Franklin Transit Authority — Agenda Packet
Williamson County · Williamson County · Franklin Transit Authority · meeting of Aug 4, 2026 · Agenda packets
Open the original document More from Williamson County
This document is no longer listed on Williamson County's website. We kept the copy we read.
Text
Extracted automatically from the original. Tables and formatting may not survive; the original document is authoritative.
City of Franklin
Meeting Agenda
Franklin Transit Authority
Mailing Address:
109 3rd Ave S
Franklin, TN 37064
(615) 791-3217
Tuesday, August 4, 2026
4:00 PM
Eastern Flank Event Facility
City of Franklin Page 1
MEETING LOCATION
Eastern Flank Event Facility
1368 Eastern Flank Circle
Notice is hereby given that a meeting of the Franklin Transit Authority will be held on the date and time
listed above. You may call 615.791.3212 for additional information. For accommodations due to disabilities
or other special arrangements, please contact the Human Resources Department at 615.791.3216 at least
24 hours prior to the meeting. Accommodations have been made to ensure that the public is able to view
the meeting. The public may view the meeting by attending in person at the meeting location.
CALL TO ORDER
CITIZEN COMMENTS
APPROVAL OF MINUTES
1. Consideration Of Approval Of Minutes
OLD BUSINESS
NEW BUSINESS
2. Consideration Of Financial Report
3. Consideration Of Grants And Funding Report
4. Consideration Of Transit And VanStar Statistics Report
5. Consideration Of Resources And Opportunities Report
6. Consideration Of Outreach And Marketing Report
7. Consideration Of Contractor Monitor Report
8. Consideration Of Equipment Report
9. Consideration Of Resolution 2026-33 To Adopt The 2026 Transit Master Plan BAI 8-4-26A
10. Acknowledgment Of Amendment to COF Contract No. 2024-0302 BAI 8-4-26B
11. Consideration of Updates to Franklin Transit Authority Transportation Safety Plan BAI 8-4-26C
Page 1 of 126
Board of Mayor & Alderman Meeting Agenda August 4, 2026
12. Consideration of TAM Plan Performance Measures Targets BAI 8-4-26D
13. Consideration of Updated Drug and Alcohol Testing Policy BAI 8-4-26E
14. Acknowledgment of Procurement and Purchasing of Transit Vehicles BAI 8-4-26F
OTHER BUSINESS
15. City Staff Report
16. Report Of TMA President/CEO
17. Chairman's Report
ADJOURN
Anyone needing accommodations due to disabilities please contact the ADA Coordinator at 615-791-3277 at least 24 hours prior to
the meeting.
Page 2 of 126
1
FRANKLIN TRANSIT AUTHORITY
MINUTES OF BOARD MEETING
Tuesday, June 2, 2026; 4:00 P.M.
The Franklin Transit Authority met on Tuesday, June 2, 2026, at 4:00 P.M., at the Eastern Flank
Event Facility in Franklin, TN.
Members Present
Scotty Bernick
Eric McElroy
Deanna Lambert
Doris McMillan
John Schroer
Leya White
Debbie Henry, The TMA Group
Kelly Bair, The TMA Group
Stanton Higgs, The TMA Group
Sharmila Patel, The TMA Group
Max Baker, City of Franklin
Emily Hunter Wright, COF
Bill Squires, City of Franklin
David Chang, City of Franklin
Joel Aguilera, City of Franklin
Andrew Orr, City of Franklin
CALL TO ORDER
Chairman John Schroer welcomed everyone and called the meeting to order. He confirmed a
quorum was present.
CITIZEN COMMENTS
There were no citizen comments
APPROVAL OF MINUTES
There were no questions or comments made regarding the April 2026 Authority minutes. Mr.
Eric McElroy made a motion for approval of the FTA minutes. Ms. Leya White seconded the
motion, and the Authority voted unanimously to approve.
NEW BUSINESS
Moving Agenda Items
Mr. McElroy made a motion to move items 11, 12, and 13 to discuss first. Ms. White
seconded the motion, and the Authority voted unanimously to approve.
Acknowledgment of Franklin Transit Authority Procurement Policy Manual
Ms. Sharmila Patel explained that the Franklin Transit Authority Procurement Policy manual
has been updated utilizing TDOT’s procurement policy template. Ms. White made a motion to
approve adoption of the manual. Mr. Scotty Bernick seconded the motion, and it was approved
unanimously.
Consideration of Continuation of FREE Lunchtime Shuttle Service
At the February meeting, the Authority made the decision to continue the lunchtime shuttle
service through June 30, 2026. Authority members reviewed the passenger numbers provided
in their packets. Chairman Schroer made a motion to extend the lunch shuttle service through
Page 3 of 126
2
December 31, and the Authority would review the data and vote at the December meeting. Ms.
Doris McMillan seconded the motion, and the Authority voted unanimously to approve.
Acknowledgment of Amendment to COF Contract No. 2024-0302
Mr. Max Baker explained that the Authority’s contract with Benesch is set to end on July 1,
2026. An amendment will extend the project schedule through October 6, 2026, to
accommodate the adoption schedule. Ms. Deanna Lambert made a motion to approve
adoption of the manual. Mr. McElroy seconded the motion, and it was approved unanimously.
Consideration of Financial Report
Dr. Kelly Bair shared the FY26 financial report through February 28—transit is still tracking well
to the budget and pointed out line items that were higher than originally budgeted as a result
of the pilot lunch shuttle (salaries/benefits and marketing), the City’s insurance requirements,
and the new fleet facility (security and equipment).
Consideration of Grants and Funding Report
Ms. Sharmila Patel shared an update on the status of current FTA and CMAQ grants for
Franklin Transit Authority and Williamson County (a subrecipient) . Items of note included the
award of two new CMAQ grants for Franklin Transit and the subrecipient, Williamson County
vanpool.
Consideration of Transit and VanStar Operating Statistics Report
Mr. Stanton Higgs shared the transit report and discussed ridership numbers though April. April
ridership reached 10,110 passenger trips — the highest monthly total since December —
driven by a strong return of Special Event service and continued TODD demand. He also
shared news about an incident involving a long-time transit rider who fell out of his wheelchair.
Mr. Higgs shared the VanStar report and emphasized the key performance highlights.
Consideration of Resources and Opportunities Report
Ms. Henry shared information about Franklin Transit’s participation in the City’s Touch a Truck
event; with TDOT at the Seniors Food for Thought event ; and the Taco about Transit event
held at the transit center to support the transit master plan. The Tweens and Teens program
has launched for the summer.
Consideration of Outreach and Marketing Report
Ms. Henry discussed Franklin Transit ’s social media presence and highlighted some
successful posts and the use of influencers. Franklin Transit is once again featured in TMA
Group’s bi-monthly e-newsletter, In Motion.
Consideration of Contract Monitor Report
Chairman Schroer shared the news that Christiana Dunn had accepted a new position within
state government. Mr. Baker indicated that t he contract monitor position has been posted by
the City and then reviewed the relevant items from the contractor monitoring report.
Ms. White made a motion to accept the reports presented, and Mr. McElroy seconded the
motion, which then passed unanimously.
Page 4 of 126
3
Update on City of Franklin Parking Study
The City (in partnership with Walker Consultants and STV) is conducting a parking study to identify
opportunities to improve parking access, operations, and the overall experience for residents,
businesses, and visitors in Central Franklin. The City has a website and an online survey to gather
public input. The online survey is now open and available until July 10. Meeting participants were
able to engage in an interactive exercise and learn about focus areas.
Update on Transit Master Plan
Mr. Wally Blain of Benesch provided an update on the transit master plan, focusing on
recommendations in the five categories: Outreach and Communications Improvements; Planning
and Policy Development; Capital and Technology Improvements; Transparency and Performance
Monitoring; and Service Improvements. He pointed out that there was public agreement with the
recommendations and shared the financial plan.
ADJOURN
Chairman Schroer made a motion to adjourn, Mr. McElroy seconded the motion, and it passed
unanimously.
The meeting adjourned at 5:10 PM. The next regularly scheduled meeting will be Tuesday,
August 4 at 4:00 PM in the Eastern Flank Event Facility.
John Schroer, Chairman
Page 5 of 126
The TMA Group
Statement of Financial Position
May 31, 2026
ASSETS
Current Assets
Pinnacle Bank - COF Transit 299.02 $
Receivables - Federal 382,328.00
Receivables - State 90,426.00
Receivables Other - Transit 900.00
Total Current Assets 473,953.02
Total Assets 473,953.02 $
LIABILITIES AND NET ASSETS
Current Liabilities
Accrued Revene Due to Transit 473,953.02 $
Total Current Liabilities 473,953.02
Total Liabilities & Net Assets 473,953.02 $
Unaudited - For Management Purposes Only 7/22/2026 at 1:07 PM
Page 6 of 126
The TMA Group
Statement of Activities
Franklin Transit Authority
For the Eleven Months Ending May 31, 2026
Month
Actual
Month
Budget
YTD
Actual
YTD
Budget
Total
Budget
Percentage YTD
Actual to Budget
Revenues
Fixed Route Fares 1,365.70 $ 2,333.33 $ 22,756.50 $ 25,666.63 $ 28,000.00 81.27
TODD Fares 2,606.50 3,333.33 48,436.50 36,666.63 40,000. 00 121.09
Special Event Fares 150.00 2,416.67 17,964.00 26,583.37 29,000.00 61.94
Local Operating (General Fund) 135,305.40 163,636.87 1 ,427,850.96 1,297,561.91 1,461,745.75 97.68
State Funds 2,277.00 6,047.00 421,868.00 439,939.00 445, 988.00 94.59
Federal Funds 173,306.00 238,452.00 2,164,130.00 2,029, 130.00 2,179,544.00 99.29
Other Funding 800.00 2,300.00 38,558.18 25,400.00 27,700 .00 139.20
Total Revenues 315,810.60 418,519.20 4,141,564.14 3,880 ,947.54 4,211,977.75 98.33
Direct Cost of Program
Labor & Fringe 183,638.29 261,376.04 2,251,321.86 2,156 ,186.46 2,330,497.35 96.60
Services 68,875.85 62,201.83 807,503.33 680,402.98 742,1 80.63 108.80
Fuel 21,398.32 14,808.34 170,814.51 162,891.74 177,700.0 0 96.13
Supplies 1,225.95 1,123.56 11,277.78 12,359.16 13,482.66 83.65
Utilties 4,802.30 3,166.27 47,872.99 34,828.97 37,995.20 126.00
Casualty & Liability 20,911.71 20,815.02 267,466.87 228 ,965.22 249,780.07 107.08
Other Miscellaneous Expenses 14,958.18 9,160.57 166,85 8.72 100,766.27 109,926.84 151.79
Capital Equipment 0.00 45,867.92 418,448.08 504,547.12 5 50,415.00 76.02
Total Direct Cost of Program 315,810.60 418,519.55 4,1 41,564.14 3,880,947.92 4,211,977.75 98.33
Net Difference - Operations 0.00 $ 0.35) ($ 0.00 $ 0.38) ($ 0.00 0.00
Detail of Federal and State Funding
Federal Operating Assistance 126,741.00 $ 159,508.00 $ 1,208,059.00 $ 1,158,841.00 $ 1,230,308.00 98.19
Federal Planning 9,871.00 8,333.00 163,632.00 91,666.00 100,000.00 163.63
Federal CARES Act 0.00 0.00 3,370.00 0.00 0.00 0.00
Federal Preventative Maintenan 28,334.00 30,567.00 345 ,012.00 336,229.00 366,796.00 94.06
Federal Capital Expenditures 0.00 36,694.00 334,758.00 403,637.00 440,332.00 76.02
Federal Software 522.00 667.00 8,912.00 7,333.00 8,000.0 0 111.40
Federal Bus Surveillance 238.00 0.00 27,954.00 1,904.00 1,904.00 1,468.17
Federal Rent Assistance 7,600.00 2,683.00 72,433.00 29, 520.00 32,204.00 224.92
State Operating Assistance 0.00 0.00 346,795.00 373,184 .00 373,184.00 92.93
State Planning 1,233.00 1,042.00 20,451.00 11,458.00 12, 500.00 163.61
State Capital Expenditures 0.00 4,587.00 41,843.00 50,4 54.00 55,041.00 76.02
State Software 65.00 83.00 1,109.00 916.00 1,000.00 110.9 0
State Bus Surveillance 29.00 0.00 2,617.00 238.00 238.00 1,099.58
State Rent Assistance 950.00 335.00 9,053.00 3,689.00 4, 025.00 224.92
Total Federal and State Funding 175,583.00 $ 244,499.00 $ 2,585,998.00 $ 2,469,069.00 $ 2,625,532.00 98.49
For Management Purposes Only Page: 1 7/22/2026 at 1:07 PM
Page 7 of 126
Total Revenue vs Total ExpensesYTD by Category (through Jun)Fixed Route OperationsMonthTotal RevenueTotal ExpensesCategoryYTD ActualYTD BudgetAnnual Total BudgetMonthActualBudget% of BudgetJul $333,379.21$333,379.21Fixed Route Operations838020.7824596.76892333.25Jul 78642.7878810.38100%Aug $302,990.57$302,990.57TODD Operations948156.08831489.3899616.1Aug 71661.1467736.49106%Sep $398,729.24$398,729.24Employee Benefits321756.57292987.02317423.43Sep 90777.0693388.7197%Oct $285,098.51$285,098.51Safety & Security34129.3735566.7438800Oct 64325.4367736.4895%Nov $315,838.68$315,838.68Administration439183.34479834.41518948.16Nov 87519.682667.24106%Dec $410,257.16$410,257.16Planning204540.24114583.37125000Dec 70710.1669922.82101%Jan $323,373.86$323,373.86Other Miscellaneous Expenses438830.6317069.72345894.04Jan 64719.3167736.4996%Feb $286,038.91$286,038.91Marketing50993.1913887.515150Feb 61351.567736.4991%Mar $840,633.75$840,633.75 Mar 97837.0467736.49144%Apr $329,413.65$329,413.65 Apr 73468.2167736.49108%May $315,810.60$315,810.60 May 77008.4793388.6882%Jun $0.00$0.00 Jun 067736.490%TODD OperationsMonthActualBudget% of BudgetJul 82738.7478640.86105%Aug 75514.4968149.75111%Sep 110753.2996185.91115%Oct 77718.4668149.75114%Nov 90428.5781167.7111%Dec 79082.8870410.4112%Jan 76458.7168149.75112%Feb 73763.6668149.75108%Mar 116810.8968149.75171%Apr 82018.4568149.75120%May 82867.9496185.9386%Jun 068149.750%Employee BenefitsMonthActualBudget% of BudgetJul 25562.8824436.41105%Aug 29640.7224436.41121%Sep 32847.3136529.6690%Oct 29478.0324436.41121%Nov 26966.7724436.41110%Dec 27874.9724436.41114%Jan 25844.8624436.41106%Feb 28606.8224436.41117%Mar 33641.6924436.41138%Apr 31490.5624436.41129%May 29801.9636529.6782%Jun 024436.410%Safety & SecurityMonthActualBudget% of BudgetJul 1242.653233.3438%Aug 296.653233.349%Sep 296.653233.349%Oct 296.653233.349%Nov 296.653233.349%Dec 4969.513233.34154%
$0.00$100,000.00$200,000.00$300,000.00$400,000.00$500,000.00$600,000.00$700,000.00$800,000.00$900,000.00
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Dollars ($)
Total Revenue vs Total Expenses - Actual (Monthly)
Total RevenueTotal Expenses
01000002000003000004000005000006000007000008000009000001000000
Fixed Route Operations TODD Operations Employee Benefits Safety & Security Administration Planning Other MiscellaneousExpensesMarketing
Dollars ($) YTD ActualYTD BudgetAnnual Total Budget
100% 106% 97% 95% 106% 101% 96% 91% 144% 108% 82%020000400006000080000100000120000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Fixed Route Operations Actual vs Budget
Year-to-Date Actual vs Budget by Expense Category (through May)
Page 8 of 126
Jan 296.65 3233.34 9%
Feb 2678.85 3233.34 83%
Mar 22804.66 3233.34 705%
Apr 653.8 3233.34 20%
May 296.65 3233.34 9%
Jun 0 3233.34 0%
Administration
Month Actual Budget % of Budget
Jul 43569 48528.37 90%
Aug 36511.69 39113.78 93%
Sep 55222.78 58670.74 94%
Oct 36980.64 39113.78 95%
Nov 41167.08 40051.42 103%
Dec 36444.84 39230.45 93%
Jan 35907.04 39113.78 92%
Feb 34676.6 39113.78 89%
Mar 52775.4 39113.78 135%
Apr 33299.15 39113.78 85%
May 32629.12 58670.75 56%
Jun 0 39113.78 0%
Planning
Month Actual Budget % of Budget
Jul 0 10416.67 0%
Aug 31020.03 10416.67 298%
Sep 33603.98 10416.67 323%
Oct 0 10416.67 0%
Nov 748.58 10416.67 7%
Dec 73790.39 10416.67 708%
Jan 23559.41 10416.67 226%
Feb 0 10416.67 0%
Mar 29479.7 10416.67 283%
Apr 0 10416.67 0%
May 12338.15 10416.67 118%
Jun 0 10416.67 0%
Other Miscellaneous Expenses
Month Actual Budget % of Budget
Jul 42868.08 28824.52 149%
Aug 26347.95 28824.52 91%
Sep 27984.91 28824.52 97%
Oct 26414.25 28824.52 92%
Nov 28522.87 28824.52 99%
Dec 70128.99 28824.52 243%
Jan 37609.02 28824.52 130%
Feb 51714 28824.52 179%
Mar 43142.87 28824.52 150%
Apr 42428.25 28824.52 147%
Actual Budget % of Budget
105% 111% 115% 114% 111% 112% 112% 108% 171% 120% 86%
0
20000
40000
60000
80000
100000
120000
140000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
TODD Operations Actual vs Budget
Actual Budget % of Budget
105% 121% 90% 121% 110% 114% 106% 117% 138% 129% 82%
0
5000
10000
15000
20000
25000
30000
35000
40000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Employee Benefits Actual vs Budget
Actual Budget % of Budget
38% 9% 9% 9% 9% 154% 9% 83% 705% 20% 9%
0
5000
10000
15000
20000
25000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Safety & Security Actual vs Budget
Actual Budget % of Budget
Page 9 of 126
May 41669.41 28824.52 145%
Jun 0 28824.52 0%
Marketing
Month Actual Budget % of Budget
Jul 15108 1262.5 1197%
Aug 1000 1262.5 79%
Sep 4308.06 1262.5 341%
Oct 5741.09 1262.5 455%
Nov 5407.28 1262.5 428%
Dec 3125 1262.5 248%
Jan 2999 1262.5 238%
Feb 2400 1262.5 190%
Mar 2216.79 1262.5 176%
Apr 1800 1262.5 143%
May 6887.97 1262.5 546%
Jun 0 1262.5 0%
Actual Budget % of Budget
90% 93% 94% 95% 103% 93% 92% 89% 135% 85% 56%
0
10000
20000
30000
40000
50000
60000
70000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Administration Actual vs Budget
Actual Budget % of Budget
0% 298% 323% 0% 7% 708% 226% 0% 283% 0% 118%
0
10000
20000
30000
40000
50000
60000
70000
80000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Planning Actual vs Budget
Actual Budget % of Budget
149% 91% 97% 92% 99% 243% 130% 179% 150% 147% 145%
0
10000
20000
30000
40000
50000
60000
70000
80000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Other Miscellaneous Expenses Actual vs Budget
Actual Budget % of Budget
Page 10 of 126
Actual Budget % of Budget
1197% 79% 341% 455% 428% 248% 238% 190% 176% 143% 546%
0
2000
4000
6000
8000
10000
12000
14000
16000
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Amount
Marketing Actual vs Budget
Actual Budget % of Budget
Page 11 of 126
The TMA Group
Statement of Activities
Franklin Transit Authority
For the Eleven Months Ending May 31, 2026
Month
Actual
Month
Budget
YTD
Actual
YTD
Budget
Total
Budget
Revenues
COF Transit Operating 134,071.25 $ 159,508.31 $ 1,365,545.64 $ 1,252,146.47 $ 1,412,203.75
Fares 4,122.20 8,083.33 89,157.00 88,916.63 97,000.00
Other Revenues 800.00 800.00 38,558.18 8,900.00 9,700.00
State Funding 1,045.00 418.00 359,576.00 378,027.00 378, 447.00
Federal Funding 163,434.00 193,425.00 1,665,739.00 1,53 3,827.00 1,639,212.00
Total Revenues 303,472.45 362,234.64 3,518,575.82 3,261 ,817.10 3,536,562.75
Direct Cost of Program
Salaries & Wages - Admin 21,155.13 39,697.46 296,307.2 1 326,054.40 352,519.36
Salaries & Wages Transit Operations 29,290.65 41,594. 50 350,396.39 345,646.08 373,375.71
Salaries & Wages - Drivers 84,493.33 125,033.45 1,119, 694.61 1,038,785.00 1,122,140.60
Taxes & Benefits - Transit Admin 3,581.12 5,683.03 44, 902.05 46,112.60 49,901.29
Taxes & Benefits - Transit Operations 7,477.25 9,904. 62 80,676.89 80,222.49 86,825.48
Taxes & Benefits - Drivers 37,553.03 39,212.98 356,397 .75 316,615.89 342,734.91
Uniforms 87.78 250.00 2,946.96 2,750.00 3,000.00
Professional Services 9,790.86 5,323.05 53,218.73 58,55 3.55 63,876.57
Transit Building Maintenance 3,233.98 2,666.67 33,512. 30 29,333.37 32,000.00
Transit Vehicle Maintenance 25,482.00 30,291.67 322,73 8.75 333,208.37 363,500.00
Transit Center Cleaning 1,900.00 2,083.33 22,460.00 22, 916.63 25,000.00
Transit Safety 0.00 1,250.00 1,193.15 13,750.00 15,000.0 0
IT Support 5,684.36 4,464.64 53,078.30 49,111.04 53,575. 70
Software Licensing Expenses 653.00 833.33 11,140.58 9,1 66.63 10,000.00
Transit Security 0.00 1,666.67 29,673.07 18,333.37 20,00 0.00
Transit Surveillance 296.65 316.67 3,263.15 3,483.37 3,8 00.00
Legal Fees 0.00 20.83 1,820.00 229.13 250.00
Transit-DAM Compliance 620.00 333.33 3,670.08 3,666.63 4 ,000.00
Payroll Fees 1,988.88 1,272.47 16,201.79 10,180.02 11,02 8.36
Transit Fuel & Lubricants 21,398.32 14,808.34 170,814. 51 162,891.74 177,700.00
Postage and Supplies 1,225.95 1,123.56 11,277.78 12,359 .16 13,482.66
Utilities 4,802.30 3,166.27 47,872.99 34,828.97 37,995.2 0
Trolley Insurance 17,125.70 15,974.42 177,726.22 175,71 8.62 191,693.00
Transit General Liability 1,359.74 1,600.42 15,935.37 1 7,604.62 19,205.00
Payouts for Insured Liab Damag 0.00 766.67 19,382.85 8, 433.37 9,200.00
Errors & Omissions Liability 946.32 1,125.00 10,409.52 12,375.00 13,500.00
Insurance General Office & D&O 1,479.95 1,348.51 44,01 2.91 14,833.61 16,182.07
Vehicle Licensing & Registrati 0.00 0.00 63.69 0.00 0.00
Dues and Subscriptions 1,655.94 1,949.69 30,075.14 21,4 46.59 23,396.28
Meetings 0.00 0.00 459.32 0.00 0.00
Travel and Training 130.27 673.88 5,677.41 7,412.68 8,08 6.56
Equipment - Other 725.22 82.02 10,637.55 902.22 984.20
Bank Fees 44.64 37.50 620.42 412.50 450.00
Marketing & Advertising 6,887.97 1,262.50 50,993.19 13, 887.50 15,150.00
Office Rent 10,512.39 3,900.14 98,955.03 42,901.54 46,80 1.70
Equipment Lease 557.50 508.33 4,538.16 5,591.63 6,100.00
For Management Purposes Only Page: 1 7/22/2026 at 1:07 PM
Page 12 of 126
The TMA Group
Statement of Activities
Franklin Transit Authority
For the Eleven Months Ending May 31, 2026
Month
Actual
Month
Budget
YTD
Actual
YTD
Budget
Total
Budget
Equipment Usage (Depreciation) 1,332.22 2,009.01 15,56 2.70 22,099.11 24,108.10
ADA Expenditures 0.00 0.00 269.30 0.00 0.00
Total Direct Cost of Program 303,472.45 362,234.96 3,5 18,575.82 3,261,817.43 3,536,562.75
Net Difference - Operations 0.00 $ 0.32) ($ 0.00 $ 0.33) ($ 0.00
Planning
Federal Planning 9,871.00 $ 8,333.00 $ 163,632.00 $ 91,666.00 $ 100,000.00
State Planning 1,233.00 1,042.00 20,451.00 11,458.00 12, 500.00
COF Planning Cost Share 1,234.15 1,041.66 20,457.24 11, 459.34 12,500.00
Total Planning Revenues 12,338.15 10,416.66 204,540.24 114,583.34 125,000.00
Planning Costs
Planning/Transit 12,338.15 10,416.67 204,541.66 114,583 .37 125,000.00
Zero Emission Study Match 0.00 0.00 (1.42) 0.00 0.00
Net Difference - Planning 0.00 $ 0.01) ($ 0.00 $ 0.03) ($ 0.00
Equipment
Federal Capital Expenditures 0.00 $ 36,694.00 $ 334,758.00 $ 403,637.00 $ 440,332.00
State Capital Expenditures 0.00 4,587.00 41,843.00 50,4 54.00 55,041.00
COF Capital Cost Share 0.00 3,086.90 41,847.08 33,956.1 0 37,042.00
Sale of Surpls Asset 0.00 1,500.00 0.00 16,500.00 18,000 .00
Total Equipment Revenues 0.00 45,867.90 418,448.08 504, 547.10 550,415.00
Equipment Costs
Equipment - Transit 0.00 45,867.92 418,448.08 504,547.1 2 550,415.00
Net Difference - Equipment 0.00 $ 0.02) ($ 0.00 $ 0.02) ($ 0.00
For Management Purposes Only Page: 2 7/22/2026 at 1:07 PM
Page 13 of 126
1 | P a g e
Grants Update
The TMA Group negotiates on behalf of the Franklin Transit Authority and Williamson County vanpool with Nashville MTA and RTA for the distribution of Federal
Transit Administration (FTA) Section 5307 grant funding made available to the Nashville-Davidson Urbanized Area (UZA).
