location approved by Owner) ready for use or installation and in usable or
operable condition.
2. The word “install,” when used in connection with services, materials, or equipment,
means to put into use or place in final position said services, materials, or equipment
complete and ready for intended use.
3. The words “perform” or “provide,” when used in connection with services, materials, or
equipment, mean to furnish and install said services, materials, or equipment complete
and ready for intended use.
4. If the Contract Documents establish an obligation of Contractor with respect to specific
services, materials, or equipment, but do not expressly use any of the four words
“furnish,” “install,” “perform,” or “provide,” then Contractor shall furnish and install said
services, materials, or equipment complete and ready for intended use.
F. Contract Price or Contract Times: References to a change in “Contract Price or Contract Times”
or “Contract Times or Contract Price” or similar, indicate that such change applies to
(1) Contract Price, (2) Contract Times, or (3) both Contract Price and Contract Times, each as
reasonably determined by Owner, even if the term “or both” is not expressed.
G. Set-Off: As used in the Contract Documents, Owner’s right to impose a “set-off” also includes,
without limitation, Owner’s right to payment and recovery of the pertinent amount from
Contractor.
H. Unless stated otherwise in the Contract Documents, words or phrases that have a well-known
technical or construction industry or trade meaning are used in the Contract Documents in
accordance with such recognized meaning.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 7 of 69
Page 23 of 214
ARTICLE 2—PRELIMINARY MATTERS
2 .01 Delivery of Performance and Payment Bonds; Evidence of Insurance
A. Performance and Payment Bonds: When Contractor delivers the signed counterparts of the
Agreement to Owner, Contractor shall also deliver to Owner the performance bond and
payment bond (if the Contract requires Contractor to furnish such bonds).
B. Evidence of Contractor’s Insurance: When Contractor delivers the signed counterparts of the
Agreement to Owner, Contractor shall also deliver to Owner, with copies to each additional
insured (as identified in the Contract), the policies, certificates, endorsements, and other
evidence of insurance required to be provided by Contractor in accordance with Article 6.
2.02 Copies of Documents
A. Owner shall furnish to Contractor one fully signed counterpart of the Agreement, and one
copy in electronic portable document format (PDF).
B. Owner shall maintain and safeguard at least one original printed version of the Contract,
including Drawings and Specifications signed and sealed by Engineer and other design
professionals. Owner shall make such original printed version of the Contract available to
Contractor for review.
2.03 Before Starting Construction
A. Preliminary Schedules: Within 10 days after the Effective Date of the Contract (or as otherwise
required by the Contract Documents), Contractor shall submit to Owner for timely review a
preliminary schedule including:
1. The planned start and completion dates for each activity, the duration of each activity,
and the sequencing of all activities. If activities have durations of more than one updated
period, break the activities into two or more activities distinguished by location or some
other feature.
2. Dates related to the procurement of materials, equipment and articles of special
manufacture; and dates related to the submission of working drawings, plans and other
data specified for review or approval by Owner.
3. Dates related to key Owner inspections.
4. Dates related to specified activities by the Owner and third parties, and times for starting
and completing the various stages of Work, including but not limited to all Milestones
specified in the Contract.
5. A preliminary Schedule of Submittals.
6. A preliminary Schedule of Values for all of the Work, which includes quantities and prices
of items that, when added together, equal the Contract Price, and which subdivides the
Work into component parts in sufficient detail to serve as the basis for progress payments
during performance of the Work. Such prices shall include an appropriate amount of
overhead and profit applicable to each item of Work.
2.04 Preconstruction Conference; Designated Representatives
A. Before any Work at the Site is started, a conference attended by Owner, Contractor, Engineer,
and others as appropriate shall be held to establish a working understanding among the
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 8 of 69
Page 24 of 214
parties as to the Work, and to discuss the schedules referred to in Paragraph 2.03.A,
procedures for handling Shop Drawings, Samples, and other Submittals, processing
Applications for Payment, electronic or digital transmittals, and maintaining required records.
B. Owner’s and Contractor’s Designated Representatives are those individuals identified as such
in the Agreement (or the applicable Work Order). Subject to Paragraph 9.01 with respect to
Owner, each party’s Designated Representative is authorized to act as its authorized
representative with respect to the services and responsibilities under the Contract. Subject to
Paragraph 9.01 with respect to Owner, such individuals shall have the authority to transmit
and receive information, render decisions relative to the Contract, and otherwise act on
behalf of each respective party.
2.05 Acceptance of Schedules
A. At least 10 days before submission of the first Application for Payment, a conference,
attended by Owner, Contractor, Engineer, and others as appropriate, shall be held to review
the schedules submitted in accordance with Paragraph 2.03.A. No progress payment shall be
made to Contractor until acceptable schedules are submitted to Owner in accordance with
the following:
1. The Progress Schedule shall provide for an orderly progression of the Work to completion
within the Contract Times.
2. Contractor’s Schedule of Submittals shall provide a workable arrangement for reviewing
and processing the required Submittals.
3. Contractor’s Schedule of Values shall provide for a reasonable allocation of the Contract
Price to the component parts of the Work.
4. If a schedule is not acceptable to Owner, Contractor shall have an additional 10 days to
revise and resubmit the schedule. Acceptance of a schedule by Owner shall not impose
on Owner responsibility for sequencing, scheduling, or progress of the Work, and shall
not relieve Contractor from Contractor’s full responsibility therefor.
2 .06 Electronic Transmittals
A. Except as otherwise stated elsewhere in the Contract, the Owner, Engineer, and Contractor
may send, and shall accept, Electronic Documents transmitted by Electronic Means.
B. If the Contract does not establish protocols for Electronic Means, then Owner, Engineer, and
Contractor shall jointly develop such protocols.
C. Subject to any governing protocols for Electronic Means, when transmitting Electronic
Documents by Electronic Means, the transmitting party makes no representations as to long
term compatibility, usability, or readability of the Electronic Documents resulting from the
recipient’s use of software application packages, operating systems, or computer hardware
differing from those used in the drafting or transmittal of the Electronic Documents.
D. Notwithstanding anything in this Paragraph 2.06, all notices shall be sent as set forth in
Paragraph 18.01.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 9 of 69
Page 25 of 214
ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE
3 .01 Intent
A. The Contract Documents are complementary; what is required by one Contract Document is
as binding as if required by all.
B. It is the intent of the Contract Documents to describe and require a functionally complete
Project to be constructed in accordance with the Contract Documents.
C. Unless otherwise stated in the Contract Documents, if there is a discrepancy between the
electronic versions of the Contract Documents (including any printed copies derived from
such electronic versions) and the printed record version, the printed record version shall
govern.
D. The Contract supersedes prior negotiations, representations, and agreements, whether
written or oral.
E. Owner or Engineer shall issue clarifications and interpretations of the Contract Documents as
provided herein.
F. Any provision or part of the Contract Documents held to be void or unenforceable under any
Law or Regulation shall be deemed stricken, and all remaining provisions shall continue to be
valid and binding upon Owner and Contractor, which agree that the Contract Documents shall
be reformed to replace such stricken provision or part thereof with a valid and enforceable
provision that comes as close as possible to expressing the intention of the stricken provision.
G. Nothing in the Contract Documents creates:
1. any rights or claims against Owner or any other Owner Parties in favor of Engineer, any
Subcontractor, Supplier, or other individual or entity performing or furnishing any of the
Work, or any other individual or entity not a party to the Contract; or
2. any obligation on the part of Owner or Engineer to pay or to see to the payment of any
money due any such Subcontractor, Supplier, or other individual or entity, except as
otherwise required by Laws and Regulations.
3.02 Reference Standards
A. Standards Specifications, Codes, Laws and Regulations
1. Reference in the Contract Documents to standard specifications, manuals, reference
standards, or codes of any technical society, organization, or association, or to Laws or
Regulations, whether such reference be specific or by implication, means the standard
specification, manual, reference standard, code, or Laws or Regulations in effect at the
time of opening of Bids (or on the Effective Date of the Contract if there were no Bids),
except as otherwise specifically stated in the Contract Documents.
2. No such provision or instruction shall be effective to assign to Owner or Engineer any duty
or authority to supervise or direct the performance of the Work, or any duty or authority
to undertake responsibility inconsistent with the Contract Documents.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 10 of 69
Page 26 of 214
3.03 Reporting and Resolving Discrepancies
A. Reporting Discrepancies
1. Contractor’s Verification of Figures and Field Measurements: Before undertaking each
part of the Work, Contractor shall examine and carefully study the Contract Documents,
and check and verify pertinent figures and dimensions therein, particularly with respect
to applicable field measurements. Contractor shall promptly report in writing to Owner
any conflict, error, ambiguity, or discrepancy that Contractor discovers, or has actual
knowledge of, and shall not proceed with any Work affected thereby until the conflict,
error, ambiguity, or discrepancy is resolved by a clarification or interpretation from
Owner, or by an amendment or supplement to the Contract issued pursuant to
Paragraph 11.01.
2. Contractor’s Review of Contract Documents: If, before or during the performance of the
Work, Contractor discovers any conflict, error, ambiguity, or discrepancy within the
Contract Documents, or between the Contract Documents and (a) any applicable Law or
Regulation, (b) actual field conditions, (c) any standard specification, manual, reference
standard, or code, or (d) any instruction of any Supplier, then Contractor shall promptly
report it to Owner in writing. Contractor shall not proceed with the Work affected thereby
(except in an emergency as required by Paragraph 7.15) until the conflict, error,
ambiguity, or discrepancy is resolved, by a clarification or interpretation from Owner, or
by an amendment or supplement to the Contract issued pursuant to Paragraph 11.01.
3. Contractor shall not be liable to Owner or Engineer for failure to report any conflict, error,
ambiguity, or discrepancy in the Contract Documents unless Contractor had actual
knowledge thereof.
B. Resolving Discrepancies
1. Except as otherwise specifically stated in the Contract Documents, the provisions of the
part of the Contract Documents prepared by or for Engineer take precedence in resolving
any conflict, error, ambiguity, or discrepancy between such provisions of the Contract
Documents and:
a. the provisions of any standard specification, manual, reference standard, or code, or
the instruction of any Supplier (whether or not specifically incorporated by reference
as a Contract Document); or
b. the provisions of any Laws or Regulations applicable to the performance of the Work
(unless such an interpretation of the provisions of the Contract Documents would
result in violation of such Law or Regulation).
3.04 Requirements of the Contract Documents
A. During the performance of the Work and until Final Completion, Contractor shall submit to
Owner in writing all matters in question concerning the requirements of the Contract
Documents (sometimes referred to as requests for information or interpretation—RFIs), or
relating to the acceptability of the Work under the Contract Documents, as soon as possible
after such matters arise. Owner shall be the initial interpreter of the requirements of the
Contract Documents, and judge of the acceptability of the Work.
B. Owner shall, with reasonable promptness, render or cause to be rendered a written
clarification, interpretation, or decision on the issue submitted, or initiate an amendment or
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 11 of 69
Page 27 of 214
supplement to the Contract Documents. Such written clarification, interpretation, or decision
shall be final and binding on Contractor, unless it appeals by submitting a Change Proposal.
C. If a submitted matter in question concerns the Contract Documents and Owner and
Contractor are unable to agree on resolution of such a matter in question, either party may
pursue resolution as provided in Article 12.
3 .05 Reuse of Documents
A. Contractor and its Subcontractors and Suppliers shall not:
1. have or acquire any title to or ownership rights in any of the Drawings, Specifications, or
other documents (or copies of any thereof) prepared by or bearing the seal of Engineer
or its consultants, including but not limited to electronic media versions, or reuse any
such Drawings, Specifications, other documents, or copies thereof on extensions of the
Project or any other project without written consent of Owner and Engineer and specific
written verification or adaptation by Engineer; or
2. have or acquire any title or ownership rights in any other Contract Documents, reuse any
such Contract Documents for any purpose without Owner’s express written consent, or
violate any copyrights pertaining to such Contract Documents.
B. The prohibitions of this Paragraph 3.05 shall survive Final Completion or earlier termination
of the Contract. Nothing herein precludes Contractor from retaining copies of the Contract
Documents for record purposes.
ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK
4 .01 Commencement of Contract Times; Work Order
A. Unless the Contract states otherwise, the Contract Times shall commence to run on the day
indicated in the Work Order. A Work Order may be given at any time within 60 days after the
Effective Date of the Contract. In no event shall the Contract Times commence to run later
than the actual commencement of the Work on the Project.
4.02 Starting the Work
A. Unless the Contract states otherwise, Contractor shall start to perform the Work on the date
indicated in the Work Order. No Work may be done at the Site prior to such date.
4 .03 Reference Points
A. Owner shall provide engineering surveys to establish reference points for construction if
reasonably necessary to enable Contractor to proceed with the Work. Contractor shall be
responsible for laying out the Work, shall protect and preserve the established reference
points and property monuments, and shall make no changes or relocations without the prior
written approval of Owner. Contractor shall report to Owner whenever any reference point
or property monument is lost or destroyed or requires relocation because of necessary
changes in grades or locations, and shall be responsible for the accurate replacement or
relocation of such reference points or property monuments by professionally qualified
personnel.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 12 of 69
Page 28 of 214
4 .04 Progress Schedule
A. Contractor shall adhere to the Progress Schedule established in accordance with
Paragraph 2.05 as it is adjusted from time to time as follows:
1. Contractor shall submit to Owner for acceptance (to the extent indicated in
Paragraph 2.05) proposed adjustments in the Progress Schedule that will not result in
changing the Contract Times.
2. Proposed adjustments in the Progress Schedule that will change the Contract Times shall
be submitted in accordance with the requirements of Article 11.
B. Contractor shall carry on the Work and adhere to the Progress Schedule during all disputes or
disagreements with Owner. No Work shall be delayed or postponed pending resolution of any
disputes or disagreements, or during any appeal process, except as permitted by
Paragraph 16.04, or as Owner and Contractor otherwise agree in writing.
4 .05 Delays in Contractor’s Progress
A. If Owner, Engineer, or anyone for whom Owner is responsible unreasonably delays, disrupts,
or interferes with Contractor’s performance or progress of the Work associated with the
Critical Path, as shown on the Contractor’s then-current Progress Schedule, then Contractor
shall be entitled to an adjustment in the Contract Price or Contract Times, but only to the
extent the delay, disruption, or interference affects Contractor’s cost of, or time required for,
performance of the Work, as reasonably determined by Owner. Contractor shall not be
entitled to an adjustment in Contract Price for any delay, disruption, or interference if such
delay is concurrent with a delay, disruption, or interference caused by or within the control
of any of the Contractor Parties. Such a concurrent delay by Contractor shall not preclude an
adjustment of Contract Times to which Contractor is otherwise entitled under the Contract,
to the extent such concurrent delay is not caused by any of the Contractor Parties.
B. In any event, Contractor shall not be entitled to an adjustment in Contract Price or Contract
Times for delay, disruption, or interference caused by or within the control of any of the
Contractor Parties.
C. If Contractor’s performance or progress is delayed, disrupted, or interfered with by
unanticipated causes not the fault of and beyond the control of Owner, Contractor, and those
for which they are responsible, then Contractor shall be entitled to an adjustment in Contract
Times, but only to the extent the delay, disruption, or interference affects Contractor’s cost
of, or time required for, performance of the Work, as reasonably determined by Owner.
Causes of delay, disruption, or interference that might give rise to an adjustment in Contract
Times under this paragraph include the following:
1. Severe and unavoidable natural catastrophes such as fires, floods, epidemics, and
earthquakes;
2. Abnormal weather conditions;
3. Acts or failures to act of third-party utility owners or other third-party entities (other than
those third-party utility owners or other third-party entities performing other work at or
adjacent to the Site as arranged by or under contract with Owner, as contemplated in
Article 8); and
4. Acts of war or terrorism.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 13 of 69
Page 29 of 214
5. Weather-Related Delays
a. If “abnormal weather conditions” as set forth in Paragraph 4.05.C.2 are the basis for
a request for an adjustment in the Contract Times, such request shall be governed by
the Supplementary Conditions.
D. Contractor’s entitlement to an adjustment of Contract Times or, if applicable, Contract Price,
is limited as follows:
1. Contractor’s entitlement to an adjustment of the Contract Times is conditioned on the
delay, disruption, or interference adversely affecting an activity on the Critical Path, as of
the time of the delay, disruption, or interference.
2. Adjustments of Contract Times or Contract Price are subject to the provisions of
Article 11.
E. Each Contractor request or Change Proposal seeking an increase in Contract Times or, if
applicable, Contract Price shall be supplemented by supporting data that sets forth in detail
the following:
1. The circumstances that form the basis for the requested adjustment;
2. The date upon which each cause of delay, disruption, or interference began to affect the
progress of the Work;
3. The number of days’ increase in Contract Times claimed as a consequence of each such
cause of delay, disruption, or interference; and
4. The impact on Contract Price, in accordance with the provisions of Paragraph 11.07.
Contractor shall also furnish such additional supporting documentation as Owner requires,
including but not limited to where appropriate, a revised progress schedule indicating all the
activities affected by the delay, disruption, or interference, and an explanation of the effect
of the delay, disruption, or interference on the Critical Path.
F. Delays, disruption, and interference to the performance or progress of the Work resulting
from the existence of a differing subsurface or physical condition, an Underground Facility
that was not shown or indicated by the Contract Documents, or one not shown or indicated
with reasonable accuracy, and those resulting from Hazardous Environmental Conditions, are
governed by Article 5, together with the provisions of Paragraphs 4.05.D and 4.05.E.
G. Paragraph 8.03 addresses delays, disruption, and interference to the performance or progress
of the Work resulting from the performance of certain other work at or adjacent to the Site.
H. Except as specifically set forth in the Contract, an adjustment of the Contract Times shall be
Contractor’s sole and exclusive remedy for any delay, disruption, interference, hindrance or
obstruction in Contractor’s commencement, performance or completion of the Work, loss of
productivity, or other similar claims (collectively “Delays”), whether or not such Delays are
foreseeable. In no event shall Contractor be entitled to any compensation or recovery of any
damages in connection with any Delays, including but not limited to actual damages,
consequential damages, lost opportunity costs, impact damages, extended general
conditions, or other similar costs or damages. Owner’s exercise of any of its rights or remedies
under the Contract, including but not limited to ordering changes in the Work, directing
suspension of the Work, rescheduling, correction of the Work, or terminating the Contract for
convenience, regardless of the extent or frequency of such exercise, shall not be construed as
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 14 of 69
Page 30 of 214
a delay, disruption, or interference with Contractor’s performance or progress of the Work
under Paragraph 4.05.A.
ARTICLE 5—SITE; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL
CONDITIONS
5 .01 Availability of Lands
A. Owner shall furnish the Site. Owner shall notify Contractor in writing of any known
encumbrances or restrictions not of general application but specifically related to use of the
Site with which Contractor shall comply in performing the Work.
B. Upon reasonable written request, Owner shall furnish Contractor with a current statement of
record legal title and legal description of the lands upon which permanent improvements are
to be made and Owner’s interest therein.
C. If necessary for timely and proper performance of the Work, Contractor shall arrange for use
of and access to all additional lands required for temporary construction facilities and storage
of materials and equipment.
5 .02 Use of Site and Other Areas
A. Limitation on Use of Site and Other Areas
1. Contractor shall confine construction equipment, temporary construction facilities, the
storage of materials and equipment, and the operations of workers to the Site, adjacent
areas that Contractor has arranged to use or access through construction easements or
otherwise, and other adjacent areas permitted by Laws and Regulations, and shall not
unreasonably encumber the Site and such other adjacent areas with construction
equipment or other materials or equipment. Contractor shall assume full responsibility
for (a) damage to the Site; (b) damage to any areas used for Contractor’s operations; (c)
damage to any other land or areas, or to improvements, structures, utilities, or similar
facilities; and (d) for injuries and losses sustained by the owners or occupants of any such
land or areas; provided that such damage or injuries result from the performance of the
Work or from other actions or conduct of any of the Contractor Parties.
2. If a damage or injury claim is made by the owner or occupant of any such land or area
because of the performance of the Work, or because of other actions or conduct of any
of the Contractor Parties, Contractor shall (a) take immediate corrective or remedial
action as required by Paragraph 7.13, or otherwise; (b) promptly attempt to settle the
claim as to all parties through negotiations with such owner or occupant, or otherwise
resolve the claim by arbitration or other dispute resolution proceeding, or in a court of
competent jurisdiction; and (c) to the full extent permitted by Laws and Regulations,
defend (at Owner’s option in its sole discretion), indemnify and hold harmless the Owner
Parties and Engineer, and the consultants and subcontractors of each and any of them,
from and against all such claims, and against all costs, losses, and damages (including but
not limited to all fees and charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute resolution costs) arising out of
or relating to any claim or action, legal or equitable, brought by any such owner or
occupant against any of the Owner Parties, Engineer, or any other party indemnified
hereunder to the extent caused directly or indirectly, in whole or in part by, or based
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 15 of 69
Page 31 of 214
upon, performance of the Work, or because of other actions or conduct of any of the
Contractor Parties.
B. Removal of Debris During Performance of the Work: During the progress of the Work the
Contractor shall keep the Site and other adjacent areas free from accumulations of waste
materials, rubbish, and other debris. Removal and disposal of such waste materials, rubbish,
and other debris shall conform to applicable Laws and Regulations.
C. Cleaning: Prior to Substantial Completion of the Work Contractor shall clean the Site and the
Work and make it ready for utilization by Owner. Upon completion of the Work at the Site,
Contractor shall remove from the Site and adjacent areas all tools, appliances, construction
equipment and machinery, and surplus materials and shall restore to original condition all
property not designated for alteration by the Contract Documents.
D. Loading of Structures: Contractor shall not load nor permit any part of any structure to be
loaded in any manner that will endanger the structure, its contents or any person, nor shall
Contractor subject any part of the Work or adjacent structures or land to stresses or pressures
that will endanger them or any contents or persons.
5 .03 Subsurface and Physical Conditions
A. Underground Facilities: Information and data regarding the presence or location of
Underground Facilities are not intended to be categorized, identified, or defined as Technical
Data.
B. Reliance by Contractor on Technical Data: Contractor may reasonably rely upon the accuracy
of Technical Data.
