City of Franklin
Meeting Agenda
Development Service Advisory
Commission
109 3rd Ave S
Franklin, TN 37064
(615) 791-3217
Tuesday, September 1, 2026
8:00 AM
Eastern Flank Event Facility
City of Franklin Page 1
1368 Eastern Flank Circle
Franklin, TN 37064
CALL TO ORDER
CITIZEN COMMENTS (Open for citizens to be heard on any issue or concern, including those related to
items on the agenda. Please submit a Speaker Card at the beginning of the meeting if you would like to
address the Board/Commission. If you would like to speak on an agenda item, the Chair will hold your
comment until the public comment period associated with the item. As provided by law,
Boards/Commissions shall make no decisions or consideration of action of citizen comments for items not
on the agenda, except to refer the matter to the City Administrator/Staff for administrative consideration,
or to a schedule the matter for consideration at a later date. Those addressing the Board/Commission are
requested to come to the microphone and identify themselves by name and address for the official record.
The Chair may restrict the period for public comment, including the length of the public comment period,
the number of individuals who can speak and the length of time each individual may speak. When time
allows, the standard individual public comment time is two minutes.)
APPROVAL OF MINUTES
1. Consideration Of Approval Of The June 2nd, 2026 DSAC Minutes
NEW BUSINESS
2. Zoning Ordinance Update: Public Chapter 1044 And Development Review Changes
Sponsors: Amy Diaz-Barriga
3. Mid-Year Development Activity Report
Sponsors: Katherine Harelson
OTHER BUSINESS
ADJOURN
Anyone needing accommodations due to disabilities please contact the ADA Coordinator at 615-791-3277 at least 24 hours prior to
the meeting.
Page 1 of 35
City of Franklin
109 3rd Ave S
Franklin, TN 37064
(615) 791-3217
Meeting Minutes
Development Service Advisory
Commission
Tuesday, June 2, 2026 8:00 AM Eastern Flank Event Facility
CALL TO ORDER
Chair Ben Crenshaw called the meeting to order at 8:00am
Commissioners Present: Chair Ben Crenshaw, Vice Chair Mary McGowan, Michael Walkers Young, Scotty Bernick,
Dana Kose, Claudia ZuaZua, Mike Hathaway, Daniel Jones, Alderman Matt Brown
Commissioners Absent: Kate McDonald, Paige Parham
Staff Present: Amy Diaz-Barriga, Bill Squires, Jimmy Wiseman, Emily Wright, Joel Aguilera, Andrew Orr, Alex Brown,
Tauri Evans, Stephen Ortero, Katherine Harelson
CITIZEN COMMENTS (Open for citizens to be heard on any issue or concern, including those related to
items on the agenda. Please submit a Speaker Card at the beginning of the meeting if you would like to
address the Board/Commission. If you would like to speak on an agenda item, the Chair will hold your
comment until the public comment period associated with the item. As provided by law,
Boards/Commissions shall make no decisions or consideration of action of citizen comments for items not
on the agenda, except to refer the matter to the City Administrator/Staff for administrative consideration, or
to a schedule the matter for consideration at a later date. Those addressing the Board/Commission are
requested to come to the microphone and identify themselves by name and address for the official record.
The Chair may restrict the period for public comment, including the length of the public comment period,
the number of individuals who can speak and the length of time each individual may speak. When time
allows, the standard individual public comment time is two minutes.)
No Citizen Comments.
ANNOUNCEMENTS
Tom Marsh, Director of Building and Neighborhood Services, announced that his last week with the city will
be in September. He stated that the recruitment process for his replacement has begun and that the position
has been posted internally and externally.
APPROVAL OF MINUTES
1. Consideration Of Approval Of Minutes
Sponsors: Chair Ben Crenshaw
NEW BUSINESS
2. Proposed Plan Review Fee Updates
Sponsors: Alex Brown
The fee discussion followed previous feedback from the commission and was recently presented to BOMA at a work
session.
The proposed fee updates include:
• Increasing the non-residential plan review base fee from $50 to $250, while keeping the existing escalating
factor.
• Adding a $50 fire protection plan review fee.
• Adding a $100 residential plan review fee for new construction only.
Page 2 of 35
• The residential fee would not apply to small homeowner projects, affordable housing, workforce housing, or
projects under 2,000 square feet.
Budget staff reviewed the estimated cost of staff time for plan review services. The analysis considered staff from
Building and Neighborhood Services, Fire, and Water Management.