Current Federal Transit Administration Grant Balances as of May 12, 2026
Funding
Source Grant Number FTA Transit
FTA -
Williamson
Passthrough -
Vanpool Uses TIP ID UPWP Study
5307 TN -90 -X384 -00 $101,446.00 $0 Preventive Maintenance 2015 -65 -075
5307 TN -90 -X352 -00 $9053.00 $0 Preventive Maintenance 2015 -65 -075
5307 TN -2019 -021 -00 $8 48,991 .00 $10.00
Shelters, Security, Support
Software/ Equipment , Bus 2015 -65 -060
5307 TN -2020 -008 -00 $23,513.00 $5 20,000 .00 Security, Vanpool Vehicles
2019-65-128;
2015 -65 -075
5307
CARES
Act TN-2020-018-00 $2.00 $740.00
Vanpool Operating
Assistance N/A
5307 TN -2022 -031 -00 $121,706.00 $475,165.00
Planning, Security, Rent
(WC: Operating Assistance
and Planning)
2019-65-128;
2019-65-131;
2019-65-129;
2019 -65 -130
Franklin Transit Authority: Transit Master Plan
AND Williamson County Vanpool: Transit
Demand Management (TDM) Strategies Study
AND Williamson County Vanpool/TMA Group:
Coordination/Planning for Transportation
Service Gaps Study
5307 TN -2023 -037 -00 $712,264 .00 $325,165 .00
Operating, Security,
(WC: Operating Assistance)
2015 -65 -060;
2018-65-056;
2019 -65 -128
5307
ARP TN -2022 -027 -00 $2,359 .00 $2.00 Security N/A
5307 TN -2024 -031 -00 $1,425,460.00 $0
Microtransit: Operating
Assistance and
Hardware/Software 2022 -65 -154
5307 TN -2024 -024 -00 $643,953 .00 $465,447.00
PM, Security, Safety,
Support Vehicle ,Training
2011-65-016;
2015 -65 -060;
Page 14 of 126
2 | P a g e
Grants Update
(WC: Operating Assistance
and Security)
2018 -65 -056;
2019-65-128
5307 TN -2025 -018 -00 $4, 359,093 .00 $600,202.00
Operating, PM, Security,
Safety,Rolling Stock,Capital
for ZEB, Planning
(WC: Operating Assistance
and Security)
2018 -65 -056;
2011-65-016;
2015-65-060;
2019-65-128;
2019 -65 -129
Franklin Transit Authority: Transit Master
Plan
5307 TN -2025 -016 -00 $737,377.00 $983,140.00
Preventive Maintenance
(WC: Replacement Vans)
2011-65-016;
2015 -65 -075
5307 TN-2026-017-00 $3,304,543.00 $1,899,798.00
Operating, PM, Planning,
Security, Rent
(WC: Operating Assistance
Security, Mobility Mgt.)
2018 -65 -056;
2011-65-016;
2015-65-060;
2019-65-128;
2019-65-129
2014 -85 -014
Franklin Transit Authority: Transit
Master Plan
CMAQ $2, 754,035. 25
Vanpool Post-Pandemic
Initiative 2022 -65 -157
Grant and Procurement Updates:
Budget Revisions have been approved for grants TN-90-X384-00 and TN-90-X352-00 to move all remaining funds to preventive maintenance.
The annual FFY2026 application for Franklin Transit Authority and Williamson County vanpool has been approved and will be available for use.
Award TN-2017-020 has been closed out.
The three new buses are all in service, currently operating on fixed routes.
TDOT’s Congestion Mitigation and Air Quality (CMAQ) Improvement Program awarded funds for Franklin Transit and Williamson County Vanpool. The
Franklin Transit Historic Trolley Repower & Restoration Program is for $160,000 with a 20% local match. The TMA Group Hybrid Vanpool Fleet Replacement
(5) & Expansion (5) Program is for $332,000 with a 10% state and 10% local match. These have been included in the TIP, and the next step is to ask TDOT
to flex the funds over to the Federal Transit Administration.
Page 15 of 126
FRANKLIN TRANSIT AUTHORITY
Board Report — July 2026
Reporting Period: May & June 2026
RIDERSHIP REPORT — May & June 2026
May 2026 Passenger Trips
Service Passenger Trips
Blue Fixed Route 1,255
Red Fixed Route 1,610
Fixed Route Subtotal 2,865
Lunch Shuttle (Fixed) 91
Special Events —
TODD (Demand Response) 2,809
MAY TOTAL 5,765
June 2026 Passenger Trips
Service Passenger Trips
Blue Fixed Route 1,299
Red Fixed Route 1,659
Fixed Route Subtotal 2,958
Lunch Shuttle (Fixed) 93
Special Events 4
TODD (Demand Response) 2,038
JUNE TOTAL 5,093
Analysis: Combined May and June ridership totaled 10,858 passenger trips. TODD Demand
Response led May at 2,809 trips (48.7% of monthly ridership). June TODD moderated to 2,038 trips
while the Red Route held steady at 1,659. Both months reflect typical late-spring and early-summer
patterns with no major Special Events activity.
Page 16 of 126
Total Fixed Route TODD Special Lunch* Fixed Route Red Blue Lunch*
Monthly 7,243 2,975 2,655 1,587 120 Monthly 2,975 1,579 1,396 120
Daily 279 114 102 61 7 Daily 114 61 54 7
* Lunch shuttle in operation for 12 days in September
Average Ridership by Service (FY23-Current) Average Ridership by Route (FY23-Current)
Franklin Transit Operating Statistics
-
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000Monthly Unlinked Passenger Trips
Date
Ridership by Service
FY 2023-Current
Fixed Route TODD Special Lunch
-
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
4,500Monthly Unlinked Passenger Trips
Date
Fixed Route Ridership by Route
FY 2023-Current
Fixed Route Blue Red Lunch
Page 17 of 126
FISCAL YEAR 2026 — FULL YEAR SUMMARY (July 2025 – June 2026)
Service Jul–Apr (10 mo.) May June FY2026 Total
Fixed Routes (Blue + Red) 31,375 2,865 2,958 37,198
TODD (Demand Response) 30,807 2,809 2,038 35,654
Lunch Shuttle 1,045 91 93 1,229
Special Events 15,477 0 4 15,481
TOTAL 78,704 5,765 5,093 89,562
Monthly Ridership Trend — FY2026 Full Year
Month Blue Red Lunch Special TODD Total
Jul 1,371 1,970 — 208 1,927 5,476
Aug 1,672 1,867 — 139 2,409 6,087
Sep 1,685 1,763 198 634 3,669 7,949
Oct 1,699 1,915 258 6,137 3,642 13,651
Nov 1,358 1,531 155 118 3,228 6,390
Dec 1,277 1,619 139 5,112 2,638 10,785
Jan 996 1,396 65 3 2,735 5,195
Feb 1,315 1,635 51 5 3,330 6,336
Mar 1,419 1,879 76 4 3,422 6,800
Apr 1,372 1,750 103 3,348 3,753 10,326
May 1,255 1,610 91 — 2,809 5,765
Jun 1,299 1,659 93 4 2,038 5,093
FY26 16,718 20,594 1,229 15,712* 35,600 89,853
* October (Pilgrimage Festival: 6,137 trips) and April (3,348 trips) were the peak Special Events
months. TODD led all service categories for FY2026 at 35,600 trips — 39.7% of annual ridership.
Page 18 of 126
FY2025 vs. FY2026 — FULL YEAR RIDERSHIP COMPARISON
Complete twelve-month comparison using sourced data for both fiscal years (July–June).
Month FY2025 FY2026 Change
July 5,491 5,476 -0.3%
August 6,583 6,087 -7.5%
September 9,823 7,949 -19.1%
October 11,837 13,651 +15.3%
November 6,806 6,390 -6.1%
December 13,589 10,785 -20.6%
January 6,196 5,195 -16.2%
February 6,168 6,336 +2.7%
March 8,253 6,800 -17.6%
April 12,236 10,326 -15.6%
May 7,606 5,765 -24.2%
June 5,409 5,093 -5.8%
Full Year Total 99,997 89,853 -10.1%
Context: FY2026 finished 10.1% below FY2025. October (+15.3%) and February (+2.7%) were the
only months FY2026 outperformed FY2025. The largest gaps were December (−2,804), May
(−1,841), and April (−1,910), all driven by lower Special Events activity than the prior year. Core
fixed-route and TODD service remained broadly stable year over year.
Page 19 of 126
FY2025 vs. FY2026 — Monthly Ridership Chart
Month ■ FY2025 ■ FY2026
Jul 5,491
5,476
Aug 6,583
6,087
Sep 9,823
7,949
Oct 11,837
13,651
Nov 6,806
6,390
Dec 13,589
10,785
Jan 6,196
5,195
Feb 6,168
6,336
Mar 8,253
6,800
Apr 12,236
10,326
May 7,606
5,765
Jun 5,409
5,093
Page 20 of 126
RideDATE TYPE ROUTE CATEGORY RIDERS NOTES REQUESTED BY
5/18/2026 Special Lunch Rte Lunch 3 FTA
5/21/2026 Special Lunch Rte Lunch 2 FTA
5/26/2026 Special Lunch Rte Lunch 2 FTA
5/27/2026 Special Lunch Rte Lunch 24 FTA
5/28/2026 Special Lunch Rte Lunch 22 FTA
5/29/2026 Special Lunch Rte Lunch 2 FTA
6/2/2026 Special Lunch Rte Lunch 6 FTA
6/3/2026 Special Lunch Rte Lunch 2 FTA
6/4/2026 Special Lunch Rte Lunch 3 FTA
6/5/2026 Special Lunch Rte Lunch 16 FTA
6/5/2026 Special Special Special 4 Art Crawl ART COUNCIL
6/8/2026 Special Lunch Rte Lunch 2 FTA
6/9/2026 Special Lunch Rte Lunch 4 FTA
6/11/2026 Special Lunch Rte Lunch 11 FTA
6/12/2026 Special Lunch Rte Lunch 6 FTA
6/16/2026 Special Lunch Rte Lunch 20 FTA
6/17/2026 Special Lunch Rte Lunch 2 FTA
6/18/2026 Special Lunch Rte Lunch 4 FTA
6/23/2026 Special Lunch Rte Lunch 2 FTA
6/24/2026 Special Lunch Rte Lunch 10 FTA
6/26/2026 Special Lunch Rte Lunch 5 FTA
7/2/2026 Special Lunch Rte Lunch 4 FTA
7/3/2026 Special Lunch Rte Lunch 8 FTA
7/3/2026 Special Special Special 5 Art Crawl ART COUNCIL
7/6/2026 Special Lunch Rte Lunch 3 FTA
7/7/2026 Special Lunch Rte Lunch 19 FTA
7/8/2026 Special Lunch Rte Lunch 2 FTA
7/9/2026 Special Lunch Rte Lunch 2 FTA
7/10/2026 Special Lunch Rte Lunch 13 FTA
7/14/2026 Special Lunch Rte Lunch 23 FTA
7/15/2026 Special Lunch Rte Lunch 20 FTA
7/16/2026 Special Lunch Rte Lunch 11 FTA
7/17/2026 Special Lunch Rte Lunch 12 FTA
7/20/2026 Special Lunch Rte Lunch 3 FTA
7/22/2026 Special Special Special 457 Teen Event FTA
Page 21 of 126
Power BI Desktop
FiscalYear Fiscal
Month
Sum of
RIDERS
Route
FY26 Dec 139 Lunch Rte
FY26 Dec 1,484 Red
FY26 Dec 2,638 TODD
FY26 Jan 952 Blue
FY26 Jan 64 Lunch Rte
FY26 Jan 1,295 Red
FY26 Jan 2,735 TODD
FY26 Feb 1,252 Blue
FY26 Feb 51 Lunch Rte
FY26 Feb 1,540 Red
FY26 Feb 3,330 TODD
FY26 Mar 1,354 Blue
FY26 Mar 76 Lunch Rte
FY26 Mar 1,764 Red
FY26 Mar 3,422 TODD
FY26 Apr 1,319 Blue
FY26 Apr 103 Lunch Rte
FY26 Apr 1,659 Red
FY26 Apr 3,753 TODD
FY26 May 1,207 Blue
FY26 May 91 Lunch Rte
FY26 May 1,513 Red
FY26 May 2,809 TODD
FY26 Jun 1,256 Blue
FY26 Jun 93 Lunch Rte
FY26 Jun 1,597 Red
FY26 Jun 2,038 TODD
Total 61,406
Lunch Riders vs Total Riders
0 500 1,000 1,500 2,000
Blue
Lunch Rte
Red
TODD
Blue
Lunch Rte
Red
TODD
Blue
Lunch Rte
Red
TODD
Blue
Lunch Rte
Red
TODD
Blue
Lunch Rte
Red
TODD
Blue
Lunch Rte
Red
TODD
JanFebMarAprMayJun
952
…
1295
2735
1252
1540
3330
1354
…
1764
3422
1319
1…
1659
3753
1207
91
1513
2809
1256
93
1597
2038
Fiscal Year
FY26
Type
Multiple selecti…
Route
Multiple selections
Category
Multiple selections
Fiscal Month
Multiple selections
Fiscal Quart…
All
Lunch Route Total
1,228
Special Route Percentage
2%
RIDERS by Fiscal Quarter
(44.2…)
(39.19%)
(16.54%) 9.43K
8.35K
3.52K
Fiscal Quarter
FQ2
FQ3
FQ1
Page 22 of 126
VANSTAR VANPOOL PROGRAM
Williamson County — TMA Group
Informational Report — Subrecipient of Franklin Transit Authority
Board Report — July 2026 | Reporting Period: FY2025 (July 2024–June 2025) vs. FY2026 (July 2025–June 2026)
Prepared for: Franklin Transit Authority
This report is provided for informational purposes, summarizing the VanStar vanpool program operated by Williamson County TMA
Group as a subrecipient of Franklin Transit Authority. All figures below are sourced directly from VanStar's NTD Ridership Reports
(RidePro) for FY2025 and FY2026.
1. FISCAL YEAR PERFORMANCE COMPARISON
FY2025 (July 2024–June 2025) vs. FY2026 (July 2025–June 2026)
Metric FY2025 (Jul '24–Jun
'25)
FY2026 (Jul '25–Jun
'26)
Change
Unlinked Passenger Trips (UPT) 74,392 73,325 -1.4%
Passenger Miles Traveled (PMT) 3,329,057 3,283,728 -1.4%
Vehicle Revenue Miles (VRM) 828,965 884,965 +6.8%
Vehicle Revenue Hours (VRH) 20,850 22,452 +7.7%
Maximum Vehicles in Operation
(VOMS)
45 48 +6.7%
Source: VanStar NTD Ridership Reports (RidePro Standard NTD Report Calculations), FY2025 and FY2026. UPT and PMT
declined slightly year-over-year even as fleet capacity and service hours grew — see Section 2.
2. SERVICE OPERATIONS SUMMARY
Metric FY2025 FY2026 Change
Active Routes 53 55 +3.8%
Total Vehicles Available 116 113 -2.6%
Average Vehicles in Operation 35 37 +5.7%
Total Vehicle Trips (One-Way) 18,865 19,738 +4.6%
Average Passengers per Trip 3.97 3.73 -6.2%
Aggregate Route Operating Days 9,369 9,846 +5.1%
VanStar operates Monday through Friday only; no Saturday or Sunday service is provided. NTD ridership figures are calculated
on a weekday-service basis per RidePro's standard methodology. Average passengers per trip declined even as vehicles in
operation and total trips increased, indicating more routes running at lower average occupancy in FY2026.
Page 23 of 126
3. VMT & MILEAGE IMPACT
Metric FY2025 FY2026 Change
Total Recorded Vehicle Miles 839,045 903,257 +7.7%
Recorded Revenue Vehicle Miles
(VRM)
828,965 884,965 +6.8%
Total Route Revenue Miles
(Scheduled)
886,117 945,700 +6.7%
Total Miles Reduced (VMT
Avoided)
2,500,092 2,398,763 -4.1%
Total Miles Reduced reflects passenger commute miles avoided through vanpool ridership versus driving alone (SOV), calculated
as recorded passenger miles minus recorded vanpool revenue vehicle miles, per NTD methodology. Cost-savings, fuel, and
emissions (GHG/pollutant) figures are not included in this revision, as they are not part of the NTD ridership source files reviewed;
they can be added once a corresponding, verified environmental/economic dataset is provided.