C. Limitations of Other Data and Documents: Except for such reliance on Technical Data,
Contractor may not rely upon or make any claim against any of the Owner Parties or Engineer,
or any of their consultants or contractors, with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes, including but
not limited to any aspects of the means, methods, techniques, sequences, and procedures
of construction to be employed by Contractor, and safety precautions and programs
incident thereto;
2. other data, interpretations, opinions, and information contained in such reports or shown
or indicated in such drawings;
3. the contents of other Site-related documents made available to Contractor, such as
record drawings from other projects at or adjacent to the Site, or Owner’s archival
documents concerning the Site; or
4. any Contractor interpretation of or conclusion drawn from any Technical Data or any such
other data, interpretations, opinions, or information.
5 .04 Differing Subsurface or Physical Conditions
A. Notice by Contractor: If Contractor believes that any subsurface or physical condition that is
uncovered or revealed at the Site:
1. is of such a nature as to establish that any Technical Data on which Contractor is entitled
to reasonably rely as provided in Paragraph 5.03 is materially inaccurate;
2. is of such a nature as to require a change in the Drawings or Specifications;
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 16 of 69
Page 32 of 214
3. differs materially from that shown or indicated in the Contract Documents; or
4. is of an unusual nature, and differs materially from conditions ordinarily encountered and
generally recognized as inherent in work of the character provided for in the Contract
Documents;
then Contractor shall, promptly after becoming aware thereof and before further disturbing
the subsurface or physical conditions or performing any Work in connection therewith (except
in an emergency as required by Paragraph 7.15), notify Owner in writing about such condition.
Contractor shall not further disturb such condition or perform any Work in connection
therewith (except with respect to an emergency) until the Owner has a reasonable
opportunity to review the subsurface or physical condition in question.
B. Owner’s Review: After receipt of written notice as required by the preceding paragraph,
Owner shall promptly review the subsurface or physical condition in question; determine
whether it is necessary to obtain additional exploration or tests with respect to the condition;
conclude whether the condition falls within any one or more of the differing site condition
categories in Paragraph 5.04.A; and obtain any pertinent cost or schedule information from
Contractor.
C. Owner’s Statement to Contractor Regarding Site Condition: Owner shall issue a written
statement to Contractor regarding the subsurface or physical condition in question,
addressing the resumption of Work in connection with such condition, and indicating whether
any change in the Drawings or Specifications will be made.
D. Early Resumption of Work: If at any time Owner determines that Work in connection with the
subsurface or physical condition in question may resume prior to completion of Owner’s
review or issuance of its statement to Contractor, because the condition in question has been
adequately documented, and analyzed on a preliminary basis, then Owner may at its
discretion instruct Contractor to resume such Work.
E. Possible Price and Times Adjustments
1. Contractor shall be entitled to an adjustment in Contract Times, and might be entitled to
an adjustment in Contract Price (excluding any overhead or profit), each as reasonably
determined by Owner, to the extent that the existence of a differing subsurface or
physical condition, or any related delay, disruption, or interference, causes an increase or
decrease in Contractor’s cost of, or time required for, performance of the Work; subject,
however, to the following:
a. Such condition falls within one or more of the categories described in
Paragraph 5.04.A;
b. With respect to Work that is paid for on a unit price basis, any adjustment in Contract
Price shall be subject to the provisions of Paragraph 13.03; and,
c. Contractor’s entitlement to an adjustment of the Contract Times is subject to the
provisions of Paragraphs 4.05.D and 4.05.E.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 17 of 69
Page 33 of 214
2. Contractor shall not be entitled to any adjustment in the Contract Price or Contract Times
with respect to a subsurface or physical condition if:
a. Contractor knew of the existence of such condition at the time Contractor made a
commitment to Owner with respect to Contract Price and Contract Times by the
submission of a Bid, or otherwise;
b. The existence of such condition reasonably could have been discovered or revealed
as a result of any examination, investigation, exploration, test, or study of the Site and
contiguous areas expressly required by the Bidding Requirements or Contract
Documents to be conducted by or for Contractor; or
c. Contractor failed to give the written notice required by Paragraph 5.04.A.
3. If Owner and Contractor agree regarding Contractor’s entitlement to and the amount or
extent of any adjustment in the Contract Price or Contract Times, then any such
adjustment shall be set forth in a Change Order.
4. Contractor may submit a Change Proposal regarding its entitlement to or the amount or
extent of any adjustment in the Contract Price or Contract Times no later than 14 days
after Owner’s issuance of the Owner’s written statement to Contractor regarding the
subsurface or physical condition in question.
F. Human Remains; Artifacts. If, in the course of the Work, Contractor encounters or recognizes
the existence of human remains, burial markers, archaeological sites, historic sites or artifacts,
or wetlands not indicated in the Contract Documents, Contractor shall immediately suspend
any operations that would affect them and notify Owner. Upon receipt of such notice, Owner
shall promptly take action to obtain any governmental authorization required to resume the
operations. Contractor shall continue to suspend such operations until otherwise instructed
by Owner in writing, but shall continue with all other operations that do not affect those
remains or features. Any requests for adjustments in the Contract Price or Contract Times
arising from the existence of such remains or features shall be governed by the foregoing
provisions of this Paragraph 5.04.
G. Underground Facilities; Hazardous Environmental Conditions: Paragraph 5.05 governs rights
and responsibilities regarding the presence or location of Underground Facilities.
Paragraph 5.06 governs rights and responsibilities regarding Hazardous Environmental
Conditions. The provisions of Paragraphs 5.03 and 5.04 are not applicable to the presence or
location of Underground Facilities or to Hazardous Environmental Conditions.
5.05 Underground Facilities
A. Contractor’s Responsibilities: The cost of all of the following are included in the Contract Price,
and Contractor shall have full responsibility for:
1. reviewing and checking all information and data regarding existing Underground Facilities
at the Site;
2. complying with applicable state and local utility damage prevention Laws and
Regulations;
3. verifying the actual location of those Underground Facilities shown or indicated in the
Contract Documents as being within the area affected by the Work, by exposing such
Underground Facilities during the course of construction;
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 18 of 69
Page 34 of 214
4. coordination of the Work with the owners (including Owner) of such Underground
Facilities, during construction; and
5. the safety and protection of all existing Underground Facilities at the Site, and repairing
any damage thereto resulting from the Work.
B. Notice by Contractor: If Contractor believes that an Underground Facility that is uncovered or
revealed at the Site was not shown or indicated on the Drawings, or was not shown or
indicated on the Drawings with reasonable accuracy, then Contractor shall, promptly after
becoming aware thereof and before further disturbing conditions affected thereby or
performing any Work in connection therewith (except in an emergency as required by
Paragraph 7.15), notify Owner in writing regarding such Underground Facility.
C. Owner’s Review: After receipt of such notice, Owner shall:
1. promptly review the Underground Facility and conclude whether such Underground
Facility was not shown or indicated on the Drawings, or was not shown or indicated with
reasonable accuracy;
2. identify and communicate with the owner of the Underground Facility; and, if necessary,
issue any preliminary instructions to Contractor regarding the Contractor’s resumption of
Work in connection with the Underground Facility in question; and
3. obtain any pertinent schedule information from Contractor; determine the extent, if any,
to which a change is required in the Drawings or Specifications to reflect and document
the consequences of the existence or location of the Underground Facility.
During such time, Contractor shall be responsible for the safety and protection of such
Underground Facility.
D. Owner’s Statement to Contractor Regarding Underground Facility: Owner shall issue a written
statement to Contractor regarding the Underground Facility in question, addressing the
resumption of Work in connection with such Underground Facility, and indicating whether
any change in the Drawings or Specifications will be made.
E. Early Resumption of Work: If at any time Owner determines that Work in connection with the
Underground Facility may resume prior to completion of Owner’s review or issuance of its
statement to Contractor, because the Underground Facility in question and conditions
affected by its presence have been adequately documented, and analyzed on a preliminary
basis, then the Owner may at its discretion instruct Contractor to resume such Work.
F. Possible Time Adjustments
1. Contractor shall be entitled to an adjustment in the Contract Times, but no adjustment in
Contract Price, as reasonably determined by Owner, to the extent any existing
Underground Facility at the Site that was not shown or indicated on the Drawings, or was
not shown or indicated with reasonable accuracy, or any related delay, disruption, or
interference, causes an increase or decrease in Contractor’s time required for
performance of the Work; subject, however, to the following:
a. Contractor’s entitlement to an adjustment of the Contract Times is subject to the
provisions of Paragraphs 4.05.D and 4.05.E; and
b. Contractor gave the notice required in Paragraph 5.05.B.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 19 of 69
Page 35 of 214
2. If Owner and Contractor agree regarding Contractor’s entitlement to and the extent of
any adjustment in the Contract Times, then any such adjustment shall be set forth in a
Change Order.
3. Contractor may submit a Change Proposal regarding its entitlement to or the extent of
any adjustment in the Contract Times, no later than 14 days after Owner’s issuance of the
Owner’s written statement to Contractor regarding the Underground Facility in question.
5 .06 Hazardous Environmental Conditions
A. Reliance by Contractor on Technical Data Authorized: Contractor may reasonably rely upon
the accuracy of the Technical Data. Except for such reliance on Technical Data, Contractor
may not rely upon or make any claim against any of the Owner Parties or Engineer, or any of
their consultants or subcontractors, with respect to:
1. the completeness of such reports and drawings for Contractor’s purposes, including but
not limited to any aspects of the means, methods, techniques, sequences and procedures
of construction to be employed by Contractor, and safety precautions and programs
incident thereto;
2. other data, interpretations, opinions, and information contained in such reports or shown
or indicated in such drawings; or
3. any Contractor interpretation of or conclusion drawn from any Technical Data or any such
other data, interpretations, opinions or information.
B. Contractor shall not be responsible for removing or remediating any Hazardous
Environmental Condition encountered, uncovered, or revealed at the Site unless such
removal or remediation is expressly identified in the Contract Documents to be within the
scope of the Work.
C. Contractor shall be responsible for controlling, containing, and duly removing all Constituents
of Concern brought to the Site by any of the Contractor Parties, and for any associated costs;
and for the costs of removing and remediating any Hazardous Environmental Condition
created by the presence of any such Constituents of Concern.
D. If Contractor encounters, uncovers, or reveals a Hazardous Environmental Condition whose
removal or remediation is not expressly identified in the Contract Documents as being within
the scope of the Work, or if any of the Contractor Parties creates a Hazardous Environmental
Condition, then Contractor shall immediately: (1) secure or otherwise isolate such condition;
(2) stop all Work in connection with such condition and in any area that could reasonably be
affected thereby (except in an emergency as required by Paragraph 7.15); and (3) notify
Owner (and promptly thereafter confirm such notice in writing). Owner shall consider the
necessity to retain a qualified expert to evaluate such condition or take corrective action, if
any. Owner shall take such actions as are necessary to permit Owner to timely obtain required
permits and provide Contractor the written notice required by Paragraph 5.06.F. If any of the
Contractor Parties created the Hazardous Environmental Condition in question, then Owner
may remove and remediate the Hazardous Environmental Condition and impose a set-off
against payments to account for the associated costs.
E. Contractor shall not resume Work in connection with such Hazardous Environmental
Condition or in any affected area until after Owner has obtained all required permits related
thereto, and delivered written notice to Contractor either (1) specifying that such condition
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 20 of 69
Page 36 of 214
and any affected area is or has been rendered safe for the resumption of Work, or (2)
specifying any special conditions under which such Work may be resumed safely.
F. If Owner and Contractor cannot agree as to entitlement to, or on the amount or extent of,
any adjustment in Contract Price or Contract Times as a result of such Work stoppage, such
special conditions under which Work is agreed to be resumed by Contractor, or any costs or
expenses incurred in response to the Hazardous Environmental Condition, then within 14
days after Owner’s written notice regarding the resumption of Work, Contractor may submit
a Change Proposal and Owner, without waiting 14 days, may impose a set-off. Entitlement to
any such adjustment is subject to the provisions of Paragraphs 4.05.D, 4.05.E, 11.07, and
11.08. In any event, Contractor shall not be entitled to increased overhead or profit in
connection with any adjustment of the Contract Price under this Paragraph 5.06.
G. If, after receipt of such written notice, Contractor does not agree to resume such Work based
on a reasonable belief it is unsafe, or does not agree to resume such Work under such special
conditions, then Owner may order the portion of the Work that is in the area affected by such
condition to be deleted from the Work, following the contractual change procedures in
Article 11. Owner may have such deleted portion of the Work performed by Owner’s own
forces or others in accordance with Article 8.
H. To the full extent permitted by Laws and Regulations, Contractor shall defend (at Owner’s
option in its sole discretion), indemnify and hold harmless the Owner Parties and Engineer,
and consultants and subcontractors of each and any of them, from and against all claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to the failure to control, contain, or remove any
Constituents of Concern brought to the Site by any of the Contractor Parties, to a Hazardous
Environmental Condition created by any of the Contractor Parties, or failure by any of the
Contractor Parties to fulfill a specific responsibility under the Contract with respect to a
Hazardous Environmental Condition or any other environmental matters. Nothing in this
Paragraph 5.06.I obligates Contractor to defend or indemnify any individual or entity from
and against the consequences of that individual’s or entity’s own negligence.
ARTICLE 6—BONDS AND INSURANCE
6 .01 Performance, Payment, and Other Bonds
A. Contractor shall furnish a performance bond and a payment bond, each in an amount at least
equal to the Contract Price, as security for the faithful performance and payment of
Contractor’s obligations under the Contract. These bonds shall remain in effect until at least
one year after Final Completion or until completion of the correction period specified in
Paragraph 15.06, whichever is later, except as provided otherwise by Laws or Regulations, the
terms of a prescribed bond form, or other provisions of the Contract.
B. Contractor shall also furnish such other bonds (if any) as are required by other provisions of
the Contract.
C. All bonds shall be in the form included in the Bidding Documents or otherwise specified by
Owner prior to signing the Contract, except as provided otherwise by Laws or Regulations,
and shall be issued and signed by a surety named in “Companies Holding Certificates of
Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies”
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 21 of 69
Page 37 of 214
as published in Department Circular 570 (as amended and supplemented) by the Bureau of
the Fiscal Service, U.S. Department of the Treasury. A bond signed by an agent or attorney
in-fact shall be accompanied by a certified copy of that individual’s authority to bind the
surety. The evidence of authority shall show that it is effective on the date the agent or
attorney-in-fact signed the accompanying bond.
D. Contractor shall obtain the required bonds from surety companies that are duly licensed or
authorized, in the state or jurisdiction in which the Project is located, to issue bonds in the
required amounts.
E. If the surety on a bond furnished by Contractor is declared bankrupt or becomes insolvent, or
the surety ceases to meet the requirements of this Paragraph 6.01, then Contractor shall
promptly notify Owner in writing and shall, within 20 days after the event giving rise to such
notification, provide another bond and surety, both of which shall comply with the bond and
surety requirements in this Paragraph 6.01.
F. If Contractor has failed to obtain a required bond, Owner may exclude the Contractor from
the Site and exercise Owner’s termination rights under Article 16.
G. Upon request to Owner from any Subcontractor, Supplier, or other person or entity claiming
to have performed or furnished labor, services, materials, or equipment used in the
performance of the Work, Owner may provide a copy of the payment bond to such person or
entity.
H. Upon request to Contractor from any Subcontractor, Supplier, or other person or entity
claiming to have performed or furnished labor, services, materials, or equipment used in the
performance of the Work, Contractor shall provide a copy of the payment bond to such
person or entity.
6.02 Insurance—General Provisions
A. Owner and Contractor shall obtain and maintain insurance required of each of them,
respectively, in this article and elsewhere in the Contract.
B. All insurance required by the Contract to be purchased and maintained by Owner or
Contractor shall be obtained from and maintained with insurance companies that are duly
licensed or authorized in the state or jurisdiction in which the Project is located to issue
insurance policies for the required limits and coverages. All companies that provide insurance
policies required under this Contract shall have an A.M. Best rating of A-VII or better.
C. Alternative forms of insurance coverage, including but not limited to self-insurance and
“Occupational Accident and Excess Employer’s Indemnity Policies,” are not sufficient to meet
the insurance requirements of this Contract.
D. Contractor shall deliver to Owner, with copies to each additional insured identified in the
Contract, certificates of insurance and endorsements establishing that Contractor has
obtained and is maintaining the policies and coverages required by the Contract. Upon
request by Owner or any other insured, Contractor shall also furnish other evidence of such
required insurance, including but not limited to copies of policies, documentation of
applicable self-insured retentions (if allowed) and deductibles, full disclosure of all relevant
exclusions, and evidence of insurance required to be purchased and maintained by
Subcontractors or Suppliers. In any documentation furnished under this provision, Contractor,
Subcontractors, and Suppliers may block out (redact) (1) any confidential premium or pricing
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 22 of 69
Page 38 of 214
information and (2) any wording specific to a project or jurisdiction other than that applicable
to this Contract.
E. Owner shall deliver to Contractor, with copies to each additional insured identified in the
Contract, certificates of insurance and endorsements establishing that Owner has obtained
and is maintaining the policies and coverages required of Owner by the Contract (if any). Upon
request by Contractor or any other insured, Owner shall also provide other evidence of such
required insurance (if any), including but not limited to copies of policies, documentation of
applicable self-insured retentions (if allowed) and deductibles, and full disclosure of all
relevant exclusions. In any documentation furnished under this provision, Owner may block
out (redact) (1) any confidential premium or pricing information and (2) any wording specific
to a project or jurisdiction other than that relevant to this Contract.
F. Failure of Owner or Contractor to demand such certificates or other evidence of the other
party’s full compliance with these insurance requirements, or failure of Owner or Contractor
to identify a deficiency in compliance from the evidence provided, shall not be construed as
a waiver of the other party’s obligation to obtain and maintain such insurance.
G. In addition to the liability insurance required to be provided by Contractor, the Owner, at
Owner’s option, may purchase and maintain Owner’s own liability insurance. Owner’s liability
policies, if any, operate separately and independently from policies required to be provided
by Contractor, and Contractor cannot rely upon Owner’s liability policies for any of
Contractor’s obligations to the Owner, Engineer, or third parties.
H. Contractor shall require:
1. Subcontractors to purchase and maintain worker’s compensation, commercial general
liability, and other insurance that is appropriate for their participation in the Project, and
to name as additional insureds the Owner Parties and Engineer (and any other individuals
or entities identified in the Contract as additional insureds on Contractor’s liability
policies) on each Subcontractor’s commercial general liability insurance policy; and
2. Suppliers to purchase and maintain insurance that is appropriate for their participation in
the Project.
I. If either party does not purchase or maintain the insurance required of such party by the
Contract, such party shall notify the other party in writing of such failure to purchase prior to
the start of the Work, or of such failure to maintain prior to any change or lapse in the required
coverage.
J. If Contractor has failed to obtain and maintain required insurance, Contractor’s entitlement
to enter or remain at the Site shall end immediately, and Owner may impose a set-off against
payment for any associated costs (including but not limited to the cost of purchasing
necessary insurance coverage), and exercise Owner’s termination rights under Article 16.
K. Without prejudice to any other right or remedy, if a party has failed to obtain required
insurance, the other party may elect (but is in no way obligated) to obtain equivalent
insurance to protect such other party’s interests at the expense of the party who was required
to provide such coverage, and the Contract Price shall be adjusted accordingly.
L. Owner does not represent that insurance coverage and limits established in this Contract
necessarily will be adequate to protect Contractor or Contractor’s interests. Contractor is
responsible for determining whether such coverage and limits are adequate to protect its
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 23 of 69
Page 39 of 214
interests, and for obtaining and maintaining any additional insurance that Contractor deems
necessary.
M. The insurance and insurance limits required under this Contract shall not be deemed as a
limitation on Contractor’s liability, or that of its Subcontractors or Suppliers, under the
indemnities granted to Owner and other individuals and entities in the Contract, or otherwise.
N. All the policies of insurance required to be purchased and maintained under this Contract
shall contain a provision or endorsement that the coverage afforded shall not be canceled, or
renewal refused, until at least 10 days prior written notice has been given to the purchasing
policyholder. Within three days after receipt of any such written notice, the purchasing
policyholder shall provide a copy of the notice to each other insured, additional insured, and
the other party to the Contract.
6 .03 Contractor’s Insurance
A. Required Insurance: Contractor shall purchase and maintain commercial general liability,
automobile liability, worker’s compensation and employer’s liability, umbrella or excess
liability, and other insurance pursuant to the specific requirements of the Contract.
B. General Provisions: The policies of insurance required under this Contract shall:
1. include at least the specific coverages required;
2. be written for not less than the limits set forth in the Agreement, or those required by
Laws or Regulations, whichever is greater;
3. remain in effect at least until Final Completion, and longer if expressly required elsewhere
in this Contract, and at all times thereafter when Contractor is correcting, removing, or
replacing defective Work as a warranty or correction obligation, or otherwise, or
returning to the Site to conduct other tasks arising from the Contract;
4. apply with respect to the performance of the Work by any of the Contractor Parties; and
5. include all necessary endorsements to support the stated requirements.
C. Additional Insureds: The Contractor’s commercial general liability, automobile liability,
employer’s liability, umbrella or excess, pollution liability, and unmanned aerial vehicle
liability policies, if required by this Contract, shall:
1. include and list as additional insureds the Owner Parties and Engineer, and any individuals
or entities identified as additional insureds in the Contract;
2. include coverage for the respective officers, directors, members, partners, employees,
and consultants of all such additional insureds;
3. afford primary coverage to these additional insureds for all claims covered thereby
(including, as applicable, those arising from both ongoing and completed operations);
4. not seek contribution from insurance maintained by the additional insured; and
5. as to commercial general liability insurance, apply to additional insureds with respect to
liability caused in whole or in part by Contractor’s acts or omissions, or the acts and
omissions of those working on Contractor’s behalf, in the performance of Contractor’s
operations.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 24 of 69
Page 40 of 214
D. Commercial General Liability—Claims Covered: Contractor shall purchase and maintain
commercial general liability insurance, covering all operations by or on behalf of Contractor,
on an occurrence basis, against claims for:
1. damages because of bodily injury, sickness or disease, or death of any person other than
Contractor’s employees,
2. damages insured by reasonably available personal injury liability coverage, and
3. damages because of injury to or destruction of tangible property wherever located,
including but not limited to loss of use resulting therefrom.
E. Commercial General Liability—Form and Content: Contractor’s commercial liability policy
shall be written on a 1996 (or later) Insurance Services Organization, Inc. (ISO) commercial
general liability form (occurrence form) and include at least the following coverages and
endorsements:
1. Products and completed operations coverage.
a. Such insurance shall be maintained for at least five years after Final Completion.
b. Contractor shall furnish Owner and each other additional insured (as identified in the
Contract) evidence of continuation of such insurance at Final Completion and every
required year thereafter.