The commission discussed whether fees should cover the full cost of service or only offset a portion. Staff explained
that there is no single standard approach and that communities vary widely in how they structure fees.
The commission also discussed the potential benefit of improving plan quality at initial submittal and whether internal
process improvements or expanded OneStop services could reduce repeated review cycles.
No formal recommendation was requested. The item was presented for information and feedback. The fee update is
expected to proceed to BOMA for second reading and public comment.
3. Parking Study
Representatives from Walker Consultants presented an overview of the City of Franklin Parking Study. The study
began in April and is expected to be a 12-month process. Initial data collection has been completed, and the team is
currently gathering stakeholder feedback.
The purpose of the study is to evaluate current parking conditions, identify challenges, and develop a long-term
strategy to support Franklin’s continued growth while maintaining a positive downtown experience.
Key discussion points included:
• Approximately 2,200 parking spaces are included in the study area, including on-street and off-street parking.
• The study focuses on the downtown core and surrounding areas experiencing parking spillover.
• Private paid parking lots have increased pressure on public parking assets.
• Members identified parking concerns including availability, signage, accessibility, private paid lot confusion,
employee parking, event parking, and wayfinding.
• Several members noted that locals often know where to park, while visitors may find the system confusing.
• The group discussed the balance between free parking, convenient parking, and available parking.
• It was noted that all three priorities — free, convenient, and available parking — cannot realistically be
maximized at the same time.
• Paid public parking was discussed as a possible future consideration, though no recommendation was made.
• Concerns were raised about how paid City parking could interact with existing private paid lots.
• The consultant noted that Franklin does not appear to have a systemwide parking shortage, but rather a
concentrated parking demand issue in the downtown core.
No formal action was taken. The consultant team will continue its analysis and return with additional findings at
future meetings.
4. State Legislation
Emily Wright Director of Planning and Sustainability provided an overview of recent state legislation affecting
local development review processes.
Public Chapter 140
This legislation becomes effective July 1 and requires local governments to provide justifiable documentation and
rationale for development-related fees over $250.
Emily stated that the City is reviewing all plan review fees and preparing documentation to support the cost basis for
those fees. The information will be made publicly available and subject to annual audit by the State Comptroller.
House Bill 2552
This legislation becomes effective January 1, 2027, and establishes required timelines for plan review, decisions, site
inspections, and performance/maintenance agreement approvals.
Key impacts discussed:
• Initial review and resubmittal timelines may remain mostly the same because Franklin’s current review timelines
are generally shorter than the state-required 30 business days.
• The law includes an overall 60 business day timeline from plan submittal to approval or disapproval.
• The City may only issue two deficiency reports before a plan must be placed on an agenda for decision.
• This could result in more denial recommendations or more conditions of approval if plans are not ready.
Page 3 of 35
• Pre-application review may likely become voluntary rather than mandatory.
• There may be limitations on an applicant’s ability to defer items in order to reset timelines.
• Staff is still reviewing whether boards such as Planning Commission and BOMA will retain the ability to defer
items.
• The law also creates timelines for third-party site inspections, requiring the City to inspect within 10 business
days after receiving a third-party report.
Emily stated that ordinance amendments will be needed before the end of the year. Additional information and flow
charts are expected to be brought back to the commission later in the summer, likely around August.
Decentralized Wastewater Systems
Legislation allowing on-site decentralized wastewater systems to be permitted by the State, even if a local
wastewater utility does not approve them.
It was noted that this could significantly impact the City’s sewer planning, especially in the Urban Growth Boundary. A
decentralized system approved by the State could affect future sewer routing, gravity sewer planning, pump
stations, and force main needs.
No formal action was taken. Staff will continue reviewing the legislative impacts and return with additional updates.
City of Franklin
OTHER BUSINESS
No other business was discussed.
ADJOURN
The meeting adjourned at 9:08 AM.
Chair Date
Page 4 of 35
Page 5 of 35
Development Review
Changes
Required changes to the City of Franklin Review Procedures due to
Public Chapter 1044 and updates to TCA 7-51-2204 and 7-70-
101/102
Page 6 of 35
State Law
made major
changes to
developme
nt
applications
• Development Plans and Site
Plans must be approved or
placed on an agenda within 60
business days
• Limits cities to only two rounds
of review
• If a local government fails to
take action within the
timeframe, the development is
deemed approved
Page 7 of 35
IMPLICATIONS
• Staff will need to track the 60-day timeframe,
and regardless of project status, an action will
need to be taken.