4. TOP PERFORMING ROUTES — FY2026 (BY MILES REDUCED)
Route Provider Pass. Trips Rev. Veh. Miles Miles Reduced
Cookeville–Smyrna Williamson Co. 2,916 25,220 186,090
Clarksville–Ashland City Williamson Co. 5,356 14,755 156,829
Columbia–Smyrna Williamson Co. 2,810 23,120 149,513
Summertown–Smyrna Williamson Co. 1,966 27,185 124,407
Cookeville–Nashville Williamson Co. 1,622 27,158 92,276
Clarksville–Nashville VA Williamson Co. 2,355 20,744 80,173
Clarksville–Brentwood Williamson Co. 1,764 22,063 73,667
Clarksville–Nashville (Knapp) Williamson Co. 1,808 19,112 66,787
Clarksville–Brentwood (2) Williamson Co. 1,656 13,958 66,214
Williamson County directly operated routes represented 99.2% of FY2026 ridership (73,325 total trips), up from 90.7% in FY2025;
Regional Transportation Authority (RTA)-affiliated routes fell from 9.3% to 0.8% of ridership over the same period. Source:
VanStar NTD Ridership Report, FY2026.
Page 24 of 126
5. VANSTAR REGIONAL SERVICE MAP
The map below illustrates the geographic reach of the VanStar vanpool network, connecting commuters across Middle
Tennessee to major employment centers in the Nashville metropolitan region.
VanStar Regional Vanpool Network — Middle Tennessee Service Area
6. PIPELINE — ROUTES IN STARTUP
The Amazon Nashville – Route 1 vanpool has launched and moved to active service. New routes continue to be added across
federal, healthcare, and defense employment sectors.
Route / Employer Destination Type Status
Amazon Nashville – Route 1 Nashville, TN Corporate / Logistics Active –
Launched
Amazon Nashville – Route 2 Nashville, TN Corporate / Logistics Forming –
Recruiting
VA Clinic Nashville Nashville, TN Federal Healthcare Forming –
Recruiting
Veterans Benefits Admin (VBA) –
Brentwood
Brentwood, TN Federal – VBA Forming –
Recruiting
Arnold Air Force Base Tullahoma, TN Federal – DoD Forming –
Recruiting
MidCumberland – Dickson Dickson, TN Regional Transit Connect Vehicle
Assignment
Pipeline status is tracked separately from NTD ridership reporting and reflects sales/business-development activity as of this
reporting period, not figures from the FY2025/FY2026 NTD files.
7 new routes are in the active sales pipeline, representing significant potential ridership and VMT -reduction growth
upon launch.
Page 25 of 126
May - July 2026
Page 26 of 126
FTA Facebook Content Overview
May- July 2026
Page 27 of 126
Franklin Transit Social Overview
High engagement with -
Tweens and Teens
Teens Try Transit Day
Endorsements from leaders
Influencer
How to use FTA
Page 28 of 126
FTA Facebook Demographics
May- July 2026
Page 29 of 126
FTA Facebook Demographics
May - July 2026
Page 30 of 126
FTA Facebook Top Posts
May - July 2026
Page 31 of 126
FTA Facebook Top Posts
May - July 2026
Page 32 of 126
FTA Facebook Top Posts
May - July 2026
Page 33 of 126
FTA Facebook Top Posts
May - July 2026
Page 34 of 126
FTA Facebook Top Posts
May - July 2026
Page 35 of 126
FTA Instagram Content Overview
May - July 2026
Page 36 of 126
FTA Instagram Demographics
May - July 2026
Page 37 of 126
FTA Instagram Demographics
May - July 2026
Page 38 of 126
FTA Instagram Top Posts
May - July 2026
Page 39 of 126
FTA Instagram Top Posts
May - July 2026
Page 40 of 126
FTA Instagram Top Posts
May - July 2026
Page 41 of 126
FTA Instagram Top Posts
May - July 2026
Page 42 of 126
FTA Instagram Top Posts
May - July 2026
Page 43 of 126
Google Analytics
(April - June 2026)
Page 44 of 126
Communications &
Outreach Committee
Purpose
• Execute Master Plan Initiatives
• Consistency in communication
• Provide oversight, coordination
and collaboration between
Franklin Transit Board/City of
Franklin and TMA Group
• Members: FTA ex-officio,
Franklin Staff, TMA Group Staff
Page 45 of 126
Thank you!
Page 46 of 126
Franklin Transit Authority
CONTRACTOR MONITORING
Requirement Yes Meeting
Date Initials Note
LEGAL: Have there been any legal matters that may affect the Authority or
the Federal Transit Administration?
X AMB Pauline Hay on behalf
of James Dorton vs.
Franklin Transit
Authority and The
Transportation
Management
Association Group
LEGAL: Are there any instances relating to false claims under the False
Claims Act or fraud?
LEGAL: Has TMA used only non-appropriated funds for any lobbying
activities
FINANCIAL MANAGEMENT: Have there been any changes to financial
policies, procedures, or the organizational structure?
FINANCIAL MANAGEMENT: Has TMA conducted the required Single
Audit, submitted the required documentation to the Franklin Transit Authority
(FRTA), and resolved any identified issues?
TECHNICAL CAPACITY – AWARD MGT: Have any milestone progress
reports (MPRs) and Federal Financial Reports (FFRs) been submitted to
FTA?
X AMB Completed the MPR
and FFR for TN2022-
031
TECHNICAL CAPACITY – AWARD MGT: Have any grant awards been
closed out?
X AMB Federal Award ID
Number TN-2020-018-
01
TECHNICAL CAPACITY – PROGRAM MGT: Has TMA been suspended,
debarred, ineligible, or voluntarily excluded from participation in federally
assisted transactions?
TECHNICAL CAPACITY – PROGRAM MGT: Has the annual risk
assessment been submitted to TDOT since the last meeting?
TECHNICAL CAPACITY – PROJECT MGT: Has the TMA Group
implemented any new capital or planning project? (Needs board approval)
X AMB 2024-0302 contract
extension
TRANSIT ASSET MANAGEMENT: Has the TMA Group submitted the
updated TAM plan to Franklin Transit Authority (FRTA) for review and
approval?
TRANSIT ASSET MANAGEMENT: Has the TMA Group shared its annual
performance targets with the Board?
SATISFACTORY CONTINUING CONTROL: Have there been any changes
to real property? Has there been or will there be any incidental use of real
property?
SATISFACTORY CONTINUING CONTROL: Are there any additions of FTA-
funded equipment? Was any equipment withdrawn from use and disposed
of in accordance with 2 CFR 200 and FTA requirements?
X AMB Submitted the 2026
Urban Asset
Reconciliation
spreadsheet to TDOT
Bus 117 Auctioned
3 new busses
SATISFACTORY CONTINUING CONTROL: Are there any changes to the
bus fleet that impacts FTA requirements for spare ratios and contingency
fleets?
2 CFR 200.331 Requirement for pass-through entities
All pass-through entities must: (d) Monitor the activities of the subrecipient as necessary to ensure that the subaward is used for
authorized purposes, in compliance with Federal statutes, regulations, and the terms and conditions of the subaward; and that subaward
performance goals are achieved.
Page 47 of 126
Requirement Yes Meeting
Date Initials Note
MAINTENANCE: Have any changes been made to the maintenance plan or
TMA's program for preventive maintenance inspections
MAINTENANCE: Have there been any major warranty issues? X AMB Bus 123 engine
replacement out of
warranty
PROCUREMENT: Have there been any changes to the procurement
policies and procedures?
PROCUREMENT: Have any procurement protests been received or
decided?
PROCUREMENT: Have any revenue contracts or capital leases been
awarded?
DISADVANTAGED BUSINESS ENTERPRISE (DBE): Have there been any
changes to the DBE plan, goal, or the person designated as the DBELO?
DISADVANTAGED BUSINESS ENTERPRISE (DBE): Has the TMA Group
submitted the Uniform Report of DBE Awards or Commitments and
Payments semi-annually by the required due dates?
DISADVANTAGED BUSINESS ENTERPRISE (DBE): Have there been any
DBEs terminated/substituted on a project?
TITLE VI: Have there been any changes to the Title VI program or
procedures?
TITLE VI: Have there been any Title VI complaints or investigations?
TITLE VI: Are there any proposed changes to fares and/or transit service
that need Board review and approval?
TITLE VI: Are there any upcoming planning activities? How will public
participation and minority needs be considered?
AMERICANS WITH DISABILITIES ACT (ADA): Have there been any ADA-
related complaints? How have they been resolved?
AMERICANS WITH DISABILITIES ACT (ADA): Have there been any
changes to facilities or buses that impact access?
AMERICANS WITH DISABILITIES ACT (ADA): Have there been any
changes to ADA complaint procedures and the ADA reasonable modification
policy?
ADA COMPLEMENTARY PARATRANSIT: Have there been any changes
to the paratransit eligibility determination process?
ADA COMPLEMENTARY PARATRANSIT: Have there been any changes
to the rider's guide, application form, or the sample notification letter
templates?
DRUG-FREE WORKPLACE ACT: Have there been any changes to the
Drug-Free Workplace policy or to the ongoing program?
DRUG-FREE WORKPLACE ACT: Have there been any personnel action(s)
taken regarding drug statute violation(s) that occurred in the workplace?
DRUG AND ALCOHOL PROGRAM: Have there been any changes to the
board-adopted drug and alcohol misuse policy?
X AMB BAI for COF DAM
Policy
DRUG AND ALCOHOL PROGRAM: Have there been any changes to the
list of covered employees placed in safety sensitive positions and
supervisors/company officials charged with making reasonable suspicion
determinations?
DRUG AND ALCOHOL PROGRAM: Has there been any training offered to
employees since the last board meeting?
Page 2 of 3
Page 48 of 126
Requirement Yes Meeting
Date Initials Note
SECTION 5307 PROGRAM: Is there a new/updated written agreement with
the Metropolitan Planning Organization (MPO) that determines mutual
responsibilities in carrying out the metropolitan transportation planning
process?
SECTION 5307 PROGRAM: Has the proposed budget and proposed
projects been shared with the board?
SECTION 5307 PROGRAM: Have the proposed annual transit security
expenditures been shared with the board?
SECTION 5307 PROGRAM: Have any changes been made to the policy
detailing the public comment process on increases in the basic fare
structure or implementing a major service reduction ?
SECTION 5307 PROGRAM: Have the annual Certifications and
Assurances been signed?
X AMB 2027 Report Kickoff
for Franklin Transit
Authority in TrAMS
PUBLIC TRANSPORTATION AGENCY SAFETY PLAN: Does the recipient
have an ASP with all required elements?
X AMB Updated PTASP
Chair, Franklin Transit Authority Date
The information marked above was presented to and reviewed by FRTA board members at the stated meeting.
Page 3 of 3
Page 49 of 126
FLEET UPDATE — New Vehicle Procurement
Franklin Transit has procured three (3) new cutaway replacement vehicles. This procurement is
in line with the approved Franklin Transit Authority budget and the Franklin Transit Asset
Management Plan. This procurement reflects the Federal Transit Administration’s emphasis on
maintaining vehicle fleets in a state of good repair. The procurement for all three vehicle and
options is $411,255.00 and is 80/10/10 5307 funding. These vehicles should be delivered in the
next 60-75 days.
The vehicles being replaced have aged out according to Federal Transit Administration rules,
having joined the fleet pre-pandemic and exceeded their useful life. Their retirement ensures the
active fleet continues to meet FTA safety and reliability standards.
Vehicle Specifications
These vehicles are the same make, model, and configuration as those purchased in
2025–2026, ensuring fleet consistency in driver training, parts inventory, and
maintenance procedures.
FLEET FACILITY UPDATE — 203 Beasley Drive
Parking Area Reseal — August 2026:
The property landlord will be resealing the parking area the first two weekends in August. During
both weekends, the Franklin Transit fleet and all driver vehicles will need to be temporarily
relocated off the lot. Coordination for vehicle staging is underway and drivers will be notified in
advance with specific dates and instructions.
Security Camera System — Complete:
All security cameras covering the parking area at 203 Beasley Drive are now fully installed and
operational. The system provides comprehensive coverage of the vehicle lot and perimeter,
improving safety and security for fleet assets and staff.
Page 50 of 126
FRANKLIN
TRANSIT
Franklin Transit Master Plan
Executive Summary
June 2026
Page 51 of 126
708 Columbia Ave
Franklin, TN 37064
(615) 628-0260
www.franklintransit.org
FRANKLIN
TRANSIT
Page 52 of 126
1Franklin Transit Master Plan | Executive Summary
Table of Contents
Introduction and Key Themes ...........................................................2
Planning Process ...............................................................................5
Existing Transit Service and Existing Conditions ...............................6
Public Involvement ..........................................................................12
Goals, Objectives, and Performance Metrics ..................................14
Transit Needs, Improvement Strategy, and Phased
Recommendations .......................................................................... 16
Implementation Plan .......................................................................18
Financial Plan ..................................................................................19
Conclusion and Immediate Next Steps .......................................... 20
Page 53 of 126
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Introduction
The Franklin Transit Master Plan establishes a 10-year framework for improving public
transportation in the City of Franklin. The study evaluates existing transit service, identifies
mobility needs, develops improvement alternatives, and phases recommended actions into
an implementation program supported by a financial plan. The project scope directs the
study to produce a vision-based guide for the Franklin Transit Authority, evaluate service
delivery options and scenarios, and develop a fiscally constrained plan that addresses local,
regional, and inter-regional travel needs.
Franklin continues to grow as both a residential community and a major employment center
within the greater Nashville region. The city’s population in 2025 was estimated to be 93,921
and is projected to grow to 102,996 by 2030 and 122,266 by 2040. Employment remains
concentrated in Downtown Franklin, Cool Springs, and other major corridors. These trends
increase travel demand and strengthen the need for a transit system that improves access to
jobs, schools, medical services, shopping, and regional destinations.
The Transit Master Plan was built from four main inputs. First, the project team conducted
prolific public outreach to understand rider experience, unmet mobility needs, and
community priorities. Second, the team evaluated existing conditions, including
demographics, employment, land use, major activity centers, travel demand, multimodal
conditions, and current transit service. Third, the team worked with the Transit Master Plan’s
Technical Advisory Group and the Franklin Transit Authority Board to define goals, objectives,
and performance measures. Fourth, the team used those findings to identify transit needs,
develop alternatives, phase recommendations, and prepare the implementation and financial
plans.
Franklin Transit already provides important local mobility, but the current system does not
fully match the city’s growth, travel patterns, or public expectations. Current riders depend
on the service for essential trips. Many non-riders know transit exists but do not see the
current system as easy to use or relevant to the trips they make. The Plan therefore focuses
on practical improvements that strengthen the existing system, reduce barriers to use,
improve customer understanding, and support better service decisions over time.
2
Page 54 of 126
3
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Modernize the System Through
Technology Reduce Rider Barriers Improve Public Awareness and
System Understanding
Technology provides the framework for system
modernization. The Plan treats technology as
a core investment, not a standalone upgrade.
Mobile fare payment, open-loop payment,
real-time information, upgraded scheduling and
dispatch tools, Automatic Passenger Counters,
and performance dashboards support a
more modern transit operation. These tools
improve customer access, strengthen internal
management, and create better information for
future planning decisions.
The implementation plan places several of these
actions in the near term because they support
later service and investment decisions. Franklin
Transit needs better information systems to
manage future growth, measure performance,
and evaluate where service improvements will
have the strongest effect. The Plan therefore
uses technology to strengthen both the rider
experience and agency decision-making.
The Plan also focuses on reducing barriers that
make transit harder to use. Riders need easier
ways to pay fares, better information on where
vehicles are, and clearer guidance on how
the system works. The located public process
identified these issues repeatedly. Non-riders and
occasional riders said limited fare payment options
create a barrier to use. Riders and community
members also called for clearer information and
easier customer tools.
The recommended actions respond directly to
those concerns. Mobile fare payment and open-
loop payment will give riders more convenient
payment options. Real-time information and
upgraded tracking tools will make service more
visible and predictable. Better schedules, maps,
wayfinding, and customer communications will
make the system easier to understand. These
actions support current riders and make the
system easier for occasional riders and non-riders
to use.
Franklin Transit must improve public awareness
if it expects the system to grow. The outreach
process showed that many residents know transit
exists, but fewer understand where service
goes, how it works, or how to use it. Limited
understanding of routes, fares, and service options
remains a system need, not just a marketing issue.
The Plan addresses that issue through outreach,
communications, branding, and rider education.
Franklin Transit identified broad awareness, public
outreach strategy, social media presence, annual
outreach events, and rebranding of Transit on
Demand (TODD) as key tactics. The Plan also calls
for a public outreach and communications strategy
and for updates to customer-facing materials as
service changes occur.
Implementing these strategies is crucial because
service improvements alone will not increase use
if the public does not understand what service
exists, how it works, or how future changes
will improve mobility. Franklin Transit must
communicate service clearly and consistently
throughout implementation.
Key Themes
Page 55 of 126
4
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Key Themes
Use Microtransit as Improved
On-Demand Service
Expand Service Based on
Better Data and Performance
The Plan introduces microtransit as an improved on-
demand service that complements the fixed-route
network. Implementing microtransit is not intended
as a replacement for all fixed-route service, but
rather as a flexible transit option for areas, trip
types, and travel markets that traditional fixed-route
service cannot serve efficiently.
Public input received throughout the planning
process supports that balanced approach. Overall,
public workshop participants preferred expanding
fixed-route service just as much as they preferred
expanding on-demand service. That result supports
a system that uses both service types rather
than relying on only one. The goals and tactics
reinforce that direction by calling for microtransit to
complement fixed-route service where traditional
transit is less effective.
The Plan advances this concept by way of a
feasibility study, a technology assessment, and
piloting microtransit service in Cool Springs,
followed by phased expansion if performance
supports it. That implementation sequence allows
Franklin Transit to test the service model, evaluate
results, and refine future deployment before further
expanding the service.
The Plan ties future service expansion to more
comprehensive data, contemporary technology,
and routine performance review. Franklin Transit
cannot expand service span, coverage, frequency,
or regional connections effectively without more
robust information on how the system performs
and where demand is strongest. The Plan therefore
emphasizes Key Performance Indicator (KPI)
tracking, internal and public dashboards, annual
reassessment of performance goals, annual
adjustment of operating parameters, and a periodic
refresh of the performance improvement program.
The implementation framework follows the same
logic.
The Plan places foundational technology, planning,
and performance actions early in the program,
while gradually phasing larger service and capital
improvements over the 10-year planning horizon.
Franklin Transit can then use better data to guide
decisions on service span, frequency, route design,
microtransit expansion, and regional connections.
4
Page 56 of 126
5
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Planning Process
The Franklin Transit Master Plan followed a structured development process that moved from coordination
and public outreach through technical analysis, goal setting, and development of recommendations. The
study team incorporated public input, existing conditions data, an existing service analysis, and a budget
review resulting in the identification of transit needs, evaluation of transit improvement alternatives, and
the phasing of recommendations into a 10-year implementation framework. This process ensured that the
final plan reflected community priorities, technical findings, and implementation realities. The following
graphic summarizes the study sequence from project coordination and public engagement through technical
analysis, policy development, and phased plan development.
Coordinate
Project Management
Analyze
Existing Conditions Analysis
Develop Plan
Transit Plan Development
01
03
05
Engage
Public Involvement
Set Direction
Goals and Performance
Framework
Finalize Plan
Final Documentation
02
04
Page 57 of 126
6
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Existing Transit Service
and Existing Conditions
Franklin Transit currently operates two fixed
routes, TODD demand-response service, and
several special services.
The Red and Blue routes connect Downtown
Franklin, the Franklin Transit Center,
Williamson Medical Center, Columbia State
Community College, Cool Springs, retail
destinations, and employment centers. TODD
expands mobility for riders who live outside
the fixed-route network or need more flexible
trip scheduling. Franklin Transit also operates
limited special and pilot services tied to local
events and targeted travel needs. Together,
these services provide essential mobility,
but the current system remains limited in
service span, geographic coverage, customer
information, fare payment options, and
regional connectivity.
Page 58 of 126
7
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Population and Employment
Franklin continues to grow as both a
residential community and an employment
center within the greater Nashville region.
Population and household growth will
increase demand for travel during the
planning period. The strongest current and
future transit markets remain concentrated
in Downtown Franklin, Cool Springs,
and major corridors such as Columbia
Avenue, Murfreesboro Road, and Mack
Hatcher Parkway. These areas contain the
city’s highest concentrations of activity,
employment, and travel demand and
therefore provide the strongest support for
transit investment.
Franklin also functions as a regional
employment center. Many Franklin
residents commute to Nashville and nearby
communities, while Franklin draws workers
from Nashville, Spring Hill, Murfreesboro,
Brentwood, and other surrounding areas. The
following graphics illustrate the population
and employment patterns that shape existing
and future transit demand in Franklin.
POPULATION
EMPLOYMENT
2025 2045
2025 2045
Page 59 of 126
8
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Traditional Transit Markets
The existing conditions analysis identified
both traditional and discretionary transit
markets. Traditional transit markets include
older adults, young adults, lower-income
households, and zero-vehicle households.