2. Blanket contractual liability coverage, including but not limited to coverage of
Contractor’s contractual indemnity obligations in Paragraph 7.18.
3. Severability of interests and no insured-versus-insured or cross-liability exclusions.
4. Underground, explosion, and collapse coverage.
5. Personal injury coverage.
6. Additional insured endorsements that include both ongoing operations and products and
completed operations coverage through ISO Endorsements CG 20 10 10 01 and
CG 20 37 10 01 (together). If Contractor demonstrates to Owner that the specified ISO
endorsements are not commercially available, then Contractor may satisfy this
requirement by providing equivalent endorsements.
F. Commercial General Liability—Excluded Content: The commercial general liability insurance
policy, including its coverages, endorsements, and incorporated provisions, shall not include
any of the following:
1. Any modification of the standard definition of “insured contract” (except to delete the
railroad protective liability exclusion if Contractor is required to indemnify a railroad or
others with respect to Work within 50 feet of railroad property).
2. Any exclusion for water intrusion or water damage.
3. Any provisions resulting in the erosion of insurance limits by defense costs other than
those already incorporated in ISO form CG 00 01.
4. Any exclusion of coverage relating to earth subsidence or movement.
5. Any exclusion for the insured’s vicarious liability, strict liability, or statutory liability (other
than worker’s compensation).
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 25 of 69
Page 41 of 214
6. Any limitation or exclusion based on the nature of Contractor’s work.
7. Any professional liability exclusion broader in effect than the most recent edition of ISO
form CG 22 79.
G. Commercial General Liability—Minimum Policy Limits: Contractor’s commercial general
liability policy shall be written for not less than the limits set forth in the Agreement.
H. Automobile Liability: Contractor shall purchase and maintain automobile liability insurance
for damages because of bodily injury or death of any person or property damage arising out
of the ownership, maintenance, or use of any motor vehicle. The automobile liability policy
shall be written on an occurrence basis, and shall be written for not less than the limits set
forth in the Agreement.
I. Umbrella or Excess Liability: Contractor shall purchase and maintain umbrella or excess
liability insurance written over the underlying employer’s liability, commercial general
liability, and automobile liability insurance described in this Paragraph 6.03. The coverage
afforded shall be at least as broad as that of each and every one of the underlying policies,
and shall be written for not less than the limits set forth in the Agreement.
J. Waiver of Subrogation: Contractor shall obtain a waiver of subrogation endorsement to each
insurance policy required by this Paragraph 6.03 that waives the insurer’s right to subrogate
a claim against any of the Owner Parties. Contractor also shall require each of its
Subcontractors with such insurance policies applicable to the Project to obtain similar
endorsements to those policies in favor of the Owner Parties.
K. Professional Liability Coverage (if applicable): If any provision of the Contract requires any of
the Contractor Parties to provide professional services, including but not limited to any
architectural, engineering, design, construction management, surveying or other professional
service, Contractor shall obtain and require such Contractor Party to obtain Professional
Liability (errors and omissions) coverage applicable to that party’s portion of the Work, with
limits reasonably acceptable to Owner.
6 .04 Builder’s Risk and Other Property Insurance
A. Builder’s Risk: Unless otherwise provided in the Contract, Contractor shall purchase and
maintain builder’s risk insurance upon the Work on a completed value basis, in the amount
of the Work’s full insurable replacement cost (subject to such deductible amounts as provided
in the Contract or required by Laws and Regulations, whichever is less).
B. Property Insurance for Facilities of Owner Where Work Will Occur: Owner is responsible for
obtaining and maintaining property insurance covering each existing structure, building, or
facility in which any part of the Work will occur, or to which any part of the Work will attach
or be adjoined. Such property insurance shall be written on a special perils (all-risk) form, on
a replacement cost basis, providing coverage consistent with that required for the builder’s
risk insurance, and shall be maintained until the Work is complete, as set forth in
Paragraph 15.04.
C. Property Insurance for Substantially Complete Facilities: Promptly after Substantial
Completion, and before actual occupancy or use of the substantially completed Work, Owner
shall obtain property insurance for such substantially completed Work, and maintain such
property insurance at least until the Work is complete, as set forth in Paragraph 15.04. Such
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 26 of 69
Page 42 of 214
property insurance shall be written on a special perils (all-risk) form, on a replacement cost
basis, and provide coverage consistent with that required for the builder’s risk insurance. The
builder’s risk insurance may terminate upon written confirmation of Owner’s procurement of
such property insurance.
D. Insurance of Other Property; Additional Insurance: If the express insurance provisions of the
Contract do not require or address the insurance of a property item or interest, then the entity
or individual owning such property item shall be responsible for insuring it. If Contractor elects
to obtain other special insurance to be included in or supplement the builder’s risk or property
insurance policies provided under this Paragraph 6.04, it may do so at Contractor’s expense.
6.05 Property Losses; Subrogation
A. The builder’s risk insurance policy purchased and maintained in accordance with
Paragraph 6.04 (or an installation floater policy if authorized by the Contract), shall contain
provisions to the effect that in the event of payment of any loss or damage the insurer shall
have no rights of recovery against any insureds thereunder, or against Engineer or its
consultants, or their officers, directors, members, partners, employees, agents, consultants,
or subcontractors.
1. Owner and Contractor waive all rights against each other and the respective officers,
directors, members, partners, employees, agents, consultants, and subcontractors of
each and any of them, for all losses and damages caused by, arising out of, or resulting
from any of the perils, risks, or causes of loss covered by such policies and any other
property insurance applicable to the Work, but only to the extent of insurance proceeds
received for such losses and damages; and, in addition, waive all such rights against
Engineer, its consultants, all individuals or entities identified in the Contract as builder’s
risk or installation floater insureds, and the officers, directors, members, partners,
employees, agents, consultants, and subcontractors of each and any of them, under such
policies for losses and damages so caused, but only to the extent of insurance proceeds
received for such losses and damages.
2. None of the waivers in this Paragraph 6.05 extends to the rights that any party making
such waiver has to the proceeds of insurance held by Owner or Contractor as trustee or
fiduciary, or otherwise payable under any policy so issued.
B. Any property insurance policy maintained by Owner covering any loss, damage, or
consequential loss to Owner’s existing structures, buildings, or facilities in which any part of
the Work will occur, or to which any part of the Work will attach or adjoin; to adjacent
structures, buildings, or facilities of Owner; or to part or all of the completed or substantially
completed Workor after Final Completion, shall contain provisions to the effect that in the
event of payment of any loss or damage the insurer shall have no rights of recovery against
any insureds thereunder, or against Contractor, Subcontractors, or Engineer, or the officers,
directors, members, partners, employees, agents, consultants, or subcontractors of each and
any of them, and that the insured is allowed to waive the insurer’s rights of subrogation in a
written contract signed prior to the loss, damage, or consequential loss.
1. Owner waives all rights against Contractor, Subcontractors, and Engineer, and the
officers, directors, members, partners, employees, agents, consultants and
subcontractors of each and any of them, for all losses and damages caused by, arising out
of, or resulting from fire or any of the perils, risks, or causes of loss covered by such
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 27 of 69
Page 43 of 214
policies, but only to the extent of insurance proceeds received for such losses and
damages.
C. The waivers in this Paragraph 6.05 include the waiver of rights due to business interruption,
loss of use, or other consequential loss extending beyond direct physical loss or damage to
Owner’s property or the Work caused by, arising out of, or resulting from fire or other insured
peril, risk, or cause of loss.
D. Contractor shall be responsible for assuring that each Subcontract contains provisions
whereby the Subcontractor waives all rights against Owner, Contractor, all individuals or
entities identified in the Contract as insureds, the Engineer and its consultants, and the
officers, directors, members, partners, employees, agents, consultants, and subcontractors of
each and any of them, for all losses and damages caused by, arising out of, relating to, or
resulting from fire or other peril, risk, or cause of loss covered by builder’s risk insurance,
installation floater, and any other property insurance applicable to the Work.
6 .06 Receipt and Application of Property Insurance Proceeds
A. Any insured loss under the builder’s risk and other policies of property insurance required by
Paragraph 6.04 shall be adjusted and settled with the named insured that purchased the
policy. Such named insured shall act as fiduciary for the other insureds, and give notice to
such other insureds that adjustment and settlement of a claim is in progress. Any other
insured shall state its position regarding a claim for insured loss in writing within 14 days after
notice of such claim.
B. Proceeds for such insured losses may be made payable by the insurer either jointly to multiple
insureds, or to the named insured that purchased the policy in its own right and as fiduciary
for other insureds, subject to the requirements of any applicable mortgage clause. A named
insured receiving insurance proceeds under the builder’s risk and other policies of insurance
required by Paragraph 6.04 shall maintain such proceeds in a segregated account, and
distribute such proceeds in accordance with such agreement as the parties in interest may
reach, or as otherwise required under the dispute resolution provisions of this Contract or
applicable Laws and Regulations.
C. If no other special agreement is reached, Contractor shall repair or replace the damaged
Work, using allocated insurance proceeds.
ARTICLE 7—CONTRACTOR’S RESPONSIBILITIES
7 .01 Contractor’s Means and Methods of Construction
A. Contractor shall be solely responsible for the means, methods, techniques, sequences, and
procedures of construction.
B. If the Contract Documents note, or Contractor determines, that professional engineering or
other design services are needed to carry out Contractor’s responsibilities for construction
means, methods, techniques, sequences, and procedures, or for Site safety, then Contractor
shall cause such services to be provided by a properly licensed design professional, at
Contractor’s expense. Such services are not Owner-delegated professional design services
under this Contract, and neither Owner nor Engineer has any responsibility with respect to
(1) Contractor’s determination of the need for such services, (2) the qualifications or licensing
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 28 of 69
Page 44 of 214
of the design professionals retained or employed by Contractor, (3) the performance of such
services, or (4) any errors, omissions, or defects in such services.
7.02 Supervision and Superintendence
A. Contractor shall supervise, inspect, and direct the Work competently and efficiently, devoting
such attention thereto and applying such skills and expertise as necessary to perform the
Work in accordance with the Contract Documents.
B. At all times during the progress of the Work, Contractor shall assign a competent resident
superintendent who shall not be replaced without written approval of Owner, except under
extraordinary circumstances.
7.03 Labor; Working Hours
A. Contractor shall provide competent, suitably qualified personnel to survey and lay out the
Work and perform construction as required by the Contract Documents. Contractor shall
maintain good discipline and order at the Site.
B. Contractor shall be fully responsible to Owner for all acts and omissions of the Contractor
Parties, just as Contractor is responsible for Contractor’s own acts and omissions.
C. Except as otherwise required for the safety or protection of persons or the Work or property
at the Site or adjacent thereto, and except as otherwise stated in the Contract Documents, all
Work at the Site shall be performed during regular working hours, Monday through Friday.
Contractor shall not perform Work on a Saturday, Sunday, or any legal holiday. Contractor
may perform Work outside regular working hours or on Saturdays, Sundays, or legal holidays
only with Owner’s written consent, which shall not be unreasonably withheld.
1. As used in the Contract, “regular working hours” shall mean 7:00 AM to 6:00 PM.
2. As used in Contract, “legal holiday” shall mean each of the following:
Holiday Date
New Year’s Day January 1
Martin Luther King’s Birthday 3rd Monday in January
Good Friday Friday before Easter
Memorial Day Last Monday in May
Independence Day July 4
Labor Day 1st Monday in September
Thanksgiving Day 4th Thursday in November
Friday after Thanksgiving 4th Friday in November
Christmas Day December 25
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 29 of 69
Page 45 of 214
Bonus Christmas Day The first week day after Christmas Day,
unless otherwise determined by Owner
7.04 Services, Materials, and Equipment
A. Unless otherwise specified in the Contract Documents, Contractor shall provide and assume
full responsibility for all services, materials, equipment, labor, transportation, construction
equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water,
sanitary facilities, temporary facilities, and all other facilities and incidentals necessary for the
performance, testing, start up, and completion of the Work, whether or not such items are
specifically called for in the Contract Documents.
B. All materials and equipment incorporated into the Work shall be new and of good quality,
except as otherwise provided in the Contract Documents. All warranties and guarantees in or
required by the Contract Documents shall expressly run to the benefit of Owner. If required
by Owner, Contractor shall furnish satisfactory evidence (including but not limited to reports
of required tests) as to the source, kind, and quality of materials and equipment.
C. All materials and equipment shall be stored, applied, installed, connected, erected, protected,
used, cleaned, and conditioned in accordance with instructions of the applicable Supplier,
except as otherwise provided in the Contract Documents.
7.05 “Or Equals”
A. Contractor’s Request; Governing Criteria: Whenever an item of equipment or material is
specified or described in the Contract Documents by using the names of one or more
proprietary items or specific Suppliers, the Contract Price has been based upon Contractor
furnishing such item as specified. The specification or description of such an item is intended
to establish the type, function, appearance, and quality required. Unless the specification or
description contains or is followed by words reading that no like, equivalent, or “or equal”
item is permitted, Contractor may request that Owner authorize the use of other items of
equipment or material, or items from other proposed Suppliers, under the following
circumstances:
1. If Owner in its sole discretion determines that an item of equipment or material proposed
by Contractor is functionally equal to that named and sufficiently similar so that no
change in related Work will be required, Owner may deem it an “or equal” item. For the
purposes of this paragraph, a proposed item of equipment or material shall be considered
functionally equal to an item so named if:
a. in the exercise of reasonable judgment Owner determines that the proposed item:
1) is at least equal in materials of construction, quality, durability, appearance,
strength, and design characteristics;
2) will reliably perform at least equally well the function and achieve the results
imposed by the design concept of the completed Project as a functioning whole;
3) has a proven record of performance and availability of responsive service; and
4) is not objectionable to Owner.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 30 of 69
Page 46 of 214
b. Contractor certifies that, if the proposed item is approved and incorporated into the
Work:
1) there will be no increase in cost to the Owner or increase in Contract Times; and
2) the item will conform substantially to the detailed requirements of the item
named in the Contract Documents.
B. Contractor’s Expense: Contractor shall provide all data in support of any proposed “or equal”
item at Contractor’s expense.
C. Owner’s Evaluation and Determination: Owner shall be allowed a reasonable time to evaluate
each “or-equal” request. Owner may require Contractor to furnish additional data about the
proposed “or-equal” item. Owner shall be the sole judge of acceptability. No “or-equal” item
shall be ordered, furnished, installed, or utilized until Owner’s review is complete and Owner
determines that the proposed item is an “or-equal,” which shall be evidenced by an approved
Shop Drawing or other written communication. Owner shall advise Contractor in writing of
any negative determination.
D. Effect of Owner’s Determination: Neither approval nor denial of an “or-equal” request shall
result in any change in Contract Price. The Owner’s denial of an “or-equal” request shall be
final and binding, and may not be reversed through an appeal under any provision of the
Contract.
E. Treatment as a Substitution Request: If Owner determines that an item of equipment or
material proposed by Contractor does not qualify as an “or-equal” item, Contractor may
request that Owner consider the item a proposed substitute pursuant to Paragraph 7.06.
7.06 Substitutes
A. Contractor’s Request; Governing Criteria: Unless the specification or description of an item of
equipment or material required to be furnished under the Contract Documents contains or is
followed by words reading that no substitution is permitted, Contractor may request that
Owner authorize the use of other items of equipment or material under the following
circumstances (to the extent possible such requests shall be made before commencement of
related construction at the Site):
1. Contractor shall submit sufficient information as provided in this Paragraph 7.06.A to
allow Owner to determine if the item of material or equipment proposed is functionally
equivalent to that named and an acceptable substitute therefor. Owner shall not accept
requests for review of proposed substitute items of equipment or material from anyone
other than Contractor.
2. The requirements for review by Owner shall be as set forth in Paragraph 7.06.B, as
supplemented by the Specifications, and as Owner decides is appropriate under the
circumstances.
3. Contractor shall make written application to Owner for review of a proposed substitute
item of equipment or material that Contractor seeks to furnish or use. The application:
a. shall certify that the proposed substitute item will:
1) perform adequately the functions and achieve the results called for by the
general design;
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 31 of 69
Page 47 of 214
2) be similar in substance to the item specified; and
3) be suited for the same use as the item specified.
b. shall state:
1) the extent, if any, to which the use of the proposed substitute item will
necessitate a change in Contract Times;
2) whether use of the proposed substitute item in the Work will require a change in
any of the Contract Documents (or in the provisions of any other direct contract
with Owner for other work on the Project) to adapt the design to the proposed
substitute item; and
3) whether incorporation or use of the proposed substitute item in connection with
the Work is subject to payment of any license fee or royalty.
c. shall identify:
1) all variations of the proposed substitute item from the item specified; and
2) available engineering, sales, maintenance, repair, and replacement services.
d. shall contain an itemized estimate of all costs or credits that will result directly or
indirectly from use of such substitute item, including but not limited to changes in
Contract Price, shared savings, costs of redesign, and claims of other contractors
affected by any resulting change.
B. Owner’s Evaluation and Determination: Owner shall be allowed a reasonable time to evaluate
each substitute request. Owner may require Contractor to furnish additional data about the
proposed substitute item. Owner shall be the sole judge of acceptability. No substitute shall
be ordered, furnished, installed, or utilized until Owner’s review is complete and Owner
determines that the proposed item is an acceptable substitute. Owner’s determination shall
be evidenced by a Field Order or a proposed Change Order accounting for the substitution
itself and all related impacts, including changes in Contract Price or Contract Times. Owner
shall advise Contractor in writing of any negative determination.
C. Special Guarantee: Owner may require Contractor to furnish at Contractor’s expense a special
performance guarantee or other surety with respect to any substitute.
D. Reimbursement of Owner Cost: Contractor shall bear Owner’s costs in evaluating a substitute
proposed or submitted by Contractor. Whether or not Owner approves a substitute so
proposed or submitted by Contractor, Contractor shall reimburse Owner for the reasonable
charges of an engineer or other consultant for assistance in evaluating each such proposed
substitute. Contractor shall also reimburse Owner for the reasonable charges of an engineer
or other consultant for making changes in the Contract Documents (or in the provisions of
any other direct contract with Owner) resulting from the acceptance of each proposed
substitute.
E. Contractor’s Expense: Contractor shall provide all data in support of any proposed substitute
at Contractor’s expense.
F. Effect of Owner Determination: If Owner approves the substitution request, Contractor shall
sign the proposed Change Order and proceed with the substitution. Owner’s denial of a
substitution request shall be final and binding, and may not be reversed through an appeal
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 32 of 69
Page 48 of 214
under any provision of the Contract. Contractor may challenge the scope of reimbursement
costs imposed under Paragraph 7.06.D, by timely submittal of a Change Proposal.
7.07 Concerning Subcontractors and Suppliers
A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work,
subject to acceptance by Owner of such Subcontractors and Suppliers. The Contractor’s
retention of a Subcontractor or Supplier for the performance of parts of the Work shall not
relieve Contractor’s obligation to Owner to perform and complete the Work in accordance
with the Contract Documents.
B. Contractor shall retain specific Subcontractors and Suppliers for the performance of
designated parts of the Work if required by the Contract to do so.
C. Subsequent to the submittal of Contractor’s Bid, Owner may not require Contractor to retain
any Subcontractor or Supplier to furnish or perform any of the Work against which Contractor
has reasonable objection.
D. Prior to entry into any binding subcontract or purchase order, Contractor shall submit to
Owner in writing the identity of the proposed Subcontractor or Supplier (unless Owner has
already deemed such proposed Subcontractor or Supplier acceptable during the bidding
process or otherwise). Such proposed Subcontractor or Supplier shall be deemed acceptable
to Owner unless Owner raises a substantive, reasonable objection within 14 days after receipt
of Contractor’s written submission.
E. Owner may require the replacement of any Subcontractor or Supplier. Owner also may
require Contractor to retain specific replacements; provided, however, that Owner may not
require a replacement to which Contractor has a reasonable objection. If Contractor has
submitted the identity of certain Subcontractors or Suppliers for acceptance by Owner, and
Owner has accepted it (either in writing or by failing to make written objection thereto), then
Owner may subsequently revoke the acceptance of any such Subcontractor or Supplier so
identified solely on the basis of substantive, reasonable objection after due investigation.
Contractor shall submit an acceptable replacement for the rejected Subcontractor or
Supplier.
F. If Owner requires the replacement of any Subcontractor or Supplier retained by Contractor
to perform any part of the Work, then Contractor shall be entitled to an adjustment in
Contract Price or Contract Times with respect to the replacement; and Contractor shall initiate
a Change Proposal for such adjustment within 30 days after Owner’s requirement of
replacement.
G. No acceptance by Owner of any such Subcontractor or Supplier, whether initially or as a
replacement, shall constitute a waiver of the right of Owner to the completion of the Work in
accordance with the Contract Documents.
H. On a monthly basis, Contractor shall submit to Owner a complete list of all Subcontractors
and Suppliers having a direct contract with Contractor, and of all other Subcontractors and
Suppliers known to Contractor at the time of submittal.
I. Contractor shall be solely responsible for scheduling and coordinating the work of
Subcontractors and Suppliers.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 33 of 69
Page 49 of 214
J. The divisions and sections of the Specifications and the identifications of any Drawings do not
control Contractor in dividing the Work among Subcontractors or Suppliers, or in delineating
the Work to be performed by any specific trade.
K. All Work performed for Contractor by a Subcontractor or Supplier shall be pursuant to an
appropriate written contractual agreement that specifically binds the Subcontractor or
Supplier to the applicable provisions of the Contract for the benefit of Owner. Contractor shall
furnish to Owner copies of all agreements with Subcontractors as requested by Owner.
L. Owner may furnish to any Subcontractor or Supplier, to the extent practicable, information
about amounts paid to Contractor for Work performed for Contractor by the Subcontractor
or Supplier.
M. Contractor shall restrict all Subcontractors and Suppliers from communicating with Engineer
and Owner, except through Contractor or in case of an emergency, or as otherwise expressly
allowed in this Contract.
7.08 Patent Fees and Royalties
A. Contractor shall pay all license fees and royalties and assume all costs incident to the use in
the performance of the Work or the incorporation in the Work of any invention, design,
process, product, or device that is the subject of patent rights or copyrights held by others. If
an invention, design, process, product, or device is specified in the Contract Documents for
use in the performance of the Work and if, to the actual knowledge of Owner or Engineer, its
use is subject to patent rights or copyrights calling for the payment of any license fee or
royalty to others, the existence of such rights shall be disclosed in the Contract Documents.