• Staff may be recommending more disapprovals
• FMPC and BOMA may be disapproving more
projects
• Pre-Application submittals will become
voluntary but encouraged
• Completeness checks, permitted by PC1044,
may be used as tool at the beginning of the
process
• Plans will be permitted to submit again as a
new application if it was disapproved
• Cities need to ensure all development plans
and site plans are placed on an agenda, to
avoid them being considered approved
• The City must hold development review to a
tighter timeline
• Applicants have lost the ability to defer midway
through the process to resolve complex issues
• Determining when an application is “submitted”
is critical to review timelines
• Disapproved projects given two deficiency
reports will be refunded 50% of the review fees
• The process may become longer and more
stuttered for complex projects
ADJUSTMENTS
Page 8 of 35
PROCESS CHANGES
Initial Submittal,
Resubmittal, and FMPC
equates to
approximately 33
business days
Some cycles may allow
for a second resubmittal
opportunity, but not all
Staff can deem the
initial submittal
incomplete; 60-day
clock does not start;
new initial submittal
must be submitted
Initial Submittal starts
the 60-day clock
Plan meeting still
required for
Development Plans,
and if not held will
deem initial submittal
incomplete
Pre-App Submittal will
become voluntary, as
to not constitute
“submission” and
60-day clock start
Neighborhood
meetings still required
for Development Plans
, and if not held will
deem initial submittal
incomplete
Page 9 of 35
MOVING FORWARD
• Use the Pre-Application as a tool to gain staff
review without starting the clock
• An “incomplete” determination could be an
advantage for complex projects; will allow for
thorough staff review and comments AND
appropriate time to address required revisions
• Plans should be submitted with the expected
level of detail; poorly drawn plans will lead to
disapprovals
• More information may need to be submitted
prior to the “clock start” to ensure projects can
be recommended for approval within 60 days
(traffic studies, TDEC determinations,
subdivision names, sewer/water availability
determinations, etc.)
• Staff to adjust Zoning Ordinance, FMPC
Bylaws, submittal portal reports, website
publications, and Review Cycle calendars to
adjust to new procedures
Page 10 of 35
State Law
also made
major
changes to
surety
releases
• A developer can submit an
“Independent Inspection”
justifying release of a surety
• The City has a defined period to
time (20/30 days) to reject a
request for surety release if the
improvement is not yet
completed to City standards and
regulations
Page 11 of 35
IMPLICATIONS ADJUSTMENTS
• Staff will adopt a new submittal calendar that
guarantees action within state timeframes
• Staff will provide punchlists for requests for
release made by engineers associated with a
project
• Staff will likely require detailed information in the
Independent Inspection Report
• Staff hopes to put release requests into the online
submittal portal, making tracking easier for staff
and information more transparent for applicants
• Staff will require critical submittals be approved
PRIOR to requesting a release (as-builts/video)
• Staff must perform site inspections slightly
quicker than we do today
• Engineers not associated with the on-site
work throughout the length of the project will
be allowed to request a release of a surety on
behalf of a developer.
• Staff is left guessing at what to expect in an
Independent Inspection because it wasn’t
defined
• If the City does not place a request for
release/reduction on an agenda, it will be
approved for release.
Page 12 of 35
PROCESS CHANGES
Independent
Inspections will NOT
receive this opportunity;
they are either released
or provide a incomplete
report, per State Law
Action requests that
need clean-up before
staff can release now
can do so before a
decision is made;
approximately 2 weeks
There will still be one
day a month where
staff accepts new
requests; independent
inspections, action
requests, and punch-
list resubmittals
Projects that are ready
to release will be acted
upon promptly, without
much adjustments
from current
timeframes
Page 13 of 35
MOVING FORWARD
• The City may require additional submittal
documents with the “independent inspection” to
verify that the work is complete, and it is
appropriate to release the surety
• Staff will continue to look out for the City’s best
interest, verifying ANY action request to
determine that work is indeed complete as
required by our development standards
• It is unknown how many “independent
inspections” the City will receive after January 1
• Depending on their influx, additional staff may
be needed respond to the additional number of
inspections in shortened timeframes
Page 14 of 35
DEVELOPMENTACTIVITYREPORT
BOMA WORK SESSION -
Page 1
Page 15 of 35
O V E R V I E W
Mid-Calendar Year 2026
Survey Response Update
Development Activity from July 1 , 2025 - June 30 , 2026 st th
Permitting Activity
Permit & Impact Fees (Current & Trends)
Housing and Other Notable Developments
Fiscal Year 2026
Development activity from January - June 2026
Permitting Activity
Permit & Impact Fees (Current & Trends)
Housing & Construction Costs
Next Steps
Page 2
Page 16 of 35
CALENDAR YEAR 2026: SIX MONTHS IN...