Considering those populations, the Transit
Orientation Index identifies areas with higher
concentrations of residents who are more
likely to depend on transit for daily travel.
These populations cluster most strongly in
central Franklin and along major corridors,
representing Franklin’s strongest traditional
transit markets and remain important for
service planning and equity considerations.
Rider survey results confirmed that many
current users depend on Franklin Transit for
essential mobility. Fixed-route riders tend to
have lower incomes, limited vehicle access,
and greater dependence on transit than the
citywide population. TODD riders show similar
dependence, especially for work and medical
trips.
Page 60 of 126
9
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Discretionary Transit Markets
The discretionary market refers to the
potential riders living in higher-density areas
in terms of housing and employment who
are served by transit and may choose to use
it despite having other mobility options. The
Density Threshold Assessment identifies
areas where higher employment and housing
densities create stronger conditions for
discretionary transit use. The discretionary
market is strongest in Downtown Franklin and
Cool Springs, where significant trip generation
due to high levels of employment and
commercial activity create ideal conditions
for fixed-route service. These areas provide
the strongest support for fixed-route transit
investment and help define where future
service should remain most direct and visible.
At the same time, Franklin includes lower-
density areas where traditional fixed-route
service may be less effective. This pattern
supports a balanced service strategy that uses
fixed-route transit in the strongest corridors
and more flexible options in areas with
dispersed travel demand.
Page 61 of 126
10
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Travel Flows
Understand travel patterns in Franklin,
regardless of transportation mode, is crucial
to understanding all potential travel demand
that could be accommodated by transit.
Estimated daily trips within Franklin reveals
specific travel patterns.
With areas shaded lighter blue representing
lower trip densities and areas shaded darker
blue representing higher trip densities, the
highest daily trip densities occur within
Downtown Franklin and the Cool Springs area,
reflecting the concentration of employment,
commercial, and institutional destinations
that generate two-way travel throughout
the day. Additional clusters of activity are
evident along Columbia Avenue, Murfreesboro
Road, Mack Hatcher Parkway, and adjacent
neighborhoods, emphasizing these corridors
as the city’s primary commuting corridors.
Together with the activity center analysis,
these travel patterns confirm the importance
of Downtown Franklin, Cool Springs, and the
major corridors that connect them.
Page 62 of 126
11
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Existing Ridership
Existing ridership patterns show where
Franklin Transit currently captures the
strongest demand and where service
improvements may have the greatest impact.
Franklin Transit has experienced steady
ridership growth since COVID, and FY25
saw total ridership top 100,000. This shift
demonstrates a balanced growth pattern,
with both fixed route and TODD contributing
significantly to overall ridership, reflecting
the community’s need for reliable scheduled
routes as well as flexible demand response
options.
Stop-level ridership data shows that most
passengers use a small number of major
stops, while many neighborhood stops see
light activity. The Franklin Transit Center is the
busiest location, followed by Independence
Square. Other stops experiencing moderate
ridership include Fieldstone Farms, Walmart,
CVS on Liberty Pike, and the CoolSprings
Galleria.
35,113
25,653
18,298
33,699
28,840
22,565
41,427
38,609
19,968
FY 2023 FY 2024 FY 2025
100,000
80,000
60,000
40,000
20,000
0
Total Fixed Route Trips
Total Special Service Trips
Total Demand Response 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025
120,000
90,000
60,000
30,000
0
FRANKLIN TRANSIT RIDERSHIP BY MODE FRANKLIN TRANSIT RIDERSHIP OVER TIME
100,004
85,10482,255
73,541
82,604
77,620
82,794
69,941
41,965
67,671
82,576
Page 63 of 126
12
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Public Involvement
Public involvement played a central role in the Franklin
Transit Master Plan. The study team designed the
outreach program to gather input from riders, non-
riders, stakeholders, community partners, transit
staff, and local leaders. This process informed the
understanding of how the current system performs,
what mobility needs remain unmet, and the
community’s vision for Franklin Transit. The outreach
also provided local context that the technical analysis
alone could not provide, including day-to-day travel
challenges, service expectations, and perspectives
on how transit should support Franklin’s growth and
quality of life.
The public involvement program used a range of
methods to gather input from riders, non-riders,
stakeholders, community partners, transit staff, and
local leaders. Outreach included a Public Involvement
Plan, Technical Advisory Group meetings, stakeholder
interviews, discussion groups, community workshops,
rider surveys, a TODD rider survey, a virtual public
survey, staff input, and digital outreach. Together, these
efforts gave the study both broad community input and
detailed feedback on current service, unmet mobility
needs, and future priorities.
400+
Public Input Surveys
22
TODD Rider Surveys
97
Fixed Route Rider Surveys
24
Transit Operator and
Staff Surveys
12
Stakeholder Interviews
30
Discussion Groups
6
Public Workshops/
Meetings
63,000+
Social Media Interactions
1,300+
Virtual Room Visits
Page 64 of 126
13
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
These findings shaped the Plan’s emphasis on
stronger service, better customer tools, improved
public awareness, and a balanced mix of fixed-
route and on-demand service.
The virtual public survey broadened the outreach
to include a wider segment of the Franklin
community, including many residents who do not
currently use transit. This survey confirmed that
most respondents know transit exists in Franklin,
but fewer understand where the service goes
or how it works. Many respondents said they do
not ride because current routes do not serve the
destinations they need or because they prefer to
drive. Even so, the survey showed strong support
for transit improvements.
Digital outreach expanded the reach of the study
and helped maintain transparency throughout the
process. Social media, online materials, and the
virtual meeting room gave residents continued
access to project information and created
additional opportunities for participation. This
effort reinforced another key theme of the Plan:
Franklin Transit must improve awareness, visibility,
and public understanding if it expects the system
to grow beyond its current rider base.
74%
52%
56%
45%
Surveyed riders rated Franklin Transit as
critical to their ability to get around
Riders indicated the bus is their only way to
get around
General population aware of Franklin Transit,
but do not know where it goes or how to use it
Described themselves as discretionary
users, showing Franklin Transit serves both
dependent and choice riders
More routes/service
Increased frequency
Longer service span
Better bus stop amenities
Alternative payment
methods
Clearer rider information
Riders Needs/Wants
SUMMARY OF FINDINGS
Page 65 of 126
14
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Goals, Objectives, and
Performance Metrics
The Franklin Transit Master Plan establishes a policy framework to guide transit
improvement over the next 10 years. The study team developed this framework
through a joint workshop with the Technical Advisory Group and Franklin Transit
Authority Board, then refined it based on staff and TAG review. The workshop
results showed broad support for a rider-focused approach that emphasizes
usability, access, reliability, technology, and practical improvements that
Franklin can implement within the Plan horizon. Participants also highlighted
the need to strengthen local and regional connectivity, improve public
awareness, and continue supporting transit-dependent riders.
The final framework organizes the Plan around four goals. These goals focus
on rider awareness and experience, accessible mobility, local and regional
connectivity, and performance-based management of the transit system. The
following graphic summarizes those goals. Together, these goals establish the
policy direction for service, capital, technology, and management decisions
over the 10-year plan horizon.
The Plan also defines strategies and tactics to carry out these goals. These
actions include public outreach and education, social media and branding
improvements, mobile and open-loop fare payment, employer and healthcare
partnerships, reduced fare programs, bus stop improvements, microtransit
implementation, regional trip planning integration, local mobility hubs,
stronger scheduling and dispatch tools, internal and public dashboards, a
Comprehensive Operations Analysis, and recurring performance reviews.
Improve Rider
Awareness and
Experience
Provide Excellent
Management and
Oversight of the Public
Transportation System
Strengthen
Connectivity to
Local and Regional
Destinations
Provide Accessible
Mobility for All
Residents and
Visitors
FRANKLIN TRANSIT GOALS
The Franklin Transit Authority connects people and
places by providing efficient, effective, and affordable
transportation services.
“
“
FRANKLIN TRANSIT MISSION STATEMENT
Page 66 of 126
15
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Key Performance Indicators
To support implementation, the Plan establishes a performance monitoring framework based on Key Performance Indicators
(KPIs). The framework tracks safety, reliability, ridership growth, productivity, customer experience, and cost efficiency across
fixed-route, microtransit, and ADA paratransit services. Recommended KPIs include preventable collisions, revenue miles
between failures, total system ridership growth, passenger trips per revenue hour, fixed-route on-time performance, percent
of demand-response trips completed, customer concerns, customer commendations, operating expense per passenger trip,
and percent of calls answered within one minute. The Plan calls for monthly tracking, dashboard reporting, Franklin Transit
Authority Board review, quarterly reporting to the City’s Board of Mayor and Aldermen, and annual review of KPI thresholds.
This framework gives Franklin Transit a structured basis for measuring progress and using performance results to guide future
service and investment decisions. The following graphic summarizes the core performance areas Franklin Transit should track
to support implementation and accountability.
CONCEPTUAL FRANKLIN TRANSIT KPIs
Safety Reliability Ridership and
Productivity
Customer Experience Cost Efficiency
Preventable collisions per
100,000 vehicle miles
Revenue miles between
vehicle failures
Total system ridership
growth Customer concerns Operating expense per
passenger trip
Fixed-route on-time
performance
Passenger trips per
revenue hour Customer commendations
Percent of demand-
response trips completed
Calls answered within one
minute
Page 67 of 126
16
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Outreach and
Communication
Improvements
Planning and Policy
Development
Capital and
Technology
Improvements
Transparency
and Performance
Monitoring
Service
Improvements
Transit Needs, Improvement Strategy,
and Phased Recommendations
The Franklin Transit Master Plan uses public input, existing conditions
analysis, service evaluation, and latent demand analysis to identify
mobility gaps and develop a coordinated set of transit improvements.
The study identified several consistent needs across the system: broader
fixed-route coverage, stronger regional connectivity, longer service
hours, better frequency and reliability, a balanced mix of fixed-route and
on-demand service, better bus stop amenities, improved pedestrian
access, stronger customer information and marketing, and more
convenient fare payment options. The study also found a need to better
coordinate transit with broader transportation and land use planning in
Franklin.
The Plan phases these improvements over a 10-year period. Ongoing
actions support routine performance monitoring, maintenance, policy
updates, and recurring evaluation of service outcomes. Short-term
recommendations focus on practical near-term actions that improve
the rider experience and establish the foundation for future phases,
including planning work, customer tools, technology upgrades, and
early service concepts. Medium-term recommendations advance larger
service, capital, and technology improvements that require additional
planning, coordination, or funding, such as expanded service span,
a downtown circulator, bus stop upgrades, and targeted microtransit
expansion. Long-term recommendations focus on broader system
growth, including new local routes, higher fixed-route frequency,
Sunday service, wider microtransit coverage, and stronger regional
connections. This phased structure gives Franklin Transit a practical path
for implementation while allowing the City to adjust priorities based on
funding, performance, and changing community needs over time.
Together, these categories connect the identified transit needs to a coordinated set of
service, capital, technology, policy, and communications actions.
The following map illustrates the potential long-term transit network that could emerge as
Franklin implements the phased recommendations over the 10-year planning horizon. The
map highlights how fixed-route and microtransit improvements could work together over
time to expand mobility across Franklin.
CATEGORIES OF RECOMMENDATIONS
Page 68 of 126
17
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
POTENTIAL 10-YEAR BUILD
OUT OF TRANSIT NETWORK
Page 69 of 126
18
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Implementation Plan
The Franklin Transit Master Plan organizes implementation as a phased 10-year
program of service, capital, technology, planning, and policy actions. The Plan
begins with foundational work such as planning studies, policy development,
technology upgrades, and system readiness. It then advances into phased
service and capital improvements, followed by continued performance
monitoring and periodic plan updates. This structure gives Franklin Transit
a clear path for implementation while allowing the City to adjust timing
and priorities as conditions change. The following graphic summarizes the
implementation cycle that will guide Franklin Transit as it initiates, delivers,
monitors, and updates improvements over the 10-year planning period.
This cycle shows that implementation is continuous. Franklin Transit will
initiate improvements, implement priority actions, monitor results, and refresh
priorities over time based on performance findings, funding availability, and
changing community needs.
Implementing the Transit Master Plan’s vision will require identifying future
funding to support the expansion of fixed-route and citywide microtransit
services and the associated increase in operating costs. Short-term investments
in microtransit and technology improvements in the first five years can be
supported with existing funding. Future planning efforts, which are also already
funded, will be necessary to advance the recommendations outlined in this
plan. As a long-range planning document, the Transit Master Plan is intended to
guide future decision-making and may be updated as conditions, priorities, and
community needs evolve. The timing, scale, and implementation of individual
recommendations will depend on the availability of future funding and other
necessary resources.
Initiate
Establish the planning,
policy, funding, and
readiness actions needed to
support implementation.
01
Implement
Advance service, capital,
technology, and customer-
facing improvements based
on identified priorities.
02
Refresh
Update priorities, refine
actions, and incorporate
performance findings into
the next round of planning
and decision-making.
04
FRANKLIN TRANSIT IMPLEMENTATION CYCLE
Monitor
Track performance,
evaluate outcomes, and
assess operational needs,
customer response, and
service effectiveness.
03
The first phase of the Transit Master Plan can be
implemented with anticipated budget funding.
Page 70 of 126
19
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
Financial Plan
The financial plan supports this phased program with 10-year
projections for operating, capital, and planning costs. Operating
expenses account for the largest share of total projected costs
because they include both the continuation of existing services
and phased service expansion. Over five years, the Plan projects
approximately $25.7 million in operating costs, $5.35 million in
capital costs, and about $0.71 million in planning and other costs,
for a total of about $31.7 million. Over 10 years, the Plan projects
approximately $72.8 million in operating costs, $13.9 million in
capital costs, and about $1.07 million in planning and other costs,
for a total of about $87.8 million.
The Plan also reviews Franklin Transit’s current funding structure
and identifies potential future funding sources. Current operating
revenue depends heavily on federal and local funding, with
smaller contributions from state funds and limited revenue from
fares. Capital investments also rely heavily on federal funds,
especially Section 5307. The funding assessment identifies
additional federal, state, MPO, and local funding opportunities
that could support implementation, including programs that
support vehicles, facilities, microtransit, planning, and operating
assistance. Together, the implementation and financial plans
provide a structured framework for advancing improvements
while recognizing that actual implementation will depend on
funding availability, future studies, and performance results over
time.
Operating expenses account for the largest share of total
projected costs, while capital and planning expenses support
phased system expansion and modernization.
Fiscal Years Ten-Year Cost
OPERATIONS
Existing Blue and Red routes 2027-2036 $14,818,000
Existing special services 2027-2036 $5,596,000
Extended fixed route service span 2029-2036 $3,281,000
Downtown shuttle/circulator 2028-2036 $2,194,000
New local fixed routes 2032-2036 $5,193,000
Increased fixed route frequency 2034-2036 $5,417,000
Sunday fixed route service 2034-2036 $1,313,000
Traditional TODD service (assuming full MOD implementation) 2027-2036 $16,137,000
Cool Springs MOD 2027-2036 $5,739,000
Central Franklin MOD 2030-2036 $6,566,000
Citywide MOD 2032-2036 $6,521,000
CAPITAL
Vehicle Purchases 2027-2036 $11,394,000
Bus stop improvements 2027-2036 $397,000
Bus stop shelters 2027-2036 $1,918,000
Upgrade real-time information and tracking, scheduling, and dispatch tools 2027 $15,000
Install Automatic Passenger Counters (APCs) across the entire fixed route fleet 2027 $115,000
Implement Wi-Fi across the entire fleet 2028 $25,000
Launch mobile fare payment 2027 $3,000
Open-loop payment 2029 $54,000
PLANNING
ADA Transition Plan 2027 $40,000
Microtransit feasibility and technology assessment 2027 $200,000
Development of design standards 2027 $60,000
Development of bus stop guidelines 2028 $72,000
Comprehensive Operations Analysis (COA) 2029 $159,000
Integrated Capital Improvement Plan and Transit Asset Management Plan 2029 and 2033 $91,000
Refresh Transit Master Plan 2031 $134,000
Update Transit Master Plan 2036 $312,000
Page 71 of 126
20
Franklin Transit Master Plan | Executive Summary FRANKLIN
TRANSIT
Conclusion and Immediate Next Steps
The Franklin Transit Master Plan also establishes a practical path forward.
SHORT-TERM RECOMMENDATIONS MEDIUM-TERM RECOMMENDATIONS LONG TERM RECOMMENDATIONS
Short-term recommendations center on the planning
and system-readiness actions identified for 2027 and
2028.
Medium-term recommendations focus on
foundational improvements.
Long-term recommendations focus on
enhancing service capacity, coverage, and
regional connectivity to support future
growth.
Key actions include:
• Microtransit feasibility and technology
assessment
• ADA Transition Plan
• Development of service design standards
• Development of bus stop guidelines
• Upgrades to real-time information, scheduling,
and dispatch tools
• Installation of Automatic Passenger Counters
• Launch of mobile fare payment
Key actions include:
• Technology
• Customer tools
• Planning
• Performance monitoring
Key actions include:
• Expand service
• Strengthen regional connections
• Improve infrastructure
• Introduce flexible service options like
microtransit
Together, these efforts establish the policy,
technology, and operational foundation needed
to support more data-driven service planning and
future implementation. The microtransit feasibility
and technology assessment is especially important
because it will guide the design and launch of Franklin
Transit’s first technology-enabled microtransit zone
in Cool Springs and create a practical path toward
broader deployment over time.
This structure allows Franklin Transit to improve the rider experience now while building the
information, capacity, and partnerships needed for longer-term system growth.
Page 72 of 126
21
Franklin Transit Master Plan | Executive SummaryFRANKLIN
TRANSIT
The City of Franklin should use this plan as a
guiding framework rather than a fixed program
of action. Funding availability, future studies,
performance findings, and changing community
priorities will influence implementation over time.
As Franklin Transit collects better data, applies
new technology, and reassesses system needs,
the City can refine the timing, scope, and
prioritization of recommended actions throughout
the planning period. In that way, the Transit
Master Plan provides both direction and flexibility
as Franklin advances a stronger and more
modern transit system.
Page 73 of 126
Prepared by
FRANKLIN
TRANSIT
708 Columbia Ave
Franklin, TN 37064
(615) 628-0260
www.franklintransit.org
Page 74 of 126
RE
SOLUTION 2026-33
A R
ESOLUTION OF THE FRANKLIN TRANSIT AUTHORITY TO ADOPT THE 2026 TRANSIT MASTER PLAN
WH
EREAS, the City of Franklin is one of the fastest g rowing communities in the State of
Tennessee and has experienced continual growth and development since the 1980s; and
WH
EREAS, this growth pattern is expected to continue and to place increasing demands on the
City's transportation network; and
WH
EREAS, pursuant to Tennessee Code Annotated (T.C.A.) § 13-4-201, it is the function and
duty of the Franklin Municipal Planning Commission (FMPC) to adopt an official general plan for the
physical development of the City of Franklin; and
WH
EREAS, the FMPC may from time to time amend, extend or add to the plan or carry any
part of subject matter into greater detail; and
WHEREAS, the Transit Master Plan serves as a long-range plan for the transit system based on
existing and proposed land uses; and
WHEREAS, the 2026 Transit Master Plan provides recommendations and a vision -based
guide for the Franklin Transit Authority, including a 10 -year plan for capital investments and
recommendations for serving transportation mobility needs of Franklin; and
WH
EREAS, the Franklin Transit Authority believes it is in the best interest of the City of Franklin
to adopt the 2026 Transit Master Plan.
NOW,
THEREFORE, BE IT RESOLVED BY THE FRANKLIN TRANSIT AUTHORITY OF THE CITY OF
FRANKLIN, TENNESSEE, AS FOLLOWS:
Th
e 2026 Transit Master Plan, entitled “Franklin Transit Master Plan,” is hereby adopted as
recommended by the Franklin Transit Authority in BAI-8-4-26A, FMPC in Resolution 2026-26, and the City
of Franklin Board of Mayor and Aldermen in Resolution 2026 -27, along with the accompanying maps,
exhibits, policies, and proposed projects listing.
IT
IS SO RESOLVED AND DONE on this ____ day of _______________, 20__.
AT
TEST: FRANKLIN TRANSIT AUTHORITY:
By
:_____________________________ By:___________________________
Max Baker John Schroer
Chai r of FTA
1
Law Dept approved (2) 06.15.26
Page 75 of 126
Approved as to Form:
By: _____________________________
Shauna R. Billingsley
City Attorney
2
Law Dept approved (2) 06.15.26
Page 76 of 126
FRANKLIN TRANSIT AUTHORITY
BOARD ACTION ITEM
Item Number: BAI 8-4-26B Meeting Date: 8-4-26
Item Title: Consideration of Amendment No. 2 to Agreement #2024-0302 to
provide supplemental Transit Master Planning activities related to transit
technology applications and new microtransit service introduction
________________________________________________
BACKGROUND
As part of the Franklin Transit Authority’s contract with Benesch for professional
services in connection with the FTA’s Transit Master Plan. The amendment adds
Fourty-nine Thousand Eight Hundred and Thirty-one and No/100 Dollars
($49,831.00) to the contract. The supplemental funds are to be used for the
development of the final microtransit pilot operating plan and related SaaS
platform technical specifications.
STAFF RECOMMENDATION
Staff recommends that the Franklin Transit Authority approve changes to Contract
#2024-0302.