B. To the full extent permitted by Laws and Regulations, Owner shall indemnify and hold
harmless Contractor, and its officers, directors, members, partners, employees, agents,
consultants, and subcontractors, from and against all claims, costs, losses, and damages
(including but not limited to all fees and charges of engineers, architects, attorneys, and other
professionals, and all court or arbitration or other dispute resolution costs) arising out of or
relating to any infringement of patent rights or copyrights incident to the proper use in the
performance of the Work or resulting from the incorporation in the Work of any invention,
design, process, product, or device specified in the Contract Documents, but not identified as
being subject to payment of any license fee or royalty to others required by patent rights or
copyrights.
C. To the full extent permitted by Laws and Regulations, Contractor shall defend (at Owner’s
option in its sole discretion), indemnify and hold harmless the Owner Parties and Engineer,
and consultants and subcontractors of each and any of them, from and against all claims,
costs, losses, and damages (including but not limited to all fees and charges of engineers,
architects, attorneys, and other professionals and all court or arbitration or other dispute
resolution costs) arising out of or relating to any infringement of patent rights or copyrights
incident to the use in the performance of the Work or resulting from the incorporation in the
Work of any invention, design, process, product, or device not specified in the Contract
Documents.
7.09 Permits
A. Unless otherwise provided in the Contract Documents, Contractor shall obtain and pay for all
construction permits, licenses, and certificates of occupancy. Owner shall assist Contractor,
when necessary, in obtaining such permits and licenses. Contractor shall pay all governmental
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 34 of 69
Page 50 of 214
charges and inspection fees necessary for the prosecution of the Work that are applicable at
the time of the submission of Contractor’s Bid. Owner shall pay all charges of utility owners
for connections for providing permanent service to the Work.
B. If Owner acquires any permits from CSX, U.S. Army Corps of Engineers, Tennessee
Department Environment and Conservation, Tennessee Department of Transportation,
Williamson County, City of Franklin, or other utilities or agencies, the terms of the restrictions
and conditions applicable to such permits shall be disclosed to Contractor, and Contractor
shall perform the Work in accordance with all such restrictions and conditions.
7.10 Taxes
A. Contractor shall pay all sales, consumer, use, and other similar taxes required to be paid by
Contractor in accordance with Laws and Regulations.
7.11 Laws and Regulations
A. Contractor shall give all notices required by and shall comply with all Laws and Regulations.
Neither Owner nor Engineer shall be responsible for monitoring Contractor’s compliance with
any Laws or Regulations.
B. If any of the Contractor Parties performs any Work or takes any other action knowing or
having reason to know that it is contrary to Laws or Regulations, Contractor shall bear all
resulting costs and losses, and shall, to the full extent permitted by Laws and Regulations,
defend (at Owner’s option in its sole discretion), indemnify and hold harmless the Owner
Parties and Engineer, and consultants, and subcontractors of each and any of them, from and
against all claims, costs, losses, and damages (including but not limited to all fees and charges
of engineers, architects, attorneys, and other professionals and all court or arbitration or
other dispute resolution costs) arising out of or relating to such Work or other action. It is not
Contractor’s responsibility to make certain that the Work described in the Contract
Documents is in accordance with Laws and Regulations, but this does not relieve Contractor
of its obligations under Paragraph 3.03.
C. Owner or Contractor may give written notice to the other party of any changes after the
submission of Contractor’s Bid in Laws or Regulations having an effect on the cost or time of
performance of the Work, including but not limited to changes in Laws or Regulations having
an effect on procuring permits and on sales, use, value-added, consumption, and other similar
taxes. If Owner and Contractor are unable to agree on entitlement to or on the amount or
extent, if any, of any adjustment in Contract Price or Contract Times resulting from such
changes, then within 14 days after such written notice Contractor may submit a Change
Proposal, or Owner may initiate a Claim at any time.
7.12 Record Documents
A. Contractor shall maintain in a safe place at the Site one printed record copy of all Drawings,
Specifications, Addenda, Change Orders, Work Change Directives, Field Orders, written
interpretations and clarifications, and approved Shop Drawings. Contractor shall keep such
record documents in good order and annotate them to show changes made during
construction. These record documents, together with all approved Samples, shall be available
to Owner for reference. Upon Final Completion of the Work, Contractor shall deliver these
record documents to Owner.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 35 of 69
Page 51 of 214
7.13 Safety and Protection
A. Contractor shall be solely responsible for initiating, maintaining, and supervising all safety
precautions and programs in connection with the Work. Such responsibility does not relieve
Subcontractors or Suppliers of their responsibility for the safety of persons or property in the
performance of their Work, nor for compliance with applicable safety Laws and Regulations.
B. Contractor shall designate a qualified and experienced safety representative whose duties
and responsibilities are the prevention of Work-related accidents and the maintenance and
supervision of safety precautions and programs.
C. Contractor shall take all necessary precautions for the safety of and shall provide the
necessary protection to prevent damage, injury, or loss to:
1. all persons on the Site or who might be affected by the Work;
2. all the Work, materials, and equipment to be incorporated therein, whether in storage on
or off the Site; and
3. other property at the Site or adjacent thereto, including but not limited to trees, shrubs,
lawns, walks, pavements, roadways, structures, other work in progress, utilities, and
Underground Facilities not designated for removal, relocation, or replacement in the
course of construction.
D. All damage, injury, or loss to any property referred to in Paragraph 7.13.C.2 or 7.13.C.3
caused, directly or indirectly, in whole or in part, by any of the Contractor Parties shall be
remedied by Contractor at its expense (except damage or loss attributable to the fault of
Drawings or Specifications or to the acts or omissions of Owner or Engineer or anyone
employed by any of them, or anyone for whose acts any of them is liable, and not attributable,
directly or indirectly, in whole or in part, to the fault or negligence of any of the Contractor
Parties).
E. Contractor shall comply with all applicable Laws and Regulations relating to the safety of
persons or property, or to the protection of persons or property from damage, injury, or loss;
and shall erect and maintain all necessary safeguards for such safety and protection.
Contractor shall promptly notify Owner of any damage, injury, or loss to the persons or
property of the type referred to in Paragraph 7.13.C.
F. Contractor shall notify Owner; the owners of adjacent property; the owners of Underground
Facilities and other utilities (if the identity of such owners is known to Contractor); and other
contractors and utility owners performing work at or adjacent to the Site, in writing, when
Contractor knows the Work might affect them, and shall cooperate with them in the
protection, removal, relocation, and replacement of their property or work in progress.
G. Contractor shall comply with the applicable requirements of Owner’s safety programs, if any,
but such responsibility shall not affect Contractor’s other obligations under this Paragraph
7.13. Any of Owner’s safety programs that are applicable to the Work are identified or
included in the Contract Documents. Contractor shall immediately notify Owner if Contractor
thinks any of Owner’s safety programs might not be safe or might conflict with Contractor’s
other obligations.
H. Contractor shall inform Owner and Engineer of the specific requirements of Contractor’s
safety program with which Owner’s and Engineer’s employees and representatives shall
comply while at the Site.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 36 of 69
Page 52 of 214
I. Contractor’s duties and responsibilities for safety and protection shall continue until all the
Work is completed and Contractor has left the Site (except as otherwise expressly provided
in the Contract Documents in connection with Substantial Completion).
J. Contractor’s duties and responsibilities for safety and protection shall resume whenever
Contractor or any Subcontractor or Supplier returns to the Site to fulfill warranty or correction
obligations, or to conduct other tasks arising from the Contract Documents.
K. Prohibition of Firearms and Weapons
1. Contractor, its employees, subcontractors, suppliers, and any other persons under the
Contractor’s control shall not bring, carry, or possess any firearm, weapon, explosive device,
or any other dangerous instrument onto the Project Site, in vehicles used in connection with
the Project, or in any Owner- or Engineer-provided facilities, except as otherwise required by
law.
2. This prohibition is subject to applicable Tennessee law, including but not limited to Tenn.
Code Ann. § 39-17-1359, which permits property owners or entities in control of property to
prohibit weapons on premises by posting proper signage. The Owner shall post appropriate
signage in accordance with Tennessee law to enforce this prohibition.
3. Enforcement and Remedies. Violation of this provision shall be considered a material
breach of contract and may result in disciplinary action, including but not limited to removal
from the Project Site, termination of the Contract, or other remedies available to the Owner
under the Contract and applicable law.
7.14 Hazard Communication Programs
A. Contractor shall be responsible for coordinating any exchange of safety data sheets (formerly
known as material safety data sheets) or other hazard communication information required
to be made available to or exchanged between or among employers at the Site in accordance
with Laws or Regulations.
7.15 Emergencies
A. In emergencies affecting the safety or protection of persons or the Work or property at the
Site or adjacent thereto, Contractor is obligated to act to prevent damage, injury, or loss.
Contractor shall give Owner prompt written notice if Contractor believes that any significant
changes in the Work or variations or deviations from the Contract Documents have been
caused by an emergency, or are required as a result of Contractor’s response to an
emergency. If Owner determines that a change in the Contract Documents is required
because of an emergency or Contractor’s response, a Work Change Directive or Change Order
shall be issued.
7.16 Submittals
A. Shop Drawing and Sample Requirements
1. Before submitting a Shop Drawing or Sample, Contractor shall:
a. review and coordinate the Shop Drawing or Sample with other Shop Drawings and
Samples and with the requirements of the Work and the Contract Documents;
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 37 of 69
Page 53 of 214
b. determine and verify:
1) all field measurements, quantities, dimensions, specified performance and design
criteria, installation requirements, materials, catalog numbers, and similar
information with respect to the Submittal;
2) the suitability of all materials and equipment offered with respect to the indicated
application, fabrication, shipping, handling, storage, assembly, and installation
pertaining to the performance of the Work; and
3) all information relative to Contractor’s responsibilities for means, methods,
techniques, sequences, and procedures of construction, and safety precautions
and programs incident thereto; and
c. confirm that the Submittal is complete with respect to all related data included in the
Submittal.
2. Each Shop Drawing or Sample shall bear a stamp or specific written certification that
Contractor has satisfied Contractor’s obligations under the Contract Documents with
respect to Contractor’s review of that Submittal, and that Contractor approves the
Submittal.
3. With each Shop Drawing or Sample, Contractor shall give Owner specific written notice
of any variations that the Submittal has from the requirements of the Contract
Documents. This notice shall be set forth in a written communication separate from the
Submittal; and, in addition, in the case of a Shop Drawing by a specific notation made on
the Shop Drawing itself.
B. Submittal Procedures for Shop Drawings and Samples: Contractor shall label and submit Shop
Drawings and Samples to Owner for review and approval in accordance with the accepted
Schedule of Submittals.
1. Shop Drawings
a. Contractor shall submit the number of copies required in the Specifications.
b. Data shown on the Shop Drawings shall be complete with respect to quantities,
dimensions, specified performance and design criteria, materials, and similar data to
show Owner the services, materials, and equipment Contractor proposes to provide,
and to enable Owner to review the information for the limited purposes required by
Paragraph 7.16.C.
2. Samples
a. Contractor shall submit the number of Samples required in the Specifications.
b. Contractor shall clearly identify each Sample as to material, Supplier, pertinent data
such as catalog numbers, the use for which intended and other data as Owner
requires to enable Owner to review the Submittal for the limited purposes required
by Paragraph 7.16.C.
3. Where a Shop Drawing or Sample is required by the Contract Documents or the Schedule
of Submittals, any related Work performed prior to Owner’s review and approval of the
pertinent submittal shall be at the sole expense and responsibility of Contractor.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 38 of 69
Page 54 of 214
C. Owner’s Review of Shop Drawings and Samples
1. Owner shall provide timely review of Shop Drawings and Samples in accordance with the
accepted Schedule of Submittals. Owner’s review and approval shall be only to determine
if the items covered by the Submittals will, after installation or incorporation in the Work,
comply with the requirements of the Contract Documents, and be compatible with the
design concept of the completed Project as a functioning whole as indicated by the
Contract Documents.
2. Owner’s review and approval shall not extend to means, methods, techniques,
sequences, or procedures of construction, or to safety precautions or programs incident
thereto.
3. Owner’s review and approval of a separate item as such shall not indicate approval of the
assembly in which the item functions.
4. Owner’s review and approval of a Shop Drawing or Sample shall not relieve Contractor
from responsibility for any variation from the requirements of the Contract Documents
unless Contractor has complied with the requirements of Paragraph 7.16.A.3 and Owner
has given written approval of each such variation by specific written notation thereof
incorporated in or accompanying the Shop Drawing or Sample. Owner shall document
any such approved variation from the requirements of the Contract Documents in a Field
Order or other appropriate Contract modification.
5. Owner’s review and approval of a Shop Drawing or Sample shall not relieve Contractor
from responsibility for complying with the requirements of Paragraphs 7.16.A and B.
6. Owner’s review and approval of a Shop Drawing or Sample, or of a variation from the
requirements of the Contract Documents, shall not, under any circumstances, change the
Contract Times or Contract Price, unless such changes are included in a Change Order.
7. Neither Owner’s receipt, review, acceptance, or approval of a Shop Drawing or Sample
shall result in such item becoming a Contract Document.
8. Contractor shall perform the Work in compliance with the requirements and
commitments set forth in approved Shop Drawings and Samples, subject to the provisions
of Paragraph 7.16.C.4.
D. Resubmittal Procedures for Shop Drawings and Samples
1. Contractor shall make corrections required by Owner and shall return the required
number of corrected copies of Shop Drawings and submit, as required, new Samples for
review and approval. Contractor shall direct specific attention in writing to revisions other
than the corrections called for by Owner on previous Submittals.
2. Contractor shall furnish required Shop Drawing and Sample submittals with sufficient
information and accuracy to obtain required approval of an item with no more than two
resubmittals. Contractor shall bear Owner’ costs for reviewing a third or subsequent
resubmittal of a Shop Drawing or Sample, and Contractor shall be responsible for an
engineer’s or other consultant’s charges to Owner for assistance with such review. Owner
may impose a set-off against payments due Contractor to secure reimbursement for such
charges.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 39 of 69
Page 55 of 214
3. If Contractor requests a change of a previously approved Shop Drawing or Sample,
Contractor shall be responsible for an engineer’s or other consultant’s charges to Owner
for its review time, and Owner may impose a set-off against payments due Contractor to
secure reimbursement for such charges, unless the need for such change is beyond the
control of Contractor.
E. Submittals Other than Shop Drawings, Samples, and Owner-Delegated Designs
1. The following provisions apply to all Submittals other than Shop Drawings, Samples, and
Owner-delegated designs:
a. Contractor shall submit all such Submittals to Owner in accordance with the Schedule
of Submittals and pursuant to the applicable provisions of the Contract Documents.
b. Owner shall provide timely review of all such Submittals in accordance with the
Schedule of Submittals and return such Submittals with a notation of either Accepted
or Not Accepted. Any such Submittal that is not returned within the time established
in the Schedule of Submittals shall be deemed accepted.
c. Owner’s review shall be only to determine if the Submittal is acceptable under the
requirements of the Contract Documents as to general form and content of the
Submittal.
d. If any such Submittal is not accepted, Contractor shall confer with Owner regarding
the reason for the non-acceptance, and resubmit an acceptable document.
2. Procedures for the submittal and acceptance of the Progress Schedule, the Schedule of
Submittals, and the Schedule of Values are set forth in Paragraphs 2.03. 2.04, and 2.05.
F. Owner-delegated Designs: Submittals pursuant to Owner-delegated designs are governed by
the provisions of Paragraph 7.19.
7.17 Contractor’s General Warranty and Guarantee
A. Contractor warrants and guarantees to Owner that all Work will be of good quality, new
(unless the Contract Documents permit otherwise) and in accordance with the Contract
Documents, and will not be defective. Owner is entitled to rely on Contractor’s warranty and
guarantee.
B. Owner’s rights under this warranty and guarantee are in addition to, and are not limited by,
Owner’s rights under the correction period provisions of Paragraph 15.06. The time in which
Owner may enforce its warranty and guarantee rights under this Paragraph 7.17 is limited
only by applicable Laws and Regulations restricting actions to enforce such rights; provided,
however, that after the end of the correction period under Paragraph 15.06:
1. Owner shall give Contractor written notice of any defective Work within 60 days after
Owner’s discovery that such Work is defective; and
2. Such notice shall be deemed the start of an event giving rise to a Claim under
Paragraph 12.01.B, such that any related Claim shall be brought within 30 days after the
notice.
C. Contractor’s warranty and guarantee hereunder excludes defects or damage caused by:
1. abuse, or improper modification, maintenance, or operation, by persons other than any
of the Contractor Parties; or
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 40 of 69
Page 56 of 214
2. normal wear and tear under normal usage.
D. Contractor’s obligations to perform and complete the Work and other obligations in
accordance with the Contract Documents is absolute. No approval, consent, acceptance, or
other action or exercise of rights by Owner, including but not limited to those set forth below
in this Paragraph 7.17.D, shall constitute an acceptance of Work or performance by
Contractor that is not in accordance with the Contract Documents, a release of Contractor’s
obligation to perform the Work in accordance with the Contract Documents, or a release of
Owner’s warranty and guarantee rights under the Contract Documents:
1. Any of Owner’s or Engineer’s rights or obligations under Article 10, including but not
limited to site visits or observations by Owner or Engineer;
2. Payment by Owner of any progress or final payment;
3. Use or occupancy of the Work or any part thereof by Owner;
4. Any review and approval of a Submittal, Shop Drawing, Sample submittal or schedule;
5. The issuance of a notice of acceptability;
6. The end of the correction period established in Paragraph 15.06;
7. Any inspection, test, or approval by others; or
8. Any correction of defective Work by Owner.
E. If the Contract requires the Contractor to accept the assignment of a contract entered into by
Owner, then the specific warranties, guarantees, and correction obligations contained in the
assigned contract shall govern with respect to Contractor’s performance obligations to Owner
for the Work described in the assigned contract.
7.18 Indemnification
A. To the full extent permitted by Laws and Regulations, and in addition to any other obligations
of Contractor under the Contract or otherwise, Contractor shall defend (at Owner’s option in
its sole discretion), indemnify and hold harmless the Owner Parties and Engineer, and
consultants and subcontractors of each and any of them, from and against all claims, actions,
liabilities, losses, damages, costs, expenses and judgments (including but not limited to all
fees and charges of engineers, architects, attorneys, and other professionals, and all court or
arbitration or other dispute resolution costs) arising out of, relating to or resulting from the
performance, or failure in performance, of the Work, provided that such claim, action,
liability, loss, cost, expense, judgment or damage is attributable, in whole or in part to any act
or omission of any of the Contractor Parties.
B. In any and all claims against any of the Owner Parties or Engineer, or any of their consultants
or subcontractors, by any employee (or the survivor or personal representative of such
employee) of any of the Contractor Parties, the defense and indemnification obligations
under Paragraph 7.18.A shall not be limited in any way by any limitation on the amount or
type of damages, compensation, or benefits payable by or for any of the Contractor Parties
under workers’ compensation acts, disability benefit acts, or other employee benefit acts.
7.19 Delegation of Professional Design Services
A. Owner may require Contractor to provide professional design services for a portion of the
Work by express delegation in the Contract Documents. Such delegation shall specify the
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 41 of 69
Page 57 of 214
performance and design criteria that such services shall satisfy, and the Submittals that
Contractor shall furnish to Owner with respect to the Owner-delegated design.
B. Contractor shall cause such Owner-delegated professional design services to be provided
pursuant to the professional standard of care by a properly licensed design professional,
whose signature and seal shall appear on all drawings, calculations, specifications,
certifications, and Submittals prepared by such design professional. Such design professional
shall issue all certifications of design required by Laws and Regulations.
C. If a Shop Drawing or other Submittal related to the Owner-delegated design is prepared by
Contractor, a Subcontractor, then such Shop Drawing or other Submittal shall bear the written
approval of Contractor’s design professional when submitted by Contractor.
D. Owner and Engineer shall be entitled to rely upon the adequacy, accuracy, and completeness
of the services, certifications, and approvals performed or provided by the design
professionals retained or employed by Contractor under an Owner-delegated design, subject
to the professional standard of care and the performance and design criteria stated in the
Contract Documents.
E. Pursuant to this Paragraph 7.19, Owner’s review, approval, and other determinations
regarding design drawings, calculations, specifications, certifications, and other Submittals
furnished by Contractor pursuant to an Owner-delegated design shall be only for the following
limited purposes:
1. Checking for conformance with the requirements of this Paragraph 7.19;
2. Confirming that Contractor (through its design professionals) has used the performance
and design criteria specified in the Contract Documents; and
3. Establishing that the design furnished by Contractor is consistent with the design concept
expressed in the Contract Documents.
F. Contractor shall not be responsible for the adequacy of performance or design criteria
specified by Owner or Engineer.
G. Contractor is not required to provide professional services in violation of applicable Laws and
Regulations, and Contractor shall promptly notify Owner if Contractor relies on or invokes this
provision.
ARTICLE 8—OTHER WORK AT THE SITE
8.01 Other Work
A. In addition to and apart from the Work under the Contract Documents, the Owner may
perform other work at or adjacent to the Site. Such other work may be performed by Owner’s
employees, or through contracts between the Owner and third parties. Owner may also
arrange to have third-party utility owners perform work on their utilities and facilities at or
adjacent to the Site.
B. If Owner performs other work at or adjacent to the Site with Owner’s employees, or through
contracts for such other work, then Owner shall give Contractor written notice thereof prior
to starting any such other work. If Owner has advance information regarding the start of any
third-party utility work that Owner has arranged to take place at or adjacent to the Site,
Owner shall provide such information to Contractor.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 42 of 69
Page 58 of 214
C. Contractor shall afford proper and safe access to the Site to each contractor that performs
such other work, each utility owner performing other work, and Owner, if Owner is
performing other work with Owner’s employees, and provide a reasonable opportunity for
the introduction and storage of materials and equipment and the performance of such other
work.
D. Contractor shall do all cutting, fitting, and patching of the Work that is required to properly
connect or otherwise make its several parts come together and properly integrate with such
other work. Contractor shall not endanger any work of others by cutting, excavating, or
otherwise altering such work; provided, however, that Contractor may cut or alter others'
work with the written consent of Owner and the others whose work will be affected.