Page 3
Page 17 of 35
MID-CALENDAR YEAR PERMITTING ACTIVITY
2022 2023 2024 2025 2026
Building Permits 582 495 582 577 517
Trade Permits 2,409 2,065 2,589 2,725 2,390
Fire Permits N/A N/A 153 201 183
Building permit activity through the first half of the calendar year
remained stable, but it has decreased over the last two years
(10% decrease from last year).
Fire permits were introduced in 2023 and implemented fully in
2024. These permits were created to help separate fire
suppression from the building permit so that it is easier for
applicants.
Page 4
Page 18 of 35
Permit Fees: $1,202,154
Road Impact Fees: $3,600,436
Water Impact Fees: $258,216
Sewer Impact Fees: $3,443,973
Facilities Tax: $1,003,490
PERMIT AND IMPACT FEES
MID-CALENDAR YEAR
Road Impact Fees
43%
Facilities Tax
12%
Sewer
Impact Fees
42%
Water Impact Fees
3%
Page 5
Page 19 of 35
R oad Impact F ees F acilities T ax
Sew er Impact F ees W a t er Impact F ees
Calendar Y ear
Fees ($)
CY 20 22 CY 20 23 CY 20 2 4 CY 20 25 CY 20 26
0
1 000000
2000000
3000000
4000000
5000000
6000000
2022 2023 2024 2025 2026
Road Impact
Fees $2,808,719 $1,414,133 $5,078,285 $3,734,603 $3,600,436
Facilities Tax $935,842 $577,976 $1,199,774 $1,172,137 $1,003,490
Sewer Impact
Fees $802,518 $487,948 $3,645,442 $2,583,238 $3,443,973
Water Impact
Fees $60,255 $125,203 $681,943 $865,965 $258,216
MID-CALENDAR YEAR FEE TRENDS
Page 6
Page 20 of 35
Single Family Townhome Multifamily
129 units 13 units 35 units
Residential Non-Residential Total
$142,063,363 $412,308,658 $554,372,021
Construction Values
HOUSING & CONSTRUCTIONCOSTS MID-CALENDAR YEAR
New Dwelling Units Under Construction
Page 7
Page 21 of 35
FISCAL YEAR2026
Page 8
Page 22 of 35
FY26 PERMITTING ACTIVITY
2022 2023 2024 2025 2026
Building Permits 1,092 1,034 1,103 1,223 997
Trade Permits 4,478 4,254 5,098 5,544 4,687
Fire Permits N/A N/A 274 371 382
Other Permits 133 144 150 156 194
Total Permits
Issued 5,703 5,432 6,625 7,294 6,260
Construction activity decreased slightly in FY26 compared to the last five
years.
Many multi-year active projects are continuing construction, and there
are several projects working through the entitlement process.
Development activity remains stable in Franklin.
Page 9
Page 23 of 35
Permit Fees: $2,246,671
Road Impact Fees: $6,222,431
Water Impact Fees: $412,564
Sewer Impact Fees: $5,633,669
Facilities Tax: $1,751,323
FY 26 PERMIT AND
IMPACT FEES
Road Impact Fees
44%
Facilities Tax
13%
Sewer
Impact Fees
40%
Water Impact Fees
3%
Page 10
Page 24 of 35
R oad Impact F ees F acilities T ax
Sew er Impact F ees W a t er Impact F ees
20
1 6
20
1 7
20
18
20
1 9
20
20
20
21
20
22
20
23
20
2
4
20
25
20
26
0
2, 000 , 000
4 , 000 , 000
6 , 000 , 000
8 , 000 , 000
1 0 , 000 , 000
12, 000 , 000
14 , 000 , 000
FY 2016 - FY 2026
Impact Fees
over the
Last Decade
Page 11
Page 25 of 35
Under Construction in FY26
Residential
Single Family: 212 dwelling units started construction in
FY26.
Townhomes: 44 dwelling units started construction in FY26.
Multifamily: 343 dwelling units (3 developments) started
construction in FY26.
Commercial
Notable Developments
New City Hall!
Aureum PUD (Multifamily)
In-N-Out Burger Office Building
In-N-Out Wiki
Commercial Space Added: 328,709 sqft.