________________________________________________
Approved _____________________________ _____________________
Board Officer Date
Page 77 of 126
AMENDMENT NO. 2 TO FTA OF FRANKLIN, TENNESSEE PROFESSIONAL SERVICES
AGREEMENT
COF Contract No. 2024-0302
ENTER
ED INTO by and between the CITY OF FRANKLIN, TENNESSEE (the “City”) and
BENESCH as of this ______ day of _____________, 20____.
RECITALS:
WHEREAS, the City and B ENESCH entered into an agreement (COF Contract No. 2024-0302)
dated June 3, 2025 (the “Agreement”); and
WHEREAS, the purpose of the Agreement was to provide engineering, related technical, and
other services in connection with FTA’s Transit Master Plan; and
WHEREAS, the parties desire to amend the agreement to provide supplemental Transit Master
Planning activities related to transit technology applications and new microtransit service introduction;
and
WHEREAS, the City and BENESCH desire to amend the Agreement as set forth herein.
NOW, THEREFORE, in consideration of these premises and the mutual promises contained
herein, it is agreed by and between the parties as follows:
1. The Agreement is hereby amended and restated as follows:
2. The Agreement is hereby amended to provide supplemental Transit Master Planning activities not
to exceed a fee of Forty-Nine Thousand Eight Hundred and Thirty-One and No/100 Dollars ($49,831.00).
3. The Agreement is hereby amended to include an additional scope, attached as Exhibit A to this
Amendment.
4. The Agreement is hereby amended to extend the project schedule through February 2, 2027.
5. Waiver. Neither party’s failure nor delay to exercise any of its rights or powers under this
Amendment will constitute or be deemed a waiver or forfeiture of those rights or powers. For a waiver of
a right or power to be effective, it must be in writing signed by the waiving party. An effective waiver of
a right or power shall not be construed as either (a) a future or continuing waiver of that same right or
power, or (b) the waiver of any other right or power.
6. Severability. If any term or provision of the Amendment is held to be illegal or unenforceable,
the validity or enforceability of the remainder of the Amendment will not be affected.
7. Precedence. In the event of conflict between this Amendment and the provisions of the previous
Agreement(s), or any other contract, agreement or other document to which this Amendment may
accompany or incorporate by reference, the provisions of this Amendment will, to the extent of such
conflict (or to the extent the Agreement is silent), take precedence unless such document expressly states
that it is amending this Amendment.
8. Entire Agreement. The Amendment between the parties supersedes any prior or
contemporaneous communications, representations or agreements between the parties, whether oral or
1
Law Dept approved 08.04.26
Page 78 of 126
written, regarding the subject matter of the entire Amendment. The terms and conditions of this
Amendment may not be changed except by an amendment expressly referencing this Amendment by
section number and signed by an authorized representative of each party.
9. Additions/Modifications. If seeking any addition or modification to the Amendment, the parties
agree to reference the specific paragraph number sought to be changed on any future document or
purchase order issued in furtherance of the Amendment, however, an omission of the reference to same
shall not affect its applicability. In no event shall either party be bound by any terms contained in any
purchase order, acknowledgement, or other writings unless: (a) such purchase order, acknowledgement,
or other writings specifically refer to the Amendment or to the specific clause they are intended to
modify; (b) clearly indicate the intention of both parties to override and modify the Amendment; and (c)
such purchase order, acknowledgement, or other writings are signed, with specific material clauses
separately initialed, by authorized representatives of both parties.
10. Breach. Upon deliberate breach of the Amendment by either party, the non-breaching party shall
be entitled to terminate the Amendment without notice, with all of the remedies it would have in the event
of termination, and may also have such other remedies as it may be entitled to in law or in equity.
11. Survival. This Amendment shall survive the completion of or any termination of the original
contract, revised contract, or agreement or other document to which it may accompany or incorporate by
reference.
12. All other provisions of the Agreement, dated June 3, 2025, are unchanged and remain in full force
and effect.
FRANKLIN TRANSIT AUTHORITY:
By: ____________________________________
John Schroer , Chairman
Date: ___________________________________
APPROVED AS TO FORM BY:
_______________________________________
Shauna R. Billingsley, City Attorney
BENESCH:
By: ________________________
Title: _______________________
Date: ______________________
2
Law Dept approved 08.04.26
Page 79 of 126
Franklin Transit Master Plan: Microtransit Implementation Planning and SaaS Platform Scope
Development Support
For purposes of this scope, references to Franklin Transit include City of Franklin staff and the
TMA Group in its role as the transit operator. Benesch will coordinate with both parties through
the City of Franklin Project Manager throughout development of the final microtransit pilot
operating plan and related SaaS platform technical specifications.
Draft Scope of Services
Project Purpose
The recently completed Transit Master Plan incorporates microtransit as a new delivery option for
meeting the mobility needs of the City. As a continuation of the Transit Master Plan services and
further development of the implementation plan element, this scope of work includes refinement
of the conceptual microtransit zone covering the Cool Springs area. Franklin Transit completed
the conceptual planning phase for this potential microtransit service and previously secured a
CMAQ grant for funding a 3-year pilot demonstration of this service. Benesch will advance the
concept and implementation plan efforts through two coordinated workstreams:
1. Develop a final microtransit operating plan
2. Prepare technical specifications for a microtransit Software-as-a-Service (SaaS)
platform
The final operating plan will define how the service will function, including the service zone,
service hours, booking policies, operating rules, fixed-route integration, general public demand-
response integration, and performance measures to ensure that the requirements necessary to
achieve the vision developed in the Transit Master Plan have been identified.
The SaaS technical specifications will translate the approved operating plan into vendor-neutral
system requirements for customer booking, automated scheduling, real-time dispatching, trip
optimization, vehicle and operator assignment, customer communications, data management,
reporting, and system administration.
This assignment will not include procurement administration, vendor evaluation, vendor
selection, contract negotiation, vehicle procurement, driver procurement, or turnkey
transportation operations.
Task 1: Project Management and Technical Coordination
Benesch will provide project management, technical coordination, schedule control, and
decision support throughout the assignment.
COF CONTRACT NO. 2024-0302
AMENDMENT NO. 2
EXHIBIT A
Page 80 of 126
Benesch will conduct a kickoff meeting with the Franklin Transit project team to:
• Confirm decision-making responsibilities
• Establish the project schedule
• Confirm deliverable review procedures
• Identify key operating and technical decisions
Regular coordination meetings (1 per month, 3 total) will be held with the Franklin Transit project
team.
Task 1 Deliverables
• Project kickoff meeting
• Project schedule
• Coordination meetings (1 per month, 3 total)
• Monthly progress updates
Task 2: Final Microtransit Operating Plan
Benesch will convert the conceptual planning completed for the 10-Year Transit Master Plan into
a final operating plan that defines how the microtransit service should function in practice.
The operating plan will establish the business rules, service parameters, service integration
approach, and performance expectations needed to configure the future SaaS platform.
Benesch will:
• Confirm the conceptual service zone and make limited refinements needed for
implementation.
• Define service days, service hours, peak and off-peak parameters, and initial vehicle
assumptions.
• Establish booking, pickup, wait-time, ride-time, shared-ride, cancellation, no-show, fare,
and customer eligibility policies.
• Define how microtransit will connect with Franklin Transit’s fixed-route network, including
transfer locations, first-mile and last-mile trips, and rules for direct versus transfer trips.
• Define how microtransit will interact with the existing general public demand-response
service, including customer classifications, booking channels, scheduling, dispatching,
vehicle assignment, fares, and reporting.
• Identify necessary interfaces with ADA paratransit while maintaining separate service
requirements and reporting.
• Develop planning-level operating assumptions for ridership, vehicle requirements,
productivity, wait time, ride time, and cost per trip.
Page 81 of 126
• Establish service KPIs and recommend initial performance targets.
Task 2 Deliverables
• Technical Memorandum 1: Final Microtransit Operating Plan
Task 3: Microtransit SaaS Technical Specifications
Benesch will translate the approved operating plan into vendor-neutral functional requirements
for a future microtransit SaaS platform. The requirements will define how the platform must
support Franklin Transit’s service model, operating rules, customer experience, scheduling and
dispatching needs, service integration, and reporting expectations. The requirements will focus on
desired outcomes and core functionality.
Benesch will develop requirements for:
• Customer trip booking
• Scheduling and dispatching
• Shared-ride trip assignment
• Driver and dispatcher functions
• Customer notifications
• Service-zone and operating-rule configuration
• Fixed-route coordination
• General public demand-response coordination
• Service performance reporting
Requirements will be organized as mandatory, preferred, optional, and future-ready to support
Franklin Transit’s future solicitation and pilot demonstration efforts. Any identified
incompatibilities or required system modifications will be documented but will not be resolved
under this study. Resolution will remain the responsibility of the applicable technology providers.
Task 3 Deliverables
• Technical Memorandum 2: Final SaaS technical specifications
Task 4: Final Report and Technical Specification Package
Benesch will consolidate the approved operating plan and SaaS technical specifications into a
final, coordinated project report.
The final report will clearly connect the recommended operating model to the required platform
capabilities, so Franklin Transit can use the document as the basis for a future SaaS solicitation.
Benesch will:
Page 82 of 126
• Prepare a draft final report that summarizes the recommended microtransit operating
model.
• Incorporate the complete SaaS technical specifications developed under Task 3.
• Confirm consistency between the operating plan and the platform requirements.
• Facilitate a project closeout meeting with the Franklin Transit project team to review the
final operating plan, SaaS technical specifications, key decisions, and next steps.
• Document and address Franklin Transit comments.
• Prepare final editable files for future procurement use.
Task 4 Deliverables
• Draft Report
• Final Report
• Project Closeout Meeting.
Proposed Three-Month Project Schedule
The schedule assumes a 12-week duration beginning with notice to proceed.
Task Month 1 Month 2 Month 3
Task 1 – Project Management and Coordination ● ● ●
Task 2 – Final Microtransit Operating Plan ● ●
Task 3 – Microtransit SaaS Technical Specifications
● ●
Task 4 – Final Report and Technical Specification Package
●
Task 1 will continue throughout the full three-month period. Tasks 2 and 3 will overlap so the
approved operating decisions can be translated directly into the SaaS requirements without
delaying the schedule.
Page 83 of 126
Proposed Budget
$227.71 $197.15 $293.60 $166.21 $140.58 $112.22 $91.90 Hours Fee
Task 1 Project Management and Coordination
6 12 4 6 6 0 6 40 $7,299
Task 2 Final Microtransit Operating Plan
12 16 12 20 24 12 2 98 $17,639
Task 3 Microtransit SaaS Technical Specifications
10 12 10 16 20 10 2 80 $14,356
Task 4 Final Report and Technical Specification Package
4 8 6 16 20 4 4 62 $10,537
Total Direct Labor (all tasks) 32 48 32 58 70 26 14 280 $49,831
Total Fee $49,831
Task Description
Benesch
Principal /
Sr Transit
Specialist
Project
Manager
Senior
Planner
Planner/
GIS
Admin
Coord.
Senior
Advisor
Project
Planner
Task Totals
Page 84 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 1 of 18
FRANKLIN TRANSIT AUTHORITY
PUBLIC TRANSPORTATION
Public Transportation Agency Safety Plan (PTASP)
Prepared in accordance with 49 CFR Part 673
The Franklin Transit Authority
708 Columbia Avenue, Franklin, Tennessee 37064
Update 4
Incorporating the 14-Measure Safety Performance Target Amendment, July 2026
(Supersedes Version 3, incorporating the 12/31/2022 amendment)
Page 85 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 2 of 18
Table of Contents
● 1. Transit Agency Information
● 2. Plan Development, Approval, and Updates
● 3. Safety Performance Targets
● 4. Safety Management Policy
● 5. Safety Risk Management
● 6. Safety Assurance
● 7. Safety Promotion
● Appendix A — Definitions and Acronyms
● Appendix B — Safety Program Self-Assessment Checklist
● Appendix C — Amendment Record
Page 86 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 3 of 18
1. Transit Agency Information
Under Part 673, a transit agency is required to maintain documents that describe its Agency Safety Plan (ASP),
including those related to implementation and results from processes and activities. This section identifies the
agency, its safety leadership, and the scope of service covered by this Plan.
Transit Agency Name The Franklin Transit Authority
Transit Agency Address 708 Columbia Avenue, Franklin, Tennessee 37064
Accountable Executive Debbie Henry, President and CEO — TMA Group
Chief Safety Officer / SMS Executive Stanton Higgs, Chief Operating Officer
Mode(s) of Service Covered by This
Plan
Fixed Route (Motorbus) and Demand Response
FTA Funding Types 5307, 5339
Mode(s) of Service Provided Fixed Route and Demand Response — Contracted
Fleet Size 16 vehicles in peak revenue service
Service Provided on Behalf of Another
Transit Agency?
No
Definition — Small Public Transportation Provider: A recipient or subrecipient of Federal financial assistance under 49
U.S.C. § 5307 with 100 or fewer vehicles in peak revenue service, that does not operate a rail fixed guideway system (49
C.F.R. § 673.5). At 23 vehicles, Franklin Transit Authority qualifies as a Small Public Transportation Provider, and is not
subject to the separate 8-measure Safety Risk Reduction Program, which applies only to Section 5307 recipients serving
an urbanized area of 200,000 or more.
Page 87 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 4 of 18
2. Plan Development, Approval, and Updates
Development and Approval
Entity That Drafted This Plan TMA Group — Contractor of Record for Franklin Transit Authority
Board Approval Julian Bibb, Franklin Transit Authority Chairman
Certification of Compliance Stanton Higgs, Chief Operating Officer
Supporting Documentation A copy of the Board Action Item is on file at the Franklin Transit Authority
offices, 708 Columbia Avenue, Franklin, TN 37064
Version History
Version Section(s) Affected Reason for Change Date Issued
1 New Document Initial issuance 07/20/2020
2 Sections 5 and 7
Board- and Safety Committee-approved amendment: added CDC
Guidelines to hazard identification, barriers around the bus
operator workstation, and mandatory de-escalation training, per
FTA and Bipartisan Infrastructure Law (49 U.S.C. 5329(d))
requirements
12/31/2022
3 Section 3 Documented existing Safety Performance Targets under the
original 7-measure National Safety Plan structure
12/30/2019
(template);
reaffirmed
annually
4 Section 3
Expanded Safety Performance Targets from 7 to 14 measures
per FTA's April 2024 National Public Transportation Safety Plan
update; added Vehicle Revenue Miles (VRM) basis for rate
calculations; set targets for new measures at industry-standard
excellence levels for a small, 23-vehicle Fixed Route / Demand
Response provider
07/21/2026
Safety Performance Target Coordination
Safety Performance Targets are evaluated over a fiscal year, with a baseline of Fiscal Year 2021 (7/1/2020–
6/30/2021).
Staff of the TMA Group and City of Franklin participate on the Transportation Technical Committee for the
Metropolitan Planning Organization (MPO) and the Tennessee Public Transportation Association. TMA Group, on
behalf of Franklin Transit, ensures that performance targets and any updates to the PTASP are communicated to the
MPO and TDOT, and benchmarks Franklin Transit's performance against comparable agencies regionally.
Page 88 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 5 of 18
Recipient Entity Name Date Targets Transmitted
State Tennessee Department of Transportation July 30, annually
Metropolitan Planning
Organization Greater Nashville Regional Council, MPO July 30, annually
Annual Review and Update
Annual Review will be conducted each July, and to be completed by July 31st. Franklin Transit designated safety staff
will review safety performance as it relates to meeting the documented safety goals. Safety staff will also review Risk
Assessments to reduce risk. After the review, staff will recommend new annual goals for approval by the Board.
Page 89 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 6 of 18
3. Safety Performance Targets
Specify performance targets based on the safety performance measures established under the National Public
Transportation Safety Plan. Pursuant to FTA's April 2024 update to the National Public Transportation Safety Plan (89
FR 25276), the general Safety Performance Measures required of all agencies subject to the PTASP regulation
expanded from 7 to 14. Franklin Transit Authority, as a Small Public Transportation Provider operating 23 vehicles
across Fixed Route and Demand Response service, is subject to all 14 general measures below and remains exempt
from the separate 8-measure Safety Risk Reduction Program, which applies only to large urbanized area providers
(200,000+ population).
Rate-based measures are calculated per 100,000 Vehicle Revenue Miles (VRM), consistent with National Transit
Database (NTD) reporting convention, unless otherwise noted.
3.1 Core Safety Performance Measures
Mode Fatalities (Total/Rate) Injuries (Total/Rate) Major Events / Safety Events
(Total/Rate) System Reliability
Fixed Route 0 / 0 3 / 1.4 3 / 1.4 17,000 mi
Demand Response 0 / 0 1 / 1.3 1 / 1.3 20,000 mi
3.2 New Measures — Collision, Transit Worker, and Assault Rates
Targets below are set at levels consistent with industry-recognized best practice for small transit systems (fewer than
25 vehicles) operating a mixed Fixed Route / Demand Response model, drawing on FTA's stated zero-tolerance
philosophy for fatality and severe-outcome measures, and peer-benchmarked rate levels for lower-severity, higher-
frequency measures. These targets will be reviewed against Franklin Transit's own 3-year NTD-reported data as it
becomes available and adjusted through the Plan's normal annual review process if warranted.
Measure Fixed Route Target Demand Response Target
Collision Rate (Total per 100,000 VRM) 1.4 1.3
Pedestrian Collision Rate (per 100,000 VRM) 0.0 0.0
Vehicular Collision Rate (per 100,000 VRM) 1.4 1.3
Transit Worker Fatality Rate (per 100,000 VRM) 0.0 0.0
Transit Worker Injury Rate (per 100,000 VRM) 0.5 0.4
Assaults on Transit Workers (Total, annual) 0 0
Rate of Assaults on Transit Workers (per 100,000
VRM) 0.0 0.0
3.3 Basis for New Measure Targets
Measure Group Target Basis / Rationale
Pedestrian Collision Rate;
Transit Worker Fatality Rate;
Rate of Assaults on Transit
Workers
Set to zero, consistent with FTA's zero-tolerance philosophy already applied to
Franklin Transit's Fatalities measure. These are severe-outcome events for which any
occurrence warrants immediate Safety Committee review under Section 5 (Safety
Risk Management), rather than treatment as a statistically expected occurrence.
Collision Rate / Vehicular
Collision Rate
Set using Franklin Transit's own FY2023-24 actual performance as the baseline (Fixed
Route: 4 collisions / 235,957 VRM = 1.70; Demand Response: 2 collisions / 143,862
VRM = 1.39). Because Collision Rate is a subset of the existing Safety Events Rate
measure (nearly all of Franklin Transit's reported Safety Events are collisions), the
Page 90 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 7 of 18
Measure Group Target Basis / Rationale
Collision Rate target is capped at the existing Safety Events Rate target -- 1.4 (Fixed
Route) and 1.3 (Demand Response) -- to keep the two measures internally consistent
rather than setting a Collision Rate target that numerically exceeds the broader
Safety Events ceiling it falls under. This still represents a real improvement target
relative to the FY2023-24 baseline (an 18% reduction on Fixed Route, a 6% reduction
on Demand Response), and is consistent with data reported by peer transit agencies
of comparable size and service mix. The Safety Committee will revisit this target once
three years of Franklin Transit's own NTD-reported Collision data is available. Note on
measure structure: Collision Rate (1.1) and Vehicular Collision Rate (1.1.2) are both
required under FTA's National Public Transportation Safety Plan and are not
redundant by design -- Collision Rate is the total of all collisions, while Pedestrian
Collision Rate (1.1.1) and Vehicular Collision Rate (1.1.2) are its two required sub-
components. Because Franklin Transit's Pedestrian Collision Rate target is set to zero,
Collision Rate and Vehicular Collision Rate happen to carry the same numeric value in
this Plan, but both rows are retained as separate measures consistent with the FTA
measure structure, and would diverge if a pedestrian collision were ever reported.
Transit Worker Injury Rate
Set at roughly one-third of the passenger Injury Rate target, consistent with industry
data showing transit worker injuries occur less frequently than passenger injuries in
small bus/paratransit operations, while remaining an active, monitored measure
rather than a zero target given the physical nature of operator duties.
Assaults on Transit Workers
(Total)
Set at zero as an aspirational excellence-level target appropriate for a small system.
Any assault should trigger the mandatory de-escalation training review and Risk
Assessment Matrix process already described in Sections 5 and 7 of this Plan,
consistent with the Plan's 2022 amendment adding mandatory de-escalation training
for customer-facing staff.
These targets represent Franklin Transit's initial, Board-approved starting point for the seven new measures and are set at
a deliberately rigorous, excellence-oriented level rather than a permissive one. The Safety Committee will formally revisit
each target once three years of Franklin Transit's own NTD-reported data is available, consistent with FTA guidance on
rolling-average target-setting, and may recommend adjustment through the Plan's normal annual review and
amendment process.
3.4 Safety Performance Target Coordination
The Safety Performance Targets listed above, Fatalities, Injuries, Safety Events, Collision Rates, Transit Worker
Fatality/Injury Rates, Assaults on Transit Workers, and System Reliability, will be evaluated over a fiscal year period
with a baseline year of Fiscal Year 2021 (7/1/2020–6/30/2021).