E. If the proper performance or results of any part of Contractor’s Work depends upon work
performed by others, Contractor shall inspect such other work and promptly report to Owner
in writing any delays, defects, or deficiencies in such other work that render it unavailable or
unsuitable for the proper performance and results of Contractor’s Work. Contractor’s failure
to so report shall constitute an acceptance of such other work as fit and proper for integration
with Contractor’s Work except for latent defects and latent deficiencies in such other work.
F. The provisions of this article are not applicable to work that is performed by third-party
utilities or other third-party entities without a contract with Owner, or that is performed
without having been arranged by Owner. If such work occurs, then any related delay,
disruption, or interference incurred by Contractor is governed by the provisions of
Paragraph 4.05.C.3.
8.02 Coordination
A. If Owner intends to contract with others for the performance of other work at or adjacent to
the Site, to perform other work at or adjacent to the Site with Owner’s employees, or to
arrange to have utility owners perform work at or adjacent to the Site, the following shall be
provided to Contractor prior to the start of any such other work:
1. The identity of the individual or entity that will have authority and responsibility for
coordination of the activities among the various contractors;
2. An itemization of the specific matters to be covered by such authority and responsibility;
and
3. The extent of such authority and responsibilities.
B. Unless otherwise provided in the Contract Documents, Owner shall have sole authority and
responsibility for such coordination.
8 .03 Legal Relationships
A. If, in the course of performing other work for Owner at or adjacent to the Site, the Owner’s
employees, any other contractor working for Owner, or any utility owner that Owner has
arranged to perform work, causes damage to the Work or to the property of Contractor or its
Subcontractors, or delays, disrupts, interferes with, or increases the scope or cost of the
performance of the Work, through actions or inaction, then Contractor shall be entitled to an
adjustment in the Contract Price or the Contract Times, each as reasonably determined by
Owner. Contractor shall submit any Change Proposal seeking an adjustment in the Contract
Price or the Contract Times under this paragraph within 14 days after the damaging, delaying,
disrupting, or interfering event. The entitlement to, and extent of, any such adjustment shall
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 43 of 69
Page 59 of 214
take into account information (if any) regarding such other work that was provided to
Contractor in the Contract Documents prior to the submittal of the Bid, and any remedies
available to Contractor under Laws or Regulations concerning utility action or inaction. When
applicable, any such adjustment in Contract Price shall be conditioned on Contractor assigning
to Owner all Contractor’s rights against such other contractor or utility owner with respect to
the damage, delay, disruption, or interference that is the subject of the adjustment.
Contractor’s entitlement to an adjustment of the Contract Times or Contract Price is subject
to the provisions of Paragraphs 4.05.D and 4.05.E.
B. Contractor shall take reasonable and customary measures to avoid damaging, delaying,
disrupting, or interfering with the work of Owner, any other contractor, or any utility owner
performing other work at or adjacent to the Site.
1. If Contractor fails to take such measures and as a result damages, delays, disrupts, or
interferes with the work of any such other contractor or utility owner, then Owner may
impose a set-off against payments due Contractor, and assign to such other contractor or
utility owner the Owner’s contractual rights against Contractor with respect to the breach
of the obligations set forth in this Paragraph 8.03.B.
2. When Owner is performing other work at or adjacent to the Site with Owner’s employees,
Contractor shall be liable to Owner for damage to such other work, and for the reasonable
direct delay, disruption, and interference costs incurred by Owner as a result of
Contractor’s failure to take reasonable and customary measures with respect to Owner’s
other work. In response to such damage, delay, disruption, or interference, Owner may
impose a set-off against payments due Contractor.
C. If Contractor damages, delays, disrupts, or interferes with the work of any other contractor,
or any utility owner performing other work at or adjacent to the Site, through Contractor’s
failure to take reasonable and customary measures to avoid such impacts, or if any claim
arising out of Contractor’s actions, inactions, or negligence in performance of the Work at or
adjacent to the Site is made by any such other contractor or utility owner against Contractor,
any of the Owner Parties, or Engineer, then Contractor shall (1) promptly attempt to settle
the claim as to all parties through negotiations with such other contractor or utility owner, or
otherwise resolve the claim by arbitration or other dispute resolution proceeding or at law,
and (2) to the full extent permitted by Laws and Regulations, defend (at Owner’s option in its
sole discretion), indemnify and hold harmless the Owner Parties and Engineer, and
consultants and subcontractors of each and any of them from and against all such claims, and
against all costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration or other
dispute resolution costs) arising out of or relating to such damage, delay, disruption, or
interference.
ARTICLE 9—OWNER’S RESPONSIBILITIES
9 .01 Communications to Contractor
A. Except as otherwise provided in these General Conditions, Owner shall issue all
communications directly to Contractor.
B. Owner’s Designated Representative identified in the Agreement (or the applicable Work
Order), and Owner’s City Administrator, Assistant City Administrator, City Engineer, and
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 44 of 69
Page 60 of 214
Department Directors, are the only individuals authorized to give approvals, consents, and
otherwise act on Owner’s behalf under the Contract Documents, including with respect to,
but not limited to, Change Orders, Work Change Directives, Change Proposals, Field Orders,
amendments, and other modifications to the Contract. From time to time, Owner may also
designate in writing other representatives who are authorized to act on Owner’s behalf.
C. In any event, any modification to the Contract in the amount of $25,000 or greater shall be
effective only if signed by Owner’s City Administrator, and all modifications to the Contract
are subject to final written approval by the City of Franklin Board of Mayor and Aldermen.
9 .02 Replacement and Role of Engineer
A. Owner may at its discretion appoint an engineer to replace Engineer, provided Contractor
makes no reasonable objection to the replacement engineer. The replacement engineer’s
status under the Contract Documents shall be that of the former Engineer.
B. At Owner’s sole discretion, Owner may utilize Engineer to assist with any of Owner’s rights,
duties, responsibilities, and obligations under the Contract during construction of the Work,
and, with prior written notice to Contractor, may engage Engineer to carry out and administer
such rights, duties and obligations on Owner’s behalf.
9 .03 Furnish Data
A. Owner shall promptly furnish the data required of Owner under the Contract Documents.
9 .04 Pay When Due
A. Owner shall make payments to Contractor when they are due as provided in the Agreement
(or the applicable Work Order).
9.05 Lands and Easements; Reports, Tests, and Drawings
A. Owner’s duties with respect to providing lands and easements are set forth in Paragraph 5.01.
B. Owner’s duties with respect to providing engineering surveys to establish reference points
are set forth in Paragraph 4.03.
C. Article 5 refers to Owner’s identifying and making available to Contractor copies of reports of
explorations and tests of conditions at the Site, and drawings of physical conditions relating
to existing surface or subsurface structures at the Site.
9.06 Insurance
A. Owner’s responsibilities, if any, with respect to purchasing and maintaining liability and
property insurance are set forth in Article 6.
9.07 Change Orders
A. Owner’s responsibilities with respect to Change Orders are set forth in Article 11.
9.08 Inspections, Tests, and Approvals
A. Owner’s responsibility with respect to certain inspections, tests, and approvals is set forth in
Paragraph 14.02.B.
9.09 Limitations on Owner’s Responsibilities
A. The Owner shall not supervise, direct, or have control or authority over, nor be responsible
for, Contractor’s means, methods, techniques, sequences, or procedures of construction, or
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 45 of 69
Page 61 of 214
the safety precautions and programs incident thereto, or for any failure of Contractor to
comply with Laws and Regulations applicable to the performance of the Work. Owner shall
not be responsible for Contractor’s failure to perform the Work in accordance with the
Contract Documents.
9.10 Undisclosed Hazardous Environmental Condition
A. Owner’s responsibility in respect to an undisclosed Hazardous Environmental Condition is set
forth in Paragraph 5.06.
9.11 Evidence of Financial Arrangements
A. Upon the reasonable request of Contractor, Owner shall furnish Contractor reasonable
evidence that financial arrangements have been made to satisfy Owner’s obligations under
the Contract (including obligations under proposed changes in the Work).
9.12 Safety Programs
A. While at the Site, Owner’s employees and representatives shall comply with the specific
applicable requirements of Contractor’s safety programs of which Owner has been informed.
B. Owner shall furnish copies of any applicable Owner safety programs to Contractor.
ARTICLE 10—ENGINEER’S AND OWNER’S STATUS DURING CONSTRUCTION
10.01 Authority of Engineer
A. The duties and responsibilities and the limitations of authority of Engineer during
construction, if any, are set forth in the Contract.
10.02 Visits to Site
A. Owner and Engineer may make visits to the Site at intervals appropriate to the various stages
of construction as Owner deems necessary in order to observe the progress that has been
made and the quality of the various aspects of Contractor’s Work. Based on information
obtained during such visits and observations, Owner may determine, in general, if the Work
is proceeding in accordance with the Contract Documents. Owner shall not be required to
make exhaustive or continuous inspections on the Site to check the quality or quantity of the
Work. Owner’s efforts shall be directed toward providing for Owner a degree of confidence
that the completed Work will conform generally to the Contract Documents.
10.03 Determinations for Unit Price Work
A. Owner shall determine the actual quantities and classifications of Unit Price Work performed
by Contractor as set forth in Paragraph 13.03.
10.04 Decisions on Requirements of Contract Documents and Acceptability of Work
A. Owner shall render decisions regarding the requirements of the Contract Documents, and
judge the acceptability of the Work, pursuant to the specific procedures set forth herein for
initial interpretations, Change Proposals, and acceptance of the Work.
10.05 Limitations on Owner’s Authority and Responsibilities
A. Neither Owner’s authority or responsibility under this Article 10, nor any decision made by
Owner in good faith either to exercise or not exercise such authority or responsibility, shall
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 46 of 69
Page 62 of 214
create, impose, or give rise to any duty in contract, tort, or otherwise owed by Owner to any
of the Contractor Parties.
B. Owner shall not supervise, direct, control, or have authority over or be responsible for
Contractor’s means, methods, techniques, sequences, or procedures of construction, or the
safety precautions and programs incident thereto, or for any failure of Contractor to comply
with Laws and Regulations applicable to the performance of the Work. Owner shall not be
responsible for Contractor’s failure to perform the Work in accordance with the Contract
Documents.
C. Owner shall not be responsible for the acts or omissions of Contractor or of any
Subcontractor, any Supplier, or of any other individual or entity performing any of the Work.
D. Owner’s review of the final Application for Payment and accompanying documentation, and
all maintenance and operating instructions, schedules, guarantees, bonds, certificates of
inspection, tests and approvals, and other documentation required to be delivered by
Contractor under Paragraph 15.04.A, shall only be to determine generally that their content
complies with the requirements of, and in the case of certificates of inspections, tests, and
approvals, that the results certified indicate compliance with, the Contract Documents.
10 .06 Compliance with Safety Program
A. While at the Site, Owner’s employees and representatives shall comply with the specific
applicable requirements of Contractor’s safety programs.
ARTICLE 11—CHANGES TO THE CONTRACT
11 .01 Amending and Supplementing the Contract
A. The Contract may be amended or supplemented by a Change Order, a Work Change Directive,
or a Field Order.
B. If an amendment or supplement to the Contract includes a change in the Contract Price or
the Contract Times, such amendment or supplement shall be set forth in a Change Order.
11.02 Change Orders
A. Owner and Contractor shall sign appropriate Change Orders covering:
1. Changes in Contract Price or Contract Times agreed to by the parties, including any
undisputed sum or amount of time for Work actually performed in accordance with a
Work Change Directive;
2. Changes in Contract Price resulting from an Owner set-off, unless Contractor has duly
contested such set-off by submitting a Claim;
3. Changes in the Work: (a) ordered by Owner pursuant to Paragraph 11.05, (b) required
because of Owner’s acceptance of defective Work under Paragraph 14.04 or Owner’s
correction of defective Work under Paragraph 14.07, or (c) agreed to by the parties; and
4. Changes that embody the substance of any final and binding results under:
Paragraph 11.03.B, resolving the impact of a Work Change Directive; Paragraph 11.09,
concerning Change Proposals; Article 12, Claims; Paragraph 13.02.D, final adjustments
resulting from allowances; Paragraph 13.03.D, final adjustments relating to
determination of quantities for Unit Price Work; and similar provisions.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 47 of 69
Page 63 of 214
B. If Contractor refuses to sign a Change Order that is required to be signed under
Paragraph 11.02.A, it shall be deemed to be of full force and effect, as if fully signed.
11.03 Work Change Directives
A. A Work Change Directive shall not change the Contract Price or the Contract Times but is
evidence that the parties expect that the modification ordered or documented by a Work
Change Directive will be incorporated in a subsequently issued Change Order, following
negotiations by the parties as to the Work Change Directive’s effect, if any, on the Contract
Price and Contract Times; or, if negotiations are unsuccessful, by a determination under the
Contract Documents governing adjustments, expressly including Paragraph 11.07 regarding
change of Contract Price.
B. If Owner has issued a Work Change Directive and:
1. Contractor believes that an adjustment in Contract Times or Contract Price is necessary,
then Contractor shall submit any Change Proposal seeking such an adjustment no later
than 14 days after the completion of the Work set out in the Work Change Directive.
2. Owner believes that an adjustment in Contract Times or Contract Price is necessary, then
Owner shall submit any Claim seeking such an adjustment no later than 60 days after
issuance of the Work Change Directive.
11.04 Field Orders
A. Owner may authorize changes in the Work if the changes do not involve an adjustment in the
Contract Price or the Contract Times and are compatible with the design concept of the
completed Project as a functioning whole as indicated by the Contract Documents. Such
changes shall be accomplished by a Field Order and shall be binding on Contractor, which shall
perform the Work involved promptly.
B. If Contractor believes that a Field Order justifies an adjustment in the Contract Price or
Contract Times, then, before proceeding with the Work at issue, Contractor shall submit a
Change Proposal as provided herein.
11.05 Owner-Authorized Changes in the Work
A. Without invalidating the Contract and without notice to any surety, Owner may, at any time
or from time to time, order additions, deletions, or revisions in the Work.
B. Such changes in the Work may be accomplished by a Change Order, if Owner and Contractor
have agreed as to the effect, if any, of the changes on Contract Times or Contract Price; or by
a Work Change Directive. Upon receipt of any such document, Contractor shall promptly
proceed with the Work involved; or, in the case of a deletion in the Work, promptly cease
construction activities with respect to such deleted Work. Added or revised Work shall be
performed under the applicable conditions of the Contract Documents.
C. Nothing in this Paragraph 11.05 obligates Contractor to undertake work that Contractor
reasonably concludes cannot be performed in a manner consistent with Contractor’s safety
obligations under the Contract Documents or Laws and Regulations.
11.06 Unauthorized Changes in the Work
A. Contractor shall not be entitled to an increase in the Contract Price or an extension of the
Contract Times with respect to any work performed that is not required by the Contract
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 48 of 69
Page 64 of 214
Documents, as amended, modified, or supplemented, except in the case of an emergency as
provided in Paragraph 7.15 or in the case of uncovering Work as provided in
Paragraph 14.05.C.2.
11.07 Change of Contract Price
A. The Contract Price may only be changed by a Change Order. Any Change Proposal for an
adjustment in the Contract Price shall comply with the provisions of Paragraph 11.09. Any
Claim for an adjustment of Contract Price shall comply with the provisions of Article 12.
B. An adjustment in the Contract Price shall be determined as follows:
1. Where the Work involved is covered by unit prices contained in the Contract Documents,
then by application of such unit prices to the quantities of the items involved (subject to
the provisions of Paragraph 13.03);
2. Where the Work involved is not covered by unit prices contained in the Contract
Documents, then by a mutually agreed lump sum (which might include an allowance for
overhead and profit not necessarily in accordance with Paragraph 11.07.C.2); or
3. Where the Work involved is not covered by unit prices contained in the Contract
Documents and the parties do not reach mutual agreement to a lump sum, then on the
basis of the Cost of the Work (determined as provided in Paragraph 13.01) plus a
Contractor’s fee for overhead and profit (determined as provided in Paragraph 11.07.C).
C. Contractor’s Fee: When applicable, the Contractor’s fee for overhead and profit shall be
determined as follows:
1. A mutually acceptable fixed fee; or
2. If a fixed fee is not agreed upon, then a fee based on the following percentages of the
various portions of the Cost of the Work:
a. For costs incurred under Paragraphs 13.01.B.1 and 13.01.B.2, the Contractor’s fee
shall be 15 percent of the costs;
b. For costs incurred under Paragraph 13.01.B.3, the Contractor’s fee shall be 5 percent
of the costs;
c. Where one or more tiers of subcontracts are on the basis of Cost of the Work plus a
fee and no fixed fee is agreed upon, the intent of Paragraphs 11.07.C.2.a and
11.07.C.2.b is that the Contractor’s fee shall be based on: (1) a fee of 15 percent of
the costs incurred under Paragraphs 13.01.B.1 and 13.01.B.2 by the Subcontractor
that actually performs the Work, at whatever tier, and (2) with respect to Contractor
itself and to any Subcontractors of a tier higher than that of the Subcontractor that
actually performs the Work, a fee of 5 percent of the amount (fee plus underlying
costs incurred) attributable to the next lower tier Subcontractor; provided, however,
that for any such subcontracted Work the maximum total fee to be paid by Owner
shall be no greater than 27 percent of the costs incurred by the Subcontractor that
actually performs the Work;
d. No fee shall be payable on the basis of costs itemized under Paragraphs 13.01.B.4,
13.01.B.5, or 13.01.C;
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 49 of 69
Page 65 of 214
e. The amount of credit to be allowed by Contractor to Owner for any change that
results in a net decrease in Cost of the Work shall be the amount of the actual net
decrease in Cost of the Work and a deduction of an additional amount equal to
5 percent of such actual net decrease in Cost of the Work; and
f. When both additions and credits are involved in any one change or Change Proposal,
the adjustment in Contractor’s fee shall be computed by determining the sum of the
costs in each of the cost categories in Paragraph 13.01.B (specifically, payroll costs,
Paragraph 13.01.B.1; incorporated materials and equipment costs,
Paragraph 13.01.B.2; Subcontract costs, Paragraph 13.01.B.3; special consultants
costs, Paragraph 13.01.B.4; and other costs, Paragraph 13.01.B.5) and applying to
each such cost category sum the appropriate fee from Paragraphs 11.07.C.2.a
through 11.07.C.2.e, inclusive.
11.08 Change of Contract Times
A. The Contract Times may only be changed by a Change Order. Any Change Proposal for an
adjustment in the Contract Times shall comply with the provisions of Paragraph 11.09. Any
Claim for an adjustment in the Contract Times shall comply with the provisions of Article 12.
B. Delay, disruption, and interference in the Work, and any related changes in Contract Times,
are addressed in and governed by Paragraph 4.05.
11.09 Change Proposals
A. Purpose and Content: Contractor shall submit a Change Proposal to Owner to request an
adjustment in the Contract Times or Contract Price; contest an initial decision by Owner
concerning the requirements of the Contract Documents or relating to the acceptability of
the Work under the Contract Documents; challenge a set-off against payment due; or seek
other relief or changes under the Contract. The Change Proposal shall specify any proposed
change in Contract Times or Contract Price, or other proposed relief, and explain the reason
for the proposed change, with citations to any governing or applicable provisions of the
Contract Documents. Each Change Proposal shall address only one issue, or a set of closely
related issues.
B. Change Proposal Procedures
1. Submittal: Contractor shall submit each Change Proposal to Owner within 14 days after
the start of the event giving rise thereto; otherwise any request by Contractor for an
adjustment in the Contract Times or Contract Price associated with such Change Proposal
shall be deemed waived.
2. Supporting Data: The Contractor shall submit supporting data, including but not limited
to the proposed change in Contract Price or Contract Time (if any), to Owner within
14 days after the submittal of the Change Proposal.
a. Change Proposals based on or related to delay, interruption, or interference shall
comply with the provisions of Paragraphs 4.05.D and 4.05.E.
b. Change proposals related to a change of Contract Price shall include full and detailed
accounts of materials incorporated into the Work and labor and equipment used for
the subject Work.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 50 of 69
Page 66 of 214
The supporting data shall be accompanied by a written statement that the supporting
data are accurate and complete, and that any requested time or price adjustment is the
entire adjustment to which Contractor believes it is entitled as a result of said event.
3. Owner’s Initial Review: If in its discretion Owner concludes that additional supporting data
is needed before conducting a full review and making a decision regarding the Change
Proposal, then Owner may request that Contractor submit such additional supporting
data by a date specified by Owner, prior to Owner beginning its full review of the Change
Proposal.
4. Owner’s Full Review and Action on the Change Proposal: Upon receipt of Contractor’s
supporting data (including any additional data requested by Owner), Owner shall conduct
a full review of each Change Proposal and, within 30 days after such receipt of the
Contractor’s supporting data, either approve the Change Proposal in whole, deny it in
whole, or approve it in part and deny it in part. Such actions shall be in writing, with a
copy provided to Contractor. If Owner does not take action on the Change Proposal within
30 days, then the Change Proposal is deemed denied, thereby commencing the time for
appeal of the denial under Article 12.
5. Binding Decision: Owner’s decision is final and binding upon Contractor, unless Contractor
timely appeals the decision by filing a Claim under Article 12.
C. Post-Completion: Contractor shall not submit any Change Proposals after Final Completion.
11.10 Notification to Surety
A. If the provisions of any bond require notice to be given to a surety of any change affecting the
general scope of the Work or the provisions of the Contract Documents (including but not
limited to Contract Price or Contract Times), the giving of any such notice shall be Contractor’s
responsibility. The amount of each applicable bond shall be adjusted to reflect the effect of
any such change.
ARTICLE 12—CLAIMS
12.01 Claims
A. Claims Process: Claims between Owner and Contractor, including but not limited to the
following, are subject to the process set forth in this article:
1. Appeals by Contractor of Owner’s decisions regarding Change Proposals;
2. Owner demands for adjustments in the Contract Price or Contract Times, or other relief
under the Contract Documents;
3. Subject to the waiver provisions of Paragraph 15.05, any dispute arising after Final
Completion.
B. Submittal of Claim: The party submitting a Claim shall deliver it directly to the other party to
the Contract promptly (but in no event later than 30 days) after the start of the event giving
rise thereto; in the case of appeals regarding Change Proposals within 14 days after the
decision under appeal. The responsibility to substantiate a Claim rests with the party making
the Claim. In the case of a Claim by Contractor seeking an increase in the Contract Times or
Contract Price, Contractor’s Contractor shall certify that the Claim is made in good faith, that
the supporting data are accurate and complete, and that to the best of Contractor’s
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 51 of 69
Page 67 of 214
knowledge and belief the amount of time or money requested accurately reflects the full
amount to which Contractor is entitled. Claims by Contractor seeking an increase in the
Contract Times or Contract Price that are not made within the time limits set forth in this
Paragraph 12.01.B shall be deemed waived.