Page 12
Page 26 of 35
FY26 HOUSING TRENDS
Single F amily T o wnhomes Multif amily
20
1
6
20
1
7
20
18
20
1
9
20
20
20
21
20
22
20
23
20
2
4
20
25
20
26
0
500
1 000
1500
2000
Fiscal Y ear
# of Dwelling
Units
Page 13
Page 27 of 35
Construction Value Trends (FY2016 - FY2026)
Fiscal Y ear
Construction Value of Permitted Projects
20 1 6 20 1 7 20 18 20 1 9 20 20 20 21 20 22 20 23 20 2 4 20 25 20 26
$0
$200 , 000 , 000
$400 , 000 , 000
$600 , 000 , 000
$800 , 000 , 000
$1 , 000 , 000 , 000
The City of Franklin issued permits
for construction projects that
reached a total value of $891.2
million for Fiscal Year 2026.
The City finished the year with the
second highest total construction
value in a decade.
Page 13
Page 14
Page 28 of 35
DEVELOPMENT SURVEY FOLLOW-UP
Quarterly Update
At the request of the BOMA, Staff will provide an update
at least once a quarter on internal efforts to address
recommendations that came from the last Development
Customer Survey.
Page 15
Page 29 of 35
Total Responses 77
Average Rating 4.78 Stars
QR CODES - MINI SURVEYS Mobile View
The mini surveys went live in early October 2025!
“We build all over Nashville and honestly our experience
w/Franklin is the most efficient and the staff actually care
about the projects that they are working on.” - Anonymous
Responder
“Everyone is always so helpful. Feels like the people working
there actually want to make things easier for the public and
contractors, which is greatly appreciated.” - Anonymous
Responder
“The updated COA application is great!” - Anonymous
Responder Page 16
Page 30 of 35
Page 17
Strategic Planning – The FIT 5
What is the FIT 5?
FIT Five stands for Franklin Indicator Tracking , which all city
departments have defined as the five most important
performance measures that reflect their operational efficiency
and connection with overarching city goals.
FIT Five measures have been established for the FY2027
Budget. This is still a work in progress, and tweaks will be made
throughout the year.
Updates from the Community & Economic Developmet
Program Area will be provided every six months during the
Development Activity Report to ensure transparency on our
key metrics of success.
Page 31 of 35
F I T 5 - E N G I N E E R I N G & T R A F F I C O P E R A T I O N S
Page 18
1 . P e a k - H o u r T r a v e l T i m e I n d e x ( T T I ) o r 1 . 3 o r b e t t e r o n a t l e a s t 8 0 % o f r o a d w a y s e g m e n t s , b a s e d
o n I N R I X D a t a .
2 . A v e r a g e n u m b e r o f p l a n s r e v i e w e d p e r r e v i e w e r .
3 . A v e r a g e n u m b e r o f s t o r m w a t e r i n s p e c t i o n s p e r i n s p e c t o r p e r m o n t h .
4 . P e r c e n t a g e o f c o n s t r u c t i o n p r o j e c t s c o m p l e t e d o n t i m e .
5 . P e r c e n t a g e o f c a p i t a l p r o j e c t s d e l i v e r e d a t o r b e l o w t h e b i d a m o u n t a w a r d e d b y B O M A .
Page 32 of 35
F I T 5 - P L A N N I N G & S U S T A I N A B I L I T Y
1. Staff hours spent annually on the creation and updates of long range plans and special
projects.
2. Staff hours spent annually on research and amendments to the Zoning Ordinance and
subdivision regulations.
3. Average number of current planning reviews per reviewer.
4. Amount (in dollars) of sureties held for the insurance of completed public assets.
5. Average number of historic preservation reviews per plan reviewer.
Page 19
Page 33 of 35
F I T 5 - B U I L D I N G & N E I G H B O R H O O D S E R V I C E S
1 . T i m e f r o m p l a n s u b m i t t a l t o p e r m i t i s s u e d .
2 . A v e r a g e n u m b e r o f r e v i e w c y c l e s p e r p r o j e c t .
3 . N u m b e r o f r e v i e w s p e r r e v i e w e r p e r w e e k .
4 . N u m b e r o f i n s p e c t i o n s ( b u i l d i n g & m u n i c i p a l ) p e r i n s p e c t o r p e r w e e k .
5 . F e e s ( p e r m i t & p l a n r e v i e w ) c o l l e c t e d a s p e r c e n t o f t o t a l d e a r t m e n t b u d g e t .
Page 20
Page 34 of 35
THANK YOU!