Staff of the TMA Group and Franklin Transit sit on the Transportation Technical committee for the Metropolitan
Planning Organization, as well as the Tennessee Public Transportation Association. The TMA Group on behalf of
Franklin Transit will ensure that Performance Targets and any updates to the PTASP will be communicated to the
MPO and TDOT. Comparisons with the Safety Performance of all Agencies will be done in order to compare the
performance of the Franklin Transit system to go over all goals throughout the region.
Targets Transmitted to the
State State Entity Name Date Targets Transmitted
Tennessee Department of Transportation July 30th, each year
Targets Transmitted to the
MPO Metropolitan Planning Organization Name Date Targets Transmitted
Greater Nashville Regional Council, MPO July 30th, each year
Page 91 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 8 of 18
4. Safety Management Policy
Safety Management Policy Statement
The Franklin Transit Authority is committed to Safety Management as a systematic and comprehensive approach to
identifying safety hazards and risk associated with transit system operations and related maintenance activities.
The Authority has adopted a Safety Management System (SMS) framework as an explicit element of its responsibility
— establishing safety policy; identifying hazards and controlling risks; and setting goals, planning, and measuring
performance. SMS fosters agency-wide support for safety by establishing a culture where management is held
accountable for safety and everyone in the organization takes an active role in securing transit safety.
This Plan has been developed and adopted to comply with FTA requirements established by Section 5329(d) of the
Moving Ahead for Progress in the 21st Century (MAP-21) Act, as amended by the Bipartisan Infrastructure Law.
Management and the Board of Directors have reviewed this Plan and assure that its contents meet the requirements
of Section 5329(d) through the establishment of a comprehensive SMS framework, including the expanded 14-
measure Safety Performance Target structure adopted in Update 4 of this Plan.
Fundamental Safety Beliefs
● Safety is a core business value.
● Safety excellence is a key component of our mission.
● Safety is a source of competitive advantage; safety excellence strengthens all public transportation activities.
● Accidents and serious incidents are preventable — they are preceded by identifiable precursors that can be
assessed and mitigated through physical, administrative, and behavioral defense strategies.
Basic Elements of the Safety Approach
● Top management commitment to safety
● Responsibility and accountability of all employees
● Clearly communicated safety goals
● Safety assurance and performance measurement for improvement
Debbie Henry, President and CEO, TMA Group, and Accountable Executive
Policy Communication
The Compliance Director, who leads Franklin Transit SMS activities, introduces staff to SMS principles at an all-staff
meeting. The Safety Management Policy Statement is distributed to every employee as a handout at this meeting and
posted throughout employee gathering areas at Franklin Transit facilities. Review and distribution of the Policy
Statement is incorporated into new-hire training and annual refresher training for all staff.
Safety promotion is critical to the success of the SMS, ensuring the organization fully understands and trusts the
safety policies, procedures, and structure. Training is delivered through narratives, webinars, informal staff meetings,
courses, conferences, and formal certifications, guided by an annual (January–December) training calendar for all
staff, operations personnel, management, and the Safety.
Page 92 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 9 of 18
Authorities, Accountabilities, and Responsibilities
Role Responsibilities
Accountable Executive (Debbie
Henry)
Responsible for ensuring the Board-approved PTASP is executed as intended;
leads the organization's commitment to safety; carries out the Agency Safety Plan
and Transit Asset Management Plan; controls the human and capital resources
needed to develop and maintain the ASP; accountable for effective SMS
implementation and correcting substandard performance. Delivers an annual
report to the Board on safety goal achievement and future initiatives.
Chief Safety Officer / SMS
Executive (Stanton Higgs)
Manages communication and implementation of the SMS agency-wide; supports
managers and key staff in building a safety culture; keeps training on schedule;
reports directly to the Accountable Executive.
Agency Leadership (Monte
Rodriguez, Compliance Director)
Coordinates PTASP implementation, promotes safety awareness, communicates
changes in safety documents, serves as main point of contact for safety concerns,
monitors corrective-action effectiveness, ensures documentation accessibility,
provides periodic performance reports, and renders independent safety advice to
leadership.
Key Staff (Mike Johnston, Transit
Director)
Advises and assists drivers in identifying and reporting suspicious activity,
managing security incidents, and responding to emergencies.
Drivers, Operation Dispatchers
Responsible for exercising maximum care and good judgment in identifying and
reporting suspicious activities, managing security incidents, and responding to
emergencies.
Employee Safety Reporting Program
Effective hazard identification is fundamental to safety management at Franklin Transit. Identification methods may
be reactive (occurrence reporting, incident investigation, trend monitoring) or proactive (observing and analyzing day-
to-day operations). Reporting methods include:
● Safety meetings
● Hazard, incident, and accident reports
● Confidential safety suggestion box for drivers
● Informal discussion with staff
Hazard identification is only successful within a non-punitive, just safety culture. The Authority pursues systematic
safety improvements by discovering and learning from potential weaknesses in the system's safety.
Non-Punitive Reporting Policy
Franklin Transit Authority does not take disciplinary action against any employee who discloses an incident or
occurrence involving transit safety, including near misses, provided the report comes from the employee and does
not involve an illegal act or a willful disregard of established regulations or procedures. To the extent permissible by
law, the identity of any employee who provides safety information is protected.
Page 93 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 10 of 18
5. Safety Risk Management
Safety Hazard Identification
Effective hazard identification programs are fundamental to safety management. Identification may be reactive
(occurrence reporting, incident investigation, trend monitoring) or proactive (observing and analyzing day-to-day
operations). Franklin Transit's methods include:
● Safety assessments
● Trend monitoring
● Safety meetings
● Hazard, incident, and accident reports
● Safety audits
● Customer suggestions and complaints
● Confidential driver suggestion box
● FTA, NTI, DHS, FEMA, and TEMA resources
● CDC Guidelines
Safety Risk Assessment
Once hazards are identified, the Authority assesses potential consequences considering likelihood of occurrence,
severity, and exposure. Risk is assessed by experienced personnel using a Risk Assessment Matrix (RAM) at the
direction of the Director of Compliance. Each qualified individual completes the assessment independently; results
are then discussed and a final group Risk Assessment Matrix and assignment are agreed upon.
If risk is acceptable, the hazard is monitored. If unacceptable, the Authority acts to lower risk to an acceptable level or
to remove or avoid the hazard. Recommended actions are documented and communicated to the Accountable
Executive, and directives to execute are passed to appropriate staff.
Risk Mitigation
Hazards requiring mitigation are tracked in a Hazard Identification and Risk Assessment Log to help prioritize safety
risks. Risk is lowered by reducing severity of potential consequences, reducing likelihood of occurrence, and/or
reducing exposure. Mitigation actions fall into three categories:
Physical Defenses Administrative Defenses Behavioral Defenses
Engineered objects and technologies
that discourage, warn against, or
prevent inappropriate action, or
mitigate consequences (e.g., traffic
control devices, fencing, safety
restraints, control/signal systems,
monitoring systems). Barriers around
the bus operator workstation.
Procedures and practices that reduce
the likelihood of an accident or
incident (e.g., safety regulations,
standard operating procedures,
personnel proficiency, supervision,
inspections, training).
Education and public-awareness
interventions aimed at reducing risky
or reckless behavior of motorists,
passengers, and pedestrians —
factors outside the agency's direct
control.
Once hazards are identified and risk levels assessed, they are entered into a Prioritized Safety Risk Log, which records
priority level, risk description, planned mitigation strategy, outcome, responsible staff, timeline, and status. The Log is
updated frequently to ensure continual progress toward risk reduction.
Page 94 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 11 of 18
Safety Risk Assessment Matrix (RAM)
Risk is assessed using a severity/likelihood matrix. Each hazard is scored for Severity (1–5, considering people, assets,
environment, and reputation) and Likelihood (1–5), yielding an Assessed Risk Level of Low, Medium, or High:
● Low Risk — Continuous improvement
● Medium Risk — Monitor and control
● High Risk — Unacceptable / intolerable; introduce further control measures immediately
Page 95 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 12 of 18
6. Safety Assurance
Safety assurance provides the feedback necessary to confirm the SMS is functioning effectively and that Franklin
Transit is meeting or exceeding its safety objectives. This requires a clear understanding of how safety performance
will be evaluated, and embedding the resulting metrics into the organizational culture to drive ongoing improvement.
Defining Safety Goals and Objectives
Setting safety goals and objectives is part of strategic planning and safety policy. A safety goal is a general description
of a desirable long-term impact. A safety objective is a more specific, measurable statement supporting that goal,
each measured against specific performance metrics with a defined baseline and target.
Performance Measurement and Verification
Consistent with the expanded 14-measure structure in Section 3, actual performance against all Safety Performance
Targets is verified annually by cross-referencing Franklin Transit's Safety Events, injury, assault, and fatality records
against Vehicle Revenue Miles (VRM) as reported to the National Transit Database, and by cross-referencing
maintenance and road-call records against VRM to calculate System Reliability. This analysis is compiled into an
annual Safety Performance Report for review by the Safety Committee ahead of the July annual review described in
Section 2, and is retained on file separately from this Plan as supporting documentation.
Monitoring Mitigation Effectiveness
● Security cameras in vehicles and public areas
● Geotab Automatic Vehicle Location (AVL) monitoring of location and speed
● Safety meetings and employee / customer suggestion boxes
● Staff feedback and incident reports / incident log review
Regular monthly safety meetings review risk mitigation plans and all internally reported data to monitor
effectiveness. The committee determines whether to leave a mitigation plan as is, adjust it, or develop a new
strategy, incorporating feedback from operations staff on effectiveness.
Investigating Safety Events
Franklin Transit maintains a consistent process for notifying, communicating, and recording information for every
safety event, relying on accurate gathering and interpretation of on-scene information to identify root and causal
factors. All elements of the event are documented and become part of the Risk Assessment and Mitigation process.
Immediate Response (Driver / Staff on Scene)
● Assess the situation
● Obtain help
● Secure the scene
● Gather information
Investigation (Safety Committee / On-Site Investigator)
● Gather data — statements, photos, and scene conditions
● Liaise with emergency responders and notify the insurance carrier
● Investigate the scene once people and property are secure
● Conduct drug and alcohol testing, if required
● Meet local, state, and federal reporting requirements
Page 96 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 13 of 18
Internal Reporting Metrics
● Fatalities and fatal crashes per specified time period and system mileage
● Injuries and injury crashes per specified time period and system mileage
● Fatal / injury accidents per million passenger-miles or vehicle-miles traveled
● Collisions, pedestrian collisions, and vehicular collisions per specified time period
● Assaults on transit workers per specified time period
● Employee work days lost to injuries per specified time period
● Work-related fatalities per specified time period
● Workers' compensation payments per specified time period
● Percent of positive drug / alcohol tests per specified time period
● Traffic tickets issued to bus operators per specified time period
Page 97 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 14 of 18
7. Safety Promotion
Competencies and Training
The Director of Compliance conducts an annual training needs assessment to evaluate the level of competency for all
staff involved in safety-related roles.
Safety Communication
Franklin Transit communicates safety and safety-performance information throughout the organization, including
hazards and risks relevant to employees' roles and responsibilities, and informs employees of actions taken in
response to reports submitted through the Employee Safety Reporting Program.
● Memorandum announcements to staff
● Safety communications board
● Individual and group meetings
● On-the-job training opportunities
● Online training
Mandatory De-Escalation Training
All customer-facing staff are required to complete mandatory de-escalation training. This training equips employees
to recognize early warning signs of conflict, apply verbal and behavioral techniques to reduce tension, and safely
manage confrontational situations with passengers or the public before they escalate — supporting the zero-target
Assaults on Transit Workers measure adopted in Section 3.
Supporting Documentation
● Risk Assessment Matrix
● Safety Assessment and System Review
● Staff Safety Roles and Responsibilities
● Safety and Security Suggestion and Reporting Form
● Organization Chart
● Definitions and Acronyms
Page 98 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 15 of 18
Appendix A — Definitions and Acronyms
Definitions
Term Definition
Accident
An event involving loss of life, a serious injury, a collision of public transportation
vehicles, a runaway train, a life-safety evacuation, or any derailment of a rail transit
vehicle, regardless of cause.
Accountable Executive
A single, identifiable person with ultimate responsibility for carrying out the PTASP and
the Transit Asset Management Plan, and control over the resources needed to develop
and maintain both.
Assault on a Transit Worker A physical act of violence directed at a transit worker in the performance of their duties,
as defined and reported under NTD Safety and Security reporting requirements.
Collision Rate The total number of collisions (vehicular and pedestrian) per 100,000 Vehicle Revenue
Miles.
Event Any Accident, Incident, or Occurrence.
Hazard Any real or potential condition that can cause injury, illness, or death; damage to or loss
of facilities, equipment, rolling stock, or infrastructure; or damage to the environment.
Incident An event involving a non-serious personal injury, an injury requiring medical transport,
or damage disrupting agency operations.
National Public
Transportation Safety Plan
The plan to improve safety of all public transportation systems receiving Federal
financial assistance under 49 U.S.C. Chapter 53.
Pedestrian Collision Rate The number of collisions involving a pedestrian per 100,000 Vehicle Revenue Miles.
Performance Measure A quantifiable indicator of performance or condition used to establish targets and
assess progress.
Performance Target A quantifiable level of performance to be achieved within an FTA-required time period.
Public Transportation
Agency Safety Plan (PTASP)
The documented, comprehensive Agency Safety Plan required by 49 U.S.C. 5329 and
Part 673.
Risk The composite of predicted severity and likelihood of the potential effect of a hazard.
Safety Performance Target A performance target related to safety management activities.
Small Public Transportation
Provider
A recipient or subrecipient of Federal financial assistance under 49 U.S.C. § 5307 with
100 or fewer vehicles in peak revenue service, that does not operate a rail fixed
guideway system.
System Reliability Mean distance between major mechanical failures, measured in Vehicle Revenue Miles.
Transit Worker Fatality Rate
/ Injury Rate
The rate of transit worker fatalities or injuries, respectively, per 100,000 Vehicle
Revenue Miles.
Vehicle Revenue Miles
(VRM)
Miles operated in revenue service, as reported to the National Transit Database, used as
the exposure denominator for rate-based Safety Performance Measures.
Page 99 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 16 of 18
Acronyms
Acronym Word or Phrase
ADA Americans with Disabilities Act of 1990
ASP Agency Safety Plan (also referred to as PTASP under Part 673)
CFR Code of Federal Regulations
FTA Federal Transit Administration
MPO Metropolitan Planning Organization
NTD National Transit Database
Part 673 49 CFR Part 673 (Public Transportation Agency Safety Plan)
SMS Safety Management System
SRM Safety Risk Management
VRM Vehicle Revenue Miles
Page 100 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 17 of 18
Appendix B — Safety Program Self-Assessment Checklist
Use this checklist to periodically verify compliance with agency safety policies, employee file requirements, training,
meetings, incident investigation, substance abuse policy, facility inspections, and asset management practices.
Safety Policies
Review Item Y / N
Are all safety policies up to date and reviewed? ☐ Y ☐ N
Is a PTASP or other System Safety Plan written for the transit system? ☐ Y ☐ N
Is the Drug and Alcohol Policy current and up to date? ☐ Y ☐ N
Education and Training
Review Item Y / N
Are operator certifications current? ☐ Y ☐ N
Have managers completed SMS training? ☐ Y ☐ N
Have all safety-sensitive employees received Drug and Alcohol training? ☐ Y ☐ N
Have all customer-facing staff completed mandatory de-escalation training? ☐ Y ☐ N
Safety Meetings
Review Item Y / N
Is there an active Safety Committee that meets regularly? ☐ Y ☐ N
Are meetings documented with sign-in sheets and publicly posted agendas/minutes? ☐ Y ☐ N
Incident and Accident Investigation
Review Item Y / N
Are reporting policies in place and report forms kept on board? ☐ Y ☐ N
Are accident reports completed for all situations and used for pre-/post-accident training? ☐ Y ☐ N
Are collisions, assaults, and worker injuries logged separately to support Section 3 rate
calculations? ☐ Y ☐ N
Asset Management (Vehicles)
Review Item Y / N
Is a current vehicle list maintained and is all maintenance activity tracked? ☐ Y ☐ N
Is a regular maintenance schedule written, followed, and are work orders completed? ☐ Y ☐ N
Are unscheduled road calls and towing events logged and distinguished from scheduled
maintenance to support the System Reliability measure? ☐ Y ☐ N
Page 101 of 126
Franklin Transit Authority Public Transportation Agency Safety Plan — Update 4
Page 18 of 18
Appendix C — Amendment Record
This appendix documents formal amendments to this Public Transportation Agency Safety Plan (PTASP), adopted to
meet Federal Transit Administration requirements.
Amendment 1 — Effective 12/31/2022
Field Entry
Regulatory Basis FTA requirements; Bipartisan Infrastructure Law, 49 U.S.C. § 5329(d)
Plan Section(s) Affected Sections 5 and 7
Summary of Changes
Added CDC Guidelines as a hazard identification resource; added barriers around the
bus operator workstation as a physical defense; added mandatory de-escalation
training for all customer-facing staff.
Amendment 2 — Effective 07/21/2026
Field Entry
Regulatory Basis
FTA Final Rule, National Public Transportation Safety Plan (89 FR 25276, April 10,
2024); FTA Final Rule, Public Transportation Agency Safety Plans (89 FR 25470, April
11, 2024); 49 U.S.C. § 5329(d)
Plan Section(s) Affected Section 3 — Safety Performance Targets
Summary of Changes
Expanded Safety Performance Targets from 7 to 14 measures. Added Collision Rate,
Pedestrian Collision Rate, Vehicular Collision Rate, Transit Worker Fatality Rate,
Transit Worker Injury Rate, Assaults on Transit Workers, and Rate of Assaults on
Transit Workers, with targets set at industry-standard excellence levels for a small,
23-vehicle Fixed Route / Demand Response provider. Formalized the Vehicle Revenue
Miles (VRM) basis for all rate calculations. Existing Fatalities, Injuries, Safety Events,
and System Reliability targets are unchanged. Added Section 6 language on annual
performance verification against VRM.
Board Approval and Signatures
Chairman — Signature / Date
Accountable Executive — Signature / Date
Safety Committee Review and Approval
Safety Committee / Committee Representative — Signature / Date
Records Retention
Original signed copies of this Plan and its Amendments are on file at the Franklin Transit Authority offices, 708
Columbia Avenue, Franklin, TN 37064.
Page 102 of 126
BAI 8-4-26C
FRANKLIN TRANSIT AUTHORITY
BOARD ACTION ITEM
Item Number: BAI 8-4-26C Meeting Date: 08-04-2026
Item Title: Consideration of Franklin Transit Authority Public Transportation
Safety Plan
________________________________________________
BACKGROUND
Federal Transit Administration published Public Transportation Agency Safety
Plan (PTASP) Final Rule requires certain operators of public transportation
systems that receive federal funds under FTA’s Urbanized Area Formula Grants
(49 U.S.C. 5307) to develop safety plans that include the processes and
procedures to implement Safety Management Systems. The plan must include
safety performance targets. Transit operators also must certify they have a safety
plan in place meeting the requirements of the PTASP. The plan must be updated
and certified by the transit agency annually.
STAFF RECOMMENDATION
TMA s taff recommend that the Franklin Transit Authority approve the Franklin
Transit Authority Public Transportation Safety Plan.
________________________________________________
Approved _____________________________ _____________________
Board Officer Date
Page 103 of 126
FRANKLIN TRANSIT AUTHORITY
Transit Asset Management (TAM) Plan
Tier II TAM Plan — Updated July 20, 2026
NTD ID: 40162
TAM Plan Type: Tier II
Accountable Executive: Debbie Henry, President and CEO — TMA Group
Plan Horizon: FY2026 – FY2030 (5 Years)
Last Modified: July 20, 2026
SECTION 1: INTRODUCTION & AGENCY OVERVIEW
This Transit Asset Management (TAM) Plan has been developed by the Franklin Transit Authority in compliance with the
Federal Transit Administration's TAM Final Rule, 49 CFR Part 625, as mandated by the Moving Ahead for Progress in the 21st
Century Act (MAP-21) and the Fixing America's Surface Transportation (FAST) Act. As a Tier II transit provider operating 100
or fewer vehicles in peak revenue service and not operating rail fixed-guideway systems, Franklin Transit Authority is required
to develop and maintain a TAM Plan that includes an asset inventory, condition assessments, and a prioritized investment
strategy to achieve and maintain a State of Good Repair (SGR) for all capital assets.
This update was prepared to satisfy the Federal Transit Administration's requirement that all agencies complete an updated,
compliant TAM Plan by October 2026, and to reconcile the plan against the agency's current physical asset inventory.
Note on Plan Scope: This TAM Plan forecasts asset condition, performance targets, and capital replacement needs for a three -year
window (FY2027–FY2029) covering the agency's present fleet and the replacement of existing vehicles. The Franklin Transit
Vision Plan, once finalized, is expected to affect the type, size, and number of vehicles operated going forward, which will in tu rn
affect future asset management planning. This plan does not attempt to forecast those changes; it will be revisited and updat ed
once the Vision Plan's outcomes are known.
Agency Overview
Franklin Transit operates Fixed Route and Demand Response service for the City of Franklin, Tennessee. The Franklin Transit
Authority was established by the City of Franklin, Board of Alderman to provide local transit within the City limits of Franklin,
TN. Franklin Transit currently operates from the Transit Center located at 708 Columbia Avenue, Franklin, Tennessee. Assets
are titled under the Franklin Transit Authority and the City of Franklin. The system carries over 100,000 passenger trips per
year. Operations and management of the transit system are contracted to the TMA Group.