C. Review and Resolution: The party receiving a Claim shall review it thoroughly, giving full
consideration to its merits. The two parties shall seek to resolve the Claim through the
exchange of information and direct negotiations. The parties may extend the time for
resolving the Claim by mutual agreement. All actions taken on a Claim shall be stated in
writing and submitted to the other party.
D. Mediation
1. At any time after initiation of a Claim, Owner and Contractor may mutually agree to
mediation of the underlying dispute. The agreement to mediate shall stay the Claim
submittal and response process.
2. If Owner and Contractor agree to mediation, then after 60 days from such agreement,
either Owner or Contractor may unilaterally terminate the mediation process, and the
Claim submittal and decision process shall resume as of the date of the termination. If the
mediation proceeds but is unsuccessful in resolving the dispute, the Claim submittal and
decision process shall resume as of the date of the conclusion of the mediation, as
determined by the mediator.
3. Owner and Contractor shall each pay one-half of the mediator’s fees and costs, unless
otherwise agreed.
E. Partial Approval: If Owner approves a Claim by Contractor in part and denies it in part, such
action shall be final and binding unless within 30 days after such action Contractor invokes
the procedure set forth in Article 17 for final resolution of disputes.
F. Denial of Claim: If efforts to resolve a Claim are not successful, the party receiving the Claim
may deny it by giving written notice of denial to the other party. If the receiving party does
not take action on the Claim within 90 days after the written notice of denial, then the Claim
is deemed denied. A denial of the Claim shall be final and binding unless within 30 days after
the denial the other party invokes the procedure set forth in Article 17 for the final resolution
of disputes.
G. Final and Binding Results: If the parties reach a mutual agreement regarding a Claim, whether
through approval of the Claim, direct negotiations, mediation, or otherwise; or if a Claim is
approved in part and denied in part, or denied in full, and such actions become final and
binding; then the results of the agreement or action on the Claim shall be incorporated in a
Change Order or other written document to the extent they affect the Contract, including the
Work, the Contract Times, or the Contract Price.
ARTICLE 13—COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK
13.01 Cost of the Work
A. Purposes for Determination of Cost of the Work: As used in the Contract Documents, the term
Cost of the Work means the sum of all costs necessary for the proper performance of the
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 52 of 69
Page 68 of 214
Work at issue, as further defined in this Paragraph 13.01. The provisions of this
Paragraph 13.01 are used for two distinct purposes:
1. To determine Cost of the Work when Cost of the Work is a component of the Contract
Price, under cost-plus-fee, time-and-materials, or other cost-based terms; or
2. When needed to determine the value of a Change Order, Change Proposal, Claim, set-off,
or other adjustment in Contract Price. When the value of any such adjustment is
determined on the basis of Cost of the Work, Contractor is entitled only to those
additional or incremental costs required because of the change in the Work or because
of the event giving rise to the adjustment.
B. Costs Included: Except as otherwise agreed to in writing by Owner, costs included in the Cost
of the Work shall be in amounts no higher than those commonly incurred in the locality of the
Project, shall not include any of the costs itemized in Paragraph 13.01.C, and shall include only
the following items:
1. Payroll costs for employees in the direct employ of Contractor in the performance of the
Work under schedules of job classifications agreed upon by Owner and Contractor in
advance of the subject Work. Such employees include superintendents, foremen, safety
managers, safety representatives, and other personnel employed full time on the Work.
Payroll costs for employees not employed full time on the Work shall be apportioned on
the basis of their time spent on the Work. Payroll costs include salaries and wages plus
the cost of fringe benefits, which include social security contributions, unemployment,
excise, and payroll taxes, workers’ compensation, health and retirement benefits, sick
leave, and vacation and holiday pay applicable thereto. The expenses of performing Work
outside of regular working hours, on Saturday, Sunday, or legal holidays, shall be included
in the costs included in this Paragraph 13.01.B.1 to the extent authorized by Owner.
2. Cost of all materials and equipment furnished and incorporated in the Work, including
but not limited to costs of transportation and storage thereof, and Suppliers’ field services
required in connection therewith. All cash discounts accrue to Contractor unless Owner
deposits funds with Contractor with which to make payments to which the discounts
apply, in which case the cash discounts shall accrue to Owner. Contractor may not keep
any cash discounts unless it has provided Owner seven days’ prior written notice thereof
and the opportunity to deposit funds with Contractor with which to make payments to
which the discounts apply. All trade discounts, rebates, and refunds and returns from sale
of surplus materials and equipment shall accrue to Owner, and Contractor shall make
provisions so that they can be obtained.
3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors.
If required by Owner, Contractor shall obtain competitive bids from subcontractors
acceptable to Owner and Contractor and shall deliver such bids to Owner, which shall
then determine which bids, if any, will be acceptable. If any subcontract provides that the
Subcontractor is to be paid on the basis of Cost of the Work plus a fee, the Subcontractor’s
Cost of the Work and fee shall be determined in the same manner as Contractor’s Cost of
the Work and fee as provided in this Paragraph 13.01.
4. Costs of special consultants (including but not limited to engineers, architects, testing
laboratories, surveyors, attorneys, and accountants) employed or retained for services
specifically related to the Work.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 53 of 69
Page 69 of 214
5. Other costs consisting of the following:
a. The proportion of necessary transportation, travel, and subsistence expenses of
Contractor’s employees incurred in discharge of duties connected with the Work.
b. Cost, including transportation and maintenance, of all materials, supplies, equipment,
machinery, appliances, office, and temporary facilities at the Site, that are consumed
in the performance of the Work, and cost, less market value, of such items used but
not consumed that remain the property of Contractor.
1) In establishing included costs for materials such as scaffolding, plating, or
sheeting, consideration shall be given to the actual or the estimated life of the
material for use on other projects; or rental rates may be established on the basis
of purchase or salvage value of such items, whichever is less. Contractor shall not
be eligible for compensation for such items in an amount that exceeds the
purchase cost of such item.
c. Construction Equipment Rental
1) Rentals of all construction equipment and machinery, and the parts thereof, in
accordance with rental agreements approved by Owner as to price (including any
surcharge or special rates applicable to overtime use of the construction
equipment or machinery), and the costs of transportation, loading, unloading,
assembly, dismantling, and removal thereof. All such costs shall be in accordance
with the terms of said rental agreements. The rental of any such equipment,
machinery, or parts shall cease when the use thereof is no longer necessary for
the Work.
2) Costs for equipment and machinery owned by Contractor or a Contractor-related
entity shall be paid at a rate shown for such equipment in the equipment rental
rate book specified in the Contract Documents or, in the absence of such a book,
at rates no higher than standard rates paid in Williamson County, Tennessee. An
hourly rate shall be computed by dividing the monthly rates by 176. These
computed rates shall include all operating costs.
3) With respect to Work that is the result of a Change Order, Change Proposal,
Claim, set-off, or other adjustment in Contract Price (“changed Work”), included
costs shall be based on the time the equipment or machinery is in use on the
changed Work and the costs of transportation, loading, unloading, assembly,
dismantling, and removal when directly attributable to the changed Work. The
cost of any such equipment or machinery, or parts thereof, shall cease to accrue
when the use thereof is no longer necessary for the changed Work.
d. Sales, consumer, use, and other similar taxes related to the Work, and for which
Contractor is responsible, as imposed by Laws and Regulations.
e. Deposits lost for causes other than negligence of any of the Contractor Parties, and
royalty payments and fees for permits and licenses.
f. Losses and damages (and related expenses) caused by damage to the Work, not
compensated by insurance or otherwise, sustained by Contractor in connection with
the performance of the Work (except losses and damages within the deductible
amounts of builder’s risk or other property insurance established in accordance with
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 54 of 69
Page 70 of 214
Paragraph 6.04), provided such losses and damages have resulted from causes other
than the negligence of any of the Contractor Parties. Such losses include settlements
made with the written consent and approval of Owner. No such losses, damages, and
expenses shall be included in the Cost of the Work for the purpose of determining
Contractor’s fee.
g. The cost of utilities, fuel, and sanitary facilities at the Site.
h. Minor expenses such as communication service at the Site, express and courier
services, and similar petty cash items in connection with the Work.
i. The costs of premiums for all bonds and insurance that Contractor is required by the
Contract Documents to purchase and maintain.
C. Costs Excluded: The term Cost of the Work does not include any of the following items:
1. Payroll costs and other compensation of Contractor’s officers, executives, principals,
general managers, engineers, architects, estimators, attorneys, auditors, accountants,
purchasing and contracting agents, expediters, timekeepers, clerks, and other personnel
employed by Contractor, whether at the Site or in Contractor’s principal or branch office
in connection with the Work, who are not specifically included in the agreed upon
schedule of job classifications referred to in Paragraph 13.01.B.1 or specifically covered
by Paragraph 13.01.B.4. The payroll costs and other compensation excluded here are to
be considered administrative costs covered by the Contractor’s fee.
2. The cost of purchasing, renting, or furnishing small tools and hand tools.
3. Expenses of Contractor’s principal and branch offices other than Contractor’s office at the
Site.
4. Any part of Contractor’s capital expenses, including interest on Contractor’s capital
employed for the Work and charges against Contractor for delinquent payments.
5. Costs due to the negligence or breach of contract of any of the Contractor Parties,
including but not limited to, the correction of defective Work, disposal of materials or
equipment wrongly supplied, and making good any damage to property.
6. Expenses incurred in preparing and advancing or defending Claims.
7. Other overhead or general expense costs of any kind and the costs of any item not
specifically and expressly included in Paragraph 13.01.B.
D. Contractor’s Fee
1. When the Work as a whole is performed on the basis of cost-plus-a-fee, then:
a. Contractor’s fee for the Work set forth in the Contract Documents as of the Effective
Date of the Contract shall be determined as set forth in the Agreement (or the
applicable Work Order).
b. for any Work covered by a Change Order, Change Proposal, Claim, set-off, or other
adjustment in Contract Price on the basis of Cost of the Work, Contractor’s fee shall
be determined as follows:
1) When the fee for the Work as a whole is a percentage of the Cost of the Work,
the fee shall automatically adjust as the Cost of the Work changes.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 55 of 69
Page 71 of 214
2) When the fee for the Work as a whole is a fixed fee, the fee for any additions or
deletions shall be determined in accordance with Paragraph 11.07.C.2.
2. When the Work as a whole is performed on the basis of a stipulated sum, or any other
basis other than cost-plus-a-fee, then Contractor’s fee for any Work covered by a Change
Order, Change Proposal, Claim, set-off, or other adjustment in Contract Price on the basis
of Cost of the Work shall be determined in accordance with Paragraph 11.07.C.2.
E. Documentation and Audit: Whenever the Cost of the Work for any purpose is to be
determined pursuant to this Article 13, Contractor and pertinent Subcontractors shall
establish and maintain records of the costs in accordance with generally accepted accounting
practices. Subject to prior written notice, Owner shall be afforded reasonable access, during
normal business hours, to all Contractor’s accounts, records, books, correspondence,
instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost
of the Work and Contractor’s fee. Contractor shall preserve all such documents for a period
of five years after Final Completion. Pertinent Subcontractors shall afford such access to
Owner, and preserve such documents, to the same extent required of Contractor.
13.02 Allowances
A. It is understood that Contractor has included in the Contract Price all allowances so named in
the Contract Documents and shall cause the Work so covered to be performed for no more
than such sums and by persons or entities acceptable to Owner.
B. Cash Allowances: Contractor agrees that:
1. the cash allowances include the cost to Contractor (less any applicable trade discounts)
of materials and equipment required by the allowances to be delivered at the Site, and
all applicable taxes; and
2. Contractor’s costs for unloading and handling on the Site, labor, installation, overhead,
profit, and other expenses contemplated for the cash allowances have been included in
the Contract Price and not in the allowances, and no demand for additional payment for
any of the foregoing shall be valid.
C. Owner’s Contingency Allowance: Contractor agrees that an Owner’s contingency allowance,
if any, is for the sole use of Owner to cover unanticipated costs.
D. Prior to Final Completion, an appropriate Change Order shall be issued to reflect actual
amounts due Contractor for Work covered by allowances, and the Contract Price shall be
correspondingly adjusted.
E. Contractor shall not exceed any allowance amount set forth in the Contract Documents, and
shall not be entitled to payment for any such excess amounts, without Owner’s prior written
approval.
13 .03 Unit Price Work
A. Where the Contract Documents provide that all or part of the Work is to be Unit Price Work,
initially the Contract Price shall be deemed to include for all Unit Price Work an amount equal
to the sum of the unit price for each separately identified item of Unit Price Work times the
estimated quantity of each item as indicated in the Agreement (or the applicable Work Order).
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 56 of 69
Page 72 of 214
B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for
the purpose of comparison of Bids and determining an initial Contract Price. Payments to
Contractor for Unit Price Work shall be based on actual quantities.
C. Each unit price shall be deemed to include an amount considered by Contractor to be
adequate to cover Contractor’s overhead and profit for each separately identified item.
D. Owner shall determine the actual quantities and classifications of Unit Price Work performed
by Contractor. Owner shall review with Contractor the Owner’s preliminary determinations
on such matters before rendering a written decision thereon. Owner’s written decision
thereon shall be final and binding upon Contractor, and the final adjustment of Contract Price
shall be set forth in a Change Order, subject to the provisions of the following paragraph.
E. Adjustments in Unit Price
1. Contractor or Owner shall be entitled to an adjustment in the unit price with respect to
an item of Unit Price Work if:
a. the quantity of the item of Unit Price Work performed by Contractor differs materially
and significantly from the estimated quantity of such item indicated in the Agreement
(or the applicable Work Order); and
b. Contractor’s unit costs to perform the item of Unit Price Work have changed
materially and significantly as a result of the quantity change.
2. The adjustment in unit price shall account for and be coordinated with any related
changes in quantities of other items of Work, and in Contractor’s costs to perform such
other Work, such that the resulting overall change in Contract Price is equitable to Owner
and Contractor.
3. Adjusted unit prices shall apply to all units of that item.
ARTICLE 14—TESTS AND INSPECTIONS; CORRECTION, REMOVAL, OR ACCEPTANCE OF DEFECTIVE WORK
14 .01 Access to Work
A. Owner, Engineer, their consultants and other representatives and personnel of Owner,
independent testing laboratories, and authorities having jurisdiction have access to the Site
and the Work at reasonable times for their observation, inspection, and testing. Contractor
shall provide them proper and safe conditions for such access and advise them of Contractor’s
safety procedures and programs so that they can comply with such procedures and programs
as applicable.
14.02 Tests, Inspections, and Approvals
A. Contractor shall give Owner timely notice of readiness of the Work (or specific parts thereof)
for all required inspections and tests, and shall cooperate with inspection and testing
personnel to facilitate required inspections and tests.
B. Owner shall retain and pay for the services of an independent inspector, testing laboratory,
or other qualified individual or entity to perform all inspections and tests expressly required
by the Contract Documents to be furnished and paid for by Owner, except that costs incurred
in connection with tests or inspections of covered Work shall be governed by the provisions
of Paragraph 14.05.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 57 of 69
Page 73 of 214
C. If Laws or Regulations of any public body having jurisdiction require any Work specifically to
be inspected, tested, or approved by an employee or other representative of such public
body, Contractor shall assume full responsibility for arranging and obtaining such inspections,
tests, or approvals, pay all costs in connection therewith, and furnish Owner the required
certificates of inspection or approval.
D. Contractor shall be responsible for arranging, obtaining, and paying for all inspections and
tests required:
1. by the Contract Documents, unless the Contract Documents expressly allocate
responsibility for a specific inspection or test to Owner;
2. to attain Owner’s acceptance of materials or equipment to be incorporated in the Work;
3. by manufacturers of equipment furnished under the Contract Documents;
4. for testing, adjusting, and balancing of mechanical, electrical, and other equipment to be
incorporated into the Work; and
5. for acceptance of materials, mix designs, or equipment submitted for approval prior to
Contractor’s purchase thereof for incorporation in the Work.
Such inspections and tests shall be performed by independent inspectors, testing
laboratories, or other qualified individuals or entities acceptable to Owner.
E. If the Contract Documents require the Work to be approved by Owner or another designated
individual or entity, then Contractor shall assume full responsibility for arranging and
obtaining such approvals.
F. If any Work (or the work of others) that is to be inspected, tested, or approved is covered by
Contractor without written concurrence of Owner, Contractor shall, if requested by Owner,
uncover such Work for observation. Such uncovering shall be at Contractor’s expense unless
Contractor had given Owner timely notice of Contractor’s intention to cover the same and
Owner had not acted with reasonable promptness in response to such notice.
14.03 Defective Work
A. Contractor’s Obligation: It is Contractor’s obligation to assure that the Work is not defective.
B. Owner’s Authority: Owner has the authority to determine whether Work is defective, and to
reject defective Work.
C. Notice of Defects: Reasonably timely written notice of all defective Work of which Owner has
actual knowledge shall be given to Contractor.
D. Correction, or Removal and Replacement: Promptly after receipt of written notice of defective
Work, Contractor shall correct all such defective Work, whether or not fabricated, installed,
or completed, or, if Owner has rejected the defective Work, remove it from the Project and
replace it with Work that is not defective.
E. Preservation of Warranties: When correcting defective Work, Contractor shall take no action
that would void or otherwise impair Owner’s warranty and guarantee, if any, on said Work.
F. Costs and Damages: In addition to its correction, removal, and replacement obligations with
respect to defective Work, Contractor shall pay all claims, costs, losses, and damages arising
out of or relating to defective Work, including but not limited to the cost of the inspection,
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 58 of 69
Page 74 of 214
testing, correction, removal, replacement, or reconstruction of such defective Work, fines
levied against Owner by governmental authorities because the Work is defective, and the
costs of repair or replacement of work of others resulting from defective Work. Prior to Final
Completion, if Owner and Contractor are unable to agree as to the measure of such claims,
costs, losses, and damages resulting from defective Work, then Owner may impose a set-off
against payments due under Article 15.
14.04 Acceptance of Defective Work
A. If, instead of requiring correction or removal and replacement of defective Work, Owner
prefers to accept it, Owner may do so. Contractor shall pay all claims, costs, losses, and
damages attributable to Owner’s evaluation of and determination to accept such defective
Work, and for the diminished value of the Work to the extent not otherwise paid by
Contractor. If any such acceptance occurs prior to Final Completion, the necessary revisions
in the Contract Documents with respect to the Work shall be incorporated in a Change Order.
If the parties are unable to agree as to the decrease in the Contract Price, reflecting the
diminished value of Work so accepted, then Owner may impose a set-off against payments
due under Article 15. If the acceptance of defective Work occurs after Final Completion,
Contractor shall pay an appropriate amount to Owner.
14.05 Uncovering Work
A. Owner has the authority to require additional inspection or testing of the Work, whether or
not the Work is fabricated, installed, or completed.
B. If any Work is covered contrary to the written request of Owner, then Contractor shall, if
requested by Owner, uncover such Work for Owner’s observation, and then replace the
covering, all at Contractor’s expense.
C. If Owner considers it necessary or advisable that covered Work be observed by Owner or
inspected or tested by others, then Contractor, at Owner’s request, shall uncover, expose, or
otherwise make available for observation, inspection, or testing as Owner requires, that
portion of the Work in question, and provide all necessary labor, material, and equipment.
1. If it is found that the uncovered Work is defective, Contractor shall be responsible for all
claims, costs, losses, and damages arising out of or relating to such uncovering, exposure,
observation, inspection, and testing, and of satisfactory replacement or reconstruction
(including but not limited to all costs of repair or replacement of work of others); and
pending Contractor’s full discharge of this responsibility the Owner shall be entitled to
impose a reasonable set-off against payments due under Article 15.
2. If the uncovered Work is not found to be defective, Contractor shall be allowed an
increase in the Contract Price or an extension of the Contract Times directly attributable
to such uncovering, exposure, observation, inspection, testing, replacement, and
reconstruction. If the parties are unable to agree as to the amount or extent thereof, then
Contractor may submit a Change Proposal within 14 days after the determination that the
Work is not defective.
14.06 Owner May Stop the Work
A. If the Work is defective, or Contractor fails to supply sufficient skilled workers or suitable
materials or equipment, or fails to perform the Work in such a way that the completed Work
shall conform to the Contract Documents, then Owner may order Contractor to stop the
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 59 of 69
Page 75 of 214
Work, or any portion thereof, until the cause for such order has been eliminated; however,
this right of Owner to stop the Work shall not give rise to any duty on the part of Owner to
exercise this right for the benefit of any of the Contractor Parties.
14 .07 Owner May Correct Defective Work
A. If Contractor fails within a reasonable time after written notice from Owner to correct
defective Work, or to remove and replace defective Work as required by Owner, then Owner
may, after 7 days’ written notice to Contractor, correct or remedy any such deficiency.
B. In exercising the rights and remedies under this Paragraph 14.07, Owner shall proceed
expeditiously. In connection with such corrective or remedial action, Owner may exclude
Contractor from all or part of the Site, take possession of all or part of the Work and suspend
Contractor’s services related thereto, and incorporate in the Work all materials and
equipment stored at the Site or for which Owner has paid Contractor but which are stored
elsewhere. Contractor shall allow Owner, Owner’s representatives, agents and employees,
Owner’s other contractors, and Engineer and Engineer’s consultants access to the Site to
enable Owner to exercise the rights and remedies under this paragraph.
C. All claims, costs, losses, and damages incurred or sustained by Owner in exercising the rights
and remedies under this Paragraph 14.07 shall be charged against Contractor as set-offs
against payments due under Article 15. Such claims, costs, losses and damages shall include
but not be limited to all costs of repair, or replacement of work of others destroyed or
damaged by correction, removal, or replacement of Contractor’s defective Work.
D. Contractor shall not be allowed an extension of the Contract Times because of any delay in
the performance of the Work attributable to the exercise by Owner of Owner’s rights and
remedies under this Paragraph 14.07.
ARTICLE 15—PAYMENTS TO CONTRACTOR; SET-OFFS; COMPLETION; CORRECTION PERIOD
15 .01 Payments
A. Basis for Payments: Owner shall issue Contractor a Work Order to perform services as
described in the Contract. To receive payment for services, Contractor must invoice Owner
and provide a copy of the corresponding executed Work Order. Owner will make invoice
payments upon presentation, and payments will be considered past due at net 30.