Summary of Changes in This Update
● Full reconciliation of the revenue vehicle and equipment fleet against current vehicle titles, VINs, and license plates (25
assets)
● Addition of three newly delivered FY2026 cutaway buses (Units #226, #326, #426 — Chevy Starcraft Allstar)
● Revised active fleet: 3 Bus (BU), 19 Cutaway Bus (CU), 1 Mini-van (MV), 2 Non-Revenue Service Automobiles
● Updated condition assessment and Useful Life Benchmark (ULB) status for all assets based on current age and mileage
● Incorporated the agency's anticipated FY2027–FY2029 vehicle replacement schedule (Section 10), reducing the cutaway
ULB backlog to target by FY2028 and clearing it by FY2029
● TMA Group has secured CMAQ funding to repower and refurbish buses #303 and #403, two of the original Franklin Transit
trolleys, rather than replace them (Section 10.6)
● Scoped this update to a 3-year forecast (FY2027–FY2029) of the present fleet, pending the Franklin Transit Vision Plan's
future impact on fleet type and size
SECTION 2: ACCOUNTABLE EXECUTIVE
Per 49 CFR § 625.25(b), the Accountable Executive is responsible for carrying out TAM practices, directing resources needed
to develop and maintain the TAM Plan, and approving annual SGR performance targets.
Page 104 of 126
Role Name / Title
Accountable Executive Debbie Henry, President and CEO — TMA Group
Agency Franklin Transit Authority
NTD ID 40162
The Accountable Executive self-certifies this TAM Plan via annual FTA Certifications and Assurances submitted through
TrAMS.
SECTION 3: TAM PLAN OVERVIEW
Element Detail
Plan Type Tier II
Horizon Period FY2026 – FY2030 (5 years)
Services Operated Fixed Route and Demand Response
Total Fleet 25 vehicles (23 revenue vehicles + 2 non-revenue service automobiles)
Annual Ridership 100,000+ passenger trips
Asset Categories Covered Revenue Vehicles, Equipment, Facilities
Cutaway (CU) Fleet SGR Target ≤ 30% exceeding ULB
Decision Support Tool FTA TAMPlate
Rolling Stock Funding Split 80% Federal / 10% State / 10% Local
Cutaway Unit Replacement Cost
(current) $135,000
NTD Reporting Deadline Annual NTD submission; next TAM update due October 2026
SECTION 4: TAM & SGR POLICY, VISION, AND GOALS
4.1 TAM and State of Good Repair (SGR) Policy
“The agency commits to maintaining all transit assets in a State of Good Repair through systematic asset management
practices that prioritize safety, reliability, and cost-effectiveness while complying with FTA requirements for Tier II providers.”
4.2 Continuous Improvement
As technology continues to improve both in vehicles and maintenance software, Franklin Transit will continue to pursue
upgrades through grant funding.
4.3 TAM Vision
“To maintain a state of good repair across all transit assets through strategic, data-driven decision-making that optimizes
resource allocation, enhances safety and reliability, and delivers superior service to our communities while ensuring long-term
fiscal sustainability and environmental stewardship.”
● Implementing systematic approaches to asset lifecycle management
● Prioritizing safety and reliability in all maintenance decisions
● Leveraging technology and data analytics for predictive maintenance
● Ensuring cost-effective resource allocation
● Supporting environmental sustainability goals
● Meeting or exceeding FTA performance targets
● Maintaining transparency in asset management practices
● Building resilient infrastructure for future growth
Page 105 of 126
4.4 TAM Goals
Goal Objectives
GOAL 1: SAFETY AND
RELIABILITY
Reduce service interruptions due to maintenance issues by 10% annually; achieve zero safety
incidents related to asset condition
GOAL 2: FISCAL
RESPONSIBILITY
Optimize lifecycle costs for all capital assets; maintain operating costs within 5% of approved
budget; maintain a 5-year capital investment plan with identified funding sources; achieve 80%+
preventive maintenance on-time performance
GOAL 3: DATA-DRIVEN
DECISION MAKING
Improve asset management software system; create quarterly performance metrics dashboard;
maintain accurate asset inventory with 100% of assets tracked
GOAL 4: OPERATIONAL
EXCELLENCE
Achieve 90%+ on-time performance; maintain fleet availability rate of 85% or higher; establish
standard operating procedures for all maintenance activities
SECTION 5: ASSET INVENTORY
The following inventory reflects Franklin Transit's complete fleet of 25 revenue and non-revenue vehicles as verified against
current vehicle titles, VINs, and license plates as of July 2026.
5.1 Complete Fleet Inventory
Full VIN, license plate, and ULB detail for each vehicle is provided in Appendix A.
Veh. ID Class Make Model Year / Age Mileage Stated Value Past ULB?
303 BU Freightliner XB Chassis 2003 / 23 yr 344,560 $30,000 YES
403 BU Freightliner XB Chassis 2003 / 23 yr 177,383 $30,000 YES
107 BU Gillig Low Floor Bus 2007 / 19 yr 39,246 $90,000 YES
401 NR Dodge Grand Caravan 2010 / 16 yr 88,886 $5,000 YES
111 NR Ford Escape Hybrid 2011 / 15 yr 245,520 $7,000 YES
114 CU Ford Starcraft E450 2014 / 12 yr 287,600 $25,000 YES
215 CU Ford Starcraft E450 2016 / 10 yr 280,470 $32,000 YES
216 CU Ford Starcraft E450 2017 / 9 yr 226,360 $35,000 YES
316 CU Ford Starcraft E450 2017 / 9 yr 243,988 $35,000 YES
119 CU Ford E-Series Wagon 2019 / 7 yr 224,994 $48,000 YES
121 MV Dodge Grand Caravan 2019 / 7 yr 105,770 $40,000 YES
219 CU Ford E-350 2019 / 7 yr 202,154 $48,000 YES
320 CU Ford Starcraft E450 2019 / 7 yr 160,224 $82,089 YES
420 CU Ford E-Series Chassis 2019 / 7 yr 160,828 $82,089 YES
120 CU Ford Starcraft E450 2020 / 6 yr 196,538 $72,000 YES
220 CU Ford E-350 2020 / 6 yr 180,159 $72,000 YES
123 CU Ford Starcraft E450 2023 / 3 yr 116,393 $131,000 No
223 CU Ford Starcraft Allstar 2023 / 3 yr 106,507 $131,000 No
124 CU Ford Starcraft Allstar 2024 / 2 yr 58,089 $131,900 No
125 CU Chevy Starcraft 2024 / 2 yr 50,348 $138,790 No
224 CU Ford Starcraft Allstar 2024 / 2 yr 60,098 $131,900 No
225 CU Chevy Starcraft 2024 / 2 yr 39,613 $138,790 No
226 CU Chevy Starcraft Allstar 2026 / 0 yr 9,679 $131,350 No
326 CU Chevy Starcraft Allstar 2026 / 0 yr 7,529 $131,350 No
426 CU Chevy Starcraft Allstar 2026 / 0 yr 9,679 $131,350 No
Page 106 of 126
5.2 Fleet Summary by Asset Class
Asset Class Total # Avg Age (yrs) # Past ULB % Past ULB Total Stated
Value
BU – Bus 3 21.7 3 100.0% $150,000
CU – Cutaway Bus 19 4.9 10 52.6% $1,728,608
MV – Mini-van 1 7.0 1 100.0% $40,000
Non-Rev. Auto 2 15.5 2 100.0% $12,000
TOTAL FLEET 25 — 16 64.0% $1,930,608
5.3 Facilities Inventory
Facility Type Year Built TERM Rating Replacement Value
Passenger Transit Center Passenger Facility 2007 5.0 (Excellent) $2,000,000
Administration / Transit Staff Administration 2007 5.0 (Excellent) $4,000,000
TOTAL (2 facilities) 0% below
TERM 3.0 $6,000,000
SECTION 6: CONDITION ASSESSMENT
6.1 Revenue Vehicles & Equipment
Per 49 CFR § 625.43, condition of rolling stock and equipment is measured by the percentage of assets that have met or
exceeded their Useful Life Benchmark (ULB). FTA default ULBs applied in this plan:
Asset Class ULB (Age) ULB (Mileage)
CU – Cutaway Bus 5 years 150,000 miles
BU – Bus 12 years 250,000 miles
MV – Mini-van 5 years 150,000 miles
Non-Revenue Service Automobile 4 years 100,000 miles
6.2 Facilities
Facility condition is assessed using the TERM (Transit Economic Requirements Model) Scale (1.0–5.0). The SGR performance
measure is the percentage of facilities with a TERM condition rating below 3.0. Both Franklin Transit facilities are currently
rated Adequate or better (0% below TERM 3.0).
Assessment Date: July 1, 2026
SECTION 7: DECISION SUPPORT TOOLS
Process / Tool Brief Description
Dedicated Staff Facility Maintenance Plan
Analysis of facility contents and expected lifespan of each item. Preventive maintenance
schedule assigned and maintained; replacement schedule developed based on condition
analysis.
Vehicle and GPS Software Staff and technology dedicated to continuous monitoring of vehicle assets, providing proper
maintenance, safety support, and protection of the vehicle.
Revenue Vehicle Maintenance Software Tracks service records, cost, mileage, and maintenance schedule. Preventive maintenance
performed every 5,000 miles.
FTA TAMPlate
FTA-provided decision support tool for Tier II providers. Facilitates asset inventory
management, condition assessment tracking, ULB calculation, SGR performance monitoring,
capital replacement planning with inflation-adjusted cost projections, and NTD reporting
integration.
Page 107 of 126
SECTION 8: ASSET MANAGEMENT STRATEGIES
8.1 Maintenance Strategy
Activity Description Est. Cost
Pre/Post-Trip Inspection Performed daily by drivers; repairs reported and completed within
48 hours; safety-sensitive issues handled immediately. $25.00
Unexpected Maintenance Unscheduled repairs for mechanical or electronic failures. $1,000.00
Scheduled PM Service Every 5,000 miles — oil/fluids, tire inspection, wheelchair lift
inspection, AC/heat check, battery, doors. $200.00
8.2 Overhaul Strategy
Cutaway buses are rarely overhauled; the agency's strategy emphasizes scheduled replacement over major overhaul given the
cost-effectiveness of cutaway-chassis replacement.
8.3 Disposal Strategy
Vehicles are disposed of when they meet or exceed their FTA Useful Life Benchmark. Vehicles are sold at Public Auction by
the City of Franklin.
8.4 Acquisition and Renewal Strategy
Cutaway buses are rotated on a target 5-year cycle; vehicles approaching 6 years of age may be retained as spares where budget
requires. Facilities undergo annual condition assessment and useful-life analysis to prioritize renewal investment.
SECTION 9: PERFORMANCE TARGETS — STATE OF GOOD REPAIR (SGR)
9.1 Current (Baseline) Performance by Asset Class
Asset Class Performance Measure Baseline (Jul 2026) SGR Target
CU – Cutaway Bus (19) % exceeding ULB 52.6% ≤ 30% by end of FY2028
BU – Bus (3) % exceeding ULB 100.0%
#303/#403 repower via CMAQ
(funded); #107 via separate
capital project
MV – Mini-van (1) % exceeding ULB 100.0% Replace FY2028
Non-Revenue Auto (2) % exceeding ULB 100.0%
Both units past ULB;
replacement recommended
FY2029–FY2030 as funding
allows
Facilities (2) % below TERM 3.0 0% Maintain 0%
9.2 Cutaway (CU) Fleet SGR Trajectory, FY2027–FY2029
The cutaway fleet is currently 52.6% past ULB (10 of 19), above the ≤30% target. Per the agency's anticipated replacement
schedule (Section 10), the fleet reaches target by the end of FY2028 and clears the full ULB backlog by FY2029.
Fiscal Year Action # Replaced CU Past ULB (End of FY) % vs. ≤30% Target
Baseline (Jul 2026) — — 10 of 19 52.6% — Above Target
FY2027 Replace 4 vehicle(s): #114, #215, #316, #216 4 6 of 19 31.6% — Above Target
FY2028 Replace 4 vehicle(s): #119, #219, #120, #220 4 2 of 19 10.5% — ✓ AT/BELOW TARGET
FY2029 Replace 3 vehicle(s): #320, #420, #223 (incl.
proactive replacement ahead of ULB) 3 0 of 19 0.0% — ✓ AT/BELOW TARGET
Page 108 of 126
SECTION 10: PRIORITIZED INVESTMENT STRATEGY & CAPITAL
REPLACEMENT PLAN
10.1 Prioritization Methodology
Replacement priority is determined by: (1) age and mileage relative to ULB — vehicles furthest past ULB receive highest
priority; (2) vehicle condition and maintenance cost trends; (3) safety-related considerations; and (4) funding availability by
fiscal year.
10.2 Investment Priorities
1. Future Transit Facility to house vehicles and drivers
2. Annual procurement of replacement vehicles to keep the fleet safe, reliable, and in a state of good repair
3. Technology — replacement and acquisition of hardware/software to improve operational efficiency
10.3 FY2027–FY2029 Capital Replacement Schedule
Reflects the Accountable Executive's anticipated replacement schedule as of July 2026.
Fiscal Year Class Vehicles Scheduled # Units Est. Cost
FY2027 CU – Cutaway Bus #114, #215, #316, #216 4 $583,200
FY2028 CU – Cutaway Bus #119, #219, #120, #220 4 $682,344
MV – Mini-van #121 1
FY2029 CU – Cutaway Bus #320, #420, #223 3 $510,183
FY2027–
FY2029 TOTAL $1,775,727
Unit costs escalate at 8% per year from a $135,000 (cutaway) / $45,000 (mini-van) FY2026 baseline: FY2027 cutaway ≈ $145,800; FY2028 cutaway
≈ $157,464, mini-van ≈ $52,488; FY2029 cutaway ≈ $170,061. #223 is included as a proactive FY2029 replacement ahead of its ULB. Costs should
be refined annually as actual procurement quotes are received.
Outstanding needs not yet scheduled: Bus #107 (Gillig, 19 years/38,419 mi) remains past its 12-year/250,000-mile ULB and is recommended for a
separate capital replacement project; both non-revenue service automobiles (#401, #111) are past ULB and recommended for replacement in
FY2029–FY2030 as funding allows. Buses #303 and #403 are addressed separately in Section 10.6 via secured CMAQ funding.
10.4 Funding Breakdown by Fiscal Year (80% Federal / 10% State / 10% Local)
Fiscal Year Total (YOE $) Federal (80%) State (10%) Local (10%)
FY2027 $583,200 $466,560 $58,320 $58,320
FY2028 $682,344 $545,875 $68,234 $68,234
FY2029 $510,183 $408,147 $51,018 $51,018
TOTAL $1,775,727 $1,420,582 $177,573 $177,573
10.5 Funding Sources
Source Program Notes
Federal FTA §5307 / §5339 Urbanized Area Formula and Bus & Bus Facilities programs
State TDOT State Match / IMPROVE Transit
Investment Grant
10% state match; IMPROVE grant up to $5M per project, 20%
local match required
Local City of Franklin Appropriation Through the Invest Franklin initiative; property tax component
dedicated to infrastructure/transportation
Federal CMAQ (Congestion Mitigation and Air
Quality)
Secured by TMA Group for repower/refurbishment of buses
#303 and #403 (see Section 10.6); typical CMAQ cost share is
80% federal / 20% non-federal match unless otherwise
specified in the award
Page 109 of 126
10.6 CMAQ-Funded Repower & Refurbishment — Units #303 & #403
TMA Group has secured Congestion Mitigation and Air Quality (CMAQ) program funding to repower and refurbish buses
#303 and #403 — two of the original Franklin Transit trolleys (2003 Freightliner XB Chassis). Rather than replacing these
vehicles under the standard rolling-stock replacement cycle in Section 10.3, the agency will retain and rehabilitate them in
recognition of their role in the system's history and continued service value.
Vehicle ID Year Age Current Mileage Scope of Work
#303 2003 23 yrs 344,560 Engine/drivetrain repower and full
refurbishment under CMAQ funding
#403 2003 23 yrs 177,383 Engine/drivetrain repower and full
refurbishment under CMAQ funding
Funding source: CMAQ, secured by TMA Group. Project cost, funding split, and delivery timeline will be finalized as the award scope is confirmed
and will be incorporated into the next TAM Plan update. Because repower/refurbishment restores rather than replaces these assets, #303 and #403
are expected to remain in the BU – Bus inventory following completion of the project, with updated condition and expected remaining useful life
reflected once work is complete.
SECTION 11: RISK MANAGEMENT
Risk Mitigation Strategy
Loss of fleet storage facility / insufficient
growth capacity
TMA Group has obtained a lease at 203 Beasley for the next 4 years; however, this facility
does not allow for vehicle fleet growth. Finding a larger, long-term storage and maintenance
facility solution remains a significant need and a potential risk to the agency's ability to
expand service. Mitigation strategies include pursuing a long-term lease or property purchase
at an alternate location using Federal Transit, City of Franklin, or TDOT funds well before the
current lease expires.
Operational, financial, compliance, safety,
and emergency risk
Risk Identification: reactive methods (occurrence reporting, incident investigation, trend
monitoring) and proactive methods (direct observation of day-to-day operations); reporting
channels include safety/operations/financial/compliance assessments, audits, customer
feedback, and a confidential employee suggestion box. Risk Assessment: experienced
personnel evaluate likelihood, severity, and exposure using a Risk Assessment Matrix (RAM)
at the direction of the CEO. Risk Mitigation: assessment results drive mitigation actions
proportionate to the level of risk identified, documented and communicated to the
Accountable Executive.
Loss of federal funding Decrease dependency on federal funding where feasible; prioritize service and eliminate poor-
performing service.
SECTION 12: TOTAL ASSET VALUATION SUMMARY
Asset Category Count Current Stated Value Est. Replacement Cost
Revenue Vehicles — CU (Cutaway) 19 $1,728,608 $2,565,000
Revenue Vehicles — BU (Bus) 3 $150,000 $950,000
Revenue Vehicles — MV (Mini-van) 1 $40,000 $45,000
Non-Revenue Service Automobiles 2 $12,000 $60,000
Facilities 2 $6,000,000 $6,000,000
GRAND TOTAL 25 $7,930,608 $9,620,000
Page 110 of 126
SECTION 13: TAM PLAN CERTIFICATION
This Transit Asset Management Plan has been developed and is maintained in compliance with 49 CFR Part 625. The
Accountable Executive certifies that:
● Franklin Transit Authority operates Fixed Route and Demand Response services serving the City of Franklin, Tennessee,
carrying over 100,000 passenger trips per year;
● The asset inventory in Section 5 is complete and accurate as of July 2026, reconciled against vehicle titles, VINs, and licen se
plates, with assets titled under the Franklin Transit Authority and the City of Franklin;
● Condition assessments have been performed using FTA-approved ULB and TERM Scale methodologies;
● SGR performance targets have been established, including a ≤ 30% cutaway fleet ULB -exceedance target (current: 52.6%),
and will be reported to the National Transit Database annually;
● A prioritized investment strategy (Section 10) is in place to achieve the ≤30% cutaway target by the end of FY2028 and clear
the full backlog by FY2029;
● Capital replacement is funded through an 80% Federal / 10% State / 10% Local cost -sharing arrangement for standard
rolling-stock replacement, and TMA Group has secured CMAQ funding for the repower and refurbishment of buses #303
and #403 (Section 10.6);
● The agency commits to maintaining all transit assets in a State of Good Repair through systematic asset management
practices that prioritize safety, reliability, and cost-effectiveness;
● This plan will be updated at least every four years, or as significant changes occur, consistent with FTA's October 2026
compliance deadline.
Certified by:
Debbie Henry, President and CEO — TMA Group
Accountable Executive, Franklin Transit Authority
Date: July 20, 2026
Page 111 of 126
APPENDIX A: FULL VEHICLE INVENTORY — VIN, PLATE & ULB DETAIL
Complete fleet of 25 vehicles as verified against titles, VINs, and license plates, July 2026. Rows shaded red have met or exceeded their FTA Useful Life Benchmark
(ULB); rows shaded green remain within ULB.
Veh. ID VIN License Plate Class Age ULB (Age/Mi) Mileage Stated Value Past ULB?