B. Work Order Invoices:
1. Not more often than once a month, Contractor shall submit to Owner for review a Work
Order Invoice filled out and signed by Contractor covering the Work completed as of the
date ofthe Invoice and accompanied by such supporting documentation as is required by
the Contract Documents.
2. If payment is requested on the basis of materials and equipment not incorporated in the
Work but delivered and suitably stored at the Site or at another location agreed to in
writing, the Application for Payment shall also be accompanied by: (a) a bill of sale,
invoice, copies of subcontract or purchase order payments, or other documentation
establishing full payment by Contractor for the materials and equipment; (b) at Owner’s
request, documentation warranting that Owner has received the materials and
equipment free and clear of all Liens; and (c) evidence that the materials and equipment
are covered by appropriate property insurance, a warehouse bond, or other
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 60 of 69
Page 76 of 214
arrangements to protect Owner’s interest therein, all of which shall be satisfactory to
Owner.
3. Beginning with the second Application for Payment, each Application shall include an
affidavit of Contractor, acceptable to Owner, stating that all previous progress payments
received by Contractor have been applied to discharge Contractor’s legitimate obligations
associated with prior Applications for Payment.
C. Review of Work Order Invoice
1. Owner may, after receipt of each Work Order Invoice, including each resubmittal, return
the Invoice to Contractor indicating in writing any reasons for refusing the Invoice in
whole or in part. In such case, Contractor shall make the necessary corrections and
resubmit the Application.
2. Contractor’s Work Order Invoice for Payment shall constitute a representation by
Contractor to Owner that to the best of Contractor’s knowledge, information and belief:
a. the Work has progressed to the point indicated;
b. the quality of the Work is generally in accordance with the Contract Documents; and
c. the conditions precedent to Contractor’s being entitled to such payment appear to
have been fulfilled.
3. By approving any Work Order Invoice for Payment Owner shall not be deemed to have
represented that:
a. inspections made to check the quality or the quantity of the Work as it has been
performed have been exhaustive, extended to every aspect of the Work in progress,
or involved detailed inspections of the Work; or
b. there are not other matters or issues between the parties that might entitle Owner
to withhold payment to Contractor.
4. Owner may reject, in whole or in part, an Work Order Invoice if necessary in Owner’s
opinion to protect Owner from loss because:
a. the Work is defective, requiring correction or replacement;
b. the Contract Price has been reduced by Change Orders;
c. Owner has been required to correct defective Work in accordance with
Paragraph 14.07, or has accepted defective Work pursuant to Paragraph 14.04;
d. Owner has been required to remove, remediate, or otherwise address a Hazardous
Environmental Condition for which Contractor is responsible; or
e. Owner has actual knowledge of the occurrence of any of the events that would
constitute a default by Contractor.
D. Payment Becomes Due
1. Thirty days after Owner’s approval of the Work Order Invoice, the amount approved by
Owner (subject to any Owner set-offs and Owner’s rights to withhold payment under this
Paragraph 15.01) shall become due, and when due shall be paid by Owner to Contractor.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 61 of 69
Page 77 of 214
E. Reductions in Payment by Owner
1. In addition to any reductions in payment by Owner under Paragraph 15.01.C, Owner is
entitled to impose a set-off against payment, and withhold payment in whole or in part,
based on any of the following:
a. Claims have been made against Owner based on Contractor’s conduct in the
performance or furnishing of the Work, or Owner has incurred costs, losses, or
damages resulting from Contractor’s conduct in the performance or furnishing of the
Work, including but not limited to claims, costs, losses, or damages from workplace
injuries, adjacent property damage, non-compliance with Laws and Regulations, or
patent infringement;
b. Contractor has failed to take reasonable and customary measures to avoid damage,
delay, disruption, and interference with other work at or adjacent to the Site;
c. Contractor has failed to provide and maintain required bonds or insurance;
d. Owner has been required to remove, remediate, or otherwise address a Hazardous
Environmental Condition for which Contractor is responsible;
e. Owner has incurred extra charges or engineering costs related to Submittal reviews,
evaluations of proposed substitutes, tests and inspections, or return visits to
manufacturing or assembly facilities;
f. The Work is defective, requiring correction or replacement;
g. Owner has been required to correct defective Work in accordance with
Paragraph 14.07, or has accepted defective Work pursuant to Paragraph 14.04;
h. The Contract Price has been reduced by Change Orders;
i. An event has occurred that would constitute a default by Contractor and therefore
justify a termination of the Contract for cause;
j. Liquidated or other damages have accrued as a result of Contractor’s failure to
achieve Milestones, Substantial Completion, or Final Completion of the Work;
k. Liens have been asserted or filed in connection with the Work, except where
Contractor has delivered a specific bond satisfactory to Owner to secure the
satisfaction and discharge of such Liens; or
l. Other items entitle Owner to impose a set-off against the amount requested.
2. If Owner withholds or imposes any set-off against payment, Owner shall give Contractor
prompt written notice stating the reasons for such action and the specific amount of the
reduction, and promptly pay Contractor any amount remaining after deduction of the
amount so withheld. Owner shall promptly pay Contractor the amount so withheld, or
any adjustment thereto agreed to by Owner and Contractor, if Contractor remedies the
reasons for such action. The reduction imposed shall be binding on Contractor unless it
duly submits a Change Proposal contesting the reduction.
3. Upon a subsequent determination that Owner’s refusal of payment was not justified, the
amount wrongfully withheld shall be treated as an amount due as determined by
Paragraph 15.01.D.1.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 62 of 69
Page 78 of 214
F. If Owner reasonably believes it is necessary, Owner may, at its sole option, issue joint checks
to Contractor and any Subcontractor or Supplier, or issue direct payments to any
Subcontractor or Supplier, to whom Contractor has failed to make payment for Work properly
performed or material or equipment suitably delivered.
15.02 Contractor’s Warranty of Title
A. Contractor warrants and guarantees that title to all Work, materials, and equipment
performed and furnished under the Contract shall pass to Owner free and clear of (1) all Liens
and other title defects, and (2) all patent, licensing, copyright, or royalty obligations, upon
payment by Owner.
15 .03 Final Inspection
A. Upon written notice from Contractor that it considers the entire Work or an agreed portion
thereof to be finally complete, Owner shall promptly make a final inspection with Contractor
and shall notify Contractor in writing of all particulars in which this inspection reveals that the
Work, or agreed portion thereof, is incomplete or defective. Contractor shall immediately
take such measures as are necessary to complete such Work and remedy such deficiencies.
15 .04 Final Completion and Payment
A. Application for Payment
1. After Contractor has, in the opinion of Owner, satisfactorily completed all corrections and
other Work identified during the final inspection and has delivered, in accordance with
the Contract Documents, all maintenance and operating instructions, schedules,
guarantees, bonds, certificates or other evidence of insurance, certificates of inspection,
annotated record documents (as provided in Paragraph 7.12), and other documents,
Contractor may make application for final payment.
2. The final Work Order Invoice shall be accompanied (except as previously delivered) by:
a. all documentation called for in, and in the format required by, the Contract
Documents, including but not limited to as-built drawings and specifications reflecting
all changes to, and the final condition of, the Work as constructed;
b. consent of all sureties to final payment;
c. satisfactory evidence that all title issues have been resolved such that title to all Work,
materials, and equipment has passed to Owner free and clear of any Liens or other
title defects, or will so pass upon final payment.
d. a list of all duly pending Change Proposals and Claims; and
e. complete and legally effective releases or waivers (satisfactory to Owner) of all Lien
rights arising out of the Work, and of Liens filed in connection with the Work.
3. In lieu of the releases or waivers of Liens specified in Paragraph 15.04.A.2, if approved by
Owner, Contractor may furnish receipts or releases in full and an affidavit of Contractor
that: (a) the releases and receipts include all labor, services, material, and equipment for
which a Lien could be filed; and (b) all payrolls, material and equipment bills, and other
indebtedness connected with the Work for which Owner might in any way be responsible,
or that might in any way result in Liens or other burdens on Owner's property, have been
paid or otherwise satisfied. If any Subcontractor or Supplier fails to furnish such a release
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 63 of 69
Page 79 of 214
or receipt in full, Contractor may furnish a bond or other collateral satisfactory to Owner
to indemnify Owner against any Lien, or Owner at its option may issue joint checks
payable to Contractor and specified Subcontractors and Suppliers. In any event, to the full
extent permitted by Laws and Regulations, Contractor shall defend (at Owner’s option in
its sole discretion), indemnify and hold harmless the Owner Parties from and against all
claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals and all court or arbitration or
other dispute resolution costs) arising out of or relating to any Liens and claims asserted
or filed because of the Work.
B. Owner’s Review of Final Work Order Invoice : If, on the basis of Owner’s observation of the
Work during construction and final inspection, and Owner’s review of the final Application for
Payment and accompanying documentation as required by the Contract Documents, Owner
is satisfied that the Work has been finally completed and Contractor’s other obligations under
the Contract have been fulfilled, final payment shall become due under Paragraph 15.04.D
Such determination shall account for any set-offs against payment that are necessary in
Owner’s opinion to protect Owner from loss for the reasons stated in Paragraphs 15.01.C and
15.01.E with respect to progress payments. Otherwise, Owner shall return the Application for
Payment to Contractor, indicating in writing the reasons for refusing to make final payment,
in which case Contractor shall make the necessary corrections and resubmit the Application
for Payment.
C. Completion of Work: The Work is finally complete (subject to surviving obligations) when final
payment is due from Owner to Contractor as established under this Paragraph 15.04.
D. Final Payment Becomes Due: Upon Final Completion, Owner shall set off against the amount
for final payment any further sum to which Owner is entitled, including but not limited to set
offs for liquidated damages and set-offs allowed under Paragraphs 15.01.C and 15.01.E with
respect to progress payments. Owner shall pay the resulting balance due to Contractor within
30 days after Owner’s receipt and approval of the final Application for Payment from
Contractor.
15.05 Waiver of Claims
A. By making final payment, Owner waives its claim or right to liquidated damages or other
damages for late completion by Contractor, except as set forth in an outstanding Claim,
appeal under the provisions of Article 17, set-off, or express reservation of rights by Owner.
Owner reserves all other claims or rights after final payment.
B. The acceptance of final payment by Contractor shall constitute a waiver by Contractor of all
claims and rights against Owner other than those pending matters that have been duly
submitted as a Claim or appealed under the provisions of Article 17.
15 .06 Correction Period
A. If, within one year after the date of Final Completion (or such longer period of time prescribed
by the Contract Documents or the terms of any applicable warranty or guarantee required by
or contained in the Contract Documents), Owner gives Contractor written notice that any
Work has been found to be defective, or that Contractor’s repair of any damages to the Site
or adjacent areas has been found to be defective, then after receipt of such notice of defect
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 64 of 69
Page 80 of 214
Contractor shall promptly, without cost to Owner and in accordance with Owner’s written
instructions:
1. correct the defective repairs to the Site or such adjacent areas;
2. correct such defective Work;
3. remove the defective Work from the Project and replace it with Work that is not
defective, if the defective Work has been rejected by Owner, and
4. satisfactorily correct or repair or remove and replace any damage to other Work, to the
work of others, or to other land or areas resulting from the corrective measures.
B. Owner shall give Contractor reasonably timely notice of any such defect after Owner discovers
it. If such notice is given after the end of the correction period, the notice shall be deemed a
notice of defective Work under Paragraph 7.17.B.
C. If, after receipt of a notice of defect, Contractor does not promptly comply with the Owner’s
written instructions, or in an emergency where delay would cause serious risk of loss or
damage, Owner may have the defective Work corrected or repaired or may have the rejected
Work removed and replaced. Contractor shall pay all costs, losses, and damages (including
but not limited to all fees and charges of engineers, architects, attorneys, and other
professionals and all court or arbitration or other dispute resolution costs) arising out of or
relating to such correction or repair or such removal and replacement (including but not
limited to all costs of repair or replacement of work of others). Contractor’s failure to pay such
costs, losses, and damages within 10 days after invoice from Owner shall be deemed the start
of an event giving rise to a Claim under Paragraph 12.01.B, such that any related Claim shall
be brought within 30 days after the failure to pay.
D. In special circumstances where a particular item of equipment is placed in continuous service
before Substantial Completion of all the Work, the correction period for that item may start
to run from an earlier date if so provided in the Specifications.
E. Where defective Work (and damage to other Work resulting therefrom) has been corrected
or removed and replaced under this paragraph, the correction period hereunder with respect
to such Work shall be extended for an additional period of one year after such correction or
removal and replacement has been satisfactorily completed.
F. Contractor’s obligations under this paragraph are in addition to all other obligations and
warranties. The provisions of this paragraph are not to be construed as a substitute for, or a
waiver of, the provisions of any applicable warranty or statute of limitation or repose.
ARTICLE 16—SUSPENSION OF WORK AND TERMINATION
16 .01 Owner May Suspend Work
A. At any time and without cause, Owner may suspend the Work or any portion thereof for a
period of not more than 90 consecutive days by written notice to Contractor. Such notice shall
fix the date on which Work will be resumed. Contractor shall resume the Work on the date so
fixed. Contractor shall be entitled to an extension of the Contract Times directly attributable
to any such suspension, to the extent not caused by any of the Contractor Parties. Any Change
Proposal seeking such adjustment shall be submitted no later than 14 days after the date fixed
for resumption of Work.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 65 of 69
Page 81 of 214
16.02 Contractor Default; Owner May Terminate the Contract for Cause
A. The occurrence of any one or more of the following events shall constitute a default by
Contractor and entitle Owner to all rights and remedies available to it under the Contract and
Laws and Regulations, including but not limited to Owner’s termination of the Contract for
cause:
1. Contractor’s failure to perform the Work in accordance with the Contract Documents
(including but not limited to failure to supply sufficient skilled workers or suitable
materials or equipment, or failure to adhere to the Progress Schedule);
2. Failure of Contractor to perform or otherwise to comply with a material term of the
Contract Documents;
3. Contractor’s disregard or violation of Laws or Regulations; or
4. Contractor’s disregard of the authority of Owner or Engineer.
B. If one or more of the events identified in Paragraph 16.02.A occurs, then after giving
Contractor (and any surety) 10 days’ written notice that Owner is considering a declaration
that Contractor is in default and termination of the Contract, Owner may proceed to:
1. declare Contractor to be in default, and give Contractor (and any surety) written notice
that the Contract is terminated;
2. enforce the rights available to Owner under any applicable performance bond; and/or
3. exercise or pursue any other rights and remedies available to Owner under the Contract
and Laws and Regulations.
C. Subject to the terms and operation of any applicable performance bond, if Owner has
terminated the Contract for cause, Owner may exclude Contractor from the Site, take
possession of the Work, incorporate in the Work all materials and equipment stored at the
Site or for which Owner has paid Contractor but that are stored elsewhere, and complete the
Work as Owner deems expedient.
D. Owner may not proceed with termination of the Contract under Paragraph 16.02.B if
Contractor, within 7 days after receipt of notice of intent to terminate, begins to correct its
failure to perform and diligently cures such failure.
E. If Owner proceeds as provided in Paragraph 16.02.B, Contractor shall not be entitled to
receive any further payment until the Work is completed. If the unpaid balance of the
Contract Price exceeds the cost to complete the Work, including but not limited to all related
claims, costs, losses, and damages (including but not limited to all fees and charges of
engineers, architects, attorneys, and other professionals) sustained by Owner, such excess
shall be paid to Contractor. If the cost to complete the Work, including but not limited to such
related claims, costs, losses, and damages exceeds such unpaid balance, Contractor shall pay
the difference to Owner. When exercising any rights or remedies under this paragraph, Owner
shall not be required to obtain the lowest price for the Work performed.
F. Where the Contract has been so terminated by Owner, the termination shall not affect any
rights or remedies of Owner against Contractor then existing or that thereafter accrue, or any
rights or remedies of Owner against Contractor or any surety under any payment bond or
performance bond. Any retention or payment of money due Contractor by Owner shall not
release Contractor from liability.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 66 of 69
Page 82 of 214
16.03 Owner May Terminate the Contract for Convenience
A. Upon 7 days’ written notice to Contractor, Owner may, without cause and without prejudice
to any other right or remedy of Owner, terminate the Contract. In such case, Contractor shall
be paid for (without duplication of any items):
1. completed and acceptable Work performed in accordance with the Contract Documents
prior to the effective date of termination, including fair and reasonable sums for overhead
and profit on such Work;
2. expenses sustained prior to the effective date of termination in performing services and
furnishing labor, materials, or equipment as required by the Contract Documents in
connection with uncompleted Work, plus fair and reasonable sums for overhead and
profit on such expenses; and
3. other reasonable expenses directly attributable to termination, including costs incurred
to prepare a termination for convenience cost proposal.
B. Contractor shall not be paid for any loss of anticipated profits or revenue, post-termination
overhead costs, or other economic loss arising out of or resulting from such termination.
16 .04 Contractor May Stop Work or Terminate the Contract
A. If, through no act or fault of Contractor, (1) the Work is suspended for more than 90
consecutive days by Owner or under an order of court or other public authority, or (2) Owner
fails to act on any Application for Payment within 60 days after it is submitted, or (3) Owner
fails for 30 days to pay Contractor any sum finally determined to be due, then Contractor may,
upon 7 days’ written notice to Owner, and provided Owner does not remedy such suspension
or failure within that time, terminate the Contract and recover from Owner payment on the
same terms as provided in Paragraph 16.03.
B. In lieu of terminating the Contract and without prejudice to any other right or remedy, if
Owner has failed to act on an Application for Payment within 60 days after it is submitted, or
Owner has failed for 30 days to pay Contractor any sum finally determined to be due,
Contractor may, 7 days after written notice to Owner, stop the Work until payment is made
of all such amounts due Contractor. The provisions of this paragraph are not intended to
preclude Contractor from submitting a Change Proposal for an adjustment in the Contract
directly attributable to Contractor’s stopping the Work as permitted by this paragraph.
ARTICLE 17—FINAL RESOLUTION OF DISPUTES
17 .01 Methods and Procedures
A. Disputes Subject to Final Resolution: The following disputed matters are subject to final
resolution under the provisions of this article:
1. A timely appeal of an approval in part and denial in part of a Claim, or of a denial in full,
pursuant to Article 12; and
2. Disputes between Owner and Contractor concerning the Work, or obligations under the
Contract Documents, that arise after Final Completion.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 67 of 69
Page 83 of 214
B. Final Resolution of Disputes: For any dispute subject to resolution under this article, Owner or
Contractor may:
1. Before bringing any action in court pertaining to any Claim, dispute or other matter in
question arising out of or related to the Contract Documents or the breach thereof, the
claimant shall first provide notice of the Claim, dispute or other matter in question to the
other party to this Contract in writing and make a specific demand for settlement of said
Claim, dispute or matter. If the other party fails to agree to an acceptable resolution to
said Claim, dispute or matter, or offer a specific counter-proposal thereto within five days
after the receipt of such notice, or the claimant fails to accept any counter-proposal from
the other party within five days after receipt thereof, either party shall be free to submit
the Claim, dispute or other matter to litigation in accordance with Paragraph 17.01.B.2.
2. Any Claim, dispute, or other matter in question arising out of or related to the Contract
or the Project shall be litigated in the Tennessee Judicial Circuit Court in and for
Williamson, County, Tennessee, and the prevailing party to any such litigation shall be
entitled to an award of all reasonable attorneys’ and experts’ fees, expenses and court
costs incurred by such prevailing party against the non-prevailing party, including in
connection with any appeals.
ARTICLE 18—MISCELLANEOUS
18 .01 Giving Notice
A. Whenever any provision of the Contract requires the giving of written notice to Owner or
Contractor, it shall be deemed to have been validly given only if delivered:
1. in person, by a commercial courier service or otherwise, to the recipient’s place of
business;
2. by registered or certified mail, postage prepaid, to the recipient’s place of business; or
3. by e-mail to the recipient, if also sent by one of the methods in Paragraph 18.01.A.1 or .2.
18.02 Computation of Times
A. When any period of time is referred to in the Contract by days, it shall be computed to exclude
the first and include the last day of such period. If the last day of any such period falls on a
Saturday or Sunday or legal holiday, such day shall be omitted from the computation.
18.03 Cumulative Remedies
A. Except as otherwise specifically provided in the Contract Documents, the duties and
obligations imposed by the Contract Documents, and the rights and remedies available
thereunder, are in addition to, and are not to be construed in any way as a limitation of, any
rights and remedies available to any or all of them that are otherwise imposed or available by
Laws or Regulations, by warranty or guarantee, or by other provisions of the Contract. The
provisions of this paragraph shall be as effective as if repeated specifically in the Contract
Documents in connection with each particular duty, obligation, right, and remedy to which
they apply.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 68 of 69
Page 84 of 214
18.04 Limitation of Damages
A. With respect to any and all Change Proposals, Claims, disputes subject to final resolution, and
other matters at issue, neither the Owner Parties nor Engineer, nor any of their consultants
or subcontractors, shall be liable to Contractor for any claims, costs, losses, or damages
sustained by Contractor on or in connection with any other project or anticipated project.
18 .05 No Waiver
A. A party’s non-enforcement of any provision shall not constitute a waiver of that provision,
nor shall it affect the enforceability of that provision or of the remainder of this Contract.
18 .06 Survival of Obligations
A. All representations, indemnifications, warranties, and guarantees made in, required by, or
given in accordance with the Contract, as well as all other obligations in the Contract that
logically should survive Final Completion or earlier termination of the Contract, shall survive
Final Completion or earlier termination of the Contract.
18.07 Controlling Law
A. This Contract is to be governed by the laws of the State of Tennessee.
18 .08 Assignment of Contract
A. Unless expressly agreed to elsewhere in the Contract, no assignment by a party to this
Contract of any rights under or interests in the Contract shall be binding on the other party
without the written consent of the party sought to be bound; and, specifically but without
limitation, money that becomes due and money that is due may not be assigned without such
consent (except to the extent that the effect of this restriction is limited by law), and unless
specifically stated to the contrary in any written consent to an assignment, no assignment
shall release or discharge the assignor from any duty or responsibility under the Contract.
18 .09 Successors and Assigns
A. Owner and Contractor each binds itself, its successors and assigns to the other party hereto
and its successors and assigns in respect to all covenants, agreements, and obligations
contained in the Contract Documents.
18.10 Headings
A. Article and paragraph headings are inserted for convenience only and do not constitute parts
of these General Conditions.