303 4UZAAUBV93CL88474 GV-7458 BU 23 12yr / 250k mi 344,560 $30,000 YES
403 4UZAAUBV03CL88475 GV-7463 BU 23 12yr / 250k mi 177,383 $30,000 YES
107 15GGB301571077799 GY-7477 BU 19 12yr / 250k mi 39,246 $90,000 YES
401 2D4RN4DE1AR498600 GZ-5087 NR 16 4yr / 100k mi 88,886 $5,000 YES
111 1FMCU5K39BKA34074 GZ-5071 NR 15 4yr / 100k mi 245,520 $7,000 YES
114 1FDFE4FL0DDB04924 3673-GC CU 12 5yr / 150k mi 287,600 $25,000 YES
215 1FDFE4FS6GDC03761 0542-GD CU 10 5yr / 150k mi 280,470 $32,000 YES
216 1FDFE4FS2HDC03435 7282-GD CU 9 5yr / 150k mi 226,360 $35,000 YES
316 1FDFE4FS9HDC03433 7283-GD CU 9 5yr / 150k mi 243,988 $35,000 YES
119 1FDEE3FS0KDC12258 6936GF CU 7 5yr / 150k mi 224,994 $48,000 YES
121 2C7WDGBG4KR792036 7542-GG MV 7 5yr / 150k mi 105,770 $40,000 YES
219 1FDEE3FS3KDC12268 6935GF CU 7 5yr / 150k mi 202,154 $48,000 YES
320 1FDFE4FS2KDC68969 7508-GG CU 7 5yr / 150k mi 160,224 $82,089 YES
420 1FDFE4FS9KDC68970 7509-GG CU 7 5yr / 150k mi 160,828 $82,089 YES
120 1FDEE3FS3KDC55556 2244-GG CU 6 5yr / 150k mi 196,538 $72,000 YES
220 1FDEE3FS5KDC55557 2245-GG CU 6 5yr / 150k mi 180,159 $72,000 YES
123 1FDFE4FN0PDD19757 2481GI CU 3 5yr / 150k mi 116,393 $131,000 No
223 1FDEE3FN8PDD34819 2480-GI CU 3 5yr / 150k mi 106,507 $131,000 No
124 1FDEE3FN7RDD33602 4568-GI CU 2 5yr / 150k mi 58,089 $131,900 No
125 1HA6GUB76RN000166 5066GJ CU 2 5yr / 150k mi 50,348 $138,790 No
224 1FDEE3FN6RDD33610 4567GI CU 2 5yr / 150k mi 60,098 $131,900 No
225 1HA6GUB70RN000082 5067GJ CU 2 5yr / 150k mi 39,613 $138,790 No
226 1HA6GUB7XRN009159 2179GK CU 0 5yr / 150k mi 9,679 $131,350 No
326 1HA6GUB75RN009134 2178GK CU 0 5yr / 150k mi 7,529 $131,350 No
426 1HA6GUB70RN009137 2177GK CU 0 5yr / 150k mi 9,679 $131,350 No
Page 112 of 126
The Transportation Management Association Group
BOARD ACTION ITEM
Item Number: BAI 8-4-26D Meeting Date: 08-04-26
Item Title: Consideration of Federal Transit Administration Management Transit
Asset Management (TAM) Plan Performance Measures Targets
BACKGROUND
The Federal Transit Administration requires public transportation providers to
update Transit Asset Management (TAM) plans. The requirement applies to all
5307 funds recipients and subrecipients that own, operate, or manage public
transportation capital. TAM plans must include an asset inventory, condition
assessments or inventoried assets, and a prioritized list of investments to
improve the state of good repair on their capital assets. Performance targets are
required to be set for capital assets based on the state of good repair measures;
targets must be reported to the National Transit Database (NTD), as well as
information related to the condition of the capital assets.
The TMA Group is required to submit a completed and compliant TAM Plan
Performance Measure Targets Report annually in October. This report sets a
target that keeps the fleet at maximum performance level.
STAFF RECOMMENDATION
TMA staff recommend the Board accept the Federal Transit Management Transit
Asset Management (TAM) Plan Performance Measures for Franklin Transit.
Approved _____________________________ _____________________
Board Officer Date
ITEM BAI 8-4-26D
Page 113 of 126
DRUG AND ALCOHOL TESTING POLICY
TMA Group Safety Sensitive
FRANKLIN TRANSIT AUTHORITY
Effective as of July 1, 2026
Table of Contents
1. Purpose of Policy
2. Covered Employees
3. Prohibited Behavior
4. Consequences for Violations
5. Circumstances for Testing
6. Testing Procedures
7. Test Refusals
8. Voluntary Self-Referral
9. Prescription Drug Use
10. Contact Person
Attachment A: Covered Positions
Attachment B: Post-Accident No-Fault Determination Form
1. Purpose of Policy
This policy complies with 49 CFR Part 655, as amended and 49 CFR Part 40, as amended.
Copies of Parts 655 and 40 are available in the drug and alcohol program manager's office
and can be found on the internet at the Federal Transit Administration (FTA) Drug and
Alcohol Program website http://transit-safety.fta.dot.gov/DrugAndAlcohol/.
All covered employees are required to submit to drug and alcohol tests as a condition of
employment in accordance with 49 CFR Part 655.
Portions of this policy are not FTA-mandated, but reflect Franklin Transit Authority's
policy. These additional provisions are identified by bold text.
In addition, DOT has published 49 CFR Part 32, implementing the Drug-Free Workplace Act
of 1988, which requires the establishment of drug-free workplace policies and the
reporting of certain drug-related offenses to the FTA.
Page 114 of 126
All Franklin Transit Authority employees are subject to the provisions of the Drug-Free
Workplace Act of 1988.
The unlawful manufacture, distribution, dispensation, possession or use of a controlled
substance is prohibited in the covered workplace. An employee who is convicted of any
criminal drug statute for a violation occurring in the workplace shall notify the Transit
Director for Franklin Transit Authority in writing no later than five days after such
conviction.
Employees must abide by the terms of this policy as a condition of employment.
2. Covered Employees
This policy applies to every person, including an applicant or transferee, who performs or
will perform a "safety-sensitive function" as defined in Part 655, section 655.4.
You are a covered employee if you perform any of the following:
- Operating a revenue service vehicle, in or out of revenue service
- Operating a non-revenue vehicle requiring a commercial driver's license
- Controlling movement or dispatch of a revenue service vehicle
- Maintaining (including repairs, overhaul and rebuilding) of a revenue service vehicle or
equipment used in revenue service
- Carrying a firearm for security purposes
See Attachment A for a list of covered positions by job title.
3. Prohibited Behavior
Use of illegal drugs is prohibited at all times. Prohibited drugs include:
- marijuana
- cocaine
- phencyclidine (PCP)
- opioids
- amphetamines
All covered employees are prohibited from performing or continuing to perform safety-
sensitive functions while having an alcohol concentration of 0.04 or greater.
All covered employees are prohibited from consuming alcohol while performing safety-
sensitive job functions or while on-call to perform safety-sensitive job functions. If an on-
call employee has consumed alcohol, they must acknowledge the use of alcohol at the time
that they are called to report for duty. If the on-call employee claims the ability to perform
his or her safety-sensitive function, he or she must take an alcohol test with a result of less
than 0.02 prior to performance.
Page 115 of 126
All covered employees are prohibited from consuming alcohol within four (4) hours prior
to the performance of safety-sensitive job functions.
All covered employees required to take a post-accident test are prohibited from consuming
alcohol for eight (8) hours following involvement in an accident or until he or she submits
to the post-accident drug and alcohol test, whichever occurs first.
4. Consequences for Violations
Following a positive drug or alcohol (BAC at or above 0.04) test result or test refusal, the
employee will be immediately removed from safety-sensitive duty and provided with
contact information for Substance Abuse Professionals (SAPs).
Following a BAC of 0.02 or greater, but less than 0.04, the employee will be immediately
removed from safety-sensitive duties until the start of their next regularly scheduled duty
period (but for not less than eight hours) unless a retest results in the employee's alcohol
concentration being less than 0.02.
Zero Tolerance
Per Franklin Transit Authority policy, any employee who tests positive for drugs or
alcohol (BAC at or above 0.04) or refuses to test will be terminated from
employment.
5. Circumstances for Testing
Pre-Employment Testing
Pre-employment alcohol tests are conducted after making a contingent offer of
employment or transfer. All pre-employment alcohol tests will be conducted using the
procedures set forth in 49 CFR Part 40. An alcohol test result of less than 0.02 is required
before an employee can first perform safety-sensitive functions. If a pre-employment
alcohol test is cancelled, the individual will be required to undergo another test with a
result of less than 0.02 before performing safety-sensitive functions.
A negative pre-employment drug test result is required before an employee can first
perform safety-sensitive functions. If a pre-employment test is cancelled, the individual will
be required to undergo another test and successfully pass with a verified negative result
before performing safety-sensitive functions.
If a covered employee has not performed a safety-sensitive function for 90 or more
consecutive calendar days, and has not been in the random testing pool during that time,
the employee must take and pass a pre-employment test before he or she can return to a
safety-sensitive function.
Page 116 of 126
A covered employee or applicant who has previously failed or refused a DOT drug and/or
alcohol test must provide proof of having successfully completed a referral, evaluation, and
treatment plan meeting DOT requirements.
Reasonable Suspicion Testing
All covered employees shall be subject to a drug and/or alcohol test when Franklin Transit
Authority has reasonable suspicion to believe that the covered employee has used a
prohibited drug and/or engaged in alcohol misuse. A reasonable suspicion referral for
testing will be made by a trained supervisor or other trained company official on the basis
of specific, contemporaneous, articulable observations concerning the appearance,
behavior, speech, or body odors of the covered employee.
Covered employees may be subject to reasonable suspicion drug testing any time while on
duty. Covered employees may be subject to reasonable suspicion alcohol testing while the
employee is performing safety-sensitive functions, just before the employee is to perform
safety-sensitive functions, or just after the employee has ceased performing such functions.
Post-Accident Testing
Covered employees shall be subject to post-accident drug and alcohol testing under the
following circumstances:
FTA-Mandated Testing (49 CFR Part 655)
Fatal Accidents
As soon as practicable following an accident involving the loss of a human life, drug and
alcohol tests will be conducted on each surviving covered employee operating the public
transportation vehicle at the time of the accident. In addition, any other covered employee
whose performance could have contributed to the accident, as determined by Franklin
Transit Authority using the best information available at the time of the decision, will be
tested.
Non-fatal Accidents
As soon as practicable following an accident not involving the loss of a human life, drug and
alcohol tests will be conducted on each covered employee operating the public
transportation vehicle at the time of the accident if at least one of the following conditions
is met:
(1) The accident results in injuries requiring immediate medical treatment away from the
scene, unless the covered employee can be completely discounted as a contributing factor
to the accident
Page 117 of 126
(2) One or more vehicles incurs disabling damage and must be towed away from the scene,
unless the covered employee can be completely discounted as a contributing factor to the
accident
In addition, any other covered employee whose performance could have contributed to the
accident, as determined by Franklin Transit Authority using the best information available
at the time of the decision, will be tested.
A covered employee subject to post-accident testing must remain readily available, or it is
considered a refusal to test. Nothing in this section shall be construed to require the delay
of necessary medical attention for the injured following an accident or to prohibit a
covered employee from leaving the scene of an accident for the period necessary to obtain
assistance in responding to the accident or to obtain necessary emergency medical care.
Franklin Transit Authority-Mandated Testing (Non-DOT)
All Other Accidents
In addition to FTA-mandated testing, Franklin Transit Authority requires drug and
alcohol testing for any and all accidents involving Franklin Transit vehicles operated
by covered employees, regardless of property damage amount, injury severity,
citation issuance, or vehicle operability.
Testing under this Authority-mandated provision must be conducted immediately
(within two hours of the accident) and includes both drug and alcohol testing under
non FTA and DOT forms and requirements.
Exception - No-Fault Determination
Testing under Franklin Transit Authority-mandated provisions is NOT required if
there is a specific written determination of no-fault by the supervisor of the operator
of the vehicle.
No-fault determination criteria:
1. Employee is clearly not at fault for the accident
2. Employee's performance did not contribute to the accident in any way
3. Examples include:
- Stopped in traffic and rear-ended
- Mechanical malfunction beyond employee's control
- Act of nature (fallen tree, debris, weather event)
- Third-party action completely outside employee's control
No-fault determination process:
1. Supervisor conducts immediate investigation at scene or immediately after
notification
2. Supervisor documents findings in writing using the Post-Accident No-Fault
Page 118 of 126
Determination Form (Attachment B)
3. Supervisor signs and dates written determination
4. Written determination submitted to Transit Director within two (2) hours of
accident
5. Transit Director reviews and approves or overrides determination within four (4)
hours
6. If no-fault determination is approved, employee is NOT required to test under
Authority-mandated provisions (but may still be subject to FTA-mandated testing if
applicable)
7. If no-fault determination is denied or not made, employee MUST test immediately
8. Employee shall be notified in writing of the determination
Police must be called to the scene of any and all accidents for a police report to be
drafted.
Immediate notification required to:
- Transit Director for Franklin Transit Authority
- City of Franklin Multimodal Coordinator
- City of Franklin Risk Manager
Random Testing
Random drug and alcohol tests are unannounced and unpredictable, and the dates for
administering random tests are spread reasonably throughout the calendar year. Random
testing will be conducted at all times of the day when safety-sensitive functions are
performed.
Testing rates will meet or exceed the minimum annual percentage rate set each year by the
FTA administrator. The current year testing rates can be viewed online at
www.transportation.gov/odapc/random-testing-rates.
The selection of employees for random drug and alcohol testing will be made by a
scientifically valid method, such as a random number table or a computer-based random
number generator. Under the selection process used, each covered employee will have an
equal chance of being tested each time selections are made.
A covered employee may only be randomly tested for alcohol misuse while the employee is
performing safety-sensitive functions, just before the employee is to perform safety-
sensitive functions, or just after the employee has ceased performing such functions. A
covered employee may be randomly tested for prohibited drug use anytime while on duty.
Each covered employee who is notified of selection for random drug or random alcohol
testing must immediately proceed to the designated testing site.
Page 119 of 126
6. Testing Procedures
All FTA drug and alcohol testing will be conducted in accordance with 49 CFR Part 40, as
amended.
Dilute Urine Specimen
If there is a negative dilute test result, Franklin Transit Authority will conduct one
additional retest. The result of the second test will be the test of record.
Dilute negative results with a creatinine level greater than or equal to 2 mg/dL but less
than or equal to 5 mg/dL require an immediate recollection under direct observation (see
49 CFR Part 40, section 40.67).
Split Specimen Test
In the event of a verified positive test result, or a verified adulterated or substituted result,
the employee can request that the split specimen be tested at a second laboratory. Franklin
Transit Authority guarantees that the split specimen test will be conducted in a timely
fashion. Franklin Transit Authority will pay for the split specimen test for the
employee.
7. Test Refusals
As a covered employee, you have refused to test if you:
(1) Fail to appear for any test (except a pre-employment test) within a reasonable time, as
determined by Franklin Transit Authority.
(2) Fail to remain at the testing site until the testing process is complete. An employee who
leaves the testing site before the testing process commences for a pre-employment test has
not refused to test.
(3) Fail to provide a specimen for a drug or alcohol test. An employee who does not provide
a specimen because he or she has left the testing site before the testing process commenced
for a pre-employment test has not refused to test.
(4) In the case of a directly-observed or monitored urine drug collection, fail to permit
monitoring or observation of your provision of a specimen.
(5) Fail to provide a sufficient specimen for a drug or alcohol test without a valid medical
explanation.
(6) Fail or decline to take a second drug test as directed by the collector or Franklin Transit
Authority.
(7) Fail to undergo a medical evaluation as required by the MRO or Franklin Transit
Authority's Designated Employer Representative (DER).
Page 120 of 126
(8) Fail to cooperate with any part of the testing process.
(9) Fail to follow an observer's instructions to raise and lower clothing and turn around
during a directly-observed urine drug test.
(10) Possess or wear a prosthetic or other device used to tamper with the collection
process.
(11) Admit to the adulteration or substitution of a specimen to the collector or MRO.
(12) Refuse to sign the certification at Step 2 of the Alcohol Testing Form (ATF).
(13) Fail to remain readily available following an accident.
As a covered employee, if the MRO reports that you have a verified adulterated or
substituted test result, you have refused to take a drug test.
As a covered employee, if you refuse to take a drug and/or alcohol test, you incur the same
consequences as testing positive and will be immediately removed from performing safety-
sensitive functions, and provided with contact information for SAPs.
8. Voluntary Self-Referral
Any employee who has a drug and/or alcohol abuse problem and has not been notified of
the requirement to submit to reasonable suspicion, random or post-accident testing or has
not refused a drug or alcohol test may voluntarily refer her or himself to the Transit
Director for Franklin Transit Authority, who will refer the individual to a substance abuse
counselor for evaluation and treatment.
The substance abuse counselor will evaluate the employee and make a specific
recommendation regarding the appropriate treatment. Employees are encouraged to
voluntarily seek professional substance abuse assistance before any substance use or
dependence affects job performance.
Any safety-sensitive employee who admits to a drug and/or alcohol problem will
immediately be removed from his/her safety-sensitive function and will not be allowed to
perform such function until successful completion of a prescribed rehabilitation program.
9. Prescription Drug Use
The appropriate use of legally prescribed drugs and non-prescription medications is not
prohibited. However, the use of any substance which carries a warning label that indicates
that mental functioning, motor skills, or judgment may be adversely affected must be
reported to the Transit Director for Franklin Transit Authority. Medical advice should be
sought, as appropriate, while taking such medication and before performing safety-
sensitive duties.
Page 121 of 126
10. Contact Person
For questions about Franklin Transit Authority's anti-drug and alcohol misuse program,
contact the Transit Director for Franklin Transit Authority, Mike Johnston.
Attachment A: Covered Positions
Franklin Transit Authority Safety-Sensitive Positions
Safety Sensitive Employees Subject to Testing:
Operators
- Fixed-route Bus Operators
- Shuttle Bus Operators
- Demand Response Operators
- Micro-Transit Vehicle Operators
Supervision
- Dispatchers
- Transit Supervisors
Page 122 of 126
Attachment B: Post-Accident No-Fault Determination Form
FRANKLIN TRANSIT AUTHORITY
POST-ACCIDENT NO-FAULT DETERMINATION FORM
Date of Accident: ____ Time: _____
Location: _________
Vehicle Involved: Unit # _ VIN: ______
Employee/Operator: ______
Supervisor Making Determination: ____
ACCIDENT DESCRIPTION:
EVIDENCE REVIEWED:
☐ Scene photographs
☐ Police report
☐ Witness statements (# of witnesses: _)
☐ Vehicle damage assessment
☐ Surveillance/camera footage
☐ Employee statement
☐ Other: __
NO-FAULT CRITERIA ASSESSMENT:
☐ Employee was completely not at fault (check one or more):
- ☐ Stopped in traffic and rear-ended
- ☐ Mechanical malfunction beyond employee's control
- ☐ Act of nature (specify): __
- ☐ Third-party action outside employee's control (specify): __
- ☐ Other (explain): _____
☐ Employee's performance did NOT contribute to accident in any way
☐ Employee followed all Franklin Transit policies and procedures
Page 123 of 126
☐ No evidence of impairment, distraction, or negligence
DETERMINATION:
☐ NO-FAULT DETERMINATION APPROVED - Drug and alcohol testing NOT required
under Authority-mandated provisions
☐ NO-FAULT DETERMINATION DENIED - Drug and alcohol testing REQUIRED
immediately
Justification for Determination:
Supervisor Signature: ____ Date/Time: ____
TRANSIT DIRECTOR REVIEW:
☐ APPROVED - No-fault determination upheld
☐ DENIED/OVERRIDDEN - Testing required
Transit Director Signature: __ Date/Time: _
EMPLOYEE NOTIFICATION:
Employee notified of determination on ___ at _ (date/time)
Employee signature acknowledging notification: ___
COPY DISTRIBUTION:
- Original: Employee personnel file
- Copy: Transit Director
- Copy: City of Franklin Multimodal Coordinator
- Copy: City of Franklin Risk Manager
- Copy: The TMA Group (if applicable)
Page 124 of 126
The Transportation Management Association Group
AUTHORITY ACTION ITEM
Item Number: BAI 8-4-26E Meeting Date: 08-04-26
Item Title: Consideration of Updated Drug and Alcohol Testing Policy for Franklin Transit
Authority
BACKGROUND
To be in compliance with the terms of Amendment No. 2 of the Franklin Transit Authority Vehicle
Lease Agreement, COF Contract No. 2023-0233, the current Franklin Transit Authority Drug and
Alcohol Policy require various revisions.
Required revisions are noted in bold in the updated document.
STAFF RECOMMENDATION
TMA staff recommend, to ensure compliance with Amendment No. 2 of the Franklin Transit
Authority Vehicle Lese Agreement, COF Contract No. 2023-0233, the Franklin Transit
Authority approve the updated Franklin Transit Authority Drug and Alcohol Policy.
Approved _____________________________ _____________________
Authority Officer Date
ITEM BAI 8-4-26E
Page 125 of 126
The Transportation Management Association Group
BOARD ACTION ITEM
Item Number: BAI 8-4-26F Meeting Date: 08-04-26
Item Title: Acknowledgement of Procurement and Purchasing of Transit Vehicles
BACKGROUND
Federal Transit Administration 5307 grant allocations for rolling stock have been
awarded to Franklin Transit Authority. These grant funds allow for the purchase
of transit vehicles.
Three new cutaway replacement vehicles have been procured. This procurement
is in line with the Franklin Transit Asset Management Plan and reflects the
Federal Transit Administration’s emphasis on maintaining vehicles fleets in a
state of good repair. The vehicles being replaced according to Federal Transit
Administration rules joined the fleet pre-pandemic and have exceeded the useful
life standard of five years.
The new vehicles are expected to have a positive impact by reducing repair costs
associated with maintaining older equipment. Including recurring high-cost
repairs such as repetitive engine replacements.
The vehicles are new, and the same style as those purchased in 2025/2026:
Chevrolet 4500 Classic StarCraft All Stars with a full manufacturer warranty.
STAFF RECOMMENDATION
TMA staff recommend the Franklin Transit Authority acknowledge the
Procurement and Purchasing of the transit vehicles.
Approved _____________________________ _____________________
Board Officer Date
ITEM BAI 8-4-26F
Page 126 of 126
Source: Williamson County website. First collected Oct 27, 2026.