Modified - EJCDC® C-700, Standard General Conditions of the Construction Contract.
Copyright© 2018 National Society of Professional Engineers, American Council of Engineering Companies,
and American Society of Civil Engineers. All rights reserved.
Page 69 of 69
Page 85 of 214
City of Franklin Page 1 of 2
City of Franklin
109 3rd Ave S.
Franklin, TN 37064
(615) 791-3217
File #: 26-01094
DATE: 9/24/2026
TO: Capital Investment Committee
FROM: Paul Holzen, Director of Engineering
SUBJECT:
Consideration Of Resolution 2026-82, A Resolution Declaring Mooney Alley As Surplus Property
PURPOSE:
The purpose of this memorandum is to provide information to the Franklin Board of Mayor and
Aldermen (BOMA) concerning Resolution 2026-82.
BACKGROUND/STAFF COMMENTS:
Resolution 2026-82 requests approval from the Board of Mayor and Aldermen (BOMA) to declare a
portion of right-of-way adjacent to Mooney Alley as surplus property.
City staff has reviewed this segment of right-of-way and determined that it no longer serves a
practical or feasible purpose for public use. The adjoining parcels are as follows:
Map 078K, Parcel 12.00 – 1227 Adams Street
Map 078K, Parcel 8.00 – 305 Stewart Street
Map 078K, Parcel 7.02 – 315 Stewart Street
Map 078K, Parcel 6.00 – 210 Lewisburg Avenue
The intent of the resolution is to convey the surplus right-of-way to the adjoining property owners as
conceptually shown. If an adjacent owner declines to accept the property, it will then be offered to the
next adjoining property owner.
FINANCIAL IMPACT:
There is no financial impact to The City.
RECOMMENDATION:
Page 86 of 214
Staff recommends that Resolution 2026-82 be recommended to the Board of Mayor and Aldermen
for approval.
Page 87 of 214
RESOLUTION 2026-82
A R
ESOLUTION DECLARING MOONEY ALLEY AS SURPLUS PROPERTY
WH
EREAS, the Board of Mayor and Aldermen (BOMA) by approving this resolution, are
determining that the existing property adjacent to Mooney Alley as shown on Exhibit A is no longer
necessary, suitable, and desirable as public right-of-way; and
WH
EREAS, because this right-of-way as shown in Exhibit A is no longer needed, the City now
desires to declare the right -of-way surplus property in order to sell or dispose of the property to the
adjoining property owners of Map 078K (305 Stewart Street) Parcel No. 12.00 (1227 Adams Street), Map
078K Parcel 8.00, Map 078K Parcel 7.02 (315 Stewart Street), and Map 078K Parcel 6.00 (210 Lewisburg
Ave); and
WH
EREAS, the existing right- of-way adjacent to Mooney Alley would be considered a non -
buildable lot and staff has determined the value to be less than $75,0000; and
WH
EREAS, each property owner will take ownership of the portion of Mooney Alley adjoining
their property as conceptually shown in Exhibit A; and
WH
EREAS, if all neighboring property owners do not agree to the above terms, the City
Administrator and City Attorney, or their designee, are authorized to proceed with deeding the property
to the neighboring property owners agreeing to receive the surplus right-of-way; and
WH
EREAS, the City will realize additional tax benefits from this property being returned to the tax
roll with such transfer of ownership of the property; and
WH
EREAS, Municipal Code Title 5, Chapter 8, Section 5-802 allows for the BOMA to sell or dispose
of right-of-way by negotiated contract or by other means that will adequately protect the public interest
when the value does not exceed $75,000.
NOW,
THEREFORE, BE IT RESOLVED BY THE BOARD OF MAYOR AND ALDERMEN OF THE CITY OF
FRANKLIN, TENNESSEE, AS FOLLOWS:
Se
ction I. The right-of-way adjacent to Mooney Alley as shown in attached exhibit A is hereby
declared surplus property.
Sec
tion II. The Board hereby authorizes the City Administrator and City Attorney to execute all
documents, easements, and deeds necessary to complete the right-of-way abandonment.
IT
IS SO RESOLVED AND DONE on this ____ day of _______________, 2026.
AT
TEST: CITY OF FRANKLIN, TENNESSEE:
By
:_____________________________ By:___________________________
Cayce Anderson Dr. Ken Moore
City Recorder Mayor
1
Law Dept approved 09.17.26
Page 88 of 214
Approved as to Form:
By: _____________________________
William E. Squires
Deputy City Attorney
2
Law Dept approved 09.17.26
Page 89 of 214
Memorandum of Understanding
Subject: Acceptance or Waiver of Ownership of Mooney Alley upon City Abandonment
Date: July 30, 2026
We, the undersigned property owners of parcels adjacent to Mooney Alley in Franklin, TN, hereby
indicate our preferences regarding ownership of the alley upon its official abandonment of any
ownership the City of Franklin may or may not own.
By signing this memorandum, we acknowledge our decision below and any related responsibilities as
determined by applicable legal or surveying procedures upon the City’s abandonment of Mooney Alley.
The abandonment shall be conceptually based on Exhibit A and final survey, legal description and exhibit
will need to be provided to the City of Franklin. I further understand this abandonment is subject to
approval by the Board of Mayor and Alderman.
Property Owners and Addresses:
1. Josh Jones
1227 Adams St.
X We wish to take ownership of the portion of Mooney Alley adjoining our property.
(Signature) Date: 30 July 2026
2. William T. Powell and Dale Powell
210 Lewisburg Ave.
☐ We wish to take ownership of the portion of Mooney Alley adjoining our property.
☐ We do not wish to take ownership and have no objections to the City quitclaiming our
portion of Mooney Alley to an adjacent property owner.
3.
_______ (Signature) Date:
Kyle R. Circle and Alissa M. Circle
re) Date:
305 Stewart St.
☐ We wish to take ownership of the portion of Mooney Alley adjoining our property.
☐ We do not wish to take ownership and have no objections to the City quitclaiming our
portion of Mooney Alley to an adjacent property owner.
_____________________________ (Signature) Date: __________
_____________________________ (Signature) Date: __________
See Next Page
Exhibit A
Page 90 of 214
4. Timothy J Liv Trust Beaulieu
315 Stewarts
Zwish to/akeOwnership of a portion of Mooney Alley adjoining my property.
of
have no objections to the City quitclaiming my portion
y owner.nt propo an
(Signature) Date:
'V
Exhibit A
Page 91 of 214
Exhibit A
Page 92 of 214
City of Franklin Page 1 of 2
City of Franklin
109 3rd Ave S.
Franklin, TN 37064
(615) 791-3217
File #: 26-01123
DATE: 9/24/2026
TO: Capital Investment Committee
FROM: Paul Holzen, Director of Engineering
Jimmy Wiseman, Asst. Director of Engineering
SUBJECT:
Consideration Of Resolution 2026-84, A Resolution To Approve The On-Call Contract Professional
Services Agreements With Multiple Qualified Consultants For: Site Improvement Surety
Reconciliation Services
PURPOSE:
The purpose of this memorandum is to provide information to the Franklin Board of Mayor and
Aldermen (BOMA) concerning Resolution 2026-84.
BACKGROUND/STAFF COMMENTS:
The City requires developers to provide performance sureties to guarantee completion of required
site improvements associated with development projects. In certain circumstances, a developer may
fail to complete the required improvements, requiring the City to utilize the performance surety to
complete the outstanding work. The Engineering Department is establishing an on-call contracting
process to assist the City with completing these improvements and reconciling the associated
sureties.
On July 28, 2026, the City issued a Request for Qualifications (RFQ) for Site Improvement Surety
Reconciliation Services. Responses were received and reviewed by City staff based on the criteria
established in the RFQ.
Resolution 2026-84 approves the standard contract template that will be used for qualified
contractors providing Site Improvement Surety Reconciliation Services and establishes the process
for issuing individual Work Orders under those agreements. Work will be assigned on an as-needed
basis. For each assignment, the contractor will provide a task proposal identifying the scope of work,
cost, basis for the cost, and schedule for completion. The City Engineer will issue individual Work
Orders, which will be approved by the City Administrator prior to commencement of the work.
Establishing these on-call contracts will provide the City with an efficient mechanism to address
outstanding site improvements when a developer fails to complete improvements secured by a
Page 93 of 214
performance surety. Rather than bringing an individual contract before the Board each time the City
needs to complete outstanding improvements, the City will be able to issue a Work Order under the
approved contract terms. Each Work Order will establish a not-to-exceed amount and will remain
subject to the terms and fee schedule of the applicable agreement.
Staff recommends approval of Resolution 2026-84 and the standard Professional Services
Agreement template for Site Improvement Surety Reconciliation Services.
FINANCIAL IMPACT:
Work performed under these agreements shall be funded exclusively by the developer’s posted
performance surety. If the required improvements exceed the surety amount, the City will pause all
work and request Board of Mayor and Aldermen approval for any additional funds before proceeding.
RECOMMENDATION:
Staff recommends that Resolution 2026-84 be recommended to the Board of Mayor and Aldermen
for approval.
Page 94 of 214
RESOLUTION 2026-84
A R
ESOLUTION TO APPROVE THE ON-CALL CONTRACT PROFESSIONAL SERVICES AGREEMENTS
WITH MULTIPLE QUALIFIED CONSULTANTS FOR SITE IMPROVEMENT SURETY RECONCILIATION
SERVICES
WH
EREAS, the Board of Mayor and Aldermen of the City of Franklin, Tennessee desires to move
toward the effective and efficient administration of City business; and
WH
EREAS, on July 28, 2026, the City posted a Request for Qualifications (“RFQ”) on the City’s
website to solicit interest form individuals or consultants to render: Site Improvement Surety
Reconciliation Services (collectively referred to herein as the “Services”); and
WH
EREAS, said Services would be provided for a term of three (3) years through a Professional
Services Agreement (“PSA”), awarded to one (1) or more consultants; and
WH
EREAS, by the posted deadline of August 25, 2026, the City received a total of three (3)
responses to its RFQ for Services; and
WH
EREAS, City staff carefully reviewed and rated each consultant’s submittal against the
criteria provided within the RFQ document to which the consultant responded; and
WH
EREAS, City staff recommends approval of the following PSAs with the listed consultants for
the specifically requested services as listed in the table below:
Site Improvement Surety Reconciliation Services
COF Contract No. Consultant Name
2026-0174 Civil Constructors, LLC
2026-0382 Tennessee Stormwater Company
2026-0395 Evergreen Infrastructure
WH
EREAS, to facilitate reconciling outstanding site improvements that are secured by
performance sureties when a developer has not completed required site improvements, the BOMA finds
it in the City’s best interest to authorize the City Administrator to issue Work Orders associated with the
approved term PSAs; and
WH
EREAS, funds have been allocated and are available in the Operating – Engineer Budget to
cover the costs associated with the contract; and
NO
W, THEREFORE, BE IT RESOLVED BY THE BOARD OF MAYOR AND ALDERMEN OF THE CITY OF
FRANKLIN, TENNESSEE, AS FOLLOWS:
Sec
tion 1. Approval of the consultant selections and On-Call Professional Service Agreements with the
consultants for the requested services as listed in the table below:
1
Law Dept approved (2) 09.16.26
Page 95 of 214
Site Improvement Surety Reconciliation Services
COF Contract No. Consultant Name
2026-0174 Civil Constructors, LLC
2026-0382 Tennessee Stormwater Company
2026-0395 Evergreen Infrastructure
Section 2. The City Engineer shall be authorized to issue Work Orders associated with the BOMA’s
approved On-Call PSAs as listed in Section 1 above in the pursuit of facilitating City business more
effectively and efficiently.
Section 3. The City Administrator shall be authorized to approve and execute Work Orders associated
with the BOMA’s approved On-Call PSAs as listed in Section 1 above. Each consultant shall be paid on a
monthly basis for work performed based on the Fee Schedule as contained in their respective PSA in the
Not to Exceed Amount for Individual Work Orders. Individual Work Orders shall be issued by the City
Engineer, approved by the City Administrator and shall be subject to all terms of their respective PSA.
Section 4. This resolution shall take effect immediately upon its passage and approval.
IT IS SO RESOLVED AND DONE on this ____ day of _______________, 20__.
ATTEST: CITY OF FRANKLIN, TENNESSEE:
By:_____________________________ By:___________________________
Cayce Anderson Dr. Ken Moore
City Recorder Mayor
Approved as to Form:
By: _____________________________
Ronda D. Webb
Assistant City Attorney
2
Law Dept approved (2) 09.16.26
Page 96 of 214
CITY OF FRANKLIN, TENNESSEE
PROFESSIONAL SERVICES AGREEMENT
COF Contract No. 2026-0382
TH
IS PROFESSIONAL SERVICES AGREEMENT (“Agreement”) is by and
between the City of Franklin, Tennessee, hereinafter referenced as City, and TENNESSEE
STORMWATER COMPANY hereinafter referenced as Contractor, who mutually agree
as follows:
DECL
ARATIONS. C ity desires to retain C onsultant to provide engineering, related
technical, and other services in connection with City’s project hereinafter referenced as
Project. The Project is described as follows:
TE
RM CONTRACT: SITE IMPROVEMENT SURETY RECONCILIATION
SERVICES
1. SC
OPE OF SERVICES . Contractor shall provide Site Improvement Surety
Reconciliation Services for the Project in accordance with the Scope of Services
(Services) as found in Attachment A which shall be considered as an integral
part hereof.
2. Cont
ractor shall submit as a part of Attachment A an individual F ee Schedule
and a Completion Schedule for the P roject based on the detailed Scope of
Services.
3. In e
vent of a conflict between this A greement and the attached document(s),
this Agreement shall supersede conflicting terms and conditions.
4. Cont
ractor shall be paid on a monthly basis for work performed based on the
Site Improvements completed, inspected, and approved as further described in
Attachment A. Individual work orders shall be issued by the City Engineer and
approved by the City Administrator and shall be subject to all terms of this
Agreement.
5. Th
is Agreement shall terminate no later than three (3) years from the date of
execution.
Th
e Board of Mayor and Aldermen Approved this Agreement on the _____
day of _____________ 20___.
1
Law Dept approved (2) 09.16.26
Docusign Envelope ID: 67E522A3-4FEB-8366-80F3-C36E5889F10E
Page 97 of 214
TERMS AND CONDITIONS FOR PROFESSIONAL SERVICES
ARTICLE 1. SERVICES. Consultant will:
1.1 Act for City in a professional manner, using that degree of care and skill ordinarily
exercised by and consistent with standards of competent consultants using the
standards in the industry:
1.2 Consider all reports to be confidential and distribute copies of the same only to
those persons specifically designated by the City.
1.3 Perform all services under the general direction of a senior professional employee,
licensed and/or registered in the State of Tennessee, when appropriate.
1.4 Designate, in writing, the sole Project representative to coordinate with City the
Services to be provided, including all contact information.
1.5 Unless provided for in the Project Scope of Services (Attachment A), Consultant
shall perform all Services with his own forces (employees). Should sub-consultants
be proposed to be used in the Project, a listing of said sub-consultants with Services
to be performed shall be provided. After approval of this Agreement, no substitute
for sub-consultants shall be allowed unless approved by City.
1.6 Retain pertinent records relating to the services performed for a period of seven (7)
years following the completion of the work; during this period the records shall be
available for review by City at all reasonable times.
ARTICLE 2. CITY’S RESPONSIBILITIES. City, or its authorized representative, will:
2.1 Provide Consultant with all information regarding the P roject, which is available
to, or reasonably obtainable by, the City.
2.2 Furnish right-of-entry onto the Project site for Consultant’s necessary field studies
and surveys. Consultant will endeavor to restore the site to its original condition
and shall remain solely liable for all damages, costs and expenses, including
reasonable attorneys’ fees, for failure to make such restoration.
2.3 Designate, in writing, the sole P roject representative to coordinate with and direct
the Consultant, including all contact information.
2.4 Guarantee to Consultant that it has the legal capacity to enter into this contract and
that sufficient monies are available to fund Consultant’s compensation.
ARTICLE 3. GENERAL CONDITIONS.
3.1 Consultant , by the performance of services covered hereunder, does not in any way
assume, abridge or abrogate any of those duties, responsibilities or authorities
customarily vested in other professionals or agencies participating in the Project.
3.2 Consultant shall be responsible for the acts or omissions of any party involved in
concurrent or subsequent phases of the Project acting upon written instruction
issued by the Consultant.
3.3 Neither C ity nor C onsultant may assign or transfer its duties or i nterest in this
Agreement without written consent of the other party.
2
Law Dept approved (2) 09.16.26
Docusign Envelope ID: 67E522A3-4FEB-8366-80F3-C36E5889F10E
Page 98 of 214
3.4 ALLOCATION OF RISK AND LIABILITY; GENERAL . C onsidering the
potential liabilities that may exist during the performance of the services of this
Agreement, the relative benefits and risks of the P roject, and the C onsultant’s fee
for the services rendered, and in consideration of the promises contained in this
Agreement, the City and the Consultant agree to allocate and limit such liabilities
in accordance with this Article.
3.5 INDEMNIFICATION. Consultant agrees to indemnify and hold C ity harmless
from and against legal liability for all judgments, losses, damages, and expenses to
the extent such judgments, losses, damages, or expenses are caused by Consultant’s
negligent act, error or omission in the performance of the services of this
Agreement. In the event judgments, losses, damages, or expenses are caused by the
joint or concurrent negligence of Consultant and City, they shall be borne by each
party in proportion to its own negligence.
3.5.1 SURVIVAL. T he terms and conditions of this paragraph shall
survive completion of this services agreement.
3.6 LIMITATIONS OF RESPONSIBILITY. Consultant shall not be responsible for
(a) construction means, methods, techniques, sequences, procedures, or safety
precautions and programs in connection with the P roject unless specifically
undertaken in Attachment A, Scope of Services ; (b) the failure of any contractor,
subcontractor, Consultant , or other P roject participant, not under contract to
Consultant, to fulfill contractual responsibilities to City or to comply with federal,
state, or local laws, regulations, and codes; or (c) procuring permits, certificates,
and licenses required for any construction unless such procurement responsibilities
are specifically assigned to Consultant in Attachment A, Scope of Services.
ARTICLE 4. TERMINATION BY THE CITY. The City may terminate this Agreement
in accordance with the following terms and conditions:
4.1 Termination for Convenience. The City may, when in the interests of the City,
terminate performance under this Agreement with the Consultant, in whole or in
part, for the convenience of the City. The City shall give written notice of such
termination to the Consultant specifying when termination becomes effective. The
Consultant shall incur no further obligations in connection with the work so
terminated, other than warranties and guarantees for completed work and installed
equipment, and the Consultant shall stop work when such termination becomes
effective. The Consultant shall also terminate outstanding orders and subcontracts
for the affected work. The Consultant shall settle the liabilities and claims arising
out of the termination of subcontracts and orders. The City may direct the
Consultant to assign the Consultant’s right, title and interest under termination
orders or subcontracts to the City or its designee. The Consultant shall transfer title
and deliver to the City such completed or partially completed work and materials,
equipment, parts, fixtures, information and Contract rights as the Consultant has in
its possession or control. When terminated for convenience, the Consultant shall be
compensated as follows:
(1) The Consultant shall submit a termination claim to the City
specifying the amounts due because of the termination for
3
Law Dept approved (2) 09.16.26
Docusign Envelope ID: 67E522A3-4FEB-8366-80F3-C36E5889F10E
Page 99 of 214
convenience together with costs, pricing or other data
required by the City. If the Consultant fails to file a
termination claim within one (1) year from the effective date
of termination, the City shall pay the Consultant the amount
the City deems the Consultant is due.
(2) The City and the Consultant may agree to the compensation,
if any, due to the Consultant hereunder.
(3) Absent agreement to the amount due to the Consultant, the
City shall pay the Consultant the following amounts:
(a) Contract costs for labor, materials, equipment and
other services accepted under this Agreement;
(b) Reasonable costs incurred in preparing to perform
and in performing the terminated portion of the work,
and in terminating the Consultant's performance,
plus a fair and reasonable allowance for direct job
site overhead and earned profit thereon (such profi t
shall not include anticipated profit or consequential
damages); provided however, that if it reasonably
appears that the Consultant would have not profited
or would have sustained a loss if the entire
Agreement would have been completed, no profit
shall be allowed or included and the amount of
compensation shall be reduced to reflect the
anticipated rate of loss, if any;
The total sum to be paid the Consultant under this Section shall not exceed
the total Agreement Price, as properly adjusted, reduced by the amount of
payments otherwise made, and shall in no event include duplication of
payment.
4.2 Termination for Cause. If the Consultant does not perform the work, or any part
thereof, in a timely manner, supply adequate labor, supervisory personnel or proper
equipment or materials, or if it fails to timely discharge its obligations for labor,
equipment and materials, or proceeds to disobey applicable law, or otherwise
commits a violation of a material provision of this Agreement, then the City, in
addition to any other rights it may have against the Consultant or others, may
terminate the performance of the Consultant, in whole or in part at the City’s sole
option, and assume possession of the Project Plans and materials and may complete
the work.
In such case, the Consultant shall not be paid further until the work is complete.
After Completion has been achieved, if any portion of the Contract Price, as it may
be modified hereunder, remains after the cost to the City of completing the work,
including all costs and expenses of every nature incurred, has been deducted by the
City, such remainder shall belong to the Consultant. Otherwise, the Consultant shall
4
Law Dept approved (2) 09.16.26
Docusign Envelope ID: 67E522A3-4FEB-8366-80F3-C36E5889F10E
Page 100 of 214
pay and make whole the City for such cost. This obligation for payment shall
survive the termination of the Agreement.
In the event the employment of the Consultant is terminated by the City for cause
pursuant to this Section and it is subsequently determined by a Court of competent
jurisdiction that such termination was without cause, such termination shall
thereupon be deemed a Termination for Convenience under this Section and the
provisions of Section 4.1 shall apply.
4.3 Termination for Non-Appropriation. The City may also terminate this Agreement,
in whole or in part, for non-appropriation of sufficient funds to complete or partially
complete the Project, regardless of the source of such funds, and such termination
shall be on the terms of Section 4.1.
4.4 The City's rights under this Section shall be in addition to those contained elsewhere
herein or provided by law.
ARTICLE 5. SCOPE OF SERVICES. Consultant shall provide the S ervices as
described in Attachment A, Scope of Services.
5.1 By mutual agreement, this Agreement and scope can be amended by the parties.
The scope and fee for any additional ta
Text truncated. Open the original for the full document.